  1. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  2. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  3. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  4. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  5. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  6. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  7. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC.

  8. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC

  9. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. Th...

  10. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  11. 7 CFR 275.16 - Corrective action planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...

  12. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  13. American Samoa Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  14. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  15. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  16. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  17. St. Lawrence action plan meter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    The purpose of this bulletin is to report on the progress achieved under the St. Lawrence Action Plan. Under each of the Action Plan`s five objectives, it outlines environmental management indicators which identify actions taken and shows the results. This report presents the data collected in late August 1992 on the activities carried out by all partners of both governments involved in SLAP. The objectives examined in the bulletin are: to reduce by 90% the liquid toxic waste discharged by the 50 plants targeted for priority action; to prepare remediation plans for contaminated federal sites and restore wetlands; to conserve 5000 additional hectares of habitat and create a marine park; to develop and implement recovery plans for mammals, fish, birds, amphibians, reptiles, and plants; and to determine the state of the St. Lawrence River.

  18. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  19. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  20. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  1. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  2. Turning strategy into action: implementing a conservation action plan in the Cape Floristic Region

    CSIR Research Space (South Africa)

    Gelderblom, CM

    2003-07-01

    Full Text Available for conservation. These pressures are predicted to intensify, as the region acts as a magnet for settlement and development. This paper thus describes the development of a conservation action plan for the region, arising from the Cape Action Plan...

  3. Delivery 7 Report on the impact of conflicts/synergies and policy proposals for implementing the EU Action Plan in member states

    DEFF Research Database (Denmark)

    Beck, Anne-Marie Tyroll; Michelsen, Johannes

    This report on “Implementing the European Organic Action Plan in EU member states - stakeholders’ perceptions of implementation problems and coping strategies” recapitulates the results of a series of national workshops undertaken in winter/spring 2007. It brings together very different views...... and perceptions on organic action plans and possible evaluation methodologies and can be seen as ORGAP’s stakeholder oriented or public oriented step....

  4. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  5. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    Directory of Open Access Journals (Sweden)

    Sanjeev Sridharan

    2016-09-01

    Full Text Available Background: Mainstreaming of gender, equity, and human rights (GER is an important focus of the World Health Organization (WHO and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design: A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results: GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions: Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  6. Solar heating action plan; Solvarme handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Jan Erik

    2011-10-15

    This solar action plan should be seen as a follow-up to the Danish Energy Agency's solar heating strategy from 2007, which showed great potential and opportunities for exploitation and use of solar heat in Denmark. In relation to the strategy from 2007, this action plan adjusted the distribution of solar heat from district heating plants and individual plants, but it is still the objective of this action plan to achieve the strategy's overall goal for 2030. With the implementation of the Action Plan in early 2012, it is estimated that in 2030 there will be about. 10 million m2 of solar collectors in operation, 8 million m2 for district heating and 2 million m2 for individual heating, equivalent to an installed capacity totaling 7 GW. The budget for actions in the Action Plan is about 80 million DKK annually over the next 5 years to initiate and ensure this development. (LN)

  7. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  8. Rehabilitation in Madagascar: Challenges in implementing the World Health Organization Disability Action Plan.

    Science.gov (United States)

    Khan, Fary; Amatya, Bhasker; Mannan, Hasheem; Burkle, Frederick M; Galea, Mary P

    2015-09-01

    To provide an update on rehabilitation in Madagascar by using local knowledge to outline the potential barriers and facilitators for implementation of the World Health Organization (WHO) Disability Action Plan (DAP). A 14-day extensive workshop programme (September-October 2014) was held at the University Hospital Antananarivo and Antsirabe, with the Department of Health Madagascar, by rehabilitation staff from Royal Melbourne Hospital, Australia. Attendees were rehabilitation professionals (n=29) from 3 main rehabilitation facilities in Madagascar, who identified various challenges faced in service provision, education and attitudes/approaches to people with disabilities. Their responses and suggested barriers/facilitators were recorded following consensus agreement, using objectives listed in the DAP. The barriers and facilitators outlined by participants in implementing the DAP objectives include: engagement of health professionals and institutions using a multi-sectoral approach, new partnerships, strategic collaboration, provision of technical assistance, future policy directions, and research and development. Other challenges for many basic policies included: access to rehabilitation services, geographical coverage, shortage of skilled work-force, limited info-technology systems; lack of care-models and facility/staff accreditation standards; limited health services infrastructure and "disconnect" between acute and community-based rehabilitation. The DAP summary actions were useful planning tools to improve access, strengthen rehabilitation services and community-based rehabilitation, and collate data for outcome research.

  9. American Samoa: Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ness, J. Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Conrad, Misty [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  10. 29 CFR 1918.100 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans. (a) Scope and application. This section requires all employers to develop and implement an... departments that can be contacted for further information or explanation of duties under the plan. (c) Alarm... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work...

  11. Mitigation Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  12. Clean Water Act (CWA) Action Plan Implementation Priorities: Changes to Improve Water Quality, Increase Compliance and Expand Transparency

    Science.gov (United States)

    The Clean Water Act (CWA) Action Plan Implementation Priorities describes the new approaches to revamp the National Pollutant Discharge Elimination System (NPDES) permitting, compliance and enforcement program.Issued May 11, 2011

  13. Texas strategic action plan for motorcycles : 2013-2018.

    Science.gov (United States)

    2013-06-01

    The Texas Strategic Action Plan for Motorcycles: 2013-2018 provides an integrated : approach to identify implementable strategies and action steps to make the : road environment and infrastructure safer for motorcyclists and other powered : two- and ...

  14. HERCA Action Plan in relation to the transposition and implementation of Directive 2013/59/Euratom (Euratom BSS)

    International Nuclear Information System (INIS)

    Fremout, An; Vanderlinck, Annie; Berlamont, Jolien; Van Bladel, Lodewijk; Petrova, Karla; Ulbak, Kaare; Mundigl, Stefan; ); Markkanen, Mika; Godet, Jean-Luc; Tran-Thien, Vivien; Koch, Isabell Christin; Hackstein, Matthias; Griebel, Juergen; Kamenopoulou, Vasiliki; Fennel, Stephan; Ryan, Tom; Schreiner, Alexandra; Majerus, Patrick; Vermeulen, Ton; Holo, Eldri; Wiklund, Asa; RYF, Salome; Thomas, Gareth; Wellens, Rob; Ebdon-Jackson, Steve

    2014-10-01

    On 5 December 2013, the Council of the European Union adopted Council Directive 2013/59/Euratom laying down basic safety standards for protection against the dangers arising from exposure to ionising radiation.1 Member States have to transpose the new Basic Safety Standards Directive (BSS Directive) into their national legal systems by 6 February 2018 at the latest. At the 13. meeting of the Board of HERCA (BoH) in Vilnius in June 2014, a proposal to establish a special Task Force (TF) to make proposals in relation to HERCA activities in support of the transposition and implementation of the new Euratom BSS Directive was agreed. The BSS-TF was established, commenced its work on the basis of a 'non-questionnaire' and a discussion document. It met on one occasion on 7 October 2014 and agreed an action plan for consideration by the BoH. The agreed action plan proposal was approved by the BoH on the occasion of its 14. meeting in Stockholm, on 21-22 October 2014. The approved Action Plan covers the following areas: - Identification of HERCA's role in the transposition of the new Euratom BSS; - Definition of actions for HERCA in relation to the transposition of the BSS; - Coordination between HERCA and the EC in relation to BSS transposition activities. The Actions identified relate to several subject areas: Emergency preparedness and response; Medical exposures; Radon; Non-medical imaging exposures; RPE/RPO; General exchange of information. HERCA is a voluntary association, in which the Heads of European Radiological Protection Competent Authorities work together in order to identify common issues and propose practical solutions for these issues. It has no statutory role in relation to the transposition of the Euratom BSS. However, additional work by HERCA can support the transposition process as indicated in the Action Plan. Uniform transposition or implementation in the Member States is not an objective of HERCA activities. Clearly it will remain a matter for

  15. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  16. Action plan in response to March 1981 report to NFPQT Committee

    International Nuclear Information System (INIS)

    1981-03-01

    This plan of action has been prepared at the direction of the Acting Under Secretary in response to the report of the Nuclear Facilities Personnel Qualifications and Training (NFPQT) Committee on A Safety Assessment of Department of Energy Nuclear Reactors. Senior Department officials with Headquarters responsibilities for the safety of nuclear facilities owned by and operated for the Department have developed this plan with input from the operations office managers having operational responsibility for such facilities. A summary of the plan's objectives and a cross-reference to the findings of the NFPQT Committee Report is attached to the plan. Appendix A contains implementing actions and Appendix B contains a summary of actions responsive to lessons learned from the TMI accident that have been completed or are well underway. Although the plan is written in definitive language, the specific actions (such as organization realignments and proposals) will be subject to appropriate review and approval. Also, other adjustments may be required as the actions are implemented

  17. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found......Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature...

  18. Implementing of action plans for risk communication on the uranium mining sites remedy at Ningyo-Toge Environmental Engineering Center

    International Nuclear Information System (INIS)

    Yabuta, Naohiro; Kawai, Jun; Hikawa, Tamae

    2005-02-01

    On the closure of uranium production facilities, settled at Ningyo-Toge Environmental Engineering Center and other area in Okayama and Tottori prefectures, action plans for risk communication with residence and local governments were developed and implemented. With the direction of the action plans for risk communication, 'Imaging plan for developing the local area around Ningyo-Toge' were drawn. Furthermore, practical program called Ethnography by High School Students' were developed, which draw the outlines of past and future around Ningyo-Toge with the insights of high school students, and conducted. As the fundamental materials required to conduct the program above, the topography of northern part of Okayama prefecture, the history and cultures of Kamisaibara village, the history of the uranium mining sites at Ningyo-Toge and Japanese nuclear energy development were clarified. Furthermore, Emergency management plans during pursuing of risk communication plans were also developed. (author)

  19. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  20. Action plan for Nordic energy co-operation 2006-2009

    International Nuclear Information System (INIS)

    2005-01-01

    The Action Plan for Nordic Energy Co-operation 2006-2009 is targeted at creating a visible and sustainable contribution to solving the most important and politically most relevant energy policy challenges faced by the Nordic region. The plan concentrates on three main areas: Energy markets; Sustainable energy system; and Nordic impact on the international agenda. The Action Plan is the energy sector's contribution to the implementation of the Nordic strategy 'Sustainable Development - New Bearing for the Nordic Countries' and to a number of the Nordic Council's recommendations for the development of the Nordic energy sector. An important element of the implementation of the action plan is on-going contact and information sharing between the Nordic Energy Policy co-operation and the Nordic Energy Research. The continues dialogue between the Nordic Council of Energy Ministers and The Nordic Council on future energy policy challenges will likewise be an important part of the political process. (BA)

  1. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.

    Science.gov (United States)

    Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous

  2. The Ontario Osteoporosis Strategy: implementation of a population-based osteoporosis action plan in Canada.

    Science.gov (United States)

    Jaglal, S B; Hawker, G; Cameron, C; Canavan, J; Beaton, D; Bogoch, E; Jain, R; Papaioannou, A

    2010-06-01

    In the last decade, there have been a number of action plans published to highlight the importance of preventing osteoporosis and related fractures. In the province of Ontario Canada, the Ministry of Health provided funding for the Ontario Osteoporosis Strategy. The goal is to reduce morbidity, mortality, and costs from osteoporosis and related fractures through an integrated and comprehensive approach aimed at health promotion and disease management. This paper describes the components of the Ontario Osteoporosis Strategy and progress on implementation efforts as of March 2009. There are five main components: health promotion; bone mineral density testing, access, and quality; postfracture care; professional education; and research and evaluation. Responsibility for implementation of the initiatives within the components is shared across a number of professional and patient organizations and academic teaching hospitals with osteoporosis researchers. The lessons learned from each phase of the development, implementation, and evaluation of the Ontario Osteoporosis Strategy provides a tremendous opportunity to inform other jurisdictions embarking on implementing similar large-scale bone health initiatives.

  3. Putting Action Back into Action Planning: Experiences of Career Clients

    Science.gov (United States)

    Borgen, William A.; Maglio, Asa-Sophia T.

    2007-01-01

    This study used the critical incident technique to investigate what helped and hindered unemployed and career-changing people in implementing the action plans they developed while participating in career or employment counseling. Information from interviews with 23 women and 16 men generated 9 categories of helping incidents and 9 categories of…

  4. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  5. Protecting drinkable water: an analysis of action plans and stakeholders' networks

    Science.gov (United States)

    Gascuel-Odoux, Chantal; Menard, Marjorie

    2015-04-01

    Since WFD the policy for protecting drinkable water has been enhanced in France. This policy establish the main components and the different steps for protecting drinkable water, and ask for defining and implementing an action plan for each contributing catchment. Despite ambitious objectives, the local implementation is difficult. Firstly there is a high diversity of stakeholders involved with local authorities, which are mainly: water agencies, agricultural chambers and consultants, authorities at regional and departmental levels. Most of the local authorities do not feel qualified enough for carrying out such a policy, as they are not really used to deal with technical and political issues related to agricultural diffuse pollutions. As a consequence assessed action plans are based on regulation and/or agri-environmental measures. More ambitious and complementary measures can be included, but without any support measure nor accurate objectives for their implementation. In the end, action plans reflect more a formal implementation of protection approaches than a search for efficiency by defining ambitious measures and the setting-up a consistent support scheme. The way stakeholders' networks mobilize knowledge have been analyzed based on ten case studies located in three different regions. Three local authorities profiles are defined: (1) the "passive" ones, not really convinced of the necessity to undertake actions against diffuse pollutions and/or having low level of knowledge to support local reflexion, that delegate project management; (2) the local authorities that support local protection approach but that, for different reasons, do not search for an effective action plan, and that only consider an improvement approach; (3) the local authorities that more rarely, aim at efficient actions, motivated by the urgent need of action for preserving threatened resources. According to these profiles, local authorities and their project coordinators will be looking

  6. 36 CFR 72.13 - Action plan.

    Science.gov (United States)

    2010-07-01

    ... objectives, priorities and implementation strategies in relation to the intent of the Urban Park and... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK...

  7. What's an Asthma Action Plan?

    Science.gov (United States)

    ... Educators Search English Español What's an Asthma Action Plan? KidsHealth / For Parents / What's an Asthma Action Plan? ... acción contra el asma? What's an Asthma Action Plan? An asthma action plan (or management plan) is ...

  8. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  9. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  10. Energy efficiency action plan. Policy action plan for promotion of energy efficiency in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply and environmental protection. Therefore, the Czech government aims to promote these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. In addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formulation of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Energy Efficiency Action Plan focuses on promotion of energy efficiency in end-use (this report); The Renewable Energy Action Plan (separate report; ECN-C--99-064) deals with policy on promotion of renewable energy production. These two Action Plans provide policy makers in the Czech government with essential information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; and (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the investment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  11. Renewable energy action plan. Policy action plan for promotion of renewable energy in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply; and environmental protection. Therefore, the Czech government promotes these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. However, in addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formula tion of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Renewable Energy Action Plan (this report) addresses renewable energy production. The Energy Efficiency Action Plan focuses on the promotion of energy efficiency in end use (separate report; ECN-C--99-065). These two Action Plans provide policy makers in the Czech government with information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the invest ment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  12. Evaluation criteria for communications-related corrective action plans

    International Nuclear Information System (INIS)

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations

  13. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found...

  14. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  15. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  16. The technical approach: The IAEA action plan on the safety of radiation sources

    International Nuclear Information System (INIS)

    Bilbao, A.; Wrixon, A.; Ortiz-Lopez, P.

    2001-01-01

    As part of the measures to strengthen international co-operation in nuclear, radiation and waste safety, the report refers to the implementation of the Action Plan for the Safety of Radiation Sources and the Security of Radioactive Materials. Starting with background information, the report references the main results of the Dijon Conference and of General Conference resolution GC(42)/RES/12 in September 1998, describing the actions taken by the Secretariat pursuant such resolution and also by the Board of Governors, in its sessions of March and September 1999, as well as by the General Conference, in October 1999 when by resolution GC(43)/RES/10 the Action Plan was endorsed and the Secretariat was urged to implement it. Finally, the report provides information on the status of implementation of the seven areas covered by the Action Plan and on the suggested further actions to be carried out for its implementation taking into account the decisions of the Board in its meeting of 11 September 2000 and the resolutions GC(44)/RES/11, GC(44)/RES/13 and GC(44)/RES/16 of the forty-fourth regular session of the General Conference. (author)

  17. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  18. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  19. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  20. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...

  1. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  2. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  3. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  4. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    Science.gov (United States)

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  5. A national action plan for workforce development in behavioral health.

    Science.gov (United States)

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  6. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  7. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  8. Ontario's energy action plan

    International Nuclear Information System (INIS)

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  9. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  10. Implementation of an action plan in radiological protection of the patient in Argentina

    International Nuclear Information System (INIS)

    Michelin, S.; Perez, M.R.; Dubner, D.

    2006-01-01

    consider the inclusion of topics of PRP in the medical grade formation. Work groups were constituted in Radiodiagnostic, Radiotherapy, Nuclear Medicine and the PRP of the pregnant woman that agreed the contents and chronograph of a work plan to short and medium term that is at the moment in execution. The continuity of this coordinated action facilitated the execution of the proposed objectives. In this communication the results obtained until the present of the action plan for the PRP implemented in the Argentina starting from the year 2004 are presented. (Author)

  11. Preservation of information about the repository for spent nuclear fuels - proposal for action plan

    International Nuclear Information System (INIS)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina

    2008-10-01

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States)

    2017-08-01

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigation (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.

  13. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident; Fortgeschriebener Aktionsplan zur Umsetzung von Massnahmen nach dem Reaktorunfall in Fukushima

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-01-15

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  14. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Science.gov (United States)

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  15. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  16. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  17. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  18. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  19. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  20. Developing Asset Life Cycle Management capabilities through the implementation of Asset Life Cycle Plans – an Action Research project

    OpenAIRE

    Ruitenburg, Richard; Braaksma, Anne Johannes Jan

    2017-01-01

    Asset Life Cycle Management is a strategic approach to managing physical assets over their complete life cycle. However, the literature and the recent ISO 55,000 standard do not offer guidance as to how to develop such an approach. This paper investigates the main capabilities for Asset Life Cycle Management by means of a four year Action Research project implementing Asset Life Cycle Plans. Five main capabilities emerged: 1. strategic information use; 2. alignment of operations and strategy;...

  1. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  2. Flood action plans

    International Nuclear Information System (INIS)

    Slopek, R.J.

    1995-01-01

    Safe operating procedures developed by TransAlta Utilities for dealing with flooding, resulting from upstream dam failures or extreme rainfalls, were presented. Several operating curves developed by Monenco AGRA were described, among them the No Overtopping Curve (NOC), the Safe Filling Curve (SFC), the No Spill Curve (NSC) and the Guaranteed Fill Curve (GFC). The concept of an operational comfort zone was developed and defined. A flood action plan for all operating staff was created as a guide in case of a flooding incident. Staging of a flood action plan workshop was described. Dam break scenarios pertinent to the Bow River were developed for subsequent incorporation into a Flood Action Plan Manual. Evaluation of the technical presentations made during workshops were found them to have been effective in providing operating staff with a better understanding of the procedures that they would perform in an emergency. 8 figs

  3. Motivations for self-regulation: The clean air action plan

    International Nuclear Information System (INIS)

    Giuliano, Genevieve; Linder, Alison

    2013-01-01

    In the fall of 2006 the Ports of Long Beach and Los Angeles announced the Clean Air Action Plan (CAAP). Its intent was to greatly accelerate emissions reductions from port activities. The CAAP was unprecedented in several ways: it was a voluntary agreement between two competing ports; it was achieved with the cooperation of local, state and federal agencies; it promised large particulate emissions reductions along with continued port growth, and it had a price tag of $2.1 billion. What explains the Ports’ decision to implement the CAAP? We conduct a case study to explore alternative explanations for the CAAP. Using data from interviews, media, and the history of events leading up to the CAAP, we find that the CAAP was a strategic response to social and political pressures that had built up over the previous decade. Its intent was to respond to local concerns and reduce opposition to port growth. The CAAP represents an example of the potential of voluntary efforts to solve environmental problems. - Highlights: • We conduct a case study of self-regulation for emissions reduction at seaports in Southern California. • We examine motivations for implementing the Clean Air Action Plan. • We find that social and political pressures were the main motivators, with regulatory threats a contributing factor. • The Clean Air Action Plan is a powerful example of the potential of voluntary strategies

  4. Action plan against declining vineyards: An innovative approach

    Directory of Open Access Journals (Sweden)

    Riou Christophe

    2016-01-01

    Full Text Available Declining vineyards are assessed by a multi-year decrease in vine productivity and/or its sudden premature or gradual death, based on multiple factors. Since 2015, the French wine sector has been working on an original study to identify new research avenues while launching an innovative action plan to combat vineyard decline. First, a statistical analysis enabled to estimate research efforts in the different countries. 70 factors susceptible to contribute to vineyard decline were then identified by analyzing more than 500 publications. These factors are biological, physical or linked to growing practices. While the role of pathogens is fairly well-known, the impact of the land plot or the soil on decline is less understood. Secondly, a prospective methodology was used to better identify viticulture system factors and levers affecting vines. It was thus demonstrated that yield and longevity are strongly linked to agronomy, economic variables and plant matter, plant physiology, disease, etc... These are the key issues and leverage actions to combat more strongly vineyard decline. The matrix analysis was then complemented by interviews and statistical data to imagine leverage actions. The strategic action plan is focused on four objectives: promoting training of good practices, improving plant production organization, developing vineyard observation networks, implementing an innovative research plan.

  5. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  6. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  7. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  8. 75 FR 20922 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Science.gov (United States)

    2010-04-22

    ... with the January 2009, ``Guidance for Developing Transportation Conformity State Implementation Plans... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... Transportation Conformity? II. What Is the Background for This Action? III. What Did the State Submit and How Did...

  9. 77 FR 45326 - Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional...

    Science.gov (United States)

    2012-07-31

    ... available in either location (e.g., Confidential Business Information). To inspect the hard copy materials..., Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; notice of additional...

  10. Preparing US community greenhouse gas inventories for climate action plans

    International Nuclear Information System (INIS)

    Blackhurst, Michael; Scott Matthews, H; Hendrickson, Chris T; Sharrard, Aurora L; Azevedo, Ines Lima

    2011-01-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  11. Preparing US community greenhouse gas inventories for climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Blackhurst, Michael [Department of Civil, Architectural and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0276 (United States); Scott Matthews, H; Hendrickson, Chris T [Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Sharrard, Aurora L [Green Building Alliance, 333 East Carson Street, Suite 331, Pittsburgh, PA 15219 (United States); Azevedo, Ines Lima, E-mail: mblackhurst@gmail.com, E-mail: hsm@cmu.edu, E-mail: auroras@gbapgh.org, E-mail: cth@andrew.cmu.edu, E-mail: iazevedo@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States)

    2011-07-15

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  12. Building Energy Benchmarking in India: an Action Plan for Advancing the State-of-the-Art

    Energy Technology Data Exchange (ETDEWEB)

    Sarraf, Saket [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Anand, Shilpi [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Shukla, Yash [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Singh, Reshma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-06-01

    This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .

  13. 76 FR 49313 - Approval and Promulgation of Implementation Plans North Carolina: Prevention of Significant...

    Science.gov (United States)

    2011-08-10

    ... Code (NCAC), Subchapter 2D .0530, subsections (a), (b), (g), (i), (u), and (v) (from North Carolina's... and Promulgation of Implementation Plans North Carolina: Prevention of Significant Deterioration and...: EPA is taking final action to approve revisions to the North Carolina State Implementation Plan (SIP...

  14. 'Action 2016': AREVA's strategic action plan

    International Nuclear Information System (INIS)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  15. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  16. ECOWindS Joint Action Plan

    DEFF Research Database (Denmark)

    2014-01-01

    The Joint Action Plan (JAP) is a deliverable of the ECOWindS project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. The objective of the JAP is to be an international...

  17. Development and verification for review plan of emergency action level (EAL)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Emergency action levels (EALs) are used as the trigger in order to implement the precautionary protective actions at the nuclear emergency. In this study the framework for applying the EAL in Japan and the process for developing the review plan, such as procedures to review the basis of EAL submitted by the licensee, have been investigated based on the survey for EAL review executed in the United States. In addition, issues to reflect the EAL framework in enhancement of the local government emergency planning and emergency response support system have been investigated. (author)

  18. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  19. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  20. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  1. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  2. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency submitted the SIP... request would revise SIP requirements applicable to Saint Mary's Hospital, located in Rochester, Minnesota...

  3. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  4. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  5. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  6. Climate Action Planning Tool | NREL

    Science.gov (United States)

    NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to Tool Calculation Formulas and Assumptions Climate Neutral Research Campuses Website Climate Neutral

  7. Implementation intention and action planning interventions in health contexts: state of the research and proposals for the way forward.

    Science.gov (United States)

    Hagger, Martin S; Luszczynska, Aleksandra

    2014-03-01

    The purpose of this paper is to provide an overview of the literature on two planning intervention techniques in health behaviour research, implementation intentions and action planning, and to develop evidence-based recommendations for effective future interventions and highlight priority areas for future research. We focused our review on four key areas: (1) definition and conceptualisation; (2) format and measurement; (3) mechanisms and processes; and (4) design issues. Overall, evidence supports the effectiveness of planning interventions in health behaviour with advantages including low cost and response burden. There is, however, considerable heterogeneity in the effects across studies and relatively few registered randomised trials that include objective behavioural measures. Optimally effective planning interventions should adopt "if-then" plans, account for salient and relevant cues, include examples of cues, be guided rather than user-defined, and include boosters. Future studies should adopt randomised controlled designs, report study protocols, include fidelity checks and relevant comparison groups, and adopt long-term behavioural follow-up measures. Priority areas for future research include the identification of the moderators and mediators of planning intervention effects. Future research also needs to adopt "best practice" components of planning interventions more consistently to elucidate the mechanisms and processes involved. © 2013 The International Association of Applied Psychology.

  8. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  9. Action plan for renewable energy sources

    International Nuclear Information System (INIS)

    2000-03-01

    energy sources in relation to other energy sources. The objective in the long term is to make them as competitive as possible in the open energy market. Among those measures of crucial importance included in the Action Plan, we can mention development and commercialisation of new technology as well as several financial measures, of which taxation and investment aid are considered to have the greatest effect. In addition, the Action Plan presents several administrative measures for the promotion of renewable energy sources. A separate assessment of the environmental impact of the Action Plan has been made resulting in an environmental impact statement (EIS) that contains a detailed account of the environmental impacts of the use of renewable energy sources and the use of peat in energy production. The most important environmental impact of the implementation of the Action Plan will be a reduction in greenhouse gas emissions. As a result of the intensified measures to be taken in accordance with the Action Plan, carbon dioxide emissions are estimated to be reduced at least by 2 million tons per year compared with the outlook presented in the Energy Strategy. Further, the use of waste, which otherwise would have been transported to tips, in energy production is estimated to reduce methane emissions by 1 million ton per year (C0 2 equivalent). The reduction might be even much bigger in the next few years. To ensure that the objectives of the Action Plan will be achieved, the contribution by the State (tax subsidies, investment aid and other forms of aid) should be approx. FIM 500 million on an average per year in the next ten years. In 1998, the State's contribution exceeded FIM 300 million. Further, financing amounting to approx. FIM 200 million is channelled to the research on and the development of energy production technology, which in the future to a larger extent than now will be channelled to the development of such forms of energy production technology that are using

  10. 77 FR 2514 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Science.gov (United States)

    2012-01-18

    ... Ocean Council developed actions to achieve the Policy's nine priority objectives, and to address some of..., contribute trillions of dollars a year to the national economy, and are essential to public health and... departments, agencies, and offices developed the actions in the draft Implementation Plan with significant...

  11. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  12. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    T. M. Fitzmaurice

    2000-01-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection[NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site

  13. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  14. 77 FR 26441 - Approval and Promulgation of Implementation Plans; North Carolina; Charlotte; Ozone 2002 Base...

    Science.gov (United States)

    2012-05-04

    ... Promulgation of Implementation Plans; North Carolina; Charlotte; Ozone 2002 Base Year Emissions Inventory... final action to approve the ozone 2002 base year emissions inventory portion of the state implementation... Air Act (CAA or Act). EPA will take action on the South Carolina submission for the ozone 2002 base...

  15. 77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program

    Science.gov (United States)

    2012-04-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0213; FRL-9661-6] Revision to the Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would...

  16. National action plan 2016-2019 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Mortureux, Marc; Vallet, Benoit; Struillou, Yves; Girometti, Laurent

    2017-01-01

    After a brief presentation of the context, and a presentation of aspects related to the plan governance and strategies (plan steering, actors in the radon risk management, synthesis of main actions in France, regulatory evolutions and new strategies), this report presents the three axes of the national action plan for 2016-2019. The first one consists in the implementation of a global strategy of information and in developing tools to collect and share information. The second one consists in a continuous knowledge improvement. The third one consists in a better taking into account of radon risk management in buildings. Sheets are then proposed which describe the various actions associated with these axes (5 actions for the first one, 10 for the second, and 5 for the third one). Each sheet comprises the action title, its objectives, methods and tools, its coordinator and actors, its agenda and current status

  17. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  18. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  19. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  20. An action plan for radioactive substances regulation

    International Nuclear Information System (INIS)

    1998-01-01

    This document sets out an action plan for the Agency's Radioactive Substances Regulation function. Our vision is to secure continuous improvement in the protection of the public and the environment from the harmful effects of radioactive substances. Radioactive Substances Regulation will work with others to realise this vision and contribute to the Agency's role in achieving sustainable development. We will also work to ensure that the Agency achieves its objectives in an efficient, consistent and integrated way. The main elements of our Action Plan are as follows: establishing indicators of sustainability and the means and methods of monitoring them; establishing performance indicators and a programme of targets and objectives to be achieved; establishing a database of all premises subject to RSA93 and to use it for work planning, resource targeting, and improvement to radioactive waste management; provision of systems of procedures and technical guidance to ensure nationally consistent and cost- effective regulation; establishing systems to audit the implementation of the procedures and guidance; ensuring quality of regulation by defining technical competencies of inspectors and the training programmes to secure them; an R and D programme targeted on improving radioactive waste management and radioactive substances regulation; and full and effective participation in development of national policy

  1. Implementation of structure-mapping inference by event-file binding and action planning: a model of tool-improvisation analogies.

    Science.gov (United States)

    Fields, Chris

    2011-03-01

    Structure-mapping inferences are generally regarded as dependent upon relational concepts that are understood and expressible in language by subjects capable of analogical reasoning. However, tool-improvisation inferences are executed by members of a variety of non-human primate and other species. Tool improvisation requires correctly inferring the motion and force-transfer affordances of an object; hence tool improvisation requires structure mapping driven by relational properties. Observational and experimental evidence can be interpreted to indicate that structure-mapping analogies in tool improvisation are implemented by multi-step manipulation of event files by binding and action-planning mechanisms that act in a language-independent manner. A functional model of language-independent event-file manipulations that implement structure mapping in the tool-improvisation domain is developed. This model provides a mechanism by which motion and force representations commonly employed in tool-improvisation structure mappings may be sufficiently reinforced to be available to inwardly directed attention and hence conceptualization. Predictions and potential experimental tests of this model are outlined.

  2. 75 FR 26892 - Approval and Promulgation of Implementation Plans; Texas; Excess Emissions During Startup...

    Science.gov (United States)

    2010-05-13

    ... corrective action to avoid a malfunction, then the event is considered an unplanned maintenance activity or... Promulgation of Implementation Plans; Texas; Excess Emissions During Startup, Shutdown, Maintenance, and... Emissions Events and Scheduled Maintenance, Startup, and Shutdown Activities. This action proposes approval...

  3. 29 CFR 1910.38 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An... plans. An emergency action plan must be in writing, kept in the workplace, and available to employees... information about the plan or an explanation of their duties under the plan. (d) Employee alarm system. An...

  4. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  5. Mid-Term Assessment of the EU Drugs Strategy 2013-2020 and Final Evaluation of the Action Plan on Drugs 2013-2016: Final report.

    Science.gov (United States)

    Emilie, Balbirnie; Matthew, Davies; Emma, Disley; Cristina Gonzalez, Monsalve; Stephen, Hartka; Stijn, Hoorens; Kristy, Kruithof; Martin, Sacher; Jirka, Taylor

    2018-01-01

    The aim of the EU Drugs Strategy 2013-2020 is to contribute to a reduction in drug demand and drug supply within the EU. The Strategy has so far been implemented by an Action Plan covering the period 2013-2016. This article sets out the findings of an evaluation that assesses the degree of implementation of the Strategy and the Action Plan in terms of outputs and, where possible, impacts. It looks at the extent to which the objectives of the Strategy have been achieved. The evaluation aims to provide evidence to support the European Commission's decision about whether to propose a new Action Plan for the period 2017-2020 and, if so, what changes would be needed compared to the current plan. Through applying a mixed-methods approach, the evaluation examined the effectiveness, efficiency, relevance and coherence of the actions undertaken on the basis of the EU Drugs Strategy and the Action Plan, as well as their EU added value. The evaluation makes 20 recommendations, addressed to the European Commission, Member States, the European Council and other stakeholders. The key recommendation for the Commission is that a new Action Plan should be implemented for the period 2017-2020. This should be an updated version of the current Action Plan, rather than taking a new approach or introducing more new actions.

  6. Analyzing barriers and facilitators to the implementation of an action plan to strengthen the midwifery professional role: a Moroccan case study.

    Science.gov (United States)

    Abou-Malham, Sabina; Hatem, Marie; Leduc, Nicole

    2015-09-15

    As part of a national strategy for reaching Millennium Development Goals 4 and 5 in Morocco, an action plan covering three systems (sociocultural, educational and professional) was developed to strengthen midwives' professional role in order to contribute to high quality maternity care. This study aimed to understand the implementation process by identifying the characteristics of this intervention and the dimensions of the three-systems which could act as barriers to/facilitators of the implementation process. We used a conceptual framework that builds on Hatem-Asmar's model that describes change in a health professional role; and on the Consolidated Framework for Implementation Research for our analysis. An embedded case study with three levels of analysis was conducted during June and July 2010. Data were collected through 11 semi-structured interviews, 20 focus groups, training session observations and documents. A purposive sample of 106 multi-stakeholders from two Moroccan regions (health professionals, academic staff, students, medical administrative officers and health programmers) and one international consultant were recruited. A thematic analysis was conducted using QDA Miner. Data showed a failure to carry out the plan as intended. Seventeen barriers and seven facilitators were identified. Misalignment of the values, methods, actors and targets of the sociocultural system with the values, methods and actors of the educational and professional systems, on one hand, and with the intervention, on the other hand, were likely the greatest impediments to implementing the plan. The bureaucratic structure and lack of readiness of the sociocultural system were among the most influential barriers to: dissemination of information, involvement of key actors in the process and readiness of the educational system. The main facilitators were the values promoted related to human rights, and the national and international policies to strengthen midwifery and reduce

  7. Developing Effective Corrective Action Plan in Krsko NPP

    International Nuclear Information System (INIS)

    Bach, Bruno; Cizmek, Rudi; Bozin, Bojan

    2014-01-01

    OE program regarding to developing effective and efficient corrective action plan based both on internal and industry events. It will describe the key steps of developing, implementing and assessing the effectiveness of corrective actions that address issues identified in the OE program and includes the following aspects: a. Developing effective corrective actions, b. Prioritizing corrective actions, c. Implementing corrective actions successfully, d. Assessing the effectiveness of the corrective actions. (authors)

  8. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  9. A Study on Promotion and Implementation of Cleaner Production Practices in Malaysian Industry - Development of a National Program and Action Plan for Promotion of Cleaner Production. Progress Report 1

    DEFF Research Database (Denmark)

    Wangel, Arne

    This Progress Report presents the initial findings of the research project 'A Study on Promotion and Implementation of Cleaner Production Practices in Malaysian Industry - Development of a National Program and Action Plan for Promotion of Cleaner Production. Progress Report' funded...

  10. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  11. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  12. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  13. 'Action 2016': AREVA's strategic action plan to improve performance

    International Nuclear Information System (INIS)

    Marie, Patricia; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 12, 2011, Luc Oursel, Executive Officer of AREVA, and Pierre Aubouin, Chief Financial Executive Officer, presented the group's 'Action 2016' strategic action plan based on an in-depth analysis of the market's outlook. This document makes, first, a Detailed presentation of the 'Action 2016' plan and then presents the group's financial outlook: - Full-year 2011 immediate accounting consequences of the new market environment: operating losses expected in 2011; - 2012-2013 transition period Objective: self-finance capex in cumulative terms; - 2014-2016: safe growth and cash generation, free operating cash flow at break-even beginning in 2013, above euro 1 bn per year beginning in 2015

  14. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  15. Commonwealth of the Northern Mariana Islands Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  16. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  17. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  18. Improving our legacy: Incorporation of adaptive management into state wildlife action plans

    Science.gov (United States)

    Fontaine, J.J.

    2011-01-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .

  19. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    Energy Technology Data Exchange (ETDEWEB)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  20. Failed fuel action plan guidelines: Special report

    International Nuclear Information System (INIS)

    1987-11-01

    The objective of this document is to provide a generic guideline that can be used to formulate a failed fuel action plan (FFAP) for specific application by a utility. This document is intended to be part of a comprehensive fuel reliability monitoring, management, and improvement program. The utilities may utilize this document as one resource in developing a failed fuel action plan. This document is not intended to be used as a failed fuel action plan standard. This document is intended to provide guidance on: management responsibilities; fuel performance parameters; cost/benefit analysis; action levels; long-term improvement methods; and data collection, analysis, and trending. 3 refs., 4 figs., 6 tabs

  1. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  2. What contributes to action plan enactment? Examining characteristics of physical activity plans.

    Science.gov (United States)

    Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U

    2017-11-01

    Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour

  3. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  4. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP's disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II

  5. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  6. Action understanding as inverse planning.

    Science.gov (United States)

    Baker, Chris L; Saxe, Rebecca; Tenenbaum, Joshua B

    2009-12-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the principle of rationality: the expectation that agents will plan approximately rationally to achieve their goals, given their beliefs about the world. The mental states that caused an agent's behavior are inferred by inverting this model of rational planning using Bayesian inference, integrating the likelihood of the observed actions with the prior over mental states. This approach formalizes in precise probabilistic terms the essence of previous qualitative approaches to action understanding based on an "intentional stance" [Dennett, D. C. (1987). The intentional stance. Cambridge, MA: MIT Press] or a "teleological stance" [Gergely, G., Nádasdy, Z., Csibra, G., & Biró, S. (1995). Taking the intentional stance at 12 months of age. Cognition, 56, 165-193]. In three psychophysical experiments using animated stimuli of agents moving in simple mazes, we assess how well different inverse planning models based on different goal priors can predict human goal inferences. The results provide quantitative evidence for an approximately rational inference mechanism in human goal inference within our simplified stimulus paradigm, and for the flexible nature of goal representations that human observers can adopt. We discuss the implications of our experimental results for human action understanding in real-world contexts, and suggest how our framework might be extended to capture other kinds of mental state inferences, such as inferences about beliefs, or inferring whether an entity is an intentional agent.

  7. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  8. 76 FR 36875 - Approval and Promulgation of Implementation Plans; South Carolina: Prevention of Significant...

    Science.gov (United States)

    2011-06-23

    ... requirements pertaining to NO X as an ozone precursor into the South Carolina SIP. b. NSR PM2.5 Rule With...-0958-201119; FRL-9322- 6] Approval and Promulgation of Implementation Plans; South Carolina: Prevention.... SUMMARY: EPA is taking final action to approve three revisions to the South Carolina State Implementation...

  9. Clean slate corrective action investigation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT)

  10. Clean slate corrective action investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  11. Increasing advance personal planning: the need for action at the community level.

    Science.gov (United States)

    Waller, Amy; Sanson-Fisher, Rob; Ries, Nola; Bryant, Jamie

    2018-05-09

    Advance personal planning is the process by which people consider, document and communicate their preferences for personal, financial and health matters in case they lose the ability to make decisions or express their wishes in the future. Advance personal planning is most often undertaken by individuals who are seriously ill, often in the context of a medical crisis and/or at the time of admission to hospital. However, the clinical utility and legal validity of the planning process may be compromised in these circumstances. Patients may lack sufficient capacity to meaningfully engage in advance personal planning; there may be insufficient time to adequately reflect on and discuss wishes with key others; and there may also be limited opportunity for inter-professional input and collaboration in the process. Here, we propose an agenda for research to advance the science of advance personal planning by promoting a 'whole community' approach. Adoption of advance personal planning at a community level may be achieved using a variety of strategies including public media campaigns, intervening with professionals across a range of health care and legal settings, and mobilising support from influential groups and local government. One potentially promising method for encouraging earlier adoption of advance personal planning among a broader population involves a community action approach, whereby multiple evidence-based strategies are integrated across multiple access points. Community action involves calling on community members, professionals, community and/or government organisations to work collaboratively to design and systematically implement intervention strategies with the aim of bringing about desired behaviour change. An example of a community action trial to improving uptake and quality of advance personal planning is described. While promising, there is a need for rigorous evidence to demonstrate whether a community action approach is effective in

  12. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Science.gov (United States)

    2013-12-26

    ...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Resources. This submission adopts a memorandum of agreement establishing transportation conformity criteria...-related control measures and mitigation measures. This proposed action streamlines the conformity process...

  13. 76 FR 28944 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-19

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). The districts are required under Part D of title I of the Clean Air Act (CAA) to adopt and implement a SIP-approved New Source Review (NSR) permit program. These rules update and revise the District's NSR permitting program for new and modified sources of air pollution. If EPA finalizes the limited approval and limited disapproval action, as proposed, then a sanctions clock would be triggered. We are taking comments on this proposal and plan to follow with a final action.

  14. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California..., this action: Is not a ``significant regulatory action'' subject to review by the Office of Management...

  15. The Danish Organic Action Plan 2020

    DEFF Research Database (Denmark)

    Sørensen, Nina Nørgaard; Lassen, Anne Dahl; Løje, Hanne

    2015-01-01

    Objective With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food...... procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Design Comparison study measuring organic food procurement by applying two different methods, one based on the use...... organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Subjects Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). Results A high significant correlation coefficient was found between the two...

  16. Implementation of a safety action plan: reduction of the dose limits in a research centre

    International Nuclear Information System (INIS)

    Deworm, J.P.

    1992-01-01

    The Belgian Regulations require an annual Action Plan to improve the Safety and health conditions of works. Taking into consideration the preliminary versions of the new ICRP-recommendations, the 1990 Action Plan of the Belgian research Centre aimed to reduce the personal dose limit to 20 mSv/year and the annual collective dose by 10%. Major means used in the campaign were sensibility through information, consultation between hierarchy and executors and the application of a policy of discouragement at certain limits. As a result, the maximum level reaches was 16.5 mSv, while only 7 people received a dose above 10 mSv (of 219 who received a measurable dose, mean value 3,4 mSv). This success is due to the commitment at all levels of responsibilities. In 1991, the 20 mSv-limit is imposed as an obligation by the management, and a feasibility study to impose 10 mSv in near future is being undertaken. (author)

  17. 75 FR 48864 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Hospital performed an air quality analysis to address the facility's impact on the SO 2 NAAQS. The facility... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency (MPCA) submitted the SIP...

  18. Environmental health action plan for Europe

    International Nuclear Information System (INIS)

    1994-06-01

    This Environmental Health Action Plan for Europe was endorsed by the second European Conference on Environment and Health, held in Helsinki, 20 to 22 June 1994. It sets out directions for the attainment of long term environment and health policy objectives define in the European Charter on Environment and Health. The Action Plan is primarily addressed at the public health and environmental protection sectors. 10 refs, 4 figs, 2 tabs

  19. Regional action plan handling of social welfare problem in nganjuk regency

    Science.gov (United States)

    Zain, IM; Utami, WS; Setyawan, KG

    2018-01-01

    Local action plans are expected to ensure a social protection for vulnerable and disadvantaged groups or PMKS. The method used in this research is by primary survey and secondary survey. The condition of the people who still belong to PMKS requires the state to come to the community to solve the problems faced. Stakeholders should be involved to handle PMKS. The activities presented should also receive periodic monitoring and evaluation so that there is progress reporting at any time. Implementable poverty reduction strategies and policies are social protection strategies, opportunity expansion strategies, resource capacity building strategies, community empowerment strategies and partnership strategies. The flow of PMKS is the validation and updating of data, the fulfillment of the basic needs of the PMKS family, the development of PMKS human resources, the improvement of the quality of life for poor families, the institutions of poverty alleviation stakeholders and the unemployed at the base level. The Regional Action Plan (RAP) is prepared as a reference in the context of carrying out PMKS mitigation which is expected to serve as a guide for managers and program implementers with relevant agencies that are conducted jointly and continuously for the period of time specified.

  20. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  1. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... action: Is not a ``significant regulatory action'' subject to review by the Office of Management and...

  2. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  3. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the

  4. Multidisciplinary and multisectoral coalitions as catalysts for action against antimicrobial resistance: Implementation experiences at national and regional levels.

    Science.gov (United States)

    Joshi, Mohan P; Chintu, Chifumbe; Mpundu, Mirfin; Kibuule, Dan; Hazemba, Oliver; Andualem, Tenaw; Embrey, Martha; Phulu, Bayobuya; Gerba, Heran

    2018-03-20

    The multi-faceted complexities of antimicrobial resistance (AMR) require consistent action, a multidisciplinary approach, and long-term political commitment. Building coalitions can amplify stakeholder efforts to carry out effective AMR prevention and control strategies. We have developed and implemented an approach to help local stakeholders kick-start the coalition-building process. The five-step process is to (1) mobilise support, (2) understand the local situation, (3) develop an action plan, (4) implement the plan, and (5) monitor and evaluate. We first piloted the approach in Zambia in 2004, then used the lessons learned to expand it for use in Ethiopia and Namibia and to the regional level through the Ecumenical Pharmaceutical Network [EPN]. Call-to-action declarations and workshops helped promote a shared vision, resulting in the development of national AMR action plans, revision of university curricula to incorporate relevant topics, infection control activities, engagement with journalists from various mass media outlets, and strengthening of drug quality assurance systems. Our experience with the coalition-building approach in Ethiopia, Namibia, Zambia, and with the EPN shows that coalitions can form in a variety of ways with many different stakeholders, including government, academia, and faith-based organisations, to organise actions to preserve the effectiveness of existing antimicrobials and contain AMR.

  5. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  6. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  7. Review and action plan for oral health improvement in Sheffield special schools.

    Science.gov (United States)

    Worsley, D J; Jones, K; Harris, J C; Charlesworth, J; Marshman, Z

    2018-03-01

    A description of the process of a review of oral health improvement in special schools in Sheffield and the implementation of an action plan for these activities. Public health competencies encompassed: assessing the evidence on oral health and dental interventions, programmes and services; strategic leadership and collaborative working for health; oral health improvement. Copyright© 2018 Dennis Barber Ltd.

  8. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  9. Radiation protection challenges into the 21st century. Action planning

    International Nuclear Information System (INIS)

    Bandle, A.M.

    2000-01-01

    Building on the work undertaken by the UK Health and Safety Executive in liaison with the wider health and safety community to examine emerging technological trends and their implications for occupational health and safety, a paper was produced for the Southport '99 International Symposium which looked at the likely impact on radiation protection. This paper reports on the next phase of the work which is designed to set the agenda for regulators, duty holders, qualified experts and other key stakeholders and intermediaries. Broad trends and themes determined by phase 1 of the work are translated into action plans aimed at anticipating the key challenges and exploiting the opportunities offered by technological developments for radiation protection purposes. These might equally be to achieve improved risk assessment and exposure characterisations of uncertain or novel practices (or interventions), to promote improved design of equipment and systems of work and adoption of inherently safer processes or procedures, to raise standards of competence in key workers and managers, or to encourage greater collaboration and joined up working between different groups of stakeholders and across national boundaries. The principle purpose of sharing this vision of the future is to encourage radiation protection professionals and others with an interest in radiation and nuclear technologies, to register an interest. It will only be by engagement that the priorities and activities proposed in the action plan can be refined and only by a team effort that the implementation plan can be fully realised. And then there is the next action plan to build and tackle....(author)

  10. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2010-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  11. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-11-22

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed

  12. Understanding what helps or hinders asthma action plan use: a systematic review and synthesis of the qualitative literature.

    Science.gov (United States)

    Ring, Nicola; Jepson, Ruth; Hoskins, Gaylor; Wilson, Caroline; Pinnock, Hilary; Sheikh, Aziz; Wyke, Sally

    2011-11-01

    To understand better what helps and/or hinders asthma action plan use from the professionals and patients/carers perspective. Systematic review and qualitative synthesis (using meta-ethnography). Nineteen studies (20 papers) were included in an analysis of patients/carers' and professionals' views. Seven main influences on action plan implementation were identified including perceived un-helpfulness and irrelevance of the plans. Translation and synthesis of the original authors' interpretations suggested that action plan promotion and use was influenced by professional and patient/carers' asthma beliefs and attitudes and patient/carer experiences of managing asthma. Action plan use is hindered because professionals and patients/carers have different explanatory models of asthma, its management and their respective roles in the management process. Patients/carers, based on their experiential knowledge of their condition, perceive themselves as capable, effective in managing their asthma, but health professionals do not always share this view. Professionally provided medically focused action plans that do not 'fit' with and incorporate the patients'/carers' views of asthma, and their management strategies, will continue to be under-utilised. Professionals need to develop a more patient-centred, partnership-based, approach to the joint development and review of action plans, recognising the experiential asthma knowledge of patients/carers. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  13. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  14. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  15. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  16. Friends Partnership Mentoring Program Action Plan

    Data.gov (United States)

    Department of the Interior — This Action Plan has been prepared to support Recommendation 11 of the U.S. Fish and Wildlife Service Refuge System’s “Conserving the Future”. The plan outlines a...

  17. Geotechnical engineering considerations in the NRC's review of uranium mill tailings remedial action plans

    International Nuclear Information System (INIS)

    Gillen, D.M.

    1985-01-01

    To reduce potential health hazards associated with inactive uranium mill tailings sites, the Department of Energy (DOE) is presently investigating and implementing remedial actions at 24 sites in the Uranium Mill Tailings Remedial Action Program (UMTRAP). All remedial actions must be selected and performed with the concurrence of the Nuclear Regulatory Commission (NRC). This paper provides a discussion of geotechnical engineering considerations during the NRC's preconcurrence review of proposed remedial action plans. In order for the NRC staff to perform an adequate geotechnical engineering review, DOE documents must contain a presentation of the properties and stability of all in-situ and engineered soil and rock which may affect the ability of the remedial action plans to meet EPA standards for long-term stability and control. Site investigations, laboratory testing, and remedial action designs must be adequate in scope and technique to provide sufficient data for the NRC staff to independently evaluate static and dynamic stability, settlement, radon attenuation through the soil cover, durability of rock for erosion protection, and other geotechnical engineering factors

  18. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  19. 76 FR 76302 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Redesignation of Lake and...

    Science.gov (United States)

    2011-12-07

    ...] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Redesignation of Lake and Porter...). ACTION: Final rule. SUMMARY: EPA is taking several related actions affecting Lake and Porter Counties and... redesignation of Lake and Porter Counties to attainment of the 1997 annual PM 2.5 standard. EPA is approving, as...

  20. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  1. 75 FR 13468 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-03-22

    ...EPA is proposing to disapprove a revision to the Monterey Bay Unified Air Pollution Control District (MBAPCD) portion of the California State Implementation Plan (SIP). This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbine generators. We are proposing action on a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  2. Development and Implementation of South Asia’s First Heat-Health Action Plan in Ahmedabad (Gujarat, India

    Directory of Open Access Journals (Sweden)

    Kim Knowlton

    2014-03-01

    Full Text Available Recurrent heat waves, already a concern in rapidly growing and urbanizing South Asia, will very likely worsen in a warming world. Coordinated adaptation efforts can reduce heat’s adverse health impacts, however. To address this concern in Ahmedabad (Gujarat, India, a coalition has been formed to develop an evidence-based heat preparedness plan and early warning system. This paper describes the group and initial steps in the plan’s development and implementation. Evidence accumulation included extensive literature review, analysis of local temperature and mortality data, surveys with heat-vulnerable populations, focus groups with health care professionals, and expert consultation. The findings and recommendations were encapsulated in policy briefs for key government agencies, health care professionals, outdoor workers, and slum communities, and synthesized in the heat preparedness plan. A 7-day probabilistic weather forecast was also developed and is used to trigger the plan in advance of dangerous heat waves. The pilot plan was implemented in 2013, and public outreach was done through training workshops, hoardings/billboards, pamphlets, and print advertisements. Evaluation activities and continuous improvement efforts are ongoing, along with plans to explore the program’s scalability to other Indian cities, as Ahmedabad is the first South Asian city to address heat-health threats comprehensively.

  3. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Nevada Site Office, Las Vegas, NV (United States)

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  4. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material - including lead plates, lead bricks, and lead-shielded cables was removed during the investigation and requires no additional corrective action.

  5. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  6. 78 FR 72033 - Approval and Promulgation of Implementation Plans; Florida: General Requirements and Gasoline...

    Science.gov (United States)

    2013-12-02

    ...] Approval and Promulgation of Implementation Plans; Florida: General Requirements and Gasoline Vapor Control... Protection (FDEP), related to the State's gasoline vapor recovery program. This correcting amendment corrects... . SUPPLEMENTARY INFORMATION: This action corrects inadvertent errors in a rulemaking related to Florida's gasoline...

  7. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  8. 78 FR 46552 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-08-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0659; FRL-9840-6] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year Carbon Monoxide Maintenance Plan for Colorado Springs AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule...

  9. 78 FR 46861 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-08-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0658; FRL-9840-8] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year Carbon Monoxide Maintenance Plan for Greeley AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY...

  10. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  11. A Local Action Plan (PAL to Combat Desertification in Apulia Region: Functional Integration of Existing Territorial Programs

    Directory of Open Access Journals (Sweden)

    Claudia Trotta

    2010-10-01

    Full Text Available In 2006-2007, the Italian National Committee to Combat Drought and Desertification promoted the execution of local action plans in some of the Italian regions. The aims of these plans were: to carry out specific actions at a local scale; to promote the integration of local policies; to involve the local communities in proposing strategies to be adopted; to harmonize the procedures among institutions in charge of adopting the policies. In this framework, ENEA carried out an evaluation of existing policies and programs to be considered in implementing a local action plan to combat desertification in the Apulia region. The application of the environmental and socio-economic measures of the regional Rural Development Plan 2007-2013 (PSR seemed to be an effective tool to positively influence human activities such as agriculture, breeding, and forestry, with the purpose of preserving or improving soil characteristics and overall environmental conditions, and eventually resulting in a reduction of desertification processes. Therefore, we proposed that these measures should be taken into account and effectively integrated into the Local Action Plan of the Apulia region. Additionally, we considered the four priority sectors identified by the National Action Plan (PAN to combat drought and desertification as the guiding principles to carry out our analysis. These sectors were: Soil Protection, Sustainable Water Management, Reduction of the Impact of Productive Activities, and Territorial Equilibrium. We also included Climate Change, in consideration of the alarming and urgent role it has assumed. The desertification-prone province of Foggia was selected as a pilot area in where to evaluate the influences that PSR measures can directly or indirectly have on desertification-related factors, and identify and implement specific actions. The Provincial Coordination Territorial Plan (PTCP of Foggia provided the basic land units for this analysis, the

  12. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Science.gov (United States)

    2012-06-27

    ... Prevention and Health Promotion, Division of Reproductive Health, Attn: National Public Health Action Plan... Disease Prevention and Health Promotion, Division of Reproductive Health, 4770 Buford Highway NE... topic's public health importance, existing challenges, and opportunities for action to decrease the...

  13. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  14. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    DEFF Research Database (Denmark)

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS......), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions to perform during a single turn guided by a fitness function that evaluates the quality of a particular state....... We compare OEP to different MCTS variations that constrain the exploration to deal with the high branching factor in the turn-based multi-action game Hero Academy. While the constrained MCTS variations outperform the vanilla MCTS implementation by a large margin, OEP is able to search the space...

  15. 75 FR 67623 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Volatile Organic...

    Science.gov (United States)

    2010-11-03

    ... Implementation Plan for Abbott Laboratories AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... site-specific rulemaking for certain of Abbott Laboratories' (Abbott) tunnel dryers and fluid bed... rulemaking for certain of Abbott Laboratories' (Abbott) tunnel dryers and fluid bed dryers. (i) Incorporation...

  16. Yukon Government climate change action plan

    International Nuclear Information System (INIS)

    2009-02-01

    This Climate Change Action Plan described the measures that are being taken by the Yukon Government to adapt to, understand, and reduce contributions to climate change. The action plan is the result of input received from more than 100 individuals and organizations and provides clear direction for a strategy that will minimize the negative impacts of climate change and provide economic, social and other environmental benefits through climate change mitigation. The Yukon government has already taken many actions that respond to climate change, such as: developing the Yukon Cold Climate Innovation Centre; supporting the Northern Climate Exchange for public education and outreach; funding community recycling depots and other groups that reduce waste generation, promote public awareness and divert solid waste; and working with provincial and territorial counterparts to enhance national building standards. The main objectives of the climate change actions are to enhance knowledge and understanding of climate change; adapt to climate change; reduce greenhouse gas emissions; and lead Yukon action in response to climate change. tabs., figs.

  17. 78 FR 56185 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-09-12

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0708; FRL-9900-87-Region 8] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year Carbon Monoxide Maintenance Plan for Fort Collins AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed...

  18. How to build science-action partnerships for local land-use planning and management: lessons from Durban, South Africa

    Directory of Open Access Journals (Sweden)

    Jessica Cockburn

    2016-03-01

    Full Text Available The gap between scientific knowledge and implementation in the fields of biodiversity conservation, environmental management, and climate change adaptation has resulted in many calls from practitioners and academics to provide practical solutions responding effectively to the risks and opportunities of global environmental change, e.g., Future Earth. We present a framework to guide the implementation of science-action partnerships based on a real-world case study of a partnership between a local municipality and an academic institution to bridge the science-action gap in the eThekwini Municipal Area, South Africa. This partnership aims to inform the implementation of sustainable land-use planning, biodiversity conservation, environmental management, and climate change adaptation practice and contributes to the development of human capacity in these areas of expertise. Using a transdisciplinary approach, implementation-driven research is being conducted to develop several decision-making products to better inform land-use planning and management. Lessons learned through this partnership are synthesized and presented as a framework of enabling actions operating at different levels, from the individual to the interorganizational. Enabling actions include putting in place enabling organizational preconditions, assembling a functional well-structured team, and actively building interpersonal and individual collaborative capacity. Lessons learned in the case study emphasize the importance of building collaborative capacity and social capital, and paying attention to the process of transdisciplinary research to achieve more tangible science, management, and policy objectives in science-action partnerships. By documenting and reflecting on the process, this case study provides conceptual and practical guidance on bridging the science-action gap through partnerships.

  19. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  20. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  1. Overview of IAEA Action Plan on Nuclear Safety

    International Nuclear Information System (INIS)

    Monti, Stefano

    2012-01-01

    The IAEA Action Plan represents a work programme to strengthen and improve nuclear safety world wide. The plan identifies actions for Member States and the IAEA. Success depends upon: • Cooperation between IAEA, Member States, and other stakeholders; • Availability of appropriate financial resources (MS voluntary contributions)

  2. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  3. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  4. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  5. Y-12 Site environmental protection program implementation plan (EPPIP)

    International Nuclear Information System (INIS)

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually

  6. Government of Canada Action Plan 2000 on Climate Change

    International Nuclear Information System (INIS)

    2000-01-01

    In this first National Climate Change Business Plan the Government of Canada affirms its intention to invest up to $500 million over five years on specific actions to reduce greenhouse gas emissions. This sum is in addition to the action plans being put forward by the provincial and territorial governments and in addition to the $625 million investment over five years announced in Budget 2000. Action Plan 2000 targets key sectors, and the measures announced are expected to take Canada one third of the way to achieving the target established in the Kyoto Protocol by reducing Canada's GHG emissions by 65 megatonnes per year during the 2008-2012 commitment period. The key sectors targeted include the areas of transportation, oil, gas and electricity production, industry, buildings, forestry and agriculture, i. e. sectors that together account for over 90 per cent of Canada's GHG emissions.The Action Plan focuses on reducing GHG emissions in a cost effective way; draws extensively on the best ideas put forward by the provinces, territories and other stakeholders; encourages action by industry and consumers; complements measures and actions by the provinces and territories to address regional issues; and sets the stage for long-term behavioural, technological and economic changes. The remainder of Canada's Kyoto commitments will be addressed by actions in future plans which are currently in the process of being developed, together with the development of further details of this first National Climate Change Business Plan

  7. Caribou conservation and recovery in Ontario: development and implementation of the Caribou Conservation Plan

    Directory of Open Access Journals (Sweden)

    Ted (E.R. Armstrong

    2012-03-01

    Full Text Available The range of Ontario’s woodland caribou (Rangifer tarandus caribou (forest-dwelling ecotype has receded northward substantially over many decades, leading to its current Threatened designation. Ontario released its Caribou Conservation Plan (CCP in the fall of 2009. This policy responded to public input and recommendations from the Ontario Woodland Caribou Recovery Team and the Caribou Science Review Panel, and outlines conservation and recovery actions to conserve and recover caribou. Within an adaptive management framework, the CCP builds upon a recent history of managing at large landscape scales in Ontario to implement a range management approach as the basis for recovery actions. These commitments and actions include enhanced research and monitoring, improved caribou habitat planning at the landscape scale, an integrated range analysis approach using advanced assessment tools to evaluate thresholds of habitat amount, arrangement and disturbance, the assessment of probability of persistence, consideration of cumulative effects, meeting forest management silvicultural performance requirements, consideration of caribou recovery implications when managing other wildlife, an initial focus on the southern edge of caribou distribution where threats are most significant, improved outreach and stewardship, and consideration of Aboriginal Traditional Knowledge in recovery actions. Implementation of the CCP signifies a long-term provincial commitment to caribou recovery, initially focusing on identified priorities within the CCP.

  8. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air...: EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions of the...

  9. 77 FR 6467 - Approval and Promulgation of Implementation Plans; Alabama, Georgia, and Tennessee: Chattanooga...

    Science.gov (United States)

    2012-02-08

    ... be CBI or otherwise protected. The www.regulations.gov Web site is an ``anonymous access'' system...; Particulate Matter 2002 Base Year Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION... 2.5 ) 2002 base year emissions inventory portion of the State Implementation Plan (SIP) revisions...

  10. 75 FR 40760 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Volatile Organic...

    Science.gov (United States)

    2010-07-14

    ... Implementation Plan for Abbott Laboratories AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... its SIP. These amendments consist of a site- specific rulemaking for certain of Abbott Laboratories' (Abbott) tunnel dryers and fluid bed dryers. This site-specific rule revision is approvable because it...

  11. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  12. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  13. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  14. Patient safety in the care of mentally ill people in Switzerland: Action plan 2016

    Science.gov (United States)

    Richard, Aline; Mascherek, Anna C; Schwappach, David L B

    2017-01-01

    Background: Patient safety in mental healthcare has not attracted great attention yet, although the burden and the prevalence of mental diseases are high. The risk of errors with potential for harm of patients, such as aggression against self and others or non-drug treatment errors is particularly high in this vulnerable group. Aim: To develop priority topics and strategies for action to foster patient safety in mental healthcare. Method: The Swiss patient safety foundation together with experts conducted round table discussions and a Delphi questionnaire to define topics along the treatment pathway, and to prioritise these topics. Finally, fields of action were developed. Results: An action plan was developed including the definition and prioritization of 9 topics where errors may occur. A global rating task revealed errors concerning diagnostics and structural errors as most important. This led to the development of 4 fields of action (awareness raising, research, implementation, and education and training) including practice-oriented potential starting points to enhance patient safety. Conclusions: The action plan highlights issues of high concern for patient safety in mental healthcare. It serves as a starting point for the development of strategies for action as well as of concrete activities.

  15. 78 FR 57573 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year...

    Science.gov (United States)

    2013-09-19

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2012-0475; FRL-9901-05-Region 8] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year PM 10 Maintenance Plan for Aspen AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  16. 78 FR 41342 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year...

    Science.gov (United States)

    2013-07-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2010-0389; FRL-9831-9] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year PM 10 Maintenance Plan for Ca[ntilde]on City AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  17. 78 FR 41307 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-07-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2010-0389; FRL-9832-1] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year PM 10 Maintenance Plan for Ca[ntilde]on City AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY...

  18. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  19. Measures for the Diffusion of Solar PV are Aligned in Technology Action Plans for Six Countries in Africa

    DEFF Research Database (Denmark)

    Nygaard, Ivan; Hansen, Ulrich Elmer; Pedersen, Mathilde Brix

    2014-01-01

    African countries from 2010 to 2013, dedicated government committees have prioritized climate change mitigation technologies and developed action plans for the diffusion of the selected technologies. The project results show that solar PV is high on the agenda in Africa. Six out of ten countries...... in the region prioritized solar PV, and action plans for the diffusion of solar home systems were put forward in Cote d’Ivoire, Kenya, Mali and Senegal, while the implementation of grid-connected systems was proposed in Rwanda, Mali and Senegal. The project reports and technology action plans prepared...... in these six countries are used as the basis for comparing how solar PV is perceived in these countries and how policy measures enabling environmental adjustments and investment programmes are being planned to promote diffusion of the technology in these different contexts....

  20. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  1. Territories climate plans: territories in action 21 collectivities involved in the climatic change challenge. 1. experiences collection 2007; Plans climat territoriaux: des territoires en action 21 collectivites engagees dans la releve du defi climatique. 1. recueil d'experiences 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The climate plan invites the collectivities to implement actions of greenhouse reduction. This collection presents the first collectivities involved in a climate approach: towns, natural parks, syndicates, general and regional council. (A.L.B.)

  2. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  3. Preservation of information about the repository for spent nuclear fuels - proposal for action plan; Bevarande av information om slutfoervar foer anvaent kaernbraensle - foerslag till handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina (Vattenfall Power Consultant AB, Stockholm (Sweden))

    2008-10-15

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  4. NIH Launches National COPD Action Plan | NIH MedlinePlus the Magazine

    Science.gov (United States)

    ... COPD Action Plan Follow us NIH Launches National COPD Action Plan Photo: National Heart, Lung, and Blood ... questions for NIH MedlinePlus magazine. Why was the COPD National Action Plan created? The staggering numbers associated ...

  5. Promoting the translation of intentions into action by implementation intentions: Behavioral effects and physiological correlates

    Directory of Open Access Journals (Sweden)

    Frank eWieber

    2015-07-01

    Full Text Available The present review addresses the physiological correlates of planning effects on behavior. Although intentions to act qualify as predictors of behavior, accumulated evidence indicates that there is a substantial gap between even strong intentions and subsequent action. One effective strategy to reduce this intention-behavior gap is the formation of implementation intentions that specify when, where, and how to act on a given goal in an if-then format (If I encounter situation Y, then I will initiate action Z!. It has been proposed that implementation intentions render the mental representation of the situation highly accessible and establish a strong associative link between the mental representations of the situation and the action. These process assumptions have been examined in behavioral research, and in physiological research, a field that has begun to investigate the temporal dynamics of and brain areas involved in implementation intention effects. In the present review, we first summarize studies on the cognitive processes that are central to the strategic automation of action control by implementation intentions. We then examine studies involving critical samples with impaired self-regulation. Lastly, we review studies that have applied physiological measures such as heart rate, cortisol level, and eye movement, as well as electroencephalography (EEG and functional magnetic resonance imaging (fMRI studies on the neural correlates of implementation intention effects. In support of the assumed processes, implementation intentions increased goal attainment in studies on cognitive processes and in critical samples, modulated brain waves related to perceptual and decision processes, and generated less activity in brain areas associated with effortful action control. In our discussion, we reflect on the status quo of physiological research on implementation intentions, methodological and conceptual issues, related research, and propose future

  6. Recommendation 93-5 Implementation Plan

    International Nuclear Information System (INIS)

    1994-01-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board (DNFSB) provided to the Secretary of Energy its Recommendation 93-5, which commented on the Hanford Tank Waste Characterization effort. Recommendation 93-5 highlighted the need to accelerate the characterization of the Hanford Site tank wastes to expedite the resolution of identified tank safety issues, and to provide timely design data in support of activities addressing the disposal of the tank wastes. The Department of Energy (DOE) and its prime contractor, Westinghouse Hanford Company (WHC), are in full agreement with the content of Recommendation 93-5 and have prepared this Implementation Plan to document those actions that have been or will be taken to meet Recommendation 93-5. The new Characterization Strategy embodied by this Plan acknowledges that waste distribution within a tank is the critical unknown with respect to successfully characterizing the tank for any Tank Waste Remediation Systems (TWRS) programmatic need. The new strategy has been incorporated into the following seven task: (1) strengthen technical management; (2) accelerate safety related characterization; (3) improve the quality and quantity of sampling (4) streamline tank access; (5) improve the quality and quantity of analyses; (6) improve data management; and (7) change control

  7. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  8. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  9. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  10. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  11. 77 FR 62147 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pittsburgh-Beaver...

    Science.gov (United States)

    2012-10-12

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pittsburgh-Beaver Valley Nonattainment Area... (EPA). ACTION: Final rule. SUMMARY: EPA is making two determinations regarding the Pittsburgh- Beaver... 12.7 Collocated Armstrong 42-005-0001 Kittaning......... 11.0 13.2 12.1 12.1 Incomplete \\2\\ Beaver 42...

  12. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  13. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    Energy Technology Data Exchange (ETDEWEB)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort

  14. Hungarian climate change action plan

    Energy Technology Data Exchange (ETDEWEB)

    Molnar, S.; Takacs, T. [Systemexpert Consulting Ltd., Budapest (Hungary); Arpasi, M. [MOL, Budapest (Hungary); Farago, T.; Palvoelgyi, T. [Ministry for Environment and Regional Policy, Budapest (Hungary); Harnos, Z. [Univ. of Horticulture, Budapest (Hungary); Lontay, Z. [EGI-Contracting Engineering Co. Ltd., Budapest (Hungary); Somogyi, Z. [Forest Research Inst., Budapest (Hungary); Tajthy, T. [Univ. of Technology, Budapest (Hungary)

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  15. Plan Generation and Evaluation Using Action Networks

    National Research Council Canada - National Science Library

    Peot, Mark

    2003-01-01

    ... from potential actions of the plan. Methods used to accomplish these results included the use of Action Networks, and development of a suite of analysis tools in support of the AFRL Campaign Assessment Tool...

  16. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices

  17. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  18. Territories climate plans: territories in action 21 collectivities involved in the climatic change challenge. 1. experiences collection 2007; Plans climat territoriaux: des territoires en action 21 collectivites engagees dans la releve du defi climatique. 1. recueil d'experiences 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The climate plan invites the collectivities to implement actions of greenhouse reduction. This collection presents the first collectivities involved in a climate approach: towns, natural parks, syndicates, general and regional council. (A.L.B.)

  19. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  20. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  1. 77 FR 50378 - Approval and Promulgation of Implementation Plans; Tennessee; Knoxville; Fine Particulate Matter...

    Science.gov (United States)

    2012-08-21

    ... protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking... inventory portion of the State Implementation Plan (SIP) revision submitted by the State of Tennessee on...

  2. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2011-08-17

    ... the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality standards... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  3. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2010-02-23

    ... the California State Implementation Plan, Imperial County Air Pollution Control District AGENCY... limited disapproval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of... soils in open and agricultural areas. We are proposing action on local rules that regulate these...

  4. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  5. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  6. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  7. Proposed Food and Drug Administration protective action guides for human food and animal feed: methods and implementation

    International Nuclear Information System (INIS)

    Schmidt, G.D.; Shleien, B.; Chiacchierini, R.P.

    1978-01-01

    The Food and Drug Administration's proposed recommendations to State and local agencies provide guidance on appropriate planning actions necessary for evaluating and preventing radioactive contamination of foods and animal feeds and the control and use of such products should they become contaminated. This presentation will cover the recommendations on implementation of the Preventive and Emergency PAG's. These recommendations include (1) the use of 'Dietary Factors' to obtain PAG's for specific food items from the general guidance, (2) procedures to be used for radionuclide mixtures and other radionuclides, (3) field and laboratory methods for the measurement of the level of contamination in the event of an incident and, (4) protective actions to be implemented by State and local agencies to limit the radiation dose to the public. Specific protective actions which should be considered for implementation when the projected dose exceeds the Preventive PAG are given for application to pasture, milk, fruits and vegetables, and grains. At the Emergency PAG level, the protective action decision is whether condemnation or other disposition is appropriate. (author)

  8. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  9. Territories climate plans: territories in action 21 collectivities involved in the climatic change challenge. 1. experiences collection 2007

    International Nuclear Information System (INIS)

    2007-01-01

    The climate plan invites the collectivities to implement actions of greenhouse reduction. This collection presents the first collectivities involved in a climate approach: towns, natural parks, syndicates, general and regional council. (A.L.B.)

  10. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  11. 77 FR 1873 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-01-12

    ... protected. The http://www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will... Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA... emissions inventory portion of the State Implementation Plan (SIP) revision submitted by the State of...

  12. 75 FR 31711 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Science.gov (United States)

    2010-06-04

    ... Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial... controlling nitrogen oxide (NOx) emissions from industrial boilers. This action is being taken under the Clean...--Control of Nitrogen Oxide Emissions from Industrial Boilers and Process Heaters at Petroleum Refineries in...

  13. Implementation plan for smart meters in Ontario

    International Nuclear Information System (INIS)

    2004-01-01

    This paper presents Ontario Energy Board's implementation plan to install 800,000 smart meters by December 31, 2007. The objective is to help consumers control their electricity bills through conservation and demand response. The three conditions that will change power consumption habits are price changes in response to demand and supply forces; the ability of consumers to see and respond to the price signals; and, a measurement of the response so that consumers get credit for their actions. This paper identifies the mandatory technical requirements for smart meters and the support operations of distributors. It sets priorities, identifies barriers and regulatory mechanisms for cost recovery. It also discusses options for ownership of the meters. 18 refs., 1 tab., 2 figs

  14. 30 CFR 46.4 - Training plan implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4..., SURFACE CLAY, COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.4 Training plan implementation. (a... accordance with the written training plan; (2) Presented by a competent person; and (3) Presented in language...

  15. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  16. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-05-23

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  17. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-12

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... not a ``significant regulatory action'' subject to review by the Office of Management and Budget under...

  18. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-01-25

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  19. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gustafason, D.L.

    2001-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential

  20. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9711-2] Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  1. 77 FR 12724 - Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-03-02

    ... protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA... emissions inventory, portion of the State Implementation Plan (SIP) revision submitted by the State of...

  2. 77 FR 12487 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-03-01

    ... protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA... emissions inventory, portion of the State Implementation Plan (SIP) revision submitted by the State of...

  3. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  4. Implementing of action plans for risk communication on the uranium mining sites remedy at Ningyo-toge Environmental Engineering Center (1) (Contract research)

    International Nuclear Information System (INIS)

    Yabuta, Naohiro; Kawai, Jun; Hikawa, Tamae; Tokizawa, Takayuki; Sato, Kazuhiko; Koga, Osamu

    2008-11-01

    On the closure of uranium mine site at Ningyo-Toge Environmental Engineering Center Japan Atomic Energy Agency, the action plans for risk communication with residence and local governments were developed and implemented. Under a practical program of the risk communication, an ethnographical research on Ningyo-Toge Environmental Engineering Center has been conducted by local high school students. The research was focused on several social groups such as engineers at the Center and residents around Ningyo-toge and described their circumstances from the past to the present, since the discovery of the uranium outcrop 1955. In addition, it should be noted that as a results, the research project led several effects listed below; 1) High school students understood significance of the uranium development projects implemented at Ningyo-toge, 2) Differences of standpoints between local residents and Ningyo-toge became clearer, 3) Foundation to communicate between local communities and Ningyo-toge was found out, and 4) The educational program on an ethnographical research was conducted autonomously by local high school students. (author)

  5. Monitoring and evaluation of Sustainable Energy Action Plan: Practice and perspective

    International Nuclear Information System (INIS)

    Delponte, Ilaria; Pittaluga, Ilaria; Schenone, Corrado

    2017-01-01

    The Sustainable Energy Action Plan (SEAP), promoted by the Covenant of Mayor, is a key tool for policies aimed at reducing fossil fuel consumption and GHG emissions, in accordance with the Kyoto protocol and its updates. To achieve an actual implementation of the SEAP and to obtain its expected targets, monitoring is a crucial component. SEAP monitoring has to look at both the progress of each single action and its global environmental effect, which requires more than one level of development. In the present paper, an integrated strategy for surveying, controlling and managing the SEAP through a “Monitoring and Evaluation” (M&E) process is introduced. The implementation in the city of Genoa, Italy, was used to test the efficacy of this approach and to assess its strengths and weaknesses. In particular, cost benefit analysis, bankability, peer review and participatory level were identified as key elements for obtaining an operative SEAP monitoring and for then fostering an effective environmental energy policy. Some recommendations were proposed to better outline the “Monitoring and Evaluation” methodology and to help other cities to define a strategy for SEAP monitoring and fulfilment. - Highlights: • SEAP monitoring is a key issue for urban energy policies. • Monitoring and evaluation for effective management of sustainable energy planning. • Lessons learned by monitoring the SEAP in the city of Genoa. • Monitoring strategy using CBA, bankability, peer reviewing and participatory level.

  6. 76 FR 59087 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Adhesives and Sealants Rule

    Science.gov (United States)

    2011-09-23

    ... Promulgation of Air Quality Implementation Plans; Delaware; Adhesives and Sealants Rule AGENCY: Environmental... manufacture, sale, use, or application of adhesives, sealants, primers, and solvents. This action is being... consists of Delaware's regulation for reducing VOCs from commercially-used adhesive and sealant products by...

  7. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  8. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  9. Building the Strategic Action Plan of the Vietnam Atomic Energy Institute during 2014-2019

    International Nuclear Information System (INIS)

    Hoang Sy Than; Tran Chi Thanh; Nguyen Hao Quang; Nguyen Nhi Dien; Nguyen Viet Hung; Tran Ngoc Toan; Mai Dinh Trung

    2015-01-01

    In the Decisions by the Prime Minister in the Strategy on Peaceful Utilization of Atomic Energy up to 2020, Vietnam Atomic Energy Institute (VINATOM) was assigned as the Technical Support Organization of the nuclear power projects; and as a key role-player in the decision-making process and in building the national nuclear power infrastructure. Therefore, Building the Strategic Action Plan (SAP) is necessary when VINATOM in present is facing several challenges of varying importance. This report will show the SAP of VINATOM during 2014-2019. The goal of SAP is to develop VINATOM up to the regional advanced level in the field of atomic energy application, such as radiation application, nuclear power and train human resources. The plan of Organizational development, Implementation roadmap and Implementation Solutions of SAP is presented in this report. (author)

  10. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  11. 77 FR 39938 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Regional Haze State...

    Science.gov (United States)

    2012-07-06

    ... the Environment (MDE), on February 13, 2012. This action is being taken in accordance with the... are listed in the www.regulations.gov Web site. Although listed in the electronic docket, some... Regional Haze Plan for the first implementation period through 2018. The formal SIP revision (MDE SIP...

  12. 78 FR 69337 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2

    Science.gov (United States)

    2013-11-19

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0672; FRL-9902-02-Region 5] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2 Air Quality Rule Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: On June 24, 2011, Ohio...

  13. 78 FR 69299 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2

    Science.gov (United States)

    2013-11-19

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0672; FRL-9902-03-Region 5] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2 Air Quality Rule Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: On June 24, 2011, Ohio...

  14. Opportunity costs of implementing forest plans

    Science.gov (United States)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  15. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Joomyung; Jae, Moosung [Hanyang Univ., Seoul (Korea, Republic of); Ahn, Kwangil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy.

  16. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    International Nuclear Information System (INIS)

    Lee, Joomyung; Jae, Moosung; Ahn, Kwangil

    2013-01-01

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy

  17. Implementation of an action plan in radiological protection of the patient in Argentina; Implementacion de un plan de accion en proteccion radiologica del paciente en la Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Michelin, S; Perez, M R; Dubner, D [Laboratorio de Radiopatologia, Autoridad Regulatoria Nuclear, Av. Del Libertador 8250 CP 1429, Buenos Aires (Argentina)

    2006-07-01

    consider the inclusion of topics of PRP in the medical grade formation. Work groups were constituted in Radiodiagnostic, Radiotherapy, Nuclear Medicine and the PRP of the pregnant woman that agreed the contents and chronograph of a work plan to short and medium term that is at the moment in execution. The continuity of this coordinated action facilitated the execution of the proposed objectives. In this communication the results obtained until the present of the action plan for the PRP implemented in the Argentina starting from the year 2004 are presented. (Author)

  18. West Valley demonstration project: Implementation of the kerosene mitigation plan

    International Nuclear Information System (INIS)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab

  19. Interest Deductibility and the BEPS Action Plan: nihil novi sub sole?

    OpenAIRE

    Traversa, Edoardo

    2013-01-01

    Interest payments between affiliated companies which aim at shifting profit from high to low tax countries are a well-known and frequently used tool in international tax planning. It is therefore not surprising that in the OECD Action Plan on Base Erosion and Profit Shifting (BEPS) (Action Plan) considerable attention is given to the measures limiting the deductibility of (excessive) intra-group interest payments.1 The Action Plan does not, however, provide any clear guidance as to which, amo...

  20. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  1. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  2. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-07-15

    ... Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY... guidance ``PAG Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents... ``anonymous access'' system, which means the EPA will not know your identity or contact information unless you...

  3. 29 CFR 1917.30 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans—(1) Scope and application. This paragraph (a) requires all employers to develop and... departments that can be contacted for further information or explanation of duties under the plan. (3) Alarm... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work...

  4. Exam Preparation: The Influence of Action Control, Procrastination and Examination Experience on Students' Goal Intention and Implementation Intention

    Science.gov (United States)

    Sommer, Lutz

    2013-01-01

    Introduction: In the framework of the intention-behavior-gap analysis in relation to exam preparation I examined whether intention--subdivided into goal and implementation intention--is influenced directly by the determinants action control, procrastination and examination experience which is consistent with the Theory of Planned Behavior and…

  5. SRS ES and H Standards Compliance Program Implementation Plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs

  6. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  7. Sales and operations planning : design and implementation of S&OP process in a multinational company

    OpenAIRE

    Lima, Gonçalo Maria Eva Ferreira Neves

    2013-01-01

    The company under scrutiny in this thesis is Aker Solutions Process Systems. As a part of the Aker Solutions group, Process Systems is a leading global supplier of processing equipment for oil, water and gas, operating worldwide. The company´s operational objective when implementing this process was to optimize the utilization of resources in it´s five different Business Units. The actions undertaken by the company to develop and implement a Sales and Operations Planning proces...

  8. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is taking direct final action to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP-approved Prevention of Significant Deterioration (PSD) permit programs. These revisions update the definitions used in the districts' PSD permit programs.

  9. Coral Reef Protection Implementation Plan

    National Research Council Canada - National Science Library

    Lobel, Lisa

    2000-01-01

    This document identify policies and actions to implement the Department of Defense's responsibilities under Executive Order 13089 on Coral Reef Protection, and are a requirement of the interim Task...

  10. An investigation into the relevance of action planning, theory of planned behaviour concepts, and automaticity for fruit intake action control.

    Science.gov (United States)

    de Bruijn, Gert-Jan; Wiedemann, Amelie; Rhodes, Ryan E

    2014-09-01

    In the action control framework, intention-behaviour discordance is studied around public health guidelines. Although this framework has been applied to physical activity behaviours, it has only seen very limited attention regarding fruit intake. The purpose of this study was therefore to investigate distributions and predictors of fruit intake intention-behaviour discordance. Prospective correlational design. Data were obtained from undergraduate students (n = 413) using validated questionnaires. Variables from the theory of planned behaviour, automaticity, and action planning were assessed at baseline, and fruit intake was assessed 2 weeks later. Data were analysed using discriminant function analyses and analyses of variance. The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. There was a larger proportion of fruit intake intenders amongst those who reported strong automatic fruit intake. Action control was predicted by fruit intake automaticity and affective attitudes, but the strongest predictor was perceived behavioural control. No action planning items were related to fruit intake action control. There is considerable asymmetry in the intention-fruit intake relationship. An application of the action control framework may stimulate debate on the applicability of intention-based models at the public health level. What is already known on this subject? Intention is theorized to be a key construct in fruit intake. Studies in the physical activity domain indicate that nearly half of the people with positive intentions fail to subsequently act. What does this study add? The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. Holding positive intentions is not sufficient to consume fruit at suggested public health guidelines. Perceived behavioural control is the most important predictor of fruit intake action control. © 2013 The British Psychological Society.

  11. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-07-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9830-5] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional...

  12. NEAP - National Environmental Action Plan (Republic of Macedonia)

    International Nuclear Information System (INIS)

    Shnajder-Jakobi, Martin; Anastasovski, Vasil; Gorgievski, Kire.

    1997-01-01

    The Republic of Macedonia, like other Central and East European countries in transition, has started the process of reform towards a market economy. As a part of the economic development program, the Republic of Macedonia is shaping its environmental polices and identifying priority actions to protect human health and the environment and to utilize its natural resources in a sustainable manner. These polices and actions are consistent with the 'Environmental Action Programme for Central and Eastern Europe' (EAP), the document adopted at the Ministerial Conference in Lucerne in 1993. In meeting the goals towards protecting the environment, The Government of the Republic of Macedonia has prepared the National Environmental Action Plan (NEAP) with the support of the World Bank group. The Ministry of Urban Planning, Construction and Environment was the key agency involved in the preparation of the NEAP. The NEAP highlights the environmental problems and recommends actions related to policy, institutions and priority investments. (author)

  13. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  14. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), authorizes the Department of Energy (DOE) to undertake remedial actions at 24 DOE designated processing sites. The term ''processing site,'' by statutory definition, means the inactive uranium mill or processing site and any other real property or improvement which is in the vicinity of the mill or processing site and is determined to be contaminated with residual radioactive materials derived from the mill or processing site. For purposes of this document, the inactive mill or processing site is referred to as the ''processing site'' and the other real property or improvement in the vicinity of such site is referred to as a 'vicinity property.'' The purpose of the remedial actions is to stabilize and control the uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner. Remedial actions undertaken by DOE are to be accomplished: With the full participation of the affected states and Indian tribes, in accordance with standards issued by the Environmental Protection Agency (EPA), and with the concurrence of the Nuclear Regulatory Commission (NRC). This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. 5 refs., 1 tab

  15. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    International Nuclear Information System (INIS)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.; Thieme, R.E.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a ''transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as ''buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containing mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs

  16. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  17. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  18. 19 CFR 210.49 - Implementation of Commission action.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Implementation of Commission action. 210.49 Section 210.49 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Determinations and Actions Taken § 210.49...

  19. 75 FR 37727 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-06-30

    ...EPA is finalizing disapproval of a revision to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on March 22, 2010. This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions, from a wide variety of sources. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this action identifies a deficiency that precludes approval of this SIP revision.

  20. PCAET to understand, to build, and to implement - Territorial climate-air-energy plan - Elected representatives, what is to be known about PCAETs - Territorial climate-air-energy plan

    International Nuclear Information System (INIS)

    Martin, Camille; Moille, Sandra; Legendre, Solenn; Vesine, Eric; Carrega, Marie; Brender, Pierre; Lunet, Joseph; Chabanel, Christiane; Saliou, Nelly

    2016-11-01

    A first document is a guide which presents what needs to be known about the regulatory evolution of French climate plans. A first part describes how energy transition can be an opportunity for a territory, and outlines what would be the cost of inaction. A second part explains how the PCAET supports local action in the struggle against climate change and air pollution, and describes its articulation with other planning tools, urban planning documents, and other individual and voluntary actions for a sustainable development. The third part describes the different steps for action: preparation of objectives, questions to be addressed, realisation of a territory diagnosis, elaboration of a territorial strategy, definition and support of an action plan, and practical aspects. It also proposes a focus on the different sectors: housing and office building, transports, agriculture, forests and soils, industry and other economic activities, energy production and distribution and development of renewable energies, wastes. A second document briefly presents the regulatory evolution of climate plans within the frame of the law on energy transition and for a green growth, mainly at the destination of elected representatives. It presents this new legal framework for the PCAET, its role and ambitions, the opportunities and benefits it gives to elected representatives, and some examples. It briefly describes the articulation of the plan with other planning tools and approaches to sustainable development, indicates the main steps for the plan elaboration and implementation, how to validate a PCAET

  1. Assessment of the 2004 Danish National Action Plan for Emplyment

    DEFF Research Database (Denmark)

    Emerek, Ruth

    The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive......The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive...

  2. Town of Canmore Energy Management Action Plan (EMAP)

    International Nuclear Information System (INIS)

    2005-03-01

    In 1999, the Town of Canmore, Alberta joined the Federation of Canadian Municipalities' Partners for Climate Protection (PCP) Program and committed to reducing greenhouse gas (GHG) emissions from municipal operations by 20 per cent and community-wide emissions by 6 per cent of 2000 levels by 2012. To date, the City has completed a baseline analysis for municipal operations and the community. It has also initiated an Energy Management Action Plan (EMAP) to identify opportunities in sustainable development through energy, GHG and air quality management. The broad community objectives include housing and transportation management, job creation and local economic development. The city has adopted The Natural Step (TNS) framework which defines sustainability and the guiding principles for decision-making. The objectives of EMAP are to define and evaluate options for a practical strategy and action plan to meet the city's GHG reduction targets; raise local awareness of the issues and opportunities of energy planning and GHG reductions and develop a local action plan outlining action items to reduce energy use and GHG emissions from municipal operations throughout the community. This report explained the methodology and framework for EMAP management and presented a community profile for the Town of Canmore. It also included an energy and emissions inventory and forecast with reference to corporate energy and emissions baseline; community energy and emissions baseline; corporate energy and emissions forecast; community energy and emissions forecast and corporate and community GHG targets. refs., tabs., figs

  3. 78 FR 28503 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ...: FRL-9812-4] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter...). ACTION: Direct final rule. SUMMARY: EPA is approving Indiana's request to revise the Lake and Porter... approving new MOVES2010a-based budgets for the Lake and Porter County, Indiana 1997 8-hour ozone maintenance...

  4. 77 FR 35327 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from the manufacture of polystyrene, polyethylene, and polypropylene products. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  5. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  6. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  7. Differential beta-band event-related desynchronization during categorical action sequence planning.

    Directory of Open Access Journals (Sweden)

    Hame Park

    Full Text Available A primate study reported the existence of neurons from the dorso-lateral prefrontal cortex which fired prior to executing categorical action sequences. The authors suggested these activities may represent abstract level information. Here, we aimed to find the neurophysiological representation of planning categorical action sequences at the population level in healthy humans. Previous human studies have shown beta-band event-related desynchronization (ERD during action planning in humans. Some of these studies showed different levels of ERD according to different types of action preparation. Especially, the literature suggests that variations in cognitive factors rather than physical factors (force, direction, etc modulate the level of beta-ERD. We hypothesized that the level of beta-band power will differ according to planning of different categorical sequences. We measured magnetoencephalography (MEG from 22 subjects performing 11 four-sequence actions--each consisting of one or two of three simple actions--in 3 categories; 'Paired (ooxx', 'Alternative (oxox' and 'Repetitive (oooo' ('o' and 'x' each denoting one of three simple actions. Time-frequency representations were calculated for each category during the planning period, and the corresponding beta-power time-courses were compared. We found beta-ERD during the planning period for all subjects, mostly in the contralateral fronto-parietal areas shortly after visual cue onset. Power increase (transient rebound followed ERD in 20 out of 22 subjects. Amplitudes differed among categories in 20 subjects for both ERD and transient rebound. In 18 out of 20 subjects 'Repetitive' category showed the largest ERD and rebound. The current result suggests that beta-ERD in the contralateral frontal/motor/parietal areas during planning is differentiated by the category of action sequences.

  8. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of

  9. Combining administrative data feedback, reflection and action planning to engage primary care professionals in quality improvement: qualitative assessment of short term program outcomes.

    Science.gov (United States)

    Vachon, Brigitte; Désorcy, Bruno; Gaboury, Isabelle; Camirand, Michel; Rodrigue, Jean; Quesnel, Louise; Guimond, Claude; Labelle, Martin; Huynh, Ai-Thuy; Grimshaw, Jeremy

    2015-09-18

    Improving primary care for chronic disease management requires a coherent, integrated approach to quality improvement. Evidence in the continuing professional development (CPD) field suggests the importance of using strategies such as feedback delivery, reflective practice and action planning to facilitate recognition of gaps and service improvement needs. Our study explored the outcomes of a CPD intervention, named the COMPAS Project, which consists of a three-hour workshop composed of three main activities: feedback, critical reflection and action planning. The feedback intervention is delivered face-to-face and presents performance indicators extracted from clinical-administrative databases. This aim of this study was to assess the short term outcomes of this intervention to engage primary care professional in continuous quality improvement (QI). In order to develop an understanding of our intervention and of its short term outcomes, a program evaluation approach was used. Ten COMPAS workshops on diabetes management were directly observed and qualitative data was collected to assess the intervention short term outcomes. Data from both sources were combined to describe the characteristics of action plans developed by professionals. Two independent coders analysed the content of these plans to assess if they promoted engagement in QI and interprofessional collaboration. During the ten workshops held, 26 interprofessional work teams were formed. Twenty-two of them developed a QI project they could implement themselves and that targeted aspects of their own practice they perceived in need of change. Most frequently prioritized strategies for change were improvement of systematic clientele follow-up, medication compliance, care pathway and support to improve adoption of healthier life habits. Twenty-one out of 22 action plans were found to target some level of improvement of interprofessional collaboration in primary care. Our study results demonstrate that the

  10. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  11. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-10-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9901-58-Region 9] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four... Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional Haze...

  12. Prairie Conservation in Canada: The Prairie Conservation Action Plan Experience

    Science.gov (United States)

    Dean Nernberg; David Ingstrup

    2005-01-01

    In Canada, grassland conservation has been mobilized and directed through the development of Prairie Conservation Action Plans and Action Plan Committees in the three prairie provinces of Alberta (45 partner agencies and organizations), Saskatchewan (26 partners), and Manitoba (26 partners). In Alberta, 43 percent of the native prairie remains; in Saskatchewan and...

  13. Planning, implementing and evaluating a social and communication skills course for riding instructors

    OpenAIRE

    Seefeld, Annika

    2016-01-01

    Social and emotional skills are very important for effective coaching. As research in this field is still very limited, the purpose of this study was to plan, implement and evaluate a course teaching social and emotional skills to riding instructors. The objective of this research project was to analyse the usefulness and feasibility of a social and communication skills course for riding instructors. The present research study is an educational action research case study approa...

  14. 78 FR 53250 - Approval and Promulgation of Air Quality Implementation Plans; State of Florida; Regional Haze...

    Science.gov (United States)

    2013-08-29

    ... implementation plans must also give specific attention to certain stationary sources that were in existence on... of the May 25, 2012, proposal action (77 FR 31242) was explicit that EPA was not proposing to...'') divided by distance from a Class I area (``d'') of 50 as the threshold for reasonable progress evaluation...

  15. Crossing the implementation chasm: a proposal for bold action.

    Science.gov (United States)

    Lorenzi, Nancy M; Novak, Laurie L; Weiss, Jacob B; Gadd, Cynthia S; Unertl, Kim M

    2008-01-01

    As health care organizations dramatically increase investment in information technology (IT) and the scope of their IT projects, implementation failures become critical events. Implementation failures cause stress on clinical units, increase risk to patients, and result in massive costs that are often not recoverable. At an estimated 28% success rate, the current level of investment defies management logic. This paper asserts that there are "chasms" in IT implementations that represent risky stages in the process. Contributors to the chasms are classified into four categories: design, management, organization, and assessment. The American College of Medical Informatics symposium participants recommend bold action to better understand problems and challenges in implementation and to improve the ability of organizations to bridge these implementation chasms. The bold action includes the creation of a Team Science for Implementation strategy that allows for participation from multiple institutions to address the long standing and costly implementation issues. The outcomes of this endeavor will include a new focus on interdisciplinary research and an inter-organizational knowledge base of strategies and methods to optimize implementations and subsequent achievement of organizational objectives.

  16. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  17. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  18. Implementing of action plans for risk communication on the uranium mining sites remedy at Ningyo-toge Environmental Engineering Center (2) (Contract research)

    International Nuclear Information System (INIS)

    Yabuta, Naohiro; Kawai, Jun; Hikawa, Tamae; Tokizawa, Takayuki; Sato, Kazuhiko; Koga, Osamu

    2008-11-01

    On the closure of uranium mine site at Ningyo-Toge Environmental Engineering Center Japan Atomic Energy Agency, the action plans for risk communication with residence and local governments were developed and implemented. Under a practical program of the risk communication, an ethnographical research on Ningyo-Toge Environmental Engineering Center has been conducted by local high school students. The research was focused on several social groups such as engineers at the Center and residents around Ningyo-Toge and described their circumstances from the past to the present, since the discovery of the uranium outcrop 1955. In the second year of the program, the results of the research were presented at symposium and the students had opportunities to exchange their views with others from different high schools that held in similar programs. Through those activities, the importance of the program was rediscovered and some new issues were also identified. (author)

  19. Strategies to overcome barriers to implementing osteoporosis and fracture prevention guidelines in long-term care: a qualitative analysis of action plans suggested by front line staff in Ontario, Canada.

    Science.gov (United States)

    Alamri, Sultan H; Kennedy, Courtney C; Marr, Sharon; Lohfeld, Lynne; Skidmore, Carly J; Papaioannou, Alexandra

    2015-08-01

    Osteoporosis is a major global health problem, especially among long-term care (LTC) facilities. Despite the availability of effective clinical guidelines to prevent osteoporosis and bone fractures, few LTC homes actually adhere to these practical recommendations. The purpose of this study was to identify barriers to the implementation of evidence-based practices for osteoporosis and fracture prevention in LTC facilities and elicit practical strategies to address these barriers. We performed a qualitative analysis of action plans formulated by Professional Advisory Committee (PAC) teams at 12 LTC homes in the intervention arm of the Vitamin D and Osteoporosis Study (ViDOS) in Ontario, Canada. PAC teams were comprised of medical directors, administrators, directors of care, pharmacists, dietitians, and other staff. Thematic content analysis was performed to identify the key themes emerging from the action plans. LTC teams identified several barriers, including lack of educational information and resources prior to the ViDOS intervention, difficulty obtaining required patient information for fracture risk assessment, and inconsistent prescribing of vitamin D and calcium at the time of admission. The most frequently suggested recommendations was to establish and adhere to standard admission orders regarding vitamin D, calcium, and osteoporosis therapies, improve the use of electronic medical records for osteoporosis and fracture risk assessment, and require bone health as a topic at quarterly reviews and multidisciplinary conferences. This qualitative study identified several important barriers and practical recommendations for improving the implementation of osteoporosis and fracture prevention guidelines in LTC settings.

  20. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  1. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  2. 77 FR 24883 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) from solid fuel fired boilers, steam generators and process heaters. We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  3. 77 FR 35329 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from crude oil production sumps and refinery wastewater separators. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  4. Action plan for 1965, Annex 2; Prilog br. 2 - Plan zadataka u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-12-15

    Action plan presented in this annex includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building. [Serbo-Croat] Plan zadataka obuhvata aktivnosti masinske i elektro grupe na preventivnom odrzavanju i planskom remontu sistema teske vode, sistema tehnicke vode, sistema helijuma, centralnog tela reaktora, sistema grejanja i ventilacije, sistema za snabdevanje elektricnom energijom, i ostalih pomocnih sistema u zgradi reaktora RA.

  5. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-06-21

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) and the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  6. 78 FR 922 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-01-07

    ...EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California Implementation Plan (SIP). These revisions concern local rules that regulate inhalable particulate matter (PM10) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County. We are proposing to approve local rules that regulate these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  7. Disentangling self-management goal setting and action planning: A scoping review.

    Directory of Open Access Journals (Sweden)

    Stephanie Anna Lenzen

    Full Text Available The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used.A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used.Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up. Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67% did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60% focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47% reported a theoretical framework.The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might

  8. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-01-19

    ...EPA is finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on September 6, 2011 and concerns oxides of nitrogen (NOX) emissions from biomass fuel-fired boilers. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this action simultaneously approves a local rule that regulates these emission sources and directs California to correct rule deficiencies.

  9. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  10. Predicting Plan Failure by Monitoring Action Sequences and Duration

    Directory of Open Access Journals (Sweden)

    Giovani Parente FARIAS

    2017-07-01

    Full Text Available An agent can attempt to achieve multiple goals and each goal can be achieved by applying various different plans. Anticipating failures in agent plan execution is important to enable an agent to develop strategies to avoid or circumvent such failures, allowing the agent to achieve its goal. Plan recognition can be used to infer which plans are being executed from observations of sequences of activities being performed by an agent. Symbolic Plan Recognition is an algorithm that represents knowledge about the agents under observation in the form of a plan library. In this work, we use this symbolic algorithm to find out which plan the agent is performing and we develop a failure prediction system, based on information available in the plan library and in a simplified calendar which manages the goals the agent has to achieve. This failure predictor is able to monitor the sequence of agent actions and detects if an action is taking too long or does not match the plan that the agent was expected to be performing. We have successfully employed this approach in a health-care prototype system.

  11. Action planning and position sense in children with Developmental Coordination Disorder

    NARCIS (Netherlands)

    Adams, I.L.; Ferguson, G.D.; Lust, J.M.; Steenbergen, B.; Smits-Engelsman, B.C.M.

    2016-01-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were

  12. Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

    1995-05-01

    The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

  13. Draft Mauritius Strategy for the further Implementation of the Programme of Action for the Sustainable Development of Small Island Developing States

    International Nuclear Information System (INIS)

    2005-01-01

    The Programme of Action for the Sustainable Development of Small Island Developing States remains the blueprint for small island developing States and the international community to address national and regional sustainable development in small island developing States that takes into account the economic, social and environmental aspects that are the pillars of the holistic and integrated approach to sustainable development. The Programme of Action sets out basic principles as well as specific actions that are required at the national, regional and international levels to support sustainable development in small island developing States. Along with the Barbados Programme of Action, the Rio Principles, the full implementation of Agenda 21, the Johannesburg Plan of Implementation and the outcomes of other relevant major United Nations conferences and summits, including the Monterrey Consensus, all contribute to the sustainable development of small island developing States

  14. 24 CFR 91.220 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development..., evaluate and reduce lead-based paint hazards, reduce the number of poverty-level families, develop...

  15. 24 CFR 91.320 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development...), evaluate and reduce lead-based paint hazards, reduce the number of poverty level families, develop...

  16. Practical planning extending the classical AI planning paradigm

    CERN Document Server

    Wilkins, David E

    2014-01-01

    Planning, or reasoning about actions, is a fundamental element of intelligent behavior--and one that artificial intelligence has found very difficult to implement. The most well-understood approach to building planning systems has been under refinement since the late 1960s and has now reached a level of maturity where there are good prospects for building working planners. Practical Planning is an in-depth examination of this classical planning paradigm through an intensive case study of SIPE, a significantly implemented planning system. The author, the developer of SIPE, defines the plann

  17. 78 FR 37130 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ...EPA is taking direct final action to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the California State Implementation Plan (SIP). This revision concerns volatile organic compound (VOC) emissions from architectural coatings. We are approving a local rule that regulates this emission source under the Clean Air Act (CAA or the Act).

  18. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 • 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

  19. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  20. 77 FR 66429 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-05

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compounds (VOC), carbon monoxide (CO), oxides of nitrogen (NOX), oxides of sulfur (SOX), and particulate matter (PM) emissions from glass melting furnaces. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  1. Body posture modulates action perception.

    Science.gov (United States)

    Zimmermann, Marius; Toni, Ivan; de Lange, Floris P

    2013-04-03

    Recent studies have highlighted cognitive and neural similarities between planning and perceiving actions. Given that action planning involves a simulation of potential action plans that depends on the actor's body posture, we reasoned that perceiving actions may also be influenced by one's body posture. Here, we test whether and how this influence occurs by measuring behavioral and cerebral (fMRI) responses in human participants predicting goals of observed actions, while manipulating postural congruency between their own body posture and postures of the observed agents. Behaviorally, predicting action goals is facilitated when the body posture of the observer matches the posture achieved by the observed agent at the end of his action (action's goal posture). Cerebrally, this perceptual postural congruency effect modulates activity in a portion of the left intraparietal sulcus that has previously been shown to be involved in updating neural representations of one's own limb posture during action planning. This intraparietal area showed stronger responses when the goal posture of the observed action did not match the current body posture of the observer. These results add two novel elements to the notion that perceiving actions relies on the same predictive mechanism as planning actions. First, the predictions implemented by this mechanism are based on the current physical configuration of the body. Second, during both action planning and action observation, these predictions pertain to the goal state of the action.

  2. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    Science.gov (United States)

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the

  3. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  4. Planning for Action: The Impact of an Asthma Action Plan Decision Support Tool Integrated into an Electronic Health Record (EHR) at a Large Health Care System.

    Science.gov (United States)

    Kuhn, Lindsay; Reeves, Kelly; Taylor, Yhenneko; Tapp, Hazel; McWilliams, Andrew; Gunter, Andrew; Cleveland, Jeffrey; Dulin, Michael

    2015-01-01

    Asthma is a chronic airway disease that can be difficult to manage, resulting in poor outcomes and high costs. Asthma action plans assist patients with self-management, but provider compliance with this recommendation is limited in part because of guideline complexity. This project aimed to embed an electronic asthma action plan decision support tool (eAAP) into the medical record to streamline evidence-based guidelines for providers at the point of care, create individualized patient handouts, and evaluate effects on disease outcomes. eAAP development occurred in 4 phases: web-based prototype creation, multidisciplinary team engagement, pilot, and system-wide dissemination. Medical record and hospital billing data compared frequencies of asthma exacerbations before and after eAAP receipt with matched controls. Between December 2012 and September 2014, 5174 patients with asthma (∼10%) received eAAPs. Results showed an association between eAAP receipt and significant reductions in pediatric asthma exacerbations, including 33% lower odds of requiring oral steroids (P < .001), compared with controls. Equivalent adult measures were not statistically significant. This study supports existing evidence that patient self-management plays an important role in reducing asthma exacerbations. We show the feasibility of leveraging technology to provide guideline-based decision support through an eAAP, addressing known challenges of implementation into routine practice. © Copyright 2015 by the American Board of Family Medicine.

  5. 29 CFR 1926.35 - Employee emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all...) Names or regular job titles of persons or departments who can be contacted for further information or... the employee in the event of an emergency. The written plan shall be kept at the workplace and made...

  6. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  7. Comparative assessment of national bioenergy strategies and biomass action plans in 12 EU countries. European Best Practice Report. Extended version

    International Nuclear Information System (INIS)

    2009-01-01

    This report is a key output of the EU project 'BAP Driver', an initiative of energy agencies from 8 European key bioenergy nations and the European Biomass Association (AEBIOM). The BAP Driver project aims at identifying ways for improvement of current national policy frameworks for bioenergy in Europe, and at leveraging the process of developing country-specific Biomass Action Plans (BAP). From a strategic perspective, the general approach of this report focuses on four stages, required for setting up national biomass strategies and action plans: Assessment of national biomass resources; Formulation of national bioenergy strategies and biomass action plans; Implementation of national bioenergy policies; Monitoring of national bioenergy markets and policies. Overall the analysis is split into three chapters corresponding to the following logical steps: Chapter B: Country analysis (12 individual country profiles); Chapter C: Benchmark analysis (comparative assessment of 12 countries); Chapter D: Best practice analysis (transnational conclusions across national boundaries)

  8. Comparative assessment of national bioenergy strategies and biomass action plans in 12 EU countries. European Best Practice Report. Executive Summary

    International Nuclear Information System (INIS)

    2009-01-01

    This report is a key output of the EU project 'BAP Driver', an initiative of energy agencies from 8 European key bioenergy nations and the European Biomass Association (AEBIOM). The BAP Driver project aims at identifying ways for improvement of current national policy frameworks for bioenergy in Europe, and at leveraging the process of developing country-specific Biomass Action Plans (BAP). From a strategic perspective, the general approach of this report focuses on four stages, required for setting up national biomass strategies and action plans: Assessment of national biomass resources; Formulation of national bioenergy strategies and biomass action plans; Implementation of national bioenergy policies; Monitoring of national bioenergy markets and policies. Overall the analysis is split into three chapters corresponding to the following logical steps: Chapter B: Country analysis (12 individual country profiles); Chapter C: Benchmark analysis (comparative assessment of 12 countries); Chapter D: Best practice analysis (transnational conclusions across national boundaries)

  9. Action plans can interact to hinder or facilitate reach performance.

    Science.gov (United States)

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  10. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  11. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.

  12. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    International Nuclear Information System (INIS)

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan

  13. Goal setting and action planning in the rehabilitation setting: development of a theoretically informed practice framework.

    Science.gov (United States)

    Scobbie, Lesley; Dixon, Diane; Wyke, Sally

    2011-05-01

    Setting and achieving goals is fundamental to rehabilitation practice but has been criticized for being a-theoretical and the key components of replicable goal-setting interventions are not well established. To describe the development of a theory-based goal setting practice framework for use in rehabilitation settings and to detail its component parts. Causal modelling was used to map theories of behaviour change onto the process of setting and achieving rehabilitation goals, and to suggest the mechanisms through which patient outcomes are likely to be affected. A multidisciplinary task group developed the causal model into a practice framework for use in rehabilitation settings through iterative discussion and implementation with six patients. Four components of a goal-setting and action-planning practice framework were identified: (i) goal negotiation, (ii) goal identification, (iii) planning, and (iv) appraisal and feedback. The variables hypothesized to effect change in patient outcomes were self-efficacy and action plan attainment. A theory-based goal setting practice framework for use in rehabilitation settings is described. The framework requires further development and systematic evaluation in a range of rehabilitation settings.

  14. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  15. City of North Vancouver greenhouse gas local action plan : final report

    International Nuclear Information System (INIS)

    Hood, I.

    2005-02-01

    This paper presented details of a greenhouse gas (GHG) local action plan developed as a result of the City of North Vancouver's participation in the Partners for Climate Protection Program (PCPP). The plan is intended to better manage the impacts of urban development related to GHG and air quality, while also achieving community objectives related to affordable housing, transportation management, job creation and economic development. The report reviewed the local emissions inventory in addition to various programs, plans, policies and by-laws relating to energy management. Potential policies and programs were identified to achieve GHG emissions reductions in accordance with the PCPP. A plan for emissions reductions was also presented. A situation analysis was presented with details of population, transportation, residential and commercial building and industry. Solid waste management and transportation plans were outlined. A GHG emissions profile and forecast was presented. An outline of a GHG management framework included information on initiatives in the city as well as details of public consultation feedback. A program implementation plan includes forecasts of the program's impact, as well as details of program delivery and a performance measurement framework. Proposed initiatives in the plan included new building guidelines; fuel switching for light and heavy duty vehicles; driver training and enhanced vehicle maintenance programs; and, an environmental procurement policy. Community programs include residential and commercial building retrofits; land use planning; support for community energy systems; green building design guidelines; transportation demand management; and, public engagement and outreach programs. 21 tabs., 9 figs

  16. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-05-01

    This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and

  17. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  18. Removal Action Work Plan for 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Morton, M.R.

    2000-01-01

    This document contains the removal action work plan for the 105-DR and 105-F Reactor buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site, which is owned and operated by the US Department of Energy (DOE), in Benton County, Washington. The 100 Areas (including the 100-D/DR and 100-F Areas) of the Hanford Site were placed on the US Environmental Protection Agency's (EPA's) National Priorities List under the ''Comprehensive Environmental Response, Compensation, and Liability Act of 1980'' (CERCLA). The DOE has determined that hazardous substances in the 105-DR and 105-F Reactor buildings and four ancillary facilities present a potential threat to human health or the environment. The DOE has also determined that a non-time critical removal action is warranted at these facilities. Alternatives for conducting a non-time critical removal action were evaluated in the ''Engineering Evaluation/Cost Analysis for the 105-DR and 105-F Reactor Facilities and Ancillary Facilities'' (DOE-RL 1998a). The engineering evaluation/cost analysis (EE/CA) resulted in the recommendation to decontaminate and demolish the contaminated reactor buildings (except for the reactor blocks) and the ancillary facilities and to construct a safe storage enclosure (SSE) over the reactor blocks. The recommendation was approved in an action memorandum (Ecology et al. 1998) signed by the Washington State Department of Ecology (Ecology), EPA, and DOE. The DOE is the agency responsible for implementing the removal actions in the 105-D/DR and 105-F Areas. Ecology is the lead regulatory agency for facilities in the 100-D/DR Area, and EPA is the lead regulatory agency for facilities in the 100-F Area. The term ''lead regulator agency'' hereinafter, refers to these authorities. This removal action work plan supports implementation of the non-time critical removal action

  19. 75 FR 56889 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ...EPA is taking direct final action to approve revisions to the San Diego County Air Pollution Control District (SDCAPCD) portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile organic compound (VOC). We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  20. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  1. Readability, suitability, and characteristics of asthma action plans: examination of factors that may impair understanding.

    Science.gov (United States)

    Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P

    2013-01-01

    Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.

  2. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  3. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  4. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    International Nuclear Information System (INIS)

    Evans, S. K.

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems

  5. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S. K.

    2007-11-07

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

  6. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  7. ORD Strategic Action Plan for Information Management / Information Technology 2011

    Science.gov (United States)

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  8. Determinants of bird conservation-action implementation and associated population trends of threatened species.

    Science.gov (United States)

    Luther, David A; Brooks, Thomas M; Butchart, Stuart H M; Hayward, Matt W; Kester, Marieke E; Lamoreux, John; Upgren, Amy

    2016-12-01

    Conservation actions, such as habitat protection, attempt to halt the loss of threatened species and help their populations recover. The efficiency and the effectiveness of actions have been examined individually. However, conservation actions generally occur simultaneously, so the full suite of implemented conservation actions should be assessed. We used the conservation actions underway for all threatened and near-threatened birds of the world (International Union for Conservation of Nature Red List of Threatened Species) to assess which biological (related to taxonomy and ecology) and anthropogenic (related to geoeconomics) factors were associated with the implementation of different classes of conservation actions. We also assessed which conservation actions were associated with population increases in the species targeted. Extinction-risk category was the strongest single predictor of the type of conservation actions implemented, followed by landmass type (continent, oceanic island, etc.) and generation length. Species targeted by invasive nonnative species control or eradication programs, ex situ conservation, international legislation, reintroduction, or education, and awareness-raising activities were more likely to have increasing populations. These results illustrate the importance of developing a predictive science of conservation actions and the relative benefits of each class of implemented conservation action for threatened and near-threatened birds worldwide. © 2016 Society for Conservation Biology.

  9. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    Science.gov (United States)

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  10. Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized

  11. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Science.gov (United States)

    2010-07-01

    ... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding), the... is determined. (2) If EPA disapproves a submitted control strategy implementation plan revision...

  12. Implementation plan for the new production reactor capacity environmental impact statement

    International Nuclear Information System (INIS)

    1989-12-01

    The US Department of Energy (DOE) proposed to site, construct, and operate new production reactor (NPR) capacity intended primarily to produce tritium and secondarily to produce plutonium for the US nuclear weapons program. DOE studies show that this new capacity is needed to ensure reliable maintenance of the nation's nuclear weapons stockpile. It also is essential that these necessary nuclear materials be produced in a safe and environmentally sound manner. The DOE has determined that this proposed action constitutes a major federal action that may significantly affect the quality of the human environment; therefore, the DOE will prepare an environmental impact statement (EIS) to assess the potential impacts of the proposed action and reasonable alternatives on the human and natural environment. The EIS will be prepared in accordance with the National Environmental Policy Act of 1969, as implemented in regulations promulgated by the Council on Environmental Quality (CEQ). This EIS implementation plan (IP) includes a description of the proposed action, descriptions of alternatives, a summary of EIS assumptions, a list of environmental issues to be considered in the EIS (including those identified during public scoping activities), a list of proposed agency consultations, a schedule for EIS preparation and related activities, and an annotated outline for the EIS. It is the Department's intent that the EIS on the NPR capacity will serve as the programmatic National Environmental Policy Act (NEPA) review of modernization of DOE defense nuclear materials production of tritium and plutonium. The Department is currently developing a NEPA compliance strategy for modernization of the remainder of the nuclear weapons production complex, which will reference the EIS on NPR capacity. 7 refs., 8 tabs

  13. Electric driving accelerated. Action Plan 2011-2015. Annex 2

    International Nuclear Information System (INIS)

    2011-10-01

    The Dutch Action Plan for Electric Driving gives form and substance to the ambition of the Dutch government to accelerate the market introduction of electric cars in the Netherlands. This plan is not only focused on the electric passenger car. To promote the electrification of transport, also electric garbage trucks, buses, scooters and possibly pleasure boats are included in the plan. [nl

  14. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2011-01-01

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  15. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08

  16. The Search Conference as a Method in Planning Community Health Promotion Actions

    Science.gov (United States)

    Magnus, Eva; Knudtsen, Margunn Skjei; Wist, Guri; Weiss, Daniel; Lillefjell, Monica

    2016-01-01

    Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives. Significance for public health This article describe and discuss how the Search conference can be used as a method when working with knowledge based health promotion actions in local communities. The article describe the sequences of the conference and shows how this have been adapted when planning and prioritizing health promotion actions in three Norwegian municipalities. The significance of the article is that it shows how central elements in the planning of health promotion actions, as participation and involvements as well as evidence was a fundamental thinking in how the conference were accomplished. The article continue discussing how the method function as both a top-down and a bottom-up strategy, and in what way working evidence based can be in conflict with a bottom-up strategy. The experiences described can be used as guidance planning knowledge based health promotion actions in communities. PMID:27747199

  17. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  18. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  19. Tackling non-point source water pollution in British Columbia: An action plan

    Energy Technology Data Exchange (ETDEWEB)

    1998-01-01

    Efforts to protect British Columbia water quality by regulating point discharges from municipal and industrial sources have generally been successful, and it is recognized that the major remaining cause of water pollution in the province is from non-point sources. These sources are largely unregulated and associated with urbanization, agriculture, and other forms of land development. The first part of this report reviews the provincial commitment to clean water, the effects of non-point-source (NPS) pollution, and the management of NPS in the province. Part 2 describes the main causes of NPS in British Columbia: Land development, agriculture, stormwater runoff, on-site sewage systems, forestry and range activities, atmospheric deposition, and boating/marine activities. Finally, it presents key components of the province's NPS action plan: Education and training, prevention at site, land use planning and co-ordination, assessment and reporting, economic incentives, legislation and regulation, and implementation.

  20. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  1. Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  2. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document

  3. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  4. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  5. 78 FR 69773 - Approval and Promulgation of Implementation Plans; Texas; Control of Air Pollution by Permits for...

    Science.gov (United States)

    2013-11-21

    ...EPA is taking a direct final action to approve portions of two revisions to the Texas State Implementation Plan (SIP) concerning the Permits for Specific Designated Facilities Program, also referred to as the FutureGen Program. EPA has determined that the portions of these SIP revisions specific to the FutureGen Program submitted on March 9, 2006 and July 2, 2010, comply with the Clean Air Act and EPA regulations and are consistent with EPA policies. This action is being taken under section 110 and parts C and D of the Act.

  6. Musical genre-dependent behavioural and EEG signatures of action planning. A comparison between classical and jazz pianists.

    Science.gov (United States)

    Bianco, R; Novembre, G; Keller, P E; Villringer, A; Sammler, D

    2018-04-01

    It is well established that musical training induces sensorimotor plasticity. However, there are remarkable differences in how musicians train for proficient stage performance. The present EEG study outlines for the first time clear-cut neurobiological differences between classical and jazz musicians at high and low levels of action planning, revealing genre-specific cognitive strategies adopted in production. Pianists imitated chord progressions without sound that were manipulated in terms of harmony and context length to assess high-level planning of sequence-structure, and in terms of the manner of playing to assess low-level parameter specification of single acts. Jazz pianists revised incongruent harmonies faster as revealed by an earlier reprogramming negativity and beta power decrease, hence neutralising response costs, albeit at the expense of a higher number of manner errors. Classical pianists in turn experienced more conflict during incongruent harmony, as shown by theta power increase, but were more ready to implement the required manner of playing, as indicated by higher accuracy and beta power decrease. These findings demonstrate that specific demands and action focus of training lead to differential weighting of hierarchical action planning. This suggests different enduring markers impressed in the brain when a musician practices one or the other style. Copyright © 2018 Elsevier Inc. All rights reserved.

  7. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-06

    ...EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on April 26, 2012 and concerns oxides of nitrogen (NOX) from solid fuel fired boilers. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act).

  8. 77 FR 71129 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2012-11-29

    ...EPA is finalizing approval of revisions to the SJVUAPCD and SCAQMD portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on June 21, 2012 and concerns volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  9. 78 FR 6736 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern Volatile Organic Compound (VOC), oxides of nitrogen (NOX), and particulate matter (PM) emissions from open burning. We are approving local rules that regulate this emission source under the Clean Air Act (CAA or the Act).

  10. The neural basis of predicting the outcomes of planned actions

    Directory of Open Access Journals (Sweden)

    Andrew eJahn

    2011-11-01

    Full Text Available A key feature of human intelligence is the ability to predict the outcomes of one’s own actions prior to executing them. Action values are thought to be represented in part in the dorsal and ventral medial prefrontal cortex, yet current studies have focused on the value of executed actions rather than the anticipated value of a planned action. Thus, little is known about the neural basis of how individuals think (or fail to think about their actions and the potential consequences before they act. We scanned individuals with fMRI while they thought about performing actions that they knew would likely be correct or incorrect. Here we show that merely imagining an error, as opposed to imagining a correct outcome, increases activity in the dorsal anterior cingulate cortex, independently of subsequent actions. This activity overlaps with regions that respond to actual error commission. The findings show a distinct network that signals the prospective outcomes of one’s planned actions. A number of clinical disorders such as schizophrenia and drug abuse involve a failure to take the potential consequences of an action into account prior to acting. Our results thus suggest how dysfunctions of the medial prefrontal cortex may contribute to such failures.

  11. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  12. Heart Truth for Women: An Action Plan

    Science.gov (United States)

    ... only treatment that some people need. Kick the Smoking Habit There is nothing easy about giving up cigarettes, but with a plan of action, you can do it. Become aware of your personal smoking “triggers”—the situations that typically bring on the ...

  13. Structural priming, action planning, and grammar.

    Science.gov (United States)

    MacDonald, Maryellen C; Weiss, Daniel J

    2017-01-01

    Structural priming is poorly understood and cannot inform accounts of grammar for two reasons. First, those who view performance as grammar + processing will always be able to attribute psycholinguistic data to processing rather than grammar. Second, structural priming may be simply an example of hysteresis effects in general action planning. If so, then priming offers no special insight into grammar.

  14. 14 CFR 437.73 - Anomaly recording, reporting and implementation of corrective actions.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Anomaly recording, reporting and implementation of corrective actions. 437.73 Section 437.73 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION... Requirements § 437.73 Anomaly recording, reporting and implementation of corrective actions. (a) A permittee...

  15. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  16. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  17. Action plan for photovoltaic standards

    Energy Technology Data Exchange (ETDEWEB)

    Oldach, R.

    1999-07-01

    This report examines the present situation regarding international standards governing photovoltaic (PV) systems and components, and seeks to identify barriers to the commercialisation of PV systems in the UK due to the absence of standards and codes of practice, and develop an action plan to overcome these barriers. An overview of standardisation bodies and standard generation mechanisms is presented, and the PV cells and modules, stand-alone PV systems, utility interconnection with PV systems, and building integration of PV are reviewed.

  18. Implementation of the monitoring Plan of the State and behavior of the systems in the Central Nuclear Almaraz

    International Nuclear Information System (INIS)

    Montero Puertas, I.; Gonzalez Redondo, R.; Lopez Pozo, A.

    2013-01-01

    This work aims to present the implementation process of the Monitoring of the State and behavior of the systems in the Nuclear plan Almaraz. Will define the scope, process, frequencies and criteria of evaluation of the State and behavior of the systems included in the Plan of reliability, as well as the documentary requirements of this evaluation. Cases will also be collected practical real phenomena detected during monitoring degradation made and will explain the actions taken prior to the failure.

  19. Promoting Action on Research Implementation in Health Services framework applied to TeamSTEPPS implementation in small rural hospitals.

    Science.gov (United States)

    Ward, Marcia M; Baloh, Jure; Zhu, Xi; Stewart, Greg L

    A particularly useful model for examining implementation of quality improvement interventions in health care settings is the PARIHS (Promoting Action on Research Implementation in Health Services) framework developed by Kitson and colleagues. The PARIHS framework proposes three elements (evidence, context, and facilitation) that are related to successful implementation. An evidence-based program focused on quality enhancement in health care, termed TeamSTEPPS (Team Strategies and Tools to Enhance Performance and Patient Safety), has been widely promoted by the Agency for Healthcare Research and Quality, but research is needed to better understand its implementation. We apply the PARIHS framework in studying TeamSTEPPS implementation to identify elements that are most closely related to successful implementation. Quarterly interviews were conducted over a 9-month period in 13 small rural hospitals that implemented TeamSTEPPS. Interview quotes that were related to each of the PARIHS elements were identified using directed content analysis. Transcripts were also scored quantitatively, and bivariate regression analysis was employed to explore relationships between PARIHS elements and successful implementation related to planning activities. The current findings provide support for the PARIHS framework and identified two of the three PARIHS elements (context and facilitation) as important contributors to successful implementation. This study applies the PARIHS framework to TeamSTEPPS, a widely used quality initiative focused on improving health care quality and patient safety. By focusing on small rural hospitals that undertook this quality improvement activity of their own accord, our findings represent effectiveness research in an understudied segment of the health care delivery system. By identifying context and facilitation as the most important contributors to successful implementation, these analyses provide a focus for efficient and effective sustainment of Team

  20. 76 FR 30025 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from surface coating of metal parts and products. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  1. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  2. The impact of participation in strategic planning and action planning on management control effectiveness: An analysis of independent and joint effects

    OpenAIRE

    Bedford, David S.; Bednark, Piotr; Dossi, Andrea; Ditillo, Angelo; Gosselin, Maurice; Madsen, Dag Øivind

    2016-01-01

    This research paper examines the independent and joint effects of participation in strategic planning and action planning. There is extensive research about employee participation in both the fields of strategic planning and budgeting. However, there is a lack of research about the interaction between participation in strategic planning and budgeting. Drawing on the research on participation in decision-making processes, the hypothesis is that strategic planning and action plan...

  3. The Extrastriate Body Area Computes Desired Goal States during Action Planning.

    Science.gov (United States)

    Zimmermann, Marius; Verhagen, Lennart; de Lange, Floris P; Toni, Ivan

    2016-01-01

    How do object perception and action interact at a neural level? Here we test the hypothesis that perceptual features, processed by the ventral visuoperceptual stream, are used as priors by the dorsal visuomotor stream to specify goal-directed grasping actions. We present three main findings, which were obtained by combining time-resolved transcranial magnetic stimulation and kinematic tracking of grasp-and-rotate object manipulations, in a group of healthy human participants (N = 22). First, the extrastriate body area (EBA), in the ventral stream, provides an initial structure to motor plans, based on current and desired states of a grasped object and of the grasping hand. Second, the contributions of EBA are earlier in time than those of a caudal intraparietal region known to specify the action plan. Third, the contributions of EBA are particularly important when desired and current object configurations differ, and multiple courses of actions are possible. These findings specify the temporal and functional characteristics for a mechanism that integrates perceptual processing with motor planning.

  4. 12 CFR 704.10 - Investment action plan.

    Science.gov (United States)

    2010-01-01

    ... market pricing, cash flows, and risk; (3) How the investment fits into the credit union's asset and... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an...

  5. Plan d'action pour la conservation des espèces d'oiseaux inscrites ...

    African Journals Online (AJOL)

    This List includes fifteen species of bird, and at the thirteenth Conference of the Parties in Catania, Sicily in November 2003, an Action Plan for the conservation of these species was adopted, following similar plans on monk seal, marine turtles, cetaceans and marine vegetation. The Action Plan for Birds notes initiatives ...

  6. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  7. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  8. Smoking Cessation in Cardiac Patients: The Influence of Action Plans, Coping Plans and Self-Efficacy on Quitting Smoking

    Science.gov (United States)

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-01-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac…

  9. National Biofuels Action Plan, October 2008

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  10. 29 CFR 1608.4 - Establishing affirmative action plans.

    Science.gov (United States)

    2010-07-01

    ... taken pursuant to an affirmative action plan or program must be reasonable in relation to the problems... remedy the situation. Such steps, which in design and execution may be race, color, sex or ethnic...

  11. DEVELOPMENT AND IMPROVEMENT OF BUSINESS HIGHER EDUCATION THROUGH IMPLEMENTATION OF STUDENTS LEARNING OUTCOMES ASSESSMENT PLAN (SLOAP

    Directory of Open Access Journals (Sweden)

    Zoran Ivanovski

    2013-03-01

    Full Text Available This study presents new vision how to upgrade business higher education at the Faculty of Economics at University of Tourism and Management in Skopje (UTMS. This paper is result of analyses of best practices of leading higher education institutions as well authors experience in higher education and business education and practice. The UTMS is orientated to introduce best practices and objective standards in order to offer high-quality business education for its students. UTMS has mission for permanent implementation of quality improvement measures as a way to achieve high professional and academic standards and become part of prosperous and respective Universities. In order to achieve this goal, UTMS plan to use additional measures, outcomes assessment as a way to measure institutional effectiveness, as well as effective technique for identifying where changes and improvements are necessary. UTMS has developed Students Learning Outcomes Assessment Plan (SLOAP as a way to reach this goal.Based on permanent analysis of students needs as well as business sector suggestions about desirable level of knowledge, skills and competence of the students from Faculty of Economics, gained from conducted evaluations, UTMS decide to make additional improvement and development of business education. This process have 4 phases: 1 evaluation of students attitude towards curricula and the instructors efficiency, 2preparation of the SLOAP (Student Learning Outcomes Assessment Plan document, 3 implementation of two direct measures from the SLOAP through assessment analysis and action planning, and 4 monitoring changes and improvements made as a result of action planning.The first phase was completed in spring semester 2012, as well as second one with development of Comprehensive Exam and Capstone Course as direct measures. Complete SLOAP also has indirect measures like student satisfaction inventory, course evaluations, alumni, and employers’ surveys, and a

  12. The Second Physical Therapy Summit on Global Health: developing an action plan to promote health in daily practice and reduce the burden of non-communicable diseases

    DEFF Research Database (Denmark)

    Meyer, Erna Rosenlund; Dean,, Elizabeth

    2013-01-01

    . Working questions were: (1) how well is health promotion implemented within physical therapy practice; and (2) how might this be improved across five target audiences (i.e. physical therapist practitioners, educators, researchers, professional body representatives, and government liaisons......-focused physical therapy as a clinical competency across regions and within target audiences. Participants agreed that healthfocused practice is a professional priority, and a strategic action plan was needed to develop it as a clinical competency. The action plan and recommendations largely paralleled...

  13. Capacity Development and Strengthening for Energy Policy formulation and implementation of Sustainable Energy Projects in Indonesia CASINDO. Deliverable No. 25. Renewable Energy Action Plan of West Nusa Tenggara Province 2010-2025

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-08-15

    The overall objective of the CASINDO programme is to establish a self-sustaining and self-developing structure at both the national and regional level to build and strengthen human capacity to enable the provinces of North Sumatra, Yogyakarta, Central Java, West Nusa Tenggara and Papua to formulate sound policies for renewable energy and energy efficiency and to develop and implement sustainable energy projects. This report is expected to become a reference for government and private sectors in the development of renewable energy in West Nusa Tenggara Province, not only the development of renewable energy for electricity generation, but also for other needs such as fuel for industry and cooking fuel for households. The Renewable Energy Action Plan of West Nusa Tenggara Province is a follow-up of the enactment of Presidential Regulation No. 5 Year 2006 concerning National Energy Policy, which the Central Government has set a target utilization of renewable energy by 2025 by 17%. Furthermore, this document contains data and information regarding current utilization of renewable energy, renewable energy potential and development opportunities, target of renewable energy development and action plans necessary to achieve the targets.

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  15. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  16. Transit green building action plan : report to congress

    Science.gov (United States)

    2009-06-04

    The explanatory statement accompanying the fiscal year 2009 Omnibus appropriations : act1 directed the Federal Transit Administration (FTA) to submit a transit facility green : building action plan to the House and Senate Committees on Appropriati...

  17. Territorial Climate-Energy Plan - Le Mans region. Complete file + synthesis + Action sheets + Actor file + Appendices + Territory file

    International Nuclear Information System (INIS)

    Boulard, Jean-Claude

    2014-07-01

    A first document presents the meaning, objectives and implementation of the Territorial Climate Energy Plan (PCET) for Le Mans region, and then its five main steps: definition, diagnosis, actors, roadmap, assessment. A synthetic version is provided. Twenty action sheets are proposed, first in synthetic and general way, and then in terms of projects. These actions deal with transport and mobility, with building and development, with agriculture, forest and nature, with consumption and wastes, and with the mobilisation of actors. A document proposes sheets which describe good practices performed by Le Mans region 'syndicat mixte', by the city of Le Mans and its metropolitan body. Appendices contain some organisational information

  18. The effectiveness of the Danish Organic Action Plan 2020 to increase the level of organic public procurement in Danish public kitchens

    DEFF Research Database (Denmark)

    Sørensen, Nina Nørgaard; Tetens, Inge; Løje, Hanne

    2016-01-01

    and after kitchen employees participated in conversion projects. Public kitchens participating in the nine organic food conversion projects under the Danish Organic Action Plan 2020, initiated during autumn 2012 and spring 2013 and completed in summer 2015. A total of 622 public kitchens. The average...... (median) increase in organic food percentage from baseline to follow-up was 24 percentage points (Pincrease remained significant for seven out of eight kitchens. Furthermore......’, ‘menu planning’, ‘network’ and ‘Organic Cuisine Label method’ to ensure successful implementation. The study reports significant increases in the level of organic food procurement among public kitchens participating in the Danish Organic Action Plan 2020. Recommendations for future organic conversion...

  19. Priority actions of the different Regional Prevention Plans: common features and innovations

    Directory of Open Access Journals (Sweden)

    Francesca Russo

    2013-06-01

    Full Text Available The National Prevention Plan (NPP 2010-2012, approved by the Agreement between the Government, the Regions and Autonomous Provinces of Trento and Bolzano on 29 April 2010, called for Regions to adopt, by 31/12/2010, the Regional Prevention Plan (RPP for implementing the interventions provided by the NPP 2010-2012.This article has considered and compared the different RPP’s. In an attempt to provide an outlook on the future medical prevention plans over the next few years in Italy, a comparison has been made between the RPP from 19 Regions and the Autonomous Province of Trento. This work has been focused on the actions identified in regional plans as a priority concerning the major common and innovative elements.The analysis of each RPP revealed a common plan to chronic degenerative diseases, because of the aging of the population in every Region of Italy. Other important common targets are: surveillance systems, vaccination programs and screening programs. Toscana and Liguria, more than other Regions, are engaged in the creation of networks involving various social actors. In some Regions there are projects aimed at eliminating social, economic or gender inequities, such as the project “women’s health” in the Region of Puglia. Toscana and Emilia-Romagna Plans pay attention to environment and pollution issues.Despite social, environmental and economic differences, the various Regions have common principles, concerning: life style, surveillance, vaccination and the screening for cancer.

  20. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories for the AVAQMD and SJVUAPCD. We are approving these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  1. 76 FR 67366 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-01

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) emissions from industrial, institutional and commercial boilers, stationary internal combustion engines and water heaters. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  2. 76 FR 39303 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  3. NRC action plan developed as a result of the TMI-2 accident. Volume 2

    International Nuclear Information System (INIS)

    1980-05-01

    The Action Plan provides a comprehensive and integrated plan for all actions judged necessary by the Nuclear Regulatory Commission to correct or improve the regulation and operation of nuclear facilities based on the experience from the accident at the Three Mile Island, Unit 2, nuclear facility and the official studies and investigations of the accident. The tables included in this volume list the recommendations from the various organizations and task forces investigating the accident at Three Mile Island. The tables are annotated to provide easy references to the associated parts of the Action Plan in Volume 1. The tables are also annotated to provide a shorthand indication of how the various recommendations are treated in the Action Plan

  4. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within 90...

  5. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  6. Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation.

    Science.gov (United States)

    Laguna, Mariola; Purc, Ewelina

    2016-01-01

    The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans' formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.

  7. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  8. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  9. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  10. Strategic planning and action on climate change: A guide for Canadian mining companies

    International Nuclear Information System (INIS)

    2000-01-01

    This Guide has been developed by the Pembina Institute for Appropriate Development of Drayton Valley, Alberta and Stratos Inc., of Ottawa, as a project for the Mining Association of Canada, in an effort to assist senior executives in the Canadian mining industry in developing corporate strategic responses to the risks and opportunities associated with climate change and sustainable development. Section One of the Guide provides an introduction to the scientific, political and legal issues involved in climate change. Section Two outlines the implications of this issue for Canadian mining companies. Section Three and Four provide senior managers with a strategic framework to help understand the scope of a comprehensive response and assist them in developing and integrating climate change policies into their overall corporate strategy and business plan. Section Five outlines the major components of a generic climate change strategy and action plan, while Section Six looks at specific technical opportunity areas where mining companies can reduce greenhouse gas emissions. Section Seven focuses on business opportunities related to greenhouse gas emission reductions that can be implemented domestically or internationally outside of Canadian mining operations. Section Eight concludes the Guide with a comprehensive list of references and additional sources of information to assist users in follow-up and implementation. The accompanying companion handbook, entitled 'Guide to inventorying, measuring and reporting on climate change actions for MAC member companies' is designed to be used by energy managers and technical support staff who are responsible for implementing greenhouse gas measurement reporting systems. In addition to the Guide, the Mining Association and the Pembina Institute also developed three versions of a climate change strategy workshop designed for mining company personnel at different levels and different responsibilities. These workshops can also be

  11. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  12. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  13. Reducing greenhouse gas emissions: Lessons from state climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Pollak, Melisa, E-mail: mpollak@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States); Meyer, Bryn, E-mail: meye1058@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States); Wilson, Elizabeth, E-mail: ewilson@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States)

    2011-09-15

    We examine how state-level factors affect greenhouse gas (GHG) reduction policy preference across the United States by analyzing climate action plans (CAPs) developed in 11 states and surveying the CAP advisory group members. This research offers insights into how states approach the problem of choosing emissions-abatement options that maximize benefits and minimize costs, given their unique circumstances and the constellation of interest groups with power to influence state policy. The state CAPs recommended ten popular GHG reduction strategies to accomplish approximately 90% of emissions reductions, but they recommended these popular strategies in different proportions: a strategy that is heavily relied on in one state's overall portfolio may play a negligible role in another state. This suggests that any national policy to limit GHG emissions should encompass these key strategies, but with flexibility to allow states to balance their implementation for the state's unique geographic, economic, and political circumstances. Survey results strongly support the conclusion that decisions regarding GHG reductions are influenced by the mix of actors at the table. Risk perception is associated with job type for all strategies, and physical and/or geographic factors may underlie the varying reliance on certain GHG reduction strategies across states. - Highlights: > This study analyzed climate action plans from 12 states and surveyed the advisory group members. > Ten strategies supply 90% of recommended emission reductions, but states weigh them differently. > Advisory group members perceived different opportunities and risks in the top-ten strategies. > Both geographic and socio-political factors may underlie the varying reliance on certain strategies. > Cost, business practices and consumer behavior were ranked as the top barriers to reducing emissions.

  14. Reducing greenhouse gas emissions: Lessons from state climate action plans

    International Nuclear Information System (INIS)

    Pollak, Melisa; Meyer, Bryn; Wilson, Elizabeth

    2011-01-01

    We examine how state-level factors affect greenhouse gas (GHG) reduction policy preference across the United States by analyzing climate action plans (CAPs) developed in 11 states and surveying the CAP advisory group members. This research offers insights into how states approach the problem of choosing emissions-abatement options that maximize benefits and minimize costs, given their unique circumstances and the constellation of interest groups with power to influence state policy. The state CAPs recommended ten popular GHG reduction strategies to accomplish approximately 90% of emissions reductions, but they recommended these popular strategies in different proportions: a strategy that is heavily relied on in one state's overall portfolio may play a negligible role in another state. This suggests that any national policy to limit GHG emissions should encompass these key strategies, but with flexibility to allow states to balance their implementation for the state's unique geographic, economic, and political circumstances. Survey results strongly support the conclusion that decisions regarding GHG reductions are influenced by the mix of actors at the table. Risk perception is associated with job type for all strategies, and physical and/or geographic factors may underlie the varying reliance on certain GHG reduction strategies across states. - Highlights: → This study analyzed climate action plans from 12 states and surveyed the advisory group members. → Ten strategies supply 90% of recommended emission reductions, but states weigh them differently. → Advisory group members perceived different opportunities and risks in the top-ten strategies. → Both geographic and socio-political factors may underlie the varying reliance on certain strategies. → Cost, business practices and consumer behavior were ranked as the top barriers to reducing emissions.

  15. 77 FR 73322 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ...EPA is taking direct final action to approve revisions to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbines. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act).

  16. Education issues in disaster medicine: summary and action plan.

    Science.gov (United States)

    Armour, S J; Bastone, P; Birnbaum, M; Garrett, C; Greenough, P G; Manni, C; Ninomiya, N; Renderos, J; Rottman, S; Sahni, P; Shih, C L; Siegel, D; Younggren, B

    2001-01-01

    Change must begin with education. Theme 8 explored issues that need attention in Disaster Medicine education. Details of the methods used are provided in the introductory paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The chairs then presided over a workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) formal education, (2) standardized definitions, (3) integration, (4) evaluation of programs and interventions, (5) international cooperation, (6) identifying the psychosocial consequences of disaster, (7) meaningful research, and (8) hazard, impact, risk and vulnerability analysis. Three main components of the action plans were identified as evaluation, research, and education. The action plans recommended that: (1) education on disasters should be formalized, (2) evaluation of education and interventions must be improved, and (3) meaningful research should be promulgated and published for use at multiple levels and that applied research techniques be the subject of future conferences. The one unanimous conclusion was that we need more and better education on the disaster phenomenon, both in its impacts and in our response to them. Such education must be increasingly evidence-based.

  17. Systematic implementation of evidence-based practice in a clinical nursing setting: a participatory action research project.

    Science.gov (United States)

    Friesen-Storms, Jolanda H H M; Moser, Albine; van der Loo, Sandra; Beurskens, Anna J H M; Bours, Gerrie J J W

    2015-01-01

    To describe the process of implementing evidence-based practice in a clinical nursing setting. Evidence-based practice has become a major issue in nursing, it is insufficiently integrated into daily practice and its implementation is complex. Participatory action research. The main participants were nurses working in a lung unit of a rural hospital. A multi-method process of data collection was used during the observing, reflecting, planning and acting phases. Data were continuously gathered during a 24-month period from 2010 to 2012, and analysed using an interpretive constant comparative approach. Patients were consulted to incorporate their perspective. A best-practice mode of working was prevalent on the ward. The main barriers to the implementation of evidence-based practice were that nurses had little knowledge of evidence-based practice and a rather negative attitude towards it, and that their English reading proficiency was poor. The main facilitators were that nurses wanted to deliver high-quality care and were enthusiastic and open to innovation. Implementation strategies included a tailored interactive outreach training and the development and implementation of an evidence-based discharge protocol. The academic model of evidence-based practice was adapted. Nurses worked according to the evidence-based practice discharge protocol but barely recorded their activities. Nurses favourably evaluated the participatory action research process. Action research provides an opportunity to empower nurses and to tailor evidence-based practice to the practice context. Applying and implementing evidence-based practice is difficult for front-line nurses with limited evidence-based practice competencies. Adaptation of the academic model of evidence-based practice to a more pragmatic approach seems necessary to introduce evidence-based practice into clinical practice. The use of scientific evidence can be facilitated by using pre-appraised evidence. For clinical practice

  18. Thoughts on implementation of the recommendations of the GBIF Task Group on a Global Strategy and Action Plan for Mobilisation of Natural History Collections Data

    Directory of Open Access Journals (Sweden)

    Nicholas King

    2010-10-01

    Full Text Available The Global Biodiversity Information Facility (GBIF has a mandate to facilitate free and open access to primary biodiversity data worldwide. This Special Issue of Biodiversity Informatics publishes the findings of the recent GBIF Task Group on a Global Strategy and Action Plan for Mobilisation of Natural History Collections Data (GSAP-NHC. The GSAP-NHC Task Group has made three primary recommendations dealing with discovery, capture, and publishing of natural history collections data. This overview article provides insight on various activities initiated by GBIF to date to assist with an early uptake and implementation of these recommendations. It calls for proactive participation by all relevant players and stakeholder communities. Given recent technological progress and growing recognition and attention to biodiversity science worldwide, we think rapid progress in discovery, publishing and access to large volumes of useful collection data can be achieved for the immediate benefit of science and society.

  19. Westcoast Energy Inc. VCR action plan

    International Nuclear Information System (INIS)

    1998-01-01

    Westcoast Energy Inc. comprises a group of 14 major natural gas and petroleum companies from Canada and the United States. Climate change is a key strategic issue for the group. This paper represents their first consolidated Voluntary Challenge and Registry (VCR) action plan and includes updated information for the seven Westcoast companies which have previously filed individual action plans with the VCR office. Westcoast is involved in gathering and distribution of natural gas to more than one million consumers in Canada, and strongly supports a voluntary approach to meet Canada's commitment to reduce greenhouse gas emissions. Westcoast believes that market-based measures are the most effective and least-expensive way of addressing climate change issues. Key actions undertaken by Westcoast in 1996 were: (1) the creation of a climate change employee awareness program, (2) the development of greenhouse gas emissions inventories, (3) the use of new technologies and methods to reduce greenhouse gas emissions, (4) the development and use of end-user energy efficiency programs, and (5) support for research and pilot scale projects aimed at market-based approaches. In 1996, Westcoast emission from operational sources were 8,201 kt CO 2 equivalent. Emissions from operational sources represent an increase of 42 per cent over 1990 emissions. The main reason for these higher emissions is the increased market demand for natural gas which has resulted in the expansion of Westcoast operations. The demand for natural gas is expected to remain high because natural gas offers low carbon intensity compared to other fossil fuels. Future actions to reduce greenhouse gas emissions include gas storage in abandoned pipelines, a corporation-wide greenhouse gas emission reduction workshop, use of dry low NO x turbine combustion technology, advanced pipeline technology, acid gas reinjection, improvements in data tracking and capture, co-generation, recovery of landfill methane, and support

  20. Land Use Control Implementation Plan

    Science.gov (United States)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  1. Transierra social action plan; Plano de acao social de Transierra: responsabilidade social e satisfacao comunitaria

    Energy Technology Data Exchange (ETDEWEB)

    Chavez Alba, Rafael [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The design and the execution of the social - environmental compensation's plan of Transierra, or Plan of Social Action (PAS), are based on the implementation of programs and projects with 8 organizations belonging to 2 Indigenous Villages and with 6 Municipal Governments, for which jurisdictions crosses the Gas pipeline Yacuiba Rio Grande (GASYRG). The PAS is allowing the company to support tight links of good vicinity, and at the same time that is generating local employment and public and private concurrent investments, contributing this way to the sustainable development and to the improvement of the quality of life of the region and the country. Transierra's PAS is implemented by the principal social actors of the influence area who have institutional, legal and social - politics responsibilities with the development of more than 30.000 families, the same ones that have expressed a high degree of satisfaction for being beneficiaries of more than 600 projects of health, education, culture, basic sanitation, infrastructure and productive development. The present work tries to summarize the current advances and the results of the implementation of the PAS, as well as to demonstrate that the levels of satisfaction of the beneficiaries are happily coincidental with the institutional intentions of Social Corporate Responsibility. (author)

  2. Transierra social action plan; Plano de acao social de Transierra: responsabilidade social e satisfacao comunitaria

    Energy Technology Data Exchange (ETDEWEB)

    Chavez Alba, Rafael [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The design and the execution of the social - environmental compensation's plan of Transierra, or Plan of Social Action (PAS), are based on the implementation of programs and projects with 8 organizations belonging to 2 Indigenous Villages and with 6 Municipal Governments, for which jurisdictions crosses the Gas pipeline Yacuiba Rio Grande (GASYRG). The PAS is allowing the company to support tight links of good vicinity, and at the same time that is generating local employment and public and private concurrent investments, contributing this way to the sustainable development and to the improvement of the quality of life of the region and the country. Transierra's PAS is implemented by the principal social actors of the influence area who have institutional, legal and social - politics responsibilities with the development of more than 30.000 families, the same ones that have expressed a high degree of satisfaction for being beneficiaries of more than 600 projects of health, education, culture, basic sanitation, infrastructure and productive development. The present work tries to summarize the current advances and the results of the implementation of the PAS, as well as to demonstrate that the levels of satisfaction of the beneficiaries are happily coincidental with the institutional intentions of Social Corporate Responsibility. (author)

  3. Affirmative Action in Higher Education: A Sourcebook.

    Science.gov (United States)

    VanderWaerdt, Lois

    A comprehensive guide to the implementation of affirmative action in colleges and universities is presented. Information is provided on the preparation of an affirmative action plan subject to review by the federal Office of Contract Compliance. Attention is directed to qualifications for staffing affirmative action offices; procedures for hiring…

  4. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  5. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from coatings and strippers used on wood products, wood paneling, and miscellaneous metal parts and products. We are approving these local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  6. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  7. Developing a vision and strategic action plan for future community-based residency training.

    Science.gov (United States)

    Skelton, Jann B; Owen, James A

    2016-01-01

    The Community Pharmacy Residency Program (CPRP) Planning Committee convened to develop a vision and a strategic action plan for the advancement of community pharmacy residency training. Aligned with the profession's efforts to achieve provider status and expand access to care, the Future Vision and Action Plan for Community-based Residency Training will provide guidance, direction, and a strategic action plan for community-based residency training to ensure that the future needs of community-based pharmacist practitioners are met. National thought leaders, selected because of their leadership in pharmacy practice, academia, and residency training, served on the planning committee. The committee conducted a series of conference calls and an in-person strategic planning meeting held on January 13-14, 2015. Outcomes from the discussions were supplemented with related information from the literature. Results of a survey of CPRP directors and preceptors also informed the planning process. The vision and strategic action plan for community-based residency training is intended to advance training to meet the emerging needs of patients in communities that are served by the pharmacy profession. The group anticipated the advanced skills required of pharmacists serving as community-based pharmacist practitioners and the likely education, training and competencies required by future residency graduates in order to deliver these services. The vision reflects a transformation of community residency training, from CPRPs to community-based residency training, and embodies the concept that residency training should be primarily focused on training the individual pharmacist practitioner based on the needs of patients served within the community, and not on the physical location where pharmacy services are provided. The development of a vision statement, core values statements, and strategic action plan will provide support, guidance, and direction to the profession of pharmacy to

  8. Draft IAEA Action Plan on Nuclear Safety. Report by the Director General

    International Nuclear Information System (INIS)

    Amano, Y.

    2011-01-01

    In accordance with paragraphs 23 and 24 of the Declaration adopted by the Ministerial Conference on Nuclear Safety held on 20-24 June 2011, the Director General was requested to prepare and present to the Board of Governors and the General Conference at their September 2011 meetings a report on the Ministerial Conference and a draft Action Plan, building on the Ministerial Declaration, the conclusions and recommendations of the working sessions of the Ministerial Conference and the expertise and knowledge available therein, and to facilitate consultations among Member States on the draft Action Plan. This draft Action Plan is the result of an extensive process of consultations with Member States and responds to the request contained in the Ministerial Declaration.

  9. Collaborative action research: implementation of cooperative learning.

    Science.gov (United States)

    Smith-Stoner, Marilyn; Molle, Mary E

    2010-06-01

    Nurse educators must continually improve their teaching skills through innovation. However, research about the process used by faculty members to transform their teaching methods is limited. This collaborative study uses classroom action research to describe, analyze, and address problems encountered in implementing cooperative learning in two undergraduate nursing courses. After four rounds of action and reflection, the following themes emerged: students did not understand the need for structured cooperative learning; classroom structure and seating arrangement influenced the effectiveness of activities; highly structured activities engaged the students; and short, targeted activities that involved novel content were most effective. These findings indicate that designing specific activities to prepare students for class is critical to cooperative learning. Copyright 2010, SLACK Incorporated.

  10. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  11. City-Level Energy Decision Making. Data Use in Energy Planning, Implementation, and Evaluation in U.S. Cities

    Energy Technology Data Exchange (ETDEWEB)

    Aznar, Alexandra [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Day, Megan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Doris, Elizabeth [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mathur, Shivani [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Donohoo-Vallett, Paul [U.S. Department of Energy, Washington, DC (United States)

    2015-07-08

    The Cities-LEAP technical report, City-Level Energy Decision Making: Data Use in Energy Planning, Implementation, and Evaluation in U.S. Cities, explores how a sample of cities incorporates data into making energy-related decisions. This report provides the foundation for forthcoming components of the Cities-LEAP project that will help cities improve energy decision making by mapping specific city energy or climate policies and actions to measurable impacts and results.

  12. Autonomously Implemented Versatile Path Planning for Mobile Robots Based on Cellular Automata and Ant Colony

    Directory of Open Access Journals (Sweden)

    Adel Akbarimajd

    2012-02-01

    Full Text Available A path planning method for mobile robots based on two dimensional cellular automata is proposed. The method can be applied for environments with both concave and convex obstacles. It is also appropriate for multi-robot problems as well as dynamic environments. In order to develop the planning method, environment of the robot is decomposed to a rectangular grid and the automata is defined with four states including Robot cell, Free cell, Goal cell and Obstacle cell. Evolution rules of automata are proposed in order to direct the robot toward its goal. CA based path planner method is afterwards modified by a colony technique to be applicable for concave obstacles. Then a layered architecture is proposed to autonomously implement the planning algorithm. The architecture employs an abstraction approach which makes the complexity manageable. An important feature of the architecture is internal artifacts that have some beliefs about the world. Most actions of the robot are planned and performed with respect to these artifacts.

  13. Corrective action plan for CAU No. 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Roller Coaster Sewage Lagoons and North Disposal Trench Corrective Action Unit (CAU) No. 404. The site is located on the Tonopah Test Range. CAU 404 consists of two Corrective Action Sites (CAS): the Roller Coaster Lagoons (CAS No TA-03-001-TA-RC) and the North Disposal Trench (CAS No TA-21-001-TA-RC). A site map of the lagoons and trench is provided. The Roller Coaster Sewage Lagoons are comprised of two unlined lagoons that received liquid sanitary waste in 1963 from the Operation Roller Coaster Man Camp and debris from subsequent construction and range cleanup activities. The North Disposal Trench was excavated in approximately 1963 and received solid waste and debris from the man camp and subsequent construction and range cleanup activities. A small hydrocarbon spill occurred during the 1995 Voluntary Corrective Action (VCA) activities in an area associated with the North Disposal Trench CAS.

  14. Corrective action plan for CAU No. 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range

    International Nuclear Information System (INIS)

    1997-07-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Roller Coaster Sewage Lagoons and North Disposal Trench Corrective Action Unit (CAU) No. 404. The site is located on the Tonopah Test Range. CAU 404 consists of two Corrective Action Sites (CAS): the Roller Coaster Lagoons (CAS No TA-03-001-TA-RC) and the North Disposal Trench (CAS No TA-21-001-TA-RC). A site map of the lagoons and trench is provided. The Roller Coaster Sewage Lagoons are comprised of two unlined lagoons that received liquid sanitary waste in 1963 from the Operation Roller Coaster Man Camp and debris from subsequent construction and range cleanup activities. The North Disposal Trench was excavated in approximately 1963 and received solid waste and debris from the man camp and subsequent construction and range cleanup activities. A small hydrocarbon spill occurred during the 1995 Voluntary Corrective Action (VCA) activities in an area associated with the North Disposal Trench CAS

  15. Gen IV Materials Handbook Implementation Plan

    International Nuclear Information System (INIS)

    Rittenhouse, P.; Ren, W.

    2005-01-01

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  16. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham and Sam Marutzky

    2011-07-01

    This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flat CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient information and process

  18. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  19. Risk-informed local action planning against flooding: lessons learnt and way forward for a case study in Spain

    Directory of Open Access Journals (Sweden)

    Castillo-Rodríguez J.T.

    2016-01-01

    Full Text Available After 29 years of the largest flood event in modern times (with the highest recorded rainfall rate at the Iberian Peninsula with 817 mm in 24 hours, the municipality of Oliva faces the challenge of mitigating flood risk through the development and implementation of a local action plan, in line with other existent and ongoing structural measures for flood risk reduction. Located 65 km from Valencia, on the South-Eastern coast of Spain, Oliva is affected by pluvial, river and coastal flooding and it is characterized by a complex and wide-ranging geography and high seasonal variation in population. A quantitative flood risk analysis has been performed to support the definition of flood risk management strategies. This paper shows how hazard, exposure and vulnerability analyses provide valuable information for the development of a local action plan against flooding, for example by identifying areas with highest societal and economic risk levels. It is concluded that flood risk management actions, such as flood warning and monitoring or evacuation, should not be applied homogenously at local scale, but instead actions should be adapted based on spatial clustering. Implications about the impact of education and training on flood risk reduction are also addressed and discusse

  20. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  1. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  2. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  3. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  4. Partnering With Community-Dwelling Individuals With Diabetes for Health Behavior Change Using Action Plans: An Innovation in Health Professionals Education and Practice.

    Science.gov (United States)

    Barry Hultquist, Teresa; Brown, Sara Goomis; Geske, Jenenne; Kaiser, Katherine Laux; Waibel-Rycek, Denise

    2015-11-01

    Health care practitioners support or hinder an individual's attempts to self-manage health behavior. Practitioners must understand an individual's health needs and goals to effectively partner for behavior change. Self-management support (SMS) promote efforts toward positive health behavior change. Practitioners need training to provide effective SMS, beginning with their formal education. The purpose of this educational practice project was to integrate an evidence-based intervention (SMS using action plans) into a nursing curriculum. Three sequential steps included (1) providing foundational SMS education, (2) SMS application with students' personal action plans, and (3) implementing SMS with community-dwelling individuals with diabetes. Students (n = 130) partnered with participants (n = 85), developing short- (n = 240) and long-term (n = 99) action plans during home visits. The average baseline Diabetes Empowerment Scale score measuring participant's perceived psychosocial diabetes management self-efficacy was 4.3 (1-5 scale, SD = 0.51, n = 83). Most common short-term actions related to physical activity (n = 100, 42%) and healthy eating (n = 61, 25%). Average participant confidence level was 7.7 (SD = 1.9, 0-10 scale). Short-term goal evaluation (n = 209) revealed 66% (n = 137) were met more than 50% of the time. Both participants (99%) and students (99%) expressed satisfaction with home visit and action plan experiences. This teaching-learning experience is replicable and applicable to any professional health care student. © 2015 Society for Public Health Education.

  5. Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A...Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A) DoD Component Air Force Responsible Office Program...APB) dated March 9, 2015 DCAPES Inc 2A 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments

  6. Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B...Information Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B) DoD Component Air Force Responsible Office...been established. DCAPES Inc 2B 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments (DCAPES) is

  7. The search conference as a method in planning community health promotion actions

    Directory of Open Access Journals (Sweden)

    Eva Magnus

    2016-08-01

    Full Text Available Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives.

  8. Representation and Integration: Combining Robot Control, High-Level Planning, and Action Learning

    DEFF Research Database (Denmark)

    Petrick, Ronald; Kraft, Dirk; Mourao, Kira

    We describe an approach to integrated robot control, high-level planning, and action effect learning that attempts to overcome the representational difficulties that exist between these diverse areas. Our approach combines ideas from robot vision, knowledgelevel planning, and connectionist machine......-level action specifications, suitable for planning, from a robot’s interactions with the world. We present a detailed overview of our approach and show how it supports the learning of certain aspects of a high-level lepresentation from low-level world state information....... learning, and focuses on the representational needs of these components.We also make use of a simple representational unit called an instantiated state transition fragment (ISTF) and a related structure called an object-action complex (OAC). The goal of this work is a general approach for inducing high...

  9. Remedial Action Plan for Expanded Bioventing System Facility 6454

    National Research Council Canada - National Science Library

    1996-01-01

    This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...

  10. 76 FR 60376 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  11. 78 FR 23677 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-04-22

    ...EPA is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on January 7, 2013 and concerns local rules that regulate inhalable particulate matter (PM) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  12. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  13. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  14. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  15. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  16. 76 FR 41424 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-07-14

    ... modeling requirement for this SIP call should allow for the use of the modeling protocol developed by Iowa... is making a finding that the Iowa State Implementation Plan (SIP) is substantially inadequate to... ) in Muscatine County, Iowa. The specific SIP deficiencies needing revision are described below. EPA is...

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: 15-19-02, Waste Burial Pit, 15-30-01, Surface Features at Borehole Sites, 15-64-01, Decontamination Area, 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  18. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national

  19. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  20. Optimized planning methodologies of ASON implementation

    Science.gov (United States)

    Zhou, Michael M.; Tamil, Lakshman S.

    2005-02-01

    Advanced network planning concerns effective network-resource allocation for dynamic and open business environment. Planning methodologies of ASON implementation based on qualitative analysis and mathematical modeling are presented in this paper. The methodology includes method of rationalizing technology and architecture, building network and nodal models, and developing dynamic programming for multi-period deployment. The multi-layered nodal architecture proposed here can accommodate various nodal configurations for a multi-plane optical network and the network modeling presented here computes the required network elements for optimizing resource allocation.

  1. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  2. Who formulates self-regulatory action plans regarding fruit consumption? An application of the big five personality theory.

    NARCIS (Netherlands)

    de Bruijn, G.-J.

    2013-01-01

    Objective: Action planning is regarded as an important correlate and predictor of health behaviour, but little is known about antecedents of action planning. Because personality constructs have been shown to moderate the effect of action planning interventions, the present study tested associations

  3. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  4. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    Science.gov (United States)

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  5. Strategic Action Plan for ERNWACA - 2007-2011 | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Strategic Action Plan for ERNWACA - 2007-2011. IDRC institutional support over the period 2003-2006 (project 102095) enabled the Educational Research Network for West and Central Africa (ERNWACA) to carry out research that made an important contribution to policy dialogue in the region. The work also allowed the ...

  6. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    International Nuclear Information System (INIS)

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures

  7. Documentation of a model action plan to deter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.; Kristo, M.J.; Niemeyer, S.; Dudder, G.B.

    2008-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)

  8. Lead State Implementation Plan (SIP) Checklist Guide

    Science.gov (United States)

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the lead air emissions standard.

  9. U.S. Department of Energy defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Jordan, E.A.

    1988-01-01

    The Program Implementation Plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  10. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    Science.gov (United States)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  11. Electronic audit and feedback intervention with action implementation toolbox to improve pain management in intensive care: protocol for a laboratory experiment and cluster randomised trial.

    Science.gov (United States)

    Gude, Wouter T; Roos-Blom, Marie-José; van der Veer, Sabine N; de Jonge, Evert; Peek, Niels; Dongelmans, Dave A; de Keizer, Nicolette F

    2017-05-25

    Audit and feedback is often used as a strategy to improve quality of care, however, its effects are variable and often marginal. In order to learn how to design and deliver effective feedback, we need to understand their mechanisms of action. This theory-informed study will investigate how electronic audit and feedback affects improvement intentions (i.e. information-intention gap), and whether an action implementation toolbox with suggested actions and materials helps translating those intentions into action (i.e. intention-behaviour gap). The study will be executed in Dutch intensive care units (ICUs) and will be focused on pain management. We will conduct a laboratory experiment with individual ICU professionals to assess the impact of feedback on their intentions to improve practice. Next, we will conduct a cluster randomised controlled trial with ICUs allocated to feedback without or feedback with action implementation toolbox group. Participants will not be told explicitly what aspect of the intervention is randomised; they will only be aware that there are two variations of providing feedback. ICUs are eligible for participation if they submit indicator data to the Dutch National Intensive Care Evaluation (NICE) quality registry and agree to allocate a quality improvement team that spends 4 h per month on the intervention. All participating ICUs will receive access to an online quality dashboard that provides two functionalities: gaining insight into clinical performance on pain management indicators and developing action plans. ICUs with access to the toolbox can develop their action plans guided by a list of potential barriers in the care process, associated suggested actions, and supporting materials to facilitate implementation of the actions. The primary outcome measure for the laboratory experiment is the proportion of improvement intentions set by participants that are consistent with recommendations based on peer comparisons; for the randomised

  12. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), we are approving local rules that define terms used in other air pollution regulation in these areas and approving a rule rescission that addresses Petroleum Coke Calcining Operations--Oxides of Sulfur.

  13. 75 FR 24406 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2010-05-05

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD), Sacramento Metropolitan Air Quality Management District (SMAQMD), San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD), and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from petroleum facilities, chemical plants, and facilities which use organic solvents. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  14. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-01-31

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Antelope Valley Air Quality Management District (AVAQMD), Ventura County Air Pollution Control District (VCAPCD) and Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from gasoline bulk plants, terminals and vehicle dispensing facilities. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  15. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  16. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  17. A Low Carbon Development Guide for Local Government Actions in China

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, Nina; Zhou, Nan; Price, Lynn; Ohshita, Stephanie

    2011-05-01

    Local level actions are crucial for achieving energy-saving and greenhouse gas emission reduction targets. Yet it is challenging to implement new policies and actions due to a lack of information, funding, and capacity. This is particularly the case in developing countries such as China. Even though national energy intensity and carbon intensity targets have been set, most local governments do not have the knowledge regarding actions to achieve the targets, the cost-effectiveness of policies, the possible impact of policies, or how to design and implement a climate action plan. This paper describes a guidebook that was developed to motivate and provide local governments in China with information to create an action plan to tackle climate change and increase energy efficiency. It provides a simple step-by-step description of how action plans can be established and essential elements to be included - from preparing a GHG emission inventory to implementation of the plan. The guidebook also provides a comprehensive list of successful policies and best practices found internationally and in China to encourage low carbon development in industry, buildings, transportation, electric power generation, agriculture and forestry. This paper also presents indicators that can be used to define low-carbon development, as well as to evaluate the effectiveness of actions taken at an aggregated (city) level, and at a sectoral or end use level. The guidebook can also be used for low carbon development by local governments in other developing countries.

  18. Smart Buildings: Business Case and Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  19. IAEA supports regional seas conventions and action plans

    International Nuclear Information System (INIS)

    2000-01-01

    The document informs about the 3rd Global Meeting of Regional Seas Conventions and Action Plans held in Monaco in November 2000 at the IAEA's Marine Environmental Laboratory (IAEA-MEL). The meeting assembled a number of marine environmental experts from several UN bodies to reinforce activities to protect the marine environment

  20. Tactical Action Plan: Powering the Energy Frontier (An Appendix to the Strategic Roadmap 2024)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-01-01

    The Tactical Action Plan identifies and describes the Western-wide tasks and activities, existing and new, needed to fully achieve the goals in Strategic Roadmap 2024. Each activity in the TAP chart is briefly described in this document and also linked to the Critical Pathway it supports. As the TAP is a list of specific strategies and actions susceptible to changing environments and needs, the TAP will be updated more frequently as Western progresses towards its goals. The TAP is organized into seven Strategic Target Areas that serve as Western’s priorities and areas of focus for the next two to three years. These Target Areas are: Power and Transmission Related Services; Energy Infrastructure; Partnership and Innovation; Asset Management; Safety and Security; Communication; and Human Capital Management and Organization Structure. Target Areas are also used to create the agency’s annual performance targets, which measure progress and implementation of the TAP, and the status of which will be reported regularly.