WorldWideScience

Sample records for working group initiative

  1. Cyberinfrastructure Initiatives of the Committee on Earth Observation Satellites (CEOS) Working Group on Information Systems and Services (WGISS)

    Science.gov (United States)

    McDonald, K. R.; Faundeen, J. L.; Petiteville, I.

    2005-12-01

    The Committee on Earth Observation Satellites (CEOS) was established in 1984 in response to a recommendation from the Economic Summit of Industrialized Nations Working Group on Growth, Technology, and Employment's Panel of Experts on Satellite Remote Sensing. CEOS participants are Members, who are national or international governmental organizations who operate civil spaceborne Earth observation satellites, and Associates who are governmental organizations with civil space programs in development or international scientific or governmental bodies who have an interest in and support CEOS objectives. The primary objective of CEOS is to optimize benefits of satellite Earth observations through cooperation of its participants in mission planning and in development of compatible data products, formats, services, applications and policies. To pursue its objectives, CEOS establishes working groups and associated subgroups that focus on relevant areas of interest. While the structure of CEOS has evolved over its lifetime, today there are three permanent working groups. One is the Working Group on Calibration and Validation that addresses sensor-specific calibration and validation and geophysical parameter validation. A second is the Working Group on Education, Training, and Capacity Building that facilitates activities that enhance international education and training in Earth observation techniques, data analysis, interpretation and applications, with a particular focus on developing countries. The third permanent working group is the Working Group on Information Systems and Services (WGISS). The purpose of WGISS is to promote collaboration in the development of the systems and services based on international standards that manage and supply the Earth observation data and information from participating agencies' missions. WGISS places great emphasis on the use of demonstration projects involving user groups to solve the critical interoperability issues associated with the

  2. The North Seas Countries' Offshore Grid Initiative. Initial Findings. Final Report. Working Group 1 - Grid Configuration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-15

    This report focuses on the tasks and results from Working Group 1 (WG1), grid configuration and integration, chaired jointly by representatives from Denmark and the Netherlands. The methodology, assumptions concerning generation portfolio, load situation, available technology and results are presented. This report presents the WG1 Offshore Grid Study that supports the North Seas Countries' Offshore Grid Initiative (NSCOGI) final report. The information contained in this report aims to evaluate the long-term development of an offshore grid structure in the North Seas by providing a view on how such a grid may possibly develop in the future, based on the assumptions made for this study. The report aims to compare and evaluate the possible advantages and disadvantages of the long term development of an optimised, integrated (or meshed) offshore grid in the North Seas by providing a view of how that possible grid might develop in the future against changes to the electricity energy requirements. To evaluate basic variants, different transmission design topologies (radial and meshed) were compared and analysed with respect to various aspects, such as cost/benefits, import and export levels and the systems' CO2 emissions.

  3. Working group report: heavy ion physics

    International Nuclear Information System (INIS)

    Alam, Jan-E; Chattopadhyay, S.; Assamagan, K.; Gavai, R.; Gupta, Sourendra; Mukherjee, S.; Ray, R.; Layek, B.; Srivastava, A.; Roy, Pradip K.

    2004-01-01

    The 8th workshop on high energy physics phenomenology (WHEPP-8) was held at the Indian Institute of Technology, Mumbai, India during January 5-16, 2004. One of the four working groups, group III was dedicated to QCD and heavy ion physics (HIC). The present manuscript gives a summary of the activities of group III during the workshop. The activities of group III were focused to understand the collective behaviours of the system formed after the collisions of two nuclei at ultra-relativistic energies from the interactions of the elementary degrees of freedom, i.e. quarks and gluons, governed by non-Abelian gauge theory, i.e. QCD. This was initiated by two plenary talks on experimental overview of heavy ion collisions and lattice QCD and several working group talks and discussions. (author)

  4. Summary of the NICHD-BPCA Pediatric Formulation Initiatives Workshop-Pediatric Biopharmaceutics Classification System (PBCS) Working Group

    Science.gov (United States)

    Abdel-Rahman, Susan; Amidon, Gordon L.; Kaul, Ajay; Lukacova, Viera; Vinks, Alexander A.; Knipp, Gregory

    2012-01-01

    The Biopharmaceutics Classification System (BCS) allows compounds to be classified based on their in vitro solubility and intestinal permeability. The BCS has found widespread use in the pharmaceutical community as an enabling guide for the rational selection of compounds, formulation for clinical advancement and generic biowaivers. The Pediatric Biopharmaceutics Classification System (PBCS) working group was convened to consider the possibility of developing an analogous pediatric based classification system. Since there are distinct developmental differences that can alter intestinal contents, volumes, permeability and potentially biorelevant solubilities at the different ages, the PBCS working group focused on identifying age specific issues that would need to be considered in establishing a flexible, yet rigorous PBCS. Objective To summarize the findings of the PBCS working group and provide insights into considerations required for the development of a pediatric based biopharmaceutics classification system. Methods Through several meetings conducted both at The Eunice Kennedy Shriver National Institute of Child Health, Human Development (NICHD)-US Pediatric Formulation Initiative (PFI) workshop (November 2011) and via teleconferences, the PBCS working group considered several high level questions that were raised to frame the classification system. In addition, the PBCS working group identified a number of knowledge gaps that would need to be addressed in order to develop a rigorous PBCS. Results It was determined that for a PBCS to be truly meaningful, it would need to be broken down into several different age groups that would account for developmental changes in intestinal permeability, luminal contents, and gastrointestinal transit. Several critical knowledge gaps where identified including: 1) a lack of fully understanding the ontogeny of drug metabolizing enzymes and transporters along the gastrointestinal (GI) tract, in the liver and in the kidney; 2

  5. NEANSC Working Group on international evaluation cooperation

    International Nuclear Information System (INIS)

    Larson, D.C.; Nordborg, C.; Dunford, C.L.

    1992-01-01

    In the last three years, several newly evaluated nuclear data libraries have been released. Japan completed JENDL-3 in late 1989, JEF-2/EFF-2 was completed by Europe in 1991, and ENDF/B-VI was completed by the US in 1989. With the support of the NEACRP and the NEANDC, (recently combined into the NEA Nuclear Science Committee NEANSC), a Working Group was formed in 1989 to promote cooperative activities among the evaluation groups in OECD countries. Technical activities of the Working Group are carried out by subgroups formed to carry out specific investigations. Seven subgroups are currently active, with four more initiated by the Working Group at its meeting in May 1991. Brief descriptions of current subgroup activities are given

  6. WORK GROUP DEVELOPMENT MODELS – THE EVOLUTION FROM SIMPLE GROUP TO EFFECTIVE TEAM

    Directory of Open Access Journals (Sweden)

    Raluca ZOLTAN

    2016-02-01

    Full Text Available Currently, work teams are increasingly studied by virtue of the advantages they have compared to the work groups. But a true team does not appear overnight but must complete several steps to overcome the initial stage of its existence as a group. The question that arises is at what point a simple group is turning into an effective team. Even though the development process of group into a team is not a linear process, the models found in the literature provides a rich framework for analyzing and identifying the features which group acquires over time till it become a team in the true sense of word. Thus, in this article we propose an analysis of the main models of group development in order to point out, even in a relative manner, the stage when the simple work group becomes an effective work team.

  7. Collecting School Counseling Group Work Data: Initiating Consensual Qualitative Research through Practitioner-Researcher Partnerships

    Science.gov (United States)

    Springer, Sarah I.; Land, Christy W.; Moss, Lauren J.; Cinotti, Daniel

    2018-01-01

    Group counseling interventions can be complex to assess and research. Over the years, The "Journal for Specialists in Group Work" ("JSGW") has highlighted many of these challenges and offered valued approaches to designing projects that promote the efficacy and meaningfulness of group work in various settings. Similarly, school…

  8. The North Seas Countries' Offshore Grid Initiative. Initial Findings. Final Report. Working Group 1 - Grid Configuration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-15

    This report focuses on the tasks and results from Working Group 1 (WG1), grid configuration and integration, chaired jointly by representatives from Denmark and the Netherlands. The methodology, assumptions concerning generation portfolio, load situation, available technology and results are presented. This report presents the WG1 Offshore Grid Study that supports the North Seas Countries' Offshore Grid Initiative (NSCOGI) final report. The information contained in this report aims to evaluate the long-term development of an offshore grid structure in the North Seas by providing a view on how such a grid may possibly develop in the future, based on the assumptions made for this study. The report aims to compare and evaluate the possible advantages and disadvantages of the long term development of an optimised, integrated (or meshed) offshore grid in the North Seas by providing a view of how that possible grid might develop in the future against changes to the electricity energy requirements. To evaluate basic variants, different transmission design topologies (radial and meshed) were compared and analysed with respect to various aspects, such as cost/benefits, import and export levels and the systems' CO2 emissions.

  9. Group Work

    Science.gov (United States)

    Wilson, Kristy J.; Brickman, Peggy; Brame, Cynthia J.

    2018-01-01

    Science, technology, engineering, and mathematics faculty are increasingly incorporating both formal and informal group work in their courses. Implementing group work can be improved by an understanding of the extensive body of educational research studies on this topic. This essay describes an online, evidence-based teaching guide published by…

  10. Enhanced evaluation data initiates a collaborative out-of-school time food sponsors work group.

    Science.gov (United States)

    Rifkin, Robin; Williams, Lauren A; Grode, Gabrielle M; Roberts-Johnson, Wendy-Anne

    2015-01-01

    Philadelphia's Healthy Kids, Healthy Communities Out-of-School Time (OST) Initiative led by the Health Promotion Council developed 10 Healthy Living Guidelines for Out-of-School Time Programs to support a healthy environment for Philadelphia youth in 200 OST programs. Health Promotion Council participated in an enhanced cross-site evaluation with the national Robert Wood Johnson Foundation evaluator during the final year of funding to learn more about food and nutrition in the OST setting, and to share data and engage the OST food providers. A plate waste study measured the quantity and nutrition composition of meals served to youth compared to food not eaten. Staff interviews measured program adherence to the Healthy Living Guidelines, along with other facets of the food environment in 7 Philadelphia OST programs. Online surveys were sent to OST programs. Food providers (sponsors) were interviewed using Appreciative Inquiry methodology to gain insight into systems, goals, and common interests. Aggregated plate waste data from 7 observations showed an average of 42% of the food uneaten after meal/snack consumption, and high sodium content of the meals. Twenty-nine staff at OST programs completed the online survey, and 3 food sponsors were interviewed. Recommendations to improve the food included increasing variety, offering more salads, fruits and vegetables, and culturally appropriate foods. Food sponsor interviews showed a variety of meal production, distribution, service and training systems, and an interest in working together. The food sponsors met to review the data and prioritized common goals. They continue to work together to improve systems and meals for food service. A food sponsors work group formed and continues as a result of sharing enhanced cross-site data about food in OST settings. Food sponsors continue to work together to improve systems and nutritional offerings for Philadelphia OST programs.

  11. Nuclear safety policy working group recommendations on nuclear propulsion safety for the space exploration initiative

    Science.gov (United States)

    Marshall, Albert C.; Lee, James H.; Mcculloch, William H.; Sawyer, J. Charles, Jr.; Bari, Robert A.; Cullingford, Hatice S.; Hardy, Alva C.; Niederauer, George F.; Remp, Kerry; Rice, John W.

    1993-01-01

    An interagency Nuclear Safety Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program. These recommendations, which are contained in this report, should facilitate the implementation of mission planning and conceptual design studies. The NSPWG has recommended a top-level policy to provide the guiding principles for the development and implementation of the SEI nuclear propulsion safety program. In addition, the NSPWG has reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. These recommendations should be useful for the development of the program's top-level requirements for safety functions (referred to as Safety Functional Requirements). The safety requirements and guidelines address the following topics: reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, safeguards, risk/reliability, operational safety, ground testing, and other considerations.

  12. Spent Fuel Working Group Report

    International Nuclear Information System (INIS)

    O'Toole, T.

    1993-11-01

    The Department of Energy is storing large amounts of spent nuclear fuel and other reactor irradiated nuclear materials (herein referred to as RINM). In the past, the Department reprocessed RINM to recover plutonium, tritium, and other isotopes. However, the Department has ceased or is phasing out reprocessing operations. As a consequence, Department facilities designed, constructed, and operated to store RINM for relatively short periods of time now store RINM, pending decisions on the disposition of these materials. The extended use of the facilities, combined with their known degradation and that of their stored materials, has led to uncertainties about safety. To ensure that extended storage is safe (i.e., that protection exists for workers, the public, and the environment), the conditions of these storage facilities had to be assessed. The compelling need for such an assessment led to the Secretary's initiative on spent fuel, which is the subject of this report. This report comprises three volumes: Volume I; Summary Results of the Spent Fuel Working Group Evaluation; Volume II, Working Group Assessment Team Reports and Protocol; Volume III; Operating Contractor Site Team Reports. This volume presents the overall results of the Working Group's Evaluation. The group assessed 66 facilities spread across 11 sites. It identified: (1) facilities that should be considered for priority attention. (2) programmatic issues to be considered in decision making about interim storage plans and (3) specific vulnerabilities for some of these facilities

  13. Waste Contaminants at Military Bases Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    The Waste Contaminants at Military Bases Working Group has screened six prospective demonstration projects for consideration by the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT). These projects include the Kirtland Air Force Base Demonstration Project, the March Air Force Base Demonstration Project, the McClellan Air Force Base Demonstration Project, the Williams Air Force Base Demonstration Project, and two demonstration projects under the Air Force Center for Environmental Excellence. A seventh project (Port Hueneme Naval Construction Battalion Center) was added to list of prospective demonstrations after the September 1993 Working Group Meeting. This demonstration project has not been screened by the working group. Two additional Air Force remediation programs are also under consideration and are described in Section 6 of this document. The following information on prospective demonstrations was collected by the Waste Contaminants at Military Bases Working Group to assist the DOIT Committee in making Phase 1 Demonstration Project recommendations. The remainder of this report is organized into seven sections: Work Group Charter's mission and vision; contamination problems, current technology limitations, and institutional and regulatory barriers to technology development and commercialization, and work force issues; screening process for initial Phase 1 demonstration technologies and sites; demonstration descriptions -- good matches;demonstration descriptions -- close matches; additional candidate demonstration projects; and next steps

  14. Group work as an incentive for learning – students’ experiences of group work

    Science.gov (United States)

    Hammar Chiriac, Eva

    2014-01-01

    Group work is used as a means for learning at all levels in educational systems. There is strong scientific support for the benefits of having students learning and working in groups. Nevertheless, studies about what occurs in groups during group work and which factors actually influence the students’ ability to learn is still lacking. Similarly, the question of why some group work is successful and other group work results in the opposite is still unsolved. The aim of this article is to add to the current level of knowledge and understandings regarding the essence behind successful group work in higher education. This research is focused on the students’ experiences of group work and learning in groups, which is an almost non-existing aspect of research on group work prior to the beginning of the 21st century. A primary aim is to give university students a voice in the matter by elucidating the students’ positive and negative points of view and how the students assess learning when working in groups. Furthermore, the students’ explanations of why some group work ends up being a positive experience resulting in successful learning, while in other cases, the result is the reverse, are of interest. Data were collected through a study-specific questionnaire, with multiple choice and open-ended questions. The questionnaires were distributed to students in different study programs at two universities in Sweden. The present result is based on a reanalysis and qualitative analysis formed a key part of the study. The results indicate that most of the students’ experiences involved group work that facilitated learning, especially in the area of academic knowledge. Three important prerequisites (learning, study-social function, and organization) for group work that served as an effective pedagogy and as an incentive for learning were identified and discussed. All three abstractions facilitate or hamper students’ learning, as well as impact their experiences with

  15. Group work as an incentive for learning – students’ experiences of group work

    Directory of Open Access Journals (Sweden)

    Eva eHammar Chiriac

    2014-06-01

    Full Text Available Group work is used as a means for learning at all levels in educational systems. There is strong scientific support for the benefits of having students learning and working in groups. Nevertheless, studies about what occurs in groups during group work and which factors actually influence the students’ ability to learn is still lacking. Likewise, the question of why some group work is successful and other work results in the opposite is still unsolved. The aim of this article is to add to the current level of knowledge and understandings regarding the essence behind successful group work in higher education. This research is focused on the students’ experiences of group work and learning in groups, which is an almost non-existing aspect of research on group work prior to the beginning of the 21st century. A primary aim is to give university students a voice in the matter by elucidating the students’ positive and negative points of view and how the students assess learning when working in groups. Furthermore, the students’ explanations of why some group work ends up being a positive experience resulting in successful learning, while in other cases, the result is the reverse, are of interest. Data were collected through a study-specific questionnaire, with multiple choice and open-ended questions. The questionnaires were distributed to students in different study programs at two universities in Sweden. The present result is based on a reanalysis and qualitative analysis formed a key part of the study. The results indicate that most of the students’ experiences involved group work that facilitated learning, especially in the area of academic knowledge. Three important prerequisites (learning, study-social function and organization for group work that served as an effective pedagogy and as an incentive for learning were identified and discussed. All three abstractions facilitate or hamper students’ learning, as well as impact their

  16. IAU Astronomy for Equity and Inclusion Working Group

    Science.gov (United States)

    Ortiz-Gil, A.; García, B.; WG3 of Commission C1 Division C of the IAU

    2017-03-01

    In this talk we present the aims, goals and activities that have been started by the working group on Astronomy for Equity and Inclusion. This working group is part of Commission 1 ''Astronomy Education and Development'' of Division C ''Education, Outreach and Heritage'' of the International Astronomical Union (IAU). The working group was born with the aim of developing new strategies and resources to promote the access to Astronomy, both at the profesional and outreach levels, for persons with special needs or for those who could be excluded because of race or sexual orientation (among other reasons). It is composed of astronomers affiliated with the IAU and other volunteers who work in astronomy, education and special needs, as well as partner organizations like the IAU Office of Astronomy for Development (OAD), Astronomers without Borders (AWB), the Galileo Teacher Training Program (GTTP) or Universe Awareness (UNAWE). To reach those goals we have started different initiatives which are outlined at the working group’s website, like a repository of resources or the creation of a document about good practices, and the establishment of a tight collaboration with the Working Group about Accessibility of the American Astronomical Society, which was formed recently too.

  17. Group Work Publication-1991.

    Science.gov (United States)

    Zimpfer, David G.

    1992-01-01

    Lists 21 new publications in group work, of which 9 are reviewed. Those discussed include publications on group counseling and psychotherapy, structured groups, support groups, psychodrama, and social group work. (Author/NB)

  18. Multicultural group work

    DEFF Research Database (Denmark)

    Hansen, Annette Skovsted

    2014-01-01

    Motivation for the activity I use this strategy for forming groups to ensure diverse/multicultural groups that combine a variety of different strengths and resources based on student's academic, disciplinary, linguistic, national, personal and work backgrounds.......Motivation for the activity I use this strategy for forming groups to ensure diverse/multicultural groups that combine a variety of different strengths and resources based on student's academic, disciplinary, linguistic, national, personal and work backgrounds....

  19. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 11: Lawrence Berkeley Laboratory working group assessment team report

    International Nuclear Information System (INIS)

    1994-09-01

    President Clinton has directed an Interagency Working Group to initiate a comprehensive review of long-term options for the disposition of surplus plutonium. As part of this initiative, Secretary of Energy, Hazel O'Leary, has directed that a Department of Energy project be initiated to develop options and recommendations for the safe storage of these materials in the interim. A step in the process is a plutonium vulnerability assessment of facilities throughout the Department. The Plutonium Vulnerability Working Group was formed to produce the Project and Assessment Plans, to manage the assessments and to produce a final report for the Secretary by September 30, 1994. The plans established the approach and methodology for the assessment. The Project Plan specifies a Working Group Assessment Team (WGAT) to examine each of the twelve DOE sites with significant holdings of plutonium. The Assessment Plan describes the methodology that the Site Assessment Team (SAT) used to report on the plutonium holdings for each specific site.This report provides results of the assessment of the Lawrence Berkeley Laboratory

  20. Content-Related Interactions in Self-initiated Study Groups

    Science.gov (United States)

    Christian, Karen; Talanquer, Vicente

    2012-09-01

    The central goal of the present exploratory study was to investigate the nature of the content-related interactions in study groups independently organized by college organic chemistry students. We were particularly interested in the identification of the different factors that affected the emergence of opportunities for students to co-construct understanding and engage in higher levels of cognitive processing. Our results are based on the analysis of in situ observations of 34 self-initiated study sessions involving over a 100 students in three academic semesters. The investigation revealed three major types of social regulation processes, teaching, tutoring, and co-construction in the observed study sessions. However, the extent to which students engaged in each of them varied widely from one session to another. This variability was mostly determined by the specific composition of the study groups and the nature of the study tasks in which they were engaged. Decisions about how to organize the study session, the relative content knowledge and conceptual understanding expressed by the participants, as well as the cognitive level of the problems that guided group work had a strong impact on the nature of student interactions. Nevertheless, group talk in the observed study groups was mostly focused on low-level cognitive processes. The results of our work provide insights on how to better support students' productive engagement in study groups.

  1. Recent activities of the ESARDA working group on NDA

    International Nuclear Information System (INIS)

    Harry, R.J.S.

    1983-01-01

    The European Safeguards Research and Development Association, ESARDA, has one of the largest coordinated safeguards and development programs in the world. There are several working groups for specific R and D activities. One of these is the ''ESARDA Working Group on Techniques and Standards for non-Destructive Analysis''. The NDA working group has initiated the international project of the preparation of uranium oxide certified reference materials for the gamma spectrometric determination of the enrichment, which are made in a collaboration with the US NBS and the European Communities' Central Bureau for Nuclear Measurements, CBNM, at Geel. The possibility of a similar type of reference material for Pu isotopic abundance measurements is investigated at CBNM, and the pilot samples may become available for intercomparisons. Safeguards acceptability and users manual have been considered carefully. The working group has undertaken an intercomparison on the determination of plutonium isotopic ratios by gamma spectrometry, using NBS-SRM's-946, -947 and 948. A new exercise on 0,5 gram samples of seven different isotopic compositions samples will be executed under the name PIDIE (Plutonium Isotopic Determination Intercomparison Exercise)

  2. Working Group 7 Summary

    Energy Technology Data Exchange (ETDEWEB)

    Nagaitsev S.; Berg J.

    2012-06-10

    The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

  3. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 6: Lawrence Livermore National Laboratory working group assessment team report

    International Nuclear Information System (INIS)

    1994-09-01

    President Clinton directed an Interagency Working Group to initiate a comprehensive review of long-term options for the disposition of surplus plutonium. As part of this initiative, Secretary of Energy Hazel O'Leary directed the Department of Energy to develop options and plans for the interim safe storage of these materials. One step in this direction is a plutonium vulnerability assessment of DOE facilities by a open-quotes Plutonium Vulnerability Working Group.close quotes In this effort, the working group developed a Project Plan and an Assessment Plan which basically laid out the approach and methodology for the assessments. The plans were issued on April 25, 1994. The Project Plan specifies a WGAT for each site with significant holdings of plutonium. Also, the plan requires that each site form a Site Assessment Team (SAT) to provide the self assessment for the project. Additionally, the working group was tasked with managing the assessments at each site, and providing the results in a final report for the Secretary by September 30, 1994

  4. Reading Balint group work through Lacan's theory of the four discourses.

    Science.gov (United States)

    Van Roy, Kaatje; Marché-Paillé, Anne; Geerardyn, Filip; Vanheule, Stijn

    2016-02-05

    In Balint groups, (para)medical professionals explore difficult interactions with patients by means of case presentations and discussions. As the process of Balint group work is not well understood, this article investigates Balint group meetings by making use of Lacan's theory of the four discourses. Five Balint group case presentations and their subsequent group discussion were studied, resulting in the observation of five crucial aspects of Balint group work. First, Balint group participants brought puzzlement to the group, which is indicative of the structural impossibility Lacan situates at the basis of all discourse (1). As for the group discussion, we emphasize 'hysterization' as a crucial process in Balint group work (2), the supporting role of the discourse of the analyst (3) and the centrality of discourse interactions (4). Finally, the potential transformation of the initial puzzlement is discussed (5). We conclude by putting forth the uniqueness of Balint group work as well as the potential usefulness of our analysis as a framework for Balint group leaders and professionals in charge of continuing medical education. © The Author(s) 2016.

  5. The Product Quality Research Institute (PQRI) Leachables and Extractables Working Group Initiatives for Parenteral and Ophthalmic Drug Product (PODP).

    Science.gov (United States)

    Paskiet, Diane; Jenke, Dennis; Ball, Douglas; Houston, Christopher; Norwood, Daniel L; Markovic, Ingrid

    2013-01-01

    The Product Quality Research Institute (PQRI) is a non-profit consortium of organizations working together to generate and share timely, relevant, and impactful information that advances drug product quality and development. The collaborative activities of PQRI participants have, in the case of orally inhaled and nasal drug products (OINDPs), resulted in comprehensive and widely-accepted recommendations for leachables assessments to help ensure patient safety with respect to this class of packaged drug products. These recommendations, which include scientifically justified safety thresholds for leachables, represent a significant milestone towards establishing standardized approaches for safety qualification of leachables in OINDP. To build on the success of the OINDP effort, PQRI's Parenteral and Ophthalmic Drug Products (PODP) Leachables and Extractables Working Group was formed to extrapolate the OINDP threshold concepts and best practice recommendations to other dosage forms with high concern for interaction with packaging/delivery systems. This article considers the general aspects of leachables and their safety assessment, introduces the PODP Work Plan and initial study Protocol, discusses the laboratory studies being conducted by the PODP Chemistry Team, outlines the strategy being developed by the PODP Toxicology Team for the safety qualification of PODP leachables, and considers the issues associated with application of the safety thresholds, particularly with respect to large-volume parenterals. Lastly, the unique leachables issues associated with biologics are described. The Product Quality Research Institute (PQRI) is a non-profit consortium involving industry organizations, academia, and regulatory agencies that together provide recommendations in support of regulatory guidance to advance drug product quality. The collaborative activities of the PQRI Orally Inhaled and Nasal Drug Products Leachables and Extractables Working Group resulted in a

  6. Working group on unbundling of electricity trade operations 2. A group report

    International Nuclear Information System (INIS)

    2000-09-01

    The current unbundling of operations in accounts has proved inadequate. No formula or model that could be made binding by provisions have been defined for unbundled accounts. In addition, unbundling can draw a distinct line between commercial activities and network operations, which have assumed various authoritative functions. Against this background, the need for clearer unbundling has become more marked. The working group suggests that the current provisions on unbundling of trade operations should be tightened and that the unbundling should be made clearer especially in terms of allocation of joint costs. For this, the necessary preparations by the authorities should be initiated urgently. At the same time, the working group proposes that network operations should be unbundled from other operations by incorporation or by unbundling them into a separate public utility. The smallest electric utilities should be exempted from the obligation of incorporating network operations. According to the working group, the lower limit could be fixed e.g. at 70 GWh a year. The working group also suggests that the licensees must own the electricity networks they operate. The licensees could not rent their networks from the mother company nor lease them from a financing company. The model proposed by the working group would redress the major problems connected with the supervision of the electricity market. The monopoly, i.e. the electricity network operations, under the supervision of the Electricity Market Authority could thus be unbundled. This would improve the functioning of the market and facilitate the supervision. However, the model would not abolish the tax concession of municipal public utilities in competitive trade operations, production and sale of electricity. The tax concession may affect the competitive situation on the electricity market. (orig.)

  7. Status of the new initiative task force work

    International Nuclear Information System (INIS)

    Sheffield, J.

    1992-01-01

    The proposal for a open-quotes New Initiatives Task Forceclose quotes emerged from discussions in the scientific community on how to proceed following the demise of the Burning Plasma Experiment (BPX). In particular, the action of the Secretary of Energy Advisory Board (SEAB), which made the following recommendation in 1991, prompted the initiative: open-quotes Concept exploration should begin to define a new experiment in the $500 million class for the purpose of scientific study of tokomak improvements (e.g., second stability, steady state, bootstrap current) that could suggest new operating modes for ITER and permit the design of more reactor-desirable follow-ons to ITER.close quotes A New Initiative Task force, was chartered by Princeton Plasma Physics Laboratory in October 1991 to provide oversight in the development of a new experimental initiative and to provide guidance to advocate groups in the following areas: programmatic mission and technical objectives, critical issues of physics, engineering, and technology, design criteria, costing, and modes of operation. The guidance was designed to be based on broad community involvement. In addition, the Task Force was asked to identify the preferred options which could proceed to the design stage. Three primary machine designs have emerged from the work of this group, and they are briefly described. 4 refs., 2 figs., 2 tabs

  8. Work relating to defect assessment undertaken by activity group 2 of the European Commission's working group on codes and standards. WGCS overview

    International Nuclear Information System (INIS)

    Townley, C.H.A.; Guinovart, J.

    1995-01-01

    For about twenty years, the Working Group on Codes and Standards has been an Advisory Group of the European Commission and three sub-groups AG1, AG2 and AG3, were formed to consider manufacture and inspection, structural mechanics and materials topics respectively. Representation on the Working Group and its sub-groups comes from designers, utilities and atomic energy agencies in those member States with active nuclear power programmes. There has also been a very valuable input from universities and research organisations in the countries concerned. The method of working is to identify topics on which there is a difference of opinion; projects are set up to review the up to date scientific and technological knowledge. The investigations are undertaken collaboratively by specialists from as many countries as can contribute and there is an obligation to reach conclusions which can be put to practical use by engineers. While the Working group and its sub-groups are not directly involved in the production of standards, there is a very important input to the pre-standardization process. The work produced by AG2 covered a wide range of subjects associated with structural integrity, mainly concerning the Fast Breeder Reactors. Since 1991 the Group has progressively set up Light Water Reactor programmes. Currently, most of efforts are devoted to Thermal Reactors with a minor extent to Fast Breeder Reactors. The present paper is mainly concerned with those aspects of the AG2 activities which have a bearing on defect assessment. Although work was initiated as part of the FBR programme, it must be remembered that the greater part of it can be extended to a wide range of high temperature plants. Concerning the LWR programmes, an overview on current selected studies is being provided in this paper. (authors). 23 refs

  9. Using evidence-based leadership initiatives to create a healthy nursing work environment.

    Science.gov (United States)

    Nayback-Beebe, Ann M; Forsythe, Tanya; Funari, Tamara; Mayfield, Marie; Thoms, William; Smith, Kimberly K; Bradstreet, Harry; Scott, Pamela

    2013-01-01

    In an effort to create a healthy nursing work environment in a military hospital Intermediate Care Unit (IMCU), a facility-level Evidence Based Practice working group composed of nursing.Stakeholders brainstormed and piloted several unit-level evidence-based leadership initiatives to improve the IMCU nursing work environment. These initiatives were guided by the American Association of Critical Care Nurses Standards for Establishing and Sustaining Healthy Work Environments which encompass: (1) skilled communication, (2) true collaboration, (3) effective decision making, (4) appropriate staffing, (5) meaningful recognition, and (6) authentic leadership. Interim findings suggest implementation of these six evidence-based, relationship-centered principals, when combined with IMCU nurses' clinical expertise, management experience, and personal values and preferences, improved staff morale, decreased staff absenteeism, promoted a healthy nursing work environment, and improved patient care.

  10. Group Work: How to Use Groups Effectively

    Science.gov (United States)

    Burke, Alison

    2011-01-01

    Many students cringe and groan when told that they will need to work in a group. However, group work has been found to be good for students and good for teachers. Employers want college graduates to have developed teamwork skills. Additionally, students who participate in collaborative learning get better grades, are more satisfied with their…

  11. Computational methods working group

    International Nuclear Information System (INIS)

    Gabriel, T.A.

    1997-09-01

    During the Cold Moderator Workshop several working groups were established including one to discuss calculational methods. The charge for this working group was to identify problems in theory, data, program execution, etc., and to suggest solutions considering both deterministic and stochastic methods including acceleration procedures.

  12. Inter-Division IV-V-IX / Working Group Historic Radio Astronomy

    NARCIS (Netherlands)

    Orchiston, Wayne; Kellermann, Kenneth I.; Davies, Rodney D.; Débarbat, Suzanne V.; Morimoto, Masaki; Slysh, Slava; Swarup, Govind; van Woerden, Hugo; Wall, Jasper V.; Wielebinski, Richard

    2009-01-01

    The Working Group was formed at the IAU XXV General Assembly in Sydney, 2003, as a joint initiative of Commissions 40 Radio Astronomy and Commission 41 History of Astronomy, in order to assemble a master list of surviving historically-significant radio telescopes and associated instrumentation found

  13. Chemical Safety Vulnerability Working Group report. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 3 consists of eleven appendices containing the following: Field verification reports for Idaho National Engineering Lab., Rocky Flats Plant, Brookhaven National Lab., Los Alamos National Lab., and Sandia National Laboratories (NM); Mini-visits to small DOE sites; Working Group meeting, June 7--8, 1994; Commendable practices; Related chemical safety initiatives at DOE; Regulatory framework and industry initiatives related to chemical safety; and Chemical inventory data from field self-evaluation reports.

  14. Chemical Safety Vulnerability Working Group report. Volume 3

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 3 consists of eleven appendices containing the following: Field verification reports for Idaho National Engineering Lab., Rocky Flats Plant, Brookhaven National Lab., Los Alamos National Lab., and Sandia National Laboratories (NM); Mini-visits to small DOE sites; Working Group meeting, June 7--8, 1994; Commendable practices; Related chemical safety initiatives at DOE; Regulatory framework and industry initiatives related to chemical safety; and Chemical inventory data from field self-evaluation reports

  15. Proposed minimum reporting standards for chemical analysis Chemical Analysis Working Group (CAWG) Metabolomics Standards Initiative (MSI)

    Science.gov (United States)

    Amberg, Alexander; Barrett, Dave; Beale, Michael H.; Beger, Richard; Daykin, Clare A.; Fan, Teresa W.-M.; Fiehn, Oliver; Goodacre, Royston; Griffin, Julian L.; Hankemeier, Thomas; Hardy, Nigel; Harnly, James; Higashi, Richard; Kopka, Joachim; Lane, Andrew N.; Lindon, John C.; Marriott, Philip; Nicholls, Andrew W.; Reily, Michael D.; Thaden, John J.; Viant, Mark R.

    2013-01-01

    There is a general consensus that supports the need for standardized reporting of metadata or information describing large-scale metabolomics and other functional genomics data sets. Reporting of standard metadata provides a biological and empirical context for the data, facilitates experimental replication, and enables the re-interrogation and comparison of data by others. Accordingly, the Metabolomics Standards Initiative is building a general consensus concerning the minimum reporting standards for metabolomics experiments of which the Chemical Analysis Working Group (CAWG) is a member of this community effort. This article proposes the minimum reporting standards related to the chemical analysis aspects of metabolomics experiments including: sample preparation, experimental analysis, quality control, metabolite identification, and data pre-processing. These minimum standards currently focus mostly upon mass spectrometry and nuclear magnetic resonance spectroscopy due to the popularity of these techniques in metabolomics. However, additional input concerning other techniques is welcomed and can be provided via the CAWG on-line discussion forum at http://msi-workgroups.sourceforge.net/ or http://Msi-workgroups-feedback@lists.sourceforge.net. Further, community input related to this document can also be provided via this electronic forum. PMID:24039616

  16. 77 FR 72296 - Public Meeting of the U.S.-Canada Regulatory Cooperation Council (RCC) Motor Vehicles Working Group

    Science.gov (United States)

    2012-12-05

    ... the initiatives identified in the Joint Action Plan, bilateral working groups led by senior officials... Plan, bilateral working groups led by senior officials from regulatory agencies have developed work... Vehicles Working Group AGENCY: National Highway Traffic Safety Administration (NHTSA), DOT. ACTION...

  17. The didactics of group work

    DEFF Research Database (Denmark)

    Christensen, Gerd

    2017-01-01

    The aim of this paper is to discuss aims and means of group work as a teaching and learning method. In Denmark, group work has been implemented at all levels of education since the 1970s from primary school to university but also in training sessions in organizations. The discussion in this paper...... will take its point of departure in pedagogical textbook introductions where group work is often presented as a means to learning social skills and co-workability. However, as most students and teachers know, this is not always the case. Observations of long-term group work show that this can be a tough...... experience for the students (Christensen 2013). Contrary to expectations, the group work seemed to foster anti-social behavior and development of selfish skills. The paper will therefore conclude by suggesting how the (often) laissez-faire group pedagogy, which is dominant in Denmark, could be improved...

  18. Group Work. Research Brief

    Science.gov (United States)

    Walker, Karen

    2010-01-01

    According to Johnson and Johnson, group work helps increase student retention and satisfaction, develops strong oral communication and social skills, as well as higher self-esteem (University of Minnesota, n.d.). Group work, when planned and implemented deliberately and thoughtfully helps students develop cognitive and leadership skills as well as…

  19. Drug Use and Sex Work Among At-risk Women: A Qualitative Study of Initial Factors.

    Science.gov (United States)

    Roshanfekr, Payam; Noori, Roya; Dejman, Masoumeh; Fathi Geshnigani, Zahra; Rafiey, Hassan

    2015-06-01

    In recent years, there has been an increasing interest in performing research on drug use and sex work among at-risk women. Although there is a well-documented literature of the initial reasons associated with drug use and sex work among women, there is, however, a paucity of information in this area in Iran. This study aimed to explore the initial reasons associated with drug use and sex work in a group of female treatment seekers, who presented health-related risk behaviors, in Tehran, Iran. This qualitative study enrolled a total of 65 at-risk women, from five women-specific drug clinics, who participated in the study in 2011. Individual in-depth interviews were conducted. Focus group interviews were conducted with 10 key informants. All interviews were audio-taped and thematically written. The recorded data were analyzed using ATLASti qualitative research software version 10. The median age of the sample was 34 years. In addition, 44.6% of subjects were opiate users, and 55.4% were users of opiates and methamphetamine. Sex work was the main source of income for almost half of the sample. The most frequently reported reasons, associated with initial drug use, were extrinsic motivations, including the drug-using family, friends or social networks. Intrinsic motivations, including curiosity and individual willingness to use drugs, were other initial reasons. The most frequently reported reasons, associated with initial sex work, included the need to purchase drugs and financial problems. The study findings demonstrated a number of reasons associated with initial drug use and sex work. The role of sex work in providing drugs necessitates education and prevention. Special treatment programs should be implemented to prevent sex work among at-risk women in Iran.

  20. Parton Distributions Working Group

    International Nuclear Information System (INIS)

    Barbaro, L. de; Keller, S. A.; Kuhlmann, S.; Schellman, H.; Tung, W.-K.

    2000-01-01

    This report summarizes the activities of the Parton Distributions Working Group of the QCD and Weak Boson Physics workshop held in preparation for Run II at the Fermilab Tevatron. The main focus of this working group was to investigate the different issues associated with the development of quantitative tools to estimate parton distribution functions uncertainties. In the conclusion, the authors introduce a Manifesto that describes an optimal method for reporting data

  1. Danish Report: Work Stream 3: Fokus Group Interviews

    DEFF Research Database (Denmark)

    Siim, Birte; Larsen, Jeppe Fuglsang; Meret, Susi

    2014-01-01

    on – not only at the national level but especially beyond and below the nation state – at the transnational and local levels. It shows that some of the groups, for example Sabaah, offering counselling to homosexual youths with a Muslim background, work mainly on the local municipality level in Copenhagen. Other...... initiatives to combat hate speech hate crimes. The mapping of voluntary movements/groups/organizations presents an overview of the diverse policies and strategies towards racism, discrimination and hates speech and hate behavior. It looks at the kind of activities, campaigns and demonstrations...... the organizations have been engaged in demonstrating the close collaborations and negotiations/networking between the democratic anti-bodies as well as the struggles between antibodies and groups practicing hate speech and hate behavior. This identified important gaps in our knowledge about what is going...

  2. Movement initiation in groups of feral horses

    NARCIS (Netherlands)

    Krueger, Konstanze; Flauger, Birgit; Farmer, Kate; Hemelrijk, Charlotte

    Herds of ungulates, flocks of birds, swarms of insects and schools of fish move in coordinated groups. Computer models show that only one or very few animals are needed to initiate and direct movement. To investigate initiation mechanisms further, we studied two ways in which movement can be

  3. Spent Fuel Working Group report on inventory and storage of the Department`s spent nuclear fuel and other reactor irradiated nuclear materials and their environmental, safety and health vulnerabilities. Volume 2, Working Group Assessment Team reports; Vulnerability development forms; Working group documents

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The Secretary of Energy`s memorandum of August 19, 1993, established an initiative for a Department-wide assessment of the vulnerabilities of stored spent nuclear fuel and other reactor irradiated nuclear materials. A Project Plan to accomplish this study was issued on September 20, 1993 by US Department of Energy, Office of Environment, Health and Safety (EH) which established responsibilities for personnel essential to the study. The DOE Spent Fuel Working Group, which was formed for this purpose and produced the Project Plan, will manage the assessment and produce a report for the Secretary by November 20, 1993. This report was prepared by the Working Group Assessment Team assigned to the Hanford Site facilities. Results contained in this report will be reviewed, along with similar reports from all other selected DOE storage sites, by a working group review panel which will assemble the final summary report to the Secretary on spent nuclear fuel storage inventory and vulnerability.

  4. The M/V Selendang Ayu commercial fisheries work group process

    International Nuclear Information System (INIS)

    DeCola, E.; Robertson, T.; Pearson, L.; Dietrick, L.; Folley, G.

    2006-01-01

    The process used to form and operate the Selendang Ayu Fisheries Work Group was discussed. The M/V Selendang Ayu ran aground and broke apart near Unalaska Island, Alaska in December 2004, causing immediate concern to nearby commercial fisheries and seafood processors. The work group, which was formed less than 2 weeks after the initial spill, was modeled after other Alaska work groups and consisted of experts in environmental health, fisheries biology and oceanography. Its task was to facilitate communication between fishery managers and spill responders to identify risk-reducing measures and to minimize impacts to fisheries in Alaska. In support of Alaska's zero tolerance policy toward any contamination of food processed in Alaska, the working group conducted water quality sampling in and around Unalaska Island from December 2004 though March 2005. Information was gathered regarding fishery opening and closing dates, geographic extent of fisheries, gear and vessel types, seawater circulation systems, fish processing operations, vessel transit routes and other considerations related to the potential exposure of vessels, gear or seafood to oil. This paper described the different pathways that commercial fish species may be exposed to spilled oil, along with the major fish species at risk. One small fishery closure was enacted. The working group was successful in ensuring that major commercial fisheries for snow crab, pollock, halibut and other species were successfully conducted during the spill, with all loads undergoing mandatory seafood inspections. Seafood products were not contaminated and market prices remained stable. 15 refs., 6 tabs., 4 figs

  5. Challenges Facing Group Work Online

    Science.gov (United States)

    Chang, Bo; Kang, Haijun

    2016-01-01

    Online group work can be complicated because of its asynchronous characteristics and lack of physical presence, and its requirements for skills in handling technology, human relationships, and content-related tasks. This study focuses on the administrative, logistical and relationship-related challenges in online group work. Challenges in areas…

  6. Group Work with Transgender Clients

    Science.gov (United States)

    Dickey, Lore M.; Loewy, Michael I.

    2010-01-01

    Drawing on the existing literature, the authors' research and clinical experiences, and the first author's personal journey as a member and leader of the transgender community, this article offers a brief history of group work with transgender clients followed by suggestions for group work with transgender clients from a social justice…

  7. Eunice Kennedy Shriver National Institute of Child Health and Human Development Pediatric Formulation Initiative: selected reports from working groups.

    Science.gov (United States)

    Giacoia, George P; Taylor-Zapata, Perdita; Mattison, Donald

    2008-11-01

    The Pediatric Formulation Initiative (PFI) is a project of the Eunice Kennedy Shriver National Institute of Child Health and Human Development (NICHD). The PFI was established to address the issue of the lack of appropriate formulations in children and to use this activity as a means to improve pediatric formulations, as mandated by the Best Pharmaceuticals for Children Act of 2002 and 2007. The PFI began in 2005 with the formation of 3 working groups-Scientific, Economics, and Taste and Flavor. These groups began the process of identifying issues, gathering needed information, and considering possible ways to overcome barriers to the development of pediatric drug formulations. The purpose of this supplement was to provide details of the working groups' activities through presentation of full-length articles. Also presented is an article that discusses the 2007 European Union (EU) regulation on medicinal products for pediatric use. Information for this article was gathered from the proceedings of a PFI workshop, sponsored by the NICHD, that was held in Bethesda, Maryland, on December 6 and 7, 2005, as well as postworkshop discussions of the different working groups. The increased awareness that the majority of medications used today have not been labeled for use in children, and have not been tested to define safety, efficacy, and appropriate dosing, has led to the passage of legislation in the United States and in the EU to create incentives to stimulate the testing of drugs in this special population. It is imperative that the problems associated with the compounding and use of extemporaneous formulations as described in this supplement be addressed. Regulatory barriers to the availability of commercially developed pediatric formulations in different countries will need to be minimized or removed. New drug delivery systems will need to be tested and made available to pediatric patients. Further research in the mediators of bitter taste and study of taste blockers

  8. Development Strategy of Microtakaful Institutions: Case Study Working Group Indonesia

    Directory of Open Access Journals (Sweden)

    Aam Slamet Rusydiana

    2017-07-01

    Full Text Available Indonesia is becoming one of potential countries in microtakaful institutions development. One of the expert in microtakaful is Takmin Working Group. TWG is a group of initiators who have commitment to develop micro takaful in Indonesia. Its members consist ofexperts in Islamic insurance, micro finance and accounting. The research objectives of this study are to identify and analyze the problems faced by TWG in developing of microtakaful institutions and identify the solutions to solve those kinds of problems, by using AnalticHierarchy Process (AHP method. The finding of this study shows the most priority solutions that can be undertake by Takmin Working Group to solve these both internal and external problem is information system development, and then followed by innovative product development. Communication & visitation to Islamic micro finance institutions and socialization about micro takaful product to society are being less priority on this matter.DOI: 10.15408/etk.v16i2.5267

  9. Designing Work, Family & Health Organizational Change Initiatives.

    Science.gov (United States)

    Kossek, Ellen Ernst; Hammer, Leslie B; Kelly, Erin L; Moen, Phyllis

    2014-01-01

    For decades, leaders and scholars have been advocating change efforts to improve work-life relationships. Yet most initiatives have lacked rigor and not been developed using scientific principles. This has created an evidence gap for employer support of work and personal life as a win-win for productivity and employees' well-being. This paper examines the approach used by the U.S. Work Family Health Network (WFRN) to develop an innovative workplace intervention to improve employee and family health. The change initiative was designed to reduce organizationally based work-family conflict in two contrasting contexts representative of major segments of today's U.S. workforce: health care employees and informational technology professionals. The WFRN Intervention (called STAR) had three theoretically based change elements. They were: 1) increase job control over work time and schedule; 2) increase supervisor social support for family and job effectiveness; and 3) improve organizational culture and job design processes to foster results orientation. Seven practical lessons for developing work-life interventions emerged from this groundbreaking endeavor.

  10. Proteomics Standards Initiative: Fifteen Years of Progress and Future Work.

    Science.gov (United States)

    Deutsch, Eric W; Orchard, Sandra; Binz, Pierre-Alain; Bittremieux, Wout; Eisenacher, Martin; Hermjakob, Henning; Kawano, Shin; Lam, Henry; Mayer, Gerhard; Menschaert, Gerben; Perez-Riverol, Yasset; Salek, Reza M; Tabb, David L; Tenzer, Stefan; Vizcaíno, Juan Antonio; Walzer, Mathias; Jones, Andrew R

    2017-12-01

    The Proteomics Standards Initiative (PSI) of the Human Proteome Organization (HUPO) has now been developing and promoting open community standards and software tools in the field of proteomics for 15 years. Under the guidance of the chair, cochairs, and other leadership positions, the PSI working groups are tasked with the development and maintenance of community standards via special workshops and ongoing work. Among the existing ratified standards, the PSI working groups continue to update PSI-MI XML, MITAB, mzML, mzIdentML, mzQuantML, mzTab, and the MIAPE (Minimum Information About a Proteomics Experiment) guidelines with the advance of new technologies and techniques. Furthermore, new standards are currently either in the final stages of completion (proBed and proBAM for proteogenomics results as well as PEFF) or in early stages of design (a spectral library standard format, a universal spectrum identifier, the qcML quality control format, and the Protein Expression Interface (PROXI) web services Application Programming Interface). In this work we review the current status of all of these aspects of the PSI, describe synergies with other efforts such as the ProteomeXchange Consortium, the Human Proteome Project, and the metabolomics community, and provide a look at future directions of the PSI.

  11. The Ombudperson Initiative Group

    CERN Multimedia

    Laura Stewart

    Following many discussions that took place at some of the ATLAS Women's Network lunch gatherings, a few ATLAS women joined forces with similarly concerned CERN staff women to form a small group last Fall to discuss the need for a CERN-wide Ombudsperson. This has since evolved into the Ombudsperson Initiative Group (OIG) currently composed of the following members: Barbro Asman, Stockholm University; Pierre Charrue, CERN AB; Anna Cook, CERN IT; Catherine Delamare, CERN and IT Ombudsperson; Paula Eerola, Lund University; Pauline Gagnon, Indiana University; Eugenia Hatziangeli, CERN AB; Doreen Klem, CERN IT; Bertrand Nicquevert, CERN TS and Laura Stewart, CERN AT. On June 12, members of the OIG met with representatives of Human Resources (HR) and the Equal Opportunity Advisory Panel (EOAP) to discuss the proposal drafted by the OIG. The meeting was very positive. Everybody agreed that the current procedures at CERN applicable in the event of conflict required a thorough review, and that a professionnally trai...

  12. Theoretical Issues in Clinical Social Group Work.

    Science.gov (United States)

    Randall, Elizabeth; Wodarski, John S.

    1989-01-01

    Reviews relevant issues in clinical social group practice including group versus individual treatment, group work advantages, approach rationale, group conditions for change, worker role in group, group composition, group practice technique and method, time as group work dimension, pretherapy training, group therapy precautions, and group work…

  13. Annual report of the Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusin Working Group (FWG))

    International Nuclear Information System (INIS)

    1987-04-01

    The Summit Members' Working Group on Controlled Thermonuclear Fusion [Fusion Working Group (FWG)] was established in 1983 in response to the Declaration of the Heads of State and Government at the Versailles Economic Summit meeting of 1982, and in response to the subsequent report of the Working Group in Technology, Growth and Employment (TGE) as endorsed at the Williamsburg Summit meeting, 1983. This document contains the complete written record of each of the three FWG meetings which include the minutes, lists of attendees, agendas, statements, and summary conclusions as well as the full reports of the Technical Working Party. In addition, there is a pertinent exchange of correspondence between FWG members on the role of the Technical Working Party and a requested background paper on the modalities associated with a possible future ETR project

  14. Group work is political work: a feminist perspective of interpersonal group psychotherapy.

    Science.gov (United States)

    Bender, A; Ewashen, C

    2000-01-01

    When practicing as group leaders, mental health nurses often incorporate Irvin Yalom's (1995, 1998) concepts of social microcosm and here-and-now. This article examines these concepts from a feminist perspective and offers an approach to group psychotherapy that processes gender issues and fosters collective consciousness-raising. A feminist perspective in group therapy challenges us to view the social microcosm as a reenactment of sociopolitical contexts and the here-and-now as a medium for developing personal and social responsibility. Therapy is not only about individual and interpersonal change in group members, but is an opportunity for healthy social change. Therapy becomes political work, raising the social consciousness of each participant as well as the group as a whole.

  15. Business working group

    International Nuclear Information System (INIS)

    Doroshuk, B.W.

    2000-01-01

    The workshop of 26-27 june 2000, on nuclear power Plant LIfe Management (PLIM), also included working groups in which major issues facing PLIM activities for nuclear power plants were identified and discussed. The third group was on Business. The discussion concerned the following points: There are concerns about retaining experienced/trained personnel, and maintaining a good working relationship among them, as well as about the closure of research facilities, the reduction in staff numbers under increasing economic pressure and the lack of new nuclear power plant constructions. The marginal cost of producing electricity is lower for most existing nuclear power plants than for almost all other energy sources. Refurbishment costs are usually relatively small compared with new investments. The ongoing regulatory reform of the electricity market will bring increasing competition. Although PLIM has been carried out in many countries with favourable results, there are still uncertainties which affect business decisions regarding financial and market risks in PLIM activities. Recommendations were made. (author)

  16. Post-Disaster Social Justice Group Work and Group Supervision

    Science.gov (United States)

    Bemak, Fred; Chung, Rita Chi-Ying

    2011-01-01

    This article discusses post-disaster group counseling and group supervision using a social justice orientation for working with post-disaster survivors from underserved populations. The Disaster Cross-Cultural Counseling model is a culturally responsive group counseling model that infuses social justice into post-disaster group counseling and…

  17. The Emissions-Free Energy (EFE) Working Group

    Energy Technology Data Exchange (ETDEWEB)

    Humphries, R., E-mail: Roger.Humphries@amec.com [AMEC NSS, Toronto, Ontario (Canada)

    2014-07-01

    There has been a growing international interest in smaller, simpler reactors for generating electricity and process heat. They incorporate modern technological advances in reactor design, reactor safety, modular construction, proliferation resistance, and risk reduction. The interest in these reactors has been driven by many factors, including the need to reduce greenhouse gas emissions and provide reliable power in 'off-grid' or 'edge-of-grid' locations. Licensing these new small reactors, particularly in Canada's resource rich remote northern regions, will raises issues in a wide variety of technical, institutional, socio-economic and regulatory policy areas. The first small reactor vendor to file a license application or to engage the CNSC in its pre-licensing vendor design review process is going to have to deal with these issues. However these issues affect the entire small reactor industry and it is essential that the industry as a whole address them. Accordingly, a small reactor industry-wide Working Group has been established to identify and prioritize the issues that need to be addressed and work with the CNSC and other interested stakeholders to agree on a resolution acceptable to all parties. The objective of the small reactor industry is to introduce an economical, emissions-free source of electrical and thermal energy. It is the opinion of the WG that our emphasis ought to be on the product rather than the technology, hence the name Emissions-Free Energy Working Group. The EFE WG has initiated contact with the CNSC and has started its review of CNSC draft regulatory and guidance documents. (author)

  18. Early sex work initiation and condom use among alcohol-using female sex workers in Mombasa, Kenya: a cross-sectional analysis.

    Science.gov (United States)

    Parcesepe, Angela M; L'Engle, Kelly L; Martin, Sandra L; Green, Sherri; Suchindran, Chirayath; Mwarogo, Peter

    2016-12-01

    Early initiation of sex work is prevalent among female sex workers (FSWs) worldwide. The objectives of this study were to investigate if early initiation of sex work was associated with: (1) consistent condom use, (2) condom negotiation self-efficacy or (3) condom use norms among alcohol-using FSWs in Mombasa, Kenya. In-person interviews were conducted with 816 FSWs in Mombasa, Kenya. Sample participants were: recruited from HIV prevention drop-in centres, 18 years or older and moderate risk drinkers. Early initiation was defined as first engaging in sex work at 17 years or younger. Logistic regression modelled outcomes as a function of early initiation, adjusting for drop-in centre, years in sex work, supporting others and HIV status. FSWs who initiated sex work early were significantly less likely to report consistent condom use with paying sex partners compared with those who initiated sex work in adulthood. There was no significant difference between groups in consistent condom use with non-paying sex partners. FSWs who initiated sex work early endorsed less condom negotiation self-efficacy with paying sex partners compared with FSWs who did not initiate sex work early. Findings highlight a need for early intervention for at-risk youth and adolescent FSWs, particularly in relation to HIV sexual risk behaviours. Evidence-based interventions for adolescent FSWs or adult FSWs who began sex work in adolescence should be developed, implemented and evaluated. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  19. A brief review of the work of the IUR soil-plant transfer working group, with suggestions for the way forward with ESNA

    International Nuclear Information System (INIS)

    Mitchell, N. G.

    1994-01-01

    The past activities of the International Union of Radioecologists' soil-plant transfer working group are described in terms of the initial objectives, the data that were accumulated in the period 1982 to 1992 and the subsequent use of these data. An option for future collaboration of a joint IUR/ESNA working group on the transfer of radionuclides to crop plants is then presented. This is presented as a basis for further discussion and comments on this proposal are welcomed. (author)

  20. CFCC working group meeting: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

  1. Development and initial validation of a cognitive-based work-nonwork conflict scale.

    Science.gov (United States)

    Ezzedeen, Souha R; Swiercz, Paul M

    2007-06-01

    Current research related to work and life outside work specifies three types of work-nonwork conflict: time, strain, and behavior-based. Overlooked in these models is a cognitive-based type of conflict whereby individuals experience work-nonwork conflict from cognitive preoccupation with work. Four studies on six different groups (N=549) were undertaken to develop and validate an initial measure of this construct. Structural equation modeling confirmed a two-factor, nine-item scale. Hypotheses regarding cognitive-based conflict's relationship with life satisfaction, work involvement, work-nonwork conflict, and work hours were supported. The relationship with knowledge work was partially supported in that only the cognitive dimension of cognitive-based conflict was related to extent of knowledge work. Hypotheses regarding cognitive-based conflict's relationship with family demands were rejected in that the cognitive dimension correlated positively rather than negatively with number of dependent children and perceived family demands. The study provides encouraging preliminary evidence of scale validity.

  2. Working with Difficult Group Members.

    Science.gov (United States)

    Kottler, Jeffrey A.

    1994-01-01

    Describes types of group members who are challenging in group settings including entitled, manipulative, and character-disordered clients. Provides suggestions for working with these group members, either as isolated cases or as homogenous populations, emphasizing the protection of other clients' rights. Includes 31 references. (Author/CRR)

  3. Division XII / Commission 41 / Working Group Historical Instruments

    Science.gov (United States)

    Pigatto, Luisa; Il-Seong, Nha; Hamel, Jürgen; Johnson, Kevin; Kochhar, Rajesh K.; Nakamura, Tsuko; Orchiston, Wayne; Pettersen, Bjørn R.; Schechner, Sara J.; Yunli, Shi

    The Historical Instruments Working Group (WG-HI) and Commission 41 started planning an interdisciplinary conference titled Astronomy and its instruments before and after Galileo since January 2007. This conference, as an IYA2009 initiative, aims “to highlight mankind's path toward an improved knowledge of the sky using mathematical and mechanical tools as well as monuments and buildings, giving rise, in doing so, to scientific astronomy”. Commission 46 and Commission 55 also support this conference, to be held on the Isle of San Servolo, Venice (Italy), 27 September 3 October 2009. As a fact of history, it was in Venice that Galileo was advised and got material (glass) to make his telescope, and in Venice he presented an working instrument to Venetian Doge in August 1609. The conference is co-sponsored by IAU as a Joint Symposium with the INAF Astronomical Observatory of Padova, Italy.

  4. Annual report of the Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusin Working Group (FWG))

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1987-04-01

    The Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusion Working Group (FWG)) was established in 1983 in response to the Declaration of the Heads of State and Government at the Versailles Economic Summit meeting of 1982, and in response to the subsequent report of the Working Group in Technology, Growth and Employment (TGE) as endorsed at the Williamsburg Summit meeting, 1983. This document contains the complete written record of each of the three FWG meetings which include the minutes, lists of attendees, agendas, statements, and summary conclusions as well as the full reports of the Technical Working Party. In addition, there is a pertinent exchange of correspondence between FWG members on the role of the Technical Working Party and a requested background paper on the modalities associated with a possible future ETR project.

  5. Summary of the National Institute of Child Health and Human Development-best pharmaceuticals for Children Act Pediatric Formulation Initiatives Workshop-Pediatric Biopharmaceutics Classification System Working Group.

    Science.gov (United States)

    Abdel-Rahman, Susan M; Amidon, Gordon L; Kaul, Ajay; Lukacova, Viera; Vinks, Alexander A; Knipp, Gregory T

    2012-11-01

    The Biopharmaceutics Classification System (BCS) allows compounds to be classified based on their in vitro solubility and intestinal permeability. The BCS has found widespread use in the pharmaceutical community to be an enabling guide for the rational selection of compounds, formulation for clinical advancement, and generic biowaivers. The Pediatric Biopharmaceutics Classification System (PBCS) Working Group was convened to consider the possibility of developing an analogous pediatric-based classification system. Because there are distinct developmental differences that can alter intestinal contents, volumes, permeability, and potentially biorelevant solubilities at different ages, the PBCS Working Group focused on identifying age-specific issues that need to be considered in establishing a flexible, yet rigorous PBCS. We summarized the findings of the PBCS Working Group and provided insights into considerations required for the development of a PBCS. Through several meetings conducted both at The Eunice Kennedy Shriver National Institute of Child Health, Human Development-US Pediatric Formulation Initiative Workshop (November 2011) and via teleconferences, the PBCS Working Group considered several high-level questions that were raised to frame the classification system. In addition, the PBCS Working Group identified a number of knowledge gaps that need to be addressed to develop a rigorous PBCS. It was determined that for a PBCS to be truly meaningful, it needs to be broken down into several different age groups that account for developmental changes in intestinal permeability, luminal contents, and gastrointestinal (GI) transit. Several critical knowledge gaps were identified, including (1) a lack of fully understanding the ontogeny of drug metabolizing enzymes and transporters along the GI tract, in the liver, and in the kidney; (2) an incomplete understanding of age-based changes in the GI, liver, and kidney physiology; (3) a clear need to better understand

  6. Social Maturation: Work Group Proceedings.

    Science.gov (United States)

    Resnick, Michael D.; And Others

    1985-01-01

    Each of the seven factors that affect adolescent social development is presented together with a description of potentially important research, service, and policy initiatives within each topic area. The factors are self-esteem, peer group, parenting, family, services, enforced dependency, and positive sexual socialization. (CT)

  7. Working group on unbundling of electricity trade operations 2. A group report; Saehkoeliiketoimintojen eriyttaemistyoeryhmae 2. Tyoeryhmaen mietintoe

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The current unbundling of operations in accounts has proved inadequate. No formula or model that could be made binding by provisions have been defined for unbundled accounts. In addition, unbundling can draw a distinct line between commercial activities and network operations, which have assumed various authoritative functions. Against this background, the need for clearer unbundling has become more marked. The working group suggests that the current provisions on unbundling of trade operations should be tightened and that the unbundling should be made clearer especially in terms of allocation of joint costs. For this, the necessary preparations by the authorities should be initiated urgently. At the same time, the working group proposes that network operations should be unbundled from other operations by incorporation or by unbundling them into a separate public utility. The smallest electric utilities should be exempted from the obligation of incorporating network operations. According to the working group, the lower limit could be fixed e.g. at 70 GWh a year. The working group also suggests that the licensees must own the electricity networks they operate. The licensees could not rent their networks from the mother company nor lease them from a financing company. The model proposed by the working group would redress the major problems connected with the supervision of the electricity market. The monopoly, i.e. the electricity network operations, under the supervision of the Electricity Market Authority could thus be unbundled. This would improve the functioning of the market and facilitate the supervision. However, the model would not abolish the tax concession of municipal public utilities in competitive trade operations, production and sale of electricity. The tax concession may affect the competitive situation on the electricity market. (orig.)

  8. ORGANIZATIONAL WORK GROUPS AND WORK TEAMS – APPROACHES AND DIFFERENCES

    Directory of Open Access Journals (Sweden)

    Raluca ZOLTAN

    2015-02-01

    Full Text Available Work groups and work teams represents basic structures of traditional and modern organizations, and during the time they have been intensively researched. However, managers often do not always consider the fundamental differences between groups and teams, which will lead to unrealistic goals and results below expectations. Thus, in the present paper we propose a review of the main researching approaches on groups and teams (psychosocial, socio-technical, and behavioral approach, in the third part of the paper being detailed the fundamental differences between groups and teams in the light of these approaches.

  9. PERSPECTIVES ON GROUP WORK IN DISTANCE LEARNING

    Directory of Open Access Journals (Sweden)

    Rune Sarromaa HAUSSTÄTTER

    2007-01-01

    Full Text Available Current distance education benefits greatly from educational software that makes group work possible for students who are separated in time and space. However, some students prefer distance education because they can work on their own. This paper explores how students react to expectations on behalf of the course provider to do their assignments in collaborative groups. They are seemingly both positively surprised by the challenges that group work offer, and they are less positive to the downsides of group work. The paper discusses both sides of the experiences and suggests why this might be a paradox to live with.

  10. Military Munitions Waste Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    This report presents the findings of the Military Munitions Waste Working Group in its effort to achieve the goals directed under the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT Committee) for environmental restoration and waste management. The Military Munitions Waste Working Group identified the following seven areas of concern associated with the ordnance (energetics) waste stream: unexploded ordnance; stockpiled; disposed -- at known locations, i.e., disposal pits; discharged -- impact areas, unknown disposal sites; contaminated media; chemical sureties/weapons; biological weapons; munitions production; depleted uranium; and rocket motor and fuel disposal (open burn/open detonation). Because of time constraints, the Military Munitions Waste Working Group has focused on unexploded ordnance and contaminated media with the understanding that remaining waste streams will be considered as time permits. Contents of this report are as follows: executive summary; introduction; Military Munitions Waste Working Group charter; description of priority waste stream problems; shortcomings of existing approaches, processes and technologies; innovative approaches, processes and technologies, work force planning, training, and education issues relative to technology development and cleanup; criteria used to identify and screen potential demonstration projects; list of potential candidate demonstration projects for the DOIT committee decision/recommendation and appendices

  11. Military Munitions Waste Working Group report

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-30

    This report presents the findings of the Military Munitions Waste Working Group in its effort to achieve the goals directed under the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT Committee) for environmental restoration and waste management. The Military Munitions Waste Working Group identified the following seven areas of concern associated with the ordnance (energetics) waste stream: unexploded ordnance; stockpiled; disposed -- at known locations, i.e., disposal pits; discharged -- impact areas, unknown disposal sites; contaminated media; chemical sureties/weapons; biological weapons; munitions production; depleted uranium; and rocket motor and fuel disposal (open burn/open detonation). Because of time constraints, the Military Munitions Waste Working Group has focused on unexploded ordnance and contaminated media with the understanding that remaining waste streams will be considered as time permits. Contents of this report are as follows: executive summary; introduction; Military Munitions Waste Working Group charter; description of priority waste stream problems; shortcomings of existing approaches, processes and technologies; innovative approaches, processes and technologies, work force planning, training, and education issues relative to technology development and cleanup; criteria used to identify and screen potential demonstration projects; list of potential candidate demonstration projects for the DOIT committee decision/recommendation and appendices.

  12. Working group report on forestry

    International Nuclear Information System (INIS)

    MacIver, D.

    1991-01-01

    The results and conclusions of a working group held to discuss the state of knowledge and information needs concerning potential climate change implications for forestry are presented. The lack of knowledge in some basic processes, for example physiological and genetics, limits ability to evaluate and project the adaptation and responses to climate change. Areas where knowledge is weak include: the potential maximum productivity for a given climate region; the extent to which climate change can be accomodated by genetic adaptation; ways to improve the temporal/spatial distribution of projected precipitation and temperature changes and their magnitudes; the effect of global warming on fire severity and behavior; the current lightning distribution and relationship to fire and the response of this to global warming; socio-economic needs and constraints for management of wilderness areas; carbon dioxide enrichment effects on forest growth and water use efficiency; carbon benefits associated with afforestation and other carbon sequestering programs; impacts of forest practices on the carbon cycle; and the definition of biological diversity on the Great Plains. Recommended research initiatives include improving climate projections, targetted biological process research, monitoring for change and adaptive management, and development of decision support systems

  13. The Goal of the IAU/IAG Joint Working Group on the Theory of Earth Rotation

    Science.gov (United States)

    Ferrandiz, J. M.; Gross, R. S.

    2013-01-01

    In 2012 the International Association of Geodesy (IAG) and the International Astronomical Union (IAU) initiated a process to establish a Joint Working Group (JWG) on theory of Earth rotation with the purpose of promoting the development of improved theories of the Earth rotation which reach the accuracy required to meet the needs of the near future as recommended by, e.g. GGOS, the Global Geodetic Observing System of the IAG. The JWG was approved by both organizations in April 2013 with the chairs being the two authors of this paper. Its structure comprises three Sub Working Groups (SWGs) addressing Precession/Nutation, Polar Motion and UT1, the Numerical Solutions and Validation, respectively. The SWGs should work in parallel for the sake of efficiency, but should keep consistency as an overall goal. This paper offers a view of the objectives and scope of the JWG and reports about its initial activities and plans.

  14. Has Group Work Education Lost Its Social Group Work Essence? A Content Analysis of MSW Course Syllabi in Search of Mutual Aid and Group Conflict Content

    Science.gov (United States)

    Sweifach, Jay Stephen

    2015-01-01

    This article presents the results of a content analysis of MSW group work course syllabi in an effort to better understand the extent to which mutual aid and group conflict, two important dimensions of social group work, are included and featured as prominent elements in MSW-level group work instruction.

  15. Natural analogue working group

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.

    1986-01-01

    A Natural Analogue Working Group was established by the Commission of the European Communities in 1985. The purpose of this group is to bring together modellers with earth scientists and others, so that maximum benefit can be obtained from natural analogue studies with a view to safe geological disposal of radioactive waste. The first meeting of this group was held in Brussels from November 5 to 7, 1985. The discussions mainly concerned the identification of the modellers' needs and of the earth scientists' capacity to provide for them. Following the debates, a written statement was produced by the Group; this document forms the core of the present Report. Notes and outlines of many of the presentations made are grouped in four appendixes. The valuable contribution of all those involved in the meeting is gratefully acknowledged

  16. The work of the 'Irradiation Damage' sub-group of the EURATOM Working Group on Research Reactor Dosimetry

    International Nuclear Information System (INIS)

    Genthon, J.P.

    1975-01-01

    The EURATOM Working Group on Reactor Dosimetry is investigating the problems of the dosimetry of radiation damage experiments. Papers have been published on the dosimetry of graphite and irradiation of metals: the model chosen, the quantities employed to express the fluences, numerical values, measurements, and measurement techniques. The ensuing work of the EURATOM Working Group of Reactor Dosimetry in these areas will deal with the measurement methods required for the dosimetry of radiation damage. (Auth.)

  17. AER Working Group B activities in 2001

    International Nuclear Information System (INIS)

    Darilek, P.

    2001-01-01

    Review of AER Working Group B Meeting in Czech Republic - Plzen is given. Regular meeting of Core Design Group was organized by SKODA JS, Inc. and held at Plzen-Bolevec, Czech Republic, May 21+22, 2001, together with Working Group A (Authors)

  18. Summary of the NICHD-BPCA Pediatric Formulation Initiatives Workshop-Pediatric Biopharmaceutics Classification System (PBCS) Working Group

    OpenAIRE

    Abdel-Rahman, Susan; Amidon, Gordon L.; Kaul, Ajay; Lukacova, Viera; Vinks, Alexander A.; Knipp, Gregory

    2012-01-01

    The Biopharmaceutics Classification System (BCS) allows compounds to be classified based on their in vitro solubility and intestinal permeability. The BCS has found widespread use in the pharmaceutical community as an enabling guide for the rational selection of compounds, formulation for clinical advancement and generic biowaivers. The Pediatric Biopharmaceutics Classification System (PBCS) working group was convened to consider the possibility of developing an analogous pediatric based clas...

  19. Mission Operations and Information Management Area Spacecraft Monitoring and Control Working Group

    Science.gov (United States)

    Lokerson, Donald C. (Editor)

    2005-01-01

    Working group goals for this year are: Goal 1. Due to many review comments the green books will be updated and available for re-review by CCSDS. Submission of green books to CCSDS for approval. Goal 2.Initial set of 4 new drafts of the red books as following: SM&C protocol: update with received comments. SM&C common services: update with received comments and expand the service specification. SM&C core services: update with received comments and expand the service the information model. SM&C time services: (target objective): produce initial draft following template of core services.

  20. Effects of Continuing Professional Development on Group Work Practices in Scottish Primary Schools

    Science.gov (United States)

    Thurston, A.; Christie, D.; Howe, C. J.; Tolmie, A.; Topping, K. J.

    2008-01-01

    The present study investigated the effects of a continuing professional development (CPD) initiative that provided collaborative group work skills training for primary school teachers. The study collected data from 24 primary school classrooms in different schools in a variety of urban and rural settings. The sample was composed of 332 pupils,…

  1. The ASME Section 11 Special Working Group On Plant Life Extension

    International Nuclear Information System (INIS)

    Katz, L.R.

    1990-01-01

    The codes and standards applicable to plant life extension have not been identified in the U.S. at this time. However, several initiatives have been taken to establish specific codes and standards pertaining to nuclear plant life extension (PLEX). One of these initiatives, sponsored by ASME, is the Section XI Special Working Group on Plant Life Extension (SWG-PLEX). The SWG-PLEX reports to the ASME Section XI Subcommittee and is responsible for recommending or drafting rules and requirements for modifying Section XI to accommodate age-related degradation to support nuclear plant life extension. This paper summarizes the results and reports the activities of the SWG-PLEX during the 1989/1990 period

  2. Multibunch working group

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The goal of this working group was to foment discussions about the use and limitations of multi-bunch, representatives from most operating or in-project synchrotron radiation sources (ALS, SPEAR, BESSY-2, SPRING-8, ANKA, DELTA, PEP-2, DIAMOND, ESRF...) have presented their experience. The discussions have been led around 3 topics: 1) resistive wall instabilities and ion instabilities, 2) higher harmonic cavities, and 3) multibunch feedback systems.

  3. Progression paths in children's problem solving: The influence of dynamic testing, initial variability, and working memory.

    Science.gov (United States)

    Resing, Wilma C M; Bakker, Merel; Pronk, Christine M E; Elliott, Julian G

    2017-01-01

    The current study investigated developmental trajectories of analogical reasoning performance of 104 7- and 8-year-old children. We employed a microgenetic research method and multilevel analysis to examine the influence of several background variables and experimental treatment on the children's developmental trajectories. Our participants were divided into two treatment groups: repeated practice alone and repeated practice with training. Each child received an initial working memory assessment and was subsequently asked to solve figural analogies on each of several sessions. We examined children's analogical problem-solving behavior and their subsequent verbal accounts of their employed solving processes. We also investigated the influence of verbal and visual-spatial working memory capacity and initial variability in strategy use on analogical reasoning development. Results indicated that children in both treatment groups improved but that gains were greater for those who had received training. Training also reduced the influence of children's initial variability in the use of analogical strategies with the degree of improvement in reasoning largely unrelated to working memory capacity. Findings from this study demonstrate the value of a microgenetic research method and the use of multilevel analysis to examine inter- and intra-individual change in problem-solving processes. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. The FORATOM Transport Working Group

    International Nuclear Information System (INIS)

    Lehmann, P.

    2000-01-01

    Based in Brussels, the European atomic forum FORATOM is the trade association of the European nuclear industry which was established in the early 1960s to promote nuclear power and to facilitate relations with the European institutions. One of the main mechanisms which FORATOM uses, in its dealings with the European Commission and other international organisations, is the involvement of several working groups bringing together groups of experts drawn from the industrial companies in order to identify the issues and to develop the widest possible common views on which the industry must express its representative, substantial and deliverable opinion. The Transport Working Group (TWG) has the objective of dealing with transport of radioactive material, especially nuclear materials. The TWG usually meets three times a year in Brussels or another selected location. It has strong links with the European Commission which are evidenced by the fact that it officially represents the European nuclear industry, with the status of observer, at the meetings of the Standing Working Group on Safe Transport of Radioactive Material which was set up in 1982, upon a request of the European Parliament, to advise the European Commission in the field of safe transport of radioactive materials. The Standing Working Group (SWG) assists the European Union's Member States in the revision process of IAEA recommendations and helps a correct and harmonious application of these recommendations within the European Union. In previous years, the Standing Working Group has proposed over 40 different studies, financed by the European Commission, on important transport issues. The FORATOM TWG encourages its member organisations to participate in studies proposed by the Commission and has been cooperating for many years with the Commission in the field of many studies aimed to improve the application of transport regulations. The need to maintain the safe and reliable operation of plants that generate

  5. Interim Report on ISO TC 163 Working Group 3. Annual progress report

    Energy Technology Data Exchange (ETDEWEB)

    Fairey, Philip [Florida Solar Energy Center, Cocoa, FL (United States)

    2009-04-02

    This reports cover the initial year efforts of the International Standards Organization (ISO) to develop international standards for rating the energy performance of buildings. The author of this report is a participant in this effort. This report summarizes the activities of the ISO Working Group charged with development of these standards and makes recommendations to the sponsors for future U.S. involvement in this ISO effort.

  6. The dynamics of access to groups in working memory.

    Science.gov (United States)

    Farrell, Simon; Lelièvre, Anna

    2012-11-01

    The finding that participants leave a pause between groups when attempting serial recall of temporally grouped lists has been taken to indicate access to a hierarchical representation of the list in working memory. An alternative explanation is that the dynamics of serial recall solely reflect output (rather than memorial) processes, with the temporal pattern at input merely suggesting a basis for the pattern of output buffering. Three experiments are presented here that disentangle input structure from output buffering in serial recall. In Experiment 1, participants were asked to recall a subset of visually presented digits from a temporally grouped list in their original order, where either within-group position or group position was kept constant. In Experiment 2, participants performed more standard serial recall of spoken digits, and input and output position were dissociated by asking participants to initiate recall from a post-cued position in the list. In Experiment 3, participants were asked to serially recall temporally grouped lists of visually presented digits where the grouping structure was unpredictable, under either articulatory suppression or silent conditions. The 3 experiments point to a tight linkage between implied memorial structures (i.e., the pattern of grouping at encoding) and the output structure implied by retrieval times and call into question a purely motoric account of the dynamics of recall.

  7. PM of the Vuotos working group

    International Nuclear Information System (INIS)

    Ojala, J.; Oikarinen, S.

    1995-01-01

    In the program for the Finnish Government will study the premises of the Vuotos Basin Project in the light of the most recent environment studies. For this purpose the Ministry of Trade and Industry appointed a working group. The working group has studied the latest reports on the Vuotos Project which were available up to 30 9.1995. The working group also updated the projections of the energy significance of the project and how it would affect employment. The working group arrived at these conclusions: The Vuotos Project is still of energy economy significance because the need for domestic energy production capacity - and also capacity that can be regulated - is on the rise. The project will not cause any fatal diminishing of the abundance of any Finnish plant or animal species, but it will diminish the number of habitants for some threatened plants and birds. Thus it will diminish the diversity of Finnish nature and the possibilities to use the area for many purposes. The project will cause the weakening of water quality in the streams beneath the basin for the first few years. The project is important for employment reasons, because it will diminish unemployment during construction by 2-8 %-units, depending on the county, and it will make the creation of new jobs possible in the long run. The working group thinks that estimates of experts concerning the pros and cons of the project are quite different and that the final weighing of the considerable body of research and reports can best be made at the Water Court proceedings. (author)

  8. Technology working group

    International Nuclear Information System (INIS)

    Tsujikura, Y.

    2000-01-01

    The workshop of 26-27 june 2000, on nuclear power Plant LIfe Management (PLIM), also included working groups in which major issues facing PLIM activities for nuclear power plants were identified and discussed. The first group was on Technology. Utilities should consider required provisions capacity by properly maintaining and preserving the existing power plants to the extent practicable and taking into account growing demand, limits of energy conservation, and difficulties in finding new power plant sites. Generally, the extension of the life of nuclear power plant (e.g. from 40 years to 60 years) is an attractive option for utilities, as the marginal cost of most existing nuclear power plants is lower than that of almost all other power sources. It is also an attractive option for environmental protection. Consequently, PLIM has become an important issue in the context of the regulatory reform of the electricity markets. Therefore, the three main objectives of the Technology working group are: 1) Documenting how the safety of nuclear power plants being operated for the long-term has been confirmed, and suggesting ways of sharing this information. 2) Addressing development of advanced maintenance technologies necessary over the plant lifetime, and clarifying their technical challenges. 3) Suggesting potential areas of research and development that might, be necessary. Some potential examples of such research include: - improving the effectiveness of maintenance methods to assure detection of incipient faults; - providing cost effective preventive maintenance programmes; - furnishing systematic, cost-effective refurbishment programmes framed to be consistent with efforts to extend the time between re-fuelling; - developing a methodology that moves routine maintenance on-line without compromising safety. (author)

  9. Group identity and positive deviance in work groups.

    Science.gov (United States)

    Kim, Moon Joung; Choi, Jin Nam

    2017-12-05

    This study examines why and how identity cognitions, including group identification and individual differentiation, influence the positive deviance of employees. We identify the risk-taking intention of employees as a critical psychological mechanism to overcome stigma-induced identity threat of positive deviance. The analysis of data collected from 293 members comprising 66 work teams reveals that the relationship between individual differentiation and positive deviance is partially mediated by risk-taking intention. The indirect effect of group identification on positive deviance through risk-taking intention is also significant and positive in groups with low conformity pressure, whereas the same indirect effect is neutralized in groups with high conformity pressure. The current analysis offers new insights into the way the group context and the identity cognition of members explain the development of positive deviance and workplace creativity.

  10. AER Working Group B activities in 2010

    International Nuclear Information System (INIS)

    Darilek, P.

    2010-01-01

    Review of AER Working Group B Meeting in Modra - Harmonia, Slovakia is given. Regular meeting of Core Design Group was organized by VUJE, Inc. and held at Modra - pension Harmonia, Slovakia, April 20-22, 2010, together with Working Group A. Presented papers (see List of papers and List of participants) covered topics as follows. (Author)

  11. Fairness perceptions of work-life balance initiatives: effects on counterproductive work behaviour

    OpenAIRE

    Beauregard, T. Alexandra

    2014-01-01

    This study examined the impact of employees’ fairness perceptions regarding organizational work-life balance initiatives on their performance of counterproductive work behaviour (CWB). Moderating effects of adaptive and maladaptive perfectionism were also explored. Quantitative data collected from 224 public sector employees demonstrated significant main and moderating effects of informational justice, adaptive perfectionism and maladaptive perfectionism on CWB. Adaptive perfectionism weakene...

  12. Working group report on water resources

    International Nuclear Information System (INIS)

    Baulder, J.

    1991-01-01

    The results and conclusions of a working group held to discuss climate change implications for water resources are presented. The existing water resources and climatological databases necessary to develop models and functional relationships lack integration and coordination. The density and spatial distribution of the existing sampling networks for obtaining necessary climatological data is inadequate, especially in areas of complex terrain, notably higher elevations in the Rocky Mountains. Little information and knowledge is available on potential socio-economic responses that can be anticipated from either increases in climate variability or major change. Recommended research initiatives include the following. Basic functional relationships between climatic events, climatic variability and change, and both surface and groundwater hydrologic processes need to be investigated and improved. Basin-scale and regional-scale climatic models need to be developed, tested, and interfaced with existing global climate models. Public sector attitudes to water management issues and opportunities need to be investigated, and integrated scientific, socio-economic, multidisciplinary, regional databases on climatic change and variability and associated processes need to be developed

  13. Executive Committee Working Group: Women in Astronomy

    Science.gov (United States)

    Primas, Francesca; Maddison, Sarah; Primas, Francesca; Aerts, Conny; Clayton, Geoffrey; Combes, Françoise; Elmegreen, Debra; Feretti, Luigina; Jog, Chanda; Kobayashi, Chiaki; Lazzaro, Daniela; Liang, Yanchun; Mandrini, Cristina; Mathews, Brenda; Rovira, Marta

    2016-04-01

    The gender† dimension of science and technology has become one of the most important and debated issues worldwide, impacting society at every level. A variety of international initiatives on the subject have been undertaken, including the continued monitoring of the status of women in science by Unesco Institute for Statistics (UIS) or the annual reports ``Education at a Glance'' by the Organization for Economic Co-operation and Development (OECD) as well as field-related working groups and networking in order to collect data in a consistent manner. The majority of the international organizations have made clear statements about their discrimination policies (independently of their main field(s) of action), including the International Council for Science whose regulations are followed by the IAU. Gender equality at large is one of the eight United Nations Millennium Development Goals, which clearly calls for action related to science, technology and gender.

  14. Preliminary recommendations of the Noise Working Group

    International Nuclear Information System (INIS)

    Legerton, M.L.

    1995-01-01

    In 1993 the DTI set up a Working Group largely consisting of independent experts on wind turbine noise. The main objectives of the Working Group were to define a framework which can be used to measure and rate the noise from wind turbines and to provide indicative noise levels thought to offer a reasonable degree of protection to wind farm neighbours and encourage best practice in turbine design and wind farm siting and layout. This paper presents the preliminary recommendations of the Working Group. (Author)

  15. Working group report: Neutrino physics

    Indian Academy of Sciences (India)

    olation. PACS No. 14.6.q. 1. Introduction. It was decided to cover a myriad of topics for discussion and work in the neu- trino physics working group, rather than restrict ourselves to any one focal theme. 269 ..... [8] Super-Kamiokande Collaboration: K Abe et al, Phys. Rev. Lett. 97, 171801 (2006), hep-ex/0607059.

  16. Who initiates and organises situations for work-related alcohol use? The WIRUS culture study.

    Science.gov (United States)

    Nordaune, Kristin; Skarpaas, Lisebet S; Sagvaag, Hildegunn; Haveraaen, Lise; Rimstad, Silje; Kinn, Liv G; Aas, Randi W

    2017-12-01

    Alcohol is one of the leading causes of ill health and premature death in the world. Several studies indicate that working life might influence employees' alcohol consumption and drinking patterns. The aim of this study was to explore work-related drinking situations, with a special focus on answering who initiates and organises these situations. Data were collected through semi-structured group interviews in six Norwegian companies from the private ( n=4) and public sectors ( n=2), employing a total of 3850 employees. The informants ( n=43) were representatives from management and local unions, safety officers, advisers from the social insurance office and human-resource personnel, health, safety and environment personnel, and members from the occupational environment committee. Both qualitative and quantitative content analyses were applied in the analyses of the material. Three different initiators and organisers were discovered: the employer, employees and external organisers. External organisers included customers, suppliers, collaborators, sponsors, subcontractors, different unions and employers' organisations. The employer organised more than half of the situations; external organisers were responsible for more than a quarter. The differences between companies were mostly due to the extent of external organisers. The employer initiates and organises most situations for work-related alcohol use. However, exposure to such situations seems to depend on how many external relations the company has. These aspects should be taken into account when workplace health-promotion initiatives are planned.

  17. Working Group Report: Neutrinos

    Energy Technology Data Exchange (ETDEWEB)

    de Gouvea, A.; Pitts, K.; Scholberg, K.; Zeller, G. P. [et al.

    2013-10-16

    This document represents the response of the Intensity Frontier Neutrino Working Group to the Snowmass charge. We summarize the current status of neutrino physics and identify many exciting future opportunities for studying the properties of neutrinos and for addressing important physics and astrophysics questions with neutrinos.

  18. Group Chaos Theory: A Metaphor and Model for Group Work

    Science.gov (United States)

    Rivera, Edil Torres; Wilbur, Michael; Frank-Saraceni, James; Roberts-Wilbur, Janice; Phan, Loan T.; Garrett, Michael T.

    2005-01-01

    Group phenomena and interactions are described through the use of the chaos theory constructs and characteristics of sensitive dependence on initial conditions, phase space, turbulence, emergence, self-organization, dissipation, iteration, bifurcation, and attractors and fractals. These constructs and theoretical tenets are presented as applicable…

  19. HEP Software Foundation Community White Paper Working Group - Detector Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Apostolakis, J; et al.

    2018-03-12

    A working group on detector simulation was formed as part of the high-energy physics (HEP) Software Foundation's initiative to prepare a Community White Paper that describes the main software challenges and opportunities to be faced in the HEP field over the next decade. The working group met over a period of several months in order to review the current status of the Full and Fast simulation applications of HEP experiments and the improvements that will need to be made in order to meet the goals of future HEP experimental programmes. The scope of the topics covered includes the main components of a HEP simulation application, such as MC truth handling, geometry modeling, particle propagation in materials and fields, physics modeling of the interactions of particles with matter, the treatment of pileup and other backgrounds, as well as signal processing and digitisation. The resulting work programme described in this document focuses on the need to improve both the software performance and the physics of detector simulation. The goals are to increase the accuracy of the physics models and expand their applicability to future physics programmes, while achieving large factors in computing performance gains consistent with projections on available computing resources.

  20. Assessment of the strategy countermeasures by the French farming working group

    International Nuclear Information System (INIS)

    Cessac, B.; Reales, N.; Gallay, F.

    2004-01-01

    In France, for several years, the Institute for Radiological Protection and Nuclear Safety (IRSN) has been working on technical solutions for the rehabilitation of rural, urban and industrial areas, contaminated by radioactivity. Then, the complexity of the radioactivity integration' s mechanisms into the environment and into the food chain, but also the important number of concerned actors and the inevitable incompatibilities between their respective expectations of the rehabilitation, make the post accidental management a challenging question for the responsible organisations at local, national and international levels. The involvement of persons in charge of agriculture in a collective reflection on the conditions and means of the post accidental situation's management seemed therefore necessary, in order to allow them to express the farmers point of view. On this basis, IRSN is deeply engaged in actions involving these other stakeholders, in particular in rural environment, in order to collect their appraisal and to obtain data and operational tools for the global evaluation of the countermeasures. The FARMING project, initiated in 2000 by the European Commission, constituted an interesting initiative in this direction. The French group has been constituted around the National Institute for Agronomy of Paris Grignon, which ensures its coordination. Within this framework, this group has notably been involved in the evaluation of a rural countermeasures compendium, at the request of STRATEGY, another European network on the post-accidental situation. With the support of a French farmers national association (FNSEA), the French FARMING group built up a working group composed of technical specialists of agriculture and radiation protection. All these actions facilitated the expression of the specific request for information, coming from the agricultural stakeholders, to the actors of radiation protection, and the design of new projects involving radiation

  1. Causal Relationships between Communication Confidence, Beliefs about Group Work, and Willingness to Communicate in Foreign Language Group Work

    Science.gov (United States)

    Fushino, Kumiko

    2010-01-01

    This article reports on the causal relationships between three factors in second language (L2) group work settings: communication confidence (i.e., confidence in one's ability to communicate), beliefs about group work, and willingness to communicate (WTC). A questionnaire was administered to 729 first-year university students in Japan. A model…

  2. Student Collaboration in Group Work: Inclusion as Participation

    Science.gov (United States)

    Forslund Frykedal, Karin; Hammar Chiriac, Eva

    2018-01-01

    Group work is an educational mode that promotes learning and socialisation among students. In this study, we focused on the inclusive processes when students work in small groups. The aim was to investigate and describe students' inclusive and collaborative processes in group work and how the teacher supported or impeded these transactions. Social…

  3. Customized Assessment Group Initiative: A Complementary Approach to Students' Learning

    Science.gov (United States)

    Akindayomi, Akinloye

    2015-01-01

    This study, conducted in a US setting, examines the importance of group dynamics that emphasize cooperative team building through the proposed grouping strategy called Customized Assessment Group Initiative (CAGI). CAGI is a student grouping strategy designed to operationalize the mutual accountability concept central to the definition of teams by…

  4. Summary Report of Working Group: Laser-Plasma Acceleration

    International Nuclear Information System (INIS)

    Esarey, Eric; Schroeder, Carl B.; Tochitsky, Sergei; Milchberg, Howard M.

    2004-01-01

    A summary is given on the work presented and discussed in the Laser-Plasma Acceleration Working Group at the 2004 Advanced Accelerator Concepts Workshop, including the Plasma Acceleration Subgroup (Group-Leader: Eric Esarey; Co-Group-Leader: Sergei Tochitsky) and the Plasma Guiding Subgroup (Group-Leader: Howard Milchberg; Co-Group-Leader: Carl Schroeder)

  5. Group Work Tests for Context-Rich Problems

    Science.gov (United States)

    Meyer, Chris

    2016-05-01

    The group work test is an assessment strategy that promotes higher-order thinking skills for solving context-rich problems. With this format, teachers are able to pose challenging, nuanced questions on a test, while providing the support weaker students need to get started and show their understanding. The test begins with a group discussion phase, when students are given a "number-free" version of the problem. This phase allows students to digest the story-like problem, explore solution ideas, and alleviate some test anxiety. After 10-15 minutes of discussion, students inform the instructor of their readiness for the individual part of the test. What follows next is a pedagogical phase change from lively group discussion to quiet individual work. The group work test is a natural continuation of the group work in our daily physics classes and helps reinforce the importance of collaboration. This method has met with success at York Mills Collegiate Institute, in Toronto, Ontario, where it has been used consistently for unit tests and the final exam of the grade 12 university preparation physics course.

  6. Early Sex Work Initiation and Violence against Female Sex Workers in Mombasa, Kenya.

    Science.gov (United States)

    Parcesepe, Angela M; L'Engle, Kelly L; Martin, Sandra L; Green, Sherri; Suchindran, Chirayath; Mwarogo, Peter

    2016-12-01

    Between 20 and 40 % of female sex workers (FSWs) began sex work before age 18. Little is known concerning whether early initiation of sex work impacts later experiences in adulthood, including violence victimization. This paper examines the relationship between early initiation of sex work and violence victimization during adulthood. The sample included 816 FSWs in Mombasa, Kenya, recruited from HIV prevention drop-in centers who were 18 years or older and moderate-risk drinkers. Early initiation was defined as beginning sex work at 17 or younger. Logistic regression modeled recent violence as a function of early initiation, adjusting for drop-in center, age, education, HIV status, supporting others, and childhood abuse. Twenty percent of the sample reported early initiation of sex work. Although both early initiators and other FSWs reported commonly experiencing recent violence, early initiators were significantly more likely to experience recent physical and sexual violence and verbal abuse from paying partners. Early initiation was not associated with physical or sexual violence from non-paying partners. Many FSWs begin sex work before age 18. Effective interventions focused on preventing this are needed. In addition, interventions are needed to prevent violence against all FSWs, in particular, those who initiated sex work during childhood or adolescence.

  7. Investigating the Effectiveness of Group Work in Mathematics

    Directory of Open Access Journals (Sweden)

    Anastasia Sofroniou

    2016-09-01

    Full Text Available Group work permits students to develop a range of critical thinking, analytical and communication skills; effective team work; appreciation and respect for other views, techniques and problem-solving methods, all of which promote active learning and enhance student learning. This paper presents an evaluation of employing the didactic and pedagogical customs of group work in mathematics with the aim of improving student performance as well as exploring students’ perceptions of working in groups. The evaluation of group work was carried out during tutorial time with first year civil engineering students undertaking a mathematics module in their second semester. The aim was to investigate whether group work learning can help students gain a deeper understanding of the module content, develop improved critical and analytical thinking skills and see if this method of pedagogy can produce higher performance levels. The group work sessions were conducted over four weeks whilst studying the topic of integration. Evaluation surveys were collected at the end of the intervention along with an investigation into the examination results from the end of semester examinations. In order to derive plausible and reasonable conclusions, these examination results were compared with an analogous cohort of first year mathematics students, also studying integration in their engineering-based degree. The investigation into the effectiveness of group work showed interesting and encouraging positive outcomes, supported by a combination of qualitative and quantitative analysis.

  8. INMM Physical Protection Technical Working Group Workshops

    International Nuclear Information System (INIS)

    Williams, J.D.

    1982-01-01

    The Institute of Nuclear Materials Management (INMM) established the Physical Protection Technical Working Group to be a focal point for INMM activities related to the physical protection of nuclear materials and facilities. The Technical Working Group has sponsored workshops with major emphasis on intrusion detection systems, entry control systems, and security personnel training. The format for these workshops has consisted of a series of small informal group discussions on specific subject matter which allows direct participation by the attendees and the exchange of ideas, experiences, and insights. This paper will introduce the reader to the activities of the Physical Protection Technical Working Group, to identify the workshops which have been held, and to serve as an introduction to the following three papers of this session

  9. The mixed waste focus area mercury working group: an integrated approach for mercury treatment and disposal

    International Nuclear Information System (INIS)

    Conley, T.B.; Morris, M.I.; Holmes-Burns, H.; Petersell, J.; Schwendiman, L.

    1997-01-01

    In May 1996, the U.S. Department of Energy (DOE) Mixed Waste Focus Area (MWFA) initiated the Mercury Work Group (HgWG), which was established to address and resolve the issues associated with mercury- contaminated mixed wastes. Three of the first four technology deficiencies identified during the MWFA technical baseline development process were related to mercury amalgamation, stabilization, and separation/removal. The HgWG will assist the MWFA in soliciting, identifying, initiating, and managing all the efforts required to address these deficiencies. The focus of the HgWG is to better establish the mercury-related treatment needs at the DOE sites, refine the MWFA technical baseline as it relates to mercury treatment, and make recommendations to the MWFA on how to most effectively address these needs. The team will initially focus on the sites with the most mercury-contaminated mixed wastes, whose representatives comprise the HgWG. However, the group will also work with the sites with less inventory to maximize the effectiveness of these efforts in addressing the mercury- related needs throughout the entire complex

  10. The Physics and Applications of High Brightness Beams: Working Group C Summary on Applications to FELS

    International Nuclear Information System (INIS)

    Nuhn, Heinz-Dieter

    2003-01-01

    This is the summary of the activities in working group C, ''Application to FELs,'' which was based in the Bithia room at the Joint ICFA Advanced Accelerator and Beam Dynamics Workshop on July 1-6, 2002 in Chia Laguna, Sardinia, Italy. Working group C was small in relation to the other working groups at that workshop. Attendees include Enrica Chiadroni, University of Rome ape with an identical pulse length. ''La Sapienza'', Luca Giannessi, ENEA, Steve Lidia, LBNL, Vladimir Litvinenko, Duke University, Patrick Muggli, UCLA, Alex Murokh, UCLA, Heinz-Dieter Nuhn, SLAC, Sven Reiche, UCLA, Jamie Rosenzweig, UCLA, Claudio Pellegrini, UCLA, Susan Smith, Daresbury Laboratory, Matthew Thompson, UCLA, Alexander Varfolomeev, Russian Research Center, plus a small number of occasional visitors. The working group addressed a total of nine topics. Each topic was introduced by a presentation, which initiated a discussion of the topic during and after the presentation. The speaker of the introductory presentation facilitated the discussion. There were six topics that were treated in stand-alone sessions of working group C. In addition, there were two joint sessions, one with working group B, which included one topic, and one with working group C, which included two topics. The presentations that were given in the joint sessions are summarized in the working group summary reports for groups B and D, respectively. This summary will only discuss the topics that were addressed in the stand-alone sessions, including Start-To-End Simulations, SASE Experiment, PERSEO, ''Optics Free'' FEL Oscillators, and VISA II

  11. Metabolomics and Epidemiology Working Group

    Science.gov (United States)

    The Metabolomics and Epidemiology (MetEpi) Working Group promotes metabolomics analyses in population-based studies, as well as advancement in the field of metabolomics for broader biomedical and public health research.

  12. Astrophysics at RIA (ARIA) Working Group

    International Nuclear Information System (INIS)

    Smith, Michael S.; Schatz, Hendrik; Timmes, Frank X.; Wiescher, Michael; Greife, Uwe

    2006-01-01

    The Astrophysics at RIA (ARIA) Working Group has been established to develop and promote the nuclear astrophysics research anticipated at the Rare Isotope Accelerator (RIA). RIA is a proposed next-generation nuclear science facility in the U.S. that will enable significant progress in studies of core collapse supernovae, thermonuclear supernovae, X-ray bursts, novae, and other astrophysical sites. Many of the topics addressed by the Working Group are relevant for the RIKEN RI Beam Factory, the planned GSI-Fair facility, and other advanced radioactive beam facilities

  13. The Power and Promise of Group Work: Consumer Evaluation of Group Work Services in Gauteng, South Africa

    Science.gov (United States)

    Rasool, Shahana; Ross, Eleanor

    2017-01-01

    Purpose: In light of the limited research into consumers' experiences of group work services in South Africa, the study evaluated groups offered by a range of social service agencies in Gauteng to determine whether group interventions were perceived by users as developmental and empowering. Methods: Program evaluation was employed to evaluate 47…

  14. Proceedings of the ILC Physics Working Group Meeting at KEK in the period from May 2007 to June 2009

    CERN Document Server

    AUTHOR|(CDS)2080137; Ono, Hiroaki; Kanemura, Shinya; Suehara, Taikan; Takubo, Yosuke; Tanabe, Tomohiko; Fujii, Keisuke

    2010-01-01

    The ILC physics working group is a mixture of experimentalists and theorists mainly working in Japan. It has its origin in the previous LC physics study group and has been reformed with the initiative of a JSPS Creative Scientific Research project: "Research and Development of a Novel Detector System for the International Linear Collider". The working group is, however, formally independent of the JSPS project and is open to everybody who is interested in ILC physics. The primary task of the working group is to reexamine the ILC physics in the context of the expected LHC outcome and to further strengthen the physics case for the ILC project. The topics covered in the working group activities range from key measurements such as those of the Higgs self-coupling and the top Yukawa coupling to uncover the secrets of the electroweak symmetry breaking to various new physics scenarios like supersymmetry, large extra dimensions, and other models of terascale physics. The working group has held ten General Meetings in...

  15. [Organizational and individual determinants of using initiatives conducive to successful work-life balance].

    Science.gov (United States)

    Andysz, Aleksandra; Najder, Anna; Merecz-Kot, Dorota

    2014-01-01

    Appropriate distribution of time and energy between work and personal life poses a challenge to many working people. Unfortunately, many professionally active people experience work-family conflict. In order to minimize it, employees are offered various solutions aimed at reconciling professional and private spheres (work-life balance (WLB) initiatives). The authors attempt to answer what makes employees use WLB initiatives and what influences the decision to reject the available options. The review is based on the articles published after 2000, searched by Google Scholar and Web of Knowledge with use of the key words: work-life balance, work-family conflict, work-life balance initiatives, work-life balance initiatives use, use of WLB solutions. We focused on organizational and individual determinants of WLB initiatives use, such as organizational culture, stereotypes and values prevailing in the work environment that may result in stigmatization of workers - flexibility stigma. We discuss the reasons why supervisors and co-workers stigmatize their colleagues, and what are the consequences of experiencing such stigmatization. Among the individual determinants of WLB initiatives use, we have inter alia focused on the preference for integration vs. separation of the spheres of life. The presented material shows that social factors - cultural norms prevailing in a society, relationships in the workplace and individual factors, such as the level of self-control - are of equal importance for decisions of using WLB initiatives as their existence. Our conclusion is that little attention has been paid to the research on determinants of WLB initiatives use, especially to individual ones.

  16. Working Group Report: Quantum Chromodynamics

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, J. M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-10-18

    This is the summary report of the energy frontier QCD working group prepared for Snowmass 2013. We review the status of tools, both theoretical and experimental, for understanding the strong interactions at colliders. We attempt to prioritize important directions that future developments should take. Most of the efforts of the QCD working group concentrate on proton-proton colliders, at 14 TeV as planned for the next run of the LHC, and for 33 and 100 TeV, possible energies of the colliders that will be necessary to carry on the physics program started at 14 TeV. We also examine QCD predictions and measurements at lepton-lepton and lepton-hadron colliders, and in particular their ability to improve our knowledge of strong coupling constant and parton distribution functions.

  17. 77 FR 45370 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2012-07-31

    ...-FF08EACT00] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders... take place at the North Fork Grange Hall, Dutch Creek Road, Junction City, CA 96048. The group will...

  18. Abandoned Mine Waste Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    The Mine Waste Working Group discussed the nature and possible contributions to the solution of this class of waste problem at length. There was a consensus that the mine waste problem presented some fundamental differences from the other classes of waste addresses by the Develop On-Site Innovative Technologies (DOIT) working groups. Contents of this report are: executive summary; stakeholders address the problems; the mine waste program; current technology development programs; problems and issues that need to be addressed; demonstration projects to test solutions; conclusion-next steps; and appendices

  19. Small-group learning in an upper-level university biology class enhances academic performance and student attitudes toward group work.

    Science.gov (United States)

    Gaudet, Andrew D; Ramer, Leanne M; Nakonechny, Joanne; Cragg, Jacquelyn J; Ramer, Matt S

    2010-12-29

    To improve science learning, science educators' teaching tools need to address two major criteria: teaching practice should mirror our current understanding of the learning process; and science teaching should reflect scientific practice. We designed a small-group learning (SGL) model for a fourth year university neurobiology course using these criteria and studied student achievement and attitude in five course sections encompassing the transition from individual work-based to SGL course design. All students completed daily quizzes/assignments involving analysis of scientific data and the development of scientific models. Students in individual work-based (Individualistic) sections usually worked independently on these assignments, whereas SGL students completed assignments in permanent groups of six. SGL students had significantly higher final exam grades than Individualistic students. The transition to the SGL model was marked by a notable increase in 10th percentile exam grade (Individualistic: 47.5%; Initial SGL: 60%; Refined SGL: 65%), suggesting SGL enhanced achievement among the least prepared students. We also studied student achievement on paired quizzes: quizzes were first completed individually and submitted, and then completed as a group and submitted. The group quiz grade was higher than the individual quiz grade of the highest achiever in each group over the term. All students--even term high achievers--could benefit from the SGL environment. Additionally, entrance and exit surveys demonstrated student attitudes toward SGL were more positive at the end of the Refined SGL course. We assert that SGL is uniquely-positioned to promote effective learning in the science classroom.

  20. Social benefits in the Working for Water programme as a public works initiative

    CSIR Research Space (South Africa)

    Magadlela, D

    2004-01-01

    Full Text Available The Working for Water programme is a pioneering environmental conservation initiative in that its implementation successfully combines ecological concerns and social development benefits. By addressing unemployment, skills training and empowerment...

  1. Organizational and individual determinants of using initiatives conducive to successful work-life balance

    Directory of Open Access Journals (Sweden)

    Aleksandra Andysz

    2014-02-01

    Full Text Available Appropriate distribution of time and energy between work and personal life poses a challenge to many working people. Unfortunately, many professionally active people experience work-family conflict. In order to minimize it, employees are offered various solutions aimed at reconciling professional and private spheres (work-life balance (WLB initiatives. The authors attempt to answer what makes employees use WLB initiatives and what influences the decision to reject the available options. The review is based on the articles published after 2000, searched by Google Scholar and Web of Knowledge with use of the key words: work-life balance, work-family conflict, work-life balance initiatives, work-life balance initiatives use, use of WLB solutions. We focused on organizational and individual determinants of WLB initiatives use, such as organizational culture, stereotypes and values prevailing in the work environment that may result in stigmatization of workers - flexibility stigma. We discuss the reasons why supervisors and co-workers stigmatize their colleagues, and what are the consequences of experiencing such stigmatization. Among the individual determinants of WLB initiatives use, we have inter alia focused on the preference for integration vs. separation of the spheres of life. The presented material shows that social factors - cultural norms prevailing in a society, relationships in the workplace and individual factors, such as the level of self-control - are of equal importance for decisions of using WLB initiatives as their existence. Our conclusion is that little attention has been paid to the research on determinants of WLB initiatives use, especially to individual ones. Med Pr 2014;65(1:119–129

  2. Group Work with Juvenile Delinquents.

    Science.gov (United States)

    Zimpfer, David G.

    1992-01-01

    Reviews group work literature on juvenile delinquents. Presents overview of interventions, including positive peer culture, cognitive-behavioral treatment, psychoeducational treatment, treatment of learned behavior, action-oriented treatment, milieu therapy, parental involvement, assertiveness training, and music therapy. Discusses outcome…

  3. A student-facilitated community-based support group initiative for ...

    African Journals Online (AJOL)

    A student-facilitated community-based support group initiative for Mental Health ... was a collaborative partnership between a local University Psychology Department ... users, Rehabilitation, Primary Health Care, Social support, Stigmatisation ...

  4. CEC natural analogue working group

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1986-01-01

    The second meeting of the CEC Natural Analogue Working Group took place on June 17-19, 1986, hosted by the Swiss NAGRA in Interlaken (CH). A review of recent progress in natural analogue programmes was carried out, and complemented by detailed discussions about geomicrobiology, archaeological analogues, natural colloids, and use of analogues to increase confidence in safety assessments for radioactive waste disposal. A statement drafted by the Group, and the presentations made, are put together in this report

  5. Complex dynamics in supervised work groups

    Science.gov (United States)

    Dal Forno, Arianna; Merlone, Ugo

    2013-07-01

    In supervised work groups many factors concur to determine productivity. Some of them may be economical and some psychological. According to the literature, the heterogeneity in terms of individual capacity seems to be one of the principal causes for chaotic dynamics in a work group. May sorting groups of people with same capacity for effort be a solution? In the organizational psychology literature an important factor is the engagement in the task, while expectations are central in the economics literature. Therefore, we propose a dynamical model which takes into account both engagement in the task and expectations. An important lesson emerges. The intolerance deriving from the exposure to inequity may not be only caused by differences in individual capacities, but also by these factors combined. Consequently, solutions have to be found in this new direction.

  6. Health in Transportation Working Group 2016 Annual Report

    Science.gov (United States)

    2017-06-30

    The Health in Transportation Working Group 2016 Annual Report provides an overview of the Working Groups activities and accomplishments in 2016, summarizes other USDOT health-related accomplishments, and documents its progress toward the recommend...

  7. Physical Workload and Work Capacity across Occupational Groups

    Science.gov (United States)

    Brighenti-Zogg, Stefanie; Mundwiler, Jonas; Schüpbach, Ulla; Dieterle, Thomas; Wolfer, David Paul; Leuppi, Jörg Daniel; Miedinger, David

    2016-01-01

    This study aimed to determine physical performance criteria of different occupational groups by investigating physical activity and energy expenditure in healthy Swiss employees in real-life workplaces on workdays and non-working days in relation to their aerobic capacity (VO2max). In this cross-sectional study, 337 healthy and full-time employed adults were recruited. Participants were classified (nine categories) according to the International Standard Classification of Occupations 1988 and merged into three groups with low-, moderate- and high-intensity occupational activity. Daily steps, energy expenditure, metabolic equivalents and activity at different intensities were measured using the SenseWear Mini armband on seven consecutive days (23 hours/day). VO2max was determined by the 20-meter shuttle run test. Data of 303 subjects were considered for analysis (63% male, mean age: 33 yrs, SD 12), 101 from the low-, 102 from the moderate- and 100 from the high-intensity group. At work, the high-intensity group showed higher energy expenditure, metabolic equivalents, steps and activity at all intensities than the other groups (pphysical activity between the occupational groups on non-working days. VO2max did not differ across groups when stratified for gender. The upper workload limit was 21%, 29% and 44% of VO2max in the low-, moderate- and high-intensity group, respectively. Men had a lower limit than women due to their higher VO2max (26% vs. 37%), when all groups were combined. While this study did confirm that the average workload limit is one third of VO2max, it showed that the average is misrepresenting the actual physical work demands of specific occupational groups, and that it does not account for gender-related differences in relative workload. Therefore, clinical practice needs to consider these differences with regard to a safe return to work, particularly for the high-intensity group. PMID:27136206

  8. 75 FR 34476 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2010-06-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide... of the Glen Canyon Dam Adaptive Management Work Group is in the public interest in connection with...

  9. Radiation sources working group summary

    International Nuclear Information System (INIS)

    Fazio, M.V.

    1998-01-01

    The Radiation Sources Working Group addressed advanced concepts for the generation of RF energy to power advanced accelerators. The focus of the working group included advanced sources and technologies above 17 GHz. The topics discussed included RF sources above 17 GHz, pulse compression techniques to achieve extreme peak power levels, components technology, technology limitations and physical limits, and other advanced concepts. RF sources included gyroklystrons, magnicons, free-electron masers, two beam accelerators, and gyroharmonic and traveling wave devices. Technology components discussed included advanced cathodes and electron guns, high temperature superconductors for producing magnetic fields, RF breakdown physics and mitigation, and phenomena that impact source design such as fatigue in resonant structures due to RF heating. New approaches for RF source diagnostics located internal to the source were discussed for detecting plasma and beam phenomena existing in high energy density electrodynamic systems in order to help elucidate the reasons for performance limitations

  10. Learning rights, participation and toleration in student group work

    DEFF Research Database (Denmark)

    Wiberg, Merete

    2013-01-01

    . This article offers a moral perspective on group work by introducing a concept of ‘learning rights’ of the individual in group work. The aim of the paper is theoretically to offer a vocabulary concerning ‘learning rights’ of the individual in group work by applying John Dewey’s metaphor ‘the spectator versus...

  11. Are groups working in the Information Technology class? | Mentz ...

    African Journals Online (AJOL)

    We discuss teache rs' perce ption of the use of group work in the Information Technology (IT) classroom. We describe the current situation regarding the implementation of group work in IT classrooms in South Africa as well as the challenges that IT teachers face when implementing group work. This information will be used ...

  12. Qualitative Research in Group Work: Status, Synergies, and Implementation

    Science.gov (United States)

    Rubel, Deborah; Okech, Jane E. Atieno

    2017-01-01

    The article aims to advance the use of qualitative research methods to understand group work. The first part of this article situates the use of qualitative research methods in relationship to group work research. The second part examines recent qualitative group work research using a framework informed by scoping and systematic review methods and…

  13. Letting the Drama into Group Work: Using Conflict Constructively in Performing Arts Group Practice

    Science.gov (United States)

    Crossley, Tracy

    2006-01-01

    The article examines conflict avoidance in performing arts group work and issues arising in relation to teaching and learning. In group theory, conflict is addressed largely in terms of its detrimental effects on group work, and its constructive potential is often marginalized. Similarly, undergraduate students usually interpret "effective…

  14. Flattening the organization: implementing self-directed work groups.

    Science.gov (United States)

    Brandon, G M

    1996-01-01

    In response to tremendous growth of managed care and threats to financial stability and job security, the Greater Baltimore Medical Center (GBMC) restructured itself into independent business units. The radiology department at GBMC resolved to reduce cost per unit-of-service, improve service, determine optimal staffing levels and reduce the number of layers of organization. It was decided to achieve those goals by implementing self-directed work groups. Staff buy-in was critical to success of the project. To begin, the staff was educated intensively about current trends in healthcare, managed care and potential changes in the job market. The radiology department was allowed to reduce the size of its staff through attrition and worked hard to focus staff concern on the impact each individual could have on the bottom line and the resultant effect on job security. Self-directed work groups were designed on a matrix that used small "service teams" in combinations to form larger "work groups." Actual work and daily activities occur at the service team level; information exchange and major decisions occue at the work group level. Seventeen months after beginning the project and 10 months after implementation, the organization has flattened, staff members have adjusted well to new roles, there have been no lay-offs, and the matrix system of small and large groups have proved particularly valuable.

  15. School Counselors' Experiential Training in Group Work

    Science.gov (United States)

    Bore, Samuel K.; Armstrong, Stephen A.; Womack, Ashley

    2010-01-01

    School counselors' perceptions of the efficacy and satisfaction of their experiential training in group work were investigated. An exploratory factor analysis (n = 304) revealed four salient factors: leader characteristics, leader responsibilities, child/adolescent group leadership and adult group leadership. A majority of participants indicated…

  16. Dealing with Free-Riders in Assessed Group Work: Results from a Study at a UK University

    Science.gov (United States)

    Maiden, Barbara; Perry, Bob

    2011-01-01

    Potential employers require graduates to be able to demonstrate competent teamwork skills in initiating ideas and solving problems cooperatively. Teamwork is prevalent in educational institutions and often included as a way of enriching learning and assessment. Whilst group working can provide a rich opportunity for cooperative learning, its…

  17. Euratom Neutron Radiography Working Group

    DEFF Research Database (Denmark)

    Domanus, Joseph Czeslaw

    1986-01-01

    reactor fuel as well as establish standards for radiographic image quality of neutron radiographs. The NRWG meets once a year in each of the neutron radiography centers to review the progress made and draw plans for the future. Besides, ad-hoc sub-groups or. different topics within the field of neutron......In 1979 a Neutron Radiography Working Group (NRWG) was constituted within Buratom with the participation of all centers within the European Community at which neutron facilities were available. The main purpose of NRWG was to standardize methods and procedures used in neutron radiography of nuclear...... radiography are constituted. This paper reviews the activities and achievements of the NRWG and its sub-groups....

  18. Volcanism/tectonics working group summary

    International Nuclear Information System (INIS)

    Kovach, L.A.; Young, S.R.

    1995-01-01

    This article is a summary of the proceedings of a group discussion which took place at the Workshop on the Role of Natural Analogs in Geologic Disposal of High-Level Nuclear Waste in San Antonio, Texas on July 22-25, 1991. The working group concentrated on the subject of the impacts of earthquakes, fault rupture, and volcanic eruption on the underground repository disposal of high-level radioactive wastes. The tectonics and seismic history of the Yucca Mountain site in Nevada is discussed and geologic analogs to that site are described

  19. S3T working group. Report 1: group aims

    International Nuclear Information System (INIS)

    Pouey, M.

    1983-04-01

    The work group S3T which is aimed to designing and developing devices using unconventional holographic optics is presented. These devices find applications that are classified here in four items high resolution spectrometers, high definition imaging, high flux devices, metrology and interferometry. The problems to solve and the aims of the group in each of these cases are presented. Three synthesis of lectures are in this report. The main one concerns stigmatism conditions of concave holographic gratings used in normal incidence. This new process of focusing is very interesting for hot plasma diagnostics [fr

  20. 75 FR 17158 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2010-04-05

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2010-N065; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  1. 75 FR 51284 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2010-08-19

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2010-N168; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  2. 75 FR 70947 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2010-11-19

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2010-N253; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  3. 76 FR 52345 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2011-08-22

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2011-N168; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  4. 76 FR 70751 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2011-11-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2011-N237; FXFR1334088TWG0W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  5. 75 FR 27814 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2010-05-18

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2010-N101; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  6. 76 FR 14044 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2011-03-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2011-N044; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  7. 76 FR 34248 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2011-06-13

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2011-N116; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  8. 76 FR 23621 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2011-04-27

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2011-N083; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  9. 75 FR 10501 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2010-03-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2010-N041; 81331-1334-8TWG-W4] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders the...

  10. Physical Workload and Work Capacity across Occupational Groups.

    Directory of Open Access Journals (Sweden)

    Stefanie Brighenti-Zogg

    Full Text Available This study aimed to determine physical performance criteria of different occupational groups by investigating physical activity and energy expenditure in healthy Swiss employees in real-life workplaces on workdays and non-working days in relation to their aerobic capacity (VO2max. In this cross-sectional study, 337 healthy and full-time employed adults were recruited. Participants were classified (nine categories according to the International Standard Classification of Occupations 1988 and merged into three groups with low-, moderate- and high-intensity occupational activity. Daily steps, energy expenditure, metabolic equivalents and activity at different intensities were measured using the SenseWear Mini armband on seven consecutive days (23 hours/day. VO2max was determined by the 20-meter shuttle run test. Data of 303 subjects were considered for analysis (63% male, mean age: 33 yrs, SD 12, 101 from the low-, 102 from the moderate- and 100 from the high-intensity group. At work, the high-intensity group showed higher energy expenditure, metabolic equivalents, steps and activity at all intensities than the other groups (p<0.001. There were no significant differences in physical activity between the occupational groups on non-working days. VO2max did not differ across groups when stratified for gender. The upper workload limit was 21%, 29% and 44% of VO2max in the low-, moderate- and high-intensity group, respectively. Men had a lower limit than women due to their higher VO2max (26% vs. 37%, when all groups were combined. While this study did confirm that the average workload limit is one third of VO2max, it showed that the average is misrepresenting the actual physical work demands of specific occupational groups, and that it does not account for gender-related differences in relative workload. Therefore, clinical practice needs to consider these differences with regard to a safe return to work, particularly for the high-intensity group.

  11. Summary, Working Group 1: Electron guns and injector designs

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; Bazarov, I.V.

    2006-01-01

    We summarize the proceedings of Working Group 1 of the 2005 Energy Recovery Linac (ERL) Workshop. The subject of this working group, the electron gun and injector design, is arguably the most critical part of the ERL as it determines the ultimate performance of this type of accelerators. Working Group 1 dealt with a variety of subjects: The technology of DC, normal-conducting RF and superconducting RF guns; beam dynamics in the gun and injector; the cathode and laser package; modeling and computational issues; magnetized beams and polarization. A short overview of these issues covered in the Working Group is presented in this paper

  12. GESAMP Working Group 38, The Atmospheric Input of Chemicals to the Ocean

    Science.gov (United States)

    Duce, Robert; Liss, Peter

    2014-05-01

    There is growing recognition of the impact of the atmospheric input of both natural and anthropogenic substances on ocean chemistry, biology, and biogeochemistry as well as climate. These inputs are closely related to a number of important global change issues. For example, the increasing input of anthropogenic nitrogen species from the atmosphere to much of the ocean may cause a low level fertilization that could result in an increase in marine 'new' productivity of up to ~3% and thus impact carbon drawdown from the atmosphere. Similarly, much of the oceanic iron, which is a limiting nutrient in significant areas of the ocean, originates from the atmospheric input of minerals as a result of the long-range transport of mineral dust from continental regions. The increased supply of soluble phosphorus from atmospheric anthropogenic sources (through large-scale use of fertilizers) may also have a significant impact on surface-ocean biogeochemistry, but estimates of any effects are highly uncertain. There have been few assessments of the atmospheric inputs of sulfur and nitrogen oxides to the ocean and their impact on the rates of ocean acidification. These inputs may be particularly critical in heavily trafficked shipping lanes and in ocean regions proximate to highly industrialized land areas. Other atmospheric substances may also have an impact on the ocean, in particular lead, cadmium, and POPs. To address these and related issues the United Nations Group of Experts on the Scientific Aspects of Marine Environmental Protection (GESAMP) initiated Working Group 38, The Atmospheric Input of Chemicals to the Ocean, in 2008. This Working Group has had four meetings. To date four peer reviewed papers have been produced from this effort, with a least eight others in the process of being written or published. This paper will discuss some of the results of the Working Group's deliberations and its plans for possible future work.

  13. Group Work with Abusive Parents.

    Science.gov (United States)

    Kruger, Lois; And Others

    1979-01-01

    Social work students conclude from an experience that parents can consider alternative means of disciplining children when they participate in a parent group that is comfortable and when attendance is promoted by provision of tangible services. Parents achieved increased sense of self-worth and learned appropriate ways of expressing anger. (Author)

  14. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  15. 77 FR 10766 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2012-02-23

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2012-N039; FXFR1334088TWG0W4-123-FF08EACT00] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders...

  16. 77 FR 74203 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2012-N266; FXFR1334088TWG0W4-123-FF08EACT00] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders...

  17. 77 FR 30314 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2012-N124: FXFR1334088TWG0W4-123-FF08EACT00] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders...

  18. 77 FR 50155 - Trinity Adaptive Management Working Group

    Science.gov (United States)

    2012-08-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-FHC-2012-N201;FXFR1334088TWG0W4-123-FF08EACT00] Trinity Adaptive Management Working Group AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: The Trinity Adaptive Management Working Group (TAMWG) affords stakeholders...

  19. Ethical Issues in the Research of Group Work

    Science.gov (United States)

    Goodrich, Kristopher M.; Luke, Melissa

    2017-01-01

    This article provides a primer for researchers exploring ethical issues in the research of group work. The article begins with an exploration of relevant ethical issues through the research process and current standards guiding its practice. Next, the authors identify resources that group work researchers can consult prior to constructing their…

  20. Group Work, Interlanguage Talk,and Second Language Acquisition.

    Science.gov (United States)

    Long, Michael H.; Porter, Patricia A.

    1985-01-01

    Discusses both the pedagogical arguments and the psycholinguistic rationale for small-group work in the second language classroom. Claims that the negotiation work possible in group actiity makes it an attractive alternative to the teacher-led discussion. Reviews research findings on interlanguage which generally support the claims made for group…

  1. Neural substrate of initiation of cross-modal working memory retrieval.

    Directory of Open Access Journals (Sweden)

    Yangyang Zhang

    Full Text Available Cross-modal working memory requires integrating stimuli from different modalities and it is associated with co-activation of distributed networks in the brain. However, how brain initiates cross-modal working memory retrieval remains not clear yet. In the present study, we developed a cued matching task, in which the necessity for cross-modal/unimodal memory retrieval and its initiation time were controlled by a task cue appeared in the delay period. Using functional magnetic resonance imaging (fMRI, significantly larger brain activations were observed in the left lateral prefrontal cortex (l-LPFC, left superior parietal lobe (l-SPL, and thalamus in the cued cross-modal matching trials (CCMT compared to those in the cued unimodal matching trials (CUMT. However, no significant differences in the brain activations prior to task cue were observed for sensory stimulation in the l-LPFC and l-SPL areas. Although thalamus displayed differential responses to the sensory stimulation between two conditions, the differential responses were not the same with responses to the task cues. These results revealed that the frontoparietal-thalamus network participated in the initiation of cross-modal working memory retrieval. Secondly, the l-SPL and thalamus showed differential activations between maintenance and working memory retrieval, which might be associated with the enhanced demand for cognitive resources.

  2. Neural substrate of initiation of cross-modal working memory retrieval.

    Science.gov (United States)

    Zhang, Yangyang; Hu, Yang; Guan, Shuchen; Hong, Xiaolong; Wang, Zhaoxin; Li, Xianchun

    2014-01-01

    Cross-modal working memory requires integrating stimuli from different modalities and it is associated with co-activation of distributed networks in the brain. However, how brain initiates cross-modal working memory retrieval remains not clear yet. In the present study, we developed a cued matching task, in which the necessity for cross-modal/unimodal memory retrieval and its initiation time were controlled by a task cue appeared in the delay period. Using functional magnetic resonance imaging (fMRI), significantly larger brain activations were observed in the left lateral prefrontal cortex (l-LPFC), left superior parietal lobe (l-SPL), and thalamus in the cued cross-modal matching trials (CCMT) compared to those in the cued unimodal matching trials (CUMT). However, no significant differences in the brain activations prior to task cue were observed for sensory stimulation in the l-LPFC and l-SPL areas. Although thalamus displayed differential responses to the sensory stimulation between two conditions, the differential responses were not the same with responses to the task cues. These results revealed that the frontoparietal-thalamus network participated in the initiation of cross-modal working memory retrieval. Secondly, the l-SPL and thalamus showed differential activations between maintenance and working memory retrieval, which might be associated with the enhanced demand for cognitive resources.

  3. Activities of the EMRAS Tritium/C14 Working Group

    International Nuclear Information System (INIS)

    Davis, P.A.; Balonov, M.; Venter, A.

    2005-01-01

    A new model evaluation program, Environmental Modeling for Radiation Safety (EMRAS), was initiated by the International Atomic Energy Agency in September 2003. EMRAS includes a working group (WG) on modeling tritium and C-14 transfer through the environment to biota and man. The main objective of this WG is to develop and test models of the uptake, formation and translocation of organically bound tritium (OBT) in food crops, animals and aquatic systems. To the extent possible, the WG is carrying out its work by comparing model predictions with experimental data to identify the modeling approaches and assumptions that lead to the best agreement between predictions and observations. Results for scenarios involving a chronically contaminated aquatic ecosystem and short-term exposure of soybeans are presently being analyzed. In addition, calculations for scenarios involving chronically contaminated terrestrial food chains and hypothetical short-term releases are currently underway, and a pinetree scenario is being developed. The preparation of datasets on tritium dynamics in large animals and fish is being encouraged, since these are the areas of greatest uncertainty in OBT modeling. These activities will be discussed in this paper

  4. Group Work in Schools: A Process Consultation Approach

    Science.gov (United States)

    Farouk, Shaalan

    2004-01-01

    This paper provides a description of how an educational psychologist can consult with groups of teachers mostly in relation to their work with pupils who display emotional behavioural difficulties. The paper includes a review of the work on group consultation in schools, followed by a description of process consultation (Schein, 1988 ) and how the…

  5. Beyond the Standard Model: Working group report

    Indian Academy of Sciences (India)

    Right-handed neutrino production in hot dense plasmas and constraints on the ... We thank all the participants of this Working Group for their all-round cooperation. The work of AR has been supported by grants from the Department of Science ...

  6. Particle physics-astrophysics working group

    International Nuclear Information System (INIS)

    Cronin, J.W.; Kolb, E.W.

    1989-01-01

    The working group met each afternoon and listened to mini-symposia on a broad range of subjects covering all aspects of particle physics---astrophysics both theoretical and experimental. This paper reports that as a result, a number of papers which follow were commissioned to reflect the present status and future prospects of the field

  7. 78 FR 21415 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2013-04-10

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning... Federal advisory committee, the AMWG, a technical work group, a Grand Canyon Monitoring and Research...

  8. Mixed Waste Focus Area Working Group: An Integrated Approach to Mercury Waste Treatment and Disposal. Revision 1

    International Nuclear Information System (INIS)

    Morris, M.I.; Conley, T.B.; Osborne-Lee, I.W.

    1997-01-01

    May 1996, the U.S. Department of Energy (DOE) Mixed Waste Focus Area (MWFA) initiated the Mercury Work Group (HgWG). The HgWG was established to address and resolve the issues associated with Mercury- contaminated mixed wastes (MWs). During the initial technical baseline development process of the MWFA, three of the top four technology deficiencies identified were related to (1) amalgamation, (2) stabilization, and (3) separation and removal for the treatment of mercury and mercury-contaminated mixed waste (MW). The HgWG is assisting the MWFA in soliciting, identifying, initiating, and managing efforts to address these needs

  9. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 12: Working group assessment team report

    International Nuclear Information System (INIS)

    1994-09-01

    The Secretary of Energy's memorandum of March 15, 1994, established an initiative for a Department-wide assessment of the ES ampersand H vulnerabilities of the inventory of plutonium (Pu) in storage. Pu in intact nuclear weapons, spent fuel and transuranic (TRU) waste not colocated with other Pu was excluded from this assessment. The DOE Plutonium Vulnerability Working Group, which was formed for this purpose and produced the Project and Assessment Plans, will also manage the overall DOE complex assessments and produce a final report for the Secretary of Energy by September 30, 1994. The Project Plan and Assessment Plan for this assessment, and which established responsibilities for personnel essential to the study, were issued on April 25, 1994. This report contains the assessment of the Pantex Plant

  10. 78 FR 7810 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning..., the AMWG, a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent...

  11. 77 FR 22801 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-04-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group...). SUMMARY: The Glen Canyon Dam Adaptive Management Work Group (AMWG) makes recommendations to the Secretary..., the AMWG, a technical work group, a Grand Canyon Monitoring and Research Center, and independent...

  12. 76 FR 24516 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2011-05-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning..., the AMWG, a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent...

  13. Organizational and individual determinants of using initiatives conducive to successful work-life balance

    OpenAIRE

    Aleksandra Andysz; Anna Najder; Dorota Merecz-Kot

    2014-01-01

    Appropriate distribution of time and energy between work and personal life poses a challenge to many working people. Unfortunately, many professionally active people experience work-family conflict. In order to minimize it, employees are offered various solutions aimed at reconciling professional and private spheres (work-life balance (WLB) initiatives). The authors attempt to answer what makes employees use WLB initiatives and what influences the decision to reject the available options. The...

  14. Working group report: Collider Physics

    Indian Academy of Sciences (India)

    11KEK, Tsukuba, Japan. 12Cornell University ... This is summary of the activities of the working group on collider physics in the IXth ... In view of the requirements of the hour and the available skills and interests, it was decided to .... The actual computation, which is long and somewhat tedious, is currently under way and is ...

  15. CEC Natural Analogue Working Group

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1989-01-01

    The central theme for the third meeting of the CEC analogue working group was ''How can analogue data be used for performance assessments, both in support of the results and for presentation to the public''. This report puts together the most recent achievements in this field, together with a review of on-going natural analogue programmes

  16. 77 FR 9265 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-02-16

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning.... L. 102-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work group...

  17. Discussions of the uranium geology working groups IGC, Sydney

    International Nuclear Information System (INIS)

    1978-01-01

    The report is divided into six working group discussions on the following subjects: 1) Chemical and physical mechanisms in the formation of uranium mineralization, geochronology, isotope geology and mineralogy; 2) Sedimentary basins and sandstone-type uranium deposits; 3) Uranium in quartz-pebble conglomerates; 4) Vein and similar type deposits (pitchblende); 5) Other uranium deposits; 6) Relation of metallogenic, tectonic and zoning factors to the origin of uranium deposits. Each working group paper contains a short introductory part followed by a discussion by the working group members

  18. Working group 4: Terrestrial

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    A working group at a Canada/USA symposium on climate change and the Arctic identified major concerns and issues related to terrestrial resources. The group examined the need for, and the means of, involving resource managers and users at local and territorial levels in the process of identifying and examining the impacts and consequences of climatic change. Climatic change will be important to the Arctic because of the magnitude of the change projected for northern latitudes; the apparent sensitivity of its terrestrial ecosystems, natural resources, and human support systems; and the dependence of the social, cultural, and economic welfare of Arctic communities, businesses, and industries on the health and quality of their environment. Impacts of climatic change on the physical, biological, and associated socio-economic environment are outlined. Gaps in knowledge needed to quantify these impacts are listed along with their relationships with resource management. Finally, potential actions for response and adaptation are presented

  19. Teaching Group Work with "The Great Debaters"

    Science.gov (United States)

    Moe, Jeffry; Autry, Linda; Olson, Joann S.; Johnson, Kaprea F.

    2014-01-01

    An experiential learning activity, based on the film "The Great Debaters" (Washington, D., 2007), was used during a group work class. Description and preliminary evaluation of the activity is provided, including analysis of participant scores on the group leader self-efficacy instrument at multiple points. Implications and future…

  20. Deliberations of working group 2: trust and the institutional framework

    International Nuclear Information System (INIS)

    Metlay, D.

    2000-01-01

    The meeting of Working Group 2 (WG-2) was preceded by two presentations in the plenary session: 'Legal and Institutional Frameworks for Government Relations with Citizens' and 'The Role and Experience of Technical Oversight Bodies'. The first identified trust and legitimacy as key resources for effective policy making and democratic governance as well as the current progress and difficulties at OECD governments' level in promoting public trust and participation. The second described the use of technical oversight bodies to provide a function of mediation between scientists, public authorities and the general public, in order to facilitate communication and understanding of technical issues and research. Dr. Aebersold gave a presentation to WG-2 on the results of Switzerland's Expert Group on Disposal Concepts for Radioactive Waste (EKRA). This group was established to bridge between nuclear power plant operators and environmental organisations, who had opposing views of radioactive waste disposal in general, and the choice of the Wellenberg site for a geological repository in particular. The success of EKRA in having its recommendations accepted and advancing the long term waste management programme was attributed to, among other things: the popular acceptance of the EKRA chairman; the competence, independence and commitment of the EKRA members; the responsiveness of their recommendations to public concerns and social issues; and the openness and transparency of their work (including broad media coverage). Dr. Metlay, who chaired WG-2, described field studies that he has undertaken dealing with trust in specific institutions in the US. This initiated the discussions, which ranged from a general understanding of the nature of trust, to why it may be important in the successful siting and development of a repository. (author)

  1. A working group for Japanese nuclear data measurement network

    International Nuclear Information System (INIS)

    Watanabe, Yukinobu

    2013-01-01

    A new working group in the Japanese Nuclear Data Committee has been established to make a cooperative network among researchers involved in nuclear data measurements and to discuss the strategy for nuclear data measurements. The working group activities are reported. (author)

  2. Proceedings of the 20th meeting of the working group on fracture mechanisms

    International Nuclear Information System (INIS)

    1988-01-01

    This volume contains 41 contributions presented at the 20th meeting of the working group on fracture mechanisms. The contributions dealt with the following topics: 1.) mechanical and test fundamentals of crack initiating corrosion processes; 2.) crack formation in water and seawater; 3.) crack formation in the process industry; 4.) hydrogen-induced crack formation; 5.) stress and crack corrosion of rustproof cast alloys; 6.) corrosion-induced crack formation at high temperatures; 7.) experimental and numerical studies on fracture behaviour. 30 contributions were separately integrated in the data base 'ENERGY'. (MM) [de

  3. Wellness works: community service health promotion groups led by occupational therapy students.

    Science.gov (United States)

    Scott, A H

    1999-01-01

    In the context of a group process course, occupational therapy students learned health promotion skills through working on personal wellness goals and leading community-based health promotion groups. The groups targeted topics such as smoking cessation, improving diet, reducing stress through yoga, meditation, tai chi chuan, ROM (Range of Motion) Dance, aerobics, and a variety of other activities. After identifying a personal wellness goal and developing it in a Wellness Awareness Learning Contract, each student used a Goal Attainment Scale (GAS) to predict an expected outcome for achieving the goal and to measure his or her progress toward attaining the goal. Students also used the GAS to measure progress in attaining group leadership skills within the community groups, which they outlined in a separate Group Skills Contract. Students kept weekly logs to foster reflective thinking, and the logs were used for interactive dialogue with the instructor. To further evaluate lifestyle change, students compared pretest and posttest scores on a Self-Assessment Scorecard, which surveyed six areas of health and human potential in body, mind, and spirit. Students monitored their own change process on both their personal health lifestyle goals and their group leadership skills while developing a richer appreciation of the dynamics of working for change with clients in community and traditional settings. Differences on the Self-Assessment Scorecard indicated improvement on two of the six scales for physical health and choices. Students experienced firsthand the challenges of developing healthier lifestyles on the basis of their personal goals as well as through fostering group changes. The two GAS learning contracts provided them with concrete evidence of their growth and learning. This experience--embedded in the context of a group process course with a community service learning group practicum--provided most students with a positive initial experience with group leadership

  4. Cold moderator test facilities working group

    International Nuclear Information System (INIS)

    Bauer, Guenter S.; Lucas, A. T.

    1997-09-01

    The working group meeting was chaired by Bauer and Lucas.Testing is a vital part of any cold source development project. This applies to specific physics concept verification, benchmarking in conjunction with computer modeling and engineering testing to confirm the functional viability of a proposed system. Irradiation testing of materials will always be needed to continuously extend a comprehensive and reliable information database. An ever increasing worldwide effort to enhance the performance of reactor and accelerator based neutron sources, coupled with the complexity and rising cost of building new generation facilities, gives a new dimension to cold source development and testing programs. A stronger focus is now being placed on the fine-tuning of cold source design to maximize its effectiveness in fully exploiting the facility. In this context, pulsed spallation neutron sources pose an extra challenge due to requirements regarding pulse width and shape which result from a large variety of different instrument concepts. The working group reviewed these requirements in terms of their consequences on the needs for testing equipment and compiled a list of existing and proposed facilities suitable to carry out the necessary development work.

  5. Group Work Education in Social Work: A Review of the Literature Reveals Possible Solutions

    Science.gov (United States)

    LaRocque, Sarah E.

    2017-01-01

    This article examines the growing concerns in the literature that traditional group work education in social work is not providing the foundational knowledge, skills, evidence-based practice, professional uses of self, and adherence to practice standards necessary for effective group practice. An exploration of the best available evidence on group…

  6. Report of the Working Group on Publicity and Funding

    DEFF Research Database (Denmark)

    Gammeltoft, Peder

    2014-01-01

    The report highlights the activities of the working group in raising awareness of the need for geographical names standardization and the work of the Group of Experts, particularly in advancing the digital presence of UNGEGN, through web presence and updated Media Kit and Wikipedia presence...

  7. The Impact of Instructor's Group Management Strategies on Students' Attitudes to Group Work and Generic Skill Development

    Science.gov (United States)

    Natoli, Riccardo; Jackling, Beverley; Seelanatha, Lalith

    2014-01-01

    This paper examines the influence of two distinct group work management strategies on finance students' attitudes towards group work and their perceptions of generic skill development. Using quantitative and qualitative data, comparisons are made between students who experienced a supportive group work environment and students who experienced an…

  8. Historic Radio Astronomy Working Group

    Science.gov (United States)

    2007-06-01

    This special issue of Astronomische Nachrichten contains the proceedings of a session of the Historic Radio Astronomy Working Group of the International Astronomical Union that took place during the 26th General Assembly of the IAU in Prague on 17th August 2006. In addition to the talks presented in Prague some contributions were solicited to give a more complete overview of `The Early History of European Radio Astronomy'.

  9. Report of the tunnel safety working group

    International Nuclear Information System (INIS)

    Gannon, J.

    1991-04-01

    On 18 February 1991 the Project Manager formed a working group to address the safety guidelines and requirements for the underground facilities during the period of accelerator construction, installation, and commissioning. The following report summarizes the research and discussions conducted by the group and the recommended guidelines for safety during this phase of the project

  10. Test Blanket Working Group's recent activities

    International Nuclear Information System (INIS)

    Vetter, J.E.

    2001-01-01

    The ITER Test Blanket Working Group (TBWG) has continued its activities during the period of extension of the EDA with a revised charter on the co-ordination of the development work performed by the Parties and by the JCT leading to a co-ordinated test programme on ITER for a DEMO-relevant tritium breeding blanket. This follows earlier work carried out until July 1998, which formed part of the ITER Final Design Report (FDR), completed in 1998. Whilst the machine parameters for ITER-FEAT have been significantly revised compared to the FDR, testing of breeding blanket modules remains a main objective of the test programme and the development of a reactor-relevant breeding blanket to ensure tritium fuel self-sufficiency is recognized a key issue for fusion. Design work and R and D on breeding blanket concepts, including co-operation with the other Contacting Parties of the ITER-EDA for testing these concepts in ITER, are included in the work plans of the Parties

  11. Reasons to expatriate and work outcomes of self-initiated expatriates

    DEFF Research Database (Denmark)

    Selmer, Jan; Lauring, Jakob

    2012-01-01

    influence of behaviour associated with escape from one’s previous life as a reason to expatriate on all of the studied work outcomes. Research limitations/implications – The self-developed scales measuring reasons for self-initiated expatriates to expatriate may have been inadequate to capture all relevant...... for them to expatriate. Although there may be a plethora of other requirements on job applicants, the findings of this study may be used as contributing to additional hiring criteria. Originality/value – Most of the fast growing literature on business expatriates has focused on organizational expatriates...... who have been assigned by their parent companies to the foreign location. However, there is much less research on self-initiated expatriates, who themselves have decided to expatriate to work abroad....

  12. Correlates of Early versus Later Initiation into Sex Work in Two Mexico–U.S. Border Cities

    Science.gov (United States)

    Loza, Oralia; Strathdee, Steffanie A.; Lozada, Remedios; Staines, Hugo; Ojeda, Victoria D.; Martínez, Gustavo A.; Amaro, Hortensia; Patterson, Thomas L.

    2009-01-01

    Purpose To examine correlates of early initiation into sex work in two Mexico–U.S. border cities. Methods Female sex workers (FSWs) ≥18 years without known HIV infection living in Tijuana and Ciudad Juarez who had recent unprotected sex with clients underwent baseline interviews. Correlates of initiation into sex work before age 18 were identified with logistic regression. Results Of 920 FSWs interviewed in Tijuana (N=474) and Ciudad Juarez (N=446), 9.8% (N=90) were early initiators (<18 years) into sex work. Median age of entry into sex work was 26 years (range: 6–58). After adjusting for age, compared to older initiators, early initiators were more likely to use inhalants (21.1% vs 9.6%, p=0.002), initiate sex work to pay for alcohol (36.7% vs 18.4%, p<.001), report abuse as a child (42.2% vs 18.7%, p<.0001), and they were less likely to be migrants (47.8% vs 62.3%, p=0.02). Factors independently associated with early initiation included inhalant use (adjOR=2.39), initiating sex work to pay for alcohol (adjOR=1.88) and history of child abuse (adjOR=2.92). Factors associated with later initiation included less education (adjOR=0.43 per 5-year increase), migration (adjOR=0.47), and initiating sex work for better pay (adjOR=0.44) or to support children (adjOR=0.03). Conclusions Different pathways for entering sex work are apparent among younger versus older females in the Mexico–U.S. border region. Among girls, interventions are needed to prevent inhalant use and child abuse and to offer coping skills; among older initiators, income-generating strategies, childcare, and services for migrants may help to delay or prevent entry into sex work. PMID:20123256

  13. Summary of the TeV33 working group

    International Nuclear Information System (INIS)

    Bagley, P.P.; Bieniosek, F.M.; Colestock, P.

    1996-10-01

    This summary of the TeV33 working group at Snowmass reports on work in the areas of Tevatron store parameters, the beam-beam interaction, Main Injector intensity (slip stacking), antiproton production, and electron cooling

  14. Radiation Sources Working Group Summary Report

    International Nuclear Information System (INIS)

    Fazio, Michael V.

    1999-01-01

    The Radiation Sources Working Group addressed advanced concepts for the generation of RF energy to power advanced accelerators. The focus of the working group included advanced sources and technologies above 17 GHz. The topics discussed included RF sources above 17 GHz, pulse compression techniques to achieve extreme peak power levels, component technology, technology limitations and physical limits, and other advanced concepts. RF sources included gyroklystrons, magnicons, free-electron masers, two beam accelerators, and gyroharmonic and traveling wave devices. Technology components discussed included advanced cathodes and electron guns, high temperature superconductors for producing magnetic fields, RF breakdown physics and mitigarion, and phenomena that impact source design such as fatigue in resonant structures due to pulsed RF heating. New approaches for RF source diagnostics located internal to the source were discussed for detecting plasma and beam phenomena existing in high energy density electrodynamic systems in order to help elucidate the reasons for performance limitations

  15. Radiation Sources Working Group Summary Report

    International Nuclear Information System (INIS)

    Fazio, M.V.

    1999-01-01

    The Radiation Sources Working Group addressed advanced concepts for the generation of RF energy to power advanced accelerators. The focus of the working group included advanced sources and technologies above 17 GHz. The topics discussed included RF sources above 17 GHz, pulse compression techniques to achieve extreme peak power levels, component technology, technology limitations and physical limits, and other advanced concepts. RF sources included gyroklystrons, magnicons, free-electron masers, two beam accelerators, and gyroharmonic and traveling wave devices. Technology components discussed included advanced cathodes and electron guns, high temperature superconductors for producing magnetic fields, RF breakdown physics and mitigarion, and phenomena that impact source design such as fatigue in resonant structures due to pulsed RF heating. New approaches for RF source diagnostics located internal to the source were discussed for detecting plasma and beam phenomena existing in high energy density electrodynamic systems in order to help elucidate the reasons for performance limitations. copyright 1999 American Institute of Physics

  16. NASA's Internal Space Weather Working Group

    Science.gov (United States)

    St. Cyr, O. C.; Guhathakurta, M.; Bell, H.; Niemeyer, L.; Allen, J.

    2011-01-01

    Measurements from many of NASA's scientific spacecraft are used routinely by space weather forecasters, both in the U.S. and internationally. ACE, SOHO (an ESA/NASA collaboration), STEREO, and SDO provide images and in situ measurements that are assimilated into models and cited in alerts and warnings. A number of years ago, the Space Weather laboratory was established at NASA-Goddard, along with the Community Coordinated Modeling Center. Within that organization, a space weather service center has begun issuing alerts for NASA's operational users. NASA's operational user community includes flight operations for human and robotic explorers; atmospheric drag concerns for low-Earth orbit; interplanetary navigation and communication; and the fleet of unmanned aerial vehicles, high altitude aircraft, and launch vehicles. Over the past three years we have identified internal stakeholders within NASA and formed a Working Group to better coordinate their expertise and their needs. In this presentation we will describe this activity and some of the challenges in forming a diverse working group.

  17. Report for Working Group 2

    DEFF Research Database (Denmark)

    Bjerregaard Jensen, Lotte; Thompson, Mary Kathryn

    2013-01-01

    The theme for the second working group was design education in civil and environmental engineering. Issues discussed during this meeting included the current state of the art of civil design education, the importance of civil design education, tools and techniques that can be used to build design...... competencies, the importance of balancing hard and soft skills, and the role that culture and context play and will continue to play in civil design in the future....

  18. Initiating events frequency determination

    International Nuclear Information System (INIS)

    Simic, Z.; Mikulicic, V.; Vukovic, I.

    2004-01-01

    The paper describes work performed for the Nuclear Power Station (NPS). Work is related to the periodic initiating events frequency update for the Probabilistic Safety Assessment (PSA). Data for all relevant NPS initiating events (IE) were reviewed. The main focus was on events occurring during most recent operating history (i.e., last four years). The final IE frequencies were estimated by incorporating both NPS experience and nuclear industry experience. Each event was categorized according to NPS individual plant examination (IPE) initiating events grouping approach. For the majority of the IE groups, few, or no events have occurred at the NPS. For those IE groups with few or no NPS events, the final estimate was made by means of a Bayesian update with general nuclear industry values. Exceptions are rare loss-of-coolant-accidents (LOCA) events, where evaluation of engineering aspects is used in order to determine frequency.(author)

  19. Effects of Personality on Attitudes toward Academic Group Work

    Science.gov (United States)

    Forrester, William R.; Tashchian, Armen

    2010-01-01

    This study investigated the effects of personality on attitudes toward academic group work among a sample of 225 business students. Data were collected using pre-existing scales for measuring personality and attitudes toward academic group work. Specifically, the Neo-FFI scale was used to measure the five personality dimensions of openness,…

  20. Group Work and Leadership: Perception of FCS Students

    Science.gov (United States)

    Arendt, Susan W.; Gregoire, Mary B.

    2006-01-01

    No known studies have examined the perception of family and consumer science (FCS) students related to group work in the classroom and its relationship to leadership. In this qualitative study, two groups of FCS students--hospitality management and dietetics--viewed group projects as exercises in leadership skills that had many barriers.…

  1. Group work and undergraduate accounting students: a Bourdieusian analysis

    OpenAIRE

    Teviotdale, Wilma; Clancy, David; Fisher, Roy; Hill, Pat

    2017-01-01

    This study investigated students’ views and experiences of group work in a vocationally oriented undergraduate Accounting and Finance degree course in an English post-1992 university. In this context tutors prepare students for the profession and for the workplace, and the development of team-working skills is a core element in the curriculum. This presents a significant challenge to tutors given that students commonly report an aversion to aspects of group work, including a perceived loss of...

  2. 76 FR 4365 - Renewal of the Trinity River Adaptive Management Working Group

    Science.gov (United States)

    2011-01-25

    ... Management Working Group AGENCY: Office of the Secretary, Interior. ACTION: Notice. SUMMARY: The Secretary of... Trinity River Adaptive Management Working Group (Working Group) for 2 years. The Working Group provides... stakeholders the opportunity to give policy, management, and technical input concerning Trinity River...

  3. 78 FR 5830 - Renewal of the Trinity River Adaptive Management Working Group

    Science.gov (United States)

    2013-01-28

    ... Management Working Group AGENCY: Office of the Secretary, Interior. ACTION: Notice. SUMMARY: The Secretary of... Trinity River Adaptive Management Working Group (Working Group) for 2 years. The Working Group provides... stakeholders the opportunity to give policy, management, and technical input concerning Trinity River...

  4. Married Thai Working Mothers: Coping with Initial Part-Time Doctoral Study

    Science.gov (United States)

    Thinnam, Thanit

    2011-01-01

    Advanced educational attainment can "grow" a career. But acquiring a doctoral qualification adds study to existing work and family responsibilities, especially for women. This phenomenological research explores the experiences of eight Thai working mothers enrolled in the initial stage of part-time doctoral programs in Thailand. A…

  5. GGOS working group on ground networks and communications

    Science.gov (United States)

    Pearlman, M.; Altamimi, Z.; Beck, N.; Forsberg, R.; Gurtner, W.; Kenyon, S.; Behrend, D.; Lemoine, F. G.; Ma, C.; Noll, C. E.; hide

    2005-01-01

    Activities of this Working Group include the investigation of the status quo and the development of a plan for full network integration to support improvements in terrestrial reference frame establishment and maintenance, Earth orientation and gravity field monitoring, precision orbit determination, and other geodetic and gravimetric applications required for the long-term observation of global change. This integration process includes the development of a network of fundamental stations with as many co-located techniques as possible, with precisely determined intersystem vectors. This network would exploit the strengths of each technique and minimize the weaknesses where possible. This paper discusses the organization of the working group, the work done to date, and future tasks.

  6. Working group on a database for cold moderators

    International Nuclear Information System (INIS)

    Broome, T. A.

    1997-09-01

    The working group meeting was chaired by Broome. The working group was charged with the task: Gather a table of neutronic performance known for specific designs; operational, test, theoretical/calculated. Set up generation of a (very briefly) annotated bibliography on this topic. A joint meeting with the Working Group on Moderator Performance Measurements was held to define the data on cold moderators which should be contained in the data base. It became clear that there exists only a small amount of data in very different forms much of it incomplete in its detail. So, rather than spending time collating existing data, it was considered to be more generally profitable to concentrate on the specification of the database and its implementation. The aim was to propose a system which could start quickly and simply yet be capable of extension and development in the future. The system was outlined in the summary session of the workshop and agreed by the participants.

  7. Working Group on Isotopes in Hydrology, Grenoble, October 1965

    International Nuclear Information System (INIS)

    1966-08-01

    The purpose of this Working Group organised by the International Atomic Energy Agency, which met at the Centre d'Etudes Nucleaires in Grenoble by invitation of the French Atomic Energy Commission, was to provide an opportunity for the different groups engaged upon the use of isotope techniques in hydrology to discuss their present work and indicate the main lines of future work. In accordance with the decision of the meeting, members of the Section of Hydrology of the Agency have prepared this report based on written contributions submitted by participants of the meeting and on the discussions which took place. It is hoped that this report will be of interest not only to groups engaged in this work but also to hydrologists wishing to know what types of studies are in progress and where they are being carried

  8. Summary muon detection working group

    International Nuclear Information System (INIS)

    Stanton, N.R.

    1993-01-01

    The areas of concentration of the Muon Working Group reflected its composition: about half of the group was interested primarily is extending the capability of existing general purpose colliders (CDF, D0). Smaller numbers of people were interested in B physics with general purpose colliders at the SSC and LHC, with SSC fixed target experiments, and with dedicated forward colliders. Good muon tagging, and possibly also muon triggering, is essential for studying CP violation in B i →J/ψX, J/ψ→μ + μ - ; as a flavor tag, with the semimuonic decay B→μ + X or bar B→μ - X tagging the flavor of the partner; for studying the physics of the semimuonic B decays themselves; and for looking for really rare decays like B→μ + μ -

  9. Initial Career and Work Meanings in Seven European Countries.

    Science.gov (United States)

    Claes, Rita; Quintanilla, S. Antonio R.

    1994-01-01

    Explores initial careers of two target groups of young adults in seven European countries. Career patterns were constructed through cluster analysis on data gathered via self-report. Six career patterns were identified. Offers suggestions for further research and implications for career counseling, career education, and organizational career…

  10. Working through a psychotherapy group's political cultures.

    Science.gov (United States)

    Ettin, Mark F; Cohen, Bertram D

    2003-10-01

    Macropolitical evolution, starting with authoritarian monarchism, has moved through anarchistic transitions either to the totalitarianism of fascism and communism or to liberal and social democracy. We posit analogous micropolitical development in process-oriented therapy groups: "dependence" and "counterdependence" corresponding to monarchism and anarchism; and "independence" and "interdependence" to liberal and social democracy, respectively. Transition from counterdependence to independence and interdependence may be: (1) facilitated through group members' cooperative experience of rebellion, or (2) blocked by collective identification, the internalization of dystopian or utopian fantasies that coalesce as "group-self" perceptions. We explore how group therapists work clinically with and through these several "political cultures" in the service of group and self transformation.

  11. Nuclear Forensics: Report of the AAAS/APS Working Group

    Science.gov (United States)

    Tannenbaum, Benn

    2008-04-01

    This report was produced by a Working Group of the American Physical Society's Program on Public Affairs in conjunction with the American Association for the Advancement of Science Center for Science, Technology and Security Policy. The primary purpose of this report is to provide the Congress, U.S. government agencies and other institutions involved in nuclear forensics with a clear unclassified statement of the state of the art of nuclear forensics; an assessment of its potential for preventing and identifying unattributed nuclear attacks; and identification of the policies, resources and human talent to fulfill that potential. In the course of its work, the Working Group observed that nuclear forensics was an essential part of the overall nuclear attribution process, which aims at identifying the origin of unidentified nuclear weapon material and, in the event, an unidentified nuclear explosion. A credible nuclear attribution capability and in particular nuclear forensics capability could deter essential participants in the chain of actors needed to smuggle nuclear weapon material or carry out a nuclear terrorist act and could also encourage states to better secure such materials and weapons. The Working Group also noted that nuclear forensics result would take some time to obtain and that neither internal coordination, nor international arrangements, nor the state of qualified personnel and needed equipment were currently enough to minimize the time needed to reach reliable results in an emergency such as would be caused by a nuclear detonation or the intercept of a weapon-size quantity of material. The Working Group assesses international cooperation to be crucial for forensics to work, since the material would likely come from inadequately documented foreign sources. In addition, international participation, if properly managed, could enhance the credibility of the deterrent effect of attribution. Finally the Working Group notes that the U.S. forensics

  12. UTM Data Working Group Demonstration 1: Final Report

    Science.gov (United States)

    Rios, Joseph L.; Mulfinger, Daniel G.; Smith, Irene S.; Venkatesan, Priya; Smith, David R.; Baskaran, Vijayakumar; Wang, Leo

    2017-01-01

    This document summarizes activities defining and executing the first demonstration of the NASA-FAA Research Transition Team (RTT) Data Exchange and Information Architecture (DEIA) working group (DWG). The demonstration focused on testing the interactions between two key components in the future UAS Traffic Management (UTM) System through a collaborative and distributed simulation of key scenarios. The summary incorporates written feedback from each of the participants in the demonstration. In addition to reporting the activities, this report also provides some insight into future steps of this working group.

  13. Commission 41 Working Group on Astronomy and World Heritage

    Science.gov (United States)

    Ruggles, Clive; Wolfschmidt, Gudrun; Badolati, Ennio; Batten, Alan; Belmonte, Juan; Bhathal, Ragbir; Brosche, Peter; Dbarbat, Suzanne; DeVorkin, David; Duerbeck, Hilmar W.; Epifania, Priscilla; Ferlet, Roger; Funes, Jos; Glass, Ian S.; Griffin, Elizabeth; Gurshtein, Alexander; Hearnshaw, John; Helou, George; Hidayat, Bambang; Hockey, Thomas; Holbrook, Jarita; Incerti, Manuela; Kepler, S. O.; Kochhar, Rajesh; Krupp, Edwin C.; Locher, Kurt; Maglova-Stoeva, Penka; Mickaelian, Areg; Pettersen, Bjorn R.; Pineda de Caras, Mara Cristina; Pinigin, Gennadiy; Pompeia, Luciana; Pozhalova, Zhanna; Yun-li, Shi; Simonia, Irakli; Le Guet Tully, Francoise; Wainscoat, Richard

    2010-05-01

    What follows is a short report on the Business Meeting of the Astronomy and World Heritage Working Group held on Thursday August 6, 2009. This was the first formal Business Meeting of the Working Group since its formation following the signing of the Memorandum of Understanding between the IAU and UNESCO on Astronomy and World Heritage in October 2008.

  14. 77 FR 25150 - GPS Satellite Simulator Working Group; Notice of Meeting

    Science.gov (United States)

    2012-04-27

    ... DEPARTMENT OF DEFENSE Department of the Air Force GPS Satellite Simulator Working Group; Notice of Meeting AGENCY: The United States Air Force, DoD. ACTION: Amending GPS Simulator Working group Meeting Notice. SUMMARY: We are requesting to amend the date of the GPS Simulator Working group meeting notice...

  15. Working Group 3: Broader Perspectives on Non-proliferation and Nuclear Verification

    International Nuclear Information System (INIS)

    Dreicer, M.; Pregenzer, A.; Stein, G.

    2013-01-01

    This working group (WG) focused on the technical topics related to international security and stability in global nonproliferation and arms control regimes and asked how nonproliferation tools and culture might facilitate verification of future nuclear treaties. The review of existing and future nonproliferation and disarmament regimes (Comprehensive Test Ban Treaty - CTBT, UNSC Resolution 1540, UK/Norway/VERTIC exercise, Fissile Material Cut-off Treaty - FMCT) offered a view on challenges, possibilities, and limitations for future initiatives. The concepts that the WG considered, with potential use in implementing future nuclear verification treaties, are: Triple S Culture (Safety, Security, Safeguards), State-Level Approach, Safeguards-by-Design, risk-based approaches, managed access, inspections, and protection of sensitive information. Under these concepts, many existing tools, considered by the WG could be used for nuclear verification. Export control works to control sensitive technology and expertise. Global implementation is complicated and multi-faceted and would benefit from greater consistency and efficiency. In most cases, international cooperation and development international capability would supplement efforts. This document is composed of the slides and the paper of the presentation. (A.C.)

  16. Do work-place initiated measures reduce sickness absence? Preventive measures and sickness absence among older workers in Norway.

    Science.gov (United States)

    Midtsundstad, Tove I; Nielsen, Roy A

    2014-03-01

    The article examines whether preventive measures and work adjustments at the establishment level affects sickness absence among workers aged 50 years and older. We combine survey data from a representative sample of 713 Norwegian companies, mapping the prevalence of preventive health measures in the work place in 2005, with register data on sickness absence and demographic variables for workers aged 50 years or older in 2001 and 2007. By means of a difference-in-differences approach, we compare changes and differences in the likelihood of sickness absence among the sample group, with and without the various measures/ instruments in 2005 respectively. In general, work-place preventive measures at the establishment level have not contributed to reducing the probability for sickness absence among workers aged 50 years and older. However, analyses comparing differences between industries find that the work-place measures have had a positive effect on public administration employees. Whether work-place preventive initiatives influence levels of sickness absence seems to be contingent on sector and industry. Therefore, work-place measures may be more effective in the public administration sector where most employees have office jobs compared to sectors such as manufacturing, construction and transportation, where many employees have manual work and more physical demanding jobs. Work-place initiatives thus seem to have less effect on preventing sickness absence in sectors dominated by manual labour.

  17. Mixed Waste Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    The treatment of mixed waste remains one of this country's most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country's largest mixed waste generator, responsible for 95 percent of the Nation's mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE's earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies

  18. Standardization activities of the Euratom Neutron Radiography Working Group

    International Nuclear Information System (INIS)

    Domanus, J.

    1982-06-01

    In 1979 a working group on neutron radiography was formed at Euratom. The purpose of this group is the standardization of neutron radiographic methods in the field of nuclear fuel. Activities of this Neutron Radiography Working Group are revised. Classification of defects revealed by neutron radiography is illustrated in a special atlas. Beam purity and sensitivity indicators are tested together with a special calibration fuel pin. All the Euratom neutron radiography centers will perform comparative neutron radiography with those items. The measuring results obtained, using various measuring aparatus will form the basis to formulate conclusions about the best measuring methods and instruments to be used in that field. Besides the atlas of neutron radiographic findings in light water reactor fuel, the Euratom Neutron Radiogrphy Working Group has published a neutron radiography handbook in which the neutron radiography installations in the European Community are also described. (author)

  19. Working group 4B - human intrusion: Design/performance requirements

    International Nuclear Information System (INIS)

    Channell, J.

    1993-01-01

    There is no summary of the progress made by working group 4B (Human Intrusion: Design/performance Requirements) during the Electric Power Research Institute's EPRI Workshop on the technical basis of EPA HLW Disposal Criteria, March 1993. This group was to discuss the waste disposal standard, 40 CFR Part 191, in terms of the design and performance requirements of human intrusion. Instead, because there were so few members, they combined with working group 4A and studied the three-tier approach to evaluating postclosure performance

  20. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 10: Sandia National Laboratories - New Mexico working group assessment team report

    International Nuclear Information System (INIS)

    1994-09-01

    The Secretary of Energy's memorandum of March 15, 1994, established an initiative for a Department-wide assessment of the vulnerabilities of the inventory of plutonium in storage. Plutonium in intact nuclear weapons and spent fuel were excluded from this study. The DOE Plutonium Vulnerability Working Group, which was formed for this purpose and produced the Project and Assessment Plans, will also manage the open-quote snap-shot close-quote assessments and produce a final report for the Secretary by September 30, 1994. The Project Plan and Assessment Plan to accomplish this study, and which established responsibilities for personnel essential to the study, were issued on April 25, 1994

  1. 'Optimal conditions for group-dynamic challenges' : The results of mock-up research on group-dynamics during the January 2014 Juuka Finland ‘Ice Dome’ building by university students initiated by the Eindhoven Technical University

    NARCIS (Netherlands)

    Sanders, F.C.; Overtoom, M.E.

    2016-01-01

    Society counts a growing number of group-dynamic challenges like civilian movements, resident initia-tive, self steering teams on the work floor and innovation team challenges. The basis driving force is governments that draw back, increasing competition in business and empowerment of people.

  2. Summary of the polarized beam working group

    International Nuclear Information System (INIS)

    Wienands, U.; Dyck, O. van.

    1989-05-01

    The polarized beam working group reviewed the AGS Bookster and TRIUMF KAON Factory facilities, heard an overview of the subject of siberian snakes, discussed internal polarized gas targets, and made recommendations for further study

  3. Recent and current activities of the OECD/NEA Working Group on Fuel Safety (NEA/CSNI). Recent and Current Activities of the Working Group on Fuel Safety (NEA/CSNI)

    International Nuclear Information System (INIS)

    Petit, Marc

    2013-01-01

    The Working Group on Fuel Safety (WGFS) is part of the Committee on the Safety of Nuclear Installations (CSNI) of the Nuclear Energy Agency and has the main mission of advancing the current understanding and addressing fuel safety issues. Recent and current activities of the working group have addressed mainly the loss of coolant accident (LOCA), the reactivity initiated accident (RIA), the fuel safety criteria and leaking fuel issues, as well as Fukushima-related fuel topics. In the area of LOCA, the group issued different documents, the most notable being a very comprehensive state of the art report [NEA/CSNI/R (2009)15]. Regarding RIA, some documents were finalised and issued in the recent years, as well as a state of the art report [NEA/CSNI/R (2010)1]. The question of leaking fuel and how it is handled in the reactors is an activity that is just starting. Of particular interest to people developing new fuel concepts is the Nuclear Fuel Safety Criteria Technical Review - Second Edition [NEA/CSNI/R (2012)3]. This document provides a broad overview of the numerous criteria used in the NEA member countries to demonstrate to safe use of fuel in light water reactors. The WGFS has started discussions about fuel related issues raised by the Fukushima accident, in particular, hydrogen production. New concepts have been proposed to solve these issues but it appears that these concepts will need to go through a long qualification process to assess their adequacy for the different situations considered in the evaluation of fuel safety, from normal operation to accident conditions

  4. Regional cooperation-activities of the working group on waste management

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1987-01-01

    A Working Group on Waste Management was formally established by the Pacific Basin Nuclear Cooperation Committee at its meeting on November 19, 1986. Co-chairmen are Dr. Kunihiko Uematsu of Japan and the author, Gordon L. Brooks of Canada. Since the Working Group is newly formed, a consensus program has not yet been developed. In lieu of this, the author suggests a series of basic issues and possible areas of future collaboration which could serve as a starting point for the Working Group in developing an appropriate cooperative program. (author)

  5. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  6. Report of the Working Group on Publicity and Funding

    DEFF Research Database (Denmark)

    Gammeltoft, Peder

    2017-01-01

    The report presents the aims and activities of the working group and in its efforts with raising awareness of the need for geographical names standardization and the work of the Group of Experts, through presence on the web and social media and Media Kit. The report also highlights efforts to find...... financial support for training and for representatives from developing countries attending UNSCGN Conferences and UNGEGN Sessions....

  7. The effects of conflict asymmetry on work group and individual outcomes

    NARCIS (Netherlands)

    Jehn, K.A.; Rispens, S.; Thatcher, S.M.B.

    2010-01-01

    We examine the consequences of an often ignored aspect of work group conflict—asymmetric conflict perceptions—for the effectiveness of individuals and groups. Tests of our multilevel hypotheses using data on 51 work groups showed that group conflict asymmetry (the degree to which members differ in

  8. Working group report: Cosmology and astroparticle physics

    Indian Academy of Sciences (India)

    This is the report of the cosmology and astroparticle physics working group at ... discussions carried out during the workshop on selected topics in the above fields. ... Theoretical Physics Division, Physical Research Laboratory, Navrangpura, ...

  9. Background and future activities of PBNCC's nuclear training working group

    International Nuclear Information System (INIS)

    Rieh, C.H.; Chung, K.; Hamlin, K.W.

    1988-01-01

    This paper presents a review of the background and activities of the nuclear training working group of the Pacific Basin Nuclear Cooperation Committee. The working group has examined various mechanisms for regional cooperation including the development of a regional catalog of training programs and the conceptualization of sharing training facilities among nuclear operators in the region. The working group has focused its attention on the exchange of information on the on-going training programs, operator training facilities, available resources for training assistance and proposed cooperative schemes. These activities are expected to continue and will provide invaluable information for nuclear power programs in the Pacific Basin region. The group also reviewed problems and issues associated with developing regional cooperation

  10. Background and future activities of PBNCC's nuclear training working group

    International Nuclear Information System (INIS)

    Chong Hun Rieh; Kunmo Chung; Hamlin, K.W.

    1987-01-01

    This paper presents a review of the background and activities of the nuclear training working group of the Pacific Basin Nuclear Cooperation Committee. The working group has examined various mechanisms for regional cooperation including the development of aregional catalog of training programs and the conceptualization of sharing training facilities among nuclear operators in the region. The working group has focused its attention on the exchange of information on the on-going training programs, operator training facilities, available resources for training assistance and proposed cooperative schemes. These activities are expected to continue and will provide invaluable information for nuclear power programs in the Pacific Basin region. The group also reviewed problems and issues associated with developing regional cooperation. (author)

  11. Improving tsunami resiliency: California's Tsunami Policy Working Group

    Science.gov (United States)

    Real, Charles R.; Johnson, Laurie; Jones, Lucile M.; Ross, Stephanie L.; Kontar, Y.A.; Santiago-Fandiño, V.; Takahashi, T.

    2014-01-01

    California has established a Tsunami Policy Working Group to facilitate development of policy recommendations for tsunami hazard mitigation. The Tsunami Policy Working Group brings together government and industry specialists from diverse fields including tsunami, seismic, and flood hazards, local and regional planning, structural engineering, natural hazard policy, and coastal engineering. The group is acting on findings from two parallel efforts: The USGS SAFRR Tsunami Scenario project, a comprehensive impact analysis of a large credible tsunami originating from an M 9.1 earthquake in the Aleutian Islands Subduction Zone striking California’s coastline, and the State’s Tsunami Preparedness and Hazard Mitigation Program. The unique dual-track approach provides a comprehensive assessment of vulnerability and risk within which the policy group can identify gaps and issues in current tsunami hazard mitigation and risk reduction, make recommendations that will help eliminate these impediments, and provide advice that will assist development and implementation of effective tsunami hazard risk communication products to improve community resiliency.

  12. Working Group Report: Higgs Boson

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Sally; Gritsan, Andrei; Logan, Heather; Qian, Jianming; Tully, Chris; Van Kooten, Rick [et al.

    2013-10-30

    This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $CP$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities from detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).

  13. IMIA Working Group 15 : Technology assessment and quality development in health informatics

    NARCIS (Netherlands)

    Gennip, E.M.S.J. van

    1999-01-01

    The working group on technology assessment and quality development in health informatics was established as a follow-up to the recommendations made at the IMIA-ISTAHC working conference in 1990. The working group was approved by the IMIA General Assembly at Kyoto, September, 1993. The working group

  14. Investigating the Effectiveness of Group Work in Mathematics

    Science.gov (United States)

    Sofroniou, Anastasia; Poutos, Konstantinos

    2016-01-01

    Group work permits students to develop a range of critical thinking, analytical and communication skills; effective team work; appreciation and respect for other views, techniques and problem-solving methods, all of which promote active learning and enhance student learning. This paper presents an evaluation of employing the didactic and…

  15. Group work in higher education: a mismanaged evil or a potential ...

    African Journals Online (AJOL)

    Theoretically speaking, group work has a wealth of potential to offer to the lecturer and the learner. The complexity of the phenomenon leaves the lecturer with no choice but to take great care in the use of group work. The fact that group work is not viewed as a mismanaged evil leaves the door open for further use of this ...

  16. Summary Report of Working Group 7: Muon Colliders and Advanced Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Nagaitsev, Sergei [Fermilab; Berg, J.Scott [Brookhaven

    2012-07-01

    The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

  17. 75 FR 21602 - Online Safety and Technology Working Group Meeting

    Science.gov (United States)

    2010-04-26

    ... OSTWG is tasked with evaluating industry efforts to promote a safe online environment for children. The... and Technology Working Group Meeting AGENCY: National Telecommunications and Information... public meeting of the Online Safety and Technology Working Group (OSTWG). DATES: The meeting will be held...

  18. Working group 8: inspection tools

    Energy Technology Data Exchange (ETDEWEB)

    Billey, Deb; Kania, Richard; Nickle, Randy; Wang, Rick; Westwood, Stephen

    2011-07-01

    This eighth working group of the Banff 2011 conference discussed the inspection tools and techniques used by the upstream and downstream pipeline industry to evaluate pipeline integrity. Special attention was given to the challenges and successes related to in-line inspection (ILI) technology. The background of current dent assessment criteria in B31.8 was presented, including dent definition for ILI vendors and pipeline operators as well as codes (CSA Z662 and B31.8). The workshop described examples of dents and assessments showing inconsistency with current criteria as set out by TCPL and Marathon. This workshop produced a single, industry-wide definition of the dent. It was found that the strain based criteria were more practical because depth based is conservative and may miss shallow occurrences. The creation of joint industry group was proposed to develop strain based criteria for incorporation into CSAZ662 and B31.8.

  19. Working group report: Cosmology and astroparticle physics

    Indian Academy of Sciences (India)

    This is the report of the cosmology and astroparticle physics working group ... origin of the accelerating Universe: Dark energy and particle cosmology by Y-Y Keum, .... Neutrino oscillations with two and three mass varying supernova neutrinos ...

  20. Eastern and Southern Africa Seismological Working Group

    International Nuclear Information System (INIS)

    Ogubazghi, G.

    2002-01-01

    Member countries of the Eastern and Southern Africa Seismologica Working Group are listed. The presentation also gives the objectives, activities, date of birth and sponsors of the said ESARSWG. Areas of possible cooperation with CTBTO are indicated

  1. Core outcome sets in dermatology: report from the second meeting of the International Cochrane Skin Group Core Outcome Set Initiative.

    Science.gov (United States)

    Kottner, J; Jacobi, L; Hahnel, E; Alam, M; Balzer, K; Beeckman, D; Busard, C; Chalmers, J; Deckert, S; Eleftheriadou, V; Furlan, K; Horbach, S E R; Kirkham, J; Nast, A; Spuls, P; Thiboutot, D; Thorlacius, L; Weller, K; Williams, H C; Schmitt, J

    2018-04-01

    Results of clinical trials are the most important information source for generating external clinical evidence. The use of different outcomes across trials, which investigate similar interventions for similar patient groups, significantly limits the interpretation, comparability and clinical application of trial results. Core outcome sets (COSs) aim to overcome this limitation. A COS is an agreed standardized collection of outcomes that should be measured and reported in all clinical trials for a specific clinical condition. The Core Outcome Set Initiative within the Cochrane Skin Group (CSG-COUSIN) supports the development of core outcomes in dermatology. In the second CSG-COUSIN meeting held in 2017, 11 COS development groups working on skin diseases presented their current work. The presentations and discussions identified the following overarching methodological challenges for COS development in dermatology: it is not always easy to define the disease focus of a COS; the optimal method for outcome domain identification and level of detail needed to specify such domains is challenging to many; decision rules within Delphi surveys need to be improved; appropriate ways of patient involvement are not always clear. In addition, there appear to be outcome domains that may be relevant as potential core outcome domains for the majority of skin diseases. The close collaboration between methodologists in the Core Outcome Set Initiative and the international Cochrane Skin Group has major advantages for trialists, systematic reviewers and COS developers. © 2018 British Association of Dermatologists.

  2. Did our current initial treatment practice change after EAU/ESPU vesicoureteral reflux risk grouping?

    Science.gov (United States)

    Tokat, Eda; Gurocak, Serhat; Ure, Iyimser; Acar, Cenk; Sınık, Zafer; Tan, Mustafa Ozgur

    2018-06-02

    The "European Association of Urology (EAU) Guidelines on Vesicoureteral Reflux (VUR) in Children (September 2012)" established risk classification by analyzing and defining risk factors for each patient. In this study we aimed to investigate how our initial treatment procedures were affected by EAU/ESPU guideline vesicoureteral reflux risk grouping and to compare the early clinical results of treatments performed before and after the risk classification in our patients with VUR. 334 renal units with regular clinical follow-up who were treated owing to VUR (vesicoureteral reflux) between years 2009 and 2017 were retrospectively reviewed. Preoperative clinical parameters such as grade and laterality of reflux, presence of renal scar, initial and follow-up treatments, findings of medical treatment and surgical procedures were analyzed. The initial medical and surgical methods were compared by categorizing patients according to risk groups before and after 2013. Mean age and follow-up duration were 71.4(6-216) months and 47(4-141) months, respectively. Among the preoperative parameters, only high EAU risk group (p = 0.01) and treating lower urinary tract symptoms (p age, sex, and presence of renal scar at DMSA were not affecting the success of treatment significantly. While no significant difference in medical and surgical treatment rates is observed after risk grouping system in low risk group, the percentages of patients who are treated with surgical methods initially were significantly decreased in moderate and high risk groups (p = 0.002 and p = 0.012, respectively). We determined that VUR risk grouping did not change clinical success significantly in all risk groups. Despite the fact that EAU/ESPU VUR risk classification changed our current practice in terms of initial treatment method, this different approach did not seem to affect early clinical success positively. There is still an absolute need for studies with larger sample size and long

  3. 75 FR 1338 - Online Safety and Technology Working Group Meeting

    Science.gov (United States)

    2010-01-11

    ... promote a safe online environment for children. The Act requires the OSTWG to report its findings and... and Technology Working Group Meeting AGENCY: National Telecommunications and Information... public meeting of the Online Safety and Technology Working Group (OSTWG). DATES: The meeting will be held...

  4. 77 FR 20789 - Work Group on Measuring Systems for Taxis

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology Work Group on Measuring.... SUMMARY: The National Institute of Standards and Technology (NIST) is forming a Work Group (WG) to develop... states in laws, regulations, methods, and testing equipment that comprises the regulatory control of...

  5. Summary of the Linear Collider Working Group

    International Nuclear Information System (INIS)

    Ruth, R.D.

    1989-01-01

    The focus of the Linear Collider Working Group was on a next generation linear collider. Topics discussed are: parameters; damping rings; bunch compression and pre-acceleration; linac; final focus; and multibunch effects. 8 refs., 3 figs., 7 tabs

  6. Modelling the exposure of wildlife to radiation: key findings and activities of IAEA working groups

    Energy Technology Data Exchange (ETDEWEB)

    Beresford, Nicholas A. [NERC Centre for Ecology and Hydrology, Lancaster Environment Center, Library Av., Bailrigg, Lancaster, LA1 4AP (United Kingdom); School of Environment and Life Sciences, University of Salford, Manchester, M4 4WT (United Kingdom); Vives i Batlle, Jordi; Vandenhove, Hildegarde [Belgian Nuclear Research Centre, Belgian Nuclear Research Centre, Boeretang 200, 2400 Mol (Belgium); Beaugelin-Seiller, Karine [Institut de Radioprotection et de Surete Nucleaire (IRSN), PRP-ENV, SERIS, LM2E, Cadarache (France); Johansen, Mathew P. [ANSTO Australian Nuclear Science and Technology Organisation, New Illawarra Rd, Menai, NSW (Australia); Goulet, Richard [Canadian Nuclear Safety Commission, Environmental Risk Assessment Division, 280 Slater, Ottawa, K1A0H3 (Canada); Wood, Michael D. [School of Environment and Life Sciences, University of Salford, Manchester, M4 4WT (United Kingdom); Ruedig, Elizabeth [Department of Environmental and Radiological Health Sciences, Colorado State University, Fort Collins (United States); Stark, Karolina; Bradshaw, Clare [Department of Ecology, Environment and Plant Sciences, Stockholm University, SE-10691 (Sweden); Andersson, Pal [Swedish Radiation Safety Authority, SE-171 16, Stockholm (Sweden); Copplestone, David [Biological and Environmental Sciences, University of Stirling, Stirling, FK9 4LA (United Kingdom); Yankovich, Tamara L.; Fesenko, Sergey [International Atomic Energy Agency, Vienna International Centre, 1400, Vienna (Austria)

    2014-07-01

    In total, participants from 14 countries, representing 19 organisations, actively participated in the model application/inter-comparison activities of the IAEA's EMRAS II programme Biota Modelling Group. A range of models/approaches were used by participants (e.g. the ERICA Tool, RESRAD-BIOTA, the ICRP Framework). The agreed objectives of the group were: 'To improve Member State's capabilities for protection of the environment by comparing and validating models being used, or developed, for biota dose assessment (that may be used) as part of the regulatory process of licensing and compliance monitoring of authorised releases of radionuclides.' The activities of the group, the findings of which will be described, included: - An assessment of the predicted unweighted absorbed dose rates for 74 radionuclides estimated by 10 approaches for five of the ICRPs Reference Animal and Plant geometries assuming 1 Bq per unit organism or media. - Modelling the effect of heterogeneous distributions of radionuclides in sediment profiles on the estimated exposure of organisms. - Model prediction - field data comparisons for freshwater ecosystems in a uranium mining area and a number of wetland environments. - An evaluation of the application of available models to a scenario considering radioactive waste buried in shallow trenches. - Estimating the contribution of {sup 235}U to dose rates in freshwater environments. - Evaluation of the factors contributing to variation in modelling results. The work of the group continues within the framework of the IAEA's MODARIA programme, which was initiated in 2012. The work plan of the MODARIA working group has largely been defined by the findings of the previous EMRAS programme. On-going activities of the working group, which will be described, include the development of a database of dynamic parameters for wildlife dose assessment and exercises involving modelling the exposure of organisms in the marine coastal

  7. 78 FR 32270 - U.S. Extractive Industries Transparency Initiative Multi-Stakeholder Group (USEITI MSG) Advisory...

    Science.gov (United States)

    2013-05-29

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary [Docket No. ONRR-2012-0003; DS63600000 DR2PS0000.PX8000 134D0102R2] U.S. Extractive Industries Transparency Initiative Multi- Stakeholder Group... Transparency Initiative (USEITI) Multi- Stakeholder Group Advisory Committee. DATES: The meetings will be held...

  8. Collaborative leadership and the implementation of community-based fall prevention initiatives: a multiple case study of public health practice within community groups.

    Science.gov (United States)

    Markle-Reid, Maureen; Dykeman, Cathy; Ploeg, Jenny; Kelly Stradiotto, Caralyn; Andrews, Angela; Bonomo, Susan; Orr-Shaw, Sarah; Salker, Niyati

    2017-02-16

    Falls among community-dwelling older adults are a serious public health concern. While evidence-based fall prevention strategies are available, their effective implementation requires broad cross-sector coordination that is beyond the capacity of any single institution or organization. Community groups comprised of diverse stakeholders that include public health, care providers from the public and private sectors and citizen volunteers are working to deliver locally-based fall prevention. These groups are examples of collective impact and are important venues for public health professionals (PHPs) to deliver their mandate to work collaboratively towards achieving improved health outcomes. This study explores the process of community-based group work directed towards fall prevention, and it focuses particular attention on the collaborative leadership practices of PHPs, in order to advance understanding of the competencies required for collective impact. Four community groups, located in Ontario, Canada, were studied using an exploratory, retrospective, multiple case study design. The criteria for inclusion were presence of a PHP, a diverse membership and the completion of an initiative that fit within the scope of the World Health Organization Fall Prevention Model. Data were collected using interviews (n = 26), focus groups (n = 4), and documents. Cross-case synthesis was conducted by a collaborative team of researchers. The community groups differed by membership, the role of the PHP and the type of fall prevention initiatives. Seven practice themes emerged: (1) tailoring to address context; (2) making connections; (3) enabling communication; (4) shaping a vision; (5) skill-building to mobilize and take action; (6) orchestrating people and projects; and (7) contributing information and experience. The value of recognized leadership competencies was underscored and the vital role of institutional supports was highlighted. To align stakeholders working

  9. Working group report: Collider and B physics

    Indian Academy of Sciences (India)

    The activities of the working group including some of the seminars are summarized. The written ... The search for supersymmetry at future colliders also received a lot of attention. It is believed that ..... Then the kinematic regions can be divided.

  10. Recommendations of the AIRP-SEFP-SFPR working group individual radiological monitoring document-dosimetric data base

    International Nuclear Information System (INIS)

    Litido, M.; Busuoli, G.; Pelliccioni, M.; Iniiguez Saez, J.; Dollo, R.

    1996-01-01

    On the initiative of the chairmen of the three radiation protection societies (Italian, French, Spanish), it has been decided to extend the study carried out at TAORMINA (Sicily, Italy) joint conference on the harmonization of radiation protection practices. In order to formulate proposals on this topic, a working group was created at the end of 1993 made up of representatives of each society, with the objective of harmonizing the individual radiological monitoring documents and methods of recording and managing dosimetric information in data banks. (author)

  11. Division X, XII / Commission 40, 41 / Working Group Radio Astronomy

    NARCIS (Netherlands)

    Kellermann, Kenneth; Orchiston, Wayne; Davies, Rod; Gurvits, Leonid; Ishiguro, Masato; Lequeux, James; Swarup, Govind; Wall, Jasper; Wielebinski, Richard; van Woerden, Hugo

    The IAU Working Group on Historical Radio Astronomy (WGHRA) was formed at the 2003 General Assembly of the IAU as a Joint Working Group of Commissions 40 (Radio Astronomy) and 41 (History of Astronomy), in order to: a) assemble a master list of surviving historically-significant radio telescopes and

  12. Teachers’ perceptions of their own initiative: Collective initiative vs. personal initiative

    Directory of Open Access Journals (Sweden)

    Džinović Vladimir

    2013-01-01

    Full Text Available Current trends in education demand from teachers to exhibit proactive behaviour and assume responsibility for the implementation of changes in school practice. In that sense, it is important to study how teachers perceive their own initiative and to gain insight into the activities where such initiative is demonstrated. This study has been conceived as a mixed-methods research. The qualitative study implied forming four focus groups with subject teachers and class teachers (N=38, while the quantitative study entailed surveying 1441 teachers in forty primary schools in Serbia using the questionnaire constructed based on qualitative data. Data from focus groups were processed by qualitative thematic analysis, while the questionnaire data were processed by principal component analysis and univariate analysis of variance. The findings of the study have shown that teachers mostly demonstrate initiative through co­operative activities that include planning of joint teaching as well as conducting joint projects within school and with the local community actors. Teachers are least ready to demonstrate personal initiative and the initiative aimed at accomplishing considerable changes in school work. The concluding part includes the recommendations for encouraging teachers’ personal initiative and building organizational culture that would support such initiative. [Projekat Ministarstva nauke Republike Srbije, br. br. 47008: Unapređivanje kvaliteta i dostupnosti obrazovanja u procesima modernizacije Srbije i br. 179034: Od podsticanja inicijative, saradnje i stvaralaštva u obrazovanju do novih uloga i identiteta u društvu

  13. Working Group Report: Dark Energy and CMB

    Energy Technology Data Exchange (ETDEWEB)

    Dodelson, S.; Honscheid, K.; Abazajian, K.; Carlstrom, J.; Huterer, D.; Jain, B.; Kim, A.; Kirkby, D.; Lee, A.; Padmanabhan, N.; Rhodes, J.; Weinberg, D.

    2013-09-20

    The American Physical Society's Division of Particles and Fields initiated a long-term planning exercise over 2012-13, with the goal of developing the community's long term aspirations. The sub-group "Dark Energy and CMB" prepared a series of papers explaining and highlighting the physics that will be studied with large galaxy surveys and cosmic microwave background experiments. This paper summarizes the findings of the other papers, all of which have been submitted jointly to the arXiv.

  14. For what purpose do language teachers use group work in their lessons? : A study of group work in the teaching of English, and modern languages, in a Swedish school

    OpenAIRE

    Krogstad, Amanda

    2011-01-01

    The overall aim of this study is to investigate how and why teachers in the subjects of English and Modern Languages use group work in their lessons. This has been done with the help of a survey and interviews. The results indicate that all teachers in the study use at least some group work. Group work is often used to help the students practise their verbal skills as well as in teaching them to work together. The study has also shown that teachers find some parts of using group work in their...

  15. Remarks of the SFRP working group about ICRP recommendations

    International Nuclear Information System (INIS)

    Schieber, C.; Cordoliani, Y.S.

    2005-01-01

    Remarks of the SFRP working group about ICRP recommendations. The International Commission on Radiological Protection has proposed last summer on its Web site the draft text of the 2005 ICRP recommendations for consultation. As it was done for the previous drafts, the French Society for Radiation Protection, has sent his comments to the ICRP, through a specific working group. The text sent to the ICRP is presented here to the readers of the SFRP's Journal. (author)

  16. E-Beam Driven Accelerators: Working Group Summary

    International Nuclear Information System (INIS)

    Muggli, P.; Southern California U.; Ng, J.S.T.; SLAC

    2005-01-01

    The working group has identified the parameters of an afterburner based on the design of a future linear collider. The new design brings the center of mass energy of the collider from 1 to 2 TeV. The afterburner is located in the final focus section of the collider, operates at a gradient of ∼4 GeV/m, and is only about 125 m long. Very important issues remain to be addressed, and include the physics and design of the positron side of the afterburner, as well as of the final focus system. Present plasma wakefield accelerator experiments have reached a level of maturity and of relevance to the afterburner, that make it timely to involve the high energy physics and accelerator community in the afterburner design process. The main result of this working group is the first integration of the designs of a future linear collider and an afterburner

  17. [Group psychotherapy. Working team in community psychiatry].

    Science.gov (United States)

    Quevedo, J S; Barrera, E H

    1977-01-01

    A Community Psychiatry program was begun, based on the needs and requests of a clinic (this approach is restricted because there are institutional factors that only the institution can change). The work was aimed at sensitizing the beneficiaries and change clinic factors modifiable through operative group technique. When a great deal of every day stereotypes appeared, role playing was used: as a result, people in the clinic realized how they acted and how they asked from others behaviors that they themselves found difficult to show. As results, it was found that when workers were confronted with reality, desertion from operative groups appeared, with projection of problems (them, not me), great fear of change (fantasized in different ways), group passivity and the image of the institution, that the group saw as a persecutor.

  18. Summary records of the meetings of INFCE Working Group 6

    International Nuclear Information System (INIS)

    These were 6 meetings of Working Group 6 that took place between 8 December 1977 and 7 September 1979. This document consists of the summaries of those meetings and it reports on the objectives of the Working Group, the participants, the guidelines for the study, and the outline of the final report

  19. Space Interferometry Science Working Group

    Science.gov (United States)

    Ridgway, Stephen T.

    1992-12-01

    Decisions taken by the astronomy and astrophysics survey committee and the interferometry panel which lead to the formation of the Space Interferometry Science Working Group (SISWG) are outlined. The SISWG was formed by the NASA astrophysics division to provide scientific and technical input from the community in planning for space interferometry and in support of an Astrometric Interferometry Mission (AIM). The AIM program hopes to measure the positions of astronomical objects with a precision of a few millionths of an arcsecond. The SISWG science and technical teams are described and the outcomes of its first meeting are given.

  20. 76 FR 72997 - Railroad Safety Advisory Committee (RSAC); Working Group Activity Update

    Science.gov (United States)

    2011-11-28

    ... two additional Task Groups to work in the areas of track worthiness and brakes. The Track worthiness... Group includes experts and key stakeholders such as international operators of high-speed equipment, car... regulatory language to the Passenger Safety Working Group at the September 16, 2010, meeting. More work...

  1. An overview of therapeutic initiatives when working with persons suffering from dementia

    DEFF Research Database (Denmark)

    Ridder, Hanne Mette Ochsner

    2005-01-01

    In this chapter I will describe how music is used in a wide range of initiatives with persons suffering from dementia. There are various ways of implementing music: in groups or individually, by singing songs, listening to music, dancing, or improvising on instruments. I hope to give an introduct......In this chapter I will describe how music is used in a wide range of initiatives with persons suffering from dementia. There are various ways of implementing music: in groups or individually, by singing songs, listening to music, dancing, or improvising on instruments. I hope to give...

  2. Managing a work-life balance: the experiences of midwives working in a group practice setting.

    Science.gov (United States)

    Fereday, Jennifer; Oster, Candice

    2010-06-01

    To explore how a group of midwives achieved a work-life balance working within a caseload model of care with flexible work hours and on-call work. in-depth interviews were conducted and the data were analysed using a data-driven thematic analysis technique. Children, Youth and Women's Health Service (CYWHS) (previously Women's and Children's Hospital), Adelaide, where a midwifery service known as Midwifery Group Practice (MGP) offers a caseload model of care to women within a midwife-managed unit. 17 midwives who were currently working, or had previously worked, in MGP. analysis of the midwives' individual experiences provided insight into how midwives managed the flexible hours and on-call work to achieve a sustainable work-life balance within a caseload model of care. it is important for midwives working in MGP to actively manage the flexibility of their role with time on call. Organisational, team and individual structure influenced how flexibility of hours was managed; however, a period of adjustment was required to achieve this balance. the study findings offer a description of effective, sustainable strategies to manage flexible hours and on-call work that may assist other midwives working in a similar role or considering this type of work setting. Copyright 2008 Elsevier Ltd. All rights reserved.

  3. Group Work with Adolescents: Principles and Practice. Second Edition. Social Work Practice with Children and Families

    Science.gov (United States)

    Malekoff, Andrew

    2006-01-01

    This popular text provides essential knowledge and skills for conducting creative, strengths-based group work with adolescents. A rich introduction to the field, enlivened by numerous illustrations from actual sessions, the book provides principles and guidelines for practice in a wide range of settings. The book covers all phases of group work,…

  4. FAVL work group: report and recommendations

    International Nuclear Information System (INIS)

    2011-01-01

    This document reports the works of a work group dedicated to the process of search for storage site for low activity and long life radioactive wastes. The authors recall the history of this process which started in the early 1990's, and resulted in the selection of two sites, in Auxon and in Pars-les-Chavanges, and finally in the withdrawal of both towns. Then, the authors analyse the whole process in terms of intervention or participation of local authorities, of information and participation of waste producers. They also discuss the roles of the ASN, IRSN, DGEC, ANDRA and ANDRA's Coesdic. They make recommendations regarding site selection, agenda, responsibilities, preferential representative at the local level, public information, consultation, and project support

  5. Rethinking Engineering by Working Interdisciplinary in Groups

    NARCIS (Netherlands)

    Dr. J.B.F. van Zonneveld; Dr.Ir. Hay Geraedts

    1997-01-01

    In this paper we will describe and present the results of an experiment at the Fontys University of Professional Education in which engineering students work together with students from other disciplines in a multidisciplinary group at the end of their study on a real-life environmental problem

  6. Scattering kernels and cross sections working group

    International Nuclear Information System (INIS)

    Russell, G.; MacFarlane, B.; Brun, T.

    1998-01-01

    Topics addressed by this working group are: (1) immediate needs of the cold-moderator community and how to fill them; (2) synthetic scattering kernels; (3) very simple synthetic scattering functions; (4) measurements of interest; and (5) general issues. Brief summaries are given for each of these topics

  7. Report of the working group on single-particle nonlinear dynamics

    International Nuclear Information System (INIS)

    Bazzani, A.; Bongini, L.; Corbett, J.; Dome, G.; Fedorova, A.; Freguglia, P.; Ng, K.; Ohmi, K.; Owen, H.; Papaphilippou, Y.; Robin, D.; Safranek, J.; Scandale, W.; Terebilo, A.; Turchetti, G.; Todesco, E.; Warnock, R.; Zeitlin, M.

    1999-01-01

    The Working Group on single-particle nonlinear dynamics has developed a set of tools to study nonlinear dynamics in a particle accelerator. The design of rings with large dynamic apertures is still far from automatic. The Working Group has concluded that nonlinear single-particle dynamics limits the performance of accelerators. (AIP) copyright 1999 American Institute of Physics

  8. 75 FR 4904 - Railroad Safety Advisory Committee (RSAC); Working Group Activity Update

    Science.gov (United States)

    2010-01-29

    ... amend regulations protecting persons who work on, under, or between rolling equipment; and persons...-7257] Railroad Safety Advisory Committee (RSAC); Working Group Activity Update AGENCY: Federal Railroad... Committee (RSAC) Working Group Activities. SUMMARY: The FRA is updating its announcement of RSAC's Working...

  9. WWW-based environments for collaborative group work

    NARCIS (Netherlands)

    Collis, Betty

    1998-01-01

    Since 1994, we have been involved in the design and use of a series of WWW-based environments to support collaborative group work for students in a technical university in The Netherlands. These environments, and the course re-design that accompanies each new environment, began in April 1994 and

  10. 75 FR 76070 - Railroad Safety Advisory Committee (RSAC); Working Group Activity Update

    Science.gov (United States)

    2010-12-07

    ... the Passenger Equipment Safety Standards. The Working Group met on September 16, 2010; currently there... ``after arrival mandatory directives,'' among other issues. The Working Group continues to work on after... protecting persons who work on, under, or between rolling equipment and persons applying, removing, or...

  11. Linear Collider Working Group reports from Snowmass '88

    International Nuclear Information System (INIS)

    Ruth, R.D.

    1989-03-01

    This report contains a summary of the Linear Collider Working Group. Papers on the following topics are discussed: parameters; damping ring; bunch compressor; linac; final focus; and multibunch effects

  12. Cultural diversity and work-group performance : Detecting the rules

    NARCIS (Netherlands)

    Girndt, T.

    2000-01-01

    With greater levels of international cooperation, work-groups are increasingly composed of members from different cultures. These groups often suffer from communication problems; however, research suggests that they also benefit from their members cultural diversity and generate higher ranges of

  13. Working group report: methane emissions from biomass burning

    International Nuclear Information System (INIS)

    Delmas, R.A.; Ahuja, D.

    1993-01-01

    Biomass burning is a significant source of atmospheric methane. Like most other sources of methane, it has both natural and anthropogenic causes, although anthropogenic causes now predominate. Most of the estimates of methane emissions from biomass burning in the past have relied on a uniform emission factor for all types of burning. This results in the share of trace gas emissions for different types of burning being the same as the amounts of biomass burned in those types. The Working Group endorsed the extension of an approach followed for Africa by Delmas et al. (1991) to use different emission factors for different types of biomass burning to estimate national emissions of methane. This is really critical as emission factors present important variations. While the focus of discussions of the Working Group was on methane emissions from biomass burning, the Group endorsed the IPCC-OECD methodology of estimating all greenhouse related trace gases from biomass burning. Neither the IPCC-OECD nor the methodology suggested here applies to estimation of trace gas emissions from the processing of biomass to upgraded fuels. They must be estimated separately. The Group also discussed technical options for controlling methane emissions from biomass. 12 refs

  14. Working group report on agriculture

    International Nuclear Information System (INIS)

    Stewart, B.

    1991-01-01

    A summary is provided of the results from a working group investigating the implications of climatic change on agriculture in the Great Plains. The group investigated the current state of knowledge concerning basic understanding of climatic impacts, scales of analysis, impact model validation, lack of integrated modelling, and incomplete and incompatible data sets. Basic understanding of current spatial and temporal climatic variability and its impacts and implications for agricultural production, land resource sustainability, and farm management decisions is imprecise. There is little understanding of the magnitude of potential longer-term changes, timing, likely regional changes, or probability of change. Most models are unvalidated, and knowledge of potential carbon dioxide enrichment effects on crops is very uncertain and the effects are poorly understood. Research should be expanded to develop a better understanding of the critical thresholds and sensitivity of Great Plains agricultural production and economic systems. Holistic methodology should be implemented to integrate weather and climatic information with crop and environmental processes, farm level decision making, and local and regional economic conditions

  15. Working Group 2 summary: Space charge effects in bending systems

    International Nuclear Information System (INIS)

    Bohn, C.L.; Emma, P.J.

    2000-01-01

    At the start of the Workshop, the authors asked the Working Group 2 participants to concentrate on three basic goals: (1) survey the status of how comprehensively the physics concerning space-charge effects in bends is understood and how complete is the available ensemble of analytic and computational tools; (2) guided by data from experiments and operational experience, identify sources of, and cures for, beam degradation; and (3) review space-charge physics in rings and the limitations it introduces. As the Workshop unfolded, the third goal naturally folded into the other two goals, and these goals, they believe, were fulfilled in that the Working Group was able to compile an end product consisting of a set of recommendations for potentially fruitful future work. This summary constitutes an overview of the deliberations of the Working Group, and it is their hope that the summary clarifies the motivation for the recommended work listed at the end. The summary is organized according to the two aforementioned goals, and the prime topics of discussion appear as subsections under these goals

  16. 75 FR 51525 - Railroad Safety Advisory Committee (RSAC); Working Group Activity Update

    Science.gov (United States)

    2010-08-20

    .... The Working Group continues to work on after arrival orders, and at the September 25-26, 2008, meeting... protecting persons who work on, under, or between rolling equipment and persons applying, removing or.... 63] Railroad Safety Advisory Committee (RSAC); Working Group Activity Update AGENCY: Federal Railroad...

  17. Hawaii Clean Energy Initiative (HCEI) Scenario Analysis: Quantitative Estimates Used to Facilitate Working Group Discussions (2008-2010)

    Energy Technology Data Exchange (ETDEWEB)

    Braccio, R.; Finch, P.; Frazier, R.

    2012-03-01

    This report provides details on the Hawaii Clean Energy Initiative (HCEI) Scenario Analysis to identify potential policy options and evaluate their impact on reaching the 70% HECI goal, present possible pathways to attain the goal based on currently available technology, with an eye to initiatives under way in Hawaii, and provide an 'order-of-magnitude' cost estimate and a jump-start to action that would be adjusted with a better understanding of the technologies and market.

  18. The Fisheries and Marine Renewable Energy Working Group: creating an agenda for improved co-existence.

    Science.gov (United States)

    Campbell, M. S.; De Groot, J.; Ashley, M.; Rodwell, L.

    2014-12-01

    As an emerging industry, Marine Renewable Energy (MRE) is expected to play a major contributory role if the UK is to successfully reach its desired target of renewable energy production by 2020. However, due to the competing objectives and priorities of MRE and other industries, for example fisheries, and in the delivering of conservation measures, the demand for space within our marine landscape is increasing, and interactions are inevitable. In order to promote better understanding of the challenges in resolving interactions between these industries, a Fisheries and Marine Renewable Energy Working Group was set up under the Natural Environment Research Council Marine Renewable Energy Knowledge Exchange Programme (NERC MREKEP). The Working Group carried out an initial scoping survey in order to summarise recent and current research activities and identify key issues and topics in the fields of fisheries and MRE interactions. Mixed stakeholder groups discussed four primary topics: priority issues; barriers to progress; problem mitigation; and thoughts on the consultation process. Points of discussion were categorized into themes to aid analysis and protocol development. These themes were: culture, community and economy; legislation and rights; data and information; and collaboration and communication. Subsequent invited stakeholder and expert panel workshops were held to facilitate knowledge exchange between fisheries and development of MRE in order to identify priority research issues, knowledge gaps and collaboration needs. Four group sessions identified: practical steps to aid interaction between industries; barriers, opportunities and solutions; an agenda for action, timescales and partners; and action points carried forward by each stakeholder group. This Working Group, guided under the MREKEP banner, is the first of its kind in the UK, bringing together individuals from a nationally diverse group of academics, regulators, policy makers and representatives

  19. An empirical study of work and family life spheres and emergence of work-life balance initiatives under uncertain economic scenario.

    OpenAIRE

    Naithani, Pranav

    2009-01-01

    In the last six decades, work life and family life spheres of employees have undergone various changes. This paper presents an empirical study of major factors which have influenced employee work-life balance and popular work-life balance tools initiated at organisational level to help an employee balance different life segments such as work, family, personal finances, career and health. Current work-life balance approach, tools and programmes at organisational level primarily address those i...

  20. An empirical study of work and family life spheres and emergence of work-life balance initiatives under uncertain economic scenario

    OpenAIRE

    Naithani, Pranav; Jha, A.N.

    2009-01-01

    In the last six decades, work life and family life spheres of employees have undergone various changes. This paper presents an empirical study of major factors which have influenced employee work-life balance and popular work-life balance tools initiated at organisational level to help an employee balance different life segments such as work, family, personal finances, career and health. Current work-life balance approach, tools and programmes at organisational level primarily address those i...

  1. Comparison Between Individually and Group-Based Insulin Pump Initiation by Time-Driven Activity-Based Costing.

    Science.gov (United States)

    Ridderstråle, Martin

    2017-07-01

    Depending on available resources, competencies, and pedagogic preference, initiation of insulin pump therapy can be performed on either an individual or a group basis. Here we compared the two models with respect to resources used. Time-driven activity-based costing (TDABC) was used to compare initiating insulin pump treatment in groups (GT) to individual treatment (IT). Activities and cost drivers were identified, timed, or estimated at location. Medical quality and patient satisfaction were assumed to be noninferior and were not measured. GT was about 30% less time-consuming and 17% less cost driving per patient and activity compared to IT. As a batch driver (16 patients in one group) GT produced an upward jigsaw-shaped accumulative cost curve compared to the incremental increase incurred by IT. Taking the alternate cost for those not attending into account, and realizing the cost of opportunity gained, suggested that GT was cost neutral already when 5 of 16 patients attended, and that a second group could be initiated at no additional cost as the attendance rate reached 15:1. We found TDABC to be effective in comparing treatment alternatives, improving cost control and decision making. Everything else being equal, if the setup is available, our data suggest that initiating insulin pump treatment in groups is far more cost effective than on an individual basis and that TDABC may be used to find the balance point.

  2. WHO Working Group on Technical Specifications for Manufacture and Evaluation of Yellow Fever Vaccines, Geneva, Switzerland, 13-14 May 2009.

    Science.gov (United States)

    Ferguson, Morag; Shin, Jinho; Knezevic, Ivana; Minor, Philip; Barrett, Alan

    2010-12-06

    In May 2009, WHO convened a meeting of Working Group on Technical Specifications for Manufacturing and Evaluating Yellow Fever (YF) Vaccines, Geneva, Switzerland to initiate revision of the WHO Recommendations (formerly, Requirements) for YF vaccine published in WHO Technical Report Series number 872 (1998). The Working Group, consisting of experts from academia, industry, national regulatory authorities and national control laboratories, reviewed the latest issues of safety, efficacy and quality of YF vaccines and agreed that (i) the revision should focus on live attenuated YF vaccine virus 17D lineage; and that (ii) nonclinical and clinical guidelines for new vaccines prepared from 17D lineage be developed. Copyright © 2010. Published by Elsevier Ltd.. All rights reserved.

  3. Environmental Working Group Arctic Meteorology and Climate Atlas

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Environmental Working Group (EWG) was established in June 1995 under the framework of the U.S.-Russian Joint Commission on Economic and Technological...

  4. Working Group Report: Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Artuso, M.; et al.,

    2013-10-18

    Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

  5. 77 FR 23668 - GPS Satellite Simulator Working Group Notice of Meeting

    Science.gov (United States)

    2012-04-20

    ... DEPARTMENT OF DEFENSE Department of the Air Force GPS Satellite Simulator Working Group Notice of... inform the public that the Global Positioning Systems (GPS) Directorate will be hosting an open GPS Satellite Simulator Working Group (SSWG) meeting for manufacturers of GPS constellation simulators utilized...

  6. Report of the CP-violation working group

    International Nuclear Information System (INIS)

    Hoffman, C.M.

    1982-01-01

    The CP-Violation Working Group met twice during the workshop. A nice summary of our present knowledge of CP-violation was presented in the talk by Prof. James W. Cronin. In the final paragraph of his talk, Prof. Cronin argues that higher precision experiments studying CP-violation at LAMPF II will be extremely important no matter what additional knowledge we acquire in the time before LAMPF II is constructed. The crucial issue at present is to uncover the underlying mechanism responsible for CP-violation. The Working Group heard several talks aimed at reviewing the theoretical status of CP-violation and the directions that future experimental efforts might take. These talks included: Kaon Experiments at KEK, T. Yamazaki, University of Tokyo; Mechanisms for CP Violation, P. Herczeg, Los Alamos; and The Experimental Status of eta 00 Experiments, J.W. Cronin, Univ. of Chicago. There were also extended discussions on which experiments appear to be the most important and how to best perform these measurements. A summary of these discussions is given

  7. The recommendations of the noise working group

    International Nuclear Information System (INIS)

    Legerton, M.L.

    1997-01-01

    In 1993 the DTI set up a Working Group to define a framework which can be used to measure and rate the noise from wind turbines. The final report of the Noise Working Group is now available for publication. The advice on the setting of noise limits for wind farms is largely unaltered from the preliminary recommendations presented at the 17th BWEA Annual Conference [1]. This paper recaps on those recommendations and provides additional information on the measurement procedures to be used with the recommendations on noise limits. The paper describes the measurement of the existing background noise climate on which the limits are based and the procedure to be used for the measurement of turbine noise levels in the investigation of complaints. The noise limits are rated noise levels in that they can include a penalty for tones present in the noise. The level of penalty depends upon the audibility of the tone and measurement procedure for determining audibility and the associated penalty system are also described. (author)

  8. Working Group on Ionising Radiations. Report 1987-88

    International Nuclear Information System (INIS)

    1989-01-01

    The programme of work for 1987/88 by the Working Group on Ionising Radiation, Health and Safety Commision in February 1988, included the main topics of continuing interest and concern in relation to ionising radiations in general and the Ionising Radiations Regulations 1985 (IRR 85) (Ref 1) in particular. These were: emergency dose limitation, occupational dose limitation, practical experience of the principle of keeping doses as low as reasonably practicable, experience of the regulatory requirements in respect of internal dosimetry and the need for a standing advisory committee on ionising radiations. Calibration of radiotherapy equipment was also considered as a matter of principle following a specific incident involving cancer patients. This report of progress during the first year summarises the Group's opinions on each topic and gives recommendations. (author)

  9. Reports from the Combined Performance Working Groups

    CERN Multimedia

    S. Haywood

    The main goal of the Combined Performance Groups is to study the detector performance for physics, as well as to monitor the effect of changes to the detector layout and the evolution of the software. The groups combine the expertise available in several different subdetectors. In addition, they are responsible for developing combined reconstruction algorithms and are involved in the calibration of energy scales and optimising resolutions. For the Workshop, the four groups made a real effort to compare the reconstruction in Athena (the "New" C++ software framework) and Atrecon (the "Old" software used for the TDR studies). b-tagging Working Group: Over the last few months, the description of the Inner Detector in the simulation has become more realistic, following the evolution of the detector design. This has caused the amount of material in the simulation to increase and the Pixel B-layer has been moved to a larger radius to allow for a wider beam-pipe. Nevertheless, the good performance of the b-tagging (...

  10. Neural activity reveals perceptual grouping in working memory.

    Science.gov (United States)

    Rabbitt, Laura R; Roberts, Daniel M; McDonald, Craig G; Peterson, Matthew S

    2017-03-01

    There is extensive evidence that the contralateral delay activity (CDA), a scalp recorded event-related brain potential, provides a reliable index of the number of objects held in visual working memory. Here we present evidence that the CDA not only indexes visual object working memory, but also the number of locations held in spatial working memory. In addition, we demonstrate that the CDA can be predictably modulated by the type of encoding strategy employed. When individual locations were held in working memory, the pattern of CDA modulation mimicked previous findings for visual object working memory. Specifically, CDA amplitude increased monotonically until working memory capacity was reached. However, when participants were instructed to group individual locations to form a constellation, the CDA was prolonged and reached an asymptote at two locations. This result provides neural evidence for the formation of a unitary representation of multiple spatial locations. Published by Elsevier B.V.

  11. Initial evaluation of psychometric properties of a structured work task application for the Assessment of Work Performance in a constructed environment.

    Science.gov (United States)

    Karlsson, Elin A; Liedberg, Gunilla M; Sandqvist, Jan L

    2017-06-22

    The Swedish Social Insurance Administration has developed a new assessment tool for sickness insurance. This study is a part of the initial evaluation of the application, called the Assessment of Work Performance, Structured Activities, and focuses on evaluation of the psychometric properties of social validity, content validity, and utility. This was a qualitative study using semi-structured telephone interviews with occupational therapists. A convenience sample was used and participants who fulfilled inclusion criteria (n = 15) were interviewed. Data were analyzed using content analysis with a directed approach. The results indicate that the application provides valuable information and that it is socially valid. Assessors found work tasks suitable for a diverse group of clients and reported that clients accepted the assessments. Improvements were suggested, for example, expanding the application with more work tasks. The instrument has benefits; however, further development is desired. The use of a constructed environment in assessments may be a necessary option to supplement a real environment. But depending on organizational factors such as time and other resources, the participants had different opportunities to do so. Further evaluations regarding ecological validity are essential to ensure that assessments are fair and realistic when using constructed environments. Implications for rehabilitation This study indicates that assessment in a constructed environment can provide a secure and protected context for clients being assessed. Psychometric evaluations are a never-ending process and this assessment instrument needs further development. However, this initial evaluation provides guidance in development of the instrument but also what studies to give priority to. It is important to evaluate social validity in order to ensure that clients and assessors perceive assessment methods fair and meaningful. In this study, participants found the work tasks

  12. Becoming the denigrated other: Group relations perspectives on initial reactions to a bipolar disorder diagnosis

    Directory of Open Access Journals (Sweden)

    Susan G. Goldberg

    2012-09-01

    Full Text Available The initial reactions to a bipolar disorder diagnosis of research participants in a small, qualitative study consisted of astonishment, dread of being mad, and extremely negative associations. All had prior mental health diagnoses, including episodes of severe depression (all but one and alcoholism (one. All participants reported mental health histories prediagnosis and most had spent years contending with mental health labels, medications, symptoms, and hospitalizations. In addition, most participants were highly educated health professionals, quite familiar with the behaviors that the medical system considered to comprise bipolar disorder. Their negative associations to the initial bipolar disorder diagnosis, therefore, appeared inconsistent with their mental health histories and professional knowledge. This article contextualizes these initial reactions of shock and distress and proposes interpretations of these findings from societal and psychodynamic group relations perspectives. The participants’ initial negative reactions are conceptualized as involving the terror of being transported from the group of normal people into the group of mad or crazy people, i.e., people with mental illnesses, who may constitute a societal denigrated other.

  13. ACPSEM brachytherapy working group recommendations for quality assurance in brachytherapy

    International Nuclear Information System (INIS)

    Dempsey, Claire; Smith, Ryan; Nyathi, Thulani; Ceylan, Abdurrahman; Howard, Lisa; Patel, Virendra; Dam, Ras; Haworth, Annette

    2013-01-01

    The Australasian College of Physical Scientists and Engineers in Medicine (ACPSEM) Radiation Oncology Specialty Group (ROSG) formed a series of working groups in 2011 to develop recommendation papers for guidance of radiation oncology medical physics practice within the Australasian setting. These recommendations are intended to provide guidance for safe work practices and a suitable level of quality control without detailed work instructions. It is the responsibility of the medical physicist to ensure that locally available equipment and procedures are sufficiently sensitive to establish compliance to these recommendations. The recommendations are endorsed by the ROSG, have been subject to independent expert reviews and have also been approved by the ACPSEM Council. For the Australian audience, these recommendations should be read in conjunction with the Tripartite Radiation Oncology Practice Standards. This publication presents the recommendations of the ACPSEM Brachytherapy Working Group (BTWG) and has been developed in alignment with other international associations. However, these recommendations should be read in conjunction with relevant national, state or territory legislation and local requirements, which take precedence over the ACPSEM recommendation papers. It is hoped that the users of this and other ACPSEM recommendation papers will contribute to the development of future versions through the Radiation Oncology Specialty Group of the ACPSEM.

  14. Improving Group Work Practices in Teaching Life Sciences: Trialogical Learning

    Science.gov (United States)

    Tammeorg, Priit; Mykkänen, Anna; Rantamäki, Tomi; Lakkala, Minna; Muukkonen, Hanni

    2017-08-01

    Trialogical learning, a collaborative and iterative knowledge creation process using real-life artefacts or problems, familiarizes students with working life environments and aims to teach skills required in the professional world. We target one of the major limitation factors for optimal trialogical learning in university settings, inefficient group work. We propose a course design combining effective group working practices with trialogical learning principles in life sciences. We assess the usability of our design in (a) a case study on crop science education and (b) a questionnaire for university teachers in life science fields. Our approach was considered useful and supportive of the learning process by all the participants in the case study: the students, the stakeholders and the facilitator. Correspondingly, a group of university teachers expressed that the trialogical approach and the involvement of stakeholders could promote efficient learning. In our case in life sciences, we identified the key issues in facilitating effective group work to be the design of meaningful tasks and the allowance of sufficient time to take action based on formative feedback. Even though trialogical courses can be time consuming, the experience of applying knowledge in real-life cases justifies using the approach, particularly for students just about to enter their professional careers.

  15. Gynecologic Oncology Group quality assurance audits: analysis and initiatives for improvement.

    Science.gov (United States)

    Blessing, John A; Bialy, Sally A; Whitney, Charles W; Stonebraker, Bette L; Stehman, Frederick B

    2010-08-01

    The Gynecologic Oncology Group (GOG) is a multi-institution, multi-discipline Cooperative Group funded by the National Cancer Institute (NCI) to conduct clinical trials which investigate the treatment, prevention, control, quality of survivorship, and translational science of gynecologic malignancies. In 1982, the NCI initiated a program of on-site quality assurance audits of participating institutions. Each is required to be audited at least once every 3 years. In GOG, the audit mandate is the responsibility of the GOG Quality Assurance Audit Committee and it is centralized in the Statistical and Data Center (SDC). Each component (Regulatory, Investigational Drug Pharmacy, Patient Case Review) is classified as Acceptable, Acceptable, follow-up required, or Unacceptable. To determine frequently occurring deviations and develop focused innovative solutions to address them. A database was created to examine the deviations noted at the most recent audit conducted at 57 GOG parent institutions during 2004-2007. Cumulatively, this involved 687 patients and 306 protocols. The results documented commendable performance: Regulatory (39 Acceptable, 17 Acceptable, follow-up, 1 Unacceptable); Pharmacy (41 Acceptable, 3 Acceptable, follow-up, 1 Unacceptable, 12 N/A): Patient Case Review (31 Acceptable, 22 Acceptable, follow-up, 4 Unacceptable). The nature of major and lesser deviations was analyzed to create and enhance initiatives for improvement of the quality of clinical research. As a result, Group-wide proactive initiatives were undertaken, audit training sessions have emphasized recurring issues, and GOG Data Management Subcommittee agendas have provided targeted instruction and training. The analysis was based upon parent institutions only; affiliate institutions and Community Clinical Oncology Program participants were not included, although it is assumed their areas of difficulty are similar. The coordination of the GOG Quality Assurance Audit program in the SDC has

  16. Group Organized Project Work in Distance Education

    DEFF Research Database (Denmark)

    Helbo, Jan; Knudsen, Morten; Jensen, Lars Peter

    2001-01-01

    Project organized problem based learning is a successful concept for on-campus education at Aalborg University. Recently this "Aalborg concept" has been used in networked distance education as well. This paper describes the experiences from two years of Internet-mediated project work in a new...... Master of Information Technology education. The main conclusions are, that the project work is a strong learning motivator, enhancing peer collaboration, for off-campus students as well. However, the concept cannot be directly transferred to off-campus learning. The main reasons are that the students...... must communicate electronically, and that they are under a fierce time strain, studying part time and typically with a full time job and a family. In this paper, the main problems experienced with group organized project work in distance education are described, and some possible solutions are listed...

  17. Interim report of working group of Nuclear Fusion Committee

    International Nuclear Information System (INIS)

    Takuma, Hiroshi

    1986-01-01

    The conclusion of the working group was presented as an interim report to the general meeting of Nuclear Fusion Committee, which became the base for deciding the future plan. The report was the result of the hard work for about a half year by five Committee experts and 23 researchers, and has the rich contents. At present, the supply of petroleum relaxed, and the trend that a large amount of investment for a long period for nuclear fusion research is problematical has become strong. Of course, the importance of the nuclear fusion research never changes. The research projects of Heliotron E, Gekko 12, Gamma 10 and so on have advanced, and the base for synthetically promoting the research has been completed. It is indispensable to decide the most effective plan for the next stage. The working group discussed on the five year plan, especially on the research based on a large project. The policy of the works and problems, the progress of the works of respective subgroups, and the summarization are reported. The researches on nuclear burning simulation, no current plasma using an external conductor system and making an axisymmetrical high-beta torus steady were proposed. (Kako, I.)

  18. Progress report on the work of sub-group B

    International Nuclear Information System (INIS)

    Buck, C.; Tamiya, S.

    1979-01-01

    This paper reviews sub group B's 11 tasks, commenting upon each and noting what work remains to be done and the procedure adopted for completing it. The majority of the tasks have been completed and it was decided that further consideration of their assessment of proliferation resistance, institutional and safeguards questions and the economic assessment of reprocessing be carried out jointly with sub group A. It was also agreed that all further meetings of sub group B should take place jointly with sub group A

  19. Activities of covariance utilization working group

    International Nuclear Information System (INIS)

    Tsujimoto, Kazufumi

    2013-01-01

    During the past decade, there has been a interest in the calculational uncertainties induced by nuclear data uncertainties in the neutronics design of advanced nuclear system. The covariance nuclear data is absolutely essential for the uncertainty analysis. In the latest version of JENDL, JENDL-4.0, the covariance data for many nuclides, especially actinide nuclides, was substantialy enhanced. The growing interest in the uncertainty analysis and the covariance data has led to the organisation of the working group for covariance utilization under the JENDL committee. (author)

  20. Working group report: Flavor physics and model building

    Indian Academy of Sciences (India)

    cO Indian Academy of Sciences. Vol. ... This is the report of flavor physics and model building working group at ... those in model building have been primarily devoted to neutrino physics. ..... [12] Andrei Gritsan, ICHEP 2004, Beijing, China.

  1. Report from the Panama Canal Stakeholder Working Group.

    Science.gov (United States)

    2013-03-01

    This project assists the Texas Department of Transportation (TxDOT) in assessing the potential impacts of the Panama Canal expansion on Texas ports and the landside transportation system. TxDOT formed a Panama Canal Stakeholder Working Group (PCSWG) ...

  2. Summary from working group on noninterceptive diagnostics

    International Nuclear Information System (INIS)

    Chamberlin, D.D.

    1985-01-01

    The working group for noninterceptive diagnostics spent much of its time comparing diagnostic techniques from different fields and their possible application to high-power injectors. The group included backgrounds from electron beam diagnostics, fusion power diagnostics, cw ion source and transport design, and ion beam of diagnostics. The probability of success for adapting techniques from these different areas is quite difficult to judge, short of a detailed examination of each application. Unexpected flaws or unforeseen noise sources can eliminate an idea that would otherwise appear promising. The report presents several ideas that were discussed, with an indication of those ideas most likely to succeed if implemented

  3. Individual and group-level job resources and their relationships with individual work engagement.

    Science.gov (United States)

    Füllemann, Désirée; Brauchli, Rebecca; Jenny, Gregor J; Bauer, Georg F

    2016-06-16

    This study adds a multilevel perspective to the well-researched individual-level relationship between job resources and work engagement. In addition, we explored whether individual job resources cluster within work groups because of a shared psychosocial environment and investigated whether a resource-rich psychosocial work group environment is beneficial for employee engagement over and above the beneficial effect of individual job resources and independent of their variability within groups. Data of 1,219 employees nested in 103 work groups were obtained from a baseline employee survey of a large stress management intervention project implemented in six medium and large-sized organizations in diverse sectors. A variety of important job resources were assessed and grouped to an overall job resource factor with three subfactors (manager behavior, peer behavior, and task-related resources). Data were analyzed using multilevel random coefficient modeling. The results indicated that job resources cluster within work groups and can be aggregated to a group-level job resources construct. However, a resource-rich environment, indicated by high group-level job resources, did not additionally benefit employee work engagement but on the contrary, was negatively related to it. On the basis of this unexpected result, replication studies are encouraged and suggestions for future studies on possible underlying within-group processes are discussed. The study supports the presumed value of integrating work group as a relevant psychosocial environment into the motivational process and indicates a need to further investigate emergent processes involved in aggregation procedures across levels.

  4. Executive committee report: geotechnical instrumentation working group meeting

    International Nuclear Information System (INIS)

    Wilder, D.G.; Rogue, F.; Beloff, W.R.; Binnall, E.; Gregory, E.C.

    1982-01-01

    Responding to the widespread need for the geotechnical community to discuss instrumentation for nuclear waste repositories, a meeting was held December 2 and 3, 1981, in Denver, Colorado. This report gives the group's consensus recommendations to aid in making decisions for development of instrumentation for future repository work. The main conclusions of the working group meeting were as follows: (1) monitoring of geotechnical parameters in nuclear waste repositories will be necessary to meet licensing requirements; (2) currently available instruments are underdeveloped for this monitoring; (3) research and development to provide adequate instrumentation will need to be performed under federal sponsorship by national laboratories, universities, contractors, and consultants; and (4) a NASA-type reliability program is needed to meet the quality assurance, durability, calibration, and time schedule demands of geotechnical instrumentation development. This will require significant financial commitments from the federal sector

  5. Self-Efficacy in Social Work: Development and Initial Validation of the Self-Efficacy Scale for Social Workers

    Directory of Open Access Journals (Sweden)

    Monica Pedrazza

    2013-09-01

    Full Text Available Self-efficacy beliefs do not reflect a generic sense of competence, but are instead context-specific. Therefore, self-efficacy should be assessed by using an ad hoc scale measuring individual behaviors that allows social workers to exercise influence over events that affect their work life. The present study describes the development and initial validation of the self-efficacy scale for social workers (SESSW. Items were generated through the Critical Incident Technique. Sixteen social workers with at least 10 years of service participated in two focus groups; they were asked to recall critical incidents in their work and to indicate the most effective behaviors to manage the incidents. Content analysis of the focus group transcripts provided 13 key self-efficacy beliefs. The 13-item scale was validated with a sample of 805 social workers. Data were analyzed using a split-sample technique. Exploratory factor analysis on the first split sample (n = 402 revealed three dimensions of self-efficacy, corresponding to emotion regulation, support request, and procedural self-efficacy. The three-factor structure of the scale was further confirmed with confirmatory factor analysis on the second split sample (n = 403. Our results show that SESSW is an adequate instrument for assessment of self-efficacy beliefs in social work.

  6. Division X Working Group on Historic Radio Astronomy

    NARCIS (Netherlands)

    Orchiston, Wayne; Kellermann, Kenneth I.; Davies, Rodney D.; Débarbat, Suzanne V.; Morimoto, Masaki; Slysh, Slava; Swarup, Govind; van Woerden, Hugo; Wall, Jasper V.; Wielebinski, Richard

    During the Rio General Assembly we held the following meetings of the Working Group: a Business Meeting, a Science Meeting on “The Development of Aperture Synthesis Imaging in Radio Astronomy”, and a Science Meeting on “Recent Research”.

  7. Working group report: Low energy and flavour physics

    Indian Academy of Sciences (India)

    This is a report of the low energy and flavour physics working group at ... that calculates the non-leptonic decay amplitudes including the long-distance con- tributions. There were three lectures that lasted for over seven hours, and were.

  8. Chernobyl Studies Project: Working group 7.0, Environmental transport and health effects. Progress report, March--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anspaugh, L.R.; Hendrickson, S.M. [eds.

    1994-12-01

    In April 1988, the US and the former-USSR signed a Memorandum of Cooperation (MOC) for Civilian Nuclear Reactor Safety; this MOC was a direct result of the accident at the Chernobyl Nuclear Power Plant Unit 4 and the following efforts by the two countries to implement a joint program to improve the safety of nuclear power plants and to understand the implications of environmental releases. A Joint Coordinating Committee for Civilian Nuclear Reactor Safety (JCCCNRS) was formed to implement the MOC. The JCCCNRS established many working groups; most of these were the responsibility of the Nuclear Regulatory Commission, as far as the US participation was concerned. The lone exception was Working Group 7 on Environmental Transport and Health Effects, for which the US participation was the responsibility of the US Department of Energy (DOE). The purpose of Working Group 7 was succintly stated to be, ``To develop jointly methods to project rapidly the health effects of any future nuclear reactor accident.`` To implement the work DOE then formed two subworking groups: 7.1 to address Environmental Transport and 7.2 to address Health Effects. Thus, the DOE-funded Chernobyl Studies Project began. The majority of the initial tasks for this project are completed or near completion. The focus is now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are currently working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.

  9. Synthesis, characterization and use of ATRP bifunctional initiator with trichloromethyl end-groups

    Czech Academy of Sciences Publication Activity Database

    Toman, Luděk; Janata, Miroslav; Spěváček, Jiří; Masař, Bohumil; Vlček, Petr; Látalová, Petra

    2002-01-01

    Roč. 43, č. 2 (2002), s. 18-19 ISSN 0032-3934 R&D Projects: GA ČR GA203/01/0513 Institutional research plan: CEZ:AV0Z4050913 Keywords : bifunctional initiator * ATRP polymerization * trichloromethyl end-groups Subject RIV: CD - Macromolecular Chemistry

  10. Changing Work and Work-Family Conflict: Evidence from the Work, Family, and Health Network*

    OpenAIRE

    Kelly, Erin L.; Moen, Phyllis; Oakes, J. Michael; Fan, Wen; Okechukwu, Cassandra; Davis, Kelly D.; Hammer, Leslie; Kossek, Ellen; King, Rosalind Berkowitz; Hanson, Ginger; Mierzwa, Frank; Casper, Lynne

    2014-01-01

    Schedule control and supervisor support for family and personal life are work resources that may help employees manage the work-family interface. However, existing data and designs have made it difficult to conclusively identify the effects of these work resources. This analysis utilizes a group-randomized trial in which some units in an information technology workplace were randomly assigned to participate in an initiative, called STAR, that targeted work practices, interactions, and expecta...

  11. 77 FR 75425 - Interagency Working Group on Plant Genomics (IWGPG): The National Plant Genome Initiative-What's...

    Science.gov (United States)

    2012-12-20

    ... Genome Initiative--What's Next? AGENCY: Office of Science, Office of Biological and Environmental... INFORMATION CONTACT: Dr. Catherine Ronning, U.S. Department of Energy, Office of Science, Office of Biological... 20585-1290. Phone 301-903-9549, fax (301) 903-5051, email: [email protected]science.doe.gov ; Dr. Jane...

  12. Cultivating and Benefiting from Member Familiarity in Temporary Work Groups

    DEFF Research Database (Denmark)

    Hessel, Shannon

    In this paper, I investigate an example of short-duration, time-bound project work conducted by high-performing groups in order to surprise our expectations regarding the motivations and potential to cooperate and to cultivate group member familiarity within such temporary organizations. Project...... limited time and a perceived short shadow of the future. Several contributions result: First, I challenge our expectation that a short shadow of the future will decrease the likelihood of cooperation by demonstrating how the clan-like tendency to construct common values and aspirations motivated...... cooperative behavior in these groups. Second, I challenge our expectation that a task-oriented over relationship-oriented approach will inevitably dominate work when projects are time-bound and of short duration by describing moments in which these groups chose relationship-oriented activities despite time...

  13. Report by the Working Group renewing the reasonableness control over the energy market

    International Nuclear Information System (INIS)

    2003-01-01

    The Working Group was to draw up proposals for a reform of the pricing methodology for the network operations of the power and natural gas markets and of their reasonableness control. The objective of the reform is to make them meet the requirements of the EC Directives on the Internal Market in Energy as from 1 July 2004. The Working Group was also to pay attention to the organisation of network control over network operations in other countries, to the structure of distribution tariffs, the position of power users and to initiatives made by trade associations to the Ministry of Trade and Industry on control over network operations. The Working Group proposes a new model for the control of power and natural gas network operations in which the Energy Market Authority would carry out an ex-post evaluation of the profit of all network operators within the framework of a five-year control period. The control period would allow levelling of the annual variations resulting from interest and temperature fluctuations and investments, and at the same time maintaining stable pricing. The pricing methodology to be applied during the control period would be imposed on the network operators by company-specific methodology decisions made by the Energy Market Authority before the control period. A methodology decision would be in force during one control period at a time, and it would be revised as necessary for the next control period. During a control period, a network operator could, during one year, take a profit higher than the profit limit to be deemed reasonable without an immediate intervention of the surveillance authority. After the end of a control period, the Energy Market Authority would state by its decision the profit, based on each company's tariff methodology, accrued during the control period and also confirm the amount of the returns higher or lower than the reasonable profit accrued during the control period. The decision would include an obligation to pay

  14. Report of the first interim meeting of the Seabed Working Group Engineering Studies Task Group

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1982-02-01

    The first interim meeting of the Engineering Studies Task Group (ESTG) was held at the Delft Soil Mechanics Laboratory, Delft, The Netherlands, on 21-24 September 1981. The main business of the meeting was the development of a network analysis for the ESTG. Significant progress was made; however, substantial further development remains to be accomplished. Other items discussed were (1) progress relevant to engineering studies made in the various national programs since the sixth annual meeting of the Seabed Working Group (SWG) held in Paris, February, 1981; (2) the ESTG Boundary Conditions and Scope of Work as previously defined at the Paris meeting; (3) the Draft II SWG Five-Year Plan; (4) the deep ocean drilling proposal made by the Site Selection Task Group at the Paris meeting and expanded upon at their May, 1981, meeting; and (5) a recent compilation of data from the Nares Abyssal Plain arising from the US Program studies. Finally, consideration was given to a plan for continued work by the ESTG. A brief discussion of the principal items is given. The current state of the network analysis is shown

  15. TMAP ad hoc Working Group Fish Progress report 2007

    NARCIS (Netherlands)

    Bolle, L.J.; Damm, U.; Diederichs, B.; Jager, Z.; Overzee, van H.M.J.

    2007-01-01

    Building on previous work done by the TMAP ad hoc Working Group Fish, a meeting and a workshop were held in Hamburg in June and October 2007. The most important aim of both was to come to an agreement on how to proceed with the data preparations and analyses, and to facilitate the exchange of data

  16. Medical Team Training: Using Simulation as a Teaching Strategy for Group Work

    Science.gov (United States)

    Moyer, Michael R.; Brown, Rhonda Douglas

    2011-01-01

    Described is an innovative approach currently being used to inspire group work, specifically a medical team training model, referred to as The Simulation Model, which includes as its major components: (1) Prior Training in Group Work of Medical Team Members; (2) Simulation in Teams or Groups; (3) Multidisciplinary Teamwork; (4) Team Leader…

  17. Interference control in working memory: comparing groups of children with atypical development.

    Science.gov (United States)

    Palladino, Paola; Ferrari, Marcella

    2013-01-01

    The study aimed to test whether working memory deficits in children at risk of Learning Disabilities (LD) and/or attention deficit/hyperactivity disorder (ADHD) can be attributed to deficits in interference control, thereby implicating prefrontal systems. Two groups of children known for showing poor working memory (i.e., children with poor comprehension and children with ADHD) were compared to a group of children with specific reading decoding problems (i.e., having severe problems in phonological rather than working memory) and to a control group. All children were tested with a verbal working memory task. Interference control of irrelevant items was examined by a lexical decision task presented immediately after the final recall in about half the trials, selected at random. The interference control measure was therefore directly related to working memory performance. Results confirmed deficient working memory performance in poor comprehenders and children at risk of ADHD + LD. More interestingly, this working memory deficit was associated with greater activation of irrelevant information than in the control group. Poor decoders showed more efficient interference control, in contrast to poor comprehenders and ADHD + LD children. These results indicated that interfering items were still highly accessible to working memory in children who fail the working memory task. In turn, these findings strengthen and clarify the role of interference control, one of the most critical prefrontal functions, in working memory.

  18. A working plan for working group 2 'enrichment' within the scope of INFCE

    International Nuclear Information System (INIS)

    1977-01-01

    A working plan for INFCE/WG.2 is presented, outlining the major questions which the group needs to answer under the headings: 1. Enrichment needs and supply, 2. Models for cross-investment, 3. Market situation, 4. Technical and economic assessment of the different enrichment technologies, and 5. Safeguards aspects. It is suggested that the group's assessment should include: 1. Future enrichment capacities, 2. Multinational or regional fuel cycle centres, 3. Possible patterns for guarantees of supply, and 4. Special needs of developing countries

  19. The OMERACT Ultrasound Working Group 10 Years On

    DEFF Research Database (Denmark)

    Bruyn, George A; Naredo, Esperanza; Iagnocco, Annamaria

    2015-01-01

    Musculoskeletal ultrasound (US) now thrives as an established imaging modality for the investigation and management of chronic inflammatory arthritis. We summarize here results of the Outcome Measures in Rheumatology (OMERACT) US working group (WG) projects of the last 2 years. These results were...

  20. Initial Report of the Fast Timing Working Group

    CERN Document Server

    CMS Collaboration

    2016-01-01

    A preliminary set of results highlighting the unique capabilities of fast-timing for resolving information from individual collisions at the High-Luminosity LHC (HL- LHC) is presented. These results explore the possibilities made available by using fast timing to enhance the reconstruction and physics capabilities of the CMS detector in terms of pileup mitigation and searches for new physics. Fast timing applications in calorimetry, for electromagnetic showers, and for MIPs, to time-tag tracks, are demonstrated as are first examples of what is possible with their combination.

  1. EDF program on SCC initiation of cold-worked stainless steels in primary water

    Energy Technology Data Exchange (ETDEWEB)

    Huguenin, P.; Vaillant, F.; Couvant, T. [Electricite de France (EDF/RD), Site des Renardieres, 77 - Moret sur loing (France); Buisse, L. [EDF UTO, 93 - Noisy-Le-Grand (France); Huguenin, P.; Crepin, J.; Duhamel, C.; Proudhon, H. [MINES ParisTech, Centre des Materiaux, 91 - Evry (France); Ilevbare, G. [EPRI California (United States)

    2009-07-01

    A few cases of Intergranular Stress Corrosion Cracking (IGSCC) on cold-worked austenitic stainless steels in primary water have been detected in French Pressurized Water Reactors (PWRs). A previous program launched in the early 2000's identified the required conditions for SCC of cold-worked stainless steels. It was found that a high strain hardening coupled with cyclic loading favoured SCC, whereas cracking under static conditions appeared to be difficult. A propagation model was also proposed. The first available results of the present study demonstrate the strong influence of a trapezoidal cyclic loading on the creep of 304L austenitic stainless steel. While no creep was detected under a pure static loading, the creep rate was increased by a factor 102 under a trapezoidal cyclic loading. The first results of SCC initiation performed on notched specimens under a trapezoidal cyclic loading at low frequency are presented. The present study aims at developing an engineering model for IGSCC initiation of 304L, 316L and weld 308L stainless steels. The effect of the pre-straining on the SCC mechanisms is more specifically studied. Such a model will be based on (i) SCC initiation tests on notched and smooth specimens under 'trapezoidal' cyclic loading and, (ii) constant strain rate SCC initiation tests. The influence of stress level, cold-work level, strain path, surface roughness and temperature is particularly investigated. (authors)

  2. Studer Group® ' s evidence-based leadership initiatives.

    Science.gov (United States)

    Schuller, Kristin A; Kash, Bita A; Gamm, Larry D

    2015-01-01

    The purpose of this paper is to analyze the implementation of an organizational change initiative--Studer Group®'s Evidence-Based Leadership (EBL)--in two large, US health systems by comparing and contrasting the factors associated with successful implementation and sustainability of the EBL initiative. This comparative case study assesses the responses to two pairs of open-ended questions during in-depth qualitative interviews of leaders and managers at both health systems. Qualitative content analysis was employed to identify major themes. Three themes associated with success and sustainability of EBL emerged at both health systems: leadership; culture; and organizational processes. The theme most frequently identified for both success and sustainability of EBL was culture. In contrast, there was a significant decline in salience of the leadership theme as attention shifts from success in implementation of EBL to sustaining EBL long term. Within the culture theme, accountability, and buy-in were most often cited by interviewees as success factors, while sense of accountability, buy-in, and communication were the most reported factors for sustainability. Cultural factors, such as accountability, staff support, and communication are driving forces of success and sustainability of EBL across both health systems. Leadership, a critical factor in several stages of implementation, appears to be less salient as among factors identified as important to longer term sustainability of EBL.

  3. Summary Report of Working Group 5: Beam and Radiation Generation, Monitoring, and Control

    International Nuclear Information System (INIS)

    Church, Mike; Kim, Kiyong

    2010-01-01

    This paper summarizes the activities and presentations of Working Group 5 of the Advanced Accelerator Concepts Workshop held at Annapolis, Maryland in June 2010. Working Group 5 touched on a broad range of topics in the fields of beam and radiation generation and their monitoring and control. These topics were not comprehensively covered in this Workshop, but rather the Working Group concentrated on specific new developments and recent investigations. The Working Group divided its sessions into four broad categories: cathodes and electron guns, radiation generation, beam diagnostics, and beam control and dynamics. This summary is divided into the same structure.

  4. Development of a group work assessment pedagogy using constructive alignment theory.

    Science.gov (United States)

    Croy, Suzanne R

    2018-02-01

    The purpose of this paper is to explore group work assessment underpinned by constructive alignment theory to develop a new assessment pedagogy. A review was undertaken of an existing module 'Mental Health Nursing 1', with student nurses participating in the BSc (Hons) Nursing Programme. Constructive alignment theory requires teachers to adopt a deep approach to learning where module learning outcomes are aligned with the teaching environment and modes of assessment. As the module progressed, reviewing the Mental Health Nursing 1 module became an excellent opportunity to begin to understand how constructive alignment theory can inform a group work assessment pedagogy. Working using a constructively aligned assessment process became a valuable learning experience for the module leader whilst at the same time revealed a gap in the research around the impact of constructively aligned teaching and group work assessment. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Combustion Dynamics Facility: April 1990 workshop working group reports

    Energy Technology Data Exchange (ETDEWEB)

    Kung, A.H.; Lee, Y.T.

    1990-04-01

    This document summarizes results from a workshop held April 5--7, 1990, on the proposed Combustion Dynamics Facility (CDF). The workshop was hosted by the Lawrence Berkeley Laboratory (LBL) and Sandia National Laboratories (SNL) to provide an opportunity for potential users to learn about the proposed experimental and computational facilities, to discuss the science that could be conducted with such facilities, and to offer suggestions as to how the specifications and design of the proposed facilities might be further refined to address the most visionary scientific opportunities. Some 130 chemical physicists, combustion chemists, and specialists in UV synchrotron radiation sources and free-electron lasers (more than half of whom were from institutions other than LBL and SNL) attended the five plenary sessions and participated in one or more of the nine parallel working group sessions. Seven of these sessions were devoted to broadening and strengthening the scope of CDF scientific opportunities and to detail the experimental facilities required to realize these opportunities. Two technical working group sessions addressed the design and proposed performance of two of the major CDF experimental facilities. These working groups and their chairpersons are listed below. A full listing of the attendees of the workshop is given in Appendix A. 1 tab.

  6. WICCI Wildlife Working Group Report

    Science.gov (United States)

    LeDee, Olivia E.; Hagell, Suzanne; Martin, K.; McFarland, David; Meyer, Michael; Paulios, Andy; Ribic, Christine A.; Sample, D.; Van Deelen, Timothy R.

    2013-01-01

    Wisconsin is world-renowned for its diversity of ecological landscapes and wildlife populations.  The northern forests, southern prairies, and interior and coastal wetlands of the state are home to more than 500 terrestrial animal species.  These animals supply the Wisconsin public with aesthetic, cultural, and economic benefits; our identity and economy are intertwined with these natural resources.  Climate change is altering the behavior, distribution, development, reproduction, and survival of these animal populations.  In turn, these changes will alter the aesthetic, cultural, and economic benefits we receive from them.  The focus of the Wildlife Working Group is to document past and current impacts, anticipate changes in wildlife distribution and abundance, and develop adaptation strategies to maintain the vitality and diversity of Wisconsin's wildlife populations.

  7. Report of the Working Group on Diffractive Phenomena

    International Nuclear Information System (INIS)

    Bartel, W.; Bartels, J.W.

    1994-01-01

    The discussions in the working group on diffractive processes were structured according to a scheme, in which first the experimental basis was specified followed by a presentation of theoretical papers and a general exchange of views on diffractive phenomena. Since diffraction is observed in many different channels, a common session was organised with participants from other working groups, in particular from the photoproduction and DIS community. A total of about 20 individual contributions were presented including those of the common discussion. Not all of them will be included in the proceedings. Some speakers had contributions to different sessions and submitted only one summary paper, others presented ideas for future analysis and are still working and others were too busy to finish the write up before the deadline. Diffractive phenomena observed at HERA were presented by T. Greenshaw of H1 and T. Docker from the ZEUS collaboration. The DO results on diffraction may be looked up in G. Forden's contribution to the proceedings. Further experimental results relevant to the topic ran be found in papers by M. Costa and S. Levonian issued in the photoproduction subsection. Experimentally it is not always easy to identify diffractive processes because pion and ordinary Regge exchange contributions are also present. This question is addressed in G. Levman's paper. New ideas to exploit a similarity between gluon - and Pomeron exchange were discussed by H. Kowalski, and G. Knies proposed a thrust analysis for diffractive events. In both cases work is going on which is not yet ready for a publication. (i. Ingelman reviewed existing Mt. Carlo programs on diffractive processes like POMPYT, RAPGAP and a program based on the Nikolaev - Zakharov approach to diffraction. These programs are well documented and need no further description in these proceedings. The same argument applies to V. Fadins talk, who reviewed published results on higher order corrections to the BFKL

  8. Resilience of primary healthcare professionals working in challenging environments: a focus group study.

    Science.gov (United States)

    Matheson, Catriona; Robertson, Helen D; Elliott, Alison M; Iversen, Lisa; Murchie, Peter

    2016-07-01

    The modern primary healthcare workforce needs to be resilient. Early research framed professional resilience as avoiding 'burnout'; however, more recent literature has introduced the concept of positive adaptation to professional challenges, which results in individuals thriving in their role. To explore what primary health professionals working in challenging environments consider to be characteristics of resilience and what promotes or challenges professional resilience. A qualitative focus group in north east Scotland. Five focus groups were held with 20 health professionals (six GPs, nine nurses, four pharmacists, and a practice manager) based in rural or deprived city areas in the north east of Scotland. Inductive thematic analysis identified emerging themes. Personal resilience characteristics identified were optimism, flexibility and adaptability, initiative, tolerance, organisational skills, being a team worker, keeping within professional boundaries, assertiveness, humour, and a sense of self-worth. Workplace challenges were workload, information overload, time pressures, poor communication, challenging patients, and environmental factors (rural location). Promoters of professional resilience were strong management support, teamwork, workplace buffers, and social factors such as friends, family, and leisure activities. A model of health professional resilience is proposed that concurs with existing literature but adds the concept of personal traits being synergistic with workplace features and social networks. These facilitate adaptability and enable individual health professionals to cope with adversity that is inevitably part of the everyday experience of those working in challenging healthcare environments. © British Journal of General Practice 2016.

  9. 78 FR 18624 - U.S. Extractive Industries Transparency Initiative Multi-Stakeholder Group (USEITI MSG) Advisory...

    Science.gov (United States)

    2013-03-27

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary [Docket No. ONRR-2012-0003] U.S. Extractive Industries Transparency Initiative Multi- Stakeholder Group (USEITI MSG) Advisory Committee AGENCY: Policy..., teleconference and the May 1-2, 2013, meeting of the United States Extractive Industries Transparency Initiative...

  10. Content-related interactions and methods of reasoning within self-initiated organic chemistry study groups

    Science.gov (United States)

    Christian, Karen Jeanne

    2011-12-01

    Students often use study groups to prepare for class or exams; yet to date, we know very little about how these groups actually function. This study looked at the ways in which undergraduate organic chemistry students prepared for exams through self-initiated study groups. We sought to characterize the methods of social regulation, levels of content processing, and types of reasoning processes used by students within their groups. Our analysis showed that groups engaged in predominantly three types of interactions when discussing chemistry content: co-construction, teaching, and tutoring. Although each group engaged in each of these types of interactions at some point, their prevalence varied between groups and group members. Our analysis suggests that the types of interactions that were most common depended on the relative content knowledge of the group members as well as on the difficulty of the tasks in which they were engaged. Additionally, we were interested in characterizing the reasoning methods used by students within their study groups. We found that students used a combination of three content-relevant methods of reasoning: model-based reasoning, case-based reasoning, or rule-based reasoning, in conjunction with one chemically-irrelevant method of reasoning: symbol-based reasoning. The most common way for groups to reason was to use rules, whereas the least common way was for students to work from a model. In general, student reasoning correlated strongly to the subject matter to which students were paying attention, and was only weakly related to student interactions. Overall, results from this study may help instructors to construct appropriate tasks to guide what and how students study outside of the classroom. We found that students had a decidedly strategic approach in their study groups, relying heavily on material provided by their instructors, and using the reasoning strategies that resulted in the lowest levels of content processing. We suggest

  11. Overview of the EMRAS biota dosimetry working group

    International Nuclear Information System (INIS)

    Kawaguchi, Isao; Doi, Masahiro

    2008-01-01

    Current principle of radiation protection systems is protection of human, because the human is assumed as the most sensitive organism. Protection framework of human is also believed to be effective for protection of non-human species. On the other hand, it is recently attracting the international interests how sustainability of the ecological services is influenced by environmental disturbances such as chemicals and radiation. Therefore, international concern about protection framework of nonhuman biota has arisen. By the international concern, European and American countries were respectively developed models to evaluate effects of radiation to biota. However, the models are based on their own assumptions, so that the international validity has not been confirmed. Therefore, in IAEA, biota dosimetry working group (BWG) was established in Environmental Modeling for Radiation Safety (EMRAS) program, which aimed to intercompare the models to validate their assumptions and estimations. This paper reports summary of the activity in EMRAS biota dosimetry working group. (author)

  12. Initial phase of the development of sunspot groups and their forecast

    International Nuclear Information System (INIS)

    Berlyand, B.O.; Burov, V.A.; Stepanyan, N.N.

    1979-01-01

    Some characteristics of the initial phase of sunspot groups and their forecast have been considered. Experimental data on 340 sunspot groups were obtained in 1967-1969. It was found that oscillations of the magnetic flux in the groups indicate the possibility of the existence of typical periods (2 and 4 days) of the magnetic field development. Most of the groups appears in young plages. The probability of the protons injection from the young groups is very small. The typical time of the development of the proton centre is 10-30 days. The characteristics of the group on the first day of its existence are vaguely connected with the lifetime of the group. On the second and third days the magnetic characteristics (the summary magnetic flux and the number of the unipolar regions) have the highest correlation coefficient (approximately 70%) with the lifetime of the group. The problem of the group lifetime forecast was being solved with the pattern recognition technique. On the base of the second day observation of the existence of the group verification of the received forecast 14% exceeds the verification of the climatological forecast. The forecast of the Zurich class with the same technique is effective beginning with the fifth day of the group existence and the forecast of the flare activity of the group since the day of its appearance. The exceeding of the verification as compared with the climatological forecasts in these problems is 10% and 8% accordingly

  13. The birth of NASA the work of the Space Task Group, America's first true space pioneers

    CERN Document Server

    von Ehrenfried, Dutch

    2016-01-01

    This is the story of the work of the original NASA space pioneers; men and women who were suddenly organized in 1958 from the then National Advisory Committee on Aeronautics (NACA) into the Space Task Group. A relatively small group, they developed the initial mission concept plans and procedures for the U. S. space program. Then they boldly built hardware and facilities to accomplish those missions. The group existed only three years before they were transferred to the Manned Spacecraft Center in Houston, Texas, in 1962, but their organization left a large mark on what would follow. Von Ehrenfried's personal experience with the STG at Langley uniquely positions him to describe the way the group was structured and how it reacted to the new demands of a post-Sputnik era. He artfully analyzes how the growing space program was managed and what techniques enabled it to develop so quickly from an operations perspective. The result is a fascinating window into history, amply backed up by first person documentation ...

  14. Report of the work-group on oil price volatility

    International Nuclear Information System (INIS)

    2010-01-01

    This report proposes a detailed analysis of the past and possible evolution of oil markets in terms of price volatility, financial strategies and pricing. It discusses current reflections and actions aiming at improving oil market operation: the Joint Oil Data Initiative or JODI for oil data transparency, the works of the International Energy Forum (IEF), and the conceivable reforms of the oil financial markets. Then, it proposes and discusses four main strategic orientations for a better knowledge of oil markets by France and the improvement of their operation and transparency: to support IEF initiatives, to apply to oil financial markets the global orientations defined by the G20, to set additional specific rules, and to propose a true oil strategy for the European Union. These orientations are then broken up in 22 propositions

  15. Report of working group for technical standard of cutting and melting works in Glovebox dismantling

    International Nuclear Information System (INIS)

    Asazuma, Shinichiroh; Takeda, Shinsoh; Tajima, Shoichi

    2004-11-01

    In order to prevent spread of contamination, glovebox dismantling activity is usually performed in a confined enclosure with personal radioactive protective equipment. Since large potion of these materials is made of vinyl acetate, there exist potential risks of fire, damage and injury to the environment and workers during the dismantling (cutting or melting) operation. It is therefore important to establish standard for proper use of equipment and hazard controls in such a specific environment. Working Group composed of Tokai Works and Oarai Works has examined and developed the operational standard for cutting work in glovebox dismantlement. The result is reflected to the Tokai Works Safety Operational Standard. (author)

  16. Small arms proliferation. Report on working group 2

    International Nuclear Information System (INIS)

    1998-01-01

    The working group reported on the proliferation of small arms, light weapons non-lethal weapons, which have traditionally been given little attention in international talks on peace on the contrary to nuclear weapons which have been tested during the Second World War but never used in war later

  17. The Powell Volcano Remote Sensing Working Group Overview

    Science.gov (United States)

    Reath, K.; Pritchard, M. E.; Poland, M. P.; Wessels, R. L.; Biggs, J.; Carn, S. A.; Griswold, J. P.; Ogburn, S. E.; Wright, R.; Lundgren, P.; Andrews, B. J.; Wauthier, C.; Lopez, T.; Vaughan, R. G.; Rumpf, M. E.; Webley, P. W.; Loughlin, S.; Meyer, F. J.; Pavolonis, M. J.

    2017-12-01

    Hazards from volcanic eruptions pose risks to the lives and livelihood of local populations, with potential global impacts to businesses, agriculture, and air travel. The 2015 Global Assessment of Risk report notes that 800 million people are estimated to live within 100 km of 1400 subaerial volcanoes identified as having eruption potential. However, only 55% of these volcanoes have any type of ground-based monitoring. The only methods currently available to monitor these unmonitored volcanoes are space-based systems that provide a global view. However, with the explosion of data techniques and sensors currently available, taking full advantage of these resources can be challenging. The USGS Powell Center Volcano Remote Sensing Working Group is working with many partners to optimize satellite resources for global detection of volcanic unrest and assessment of potential eruption hazards. In this presentation we will describe our efforts to: 1) work with space agencies to target acquisitions from the international constellation of satellites to collect the right types of data at volcanoes with forecasting potential; 2) collaborate with the scientific community to develop databases of remotely acquired observations of volcanic thermal, degassing, and deformation signals to facilitate change detection and assess how these changes are (or are not) related to eruption; and 3) improve usage of satellite observations by end users at volcano observatories that report to their respective governments. Currently, the group has developed time series plots for 48 Latin American volcanoes that incorporate variations in thermal, degassing, and deformation readings over time. These are compared against eruption timing and ground-based data provided by the Smithsonian Institute Global Volcanism Program. Distinct patterns in unrest and eruption are observed at different volcanoes, illustrating the difficulty in developing generalizations, but highlighting the power of remote sensing

  18. Standard compensation for power cuts. Working group report

    International Nuclear Information System (INIS)

    2002-07-01

    The Working Group was commissioned to draw up a proposal in the form of a Government Bill for provisions to be included in the Electricity Market Act on imposing an obligation on the distribution net operator to pay a standard compensation to the users of electricity for the event that they get no access to electricity. The Working Group should consider especially a model of standard compensation presented in the final report by Mr. Jarl Forsten, Deputy Director General of the Technical Research Centre of Finland VTT, published on 30 April 2002 that the amount of standard compensation should not depend on the reason for the power cut. The Working Group proposes that the Electricity Market Act should be amended by provisions providing that a distribution net operator shall pay to the user of electricity a standard compensation for power cuts lasting over 12 hours. The amount of compensation shall be based on the annual network service fee and a sliding scale of compensation related to the duration of the power cut shall be applied. The maximum compensation shall be paid when the power cut lasts more than five days. The maximum amount of individual compensations shall be fixed at EUR 700. The proposed provisions on standard compensation in the event of power cuts are aimed at amending the provisions in Chapter 6a of the Electricity Market Act on price reduction and compensation because of fault in the supply of electricity. The aim of the introduction of standard compensation for power cuts is to persuade distribution net operators to make an effort to minimize the time for power cuts. (orig.)

  19. Solidarity Economy, Mental Health and the practice of occupational therapists: reports of participants of a group to generate work and income

    Directory of Open Access Journals (Sweden)

    Luís Felipe Ferro

    2015-03-01

    Full Text Available The repositioning of mental health care in Brazil proposes actions for user support in a variety of territorial attention equipment. Labor inclusion has been widely discussed in mental health public policy, with remarkable proliferation of groups of work and income generation and cooperatives to serve this population. This article seeks to explore the potential and difficulties of an income generation group which produces bags with reused banners, based on the assumptions of Solidarity Economy, born with the partnership between the Occupational Therapy Course of the Federal University of Paraná and ‘Arnaldo Gilberti’ Association. The present study uses a dual methodological approach: a critical case report of the three-year experience with this income generation group; and a qualitative exploratory field research. Data was collected through unstructured interviews applied to eight subjects who had attended the income generation group for at least six months. Data analysis consisted of examining, categorizing, tabulating and recombining the evidence, using hermeneutic dialectic analysis. Four categories were identified: Solidarity Economy, social inclusion and self-management: opening of the perception of users; Pragmatics of the Work and Income Generation Group in Mental Health: strategies for strengthening the initiative; Work and Income Generation: between referrals and the concise structuring of Singular Therapeutic Projects; Solidarity Economy and the work and income generation group: between empowerment and ideology. The results of this research reveal that actions must be taken to pragmatize concepts such as social inclusion and solidarity

  20. The Work-Related Flow Inventory: Construction and Initial Validation of the WOLF

    Science.gov (United States)

    Bakker, Arnold B.

    2008-01-01

    The WOrk-reLated Flow inventory (WOLF) measures flow at work, defined as a short-term peak experience characterized by absorption, work enjoyment, and intrinsic work motivation. Results of Study 1 among 7 samples of employees (total N=1346) from different occupational groups offer support for the factorial validity and reliability of the WOLF.…

  1. 78 FR 64525 - U.S. Extractive Industries Transparency Initiative Multi-Stakeholder Group (USEITI MSG) Advisory...

    Science.gov (United States)

    2013-10-29

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary [Docket No. ONRR-2012-0003; DS63600000 DR2PS0000.PX8000 134D0102R2] U.S. Extractive Industries Transparency Initiative Multi- Stakeholder Group...: This notice announces the rescheduling of the U.S. Extractive Industries Transparency Initiative...

  2. Summary of the Physics Opportunities Working Group

    International Nuclear Information System (INIS)

    Chen, Pisin; McDonald, K.T.

    1992-12-01

    The Physics Opportunities Working Group was convened with the rather general mandate to explore physic opportunities that may arise as new accelerator technologies and facilities come into play. Five topics were considered during the workshop: QED at critical field strength, novel positron sources, crystal accelerators, suppression of beamstrahlung, and muon colliders. Of particular interest was the sense that a high energy muon collider might be technically feasible and certainly deserves serious study

  3. Nonaccelerator physics working group summary

    International Nuclear Information System (INIS)

    Ayres, D.S.; Beier, E.W.; Cherry, M.L.; Marciano, W.J.

    1986-01-01

    The Nonaccelerator Physics Working Group set itself the task of predicting the contributions of nonaccelerator experiments to particle physics during the 1990s, in order to assess the needs for new experimental facilities. The main topics studied by the subgroups were: (1) the possibility of doing particle physics experiments with high energy cosmic rays from astrophysical sources; (2) the prospects for experiments which seek to measure the masses of neutrinos and the mixing of neutrino flavors; (3) an examination of the implications for proton decay of recent theoretical developments in grand unified and string theories. Other topics included a survey of magnetic monopole searches, an assessment of future prospects for double-beta-decay and nucleon-decay experiments, and a review of recent progress on neutrino and dark-matter detectors based on quasiparticles in superconductors and phonons in crystals

  4. Applying an Activity System to Online Collaborative Group Work Analysis

    Science.gov (United States)

    Choi, Hyungshin; Kang, Myunghee

    2010-01-01

    This study determines whether an activity system provides a systematic framework to analyse collaborative group work. Using an activity system as a unit of analysis, the research examined learner behaviours, conflicting factors and facilitating factors while students engaged in collaborative work via asynchronous computer-mediated communication.…

  5. Charter for Systems Engineer Working Group

    Science.gov (United States)

    Suffredini, Michael T.; Grissom, Larry

    2015-01-01

    This charter establishes the International Space Station Program (ISSP) Mobile Servicing System (MSS) Systems Engineering Working Group (SEWG). The MSS SEWG is established to provide a mechanism for Systems Engineering for the end-to-end MSS function. The MSS end-to-end function includes the Space Station Remote Manipulator System (SSRMS), the Mobile Remote Servicer (MRS) Base System (MBS), Robotic Work Station (RWS), Special Purpose Dexterous Manipulator (SPDM), Video Signal Converters (VSC), and Operations Control Software (OCS), the Mobile Transporter (MT), and by interfaces between and among these elements, and United States On-Orbit Segment (USOS) distributed systems, and other International Space Station Elements and Payloads, (including the Power Data Grapple Fixtures (PDGFs), MSS Capture Attach System (MCAS) and the Mobile Transporter Capture Latch (MTCL)). This end-to-end function will be supported by the ISS and MSS ground segment facilities. This charter defines the scope and limits of the program authority and document control that is delegated to the SEWG and it also identifies the panel core membership and specific operating policies.

  6. Summary Report of Working Group 2: Computation

    International Nuclear Information System (INIS)

    Stoltz, P. H.; Tsung, R. S.

    2009-01-01

    The working group on computation addressed three physics areas: (i) plasma-based accelerators (laser-driven and beam-driven), (ii) high gradient structure-based accelerators, and (iii) electron beam sources and transport [1]. Highlights of the talks in these areas included new models of breakdown on the microscopic scale, new three-dimensional multipacting calculations with both finite difference and finite element codes, and detailed comparisons of new electron gun models with standard models such as PARMELA. The group also addressed two areas of advances in computation: (i) new algorithms, including simulation in a Lorentz-boosted frame that can reduce computation time orders of magnitude, and (ii) new hardware architectures, like graphics processing units and Cell processors that promise dramatic increases in computing power. Highlights of the talks in these areas included results from the first large-scale parallel finite element particle-in-cell code (PIC), many order-of-magnitude speedup of, and details of porting the VPIC code to the Roadrunner supercomputer. The working group featured two plenary talks, one by Brian Albright of Los Alamos National Laboratory on the performance of the VPIC code on the Roadrunner supercomputer, and one by David Bruhwiler of Tech-X Corporation on recent advances in computation for advanced accelerators. Highlights of the talk by Albright included the first one trillion particle simulations, a sustained performance of 0.3 petaflops, and an eight times speedup of science calculations, including back-scatter in laser-plasma interaction. Highlights of the talk by Bruhwiler included simulations of 10 GeV accelerator laser wakefield stages including external injection, new developments in electromagnetic simulations of electron guns using finite difference and finite element approaches.

  7. Facilitating Support Groups for Professionals Working with People with AIDS.

    Science.gov (United States)

    Grossman, Arnold H.; Silverstein, Charles

    1993-01-01

    Describes support groups for health care professionals who work with people with human immunodeficiency virus (HIV) or Acquired Immune Deficiency Syndrome (AIDS) and who are experiencing burnout from excessive demands on their energy, strength, and resources. Discusses group administration, effective intervention techniques, and issues of health…

  8. Understanding the Process by Which New Employees Enter Work Groups

    Science.gov (United States)

    Summers, Donald B.

    1977-01-01

    The Group Integration Process, described in this article, serves as a broad and guiding set of steps (invitation, induction, orientation, training, relationship, and integration) that helps the supervisor better understand what is to be done in managing a new employee's entrance into a work group. (TA)

  9. Final Report of the Advanced Coal Technology Work Group

    Science.gov (United States)

    The Advanced Coal Technology workgroup reported to the Clean Air Act Advisory Committee. This page includes the final report of the Advanced Coal Technology Work Group to the Clean Air Act Advisory Committee.

  10. Taking stock of work-family initiatives: How announcements of "family-friendly" human resource decisions affect shareholder value.

    OpenAIRE

    Michelle M. Arthur; Alison Cook

    2004-01-01

    This study examines share price reactions to 231 work-family human resource policies adopted by Fortune 500 companies and announced in the Wall Street Journal between 1971 and 1996. Consistent with past research, the results suggest that firm announcements of work-family initiatives positively affected shareholder return. The authors also empirically test three hypotheses concerning how the timing of work-family initiatives influences shareholder reaction. They find that a pioneering company ...

  11. Statement of work for architect-engineer services, initial pretreatment module

    International Nuclear Information System (INIS)

    Sowa, K.B.

    1994-01-01

    This Statement of Work describes the Architect-Engineer services to be provided by Raytheon/BNFL in providing a conceptual design (Contract TGW-SVV-063869) for the Initial Pretreatment Module (IPM), Project W-236B, at the Hanford site, Richland, Washington. The IPM Project, a radiochemical process facility, will be designed and constructed for an initial phase of waste pretreatment, which will be for the removal of cesium from supernatant wastes to produce a Low-level waste (LLW) stream to a vitrification facility. The design shall also accommodate side streams of High-Level Waste (HLW) fractions that will be directed to suitable, existing storage tanks where they will be recombined with an additional high-activity waste fraction generated from pretreatment of the tank waste sludges and solids. This combined high-activity waste fraction will be immobilized as glass and disposed in a geological repository

  12. The 3rd Asia–Pacific Transport Working Group (APTWG) Meeting

    International Nuclear Information System (INIS)

    Jhang, Hogun; Diamond, P.H.; Leconte, M.; Kwon, J.M.; Ida, K.; Tamura, N.; Kosuga, Y.

    2014-01-01

    This conference report summarizes the contributions to and discussions at the 3rd Asia–Pacific Transport Working Group (APTWG) meeting held in Jeju-island, Korea, on 21–24 May 2013. The main objective of the meeting is to develop a predictive understanding of transport mechanisms in magnetically confined fusion plasmas. In an effort to accomplish this objective, four technical working groups were organized under the headings: (1) transport barrier formation and confinement enhancement, (2) 3D effects and Magnetohydrodynamic–turbulence interaction, (3) momentum transport and non-locality and (4) particle/impurity transport and energetic particles. (conference report)

  13. Enhancing the Effectiveness of Work Groups and Teams: A Reflection.

    Science.gov (United States)

    Kozlowski, Steve W J

    2018-03-01

    Teamwork has been at the core of human accomplishment across the millennia, and it was a focus of social psychological inquiry on small group behavior for nearly half a century. However, as organizations world-wide reorganized work around teams over the past two decades, the nature of teamwork and factors influencing it became a central focus of research in organizational psychology and management. In this article, I reflect on the impetus, strategy, key features, and scientific contribution of "Enhancing the Effectiveness of Work Groups and Teams," by Kozlowski and Ilgen, a review monograph published in Psychological Science in the Public Interest in 2006.

  14. Summary of the accelerator working group

    International Nuclear Information System (INIS)

    Ankenbrandt, C.; Noble, R.J.

    1998-03-01

    We present a summary of the main topics discussed in the Accelerator Working Group during the ''Workshop on the Physics at the First Muon Collider''. The discussions centered on critical design issues for a high-intensity, medium-energy proton synchrotron that would replace the present Fermilab 8 GeV Booster early in the next century. Such a machine is intended both to serve the hadron program with an order of magnitude increase in average proton current and to be compatible as a source for a future muon collider. Particular issues discussed at length include rf system design, control of longitudinal space-charge effects, bunching of proton beams and beam instabilities

  15. The PDF4LHC Working Group Interim Report

    CERN Document Server

    Alekhin, Sergey; Ball, Richard D.; Bertone, Valerio; Blumlein, Johannes; Botje, Michiel; Butterworth, Jon; Cerutti, Francesco; Cooper-Sarkar, Amanda; de Roeck, Albert; Del Debbio, Luigi; Feltesse, Joel; Forte, Stefano; Glazov, Alexander; Guffanti, Alberto; Gwenlan, Claire; Huston, Joey; Jimenez-Delgado, Pedro; Lai, Hung-Liang; Latorre, Jose I.; McNulty, Ronan; Nadolsky, Pavel; Olaf Moch, Sven; Pumplin, Jon; Radescu, Voica; Rojo, Juan; Sjostrand, Torbjorn; Stirling, W.J.; Stump, Daniel; Thorne, Robert S.; Ubiali, Maria; Vicini, Alessandro; Watt, Graeme; Yuan, C.-P.

    2011-01-01

    This document is intended as a study of benchmark cross sections at the LHC (at 7 TeV) at NLO using modern parton distribution functions currently available from the 6 PDF fitting groups that have participated in this exercise. It also contains a succinct user guide to the computation of PDFs, uncertainties and correlations using available PDF sets. A companion note, also submitted to the archive, provides an interim summary of the current recommendations of the PDF4LHC working group for the use of parton distribution functions and of PDF uncertainties at the LHC, for cross section and cross section uncertainty calculations.

  16. Report of the Working Group on Far Field Accelerators

    International Nuclear Information System (INIS)

    Cha-Mei Tang

    1992-01-01

    This report describes the accomplishments of the Working Group on Far Field Accelerators. In addition to hearing presentations of current research, the group produced designs for ''100 MeV'' demonstration accelerators, ''1 GeV'' conceptual accelerators and a small electron beam source. Two of the ''100 MeV'' designs, an Inverse Free Electron Laser (IFEL) and an Inverse Cerenkov Accelerator (ICA), use the CO 2 laser and the 50 MeV linac at the Advanced Test Facility (ATF) at Brookhaven National Laboratory (BNL), requiring only modest changes in the current experimental setups. By upgrading the laser, an ICA design demonstrated 1 GeV acceleration in a gas cell about 50 cm in length. For high average power accelerators, examples based on the IFEL concept were also produced utilizing accelerators driven by high average power FELs. The Working Group also designed a small electron beam source based on the inverse electron cyclotron resonance concept. Accelerators based on the IFEL and ICA may be the first to achieve ''100 MeV'' and ''1 GeV'' energy gain demonstration with high accelerating gradients

  17. Classical Hodgkin's lymphoma in adults: guidelines of the Italian Society of Hematology, the Italian Society of Experimental Hematology, and the Italian Group for Bone Marrow Transplantation on initial work-up, management, and follow-up.

    Science.gov (United States)

    Brusamolino, Ercole; Bacigalupo, Andrea; Barosi, Giovanni; Biti, Giampaolo; Gobbi, Paolo G; Levis, Alessandro; Marchetti, Monia; Santoro, Armando; Zinzani, Pier Luigi; Tura, Sante

    2009-04-01

    The Italian Society of Hematology (SIE), the Italian Society of Experimental Haematology (SIES) and the Italian Group for Bone Marrow Transplantation (GITMO) commissioned a project to develop practice guidelines for the initial work-up, therapy and follow-up of classical Hodgkin's lymphoma. Key questions to the clinical evaluation and treatment of this disease were formulated by an Advisory Committee, discussed and approved by an Expert Panel (EP) composed of senior hematologists and one radiotherapist. After a comprehensive and systematic literature review, the EP recommendations were graded according to their supporting evidence. An explicit approach to consensus methodologies was used for evidence interpretation and for producing recommendations in the absence of a strong evidence. The EP decided that the target domain of the guidelines should include only classical Hodgkin's lymphoma, as defined by the WHO classification, and exclude lymphocyte predominant histology. Distinct recommendations were produced for initial work-up, first-line therapy of early and advanced stage disease, monitoring procedures and salvage therapy, including hemopoietic stem cell transplant. Separate recommendations were formulated for elderly patients. Pre-treatment volumetric CT scan of the neck, thorax, abdomen, and pelvis is mandatory, while FDG-PET is recommended. As to the therapy of early stage disease, a combined modality approach is still recommended with ABVD followed by involved-field radiotherapy; the number of courses of ABVD will depend on the patient risk category (favorable or unfavorable). Full-term chemotherapy with ABVD is recommended in advanced stage disease; adjuvant radiotherapy in patients without initial bulk who achieved a complete remission is not recommended. In the elderly, chemotherapy regimens more intensive than ABVD are not recommended. Early evaluation of response with FDG-PET scan is suggested. Relapsed or refractory patients should receive high

  18. Synthesis of the working group discussions

    International Nuclear Information System (INIS)

    2003-01-01

    activities. In coming years, a greater emphasis on EBS integrity issues can be expected within SKI's long-term programme for gradual development of review capability. In the autumn of 2004, an additional EBS workshop is planned, which will focus on EBS component quality and the expected initial state of the EBS. Subsequently, specialised workshops are planned for more detailed insight in selected areas, targeting issue resolution as well as identification. A few of the technical issues that received considerable attention during the workshop are noted below: The performance assessment need to contain a description of the initial state of the system that can be regarded as realistic rather than idealised. In particular, the characterisation and statistical analysis of both large and small defects in the weldments of the copper canister has to be rigorous. The long-term experiments aimed at demonstrating feasibility of the KBS-3 concept have to be reviewed in more detail. It was suggested that SKB consider whether the present programme needs to be extended. SKB needs to present a plan for monitoring during repository operation. One of the working groups recommended that SKB should set up a demonstration tunnel in the repository, which would be dismantled and examined, with the purpose of performance confirmation prior to sealing the repository. The understanding of the resaturation phase for the buffer needs to be improved. Preliminary results indicate that the resaturation phase may be more extended that previously anticipated. In addition, an uneven resaturation of the buffer may result in localised stress transfer to the canister. All conceivable implications of an extended or uneven resaturation phase has to be evaluated, if they cannot be very convincingly ruled out, e.g. thermal gradients across the buffer may lead to mass transfer of chemical components, and consequently variations in thermal, hydrological and mechanical properties. More data is needed for evaluation of

  19. The role of bridging organizations in environmental management: examining social networks in working groups

    Directory of Open Access Journals (Sweden)

    Adam A. Kowalski

    2015-06-01

    Full Text Available The linkage of diverse sets of actors and knowledge systems across management levels and institutional boundaries often poses one of the greatest challenges in adaptive management of natural resources. Bridging organizations can facilitate interactions among actors in management settings by lowering the transaction costs of collaboration. The Center for Ocean Solutions (COS is an example of a bridging organization that is focused on linking actors within the ocean sciences and governance arena through the use of working groups. This research examines how network connections between group members affect working group functionality and, more specifically, whether cohesive network structures allow groups to more effectively achieve their goals and objectives. A mixed-methods approach, incorporating both qualitative and quantitative data collection and analysis methods, is employed to understand the structural characteristics of COS working groups. The study finds that cohesive network structures are not associated with increased working group functionality. Strong, centralized leadership is a better predictor of working group success in achieving goals and objectives.

  20. The positive group affect spiral : a dynamic model of the emergence of positive affective similarity in work groups

    NARCIS (Netherlands)

    Walter, F.; Bruch, H.

    This conceptual paper seeks to clarify the process of the emergence of positive collective affect. Specifically, it develops a dynamic model of the emergence of positive affective similarity in work groups. It is suggested that positive group affective similarity and within-group relationship

  1. Gender-heterogeneous working groups produce higher quality science.

    Directory of Open Access Journals (Sweden)

    Lesley G Campbell

    Full Text Available Here we present the first empirical evidence to support the hypothesis that a gender-heterogeneous problem-solving team generally produced journal articles perceived to be higher quality by peers than a team comprised of highly-performing individuals of the same gender. Although women were historically underrepresented as principal investigators of working groups, their frequency as PIs at the National Center for Ecological Analysis and Synthesis is now comparable to the national frequencies in biology and they are now equally qualified, in terms of their impact on the accumulation of ecological knowledge (as measured by the h-index. While women continue to be underrepresented as working group participants, peer-reviewed publications with gender-heterogeneous authorship teams received 34% more citations than publications produced by gender-uniform authorship teams. This suggests that peers citing these publications perceive publications that also happen to have gender-heterogeneous authorship teams as higher quality than publications with gender uniform authorship teams. Promoting diversity not only promotes representation and fairness but may lead to higher quality science.

  2. Gender-heterogeneous working groups produce higher quality science.

    Science.gov (United States)

    Campbell, Lesley G; Mehtani, Siya; Dozier, Mary E; Rinehart, Janice

    2013-01-01

    Here we present the first empirical evidence to support the hypothesis that a gender-heterogeneous problem-solving team generally produced journal articles perceived to be higher quality by peers than a team comprised of highly-performing individuals of the same gender. Although women were historically underrepresented as principal investigators of working groups, their frequency as PIs at the National Center for Ecological Analysis and Synthesis is now comparable to the national frequencies in biology and they are now equally qualified, in terms of their impact on the accumulation of ecological knowledge (as measured by the h-index). While women continue to be underrepresented as working group participants, peer-reviewed publications with gender-heterogeneous authorship teams received 34% more citations than publications produced by gender-uniform authorship teams. This suggests that peers citing these publications perceive publications that also happen to have gender-heterogeneous authorship teams as higher quality than publications with gender uniform authorship teams. Promoting diversity not only promotes representation and fairness but may lead to higher quality science.

  3. Reports from the working group on neutron scattering

    International Nuclear Information System (INIS)

    1979-06-01

    The present report contains papers dating from July 1978 until May 1979. During this period the experimental facilities have been expanded; a new four-circuit neutron spectrometer was installed and, together with the Fritz Hafer Institute, a measuring point was set up for investigations of ideal crystals, the Compton scattering equipment has been essentially improved. The report contains a contribution on the mechanics and the control of the neutron diffractometers existing at BER II. The main subjects of the scientific research work were magnetic structures and phase transitions, electron densities and chemical bonds, structure and dynamics of molecular crystals. At the BER II reactor measuring opportunities could be offered to a number of guest groups. Their research activities are reported, too. In addition to those made at the Berlin reactor BER II measurements could be made at the accelerator VICKSI of the Hahn-Meitner Institute and at the reactors of the Institute Laue-Langevin at Grenoble and of the Research Establishment at Riso by the working groups. (orig.) [de

  4. COSPAR/PRBEM international working group activities report

    Science.gov (United States)

    Bourdarie, S.; Blake, B.; Cao, J. B.; Friedel, R.; Miyoshi, Y.; Panasyuk, M.; Underwood, C.

    It is now clear to everybody that the current standard AE8 AP8 model for ionising particle specification in the radiation belts must be updated But such an objective is quite difficult to reach just as a reminder to develop AE8 AP8 model in the seventies was 10 persons full time for ten years It is clear that world-wide efforts must be combined because not any individual group has the human resource to perform these new models by themselves Under COSPAR umbrella an international group of expert well distributed around the world has been created to set up a common framework for everybody involved in this field Planned activities of the international group of experts are to - Define users needs - Provide guidelines for standard file format for ionising measurements - Set up guidelines to process in-situ data on a common basis - Decide in which form the new models will have to be - Centralise all progress done world-wide to advise the community - Try to organise world-wide activities as a project to ensure complementarities and more efficiencies between all efforts done Activities of this working group since its creation will be reported as well as future plans

  5. Biosphere scenario development. An interim report of an SKI, SSI, SKB working group

    International Nuclear Information System (INIS)

    1989-11-01

    The Swedish Nuclear Power Inspectorate and the Swedish Nuclear Fuel and Waste Management Co have initiated a project for the development of scenarios for the behaviour of radionuclides in high level waste following deep geological disposal. The main objective is to develop a general consensus of scenarios and conceptual models. Within the project a biosphere scenarios working group was initiated to consider specific questions of the biosphere. This report describes the results of the group's deliberations up to the end of July 1989. A methodology is presented for the development of biosphere scenarios which may be considered alongside scenarios for radionuclide behaviour in the near field and geosphere. Two major biosphere elements affecting processes in the surface environment have been recognised, climate and development. Alternative states for climate and level of development are suggested and each combination can be considered with one or more of a range of biosphere receptors, such as a river or a lake. The features, events and processes relevant to each receptor are presented. Consideration is then given to biosphere assumptions for both gradual and direct releases from the geosphere, as well as biosphere effects on the repository near field or geosphere. The amount of screening which can be done at this stage to limit the number of biosphere scenarios is small. However, considerable potential exists once more details are available for geosphere release scenarios. It may be appropriate to further develop biosphere scenarios, specific to each geosphere release scenario. It may also be appropriate to consider scenarios specifically in relation to the individual radionuclides which dominate geosphere releases. Both these possibilities could result in considerably reduced requirements for calculations

  6. Group dream work as a support for self – awareness

    OpenAIRE

    Brumen Žarn, Zarja

    2016-01-01

    Master's thesis discusses group dream work as a form of support for increasing the individual's self-awareness. Working with dreams encourages creativity, opens up the possibilities of self-knowing and helps individuals to guide their life paths. One of the fundamental concepts of social pedagogy is the empowerment of individuals for problem solving and self-development. For this purpose, social educational profession develops and uses a number of methods and approaches. Working with dreams i...

  7. Online Group Work Design: Processes, Complexities, and Intricacies

    Science.gov (United States)

    Kleinsasser, Robert; Hong, Yi-Chun

    2016-01-01

    This paper describes the challenges of designing and implementing online group work. We are responsible for a seven-and-a-half week's online literacy and bi-literacy graduate course in a Bilingual/English as a Second Language (BLE/ESL) Master of Arts program. One of the tasks includes online literacy circle exchanges where students are encouraged…

  8. Annual report to the Working Group on Technology, Growth, and Employment

    International Nuclear Information System (INIS)

    1985-04-01

    A meeting of the Working Group on High Energy Physics was convened in Brussels, Belgium, in July 1984, and impaneled new groups of technical experts to report on long-term planning, technical collaborations, and the identification of administrative obstacles experienced within the Summit countries that impede international collaboration. The charges to these three new groups are contained in this report under the section on the Brussels meeting. The reports prepared by the technical experts were then reviewed at the January 1985 meeting at Cadarache, France, and the results are contained in this report under the section on the Cadarache meeting. The Summit Working Group on High Energy Physics believes progress is being made toward cooperation among the Summit countries in the exploration of scientific and technological development upon which the Summit Heads of State and Government declared at Versailles revitalization and growth of the world economy will depend - to a large extent. At Cadarache, the Group found that, since its establishment, international collaboration has increased in the use of present accelerators and in the planning for future accelerators. The Group also found that there are specific areas of technology in which near-term research cooperation is possible. Finally, the Group identified administrative regulations that hamper effective international collaboration in science and technology and that could be revised or eliminated through coordinated, high level Summit action. The major accomplishment of the Working Group thus far has been the creation of a forum for discussions on collaboration in a major field of science by seven industrialized countries. The Group recommends the continuation of its review of long-term plans for major facilities on an intergovernmental basis

  9. Summary of Working Group 3: Machine Design and R and D

    International Nuclear Information System (INIS)

    Ohmori, C.; Kirk, H.; Haseroth, H.

    2006-01-01

    Various topics on machine studies and component R and D for Neutrino Factory subsystems were discussed in Working Group 3 (WG3) at the NuFact05 Workshop. In this working group, 29 talks and 2 posters were presented. We also had special focus sessions for lively discussions on several important issues; targets, cooling, proton driver, FFAGs and acceleration, and a World Wide Design study. Joint Sessions were held with WG1 and WG4 on machine requirements

  10. Attitudes of Jordanian Students Towards Using Group Work in EFL Classrooms

    Directory of Open Access Journals (Sweden)

    Sana' Ababneh

    2017-02-01

    Full Text Available This paper addresses itself to the outcomes of a field study which was carried out to identify Jordanian EFL students' attitudes towards using group work in EFL classrooms. The study sample consisted of 179 students enrolled in English 101, an elementary language skills course taught at Al- Huson University College, Al -Balqa' Applied University, Jordan. A questionnaire was used to investigate the subjects' attitudes. The findings show that approximately two-thirds of the participants are either very extrovert or somewhat extrovert, i.e. they have positive attitudes towards participating in group work in EFL classes. In contrast, only a third are either somewhat introvert or very introvert, i.e., they do not like to take part in group work in EFL classes. Moreover, the data show that neither the subjects' gender nor their secondary school stream (vocational, scientific, or literary has any significant effect on their preferences.

  11. Drama and Role Playing in Teaching Practice: The Role of Group Works

    Science.gov (United States)

    Çerkez, Yagmur; Altinay, Zehra; Altinay, Fahriye; Bashirova, Elnara

    2012-01-01

    The research study aims to explore the essence of group work in drama and role playing for teaching practice inline with the nature of collaborative learning process. This research study has qualitative nature by capturing experiences of volunteer ninety pre-service teachers about group works, gained skills from drama and role playing in their…

  12. Initial report of the ITER Council's Ways and Means Working Party

    International Nuclear Information System (INIS)

    1990-01-01

    Under the auspices of the IAEA, the ITER Conceptual Design Activities began in April, 1988, and are scheduled to be completed in December, 1990. As part of the Terms of Reference of the ITER Conceptual Design Activities, the ITER Council chartered a Working Party which plans to define needed elements to conduct an Engineering Design of ITER, should the members wish to go on with such design. This document is an initial report of the Working Party on Ways and Means; it seeks to define the Engineering Design Activities, and to list the practical topics to be considered by the ITER EDA. 2 figs, 4 tabs

  13. Fuzzy Group Decision Making Approach for Ranking Work Stations Based on Physical Pressure

    Directory of Open Access Journals (Sweden)

    Hamed Salmanzadeh

    2014-06-01

    Full Text Available This paper proposes a Fuzzy Group Decision Making approach for ranking work stations based on physical pressure. Fuzzy group decision making approach allows experts to evaluate different ergonomic factors using linguistic terms such as very high, high, medium, low, very low, rather than precise numerical values. In this way, there is no need to measure parameters and evaluation can be easily made in a group. According to ergonomics much work contents and situations, accompanied with multiple parameters and uncertainties, fuzzy group decision making is the best way to evaluate such a chameleon of concept. A case study was down to utilize the approach and illustrate its application in ergonomic assessment and ranking the work stations based on work pressure and found that this approach provides flexibility, practicality, efficiency in making decision around ergonomics areas. The normalized defuzzification numbers which are resulted from this method are compared with result of quantitative assessment of Automotive Assembly Work Sheet auto, it’s demonstrated that the proposed method result is 10% less than Automotive Assembly Work Sheet, approximately.

  14. Deliberations of working group 3: stakeholders and the public: who are they?

    International Nuclear Information System (INIS)

    Webster, S.

    2000-01-01

    The working-group deliberations opened with a general discussion centred primarily around the issues introduced in the two papers presented that morning in plenary session: 'Who Are Stakeholders in Environmental Risk Decisions?' and 'Participation of Stakeholders in Waste Management Decisions: The German Experience'. In general, the interventions by the group were open and frank and adequately covered the key issues of the subject. This was followed by a presentation on the views and experience of the current siting debate in Sweden from the perspective of the regulatory bodies and a brief summary by the Chairman of the definition of the public in EU legislation and International Conventions. The majority of the working-group members contributed actively to the debate, and the discussions were conducted in an informal and open-minded manner. Hereinafter are the main observations made during the working group deliberations. (author)

  15. Organizational Initiatives for Promoting Employee Work-Life Reconciliation Over the Life Course. A Systematic Review of Intervention Studies

    Directory of Open Access Journals (Sweden)

    Annina Ropponen

    2016-10-01

    Full Text Available This review aimed to explore the initiatives, interventions, and experiments implemented by employing organizations and designed to support the work-life reconciliation at workplaces, and the effects of these actions on employees’ well-being at work. A systematic literature review was conducted on the basis of a search in PsycInfo, ERIC, and the ISI Web of Science database of Social Sciences between January 2000 and May 2015. Those studies were included in which either organizational or individual-level initiatives, interventions, or experiments were implemented by employers at workplaces in order to promote the work-life reconciliation of their employees. Work-life reconciliation was considered to encompass all life domains and all career stages from early to the end of working career. The content analysis of 11 studies showed that effective employer actions focused on working time, care arrangements, and training for supervisors and employees. Flexibility, in terms of both working time and other arrangements provided for employees, and support from supervisors decreased work-family conflict, improved physical health and job satisfaction, and also reduced the number of absence days and turnover intentions. Overall, very few intervention studies exist investigating the effects of employer-induced work-life initiatives. One should particularly note the conditions under which interventions are most successful, since many contextual and individual-level factors influence the effects of organizational initiatives on employee and organizational outcomes.

  16. Follow-up on initiatives taken by the TMAP ad hoc working group fish in 2006

    NARCIS (Netherlands)

    Bolle, L.J.

    2006-01-01

    Since 1978, The Netherlands, Denmark and Germany have been working together on the protection and conservation of the Wadden Sea covering management, monitoring and research, and political matters. An important element of the Trilateral Cooperation with regards to monitoring and research is the

  17. Benchmark shielding calculations for the NEACRP [Nuclear Energy Agency-Committee on Reactor Physics] Working Group on shielding assessment of transportation packages

    International Nuclear Information System (INIS)

    Broadhead, B.L.; Brady, M.C.; Parks, C.V.

    1990-11-01

    In 1985, the Nuclear Energy Agency-Committee on Reactor Physics (NEACRP) established a working group on shielding assessment of transportation packages. Following the initial distribution of a set of six problems, discussions were held at the Organization for Economic Cooperation and Development (OECD) Headquarters in Paris, France, in June/July 1986, May 1988, and February/March 1990. The US contribution to the working group is documented in this report. The results from this effort permit the evaluation of a number of approximations and effects that must be considered in a typical shielding analysis of a transportation cask. Among the effects reported here are the performance of multiple cross-section sets, the comparison of several source generation codes, and multidimensional versus one-dimensional (1-D) analyses. 18 refs., 16 figs., 33 tabs

  18. Introduction of the UNIX International Performance Management Work Group

    Science.gov (United States)

    Newman, Henry

    1993-01-01

    In this paper we presented the planned direction of the UNIX International Performance Management Work Group. This group consists of concerned system developers and users who have organized to synthesize recommendations for standard UNIX performance management subsystem interfaces and architectures. The purpose of these recommendations is to provide a core set of performance management functions and these functions can be used to build tools by hardware system developers, vertical application software developers, and performance application software developers.

  19. Trans-Agency Early-Life Exposures and Cancer Working Group

    Science.gov (United States)

    The Trans-Agency Early-Life Exposures and Cancer Working Group promotes integration of early-life events and exposures into public health cancer research, control, prevention, and policy strategies to reduce the cancer burden in the United States and globally.

  20. Summary of the laser working group

    International Nuclear Information System (INIS)

    Bigio, I.J.; Kurnit, N.A.; Donaldson, W.R.; Srinivasan-Rao, T.

    1988-10-01

    The laser working group considered several options to deliver synchronized laser pulses of the required energy to the photocathode and laser triggered switches. These requirements actually decreased during the course of the workshop, and the values finally settled upon (<10 μJ in 100 fs at ∼250 nm for the photocathode and ∼20 mJ in 2 ps near either 250 nm or 1 μm for the switches) were considered to be well within the state of the art. Some development work may be required, however, to provide a system that has the desirable characteristics of stability, ease of use and low maintenance. The baseline concept, which is similar to a number of existing systems, utilizes doubled Nd:YAG-pumped dye oscillator/amplifiers to produce an upconverted picosecond pulse that can be amplified to tens of mJ in a KrF excimer laser. A fraction of the dye oscillator output is also compressed by means of a fiber-grating compressor and further amplified in a dye amplifier before being upconverted to produce the synchronized pulse for the photocathode. 9 refs., 1 fig

  1. The use, publication and future directions of immunocytochemistry in veterinary medicine: a consensus of the Oncology-Pathology Working Group.

    Science.gov (United States)

    Priest, H L; Hume, K R; Killick, D; Kozicki, A; Rizzo, V L; Seelig, D; Snyder, L A; Springer, N L; Wright, Z M; Robat, C

    2017-09-01

    One of the primary objectives of the Oncology Pathology Working Group (OPWG), a joint initiative of the Veterinary Cancer Society and the American College of Veterinary Pathologists, is for oncologists and pathologists to collaboratively generate consensus documents to standardize aspects of and provide guidelines for oncologic pathology. Consensus is established through review of relevant peer-reviewed literature relative to a subgroup's particular focus. In this document, the authors provide descriptions of the literature reviewed, the review process, and a summary of the information gathered on immunocytochemistry. The intent of this publication is to help educate practitioners and pathologists on the process of immunocytochemistry and to provide a guide for the use of this technique in veterinary medicine. This document represents the opinions of the working group and the authors and does not constitute a formal endorsement by the American College of Veterinary Pathologists or the Veterinary Cancer Society. © 2016 John Wiley & Sons Ltd.

  2. Quebec industry and climatic changes : Quebec Industry Working Group on Climatic Changes

    International Nuclear Information System (INIS)

    2001-03-01

    Global climatic change is a phenomenon greatly influenced by greenhouse gas emissions resulting from human activity and the natural greenhouse effect necessary to sustain life on the planet. Carbon dioxide emissions in the atmosphere now exceed the levels prior to the industrial revolution by 31 per cent. Half of this increase occurred during the past 30 years, while the average temperature increased by 0.3 to 0.6 degrees C. By using climate change models, scientists have linked this increase to the increase in the concentration of carbon dioxide in the atmosphere and predict that the average temperature will rise by 1 to 3.5 degrees C during the next century with increases of 5 to 10 degrees C being felt in certain parts of Canada. In an effort to curb the emissions of carbon dioxide, the Quebec Industry Working Group on Climatic Change was created to represent different sectors of the industry, including energy, metallurgy, aluminium, cement, environment, mines, plastics, petrochemicals, pulp and paper, and manufacturing. The group worked at meeting the following objectives: (1) to examine the possibilities of reducing greenhouse gases emissions in the industrial sector, (2) to propose and evaluate measures and initiatives for the reduction of greenhouse gases emissions including their cost, impact and potential timetable for implementation, (3) to identify new and promising technologies in the field of greenhouse gases reduction, (4) to identify business opportunities and risks for industry in Quebec, and (5) to recommend an implementation strategy for the Kyoto Protocol for each sector, in terms of reduction measures that would be economical and in agreement with the various plans in place at the federal, provincial and municipal levels. A total of 22 recommendations were proposed covering the entire spectrum of the mandate. 15 tabs, 2 appendices

  3. Summary report for the Microwave Source Working Group

    International Nuclear Information System (INIS)

    Westenskow, G.A.

    1997-01-01

    This report summarizes the discussions of the Microwave Source Working Group during the Advanced Accelerator Concepts Workshop held October 13-19, 1996 in the Granlibakken Conference Center at Lake Tahoe, California. Progress on rf sources being developed for linear colliders is reviewed. Possible choices for high-power rf sources at 34 GHz and 94 GHz for future colliders are examined. 27 refs

  4. Summary report for the Microwave Source Working Group

    Energy Technology Data Exchange (ETDEWEB)

    Westenskow, G.A.

    1997-01-01

    This report summarizes the discussions of the Microwave Source Working Group during the Advanced Accelerator Concepts Workshop held October 13-19, 1996 in the Granlibakken Conference Center at Lake Tahoe, California. Progress on rf sources being developed for linear colliders is reviewed. Possible choices for high-power rf sources at 34 GHz and 94 GHz for future colliders are examined. 27 refs.

  5. SCC of cold-worked austenitic stainless steels exposed to PWR primary water conditions: susceptibility to initiation

    International Nuclear Information System (INIS)

    Herms, E.; Raquet, O.; Sejourne, L.; Vaillant, F.

    2009-01-01

    Heavily cold-worked austenitic stainless steels (AISI 304L and 316L types) could be significantly susceptible to Stress Corrosion Cracking (SCC) when exposed to PWR nominal primary water conditions even in absence of any pollutants. Susceptibility to SCC was shown to be related with some conditions such as initial hardness, procedure of cold-work or dynamic straining. A dedicated program devoted to better understand the initiation stage on CW austenitic stainless steels in PWR water is presented. Initiation is studied thanks to SCC test conditions leading to an intergranular cracking propagation mode on a CW austenitic stainless steel which is the mode generally reported after field experience. SCC tests are carried out in typical primary water conditions (composition 1000 ppm B and 2 ppm Li) and for temperature in the range 290 - 340 C. Material selected is 316L cold-worked essentially by rolling (reduction in thickness of 40%). Initiation tests are carried out under various stress levels with the aim to investigate the evolution of the initiation period versus the value of applied stress. SCC tests are performed on cylindrical notched specimens in order to increase the applied stress and allow accelerated testing without modify the exposure conditions to strictly nominal hydrogenated PWR water. Respective influences of cyclic/dynamic conditions on SCC initiation are presented and discussed. Dedicated interrupted tests help to investigate the behaviour of the crack initiation process. These SCC tests have shown that crack initiation could be obtained after a very short time under dynamic loading conditions on heavily pre-strained austenitic stainless steels. Actual results show that the most limiting stage of the cracking process on CW 316L seems to be the transition from slow transgranular propagation of surface initiated cracks to intergranular fast propagation through the thickness of the sample. The duration of this stage during crack initiation tests is

  6. Group intervention: A way to improve working teams' positive psychological capital.

    Science.gov (United States)

    Harty, Bo; Gustafsson, John-Anders; Björkdahl, Ann; Möller, Anders

    2015-01-01

    Positive psychological capital is reported to have positive effects on people's well-being and attitudes to their working lives. The objective of this study was to investigate if it is possible to increase the level of positive psychological capital by two group intervention programs. The research design was a controlled study with 2 × 2 experimental groups and two control groups. Two of the experimental groups received intervention I (IG I), the other two experimental groups received intervention II (IG II). Assessments were made before and after the intervention programs, with a follow-up at six months post-intervention. Instruments measuring the fundamentals of psychological capital: self-efficacy, hope, optimism, as well as health and job satisfaction were used. The results show that it is possible to increase the level of positive emotions, self-efficacy and job satisfaction of members of a working team by using group intervention methods. The positive changes observed at the end of the program remained six months after the intervention, with the exception of job satisfaction in IG II. It seems that the intervention had a greater influence on those persons who at the start of the study reported a low level of self-enhancement. The results were more pronounced in intervention group I where reinforcement of the resources and positive aspects of the work place environment were provided. A 10-week group intervention program that focused on learned optimism proved to be successful in increasing levels of self-efficacy and job satisfaction. While improvement was maintained six months post-intervention the small sample size and the attrition rate are limitations. Results are promising and further research is warranted.

  7. The Association between Quality Improvement Initiatives in Dementia Care and Supportive Psychosocial Work Environments in Nursing Homes.

    Science.gov (United States)

    Nakanishi, Miharu; Tei-Tominaga, Maki

    2018-05-08

    Background : Quality improvement initiatives can help nursing homes strengthen psychosocial work environments. The aim of the present study was to examine the association between supportive psychosocial work environment, and professional and organizational characteristics regarding quality improvement initiatives in dementia care. Methods : A paper questionnaire survey was administered to a convenience sample of 365 professional caregivers in 12 special nursing homes in Japan. Psychosocial work environment was assessed using the Social Capital and Ethical Climate at the Workplace Scale to calculate a score of social capital in the workplace, ethical leadership, and exclusive workplace climate. Variables for quality improvement initiatives included type of home (unit-type or traditional), presence of additional benefit for dementia care, and professionalism in dementia care among caregivers evaluated using the Japanese version of the Sense of Competence in Dementia Care Staff Scale. Results : Elevated professionalism and unit-type home were significantly associated with high social capital, strong ethical leadership, and low exclusive workplace climate. The presence of dementia care benefit was not associated with any subscale of psychosocial work environment. Conclusions : Quality improvement initiatives to foster supportive psychosocial work environment should enhance professionalism in dementia care with unit-based team building of professional caregivers in special nursing homes.

  8. The Association between Quality Improvement Initiatives in Dementia Care and Supportive Psychosocial Work Environments in Nursing Homes

    Directory of Open Access Journals (Sweden)

    Miharu Nakanishi

    2018-05-01

    Full Text Available Background: Quality improvement initiatives can help nursing homes strengthen psychosocial work environments. The aim of the present study was to examine the association between supportive psychosocial work environment, and professional and organizational characteristics regarding quality improvement initiatives in dementia care. Methods: A paper questionnaire survey was administered to a convenience sample of 365 professional caregivers in 12 special nursing homes in Japan. Psychosocial work environment was assessed using the Social Capital and Ethical Climate at the Workplace Scale to calculate a score of social capital in the workplace, ethical leadership, and exclusive workplace climate. Variables for quality improvement initiatives included type of home (unit-type or traditional, presence of additional benefit for dementia care, and professionalism in dementia care among caregivers evaluated using the Japanese version of the Sense of Competence in Dementia Care Staff Scale. Results: Elevated professionalism and unit-type home were significantly associated with high social capital, strong ethical leadership, and low exclusive workplace climate. The presence of dementia care benefit was not associated with any subscale of psychosocial work environment. Conclusions: Quality improvement initiatives to foster supportive psychosocial work environment should enhance professionalism in dementia care with unit-based team building of professional caregivers in special nursing homes.

  9. Work-group characteristics and performance in collectivistic and individualistic cultures.

    Science.gov (United States)

    Sosik, John J; Jung, Dong I

    2002-02-01

    The authors conducted a cross-cultural longitudinal investigation of the effects of culture (individualism-collectivism dichotomy) on group characteristics (functional heterogeneity, preference for teamwork, group potency, outcome expectation) and on performance of 83 work groups performing 2 decision-making tasks over a 15-week period. The individualists (U.S. students) reported higher levels of functional heterogeneity and group potency and attained higher levels of group performance than did the collectivists (Korean students). In addition, culture and time interacted to influence ratings of group potency and outcome expectation. The difference in ratings of group potency between individualists and collectivists increased over time. Outcome expectation was greater among the collectivists in Time 1 and among the individualists in Time 2. The authors discuss implications for future cross-cultural group research and international management.

  10. WORKING FROM HOME AS ALTERNATIVE FOR ACHEVING WORKE-LIFE BALANCE

    OpenAIRE

    Nevena Krasulja, Milica Vasiljeviæ Blagojeviæ, Ivana Radojeviæ

    2015-01-01

    TIn this paper, the authors are addressing the issue of family – work balance, as well as the connection between this phenomenon and working from home. The basic, initial point is that the desired balance can be achieved if the employees are provided with more flexible work schemes, one of which is having the option to perform their work from home. According to the forecasts regarding the work place of the future, employees from almost all demographic, cultural and social groups decided that ...

  11. The QCD/SM Working Group: Summary Report

    International Nuclear Information System (INIS)

    Dobbs, M.

    2004-01-01

    Among the many physics processes at TeV hadron colliders, we look most eagerly for those that display signs of the Higgs boson or of new physics. We do so however amid an abundance of processes that proceed via Standard Model (SM) and in particular Quantum Chromodynamics (QCD) interactions, and that are interesting in their own right. Good knowledge of these processes is required to help us distinguish the new from the known. Their theoretical and experimental study teaches us at the same time more about QCD/SM dynamics, and thereby enables us to further improve such distinctions. This is important because it is becoming increasingly clear that the success of finding and exploring Higgs boson physics or other New Physics at the Tevatron and LHC will depend significantly on precise understanding of QCD/SM effects for many observables. To improve predictions and deepen the study of QCD/SM signals and backgrounds was therefore the ambition for our QCD/SM working group at this Les Houches workshop. Members of the working group made significant progress towards this on a number of fronts. A variety of tools were further developed, from methods to perform higher order perturbative calculations or various types of resummation, to improvements in the modeling of underlying events and parton showers. Furthermore, various precise studies of important specific processes were conducted. A significant part of the activities in Les Houches revolved around Monte Carlo simulation of collision events. A number of contributions in this report reflect the progress made in this area. At present a large number of Monte Carlo programs exist, each written with a different purpose and employing different techniques. Discussions in Les Houches revealed the need for an accessible primer on Monte Carlo programs, featuring a listing of various codes, each with a short description, but also providing a low-level explanation of the underlying methods. This primer has now been compiled and a

  12. Using collaborative work groups to reduce O ampersand M costs

    International Nuclear Information System (INIS)

    Francoeur, R.; Jones, J.N.

    1995-01-01

    Commonwealth Edison Company (ComEd) entered the nineties burdened with external distractions from its core business of power generation. Its unresolved 1987 rate case continued to face intervention in the courts. Some of its largest industrial and municipal customers were exploring more economical alternatives. The new convention facility in Chicago actually engaged an independent energy supplier. Retail wheeling was the hot topic, and internal problems were present. Operations and Maintenance (O ampersand M) costs were steadily increasing. Two of their six nuclear stations were on the Nuclear Regulatory Commission's Watch List. Immediate changes had to occur if ComEd was to ensure its future competitiveness. At ComEd Braidwood Nuclear Power Station some untraditional work methodologies were embarked upon to help the parent company reduce its O ampersand M costs. Various types of collaborative work groups were formed, and have succeeded in lowering O ampersand M costs through shorter refueling outages and the use of fewer contracted personnel. These collaborative work groups are listed below and are described in detail in the remainder of this paper: (1) A core group of Maintenance Modification Contractor (MMC) supervision integrated into the Owner's Maintenance Staff, (2) A Corporate Outage Support Group of supervisory personnel which supplements the site's Maintenance Staff, (3) The Integrated Outage and Turbine Overhaul Contractor using a mixture of its own and Maintenance Staff supervisory personnel during outages with the Owner supplementing craft support using a third-party, (4) Six nuclear stations sharing key MMC personnel to insure experienced individuals are used effectively, and (5) Composite teams of maintenance personnel working across defined disciplines Braidwood Station has capitalized on the strategy of positive collaboration to become one of the lowest cost producers of nuclear power. Its use has enabled the Station to successfully complete the

  13. Working group 'Reglementat'hy'on'; Groupe de travail reglementat'hy'on

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    HyPac is a french platform on the hydrogen and fuel cells applications, created in 2008. This working group deals with the french regulation concerning the hydrogen fuels. It presents the problems of the existing regulation, the objectives and the actions planing of the group. (A.L.B.)

  14. Canadian space agency discipline working group for space dosimetry and radiation science

    International Nuclear Information System (INIS)

    Waker, Anthony; Waller, Edward; Lewis, Brent; Bennett, Leslie; Conroy, Thomas

    2008-01-01

    Full text: One of the great technical challenges in the human and robotic exploration of space is the deleterious effect of radiation on humans and physical systems. The magnitude of this challenge is broadly understood in terms of the sources of radiation, however, a great deal remains to be done in the development of instrumentation, suitable for the space environment, which can provide real-time monitoring of the complex radiation fields encountered in space and a quantitative measure of potential biological risk. In order to meet these research requirements collaboration is needed between experimental nuclear instrumentation scientists, theoretical scientists working on numerical modeling techniques and radiation biologists. Under the auspices of the Canadian Space Agency such a collaborative body has been established as one of a number of Discipline Working Groups. Members of the Space Dosimetry and Radiation Science working group form a collaborative network across Canada including universities, government laboratories and the industrial sector. Three central activities form the core of the Space Dosimetry and Radiation Science DWG. An instrument sub-group is engaged in the development of instruments capable of gamma ray, energetic charged particle and neutron dosimetry including the ability to provide dosimetric information in real-time. A second sub-group is focused on computer modeling of space radiation fields in order to assess the performance of conceptual designs of detectors and dosimeters or the impact of radiation on cellular and sub-cellular biological targets and a third sub-group is engaged in the study of the biological effects of space radiation and the potential of biomarkers as a method of assessing radiation impact on humans. Many working group members are active in more than one sub-group facilitating communication throughout the whole network. A summary progress-report will be given of the activities of the Discipline Working Group and the

  15. Work Social Supports, Role Stressors, and Work-Family Conflict: The Moderating Effect of Age

    Science.gov (United States)

    Matthews, Russell A.; Bulger, Carrie A.; Barnes-Farrell, Janet L.

    2010-01-01

    The current study examined whether important distinctions are masked if participant age is ignored when modeling relationships among constructs associated with the work-family interface. An initial omnibus model of social support, work role stressors, and work-family conflict was tested. Multiple groups analyses were then conducted to investigate…

  16. Perceived discontinuities and continuities in transdisciplinary scientific working groups.

    Science.gov (United States)

    Crowston, Kevin; Specht, Alison; Hoover, Carol; Chudoba, Katherine M; Watson-Manheim, Mary Beth

    2015-11-15

    We examine the DataONE (Data Observation Network for Earth) project, a transdisciplinary organization tasked with creating a cyberinfrastructure platform to ensure preservation of and access to environmental science and biological science data. Its objective was a difficult one to achieve, requiring innovative solutions. The DataONE project used a working group structure to organize its members. We use organizational discontinuity theory as our lens to understand the factors associated with success in such projects. Based on quantitative and qualitative data collected from DataONE members, we offer recommendations for the use of working groups in transdisciplinary synthesis. Recommendations include welcome diverse opinions and world views, establish shared communication practices, schedule periodic synchronous face-to-face meetings, and ensure the active participation of bridge builders or knowledge brokers such as librarians who know how to ask questions about disciplines not their own. Copyright © 2015 Elsevier B.V. All rights reserved.

  17. Summary report: working group 2 on 'Plasma Based Acceleration Concepts'

    International Nuclear Information System (INIS)

    Esarey, E.; Leemans, W.P.

    1998-01-01

    A summary of the talks, papers and discussion sessions presented in the Working Group on Plasma Based Acceleration Concepts is given within the context of the progress towards a 1 GeV laser driven accelerator module. The topics covered within the Working Group were self-modulated laser wakefield acceleration, standard laser wakefield acceleration, plasma beat wave acceleration, laser guiding and wake excitation in plasma channels, plasma wakefield acceleration, plasma lenses and optical injection techniques for laser wakefield accelerators. An overview will be given of the present status of experimental and theoretical progress as well as an outlook towards the future physics and technological challenges for the development of an optimized accelerator module

  18. The Spanish human papillomavirus vaccine consensus group: a working model.

    Science.gov (United States)

    Cortés-Bordoy, Javier; Martinón-Torres, Federico

    2010-08-01

    Successful implementation of Human Papillomavirus (HPV) vaccine in each country can only be achieved from a complementary and synergistic perspective, integrating all the different points of view of the diverse related professionals. It is this context where the Spanish HPV Vaccine Consensus Group (Grupo Español de Consenso sobre la Vacuna VPH, GEC-VPH) was created. GEC-VPH philosophy, objectives and experience are reported in this article, with particular attention to the management of negative publicity and anti-vaccine groups. Initiatives as GEC-VPH--adapted to each country's particular idiosyncrasies--might help to overcome the existing barriers and to achieve wide and early implementation of HPV vaccination.

  19. 77 FR 17457 - Work Group on Alternative Test Methods for Commercial Measuring Devices

    Science.gov (United States)

    2012-03-26

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology Work Group on Alternative... Work Group (WG) to examine alternative methods for testing the accuracy of commercial measuring devices... participates to promote uniformity among the states in laws, regulations, methods, and testing equipment that...

  20. A Preliminary Study of Work-Focused Cognitive Behavioural Group Therapy for Japanese Workers.

    Science.gov (United States)

    Ito, Daisuke; Watanabe, Asuka; Takeichi, Sakino; Ishihara, Ayako; Yamamoto, Kazuyoshi

    2018-06-06

    In Japan, cognitive behavioural therapy (CBT) has been introduced in the 'Rework Programme', but its impact on return to work (RTW) has not been fully clarified. This pilot study investigated the initial efficacy of a work-focused cognitive behavioural group therapy (WF-CBGT) for Japanese workers on sick leave due to depression. Twenty-three patients on leave due to depression were recruited from a mental health clinic. WF-CBGT including behavioural activation therapy, cognitive therapy, and problem-solving therapy techniques was conducted for eight weekly 150-minute sessions. Participants completed questionnaires on depression and anxiety (Kessler-6), social adaptation (Social Adaptation Self-Evaluation Scale), and difficulty in RTW (Difficulty in Returning to Work Inventory) at pre- and post-intervention time points. Rates of re-instatement after the intervention were examined. One participant dropped out, but 22 participants successfully completed the intervention. All scale scores significantly improved after intervention and, except for difficulty in RTW related to physical fitness, all effect sizes were above the moderate classification. All participants who completed the intervention succeeded in RTW. Results suggested the possibility that WF-CBGT may be a feasible and promising intervention for Japanese workers on leave due to depression regardless of cross-cultural differences, but that additional research examining effectiveness using controlled designs and other samples is needed. Future research should examine the efficacy of this programme more systematically to provide relevant data to aid in the continued development of an evidence-based intervention.

  1. [Goal analysis and goal operationalisation: a group intervention for the enhancement of work motivation].

    Science.gov (United States)

    Hanna, Rana; Fiedler, Rolf G; Dietrich, Hilke; Greitemann, Bernhard; Heuft, Gereon

    2010-08-01

    Work motivation, mental well-being and competencies of self-regulation are linked to successful job-related reintegration after rehabilitation. Based on the Diagnostical Instrument to assess Work motivation (Diagnostikinstrument für Arbeitsmotivation DIAMO) and existing training programs, a new group intervention, the goal analysis and goal operationalization, was developed and evaluated. The objective of this intervention, designed for participants of a rehabilitation program was to enhance work motivation and volitional control processes (self-regulation and self-control), to encourage job-related goal orientation and to thereby increase the probability of goal achievement. In a quasi-experimental longitudinal design 207 patients (111 experimental group/96 control group) were tested. The experimental group took part in the job-related training (ZAZO) in addition to the usual rehabilitation. The evaluation was conducted through various scales at t0 (beginning) and t1 (end of the training). Scales for the measurement of work motivation, mental well-being, status of rehabilitation, competencies of self-regulation and the subjective prognosis of the ability to work were used. As direct effects of the training an enhancement of work motivation and of an improved subjective prognosis of the ability to work were expected. Accordingly, a positive influence on the subjective well-being as indirect effects, were anticipated in the long run, the experimental group should also show an enhanced job-related reintegration. Participants of the experimental group showed significantly higher values on particular scales of the Diagnostical Instrument of Work motivation as opposed to the control group (curiosity motive, attitudes to work and contact motive). Most notably, significant interactional effects could be found on the scale for the subjective prognosis of the ability to work, which is a highly reliable instrument and important predictor for prospective job

  2. Oklo working group meeting

    International Nuclear Information System (INIS)

    Von Maravic, H.

    1993-01-01

    Natural analogue studies have been carried out for several years in the framework of the European Community's R and D programme on radioactive waste; and within its recent fourth five-year programme on 'Management and storage of radioactive waste (1990-94)' the Community is participating in the Oklo study, natural analogue for transfer processes in a geological repository. The Oklo project is coordinated by CEA-IPSN (F) and involves laboratories from several CEA directorates (IPSN, DTA and DCC) which collaborate with other institutions from France: CREGU, Nancy; CNRS, Strasbourg and ENSMD, Fontainebleau. Moreover, institutes from non-EC member States are also taking part in the Oklo study. The second joint CEC-CEA progress meeting of the Oklo Working Group was held in April 1992 in Brussels and gave the possibility of reviewing and discussing progress made since its first meeting in February 1991 at CEA in Fontenay-aux-Roses. About 40 participants from 15 laboratories and organizations coming from France, Canada, Gabon, Japan, Sweden and the USA underline the great interest in the ongoing research activities. The meeting focused on the different tasks within the CEC-CEA Oklo project concerning (i) field survey and sampling, (ii) characterization of the source term, (iii) studies of the petrographical and geochemical system, and (iv) studies of the hydrogeological system and hydrodynamic modelling. (author) 17 papers are presented

  3. BUGS at work : a bicycle user group guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This guide provides practical advice to cyclists on how start a Bicycle User Group (BUG) at their workplace. It offers tools to encourage employers to be proactive in improving facilities in support of cycle commuting. Several BUGs across Canada have worked towards getting better bicycle parking, lockers and shower facilities at their workplace. Other incentives include policies such as flexible work hours for cyclist commuters; casual dress on Friday; reimbursement for the subsidized cost of free parking provided by employers; and, use of a company car if needed for company business during the work day. The advantages to employers include: reduced health care costs because cyclists are physically fit; decreased absenteeism; increased productivity; reduced parking costs; lower company transportation bills; and, a greener corporate image. BUGs provide cycling information ranging from cycling maps to pamphlets and they raise cycle awareness. This guide includes cycling survey samples and examples of successful BUG activities across Canada. refs., tabs., figs.

  4. Initial experience gained with the balance-group system of the Swiss power supply legislation

    International Nuclear Information System (INIS)

    Waldner, M.; Rechsteiner, S.

    2010-01-01

    This article takes a look at the initial experience gained with the Swiss balance-group system. This system was introduced within the framework of Swiss power supply legislation (StromVG - Stromversorgungsgesetz). The balance-group system was considered to be an essential precondition for the implementation of an energy trading business in a liberalised power market. The associated rights and responsibilities and the economic risks involved are discussed in detail. The partners and structures involved in such a balance-group are looked at and basic models for the associated contracts are examined. The relationship between balance-groups and the national power grid Swissgrid are discussed

  5. Individual and group-level job resources and their relationships with individual work engagement

    OpenAIRE

    F?llemann, D?sir?e; Brauchli, Rebecca; Jenny, Gregor J.; Bauer, Georg F.

    2016-01-01

    Objectives: This study adds a multilevel perspective to the well-researched individual-level relationship between job resources and work engagement. In addition, we explored whether individual job resources cluster within work groups because of a shared psychosocial environment and investigated whether a resource-rich psychosocial work group environment is beneficial for employee engagement over and above the beneficial effect of individual job resources and independent of their variability w...

  6. Mixed Waste Focus Area Mercury Working Group: An integrated approach to mercury waste treatment and disposal

    International Nuclear Information System (INIS)

    Conley, T.B.; Morris, M.I.; Osborne-Lee, I.W.

    1998-03-01

    In May 1996, the US Department of Energy (DOE) Mixed Waste Focus Area (MWFA) initiated the Mercury Working Group (HgWG). The HgWG was established to address and resolve the issues associated with mercury contaminated mixed wastes. During the MWFA's initial technical baseline development process, three of the top four technology deficiencies identified were related to the need for amalgamation, stabilization, and separation removal technologies for the treatment of mercury and mercury contaminated mixed waste. The HgWG is assisting the MWFA in soliciting, identifying, initiating, and managing efforts to address these areas. The focus of the HgWG is to better establish the mercury related treatment technologies at the DOE sites, refine the MWFA technical baseline as it relates to mercury treatment, and make recommendations to the MWFA on how to most effectively address these needs. Based on the scope and magnitude of the mercury mixed waste problem, as defined by HgWG, solicitations and contract awards have been made to the private sector to demonstrate both the amalgamation and stabilization processes using actual mixed wastes. Development efforts are currently being funded that will address DOE's needs for separation removal processes. This paper discusses the technology selection process, development activities, and the accomplishments of the HgWG to date through these various activities

  7. 75 FR 66125 - Federal Land Managers' Air Quality Related Values Work Group (FLAG)

    Science.gov (United States)

    2010-10-27

    ... pollutants that could affect the health and status of resources in areas managed by the three agencies... Work Group (FLAG) AGENCY: National Park Service, Interior. ACTION: Notice of availability of final... Public Comments document. The Federal Land Managers' Air Quality Related Values Work Group (FLAG) was...

  8. Use of Adult Patient Focus Groups to Develop the Initial Item Bank for a Cochlear Implant Quality-of-Life Instrument.

    Science.gov (United States)

    McRackan, Theodore R; Velozo, Craig A; Holcomb, Meredith A; Camposeo, Elizabeth L; Hatch, Jonathan L; Meyer, Ted A; Lambert, Paul R; Melvin, Cathy L; Dubno, Judy R

    2017-10-01

    No instrument exists to assess quality of life (QOL) in adult cochlear implant (CI) users that has been developed and validated using accepted scientific standards. To develop a CI-specific QOL instrument for adults in accordance with the Patient Reported Outcomes Measurement Information System (PROMIS) guidelines. As required in the PROMIS guidelines, patient focus groups participated in creation of the initial item bank. Twenty-three adult CI users were divided into 1 of 3 focus groups stratified by word recognition ability. Three moderator-led focus groups were conducted based on grounded theory on December 3, 2016. Two reviewers independently analyzed focus group recordings and transcripts, with a third reviewer available to resolve discrepancies. All data were reviewed and reported according to the Consolidated Criteria for Reporting Qualitative Research. The setting was a tertiary referral center. Coded focus group data. The 23 focus group participants (10 [43%] female; mean [range] age, 68.1 [46.2-84.2] years) represented a wide range of income levels, education levels, listening modalities, CI device manufacturers, duration of CI use, and age at implantation. Data saturation was determined to be reached before the conclusion of each of the focus groups. After analysis of the transcripts, the central themes identified were communication, emotion, environmental sounds, independence and work function, listening effort, social isolation and ability to socialize, and sound clarity. Cognitive interviews were carried out on 20 adult CI patients who did not participate in the focus groups to ensure item clarity. Based on these results, the initial QOL item bank and prototype were developed. Patient focus groups drawn from the target population are the preferred method of identifying content areas and domains for developing the item bank for a CI-specific QOL instrument. Compared with previously used methods, the use of patient-centered item development for a CI

  9. Working group on VVER safety analysis - report of the 2010 meeting

    International Nuclear Information System (INIS)

    Kliem, S.

    2010-01-01

    The AER Working Group D on WWER reactor safety analysis held its nineteenth meeting in Pisa, Italy, during the period 15-16 April, 2010. The meeting was hosted by the San Piero a Grado Nuclear Research Group of the University of Pisa and was held in conjunction with the second workshop on the OECD/NEA Benchmark for the Kalinin-3 WWER-1000 NPP and the fourth workshop on the OECD Benchmark for Uncertainty Analysis in Best-Estimate Modelling (UAM) for Design, Operation and Safety Analysis of LWRs. Altogether 12 participants attended the meeting of the working group D, 8 from AER member organizations and 4 guests from non-member organization. The co-ordinator of the working group, Mr. S. Kliem, served as chairman of the meeting. The meeting started with a general information exchange about the recent activities in the participating organizations. The given presentations and the discussions can be attributed to the following topics:-Code validation and benchmarking including the calculation of the OECD/NEA Benchmark for the Kalinin-3 WWER-1000 NPP;-Safety analyses and code developments;-Future activities A list of the participants and a list of the handouts distributed at the meeting are attached to the report. The corresponding PDF-files can be obtained from the chairman. (Author)

  10. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  11. R and D activities of the ESARDA NDA working group

    International Nuclear Information System (INIS)

    Guardini, S.; Bignan, G.

    1999-01-01

    The aim of this paper is to report the R and D activities of the ESARDA Working Group on Techniques and Standards for Non-Destructive Analysis (NDA), as well as to discuss the role and possibilities of the group in the modern R and D scenario in safeguards and non-proliferation. The main tasks of the ESARDA NDA Working have been identified as being to: Define needs for procedural standards and reference materials; Design and manage the production and characterisation of reference materials; Assess and contribute to improving the performances of NDA techniques; Set up and maintain a list of NDA instruments and methods currently used for Safeguards purposes; and, through the above activities, assist Operators and Safeguards Authorities in their duty of Safeguards implementation. Members and observers appointed to the working group represent plant operators, the nuclear industry, R and D laboratories, NDA instrument developers and both safeguards control authorities. The participation of major European plant operators and of the EURATOM Safeguards Directorate and IAEA has always been assured and contributes to the good outcome of the WG activities. The ongoing R and D activities of the NDA Working Group are: Monte Carlo performance intercomparisons; 242 Pu accuracy assessment and improvement; NDA Sampling errors; General NDA performance evaluations. Some milestones have recently been reached: The 242 Pu uncertainty improvement project is coming to an end with the issuing of a new isotopic correlation; The NCC 'reals' evaluation and the Monte Carlo round robin is producing its first results; The Uranium Enrichment Round Robin Exercise has been completed; The waste drum standards are being characterised and constructed: they will be available by spring 1998. The round robin amongst laboratories will then start: summer 1998. Future activities comprise, beside the above issues, technical problems linked with the new challenges posed by new regimes of safeguards and non

  12. Introducing the AAS Working Group on Astroinformatics and Astrostatistics

    Science.gov (United States)

    Ivezic, Zeljko

    2014-01-01

    In response to two White Papers submitted to the Astro2010 Decadal Survey (1,2), a new AAS Working Group on Astroinformatics and Astrostatistics (WGAA) has been approved by the AAS Council at the 220th Meeting, June 2012, in Anchorage. The motivation for this WG is the growing importance of the interface between astronomy and various branches of applied mathematics, computer science and the emerging field of data science. With the new data-intensive projects envisioned for the coming decade, the need for advice derived from the focused attention of a group of AAS members who work in these areas is bound to increase. The Working Group is charged with spreading awareness of rapidly advancing computational techniques, sophsticated statistical methods, and highly capble software to further the goals of astronomical and astrophysical research. The three main strategic goals adopted by the WGAA Steering Committee for the next few years are to: (i) develop, organize and maintain methodological resources (such as software tools, papers, books, and lectures); (ii) enhance human resources (such as foster the creation of career paths, establish a Speakers' Bureau, establish and maintain an archived discussion forum, enable periodic news distribution); and (iii) organize topical meetings. The WGAA Steering Committee at this time includes twelve members: Kirk Borne, George Djorgovski, Eric Feigelson, Eric Ford, Alyssa Goodman, Joe Hilbe, Zeljko Ivezic (chair), Ashish Mahabal, Aneta Siemiginowska, Alex Szalay, Rick White, and Padma Yanamandra-Fisher. I will summarize our accomplishments since July 2012. (1) Astroinformatics: A 21st Century Approach to Astronomy (Borne & 90 coauthors), (2) The Astronomical Information Sciences: A Keystone for 21st-Century Astronomy (Loredo & 72 coauthors)

  13. Working group report on hadrons in the nuclear medium

    Energy Technology Data Exchange (ETDEWEB)

    Ent, R. [CEBAF, Newport News, VA (United States); Milner, R.G. [Masachusetts Inst. of Technology, Cambridge, MA (United States)

    1994-04-01

    This working group focussed on the subject of hadrons in the nuclear medium. It encompassed both the understanding of the nucleus itself in terms of its binding and its structure, and the use of the nucleus as a medium to probe QCD and the structure of hadrons. Both aspects were addressed during the workshop, though the emphasis tended towards the latter. Almost inescapably this working group had some overlap with the other working groups, as the nucleus can also be used as a medium to probe the production and structure of vector mesons. Also, inclusive and semi-inclusive processes can be used as a probe of nuclear effects, for instance in the case of deep-inelastic scattering for x > 1. In this summary report the authors will try to restrict themselves to only those issues where the nuclear medium is important. To increase their understanding of the nucleus in terms of its binding and structure, they would like to know the effect of a dense nuclear medium on a nucleon, to know the non-nucleonic degrees of freedom needed to describe a nuclear system, and to understand the implications of the fact that a bound nucleon is necessarily off its mass-shell. The results of many lepton scattering experiments during the last two decades have raised these questions, but at this moment there are no definitive answers. The hope is that the well-known electron probe, with sufficient energy to probe the short-range properties of nuclei, can provide insight. Especially, the authors would like a conclusive answer to the question if, and to what extent, quark degrees of freedom are necessary to describe a nuclear system.

  14. Working group report on hadrons in the nuclear medium

    International Nuclear Information System (INIS)

    Ent, R.; Milner, R.G.

    1994-01-01

    This working group focussed on the subject of hadrons in the nuclear medium. It encompassed both the understanding of the nucleus itself in terms of its binding and its structure, and the use of the nucleus as a medium to probe QCD and the structure of hadrons. Both aspects were addressed during the workshop, though the emphasis tended towards the latter. Almost inescapably this working group had some overlap with the other working groups, as the nucleus can also be used as a medium to probe the production and structure of vector mesons. Also, inclusive and semi-inclusive processes can be used as a probe of nuclear effects, for instance in the case of deep-inelastic scattering for x > 1. In this summary report the authors will try to restrict themselves to only those issues where the nuclear medium is important. To increase their understanding of the nucleus in terms of its binding and structure, they would like to know the effect of a dense nuclear medium on a nucleon, to know the non-nucleonic degrees of freedom needed to describe a nuclear system, and to understand the implications of the fact that a bound nucleon is necessarily off its mass-shell. The results of many lepton scattering experiments during the last two decades have raised these questions, but at this moment there are no definitive answers. The hope is that the well-known electron probe, with sufficient energy to probe the short-range properties of nuclei, can provide insight. Especially, the authors would like a conclusive answer to the question if, and to what extent, quark degrees of freedom are necessary to describe a nuclear system

  15. Plutonium working group report on environmental, safety and health vulnerabilities associated with the Department's plutonium storage. Volume II, part 7: Mound working group assessment team report

    International Nuclear Information System (INIS)

    1994-09-01

    This is the report of a visit to the Mound site by the Working Group Assessment Team (WGAT) to assess plutonium vulnerabilities. Purposes of the visit were: to review results of the site's self assessment of current practices for handling and storing plutonium; to conduct an independent assessment of these practices; to reconcile differences and assemble a final list of vulnerabilities; to calculate consequences and probability for each vulnerability; and to issue a report to the Working Group. This report, representing completion of the Mound visit, will be compiled along with those from all other sites with plutonium inventories as part of a final report to the Secretary of Energy

  16. Interagency Advanced Power Group, Joint Electrical and Nuclear Working Group, meeting minutes, November 16--17, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Reports on soldier power R&D review, N-MCT power electronic building blocks, silicon carbide power semiconductor work, and ground based radar were made to the Power Conditioning Panel. An introduction to high temperature electronics needs, research and development was made to the High Temperature Electronics Subcommittee. The Pulse Power Panel received reports on the navy ETC gun, and army pulse power. The Superconductivity Panel received reports on high-tc superconducting wires, superconducting magnetic energy storage, and superconducting applications. The Nuclear Working Group received presentations on the Topaz nuclear power program, and space nuclear work in the Department of Energy.

  17. 75 FR 61747 - Discount Energy Group, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2010-10-06

    ... proceeding of Discount Energy Group, LLC's application for market-based rate authority, with an accompanying... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-2803-000] Discount Energy Group, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket...

  18. Student Attitudes towards Group Work among Undergraduates in Business Administration, Education and Mathematics

    Science.gov (United States)

    Gottschall, Holli; Garcia-Bayonas, Mariche

    2008-01-01

    Group work is a widely used teaching technique in higher education. Faculty find themselves utilizing this method in their classes more and more, yet few studies examine what students actually think about group work. The current study surveyed Mathematics, Education, and Business Administration majors at a mid-sized southeastern university in…

  19. Summary of the activities of the ISAM Confidence Building Working Group

    International Nuclear Information System (INIS)

    Dolinar, G.M.; Batandjieva, B.

    2002-01-01

    During the early stages of the ISAM project confidence building was a relatively new topic in the radioactive waste disposal literature, but it was beginning to receive some attention. Although almost all safety assessment activities are intended to provide a level of confidence in the results of the assessment, considering the activities from the viewpoint of how they contributed to the decision making of various 'audiences' was relatively new. The ISAM project included the Confidence Building Working Group (CBWG) to examine the topic of Confidence Building and this paper provides a summary of the working group findings. (author)

  20. Report of ITER Special Working Group 2

    International Nuclear Information System (INIS)

    Roberts, M.

    1994-01-01

    ITER Special Working Group 2 (SWG-2) was established by the terms of the ITER-EDA Agreement. According to that agreement, open-quotes SWG-2 shall submit guidelines for implementation of task assignments by the Home Teams to the Council for approval at its second meeting. This SWG shall also draft Protocol 2 to the ITER-EDA Agreement and submit a draft to the Council not later than by 21 May 1993.close quotes The members of SWG-2 for Protocol 2 drafting are listed. The rest of this paper is the verbatim report of SWG-2 on Protocol 2

  1. Stomacare nurses and their share in the work with self-help groups of patiens.

    OpenAIRE

    ŠŤASTNÁ, Olga

    2010-01-01

    Stoma nurses and their contribution to work with self-help groups of patients. The diploma thesis dealt with the cooperation of stoma nurses with self-help groups of stoma patients in ten regions of the Czech Republic. The aim was to find out if stoma nurses recognize the importance of self-help groups for stoma patients, how their work contributes to self-help groups, if stoma nurses cooperate with self-help groups and if they inform stoma patients about the existence of self-help groups. An...

  2. Globalisation in the Lecture Room? Gender and Cultural Diversity in Work Groups

    Science.gov (United States)

    Umans, Timurs

    2011-01-01

    This paper empirically investigates the relationship between cultural and gender diversity and performance in groups of business students working on complex assignments. The study finds that gender diversity in student groups has a positive influence on group outcomes, while cultural diversity, irrespective of its conceptualisation, leads to…

  3. REPORT OF THE SNOWMASS M6 WORKING GROUP ON HIGH INTENSITY PROTON SOURCES.

    Energy Technology Data Exchange (ETDEWEB)

    CHOU,W.; WEI,J.

    2001-08-14

    The M6 working group had more than 40 active participants (listed in Section 4). During the three weeks at Snowmass, there were about 50 presentations, covering a wide range of topics associated with high intensity proton sources. The talks are listed in Section 5. This group also had joint sessions with a number of other working groups, including E1 (Neutrino Factories and Muon Colliders), E5 (Fixed-Target Experiments), M1 (Muon Based Systems), T4 (Particle Sources), T5 (Beam dynamics), T7 (High Performance Computing) and T9 (Diagnostics). The M6 group performed a survey of the beam parameters of existing and proposed high intensity proton sources, in particular, of the proton drivers. The results are listed in Table 1. These parameters are compared with the requirements of high-energy physics users of secondary beams in Working Groups E1 and E5. According to the consensus reached in the E1 and E5 groups, the U.S. HEP program requires an intense proton source, a 1-4 MW Proton Driver, by the end of this decade.

  4. REPORT OF THE SNOWMASS M6 WORKING GROUP ON HIGH INTENSITY PROTON SOURCES

    International Nuclear Information System (INIS)

    CHOU, W.; WEI, J.

    2001-01-01

    The M6 working group had more than 40 active participants (listed in Section 4). During the three weeks at Snowmass, there were about 50 presentations, covering a wide range of topics associated with high intensity proton sources. The talks are listed in Section 5. This group also had joint sessions with a number of other working groups, including E1 (Neutrino Factories and Muon Colliders), E5 (Fixed-Target Experiments), M1 (Muon Based Systems), T4 (Particle Sources), T5 (Beam dynamics), T7 (High Performance Computing) and T9 (Diagnostics). The M6 group performed a survey of the beam parameters of existing and proposed high intensity proton sources, in particular, of the proton drivers. The results are listed in Table 1. These parameters are compared with the requirements of high-energy physics users of secondary beams in Working Groups E1 and E5. According to the consensus reached in the E1 and E5 groups, the U.S. HEP program requires an intense proton source, a 1-4 MW Proton Driver, by the end of this decade

  5. Working with Group-Tasks and Group Cohesiveness

    Science.gov (United States)

    Anwar, Khoirul

    2016-01-01

    This study aimed at exploring the connection between the use of group task and group cohesiveness. This study is very important because the nature of the learner's success is largely determined by the values of cooperation, interaction, and understanding of the learning objectives together. Subjects of this study are 28 students on the course…

  6. Report of the Quark Flavor Physics Working Group

    CERN Document Server

    Butler, J N; Ritchie, J L; Cirigliano, V; Kettell, S; Briere, R; Petrov, A A; Schwartz, A; Skwarnicki, T; Zupan, J; Christ, N; Sharpe, S R; Van de Water, R S; Altmannshofer, W; Arkani-Hamed, N; Artuso, M; Asner, D M; Bernard, C; Bevan, A J; Blanke, M; Bonvicini, G; Browder, T E; Bryman, D A; Campana, P; Cenci, R; Cline, D; Comfort, J; Cronin-Hennessy, D; Datta, A; Dobbs, S; Duraisamy, M; El-Khadra, A X; Fast, J E; Forty, R; Flood, K T; Gershon, T; Grossman, Y; Hamilton, B; Hill, C T; Hill, R J; Hitlin, D G; Jaffe, D E; Jawahery, A; Jessop, C P; Kagan, A L; Kaplan, D M; Kohl, M; Krizan, P; Kronfeld, A S; Lee, K; Littenberg, L S; MacFarlane, D B; Mackenzie, P B; Meadows, B T; Olsen, J; Papucci, M; Parsa, Z; Paz, G; Perez, G; Piilonen, L E; Pitts, K; Purohit, M V; Quinn, B; Ratcliff, B N; Roberts, D A; Rosner, J L; Rubin, P; Seeman, J; Seth, K K; Schmidt, B; Schopper, A; Sokoloff, M D; Soni, A; Stenson, K; Stone, S; Sundrum, R; Tschirhart, R; Vainshtein, A; Wah, Y W; Wilkinson, G; Wise, M B; Worcester, E; Xu, J; Yamanaka, T

    2013-01-01

    This report represents the response of the Intensity Frontier Quark Flavor Physics Working Group to the Snowmass charge. We summarize the current status of quark flavor physics and identify many exciting future opportunities for studying the properties of strange, charm, and bottom quarks. The ability of these studies to reveal the effects of new physics at high mass scales make them an essential ingredient in a well-balanced experimental particle physics program.

  7. Food Parenting Measurement Issues: Working Group Consensus Report

    OpenAIRE

    Hughes, Sheryl O.; Frankel, Leslie A.; Beltran, Alicia; Hodges, Eric; Hoerr, Sharon; Lumeng, Julie; Tovar, Alison; Kremers, Stef

    2013-01-01

    Childhood obesity is a growing problem. As more researchers become involved in the study of parenting influences on childhood obesity, there appears to be a lack of agreement regarding the most important parenting constructs of interest, definitions of those constructs, and measurement of those constructs in a consistent manner across studies. This article aims to summarize findings from a working group that convened specifically to discuss measurement issues related to parental influences on...

  8. Final detailed report of the work group number 3

    International Nuclear Information System (INIS)

    1999-01-01

    The objective of this work group was to propose the tools the most adapted for the evaluation of radionuclides concentration of the north Cotentin in environment, on searching to validate the model of transfer of radionuclides released by industries by comparing them to the measures realised by the different stakeholders. (N.C.)

  9. Summary of the BDS and MDI CLIC08 Working Group

    CERN Document Server

    Tomás, R; Ahmed, I; Ambatu, PK; Angal-Kalinin, D; Barlow, R; Baud, J P; Bolzon, B; Braun, H; Burkhardt, H; Burt, GC; Corsini, R; Dalena, B; Dexter, AC; Dolgashev, V; Elsener, K; Fernandez Hernando, JL; Gaillard, G; Geffroy, N; Jackson, F; Jeremie, A; Jones, RM; McIntosh, P; Moffeit, K; Peltier, F; Resta-López, J; Rumolo, G; Schulte, D; Seryi, A; Toader, A; Zimmermann, F

    2008-01-01

    This note summarizes the presentations held within the Beam Delivery System and Machine Detector Interface working group of the CLIC08 workshop. The written contributions have been provided by the presenters on a voluntary basis.

  10. Effect of Group Work on EFL Students' Attitudes and Learning in Higher Education

    Science.gov (United States)

    Taqi, Hanan A.; Al-Nouh, Nowreyah A.

    2014-01-01

    The use of group work in classroom activities is a method used for motivating learning and increasing the idea of pleasure through learning. The current study investigates the advantages of group work in exams in the English department, in the College of Basic Education. 40 students in two classes of "The Introduction of Phonetics and…

  11. Summy of the working groupI of the care HHH LUMI-2005 workshop

    CERN Document Server

    Brüning, Oliver Sim

    2006-01-01

    The working group I of the LUMI-2005 workshop was asked to put together a catalogue of basic design options for the IR solutions for an LHC-upgrade. The goal of the working group was to discuss the different solutions with respect to the maximum beta-functions inside the first focusing quadrupole magnets and the resulting required quadrupole apertures the chromatic aberrations on the one hand and the implications for the magnet technology on the other hand. Such a comparison requires a wide range of input data ranging from the expected loss patterns at the magnetic elements and the resulting peak and average heat deposition to the obtainable peak magnetic field and quench limits for different magnet design options and the correct ability of the chromatic aberrations for a given optics design. Given the wide spectrum of relevant input data the working group could not yet prepare a final ranking of the various design options. Rather the working group succeeded in fixing some of the key boundary conditions in or...

  12. The Influence of tolerance on the Learning Processes in Project Group Work

    DEFF Research Database (Denmark)

    Wiberg, Merete

    This paper presents a moral perspective on group work in higher education by addressing tolerance as a moral value of practice which is intertwined with learning of disciplinary knowledge. The relevance of tolerance among students is discussed in relation to Dewey's ideas of learning through...... participation. A link between morality and learning via knowledge production is to be found in the concept of participation due to an understanding of education as constitutive for a democratic society.The aim is to sharpen and discuss the concept of tolerance with respect to both strength and limits...... of the concept. Project group work is an example of a social setting in an educational context where collaboration between students on the one hand is seen as a way to stimulate processes of learning  and on the other hand to strengthen social and moral competences. To be discussed in the paper is how group work...

  13. Report of the eRHIC Ring-Ring Working Group

    Energy Technology Data Exchange (ETDEWEB)

    Aschenauer, E. C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Berg, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Blaskiewicz, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Brennan, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Fedotov, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Fischer, W. [Brookhaven National Lab. (BNL), Upton, NY (United States); Litvinenko, V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Montag, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Palmer, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Parker, B. [Brookhaven National Lab. (BNL), Upton, NY (United States); Peggs, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ptitsyn, V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ranjbar, V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tepikian, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Trbojevic, D. [Brookhaven National Lab. (BNL), Upton, NY (United States); Willeke, F. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-10-13

    This report evaluates the ring-ring option for eRHIC as a lower risk alternative to the linac-ring option. The reduced risk goes along with a reduced initial luminosity performance. However, a luminosity upgrade path is kept open. This upgrade path consists of two branches, with the ultimate upgrade being either a ring-ring or a linac-ring scheme. The linac-ring upgrade could be almost identical to the proposed linac-ring scheme, which is based on an ERL in the RHIC tunnel. This linac-ring version has been studied in great detail over the past ten years, and its significant risks are known. On the other hand, no detailed work on an ultimate performance ring-ring scenario has been performed yet, other than the development of a consistent parameter set. Pursuing the ring-ring upgrade path introduces high risks and requires significant design work that is beyond the scope of this report.

  14. Assessment of space plasma effectsfor satellite applications:Working Group 2 overview

    Directory of Open Access Journals (Sweden)

    N. Jakowski

    2004-06-01

    Full Text Available An important part of the tasks of Working Group 2 of the COST Action 271 «Assessment of space plasma effect for satellites applications» is the assessment of novel data sources for information about the state of ionisation of the ionosphere. This report deals with those aspects which are not represented adequately in the scientific papers in this issue. Here emphasis is given to the product aspect (data and model collections, descriptions of methods and algorithms, availability of products, expected future developments and the links between the past COST Actions 238 and 251 with the present Action 271 and with possible future cooperations. Working Group 2 was leading in the transionospheric propagation aspects of possible products for the International Telecommunication Union?s Radiocommunication (ITU-R Study Group 3. This report gives a short overview emphasizing future developments.

  15. Principal working group No. 1 on operating experience and human factors (PWG1). Report of the task group on reviewing the activities

    International Nuclear Information System (INIS)

    2001-02-01

    A Task Group was formed by PWG-1 in the latter part of 1999 to review the mandate of PWG1 in light of new directions and assignments from CSNI, and to prepare a report that suggests future directions of the Working Group, in harmony with directions from CSNI. This report is the response of the Task Group. Principal Working Group no.1 was organized in September 1982. The group formed its charter, which included: - reviewing periodically activities for the collection, dissemination, storage and analysis of incidents reported under the IRS; - examining annually the incidents reported during the previous year in order to select issues (either technical or human-factor-oriented) with major safety significance and report them to CSNI; - encouraging feed-back through CSNI of lessons derived from operating experience to nuclear safety research programmes, including human factors studies; - providing a forum to exchange information in the field of human factors studies; - establishing short-term task forces, when necessary to carry out information exchange, special studies or any other work within its mandate; - making recommendations to CSNI for improving and encouraging these activities. The mandate of the working group was systematically re-examined in 1994. The purpose was to determine whether changes since the formation of the original mandate would indicate some need to refocus the directions of the working group. It was concluded that the main line of work (sometimes called the core business) of PWG1, which was shown to be an efficient tool for exchanging safety-significant operating experience and lessons learned from safety-significant issues, remained as valid and necessary in 1994 as it was in 1982. Some recommendations for improvement of efficiency were made, but the core business was unchanged. Very little of the mandate needed modification. With little change over nearly 20 years, these six items have constituted the mandate of PWG1. There have been twenty

  16. WLCG and IPv6 - the HEPiX IPv6 working group

    Science.gov (United States)

    Campana, S.; Chadwick, K.; Chen, G.; Chudoba, J.; Clarke, P.; Eliáš, M.; Elwell, A.; Fayer, S.; Finnern, T.; Goossens, L.; Grigoras, C.; Hoeft, B.; Kelsey, D. P.; Kouba, T.; López Muñoz, F.; Martelli, E.; Mitchell, M.; Nairz, A.; Ohrenberg, K.; Pfeiffer, A.; Prelz, F.; Qi, F.; Rand, D.; Reale, M.; Rozsa, S.; Sciaba, A.; Voicu, R.; Walker, C. J.; Wildish, T.

    2014-06-01

    The HEPiX (http://www.hepix.org) IPv6 Working Group has been investigating the many issues which feed into the decision on the timetable for the use of IPv6 (http://www.ietf.org/rfc/rfc2460.txt) networking protocols in High Energy Physics (HEP) Computing, in particular in the Worldwide Large Hadron Collider (LHC) Computing Grid (WLCG). RIPE NCC, the European Regional Internet Registry (RIR), ran out ofIPv4 addresses in September 2012. The North and South America RIRs are expected to run out soon. In recent months it has become more clear that some WLCG sites, including CERN, are running short of IPv4 address space, now without the possibility of applying for more. This has increased the urgency for the switch-on of dual-stack IPv4/IPv6 on all outward facing WLCG services to allow for the eventual support of IPv6-only clients. The activities of the group include the analysis and testing of the readiness for IPv6 and the performance of many required components, including the applications, middleware, management and monitoring tools essential for HEP computing. Many WLCG Tier 1/2 sites are participants in the group's distributed IPv6 testbed and the major LHC experiment collaborations are engaged in the testing. We are constructing a group web/wiki which will contain useful information on the IPv6 readiness of the various software components and a knowledge base (http://hepix-ipv6.web.cern.ch/knowledge-base). This paper describes the work done by the working group and its future plans.

  17. Intrinsic rewards experienced by a group of dentists working with underserved populations.

    Science.gov (United States)

    Gardner, S P; Roberts-Thomson, K F; Winning, T A; Peterson, R

    2014-09-01

    The aim of this study was to explore, using qualitative methods, the intrinsic reasons why dentists work with underserved groups. Minority and marginalized groups of Australians suffer a greater burden of dental disease than the general population due to disparities in accessing care. Recruitment and retention of dentists to care for underserved groups is problematic due to personal, professional and structural reasons. What drives dentists to work with underserved groups is not widely known. Sixteen dentists were recruited using 'snowball' purposeful sampling. Semi-structured in-depth interviews were conducted. Thematic analysis was conducted on the transcriptions to identify themes. Five key themes emerged: (1) 'tapped on the shoulder', being personally approached or invited; (2) 'dental school experience', the challenges faced as a student; (3) 'empathic concern', the non-judgemental expressions of care toward others; (4) 'resilience', the ability to bounce back after setbacks; (5) 'intrinsic reward', the personal gain and satisfaction received. This study focuses on the intrinsic rewards which were found to be simple, unexpected, and associated with relieving pain, community engagement and making a difference. Emphasizing personal fulfilment and intrinsic reward could be useful when promoting dentistry as a career and when encouraging graduates to consider working with disadvantaged groups. © 2014 Australian Dental Association.

  18. Big Data: Laying the Groundwork. ECAR Working Group Paper

    Science.gov (United States)

    Almes, Guy T.; Hillegas, Curtis W.; Lance, Timothy; Lynch, Clifford A.; Monaco, Gregory E.; Mundrane, Michael R.; Zottola, Ralph J.

    2014-01-01

    This paper is part of series of the EDUCAUSE Center for Analysis and Research Campus Cyberinfrastructure (ECAR-CCI) Working Group. The topic of big data continues to receive a great deal of publicity because of its promise for opening new avenues of scholarly discovery and commercial opportunity. The ability to sift rapidly through massive amounts…

  19. Summary for working group B on long-term stability

    International Nuclear Information System (INIS)

    Peggs, S.G.

    1992-01-01

    A total of 36 workshop participants attended at least one session of the Long-Term Stability working group. We avoided turning these sessions into a specialized seminar series by meeting in two subgroups, loosely labeled Analysis and Diffusion ampersand Tracking, so that working discussions among a reasonably small number of people were possible. Nonetheless, no attempt is made to categorize the 13 group B papers according to original subgroup. A similar workshop, the Workshop on Accelerator Orbit and Particle Tracking Problems, was held almost exactly 10 years ago at Brookhaven. It is interesting to see how many of the participants in the photograph of that workshop appear again in the photograph at the front of these proceedings. Fortunately, it is not correct to infer that little progress has been made in the last decade, nor that the average age of the participants has increased significantly. Rather, the recent photograph has many more, younger, faces than its predecessor. This attests to the ongoing interest and vigorous activity in an area of central importance to accelerator physics

  20. The Exclusive Group - Expatriates Working against Corporate Goals

    DEFF Research Database (Denmark)

    Lauring, Jakob

    2004-01-01

    Theories on expatriation have proposed international transfer as a mean to develop management capabilities and internationalise organisational communication networks. It has been argued that such developments are highly dependent on a sustained continual cross-cultural communication between...... as destructive towards overall corporate aims to internationalise and develop managerial and organisational competencies. Specifically excluding behaviour and cultural boundary creation of the expatriate group hindered the necessary cross-cultural communication and thereby working against corporate strategy...... of development....

  1. Working Group Report: Lattice Field Theory

    Energy Technology Data Exchange (ETDEWEB)

    Blum, T.; et al.,

    2013-10-22

    This is the report of the Computing Frontier working group on Lattice Field Theory prepared for the proceedings of the 2013 Community Summer Study ("Snowmass"). We present the future computing needs and plans of the U.S. lattice gauge theory community and argue that continued support of the U.S. (and worldwide) lattice-QCD effort is essential to fully capitalize on the enormous investment in the high-energy physics experimental program. We first summarize the dramatic progress of numerical lattice-QCD simulations in the past decade, with some emphasis on calculations carried out under the auspices of the U.S. Lattice-QCD Collaboration, and describe a broad program of lattice-QCD calculations that will be relevant for future experiments at the intensity and energy frontiers. We then present details of the computational hardware and software resources needed to undertake these calculations.

  2. Response to the Report of the Transfermium Working Group

    International Nuclear Information System (INIS)

    Armbruster, P.; Hessberger, F.P.; Hofmann, S.; Leino, M.; Muenzenberg, G.; Reisdorf, W.; Schmidt, K.-H.

    1993-01-01

    The research group at the Gesellschaft fuer Schwerionenforschung highly appreciates the efforts of the International Union of Applied Chemistry and the International Union of Applied Physics to solve the longstanding problem of the priority of discovery of the heaviest elements by appointing the Transfermium Working Group. This international group of renowned experts in nuclear physics and chemistry, headed by Sir Denys Wilkinson, established criteria for the discovery of a new element and on the basis judged on the priorities of the discoveries of the transfermium elements. Members of this group were scientists from countries not involved in the discovery of a new element. The criteria for the discovery of new elements were developed after a careful study of the literature and after visits to the involved laboratories. Permanent contact was established with the researchers concerned by distributing the protocols of the TWG meetings. Only this procedure made it possible that the criteria were adapted to the most recent experimental developments. (Author)

  3. Experiences of participating in return-to-work group programmes for people with musculoskeletal disorders: A focus group study.

    Science.gov (United States)

    Hamnes, Bente; Rønningen, Aud; Skarbø, Åse

    2017-09-01

    The present study aimed to explore the experiences of individuals with musculoskeletal disorders (MSDs) who had participated in return-to-work group programmes (RTW-GPs) and to assess whether the programmes had had an impact on their work disability. Three focus group interviews and one individual interview were conducted involving 17 women (mean age = 47) with MSDs who had completed RTW-GPs. All interviews were audio-recorded, transcribed verbatim and analysed using thematic analyses. Participant experiences were categorised into three main themes: changed way of thinking, the importance of being able to work, and a changed lifestyle. The respondents said that participation in the RTW-GPs had enabled them to shift their focus from problems to opportunities. They had become more aware of strategies to enhance their energy levels and continue working. Several participants had reduced their work hours to achieve a better balance between work and daily life. Many participants had also changed their lifestyle habits, which had led to weight reduction, more energy and less pain. The study participants had attained a heightened awareness of what they could do to continue working. Many participants had introduced changes in their daily lives, with consequences for employment, social life and lifestyle. The findings suggest that RTW-GPs can help people with MSDs to remain in employment and prevent absenteeism. Copyright © 2017 John Wiley & Sons, Ltd.

  4. Closing plenary summary of working group 4 instrumentation and controls for ERL2011

    Energy Technology Data Exchange (ETDEWEB)

    Gassner, D.; Obina, T.

    2011-10-16

    Working group 4 was charged with presentations and discussions on instrumentation and controls with regards to Energy Recovery Linacs (ERL). There were 4 sessions spanning 3.5 hours in which 7 talks were delivered, the first being an invited plenary presentation. The time allotted for each talk was limited to 20-25 minutes in order to allow 5-10 minutes for discussion. Most of the talks were held in joint session with working group 5 (Unwanted Beam Loss). This format was effective for the purpose of this workshop. A final series of discussion sessions were also held with working group 5. Summary of the working group 4 activities, presented in the closing plenary session. We had a plenary presentation on operational performance, experience, and future plans at the existing ERL injector prototype at Cornell. This included instrumentation data, controls system configurations, as well as description of future needs. This was followed by four talks from KEK and RIKEN/SPring-8 that described electron beam instrumentation already in use or under development that can be applied to ERL facilities. The final talks described the ERLs under construction at KEK and BNL. The format of having joint sessions with working group 5 was beneficial as there were a significant number of common topics and concerns with regards to the causes of beam loss, instrumentation hardware, and techniques used to measure and analyze beam loss.

  5. Forming identities in residential care for children: Manoeuvring between social work and peer groups

    DEFF Research Database (Denmark)

    Stokholm, Anja

    2009-01-01

    in the pedagogical work. This article challenges the implicit understanding that social work is the primary source of identity transformation and that peer group interaction is mainly an obstacle to overcome. On the contrary, this article argues that learning about the social dynamics of the children's group...... is a precondition for understanding how social work influences individual children. © The Author(s), 2009....

  6. Using Social Justice Group Work with Young Mothers Who Experience Homelessness

    Science.gov (United States)

    Coker, Angela D.; Meyer, Dixie; Smith, Rachelle; Price, Amber

    2010-01-01

    Research indicates (e.g., Bassuk et al., 1997) that women and children make up a large percentage of the total number of individuals living without permanent shelter. This article represents a reflective analysis of our work as group facilitators who conducted a series of personal growth groups for young mothers living in a residential facility…

  7. Making Cooperative Learning Groups Work.

    Science.gov (United States)

    Hawley, James; De Jong, Cherie

    1995-01-01

    Discusses the use of cooperative-learning groups with middle school students. Describes cooperative-learning techniques, including group roles, peer evaluation, and observation and monitoring. Considers grouping options, including group size and configuration, dyads, the think-pair-share lecture, student teams achievement divisions, jigsaw groups,…

  8. Early sex work initiation independently elevates odds of HIV infection and police arrest among adult sex workers in a Canadian setting.

    Science.gov (United States)

    Goldenberg, Shira M; Chettiar, Jill; Simo, Annick; Silverman, Jay G; Strathdee, Steffanie A; Montaner, Julio S G; Shannon, Kate

    2014-01-01

    To explore factors associated with early sex work initiation and model the independent effect of early initiation on HIV infection and prostitution arrests among adult sex workers (SWs). Baseline data (2010-2011) were drawn from a cohort of SWs who exchanged sex for money within the last month and were recruited through time location sampling in Vancouver, Canada. Analyses were restricted to adults ≥18 years old. SWs completed a questionnaire and HIV/sexually transmitted infection testing. Using multivariate logistic regression, we identified associations with early sex work initiation (prostitution arrests among adult SWs. Of 508 SWs, 193 (38.0%) reported early sex work initiation, with 78.53% primarily street-involved SWs and 21.46% off-street SWs. HIV prevalence was 11.22%, which was 19.69% among early initiates. Early initiates were more likely to be Canadian born [adjusted odds ratio (AOR): 6.8, 95% confidence interval (CI): 2.42 to 19.02], inject drugs (AOR: 1.6, 95% CI: 1.0 to 2.5), and to have worked for a manager (AOR: 2.22, 95% CI: 1.3 to 3.6) or been coerced into sex work (AOR: 2.3, 95% CI: 1.14 to 4.44). Early initiation retained an independent effect on increased risk of HIV infection (AOR: 2.5, 95% CI: 1.3 to 3.2) and prostitution arrests (AOR: 2.0, 95% CI: 1.3 to 3.2). Adolescent sex work initiation is concentrated among marginalized, drug, and street-involved SWs. Early initiation holds an independent increased effect on HIV infection and criminalization of adult SWs. Findings suggest the need for evidence-based approaches to reduce harm among adult and youth SWs.

  9. Challenges in the transition to clinical training in dentistry: An ADEE special interest group initial report.

    Science.gov (United States)

    Serrano, C M; Botelho, M G; Wesselink, P R; Vervoorn, J M

    2018-02-03

    Curricular integration in higher education has been widely supported in the educational literature. As a result, several health care and specifically dental curricula have evolved from compartmentalised disciplinary training to integrated modalities; however, in many courses, a pre-clinical-clinical watershed remains a barrier to integration in dental education. This article introduces a general description of the pre-clinical-clinical transition in dentistry according to the outcomes of the discussion held during the first working group session of the "Transition to Clinical Training" Special Interest Group during the 2016 annual meeting of the Association for Dental Education in Europe. An online questionnaire was made available before the meeting to survey the curricular characteristics of the participants' schools. During the meeting, a working session related to the pre-clinical-clinical transition occurred. Conclusions from the discussion are summarised in this article. Fourteen dental schools from 12 countries participated in the online survey. The included programmes had an average duration of 5.3 years (SD = 0.48), with high school or the local equivalent as the required entrance level for dentistry. The hybrid curriculum was the leading curriculum design (n = 9) followed by competence-based curricula (n = 3), with patient treatment as the core of clinical training in every included programme. The pre-clinical-clinical transition in dentistry is a recognisable matter in dental education that requires assessment and research to ease the management of a stage with relevant influence on educational outcomes. This article presents an initial framework for further research and educational intervention. © 2018 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  10. 77 FR 1778 - U.S.-EU High Level Working Group on Jobs and Growth

    Science.gov (United States)

    2012-01-11

    ... growth, and international competitiveness. The Leaders also asked the Working Group to work closely with public and private sector stakeholder groups, and to draw on existing dialogues and mechanisms, as..., and competitiveness; the feasibility; and the implications for, and consistency with, bilateral and...

  11. Developing a parent-professional team leadership model in group work: work with families with children experiencing behavioral and emotional problems.

    Science.gov (United States)

    Ruffolo, Mary C; Kuhn, Mary T; Evans, Mary E

    2006-01-01

    Building on the respective strengths of parent-led and professional-led groups, a parent-professional team leadership model for group interventions was developed and evaluated for families of youths with emotional and behavioral problems. The model was developed based on feedback from 26 parents in focus group sessions and recommendations from mental health professionals in staff meetings. Evaluations of an implementation of the model in a support, empowerment, and education group intervention (S.E.E. group) have demonstrated the usefulness of this approach in work with families of children with behavioral and emotional problems. This article discusses the challenges of instituting the model in an S.E.E. group. It explores how parents and professionals build the team leadership model and the strengths of this approach in working with parents of youths with serious emotional disturbances.

  12. Work situation and sickness absence in the initial period after breast cancer surgery.

    Science.gov (United States)

    Petersson, Lena-Marie; Wennman-Larsen, Agneta; Nilsson, Marie; Olsson, Mariann; Alexanderson, Kristina

    2011-02-01

    Breast cancer is the most common cancer diagnosis in women, many of whom are of working age, and the five-year survival rate in Sweden is approaching 90%. Accordingly, aspects of working life and sickness absence are of increasing importance for breast cancer survivors and may have a long-term impact on health and quality of life of these women. The aim was to elucidate the work situation and sickness absence during the initial period after breast cancer surgery and to explore factors associated with sickness absence. This is a cross-sectional questionnaire study 4-6 weeks after breast cancer surgery of women aged 20-63 years, and living in Stockholm. A consecutive sample of 933 women were invited and 756 (81%) accepted to participate. Logistic regression analyses were computed to estimate crude and adjusted odds ratios for associations between sick leave and other variables. Most women (86%) were employed (including self-employed) at diagnosis, and 91% of those worked ≥75% of full-time. At time of survey, 56% were on sick leave, the majority for full-time. Low self-rated health, poorer health than before diagnosis, having a strenuous work posture, and younger age were associated with sick leave during the initial period after breast cancer surgery in both univariate and multivariate analyses. The results of this study is not fully consistent compared to previous studies in this field, often performed in later phases after breast cancer surgery or after other cancer diagnoses. Therefore our results indicate that knowledge is needed during all phases of the breast cancer trajectory to determine factors of importance regarding sick leave and their impact throughout the disease trajectory.

  13. Working Group 1: Software System Design and Implementation for Environmental Modeling

    Science.gov (United States)

    ISCMEM Working Group One Presentation, presentation with the purpose of fostering the exchange of information about environmental modeling tools, modeling frameworks, and environmental monitoring databases.

  14. Summary of the particle physics and technology working group

    International Nuclear Information System (INIS)

    Stephan Lammel et al. email = crathbun@fnal.gov

    2002-01-01

    Progress in particle physics has been tightly related to technological advances during the past half century. Progress in technologies has been driven in many cases by the needs of particle physics. Often, these advances have benefited fields beyond particle physics: other scientific fields, medicine, industrial development, and even found commercial applications. The particle physics and technology working group of Snowmass 2001 reviewed leading-edge technologies recently developed or in the need of development for particle physics. The group has identified key areas where technological advances are vital for progress in the field, areas of opportunities where particle physics may play a principle role in fostering progress, and areas where advances in other fields may directly benefit particle physics. The group has also surveyed the technologies specifically developed or enhanced by research in particle physics that benefit other fields and/or society at large

  15. Uganda group works to reduce AIDS' impact.

    Science.gov (United States)

    Mcbrier, P

    1996-10-01

    War and AIDS-related mortality in Uganda have created an estimated 1.2 million orphans in the country. Child welfare advocates and nongovernmental organizations (NGOs) have therefore been working together for the past 4 years under an umbrella organization to coordinate efforts for vulnerable children. The Uganda Community-Based Association for Child Welfare (UCOBAC), links people and organizations involved in child advocacy, facilitates relations between the government and NGOs, and helps to strengthen the capacity of NGOs to identify and implement projects. UCOBAC emphasizes community-based initiatives which allow children to remain in their own communities instead of being institutionalized. One example of such an approach is a vocational skills training program in Rakai district established to help young orphans trying to make it on their own. More than 300 youths had benefitted from the program as of December 1994 and plans are underway to expand the program to 10 more districts. UCOBAC is also training communities and NGOs to identify and implement viable projects, and helps child welfare organizations by serving as a network for sharing information. UCOBAC came into existence in October 1990 with 93 members, including 57 local NGOs, 17 international NGOs, and 19 individual members. The organization has since established local offices in 35 of Uganda's 39 districts. UNICEF has thus far provided about US$130,000 for UCOBAC activities and will continue to fund local NGO initiatives through UCOBAC. UCOBAC, however, is giving priority to becoming financially independent of UNICEF within a couple of years. Future projects include an inventory of NGO child welfare projects, a child welfare resource library, and networking workshops with NGOs and government policymakers.

  16. Management of relapsed multiple myeloma: recommendations of the International Myeloma Working Group.

    Science.gov (United States)

    Laubach, J; Garderet, L; Mahindra, A; Gahrton, G; Caers, J; Sezer, O; Voorhees, P; Leleu, X; Johnsen, H E; Streetly, M; Jurczyszyn, A; Ludwig, H; Mellqvist, U-H; Chng, W-J; Pilarski, L; Einsele, H; Hou, J; Turesson, I; Zamagni, E; Chim, C S; Mazumder, A; Westin, J; Lu, J; Reiman, T; Kristinsson, S; Joshua, D; Roussel, M; O'Gorman, P; Terpos, E; McCarthy, P; Dimopoulos, M; Moreau, P; Orlowski, R Z; Miguel, J S; Anderson, K C; Palumbo, A; Kumar, S; Rajkumar, V; Durie, B; Richardson, P G

    2016-05-01

    The prognosis for patients multiple myeloma (MM) has improved substantially over the past decade with the development of new, more effective chemotherapeutic agents and regimens that possess a high level of anti-tumor activity. In spite of this important progress, however, nearly all MM patients ultimately relapse, even those who experience a complete response to initial therapy. Management of relapsed MM thus represents a vital aspect of the overall care for patients with MM and a critical area of ongoing scientific and clinical research. This comprehensive manuscript from the International Myeloma Working Group provides detailed recommendations on management of relapsed disease, with sections dedicated to diagnostic evaluation, determinants of therapy, and general approach to patients with specific disease characteristics. In addition, the manuscript provides a summary of evidence from clinical trials that have significantly impacted the field, including those evaluating conventional dose therapies, as well as both autologous and allogeneic stem cell transplantation. Specific recommendations are offered for management of first and second relapse, relapsed and refractory disease, and both autologous and allogeneic transplant. Finally, perspective is provided regarding new agents and promising directions in management of relapsed MM.

  17. Sex work, reform initiatives and HIV/AIDS in inner-city Johannesburg.

    Science.gov (United States)

    Richter, Marlise

    2008-11-01

    The on-going criminalisation of sex work in South Africa, concurrent sexual partnerships, socio-economic vulnerability, migrant status and gender-based violence intensify sex workers' risk of contracting HIV. These factors combine to restrict the skills, ability and resources of sex workers to negotiate safer sex and to access HIV prevention, treatment and healthcare services. The paper situates the living and working conditions of sex workers in Hillbrow, an inner-city area of Johannesburg, within the South African legal context, especially in regard to current law reform initiatives regarding sex work, as well as the increasing anxiety about the influx of (sex) tourists during the 2010 FIFA World Cup. In addition, the paper describes an intervention by the Reproductive Health & HIV Research Unit at the University of the Witwatersrand, Johannesburg, an innovator in providing mobile healthcare services and education to hotel-based sex workers in Hillbrow. The paper contends that a legal-rights-approach to HIV risk and vulnerability, together with powerful public health considerations, render decriminalisation an imperative response to sex workers' material conditions.

  18. Report of the working group for nuclear damage compensation system

    International Nuclear Information System (INIS)

    1989-01-01

    The Working Group for Nuclear Damage Compensation System was established within the Atomic Energy Commision of Japan on August 2, 1988. The Group has held five meetings to make a study on the revision of the reserve for nuclear damage compensation. The nuclear damage compensation system in Japan has been established under the Law Concerning Compensation for Nuclear Damages and the Law Concerning Contract for Compensation for Nuclear Damages. The former law requires the nuclear power plant operators to set up a reserve for damage compensation to ensure positive and quick payment of compensation in the event of an accident. The reserve is currently rely on liability insurance and a government compensation contract. The Working Group has concluded that the total reserve should be increased from the current yen10 bill. to yen30 bill. The amount of the reserve specified in the enforcement law for the Law Concerning Compensation for Nuclear Damages should also be increased accordingly. The Law Concerning compensation for Nuclear damage will also be applied to damage which occurs overseas as a result of an accident in Japan. (N.K.)

  19. Progress Report on the Airborne Metadata and Time Series Working Groups of the 2016 ESDSWG

    Science.gov (United States)

    Evans, K. D.; Northup, E. A.; Chen, G.; Conover, H.; Ames, D. P.; Teng, W. L.; Olding, S. W.; Krotkov, N. A.

    2016-12-01

    NASA's Earth Science Data Systems Working Groups (ESDSWG) was created over 10 years ago. The role of the ESDSWG is to make recommendations relevant to NASA's Earth science data systems from users' experiences. Each group works independently focusing on a unique topic. Participation in ESDSWG groups comes from a variety of NASA-funded science and technology projects, including MEaSUREs and ROSS. Participants include NASA information technology experts, affiliated contractor staff and other interested community members from academia and industry. Recommendations from the ESDSWG groups will enhance NASA's efforts to develop long term data products. The Airborne Metadata Working Group is evaluating the suitability of the current Common Metadata Repository (CMR) and Unified Metadata Model (UMM) for airborne data sets and to develop new recommendations as necessary. The overarching goal is to enhance the usability, interoperability, discovery and distribution of airborne observational data sets. This will be done by assessing the suitability (gaps) of the current UMM model for airborne data using lessons learned from current and past field campaigns, listening to user needs and community recommendations and assessing the suitability of ISO metadata and other standards to fill the gaps. The Time Series Working Group (TSWG) is a continuation of the 2015 Time Series/WaterML2 Working Group. The TSWG is using a case study-driven approach to test the new Open Geospatial Consortium (OGC) TimeseriesML standard to determine any deficiencies with respect to its ability to fully describe and encode NASA earth observation-derived time series data. To do this, the time series working group is engaging with the OGC TimeseriesML Standards Working Group (SWG) regarding unsatisfied needs and possible solutions. The effort will end with the drafting of an OGC Engineering Report based on the use cases and interactions with the OGC TimeseriesML SWG. Progress towards finalizing

  20. International Work Group Criteria for the Diagnosis of Alzheimer Disease

    NARCIS (Netherlands)

    Cummings, J.L.; Dubois, B; Molinuevo, J.L.; Scheltens, P.

    2013-01-01

    Alzheimer-type biomarker changes are identifiable in asymptomatic and mildly symptomatic predementia phases of Alzheimer disease (AD) and AD dementia. The International Work Group (IWG) guidelines for diagnosis identify a unified spectrum of 3 phases. The classic clinical feature that indicates AD

  1. Working Group Proposed to Preserve Archival Records

    Science.gov (United States)

    Bartlett, Jennifer L.

    2013-01-01

    The AAS and AIP co-hosted a Workshop in April 2012 with NSF support (AST-1110231) that recommends establishing a Working Group on Time Domain Astronomy (WGTDA) to encourage and advise on preserving historical observations in a form meaningful for future scientific analysis. Participants specifically considered archival observations that could describe how astronomical objects change over time. Modern techniques and increased storage capacity enable extracting additional information from older media. Despite the photographic plate focus, other formats also concerned participants. To prioritize preservation efforts, participants recommended considering the information density, the amount of previously published data, their format and associated materials, their current condition, and their expected deterioration rate. Because the best digitization still produces an observation of an observation, the originals should be retained. For accessibility, participants recommended that observations and their metadata be available digitally and on-line. Standardized systems for classifying, organizing, and listing holdings should enable discovery of historical observations through the Virtual Astronomical Observatory. Participants recommended pilot projects that produce scientific results, demonstrate the dependence of some advances on heritage data, and open new avenues of exploration. Surveying a broad region of the sky with a long time-base and high cadence should reveal new phenomena and improve statistics for rare events. Adequate financial support is essential. While their capacity to produce new science is the primary motivation for preserving astronomical records, their potential for historical research and citizen science allows targeting cultural institutions and other private sources. A committee was elected to prepare the WGTDA proposal. The WGTDA executive committee should be composed of ~10 members representing modern surveys, heritage materials, data management

  2. Process-orientated psychoanalytic work in initial interviews and the importance of the opening scene.

    Science.gov (United States)

    Wegner, Peter

    2014-06-01

    From the very first moment of the initial interview to the end of a long course of psychoanalysis, the unconscious exchange between analysand and analyst, and the analysis of the relationship between transference and countertransference, are at the heart of psychoanalytic work. Drawing on initial interviews with a psychosomatically and depressively ill student, a psychoanalytic understanding of initial encounters is worked out. The opening scene of the first interview already condenses the central psychopathology - a clinging to the primary object because it was never securely experienced as present by the patient. The author outlines the development of some psychoanalytic theories concerning the initial interview and demonstrates their specific importance as background knowledge for the clinical situation in the following domains: the 'diagnostic position', the 'therapeutic position', the 'opening scene', the 'countertransference' and the 'analyst's free-floating introspectiveness'. More recent investigations refer to 'process qualities' of the analytic relationship, such as 'synchronization' and 'self-efficacy'. The latter seeks to describe after how much time between the interview sessions constructive or destructive inner processes gain ground in the patient and what significance this may have for the decision about the treatment that follows. All these factors combined can lead to establishing a differential process-orientated indication that also takes account of the fact that being confronted with the fear of unconscious processes of exchange is specific to the psychoanalytic profession. Copyright © 2014 Institute of Psychoanalysis.

  3. Predicted radionuclide release from marine reactors dumped in the Kara Sea. Report of the source term working group of the international arctic seas assessment project (IASAP)

    International Nuclear Information System (INIS)

    1997-04-01

    The present report summarizes the work carried out by the Source Term Working Group of IASAP during 1994-1996. The report is based on the studies concerning the initial and current radionuclide inventories, operational history and construction of the reactors carried out by Y. Sivintsev of the Russian Research Center ''Kurchatov Institute'', Moscow and E. Yefimov of the Institute of Physics and Power Engineering, Obninsk, Russian Federation. The working group convened five times and evaluated the results of the studies and developed models for prediction of potential releases to the environment. The calculations were carried out at the Royal Naval College, Greenwich, UK, by N. Lynn, J. Warden and S. Timms and at the Lawrence Livermore National Laboratory, California, USA, by M. Mount. 31 refs, 36 figs, 18 tabs

  4. The HEPiX Virtualisation Working Group: Towards a “Grid of Clouds”

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    The HEPiX Virtualisation Working Group has sponsored the development of policies and technologies that permit Grid sites to safely instantiate remotely generated virtual machine images confident in the knowledge that they will be able to meet their obligations, most notably in terms of guaranteeing the accountability and traceability of any Grid Job activity at their site. We will present the current status of the HEPiX Virtualisation Working Group technology and or links to related projects, notably StratusLab. We will also comment on the utility of our work in enabling a move from a Grid environment to a “Grid of Clouds” to provide a more responsive service to end users and reduce the service management load at participating sites.

  5. Early sex work initiation independently elevates odds of HIV infection and police arrest among adult sex workers in a Canadian setting

    Science.gov (United States)

    GOLDENBERG, Shira M.; CHETTIAR, Jill; SIMO, Annick; SILVERMAN, Jay G.; STRATHDEE, Steffanie A.; MONTANER, Julio; SHANNON, Kate

    2014-01-01

    Objectives To explore factors associated with early sex work initiation, and model the independent effect of early initiation on HIV infection and prostitution arrests among adult sex workers (SWs). Design Baseline data (2010–2011) were drawn from a cohort of SWs who exchanged sex for money within the last month and were recruited through time-location sampling in Vancouver, Canada. Analyses were restricted to adults ≥18 years old. Methods SWs completed a questionnaire and HIV/STI testing. Using multivariate logistic regression, we identified associations with early sex work initiation (prostitution arrests among adult SWs. Results Of 508 SWs, 193 (38.0%) reported early sex work initiation, with 78.53% primarily street-involved SWs and 21.46% off-street SWs. HIV prevalence was 11.22%, which was 19.69% among early initiates. Early initiates were more likely to be Canadian-born (Adjusted Odds Ratio (AOR): 6.8, 95% Confidence Interval (CI): 2.42–19.02), inject drugs (AOR: 1.6, 95%CI: 1.0–2.5), and to have worked for a manager (AOR: 2.22, 95%CI: 1.3–3.6) or been coerced into sex work (AOR: 2.3, 95%CI: 1.14–4.44). Early initiation retained an independent effect on increased risk of HIV infection (AOR: 2.5, 95% CI: 1.3–3.2) and prostitution arrests (AOR: 2.0, 95%CI: 1.3–3.2). Conclusions Adolescent sex work initiation is concentrated among marginalized, drug and street-involved SWs. Early initiation holds an independent increased effect on HIV infection and criminalization of adult SWs. Findings suggest the need for evidence-based approaches to reduce harm among adult and youth SWs. PMID:23982660

  6. Immunotherapy Response Assessment in Neuro-Oncology (iRANO): A Report of the RANO Working Group

    Science.gov (United States)

    Okada, Hideho; Weller, Michael; Huang, Raymond; Finocchiaro, Gaetano; Gilbert, Mark R.; Wick, Wolfgang; Ellingson, Benjamin M.; Hashimoto, Naoya; Pollack, Ian F.; Brandes, Alba A.; Franceschi, Enrico; Herold-Mende, Christel; Nayak, Lakshmi; Panigrahy, Ashok; Pope, Whitney B.; Prins, Robert; Sampson, John H.; Wen, Patrick Y.; Reardon, David A.

    2015-01-01

    Immunotherapy represents a promising area of therapy among neuro-oncology patients. However, early phase studies reveal unique challenges associated with assessment of radiological changes reflecting delayed responses or therapy-induced inflammation. Clinical benefit, including long-term survival and tumor regression, can still occur following initial apparent progression or appearance of new lesions. Refinement of response assessment criteria for neuro-oncology patients undergoing immunotherapy is therefore warranted. A multinational and multidisciplinary panel of neuro-oncology immunotherapy experts describes immunotherapy response assessment for neuro-oncology (iRANO) criteria that are based on guidance for determination of tumor progression outlined by the immune-related response criteria (irRC) and the response assessment in neuro-oncology (RANO) working group. Among patients who demonstrate imaging findings meeting RANO criteria for progressive disease (PD) within six months of initiating immunotherapy including the development of new lesions, confirmation of radiographic progression on follow-up imaging is recommended provided that the patient is not significantly worse clinically. The proposed criteria also include guidelines for use of corticosteroids. The role of advanced imaging techniques and measurement of clinical benefit endpoints including neurologic and immunologic functions are reviewed. The iRANO guidelines put forth herein will evolve successively to improve their utility as further experience from immunotherapy trials in neuro-oncology accumulate. PMID:26545842

  7. 77 FR 36529 - Apple Group LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

    Science.gov (United States)

    2012-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-4657-001] Apple Group LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Apple Group LLC...

  8. 77 FR 70421 - GPS Satellite Simulator Control Working Group Meeting

    Science.gov (United States)

    2012-11-26

    ... DEPARTMENT OF DEFENSE Department of the Air Force GPS Satellite Simulator Control Working Group Meeting AGENCY: Space and Missile Systems Center, Global Positioning Systems (GPS) Directorate, Department of the Air Force, DoD. ACTION: Meeting Notice. SUMMARY: This meeting notice is to inform GPS...

  9. The European vocation of the Romanian Atomic Forum. Participation to the FORATOM working groups

    International Nuclear Information System (INIS)

    Chirica, Teodor

    2004-01-01

    ROMATOM, the Romanian Atomic Forum, participates in the activity of the following FORATOM working groups: Quality Management, Business Excellence, Accession Task Force, Radioactive Waste Management, Civil Liability and Law Aspects, Climatic Changes. Recently, Romania was invited to attend the working groups for Research and Development and Community Waste Management

  10. Increasing Organizational Performance through Diversity and Organizational Climate Initiatives: What works, what doesn't (Japanese)

    OpenAIRE

    TANIGUCHI Mami

    2014-01-01

    Globalization of business leads to environmental uncertainty for corporate organizations. To establish competitive advantage, organizations need continuous introduction of new products and services to markets and quick implementation of new strategies. This paper shows what kinds of initiatives are required for companies to leverage a diverse workforce. Study 1 explores diversity initiatives that are effective in terms of innovativeness by dividing companies into three groups based on gender ...

  11. Work group design in pharmacy: the pharmacist-technician team.

    Science.gov (United States)

    Kershaw, B P; Solomon, D K; Zarowitz, B J

    1987-05-01

    The contemporary pharmacy practice manager faces the challenge of designing pharmacy service programs that not only satisfy the needs of the patient, but at the same time satisfy and motivate the pharmacists and technicians who sustain the programs. This research examined the team design, which has been recommended but not fully described in the literature. This application did not explore the full potential of the team design in the hospital pharmacy setting. More study is needed in this area to assess the impact of work group design on the expansion of clinical programs, employee turnover rates, quality and quantity of work produced, and, most important, the impact on job satisfaction enjoyed by pharmacists and technicians.

  12. Group attributional training as an effective approach to human resource development under team work systems.

    Science.gov (United States)

    Wang, Z M

    1994-07-01

    An experimental programme of group attributional training under team work system was conducted as part of human resource development in Chinese industrial enterprises. One hundred and ten shopfloor employees participated in the study. Among them, 58 employees took part in the factorial-designed experiment to find out the effects of attributions on performance, and 52 employees of ten work groups participated in the group attributional training programme twice a week for two months. The results showed that the group attributional training was effective in modifying employees' attributional patterns and enhancing group performance and satisfaction. On the basis of the results, an attributional model of work motivation is proposed, and its theoretical and practical implications for human resource management discussed.

  13. The Nuclear Smuggling International Technical Working Group: Making a difference in combating illicit trafficking

    International Nuclear Information System (INIS)

    Niemeyer, S.; Koch, L.

    2002-01-01

    Full text: The ITWG was first formed in 1995 for the purpose of fostering international cooperation for combating illicit trafficking of nuclear materials. The initial focus for the ITWG was on the development of nuclear forensics to help answer attribution questions regarding nuclear materials of unknown origin. More recently, the ITWG has also expanded its focus to include detection of nuclear materials during transit. This paper presents some of the key developments by this group and their potential impact for combating nuclear smuggling. The initial focus of the ITWG was to write a status report on international cooperation on nuclear smuggling forensic analysis. This 26-page report summarized previous work on nuclear forensics and gave an initial analysis on prioritizing techniques and methods for forensic analysis regarding source and route attribution. This report was submitted to the G-8 countries, and shortly thereafter, nuclear forensics was endorsed at the Moscow Summit in April, 1996, as part of an illicit trafficking program. The work of the ITWG has also been noted at subsequent summit declarations, e.g. Cologne. The ITWG's primary goal is to develop a preferred approach to nuclear forensic investigations that is widely understood and accepted as credible. The technical elements include: 1) development of protocols for a) collection and preservation of evidence and b) for laboratory investigation, 2) prioritizing of techniques for forensic analysis, 3) development of forensic databanks to assist in interpretation, 4) executing inter-laboratory exercises, and 5) facilitating technical assistance to countries upon request. The development of protocols has been conducted jointly by law enforcement officials and laboratory scientists. A major focus during much of the past six years has been the development of a model action plan for nuclear forensics. This action plan lays out the elements that are needed in the instance that illicit nuclear material is

  14. Summary of conclusions of the vacuum photodiode working group

    International Nuclear Information System (INIS)

    Willis, W.

    1988-01-01

    This report presents the design of a 30 MV gun. In considering the design of the vacuum photodiode switched to drive the accelerating field in the gun, we have paid attention to the work of the groups on high-voltage pulsing and on the design of the laser. We have found that we can trade off reduced laser power at the cost of a higher charging voltage for our one stage accelerator. We have presented the various parameter sets to the two groups and attempted to measure their enthusiasm for each set, and we have chosen the set that seems to provide an equal level of difficulty on both sides. 1 fig., 1 tab

  15. Trans-disciplinary community groups: an initiative for improving healthcare.

    Science.gov (United States)

    Sideras, James Demetri

    2016-01-01

    In the context of budget constraints and the current quality crisis facing UK healthcare, the purpose of this paper is to examine the use of trans-disciplinary community groups (TCG)--an innovative and inexpensive initiative for improving patient care. Using an action research study, TCG was implemented within a private healthcare firm for vulnerable adults. Qualitative data were gathered over 12 months from 33 participants using depth interviews and focus groups. TCG led to improved patient activities and increased patient decision-making and confidence in self-advocacy. Key prerequisites were top management commitment, democratic leadership and employee empowerment. However, staff nurses resisted TCG because they were inclined to using managerial control and their own independent clinical judgements. Whilst the findings from this study should not be generalized across all healthcare sectors, its results could be replicated in contexts where there is wide commitment to TCG and where managers adopt a democratic style of leadership. Researchers could take this study further by exploring the applicability of TCG in public healthcare organizations or other multi-disciplinary service contexts. The findings of this research paper provide policy makers and healthcare managers with practical insights on TCG and the factors that are likely to obstruct and facilitate its implementation. Adopting TCG could enable healthcare managers to ameliorate their services with little or no extra cost, which is especially important in a budget constraint context and the current quality crisis facing UK healthcare.

  16. Investigating the LGBTQ Responsive Model for Supervision of Group Work

    Science.gov (United States)

    Luke, Melissa; Goodrich, Kristopher M.

    2013-01-01

    This article reports an investigation of the LGBTQ Responsive Model for Supervision of Group Work, a trans-theoretical supervisory framework to address the needs of lesbian, gay, bisexual, transgender, and questioning (LGBTQ) persons (Goodrich & Luke, 2011). Findings partially supported applicability of the LGBTQ Responsive Model for Supervision…

  17. 78 FR 63459 - GPS Satellite Simulator Control Working Group Meeting

    Science.gov (United States)

    2013-10-24

    ... DEPARTMENT OF DEFENSE Air Force GPS Satellite Simulator Control Working Group Meeting AGENCY: Department of the Air Force. ACTION: Meeting Notice. SUMMARY: This meeting notice is to inform GPS simulator manufacturers, who supply products to the Department of Defense (DoD), and GPS simulator users, both government...

  18. Web Environments for Group-Based Project Work in Higher Education

    NARCIS (Netherlands)

    Andernach, J.A.; van Diepen, N.M.; Collis, Betty; Andernach, Toine

    1997-01-01

    We discuss problems confronting the use of group-based project work as an instructional strategy in higher education and describe two courses in which course-specific World Wide Web (Web) environments have evolved over a series of course sequences and are used both as tool environments for

  19. AER Working Group D on VVER safety analysis - report of the 2009 meeting

    International Nuclear Information System (INIS)

    Kliem, S.

    2009-01-01

    The AER Working Group D on VVER reactor safety analysis held its 18-th meeting in Rez, Czech Republic, during the period 18-19 May, 2009. The meeting was hosted by the Nuclear Research Institute Rez. Altogether 17 participants attended the meeting of the working group D, 16 from AER member organizations and 1 guest from a non-member organization. The co-ordinator of the working group, S. Kliem, served as chairman of the meeting. The meeting started with a general information exchange about the recent activities in the participating organizations. The given presentations and the discussions can be attributed to the following topics: 1) Code validation and benchmarking; 2) Safety analysis and code developments; 3) Reactor pressure vessel thermal hydraulics; 4) Future activities including discussion on the participation in the OECD/NEA Benchmark for the Kalinin-3 NPP

  20. OECD-NEA criticality working group - a status report and the burnup credit challenge

    International Nuclear Information System (INIS)

    Whitesides, G.E.

    1993-01-01

    A Working Group established by the organization for Economic Co-operation and Development's Nuclear Energy Agency (OECD-NEA), Paris, has examined the validity of computational methods used for calculations that evaluate the nuclear criticality safety issues involved in the storage, handling and transportation of fissile materials. The basic goal of this Working Group is to attempt to define and implement a procedure that can be shown to demonstrate the validity of the various computational methods used to make criticality safety calculations. The current activities of the Working Group involve an effort to establish the validity of computational methods used to evaluate the criticality safety of the storage, handling, and transportation of spent light-water-reactor fuel elements in which one seeks to take credit for the fissile material burnup and/or buildup of fission products. (J.P.N.)

  1. Activities of the PNC Nuclear Safety Working Group

    International Nuclear Information System (INIS)

    Kato, W.Y.

    1991-01-01

    The Nuclear Safety Working Group of the Pacific Nuclear Council promotes nuclear safety cooperation among its members. Status of safety research, emergency planning, development of lists of technical experts, severe accident prevention and mitigation have been the topics of discussion in the NSWG. This paper reviews and compares the severe accident prevention and mitigation program activities in some of the areas of the Pacific Basin region based on papers presented at a special session organized by the NSWG at an ANS Topical Meeting as well as papers from other sources

  2. Government's role in power supply security. A working group report

    International Nuclear Information System (INIS)

    2004-01-01

    The working group was to analyse the Government's role in terms of improving the security of supply of the electricity market in exceptionally difficult capacity situations and to make propositions for the ways of arranging a tendering procedure concerning security of supply and capacity control, so as to meet the requirements of the EC Energy Internal Market Directives after 1 July 2004. The Working Group considers that there is no need at this stage to introduce a separate new system intended as a supplement to technical reserves in Finland. Such a system would not bring new capacity for the use of the power system, and in the case of existing capacity, production would only be transferred from one market to another. However, the situation may change from this, if there occur such factors on the market that aim to raise the market price of electricity or if it turned out that reserve power plants would be decommissioned on a large scale. The working group proposes that such a provision be added to the Electricity Market Act that would oblige the electricity supplier to notify the Energy Market Authority of a planned service outage of a power plant of at least 100 MVA producing electricity separately, which would fall within the time period 1 December - 28 February. The Energy Market Authority would be vested with the powers to postpone the outage due to a tight output situation, if there are not technical or safety- bound obstacles to this. It is important for the sufficiency of the power need of the Internal Market that the price signals of the market are reflected to both producers and consumers of electricity. The working group further proposes that the Ministry of Trade and Industry would look into development of the meter-reading requirements, so that they would, for their part, create the conditions for price flexibility in power consumption and for new sales products of electricity. In addition, tightening of the hourly metering requirement related to the

  3. Proliferation resistance and physical protection working group: methodology and applications

    International Nuclear Information System (INIS)

    Bari, Robert A.; Whitlock, Jeremy J.; Therios, Ike U.; Peterson, P.F.

    2012-01-01

    We summarize the technical progress and accomplishments on the evaluation methodology for proliferation resistance and physical protection (PR and PP) of Generation IV nuclear energy systems. We intend the results of the evaluations performed with the methodology for three types of users: system designers, program policy makers, and external stakeholders. The PR and PP Working Group developed the methodology through a series of demonstration and case studies. Over the past few years various national and international groups have applied the methodology to nuclear energy system designs as well as to developing approaches to advanced safeguards.

  4. PROLIFERATION RESISTANCE AND PHYSICAL PROTECTION WORKING GROUP: METHODOLOGY AND APPLICATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Bari R. A.; Whitlock, J.; Therios, I.U.; Peterson, P.F.

    2012-11-14

    We summarize the technical progress and accomplishments on the evaluation methodology for proliferation resistance and physical protection (PR and PP) of Generation IV nuclear energy systems. We intend the results of the evaluations performed with the methodology for three types of users: system designers, program policy makers, and external stakeholders. The PR and PP Working Group developed the methodology through a series of demonstration and case studies. Over the past few years various national and international groups have applied the methodology to nuclear energy system designs as well as to developing approaches to advanced safeguards.

  5. Interim report on research and development of super heat pump energy accumulation system by the evaluation working group; Super heat pump energy shuseki system hyoka work group chukan hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    The evaluation working group of the Large-scale Energy-saving Technology Research and Development Promotion Council has made an interim evaluation of the results obtained so far by the R and D project for the super heat pump energy accumulation systems. The working group evaluates the bench plant operation test results comprehensively, covering technical, economic and social aspects, and R and D promotion methodology. The working group has concluded that a significant technological break-through is made for the super high performance compression heat pumps, and the technological groundwork is now established for the future pilot system. For the chemical heat storage technologies, it is concluded that system feasibility is demonstrated, and the technological groundwork for the future development is established. The super heat pump is evaluated to potentially realize significant economic superiority over the conventional devices both in the domestic and industrial areas, and to be highly rated potentially in the areas of energy-saving, power load leveling and environmental preservation. (NEDO)

  6. 78 FR 67132 - GPS Satellite Simulator Control Working Group Meeting

    Science.gov (United States)

    2013-11-08

    ... DEPARTMENT OF DEFENSE Department of the Air Force GPS Satellite Simulator Control Working Group... simulator manufacturers, who supply products to the Department of Defense (DoD), and GPS simulator users..., and email address) to [email protected]us.af.mil and have your security personnel submit your VAR...

  7. International Consultation and Training on Group Work in South Asia

    Science.gov (United States)

    Ibrahim, Farah A.

    2015-01-01

    This article presents a consultation and training for faculty and graduate students in South Asia under the auspices of the United Nations' Transfer of Knowledge Through Expatriate Nationals (TOKTEN) Program. It describes the development of a consultation relationship and training on group work. Needs assessments focusing on both cultural…

  8. IEA SHC Task 42/ECES Annex 29–Working Group B

    DEFF Research Database (Denmark)

    van Helden, Wim; Yamaha, Motoi; Rathgeber, Christoph

    2016-01-01

    The IEA joint Task 42 / Annex 29 is aimed at developing compact thermal energy storage materials and systems. In Working Group B, experts are working on the development of compact thermal energy storage applications, in the areas cooling, domestic heating and hot water and industry. The majority...... challenges like the occurrence of non-condensable gases and thermo-mechanical effects and that standardized and simplified system approaches are needed....

  9. Designing for informed group formation

    DEFF Research Database (Denmark)

    Nicolajsen, Hanne Westh; Juel Jacobsen, Alice; Riis, Marianne

    2012-01-01

    A new design ―project preparation‖ preparing for the group formation in problem based project work is proposed and investigated. The main problem is to overcome group formation based on existing relations. The hypothesis is that theme development and group formation are somewhat counterproductive....... Following research based design methodology an experiment separating the two was initiated.This was to provide for more openness and creativity in contrast to a design in which existing relations seem predominant....

  10. 40 CFR Table 38 to Subpart Uuu of... - Initial Compliance With Work Practice Standards for HAP Emissions From Bypass Lines

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Initial Compliance With Work Practice... Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 38 Table 38 to Subpart UUU of Part 63—Initial Compliance With Work...

  11. Working group report on water resources, supply and demand

    International Nuclear Information System (INIS)

    Marta, T.J.

    1990-01-01

    A summary is presented of the issues discussed, and the conclusions and recommendations of a working group on water resources, supply and demand. The issues were grouped into the categories of detecting climatic change and water impacts, simulating potential impacts, and responding to potential impacts. The workshop groups achieved consensus on the following points: the physics of global warming and climatic change have been satifactorily proven; there appears to be some evidence of climatic change and a signal could soon be detected; policy decisions and strategic plans for climatic change and its potential impacts are needed immediately; and targets and priorities for decison making should be identified and addressed immediately. Three top-priority issues are the identification of indicators for the detection of climatic change impacts on hydrology, determining response to climate-related change, and evaluation of design criteria. Better information on regional climate and hydrology under conditions of global warming is needed before design criteria could be altered

  12. Recession and Work-Life Balance Initiatives

    OpenAIRE

    Pranav Naithani

    2010-01-01

    Over the last six decades work-life balance emerged as an important human resource management aspect for employers. Globally, a wide gamut of work-life balance facilities is being provided by a large number of organisations. The recent economic downturn has witnessed a sudden interruption in the spread and growth of work-life balance facilities at the organisational level. This paper presents the key recessionary reasons which have negatively influenced employee work-life balance. Further, im...

  13. The AAS Working Group on Accessibility and Disability (WGAD)

    Science.gov (United States)

    Monkiewicz, Jacqueline A.; Shanahan, J.; Murphy, Nicholas Arnold; Gilbert, Lauren

    2016-06-01

    The Working Group on Accessibility and Disability (WGAD) was formed by the Council of the American Astronomical Society in late 2015 in order to monitor and addresses issues of inclusivity in the astronomical community related to disability. WGAD promotes of the principles of universal accessibility and disability justice in both professional astronomy and astronomy education. The short term goals of WGAD for the next two years include producing a set of guidelines for a wide range of activities including supporting improved access to journals, data, and conferences. We will provide information and training regarding universal design as a guiding principle. The longer term goals of WGAD include integrating universal design as primary design strategy across the board in our many aspects of daily work life.

  14. Report of the Working Group on low-temperature neutron irradiation

    International Nuclear Information System (INIS)

    1982-07-01

    This report summarizes deliberations at a Working Group meeting sponsored by the Department of Energy, Division of Materials Sciences for the purpose of: (1) assessing the need for maintaining a low temperature neutron irradiation program in the United States; and (2) recommending a course of action based on this assessment

  15. The initiative on Model Organism Proteomes (iMOP) Session

    DEFF Research Database (Denmark)

    Schrimpf, Sabine P; Mering, Christian von; Bendixen, Emøke

    2012-01-01

    iMOP – the Initiative on Model Organism Proteomes – was accepted as a new HUPO initiative at the Ninth HUPO meeting in Sydney in 2010. A goal of iMOP is to integrate research groups working on a great diversity of species into a model organism community. At the Tenth HUPO meeting in Geneva...

  16. Scientific expertise from the inside: AFSSET Working Group on Radio-frequencies (2008-2009)

    International Nuclear Information System (INIS)

    Barthe, Yannick

    2014-01-01

    Although there is now a large amount of social science research on scientific expertise and expert groups, direct evidence by sociologists who themselves participated in scientific expert groups assessing controversial topics remain rare. This paper offers just this type of feedback. The aim is to analyse the production of scientific expert opinions based on personal experience: the author's participation as a sociologist in an expert committee set up by the former French Agency for the Safety of Health, the Environment and Work (AFSSET) on the topic of radio-frequencies. Several problematic aspects of these groups will thus be discussed from this concrete experience: the problem of the composition of the expert group, the issue of conflicts of interest, the organisation of the work within the group, the effects of the presence of an observer from an association, and the differences between performing scientific research and providing scientific expert opinions. (authors)

  17. Working group 1A - basis for the standard-safety

    International Nuclear Information System (INIS)

    Whipple, C.

    1993-01-01

    This paper presents a summary of the progress made by working group 1A (Basis for the Safety Standard) during the Electric Power Research Institute's EPRI Workshop on the technical basis of EPA HLW Disposal Criteria, March 1993. This group discussed the semantics of terms within the standard 40 CFR Part 191, the implementation of this standard, the advanced notice of rulemaking, the issue of emitting carbon-14 through a gaseous pathway, the strategy of dealing with standards for contamination of drinking water and groundwater, the 100,000 year time frame, and the analysis of specific comments. The specific comments dealt with the cost effectiveness of the standard, the dose histogram for populations and individuals, groundwater definition and the underlying technology driver for this standard

  18. Automated work packages architecture: An initial set of human factors and instrumentation and controls requirements

    Energy Technology Data Exchange (ETDEWEB)

    Agarwal, Vivek [Idaho National Lab. (INL), Idaho Falls, ID (United States); Oxstrand, Johanna H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Le Blanc, Katya L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The work management process in current fleets of national nuclear power plants is so highly dependent on large technical staffs and quality of work instruction, i.e., paper-based, that this puts nuclear energy at somewhat of a long-term economic disadvantage and increase the possibility of human errors. Technologies like mobile portable devices and computer-based procedures can play a key role in improving the plant work management process, thereby increasing productivity and decreasing cost. Automated work packages are a fundamentally an enabling technology for improving worker productivity and human performance in nuclear power plants work activities because virtually every plant work activity is accomplished using some form of a work package. As part of this year’s research effort, automated work packages architecture is identified and an initial set of requirements identified, that are essential and necessary for implementation of automated work packages in nuclear power plants.

  19. Radical Initiated Hydrosilylation on Silicon Nanocrystal Surfaces: An Evaluation of Functional Group Tolerance and Mechanistic Study.

    Science.gov (United States)

    Yang, Zhenyu; Gonzalez, Christina M; Purkait, Tapas K; Iqbal, Muhammad; Meldrum, Al; Veinot, Jonathan G C

    2015-09-29

    Hydrosilylation is among the most common methods used for modifying silicon surface chemistry. It provides a wide range of surface functionalities and effective passivation of surface sites. Herein, we report a systematic study of radical initiated hydrosilylation of silicon nanocrystal (SiNC) surfaces using two common radical initiators (i.e., 2,2'-azobis(2-methylpropionitrile) and benzoyl peroxide). Compared to other widely applied hydrosilylation methods (e.g., thermal, photochemical, and catalytic), the radical initiator based approach is particle size independent, requires comparatively low reaction temperatures, and yields monolayer surface passivation after short reaction times. The effects of differing functional groups (i.e., alkene, alkyne, carboxylic acid, and ester) on the radical initiated hydrosilylation are also explored. The results indicate functionalization occurs and results in the formation of monolayer passivated surfaces.

  20. ACPSEM ROSG TBE working group recommendations for quality assurance in total body electron irradiation

    International Nuclear Information System (INIS)

    Nelligan, Raelene; Baldwin, Zoe; Ostwald, Trish; Tran, Thi; Bailey, Michael

    2015-01-01

    The Australasian College of Physical Scientists and Engineers in Medicine (ACPSEM) Radiation Oncology Specialty Group (ROSG) formed a series of working groups in 2011 to develop recommendations for guidance of radiation oncology medical physics practice within the Australasian setting. These recommendations are intended to provide guidance for safe work practices and a suitable level of quality control without detailed work instructions. It is the responsibility of the medical physicist to ensure that locally available equipment and procedures are sufficiently sensitive to establish compliance to these recommendations. The recommendations are endorsed by the ROSG, and have been subject to independent expert reviews. For the Australian readers, these recommendations should be read in conjunction with the Tripartite Radiation Oncology Reform Implementation Committee Quality Working Group: Radiation Oncology Practice Standards (2011), and Radiation Oncology Practice Standards Supplementary Guide (2011). This publication presents the recommendations of the ACPSEM ROSG Total Body Electron Irradiation Working Group and has been developed in alignment with other international associations. However, these recommendations should be read in conjunction with relevant national, state or territory legislation and local requirements, which take precedence over the ACPSEM recommendations. It is hoped that the users of this and other ACPSEM recommendations will contribute to the development of future versions through the Radiation Oncology Specialty Group of the ACPSEM. This document serves as a guideline for calibration and quality assurance of equipment used for TBE in Australasia.