WorldWideScience

Sample records for work plan addendum

  1. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    Science.gov (United States)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of the NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. The addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted in Section 2.6 of "Air Quality Decision Support Tools, Partner Plans, Working Groups, Committees".

  2. Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

  3. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

  4. Work Plan, Galena Airport and Kalakaket Radio Relay Station, Alaska. Addendum

    Science.gov (United States)

    1994-09-08

    Fire Protection as outlined in the Scope of Work dated 18 July Training Area (FPTA), assess the impact of pesticide use 1994, on surface soils across...report is based on a suhaurface explotation plan designed to consider a unique sot of prqectrqpecifc ficsors Depending an the pwtect, theise way include...neessary MOST GEDIECWKJICAL RECOMMWENJDtTIONS ARE PROFESSIONAL JUDGM[EMM Site explotation and fatin identifies actual surface sad suhmzr*ice conditions

  5. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  6. Addendum to Revision 1 of the Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Addendum Revision No. 1)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2001-06-06

    This document is submitted as an addendum to the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit (CAU) 98: Frenchman Flat, Nevada Test Site (NTS), Nevada. The addendum was prepared to propose work activities in response to comments resulting from the U.S. Department of Energy's (DOE's) review of the draft Frenchman Flat CAU model of groundwater flow and contaminant transport completed in April 1999. The reviewers included an external panel of experts and the Nevada Division of Environmental Protection. As a result of the review, additional work scope, including new data-collection and modeling activities, has been identified for the Frenchman Flat CAU. The proposed work scope described in this addendum will be conducted in accordance with the revised Underground Test Area strategy contained in the December 2000 amendment to the Federal Facility Agreement and Consent Order. The Frenchman Flat CAU model is a group of interdependent models designed to predict the extent of contamination in groundwater due to the underground nuclear tests conducted within this CAU. At the time of the DOE review, the CAU model consisted of a CAU groundwater flow and transport model comprised of two major components: a groundwater flow model and a recharge model. The CAU groundwater flow model is supported by a hydrostratigraphic model and a recharge model, whereas the CAU transport model is supported by a source-term model. As part of the modeling activities proposed in this addendum, two new major components may be added to the Frenchman Flat CAU model: a total-system model and two local groundwater flow and transport models. The reviewers identified several issues relating to insufficiency of data and inadequacy of the modeling process that should be addressed to provide additional confidence in the modeling results with respect to the potential for contaminant migration to the Lower Carbonate Aquifer. The proposed additional work scope includes new

  7. 76 FR 53942 - Notice of Lodging of First Addendum to Consent Decree Under the Emergency Planning and Community...

    Science.gov (United States)

    2011-08-30

    ... Notice of Lodging of First Addendum to Consent Decree Under the Emergency Planning and Community Right-To.... Environmental Protection Agency (``EPA'') under the Emergency Planning and Community Right-to-Know Act (EPCRA... proposed Consent Decree. Comments should be addressed to the Assistant Attorney General for the Environment...

  8. Addendum to environmental monitoring plan Nevada Test Site and support facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    This 1992 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/1 0630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1992 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  9. Addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado Wetlands Mitigation Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is an addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado, Wetlands Mitigation Report, dated July 1997. The purpose of this addendum is to: (1) modify how information on plant height and plant species criteria are presented; and (2) provide more detailed information regarding the evaluation of the bare ground criteria at the Camp Ketle site. The information in this addendum is provided at the request of the Bureau of Land Management to aid in future monitoring and evaluation of the wetland mitigation sites.

  10. Woodbridge research facility remedial investigation/feasibility study. Sampling and analysis plan vol 1: Field sampling plan vol II: Quality assurance project plan. Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Wisbeck, D.; Thompson, P.; Williams, T.; Ehlers, M.; Eliass, M.

    1996-09-01

    U.S. Army Woodbridge Research Facility (WRF) was used in the past as a major military communications center and a research and development laboratory where electromagnetic pulse energy was tested on military and other equipment. WRF is presently an inactive facility pursuant to the 1991 Base Realignment and Closure list. Past investigation activities indicate that polychlorinated biphenyl compounds (PCBs) are the primary chemicals of concern. This task calls for provision of the necessary staff and equipment to provide remedial investigation/feasibility study support for the USAEC BRAC Program investigation at WRF. This Sampling and Analysis Plan, Addendum 1, Field Sampling Plan presents the sample location and rationale for additional samples required to complete the RI/FS; and the Quality Assurance Project Plan presents any additional data quality objectives and proposed laboratory methods for chemical analysis of samples.

  11. Independent Peer Review of the MOVES Design and Emissions Analysis Plans, and Addendum

    Science.gov (United States)

    Southwest Research Institute (SwRI) prepared this report for a work assignment under the EPA contract “Testing and Analytical Support for Regulation of Motor Vehicles, Engines, Fuels, and Fuel Additives.”

  12. Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE's ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

  13. Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE`s ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

  14. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  15. Final Addendum to the Necedah National Wildlife Refuge Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Addendum is to clarify actions that will be taken under the selected alternative for the Fire Management Plan Environmental Assessment that was...

  16. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  17. Work plan : Comprehensive Conservation Plan : environmental assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this work plan is to ensure that the Arapaho NWR Refuge Manager and Region-6 staff agree on the direction for preparation of the CCP/EA for Arapaho...

  18. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  19. Reference Mission Version 3.0 Addendum to the Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team. Addendum; 3.0

    Science.gov (United States)

    Drake, Bret G. (Editor)

    1998-01-01

    This Addendum to the Mars Reference Mission was developed as a companion document to the NASA Special Publication 6107, "Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team." It summarizes changes and updates to the Mars Reference Missions that were developed by the Exploration Office since the final draft of SP 6107 was printed in early 1999. The Reference Mission is a tool used by the exploration community to compare and evaluate approaches to mission and system concepts that could be used for human missions to Mars. It is intended to identify and clarify system drivers, significant sources of cost, performance, risk, and schedule variation. Several alternative scenarios, employing different technical approaches to solving mission and technology challenges, are discussed in this Addendum. Comparing alternative approaches provides the basis for continual improvement to technology investment plan and a general understanding of future human missions to Mars. The Addendum represents a snapshot of work in progress in support of planning for future human exploration missions through May 1998.

  20. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  1. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  2. TWRS Systems Engineering Working Plan

    Energy Technology Data Exchange (ETDEWEB)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  3. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  4. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  5. Work Planning at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Robin Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-12-01

    Work planning at Sandia National Laboratories (SNL) is not carried out effectively and consistently across the Laboratories. The challenge is to communicate recommendations and an accompanying model related to how work is introduced, planned, and executed at SNL as it relates to work planning and control (WP&C) to facilitate improvements in implementation and drive maturation of the work planning process.

  6. Addendum to Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Bergeron, Marcel P.; Freeman, Eugene J.; Wurstner, Signe K.; Kincaid, Charles T.; Coony, Mike M.; Strenge, Dennis L.; Aaberg, Rosanne L.; Eslinger, Paul W.

    2001-09-28

    This report summarizes efforts to complete an addendum analysis to the first iteration of the Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site (Composite Analysis). This document describes the background and performance objectives of the Composite Analysis and this addendum analysis. The methods used, results, and conclusions for this Addendum analysis are summarized, and recommendations are made for work to be undertaken in anticipation of a second analysis.

  7. A Marketing Plan That Works

    Science.gov (United States)

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  8. Behavior Plan, Does It Work?

    Science.gov (United States)

    Gonzalez, Blanca M.; Brown, D.

    2015-01-01

    As educators, we are responsible for teaching academic skills. However, some students not only need to learn academic skills but they need behavior support, due to problematic behaviors that are happening in the school setting. In this article, we will learn more of what are the implications, requirements and best strategies for a behavior plan.…

  9. Missisquoi Bay Phosphorus Model Addendum

    Science.gov (United States)

    This technical memorandum provides results of an extended load reduction simulation. The memorandum serves as an addendum to the main Missisquoi Bay Phosphorus Mass Balance Model report prepared for the Lake Champlain Basin Program by LimnoTech in 2012

  10. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...

  11. WRAP process area development control work plan

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.L., Fluor Daniel Hanford

    1997-02-27

    This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

  12. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  13. Grøstl Addendum

    DEFF Research Database (Denmark)

    Gauravaram, Praveen; Knudsen, Lars R.; Matusiewicz, Krystian

    2009-01-01

    This document is an addendum to the submission document of Grøstl, which was selected for the second round of NIST’s SHA-3 competition [18]. We stress that we do not change the specification of Grøstl. In other words, Grøstl is defined exactly as specified in the original submission document [8]....

  14. FY 1987 current fiscal year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-12-01

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

  15. Demand Response Potential for California SubLAPs and Local Capacity Planning Areas: An Addendum to the 2025 California Demand Response Potential Study – Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Alstone, Peter [Humboldt State Univ., Arcata, CA (United States). Schatz Energy Research Center; Potter, Jennifer [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Piette, Mary Ann [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Schwartz, Peter [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Berger, Michael A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunn, Laurel N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, Sarah J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sohn, Michael D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Aghajanzadeh, Arian [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Stensson, Sofia [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Szinai, Julia [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-04-01

    The 2025 California Demand Response Potential Study Phase 2 Report1 was released on March 1, 2017, and described a range of pathways for Demand Response (DR) to support a clean, stable, and cost-effective electric grid for California. One of the Report’s key findings was that while there appears to be very low future value for untargeted DR Shed aimed at system-wide peak load conditions, there could be significant value for locally focused Shed resources. Although the dynamics of renewable capacity expansion have reduced the pressure to build new thermal generation in general, there are still transmission-constrained areas of the state where load growth needs to be managed with the addition of new local capacity, which could include DERs and/or DR. This Addendum to the Phase 2 Report presents a breakdown of the expected future “Local Shed” DR potential at a finer geographic resolution than what is available in the original report, with results summarized by SubLAP and Local Capacity Area (LCA).

  16. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  17. Strategic planning for social work marketing.

    Science.gov (United States)

    Genkins, M

    1985-01-01

    Diminishing governmental and philanthropic funding for human service programs mandate new approaches for developing sources of support. In order to ensure both survival and enhancement of programs, marketing techniques employed in the business sector with strategic planning seeking to define consumer-need and product-demand appear to be a current necessity for social work service administrators. The author discusses the theoretical background of such a task and suggests specific marketing modalities and strategies for application in nonprofit agency and institutional settings.

  18. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  19. Wyoming Basin Rapid Ecoregional Assessment: Work Plan

    Science.gov (United States)

    Carr, Natasha B.; Garman, Steven L.; Walters, Annika; Ray, Andrea; Melcher, Cynthia P.; Wesner, Jeff S.; O’Donnell, Michael S.; Sherrill, Kirk R.; Babel, Nils C.; Bowen, Zachary H.

    2013-01-01

    The overall goal of the Rapid Ecoregional Assessments (REAs) being conducted for the Bureau of Land Management (BLM) is to provide information that supports regional planning and analysis for the management of ecological resources. The REA provides an assessment of baseline ecological conditions, an evaluation of current risks from drivers of ecosystem change, and a predictive capacity for evaluating future risks. The REA also may be used for identifying priority areas for conservation or restoration and for assessing the cumulative effects of a variety of land uses. There are several components of the REAs. Management Questions, developed by the BLM and partners for the ecoregion, identify the information needed for addressing land-management responsibilities. Conservation Elements represent regionally significant aquatic and terrestrial species and communities that are to be conserved and (or) restored. The REA also will evaluate major drivers of ecosystem change (Change Agents) currently affecting or likely to affect the status of Conservation Elements. We selected 8 major biomes and 19 species or species assemblages to be included as Conservation Elements. We will address the four primary Change Agents—development, fire, invasive species, and climate change—required for the REA. The purpose of the work plan for the Wyoming Basin REA is to document the selection process for, and final list of, Management Questions, Conservation Elements, and Change Agents. The work plan also presents the overall assessment framework that will be used to assess the status of Conservation Elements and answer Management Questions.

  20. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  1. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Funding for transportation planning and unified planning... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.308 Funding for transportation planning and unified planning work programs. (a) Funds...

  2. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  3. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  4. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge will begin developing its Comprehensive Conservation Plan in fiscal year 2005. This Annual Habitat Work Planning report will summarize accomplishments for...

  5. Addendum to the MiniBooNE Run Plab. MinneBooNE Physics in 2006

    Energy Technology Data Exchange (ETDEWEB)

    Aguilar-Arevalo, A. A. [Univ. of Alabama, Tuscaloosa, AL (United States). et al.

    2004-11-02

    The primary physics goal of Mini BooNE is to confirm or rule out the LSND vμ→ve oscilliation observation with high significance. In the 2003 Run Plan document presented to the PAC, we outlined the need for 1 X 1021 protons on target (POT) to achieve this goal. In this document, we present an addendum to our run plan for fiscal year 2006 (FY2006).

  6. Formulation of consumables management models: Test plan for the mission planning processor working model

    Science.gov (United States)

    Connelly, L. C.

    1977-01-01

    The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

  7. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential...

  8. Addendum

    Indian Academy of Sciences (India)

    R. Narasimhan (Krishtel eMaging) 1461 1996 Oct 15 13:05:22

    It was brought to our attention that the paper mentioned above was almost identical in content to the paper entitled “Hyers–Ulam stability of some difference equations and its applications”, published by the same author in Dynamic Systems and Applications,. 11 (2002), 269–276. After verifying that this was indeed the case, ...

  9. Addendum

    Indian Academy of Sciences (India)

    R. Narasimhan (Krishtel eMaging) 1461 1996 Oct 15 13:05:22

    Stability estimates for h-p spectral element methods for general elliptic problems on curvilinear domains. Pravir Dutt and Satyendra Tomar (pp. 395–429). MS received 18 March 2002; revised 30 June 2003. 3. On Howard's conjecture in heterogeneous shear flow problem. R G Shandil and Jagjit Singh (pp. 451–456).

  10. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  11. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  12. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  13. Environmental education work force pipeline strategic plan

    Energy Technology Data Exchange (ETDEWEB)

    Ortega, S.U.; Jackson, E.R.

    1992-11-01

    This document describes an educational program designed to provide a pool of highly qualified administrative, technical, and managerial graduates that are familiar with the Hanford Site and business operations. The program is designed to provide work experience and mentoring to a culturally diverse student base which enhances affirmative employment goals. Short-term and long-term objectives of the program are outlined in the report, and current objectives are discussed in more detail. Goals to be completed by the year 2003 are aimed at defining the criteria necessary to establish partnerships between schools, community organizations, and human resources departments. Actions to be implemented includes providing instructors and equipment, enhancing skills of local teachers, and establishing collaboration with human resources organizations. Long-term goals of the program are to ensure a constant supply of qualified, trained workers to support industry missions. 6 refs., 1 tab.

  14. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Science.gov (United States)

    2012-08-08

    ... From the Federal Register Online via the Government Publishing Office DENALI COMMISSION Fiscal..., concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal... Plan for Federal Fiscal Year 2012. The Commission will hold a public hearing via teleconference on the...

  15. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a plan that outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience. Wetland objectives...

  16. Kulm Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Kulm...

  17. TSCA Work Plan Chemical Risk Assessment: 1 ...

    Science.gov (United States)

    1-Bromopropane (CASRN 106-94-5): or 1-BP is a volatile organic chemical that is considered moderately persistent in the environment but does not have the potential to bioaccumulate in fish or other animals. The majority of the 1-BP production volume (~ 47%) is used as a vapor degreaser for optics electronics, plastics, and metals. 1-BP also is used as an aerosol solvent in cleaning products, as a spray fixative in arts and crafts, and as a spot cleaner in various industrial/commercial/consumer sectors. Focus of the Risk Assessment: The assessment will focus on uses of 1-BP in commercial (i.e., vapor degreasing, spray adhesives, and dry cleaning) and consumer applications (i.e., aerosol solvent cleaners and spray adhesives). Given the range of endpoints (i.e., cancer, non-cancer; the latter includes potential effects on the developing fetus), susceptible populations are expected to include adults (including pregnant women) in commercial uses and children (as bystanders) and adults of all ages (including pregnant women) for consumer uses. Thus, the assessment will focus on all humans/lifestages. EPA anticipates issuing draft risk assessments for public review and comment as they are completed. At the conclusion of the review process, if an assessment of specific uses indicates significant risk, EPA will evaluate and pursue appropriate risk reduction actions, as warranted. If an assessment indicates no significant risk, EPA will conclude its work on the a

  18. Public Works Center Pearl Harbor Fleet Moorings Underwater Inspection Plan.

    Science.gov (United States)

    1983-04-15

    AOA17 6 228 PUBLIC MORKS CENTER PERL HARBO FLEET MOORINGS 1/1 UNDERWATER INSPECTION PLAN(O) NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON DC...PUBLIC WORKS .......... CENTER.... ..... PEARL HARBOR.... 00~ D...... CENRWTTE E 4PAR INSPCTIO voOEA ENGINEEORINS *...... AND.. COSTUCIN.ROET.FFC...Public Works Center Pearl Habor F’aet Moorings Underwater Inspection Plan 12. PERSONAL AUTHOR(S) 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF

  19. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  20. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  1. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation......The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...

  2. Final work plan : groundwater monitoring at Morrill, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  3. Sandia SWiFT Site Safe Work Planning Manual.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jonathan

    2016-02-01

    The Department of Energy's Scaled Wind Farm Technology (SWiFT) facility provides research site with multiple wind turbines at a scale useful for the experimental study of wake dynamics, advanced rotor development, turbine control, and advanced sensing for production-scale wind farms. Safety of workers and the public is the top and overriding priority at SWiFT. Central to safe operations are formal planning processes . This manual provides an overview of test planning and work planning processes and requirements in adherence with the Sandia corporate Engineered Safety Work Planning and Control process. It is required reading for all SWiFT site staff, Sandia workers, and collaborators who oversee, conduct, or participate in test activities or who are involved in modifying Sandia SWiFT site assets.

  4. Advance care planning in South Korea: Social work perspective.

    Science.gov (United States)

    Kwon, Sung Ae; Kolomer, Stacey

    2016-08-01

    As ethical issues arise concerning the continuation of futile medical treatment for dying patients in Korean society, advance directive planning initiatives have been put into place to guide practice. This article describes the awareness and attitudes of social workers in Korea regarding advance care planning and related factors. A total of 246 gerontological/geriatric social workers completed a mailed or in-person survey regarding awareness and attitudes toward advance care planning. Seventy-three percent (n = 180) of the participants reported no knowledge of advance directives. Social workers who emphasized self-determination as a professional value, professed a preference for hospice care, and who were comfortable discussing death were more likely to have a positive attitudes toward advance care planning. This study reinforces the need for the infusion of advance care planning and end-of-life training in social work education in Korea.

  5. 48 CFR 1352.239-70 - Software license addendum.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Software license addendum... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License...-125, Prompt Payment. (g) Patent and Copyright Infringement: Patent or copyright infringement suits...

  6. Corrective measures evaluation work plan : Tijeras Arroyo Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Wymore, Ryan A.; Collins, Sue S.; Skelly, Michael Francis; Koelsch, Michael C.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories Tijeras Arroyo Groundwater (TAG). The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for TAG. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  7. Dictionary of minor planet names addendum to 6th edition 2012-2014

    CERN Document Server

    Schmadel, Lutz D

    2015-01-01

    The quantity of numbered minor planets is now approaching half a million. Together with this Addendum, the sixth edition of the Dictionary of Minor Planet Names, which is the IAU's official reference for the field, now covers more than 19,000 named minor planets. In addition to being of practical value for identification purposes, the Dictionary of Minor Planet Names provides authoritative information about the basis for the rich and colorful variety of ingenious names, from heavenly goddesses to artists, from scientists to Nobel laureates, from historical or political figures to ordinary women and men, from mountains to buildings, as well as a variety of compound terms and curiosities. This Addendum to the 6th edition of the Dictionary of Minor Planet Names adds approximately 2200 entries. It also contains many corrections, revisions and updates to the entries published in earlier editions. This work is an abundant source of information for anyone interested in minor planets and who enjoys reading about the ...

  8. Environmental Assessment Revised Hunting Plan Erie National Wildlife Refuge 1987

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 1984 a serious review of the existing plans led to a decision to completely post the boundary and make the necessary revisions/addendums to the hunting plan that...

  9. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    Energy Technology Data Exchange (ETDEWEB)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  10. PLANNING THE WORK OF AVIATION UNITS USING PROJECT MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Dmitry Valerievich Bogomolov

    2017-01-01

    Full Text Available The article deals with the problematic issues of planning the work of aviation units and offers one of the possible variants of their solutions by means of project management tools implementation in aviation units.As a key concept in the theory of planning, the author proposes introducing the concept of a project as a complex, non-repeating one-time action, limited in time, budget, resources and in clear guidance throughout the process, followingthe customer requirements. In aviation engineering service work, this also includes such works as operational preparationstypes, routine maintenance, aviation technology improvements, military repair etc.The use of network models can also easily specify the sequence of some of the actions (events, to make process flow charts and organizational charts.The main advantage of linear graphs is their clarity and simplicity. Linear graphs make it possible to optimize the work on a variety of criteria, including the equability of labor force, machinery, building materials, etc. At the same time,the main drawback of linear graphs is that they are difficult to correct in case of non-compliance with the deadlines or a change in their arrangement. These drawbacks are eliminated by a different form of scheduling - network charts.The scheme of planning the work of units using project management tools is given. To carry out the scheme theauthor proposes to use modern tools of project management, which allow to structure the process of maintenance activities through its decomposition into phases, tasks and subtasks, then to identify critical path tasks, construct the chart of imple- mentation. The process model as a project allows to make the prognostic analysis and to improve the process according to it, for what a number of modern software packages that automate the functions of planning and planned types of work schedule control.

  11. Modelling the construction projects using plans of work

    OpenAIRE

    Hughes, Will

    1991-01-01

    An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages,...

  12. 7 CFR 23.6 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... prepared. The Plan of Work should include: (1) Identification of major problems and needs which can be met by each related extension and research program in the geographic or problem area. (2) The... statement should contain the following elements: Title, objectives, organization and operational procedures...

  13. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  14. Final work plan for targeted sampling at Webber, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  15. [Recently graduated dentists: working situation and future plans].

    Science.gov (United States)

    van Dam, B A F M; den Boer, J C L; Bruers, J J M

    2009-09-01

    The Dutch Dental Association (NMT) surveyed dentists who graduated in 2004, 2005 or 2006 concerning their work situation and plans for the future. They were also asked about their experiences at the start of their career In general, the recently graduated dentists did not face difficulties at the start of their professional life. Most dentists worked in the practice of a colleague, but the majority ultimately wanted to have their own practice. The latter applied more to men than women. Furthermore, there was a clear preference for working within a team and most of them planned to specialize in a specific branch of dentistry. The survey also revealed that the delegation of tasks to dental hygienists and prevention assistants was more or less taken for granted by recently graduated dentists.

  16. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  17. Social work involvement in end of life planning.

    Science.gov (United States)

    Heyman, Janna C; Gutheil, Irene A

    2006-01-01

    This cross sectional study examined the factors associated with social workers' involvement in end-of-life (EOL) planning using a random sample of NASW members in health and aging. Of the 390 social workers who worked in EOL planning, the majority were involved in health care proxy discussions and counseling with patients. Respondents tended to see barriers to proxy completion as client-related. However, some system barriers were correlated with overall involvement. Factors that predicted social workers' involvement with the health care proxy included age, attitudes, perceptions of barriers, and perceived physician support. Social workers need to attend to the systems in which they operate as well as to client concerns.

  18. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  19. Reforming the American Military Officer Personnel System: Addendum: Thoughts on Contractors

    Science.gov (United States)

    2016-05-24

    Testimony Reforming the American Military Officer Personnel System Addendum: Thoughts on Contractors Bernard D. Rostker CT-446/1 Document...1 Reforming the American Military Officer Personnel System Addendum: Thoughts on Contractors Testimony of Bernard D. Rostker 1 The RAND

  20. PAT-1 safety analysis report addendum.

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Ruth F.; Schmale, David T.; Kalan, Robert J.; Akin, Lili A.; Miller, David Russell; Knorovsky, Gerald Albert; Yoshimura, Richard Hiroyuki; Lopez, Carlos; Harding, David Cameron; Jones, Perry L.; Morrow, Charles W.

    2010-09-01

    The Plutonium Air Transportable Package, Model PAT-1, is certified under Title 10, Code of Federal Regulations Part 71 by the U.S. Nuclear Regulatory Commission (NRC) per Certificate of Compliance (CoC) USA/0361B(U)F-96 (currently Revision 9). The purpose of this SAR Addendum is to incorporate plutonium (Pu) metal as a new payload for the PAT-1 package. The Pu metal is packed in an inner container (designated the T-Ampoule) that replaces the PC-1 inner container. The documentation and results from analysis contained in this addendum demonstrate that the replacement of the PC-1 and associated packaging material with the T-Ampoule and associated packaging with the addition of the plutonium metal content are not significant with respect to the design, operating characteristics, or safe performance of the containment system and prevention of criticality when the package is subjected to the tests specified in 10 CFR 71.71, 71.73 and 71.74.

  1. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  2. [Promoting family planning work in Xiaqidu township by establishing a family planning association in each village].

    Science.gov (United States)

    Li, C

    1987-07-01

    A family planning association was established in each village of Xiaqidu Township in Hunan Province, China in October 1986. The positive functions of each such association were so fully developed that family planning work reached new levels. For example, most villages are no longer experiencing early marriages or unplanned births. Some of the villages have established associations for individual work groups. The traditional method was for both township and village associations to rely upon the positive attitudes of officials to instill into fertile women Party policy, and to arouse their patriotism and initiative. By establishing family planning associations at the village level, however, the people can conduct their own affairs and educate themselves. Emphasis has been placed on attracting into the associations those who are of childbearing age, as well as older villagers of experience. The associations' raison d'etre was to serve the people. They did so through: propaganda (disseminating population theory, birth control and family planning information); helping the people overcome poverty, traditional thinking, and ignorance; assisting women with any problems and anxieties relating to child-bearing; delivering contraceptives to households; and providing the elderly with care and the young with education.

  3. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  4. ARIADNE: Beam Time and Resources Request - Addendum

    CERN Document Server

    Hollywood, D; Mavrokoridis, K; McCormick, KJ; Philippou, B; Roberts, A; Stavrakis, G; Touramanis, C; Vann, J

    2017-01-01

    This addendum provides additional information and clarification requested by the SPS Committee in response to our previously submitted Beam Time Request (CERN-SPSC-2017-031 [SPSC-P-356]). The ARIADNE research programme is based around developing an optical readout system for use in LAr TPC detectors, which could potentially have a number of benefits over the currently used segmented anode planes - particularly in matters of scalability for future kilo-tonne scale detectors, ease of installation, use and maintenance, and reconstruction resolution. As detailed in our previously submitted Letter of Intent (CERN-SPSC-2016-008 [SPSC-I-244]), ARIADNE itself is a 1-tonne, two-phase LAr TPC detector, designed and built at the University of Liverpool, which uses an array of EMCCD cameras as its optical readout system, alongside PMTs for scintillation light observation and a segmented THGEM for charge readout.

  5. Systems engineering functions and requirements for the Hanford cleanup mission. First issue, Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, J.J.

    1994-01-01

    This addendum provides the technical detail of a systems engineering functional analysis for the Hanford cleanup mission. Details of the mission analysis including mission statement, scope, problem statement, initial state definition, and final state definition are provided in the parent document. The functional analysis consists of Input Computer Automated Manufacturing Definition (IDEFO) diagrams an definitions, which will be understood by systems engineers, but which may be difficult for others to comprehend. For a more complete explanation of this work, refer to the parent document. The analysis covers the total Hanford cleanup mission including the decomposition levels at which the various Hanford programs or integrated activities are encountered.

  6. Technical Work Plan for: Thermodynamic Database for Chemical Modeling

    Energy Technology Data Exchange (ETDEWEB)

    C.F. Jovecolon

    2006-09-07

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species.

  7. Interim measure work plan/design for Agra, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  8. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  9. Addendum to Sampling and Analysis Plan (SAP) for Assessment of LANL-Derived Residual Radionuclides in Soils within Tract A-16-d for Land Conveyance and Transfer for Sewage Treatment Facility Area

    Energy Technology Data Exchange (ETDEWEB)

    Whicker, Jeffrey Jay [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gillis, Jessica Mcdonnel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-21

    This report summarizes the sampling design used, associated statistical assumptions, as well as general guidelines for conducting post-sampling data analysis. Sampling plan components presented here include how many sampling locations to choose and where within the sampling area to collect those samples. The type of medium to sample (i.e., soil, groundwater, etc.) and how to analyze the samples (in-situ, fixed laboratory, etc.) are addressed in other sections of the sampling plan.

  10. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  11. Final work plan for targeted investigation at Hilton, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  12. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    Science.gov (United States)

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  13. Annual Habitat Work Plan Seatuck National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines management activities that include forest protection, grassland management, wetland restoration, wildlife nesting structures, invasive vegetation...

  14. Cognitive Works Aids for C2 Planning: Actionable Information to Support Operational Decision Making

    National Research Council Canada - National Science Library

    Wampler, Jeffrey; Whitaker, Randall; Roth, Emilie; Scott, Ronald; Stilson, Mona; Thomas-Meyers, Gina

    2005-01-01

    .... This paper describes a design for a global mission planning C2 work aid. The discussion describes a cognitive based design approach to developing work aids called Work Centered Support Systems (WCSS...

  15. Final work plan for targeted investigation at Inman, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-11-05

    In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

  16. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  17. White House Conference on Families: Summary of State Reports. Addendum.

    Science.gov (United States)

    White House Conference on Families, Washington, DC.

    Prepared as an address to the White House Conference on Families, this addendum includes state by state summaries of recommendations for solving some of the key problems facing American families today. Included are recommendations from the following states: Massachusetts, Mississippi, New Jersey, Nevada, New Mexico, North Dakota, Ohio, and…

  18. Annual Habitat Work Plan Conscience Point National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines the goals and objectives for management of the refuge’s grasslands and wetlands that includes the recovery effort for Sandplain Gerardia, the...

  19. Annual Habitat Work Plan Wertheim National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management activities outlined in this plan include forest protection, grassland management, and wetland restoration, wildlife nesting structures and restoring...

  20. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2014

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — AHWP describes the habitat and wildlife responses to management actions and weather conditions of 2013 and planned habitat management strategies, prescriptions and...

  1. Annual Habitat Work Plan Chincoteague National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan provides specific goals and objectives for how the refuge will manage its wetlands, beach, uplands, invasive species and artificial nesting.

  2. Habitat Work Plan 2005 Erie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report outlines the objectives for each of the management units at Erie National Wildlife Refuge in 2005. The plan describes the habitat objectives for each...

  3. Site Characterization Work Plan for Gasbuggy, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2000-12-14

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  4. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  5. 2016 System Summary of University Work Plans. Revised

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2016

    2016-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' 2025 System Strategic Plan is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is progressing…

  6. University of West Florida Work Plan, 2013-2014

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…

  7. Addendum to the Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-07-31

    This addendum to the Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, DOE/NV--1480, dated July 2012, documents repairs of erosion and construction of engineered erosion protection features at Corrective Action Site (CAS) 02-37-02 (MULLET) and CAS 09-99-06 (PLAYER). The final as-built drawings are included in Appendix A, and photographs of field work are included in Appendix B. Field work was completed on March 11, 2013.

  8. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  9. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  10. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  11. Firefighters’ Physical Activity across Multiple Shifts of Planned Burn Work

    Directory of Open Access Journals (Sweden)

    Stephanie E. Chappel

    2016-09-01

    Full Text Available Little is currently known about the physical activity patterns of workers in physically demanding populations. The aims of this study were to (a quantify firefighters’ physical activity and sedentary time within (2-h periods and across planned burn shifts; and (b examine whether firefighters’ activity levels during one shift or 2-h period was associated with their activity levels in the following shift or 2-h period. Thirty-four salaried firefighters (26 men, 8 women wore an Actical accelerometer for 28 consecutive days. Time spent sedentary (SED and in light- (LPA, moderate- (MPA and vigorous-intensity physical activity (VPA were derived using validated cut-points. Multilevel analyses (shift, participant were conducted using generalised linear latent and mixed models. Firefighters spent the majority of a planned burn shift (average length 10.4 h or 2-h period engaged in LPA (69% and 70%, respectively. No significant associations were observed between SED and physical activity levels between consecutive planned burned shifts or 2-h periods. The physical activity that a firefighter engaged in during one shift (or 2-h period did not subsequently affect their physical activity levels in the subsequent shift (or 2-h period. Further research is needed to establish how workers in physically demanding populations are able to sustain their activity levels over long periods of time.

  12. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Approval requirements for load forecast work plans... LOANS AND GUARANTEES Load Forecasts § 1710.209 Approval requirements for load forecast work plans. (a) In addition to the approved load forecast required under §§ 1710.202 and 1710.203, any power supply...

  13. Plans for Balancing Work and Family Life: Do Women Pursuing Nontraditional and Traditional Occupations Differ?

    Science.gov (United States)

    O'Connell, Lenahan; And Others

    1989-01-01

    The work-involvement plans of 173 women in traditional (nursing) and nontraditional (engineering and veterinary medicine) fields were found to be similar. Reviews the following approaches to the connection between work and gender: (1) occupational; (2) differential gender socialization; and (3) role conflict. Plans to pursue nontraditional…

  14. Work Planning and Performance Appraisal: A Reference Handbook for Managers and Supervisors.

    Science.gov (United States)

    Batten, Jerry E.

    Merit system law, state personnel rules, and collective bargaining contracts require that Oregon state agencies appraise the performance of their employees. The heart of the Oregon performance appraisal system is work planning. Based on management by objectives and the concepts of employee involvement and participation, work planning is a process…

  15. Information system planning work on maintenance metrological equipment

    Directory of Open Access Journals (Sweden)

    Dmitry V. Shtoller

    2011-05-01

    Full Text Available Computerization has entered into all human activities. Important role in the work now is a workstation, which increases productivity. Did not remain without attention and work of the metrological services of enterprises. Electronic records can help solve many problems for the organization of data.

  16. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  17. Class planning; a fundamental task in teaching work

    Directory of Open Access Journals (Sweden)

    Juan Reyes-Salvador

    2017-03-01

    Full Text Available The educational task presents great challenges and challenges in the search for a transformation in the integral formation of students. The present article points out some reflections regarding the importance of class planning as the essence and guiding axis in the scientific direction of the teaching-learning process. It is emphasized in its systemic character from integrating its different elements from the perspective of the didactic development. Thus, it is also analyzed from the author's experience the causes that give rise to the various limitations and inadequacies that obstruct the educational process in a systemic and creative way.

  18. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.

  19. Some Thoughts on Stability in Nonlinear Periodic Focusing Systems [Addendum

    Science.gov (United States)

    McMillan, Edwin M.

    1968-03-29

    Addendum to September 5, 1967 report with the same title and with the abstract: A brief discussion is given of the long-term stability of particle motions through periodic focusing structures containing lumped nonlinear elements. A method is presented whereby one can specify the nonlinear elements in such a way as to generate a variety of structures in which the motion has long-term stability.

  20. Addendum to Computational Complexity and Black Hole Horizons

    OpenAIRE

    Susskind, Leonard

    2014-01-01

    In this addendum to [arXiv:1402.5674] two points are discussed. In the first additional evidence is provided for a dual connection between the geometric length of an Einstein-Rosen bridge and the computational complexity of the quantum state of the dual CFT's. The relation between growth of complexity and Page's ``Extreme Cosmic Censorship" principle is also remarked on. The second point involves a gedanken experiment in which Alice measures a complete set of commuting observables at her end ...

  1. 77 FR 67635 - Fiscal Year 2013 Draft Work Plan

    Science.gov (United States)

    2012-11-13

    ... and focuses on bulk fuel facilities and rural power system upgrades/power generation (RPSU) across... has been working in partnership with the U.S. Army Corps of Engineers (USACE) since 2009 to complete... safe and efficient bulk delivery of community fuel that is used for heating and electric generation...

  2. Group Work and Outreach Plans for College Counselors

    Science.gov (United States)

    Fitch, Trey, Ed.; Marshall, Jennifer L., Ed.

    2011-01-01

    In this book, group work and college counseling leaders offer step-by-step instruction in the effective use and processing of structured group activities on topics such as test anxiety; stress and anxiety management; ADHD; career development; substance abuse; eating disorders; and the unique concerns faced by GLBT students, first-generation…

  3. The muddles of medicine: a practical, clinical addendum to the biopsychosocial model.

    Science.gov (United States)

    Freudenreich, Oliver; Kontos, Nicholas; Querques, John

    2010-01-01

    The commonly-accepted "biopsychosocial model" does not always lend itself to the kind of pragmatic decisions that many clinical situations demand of physicians. The authors attempt to identify and close gaps in the biopsychosocial model that hinder its application in certain real-life clinical situations. The authors review some of the current and historical literature on the development and application of the biopsychosocial model, and argue the shortcomings of this modality in various clinical situations. The authors present three dicta to guide clinicians toward relevant areas of inquiry: 1) Think neuroanatomically; 2) Think existentially; and 3) Think "dirty;" that is, understand that patients and physicians sometimes work toward different goals. These dicta form an addendum to the biopsychosocial model, identifying and filling three specific, commonly-encountered gaps in that paradigm, which, ironically, is usually considered all-inclusive.

  4. Forest Restoration Monitoring and Erosion Control Work Planning

    OpenAIRE

    HONDA, Kiyoshi; MURAI, Shunji; SHIBASAKI, Ryousuke

    1995-01-01

    [ABSTRACT] This paper describes the qualitative evaluation of forest destruction and erosion control work at Asio copper mine. The vegetation restoration process is grasped using remote sensing and GIS. This data is used to develop the vegetation restoration model.. The vegetation restoration process is expressed by a growth curve that is applied to the vegetation index. The sediment and flood discharge models are also developed which can use the result of the vegetation restoration model. Un...

  5. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  6. Usefulness and engagement with a guided workbook intervention (WorkPlan) to support work related goals among cancer survivors.

    Science.gov (United States)

    Schumacher, Lauren; Armaou, Maria; Rolf, Pauline; Sadhra, Steven; Sutton, Andrew John; Zarkar, Anjali; Grunfeld, Elizabeth A

    2017-10-04

    Returning to work after cancer is associated with improved physical and psychological functioning, but managing this return can be a challenging process. A workbook based intervention (WorkPlan) was developed to support return-to-work among cancer survivors. The aim of this study was to explore how participants using the workbook engaged with the intervention and utilised the content of the intervention in their plan to return-to-work. As part of a feasibility randomised controlled trial, 23 participants from the intervention group were interviewed 4-weeks post intervention. Interviews focussed on intervention delivery and data was analysed using Framework analysis. Participants revealed a sense of empowerment and changes in their outlook as they transitioned from patient to employee, citing the act of writing as a medium for creating their own return-to-work narrative. Participants found the generation of a return-to-work plan useful for identifying potential problems and solutions, which also served as a tool for aiding discussion with the employer on return-to-work. Additionally, participants reported feeling less uncertain and anxious about returning to work. Timing of the intervention in coordination with ongoing cancer treatments was crucial to perceived effectiveness; participants identified the sole or final treatment as the ideal time to receive the intervention. The self-guided workbook supports people diagnosed with cancer to build their communication and planning skills to successfully manage their return-to-work. Further research could examine how writing plays a role in this process. Current Controlled Trials ISRCTN56342476 . Retrospectively registered 14 October 2015.

  7. 78 FR 39763 - Recovery Plan Addendum; Thick-Billed Parrot

    Science.gov (United States)

    2013-07-02

    ...-sustaining members of their ecosystems is a primary goal of our endangered species program and the Act (16 U... deterioration of Mexican ecosystems and biodiversity. Thirty-five priority and endangered species were selected... predicting warmer, drier, and more drought-like conditions (Hoerling and Eischeid 2007; Seager et al. 2007...

  8. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  9. Collaborative for Historical Information and Analysis: Vision and Work Plan

    Directory of Open Access Journals (Sweden)

    Vladimir Zadorozhny

    2013-02-01

    Full Text Available This article conveys the vision of a world-historical dataset, constructed in order to provide data on human social affairs at the global level over the past several centuries. The construction of this dataset will allow the routine application of tools developed for analyzing “Big Data” to global, historical analysis. The work is conducted by the Collaborative for Historical Information and Analysis (CHIA. This association of groups at universities and research institutes in the U.S. and Europe includes five groups funded by the National Science Foundation for work to construct infrastructure for collecting and archiving data on a global level. The article identifies the elements of infrastructure-building, shows how they are connected, and sets the project in the context of previous and current efforts to build large-scale historical datasets. The project is developing a crowd-sourcing application for ingesting and documenting data, a broad and flexible archive, and a “data hoover” process to locate and gather historical datasets for inclusion. In addition, the article identifies four types of data and analytical questions to be explored through this data resource, addressing development, governance, social structure, and the interaction of social and natural variables.

  10. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  11. When Planning Results in Loss of Control: Intention-Based Reflexivity and Working-Memory

    Directory of Open Access Journals (Sweden)

    Nachshon eMeiran

    2012-05-01

    Full Text Available In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed intention-based reflexivity. The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand. When the plans are practiced, intention based reflexivity depends on the prior availability of response codes in long-term memory. When the plans are novel, reflexivity is observed when the plan is pending and the goal has not yet been achieved. Intention-based reflexivity also depends on the availability of working memory limited resources and the motivation to prepare. Reflexivity is probably related to the fact that, unlike reactive control (once a plan is prepared, proactive control tends to be relatively rigid.

  12. When planning results in loss of control: intention-based reflexivity and working-memory.

    Science.gov (United States)

    Meiran, Nachshon; Cole, Michael W; Braver, Todd S

    2012-01-01

    In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed "intention-based reflexivity." The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand). When the plans are practiced, intention-based reflexivity depends on the prior availability of response codes in long-term memory (LTM). When the plans are novel, reflexivity is observed when the plan is pending and the goal has not yet been achieved. Intention-based reflexivity also depends on the availability of working-memory (WM) limited resources and the motivation to prepare. Reflexivity is probably related to the fact that, unlike reactive control (once a plan is prepared), proactive control tends to be relatively rigid.

  13. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    Science.gov (United States)

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  14. Parental influence on work and family plans of adolescents of different ethnic backgrounds in the Netherlands

    NARCIS (Netherlands)

    de Valk, H.A.G.

    2008-01-01

    This paper examined the work and family plans of adolescents from five different ethnic origins. The way in which parents influence these plans was studied by using a representative sample of secondary school pupils (N = 52,000) in The Netherlands. Results showed that substantial proportions of

  15. Responses to Comments for N-Methylpyrrolidone (NMP) Work Plan Risk Assessment

    Science.gov (United States)

    This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for n-Methylpyrrolidone (NMP).

  16. Region 8 (Pacific Southwest Region) Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 8 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  17. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  18. National Wildlife Refuge System Region 4 Inventory and Monitoring Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 4 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  19. Evaluation of black-billed magpies as monitors of environmental contamination : Work plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Preliminary proposal and work plan for the project "Evaluation of Black-billed Magpies as Indicators of Environmental Contamination at the Rocky Mountain Arsenal"....

  20. Rocky Mountain Arsenal National Wildlife Refuge Complex : Calendar Year 2016 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Work Plan for the Rocky Mountain Arsenal National Wildlife Refuge Complex details in a bullet-format the complex's priorities, timeline, and budget for...

  1. Rocky Mountain Arsenal National Wildlife Refuge Complex : Calendar Year 2015 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Work Plan for the Rocky Mountain Arsenal National Wildlife Refuge Complex details in a bullet-format the complex's priorities, timeline, and budget for...

  2. Rocky Mountain Arsenal National Wildlife Refuge Complex : Calendar Year 2014 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Work Plan for the Rocky Mountain Arsenal National Wildlife Refuge Complex details in a bullet-format the complex's priorities, timeline, and budget for...

  3. Rocky Mountain Arsenal National Wildlife Refuge Complex : Calendar Year 2017 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Work Plan for the Rocky Mountain Arsenal National Wildlife Refuge Complex details in a bullet-format the complex's priorities, timeline, and budget for...

  4. 76 FR 14995 - Comment Request for Information Collection for Work-Flex Plan Submission and Reporting...

    Science.gov (United States)

    2011-03-18

    ... Request for Information Collection for Work-Flex Plan Submission and Reporting Requirements; Extension With Revisions AGENCY: Employment and Training Administration, DOL. ACTION: Notice. SUMMARY: The.... Currently, the Employment and Training Administration is soliciting comments concerning the collection of...

  5. Formulation of consumables management models. Development approach for the mission planning processor working model

    Science.gov (United States)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  6. Will a Quota Plan for Asylum Seekers Plan Work —and Why Not?

    DEFF Research Database (Denmark)

    Seeberg, Peter

    2015-01-01

    The article describes the recent situation in the Mediterranean, where the number of asylum seekers arriving from countries south and east of the Mediterranean Sea is increasing significantly. The European Commission has suggested a plan, “A European Agenda on Migration”, which will redistribute ...... later on lead to a common EU migra-tion policy, which are beyond national control and would make it difficult to avoid responsibilities for internal crisis situations emerging in other parts of the Middle East or North Africa in the future.......The article describes the recent situation in the Mediterranean, where the number of asylum seekers arriving from countries south and east of the Mediterranean Sea is increasing significantly. The European Commission has suggested a plan, “A European Agenda on Migration”, which will redistribute...... the migrants arriving mainly in Italy and Greece, so that all 28 EU member states will take their part of the responsibility. The plan should – according to the EU-Commission – be mandatory and this has resulted in criticism from several member states, not least the UK. The article claims that the idea from...

  7. RFI/RI work plan for the Road A Chemical Basin 904-111G

    Energy Technology Data Exchange (ETDEWEB)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  8. Addendum Guidelines for the Prevention of Peanut Allergy in the United States: Report of the National Institute of Allergy and Infectious Diseases-Sponsored Expert Panel.

    Science.gov (United States)

    Togias, Alkis; Cooper, Susan F; Acebal, Maria L; Assa'ad, Amal; Baker, James R; Beck, Lisa A; Block, Julie; Byrd-Bredbenner, Carol; Chan, Edmond S; Eichenfield, Lawrence F; Fleischer, David M; Fuchs, George J; Furuta, Glenn T; Greenhawt, Matthew J; Gupta, Ruchi S; Habich, Michele; Jones, Stacie M; Keaton, Kari; Muraro, Antonella; Plaut, Marshall; Rosenwasser, Lanny J; Rotrosen, Daniel; Sampson, Hugh A; Schneider, Lynda C; Sicherer, Scott H; Sidbury, Robert; Spergel, Jonathan; Stukus, David R; Venter, Carina; Boyce, Joshua A

    Food allergy is an important public health problem because it affects children and adults, can be severe and even life-threatening, and may be increasing in prevalence. Beginning in 2008, the National Institute of Allergy and Infectious Diseases, working with other organizations and advocacy groups, led the development of the first clinical guidelines for the diagnosis and management of food allergy. A recent landmark clinical trial and other emerging data suggest that peanut allergy can be prevented through introduction of peanut-containing foods beginning in infancy. Prompted by these findings, along with 25 professional organizations, federal agencies, and patient advocacy groups, the National Institute of Allergy and Infectious Diseases facilitated development of addendum guidelines to specifically address the prevention of peanut allergy. The addendum provides 3 separate guidelines for infants at various risk levels for the development of peanut allergy and is intended for use by a wide variety of health care providers. Topics addressed include the definition of risk categories, appropriate use of testing (specific IgE measurement, skin prick tests, and oral food challenges), and the timing and approaches for introduction of peanut-containing foods in the health care provider's office or at home. The addendum guidelines provide the background, rationale, and strength of evidence for each recommendation. Guidelines have been developed for early introduction of peanut-containing foods into the diets of infants at various risk levels for peanut allergy. Published by Elsevier Inc.

  9. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  10. Understanding work-related social media use: An extension of theory of planned behavior.

    NARCIS (Netherlands)

    van Zoonen, W.; Verhoeven, J.W.M.; Elving, W.J.L.

    2014-01-01

    This study examines the motives of employees to engage in work related social media use - i.e. the use of personal social media accounts to communicate about work-related issues. The theory of planned behavior (TPB) was used to explain this behavior. Because social media can enable users to express

  11. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    Pentecost, E.D.; Vinikour, W.S. [Argonne National Lab., IL (United States)

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  12. Draft Site Management and Monitoring Plan, Corpus Christi Site Management and Monitoring Plan for Maintenance and New Work Ocean Dredged Material Disposal Site

    Science.gov (United States)

    USEPA Region 6 and the US Army Corps of Engineers submit for comment this Draft Site Management and Monitoring Plan, Corpus Christi Site Management and Monitoring Plan for Maintenance and New Work Ocean Dredged Material Disposal Site

  13. Communication Platform Payload Definition (CPPD) study. Volume 3: Addendum

    Science.gov (United States)

    Hunter, E. M.; Driggers, T.; Jorasch, R.

    1986-01-01

    This is Volume 3 (Addendum) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study Program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

  14. Advanced reactors transition FY 1997 multi-year work plan WBS 7.3

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1996-09-27

    This document describes in detail the work to be accomplised in FY 1997 and the out-years for the Advanced Reactors Transition (WBS 7.3) under the management of the Babcock & Wilcox Hanford Company. This document also includes specific milestones and funding profiles. Based upon the Fiscal Year 1997 Multi-Year Work Plan, the Department of Energy will provide authorization to perform the work described.

  15. IGS Working Group "Regional Dense Velocity Fields": Objectives and Work Plan

    Science.gov (United States)

    Bruyninx, C.; Altamimi, Z.; Becker, M.; Craymer, M.; Combrinck, L.; Combrink, A.; Fernandes, R.; Govind, R.; Herring, T.; Kenyeres, A.; King, B.; Kreemer, C.; Lavallee, D.; Legrand, J.; Moore, M.; Sanchez, L.; Sella, G.; Woppelmann, G.

    2008-12-01

    The IAG Working Group (WG) on "Regional Dense Velocity Fields" was created within IAG sub-commission 1.3 "Regional Reference Frames" at the IUGG General Assembly in Perugia in 2007. The goal of the Working Group is to densify the latest realization of the ITRS and provide regional dense velocity information in a common global reference frame. For that purpose, working group members join efforts with the regional sub-commissions (AFREF, NAREF, SIRGAS, EUREF, ·s ) and analysis groups processing data from local/regional continuous and episodic GNSS stations. In a first step, dedicated region coordinators will gather as many as possible velocity solutions for their region (in accordance with the WG requirements) and combine these solutions with the sub-commission regional solutions to produce a regional cumulative combined solution in the SINEX format. In a second step, combination coordinators will perform combinations of the regional SINEX submissions and SINEX solutions from global GNSS networks like e.g. TIGA. The purpose of multiple combination coordinators is to evaluate both the results and different approaches. To assist in this task regional coordinators will solicit discontinuity tables in addition to the weekly SINEX solutions. At the same time, the WG will also study the strengths and shortcomings of local/regional and continuous/episodic GNSS solutions to determine site velocities, and define optimal strategies for the combination of regional and global SINEX solutions.

  16. SAFETY ANALYSIS REPORT FOR PACKAGING, MODEL 9977, ADDENDUM 3, JUSTIFICATION FOR SMALL GRAM QUANTITY CONTENTS

    Energy Technology Data Exchange (ETDEWEB)

    Abramczyk, G.

    2011-10-31

    This Addendum establishes a new family of content envelopes consisting of small quantities of radioactive materials. These content envelopes and specific packing configurations are shown to be subcritical. However, the dose rates of some payloads must be measured and shown to comply with applicable radiation limits. Authorization for shipment of the content envelop requires acceptance of this Addendum by the DOE-HQ certifying official as a supplement to the 9977 SARP Revision 2 and DOE-HQ's subsequent revision of the CoC Revision 10 (which is based on SARP Addendum 2 and SARP Addendum 4) to authorize the additional content envelope. The Small Gram Quantity Content Envelopes and packing configurations will be incorporated in the next revision of the 9977 SARP.

  17. Concrete samples for organic samples, data package and 222-S validation summary report. Addendum 1A

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, R.E.

    1994-11-01

    This document is in two parts: the first is the data package entitled ``Concrete Samples for Organic Samples`` and the second is entitled ``Concrete Samples for Organic Samples -- Addendum 1A`` which is the 222-S validation summary report.

  18. Corrective measures evaluation work plan : Technical Area V Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Lebow, Patrick S.; Dettmers, Dana L.; Hall, Kevin A.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories/New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  19. ARET update: addendum to environmental leaders 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    ARET (Accelerated Reduction/Elimination of Toxics) is a private-sector initiative whose objective is to reduce or eliminate toxic substance emissions through voluntary actions. In `Environmental leaders 1` achievements in emission reductions and eliminations to the end of 1993, and commitments for further reductions or eliminations from 1993 to the year 2000 were summarized. ARET Update contained a brief summary of new and revised action plans,and updates the results provided in `Environmental leaders 1`. Twenty-seven new action plans were filed with the ARET Secretariat. Collectively, the plans represent an additional commitment to reduce total emissions of ARET substances by 1,660 tonnes by the year 2000. Total reduction commitment by 270 ARET participants in December 1995 was 20,731 tonnes. 4 tabs., figs.

  20. A regionalized assessment of the influence of rural nonpoint source pollution on the ecological integrity of stream ecosystems and an evaluation of associated pollution control management : Proposal addendum

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is an addendum to a proposal to assess the influence of land form and land use practices in the generation of NPSP in Kansas, Nebraska, and Iowa. The addendum...

  1. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    Energy Technology Data Exchange (ETDEWEB)

    S. J. Nacht

    2000-02-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs.

  2. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  3. World coal trade up to the year 2010. The 1995 update. Statistical addendum

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, P.

    1995-04-25

    The statistical addendum to the main review document (Energy/WP.1/GE.2/R.21) contains data on consumption, production, imports and exports from coal-producing countries, covering the years 1980, 1990, 2000 and 2010. A separate addendum (Energy/WP.1/GE.2/R.21/Add.1) and corrigendum (Energy/WP.1/GE.2/R.21/Add.1/Corrr.1) have also been published. 11 tabs., 10 figs.

  4. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  5. Is the 2014 Office of Inspector General Work Plan keeping you up at night?

    Science.gov (United States)

    Schaum, Kathleen D

    2014-05-01

    Wound care providers should do everything possible to prevent becoming a target for OIG investigations, which will surely keep them up at night. The best way to get a good night’s sleep is to follow the most current coding, payment, coverage, and documentation regulations that pertain to your business. Then, consider the focus areas of the annual OIG Work Plan as “ a heads-up.” If you wish to read the entire 2014 OIG Work Plan, you can find it at http://www.oig.hhs.gov.

  6. The association between psychosocial work environment, attitudes towards older workers (ageism) and planned retirement.

    Science.gov (United States)

    Thorsen, Sannie; Rugulies, Reiner; Løngaard, Katja; Borg, Vilhelm; Thielen, Karsten; Bjorner, Jakob Bue

    2012-05-01

    The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account. In the fall and winter of 2008, self-report data on work environment, health, workability and retirement plans were collected in a representative national sample (n = 3,122) of Danish employees 50 years or older. Ordinal logistic regression was used to analyse associations in a cross-sectional design. Predictor variables were standardized. In analyses adjusted for socio-demography, socio-economy, health, workability and work performance, 4 out of 6 examined psychosocial factors (ageism, lack of recognition, lack of development possibilities, lack of predictability) were significantly associated with plans of early retirement (OR: 1.10-1.13). Stratified on gender, three psychosocial factors (ageism, lack of recognition, lack of development possibilities) remained significant for men (OR: 1.15-1.25) and none for women. In particular was the association between retirement plans and ageism highly significant in the male subgroup, but no association was found in the female subgroup. Ageism, lack of recognition and lack of development possibilities are associated with older male workers' retirement plans in our analyses. Workability has the strongest association with retirement plans for both genders.

  7. Local land-use planning to conserve biodiversity: planners' perspectives on what works.

    Science.gov (United States)

    Stokes, David L; Hanson, Marian F; Oaks, Deborah D; Straub, Jaime E; Ponio, Aileen V

    2010-04-01

    Because habitat loss due to urbanization is a primary threat to biodiversity, and land-use decisions in urbanizing areas are mainly made at the local level, land-use planning by municipal planning departments has a potentially important--but largely unrealized--role in conserving biodiversity. To understand planners' perspectives on the factors that facilitate and impede biodiversity conservation in local planning, we interviewed directors of 17 municipal planning departments in the greater Seattle (Washington, U.S.A.) area and compared responses of planners from similar-sized jurisdictions that were "high" and "low performing" with respect to incorporation of biodiversity conservation in local planning. Planners from low-performing jurisdictions regarded mandates from higher governmental levels as the primary drivers of biodiversity conservation, whereas those from high-performing jurisdictions regarded community values as the main drivers, although they also indicated that mandates were important. Biodiversity conservation was associated with presence of local conservation flagship elements (e.g., salmonids) and human-centered benefits of biodiversity conservation (e.g., quality of life). Planners from high- and low-performing jurisdictions favored different planning mechanisms for biodiversity conservation, perhaps reflecting differences in funding and staffing. High performers reported more collaborations with other entities on biodiversity issues. Planners' comments indicated that the term biodiversity may be problematic in the context of local planning. The action most planners recommended to increase biodiversity conservation in local planning was public education. These results suggest that to advance biodiversity conservation in local land-use planning, conservation biologists should investigate and educate the public about local conservation flagships and human benefits of local biodiversity, work to raise ecological literacy and explain biodiversity more

  8. Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs.

  9. Consider the OIG Work Plan in your 2012 internal audit schedules.

    Science.gov (United States)

    Schaum, Kathleen D

    2011-12-01

    Wound care professionals should conduct monthly internal audits of their business processes. In addition to auditing, the coding, payment, and coverage issues that are considered issues by the Medicare contractor that processes your claims and the Medicare contractors that audit your claims and payments, be sure to include the OIG Work Plan topics that pertain to your wound care business. Remember, if atopic is important enough to make the OIG Work Plan, it should be important enough to make your 2012 internal audit plan. Because the Medicare Trust Fund is important to all US citizens, everyone has a responsibility to assist in combating fraud, waste, abuse, and mismanagement in HHS programs. Therefore, the OIG Hotline accepts tips from all sources. To provide a tip to the OIG Hotline, see Table 1 for contact information.

  10. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  11. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2011-06-17

    ... communities. Sustainability Policy All energy construction grants will proceed after business plans are... and small populations create a dilemma for these communities that need new clinics. The newly... construction to administration to allied health and other lines of work to sustain their families and remain in...

  12. The Interplay between Women's Life Course Work Patterns and Financial Planning for Later Life

    Science.gov (United States)

    Berger, Ellie D.; Denton, Margaret A.

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily…

  13. Attitudes of Social Work Students toward End-of-Life Planning.

    Science.gov (United States)

    Heyman, Janna C.; Gutheil, Irene A.

    2003-01-01

    Correlations and t-tests of data from 267 master of social work students found significant relationships between attitudes toward end-of-life planning and knowledge, comfort level, and personal desire for treatment; 57% were knowledgeable about living wills. Age, gender, and race accounted for only a small portion of variance in attitudes.…

  14. Review of Study Programme Renewal in Lithuania: Planning Students' Independent Work

    Science.gov (United States)

    Zibeniene, Gintaute

    2013-01-01

    The article introduces external quality assessment results of first cycle and second cycle study programmes renewed under the Human Resources Development Action Programme 2007-2013 priority direction 2 "Lifelong Learning" (hereinafter the "Programme") through the aspect of planning students' independent work. Problems faced…

  15. Students Working Online for Group Projects: A Test of an Extended Theory of Planned Behaviour Model

    Science.gov (United States)

    Cheng, Eddie W. L.

    2017-01-01

    This study examined an extended theory of planned behaviour (TPB) model that specified factors affecting students' intentions to collaborate online for group work. Past behaviour, past experience and actual behavioural control were incorporated in the extended TPB model. The mediating roles of attitudes, subjective norms and perceived behavioural…

  16. Phonological and Executive Working Memory in L2 Task-Based Speech Planning and Performance

    Science.gov (United States)

    Wen, Zhisheng

    2016-01-01

    The present study sets out to explore the distinctive roles played by two working memory (WM) components in various aspects of L2 task-based speech planning and performance. A group of 40 post-intermediate proficiency level Chinese EFL learners took part in the empirical study. Following the tenets and basic principles of the…

  17. Effects of dopamine D2/D3 receptor antagonism on human planning and spatial working memory.

    Science.gov (United States)

    Naef, M; Müller, U; Linssen, A; Clark, L; Robbins, T W; Eisenegger, C

    2017-04-25

    Psychopharmacological studies in humans suggest important roles for dopamine (DA) D2 receptors in human executive functions, such as cognitive planning and spatial working memory (SWM). However, studies that investigate an impairment of such functions using the selective DA D2/3 receptor antagonist sulpiride have yielded inconsistent results, perhaps because relatively low doses were used. We believe we report for the first time, the effects of a higher (800 mg p.o.) single dose of sulpiride as well as of genetic variation in the DA receptor D2 gene (DA receptor D2 Taq1A polymorphism), on planning and working memory. With 78 healthy male volunteers, we apply a between-groups, placebo-controlled design. We measure outcomes in the difficult versions of the Cambridge Neuropsychological Test Automated Battery One-Touch Stockings of Cambridge and the self-ordered SWM task. Volunteers in the sulpiride group showed significant impairments in planning accuracy and, for the more difficult problems, in SWM. Sulpiride administration speeded response latencies in the planning task on the most difficult problems. Volunteers with at least one copy of the minor allele (A1+) of the DA receptor D2 Taq1A polymorphism showed better SWM capacity, regardless of whether they received sulpiride or placebo. There were no effects on blood pressure, heart rate or subjective sedation. In sum, a higher single dose of sulpiride impairs SWM and executive planning functions, in a manner independent of the DA receptor D2 Taq1A polymorphism.

  18. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  19. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  20. Cancer survivorship care-planning: Practice, research, and policy implications for social work.

    Science.gov (United States)

    Wagner, Richard W; Pritzker, Suzanne

    2016-01-01

    Increasing numbers of cancer survivors are living longer than 5 years from their diagnosis date. This has resulted in a growing population of cancer survivors, expected to reach 19 million by 2024. Survivors frequently experience late effects caused by cancer and its treatment, reducing survivors' quality of life in multiple domains. Survivorship care-plans may aid the many physical, psychosocial, and financial needs that emerge posttreatment. However, the lack of reimbursement mechanisms, the limited amount of effectiveness research, and minimal guidelines for content and delivery are barriers to the widespread provision of survivorship care-plans. Challenges and opportunities for social work practice, research, and policy are identified and discussed.

  1. Planning development of mining works in geodynamic intense fields deposits of mineral wealth

    Energy Technology Data Exchange (ETDEWEB)

    Kuzmenko, A.M. [National Mining University of Ukraine, Dnipropetrovsk (Ukraine)

    1999-07-01

    The main thesis of mining development planning in the formed natural and artificial geodynamical fields of stresses where deposit exploration has occurred is stated. The influence of azimuth deviation of the move direction vector of face works to the rocks stressed-deformed state change when geodynamical fields are changed is considered. The influence of the deviation of the vector to the efficiency of use of face extraction mechanization means is also discussed. Mining development planning should take into account the stress field of rock massif as it reduces the ecological load to mining regions. 4 refs., 2 figs.

  2. Work Factors, Work-Family Conflict, the Theory of Planned Behaviour and Healthy Intentions: A Cross-Cultural Study.

    Science.gov (United States)

    Shukri, Madihah; Jones, Fiona; Conner, Mark

    2016-12-01

    The present study examined the roles of work factors (i.e. job demands and job resources), work-family conflicts and culture on predictors of healthy intentions (fruit and vegetable consumption, low-fat diet and physical activity) within the framework of the theory of planned behaviour (TPB). Employees from the United Kingdom (N = 278) and Malaysia (N = 325) participated in the study. Results indicated that higher job demands were significantly related to lower intentions to eat a low-fat diet. Women reported higher intentions to eat a low-fat diet than men did, while participants from the United Kingdom had lower intentions to engage in physical activity compared with those from Malaysia. The efficacy of TPB variables in explaining intentions was verified, with perceived behavioural control (i.e. self-efficacy), attitudes and descriptive norms combined with past behaviour predictive across the samples. The results also suggest the roles of culture and work interference with family variables in moderating TPB-intention relationships and confirm that TPB variables mediate the effects of job demands and job resources on intentions. Practically, to promote health, identifying strategies to reduce stress factors; specifying important cognitive factors affecting work factors and thus, healthy intentions; and acknowledging cultural-specific determinants of healthy intentions are recommended. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  3. Interim OECA Guidance on Enhancing Regional-State Planning and Communication on Compliance Assurance Work in Authorized States

    Science.gov (United States)

    Guidance outlining principles and best practices for State and EPA collaboration in inspections and enforcement. work planning and implementation. National Enforcement Initiatives, and outcome and performance measurement.

  4. TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals

    Science.gov (United States)

    TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.

  5. Work plan, health and safety plan, and quality assurance project plan for hazardous waste removal at the CTF K-1654B underground collection tank

    Energy Technology Data Exchange (ETDEWEB)

    Panter, M.S.; Burman, S.N.; Landguth, D.C.; Uziel, M.S.

    1991-10-01

    The Central Training Facility (CTF), located on Bear Creek Road approximately two miles south of the K-25 Site, is utilized for training security personnel at Martin Marietta Energy Systems, Inc., Oak Ridge, Tennessee. At the request of the CTF staff, this plan has been developed for the removal of the waste contents in the facility's 500-gal septic tank and associated distribution box. The septic tank and distribution box were historically located beneath the K-1654B trailer and adjacent to the K-1654A Indoor Firing Range. Recently, however, the K-1654B trailer was removed to accommodate the objectives of this work plan as well as future construction activities planned at CTF. The purpose of this plan is to develop and assign responsibilities, establish personnel protection requirements and mandatory safety procedures, and provide for contingencies that may arise while operations are being conducted by ORNL/MAD at the CTF K-1654B underground collection tank site. This document addresses requirements of 29 CFR 1910.120, Final Rule, with respect to aspects of health and safety applicable to an underground collection tank waste removal.

  6. Work plan, health and safety plan, and quality assurance project plan for hazardous waste removal at the CTF K-1654B underground collection tank

    Energy Technology Data Exchange (ETDEWEB)

    Panter, M.S.; Burman, S.N.; Landguth, D.C.; Uziel, M.S.

    1991-10-01

    The Central Training Facility (CTF), located on Bear Creek Road approximately two miles south of the K-25 Site, is utilized for training security personnel at Martin Marietta Energy Systems, Inc., Oak Ridge, Tennessee. At the request of the CTF staff, this plan has been developed for the removal of the waste contents in the facility`s 500-gal septic tank and associated distribution box. The septic tank and distribution box were historically located beneath the K-1654B trailer and adjacent to the K-1654A Indoor Firing Range. Recently, however, the K-1654B trailer was removed to accommodate the objectives of this work plan as well as future construction activities planned at CTF. The purpose of this plan is to develop and assign responsibilities, establish personnel protection requirements and mandatory safety procedures, and provide for contingencies that may arise while operations are being conducted by ORNL/MAD at the CTF K-1654B underground collection tank site. This document addresses requirements of 29 CFR 1910.120, Final Rule, with respect to aspects of health and safety applicable to an underground collection tank waste removal.

  7. Addendum to the performance assessment analysis for low-level waste disposal in the 200 west area active burial grounds

    Energy Technology Data Exchange (ETDEWEB)

    Wood, M.I., Westinghouse Hanford

    1996-12-20

    An addendum was completed to the performance assessment (PA) analysis for the active 200 West Area low-level solid waste burial grounds. The addendum includes supplemental information developed during the review of the PA analysis, an ALARA analysis, a comparison of PA results with the Hanford Groundwater Protection Strategy, and a justification for the assumption of 500 year deterrence to the inadvertent intruder.

  8. Informal work and formal plans: articulating the active role of patients in cancer trajectories

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Brostrøm Kousgaard, Marius

    2012-01-01

    trajectories. Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. Results: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. Discussion: Work done by patients was invisible and not perceived as work....... The patients’ requests were not sufficiently supported in the professional organisation of work or formal planning. Patients’ insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients´ active...

  9. Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2011-02-24

    This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

  10. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1987-1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide Bonneville Power Administration (BPA) in carrying out our responsibility to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gave BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife were affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for Program implementation during Fiscal Year (FY) 1988. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Program's Action Plan: to provide a solid, timely, and focused basis for budgeting and planning. Additionally, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3. It includes schedules with key milestones for FY 1988 through FY 1990. The Work Plan is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program.

  12. The effects of moderate heat stress and open-plan office noise distraction on office work

    DEFF Research Database (Denmark)

    Witterseh, Thomas; Wyon, David; Clausen, Geo

    2002-01-01

    Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P......Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P...

  13. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  14. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  15. Senior dental students' career intentions, work-life balance and retirement plans.

    Science.gov (United States)

    Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D

    2007-09-08

    To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.

  16. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  17. Trainees May Add Value to Patient Care by Decreasing Addendum Utilization in Radiology Reports.

    Science.gov (United States)

    Balthazar, Patricia; Konstantopoulos, Christina; Wick, Carson A; DeSimone, Ariadne K; Tridandapani, Srini; Simoneaux, Stephen; Applegate, Kimberly E

    2017-11-01

    The purpose of this study was to evaluate the impact of trainee involvement and other factors on addendum rates in radiology reports. This retrospective study was performed in a tertiary care pediatric hospital. From the institutional radiology data repository, we extracted all radiology reports from January 1 to June 30, 2016, as well as trainee (resident or fellow) involvement, imaging modality, patient setting (emergency, inpatient, or outpatient), order status (routine vs immediate), time of interpretation (regular work hours vs off-hours), radiologist's years of experience, and sex. We grouped imaging modalities as advanced (CT, MRI, and PET) or nonadvanced (any modality that was not CT, MRI, or PET) and radiologist experience level as ≤ 20 years or > 20 years. Our outcome measure was the rate of addenda in radiology reports. Statistical analysis was performed using multivariate logistic regression. From 129,033 reports finalized during the study period, 418 (0.3%) had addenda. Reports generated without trainees were 12 times more likely than reports with trainee involvement to have addenda (odds ratio [OR] = 12.2, p radiology reports.

  18. Making Strategic Planning Work in Local Government: An Empirical Study of Success And Failure

    Directory of Open Access Journals (Sweden)

    Ángel IGLESIAS

    2015-10-01

    Full Text Available Since the 1990s, local governments all over Europe have launched reforms to improve local democracy, public management and efficiency in the provision of local services. Some of these reforms are inspired by what previously has worked in private management and some of them have also a macro-level approach, whose main aim is to introduce institutional reforms and reorganizations to ensure contextual problem solving by strengthening governance within the local public sector. In this context, Strategic Planning in public organizations has attracted interest among academic researchers and practitioners as an instrument for dealing with a complex environment and for the achievement of higher performance and the attainment of greater democracy. But the decision on how to introduce Strategic Planning might follow a different rationale. The hypothesis maintained in this paper is that those that are based in an endogenous rationale are more likely to succeed. To test our hypothesis this paper draws on a comparative empirical analysis concerning the design and implementation of a Strategic Planning process within two Spanish city governments: one considered to have been a failure and the other a success. Focusing on the way in which the use of Strategic Planning has to face the trade-offs between urban and economic development and democracy, the paper explores how this formal mechanism of citizen´s and business’ participation serves to establish relational processes to reinvigorate local economic development, democracy and administrative modernization only when a strong political and administrative leadership is put into motion. Overall, the study yields evidence consistent with the notion that a successful Strategic Planning at the local level has to take into account not only institutional issues, but also the communal, social and political resources that frame the deliberations propelled by the Strategic Planning process.

  19. Life Planning Resource Guide. A Resource for Teaching the Life Planning Core Course Area of Ohio's Work and Family Life Program.

    Science.gov (United States)

    Kister, Joanna; And Others

    This guide is designed to assist vocational home economics teachers in implementing the life planning course that is one of the six core course areas of Ohio's Work and Family Life program. Included in the guide are an introduction providing an overview of the practical problems proposed in the life planning core course area, four process modules,…

  20. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  1. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    Energy Technology Data Exchange (ETDEWEB)

    SCHULTZ, E.A.

    1998-10-01

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  2. Verbal working memory and planning: learning to compare movement durations of objects.

    Science.gov (United States)

    Okazaki, Yoshihiro; Matsuda, Fumiko

    2010-12-01

    Relations between duration judgments and verbal or visual working memory, between duration judgments and effect of learning to plan the processing of information about such judgments were investigated. A computer monitor was used to present images of two cars traveling in the same direction for various durations and distances. Participants (N=30) were asked to identify the car that had traveled for the longer duration. Then, participants learned how to solve Piagetian tasks logically. After the learning, they tried to solve the duration judgments task again. Finally, their verbal and visual working memory capacities were assessed. Results indicated the following: (a) numbers of correct answers on the Piagetian tasks were correlated with verbal and visual working memory capacity; (b) the correlations did not significantly decrease after the participants learned how to solve the Piagetian tasks.

  3. Informal work and formal plans: articulating the active role of patients in cancer trajectories

    Directory of Open Access Journals (Sweden)

    Rikke Juul Dalsted

    2012-12-01

    Full Text Available Introduction: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories.   Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included.   Results: Patients continuously took initiatives to organize their treatment and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories.  Patients presented problems to the healthcare professionals in order to get proper help when needed.   Discussion: Work done by patients was invisible and not perceived as work. The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients´ active participation. When looking at integrated care from the perspective of patients, the development of a more holistic and personalized approach is needed. Introduction: Formal pathway models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories. Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. Results: Patients continuously took initiatives to organize their

  4. Informal work and formal plans: articulating the active role of patients in cancer trajectories

    Directory of Open Access Journals (Sweden)

    Rikke Juul Dalsted

    2012-12-01

    Full Text Available Introduction: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories.  Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included.  Results: Patients continuously took initiatives to organize their treatment and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories.  Patients presented problems to the healthcare professionals in order to get proper help when needed.  Discussion: Work done by patients was invisible and not perceived as work. The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients´ active participation. When looking at integrated care from the perspective of patients, the development of a more holistic and personalized approach is needed. Introduction: Formal pathway models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories. Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. Results: Patients continuously took initiatives to organize their

  5. Effect of the Operation of Kerr and Hungry Horse Dams on the Reproductive Success of Kokanee in the Flathead System; Technical Addendum to the Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, Will; Tohtz, Joel

    1990-03-01

    This addendum to the Final Report presents results of research on the zooplankton and fish communities of Flathead Lade. The intent of the Study has been to identify the impacts of hydroelectric operations at Kerr and Hungry Horse Dam on the reproductive success of kokanee an to propose mitigation for these impacts. Recent changes in the trophic ecology of the lake, have reduced the survival of kokanee. In the last three year the Study has been redirected to identify, if possible, the biological mechanisms which now limit kokanee survival, and to test methods of enhancing the kokanee fishery by artificial supplementation. These studies were necessary to the formulation of mitigation plans. The possibility of successfully rehabilitating the kokanee population, is the doubt because of change in the trophic ecology of the system. This report first presents the results of studies of the population dynamics of crustacean zooplankton, upon which planktivorous fish depend. A modest effort was directed to measuring the spawning escapement of kokanee in 1988. Because of its relevance to the study, we also report assessments of 1989 kokanee spawning escapement. Hydroacoustic assessment of the abundance of all fish species in Flathead Lake was conducted in November, 1988. Summary of the continued efforts to document the growth rates and food habits of kokanee and lake whitefish are included in this report. Revised kokanee spawning and harvest estimates, and management implications of the altered ecology of Flathead Lake comprise the final sections of this addendum. 83 refs., 20 figs., 25 tabs.

  6. A social work perspective: attitudes toward end-of-life planning.

    Science.gov (United States)

    Gutheil, Irene A; Heyman, Janna C

    2011-01-01

    This research examined social workers' attitudes toward end-of-life planning and related factors in a cross-sectional study (N = 844). Data were gathered on completion of a health care proxy, personal comfort, training experiences of social workers, and demographics. Attitudes toward end-of-life planning were related to personal completion of the health care proxy, personal comfort, and years of social work experience. These measures remained significant in all steps of the regression, regardless of practice grouping (health and aging or other than health and aging), suggesting the relative importance of personal rather than professional aspects. Respondents in the health and aging fields are older than those in other than health and aging, underscoring concerns about workforce issues in the field of aging.

  7. Developing an integrated project plan for the preparation of a Remedial Investigation/Feasibility Study Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    Swanston, B.

    1994-04-01

    The purpose of project planning is to develop a formalized baseline project plan that is used during project execution to track and monitor project performance. The baseline project plan developed under the guidelines presented in this paper integrates the technical scope, schedule, and budget so that the objectives of the project can be accomplished. During project execution, performance data are collected and measured against this baseline project plan. When performance varies from the plan, timely actions can be taken to alleviate potential problems. Thus, effective performance measurement is ultimately a function of the quality of the baseline project plan. When viewed in this light, the importance of a quality baseline project plan cannot be overemphasized.

  8. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  9. Addendum: First injection technique recommendations for patients with diabetes, Forum for Injection Techniques India

    Directory of Open Access Journals (Sweden)

    Sanjay Kalra

    2013-01-01

    Full Text Available The forum for injection techniques, India recommendation, the first ever in the country on insulin injcetion techniques, have covered the science and the art of insulin injection technique in an exhaustive manner. However, a few gaps were identified in the document, which are addressed in the current addendum. This article focuses on insulin injection technique in special clinical situations, including geriatric people, women in pregnancy and those with dermatological or surgical disease who live with diabetes. The addendum also covers salient features of administration of insulin using the insulin pump.

  10. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  11. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    Directory of Open Access Journals (Sweden)

    Nava Tintarev

    2016-11-01

    Full Text Available This paper addresses research questions that are central to the area of visualization interfaces for decision support: RQ1 whether individual user differences in working memory should be considered when making choosing how to present visualizations; RQ2 how to present the visualization to support effective decision making and processing; and RQ3 how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1. The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2, we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3 we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  12. Indoor climate, psychosocial work environment and symptoms in open-plan offices

    DEFF Research Database (Denmark)

    Pejtersen, J; Allermann, L; Kristensen, T S

    2006-01-01

    To study the indoor climate, the psychosocial work environment and occupants' symptoms in offices a cross-sectional questionnaire survey was made in 11 naturally and 11 mechanically ventilated office buildings. Nine of the buildings had mainly cellular offices; five of the buildings had mainly open...... irritation, skin irritation, central nervous system (CNS) symptoms and psychosocial factors. Occupants in open-plan offices are more likely to perceive thermal discomfort, poor air quality and noise and they more frequently complain about CNS and mucous membrane symptoms than occupants in multi...

  13. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  14. Working Group 1: Current plans of various organisations for lunar activities

    Science.gov (United States)

    Balsiger, H.; Pilcher, C.

    1994-01-01

    Summaries of presentations by representatives of several space agencies and the International Academy of Astronautics concerning lunar activities are presented. Participating space agencies reported two different types of lunar planning, long term planning and scenarios and lunar missions competing within regular programs. The long term plans of the various agencies look remarkably similar. They all involve a phased approach (coincidentally all incorporating four phases) and all address three prime scientific elements: science of, on, and from the Moon. The missions under consideration by the second group of agencies could readily fit as elements in the longer term program. There is great interest in lunar astronomy. There is a great deal of potential infrastructure and lunar transport capability already available. There is also a wide range of interesting technological developments that could form part of a lunar program. A well concerted and coordinated international effort could lead to an affordable program. Recommendations are: an international conference on lunar exploration should be held every other year; an electronic network should be established for the daily exchange of information; and a mechanism should be established for regular working level coordination of activities.

  15. Revitalizing communities together: the shared values, goals, and work of education, urban planning, and public health.

    Science.gov (United States)

    Cohen, Alison Klebanoff; Schuchter, Joseph W

    2013-04-01

    Inequities in education, the urban environment, and health co-exist and mutually reinforce each other. Educators, planners, and public health practitioners share commitments to place-based, participatory, youth-focused, and equitable work. They also have shared goals of building community resilience, social capital, and civic engagement. Interdisciplinary programs that embody these shared values and work towards these shared goals are emerging, including school-based health centers, full-service community schools, community health centers, Promise Neighborhoods, and Choice Neighborhoods. The intersection of these three fields represents an opportunity to intervene on social determinants of health. More collaborative research and practice across public health, education, and planning should build from the shared values identified to continue to address these common goals.

  16. The Impact of Appearance Management Training, Work Status, and Plans after High School on Opinions Regarding Appearance at Work and School

    Science.gov (United States)

    Freeburg, Beth Winfrey; Arnett, Sally E.

    2010-01-01

    The purpose of this study was to measure the effect of appearance management training, work status, and plans after high school on students' opinions about appearance at school and at work. A nonprobability sample of 132 high school juniors and seniors in a consumer education class were administered the Appearance Management Survey before and…

  17. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  18. Plan for improving the organizational climate variables that affect work performance in a state enterprise

    Directory of Open Access Journals (Sweden)

    Bibiana Cubillos Rivera

    2014-07-01

    Full Text Available This investigation presents an analysis on the assessments of organizational climate and work performance of a state enterprise. From this analytical process and based on the results obtained in interviews applied to the managers of the organization, as well as in the theoretical review of these two variables and their relationship to each other, those aspects of organizational climate that most affect the results of the staff are determined. An improvement plan is proposed for the organization, focused on two strategies that directly affect work performance through the intervention of the organizational climate variables that affect it negatively, thus ensuring that this, in turn, is reflected in the scope of both individual and corporate goals. This will also check that, from the area of human management, it can directly influence the strategy of the organizations, ceasing to be seen as an area of support and showing that it can be fully aligned with the mission, vision and in the overall organizational planning.

  19. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  20. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing

  2. The Timmons Savings Plan: A Working Document on a Plan to Encourage Families to Save for College.

    Science.gov (United States)

    Tierney, Michael L.

    The Timmons Savings Plan, which encourages families to save toward college costs, is analyzed. This plan allows for periodic (non-tax deductible) contributions to an account administered by the U.S. Department of the Treasury. The amount deposited would be matched by the federal government in exchange for the government's earning the interest on…

  3. Social Work Discharge Planning in Acute Care Hospitals in Israel: Clients' Evaluation of the Discharge Planning Process and Adequacy

    Science.gov (United States)

    Soskolne, Varda; Kaplan, Giora; Ben-Shahar, Ilana; Stanger, Varda; Auslander, Gail. K.

    2010-01-01

    Objective: To examine the associations of patients' characteristics, hospitalization factors, and the patients' or family assessment of the discharge planning process, with their evaluation of adequacy of the discharge plan. Method: A prospective study. Social workers from 11 acute care hospitals in Israel provided data on 1426 discharged…

  4. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  5. Multi-Working Modes Product-Color Planning Based on Evolutionary Algorithms and Swarm Intelligence

    Directory of Open Access Journals (Sweden)

    Man Ding

    2010-01-01

    Full Text Available In order to assist designer in color planning during product development, a novel synthesized evaluation method is presented to evaluate color-combination schemes of multi-working modes products (MMPs. The proposed evaluation method considers color-combination images in different working modes as evaluating attributes, to which the corresponding weights are assigned for synthesized evaluation. Then a mathematical model is developed to search for optimal color-combination schemes of MMP based on the proposed evaluation method and two powerful search techniques known as Evolution Algorithms (EAs and Swarm Intelligence (SI. In the experiments, we present a comparative study for two EAs, namely, Genetic Algorithm (GA and Difference Evolution (DE, and one SI algorithm, namely, Particle Swarm Optimization (PSO, on searching for color-combination schemes of MMP problem. All of the algorithms are evaluated against a test scenario, namely, an Arm-type aerial work platform, which has two working modes. The results show that the DE obtains the superior solution than the other two algorithms for color-combination scheme searching problem in terms of optimization accuracy and computation robustness. Simulation results demonstrate that the proposed method is feasible and efficient.

  6. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.

  7. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    Science.gov (United States)

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  8. National Wildlife Refuge System Inventory and Monitoring Regional Annual Work Plan : Mountain-Prairie Region 6 Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 6 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  9. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ... environment. Line management includes those Contractor and subcontractor employees managing or supervising...&H) are established and maintained at all organizational levels. (3) Personnel possess the experience... work planning, budgeting, authorization, execution, and change control. (f) The Contractor shall comply...

  10. Hanford environmental management program multi-year work plan FY1998

    Energy Technology Data Exchange (ETDEWEB)

    Giese, K.A.

    1997-08-25

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year`s work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ``Work Authorization`` identifies the impacted scope and requires the Contracting Officer`s or Assistant Manager-Contracting Officer`s Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ``Project Summary Section`` and Section Two is titled the ``Additional Sections at the Project Baseline Summaries Level``. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS {number_sign} RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  11. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  12. ADDENDUM TO ASSESSMENT OF STYRENE EMISSION CONTROLS FOR FRP/C AND BOAT BUILDING INDUSTRIES

    Science.gov (United States)

    This report is an addendum to a 1996 report, Assessment of Styrene Emission Controls for FRP/C and Boat Building Industries. It presents additional evaluation of the biological treatment of styrene emissions, Dow Chemical Company's Sorbathene solvent vapor recovery system, Occupa...

  13. 2011 Addendum to the SNL/NM SWEIS Supplemental Information Source Documents

    Energy Technology Data Exchange (ETDEWEB)

    Dimmick, Ross [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-12-01

    This document contains updates to the Supplemental Information Sandia National Laboratories/New Mexico Site-Wide Environmental Impact Statement Source Documents that were developed in 2010. In general, this addendum provides calendar year 2010 data, along with changes or additions to text in the original documents.

  14. Qualification Tests for the Air Sampling System at the 296-Z-7 Stack, Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Glissmeyer, John A.; Maughan, A. D.

    2002-02-05

    This addendum report documents tests performed to verify that the stack flow monitoring system for the 296-Z-7 ventilation exhaust stack meets the applicable regulatory criteria regarding stack flow measurement accuracy. These criteria ensure that the stack flow measurements have sufficient accuracy for use in estimating stack emissions. The tests performed demonstrated that operability and accuracy requirements were met.

  15. A Rent-Seeking Model of Voluntary Overcompliance : Addendum (vol 65, pg 313, 2016)

    NARCIS (Netherlands)

    Haan, Marco A.

    In a previous paper (Haan in Environ Resour Econ, 2016) I missed some relevant literature essentially related to that paper. In this addendum I discuss how two earlier contributions (Graichen et al. in Public Choice 108:273-293, 2001; Liston-Heyes in J Environ Econ Manag 41:1-12, 2001) are related

  16. 2007 regional planning handbook : a guide to administering overall work programs, regional transportation plans and their funding sources.

    Science.gov (United States)

    2007-01-01

    This Handbook describes the respective roles and responsibilities for District Transportation Planners with regional transportation planning duties, and for Transportation Planners within ORIP. The focus is Department interaction with the Metropolita...

  17. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  18. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

  19. Particularities of Expropriation Works for Highways and Regional Planning in Romania

    Science.gov (United States)

    Moscovici, Anca-Maria; Constantin Musat, Cosmin

    2017-10-01

    In the actual context of modernization and development of the road and railway infrastructure of Romania, we have to make some expropriation works. These works can assure the legal basis on which a said patch will be transferred from a private owner to the ownership of the Romanian state in order to be used for public interest, while the original owner would receive compensation for the patch of land. In this paper we wish to address the particularities of expropriation for highways and regional planning that provide the legal basis by which an estate passes from private property to state ownership in the public interest needs, none the less compensation being paid. In 2006-2007 began the first works of expropriation of land, on the Arad-Timisoara motorway section, under Government Decision no. 1546/2006. The motorway section we will bring up for discussion in 2016 is situated in the administrative-territorial division Galda de Jos, Alba Iulia County. For patches affected by the highway corridor, if it is to expropriate part of the patch, the cadastral documentation has to be established individually for each resulting lot, respectively for the lot/lots that remain in the ownership of the original owner, but also for the expropriated lot.

  20. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  1. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  2. Brain Malignancy Steering Committee clinical trials planning workshop: report from the Targeted Therapies Working Group.

    Science.gov (United States)

    Alexander, Brian M; Galanis, Evanthia; Yung, W K Alfred; Ballman, Karla V; Boyett, James M; Cloughesy, Timothy F; Degroot, John F; Huse, Jason T; Mann, Bhupinder; Mason, Warren; Mellinghoff, Ingo K; Mikkelsen, Tom; Mischel, Paul S; O'Neill, Brian P; Prados, Michael D; Sarkaria, Jann N; Tawab-Amiri, Abdul; Trippa, Lorenzo; Ye, Xiaobu; Ligon, Keith L; Berry, Donald A; Wen, Patrick Y

    2015-02-01

    Glioblastoma is the most common primary brain malignancy and is associated with poor prognosis despite aggressive local and systemic therapy, which is related to a paucity of viable treatment options in both the newly diagnosed and recurrent settings. Even so, the rapidly increasing number of targeted therapies being evaluated in oncology clinical trials offers hope for the future. Given the broad range of possibilities for future trials, the Brain Malignancy Steering Committee convened a clinical trials planning meeting that was held at the Udvar-Hazy Center in Chantilly, Virginia, on September 19 and 20, 2013. This manuscript reports the deliberations leading up to the event from the Targeted Therapies Working Group and the results of the meeting. © The Author(s) 2014. Published by Oxford University Press on behalf of the Society for Neuro-Oncology. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. Site observational work plan for the UMTRA Project site at Falls City, Texas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

  4. International Conference on Harmonisation; addendum to International Conference on Harmonisation Guidance on S6 Preclinical Safety Evaluation of Biotechnology-Derived Pharmaceuticals; availability. Notice.

    Science.gov (United States)

    2012-05-18

    The Food and Drug Administration (FDA) is announcing the availability of a guidance entitled "S6 Addendum to Preclinical Safety Evaluation of Biotechnology-Derived Pharmaceuticals'' (S6 addendum). The S6 addendum was prepared under the auspices of the International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals for Human Use (ICH). The S6 addendum is intended to incorporate new knowledge and experience gained since the implementation of the ICH guidance entitled "S6 Preclinical Safety Evaluation of Biotechnology-Derived Pharmaceuticals'' (ICH S6) and to clarify and provide greater detail to enable the development of safe and effective biopharmaceuticals.

  5. Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

    1995-03-01

    The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

  6. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  7. It's that time of year again: have you read the 2013 Office of Inspector General work plan?

    Science.gov (United States)

    Schaum, Kathleen D

    2012-12-01

    The Work Plan is useful because it gives providers a preview of many of the OIG’s enforcement priorities planned for fiscal year 2013.Wound care providers should take advantage of this opportunity to determine how to focus their compliance program activities over the next 12 months.Wound care providers should read the Work Plan for Fiscal Year 2013 for further information and references about the OIG issues. The Work Plan will help you to identify corporate compliance risk areas that you should audit and for which you should create/upgrade policies. Be sure to read the document and take a proactive approach by conducting internal audits to identify areas of improvement that you can make before you receive an external audit.

  8. "An addendum to breast cancer": the triple negative experience.

    Science.gov (United States)

    Turkman, Yasemin E; Kennedy, Holly Powell; Harris, Lyndsay N; Knobf, M Tish

    2016-09-01

    The triple negative breast cancer (TNBC) subtype, known to be aggressive with high recurrence and mortality rates, disproportionately affects African-Americans, young women, and BRCA1 carriers. TNBC does not respond to hormonal or biologic agents, limiting treatment options. The unique characteristics of the disease and the populations disproportionately affected indicate a need to examine the responses of this group. No known studies describe the psychosocial experiences of women with TNBC. The purpose of this study is to begin to fill that gap and to explore participants' psychosocial needs. An interpretive descriptive qualitative approach was used with in-depth interviews. A purposive sample of adult women with TNBC was recruited. Dominant themes were extracted through iterative and constant comparative analysis. Of the 22 participants, nearly half were women of color, and the majority was under the age of 60 years and within 5 years of diagnosis. The central theme was a perception of TNBC as "an addendum" to breast cancer. There were four subthemes: TNBC is Different: "Bottom line, it's not good"; Feeling Insecure: "Flying without a net"; Decision-Making and Understanding: "A steep learning curve"; and Looking Back: "Coulda, shoulda, woulda." Participants expressed a need for support in managing intense uncertainty with a TNBC diagnosis and in decision-making. Women with all subtypes of breast cancer have typically been studied together. This is the first study on the psychosocial needs specifically of women with TNBC. The findings suggest that women with TNBC may have unique experiences and unmet psychosocial needs.

  9. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  10. Contribution of Reactive and Proactive Control to Children's Working Memory Performance: Insight from Item Recall Durations in Response Sequence Planning

    Science.gov (United States)

    Chevalier, Nicolas; James, Tiffany D.; Wiebe, Sandra A.; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-01-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names.…

  11. Theoretical Antecedents of Standing at Work: An Experience Sampling Approach Using the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    M. Renée Umstattd Meyer

    2016-09-01

    Full Text Available Time spent sitting has been associated with an increased risk of diabetes, cancer, obesity, and mental health impairments. However, 75% of Americans spend most of their days sitting, with work-sitting accounting for 63% of total daily sitting time. Little research examining theory-based antecedents of standing or sitting has been conducted. This lack of solid groundwork makes it difficult to design effective intervention strategies to decrease sitting behaviors. Using the Theory of Planned Behavior (TPB as our theoretical lens to better understand factors related with beneficial standing behaviors already being practiced, we examined relationships between TPB constructs and time spent standing at work among “positive deviants” (those successful in behavior change. Experience sampling methodology (ESM, 4 times a day (midmorning, before lunch, afternoon, and before leaving work for 5 consecutive workdays (Monday to Friday, was used to assess employees’ standing time. TPB scales assessing attitude (α = 0.81–0.84, norms (α = 0.83, perceived behavioral control (α = 0.77, and intention (α = 0.78 were developed using recommended methods and collected once on the Friday before the ESM surveys started. ESM data are hierarchically nested, therefore we tested our hypotheses using multilevel structural equation modeling with Mplus. Hourly full-time university employees (n = 50; 70.6% female, 84.3% white, mean age = 44 (SD = 11, 88.2%in full-time staff positions with sedentary occupation types (time at desk while working ≥6 hours/day participated. A total of 871 daily surveys were completed. Only perceived behavioral control (β = 0.45, p < 0.05 was related with work-standing at the event-level (model fit: just fit; mediation through intention was not supported. This is the first study to examine theoretical antecedents of real-time work-standing in a naturalistic field setting among positive deviants. These relationships should be further

  12. Reply to the SPSC questions on Addendum CERN-SPSC-2015-038 entitled ''Beam momentum scan with Pb+Pb collisions'' by NA61/SHINE at the CERN SPS

    CERN Document Server

    Aduszkiewicz, A

    2016-01-01

    This document presents answers of the NA61/SHINE Collaborations to the SPSC questions on the addendum CERN-SPSC-2015-038; SPSC-P-330-ADD-8 (referred to as ''Addendum'') to the NA61/SHINE proposal. Addendum requests an extension of the NA61/SHINE measurements by a beam momentum scan with Pb+Pb collisions.

  13. Annual Habitat Work Plan – 2003 : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River National Wildlife Refuge is currently developing a habitat management plan for its management. The Refuge finalized a master plan in 1986; however, much...

  14. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC {section}7901 et seq.) and the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts.

  15. An Integrated Work Force Planning Strategy For The Health Services 2009 - 2012

    OpenAIRE

    Department of Health and Children

    2009-01-01

    Workforce planning identifies the composition of the workforce required to deliver health service goals. It encompasses a range of human resource activities aimed at the short, medium and long-term. Workforce planning that is integrated with service and financial planning offers the best opportunity for linking human resource decisions to the strategic goals for the health services. Systems and structures are required to support and develop workforce planning activities

  16. When planning results in loss of control: intention-based reflexivity and working-memory

    OpenAIRE

    Meiran, Nachshon; Cole, Michael W.; Braver, Todd S.

    2012-01-01

    In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed “intention-based reflexivity.” The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand). When the plans are practiced, intention-based reflexivity depends on the prior availability of response cod...

  17. Performance evaluation of alternative fuel/engine concepts 1990- 1995. Final report including addendum of diesel vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Nylund, N.O.; Ikonen, M.; Kytoe, M.; Lappi, M.; Westerholm, M.; Laurikko, J. [VTT Energy, Espoo (Finland). Energy Use

    1996-12-31

    Annex V within the IEA Agreement on Alternative Motor Fuels is the first subtask to generate new experimental data. The objective of the task is to generate information on the emission potential of alternative fuels in severe operating conditions and to evaluate new emission measurement methods. The work was carried out in three phases, Engine Tests, Vehicle Tests and Addendum of Diesel Vehicles. The work was carried out at VTT (Technical Research Centre of Finland) as a cost shared operation. Participants were Belgium (Parts Two and Three), Canada (Parts One and Two), Finland, Italy (Part One), Japan, the Netherlands Sweden and USA. The United Kingdom also joined at the end of the Annex. The work included 143 different vehicle/fuel/temperature combinations. FTP type emission tests were run on 14 vehicles powered with different gasoline compositions, methanol (M50 and M85), ethanol (E85), LPG, CNG and diesel. Both regulated and unregulated emission components were measured using the most up-to-date emissions measurement technology. The results indicated, that today`s advanced gasoline vehicles must be considered rather clean. Diesel is comparable with gasoline in the case of CO and HC. M85 gives low emissions in warm conditions, but unburned methanol must be controlled. Natural gas and LPG are inherently clean fuels which, using up-to-date engine technology, give low emissions in all conditions. (orig.) (29 refs.)

  18. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water.

  19. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

  20. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  1. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  2. Addendum 2: Logs of monitor wells drilled May 1988 through December 1992

    Energy Technology Data Exchange (ETDEWEB)

    Stout, J. [Ray Raskin Associates Inc., Tempe, AZ (United States); Qualheim, B. [Lawrence Livermore National Lab., CA (United States); McPherrin, R. [Lawrence Livermore National Lab., CA (United States); Barber, K. [Allied Signal Technical Services, Livermore, CA (United States); Hedegaard, R. [ICF Kaiser Engineers, San Francisco, CA (United States); McConihe, W.; Miller, T. [Brown and Caldwell, Pleasanton, CA (United States)

    1993-11-01

    The logs in this addendum were plotted in a new format by the same software package (LOGGER by Rockware, Denver, CO) that was used in the original publication. The scale remains the same, 1 inch = 15 foot. The header is totally automated with a subheading indexing the well-construction symbols. Geophysical curves are labeled in their respective channels, and percentage core recovery is plotted in a histogram. Lithologic symbols are plotted to scale in a channel similar to previous logs. The lithologic description also has been automated to assure consistency in terminology. Descriptions are more extensive and are referenced by leader lines to the lithologic symbol. Additional figures included for this Addendum are: a plot of all the monitoring well locations at the LLNL Main site and a plot detailing the gasoline spill area well locations in the vicinity of Building 403.

  3. Dictionary of Minor Planet Names Addendum to Fifth Edition: 2006 - 2008

    CERN Document Server

    Schmadel, Lutz

    2009-01-01

    The second Addendum to the Dictionary of Minor Planet Names, fifth edition, which is the IAU's official reference for the field, contains all newly published names from the period 2006-2008 as well as corrections and amendments to earlier editions. In total the Dictionary of Minor Planet Names now covers some 15000 named minor planets. It provides authoritative information about the basis for the rich and colorful variety of ingenious names, from heavenly goddesses to more prosaic constructions.

  4. Chemoprevention of Breast Cancer by Mimicking the Protective Effect of Early First Birth. Addendum

    Science.gov (United States)

    2013-03-01

    densities and breast cancer risk. Cancer Epidemiol Biomarkers Prev 1998;7:1133-44. 4. Bartow SA, Pathak DR, Mettler FA. Radiographic microcalcification ...AD_________________ Award Number: W81XWH-05-1-0390 TITLE: Chemoprevention of breast cancer by...REPORT TYPE Final addendum 3. DATES COVERED 2 May 2012 – 2 February 2013 4. TITLE AND SUBTITLE Chemoprevention of breast cancer by mimicking the

  5. Reflexive planning as design and work: lessons from the Port of Amsterdam

    NARCIS (Netherlands)

    Lissandrello, E.; Grin, J.

    2011-01-01

    In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that "reflexivity" has a strong temporal dimension: it not only aims to solve

  6. Planning, Management and Evaluation: Realizing PIC Potential. Private Industry Council Guide. Working Draft.

    Science.gov (United States)

    National Alliance of Business, Inc., Washington, DC.

    This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…

  7. Planning sentences while doing other things at the same time: effects of concurrent verbal and visuospatial working memory load.

    Science.gov (United States)

    Klaus, Jana; Mädebach, Andreas; Oppermann, Frank; Jescheniak, Jörg D

    2017-04-01

    This study investigated to what extent advance planning during sentence production is affected by a concurrent cognitive load. In two picture-word interference experiments in which participants produced subject-verb-object sentences while ignoring auditory distractor words, we assessed advance planning at a phonological (lexeme) and at an abstract-lexical (lemma) level under visuospatial or verbal working memory (WM) load. At the phonological level, subject and object nouns were found to be activated before speech onset with concurrent visuospatial WM load, but only subject nouns were found to be activated with concurrent verbal WM load, indicating a reduced planning scope as a function of type of WM load (Experiment 1). By contrast, at the abstract-lexical level, subject and object nouns were found to be activated regardless of type of concurrent load (Experiment 2). In both experiments, sentence planning had a more detrimental effect on concurrent verbal WM task performance than on concurrent visuospatial WM task performance. Overall, our results suggest that advance planning at the phonological level is more affected by a concurrently performed verbal WM task than advance planning at the abstract-lexical level. Also, they indicate an overlap of resources allocated to phonological planning in speech production and verbal WM.

  8. Monitoring of geomorphological changes for planning reclamation work in coastal area of Karachi, Pakistan

    Science.gov (United States)

    Siddiqui, M. N.; Maajid, S.

    2004-01-01

    The coastal zones form an important segment and play a vital role in the economy of the country. The land-water interface comprising of coastal zone is modified all the time by oceanic currents, waves and tidal oscillations. The sediments are brought into the creeks from the erosion prone open coast beaches as well as through small rivers and inlets, and dispersed and deposited along the coast. Satellite Remote Sensing (SRS) due to its repetitive, multi-spectral and synoptic nature provides a unique view to recognize various features on land and sea. SRS techniques can be of great help in collection of continuous wave currents, wind, tides, suspended matter, shallow water area, wetlands, mangroves, mudflats and other coastal features and coastal changes, like land accretion or erosion. Therefore, a study has been undertaken to monitor geomorphological changes along the coast of Karachi using multi-temporal Landsat MSS and TM data from 1978 to 1998. SRS data were processed using interactive digital image processing/enhancement techniques like colour enhancement, Principal Component Analysis (PCA) and by Colour draping techniques and different enhanced products of the area have been prepared. The multi-temporal PC analysis results were integrated with each other and with navigational map of the area by GIS technique. The geomorphological changes occurring at the middle part of the coast of Karachi along Bundal and Buddo Islands and in Korangi-Phitti Creek area were delineated. The integrated techniques applied on multi-temporal SRS data in this study were found very useful for monitoring and mapping the land accretion and erosion processes. The analyses provided the old as well as the most recent data base of coastal environmental conditions of the study area, which may led for better understanding of coastal processes and help for planning reclamation work in this area.

  9. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  10. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  11. Third Program Plan for DOE's participation in the IEA Working Party on Energy-Conservation Research and Development

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    The Plan documents the projects currently being conducted by the working party in which DOE is participating and the projects proposed by DOE for consideration by other IEA member nations. Chapter 1 reviews current and planned DOE commitments to existing implementing agreements: buildings and community systems; energy conservation in building complexes; energy cascading; heat pumps with thermal storage; advanced heat pumps; combustion; heat transfer and heat exchangers; energy storage; cement manufacturer; and high-temperature materials for automotive propulsion systems. Chapter 2 reviews planned DOE commitments to new implementing agreements: combustion; pulp and paper; iron and steel; food processing; urban waste; and alcohol additives to fuel. Appendix A discusses the mechanisms for establishing implementing agreements and annexes. Appendix B lists working party members and Appendix C describes the evaluation methodology.

  12. Centre shares its success in family planning work with the NGOs in the SAARC region.

    Science.gov (United States)

    1995-01-01

    In March 1995, the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) and the government of Japan sponsored a 2-week international workshop on Family Planning Programmes of NGOs (nongovernmental organizations) in the SAARC Region (South Asia). The purpose of the workshop was to share experiences with family planning and reproductive health of the Matlab and the MCH-FP (maternal and child health-family planning) Extension Projects in urban and rural areas with family planning program managers from NGOs and policy and operations researchers. It also intended to examine those family planning and reproductive health projects of the NGOs in Bangladesh that fostered significant improvement of the national family planning and MCH program in Bangladesh. Participants were presented with effective family planning and MCH program design and strategies to strengthen improved management. The workshop emphasized the emerging norms of quality of care in family planning and reproductive health. NGOs initiated the concept of family planning in Bangladesh in 1953, so they are considered innovators. Accordingly, they are expected to develop designs and models for effective service delivery systems, training, management information system, IEC (information, education, and communication), community participation as well as to set social norms and values for small families. At the workshop, Bangladesh was offered as an example of how innovative NGO activities, sustained partnership between the NGOs and the government, and technical support from ICDDR,B lead to progress in family planning and MCH programs, despite the great poverty and economic stagnation. Contraceptive prevalence has increased from around 7% to almost 45% between 1977 and 1994.

  13. Presto 4.20 user's guide : addendum for shock capabilities.

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, Benjamin Whiting

    2011-06-01

    This is an addendum to the Presto 4.20 User's Guide to document additional capabilities that are available for use in the Presto{_}ITAR code that are not available for use in the standard version of Presto. Presto{_}ITAR is an enhanced version of Presto that provides capabilities that make it regulated under the U.S. Department of State's International Traffic in Arms Regulations (ITAR) export-control rules. This code is part of the Vivace product, and is only distributed to entities that comply with ITAR regulations. The enhancements primarily focus on material models that include an energy-dependent pressure response, appropriate for very large deformations and strain rates. Since this is an addendum to the standard Presto User's Guide, please refer to that document first for general descriptions of code capability and use. This addendum documents material models and element features that support energy-dependent material models.

  14. Sierra/SolidMechanics 4.22 user's guide : addendum for shock capabilities.

    Energy Technology Data Exchange (ETDEWEB)

    2011-10-01

    This is an addendum to the Sierra/SolidMechanics 4.22 User's Guide to document additional capabilities that are available for use in the Presto{_}ITAR code that are not available for use in the standard version of Sierra/SolidMechanics (Sierra/SM). Presto{_}ITAR is an enhanced version of Sierra/SM that provides capabilities that make it regulated under the U.S. Department of State's International Traffic in Arms Regulations (ITAR) export-control rules. This code is part of the Vivace product, and is only distributed to entities that comply with ITAR regulations. The enhancements primarily focus on material models that include an energy-dependent pressure response, appropriate for very large deformations and strain rates. Since this is an addendum to the standard Sierra/SolidMechanics User's Guide, please refer to that document first for general descriptions of code capability and use. This addendum documents material models and element features that support energy-dependent material models.

  15. How Best to Assess Students Taking Work Placements? An Empirical Investigation from Australian Urban and Regional Planning

    Science.gov (United States)

    Jackson, John; Jones, Martyn; Steele, Wendy; Coiacetto, Eddo

    2017-01-01

    Work placements (including internships) are common in urban and regional planning education but the relevant literature has largely overlooked their assessment and academic standards. To address this gap, the paper presents a study of this topic undertaken within the Australian context. The research involved systematically scoping the status of…

  16. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  17. Lessons from disaster: Creating a business continuity plan that really works.

    Science.gov (United States)

    Hatton, Tracy; Grimshaw, Eleanor; Vargo, John; Seville, Erica

    Business Continuity Planning (BCP) is well established as a key plank in an organisation's risk management process. But how effective is BCP when disaster strikes? This paper examines the experiences of organisations following the 2010-11 Canterbury, New Zealand earthquakes. The study finds that BCP was helpful for all organisations interviewed but more attention is needed on the management of societal and personal impacts; development of employee resilience, identification of effective crisis leaders; right-sizing plans and planning to seize opportunities post-disaster.

  18. Final work plan : targeted groundwater sampling and monitoring well installation for potential site reclassification at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-07-11

    This ''Work Plan'' outlines the scope of work for a targeted groundwater sampling investigation and monitoring well installation at Barnes, Kansas. This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with the intergovernmental agreement between the KDHE and the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA). Data resulting from the proposed work will be used to determine the hydraulic gradient near the former CCC/USDA facility, delineate the downgradient carbon tetrachloride plume, and determine additional monitoring requirements at Barnes. The overall goal is to establish criteria for monitoring leading to potential site reclassification. The proposed work will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The Farm Service Agency of the USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a ''Master Work Plan'' (Argonne 2002) to provide general guidance for all investigations at former CCC/USDA facilities in Kansas. The ''Master Work Plan'', approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Barnes.

  19. Miami Valley ITS : early deployment plan : recommended system architecture and technologies working paper

    Science.gov (United States)

    1997-08-01

    This system architecture paper will discuss proposed architectures for the four infrastructure oriented program areas defined by the project team and presented in the Strategic Deployment Plan (August 1997). This report will concentrate on defi...

  20. Working together on automated vehicle guidance AVG : preliminary business plan, abridged version.

    NARCIS (Netherlands)

    Awareness (ed.)

    1998-01-01

    This plan describes the questions which will have to be answered in the short term, and the action which need to be taken in a phased and structured manner to gain insight into the potential of automated vehicle guidance (AVG).

  1. Theme II Joint Work Plan -2017 Collaboration and Knowledge Sharing on Large-scale Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiaoliang [World Resources Inst. (WRI), Washington, DC (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-25

    This effort is designed to expedite learnings from existing and planned large demonstration projects and their associated research through effective knowledge sharing among participants in the US and China.

  2. A health plan work in progress: hospital-physician price and quality transparency.

    Science.gov (United States)

    Tynan, Ann; Liebhaber, Allison; Ginsburg, Paul B

    2008-08-01

    Responding to large employers' interest in greater health care price and quality transparency, health plans are developing consumer tools to compare price and quality information across hospitals and physicians, but the tools' pervasiveness and usefulness are limited, according to findings from the Center for Studying Health System Change's (HSC) 2007 site visits to 12 nationally representative metropolitan communities. Many large employers view price and quality transparency as key to a broader consumerism strategy, where employees take more responsibility for medical costs, lifestyle choices and treatment decisions. Some health plans believe providing price and quality information to enrollees is a competitive advantage, while others are skeptical about the benefits and are proceeding cautiously to avoid potential unintended consequences. Health plans are in various stages of making price information available to enrollees. Plans generally provide some type of price information on inpatient and outpatient procedures and services from data based on their own negotiated prices or through aggregated health plan claims data obtained through a vendor; few plans provide price information on services in physician offices. However, the information provided often lacks specificity about individual providers, and its availability is often limited to enrollees in specific geographic areas. Health plans generally rely on third-party sources to package publicly available quality information instead of using information gleaned from their own claims or other data. Health plans' ability to advance price and quality comparison tools to the point where a critical mass of consumers trust and use the information to choose physicians and hospitals will likely have considerable influence on the ultimate success of broader health consumerism efforts.

  3. Speech production and working memory: The influence of cognitive load on sentence planning

    OpenAIRE

    Klaus, Jana

    2015-01-01

    For the last four decades, psycholinguistic research has dealt with the question to what extent elements of simple sentences like “The monk read the book” are planned ahead both on the abstract-lexical and phonological processing level. While a number of studies have shown that all up to the final element can be activated on these two levels, empirical evidence on the flexibility of the respective planning scopes is inconsistent, and a systematic delineation of the influence of different fo...

  4. The association between psychosocial work environment, attitudes towards older workers (ageism) and planned retirement

    DEFF Research Database (Denmark)

    Thorsen, Sannie; Rugulies, Reiner; Løngaard, Katja

    2012-01-01

    The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account.......The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account....

  5. From Town Planning to Urban Design Work-The Dimensions to be Considered

    Directory of Open Access Journals (Sweden)

    Özcan Altaban

    2013-06-01

    organization and dynamic process of transformation and change. The different tissues often correspond with stages of the development of the city. In order to find a sense and direction within the complex phenomenon of the city, its elements can be analysed as part of three aspects. Physical structure of the city, functional structure of the city and the process that relates the physical form to its functions. Two types of physical structure appear as important. Thematic structure and non-thematic structure. Examples of thematic elements are the straight streets in a regular grid and the housing types in a residential area. Non- thematic structure consists of those elements and relations which tend to be different from typical ones and it makes references to larger areas than the tissue alone and relates and articulates different tissues together. Non-thematic elements can be classified in two types. Poles and tensions (or channels. Poles are the concentric points of the structure and agglomeration of poles will constitute a centre. Examples of poles are a church, a mosque or a public building. Tensions which are the linear dynamic links (channels such as boulevards or avenues. These elements can connect different part of the city. They also act as boundaries or limits of different areas that they support. Therefore, the non-thematic or primary structure that it is possible to define the unique and permanent structure of the city. In the last section of the paper an objective assessment or an evaluation is made about the critical and the anticipated issues on the change of scale from town planning to the lower level of urban design work. What are these steps which make somehow crucial expectations for the future of an urban area? 1. Firstly, it is the stage of production for a proper design which will direct the implementation process. 2. Secondly, the function of an urban project is to create an identity or a definition to the different urban sections will vary activities. 3

  6. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    Energy Technology Data Exchange (ETDEWEB)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.

  7. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  8. What leads to the expectation to return to work? Insights from a Theory of Planned Behavior (TPB) model of future work outcomes.

    Science.gov (United States)

    Dunstan, Debra A; Covic, Tanya; Tyson, Graham A

    2013-01-01

    This study used a Theory of Planned Behavior (TPB) model to identify the factors influencing the future work expectations and outcomes of employees with a musculoskeletal injury. Australians with a compensable work injury (N=174), mean age=43.7 years, 53.2% male, 48.3% back injury , and 34.2% unskilled. A TPB model of the target behavior 'working, or continuing to work … three months from now' was constructed. A questionnaire measuring the model's components was completed at baseline and three-months follow-up. The model met standard psychometric requirements. Attitude, Subjective Norm and Perceived Behavioral Control explained 76% of the variance in Behavioral Intention (R^{2}= 0.76, pR^{2}=0.51, p< 0.001; sensitivity=86.4%, specificity=71.2%). The strength of key influences on expectations varied according to employment status, but included the availability of modified duties, social aspects of work, the opinion of the treating doctor, co-worker support, pain, and functional limitations. The TPG is a useful model and conceptual framework for integrating the biopsychosocial determinantsof return to work (RTW) and identifying the influences on future work expectations and outcomes.

  9. The career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol.

    Science.gov (United States)

    Puryer, J; Patel, A

    2016-02-26

    Aim To investigate the career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol in 2015.Method Cross-sectional survey of 210 clinical undergraduates using an anonymous self-report questionnaire.Results The response rate was 79%. The majority (81.7%) were 'satisfied' or 'extremely satisfied' with their choice of career. The majority (78.7%) felt men and women are equally likely to succeed in dentistry, although 42.9% felt men had an advantage over women with regards to career success. The majority (81.6%) intend on working within general practice, 11.3% within hospital dental services and 2.1% within community dental services. The majority (70.5%) intend to specialise within dentistry. Only 1.8% of participants intend on providing only National Health Service (NHS) dental treatment whereas the 86.5% would provide both NHS and private dental treatment. Fifteen years after qualifying, 52.2% plan to work part-time, and 37.8% intend on retiring at the age of 60 or below. The majority (86.6%) felt that childcare should be shared equally between both parents. Female students intend to take more time out of their career to concentrate on childcare and felt that having a child would affect their career more than males.Conclusion The anticipated career plans, work-life balance and retirement plans of undergraduates change over time, and further research should be carried out to monitor future career intentions of dental students in order to help with dental workforce planning.

  10. Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-09-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  11. Walking the Torque: Proposed Work Plan for Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Electric motor-driven system is the largest single energy end use accounting for more than 40% of global electricity consumption. This paper sets out an ambitious but achievable target with the global work plan to improve the energy efficiency of electric motor-driven system by 10% to 15% based on the finding of working paper ''Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems (Waide et al., 2011)''. If governments commit to the proposed work plan immediately and maintain resourcing levels, this could be achieved by 2030 and it would be equivalent to reducing total global electricity use by around 5%. The proposed work plan of this paper is to align regulatory settings within a globally applicable scheme. The IEA believes this target can only be achieved through global co-operation leading to aligned national policy settings that countries can unlock the economies of scale that will result from using more energy efficient EMDS.

  12. Plan of research for integrated soil moisture studies. Recommendations of the Soil Moisture Working Group

    Science.gov (United States)

    1980-01-01

    Soil moisture information is a potentially powerful tool for applications in agriculture, water resources, and climate. At present, it is difficult for users of this information to clearly define their needs in terms of accuracy, resolution and frequency because of the current sparsity of data. A plan is described for defining and conducting an integrated and coordinated research effort to develop and refine remote sensing techniques which will determine spatial and temporal variations of soil moisture and to utilize soil moisture information in support of agricultural, water resources, and climate applications. The soil moisture requirements of these three different application areas were reviewed in relation to each other so that one plan covering the three areas could be formulated. Four subgroups were established to write and compile the plan, namely models, ground-based studies, aircraft experiments, and spacecraft missions.

  13. Spatial planning for fisheries in the Northern Adriatic: working toward viable and sustainable fishing

    DEFF Research Database (Denmark)

    Bastardie, Francois; Angelini, Silvia; Bolognini, Luca

    2017-01-01

    simultaneously in the area, and the need to minimize conflicts among them is also a social concern. We applied a spatially and temporally explicit fish and fisheries model to assess the impact of a suite of spatial plans suggested by practitioners that could reduce the pressure on the four demersal stocks...... in a unified framework. We contribute to the development of effective science-based inputs to facilitate policy improvement and better governance while evaluating trade-offs in fisheries management and marine spatial planning...

  14. University of West Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  15. University of Central Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  16. University of North Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  17. New College of Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  18. Florida A&M University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  19. Florida A&M University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  20. University of South Florida System Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  1. University of North Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  2. Florida Polytechnic University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  3. University of Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  4. Florida International University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  5. University of Central Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  6. University of Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. University of Central Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  8. Florida Gulf Coast University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  9. University of North Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  10. Florida State University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  11. University of Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  12. USF Sarasota-Manatee Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  13. Florida Atlantic University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  14. University of West Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  15. University of South Florida Tampa Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  16. Developing strategic marketing plans that really work a toolkit for public libraries

    CERN Document Server

    Kendrick, Terry

    2006-01-01

    Many government and other reports stress the need to get public libraries back into the lives of potential users, and this requires significant marketing effort on the part of the libraries. This book de-mystifies the marketing planning process and sets it in the context of modern public library services.

  17. A Sound Working Environment : Optimizing the Acoustic Properties of Open Plan Workspaces Using Parametric Models

    NARCIS (Netherlands)

    Vlaun, N.J.V.; van Waart, A.; Tenpierik, M.J.; Turrin, M.; Attar, Ramtin; Chronis, Angelos; Hanna, Sean; Turrin, Michela

    2016-01-01

    Optimizing the acoustic environment of open plan offices is a complex task due to the large number of design parameters that must be considered. In current practice, acoustic analysis – even in a simplified form – is not naturally integrated into the design process of office spaces. Applying digital

  18. Liquid effluents 1994 fiscal year work plan: WBS 1.2.2.1

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, F.L. Jr.

    1993-08-01

    The program mission is to manage current and future liquid effluent streams in a safe, responsible, cost effective and legally compliant manner. This is achieved through planning and integration, public and stakeholder interaction, definition of requirements for generators and provision of timely treatment, storage, disposal capability, and waste minimization of waste streams where applicable.

  19. Innovation Ltd. Boundary work in deliberative governance in land use planning

    NARCIS (Netherlands)

    Metze, T.A.P.

    2010-01-01

    In recent years, a surge in experiments with deliberative governance in land use planning in the Netherlands and around the world has occurred. In this form of governing, government interacts with businesses, non-governmental organizations and citizens to collaboratively solve problems. These more

  20. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  1. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    Good, D.E.

    1997-08-19

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline.

  2. The space shuttle payload planning working groups. Volume 10: Space technology

    Science.gov (United States)

    1973-01-01

    The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

  3. 21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

  4. Handbook for preparation of work breakdown structures. [project planning for NASA programs

    Science.gov (United States)

    1975-01-01

    Guidelines are presented for development of work breakdown structures (WBS) for NASA programs, projects, and contracts. The WBS were developed by starting with the end objective required and successively subdividing it into manageable components in terms of size and complexity, such as program, project, system, subsystems, components, tasks, subtasks, and work elements.

  5. Can Planning Time Compensate for Individual Differences in Working Memory Capacity?

    Science.gov (United States)

    Nielson, Katharine B.

    2014-01-01

    Language learners with high working memory capacity have an advantage, all other factors being equal, during the second language acquisition (SLA) process; therefore, identifying a pedagogical intervention that can compensate for low working memory capacity would be advantageous to language learners and instructors. Extensive research on the…

  6. Preservice and Inservice Teachers' Challenges in the Planning of Practical Work in Physics

    Science.gov (United States)

    Nivalainen, Ville; Asikainen, Mervi A.; Sormunen, Kari; Hirvonen, Pekka E.

    2010-01-01

    Practical work in school science plays many essential roles that have been discussed in the literature. However, less attention has been paid to how teachers learn the different roles of practical work and to the kind of challenges they face in their learning during laboratory courses designed for teachers. In the present study we applied the…

  7. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  8. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  9. Virtual reality surgical planning for maxillofacial distraction osteogenesis: the role of reverse engineering rapid prototyping and cooperative work.

    Science.gov (United States)

    Robiony, Massimo; Salvo, Iolanda; Costa, Fabio; Zerman, Nicoletta; Bazzocchi, Massimo; Toso, Francesco; Bandera, Camillo; Filippi, Stefano; Felice, Martina; Politi, Massimo

    2007-06-01

    The purpose of this article is the demonstration of virtual reality (VR) and rapid prototyping (RP) in surgical planning in maxillofacial surgery. The authors emphasize the role of reverse engineering (RE) and RP, suggesting a model of cooperative work, with the interaction of maxillofacial surgeons, radiologists, and engineers. Data acquisition is performed using computed tomography. The 3D model is the result of RE practices based on image segmentation, and the real model is produced via stereolithography. Virtual simulations are performed on the 3D model obtained from image segmentation. All these stages require the interaction and collaboration of various experts: maxillofacial surgeons, radiologists, and RE and RP experts. VR and stereolithography models represent a new technology to help the surgeon who has to work in cooperation with engineers and radiologists to improve the results in surgical planning of maxillofacial distraction. When performing the VR simulation, surgeons and engineers operate together in order to optimize the exploitation of the instruments available. Both VR and RP, with different and complementary advantages and limitations, can improve surgical planning activities and this is particularly effective when dealing with complex anatomical structures in maxillofacial surgery.

  10. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a).

  11. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a).

  12. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a).

  13. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a).

  14. 75 FR 7256 - Denali Commission Fiscal Year 2010 Draft Work Plan

    Science.gov (United States)

    2010-02-18

    ... State of Alaska telecommunications providers. The scope of work seeks to employ industry-standard GIS... other stakeholders. This interactive Web site will be critical to ensure accessibility of the broadband...

  15. Improving Work Force Management in the Department of State: The Program Planning and Budget Interface

    Science.gov (United States)

    1991-01-01

    general distribution. Publications of RAND do not necessarily reflect the opinions or policies of the sponsors of RAND research. Published 1991 by RAND...for manage- ment just outlined lead to a c. lideration of alternative work force management systems that define the range of choice for improvement...possible to define stand-alone improvements to the work force management system. In my opinion , all alternatives would be improved by installation of a

  16. Virtual reality based support system for layout planning and programming of an industrial robotic work cell.

    Science.gov (United States)

    Yap, Hwa Jen; Taha, Zahari; Dawal, Siti Zawiah Md; Chang, Siow-Wee

    2014-01-01

    Traditional robotic work cell design and programming are considered inefficient and outdated in current industrial and market demands. In this research, virtual reality (VR) technology is used to improve human-robot interface, whereby complicated commands or programming knowledge is not required. The proposed solution, known as VR-based Programming of a Robotic Work Cell (VR-Rocell), consists of two sub-programmes, which are VR-Robotic Work Cell Layout (VR-RoWL) and VR-based Robot Teaching System (VR-RoT). VR-RoWL is developed to assign the layout design for an industrial robotic work cell, whereby VR-RoT is developed to overcome safety issues and lack of trained personnel in robot programming. Simple and user-friendly interfaces are designed for inexperienced users to generate robot commands without damaging the robot or interrupting the production line. The user is able to attempt numerous times to attain an optimum solution. A case study is conducted in the Robotics Laboratory to assemble an electronics casing and it is found that the output models are compatible with commercial software without loss of information. Furthermore, the generated KUKA commands are workable when loaded into a commercial simulator. The operation of the actual robotic work cell shows that the errors may be due to the dynamics of the KUKA robot rather than the accuracy of the generated programme. Therefore, it is concluded that the virtual reality based solution approach can be implemented in an industrial robotic work cell.

  17. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  18. Huge natural gas reserves central to capacity work, construction plans in Iran

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-11

    Questions about oil production capacity in Iran tend to mask the country's huge potential as a producer of natural gas. Iran is second only to Russia in gas reserves, which National Iranian Gas Co. estimates at 20.7 trillion cu m. Among hurdles to Iran's making greater use of its rich endowment of natural gas are where and how to sell gas not used inside the country. The marketing logistics problem is common to other Middle East holders of gas reserves and a reason behind the recent proliferation of proposals for pipeline and liquefied natural gas schemes targeting Europe and India. But Iran's challenges are greater than most in the region. Political uncertainties and Islamic rules complicate long-term financing of transportation projects and raise questions about security of supply. As a result, Iran has remained mostly in the background of discussions about international trade of Middle Eastern gas. The country's huge gas reserves, strategic location, and existing transport infrastructure nevertheless give it the potential to be a major gas trader if the other issues can be resolved. The paper discusses oil capacity plans, gas development, gas injection for enhanced oil recovery, proposals for exports of gas, and gas pipeline plans.

  19. 78 FR 66040 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-11-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales... collection entitled HUD-Owned Real Estate-Sales Contract and Addendums (2502-0306). HUD will republish the...

  20. 78 FR 64145 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-10-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales... Collection: HUD-Owned Real Estate--Sales Contract and Addendums. OMB Approval Number: 2502-0306. Type of...

  1. 78 FR 57873 - 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-09-20

    ... Contract and Addendums AGENCY: Office of the Assistant Secretary for Housing, Office of Single Family Asset... hearing or speech impairments may access this number through TTY by calling the toll-free Federal Relay... impairments may access this number through TTY by calling the toll-free Federal Relay Service at (800) 877...

  2. Addendum to the AAPM's TG-51 protocol for clinical reference dosimetry of high-energy photon beams

    Science.gov (United States)

    McEwen, Malcolm; DeWerd, Larry; Ibbott, Geoffrey; Followill, David; Rogers, David W. O.; Seltzer, Stephen; Seuntjens, Jan

    2014-01-01

    An addendum to the AAPM's TG-51 protocol for the determination of absorbed dose to water in megavoltage photon beams is presented. This addendum continues the procedure laid out in TG-51 but new kQ data for photon beams, based on Monte Carlo simulations, are presented and recommendations are given to improve the accuracy and consistency of the protocol's implementation. The components of the uncertainty budget in determining absorbed dose to water at the reference point are introduced and the magnitude of each component discussed. Finally, the consistency of experimental determination of ND,w coefficients is discussed. It is expected that the implementation of this addendum will be straightforward, assuming that the user is already familiar with TG-51. The changes introduced by this report are generally minor, although new recommendations could result in procedural changes for individual users. It is expected that the effort on the medical physicist's part to implement this addendum will not be significant and could be done as part of the annual linac calibration. PMID:24694120

  3. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  4. What are the working mechanisms of a web-based workplace sitting intervention targeting psychosocial factors and action planning?

    Science.gov (United States)

    De Cocker, Katrien; De Bourdeaudhuij, Ilse; Cardon, Greet; Vandelanotte, Corneel

    2017-05-03

    Office workers demonstrate high levels of sitting on workdays. As sitting is positively associated with adverse health risks in adults, a theory-driven web-based computer-tailored intervention to influence workplace sitting, named 'Start to Stand,' was developed. The intervention was found to be effective in reducing self-reported workplace sitting among Flemish employees. The aim of this study was to investigate through which mechanisms the web-based computer-tailored intervention influenced self-reported workplace sitting. Employees (n = 155) participated in a clustered randomised controlled trial and reported socio-demographics (age, gender, education), work-related (hours at work, employment duration), health-related (weight and height, workplace sitting and physical activity) and psychosocial (knowledge, attitudes, self-efficacy, social support, intention regarding (changing) sitting behaviours) variables at baseline and 1-month follow-up. The product-of-coefficients test of MacKinnon based on multiple linear regression analyses was conducted to examine the mediating role of five psychosocial factors (knowledge, attitudes, self-efficacy, social support, intention). The influence of one self-regulation skill (action planning) in the association between the intervention and self-reported workplace sitting time was investigated via moderation analyses. The intervention had a positive influence on knowledge (p = 0.040), but none of the psychosocial variables did mediate the intervention effect on self-reported workplace sitting. Action planning was found to be a significant moderator (p workplace sitting only occurred in the group completing an action plan. Future interventions aimed at reducing employees' workplace sitting are suggested to focus on self-regulatory skills and promote action planning when using web-based computer-tailored advice. Clinicaltrials.gov NCT02672215 ; (Archived by WebCite at https://clinicaltrials.gov/ct2/show/NCT02672215 ).

  5. Ordinary risks and accepted fictions: how contrasting and competing priorities work in risk assessment and mental health care planning.

    Science.gov (United States)

    Coffey, Michael; Cohen, Rachel; Faulkner, Alison; Hannigan, Ben; Simpson, Alan; Barlow, Sally

    2017-06-01

    Communication and information sharing are considered crucial to recovery-focused mental health services. Effective mental health care planning and coordination includes assessment and management of risk and safety. Using data from our cross-national mixed-method study of care planning and coordination, we examined what patients, family members and workers say about risk assessment and management and explored the contents of care plans. Thematic analysis of qualitative research interviews (n = 117) with patients, family members and workers, across four English and two Welsh National Health Service sites. Care plans were reviewed (n = 33) using a structured template. Participants have contrasting priorities in relation to risk. Patients see benefit in discussions about risk, but cast the process as a worker priority that may lead to loss of liberty. Relationships with workers are key to family members and patients; however, worker claims of involving people in the care planning process do not extend to risk assessment and management procedures for fear of causing upset. Workers locate risk as coming from the person rather than social or environmental factors, are risk averse and appear to prioritize the procedural aspects of assessment. Despite limitations, risk assessment is treated as legitimate work by professionals. Risk assessment practice operates as a type of fiction in which poor predictive ability and fear of consequences are accepted in the interests of normative certainty by all parties. As a consequence, risk adverse options are encouraged by workers and patients steered away from opportunities for ordinary risks thereby hindering the mobilization of their strengths and abilities. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  6. Georgetown University generic integrated community energy system GU-ICES demonstration project. Modified work management plan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint. Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.

  7. Virtual reality based support system for layout planning and programming of an industrial robotic work cell.

    Directory of Open Access Journals (Sweden)

    Hwa Jen Yap

    Full Text Available Traditional robotic work cell design and programming are considered inefficient and outdated in current industrial and market demands. In this research, virtual reality (VR technology is used to improve human-robot interface, whereby complicated commands or programming knowledge is not required. The proposed solution, known as VR-based Programming of a Robotic Work Cell (VR-Rocell, consists of two sub-programmes, which are VR-Robotic Work Cell Layout (VR-RoWL and VR-based Robot Teaching System (VR-RoT. VR-RoWL is developed to assign the layout design for an industrial robotic work cell, whereby VR-RoT is developed to overcome safety issues and lack of trained personnel in robot programming. Simple and user-friendly interfaces are designed for inexperienced users to generate robot commands without damaging the robot or interrupting the production line. The user is able to attempt numerous times to attain an optimum solution. A case study is conducted in the Robotics Laboratory to assemble an electronics casing and it is found that the output models are compatible with commercial software without loss of information. Furthermore, the generated KUKA commands are workable when loaded into a commercial simulator. The operation of the actual robotic work cell shows that the errors may be due to the dynamics of the KUKA robot rather than the accuracy of the generated programme. Therefore, it is concluded that the virtual reality based solution approach can be implemented in an industrial robotic work cell.

  8. The characteristics of oncology social work in Australia: Implications for workforce planning in integrated cancer care.

    Science.gov (United States)

    Pockett, Rosalie; Peate, Michelle; Hobbs, Kim; Dzidowska, Monika; L Bell, Melanie; Baylock, Brandi; Epstein, Irwin

    2016-12-01

    To describe the demographics, professional characteristics, self-reported professional development needs and research involvement of oncology social workers in Australia and to describe perceived barriers to provision of quality psychosocial care. A cross-sectional online survey was administered to social workers working in the oncology field who were contacted through three professional organizations; the Australian Association of Social Workers, Oncology Social Work Australia and the Psycho-oncology Co-operative Research Group, the University of Sydney. A snowball recruitment method was adopted to maximize the sample size. Two thirds of respondents had over 10 years professional practice experience but with lesser experience in oncology settings. Twenty-eight percent had post-graduate qualifications. Professional development needs were reported as moderate or high by 68% of respondents. No association between professional needs and work setting was found. Years of experience in oncology practice and living in an urban area increased the likelihood of involvement in research. Barriers to psychosocial care included poor understandings of the social work role, time constraints and an inadequate number of social work positions. In this first Australian study of the social work oncology workforce, the results demonstrated active, well-qualified and experienced social workers providing frontline services to people with cancer and their caregivers in geographically diverse locations across Australia. Inadequate resources and a lack of integrated psychosocial care were identified as barriers to comprehensive cancer care. The need for Aboriginal and Torres Strait Islander social workers was identified as an urgent workforce priority. © 2016 John Wiley & Sons Australia, Ltd.

  9. Summary of some Recent Work on Financial Planning for Decommissioning of Nuclear Research Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lindskog, Staffan (Swedish Nuclear Power Inspectorate, Stockholm (Sweden)); Sjoeblom, Rolf (Tekedo AB, Nykoeping (Sweden))

    2008-06-15

    The new European Union Environmental Liability Directive (ELD) together with the new standard and the increased awareness of the implications of the statements on Environmental liabilities in the IFRS/IA high-light the need for appropriate planning for decommissioning including cost estimations and waste fund management. These new regulations and standards are in some respects more stringent than the strictly nuclear rules. Consequently, The Swedish Nuclear Power Inspectorate has sought communication with non-nuclear actors in the area, including the participation in the recent meeting Environmental Economics and Investment Assessment 11, 27-30 May, 2008, Cadiz, Spain. The present compilation of publications on decommissioning and associated cost calculations in Sweden was prompted by these contacts. The compilation comprises 14 reports published during the last four years

  10. Making Investments in Dryland Development Work: Participatory Scenario Planning in the Makanya Catchment, Tanzania

    Directory of Open Access Journals (Sweden)

    Elin I. Enfors

    2008-12-01

    Full Text Available The agro-ecosystems of semi-arid and dry sub-humid SSA are inherently dynamic. At this point in time they are also experiencing a series of complex social-ecological changes that make their future even more uncertain. To ensure that development investments made today in the small-scale farming systems that dominate these regions make sense also in a long-term perspective they should benefit the local communities over a range of potential futures. We applied a participatory scenario planning approach to a smallholder farming community in semi-arid Tanzania, exploring four alternative development trajectories for the area, to increase the robustness of current investments in small-scale water system technologies. We found that water system technologies will be important across a number of possible futures, but that the most relevant target of these innovations, e.g., staple- versus cash-crop production, or individual- versus community-managed systems, differs. We argue that building capacity for experimentation among farmers is key to upgrading their farming systems, as this will generate benefits over a range of alternative futures. Furthermore, we found it to be essential across a range of scenarios to analyze the system-level impact of proposed interventions for successful investments in water system technologies. We conclude that although the method presents some challenges, participatory scenario planning is a useful tool for integrating research and development projects in the larger context, asit increases the understanding of events and processes that may either challenge the project or provide opportunities for it.

  11. Project report: Experimental planning and verification of working fluids (WP 5)

    DEFF Research Database (Denmark)

    Babi, Deenesh Kavi

    Computer-aided molecular design (CAMD) helps in the reduction of experiments for the selection/design of optimal working fluids. In reducing the number of experiments, solutions obtain by trial and error is replaced by solutions that are based on mixture-process properties. In generating optimal...

  12. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  13. Comparison of Cognitive Change after Working Memory Training and Logic and Planning Training in Healthy Older Adults.

    Science.gov (United States)

    Goghari, Vina M; Lawlor-Savage, Linette

    2017-01-01

    Recent attention has focused on the benefits of cognitive training in healthy adults. Many commercial cognitive training programs are available given the attraction of not only bettering one's cognitive capacity, but also potentially preventing age-related declines, which is of particular interest to older adults. The issue of whether cognitive training can improve performance within cognitive domains not trained (i.e., far transfer) is controversial, with meta-analyses of cognitive training both supporting and falsifying this claim. More support is present for the near transfer (i.e., transfer in cognitive domain trained) of cognitive training; however, not in all studies. To date, no studies have compared working memory training to training higher-level processes themselves, namely logic and planning. We studied 97 healthy older adults above the age of 65. Healthy older adults completed either an 8-week web-based cognitive training program on working memory or logic and planning. An additional no-training control group completed two assessments 8-weeks apart. Participants were assessed on cognitive measures of near and far transfer, including working memory, planning, reasoning, processing speed, verbal fluency, cognitive flexibility, and creativity. Participants improved on the trained tasks from the first day to last day of training. Bayesian analyses demonstrated no near or far transfer effects after cognitive training. These results support the conclusion that performance-adaptive computerized cognitive training may not enhance cognition in healthy older adults. Our lack of findings could be due to a variety of reasons, including studying a cohort of healthy older adults that were performing near their cognitive ceiling, employing a training protocol that was not sufficient to produce a change, or that no true findings exist. Research suggests numerous study factors that can moderate the results. In addition, the role of psychological variables, such as

  14. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  15. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  16. Mathematical Addendum for ``Infrared Catastrophe for Nelson's Model" (mp_arc 03-512)

    CERN Document Server

    Hirokawa, M

    2003-01-01

    In [mp_arc 03-512], the author used the kernel $a(k)$ of annihilation operator of bosons to describe and prove several useful formulas such as the pull-through formula on ground states. So, it is somewhat formal in the light of mathematics. Indeed, it is no wonder some mathematicians think the arguments by the symbolical formulas with $a(k)$ are so formal that they are incredulous of the arguments because of the well-known difficulty on the domain of $a(k)$. Thus, in this addendum, we list the difficulty in Remark 1 first. In order to treat it, we restate the formulas by using the smeared annihilation operator $a(f)$, $f \\in L^{2}({\\bf R}^{3})$, instead of $a(k)$ and present mathematically rigorous proofs of them. To author's best knowledge, the ways to prove them have not appeared in literatures yet. In this addendum, we use the same notations as in [mp_arc 03-512].

  17. A social work plan to promote HIV testing: A social marketing approach.

    Science.gov (United States)

    Morgan-Siebe, J P

    2017-03-01

    Many people living with human immunodeficiency virus (HIV) do not know that they are infected. It is important for infected persons to get tested for HIV in order to be diagnosed and medically treated. HIV has no known cure, but it can be controlled and sometimes prevented with proper medical care. The social work profession has ideal positioning to be extraordinarily helpful in work that promotes HIV testing, leading to reducing then eliminating new HIV diagnoses. Social marketing interventions, along with audience segmenting are explained. Specific attention is given to two separate subjects-minority health disparities and impulsive and/or sensation seeking sex practices-to showcase the versatility of social marketing in the promotion of HIV testing. Further ideas about how social workers can participate in these interprofessional social marketing campaigns are provided.

  18. The City Image and the Local Public Administration: a Working Tool in Urban Planning

    Directory of Open Access Journals (Sweden)

    Marius Cristian NEACȘU

    2009-10-01

    Full Text Available  The goal of this study consist of identifyingand testing in operational terms the concept of cityimage in the decision-making processes, both asfar as the urban planning and the future policies oflocal and regional development are concerned or inthe management of public spaces. It is well-knownthe fact that the simple series of statistical dataand the models based upon them do not sketchout a complete image regarding the urban reality,the perception of habitants at a micro-scale levelabout habituation conditions, illustrated by thecity image, presenting itself as a barometer of thedysfunctionalities encountered in the city. Thus, thepractical implications of this concept based on anew vision in the philosophy of the managementof urban spaces are likely to be interestingenough. Using this tool in the policies and in theactivity of public administration, in urbanism etc.,complementarily to statistical analyses, shouldaccompany any type of local development policyin order to enhance life quality and to transmit acertain life style, well appreciated by the residentswhich should bestow the city distinctiveness anda particular status in the regional and nationalhierarchy. The conceptual scheme of this studyis based on three elements: theory (what doesthe city image represent?, method (how could wemap at a micro-scale level?, case study (whichare the results and the tests of the applicability inthe city of Ploieşti.

  19. Putting PhDs to Work: Career Planning for Today's Scientist

    Science.gov (United States)

    Hobin, Jennifer A.; Clifford, Philip S.; Dunn, Ben M.; Rich, Susan; Justement, Louis B.

    2014-01-01

    Individual development plans (IDPs) have been promoted nationally as a tool to help research trainees explore career opportunities and set career goals. Despite the interest in IDPs from a policy perspective, there is little information about how they have been used. The authors examined IDP awareness and use, the benefits of creating an IDP, and ways to facilitate its use by administering a survey to current or former postdoctoral researchers via the National Postdoctoral Association (NPA) and University of Alabama at Birmingham email lists; individuals belonging to Federation of American Societies for Experimental Biology member societies who mentored postdocs; and postdoctoral administrators at member institutions of the Association of American Medical Colleges and the NPA. Although most postdoctoral administrators (>80%) were familiar with IDPs, less than 50% of postdocs and only 20% of mentors were aware of IDPs. For those postdocs and mentors who reported creating an IDP, the process helped postdocs to identify the skills and abilities necessary for career success and facilitated communication between postdocs and their mentors. Despite the fact that creating an IDP benefits postdocs and mentors, IDP use will likely remain low unless institutions and research mentors encourage trainees to engage in this process. PMID:24591503

  20. Hanford fire department FY 99 annual work plan WBS 6.5.7

    Energy Technology Data Exchange (ETDEWEB)

    GOOD, D.E.

    1999-02-24

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

  1. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  2. Inhibition, flexibility, working memory and planning in autism spectrum disorders with and without comorbid ADHD-symptoms

    Directory of Open Access Journals (Sweden)

    Schmidt Martin H

    2008-01-01

    Full Text Available Abstract Background Recent studies have not paid a great deal of attention to comorbid attention-deficit/hyperactivity disorder (ADHD symptoms in autistic children even though it is well known that almost half of children with autism spectrum disorder (ASD suffer from hyperactivity, inattention and impulsivity. The goal of this study was to evaluate and compare executive functioning (EF profiles in children with ADHD and in children with ASD with and without comorbid ADHD. Methods Children aged 6 to 18 years old with ADHD (n = 20 or ASD (High-Functioning autism or Asperger syndrome with (n = 20 and without (n = 20 comorbid ADHD and a typically developing group (n = 20 were compared on a battery of EF tasks comprising inhibition, flexibility, working memory and planning tasks. A MANOVA, effect sizes as well as correlations between ADHD-symptomatology and EF performance were calculated. Age- and IQ-corrected z scores were used. Results There was a significant effect for the factor group (F = 1.55; dF = 42; p = .02. Post-hoc analysis revealed significant differences between the ADHD and the TD group on the inhibition task for false alarms (p = .01 and between the ADHD group, the ASD+ group (p = .03, the ASD- group (p = .02 and the TD group (p = .01 for omissions. Effect sizes showed clear deficits of ADHD children in inhibition and working memory tasks. Participants with ASD were impaired in planning and flexibility abilities. The ASD+ group showed compared to the ASD- group more problems in inhibitory performance but not in the working memory task. Conclusion Our findings replicate previous results reporting impairment of ADHD children in inhibition and working memory tasks and of ASD children in planning and flexibility abilities. The ASD + group showed similarities to the ADHD group with regard to inhibitory but not to working memory deficits. Nevertheless the heterogeneity of these and previous results shows that EF assessment is not useful for

  3. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  4. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Jacobsen, P.H.

    1997-09-23

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  5. Minister Peng stresses the necessity for improving the working style in family planning implementation.

    Science.gov (United States)

    1993-06-01

    China's State Counselor and Minister of the State Family Planning (FP) Commission is reported to have made suggestions on improving FP effectiveness to officials in Qianshan and Jinzhai counties of Anhui Province, in Hongya and Mingshan counties of Sichuan Province, and in Dezhau Prefecture and Tai'an City of Shandong Province. In Anhui Province, Minister Peng Peiyun emphasized the importance of FP at the grassroots level and the responsibility of providing education, publicity, and contraceptive services to each couple of childbearing age. Publicity is needed to popularize the advantages and necessity of deferred marriage, deferred childbearing, fewer and healthier births, and gender equality. In Sichuan, Minister Peng state that FP is important for economic development. Other benefits are an improved standard of living, an improvement in women's social status, the formation of healthier and happier families, and improvement in the quality of human resources. Minister Peng stressed that social reform could change existing habits and customs. Publicity should be specific to conditions in each province and include information on how to increase family income, scientific production skills, and good child-rearing practices. Contraceptive services should be available in every village, and quality must be improved. This means wider contraceptive choices, more concern for the day-to-day problems of families with one daughter, and improved training of FP technicians to increase safety and reliability. In Shandong Province, Minister Peng urged that quotas be retained, but the pressure should be reduced on subordinating departments. Targets for FP implementation can be attained when major departments cooperate with those on grass roots level. Requirements must be practical. All couples should be permitted to bear a second child after a birth interval of several years. Program quality can be improved by upgrading worker's skills and building a large group of qualified FP

  6. Taxonomy of marine micro-algae - An addendum

    Digital Repository Service at National Institute of Oceanography (India)

    Bhat, S.R.

    be the justification 2 ? The market growth is tremendous, but the area of safety cannot be overlooked. While the technology is still in its early years, research and development work that go into its safety should be worked out right now. The United States...

  7. New command centre of the Lech Power Works. Planning and execution of command and control technology

    Energy Technology Data Exchange (ETDEWEB)

    Marschall, J.

    1985-10-28

    On February 25, 1985 the Lech Electricity Works in Augsburg took into service their new control centre for the operational control of the entire maximum, high and low voltage networks. As the replacement for the now outpaced old control centre it was installed along the most modern lines under retention of the remote control substations. The total of eight combined operation process computer AEG 80-30 charaterise the scope of the network command technology, whereby in several subsectors completely new paths were trodden for the first time. So for example the design of light technology, the monitor display illumination and the graphical system Gradas which controls the medium voltage network, operation using digitizer and the operation telecommunications system. (orig.).

  8. Constructing a ladder of transnational partnership working in support of marine spatial planning: thoughts from the Irish Sea.

    Science.gov (United States)

    Kidd, Sue; McGowan, Lynne

    2013-09-15

    This paper adds to the growing body of literature on partnerships and Marine Spatial Planning (MSP) by constructing a ladder of transnational partnership working which can act as an aid to partnership development. The first part draws upon partnership working and co-management literature and identifies 5 levels of transnational partnership working: Information Sharing; Administration Sharing; Agreed Joint Rules; Combined Organisation; and Combined Constitution and illustrates what these might entail with reference to established maritime partnerships. The second part of the paper then explores how these generic levels may be used to structure transnational partnership development in a particular marine setting. This draws upon the outputs of two Irish Sea Transnational Partnership Working events which were funded by the UK's Economic and Social Research Council, and in particular on the exploration of motivations for collaboration which was a key point of discussion. In conclusion the paper considers the strengths and weaknesses of the ladder and how it may be enhanced and used more widely to better understand and analyse existing transnational partnership activity and guide the development of new transnational partnerships in support of MSP. Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. Maintenance and construction operations user service : an addendum to the ITS program plan

    Science.gov (United States)

    2001-01-26

    The primary purpose of this User Service document is to address the needs of the relevant stakeholders within the maintenance and construction operations community. Based on these needs, the MCO User Service further describes the services it should p...

  10. Maintenance & construction operations user service : an addendum to the ITS program plan

    Science.gov (United States)

    2001-01-26

    The Maintenance and Construction Operations User Service describes the need for integrating key activities. Generally, key Maintenance and Construction Operations (MCO) activities include monitoring, operating, maintaining, improving, and managing th...

  11. GREAT II Upper Mississippi River (Guttenberg, Iowa to Saverton, Missouri). Plan Formulation Addendum

    Science.gov (United States)

    1980-12-01

    and escape cover and breeding habitat. Species relying on this cover type include; ducks, coot, rails, bitterns, herons , egrets, numerous song bird...consequences of physical alterations to backwaters, using data from Burnt Pocket, Fountain City Bay and any other side channel alteration study. Dispose...GROUP RECOMMENDATION NUMBER: 3523 (3511) 2. RECOMMENDATION: Apply the physical, chemical and biological data from Burnt Pocket, Fountain City Bay

  12. 78 FR 53155 - Endangered and Threatened Wildlife and Plants; Recovery Plan for Phyllostegia hispida; Addendum...

    Science.gov (United States)

    2013-08-28

    ... threatened animals and plants is a primary goal of the Endangered Species Act (Act) (16 U.S.C. 1531 et seq... as the consequent vulnerability to extinction through deterministic or stochastic (chance) events...

  13. Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Marsh, J.D.; McCarthy, J.F.

    1994-01-01

    This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

  14. Final Bioventing Pilot Test Work Plan for Base Exchange Service Station Underground Storage Tank Area, Vandenberg Air Force Base, California. Part I

    National Research Council Canada - National Science Library

    1992-01-01

    This pilot test work plan presents the scope of an in situ enhanced biological degradation, or "bioventing", pilot test for treatment of gasoline- contaminated soils at the Base Exchange Service Station (BXSS...

  15. 1993 Work Plan : Assessment of the Effects of Organochlorine Pesticides, Mercury, and Arsenic Exposure Upon Kestrel Productivity, Nestling Growth, and Nestling Survival on Rocky Mountain Arsenal : April, 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This work plan aims to specifically answer questions pertaining to impacts upon fish and wildlife resources on the Rocky Mountain Arsenal, and to address contaminant...

  16. Zur Rolle von Plansprachen im terminologiewissenschaftlichen Werk von Eugen Wuster (The Role of Planned Languages in Eugen Wuster's Work on Terminology Science).

    Science.gov (United States)

    Blanke, Detlev

    1998-01-01

    Discusses the relationship between planned languages and specialized technical languages, with particular reference to Esperanto, and analyzes its significance for several aspects of Eugen Wuster's (the founder of terminology science) work. (Author/VWL)

  17. Simulation in Pre-departure Training for Residents Planning Clinical Work in a Low-Income Country

    Directory of Open Access Journals (Sweden)

    Kevin R. Schwartz

    2015-12-01

    Full Text Available Introduction: Increasingly, pediatric and emergency medicine (EM residents are pursuing clinical rotations in low-income countries. Optimal pre-departure preparation for such rotations has not yet been established. High-fidelity simulation represents a potentially effective modality for such preparation. This study was designed to assess whether a pre-departure high-fidelity medical simulation curriculum is effective in helping to prepare residents for clinical rotations in a low-income country. Methods: 43 pediatric and EM residents planning clinical rotations in Liberia, West Africa, participated in a simulation-based curriculum focused on severe pediatric malaria and malnutrition and were then assessed by survey at three time points: pre-simulation, post-simulation, and after returning from work abroad. Results: Prior to simulation, 1/43 (2% participants reported they were comfortable with the diagnosis and management of severe malnutrition; this increased to 30/42 (71% after simulation and 24/31 (77% after working abroad. Prior to simulation, 1/43 (2% of residents reported comfort with the diagnosis and management of severe malaria; this increased to 26/42 (62% after simulation and 28/31 (90% after working abroad; 36/42 (86% of residents agreed that a simulation-based global health curriculum is more useful than a didactic curriculum alone, and 41/42 (98% felt a simulator-based curriculum should be offered to all residents planning a clinical trip to a low-income country. Conclusion: High-fidelity simulation is effective in increasing residents’ self-rated comfort in management of pediatric malaria and malnutrition and a majority of participating residents feel it should be included as a component of pre-departure training for all residents rotating clinically to low-income countries.

  18. Planning benchmark study for SBRT of early stage NSCLC. Results of the DEGRO Working Group Stereotactic Radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Moustakis, Christos [University Muenster, Department of Radiation Oncology, Muenster (Germany); German CyberKnife Center, Soest (Germany); Blanck, Oliver [UKSH Universitaetsklinikum Schleswig Holstein, Department of Radiation Oncology, Kiel (Germany); Saphir Radiosurgery Center, Guestrow and Frankfurt, Frankfurt (Germany); Ebrahimi Tazehmahalleh, Fatemeh [University Muenster, Department of Radiation Oncology, Muenster (Germany); City Hospital Dessau, Dessau (Germany); Chan, Mark ka heng [UKSH Universitaetsklinikum Schleswig Holstein, Department of Radiation Oncology, Kiel (Germany); Ernst, Iris; Haverkamp, Uwe; Eich, Hans Theodor [University Muenster, Department of Radiation Oncology, Muenster (Germany); German CyberKnife Center, Soest (Germany); Krieger, Thomas [University of Wuerzburg, Department of Radiation Oncology, Wuerzburg (Germany); Duma, Marciana-Nona; Oechsner, Markus [Technical University of Munich, Department of Radiation Oncology, Klinikum rechts der Isar, Munich (Germany); Ganswindt, Ute; Heinz, Christian [Ludwig-Maximilians-University, Department of Radiation Oncology, Munich (Germany); Alheit, Horst; Blank, Hilbert [Radiationtherapy Distler, Bautzen (Germany); Nestle, Ursula; Wiehle, Rolf [University Medical Center Freiburg, Department of Radiation Oncology, Freiburg (Germany); Kornhuber, Christine; Ostheimer, Christian [University Halle, Department of Radiation Oncology, Halle (Germany); Petersen, Cordula [University Hospital Hamburg-Eppendorf, Hamburg (Germany); Pollul, Gerhard [University Mainz, Department of Radiation Oncology, Mainz (Germany); Baus, Wolfgang; Altenstein, Georg [University Hospital of Cologne, Cologne (Germany); Beckers, Eric; Jurianz, Katrin [Gamma Knife Center Krefeld, Krefeld (Germany); Sterzing, Florian [University Hospital Heidelberg, Heidelberg (Germany); Kretschmer, Matthias [Radiologische Allianz Hamburg, Hamburg (Germany); Seegenschmiedt, Heinrich; Maass, Torsten [Radiationtherapy and Cyberknife Center Hamburg, Hamburg (Germany); Droege, Stefan [Lung Clinic Hemer, Hemer (Germany); Wolf, Ulrich [University Leipzig, Department of Radiation Oncology, Leipzig (Germany); Schoeffler, Juergen [Radiationtherapy Department Boeblingen, Boeblingen (Germany); Guckenberger, Matthias [University Zurich, Department of Radiation Oncology, Zurich (Switzerland)

    2017-10-15

    The aim was to evaluate stereotactic body radiation therapy (SBRT) treatment planning variability for early stage nonsmall cell lung cancer (NSCLC) with respect to the published guidelines of the Stereotactic Radiotherapy Working Group of the German Society for Radiation Oncology (DEGRO). Planning computed tomography (CT) scan and the structure sets (planning target volume, PTV; organs at risk, OARs) of 3 patients with early stage NSCLC were sent to 22 radiotherapy departments with SBRT experience: each department was asked to prepare a treatment plan according to the DEGRO guidelines. The prescription dose was 3 fractions of 15 Gy to the 65% isodose. In all, 87 plans were generated: 36 used intensity-modulated arc therapy (IMAT), 21 used three-dimensional conformal radiation therapy (3DCRT), 6 used static field intensity-modulated radiation therapy (SF-IMRT), 9 used helical radiotherapy and 15 used robotic radiosurgery. PTV dose coverage and simultaneously kept OARs doses were within the clinical limits published in the DEGRO guidelines. However, mean PTV dose (mean 58.0 Gy, range 52.8-66.4 Gy) and dose conformity indices (mean 0.75, range 0.60-1.00) varied between institutions and techniques (p ≤ 0.02). OARs doses varied substantially between institutions, but appeared to be technique independent (p = 0.21). All studied treatment techniques are well suited for SBRT of early stage NSCLC according to the DEGRO guidelines. Homogenization of SBRT practice in Germany is possible through the guidelines; however, detailed treatment plan characteristics varied between techniques and institutions and further homogenization is warranted in future studies and recommendations. Optimized treatment planning should always follow the ALARA (as low as reasonably achievable) principle. (orig.) [German] Ziel war die Untersuchung der Variabilitaet der Bestrahlungsplanung der stereotaktischen Strahlentherapie (SBRT) fuer das nicht-kleinzellige Bronchialkarzinom (NSCLC) im

  19. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  20. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State`s dangerous waste (the state`s RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  1. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  2. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  3. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  4. On the bibliography of a late eighteenth-century German work on natural history and an early record of Leuciscus meidingeri Heckel, 1852 (Pisces, Cyprinidae) in the river system of the Upper Danube on 6th APRIL 1786

    NARCIS (Netherlands)

    Groot, de S.J.

    1972-01-01

    The bibliography of a hitherto inaccurately described anonymous eighteenth-century popular German work on natural history is given, dealing with mammals, birds, fishes, amphibians and reptiles. As an addendum to this work the publisher has given an engraving of an unknown fish from the river Lech,

  5. FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-05-01

    The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

  6. Hanford Tank Farms Vadose Zone, Addendum to the T Tank Farm Report

    Energy Technology Data Exchange (ETDEWEB)

    Spatz, Robert

    2000-07-01

    This addendum to the T Tank Farm Report (GJO-99-101-TARA, GJO-HAN-27) published in September 1999 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the T Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the T Tank Farm at the DOE Hanford Site in the state of Washington.

  7. Addendum to the Technical Design Report for the Upgrade of the ALICE Time Projection Chamber

    CERN Document Server

    The ALICE Collaboration

    2015-01-01

    This is the addendum to the TDR of the upgrade of the ALICE Time Projection Chamber (CERN-LHCC-2013-020 ; ALICE-TDR-016). The key objective of the upgrade is the replacement of the present MWPC-based readout chambers by detectors that allow continuous operation without active ion gating. In the TDR, we propose a solution that employs stacks of four Gas Electron Multipliers (GEMs) and demonstrate that it fulfills the design specifications, in particular in terms of intrinsic position resolution, energy resolution, and ion backflow. In this document we demonstrate with additional results from both detector R&D and simulations that the technological solution chosen in the TDR has sufficient safety margin for a successful campaign with the upgraded detector in RUN 3 and beyond.

  8. PAT-1 safety analysis report addendum author responses to request for additional information.

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Ruth F.; Schmale, David T.; Kalan, Robert J.; Akin, Lili A.; Miller, David Russell; Knorovsky, Gerald Albert; Yoshimura, Richard Hiroyuki; Lopez, Carlos; Harding, David Cameron; Jones, Perry L.; Morrow, Charles W.

    2010-09-01

    The Plutonium Air Transportable Package, Model PAT-1, is certified under Title 10, Code of Federal Regulations Part 71 by the U.S. Nuclear Regulatory Commission (NRC) per Certificate of Compliance (CoC) USA/0361B(U)F-96 (currently Revision 9). The National Nuclear Security Administration (NNSA) submitted SAND Report SAND2009-5822 to NRC that documented the incorporation of plutonium (Pu) metal as a new payload for the PAT-1 package. NRC responded with a Request for Additional Information (RAI), identifying information needed in connection with its review of the application. The purpose of this SAND report is to provide the authors responses to each RAI. SAND Report SAND2010-6106 containing the proposed changes to the Addendum is provided separately.

  9. Finite element analysis and simulation of welding - an addendum: a bibliography (1996-2001)

    Science.gov (United States)

    Mackerle, Jaroslav

    2002-05-01

    This paper gives a bibliographical review of the finite element methods applied to the analysis and simulation of welding processes. The bibliography is an addendum to the finite element analysis and simulation of welding: a bibliography (1976-96) published in Modelling Simul. Mater. Sci. Eng. (1996) 4 501-33. The added bibliography at the end of this paper contains approximately 550 references to papers and conference proceedings on the subject that were published in 1996-2001. These are classified in the following categories: modelling of welding processes in general; modelling of specific welding processes; influence of geometrical parameters; heat transfer and fluid flow in welds; residual stresses and deformations in welds; fracture mechanics and welding; fatigue of welded structures; destructive and non-destructive evaluation of weldments and cracks; welded tubular joints, pipes and pressure vessels/components; welds in plates and other structures/components.

  10. Hanford Tank Farms Vadose Zone, Addendum to the BX Tank Farm Report

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, A.W.

    2000-07-01

    This addendum to the BX Tank Farm Report (GJO-98-40-TARA, GJO-HAN-19) published in August 1998 incorporates the results of high-rate and repeat logging activities along with shape factor analysis of the logging data. A high-rate logging system was developed and deployed in the BX Tank Farm to measure cesium-137 concentration levels in high gamma flux zones where the spectral gamma logging system was unable to collect usable data because of high dead times and detector saturation. This report presents additional data and revised visualizations of subsurface contaminant distribution in the BX Tank Farm at the DOE Hanford Site in the state of Washington.

  11. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

  12. Financial planning working capital ventures using software «analyzer bdds» sold on the basis of selection of optimal bond portfolio

    Directory of Open Access Journals (Sweden)

    N.J. Timofeeva

    2011-05-01

    Full Text Available This article examines the financial planning of working capital organizations, in particular presented a software implementation of the algorithm analyzes the budget forecast working capital, identify and take advantage of temporarily free money using a model of a decision on the choice of the optimal bond portfolio, consistent with the free flow of liquidity of the enterprise.

  13. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  14. Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    1998-12-18

    This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

  15. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  16. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination.

  17. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination.

  18. FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-10-01

    This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

  19. Cellular Gauge Symmetry and the Li Organization Principle: A Mathematical Addendum. Quantifying energetic dynamics in physical and biological systems through a simple geometric tool and geodetic curves.

    Science.gov (United States)

    Yurkin, Alexander; Tozzi, Arturo; Peters, James F; Marijuán, Pedro C

    2017-12-01

    The present Addendum complements the accompanying paper "Cellular Gauge Symmetry and the Li Organization Principle"; it illustrates a recently-developed geometrical physical model able to assess electronic movements and energetic paths in atomic shells. The model describes a multi-level system of circular, wavy and zigzag paths which can be projected onto a horizontal tape. This model ushers in a visual interpretation of the distribution of atomic electrons' energy levels and the corresponding quantum numbers through rather simple tools, such as compasses, rulers and straightforward calculations. Here we show how this geometrical model, with the due corrections, among them the use of geodetic curves, might be able to describe and quantify the structure and the temporal development of countless physical and biological systems, from Langevin equations for random paths, to symmetry breaks occurring ubiquitously in physical and biological phenomena, to the relationships among different frequencies of EEG electric spikes. Therefore, in our work we explore the possible association of binomial distribution and geodetic curves configuring a uniform approach for the research of natural phenomena, in biology, medicine or the neurosciences. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Taking into account protective works in land-use planning for mountain torrential floods: state of the art of present French practices

    Directory of Open Access Journals (Sweden)

    Philippe Félix

    2016-01-01

    Full Text Available In 1995, a law stated a common regulatory natural risk zoning for French municipalities through a land-use planning procedure called Risk Prevention Plan (PPR. In mountain valleys and especially within torrential watersheds, considering protective structures in those plans is an actual concern. Those protections do have an effect on phenomena and modify hazard and risk levels. This paper gives an overview on how torrential protective works are taken into account in present risk prevention plans. To carry out this study, 53 recent risk prevention plans over 11 French mountain departments were selected and analyzed through a common analysis grid. Torrential protection works are taken into account in more than one third of analyzed plans. Protections mostly considered are dikes, bank protections, check-dams and sediment traps. Modalities of integration of these structures vary from one plan to another, influencing both hazard and regulatory zoning. Results also show a wide range of practices between departments and even inside them. Conclusions brought out enhance knowledge about actual practices which were not sufficiently known so far. Findings and new additional recommendations will be included in a future PPR methodological guide exclusively suited for torrential context, which is currently still missing.

  1. Final work plan : supplemental upward vapor intrusion investigation at the former CCC/USDA grain storage facility in Hanover, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-12-15

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In 2007, the CCC/USDA conducted near-surface soil sampling at 61 locations and also sampled indoor air at nine residences on or adjacent to its former Hanover facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. The results were submitted to the KDHE in October 2007 (Argonne 2007). On the basis of the results, the KDHE requested sub-slab sampling and/or indoor air sampling (KDHE 2007). This Work Plan describes, in detail, the proposed additional scope of work requested by the KDHE and has been developed as a supplement to the comprehensive site investigation work plan that is pending (Argonne 2008). Indoor air samples collected previously from four homes at Hanover were shown to contain the carbon tetrachloride at low concentrations (Table 2.1). It cannot be concluded from these previous data that the source of the detected carbon tetrachloride is vapor intrusion attributable to former grain storage operations of the CCC/USDA at Hanover. The technical objective of the vapor intrusion investigation described here is to assess the risk to human health due to the potential for upward migration of carbon tetrachloride and

  2. The Ontario nursing workload demonstration projects: rethinking how we measure, cost and plan the work of nurses.

    Science.gov (United States)

    Ferguson-Paré, Mary; Bandurchin, Annabelle

    2010-05-01

    In 2008 the Nursing Secretariat of Ontario's Ministry of Health and Long-Term Care formed a Nursing Workload Steering Committee to oversee the implementation of three demonstration projects with the objectives: to assess the feasibility of Health Outcomes for Better Information and Care (HOBIC) data as a measure of nursing workload, determine the indicators that best support nurse leaders to measure nursing work and make informed staffing decisions, and develop a model that predicts acute care nursing costs. Three HOBIC scales--activities of daily living (ADLs), continence and fatigue--explained a small amount of the variance in nurse judgment of the amount of nursing time patients require in the first 24 hours of care. Nurses in the study appreciated providing their professional judgment to help estimate the nursing work requirements of patients. The priority and secondary indicators most important for decision-making included medical severity of patients, environmental complexity, nurse experience, patient turnover, nurse-to-patient ratio, cognitive status, infection control, nurse vacancy, predictability of patient types, nursing interventions, patient volumes, co-morbidities, patient self-care abilities, physical and psychosocial functioning, unit type and medical diagnosis. A fairly robust model was developed using existing data sources to estimate nursing input into a patient's costs. The model explained between 69% and 80% of the variation in nursing costs for each patient. In order to effectively measure, plan and cost nursing, we need to determine what nursing is. In the future, recognition of nurses as knowledge workers will require us to consider the many patient and environmental factors that affect the ability of nurses to apply their professional judgment to care for patients.

  3. Comprehensive work plan for Building 3001 storage canal at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Comprehensive Work Plan describes the method of accomplishment to replace the shielding protection of the water in the canal with a controlled low strength material (CLSM) 4. The canal was used during the operation of the Oak Ridge Graphite Reactor in the 1940s and 1950s to transport spent fuel slugs and irradiated test materials from the reactor, under water to the hot cell in Building 3019 for further processing, packaging, and handling. After the reactor was shut down, the canal was used until 1990 to store some irradiated materials until they could be transferred to a Solid Waste Storage Area. This task has the following objectives and components: (1) minimize potential future risk to human health and the environment; (2) reduce surveillance and maintenance cost of the canal; (3) perform site preparation activities; (4) replace the water in the canal with a solid CLSM; (5) pump the water to the Process Waste Treatment System (PWTS) for further processing at the same rate that the CLSM is pumped under the water; (6) remove the water using a process that will protect the workers and the public in the visitors area from contamination while the CLSM is being pumped underneath the water; (7) painting a protective coating material over the CLSM after the CLSM has cured.

  4. Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented.

  5. FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-11-01

    This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

  6. Work plan and health and safety plan for Building 3019B underground storage tank at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Brown, K.S.; Landguth, D.C.

    1992-08-01

    As part of the Underground Storage Tank Program at the Department of Energy`s Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, this Health and Safety Plan has been developed for removal of the 110-gal leaded fuel underground storage tank (UST) located in the Building 3019B area at ORNL This Health and Safety Plan was developed by the Measurement Applications and Development Group of the Health and Safety Research Division at ORNL The major components of the plan follow: (1) A project description that gives the scope and objectives of the 110-gal tank removal project and assigns responsibilities, in addition to providing emergency information for situations occurring during field operations; (2) a health and safety plan in Sect. 15 for the Building 3019B UST activities, which describes general site hazards and particular hazards associated with specific tasks, personnel protection requirements and mandatory safety procedures; and (3) discussion of the proper form completion and reporting requirements during removal of the UST. This document addresses Occupational Safety and Health Administration (OSHA) requirements in 29 CFR 1910.120 with respect to all aspects of health and safety involved in a UST removal. In addition, the plan follows the Environmental Protection Agency (EPA) QAMS 005/80 (1980) format with the inclusion of the health and safety section (Sect. 15).

  7. Work plan and health and safety plan for Building 3019B underground storage tank at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Brown, K.S.; Landguth, D.C.

    1992-08-01

    As part of the Underground Storage Tank Program at the Department of Energy's Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, this Health and Safety Plan has been developed for removal of the 110-gal leaded fuel underground storage tank (UST) located in the Building 3019B area at ORNL This Health and Safety Plan was developed by the Measurement Applications and Development Group of the Health and Safety Research Division at ORNL The major components of the plan follow: (1) A project description that gives the scope and objectives of the 110-gal tank removal project and assigns responsibilities, in addition to providing emergency information for situations occurring during field operations; (2) a health and safety plan in Sect. 15 for the Building 3019B UST activities, which describes general site hazards and particular hazards associated with specific tasks, personnel protection requirements and mandatory safety procedures; and (3) discussion of the proper form completion and reporting requirements during removal of the UST. This document addresses Occupational Safety and Health Administration (OSHA) requirements in 29 CFR 1910.120 with respect to all aspects of health and safety involved in a UST removal. In addition, the plan follows the Environmental Protection Agency (EPA) QAMS 005/80 (1980) format with the inclusion of the health and safety section (Sect. 15).

  8. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  9. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.

  10. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  11. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  12. Issues for Language Planning in Australia. Linguistic Communications: Working Papers of the Linguistic Society of Australia, No. 16.

    Science.gov (United States)

    Kaldor, Susan

    While much attention has been given to the language problems of newly developing nations and to the various phases of planned language development such as graphization, standardization and modernization, not enough attention has been given to language planning that would serve the needs of minority groups in nations such as Australia where the…

  13. Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: Project Introduction and First Year Work Plan

    Science.gov (United States)

    Skiner, J. A., Jr.; Rogers, A. D.; Seelos, K. D.

    2009-01-01

    The highland-lowland boundary (HLB) of Mars is interpreted to be a complex tectonic and erosional transition that may hold evidence for past geologic processes and environments. The HLB-abutting margin of the Libya Montes and the interbasin plains of northern Tyrrhena Terra display an exceptional view of the earliest to middle history of Mars that has yet to be fully characterized. This region contains some of the oldest exposed materials on the Martian surface as well as aqueous mineral signatures that may be potential chemical artifacts of early highland formational processes. However, a full understanding of the regions geologic and stratigraphic evolution is remarkably lacking. Some outstanding questions regarding the geologic evolution of Libya Montes and northern Tyrrhena Terra in-clude: Does combining geomorphology and composition advance our understanding of the region s evolution? Can highland materials be subdivided into stratigraphically discrete rock and sediment sequences? What do major physiographic transitions imply about the balanced tectonism, climate change, and erosion? Where is the erosional origin and what is the post-depositional history of channel and plains units? When and in what types of environments did aqueous mineral signatures arise? This abstract introduces the geologic setting, science rationale, and first year work plan of a recently-funded 4-year geologic mapping proposal (project year = calendar year). The objective is to delineate the geologic evolution of Libya Montes and northern Tyrrhena Terra at 1:1M scale using both classical geomorphological and compositional mapping techniques. The funded quadrangles are MTMs 00282, -05282, -10282, 00277, -05277, and -10277.

  14. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  15. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  16. Behavioral Determinants as Predictors of Return to Work After Long-Term Sickness Absence : An Application of the Theory of Planned Behavior

    NARCIS (Netherlands)

    Brouwer, Sandra; Krol, Boudien; Reneman, Michiel F.; Bultmann, Ute; Franche, Renee-Louise; van der Klink, Jac J. L.; Groothoff, Johan W.

    Background The aim of this prospective, longitudinal cohort study was to analyze the association between the three behavioral determinants of the theory of planned behavior (TPB) model-attitude, subjective norm and self-efficacy-and the time to return-to-work (RTW) in employees on long-term sick

  17. Validation of the French version of the Pittsburgh Sleep Quality Index Addendum for posttraumatic stress disorder

    Science.gov (United States)

    Ait-Aoudia, Malik; Levy, Pierre P.; Bui, Eric; Insana, Salvatore; de Fouchier, Capucine; Germain, Anne; Jehel, Louis

    2013-01-01

    Background Sleep disturbances are one of the main complaints of patients with trauma-related disorders. The original Pittsburgh Sleep Quality Index Addendum for PTSD (PSQI-A) is self-report instrument developed to evaluate posttraumatic stress disorder (PTSD)-specific sleep disturbances in trauma-exposed individuals. However, to date, the PSQI-A has not yet been translated nor validated in French. Objective The present study aims to: a) translate the PSQI-A into French, and b) examine its psychometric properties. Method Seventy-three adult patients (mean age=40.3 [SD=15.0], 75% females) evaluated in a specialized psychotraumatology unit completed the French versions of the PSQI-A, Pittsburgh Sleep Quality Index (PSQI), Hospital Anxiety and Depression Scale (HADS), and Impact Event Scale-Revised (IES-R). Results The French version of the PSQI-A showed satisfactory internal consistency, inter-item correlations, item correlations with the total score, convergent validity with PTSD and anxiety measures, and divergent validity with a depression measure. Conclusion Our findings support the use of the French version of the PSQI-A for both clinical care and research. The French version of the PSQI-A is an important addition to the currently available instruments that can be used to examine trauma-related sleep disturbances among French-speaking individuals. PMID:24044071

  18. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shanklin

    2006-06-01

    This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

  19. Addendum to the remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 ponds, boneyard/burnyard, oil landfarm, sanitary landfill I, and the burial grounds, including oil retention ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. main text

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    The BCV OU 1 location poses two problems that Data Quality Objectives will address: (1) whether the wastes and soil contamination pose a risk to human health or the environment now or in the future and (2) if the wastes and contamination do pose a risk, what feasible alternatives exist for reducing the risk to acceptable levels?

  20. Analysis of Biophysical, Optical and Genetic Diversity of DoD Coral Reef Communities Using Advanced Fluorescence and Molecular Biology Techniques (Addendum)

    Science.gov (United States)

    2011-08-01

    Coral Reef Communities Using Advanced Fluorescence and Molecular Biology Techniques 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...ADDENDUM TO THE FINAL REPORT Analysis of Biophysical, Optical and Genetic Diversity of DoD Coral Reef Communities Using Advanced Fluorescence...Disease iv Keywords Environmental monitoring, benthic ecosystems, coral reefs , metal toxicity, petroleum toxicity, natural and

  1. The detection and settlement of VAT fraud in four countries : Addendum to the report value-added tax fraud in the European Union

    NARCIS (Netherlands)

    Aronowitz, A.A.; Laagland, D.C.G.; Paulides, G.

    1996-01-01

    This addendum to the report 'Value-added tax fraud in the European Union' gives additional information on the detection and settlement of VAT fraud in Belgium, Germany, the United Kingdom and the Netherlands. See link to the report at: More information.

  2. Addendum to "Increasing Early Childhood Educators' Use of Communication-Facilitating and Language-Modelling Strategies: Brief Speech and Language Therapy Training"

    Science.gov (United States)

    McDonald, David; Proctor, Penny; Gill, Wendy; Heaven, Sue; Marr, Jane; Young, Jane

    2015-01-01

    The purpose of this addendum is to include within our discussion the findings of Girolametto et al. (2007), a randomized controlled trial of Teacher Talk training, an adapted version of Learning Language and Loving It (LLLI) (Weitzman and Greenberg, 2002). Teacher Talk does not include the coaching and video feedback elements of LLLI. Girolametto…

  3. [Software solution for work planning, monitoring and analysis in medical institutions and its appliance in information system of the medical center "Dom Zdravlja Nish"].

    Science.gov (United States)

    Becić, B; Pantić, D; Ristić, V

    1995-09-01

    Economic category of the given services in medical institutions is getting more important. The software solution explained in this paper offers efficient planning of services that could be given in medical institutions. The software module also covers plan realization monitorin. Large number of statistic reports enables detailed analysis of plan realization in required period, using hierarchical structure of institution organizacion and given services. Module offeres reports for monitoring every employee, as well as categories of insured persons, and kinds of medical protection, etc. Using number and price of services, economic side of work can be seen, for every employed person or whole institution. This software module is realized with ORACLE RDBMS in distributed UNIX ambient with LAN/WAN based on INTERNET TCP/IP.

  4. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  5. Addendum to: Centrality dependence of high-p T D-meson suppression in Pb-Pb collisions at s N N = 2.76 $$ \\sqrt{{\\mathrm{s}}_{\\mathrm{NN}}}=2.76 $$ TeV

    OpenAIRE

    Adam, J.; Adamová, D.; Aggarwal, M.; Aglieri Rinella, G.; Agnello, M.; Agrawal, N.; Ahammed, Z.; Ahn, S.; Aimo, I.; Aiola, S.; Ajaz, M.; Akindinov, A.; Alam, S.; Aleksandrov, D.; Alessandro, B.

    2017-01-01

    This is an addendum to the article JHEP 11 (2015) 205 [1]. The figures 3 (right), 4 (right) and 5 are updated with published results on non-prompt J/ ψ -meson production from the CMS collaboration [2].

  6. Super-GCA connection with tensionless strings: Addendum to “Super-GCA from N=(2,2 super-Virasoro” [Phys. Lett. B 754 (2016 195–200

    Directory of Open Access Journals (Sweden)

    Ipsita Mandal

    2016-09-01

    Full Text Available In this addendum, we consider the connection between certain 2d super-GCA, obtained from the parametric contractions of 2d SCFTs, which can describe the constraint algebra of null spinning strings.

  7. University of South Florida St. Petersburg Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  8. University of South Florida Sarasota-Manatee Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  9. University of South Florida St. Petersburg Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  10. University of South Florida--System Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  11. A-Gendering Skill. Conversations around Women, Work and Skill: An Australian Perspective. EEE703 Project Development Plan 2.

    Science.gov (United States)

    Butler, Elaine, Ed.; Brown, Mike, Ed.

    These 12 papers are part of the study materials for the one-semester distance education unit, Project Development Plan 2, in the Open Campus Program at Deakin University (Australia). They examine the breadth and depth of the actions and debates around the social construction of skill and the critical role played by the concept of skill in the…

  12. Working with knowledge at the science/policy interface: a unique example from developing the Tongass Land Management Plan.

    Science.gov (United States)

    Charles G. Shaw; Fred H. Everest; Douglas N. Swanston

    2000-01-01

    An innovative, knowledge-based partnership between research scientists and resource managers in the U.S. Forest Service provided the foundation upon which the Forest Plan was developed that will guide management on the Tongass National Forest for the next 10-15 years. Criteria developed by the scientists to evaluate if management decisions were consistent with the...

  13. Hanford tanks initiative work plan -- subsurface characterization to support the closure-readiness demonstration for tank 241-AX-104

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D.B.

    1996-09-27

    This document presents a plan for subsurface investigation near 241-AX-104 Single-Shell tank. Objectives of the investigation are soil sampling and analyses (physical and chemical), local stratigraphic correlation, groundwater background characterization, and geophysical surveys. The primary purpose of the investigation is to supply physical and hydraulic properties for numerical modeling of vadose zone flow and transport.

  14. Demographic change and the drivers of future migration into Europe. Approach, methodology and work plan of the JRC/IIASA Centre of Expertise on Population and Migration

    OpenAIRE

    Lutz, W.; Belanger, A.

    2017-01-01

    This document describes the research approach, methodology and work plan of the Centre of Expertise on Population and Migration that was established in 2016 as a collaboration been IIASA (International Institute for Applied Systems Analysis) and JRC (Joint Research Centre of the European Commission). This collaboration is scheduled for three years and each side provides the funding of five post-doctoral researchers. Team members will be jointly supervised and be stationed in Ispra and at IIAS...

  15. How team working influences discharge planning from hospital: a study of four multi-disciplinary teams in an acute hospital in England.

    Science.gov (United States)

    Pethybridge, Jo

    2004-02-01

    A research project was carried out to critically explore and analyse what factors in an interdisciplinary/multidisciplinary context inhibited or promoted decision-making for the discharge planning process for patients returning home from an acute hospital in London. This was done through observations, informal interviewing and focus groups held on two wards and with the supported discharge rehabilitation team. Data were analysed and a conceptual framework developed, highlighting the important factors namely: leadership, team working and communication, affected by behaviours, feelings and resources, including environmental as well as personnel resources. Further analysis of the data suggested that leadership, which acted as a nerve centre for pivoting information, orchestrating and representing the team, and ensuring good outcomes were all important for decision-making in discharge planning. Team working, based on sharing, agreeing responsibilities, roles and boundaries, developing trust, learning together were all important factors. The study showed that good team working and leadership are vital to the success of effective discharge planning, but these aspects are rarely investigated and few resources are targeted on improving them.

  16. Anxiety Disorders Interview Schedule-Autism Addendum: Reliability and Validity in Children With Autism Spectrum Disorder.

    Science.gov (United States)

    Kerns, Connor Morrow; Renno, Patricia; Kendall, Philip C; Wood, Jeffrey J; Storch, Eric A

    2017-01-01

    Assessing anxiety in autism spectrum disorder (ASD) is inherently challenging due to overlapping (e.g., social avoidance) and ambiguous symptoms (e.g., fears of change). An ASD addendum to the Anxiety Disorders Interview Schedule-Child/Parent, Parent Version (ADIS/ASA) was developed to provide a systematic approach for differentiating traditional anxiety disorders from symptoms of ASD and more ambiguous, ASD-related anxiety symptoms. Interrater reliability and convergent and discriminant validity were examined in a sample of 69 youth with ASD (8-13 years, 75% male, IQ = 68-143) seeking treatment for anxiety. The parents of participants completed the ADIS/ASA and a battery of behavioral measures. A second rater independently observed and scored recordings of the original interviews. Findings suggest reliable measurement of comorbid (intraclass correlation = 0.85-0.98, κ = 0.67-0.91) as well as ambiguous anxiety-like symptoms (intraclass correlation = 0.87-95, κ = 0.77-0.90) in children with ASD. Convergent and discriminant validity were supported for the traditional anxiety symptoms on the ADIS/ASA, whereas convergent and discriminant validity were partially supported for the ambiguous anxiety-like symptoms. Results provide evidence for the reliability and validity of the ADIS/ASA as a measure of traditional anxiety categories in youth with ASD, with partial support for the validity of the ambiguous anxiety-like categories. Unlike other measures, the ADIS/ASA differentiates comorbid anxiety disorders from overlapping and ambiguous anxiety-like symptoms in ASD, allowing for more precise measurement and clinical conceptualization. Ambiguous anxiety-like symptoms appear phenomenologically distinct from comorbid anxiety disorders and may reflect either symptoms of ASD or a novel variant of anxiety in ASD.

  17. Anxiety Disorders Interview Schedule – Autism Addendum: Reliability and Validity in Children with Autism Spectrum Disorder

    Science.gov (United States)

    Kerns, Connor Morrow; Renno, Patricia; Kendall, Philip C.; Wood, Jeffrey J.; Storch, Eric A.

    2017-01-01

    Objective Assessing anxiety in autism spectrum disorder (ASD) is inherently challenging due to overlapping (e.g., social avoidance) and ambiguous symptoms (e.g., fears of change). An ASD addendum to the Anxiety Disorders Interview Schedule–Child/Parent, Parent Version (ADIS/ASA) was developed to provide a systematic approach for differentiating traditional anxiety disorders from symptoms of ASD and more ambiguous, ASD-related anxiety symptoms. Method Inter-rater reliability and convergent and discriminant validity were examined in a sample of 69 youth with ASD (8–13 years, 75% male, IQ:68–143) seeking treatment for anxiety. The parents of participants completed the ADIS/ASA and a battery of behavioral measures. A second rater independently observed and scored recordings of the original interviews. Results Findings suggest reliable measurement of comorbid (ICC=0.85–0.98; κ =0.67–0.91) as well as ambiguous anxiety-like symptoms (ICC=0.87–95, κ=0.77–0.90) in children with ASD. Convergent and discriminant validity were supported for the traditional anxiety symptoms on the ADIS/ASA, whereas convergent and discriminant validity were partially supported for the ambiguous anxiety-like symptoms. Conclusions Results provide evidence for the reliability and validity of the ADIS/ASA as a measure of traditional anxiety categories in youth with ASD, with partial support for the validity of the ambiguous anxiety-like categories. Unlike other measures, the ADIS/ASA differentiates comorbid anxiety disorders from overlapping and ambiguous anxiety-like symptoms in ASD, allowing for more precise measurement and clinical conceptualization. Ambiguous anxiety-like symptoms appear phenomenologically distinct from comorbid anxiety disorders and may reflect either symptoms of ASD or a novel variant of anxiety in ASD. PMID:27925775

  18. Intention to Work with Individuals with Dual Diagnosis: Testing the Theory of Planned Behavior among Students from Various Professions

    Science.gov (United States)

    Werner, Shirli

    2012-01-01

    Providing holistic care to individuals with the dual diagnosis (DD) of intellectual disability and mental illness is a challenging task that requires the work of various health care specialists. The aim of the current study was to examine the intentions of students from various fields to work with individuals with DD. A questionnaire was completed…

  19. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

  20. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  1. The hard work of preserving the value of doctoral education. The case of the Ph.D. in Regional and Urban Planning at Sapienza, Rome

    Directory of Open Access Journals (Sweden)

    Valentina Alberti

    2015-12-01

    Full Text Available The Ph.D. programme in Regional and Urban Planning at Sapienza (University of Rome underwent some significant changes during the last thirty years. A large part of these changes was requested by mutations in the higher level education system and in the planning discipline at the European scale. During last decades, indeed, the doctorate became the third level of higher education and it no longer qualified researchers only for academia, but for a broader labour market. Moreover, the planning discipline developed a common language between the different European schools. Despite changes, the value that the doctorate represents for education of researchers seems to be unchanged. This work aims at visualizing some possible problems in pursuing the value of doctoral education. The purpose is to identify some events that can help or contrast the vale that each doctorate should be able to provide. Four sections structure the article. The first part presents the most significant background transformations that promoted changes in doctoral education. The second part offers some elements to define the value of a Ph.D. The third part highlights discrepancies between purposes and outcomes in promoting the value of the doctorate in the evolution of the Ph.D. in Regional and Urban Planning of Sapienza. The last part collects principal issues linked to the pursuing of the value of a doctorate, and identifies the role of the “intellectual out of academia” as one of the foremost concern to preserve the value of the doctorate training.

  2. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    Energy Technology Data Exchange (ETDEWEB)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH), Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.

  3. ANALYSIS AND DESIGN FOR AN WORKING PLAN COORDINATION USING JADE MULTI-AGENT SYSTEM IN DECISION MAKING PROCES

    Directory of Open Access Journals (Sweden)

    Perşa Eugen Claudiu

    2011-01-01

    Full Text Available Systems composed of interacting autonomous agents offer new ways in developing applicationsin complex domains. Using a multi-agent platform to coordinate an information systemis an appropriate choice because of the complexity and dynamism required. Data fluxof an economical system is generally built to follow document movements. On the otherhand, decision making and disseminating processes are complex and must be flexible andnetwork distributed. Our goal is to build a Decision Support System (DSS using JADEMulti-agent system. This paper reflects a small part of this goal so we are emphasizing theworking plan coordination.

  4. The evaluation and planning method of Spanish sport and physical activity instructors: A comparative study across gender, age, level of studies and work experience.

    Science.gov (United States)

    Bernabé, Beatriz; González-Rivera, María Dolores; Campos-Izquierdo, Antonio

    2017-01-01

    The purpose of this study is to investigate the planning and the evaluation of Spanish sport and physical activity instructors as well as to analyze and compare the two variables in terms of their gender, age, level of studies and work experience. This research falls inside the quantitative type methodology of descriptive cut through standardized interview using the standardized questionnaire: "Human resources of sport and physical activity". It analyses the situation and performance of people working in functions of sport and physical activity. The questionnaire was completed by 600 sport and physical activity instructors from Spain. Key results revealed that 48.0% of them plan their classes and 58.17% assess. The study also found male university graduates between the ages of 60 and 70, with 10 years of experience or more spend the most time on planning and assessment. Daily classroom observation was the tool which physical activity and sport instructors used the most, followed by execution tests. The lesser used tools were theoretical knowledge exams, diaries and the personally created tests, across all of the variables.

  5. The evaluation and planning method of Spanish sport and physical activity instructors: A comparative study across gender, age, level of studies and work experience.

    Directory of Open Access Journals (Sweden)

    Beatriz Bernabé

    Full Text Available The purpose of this study is to investigate the planning and the evaluation of Spanish sport and physical activity instructors as well as to analyze and compare the two variables in terms of their gender, age, level of studies and work experience. This research falls inside the quantitative type methodology of descriptive cut through standardized interview using the standardized questionnaire: "Human resources of sport and physical activity". It analyses the situation and performance of people working in functions of sport and physical activity. The questionnaire was completed by 600 sport and physical activity instructors from Spain. Key results revealed that 48.0% of them plan their classes and 58.17% assess. The study also found male university graduates between the ages of 60 and 70, with 10 years of experience or more spend the most time on planning and assessment. Daily classroom observation was the tool which physical activity and sport instructors used the most, followed by execution tests. The lesser used tools were theoretical knowledge exams, diaries and the personally created tests, across all of the variables.

  6. Finite element analysis of deep wide-flanged pre-stressed girders to understand and control end cracking : [work plan].

    Science.gov (United States)

    2011-01-01

    Project -- Work Approach: The first phase will examine the critical problem of controlling cracking in the 82W : girders. This complex problem is controlled by effects of concentrated stresses, force : transfer from pre-tensioning strand, inelastic b...

  7. [Temporary Disability Pension from the Perspective of the Individual: Self-Reported Physical and Mental Health, Medical Rehabilitation, and Return to Work Plans].

    Science.gov (United States)

    Zschucke, E; Hessel, A; Lippke, S

    2016-08-01

    To assess health and psychosocial variables as well as return-to-work (RTW) plans in people with long-term illness-related absence from work in Germany. Structured telephone interviews with N=452 persons receiving a temporary disability pension (53.3% female, mean age 50.3 years). Participants reported high levels of multimorbidity and physical and mental complaints. The majority however stated to intend or even to have prepared their RTW. This intention was correlated with age and the duration of the temporary disability pension, but not with gender, number or type of diseases, or current subjective health status. Our results indicate a large intention-behavior gap which needs to be addressed in studies, but also in rehabilitation and return-to-work interventions. © Georg Thieme Verlag KG Stuttgart · New York.

  8. Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project: Phytoremediation Along the 100-N Columbia River Riparian Zone

    Energy Technology Data Exchange (ETDEWEB)

    Ainsworth, Calvin C.

    2006-04-30

    The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, and continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.

  9. An Ergonomic Evaluation of the Illumination Level and the Management Plan to Improve the Working Environment of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Kwang Hyeon; Lee, Yong Hee [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2011-10-15

    Illumination in the working environment is one of the crucial factors that affect worker's psychological status as well as the physiological condition according to each task. Sometimes it affects the results of worker's cognitive, perceptual work performance. In particular, illumination may become a triggering factor to human errors in visual tasks due to visual fatigue through direct influence of vision in NPPs. Illumination includes several visual conditions such as uniformity factor, light distribution, glare, SPD (Surge Protector Device), flicker, illumination system, daylight and window control, in addition to the simple physical aspects of illumination and luminance. These conditions may affect operators' visibility and disillusion level, cause stress, attention, emotion, etc. and they finally affect workers' performance and errors as a result. From the many illumination conditions mentioned above, current work environment evaluation items on illumination are mainly based only on the intensity of illumination, and there is yet no systematic way with evaluation criteria for other factors such as luminance, flickering, etc. In addition, research and development on illumination emphasizes mainly the physical characteristics of illumination, and it is insufficient for the influence studies on human error or work performance that are caused by these factors

  10. Work plan for ground water elevation data recorder/monitor well installation at the New Rifle Site, Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-18

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the New Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project site, Rifle, Colorado. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River.

  11. Assisting the US Bureau of Reclamation with Evapotranspiration Estimation from Remote Sensing; Field Work Planning to Implementation

    Science.gov (United States)

    Czajkowski, K. P.; Nikolov, S.; Brown, N.; Subramania, S.; Watts, D.

    2005-12-01

    Central State University of Wilberforce, Ohio, a traditionally black college, is leading a group of universities (Wright State University, the University of Toledo, Cleveland State University and Colorado State University) in collaboration with the United States Bureau of Reclamation (USBR) to evaluate remote sensing technology for evapotranspiration (ET) modeling. The USBR is responsible for managing, developing, and protecting water resources and have particular interest in understanding the water balance for river basins where they manage irrigation projects. The project's goals are to test the use of remote sensing technology to obtain more frequent and accurate measurements of ET. This presentation will focus on planning and implementation of the field component of the project specifically focusing on obtaining ET observations using eddy covariance (EC) flux towers. Up to four EC towers will be deployed for a week in different cover types including alfalfa and possibly a riparian area. Initiation of the field project is scheduled for mid-October 2005 in the Palo Verde Irrigation District (PVID) near Blythe, California along the lower Colorado River. The PVID region has been studied extensively by the USBR and is viewed as an excellent test-bed for ET technology.

  12. FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Watkins, D.R.; Herbes, S.E. [eds.

    1994-12-01

    The purpose of this project is to provide key information needed by decision makers to expedite the process of environmental restoration and to provide the data base required by the Remedial Investigation/Feasibility Study (RI/FS) for Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL). WAG 2 is the major drainage system downgradient of other WAGs that contain significant sources of contamination at ORNL. Field activities to support the remedial investigation for the RI portion include characterization of the nature and extent of contamination in WAG 2 [consisting of White Oak Creek (WOC) and associated tributaries and floodplain, White Oak Lake (WOL), and White Oak Creek Embayment (WOCE)], specifically to support risk-based remediation decisions. The project consists of three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upslope WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate revaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Overall RI objectives, consistent with ORNL Environmental Restoration (ER) Program strategic objectives to reduce risks and comply with environmental regulations, are discussed in the WAG 2 Remedial Investigation Plan.

  13. Analysis of Radioactive Releases During Proposed Demolition Activities for the 224-U and 224-UA Buildings - Addendum

    Energy Technology Data Exchange (ETDEWEB)

    Napier, Bruce A.; Rishel, Jeremy P.; Droppo, James G.; Joyce, Kevin E.; Strom, Daniel J.

    2010-12-21

    A post-demolition modeling analysis is conducted that compares during-demolition atmospheric concentration monitoring results with modeling results based on the actual meteorological conditions during the demolition activities. The 224-U and 224-UA Buildings that were located in the U-Plant UO3 complex in the 200 West Area of the Hanford Site were demolished during the summer of 2010. These facilities converted uranyl nitrate hexahydrate (UNH), a product of Hanford’s Plutonium-Uranium Extraction (PUREX) Plant, into uranium trioxide (UO3). This report is an addendum to a pre-demolition emission analysis and air dispersion modeling effort that was conducted for proposed demolition activities for these structures.

  14. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-10-12

    . This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by

  15. Note: Derivation of two-photon circular dichroism - Addendum to "two-photon circular dichroism" [J. Chem. Phys. 62, 1006 (1975)

    OpenAIRE

    Friese, Daniel Henrik

    2015-01-01

    Published version, also available at http://dx.doi.org/10.1063/1.4930017 This addendum shows the detailed derivation of the fundamental equations for two-photon circular dichroism which are given in a very condensed form in the original publication [I. Tinoco, J. Chem. Phys. 62, 1006 (1975)]. In addition, some minor errors are corrected and some of the derivations in the original publication are commented.

  16. Addendum to the Closure Report for Corrective Action Unit 411: Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Burmeister, Mark [Navarro, Las Vegas, NV (United States)

    2016-11-01

    The Corrective Action Unit (CAU) 411 Closure Report (CR) was published in June 2016 (NNSA/NFO, 2016). The purpose of this addendum is to clarify language in the CR relating to the field instrument for the detection of low-energy radiation (FIDLER), provide the waste disposal documentation for waste generated during the corrective action investigation (CAI), and reference a letter from the U.S. Air Force (USAF) regarding the closure of CAU 411.

  17. GPHS-RTGs in support of the Cassini RTG Program. Addendum to the final technical report, May 1--December 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This Addendum to the Cassini GPHS-RTG Program Final Technical Progress Report describes activities performed during the period 1 May 1998 through 31 December 1998, including effort reflecting contract modification M058. These activities include Earth Gravity Assist (EGA) reentry and related analyses which are detailed in Part A, and effort related to the installation of CAGO equipment within Lockheed Martin`s Building 100 facility in Valley Forge, PA, which is detailed in Part B.

  18. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This Remedial Investigation (RI) Work Plan specifically addresses Chestnut Ridge Operable Unit 1, (OU1) which consists of the Chestnut Ridge Security Pits (CRSP). The CRSP are located {approximately}800 ft southeast of the central portion of the Y-12 Plant atop Chestnut Ridge, which is bounded to the northwest by Bear Creek Valley and to the southeast by Bethel Valley. Operated from 1973 to 1988, the CRSP consisted of a series of trenches used for the disposal of classified hazardous and nonhazardous waste materials. Disposal of hazardous waste materials was discontinued in December 1984, while nonhazardous waste disposal ended on November 8, 1988. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern (COC), support an ecological risk assessment (ERA) and a human health risk assessment (HHRA), support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this Work Plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU1. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the overall risk posed to human health and the environment by OU1.

  19. Soil sampling and analysis plan for the Bear Creek Valley floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. It is an addendum to a previously issued document, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19&D2), which presents background information pertaining to this floodplain investigation. The strategy presented in the SAP is to divide the investigation into three component parts: a large-scale characterization of the floodplain; a fine-scale characterization of the floodplain beginning with a known contaminated location; and a stream sediment characterization. During the large-scale and the fine-scale characterizations, soil and biota samples (i.e., small mammals, earthworms, and vegetation) will be collected in order to characterize the nature and extent of floodplain soil contamination and the impact of this contamination on floodplain biota. The fine-scale characterization will begin with an investigation of a site corresponding to the location noted in the Remedial Investigation Work Plan (ES/ER-19&D2) as an area where uranium and PCBs are concentrated in discrete strata. During this fine-scale characterization, a 1 m deep soil profile excavation will be dug into the creek berm, and individual soil strata in the excavation will be screened for alpha radiation, PCBs, and VOCs. After the laboratory analysis results are received, biota samples will be collected in the vicinity of those locations.

  20. Site inspection addendum. Fort Meade feasibility study and remedial investigation/site inspection Fort George G. Meade, Maryland. Revision 1. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    This Site Inspection Addendum Report has been prepared to address the Site Inspection portion of the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) activities at Fort George G. Meade. It has been prepared under Delivery Order No. 009 and a Change Order dated July 15, 1993, for the U.S. Army Environmental Center (USAEC), formerly known as the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA). This report fulfills the requirements of deliverable ELIN A004 under Delivery Order 0009 of the Total Environmental Program Support (TEPS) contract DAAAl5-91-D-00l6. The purpose of this Site Inspection Addendum (SIA) report is to report the findings of Arthur D. Little`s SIA investigation. The overall purpose of an SI is to evaluate if chemical releases or potential contamination has occurred at suspected sites and to determine if further investigation is warranted. This study is an addendum to a previous SI and addresses data gaps remaining from or identified in that document. Six sites at Fort George G. Meade (FGGM) are included in the SIA: DPDO Salvage Yard and Transform Storage Area; DPDO Salvage Yard and Transformer Storage Area; Fire Training Area; Helicopter Hangar Area; Inactive Landfill No. 2, Ordnance Demolition Area Soldiers Lake.

  1. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Krauss, Mark J

    2013-10-01

    This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.

  2. Environmental assessment for transuranic waste work-off plan, Los Alamos National Laboratory. Rough draft: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-26

    The Los Alamos National Laboratory (LANL) generates transuranic (TRU) waste in a variety of programs related to national defense. TRU waste is a specific class of radioactive waste requiring permanent isolation. Most defense-related TRU waste will be permanently disposed of in the Waste Isolation Pilot Plant (WIPP). WIPP is a deep geologic repository located in southeastern New Mexico and is now in the testing phase of development. All waste received by Wipp must conform with established Waste Acceptance Criteria (WAC). The purpose of the proposed action is to retrieve stored TRU waste and prepare the waste for shipment to and disposal WIPP. Stored TRU waste LANL is represented by four waste forms. The facilities necessary for work-off activities are tailored to the treatment and preparation of these four waste forms. Preparation activities for newly generated TRU waste are also covered by this action.

  3. Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2010-08-16

    former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides

  4. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    Energy Technology Data Exchange (ETDEWEB)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors

  5. 77 FR 36569 - Endangered and Threatened Wildlife and Plants; Thick-Billed Parrot Draft Recovery Plan Addendum

    Science.gov (United States)

    2012-06-19

    ... their ecosystems is a primary goal of our endangered species program and the Act (16 U.S.C. 1531 et seq... deterioration of Mexican ecosystems and biodiversity. Thirty-five priority and endangered species were selected... predicting warmer, drier, and more drought-like conditions (Hoerling and Eischeid 2007; Seager et al. 2007...

  6. Work plan for preliminary investigation of organic constituents in ground water at the New Rifle site, Rifle, Colorado. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    A special study screening for Appendix 9 (40 CFR Part 264) analytes identified the New Rifle site as a target for additional screening for organic constituents. Because of this recommendation and the findings in a recent independent technical review, the US Department of Energy (DOE) has requested that the Technical Assistance Contractor (TAC) perform a preliminary investigation of the potential presence of organic compounds in the ground water at the New Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project site, Rifle, Colorado. From 1958 to 1972, organic chemicals were used in large quantities during ore processing at the New Rifle site, and it is possible that some fraction was released to the environment. Therefore, the primary objective of this investigation is to determine whether organic chemicals used at the milling facility are present in the ground water. The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water well points at the New Rifle site. The selection of analytes and the procedures for collecting ground water samples for analysis of organic constituents are also described.

  7. Final work plan : investigation of potential contamination at the former CCC/USDA grain storage facility in Hanover, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-19

    Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Seven technical objectives have been proposed for the Hanover investigation. They are as follows: (1) Identify the sources and extent of soil contamination beneath the former CCC/USDA facility; (2) Characterize groundwater contamination beneath the former CCC/USDA facility; (3) Determine groundwater flow patterns; (4) Define the vertical and lateral extent of the groundwater plume outside the former CCC/USDA facility; (5) Evaluate the aquifer and monitor the groundwater system; (6) Identify any other potential sources of contamination that are not related to activities of the CCC/USDA; and (7) Determine whether there is a vapor intrusion problem at the site attributable to the former CCC/USDA facility. The technical objectives will be accomplished in a phased approached. Data collected during each phase will be evaluated to determine whether the subsequent phase is necessary. The KDHE project manager and the CCC/USDA will be contacted during each phase and kept apprised of the results. Whether implementation of each phase of work is necessary will be discussed and mutually agreed upon by the CCC/USDA and KDHE project managers.

  8. Suicidal ideation and planning among Palestinian middle school students living in Gaza Strip, West Bank, and United Nations Relief and Works Agency (UNRWA camps

    Directory of Open Access Journals (Sweden)

    Taha Itani

    2017-06-01

    Full Text Available The goal of this study was to identify the prevalence and correlates of suicidal thinking among Palestinian middle school students by using complex samples analysis to explore data about suicidal ideation and suicidal planning in the past year from 14,303 students in grades 7, 8, and 9 (roughly ages 13–15 years who participated in the Global School-based Student Health Survey (GSHS in 2010 in the Occupied Palestinian Territory (OPT and United Nations Relief and Works Agency (UNRWA refugee camps. We also analyzed data from the seven other GSHS-participating countries from the Eastern Mediterranean region: Iraq, Jordan, Kuwait, Lebanon, Morocco, Tunisia, and the United Arab Emirates. The overall prevalence of suicidal ideation and/or planning was 25.6%. Males were more likely than females to report suicidal thinking. The health behaviors and exposures most strongly associated with suicidal thinking were marijuana use, having no close friends, tobacco use, loneliness, worry-induced insomnia, food insecurity, and being the victim of a bully. Being involved in physical fights and attacks, skipping school, and perceptions of limited parental support were also associated with suicidal thinking. The prevalence of suicidal thinking among Palestinian adolescents was higher than the rates in the other GSHS-participating countries, pointing toward a need for improved access to adolescent mental health services.

  9. Hygienic-sanitary working practices and implementation of a Hazard Analysis and Critical Control Point (HACCP plan in lobster processing industries

    Directory of Open Access Journals (Sweden)

    Cristina Farias da Fonseca

    2013-03-01

    Full Text Available This study aimed to verify the hygienic-sanitary working practices and to create and implement a Hazard Analysis Critical Control Point (HACCP in two lobster processing industries in Pernambuco State, Brazil. The industries studied process frozen whole lobsters, frozen whole cooked lobsters, and frozen lobster tails for exportation. The application of the hygienic-sanitary checklist in the industries analyzed achieved conformity rates over 96% to the aspects evaluated. The use of the Hazard Analysis Critical Control Point (HACCP plan resulted in the detection of two critical control points (CCPs including the receiving and classification steps in the processing of frozen lobster and frozen lobster tails, and an additional critical control point (CCP was detected during the cooking step of processing of the whole frozen cooked lobster. The proper implementation of the Hazard Analysis Critical Control Point (HACCP plan in the lobster processing industries studied proved to be the safest and most cost-effective method to monitor each critical control point (CCP hazards.

  10. Evaluation of the reliability and effectiveness of plans for finishing off seams influenced by overlying or underlying workings without the use of pillars

    Energy Technology Data Exchange (ETDEWEB)

    Batmanov, Iu.K.; Bakhtin, A.F.; Bulavka, E.I.

    1981-01-01

    The pillar-less plan for finishing off seams using longwalls above thick pillars influenced by overlying or underlying workings earlier without the use of pillars on productive (thicker) seams is effective both from the point of view of its reliability and from the economic point of view (even when present techniques are used, as well as under complex mining-geological conditions. The system described is used on the Ukrainian Donbass mines in a total of 13% of the cases out of the overall number of contiguous, gently sloping and inclined coal seams of various thicknessess; the improvement in the amount of coal obtained can be said to have increased by a factor of 2.

  11. Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

  12. Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200­-SW­-2 Operable Unit at the U.S. Department of Energy’s Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nimmons, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-09-01

    A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200­SW­1 and 200­SW­2 Collaborative Workshops-Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

  13. Behavioral determinants as predictors of return to work after long-term sickness absence: an application of the theory of planned behavior.

    Science.gov (United States)

    Brouwer, Sandra; Krol, Boudien; Reneman, Michiel F; Bültmann, Ute; Franche, Renée-Louise; van der Klink, Jac J L; Groothoff, Johan W

    2009-06-01

    The aim of this prospective, longitudinal cohort study was to analyze the association between the three behavioral determinants of the theory of planned behavior (TPB) model--attitude, subjective norm and self-efficacy--and the time to return-to-work (RTW) in employees on long-term sick leave. The study was based on a sample of 926 employees on sickness absence (maximum duration of 12 weeks). The employees filled out a baseline questionnaire and were subsequently followed until the tenth month after listing sick. The TPB-determinants were measured at baseline. Work attitude was measured with a Dutch language version of the Work Involvement Scale. Subjective norm was measured with a self-structured scale reflecting a person's perception of social support and social pressure. Self-efficacy was measured with the three subscales of a standardised Dutch version of the general self-efficacy scale (ALCOS): willingness to expend effort in completing the behavior, persistence in the face of adversity, and willingness to initiate behavior. Cox proportional hazards regression analyses were used to identify behavioral determinants of the time to RTW. Median time to RTW was 160 days. In the univariate analysis, all potential prognostic factors were significantly associated (P behavior as significant predictive factors. This prospective, longitudinal cohort-study showed that work attitude, social support and willingness to expend effort in completing the behavior are significantly associated with a shorter time to RTW in employees on long-term sickness absence. This provides suggestive evidence for the relevance of behavioral characteristics in the prediction of duration of sickness absence. It may be a promising approach to address the behavioral determinants in the development of interventions focusing on RTW in employees on long-term sick leave.

  14. The effects of moderate heat stress and open-plan office noise distraction on SBS symptoms and on the performance of office work.

    Science.gov (United States)

    Witterseh, Thomas; Wyon, David P; Clausen, Geo

    2004-01-01

    Three air temperatures (22/26/30 degrees C) and two acoustic conditions-quiet (35 dBA) or open-plan office noise (55 dBA)-were established in an office. Thirty subjects aged 18-29 years (16 male), clothed for thermal neutrality at 22 degrees C, performed simulated office work for 3 h under all six conditions. Many more (68% vs. 4%) were dissatisfied with noise in the noise condition (P perceived air quality (P effects on subjective perception. In an addition task, noise decreased workrate by 3% (P effect of warmth on errors was less in the noise condition. Typing speed (P effects on the performance of office work, as does a moderately warm air temperature. These findings may be used to provide economic justification for the provision of private offices and air temperature control in hot weather. The additional finding that noise distraction and heat stress can sometimes counteract each other in the short term is of academic interest only, as they both increase subjective distress and fatigue. In practice, neither should be deliberately introduced to counteract the other.

  15. Work plan for improving the DARWIN2.3 depleted material balance calculation of nuclides of interest for the fuel cycle

    Directory of Open Access Journals (Sweden)

    Rizzo Axel

    2017-01-01

    Full Text Available DARWIN2.3 is the reference package used for fuel cycle applications in France. It solves the Boltzmann and Bateman equations in a coupling way, with the European JEFF-3.1.1 nuclear data library, to compute the fuel cycle values of interest. It includes both deterministic transport codes APOLLO2 (for light water reactors and ERANOS2 (for fast reactors, and the DARWIN/PEPIN2 depletion code, each of them being developed by CEA/DEN with the support of its industrial partners. The DARWIN2.3 package has been experimentally validated for pressurized and boiling water reactors, as well as for sodium fast reactors; this experimental validation relies on the analysis of post-irradiation experiments (PIE. The DARWIN2.3 experimental validation work points out some isotopes for which the depleted concentration calculation can be improved. Some other nuclides have no available experimental validation, and their concentration calculation uncertainty is provided by the propagation of a priori nuclear data uncertainties. This paper describes the work plan of studies initiated this year to improve the accuracy of the DARWIN2.3 depleted material balance calculation concerning some nuclides of interest for the fuel cycle.

  16. Work plan for improving the DARWIN2.3 depleted material balance calculation of nuclides of interest for the fuel cycle

    Science.gov (United States)

    Rizzo, Axel; Vaglio-Gaudard, Claire; Martin, Julie-Fiona; Noguère, Gilles; Eschbach, Romain

    2017-09-01

    DARWIN2.3 is the reference package used for fuel cycle applications in France. It solves the Boltzmann and Bateman equations in a coupling way, with the European JEFF-3.1.1 nuclear data library, to compute the fuel cycle values of interest. It includes both deterministic transport codes APOLLO2 (for light water reactors) and ERANOS2 (for fast reactors), and the DARWIN/PEPIN2 depletion code, each of them being developed by CEA/DEN with the support of its industrial partners. The DARWIN2.3 package has been experimentally validated for pressurized and boiling water reactors, as well as for sodium fast reactors; this experimental validation relies on the analysis of post-irradiation experiments (PIE). The DARWIN2.3 experimental validation work points out some isotopes for which the depleted concentration calculation can be improved. Some other nuclides have no available experimental validation, and their concentration calculation uncertainty is provided by the propagation of a priori nuclear data uncertainties. This paper describes the work plan of studies initiated this year to improve the accuracy of the DARWIN2.3 depleted material balance calculation concerning some nuclides of interest for the fuel cycle.

  17. A comparison of job descriptions for nurse practitioners working in out-of-hours primary care services: implications for workforce planning, patients and nursing.

    Science.gov (United States)

    Teare, Jean; Horne, Maria; Clements, Gill; Mohammed, Mohammed A

    2017-03-01

    To compare and contrast job descriptions for nursing roles in out-of-hours services to obtain a general understanding of what is required for a nurse working in this job. Out-of-hours services provide nursing services to patients either through telephone or face-to-face contact in care centres. Many of these services are newly created giving job opportunities to nurses working in this area. It is vital that nurses know what their role entails but also that patients and other professionals know how out-of-hours nurses function in terms of competence and clinical role. Content analysis of out-of-hours job descriptions. Content analysis of a convenience sample of 16 job descriptions of out-of-hours nurses from five out-of-hours care providers across England was undertaken. The findings were narratively synthesised, supported by tabulation. Key role descriptors were examined in terms of job titles, managerial skills, clinical skills, professional qualifications and previous experience. Content analysis of each out-of-hours job description revealed a lack of consensus in clinical competence and skills required related to job title although there were many similarities in skills across all the roles. This study highlights key differences and some similarities between roles and job titles in out-of-hours nursing but requires a larger study to inform workforce planning. Out-of-hours nursing is a developing area of practice which requires clarity to ensure patient safety and quality care. © 2016 John Wiley & Sons Ltd.

  18. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N. [Oak Ridge National Lab., TN (United States); Manis, L.W.; Barre, W.L. [Analysas Corp., Oak Ridge, TN (United States)

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.

  19. Final work plan : indoor air and ambient air sampling near the former CCC/USDA grain storage facility in Everest, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2010-05-24

    The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the western edge of Everest, Kansas, from the early 1950s to the early 1970s. Sampling by the Kansas Department of Health and Environment (KDHE) in 1997 resulted in the detection of carbon tetrachloride in one domestic well (the Nigh well) northwest of the former facility. On behalf of the CCC/USDA, Argonne National Laboratory subsequently conducted a series of investigations to characterize the contamination (Argonne 2003, 2006a,b,c). Automatic, continuous monitoring of groundwater levels began in 2002 and is ongoing at six locations. The results have consistently indicated groundwater flow toward the north-northwest from the former CCC/USDA property to the Nigh property, then west-southwest from the Nigh property to the intermittent creek. Sitewide periodic groundwater and surface water sampling with analysis for volatile organic compounds (VOCs) began in 2008. Argonne's combined data indicate no significant downgradient extension of contamination since 2000. At present, the sampling is annual, as approved by the KDHE (2009) in response to a plan developed for the CCC/USDA (Argonne 2009). This document presents a plan for collecting indoor air samples in homes located along and adjacent to the defined extent of the carbon tetrachloride contamination. The plan was requested by the KDHE. Ambient air samples to represent the conditions along this pathway will also be taken. The purpose of the proposed work is to satisfy KDHE requirements and to collect additional data for assessing the risk to human health due to the potential upward migration of carbon tetrachloride and its primary degradation product (chloroform) into homes located in close proximity to the former grain storage facility, as well as along and within 100 ft laterally from the currently defined plume emanating from the former Everest facility. Investigation of the indoor air

  20. Planning and Doing in Professional Teaching Practice. A Study with Early Childhood Education Teachers Working with ICT (3-6 Years)

    Science.gov (United States)

    Ramírez, Elena; Clemente, María; Recamán, Adriana; Martín-Domínguez, Jorge; Rodríguez, Inés

    2017-01-01

    Planning is one of the professional tasks teachers have to carry out before their direct action in the classrooms. This planning is closely interrelated to the way teachers teach. The question about how and why teachers reach their decisions in their pre-class planning is a classical one in the research into curricular design and development. The…

  1. Psychometric properties of the Brazilian version of the Pittsburgh Sleep Quality Index Addendum for PTSD (PSQI-A

    Directory of Open Access Journals (Sweden)

    Jair B. Barbosa Neto

    2014-12-01

    Full Text Available Objective: Sleep disturbances play a fundamental role in the pathophysiology posttraumatic stress disorder (PTSD, and are not only a secondary feature. The aim of this study was to validate and assess the psychometric properties of the Brazilian version of the Pittsburgh Sleep Quality Index Addendum for PTSD (PSQI-A-BR, a self-report instrument designed to assess the frequency of seven disruptive nocturnal behaviors, in a sample of participants with and without PTSD. Methods: PSQI-A was translated into Brazilian Portuguese and applied to a convenience sample of 190 volunteers, with and without PTSD, who had sought treatment for the consequences of a traumatic event. Results: The PSQI-A-BR displayed satisfactory internal consistency (Cronbach's coefficient of 0.83 between all items and convergent validity with the Clinician Administered PTSD Scale (CAPS, even when excluding sleep-related items (r = 0.52. Test-retest yielded high agreement in the global PSQI-A-BR, with good stability over time (r = 0.88. A global PSQI-A-BR cutoff score of 7 yielded a sensitivity of 79%, specificity of 64%, and a global score of 7 yielded a positive predictive value of 93% for discriminating participants with PTSD from those without PTSD. Conclusion: The PSQI-A-BR is a valid instrument for PTSD assessment, applicable to both clinical and research settings.

  2. Validation of the Pittsburgh Sleep Quality Index Addendum for Posttraumatic Stress Disorder (PSQI-A) in Male Military Veterans

    Science.gov (United States)

    Insana, Salvatore P.; Hall, Martica; Buysse, Daniel J.; Germain, Anne

    2013-01-01

    Sleep disturbances are core symptoms of posttraumatic-stress disorder (PTSD), yet they bear less stigma than other PTSD symptoms. Given the growing number of returning military veterans, brief, valid assessments that identify PTSD in a minimally stigmatizing way may be highly useful in both research and clinical practice. The Pittsburgh Sleep Quality Index Addendum for PTSD (PSQI-A) was examined for the ability to identify cases of PTSD among male military veterans. Male military veterans (N = 119) completed the PSQI-A, as well as measures of sleep quality, combat exposure, posttraumatic stress, depression, and anxiety. Veterans with PTSD had higher PSQI-A identified disruptive nocturnal behaviors than veterans without PTSD. The PSQI-A had good internal consistency and had convergent validity with sleep quality, combat exposure, PTSD symptoms, depression, and anxiety. A cutoff score ≥ 4 provided an area-under-the-curve = .81, with 71% sensitivity, 82% specificity, and 60% positive and 83% negative predictive value for a clinical diagnosis of PTSD; correct classification was 74%. The PSQI-A is a valid measure to possibly detect PTSD among male military veterans without directly probing trauma reactions. Assessment of disruptive nocturnal behaviors may provide a cost-effective, non-stigmatizing approach to PTSD screening among male military veterans. PMID:23512653

  3. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  4. Social Work Involvement in Advance Care Planning: Findings from a Large Survey of Social Workers in Hospice and Palliative Care Settings.

    Science.gov (United States)

    Stein, Gary L; Cagle, John G; Christ, Grace H

    2017-03-01

    Few data are available describing the involvement and activities of social workers in advance care planning (ACP). We sought to provide data about (1) social worker involvement and leadership in ACP conversations with patients and families; and (2) the extent of functions and activities when these discussions occur. We conducted a large web-based survey of social workers employed in hospice, palliative care, and related settings to explore their role, participation, and self-rated competency in facilitating ACP discussions. Respondents were recruited through the Social Work Hospice and Palliative Care Network and the National Hospice and Palliative Care Organization. Descriptive analyses were conducted on the full sample of respondents (N = 641) and a subsample of clinical social workers (N = 456). Responses were analyzed to explore differences in ACP involvement by practice setting. Most clinical social workers (96%) reported that social workers in their department are conducting ACP discussions with patients/families. Majorities also participate in, and lead, ACP discussions (69% and 60%, respectively). Most respondents report that social workers are responsible for educating patients/families about ACP options (80%) and are the team members responsible for documenting ACP (68%). Compared with other settings, oncology and inpatient palliative care social workers were less likely to be responsible for ensuring that patients/families are informed of ACP options and documenting ACP preferences. Social workers are prominently involved in facilitating, leading, and documenting ACP discussions. Policy-makers, administrators, and providers should incorporate the vital contributions of social work professionals in policies and programs supporting ACP.

  5. Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: First Year Results and Second Year Work Plan

    Science.gov (United States)

    Skinner, J. A., Jr.; Rogers, A. D.; Seelos, K. D.

    2010-01-01

    The Libya Montes-Tyrrhena Terra highland-lowland transitional zone of Mars is a complex tectonic and erosional region that contains some of the oldest exposed materials on the Martian surface as well as aqueous mineral signatures that may be potential chemical artifacts of early highland formational processes. Our 1:1M scale mapping project includes the geologic materials and landforms contained within MTMs 00282, -05282, -10282, 00277, - 05277, and -10277, which cover the highland portion of the transitional zone. The map region extends from the Libya Montes southward into Tyrrhena Terra and to the northern rim of Hellas basin and includes volcanic rocks of Syrtis Major Planum and a broad lowlying plain (palus) that forms a topographic divide between Isidis and Hellas basins. The objective of this project is to describe the geologic history of regional massif and plains materials by combining geomorphological and compositional mapping observations. This abstract summarizes the technical approaches and interim scientific results of Year 1 efforts and the expected work plan for Year 2 efforts.

  6. Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

  7. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

  8. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

  9. Myopia prevention, near work, and visual acuity of college students: integrating the theory of planned behavior and self-determination theory.

    Science.gov (United States)

    Chan, Derwin King-Chung; Fung, Ying-Ki; Xing, Suxuan; Hagger, Martin S

    2014-06-01

    There has been little research examining the psychological antecedents of safety-oriented behavior aimed at reducing myopia risk. This study utilizes self-determination theory (SDT) and the theory of planned behavior (TPB) to understand the role of motivational and social-cognitive factors on individuals' near-work behavior. Adopting a prospective design, undergraduate students (n = 107) completed an initial questionnaire based on SDT in week 1, a second questionnaire containing measures of TPB variables in week 2, and objective measures of reading distance and visual acuity in week 6. The data were analyzed by variance-based structural equation modeling. The results showed that perceived autonomy support and autonomous motivation from SDT significantly predicted attitude, subjective norm, and perceived behavioral control from the TPB. These social-cognitive factors were significantly associated with intention and intention significantly predicted reading distance. The relationships in the model held when controlling for visual acuity. In conclusion, the integrated model of SDT and the TPB may help explain myopia-preventive behaviors.

  10. Installation restoration program, remedial investigation/feasibility study report addendum for Indian Mountain Long Range Radar Station, Alaska. Final report, 1 August-18 December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The following report is an addendum to the Indian Mountain Long Range Radar Station (LRRS) Remedial Investigation/Feasibility Study (RI/FS) report dated October 1995 (Air Force 1995a). This report and the activities described were undertaken to fulfill the goals and objectives of the Air Force Installation Restoration Program (IRP). This report includes findings from additional characterization activities conducted in August 1995 at five of 11 Indian Mountain IRP source areas and revisions to RI/FS report conclusions for those source areas.

  11. Global Ocean Forecast System V3.0 Validation Test Report Addendum: Provision of Boundary Conditions to the Relocatable Navy Coastal Ocean Model (NCOM)

    Science.gov (United States)

    2012-03-21

    Model (NLOM) and 1/8º Modular Ocean Data Assimilation ( MODAS )). This document can be viewed as both a User’s Manual and an addendum to the Phase II...8217 = experiment number x10 (000=from archive file) 3 ’yrflag’ = days in year flag (0=360J16,1=366J16,2=366J01,3- actual ) $NX ’idm...366J01,3- actual ) $NX ’idm ’ = longitudinal array size $NY ’jdm ’ = latitudinal array size 32 ’kdm ’ = number of layers 34.0

  12. The Epistemography of an Urban and Regional Planning Practicum: Appropriation in the Face of Resistance. WCER Working Paper No. 2010-8

    Science.gov (United States)

    Bagley, Elizabeth

    2010-01-01

    In this paper, the author describes an ethnographic study of a graduate-level practicum at a large Midwestern university in order to examine one of the ways urban planners develop expertise. The graduate students in the practicum were guided in the production of a site plan for a developing area by a planner with 34 years of planning experience.…

  13. The Effects of an Action Plan, Staff Training, Management Support and Monitoring on Restraint Use and Costs of Work-Related Injuries

    Science.gov (United States)

    Sanders, Kim

    2009-01-01

    Background: Dignity and respect are at the foundation of good care and effective treatment planning and are guiding service principles. The use of physical restraints is contrary to treatment with dignity and respect. Because of the numerous risks to clients and employees associated with the use of physical restraints, an innovative plan was…

  14. Product Life Cycle Planning

    National Research Council Canada - National Science Library

    Walaszek, Jeffrey

    2003-01-01

    .... This phase of work was undertaken to: (1) provide guidelines, technical support, and planning approaches for researchers that result in realistic life cycle plans for products emerging from the RSM...

  15. Reference dosimetry on TomoTherapy: an addendum to the 1990 UK MV dosimetry code of practice

    Science.gov (United States)

    Thomas, S. J.; Aspradakis, M. M.; Byrne, J. P.; Chalmers, G.; Duane, S.; Rogers, J.; Thomas, R. A. S.; Tudor, G. S. J.; Twyman, N.

    2014-03-01

    The current UK code of practice for high-energy photon therapy dosimetry (Lillicrap et al 1990 Phys. Med. Biol. 35 1355-60) gives instructions for measuring absorbed dose to water under reference conditions for megavoltage photons. The reference conditions and the index used to specify beam quality require that a machine be able to set a 10 cm × 10 cm field at the point of measurement. TomoTherapy machines have a maximum collimator setting of 5 cm × 40 cm at a source to axis distance of 85 cm, making it impossible for users of these machines to follow the code. This addendum addresses the specification of reference irradiation geometries, the choice of ionization chambers and the determination of dosimetry corrections, the derivation of absorbed dose to water calibration factors and choice of appropriate chamber correction factors, for carrying out reference dosimetry measurements on TomoTherapy machines. The preferred secondary standard chamber remains the NE2611 chamber, which with its associated secondary standard electrometer, is calibrated at the NPL through the standard calibration service for MV photon beams produced on linear accelerators with conventional flattening filters. Procedures are given for the derivation of a beam quality index specific to the TomoTherapy beam that can be used in the determination of a calibration coefficient for the secondary standard chamber from its calibration certificate provided by the NPL. The recommended method of transfer from secondary standard to field instrument is in a static beam, at a depth of 5 cm, by sequential substitution or by simultaneous side by side irradiation in either a water phantom or a water-equivalent solid phantom. Guidance is given on the use of a field instrument in reference fields.

  16. STOMP Subsurface Transport Over Multiple Phases Version 1.0 Addendum: ECKEChem Equilibrium-Conservation-Kinetic Equation Chemistry and Reactive Transport

    Energy Technology Data Exchange (ETDEWEB)

    White, Mark D.; McGrail, B. Peter

    2005-12-01

    flow and transport simulator, STOMP (Subsurface Transport Over Multiple Phases). Prior to these code development activities, the STOMP simulator included sequential and scalable implementations for numerically simulating the injection of supercritical CO2 into deep saline aquifers. Additionally, the sequential implementations included operational modes that considered nonisothermal conditions and kinetic dissolution of CO2 into the saline aqueous phase. This addendum documents the advancement of these numerical simulation capabilities to include reactive transport in the STOMP simulator through the inclusion of the recently PNNL developed batch geochemistry solution module ECKEChem (Equilibrium-Conservation-Kinetic Equation Chemistry). Potential geologic reservoirs for sequestering CO2 include deep saline aquifers, hydrate-bearing formations, depleted or partially depleted natural gas and petroleum reservoirs, and coal beds. The mechanisms for sequestering carbon dioxide in geologic reservoirs include physical trapping, dissolution in the reservoir fluids, hydraulic trapping (hysteretic entrapment of nonwetting fluids), and chemical reaction. This document and the associated code development and verification work are concerned with the chemistry of injecting CO2 into geologic reservoirs. As geologic sequestration of CO2 via chemical reaction, namely precipitation reactions, are most dominate in deep saline aquifers, the principal focus of this document is the numerical simulation of CO2 injection, migration, and geochemical reaction in deep saline aquifers. The ECKEChem batch chemistry module was developed in a fashion that would allow its implementation into all operational modes of the STOMP simulator, making it a more versatile chemistry component. Additionally, this approach allows for verification of the ECKEChem module against more classical reactive transport problems involving aqueous systems.

  17. Harnessing Technology for Evidence Based Education and Training in Minimally Invasive Surgery. Addendum

    National Research Council Canada - National Science Library

    Smith, C. D

    2006-01-01

    .... This current study seeks to further this work by first developing a curriculum for training an entire procedure, laparoscopic cholecystectomy, using simulation technologies and integrating cognitive...

  18. 40 CFR 52.2673 - Original identification of plan.

    Science.gov (United States)

    2010-07-01

    ...) Addendum to 13.1—Compliance Order for the Guam Power Authority's Power Barge “Inductance”. (4) Amendments... Governor's designee. (i) “Territory of Guam NAP for SO2,” consisting of the narrative or Control Strategy portion of the Piti NAP; Addendum B, “Preliminary Results of SO2 Dispersion Modeling;” and “Official...

  19. How well has land-use planning worked under different governance regimes? A case study in the Portland, OR-Vancouver, WA metropolitan area, USA

    Science.gov (United States)

    Jeffrey D. Kline; Paul Thiers; Connie P. Ozawa; J. Alan Yeakley; Sean N. Gordon

    2014-01-01

    We examine land use planning outcomes over a 30-year period in the Portland, OR-Vancouver, WA (USA) metropolitan area. The four-county study region enables comparisons between three Oregon counties subject to Oregon’s 1973 Land Use Act (Senate Bill 100) and Clark County, WA which implemented land use planning under Washington’s 1990 Growth Management Act. We describe...

  20. Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Lehman, L. L.; Nichols, W. E.

    2018-02-08

    The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements the requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.