WorldWideScience

Sample records for work force pipeline

  1. World pipeline work set for rapid growth

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion

  2. Contemporary methods of emergency repair works on transit pipelines. Repair works on in-service pipelines

    International Nuclear Information System (INIS)

    Olma, T.; Winckowski, J.

    2007-01-01

    The paper presents modern methods and relevant technologies of pipeline failure repairs, basing on TD Williamson technique for hermetic plugging of gas pipelines without interrupting service. Rules for management of emergency situations on the Polish Section of Yamal - Europe Transit Gas Pipeline are being discussed as well. (author)

  3. Use of explosives in pipeline construction work

    Energy Technology Data Exchange (ETDEWEB)

    Ball, M J

    1976-08-01

    Explosives are an essential tool in Great Britain's pipeline-construction industry, with applications on dry land and under water, in trench blasting and tunneling for road and service crossings, demolition of unwanted sections, and removal of coatings. Nobels Explosive Co. Ltd. describes basic explosives operations as pertaining to the requirements of rock trenching, submarine operations, thrust-bore and tunneling operations, demolitions, and precision blasting.

  4. The Effect of Improving the Logistics Pipeline on Supply Support of Aerospace Expeditionary Forces

    National Research Council Canada - National Science Library

    Martinez, Steven

    2001-01-01

    .... If so, the Air Force should be able to trim its wartime stocks of aircraft spares. This thesis investigated the effect of improving the logistics pipeline on the size and cost of Air Force mobility readiness spares packages (MRSPs...

  5. Living and working near pipelines : Landowner guide 2002

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The transportation of natural gas, oil and other commodities is effected by pipelines throughout most of the country. Safety in the vicinity of a pipeline is very important because damage to a pipeline could result in adverse conditions to public safety and/or the environment. Before digging, written approval must be obtained from the pipeline company. If a landowner is having difficulty negotiating an agreement with the pipeline company, they should call the National Energy Board. It is illegal to construct or excavate without authorization, and approval or denial of a request must be granted within 10 business days by the pipeline company. Three days are allowed to the pipeline company to locate its pipeline. A section dealing with pipeline right-of-way is included, as well as the safety zone and the restricted area. A 10-step checklist of safety tips assists the landowner in taking the appropriate measures in the vicinity of a pipeline. A brief overview of the responsibilities of the National Energy Board is provided, followed by a list of the main pipelines regulated by the National Energy Board. 2 figs

  6. Corporate social responsibility along pipelines: communities and corporations working together

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Edison D.R.; Lopes, Luciano E.; Danciguer, Lucilene; Macarini, Samuel; Souza, Maira de [Grupo de Aplicacao Interdisciplinar a Aprendizagem (GAIA), Campinas, SP (Brazil)

    2009-07-01

    In this paper we present GAIA's findings in three corporate social responsibility projects along pipelines owned by three Brazilian companies in gas, oil and mining sectors. The projects had as the main goal to improve the relationship with communities in the companies' direct influence areas. Clearly, the relationship with communities along pipelines is essential to prevent and reduce industrial hazards. The damage in pipelines due to agriculture, buildings, intentional perforations and traffic of heavy vehicles may cause fatal accidents, environmental and material losses. Such accidents have negative consequences with regard to economy, image and relationship with communities and environmental agencies. From communities' perspective, pipelines deteriorate their life quality due to risk of industrial hazards nearby their houses. The lack of proper information about the pipelines remarkably increases insecurity feelings and discourses against the companies among community leaders. The methodology developed by GAIA comprises companies' and communities' interests and encompasses nine stages. 1. Socio-environmental appraisal or inventory, mapping main risks, communities' needs and their leaders. 2. Communication plan, defining strategies, languages and communication vehicles for each stakeholder group. 3. Inter-institutional meetings to include other institutions in the program. 4. Launching seminar in partnership with local authorities, divulging companies' actions in the cities with pipelines. 5. Multiplier agents formation, enabling teachers, local leaders and government representatives to disseminate correct information about the pipelines such as their functioning, hazard prevention, maintenance actions, and restrictions of activities over the pipelines. 6. Formation on project management, enabling teachers, local leaders and government representatives to elaborate, fund raise and manage socio environmental projects aimed at

  7. Pipeline integrity management: integration of geotechnical and mechanical assessment to control potential risks due to external forces

    Energy Technology Data Exchange (ETDEWEB)

    Malpartida Moya, John E.; Sota, Giancarlo Massucco de la; Seri, Walter [Compania Operadora de Gas del Amazonas, Lima (Peru)

    2009-07-01

    Every pipeline integrity management system evaluates and controls various threats. On pipelines which have particular characteristics as it is the case of the Andean pipelines and pipelines crossing jungles, one of the main threats are the external forces. Even, this threat causes a greater number of failures than other threats like corrosion or the third part damage. Facing this situation, the pipeline integrity management system of TgP has achieved an important development in the use and suitable handling of the information provided by diverse techniques of pipeline mechanical inspection and geotechnical inspection of the right-of-way (ROW). This document presents our methodology, which interrelate information of the in-line inspection, information of geotechnical inspections of the ROW, instrumentation (Strain Gages), topographic monitoring, among others. All this information is supported in a Geographic Information System (GIS) which allows us to integrate the information. By means of the pipeline integrity management system we control potential risks due to external forces, we have been able to act before events become critical, with no occurrence of failures. This system allows us simultaneously to optimize efforts and preserve the mechanical integrity of our pipelines, not producing neither personal nor environmental nor economical affectation. (author)

  8. Education and the Work Force.

    Science.gov (United States)

    Lakebrink, Joan M.

    1986-01-01

    Asserts that a liberal education and supervised work experience are important to the flexibility needed in the modern workplace. Encourages equitable access to education and employment for all groups. (CH)

  9. Finding of No Significant Impact Construction of a New Water Pipeline, Travis Air Force Base, Solano County, California

    Science.gov (United States)

    2003-09-03

    Soun:e: California State Automobile Association, Bay and Maunt.Ul Secllon 1999 North Gate Road Pipeline Project Travis Air Force Base, California J... HRm ·----~----~-------~~-,~··--------~---- TrlnomlaJ , , , , r. Page_i_of~ *Resource Name or# (Assigned by recorder) -.:N

  10. Does the electromotive force (always represent work?

    Directory of Open Access Journals (Sweden)

    C. J. Papachristou

    2015-03-01

    Full Text Available In the literature of Electromagnetism, the electromotive force of a "circuit" is often defined as work done on a unit charge during a complete tour of the latter around the circuit. We explain why this statement cannot be generally regarded as true, although it is indeed true in certain simple cases. Several examples are used to illustrate these points.

  11. The decision support research of ultra-long distance pullback force computing model through the process of pipeline crossing pullback

    International Nuclear Information System (INIS)

    Xia, Huan; Liu, Huan; Jiao, Ruyi; Hu, Kun

    2016-01-01

    The calculation of pullback by the analysis of strain on pipe shows that it involves many disciplines. It is hard to build a mechanical model that is very consistent with the actual working conditions and with the general applicability. After summarizing the calculation method of domestic and foreign authorities or national standards, the paper derives a set of its own formulas. Based on statistical data of actual projects, the paper develops a formula more suitable for ultra-long pullback by comparing the computing result with the actual measured drag force, that is for engineering design and site construction personnel reference. The calculated value of ultra-long pullback coincides well with the engineering value. Three components of pullback resistance, all occupy a high proportion in back-dragging load, and the contribution of the pullback load weights back Trawler changes dynamically. Thus proving that the method is a reasonable, simple, reliable and effective method to predict pipeline status, and makes a useful exploration for the research to improve the existing prediction models in the future.

  12. Non-unions force wage cut-backs in pipeline industry

    Energy Technology Data Exchange (ETDEWEB)

    Bain, D

    1984-03-01

    Faced with another year of high unemployment and shrinking markets, Western Canada's unionized pipeline construction trades have taken a step toward stabilizing the industry. The unions have struck a bargain to combat an increasing number of non-union open shops. Management and labor cooperated to insure that the unions regain their share of the pipeline construction market. The pipeline construction boom has ended, with an overcapacity, a downturn in sales, and few major projects on the drawing boards. The bargains included wage reductions of 30%, daily living allowance reductions of nearly 50%, the elimination of double time, and the use of composite crews.

  13. Employee satisfaction: creating a positive work force.

    Science.gov (United States)

    Wright, M

    1998-01-01

    In the early 1990s, El Camino Hospital (ECH) streamlined its operations in order to remain competitive. In 1992, the hospital's District Board voted to turn the hospital's management over to a nonprofit company and it became an integrated delivery system (IDS). Hospital employees continued to suffer as their work and work schedules changed in ongoing efforts by the new administration to streamline. Finally, in early 1997, the IDS, Camino Healthcare, was dissolved. The director of radiology and radiation oncology services became aware of increasing employee problems, from high turnover rates and increased absenteeism, to morale and productivity issues. Employees also worried about job redesign, re-engineering and a lack of clear direction and expectations from department leadership. The director of the department created a task force to respond to the needs of staff members. With so much anger directed at department leadership, supervisory staff were not included in the task force. The task force worked first to identify rumors and innuendos and followed with a plan to resolve such issues. The second step was to agree to focus on issues that they could change and to let go of those they couldn't. They selected five priority issues or concerns. The group met weekly and made progress by replacing negative talk and attitudes with positive ones. Meanwhile, the director researched employee satisfaction issues so she would be prepared to discuss such issues and concerns with employees. She focused on a common theme, of having a personal mission or goal for one's self. She encouraged staff members to be aware of their own behavior when communicating with others. Although several informal surveys proved there was still much work to be done, there was positive response--a light at the end of the long tunnel.

  14. Telecommuters: the work force of the future.

    Science.gov (United States)

    Yancer, D A; Moe, J K

    1995-01-01

    Telecommuters are the work force of the future. The dawning of the information age, with its explosion of telecommunication technology, presents new opportunities for healthcare agencies to extend their borders far beyond traditional physical boundaries. The virtual workplace can become a reality and position healthcare agencies to be geographically dispersed throughout their community. The authors describe a pioneering effort to use telecommunications to retain a valuable employee and create a healthcare agency's first virtual workplace. Strategies for success in telecommuting also are provided from both the telecommuter's and the manager's viewpoints.

  15. Estimation of work capacity of welded mounting joints of pipelines of heat resisting steel

    International Nuclear Information System (INIS)

    Gorynin, I.V.; Ignatov, V.A.; Timofeev, B.T.; Blyumin, A.A.

    1982-01-01

    The analysis of a work capacity of circular welds made for the Dsub(y)850 pipeline connection with high pressure vessels of heat resisting steel of the 15Kh1NMFA type has been carried out on the base of test results with small samples and real units. Welds were performed using the manual electric arc welding without the following heat treatment. It has been shown that residual stresses in such welds do not produce an essential effect on the resistance of weld metal and heat affected zone on the formation and developments of cracks

  16. optimization for trenchless reconstruction of pipelines

    Directory of Open Access Journals (Sweden)

    Zhmakov Gennadiy Nikolaevich

    2015-01-01

    Full Text Available Today the technologies of trenchless reconstruction of pipelines are becoming and more widely used in Russia and abroad. One of the most perspective is methods is shock-free destruction of the old pipeline being replaced with the help of hydraulic installations with working mechanism representing a cutting unit with knife disks and a conic expander. A construction of a working mechanism, which allows making trenchless reconstruction of pipelines of different diameters, is optimized and patented and its developmental prototype is manufactured. The dependence of pipeline cutting force from knifes obtusion of the working mechanisms. The cutting force of old steel pipelines with obtuse knife increases proportional to the value of its obtusion. Two stands for endurance tests of the knifes in laboratory environment are offered and patented.

  17. Annual report on contractor work force restructuring, fiscal year 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This report summarizes work force restructuring and community transition activities at all sites. It outlines work force restructuring activity for FY 1997, changing separation patterns, cost savings and separation costs, program assessment, activities to mitigate restructuring impacts, community transition activities, status of displaced workers, lessons learned, and emerging issues in worker and community transition. Work force restructuring and community transition activities for defense nuclear sites are summarized, as are work force restructuring activities at non-defense sites.

  18. Industrial Robots Join the Work Force.

    Science.gov (United States)

    Martin, Gail M.

    1982-01-01

    Robots--powerful, versatile, and easily adapted to new operations--may usher in a new industrial age. Workers throughout the labor force could be affected, as well as the nature of the workplace, skill requirements of jobs, and concomitant shifts in vocational education. (SK)

  19. Honeywell's Working Parents Task Force. Final Report and Recommendations.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    This publication provides a summary of the Honeywell Working Parent Task Force's recommendations on how to solve problems experienced by working parents. The Task Force consisted of three committees: the Employment Practices Committee (EPC); the Parent Education Committee (PEC); and the Child Care Facilities Committee (CCFC). After examining a…

  20. 48 CFR 223.570 - Drug-free work force.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Drug-free work force. 223.570 Section 223.570 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Drug-Free Workplace 223.570 Drug-free work force. ...

  1. ANALYSIS OF DEPENDENCE BETWEEN CAPITAL EXPENDUTURES OF CONSTRUCTION WORKS AND GAS DISTRIBUTION PIPELINE DIAMETER

    Directory of Open Access Journals (Sweden)

    Tabunshchikov Yuriy Andreevich

    2012-10-01

    The research also contemplates the structure of expenses associated with the piping of gas distribution networks. Mathematical equations have been derived to perform sufficiently accurate calculations of costs of construction of various types and various lengths of gas pipelines.

  2. Carbon dioxide corrosion: Modelling and experimental work applied to natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    P, Loldrup Fosboel

    2007-10-15

    CO{sub 2} corrosion is a general problem in the industry and it is expensive. The focus of this study is an oil gas production related problem. CO{sub 2} corrosion is observed in offshore natural gas transportation pipelines. A general overview of the problem is presented in chapter 1. The chemical system consists mainly of CO{sub 2}-Na{sub 2}CO{sub 3}-NaHCO{sub 3}-MEG-H{sub 2}O. Sodium is injected in the pipelines as NaOH in order to pH-stabilize the pipeline to avoid corrosion and MEG is injected in order to prevent gas hydrates. There are a great number of models available in the literature which may predict CO{sub 2} corrosion. These models are not very accurate and assume ideality in the main part of the equation. This thesis deals with aspect of improving the models to account for the non-ideality. A general overview and extension of the theory behind electrochemical corrosion is presented in chapter 2 to 4. The theory deals with the basic thermodynamics of electrolytes in chapter 2, the extension and general description of electrolyte mass transport in chapter 3, and the electrochemical kinetics of corrosion in chapter 4. A literature overview of CO{sub 2} corrosion is shown in chapter 5 and possible extensions of the models are discussed. A list of literature cites is given in chapter 6. The literature review in chapter 5 shows how FeCO{sub 3} plays a main part in the protection of steel. Especially the solubility of FeCO{sub 3} is an important factor. Chapter 7 discusses and validates the thermodynamic properties of FeCO{sub 3}. The study shows that there is a discrepancy in the properties of FeCO{sub 3}. Sets of consistent thermodynamic properties of FeCO{sub 3} are given. A mixed solvent electrolyte model is regressed in chapter 8 for the CO{sub 2}-Na{sub 2}CO{sub 3}-NaHCO{sub 3}-MEG-H{sub 2}O system. Parameters of the extended UNIQUAC model is fitted to literature data of VLE, SLE, heat excess and validated against heat capacity data. The model is also

  3. [Investigating work, age, health and work participation in the ageing work force in Germany].

    Science.gov (United States)

    Ebener, M; Hasselhorn, H M

    2015-04-01

    Working life in Germany is changing. The work force is ageing and the number of people available to the labour market will - from now on - shrink considerably. Prospectively, people will have to work longer; but still today, most people leave employment long before reaching official retirement age. What are the reasons for this? In this report, a conceptual framework and the German lidA Cohort Study are presented. The "lidA conceptual framework on work, age, health and work participation" visualises determinants of employment (11 "domains") in higher working age, e. g., "work", "health", "social status" and "life style". The framework reveals 4 key characteristics of withdrawal from work: leaving working life is the result of an interplay of different domains (complexity); (early) retirement is a process with in part early determinants in the life course (processual character); retirement has a strong individual component (individuality); retirement is embedded in a strong structural frame (structure). On the basis of this framework, the "lidA Cohort Study on work, age, health and work participation" (www.lida-studie.de) investigates long-term effects of work on health and work participation in the ageing work force in Germany. It is the only large study in Germany operationalising the concept of employability in a broad interdisciplinary approach. Employees subject to social security and born in 1959 or in 1965 will be interviewed (CAPI) every 3 years (N[wave 1]=6 585, N[wave 2]=4 244) and their data will be linked (where consented) with social security data covering employment history and with health insurance data. The study design ("Schaie's most efficient design") allows for a tri-factor model that isolates the impact of age, cohort and time. In 2014, the second wave was completed. In the coming years lidA will analyse the association of work, health and work participation, and identify age as well as generation differences. lidA will investigate the

  4. Ergonomic solutions to support forced static positions at work

    Directory of Open Access Journals (Sweden)

    Suszyński Marcin

    2017-01-01

    Full Text Available The article analyzes the available ergonomic constructions used for the support of the musculoskeletal system during static, prolonged work performed in forced positions. Possible evaluation methods are presented as well as ergonomic considerations of work performed in inclined positions, where there is no possibility of influencing the working plane. As a result of the presented work, a set of criteria has been proposed and the requirements for methods which can be used to evaluate the technical constructions supporting the worker during tasks performed in forced and static positions.

  5. Flextime: A Modified Work Force Scheduling Technique for Selected Headquarters Air Force Logistics Command Organizations.

    Science.gov (United States)

    Kimzey, Reed T.; Prince, Samuel M. O.

    The thesis discusses the advantages and disadvantages of one work force scheduling technique--flextime. The authors were interested in determining if a flextime schedule could be put into effect in a governmental organization such as Headquarters Air Force Logistics Command (AFLC). The study objectives were to determine the feasibility,…

  6. Children of Working Mothers. Special Labor Force Report. Bulletin 2158.

    Science.gov (United States)

    Bureau of Labor Statistics (DOL), Washington, DC.

    Part of a Special Labor Force Report series, this bulletin on children of working mothers discusses the increase in the number of children with working mothers as of March 1981, and describes major reasons for this growth. The bulletin consists of an article first published February 1982 in the "Monthly Labor Review," additional tables providing…

  7. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  8. 77 FR 36606 - Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public Meeting

    Science.gov (United States)

    2012-06-19

    ...: Threat Prevention --Working Group 2: Leak Detection/Mitigation & Storage --Working Group 3: Anomaly... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0146] Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public...

  9. National trachoma task forces: how can we work better?

    OpenAIRE

    Courtright P; Miri E

    2010-01-01

    Tackling trachoma is a complex challenge.In order to implement all four components of the SAFE strategy on a national level (surgery for trichiasis, antibiotics, facial cleanliness and environmental change, such as clean water and latrines), there needs to be national coordination, supported by political commitment at the highest level. In each trachoma-endemic country, the body responsible for making this work is the national trachoma task force (NTTF).

  10. National trachoma task forces: how can we work better?

    Directory of Open Access Journals (Sweden)

    Courtright P

    2010-09-01

    Full Text Available Tackling trachoma is a complex challenge.In order to implement all four components of the SAFE strategy on a national level (surgery for trichiasis, antibiotics, facial cleanliness and environmental change, such as clean water and latrines, there needs to be national coordination, supported by political commitment at the highest level. In each trachoma-endemic country, the body responsible for making this work is the national trachoma task force (NTTF.

  11. Overview of slurry pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gandhi, R L

    1982-01-01

    Slurry pipelines have proven to be a technically feasible, environmentally attractive and economic method of transporting finely divided particles over long distances. A pipeline system normally consists of preparation, pipeline and utilization facilities and requires optimization of all three components taken together. A considerable amount of research work has been done to develop hydraulic design of a slurry pipeline. Equipment selection and estimation of corrosion-erosion are considered to be as important as the hydraulic design. Future applications are expected to be for the large-scale transport of coal and for the exploitation of remotely located mineral deposits such as iron ore and copper. Application of slurry pipelines for the exploitation of remotely located mineral deposits is illustrated by the Kudremukh iron concentrate slurry pipeline in India.

  12. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  13. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  14. Calibrated work function mapping by Kelvin probe force microscopy

    Science.gov (United States)

    Fernández Garrillo, Pablo A.; Grévin, Benjamin; Chevalier, Nicolas; Borowik, Łukasz

    2018-04-01

    We propose and demonstrate the implementation of an alternative work function tip calibration procedure for Kelvin probe force microscopy under ultrahigh vacuum, using monocrystalline metallic materials with known crystallographic orientation as reference samples, instead of the often used highly oriented pyrolytic graphite calibration sample. The implementation of this protocol allows the acquisition of absolute and reproducible work function values, with an improved uncertainty with respect to unprepared highly oriented pyrolytic graphite-based protocols. The developed protocol allows the local investigation of absolute work function values over nanostructured samples and can be implemented in electronic structures and devices characterization as demonstrated over a nanostructured semiconductor sample presenting Al0.7Ga0.3As and GaAs layers with variable thickness. Additionally, using our protocol we find that the work function of annealed highly oriented pyrolytic graphite is equal to 4.6 ± 0.03 eV.

  15. Occupational health for what were, a well work force

    Energy Technology Data Exchange (ETDEWEB)

    Spiller, Roger [MSF, Stowmarket (United Kingdom)

    1997-12-31

    This paper contrasts the offshore scene of 30 years ago with today, within the limits of inadequate monitoring, then and now. It identifies stress, bullying, change, long working hours and offshore trips and lifestyle as major factors that now have to be addressed if the health of the ageing work force is not to be compromised. Activity external to formal working hours such as travel to and from home and domestic and social relationships are all modified by the nature of offshore work but rarely acknowledged as the responsibility of the employer or operator. The development of a superior lifelong health tracking system is essential for long-term surveillance and epidemiological studies. The acceptance by operators of their long-term responsibilities for staff and the families of offshore workers needs to be better developed. (author)

  16. Experimental study of high-performance cooling system pipeline diameter and working fluid amount

    Science.gov (United States)

    Nemec, Patrik; Malcho, Milan; Hrabovsky, Peter; Papučík, Štefan

    2016-03-01

    This work deals with heat transfer resulting from the operation of power electronic components. Heat is removed from the mounting plate, which is the evaporator of the loop thermosyphon to the condenser and by natural convection is transferred to ambient. This work includes proposal of cooling device - loop thermosyphon, with its construct and follow optimization of cooling effect. Optimization proceeds by selecting the quantity of working fluid and selection of diameters vapour line and liquid line of loop thermosyphon.

  17. Why the Scientific Pipeline Is Still Leaking? Women Scientists and Their Work-Life Balance in Poland

    Science.gov (United States)

    Polkowska, Dominika

    2014-01-01

    In the contemporary scholarly discourse, the under-representation of women in science is often explained by the phenomenon of women "in the pipeline". The pipeline carries a flow from one stage to another, and the flow of women diminishes between the stages. Based on the literature and qualitative studies, it can be inferred that one of…

  18. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  19. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  20. Centrifuge modelling of lateral displacement of buried pipelines; Modelagem fisica centrifuga de flambagem lateral de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Jose Renato Moreira da Silva de; Almeida, Marcio de Souza Soares de; Marques, Maria Esther Soares; Almeida, Maria Cascao Ferreira de [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Costa, Alvaro Maia da [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas (CENPES)

    2003-07-01

    This work discusses soil-structure interaction applied to the buckling phenomena of buried pipelines subjected to heated oil flow. A set of physical modelling tests on lateral buckling of pipelines buried on soft clay is presented using COPPE/UFRJ geotechnical centrifuge. A 1:30 pipeline model was moved side ward through a soft clay layer during centrifuge flight, varying the burial depth, in order to simulate the lateral buckling in plane strain condition. The results show different behaviour concerning horizontal and vertical forces measured at pipeline level due to soil reaction. (author)

  1. A German survey of the abdominal transplantation surgical work force.

    Science.gov (United States)

    Thomas, Michael N; Nadalin, Silvio; Schemmer, Peter; Pascher, Andreas; Kaiser, Gernot M; Braun, Felix; Becker, Thomas; Nashan, Björn; Guba, Markus

    2015-07-01

    This manuscript reports the results of a nationwide survey of transplant surgeons in Germany, including the demographics, training, position, individual case loads, center volumes, program structure, professional practice, grade of specialization, workload, work hours, salary, and career expectations. We contacted all 32 German transplant centers that perform liver, kidney, and pancreas transplantation. Surgeons engaged in transplantation were asked to reply to the survey. Eighty-five surgeons responded, with a mean age of 44 ± 8 years, 13% of whom were female. The median transplant frequency per active transplant surgeon was relatively low, with 16 liver transplants, 15 kidney transplants, and three pancreas transplants. The median reported center volumes were 45 liver transplants, 90 kidney transplants, and five pancreas transplants per year. Most of the surgeons reported a primary focus on hepato-pancreato-biliary surgery, and only 10% of effective work time was actually dedicated to perform transplant surgeries. The majority of respondents estimated their weekly work hours to be between 55 and 66 h. When asked about their career satisfaction and expectations, most respondents characterized their salaries as inappropriately low and their career prospects as inadequate. This survey provides a first impression of the transplant surgery work force in Germany. © 2015 Steunstichting ESOT.

  2. The Winfrith effluent pipeline

    International Nuclear Information System (INIS)

    Palmer, G.H.

    1959-11-01

    The paper describes the preparatory work leading up to the design of the Winfrith pipeline. Details of the existing system are given and some information on the predicted safe levels of radio-active discharge. (author)

  3. Status of the new initiative task force work

    International Nuclear Information System (INIS)

    Sheffield, J.

    1992-01-01

    The proposal for a open-quotes New Initiatives Task Forceclose quotes emerged from discussions in the scientific community on how to proceed following the demise of the Burning Plasma Experiment (BPX). In particular, the action of the Secretary of Energy Advisory Board (SEAB), which made the following recommendation in 1991, prompted the initiative: open-quotes Concept exploration should begin to define a new experiment in the $500 million class for the purpose of scientific study of tokomak improvements (e.g., second stability, steady state, bootstrap current) that could suggest new operating modes for ITER and permit the design of more reactor-desirable follow-ons to ITER.close quotes A New Initiative Task force, was chartered by Princeton Plasma Physics Laboratory in October 1991 to provide oversight in the development of a new experimental initiative and to provide guidance to advocate groups in the following areas: programmatic mission and technical objectives, critical issues of physics, engineering, and technology, design criteria, costing, and modes of operation. The guidance was designed to be based on broad community involvement. In addition, the Task Force was asked to identify the preferred options which could proceed to the design stage. Three primary machine designs have emerged from the work of this group, and they are briefly described. 4 refs., 2 figs., 2 tabs

  4. Assessment of the Residual Life of Steam Pipeline Material beyond the Computational Working Time

    Directory of Open Access Journals (Sweden)

    Marek Sroka

    2017-03-01

    Full Text Available This paper presents the evaluation of durability for the material of repair welded joints made from (13HMF 14MoV6-3 steel after long-term service, and from material in the as-received condition and after long-term service. Microstructure examinations using a scanning electron microscope, hardness measurements and creep tests of the basic material and welded joints of these steels were carried out. These tests enabled the time of further safe service of the examined repair welded joints to be determined in relation to the residual life of the materials. The evaluation of residual life and disposable life, and thus the estimation and determination of the time of safe service, is of great importance for the operation of components beyond the design service life. The obtained test results are part of the materials’ characteristics developed by the Institute for Ferrous Metallurgy for steels and welded joints made from these steels to work under creep conditions.

  5. Attitudes toward working mothers: accommodating the needs of mothers in the work force.

    Science.gov (United States)

    Albright, A

    1992-10-01

    More women, including mothers, are part of the work force than ever before. In the workplace, barriers often exist that restrict promotion and advancement of mothers. Mothers often are penalized in attempting to meet the demands of parent and worker roles. Parenting practices have been considered primarily the domain of mothers. However, nurturing may be done effectively by fathers or other motivated adults. Policies of employers must change to accommodate needs of families. Examples of supportive practices may include flexible working hours, parental leave, and on-site child care.

  6. Hydrocarbons pipeline transportation risk assessment

    Science.gov (United States)

    Zanin, A. V.; Milke, A. A.; Kvasov, I. N.

    2018-04-01

    The pipeline transportation applying risks assessment issue in the arctic conditions is addressed in the paper. Pipeline quality characteristics in the given environment has been assessed. To achieve the stated objective, the pipelines mathematical model was designed and visualized by using the software product SOLIDWORKS. When developing the mathematical model the obtained results made possible to define the pipeline optimal characteristics for designing on the Arctic sea bottom. In the course of conducting the research the pipe avalanche collapse risks were examined, internal longitudinal and circular loads acting on the pipeline were analyzed, as well as the water impact hydrodynamic force was taken into consideration. The conducted calculation can contribute to the pipeline transport further development under the harsh climate conditions of the Russian Federation Arctic shelf territory.

  7. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2012-01-01

    Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst.......Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst....

  8. Individual and work factors related to perceived work ability and labor force outcomes.

    Science.gov (United States)

    McGonagle, Alyssa K; Fisher, Gwenith G; Barnes-Farrell, Janet L; Grosch, James W

    2015-03-01

    Perceived work ability refers to a worker's assessment of his or her ability to continue working in his or her job, given characteristics of the job along with his or her resources. Perceived work ability is a critical variable to study in the United States, given an aging workforce, trends to delay retirement, and U.S. policy considerations to delay the age at which full Social Security retirement benefits may be obtained. Based on the job demands-resources model, cognitive appraisal theory of stress, and push/pull factors related to retirement, we proposed and tested a conceptual model of antecedents and outcomes of perceived work ability using 3 independent samples of U.S. working adults. Data regarding workers' job characteristics were from self-report and Occupational Information Network measures. Results from relative importance analysis indicated that health and sense of control were consistently and most strongly related to work ability perceptions relative to other job demands and job and personal resources when perceived work ability was measured concurrently or 2 weeks later in samples with varying occupations. Job demands (along with health and sense of control) were most strongly related to work ability perceptions when perceived work ability was measured in a manufacturing worker sample 1.6 years later. Perceived work ability also predicted lagged labor force outcomes (absence, retirement, and disability leave) while controlling for other known predictors of each. Consistent indirect effects were observed from health status and sense of control to all 3 of these outcomes via perceived work ability. PsycINFO Database Record (c) 2015 APA, all rights reserved.

  9. University of Tennessee deploys force10 switch for CERN work

    CERN Multimedia

    2007-01-01

    "Force20 networks, the pioneer in building and securing reliable networks, today announced that the University of Tennessee physics department has deployed the C300 resilient switch to analyze data form CERN's Large Hadron Collider." (1/2 page)

  10. GeoFORCE Alaska: Four-Year Field Program Brings Rural Alaskan High School Students into the STEM Pipeline

    Science.gov (United States)

    Fowell, S. J.; Rittgers, A.; Stephens, L.; Hutchinson, S.; Peters, H.; Snow, E.; Wartes, D.

    2016-12-01

    GeoFORCE Alaska is a four-year, field-based, summer geoscience program designed to raise graduation rates in rural Alaskan high schools, encourage participants to pursue college degrees, and increase the diversity of Alaska's technical workforce. Residents of predominantly Alaska Native villages holding degrees in science, technology, engineering, or math (STEM) bring valuable perspectives to decisions regarding management of cultural and natural resources. However, between 2010 and 2015 the average dropout rate for students in grades 7-12 was 8.5% per year in the North Slope School District and 7% per year in the Northwest Arctic School District. 2015 graduation rates were 70% and 75%, respectively. Statewide statistics highlight the challenge for Alaska Native students. During the 2014-2015 school year alone 37.6% of Alaska Native students dropped out of Alaskan public schools. At the college level, Alaska Native students are underrepresented in University of Alaska Fairbanks (UAF) science departments. Launched in 2012 by UAF in partnership with the longstanding University of Texas at Austin program, GeoFORCE applies the cohort model, leading the same group of high school students on geological field academies during four consecutive summers. Through a combination of active learning, teamwork, and hands-on projects at spectacular geological locations, students gain academic skills and confidence that facilitate high school and college success. To date, GeoFORCE Alaska has recruited two cohorts. 78% of these students identify as Alaska Native, reflecting community demographics. The inaugural cohort of 18 students from the North Slope Borough completed the Fourth-Year Academy in summer 2015. 94% of these students graduated from high school, at least 72% plan to attend college, and 33% will major in geoscience. A second cohort of 34 rising 9th and 10th graders entered the program in 2016. At the request of corporate sponsors, this cohort was recruited from both the

  11. Design and stabilization works of the km 767 slope of Bolivia-Brazil gas pipeline; Projeto e obra de estabilizacao do talude do km 767 do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Hudson R.; Vasconcellos, Carlos Renato Aragonez de [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline starts at Santa Cruz de La Sierra city, in Bolivia, and goes until Canoas City (RS) in Brazil, with a total extent of 3,150 km. The pipeline crosses in the 2,593 km established in Brazilian soil, the most diverse types of geology and geomorphology. Along the line, the right-of-way (ROW) also crosses a lot of roads, railways, rivers and lakes. During a routine inspection (foot patrol), signs of instability were detected at an embankment slope of a highway of the Santa Catarina state, at the pipeline crossing. An eventual failure of this slope could put the pipeline at risk. The aim of this paper is to present the aspects of the stabilizations phases, since field investigation, design, works, instrumentation, until monitoring. Emphasis is given to the design criteria to pipeline safety. The solution adopted is composite by soil nailing, a changing of slope inclination and superficial drainage system. (author)

  12. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Sponsor... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking any force account construction work, the sponsor (or any public agency acting as agent for the sponsor...

  13. Work-Energy Theorem and Friction Forces: Two Experiments

    Science.gov (United States)

    Bonanno, A.; Bozzo, G.; Grandinetti, M.; Sapia, P.

    2016-01-01

    Several studies have showed the subsistence, even in students enrolled in scientific degree courses, of spontaneous ideas regarding the motion of bodies that conflict with Newton's laws. One of the causes is related to the intuitive preconceptions that students have about the role of friction as a force. In fact, in real world novices do not…

  14. Equipment for welding of details and joints of plastic pipes in work shop conditions and at pipelines

    International Nuclear Information System (INIS)

    Doronin, V.A.

    1988-01-01

    A range of welding machines for operation in workshop conditions and at pipelines is presented. Set of welding equipment for mobile shop, producing prototypes, and mobile facility are developed. In 1989 they will provide the whole operation cycle of production and mounting of details and units of plastic tubes and will enable to organize the centralized production of welded and shaped details in the branch, thus excluding the shortage of these details. 8 refs.; 6 figs.; 2 tabs

  15. Predictability, Work-Family Conflict, and Intent to Stay: An Air Force Case Study

    National Research Council Canada - National Science Library

    Obruba, Patrick

    2001-01-01

    A survey was completed by 362 active duty Air Force members in December 2000 regarding their perceptions of schedule predictability, work-family conflict, job satisfaction, organizational commitment...

  16. Working Through Preconception: Moving from Forcing to Emergence

    OpenAIRE

    Kim Kwok; Antoinette McCallin; Geoff Dickson

    2012-01-01

    Much has been written about grounded theory and the processes of theory generation. Less is written about managing the problem of preconception, which has the potential to undermine the openness and emergence that are fundamental to classic grounded theory. The purpose of this paper is to discuss the practical realities of managing preconception, and to draw attention to less well recognised factors that contribute to forcing. The topic interest, tactical innovation in rugby, is introduced. R...

  17. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2013-01-01

    I artiklen undersøges det empiriske grundlag for Leader- ship Pipeline. Først beskrives Leadership Pipeline modellen om le- delsesbaner og skilleveje i opadgående transitioner mellem orga- nisatoriske ledelsesniveauer (Freedman, 1998; Charan, Drotter and Noel, 2001). Dernæst sættes fokus på det...... forholdet mellem kontinuitet- og diskontinuitet i ledel- seskompetencer på tværs af organisatoriske niveauer præsenteres og diskuteres. Afslutningsvis diskuteres begrænsningerne i en kompetencebaseret tilgang til Leadership Pipeline, og det foreslås, at succesfuld ledelse i ligeså høj grad afhænger af...

  18. Blueprint for Business. Reaching a New Work Force.

    Science.gov (United States)

    Hogan, Lyn A.; Erden, James Van; Mower, Eleanor; Patel, Apurva; Mitchell, Steve

    This guide is designed to help U.S. businesses successfully hire and retain individuals moving from welfare to work. Section 1 discusses the different circumstances created by the Personal Responsibility and Work Opportunity Reconciliation Act of 1996 and how those changes affect business. Section 2 reviews bottom-line benefits realized by…

  19. The Relationship between Work-Life Conflict/Work-Life Balance and Operational Effectiveness in the Canadian Forces

    Science.gov (United States)

    2006-12-01

    pertain to the issue of work-family imbalance. That is, despite the high rate of female participation in the paid labour force, women still have...variety of work-related outcomes, including reduced job performance. Work interference with family, on the other hand, was related to absenteeism and

  20. Security of pipeline facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.C. [Alberta Energy and Utilities Board, Calgary, AB (Canada); Van Egmond, C.; Duquette, L. [National Energy Board, Calgary, AB (Canada); Revie, W. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada)

    2005-07-01

    This working group provided an update on provincial, federal and industry directions regarding the security of pipeline facilities. The decision to include security issues in the NEB Act was discussed as well as the Pipeline Security Management Assessment Project, which was created to establish a better understanding of existing security management programs as well as to assist the NEB in the development and implementation of security management regulations and initiatives. Amendments to the NEB were also discussed. Areas of pipeline security management assessment include physical safety management; cyber and information security management; and personnel security. Security management regulations were discussed, as well as implementation policies. Details of the Enbridge Liquids Pipelines Security Plan were examined. It was noted that the plan incorporates flexibility for operations and is integrated with Emergency Response and Crisis Management. Asset characterization and vulnerability assessments were discussed, as well as security and terrorist threats. It was noted that corporate security threat assessment and auditing are based on threat information from the United States intelligence community. It was concluded that the oil and gas industry is a leader in security in North America. The Trans Alaska Pipeline Incident was discussed as a reminder of how costly accidents can be. Issues of concern for the future included geographic and climate issues. It was concluded that limited resources are an ongoing concern, and that the regulatory environment is becoming increasingly prescriptive. Other concerns included the threat of not taking international terrorism seriously, and open media reporting of vulnerability of critical assets, including maps. tabs., figs.

  1. Working Through Preconception: Moving from Forcing to Emergence

    Directory of Open Access Journals (Sweden)

    Kim Kwok

    2012-12-01

    Full Text Available Much has been written about grounded theory and the processes of theory generation. Less is written about managing the problem of preconception, which has the potential to undermine the openness and emergence that are fundamental to classic grounded theory. The purpose of this paper is to discuss the practical realities of managing preconception, and to draw attention to less well recognised factors that contribute to forcing. The topic interest, tactical innovation in rugby, is introduced. Researcher motivation and the management of preconception are discussed. The example used is the theory of developing, which explains how rugby coaches in New Zealand manage the problem of winning games. The research demonstrates how the novice grounded theory researcher who is prepared to follow the method and trust the process can produce a rigorous grounded theory that makes a meaningful contribution to rugby coaches, players and their administrators.

  2. Beyond the pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Barnsley, J.; Ellis, D.; McIntosh, J.

    1979-12-01

    A study was conducted on the lives of women and their families in Fort Nelson, British Columbia, and Whitehorse, Yukon Territory, two communities which are to be affected by the proposed construction of the Alaska Highway gas pipeline. The womens' socio-economic concerns resulting from the proposed construction were examined by means of interviews with samples of women living in the two communities. Results from the study include descriptions of the communities and their basic services, community planning and housing, women's work in the home and for wages, and the perceived impact of the pipeline on such matters as employment, social services, living costs, business, housing, crime, and the overall community. Recommendations are made to improve the planning process for the pipeline to include the taking into account of womens' needs in such areas as training, health care, housing, and community services. 213 refs., 4 figs., 2 tabs.

  3. Remote participation at JET Task Force work: users' experience

    International Nuclear Information System (INIS)

    Suttrop, W.; Kinna, D.; Farthing, J.; Hemming, O.; How, J.; Schmidt, V.

    2002-01-01

    The Joint European Torus (JET) fusion experiment is now operated with strong involvement of physicists from outside research laboratories, which often requires remote participation in JET physics experiments. Users' experience with tools for remote collaborative work is reported, including remote computer and data access, remote meetings, shared documentation and various other communication channels

  4. Dental work force strategies during a period of change and uncertainty.

    Science.gov (United States)

    Brown, L J

    2001-12-01

    Both supply and demand influence the ability of the dental work force to adequately and efficiently provide dental care to a U.S. population growing in size and diversity. Major changes are occurring on both sides of the dental care market. Among factors shaping the demand for dental care are changing disease patterns, shifting population demographics, the extent and features of third-party payment, and growth of the economy and the population. The capacity of the dental work force to provide care is influenced by enhancements of productivity and numbers of dental health personnel, as well as their demographic and practice characteristics. The full impact of these changes is difficult to predict. The dentist-to-population ratio does not reflect all the factors that must be considered to develop an effective dental work force policy. Nationally, the dental work force is likely to be adequate for the next several years, but regional work force imbalances appear to exist and may get worse. Against this backdrop of change and uncertainty, future dental work force strategies should strive for short-term responsiveness while avoiding long-term inflexibility. Trends in the work force must be continually monitored. Thorough analysis is required, and action should be taken when necessary.

  5. Fertility and work-force participation: The experience of Melbourne Wives.

    Science.gov (United States)

    Ware, H

    1976-11-01

    Summary Current and retrospective data on the fertility control, work-force participation intentions and practice of Melbourne wives are combined in an examination of the causal link between work-force participation and reduced family size. Stress is laid on the analysis of the interaction between work-force participation and fertility over time, taking into account the proportion of married life spent in the work-force, rather than relying exclusively on a measure of current participation, the only option available in the analysis of census-type data. The wide range of information available makes it possible to study the effects of work-force participation on wives of unimpaired fertility, as well as the different consequences of planned and unplanned participation, and of working in a variety of occupations and for a number of distinct reasons. Examination of the future fertility intentions and current contraceptive practice of the younger wives shows that working wives are not, in these respects, markedly different from their house-wife peers. Overall, the balance of the evidence indicates that in the majority of cases fertility influences work-force participation rather than the converse.

  6. What are the barriers to trying to reach, and evaluate the impact of working with, Forces Families? Assessing the effectiveness of Reading Force, a programme to promote shared reading within the Forces community

    OpenAIRE

    Baverstock, Alison

    2016-01-01

    What are the barriers to trying to reach, and evaluate the impact of working with, Forces Families? Assessing the effectiveness of Reading Force, a programme to promote shared reading within the Forces community

  7. 3 CFR - White House Task Force on Middle-Class Working Families

    Science.gov (United States)

    2010-01-01

    ... 3 The President 1 2010-01-01 2010-01-01 false White House Task Force on Middle-Class Working Families Presidential Documents Other Presidential Documents Memorandum of January 30, 2009 White House... times. To these ends, I hereby direct the following: Section 1. White House Task Force on Middle-Class...

  8. Compatibility of the Ampere and Lorentz force laws with the virtual-work concept

    International Nuclear Information System (INIS)

    Graneau, P.

    1983-01-01

    Whenever the reaction forces between parts of an electric circuit have to be calculated, as in the design of railguns, a choice has to be made between three available formulae which have evolved during the past 160 years. The first was Ampere's force law for the mechanical interaction between two current elements. Neumann then derived the virtual-work formula from what may be called the Ampere-Neumann electrodynamics. The last to be introduced was the Lorentz force law. This paper investigates whether both the Amperian and the Lorentzian forces are compatible with the virtual-work concept. The conclusion is that only Ampere's formula agrees in all cases with the virtual-work idea, but in special circumstances the Lorentz law will give the same result. After demonstrating how Ampere's law can be derived from the virtual-work formula, it is shown that for two closed circuits the relativistic component of the Lorentz force vanishes under the double integral around the two circuits. The remaining nonvanishing term is also present in the Ampere electrodynamics. This is not the case when considering the reaction forces between two parts of an isolated circuit. The Lorentz force is then, in general, not compatible with the virtual-work concept unless the circuit possesses a high degree of symmetry

  9. Force and work to shear green southern pine logs at slow speed

    Science.gov (United States)

    Peter Koch

    1971-01-01

    When logs of three diameter classes and two specific gravity classes were sheared with a 3/8-inch-thick knife travelling at 2 inches per minute, shearing force and work averaged greatest for dense 13.6-inch logs cut with a knife having a 45o sharpness angle (73,517 pounds; 49,838 foot-pounds). Force and work averaged at least 5.1-inch bolts of...

  10. Analysis of lower limb force in foot work exercise of Pilates

    Directory of Open Access Journals (Sweden)

    Carolina Neis Machado

    Full Text Available Abstract Introduction: Pilates is a physical exercise method that uses the resistance of springs to modulate the overload from exercises. Objective: To characterize the force versus time curve of the foot work exercise; verify and compare the force applied by the same limb during the foot work exercise against the resistance of two types of springs with different elastic constants, and verify and compare the asymmetry of force applied by right and left lower limbs during the foot work exercise against the resistance of the same type of spring. Methods: Twenty healthy adult individuals familiarized with Pilates were evaluated. Two extensometric force plates adapted to the Reformer apparatus were used. Each participant performed 10 repetitions of the exercise against the resistance of two pairs of springs with different elastic constants. Descriptive and inferential statistics were used with significance levels of p < 0.05. Results: The exercise's standard curve showed that the peak force is reached in the point of maximum hip and knee extension during the execution of the exercise. There were differences between force production by the same limb for different springs (p < 0.001 and between left and right limb when spring with lower elastic constant was used (p = 0.006. No differences were found between right and left limb when spring with higher elastic constant was used (p = 0.108. Conclusion: The knowledge of the force versus time curve and the quantification of unilateral force are important elements in the evaluation and prescription of exercises.

  11. Effort problem of chemical pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Okrajni, J.; Ciesla, M.; Mutwil, K. [Silesian Technical University, Katowice (Poland)

    1998-12-31

    The problem of the technical state assessment of the chemical pipelines working under mechanical and thermal loading has been shown in the paper. The pipelines effort after the long time operating period has been analysed. Material geometrical and loading conditions of the crack initiation and crack growth process in the chosen object has been discussed. Areas of the maximal effort have been determined. The material structure charges after the long time operating period have been described. Mechanisms of the crack initiation and crack growth in the pipeline elements have been analysed and mutual relations between the chemical and mechanical influences have been shown. (orig.) 16 refs.

  12. Environmental management of works in pipelines at natural protected areas; Gestao ambiental em obras de faixas de dutos nas areas naturais protegidas

    Energy Technology Data Exchange (ETDEWEB)

    Raul, Vanderlei Lourenco; Alves, Anibal Jose Constantino; Martini, Andrea Dietrich; Lima, Silvia Ferreira de; Campos, Cleber Lucio dos Santos; Ozorio, Tarcisio Faria; Melo Neto, Joao Evangelista de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The TRANSPETRO pipeway in the State of Sao Paulo crosses different scenarios, including Permanent Preservation Areas and Conservation Units, as the Parque Estadual da Serra do Mar - PESM, which contains the most extensive Mata Atlantica fragment, with more than 315,000 hectares. The rigor of environmental organisms imposes a number of extra conditions to critical points to be considered in activities with interference in the conservation unit. It was studied the case of thirty two kilometer pipeline substitution of OSBAT pipeway, in the Sao Sebastiao city, in the area covered by the PESM, to know the effective of environmental controls adopted. It was able to analyze the results about the application of management instruments at different levels, including independent external audit, audit of the Company that realized the work activities and audit of the own specialized people of TRANSPETRO and PETROBRAS. (author)

  13. Submarine pipelines and the North Sea environment

    International Nuclear Information System (INIS)

    Haldane, D.; Paul, M.A.; Reuben, R.L.; Side, J.C.

    1992-01-01

    The function and design of pipelines for use on the United Kingdom continental shelf are described. Environmental influences which can threaten the integrity of seabed pipelines in the North Sea include hydrodynamic forces due to residual, tidal and wave currents, the nature of seabed sediments and corrosion by seawater. Damage may be caused to pipelines by interaction with vessel anchors and with fishing gear. Special care has to be taken over the selection of the general area for the landfall of a pipeline and the engineering of the installation where the pipeline comes ashore. Trenching and other protection techniques for pipelines are discussed together with hydrostatic testing and commissioning and subsequent inspection, maintenance and repair. (UK)

  14. Northern pipelines : challenges and needs

    Energy Technology Data Exchange (ETDEWEB)

    Dean, D.; Brownie, D. [ProLog Canada Inc., Calgary, AB (Canada); Fafara, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2007-07-01

    Working Group 10 presented experiences acquired from the operation of pipeline systems in a northern environment. There are currently 3 pipelines operating north of 60, notably the Shiha gas pipeline near Fort Liard, the Ikhil gas pipeline in Inuvik and the Norman Wells oil pipeline. Each has its unique commissioning, operating and maintenance challenges, as well as specific training and logistical support requirements for the use of in-line inspection tools and other forms of integrity assessment. The effectiveness of cathodic protection systems in a permafrost northern environment was also discussed. It was noted that the delay of the Mackenzie Gas Pipeline Project by two to three years due to joint regulatory review may lead to resource constraints for the project as well as competition for already scarce human resources. The issue of a potential timing conflict with the Alaskan Pipeline Project was also addressed as well as land use issues for routing of supply roads. Integrity monitoring and assessment issues were outlined with reference to pipe soil interaction monitoring in discontinuous permafrost; south facing denuded slope stability; base lining projects; and reclamation issues. It was noted that automatic welding and inspection will increase productivity, while reducing the need for manual labour. In response to anticipated training needs, companies are planning to involve and train Aboriginal labour and will provide camp living conditions that will attract labour. tabs., figs.

  15. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  16. Withdrawal from labour force due to work disability in patients with ankylosing spondylitis

    NARCIS (Netherlands)

    Boonen, A.; Chorus, A.; Miedema, H.; van der Heijde, D.; Landewé, R.; Schouten, H.; van der Tempel, H.; van der Linden, S.

    2001-01-01

    To investigate withdrawal from the labour force because of inability to work owing to ankylosing spondylitis (AS) and to determine the characteristics of patients with no job because of work disability attributable to AS. A postal questionnaire was sent to 709 patients with AS aged 16-60 years

  17. Radiofrequency radiation: safe working practices in the Royal Australian Air Force

    International Nuclear Information System (INIS)

    Joyner, K.H.; Stone, K.R.

    1988-01-01

    The Royal Australian Air Force (RAAF) has long recognised the value of its work force and the need to preserve their health and wellbeing to achieve operational objectives. The Directorate of Air Force Safety (DAFS) is required by the Chief of the Air Staff to take all measures possible to prevent accidents and incidents in the RAAF, under the provisions of the Defence Instruction, 'Air Force Safety and Occupational Health Policy'. Consequently, the RAAF has exercised a pragmatic approach to radiofrequency radiation (RFR) and has always adopted and implemented strict exposure standards. DAFS receives technical advice on RFR from the Directorate of Telecommunications Engineering (DTELENG) and on occupational health from the Directorate General of Air Force Health Services (DGAFHS)

  18. Stabilizing and destabilizing forces in the nursing work environment: a qualitative study on turnover intention.

    Science.gov (United States)

    Choi, Sandy Pin-Pin; Pang, Samantha Mei-Che; Cheung, Kin; Wong, Thomas Kwok-Shing

    2011-10-01

    The nursing work environment, which provides the context of care delivery, has been gaining increasing attention in recent years. A growing body of evidence points to an inseparable link between attributes of the nursing work environment and nurse and patient outcomes. While most studies have adopted a survey design to examine the workforce and work environment issues, this study employed a phenomenological approach to provide empirical evidence regarding nurses' perceptions of their work and work environment. The aim of this study was to advance our understanding of the phenomenon of increasing nurse turnover through exploring frontline registered nurses' lived experiences of working in Hong Kong public hospitals. A modified version of Van Kaam's controlled explication method was adopted. Individual semi-structured interviews were conducted with 26 frontline nurses recruited from ten acute regional, district and non-acute public hospitals in Hong Kong. Their perspectives in regard to their work and work environment, such as workload, manpower demand and professional values, were extensively examined, and a hypothetical description relating the nursing work environment with nurses' turnover intention was posited. Contemplation of nurses' experiences revealed the vulnerable aspects of nursing work and six essential constituents of the nursing work environment, namely staffing level, work responsibility, management, co-worker relationships, job, and professional incentives. These essential constituents have contributed to two sets of forces, stabilizing and destabilizing forces, which originate from the attributes of the nursing work environment. Nurses viewed harmonious co-worker relationships, recognition and professional development as the crucial retaining factors. However, nurses working in an unfavorable environment were overwhelmed by destabilizing forces; they expressed frustration and demonstrated an intention to leave their work environment. The nursing

  19. Reduce operational cost and extend the life of pipeline infrastructure by automating remote cathodic protection systems

    Energy Technology Data Exchange (ETDEWEB)

    Rosado, Elroy [Freewave Technologies, Inc., Boulder, CO (United States). Latin America

    2009-07-01

    Energy and Pipeline Companies wrestle to control operating costs largely affected by new government regulations, ageing buried metal assets, rising steel prices, expanding pipeline operations, new interference points, HCA encroachment, restrictive land use policies, heightened network security, and an ageing soon-to-retire work force. With operating costs on the rise, seemingly out of control, many CP and Operations Professionals look to past best practices in cost containment through automation. Many companies achieve solid business results through deployment of telemetry and SCADA automation of remote assets and now hope to expand this success to further optimize operations by automating remote cathodic protection systems. This presentation will provide examples of how new remote cathodic protection systems are helping energy and pipeline companies address the growing issue of the aging pipeline infrastructure and reduce their costs while optimizing their operations. (author)

  20. Pipeline technology. Petroleum oil - long-distance pipelines. Pipelinetechnik. Mineraloelfernleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Krass, W; Kittel, A; Uhde, A

    1979-01-01

    All questions and concerns of pipeline technique are dealt with in detail. Some chapters can be applied for petroleum pipelines only or partly, for example the importance of petroleum pipelines, projecting, calculation, and operation. The sections of pipes and formings, laying, rights of way, and corrosion protection, accessories and remote effect technique, however, are of general interest, for example also for gas pipelines. In the chapter on working material, a very good summary of today's pipe working material including the thermomechanically treated steels is given. Besides methods of improving the toughness, the problems of the corrosion caused by strain cracking and the ways of avoiding it are pointed out. The pipe producing methods and, in the end of the chapter, the tests in the factory are explained. The section of laying deals with the laying methods being applied for years in pipeline construction, a big part referring to welding methods and tests. Active and passive corrosion protection are explained with all details. In addition to the solidity calculation presented with special regard to concerns of petroleum pipelines, theoretical fundaments and calculation methods for pressure are dealt with. Beside general questions of pumps, accessories, and drives, there is a section dealing with measurement and control techniques. Furthermore, remote effect and transmission techniques and news systems are explained in detail. Here, problems are referred to which are applicable not only to the operation of mineral oil pipelines. The book is completed by indications as to pipeline operation emphasizing general operation control, maintenance, repair methods and damage and their elimination. The last chapter contains a collection of the legal fundaments and the technical rules.

  1. Stabilité des pipelines non ensouillés. Etude bibliographique Stability of Unburied Pipelines. Bibliographic Study

    OpenAIRE

    Alliot J. M.

    2006-01-01

    The integrity of an unburied subsea pipeline depends to a very large extent on its stability on the seabed along its entire length. Hence the determination of this stability is of great importance in the engineering design of pipelines. This article proposes to examine the principal problems raised by the stability of unburied pipelines in the field of soil mechanics. These problems mainly concern the reactions of the soil to pipelines and their assessment, i. e. the forces of soil resistance...

  2. Instrumented Pipeline Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  3. Removable pipeline plug

    International Nuclear Information System (INIS)

    Vassalotti, M.; Anastasi, F.

    1984-01-01

    A removable plugging device for a pipeline, and particularly for pressure testing a steam pipeline in a boiling water reactor, wherein an inflatable annular sealing member seals off the pipeline and characterized by radially movable shoes for holding the plug in place, each shoe being pivotally mounted for self-adjusting engagement with even an out-of-round pipeline interior

  4. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  5. Developing pipeline risk methodology for environmental license permit; Metodologia para avaliacao do risco em dutos, no licenciamento ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Paulo; Naime, Andre [Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renovaveis (IBAMA), Brasilia, DF (Brazil). Diretoria de Licenciamento e Qualidade Ambiental; Serpa, Ricardo [Companhia de Tecnologia de Saneamento Ambiental (CETESB), Sao Paulo, SP (Brazil). Setor de Analise de Riscos; Mendes, Renato F. [PETROBRAS Engenharia, RJ (Brazil); Ventura, Gilmar [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Some new pipelines undertakings aim to establish connection between gas provinces in the Southeast and consumers in the Northeast of Brazil, in order to supply medium consuming centers and regions with minor potential of development. Consulting companies are carrying out Environmental Assessments studies and among them is the Risk Analyses of these pipeline transmission systems, in order to receive environmental permits by IBAMA, the Federal Brazilian Environmental Agency. In addition, existing interstate pipeline systems which are under IBAMA regulation will also require the same attention. For the purpose of defining a Pipeline Risk Analysis Protocol with methodology and risk criteria, with minimum risk analysis information on a comprehensive process, it has been decided for a 'tour de force' formed by experts from IBAMA and PETROBRAS engineers. The risk assessment protocol is focus on the risk to communities in the neighborhood of these pipelines and on the potential damage to the environment near and far from the ROW. The joined work ended up in two protocols, which attempt to provide environmental license permits for oil pipeline and gas pipelines with minimum contents for risk analysis studies. Another aspect is the environmental risk that has been focused on the contingency plan approach, since there are no consolidated environmental risk criteria for application as a common worldwide sense. The environmental risk mapping - MARA methodology will indicate areas with potential to be affected by leakages along a pipeline system. (author)

  6. Vale do Aco pipeline: pipeline natural gas implementation in ArcelorMittal Monlevade steel work; Gasoduto Vale do Aco: implantacao do gas natural via gasoduto na ArcelorMittal Monlevade

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Eduardo Sergio da Silva; Arantes, Luiz Flavio Mourao; Ribeiro, Vicente Aleixo Pinheiro [ArcelorMittal Monlevade, Joao Monlevade, MG (Brazil)

    2011-12-21

    Since September 2010, ArcelorMittal Monlevade has gained flexibility and an important opportunity to reduce the cost of its energy mix due to the arrival of the Natural Gas (NG) via Steel Valley Pipeline. The proposal of the project included the substitution of the Liquefied Petroleum Gas (LPG), Fuel Oil and Compressed Natural Gas for natural gas via pipeline. To support the investment decision, in addition to domestic economic and technical aspects, the macro economic environment concerning the NG was also taken into account. This paper shows the analysis for adjustment of internal equipment, the structure of the contract, the conceptual project of the gas distribution built inside the main events, the gains achieved, the alternatives for the acquisition of NG and operational flexibility of ArcelorMittal Monlevade in case of interruption of supply of natural gas. (author)

  7. Pipeline network and environment

    International Nuclear Information System (INIS)

    Oliveira Nascimento, I.; Wagner, J.; Silveira, T.

    2012-01-01

    The Rio de Janeiro is one of 27 units of Brazil. It is located in the eastern portion of the Southeast and occupies an area of 43 696.054 km², being effectively the 3rd smallest state in Brazil. This state in recent years has suffered from erosion problems caused by the deployment of the network pipeline. The deployment pipeline is part of the activities related to the oil industry has caused a more intense conflict between the environment and economic activities, modifying the soil structure and distribution of surface and subsurface flows. This study aimed to analyze the erosion caused by the removal of soil for the deployment of pipeline transportation, with the consequences of the emergence of numerous gullies, landslides and silting of rivers. For the development of this study were performed bibliographic research, field work, mapping and digital preparation of the initial diagnosis of active processes and what the consequent environmental impacts. For these reasons, we conclude that the problems could be avoided or mitigated if there was a prior geological risk management. (author)

  8. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  9. Myocardial infarction risk and psychosocial work environment: an analysis of the male Swedish working force.

    Science.gov (United States)

    Alfredsson, L; Karasek, R; Theorell, T

    1982-01-01

    The project was designed to test the assumption that certain psychosocial characteristics of occupational groups are associated with elevated myocardial infarction risk. All cases of myocardial infarction below the age of 65 in men living in the region of greater Stockholm during the years 1974-1976 were identified (deaths as well as survivals) in the official registries of hospitalizations and deaths. For each case two controls without infarction (in younger ages four) matched for age, area of residence and sex were selected randomly from the parish registries. For each case and control (n = 334 and 882, respectively) information was available regarding occupation. The psychosocial characteristics of each one of the 118 occupations were recorded by means of a nation wide interview survey (3876 working men) in 1977. Relative age-adjusted risks of developing a myocardial infarction were calculated for occupations in which many vs occupations in which few subjects reported a given characteristic (50% with most vs 50% with least). Shift work and monotony were associated with significant excess risk. Hectic work was not associated with excess risk by itself but in combination with variables associated with low decision latitude and/or few possibilities for growth it was associated with significant excess risk.

  10. Crude oil pipeline expansion summary

    International Nuclear Information System (INIS)

    2005-02-01

    The Canadian Association of Petroleum Producers has been working with producers to address issues associated with the development of new pipeline capacity from western Canada. This document presents an assessment of the need for additional oil pipeline capacity given the changing mix of crude oil types and forecasted supply growth. It is of particular interest to crude oil producers and contributes to current available information for market participants. While detailed, the underlying analysis does not account for all the factors that may come into play when individual market participants make choices about which expansions they may support. The key focus is on the importance of timely expansion. It was emphasized that if pipeline expansions lags the crude supply growth, then the consequences would be both significant and unacceptable. Obstacles to timely expansion are also discussed. The report reviews the production and supply forecasts, the existing crude oil pipeline infrastructure, opportunities for new market development, requirements for new pipeline capacity and tolling options for pipeline development. tabs., figs., 1 appendix

  11. Prerequisites and driving forces behind an extended working life among older workers.

    Science.gov (United States)

    Hovbrandt, Pia; Håkansson, Carita; Albin, Maria; Carlsson, Gunilla; Nilsson, Kerstin

    2017-11-28

    Reforms are changing pension systems in many European countries, in order to both restrict early retirement and force people to extend their working life. From occupational therapy and occupational science perspectives, studies focusing on aspects of working life that motivate the older worker is urgent. The aim was to describe incentives behind an extended working life among people over age 65. Focus group methodology was used, with participants ages 66-71, from varying work fields: construction and technical companies and the municipal elderly care sector. Work was considered important and valuable to the degree of how challenging work was, the possibilities for inclusion in a team of colleagues and the chances for better personal finances. Amongst all, the participants expressed a feeling of a strengthened identity by being challenged and having the opportunity to manage working tasks. The finding showed the actual reasons behind an extended working life among older workers. However, a risk of rising social inequity may appear with increased working life if older people are forced to extend their working life due to a difficult financial situation as a pensioner. A variety of retirement options and initiatives in order to support older workers are justified.

  12. Decomposition principles applied to the dynamic production and work-force scheduling problem

    NARCIS (Netherlands)

    Aardal, K.I.; Ari, A.

    1987-01-01

    One of the most important problems in the production and inventory planning field, is the scheduling of production and work force in a dynamic environment. Although this problem can be formulated as a linear program, it is often quite difficult to solve directly, due to its large scale. Instead, it

  13. The LOFAR Known Pulsar Data Pipeline

    NARCIS (Netherlands)

    Alexov, A.; Hessels, J.W.T.; Mol, J.D.; Stappers, B.; van Leeuwen, J.

    2010-01-01

    Abstract: Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being

  14. Pressure Transient Model of Water-Hydraulic Pipelines with Cavitation

    Directory of Open Access Journals (Sweden)

    Dan Jiang

    2018-03-01

    Full Text Available Transient pressure investigation of water-hydraulic pipelines is a challenge in the fluid transmission field, since the flow continuity equation and momentum equation are partial differential, and the vaporous cavitation has high dynamics; the frictional force caused by fluid viscosity is especially uncertain. In this study, due to the different transient pressure dynamics in upstream and downstream pipelines, the finite difference method (FDM is adopted to handle pressure transients with and without cavitation, as well as steady friction and frequency-dependent unsteady friction. Different from the traditional method of characteristics (MOC, the FDM is advantageous in terms of the simple and convenient computation. Furthermore, the mechanism of cavitation growth and collapse are captured both upstream and downstream of the water-hydraulic pipeline, i.e., the cavitation start time, the end time, the duration, the maximum volume, and the corresponding time points. By referring to the experimental results of two previous works, the comparative simulation results of two computation methods are verified in experimental water-hydraulic pipelines, which indicates that the finite difference method shows better data consistency than the MOC.

  15. Association of work-related stress with mental health problems in a special police force unit.

    Science.gov (United States)

    Garbarino, Sergio; Cuomo, Giovanni; Chiorri, Carlo; Magnavita, Nicola

    2013-01-01

    Law and order enforcement tasks may expose special force police officers to significant psychosocial risk factors. The aim of this work is to investigate the relationship between job stress and the presence of mental health symptoms while controlling sociodemographical, occupational and personality variables in special force police officers. At different time points, 292 of 294 members of the 'VI Reparto Mobile', a special police force engaged exclusively in the enforcement of law and order, responded to our invitation to complete questionnaires for the assessment of personality traits, work-related stress (using the Demand-Control-Support (DCS) and the Effort-Reward-Imbalance (ERI) models) and mental health problems such as depression, anxiety and burnout. Regression analyses showed that lower levels of support and reward and higher levels of effort and overcommitment were associated with higher levels of mental health symptoms. Psychological screening revealed 21 (7.3%) likely cases of mild depression (Beck Depression Inventory, BDI≥10). Officers who had experienced a discrepancy between work effort and rewards showed a marked increase in the risk of depression (OR 7.89, 95% CI 2.32 to 26.82) when compared with their counterparts who did not perceive themselves to be in a condition of distress. The findings of this study suggest that work-related stress may play a role in the development of mental health problems in police officers. The prevalence of mental health symptoms in the cohort investigated here was low, but not negligible in the case of depression. Since special forces police officers have to perform sensitive tasks for which a healthy psychological functioning is needed, the results of this study suggest that steps should be taken to prevent distress and improve the mental well-being of these workers.

  16. Leveraging educational, human resources, and organizational infrastructure to provide solutions to environmental remediation work force problems

    International Nuclear Information System (INIS)

    Hayward, G.B.; Kinsel, W.

    1991-01-01

    The field of environmental engineering and environmental science is so new that many colleges and universities have only begun the process of bringing academic program, into their areas. Many professional personnel don't need full degree programs but may need only certain courses to enhance their skills in the environmental area. This article discusses the partnership between the Hanford contractors, DOE-RL, and Washington State University in an innovative way in solving a portion of the remediation work force problems

  17. Stress and thermal expansion numerical analysis of subsea buried pipelines; Analise numerica de tensoes e expansao termica de dutos submarinos enterrados

    Energy Technology Data Exchange (ETDEWEB)

    Souto, Marcio de S.; Vaz, Murilo A. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia; Solano, Rafael F. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The design of Capixaba North Terminal pipelines (TNC) became very complex, once the pipelines are exposed to elevated temperature variations. As the pipelines are buried, the interaction with the seabed can become critical with the thermal expansion development, since an axial compressive force arise, reaching critical values and then leading the pipeline to the thermo mechanical instability phenomenon. To minimize these effects, the pipeline will cross the shore approach through a horizontal directional drilling, and expansion loops and intermediate tie-ins took place on his route in order to permit pipeline displacements, working thermally. The objective of this present work is to develop a numerical model, able to analyze the entire pipeline stress, strain and displacements, considering different kinds of soil along of his route. The influence of expansion loops is evaluated and a comparative analysis in order to discover the minimum curvature radius at the directional drilling region is carried out. This study defines a methodology based on the developed numerical model which will be extended to future applications in subsea buried pipeline design. (author)

  18. Diagnosing plant pipeline system performance using radiotracer techniques

    Energy Technology Data Exchange (ETDEWEB)

    Kasban, H.; Ali, Elsayed H.; Arafa, H. [Engineering Department, Nuclear Research Center, Atomic Energy Authority, Inshas (Egypt)

    2017-02-15

    This study presents an experimental work in a petrochemical company for scanning a buried pipeline using Tc{sup 99m} radiotracer based on the measured velocity changes, in order to determine the flow reduction along a pipeline. In this work, Tc{sup 99m} radiotracer was injected into the pipeline and monitored by sodium iodide scintillation detectors located at several positions along the pipeline. The flow velocity has been calculated between every two consecutive detectors along the pipeline. Practically, six experiments have been carried out using two different data acquisition systems, each of them being connected to four detectors. During the fifth experiment, a bypass was discovered between the scanned pipeline and another buried parallel pipeline connected after the injection point. The results indicate that the bypass had a bad effect on the volumetric flow rate in the scanned pipeline.

  19. HIGHLY QUALIFIED WORKING FORCE – KEY ELEMENT OF INNOVATIVE DEVELOPMENT MODEL

    Directory of Open Access Journals (Sweden)

    M. Avksientiev

    2014-12-01

    Full Text Available Highly qualified working force is a central element of intensive development model in modern society. The article surveys the experience of countries that managed to transform their economy to the innovative one. Ukrainian economy cannot stand aside processes that dominate the world economy trends, thus we are to use this experience to succeed in future. Today any government of the world is facing challenges that occur due to transformation of the economy into informational one. This type of economy causes its transformation form extensive to intensive one. The main reasons under that is limitation of nature resources, material factors of production. Thus this approach depends much on the quality of working force. Unfortunately in Ukraine there is a misbalance in specialist preparation. This puts additional pressure on the educational sphere also. In order to avoid this pressure we are to conduct reforms in education sphere. Nowadays, in the world views and concepts of governmental role in the social development are changing. This why, even at times of economic recession educational costs are not reduced under the new economical doctrine in the EU. Highly qualified specialists, while creating new products and services play role of engineers in XXI century. They are to lead their industries to world leading positions. From economic point of view, highly qualified specialists benefit society with higher income rates, taxation and thus, increasing the living standards in society. Thus, the majority if modern scientists prove the importance of highly trained working force for more effective economic development.

  20. Work function of few layer graphene covered nickel thin films measured with Kelvin probe force microscopy

    Energy Technology Data Exchange (ETDEWEB)

    Eren, B. [Department of Physics, University of Basel, Klingelbergstrasse 82, CH-4056 Basel (Switzerland); Material Sciences Division, Lawrence Berkeley National Laboratory, 1 Cyclotron Road, Berkeley, California 94720 (United States); Gysin, U.; Marot, L., E-mail: Laurent.marot@unibas.ch; Glatzel, Th.; Steiner, R.; Meyer, E. [Department of Physics, University of Basel, Klingelbergstrasse 82, CH-4056 Basel (Switzerland)

    2016-01-25

    Few layer graphene and graphite are simultaneously grown on a ∼100 nm thick polycrystalline nickel film. The work function of few layer graphene/Ni is found to be 4.15 eV with a variation of 50 meV by local measurements with Kelvin probe force microscopy. This value is lower than the work function of free standing graphene due to peculiar electronic structure resulting from metal 3d-carbon 2p(π) hybridization.

  1. Emergency preparedness of OSBRA Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Milton P.; Torres, Carlos A.R.; Almeida, Francisco J.C. [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO in the preparation for emergencies in the OSBRA pipeline, showing specific aspects and solutions developed. The company has a standardized approach for the emergency management, based on risk analysis studies, risk management plan and contingency plans. To cover almost 1,000 km of pipeline, the Company avails of Emergency Response Centers and Environmental Defense Center, located at strategic points. In order to achieve preparation, fire fighting training and oil leakage elimination training are provided. Additionally, simulation exercises are performed, following a schedule worked out according to specific criteria and guidelines. As a conclusion, a picture is presented of the evolution of the preparation for emergencies in the OSBRA System which bears the enormous responsibility of transporting flammable products for almost 1,000 km of pipeline, crossing 40 municipalities, 3 states and the Federal District. (author)

  2. Repair methods for damaged pipeline beyond diving depth

    OpenAIRE

    Mohammadi, Keramat

    2011-01-01

    Master's thesis in Offshore Technology Mechanical damage of a subsea pipeline is found as one of the most severe concern in management of pipeline integrity. The need to reach and bring the hydrocarbons from the fields located in deep and ultra-deep waters, imposes the need to improve the technologies and techniques in order to repair any unacceptable damage in pipeline. The main objective of this work is to investigate various methods for repairing a subsea pipeline that has been damaged ...

  3. ORAC-DR: A generic data reduction pipeline infrastructure

    Science.gov (United States)

    Jenness, Tim; Economou, Frossie

    2015-03-01

    ORAC-DR is a general purpose data reduction pipeline system designed to be instrument and observatory agnostic. The pipeline works with instruments as varied as infrared integral field units, imaging arrays and spectrographs, and sub-millimeter heterodyne arrays and continuum cameras. This paper describes the architecture of the pipeline system and the implementation of the core infrastructure. We finish by discussing the lessons learned since the initial deployment of the pipeline system in the late 1990s.

  4. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  5. Increase of ecological safety of the pipeline

    International Nuclear Information System (INIS)

    Dr Movsumov, Sh.N.; Prof Aliyev, F.G.

    2005-01-01

    Full text : For increase of ecological safety of the pipeline, necessary decrease of damage (risk) rendered by the pipeline on surrounding natural environment which depends: on the frequency of damage of the pipeline; on the volume poured oil; on the factor of sensitivity of an environment where flood of oil was. Frequency of damage of the pipeline depends on physico-chemical properties of a material of the pipeline, from its technical characteristics (thickness of a wall, length of a pipe, working pressure), on the seismic area of the district where the pipeline passed and also on the way of lining of the pipeline (underground or overground). The volume poured oil depends on diameter of the received damage, from stability of the pipeline mechanical and other external actions, from an ambient temperature, from capacity of the pipeline, from distance between the latches established in the pipeline, and also from time, necessary for their full closing. The factor of sensitivity of environment depends on geological structure and landscapes of district (mountain, the river, settlements) where passed the pipeline. At designing the pipeline, in report is shown questions of increase of ecological safety of the pipeline are considered at his construction and exploitation. For improvement of ecological safety of the pipeline is necessary to hold the following actions: Ecological education of the public, living near along a line of the oil pipeline; carrying out ecological monitoring; working of the public plan of response to oil spills; For ecological education of the public is necessary: carrying out informing of the public for all (technical, ecological, social and economic and legal) questions connected to an oil pipeline, and also on methods of protection of the rights at participation in acceptance of ecological significant decisions; Creation of public groups for realization of activity on observance of the legislation and to prevention of risks; Exposure of hot

  6. Proposal of methodology for to implement system of environmental management at works of pipeline; Proposta de metodologia para implementacao de SGA - Sistema de Gestao Ambiental em obras de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Rita de Cassia de Souza [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Proposal presentation of the methodology to implements the environmental management system in works of pipelines with the objective to guarantee the efficacy in the management of the environmental impact and aspects of the activities of the construction and assembly of pipelines, identifiable through the environmental impact study. It initially makes brief explanation over the environmental national politics through of some topics of the mains generals norms of the legislation. After them, the presentation of the methodology through the model of management PDCA: Plan - Do - Check - Act, recommended for the ABNT NBR ISO 14001:2004. For each stage of the model are listed the activities and, of exceptional manner, it makes explanation of the environmental performance evaluation, accordant the ABNT NBR ISO 10031:2004. (author)

  7. Ergonomics strategies and actions for achieving productive use of an ageing work-force.

    Science.gov (United States)

    Kumashiro, M

    2000-07-01

    In this report, a basic ERGOMA (Ergonomics in Industrial Management) strategy is proposed as a policy for corporate production and employment in countries where ageing populations and reduced birth rates are imminent, and a strategy related to this is proposed. Specifically, as a strategy at the company level, the results of survey studies aimed at the development of methods for determining job capacity, to enable effective use of the labour of ageing workers, were summarized. A number of the insights gained here are steps in the development of a foundational methodology for practical use, and in actual practice a number of these insights must be subjected to measurements. However, the theory and newly developed methodology described here are thought to represent significant changes from the approaches to job capacity diagnosis and assessment published in the past and from the stance towards utilization of an ageing work-force. The author is confident that this represents new progress in one of the ergonomics approach to dealing with the working environment of ageing workers and an ageing work-force in general.

  8. Implementing an X-ray validation pipeline for the Protein Data Bank

    International Nuclear Information System (INIS)

    Gore, Swanand; Velankar, Sameer; Kleywegt, Gerard J.

    2012-01-01

    The implementation of a validation pipeline, based on community recommendations, for future depositions of X-ray crystal structures in the Protein Data Bank is described. There is an increasing realisation that the quality of the biomacromolecular structures deposited in the Protein Data Bank (PDB) archive needs to be assessed critically using established and powerful validation methods. The Worldwide Protein Data Bank (wwPDB) organization has convened several Validation Task Forces (VTFs) to advise on the methods and standards that should be used to validate all of the entries already in the PDB as well as all structures that will be deposited in the future. The recommendations of the X-ray VTF are currently being implemented in a software pipeline. Here, ongoing work on this pipeline is briefly described as well as ways in which validation-related information could be presented to users of structural data

  9. Implementing an X-ray validation pipeline for the Protein Data Bank

    Energy Technology Data Exchange (ETDEWEB)

    Gore, Swanand; Velankar, Sameer; Kleywegt, Gerard J., E-mail: gerard@ebi.ac.uk [EMBL–EBI, Wellcome Trust Genome Campus, Hinxton, Cambridge CB10 1SD (United Kingdom)

    2012-04-01

    The implementation of a validation pipeline, based on community recommendations, for future depositions of X-ray crystal structures in the Protein Data Bank is described. There is an increasing realisation that the quality of the biomacromolecular structures deposited in the Protein Data Bank (PDB) archive needs to be assessed critically using established and powerful validation methods. The Worldwide Protein Data Bank (wwPDB) organization has convened several Validation Task Forces (VTFs) to advise on the methods and standards that should be used to validate all of the entries already in the PDB as well as all structures that will be deposited in the future. The recommendations of the X-ray VTF are currently being implemented in a software pipeline. Here, ongoing work on this pipeline is briefly described as well as ways in which validation-related information could be presented to users of structural data.

  10. Best practices for the abandonment of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mackean, M; Reed, R; Snow, B [Nabors Canada, Calgary, AB (Canada). Abandonrite Service

    2006-07-01

    Pipeline regulations implemented in 2006 require that licensees register all pipelines. Training must also be provided for ground disturbance supervisors. In addition, signage must be maintained on abandoned pipelines, and discontinued pipelines must be properly isolated. Corrosion control and internal inhibition is required for discontinued lines. However, pipelines are often neglected during the well abandonment process. This presentation provided recommendations for coordinating well and pipeline abandonment processes. Pipeline ends can be located, depressurized, flushed and purged while wells are being abandoned. Contaminated soils around the wells can also be identified prior to reclamation activities. Administrative reviews must be conducted in order to provide accurate information on pipeline location, reclamation certification, and line break history. Field operation files must be reviewed before preliminary field work is conducted. Site inspections should be used to determine if all ends of the line are accessible. Landowners and occupants near the line must also be notified, and relevant documentation must be obtained. Skilled technicians must be used to assess the lines for obstructions as well as to cut and cap the lines after removing risers. The presentation also examined issues related to pressure change, movement, cold tapping, and live dead legs. tabs., figs.

  11. Canadian pipeline transportation system : transportation assessment

    International Nuclear Information System (INIS)

    2009-07-01

    In addition to regulating the construction and operation of 70,000 km of oil and natural gas pipelines in Canada, the National Energy Board (NEB) regulates the trade of natural gas, oil and natural gas liquids. This report provided an assessment of the Canadian hydrocarbon transportation system in relation to its ability to provide a robust energy infrastructure. Data was collected from NEB-regulated pipeline companies and a range of publicly available sources to determine if adequate pipeline capacity is in place to transport products to consumers. The NEB also used throughput and capacity information received from pipeline operators as well as members of the investment community. The study examined price differentials compared with firm service tolls for transportation paths, as well as capacity utilization on pipelines and the degree of apportionment on major oil pipelines. This review indicated that in general, the Canadian pipeline transportation system continues to work effectively, with adequate pipeline capacity in place to move products to consumers who need them. 9 tabs., 30 figs., 3 appendices.

  12. Full-Scale Testing of Pipeline Unplugging Technologies - NuVision's Fluidic Wave-Action Technology

    International Nuclear Information System (INIS)

    Gokaltun, S.; McDaniel, D.; Varona, J.; Patel, R.; Awwad, A.; Roelant, D.; Keszler, E.

    2009-01-01

    In this paper, we present a technical evaluation of a pipeline unplugging method that can be used as a feasible tool to clean fouled pipes at Department of Energy (DOE) sites. The unplugging method depends on running water against the plugged section in the pipeline for multiple times and breaking the mechanical bonds of the material that hold the plug together. The working principles of the method are similar to beach erosion since a water wave is generated using the suction and drive mechanisms caused by the system in the pipeline that erodes the plug from one end. The technology tested also is capable of creating an external force on the plug that helps the unplugging process however this characteristic of the technology was not tested during the testing reported in this work. More focus was given to the erosion capability of the technology and how wave characteristics affected that. Results obtained demonstrated that there is a correlation between the suction and drive characteristics of the wave generated in the pipeline with the maximum pressures attained in the plug region, the velocity of the wave prior to colliding with the plug and the erosion. It was found that the technology was most effective in unplugging Phosphate based chemical plugs and Kaolin clay based plugs while it took more time to erode Aluminum based plugs for the same pipeline test layouts. (authors)

  13. New Forces at Work in Mining: Industry View of Critical Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, D. J. [Science and Technology Policy Inst., Arlington, VA (United States); LaTourrette, Tom [Science and Technology Policy Inst., Arlington, VA (United States); Bartis, James T. [Science and Technology Policy Inst., Arlington, VA (United States)

    2007-04-01

    RAND has just published a report entitled, "New Forces at Work in Mining: Industry Views of Critical Technologies," by D. J. Peterson, Tom LaTourrette, and James T. Bartis. The report presents the results of a series of in-depth discussions with leading mining industry representatives selected for their prominent position and their ability to think broadly about technology trends. The discussions highlighted the importance of collaborative technology research, development, and implementation strategies and the increasingly critical role of mine personnel in the utilization of new technologies.

  14. Gender and beliefs about work force discrimination in the United States and Australia.

    Science.gov (United States)

    Browne, B A

    1997-02-01

    Beliefs about gender discrimination in the work force were investigated among a sample of American (n = 201) and Australian (n = 177) business students. Significant differences between genders in beliefs about the existence of gender discrimination were indicated, with women being more likely than men to affirm its existence, particularly in the area of salary discrimination. In addition, there were differences between genders and between countries in assessment of the factors that might lead to lower participation of women in management and in the assessment of avenues of advancement for women.

  15. Partnership working as liberation psychology: Forced labor among UK Chinese migrant workers.

    Science.gov (United States)

    Lawthom, Rebecca; Kagan, Carolyn; Burton, Mark; Lo, Sandy; Mok, Lisa; Sham, Sylvia; Baines, Sue; Greenwood, Mark

    2017-01-01

    In this article we seek to reflect critically on some recent research we have carried out, in collaboration with a Chinese welfare NGO, on the experience of forced labor among Chinese migrant workers in the UK. We will (a) locate briefly the wider political context of migrant work (both regular and irregular) in the UK; (b) explore how and why the actual research methods and process of the research deviated in practice from those that were planned; and (c) show the extent to which aspects of the research process reflected a liberation psychology perspective.

  16. Pipelines 'R' us

    International Nuclear Information System (INIS)

    Thomas, P.

    1997-01-01

    The geopolitical background to the export of oil and gas from Kazakhstan by pipeline is explored with particular reference to the sensitivities of the USA. There are now a number of pipeline proposals which would enable Kazakhstan to get its hydrocarbons to world markets. The construction of two of these formed part of a major oil deal signed recently with China in the face of stiff competition from major US companies. The most convenient and cost effective route, connecting up with Iran's existing pipeline network to the Gulf, is unlikely to be developed given continuing US sanctions against Iran. Equally unlikely seems to be the Turkmenistan to Pakistan pipeline in the light of the political volatility of Afghanistan. US companies continue to face limits on export capacity via the existing Russian pipelines from Kazakhstan. A temporary solution could be to carry some oil in the existing pipeline from Azerbaijan to Georgia which has been upgraded and is due to become operational soon, and later in a second proposed pipeline on this route. The Caspian Pipeline Consortium, consisting of three countries and eleven international companies, is building a 1500 km pipeline from the Tergiz field to Novorossiysk on the Black Sea with a view to completion in 2000. An undersea pipeline crossing the Caspian from Azerbaijan is being promoted by Turkey. There is an international perception that within the next five years Kazakhstan could be in a position to export its oil via as many as half a dozen different routes. (UK)

  17. Canine Supply for Physical Security: An Analysis of the Royal Australian Air Force Military Working Dog Program

    Science.gov (United States)

    2016-03-01

    PHYSICAL SECURITY: AN ANALYSIS OF THE ROYAL AUSTRALIAN AIR FORCE MILITARY WORKING DOG PROGRAM by Mark W. Powell March 2016 Thesis...AN ANALYSIS OF THE ROYAL AUSTRALIAN AIR FORCE MILITARY WORKING DOG PROGRAM 5. FUNDING NUMBERS 6. AUTHOR(S) Mark W. Powell 7. PERFORMING...increased demand on its physical security elements. Its military working dog (MWD) workforce is required to meet an inventory of 204 by end of year 2023 as

  18. A socioecological analysis of the determinants of national public health nutrition work force capacity: Australia as a case study.

    Science.gov (United States)

    Hughes, Roger

    2006-01-01

    This article uses a socioecological analytical approach to assess the capacity of the public health nutrition work force in Australia as a prelude to work force development strategy planning. It demonstrates how the socioecological model can be used to assess and inform the development of the infrastructure required for effective public health nutrition effort. An interpretive case study method was used involving triangular analysis of quantitative and qualitative data from multiple sources including semistructured interviews with advanced-level practitioners, literature review, a cross-sectional national work force survey, and position description audit and consensus development using a Delphi study. The findings of this analysis indicate that the Australian public health nutrition work force's capacity to effectively address priority nutrition issues is limited by determinants that can be categorized as relating to human resource infrastructure, organizational and policy environments, intelligence access and use, practice improvement and learning systems, and work force preparation. This socioecological analysis supports an intelligence-based focus for work force development effort in Australia and a conceptual framework for work force capacity assessment with potential applications in other countries.

  19. Diagnostic Inspection of Pipelines for Estimating the State of Stress in Them

    Science.gov (United States)

    Subbotin, V. A.; Kolotilov, Yu. V.; Smirnova, V. Yu.; Ivashko, S. K.

    2017-12-01

    The diagnostic inspection used to estimate the technical state of a pipeline is described. The problems of inspection works are listed, and a functional-structural scheme is developed to estimate the state of stress in a pipeline. Final conclusions regarding the actual loading of a pipeline section are drawn upon a cross analysis of the entire information obtained during pipeline inspection.

  20. Analysis of the generation and monitoring of impact on fauna in the gas pipeline works in the current environmental legislation; Analise da geracao e monitoramento do impacto sobre a fauna silvestre em obras de gasodutos face a legislacao ambiental vigente

    Energy Technology Data Exchange (ETDEWEB)

    Caldas, Flaviana V.; Serricchio, Claudio [PETROBRAS, Rio de Janeiro, RJ (Brazil); Akahori, Lisa [TELSAN Engenharia e Servicos Ltda, Vitoria, ES (Brazil); Nascimento, Reinaldo R. [IMC Saste - Construcoes, Servicos e Comercio Ltda., Sao Paulo, SP (Brazil)

    2008-07-01

    The impacts to wildlife in areas where gas pipelines will be implemented are considerable, changing the existing balance. The main environmental measure adopted in the cases is the deployment of the Fauna Management Programme. This programme is sub - divided into two: Monitoring and Rescue of the fauna. The tracking step starts before the installation of the venture, with the completion of a first in order to identify the impacts before the venture, and finishes two years after the end of the works. These studies are based on guidelines set in the Normative Instruction of the environmental licensor agency, in which the criteria for implementation are restrictive, often without making a license agency distinction of methodology for enterprises with different characteristics. This article intended to review the criteria and the procedures established by the legislation and its real applicability in gas pipeline projects face to the environmental impacts identified to this activity. For this analysis, the methodology used was the case study of two gas pipelines: Cabiunas - Vitoria (GASCAV) and Cacimbas - Catu (GASCAC). The results allowed to conclude that the actions developed to the Sub-Programme of Rescue of the fauna are satisfactory to control environmental impacts and that the Sub-Programme of Monitoring of the fauna just confirm behaviors and information's previous detected. (author)

  1. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    Energy Technology Data Exchange (ETDEWEB)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes

  2. Applications of UT results to confirm defects findings by utilization of relevant metallurgical investigations techniques on gas/condensate pipeline working in wet sour gas environment

    Science.gov (United States)

    El-Azhari, O. A.; Gajam, S. Y.

    2015-03-01

    The gas/condensate pipe line under investigation is a 12 inch diameter, 48 km ASTM, A106 steel pipeline, carrying hydrocarbons containing wet CO2 and H2S.The pipe line had exploded in a region 100m distance from its terminal; after 24 years of service. Hydrogen induced cracking (HIC) and sour gas corrosion were expected due to the presence of wet H2S in the gas analysis. In other areas of pipe line ultrasonic testing was performed to determine whether the pipeline can be re-operated. The results have shown presence of internal planner defects, this was attributed to the existence of either laminations, type II inclusions or some service defects such as HIC and step wise cracking (SWC).Metallurgical investigations were conducted on fractured samples as per NACE standard (TM-0284-84). The obtained results had shown macroscopic cracks in the form of SWC, microstructure of steel had MnS inclusions. Crack sensitivity analyses were calculated and the microhardness testing was conducted. These results had confirmed that the line material was suffering from sour gas deteriorations. This paper correlates the field UT inspection findings with those methods investigated in the laboratory. Based on the results obtained a new HIC resistance material pipeline needs to be selected.

  3. Decontamination device for pipeline

    International Nuclear Information System (INIS)

    Harashina, Heihachi.

    1994-01-01

    Pipelines to be decontaminated are parts of pipelines contaminated with radioactive materials, and they are connected to a fluid transfer means (for example, a bladeless pump) and a ball collector by way of a connector. The fluid of a mixture of chemical decontaminating liquid and spheres is sent into pipelines to be decontaminated. The spheres are, for example, heat resistant porous hard or soft rubber spheres. The fluid discharged from the pipelines to be decontaminated are circulated by way of bypassing means. The inner surface of the pipelines is decontaminated by the circulation of the fluid. When the bypass means is closed, the fluid discharged from the pipelines to be decontaminated is sent to the ball collector, and the spheres are captured by a hopper. Further, the liquid is sent to the filtrating means to filter the chemical contaminating liquid, and sludges contained in the liquid are captured. (I.N.)

  4. New EN standards for flanges and weld-on fittings now in force. Tricky in the detail, but design of a pipeline entirely in conformity to European codes and standards is possible; Neue EN-Normen fuer Flansche und Schweissfittings in Kraft. Tuecken im Detail, aber die Konstruktion einer Rohrleitung komplett nach Europaeischem Regelwerk wird moeglich

    Energy Technology Data Exchange (ETDEWEB)

    Willauschus, A. [BUHLMANN Rohr-Fittings-Stahlhandel GmbH und Co. KG, Hilden (Germany)

    2008-07-15

    The second edition of EN 1092, Part 1, 'Circular steel flanges', with date of issue November, 2007, the calculation rules of which are now based on the Woelfel-formulae, is now in force. This new edition had become necessary because the June 2002 edition was, indeed, based on EN 1591 as a calculation tool, but only flanges up to DN 600 had been calculated. Rapid establishment of the new EN 1092, Part 1, on the market can be anticipated following this new edition, since the new pipe classes of the chemicals industry, published in PAS 1057, are based on the new EN 1092, Part 1, and BASF has now also become the first major chemicals corporation to convert its flange ordering to this EN standard, starting in early 2008. From 2009 onward, all other major chemicals companies, which drafted PAS 1057 jointly in the 'Pipelines Working Committee' within the 'Process-Engineering Corporation of BDI', will successively follow. The 'Specialist Confederation for Steel Flanges' is also already working on a new flange catalogue based on EN 1092, Part 1. (orig.)

  5. Ballasting pipeline moving in horizontal well as method of control sticking phenomenon

    Science.gov (United States)

    Toropov, V. S.; Toropov, E. S.

    2018-05-01

    The mechanism of the phenomenon of sticking a pipeline moving in a well while pulled by the facility horizontal directional drilling is investigated. A quantitative evaluation of the force arising from sticking is given. At the same time, the working hypothesis takes a view of the combined effect of adhesion and friction interactions as the reasons that cause this phenomenon. As a measure to control the occurrence of sticking and to reduce the resistance force to movement of the pipeline in the well, several methods of ballasting the working pipeline are proposed, depending on the profile of the well and the ratio of the length of the curved sections of the inlet and outlet and the straight horizontal sections of the profile. It is shown that for crossings, which profile contains an extended horizontal section, it is possible to partially fill the pipeline with water to achieve zero buoyancy, and for crossings with curvature along the entire profile, the ballasting efficiency will be minimal.

  6. Economic evaluation of CO2 pipeline transport in China

    International Nuclear Information System (INIS)

    Zhang Dongjie; Wang Zhe; Sun Jining; Zhang Lili; Li Zheng

    2012-01-01

    Highlights: ► We build a static hydrodynamic model of CO 2 pipeline for CCS application. ► We study the impact on pressure drop of pipeline by viscosity, density and elevation. ► We point out that density has a bigger impact on pressure drop than viscosity. ► We suggest dense phase transport is preferred than supercritical state. ► We present cost-optimal pipeline diameters for different flowrates and distances. - Abstract: Carbon capture and sequestration (CCS) is an important option for CO 2 mitigation and an optimized CO 2 pipeline transport system is necessary for large scale CCS implementation. In the present work, a hydrodynamic model for CO 2 pipeline transport was built up and the hydrodynamic performances of CO 2 pipeline as well as the impacts of multiple factors on pressure drop behavior along the pipeline were studied. Based on the model, an economic model was established to optimize the CO 2 pipeline transport system economically and to evaluate the unit transport cost of CO 2 pipeline in China. The hydrodynamic model results show that pipe diameter, soil temperature, and pipeline elevation change have significant influence on the pressure drop behavior of CO 2 in the pipeline. The design of pipeline system, including pipeline diameter and number of boosters etc., was optimized to achieve a lowest unit CO 2 transport cost. In regarding to the unit cost, when the transport flow rate and distance are between 1–5 MtCO 2 /year and 100–500 km, respectively, the unit CO 2 transport cost mainly lies between 0.1–0.6 RMB/(tCO 2 km) and electricity consumption cost of the pipeline inlet compressor was found to take more than 60% of the total cost. The present work provides reference for CO 2 transport pipeline design and for feasibility evaluation of potential CCS projects in China.

  7. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  8. Inspector General, DOD, Oversight of the Air Force Audit Agency Audit of the FY 1999 Working Capital Fund Financial Statements

    National Research Council Canada - National Science Library

    Lane, F

    2000-01-01

    An audit of the Air Force Working Capital Fund financial statements is required by Public Law 101-576, the "Chief Financial Officers Act of 1990," November 15, 1990, as amended by Public Law 103-356...

  9. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  10. Uranium mining and milling work force characteristics in the western US

    International Nuclear Information System (INIS)

    Rapp, D.A.

    1980-12-01

    This report presents the results of a survey of the socioeconomic characteristics associated with 11 uranium mine and mill operations in 5 Western States. Comparisons are made with the socioeconomic characteristics of construction and operating crews for coal mines and utility plants in eight Western States. Worker productivity also is compared with that in similar types of coal and uranium mining operations. We found that there existed no significant differences between the socioeconomic characteristics of construction and operating crews and the secondary employment impacts associated with uranium mines and mills when compared with those associated with coal mines and utility plants requiring similar skills at comparable locations. In addition, our survey includes a comparison of several characteristics associated with the households of basic and nonbasic work forces and concludes that significant changes have occurred in the last 5 yr. Accordingly, we recommend additional monitoring and updating of data used in several economic forecasting models to avoid unwarranted delays in achieving national energy goals

  11. Seismic response of buried pipelines: a state-of-the-art review

    International Nuclear Information System (INIS)

    Datta, T.K.

    1999-01-01

    A state-of-the-art review of the seismic response of buried pipelines is presented. The review includes modeling of soil-pipe system and seismic excitation, methods of response analysis of buried pipelines, seismic behavior of buried pipelines under different parametric variations, seismic stresses at the bends and intersections of network of pipelines. pipe damage in earthquakes and seismic risk analysis of buried pipelines. Based on the review, the future scope of work on the subject is outlined. (orig.)

  12. Slurry pipeline design approach

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy; Navarro R, Luis [Brass Chile S.A., Santiago (Chile)

    2009-12-19

    Compared to other engineering technologies, the design of a commercial long distance Slurry Pipeline design is a relatively new engineering concept which gained more recognition in the mid 1960 's. Slurry pipeline was first introduced to reduce cost in transporting coal to power generating units. Since then this technology has caught-up worldwide to transport other minerals such as limestone, copper, zinc and iron. In South America, the use of pipeline is commonly practiced in the transport of Copper (Chile, Peru and Argentina), Iron (Chile and Brazil), Zinc (Peru) and Bauxite (Brazil). As more mining operations expand and new mine facilities are opened, the design of the long distance slurry pipeline will continuously present a commercially viable option. The intent of this paper is to present the design process and discuss any new techniques and approach used today to ensure a better, safer and economical slurry pipeline. (author)

  13. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  14. Preparedness and Practice Management Skills of Graduating Dental Students Entering the Work Force

    Directory of Open Access Journals (Sweden)

    Jane Manakil

    2015-01-01

    Full Text Available Dental education aims to produce competent graduates with the ability to provide quality care to the patients and facilitate the smooth integration into professional practice. The objective of this study was to explore the overall preparedness of graduands for integrating into professional practice. The survey was tested for reliability and analysed the career paths, learning preferences, overall knowledge, and confidence amongst graduating dentists in integrating and managing a dental practice on graduation. Sixty-nine students (89.6% in age group of 20–50 years participated in the study. Students indicated a high level of confidence in their skills and ability to work in a team in a practice or collaboratively with other colleagues and specialists but expressed some reservation on their practice management skills (73.1%. Challenges in gaining employment and pressures to repay educational debts are amongst the reasons for graduands preferring a paid job immediately on graduation regardless of demographics. Students indicated that an increase in speciality training and clinical/outreach placements could enhance employability. This study explores the students’ perception of their confidences, knowledge, learning preferences, and practice management skills as a method of evaluating their preparedness to practice on graduation and provides a base line for curriculum structuring to prepare graduands to enter the competitive dental work force.

  15. Becoming a member of the work force: perceptions of adults with Asperger Syndrome.

    Science.gov (United States)

    Krieger, Beate; Kinébanian, Astrid; Prodinger, Birgit; Heigl, Franziska

    2012-01-01

    Research has shown that comparatively few adults with Asperger Syndrome (AS) participate in the competitive work force. The purpose of this study was to gain in-depth knowledge about contextual factors, which contribute to successful labor market participation in some adults with AS. This study was conducted by indepth-interviewing six adults with AS working in the competitive job market in Switzerland. A developmental and hermeneutic narrative approach was used for data collection and analysis. Two in-depth narrative interviews were conducted with each participant. A narrative analysis according to the theories of Paul Ricoeur was performed. Results showed that participants received pre-vocational requisites during their childhood through parents and friends that provided a feeling of security in social contexts. For participants, a supportive school setting resulted in academic achievements. The narratives reveal participants' capacities for understanding and adapting to social norms. Participants' understanding of their own needs was essential to the successful labor market participation. However, disclosure is rare and social stigma is still present. This study showed that successful labor participation of adults with AS can be enhanced through adequate social support already in the early stages of an individual's lifetime.

  16. Citizenship program in near communities of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mascarenhas, Carina R.; Vilas Boas, Ianne P. [TELSAN Engenharia, Belo Horizonte, MG (Brazil); Bourscheid, Pitagoras [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    During the construction of a pipeline, the IENE - Engineering Unit of PETROBRAS, responsible for the construction and erection of pipelines and related plants in northeastern Brazil, crossed more than 7 states and 250 counties, had implemented a social responsibility program, in special a citizenship program. This action was the result of community studies located near of the pipelines AID - Direct Influence Area (438 yards right and left of the pipeline) and through the evidence that those locations were poor and have no personal documents and citizen position in society. This paper intents to share the experience of IENE about its citizen program that worked in three big lines: community mobilization; citizenship qualification; and citizenship board. This last one, turns possible to people obtains theirs personal documents and exercise the plenitude of citizenship. (author)

  17. Challenges and difficulties in service to legal requirements applicable to a pipeline works at the Amazon rain forest, Brazil; Os desafios e dificuldades no atendimento aos requisitos legais aplicaveis a uma obra na Amazonia

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Wanderleia I.P. de [Universidade do Estado do Amazonas (UEA), Manaus, AM (Brazil); Freitas, Jaluza G.M.R. de; Teixeira, Ivan J.L. [Concremat Engenharia e Tecnologia, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work brings together the difficulties and results generated in response to Brazilian Environmental Law applicable to a work of pipelines in the Amazon. We are a country that has the most extensive and rich environmental legislation in the world, and Engineering at PETROBRAS, through the Implementation of Enterprise for the North, responsible for the deployment of this pipeline, has ISO 14001:2004 certification, taking as the minimum requirement attending the applicable legal requirements, and serve them in if there are difficulties elsewhere in the country, here in the Amazon it is increased meet the logistical difficulties, the distances from major centres, the needs of technology, information and access to basic resources. This article discusses topics such as: transport of hazardous waste in an environmentally safe way in one of the largest rivers in the world, installing devices sewage treatment in regional boats, and teach the riparian preserve the historic and archaeological findings, these are just examples found. We know that all eyes of the world is impressive return to the Amazon rain forest, and that cross, or rather 'rip' their 383 km of primary forest, virgin land, almost untouched even by the people native of the region, in itself constitutes a great challenge. (author)

  18. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  19. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  20. Pipeline Drag Reducers

    International Nuclear Information System (INIS)

    Marawan, H.

    2004-01-01

    Pipeline drag reducers have proven to be an extremely powerful tool in fluid transportation. High molecular weight polymers are used to reduce the frictional pressure loss ratio in crude oil pipelines, refined fuel and aqueous pipelines. Chemical structure of the main used pipeline drag reducers is one of the following polymers and copolymers classified according to the type of fluid to ; low density polyethylene, copolymer of I-hexane cross linked with divinyl benzene, polyacrylamide, polyalkylene oxide polymers and their copolymers, fluorocarbons, polyalkyl methacrylates and terpolymer of styrene, alkyl acrylate and acrylic acid. Drag reduction is the increase in pump ability of a fluid caused by the addition of small amounts of an additive to the fluid. The effectiveness of a drag reducer is normally expressed in terms of percent drag reduction. Frictional pressure loss in a pipeline system is a waste of energy and it costly. The drag reducing additive minimizes the flow turbulence, increases throughput and reduces the energy costs. The Flow can be increased by more than 80 % with existing assets. The effectiveness of the injected drag reducer in Mostorod to Tanta crude oil pipeline achieved 35.4 % drag reduction and 23.2 % flow increase of the actual performance The experimental application of DRA on Arab Petroleum Pipeline Company (Summed) achieved a flow increase ranging from 9-32 %

  1. Pollution from pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    During the 1980s, over 3,900 spills from land-based pipelines released nearly 20 million gallons of oil into U.S. waters-almost twice as much as was released by the March 1989 Exxon Valdez oil spill. Although the Department of Transportation is responsible for preventing water pollution from petroleum pipelines, GAO found that it has not established a program to prevent such pollution. DOT has instead delegated this responsibility to the Coast Guard, which has a program to stop water pollution from ships, but not from pipelines. This paper reports that, in the absence of any federal program to prevent water pollution from pipelines, both the Coast Guard and the Environmental Protection Agency have taken steps to plan for and respond to oil spills, including those from pipelines, as required by the Clean Water Act. The Coast Guard cannot, however, adequately plan for or ensure a timely response to pipeline spills because it generally is unaware of specific locations and operators of pipelines

  2. Have Disability Transfers Caused the Decline in Older Male Labor Force Participation? A Work-Status Rational Choice Model.

    Science.gov (United States)

    Haveman, Robert H.; Wolfe, Barbara L.

    This paper presents a decision-process model for explaining the growth in transfer recipiency (the receipt by working age people of disability income), the choice of work status, and the reduction in labor force participation of older workers. It is hypothesized that the attractiveness of disability income transfer options has led older male…

  3. High temperature pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Greenslade, J.G. [Colt Engineering, Calgary, AB (Canada). Pipelines Dept.; Nixon, J.F. [Nixon Geotech Ltd., Calgary, AB (Canada); Dyck, D.W. [Stress Tech Engineering Inc., Calgary, AB (Canada)

    2004-07-01

    It is impractical to transport bitumen and heavy oil by pipelines at ambient temperature unless diluents are added to reduce the viscosity. A diluted bitumen pipeline is commonly referred to as a dilbit pipeline. The diluent routinely used is natural gas condensate. Since natural gas condensate is limited in supply, it must be recovered and reused at high cost. This paper presented an alternative to the use of diluent to reduce the viscosity of heavy oil or bitumen. The following two basic design issues for a hot bitumen (hotbit) pipeline were presented: (1) modelling the restart problem, and, (2) establishing the maximum practical operating temperature. The transient behaviour during restart of a high temperature pipeline carrying viscous fluids was modelled using the concept of flow capacity. Although the design conditions were hypothetical, they could be encountered in the Athabasca oilsands. It was shown that environmental disturbances occur when the fluid is cooled during shut down because the ground temperature near the pipeline rises. This can change growing conditions, even near deeply buried insulated pipelines. Axial thermal loads also constrain the design and operation of a buried pipeline as higher operating temperatures are considered. As such, strain based design provides the opportunity to design for higher operating temperature than allowable stress based design methods. Expansion loops can partially relieve the thermal stress at a given temperature. As the design temperature increase, there is a point at which above grade pipelines become attractive options, although the materials and welding procedures must be suitable for low temperature service. 3 refs., 1 tab., 10 figs.

  4. Trouble in the pipeline?

    Energy Technology Data Exchange (ETDEWEB)

    Snieckus, Darius

    2002-10-01

    The author provides a commentary on the political, economic, environmental and social problems facing the proposed 3 billion US dollars Baku-Ceyhan-Tbilisi export pipeline. The 1760 km long pipeline has been designed to carry 1 million b/d of crude oil from the Caspian Sea to Turkey's Mediterranean coast. The pipeline is being constructed by a BP-led consortium made up of Socar, Statoil, Unocal, TPAO, Eni, Itochu, Amerada Hess, TotalFinaElf and BP. (UK)

  5. Trends in the Danish work environment in 1990-2000 and their associations with labor-force changes.

    Science.gov (United States)

    Burr, Hermann; Bjorner, Jakob B; Kristensen, Tage S; Tüchsen, Finn; Bach, Elsa

    2003-08-01

    The aims of this study were (i) to describe the trends in the work environment in 1990-2000 among employees in Denmark and (ii) to establish whether these trends were attributable to labor-force changes. The split-panel design of the Danish Work Environment Cohort Study includes interviews with three cross-sections of 6067, 5454, and 5404 employees aged 18-59 years, each representative of the total Danish labor force in 1990, 1995 and 2000. In the cross-sections, the participation rate decreased over the period (90% in 1990, 80% in 1995, 76% in 2000). The relative differences in participation due to gender, age, and region did not change noticeably. Jobs with decreasing prevalence were clerks, cleaners, textile workers, and military personnel. Jobs with increasing prevalence were academics, computer professionals, and managers. Intense computer use, long workhours, and noise exposure increased. Job insecurity, part-time work, kneeling work posture, low job control, and skin contact with cleaning agents decreased. Labor-force changes fully explained the decline in low job control and skin contact to cleaning agents and half of the increase in long workhours, but not the other work environment changes. The work environment of Danish employees improved from 1990 to 2000, except for increases in long workhours and noise exposure. From a specific work environment intervention point of view, the development has been less encouraging because declines in low job control, as well as skin contact to cleaning agents, were explained by labor-force changes.

  6. Pipeline developments 1998 and beyond : more choices, more difficult decisions

    International Nuclear Information System (INIS)

    VanderSchee, K.

    1998-01-01

    Some of the basic economic principles that drive gas prices and gas flows across North America, and the pressures these have placed on the pipeline sector, are reviewed. Of pressing importance to the natural gas industry in Western Canada is the prospect that in the near future industrial gas users in eastern Canada will have a wider array of pipeline choices available to them than ever before. This will mean that the users will face more offerings from more pipeline providers, forcing pipeline owners to make more difficult decisions regarding new pipeline capacity. Variables such as price, terms and conditions will become increasingly negotiable. Market power concerns also remain an important issue. As a result, there is increasing call for market-based financial regulation of pipelines. 'Market gaming' a condition where a firm manipulates the market to its own market advantage is also receiving considerable attention. The latter is of particular concern in the United States. Against this background, the nature of competition (or the lack of it) in natural gas transport, the influence of short-term service revenues for pipelines, pipeline commitments through subsidiaries, and concerns over short term pipeline valuations skewing investment decisions, are issues that will continue to invite much attention. Regarding market outlook, it was noted that significantly increased export capacity from Alberta could raise the costs of Alberta supplies to eastern Canadian end-users relative to other supply/transport options which may now be viable economic alternatives. figs

  7. Pipeline developments 1998 and beyond : more choices, more difficult decisions

    Energy Technology Data Exchange (ETDEWEB)

    VanderSchee, K. [EnergyERA (Canada)

    1998-12-31

    Some of the basic economic principles that drive gas prices and gas flows across North America, and the pressures these have placed on the pipeline sector, are reviewed. Of pressing importance to the natural gas industry in Western Canada is the prospect that in the near future industrial gas users in eastern Canada will have a wider array of pipeline choices available to them than ever before. This will mean that the users will face more offerings from more pipeline providers, forcing pipeline owners to make more difficult decisions regarding new pipeline capacity. Variables such as price, terms and conditions will become increasingly negotiable. Market power concerns also remain an important issue. As a result, there is increasing call for market-based financial regulation of pipelines. `Market gaming` a condition where a firm manipulates the market to its own market advantage is also receiving considerable attention. The latter is of particular concern in the United States. Against this background, the nature of competition (or the lack of it) in natural gas transport, the influence of short-term service revenues for pipelines, pipeline commitments through subsidiaries, and concerns over short term pipeline valuations skewing investment decisions, are issues that will continue to invite much attention. Regarding market outlook, it was noted that significantly increased export capacity from Alberta could raise the costs of Alberta supplies to eastern Canadian end-users relative to other supply/transport options which may now be viable economic alternatives. figs.

  8. Arthritis-related work transitions: a prospective analysis of reported productivity losses, work changes, and leaving the labor force.

    Science.gov (United States)

    Gignac, Monique A M; Cao, Xingshan; Lacaille, Diane; Anis, Aslam H; Badley, Elizabeth M

    2008-12-15

    To prospectively examine arthritis-related productivity losses, work changes, and leaving employment, the relationships among these work transitions, and the factors associated with them. Participants with inflammatory arthritis or osteoarthritis were interviewed at 4 time points, 18 months apart, using a structured questionnaire. At baseline (T1), all participants (n = 490; 381 women, 109 men) were employed. At T2, T3, and T4, the sample decreased to 413, 372, and 349 participants, respectively. Respondents were recruited using community advertising and from rheumatology and rehabilitation clinics. Work transitions considered were productivity losses (absenteeism, job disruptions), work changes (reduced hours, changing jobs), and leaving employment. Also measured were demographic, illness, work context, and psychological variables. Generalized estimation equations modeled predictors of work transitions over time. Although 63.1% of respondents remained employed throughout the study, work transitions were common (reported by 76.5% of participants). Productivity losses, especially job disruptions such as being unable to take on extra work, were the most frequently reported. Work transitions were related to subsequently making other work transitions, including leaving employment. Age, sex, education, activity limitations, control, depression, and arthritis-work spillover were also associated with work transitions. This study sheds light on a process of diverse employment changes that may occur in the lives of many individuals with arthritis. It emphasizes the interrelationships among work transitions, as well as other factors in predicting work transitions, and it provides insight into work changes that may signal impending difficulties with remaining employed.

  9. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  10. National Pipeline Mapping System

    Data.gov (United States)

    Department of Transportation — The NPMS Public Map Viewer allows the general public to view maps of transmission pipelines, LNG plants, and breakout tanks in one selected county. Distribution and...

  11. Jeopardy not bonus status for African American women in the work force: why does the myth of advantage persist?

    Science.gov (United States)

    Sanchez-Hucles, J V

    1997-10-01

    African American women in the United States have a long history of employment outside of their homes. Their experiences are unique from other groups of majority and minority men and women due to the interaction of race, gender, and class. Despite long-standing and continuing struggles against discrimination, harassment, low pay, tokenism, and stereotypes, a myth that African American women enjoy a bonus or advantaged status in the work force has developed and persisted. In this article, Black women's work force experiences are examined from a social constructionist framework, misperceptions of Black women are critiqued, explanations are developed that explain the unique status of African American women and recommendations are proposed to eradicate the discrimination and marginal status that Black women have endured in the work force.

  12. Seismic vulnerability of natural gas pipelines

    International Nuclear Information System (INIS)

    Lanzano, Giovanni; Salzano, Ernesto; Santucci de Magistris, Filippo; Fabbrocino, Giovanni

    2013-01-01

    This work deals with the analysis of the interaction of earthquakes with pipelines transporting and distributing natural gas for industrial and civil use. To this aim, a new large data-set of seismic information classified on the basis of selected seismological, geotechnical and structural parameters is presented and analyzed. Particular attention is devoted to continuous pipelines under strong ground shaking, which is the geotechnical effect due to passage of waves in soil. Results are provided in terms of the likelihood of the loss of containment with respect to Peak Ground Velocity (PGV), a seismic intensity parameter which may be easily retrieved either from local authorities and public databases or from site dependent hazard analysis. Fragility functions and seismic intensity threshold values for the failure and for the loss of containment of gas from pipeline systems are also given. The obtained functions can be easily implemented in existing codes and guidelines for industrial risk assessment, land-use planning, and for the design of public distribution network, with specific reference to Natural—Technological interaction (Na-Tech). -- Highlights: • The seismic vulnerability of natural gas pipelines is analyzed. • A collection of data for pipelines damaged by earthquake is given. • Damage states and risk states for pipelines are defined. • Consequence-based fragility formulations for the loss of containment are given • Seismic threshold values for public authority, risk assessment and gas distribution are shown

  13. Pipelines in power plants

    International Nuclear Information System (INIS)

    Oude-Hengel, H.H.

    1978-01-01

    Since the end of the Sixties, steam-transporting pipelines are given great attention, as pipeline components often fail, partially even long before their designed operation time is over. Thus, experts must increasingly deal with questions of pipelines and their components. Design and calculation, production and operation of pipelines are included in the discussion. Within the frame of this discussion, planners, producers, operators, and technical surveillance personnel must be able to offer a homogenous 'plan for assuring the quality of pipelines' in fossil and nuclear power plants. This book tries to make a contribution to this topic. 'Quality assuring' means efforts made for meeting the demands of quality (reliability). The book does not intend to complete with well-known manuals, as for as a complete covering of the topic is concerned. A substantial part of its sections serves to show how quality assurance of pipelines can be at least partially obtained by surveillance measures beginning with the planning, covering the production, and finally accompanying the operation. There is hardly need to mention that the sort of planning, production, and operation has an important influence on the quality. This is why another part of the sections contain process aspects from the view of the planners, producers, and operators. (orig.) [de

  14. Pipelines to eastern Canada

    International Nuclear Information System (INIS)

    Otsason, J.

    1998-01-01

    This presentation focused on four main topics: (1) the existing path of pipelines to eastern Canada, (2) the Chicago hub, (3) transport alternatives, and (4) the Vector Pipeline' expansion plans. In the eastern Canadian market, TransCanada Pipelines dominates 96 per cent of the market share and is effectively immune to expansion costs. Issues regarding the attractiveness of the Chicago hub were addressed. One attractive feature is that the Chicago hub has access to multiple supply basins including western Canada, the Gulf Coast, the mid-continent, and the Rockies. Regarding Vector Pipelines' future plans, the company proposes to construct 343 miles of pipeline from Joliet, Illinois to Dawn, Ontario. Project description included discussion of some of the perceived advantages of this route, namely, extensive storage in Michigan and south-western Ontario, the fact that the proposed pipeline traverses major markets which would mitigate excess capacity concerns, arbitrage opportunities, cost effective expansion capability reducing tolls, and likely lower landed costs in Ontario. Project schedule, costs, rates and tariffs are also discussed. tabs., figs

  15. Transient leak detection in crude oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Beushausen, R.; Tornow, S.; Borchers, H. [Nord-West Oelleitung, Wilhelmshaven (Germany); Murphy, K.; Zhang, J. [Atmos International Ltd., Manchester (United Kingdom)

    2004-07-01

    Nord-West Oelleitung (NWO) operates 2 crude oil pipelines from Wilhemshaven to Koln and Hamburg respectively. German regulations for transporting flammable substances stipulate that 2 independent continuously working procedures be used to detect leaks. Leak detection pigs are used routinely to complement the surveillance system. This paper described the specific issues of transient leak detection in crude oil pipelines. It was noted that traditional methods have failed to detect leaks that occur immediately after pumps are turned on or off because the pressure wave generated by the transient dominates the pressure wave that results from the leak. Frequent operational changes in a pipeline are often accompanied by an increased number of false alarms and failure to detect leaks due to unsteady operations. NWO therefore decided to have the Atmos statistical pipeline leak detection (SPLD) system installed on their pipelines. The key to the SPLD system is the sequential probability ratio test. Comprehensive data validation is performed following reception of pipeline data from the supervisory control and data acquisition (SCADA) system. The validated data is then used to calculate the corrected flow imbalance, which is fed into the SPRT to determine if there is an increase in the flow imbalance. Pattern recognition is then used to distinguish a leak from operational changes. The SPLD is unique because it uses 3 computational pipeline monitoring methods simultaneously, namely modified volume balance, statistical analysis, and pressure and flow monitoring. The successful installation and testing of the SPLD in 2 crude oil pipelines was described along with the main difficulties associated with transient leaks. Field results were presented for both steady-state and transient conditions. 5 refs., 2 tabs., 16 figs.

  16. Interagency task force on the health effects of ionizing radiation: report of the work group on public information

    International Nuclear Information System (INIS)

    1979-06-01

    The health effects of ionizing radiation recently have been the focus of increased public concern. In response to this concern, in a May 9, 1978, memorandum the White House requested the Secretary of Health, Education, and Welfare to coordinate an interagency program that would, among other things, ensure public awareness and knowledge of the health effects of ionizing radiation. As a result, the Interagency Task Force on Ionizing Radiation was formed. The Information Work Group of the Task Force was asked to outline a public information program to meet the needs of the general public, the health and scientific community, workers, and other persons exposed to low levels of ionizing radiation in the past and at present or who may be exposed in the future. The Work Group is composed of 16 members, each representing an agency participating on the Interagency Task Force on Ionizing Radiation. The Work Group members used the draft Reports of the Science Work Group, the Radiation Exposure Reduction Work Group, the Care and Benefits Work Group, and the Privacy Work Group as a basis for developing the Information Report. In addition, the Information Work Group conducted a preliminary review of existing federal information programs. Meetings were held with representatives of environmental and trade groups, unions, and professional societies to help define the dimensions and priorities of a public information program

  17. 49 CFR 193.2067 - Wind forces.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... confining, structure; and (3) In the case of impounding systems for LNG storage tanks, impact forces and...

  18. “Do the Germans Really Work Six Weeks More than the French?” – Measuring Working Time with the Labour Force Survey in France and Germany

    Directory of Open Access Journals (Sweden)

    Körner Thomas

    2016-06-01

    Full Text Available Measuring working time is not only an important objective of the EU Labour Force Survey (LFS, but also a highly demanding task in terms of methodology. Against the background of a recent debate on the comparability of working time estimates in France and Germany, this article presents a comparative assessment of the measurement of working time in the Labour Force Survey obtained in both countries. It focuses on the measurement of the hours actually worked, the key working-time concept for short-term economic analysis and the National Accounts. The contribution systematically analyses the differences in the measurement approaches used in France and Germany in order to identify the methodological effects that hinder comparability. It comes to the conclusion that the LFS overstates the difference in hours actually worked in France and Germany and identifies question comprehension, rounding, editing effects, as well as certain aspects of the sampling design, as crucial factors of a reliable measurement in particular of absences from work during the reference week. We recommend continuing the work started in the European Statistical System towards the development of a model questionnaire in order to improve cross-national harmonisation of key variables such as hours actually worked.

  19. Force, Velocity, and Work: The Effects of Different Contexts on Students' Understanding of Vector Concepts Using Isomorphic Problems

    Science.gov (United States)

    Barniol, Pablo; Zavala, Genaro

    2014-01-01

    In this article we compare students' understanding of vector concepts in problems with no physical context, and with three mechanics contexts: force, velocity, and work. Based on our "Test of Understanding of Vectors," a multiple-choice test presented elsewhere, we designed two isomorphic shorter versions of 12 items each: a test with no…

  20. Impacts on the physical environment caused by works of the OSBAT 24'' Oil Pipeline; Impactos no meio fisico decorrentes das obras de manutencao do Oleoduto OSBAT 24''

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, Celia Maria; Oliveira, Flavio Martiniano de; Kagawa, Adriana; Serra, Ricardo Novaes; Perim, Leandro Amadeu; Endo, Andressa [LENC - Laboratorio de Engenharia e Consultoria Ltda., Cotia, SP (Brazil)

    2008-07-01

    In this article it presents considerations about the essentials transformations and environmental impacts in the physical environment, result of the work of maintenance of OSBAT 24'' Pipeline, located in a stretch from the Sao Sebastiao city (center) and Camburi's district, in Sao Paulo State. The essentials processes, conditions, discernments tools used to classify for its, the actions technology had changed theses processes, the environmental impacts significant, the measures has accepting to control of these processes and environmental impacts. The general sense of article is to reveal about the experience obtained, seeking to broadcast the justifications, features concepts and methods that are responsible for the success reached, as well as, to point out obstacles found and recommendations to guest a quality environmental. (author)

  1. LNG transport through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pfund, P; Philipps, A

    1975-01-01

    LNG pipelines could help solve some peakshaving problems if operated in conjunction with other facilities that could use the LNG cold recovered during regasification. In some areas at present, LNG is delivered by tanker and regasified near the terminal for transmission through conventional gas pipelines. In other places, utilities liquefy natural gas for easy storage for later peakshaving use. The only chance to avoid the second expensive liquefaction step would be to convey imported LNG through a suitable designed LNG pipeline. The technical problems involved in LNG pipeline construction have basically been solved in recent years, but those pipelines actually constructed have been only short ones. To be economically justified, long-distance LNG lines require additional credit, which could be obtained by selling the LNG cold recovered during regasification to industrial users located in or near the points of gas consumption. Technical details presented cover the pipe material, stress relief, steel composition, pressure enthalpy, bellows-type expansion joints, and mechanical and thermal insulation.

  2. Water level detection pipeline

    International Nuclear Information System (INIS)

    Koshikawa, Yukinobu; Imanishi, Masatoshi; Niizato, Masaru; Takagi, Masahiro

    1998-01-01

    In the present invention, water levels of a feedwater heater and a drain tank in a nuclear power plant are detected at high accuracy. Detection pipeline headers connected to the upper and lower portions of a feedwater heater or a drain tank are connected with each other. The connection line is branched at appropriate two positions and an upper detection pipeline and a lower detection pipeline are connected thereto, and a gauge entrance valve is disposed to each of the detection pipelines. A diaphragm of a pressure difference generator is connected to a flange formed to the end portion. When detecting the change of water level in the feedwater heater or the drain tank as a change of pressure difference, gauge entrance valves on the exit side of the upper and lower detection pipelines are connected by a connection pipe. The gauge entrance valve is closed, a tube is connected to the lower detection pipe to inject water to the diaphragm of the pressure difference generator passing through the connection pipe thereby enabling to calibrate the pressure difference generator. The accuracy of the calibration of instruments is improved and workability thereof upon flange maintenance is also improved. (I.S.)

  3. Pipeline river crossing studies; Estudos de travessias de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Leal, Marcos de Castro; Stasiak, Luciano; Silva, Alessandra de Barros e [ESTEIO Engenharia e Aerolevantamentos S.A., Curitiba, PR (Brazil)

    2005-07-01

    This work has for objective to guide the execution of study of pipelines crossings under courses of water, channels, flooded areas and reservoirs. The study seeks the minimal risks to the pipelines, be them anthropics, geotechnics, hydraulics or environmental, as in the implantation phase as of operation. It also seeks to determine which is the best constructive method for the crossing in question. (author)

  4. Gender Equality in the Academy: The Pipeline Problem

    Science.gov (United States)

    Monroe, Kristen Renwick; Chiu, William F.

    2010-01-01

    As part of the ongoing work by the Committee on the Status of Women in the Profession (CSWP), we offer an empirical analysis of the pipeline problem in academia. The image of a pipeline is a commonly advanced explanation for persistent discrimination that suggests that gender inequality will decline once there are sufficient numbers of qualified…

  5. Pipelines. Economy's veins; Pipelines. Adern der Wirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Feizlmayr, Adolf; Goestl, Stefan [ILF Beratende Ingenieure, Muenchen (Germany)

    2011-02-15

    According to the existing prognoses more than 1 million km of gas pipelines, oil pipelines and water pipelines are built up to the year 2030. The predominant portion is from gas pipelines. The safe continued utilization of the aging pipelines is a large challenge. In addition, the diagnostic technology, the evaluation and risk assessment have to be developed further. With the design of new oil pipelines and gas pipelines, aspects of environmental protection, the energy efficiency of transport and thus the emission reduction of carbon dioxide, the public acceptance and the market strategy of the exporters gain in importance. With the offshore pipelines one soon will exceed the present border of 2,000 m depth of water and penetrate into larger sea depths.

  6. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Science.gov (United States)

    2012-06-08

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0100] Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines AGENCY: Office of Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION...

  7. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under...

  8. Pipeline rehabilitation planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil; Eyre, David [PENSPEN (United Kingdom)

    2005-07-01

    An operator faced with an onshore pipeline that has extensive damage must consider the need for rehabilitation, the sort of rehabilitation to be used, and the rehabilitation schedule. This paper will consider pipeline rehabilitation based on the authors' experiences from recent projects, and recommend a simple strategy for planning pipeline rehabilitation. It will also consider rehabilitation options: external re-coating; internal lining; internal painting; programmed repairs. The main focus will be external re-coating. Consideration will be given to rehabilitation coating types, including tape wraps, epoxy, and polyurethane. Finally it will discuss different options for scheduling the rehabilitation of corrosion damage including: the statistical comparison of signals from inspection pigs; statistical comparison of selected measurements from inspection pigs and other inspections; the use of corrosion rates estimated for the mechanisms and conditions; expert judgement. (author)

  9. CPL: Common Pipeline Library

    Science.gov (United States)

    ESO CPL Development Team

    2014-02-01

    The Common Pipeline Library (CPL) is a set of ISO-C libraries that provide a comprehensive, efficient and robust software toolkit to create automated astronomical data reduction pipelines. Though initially developed as a standardized way to build VLT instrument pipelines, the CPL may be more generally applied to any similar application. The code also provides a variety of general purpose image- and signal-processing functions, making it an excellent framework for the creation of more generic data handling packages. The CPL handles low-level data types (images, tables, matrices, strings, property lists, etc.) and medium-level data access methods (a simple data abstraction layer for FITS files). It also provides table organization and manipulation, keyword/value handling and management, and support for dynamic loading of recipe modules using programs such as EsoRex (ascl:1504.003).

  10. Work demands, job insecurity and sickness absence from work. how productive is the new, flexible labour force?

    Science.gov (United States)

    D'Souza, Rennie M; Strazdins, Lyndall; Broom, Dorothy H; Rodgers, Bryan; Berry, Helen L

    2006-06-01

    We investigate one aspect of productivity--sickness absence--and ask whether job insecurity and high work demands are associated with increased sickness absence and, if so, whether mental or physical health mediates this association. We further investigate if having control at work modifies these associations. We used cross-sectional survey data from 2,248 employees aged 40-44 years living in two cities of south-eastern Australia. Logistic regressions were used to compare the associations between job insecurity and demands among those with short (1-3 days) or long-term (> 3 days) sickness absence with those who had no sickness absence in the last four weeks. The mediating effects of mental and physical health were assessed by evaluating changes in the magnitude of the association between these work conditions and sickness absence. High job insecurity (OR = 3.28; 95% CI 1.54-6.95) and high work demands (OR = 1.62; 95% CI 1.13-2.30) were significantly associated with long-term, but not with short-term, sickness absence. These associations were unaffected by job control. Depression and anxiety explained 61% of the association between high work demands and long-term sickness absence and 30% of the association between job insecurity and long-term sickness absence. Difficult working conditions may reduce productivity by contributing to longer absences from work. Reforms intended to improve economic performance should address any potential health costs of insecurity or intensification, which could inadvertently decrease productivity, possibly through their impact on mental health.

  11. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  12. WORKING AND CARING: THE SIMULTANEOUS DECISION OF LABOR FORCE PARTICIPATION AND INFORMAL ELDERLY AND CHILD SUPPORT ACT IVITIES IN MEXICO*

    Science.gov (United States)

    van Gameren, Edwin; Velandia Naranjo, Durfari

    2016-01-01

    We analyze factors determining women’s decisions to participate in the labor market and provide elderly care and nonfinancial support to their (grand)children. We use data from the Mexican Health and Aging Study, a survey of people aged 50 and over, applying a three-equation, reduced-form SUR model. Results suggest that care needs are the driving force behind caregiving activities. Traditional roles also appear to be relevant in the labor force participation decision: women with a closer labor market connection when they were young are more likely to work. Simulations of demographic changes illustrate potential effects for future caregiving and participation rates. PMID:26924883

  13. Establishing Criteria for Assigning Personnel to Air Force Jobs Requiring Heavy Work

    Science.gov (United States)

    1978-07-01

    loads (for example, carrying meat at the slaughterhouse , carrying of sacks, loading wood by hand) wood cutting in the forest by hand tools, agricultural...8217 factor history. Medical Service Digest (United States Air Force), 27(2), 1976, pp. 14-16. 186 Trimeloni, Col. B.D. The Role of Women in the Air Force...Rahden. Effect of training on maximum oxygen intake and on anaerobic metabolism in man. Int. Z. Angew Physiol., 24(2), 1967, pp. 102-110. 188 Wyndham, C.H

  14. Local work function analysis of Pt/TiO2 photocatalyst by a Kelvin probe force microscope

    International Nuclear Information System (INIS)

    Hiehata, K; Sasahara, A; Onishi, H

    2007-01-01

    Nanometre-sized Pt clusters were prepared on a TiO 2 (110)-(1 x 1) surface, and the lateral distribution of work function was examined by using a Kelvin probe force microscope. Local work function on the Pt clusters was smaller than that on the surrounding TiO 2 surface. Assuming that the dipole moments which perturb the work function are produced by uneven electron distribution, the decrease of the work function indicates electron transfer from the clusters to the TiO 2 surface. After decomposition of pivalate anions on the surfaces by UV irradiation, the work function increased on some Pt clusters. It is known that holes photoexcited in TiO 2 attach to pivalate anions to cause a decomposition reaction. Hence the increase of the observed work function by UV irradiation can be ascribed to the trapping of the accompanying electrons to the Pt clusters

  15. Wives' Relative Wages, Husbands' Paid Work Hours, and Wives' Labor-Force Exit

    Science.gov (United States)

    Shafer, Emily Fitzgibbons

    2011-01-01

    Economic theories predict that women are more likely to exit the labor force if their partners' earnings are higher and if their own wage rate is lower. In this article, I use the National Longitudinal Survey of Youth (N = 2,254) and discrete-time event-history analysis to show that wives' relative wages are more predictive of their exit than are…

  16. Labor Force Participation Rates among Working-Age Individuals with Visual Impairments

    Science.gov (United States)

    Kelly, Stacy M.

    2013-01-01

    The present study analyzes four consecutive years of monthly labor force participation rates reported by the Current Population Survey that included nationally representative samples of the general U.S. population and nationally representative samples of the U.S. population with specifically identified disabilities. Visual impairment is one of the…

  17. Working women worldwide. Age effects in female labor force participation in 117 countries

    NARCIS (Netherlands)

    Besamusca, J.; Tijdens, K.; Keune, M.; Steinmetz, S.

    2015-01-01

    In this article, we investigate the effects of economic conditions, families, education, and gender ideologies on the labor force participation rates of women in eleven age groups in 117 countries. We find that participation rates of young and older women are partly explained by sector sizes and the

  18. Analysis of long- and short-range contribution to adhesion work in cardiac fibroblasts: An atomic force microscopy study

    Energy Technology Data Exchange (ETDEWEB)

    Sbaizero, O., E-mail: sbaizero@units.it [Department of Engineering and Architecture, University of Trieste (Italy); University of Colorado Cardiovascular Institute, University of Colorado Denver, Aurora (United States); DelFavero, G. [Department of Engineering and Architecture, University of Trieste (Italy); Martinelli, V. [International Center for Genetic Engineering and Biotechnology, Trieste (Italy); Long, C.S.; Mestroni, L. [University of Colorado Cardiovascular Institute, University of Colorado Denver, Aurora (United States)

    2015-04-01

    Atomic force microscopy (AFM) for single-cell force spectroscopy (SCFS) and Poisson statistic were used to analyze the detachment work recorded during the removal of gold-covered microspheres from cardiac fibroblasts. The effect of Cytochalasin D, a disruptor of the actin cytoskeleton, on cell adhesion was also tested. The adhesion work was assessed using a Poisson analysis also derived from single-cell force spectroscopy retracting curves. The use of Poisson analysis to get adhesion work from AFM curves is quite a novel method, and in this case, proved to be effective to study the short-range and long-range contributions to the adhesion work. This method avoids the difficult identification of minor peaks in the AFM retracting curves by creating what can be considered an average adhesion work. Even though the effect of actin depolymerisation is well documented, its use revealed that control cardiac fibroblasts (CT) exhibit a work of adhesion at least 5 times higher than that of the Cytochalasin treated cells. However, our results indicate that in both cells short-range and long-range contributions to the adhesion work are nearly equal and the same heterogeneity index describes both cells. Therefore, we infer that the different adhesion behaviors might be explained by the presence of fewer membrane adhesion molecules available at the AFM tip–cell interface under circumstances where the actin cytoskeleton has been disrupted. - Highlights: • AFM force–deformation curve was used to characterize the cardiac fibroblast adhesion behavior. • The amount and nature of adhesion were assessed using a Poisson analysis applied to the AFM curve. • The work of adhesion for control cells was about four times higher than that of the Cyt-D treated cells. • Short- and long-range contributions to adhesion are nearly equal for both control and treated cells.

  19. Hazard identification studies applied to oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Savio, Augusto; Alpert, Melina L. [TECNA S.A., Buenos Aires (Argentina)], e-mail: asavio@tecna.com, e-mail: malpert@tecna.com

    2008-07-01

    In order to assess risks inherent to an Oil Pipeline, it is imperative to analyze what happens 'outside the process'. HAZID (HAZard IDentification) studies are mainly carried out for this purpose. HAZID is a formal study which identifies hazards and risks associated to an operation or facility and enable its acceptability assessment. It is a brainstorming exercise guided by a typical 'Checklist', divided into four Sections: External, Facilities and Health Hazards and Issues pertaining to Project Execution, which are further subdivided into Hazard Categories. For each Category, there are 'Guide-words' and 'Prompts'. Even if an Oil Pipeline Risk Assessment can be performed by means of the above referred 'Checklist', carrying out the actual process can become lengthy and annoying due to the lack of specificity. This work aims at presenting the most suitable 'Checklist' for the identification of Oil Pipeline Risk Assessment, although it could be used for Gas Pipeline Risk Assessment too. Prepared ad hoc, this list, is based on the spill causes established by CONCAWE (CONservation of Clean Air Water in Europe). Performing Oil Pipeline Risk Assessment by means of specially formulated Checklist enables the Study Team to easily identify risks, shortens execution time and provides both accuracy and specificity. (author)

  20. Pipesworld : applying planning systems to pipeline transportation

    Energy Technology Data Exchange (ETDEWEB)

    Milidiu, R.L.; Santos Liporace, F. [Pontificia Univ. Catolica, Rio de Janeiro (Brazil). Dept. de Informatica

    2004-07-01

    This paper explored issues facing the complex task of managing pipelines that transport large volumes of petroleum products over long distances. Since oil pipelines are generally a few inches wide and several miles long, reasonable amounts of distinct products can be transported with very small loss due to the mixing at liquid boundaries. Optimizing the transportation through oil pipelines in terms of maintenance and environmental safety is a high priority for pipeline operators. This paper presented the Pipesworld model which takes into account features such as product interface constraints, limited product storage capacities and due dates for product delivery. It has been benchmarked as a start-of-art general purpose artificial planning system. This paper also reported the results derived by general purpose artificial intelligence planning systems when applied to the Pipesworld model. It demonstrated how various modelling techniques can be used to enhance the planners performance. Current work in developing Plumber was also presented. This dedicated solver that addresses operational situations uses both general purpose planning techniques as well as domain specific knowledge. When Plumber was incorporated into Pipesworld, its outperformed Fast-Forward, one of the best available general purpose planning systems, suggesting that improved versions of Plumber have the potential to deal with various problem scenarios in pipeline operations. 11 refs., 2 tabs., 3 figs.

  1. Implementing an X-ray validation pipeline for the Protein Data Bank.

    Science.gov (United States)

    Gore, Swanand; Velankar, Sameer; Kleywegt, Gerard J

    2012-04-01

    There is an increasing realisation that the quality of the biomacromolecular structures deposited in the Protein Data Bank (PDB) archive needs to be assessed critically using established and powerful validation methods. The Worldwide Protein Data Bank (wwPDB) organization has convened several Validation Task Forces (VTFs) to advise on the methods and standards that should be used to validate all of the entries already in the PDB as well as all structures that will be deposited in the future. The recommendations of the X-ray VTF are currently being implemented in a software pipeline. Here, ongoing work on this pipeline is briefly described as well as ways in which validation-related information could be presented to users of structural data.

  2. Diagnosing in building main pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Telegin, L.G.; Gorelov, A.S.; Kurepin, B.N.; Orekhov, V.I.; Vasil' yev, G.G.; Yakovlev, Ye. I.

    1984-01-01

    General principles are examined for technical diagnosis in building main pipelines. A technique is presented for diagnosis during construction, as well as diagnosis of the technical state of the pipeline-construction machines and mechanisms. The survey materials could be used to set up construction of main pipelines.

  3. Richards Bay effluent pipeline

    CSIR Research Space (South Africa)

    Lord, DA

    1986-07-01

    Full Text Available of major concern identified in the effluent are the large volume of byproduct calcium sulphate (phosphogypsum) which would smother marine life, high concentrations of fluoride highly toxic to marine life, heavy metals, chlorinated organic material... ........................ 9 THE RICHARDS BAY PIPELINE ........................................ 16 Environmental considerations ................................... 16 - Phosphogypsum disposal ................................... 16 - Effects of fluoride on locally occurring...

  4. Central oxygen pipeline failure

    African Journals Online (AJOL)

    surgical intensive care unit (ICU), with two patients on full ventilation and ... uncertainty around the cause of the failure and the restoration, .... soon as its level also falls below three tons. Should ... (properly checked and closed prior to each anaesthetic). ... in use at the time of the central oxygen pipeline failure at Tygerberg.

  5. Characteristics of operating pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gallyamov, A K; Armenskii, E A; Gimaev, R G; Mastobaev, B N; Shammazov, A M

    1977-04-01

    The interval in pressure changes according to operational data for the Kamennyi Log--Perm oil pipeline was determined with the aid of the pattern identification method. This has made it possible to determine pressure changes in the operational process. 2 references, 1 table.

  6. Transient cavitation in pipelines

    NARCIS (Netherlands)

    Kranenburg, C.

    1974-01-01

    The aim of the present study is to set up a one-dimensional mathematical model, which describes the transient flow in pipelines, taking into account the influence of cavitation and free gas. The flow will be conceived of as a three-phase flow of the liquid, its vapour and non-condensible gas. The

  7. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  8. A Sensitivity Analysis of a Computer Model-Based Leak Detection System for Oil Pipelines

    OpenAIRE

    Zhe Lu; Yuntong She; Mark Loewen

    2017-01-01

    Improving leak detection capability to eliminate undetected releases is an area of focus for the energy pipeline industry, and the pipeline companies are working to improve existing methods for monitoring their pipelines. Computer model-based leak detection methods that detect leaks by analyzing the pipeline hydraulic state have been widely employed in the industry, but their effectiveness in practical applications is often challenged by real-world uncertainties. This study quantitatively ass...

  9. A Psychometric Examination of the Multidimensional Work Ethic Profile Among Ar Force Enlisted Personnel

    National Research Council Canada - National Science Library

    Miller, Michael

    1998-01-01

    ...) developed by Michael Miller and David Woehr (Miller & Woehr, 1997; Woehr & Miller, 1997). The MWEP is a multidimensional measure of work ethics based on previous research and literature focusing on work ethic and job performance...

  10. Work-Family Attitudes and Beliefs: Implications for Future Air Force Officers

    National Research Council Canada - National Science Library

    Johnson, Stephanie

    2001-01-01

    .... There are many potential consequences of these shifts. These changes impact the very nucleus of work and family, and often result in conflict with the organization's culture as attempts are made to provide balance between work and family...

  11. An environmental education program for maroon communities: the results of a work carried out along the Cabiunas-Vitoria gas pipeline; Programa de educacao ambiental para comunidades quilombolas: a experiencia do trabalho realizado no Gasoduto Cabiunas-Vitoria

    Energy Technology Data Exchange (ETDEWEB)

    Caldas, Flaviana V.; Serricchio, Claudio [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Vieira, Rosa M. [Telsan Engenharia, Vitoria, ES (Brazil)

    2008-07-01

    One of the Environmental Programmes developed for the works of Cabiunas-Vitoria Gas Pipeline (GASCAV) intended to fulfill the conditions of the Installation License, which defined the preparation of Specific Studies and Environmental Programmes to five quilombo communities located at GASCAV's influence area. The challenge of PETROBRAS/Engenharia/IETEG/IEDT Environmental Team was to align the Company's strategic guidelines related to Environmental and Social Responsibility to the necessary criteria for the approval of this Programme by environmental agencies which inspected the Programme: IBAMA (Brazilian Institute of Environment and Renewable Natural Resources) and FCP (Palmares Cultural Foundation). This work aimed to present the methodology adopted to the proposal of the Environmental Education Programme to Quilombo Communities, as well as to discuss the results achieved with the implementation of this Programme. The results allowed to conclude that the actions developed at the quilombo communities has disseminated the environmental concepts and related to the afro culture, has established partnerships and strengthen the relationship with the surrounding communities. This fact promotes the integration of the Work's economic interests with the social and environmental ones, generating a socio environmental conscience among the residents. (author)

  12. An Analysis of Alternate Work Schedules in Selected Air Force Civil Engineering Squadrons.

    Science.gov (United States)

    1982-09-01

    innovative work schedule may cause employee attitudinal changes that are beneficial to employers. For workers, the fundamental feature of flexible working hours is...ipan 0 H 0 1- 150 SELECTED BIBLIOGRAPHY 151 REFERENCES CITED 1. Allenspach, Heinz. Flexible Working Hours . Geneva Switzerland: International Labor...Herman Gadon,and John R. M. Gordon. " Flexible Working Hours : It’s About Time," Har- vard Business Review, January-February 1974, pp. 18-20, 22, 24

  13. Work-Family Conflict: The Effects of Religious Context on Married Women’s Participation in the Labor Force

    Directory of Open Access Journals (Sweden)

    Jenna Griebel Rogers

    2014-07-01

    Full Text Available Past work shows religion’s effect on women’s career decisions, particularly when these decisions involve work-family conflict. This study argues that the religious context of a geographic area also influences women’s solutions to work-family conflict through more or less pervasive normative expectations within the community regarding women’s roles and responsibilities to the family. We use the American Community Survey linked with community-level religious proportions to test the relationship between religious contexts and women’s participation in the labor force in the contiguous United States–2054 census geographic areas. Using spatial analysis, we find that community religious concentration is related to the proportion of women who choose not to work. Communities with a higher proportion of the population belonging to conservative religious traditions also have a greater proportion of married women choosing not to work outside the home.

  14. Cellular Tug-of-War: Forces at Work and DNA Stretching in Mitosis

    Science.gov (United States)

    Griffin, Brian; Kilfoil, Maria L.

    2013-03-01

    In the microscopic world of the cell dominated by thermal noise, a cell must be able to successfully segregate its DNA with high fidelity in order to pass its genetic information on to its progeny. In this process of mitosis in eukaryotes, driving forces act on the cytoskeleton-based architecture called the mitotic spindle to promote this division. Our preliminary data demonstrates that the dynamics of this process in yeast cells is universal. Moreover, the dynamics suggest an increasing load as the chromosomes are pulled apart. To investigate this, we use three-dimensional imaging to track the dynamics of the poles of this architecture and the points of attachment to chromosomes simultaneously and with high spatial resolution. We analyze the relative motions of chromosomes as they are organized before segregation and as they are pulled apart, using this data to investigate the force-response behavior of this cytoskeleton-chromosome polymer system.

  15. Light at work: The use of optical forces for particle manipulation, sorting, and analysis

    Czech Academy of Sciences Publication Activity Database

    Jonáš, Alexandr; Zemánek, Pavel

    2008-01-01

    Roč. 29, č. 24 (2008), s. 4813-4851 ISSN 0173-0835 R&D Projects: GA MŠk(CZ) LC06007; GA MŠk OC08034 Institutional research plan: CEZ:AV0Z20650511 Keywords : microfluidics * optical chromatography and sorting * optical force and torque * optical tweezers and micro-manipulation / Optical tweezers and micro-manipulation / Raman microspectroscopy * Raman microspectroscopy Subject RIV: BH - Optics, Masers, Lasers Impact factor: 3.509, year: 2008

  16. Children of Working Mothers, March 1975: Summary, Special Labor Force Report.

    Science.gov (United States)

    Bureau of Labor Statistics (DOL), Washington, DC.

    The following are some of the findings based on the results of the annual survey of marital and family characteristics of workers: (1) about 27.6 million of 62.7 million children had mothers in the labor force (over 2 million more than in March 1970); (2) 1.1 million of 6.5 million children under six were in families headed by women (71 percent…

  17. Interagency task force on the health effects of ionizing radiation: report of the work group on records and privacy

    International Nuclear Information System (INIS)

    1979-06-01

    Research scientists studying the health effects of ionizing radiation have expressed the view that their work is sometimes impeded by legal restrictions on access to necessary records. In light of the critical importance of scientifically sound, efficient, and timely epidemiological research to resolve the difficult issues raised by the President's memorandum, the Task Force determined to inquire into the extent of this problem, and to ascertain whether new legislation or regulation was needed to eliminate serious roadblocks

  18. Risk from transport of gas by pipeline ''kokui-perm''

    International Nuclear Information System (INIS)

    Yelokhin, A.

    1998-01-01

    Full text of publication follows: the length of gas pipelines in Russia is 142 thousands km, 62 % are pipelines of the large diameters. Annually on gas pipelines in Russia there are more than 70 large accidents, more than 50 % from them is accompanied by ignition of gas. The average ecological looses from accident is: destruction arable lands - 78 hectares; removing from consumption agricultural soils - 6,2 hectares; destruction forests - 47,5 hectares. In work the reasons of accidents on gas pipelines of different diameters are analyzed. So, for pipelines a diameter of 1220 mm by the reasons of accidents are: marriage of civil and erection works - 39, 1 %; outside corrosion - 35,9 %; mechanical damages - 9,4 %; defects of pipes - 6,2 %; defects of the factory equipment - 1,6 %; nature disasters and other reasons - 7,8 %. In work the results of risk analysis on a gas pipeline 'Kokui - Perm' are analysed. The gas pipeline 'Kokui - Perm' passes near 22 towns and countries, crosses 15 highways, 2 rail ways, 15 rivers. In work the concrete recommendations for management of risk and safety of the population are given. (author)

  19. Electrical fingerprint of pipeline defects

    International Nuclear Information System (INIS)

    Mica, Isabella; Polignano, Maria Luisa; Marco, Cinzia De

    2004-01-01

    Pipeline defects are dislocations that connect the source region of the transistor with the drain region. They were widely reported to occur in CMOS, BiCMOS devices and recently in SOI technologies. They can reduce device yield either by affecting the devices functionality or by increasing the current consumption under stand-by conditions. In this work the electrical fingerprint of these dislocations is studied, its purpose is to enable us to identify these defects as the ones responsible for device failure. It is shown that the pipeline defects are responsible for a leakage current from source to drain in the transistors. This leakage has a resistive characteristic and it is lightly modulated by the body bias. It is not sensitive to temperature; vice versa the off-current of a good transistor exhibits the well-known exponential dependence on 1/T. The emission spectrum of these defects was studied and compared with the spectrum of a good transistor. The paper aims to show that the spectrum of a defective transistor is quite peculiar; it shows well defined peaks, whereas the spectrum of a good transistor under saturation conditions is characterized by a broad spectral light emission distribution. Finally the deep-level transient spectroscopy (DLTS) is tried on defective diodes

  20. Creativity in action: elegantly simple idea puts firm on international pipeline map

    Energy Technology Data Exchange (ETDEWEB)

    Podlubny, J.

    2002-05-06

    A saddle bag-like device, a relatively simple invention to carry weights to hold pipelines stable in wet environments, has catapulted a small Athabasca, Alberta, company to international prominence. The saddle bag is made of 100 per cent non-biodegradable material called geotextile, commonly referred to as road matting. The bags have a life expectancy of 100 years or more, easily outlasting the pipe they protect from shifting. Weighting systems are used on pipelines to achieve the negative buoyancy required to prevent them from floating out of wet ground. They are essential in wide swats of the northern areas where the oil and gas industry operates. The saddle bags replace the traditional concrete weights which have been either bolted down or set on top of the pipe. They were bulky and hard to transport, as well as difficult to place on the pipe. In contrast, the saddle bags are easy to transport and easy to install. Indeed, the production process is portable, so that the weighted saddle bags can be made at the site of the pipeline construction job involved. This makes it easier to do pipeline weighting jobs in cold weather, at remote locations or in spots where considerable travel time is involved in completing projects. Saddle Tech has recently joined forces with the giant in the weighting system world from the United States, CRC-Evans. The U.S. firm is marketing the bags under a trademarked name 'the saddle bag'. The product being used on projects in California, as well as on almost 90 per cent of wetlands pipeline work in Alberta and British Columbia. Production was 17,000 bags in the first year of operation. So far this season, more than 40,000 bags have been made and distributed throughout North America. Plans are afoot to expand and convert the production facility to an automated operation, running 24 hours a day.

  1. Energy cost reduction in oil pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Limeira, Fabio Machado; Correa, Joao Luiz Lavoura; Costa, Luciano Macedo Josino da; Silva, Jose Luiz da; Henriques, Fausto Metzger Pessanha [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    One of the key questions of modern society consists on the rational use of the planet's natural resources and energy. Due to the lack of energy, many companies are forced to reduce their workload, especially during peak hours, because residential demand reaches its top and there is not enough energy to fulfill the needs of all users, which affects major industries. Therefore, using energy more wisely has become a strategic issue for any company, due to the limited supply and also for the excessive cost it represents. With the objective of saving energy and reducing costs for oil pipelines, it has been identified that the increase in energy consumption is primordially related to pumping stations and also by the way many facilities are operated, that is, differently from what was originally designed. Realizing this opportunity, in order to optimize the process, this article intends to examine the possibility of gains evaluating alternatives regarding changes in the pump scheme configuration and non-use of pump stations at peak hours. Initially, an oil pipeline with potential to reduce energy costs was chosen being followed by a history analysis, in order to confirm if there was sufficient room to change the operation mode. After confirming the pipeline choice, the system is briefly described and the literature is reviewed, explaining how the energy cost is calculated and also the main characteristics of a pumping system in series and in parallel. In that sequence, technically feasible alternatives are studied in order to operate and also to negotiate the energy demand contract. Finally, costs are calculated to identify the most economical alternative, that is, for a scenario with no increase in the actual transported volume of the pipeline and for another scenario that considers an increase of about 20%. The conclusion of this study indicates that the chosen pipeline can achieve a reduction on energy costs of up to 25% without the need for investments in new

  2. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  3. Pipeline corridors through wetlands

    International Nuclear Information System (INIS)

    Zimmerman, R.E.; Wilkey, P.L.; Isaacson, H.R.

    1992-01-01

    This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity

  4. Global offshore pipeline markets

    International Nuclear Information System (INIS)

    Knight, R.; Parsons, B.

    2001-01-01

    In this article, two experts forecast a recovery in the offshore pipeline market followed by accelerating growth. A number of clearly definable macro trends are affecting the world offshore oil and gas industry and will be of considerable significance to the offshore pipelines industry. The authors' view is of markets that show every chance of enjoying long-term growth prospects driven by the fundamentals of a continuing increase in demand for offshore oil and gas. The offshore industry however has a highly cyclical nature, due to the impact of variations in oil and gas prices and the differing state of maturity of individual regions. Therefore those companies that are able to offer the widest range of pipe types and diameters and methods of installation across the greatest range of geographic markets are likely to prosper most. Thus, this continues to be a market best suited to those able to operate on a global scale and make a corporate commitment measured in decades

  5. A computational genomics pipeline for prokaryotic sequencing projects.

    Science.gov (United States)

    Kislyuk, Andrey O; Katz, Lee S; Agrawal, Sonia; Hagen, Matthew S; Conley, Andrew B; Jayaraman, Pushkala; Nelakuditi, Viswateja; Humphrey, Jay C; Sammons, Scott A; Govil, Dhwani; Mair, Raydel D; Tatti, Kathleen M; Tondella, Maria L; Harcourt, Brian H; Mayer, Leonard W; Jordan, I King

    2010-08-01

    New sequencing technologies have accelerated research on prokaryotic genomes and have made genome sequencing operations outside major genome sequencing centers routine. However, no off-the-shelf solution exists for the combined assembly, gene prediction, genome annotation and data presentation necessary to interpret sequencing data. The resulting requirement to invest significant resources into custom informatics support for genome sequencing projects remains a major impediment to the accessibility of high-throughput sequence data. We present a self-contained, automated high-throughput open source genome sequencing and computational genomics pipeline suitable for prokaryotic sequencing projects. The pipeline has been used at the Georgia Institute of Technology and the Centers for Disease Control and Prevention for the analysis of Neisseria meningitidis and Bordetella bronchiseptica genomes. The pipeline is capable of enhanced or manually assisted reference-based assembly using multiple assemblers and modes; gene predictor combining; and functional annotation of genes and gene products. Because every component of the pipeline is executed on a local machine with no need to access resources over the Internet, the pipeline is suitable for projects of a sensitive nature. Annotation of virulence-related features makes the pipeline particularly useful for projects working with pathogenic prokaryotes. The pipeline is licensed under the open-source GNU General Public License and available at the Georgia Tech Neisseria Base (http://nbase.biology.gatech.edu/). The pipeline is implemented with a combination of Perl, Bourne Shell and MySQL and is compatible with Linux and other Unix systems.

  6. Russia: the pipeline diplomacy

    International Nuclear Information System (INIS)

    Bourdillon, Y.

    2005-01-01

    First world producer of oil and gas, Russia wishes to use its mastery of energy distribution to recover its great power status. The oil and gas pipelines network is the basement used by Russia to build up its hegemony in Europe. The Russian oil and gas companies are also carrying out a long-term strategy of international expansion, in particular thanks to investments in the neighboring countries for the building of new infrastructures or the purchase of oil refineries. (J.S.)

  7. Pipeline Optimization Program (PLOP)

    Science.gov (United States)

    2006-08-01

    the framework of the Dredging Operations Decision Support System (DODSS, https://dodss.wes.army.mil/wiki/0). PLOP compiles industry standards and...efficiency point ( BEP ). In the interest of acceptable wear rate on the pump, industrial standards dictate that the flow Figure 2. Pump class as a function of...percentage of the flow rate corresponding to the BEP . Pump Acceptability Rules. The facts for pump performance, industrial standards and pipeline and

  8. Proceedings of the ice scour and Arctic marine pipelines workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    This conference was organized to discuss the challenges facing engineers in Arctic offshore oil and gas operations, particularly those dealing with the design, installation and operation of offshore pipelines. Adding to the usual engineering considerations, formidable enough in themselves, Arctic offshore pipelines also face constraints due to permafrost, ice cover, and ice scouring from icebergs. In addition to an examinations of the roles played by these constraints, the forces and deformation mechanisms experienced by different soils during ice scouring events, modeling the scouring process and the application of models to the issue of pipeline burial and protection were other topics that were addressed by various speakers. Some of the regulatory concerns regarding issues for Arctic pipelines were also discussed. refs., tabs., figs.

  9. Effects of laminations in pipes to resistance and working life of pipelines; Auswirkung von Doppelungen in Rohren auf die Festigkeit und die Lebensdauer von Mineraloelfernleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Camp, H.J. de la; Feser, G; Schmidt, H [Technischer Ueberwachungs-Verein Bayern Hessen Sachsen e.V., Muenchen (Germany)

    1998-03-01

    The effect of load cycles on pipes with laminations was examined to obtain information about the effects on resistance and working life. Material tests carried out in connection with threshold load tests showed that laminations or also segregations in pipes welded with longitudinal seams always run parallel to the surface and that even with the slight enlargement that sometimes occurs under threshold loading, resistance and working life are not reduced. (orig.) [Deutsch] Die Auswirkung von dynamischen Belastungen auf dopplungsbehaftete Rohre wurde untersucht, um Erkenntnisse hinsichtlich der Beeinflussung auf die Festigkeit der Lebensdauer zu gewinnen. Durchgefuehrte Werkstoffuntersuchungen im Zusammenhang mit Schwelllastversuchen zeigten, dass Doppelungen oder auch Seigerungen in laengsnahtgeschweissten Rohren immer oberflaechenparallel verlaufen und dass selbst bei der unter Schwellastbeanspruchung teilweise eingetretenen geringfuegigen Vergroesserung die Festigkeit und die Lebensdauer nicht eingeschraenkt wird. (orig.)

  10. United States Air Force Academy Educational Outcomes Assessment Working Group. Phase 2

    National Research Council Canada - National Science Library

    Porter, David

    1997-01-01

    This publication provides an account of educational outcomes assessment activity undertaken by seven assessment teams under the Phase II Charter of the Dean of the Faculty's Educational Outcomes Assessment Working Group...

  11. Facility Reliability and Maintainability: An Investigation of the Air Force Civil Engineering Recurring Work Program

    Science.gov (United States)

    1989-09-01

    18:2). A recent survey by the Strategic Air Command (SAC) Mechanical Fquipment Management Evaluation Team ( MEMET ) determined that equipment was...identified by MEMET included Maintenance Action Sheets (MAS) that reported work which was not completed, and other MAS which annotated recurring work...readily apparent. Problem Military. The Deputy Chief of Staff for Engineering and Services, HQ SAC, established the MEMET in 1984 in response to a

  12. United States petroleum pipelines: An empirical analysis of pipeline sizing

    Science.gov (United States)

    Coburn, L. L.

    1980-12-01

    The undersizing theory hypothesizes that integrated oil companies have a strong economic incentive to size the petroleum pipelines they own and ship over in a way that means that some of the demand must utilize higher cost alternatives. The DOJ theory posits that excess or monopoly profits are earned due to the natural monopoly characteristics of petroleum pipelines and the existence of market power in some pipelines at either the upstream or downstream market. The theory holds that independent petroleum pipelines owned by companies not otherwise affiliated with the petroleum industry (independent pipelines) do not have these incentives and all the efficiencies of pipeline transportation are passed to the ultimate consumer. Integrated oil companies on the other hand, keep these cost efficiencies for themselves in the form of excess profits.

  13. Pipelines : moving biomass and energy

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, A. [Alberta Univ., Edmonton, AB (Canada). Dept. of Mechanical Engineering

    2006-07-01

    Moving biomass and energy through pipelines was presented. Field sourced biomass utilization for fuel was discussed in terms of competing cost factors; economies of scale; and differing fuel plant sizes. The cost versus scale in a bioenergy facility was illustrated in chart format. The transportation cost of biomass was presented as it is a major component of total biomass processing cost and is in the typical range of 25-45 per cent of total processing costs for truck transport of biomass. Issues in large scale biomass utilization, scale effects in transportation, and components of transport cost were identified. Other topics related to transportation issues included approaches to pipeline transport; cost of wood chips in pipeline transport; and distance variable cost of transporting wood chips by pipeline. Practical applications were also offered. In addition, the presentation provided and illustrated a model for an ethanol plant supplied by truck transport as well as a sample configuration for 19 truck based ethanol plants versus one large facility supplied by truck plus 18 pipelines. Last, pipeline transport of bio-oil and pipeline transport of syngas was discussed. It was concluded that pipeline transport can help in reducing congestion issues in large scale biomass utilization and that it can offer a means to achieve large plant size. Some current research at the University of Alberta on pipeline transport of raw biomass, bio-oil and hydrogen production from biomass for oil sands and pipeline transport was also presented. tabs., figs.

  14. Labor Force

    Science.gov (United States)

    Occupational Outlook Quarterly, 2012

    2012-01-01

    The labor force is the number of people ages 16 or older who are either working or looking for work. It does not include active-duty military personnel or the institutionalized population, such as prison inmates. Determining the size of the labor force is a way of determining how big the economy can get. The size of the labor force depends on two…

  15. Mental health issues in the workplace: maintaining a productive work force.

    Science.gov (United States)

    Raderstorf, Mark; Kurtz, Jennifer

    2006-08-01

    Occupational health nurses must intervene early and validate the conditions and experiences of employees with psychiatric disabilities. Occupational health nurses must ensure employees are receiving appropriate treatment. They must be aware of and prepared to mitigate iatrogenic influences. Occupational health nurses can facilitate resolution of workplace conflicts and issues regarding changing supervisors or departments. They can also facilitate return to work by establishing clear restrictions and coordinating accommodations. compassionate and supportive, yet assertive, approach is key to managing mental health disability. It will, in most cases, facilitate successful return to full-time work.

  16. Length of Working Life for Men and Women, 1970. Special Labor Force Report 187. Revised.

    Science.gov (United States)

    Fullerton, Howard N., Jr.; Byrne, James J.

    Noting that data from 1970 working life tables indicate that since 1960 worklife expectancy has continued to edge downward for men and to lengthen for women, this report briefly discusses continuing trends in the worklife of men and women from 1900 through 1970. Women's worklife is presented in terms of single women; mothers; widowed, divorced,…

  17. Do body weight and gender shape the work force? The case of Iceland.

    Science.gov (United States)

    Asgeirsdottir, Tinna Laufey

    2011-03-01

    Most studies of the relationship between body weight - as well as its corollary, beauty - and labor-market outcomes have indicated that it is a function of a gender bias, the negative relationship between excess weight or obesity and labor-market outcomes being greater for women than for men. Iceland offers an exceptional opportunity to examine this hypothesis, given that it scores relatively well on an index of gender equality comprising economic, political, educational, labor-market, and health-based criteria. Equipped with an advanced level of educational attainment, on average, women are well represented in Iceland's labor force. When it comes to women's presence in the political sphere, Iceland is out of the ordinary as well; that Icelanders were the first in the world to elect a woman to be president may suggest a relatively gender-blind assessment in the labor market. In the current study, survey data collected by Gallup Iceland in 2002 are used to examine the relationship between weight and employment within this political and social setting. Point estimates indicate that, despite apparently lesser gender discrimination in Iceland than elsewhere, the bias against excess weight and obesity remains gender-based, showing a slightly negative relationship between weight and the employment rate of women, whereas a slightly positive relationship was found for men. Copyright © 2010 Elsevier B.V. All rights reserved.

  18. Renal pathology in working dogs in the South African National Defence Force : research communication

    Directory of Open Access Journals (Sweden)

    R.P. Short

    1999-07-01

    Full Text Available Urine analysis, serumbiochemical profile and a cortical wedge biopsy for histopathological examination was performed on 42 South African National Defence Force (SANDF dogs from around the country. The only significant finding on urine analysis and serum biochemistry was a relatively large number (16/42 of dogs with elevated serum inorganic phosphate levels. Histopathology revealed that only 9 of the animals had normal kidneys reflected in the wedge biopsy material, with over 50%of them showing signs of glomerular pathology (primarily mesangioproliferative glomerulonephritis. Other conditions detected histopathologically were haemosiderosis (47 % of animals, focal nephrosis (2.4 %, membranoproliferative glomerulonephritis (2.4 %, focal interstitial nephritis (4.7 % and acute tubular nephrosis (4.7 %. The lesions observed were of limited distribution and extent; this histopathological finding may account for the absence of significant abnormalities on urine analysis or serum biochemistry profiles. It appears from these results that a large percentage of the SANDF population would be expected to have mild renal lesions, but that these lesions are not severe enough to lead to clinical signs. The findings of this study are similar to those of randomly selected populations of non-military dogs performed in other areas of the world, which also demonstrated an unexpectedly high incidence of histopathological renal pathology in dogs considered healthy. These lesions may well, however, play a role in later life, and it is recommended that military veterinarians maintain an index of suspicion for renal disease, particularly glomerular disease. The aetiology of the histopathological lesions is unknown.

  19. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  20. Incidental electric heating of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sonninskii, A V; Sirotin, A M; Vasiliev, Y N

    1981-04-01

    VNIIgaz has improved the conventional Japanese SECT pipeline-heating system, which uses a small steel tube that contains an insulated heater/conductor and is welded to the top of the pipeline. The improved version has two insulated electric heaters - one on the top and the other on the bottom of the pipeline - located inside steel angle irons that are welded to the pipeline. A comparison of experimental results from heating a 200-ft pipeline with both systems at currents of up to 470 A clearly demonstrated the better heating efficiency of the VNIIgaz unit. The improved SECT system would be suitable for various types of pipelines, including gas lines, in the USSR's far north regions.

  1. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Regulations to require operators of gas distribution pipelines to develop and implement integrity management...

  2. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-01-13

    ... Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' The final rule...

  3. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  4. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0156] Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of advisory committee...

  5. Increased Women's Labour Force Participation in Europe: Progress in the Work-Life Balance or Polarization of Behaviours?

    OpenAIRE

    Thevenon, Olivier

    2009-01-01

    This paper analyses trends in women?s labour market situations between 1992 and 2005 using data from the European Labour Force Surveys (EU-LFS). These situations are modelled to capture the effects of the presence of a child or children, the age of the youngest child, the mother?s age at first birth and the presence of a spouse on women?s employment and working hours, and to see how they change over time. The trends observed in some countries challenge the geographical breakdown proposed by t...

  6. Kepler Science Operations Center Pipeline Framework

    Science.gov (United States)

    Klaus, Todd C.; McCauliff, Sean; Cote, Miles T.; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Middour, Christopher; Caldwell, Douglas A.; Jenkins, Jon M.

    2010-01-01

    The Kepler mission is designed to continuously monitor up to 170,000 stars at a 30 minute cadence for 3.5 years searching for Earth-size planets. The data are processed at the Science Operations Center (SOC) at NASA Ames Research Center. Because of the large volume of data and the memory and CPU-intensive nature of the analysis, significant computing hardware is required. We have developed generic pipeline framework software that is used to distribute and synchronize the processing across a cluster of CPUs and to manage the resulting products. The framework is written in Java and is therefore platform-independent, and scales from a single, standalone workstation (for development and research on small data sets) to a full cluster of homogeneous or heterogeneous hardware with minimal configuration changes. A plug-in architecture provides customized control of the unit of work without the need to modify the framework itself. Distributed transaction services provide for atomic storage of pipeline products for a unit of work across a relational database and the custom Kepler DB. Generic parameter management and data accountability services are provided to record the parameter values, software versions, and other meta-data used for each pipeline execution. A graphical console allows for the configuration, execution, and monitoring of pipelines. An alert and metrics subsystem is used to monitor the health and performance of the pipeline. The framework was developed for the Kepler project based on Kepler requirements, but the framework itself is generic and could be used for a variety of applications where these features are needed.

  7. PLUGGING AND UNPLUGGING OF WASTE TRANSFER PIPELINES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    This project, which began in FY97, involves both the flow loop research on plugging and unplugging of waste transfer pipelines, and the large-scale industrial equipment test of plugging locating and unplugging technologies. In FY98, the related work was performed under the project name ''Mixing, Settling, and Pipe Unplugging of Waste Transfer Lines.'' The mixing, settling, and pipeline plugging and unplugging are critical to the design and maintenance of a waste transfer pipeline system, especially for the High-Level Waste (HLW) pipeline transfer. The major objective of this work is to recreate pipeline plugging conditions for equipment testing of plug locating and removal and to provide systematic operating data for modification of equipment design and enhancement of performance of waste transfer lines used at DOE sites. As the waste tank clean-out and decommissioning program becomes active at the DOE sites, there is an increasing potential that the waste slurry transfer lines will become plugged and unable to transport waste slurry from one tank to another or from the mixing tank to processing facilities. Transfer systems may potentially become plugged if the solids concentration of the material being transferred increases beyond the capability of the prime mover or if upstream mixing is inadequately performed. Plugging can occur due to the solids' settling in either the mixing tank, the pumping system, or the transfer lines. In order to enhance and optimize the slurry's removal and transfer, refined and reliable data on the mixing, sampling, and pipe unplugging systems must be obtained based on both laboratory-scale and simulated in-situ operating conditions

  8. 49 CFR 195.210 - Pipeline location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  9. Identifying Factors Reinforcing Robotization: Interactive Forces of Employment, Working Hour and Wage

    Directory of Open Access Journals (Sweden)

    Joonmo Cho

    2018-02-01

    Full Text Available Unlike previous studies on robotization approaching the future based on the cutting-edge technologies and adopting a framework where robotization is considered as an exogenous variable, this study considers that robotization occurs endogenously and uses it as a dependent variable for an objective examination of the effect of robotization on the labor market. To this end, a robotization indicator is created based on the actual number of industrial robots currently deployed in workplaces, and a multiple regression analysis is performed using the robotization indicator and labor variables such as employment, working hours, and wage. The results using the multiple regression considering the triangular relationship of employment–working-hours–wages show that job destruction due to robotization is not too remarkable yet that use. Our results show the complementary relation between employment and robotization, but the substituting relation between working hour and robotization. The results also demonstrate the effects of union, the size of the company and the proportion of production workers and simple labor workers etc. These findings indicate that the degree of robotization may vary with many factors of the labor market. Limitations of this study and implications for future research are also discussed.

  10. Slurry pipeline technology: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Jay P. [Pipeline Systems Incorporated (PSI), Belo Horizonte, MG (Brazil); Lima, Rafael; Pinto, Daniel; Vidal, Alisson [Ausenco do Brasil Engenharia Ltda., Nova Lima, MG (Brazil). PSI Div.

    2009-12-19

    Slurry pipelines represent an economical and environmentally friendly transportation means for many solid materials. This paper provides an over-view of the technology, its evolution and current Brazilian activity. Mineral resources are increasingly moving farther away from ports, processing plants and end use points, and slurry pipelines are an important mode of solids transport. Application guidelines are discussed. State-of-the-Art technical solutions such as pipeline system simulation, pipe materials, pumps, valves, automation, telecommunications, and construction techniques that have made the technology successful are presented. A discussion of where long distant slurry pipelines fit in a picture that also includes thickened and paste materials pipe lining is included. (author)

  11. The Migration of the Work Force from Romania Abroad: Reasons, Possibilities, Chances, Implications

    OpenAIRE

    Cecilia Irina-Răbonţu; Amelia Georgiana Boncea

    2009-01-01

    Even though in Romania there are a few social categories with incomes comparable to those of the Occidentals: enterprisers, notaries, the wage earners working in banks and communications, peasants that sold their lands for millions of Euros, but also enough budgetary people and, as well, all kinds of dodgers, corrupt civil servants or combinatory people. All of them have monthly incomes of at least 2.000 Euros, their wage being the only thing they have in common. However their number is not n...

  12. Telecommuters: the stay-at-home work force of the future

    Energy Technology Data Exchange (ETDEWEB)

    Eder, P.F.

    1983-06-01

    The spread of teleworkers who commute via telecommunications from their home offices will depend, despite the energy-saving and tax advantages of self-employment, on how fast the social climate accepts teleworking, whether software can be made friendlier, and whether legal issues of database networks are resolved. The societal changes associated with home offices can be either a positive reemphasis on the home or a negative electronic sweatshop and a way to export office work to low-wage areas. The author, who sees a gradual adoption of teleworking while these technological, societal, and marketing barriers are dealt with, develops a scenario for an information society of the future. (DCK)

  13. Technology assessment of long distance liquid natural gas pipelines. Phase 9. Available and/or required equipment

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    This phase of the technology assessment of liquid natural gas pipelines assembles a listing of the materials and equipment which might be used to mechanically build an LNG pipeline. It lists material and equipment which practically could be used in such a pipeline either at a present state of the art, or by adaptation in terms of materials or techniques, or after some development work. Other than that the material and equipment is proposed for use in an LNG pipeline, no new real concept of pipeline or refrigeration plant equipment is proposed. Rather the equipment has been selected so as to conform as closely as possible to established pipeline practice.

  14. 76 FR 44985 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2011-07-27

    .... PHMSA-2011-0177] Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding AGENCY... liquid pipelines to communicate the potential for damage to pipeline facilities caused by severe flooding... pipelines in case of flooding. ADDRESSES: This document can be viewed on the Office of Pipeline Safety home...

  15. 78 FR 30964 - Pipeline Safety: Workshop on Public Awareness Programs

    Science.gov (United States)

    2013-05-23

    ... Richardson, Texas. The workshop serves as an opportunity to bring pipeline safety stakeholders together to..., and excavators) will share their perspectives on what is working and what is not working with existing... discuss recent inspection findings; (2) Understand what's working and not working with public awareness...

  16. 77 FR 19799 - Pipeline Safety: Pipeline Damage Prevention Programs

    Science.gov (United States)

    2012-04-02

    ... noted ``when the oil pipeline industry developed the survey for its voluntary spill reporting system...) [cir] The American Public Gas Association (APGA) [cir] The Association of Oil Pipelines (AOPL) [cir... the contrary, all 50 states in the United States have a law designed to prevent excavation damage to...

  17. Cooling pipeline disposing structure for large-scaled cryogenic structure

    International Nuclear Information System (INIS)

    Takahashi, Hiroyuki.

    1996-01-01

    The present invention concerns an electromagnetic force supporting structure for superconductive coils. As the size of a cryogenic structure is increased, since it takes much cooling time, temperature difference between cooling pipelines and the cryogenic structure is increased over a wide range, and difference of heat shrinkage is increased to increase thermal stresses. Then, in the cooling pipelines for a large scaled cryogenic structure, the cooling pipelines and the structure are connected by way of a thin metal plate made of a material having a heat conductivity higher than that of the material of the structure by one digit or more, and the thin metal plate is bent. The displacement between the cryogenic structure and the cooling pipelines caused by heat shrinkage is absorbed by the elongation/shrinkage of the bent structure of the thin metal plate, and the thermal stresses due to the displacement is reduced. In addition, the heat of the cryogenic structures is transferred by way of the thin metal plate. Then, the cooling pipelines can be secured to the cryogenic structure such that cooling by heat transfer is enabled by absorbing a great deviation or three dimensional displacement due to the difference of the temperature distribution between the cryogenic structure enlarged in the scale and put into the three dimensional shape, and the cooling pipelines. (N.H.)

  18. Lay Pipeline Abandonment Head during Some

    African Journals Online (AJOL)

    2016-12-01

    Dec 1, 2016 ... is very cruel to the structural integrity of the pipeline structure after ... and properties may be jeopardized should the pipeline structure be used for oil or gas transport when such ... pipelines under bending may alter the material.

  19. Pipeline Processing for VISTA

    Science.gov (United States)

    Lewis, J. R.; Irwin, M.; Bunclark, P.

    2010-12-01

    The VISTA telescope is a 4 metre instrument which has recently been commissioned at Paranal, Chile. Equipped with an infrared camera, 16 2Kx2K Raytheon detectors and a 1.7 square degree field of view, VISTA represents a huge leap in infrared survey capability in the southern hemisphere. Pipeline processing of IR data is far more technically challenging than for optical data. IR detectors are inherently more unstable, while the sky emission is over 100 times brighter than most objects of interest, and varies in a complex spatial and temporal manner. To compensate for this, exposure times are kept short, leading to high nightly data rates. VISTA is expected to generate an average of 250 GB of data per night over the next 5-10 years, which far exceeds the current total data rate of all 8m-class telescopes. In this presentation we discuss the pipelines that have been developed to deal with IR imaging data from VISTA and discuss the primary issues involved in an end-to-end system capable of: robustly removing instrument and night sky signatures; monitoring data quality and system integrity; providing astrometric and photometric calibration; and generating photon noise-limited images and science-ready astronomical catalogues.

  20. Diverless pipeline repair system for deep water

    Energy Technology Data Exchange (ETDEWEB)

    Spinelli, Carlo M. [Eni Gas and Power, Milan (Italy); Fabbri, Sergio; Bachetta, Giuseppe [Saipem/SES, Venice (Italy)

    2009-07-01

    SiRCoS (Sistema Riparazione Condotte Sottomarine) is a diverless pipeline repair system composed of a suite of tools to perform a reliable subsea pipeline repair intervention in deep and ultra deep water which has been on the ground of the long lasting experience of Eni and Saipem in designing, laying and operating deep water pipelines. The key element of SiRCoS is a Connection System comprising two end connectors and a repair spool piece to replace a damaged pipeline section. A Repair Clamp with elastomeric seals is also available for pipe local damages. The Connection System is based on pipe cold forging process, consisting in swaging the pipe inside connectors with suitable profile, by using high pressure seawater. Three swaging operations have to be performed to replace the damaged pipe length. This technology has been developed through extensive theoretical work and laboratory testing, ending in a Type Approval by DNV over pipe sizes ranging from 20 inches to 48 inches OD. A complete SiRCoS system has been realised for the Green Stream pipeline, thoroughly tested in workshop as well as in shallow water and is now ready, in the event of an emergency situation.The key functional requirements for the system are: diverless repair intervention and fully piggability after repair. Eni owns this technology and is now available to other operators under Repair Club arrangement providing stand-by repair services carried out by Saipem Energy Services. The paper gives a description of the main features of the Repair System as well as an insight into the technological developments on pipe cold forging reliability and long term duration evaluation. (author)

  1. Advances in riser and pipeline technologies

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Wan C.; Mortazavi, Mehrdad; Weir, Michael S. [ExxonMobil Development Company, Dallas, TX (United States)

    2009-12-19

    As oil and gas production continues to move into new frontier areas, novel applications of the existing riser and pipeline technologies need to be developed to meet the often more stringent requirements encountered in these environments. The challenges include ultra deep water, harsh environments, aggressive fluid conditions, and local content objectives, etc. They will require industry to constantly extend, expand, and enhance the broad range of solution options. Also, the existing design criteria in industry may need to be revised or new criteria may need to be developed to satisfy these needs. Exxon Mobil (Em) employs, and works with others in industry to promote robust design and operating practices. This approach requires in-depth understanding, sound engineering principles, advanced analysis, uncertainty management, and supportive qualification test data. It enables confident selection, extrapolation, and innovation of technologies to address new riser system and pipeline challenges. Focus on fundamental is imperative to ensure integrity of the selected systems during fabrication, installation, and operation phases. Recent and past project experience in deep water Gulf of Mexico and West Africa provides many successful examples of this approach. This paper reviews several examples of the key riser system and pipeline technology enhancements recently achieved by EM to provide confidence in addressing technical and project application challenges. Riser system technology enhancements addressed in this paper include steel catenary riser (SCR) application on turret-moored FPSO with severe motions, pipe-in-pipe (PIP) hybrid production riser to effectively manage gas lift and flow assurance requirements, irregular wave analysis methodology for flexible risers and umbilicals to reduce conservatism, and qualification of riser and pipeline VIV prediction and mitigation methods. Pipeline technology enhancements detailed in this paper include lateral buckling prediction

  2. Pipeline dynamics subject to restraints with clearance

    International Nuclear Information System (INIS)

    Loula, A.F.D.; Guerreiro, J.N.C.

    1980-12-01

    The principle of virtual works at its incremental form, is utilized for the formulation of flat pipeline vibration problems, of elastic-plastic behavior, submitted to restraints with clearance (also with elastic-plastic behavior) and with viscous damping. The possibility of uniform movement of the support, that simulates the seismic action is also considered. The finite element method and an integration time algorithm, are utilized for the problem resolution. Some examples ilustrate the application of the development program. (Author) [pt

  3. Performance of MSGC with analog pipeline readout

    International Nuclear Information System (INIS)

    Gomez, F.; Adeva, B.; Gracia, G.; Lopez, M.A.; Nunez, T.; Pazos, A.; Plo, M.; Rodriguez, A.; Santamarina, C.; Vazquez, P.

    1997-01-01

    We analyse some of the performance characteristics of a chromium MSGC operated with Ar-DME 50%-50% in a test beam at CERN. Excellent signal-to-noise ratio and efficiency has been achieved with this gas mixture using cathode analog pipeline readout. We also determine optimal parameters for the sampling algorithm in order to work in a random trigger experiment (fixed target). (orig.)

  4. The Joint Commission has provided a tool to change your work force: are you paying attention?

    Science.gov (United States)

    Decker, P J; Strader, M K

    1998-03-01

    Most health care managers wonder how to change employee "attitudes" so that their staff will be more accountable for patient satisfaction, cost reduction, and quality of care. Employees were trained to function in an industry where the power players were the physician and the administrator and now it is exceedingly difficult to get them to switch their attention to the patient and the payer in a market-driven economy. For hospital managers, the answer may be right at their fingertips: The Joint Commission on Accreditation of Healthcare Organizations' standards demanding that employee competence be objectively measured, proven, tracked & trended, improved, and age specific. A comprehensive competence assessment system can save the health care manager enormous work in measuring fewer things, focusing performance assessment on the 20 percent of things that are true problems, and helping to specifically define certain competencies such as customer focus and cost consciousness so that coaching, training, and giving performance feedback is easier. Developing a comprehensive competence assessment system is a powerful tool to change the culture of organizations. Consequently, it is important that managers be aware of those possibilities before they embark on developing "competencies" or before their organizations get too carried away on redesigning systems to satisfy standards.

  5. Simulation of high consequence areas for gas pipelines

    OpenAIRE

    Orlando Díaz-Parra; Enrique Vera-López

    2018-01-01

    The gas pipeline is used for the transport of natural gas at a great distance. Risks derived from the handling of a combustible material transported under high pressure, by pipelines that pass close to where people live, makes it necessary to adopt prevention, mitigation and control measures to reduce the effect in case of ignition of a gas leak. This work shows the development of a new mathematical model to determine areas of high consequence and their application, using widely available and...

  6. Experience with two pipeline river crossings in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Yaremko, Eugene [Northwest Hydraulic Consultants (NHC), Edmonton (Canada); D' Agnillo, Pablo; Diaz, Jose A. [Minera Alumbrera XTRADA Copper S.A., Buenos Aires (Argentina); Bravo, Claudio

    2009-12-19

    The Alumbrera copper-gold mine located in the Province of Catamarca, northwest region of Argentina, commenced operation in October, 1997. Mine development included a 316 km long, 175 mm diameter slurry pipeline that conveys copper concentrate to a dewatering facility near the city of Tucuman, Province of Tucuman. It became apparent during the first few years of operation that, given the many potential risks of pipeline exposure associated with stream crossings, Minera Alumbrera would have to undertake an aggressive, formal program of risk management of crossings and risk mitigation. In this paper, the experience associated with two crossings is addressed: Rio Villavil; and, Rio Gastona. The original pipeline route through the 10 km length of pipeline connecting Pump Station (PS) 2 to PS 3 was directed along the bottom of the Rio Villavil valley, with most of it located within the flood way of the stream. The exposure of the pipeline at some locations and high risk of further pipeline exposures led to initiation of risk mitigation planning. Remediation work was completed by 2008. Rio Gastona, during the summer of 2001, experienced rapid shifting of the left bank at the crossing resulting in an undermined and unsupported length of pipeline. The subsequent risk mitigation method adopted in 2001 involved the planning and construction of groyne fields along both banks. (author)

  7. Also deputies will say something to new pipeline of Slovnaft

    International Nuclear Information System (INIS)

    Marcan, P.

    2005-01-01

    The oil transit company, Transpetrol, expects the new Bratislava-Schwechat pipeline connecting the OMV refinery to the Druzba pipeline to increase the use of the pipeline and improve company revenues by 20%. The Austrian project partner, OMV, looks to the project to decrease transportation costs for Russian oil. One sixth of the 60 km pipeline will be built in Slovakia, but there is a problem - the Slovak Ministry of Environment and the City of Bratislava have not approved the route proposed by Transpetrol. In their opinion, the propose route would endanger the protected area, Zitny ostrov, that provides drinking water to the capital. Slovnaft also plans a new pipeline to replace the old obsolete one used to transport its products to the mineral oils transhipment centre at Bratislava docks. One of the alternatives proposed by Slovnaft is the construction of a pipeline and transhipment centre on Zitny ostrov. Unlike the Transpetrol project, this has already received approval from the Ministry of Environment. Before construction work on the pipeline to Schwechat can start. OMV will have resolve issues related to the supply of oil from Russia. According to the original plans, Yukos, which owns a 49% stake in Transpetrol, was to supply the oil. But due to tax problems in Russia, Yukos lost its main drilling division, Juganskneftgaz

  8. Condition Monitoring Of Operating Pipelines With Operational Modal Analysis Application

    Directory of Open Access Journals (Sweden)

    Mironov Aleksey

    2015-12-01

    Full Text Available In the petroleum, natural gas and petrochemical industries, great attention is being paid to safety, reliability and maintainability of equipment. There are a number of technologies to monitor, control, and maintain gas, oil, water, and sewer pipelines. The paper focuses on operational modal analysis (OMA application for condition monitoring of operating pipelines. Special focus is on the topicality of OMA for definition of the dynamic features of the pipeline (frequencies and mode shapes in operation. The research was conducted using two operating laboratory models imitated a part of the operating pipeline. The results of finite-element modeling, identification of pipe natural modes and its modification under the influence of virtual failure are discussed. The work considers the results of experimental research of dynamic behavior of the operating pipe models using one of OMA techniques and comparing dynamic properties with the modeled data. The study results demonstrate sensitivity of modal shape parameters to modification of operating pipeline technical state. Two strategies of pipeline repair – with continuously condition-based monitoring with proposed technology and without such monitoring, was discussed. Markov chain reliability models for each strategy were analyzed and reliability improvement factor for proposed technology of monitoring in compare with traditional one was evaluated. It is resumed about ability of operating pipeline condition monitoring by measuring dynamic deformations of the operating pipe and OMA techniques application for dynamic properties extraction.

  9. Accuracy Limitations of Pipelined ADCs

    NARCIS (Netherlands)

    Quinn, P.J.; Roermund, van A.H.M.

    2005-01-01

    In this paper, the key characteristics of the main errors which affect the performance of a switched capacitor pipelined ADC are presented and their effects on the ADC transfer characteristics demonstrated. Clear and concise relationships are developed to aid optimized design of the pipeline ADC and

  10. Design Criteria for Suspended Pipelines Based on Structural Analysis

    Directory of Open Access Journals (Sweden)

    Mariana Simão

    2016-06-01

    Full Text Available Mathematical models have become the target of numerous attempts to obtain results that can be extrapolated to the study of hydraulic pressure infrastructures associated with different engineering requests. Simulation analysis based on finite element method (FEM models are used to determine the vulnerability of hydraulic systems under different types of actions (e.g., natural events and pressure variation. As part of the numerical simulation of a suspended pipeline, the adequacy of existing supports to sustain the pressure loads is verified. With a certain value of load application, the pipeline is forced to sway sideways, possibly lifting up off its deadweight supports. Thus, identifying the frequency, consequences and predictability of accidental events is of extreme importance. This study focuses on the stability of vertical supports associated with extreme transient loads and how a pipeline design can be improved using FEM simulations, in the design stage, to avoid accidents. Distribution of bending moments, axial forces, displacements and deformations along the pipeline and supports are studied for a set of important parametric variations. A good representation of the pipeline displacements is obtained using FEM.

  11. Using industry ROV videos to assess fish associations with subsea pipelines

    Science.gov (United States)

    McLean, D. L.; Partridge, J. C.; Bond, T.; Birt, M. J.; Bornt, K. R.; Langlois, T. J.

    2017-06-01

    Remote Operated Vehicles are routinely used to undertake inspection and maintenance activities of underwater pipelines in north-west Australia. In doing so, many terabytes of geo-referenced underwater video are collected at depths, and on a scale usually unobtainable for ecological research. We assessed fish diversity and abundance from existing ROV videos collected along 2-3 km sections of two pipelines in north-west Australia, one at 60-80 m water depth and the other at 120-130 m. A total of 5962 individual fish from 92 species and 42 families were observed. Both pipelines were characterised by a high abundance of commercially important fishes including: snappers (Lutjanidae) and groupers (Epinephelidae). The presence of thousands of unidentifiable larval fish, in addition to juveniles, sub-adults and adults suggests that the pipelines may be enhancing, rather than simply attracting, fish stocks. The prevalence and high complexity of sponges on the shallower pipeline and of deepwater corals on the deeper pipeline had a strong positive correlation with the fish abundance. These habitats likely offer a significant food source and refuge for fish, but also for invertebrates upon which fish feed. A greater diversity on the shallower pipeline, and a higher abundance of fishes on both pipelines, were associated with unsupported pipeline sections (spans) and many species appeared to be utilising pipeline spans as refuges. This study is a first look at the potential value of subsea pipelines for fishes on the north-west shelf. While the results suggest that these sections of pipeline appear to offer significant habitat that supports diverse and important commercially fished species, further work, including off-pipeline surveys on the natural seafloor, are required to determine conclusively the ecological value of pipelines and thereby inform discussions regarding the ecological implications of pipeline decommissioning.

  12. Women of Hispanic Origin in the United States Labor Force. Facts on Working Women. Fact Sheet No. 85-11.

    Science.gov (United States)

    Department of Labor, Washington, DC.

    A four-page synposis of data on women of Hispanic origin in the labor force is presented. Data included are numbers of Hispanic women in the labor force; percentage of Hispanics among women in labor force; percentage of Hispanic women in the labor force; median ages; unemployment rate; education level; income levels; types of jobs occupied…

  13. Measuring excessive hours of work, low hourly pay, and informal employment through a labour force survey a pilot survey in the Philippines

    OpenAIRE

    Mehran, Farhad

    2005-01-01

    Using 2004 data of the Philippines' labour force survey, evaluates the hours of work at all jobs, hourly pay among time-rated wage and salary workers, informal employment etc., with the aim to quantify a decent-work situation (i.e. acceptable productive employment, social protection, social dialogue, and rights at work).

  14. Recent developments in pipeline welding practice

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Fourteen chapters are included: overview of pipeline welding systems and quality assurance, CRC automatic welding system, H.C. Price Co. automatic welding system, semi-automatic MIG-welding process, partial penetration welding of steel pipes for gas distribution, construction procedures and quality control in offshore pipeline construction, welding in repair and maintenance of gas transmission pipelines, British Gas studies of welding on pressurized gas transmission pipelines, hot tapping pipelines, underwater welding for offshore pipelines and associated equipment, radial friction welding, material composition vs weld properties, review of NDT of pipeline welds, and safety assurance in pipeline construction. A bibliography of approximately 150 references is included, arranged according to subject and year.

  15. Women of Hispanic Origin in the Labor Force. Facts on Working Women No. 89-1 = La mujer de origen hispano en la fuerza laboral. Facts on Working Women Num. 89-1S.

    Science.gov (United States)

    Women's Bureau (DOL), Washington, DC.

    Data on Hispanic women in the labor force between 1978 and 1988 show the following: (1) 6.5 percent of the women in the work force in 1988 were of Hispanic origin (3.6 million); (2) the median age of Hispanic women was 26.1 years, 2-5 years younger than Black or White women; (3) 66 percent of Hispanic women participate in the labor force, a higher…

  16. Using the direct current voltage gradient technology as a quality control tool during construction of new pipelines

    CSIR Research Space (South Africa)

    Masilela, Z

    1998-06-01

    Full Text Available pipelines. This technique is now increasingly gaining popularity as a good quality control tool when used on newly laid pipelines to detect coating damage, most of which could be attributed to construction work. On a recently built 50 km long gas pipeline...

  17. Optimizing the fMRI data-processing pipeline using prediction and reproducibility performance metrics: I. A preliminary group analysis

    DEFF Research Database (Denmark)

    Strother, Stephen C.; Conte, Stephen La; Hansen, Lars Kai

    2004-01-01

    We argue that published results demonstrate that new insights into human brain function may be obscured by poor and/or limited choices in the data-processing pipeline, and review the work on performance metrics for optimizing pipelines: prediction, reproducibility, and related empirical Receiver......, temporal detrending, and between-subject alignment) in a group analysis of BOLD-fMRI scans from 16 subjects performing a block-design, parametric-static-force task. Large-scale brain networks were detected using a multivariate linear discriminant analysis (canonical variates analysis, CVA) that was tuned...... of baseline scans have constant, equal means, and this assumption was assessed with prediction metrics. Higher-order polynomial warps compared to affine alignment had only a minor impact on the performance metrics. We found that both prediction and reproducibility metrics were required for optimizing...

  18. Stabilizing and retaining a quality nursing work force through the use of the Married State Preceptorship Model.

    Science.gov (United States)

    Figueroa, Solimar; Bulos, Marlene; Forges, Edwina; Judkins-Cohn, Tanya

    2013-08-01

    The nursing shortage requires new graduate registered nurses (RNs) to work at the bedside, often leading to a shortened orientation period and increased stress. In the Married State Preceptorship Model (MSPM), the preceptor and the preceptee work together as the new graduate RN transitions to the bedside while maintaining safety and quality. This study explored first-year turnover rates of new graduate RNs and new graduate RNs' and preceptors' perceptions of the MSPM in transitioning new graduate RNs to practice. Focus groups and surveys were used with 108 new graduate RNs and 100 preceptors. Four themes emerged for new graduate RNs: partnership, critical thinking, learning, and transition. A statistically significant decrease in turnover rates was seen with MSPM versus traditional precepting. Survey data found that new graduate RNs and preceptors perceived the MSPM as promoting safety and reducing anxiety. The MSPM allows organizations to retain a quality nursing work force focused on safety patient care by transitioning new graduate RNs into the practice setting. Copyright 2013, SLACK Incorporated.

  19. Maglev crude oil pipeline

    Science.gov (United States)

    Knolle, Ernst G.

    1994-01-01

    This maglev crude oil pipeline consists of two conduits guiding an endless stream of long containers. One conduit carries loaded containers and the other empty returns. The containers are levitated by permanent magnets in repulsion and propelled by stationary linear induction motors. The containers are linked to each other in a manner that allows them, while in continuous motion, to be folded into side by side position at loading and unloading points. This folding causes a speed reduction in proportion to the ratio of container diameter to container length. While in side by side position, containers are opened at their ends to be filled or emptied. Container size and speed are elected to produce a desired carrying capacity.

  20. Shipping Information Pipeline

    DEFF Research Database (Denmark)

    Jensen, Thomas

    to creating a more efficient shipping industry, and a number of critical issues are identified. These include that shipments depend on shipping information, that shipments often are delayed due to issues with documentation, that EDI messages account for only a minor part of the needed information......This thesis applies theoretical perspectives from the Information Systems (IS) research field to propose how Information Technology (IT) can improve containerized shipping. This question is addressed by developing a set of design principles for an information infrastructure for sharing shipping...... information named the Shipping Information Pipeline (SIP). Review of the literature revealed that IS research prescribed a set of meta-design principles, including digitalization and digital collaboration by implementation of Inter-Organizational Systems based on Electronic Data Interchange (EDI) messages...

  1. The Leaking Pipeline

    DEFF Research Database (Denmark)

    Henningsen, Inge; Højgaard, Lis

    2002-01-01

    negotiations of cultural prescriptions of gendered subjectivity and identities, organizational understandings and procedures embedded in specific university cultures, traditional of different science disciplines, and the systemic logic and political rationale of the education and research system....... these positions, and one that maintains that a closer look at the statistics does not support this optimism because women’s percentage in recruitment positions is not increasing as the pool of potential female researchers increases, or to put it metaphorically, “the pipeline is leaking women all along” (Alper...... it identifies and describes a Danish verion of ‘the leaky pipeline’ from analyses of the ratios of women in science from high school through tenured positions. Finally it illustrates the cultural mechanisms at play in this process, based on the results of three studies. The first two analyze the educational...

  2. Pipeline flow of heavy oil with temperature-dependent viscosity

    Energy Technology Data Exchange (ETDEWEB)

    Maza Quinones, Danmer; Carvalho, Marcio da Silveira [Pontifical Catholic University of Rio de Janeiro (PUC-Rio), RJ (Brazil). Dept. of Mechanical Engineering], E-mail: msc@puc-rio.br

    2010-07-01

    The heavy oil produced offshore needs to be transported through pipelines between different facilities. The pipelines are usually laid down on the seabed and are submitted to low temperatures. Although heavy oils usually present Newtonian behavior, its viscosity is a strong function of temperature. Therefore, the prediction of pressure drops along the pipelines should include the solution of the energy equation and the dependence of viscosity to temperature. In this work, an asymptotic model is developed to study this problem. The flow is considered laminar and the viscosity varies exponentially with temperature. The model includes one-dimensional equations for the temperature and pressure distribution along the pipeline at a prescribed flow rate. The solution of the coupled differential equation is obtained by second-order finite difference. Results show a nonlinear behavior as a result of coupled interaction between the velocity, temperature, and temperature dependent material properties. (author)

  3. Sustainability of social-environmental programs along pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Doebereiner, Christian [Shell Southern Cone Gas and Power (Brazil); Herrera, Brigitte [Transredes S.A. (Bolivia)

    2005-07-01

    The sustainability of Social and Environmental programs along pipelines, have shown to be a major challenge. Gas pipelines in Bolivia and Brazil operate in a diversity of environments and communities with different cultures, values and expectations. However, the pipeline network can also provide opportunities for contributing to regional development and working with local populations on topics of mutual interest. Many of these are quite strategic because they arise from topics of mutual interest for both the company and neighboring populations, and because they provide opportunities for achieving results of mutual benefit. These opportunities could include helping to make gas available to local communities, contributions to urban planning, hiring local services and other initiatives. Sustainable and integrated Social and Environmental programs are therefore key to a successful pipeline operation. These opportunities are often missed or under valued. Some successful examples are presented from Transredes S.A., Bolivia. (author)

  4. Wave Pipelining Using Self Reset Logic

    Directory of Open Access Journals (Sweden)

    Miguel E. Litvin

    2008-01-01

    Full Text Available This study presents a novel design approach combining wave pipelining and self reset logic, which provides an elegant solution at high-speed data throughput with significant savings in power and area as compared with other dynamic CMOS logic implementations. To overcome some limitations in SRL art, we employ a new SRL family, namely, dual-rail self reset logic with input disable (DRSRL-ID. These gates depict fairly constant timing parameters, specially the width of the output pulse, for varying fan-out and logic depth, helping accommodate process, supply voltage, and temperature variations (PVT. These properties simplify the implementation of wave pipelined circuits. General timing analysis is provided and compared with previous implementations. Results of circuit implementation are presented together with conclusions and future work.

  5. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  6. Labor Force

    Science.gov (United States)

    Occupational Outlook Quarterly, 2010

    2010-01-01

    The labor force is the number of people aged 16 or older who are either working or looking for work. It does not include active-duty military personnel or institutionalized people, such as prison inmates. Quantifying this total supply of labor is a way of determining how big the economy can get. Labor force participation rates vary significantly…

  7. Fishing intensity around the BBL pipeline

    NARCIS (Netherlands)

    Hintzen, Niels

    2016-01-01

    Wageningen Marine Research was requested by ACRB B.V. to investigate the fishing activities around the BBL pipeline. This gas pipeline crosses the southern North Sea from Balgzand (near Den Helder) in the Netherlands to Bacton in the UK (230km). This pipeline is abbreviated as the BBL pipeline. Part

  8. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-03-21

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting...

  9. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  10. Logistics aspects of petroleum pipeline operations

    Directory of Open Access Journals (Sweden)

    W. J. Pienaar

    2010-11-01

    Full Text Available The paper identifies, assesses and describes the logistics aspects of the commercial operation of petroleum pipelines. The nature of petroleum-product supply chains, in which pipelines play a role, is outlined and the types of petroleum pipeline systems are described. An outline is presented of the nature of the logistics activities of petroleum pipeline operations. The reasons for the cost efficiency of petroleum pipeline operations are given. The relative modal service effectiveness of petroleum pipeline transport, based on the most pertinent service performance measures, is offered. The segments in the petroleum-products supply chain where pipelines can play an efficient and effective role are identified.

  11. Failure Assessment for the High-Strength Pipelines with Constant-Depth Circumferential Surface Cracks

    OpenAIRE

    X. Liu; Z. X. Lu; Y. Chen; Y. L. Sui; L. H. Dai

    2018-01-01

    In the oil and gas transportation system over long distance, application of high-strength pipeline steels can efficiently reduce construction and operation cost by increasing operational pressure and reducing the pipe wall thickness. Failure assessment is an important issue in the design, construction, and maintenance of the pipelines. The small circumferential surface cracks with constant depth in the welded pipelines are of practical interest. This work provides an engineering estimation pr...

  12. Pipelines programming paradigms: Prefab plumbing

    International Nuclear Information System (INIS)

    Boeheim, C.

    1991-08-01

    Mastery of CMS Pipelines is a process of learning increasingly sophisticated tools and techniques that can be applied to your problem. This paper presents a compilation of techniques that can be used as a reference for solving similar problems

  13. Economic evaluation: wood stave pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Rook, M.E.

    The spray of leakage from the wood stave water supply pipeline serving the New England Power Company's (NEPCO) Searsburg hydroelectric development had caused this facility to be dubbed ''The Searsburg Car Wash.'' In July, 1982, excessive leakage from this pipeline prompted NEPCO to perform a technical inspection which would inform the company's decision to replace, repair, or abandon the pipeline. The inspection indicated that a combination of interrelated factors has led to rapid deterioration. The feasibility study, which included a benefit -cost analysis of a times replacement with a continued repair program weighed annually by a risk factor representing the probability of pipeline failure during the replacement period, determined that direct replacement was most advantageous. 4 figures, 1 figures.

  14. Analysis of the strength of sea gas pipelines of positive buoyancy conditioned by glaciation

    Science.gov (United States)

    Malkov, Venyamin; Kurbatova, Galina; Ermolaeva, Nadezhda; Malkova, Yulia; Petrukhin, Ruslan

    2018-05-01

    A technique for estimating the stress state of a gas pipeline laid along the seabed in northern latitudes in the presence of glaciation is proposed. It is assumed that the pipeline lies on the bottom of the seabed, but under certain conditions on the some part of the pipeline a glaciation is formed and the gas pipeline section in the place of glaciation can come off the ground due to the positive buoyancy of the ice. Calculation of additional stresses caused by bending of the pipeline is of practical interest for strength evaluation. The gas pipeline is a two-layer cylindrical shell of circular cross section. The inner layer is made of high-strength steel, the outer layer is made of reinforced ferroconcrete. The proposed methodology for calculating the gas pipeline for strength is based on the equations of the theory of shells. The procedure takes into account the effect of internal gas pressure, external pressure of sea water, the weight of two-layer gas pipeline and the weight of the ice layer. The lifting force created by the displaced fluid and the positive buoyancy of the ice is also taken into account. It is significant that the listed loads cause only two types of deformation of the gas pipeline: axisymmetric and antisymmetric. The interaction of the pipeline with the ground as an elastic foundation is not considered. The main objective of the research is to establish the fact of separation of part of the pipeline from the ground. The method of calculations of stresses and deformations occurring in a model sea gas pipeline is presented.

  15. Pipeline robots with elastic elements

    Directory of Open Access Journals (Sweden)

    A. Matuliauskas

    2002-10-01

    Full Text Available In the article constructions of the pipeline robots with elastic elements are reviewed and the scheme of new original construction is presented. The mathematical models of a robot with one-dimensional vibration exciter with two degrees of freedom were developed and the equations of movement were formed and written. The mathematical model of the pipeline robot with circular elements is formed and its motion equations are presented.

  16. Natural Gas pipelines: economics of incremental capacity

    International Nuclear Information System (INIS)

    Kimber, M.

    2000-01-01

    A number of gas transmission pipeline systems in Australia exhibit capacity constraints, and yet there is little evidence of creative or innovative processes from either the service provides of the regulators which might provide a market-based response to these constraints. There is no provision in the Code in its current form to allow it to accommodate these processes. This aspect is one of many that require review to make the Code work. It is unlikely that the current members of the National Gas Pipeline Advisory Committee (NGPAC) or its advisers have sufficient understanding of the analysis of risk and the consequential commercial drivers to implement the necessary changes. As a result, the Code will increasingly lose touch with the commercial realities of the energy market and will continue to inhibit investment in new and expanded infrastructure where market risk is present. The recent report prepared for the Business Council of Australia indicates a need to re-vitalise the energy reform process. It is important for the Australian energy industry to provide leadership and advice to governments to continue the process of reform, and, in particular, to amend the Code to make it more relevant. These amendments must include a mechanism by which price signals can be generated to provide timely and effective information for existing service providers or new entrants to install incremental pipeline capacity

  17. Black powder in gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sherik, Abdelmounam [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Despite its common occurrence in the gas industry, black powder is a problem that is not well understood across the industry, in terms of its chemical and physical properties, source, formation, prevention or management of its impacts. In order to prevent or effectively manage the impacts of black powder, it is essential to have knowledge of its chemical and physical properties, formation mechanisms and sources. The present paper is divided into three parts. The first part of this paper is a synopsis of published literature. The second part reviews the recent laboratory and field work conducted at Saudi Aramco Research and Development Center to determine the compositions, properties, sources and formation mechanisms of black powder in gas transmission systems. Microhardness, nano-indentation, X-ray Diffraction (XRD), X-ray Fluorescence (XRF) and Scanning Electron Microscopy (SEM) techniques were used to analyze a large number of black powder samples collected from the field. Our findings showed that black powder is generated inside pipelines due to internal corrosion and that the composition of black powder is dependent on the composition of transported gas. The final part presents a summary and brief discussion of various black powder management methods. (author)

  18. Optimal valve location in long oil pipelines

    OpenAIRE

    Grigoriev, A.; Grigorieva, N.V.

    2007-01-01

    We address the valve location problem, one of the basic problems in design of long oil pipelines. Whenever a pipeline is depressurized, the shutoff valves block the oil flow and seal the damaged part of the pipeline. Thus, the quantity of oil possibly contaminating the area around the pipeline is determined by the volume of the damaged section of the pipeline between two consecutive valves. Then, ecologic damage can be quantified by the amount of leaked oil and the environmental characteristi...

  19. A Note on an Analytic Solution for an Incompressible Fluid-Conveying Pipeline System

    Directory of Open Access Journals (Sweden)

    Vincent O. S. Olunloyo

    2017-01-01

    Full Text Available This paper presents an integral transform analytic solution to the equations governing a fluid-conveying pipeline segment where a gyroscopic or Coriolis force effect is taken into consideration. The mathematical model idealizes a segment of the pipeline as an elastic beam conveying an incompressible fluid. It is clearly shown that when such a system is supported at both ends and in a free motion, the Coriolis force dissipates no energy (or simply does not work as it generates conjugate complex vibratory components for all flow velocities. It is demonstrated that the modal natural frequencies can be computed from the algebraic products of the complex frequency pairs. Clearly, the patterns of the characteristics of the system’s natural frequencies are seen partly when the real and imaginary components are plotted, as widely seen in the literature. Nonetheless, results from this study revealed that a continuity profile exists to connect the subcritical, critical, and postcritical vibratory behaviours when the absolute values are plotted for any velocity. In the meantime, the efficacy and versatility of this method against the usual assumed spatial or temporal modal solutions are demonstrated by confirming the predictions and validity of results of earlier workers such as Paidoussis, Ziegler, and others where pre- and postdivergence behaviours are exhibited.

  20. Pipeline for Contraceptive Development

    Science.gov (United States)

    Blithe, Diana L.

    2016-01-01

    The high rates of unplanned pregnancy reflect unmet need for effective contraceptive methods for women, especially for individuals with health risks such as obesity, diabetes, hypertension, and other conditions that may contraindicate use of an estrogen-containing product. Improvements in safety, user convenience, acceptability and availability of products remain important goals of the contraceptive development program. Another important goal is to minimize the impact of the products on the environment. Development of new methods for male contraception has the potential to address many of these issues with regard to safety for women who have contraindications to effective contraceptive methods but want to protect against pregnancy. It also will address a huge unmet need for men who want to control their fertility. Products under development for men would not introduce eco-toxic hormones in the waste water. Investment in contraceptive research to identify new products for women has been limited in the pharmaceutical industry relative to investment in drug development for other indications. Pharmaceutical R&D for male contraception was active in the 1990’s but was abandoned over a decade ago. The Eunice Kennedy Shriver National Institute of Child Health and Human Development (NICHD) has supported a contraceptive development program since 1969. Through a variety of programs including research grants and contracts, NICHD has developed a pipeline of new targets/products for male and female contraception. A number of lead candidates are under evaluation in the NICHD Contraceptive Clinical Trials Network (CCTN) (1–3). PMID:27523300

  1. Bicycle: a bioinformatics pipeline to analyze bisulfite sequencing data.

    Science.gov (United States)

    Graña, Osvaldo; López-Fernández, Hugo; Fdez-Riverola, Florentino; González Pisano, David; Glez-Peña, Daniel

    2018-04-15

    High-throughput sequencing of bisulfite-converted DNA is a technique used to measure DNA methylation levels. Although a considerable number of computational pipelines have been developed to analyze such data, none of them tackles all the peculiarities of the analysis together, revealing limitations that can force the user to manually perform additional steps needed for a complete processing of the data. This article presents bicycle, an integrated, flexible analysis pipeline for bisulfite sequencing data. Bicycle analyzes whole genome bisulfite sequencing data, targeted bisulfite sequencing data and hydroxymethylation data. To show how bicycle overtakes other available pipelines, we compared them on a defined number of features that are summarized in a table. We also tested bicycle with both simulated and real datasets, to show its level of performance, and compared it to different state-of-the-art methylation analysis pipelines. Bicycle is publicly available under GNU LGPL v3.0 license at http://www.sing-group.org/bicycle. Users can also download a customized Ubuntu LiveCD including bicycle and other bisulfite sequencing data pipelines compared here. In addition, a docker image with bicycle and its dependencies, which allows a straightforward use of bicycle in any platform (e.g. Linux, OS X or Windows), is also available. ograna@cnio.es or dgpena@uvigo.es. Supplementary data are available at Bioinformatics online.

  2. Fatigue life assessment of free spanning pipelines containing corrosion defects

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Rita de Kassia D.; Campello, Georga C.; Matt, Cyntia G. da Costa; Benjamin, Adilson C.; Franciss, Ricardo [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas (CENPES)

    2009-12-19

    The free spanning pipelines assessment is a highlighted issue to be considered during the project and maintenance of the submarine pipelines. It is required to evaluate the fatigue life and the maximum stress due to VIV (Vortex Induced Vibration) as well as wave forces when applicable in case of shallow water. The code DNV-RP-F105 (2006) presents a methodology to calculate the fatigue life for free spanning pipelines. Such methodology however considers the pipe with no kind of defects. Nevertheless, sometimes corrosion defects are detected in periodic inspections and therefore their effects need to be taken into account in the fatigue life evaluation. The purpose of this paper thus is to present a procedure to assess the influence of the corrosion defects in the fatigue life of free spanning pipelines. Some FE analyses were performed to determine the stress concentrate factor (SCF) of the corrosion defects, which were used as input in the methodology presented in the code DNV-RP-F105 (2006). Curves of damage and so lifetime have been generated as function of the span length and water depth. As a practical application, this methodology was applied to a sub sea pipeline with several corrosion defects, localized in shallow water offshore Brazil. (author)

  3. Simulation of high consequence areas for gas pipelines

    Directory of Open Access Journals (Sweden)

    Orlando Díaz-Parra

    2018-01-01

    Full Text Available The gas pipeline is used for the transport of natural gas at a great distance. Risks derived from the handling of a combustible material transported under high pressure, by pipelines that pass close to where people live, makes it necessary to adopt prevention, mitigation and control measures to reduce the effect in case of ignition of a gas leak. This work shows the development of a new mathematical model to determine areas of high consequence and their application, using widely available and easy to use software, such as Google Earth and Excel, to determine and visualize the area up to which the level of radiation can affect the integrity of people and buildings. The model takes into account the pressure drop into the gas pipeline from the compression station, the gas leakage rate and possible forms of gas ignition. This development is an alternative to the use of specialized software and highly trained personnel. The simulation is applied to a traced of the Miraflores-Tunja gas pipeline, using a macro developed in Excel to determine the impact area and compare it with the coordinates of the vulnerable areas. The zones where these areas intersect are constituted in high consequence areas and are identified along with the sections of the pipeline that affect them, to provide the operator with a risk analysis tool for the determination and visualization of the gas pipeline and its environment.

  4. Pipeline coating inspection in Mexico applying surface electromagnetic technology

    Energy Technology Data Exchange (ETDEWEB)

    Delgado, O.; Mousatov, A.; Nakamura, E.; Villarreal, J.M. [Instituto Mexicano del Petroleo (IMP), Mexico City (Mexico); Shevnin, V. [Moscow State University (Russian Federation); Cano, B. [Petroleos Mexicanos (PEMEX), Mexico City (Mexico)

    2009-07-01

    The main problems in the pipeline systems in Mexico include: extremely aggressive soil characterized by a high clay content and low resistivity, interconnection between several pipes, including electrical contacts of active pipelines with out of service pipes, and short distances between pipes in comparison with their depths which reduce the resolution of coating inspection. The results presented in this work show the efficiency of the Surface Electromagnetic Pipeline Inspection (SEMPI) technology to determine the technical condition of pipelines in situations before mentioned. The SEMPI technology includes two stages: regional and detailed measurements. The regional stage consists of magnetic field measurements along the pipeline using large distances (10 - 100 m) between observation points to delimit zones with damaged coating. For quantitative assessing the leakage and coating resistances along pipeline, additional measurements of voltage and soil resistivity measurements are performed. The second stage includes detailed measurements of the electric field on the pipe intervals with anomalous technical conditions identified in the regional stage. Based on the distribution of the coating electric resistance and the subsoil resistivity values, the delimitation of the zones with different grade of coating quality and soil aggressiveness are performed. (author)

  5. Solving an unpiggable pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Walker, James R. [GE Oil and Gas, PII Pipeline Solutions, Cramlington Northumberland (United Kingdom); Kern, Michael [National Grid, New Hampshire (United Kingdom)

    2009-07-01

    Technically, any pipeline can be retrofitted to enable in line inspection. Sensibly however, the expense of excavations and construction of permanent facilities have been, in many cases, exceedingly prohibitive. Even where traditional modifications are feasible from engineering perspectives, flow interruption may not be an option - either because they are critical supply lines or because the associated lost revenues could be nearly insurmountable. Savvy pipeline integrity managers know the safety issue that is at stake over the long term. They are also well aware of the accuracy benefits that high-quality in-line inspection data offer over potentially supply disruptive alternatives such as hydrostatic testing. To complicate matters further, many operators, particularly in the US, now face regulatory pressure to assess the integrity of their yet-uninspected pipelines located in highly populated areas. This paper describes an important project National Grid undertook that made use of a unique pipeline access method that did not require permanent installation of expensive facilities required for in line inspection of a pipeline previously considered 'unpiggable'. Since the pipeline was located in an urban area, flow disruption had to be minimized. This paper will define the project background, its challenges, outcomes and lessons learned for the future. (author)

  6. The Kepler Science Operations Center Pipeline Framework Extensions

    Science.gov (United States)

    Klaus, Todd C.; Cote, Miles T.; McCauliff, Sean; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Chandrasekaran, Hema; Bryson, Stephen T.; Middour, Christopher; Caldwell, Douglas A.; hide

    2010-01-01

    The Kepler Science Operations Center (SOC) is responsible for several aspects of the Kepler Mission, including managing targets, generating on-board data compression tables, monitoring photometer health and status, processing the science data, and exporting the pipeline products to the mission archive. We describe how the generic pipeline framework software developed for Kepler is extended to achieve these goals, including pipeline configurations for processing science data and other support roles, and custom unit of work generators that control how the Kepler data are partitioned and distributed across the computing cluster. We describe the interface between the Java software that manages the retrieval and storage of the data for a given unit of work and the MATLAB algorithms that process these data. The data for each unit of work are packaged into a single file that contains everything needed by the science algorithms, allowing these files to be used to debug and evolve the algorithms offline.

  7. Independent Auditors Report on the Air Force Working Capital Fund FY 2015 and FY 2014 Basic Financial Statements for United States Air Force Agency Financial Report 2015

    Science.gov (United States)

    2015-11-09

    and character essential for leadership, and the motivation to serve as Air Force career officers. Each cadet graduates with a Bachelor of Science ...and specific national security requirement. RDT&E Major Programs ($ in millions) FY 15 Expenditure Science and Technology $2,282 Long Range Strike...1,243,894 (Less: Earned Revenue) Net Cost before Losses/(Gains) from Actuarial Assumption Changes for Military Retirement Benefits Net Program Costs

  8. Middle School Girls and the "Leaky Pipeline" to Leadership

    Science.gov (United States)

    Shapiro, Mary; Grossman, Diane; Carter, Suzanne; Martin, Karyn; Deyton, Patricia; Hammer, Diane

    2015-01-01

    Why do girls perform so well academically yet lose ground as professional women? This diminishing number of women up the leadership hierarchy is often referred to as the "leaky pipeline," and attributed to many factors: external ones such as work environments not conducive to work/life balance, and internal ones such as women's own…

  9. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Science.gov (United States)

    2011-05-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR 191... Reports AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Issuance of... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a final rule on November 26, 2010...

  10. 75 FR 45591 - Pipeline Safety: Notice of Technical Pipeline Safety Advisory Committee Meetings

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Committee Meetings AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  11. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    Directory of Open Access Journals (Sweden)

    Daniel J. Zimmerle

    2017-11-01

    Full Text Available Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH4/hr of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH4/hr [95 to 1065 kg CH4/hr, 95% CI], or 1% [0.2% to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA’s 2015 Greenhouse Inventory and study activity estimates. While EPA’s current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.

  12. Experimental and Numerical Investigation of Local Scour Around Submarine Piggyback Pipeline Under Steady Current

    Science.gov (United States)

    Zhao, Enjin; Shi, Bing; Qu, Ke; Dong, Wenbin; Zhang, Jing

    2018-04-01

    As a new type of submarine pipeline, the piggyback pipeline has been gradually adopted in engineering practice to enhance the performance and safety of submarine pipelines. However, limited simulation work and few experimental studies have been published on the scour around the piggyback pipeline under steady current. This study numerically and experimentally investigates the local scour of the piggyback pipe under steady current. The influence of prominent factors such as pipe diameter, inflow Reynolds number, and gap between the main and small pipes, on the maximum scour depth have been examined and discussed in detail. Furthermore, one formula to predict the maximum scour depth under the piggyback pipeline has been derived based on the theoretical analysis of scour equilibrium. The feasibility of the proposed formula has been effectively calibrated by both experimental data and numerical results. The findings drawn from this study are instructive in the future design and application of the piggyback pipeline.

  13. Design and Operation of the World's First Long Distance Bauxite Slurry Pipeline

    Science.gov (United States)

    Gandhi, Ramesh; Weston, Mike; Talavera, Maru; Brittes, Geraldo Pereira; Barbosa, Eder

    Mineracão Bauxita Paragominas (MBP) is the first long distance slurry pipeline transporting bauxite slurry. Bauxite had developed a reputation for being difficult to hydraulically transport using long distance pipelines. This myth has now been proven wrong. The 245-km- long, 13.5 MTPY capacity MBP pipeline was designed and commissioned by PSI for CVRD. The pipeline is located in the State of Para, Brazil. The Miltonia bauxite mine is in a remote location with no other efficient means of transport. The bauxite slurry is delivered to Alunorte Alumina refinery located near Barcarena. This first of its kind pipeline required significant development work in order to assure technical and economic feasibility. This paper describes the technical aspects of design of the pipeline. It also summarizes the operating experience gained during the first year of operation.

  14. Seismic damage estimation for buried pipelines - challenges after three decades of progress

    Energy Technology Data Exchange (ETDEWEB)

    Pineda-porras, Omar Andrey [Los Alamos National Laboratory; Najafi, Mohammand [U. OF TEXAS

    2009-01-01

    This paper analyzes the evolution over the past three decades of seismic damage estimation for buried pipelines and identifies some challenges for future research studies on the subject. The first section of this paper presents a chronological description of the evolution since the mid-1970s of pipeline fragility relations - the most common tool for pipeline damage estimation - and follows with a careful analysis of the use of several ground motion parameters as pipeline damage indicators. In the second section of the paper, four gaps on the subject are identified and proposed as challenges for future research studies. The main conclusion of this work is that enhanced fragility relations must be developed for improving pipeline damage estimation, which must consider relevant parameters that could influence the seismic response of pipelines.

  15. Experimental evaluation of ability of Relap5, Drako, Flowmaster2TM and program using unsteady wall friction model to calculate water hammer loadings on pipelines

    International Nuclear Information System (INIS)

    Marcinkiewicz, Jerzy; Adamowski, Adam; Lewandowski, Mariusz

    2008-01-01

    Mechanical loadings on pipe systems caused by water hammer (hydraulic transients) belong to the most important and most difficult to calculate design loadings in nuclear power plants. The most common procedure in Sweden is to calculate the water hammer loadings on pipe segments, according to the classical one-dimensional (1D) theory of liquid transient flow in a pipeline, and then transfer the results to strength analyses of pipeline structure. This procedure assumes that there is quasi-steady respond of the pipeline structure to pressure surges-no dynamic interaction between the fluid and the pipeline construction. The hydraulic loadings are calculated with 1D so-called 'network' programs. Commonly used in Sweden are Relap5, Drako and Flowmaster2-all using quasi-steady wall friction model. As a third party accredited inspection body Inspecta Nuclear AB reviews calculations of water hammer loadings. The presented work shall be seen as an attempt to illustrate ability of Relap5, Flowmaster2 and Drako programs to calculate the water hammer loadings. A special attention was paid to using of Relap5 for calculation of water hammer pressure surges and forces (including some aspects of influence of Courant number on the calculation results) and also the importance of considering the dynamic (or unsteady) friction models. The calculations are compared with experimental results. The experiments have been conducted at a test rig designed and constructed at the Szewalski Institute of Fluid Flow Machinery of the Polish Academy of Sciences (IMP PAN) in Gdansk, Poland. The analyses show quite small differences between pressures and forces calculated with Relap5, Flowmaster2 and Drako (the differences regard mainly damping of pressure waves). The comparison of calculated and measured pressures and also a force acting on a pre-defined pipe segment shows significant differences. It is shown that the differences can be reduced by using unsteady friction models in calculations

  16. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Science.gov (United States)

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Accidents AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. [[Page 45418

  17. Pipeline mapping and strain assessment using ILI (In-line Inspection) tolls

    Energy Technology Data Exchange (ETDEWEB)

    Purvis, Brian [GE PII Pipeline Solutions, Rio de Janeiro, RJ (Brazil); Huewener, Thomas [E.ON Ruhrgas AG, Essen (Germany)

    2009-07-01

    GE PII IMU Mapping inspection system measures pipeline location coordinates (x, y, z) and provides data for determining pipeline curvature and consequential pipeline bending strain. The changes in strain can be used in the application of structural analyses and integrity evaluation of pipeline systems. This paper reviews the Inertia Measuring Unit (IMU) system and field investigation works performed on a high-pressure gas pipeline for E.ON Ruhrgas AG. The Inertial Measuring Unit of the pipeline inspection tool provides continuous measurement of the pipeline centreline coordinates. More than one inspection run was performed which allowed a more accurate strain comparison to be made. Repeatability is important to establish the reasons for increasing strain values detected at specific pipeline sections through in-line inspection surveys conducted in regular intervals over many years. Moreover, the flexibility resulting from a combination of different sensor technologies, makes it possible to provide a more complete picture of the overall situation. This paper reviews the work involved in detecting, locating and determining the magnitude and type of strain corresponding to the pipeline movement in field. (author)

  18. Strain-based fracture assessment of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Olsoe, Erlend; Oestby, Erling; Nyhus, Baard [SINTEF, Trondheim (Norway); Skallerud, Bjoern; Holthe, Kjell [Norwegian University of Science and Technology (NTNU), Trondheim (Norway); Berg, Espen [LINKftr AS, Trondheim (Norway)

    2009-12-19

    The oil and gas industry moves into harsher regions and faces challenges with i.e. deep water, arctic conditions and seismic regions. Consequently, ensuring the integrity of pipelines becomes more challenging, and potential large deformation scenarios that can be attributed to the above mentioned areas have lead to a current strong focus on strain-based fracture assessment methods for pipelines. However, no widely established methods exist today. In this paper specific challenges related to development of such methods are discussed. Keywords are biaxial loading, crack driving force relations, ductile tearing resistance, and definition of strain capacity. The effect of the different features will be illustrated with both experimental and numerical simulation results. Experimental results presented will cover both large- and small-scale testing. A highly efficient and accurate line-spring based numerical fracture assessment method will be presented. A simplified scheme for a strain-based fracture assessment method will also be briefly outlined, and the extension of this method to also include partial safety factors is discussed. (author)

  19. Thermoplastic liners for carbon steel pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mehdi, Mauyed S.; AlDossary, Abdullah K. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Materials selection for pipe and fittings used to convey corrosive fluids has often been a challenge. Traditionally, exotic Corrosion Resistant Alloys (CRA) have been used in corrosive environments despite their high cost. Plastic lined carbon steel piping offers a cost effective alternative to the use of CRAs by eliminating corrosion, significantly reducing the use of toxic chemicals and the heavy metal usually present in CRAs. Thermoplastic Liners offer the combination of corrosion resistance and mechanical strength, which are unachievable with singular materials. Under pressure conditions, the liner is fully supported by the metalwork, while under vacuum conditions, the liner must be thick enough along with venting system to withstand the collapsing forces created by the negative pressure. Plastic liners have been used successfully to line and protect metallic pipelines for many years and have become an indispensable requirement of the oil and gas industry particularly with water injection and hydrocarbon services. In the case of internally corroded pipes, the use of thermoplastic liners for rehabilitation is an option to extend the lifetime of companies' assets, reduce maintenance cost and increase intervals between T and Is. For new construction, plastic liners in carbon steel pipes can compete technically and economically with pipelines of CRA materials and other corrosion inhibition systems. This paper describes various design features, installations of thermoplastic liners in comparison to other corrosion inhibition methods. (author)

  20. New territory for NGL pipelines

    International Nuclear Information System (INIS)

    Turner, C.L.; Billings, F.E.

    1994-01-01

    Even though the NGL pipeline industry appears mature, new geographic territory exists for expansion of NGL pipelines. However, the most fertile territory that must be pursued is the collective opportunities to better link the existing NGL industry. Associations like the Gas Processors Association can not perform the role demanded by a need to share information between the links of the chain on a more real time basis. The Association can not substitute for picking up the phone or calling a meeting of industry participants to discuss proposed changes in policies and procedures. All stakeholders must participate in squeezing out the inefficiencies of the industry. Some expansion and extension of NGL pipelines will occur in the future without ownership participation or commitments from the supply and demand businesses. However, significant expansions linking new supply sources and demand markets will only be made as the supply and demand businesses share long-term strategies and help define the pipeline opportunity. The successful industries of the twenty-first century will not be dominated by a single profitable sector, but rather by those industries which foster cooperation as well as competition. A healthy NGL industry will be comprised of profitable supply businesses and profitable demand businesses, linked together by profitable pipeline businesses

  1. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  2. Location class change impact on onshore gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Cassia de Oliveira; Oliveira, Luiz Fernando Seixas de [DNV Energy Solutions, Oslo (Norway); Leal, Cesar Antonio [DNV Energy Solutions, Porto Alegre, RS (Brazil); Faertes, Denise [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Gas and Energy

    2009-07-01

    During a pipeline life cycle, some significant changes in the population may happen along its route. Such changes are indirectly evaluated by the increase in the amount of buildings constructed along the route, which determines the so called Location Class. Such changes, after licensing, provoke differences between what is required by the standards and what is actually done. This work has two goals. One is to study the requirements of international standards and legislations as well as some solutions used in the United States, Canada, United Kingdom and Netherlands. This goal intends to provide some technical bases for a comparative analysis on how the location class changes, during the life cycle of a pipeline, are treated in each country. Another goal is to present a risk-based methodology for the guideline development which can be used in decision-making concerning what to do in case of any location class change. Particularly, it has given special attention to the requirements which are imposed for the pipeline operational license continuation. This work is of supreme importance for the Brazilian pipeline segment, since the existing Brazilian design standard, ABNT NBR12712 for transmission and distribution pipeline design, does not deal with that issue. Moreover, a summary of the main solutions found in those countries together with a guideline, customized for the Brazilian reality, is presented. (author)

  3. Development of leak-rupture criteria for axially through-wall cracked pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X.K.; Leis, B.N. [Battelle Memorial Inst., Columbus, OH (United States)

    2009-07-01

    In this study, J-integral based fracture mechanics were used to characterize the fracture behaviour of a pipeline from crack initiation and stable growth to tearing instability. The aim of the study was to develop an effective leak-rupture criterion for pipelines with axial through-wall cracks (TWC). The J driving force for cracked plates and pipes was estimated using a plastic influence function method. The EPRI estimation scheme and R6 method were used to obtain a general estimate of the J-integral of the pipe. The failure pressures of a TWC pipe at fracture initiation and instability were then modelled in order to define a leak-rupture boundary. Fracture initiation and instability analyses for the TWC pipeline were illustrated. Results of the study showed that the method can be used to improve the accuracy of J driving force estimation and the leak-rupture criterion for pipeline applications. 20 refs., 5 figs.

  4. Critical defect size assessment in pipelines on a nuclear power plant

    Directory of Open Access Journals (Sweden)

    Dimova Galya

    2018-01-01

    Full Text Available In many energy industry structures, pipeline systems are subject to the impact of mechanical forces, moments of forces and fluid flows of high pressure and temperature. These load factors cause defects in the pipeline metal. As the years of operation increase, defects may occur and grow, which may lead to the destruction of pipeline walls. Special measures have been planned and implemented to ensure the safe operation of high-energy facilities. This study focused on pipelines and nozzles of nuclear power plant equipment with bimetal welded joints on which the size of critical defects was assessed. The base of assessment covers material properties, temperature and stress fields, fracture mechanics calculations. This study involves developing of finite element models and implementing simulations on them in order to obtain temperature fields and determine the stress-strain state of the component.

  5. Frequency spectrum method-based stress analysis for oil pipelines in earthquake disaster areas.

    Directory of Open Access Journals (Sweden)

    Xiaonan Wu

    Full Text Available When a long distance oil pipeline crosses an earthquake disaster area, inertial force and strong ground motion can cause the pipeline stress to exceed the failure limit, resulting in bending and deformation failure. To date, researchers have performed limited safety analyses of oil pipelines in earthquake disaster areas that include stress analysis. Therefore, using the spectrum method and theory of one-dimensional beam units, CAESAR II is used to perform a dynamic earthquake analysis for an oil pipeline in the XX earthquake disaster area. This software is used to determine if the displacement and stress of the pipeline meet the standards when subjected to a strong earthquake. After performing the numerical analysis, the primary seismic action axial, longitudinal and horizontal displacement directions and the critical section of the pipeline can be located. Feasible project enhancement suggestions based on the analysis results are proposed. The designer is able to utilize this stress analysis method to perform an ultimate design for an oil pipeline in earthquake disaster areas; therefore, improving the safe operation of the pipeline.

  6. Frequency spectrum method-based stress analysis for oil pipelines in earthquake disaster areas.

    Science.gov (United States)

    Wu, Xiaonan; Lu, Hongfang; Huang, Kun; Wu, Shijuan; Qiao, Weibiao

    2015-01-01

    When a long distance oil pipeline crosses an earthquake disaster area, inertial force and strong ground motion can cause the pipeline stress to exceed the failure limit, resulting in bending and deformation failure. To date, researchers have performed limited safety analyses of oil pipelines in earthquake disaster areas that include stress analysis. Therefore, using the spectrum method and theory of one-dimensional beam units, CAESAR II is used to perform a dynamic earthquake analysis for an oil pipeline in the XX earthquake disaster area. This software is used to determine if the displacement and stress of the pipeline meet the standards when subjected to a strong earthquake. After performing the numerical analysis, the primary seismic action axial, longitudinal and horizontal displacement directions and the critical section of the pipeline can be located. Feasible project enhancement suggestions based on the analysis results are proposed. The designer is able to utilize this stress analysis method to perform an ultimate design for an oil pipeline in earthquake disaster areas; therefore, improving the safe operation of the pipeline.

  7. Sectional pipeline bundles. Design, fabrication and testing of a subsea pipeline connection system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    The tests of the prototype system indicated that the system is applicable for connecting pipeline bundle sections. The overall performance of the system is therefore concluded to be satisfactory. Some modifications are required though, for improving the reliability of the system to the level required for offshore North Sea application. The tests showed that connection of the pipeline bundle sections can be performed for alignment tolerances larger than those expected during a typical subsea installation. Pull-in of bundle end sections can be performed with pull-in wires deployed from surface. The offshore tests showed that handling of wires must be done with great care to avoid possibility for wire entanglement, especially if a fully diverless system is to be used. The flowline connection tool was found to be suitable for final alignment of the individual spool ends. It was demonstrated that face to face contact between the hub faces in the connector was obtained after tie-in. Pressure tests showed that the connector could be sealed by the tie-in force applied by the connection tool tie-in system. However, the standard connector clamp which was used, was found to be insuficient for maintaining the connector effectively sealed after removal of the pull-in force applied by the connection tool. Based on the results proposals for improvements of the system are included. Improvements are applicable to the current system for connection of bundle sections or for tie-in operations, relating to conventional pipelines. The improvements also includes a strong connection clamp suitable for subsea use. The connection clamp will replace the standard clamp devise used in this project. (au) EFP-96. 41 refs.

  8. Different forces

    CERN Multimedia

    1982-01-01

    The different forces, together with a pictorial analogy of how the exchange of particles works. The table lists the relative strength of the couplings, the quanta associated with the force fields and the bodies or phenomena in which they have a dominant role.

  9. Jockeying for position : how the proposed pipeline projects and route-on-route competition are shaping up in the Arctic

    International Nuclear Information System (INIS)

    Andre, H.

    2003-01-01

    This presentation included a brief historical look at pipeline proposals submitted over the years to bring Alaska and Northwest Territories gas to market. The challenges facing the early proponents of a pipeline from Prudhoe Bay to the Mackenzie Delta, such as cost, environmental impact and socio-economic impact on Aboriginals living in the Mackenzie Valley, have now been removed. Lobbying efforts by politicians in Alaska nearly succeeded in forcing an Alaska Highway gas pipeline, instead of letting market economics dictate the route. The author indicated that an Alaska pipeline would not benefit the Canadian natural gas industry, rather it would force production from the Western Canada Sedimentary Basin (WCSB) to be slashed, resulting in reduced drilling and lower royalties to government. The author suggested that Canada should not grant any permit to construct a pipeline in Canada that is destined for markets in the contiguous United States if the pipeline was in any way subsidized to disadvantage Canadian producers. The author explained why the proposal to build a standalone pipeline in the Mackenzie Valley before the Alaska Highway pipeline is not a good idea. Gas prices and pipeline tolls are the most important economic elements. The author expressed the opinion that the over the top route combined with the Mackenzie Valley route would be beneficial to both Canada and the United States for a host of reasons. figs

  10. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  11. Technical consideration of Niigata-Sendai natural gas pipeline; Niigata Sendaikan tennen gas pipeline no seko to gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Tsujimura, O.; Sugai, H.; Koizumi, H. [Kawasaki Steel Corp., Tokyo (Japan)

    1997-09-01

    The Niigata-Sendai natural gas pipeline was constructed in 1996 by Japan Petroleum Exploration Co. to transmit indigenous gas produced off Niigata Pref. and imported gas from Indonesia in the form of LNG to Tohoku Electric Power Co.`s Sendai Thermal Power Station. It is the second longest onshore pipeline in Japan extending 251km (nominal diameter: 20in.). Kawasaki Steel participated in the construction project from the preliminary investigation and planning stage, and constructed a 97km long section, which is approximately 39% of the total length. Various new techniques were applied to secure safety and reduce cost. This paper outlines the project and some of the representative techniques adopted for the project, such as field bends cold-worked on 11m long straight pipes, work management system for constructing long-distance pipelines, coordination for the test runs and verification of the designs. 3 refs., 12 figs., 5 tabs.

  12. Defense Finance and Accounting Service Work on the FY 1993 Air Force Defense Business Operations Fund Financial Statements

    National Research Council Canada - National Science Library

    Rau, Russell

    1995-01-01

    Our original audit objective was to determine whether the Air Force Consolidated Defense Business Operations Fund financial statements, prepared by the DFAS Denver Center for FY 1993, were presented...

  13. Update on the SDSS-III MARVELS data pipeline development

    Science.gov (United States)

    Li, Rui; Ge, J.; Thomas, N. B.; Petersen, E.; Wang, J.; Ma, B.; Sithajan, S.; Shi, J.; Ouyang, Y.; Chen, Y.

    2014-01-01

    MARVELS (Multi-object APO Radial Velocity Exoplanet Large-area Survey), as one of the four surveys in the SDSS-III program, has monitored over 3,300 stars during 2008-2012, with each being visited an average of 26 times over a 2-year window. Although the early data pipeline was able to detect over 20 brown dwarf candidates and several hundreds of binaries, no giant planet candidates have been reliably identified due to its large systematic errors. Learning from past data pipeline lessons, we re-designed the entire pipeline to handle various types of systematic effects caused by the instrument (such as trace, slant, distortion, drifts and dispersion) and observation condition changes (such as illumination profile and continuum). We also introduced several advanced methods to precisely extract the RV signals. To date, we have achieved a long term RMS RV measurement error of 14 m/s for HIP-14810 (one of our reference stars) after removal of the known planet signal based on previous HIRES RV measurement. This new 1-D data pipeline has been used to robustly identify four giant planet candidates within the small fraction of the survey data that has been processed (Thomas et al. this meeting). The team is currently working hard to optimize the pipeline, especially the 2-D interference-fringe RV extraction, where early results show a 1.5 times improvement over the 1-D data pipeline. We are quickly approaching the survey baseline performance requirement of 10-35 m/s RMS for 8-12 solar type stars. With this fine-tuned pipeline and the soon to be processed plates of data, we expect to discover many more giant planet candidates and make a large statistical impact to the exoplanet study.

  14. Training and Educating the Work Force in the Nineties: The Rationale for Public/Private Collaboration. Public/Private Ventures. Information Series No. 331.

    Science.gov (United States)

    Smith, Thomas J.; Trist, Carolyn

    The need for partnerships among deliverers of training in the public and private sectors has reached a critical point if U.S. businesses are to remain competitive. The work force and workplace are being transformed by demographic trends, economic and employment trends, a growing skills mismatch, and concerns over educational effectiveness. Two…

  15. Rheumatic patients at work : a study of labour force participations and its determinants in rheumatoid arthritis, ankylosing spondylitis, and juvenile chronic arthritis

    NARCIS (Netherlands)

    Chorus, A.M.J.

    2004-01-01

    This thesis at the University of Maastricht, defended at May 7, 2004, yields several important and new findings with regard to work related quality of life, participation in the labour force and its determinants of patients with rheumatoid arthritis (RA), ankylosing spondylitis (AS) and juvenile

  16. Effects of requested, forced and denied shift schedule change on work ability and health of nurses in Europe -results from the European NEXT-Study.

    Science.gov (United States)

    Galatsch, Michael; Li, Jian; Derycke, Hanne; Müller, Bernd Hans; Hasselhorn, Hans Martin

    2013-12-05

    Previous cross-sectional findings from the European Nurses Early Exit Study (NEXT) show that nurses who were dissatisfied with their work schedule tended to consider leaving the nursing profession. Mediating factors in this decision process may be caused by self-perceived poor work ability and/or health. The aim of this paper is to investigate changes in work ability and general health among nurses in relation to requested, forced and denied change of shift schedule. Longitudinal data from the NEXT Study was used. In total 11,102 nurses from Belgium, Germany, Finland, the Netherlands, Poland, Slovakia, France and Italy completed both the 'basic questionnaire' (t1) and the '12 month follow-up questionnaire' (t2). To examine the time-effect (repeated measures) and the group-effect of five defined groups of nurses on the Work Ability Index (WAI) and general health (SF36), an adjusted 2-way analysis of covariance (ANCOVA) was performed. The nurses who wanted to, but could not change their shifts during the 12 month follow-up had the lowest initial and follow-up scores for WAI (t1: 37.6, t2: 36.6, p work ability and to a lesser comparatively low extent with increased decline in health scores. A forced change of shift against the nurses' will was significantly associated with a deteriorating work ability and health. The findings would suggest that nurses' desire to change their shift patterns may be an indicator for perceived low work ability and/or low health. The results also indicate that fulfilling nurses' wishes with respect to their shift work pattern may improve their personal resources such as work ability and - to somewhat lesser extent - health. Disregarding nurses' preferences, however, bears the risk for further resource deterioration. The findings imply that shift schedule organization may constitute a valuable preventive tool to promote nurses' work ability and - to lesser extent - their perceived health, not least in aging nursing work forces.

  17. Special signalizing of the Grande River crossing with the OSBRA pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Adriano C.; Luz, Marcelo Pedroso da; Castro, Newton C. de; Spagnolo, Rodrigo A. [TRANSPETRO, Rio de Janeiro, RJ (Brazil); Silva Junior, Fernando C. Carneiro da [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the experience acquired by PETROBRAS Transporte S.A., TRANSPETRO, signaling the crossing of Sao Paulo - Brasilia Pipeline, OSBRA, with the Grande River, important brazilian river that has in this cross section 400 m in width and 10 m of average depth. In sub aquatic inspections carried through by divers to confirm the pipeline's silting condition, evidences of basin format dredging near the pipeline have been identified and, even though it was not sufficient to expose de pipeline, has reduced its covering significantly. This site is an important area of sand extraction, and although the intense works of awareness of local dredging companies to not operate in the pipeline area, TRANSPETRO was surprised by the evidences. In testimonials, local dredge operators complained about difficulties in identifying the pipeline position in nightly operations. Expecting to improve the operational security in the pipeline crossing, a joint project was developed by TRANSPETRO, Brazilian Navy and the dredging companies, with the intention to signal safe area around the submerged pipeline, avoiding dredge operations with the installation of polyethylene floating buoys equipped with night signaling kits and fixed by concrete anchors. Although it was technically simple, the unprecedented proposal in Brazil increased safety in the pipeline operations and made them much safer for the local population and for the environment, in one of the biggest water resources of the Southeastern region of Brazil. (author)

  18. Research on weld cracking of TP321H stainless steel pipeline under elevated temperature

    International Nuclear Information System (INIS)

    Pan, Jian-hua; Fan, Zhi-cao; Zong, Ning-sheng

    2016-01-01

    The failure of pipeline which adopted material type TP321H austenitic stainless steel and occurred cracking after servicing at elevated temperature for less than two years had been investigated. The cracks were appeared repeatedly although they had been repaired for several times. The pipeline stress analysis was conducted to determine stress levels of cracking positions by finite element analysis software ABAQUS. The mechanical properties of base metals and welds including tensile and charpy impact tests were carried out. The test results showed that ductility of welds cut from the serviced pipeline was very poor. The microstructure investigations suggested that it was intergranular crack located in the HAZ near fusion line. It could be determined that it was reheat cracking based on some other works such as metallographic inspection, SEM, X-ray diffraction, etc. Welds analysis results showed that the welding of pipeline had not been in accord with right qualification of welding procedure leading to poor welding quality. The cracking reasons and preventive measures were discussed. Several suggestions were proposed to help extend service lifetime of the stainless steel pipeline under elevated temperature condition. - Highlights: • The pipeline is calculated by finite element analysis software ABAQUS. • Various tests are made, such as mechanical property, SEM, EDS, X-ray diffraction. • It is reheat cracking or stress relief cracking for the pipeline failure. • The stress levels of pipeline should be as low as possible. • The lifetime of pipeline would be shorten obviously due to poor weld quality.

  19. 77 FR 51848 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-27

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Program for Gas Distribution Pipelines. DATES: Interested persons are invited to submit comments on or.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and...

  20. 78 FR 5866 - Pipeline Safety: Annual Reports and Validation

    Science.gov (United States)

    2013-01-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0319] Pipeline Safety: Annual Reports and Validation AGENCY: Pipeline and Hazardous Materials... 2012 gas transmission and gathering annual reports, remind pipeline owners and operators to validate...

  1. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  2. 77 FR 27279 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-05-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  3. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  4. 75 FR 53733 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-09-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0246] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous... liquefied natural gas, hazardous liquid, and gas transmission pipeline systems operated by a company. The...

  5. 77 FR 46155 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  6. 77 FR 15453 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... information collection titled, ``Gas Pipeline Safety Program Certification and Hazardous Liquid Pipeline... collection request that PHMSA will be submitting to OMB for renewal titled, ``Gas Pipeline Safety Program...

  7. pipelines cathodic protection design methodologies for impressed

    African Journals Online (AJOL)

    HOD

    oil and gas pipelines corrosion in the United State of. American alone ... or preventing external corrosion of pipeline steels and other metallic .... 2.1 Materials and Impressed Current Design. Carbon steel ..... Research Analysis, Vol. 2, pp 2277 ...

  8. Natural disasters and the gas pipeline system.

    Science.gov (United States)

    1996-11-01

    Episodic descriptions are provided of the effects of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the Cit of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas' pipeline...

  9. The challenges of working values of SEH (Safety, Environment and Health) in the construction of Urucu / Manaus Gas Pipeline in the Amazon rain forest; Os desafios de trabalhar os valores de SMS (Seguranca, Meio ambiente e Saude) na construcao do Gasoduto Urucu/Manaus na Floresta Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Mendes, Jeane Ramos; Rocha, Katia Rosilene Soares da; Paredio, Lindoneide Lima [Concremat Engenharia e Tecnologia, Rio de Janeiro, RJ (Brazil); Pellin, Madson Weider Elgaly [JPTE Engenharia, Sao Jose dos Campos, SP (Brazil); Barreto, Jean Luis Campos [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work, aims to sharpen the main difficulties of acting in SMS and the corrective and preventive measures in the work of the pipeline Urucu / Manaus, located in the influence of the Solimoes River, covering several municipalities in the state of Amazonas (Coari, Codajas, Caapiranga, Anama, Iranduba, Manaus). Such pipeline has three spread, namely Spread A, from Urucu to Coari, Spread B1, from Coari to Anama, and Spread B2, from Anama to Manaus. For the purpose of the present case, we have focused on the Spread B2, from the city of Anama to Manaus, from km 475 to Km 662, being 174,400 m long. Its main line ends right within the premises of the Refinaria Isaac Sabba (a local refinery), which is located at Rua Rio Quixito - Distrito Industrial. The purpose of the pipeline is to convey natural gas to the Pressure Regulating Station, which is located close by the aforementioned refinery. The gas is transported to Maua Thermoelectrical, to generate energy for certain areas of the Amazon capital city. The information has been obtained through observations made on the difficulties faced by the workers to comply with safety behaviour while carrying out their activities. Also, by using several tools, such us Auditoria Comportamental (Behaviour Auditing) - Audicomp, Aplicacao de Listas de Verificacao - LV's (Verification Lists), as well as Indice de Praticas Seguras - IPS (Safety Practices Index). The collected data is analysed, and displayed in graphics, tables and processed in PETROBRAS internal systems, such Audicomp (Behaviour Auditing), SALV (Verification Lists Application System), and Auditoria de IPS (Safety Practices Index Auditing). The main difficulties to implement SMS (Safety, Environment and Health) in a pipeline works in the Amazon require from the transportation logistics, communication problems, lack of enough local skilled labor, the adverse region's season conditions, both flood and dry seasons, as well as to commit the local population with

  10. 75 FR 63774 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-10-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of... Gas Pipeline Safety Act of 1968, Public Law 90-481, delegated to DOT the authority to develop...

  11. 77 FR 61825 - Pipeline Safety: Notice of Public Meeting on Pipeline Data

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... program performance measures for gas distribution, gas transmission, and hazardous liquids pipelines. The... distribution pipelines (49 CFR 192.1007(e)), gas transmission pipelines (49 CFR 192.945) and hazardous liquids...

  12. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  13. Modeling flows of heterogeneous media in pipelines when substantiating operating conditions of hydrocarbon field transportation systems

    Science.gov (United States)

    Dudin, S. M.; Novitskiy, D. V.

    2018-05-01

    The works of researchers at VNIIgaz, Giprovostokneft, Kuibyshev NIINP, Grozny Petroleum Institute, etc., are devoted to modeling heterogeneous medium flows in pipelines under laboratory conditions. In objective consideration, the empirical relationships obtained and the calculation procedures for pipelines transporting multiphase products are a bank of experimental data on the problem of pipeline transportation of multiphase systems. Based on the analysis of the published works, the main design requirements for experimental installations designed to study the flow regimes of gas-liquid flows in pipelines were formulated, which were taken into account by the authors when creating the experimental stand. The article describes the results of experimental studies of the flow regimes of a gas-liquid mixture in a pipeline, and also gives a methodological description of the experimental installation. Also the article describes the software of the experimental scientific and educational stand developed with the participation of the authors.

  14. Report of the Task Force for Improved Coordination of the DoD Science and Technology Program. Volume 2. Reports of the Working Groups. Working Group A: Strategic Planning. Working Group B: Program Coordination. Working Group C: Advocacy

    Science.gov (United States)

    1988-08-01

    OperabllY 19 Technolofy Area Summaries 20 Major Technology Thrws 21 Air Force S&T Investment Summary 25 Program Objectives 28 Glcazy 30 1. D-6 TH~E...8217lRI-TAC Advrane Plannzn Sy-i Mulima Radio AWAM3 IRP JSTARS fris MmAvne Anhn ABOCC 37=6 Comb !dftica~ S~ Surance Radar Ewm EAVZ SYNC Media . R~u... Social Sciences 5001 Eisenhower Avenue Alexandria VA 22333-5600 Col. Harry G. Dangerfield Telephone: (301) 663-7443 Executive Assistant to the PEO for

  15. Use of pipe saks on pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Ghio, Alberto F.M.; Caciatori, Angelo [Galvao Engenharia S.A., Sao Paulo, SP (Brazil); Ruschi, Allan A.; Santos, Felipe A. dos; Barros, Horacio B. de; Loureiro, Regis R. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The use of new technologies applied to pipeline construction and assembling, aimed at enhancing productivity has been searched by PETROBRAS, throughout its subcontractors, assemblers, by transference in the mentioned constructions. Along the construction of Cacimbas Catu Pipeline, Spread 1 A, placed between the Cacimbas Gas Treatment Station (Linhares, ES) and the future Compression Station of Sao Mateus (ES), one, by means of surveys, noticed that the length of flooded or prone to flooding areas was way superior to the ones foreseen in the basic design. One of the broadly used methods for assuring buoyancy control is concreting the pipes. Such method deeply impacts work's logistics in for instance, the pipe stringing work; in this one, a maximum load of two pipes can be transported until the area to applied, what leads to lower productivity and higher risk due to the increase of trips by heavy load trucks. As an alternative to regular concrete, the Pipe Sak System was adopted and such method improved productivity and decreased discontinuities. (author)

  16. Nine Years of XMM-Newton Pipeline: Experience and Feedback

    Science.gov (United States)

    Michel, Laurent; Motch, Christian

    2009-05-01

    The Strasbourg Astronomical Observatory is member of the Survey Science Centre (SSC) of the XMM-Newton satellite. Among other responsibilities, we provide a database access to the 2XMMi catalogue and run the part of the data processing pipeline performing the cross-correlation of EPIC sources with archival catalogs. These tasks were all developed in Strasbourg. Pipeline processing is flawlessly in operation since 1999. We describe here the work load and infrastructure setup in Strasbourg to support SSC activities. Our nine year long SSC experience could be used in the framework of the Simbol-X ground segment.

  17. Nine Years of XMM-Newton Pipeline: Experience and Feedback

    International Nuclear Information System (INIS)

    Michel, Laurent; Motch, Christian

    2009-01-01

    The Strasbourg Astronomical Observatory is member of the Survey Science Centre (SSC) of the XMM-Newton satellite. Among other responsibilities, we provide a database access to the 2XMMi catalogue and run the part of the data processing pipeline performing the cross-correlation of EPIC sources with archival catalogs. These tasks were all developed in Strasbourg. Pipeline processing is flawlessly in operation since 1999. We describe here the work load and infrastructure setup in Strasbourg to support SSC activities. Our nine year long SSC experience could be used in the framework of the Simbol-X ground segment.

  18. Isolation of nuclear coolant pipelines by formation of ice plug

    International Nuclear Information System (INIS)

    Khanijo, R.N.; Sankar, S.

    1989-01-01

    In heavy-water reactors it is a common practice to use freeze seal technique towards isolation of pipe-line sections from the main system for maintenance work or for system modifications. Adoption of the freeze seal technique with innovative changes to suit the system and site conditions is presented for two particular cases encountered in Indian research reactors. (author)

  19. Fishing activity near offshore pipelines, 2017

    NARCIS (Netherlands)

    Machiels, Marcel

    2018-01-01

    On the North Sea bottom lie numerous pipelines to link oil- or gas offshore drilling units, - platforms and processing stations on land. Although pipeline tubes are coated and covered with protective layers, the pipelines risk being damaged through man-made hazards like anchor dropping and fishing

  20. Elasticplastic dynamic analysis of pipelines

    International Nuclear Information System (INIS)

    Veloso Filho, D.; Loula, A.F.D.; Guerreiro, J.N.C.

    1982-01-01

    A model for structural analysis of spatial pipelines constituted by material with perfect elastoplastic behavior and submmited to time dependence stress is presented. The spatial discretization is done using the Finite Element method, and for the time integration of movement equations an stable finite difference algorithm is used. (E.G.) [pt

  1. Long term pipeline monitoring in geomechanically sensitive environments

    Energy Technology Data Exchange (ETDEWEB)

    Weir-Jones, I.; Sun, M. [Weir-Jones Engineering Consultants Ltd. (Canada)

    2011-07-01

    In the oil industry, monitoring pipeline structural integrity is necessary for both regulatory and environmental purposes. Weir-Jones Engineering Consultants developed an automated structural integrity monitoring (SIM) system, data on strain, displacement and temperature are continuously acquired and automatically transmitted to the monitoring personnel. The aim of this paper is to present this technology and its implementation on one of Inter Pipeline Fund's lines as well. The automated SIM equipment was installed on a new 42'' line at the crossing of the Clearwater River close to Fort McMurray. Results showed that this technology is a good way to monitor pipelines in remote locations, environmentally sensitive areas, river and embankment crossings and in locations where external forces can put the pipeline at risk; but it should not be used otherwise as that would not be cost effective. This paper described the developed automated SIM and showed that it should only be used in specific locations to be cost effective.

  2. Customer service drives pipelines' reorganization

    International Nuclear Information System (INIS)

    Share, J.

    1997-01-01

    The concept behind formation of Enron Transportation and Storage tells plenty about this new gas industry. When executives at the Enron Gas Pipeline Group considered plans last year to streamline operations by merging the support functions of Transwestern Pipeline and their other wholly owned pipeline company, Northern Natural Gas, seamless customer service was foremost on their agenda. Instead of worrying about whether employees would favor one pipeline over the other, perhaps to the detriment of customers, they simply created a new organization that everyone would swear the same allegiance to. The 17,000-mile, 4.1 Bcf/d Northern system serves the upper Midwest market and two major expansion projects were completed there last year. Transwestern is a 2,700-mile system with an eastward capacity of 1 Bcf/d and westward of 1.5 Bcf/, that traditionally served California markets. It also ties into Texas intrastate markets and, thanks to expansion of the San Juan lateral, to southern Rocky Mountain supplies. Although Enron Corp. continues to position itself as a full-service energy company, the Gas Pipeline Group continues to fuel much of corporate's net income, which was $584 million last year. With ET and S comprising a significant portion of GPG's income, it was vital that the merger of Northern's 950 employees with Transwestern's 250 indeed be a seamless one. It was not easy either psychologically or geographically with main offices in Omaha, NE and Houston as well as operations centers in Minneapolis, MN; Amarillo, TX; W. Des Moines, IA; and Albuquerque, NM. But the results have been gratifying, according to William R. Cordes, President of ET and S and Nancy L. Gardner, Executive Vice President of Strategic Initiatives

  3. Methodology for risk assessment and reliability applied for pipeline engineering design and industrial valves operation

    Energy Technology Data Exchange (ETDEWEB)

    Silveira, Dierci [Universidade Federal Fluminense (UFF), Volta Redonda, RJ (Brazil). Escola de Engenharia Industrial e Metalurgia. Lab. de Sistemas de Producao e Petroleo e Gas], e-mail: dsilveira@metal.eeimvr.uff.br; Batista, Fabiano [CICERO, Rio das Ostras, RJ (Brazil)

    2009-07-01

    Two kinds of situations may be distinguished for estimating the operating reliability when maneuvering industrial valves and the probability of undesired events in pipelines and industrial plants: situations in which the risk is identified in repetitive cycles of operations and situations in which there is a permanent hazard due to project configurations introduced by decisions during the engineering design definition stage. The estimation of reliability based on the influence of design options requires the choice of a numerical index, which may include a composite of human operating parameters based on biomechanics and ergonomics data. We first consider the design conditions under which the plant or pipeline operator reliability concepts can be applied when operating industrial valves, and then describe in details the ergonomics and biomechanics risks that would lend itself to engineering design database development and human reliability modeling and assessment. This engineering design database development and reliability modeling is based on a group of engineering design and biomechanics parameters likely to lead to over-exertion forces and working postures, which are themselves associated with the functioning of a particular plant or pipeline. This approach to construct based on ergonomics and biomechanics for a more common industrial valve positioning in the plant layout is proposed through the development of a methodology to assess physical efforts and operator reach, combining various elementary operations situations. These procedures can be combined with the genetic algorithm modeling and four elements of the man-machine systems: the individual, the task, the machinery and the environment. The proposed methodology should be viewed not as competing to traditional reliability and risk assessment bur rather as complementary, since it provides parameters related to physical efforts values for valves operation and workspace design and usability. (author)

  4. Basic overview towards the assessment of landslide and subsidence risks along a geothermal pipeline network

    Science.gov (United States)

    Astisiasari; Van Westen, Cees; Jetten, Victor; van der Meer, Freek; Rahmawati Hizbaron, Dyah

    2017-12-01

    An operating geothermal power plant consists of installation units that work systematically in a network. The pipeline network connects various engineering structures, e.g. well pads, separator, scrubber, and power station, in the process of transferring geothermal fluids to generate electricity. Besides, a pipeline infrastructure also delivers the brine back to earth, through the injection well-pads. Despite of its important functions, a geothermal pipeline may bear a threat to its vicinity through a pipeline failure. The pipeline can be impacted by perilous events like landslides, earthquakes, and subsidence. The pipeline failure itself may relate to physical deterioration over time, e.g. due to corrosion and fatigue. The geothermal reservoirs are usually located in mountainous areas that are associated with steep slopes, complex geology, and weathered soil. Geothermal areas record a noteworthy number of disasters, especially due to landslide and subsidence. Therefore, a proper multi-risk assessment along the geothermal pipeline is required, particularly for these two types of hazard. This is also to mention that the impact on human fatality and injury is not presently discussed here. This paper aims to give a basic overview on the existing approaches for the assessment of multi-risk assessment along geothermal pipelines. It delivers basic principles on the analysis of risks and its contributing variables, in order to model the loss consequences. By considering the loss consequences, as well as the alternatives for mitigation measures, the environmental safety in geothermal working area could be enforced.

  5. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  6. Renewing the Principal Pipeline

    Science.gov (United States)

    Turnbull, Brenda J.

    2015-01-01

    The work principals do has always mattered, but as the demands of the job increase, it matters even more. Perhaps once they could maintain safety and order and call it a day, but no longer. Successful principals today must also lead instruction and nurture a productive learning community for students, teachers, and staff. They set the tone for the…

  7. Dynamic Transmission Modeling : A Report of the ISPOR-SMDM Modeling Good Research Practices Task Force Working Group-5

    NARCIS (Netherlands)

    Pitman, Richard; Fisman, David; Zaric, Gregory S.; Postma, Maarten; Kretzschmar, Mirjam; Edmunds, John; Brisson, Marc

    2012-01-01

    The transmissible nature of communicable diseases is what sets them apart from other diseases modeled by health economists. The probability of a susceptible individual becoming infected at any one point in time (the force of infection) is related to the number of infectious individuals in the

  8. Concept of an advanced hyperspectral remote sensing system for pipeline monitoring

    Science.gov (United States)

    Keskin, Göksu; Teutsch, Caroline D.; Lenz, Andreas; Middelmann, Wolfgang

    2015-10-01

    Areas occupied by oil pipelines and storage facilities are prone to severe contamination due to leaks caused by natural forces, poor maintenance or third parties. These threats have to be detected as quickly as possible in order to prevent serious environmental damage. Periodical and emergency monitoring activities need to be carried out for successful disaster management and pollution minimization. Airborne remote sensing stands out as an appropriate choice to operate either in an emergency or periodically. Hydrocarbon Index (HI) and Hydrocarbon Detection Index (HDI) utilize the unique absorption features of hydrocarbon based materials at SWIR spectral region. These band ratio based methods require no a priori knowledge of the reference spectrum and can be calculated in real time. This work introduces a flexible airborne pipeline monitoring system based on the online quasi-operational hyperspectral remote sensing system developed at Fraunhofer IOSB, utilizing HI and HDI for oil leak detection on the data acquired by an SWIR imaging sensor. Robustness of HI and HDI compared to state of the art detection algorithms is evaluated in an experimental setup using a synthetic dataset, which was prepared in a systematic way to simulate linear mixtures of selected background and oil spectra consisting of gradually decreasing percentages of oil content. Real airborne measurements in Ettlingen, Germany are used to gather background data while the crude oil spectrum was measured with a field spectrometer. The results indicate that the system can be utilized for online and offline monitoring activities.

  9. Using Geographic Information System - GIS - for pipeline management: case of Urucu-Coari LPG pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Furquim, Maysa P.O. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    This technical paper seeks to demonstrate the stages run during the GIS - Geographic Information System accomplishment as for the follow-up of a pipeline work. The GLPDUTO (LPG Pipeline) Urucu-Coari work shall be the focus of this paper. The main challenges in the compilation of data generated in the work site will be presented, as well the importance for the definition of which data should be relevant, so that the construction company and PETROBRAS could follow up its evolution. The GIS development has been performed since January 2007 and should be finished by the first semester of 2009. The following stages for GIS definition for the work management will be presented: brief history of the project - project conception, purpose, structure implemented and accomplishment expectations; survey data in loco - raw data obtained directly during the carrying out of the work and generated in the project and implantation stage; treated data - data resulting from raw data, but already treated as for the GIS environment; routines developed - specific tools created for the consolidation of the data to be manipulated on GIS in an optimized and functional way; result presented - GIS in its final conception, developed and input with the routines and data regarding the project. (author)

  10. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  11. Pipeline pig or swipe

    Energy Technology Data Exchange (ETDEWEB)

    Girard, H J

    1974-03-26

    A pig or swipe is used for cleaning piplines and for maintaining fluids separated while being transmitted through the line. It is adapted to be propelled through the line by a pressure gradient therein. The pig includes a sponge-like body of foamed plastic material, having an external coating or cover of durable material, such as unfoamed plastic in which reenforcing material, such a wire mesh or glass fabric may be embedded to increase resistance to tearing and wear. The covering is applied to leave openings through which the sponge-like body may project into wiping contact with the surrounding internal surface of the pipe when a longitudinal compressive force is exerted on the pig by the fluid in the pipe in advance of and following the pig therein. The pig also has a barrier layer at one end positioned to close the sponge-like body against the passage of fluid there through and to form a fluid-tight seal with the surrounding pipe. (3 claims)

  12. Wax deposition in crude oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Assuncao, Pablo Morelato; Rodrigues, Lorennzo Marrochi Nolding [Universidade Federal do Espirito Santo, Sao Mateus, ES (Brazil). Centro Universitario Norte do Espirito Santo. Engenharia de Petroleo; Romero, Mao Ilich [University of Wyoming, Laramie, WY (United States). Enhanced Oil Recovery Institute], e-mail: mromerov@uwyo.edu

    2010-07-01

    Crude oil is a complex mixture of hydrocarbons which consists of aromatics, paraffins, naphthenics, resins asphaltenes, etc. When the temperature of crude oil is reduced, the heavy components, like paraffin, will precipitate and deposit on the pipe internal wall in the form of a wax-oil gel. The gel deposit consists of wax crystals that trap some amount of oil. As the temperature gets cooler, more wax will precipitate and the thickness of the wax gel will increase, causing gradual solidification of the crude and eventually the oil stop moving inside the offshore pipeline. Crude oil may not be able to be re-mobilized during re-startup. The effective diameter will be reduced with wax deposition, resulting in several problems, for example, higher pressure drop which means additional pumping energy costs, poor oil quality, use of chemical components like precipitation inhibitors or flowing facilitators, equipment failure, risk of leakage, clogging of the ducts and process equipment. Wax deposition problems can become so sever that the whole pipeline can be completely blocked. It would cost millions of dollars to remediate an offshore pipeline that is blocked by wax. Wax solubility decreases drastically with decreasing temperature. At low temperatures, as encountered in deep water production, is easy to wax precipitate. The highest temperature below which the paraffins begins to precipitate as wax crystals is defined as wax appearance temperature (WAT). Deposition process is a complex free surface problem involving thermodynamics, fluid dynamics, mass and heat transfer. In this work, a numerical analysis of wax deposition by molecular diffusion and shear dispersion mechanisms in crude oil pipeline is studied. Diffusion flux of wax toward the wall is estimated by Fick's law of diffusion, in similar way the shear dispersion; wax concentration gradient at the solid-liquid interface is obtained by the volume fraction conservation equation; and since the wax deposition

  13. Oil pipeline valve automation for spill reduction

    Energy Technology Data Exchange (ETDEWEB)

    Mohitpour, Mo; Trefanenko, Bill [Enbridge Technology Inc, Calgary (Canada); Tolmasquim, Sueli Tiomno; Kossatz, Helmut [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Liquid pipeline codes generally stipulate placement of block valves along liquid transmission pipelines such as on each side of major river crossings where environmental hazards could cause or are foreseen to potentially cause serious consequences. Codes, however, do not stipulate any requirement for block valve spacing for low vapour pressure petroleum transportation, nor for remote pipeline valve operations to reduce spills. A review of pipeline codes for valve requirement and spill limitation in high consequence areas is thus presented along with a criteria for an acceptable spill volume that could be caused by pipeline leak/full rupture. A technique for deciding economically and technically effective pipeline block valve automation for remote operation to reduce oil spilled and control of hazards is also provided. In this review, industry practice is highlighted and application of the criteria for maximum permissible oil spill and the technique for deciding valve automation thus developed, as applied to ORSUB pipeline is presented. ORSUB is one of the three initially selected pipelines that have been studied. These pipelines represent about 14% of the total length of petroleum transmission lines operated by PETROBRAS Transporte S.A. (TRANSPETRO) in Brazil. Based on the implementation of valve motorization on these three pipeline, motorization of block valves for remote operation on the remaining pipelines is intended, depending on the success of these implementations, on historical records of failure and appropriate ranking. (author)

  14. Mortise terrorism on the main pipelines

    Science.gov (United States)

    Komarov, V. A.; Nigrey, N. N.; Bronnikov, D. A.; Nigrey, A. A.

    2018-01-01

    The research aim of the work is to analyze the effectiveness of the methods of physical protection of main pipelines proposed in the article from the "mortise terrorism" A mathematical model has been developed that made it possible to predict the dynamics of "mortise terrorism" in the short term. An analysis of the effectiveness of physical protection methods proposed in the article to prevent unauthorized impacts on the objects under investigation is given. A variant of a video analytics system has been developed that allows detecting violators with recognition of the types of work they perform at a distance of 150 meters in conditions of complex natural backgrounds and precipitation. Probability of detection is 0.959.

  15. Russia: the pipeline diplomacy; Russie: la diplomatie du pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Bourdillon, Y

    2005-01-15

    First world producer of oil and gas, Russia wishes to use its mastery of energy distribution to recover its great power status. The oil and gas pipelines network is the basement used by Russia to build up its hegemony in Europe. The Russian oil and gas companies are also carrying out a long-term strategy of international expansion, in particular thanks to investments in the neighboring countries for the building of new infrastructures or the purchase of oil refineries. (J.S.)

  16. Canadian pipeline contractors in holding pattern

    Energy Technology Data Exchange (ETDEWEB)

    Caron, G [Pe Ben Pipelines Ltd.; Osadchuk, V; Sharp, M; Stabback, J G

    1979-05-21

    A discussion of papers presented at a Pipe Line Contractors Association of Canada convention includes comments by G. Caron (Pe Ben Pipelines Ltd.) on the continued slack in big-inch pipeline construction into 1980 owing mainly to delayed U.S. and Canadian decisions on outstanding Alaska Highway gas pipeline issues and associated gas export bids and on the use of automatic welding for expeditious construction of the northern sections of the Alaska Highway pipeline; by V. Osadchuk (Majestic Wiley Contract. Ltd.) on the liquidation of surplus construction equipment because of these delays; by M. Sharp (Can. North. Pipeline Agency) on the need for close U.S. and Canadian governmental and industrial cooperation to permit an early 1980 start for construction of the prebuild sections of the Alaska pipeline; and by J. G. Stabback (Can. Natl. Energy Board) on the Alaska oil pipeline applications by Foothills Pipe Lines Ltd., Trans Mountain Pipe Line Co. Ltd., and Kitimat Pipe Line Ltd.

  17. Design Optimization of Innovative High-Level Waste Pipeline Unplugging Technologies - 13341

    International Nuclear Information System (INIS)

    Pribanic, T.; Awwad, A.; Varona, J.; McDaniel, D.; Gokaltun, S.; Crespo, J.

    2013-01-01

    Florida International University (FIU) is currently working on the development and optimization of two innovative pipeline unplugging methods: the asynchronous pulsing system (APS) and the peristaltic crawler system (PCS). Experiments were conducted on the APS to determine how air in the pipeline influences the system's performance as well as determine the effectiveness of air mitigation techniques in a pipeline. The results obtained during the experimental phase of the project, including data from pipeline pressure pulse tests along with air bubble compression tests are presented. Single-cycle pulse amplification caused by a fast-acting cylinder piston pump in 21.8, 30.5, and 43.6 m pipelines were evaluated. Experiments were conducted on fully flooded pipelines as well as pipelines that contained various amounts of air to evaluate the system's performance when air is present in the pipeline. Also presented are details of the improvements implemented to the third generation crawler system (PCS). The improvements include the redesign of the rims of the unit to accommodate a camera system that provides visual feedback of the conditions inside the pipeline. Visual feedback allows the crawler to be used as a pipeline unplugging and inspection tool. Tests conducted previously demonstrated a significant reduction of the crawler speed with increasing length of tether. Current improvements include the positioning of a pneumatic valve manifold system that is located in close proximity to the crawler, rendering tether length independent of crawler speed. Additional improvements to increase the crawler's speed were also investigated and presented. Descriptions of the test beds, which were designed to emulate possible scenarios present on the Department of Energy (DOE) pipelines, are presented. Finally, conclusions and recommendations for the systems are provided. (authors)

  18. Design and Testing of the Strain Transducer for Measuring Deformations of Pipelines Operating in the Mining-deformable Ground Environment

    Directory of Open Access Journals (Sweden)

    Gawedzki Waclaw

    2015-10-01

    Full Text Available Design and laboratory test results of the strain transducer intended for monitoring and assessing stress states of pipelines sited in mining areas are presented in this paper. This transducer allows measuring strains of pipelines subjected to external forces - being the mining operations effect. Pipeline strains can have a direct influence on a tightness loss and penetration of the transported fluid into the environment. The original strain gauge transducer was proposed for performing measurements of strains. It allows measuring circumferential strains and determining the value and direction of the main longitudinal strain. This strain is determined on the basis of measuring component longitudinal strains originating from axial forces and the resultant bending moment. The main purpose of investigations was the experimental verification of the possibility of applying the strain transducer for measuring strains of polyethylene pipelines. The obtained results of the transducer subjected to influences of tensile and compression forces are presented and tests of relaxation properties of polyethylene are performed.

  19. Economic model of pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.

    1977-07-29

    The objective of the work reported here was to develop a model which could be used to assess the economic effects of energy-conservative technological innovations upon the pipeline industry. The model is a dynamic simulator which accepts inputs of two classes: the physical description (design parameters, fluid properties, and financial structures) of the system to be studied, and the postulated market (throughput and price) projection. The model consists of time-independent submodels: the fluidics model which simulates the physical behavior of the system, and the financial model which operates upon the output of the fluidics model to calculate the economics outputs. Any of a number of existing fluidics models can be used in addition to that developed as a part of this study. The financial model, known as the Systems, Science and Software (S/sup 3/) Financial Projection Model, contains user options whereby pipeline-peculiar characteristics can be removed and/or modified, so that the model can be applied to virtually any kind of business enterprise. The several dozen outputs are of two classes: the energetics and the economics. The energetics outputs of primary interest are the energy intensity, also called unit energy consumption, and the total energy consumed. The primary economics outputs are the long-run average cost, profit, cash flow, and return on investment.

  20. Archaeological Excavations on the BTC Pipeline, Azerbaijan

    Directory of Open Access Journals (Sweden)

    Paul Michael Taylor

    2011-06-01

    Full Text Available The archaeology and history of the Republic of Azerbaijan is not widely known in comparison with that of its neighbours. A recent summary of work in the Caucasus (Smith and Rubinson 2003 contained no specific references to results from Azerbaijan, although the studies were directly comparable and overlapped in period and geography. The reasons for this are many, perhaps the most influential is the presentation of material from Azerbaijan being confused with southern Azerbaijan in Iran in the wider academic audience and the use of the Cyrillic alphabet for reports written in the Azeri language over the past century. The Baku-Tbilisi-Ceyhan (BTC and South Caucasus Pipelines (SCP were constructed through Azerbaijan, Georgia and Turkey during the period 2003-5. BTC was built first from the Caspian Coast to the Georgian border during 2003 and 2004, while the SCP pipeline was built from the Georgian border towards the Caspian and parallel to the BTC in 2005. To investigate and mitigate the effects of this construction, a four year archaeological fieldwork programme (2001-2005 was carried out, followed by a further six-year post-excavation programme that ended in early 2011. This article draws on this extensive archaeological project that combines both the broad corpus of material known in Azerbaijan and new techniques introduced in the Republic for the first time and used on a range of sites that are of both national and international significance.

  1. Quantitative risk analysis preoperational of gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Manfredi, Carlos; Bispo, Gustavo G.; Esteves, Alvaro [Gie S.A., Buenos Aires (Argentina)

    2009-07-01

    The purpose of this analysis is to predict how it can be affected the individual risk and the public's general security due to the operation of a gas pipeline. In case that the single or social risks are considered intolerable, compared with the international standards, to be recommended measures of mitigation of the risk associated to the operation until levels that can be considered compatible with the best practices in the industry. The quantitative risk analysis calculates the probability of occurrence of an event based on the frequency of occurrence of the same one and it requires a complex mathematical treatment. The present work has as objective to develop a calculation methodology based on the previously mentioned publication. This calculation methodology is centered in defining the frequencies of occurrence of events, according to representative database of each case in study. Besides, it settles down the consequences particularly according to the considerations of each area and the different possibilities of interferences with the gas pipeline in study. For each one of the interferences a typical curve of ignition probabilities is developed in function from the distance to the pipe. (author)

  2. Eesti Gaas. Inspection of Kohtal-Jaerve - Tallinn pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The project `Inspection of Pipelines in Estonia` was funded by Danish government and was carried out in collaboration between DONG, Balslev and FORCE. By agreement between Eesti Gaas and DONG, the pipeline system between Kohtla-Jaerve and Tallinn was selected for inspection. This pipeline system has a total length of 176.9 km. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. The objectives have been met as set out by the project Proposal with the investigation and this report as follows: Based on a document review together with the measurements and observations in the field and in the laboratory, the condition of approximately 5 km of the pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline. A further objective has been to provide know-how transfer in order to permit Eesti Gaas to run similar inspections on other parts of their transmission system. (EG)

  3. Influence of soil properties on the behavior of heated on bottom pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Hallai, Julian [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Offshore pipelines have increasingly been operating at high temperatures and high pressures. Compression due to these loads can lead to global buckling, either laterally and/or vertically, depending on the burial depth and soil properties. The amount of embedment of pipelines directly laid on the seabed depends on the soil properties and influences the behavior of pipelines in operation. This work investigates the interaction between the vertical and lateral buckling modes, based on the analytical approach proposed for pipeline global buckling analysis by Hobbs. Furthermore, it presents a sensitivity study characterizing the impact of the determination of accurate soil properties. Finally, a conceptual design procedure, which takes into account the particular case of short pipelines, is provided. The method is presented by means of an example case. (author)

  4. Some technological aspects of the functioning of the Thessalonica-OKTA oil pipeline

    International Nuclear Information System (INIS)

    Zikovski, Toni

    2004-01-01

    Crude oil pipeline Solun-Okta was built according to international technical, ecological and safety standards and enables quick, optimal and continuity supply of OKTA Refinery with crude oil. The building of the pipeline began in 1999, and finished in 2002 with official start-up operation by pumping of first quantity crude oil. After the activation, human environment protection has an important place. A lot of instructions and procedures are prepared especial for this purpose. With a total length about 212 km, pipeline enables transport of crude oil from ECO Refinery to OKTA with a capacity of 2.5 million tons per year. Pipeline is designed for a transport of few types crude oil and their mixtures. Pipeline system has been equipped with sophistic and modern equipment, which will enable quality of the work by controlling and monitoring of the system. (Author)

  5. Some technological aspects for functioning of crude oil pipeline Solun-OKTA

    International Nuclear Information System (INIS)

    Zikovski, Toni

    2005-01-01

    Crude oil pipeline Solun-Okta was built according to international technical, ecological and safety standards and enables quick, optimal and continuity supply of OKTA Refinery with crude oil. The building of the pipeline began in 1999 and finished in 2002 with official start-up operation by pumping of first quantity crude oil. After the activation, human environment protection has an important place. A lot of instructions and procedures are prepared specially for this purpose. With a total length about 212 km, pipeline enables transport of crude oil from ECO Refinery to OKTA with a capacity of 2.5 million tons per year. The pipeline is designed for transport of few types crude oil and their mixtures. The pipeline system has been equipped with sophisticated and modern equipment, which will enable quality of the work by controlling and monitoring of the system. (Author)

  6. Some technological aspects for functioning of crude oil pipeline Solun-Okta

    International Nuclear Information System (INIS)

    Zikovski, Toni

    2005-01-01

    Crude oil pipeline Solun-Okta was built according to international technical, ecological and safety standards and enables quick, optimal and continuity supply of OKTA Refinery with crude oil. The building of the pipeline began in 1999 and finished in 2002 with official start-up operation by pumping of first quantity crude oil. After the activation, human environment protection has an important place. A lot of instructions and procedures are prepared specially for this purpose. With a total length about 212 km, pipeline enables transport of crude oil from ECO Refinery to OKTA with a capacity of 2.5 million tons per year. The pipeline is designed for transport of few types crude oil and their mixtures. The pipeline system has been equipped with sophisticated and modern equipment, which will enable quality of the work by controlling and monitoring of the system. (Author)

  7. Markov chain model helps predict pitting corrosion depth and rate in underground pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Caleyo, F.; Velazquez, J.C.; Hallen, J. M. [ESIQIE, Instituto Politecnico Nacional, Mexico D. F. (Mexico); Esquivel-Amezcua, A. [PEMEX PEP Region Sur, Villahermosa, Tabasco (Mexico); Valor, A. [Universidad de la Habana, Vedado, La Habana (Cuba)

    2010-07-01

    Recent reports place pipeline corrosion costs in North America at seven billion dollars per year. Pitting corrosion causes the higher percentage of failures among other corrosion mechanisms. This has motivated multiple modelling studies to be focused on corrosion pitting of underground pipelines. In this study, a continuous-time, non-homogenous pure birth Markov chain serves to model external pitting corrosion in buried pipelines. The analytical solution of Kolmogorov's forward equations for this type of Markov process gives the transition probability function in a discrete space of pit depths. The transition probability function can be completely identified by making a correlation between the stochastic pit depth mean and the deterministic mean obtained experimentally. The model proposed in this study can be applied to pitting corrosion data from repeated in-line pipeline inspections. Case studies presented in this work show how pipeline inspection and maintenance planning can be improved by using the proposed Markovian model for pitting corrosion.

  8. Modelling the pressurization induced by solar radiation on above ground installations of LPG pipeline systems

    Science.gov (United States)

    Leporini, M.; Terenzi, A.; Marchetti, B.; Giacchetta, G.; Polonara, F.; Corvaro, F.; Cocci Grifoni, R.

    2017-11-01

    Pipelining Liquefied Petroleum Gas (LPG) is a mode of LPG transportation more environmentally-friendly than others due to the lower energy consumption and exhaust emissions. Worldwide, there are over 20000 kilometers of LPG pipelines. There are a number of codes that industry follows for the design, fabrication, construction and operation of liquid LPG pipelines. However, no standards exist to modelling particular critical phenomena which can occur on these lines due to external environmental conditions like the solar radiation pressurization. In fact, the solar radiation can expose above ground pipeline sections at pressure values above the maximum Design Pressure with resulting risks and problems. The present work presents an innovative practice suitable for the Oil & Gas industry to modelling the pressurization induced by the solar radiation on above ground LPG pipeline sections with the application to a real case.

  9. Corrosion mapping in pipelines

    International Nuclear Information System (INIS)

    Zscherpel, U.; Alekseychuk, O.; Bellon, C.; Ewert, U.; Rost, P.; Schmid, M.

    2002-01-01

    In a joint research project, BASF AG and BAM analyzed the state of the art of tangential radiography of pipes and developed more efficient methods of evaluation. Various PC applications were developed and tested: 1. A program for routine evaluation of digital radiographic images. 2. 3D simulation of the tangential projection of pipes for common radiation sources and various different detectors. 3. Preliminary work on combined evaluation of digital projections and wall thickness changes in radiation direction resulted in a new manner of image display, i.e. the so-called 'corrosion mapping', in which the wall thickness is displayed as a 2D picture above the pipe surface [de

  10. On-line chemical cleaning of pipelines; Limpieza quimica de ductos en linea

    Energy Technology Data Exchange (ETDEWEB)

    Cross, Michael Brent [Brenntag Stinnes Logistics, Muelheim/Ruhr (Germany)

    2003-07-01

    The concern of efficiency and maintenance in the pipeline industry, due to fluids and sediments, has led the development of new methods of cleaning. Some methods of cleaning are described in this work with their advantages and disadvantages.

  11. Residual stresses evaluation in a gas-pipeline crossing

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Maria Cindra [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil); Almeida, Manoel Messias [COMPAGAS, Curitiba, PR (Brazil); Rebello, Joao Marcos Alcoforado [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil); Souza Filho, Byron Goncalves de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The X-rays diffraction technique is a well established and effectiveness method in the determination of the residual and applied stresses in fine grained crystalline materials. It allows to characterize and to quantify the magnitude and direction of the existing surface stresses in the studied point of the material. The objective of this work is the evaluation of the surface stresses in a 10 in diameter Natural Gas Distribution Pipeline manufactured from API 5 L Gr B steel of COMPAGAS company, in a crossing with a Natural Gas Transportation Pipeline, in Araucaria-PR. This kind of evaluation is important to establish weather you have to perform a repositioning of one of the pipeline or not. The measurements had been made in two transversal sections of the pipe, the one upstream (170 mm of the external wall of the pipeline) and another one downstream (840 mm of the external wall of the pipeline). Each transversal section measurements where carried out in 3 points: 9 hours, 12 hours and 3 hours. In each measured point of the pipe surface, the longitudinal and transversal stresses had been measured. The magnitude of the surface residual stresses in the pipe varied of +180 MPa at the -210 MPa. The residual stress state on the surface of the points 12 hours region is characterized by tensile stresses and by compressive stresses in the points of 3 and 9 hours region. The surface residual stresses in gas-pipeline have been measured using X-ray diffraction method, by double exposure technique, using a portable apparatus, with Cr-K-alpha radiation. (author)

  12. Pipeline system for gas centrifuge

    International Nuclear Information System (INIS)

    Masumoto, Tsutomu; Umezawa, Sadao.

    1977-01-01

    Purpose: To enable effective operation for the gas centrifuge cascade system upon failures in the system not by interrupting the operation of all of the centrifuges in the system but by excluding only the failed centrifuges. Constitution: A plurality of gas centrifuges are connected by way of a pipeline and an abnormal detector for the automatic detection of abnormality such as destruction in a vacuum barrel and loss of vacuum is provided to each of the centrifuges. Bypass lines for short-circuitting adjacent centrifuges are provided in the pipelines connecting the centrifuges. Upon generation of abnormality in a centrifuge, a valve disposed in the corresponding bypass is automatically closed or opened by a signal from the abnormal detector to change the gas flow to thereby exclude the centrifuge in abnormality out of the system. This enables to effectively operate the system without interrupting the operation for the entire system. (Moriyama, K.)

  13. Oil pipeline performance review, 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This paper reviews the environmental performance of Canadian oil pipelines in spill prevention and control in 1990 and compares it with that in 1989. In 1990, in-service length of the systems reporting increased to 34,907 km. Traffic volume was 235 million m 3 . Failures dropped 16% from 1989 to 36. Equipment failures accounted for 47%, corrosion for 22% and operational error for 19% of the failures. Repair, damage and clean-up costs were considerably higher at $5,302,000, of which one external corrosion failure contributed $4,500,000. The average spill size was 130 m 3 with 72 m 3 recovered for a 55.4% recovery rate. No injuries resulted from the failures. An 11 year statistical summary of oil pipeline performance data is included. 3 figs., 5 tabs

  14. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  15. Analysis of integrity and risk for onshore pipelines; Analise de integridade e risco para dutos onshore

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Marco Aurelio [Det Norske Veritas (DNV), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The increasing expansion of the oil and gas industry in Brazil, the current legal requirements relating to security, health and environment in the industrial installations, is necessary that the companies, responsible by the operation of pipelines for oil and gas transport, adopt efficient techniques to assure the operational continuity of these of trustworthy form and insurance. To fulfill this important function it is important that the companies implement a management program to control and register the integrity of the pipelines during the all operational life cycle. Inside of this context of management of the integrity of pipelines, the DNV developed the software ORBIT Pipeline with the intention to serve as an important tool to monitor the technique and security condition of the pipeline, to define the frequency and content technician of the inspection program and to recommend the work of intervention or repair in pipeline when necessary. Additionally to these activities that are carried through directly in the ORBIT Pipeline, also an evaluation of the activity of third part and the land/soil movement is made inside of the systematic for analysis of integrity and risk for onshore pipelines performed by DNV. (author)

  16. Saudi Aramco experience towards establishing Pipelines Integrity Management Systems (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    AlAhmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  17. Saudi Aramco experience towards establishing Pipelines Integrity Management System (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Al-Ahmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  18. Shore approach of Camarupim pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Bernardi, Tiaraju P.; Oliveira Neto, Vasco A. de; Siqueira, Jakson [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Camarupim Field is located in the northern portion of Espirito Santo Basin and was discovered from the drilling of the well 1-ESS-164 in 2006. It is a gas field which start of the production is in mid of 2009. The production unit will be a FPSO (Floating Production, Storage and Offloading) and the gas will flow through a pipeline with diameter ranging from 12 inches and 24 inches with approximately 60 km long, from the FPSO Cidade de Sao Mateus to UTGC (Unit for Treatment of Gas Cacimbas-Linhares-ES). The FPSO will have processing capacity of 10MMm3/day of gas. Due to the approach of the pipeline in the continental portion, located in an environmental protection area and place of spawning of sea turtles, the connection between the stretch of sea and land pipeline running through a shore approach, known and proven technique of horizontal directional drilling about 950m in length. This paper will be shown the assumptions adopted, the technique employed, the challenges faced by the team and the lessons learned to build the directional hole. (author)

  19. The relationship between employment quality and work-related well-being in the European labor force

    NARCIS (Netherlands)

    Van Aerden, K.; Moors, G.B.D.; Levecque, K.; Vanroelen, C.

    2015-01-01

    In this article, data from the 2005 European Working Conditions Survey are used to examine the relationship between contemporary employment arrangements and the work-related well-being of European employees. By means of a Latent Class Cluster Analysis, several features of the employment conditions

  20. SOCIAL-PEDAGOGICAL WORK WITH CHILDREN WHO ARE FORCEDLY RE-SETTLED FROM THE ZONE OF MILITARY CONFLICT TO THE SPECIALLY CREATED SETTLEMENTS

    Directory of Open Access Journals (Sweden)

    Liudmila Tsybulko

    2016-11-01

    Full Text Available The normative documents, statistic data concerning the people, who are forcedly resettled, are analysed in the article. The aim of the article is to describe the organizational stages of social workers; to determine the features of each stage, to consider the most effective methods and forms of each of the identified stages. Separate facts of creating towns for settlers are studied; information, given in scientific sociological and psychological works, is generalized. The stages of social activity of educators with children of compelled settlers (preparatory, organizational-active and analytical-corrective are determined on the basis of the carried out analysis. The essence of the activity, the methods and forms, the efficiency in realization of work with children, who are forcedly resettled, will be higher upon condition of drawing parents into corresponding forms and kinds of social pedagogical work. The author singles out three stages of work: the preparatory, organizational and activity, analytical and corrective stage. The methods and techniques of social work that shold be applied on each stage are disclosed. The author emphasizes, that not only professionals in the field of education but also representatives of state institutions – organs of executive power, health service, town centers of social service for family, children and youth, public organizations, charity funds and volunteers, which have corresponding specialization or special training, should be drown into realization of proposed stages of work with children-settlers. The author comes to the conclusion that in sprite of existence of already organized work with settlers’ families in Ukraine, more attention should be paid just to work with children because this generation creates the future of our country.

  1. State observers for monitoring gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, M.J.; Jones, R.P.; Pritchard, A.J.

    1987-03-01

    This paper describes work performed on collaboration with the British Gas Corporation in relation to the development of algorithms for monitoring the condition of high-pressure gas pipelines. The practical problem considered is that of reconstructing the pressure profile along a single length of pipe from pressure measurements at the end points and a further measurement at an intermediate point along the pipe. The approach adopted is based on the implementation of a finite-dimensional asymptotic state observer derived from consideration of the distributed-parameter properties of the system. The paper includes the results of a computational study in which the observer was evaluated against experimental data corresponding to an 80 km section of pipe. These results indicate that the dynamic observer is capable of providing an accurate estimate of the pressure profile over a complete 24 h demand cycle. 5 refs. (authors).

  2. Development of high productivity pipeline girth welding

    International Nuclear Information System (INIS)

    Yapp, David; Liratzis, Theocharis

    2010-01-01

    The trend for increased oil and gas consumption implies a growth of long-distance pipeline installations. Welding is a critical factor in the installation of pipelines, both onshore and offshore, and the rate at which the pipeline can be laid is generally determined by the speed of welding. This has resulted in substantial developments in pipeline welding techniques. Arc welding is still the dominant process used in practice, and forge welding processes have had limited successful application to date, in spite of large investments in process development. Power beam processes have also been investigated in detail and the latest laser systems now show promise for practical application. In recent years the use of high strength steels has substantially reduced the cost of pipeline installation, with X70 and X80 being commonly used. This use of high strength pipeline produced by thermomechanical processing has also been researched. They must all meet three requirments, high productivity, satisfactory weld properties, and weld quality

  3. Pipelines, inexpensive and safe mode of transport

    Energy Technology Data Exchange (ETDEWEB)

    Grover, D D

    1979-01-01

    Pipelines are the leading bulk commodity transporter and should play an even more important role in the future of energy transportation and distribution. As fossil fuel and low-cost uranium resources become depleted, it will be economical to produce hydrogen by electrolysis and transport it through underground pipelines to points of consumption. The cost would be only two to three times that of transporting natural gas per unit of heat energy and substantially less than the cost of transporting electric energy in overhead, extra-high-voltage transmission lines. Pipeline design, including economic pipe diameter; pipe material; operation by remote control and automation; cathodic protection; pipeline construction; and pipeline maintenance, particularly as regards the 1157 km long Oil India Pipeline, are discussed.

  4. Sea water pipeline for nuclear power plant

    International Nuclear Information System (INIS)

    Ueno, Ken-ichi.

    1992-01-01

    Heating coils, for example, are wound around sea water pipelines as a heater. The outer wall surface of the sea water pipelines is heated by the heating coils. The inner wall surfaces of the sea water pipelines can be warmed to higher than a predetermined temperature by heating the outer wall surfaces to die out marine organisms deposited at the inner surfaces. Further, thermocouples for the external wall and the internal wall are disposed so that the temperature at the inner wall surface of the sea water pipelines can be controlled. Further, a temperature keeping material is disposed at the external surface of the sea water system pipelines. With such a constitution, the marine organisms deposited on the internal wall surface of the sea water system pipelines are died out to suppress the deposition amount of the marine organisms. Accordingly, the maintenance and the operation reliability is improved after maintenance. (I.N.)

  5. Perceptions of gender equality in work-life balance, salary, promotion, and harassment: results of the NASPGHAN task force survey.

    Science.gov (United States)

    Tomer, Gitit; Xanthakos, Stavra; Kim, Sandra; Rao, Meenakshi; Book, Linda; Litman, Heather J; Fishman, Laurie N

    2015-04-01

    Gender equality in the workplace has not been described in pediatric gastroenterology. An electronic survey that explored perceptions of career parity, work-life balance, and workplace harassment was sent to all members of the North American Society for Pediatric Gastroenterology, Hepatology, and Nutrition. Reponses were anonymous. Of the 303 respondents (21%), there was an even distribution across geographic region, age, and gender (54% men). Gender affected perception of salary and promotion; 46% of men but only 9% of women feel that "women earn the same as men" (P work-life balance for either gender. Overall, women are more likely to be dissatisfied with work-life balance than men (P = 0.046). Satisfaction with work-life balance is lower among women versus men pediatric gastroenterologists, but does not correlate with flexibility of spouse's job or caring for young children. Gender-divergent perception of promotion, parity of compensation, and mentoring requires further investigation.

  6. Soil Vapor Extraction and Bioventing Test Work Plan for the MOGAS Site, Myrtle Beach Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1995-01-01

    This work plan presents an evaluation of soil vapor extraction (SVE) and bioventing, and describes the SVE pilot scale and bioventing activities to be conducted to extract and treat soil gas at Installation Restoration Program (IRP...

  7. Bioventing Pilot Test Work Plan for Site ST200 (SA38), McClellan Air Force Base, California

    National Research Council Canada - National Science Library

    1997-01-01

    This Bioventing Pilot Test Work Plan presents the scope of an in situ bioventing pilot test and installation of a bioventing system for treatment of petroleum hydrocarbon-contaminated soils at Site...

  8. Development and Applications of Pipeline Steel in Long-Distance Gas Pipeline of China

    Science.gov (United States)

    Chunyong, Huo; Yang, Li; Lingkang, Ji

    In past decades, with widely utilizing of Microalloying and Thermal Mechanical Control Processing (TMCP) technology, the good matching of strength, toughness, plasticity and weldability on pipeline steel has been reached so that oil and gas pipeline has been greatly developed in China to meet the demand of strong domestic consumption of energy. In this paper, development history of pipeline steel and gas pipeline in china is briefly reviewed. The microstructure characteristic and mechanical performance of pipeline steel used in some representative gas pipelines of china built in different stage are summarized. Through the analysis on the evolution of pipeline service environment, some prospective development trend of application of pipeline steel in China is also presented.

  9. Measures for security and supervision of pipelines; Massnahmen zur Pipeline-Sicherheit und -Ueberwachung

    Energy Technology Data Exchange (ETDEWEB)

    Horlacher, Hans-Burkhard [TU Dresden (Germany). Inst. fuer Wasserbau und Technische Hydromechanik; Giesecke, Juergen [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    2010-07-01

    In a previous publication, the two authors dealt with the hydraulic problems as regards mineral oil pipelines. The present report describes the measures mainly used to guarantee the safety of such pipelines. (orig.)

  10. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    Science.gov (United States)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  11. Landscape susceptibility, hazard and risk assessments along pipeline corridors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Blais-Stevens, A.; Couture, R.; Page, A. [Natural Resources Canada, Ottawa, ON (Canada). Geological Survey of Canada; Koch, J.; Clague, J.J. [Simon Fraser Univ., Burnaby, BC (Canada); Lipovsky, P.S. [Yukon Geological Survey, Whitehorse, YT (Canada)

    2010-07-01

    This article discussed work that was carried out to inventory landslides and assess hazards along two proposed gas-pipeline routes in the North. Landslide inventories and hazard assessments are necessary to quantify and qualify the risk of environmental impacts from landslides on linear infrastructure. The Yukon Alaska Highway Pipeline and the Mackenzie Gas Project Pipeline, which will both be over 800 kilometres in length, will cross harsh landscapes characterized by permafrost terrain and will be at risk from geological hazards, including landslides with debris flows, earthquakes, subsidence, and permafrost degradation. The work involved inventorying and mapping landslides via aerial photography and field visits to identify the frequency-magnitude relationships for debris flow fans along the route and the creation of qualitative parametric landslide maps for both proposed pipeline corridors. A good correlation was found between actual landslide distribution and the landslide susceptibility maps. For the Mackenzie Valley Pipeline Corridor, most landslides have occurred in fine unconsolidated sediments and shallow slopes. Landslides in the Yukon Alaska Highway Corridor mostly happened in unconsolidated sediments, but a few took place in bedrock with high relief. The preliminary investigation revealed that a slope hazard exists in both corridors and must be taken into account during pipeline development. The results are intended to facilitate better decision-making for planning, constructing, and maintaining safe and economically viable pipeline routes in Northern Canada. The mapping methodology was outlined. 13 refs., 1 tab., 6 figs.

  12. Strength analysis of copper gas pipeline span

    OpenAIRE

    Ianevski, Philipp

    2016-01-01

    The purpose of the study was to analyze the stresses in a gas pipeline. While analyzing piping systems located inside building were used. Calculation of the strength of a gas pipeline is done by using information of the thickness of pipe walls, by choosing the suitable material, inner and outer diameter for the pipeline. Data for this thesis was collected through various internet sources and different books. From the study and research, the final results were reached and calculations were ...

  13. Preliminary results from the hierarchical glitch pipeline

    International Nuclear Information System (INIS)

    Mukherjee, Soma

    2007-01-01

    This paper reports on the preliminary results obtained from the hierarchical glitch classification pipeline on LIGO data. The pipeline that has been under construction for the past year is now complete and end-to-end tested. It is ready to generate analysis results on a daily basis. The details of the pipeline, the classification algorithms employed and the results obtained with one days analysis on the gravitational wave and several auxiliary and environmental channels from all three LIGO detectors are discussed

  14. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  15. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  16. Determination of Erosion/Corrosion Rates in Hanford Tank Farms Radioactive Waste Transfer System Pipelines

    International Nuclear Information System (INIS)

    Washenfelder, D. J.; Girardot, C. L.; Wilson, E. R.; Page, J. A.; Engeman, J. K.; Gunter, J. R.; Johnson, J. M.; Baide, D. G.; Cooke, G. A.; Larson, J. D.; Castleberry, J. L.; Boomer, K. D.

    2015-01-01

    The twenty-eight double-shell underground radioactive waste storage tanks at the U. S. Department of Energy's Hanford Site near Richland, WA are interconnected by the Waste Transfer System network of buried steel encased pipelines and pipe jumpers in below-grade pits. The pipeline material is stainless steel or carbon steel in 51 mm to 152 mm (2 in. to 6 in.) sizes. The pipelines carry slurries ranging up to 20 volume percent solids and supernatants with less than one volume percent solids at velocities necessary to prevent settling. The pipelines, installed between 1976 and 2011, were originally intended to last until the 2028 completion of the double-shell tank storage mission. The mission has been subsequently extended. In 2010 the Tank Operating Contractor began a systematic evaluation of the Waste Transfer System pipeline conditions applying guidelines from API 579-1/ASME FFS-1 (2007), Fitness-For-Service. Between 2010 and 2014 Fitness-for-Service examinations of the Waste Transfer System pipeline materials, sizes, and components were completed. In parallel, waste throughput histories were prepared allowing side-by-side pipeline wall thinning rate comparisons between carbon and stainless steel, slurries and supernatants and throughput volumes. The work showed that for transfer volumes up to 6.1E+05 m"3 (161 million gallons), the highest throughput of any pipeline segment examined, there has been no detectable wall thinning in either stainless or carbon steel pipeline material regardless of waste fluid characteristics or throughput. The paper describes the field and laboratory evaluation methods used for the Fitness-for-Service examinations, the results of the examinations, and the data reduction methodologies used to support Hanford Waste Transfer System pipeline wall thinning conclusions.

  17. Determination of Erosion/Corrosion Rates in Hanford Tank Farms Radioactive Waste Transfer System Pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Washenfelder, D. J.; Girardot, C. L.; Wilson, E. R.; Page, J. A.; Engeman, J. K.; Gunter, J. R.; Johnson, J. M.; Baide, D. G.; Cooke, G. A.; Larson, J. D.; Castleberry, J. L.; Boomer, K. D.

    2015-11-05

    The twenty-eight double-shell underground radioactive waste storage tanks at the U. S. Department of Energy’s Hanford Site near Richland, WA are interconnected by the Waste Transfer System network of buried steel encased pipelines and pipe jumpers in below-grade pits. The pipeline material is stainless steel or carbon steel in 51 mm to 152 mm (2 in. to 6 in.) sizes. The pipelines carry slurries ranging up to 20 volume percent solids and supernatants with less than one volume percent solids at velocities necessary to prevent settling. The pipelines, installed between 1976 and 2011, were originally intended to last until the 2028 completion of the double-shell tank storage mission. The mission has been subsequently extended. In 2010 the Tank Operating Contractor began a systematic evaluation of the Waste Transfer System pipeline conditions applying guidelines from API 579-1/ASME FFS-1 (2007), Fitness-For-Service. Between 2010 and 2014 Fitness-for-Service examinations of the Waste Transfer System pipeline materials, sizes, and components were completed. In parallel, waste throughput histories were prepared allowing side-by-side pipeline wall thinning rate comparisons between carbon and stainless steel, slurries and supernatants and throughput volumes. The work showed that for transfer volumes up to 6.1E+05 m3 (161 million gallons), the highest throughput of any pipeline segment examined, there has been no detectable wall thinning in either stainless or carbon steel pipeline material regardless of waste fluid characteristics or throughput. The paper describes the field and laboratory evaluation methods used for the Fitness-for-Service examinations, the results of the examinations, and the data reduction methodologies used to support Hanford Waste Transfer System pipeline wall thinning conclusions.

  18. Transforming microbial genotyping: a robotic pipeline for genotyping bacterial strains.

    Directory of Open Access Journals (Sweden)

    Brian O'Farrell

    Full Text Available Microbial genotyping increasingly deals with large numbers of samples, and data are commonly evaluated by unstructured approaches, such as spread-sheets. The efficiency, reliability and throughput of genotyping would benefit from the automation of manual manipulations within the context of sophisticated data storage. We developed a medium- throughput genotyping pipeline for MultiLocus Sequence Typing (MLST of bacterial pathogens. This pipeline was implemented through a combination of four automated liquid handling systems, a Laboratory Information Management System (LIMS consisting of a variety of dedicated commercial operating systems and programs, including a Sample Management System, plus numerous Python scripts. All tubes and microwell racks were bar-coded and their locations and status were recorded in the LIMS. We also created a hierarchical set of items that could be used to represent bacterial species, their products and experiments. The LIMS allowed reliable, semi-automated, traceable bacterial genotyping from initial single colony isolation and sub-cultivation through DNA extraction and normalization to PCRs, sequencing and MLST sequence trace evaluation. We also describe robotic sequencing to facilitate cherrypicking of sequence dropouts. This pipeline is user-friendly, with a throughput of 96 strains within 10 working days at a total cost of 200,000 items were processed by two to three people. Our sophisticated automated pipeline can be implemented by a small microbiology group without extensive external support, and provides a general framework for semi-automated bacterial genotyping of large numbers of samples at low cost.

  19. Reducing Attrition in Selected Air Force Training Pipelines

    Science.gov (United States)

    2012-01-01

    reactions to it, reflects an ongoing set of opposing tensions between individualistic and collectivistic norms. On the one hand, service members are...identifying, . . . analyzing information; geographical and cultural aspects of foreign countries; current military capabilities and employment...in the language, appre- ciation of teachers, and interest in cultural aspects of the course. A typical comment was that DLIFLC is “intense and

  20. Thermal expansion absorbing structure for pipeline

    International Nuclear Information System (INIS)

    Nagata, Takashi; Yamashita, Takuya.

    1995-01-01

    A thermal expansion absorbing structure for a pipeline is disposed to the end of pipelines to form a U-shaped cross section connecting a semi-circular torus shell and a short double-walled cylindrical tube. The U-shaped longitudinal cross-section is deformed in accordance with the shrinking deformation of the pipeline and absorbs thermal expansion. Namely, since the central lines of the outer and inner tubes of the double-walled cylindrical tube deform so as to incline, when the pipeline is deformed by thermal expansion, thermal expansion can be absorbed by a simple configuration thereby enabling to contribute to ensure the safety. Then, the entire length of the pipeline can greatly be shortened by applying it to the pipeline disposed in a high temperature state compared with a method of laying around a pipeline using only elbows, which has been conducted so far. Especially, when it is applied to a pipeline for an FBR-type reactor, the cost for the construction of a facility of a primary systems can greater be reduced. In addition, it can be applied to a pipeline for usual chemical plants and any other structures requiring absorption of deformation. (N.H.)

  1. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  2. Acoustic system for communication in pipelines

    Science.gov (United States)

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  3. Tubular lining material for pipelines having bends

    Energy Technology Data Exchange (ETDEWEB)

    Moringa, A.; Sakaguchi, Y.; Hyodo, M.; Yagi, I.

    1987-03-24

    A tubular lining material for pipelines having bends or curved portions comprises a tubular textile jacket made of warps and wefts woven in a tubular form overlaid with a coating of a flexible synthetic resin. It is applicable onto the inner surface of a pipeline having bends or curved portions in such manner that the tubular lining material with a binder onto the inner surface thereof is inserted into the pipeline and allowed to advance within the pipeline, with or without the aid of a leading rope-like elongated element, while turning the tubular lining material inside out under fluid pressure. In this manner the tubular lining material is applied onto the inner surface of the pipeline with the binder being interposed between the pipeline and the tubular lining material. The lining material is characterized in that a part of all of the warps are comprised of an elastic yarn around which, over the full length thereof, a synthetic fiber yarn or yarns have been left-and/or right-handedly coiled. This tubular lining material is particularly suitable for lining a pipeline having an inner diameter of 25-200 mm and a plurality of bends, such as gas service pipelines or house pipelines, without occurrence of wrinkles in the lining material in a bend.

  4. A quick guide to pipeline engineering

    CERN Document Server

    Alkazraji, D

    2008-01-01

    Pipeline engineering requires an understanding of a wide range of topics. Operators must take into account numerous pipeline codes and standards, calculation approaches, and reference materials in order to make accurate and informed decisions.A Quick Guide to Pipeline Engineering provides concise, easy-to-use, and accessible information on onshore and offshore pipeline engineering. Topics covered include: design; construction; testing; operation and maintenance; and decommissioning.Basic principles are discussed and clear guidance on regulations is provided, in a way that will

  5. East, West German gas pipeline grids linked

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ruhrgas AG, Essen, has started up the first large diameter gas pipeline linking the gas grids of former East and West Germany. Ruhrgas last month placed in service a 40 in., 70 km line at Vitzeroda, near Eisenach, linking a new Ruhrgas pipeline in Hesse state with a 330 km gas pipeline built last year in Thuringia and Saxony states by Erdgasversorgungs GmbH (EVG), Leipzig. The new link enables pipeline operator EVG to receive 70 bcf/year of western European gas via Ruhrgas, complementing the 35 bcf/year of gas coming from the Commonwealth of Independent States via Verbundnetz Gas AG (VNG), Leipzig

  6. Work force retention: Role of work environment, organization commitment, supervisor support and training & development in ceramic sanitary ware industries in India

    Energy Technology Data Exchange (ETDEWEB)

    Umamaheswari S, Jayasree Krishnan

    2016-07-01

    Although retention of employees has become hot topic in this career turbulent era, practically no empirical research is carried out in the fast growing ceramic sector till now and this research fills the gap in the literature. The literatures surveys reported that organization commitment is an important determinant of retention and work environment, supervisor support and training and development are the most relevant antecedents increasing commitment towards organization. This paper examines the impact of the above factors over organization commitment and explores the effects of organization commitment on retention, and verifies the mediating effect of organization commitment on the relationship between proposed factors and retention. Design/methodology/approach: A survey was completed by 416 employees working in five ceramic sanitary ware factories located at different places in India. Questionnaire consisting of items adopted from previous researches were used to collect data. The selection of respondents was based on the simple random sampling. Findings: Findings reveals that organization commitment influences retention and all the above factors enhances it. Moreover organization commitment partially mediates the relationship between proposed factors and retention. However multiple regression analysis indicated that training and development did not have any notable influence on retention. Limitations: This study was conducted in a particular country and also in a particular sector of manufacturing industry, which limits generalization .Possibility of bias towards their organization and assumption that respondents know about their organization are other limitations. Implications: This paper offers recommendations to HR(Human resource) managers that they should extend their support to work environment, supervisor support and training and development in order to generate better relationship with employees and to reduce their likelihood of leaving the company

  7. Work force retention: Role of work environment, organization commitment, supervisor support and training & development in ceramic sanitary ware industries in India

    Directory of Open Access Journals (Sweden)

    Umamaheswari S

    2016-08-01

    Full Text Available Purpose: Although retention of employees has become hot topic in this career turbulent era, practically no empirical research is carried out in the fast growing ceramic sector till now and this research fills the gap in the literature. The literatures surveys reported that organization commitment is an important determinant of retention and work environment, supervisor support and training and development are the most relevant antecedents increasing commitment towards organization. This paper examines the impact of the above factors over organization commitment and explores the effects of organization commitment on retention, and verifies the mediating effect of organization commitment on the relationship between proposed factors and retention. Design/methodology/approach: A survey was completed by 416 employees working in five ceramic sanitary ware factories located at different places in India. Questionnaire consisting of items adopted from previous researches were used to collect data. The selection of respondents was based on the simple random sampling. Findings: Findings reveals that organization commitment influences retention and all the above factors enhances it. Moreover organization commitment partially mediates the relationship between proposed factors and retention. However multiple regression analysis indicated that training and development did not have any notable   influence on retention. Limitations: This study was conducted in a particular country and also in a particular sector of manufacturing industry, which limits generalization .Possibility of bias towards their organization and assumption that respondents know about their organization are other limitations. Implications: This paper offers recommendations to HR(Human resource managers that they should extend their support to work environment, supervisor support and training and development in order to generate better relationship with employees and to reduce their

  8. Prediction of scour below submerged pipeline crossing a river using ANN.

    Science.gov (United States)

    Azamathulla, H M; Zakaria, Nor Azazi

    2011-01-01

    The process involved in the local scour below pipelines is so complex that it makes it difficult to establish a general empirical model to provide accurate estimation for scour. This paper describes the use of artificial neural networks (ANN) to estimate the pipeline scour depth. The data sets of laboratory measurements were collected from published works and used to train the network or evolve the program. The developed networks were validated by using the observations that were not involved in training. The performance of ANN was found to be more effective when compared with the results of regression equations in predicting the scour depth around pipelines.

  9. Obligatory inquiries concerning buried pipelines in case of intended excavations on private ground; Zur Erkundigungspflicht nach erdverlegten Versorgungsanlagen bei Tiefbauarbeiten auf privaten Grundstuecken

    Energy Technology Data Exchange (ETDEWEB)

    Schulze, O.

    2006-09-15

    If inquiries concerning buried pipelines in case of intended excavations on private ground are neglected, this may have dramatic consequences. As an example, at Griselenghein near Ath, Belgium, excavations damaged the gas pipeline on 30 July 2004, and 18 were killed during the subsequent explosion. The contribution outlines cases in which inquiries concerning buried pipelines in case of intended excavations on private ground are obligatory. It points out regulations that come into force in case of neglect, and the potential contributory negligence of the utility if pipelines are not buried deep enough. (orig.)

  10. 77 FR 6857 - Pipeline Safety: Notice of Public Meetings on Improving Pipeline Leak Detection System...

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... installed to lessen the volume of natural gas and hazardous liquid released during catastrophic pipeline... p.m. Panel 3: Considerations for Natural Gas Pipeline Leak Detection Systems 3:30 p.m. Break 3:45 p...

  11. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  12. 76 FR 303 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2011-01-04

    ... leak detection requirements for all pipelines; whether to require the installation of emergency flow... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 195 [Docket ID PHMSA-2010-0229] RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid...

  13. Mental health of a police force: estimating prevalence of work-related depression in Australia without a direct national measure.

    Science.gov (United States)

    Lawson, Katrina J; Rodwell, John J; Noblet, Andrew J

    2012-06-01

    The risk of work-related depression in Australia was estimated based on a survey of 631 police officers. Psychological wellbeing and psychological distress items were mapped onto a measure of depression to identify optimal cutoff points. Based on a sample of police officers, Australian workers, in general, are at risk of depression when general psychological wellbeing is considerably compromised. Large-scale estimation of work-related depression in the broader population of employed persons in Australia is reasonable. The relatively high prevalence of depression among police officers emphasizes the need to examine prevalence rates of depression among Australian employees.

  14. Addressing the workforce pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  15. Maritimes and northeast pipeline update

    International Nuclear Information System (INIS)

    Langan, P.

    1998-01-01

    Efforts made by Maritimes and Northeast Pipelines to bring the benefits of natural gas to the Maritime's economy was discussed. Some background on the developments that have brought the company to where they are today and an update on all their activities were presented. These activities and operations are expected to impact and affect the region's economy in a positive way. Particular attention was paid to the company's policy on laterals and the positive effects of that policy on the development of natural gas service and future natural gas distribution business in the Maritimes

  16. Feeding the nuclear pipeline: Enabling a global nuclear future

    International Nuclear Information System (INIS)

    Waltar, Alan E.

    2002-01-01

    Full text: There is nothing more vital to the advancement of human civilization than the abundance of usable and affordable energy. It underpins national security, economic prosperity, and global stability. Nuclear energy, which exhibits a unique combination of environmental and sustainable attributes, appears strongly positioned to play a much larger and more pivotal role in the mix of future global energy supplies than it has played in the past. Unfortunately, after a fairly rapid growth period within the industrialized nations in the 1960 to 1980 time frame, a variety of factors led to a substantial reduction in commercial nuclear power plant construction (with the possible exception of several Pacific Rim countries). This, in turn, led to a serious erosion in the enrollment patterns of nuclear engineering programs - causing alarmingly low enrollment levels in many counties by the turn of the century. Numerous studies conducted over the past five years have soberly come to the consistent conclusion that the nuclear pipeline cannot keep up with the needs of the nuclear industry. In fact, when combining the aging work force with low matriculation rates in most nuclear engineering academic programs, a huge (and unacceptable) mismatch between needs and supply is strikingly evident. This is further exasperated by the lack of meaningful efforts to capture the knowledge of the 'first nuclear era' professionals in a form that can be effectively transferred to the upcoming generation. Methods must be found to better capture the enormous body of experience already accumulated and both document it and then mentor the new nuclear engineers that do enter the work force to enable them to build upon this experience, rather than having to re-create it. On the positive side, enrollment patterns in the majority of nuclear engineering programs still in existence within the United States are now generally on the rise, at least at the undergraduate level. Some programs have

  17. Straddling the School-to-Prison Pipeline and Gender Non-Conforming Microaggressions as a Latina Lesbian

    Science.gov (United States)

    Caraves, Jacqueline

    2018-01-01

    Although there is a growing body of work on the experiences of girls in juvenile justice and women in prison, still little is known about the experiences of Latinas in the prison pipeline. Accordingly, even less is known about lesbian/queer Latinas in the prison pipeline. Gabriela's case study reveals her experiences in and out of the Juvenile…

  18. Earthquake resistant countermeasures for pipelines in Tokyo gas F.T.R.L.; Etude menee par l'institut de recherches de Tokyo gas et portant sur les mesures antisismiques applicables aux canalisations

    Energy Technology Data Exchange (ETDEWEB)

    Kobayashi, M.; Hosokawa, N.; Watanabe, T. [Tokyo Gas Fundamental Technology Research Lab. (Japan)

    2000-07-01

    Taking 'damage factor', 'ground response', 'soil pipe interaction', and 'deformability of pipes' as its four key concerns, Tokyo Gas F.T.R.L. is working to clarify the behavior of pipelines during strong earthquakes and improve their earthquake resistance to increase safety levels. In specific terms, Tokyo Gas F.T.R.L. has sought to contribute to earthquake resistance by, for example, conducting pipeline damage forecasts, FEM dynamic response analyses to quantify ground amplification, empirical and analytic studies of forces acting on pipelines, various vibration tests, and tests to determine the deforming behavior of pipes. A further important concern given the limited resources available is the prioritization of the pipes to be made more earthquake resistant. Ultimately, these studies should contribute to more rational and effective seismic design of pipelines and improvement of earthquake resistance both in the case of existing and new facilities and equipment. (authors)

  19. The Work-to-College Transition: Postsecondary Expectations and Enrolment for Young Men and Women in the US Labour Force

    Science.gov (United States)

    Wells, Ryan S.; Bills, David B.; Devlin, Maura E.

    2014-01-01

    This paper investigates early employment influences on postsecondary expectations and enrolment for working men and women who have recently completed high school in the United States. We find that young workers still have very high expectations for postsecondary education, but that women are more likely to enrol. However, this difference is…

  20. The Effects on the Structure of Society of the Growing Number of Women in the Work Force.

    Science.gov (United States)

    Cook, Alice H.

    Women's participation in the workforce is increasing, spurred by inflation, the rising level of consumer aspirations, the increasing number of families headed by women as a consequence of divorce, and the declining birth rate. However, the work women do continues to be segregated from men's and comparatively poorly paid, while women still carry…

  1. [Trends of work force participation of patients with rheumatic diseases : results from German social insurance data and the national database of the German collaborative arthritis centers].

    Science.gov (United States)

    Mau, W; Thiele, K; Lamprecht, J

    2014-02-01

    Positive therapeutic effects on the work force participation derived from international clinical trials may not be directly transferable to the community based care in Germany. Therefore recent changes of data regarding sick leave (SL), work disability pension (WDP) and employment from the social insurance and from the national database of the German collaborative arthritis centers were analyzed covering a time period of at least 10 years. Health insurance data showed a steeper decline in the average duration of SL caused by rheumatoid arthritis (RA), ankylosing spondylitis (AS) and systemic lupus erythematosus (SLE) compared with all other diseases. In RA patients from the collaborative arthritis centers the mean duration of SL was much more reduced than the average duration of SL for members of the compulsory health insurance. The proportion of gainfully employed RA patients in collaborative arthritis centers has particularly increased in women. According to data from the pension insurance fund less incident cases of WDP due to RA, AS, and SLE have been observed than WDP caused by all other diseases. Thus different nationwide data show positive changes of the work force participation of individuals suffering from inflammatory rheumatic diseases in Germany.

  2. Internal corrosion control of northern pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Papavinasam, S.

    2005-02-01

    The general causes of internal corrosion in pipelines were discussed along with the methods to control them. Efficient methods are needed to determine chemical efficiency for mitigating internal corrosion in transmission pipelines, particularly those used in environmentally sensitive regions in the Arctic where harsh environmental conditions prevail. According to the Office of Pipeline Safety, 15 per cent of pipeline failures in the United States from 1994 to 2000 were caused by internal corrosion. Since pipelines in the United States are slightly older than Canadian pipelines, internal corrosion is a significant issue from a Canadian perspective. There are 306,618 km of energy-related pipelines in western Canada. Between April 2001 and March 2002 there were 808 failures, of which 425 failures resulted from internal corrosion. The approach to control internal corrosion comprises of dehydrating the gases at production facilities; controlling the quality of corrosive gases such as carbon dioxide and hydrogen sulphide; and, using internal coatings. The approaches to control internal corrosion are appropriate, when supplemented by adequate integrity management program to ensure that corrosive liquids do not collect, over the operational lifetime of the pipelines, at localized areas. It was suggested that modeling of pipeline operations may need improvement. This paper described the causes, prediction and control of internal pitting corrosion. It was concluded that carbon steel equipment can continue to be used reliably and safely as pipeline materials for northern pipelines if the causes that lead to internal corrosion are scientifically and accurately predicted, and if corrosion inhibitors are properly evaluated and applied. 5 figs.

  3. Theoretical Analysis of Unit Friction Force Working on the Metal Contact Surface with the Roll Change during Feedstock with Non-Uniform Temperature Distribution Rolling Process

    Directory of Open Access Journals (Sweden)

    Sygut P.

    2016-06-01

    Full Text Available The paper presents the results of theoretical studies influence of non-uniform temperature distribution along the feedstock length to the unit friction force working on the metal contact surface with the roll change during the round bars 70 mm in diameter continuous rolling process. This value is one of the major factors affecting the grooves wear during the rolling process. The studies were carried out based on the actual engineering data for 160 × 160 mm square cross-section feedstock of steel S355J0. Numerical modelling of the rolling process was performed using Forge2008®, a finite-element based computer program.

  4. Residue management in the Bolivia-Brazil gas pipeline construction

    International Nuclear Information System (INIS)

    Freitas, Eduardo Lopes; Henrique, Paulo Roberto Pereira; Cantarino, Anderson Americo Alves

    2000-01-01

    The construction of the gas pipeline is a process sequential of assembly phases, where each one of those phases generates residues of the most varied types and amounts, being necessary the forecast of your generation in agreement with the activity that is being executed. During the accomplishment of the works they are generated a lot of times situations where are observed the inadequate disposition of the residues. Those practices, besides the environmental impact that they cause, it can cart in the future, the need of additional investments be proceeded in the recovery of the areas and removal of the residues. This work presents the Program of administration of Residues instituted during the construction of the pipeline Bolivia - Brazil, seeking, on a side to reduce to the minimum the generation of residues and of the other, moths handling guidelines and disposition, in way to minimize the environmental impacts caused by the same ones. (author)

  5. Including district heating pipelines in absolute liability laws

    Energy Technology Data Exchange (ETDEWEB)

    Gronau, W

    1977-10-01

    On January 1, 1978 the provisions of the Act Amending the Rules of Liability Damages have entered into force. Formally this means that the provisions of the Reich Liability Act (Reichshaftpflichtgesetz, RHG) and those of the Act on Liability with Respect to Property Damage of Railways and Tramways (SHG) are now combined under the new term of Liability Act (Haftpflichtgesetz). In material terms it means that the district heat industry with its supply pipelines is subject to absolute liability. This creates a liability situation for this industry which has been existing for the electricity and gas industries since 1943 as a result of an amendment of the Reich Liability Act.

  6. Energy-related scientists and engineers: a statistical profile of recent entrants into the work force, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Bell, Sharon E.

    1979-12-01

    This report examines the educational and employment characteristics of scientists and engineers who graduated during the years 1972, 1974, 1975, and 1976, with special attention to those whose work involves energy. The characteristics of energy-related graduates are also compared to those of more experienced scientists and engineers involved in energy activities. Information is based on the results of the 1976 and 1978 National Surveys of Recent Science and Engineering Graduates, and the 1976 National Survey of Natural and Social Scientists and Engineers, sponsored by the National Science Foundation and the US Department of Energy. Tabulations are included for the first time on employment involving specific energy sources and activities. Other characteristics discussed include educational level, salary, primary work activity, type of employer, and the proportion of graduates who found employment in their major field.

  7. 78 FR 24309 - Pipeline and Hazardous Materials Safety Administration

    Science.gov (United States)

    2013-04-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration List of Special Permit Applications Delayed AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...

  8. Oil and Natural Gas Pipelines, North America, 2010, Platts

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Oil and Natural Gas Pipeline geospatial data layer contains gathering, interstate, and intrastate natural gas pipelines, crude and product oil pipelines, and...

  9. 75 FR 32836 - Pipeline Safety: Workshop on Public Awareness Programs

    Science.gov (United States)

    2010-06-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... American Public Gas Association Association of Oil Pipelines American Petroleum Institute Interstate... the pipeline industry). Hazardous Liquid Gas Transmission/Gathering Natural Gas Distribution (10...

  10. 75 FR 67807 - Pipeline Safety: Emergency Preparedness Communications

    Science.gov (United States)

    2010-11-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities... Gas Pipeline Systems. Subject: Emergency Preparedness Communications. Advisory: To further enhance the...

  11. 76 FR 65778 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-10-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: 12,120. Frequency of Collection: On occasion. 2. Title: Recordkeeping for Natural Gas Pipeline... investigating incidents. Affected Public: Operators of natural gas pipeline systems. Annual Reporting and...

  12. 75 FR 13807 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200 New Jersey Avenue, SE...: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements (One Rule). The Notice of Proposed...

  13. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public.... Background Federal regulations for gas, liquefied natural gas (LNG), and hazardous liquid pipeline facilities...

  14. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... notice provides clarification to owners and operators of gas distribution pipeline facilities when... of a gas distribution pipeline facility to file a written report for any mechanical fitting failure...

  15. Forced-Choice Assessment of Work-Related Maladaptive Personality Traits: Preliminary Evidence From an Application of Thurstonian Item Response Modeling.

    Science.gov (United States)

    Guenole, Nigel; Brown, Anna A; Cooper, Andrew J

    2018-06-01

    This article describes an investigation of whether Thurstonian item response modeling is a viable method for assessment of maladaptive traits. Forced-choice responses from 420 working adults to a broad-range personality inventory assessing six maladaptive traits were considered. The Thurstonian item response model's fit to the forced-choice data was adequate, while the fit of a counterpart item response model to responses to the same items but arranged in a single-stimulus design was poor. Monotrait heteromethod correlations indicated corresponding traits in the two formats overlapped substantially, although they did not measure equivalent constructs. A better goodness of fit and higher factor loadings for the Thurstonian item response model, coupled with a clearer conceptual alignment to the theoretical trait definitions, suggested that the single-stimulus item responses were influenced by biases that the independent clusters measurement model did not account for. Researchers may wish to consider forced-choice designs and appropriate item response modeling techniques such as Thurstonian item response modeling for personality questionnaire applications in industrial psychology, especially when assessing maladaptive traits. We recommend further investigation of this approach in actual selection situations and with different assessment instruments.

  16. [24-hour work: the interaction of stress and changes in the sleep-wake cycle in the police force].

    Science.gov (United States)

    Garbarino, Sergio

    2014-01-01

    Disruption in police officers. In recent years there has been a widespread growth in services, available regardless of time or day organization (24/7 service) and a diffuse increase in their use, both in work and private lives, generally ignoring the importance of a regular sleep organization. Police officers - often need to work extended shifts and long hours under highly stressful conditions, which results in reduced levels of safety and operational effectiveness. In numerous studies, perceived stress has been found to correlate with both subjective and objective disturbances in sleep. Consequently, excessive daytime sleepiness is one of the most frequent health and safety hazards that police officers have to deal with. Sleep deprivation affects performance outcomes through a wide range of cognitive domains. Sleepiness and fatigue, caused by sleep loss, extended work and wakefulness, circadian misalignment and sleep disorders are major causes of workplace human errors, incidents, and accidents. Therefore, prevention of sleep loss, high levels of stress and fatigue is a key factor to consider when assessing emergency intervention. In order to combat fatigue and sleepiness, a 30-90 minutes nap before night shift could be a viable option.

  17. Software for pipeline integrity administration

    Energy Technology Data Exchange (ETDEWEB)

    Soula, Gerardo; Perona, Lucas Fernandez [Gie SA., Buenos Aires (Argentina); Martinich, Carlos [Refinaria do Norte S. A. (REFINOR), Tartagal, Provincia de Salta (Argentina)

    2009-07-01

    A Software for 'pipeline integrity management' was developed. It allows to deal with Geographical Information and a PODS database (Pipeline Open database Standard) simultaneously, in a simple and reliable way. The premises for the design were the following: didactic, geo referenced, multiple reference systems. Program skills: 1.PODS+GIS: the PODS database in which the software is based on is completely integrated with the GIS module. 2 Management of different kinds of information: it allows to manage information on facilities, repairs, interventions, physical inspections, geographical characteristics, compliance with regulations, training, offline events, operation measures, O and M information treatment and importing specific data and studies in a massive way. It also assures the integrity of the loaded information. 3 Right of way survey: it allows to verify the class location, ROW occupation, sensitive areas identification and to manage landowners. 4 Risk analysis: it is done in a qualitative way, depending on the entered data, allowing the user to identify the riskiest stretches of the system. Either results from risk analysis, data and consultations made about the database, can be exported to standard formats. (author)

  18. System reliability of corroding pipelines

    International Nuclear Information System (INIS)

    Zhou Wenxing

    2010-01-01

    A methodology is presented in this paper to evaluate the time-dependent system reliability of a pipeline segment that contains multiple active corrosion defects and is subjected to stochastic internal pressure loading. The pipeline segment is modeled as a series system with three distinctive failure modes due to corrosion, namely small leak, large leak and rupture. The internal pressure is characterized as a simple discrete stochastic process that consists of a sequence of independent and identically distributed random variables each acting over a period of one year. The magnitude of a given sequence follows the annual maximum pressure distribution. The methodology is illustrated through a hypothetical example. Furthermore, the impact of the spatial variability of the pressure loading and pipe resistances associated with different defects on the system reliability is investigated. The analysis results suggest that the spatial variability of pipe properties has a negligible impact on the system reliability. On the other hand, the spatial variability of the internal pressure, initial defect sizes and defect growth rates can have a significant impact on the system reliability.

  19. STRESS AND STRAIN STATE OF REPAIRING SECTION OF PIPELINE

    Directory of Open Access Journals (Sweden)

    V. V. Nikolaev

    2015-01-01

    Full Text Available Reliability of continuous operation of pipelines is an actual problem. For this reason should be developed an effective warning system of the main pipelines‘  failures and accidents not only in design and operation but also in selected repair. Changing of linear, unloaded by bending position leads to the change of stress and strain state of pipelines. And besides this, the stress and strain state should be determined and controlled in the process of carrying out the repair works. The article presents mathematical model of pipeline’s section straining in viscoelastic setting taking into account soils creep and high-speed stress state of pipeline with the purpose of stresses evaluation and load-supporting capacity of repairing section of pipeline, depending on time.  Stress and strain state analysis of pipeline includes longitudinal and circular stresses calculation  with  account of axis-asymmetrical straining and  was  fulfilled  on  the base of momentless theory of shells. To prove the consistency of data there were compared the calcu- lation results and the solution results by analytical methods for different cases (long pipeline’s section strain only under influence of cross-axis action; long pipeline’s section strain under in- fluence of longitudinal stress; long pipeline’s section strain; which is on the elastic foundation, under influence of cross-axis action. Comparison results shows that the calculation error is not more than 3 %.Analysis of stress-strain state change of pipeline’s section was carried out with development  of  this  model,  which  indicates  the  enlargement  of  span  deflection  in  comparison with problem’s solution in elastic approach. It is also proved, that for consistent assessment of pipeline maintenance conditions, it is necessary to consider the areolas of rheological processes of soils. On the base of complex analysis of pipelines there were determined stresses and time

  20. Software development to estimate the leaked volume from ruptured submarine pipelines; Desenvolvimento de um software para estimativa do volume vazado a partir de dutos submarions rompidos

    Energy Technology Data Exchange (ETDEWEB)

    Quadri, Marintho B.; Machado, Ricardo A.F.; Nogueira, Andre L.; Lopes, Toni J. [Universidade Federal de Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Quimica; Baptista, Renan M. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas (CENPES)

    2004-07-01

    The considerable increasing in the world petroleum consumption as the exhaustion of onshore reserves in the last decades leads the companies to exploit petroleum in offshore reserves (both shallow and deep water). As in onshore operations, accidents may also occur in submarine exploration. Leaking from submarine pipelines arises from corrosion pit and from axial or radial breakage. In all these three situations, the leaking is divided in three steps: pipeline depressurization until the internal pressure becomes equal to the external one; advective migration in which the driven force is the difference in the physical properties of the fluids; oil spill movement in the sea surface. A great number of mathematical models are Also available for the first and third steps. For the second one and theoretically, the most important situation, there is a restricted number of works respected to the oil volume leaked. The present study presents a software that is capable to accurate simulate a leakage through the advective migration phenomena. The software was validated for situations for different holes radii located in the upper side of a horizontal pipeline. Model results presented very good agreement with experimental data. (author)

  1. Integrated natural gas pipeline control and customer service system of Gasum; Le systeme integre de controle des canalisations de gaz et de service au consommateur chez Gasum

    Energy Technology Data Exchange (ETDEWEB)

    Aho, J.; Manty, O.; Ahlnas, B. [Gasul Oy (Finland)

    2000-07-01

    Due to the rapid development of the information technology, ageing is not the only driving force for replacing old computer systems with more sophisticated ones. The Finnish natural Gas company, Gasum Oy, has recently taken into use a new control and monitoring system for natural gas pipeline. A special customer service system, developed by Gasum Oy, is closely connected to monitoring system. It provides up-to-date information to all customers of Gasum Oy. The information is layered in three confidential levels: general information, operational data and invoicing information. The system is operating interactively in confidential Extranet. Inside Gasum Oy to meet the needs of departments outside the control room, a new GID system is developed. GID is a way to present pipeline process data and its further modifications with a very user-friendly interface based on geographical map. The system is based on data warehouse architecture and it is working on company's Intranet. This makes it possible to present various secrecy level information based on user ID. Gasum's new SCADA is not only the base for operating the pipeline, but it also provides lot of vital information to other systems serving different user groups within natural gas business in Finland. (authors)

  2. A Secure Test Technique for Pipelined Advanced Encryption Standard

    Science.gov (United States)

    Shi, Youhua; Togawa, Nozomu; Yanagisawa, Masao; Ohtsuki, Tatsuo

    In this paper, we presented a Design-for-Secure-Test (DFST) technique for pipelined AES to guarantee both the security and the test quality during testing. Unlike previous works, the proposed method can keep all the secrets inside and provide high test quality and fault diagnosis ability as well. Furthermore, the proposed DFST technique can significantly reduce test application time, test data volume, and test generation effort as additional benefits.

  3. Technical Aspect on Procedure of Gamma-Ray Pipeline Inspection

    International Nuclear Information System (INIS)

    Rasif Mohd Zain; Ainul Mardhiah Terry; Norman Shah Dahing

    2015-01-01

    The main problems happen in industrial pipelines are deposit build-up, blockage, corrosion and erosion. These effects will give a constraint in transporting refined products to process or production points and cause a major problem in production. One of the techniques to inspect the problem is using gamma-ray pipe scans. The principle of the technique is gamma-ray absorption technique. In this paper describes on the technical aspect to perform the pipe inspection in laboratory work. (author)

  4. Angra II pipelines and supports data base sources (GPT)

    International Nuclear Information System (INIS)

    Abud, Paulo Roberto; Grand Court, Eduardo Souza de

    1995-01-01

    The analysis of the needs related to the management of assembly of pipelines and support system in a nuclear power plant presents a great deal of data. Such situation leaded to the development of a data base named Erection Management System, EMS, which enables not only the assembly of the equipment, but also the management of the project in addition to monitoring all the activities related to assembly. This work discusses the above mentioned issues

  5. DURABILITY-RELATED CHARACTERISTICS OF DOUBLE-LAYER STRUCTURES OF PIPELINES CONNECTED TO POLYMERIC SLEEVES

    Directory of Open Access Journals (Sweden)

    Orlov Vladimir Alexandrovich

    2012-10-01

    The ultimate objective of the software programme is to assess the applicability of the trenchless repair method involving a polymeric sleeve in each specific case by taking account of the environment and the condition of the pipeline. The software is also capable of developing the requirements to be fulfilled by subcontractors in order to assure the appropriate quality of any repair work performed and the reliability of any pipeline sections repaired.

  6. Analysis of several ways to minimize the scatter contribution in radiographic digital images of offshore pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Edmilson M.; Silva, Ademir X.; Lopes, Ricardo T., E-mail: emonteiro@nuclear.ufrj.b, E-mail: ademir@nuclear.ufrj.b, E-mail: Ricardo@lin.ufrj.b [Coordenacao dos Programas de Pos-Graduacao de Engenharia (PEN/COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear; Correa, Samanda C.A., E-mail: scorrea@cnen.gov.b [Comissao Nacional de Energia Nuclear (DIAPI/CGMI/CNEN), Rio de Janeiro, RJ (Brazil). Coordenacao Geral de Instalacoes Medicas e Industriais. Div. de Aplicacoes Industriais

    2011-07-01

    The aim of this work is to evaluate, through MCNPX simulations, several ways to minimize the scatter contribution in radiographic digital images of offshore pipelines. The influence of liquid inside the pipes and water surrounded the pipelines in the scatter contribution will be analyzed. The use of lead screen behind the detector to reduce the backscattered radiation and filter between the radiation source and the pipes will be discussed. (author)

  7. Analysis of several ways to minimize the scatter contribution in radiographic digital images of offshore pipelines

    International Nuclear Information System (INIS)

    Souza, Edmilson M.; Silva, Ademir X.; Lopes, Ricardo T.; Correa, Samanda C.A.

    2011-01-01

    The aim of this work is to evaluate, through MCNPX simulations, several ways to minimize the scatter contribution in radiographic digital images of offshore pipelines. The influence of liquid inside the pipes and water surrounded the pipelines in the scatter contribution will be analyzed. The use of lead screen behind the detector to reduce the backscattered radiation and filter between the radiation source and the pipes will be discussed. (author)

  8. Dynamic pressure measures for long pipeline leak detection

    Energy Technology Data Exchange (ETDEWEB)

    Likun Wang; Hongchao Wang; Min Xiong; Bin Xu; Dongjie Tan; Hengzhang Zhou [PetroChina Pipeline Company, Langfang (China). R and D Center

    2009-07-01

    Pipeline leak detection method based on dynamic pressure is studied. The feature of dynamic pressure which is generated by the leakage of pipeline is analyzed. The dynamic pressure method is compared with the static pressure method for the advantages and disadvantages in pipeline leak detection. The dynamic pressure signal is suitable for pipeline leak detection for quick-change of pipeline internal pressure. Field tests show that the dynamic pressure method detects pipeline leak rapidly and precisely. (author)

  9. Complex myograph allows the examination of complex muscle contractions for the assessment of muscle force, shortening, velocity, and work in vivo

    Directory of Open Access Journals (Sweden)

    Ruhschulte Hainer

    2008-07-01

    Full Text Available Abstract Background The devices used for in vivo examination of muscle contractions assess only pure force contractions and the so-called isokinetic contractions. In isokinetic experiments, the extremity and its muscle are artificially moved with constant velocity by the measuring device, while a tetanic contraction is induced in the muscle, either by electrical stimulation or by maximal voluntary activation. With these systems, experiments cannot be performed at pre-defined, constant muscle length, single contractions cannot be evaluated individually and the separate examination of the isometric and the isotonic components of single contractions is not possible. Methods The myograph presented in our study has two newly developed technical units, i.e. a. a counterforce unit which can load the muscle with an adjustable, but constant force and b. a length-adjusting unit which allows for both the stretching and the contraction length to be infinitely adjustable independently of one another. The two units support the examination of complex types of contraction and store the counterforce and length-adjusting settings, so that these conditions may be accurately reapplied in later sessions. Results The measurement examples presented show that the muscle can be brought to every possible pre-stretching length and that single isotonic or complex isometric-isotonic contractions may be performed at every length. The applied forces act during different phases of contraction, resulting into different pre- and after-loads that can be kept constant – uninfluenced by the contraction. Maximal values for force, shortening, velocity and work may be obtained for individual muscles. This offers the possibility to obtain information on the muscle status and to monitor its changes under non-invasive measurement conditions. Conclusion With the Complex Myograph, the whole spectrum of a muscle's mechanical characteristics may be assessed.

  10. The MIRI Medium Resolution Spectrometer calibration pipeline

    NARCIS (Netherlands)

    Labiano, A.; Azzollini, R.; Bailey, J.; Beard, S.; Dicken, D.; García-Marín, M.; Geers, V.; Glasse, A.; Glauser, A.; Gordon, K.; Justtanont, K.; Klaassen, P.; Lahuis, F.; Law, D.; Morrison, J.; Müller, M.; Rieke, G.; Vandenbussche, B.; Wright, G.

    2016-01-01

    The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer (MRS) is the only mid-IR Integral Field Spectrometer on board James Webb Space Telescope. The complexity of the MRS requires a very specialized pipeline, with some specific steps not present in other pipelines of JWST instruments,

  11. Oil pipeline energy consumption and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Hooker, J.N.

    1981-01-01

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movements over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.

  12. Testing the School-to-Prison Pipeline

    Science.gov (United States)

    Owens, Emily G.

    2017-01-01

    The School-to-Prison Pipeline is a social phenomenon where students become formally involved with the criminal justice system as a result of school policies that use law enforcement, rather than discipline, to address behavioral problems. A potentially important part of the School-to-Prison Pipeline is the use of sworn School Resource Officers…

  13. Generating pipeline networks for corrosion assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, J. [Cimarron Engineering Ltd., Calgary, AB (Canada)

    2008-07-01

    Production characteristics and gas-fluid compositions of fluids must be known in order to assess pipelines for internal corrosion risk. In this study, a gathering system pipeline network was built in order to determine corrosion risk for gathering system pipelines. Connections were established between feeder and collector lines in order measure upstream production and the weighted average of the upstream composition of each pipeline in the system. A Norsok M-506 carbon dioxide (CO{sub 2}) corrosion rate model was used to calculate corrosion rates. A spreadsheet was then used to tabulate the obtained data. The analysis used straight lines drawn between the 'from' and 'to' legal sub-division (LSD) endpoints in order to represent pipelines on an Alberta township system (ATS) and identify connections between pipelines. Well connections were established based on matching surface hole location and 'from' LSDs. Well production, composition, pressure, and temperature data were sourced and recorded as well attributes. XSL hierarchical computations were used to determine the production and composition properties of the commingled inflows. It was concluded that the corrosion assessment process can identify locations within the pipeline network where potential deadlegs branched off from flowing pipelines. 4 refs., 2 tabs., 2 figs.

  14. Analysis of buried pipelines at Kozloduy

    International Nuclear Information System (INIS)

    Asfura, A.

    1999-01-01

    This paper describes the analysis of the buried pipelines at Kozloduy NPP. It involves the description of the studied pipelines, their properties, a detailed description of the methodology applied, and the evaluation of the soil strain field as well as the graphical representation of the results obtained

  15. Repairing method for reactor primary system pipeline

    International Nuclear Information System (INIS)

    Hosokawa, Hideyuki; Uetake, Naoto; Hara, Teruo.

    1997-01-01

    Pipelines after decontamination of radioactive nuclides deposited on the pipelines in a nuclear power plant during operation or pipelines to replace pipelines deposited with radioactive nuclide are connected to each system of the nuclear power plant. They are heated in a gas phase containing oxygen to form an oxide film on the surface of the pipelines. The thickness of the oxide film formed in the gas phase is 1nm or greater, preferably 100nm. The concentration of oxygen in the gas phase containing oxygen must be 0.1% or greater. The heating is conducted by circulating a heated gas to the inside of the pipelines or disposing a movable heater such as a high frequency induction heater inside of the pipelines to form the oxide film. Then, redeposition of radioactive nuclide can be suppressed and since the oxide film is formed in the gas phase, a large scaled facilities are not necessary, thereby enabling to repair pipelines of reactor primary system at low cost. (N.H.)

  16. Protection of pipelines affected by surface subsidence

    International Nuclear Information System (INIS)

    Luo, Y.; Peng, S.S.; Chen, H.J.

    1998-01-01

    Surface subsidence resulting from underground coal mining can cause problems for buried pipelines. A technique for assessing the level of stress on a subsidence-affected pipeline is introduced. The main contributors to the stress are identified, and mitigation techniques for reducing the stress are proposed. The proposed mitigation techniques were then successfully tested. 13 refs., 8 figs., 2 tabs

  17. The development of the strategy and plan for the decommissioning and abandonment of 36'' offshore oil export pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Richard J. [PIMS of London Ltd, London, (United Kingdom); Galvez Reyes, Marco Antonio [PEMEX Refinacion, Veracruz, (Mexico)

    2010-07-01

    The decommissioning and abandonment of platforms and pipelines are big challenges for the pipeline industry. This paper presents a review of the decommissioning and abandonment processes based on a study case, the Rabon Grande pipeline system. First, the applicable international codes, standards and regulations associated with the decommissioning of pipelines are discussed. Next, this paper presents a review of the decommissioning and abandonment options and considerations available for the study case. The Rabon Grande pipeline system, which was shut down and isolated in 1990 pending decommissioning, is used as an example of applying decommissioning and abandonment best practice and establishing a realistic scope of work. A decommissioning plan is developed in light of these previous studies, followed by an environmental impact assessment. It is found that contrary to what was done in the case of the Rabon Grande pipeline, when a pipeline is to be shutdown, the best practice methodology is to temporally or fully decommission the system as soon as possible.

  18. System of maintenance of sustainability of oil pipelines

    International Nuclear Information System (INIS)

    Aleskerov, R.

    2005-01-01

    Full text : Development of the ecological science defining interrelation and interaction of system of an alive and lifeless matter, opens new opportunities and decisions of a problem of system maintenance of stability of oil pipelines and other engineering constructions and devices of strategic purpose. In work the methodology of system maintenance of stability of oil pipelines is resulted. It is known, that at transport of oil and gas a plenty of automatic and electronic devices, devices are applied to the control and the signal system of parameters of dangerous and harmful factors, a condition of the technological and test equipment, diagnostics and the control of pipelines. The control of parameters of safety of an oil pipeline over the operation, considering influence of heavy climatic conditions during all line, etc. (1, 2, 3) is carried out. Therefore stability of work of various parts of system of an oil pipeline depends on reliability and accuracy of work of devices and devices. However, thus influence of variations of geomagnetic fields and the geodynamic processes breaking the indications of devices and devices which lead to infringement reliability of all design of system of an oil pipeline is not considered. In turn, specified leads to failure, lost of human and natural resources. Now, according to the accepted methodology of a safety of working conditions, potential dangers of any activity, only person, with the subsequent development of measures of protection (4) are considered. Proceeding from it all surrounding material world shares on the following objects forming in aggregate working conditions: subjects of work.; means of production; products of work; the industrial environment; technology process; an environmental-climatic complex; fauna and flora; people (work of the person). Apparently from above resulted, in the accepted methodology potential dangers of any activity of the person and corresponding environmental -climatic conditions of the

  19. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_vectors_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the lines of the pipeline in the GOM. All pipelines existing in the databases...

  20. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_points_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the points of the pipeline in the GOM. All pipelines existing in the databases...

  1. Pipeline monitoring with unmanned aerial vehicles

    Science.gov (United States)

    Kochetkova, L. I.

    2018-05-01

    Pipeline leakage during transportation of combustible substances leads to explosion and fire thus causing death of people and destruction of production and accommodation facilities. Continuous pipeline monitoring allows identifying leaks in due time and quickly taking measures for their elimination. The paper describes the solution of identification of pipeline leakage using unmanned aerial vehicles. It is recommended to apply the spectral analysis with input RGB signal to identify pipeline damages. The application of multi-zone digital images allows defining potential spill of oil hydrocarbons as well as possible soil pollution. The method of multi-temporal digital images within the visible region makes it possible to define changes in soil morphology for its subsequent analysis. The given solution is cost efficient and reliable thus allowing reducing timing and labor resources in comparison with other methods of pipeline monitoring.

  2. Crude oil growth impact on pipelines

    International Nuclear Information System (INIS)

    Devries, O.

    2005-01-01

    This paper provided an outline of crude oil production and supply in Canada. Details of oil sands projects in Athabasca, Cold Lake and Peace River were presented. A chart of oil sands growth by major project was provided. A list of new emerging oil sands crude types was also presented along with details of a synthetic bitumen blending synergy. Maps of Western Canadian crude oil markets were provided, along with details of refinery and market demand by crude type. Various pipeline alternatives to new markets were examined, with reference to Enbridge Pipeline's supply and capacity. Details of the Hardisty to U.S Gulf Coast Pipeline and the Edmonton to Prince Rupert Pipeline and its terminal and dock facilities were presented. It was concluded that pipeline capacity and seasonal factors will influence market demand, while linefill, crude types and the quality of the product will influence operational strategies. tabs., figs

  3. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  4. Efficiency improvements in pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.; Horton, J. F.

    1977-09-09

    This report identifies potential energy-conservative pipeline innovations that are most energy- and cost-effective and formulates recommendations for the R, D, and D programs needed to exploit those opportunities. From a candidate field of over twenty classes of efficiency improvements, eight systems are recommended for pursuit. Most of these possess two highly important attributes: large potential energy savings and broad applicability outside the pipeline industry. The R, D, and D program for each improvement and the recommended immediate next step are described. The eight technologies recommended for R, D, and D are gas-fired combined cycle compressor station; internally cooled internal combustion engine; methanol-coal slurry pipeline; methanol-coal slurry-fired and coal-fired engines; indirect-fired coal-burning combined-cycle pump station; fuel-cell pump station; drag-reducing additives in liquid pipelines; and internal coatings in pipelines.

  5. Pipeline modeling and assessment in unstable slopes

    Energy Technology Data Exchange (ETDEWEB)

    Caceres, Carlos Nieves [Oleoducto Central S.A., Bogota, Cundinamarca (Colombia); Ordonez, Mauricio Pereira [SOLSIN S.A.S, Bogota, Cundinamarca (Colombia)

    2010-07-01

    The OCENSA pipeline system is vulnerable to geotechnical problems such as faults, landslides or creeping slopes, which are well-known in the Andes Mountains and tropical countries like Colombia. This paper proposes a methodology to evaluate the pipe behaviour during the soil displacements of slow landslides. Three different cases of analysis are examined, according to site characteristics. The process starts with a simplified analytical model and develops into 3D finite element numerical simulations applied to the on-site geometry of soil and pipe. Case 1 should be used when the unstable site is subject to landslides impacting significant lengths of pipeline, pipeline is straight, and landslide is simple from the geotechnical perspective. Case 2 should be used when pipeline is straight and landslide is complex (creeping slopes and non-conventional stabilization solutions). Case 3 should be used if the pipeline presents vertical or horizontal bends.

  6. Location of leaks in pressurized underground pipelines

    International Nuclear Information System (INIS)

    Eckert, E.G.; Maresca, J.W. Jr.

    1993-01-01

    Millions of underground storage tanks (UST) are used to store petroleum and other chemicals. The pressurized underground pipelines associated with USTs containing petroleum motor fuels are typically 2 in. in diameter and 50 to 200 ft in length. These pipelines typically operate at pressures of 20 to 30 psi. Longer lines, with diameters up to 4 in., are found in some high-volume facilities. There are many systems that can be used to detect leaks in pressurized underground pipelines. When a leak is detected, the first step in the remediation process is to find its location. Passive-acoustic measurements, combined with advanced signal-processing techniques, provide a nondestructive method of leak location that is accurate and relatively simple, and that can be applied to a wide variety of pipelines and pipeline products

  7. Magnetic Flux Leakage and Principal Component Analysis for metal loss approximation in a pipeline

    International Nuclear Information System (INIS)

    Ruiz, M; Mujica, L E; Quintero, M; Florez, J; Quintero, S

    2015-01-01

    Safety and reliability of hydrocarbon transportation pipelines represent a critical aspect for the Oil an Gas industry. Pipeline failures caused by corrosion, external agents, among others, can develop leaks or even rupture, which can negatively impact on population, natural environment, infrastructure and economy. It is imperative to have accurate inspection tools traveling through the pipeline to diagnose the integrity. In this way, over the last few years, different techniques under the concept of structural health monitoring (SHM) have continuously been in development.This work is based on a hybrid methodology that combines the Magnetic Flux Leakage (MFL) and Principal Components Analysis (PCA) approaches. The MFL technique induces a magnetic field in the pipeline's walls. The data are recorded by sensors measuring leakage magnetic field in segments with loss of metal, such as cracking, corrosion, among others. The data provide information of a pipeline with 15 years of operation approximately, which transports gas, has a diameter of 20 inches and a total length of 110 km (with several changes in the topography). On the other hand, PCA is a well-known technique that compresses the information and extracts the most relevant information facilitating the detection of damage in several structures. At this point, the goal of this work is to detect and localize critical loss of metal of a pipeline that are currently working. (paper)

  8. Magnetic Flux Leakage and Principal Component Analysis for metal loss approximation in a pipeline

    Science.gov (United States)

    Ruiz, M.; Mujica, L. E.; Quintero, M.; Florez, J.; Quintero, S.

    2015-07-01

    Safety and reliability of hydrocarbon transportation pipelines represent a critical aspect for the Oil an Gas industry. Pipeline failures caused by corrosion, external agents, among others, can develop leaks or even rupture, which can negatively impact on population, natural environment, infrastructure and economy. It is imperative to have accurate inspection tools traveling through the pipeline to diagnose the integrity. In this way, over the last few years, different techniques under the concept of structural health monitoring (SHM) have continuously been in development. This work is based on a hybrid methodology that combines the Magnetic Flux Leakage (MFL) and Principal Components Analysis (PCA) approaches. The MFL technique induces a magnetic field in the pipeline's walls. The data are recorded by sensors measuring leakage magnetic field in segments with loss of metal, such as cracking, corrosion, among others. The data provide information of a pipeline with 15 years of operation approximately, which transports gas, has a diameter of 20 inches and a total length of 110 km (with several changes in the topography). On the other hand, PCA is a well-known technique that compresses the information and extracts the most relevant information facilitating the detection of damage in several structures. At this point, the goal of this work is to detect and localize critical loss of metal of a pipeline that are currently working.

  9. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  10. An integrated SNP mining and utilization (ISMU) pipeline for next generation sequencing data.

    Science.gov (United States)

    Azam, Sarwar; Rathore, Abhishek; Shah, Trushar M; Telluri, Mohan; Amindala, BhanuPrakash; Ruperao, Pradeep; Katta, Mohan A V S K; Varshney, Rajeev K

    2014-01-01

    Open source single nucleotide polymorphism (SNP) discovery pipelines for next generation sequencing data commonly requires working knowledge of command line interface, massive computational resources and expertise which is a daunting task for biologists. Further, the SNP information generated may not be readily used for downstream processes such as genotyping. Hence, a comprehensive pipeline has been developed by integrating several open source next generation sequencing (NGS) tools along with a graphical user interface called Integrated SNP Mining and Utilization (ISMU) for SNP discovery and their utilization by developing genotyping assays. The pipeline features functionalities such as pre-processing of raw data, integration of open source alignment tools (Bowtie2, BWA, Maq, NovoAlign and SOAP2), SNP prediction (SAMtools/SOAPsnp/CNS2snp and CbCC) methods and interfaces for developing genotyping assays. The pipeline outputs a list of high quality SNPs between all pairwise combinations of genotypes analyzed, in addition to the reference genome/sequence. Visualization tools (Tablet and Flapjack) integrated into the pipeline enable inspection of the alignment and errors, if any. The pipeline also provides a confidence score or polymorphism information content value with flanking sequences for identified SNPs in standard format required for developing marker genotyping (KASP and Golden Gate) assays. The pipeline enables users to process a range of NGS datasets such as whole genome re-sequencing, restriction site associated DNA sequencing and transcriptome sequencing data at a fast speed. The pipeline is very useful for plant genetics and breeding community with no computational expertise in order to discover SNPs and utilize in genomics, genetics and breeding studies. The pipeline has been parallelized to process huge datasets of next generation sequencing. It has been developed in Java language and is available at http://hpc.icrisat.cgiar.org/ISMU as a standalone

  11. The working zone in the interpolar area of the Faraday balance: an approach to testing the magnetic force factor stability criterion

    Directory of Open Access Journals (Sweden)

    Sandulyak Alexander V.

    2017-01-01

    Full Text Available Due to rapid development of the scientific and applied research in magnetic control and magnetophoresis of ferro- and ferromagnetic disperse fraction of various technological, natural and industry-specific media, the Faraday method is again in high demand as it is mainly aimed at defining magnetic susceptibility of solid and heterogeneous samples of small volumes. Based on the appearing (and then measured ponderomotive force impacting the sample, the method allows accurate determining of single particles magnetic susceptibility by using the data of the sample represented by a conglomerate of the particles of such a fraction. In addition, it is mentioned that to date there is still a great gap in the methodology of the Faraday method as there are no exact recommendations on choosing both the form of the polar pieces of the Faraday balance and the positioning of the sample (the location of the working zone in the interpolar area. Owing to these drawbacks, the well-known and long-time used Faraday method cannot be considered substantiated to a satisfactory degree. Thus, in our point of view, the treatment of the results obtained earlier with the help of the method should be cautious. In our work, we experimentally defined and substantiated an approach to identifying a working (local zone, viz. the zone with stable values of the magnetic force factor – the product of the field intensity and induction by its gradient. The approach features the relative phenomenological analysis and is exemplified by polar pieces of non-traditional spherical form. It has been demonstrated that in order to state the fact of mere existence of this zone (and its location in the interpolar area, the coordinate (usually nonlinear one characteristic of intensity or induction, which is obligatorily obtained in an experiment, should have an inflexion, which guarantees a functionally extreme view of the following coordinate characteristics both of the gradient and that of

  12. The Very Large Array Data Processing Pipeline

    Science.gov (United States)

    Kent, Brian R.; Masters, Joseph S.; Chandler, Claire J.; Davis, Lindsey E.; Kern, Jeffrey S.; Ott, Juergen; Schinzel, Frank K.; Medlin, Drew; Muders, Dirk; Williams, Stewart; Geers, Vincent C.; Momjian, Emmanuel; Butler, Bryan J.; Nakazato, Takeshi; Sugimoto, Kanako

    2018-01-01

    We present the VLA Pipeline, software that is part of the larger pipeline processing framework used for the Karl G. Jansky Very Large Array (VLA), and Atacama Large Millimeter/sub-millimeter Array (ALMA) for both interferometric and single dish observations.Through a collection of base code jointly used by the VLA and ALMA, the pipeline builds a hierarchy of classes to execute individual atomic pipeline tasks within the Common Astronomy Software Applications (CASA) package. Each pipeline task contains heuristics designed by the team to actively decide the best processing path and execution parameters for calibration and imaging. The pipeline code is developed and written in Python and uses a "context" structure for tracking the heuristic decisions and processing results. The pipeline "weblog" acts as the user interface in verifying the quality assurance of each calibration and imaging stage. The majority of VLA scheduling blocks above 1 GHz are now processed with the standard continuum recipe of the pipeline and offer a calibrated measurement set as a basic data product to observatory users. In addition, the pipeline is used for processing data from the VLA Sky Survey (VLASS), a seven year community-driven endeavor started in September 2017 to survey the entire sky down to a declination of -40 degrees at S-band (2-4 GHz). This 5500 hour next-generation large radio survey will explore the time and spectral domains, relying on pipeline processing to generate calibrated measurement sets, polarimetry, and imaging data products that are available to the astronomical community with no proprietary period. Here we present an overview of the pipeline design philosophy, heuristics, and calibration and imaging results produced by the pipeline. Future development will include the testing of spectral line recipes, low signal-to-noise heuristics, and serving as a testing platform for science ready data products.The pipeline is developed as part of the CASA software package by an

  13. Calibration pipeline for VIR data

    Science.gov (United States)

    Carraro, F.; Fonte, S.; Coradini, A.; Filacchione, G.; de Sanctis, M. C.; Ammannito, E.; Capria, M. T.; Cartacci, M.; Noschese, R.; Tosi, F.; Capaccioni, F.

    2011-10-01

    During the second quarter of 2011 VIR-MS (VIS and IR Mapping Spectrometer) [1] aboard Dawn mission [2] has approached Vesta in order to start a long period of acquisitions that will end at the beginning of 2012. Data acquired by each instrument always require a calibration process in order to remove all the instrument effects that could affect the scientific evaluations and analysis. VIR-MS instrument team has realized a calibration pipeline which has the goal of producing calibrated (1b level) data starting from the raw (1a level) ones. The other goal of the tool has been the check of the goodness of acquired data by means of the evaluation of a series of minimum requisites of each data file, such as the percentage of the saturated pixels, the presence of spikes or the mean S/N ratio of each qube.

  14. Northeast market view : Millennium Pipeline

    International Nuclear Information System (INIS)

    Pentzien, D.C.

    1998-01-01

    The potential for growth in the U.S. northeast natural gas markets was discussed. In presenting a forecast for natural gas consumption, the growth in demand was attributed primarily to the planned conversion of coal and oil-fired electric generation plants to gas-fired ones, combined with nuclear plant shutdowns, and more stringent environmental policies. An overview of the development of the Millennium Pipeline bringing natural gas from the Alberta border all the way to New York City was also provided, with an update on the current status of the project. Assuming no unreasonable delays in the present schedule, the line should be in service sometime in the year 2000. figs

  15. Labor Force Participation Rate

    Data.gov (United States)

    City and County of Durham, North Carolina — This thematic map presents the labor force participation rate of working-age people in the United States in 2010. The 2010 Labor Force Participation Rate shows the...

  16. U.S. interstate pipelines ran more efficiently in 1994

    International Nuclear Information System (INIS)

    True, W.R.

    1995-01-01

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies

  17. Current pipelines for neglected diseases.

    Science.gov (United States)

    di Procolo, Paolo; Jommi, Claudio

    2014-09-01

    This paper scrutinises pipelines for Neglected Diseases (NDs), through freely accessible and at-least-weekly updated trials databases. It updates to 2012 data provided by recent publications, and integrates these analyses with information on location of trials coordinators and patients recruitment status. Additionally, it provides (i) disease-specific information to better understand the rational of investments in NDs, (ii) yearly data, to understand the investment trends. The search identified 650 clinical studies. Leishmaniasis, Arbovirus infection, and Dengue are the top three diseases by number of clinical studies. Disease diffusion risk seems to be the most important driver of the clinical trials target choice, whereas the role played by disease prevalence and unmet need is controversial. Number of trials is stable between 2005 and 2010, with an increase in the last two years. Patient recruitment was completed for most studies (57.6%), and Phases II and III account for 35% and 28% of trials, respectively. The primary purpose of clinical investigations is prevention (49.3%), especially for infectious diseases with mosquitoes and sand flies as the vector, and treatment (43.2%), which is the primary target for parasitic diseases Research centres and public organisations are the most important clinical studies sponsors (58.9%), followed by the pharmaceutical industry (24.1%), foundations and non-governmental organisations (9.3%). Many coordinator centres are located in less affluent countries (43.7%), whereas OECD countries and BRICS account for 34.7% and 17.5% of trials, respectively. Information was partially missing for some parameters. Notwithstanding, and despite its descriptive nature, this research has enhanced the evidence of the literature on pipelines for NDs. Future contributions may further investigate whether trials metrics are consistent with the characteristics of the interested countries and the explicative variables of trials location, target

  18. Measurement of flow characteristics of solid particles mixed with gas in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Siberev, S P; Nazarov, S I; Soldatkin, G I

    1983-01-01

    A mathematical model of the interaction of solid particles in a gas stream flowing through a pipeline comprises equations for the energy and material balances in the system and for force and energy interactions between the solid particles and transducers located within the pipeline. Soviet researchers confirmed that the average value of stress recorded by a transducer is proportional to the average kinetic energy of the particles; for a constant particle speed, the stress is proportional to the mass flow of the particles. The analysis and flow transducer measurements are valuable in measuring and controlling flowline sand and soil in natural gas transport from gas wells and undergound storage facilities.

  19. Cool-down flow-rate limits imposed by thermal stresses in LNG pipelines

    Science.gov (United States)

    Novak, J. K.; Edeskuty, F. J.; Bartlit, J. R.

    Warm cryogenic pipelines are usually cooled to operating temperature by a small, steady flow of the liquid cryogen. If this flow rate is too high or too low, undesirable stresses will be produced. Low flow-rate limits based on avoidance of stratified two-phase flow were calculated for pipelines cooled with liquid hydrogen or nitrogen. High flow-rate limits for stainless steel and aluminum pipelines cooled by liquid hydrogen or nitrogen were determined by calculating thermal stress in thick components vs flow rate and then selecting some reasonable stress limits. The present work extends these calculations to pipelines made of AISI 304 stainless steel, 6061 aluminum, or ASTM A420 9% nickel steel cooled by liquid methane or a typical natural gas. Results indicate that aluminum and 9% nickel steel components can tolerate very high cool-down flow rates, based on not exceeding the material yield strength.

  20. A proposal of multi-objective function for submarine rigid pipelines route optimization via evolutionary algorithms

    Energy Technology Data Exchange (ETDEWEB)

    Fernandes, D.H.; Medeiros, A.R. [Subsea7, Niteroi, RJ (Brazil); Jacob, B.P.; Lima, B.S.L.P.; Albrecht, C.H. [Universidade Federaldo Rio de Janeiro (COPPE/UFRJ), RJ (Brazil). Coordenacao de Programas de Pos-graduacao em Engenharia

    2009-07-01

    This work presents studies regarding the determination of optimal pipeline routes for offshore applications. The assembly of an objective function is presented; this function can be later associated with Evolutionary Algorithm to implement a computational tool for the automatic determination of the most advantageous pipeline route for a given scenario. This tool may reduce computational overheads, avoid mistakes with route interpretation, and minimize costs with respect to submarine pipeline design and installation. The following aspects can be considered in the assembly of the objective function: Geophysical and geotechnical data obtained from the bathymetry and sonography; the influence of the installation method, total pipeline length and number of free spans to be mitigated along the routes as well as vessel time for both cases. Case studies are presented to illustrate the use of the proposed objective function, including a sensitivity analysis intended to identify the relative influence of selected parameters in the evaluation of different routes. (author)

  1. Integer programming formulation and variable neighborhood search metaheuristic for the multiproduct pipeline scheduling problem

    Energy Technology Data Exchange (ETDEWEB)

    Souza Filho, Erito M.; Bahiense, Laura; Ferreira Filho, Virgilio J.M. [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Lima, Leonardo [Centro Federal de Educacao Tecnologica Celso Sukow da Fonseca (CEFET-RJ), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Pipeline are known as the most reliable and economical mode of transportation for petroleum and its derivatives, especially when large amounts of products have to be pumped for large distances. In this work we address the short-term schedule of a pipeline system comprising the distribution of several petroleum derivatives from a single oil refinery to several depots, connected to local consumer markets, through a single multi-product pipeline. We propose an integer linear programming formulation and a variable neighborhood search meta-heuristic in order to compare the performances of the exact and heuristic approaches to the problem. Computational tests in C language and MOSEL/XPRESS-MP language are performed over a real Brazilian pipeline system. (author)

  2. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  3. Optimal design of regional wastewater pipelines and treatment plant systems.

    Science.gov (United States)

    Brand, Noam; Ostfeld, Avi

    2011-01-01

    This manuscript describes the application of a genetic algorithm model for the optimal design of regional wastewater systems comprised of transmission gravitational and pumping sewer pipelines, decentralized treatment plants, and end users of reclaimed wastewater. The algorithm seeks the diameter size of the designed pipelines and their flow distribution simultaneously, the number of treatment plants and their size and location, the pump power, and the required excavation work. The model capabilities are demonstrated through a simplified example application using base runs and sensitivity analyses. Scaling of the proposed methodology to real life wastewater collection and treatment plants design problems needs further testing and developments. The model is coded in MATLAB using the GATOOL toolbox and is available from the authors.

  4. Structural health monitoring of pipelines rehabilitated with lining technology

    Science.gov (United States)

    Farhidzadeh, Alireza; Dehghan-Niri, Ehsan; Salamone, Salvatore

    2014-03-01

    Damage detection of pipeline systems is a tedious and time consuming job due to digging requirement, accessibility, interference with other facilities, and being extremely wide spread in metropolitans. Therefore, a real-time and automated monitoring system can pervasively reduce labor work, time, and expenditures. This paper presents the results of an experimental study aimed at monitoring the performance of full scale pipe lining systems, subjected to static and dynamic (seismic) loading, using Acoustic Emission (AE) technique and Guided Ultrasonic Waves (GUWs). Particularly, two damage mechanisms are investigated: 1) delamination between pipeline and liner as the early indicator of damage, and 2) onset of nonlinearity and incipient failure of the liner as critical damage state.

  5. Signature of the CERN GoldenBook at CERN by Peters Higgs British theoretical physicist - He worked on proposals to unify the weak and the electromagnetic forces into a single electroweak theory, The Boson of Higgs.

    CERN Multimedia

    Claudia Marcelloni

    2008-01-01

    Signature of the CERN GoldenBook at CERN by Peters Higgs British theoretical physicist - He worked on proposals to unify the weak and the electromagnetic forces into a single electroweak theory, The Boson of Higgs.

  6. Visit of Peters Higgs at Point 2 ALICE Experiment - British theoretical physicist, He worked on proposals to unify the weak and the electromagnetic forces into a single electroweak theory, The Boson of Higgs.

    CERN Multimedia

    Mona Schweizer

    2008-01-01

    Visit of Peters Higgs at Point 2 ALICE Experiment - British theoretical physicist, He worked on proposals to unify the weak and the electromagnetic forces into a single electroweak theory, The Boson of Higgs.

  7. Flooding simulation of hilly pipeline commisionning process

    Energy Technology Data Exchange (ETDEWEB)

    Nan, Zhang [China National Oil and Gas Exploration and Development Corporation and China University of Petroleum, Beijing (China); Jing, Gong [China University of Petroleum, Beijing (China); Baoli, Zhu [China National Oil and Gas Exploration and Development Corporation, Beijing (China); Lin, Zheng [CNPC Oil and Gas Control Center, Beijing (China)

    2010-07-01

    When the construction of a pipeline has been completed, the pipeline flooding is done as part of the pipeline commissioning process. This method consists of filling the empty pipe with water or oil. In a pipeline situated in hilly terrain, air entrapped in the fluid causes problems with the flooding process and it is necessary to discharge the accumulated air to address this issue. The aim of this paper is to provide a model for predicting the location and volume of air pockets in a pipeline. This model was developed based on the fundamentals of mass balance and momentum transfer in multiphase flow and was then applied to a pipeline in China and compared with the SCADA data. Results showed a good match between the model's predictions of hydraulic movement and the real data from SCADA. The two flow model developed can predict hydraulic movement during pipeline flooding in a hilly area and thus it can be used to predict water front location and air pocket movement in the pipe.

  8. Pipeline's natural frequency response due to internal pressure effect

    Energy Technology Data Exchange (ETDEWEB)

    Massa, Andre L.L.; Guevara Junior, Nestor O. [Suporte - Consultoria e Projetos Ltda., Rio de Janeiro, RJ (Brazil); Galgoul, Nelson S. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil); Universidade Federal do Rio de Janeiro (UFRJ), Rio de Janeiro, RJ (Brazil); Fernandes, Antonio C.; Coelho, Fabio M. [Universidade Federal do Rio de Janeiro (UFRJ), Rio de Janeiro, RJ (Brazil). Coordenacao de Programas de Pos-graduacao de Engenharia

    2009-12-19

    A few years ago, a discussion about how internal pressure is treated in submarine pipelines has taken place. Galgoul et al (2004) have pointed out the conservatism of the latest recommendations for pipeline free-span evaluations associated to the way the axial force is considered in the determination of the pipeline natural frequency. Fyrileiv and Collberg (2005) have also discussed this point in defense of the effective axial force concept and its use in the natural frequency determination. In order to contribute to this aspect, an experimental test has been performed with a fully embedded pipeline which was pressurized. The main object consists in showing that the pipe is under tension (and not under compression) and, as a consequence, it is the authors' intention to prove that the natural frequency increases instead of reducing when the internal pressure is incremented. In addition to the test, a finite element model has been presented where this internal pressure effect is taken into account as it actually is (and not as an axial force) in order to show the real behavior of the wall stresses. Static analyses, as well as modal and transient analysis have been performed in order to compare theoretical results with the experimental test conducted. (author)

  9. Optimal hub location in pipeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Dott, D.R.; Wirasinghe, S.C.; Chakma, A. [Univ. of Calgary, Alberta (Canada)

    1996-12-31

    This paper discusses optimization strategies and techniques for the location of natural gas marketing hubs in the North American gas pipeline network. A hub is a facility at which inbound and outbound network links meet and freight is redirected towards their destinations. Common examples of hubs used in the gas pipeline industry include gas plants, interconnects and market centers. Characteristics of the gas pipeline industry which are relevant to the optimization of transportation costs using hubs are presented. Allocation techniques for solving location-allocation problems are discussed. An outline of the research in process by the authors in the field of optimal gas hub location concludes the paper.

  10. Prospects for coal slurry pipelines in California

    Science.gov (United States)

    Lynch, J. F.

    1978-01-01

    The coal slurry pipeline segment of the transport industry is emerging in the United States. If accepted it will play a vital role in meeting America's urgent energy requirements without public subsidy, tax relief, or federal grants. It is proven technology, ideally suited for transport of an abundant energy resource over thousands of miles to energy short industrial centers and at more than competitive costs. Briefly discussed are the following: (1) history of pipelines; (2) California market potential; (3) slurry technology; (4) environmental benefits; (5) market competition; and (6) a proposed pipeline.

  11. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  12. ARTIP: Automated Radio Telescope Image Processing Pipeline

    Science.gov (United States)

    Sharma, Ravi; Gyanchandani, Dolly; Kulkarni, Sarang; Gupta, Neeraj; Pathak, Vineet; Pande, Arti; Joshi, Unmesh

    2018-02-01

    The Automated Radio Telescope Image Processing Pipeline (ARTIP) automates the entire process of flagging, calibrating, and imaging for radio-interferometric data. ARTIP starts with raw data, i.e. a measurement set and goes through multiple stages, such as flux calibration, bandpass calibration, phase calibration, and imaging to generate continuum and spectral line images. Each stage can also be run independently. The pipeline provides continuous feedback to the user through various messages, charts and logs. It is written using standard python libraries and the CASA package. The pipeline can deal with datasets with multiple spectral windows and also multiple target sources which may have arbitrary combinations of flux/bandpass/phase calibrators.

  13. Basic Block of Pipelined ADC Design Requirements

    Directory of Open Access Journals (Sweden)

    V. Kledrowetz

    2011-04-01

    Full Text Available The paper describes design requirements of a basic stage (called MDAC - Multiplying Digital-to- Analog Converter of a pipelined ADC. There exist error sources such as finite DC gain of opamp, capacitor mismatch, thermal noise, etc., arising when the switched capacitor (SC technique and CMOS technology are used. These non-idealities are explained and their influences on overall parameters of a pipelined ADC are studied. The pipelined ADC including non-idealities was modeled in MATLAB - Simulink simulation environment.

  14. Engineered pipeline field joint coating solutions for demanding conditions

    Energy Technology Data Exchange (ETDEWEB)

    Lwemuchi, Andre L.; Gudme, Carl C.; Buchanan, Robert [Canusa-CPS, Toronto, OT (Canada)

    2009-12-19

    Trends in the oil and gas pipeline industry see that the demand for new technologies and engineered solutions for pipeline external coatings are increasing. In general, superior mechanical resistance and long term performance are being required in addition to operating at higher temperatures. This demand for more robust coatings has been created because of factors such as more remote fields, deep onshore reservoirs, deep water offshore fields and heavy oil that must be pumped at higher temperatures. The development of new techniques for pipeline construction is also exposing the coatings to more aggressive construction conditions. Because of this, the use of three layer and multi-layer polypropylene mainline coating systems have been growing considerably. Following this trend, the field joint coating manufacturers developed polypropylene systems and more recently had to work on engineered solutions required for recent offshore projects in Europe where very thick polypropylene field joint heat-shrinkable systems were provided. In addition, projects in remote locations such as the recently completed projects in the Brazilian Amazon required special logistics and field services. The growth of the mining industry in South America with slurry pipelines constructed in the recent years also demanded thicker, more robust coatings. The popularization of directional drilling and shore approach applications moved the industry to develop improved abrasion resistant coating systems such as using sacrificial elements to protect the primary coating integrity after the pipeline pull. PETROBRAS plans to replace existing thermally insulated pipelines crossing Great Sao Paulo. Therefore, pumping heavy oil at high temperatures created the need to develop improved mainline and field joint coatings to avoid having the same sort of problems they are facing in existing thermally insulated lines. Due to these needs, the field joint coating manufactures have been challenged to provide

  15. Knowledge Pipeline: A Task Oriented Way to Implement Knowledge Management

    International Nuclear Information System (INIS)

    Pan Jiajie

    2014-01-01

    Concept of knowledge pipeline: There are many pipelines named by tasks or business processes in an organization. Knowledge contributors put knowledge to its corresponding pipelines. A maintenance team could keep the knowledge in pipelines clear and valid. Users could get knowledge just like opening a faucet in terms of their tasks or business processes

  16. 49 CFR 192.627 - Tapping pipelines under pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.627 Tapping pipelines under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to make...

  17. 76 FR 21423 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-04-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0063] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... application is for two 30-inch segments, segments 3 and 4, of the TPL 330 natural gas pipeline located in St...

  18. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  19. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  20. 77 FR 26822 - Pipeline Safety: Verification of Records

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0068] Pipeline Safety: Verification of Records AGENCY: Pipeline and Hazardous Materials... issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify...