  1. Test Plan: WIPP bin-scale CH TRU waste tests

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs

  2. Quarter-scale modeling of room convergence effects on CH [contact-handled] TRU drum waste emplacements using WIPP [Waste Isolation Pilot Plant] reference design geometries

    International Nuclear Information System (INIS)

    VandeKraats, J.

    1987-11-01

    This study investigates the effect of horizontal room convergence on CH waste packages emplaced in the WIPP Reference Design geometry (rooms 13 feet high by 33 feet wide, with minus 3/8 inch screened backfill emplaced over and around the waste packages) as a function of time. Based on two tests, predictions were made with regard to full-scale 6-packs emplaced in the Reference Design geometry. These are that load will be transmitted completely through the stack within the first five years after waste emplacement and all drums in all 6-packs will be affected; that virtually all drums will show some deformation eight years after emplacement; that some drums may breach before the eighth year after emplacement has elapsed; and that based on criteria developed during testing, it is predicted that 1% of the drums emplaced will be breached after 8 years and, after 15 years, approximately 12% of the drums are predicted to be breached. 8 refs., 41 figs., 3 tabs

  3. DSA in digital replantations

    International Nuclear Information System (INIS)

    Wang Liuhong; Chao Ming; Jiang Dingyao; Zhang Guangqiang; Wu Jianjun; Chen Xianyi; Li Bin; Sun Jihong

    2008-01-01

    Objective: To assess revascularization and vessel anastomosis in digital replantations with DSA. Methods: Twelve cases of digital replantations underwent digital subtract angiography during 2 to 4 days after fingers reattachment. The vessel anastomosis, hemodynamics, stenosis and discontinuation were investigated. The unobstructed and smooth anastomosis was suggested as early stage survival of the reattached fingers, the spasm and stenosis of the reattached vessels were considered as mild vascular crisis, and the discontinuation of hemodynamics were indicated as severe vascular crisis. Results: The total 27 vessels were clearly displayed on DSA. Of these vessels, 23 vessels were unobstructed and smooth, all digits were survived. Diagnosis coincidence of early stage survival was 100% (23/23). Two vessels were obstructed, which were testified having thrombus by operation research. The other 2 vessels were spasm, the digits were also survived ultimately by expectant treatment. All 4 abnormal vessel anatomosis were found by DSA. Conclusion: DSA is important modality in assessing revascularization and blood circulation for digital replantations, guiding in dealing with the vascular crisis, and in predicting early stage survival of the reattached digits. (authors)

  4. WIPP Pecos Management Reports

    Science.gov (United States)

    These reviews and evaluations compiled by Pecos Management Services, Inc. encompass the current and future WIPP activities in the program areas of TRU waste characterization, transportation, and disposal.

  5. WIPP Gas-Generation Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Frank S. Felicione; Steven M. Frank; Dennis D. Keiser

    2007-05-01

    An experimental investigation was conducted for gas generation in contact-handled transuranic (CH TRU) wastes subjected for several years to conditions similar to those expected to occur at the Waste Isolation Pilot Plant (WIPP) should the repository eventually become inundated with brine. Various types of actual CH TRU wastes were placed into 12 corrosion-resistant vessels. The vessels were loosely filled with the wastes, which were submerged in synthetic brine having the same chemical composition as that in the WIPP vicinity. The vessels were also inoculated with microbes found in the Salado Formation at WIPP. The vessels were sealed, purged, and the approximately 750 ml headspace in each vessel was pressurized with nitrogen gas to approximately 146 atmospheres to create anoxic conditions at the lithostatic pressure estimated in the repository were it to be inundated. The temperature was maintained at the expected 30°C. The test program objective was to measure the quantities and species of gases generated by metal corrosion, radiolysis, and microbial activity. These data will assist in the specification of the rates at which gases are produced under inundated repository conditions for use in the WIPP Performance Assessment computer models. These experiments were very carefully designed, constructed, instrumented, and performed. Approximately 6 1/2 years of continuous, undisturbed testing were accumulated. Several of the vessels showed significantly elevated levels of generated gases, virtually all of which was hydrogen. Up to 4.2% hydrogen, by volume, was measured. Only small quantities of other gases, principally carbon dioxide, were detected. Gas generation was found to depend strongly on the waste composition. The maximum hydrogen generation occurred in vessels containing carbon steel. Visual examination of carbon-steel coupons confirmed the correspondence between the extent of observable corrosion and hydrogen generation. Average corrosion penetration rates

  6. Clinical usefulness of stereoscopic DSA

    International Nuclear Information System (INIS)

    Bussaka, Hiromasa; Takahashi, Mutsumasa; Miyawaki, Masayuki; Korogi, Yukinori; Yamashita, Yasuyuki; Izunaga, Hiroshi; Nakashima, Koki; Yoshizumi, Kazuhiro

    1988-01-01

    Digital subtraction angiography (DSA) is widely used as a screening examination for vascular diseases, but it has several disadvantages, one of which is overlapping of the vessels. To overcome this disadvantage, stereoscopic technique is applied to our DSA equipment. Stereoscopic DSA is obtained by alternate exposures from twin focal spots of an x-ray tube without additional contrast medium or radiation exposures. Stereoscopic intravenous DSA was performed 223 times, and was useful in 157 times (70.4 %) for the identification and stereoscopic observation of the abdominal and pelvic vessels. Thirty-seven intra-arterial DSAs were performed stereoscopically for cranial, abdominal and pelvic angiograms, and effective studies were obtained in 30 DSAs (81.1 %) with demonstration of tumor stains and displacement of the vessels. It is necessary to use adequate compensation filters for the good stereoscopic DSAs, especially for the cervical and thoracic DSAs. (author)

  7. WIPP Repository Reconfiguration

    Science.gov (United States)

    On August 30, 2011, the U.S. Department of Energy (DOE) provided a proposed planned change request that will relocate Panels 9 and 10 from the main north-south access drifts to south of the existing Panels 4 and 5 in the WIPP repository.

  8. Sandia WIPP calibration traceability

    Energy Technology Data Exchange (ETDEWEB)

    Schuhen, M.D. [Sandia National Labs., Albuquerque, NM (United States); Dean, T.A. [RE/SPEC, Inc., Albuquerque, NM (United States)

    1996-05-01

    This report summarizes the work performed to establish calibration traceability for the instrumentation used by Sandia National Laboratories at the Waste Isolation Pilot Plant (WIPP) during testing from 1980-1985. Identifying the calibration traceability is an important part of establishing a pedigree for the data and is part of the qualification of existing data. In general, the requirement states that the calibration of Measuring and Test equipment must have a valid relationship to nationally recognized standards or the basis for the calibration must be documented. Sandia recognized that just establishing calibration traceability would not necessarily mean that all QA requirements were met during the certification of test instrumentation. To address this concern, the assessment was expanded to include various activities.

  9. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  10. Proactive DSA application and implementation

    Energy Technology Data Exchange (ETDEWEB)

    Draelos, T.; Hamilton, V.; Istrail, G.

    1998-05-03

    Data authentication as provided by digital signatures is a well known technique for verifying data sent via untrusted network links. Recent work has extended digital signatures to allow jointly generated signatures using threshold techniques. In addition, new proactive mechanisms have been developed to protect the joint private key over long periods of time and to allow each of the parties involved to verify the actions of the other parties. In this paper, the authors describe an application in which proactive digital signature techniques are a particularly valuable tool. They describe the proactive DSA protocol and discuss the underlying software tools that they found valuable in developing an implementation. Finally, the authors briefly describe the protocol and note difficulties they experienced and continue to experience in implementing this complex cryptographic protocol.

  11. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  12. Optimization of waste operations at WIPP

    International Nuclear Information System (INIS)

    Halverson, T.W.; Cole, L.T.

    1986-01-01

    The Waste Isolation Plant (WIPP) will receive nuclear waste in late 1988. The unique material-handling of contact- and remote-handled transuranic waste containers has resulted in handling systems with unique features and complications. Optimum waste handling at WIPP requires cooperation and design considerations at the waste generator site, the transportation system, and at WIPP. This cooperation reduces costs for all three parties. Best WIPP handling considerations require (1) maximizing transuranic package transporter (TRUPACT) payload, (2) minimizing operational steps, (3) minimizing lifting operations (slide loads instead of lifting), and (4) automating processes where practical. Conclusions and recommendations reached for WIPP operations are presented

  13. Incorporating DSA in multipatterning semiconductor manufacturing technologies

    Science.gov (United States)

    Badr, Yasmine; Torres, J. A.; Ma, Yuansheng; Mitra, Joydeep; Gupta, Puneet

    2015-03-01

    Multi-patterning (MP) is the process of record for many sub-10nm process technologies. The drive to higher densities has required the use of double and triple patterning for several layers; but this increases the cost of the new processes especially for low volume products in which the mask set is a large percentage of the total cost. For that reason there has been a strong incentive to develop technologies like Directed Self Assembly (DSA), EUV or E-beam direct write to reduce the total number of masks needed in a new technology node. Because of the nature of the technology, DSA cylinder graphoepitaxy only allows single-size holes in a single patterning approach. However, by integrating DSA and MP into a hybrid DSA-MP process, it is possible to come up with decomposition approaches that increase the design flexibility, allowing different size holes or bar structures by independently changing the process for every patterning step. A simple approach to integrate multi-patterning with DSA is to perform DSA grouping and MP decomposition in sequence whether it is: grouping-then-decomposition or decomposition-then-grouping; and each of the two sequences has its pros and cons. However, this paper describes why these intuitive approaches do not produce results of acceptable quality from the point of view of design compliance and we highlight the need for custom DSA-aware MP algorithms.

  14. WIPP 2004 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2005-09-30

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  15. Simulations of spatial DSA morphology, DSA-aware assist features and block copolymer-homopolymer blends

    Science.gov (United States)

    Latypov, Azat; Coskun, Tamer H.; Garner, Grant; Preil, Moshe; Schmid, Gerard; Xu, Ji; Zou, Yi

    2014-03-01

    Further enhancements to Monte Carlo and Self-Consistent Field Theory Directed Self-Assembly (DSA) simulation capabilities implemented in GLOBALFOUNDRIES are presented and discussed, along with the results of their applications. We present the simulation studies of DSA in graphoepitaxy confinement wells, where the DSA process parameters are varied in order to determine the optimal set of parameters resulting in a robust and etch transferrable phase morphology. A novel concept of DSA-aware assist features for the optical lithography process is presented and demonstrated in simulations. The results of the DSA simulations and studies for the DSA process using a blend of homopolymers and diblock copolymers are also presented and compared with the simulated diblock copolymer systems.

  16. Assessment of allowable transuranic activity levels for WIPP wastes

    International Nuclear Information System (INIS)

    1987-12-01

    This study provides a technical evaluation for the establishment of an upper limit on the transuranic content of waste packages to be received. To accomplish this, the predicted radiological performance of WIPP is compared to the radiological performance requirements applicable to WIPP. These performance requirements include radiation protection standards for both routine facility operations and credible operational accidents. These requirements are discussed in Chapter 2.0. From the margin between predicted performance and the performance requirements, the maximum allowable transuranic content of waste packages can then be inferred. Within the resulting compliance envelope, a waste acceptance criterion can be established that delineates the allowable level of transuranic radioactivity content for contact handled (CH) and remote handled (RH) waste packages. 13 refs., 8 tabs

  17. WIPP: why are we waiting?

    International Nuclear Information System (INIS)

    Barker, K.

    1991-01-01

    Rooms cut into salt almost half a mile below the state of New Mexico could become the United States' first underground repository for defence generated transuranic waste. The Department of Energy (DoE) was hoping to ship the first waste to the Waste Isolation Pilot Plant (WIPP) this August, but the $800 million project has faced bureaucratic delays and a definite date has yet to be set. The state of New Mexico established the Environmental Evaluation Group (EEG) to perform an independent technical evaluation of the project with respect to potential radiation exposure for people or environmental degradation in the area around the WIPP site. The Waste Isolation Pilot Plant has two objectives: to perform scientific investigations into the behaviour of salt rock and its interactions with transuranic and mixed waste under a variety of conditions; and to demonstrate that transuranic waste can be safely handled, transported and stored in a geologic repository. The EEG is unhappy about proposed in-repository tests to assess the long term performance of WIPP. (author)

  18. Value of 3D DSA in diagnosis of intracranial aneurysms compared with that of 2D DSA

    International Nuclear Information System (INIS)

    Zhang Xiaolong; Ling Feng; Shen Tianzhen; Huang Xianglong; Wang Daming; Zhang Hongqi; Miao Zhongrong; Song Qingbin

    2001-01-01

    Objective: To compare the value of 3D DSA with 2D DSA in the diagnosis of intracranial aneurysms. Methods: 22 patients suspected to be with intracranial aneurysms were undergone both 3D DSA and 2D DSA. The number of aneurysms, the relationship between aneurysm and parent artery, aneurysm and local vessels branches from the sac were detected with both 3D DSA and 2D DSA with double blind methods. Results: No false positiveness and false negativeness of 3D DSA were found in diagnosis of 30 intracranial aneurysms while 2 false positiveness and 2 false negativeness of 2D DSA were found. 3D DSA could clarify the relationships of all aneurysms with their parent arteries and with the local vessels, and some branches from 2 sacs were identified with 3D DSA. 2D DSA could clarify the relationships of only 8 aneurysms (including 4 PcoAN, 3 AcoAN and 1 CaroOphAN) with their parent arteries and with the local vessels, and 2D DSA could not identify the branches from the sac. Conclusions: 3D DSA was superior to 2D DSA in the diagnosis of intracranial aneurysms

  19. Successes and Experiences of the WIPP Project

    International Nuclear Information System (INIS)

    Chu, Margaret S.Y.; Weart, Wendell D.

    2000-01-01

    In May 1998, the US Environmental Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with all of the applicable regulations governing the permanent disposal of spent nuclear fuel, high-level waste, and transuranic radioactive waste. The WIPP, a transuranic waste repository, is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal regulations and be certified to receive wastes. Many lessons were learned throughout the 25-year history of the WIPP--from site selection to the ultimate successful certification. The experiences and lessons learned from the WIPP may be of general interest to other repository programs in the world. The lessons learned include all facets of a repository program: programmatic, managerial, regulatory, technical, and social. This paper addresses critical issues that arose during the 25 years of WIPP history and how they influenced the program

  20. Shipment and Disposal of Solidified Organic Waste (Waste Type IV) to the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    D'Amico, E. L; Edmiston, D. R.; O'Leary, G. A.; Rivera, M. A.; Steward, D. M.

    2006-01-01

    In April of 2005, the last shipment of transuranic (TRU) waste from the Rocky Flats Environmental Technology Site to the WIPP was completed. With the completion of this shipment, all transuranic waste generated and stored at Rocky Flats was successfully removed from the site and shipped to and disposed of at the WIPP. Some of the last waste to be shipped and disposed of at the WIPP was waste consisting of solidified organic liquids that is identified as Waste Type IV in the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC) document. Waste Type IV waste typically has a composition, and associated characteristics, that make it significantly more difficult to ship and dispose of than other Waste Types, especially with respect to gas generation. This paper provides an overview of the experience gained at Rocky Flats for management, transportation and disposal of Type IV waste at WIPP, particularly with respect to gas generation testing. (authors)

  1. Influence of template fill in graphoepitaxy DSA

    Science.gov (United States)

    Doise, Jan; Bekaert, Joost; Chan, Boon Teik; Hong, SungEun; Lin, Guanyang; Gronheid, Roel

    2016-03-01

    Directed self-assembly (DSA) of block copolymers (BCP) is considered a promising patterning approach for the 7 nm node and beyond. Specifically, a grapho-epitaxy process using a cylindrical phase BCP may offer an efficient solution for patterning randomly distributed contact holes with sub-resolution pitches, such as found in via and cut mask levels. In any grapho-epitaxy process, the pattern density impacts the template fill (local BCP thickness inside the template) and may cause defects due to respectively over- or underfilling of the template. In order to tackle this issue thoroughly, the parameters that determine template fill and the influence of template fill on the resulting pattern should be investigated. In this work, using three process flow variations (with different template surface energy), template fill is experimentally characterized as a function of pattern density and film thickness. The impact of these parameters on template fill is highly dependent on the process flow, and thus pre-pattern surface energy. Template fill has a considerable effect on the pattern transfer of the DSA contact holes into the underlying layer. Higher fill levels give rise to smaller contact holes and worse critical dimension uniformity. These results are important towards DSA-aware design and show that fill is a crucial parameter in grapho-epitaxy DSA.

  2. WIPP performance assessment: impacts of human intrusion

    International Nuclear Information System (INIS)

    Anderson, D.R.; Hunter, R.L.; Bertram-Howery, S.G.; Lappin, A.R.

    1989-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is a research and development facility that may become the USA's first and only mined geologic repository for transuranic waste. Human intrusion into the WIPP repository after closure has been shown by preliminary sensitivity analyses and calculations of consequences to be an important, and perhaps the most important, factor in long-term repository performance

  3. The cosmic ray muon flux at WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Esch, E.-I. [Los Alamos National Laboratory, LANSCE-3, MS H855, Los Alamos, NM 87545 (United States) and II. Physikalisches Institut, Justus Liebig Univeritaet Giessen, Giessen (Germany)]. E-mail: ernst@lanl.gov; Bowles, T.J [Los Alamos National Laboratory, LANSCE-3, MS H855, Los Alamos, NM 87545 (United States); Hime, A. [Los Alamos National Laboratory, LANSCE-3, MS H855, Los Alamos, NM 87545 (United States); Pichlmaier, A. [Los Alamos National Laboratory, LANSCE-3, MS H855, Los Alamos, NM 87545 (United States); Reifarth, R. [Los Alamos National Laboratory, LANSCE-3, MS H855, Los Alamos, NM 87545 (United States); Wollnik, H. [II. Physikalisches Institut, Justus Liebig Univeritaet Giessen, Giessen (Germany)

    2005-02-11

    In this work, a measurement of the muon intensity at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, NM, USA is presented. WIPP is a salt mine with a depth of 655m. The vertical muon flux was measured with a two panel scintillator coincidence setup to {phi}{sub vert}=(3.10{sub -0.07}{sup +0.05})10{sup -7}s{sup -1}cm{sup -}2sr{sup -1}.

  4. WIPP startup: Overcoming unprecedented challenges

    International Nuclear Information System (INIS)

    Hunt, Arlen E.

    1992-01-01

    Since its authorization by the U.S. Congress in Public Law 96-164, the Waste Isolation Pilot Plant Program has achieved significant progress. Subsequent to a Record of Decision based on the October 1980 Final Environmental Impact Statement (FEIS), the scientific and engineering challenge of constructing a 100-acre mined repository to demonstrate the safe and environmentally sound disposal of defense program generated transuranic waste became reality. Since initial conception, however, a complex program has evolved. Demonstration of compliance with the requirements of the Resource Conservation and Recovery Act (RCRA) and Environmental Protection Agency (EPA) disposal Standards defined in 10 CFR 191, Subpart B (yet to be repromulgated), became prerequisites to a disposal decision. On June 13, 1990, based on a supplement to the 1980 FEIS, the decision was made to redefine the program to include a formal test phase. This decision required an addendum to the Final Safety Analysis Report to assure commitment to safety considerations, an intensive operational readiness review effort, and the need for a No-Migration Determination for the Environmental Protection Agency. In addition to meeting the technical challenges, the need to satisfy a broad spectrum of oversight groups (some directly funded by the Department of Energy) was required. With the decision making process publicly displayed on the Secretary of Energy's Decision Plan, the unprecedented challenges of the WIPP Program were painstakingly met, one by one, in an accountable and visible manner. (author)

  5. Pretest characterization of WIPP experimental waste

    International Nuclear Information System (INIS)

    Johnson, J.; Davis, H.

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, is an underground repository designed for the storage and disposal of transuranic (TRU) wastes from US Department of Energy (DOE) facilities across the country. The Performance Assessment (PA) studies for WIPP address compliance of the repository with applicable regulations, and include full-scale experiments to be performed at the WIPP site. These experiments are the bin-scale and alcove tests to be conducted by Sandia National Laboratories (SNL). Prior to conducting these experiments, the waste to be used in these tests needs to be characterized to provide data on the initial conditions for these experiments. This characterization is referred to as the Pretest Characterization of WIPP Experimental Waste, and is also expected to provide input to other programmatic efforts related to waste characterization. The purpose of this paper is to describe the pretest waste characterization activities currently in progress for the WIPP bin-scale waste, and to discuss the program plan and specific analytical protocols being developed for this characterization. The relationship between different programs and documents related to waste characterization efforts is also highlighted in this paper

  6. WIPP fire hazards and risk analysis

    International Nuclear Information System (INIS)

    1991-05-01

    The purpose of this analysis was to conduct a fire hazards risk analysis of the Transuranic (TRU) contact-handled waste receipt, emplacement, and disposal activities at the Waste Isolation Pilot Plant (WIPP). The technical bases and safety envelope for these operations are defined in the approved WIPP Final Safety Analysis Report (FSAR). Although the safety documentation for the initial phase of the Test Program, the dry bin scale tests, has not yet been approved by the Department of Energy (DOE), reviews of the draft to date, including those by the Advisory Committee on Nuclear Facility Safety (ACNFS), have concluded that the dry bin scale tests present no significant risks in excess of those estimated in the approved WIPP FSAR. It is the opinion of the authors and reviewers of this analysis, based on sound engineering judgment and knowledge of the WIPP operations, that a Fire Hazards and Risk Analysis specific to the dry bin scale test program is not warranted prior to first waste receipt. This conclusion is further supported by the risk analysis presented in this document which demonstrates the level of risk to WIPP operations posed by fire to be extremely low. 15 refs., 41 figs., 48 tabs

  7. Intra-arterial DSA in hypervascular bone neoplasms

    Energy Technology Data Exchange (ETDEWEB)

    Arlart, I.P.; Merk, J.; Baehren, W.

    1984-11-01

    In order to evaluate intra-arterial DSA in malignant bone tumors (osteosarcoma n=2, aggressive osteoblastoma n=1) three patients were examined angiographically including conventional arteriography and DSA. Compared with conventional angiograms DSA imaging demonstrated a reduced peripheral vascular information due to reduced spatial resolution. Advantages of DSA were an improved visualization of tumor blush and atypical venous return and in addition a reduction of volume rsp. concentration of the contrast material using a iodine concentration of 200 mg/ml for preoperative vascular mapping and of 300 mg/ml for diagnostic tumor imaging.

  8. Intra-arterial DSA in hypervascular bone neoplasms

    International Nuclear Information System (INIS)

    Arlart, I.P.; Merk, J.; Baehren, W.

    1984-01-01

    In order to evaluate intra-arterial DSA in malignant bone tumors (osteosarcoma n=2, aggressive osteoblastoma n=1) three patients were examined angiographically including conventional arteriography and DSA. Compared with conventional angiograms DSA imaging demonstrated a reduced peripheral vascular information due to reduced spatial resolution. Advantages of DSA were an improved visualization of tumor blush and atypical venous return and in addition a reduction of volume rsp. concentration of the contrast material using a iodine concentration of 200 mg/ml for preoperative vascular mapping and of 300 mg/ml for diagnostic tumor imaging. (orig.) [de

  9. The comparison of aneurysmal necks measured on three dimensional reconstruction images of rotational DSA and those of traditional DSA

    International Nuclear Information System (INIS)

    Wu Chunhong; Chen Zuoquan; Gu Binxian; Zhang Guiyun

    2006-01-01

    Objective: To evaluate the value of three dimensional reconstruction images of rotational DSA on measuring aneurysmal necks and make a comparison with traditional DSA so as to provide more abundant and accurate information for the embolization of aneurysm. Methods: A comparison was made between the measurement of aneurismal necks from 14 cases with traditional DSA examination and a measurement made on three dimensional reconstruction images of the same patients. Results: There was a difference shown in the measurement of the aneurysmal necks between three dimensional reconstruction images of rotational DSA and those of traditional DSA, outcoming with more angles and data on three dimensional reconstruction images. Conclusions: There are more angles of aneurysmal neck can be shown on rotational 3D DSA especially for the demonstration of the largest aneurysmal neck with a directional value for the intervention. (authors)

  10. Few Projections Astrotomography: 2-CLEAN Dsa Reconstruction

    Science.gov (United States)

    Agafonov, Michail

    The radioastronomical approach to the tomographical problem the main elements of which were published by us in 1989-1990 was developed and presented as 2-CLEAN DSA Method of Reconstruction [1 2]. Radio Images of the Crab Nebula from the Lunar occultations data were reconstructed at 750 and 178 MHz [3]. The basis makes the solution with the use of Synthesized Beam (SB). To remove the distortion occurring because of the SB sidelobes influence the CLEAN algorithm realizations are used. The research of solution convergence the use of ST-CLEAN and TC-CLEAN algorithms to determine the permissible solution area are being summarized. The Method allows to carry out 2D recognition in a wide space frequency band {0 Fb} when the number of projections contains only 0.1 of the number needed for the usual tomographycal approach. It is the foundation of the information-computerized technology of the few projections tomography ICT 2-CLEAN DSA and is based exclusively on the radioastronomers papers. 1. Agafonov M.I. 1997 In ASP Conf. Ser. v.125 ADASS YI ed. G.Hunt & H.E.Payne 202. 2. Agafonov M.I. 1998 In ASP Conf. Ser. v.145 ADASS YII ed. R.Albrecht R.N.Hook & H.A.Bushouse 58. 3. Agafonov M.I. Ivanov V.P. Podvojskaya O.A. 1990 SvA. v.34 p.275.

  11. The WIPP journey to waste receipt

    International Nuclear Information System (INIS)

    Barnes, G.J.; Whatley, M.E.

    1997-01-01

    In the early 1970s the federal government selected an area in southeastern New Mexico containing large underground salt beds as potentially suitable for radioactive waste disposal. An extensive site characterization program was initiated by the federal government. This site became the Waste Isolation Pilot Plant, better known as WIPP. It is now 1997, over two decades after the initial selection of the New Mexico site as a potential radioactive waste repository. Numerous scientific studies, construction activities, and environmental compliance documents have been completed. The US Department of Energy (DOE) has addressed all relevant issues regarding the safety of WIPP and its ability to isolate radioactive waste from the accessible environment. Throughout the last two decades up to the present time, DOE has negotiated through a political, regulatory, and legal maze with regard to WIPP. New regulations have been issued, litigation initiated, and public involvement brought to the forefront of the DOE decision-making process. All of these factors combined to bring WIPP to its present status--at the final stages of working through the licensing requirements for receipt of transuranic (TRU) waste for disposal. Throughout its history, the DOE has stayed true to Congress' mandates regarding WIPP. Steps taken have been necessary to demonstrate to Congress, the State of New Mexico, and the public in general, that the nation's first radioactive waste repository will be safe and environmentally sound. DOE's compliance demonstrations are presently under consideration by the cognizant regulatory agencies and DOE is closer than ever to waste receipt. This paper explores the DOE's journey towards implementing a permanent disposal solution for defense-related TRU waste, including major Congressional mandates and other factors that contributed to program changes regarding the WIPP project

  12. Preliminary safety assessment of the WIPP facility

    International Nuclear Information System (INIS)

    Balestri, R.J.; Torres, B.W.; Pahwa, S.B.; Brannen, J.P.

    1979-01-01

    The efforts to perform a safety assessment of the WIPP facility being proposed for southeastern New Mexico are summarized. This preliminary safety assessment of the WIPP facility is limited to a consequence assessment in terms of the dose to a maximally exposed individual as a result of introducing the radionuclides into the biosphere. No attempt has been made to extend the consequences to population dose or to weight the dose with probability of the events. The general methodology, geosphere transport, and biosphere transport are described. The consequences of the various models developed to represent the loss of containment are summarized

  13. The dose-area product in DSA

    International Nuclear Information System (INIS)

    Gfirtner, H.

    1995-01-01

    In DSA, the dose-area product shows a very good correlation with the maximum incidence dose. It may therefore serve as a reliable basis for the assessment of radiation doses to patients. The dose-area product is also a useful tool for the detection pf peak shifts in the radiation curves for certain investigations. In view of the considerable scatter of the values for the dose-area product these must, however, be subjected to an additional statistical analysis. Provided that this rule is observed, the dose-area product will considerably gain in importance for the monitoring of radiation exposures of patients. A very noteworthy learning effect could be achieved, if it would be made mandatory for those statistical analyses to be carried out not only on an investigation-specific but also an investigator-specific basis. The latter is particularly true of teaching hospitals. (orig./VHE) [de

  14. A Historical Review of WIPP Backfill Development

    Energy Technology Data Exchange (ETDEWEB)

    Brush, L.H.; Krumhansl, J.L.; Molecke, M.A.; Papenguth, H.W.

    1999-07-15

    Backfills have been part of Sandia National Laboratories' [Sandia's] Waste Isolation Pilot Plant [WIPP] designs for over twenty years. Historically, backfill research at Sandia has depended heavily on the changing mission of the WIPP facility. Early testing considered heat producing, high level, wastes. Bentonite/sand/salt mixtures were evaluated and studies focused on developing materials that would retard brine ingress, sorb radionuclides, and withstand elevated temperatures. The present-day backfill consists of pure MgO [magnesium oxide] in a pelletized form and is directed at treating the relatively low contamination level, non-heat producing, wastes actually being disposed of in the WIPP. It's introduction was motivated by the need to scavenging CO{sub 2} [carbon dioxide] from decaying organic components in the waste. However, other benefits, such as a substantial desiccating capacity, are also being evaluated. The MgO backfill also fulfills a statutory requirement for assurance measures beyond those needed to demonstrate compliance with the US Environmental Protection Agency [EPA] regulatory release limits. However, even without a backfill, the WIPP repository design still operates within EPA regulatory release limits.

  15. Contamination control aspects of attaching waste drums to the WIPP Waste Characterization Chamber

    International Nuclear Information System (INIS)

    Rubick, L.M.; Burke, L.L.

    1998-01-01

    Argonne National Laboratory West (ANL-W) is verifying the characterization and repackaging of contact-handled transuranic (CH-TRU) mixed waste in support of the Waste Isolation Pilot Program (WIPP) project located in Carlsbad, New Mexico. The WIPP Waste Characterization Chamber (WCC) was designed to allow opening of transuranic waste drums for this process. The WCC became operational in March of 1994 and has characterized approximately 240 drums of transuranic waste. The waste drums are internally contaminated with high levels of transuranic radionuclides. Attaching and detaching drums to the glove box posed serious contamination control problems. Prior to characterizing waste, several drum attachment techniques and materials were evaluated. An inexpensive HEPA filter molded into the bagging material helps with venting during detachment. The current techniques and procedures used to attach and detach transuranic waste drums to the WCC are described

  16. [Design and development of the DSA digital subtraction workstation].

    Science.gov (United States)

    Peng, Wen-Xian; Peng, Tian-Zhou; Xia, Shun-Ren; Jin, Guang-Bo

    2008-05-01

    According to the patient examination criterion and the demands of all related departments, the DSA digital subtraction workstation has been successfully designed and is introduced in this paper by analyzing the characteristic of video source of DSA which was manufactured by GE Company and has no DICOM standard interface. The workstation includes images-capturing gateway and post-processing software. With the developed workstation, all images from this early DSA equipment are transformed into DICOM format and then are shared in different machines.

  17. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  18. Basic data report for drillhole WIPP 30 (Waste Isolation Pilot Plant - WIPP)

    International Nuclear Information System (INIS)

    1980-04-01

    WIPP 30 was drilled in east-central Eddy County, New Mexico, in NW 1/4, Sec. 33, T21S, R31E, to obtain drill core for the study of dissolution of near-surface rocks. The borehole encountered from top to bottom, the Dewey Lake Red Beds (449' including artificial fill for drill pad), Rustler Formation (299'), and the upper 160' of the Salado Formation. Continuous core was cut from the surface to total depth. Geophysical logs were taken the full length of the borehole to measure acoustic velocities, density, and distribution of potassium and other radioactive elements. Information from this borehole will be included in an interpretive report on dissolution in Nash Draw based on combined borehole data, surface mapping and laboratory analyses of rocks and fluids. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes and to then be converted to a repository. The WIPP will also provide research facilities for interactions between high-level waste and salt. Administration policy as of February 1980 is to hold the WIPP site in reserve until the first disposal site can be chosen from several potential sites, including the WIPP

  19. Basic data report for drillhole WIPP 30 (Waste Isolation Pilot Plant - WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    WIPP 30 was drilled in east-central Eddy County, New Mexico, in NW 1/4, Sec. 33, T21S, R31E, to obtain drill core for the study of dissolution of near-surface rocks. The borehole encountered from top to bottom, the Dewey Lake Red Beds (449' including artificial fill for drill pad), Rustler Formation (299'), and the upper 160' of the Salado Formation. Continuous core was cut from the surface to total depth. Geophysical logs were taken the full length of the borehole to measure acoustic velocities, density, and distribution of potassium and other radioactive elements. Information from this borehole will be included in an interpretive report on dissolution in Nash Draw based on combined borehole data, surface mapping and laboratory analyses of rocks and fluids. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes and to then be converted to a repository. The WIPP will also provide research facilities for interactions between high-level waste and salt. Administration policy as of February 1980 is to hold the WIPP site in reserve until the first disposal site can be chosen from several potential sites, including the WIPP.

  20. Peripheral occlusive vascular disease: Diagnostic performance of MRA and DSA

    International Nuclear Information System (INIS)

    Krug, B.; Kugel, H.; Harnischmacher, U.; Heindel, W.; Altenburg, A.; Fischbach, R.; Schmidt, R.

    1995-01-01

    In 59 patients with arterial flow disturbances 2-D inflow sequence of the abdominal and lower leg arteries were prospectively obtained on a 1.5 T MR-imager and were compared with additional DSA examinations. Supplementary Phase Contraste RSE ('Rapid Sequential Excitation') sequences were carried out in 29 patients. MRA and DSA angiograms were evaluated in random order by 4 readers using a questionnaire. The assessment of image quality were evaluated by variance analysis. Diagnostic performance of MRA and DSA was assessed by comparison of the readers' diagnostic assessments with reference diagnoses established by a radiologist and a vascular surgeon with full knowledge of all data concerning a patient. Image quality of inflow MRA was considered inferior to i.a. DSA (p [de

  1. Digital Subtraction Angiography (DSA) "Road Map": An Angiographic Tool

    Science.gov (United States)

    Turski, P. A.; Stieghorst, M. F.; Strother, C. M.; Crummy, A. B.; Lieberman, R. P.; Mistretta, C. A.

    1982-12-01

    Continuous Digital subtraction combined with intraarterial injections of contrast medium permits the display of arterial structures during real time fluoroscopy. This DSA "road map" facilitates selective catheterization and has proved useful in interventional procedures.

  2. WIPP site and vicinity geological field trip

    International Nuclear Information System (INIS)

    Chaturvedi, L.

    1980-10-01

    The Environmental Evaluation Group is conducting an assessment of the radiological health risks to people from the Waste Isolation Pilot Plant. As a part of this work, EEG is making an effort to improve the understanding of those geological issues concerning the WIPP site which may affect the radiological consequences of the proposed repository. One of the important geological issues to be resolved is the timing and the nature of the dissolution processes which may have affected the WIPP site. EEG organized a two-day conference of geological scientists, on January 17-18, 1980. On the basis of the January conference and the June field trip, EEG has formed the following conclusions: (1) it has not been clearly established that the site or the surrounding area has been attacked by deep dissolution to render it unsuitable for the nuclear waste pilot repository; (2) the existence of an isolated breccia pipe at the site unaccompanied by a deep dissolution wedge, is a very remote possibility; (3) more specific information about the origin and the nature of the brine reservoirs is needed. An important question that should be resolved is whether each encounter with artesian brine represents a separate pocket or whether these occurrences are interconnected; (4) Anderson has postulated a major tectonic fault or a fracture system at the Basin margin along the San Simon Swale; (5) the area in the northern part of the WIPP site, identified from geophysical and bore hole data as the disturbed zone, should be further investigated to cleary understand the nature and significance of this structural anomaly; and (6) a major drawback encountered during the discussions of geological issues related to the WIPP site is the absence of published material that brings together all the known information related to a particular issue

  3. The WIPP transportation system: Demonstrated readiness

    International Nuclear Information System (INIS)

    Ward, T.R.; Spooner, R.

    1991-01-01

    The Department of Energy (DOE) has developed an integrated transportation system to transport transuranic (TRU) waste from ten widely-dispersed generator sites to the Waste Isolation Pilot Plant (WIPP). The system consists of a Type B container, a specially-designed trailer, a lightweight tractor, the DOE ''TRANSCOM'' vehicle tracing system, and uniquely qualified and highly-trained drivers. In June of 1989, the National Academy of Sciences reviewed the transportation system and concluded that: ''The system proposed for transportation of TRU waste to WIPP is safer than that employed for any other hazardous material in the United States today and will reduce risk to very low levels.'' The next challenge facing the DOE was demonstrating that this system was ready to transport the TRU waste to the WIPP site in the safest manner possible. Not only did the DOE feel that it was necessary to convince itself that the system was safe, but also representatives of the 23 states through which it traveled

  4. The WIPP transportation system: Demonstrated readiness

    International Nuclear Information System (INIS)

    Ward, T.R.; Spooner, R.

    1991-01-01

    The Department of Energy (DOE) has developed an integrated transportation system to transport transuranic (TRU) waste from ten widely-dispersed generator sites to the Waste Isolation Pilot Plant (WIPP). The system consists of a Type B container, a specially- designed trailer, a lightweight tractor, the DOE ''TRANSCOM'' vehicle tracking system, and uniquely qualified and highly-trained drivers. In June of 1989, the National Academy of Sciences reviewed the transportation system and concluded that: ''The system proposed for transportation of TRU waste to WIPP is safer than that employed for any other hazardous material in the United States today and will reduce risk to very low levels'' (emphasis added). The next challenge facing the DOE was demonstrating that this system was ready to transport the TRU waste to the WIPP site efficiently and in the safest manner possible. Not only did the DOE feel that is was necessary to convince itself that the system was safe, but also representatives of the 20 states through which it would travel

  5. Basic data report for drillhole WIPP 32 (Waste Isolation Pilot Plant - WIPP)

    International Nuclear Information System (INIS)

    1980-11-01

    WIPP 32 is an exploratory borehole drilled to examine the subsurface at a small topographic high in Nash Draw. The borehole is located in east-central Eddy County, New Mexico, in NE 1/4 SE 1/4 Sec. 33, T.22S., R.29E. and was drilled in August, 1979. The hole was drilled to a depth of 390 feet, and encountered, from top to bottom, the Rustler Formation (166') and the upper Salado Formation (224'). Core was taken from 4 to 353 feet. Geophysical logs were run the full length of the hole to measure formation properties. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes. The WIPP will also provide facilities to research interactions between high-level waste and salt

  6. WIPP conceptual design report. Addendum L. Mine safety code review for Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1977-06-01

    An initial review of New Mexico and Federal mining standards and regulations has been made to determine their applicability to the WIPP conceptual design. These standards and regulations are reviewed point by point and the enclosed listing includes comments and recommendations for those which will affect the design and/or eventual operations of WIPP. The majority of the standards, both federal and state, are standard safe mining practices. Those standards are listed which are thought should be emphasized for development of the design; also those that would increase the hazard risk by strict compliance. Because the WIPP facility is different in many respects from mines for which the regulations were intended, strict compliance in some respects would provide an increased hazard, while in other instances the regulations are less strict than is desirable. These are noted in the attached review

  7. 9+ years of disposal experience at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Rempe, Norbert T.; Nelson, Roger A.

    2008-01-01

    With almost a decade of operating experience, the Waste Isolation Pilot Plant (WIPP) has established an enviable record by clearly demonstrating that a deep geologic repository for unconditioned radioactive waste in rock salt can be operated safely and in compliance with very complex regulations. WIPP has disposed of contact-handled transuranic (TRU) waste since 1999 and remote-handled TRU waste since 2007. Emplacement methods range from directly stacking unshielded 0.21-4.5 m 3 containers inside disposal rooms to remotely inserting highly radioactive 0.89 m 3 canisters into horizontally drilled holes (shield plugs placed in front of canisters protect workers inside active disposal rooms). More than 100 000 waste containers have been emplaced, and one-third of WIPP's authorized repository capacity of 175,000 m 3 has already been consumed. Principal surface operations are conducted in the waste handling building, which is divided into CH and RH waste handling areas. Four vertical shafts extend from the surface to the disposal horizon, 655 m below the surface in a 1000 m thick sequence of Permian bedded salt. The waste disposal area of about 0.5 km 2 is divided into ten panels, each consisting of seven rooms. Vertical closure (creep) rates in disposal rooms range up to 10 cm per year. While one panel is being filled with waste, the next one is being mined. Mined salt is raised to the surface in the salt shaft, and waste is lowered down the waste shaft. Both of these shafts also serve as principal access for personnel and materials. Underground ventilation is divided into separate flow paths, allowing simultaneous mining and disposal. A filter building near the exhaust shaft provides the capability to filter the exhaust air (in reduced ventilation mode) through HEPA filters before release to the atmosphere. WIPP operations have not exposed employees or the public to radiation doses beyond natural background variability. They consistently meet or exceed regulatory

  8. Basic data report for drillhole WIPP 19 (Waste Isolation Pilot Plant-WIPP)

    International Nuclear Information System (INIS)

    1980-03-01

    WIPP 19 is an exploratory borehole whose objective was to determine the nature of the near-surface formations after seismic information indicated a possible fault. The borehole is located in section 20, T.22S., R.31E., in eastern Eddy County, New Mexico, and was drilled between April 6 and May 4, 1978. The hole was drilled to a depth of 1038.2 feet and encountered, from top to bottom, surficial Holocene deposits (7', including artificial fill for drill pad), the Mescalero caliche (7'), the Santa Rosa Sandstone (82'), the Dewey Lake Red Beds (494'), the Rustler Formation (315'), and the upper portion of the Salado Formation (143'). Cuttings were collected at 10-foot intervals. A suite of geophysical logs was run to measure acoustic velocities, density, and radioactivity. On the basis of comparison with other geologic sections drilled in the area, the WIPP 19 section is a normal stratigraphic sequence and it does not show structural disruption. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes. The WIPP will also provide facilities to research interactions between high-level waste and salt

  9. Basic data report for Drillhole WIPP 22 (Waste Isolation Pilot Plant, WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    WIPP 22 is an exploratory borehole whose objective is to determine the nature of the near-surface formations after seismic information indicated a possible fault. The borehole is located in section 20, T.22S., R.31E., in eastern Eddy County, New Mexico, and was drilled between March 14 and 30, 1978. The hole was drilled to a depth of 1448 feet and encountered, from top to bottom, surficial Holocene deposits (6', including artificial fill for drill pad), the Mescalero caliche (7'), the Santa Rosa Sandstone (68'), the Dewey Lake Red Beds (492'), the Rustler Formation (311'), and the upper portion of the Salado Formation (565'). Cuttings were collected at 10-foot intervals. A suite of geophysical logs was run to measure acoustic velocities, density, and radioactivity. On the basis of comparison with other geologic sections drilled in the area, the WIPP 22 section is a normal stratigraphic sequence and it does not show structural disruption. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes. The WIPP will also provide facilities to research interactions between high-level waste and salt.

  10. Basic data report for drillhole WIPP 21 (Waste Isolation Pilot Plant - WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    WIPP 21 is an exploratory borehole whose objective is to determine the nature of the near-surface formations after seismic information indicated a possible fault. The borehole is located in section 20, T.22S., R.31E., in eastern Eddy County, New Mexico, and was drilled between May 24 and 26, 1978. The hole was drilled to a depth of 1046 feet and encountered, from top to bottom, surficial Holocene deposits (6', including artificial fill for drill pad), the Mescalero caliche (6'), the Santa Rosa Sandstone (34'), the Dewey Lake Red Beds (487'), the Rustler Formation (308'), and the upper portion of the Salado Formation (178'). Cuttings were collected at 10-foot intervals. A suite of goephysical logs was run to measure acoustic velocities, density, and radioactivity. On the basis of comparison with other geologic sections drilled in the area, the WIPP 21 section is a normal stratigraphic sequence and it does not show structural disruption. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes. The WIPP will also provide facilities to research interactions between high-level waste and salt.

  11. Basic data report for Drillhole WIPP 28 (Waste Isolation Pilot Plant - WIPP)

    International Nuclear Information System (INIS)

    1979-08-01

    WIPP 28 was drilled in Nash Draw (NE 1/4, sec. 18, T.21S., R.31E.) in Eddy County, New Mexico, to determine subsurface stratigraphy and examine dissolution features above undisturbed salt in the Salado Formation. Determination of dissolution rates will refine previous estimates and provide short-term (geologically) rates for WIPP risk assessments. The borehole encountered, from top to bottom, Mescalero caliche (12 ft with fill material for pad), Dewey Lake Red Beds (203 ft), Rustler Formation (316 ft), and the upper 270 ft of the Salado Formation. A dissolution residue, 58 ft thick, is at the top of the Salado Formation overlying halite-rich beds. In addition to obtaining nearly continuous core from the surface to total depth (801 ft), geophysical logs were taken to measure acoustic velocities, density, radioactivity, and formation resistivity. An interpretive report on dissolution in Nash Draw will be based on combined borehole basin data, surface mapping, and laboratory analyses of Nash Draw rocks and fluids. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes and to then be converted to a repository. The WIPP will also provide research facilities for interactions between high-level waste and salt

  12. Basic data report for drillhole WIPP 26 (Waste Isolation Pilot Plant - WIPP)

    International Nuclear Information System (INIS)

    1979-08-01

    WIPP 26 was drilled in Nash Draw (SE 1/4 NE 1/4, sec. 29, T22S, R30E) in Eddy County, New Mexico, to determine subsurface stratigraphy and examine dissolution features above undisturbed salt in the Salado Formation. Determination of dissolution rates will refine previous estimates and provide short-term (geologically) rates for WIPP risk assessments. The borehole encountered, from top to bottom, surficial deposits (10 ft with full materials for pad), Rustler Formation (299 ft), and the upper 194 ft of the Salado Formation. A dissolution residue, 11 ft thick, is at the top of the Salado Formation overlying halite-rich beds. In addition to obtaining nearly continuous core from the surface to total depth (503 ft), geophysical logs were taken to measure acoustic velocities, density, radioactivity, and formation resistivity. An interpretive report on dissolution in Nash Draw will be based on combined borehole basin data, surface mapping, and laboratory analyses of Nash Draw rocks and fluids. The WIPP is to demonstrate (through limited operations) disposal technology for transuranic defense wastes and to then be converted to a repository. The WIPP will also provide research facilities for interactions between high-level waste and salt

  13. WIPP conceptual design report. Addendum A. Design calculations for Waste Isolation Pilot Plant (WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The design calculations for the Waste Isolation Pilot Plant (WIPP) are presented. The following categories are discussed: general nuclear calculations; radwaste calculations; structural calculations; mechanical calculations; civil calculations; electrical calculations; TRU waste surface facility time and motion analysis; shaft sinking procedures; hoist time and motion studies; mining system analysis; mine ventilation calculations; mine structural analysis; and miscellaneous underground calculations.

  14. WIPP: construction and progress on a successful nuclear waste repository

    International Nuclear Information System (INIS)

    Cooper, W.R.; Sankey, C.A.

    1985-01-01

    The Department of Energy is constructing the Waste Isolation Pilot Plant (WIPP) in Southeastern New Mexico. The facility will retrievably store transuranic waste from defense activities of the United States and conduct experiments with Defense high-level waste which will be retrieved at the end of the experiments. This paper describes the progress and the present status of activities at WIPP. 4 refs

  15. WIPP Magnesium Oxide (MgO) - Planned Change Request

    Science.gov (United States)

    On April 10, 2006, the DOE submitted a planned change request pertaining to the amount of MgO emplaced in the WIPP repository. MgO is an engineered barrier that DOE included as part of the original WIPP Certification Decision.

  16. Achieving WIPP certification for software. A white paper

    International Nuclear Information System (INIS)

    Matthews, S.D.; Adams, K.; Twitchell, K.E.

    1998-07-01

    The NMT-1 and NMT-3 organizations within the Chemical and Metallurgical Research (CMR) facility at the Los Alamos National Laboratory (LANL) is working to achieve Waste Isolation Pilot Plant (WIPP) certification to enable them to transport their TRU waste to WIPP. In particular, the NMT-1 management is requesting support from the Idaho National Engineering and Environmental Laboratory (INEEL) to assist them in making the Laboratory Information Management System (LIMS) software WIPP certifiable. Thus, LIMS must be compliant with the recognized software quality assurance (SQA) requirements stated within the QAPD. Since the Idaho National Engineering and Environmental Laboratory (INEEL) has achieved WIPP certification, INEEL personnel can provide valuable assistance to LANL by sharing lessons learned and recommendations. Thus, this white paper delineates the particular software quality assurance requirements required for WIPP certification

  17. Evaluation of DSA test phantoms commercially available in the UK

    International Nuclear Information System (INIS)

    Cowen, A.R.; Coleman, N.J.; HArtley, P.J.

    1985-01-01

    Several digital subtraction angiography systems have been installed in the United Kingdom. Many others will no doubt be installed over the next few years. Given the high cost and technical complexity of DSA systems it is natural that the purchasers of such equipment should be concerned that their machine has been adjusted correctly prior to clinical acceptance and continues to operate satisfactorily thereafter. In response to these concerns several companies in the U.K. are now selling DSA test phantoms. All DSA phantoms which are currently commercially available are manufactured in the U.S.A. Im order to assess the effectiveness of these phantoms the DHSS has initiated the assessment project described here. The findings are tabulated . Performance is indicated by a star rating system, based on the opinions of two X-ray engineers and one medical physicist. (author)

  18. The clinical application of inferior vena caval CO2-DSA

    International Nuclear Information System (INIS)

    Guo Jinhe; Teng Gaojun; Zhu Guangyu; Li Guozhao; Fang Wen; He Shicheng; Deng Tang

    2007-01-01

    Objective: To explore the feasibility and safety of inferior vena caval CO 2 -DSA and evaluate the results of inferior vena cavography using CO 2 -DSA or iodinated contrast media. Methods: 25 patients diagnosed as deep venous thrombosis of lower limb were prepared to conceive the implantation of inferior vena caval filter. The inferior vena cava and right renal vein CO 2 -DSA and iodinated contrast media DSA were carried out through jugular or femoral vein approach in all patients. Results: The inferior vena caval angiography with CO 2 -DSA or iodinated contrast media were carried out successfully in all patients. The quality of the inferior vena caval angiogram showed: with CO 2 as contrast media, 14 cases obtained excellent images and 11 cases had good images; with iodinated contrast media the images of 18 cases were excellent and 7 cases were good. No thrombus and variation of inferior vena cava were found by the two kinds of angiography. The diameter of inferior vena cava showed: (20.01 ± 0.83) mm with CO 2 contrast media and (20.15 ± 0.92) mm with iodinated contrast media, (P=0.006); having statistical significance between them. The safety of angiography with CO 2 presented only 1 case with transient slight decrease of O 2 saturation. No abnormal changes were found in blood pressure, heart rate and so on. Conclusions: Inferior vena caval CO 2 -DSA is feasible and safe, with statistical significance in the measurement of inferior vena caval diameter comparing with iodinated contrast material but with no influence on the implantation of filter. (authors)

  19. Science to compliance: The WIPP success story

    International Nuclear Information System (INIS)

    Howarth, S.M.; Chu, M.S.; Shephard, L.E.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed to provide in-depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. The success of the program, however, is defined by the regulator in the context of compliance with performance criteria, rather than by the in-depth technical understanding typical of most scientific programs. The WIPP project was successful in making a transformation from science to compliance by refocusing and redirecting programmatic efforts toward the singular goal of meeting regulatory compliance requirements while accelerating the submittal of the Compliance Certification Application (CCA) by two months from the April 1994 Disposal Decision Plan (DDP) date of December 1996, and by reducing projected characterization costs by more than 40%. This experience is unparalleled within the radioactive waste management community and has contributed to numerous lessons learned from which the entire community can benefit

  20. WIPP shaft seal system parameters recommended to support compliance calculations

    International Nuclear Information System (INIS)

    Hurtado, L.D.; Knowles, M.K.; Kelley, V.A.; Jones, T.L.; Ogintz, J.B.; Pfeifle, T.W.

    1997-12-01

    The US Department of Energy plans to dispose of transuranic waste at the Waste Isolation Pilot Plant (WIPP), which is sited in southeastern New Mexico. The WIPP disposal facility is located approximately 2,150 feet (650 m) below surface in the bedded halite of the Salado Formation. Prior to initiation of disposal activities, the Department of Energy must demonstrate that the WIPP will comply with all regulatory requirements. Applicable regulations require that contaminant releases from the WIPP remain below specified levels for a period of 10,000 years. To demonstrate that the WIPP will comply with these regulations, the Department of Energy has requested that Sandia National Laboratories develop and implement a comprehensive performance assessment of the WIPP repository for the regulatory period. This document presents the conceptual model of the shaft sealing system to be implemented in performance assessment calculations conducted in support of the Compliance Certification Application for the WIPP. The model was developed for use in repository-scale calculations and includes the seal system geometry and materials to be used in grid development as well as all parameters needed to describe the seal materials. These calculations predict the hydrologic behavior of the system. Hence conceptual model development is limited to those processes that could impact the fluid flow through the seal system

  1. WIPP shaft seal system parameters recommended to support compliance calculations

    Energy Technology Data Exchange (ETDEWEB)

    Hurtado, L.D.; Knowles, M.K. [Sandia National Labs., Albuquerque, NM (United States); Kelley, V.A.; Jones, T.L.; Ogintz, J.B. [INTERA Inc., Austin, TX (United States); Pfeifle, T.W. [RE/SPEC, Inc., Rapid City, SD (United States)

    1997-12-01

    The US Department of Energy plans to dispose of transuranic waste at the Waste Isolation Pilot Plant (WIPP), which is sited in southeastern New Mexico. The WIPP disposal facility is located approximately 2,150 feet (650 m) below surface in the bedded halite of the Salado Formation. Prior to initiation of disposal activities, the Department of Energy must demonstrate that the WIPP will comply with all regulatory requirements. Applicable regulations require that contaminant releases from the WIPP remain below specified levels for a period of 10,000 years. To demonstrate that the WIPP will comply with these regulations, the Department of Energy has requested that Sandia National Laboratories develop and implement a comprehensive performance assessment of the WIPP repository for the regulatory period. This document presents the conceptual model of the shaft sealing system to be implemented in performance assessment calculations conducted in support of the Compliance Certification Application for the WIPP. The model was developed for use in repository-scale calculations and includes the seal system geometry and materials to be used in grid development as well as all parameters needed to describe the seal materials. These calculations predict the hydrologic behavior of the system. Hence conceptual model development is limited to those processes that could impact the fluid flow through the seal system.

  2. Geotechnical Perspectives on the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Francke, Chris T.; Hansen, Frank D.; Knowles, M. Kathyn; Patchet, Stanley J.; Rempe, Norbert T.

    1999-01-01

    The Waste Isolation Pilot Plant (WIPP) is the first nuclear waste repository certified by the United States Environmental Protection Agency. Success in regulatory compliance resulted from an excellent natural setting for such a repository, a facility with multiple, redundant safety systems, and from a rigorous, transparent scientific and technical evaluation. The WIPP story, which has evolved over the past 25 years, has generated a library of publications and analyses. Details of the multifaceted program are contained in the cited references. Selected geotechnical highlights prove the eminent suitability of the WIPP to serve its congressionally mandated purpose

  3. DSA diagnosis and interventional management of postoperative bleeding

    International Nuclear Information System (INIS)

    Li Yuwei; Zhang Fuqiang; Li Yunhui; Yuan Liang; Si Guangyan; Liu Lili

    2009-01-01

    Objective: To discuss the clinical application of DSA and interventional management in diagnosing and treating the bleeding after surgery. Methods: The clinical data and the interventional management of 14 patients with DSA-proved postoperative bleeding, encountered during the period of Aug. 2005-Jan. 2008, were retrospectively analyzed. The surgeries included subtotal gastrectomy (n=4), pancreatoduodenectomy (n=3), cesarean section (n=2), nephrolithotomy (n=3), heminephrectomy (n=1), internal hemorrhoidectomy (n=1). Results: Seventeen arterial bleeding sites were demonstrated, including gastroduodenal (n=2), left gastric (n=4), phrenic (n=1), short gastric (n=1), superior mesenteric (n=2), renal (n=4), uterine (n=2) and internal pudendal (n=1) artery. The diagnosis was confirmed with DSA in all 14 patients, of which embolization was successfully carried out in 13 in one session (92.8%). The remaining one case had to be operated again to stop the bleeding because of the failure of the superselective catheterization. No serious complications, such as organ necrosis or visceral dysfunction, occurred. Conclusion: As a safe, minimally-invasive and effective technique, DSA and interventional management are very helpful in diagnosing and treating the bleeding after surgery. (authors)

  4. WIPP/SRL in-situ tests

    International Nuclear Information System (INIS)

    Mamsey, W.G.

    1990-01-01

    The Materials Interface Interactions Test (MIIT) is the only in-situ program involving the burial of simulated high-level waste forms operating in the United States. Fifteen glass and waste form compositions and their proposed package materials, supplied by 7 countries, are interred in salt at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. A joint effort between Sandia National Laboratories and Savannah River Laboratory, MIIT is the largest international cooperative in-situ venture yet undertaken. The objective of the current study is to document the waste form compositions used in the MIIT program and then to examine compositional correlations based on structural considerations, bonding energies, and surface layer formation. These correlations show important similarities between the many different waste glass compositions studied world wide and suggest that these glasses would be expected to perform well and in a similar manner

  5. The WIPP transportation system: Dedicated to safety

    International Nuclear Information System (INIS)

    Ward, T.; McFadden, M.

    1993-01-01

    When developing a transportation system to transport transuranic (TRU) waste from ten widely-dispersed generator sites, the Department of Energy (DOE) recognized and addressed many challenges. Shipments of waste to the Waste Isolation Pilot Plant (WIPP) were to cover a twenty-five year period and utilize routes covering over twelve thousand miles in twenty-three states. Enhancing public safety by maximizing the payload, thus reducing the number of shipments, was the primary objective. To preclude the requirement for overweight permits, the DOE started with a total shipment weight limit of 80,000 pounds and developed an integrated transportation system consisting of a Type ''B'' package to transport the material, a lightweight tractor and trailer, stringent driver requirements, and a shipment tracking system referred to as ''TRANSCOM''

  6. Radionuclide transport in sandstones with WIPP brine

    International Nuclear Information System (INIS)

    Weed, H.C.; Bazan, F.; Fontanilla, J.; Garrison, J.; Rego, J.; Winslow, A.M.

    1981-02-01

    Retardation factors (R) have been measured for the transport of 3 H, /sup 95m/Tc, and 85 Sr in WIPP brine using St. Peter, Berea, Kayenta, and San Felipe sandstone cores. If tritium is assumed to have R=1, /sup 95m/Tc has R=1.0 to 1.3 and therefore is essentially not retarded. Strontium-85 has R = 1.0 to 1.3 on St. Peter, Berea, and Kayenta, but R=3 on San Felipe. This is attributed to sorption on the matrix material of San Felipe, which has 45 volume % matrix compared with 1 to 10 volume % for the others. Retardation factors (R/sub s/) for 85 Sr calculated from static sorption measurements are unity for all the sandstones. Therefore, the static and transport results for 85 Sr disagree in the case of San Felipe, but agree for St. Peter, Berea, and Kayenta

  7. CT angiography versus intraarterial DSA in abdominal aortic aneurysms; CT-Angiographie versus intraarterielle DSA bei Bauchaortenaneurysmen

    Energy Technology Data Exchange (ETDEWEB)

    Rieker, O. [Klinik fuer Radiologie, Johannes-Gutenberg-Universitaet, Mainz (Germany); Dueber, C. [Klinik fuer Radiologie, Johannes-Gutenberg-Universitaet, Mainz (Germany); Schmiedt, W. [Klinik fuer Herz-, Thorax- und Gefaesschirurgie, Johannes-Gutenberg-Universitaet, Mainz (Germany); Neufang, A. [Klinik fuer Herz-, Thorax- und Gefaesschirurgie, Johannes-Gutenberg-Universitaet, Mainz (Germany); Pittow, M. [Klinik fuer Radiologie, Johannes-Gutenberg-Universitaet, Mainz (Germany); Schweden, F. [Klinik fuer Radiologie, Johannes-Gutenberg-Universitaet, Mainz (Germany)

    1996-07-01

    To evaluate if CT angiography is able to image all features necessary for the preoperative planning of abdominal aortic aneurysms (accessory renal arteries, stenoses or occlusions of renal and iliac arteries, patency of inferior mesentric artery). CT angiography and DSA were performed on 27 patients with abdominal aortic aneurysms. CT angiography was performed using a protocol that covered the abdominal aorta and the pelvic arteries with a single spiral acquisition (contrast dose: 150 ml, collimation: 5 mm, table feed: 7.5 mm/s, increment of reconstruction: 2 mm). Maximum intensity projections (MIP) and axial scans were compared with the results of intraarterial DSA. Using axial scans and subvolume MIP, CTA accurately defined 7/8 accessory renal arteries, 13/13 occlusions and 9/12 high grade stenoses of renal and pelvic arteries. High-grade stenoses of the iliac arteries were underestimated in two cases and overlooked in one case. CT angiography was superior to DSA in imaging the inferior mesenteric artery. CT angiography precisely diagnosed 33 aneurysms of the iliac, renal and coeliac arteries. CT angiography using a single administration of intravenous contrast may replace preoperative DSA in most cases of abdominal aortic aneurysm. (orig.) [Deutsch] Ziel dieser Studie war es zu pruefen, ob mit der CT-Angiographie die fuer die praeoperative Planung von Bauchaortenaneurysmen relevanten Gefaessveraenderungen darstelbar sind (Akzessorische Nierenarterien, Nierenarterienstenosen, A. mesenterica inferior, Beckenarterien). Die CT-Angiographien wurden mit einem Protokoll durchgefuehrt, das die Bauchaorta und die Beckenarterien bis zur Leiste mit einer einzigen Spiralakquisition erfasst (150 ml Kontrastmittel, Kollimation: 5 mm, Tischvorschub: 7,5 mm/s, Rekonstruktionsintervall: 2 mm). Die Befunde aus Maximum-Intensitaets-Projektionen (MIP) und den axialen Schnittbildern wurden mit den Befunden der intraarteriellen DSA bei 27 Patienten verglichen. Bei Hinzuziehung von

  8. Environmental monitoring and cooperative resource management at the WIPP site

    International Nuclear Information System (INIS)

    1992-01-01

    This poster session by the Environmental Monitoring Section of the US DOE Waste Isolation Pilot Plant is to demonstrate that the DOE is committed to sound environmental management. This WIPP poster session demonstrates radiological as well as nonradiological environmental monitoring activities conducted routinely at the WIPP. And how data collected prior to the WIPP being operational is used to establish a preoperational baseline for environmental studies in which the samples collected during the operational phase will be compared. Cooperative Resource Management is a relatively new concept for governments agencies. It allows two or more agencies the ability to jointly share in funding a program or project and yet both agencies can benefit from the outcome. These programs are usually a biological type study. The WIPP cooperative agreement between the US BLM, DOE and its contractors is to continue the ongoing documentation of the diversity of the Chihuahuan desert

  9. New Payload Initiatives for Shipments to WIPP Will Expand DoE's Ability to Dispose of Transuranic Waste

    International Nuclear Information System (INIS)

    Nelson, R.A.; White, D.S.

    2009-01-01

    The Waste Isolation Pilot Plant (WIPP) shipping and disposal operations currently employ two different disposal methods: one for Contact Handled (CH) waste and another for Remote Handled (RH) waste. CH waste is emplaced in a variety of payload container configurations on the floor of each disposal room. In contrast, RH waste is packaged into a single type of canister and emplaced in pre-drilled holes in the walls of disposal rooms. CH waste containers are shipped to WIPP in unshielded Type B packages licensed by the Nuclear Regulatory Commission (NRC), whereas RH waste is shipped in similarly licensed shielded packages that also include lead to attenuate higher energy gamma photons to meet transportation dose limits. Because the lead employed in the existing shipping packages (called the RH-72B) does not attenuate neutrons, this transportation and disposal system is not able to accommodate neutron emitting waste streams. Recently, DOE proposed the use of gamma-shielded containers that would allow packaging of gamma-emitting RH waste in a configuration that could be shipped in a CH shipping package and emplaced on the floor of WIPP disposal rooms, while still being counted against repository capacity limits as RH waste. The gamma-shielded containers can be handled by contact. The NRC reviewed the license application for these gamma-shielded containers and the approval is pending, but expected at the end of 2008. Concurrent with the submission to NRC, DOE submitted a planned change request to the U.S. Environmental Protection Agency to allow the placement of the gamma shielded containers in the repository with other CH waste. This paper presents an update of the status of DoE's gamma-shielded container initiative. In addition to the gamma-shielded container, to increase the versatility of the RH shipping process, the Department of Energy (DOE) is considering the development of a new method to shield neutron-emitting waste, which would be shipped and emplaced using

  10. Electrochemical treatment of tannery wastewater using DSA electrodes

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Carla Regina [Departamento de Quimica, Faculdade de Filosofia, Ciencias e Letras de Ribeirao Preto, Universidade de Sao Paulo, CEP 14049-901 Ribeirao Preto, SP (Brazil); Botta, Clarice M.R.; Espindola, Evaldo L.G. [Nucleo de Estudos em Ecossistemas Aquaticos, Centro de Recursos Hidricos e Ecologia Aplicada, Escola de Engenharia de Sao Carlos, Universidade de Sao Paulo, CP 292, CEP 13560-970 Sao Carlos, SP (Brazil); Olivi, Paulo [Departamento de Quimica, Faculdade de Filosofia, Ciencias e Letras de Ribeirao Preto, Universidade de Sao Paulo, CEP 14049-901 Ribeirao Preto, SP (Brazil)], E-mail: olivip@ffclrp.usp.br

    2008-05-01

    In this work we studied the electrochemical treatment of a tannery wastewater using dimensionally stable anodes (DSA) containing tin, iridium, ruthenium, and titanium. The electrodes were prepared by thermal decomposition of the polymeric precursors. The electrolyses were performed under galvanostatic conditions, at room temperature. Effects of the oxide composition, current density, and effluent conductivity were investigated, and the current efficiency was calculated as a function of the time for the performed electrolyses. Results showed that all the studied electrodes led to a decrease in the content of both total phenolic compounds and total organic carbon (TOC), as well as lower absorbance in the UV-vis region. Toxicity tests using Daphnia similis demonstrated that the electrochemical treatment reduced the wastewater toxicity. The use of DSA type electrodes in the electrochemical treatment of tannery wastewater proved to be useful since it can promote a decrease in total phenolic compounds, TOC, absorbance, and toxicity.

  11. A Technique For Automatic Motion Correction In DSA

    Science.gov (United States)

    Pickens, David R.; Fitzpatrick, J. M.; Grefenstette, John J.; Price, Ronald R.; James, A. E., Jr.

    1986-06-01

    The motion of the contracting heart has made it impossible to study coronary arteries with venous injections of contrast using digital subtraction angiography (DSA), even with cardiac gating. Furthermore, for intravenous injections, the images are statistically very poor due to the small size of the vessels and dilution of the contrast media, rendering the images diagnostically useless. A technique based on polynomial transformations has been implemented and is being evaluated which permits removal of motion between a pair of images acquired during mask-mode DSA. This technique is capable of handling three-dimensional motion and is based on applications of techniques of fluid dynamics, statistical sampling theory, and artificial intelligence. A series of phantom images, exhibiting three dimensional motion, are shown which demonstrate the ability of the technique to remove motion.

  12. Electrochemical treatment of tannery wastewater using DSA electrodes

    International Nuclear Information System (INIS)

    Costa, Carla Regina; Botta, Clarice M.R.; Espindola, Evaldo L.G.; Olivi, Paulo

    2008-01-01

    In this work we studied the electrochemical treatment of a tannery wastewater using dimensionally stable anodes (DSA) containing tin, iridium, ruthenium, and titanium. The electrodes were prepared by thermal decomposition of the polymeric precursors. The electrolyses were performed under galvanostatic conditions, at room temperature. Effects of the oxide composition, current density, and effluent conductivity were investigated, and the current efficiency was calculated as a function of the time for the performed electrolyses. Results showed that all the studied electrodes led to a decrease in the content of both total phenolic compounds and total organic carbon (TOC), as well as lower absorbance in the UV-vis region. Toxicity tests using Daphnia similis demonstrated that the electrochemical treatment reduced the wastewater toxicity. The use of DSA type electrodes in the electrochemical treatment of tannery wastewater proved to be useful since it can promote a decrease in total phenolic compounds, TOC, absorbance, and toxicity

  13. Contrast-enhanced 3D MR DSA for intracranial vessels

    Energy Technology Data Exchange (ETDEWEB)

    Tominaga, Satoru; Ishikura, Reiichi; Ando, Kumiko; Morikawa, Tsutomu; Nakao, Norio [Hyogo Coll. of Medicine, Nishinomiya (Japan); Ikeda, Jyota

    1999-12-01

    We performed serial scans of ultrafast 3D MR angiography sequence which was improved to shorten acquisition time by means of zero-filling interpolation after injection of the contrast medium and called it contrast-enhanced three-dimensional (3D) magnetic resonance (MR) digital subtraction angiography (DSA). The parameters were 3.8/1.3/35 (TR/TE/flip angle), a slab thickness of 60 mm, a voxel size of 2.3 x 1.2 x 3.7 mm, a scan time of 2.9 s. The measurement was sequentially performed for 10 to 15 times after administration of 0.1 mmol/kg of Gd-DTPA. Total acquisition time was almost 30 to 45 s. All images of each set were subtracted with precontrast images and then the maximum intensity projection (MIP) were performed. In all cases, contrast-enhanced 3D MR DSA could clearly depict sequential change of the cranial vessels from the arterial phase to the venous phase. The view from different angle on any phase could be obtained and stereoscopic view was possible. The time intensity curve was obtained from signal intensity measured on the source images. The combination of conventional 3D TOF MRA with contrast-enhanced 3D MR DSA was the useful study which could replace cerebral angiography. (author)

  14. Real-world experimentation of distributed DSA network algorithms

    DEFF Research Database (Denmark)

    Tonelli, Oscar; Berardinelli, Gilberto; Tavares, Fernando Menezes Leitão

    2013-01-01

    The problem of spectrum scarcity in uncoordinated and/or heterogeneous wireless networks is the key aspect driving the research in the field of flexible management of frequency resources. In particular, distributed dynamic spectrum access (DSA) algorithms enable an efficient sharing of the availa......The problem of spectrum scarcity in uncoordinated and/or heterogeneous wireless networks is the key aspect driving the research in the field of flexible management of frequency resources. In particular, distributed dynamic spectrum access (DSA) algorithms enable an efficient sharing...... of the available spectrum by nodes in a network, without centralized coordination. While proof-of-concept and statistical validation of such algorithms is typically achieved by using system level simulations, experimental activities are valuable contributions for the investigation of particular aspects...... such as a dynamic propagation environment, human presence impact and terminals mobility. This chapter focuses on the practical aspects related to the real world-experimentation with distributed DSA network algorithms over a testbed network. Challenges and solutions are extensively discussed, from the testbed design...

  15. Waste Isolation Pilot Plant (WIPP) fact sheet

    International Nuclear Information System (INIS)

    1993-01-01

    Pursuant to the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA), as amended (42 USC 6901, et seq.), and the New Mexico Hazardous Waste Act (Section 74-4-1 et seq., NMSA 1978), Permit is issued to the owner and operator of the US DOE, WIPP site (hereafter called the Permittee(s)) to operate a hazardous waste storage facility consisting of a container storage unit (Waste Handling Building) and two Subpart X miscellaneous below-ground storage units (Bin Scale Test Rooms 1 and 3), all are located at the above location. The Permittee must comply with all terms and conditions of this Permit. This Permit consists of the conditions contained herein, including the attachments. Applicable regulations cited are the New Mexico Hazardous Waste Management Regulations, as amended 1992 (HWMR-7), the regulations that are in effect on the date of permit issuance. This Permit shall become effective upon issuance by the Secretary of the New Mexico Environment Department and shall be in effect for a period of ten (10) years from issuance. This Permit is also based on the assumption that all information contained in the Permit application and the administrative record is accurate and that the activity will be conducted as specified in the application and the administrative record. The Permit application consists of Revision 3, as well as associated attachments and clarifying information submitted on January 25, 1993, and May 17, 1993

  16. Basic data report for drillhole WIPP 15 (Waste Isolation Pilot Plant-WIPP)

    International Nuclear Information System (INIS)

    1981-11-01

    WIPP 15 is a borehole drilled in Marformation.h, 1978, in section 18, T.23S., R. 35E. of south-central Lea County. The purpose of WIPP 15 was to examine fill in San Simon Sink in order to extract climatic information and to attempt to date the collapse of the sink. The borehole was cored to total depth (810.5 feet) and encountered, from top to bottom, Quaternary calcareous clay, marl and sand, the claystones and siltstones of the Triassic Santa Rosa Formation. Neutron and gamma ray geophysical logs were run to measure density and radioactivity. The sink was about 547 feet of Quaternary fill indicating subsidence and deposition. Diatomaceous beds exposed on the sink margin yielded samples dated by 14 C at 20,570 +- 540 years BP and greater than 32,000 years BP; these beds are believed stratigraphically equivalent to ditomaceous beds at 153 to 266 feet depth in the core. Aquatic fauna and flora from the upper 98 feet of core indicate a pluvial period (probably Tohokan) followed by an arid or very arid time before the present climate was established. Aquifer pump tests performed in the Quaternary sands and clays show transmissivities to be as high as 600 feet squared per day. As the water quality was good, the borehole was released to the lessee as a potential water well

  17. Basic data report for drillhole WIPP 15 (Waste Isolation Pilot Plant-WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    1981-11-01

    WIPP 15 is a borehole drilled in Marformation.h, 1978, in section 18, T.23S., R. 35E. of south-central Lea County. The purpose of WIPP 15 was to examine fill in San Simon Sink in order to extract climatic information and to attempt to date the collapse of the sink. The borehole was cored to total depth (810.5 feet) and encountered, from top to bottom, Quaternary calcareous clay, marl and sand, the claystones and siltstones of the Triassic Santa Rosa Formation. Neutron and gamma ray geophysical logs were run to measure density and radioactivity. The sink was about 547 feet of Quaternary fill indicating subsidence and deposition. Diatomaceous beds exposed on the sink margin yielded samples dated by /sup 14/C at 20,570 +- 540 years BP and greater than 32,000 years BP; these beds are believed stratigraphically equivalent to ditomaceous beds at 153 to 266 feet depth in the core. Aquatic fauna and flora from the upper 98 feet of core indicate a pluvial period (probably Tohokan) followed by an arid or very arid time before the present climate was established. Aquifer pump tests performed in the Quaternary sands and clays show transmissivities to be as high as 600 feet squared per day. As the water quality was good, the borehole was released to the lessee as a potential water well.

  18. Comparative evaluation of cerebral aneurysms with selective arterially enhanced CT and DSA

    International Nuclear Information System (INIS)

    Vanderschelden, P.; Flandroy, P.; Dondelinger, R.F.; Martin, D.; Lenelle, J.

    1998-01-01

    The purpose of our study was to compare selective arterially enhanced spiral computed tomographs (ACT) with digital subtraction angiographies (DSA) in the presurgical assessment of cerebral aneurysms. A total of 24 aneurysms in 18 patients were explored in a prospective study by ACT and DSA, using an interactive combined CT-angiography suite. Dimensions of the aneurysm, its relation to the parent vessel, and the aneurysmal index were defined on DSA and on surface-shaded display of 3D reformatted images obtained from ACT. Results were correlated with surgical findings. Three aneurysms suspected on DSA were not confirmed by ACT. One fusiform aneurysm suspected on DSA corresponded to a sacciform aneurysm on ACT. Surgical findings confirmed 20 sacciform aneurysms. The aneurysmal index could be measured in all 20 cases of sacciform aneurysms on ACT and could not be determined with confidence in 55 % of the cases on DSA. DSA and ACT gave identical results in 35 % of cases. In 10 %, the index measured by ACT was superior to that determined by DSA for aneurysms which had a diameter of less than 3 mm. In conclusion, the combination of DSA and ACT improved the results of DSA alone. ACT is a reliable method to measure the aneurysmal index in aneurysms with a diameter superior to 3 mm. (orig.)

  19. Brine inflow to WIPP disposal rooms: Data, modeling, and assessment

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, E.J.; McTigue, D.F.; Beraun, R.

    1988-09-01

    A WIPP data base that characterizes brine movement and accumulation is summarized and analyzed. The data are interrupted in terms of a model for flow in a saturated porous medium. The model, summarized in this report, embodies the Darcy-flow assumption and storage due to linearly elastic compression of the salt and brine. Comparisons between model calculations and brine inflow rates measured in the WIPP show order-of-magnitude agreement for permeabilities in the range of 10/sup/minus/21/ to 10/sup/minus/20/ m/sup 2/ (1-10 nanodarcies) 2/. These values of permeability are in accord with independent, in situ determinations of permeability in the salt. Expected accumulations of brine in typical WIPP waste disposal rooms were calculated by numerical methods using a mathematical description for the brine inflow model. The expected brine accumulation in a disposal room was calculated to be in the range of 4 m/sup 3/ to 43 m/sup 3/ in 100 years. WIPP disposal rooms, filled with waste and backfilled, are expected to be virtually completely reconsolidated due to host rock creep in about 100 years, preventing further accumulation of brine. Calculations show that water-absorbing tailored backfill materials can readily absorb the maximum expected brine accumulations in WIPP disposal rooms while maintaining adequate mechanical strength. 59 refs., 20 figs., 4 tabs.

  20. Concentration of uranium in the drinking and surface water around the WIPP site

    International Nuclear Information System (INIS)

    Khaing, H.; Lemons, B.G.; Thakur, P.

    2016-01-01

    Activity concentration of uranium isotopes ( 238 U, 234 U and 235 U) were analyzed in drinking and surface water samples collected in the vicinity of the WIPP site using alpha spectroscopy. The purpose of this study was to investigate the changes in uranium concentrations (if any) in the vicinity of the WIPP site and whether the February 14, 2014 radiation release event at the WIPP had any detectable impact on the water bodies around the WIPP. (author)

  1. Resource conservation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume IV contains the following attachments for Module IV: VOC monitoring plan for bin-room tests (Appendix D12); bin emission control and VOC monitoring system drawings; bin scale test room ventilation drawings; WIPP supplementary roof support system, underground storage area, room 1, panel 1, DOE/WIPP 91-057; and WIPP supplementary roof support system, room 1, panel 1, geotechnical field data analysis bi-annual report, DOE/WIPP 92-024

  2. WIPP - Pre-Licensing and Operations: Developer and Regulator Perspectives

    International Nuclear Information System (INIS)

    Peake, Tom; Patterson, R.

    2014-01-01

    The Waste Isolation Pilot Plant (WIPP) is a disposal system for defense-related transuranic (TRU) radioactive waste. Developed by the Department of Energy (DOE), WIPP is located in Southeastern New Mexico: radioactive waste is disposed of 2,150 feet underground in an ancient layer of salt with a total capacity of 6.2 million cubic feet of waste. Congress authorized the development and construction of WIPP in 1980 for the express purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States. This paper makes a historical review of the site development, site operations (waste disposal operations started in 1999), communications between US EPA and DOE, the chronology of pre-licensing and pre-operations, the operational phase and the regulatory challenges, and the lessons learned after 12 years of operations

  3. Efficient DSA-DP hybrid lithography conflict detection and guiding template assignment

    Science.gov (United States)

    Ou, Jiaojiao; Cline, Brian; Yeric, Greg; Pan, David Z.

    2017-03-01

    In recent years, directed self-assembly (DSA) has demonstrated tremendous potential to reduce cost for multiple patterning with fewer masks, especially for via patterning. DSA is considered as one of the next generation lithography candidates or complementary lithography techniques to extend 193i lithography further for the sub- 7 nm nodes. In this work, we focus on the simultaneous DSA guiding template assignment and decomposition with DSA and double patterning (DSA-DP) hybrid lithography for 7nm technology node. We first analyze the placement error of DSA patterns with different shapes and sizes. We then propose a graph-based approach to reduce the problem size and solve the problem more efficiently without affecting the optimality of the results. The experimental results demonstrate that we can achieve a 50% reduction in both the number of variables and constraints compared to previous work, which leads to a 50X speed up in runtime.

  4. Density driven placement of sub-DSA resolution assistant features (SDRAFs)

    Science.gov (United States)

    Guo, Daifeng; Tung, Maryann; Karageorgos, Ioannis; Wong, H.-S. Philip; Wong, Martin D. F.

    2017-03-01

    In the pursuit of alternatives to traditional optical lithography, block copolymer directed self-assembly (DSA) has emerged as a low-cost, high-throughput option. However, issues of defectivity have hampered DSA's viability for large-scale patterning. Recent studies have shown copolymer fill level to be a crucial factor in defectivity, as template overfill can result in malformed DSA structures and poor LCDU after etching. For this reason, it is previously demonstrated the use of sub-DSA resolution assist features (SDRAFs) as a method of evening out template density. In this work, we propose an algorithm to place SDRAFs in random logic contact/via layouts. By adopting this SDRAF placement scheme, we can significantly improve the density unevenness and the resources used are also optimized. This is the first work to investigate the placement of SDRAFs in order to mitigate the DSA density variation problem, and it can be adopted for the mass deployment of DSA.

  5. Application of DSA in interventional treatment of acute ischemic cerebrovascular disease

    International Nuclear Information System (INIS)

    Wang Jinlong; Ling Feng; Li Shenmao; Ji Xunming

    2008-01-01

    Objective: To study the utilization of DSA for interventional examination and therapy in acute ischemic cerebrovascular disease. Methods: The summarization of properly utilizing the DSA equipment and events happening in the process were analyzed after application on 550 cases with acute ischemic cerebrovascular attacks. Results: Application of perfusion DSA is useful to obtain rapid diagnosis and evaluation of interventional therapeutic efficacy for acute ischemic cerebrovascular disease. The practical projection angle can display the features and extent of vasculopathy clearly, and offer the best operative position for promotion of rotation DSA and the diagnostic imaging and therapeutic efficacy, three-dimensional reconstruction are useful to the success of interventional management. Imaging measuring technique of DSA would provide precise data for doctors to choose the accurate intervention materials. Conclusion: Reasonable utilization of DSA equipment plays an important role in interventional therapy of acute ischemic cerebrovascular disease, and also is the gold standard for displaying images for rapid diagnosis. (authors)

  6. The study of the value of applying the special functions of DSA during uterine artery embolization

    International Nuclear Information System (INIS)

    Wang Ting; Zhao Zhenhua; Lv Weigong

    2007-01-01

    Objective: To study the value of applying the special functions of DSA during uterine artery embolization. Methods: 122 cases were performed uterine artery embolization, including 67 cases with traditional operation and 55 cases with applying the special functions of DSA: rotary DSA angiography, the best work position and road map technology. We recorded the correlative operative indices to compare and analyse the mean exposure time, the mean operative time, the mean dosage of contrast medium, the probability of vasospasm and injury of blood vessel during operation. Results: The mean exposure time, mean operative time and the mean dosage of contrast medium were reduced with the special functions of DSA during uterine artery embolization. There is significant difference between traditional operation and the operation applying the special functions of DSA (P<0.01). Conclusion: Applying the special functions of DSA during uterine artery embolization can reduce the operative time, operative risk and economic burden. (authors)

  7. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  8. Status and Growth of Underground Science at WIPP

    Science.gov (United States)

    Rempe, Norbert T.

    2008-10-01

    The science community is increasingly taking advantage of research opportunities in the government-owned Waste Isolation Pilot Plant (WIPP), 655m underground near Carlsbad, NM. Discoveries so far include viable bacteria, cellulose, and DNA in 250 million-year old salt, preserved in an ultra-low background-radiation setting. Supplementing the overburden's shielding against cosmic radiation, terrestrial background from the host formation is less than five percent that of average crustal rock. In the past, WIPP accommodated development and testing of neutral current detectors for the Sudbury Neutrino Observatory and dark matter research, and it currently hosts two experiments pursuing neutrino-less double-beta decay. That scientists can listen to whispers from the universe in proximity to megacuries of radioactive waste lends, of course, credibility to the argument that WIPP itself is very safe. Almost a century of regional petroleum and potash extraction history and more than three decades of WIPP studies have generated a comprehensive body of knowledge on geology, mining technology, rock mechanics, geochemistry, and other disciplines relevant to underground science. Existing infrastructure is being used and can be expanded to fit experimental needs. WIPP's exemplary safety and regulatory compliance culture, low excavating and operating cost, and the high probability of the repository operating at least another 40 years make its available underground space attractive for future research and development. Recent proposals include low-photon energy counting to study internal dose received decades ago, investigations into ultra-low radiation dose response in cell cultures and laboratory animals (e.g., hormesis vs. linear no-threshold) and detectors for dark matter, solar and supernova neutrinos, and proton decay. Additional proposals compatible with WIPP's primary mission are welcome.

  9. Carbon dioxide DSA: An alternative to nonionic contrast material

    International Nuclear Information System (INIS)

    Hawkins, I.F.; Siragusa, R.; Mietling, S.; Storm, B.; Hawkins, M.; Hirko, R.; Colella, J.

    1987-01-01

    Over the past 6 years the authors have used CO/sub 2/ with DSA as a contrast agent in over 400 cases for arteriography, venography, portography, and opacification of the biliary and urinary tree. The compressibility of the CO/sub 2/ made consistent delivery difficult. Two injectors were designed which reliably delivered the exact amount of the inexpensive CO/sub 2/ which is required. This improved vascular opacification, collateral filling, and tumor AV shunting without any complications or discomfort. Selective renal artery injections were performed in over 20 patients with renal failure without any increase in creatinine. The authors' experience with animals, patients, and the new injectors are illustrated

  10. Directed self-assembly (DSA) grapho-epitaxy template generation with immersion lithography

    Science.gov (United States)

    Ma, Yuansheng; Lei, Junjiang; Torres, J. A.; Hong, Le; Word, James; Fenger, Germain; Tritchkov, Alexander; Lippincott, George; Gupta, Rachit; Lafferty, Neal; He, Yuan; Bekaert, Joost; Vanderberghe, Geert

    2015-03-01

    In this paper, we present an optimization methodology for the template designs of sub-resolution contacts using directed self-assembly (DSA) with grapho-epitaxy and immersion lithography. We demonstrate the flow using a 60nm-pitch contact design in doublet with Monte Carlo simulations for DSA. We introduce the notion of Template Error Enhancement Factor (TEEF) to gauge the sensitivity of DSA printing infidelity to template printing infidelity, and evaluate optimized template designs with TEEF metrics. Our data shows that SMO is critical to achieve sub-80nm non- L0 pitches for DSA patterns using 193i.

  11. Transbrachial selective carotid DSA in outpatients: safety and efficacy

    International Nuclear Information System (INIS)

    Rosen, T.; Poretti, F.; Vorwerk, D.; Krawczynski, H.

    2003-01-01

    Purpose: To describe safety and efficacy of transbrachial selective carotid digital subtraction angiography (DSA) in outpatients. Materials and Methods: From July 1999 to November 2001, selective carotid angiography was performed in 141 outpatients preferably using a left brachial arterial approach. The average age of the patients was 68 years (range: 39-89 years). After flush aortography through a 4F-pigtail catheter, bilateral selective common carotid artery (CCA) catheterization was performed with 4F-Sidewinder-1 or Sidewinder-2 catheters. In 49 patients, Doppler-sonography was performed before or after arteriography. A total of 41 patients underwent carotid surgery. Results: Selective catheterization of the CCA was successful in 96% of the cases. The diagnostic quality of the opacified aortra and CCA images was good to excellent. The overall complication rate did not exceed 2.1%, and severe complications were not observed. One patient showed transient neurological symptoms and another mild nausea and agitation, probably as toxic reaction to the contrast medium. A single local hematoma developed after unsuccessful puncture of the brachial artery. Conclusion: Transbrachial selective carotid DSA is safe, reliable and well-tolerated in outpatients and achieves a superimposition-free CCA visualization. (orig.) [de

  12. Evaluation of the proposed WIPP site in southeast New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Weart, W.D.

    1979-01-01

    Five years of earth science characterization of the proposed Waste Isolation Pilot Plant (WIPP) site provide a high level of assurance that the area is satisfactory for development of a geologic repository. Ecological investigations and socioeconomic studies have indicated only relatively benign impacts will occur from construction, operation and long-term aspects of the repository.

  13. Evaluation of the proposed WIPP site in southeast New Mexico

    International Nuclear Information System (INIS)

    Weart, W.D.

    1979-01-01

    Five years of earth science characterization of the proposed Waste Isolation Pilot Plant (WIPP) site provide a high level of assurance that the area is satisfactory for development of a geologic repository. Ecological investigations and socioeconomic studies have indicated only relatively benign impacts will occur from construction, operation and long-term aspects of the repository

  14. The Possible Critical Role of T-Cell Help in DSA-Mediated Graft Loss.

    Science.gov (United States)

    Süsal, Caner; Slavcev, Antonij; Pham, Lien; Zeier, Martin; Morath, Christian

    2018-02-06

    In the present review, we discuss a possible central role of T cell help in severe forms of graft damage mediated by donor-specific HLA antibodies (DSA). Some kidney transplant recipients with pretransplant DSA show a high graft failure rate, whereas in other patients DSA do not harm the transplanted kidney and in most cases disappear shortly after transplantation. Analyzing 80 desensitized highly immunized kidney transplant recipients and another multicenter cohort of 385 patients with pretransplant HLA antibodies, we reported recently that an ongoing T-cell help from an activated immune system, as measured by an increased level of soluble CD30 in serum, might be necessary for the DSA to exert a deleterious effect. Patients positive for both pretransplant DSA and sCD30 appear to require special measures, such as the elimination of DSA from the circulation, potent immunosuppression, good HLA matching and intense posttransplant monitoring, whereas exclusion of DSA-positive patients from transplantation in the absence of high sCD30 may not be justified in all cases, even if the pretransplant DSA are strong and complement activating. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  15. Introduction to the principles of Digital Subtraction Angiography (DSA)

    International Nuclear Information System (INIS)

    Kaplanis, P.

    1997-01-01

    Medical applications of advanced technology have rapidly become more sophisticated and more widespread. The field of diagnostic imaging is by no means an exception. There has been a number of breathtaking developments in the field of medical imaging in recent years. Today higher quality, greater clarity and more minute precision are considered not advantages but necessities. Hence new developments are concentrated in the data acquisition and image processing based on the microprocessor controlled modules interfaced with state of the art radiological imaging equipment. One such development is the subtraction of x-rays vis a computer for better visualization of blood vessels, cavities of the heart and of the coronary and pulmonary vascular system. This procedure is termed Digital Subtraction Angiography (DSA). (author)

  16. Automated tracking of the vascular tree on DSA images

    International Nuclear Information System (INIS)

    Alperin, N.; Hoffmann, K.R.; Doi, K.

    1990-01-01

    Determination of the vascular tree structure is important for reconstruction of three-dimensional vascular tree from biplane images, for assessment of the significance of a lesion, and for planning treatment for arteriovenous malformation. To automate these analyses, the authors of this paper are developing a method to determine the vascular tree structure from digital subtraction angiography (DSA) images. The authors have previously described a vessel tracking method, based on the double-square-box technique. To improve the tracking accuracy, they have developed and integrated with the previous method a connectivity test and guided-sector-search technique. The connectivity test, based on region growing techniques, eliminates tracking across nonvessel regions. The guided sector-search method incorporates information from a larger are of the image to guide the search for the next tracking point

  17. Chronic thromboembolic pulmonary hypertension: diagnostic impact of multislice-CT and selective pulmonary-DSA

    International Nuclear Information System (INIS)

    Pitton, M.B.; Kemmerich, G.; Herber, S.; Schweden, F.; Thelen, M.; Mayer, E.

    2002-01-01

    Purpose: To evaluate the diagnostic impact of multislice-CT and selective pulmonary DSA in chronic thromboembolic pulmonary hypertension (CTEPH). Methods: 994 vessel segments of 14 consecutive patients with CTEPH were investigated with multislice-CT (slice thickness 3 mm, collimation 2.5 mm, reconstruction intervall 2 mm) and selective pulmonary DSA posterior-anterior, 45 oblique, and lateral projection. Analysis was performed by 2 investigators independently for CT and DSA. Diagnostic criteria were occlusions and non-occlusive changes like webs and bands, irregularities of the vessel wall, diameter reduction and thromboembolic depositions at different levels from central pulmonary arteries to subsegmental arteries. Reference diagnosis was made by synopsis of CT and DSA by consensus. Results: Concerning patency CT and DSA showed concordant findings overall in 88.9%, 92.9% for segmental arteries and 85.4% for subsegmental arteries. Concerning any thromboembolic changes, multislice-CT was significantly inferior to selective DSA (concordance 67.0% overall, 70.4% for segments and 63.6% for subsegments). Non-occlusive changes of the vessels were significantly underdiagnosed by CT (concordance of CT versus DSA: 23.1%). Conclusion: Multislice-CT and selective pulmonary DSA are equivalent for diagnosis of vessel occlusions at the level of segmental and subsegmental arteries. However, for visualisation of the non-occlusive thromboembolic changes of the vessel wall selective pulmonary DSA is still superior compared to multislice-CT. Multislice-CT and selective pulmonary DSA are complementary tools for diagnosis and treatment planning of chronic thromboembolic pulmonary hypertension (CTEPH). (orig.) [de

  18. Comparative study of Waste Isolation Pilot Plant (WIPP) transportation alternatives

    International Nuclear Information System (INIS)

    1994-02-01

    WIPP transportation studies in the Final Supplement Environmental Impact Statement for WIPP are the baseline for this report. In an attempt to present the most current analysis, this study incorporates the most relevant data available. The following three transportation options are evaluated for the Disposal Phase, which is assumed to be 20 years: Truck shipments, consisting of a tractor and trailer, with three TRUPACT-IIs or one RH-72B; Regular commercial train shipments consisting of up to three railcars carrying up to 18 TRUPACT-IIs or up to six RH-72Bs; Dedicated train shipments consisting of a locomotive, an idle car, railcars carrying 18 TRUPACT-IIs or six RH-72Bs, another idle car, and a caboose or passenger car with an emergency response specialist. No other cargo is carried. This report includes: A consideration of occupational and public risks and exposures, and other environmental impacts; A consideration of emergency response capabilities; and An extimation of comparative costs

  19. Constitutive representation of damage development and healing in WIPP salt

    International Nuclear Information System (INIS)

    Chan, K.S.; Bodner, S.R.; Fossum, A.F.; Munson, D.E.

    1994-01-01

    There has been considerable interest in characterizing and modeling the constitutive behavior of rock salt with particular reference to long-term creep and creep failure. The interest is motivated by the projected use of excavated rooms in salt rock formations as repositories for nuclear waste. It is presumed that closure of those rooms by creep ultimately would encapsulate the waste material, resulting in its effective isolation. A continuum mechanics approach for treating damage healing is formulated as part of a constitutive model for describing coupled creep, fracture, and healing in rock salt. Formulation of the healing term is, described and the constitutive model is evaluated against experimental data of rock salt from the Waste Isolation Pilot Plant (WIPP) site. The results indicate that healing anistropy in WIPP salt can be modeled with an appropriate power-conjugate equivalent stress, kinetic equation, and evolution equation for damage healing

  20. Waste characterization program plan for WIPP experimental waste

    International Nuclear Information System (INIS)

    1991-01-01

    This program plan is being issued by the Department of Energy (DOE) to reflect the current status of the waste characterization program. Not all methods of compliance with the requirements imposed by the regulators have been fully developed. Although the Environmental Protection Agency has issued the Conditional No-Migration Determination for the Waste Isolation Pilot Plant (WIPP), several activities have to be studied for recommendations of optimum courses of action. Therefore, as the DOE determines compliance methodologies for the requirements of the No-Migration Determination and for the requirements of the New Mexico Environmental Improvement Division, this program plan will be revised and reissued as often as necessary. It should also be understood that the DOE will comply with all regulations prior to making any shipment of transuranic waste to the WIPP for the experiments. 14 refs., 4 figs., 5 tabs

  1. Comparative study of Waste Isolation Pilot Plant (WIPP) transportation alternatives

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    WIPP transportation studies in the Final Supplement Environmental Impact Statement for WIPP are the baseline for this report. In an attempt to present the most current analysis, this study incorporates the most relevant data available. The following three transportation options are evaluated for the Disposal Phase, which is assumed to be 20 years: Truck shipments, consisting of a tractor and trailer, with three TRUPACT-IIs or one RH-72B; Regular commercial train shipments consisting of up to three railcars carrying up to 18 TRUPACT-IIs or up to six RH-72Bs; Dedicated train shipments consisting of a locomotive, an idle car, railcars carrying 18 TRUPACT-IIs or six RH-72Bs, another idle car, and a caboose or passenger car with an emergency response specialist. No other cargo is carried. This report includes: A consideration of occupational and public risks and exposures, and other environmental impacts; A consideration of emergency response capabilities; and An extimation of comparative costs.

  2. New Mexico Environmental Evaluation Group - experience in reviewing WIPP

    International Nuclear Information System (INIS)

    Neill, R.H.

    1983-01-01

    The purpose of the New Mexico Environmental Evaluation Group is to conduct an independent evaluation of the potential radiation exposure to people from WIPP--a radioactive waste facility intended to permanently dispose transuranic radioactive waste generated from the nation's nuclear weapons program. The concept of a State review of a proposed radioactive waste facility has been endorsed by both Federal and State legislative and executive agencies, and the experiences and interactions of the past four years to solve problems of this first-of-a-kind radioactive waste facility has led to many innovations in conflict resolution. The multidisciplinary Group's position is neither pro nor anti-WIPP and results are published and given broad dissemination to insure technical and public scrutiny of its work

  3. Weatherization Innovation Pilot Program (WIPP): Technical Assistance Summary

    Energy Technology Data Exchange (ETDEWEB)

    Hollander, A.

    2014-09-01

    The U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Programs Office (WIPO) launched the Weatherization Innovation Pilot Program (WIPP) to accelerate innovations in whole-house weatherization and advance DOE's goal of increasing the energy efficiency and health and safety of low-income residences without the utilization of additional taxpayer funding. Sixteen WIPP grantees were awarded a total of $30 million in Weatherization Assistance Program (WAP) funds in September 2010. These projects focused on: including nontraditional partners in weatherization service delivery; leveraging significant non-federal funding; and improving the effectiveness of low-income weatherization through the use of new materials, technologies, behavior-change models, and processes.

  4. Technical basis for external dosimetry at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Bradley, E.W.; Wu, C.F.; Goff, T.E.

    1993-01-01

    The WIPP External Dosimetry Program, administered by Westinghouse Electric Corporation, Waste Isolation Division, for the US Department of Energy (DOE), provides external dosimetry support services for operations at the Waste Isolation Pilot Plant (WIPP) Site. These operations include the receipt, experimentation with, storage, and disposal of transuranic (TRU) wastes. This document describes the technical basis for the WIPP External Radiation Dosimetry Program. The purposes of this document are to: (1) provide assurance that the WIPP External Radiation Dosimetry Program is in compliance with all regulatory requirements, (2) provide assurance that the WIPP External Radiation Dosimetry Program is derived from a sound technical base, (3) serve as a technical reference for radiation protection personnel, and (4) aid in identifying and planning for future needs. The external radiation exposure fields are those that are documented in the WIPP Final Safety Analysis Report

  5. Value of infusion-DSA (Digital Subtraction Angiography) in diagnosis of primary hepatocellular carcinoma

    International Nuclear Information System (INIS)

    Kwon, Jeong Mi; Kim, So Sun; Huh, Jin Do; Kim, Ho Joon; Chun, Byung Hee; Joh, Young Duk

    1991-01-01

    In order to evaluate diagnostic effectiveness of the infusion-study, the authors prospectively evaluated hepatic digital subtraction angiography of bolus and infusion studies in 71 patients with hepatocellular carcinoma. In contrast to Bolus-DSA, which involves a 2 second injection of 10cc of contrast medium, the Infusion-DSA uses a protracted (10sec) injection, a lower injection rate, and larger total dose of contrast medium (20cc). The information yield of arterial and capillary phases of Infusion-DSA was compared with that of Bolus-DSA and graded as 'improved(+)', 'equivalent( ± )', or 'poor(-)'. Also, the contribution of Infusion-DSA to the diagnosis was classified into one of five in a graded system. In 29 hepatocellular patients, the Infusion-DSA was helpful in detecting daughter nodules, fibrous capsule and arteriovenous shunt. Infusion-DSA is a useful complementary technique in the diagnosis of hepatocellular carcinoma and was also helpful in determining the selection of the therapeutic modality of hepatocellular carcinoma

  6. Preoperative imaging in 78 living kidney donors using CE-MRA and DSA

    International Nuclear Information System (INIS)

    Lemke, U.; Taupitz, M.; Hamm, B.; Kroencke, T.J.; Kluener, C.; Giessing, M.; Schoenberger, B.

    2008-01-01

    Purpose: to evaluate contrast-enhanced 3D magnetic resonance angiography (CE-MRA) and digital subtraction angiography (DSA) in comparison with the intraoperative findings in living kidney donors. Materials and methods: a total of 156 kidneys in 78 potential kidney donors were prospectively examined using CE-MRA (0.2 mmol Gd/kg, voxel size 1.3 x 0.8 x 2.0) and DSA. Two experienced radiologists assessed the images in consensus regarding the renal vascular anatomy and variants. The results for the 67 candidates accepted for donation were compared to the intraoperative findings. In the other kidneys not accepted for donor nephrectomy, MRA and DSA were compared with each other. Results: nineteen arterial variants were identified intraoperatively, of which 11 (58%) were also detected by preoperative CE-MRA and 10 (53%) by preoperative DSA. Of the 10 venous variants found intraoperatively, CE-MRA detected 8 (80%) and DSA 3 (30%). The agreement (kappa test) between MRI and DSA for all 156 evaluated kidneys was 0.7 for arterial variants (McNemar p = 0.12) and 0.3 for venous variants (McNemar p = 0.01). The preoperative choice of kidney (right or left) made on the basis of the renal vascular anatomy seen on CE-MRA and DSA differed in 22% of the 78 potential donors (McNemar P = 0.3). (orig.)

  7. The availability of DSA used continuous intraarterial infusion tubes founded various malignancy

    International Nuclear Information System (INIS)

    Minakuchi, Kazuo; Kobayashi, Nobuyuki; Yamada, Tetsuya

    1987-01-01

    DSA was employed using continuous intraarterial infusion tubes for various malignancies (73 cases) which were examined a total of 135 times. In head and neck malignancy (50 cases), the general position of the infusion tube had been determined beforehand by dye infusion, but DSA from the tube showed that the tubes in 24 cases (48 %) were located in the wrong position, especially in tongue cancer (21 cases) where many tubes were discovered to be in an erroreous position (71 %) such as the common carotid artery. We were unable to determine the effect of chemotherapy and radiation using DSA only. In 9 cases of breast cancer for which fixation of the tube was not attempted under X-ray fluoroscopy, 7 (78 %) showed an unusual tube position such as the intraaortic arch. In 5 cases of abdominal malignancy, only the tube position for sigmoid colon cancer was unusual. We were able to observe the effect of chemotherapy by DSA in 2 cases. For DSA in one out of 3 hepatomas using a Port-A-Cath, we observed that infusion of anticancer drug with degradable starch microspheres caused a reduction in tumor size. However, in the two remaining cases, we were unable to observe any effect of infusion of these drugs by DSA for various mechanical reasons. DSA from an infusion tube revealed not only the location of the tube accurately and promptly, but also the effect of chemotherapy. (author)

  8. HVAC fault tree analysis for WIPP integrated risk assessment

    International Nuclear Information System (INIS)

    Kirby, P.; Iacovino, J.

    1990-01-01

    In order to evaluate the public health risk from operation of the Waste Isolation Pilot Plant (WIPP) due to potential radioactive releases, a probabilistic risk assessment of waste handling operations was conducted. One major aspect of this risk assessment involved fault tree analysis of the plant heating, ventilation, and air conditioning (HVAC) systems, which comprise the final barrier between waste handling operations and the environment. 1 refs., 1 tab

  9. Test plan: Potash Core Test. WIPP experimental program borehole plugging

    International Nuclear Information System (INIS)

    Christensen, C.L.

    1979-09-01

    The Potash Core Test will utilize a WIPP emplaced plug to obtain samples of an in-situ cured plug of known mix constituents for bench scale testing. An earlier effort involved recovery at the salt horizon of Plug 217, a 17 year old plug in a potash exploration hole for bond testing, but the lack of particulars in the emplacement precluded significant determination of plug performance

  10. Identification of issues relevant to the first recertification of WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Lawrence E. [Environmental Evaluation Group, Albuquerque, NM (United States); Silva, Matthew K. [Environmental Evaluation Group, Albuquerque, NM (United States); Channell, James K. [Environmental Evaluation Group, Albuquerque, NM (United States)

    2002-09-30

    One goal of the WIPP Land Withdrawal Act was to assure the safe disposal of the nation’s defense transuranic waste into a deep repository in southeast New Mexico. The governing legislation required the U.S. Department of Energy (DOE) to provide to the U.S. Environmental Protection Agency (EPA) analyses of the anticipated performance of the repository. Disposal operations could not begin until the EPA determined that the project demonstrated compliance with EPA Standards (40 CFR 191) and EPA Criteria (40 CFR 194) for such disposal. The Land Withdrawal Act inherently recognized that the EPA Certification would have to rely on best available knowledge at the time when the application was submitted. The Act also recognized that after the initial certification of WIPP and start of disposal operations, operating experience and ongoing research would result in new technical and scientific information. Thus, the legislation requires recertification of the WIPP every five years, following the first receipt of waste. This report updates issues that the Environmental Evaluation Group (EEG) considers important as the Department of Energy (DOE) works towards the first recertification. These issues encompass a variety of technical areas including actinide solubility, fluid injection scenarios, solution mining, Culebra flow and transport, spallings modeling, and non-random waste emplacement. Given the 24,000-year half life of 239Pu, understanding the characteristics of plutonium in the WIPP environment is obviously important to the validity of long-term performance assessment of the repository. Some uncertainty remains in the understanding of the persistence of higher oxidation states because of reliance on modeling (with its associated assumptions) and limited experimental results. The EEG recommends additional experimental work towards parameters for a proposed conceptual kinetic model of plutonium solubility. In addition, the EEG recommends an intrusion scenario

  11. Dsa examination and diagnosis of arteriovenous shunts in hepatic cavernous hemangiomas of adults

    International Nuclear Information System (INIS)

    Ouyang Yong; Ouyang Xuehui; Gu Subin; Zhou Qunhui

    2000-01-01

    Objective: To correct the misunderstanding that arteriovenous shunts (AVS) are rarely found in adult cavernous hemangiomas of the liver (CHL) and to increase its diagnosis rate by DSA. Methods: DSA examination and DSA images of thirty adults with definitely diagnostic CHL and without evidence of other hepatic diseases and hepatic injury were analyzed retrospectively. X-ray films of 21 cases with AVS taken immediately after transcatheter arterial embolization using lipiodol (L-TAE) were compared with the corresponding DSA images to check up those AVS opacified in DSA by observing sediment and distribution of iodized oil injected. Results: Definite diagnosis of AVS by DSA were obtained in 22 cases of this series (73%). All the AVS were located in the peritumoral parenchyma and appeared as parallel track sign, and early opacification of small draining veins, etc. during arterial phase of DSA. X-ray films taken immediately after L-TAE in 21 of 22 cases with AVS showed that few portal radicles or draining veins were refilled by iodized oil through incompletely occluded shunts in 11 cases, and no any vein was refilled by iodized oil resulted from complete occlusion of the present AVS in 10. No definite AVS was found in the other 8 cases of this series, and in 6 of them improper imaging factors of DSA were used. Conclusion: This study serves to emphasize that AVS is not a diagnosis of hepatic malignancy, but is frequently seen in the commonly benign CHL of adults. Proper imaging factors of DSA and superior images can be helpful to opacify small AVS of CHL. The formation of AVS in CHL may be closely related to the pathological changes of peritumoral parenchyma, however, its mechanism must be further studied

  12. WIPP: a perspective from ten years of operating success - 16189

    International Nuclear Information System (INIS)

    Gregory, Phillip C.

    2009-01-01

    The Waste Isolation Pilot Plant (WIPP), located 35 miles east of Carlsbad, New Mexico, USA is the first and, to the author's knowledge, only facility in the world for the permanent disposal of defense related transuranic (TRU) waste. Soon after plutonium was first synthesized in 1940 by a team of scientists at the University of California Berkeley Laboratory, the need to find a permanent repository for plutonium contaminated waste was recognized due to the more than 24,000 year half-life of Plutonium-239 ( 239 Pu). In 1957 the National Academy of Sciences published a report recommending deep geological burial in bedded salt as a possible solution. However, more than 50 years passed before the solution was achieved when in 1999 WIPP received the first shipment of TRU waste from Los Alamos National Laboratory. Ten years later, more than 7,600 shipments of TRU waste have been disposed of in rooms mined in an ancient salt bed more than 2,000 feet underground. This paper provides a brief history of WIPP with an overview of the technical, regulatory, and political hurdles that had to be overcome before the idea of a permanent disposal facility became reality. The paper focuses primarily on the safe, uneventful transportation program that has moved 100,000- plus containers of TRU waste from various U.S. Department of Energy (DOE) generator and/or storage sites across the Unites States to southeastern New Mexico. (author)

  13. The WIPP transportation system -- ''Safer than any other''

    International Nuclear Information System (INIS)

    Ward, T.R.; Spooner, R.

    1991-01-01

    The Department of Energy (DOE) has developed an integrated transportation system to transport transuranic (TRU) waste from ten widely dispersed generator sites to the Waste Isolation Pilot Plant (WIPP). The system consists of a Type B container, a specially designed trailer, a lightweight tractor, the DOE TRANSCOM satellite-based vehicle tracking system, and uniquely qualified and highly trained drivers. The DOE has demonstrated that this system is ready to transport the TRU waste to the WIPP site efficiently and safely. Since the system was put in place in November 1988, it has been repeatedly upgraded and enhanced to incorporate additional safety measures. In June of 1989, the National Academy of Sciences (NAS) reviewed the transportation system and concluded that ''the system proposed for transportation of TRU waste to WIPP is safer than that employed for any other hazardous material in the United States today and will reduce risk to very low levels'' (emphasis added). The NAS conclusion was made before the DOE implemented the Enhanced Driver Training Course for carrier drivers. The challenge facing the DOE was to examine the transportation system objectively and determine what additional improvements could be made to further enhance safety

  14. WIPP gets thumbs up; Ward Valley time runs out

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Legislation passed in late September clears the way for the Department of Energy to begin shipment of national defense transuranic (TRU) radioactive waste to the Waste Isolation Pilot Plant (WIPP), near Carlsbad, NM, as early as November 1997. On September 23, President Clinton signed the Fiscal Year 1997 Defense Authorization Bill, which contained amendments to the 1992 WIPP Land Withdrawal Act. The implementation of the law will help the DOE in its cleanup sites nationwide, and will enhance public health and safety by providing for the disposal of the waste in a 2150-ft underground salt formation, far away from population centers. Key components of the legislation include the following: (1) The US Environmental Protection Agency (EPA) will continue as primary regulator of WIPP. (2) The EPA will have one year to review the Compliance Certification Application, which the DOE was to submit by October 31, 1996. Upon EPA certification (expected in October 1997), the DOE will begin shipping transuranic waste in November 1997. (3) A six-month waiting period for waste shipments has been removed (previously, the DOE was required to wait 180 days after the Energy Secretary's decision to begin disposal operations). (4) New Mexico will receive $20 million immediately, and annually for 14 years, with the funds to be used for infrastructure and road improvements in the state

  15. A coupled mechanical/hydrologic model for WIPP shaft seals

    International Nuclear Information System (INIS)

    Ehgartner, B.

    1991-06-01

    Effective sealing of the Waste Isolation Pilot Plant (WIPP) shafts will be required to isolate defense-generated transuranic wastes from the accessible environment. Shafts penetrate water-bearing hard rock formations before entering a massive creeping-salt formation (Salado) where the WIPP is located. Short and long-term seals are planned for the shafts. Short-term seals, a composite of concrete and bentonite, will primarily be located in the hard rock formations separating the water-bearing zones from the Salado Formation. These seals will limit water flow to the underlying long-term seals in the Salado. The long-term seals will consist of lengthly segments of initially unsaturated crushed salt. Creep closure of the shaft will consolidate unsaturated crushed salt, thereby reducing its permeability. However, water passing through the upper short-term seals and brine inherent to the salt host rock itself will eventually saturate the crushed salt and consolidation could be inhibited. Before saturating, portions of the crushed salt in the shafts are expected to consolidate to a permeability equivalent to the salt host rock, thereby effectively isolating the waste from the overlying water-bearing formations. A phenomenological model is developed for the coupled mechanical/hydrologic behavior of sealed WIPP shafts. The model couples creep closure of the shaft, crushed salt consolidation, and the associated reduction in permeability with Darcy's law for saturated fluid flow to predict the overall permeability of the shaft seal system with time. 17 refs., 6 figs., 1 tab

  16. Actinide Solubility and Speciation in the WIPP [PowerPoint

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Donald T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-02

    The presentation begins with the role and need for nuclear repositories (overall concept, international updates (Sweden, Finland, France, China), US approach and current status), then moves on to the WIPP TRU repository concept (design, current status--safety incidents of February 5 and 14, 2014, path forward), and finally considers the WIPP safety case: dissolved actinide concentrations (overall approach, oxidation state distribution and redox control, solubility of actinides, colloidal contribution and microbial effects). The following conclusions are set forth: (1) International programs are moving forward, but at a very slow and somewhat sporadic pace. (2) In the United States, the Salt repository concept, from the perspective of the long-term safety case, remains a viable option for nuclear waste management despite the current operational issues/concerns. (3) Current model/PA prediction (WIPP example) are built on redundant conservatisms. These conservatisms are being addressed in the ongoing and future research to fill existing data gaps--redox control of plutonium by Fe(0, II), thorium (analog) solubility studies in simulated brine, contribution of intrinsic and biocolloids to the mobile concentration, and clarification of microbial ecology and effects.

  17. WIPP Compliance Certification Application calculations parameters. Part 2: Parameter documentation

    International Nuclear Information System (INIS)

    Howarth, S.M.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed, which provided in depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. Nearly 1,500 parameters were developed using information gathered from this program and were input to numerical models for WIPP Compliance Certification Application (CCA) Performance Assessment (PA) calculations. The CCA probability models require input parameters that are defined by a statistical distribution. Developing parameters begins with the assignment of an appropriate distribution type, which is dependent on the type, magnitude, and volume of data or information available. Parameter development may require interpretation or statistical analysis of raw data, combining raw data with literature values, scaling laboratory or field data to fit code grid mesh sizes, or other transformations. Documentation of parameter development is designed to answer two questions: What source information was used to develop this parameter? and Why was this particular data set/information used? Therefore, complete documentation requires integrating information from code sponsors, parameter task leaders, performance assessment analysts, and experimental principal investigators. This paper, Part 2 of 2 parts, contains a discussion of the WIPP CCA PA Parameter Tracking System, document traceability and retrievability, and lessons learned from related audits and reviews

  18. Advantages and limitation of intra-arterial digital subtraction angiography (i.a. DSA)

    International Nuclear Information System (INIS)

    Beduhn, D.

    1986-01-01

    Among 3000 digital subtraction angiographies which have been performed in our institute, 850 patients have been examined intraarterially. The advantage of i.a. DSA is due to the excellent demonstration of vessels in survey angiograms by small amounts of contrast medium (10-20 ml in the aorta), without risk of selective catheterisation into the neck vessels, the saving of expensive film series, the short duration of vessel examinations and the small complication rate. i.a. DSA can be carried out on outpatients also, using the 4/5 F-catheter, which saves hospital charges. Impressive examples show the advantages of i.a. DSA. (orig.) [de

  19. CH-TRU Waste Content Codes (CH-TRUCON)

    International Nuclear Information System (INIS)

    2004-01-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes 'shipping categories' that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the 'General Case,' which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for 'Close-Proximity Shipments' (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for 'Controlled Shipments

  20. CH-TRU Waste Content Codes (CH-TRUCON)

    International Nuclear Information System (INIS)

    2008-01-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes 'shipping categories' that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the 'General Case,' which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for 'Close-Proximity Shipments' (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for 'Controlled Shipments

  1. CH-TRU Waste Content Codes (CH-TRUCON)

    International Nuclear Information System (INIS)

    2005-01-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes 'shipping categories' that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the 'General Case,' which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for 'Close-Proximity Shipments' (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for 'Controlled Shipments

  2. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-08-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  3. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-05-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  4. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-03-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  5. CH-TRU Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-10-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  6. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-01-30

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  7. CH-TRU Waste Content Codes (CH TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2004-12-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  8. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-06-20

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  9. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-11-20

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  10. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-12-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  11. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2004-10-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  12. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2005-01-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codesand corresponding shipping categories for "Controlled Shipments

  13. CH-TRU Waste Content Codes (CH-TRUCON)

    International Nuclear Information System (INIS)

    2006-01-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes 'shipping categories' that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the 'General Case,' which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for 'Close-Proximity Shipments' (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for 'Controlled Shipments

  14. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-12-20

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  15. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-08-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  16. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2007-06-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  17. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2007-08-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  18. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-09-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  19. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2007-02-15

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  20. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-06-20

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  1. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-01-18

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  2. CH-TRU Waste Content Codes (CH-TRUCON)

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2007-09-20

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  3. CH-TRU Waste Content Codes (CH-TRUCON)

    International Nuclear Information System (INIS)

    2007-01-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes 'shipping categories' that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the 'General Case,' which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for 'Close-Proximity Shipments' (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for 'Controlled Shipments

  4. CH-TRU Content Codes (CH-TRUCON)

    International Nuclear Information System (INIS)

    2005-01-01

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes 'shipping categories' that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the 'General Case,' which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for 'Close-Proximity Shipments' (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for 'Controlled Shipments

  5. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  6. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  7. Leveraging Radioactive Waste Disposal at WIPP for Science

    Science.gov (United States)

    Rempe, N. T.

    2008-12-01

    Salt mines are radiologically much quieter than other underground environments because of ultra-low concentrations of natural radionuclides (U, Th, and K) in the host rock; therefore, the Waste Isolation Pilot Plant (WIPP), a government-owned, 655m deep geologic repository that disposes of radioactive waste in thick salt near Carlsbad, New Mexico, has for the last 15 years hosted highly radiation-sensitive experiments. Incidentally, Nature started her own low background experiment 250ma ago, preserving viable bacteria, cellulose, and DNA in WIPP salt. The Department of Energy continues to make areas of the WIPP underground available for experiments, freely offering its infrastructure and access to this unique environment. Even before WIPP started disposing of waste in 1999, the Room-Q alcove (25m x 10m x 4m) housed a succession of small experiments. They included development and calibration of neutral-current detectors by Los Alamos National Laboratory (LANL) for the Sudbury Neutrino Observatory, a proof-of-concept by Ohio State University of a flavor-sensitive neutrino detector for supernovae, and research by LANL on small solid- state dark matter detectors. Two currently active experiments support the search for neutrino-less double beta decay as a tool to better define the nature and mass of the neutrino. That these delicate experiments are conducted in close vicinity to, but not at all affected by, megacuries of radioactive waste reinforces the safety argument for the repository. Since 2003, the Majorana collaboration is developing and testing various detector designs inside a custom- built clean room in the Room-Q alcove. Already low natural background readings are reduced further by segmenting the germanium detectors, which spatially and temporally discriminates background radiation. The collaboration also demonstrated safe copper electro-forming underground, which minimizes cosmogenic background in detector assemblies. The largest currently used experimental

  8. Survey of DSA-certified digital repositories : Report on the findings in a survey of all DSA-certified digital repositories on investments in and benefits of acquiring the Data Seal of Approval (DSA)

    NARCIS (Netherlands)

    Waterman, Kees-Jan; Sierman, Barbara

    2016-01-01

    The Data Seal of Approval (DSA) has been in use as a certification instrument for trustworthy digital repositories (TDRs) since 2010. By March 2016 some 50 repositories had applied successfully for the seal. Whereas some organizations and repositories have published about their own experiences in

  9. The protection of radioactive nuclide and nursing management in DSA room

    International Nuclear Information System (INIS)

    Zhang Guimin

    2009-01-01

    Objective: To discuss the protection of radioactive nuclide and nursing management in DSA room. Methods: The clinical state of the protection of radioactive 131 I nuclide and nursing management in DSA room was retrospectively summarized. Results: The standard management for the protection of radioactive nuclide in DSA room was established. The main management schemas included the management of personnel, the management of professional skills and, specialty, the management of radioactive drugs and abandoned odds and ends, preoperative health education, etc. Conclusion: The standard management can ensure that the patients get a good radionuclide therapy in DSA room, and, at the same time, the working environment can be effectively protected and the professional nursing staff can be well trained. (authors)

  10. Adjusting the displaced tip of peripherally inserted central catheter under DSA guidance

    International Nuclear Information System (INIS)

    Mao Yanjun; Dong Huijuan; Zhang Lingjuan; Li Hongmei; Xu Lianqin

    2009-01-01

    Objective: To explore a new method to adjust the displaced tip of peripherally inserted central catheter (PICC) under DSA guidance. Methods: Under DSA guidance, the displaced tip of PICC was repositioned to the ideal junction area of superior vena cava with right atrium with proper manipulation. Results: Under DSA guidance, the displaced tip of PICC was successfully corrected in 13 cases. The mean operative time was 15.53 minutes, which was markedly shorter than that needed by blind adjusting beside the bed. Conclusion: The displacement of PICC tip is a common occurrence, which is hard to be avoided. Under DSA guidance, the adjusting manipulation of the displaced PICC tip is safe and time-saving with high successful rate. It is worth popularizing this technique in clinical practice. (authors)

  11. Origin of the brines near WIPP from the drill holes ERDA-6 and WIPP-12 based on stable isotope concentrations of hydrogen and oxygen

    International Nuclear Information System (INIS)

    Spiegler, P.; Updegraff, D.

    1983-03-01

    Pathways which might alter the isotopic compositions of deuterium and oxygen-18 meteoric water, seawaters, and in hydration waters in gypsum to the isotopic compositions of brines encountered at ERDA-6 and WIPP-12 are discussed. Present geologic conditions do not favor the alteration of the isotopic compositions of waters that exist near the WIPP site to those of the brines by these pathways. It is concluded that the brines encountered at ERDA-6 and WIPP-12 are probably derived from ancient ocean waters that have been isotopically enriched in oxygen-18 by exchange interaction with rock. The dehydration of gypsum as a process of origin of these brines cannot be ruled out

  12. Internal carotid artery stenosis or occlusion: study of collateral circulation pathways on DSA and MRA

    International Nuclear Information System (INIS)

    Zhao Yunhui; Ma Zhubin; Xu Yikai

    2004-01-01

    Objectives: To evaluate the collateral pathways of internal carotid artery (ICA) stenosis or occlusion on digital subtraction angiography (DSA) and magnetic resonance angiography (MRA), and to compare these two methods in the study for collateral pathways. Methods: Seventy-four patients with ICA stenosis or occlusion were included as the study group. Sixty persons with normal findings on DSA or MRA each served as the control group. DSA, MRA, MRI, CT findings, and clinicall materials were analyzed in the two groups. Results: Stenosis or occlusion over ICA bifurcation was showed clearly in all patients on DSA or MRA. On DSA, the presence rate of ipsilateral posterior communicating artery (PCoA) in the study group (82.5%) was lower significantly than that of the control group (94.2%) (P=0.025). On MRA (3D-TOF), the rate in the study group (59.3%) was higher significantly than that of the controls (30.0%) (P=0.000). On DSA and MRA, the diameter of ipsilateral PCoA in the study group was larger than that of the control group (P=0.000). On DSA, the presence rate of OPhA in the study group was significantly different from that of the control group, and its diameter was larger than that of the control group (P=0.003). On MRA, its presence rate was lower than that of the control group. The presence rate of anterior communicating artery (ACoA) in the study group showed no statistical difference between DSA and MRA. In the study group, the presence rate of PCoA on DSA was significantly higher than that on MRA (P 0.05). The diameters of the three arteries showed no significant differences between DSA and MRA (P>0.05). Conclusion: DSA is highly valuable for the evaluation of collateral pathways of ICA stenosis or occlusion, and it is necessary for preoperative examination. MRA is a non-invasive angiographic method and can evaluate collateral circulation in both morphology and function, and can be the preferred method for the disease. (authors)

  13. [2011 Shanghai customer satisfaction report of DSA/X-ray equipment's after-service].

    Science.gov (United States)

    Li, Bin; Qian, Jianguo; Cao, Shaoping; Zheng, Yunxin; Xu, Zitian; Wang, Lijun

    2012-11-01

    To improve the manufacturer's medical equipment after-sale service, the fifth Shanghai zone customer satisfaction survey was launched by the end of 2011. The DSA/X-ray equipment was setup as an independent category for the first time. From the survey we can show that the DSA/X-ray equipment's CSI is higher than last year, the customer satisfaction scores of preventive maintenance and service contract are lower than others, and CSI of local brand is lower than imported brand.

  14. Comparison of application value of DSA and MRA in diagnosis of subacute spontaneous intracerebral hemorrhage

    International Nuclear Information System (INIS)

    Zhou Mingli; Qu Tianrong; Feng Jun

    2012-01-01

    Objective: To explore the clinical value of digital subtraction angiography (DSA) and magnetic resonance angiography (MRA) in diagnosis of cerebral vascular structural abnormalities in the patients with spontaneous cerebral hemorrhage in subacute phase, and to provide clinical basis for detection of cerebral vascular structural abnormalities. Methods: 183 patients with subacute spontaneous intracerebral hemorrhage within 1 week were selected, the vascular structures of the patients were detected by DSA and MRA, and the influence factors were analyzed. Results: The DSA and MRA results showed that the parietal lobe, frontal lobe, and lenticular nucleus had the largest incidence rates of spontaneous intracerebral hemorrhage, and accounted for 17.5% , 16.9% , and 14.2% , respectively. The age and the incidence of the hypertension of the patients with cerebral vascular structural abnormalities were significantly lower than those of the patients without cerebral vascular structural abnormalities (P<0.05). There were positive correlations between subacute spontaneous cerebral hemorrhage and the age and the incidence of hypertension (r=0.43, r=0.46, P<0.05). The rates of cerebrovascular malformation detected with MRA and DSA had no statistically significant difference. The DSA was regarded as detection gold standard, the sensitivities and specificities of MRA in detection of cerebrovascular malformation were 98.8% and 96.9% . Conclusion: The abnormal vascular structures of patients with subacute spontaneous intracerebral hemorrhage can be detected mostly by MRA and DSA. MRA has the advantages of non-invasion, which is worthy to be applied in clinic. (authors)

  15. The analysis of cerebro-vascular circulation time using digital subtraction angiography (DSA)

    Energy Technology Data Exchange (ETDEWEB)

    Han, D. G.; Kim, D. H.; Lee, H. K.; Kwon, K. H.; Kim, K. J. [Soonchunhyang University College of Medicine, Asan (Korea, Republic of)

    1986-10-15

    We analyzed the cerebral arterio-venous circulation time of 141 cases of cranial DSA in 136 patients, for the assessment of cerebral circulatory dynamics. IV-DSA was 111 cases, IA-DSA 30 cases. The results were as follows: 1. There was no significant difference in arterio-venous circulation time between IA-DSA and IV-DSA, if the disease pattern was not considered (P > 0.1). 2. Prolongation of arterio-venous circulation time was noted in the cases of cerebral (cerebellar) hemorrhage, subarachnoid hemorrhage, intracranial hematoma, brain abscess, acute stage of cerebra-vascular occlusive disease, acute stage of postoperative follow up, and acute stage of cerebral contusion (p > 0.05). 3. Compared the chronic stage of cerebra-vascular occlusive disease, postoperative follow up, and cerebral contusion with acute stage, significant decrement of arterio-venous circulation time was resulted (p > 0.05). 4. DSA was a useful modality for the assessment of circulatory dynamics, including measurement of arterio-venous circulation time.

  16. Resource conservation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP). Attachments: Volume 4 of 4

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Volume IV contains the following attachments for Module IV: VOC monitoring plan for bin-room tests (Appendix D12); bin emission control and VOC monitoring system drawings; bin scale test room ventilation drawings; WIPP supplementary roof support system, underground storage area, room 1, panel 1, DOE/WIPP 91-057; and WIPP supplementary roof support system, room 1, panel 1, geotechnical field data analysis bi-annual report, DOE/WIPP 92-024.

  17. HANFORD SITE RIVER PROTECTION PROJECT (RPP) TRANSURANIC (TRU) TANK WASTE IDENTIFICATION & PLANNING FOR REVRIEVAL TREATMENT & EVENTUAL DISPOSAL AT WIPP

    Energy Technology Data Exchange (ETDEWEB)

    KRISTOFZSKI, J.G.; TEDESCHI, R.; JOHNSON, M.E.; JENNINGS, M

    2006-01-18

    The CH2M HILL Manford Group, Inc. (CHG) conducts business to achieve the goals of the Office of River Protection (ORP) at Hanford. As an employee owned company, CHG employees have a strong motivation to develop innovative solutions to enhance project and company performance while ensuring protection of human health and the environment. CHG is responsible to manage and perform work required to safely store, enhance readiness for waste feed delivery, and prepare for treated waste receipts for the approximately 53 million gallons of legacy mixed radioactive waste currently at the Hanford Site tank farms. Safety and environmental awareness is integrated into all activities and work is accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public. This paper focuses on the innovative strategy to identify, retrieve, treat, and dispose of Hanford Transuranic (TRU) tank waste at the Waste Isolation Pilot Plant (WIPP).

  18. Resource conservation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume I contains the following attachments for Module II: waste analysis plan; quality assurance program plan for the Waste Isolation Pilot Plant (WIPP) Experiment Waste Characterization Program(QAPP); WIPP Characterization Sampling and Analysis Guidance Manual (Plan)(SAP); and no migration Determination Requirement Summary (NMD)

  19. Just in Time DSA the Hanford Nuclear Safety Basis Strategy

    International Nuclear Information System (INIS)

    JACKSON, M.W.

    2002-01-01

    The U.S. Department of Energy, Richland Operations Office (RL) is responsible for 30 hazard category 2 and 3 nuclear facilities that are operated by its prime contractors, Fluor Hanford, Incorporated (FHI), Bechtel Hanford, Incorporated (BHI) and Pacific Northwest National Laboratory (PNNL). The publication of Title 10, Code of Federal Regulations, Part 830, Subpart B, Safely Basis Requirements (the Rule) in January 2001 requires that the Documented Safety Analyses (DSA) for these facilities be reviewed against the requirements of the Rule. Those DSAs that do not meet the requirements must either be upgraded to satisfy the Rule, or an exemption must be obtained. RL and its prime contractors have developed a Nuclear Safety Strategy that provides a comprehensive approach for supporting RL's efforts to meet its long-term objectives for hazard category 2 and 3 facilities while also meeting the requirements of the Rule. This approach will result in a reduction of the total number of safety basis documents that must be developed and maintained to support the remaining mission and closure of the Hanford Site and ensure that the documentation that must be developed will support: Compliance with the Rule; A ''Just-In-Time'' approach to development of Rule-compliant safety bases supported by temporary exemptions; and Consolidation of safety basis documents that support multiple facilities with a common mission (e.g. decontamination, decommissioning and demolition [DD and D], waste management, surveillance and maintenance). This strategy provides a clear path to transition the safety bases for the various Hanford facilities from support of operation and stabilization missions through DD and D to accelerate closure. This ''Just-In-Time'' Strategy can also be tailored for other DOE Sites, creating the potential for large cost savings and schedule reductions throughout the DOE complex

  20. Just in Time DSA the Hanford Nuclear Safety Basis Strategy

    Energy Technology Data Exchange (ETDEWEB)

    JACKSON, M.W.

    2002-06-01

    The U.S. Department of Energy, Richland Operations Office (RL) is responsible for 30 hazard category 2 and 3 nuclear facilities that are operated by its prime contractors, Fluor Hanford, Incorporated (FHI), Bechtel Hanford, Incorporated (BHI) and Pacific Northwest National Laboratory (PNNL). The publication of Title 10, Code of Federal Regulations, Part 830, Subpart B, Safely Basis Requirements (the Rule) in January 2001 requires that the Documented Safety Analyses (DSA) for these facilities be reviewed against the requirements of the Rule. Those DSAs that do not meet the requirements must either be upgraded to satisfy the Rule, or an exemption must be obtained. RL and its prime contractors have developed a Nuclear Safety Strategy that provides a comprehensive approach for supporting RL's efforts to meet its long-term objectives for hazard category 2 and 3 facilities while also meeting the requirements of the Rule. This approach will result in a reduction of the total number of safety basis documents that must be developed and maintained to support the remaining mission and closure of the Hanford Site and ensure that the documentation that must be developed will support: Compliance with the Rule; A ''Just-In-Time'' approach to development of Rule-compliant safety bases supported by temporary exemptions; and Consolidation of safety basis documents that support multiple facilities with a common mission (e.g. decontamination, decommissioning and demolition [DD&D], waste management, surveillance and maintenance). This strategy provides a clear path to transition the safety bases for the various Hanford facilities from support of operation and stabilization missions through DD&D to accelerate closure. This ''Just-In-Time'' Strategy can also be tailored for other DOE Sites, creating the potential for large cost savings and schedule reductions throughout the DOE complex.

  1. Electrochemical degradation of reactive dyes at different DSA compositions

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Rodrigo G. da; Aquino Neto, Sydney; Andrade, Adalgisa R. de, E-mail: ardandra@ffclrp.usp.b [Universidade de Sao Paulo (FFCLRP/USP), Ribeirao Preto, SP (Brazil). Fac. de Filosofia Ciencias e Letras. Dept. de Quimica

    2011-07-01

    This paper investigates the electrochemical oxidation of the reactive dyes reactive blue 4 (RB-4) and reactive orange 16 (RO-16) on RuO{sub 2} dimensionally stable anode (DSA) electrodes. Electrolysis was achieved under galvanostatic control as a function of supporting electrolyte and electrode composition. The electrolyses, performed in either the presence or absence of NaCl, were able to promote efficient color removal; moreover, at low chloride concentration (0.01 mol L{sup -1}), total color removal was obtained after just 10 min of electrolysis, and a significant increase in total dye combustion was achieved for all the studied anodes in chloride medium (reaching ca. 80% - chemical oxygen demand - COD removal). No significant enhancement in dye color removal or mineralization was observed upon increasing chloride concentration. The influence of oxide composition on dye elimination seems to be significant in both media (with or without chloride), being Ti/Ru{sub 0.30}Ti{sub 0.70}O{sub 2}, the most active material for organic compound oxidation. The oxygen evolution reaction was shown to be a limiting reaction in both supporting electrolytes; i.e., NaCl and Na{sub 2}SO{sub 4}, and its competition with organic compound oxidation remained an obstacle. The adsorbable organo halogens formation study revealed that there is slight consumption of the undesirable species formed within the first minutes of the electrolysis, being Ti/(RuO{sub 2}){sub 0.70}(Ta{sub 2}O{sub 5}){sub 0.30} the most environmentally friendly composition. Both anode composition and chloride concentration affect the formation of these undesirable compounds. (author)

  2. Evaluation of proposed panel closure modifications at WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Lawrence E.; Silva, Matthew K.; Channell, James K.; Abel, John F.; Morgan, Dudley R.

    2001-12-31

    A key component in the design of the WIPP repository is the installation of concrete structures as panel seals in the intake and exhaust drifts after a panel has been filled with waste containers. As noted in the EPA final rule, the panel seal closure system is intended to block brine flow between the waste panels at the WIPP. On April 17, 2001, the DOE proposed seven modifications to the EPA concerning the design of the panel closure system. EPA approval of these modifications is necessary since the details of the panel design are specified in EPA’s final rule as a condition for WIPP certification. However, the EPA has not determined whether a rulemaking would be required for these proposed design modifications. On September 4, 2001, the DOE withdrew the request, noting that it would be resubmitted on a future date. The Environmental Evaluation Group (EEG) contracted with two engineers, Dr. John Abel and Dr. Rusty Morgan, to evaluate the proposed modifications. The EEG has accepted the conclusions and recommendations from these two experts: 1) replacement of Salado Mass Concrete with a generic salt-based concrete; 2) replacement of the explosion wall with a construction wall; 3) replacement of freshwater grouting with salt-based grouting; 4) option to allow surface or underground mixing; and 5) option to allow up to one year for completion of closure. The proposed modification to allow local carbonate river rock as aggregate is acceptable pending demonstration that no problems will exist in the resulting concrete. The proposed modification to give the contractor discretion in removal of steel forms is not supported. Instead, several recommendations are made to specifically reduce the number of forms left, thereby reducing potential migration pathways.

  3. A regional water balance for the WIPP site and surrounding area

    International Nuclear Information System (INIS)

    Hunter, R.L.

    1987-01-01

    A water balance or budget is developed as an accounting of the components of a closed hydrologic system. In the WIPP study area, water-budget techniques have previously been used to compute leakage from Lake Avalon and from potash refinery spoil ponds. A general expression for a closed hydrologic system is presented. In a developed area like the WIPP region, the water budget must include many usage factors, such as municipal or industrial pumpage. In the WIPP water-budget study area, inflows are precipitation, surface- and ground-water inflow, and the artificial addition of surface and ground water. Outflows are surface runoff, evaporation and transpiration, and ground-water outflow. Changes in storage in the WIPP region have also been documented. The WIPP water balance described here is based on a combination of long-term averages and figures for 1980. 12 refs., 5 figs., 1 tab

  4. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  5. PASS: a component of Desk Top PA for the WIPP

    International Nuclear Information System (INIS)

    Crawford, M.B.; Wilmot, R.D.; Galson, D.A.; Swift, P.N.; Fewell, M.E.

    1998-01-01

    There is a growing recognition internationally of the need to demonstrate comprehensiveness in order to build confidence in performance assessments (PAs) for radioactive waste disposal projects. This has resulted in a number of methodologies being developed to formalize the process of defining and documenting the decision basis that underlies a PA. Such methodologies include process influence diagrams and the rock engineering system (RES) matrix. However, these methodologies focus mainly on the conceptualization of the disposal system and do not provide a ready framework to document the decisions behind the model development and parameterization of the PA system. The Performance Assessment Support System (PASS) is a flexible electronic tool designed to increase the transparency and traceability of decision making in the entire PA process. An application of PASS has been developed for the Waste Isolation Pilot Plant (WIPP) where it forms an important component of Desk Top PA, a PC-based PA computational environment under development at Sandia National Laboratories to document, plan, and support management decisions and to assess performance for the WIPP recertification process. This desk-top PA environment is also aimed at providing scientifically-based decision support for assessing the performance of nuclear and hazardous waste management and environmental clean-up systems

  6. WIPP Benchmark calculations with the large strain SPECTROM codes

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, G.D.; DeVries, K.L. [RE/SPEC, Inc., Rapid City, SD (United States)

    1995-08-01

    This report provides calculational results from the updated Lagrangian structural finite-element programs SPECTROM-32 and SPECTROM-333 for the purpose of qualifying these codes to perform analyses of structural situations in the Waste Isolation Pilot Plant (WIPP). Results are presented for the Second WIPP Benchmark (Benchmark II) Problems and for a simplified heated room problem used in a parallel design calculation study. The Benchmark II problems consist of an isothermal room problem and a heated room problem. The stratigraphy involves 27 distinct geologic layers including ten clay seams of which four are modeled as frictionless sliding interfaces. The analyses of the Benchmark II problems consider a 10-year simulation period. The evaluation of nine structural codes used in the Benchmark II problems shows that inclusion of finite-strain effects is not as significant as observed for the simplified heated room problem, and a variety of finite-strain and small-strain formulations produced similar results. The simplified heated room problem provides stratigraphic complexity equivalent to the Benchmark II problems but neglects sliding along the clay seams. The simplified heated problem does, however, provide a calculational check case where the small strain-formulation produced room closures about 20 percent greater than those obtained using finite-strain formulations. A discussion is given of each of the solved problems, and the computational results are compared with available published results. In general, the results of the two SPECTROM large strain codes compare favorably with results from other codes used to solve the problems.

  7. WIPP Compliance Certification Application calculations parameters. Part 1: Parameter development

    International Nuclear Information System (INIS)

    Howarth, S.M.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed, which provided in-depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. Nearly 1,500 parameters were developed using information gathered from this program; the parameters were input to numerical models for WIPP Compliance Certification Application (CCA) Performance Assessment (PA) calculations. The CCA probabilistic codes frequently require input values that define a statistical distribution for each parameter. Developing parameter distributions begins with the assignment of an appropriate distribution type, which is dependent on the type, magnitude, and volume of data or information available. The development of the parameter distribution values may require interpretation or statistical analysis of raw data, combining raw data with literature values, scaling of lab or field data to fit code grid mesh sizes, or other transformation. Parameter development and documentation of the development process were very complicated, especially for those parameters based on empirical data; they required the integration of information from Sandia National Laboratories (SNL) code sponsors, parameter task leaders (PTLs), performance assessment analysts (PAAs), and experimental principal investigators (PIs). This paper, Part 1 of two parts, contains a discussion of the parameter development process, roles and responsibilities, and lessons learned. Part 2 will discuss parameter documentation, traceability and retrievability, and lessons learned from related audits and reviews

  8. WIPP Salado hydrology program data report No. 1

    International Nuclear Information System (INIS)

    Saulnier, G.J. Jr.; Domski, P.S.; Palmer, J.B.; Roberts, R.M.; Stensrud, W.A.; Jensen, A.L.

    1991-05-01

    WIPP Salado Hydrology Program Data Report number-sign 1 presents hydrologic data collected during permeability tests of the Salado Formation performed from August 1988 through December 1989. Analysis and interpretation of the test data are presented in a separate report. The report presents the results of the drilling and testing of six boreholes drilled from the WIPP underground facility 655 m below ground surface in the Salado Formation. Permeability tests were conducted using multipacker test tools with inflatable packers to isolate borehole intervals to allow formation pore-pressure buildup and subsequent pulse-withdrawal tests. Test data include pressures and temperatures in brine-filled, packer-isolated test intervals and borehole-closure and axial test-tool-movement measurements. Permeability tests were performed after installing multipacker test tools in test boreholes, inflating the packers, and allowing pressures to build up in the isolated intervals. Pulse-withdrawal tests were performed after buildup pressures approached the apparent formation pore pressure. Pulse injections were sometimes performed to increase the fluid pressures in isolated intervals. Compliance tests were conducted in lengths of steel and stainless-steel casing to evaluate the mechanical performance of the multipacker test tools. The stainless-steel compliance-test chamber was installed with externally mounted thermocouples in a downward-angled borehole in Experimental Room 4. Compliance tests included leak tests and simulated pulse-injection and pulse-withdrawal sequences. 9 refs., 143 figs., 2 tabs

  9. Nuclear waste repository transparency technology test bed demonstrations at WIPP

    International Nuclear Information System (INIS)

    Betsill J, David; Elkins, Ned Z.; Wu, Chuan-Fu; Mewhinney, James D.; Aamodt, Paul

    2000-01-01

    Secretary of Energy, Bill Richardson, has stated that one of the nuclear waste legacy issues is ''The challenge of managing the fuel cycle's back end and assuring the safe use of nuclear power.'' Waste management (i.e., the back end) is a domestic and international issue that must be addressed. A key tool in gaining acceptance of nuclear waste repository technologies is transparency. Transparency provides information to outside parties for independent assessment of safety, security, and legitimate use of materials. Transparency is a combination of technologies and processes that apply to all elements of the development, operation, and closure of a repository system. A test bed for nuclear repository transparency technologies has been proposed to develop a broad-based set of concepts and strategies for transparency monitoring of nuclear materials at the back end of the fuel/weapons cycle. WIPP is the world's first complete geologic repository system for nuclear materials at the back end of the cycle. While it is understood that WIPP does not currently require this type of transparency, this repository has been proposed as realistic demonstration site to generate and test ideas, methods, and technologies about what transparency may entail at the back end of the nuclear materials cycle, and which could be applicable to other international repository developments. An integrated set of transparency demonstrations was developed and deployed during the summer, and fall of 1999 as a proof-of-concept of the repository transparency technology concept. These demonstrations also provided valuable experience and insight into the implementation of future transparency technology development and application. These demonstrations included: Container Monitoring Rocky Flats to WIPP; Underground Container Monitoring; Real-Time Radiation and Environmental Monitoring; Integrated level of confidence in the system and information provided. As the world's only operating deep geologic

  10. Nuclear waste repository transparency technology test bed demonstrations at WIPP

    Energy Technology Data Exchange (ETDEWEB)

    BETSILL,J. DAVID; ELKINS,NED Z.; WU,CHUAN-FU; MEWHINNEY,JAMES D.; AAMODT,PAUL

    2000-01-27

    Secretary of Energy, Bill Richardson, has stated that one of the nuclear waste legacy issues is ``The challenge of managing the fuel cycle's back end and assuring the safe use of nuclear power.'' Waste management (i.e., the back end) is a domestic and international issue that must be addressed. A key tool in gaining acceptance of nuclear waste repository technologies is transparency. Transparency provides information to outside parties for independent assessment of safety, security, and legitimate use of materials. Transparency is a combination of technologies and processes that apply to all elements of the development, operation, and closure of a repository system. A test bed for nuclear repository transparency technologies has been proposed to develop a broad-based set of concepts and strategies for transparency monitoring of nuclear materials at the back end of the fuel/weapons cycle. WIPP is the world's first complete geologic repository system for nuclear materials at the back end of the cycle. While it is understood that WIPP does not currently require this type of transparency, this repository has been proposed as realistic demonstration site to generate and test ideas, methods, and technologies about what transparency may entail at the back end of the nuclear materials cycle, and which could be applicable to other international repository developments. An integrated set of transparency demonstrations was developed and deployed during the summer, and fall of 1999 as a proof-of-concept of the repository transparency technology concept. These demonstrations also provided valuable experience and insight into the implementation of future transparency technology development and application. These demonstrations included: Container Monitoring Rocky Flats to WIPP; Underground Container Monitoring; Real-Time Radiation and Environmental Monitoring; Integrated level of confidence in the system and information provided. As the world's only

  11. Multifunctional hardmask neutral layer for directed self-assembly (DSA) patterning

    Science.gov (United States)

    Guerrero, Douglas J.; Hockey, Mary Ann; Wang, Yubao; Calderas, Eric

    2013-03-01

    Micro-phase separation for directed self-assembly (DSA) can be executed successfully only when the substrate surface on which the block co-polymer (BCP) is coated has properties that are ideal for attraction to each polymer type. The neutral underlayer (NUL) is an essential and critical component in DSA feasibility. Properties conducive for BCP patterning are primarily dependent on "brush" or "crosslinked" random co-polymer underlayers. Most DSA flows also require a lithography step (reflection control) and pattern transfer schemes at the end of the patterning process. A novel multifunctional hardmask neutral layer (HM NL) was developed to provide reflection control, surface energy matching, and pattern transfer capabilities in a grapho-epitaxy DSA process flow. It was found that the ideal surface energy for the HM NL is in the range of 38-45 dyn/cm. The robustness of the HM NL against exposure to process solvents and developers was identified. Process characteristics of the BCP (thickness, bake time and temperature) on the HM NL were defined. Using the HM NL instead of three distinct layers - bottom anti-reflective coating (BARC) and neutral and hardmask layers - in DSA line-space pitch tripling and contact hole shrinking processes was demonstrated. Finally, the capability of the HM NL to transfer a pattern into a 100-nm spin-on carbon (SOC) layer was shown.

  12. Study of DSA-guided percutaneous puncture location of foramen oval

    International Nuclear Information System (INIS)

    Zhao Xiaojun; He Jiawei; Bai Guanghui; Shi Jianjing; Xu Chongyong; Zhan Gonghao

    2008-01-01

    Objective: To study the technique of digital substraction angiography (DSA)-guided percutaneous puncture location of foramen oval. Methods: 39 cases of trigeminal neuralgia were included in the study from Feb. 2004 to Oct. 2006. The patients were punctured by the amending anterior position. The f0ramen oval was displayed by moving the tube tilted 20-28 degree to the caudal and 16-23 degree to the healthy side. The direction and depth of the needles was determined on the lateral view. Then, radio-frequency thermocoagulation therapy was performed. Results: The needles were located in oval foramen in all the patients. Pain disappeared in 36 cases, alleviated in other cases, and no serious complication occurred during therapy. Conclusions: Oval foramen locations by DSA can improve the successful rate of operation. The foramen oval can be clearly displayed by DSA-guided in amending position, with comfortable position for patients. (authors)

  13. DSA volumetric 3D reconstructions of intracranial aneurysms: A pictorial essay

    Science.gov (United States)

    Cieściński, Jakub; Serafin, Zbigniew; Strześniewski, Piotr; Lasek, Władysław; Beuth, Wojciech

    2012-01-01

    Summary A gold standard of cerebral vessel imaging remains the digital subtraction angiography (DSA) performed in three projections. However, in specific clinical cases, many additional projections are required, or a complete visualization of a lesion may even be impossible with 2D angiography. Three-dimensional (3D) reconstructions of rotational angiography were reported to improve the performance of DSA significantly. In this pictorial essay, specific applications of this technique are presented in the management of intracranial aneurysms, including: preoperative aneurysm evaluation, intraoperative imaging, and follow-up. Volumetric reconstructions of 3D DSA are a valuable tool for cerebral vessels imaging. They play a vital role in the assessment of intracranial aneurysms, especially in evaluation of the aneurysm neck and the aneurysm recanalization. PMID:22844309

  14. Conventional renal angiography versus renal digital subtraction angiography (DSA) in the study of renovascular hypertension

    International Nuclear Information System (INIS)

    Essinger, A.; Morsier, B. de; Narbel, M.; Raimondi, S.

    1988-01-01

    A cost-benefit analysis comparing conventional renal angiography, IV and IA DSA and spot film cameras has been made in order to quantify the advantages and disadvantages of these techniques in screening for renal artery stenosis. DSA is the best modality of imaging, using very little films, easy to archive, with a spatial resolution inferior to conventional angiography but partially compensated by contrast resolution. The surface dose per image using a 512/512 matrix is two thirds less than a conventional film, giving thus an acceptable dose as long as technical personnel is well trained and thus the number of exposures is kept low. Spot film camera, due to its excellent spatial resolution, its low radiation dose and its low price, can also be used as a screening procedure but requires an arterial injection. DSA has furthermore the advantage of quantifying renal artery stenosis making future percutaneous transluminal angioplasty easier

  15. Superselective intra-arterial DSA in patients with femoral head necrosis and femoral neck fracture

    International Nuclear Information System (INIS)

    Langer, R.; Scholz, A.; Langer, M.; Astinet, F.; Ferstl, F.; Felix, R.; Schwetlick, G.

    1991-01-01

    The prospective study includes 25 patients without pathology of the femoral head for the evaluation of the normal femoral head perfusion. In addition 34 patients with femoral head necrosis underwent i.a. DSA preoperatively before pedicled pelvic bone grafting. 15 patients after pelvic bone graft operation and 7 patients with medial femoral head fracture were also examined via superselective DSA. In cases with femoral head necrosis a rarefaction or interruption of the rami nutricii proximales, or an occlusion of the medial circumflex femoral artery were observed. Patients with medial femoral neck fracture showed an interruption of the rami nutricii proximales of the femoral head. Postoperative DSA - after pedicled pelvic bone graft - revealed a regular arterial graft perfusion in 82%. (orig.) [de

  16. Mechanical Modeling of a WIPP Drum Under Pressure

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Jeffrey A. [Sandia National Laboratories, Albuquerque, NM (United States)

    2014-11-25

    Mechanical modeling was undertaken to support the Waste Isolation Pilot Plant (WIPP) technical assessment team (TAT) investigating the February 14th 2014 event where there was a radiological release at the WIPP. The initial goal of the modeling was to examine if a mechanical model could inform the team about the event. The intention was to have a model that could test scenarios with respect to the rate of pressurization. It was expected that the deformation and failure (inability of the drum to contain any pressure) would vary according to the pressurization rate. As the work progressed there was also interest in using the mechanical analysis of the drum to investigate what would happen if a drum pressurized when it was located under a standard waste package. Specifically, would the deformation be detectable from camera views within the room. A finite element model of a WIPP 55-gallon drum was developed that used all hex elements. Analyses were conducted using the explicit transient dynamics module of Sierra/SM to explore potential pressurization scenarios of the drum. Theses analysis show similar deformation patterns to documented pressurization tests of drums in the literature. The calculated failure pressures from previous tests documented in the literature vary from as little as 16 psi to 320 psi. In addition, previous testing documented in the literature shows drums bulging but not failing at pressures ranging from 69 to 138 psi. The analyses performed for this study found the drums failing at pressures ranging from 35 psi to 75 psi. When the drums are pressurized quickly (in 0.01 seconds) there is significant deformation to the lid. At lower pressurization rates the deformation of the lid is considerably less, yet the lids will still open from the pressure. The analyses demonstrate the influence of pressurization rate on deformation and opening pressure of the drums. Analyses conducted with a substantial mass on top of the closed drum demonstrate that the

  17. Application of DSA and ultrasonic blood rheography (Doppler) to benign paroxysmal positional vertigo

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, Nobuya; Wada, Yoshiro; Suzumura, Shigeo; Matsunaga, Takashi (Nara Medical Univ., Kashihara (Japan))

    1990-03-01

    Fourteen cases of benign paroxysmal positional vertigo (BPPV) were studied with cervical circulation using DSA and Doppler. DSA study showed 7 abnormal cases out of 10 cases of BPPV. The abnormal findings included 5 cases of stenosis and 5 cases of coiling and kinking in cervical vertebral arteries. Doppler study showed that vertebral a. and also carotid a. had low volume and high laterality of cervical blood circulation in parameter of flow and velocity. These findings suggest the cervical circulation disorder was one of background factors in pathogenesis of BPPV. (author).

  18. Benign Prostatic Hyperplasia: Cone-Beam CT in Conjunction with DSA for Identifying Prostatic Arterial Anatomy.

    Science.gov (United States)

    Wang, Mao Qiang; Duan, Feng; Yuan, Kai; Zhang, Guo Dong; Yan, Jieyu; Wang, Yan

    2017-01-01

    Purpose To describe findings in prostatic arteries (PAs) at digital subtraction angiography (DSA) and cone-beam computed tomography (CT) that allow identification of benign prostatic hyperplasia and to determine the value added with the use of cone-beam CT. Materials and Methods This retrospective single-institution study was approved by the institutional review board, and the requirement for written informed consent was waived. From February 2009 to December 2014, a total of 148 patients (mean age ± standard deviation, 70.5 years ± 14.5) underwent DSA of the internal iliac arteries and cone-beam CT with a flat-detector angiographic system before they underwent prostate artery embolization. Both the DSA and cone-beam CT images were evaluated by two interventional radiologists to determine the number of independent PAs and their origins and anastomoses with adjacent arteries. The exact McNemar test was used to compare the detection rate of the PAs and the anastomoses with DSA and with cone-beam CT. Results The PA anatomy was evaluated successfully by means of cone-beam CT in conjunction with DSA in all patients. Of the 296 pelvic sides, 274 (92.6%) had only one PA. The most frequent PA origin was the common gluteal-pudendal trunk with the superior vesicular artery in 118 (37.1%), followed by the anterior division of the internal iliac artery in 99 (31.1%), and the internal pudendal artery in 77 (24.2%) pelvic sides. In 67 (22.6%) pelvic sides, anastomoses to adjacent arteries were documented. The numbers of PA origins and anastomoses, respectively, that could be identified were significantly higher with cone-beam CT (301 of 318 [94.7%] and 65 of 67 [97.0%]) than with DSA (237 [74.5%] and 39 [58.2%], P Cone-beam CT provided essential information that was not available with DSA in 90 of 148 (60.8%) patients. Conclusion Cone-beam CT is a useful adjunctive technique to DSA for identification of the PA anatomy and provides information to help treatment planning during

  19. 1979 New Mexico legislative session: energy issues and legislation. [WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Barsumian, L.; Vandevender, S.G.

    1979-10-01

    This report is an account of the energy legislation and associated issues considered during the 1979 session of the 34th New Mexico Legislature. The session's major issue was the federal study of a proposed nuclear Waste Isolation Pilot Plant (WIPP) in New Mexico. A large proportion of time and effort was spent on resolving the state's formal position toward the federal project. However, other energy concerns were also significant even though they were neither as controversial nor as visible as the primary issue. The two most important laws enacted were the Radioactive Waste Consultation Act and the Radioactive Waste Transportation Act. The Legislature considered 47 other energy-related bills, of which 17 were enacted.

  20. Stochastic modelling of groundwater flow at the WIPP site

    International Nuclear Information System (INIS)

    Cliffe, K.A.; Jackson, C.P.

    1993-01-01

    A stochastic approach to modelling the groundwater flow in the vicinity of the WIPP site in New Mexico is described. A geostatistical model of the transmissivity of the Culebra dolomite was constructed on the basis of experimental measurements. The uncertainty in various quantities of interest in a repository performance assessment, such as the time to travel to the boundary of the model domain, were studied using a Monte-Carlo technique. The results indicate that conditioning the transmissivity on the measured values can lead to a significant reduction in uncertainty. The issue of validation of statistical models is also addressed. Several statistical tests were applied to the models and it is suggested that hypothesis testing can be a useful technique for validation

  1. The Brine Sampling and Evaluation Program (PSEP) at WIPP

    International Nuclear Information System (INIS)

    Deal, D.E.; Roggenthen, W.M.

    1989-01-01

    The Permian salt beds of the WIPP facility are virtually dry. The amount of water present in the rocks exposed in the excavations that is free to migrate under pressure gradients was estimated by heating salt samples to 95 degrees C and measuring weight loss. Clear balite contains about 0.22 weight percent water and the more argillaceous units average about 0.75 percent. Measurements made since 1984 as part of the Brine Sampling and Evaluation Program (BSEP) indicate that small amounts of this brine can migrate into the excavations and does accumulate in the underground environment. Brine seepage into drillholes monitored since thy were drilled show that brine seepage decreases with time and that many have dried up entirely. Weeping of brine from the walls of the repository excavations also decreases after two or more years. Chemical analyses of brines shows that they are sodium-chloride saturated and magnesium-rich

  2. WIPP Waste Characterization: Implementing Regulatory Requirements in the Real World

    International Nuclear Information System (INIS)

    Cooper Wayman, J.D.; Goldstein, J.D.

    1999-01-01

    It is imperative to ensure compliance of the Waste Isolation Pilot Project (WIPP) with applicable statutory and regulatory requirements. In particular, compliance with the waste characterization requirements of the Resource Conservation and Recovery Act (RCRA) and its implementing regulation found at 40 CFR Parts 262,264 and 265 for hazardous and mixed wastes, as well as those of the Atomic Energy Act of 1954, as amended, the Reorganization Plan No. 3 of 1970, the Nuclear Waste Policy Act of 1982, as amended, and the WIPP Land Withdrawal Act, as amended, and their implementing regulations found at 40 CFR Parts 191 and 194 for non-mixed radioactive wastes, are often difficult to ensure at the operational level. For example, where a regulation may limit a waste to a certain concentration, this concentration may be difficult to measure. For example, does the definition of transuranic waste (TRU) as 100 nCi/grain of alpha-emitting transuranic isotopes per gram of waste mean that the radioassay of a waste must show a reading of 100 plus the sampling and measurement error for the waste to be a TRU waste? Although the use of acceptable knowledge to characterize waste is authorized by statute, regulation and DOE Orders, its implementation is similarly beset with difficulty. When is a document or documents sufficient to constitute acceptable knowledge? What standard can be used to determine if knowledge is acceptable for waste characterization purposes? The inherent conflict between waste characterization regulatory requirements and their implementation in the real world, and the resolution of this conflict, will be discussed

  3. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  4. Performance assessment in support of compliance certification application for the WIPP project

    International Nuclear Information System (INIS)

    Jow, H.N.; Anderson, D.R.; Marietta, M.; Helton, J.; Basabilvazo, G.

    1998-03-01

    The Waste Isolation Pilot Plant (WIPP) is being developed by the US Department of Energy for the geologic (deep underground) disposal of transuranic (TRU) waste. A Compliance Certification Application (CCA) of the WIPP (1) for such disposal was submitted to the US Environmental Protection Agency (EPA) in October, 1996, and is currently under review, with a decision anticipated in late 1997. An important component of the CCA is a performance assessment (PA) for the WIPP carried out by Sandia National Laboratories. The final outcome of the PA is a complementary cumulative distribution function (CCDF) for radionuclide releases from the WIPP to the accessible environment and an assessment of the confidence with which this CCDF can be estimated. This paper describes the computational process used to develop the CCDF. The results of uncertainty and sensitivity analysis are also presented

  5. Mineralogy in the Waste Isolation Pilot Plant (WIPP) facility stratigraphic horizon

    International Nuclear Information System (INIS)

    Stein, C.L.

    1985-09-01

    Forty-six samples were selected for this study from two cores, one extending 50 ft up through the roof of the WIPP facility and the other penetrating 50 ft below the facility floor. These samples, selected from approximately every other foot of core length, represent the major lithologies present in the immediate vicinity of the WIPP facility horizon: ''clean'' halite, polyhalitic halite, argillaceous halite, and mixed polyhalitic-argillaceous halite. Samples were analyzed for non-NaCl mineralogy by determining weight percents of water- and EDTA-insoluble residues, which were then identified by x-ray diffraction. In general, WIPP halite contains at most 5 wt % non-NaCl residue. The major mineral constituents are quartz, magnesite, anhydrite, gypsum, polyhalite, and clays. Results of this study confirm that, in previous descriptions of WIPP core, trace mineral quantities have been visually overestimated by approximately an order of magnitude. 9 refs., 5 figs., 5 tabs

  6. Effects of microbial processes on gas generation under expected WIPP repository conditions: Annual report through 1992

    International Nuclear Information System (INIS)

    Francis, A.J.; Gillow, J.B.

    1993-09-01

    Microbial processes involved in gas generation from degradation of the organic constituents of transuranic waste under conditions expected at the Waste Isolation Pilot Plant (WIPP) repository are being investigated at Brookhaven National Laboratory. These laboratory studies are part of the Sandia National Laboratories -- WIPP Gas Generation Program. Gas generation due to microbial degradation of representative cellulosic waste was investigated in short-term ( 6 months) experiments by incubating representative paper (filter paper, paper towels, and tissue) in WIPP brine under initially aerobic (air) and anaerobic (nitrogen) conditions. Samples from the WIPP surficial environment and underground workings harbor gas-producing halophilic microorganisms, the activities of which were studied in short-term experiments. The microorganisms metabolized a variety of organic compounds including cellulose under aerobic, anaerobic, and denitrifying conditions. In long-term experiments, the effects of added nutrients (trace amounts of ammonium nitrate, phosphate, and yeast extract), no nutrients, and nutrients plus excess nitrate on gas production from cellulose degradation

  7. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP's environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence

  8. Geotechnical evaluation of the proposed WIPP site in southeast New Mexico

    International Nuclear Information System (INIS)

    Weart, W.D.

    1978-10-01

    The Department of Energy is proposing to demonstrate the acceptability of geologic disposal of radioactive waste by locating a Waste Isolation Pilot Plant (WIPP) in the salt beds 26 miles east of Carlsbad, New Mexico. The WIPP will serve as a permanent repository for defense generated transuranic contaminated waste and will also be used as a facility in which experiments and demonstrations with all radioactive waste types can be conducted. The present area being proposed for the WIPP is the second such location in the Delaware Basin for which new site data have been developed; the first site proved geologically unacceptable. Ecologic and socioeconomic aspects have been investigated and extensive geophysical, geological and hydrologic studies have been conducted to allow an evaluation of site acceptability. Geotechnical aspects of site characterization are examined. These studies are now sufficiently complete that the site can be recommended for further development of the WIPP

  9. Use of Performance Assessment in Support of Waste Isolation Pilot Plant (WIPP) Programmatic Activity Planning

    International Nuclear Information System (INIS)

    BASABILVAZO, GEORGE; JOW, HONG-NIAN; LARSON, KURT W.; MARIETTA, MELVIN G.

    1999-01-01

    The Waste Isolation Pilot Plant (WIPP) is being developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. A Compliance Certification Application (CCA) of the WIPP for such disposal was submitted to the U.S. Environmental Protection Agency (EPA) in October 1996, and was approved by EPA in May 1998. In June 1998, two separate, but related, lawsuits were filed, one against DOE and one against EPA. On March 22, 1999, the court ruled in favor of DOE, and on March 26, 1999, DOE formally began disposal operations at the WIPP for non-mixed (non-hazardous) TRU waste. Before the WIPP can begin receiving mixed (hazardous) TRU waste, a permit from the State of New Mexico for hazardous waste disposal needs to be issued. It is anticipated that the State of New Mexico will issue a hazardous waste permit by November 1999. It is further anticipated that the EPA lawsuit will be resolved by July 1999. Congress (Public Law 102-579, Section 8(f)) requires the WIPP project to be recertified by the EPA at least as frequently as once every five years from the first receipt of TRU waste at the WIPP site. As part of the DOE's WIPP project recertification strategy, Sandia National Laboratories (SNL) has used systems analysis and performance assessment to prioritize its scientific and engineering research activities. Two 1998 analyses, the near-field systems analysis and the annual sensitivity analysis, are discussed here. Independently, the two analyses arrived at similar conclusions regarding important scientific activities associated with the WIPP. The use of these techniques for the recent funding allocations at SNL's WIPP project had several beneficial effects. It increased the level of acceptance among project scientists that management had fairly and credibly compared alternatives when making prioritization decisions. It improved the ability of SNL and its project sponsor, the Carlsbad Area Office of the DOE, to

  10. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-01-01

    This volume contains Appendix D2, engineering design basis reports. Contents include: Design considerations for the waste hoist of the Waste Isolation Pilot Plant (WIPP); A site-specific study of wind and tornado probabilities at the WIPP Site in southeast New Mexico; Seismic evaluation report of underground facilities; and calculations for analysis of wind loads and tornado loads for WHB, seismic calculations, calculations for VOC-10 monitoring system, and for shaft at station A

  11. Actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP): FY94 results

    International Nuclear Information System (INIS)

    Novak, C.F.

    1995-08-01

    This document contains six reports on actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP). These reports, completed in FY94, are relevant to the estimation of the potential dissolved actinide concentrations in WIPP brines under repository breach scenarios. Estimates of potential dissolved actinide concentrations are necessary for WIPP performance assessment calculations. The specific topics covered within this document are: the complexation of oxalate with Th(IV) and U(VI); the stability of Pu(VI) in one WIPP-specific brine environment both with and without carbonate present; the solubility of Nd(III) in a WIPP Salado brine surrogate as a function of hydrogen ion concentration; the steady-state dissolved plutonium concentrations in a synthetic WIPP Culebra brine surrogate; the development of a model for Nd(III) solubility and speciation in dilute to concentrated sodium carbonate and sodium bicarbonate solutions; and the development of a model for Np(V) solubility and speciation in dilute to concentrated sodium Perchlorate, sodium carbonate, and sodium chloride media

  12. Value of digital angiography as a substitute for film angiography in comparison with DSA

    International Nuclear Information System (INIS)

    Langer, M.; Mitsch, E.; Zwicker, C.; Scholz, A.; Felix, R.; Langer, R.

    1988-01-01

    The authors performed a prospective study to evaluate whether digital angiography (DA) can provide diagnostic image quality to reduce the need for film studies. The study is based on more than 100 arterial DSA examinations that were intra- and interindividually compared with the DA studies of the same arteries. It was demonstrated that DA with the same quantity of contrast medium as DSA is diagnostic in 80% of cases for abdominal, pelvic, and femoral arteries and in 85% for brachial arteries but in only 56% for carotid arteries if an aortic arch injection is performed. For all examinations, image quality with DSA was excellent in 86%, good in 9%, and diagnostic in 5%, with DA, it was excellent in 5%, good in 49%, diagnostic in 22%, and bad in 24% (90% of these were supraaortic studies). The results of this study indicate that it is worth trying a DA study when DSA is nondiagnostic because of artifacts, if a selective intraarterial contrast medium injection can be performed

  13. Hepatic VX2 tumor after portal vein occlusion in rabbits: evaluation with DSA

    International Nuclear Information System (INIS)

    Qi Yueyong; Zou Liguang; Dai Shuhua; Zhang Qichuan; Chen Lin; Huang Xiaobing; Huan Guangqiang

    2006-01-01

    Objective: To study the value of DSA for hepatic vascular anatomy, and to evaluate the efficacy of portal vein occlusion in rabbits with hepatic VX2 tumor. Methods: Twenty New Zealand white rabbits were randomly divided into two groups with 10 in each group, including test group A and positive control group B of ham operation. For the test group A, portal branch ligation (PBL) was performed for the left external branch after 3 weeks of the tumor implantation to the left external lobe. Two weeks later, the DSA of hepatic artery and portal vein were performed in all of the rabbits. Results: The total displaying effectiveness of the branches of hepatic artery by DSA was better than that by vascular perfusion. There was hypovascular blood supply to hepatic artery implantation of the tumor in the test group A, comparing with that of the group B. Conclusion: DSA can clearly display special details of the hepatic vascular anatomy in rabbits, and play an important role in post-procedural evaluation of the portal vein occlusion in rabbits. (authors)

  14. Efficacy of balloon temporary occlusion and intraoperative DSA in surgically difficult aneurysm

    Energy Technology Data Exchange (ETDEWEB)

    Ezura, Masayuki; Mizoi, Kazuo; Yoshimoto, Takashi (Tohoku Univ., Sendai (Japan). Inst. of Brain Diseases); Takahashi, Akira

    1993-11-01

    A digital subtraction angiographic (DSA) apparatus has been installed in one of our operating rooms since April 1987. We performed intraoperative DSA in 42 aneurysmal surgeries in 38 patients and balloon temporary occlusion in 33 surgeries. The aneurysm was on an internal carotid artery in 26 cases and on the vertebro-basilar system in 16. A heparin-coated catheter (Anthron, Toray, Tokyo), 6 french in diameter, was inserted transfemorally and was put in a parent artery under general anesthesia. A balloon was temporarily inflated to determine inflation volume. The balloon catheter was soon deflated and was drawn back into the introducing catheter to avoid developing microembolus. The patients were not systemically heparinized but the introducing catheters were slowly flushed with heparinized saline during operation. Then a craniotomy was carried out. Next DSA was performed when temporary occlusion or confirmation of clipping was necessary. In cases of balloon temporary occlusion, the operating field was not obstructed as it is when a temporary clip is used, despite adequate flow reduction of the parent artery. After DSA for confirmation of clipping adjustment of it was performed in 12 cases out of 42. No complications occurred due to use of an introducing or a balloon catheter. We conclude that combined intravascular and neurosurgical approach, particularly for the large aneurysms with the difficulty of proximal control, can be a useful method of treatment. (author).

  15. Efficacy of balloon temporary occlusion and intraoperative DSA in surgically difficult aneurysm

    International Nuclear Information System (INIS)

    Ezura, Masayuki; Mizoi, Kazuo; Yoshimoto, Takashi; Takahashi, Akira.

    1993-01-01

    A digital subtraction angiographic (DSA) apparatus has been installed in one of our operating rooms since April 1987. We performed intraoperative DSA in 42 aneurysmal surgeries in 38 patients and balloon temporary occlusion in 33 surgeries. The aneurysm was on an internal carotid artery in 26 cases and on the vertebro-basilar system in 16. A heparin-coated catheter (Anthron, Toray, Tokyo), 6 french in diameter, was inserted transfemorally and was put in a parent artery under general anesthesia. A balloon was temporarily inflated to determine inflation volume. The balloon catheter was soon deflated and was drawn back into the introducing catheter to avoid developing microembolus. The patients were not systemically heparinized but the introducing catheters were slowly flushed with heparinized saline during operation. Then a craniotomy was carried out. Next DSA was performed when temporary occlusion or confirmation of clipping was necessary. In cases of balloon temporary occlusion, the operating field was not obstructed as it is when a temporary clip is used, despite adequate flow reduction of the parent artery. After DSA for confirmation of clipping adjustment of it was performed in 12 cases out of 42. No complications occurred due to use of an introducing or a balloon catheter. We conclude that combined intravascular and neurosurgical approach, particularly for the large aneurysms with the difficulty of proximal control, can be a useful method of treatment. (author)

  16. DSA-WDS Common Requirements: Developing a New Core Data Repository Certification

    Science.gov (United States)

    Minster, J. B. H.; Edmunds, R.; L'Hours, H.; Mokrane, M.; Rickards, L.

    2016-12-01

    The Data Seal of Approval (DSA) and the International Council for Science - World Data System (ICSU-WDS) have both developed minimally intensive core certification standards whereby digital repositories supply evidence that they are trustworthy and have a long-term outlook. Both DSA and WDS applicants have found core certification to be beneficial: building stakeholder confidence, enhancing the repository's reputation, and demonstrating that it is following good practices; as well as stimulating the repository to focus on processes and procedures, thereby achieving ever higher levels of professionalism over time.The DSA and WDS core certifications evolved independently serving initially different communities but both initiatives are multidisciplinary with catalogues of criteria and review procedures based on the same principles. Hence, to realize efficiencies, simplify assessment options, stimulate more certifications, and increase impact on the community, the Repository Audit and Certification DSA-WDS Partnership Working Group (WG) was established under the umbrella of the Research Data Alliance (RDA). The WG conducted a side-by-side analysis of both frameworks to unify the wording and criteria, ultimately leading to a harmonized Catalogue of Common Requirements for core certification of repositories—as well as a set of Common Procedures for their assessment.This presentation will focus on the collaborative effort by DSA and WDS to establish (1) a testbed comprising DSA and WDS certified data repositories to validate both the new Catalogue and Procedures, and (2) a joint Certification Board towards their practical implementation. We will describe:• The purpose and methodology of the testbed, including selection of repositories to be assessed against the common standard.• The results of the testbed, with an in-depth look at some of the comments received and issues highlighted.• General insights gained from evaluating the testbed results, the subsequent

  17. A facility design for repackaging ORNL CH-TRU legacy waste in Building 3525

    International Nuclear Information System (INIS)

    Huxford, T.J.; Cooper, R.H. Jr.; Davis, L.E.; Fuller, A.B.; Gabbard, W.A.; Smith, R.B.; Guay, K.P.; Smith, L.C.

    1995-07-01

    For the last 25 years, the Oak Ridge National Laboratory (ORNL) has conducted operations which have generated solid, contact-handled transuranic (CH-TRU) waste. At present the CH-TRU waste inventory at ORNL is about 3400 55-gal drums retrievably stored in RCRA-permitted, aboveground facilities. Of the 3400 drums, approximately 2600 drums will need to be repackaged. The current US Department of Energy (DOE) strategy for disposal of these drums is to transport them to the Waste Isolation Pilot Plant (WIPP) in New Mexico which only accepts TRU waste that meets a very specific set of criteria documented in the WIPP-WAC (waste acceptance criteria). This report describes activities that were performed from January 1994 to May 1995 associated with the design and preparation of an existing facility for repackaging and certifying some or all of the CH-TRU drums at ORNL to meet the WIPP-WAC. For this study, the Irradiated Fuel Examination Laboratory (IFEL) in Building 3525 was selected as the reference facility for modification. These design activities were terminated in May 1995 as more attractive options for CH-TRU waste repackaging were considered to be available. As a result, this document serves as a final report of those design activities

  18. Status Report on the Microbial Characterization of Halite and Groundwater Samples from the WIPP

    International Nuclear Information System (INIS)

    Swanson, Juliet S.; Reed, Donald T.; Ams, David A.; Norden, Diana; Simmons, Karen A.

    2012-01-01

    This report summarizes the progress made in the ongoing task of characterizing the microbial community structures within the WIPP repository and in surrounding groundwaters. Through cultivation and DNA-based identification, the potential activity of these organisms is being inferred, thus leading to a better understanding of their impact on WIPP performance. Members of the three biological domains - Bacteria, Archaea, and Eukarya (in this case, Fungi) - that are associated with WIPP halite have been identified. Thus far, their activity has been limited to aerobic respiration; anaerobic incubations are underway. WIPP halite constitutes the near-field microbial environment. We expect that microbial activity in this setting will proceed from aerobic respiration, through nitrate reduction to focus on sulfate reduction. This is also the current WIPP performance assessment (PA) position. Sulfate reduction can occur at extremely high ionic strengths, and sulfate is available in WIPP brines and in the anhydrite interbeds. The role of methanogenesis in the WIPP remains unclear, due to both energetic constraints imposed by a high-salt environment and substrate selectivity, and it is no longer considered in PA. Archaea identified in WIPP halite thus far fall exclusively within the family Halobacteriaceae. These include Halobacterium noricense, cultivated from both low- and high-salt media, and a Halorubrum-like species. The former has also been detected in other salt mines worldwide; the latter likely constitutes a new species. Little is known of its function, but it was prevalent in experiments investigating the biodegradation of organic complexing agents in WIPP brines. Bacterial signatures associated with WIPP halite include members of the phylum Proteobacteria - Halomonas, Pelomonas, Limnobacter, and Chromohalobacter - but only the latter has been isolated. Also detected and cultivated were Salinicoccus and Nesterenkonia spp. Fungi were also isolated from halite. Although

  19. Status Report on the Microbial Characterization of Halite and Groundwater Samples from the WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Swanson, Juliet S. [Los Alamos National Laboratory; Reed, Donald T. [Los Alamos National Laboratory; Ams, David A. [Los Alamos National Laboratory; Norden, Diana [Ohio State University; Simmons, Karen A. [Los Alamos National Laboratory

    2012-07-10

    This report summarizes the progress made in the ongoing task of characterizing the microbial community structures within the WIPP repository and in surrounding groundwaters. Through cultivation and DNA-based identification, the potential activity of these organisms is being inferred, thus leading to a better understanding of their impact on WIPP performance. Members of the three biological domains - Bacteria, Archaea, and Eukarya (in this case, Fungi) - that are associated with WIPP halite have been identified. Thus far, their activity has been limited to aerobic respiration; anaerobic incubations are underway. WIPP halite constitutes the near-field microbial environment. We expect that microbial activity in this setting will proceed from aerobic respiration, through nitrate reduction to focus on sulfate reduction. This is also the current WIPP performance assessment (PA) position. Sulfate reduction can occur at extremely high ionic strengths, and sulfate is available in WIPP brines and in the anhydrite interbeds. The role of methanogenesis in the WIPP remains unclear, due to both energetic constraints imposed by a high-salt environment and substrate selectivity, and it is no longer considered in PA. Archaea identified in WIPP halite thus far fall exclusively within the family Halobacteriaceae. These include Halobacterium noricense, cultivated from both low- and high-salt media, and a Halorubrum-like species. The former has also been detected in other salt mines worldwide; the latter likely constitutes a new species. Little is known of its function, but it was prevalent in experiments investigating the biodegradation of organic complexing agents in WIPP brines. Bacterial signatures associated with WIPP halite include members of the phylum Proteobacteria - Halomonas, Pelomonas, Limnobacter, and Chromohalobacter - but only the latter has been isolated. Also detected and cultivated were Salinicoccus and Nesterenkonia spp. Fungi were also isolated from halite. Although

  20. Scatter correction of vessel dropout behind highly attenuating structures in 4D-DSA

    Science.gov (United States)

    Hermus, James; Mistretta, Charles; Szczykutowicz, Timothy P.

    2015-03-01

    In Computed Tomographic (CT) image reconstruction for 4 dimensional digital subtraction angiography (4D-DSA), loss of vessel contrast has been observed behind highly attenuating anatomy, such as large contrast filled aneurysms. Although this typically occurs only in a limited range of projection angles, the observed contrast time course can be altered. In this work we propose an algorithm to correct for highly attenuating anatomy within the fill projection data, i.e. aneurysms. The algorithm uses a 3D-SA volume to create a correction volume that is multiplied by the 4D-DSA volume in order to correct for signal dropout within the 4D-DSA volume. The algorithm was designed to correct for highly attenuating material in the fill volume only, however with alterations to a single step of the algorithm, artifacts due to highly attenuating materials in the mask volume (i.e. dental implants) can be mitigated as well. We successfully applied our algorithm to a case of vessel dropout due to the presence of a large attenuating aneurysm. The performance was qualified visually as the affected vessel no longer dropped out on corrected 4D-DSA time frames. The correction was quantified by plotting the signal intensity along the vessel. Our analysis demonstrated our correction does not alter vessel signal values outside of the vessel dropout region but does increase the vessel values within the dropout region as expected. We have demonstrated that this correction algorithm acts to correct vessel dropout in areas with highly attenuating materials.

  1. Waste Isolation Pilot Plant (WIPP) conceptual design report. Part I: executive summary. Part II: facilities and system

    International Nuclear Information System (INIS)

    1977-06-01

    The pilot plant is developed for ERDA low-level contact-handled transuranic waste, ERDA remote-handled intermediate-level transuranic waste, and for high-level waste experiments. All wastes placed in the WIPP arrive at the site processed and packaged; no waste processing is done at the WIPP. All wastes placed into the WIPP are retrievable. The proposed site for WIPP lies 26 miles east of Carlsbad, New Mexico. This document includes the executive summary and a detailed description of the facilities and systems

  2. Waste Isolation Pilot Plant (WIPP) conceptual design report. Part I: executive summary. Part II: facilities and system

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-01

    The pilot plant is developed for ERDA low-level contact-handled transuranic waste, ERDA remote-handled intermediate-level transuranic waste, and for high-level waste experiments. All wastes placed in the WIPP arrive at the site processed and packaged; no waste processing is done at the WIPP. All wastes placed into the WIPP are retrievable. The proposed site for WIPP lies 26 miles east of Carlsbad, New Mexico. This document includes the executive summary and a detailed description of the facilities and systems. (DLC)

  3. CH-TRU Waste Content Codes

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2008-01-16

    The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments

  4. Health Cost of a Nuclear Waste Repository, WIPP

    Science.gov (United States)

    Kula, Erhun

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP), the United States of America’s first nuclear waste dumping site, has over the years generated a great deal of concern and controversy. The most sensitive aspect of this project is that it may impose serious health risks on future generations. The first leg of this project is about to be completed and at the time of writing the Department of Energy is planning to perform experiments with a small quantity of waste for operational demonstrations. If everything goes well, then towards the end of this decade large quantities of wastes will be transported to the site for disposal. This article reconsiders the health cost of this project from an economic perspective in light of recent developments in the field of social discounting. As in earlier studies, two cases of health risks are considered: total cancer and genetic deformity over a one million year cutoff period. The analysis shows that whereas ordinary discounting method wipes out the future health detriments, expressed in monetary terms, the modified discounting criterion retains a substantial proportion of such costs in economic analysis.

  5. Implications of the presence of petroleum resources on the integrity of the WIPP

    International Nuclear Information System (INIS)

    Silva, M.K.

    1994-06-01

    The Waste Isolation Pilot Plant (WIPP) is a facility of the US Department of Energy (DOE), designed and constructed for the permanent disposal of transuranic (TRU) defense waste. The WIPP is surrounded by reserves of potash, crude oil, and natural gas. These are attractive targets for exploratory drilling which could disrupt the integrity of the transuranic waste repository. The performance assessment calculations published to date have identified future drilling for oil and gas reserves as an event that may disrupt the repository and may release radionuclides in excess of the standards. Therefore, the probability of inadvertent human intrusion into the repository by drilling and its impact on the integrity of the repository must be carefully assessed. This report evaluates: (1) the studies funded by the DOE to examine the crude oil potential in the immediate vicinity of the WIPP; (2) the use of an elicitation exercise to predict future drilling rates for use in the calculation of the repository performance; and (3) the observed limitations of institutional controls. This report identifies the following issues that remain to be resolved: (1) the limited performance of blowout preventers after drilling into high pressure zones immediately adjacent to the WIPP Site Boundary; (2) reported problems with waterflooding operations in southeastern New Mexico; (3) reported water level rises in several wells completed in the Rustler Formation, south of the WIPP Site, possibly due to oil and gas wells or leaking injection wells; and (4) reports of inadequate well abandonment practices on BLM leases and the continued absence of enforceable regulations

  6. Modeling gas and brine migration for assessing compliance of the WIPP

    International Nuclear Information System (INIS)

    Vaughn, P.; Butcher, B.; Helton, J.; Swift, P.

    1993-01-01

    The US DOE is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico as a facility for the long-term disposal of defense-related transuranic (TRU) wastes. Use of the WIPP for waste disposal is contingent on demonstrations of compliance with applicable regulations of the US EPA. This paper addresses issues related to modeling gas and brine migration at the WIPP for compliance with both EPA 40 CFR 191 (the Standard) and 40 CFR 268.6 (the RCRA). At the request of the WIPP Project Integration Office (WPIO) of the DOE, the WIPP Performance Assessment (PA) Dept. of Sandia National Labs. (SNL) has completed preliminary uncertainty and sensitivity analyses of gas and brine migration away from the undisturbed repository. This paper contains descriptions of the numerical model and simulations, including model geometries and parameter values, and a summary of major conclusions from sensitivity analyses. Because significant transport of contaminants can only occur in a fluid (gas or brine) medium, two-phase flow modeling can provide an estimate of the distance to which contaminants can migrate. Migration of gas or brine beyond the RCRA open-quotes disposal-unit boundaryclose quotes or the Standard's accessible environment constitutes a potential, but not certain, violation and may require additional evaluations of contaminant concentrations

  7. Preliminary identification of interfaces for certification and transfer of TRU waste to WIPP

    International Nuclear Information System (INIS)

    Whitty, W.J.; Ostenak, C.A.; Pillay, K.K.S.

    1982-02-01

    This study complements the national program to certify that newly generated and stored, unclassified defense transuranic (TRU) wastes meet the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria. The objectives of this study were to identify (1) the existing organizational structure at each of the major waste-generating and shipping sites and (2) the necessary interfaces between the waste shippers and WIPP. The interface investigations considered existing waste management organizations at the shipping sites and the proposed WIPP organization. An effort was made to identify the potential waste-certifying authorities and the lines of communication within these organizations. The long-range goal of this effort is to develop practicable interfaces between waste shippers and WIPP to enable the continued generation, interim storage, and eventual shipment of certified TRU wastes to WIPP. Some specific needs identified in this study include: organizational responsibility for certification procedures and quality assurance (QA) program; simple QA procedures; and specification and standardization of reporting forms and procedures, waste containers, and container labeling, color coding, and code location

  8. Brain Blood Vessel Map Extraction Using Wavelet-based DSA Fusion

    Directory of Open Access Journals (Sweden)

    Saba Momeni

    2013-10-01

    Full Text Available Recently image fusion has prominent and applicable roles in medical image processing. Digital subtraction angiography (DSA image is applied to display map of blood vessels. In this essay, a new fusion algorithm for DSA serial images based on discrete wavelet transform coefficients is proposed. Fusion of high frequency coefficients is based on proposed fusion map and four evaluation criteria which introduce level of coefficient's energy. Our algorithm will be compared for different wavelet transforms and activity criteria for high frequency coefficients. The comparisons are based on the objective evaluation criteria which show measure of noise existence, sharpness and correlation between the fusion result and reference image. Finally, Meyer discrete wavelet transform is resulted as the best wavelet transform, and sum of modified Laplacian, local energy are introduced as activity level measurment for high and low frequency coefficients in process of brain vessel map extraction.

  9. Verification of directed self-assembly (DSA) guide patterns through machine learning

    Science.gov (United States)

    Shim, Seongbo; Cai, Sibo; Yang, Jaewon; Yang, Seunghune; Choi, Byungil; Shin, Youngsoo

    2015-03-01

    Verification of full-chip DSA guide patterns (GPs) through simulations is not practical due to long runtime. We develop a decision function (or functions), which receives n geometry parameters of a GP as inputs and predicts whether the GP faithfully produces desired contacts (good) or not (bad). We take a few sample GPs to construct the function; DSA simulations are performed for each GP to decide whether it is good or bad, and the decision is marked in n-dimensional space. The hyper-plane that separates good marks and bad marks in that space is determined through machine learning process, and corresponds to our decision function. We try a single global function that can be applied to any GP types, and a series of functions in which each function is customized for different GP type; they are then compared and assessed in 10nm technology.

  10. [Affine transformation-based automatic registration for peripheral digital subtraction angiography (DSA)].

    Science.gov (United States)

    Kong, Gang; Dai, Dao-Qing; Zou, Lu-Min

    2008-07-01

    In order to remove the artifacts of peripheral digital subtraction angiography (DSA), an affine transformation-based automatic image registration algorithm is introduced here. The whole process is described as follows: First, rectangle feature templates are constructed with their centers of the extracted Harris corners in the mask, and motion vectors of the central feature points are estimated using template matching technology with the similarity measure of maximum histogram energy. And then the optimal parameters of the affine transformation are calculated with the matrix singular value decomposition (SVD) method. Finally, bilinear intensity interpolation is taken to the mask according to the specific affine transformation. More than 30 peripheral DSA registrations are performed with the presented algorithm, and as the result, moving artifacts of the images are removed with sub-pixel precision, and the time consumption is less enough to satisfy the clinical requirements. Experimental results show the efficiency and robustness of the algorithm.

  11. Intravenous digital subtraction angiography of the lower limbs combined with field movement (2-field DSA)

    International Nuclear Information System (INIS)

    Fritschy, P.; Terrier, F.

    1988-01-01

    We evaluated a bolus-chase technique designed to reduce the volume of contrast material and to shorten examination time during intravenous digital subtraction angiography (IV-DSA) of the lower limbs. With this technique, after a single injection of contrast material, two contiguous fields can be sequentially imaged (two-field DAS) using a step translated X-ray tube. 67 patients with peripheral vascular disease were studied. All examinations provided diagnostic information, so that in no instance additional intra-arterial injections were required. With the two-field DSA only 3.49 injections were needed in the average for five fields examined in each patient, resulting in a 30% reduction of contrast agent used. (orig.) [de

  12. Synergistic effect of DSA and MSCTA in interventional therapy for lung cancer

    International Nuclear Information System (INIS)

    Peng Liaohe; Xiao Xiangsheng; Jia Ningyang; Dong Sheng; Dong Weihua

    2009-01-01

    Objective: To evaluate the synergistic effect of DSA and MSCTA in interventional therapy for lung cancer. Methods Interventional therapy was performed in 46 patients with lung cancer. With real time helical thin slice CT scanning, MSCTA of tumor feeding artery was performed in 26 patients. Images obtained from enhanced MSCT scanning were processed at the console workstation. Spatial anatomical characteristics of tumor feeding artery were observed by using different rotations of view. DSA study and the interventional therapy were followed up in 26 patients with lung cancer. Results: All tumor feeding arteries in 26 patients with lung cancer were observed by using VR, MIP and MPR, which could exactly display the origin, course and diameter of the vessels. DSA had a high consistency with MSCTA in displaying the tumor vascularity, tumor stain, and the origin of tumor-feeding artery in the patients who received MSCTA and the interventional therapy. The number of catheter used, the dosage of contrast medium, the sequence of subtraction, the fluoroscopic time and operation time in the group with use of CTA was less than that in the group without use of CTA, and the difference between two groups was statistically significant (P 0.05). Conclusion: The anatomical characteristics of tumor-feeding artery in patients with lung cancer can be stereoscopically and clearly displayed on preoperative routine MSCTA, providing useful information and thus making the interventional procedure more safe and effective. Simultaneous use of DSA and MSCTA is reasonable and practicable, which has synergistic effect in interventional therapy for lung cancer. (authors)

  13. Detection and characterization of unruptured intracranial aneurysms: Comparison of 3T MRA and DSA.

    Science.gov (United States)

    Mine, Benjamin; Pezzullo, Martina; Roque, Gonçalo; David, Philippe; Metens, Thierry; Lubicz, Boris

    2015-06-01

    To compare magnetic resonance angiography (MRA) at 3 Tesla (3T) and digital subtraction angiography (DSA) for the detection and characterization of unruptured intracranial aneurysms (UIA). This study has been approved by our local ethical committee. From February to August 2010, 40 consecutive patients with UIA contemporarily underwent MRA at 3T including time-of-flight (TOF-MRA) and contrast enhanced (CE-MRA) techniques and DSA. MR images were independently reviewed by 3 radiologists and DSA images were reviewed by 2 radiologists together. Interobserver and intertechnique agreements were assessed for aneurysm detection and characterization including maximal diameter, neck width and the presence of a bleb or a branch arising from the sac. DS angiography revealed 56 aneurysms. Mean sensitivity and positive predictive value of MRA were 91.4% and 93.4% respectively. For UIA < 3 mm and those ≥ 3 mm, MRA had a mean sensitivity of 74.1% and 100% respectively. Intertechnique and interobserver agreements were substantial for the measurement of UIA maximal diameter (mean κ, 0.607 and 0.601 respectively) and were moderate and fair for neck width measurement respectively (mean κ, 0.456 and 0.285 respectively). For bleb detection, intertechnique and interobserver agreements were fair and slight respectively (mean κ, 0.312 and 0.116 respectively) whereas both were slight for detection of branches arising from the sac (mean κ, 0.151 and 0.070 respectively). MR angiography at 3T has a high sensitivity for the detection of UIA. However, it remains significantly inferior to DSA for morphological characterization of UIA. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  14. The use of eDR-71xx for DSA defect review and automated classification

    Science.gov (United States)

    Pathangi, Hari; Van Den Heuvel, Dieter; Bayana, Hareen; Bouckou, Loemba; Brown, Jim; Parisi, Paolo; Gosain, Rohan

    2015-03-01

    The Liu-Nealey (LiNe) chemo-epitaxy Directed Self Assembly flow has been screened thoroughly in the past years in terms of defects. Various types of DSA specific defects have been identified and best known methods have been developed to be able to get sufficient S/N for defect inspection to help understand the root causes for the various defect types and to reduce the defect levels to prepare the process for high volume manufacturing. Within this process development, SEM-review and defect classification play a key role. This paper provides an overview of the challenges that DSA brings also in this metrology aspect and we will provide successful solutions in terms of making the automated defect review. In addition, a new Real Time Automated Defect Classification (RT-ADC) will be introduced that can save up to 90% in the time required for manual defect classification. This will enable a much larger sampling for defect review, resulting in a better understanding of signatures and behaviors of various DSA specific defect types, such as dislocations, 1-period bridges and line wiggling.

  15. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The US Department of Energy is currently constructing the Waste Isolation Pilot near Carlsbad, New Mexico. The full-scale pilot plant will demonstrate the feasibility of the safe disposal of defense-related nuclear waste in a bedded salt formation at a depth of 2160 feet below the surface. WIPP will provide for the permanent storage of 25,000 cu ft of remote-handled (RH) transuranic waste and 6,000,000 cu ft of contact-handled (CH) transuranic waste. This paper covers the major mechanical/structural design considerations for the waste hoist and its hoist tower structure. The design of the hoist system and safety features incorporates state-of-the-art technology developed in the hoist and mining industry to ensure safe operation for transporting nuclear waste underground. Also included are design specifications for VOC-10 monitoring system.

  16. HANFORD SITE RIVER PROTECTION PROJECT (RPP) TRANSURANIC (TRU) TANK WASTE IDENTIFICATION and PLANNING FOR REVRIEVAL TREATMENT and EVENTUAL DISPOSAL AT WIPP

    International Nuclear Information System (INIS)

    KRISTOFZSKI, J.G.; TEDESCHI, R.; JOHNSON, M.E.; JENNINGS, M

    2006-01-01

    The CH2M HILL Manford Group, Inc. (CHG) conducts business to achieve the goals of the Office of River Protection (ORP) at Hanford. As an employee owned company, CHG employees have a strong motivation to develop innovative solutions to enhance project and company performance while ensuring protection of human health and the environment. CHG is responsible to manage and perform work required to safely store, enhance readiness for waste feed delivery, and prepare for treated waste receipts for the approximately 53 million gallons of legacy mixed radioactive waste currently at the Hanford Site tank farms. Safety and environmental awareness is integrated into all activities and work is accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public. This paper focuses on the innovative strategy to identify, retrieve, treat, and dispose of Hanford Transuranic (TRU) tank waste at the Waste Isolation Pilot Plant (WIPP)

  17. Analysis of Waste Isolation Pilot Plan (WIPP) Underground and MGO Samples by the Savannah River National Laboratory (SRNL)

    Energy Technology Data Exchange (ETDEWEB)

    Young, J. [Savannah River Site (SRS), Aiken, SC (United States); Ajo, H. [Savannah River Site (SRS), Aiken, SC (United States); Brown, L. [Savannah River Site (SRS), Aiken, SC (United States); Coleman, C. [Savannah River Site (SRS), Aiken, SC (United States); Crump, S. [Savannah River Site (SRS), Aiken, SC (United States); Diprete, C. [Savannah River Site (SRS), Aiken, SC (United States); Diprete, D. [Savannah River Site (SRS), Aiken, SC (United States); Ekechukwu, A. [Savannah River Site (SRS), Aiken, SC (United States); Gregory, C. [Savannah River Site (SRS), Aiken, SC (United States); Jones, M. [Savannah River Site (SRS), Aiken, SC (United States); Missimer, D. [Savannah River Site (SRS), Aiken, SC (United States); O' Rourke, P. [Savannah River Site (SRS), Aiken, SC (United States); White, T. [Savannah River Site (SRS), Aiken, SC (United States)

    2014-12-31

    Analysis of the recent WIPP samples are summarized in this report; WIPP Cam Filters 4, 6, 9 (3, 7, 11 were analyzed with FAS-118 in a separate campaign); WIPP Drum Lip R16 C4; WIPP Standard Waste Box R15 C5; WIPP MgO R16 C2; WIPP MgO R16 C4; WIPP MgO R16 C6; LANL swipes of parent drum; LANL parent drum debris; LANL parent drum; IAEA Swipe; Unused “undeployed” Swheat; Unused “undeployed” MgO; and Masselin cloth “smears”. Analysis showed that the MgO samples were very pure with low carbonate and water content. Other samples showed the expected dominant presence of Mg, Na and Pb. Parent drum debris sample was mildly acidic. Interpretation of results is not provided in this document, but rather to present and preserve the analytical work that was performed. The WIPP Technical Analysis Team is responsible for result interpretation which will be written separately.

  18. Cookoff Modeling of a WIPP waste drum (68660)

    Energy Technology Data Exchange (ETDEWEB)

    Hobbs, Michael L. [Sandia National Laboratories, Albuquerque, NM (United States)

    2014-11-24

    A waste drum located 2150 feet underground may have been the root cause of a radiation leak on February 14, 2014. Information provided to the WIPP Technical Assessment Team (TAT) was used to describe the approximate content of the drum, which included an organic cat litter (Swheat Scoop®, or Swheat) composed of 100% wheat products. The drum also contained various nitrate salts, oxalic acid, and a nitric acid solution that was neutralized with triethanolamine (TEA). CTH-TIGER was used with the approximate drum contents to specify the products for an exothermic reaction for the drum. If an inorganic adsorbent such as zeolite had been used in lieu of the kitty litter, the overall reaction would have been endothermic. Dilution with a zeolite adsorbent might be a useful method to remediate drums containing organic kitty litter. SIERRA THERMAL was used to calculate the pressurization and ignition of the drum. A baseline simulation of drum 68660 was performed by assuming a background heat source of 0.5-10 W of unknown origin. The 0.5 W source could be representative of heat generated by radioactive decay. The drum ignited after about 70 days. Gas generation at ignition was predicted to be 300-500 psig with a sealed drum (no vent). At ignition, the wall temperature increases modestly by about 1°C, demonstrating that heating would not be apparent prior to ignition. The ignition location was predicted to be about 0.43 meters above the bottom center portion of the drum. At ignition only 3-5 kg (out of 71.6 kg total) has been converted into gas, indicating that most of the material remained available for post-ignition reaction.

  19. An evaluation of the proposed tests with radioactive waste at WIPP

    International Nuclear Information System (INIS)

    Chaturvedi, L.; Silva, M.

    1992-01-01

    This paper discusses the Waste Isolation Pilot Plant (WIPP) a planned repository for permanent disposal of transuranic (TRU) radiative waste that has resulted from the defense activities of the U.S. Government over the past 50 years. Only the waste that is currently stored in an easily retrievable mode at ten U.S. Department of Energy (DOE) laboratories around the country will be shipped to WIPP. The waste consists of various kinds of trash including paper, rubber, rags and metal that is contaminated with radionuclides with very long half-lives. The decision to dispose of the waste permanently will be made based on projections of the behavior of the waste and the repository of 10,000 years or more. DOE has proposed shipping a limited amount of waste to WIPP for a five year Test Phase to demonstrating compliance with the U.S. Environmental Protection Agency (EPA) Standard for long-term isolation

  20. Modification of the ventilation system at Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Sethi, S.C.

    1987-01-01

    The WIPP (Waste Isolation Pilot Plant) Project near Carlsbad, New Mexico, is a research and development project sponsored by the US Department of Energy, designed to demonstrate the safe disposal of radioactive waste. A mine (repository) is being developed 2,150 feet below the surface in a thick salt bed, which will serve as the disposal medium. The underground ventilation system for the WIPP project was originally designed based on a fixed project scope. The design criteria and ventilation requirements were developed for the performance of various activities as then envisioned towards the achievement of this goal. However, in light of new information and actual site-specific experience at WIPP leading to a clearer definition of the scope-related programs and activities, it was realized that the existing ventilation system may need to be modified

  1. Rationale for the H-19 and H-11 tracer tests at the WIPP site

    International Nuclear Information System (INIS)

    Beauheim, R.L.; Meigs, L.C.; Davies, P.B.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) is a repository for transuranic wastes constructed in bedded Permian-age halite in the Delaware Basin, a sedimentary basin in southeastern New Mexico, USA. A drilling scenario has been identified during performance assessment (PA) that could lead to the release of radionuclides to the Culebra Dolomite Member of the Rustler Formation, the most transmissive water-saturated unit above the repository horizon. Were this to occur, the radionuclides would need to be largely contained within the Culebra (or neighboring strata) within the WIPP-site boundary through the period lasting for 10,000 years after repository closure for WIPP to remain in compliance with applicable regulations on allowable releases. Thus, processes affecting transport of radionuclides within the Culebra are of importance to PA

  2. Salt impact studies at WIPP effects of surface storage of salt on microbial activity

    International Nuclear Information System (INIS)

    Rodriguez, A.L.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) currently under construction in southeastern New Mexico is a research and development facility to demonstrate the safe disposal of transuranic waste in a deep geological formation (bedded salt). The Ecological Monitoring Program at WIPP is designed to detect and measure changes in the local ecosystem which may be the result of WIPP construction activities. The primary factor which may affect the system prior to waste emplacement is windblown salt from discrete stockpiles. Both vegetation and soil microbial processes should reflect changes in soil chemistry due to salt importation. Control and experimental (potentially affected) plots have been established at the site, and several parameters are measured quarterly in each plot as part of the soil microbial sampling subprogram. This subprogram was designed to monitor a portion of the biological community which can be affected by changes in the chemical properties at the soil surface

  3. Assessment of near-surface dissolution at and near the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    International Nuclear Information System (INIS)

    Bachman, G.O.

    1985-07-01

    The area at and near the WIPP site was examined for evidence of karst development on the geomorphic surface encompassing the site. Certain surficial depressions of initial concern were identified as blowouts in sand dune fields (shallow features unrelated to karstification). An ancient stream system active more than 500,000 yr ago contained more water than any system since. During that time (Gatuna, Middle Pleistocene), many karst features such as Clayton Basin and Nash Draw began to form in the region. Halite was probably dissolved from parts of the Rustler Formation at that time. Dissolution of halite and gypsum from intervals encountered in Borehole WIPP-33 west of the WIPP site occurred during later Pleistocene time (i.e., <450,000 yr ago). However, there is no evidence of active near-surface dissolution within a belt to the east of WIPP-33 in the vicinity of the WIPP shaft. 26 refs., 11 figs., 1 tab

  4. Assessment of near-surface dissolution at and near the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Bachman, G.O.

    1985-07-01

    The area at and near the WIPP site was examined for evidence of karst development on the geomorphic surface encompassing the site. Certain surficial depressions of initial concern were identified as blowouts in sand dune fields (shallow features unrelated to karstification). An ancient stream system active more than 500,000 yr ago contained more water than any system since. During that time (Gatuna, Middle Pleistocene), many karst features such as Clayton Basin and Nash Draw began to form in the region. Halite was probably dissolved from parts of the Rustler Formation at that time. Dissolution of halite and gypsum from intervals encountered in Borehole WIPP-33 west of the WIPP site occurred during later Pleistocene time (i.e., <450,000 yr ago). However, there is no evidence of active near-surface dissolution within a belt to the east of WIPP-33 in the vicinity of the WIPP shaft. 26 refs., 11 figs., 1 tab.

  5. Hanford to WIPP - What a Trip: The Road from Hanford is now Open

    International Nuclear Information System (INIS)

    FRENCH, M.S.

    2001-01-01

    The road leading from Hanford's Waste Receiving and Processing (WRAP) Facility to the Waste Isolation Pilot Plant (WJPP) in New Mexico developed a few bumps and detours over the past year, but it has now been successfully traversed. There were challenges obtaining Carlsbad Area Office and New Mexico Department of Ecology certification of the Hanford characterization program. After months of work, when initial certification appeared imminent, the issuance of the WIPP Hazardous Waste Permit changed the Waste Analysis Plan (WAP) required for characterizing waste for acceptance at WIPP. After a ceremony dedicating the ''Washington'' room at WIPP, the inaugural shipment from WRAP to WIPP was scheduled for June 2000. This first shipment was planned based on shipping a number of containers that had been characterized before the issuance of the WIPP Mixed Waste Permit. However, the New Mexico Department of Ecology initially declined to accept the characterization data generated before the permit was issued, necessitating revision to the planned shipment. Because of the difficulties inherent in scheduling the TRUPACT-II transport and coordination with all of the states through which the shipment would pass, it was decided to proceed with the first shipment in early July with only the drums that had been characterized after Hanford compliance with the new WIPP WAP requirements had been certified. Following the initial shipment, previously certified containers were recertified using a process approved through negotiation with the New Mexico Environment Department, and additional full shipments have been successfully completed. This paper will present an overview of the challenges overcome and lessons learned in obtaining certification, coordination with the involved states, and eventual successful1 implementation of a routine shipping program

  6. WIPP conceptual design report. Addendum F. HVAC systems energy analysis for Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1977-04-01

    This report presents the results of a technical and economic analysis of alternative methods of meeting the heating, ventilating, and air conditioning requirements of the Waste Isolation Pilot Plant (WIPP) facilities proposed to be constructed in southeastern New Mexico. This report analyzes a total of ten WIPP structures to determine the most energy and economic efficient means of providing heating, ventilating, and air conditioning services. Additional analyses were performed to determine the merits of centralized versus dispersed refrigeration and heating facilities, and of performing supplemental domestic hot water heating with solar panels

  7. WIPP Regulatory Compliance Strategy and Management Plan for demonstrating compliance to long-term disposal standards

    International Nuclear Information System (INIS)

    1994-05-01

    The primary purpose of this document is to provide a strategy by which the WIPP will demonstrate its ability to perform as a deep geologic repository. The document communicates the DOE's understanding of the regulations related to long-term repository performance; and provides the most efficient strategy that intergrates WIPP Project elements, ensures the sufficiency of information, and provides flexibility for changes in the TRU waste generation system to facilitate the disposal of defense-generated TRU wastes. In addition, this document forms a focal point between the DOE and its various external regulators as well as other stakeholders for the purpose of arriving at compliance decisions that consider all relevant input

  8. Kadurumba, CH

    African Journals Online (AJOL)

    Kadurumba, CH. Vol 33, No 3 (2014) - Research papers. Kinematics and Dynamic Evaluation of the Screw Conveyor of a Cassava Centrifuge Dewatering Machine Abstract PDF · Vol 33, No 3 (2014) - Research papers. Performance Optimization of a Cassava Pelleting Machine Abstract PDF. ISSN: 2467-8821. AJOL African ...

  9. Experiences from the LNPP-P and DSA review. Lessons learned from RBMK safety studies

    International Nuclear Information System (INIS)

    Mankamo, T.; Marttila, J.; Reponen, H.

    2000-09-01

    RBMK is the Russian acronym for 'Channelized Large Power Reactor'. The Soviet-designed RBMK plants deviate substantially from typical Western BWR or PWR plants. The safety of the RBMK plants has raised severe concerns since the major accident at Chernobyl Unit 4 in 1986. In addition, a fire destroyed the turbine hall of Chernobyl Unit 2 in 1991 resulting in a near-accident: the reactor cooling could only be maintained through improvised measures. Another well-known fire event is the control cable room fire at Ignalina Unit 2 in 1989, which led to a partial loss of the main control room functions. After the collapse of Soviet Union several multilateral safety programs were started to evaluate and improve the safety of the RBMK plants. A Probabilistic and Deterministic Safety Assessment (P and DSA) of the Leningrad Nuclear Power Plant (LNPP) Unit 2 was started in 1996. Phase 2 of the project was completed in January 1999. A Peer Review was performed by Russian and Western experts. This report describes the insights from the RBMK risk studies, especially from the LNPP P and DSA with emphasis on the deeper understanding of the risk-important design factors and identification of possible ways to increase safety. LNPP P and DSA has meant a significant progress in this respect. Despite of its certain limitations P and DSA Phase 2 could point out short-term measures, which substantially reduced the risk of identified weaknesses, mostly related to the reliability of the emergency feedwater function and its support systems. The findings of LNPP P and DSA and the review recommendations emphasise the extensions needed to the analysis scope. The spreading and other influences of fires and floods between connected spaces should be analysed because of incomplete separation and protection in these regards in the 16st generation RBMK plants. High priority should be given to the analysis of external hazards, which were found important at the Loviisa NPP on the Northern side of the

  10. Experiences from the LNPP-P and DSA review. Lessons learned from RBMK safety studies

    Energy Technology Data Exchange (ETDEWEB)

    Mankamo, T. [Avaplan Oy (Finland); Marttila, J.; Reponen, H. [Radiation and Nuclear Safety Authority, Helsinki (Finland)

    2000-09-01

    RBMK is the Russian acronym for 'Channelized Large Power Reactor'. The Soviet-designed RBMK plants deviate substantially from typical Western BWR or PWR plants. The safety of the RBMK plants has raised severe concerns since the major accident at Chernobyl Unit 4 in 1986. In addition, a fire destroyed the turbine hall of Chernobyl Unit 2 in 1991 resulting in a near-accident: the reactor cooling could only be maintained through improvised measures. Another well-known fire event is the control cable room fire at Ignalina Unit 2 in 1989, which led to a partial loss of the main control room functions. After the collapse of Soviet Union several multilateral safety programs were started to evaluate and improve the safety of the RBMK plants. A Probabilistic and Deterministic Safety Assessment (P and DSA) of the Leningrad Nuclear Power Plant (LNPP) Unit 2 was started in 1996. Phase 2 of the project was completed in January 1999. A Peer Review was performed by Russian and Western experts. This report describes the insights from the RBMK risk studies, especially from the LNPP P and DSA with emphasis on the deeper understanding of the risk-important design factors and identification of possible ways to increase safety. LNPP P and DSA has meant a significant progress in this respect. Despite of its certain limitations P and DSA Phase 2 could point out short-term measures, which substantially reduced the risk of identified weaknesses, mostly related to the reliability of the emergency feedwater function and its support systems. The findings of LNPP P and DSA and the review recommendations emphasise the extensions needed to the analysis scope. The spreading and other influences of fires and floods between connected spaces should be analysed because of incomplete separation and protection in these regards in the 16st generation RBMK plants. High priority should be given to the analysis of external hazards, which were found important at the Loviisa NPP on the Northern

  11. Assessment of Contaminated Brine Fate and Transport in MB139 at WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Kuhlman, Kristopher L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Applied Systems Analysis and Research Dept.; Malama, Bwalya [Sandia National Lab., Carlsbad, NM (United States). Performance Assessment Dept.

    2014-07-01

    Following the radionuclide release event of February 14, 2014 at the Waste Isolation Pilot Plant (WIPP), actinide contamination has been found on the walls and floor in Panel 7 as a result of a release in Room 7 of Panel 7. It has been proposed to decontaminate Panel 7 at the WIPP by washing contaminated surfaces in the underground with fresh water. A cost-effective cleanup of this contamination would allow for a timely return to waste disposal operations at WIPP. It is expected that the fresh water used to decontaminate Panel 7 will flow as contaminated brine down into the porosity of the materials under the floor – the run-of-mine (ROM) salt above Marker Bed 139 (MB139) and MB139 itself – where its fate will be controlled by the hydraulic and transport properties of MB139. Due to the structural dip of MB139, it is unlikely that this brine would migrate northward towards the Waste-Handling Shaft sump. A few strategically placed shallow small-diameter observation boreholes straddling MB139 would allow for monitoring the flow and fate of this brine after decontamination. Additionally, given that flow through the compacted ROM salt floor and in MB139 would occur under unsaturated (or two-phase) conditions, there is a need to measure the unsaturated flow properties of crushed WIPP salt and salt from the disturbed rock zone (DRZ).

  12. Effects of microbial processes on gas generation under expected WIPP repository conditions: Annual report through 1992

    Energy Technology Data Exchange (ETDEWEB)

    Francis, A.J.; Gillow, J.B.

    1993-09-01

    Microbial processes involved in gas generation from degradation of the organic constituents of transuranic waste under conditions expected at the Waste Isolation Pilot Plant (WIPP) repository are being investigated at Brookhaven National Laboratory. These laboratory studies are part of the Sandia National Laboratories -- WIPP Gas Generation Program. Gas generation due to microbial degradation of representative cellulosic waste was investigated in short-term (< 6 months) and long-term (> 6 months) experiments by incubating representative paper (filter paper, paper towels, and tissue) in WIPP brine under initially aerobic (air) and anaerobic (nitrogen) conditions. Samples from the WIPP surficial environment and underground workings harbor gas-producing halophilic microorganisms, the activities of which were studied in short-term experiments. The microorganisms metabolized a variety of organic compounds including cellulose under aerobic, anaerobic, and denitrifying conditions. In long-term experiments, the effects of added nutrients (trace amounts of ammonium nitrate, phosphate, and yeast extract), no nutrients, and nutrients plus excess nitrate on gas production from cellulose degradation.

  13. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  14. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  15. EVALUATION OF RISKS AND WASTE CHARACTERIZATION REQUIREMENTS FOR THE TRANSURANIC WASTE EMPLACED IN WIPP DURING 1999

    Energy Technology Data Exchange (ETDEWEB)

    Channell, J.K.; Walker, B.A.

    2000-05-01

    Specifically this report: 1. Compares requirements of the WAP that are pertinent from a technical viewpoint with the WIPP pre-Permit waste characterization program, 2. Presents the results of a risk analysis of the currently emplaced wastes. Expected and bounding risks from routine operations and possible accidents are evaluated; and 3. Provides conclusions and recommendations.

  16. Seismic reflection data report: Waste Isolation Pilot Plant (WIPP) site, Southeastern New Mexico

    International Nuclear Information System (INIS)

    Hern, J.L.; Powers, D.W.; Barrows, L.J.

    1978-12-01

    Three seismic reflection (Vibroseis) surveys conducted from 1976 through 1978 by Sandia Laboratories to support investigations for the Waste Isolation Pilot Plant (WIPP) are described. Volume I describes the purpose, field parameters, and data processing parameters. Volume II contains uninterpreted processed lines and shotpoint maps. Data interpretations will be the subject of the subsequent reports. The data collected during these three surveys total 77 line miles; 72 line miles of this are on or very near the WIPP site. The first of the surveys (1976 SAN) covered 25 line miles and was conducted similarly to previous petroleum industry surveys in the area. 1976 SAN supplemented existing petroleum industry data. The two subsequent surveys (1977 X and 1978 Y) used shorter geophone spacings (110'), higher signal frequencies (up to 100 Hz), and higher data sampling rates (2 ms.) to better define the shallow zone (less than 4000') of primary interest. 1977 X contained 47 line miles on or near the WIPP site and over several structural features northwest of the site. 1978 Y contains 5 line miles over a one square mile area near the center of the WIPP site. These data show increasing discrimination of shallow reflectors as data collection parameters were modified. Data tables of recording and processing parameters are included. A fourth Vibroseis survey was conducted at the WIPP site in 1978 by Grant Geophysical Company for Bechtel; the data are not in final form and are not included. Petroleum industry data and an inconclusive weight-drop survey, conducted in 1976, are also not included in this report

  17. Gadofosveset-enhanced MR angiography of the pedal arteries in patients with diabetes mellitus and comparison with selective intraarterial DSA

    Energy Technology Data Exchange (ETDEWEB)

    Roehrl, Boris; Kunz, Rainer Peter; Oberholzer, Katja; Pitton, Michael Bernhard; Dueber, Christoph; Kreitner, Karl-Friedrich [Johannes Gutenberg University Mainz, Department of Diagnostic and Interventional Radiology, Mainz (Germany); Neufang, Achim [Johannes Gutenberg University Mainz, Department of Cardiothoracic and Vascular Surgery, Mainz (Germany)

    2009-12-15

    To compare gadofosveset-enhanced magnetic resonance angiography (MRA) of the pedal vasculature with selective intraarterial DSA. Eighteen patients with PAOD and type II diabetes were prospectively examined at 1.5 T. For contrast enhancement, 0.03 mmol/kg body weight gadofosveset was used. MR imaging consisted of dynamic and of high-resolution steady-state imaging. Selective digital subtraction angiography (DSA) was performed within 5 days and served as standard of reference. Image analysis was done by two observers. There were no differences between MRA and DSA regarding overall image quality. First-pass MRA detected significantly more patent vessel segments than did DSA (P < 0.001, kappa = 0.46). Interobserver agreement of MRA was very good with respect to the detection of patent vessel segments and the assessment of hemodynamically relevant stenoses (kappa = 0.97 and 0.89, respectively). Steady-state imaging depicted significantly more patent metatarsal arteries than did dynamic imaging, and delineated inflammatory complications including osteomyelitis, soft-tissue abscesses, and fistulas related to the diabetic foot. Gadofosveset-enhanced MRA of the pedal vasculature proved to be superior to DSA. It offered a long imaging time window, and allowed for better depiction of the pedal outflow. Steady-state imaging delineated inflammatory complications associated with the diabetic foot. (orig.)

  18. Intravenous spiral CT angiography for assessment before orthotopic liver transplantation: Comparison between tomography, MIP, 3-dimensional surface imaging and intraarterial DSA; Intravenoese Spiral-CT-Angiographie zur Evaluation vor orthotoper Lebertransplantation: Vergleiche zwischen Schnittbilddarstellung, MIP, dreidimensionaler Oberflaechendarstellung und intraarterieller DSA

    Energy Technology Data Exchange (ETDEWEB)

    Hidajat, N. [Medizinische Fakultaet der Humboldt-Univ., Berlin (Germany). Strahlenklinik und Poliklinik; Vogl, T.J. [Medizinische Fakultaet der Humboldt-Univ., Berlin (Germany). Strahlenklinik und Poliklinik; Moeller, M. [Medizinische Fakultaet der Humboldt-Univ., Berlin (Germany). Strahlenklinik und Poliklinik; Bechstein, W.O. [Medizinische Fakultaet der Humboldt-Univ., Berlin (Germany). Klinik und Poliklinik fuer Allgemein- und Transplantationschirurgie; Felix, R. [Medizinische Fakultaet der Humboldt-Univ., Berlin (Germany). Strahlenklinik und Poliklinik

    1996-11-01

    Purpose: To analyse the efficacy of intravenous spiral CT angiography (SCTA) for the evaluation before orthotopic liver transplantation (oLT) compared with DSA. Methods: Spiral CT was performed on 31 potential recipients of a liver graft in order to examine hepatic vessels, coeliac axis, splenic artery and superior mesenteric artery. The arterial vessels were reconstructed in `Maximum Intensity Projection (MIP)` and `Shaded Surface Display (SSD)`-technique. The axial images, MIP and SSD were compared in 25 patients with DSA with regard to the visualisation of the vascular anatomy, detectability of stenosis and vascular diameters. Results: The type of arterial liver supply could be determined via SCTA in all patients. Stenosis of the coeliac axis was seen in ten patients on the DSA, MIP and SSD and in eight patients on the axial images. Occlusion of the hepatic artery was clearly visualised in two patients on the DSA, axial images and MIP and in one patient on the SSD. There was no false positive diagnosis with SCTA. SSD was seen as the best technique to visualise the vessels without overshadowing. There were no significant differences between the diamters measured from the axial images, MIP and SSD images in transversal direction and the DSA images (p>0.05). Conclusion: SCTA is a greatly promising method for the imaging of vessels supplying the liver before oLT, and may convey more diagnostic information than DSA. (orig.) [Deutsch] Ziel: Bewertung der Einsetzbarkeit in intravenoesen Spiral-CT-Angiographie (SCTA) zur Evaluation vor orthotoper Lebertransplantation (oLT) im Vergleich zur DSA. Methoden: Es wurde bei 31 Patienten vor moeglicher oLT eine SCTA der Lebergefaesse einschliesslich des Truncus coeliacus, der A. lienalis und A. mesenterica superior durchgefuehrt. Die arteriellen Gefaesse wurden mittels `Maximum-Intensitaets-Projektion (MIP)`- und `Oberflaechenschattierungs(SSD)`-Technik rekonstruiert. Die Schnittbilder, MIP und SSD, wurden bei 25 Patienten

  19. New screening system for unruptured cerebral aneurysms; Combination of an expert system and DSA examination

    Energy Technology Data Exchange (ETDEWEB)

    Samejima, Hirotsugu; Ushikubo, Yukio; Mizokami, Toru (Toho Univ., Tokyo (Japan). School of Medicine) (and others)

    1990-08-01

    We have designed a screening system to diagnose unruptured aneurysms, including the use of digital subtraction angiography (DSA). We surveyed 115 patients who had undergone clipping procedures after subarachnoid hemorrhage (SAH) and questioned them with regard to the subjective symptoms. Sixty-eight of 92 patients who returned the questionnaire reported, prior to rupture, headache,eye pain, and neck pain most frequently, and also impairment of extraocular movements, ptosis, visual field defects, and motor and sensory disturbances. Nineteen (47.5%) of 40 patients who had complete pain relief after surgery complained of headache from 1 week to 1 month before SAH. In addition, nine patients (22.5%) complained of headache for several years, and were also pain-free after surgery. For the indication of DSA, we employed an expert system based on fuzzy set theory. Seven groups of parameters are: Group 1, a basic questionnaire concerning age, sex, and past and family histories; Group 2, 15 warning signs selected on the basis of retrospective study; and Groups 3-7, detailed questions concerning each sign. Scoring weights assigned to each condition based on the results of the retrospective study, and threshold values were determined by several neurosurgeons. The certainty factors for intermediate hypotheses were calculated from these weights and threshold values and summed up, from which the conclusion was obtained. Twelve new cases of unruptured cerebral aneurysm were diagnosed using this screening system. This system may improve the ability to diagnose cerebral aneurysms before rupture. (author).

  20. L’ICF-CY per la progettazione inclusiva per gli alunni con DSA

    Directory of Open Access Journals (Sweden)

    Marina Chiaro

    2013-09-01

    Full Text Available Il lavoro presenta i principali risultati di una ricerca a carattere teorico-esplorativo, finalizzata a valutare quanto lo strumento dell’International Classification of Functioning, Disability and Health for Children and Youth (ICF-CY sia conosciuto ed utilizzato nei diversi contesti educativi per l’osservazione degli allievi e del loro “funzionamento” in senso dinamico-evolutivo, in interazione con i fattori ambientali, e finalizzato ad una progettazione educativo-didattica significativamente orientata alla prospettiva inclusiva. A tal fine sono stati intervistati gli insegnanti delle scuole di ogni ordine e grado del Lazio iscritti al Master in Didattica e Psicopedagogia per gli alunni con Disturbi Specifici di Apprendimento (DSA presso l’Università degli Studi di Roma Tre. La scelta è coerente con la direttiva MIUR del 2012 dove viene considerato rilevante ai fini della individuazione dei Bisogni Educativi Speciali dell’alunno, ed in particolare degli allievi con DSA, l’apporto, anche sul piano culturale del modello diagnostico ICF-CY che considera la persona nella sua totalità, in una prospettiva bio-psico-sociale.

  1. WDS/DSA Certification - International collaboration for a trustworthy research data infrastructure

    Science.gov (United States)

    Mokrane, Mustapha; Hugo, Wim; Harrison, Sandy

    2016-04-01

    , German Institute for Standardization (DIN) standard 31644, Trustworthy Repositories Audit and Certification (TRAC) criteria and the International Organization for Standardization (ISO) standard 16363. In addition, the Data Seal of Approval (DSA) and WDS have set up core certification mechanisms for trusted digital repositories in 2009, which are increasingly recognized as de facto standards. While DSA emerged in Europe in the Humanities and Social Sciences, WDS started as an international initiative with historical roots in the Earth and Space Sciences. Their catalogues of requirements and review procedures are based on the same principles of openness, transparency. A unique feature of the DSA and WDS certification is that it strikes a balance between simplicity, robustness and the effort required to complete. A successful international cross-project collaboration was initiated between WDS and DSA under the umbrella of the Research Data Alliance (RDA), an international initiative started in 2013 to promote data interoperability which provided a useful and neutral forum. A joint working group was established in early 2014 to reconcile and simplify the array of certification options and improve and stimulate core certification for scientific data services. The outputs of this collaboration are a Catalogue of Common Requirements (https://goo.gl/LJZqDo) and a Catalogue of Common Procedures (https://goo.gl/vNR0q1) which will be implemented jointly by WDS and DSA.

  2. Comparison of CO2 DSA and conventional angiography using non-ionic contrast media in lower extremity angiography

    International Nuclear Information System (INIS)

    Kim, Jae Kyu; Park, Sung Jae; Koh, Seok Wan; Seo, Jeong Jin; Kang, Heoung Keun; Chung, Hyon De

    1994-01-01

    The purpose of this study is to compare CO 2 DSA and nonionic contrast media angiography in respect to the quality of the opacification of collaterals and incidence of side-effects in peripheral occlusive arterial disease. Sixteen patients who were suspected to have peripheral occlusive arterial disease were performed angiography with nonionic contrast media and CO 2 at the same location with the same catheter. The causes of the lesions were atherosclerosis(n=7) and Buerger's disease(n=9). CO 2 DSA was compared with nonionic contrast media angiography in respect to the quality of image in the diagnosis of the lesions, opacifications of collaterals and side-effects. In atherosclerosis; quality of the images of CO 2 DSA was same as that of nonionic contrast media angiography in 6 patients and was poor in 1 patient; opacifications of collaterals of CO 2 DSA were same as that of nonionic contrast media angiography in 5 patients and was poor in 2 patients. In Buerger's disease; quality of the images of CO 2 DSA was same as that of nonionic contrast media angiography in 2 patients and was poor in 7 patients; opacifications of collaterals of CO 2 DSA were same as that of nonionic contrast media angiography in 1 patient and was poor in 8 patients. Leg pain was the only side-effect after CO 2 injection occurring in 4 out of 16 patients. CO 2 could be used as safe contrast media in patient with risk factors for nonionic contrast media and for diagnosis of the atherosclerosis in lower extremity. For the procedures such as vascular intervention requiring large amount of contrast media CO 2 could effectively replace nonionic contrast media

  3. Assessment of the potential for karst in the Rustler Formation at the WIPP site.

    Energy Technology Data Exchange (ETDEWEB)

    Lorenz, John Clay

    2006-01-01

    This report is an independent assessment of the potential for karst dissolution in evaporitic strata of the Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site. Review of the available data suggests that the Rustler strata thicken and thin across the area in depositional patterns related to lateral variations in sedimentary accommodation space and normal facies changes. Most of the evidence that has been offered for the presence of karst in the subsurface has been used out of context, and the different pieces are not mutually supporting. Outside of Nash Draw, definitive evidence for the development of karst in the Rustler Formation near the WIPP site is limited to the horizon of the Magenta Member in drillhole WIPP-33. Most of the other evidence cited by the proponents of karst is more easily interpreted as primary sedimentary structures and the localized dissolution of evaporitic strata adjacent to the Magenta and Culebra water-bearing units. Some of the cited evidence is invalid, an inherited baggage from studies made prior to the widespread knowledge of modern evaporite depositional environments and prior to the existence of definitive exposures of the Rustler Formation in the WIPP shafts. Some of the evidence is spurious, has been taken out of context, or is misquoted. Lateral lithologic variations from halite to mudstone within the Rustler Formation under the WIPP site have been taken as evidence for the dissolution of halite such as that seen in Nash Draw, but are more rationally explained as sedimentary facies changes. Extrapolation of the known karst features in Nash Draw eastward to the WIPP site, where conditions are and have been significantly different for half a million years, is unwarranted. The volumes of insoluble material that would remain after dissolution of halite would be significantly less than the observed bed thicknesses, thus dissolution is an unlikely explanation for the lateral variations from halite to mudstone and siltstone

  4. Comparison between fast contrast-enhanced MR angiography and DSA in diagnosing spinal cord vascular malformations

    International Nuclear Information System (INIS)

    Wang Wu; Li Minghua; Fang Chun; Wang Jue; Xiao Yunfeng

    2007-01-01

    Objective: To evaluate the diagnostic and clinical value of fast contrast-enhanced MR angiography (CE-MRA) with elliptic centric phase-encoding in spinal cord vascular malformations. Methods Fast three-dimensional contrast-enhanced MR angiography with elliptic centric phase-encoding and superconducting 1.5T system was applied prospectively in twenty-five consecutive patients with clinically suspected of spinal cord vascular malformations. All cases were performed with selective spinal digital subtraction angiography, including 18 cases treated by surgery and 2 of them with embolization before surgery, MR angiography follow up were undertaken in ten patients after surgery. Comparing fast contrast-enhanced MR angiography with DSA in diagnosing spinal cord vascular malformations included the origin of feeding artery, the feeding artery, the fistula or the nidus, the draining vein, and the vessel image quality based on the gold standard of selective spinal digital subtraction angiography. Results: Surgically proven diseases included spinal arteriovenous malformations(3 cases), spinal cord perimedullary arteriovenous fistulas (5 cases), spinal dural arteriovenous fistulas (8 cases), paravertebral arteriovenous fistulas (1 case), and spontaneous spinal epidural hematomas (2 eases). Comparing with DSA, the accuracy of MR angiography in diagnosing spinal cord vascular malformations; and detecting the origin of the feeding artery, the feeding artery, the shunt or the nidus and the draining vein were 93.8%, 92%, 96.2%, 100% and 100%, respectively. Overall the degree vascular enhencement were judged to be similar(P>0.05), but the vessel continuity of MRA was inferior to DSA (P<0.05). However, 9 cases of MRA showed no abnormal vascular malformation coinciding with those of surgery. Posttreatment MR angiography did not depict any abnormal vessels again. Conclusions: Fast three-dimensional contrast-enhanced MR angiography with elliptic centric phase-encoding may provide

  5. Certifying the Waste Isolation Pilot Plant: Lessons Learned from the WIPP Experience

    International Nuclear Information System (INIS)

    Anderson, D.R.; Chu, Margaret S.Y.; Froehlich, Gary K.; Howard, Bryan A.; Howarth, Susan M.; Larson, Kurt W.; Pickering, Susan Y.; Swift, Peter N.

    1999-01-01

    In May 1998, the US Environmental Protection Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with applicable long-term regulations governing the permanent disposal of spent nuclear fuel, high-level, and transuranic radioactive wastes. The WIPP is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal requirements. The first disposal of TRU waste at WIPP occurred on March 26, 1999. Many of the lessons learned during the WIPP Project's transition from site characterization and experimental research to the preparation of a successful application may be of general interest to other repository programs. During a four-year period (1992 to 1996), the WIPP team [including the DOE Carlsbad Area Office (CAO), the science advisor to CAO, Sandia National Laboratories (SNL), and the management and operating contractor of the WIPP site, Westinghouse Electric Corporation (WID)] met its aggressive schedule for submitting the application without compromising the integrity of the scientific basis for the long-term safety of the repository. Strong leadership of the CAO-SNL-WID team was essential. Within SNL, a mature and robust performance assessment (PA) allowed prioritization of remaining scientific activities with respect to their impact on regulatory compliance. Early and frequent dialog with EPA staff expedited the review process after the application was submitted. Questions that faced SNL are familiar to geoscientists working in site evaluation projects. What data should be gathered during site characterization? How can we know when data are sufficient? How can we know when our understanding of the disposal system is sufficient to support our conceptual models? What constitutes adequate ''validation'' of conceptual models for processes that act over geologic time? How should we use peer review and expert judgment? Other

  6. Analysis report for WIPP colloid model constraints and performance assessment parameters

    Energy Technology Data Exchange (ETDEWEB)

    Mariner, Paul E.; Sassani, David Carl

    2014-03-01

    An analysis of the Waste Isolation Pilot Plant (WIPP) colloid model constraints and parameter values was performed. The focus of this work was primarily on intrinsic colloids, mineral fragment colloids, and humic substance colloids, with a lesser focus on microbial colloids. Comments by the US Environmental Protection Agency (EPA) concerning intrinsic Th(IV) colloids and Mg-Cl-OH mineral fragment colloids were addressed in detail, assumptions and data used to constrain colloid model calculations were evaluated, and inconsistencies between data and model parameter values were identified. This work resulted in a list of specific conclusions regarding model integrity, model conservatism, and opportunities for improvement related to each of the four colloid types included in the WIPP performance assessment.

  7. Joint state of Colorado-US Department of Energy WIPP Shipment Exercise Program: TRANSAX '90

    International Nuclear Information System (INIS)

    1990-01-01

    In July 1990, the United States Secretary of Energy requested the DOE conduct a transportation emergency exercise before the end of CY 1990. The tasking was subsequently directed to the Director of DOE's Office of Environmental Restoration and Waste Management (EM) to plan and conduct an exercise, based on a Waste Isolation Pilot Plant (WIPP) shipment scenario. The state of Colorado was asked to participate. Colorado, in turn, invited the DOE to integrate the exercise into its own series of WIPP-related tabletop and field exercises for which the state had already begun planning. The result was a joint USDOE/Colorado full-scale (orientation) exercise called Transportation Accident Exercise 1990 (TRANSAX '90). The state of Colorado's exercise program was a follow-on to previously conducted classroom training. The program would serve to identify and resolve outstanding issues concerning inspections of the WIPP shipment transporter as it entered and passed through the state on the designated Interstate 25 transportation corridor; criteria for movement under various adverse weather and road conditions; and emergency response to accidents occurring in an urban or rural environment. The USDOE designed its participation in the exercise program to test selected aspects of the DOE Emergency Management System relating to response to and management of DOE off-site transportation emergencies involving assistance to state and local emergency response personnel. While a number of issues remain under study for ultimate resolution, others have been resolved and will become the basis for emergency operations plans, SOPs, mutual aid agreements, and checklist upgrades. Concurrently, the concentrated efforts at local, state, and federal levels in dealing with WIPP- related activities during this exercise program development have given renewed impetus to all parties as the beginning of actual shipments draws nearer. Three tabletop scenarios are discussed in this report

  8. Summary of 1988 WIPP [Waste Isolation Pilot Plant] Facility horizon gas flow measurements

    International Nuclear Information System (INIS)

    Stormont, J.C.

    1990-11-01

    Numerous gas flow measurements have been made at the Waste Isolation Pilot Plant (WIPP) Facility horizon during 1988. All tests have been pressure decay or constant pressure tests from single boreholes drilled from the underground excavations. The test fluid has been nitrogen. The data have been interpreted as permeabilities and porosities by means of a transient numerical solution method. A closed-form steady-state approximation provides a reasonable order-of-magnitude permeability estimate. The effective resolution of the measurement system is less than 10 -20 m 2 . Results indicate that beyond 1 to 5 m from an excavation, the gas flow is very small and the corresponding permeability is below the system resolution. Within the first meter of an excavation, the interpreted permeabilities can be 5 orders of magnitude greater than the undisturbed or far-field permeability. The interpreted permeabilities in the region between the undisturbed region and the first meter from an excavation are in the range of 10 -16 to 10 -20 m 2 . Measurable gas flow occurs to a greater depth into the roof above WIPP excavations of different sizes and ages than into the ribs and floor. The gas flows into the formation surrounding the smallest excavation tested are consistently lower than those at similar locations surrounding larger excavations of comparable age. Gas flow measured in the interbed layers near the WIPP excavations is highly variable. Generally, immediately above and below excavations, relatively large gas flow is measured in the interbed layers. These results are consistent with previous measurements and indicate a limited disturbed zone surrounding WIPP excavations. 31 refs., 99 figs., 5 tabs

  9. Supplements to the release scenario analyses for the waste isolation pilot plant (WIPP)

    International Nuclear Information System (INIS)

    Bingham, F.W.; Merritt, M.L.; Tierney, M.S.

    1980-01-01

    This paper summarizes three analyses of long-term environmental impacts of the WIPP that were made subsequent to the publication of the DEIS in response to agency and public comments. Three supplemental scenarios are described in which activity is transported to the biosphere by groundwater. The scenarios are entitled: brine pocket rupture scenario, effects of water on domestic wells; and agricultural use of the Pecos River Water

  10. The MR imaging and DSA features and embolization therapy of spinal dural arteriovenous fistulae

    International Nuclear Information System (INIS)

    Zhang Hua; Hu Jinqing; Lin Dong; Wu Daming; Wang Dengbin; Yang Yanmin; Cheng Kemin

    2005-01-01

    Objective: To investigate the MR imaging and DSA features together with endovascular embolization of spinal dural arteriovenous fistulae (SDAVF). Methods: Twelve patients with SDAVF underwent both MR imaging and angiography of spinal cord, 4 of them received endovascular embolization. The imaging findings of MRI and angiography in all patients were analyzed. Results: Among 12 cases with SDAVF, 11 cases showed diffuse long T 2 signal, 2 cases demonstrated inhomogeneous maculate enhancement in the spinal cord and 6 cases revealed abnormal vessels in the dorsal spaces of spinal cord on MRI. Angiography of spinal cord showed orifices of all fistulae, draining veins, the extent of lesions, amount of feeding vessels and the angiographic features in all the 12 cases. 4 cases with embolization treatment showed improvement clinically. Conclusions: Angiography of spinal cord is the main method and MRI provides important assistance for diagnosing SDAVF while endovascular embolization is an effective method for the treatment. (authors)

  11. Analysis of the potential formation of a Breccia chimney beneath the WIPP repository

    International Nuclear Information System (INIS)

    Spiegler, P.

    1982-05-01

    This report evaluates the potential formation of a Breccia pipe beginning at the Bell Canyon aquifer beneath the WIPP repository and the resulting release of radioactivity to the surface. Rock mechanics considerations indicate that the formation of a Breccia pipe by collapse of a cavern is not reasonable. Even if rock mechanics is ignored, the overlying strata act as a barrier and would prevent the release of radioactivity to the biosphere. Gradual formation of a Breccia pipe is so slow that the plutonium-239 in the waste (one of the most important long-lived components) would decay during formation. If Bell Lake and San Simon Sinks are the surface manifestation of a regional deep dissolution wedge, such a wedge is too far removed to represent pipe forming activity near the WIPP site. The formation of a Breccia pipe under the WIPP repository is highly unlikely. If it did occur, the concentration of plutonium-239 in brine reaching the surface would be less than the maximum permissible concentration in water specified in the Code of Federal Regulation Title 10, part 20

  12. Politics and technology in repository siting: military versus commercial nuclear wastes at WIPP 1972-1985

    International Nuclear Information System (INIS)

    Downey, G.L.

    1985-01-01

    During the 1970s, attempts by the federal government to develop a comprehensive system for disposing of nuclear wastes in geologic repositories were plagued by two related political problems; (1) whether or not military and commercial wastes should be buried together in the same repository, and (2) how to define the host state's role in the repository siting mechanism. This article explains why these two problems were connected by showing how they proved to be of decisive importance in the development of the Waste Isolation Pilot Plant (WIPP) project in Carlsbad, New Mexico. Although WIPP was initially conceived as a wholly military facility, The Department of Energy triggered a three-year dispute over the project's scope by proposing in 1978 to include commercial wastes in the repository. The key issue in the dispute concerned the political legitimacy of decision-making mechanisms for repository siting, which depend upon the extent to which they both adequately represent the interests of affected groups and meet an indistinct technical/political criterion of acceptable safety. DOE's ill-fated proposal to mix military and commercial disposal at WIPP demonstrated that the two rely on somewhat different conditions for their legitimacy. The agency overlapped the legitimate authorities of the federal and state governments and gave itself the hopeless task of negotiating a new boundary between them. 50 references, 3 figures

  13. Position paper on flammability concerns associated with TRU waste destined for WIPP

    International Nuclear Information System (INIS)

    1991-04-01

    The Waste Isolation Pilot Plant (WIPP), in southeastern New Mexico,is an underground repository, designed for the safe geologic disposal of transuranic (TRU) wastes generated from defense-related activities of the US Department of Energy (DOE). The WIPP storage rooms are mined in a bedded salt (halite) formation, and are located 2150 feet below the surface. After the disposal of waste in the storage rooms, closure of the repository is expected to occur by creep (plastic flow) of the salt formation, with the waste being permanently isolated from the surrounding environment. This paper has evaluated the issue of flammability concerns associated with TRU waste to be shipped to WIPP, including a review of possible scenarios that can potentially contribute to the flammability. The paper discusses existing regulations that address potential flammability concerns, presents an analysis of previous flammability-related incidents at DOE sites with respect to the current regulations, and finally, examines the degree of assurance these regulations provide in safeguarding against flammability concerns during transportation and waste handling. 50 refs., 7 figs., 7 tabs

  14. Just in Time DSA-The Hanford Nuclear Safety Basis Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Olinger, S. J.; Buhl, A. R.

    2002-02-26

    The U.S. Department of Energy, Richland Operations Office (RL) is responsible for 30 hazard category 2 and 3 nuclear facilities that are operated by its prime contractors, Fluor Hanford Incorporated (FHI), Bechtel Hanford, Incorporated (BHI) and Pacific Northwest National Laboratory (PNNL). The publication of Title 10, Code of Federal Regulations, Part 830, Subpart B, Safety Basis Requirements (the Rule) in January 2001 imposed the requirement that the Documented Safety Analyses (DSA) for these facilities be reviewed against the requirements of the Rule. Those DSA that do not meet the requirements must either be upgraded to satisfy the Rule, or an exemption must be obtained. RL and its prime contractors have developed a Nuclear Safety Strategy that provides a comprehensive approach for supporting RL's efforts to meet its long term objectives for hazard category 2 and 3 facilities while also meeting the requirements of the Rule. This approach will result in a reduction of the total number of safety basis documents that must be developed and maintained to support the remaining mission and closure of the Hanford Site and ensure that the documentation that must be developed will support: compliance with the Rule; a ''Just-In-Time'' approach to development of Rule-compliant safety bases supported by temporary exemptions; and consolidation of safety basis documents that support multiple facilities with a common mission (e.g. decontamination, decommissioning and demolition [DD&D], waste management, surveillance and maintenance). This strategy provides a clear path to transition the safety bases for the various Hanford facilities from support of operation and stabilization missions through DD&D to accelerate closure. This ''Just-In-Time'' Strategy can also be tailored for other DOE Sites, creating the potential for large cost savings and schedule reductions throughout the DOE complex.

  15. Just in Time DSA-The Hanford Nuclear Safety Basis Strategy

    International Nuclear Information System (INIS)

    Olinger, S. J.; Buhl, A. R.

    2002-01-01

    The U.S. Department of Energy, Richland Operations Office (RL) is responsible for 30 hazard category 2 and 3 nuclear facilities that are operated by its prime contractors, Fluor Hanford Incorporated (FHI), Bechtel Hanford, Incorporated (BHI) and Pacific Northwest National Laboratory (PNNL). The publication of Title 10, Code of Federal Regulations, Part 830, Subpart B, Safety Basis Requirements (the Rule) in January 2001 imposed the requirement that the Documented Safety Analyses (DSA) for these facilities be reviewed against the requirements of the Rule. Those DSA that do not meet the requirements must either be upgraded to satisfy the Rule, or an exemption must be obtained. RL and its prime contractors have developed a Nuclear Safety Strategy that provides a comprehensive approach for supporting RL's efforts to meet its long term objectives for hazard category 2 and 3 facilities while also meeting the requirements of the Rule. This approach will result in a reduction of the total number of safety basis documents that must be developed and maintained to support the remaining mission and closure of the Hanford Site and ensure that the documentation that must be developed will support: compliance with the Rule; a ''Just-In-Time'' approach to development of Rule-compliant safety bases supported by temporary exemptions; and consolidation of safety basis documents that support multiple facilities with a common mission (e.g. decontamination, decommissioning and demolition [DD and D], waste management, surveillance and maintenance). This strategy provides a clear path to transition the safety bases for the various Hanford facilities from support of operation and stabilization missions through DD and D to accelerate closure. This ''Just-In-Time'' Strategy can also be tailored for other DOE Sites, creating the potential for large cost savings and schedule reductions throughout the DOE complex

  16. Enablement of DSA for VIA layer with a metal SIT process flow

    Science.gov (United States)

    Schneider, L.; Farys, V.; Serret, E.; Fenouillet-Beranger, C.

    2016-03-01

    For technologies beyond 10 nm, 1D gridded designs are commonly used. This practice is common particularly in the case of Self-Aligned Double Patterning (SADP) metal processes where Vertical Interconnect Access (VIA) connecting metal line layers are placed along a discrete grid thus limiting the number of VIA pitches. In order to create a Vertical Interconnect Access (VIA) layer, graphoepitaxy Directed Self-Assembly (DSA) is the prevailing candidate. The technique relies on the creation of a confinement guide using optical microlithography methods, in which the BCP is allowed to separate into distinct regions. The resulting patterns are etched to obtain an ordered VIA layer. Guiding pattern variations impact directly on the placement of the target and one must ensure that it does not interfere with circuit performance. To prevent flaws, design rules are set. In this study, for the first time, an original framework is presented to find a consistent set of design rules for enabling the use of DSA in a production flow using Self Aligned Double Patterning (SADP) for metal line layer printing. In order to meet electrical requirements, the intersecting area between VIA and metal lines must be sufficient to ensure correct electrical connection. The intersecting area is driven by both VIA placement variability and metal line printing variability. Based on multiple process assumptions for a 10 nm node, the Monte Carlo method is used to set a maximum threshold for VIA placement error. In addition, to determine a consistent set of design rules, representative test structures have been created and tested with our in-house placement estimator: the topological skeleton of the guiding pattern [1]. Using this technique, structures with deviation above the maximum tolerated threshold are considered as infeasible and the appropriate set of design rules is extracted. In a final step, the design rules are verified with further test structures that are randomly generated using

  17. Assessment of chronic thromboembolic pulmonary hypertension by three-dimensional contrast-enhanced MR angiography - comparison with selective intraarterial DSA

    International Nuclear Information System (INIS)

    Kreitner, K.F.; Ley, S.; Kauczor, H.U.; Kalden, P.; Pitton, M.B.; Thelen, M.; Mayer, E.; Laub, G.

    2000-01-01

    Purpose: This study compares contrast-enhanced 3D-MR angiography (MRA) of the pulmonary arteries with selective intraarterial DSA in patients with chronic thromboembolic pulmonary hypertension. Materials and methods: 20 patients preoperatively underwent a contrast-enhanced 3D-MRA of the pulmonary arteries at 1.5 T using the phased-array body coil. For MRA, we used a 3D-Flash-sequence after bolus timing. 2 radiologists analyzed the acquired image material in consensus with respect to the detection of central thromboembolic material and the visualization of the pulmonary arterial tree. Finally, the MR angiograms were compared with selective DSA images using surgical findings as the definitive standard. Results: MRA demonstrated central thromboembolic material, vessel cut-offs and abnormal proximal-to-distal tapering in all patients. Compared to DSA, MRA depicted the pulmonary vessels up to the segmental level in all cases, it was inferior to DSA in delineation of the subsegmental arteries (sensitivity 87%, specificity 100%). The central beginning of the thromboembolic occlusions seen at MRA corresponded to the beginning of the deobliteration procedure during pulmonary thromboendarterectomy in every case. (orig.) [de

  18. The usefulness of color doppler ultrasound in diagnosing venous diseases of lower extremity: a comparison with DSA

    International Nuclear Information System (INIS)

    Zhang Yamei; Wang Shuzhi; Gu Jianpig; Chen Songwang; Huang Yan

    2009-01-01

    Objective: To evaluate the color Doppler ultrasound in diagnosing venous diseases of lower extremity, and to compare it with DSA.Methods: By using color Doppler ultrasound (CDUS) apparatus, two-dimensional spectrum, color Doppler flow image, pulse wave Doppler and Valsalva examination were performed in 48 patients with suspected venous diseases of lower extremity. The CDUS findings were compared with DSA findings. Results: Of 48 cases with suspected lower extremity venous diseases, deep vein thrombosis formation was confirmed in 27, among them 15 were accompanied with lower extremity deep venous valvular incompetence, 8 were complicated by lower extremity varicosity and 2 were associated with both conditions. Another one had cyst in the left popliteal fossa and popliteal venous thrombosis. Decreased blood flow in iliac veins was found in some cases. Pure lower extremity venous valvular incompetence was seen in 5 cases and pure lower extremity superficial varicosity in 6 cases. Six cases suffered both valvular incompetence and superficial varicosity. CDUS showed normal findings in 4 cases, of them DSA demonstrated compressed iliac vein in 2. When taking DSA as golden standard, the accuracy of CDUS was 95.83%. By using the uniformity test, Kappa value was 0.65. Conclusion: CDUS is of great clinical usefulness in diagnosing venous diseases of lower extremity as well as in evaluating the therapeutic effect. (authors)

  19. DSA study of the effect of vasopressin on the small-bowel circulation before and after embolization

    International Nuclear Information System (INIS)

    Li Xueqin; Wang Qiaoxi; Guo Yuxin; Yang Xinhong; Hu Hongyao

    2001-01-01

    Objective: To study the effect of vasopressin (VS) on the small-bowel circulation and the safety of embolotherapy for the small intestinal hemorrhage by DSA. Methods: Ten dogs were divided into three groups. Vasa recta were ligated 30 min after VS infusion ended in group A (n = 4), and 2h after VS infusion ended in group B (n = 4), they were ligated without VS infusion in control group (n = 2). DSA were performed before and after VS infusion, before and after the ligation. The tested parts of intestine were resected to make the pathologic examination a week late. Results: All branches of mesenteric arteries contracted and the contrast developed light in the intestinal wall after VS infusion. Branches contraction recovered but the contrast developed still slight in the intestinal wall about 30 min after infusion ended. All manifestation of DSA recovered to normal 2h after infusion ended. In all groups, the blood vessel net can be seen but is fewer and scattered in the area of ligation. The collocate presented soon after the ligation. The pathologic examination proved that there was only mind mucosal ischemia in all groups. Conclusion: The repressive effect of VS to the circulation of intestine weakened and then disappeared rapidly after the infusion ended. VS infusion had no significant effect on the safety of embolotherapy for small intestinal bleeding when the infusion has been finished for more than 2hr. DSA can demonstrated the circulation state of the intestine before and after embolization

  20. Comparison of hepatic MDCT, MRI, and DSA to explant pathology for the detection and treatment planning of hepatocellular carcinoma

    Directory of Open Access Journals (Sweden)

    Lauren M. Ladd

    2016-12-01

    Full Text Available Background/Aims The diagnosis and treatment plan for hepatocellular carcinoma (HCC can be made from radiologic imaging. However, lesion detection may vary depending on the imaging modality. This study aims to evaluate the sensitivities of hepatic multidetector computed tomography (MDCT, magnetic resonance imaging (MRI, and digital subtraction angiography (DSA in the detection of HCC and the consequent management impact on potential liver transplant patients. Methods One hundred and sixteen HCC lesions were analyzed in 41 patients who received an orthotopic liver transplant (OLT. All of the patients underwent pretransplantation hepatic DSA, MDCT, and/or MRI. The imaging results were independently reviewed retrospectively in a blinded fashion by two interventional and two abdominal radiologists. The liver explant pathology was used as the gold standard for assessing each imaging modality. Results The sensitivity for overall HCC detection was higher for cross-sectional imaging using MRI (51.5%, 95% confidence interval [CI]=36.2-58.4% and MDCT (49.8%, 95% CI=43.7-55.9% than for DSA (41.7%, 95% CI=36.2-47.3% (P=0.05. The difference in false-positive rate was not statistically significant between MRI (22%, MDCT (29%, and DSA (29% (P=0.67. The sensitivity was significantly higher for detecting right lobe lesions than left lobe lesions for all modalities (MRI: 56.1% vs. 43.1%, MDCT: 55.0% vs. 42.0%, and DSA: 46.9% vs. 33.9%; all P<0.01. The sensitivities of the three imaging modalities were also higher for lesions ≥2 cm vs. <2 cm (MRI: 73.4% vs. 32.7%, MDCT: 66.9% vs. 33.8%, and DSA: 62.2% vs. 24.1%; all P<0.01. The interobserver correlation was rated as very good to excellent. Conclusion The sensitivity for detecting HCC is higher for MRI and MDCT than for DSA, and so cross-sectional imaging modalities should be used to evaluate OLT candidacy.

  1. Comparison of remnant size in embolized intracranial aneurysms measured at follow-up with DSA and MRA

    Energy Technology Data Exchange (ETDEWEB)

    Serafin, Zbigniew; Strzesniewski, Piotr; Lasek, Wladyslaw [Nicolaus Copernicus University, Department of Radiology and Diagnostic Imaging, Collegium Medicum, Bydgoszcz (Poland); Beuth, Wojciech [University of Humanities and Economics in Wloclawek, Faculty of Health Sciences, Wloclawek (Poland)

    2012-12-15

    The possibility of recanalization and the need for retreatment are the most important limitations of intracranial aneurysm embolization. The purpose of the study was to compare the size of aneurysm remnants measured at follow-up with three-dimensional digital subtracted angiography (3D-DSA) and magnetic resonance angiography (MRA). Twenty-six aneurysms were found incompletely occluded in 72 consecutively examined patients at a follow-up after 3 months. The diameters and volume of aneurysm remnants were compared between 3D-DSA, time-of-flight MRA (TOF-MRA), contrast-enhanced TOF-MRA (CE-TOF-MRA), and contrast-enhanced MRA (CE-MRA) at 1.5 T. There was a significant correlation between remnant volumes calculated based on 3D-DSA and all MRA modalities. The intraobserver variability of the measurements ranged from 3.4 to 4.1 % and the interobserver variability from 5.8 to 7.3 %. There were no significant differences in the variability between the techniques. The mean residual filling volume ranged from 16.3 {+-} 19.0 mm{sup 3} in TOF-MRA to 30.5 {+-} 44.6 mm{sup 3} in 3D-DSA (P < 0.04). Significant differences were found in the volumes measured with 3D-DSA and CE-MRA as compared to TOF-MRA and CE-TOF-MRA (P < 0.01). There was a moderate significant correlation between the residual filling and the relative error of measurement in the case of TOF-MRA and CE-TOF-MRA. TOF-MRA seems to underestimate the size of aneurysm remnants detected at follow-up and should not be used as a sole imaging method to decide on re-embolization. (orig.)

  2. Comparison of remnant size in embolized intracranial aneurysms measured at follow-up with DSA and MRA

    International Nuclear Information System (INIS)

    Serafin, Zbigniew; Strzesniewski, Piotr; Lasek, Wladyslaw; Beuth, Wojciech

    2012-01-01

    The possibility of recanalization and the need for retreatment are the most important limitations of intracranial aneurysm embolization. The purpose of the study was to compare the size of aneurysm remnants measured at follow-up with three-dimensional digital subtracted angiography (3D-DSA) and magnetic resonance angiography (MRA). Twenty-six aneurysms were found incompletely occluded in 72 consecutively examined patients at a follow-up after 3 months. The diameters and volume of aneurysm remnants were compared between 3D-DSA, time-of-flight MRA (TOF-MRA), contrast-enhanced TOF-MRA (CE-TOF-MRA), and contrast-enhanced MRA (CE-MRA) at 1.5 T. There was a significant correlation between remnant volumes calculated based on 3D-DSA and all MRA modalities. The intraobserver variability of the measurements ranged from 3.4 to 4.1 % and the interobserver variability from 5.8 to 7.3 %. There were no significant differences in the variability between the techniques. The mean residual filling volume ranged from 16.3 ± 19.0 mm 3 in TOF-MRA to 30.5 ± 44.6 mm 3 in 3D-DSA (P < 0.04). Significant differences were found in the volumes measured with 3D-DSA and CE-MRA as compared to TOF-MRA and CE-TOF-MRA (P < 0.01). There was a moderate significant correlation between the residual filling and the relative error of measurement in the case of TOF-MRA and CE-TOF-MRA. TOF-MRA seems to underestimate the size of aneurysm remnants detected at follow-up and should not be used as a sole imaging method to decide on re-embolization. (orig.)

  3. Comparison of remnant size in embolized intracranial aneurysms measured at follow-up with DSA and MRA.

    Science.gov (United States)

    Serafin, Zbigniew; Strześniewski, Piotr; Lasek, Władysław; Beuth, Wojciech

    2012-12-01

    The possibility of recanalization and the need for retreatment are the most important limitations of intracranial aneurysm embolization. The purpose of the study was to compare the size of aneurysm remnants measured at follow-up with three-dimensional digital subtracted angiography (3D-DSA) and magnetic resonance angiography (MRA). Twenty-six aneurysms were found incompletely occluded in 72 consecutively examined patients at a follow-up after 3 months. The diameters and volume of aneurysm remnants were compared between 3D-DSA, time-of-flight MRA (TOF-MRA), contrast-enhanced TOF-MRA (CE-TOF-MRA), and contrast-enhanced MRA (CE-MRA) at 1.5 T. There was a significant correlation between remnant volumes calculated based on 3D-DSA and all MRA modalities. The intraobserver variability of the measurements ranged from 3.4 to 4.1 % and the interobserver variability from 5.8 to 7.3 %. There were no significant differences in the variability between the techniques. The mean residual filling volume ranged from 16.3 ± 19.0 mm(3) in TOF-MRA to 30.5 ± 44.6 mm(3) in 3D-DSA (P < 0.04). Significant differences were found in the volumes measured with 3D-DSA and CE-MRA as compared to TOF-MRA and CE-TOF-MRA (P < 0.01). There was a moderate significant correlation between the residual filling and the relative error of measurement in the case of TOF-MRA and CE-TOF-MRA. TOF-MRA seems to underestimate the size of aneurysm remnants detected at follow-up and should not be used as a sole imaging method to decide on re-embolization.

  4. The application of DSA bolus chase technology in diagnosing the vascular disorders of lower extremities due to diabetes mellitus

    International Nuclear Information System (INIS)

    Ren Chongyang; Di Zhenhai; Mao Xuequn; Zou Rong; Zhang Jian; Wang Meirong; Li Quan

    2010-01-01

    Objective: To retrospectively evaluate the digital subtraction angiography (DSA) bolus chase technology in diagnosing the vascular disorders of lower extremities due to diabetes mellitus. Methods: From January 2004 to March 2010, DSA was performed in forty-five diabetes patients with suspicious vascular diseases of lower extremities. Among them, 24 cases (31 lower limbs)were examined with DSA bolus chase technology and the remaining 21 cases (21 lower limbs)were examined with traditional segmentational technique. The contrast dosage used in angiography, the total exposure time, the examination time and the imaging value for making diagnosis were analyzed and compared between two techniques. Results: For DSA bolus chase technology group, the contrast dosage used in angiography, the total exposure time and the examination time were 25.26 ml, 13.23 s and 37.26 min, respectively,with an average exposure of 101.65 pictures. For traditional segmentational technique group, the contrast dosage used in angiography, the total exposure time and the examination time were 130.00 ml, 52.38 s and 50.48 min, respectively, with an average exposure of 118.33 pictures. The percentage of high quality images in bolus chase technology group and in traditional segmentational technique group were 90.3% and 90.5%, respectively. All the images could meet the requirements for making a reliable diagnosis. Conclusion: Digital subtraction angiography by using bolus-chase technology can well demonstrate the vascular pathology of lower extremities caused by diabetes mellitus, obtain sufficient imaging information necessary for making a reliable diagnosis. DSA bolus chase technology is superior to traditional segmentational technique in shortening procedure time, reducing contrast medium dosage and decreasing radiation dose. (authors)

  5. The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145

    International Nuclear Information System (INIS)

    Patterson, Russ; Klein, Thomas; Van Luik, Abraham

    2013-01-01

    The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance

  6. Determination of Waste Isolation Pilot Plant (WIPP) management and institutional requirements documents for contact-handled (CH) critical systems

    International Nuclear Information System (INIS)

    1990-01-01

    This document lists the critical requirements documents applicable to the receipt of contact-handled waste at the Waste Isolation Pilot Plant. It also describes the processes used to determine the applicability of each document. This analysis is based on the applicable documents that were in effect in the February 1988 time frame. 2 refs

  7. Source term estimation and the isotopic ratio of radioactive material released from the WIPP repository in New Mexico, USA

    International Nuclear Information System (INIS)

    Thakur, P.

    2016-01-01

    After almost 15 years of operations, the Waste Isolation Pilot Plant (WIPP) had one of its waste drums breach underground as a result of a runaway chemical reaction in the waste it contained. This incident occurred on February 14, 2014. Moderate levels of radioactivity were released into the underground air. A small portion of the contaminated underground air also escaped to the surface through the ventilation system and was detected approximately 1 km away from the facility. According to the source term estimation, the actual amount of radioactivity released from the WIPP site was less than 1.5 mCi. The highest activity detected on the surface was 115.2 μBq/m 3 for 241 Am and 10.2 μBq/m 3 for 239+240 Pu at a sampling station located 91 m away from the underground air exhaust point and 81.4 μBq/m 3 of 241 Am and 5.8 μBq/m 3 of 239+240 Pu at a monitoring station located approximately 1 km northwest of the WIPP facility. The dominant radionuclides released were americium and plutonium, in a ratio that matches the content of the breached drum. Air monitoring across the WIPP site intensified following the first reports of radiation detection underground to determine the extent of impact to WIPP personnel, the public, and the environment. In this paper, the early stage monitoring data collected by an independent monitoring program conducted by the Carlsbad Environmental Monitoring & Research Center (CEMRC) and an oversight monitoring program conducted by the WIPP's management and operating contractor, the Nuclear Waste Partnership (NWP) LLC were utilized to estimate the actual amount of radioactivity released from the WIPP underground. The Am and Pu isotope ratios were measured and used to support the hypothesis that the release came from one drum identified as having breached that represents a specific waste stream with this radionuclide ratio in its inventory. This failed drum underwent a heat and gas producing reaction that overpowered its vent and

  8. Tumor vascularity of experimentally induced VX2 carcinoma in the rabbit thigh: evaluation with enhanced power doppler sonography and DSA correlated with histopathologic findings

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Hoon; Han, Joon Koo; Chung, Jin Wook; Lee, Kyoung Ho; Kim, Se Hyung; Kim, Seog Joon; Choi, Byung Ihn; Chang, Kee Hyun [College of Medicine, Seoul National Univ., Seoul (Korea, Republic of)

    2002-05-01

    To describe findings of enhanced power Doppler sonography and DSA in experimentally induced VX2 carcinomas in rabbit thigh and to correlate the imaging findings with the histopathologic features. A total of 30 VX2 carcinomas were implanted in rabbit thigh, and after conventional and enhanced power Doppler sonography and DSA, histopathologic examination was performed. Enhanced power Doppler sonography and DSA, were used to determine the distribution pattern of tumor vascularity; to assess its grade and the percentage of a tumor area occupied by vessels, conventional and enhanced power Doppler sonography, as well as DSA, were used. The grade of necrosis and the development of fibrovascular stroma and capsule were histopathologically determined. The findings of power Doppler sonography were compared with those of DSA and the imaging features were correlated with the histopathologic features. At enhanced power Doppler sonography, the signal was either avascular (n=9), peripheral (n=15) or diffuse (n=6), while at DSA, the corresponding totals were eight, fourteen and eight. There was statistically significant corelation between enhanced power Doppler sonogrpahy and DSA, both in their depiction of the distribution of patterns of tumor vascularity and as regards their findings of grade and percentage of vascular area. As determined by both conventional and enhanced power Doppler sonogrpahy, and by DSA, grade of necrosis and the development of fibrovascular stroma and a capsule correlated with grade and the percentage of vascular area. Experimentally induced VX2 carcinomas in rabbit thigh demonstrated various patterns of tumor vascularity, and the findings of enhanced power Doppler sonography correlated with those of DSA. Tumor vascularity, as demonstrated by two imaging modalities, correlated closely with grade of necrosis and the development of fibrovascular stroma and a capsule, as revealed by histopathologic examination.

  9. Expert (Peer) Reviews at the Waste Isolation Pilot Plant (WIPP): Making Complex Information and Decision Making Transparent

    International Nuclear Information System (INIS)

    Eriksson, Leif G.

    2001-01-01

    On the 18th of May 1998, based on the information provided by the United Sates Department of Energy (DOE) in support of the 1996 Waste Isolation Pilot Plant (WIPP) Compliance Certification Application, the U.S. Environmental Protection Agency certified the proposed deep geological repository for disposal of long-lived, defense-generated, transuranic radioactive waste at the WIPP site in New Mexico, United States of America, was compliant with all applicable radioactive waste disposal regulations. Seven domestic and one joint international peer reviews commissioned by the DOE were instrumental in making complex scientific and engineering information, as well as the related WIPP decision-making process, both credible and transparent to the majority of affected and interested parties and, ultimately, to the regulator

  10. Construction of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Munson, D.E.; Matalucci, R.V.; Hoag, D.L.; Blankenship D.A.

    1997-02-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories has the responsibility for experimental activities at the WIPP and has emplaced several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The construction of the tests relied heavily on earlier excavations at the WIPP site to provide a basis for selecting excavation, surveying, and instrumentation methods, and achievable construction tolerances. The tests were constructed within close tolerances to provide consistent room dimensions and accurate placement of gages. This accuracy has contributed to the high quality of data generated which in turn has facilitated the comparison of test results to numerical predictions. The purpose of this report is to detail the construction activities of the TSI tests

  11. Department of Energy Operation Quality Assurance Program for the Waste Isolation Pilot Plant (WIPP) Project (Carlsbad, New Mexico)

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of this plan is to describe the Quality Assurance (QA)reverse arrow Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Project Participants: the Scientific Advisor (Sandia National Laboratory) and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the Pre-Operational and Operational phases of the WIPP Project not addressed under the construction phase. This plan also requires the QA Programs for DOE and Project Participants to be structured so as to comply with this plan and ANSI-ASME NQA-1. The prime responsibility for Operational Quality Assurance rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Scientific Advisor and the Management and Operating Contractor. Overviews of selected operational and testing activities will be are conducted in accordance with prescribed requirements and that adequate documentation of these activities is maintained. 4 figs

  12. Review of the WIPP draft application to show compliance with EPA transuranic waste disposal standards

    International Nuclear Information System (INIS)

    Neill, R.H.; Chaturvedi, L.; Clemo, T.M.

    1996-03-01

    The purpose of the New Mexico Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The EEG was established in 1978 with funds provided by the U.S. Department of Energy (DOE) to the State of New Mexico. Public Law 100-456, the National Defense Authorization Act, Fiscal Year 1989, Section 1433, assigned EEG to the New Mexico Institute of Mining and Technology and continued the original contract DE-AC04-79AL10752 through DOE contract DE-AC04-89AL58309. The National Defense Authorization Act for Fiscal Year 1994, Public Law 103-160, continues the authorization. EEG performs independent technical analyses of the suitability of the proposed site; the design of the repository, its planned operation, and its long-term integrity; suitability and safety of the transportation systems; suitability of the Waste Acceptance Criteria and the generator sites' compliance with them; and related subjects. These analyses include assessments of reports issued by the DOE and its contractors, other federal agencies and organizations, as they relate to the potential health, safety and environmental impacts from WIPP. Another important function of EEG is the independent environmental monitoring of background radioactivity in air, water, and soil, both on-site and off-site

  13. Review of the WIPP draft application to show compliance with EPA transuranic waste disposal standards

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R.H.; Chaturvedi, L.; Clemo, T.M. [and others

    1996-03-01

    The purpose of the New Mexico Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The EEG was established in 1978 with funds provided by the U.S. Department of Energy (DOE) to the State of New Mexico. Public Law 100-456, the National Defense Authorization Act, Fiscal Year 1989, Section 1433, assigned EEG to the New Mexico Institute of Mining and Technology and continued the original contract DE-AC04-79AL10752 through DOE contract DE-AC04-89AL58309. The National Defense Authorization Act for Fiscal Year 1994, Public Law 103-160, continues the authorization. EEG performs independent technical analyses of the suitability of the proposed site; the design of the repository, its planned operation, and its long-term integrity; suitability and safety of the transportation systems; suitability of the Waste Acceptance Criteria and the generator sites` compliance with them; and related subjects. These analyses include assessments of reports issued by the DOE and its contractors, other federal agencies and organizations, as they relate to the potential health, safety and environmental impacts from WIPP. Another important function of EEG is the independent environmental monitoring of background radioactivity in air, water, and soil, both on-site and off-site.

  14. Calibration and application of a DSA Compact model for graphoepitaxy hole processes using contour-based metrology

    Science.gov (United States)

    Fenger, Germain; Burbine, Andrew; Torres, J. Andres; Ma, Yuansheng; Granik, Yuri; Krasnova, Polina; Vandenberghe, Geert; Gronheid, Roel; Bekaert, Joost

    2014-10-01

    Significant interest from the integrated circuit (IC) industry has been placed on directed selfassembly (DSA) for sub 10nm nodes. DSA is being considered as a cost reduction complementary process to multiple patterning (MP) and an enabler of new technology nodes. However, to realize the potential of this technology, it is essential to look holistically at the necessary infrastructure from the point of view of materials, hardware, software, process integration and design methodologies which enable its deployment in large volume manufacturing. One key aspect in enabling DSA processes is the ability to mirror functionality of full chip mask synthesis and verification methods of existing tools used in production. One of those critical components is the ability to accurately model the placement of the target phases in the DSA process with a given mask shape, as well as determining the conditions at which unwanted phase transitions start to occur. Self-consistent field theory and Monte Carlo1 simulators have the capability to probe and explore the mechanisms driving the different phases of a diblock copolymer system. While such methods are appropriate to study the nature of the self-assembly process, they are computationally expensive and they cannot be used to perform mask synthesis operations nor full chip verification. The nature of a compact model is to make a series of approximations allowing a simpler description of the problem in a way that the phenomena of interest can be sufficiently captured even if it is at the expense of its generality. In this case we focus our effort in establishing the minimum set of conditions that a compact model for the manufacture of contact holes using a grapho epitaxy process for a PS-PMMA diblock copolymer system needs. The processes uses etched short trenches as guiding patterns in which the vertical DSA cylinders are formed. By focusing in the phase of interest (i.e., cylinder forming conditions), it is possible to reformulate the

  15. Image processing of images from peripheral-artery digital subtraction angiography (DSA) studies

    International Nuclear Information System (INIS)

    Wilson, D.L.; Tarbox, L.R.; Cist, D.B.; Faul, D.D.

    1988-01-01

    A system is being developed to test the possibility of doing peripheral, digital subtraction angiography (DSA) with a single contrast injection using a moving gantry system. Given repositioning errors that occur between the mask and contrast-containing images, factors affecting the success of subtractions following image registration have been investigated theoretically and experimentally. For a 1 mm gantry displacement, parallax and geometric image distortion (pin-cushion) both give subtraction errors following registration that are approximately 25% of the error resulting from no registration. Image processing techniques improve the subtractions. The geometric distortion effect is reduced using a piece-wise, 8 parameter unwarping method. Plots of image similarity measures versus pixel shift are well behaved and well fit by parabola, leading to the development of an iterative, automatic registration algorithm that uses parabolic prediction of the new minimum. The registration algorithm converges quickly (less than 1 second on a MicroVAX) and is relatively immune to the region of interest (ROI) selected

  16. In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

    International Nuclear Information System (INIS)

    Klein, Thomas; Patterson, Russell; Camphouse, Chris; Herrick, Courtney; Kirchner, Thomas; Malama, Bwalya; Zeitler, Todd; Kicker, Dwayne

    2013-01-01

    There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling

  17. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  18. WASTE ISOLATION PILOT PLANT (WIPP): THE NATIONS' SOLUTION TO NUCLEAR WASTE STORAGE AND DISPOSAL ISSUES

    Energy Technology Data Exchange (ETDEWEB)

    Lopez, Tammy Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-07-17

    In the southeastern portion of my home state of New Mexico lies the Chihuahauan desert, where a transuranic (TRU), underground disposal site known as the Waste Isolation Pilot Plant (WIPP) occupies 16 square miles. Full operation status began in March 1999, the year I graduated from Los Alamos High School, in Los Alamos, NM, the birthplace of the atomic bomb and one of the nation’s main TRU waste generator sites. During the time of its development and until recently, I did not have a full grasp on the role Los Alamos was playing in regards to WIPP. WIPP is used to store and dispose of TRU waste that has been generated since the 1940s because of nuclear weapons research and testing operations that have occurred in Los Alamos, NM and at other sites throughout the United States (U.S.). TRU waste consists of items that are contaminated with artificial, man-made radioactive elements that have atomic numbers greater than uranium, or are trans-uranic, on the periodic table of elements and it has longevity characteristics that may be hazardous to human health and the environment. Therefore, WIPP has underground rooms that have been carved out of 2,000 square foot thick salt formations approximately 2,150 feet underground so that the TRU waste can be isolated and disposed of. WIPP has operated safely and successfully until this year, when two unrelated events occurred in February 2014. With these events, the safety precautions and measures that have been operating at WIPP for the last 15 years are being revised and improved to ensure that other such events do not occur again.

  19. Studies on blood supply of liver metastasis with DSA, CT and portal vein perfusion CT during superior mesenteric arterial portography

    International Nuclear Information System (INIS)

    Li Zhigang; Shi Gaofeng; Huang Jingxiang; Li Shunzong; Liang Guoqing; Wang Hongguang; Han Pengyin; Wang Qi; Gu Tieshu

    2008-01-01

    Objective: To probe the blood supply of liver metastasis by celiac artery, proper hepatic artery DSA, portal vein perfusion CT during superior mesenteric arterial portography (PCTAP). Methods: One hundred patients with liver metastases were examined prospectively by plain CT scan, multiphase enhanced CT scan, celiac arteriography and proper hepatic arteriography. Of them, 56 patients were examined by PCTAP. All primary lesions were confirmed by operation and (or) pathology examination. In order to investigate the blood supply of metastasis lesions, the software of Photoshop was used to obtain the time-attenuation curves (TDC) of tumor center, tumor edge, portal vein and normal liver parenchyma adjacent to the tumor to calculate liver perfusion for DSA image analysis, while a deconvolution model from CT perfusion software was designed for the dual blood supply. Results: DSA findings: TDC of proper hepatic arteriography showed: the mean peak concentration (K value) in tumor centers was (67 ± 12)%, and it was (76 ± 15)% for peritumor tissue, (51 ± 10)% in normal liver parenchyma. TDC of celiac arteriogaphy showed that the contrast concentration of tumor centers and tumor edge increased fast in early stage, then maintained a slight upward plateau, in the meanwhile, the contrast concentration of normal liver parenchyma kept increasing slowly. PCTAP findings: tumors exhibited no enhancement during 30 s continued scans. Conclusion: The blood supply of liver metastasis mainly comes from hepatic artery, but barely from portal vein. (authors)

  20. DSA-guided embolization in establishing different canine spinal cord ischemia models and relevant diffusion-weighted imaging study

    International Nuclear Information System (INIS)

    Zhang Jingsong; Sun Lijun; Huan Yi; He Hongde; Zhang Xuexin; Zhao Haitao; Zhang Jing; Zhang Xijing

    2006-01-01

    Objective: To evaluate DSA-guided embolization in establishing different spinal cord ischemia models of canine and relevant diffusion-weighted imaging (DWI) application. Methods: Nine canines were randomly divided into three groups with different matching of lipiodol and diatrizoate meglumine which were injected into bilateral intercostal arteries at 9-11 level guided by DSA monitor. Then observe the changes of motor function and pathologic findings, especially perform routine MRI and DWI by a 1.5 T MR system. Results: Except one case, 8 embolization models were established successfully. Among three groups, slight-group got slight injury and muscle power was about 3-5 grade and range of injury was about two vertebra distance; medium-group presented obvious paraplegia and muscle power was 0-1 grade and range of injury was between 3-4 vertebra distance; severe-group showed greater severity and larger range of injury. All lesions presented high signals at routine MRI and DWI. Conclusion: Using different matching of lipiodol and diatrizoate meglumine can establish different spinal cord ischemia models of canine by DSA- guided embolization and DWI can be performed successfully by 1.5 T MR system, which may be a good method for advanced study of spinal cord ischemia. (authors)

  1. Comparative diagnosis of venous occlusive diseases of lower extremity through multi-slice CT angiography and DSA

    International Nuclear Information System (INIS)

    Wu Gang; Gu Jianping; Wang Shuzhi; Yin Xinxao; Lu Lingquan

    2008-01-01

    Objective: To assess the clinical application value of multi-slice CT angiography(MSCTA) in the diagnosis of venous occlusive diseases of lower extremity. Methods: Thirty-two suspected patients with venous occlusive diseases of lower extremity underwent 16-slice MSCTA and DSA simultaneously. The MSCTA technique and its diagnostic value were analyzed with clinical data. Results: Thirty-two cases of suspected lower extremity venous occlusive diseases were diagnosed by MSCTA, including 19 cases of iliac vein compression syndrome (left iliac vein in 16 cases, right iliac vein 3 cases). Nine cases of deep vein thrombosis (2 on left side, 5 on right and another 2 bilaterally). The left external iliac vein was compressed by a cyst in left inguinal region in one case and another case showed simple varicosis of superficial veins of the left lower limb. The results were similar demonstrated by DSA and MSCTA in above thirty cases. The right femoral and popliteal venous dilatations were diagnosed by MSCTA in one case and no abnormality in the other. The two cases were found to be valvular functional defect of deep veins of lower limb by DSA. Conclusion: MSCTA possesses rather high application value in the diagnosis of venous occlusive diseases of lower extremity. (authors)

  2. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-29

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

  3. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Chapter D, Appendix D1 (beginning), Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Lappin, A. R.

    1993-03-01

    The Waste Isolation Pilot Plant (WIPP), which is designed for receipt, handling, storage, and permanent isolation of defense-generated transuranic wastes, is being excavated at a depth of approximately 655 m in bedded halites of the Permian Salado Formation of southeastern New Mexico. Site-characterization activities at the present WIPP site began in 1976. Full construction of the facility began in 1983, after completion of ``Site and Preliminary Design Validation`` (SPDV) activities and reporting. Site-characterization activities since 1983 have had the objectives of updating or refining the overall conceptual model of the geologic, hydrologic, and structural behavior of the WIPP site and providing data adequate for use in WIPP performance assessment. This report has four main objectives: 1. Summarize the results of WIPP site-characterization studies carried out since the spring of 1983 as a result of specific agreements between the US Department of Energy and the State of New Mexico. 2. Summarize the results and status of site-characterization and facility-characterization studies carried out since 1983, but not specifically included in mandated agreements. 3. Compile the results of WIPP site-characterization studies into an internally consistent conceptual model for the geologic, hydrologic, geochemical, and structural behavior of the WIPP site. This model includes some consideration of the effects of the WIPP facility and shafts on the local characteristics of the Salado and Rustler Formations. 4. Discuss the present limitations and/or uncertainties in the conceptual geologic model of the WIPP site and facility. The objectives of this report are limited in scope, and do not include determination of whether or not the WIPP Project will comply with repository-performance criteria developed by the US Environmental Protection Agency (40CFR191).

  4. Stable isotope study of soil water, WIPP site New Mexico: estimation of recharge to Rustler aquifers

    International Nuclear Information System (INIS)

    Campbell, A.R.; Phillips, F.M.; Vanlandingham, R.J.

    1996-01-01

    Defining the hydrologic setting of the Waste Isolation Pilot Plant (WIPP) is an important step for site characterization and performance assessment. From past research there is a controversy about the timing of recharge to the aquifers in the Rustler Formation which overlies the repository. The stable isotopic composition (δD and δD 18 O) of the water has been used in this argument but with ambiguous conclusions. Soil cores from WIPP have been sampled for δD, δD 18 O, Cl - and water content. The data indicate that there is a small amount of infiltration (.2 to 2 mm/yr) through the desert soil. The δD and δD 18 O analyses suggest that meteoric water in the area can have a stable isotope composition similar to that in the Rustler Fm. Further supporting evidence come from the isotopic composition of drip and pool waters in nearby Carlsbad Caverns. This indicates that the water in the Rustler Fm. need not have been recharged in the past (>10,000 yrs.) under different climatic conditions. (author) 8 figs., 2 tabs., 16 refs

  5. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  6. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2000-01-01

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  7. Results from simulated remote-handled transuranic waste experiments at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1992-01-01

    Multi-year, simulated remote-handled transuranic waste (RH TRU, nonradioactive) experiments are being conducted underground in the Waste Isolation Pilot-Plant (WIPP) facility. These experiments involve the near-reference (thermal and geometrical) testing of eight full size RH TRU test containers emplaced into horizontal, unlined rock salt boreholes. Half of the test emplacements are partially filled with bentonite/silica-sand backfill material. All test containers were electrically heated at about 115 W/each for three years, then raised to about 300 W/each for the remaining time. Each test borehole was instrumented with a selection of remote-reading thermocouples, pressure gages, borehole vertical-closure gages, and vertical and horizontal borehole-diameter closure gages. Each test emplacements was also periodically opened for visual inspections of brine intrusions and any interactions with waste package materials, materials sampling, manual closure measurements, and observations of borehole changes. Effects of heat on borehole closure rates and near-field materials (metals, backfill, rock salt, and intruding brine) interactions were closely monitored as a function of time. This paper summarizes results for the first five years of in situ test operation with supporting instrumentation and laboratory data and interpretations. Some details of RH TRU waste package materials, designs, and assorted underground test observations are also discussed. Based on the results, the tested RH TRU waste packages, materials, and emplacement geometry in unlined salt boreholes appear to be quite adequate for initial WIPP repository-phase operations

  8. The influence of aerosol particle collection mechanisms on the WIPP alpha-6 CAM detection efficiency

    International Nuclear Information System (INIS)

    Bartlett, W.T.

    1996-01-01

    Alpha-6 continuous air monitors (CAMs) are used at the Waste Isolation Pilot Plant (WIPP) in the underground salt mine proposed for transuranic waste disposal near Carlsbad, New Mexico. Previous reviews of CAM operational data indicate that alpha spectra, background subtract methods, and alpha detection efficiency are significantly affected by salt aerosol. Gravimetric analyses of CAM sampling filters indicate that sampling-filter salt deposits are of sufficient magnitude to cause spectral degradation and efficiency losses. It was previously assumed that salt aerosol was mechanically collected on the surface of the sampling filter, but other aerosol collection mechanisms, such as electrostatic, diffusional, and inertial impaction, cannot be ruled out. Microscopic observations of the sampling filters indicate that particle form complex structures on the sampling filter surface, and that electrostatic, diffusional, and inertial impaction are occurring. Aerosol particles are likely to penetrate the complex surface salt matrix, and alpha particle energy will be lost before reaching the CAM detector. Penetration of a polydisperse aerosol into the sampling-filter salt deposits accounts for degraded spectra and efficiency loss observed at the WIPP. It was recommended that CAMs should not be considered operational when 0.5 to 2.0 mg cm -2 of sampling-filter salt is present on the sampling filter

  9. Potential release scenario and radiological consequence evaluation of mineral resources at WIPP

    International Nuclear Information System (INIS)

    Little, M.S.

    1982-05-01

    This report has reviewed certain of the natural resources which may be found at the site of the nuclear waste repository being considered for southeastern New Mexico, and discussed the scenarios which have been used to estimate the radiological consequences from the mining of these resources several hundred years after the radioactive waste has been emplaced. It has been concluded that the radiological consequences of the mining of potash or hydrocarbons (mostly natural gas) are probably bounded by the consequences of hydrologic breach scenarios already considered by the US Department of Energy, and by reports of EEG. These studies conclude that the resultant doses would not constitute a significant threat to public health. This report also evaluates the radiological consequences of solution mining of halite at the WIPP site. Although such mining in the Delaware Basin and particularly at the WIPP site, is not likely at the present time, significant economic, social or climatic changes a few hundred years after emplacement may make these resources more attractive. The DOE did not consider such mining at the site credible

  10. Geochemistry of Salado Formation brines recovered from the Waste Isolation Pilot Plant (WIPP) repository

    International Nuclear Information System (INIS)

    Abitz, R.; Myers, J.; Drez, P.; Deal, D.

    1990-01-01

    Intergranular brines recovered from the repository horizon of the Waste Isolation Pilot Plant (WIPP) have major- and trace-element compositions that reflect seawater evaporation and diagenetic processes. Brines obtained from repository drill holes are heterogenous with respect to composition, but their compositional fields are distinct from those obtained from fluid inclusions in WIPP halite. The heterogeneity of brine compositions within the drill-hole population indicates a lack of mixing and fluid homogenization within the salt at the repository level. Compositional differences between intergranular (drill hole) and intragranular (fluid inclusions) brines is attributed to isolation of the latter from diagenetic fluids that were produced from dehydration reactions involving gypsum and clay minerals. Modeling of brine-rock equilibria indicates that equilibration with evaporite minerals controls the concentrations of major elements in the brine. Drill-hole brines are in equilibrium with the observed repository minerals halite, anhydrite, magnesite, polyhalite and quartz. The equilibrium model supports the derivation of drill-hole brines from near-field fluid, rather than large-scale vertical migration of fluids from the overlying Rustler or underlying Castile Formations. 13 refs., 6 figs., 6 tabs

  11. Petrographic study of evaporite deformation near the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Borns, D.J.

    1983-06-01

    The Delaware Basin of southeastern New Mexico contains about 1000 m of layered evaporites. Areas in the northern Delaware Basin, bordering the Capitan reef, have anomalous seismic reflection characteristics, such as loss in reflector continuity. Core from holes within this zone exhibits complex mesoscopic folds and extension structures. On a larger scale, anticlines and synclines are indicated by structure contours based on boreholes. The deformation is probably gravity-driven. Such a process is initiated by basin tilting during either a Mesozoic or Cenozoic period of uplift. Small-scale structures suggest that deformation was episodic with an early, syndepositional stage of isoclinal folding. Later, open-to-tight asymmetric folding is more penetrative and exhibits a sense of asymmetry opposite to that of the earlier isoclinal folding. The younger folds are associated with development of zonal crenulation cleavage and microboundinage of more competent carbonate layers. At the same time, halite beds developed dimensional fabrics and convolute folds in anhydrite stringers. Late-stage, near-vertical fractures formed in competent anhydrite layers. Microscopic textures exhibit rotated anhydrite porphyroblasts, stress shadow growth, and microboundinage. Except during late-stage deformation, anhydrite and halite recrystallized synkinematically. Drastic strength reduction in anhydrites through dynamic recrystallization occurs experimentally near 200 0 C. However, evaporites of the WIPP site never experienced temperatures > 40 0 C. Microscopic fabrics and P, T history of the evaporites suggest that pressure solution was the active mechanism during deformation of evaporites at the WIPP site

  12. Test plan: Gas-threshold-pressure testing of the Salado Formation in the WIPP underground facility

    International Nuclear Information System (INIS)

    Saulnier, G.J. Jr.

    1992-03-01

    Performance assessment for the disposal of radioactive waste from the United States defense program in the WIPP underground facility must assess the role of post-closure was generation by waste degradation and the subsequent pressurization of the facility. be assimilated by the host formation will Whether or not the generated gas can be assimilated by the host formation will determine the ability of the gas to reach or exceed lithostatic pressure within the repository. The purpose of this test plan is (1) to present a test design to obtain realistic estimates of gas-threshold pressure for the Salado Formation WIPP underground facility including parts of the formation disturbed by the underground of the Salado, and (2) to provide a excavations and in the far-field or undisturbed part framework for changes and amendments to test objectives, practices, and procedures. Because in situ determinations of gas-threshold pressure in low-permeability media are not standard practice, the methods recommended in this testplan are adapted from permeability-testing and hydrofracture procedures. Therefore, as the gas-threshold-pressure testing program progresses, personnel assigned to the program and outside observers and reviewers will be asked for comments regarding the testing procedures. New and/or improved test procedures will be documented as amendments to this test plan, and subject to similar review procedures

  13. 40 CFR 194.8 - Approval process for waste shipment from waste generator sites for disposal at the WIPP.

    Science.gov (United States)

    2010-07-01

    ... accordance with § 194.24(c)(4), to confirm that the total amount of each waste component that will be... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Approval process for waste shipment from waste generator sites for disposal at the WIPP. 194.8 Section 194.8 Protection of Environment...

  14. Numerical simulation of ground-water flow in the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site: Second interim report

    International Nuclear Information System (INIS)

    LaVenue, A.M.; Haug, A.; Kelley, V.A.

    1988-03-01

    This hydrogeologic modeling study has been performed as part of the regional hydrologic characterization of the Waste Isolation Pilot Plant (WIPP) Site in southeastern New Mexico. The study resulted in an estimation of the transmissivity distrubution, hydraulic potentials, flow field, and fluid densities in the Culebra Dolomite Member of the Permian Rustler Formation at the WIPP site. The three-dimensional finite-difference code SWIFT-II was employed for the numerical modeling, using variable-fluid-density and a single-porosity formulation. The modeled area includes and extends beyond the WIPP controlled zone (Zone 3). The work performed consisted of modeling the hydrogeology of the Culebra using two approaches: (1) steady-state modeling to develop the best estimate of the undisturbed head distribution, i.e., of the situation before sinking if the WIPP shafts, which began in 1981; and (2) superimposed transient modeling of local hydrologic responses to excavation of the three WIPP shafts at the center of the WIPP site, as well as to various well tests. Boundary conditions (prescribed constant fluid pressures and densities) were estimated using hydraulic-head and fluid-density data obtained from about 40 wells at and near the WIPP site. The transient modeling used the calculated steady-state freshwater heads as initial conditions. 107 refs., 112 figs., 22 tabs

  15. Numerical simulation of ground-water flow in the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site: Second interim report

    Energy Technology Data Exchange (ETDEWEB)

    LaVenue, A.M.; Haug, A.; Kelley, V.A.

    1988-03-01

    This hydrogeologic modeling study has been performed as part of the regional hydrologic characterization of the Waste Isolation Pilot Plant (WIPP) Site in southeastern New Mexico. The study resulted in an estimation of the transmissivity distrubution, hydraulic potentials, flow field, and fluid densities in the Culebra Dolomite Member of the Permian Rustler Formation at the WIPP site. The three-dimensional finite-difference code SWIFT-II was employed for the numerical modeling, using variable-fluid-density and a single-porosity formulation. The modeled area includes and extends beyond the WIPP controlled zone (Zone 3). The work performed consisted of modeling the hydrogeology of the Culebra using two approaches: (1) steady-state modeling to develop the best estimate of the undisturbed head distribution, i.e., of the situation before sinking if the WIPP shafts, which began in 1981; and (2) superimposed transient modeling of local hydrologic responses to excavation of the three WIPP shafts at the center of the WIPP site, as well as to various well tests. Boundary conditions (prescribed constant fluid pressures and densities) were estimated using hydraulic-head and fluid-density data obtained from about 40 wells at and near the WIPP site. The transient modeling used the calculated steady-state freshwater heads as initial conditions. 107 refs., 112 figs., 22 tabs.

  16. Source term estimation and the isotopic ratio of radioactive material released from the WIPP repository in New Mexico, USA.

    Science.gov (United States)

    Thakur, P

    2016-01-01

    After almost 15 years of operations, the Waste Isolation Pilot Plant (WIPP) had one of its waste drums breach underground as a result of a runaway chemical reaction in the waste it contained. This incident occurred on February 14, 2014. Moderate levels of radioactivity were released into the underground air. A small portion of the contaminated underground air also escaped to the surface through the ventilation system and was detected approximately 1 km away from the facility. According to the source term estimation, the actual amount of radioactivity released from the WIPP site was less than 1.5 mCi. The highest activity detected on the surface was 115.2 μBq/m(3) for (241)Am and 10.2 μBq/m(3) for (239+240)Pu at a sampling station located 91 m away from the underground air exhaust point and 81.4 μBq/m(3) of (241)Am and 5.8 μBq/m(3) of (239+240)Pu at a monitoring station located approximately 1 km northwest of the WIPP facility. The dominant radionuclides released were americium and plutonium, in a ratio that matches the content of the breached drum. Air monitoring across the WIPP site intensified following the first reports of radiation detection underground to determine the extent of impact to WIPP personnel, the public, and the environment. In this paper, the early stage monitoring data collected by an independent monitoring program conducted by the Carlsbad Environmental Monitoring & Research Center (CEMRC) and an oversight monitoring program conducted by the WIPP's management and operating contractor, the Nuclear Waste Partnership (NWP) LLC were utilized to estimate the actual amount of radioactivity released from the WIPP underground. The Am and Pu isotope ratios were measured and used to support the hypothesis that the release came from one drum identified as having breached that represents a specific waste stream with this radionuclide ratio in its inventory. This failed drum underwent a heat and gas producing reaction that overpowered its vent and

  17. Evaluation of the WIPP Project's compliance with the EPA radiation protection standards for disposal of transuranic waste

    International Nuclear Information System (INIS)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M.

    1998-03-01

    The US Environmental Protection Agency's (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP's compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy's (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA's proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA's responses to EEG's comments

  18. WIPP conceptual design report. Addendum D. A report to Holmes and Narver, Inc., Anaheim, California on alternative energy sources for Waste Isolation Pilot Plant, Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    1977-03-01

    This report presents the results of a technical and economic analysis of alternative methods of meeting the energy needs of a proposed Waste Isolation Pilot Plant (WIPP) to be located in southeastern New Mexico. The WIPP is a facility for underground storage of radioactive wastes in a deep salt bed. The report analyzes a total of sixteen possible methods for meeting WIPP energy requirements, consisting of purchased electricity and on-site generation in various combinations from full purchased to full on-site

  19. Chôra

    DEFF Research Database (Denmark)

    Isar, Nicoletta

    2009-01-01

    , for whom "il y a khôra" (there is chôra), Sallis keeps the definite article (the chôra) as an index of certain differentiation in chôra. This article takes as a point of departure Sallis' thesis regarding the manifestation of the chôra, grounded in the manner in which the chôra is apprehended, that is......, as in a dream. Sallis' interpretation opens up the possibility for a new reading of the dialogue, and offers a tool to examine phenomena occurred in the aftermath of the Platonic cosmogony. One of the most fascinating episodes of the afterlife of the Platonic chôra is the Byzantine chôra, presented...

  20. The operative cooperation and nursing in performing airway stent placement under DSA guidance for treating airway stenosis

    International Nuclear Information System (INIS)

    Yan Baojun; Wu Gang; Han Xinwei; Wang Nan; Shi Jin; Si Wenfeng; Wang Kai; Su Ning; Liu Jia; Hai Dandan

    2011-01-01

    Objective: To discuss the key points of the nursing care for effectively performing airway stent placement under DSA monitoring for airway stenosis. Methods: Corresponding nursing care measures were carried out for 118 patients with airway stenosis who were treated with airway stent placement. Results: The symptom of dyspnea was markedly relieved after stent implantation in all 118 patients with airway stenosis. Conclusion: To strengthen the preoperative psychological nursing and operative posture training, to make close postoperative watch on vital signs, to adopt some prevention measures for possible complications and to give necessary medical advises at the time of discharge are very helpful for patient's recovery after the surgery. (authors)

  1. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  2. A probabilistic analysis of a catastrophic transuranic waste hoist accident at the WIPP

    International Nuclear Information System (INIS)

    Greenfield, M.A.; Sargent, T.J.; Stanford Univ., CA

    1993-06-01

    This report builds upon the extensive and careful analyses made by the DOE of the probability of failure of the waste hoist, and more particularly on the probability of failure of a major component, the hydraulic brake system. The extensive fault tree analysis prepared by the DOE was the starting point of the present report. A key element of this work is the use of probability distributions rather than so-called point estimates to describe the probability of failure of an element. One of the authors (MAG) developed the expressions for the probability of failure of the brake system. The second author (TJS) executed the calculations of the final expressions for failure probabilities. The authors hope that this work will be of use to the DOE in its evaluation of the safety of the waste hoist, a key element at the WIPP

  3. Hanford Tank Waste to WIPP - Maximizing the Value of our National Repository Asset

    International Nuclear Information System (INIS)

    Tedeschi, Allan R.; Wheeler, Martin

    2013-01-01

    Preplanning scope for the Hanford tank transuranic (TRU) waste project was authorized in 2013 by the Department of Energy (DOE) Office of River Protection (ORP) after a project standby period of eight years. Significant changes in DOE orders, Hanford contracts, and requirements at the Waste Isolation Pilot Plant (WIPP) have occurred during this time period, in addition to newly implemented regulatory permitting, re-evaluated waste management strategies, and new commercial applications. Preplanning has identified the following key approaches for reactivating the project: qualification of tank inventory designations and completion of all environmental regulatory permitting; identifying program options to accelerate retrieval of key leaking tank T-111; planning fully compliant implementation of DOE Order 413.3B, and DOE Standard 1189 for potential on-site treatment; and re-evaluation of commercial retrieval and treatment technologies for better strategic bundling of permanent waste disposal options

  4. Tracer tests performed in the field for WIPP in southeastern New Mexico

    International Nuclear Information System (INIS)

    Gonzalez, D.D.; Hill, L.R.

    1979-01-01

    A two-well recirculating tracer test began in October, 1979, to define as accurately as possible the hydraulic character of a fractured carbonate aquifer, the Culebra dolomite member of the Rustler Formation at the WIPP site in Eddy and Lee Counties, New Mexico. The Culebra dolomite overlies a zone planned for isolation of transuranic contaminated waste generated by the United States defense programs. The storage zone of the proposed facility is in nearly pure halite and about 1400 feet (427 meters) below the Culebra dolomite, the most likely pathway for the migration of radionuclides to the biosphere in the event the repository is breached by groundwater. Included in the definition of the hydraulic character of the Culebra aquifer are natural groundwater velocities, aquifer porosity and components of dispersivity. The proposed tracer test using sodium benzoate, a homologous series of chlorofluoromethanes and pentafluorobenzoic acid as tracers is described. Results of the test will be reported at a later date

  5. In situ testing of titanium and mild steel nuclear waste containers at the WIPP site

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1990-01-01

    An overview of the Waste Isolation Pilot Plant (WIPP) in situ tests on the corrosion of titanium and mild steel for high level waste containers is presented. The tests at Sandia have moved out of the laboratory into a test underground facility in order to evaluate the performance of the waste package material. The tests are being performed under both near-reference and accelerated salt repository conditions. Some containers are filled with high level waste glass (non-radioactive); others contain electric heaters. Backfill material is either bentonite/sand or crushed salt. In other tests metals and glasses are exposed directly to brine. The tests are designed to study the corrosion and metallurgy of the canister and overpack materials; the feasibility and performance of backfill materials; and near-field effects such as brine migration

  6. Hanford Tank Waste to WIPP - Maximizing the Value of our National Repository Asset

    Energy Technology Data Exchange (ETDEWEB)

    Tedeschi, Allan R.; Wheeler, Martin

    2013-11-11

    Preplanning scope for the Hanford tank transuranic (TRU) waste project was authorized in 2013 by the Department of Energy (DOE) Office of River Protection (ORP) after a project standby period of eight years. Significant changes in DOE orders, Hanford contracts, and requirements at the Waste Isolation Pilot Plant (WIPP) have occurred during this time period, in addition to newly implemented regulatory permitting, re-evaluated waste management strategies, and new commercial applications. Preplanning has identified the following key approaches for reactivating the project: qualification of tank inventory designations and completion of all environmental regulatory permitting; identifying program options to accelerate retrieval of key leaking tank T-111; planning fully compliant implementation of DOE Order 413.3B, and DOE Standard 1189 for potential on-site treatment; and re-evaluation of commercial retrieval and treatment technologies for better strategic bundling of permanent waste disposal options.

  7. On the road to WIPP: Or remote packaging of transuranic waste

    International Nuclear Information System (INIS)

    Ledbetter, J.M.; Field, L.R.

    1994-01-01

    At the Los Alamos National Laboratory (LANL) Hot Cell facility, highly productive programs in reactor research spanning three decades have generated appreciable quantities of legacy waste. Hot cell capability had become virtually useless due to the storage of this waste. As a result of concentrated efforts by LANL staff, in cooperation with Westinghouse Waste Isolation Pilot Plant (WIPP), a solution was arrived at that allowed the facility to become productive once again. Equipment has been designed and fabricated to remotely handle 55-gal. waste drums, load waste canisters, perform canister weld closure, leak test welds, grapple the waste canister and transport the canister to an interim storage site. It is our contention that the technology and acquired equipment produced from this effort should be used to further benefit other DOE sites

  8. Basic data report for drillhole ERDA 6 (Waste Isolation Pilot Plant - WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    ERDA 6 was drilled in eastern Eddy County, New Mexico, to investigate a candidate site for a nuclear waste repository. The site was subsequently rejected on the basis of geological data. ERDA 6 was drilled in the NE 1/4 SE 1/4, section 35, T21S,R31E. The borehole encountered, from top to bottom, 17 ft of Quaternary deposits, 55 ft of the Triassic Santa Rosa Sandstone, 466 ft of the Dewey Lake Red Beds, 273 ft of the Rustler Formation, 1785.5 ft of the Salado Formation and 374.5 ft of the upper Castile Formation, all of Permian age. Cores or drill cuttings were taken throughout the hole. A suite of wireline geophysical logs was run to a depth of 883 ft to facilitate the recognition and correlation of rock units, to assure identification of major lithologies and to provide depth determinations independent of drill-pipe measurements. The site at ERDA 6 was rejected because the structure of the lower Salado and the Castile is too severe to develop a repository along a single set of beds. The borehole also intersected a reservoir of pressurized brine and gas at about 2710'. The pore volume for the reservoir was estimated to be in the range from about 200,000 to about 2 million barrels. ERDA 6 was re-entered in 1981 by the Department of Energy (DOE) for the purpose of further testing the brine reservoir. Those tests are described in separate reports by the DOE and its contractors. The WIPP is a demonstration facility for the disposal of transuranic (TRU) waste from defense programs. The WIPP will also provide a research facility to investigate the interactions between bedded salt and high level wastes.

  9. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  10. Probability of failure of the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Greenfield, M.A.; Sargent, T.J.; Stanford Univ., CA

    1998-01-01

    In its most recent report on the annual probability of failure of the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP), the annual failure rate is calculated to be 1.3E(-7)(1/yr), rounded off from 1.32E(-7). A calculation by the Environmental Evaluation Group (EEG) produces a result that is about 4% higher, namely 1.37E(-7)(1/yr). The difference is due to a minor error in the US Department of Energy (DOE) calculations in the Westinghouse 1996 report. WIPP's hoist safety relies on a braking system consisting of a number of components including two crucial valves. The failure rate of the system needs to be recalculated periodically to accommodate new information on component failure, changes in maintenance and inspection schedules, occasional incidents such as a hoist traveling out-of-control, either up or down, and changes in the design of the brake system. This report examines DOE's last two reports on the redesigned waste hoist system. In its calculations, the DOE has accepted one EEG recommendation and is using more current information about the component failures rates, the Nonelectronic Parts Reliability Data (NPRD). However, the DOE calculations fail to include the data uncertainties which are described in detail in the NPRD reports. The US Nuclear Regulatory Commission recommended that a system evaluation include mean estimates of component failure rates and take into account the potential uncertainties that exist so that an estimate can be made on the confidence level to be ascribed to the quantitative results. EEG has made this suggestion previously and the DOE has indicated why it does not accept the NRC recommendation. Hence, this EEG report illustrates the importance of including data uncertainty using a simple statistical example

  11. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  12. WIPP Hydrology Program Waste Isolation Pilot Plant southeastern New Mexico. Hydrologic data report No. 2

    International Nuclear Information System (INIS)

    1985-12-01

    This report contains basic hydrologic data for aquifer tests and water-level measurements conducted at the Waste Isolation Pilot Plant (WIPP) site over the period 1983 through November 1985. Part A summarizes data collected during a series of pumping and slug tests conducted during 1983 and 1984 in wells at the H-2 and H-9 hydropads, and in well H-12. Water-level data collected in 1983 and 1984 at the H-2 hydropads and Appendixes tabulate water-level, drawdown, millivolt, and pressure data collected with automated Data Acquisition Systems (DAS's) during the aquifer tests for both the test wells and the observation wells, and water-level data collected with electric water-level sounders. Part B is a detailed presentation of pumping tests conducted at the H-11 hydropad in May and June, 1985. Part B discusses the automated DAS, water-level measurement devices, the discharge measurement system, well and equipment configurations, and provides plots of pressure or water-level response in both the pumping and observation wells. Pressure data collected with the DAS, depth to water collected with the water-level sounders in observation wells, and measured pumping rate data are tabulated. Part C presents January through November, 1985 water-level data collected from wells in the observation-well network at and near the WIPP site. The types of devices utilized are discussed and the water-level plots obtained from the water-level data for the Magenta, the Culebra, the Rustler-Salado contact zone, the Bell Canyon Formation, and the Salado/Castile Formations are presented. Water levels are tabulated

  13. Preoperational radiation surveillance of the WIPP project by EEG during 1992

    International Nuclear Information System (INIS)

    Kenney, J.W.

    1994-02-01

    The purpose of the EEG preoperational monitoring program is to document the existing concentrations of selected radionuclides in various environmental media collected from the vicinity of the WIPP site to provide a basis of comparison of any effects of future WT-PP operations. The basic methodology for conducting environmental surveillance both on-site and off-site was outlined by Spiegler (1984). This report represents a continuation of the EEG baseline data beginning in 1985, previously reported in EEG-43, EEG-47, EEG-49 and EEG-51. Such radionuclide baseline data are important in order to determine whether future WIPP operations with radioactive waste have affected concentrations of these radionuclides in the environment. EEG data are consistent with similar environmental measurements obtained by DOE beginning in 1985. Since late 1985, the EEG has collected or received as split samples 2 443 air filters with particulates, 202 water samples, 16 biota samples and 13 soil/sediment samples. A total of 5,946 specific radionuclide analyses have been performed on these samples. As reported previously by EEG (EEG-43, EEG-47, EEG-49 and EEG-51), observed concentrations of U-238 daughter radionuclides were not in equilibrium with the parent radionuclide in water samples. This observation is consistent with different radionuclide mobility in the environment. In a notice of proposed rule making for 40 CFR 141 (US EPA 1991), the Environmental Protection Agency (EPA) National Primary Drinking Water Regulations reflect this in the calculated activity-to-mass ratio of 1.3 pCi/μg of uranium using a geometric mean of the U-234:U-238 ratio in water supplies of 2.7. Ra-226 and Ra- 228 were reported in a number of water samples in concentrations similar to those previously published by EEG and DOE

  14. Structural evaluation of WIPP disposal room raised to clay seam G

    International Nuclear Information System (INIS)

    Park, Byoung Yoon; Holland, John F.

    2007-01-01

    An error was discovered in the ALGEBBRA script used to calculate the disturbed rock zone around the disposal room and the shear failure zone in the anhydrite layers in the original version. To correct the error, a memorandum of correction was submitted according to the Waste Isolation Pilot Plant (WIPP) Quality Assurance program. The recommended course of action was to correct the error, to repeat the post-process, and to rewrite Section 7.4, 7.5, 8, and Appendix B in the original report. The sections and appendix revised by the post-process using the corrected ALGEBRA scripts are provided in this revision. The original report summarizes a series of structural calculations that examine effects of raising the WIPP repository horizon from the original design level upward 2.43 meters. Calculations were then repeated for grid changes appropriate for the new horizon raised to Clay Seam G. Results are presented in three main areas: (1) Disposal room porosity, (2) Disturbed rock zone characteristics, and (3) Anhydrite marker bed failure. No change to the porosity surface for the compliance re-certification application is necessary to account for raising the repository horizon, because the new porosity surface is essentially identical. The disturbed rock zone evolution and devolution are charted in terms of a stress invariant criterion over the regulatory period. This model shows that the propagation of the DRZ into the surrounding rock salt does not penetrate through MB 139 in the case of both the original horizon and the raised room. Damaged salt would be expected to heal in nominally 150 years. The shear failure does not occur in either the upper or lower anhydrite layers at the moment of excavation, but appears above and below the middle of the pillar one day after the excavation. The damaged anhydrite is not expected to heal as the salt in the DRZ is expected to

  15. Basic data report for drillhole ERDA 9 (Waste Isolation Pilot Plant WIPP)

    International Nuclear Information System (INIS)

    1983-01-01

    ERDA 9 was drilled in eastern Eddy County, New Mexico, to investigate and test salt beds for the disposal of nuclear wastes. The hole was placed near the SE corner of section 20, T22S,R31E. It was drilled between April 28 and June 4, 1976, to a depth of 2889 ft (measured from a kelly bushing altitude of 3,420.4 ft MSL). The borehole encountered, from top to bottom, Holocene deposits (including artificial fill) of 22 ft, the Pleistocene Mescalero Caliche (5 ft) and Gatuna Formation (27 ft), 9 ft of the Triassic Santa Rosa Sandstone, and 487 ft of the Dewey Lake Red Beds, 290 ft of the Rustler Formation, 1976 ft of the Salado Formation and 53 ft of the Castile Formation, all of Permian age. Cuttings were collected at 5-ft intervals for the land surface to a depth of 1090 ft, and consecutive cores were taken to a depth of 2876.6 ft. A suite of wireline geophysical logs was run the full length of the borehole to measure distribution of radioactive elements and hydrogen, and variations in rock density and elastic velocity. On the basis of the borehole findings and related hydrological and geophysical programs, the site was judged suitable to pursue the extensive geological characterization program which followed. The core from ERDA 9 provided a suite of samples extensively tested for rock mechanics, physical properties, and mineralogy. Drill-stem tests in ERDA 9 indicated no significant fluids or permeability in the Salado beds of interest. The WIPP is a demonstration facility for the disposal of transuranic (TRU) waste from defense programs. The WIPP will also provide a research facility to investigate the interactions between bedded salt and high level wastes

  16. Basic data report for drillhole ERDA 6 (Waste Isolation Pilot Plant - WIPP)

    International Nuclear Information System (INIS)

    1983-01-01

    ERDA 6 was drilled in eastern Eddy County, New Mexico, to investigate a candidate site for a nuclear waste repository. The site was subsequently rejected on the basis of geological data. ERDA 6 was drilled in the NE 1/4 SE 1/4, section 35, T21S,R31E. The borehole encountered, from top to bottom, 17 ft of Quaternary deposits, 55 ft of the Triassic Santa Rosa Sandstone, 466 ft of the Dewey Lake Red Beds, 273 ft of the Rustler Formation, 1785.5 ft of the Salado Formation and 374.5 ft of the upper Castile Formation, all of Permian age. Cores or drill cuttings were taken throughout the hole. A suite of wireline geophysical logs was run to a depth of 883 ft to facilitate the recognition and correlation of rock units, to assure identification of major lithologies and to provide depth determinations independent of drill-pipe measurements. The site at ERDA 6 was rejected because the structure of the lower Salado and the Castile is too severe to develop a repository along a single set of beds. The borehole also intersected a reservoir of pressurized brine and gas at about 2710'. The pore volume for the reservoir was estimated to be in the range from about 200,000 to about 2 million barrels. ERDA 6 was re-entered in 1981 by the Department of Energy (DOE) for the purpose of further testing the brine reservoir. Those tests are described in separate reports by the DOE and its contractors. The WIPP is a demonstration facility for the disposal of transuranic (TRU) waste from defense programs. The WIPP will also provide a research facility to investigate the interactions between bedded salt and high level wastes

  17. ECG-triggered non-contrast-enhanced MR angiography (TRANCE) versus digital subtraction angiography (DSA) in patients with peripheral arterial occlusive disease of the lower extremities

    Energy Technology Data Exchange (ETDEWEB)

    Gutzeit, Andreas [Cantonal Hospital Winterthur, Department of Radiology, Winterthur (Switzerland); Paracelsus Medical University Salzburg, Department of Radiology, Salzburg (Austria); Sutter, Reto [Cantonal Hospital Winterthur, Department of Radiology, Winterthur (Switzerland); University Hospital Balgrist, Department of Radiology, Zurich (Switzerland); Froehlich, Johannes M.; Roos, Justus E.; Sautter, Thomas; Schoch, Erik; Giger, Barbara; Weymarn, Constantin von; Binkert, Christoph A. [Cantonal Hospital Winterthur, Department of Radiology, Winterthur (Switzerland); Wyss, Michael [University and ETH Zurich, Institute for Biomedical Engineering, Zurich (Switzerland); Graf, Nicole [University Hospital of Zurich, Clinical Trials Center, Center for Clinical Research, Zurich (Switzerland); Jenelten, Regula [Cantonal Hospital Winterthur, Department of Angiology, Winterthur (Switzerland); Hergan, Klaus [Paracelsus Medical University Salzburg, Department of Radiology, Salzburg (Austria)

    2011-09-15

    To prospectively determine the diagnostic value of electrocardiography-triggered non-contrast-enhanced magnetic resonance angiography (TRANCE) of the lower extremities including the feet versus DSA. All 43 patients with symptomatic peripheral arterial occlusive disease (PAOD) underwent TRANCE before DSA. Quality of MRA vessel depiction was rated by two independent radiologists on a 3-point scale. Arterial segments were graded for stenoses using a 4-point scale (grade 1: no stenosis; grade 2: moderate stenosis; grade 3: severe stenosis; grade 4: occlusion). Findings were compared with those of DSA. In the 731 vessel segments analysed, intra-arterial DSA revealed 283 stenoses: 33.6% moderate, 16.6% severe and 49.8% occlusions. TRANCE yielded a mean sensitivity, specificity, positive and negative predictive value and diagnostic accuracy to detect severe stenoses or occlusions of 95.6%, 97.4%, 87.2%, 99.2%, 97.1% for the thigh segments and 95.2%, 87.5%, 83.2%, 96.6%, 90.5% for the calf segments. Excellent overall image quality was observed for TRANCE in 91.4% versus 95.7% (DSA) for the thigh and in 60.7% versus 91.0% for the calves, while diagnostic quality of the pedal arteries was rated as insufficient. TRANCE achieves high diagnostic accuracy in the thigh and calf regions, whereas the pedal arteries showed limited quality. (orig.)

  18. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 7: Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards.

  19. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  20. Fluid injection for salt water disposal and enhanced oil recovery as a potential problem for the WIPP: Proceedings of a June 1995 workshop and analysis

    International Nuclear Information System (INIS)

    Silva, M.K.

    1996-08-01

    The Waste Isolation Pilot Plant (WIPP) is a facility of the U.S. Department of Energy (DOE), designed and constructed for the permanent disposal of transuranic (TRU) defense waste. The repository is sited in the New Mexico portion of the Delaware Basin, at a depth of 655 meters, in the salt beds of the Salado Formation. The WIPP is surrounded by reserves and production of potash, crude oil and natural gas. In selecting a repository site, concerns about extensive oil field development eliminated the Mescalero Plains site in Chaves County and concerns about future waterflooding in nearby oil fields helped eliminate the Alternate II site in Lea County. Ultimately, the Los Medanos site in Eddy County was selected, relying in part on the conclusion that there were no oil reserves at the site. For oil field operations, the problem of water migrating from the injection zone, through other formations such as the Salado, and onto adjacent property has long been recognized. In 1980, the DOE intended to prohibit secondary recovery by waterflooding in one mile buffer surrounding the WIPP Site. However, the DOE relinquished the right to restrict waterflooding based on a natural resources report which maintained that there was a minimal amount of crude oil likely to exist at the WIPP site, hence waterflooding adjacent to the WIPP would be unlikely. This document presents the workshop presentations and analyses for the fluid injection for salt water disposal and enhanced oil recovery utilizing fluid injection and their potential effects on the WIPP facility

  1. Renal Transplant Patients Biopsied for Cause and Tested for C4d, DSA, and IgG Subclasses and C1q: Which Humoral Markers Improve Diagnosis and Outcomes?

    Science.gov (United States)

    Cicciarelli, James C.; Chang, Youngil; Koss, Michael; Hacke, Katrin; Kasahara, Noriyuki; Burns, Kevin M.; Min, David I.; Naraghi, Robert; Shah, Tariq

    2017-01-01

    The association between donor specific antibodies (DSA) and renal transplant rejection has been generally established, but there are cases when a DSA is present without rejection. We examined 73 renal transplant recipients biopsied for transplant dysfunction with DSA test results available: 23 patients diffusely positive for C4d (C4d+), 25 patients focally positive for C4d, and 25 patients negative for C4d (C4d−). We performed C1q and IgG subclass testing in our DSA+ and C4d+ patient group. Graft outcomes were determined for the C4d+ group. All 23 C4d+ patients had IgG DSA with an average of 12,500 MFI (cumulative DSA MFI). The C4d− patients had average DSA less than 500 MFI. Among the patients with C4d+ biopsies, 100% had IgG DSA, 70% had C1q+ DSA, and 83% had complement fixing IgG subclass antibodies. Interestingly, IgG4 was seen in 10 of the 23 recipients' sera, but always along with complement fixing IgG1, and we have previously seen excellent function in patients when IgG4 DSA exists alone. Cumulative DSA above 10,000 MFI were associated with C4d deposition and complement fixation. There was no significant correlation between graft loss and C1q positivity, and IgG subclass analysis seemed to be a better correlate for complement fixing antibodies in the C4d+ patient group. PMID:28182088

  2. Instrumentation of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Munson, D.E. [Sandia National Labs., Albuquerque, NM (United States). Repository Isolation Systems Div.; Hoag, D.L.; Blankenship, D.A.; DeYonge, W.F.; Schiermeister, D.M. [RE/SPEC, Inc., Albuquerque, NM (United States); Jones, R.L.; Baird, G.T. [Tech Reps, Inc., Albuquerque, NM (United States)

    1997-04-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories had the responsibility for the experimental activities at the WIPP and fielded several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The instrumentation of these tests involved the placement of over 4,200 gages including room closure gages, borehole extensometers, stress gages, borehole inclinometers, fixed reference gages, borehole strain gages, thermocouples, thermal flux meters, heater power gages, environmental gages, and ventilation gages. Most of the gages were remotely read instruments that were monitored by an automated data acquisition system, but manually read instruments were also used to provide early deformation information and to provide a redundancy of measurement for the remote gages. Instruments were selected that could operate in the harsh environment of the test rooms and that could accommodate the ranges of test room responses predicted by pretest calculations. Instruments were tested in the field prior to installation at the WIPP site and were modified to improve their performance. Other modifications were made to gages as the TSI tests progressed using knowledge gained from test maintenance. Quality assurance procedures were developed for all aspects of instrumentation including calibration, installation, and maintenance. The instrumentation performed exceptionally well and has produced a large quantity of quality information.

  3. Instrumentation of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Munson, D.E.; Jones, R.L.; Baird, G.T.

    1997-04-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories had the responsibility for the experimental activities at the WIPP and fielded several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The instrumentation of these tests involved the placement of over 4,200 gages including room closure gages, borehole extensometers, stress gages, borehole inclinometers, fixed reference gages, borehole strain gages, thermocouples, thermal flux meters, heater power gages, environmental gages, and ventilation gages. Most of the gages were remotely read instruments that were monitored by an automated data acquisition system, but manually read instruments were also used to provide early deformation information and to provide a redundancy of measurement for the remote gages. Instruments were selected that could operate in the harsh environment of the test rooms and that could accommodate the ranges of test room responses predicted by pretest calculations. Instruments were tested in the field prior to installation at the WIPP site and were modified to improve their performance. Other modifications were made to gages as the TSI tests progressed using knowledge gained from test maintenance. Quality assurance procedures were developed for all aspects of instrumentation including calibration, installation, and maintenance. The instrumentation performed exceptionally well and has produced a large quantity of quality information

  4. Extent of the Disturbed Rock Zone Around a WIPP Disposal Room

    Science.gov (United States)

    Herrick, C. G.; Park, B. Y.; Holcomb, D. J.

    2008-12-01

    The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, is operated by the U.S. Department of Energy (DOE) as the underground disposal facility for transuranic (TRU) nuclear waste. It is located in a bedded salt formation at a depth of about 650 m. Salt at this depth behaves as a viscous material having an initially lithostatic state of stress. Mining of an opening disturbs the static equilibrium to a degree where fracturing of the rock surrounding a room occurs, changing its mechanical and hydrologic properties. This disturbed rock zone (DRZ) is an important geomechanical feature included in the performance assessment process models used to predict future repository conditions as a part of certification by the EPA as meeting regulatory compliance. Based on ongoing scientific investigations and evaluation of published data since the original certification in 1998, our understanding of the DRZ has continued to progress. Three deformation processes are activated as deviatoric stresses are induced upon excavation of a room in a salt formation: (1) elastic response, (2) inelastic viscoplastic flow, and (3) inelastic- damage induced flow. Damage, the least understood of these processes, is manifested by the time- dependent initiation, growth, coalescence, and healing of microfractures with a deviatoric stress state. Since the ability to model the spatial and temporal changes in salt damage is not available at this time, various means to measure it have been attempted. At the WIPP, for this study, we used sonic velocity measurements obtained over a 12 year period as the principal field method to describe the extent of the DRZ. Predictions of the DRZ extent based on these experimental results are substantiated by permeability measurements and microfracture density analysis from other places in the repository. Extensive laboratory salt creep data demonstrate that damage can be assessed in terms of volumetric strain and principal stresses. Stress states

  5. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    International Nuclear Information System (INIS)

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-01-01

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and

  6. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2002-01-01

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  7. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-10-09

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and

  8. WIPP Hydrology Program: Waste Isolation Pilot Plant, southeastern New Mexico, Hydrologic Data Report No. 5: Parts, A-WIPP-13 multipad test; B-H-4c, P-17, ERDA-9, and Cabin Baby-1 slug tests; C-Engle and Carper well pumping tests; D-WIPP-12, H-14, and H-15 drill-stem tests; E-Water-level data

    International Nuclear Information System (INIS)

    Stensrud, W.A.; Bame, M.A.; Lantz, K.D.; LaVenue, A.M.; Palmer, J.B.; Saulnier, G.J. Jr.

    1987-01-01

    Part A of this report describes the objectives, scope, design, equipment, and methodology for a long-term pumping test conducted at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The test was conducted to provide technical assistance as part of the ongoing hydrologic characterization of the WIPP site. The test is referred to as the northern multipad pumping test, because it was designed to create a hydraulic stress over a wide area of the northern half of the WIPP site. The fluid-pressure and water-level recovery in both pumping and observation wells were monitored for a minimum of 72 days. The test interval was the Culebra Dolomite Member of the Rustler Formation. Twenty-three observation wells completed in the Culebra dolomite were monitored at least once a month as part of the regional water-level monitoring program. Severl wells completed in the Magenta Dolomite Member of the Rustler Formation were monitored during the test to assess the possibility of Magenta-Culebra communication in the expected area of influence of this test. The succeeding sections of this part of Hydrologic Data Report No. 5 present detailed descriptions of the test objectives, pretest data collection, test equipment and test-well configuration, the observation-well network, and test results. 3 refs., 147 figs., 107 tabs

  9. Clinical Experience of Dual-phase Cone Beam Computed Tomography during Hepatic Arteriography to Apply 3D-DSA.

    Science.gov (United States)

    Takao, Yoshinori; Kakimi, Akihiko; Katayama, Yutaka; Sasaki, Shohei; Norimasa, Toshiyo; Izuta, Shinichiro; Himoto, Daisuke; Ichida, Takao

    2016-01-01

    We report on the methods and experiences of the dual-phase cone beam computed tomography during hepatic arteriography (CBCTHA) to apply the 3D-DSA. A total of 32 ml contrast medium (150 mgI/ml) was injected at the rate of 2.0 ml/s for 16 s. The early phase scan was initiated 10 s after the start of contrast media injection. The delayed phase scan was started 40 s after that (24 s after the end of CM injection). When using the dual phase CBCTHA, it was able to obtain the classical hepatocellular carcinoma (HCC) images same as computed tomography during hepatic arteriography (CTHA). In the early phase, the tumor can be highly enhanced against the liver parenchyma. In delayed phase, corona enhancement was clearly appeared at the liver parenchyma. Of 58 cases of acquisitions, we experienced six cases with miss breath holding and 14 cases with over the field of view (FOV) due to hepatomegaly. We evaluated the tumor contrast in 18 cases because the other 40 cases were not applied to our criteria. The pixel values of ROIs on the tumor, coronal enhancement, and liver parenchyma were measured, respectively. Then, we calculated tumor-parenchyma contrast (T-P contrast), corona-tumor contrast (C-T contrast), and corona-parenchyma contrast (C-P contrast). The T-P contrast was 358±112, the C-T contrast was 132±51, and the C-P contrast was 168±66. The contrast was clearly visualized among them. The dual-phase CBCTHA that applies the 3D-DSA is a simple and useful technique for hepatocellular carcinoma treatment.

  10. Evaluation of angiographic delayed vasospasm due to ruptured aneurysm in comparison with cerebral circulation time measured by IA-DSA

    Energy Technology Data Exchange (ETDEWEB)

    Okada, Yoshikazu; Shima, Takeshi; Nishida, Masahiro; Yamane, Kanji; Okita, Shinji; Hatayama, Takashi; Yoshida, Akira; Naoe, Yasutaka; Shiga, Naoko (Chugoku Rosai Hospital, Hiroshima (Japan))

    1994-05-01

    Delayed vasospasm due to ruptured aneurysm has been basically evaluated by angiographic changes in contrast to clinical features such as delayed ischemic neurological deficits (DIND). However, the discrepancies between angiographic and clinical findings have been pointed out. In this study, angiographic changes and cerebral circulation time in ruptured aneurysms were simultaneously investigated with IA-DSA. Thirty-two patients, who had ruptured aneurysms at the anterior circle of Willis and neck clippings at the acute stage, were investigated. Carotid angiogram was performed with IA-DSA on the 7-13th day after the attack. Angiographic changes were evaluated by Fischer's classification and circulation time was calculated in the following way. A time-density curve was obtained at the two ROI's: the C3-C4 portion and the rolandic vein. Circulation time was defined by the difference between the time showing peak optical density at the carotid and the venous portion. The control value of this circulation time obtained from 20 cases with non-rupture aneurysm and epilepsy was 3.4 sec (53 year old) on the average. X-ray CT scan examination was performed at the same time and clinical features were observed every day. Angiographically, 3 cases were free from vasospasm, 18 cases were found to present slight to moderate vasospasm, and 11 cases showed severe vasospasm. Circulation time in patients with no spasm was 3.6 seconds, in patients with slight to moderate vasospasm it was 4.3 seconds and in patients with severe vasospasm it was 6.8 seconds. Ten patients showing cerebral infarction on CT scans demonstrated significantly long circulation time, 7.0 seconds on the average. And all patients having severe vasospasm with circulation time more than 6 seconds presented DIND such as hemiparesis. (author).

  11. Mesa redonda: Argentina en proyectos globales de investigaciones espaciales y astronómicas. Uso científico de la Antena de Espacio Profundo DSA 3

    Science.gov (United States)

    Colazo, M.

    2016-08-01

    Argentine has 10 percent of the operative time available for the DSA 3 Antenna of the European Space Agency, installed in Malargüe, Mendoza. Here we present the history of the project and the current activities for the scientific use of the antenna.

  12. Review comments on Environmental Analysis Cost Reduction Proposals (WIPP-DOE-136), July 1982

    International Nuclear Information System (INIS)

    Channell, J.K.

    1982-11-01

    The cost reduction proposals have the laudable goal of significantly reducing the total capital And operating cost connected with WIPP. Furthermore, since the proposed changes would reduce the size and operating rate of the project, they would be expected to have decreased environmental And socioeconomic impacts. However, some of these cost reduction proposals do decrease factors of safety in various components of the project or trade off one type of environmental detriment for another. The report does not contain sufficient detail to justify all of the conclusions reached; more discussion and quantitative information (including costs) is necessary in some cases. Also, there are places where the report is unclear or contradictory. Without a more detailed evaluation, EEG is unable to conclude that each of these cost reduction proposals either has a net environmental/health and safety benefit or a cost savings that justifies a net detriment. A revised Environmental Analysis (EA) should either include additional information or specifically reference backup documents where these conclusions have been justified. In addition, the EA needs to be revised to include the effect of the recently announced (11/18/82) decision by DOE to relocate the underground waste storage areas of the repository to the south

  13. Background radiation measurements at the Waste Isolation Pilot Plant (WIPP) Site, Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    Minnema, D.M.; Brewer, L.W.

    1983-09-01

    A series of background radiation measurements was performed at the Waste Isolation Pilot Plant (WIPP) Site, Carlsbad, New Mexico. The survey consisted of gross gamma and gamma spectral measurements of the radiation fields, soil and salt grab sample gamma analysis, and radon and working level measurements. The survey included locations at the surface and also within the mine itself. Background radiation levels on the surface were measured to average 7.65 microR/hour, and 0.7 microR/hour within the mine. Radon and working levels were at or below detection levels at all locations, and the radon concentration was estimated to be about 0.01 pCi/liter on the surface based on spectral measurements. The spectral measurements were performed using an intrinsic germanium spectrometer, and calculations from the spectra indicated that potassium-40 contributed about 28% to the surface level dose rates, natural uranium daughters contributed about 64%, and cesium-137 from weapons testing fallout contributed about 8%. In the mine potassium-40 was the only identifiable contributor to the dose rate

  14. Basic data report for drillholes at the H-11 complex (Waste Isolation Pilot Plant-WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Mercer, J.W. (Sandia National Labs., Albuquerque, NM (USA)); Snyder, R.P. (Geological Survey, Denver, CO (USA))

    1990-05-01

    Drillholes H-11b1, H-11b2, and H-11b3 were drilled from August to December 1983 for site characterization and hydrologic studies of the Culebra Dolomite Member of the Upper Permian Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. In October 1984, the three wells were subjected to a series of pumping tests designed to develop the wells, provide information on hydraulic communication between the wells, provide hydraulic properties information, and to obtain water samples for quality of water measurements. Based on these tests, it was determined that this location would provide an excellent pad to conduct a convergent-flow non-sorbing tracer test in the Culebra dolomite. In 1988, a fourth hole (H-11b4) was drilled at this complex to provide a tracer-injection hole for the H-11 convergent-flow tracer test and to provide an additional point at which the hydraulic response of the Culebra H-11 multipad pumping test could be monitored. A suite of geophysical logs was run on the drillholes and was used to identify different lithologies and aided in interpretation of the hydraulic tests. 4 refs., 6 figs., 6 tabs.

  15. Basic data report for drillholes at the H-11 complex (Waste Isolation Pilot Plant-WIPP)

    International Nuclear Information System (INIS)

    Mercer, J.W.; Snyder, R.P.

    1990-05-01

    Drillholes H-11b1, H-11b2, and H-11b3 were drilled from August to December 1983 for site characterization and hydrologic studies of the Culebra Dolomite Member of the Upper Permian Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. In October 1984, the three wells were subjected to a series of pumping tests designed to develop the wells, provide information on hydraulic communication between the wells, provide hydraulic properties information, and to obtain water samples for quality of water measurements. Based on these tests, it was determined that this location would provide an excellent pad to conduct a convergent-flow non-sorbing tracer test in the Culebra dolomite. In 1988, a fourth hole (H-11b4) was drilled at this complex to provide a tracer-injection hole for the H-11 convergent-flow tracer test and to provide an additional point at which the hydraulic response of the Culebra H-11 multipad pumping test could be monitored. A suite of geophysical logs was run on the drillholes and was used to identify different lithologies and aided in interpretation of the hydraulic tests. 4 refs., 6 figs., 6 tabs

  16. Review of the scientific and technical criteria for the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1984-01-01

    The panel has evaluated the scientific and technical adequacy of work being done on the Waste Isolation Pilot Plant (WIPP) project to satisfy the charge to the panel set out in Chapter 1. The panel concluded that the scientific work has been carried out with a high degree of professional competence. The panel notes that the geology revealed by shaft sinking and excavation of drifts and the preliminary measurements generally confirm the geologic expectations derived from surface explorations and boreholes. The purity and volume of the salt, the absence of brine pockets at the repository horizon in the areas excavated, the absence of breccia pipes and of toxic gases, and the nearly horizontal bedding of the salt indicate that a repository can be constructed that will meet the geologic criteria for site selection. Thus, the important issues about the geology at the site have been resolved, but there remain some issues about the hydrology and design of the facility that should be resolved before large-scale transuranic (TRU) waste emplacement begins. The panel's conclusions and recommendations regarding the following studies are presented: site selection and characterization; in-situ tests and experiments; waste acceptance criteria; design and construction of underground facilities; and performance assessment. 65 references, 17 figures, 3 tables

  17. Electrochemical oxidation of bio-refractory dye in a simulated textile industry effluent using DSA electrodes in a filter-press type FM01-LC reactor.

    Science.gov (United States)

    Rodríguez, Francisca A; Mateo, María N; Aceves, Juan M; Rivero, Eligio P; González, Ignacio

    2013-01-01

    This work presents a study on degradation of indigo carmine dye in a filter-press type FM01-LC reactor using Sb2O5-doped Ti/IrO2-SnO2 dimensionally stable anode (DSA) electrodes. Micro- and macroelectrolysis studies were carried out using solutions of 0.8 mM indigo carmine in 0.05 M NaCl, which resemble blue denim laundry industrial wastewater. Microelectrolysis results show the behaviour of DSA electrodes in comparison with the behaviour of boron-doped diamond (BDD) electrodes. In general, dye degradation reactions are carried out indirectly through active chlorine generated on DSA, whereas in the case of BDD electrodes more oxidizing species are formed, mainly OH radicals, on the electrode surface. The well-characterized geometry, flow pattern and mass transport of the FM01-LC reactor used in macroelectrolysis experiments allowed the evaluation of the effect of hydrodynamic conditions on the chlorine-mediated degradation rate. Four values of Reynolds number (Re) (93, 371, 464 and 557) at four current densities (50, 100, 150 and 200 A/m2) were tested. The results show that the degradation rate is independent of Re at low current density (50 A/m2) but becomes dependent on the Re at high current density (200 A/m2). This behaviour shows the central role of mass transport and the reactor parameters and design. The low energy consumption (2.02 and 9.04 kWh/m3 for complete discolouration and chemical oxygen demand elimination at 50 A/m2, respectively) and the low cost of DSA electrodes compared to BDD make DSA electrodes promising for practical application in treating industrial textile effluents. In the present study, chlorinated organic compounds were not detected.

  18. The Rustler Formation at the WIPP [Waste Isolations Pilot Plant] site: Report of a workshop on the geology and hydrology of the Rustler Formation as it relates to the WIPP Project

    International Nuclear Information System (INIS)

    Chaturvedi, L.

    1987-02-01

    This workshop contained eight papers characterizing the Rustler Formation at the WIPP site in New Mexico. Four of these reports were processed separately for the data bases. Information contained in the four remaining papers is available in journal articles or in the reports of other conferences and included discussions of ground water flow through the Rustler Formation, the potential migration of leached radionuclides in this rock, the effects of mineral dissolution on the removal of underlying salt deposits, and a possible pathway for radionuclide migration into the biosphere

  19. Densities and species composition of the avifauna of the Los Medanos WIPP site, southeastern New Mexico

    International Nuclear Information System (INIS)

    Ligon, J.D.; Haydock, J.

    1981-01-01

    Data were gathered in various habitat types to determine annual fluctuations in species diversity and relative abundance, breeding densities, reproductive success of White-necked Ravens and Harris Hawks, fall and spring migrant species and to collect voucher specimens for the site. Four Emlen transects were surveyed in four habitat types during the summer of 1980. These transects were used monthly in May, June and July to determine densities of breeding and non-breeding birds. Active White-necked Raven and Harris Hawk nests were located by checking all conspicuous nests. The nests were checked several times during the nesting stage to determine nest success. During 1980, eleven new species and two new families were added to the list of birds seen on or near the WIPP site. The list now totals 133 species representing 38 families. White-necked Raven nesting success was slightly lower in 1980 than in 1979. Average clutch size in 1980 was 5.5, which is 3.5% less than in 1979 and 19% greater than in 1978. The average number of birds fledged per nest was surprisingly similar over the past three years despite fairly large climatic differences. Success of Harris Hawk nesting was very low in the autumn of 1980 due principally to bad weather. The overall density of breeding birds was lower in 1980 than in 1979 in all habitat types. The overall density was also lower in 1980 than in 1978 in all habitat types except mesquite-grassland. Many species showed larger year-to-year fluctuations in numbers. Mourning Dove density, for example, dropped from 76.9 to 11.2 individuals per square kilometer in the hummock-mesquite habitat. Voucher specimens have been collected for 69 of the 133 species seen on the Los Medanos site

  20. Simultaneous Thermal Analysis of WIPP and LANL Waste Drum Samples: A Preliminary Report

    Energy Technology Data Exchange (ETDEWEB)

    Wayne, David M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-10-19

    On Friday, February 14, 2014, an incident in P7R7 of the WIPP underground repository released radioactive material into the environment. The direct cause of the event was a breached transuranic (TRU) waste container, subsequently identified as Drum 68660. Photographic and other evidence indicates that the breach of 68660 was caused by an exothermic event. Subsequent investigations (Britt, 2015; Clark and Funk, 2015; Wilson et al., 2015; Clark, 2015) indicate that the combination of nitrate salts, pH neutralizing chemicals, and organic-based adsorbent represented a potentially energetic mixture. The materials inside the breached steel drum consisted of remediated, 30- to 40-year old, Pu processing wastes from LANL. The contents were processed and repackaged in 2014. Processing activities at LANL included: 1) neutralization of acidic liquid contents, 2) sorption of the neutralized liquid, and 3) mixing of acidic nitrate salts with an absorber to meet waste acceptance criteria. The contents of 68660 and its sibling, 68685, were derived from the same parent drum, S855793. Drum S855793 originally contained ten plastic bags of acidic nitrate salts, and four bags of mixed nitrate and oxalate salts generated in 1985 by Pu recovery operations. These salts were predominantly oxalic acid, hydrated nitrate salts of Mg, Ca, and Fe, anhydrous Na(NO3), and minor amounts of anhydrous and hydrous nitrate salts of Pb, Al, K, Cr, and Ni. Other major components include sorbed water, nitric acid, dissolved nitrates, an absorbent (Swheat Scoop®) and a neutralizer (KolorSafe®). The contents of 68660 are described in greater detail in Appendix E of Wilson et al. (2015)

  1. Scientific studies in support of the Waste Isolation Pilot Plant (WIPP) repository

    International Nuclear Information System (INIS)

    Chu, M.S.Y.; Weart, W.D.

    1996-01-01

    The DOE submitted a Compliance Certification Application for WIPP in october, 1996. A critical part of this application was a Performance Assessment which predicts the cumulative radioactive release to the accessible environment over a time period of 10,000 years. Comparison of this predicted release to the EPA standard shows a comfortable margin of compliance. The scientific understanding that was critical to developing this assessment spans a broad range of geotechnical disciplines, and required a thorough understanding of the site's geology and hydrology. Evaluation of the geologic processes which are active in the site region establishes that there will be no natural breach of site integrity for millions of years, far longer than the 10,000 year regulatory period. Inadvertent human intrusion is, therefore, the only credible scenario to lead to potential radioactive release to the accessible environment. To substantiate this conclusion and to quantify these potential releases from human intrusion, it has been necessary to develop an understanding of the following processes: salt creep and shaft seal efficacy; gas generation from organic decomposition of waste materials and anoxic corrosion of metals in the waste and waste packages; solubilities for actinides in brine; fluid flow in Salado formation rocks, and hydrologic transport of actinides in the overlying dolomite aquifers. Other issues which had to be evaluated to allow definition of breach scenarios were brine reservoir occurrences and their associated reservoir parameters, consequences of mining over the repository, and drilling for natural resources in the vicinity of the repository. Results of all these studies will be briefly summarized in this paper

  2. A conceptual performance assessment model of the dissolved actinide source term for the WIPP

    International Nuclear Information System (INIS)

    Weiner, R.F.; Stockman, C.T.; Wang, Y.; Novak, C.F.

    1996-01-01

    This paper presents a performance assessment model of dissolved actinide concentrations for the Waste Isolation Pilot Plant (WIPP). The model assesses the concentration of each actinide oxidation state and combines these concentrations with an oxidation state distribution. The chemical behavior of actinides in the same oxidation state is presumed to be very similar for almost all situations, but exceptions arising from experimental evidence are accommodated. The code BRAGFLO calculates the gas pressure, brine mass, gas volume, and mass of remaining Fe and cellulosics for each time step and computational cell. The total CO 2 in the repository and dissolved Ca(OH) 2 is estimated. Lookup tables are constructed for pmH and f(CO 2 ) as a function of brine type and volume, moles of CO 2 , and Ca(OH) 2 . Amounts of five soluble complexants are considered. A model based on the formulation of Harvie et al. produces tables of solubilities for each actinide oxidation state as a function of pmH, f(CO 2 ), brine composition, and complexant. Experimental data yield lookup tables of fractions of Th, U, Np, Pu, and Am in each oxidation state as a function of f(CO 2 ) and complexant. The tables are then used to provide a concentration of a particular actinide at particular values of pmH and f(CO 2 ). Under steady-state conditions, the oxidation state of each actinide that is most stable in the particular chemical environment controls the concentration of that actinide in solution. In the absence of steady-state conditions, the oxidation state distribution of interest is that of the dissolved actinide, and the oxidation states may be treated as if they were separate compounds

  3. Waste Isolation Pilot Plant (WIPP) research and development program: in situ testing plan, March 1982

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Christensen, C.L.; Hunter, T.O.; Molecke, M.A.; Munson, D.E.

    1982-12-01

    The WIPP in southeast New Mexico is being developed as an R and D facility to demonstrate the safe disposal of radioactive defense wastes in bedded salt. The tests are done first without radioactive materials and then with transuranic (TRU) waste and Defense High-Level Waste (DHLW). The thermal/structural itneraction experiments include (a) geomechanical evaluations of access drifts, vertical shafts, and isothermal TRU disposal rooms during the Site and Preliminary Validation Program, (b) tests that represent the reference DHLW room configuraton (5.5 m x 5.5 m) and areal thermal loading of 12 W/m 2 , (c) an overtest of the DHLW congfiguration heated to about four times the reference thermal loading; (d) geomechanical evaluations of various room widths up to 9.1 m, variable pillar widths, and a long-drift intersection, (e) an 11-m-dia axisymmetric heated pillar test, and (f) miscellaneous tests to determine stress field and clay seam sliding resistance. The plugging and sealing experiments include (a) salt permeability tests, (b) tests to determine effects of size and scale on behavior of plugs and to determine backfill material behavior and emplacement techniques, and (c) a plug test matrix to evaluate candidate sealing materials. Waste package interaction experiments include (a) simulated-waste package tests that use several design options and engineered barrier materials under reference and accelerated DHLW environments, (b) confirmatory brine migration tests, (c) TRU drum durability tests in dry and wet conditions, (d) options for radiation-source tests using cesium capsules, and (e) actual DHLW tests using up to 40 canisters for technical demonstrations and for addressing concerns of wasteform chemistry, leaching, and near-field radionuclide migration

  4. Chemistry of brines in salt from the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico: a preliminary investigation

    International Nuclear Information System (INIS)

    Stein, C.L.; Krumhansl, J.L.

    1986-03-01

    We present here analyses of macro- and microscopic (intracrystalline) brines observed within the WIPP facility and in the surrounding halite, with interpretations regarding the origin and history of these fluids and their potential effect(s) on long-term waste storage. During excavation, several large fluid inclusions were recovered from an area of highly recrystallized halite in a thick salt bed at the repository horizon (2150 ft below ground level). In addition, 52 samples of brine ''weeps'' were collected from walls of recently excavated drifts at the same stratigraphic horizon from which the fluid inclusion samples are assumed to have been taken. Analyses of these fluids show that they differ substantially in composition from the inclusion fluids and cannot be explained by mixing of the fluid inclusion populations. Finally, holes in the facility floor that filled with brine were sampled but with no stratographic control; therefore it is not possible to interpret the compositions of these brines with any accuracy, except insofar as they resemble the weep compositions but with greater variation in both K/Mg and Na/Cl ratios. However, the Ca and SO 4 values for the floor holes are relatively close to the gypsum saturation curve, suggesting that brines filling floor holes have been modified by the presence of gypsum or anhydrite, possibly even originating in one or more of the laterally continuous anhydrite units referred to in the WIPP literature as marker beds. In conclusion, the wide compositional variety of fluids found in the WIPP workings suggest that (1) an interconnected hydrologic system which could effectively transport radonuclides away from the repository does not exist; (2) brine migration studies and experiments must consider the mobility of intergranular fluids as well as those in inclusions; and (3) near- and far-field radionuclide migration testing programs need to consider a wide range of brine compositions rather than a few reference brines

  5. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    International Nuclear Information System (INIS)

    Best, T.L.; Neuhauser, S.

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed

  6. Rustler Formation in the waste handling and exhaust shafts, Waste Isolation Pilot Plant (WIPP) site, southeastern New Mexico

    International Nuclear Information System (INIS)

    Holt, R.M.; Powers, D.W.

    1987-01-01

    The Permian Rustler Formation was recently examined in detail in two shafts at the WIPP site: the waste handling shaft (waste shaft) and the exhaust shaft. Fresh exposures of the Rustler in the shafts exhibited abundant primary sedimentary structures. The abundance of primary sedimentary structures observed in the shafts is unequaled in previously described sections. Data are reported here in their stratigraphic context as an initial basis for evaluation of depositional environments of the Rustler and reevaluating the role of dissolution in the formation of the Rustler. 10 refs

  7. Pre-WIPP in-situ experiments in salt. Part I. Executive summary. Part II. Program description

    Energy Technology Data Exchange (ETDEWEB)

    Sattler, A.R.; Hunter, T.O.

    1979-08-01

    This document presents plans for in-situ experiments in a specific location in southeastern New Mexico. Schedule and facility design were based on features of a representative local potash mine and on contract negotiations with mine owners. Subsequent WIPP program uncertainties have required a delay in the implementation of the activities discussed here; however, the relative schedule for various activities are appropriate for future planning. The document represents a matrix of in-situ activities to address relevant technical issues prior to the availability of a bedded salt repository.

  8. Pre-WIPP in-situ experiments in salt. Part I. Executive summary. Part II. Program description

    International Nuclear Information System (INIS)

    Sattler, A.R.; Hunter, T.O.

    1979-08-01

    This document presents plans for in-situ experiments in a specific location in southeastern New Mexico. Schedule and facility design were based on features of a representative local potash mine and on contract negotiations with mine owners. Subsequent WIPP program uncertainties have required a delay in the implementation of the activities discussed here; however, the relative schedule for various activities are appropriate for future planning. The document represents a matrix of in-situ activities to address relevant technical issues prior to the availability of a bedded salt repository

  9. Radioactive waste disposal: Waste isolation pilot plants (WIPP). (Latest citations from the NTIS Bibliographic database). Published Search

    International Nuclear Information System (INIS)

    1993-09-01

    The bibliography contains citations concerning the Waste Isolation Pilot Plant (WIPP), a geologic repository located in New Mexico for transuranic wastes generated by the U.S. Government. Articles follow the development of the program from initial site selection and characterization through construction and testing, and examine research programs on environmental impacts, structural design, and radionuclide landfill gases. Existing plants and facilities, pilot plants, migration, rock mechanics, economics, regulations, and transport of wastes to the site are also included. The Salt Repository Project and the Crystalline Repository Project are referenced in separate bibliographies. (Contains a minimum of 228 citations and includes a subject term index and title list.)

  10. Sandia Review of High Bridge Associates Report: Comparison of Plutonium Disposition Alternatives: WIPP Diluted Plutonium Storage and MOX Fuel Irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Shoemaker, Paul E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hardin, Ernest [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Park, HeeHo Daniel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brady, Patrick Vane [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Rechard, Robert P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-08-01

    The subject report from High Bridge Associates (HBA) was issued on March 2, 2016, in reaction to a U.S. Department of Energy (DOE) program decision to pursue down-blending of surplus Pu and geologic disposal at the Waste Isolation Pilot Plant (WIPP). Sandia National Laboratories was requested by the DOE to review the technical arguments presented in the HBA report. Specifically, this review is organized around three technical topics: criticality safety, radiological release limits, and thermal impacts. Questions raised by the report pertaining to legal and regulatory requirements, safeguards and security, international agreements, and costing of alternatives, are beyond the scope of this review.

  11. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    Energy Technology Data Exchange (ETDEWEB)

    Best, T.L.; Neuhauser, S. (eds.)

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

  12. Multimodal imaging in the elastase-induced aneurysm model in rabbits: a comparative study using serial DSA, MRA and CTA

    International Nuclear Information System (INIS)

    Doerfler, A.; Becker, W.; Wanke, I.; Goericke, S.; Oezkan, N.; Forsting, M.

    2004-01-01

    Background and Purpose: The elastase-induced aneurysm model in rabbits has proved to be suitable for testing new endovascular occlusion devices. The purpose of this study was to evaluate different imaging modalities for the depiction of anatomy and size of elastase-induced aneurysms and for serial follow-up imaging. Materials and Methods: Elastase-induced aneurysms were created in eight Chinchilla bastard rabbits by endoluminal incubation of porcine elastase. Serial imaging was performed using intravenous DSA (IVDSA), contrast-enhanced MRA (CEMRA), and time-of-flight MRA (TOF) 14 days, 4 weeks and 3 months after aneurysm creation. Intraarterial DSA (IADSA) and CT angiography (CTA) were performed after 3 months. Aneurysm size and geometry (height H, width W, neck width N) were compared. Results: On IVDSA after two weeks mean aneurysm height was 6.2 mm (range 2.8-11.0 mm), mean aneurysm neck width was 2.7 mm (range 2.0-4.2 mm) and mean aneurysm neck width was 2.7 mm (range 2.0-4.2 mm). We did not observed any statistically significant change in aneurysm dimensions during follow-up at 4 weeks (CEMRA: H: 5.4, W: 2.4, N: 2.4; TOF: H: 5.7, W: 2.4, N: 2.7) and 3 months (CEMRA: H: 5.8, W: 2.6, N: 2.6; TOF: H: 6.9, W: 2.8, N: 3.0). Aneurysm dimensions could be best seen on IADSA (H: 6.2, W: 3.0, N: 2.7) with good correlation to CTA (r=0.94; H: 6.1, W: 2.8, N: 2.6), CE-MRA (r=0.92), and TOF (r=0.97). TOF was superior to CEMRA in delineating the aneurysm wall. Conclusions: Serial imaging using MRA, CTA or intravenous and intraarterial angiography is feasible in the elastase-induced aneurysm model. Contrast-enhanced MRA, TOF-MRA and CTA showed good correlation to IADSA and are all suitable for non-invasive pretherapeutic measurement of aneurysm size. (orig.) [de

  13. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2005-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.

  14. CH Packaging Program Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-03-04

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT Shipping Package, and directly related components. This document complies with the minimum requirements as specified in TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event there is a conflict between this document and the SARP or C of C, the SARP and/or C of C shall govern. C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SAR P charges the WIPP Management and Operation (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize these operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  15. Atmospheric Chemistry of CH3CH2OCH3

    DEFF Research Database (Denmark)

    Andersen, Mads Peter Sulbæk; Bjørn Svendsen, Sissel; Østerstrøm, Freja From

    2017-01-01

    The atmospheric chemistry of methyl ethyl ether, CH3CH2OCH3, was examined using FT-IR/relative-rate methods. Hydroxyl radical and chlorine atom rate coefficients of k(CH3CH2OCH3+OH) = (7.53 ± 2.86) × 10−12 cm3 molecule−1 s−1 and k(CH3CH2OCH3+Cl) = (2.35 ± 0.43) × 10−10 cm3 molecule−1 s−1 were...

  16. Transvenous DSA: ECG-controlled cardial effects and venous complications after pre-atrial injection of nonionic contrast media

    International Nuclear Information System (INIS)

    Arlart, I.P.; Sigel, H.

    1986-01-01

    Transvenous DSA is a diagnostic technique for ambulatory examination that is well tolerated by patients, although it is commonly known that bolus injection of contrast medium for examination of the cardiovascular system may affect the cardiovascular hemodynamic process. The prospective study described was intended to reveal in 100 patients the effects on ECG data, as well as clinical symptoms of non-tolerance of contrast medium (nonionic, with high iodine content, Iopamidol 370), applied by central pre-atrial injection. In addition, catheterization-induced complications in the venous system of the arm were studied in 130 patients. Change of heart rate was the most frequent effect observed (increase in 49% of patients pretreated with Buscopan, decrease in 36% of non-pretreated patients). The second next effects were supraventricular and ventricular ES (20%), minor prolongations of PQ and QRS intervals (14%), and ST lowering (3%), without clinical symptons. In one case, an attack of Angina pectoris was observed, another patient developed a cutane allergy. After catheterization of brachial vein, thromboses were observed in 3% of patients, as well as local inflammations in 6%, short attacks of fever in 2.3%. The complications were observed for the most part in cases where re-sterilised catheters had been used. (orig.) [de

  17. Preservation of artifacts in salt mines as a natural analog for the storage of transuranic wastes at the WIPP repository

    International Nuclear Information System (INIS)

    Martell, M.A.; Hansen, F.; Weiner, R.

    1998-01-01

    Use of nature's laboratory for scientific analysis of complex systems is a largely untapped resource for understanding long-term disposal of hazardous materials. The Waste Isolation Pilot Plant (WIPP) in the US is a facility designed and approved for storage of transuranic waste in a salt medium. Isolation from the biosphere must be ensured for 10,000 years. Natural analogs provide a means to interpret the evolution of the underground disposal setting. Investigations of ancient sites where manmade materials have experienced mechanical and chemical processes over millennia provide scientific information unattainable by conventional laboratory methods. This paper presents examples of these pertinent natural analogs, provides examples of features relating to the WIPP application, and identifies potential avenues of future investigations. This paper cites examples of analogical information pertaining to the Hallstatt salt mine in Austria and Wieliczka salt mine in Poland. This paper intends to develop an appreciation for the applicability of natural analogs to the science and engineering of a long-term disposal facility in geomedia

  18. Solubility and sorption characteristics of uranium(VI) associated with rock samples and brines/groundwaters from WIPP and NTS

    International Nuclear Information System (INIS)

    Dosch, R.G.

    1981-01-01

    Solubility measurements for U(VI) in WIPP-related brines/groundwaters were made using initial U(VI) concentrations in the range of 1 to 50 μg/ml. Distribution coefficients (Kd) for U(VI) were determined for Culebra and Magenta dolomites using four different brine/groundwater compositions and for argillaceous shale and hornfels samples from the Eleana and Calico Hills Formation on NTS using a groundwater simulant typical of that area. The Kd's were evaluated as functions of: (1) U(VI) concentration (1.4 x 10 -4 to 1.4 μg/ml); (2) solution volume-to-rock mass ratios used in the measurements (5 to 100 ml/g), and for WIPP material only; (3) water composition (0 to 100% brine in groundwater); and (4) sample location in the Culebra and Magenta dolomite members of the Rustler Formation. The results indicate that if groundwater intrudes into a repository and leaches a waste form, significant concentrations of dissolved or colloidal U(VI) could be maintained in the liquid phase. Should these solutions enter an aquifer system, there are reasonable sets of conditions which could lead to subsequent migration of U(VI) away from the repository site

  19. Preservation of artifacts in salt mines as a natural analog for the storage of transuranic wastes at the WIPP repository

    Energy Technology Data Exchange (ETDEWEB)

    Martell, M.A.; Hansen, F.; Weiner, R.

    1998-10-01

    Use of nature`s laboratory for scientific analysis of complex systems is a largely untapped resource for understanding long-term disposal of hazardous materials. The Waste Isolation Pilot Plant (WIPP) in the US is a facility designed and approved for storage of transuranic waste in a salt medium. Isolation from the biosphere must be ensured for 10,000 years. Natural analogs provide a means to interpret the evolution of the underground disposal setting. Investigations of ancient sites where manmade materials have experienced mechanical and chemical processes over millennia provide scientific information unattainable by conventional laboratory methods. This paper presents examples of these pertinent natural analogs, provides examples of features relating to the WIPP application, and identifies potential avenues of future investigations. This paper cites examples of analogical information pertaining to the Hallstatt salt mine in Austria and Wieliczka salt mine in Poland. This paper intends to develop an appreciation for the applicability of natural analogs to the science and engineering of a long-term disposal facility in geomedia.

  20. Stochastic analysis of radionuclides travel times at the waste isolation pilot plant (WIPP), in New Mexico (U.S.A.)

    International Nuclear Information System (INIS)

    Capilla Roma, J. E.; Gomez-Hernandez, J. J.; Sahuquillo Herraiz, A.

    1999-01-01

    Multiple equally likely transmissivity fields that honor piezo metric head measurements are generated as input to a Monte-Carlo exercise, for the stochastic analysis of travel times in the Culebra dolomite overlaying the Waste Isolation Pilot Plant (WIPP) in New Mexico, USA. Results of the analysis show the importance of modeling variable-density flow as accurately as possible, and of including as much information as possible in the simulations of alternative scenarios. Results also unveil a channel of high transmissivity when transmissivity fields are conditioned to piezo metric data. This channel leads to important reductions of travel time from the WIPP area to the south boundary. The uncertainty of the boundary conditions is analyzed searching for alternative boundary conditions can be obtained that improve the reproduction of piezo metric data and yield a reduction of the minimum travel times to the south boundary. Results of the Monte-Carlo exercise are compared with those from a deterministic analysis showing the limitations of the latter method when trying to estimate extreme values or characterizing the uncertainty of their predictions. The report ends with a brief study on the impact of the small transmissivity measurements at location P-18, showing that its value is not consistent with the model of spatial variability inferred from the data and that it has an important effect on model predictions. (Author)

  1. Permeability of natural rock salt from the Waste Isolation Pilot Plant (WIPP) during damage evolution and healing

    International Nuclear Information System (INIS)

    Pfeifle, T.W.; Hurtado, L.D.

    1998-06-01

    The US Department of Energy has developed the Waste Isolation Pilot Plant (WIPP) in the bedded salt of southeastern New Mexico to demonstrate the safe disposal of radioactive transuranic wastes. Four vertical shafts provide access to the underground workings located at a depth of about 660 meters. These shafts connect the underground facility to the surface and potentially provide communication between lithologic units, so they will be sealed to limit both the release of hazardous waste from and fluid flow into the repository. The seal design must consider the potential for fluid flow through a disturbed rock zone (DRZ) that develops in the salt near the shafts. The DRZ, which forms initially during excavation and then evolves with time, is expected to have higher permeability than the native salt. The closure of the shaft openings (i.e., through salt creep) will compress the seals, thereby inducing a compressive back-stress on the DRZ. This back-stress is expected to arrest the evolution of the DRZ, and with time will promote healing of damage. This paper presents laboratory data from tertiary creep and hydrostatic compression tests designed to characterize damage evolution and healing in WIPP salt. Healing is quantified in terms of permanent reduction in permeability, and the data are used to estimate healing times based on considerations of first-order kinetics

  2. A review of WIPP [Waste Isolation Pilot Plant] repository clays and their relationship to clays of adjacent strata

    International Nuclear Information System (INIS)

    Krumhansl, J.L.; Kimball, K.M.; Stein, C.L.

    1990-12-01

    The Salado Formation is a thick evaporite sequence located in the Permian Delaware Basin of southeastern New Mexico. This study focuses on the intense diagenetic alteration that has affected the small amounts of clay, feldspar, and quartz washed into the basin during salt deposition. These changes are of more than academic interest since this formation also houses the WIPP (Waste Isolation Pilot Plant). Site characterization concerns warrant compiling a detailed data base describing the clays in and around the facility horizon. An extensive sampling effort was undertaken to address these programmatic issues as well as to provide additional insight regarding diagenetic mechanisms in the Salado. Seventy-five samples were collected from argillaceous partings in halite at the stratigraphic level of the Waste Isolation Pilot Plant (WIPP). These were compared with twenty-eight samples from cores of the Vaca Triste member of the Salado, a thin clastic unit at the top of the McNutt potash zone, and with a clay-rich sample from the lower contact of the Culebra Dolomite (in the overlying Rustler Formation). These settings were compared to assess the influence of differences in brine chemistry (i.e., halite and potash facies, normal to hypersaline marine conditions) and sediment composition (clays, sandy silt, dolomitized limestone) on diagenetic processes. 44 refs., 11 figs., 5 tabs

  3. Stochastic analysis of radionuclides travel times at the waste isolation pilot plant (WIPP), in New Mexico (U. S. A. )

    Energy Technology Data Exchange (ETDEWEB)

    Capilla Roma, J. E.; Gomez-Hernandez, J. J.; Sahuquillo Herraiz, A. (Universidad Politecnia de Valencia (Spain))

    1999-12-15

    Multiple equally likely transmissivity fields that honor piezo metric head measurements are generated as input to a Monte-Carlo exercise, for the stochastic analysis of travel times in the Culebra dolomite overlaying the Waste Isolation Pilot Plant (WIPP) in New Mexico, USA. Results of the analysis show the importance of modeling variable-density flow as accurately as possible, and of including as much information as possible in the simulations of alternative scenarios. Results also unveil a channel of high transmissivity when transmissivity fields are conditioned to piezo metric data. This channel leads to important reductions of travel time from the WIPP area to the south boundary. The uncertainty of the boundary conditions is analyzed searching for alternative boundary conditions can be obtained that improve the reproduction of piezo metric data and yield a reduction of the minimum travel times to the south boundary. Results of the Monte-Carlo exercise are compared with those from a deterministic analysis showing the limitations of the latter method when trying to estimate extreme values or characterizing the uncertainty of their predictions. The report ends with a brief study on the impact of the small transmissivity measurements at location P-18, showing that its value is not consistent with the model of spatial variability inferred from the data and that it has an important effect on model predictions. (Author)

  4. Four-dimensional CT angiography (4D-CTA) in the evaluation of juvenile nasopharyngeal angiofibromas: comparison with digital subtraction angiography (DSA) and surgical findings.

    Science.gov (United States)

    Xiao, Zebin; Zheng, Yingyan; Li, Jian; Chen, Dehua; Liu, Fang; Cao, Dairong

    2017-12-01

    To explore the value of four-dimensional CT angiography (4D-CTA) in the preoperative evaluation of juvenile nasopharyngeal angiofibromas (JNAs) using 320-row volume CT. 4D-CTA and DSA data of 18 patients with histopathologically proven JNAs were retrospectively reviewed. The location, extent, feeding vessels and stage of JNAs were assessed by two radiologists independently and blindly. The agreements between both reviewers and between 4D-CTA and surgical findings for assessing the above indicators were analysed, respectively. The radiation dose and the number of feeding arteries between 4D-CTA and digital subtraction angiography (DSA) were also compared. 4D-CTA showed high diagnostic consistency with surgical pathology for JNAs with consistent rates of 96.2 and 100% in both reviewers, respectively. The effective dose of 4D-CTA was significantly less than that of DSA (p 0.05). 4D-CTA can provide a reliable preoperative diagnosis and assessment of JNAs, which is useful for determining the surgical strategy and management of this condition.

  5. CH Packaging Program Guidance

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-06-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  6. CH Packaging Program Guidance

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2007-12-13

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  7. CH Packaging Program Guidance

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-09-11

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  8. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2006-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant| (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations(CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  9. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2009-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  10. Assessment and treatment planning of lateral intracranial dural arteriovenous fistulas in 3 T MRI and DSA: A detailed analysis under consideration of time-resolved imaging of contrast kinetics (TRICKS) and ce-MRA sequences

    Energy Technology Data Exchange (ETDEWEB)

    Ertl, L.; Brueckmann, H.; Patzig, M.; Brem, C.; Forbrig, R.; Fesl, G. [Ludwig-Maximilians-University, Grosshadern Campus, Department of Neuroradiology, Institute of Clinical Radiology, Munich (Germany); Kunz, M. [Ludwig-Maximilians-University, Grosshadern Campus, Department of Neurosurgery, Munich (Germany)

    2016-12-15

    The current gold standard in the assessment of lateral intracranial dural arteriovenous fistulas (LDAVF) is digital subtraction angiography (DSA). However, magnetic resonance imaging (MRI) is a non-invasive emerging tool for the evaluation of such lesions. The aim of our study was to compare the DSA to our 3 T MR-imaging protocol including a highly spatial resolved (ce-MRA) and a temporal resolved (''time-resolved imaging of contrast kinetics'', TRICKS) contrast-enhanced MR angiography to evaluate if solely DSA can remain the gold-standard imaging modality for the treatment planning of LDAVF. We retrospectively reviewed matched pairs of DSA and 3 T MRI examinations of 24 patients with LDAVF (03/2008-04/2014) by the same list of relevant criteria for an endovascular LDAVF treatment planning. In particular, we determined intermodality agreement for the Cognard classification, the identifeication of arterial feeders, and the detailed assessment of each venous drainage pattern. Intermodality agreement for the Cognard classification was excellent (k = 1.0). Whereas MRI failed in identifying small arterial feeders, it was superior to the DSA in the assessment of the sinus and the venous drainage pattern. The combination of MRI and DSA is the new gold standard in LDAVF treatment planning. (orig.)

  11. A comparison of geostatistically-based inverse techniques for use in performance assessment analyses at the WIPP site results from the Test Case No. 1

    International Nuclear Information System (INIS)

    Zimmerman, D.A.; Gallegos, D.P.

    1992-01-01

    The groundwater flow pathway in the Culebra Dolomite aquifer at the Waste Isolation Pilot Plant (WIPP) has been identified a potentially important pathway for radionuclide migration to the accessible environment. Consequently, uncertainties in the models used to describe flow and transport in the Culebra need to be addressed. A ''Geostatistics Test Problem'' is being developed to evaluate a number of inverse techniques that may be used for Dow calculations in the WIPP performance assessment (PA). The Test Problem is actually a series of test cases, each being developed as a highly complex synthetic data sct; the intent is for the ensemble of these data sets span the range of possible conceptual models of groundwater now at the WIPP site. This paper describes the results from Test Case No. 1. Of the five techniques compared, those based on the linearized form of the groundwater flow equation exhibited less bias and less spread in their GWTT distribution functions; the semi-analytical method had the least bias. While the results are not sufficient to make generalizations about which techniques may be better suited for the WIPP PA (only one test case has been exercised), analyses of the data from this test case provides some indication about the relative importance of other aspects of the flow modeling (besides inverse method or geostatistical approach) in PA. Then ancillary analyses examine the effect of gridding an the effect of boundary conditions on the groundwater travel time estimates

  12. A comparison of real-time radiography results and visual characterization results with emphasis on WIPP WAC and TRAMPAC compliance issues

    International Nuclear Information System (INIS)

    Hailey, S.M.

    1994-01-01

    Visual characterization provides a means of confirming the real-time radiography (RTR) certification process and process knowledge. RTR and visual characterization have been conducted on thirty-three drums containing transuranic (TRU) waste in support of the Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP) at the Idaho National Engineering Laboratory. Argonne National Laboratory - West (ANL-W) detected a small can of liquid in one of these drums during the visual examination, resulting in a WIPP Waste Acceptance Criteria (WIPP-WAC) miscertification. The remaining thirty-two drums were certified correctly by the RTR system at the Stored Waste Examination Pilot Plant (SWEPP) for WIPP-WAC and TRUPACT-II Authorized Methods for Payload Control (TRAMPAC) requirements. TRAMPAC contains restrictions on the weights of specific materials allowed in the waste, based on the shipping category. Items on the restricted list for a given shipping category are allowed in quantities less than 1 percent of the weight of the waste. RTR can estimate the weights of certain broad categories in homogeneous waste forms, however, the capability to estimate weights at the 1 percent level is not presently realistic. Process knowledge forms the basis of conformance to these weight requirements. Visual characterization suggests process knowledge is not completely adequate at this level

  13. Atmospheric chemistry of CF3CH2CH2OH

    DEFF Research Database (Denmark)

    Hurley, Michael D.; Misner, Jessica A.; Ball, James C.

    2005-01-01

    Relative rate techniques were used to study the kinetics of the reactions of Cl atoms and OH radicals with CF3CH2C(O)H and CF3CH2CH2OH in 700 Torr of N-2 or air diluent at 296 2 K. The rate constants determined were k(Cl+CF3CH2C(O)H) = (1.81 +/- 0.27) x 10(-11), k(OH+CF3CH2C(O)H) = (2.57 +/- 0.44...

  14. Proposed waste isolation pilot project (WIPP) and impacts in the state of New Mexico: a socio-economic analysis. Final report

    International Nuclear Information System (INIS)

    Cummings, R.D.; Burness, H.S.; Norton, R.D.

    1981-04-01

    This document is a final report for research conducted concerning the socio-economic impacts in the State of New Mexico that might attend the construction and operation of the proposed Waste Isolation Pilot Plant (WIPP). The proposed site for the WIPP, known as the Los Medanos site, is in Southeastern New Mexico's Eddy County, some 25 miles east of Carlsbad, New Mexico and some 40 miles from Hobbs, New Mexico, in adjacent Lea County. The purpose as set out in the US Department of Energy's environmental impact statements is for storage of TRU waste from the US defense program and the construction of a research and development area for experiments concerning the isolation of all types of nuclear waste in salt. The intended purpose of the study is to identify, measure (when possible) and assess the range of potential socio-economic impacts in the State that may be attributable to the WIPP. Every effort has been made by the authors to approach this task in an objective manner. In efforts to provide an objective analysis of the WIPP, however, particular attention was required in providing a comprehensive review of potential impacts. This means that however unlikely an impact might seem, the authors have purposely avoided pre-judging the potential magnitude of the impact and have applied their best efforts to measure it. On the other hnd, this study is not intended to provide a definitive calculation regarding the net balance of WIPP-related benefits and costs. To help ensure objectivity, two advisory boards, Technical Advisory Board and Public Advisory Board, were formed at the outset of the project for the purpose of providing periodic reviews of research efforts

  15. Development and application of an analysis methodology for interpreting ambiguous historical pressure data in the WIPP gas-generation experiments.

    Energy Technology Data Exchange (ETDEWEB)

    Felicione, F. S.

    2006-01-23

    The potential for generation of gases in transuranic (TRU) waste by microbial activity, chemical interactions, corrosion, and radiolysis was addressed in the Argonne National Laboratory-West (ANL-West) Gas-Generation Experiments (GGE). Data was collected over several years by simulating the conditions in the Waste Isolation Pilot Plant (WIPP) after the eventual intrusion of brine into the repository. Fourteen test containers with various actual TRU waste immersed in representative brine were inoculated with WIPP-relevant microbes, pressurized with inert gases, and kept in an inert-atmosphere environment for several years to provide estimates of the gas-generation rates that will be used in computer models for future WIPP Performance Assessments. Modest temperature variations occurred during the long-term ANL-West experiments. Although the experiment temperatures always remained well within the experiment specifications, the small temperature variation was observed to affect the test container pressure far more than had been anticipated. In fact, the pressure variations were so large, and seemingly erratic, that it was impossible to discern whether the data was even valid and whether the long-term pressure trend was increasing, decreasing, or constant. The result was that no useful estimates of gas-generation rates could be deduced from the pressure data. Several initial attempts were made to quantify the pressure fluctuations by relating these to the measured temperature variation, but none was successful. The work reported here carefully analyzed the pressure measurements to determine if these were valid or erroneous data. It was found that a thorough consideration of the physical phenomena that were occurring can, in conjunction with suitable gas laws, account quite accurately for the pressure changes that were observed. Failure of the earlier attempts to validate the data was traced to the omission of several phenomena, the most important being the variation in

  16. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    International Nuclear Information System (INIS)

    RECHARD, ROBERT P.

    2000-01-01

    The opening of the Waste Isolation Pilot Plant on March 26, 1999, was the culmination of a regulatory assessment process that had taken 25 years. National policy issues, negotiated agreements, and court settlements during the first 15 years of the project had a strong influence on the amount and type of scientific data collected up to this point. Assessment activities before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to satisfy negotiated agreements with the State of New Mexico, or (3) to develop general understanding of selected natural phenomena associated with nuclear waste disposal. In the last 10 years, federal compliance policy and actual regulations were sketched out, and continued to evolve until 1996. During this period, stochastic simulations were introduced as a tool for the assessment of the WIPP's performance, and four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed

  17. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    International Nuclear Information System (INIS)

    Rechard, R.P.

    1998-04-01

    Since its identification as a potential deep geologic repository in about 1973, the regulatory assessment process for the Waste Isolation Pilot Plant (WIPP) in New Mexico has developed over the past 25 years. National policy issues, negotiated agreements, and court settlements over the first half of the project had a strong influence on the amount and type of scientific data collected. Assessments and studies before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to develop general understanding of selected natural phenomena associated with nuclear waste disposal, or (3) to satisfy negotiated agreements with the State of New Mexico. In the last third of the project, federal compliance policy and actual regulations were sketched out, but continued to evolve until 1996. During this eight-year period, four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed

  18. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Rechard, R.P.

    1998-04-01

    Since its identification as a potential deep geologic repository in about 1973, the regulatory assessment process for the Waste Isolation Pilot Plant (WIPP) in New Mexico has developed over the past 25 years. National policy issues, negotiated agreements, and court settlements over the first half of the project had a strong influence on the amount and type of scientific data collected. Assessments and studies before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to develop general understanding of selected natural phenomena associated with nuclear waste disposal, or (3) to satisfy negotiated agreements with the State of New Mexico. In the last third of the project, federal compliance policy and actual regulations were sketched out, but continued to evolve until 1996. During this eight-year period, four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

  19. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    Energy Technology Data Exchange (ETDEWEB)

    RECHARD,ROBERT P.

    2000-03-01

    The opening of the Waste Isolation Pilot Plant on March 26, 1999, was the culmination of a regulatory assessment process that had taken 25 years. National policy issues, negotiated agreements, and court settlements during the first 15 years of the project had a strong influence on the amount and type of scientific data collected up to this point. Assessment activities before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to satisfy negotiated agreements with the State of New Mexico, or (3) to develop general understanding of selected natural phenomena associated with nuclear waste disposal. In the last 10 years, federal compliance policy and actual regulations were sketched out, and continued to evolve until 1996. During this period, stochastic simulations were introduced as a tool for the assessment of the WIPP's performance, and four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

  20. Hydrologic analyses of two brine encounters in the vicinity of the Waste Isolation Pilot Plant (WIPP) Site

    International Nuclear Information System (INIS)

    Spiegler, P.

    1982-12-01

    The data from ERDA-6 indicates a naturally fractured reservoir of the two-porosity type. The best estimate of the volume is about 60 thousand to 120 thousand barrels. The data from WIPP-12 also indicates a naturally fractured reservoir of the two-porosity type. The best estimate of the volume is about 5 million to 10 million barrels. The excess pressure above hydrostatic pressure suggests that the reservoirs were formed many millions of years ago. The location of the fractures suggest that their formation may be connected to the tilting of the Delaware Basin as a unit. The effect of the flow testing data on a drilling scenario through the repository many years following its closure is evaluated

  1. Digital subtraction angiography (DSA)

    International Nuclear Information System (INIS)

    Lackner, K.; Janson, R.; Franken, T.; Harder, T.; Thurn, P.

    1983-01-01

    Digital subtraction angiography is an advanced subtraction technique and a new field in which i.v. injection of contrast media is required. Conventional techniques involving i.v. injection of contrast media have the following drawbacks: 1. High amounts of contrast media; 2. simultaneous injection into the brachial veins of both arms; 3. poor imaging of blood vessels in regions with strongly varying X-ray absorption characteristics of the background; 4. no possibility of contrast amplification. In conventional subtraction techniques, image processing takes place as a second step after the examination, so that results are not immediately available for interpretation. Digital subtraction angiography largely avoids these drawbacks. (orig./MG) [de

  2. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 6, Chapter D, Appendices D4--D13: Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    This report (Vol. 6) for the WIPP facility contains appendices on the following information: Site characterization; general geology; ecological monitoring; and chemical compatibility of waste forms and container materials.

  3. Acute Antibody-Mediated Rejection in Presence of MICA-DSA and Successful Renal Re-Transplant with Negative-MICA Virtual Crossmatch.

    Directory of Open Access Journals (Sweden)

    Yingzi Ming

    Full Text Available The presence of donor-specific alloantibodies (DSAs against the MICA antigen results in high risk for antibody-mediated rejection (AMR of a transplanted kidney, especially in patients receiving a re-transplant. We describe the incidence of acute C4d+ AMR in a patient who had received a first kidney transplant with a zero HLA antigen mismatch. Retrospective analysis of post-transplant T and B cell crossmatches were negative, but a high level of MICA alloantibody was detected in sera collected both before and after transplant. The DSA against the first allograft mismatched MICA*018 was in the recipient. Flow cytometry and cytotoxicity tests with five samples of freshly isolated human umbilical vein endothelial cells demonstrated the alloantibody nature of patient's MICA-DSA. Prior to the second transplant, a MICA virtual crossmatch and T and B cell crossmatches were used to identify a suitable donor. The patient received a second kidney transplant, and allograft was functioning well at one-year follow-up. Our study indicates that MICA virtual crossmatch is important in selection of a kidney donor if the recipient has been sensitized with MICA antigens.

  4. Report of Class II Survey and Testing of Cultural Resources at the WIPP (Waste Isolation Pilot Plant) Site at Carlsbad, New Mexico,

    Science.gov (United States)

    1987-05-01

    Method Chronometric Sample isolated single Archaeomagnetic , obsidian component sites hydration, thermolumi- nescence, corrected radio- carbon dates ...115 Table 6.2 LA 54388 C-14 Dates , WIPP Assessment Study, ACOE, 1986 117 ,’-4 as... . -. - -, -%.F- , . -. . . % a . N .. ... < < .. <. .’a...from the study area to relatively well- dated archaeological sites which have provided chronological control for local research should be emphasized. The

  5. Tracing early breccia pipe studies, Waste Isolation Pilot Plant, southeastern New Mexico: A study of the documentation available and decision-making during the early years of WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Power, D.W. [HC 12, Anthony, TX (United States)

    1996-01-01

    Breccia pipes in southeastern New Mexico are local dissolution-collapse features that formed over the Capitan reef more than 500,000 years ago. During early site studies for the Waste Isolation Pilot Plant (WIPP), the threat to isolation by these features was undetermined. Geophysical techniques, drilling, and field mapping were used beginning in 1976 to study breccia pipes. None were found at the WIPP site, and they are considered unlikely to be a significant threat even if undetected. WIPP documents related to breccia pipe studies were assembled, inspected, and analyzed, partly to present a history of these studies. The main objective is to assess how well the record reflects the purposes, results, and conclusions of the studies from concept to decision-making. The main record source was the Sandia WIPP Central File (SWCF). Early records (about 1975 to 1977) are very limited, however, about details of objectives and plans predating any investigation. Drilling programs from about 1977 were covered by a broadly standardized statement of work, field operations plan, drilling history, and basic data report. Generally standardized procedures for peer, management, and quality assurance review were developed during this time. Agencies such as the USGS conducted projects according to internal standards. Records of detailed actions for individual programs may not be available, though a variety of such records were found in the SWCF. A complete written record cannot be reconstructed. With persistence, a professional geologist can follow individual programs, relate data to objectives (even if implied), and determine how conclusions were used in decision-making. 83 refs.

  6. Tracing early breccia pipe studies, Waste Isolation Pilot Plant, southeastern New Mexico: A study of the documentation available and decision-making during the early years of WIPP

    International Nuclear Information System (INIS)

    Power, D.W.

    1996-01-01

    Breccia pipes in southeastern New Mexico are local dissolution-collapse features that formed over the Capitan reef more than 500,000 years ago. During early site studies for the Waste Isolation Pilot Plant (WIPP), the threat to isolation by these features was undetermined. Geophysical techniques, drilling, and field mapping were used beginning in 1976 to study breccia pipes. None were found at the WIPP site, and they are considered unlikely to be a significant threat even if undetected. WIPP documents related to breccia pipe studies were assembled, inspected, and analyzed, partly to present a history of these studies. The main objective is to assess how well the record reflects the purposes, results, and conclusions of the studies from concept to decision-making. The main record source was the Sandia WIPP Central File (SWCF). Early records (about 1975 to 1977) are very limited, however, about details of objectives and plans predating any investigation. Drilling programs from about 1977 were covered by a broadly standardized statement of work, field operations plan, drilling history, and basic data report. Generally standardized procedures for peer, management, and quality assurance review were developed during this time. Agencies such as the USGS conducted projects according to internal standards. Records of detailed actions for individual programs may not be available, though a variety of such records were found in the SWCF. A complete written record cannot be reconstructed. With persistence, a professional geologist can follow individual programs, relate data to objectives (even if implied), and determine how conclusions were used in decision-making. 83 refs

  7. Hydraulic Characterization Activities in Support of the Shaft-Seals Fluid-Flow Modeling Integration into the WIPP EPA Compliance Certification Application

    International Nuclear Information System (INIS)

    Knowles, M.K.; Hurtado, L.D.; Dale, Tim

    1997-12-01

    The Waste Isolation Pilot Plant (WIPP) is a planned geologic repository for permanent disposal of transuranic waste generated by the U.S. Department of Energy. Disposal regions consist of panels and drifts mined from the bedded salt of the Salado Formation at a depth of approximately 650 m below the surface. This lithology is part of the 225 million year old Delaware Basin, and is geographically located in southeastern New Mexico. Four shafts service the facility needs for air intake, exhaust, waste handling, and salt handling. As the science advisor for the project, Sandia National Laboratories developed the WIPP shaft sealing system design. This design is a fundamental component of the application process for facility licensing, and has been found acceptable by stakeholders and regulatory agencies. The seal system design is founded on results obtained from laboratory and field experiments, numerical modeling, and engineering judgment. This paper describes a field test program to characterize the fluid flow properties in the WIPP shafts at representative seal locations. This work was conducted by Duke Engineering and Services under contract to Sandia National Laboratories in support of the seal system design

  8. Imaging in ChIPS

    Science.gov (United States)

    Miller, J.; Burke, D.; Evans, I.; Evans, J. D.; McLaughlin, W.

    2011-07-01

    The Chandra Interactive Plotting System (ChIPS) included in CIAO now allows users to incorporate and manipulate images in their plots. ChIPS uses the Visualization Toolkit (VTK) as a back end to provide basic imaging support, which includes displaying images in pseudo color or RGBA true color, adjusting the translucency of images, and several ways to threshold images. Users also have the ability to enhance them with annotations and place curves and contours directly onto the image. ChIPS imaging support provides a mechanism to adjust the image display resolution as necessary to provide high quality publication ready output. Beyond basic imaging, ChIPS includes the ability to recognize and incorporate WCS metadata into plots. ChIPS accurately calculates the intersections of world coordinate grids and plot axes, ensuring that these elements distort correctly with a tangent plane projection. Multiple image overlays are handled by reprojecting the overlaid images onto the reference image's coordinate system. New zooming and panning functions, and existing limits commands, use the WCS information from the image overlays to update the axes to reflect the new field of view being displayed. Although ChIPS already provides a number of user interactive commands, additional interactive capabilities are being considered for future releases. Enhanced interactive interfaces alongside the ability to script ChIPS in Python provide a more capable and user-friendly system.

  9. Lessons Learned from WIPP Site Characteriztion, Performance Assessment, and Regulatory Review Related to Radionuclide Migration through Water-Conducting Features

    Energy Technology Data Exchange (ETDEWEB)

    Beauheim, R.L.: Larson. K.W.

    1998-11-11

    Many lessons have been learned over the past 24 years as the Waste Isolation Pilot Plant (WIPP) project has progressed from initial site characterization to final licensing that may be of relevance to other nuclear-waste-disposal projects. These lessons pertain to the manner in which field and laboratory investigations are planned, how experiments are interpreted, how conceptual and numerical models are developed and simplified~ and how defensibility and credibility are achieved and maintained. These lessons include 1) Site characterization and performance assessment (PA) should evolve together through an iterative process, with neither activity completely dominating the other. 2) Defensibility and credibility require a much greater depth of understanding than can be represented in PA models. 3) Experimentalists should be directly involved in model and parameter abstraction and simplification for PA. 4) External expert review should be incorporated at all stages of a project~ not just after an experiment or modeling activity is completed. 5) Key individuals should be retained for the life of a project or a process must be established to transfer their working knowledge to new individuals. 6) An effective QA program needs to be stable and consistent for the duration of a project and rests on best scientific practices. All of these lessons relate to the key point that consideration must be given from the earliest planning stages to maximizing the defensibility and credibility of all work.

  10. Evolution of hydrologic systems and brine geochemistry in a deforming salt medium: Data from WIPP brine seeps

    International Nuclear Information System (INIS)

    Deal, D.E.; Roggenthen, W.M.

    1991-01-01

    The Brine Sampling and Evaluation Program (BSEP) is a formalized continuation of studies that began in 1982 as part of the Site Validation Program. The program was established in 1985. The mission was to document and investigate the origins, hydraulic characteristics, extent, and composition of brine occurrences in the Permian Salado Formation and the seepage of that brine into the WIPP excavations. This document focuses on the cumulative data obtained from the BSEP. The overall activities of the BSEP described and quantified the brine. It includes documentation and study of brine inflow into boreholes in the facility. The BSEP investigated the occurrence and development of brine weeps, crusts, and brine geochemistry. The presence of salt-tolerant bacteria in the workings was recorded and their possible interactions with experiments and operations, was assessed. The formation properties associated with the occurrence of brine was characterized. The determination of formation properties included the water content of various geologic units, direct examination of these units in boreholes using a video camera system, and measurement of electrical properties relatable to the brine contents. Modeling examined the interaction of salt deformation near the workings and the flow of brine through the deforming rocks. 34 refs

  11. Radionuclide release, transport, and consequence modeling for WIPP: a report of a workshop held on September 16-17, 1981

    International Nuclear Information System (INIS)

    1982-02-01

    The purpose of this workshop was to discuss potential mechanisms for release of radionuclides from the WIPP repository years after waste emplacement and termination of institutional controls, and the resultant radiological consequences. Opportunity was also provided for the exchange of information on meaningful release and transport models, and the availability, reliability and significance of data for the parameters applicable to those models. Other than those scenarios provided in draft by the Environmental Evaluation Group (EEG) (Appendix II), there were no new breach scenarios postulated. Also there were no major objections posed to the EEG proposals or the approaches taken in these drafts. Although there were no formal conclusions highlighted by the Conference, the EEG has concluded that the statements below provide a summary of EEG's views concerning the topics covered. These views are based upon the discussions at the Conference, the subsequent comments of the conferees, the information provided in the preceding EEG sponsored geological meeting and field trip, and the information contained in the EEG draft reports

  12. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter E, Appendix E1, Chapter L, Appendix L1: Volume 12, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility.

  13. TU-H-CAMPUS-IeP3-02: Neurovascular 4D Parametric Imaging Using Co-Registration of Biplane DSA Sequences with 3D Vascular Geometry Obtained From Cone Beam CT

    Energy Technology Data Exchange (ETDEWEB)

    Balasubramoniam, A; Bednarek, D; Rudin, S; Ionita, C [Toshiba Stroke and Vascular Research Centre, SUNY at Buffalo (United States)

    2016-06-15

    Purpose: To create 4D parametric images using biplane Digital Subtraction Angiography (DSA) sequences co-registered with the 3D vascular geometry obtained from Cone Beam-CT (CBCT). Methods: We investigated a method to derive multiple 4D Parametric Imaging (PI) maps using only one CBCT acquisition. During this procedure a 3D-DSA geometry is stored and used subsequently for all 4D images. Each time a biplane DSA is acquired, we calculate 2D parametric maps of Bolus Arrival Time (BAT), Mean Transit Time (MTT) and Time to Peak (TTP). Arterial segments which are nearly parallel with one of the biplane imaging planes in the 2D parametric maps are co-registered with the 3D geometry. The values in the remaining vascular network are found using spline interpolation since the points chosen for co-registration on the vasculature are discrete and remaining regions need to be interpolated. To evaluate the method we used a patient CT volume data set for 3D printing a neurovascular phantom containing a complete Circle of Willis. We connected the phantom to a flow loop with a peristaltic pump, simulating physiological flow conditions. Contrast media was injected with an automatic injector at 10 ml/sec. Images were acquired with a Toshiba Infinix C-arm and 4D parametric image maps of the vasculature were calculated. Results: 4D BAT, MTT, and TTP parametric image maps of the Circle of Willis were derived. We generated color-coded 3D geometries which avoided artifacts due to vessel overlap or foreshortening in the projection direction. Conclusion: The software was tested successfully and multiple 4D parametric images were obtained from biplane DSA sequences without the need to acquire additional 3D-DSA runs. This can benefit the patient by reducing the contrast media and the radiation dose normally associated with these procedures. Partial support from NIH Grant R01-EB002873 and Toshiba Medical Systems Corp.

  14. TU-H-CAMPUS-IeP3-02: Neurovascular 4D Parametric Imaging Using Co-Registration of Biplane DSA Sequences with 3D Vascular Geometry Obtained From Cone Beam CT

    International Nuclear Information System (INIS)

    Balasubramoniam, A; Bednarek, D; Rudin, S; Ionita, C

    2016-01-01

    Purpose: To create 4D parametric images using biplane Digital Subtraction Angiography (DSA) sequences co-registered with the 3D vascular geometry obtained from Cone Beam-CT (CBCT). Methods: We investigated a method to derive multiple 4D Parametric Imaging (PI) maps using only one CBCT acquisition. During this procedure a 3D-DSA geometry is stored and used subsequently for all 4D images. Each time a biplane DSA is acquired, we calculate 2D parametric maps of Bolus Arrival Time (BAT), Mean Transit Time (MTT) and Time to Peak (TTP). Arterial segments which are nearly parallel with one of the biplane imaging planes in the 2D parametric maps are co-registered with the 3D geometry. The values in the remaining vascular network are found using spline interpolation since the points chosen for co-registration on the vasculature are discrete and remaining regions need to be interpolated. To evaluate the method we used a patient CT volume data set for 3D printing a neurovascular phantom containing a complete Circle of Willis. We connected the phantom to a flow loop with a peristaltic pump, simulating physiological flow conditions. Contrast media was injected with an automatic injector at 10 ml/sec. Images were acquired with a Toshiba Infinix C-arm and 4D parametric image maps of the vasculature were calculated. Results: 4D BAT, MTT, and TTP parametric image maps of the Circle of Willis were derived. We generated color-coded 3D geometries which avoided artifacts due to vessel overlap or foreshortening in the projection direction. Conclusion: The software was tested successfully and multiple 4D parametric images were obtained from biplane DSA sequences without the need to acquire additional 3D-DSA runs. This can benefit the patient by reducing the contrast media and the radiation dose normally associated with these procedures. Partial support from NIH Grant R01-EB002873 and Toshiba Medical Systems Corp.

  15. Two-well recirculation tracer tests at the H-2 hydropad, Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    International Nuclear Information System (INIS)

    1986-10-01

    Two recirculation tracer tests were performed on the Culebra Dolomite Member of the Rustler Formation at the H-2 hydropad at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The first test, which used pentafluorobenzoate (PFB), sodium benzoate, and a suite of halocarbons for tracers, was terminated before breakthrough at the pumping well because of equipment failure. The second test, which used sodium thiocyanate (SCN) and difluorochlorobromomethane (BCF) as tracers, proceeded normally and lasted 270 days. During the second test, the tracer injected during the first test was recovered. Tracer test analyses for the two tests were performed only for the PFB tracer injected during the first test and recovered during the second, and for SCN. Analysis of the PFB recovery was crudely modeled as a one-dimensional pulse-injection test. The SCN tracer used in the second test was analyzed with the homogeneous, isotropic Grove and Beetem one-dimensional porous-medium recirculating flow test model. In general, model predictions are in poor agreement with the field measurements. Discrepancies could be produced by the combined effects of local nonhomogeneities, matrix diffusion, and possible sorption or degradation of the tracer during the test. The best overall match between the SCN breakthrough curve predicted by the semianalytical model and that observed in measurements was achieved using a porosity that ranged from 17% to 19% and a dispersivity of 16 to 18 ft. A match based only on the early part of the breakthrough curve, however, yielded a porosity of 11.5% and a dispersivity of 8 ft. The latter porosity might more closely represent the effective porosity of the Culebra, if the SCN degraded during the test

  16. Dissolution of evaporites and its possible impact on the integrity of the Waste Isolation Pilot Plant (WIPP) New Mexico, USA

    International Nuclear Information System (INIS)

    Zand, S.M.

    1982-01-01

    The radiological consequences of a breach of the WIPP TRU waste repository, as a result of dissolution processes were shown to be in two broad classes. Most of the possible scenarieos that could happen as a result of the deep dissolution processes were shown to be addressed by the scenarios already presented elsewhere or are being investigated at the present. The remaining possible scenarios, except one, showed that the possible release of radionuclides through the geosphere to the biosphere would take periods of time orders-of-magnitude longer than the half-life of Plutonium-239. The one not specifically addressed, a postulated hydralogic pathway with the characteristics of the Salado/Castile interface aquifer, appears unlikely. However, it should be quantified when more data become available. To obtain a better understanding of the radiological health effects of the deep dissolution-caused breach of the repository, emphasis must be placed on better evaluation and refinement of the existing mathematical models and associated parameters. In the majority of the existing scenarios the most significant pathway of the radionuclide through the geosphere to the biosphere is the dolomitic Magenta and Culebra aquifers. Because these formations are fractured, mathematical modeling of radionuclide transport is subject to a large degree of uncertainty. Other uncertainties that relate to this pathway which need further study are: (a) the possibility of having more permeable abandoned mined potash tunnels as a part of the radionuclide flow path and (b) the outcrops of the Magenta and Culebra formations in Nash Draw, 11 km (7 mi) before the outlet to the Pecos River at Malaga Bend. The problems associated with the quantifications of these uncertainties as well as the effects of long-term climatic and hydrologic changes and hydrogeological data requirements of the models should be further addressed

  17. The densities of halite-saturated WIPP-A and NBT-6 brines and their NaCl contents in weight percent, molal, and molar units from 20 to 100 degrees C

    Science.gov (United States)

    Chou, I-Ming; Buizinga, B.; Clynne, M.A.; Potter, R.W.

    1982-01-01

    A series of density measurements has been performed at 30?, 50?, 70?, and 90?C for halite-undersaturated WIPP-A and NBT-6 brines with various NaCl contents approaching saturation. The densities of halite-saturated WIPP-A and NBT-6 brines were obtained by extrapolating these measured densities to halite saturation points. The maximum difference between the densities obtained in this Fashion and those calculated from the model of Potter and Haas is 0.015 g/cm3. The NaCl contents in halite-saturated WIPP-A and NBT-6 brines are reported in wt %, molal, and molar units from 20? to 100?C.

  18. A comparison of geostatistically-based inverse techniques for use in performance assessment analysis at the WIPP site results from test case No. 1

    International Nuclear Information System (INIS)

    Zimmerman, D.A.; Gallegos, D.P.

    1993-01-01

    The groundwater flow pathway in the Culebra Dolomite aquifer at the Waste Isolation Pilot Plant (WIPP) has been identified as a potentially important pathway for radionuclide migration to the accessible environment. Consequently, uncertainties in the models used to described flow and transport in the Culebra need to be addressed. A 'Geostatistics Test Problem' is being developed as a highly complex synthetic data set; the intent is for the ensemble of these data sets span the range of possible conceptual models of groundwater flow at the WIPP site. The Test Problem analysis approach is to use a comparison of the probabilistic groundwater travel time (GWTT) estimates produced by each technique as the basis for the evaluation. Participants are given observations of head and transmissivity and are asked to develop stochastic models of groundwater flow for the synthetic system. Cumulative distribution functions (CDFs) of groundwater flow (computed via particle tracking) are constructed using the head and transmissivity data generated through the application of each technique; one semi-analytical method generates the CDFs of groundwater flow directly. This paper describes the results from Test Case No 1. Of the five techniques compared, those based on the linearized form of the groundwater flow equation exhibited less bias and less spread in their GWTT distribution functions; the semi-analytical method had the least bias. While the results are not sufficient to make generalizations about which techniques may be better suited for the WIPP PA (only one test case has been exercised), analysis of the data from this test case provides some indication about the relative importance of other aspects of the flow modeling (besides inverse method or geostatistical approach) in PA. These ancillary analyses examine the effect of gridding and the effect of boundary conditions on the groundwater travel time estimates

  19. Wellbore Flow Treatment Used to Predict Radioactive Brine Releases to the Surface from Future Drilling Penetrations into th Waste Isolation Pilot Plant (WIPP), New Mexico, USA

    Energy Technology Data Exchange (ETDEWEB)

    Hadgu, T.; O' Brien, D.G.; Stoelzel, D.M.; Vaughn, P.

    1998-10-15

    The Waste Isolation Pilot Plant (WIPP) is the U.S. Department of Energy's (DOE) mined geologic repository in southeastern New Mexico, USA. This site is designed for the permanent burial of transuranic radioactive waste generated by defense related activities. The waste produces gases when exposed to brine. This gas generation may result in increased pressures over time. Thereforq a future driller that unknowingly penetrates through the site may experience a blowout This paper describes the methodology used to predict the resultant volumes of contaminated brine released to the surface.

  20. CH2 - Lighting and Physiology

    Directory of Open Access Journals (Sweden)

    Sergio Altomonte

    2012-11-01

    Full Text Available This paper explains the designed performances of the new CH2 building in Melbourne, Australia. CH2 is an environmentally significant project that involves biomimicry of natural systems to produce indoor conditions that are conducive to user comfort, health and productivity. This paper focuses on lighting and physiology and examines the solutions chosen for artificial and natural lighting and the likely effects these will have on building occupants. The purpose of the paper is to critically comment on the adopted strategy and, cognisance of contemporary thinking in lighting design, to judge the effectiveness of this aspect of the project with a view to later verification and post-occupancy review. The paper concludes that CH2 is an exemplar of lighting innovation that provides valuable lessons to designers of office buildings, particularly in the Melbourne CSD.

  1. ChIP and ChIP-Related Techniques: Expanding the Fields of Application and Improving ChIP Performance.

    Science.gov (United States)

    Visa, Neus; Jordán-Pla, Antonio

    2018-01-01

    Protein-DNA interactions in vivo can be detected and quantified by chromatin immunoprecipitation (ChIP). ChIP has been instrumental for the advancement of epigenetics and has set the groundwork for the development of a number of ChIP-related techniques that have provided valuable information about the organization and function of genomes. Here, we provide an introduction to ChIP and discuss the applications of ChIP in different research areas. We also review some of the strategies that have been devised to improve ChIP performance.

  2. Laboratory creep and mechanical tests on salt data report (1975-1996): Waste Isolation Pilot Plant (WIPP) thermal/structural interactions program

    Energy Technology Data Exchange (ETDEWEB)

    Mellegard, K.D. [RE/SPEC Inc., Rapid City, SD (United States); Munson, D.E. [Sandia National Labs., Albuquerque, NM (United States)

    1997-02-01

    The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, New Mexico, is being used by the U.S. Department of Energy to demonstrate the technology for safe handling and disposal of transuranic wastes produced by defense activities in the United States. In support of that demonstration, mechanical tests on salt were conducted in the laboratory to characterize material behavior at the stresses and temperatures expected for a nuclear waste repository. Many of those laboratory test programs have been carried out in the RE/SPEC Inc. rock mechanics laboratory in Rapid City, South Dakota; the first program being authorized in 1975 followed by additional testing programs that continue to the present. All of the WIPP laboratory data generated on salt at RE/SPEC Inc. over the last 20 years is presented in this data report. A variety of test procedures were used in performance of the work including quasi-static triaxial compression tests, constant stress (creep) tests, damage recovery tests, and multiaxial creep tests. The detailed data is presented in individual plots for each specimen tested. Typically, the controlled test conditions applied to each specimen are presented in a plot followed by additional plots of the measured specimen response. Extensive tables are included to summarize the tests that were performed. Both the tables and the plots contain cross-references to the technical reports where the data were originally reported. Also included are general descriptions of laboratory facilities, equipment, and procedures used to perform the work.

  3. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Chapter D, Appendix D1 (conclusion), Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Neville G.W.; Heuze, Francois E.; Miller, Hamish D.S.; Thoms, Robert L.

    1993-03-01

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change.

  4. La Lavagna Interattiva Multimediale a supporto degli studenti disabili e con DSA all’Università di Modena e Reggio Emilia

    Directory of Open Access Journals (Sweden)

    Giacomo Guaraldi

    2013-03-01

    Full Text Available Negli ultimi anni l’introduzione delle moderne tecnologie ha consentito agli studenti con disabilità di raggiungere un maggior grado di autonomia e ha favorito un mutamento nella didattica che è diventata sempre più una «didattica inclusiva», incentrata sui bisogni educativi speciali di tali soggetti e soprattutto sulle potenzialità nascoste in essi. I software per l’apprendimento, le sintesi vocali, le lavagne interattive multimediali (LIM, i netbook, i tablets, gli Ipad creano una «rete integrata» che permette, grazie a linguaggi diversi e multimodali, di accrescere l’autostima dei soggetti con disabilità e favorire la loro autonomia. La lavagna è uno strumento che stimola l’apprendimento, in quanto utilizza un linguaggio più vicino alla modalità comunicativa delle nuove generazioni, riducendo così la distanza docente e discente. Questo è tanto più importante nel caso di studenti con disabilità o con disturbo specifico dell’apprendimento: il disabile sensoriale può utilizzare la modalità comunicativa residua, il disabile motorio può «sfogliare» un testo, farselo leggere, prendere appunti, il ragazzo con DSA può usufruire della sintesi vocale per la lettura e/o per il supporto alla scrittura.

  5. Characterization of arterial stenosis using 3D imaging: comparison between three imaging techniques (MRA, spiral CTA and 3D DSA) and four display methods (MIP, SR, MPVR, VA) in a phantom study

    International Nuclear Information System (INIS)

    Bendib, K.; Poirier, C.; Croisille, P.; Roux, J.P.; Devel, D.; Amiel, M.

    1999-01-01

    Introduction: accurate assessment of arterial stenosis is a major public health issue for the diagnosis and treatment of cardiovascular diseases. The number of imaging techniques and types of software for display of imaging data is increasing. Few studies that compare these different techniques are available in the literature. Materials and methods: using phantoms to reproduce the main types of arterial stenosis, the authors compared three 3D acquisition techniques (MRA, CTA, and 3D DSA) and four types of display methods (MIP, SR, MPVR, and VA). The degree, the shape, and the location of different types of stenoses were analyzed by three experienced observers during two successive readings. Intra- and inter-observer reproducibility were assessed. The results of the various acquisition techniques and display methods also were compared to the digital reference data (CFAO) of the physical phantoms. Results: the degree of intra- and inter-observer reproducibility for the assessment of shape and location of the stenoses was good. Visual assessment of the degree of stenosis showed significant differences between two observers as well as in two readings by one observer. The 3D DSA was the most accurate technique for assessing the degree of stenosis. CTA provided better results than MRA. MPVR provided an accurate assessment of the degree of the stenosis. 3D DSA and CTA assessed stenosis form and localization adequately, with no significant difference; both methods appeared to be more accurate than MRA. SR provided the best information on the eccentric nature of the stenosis. The shape was very well assessed by VA and MPVR. Conclusions: even though 3D DSA is the most accurate acquisition technique for visualization, the combined use of SR and MPVR appears to be the best compromise to describe the morphology and degree of stenosis. Further improvements in automatic 3D image processing could offer a better understanding and increased possibilities for assessing arterial

  6. Phenol removal from wastewaters by electrochemical oxidation using boron doped diamond (BDD) and Ti/Ti{sub 0.7}Ru{sub 0.3}O{sub 2} DSA Registered-Sign electrodes

    Energy Technology Data Exchange (ETDEWEB)

    Britto-Costa, P.H.; Ruotolo, L.A.M., E-mail: pluis@ufscar.br [Universidade Federal de Sao Carlos (UFSCAR), SP (Brazil). Dept. de Engenharia Quimica

    2012-10-15

    Industrial wastewater containing non-biodegradable organic pollutants consists of highly toxic effluents whose treatment is necessary due to environmental and economical restrictions. In order to treat these effluents, an electrochemical process using a dimensionally stable anode (DSA Registered-Sign ) and boron-doped diamond (BDD) electrode was studied. The performance of these electrodes for COD removal from aqueous phenol solution was evaluated in the absence and presence of different chloride concentrations. The results showed that DSA Registered-Sign could be successfully used to remove COD when high chloride concentration (3035 mg L{sup -1}Cl{sup -}) and mild current density are employed (50 mA cm{sup -2}). On the other hand, the presence of chloride did not have the same significant effect on the COD depletion rate using BDD; however, under mild conditions (50 mA cm{sup -2}, 0.190 m s{sup -1}), the addition of 607 mg L{sup -1} Cl{sup -} improved the COD removal by approximately 52% after 8 hours of electrolysis. The effect of current density (i) and flow velocity (v) were also studied, and it was verified that they have an important role on the process performance, especially when DSA Registered-Sign is used. (author)

  7. Studies of transuranic waste storage under conditions expected in the Waste Isolation Pilot Plant (WIPP). Interim summary report, October 1, 1977-June 15, 1979

    International Nuclear Information System (INIS)

    Kosiewicz, S.T.; Barraclough, B.L.; Zerwekh, A.

    1980-01-01

    The major focus of the program has been on the gas generation potential of organic wastes produced by radiolytic and thermal degradation under simulated WIPP storage conditions. The effects of TRU contamination level, temperature, waste type, pressure, and exposure time on radiolysis are presented. In addition, results from preliminary experiments on processed sludge dewatering are discussed. A summary is presented here of the results of a detailed study of all retrievably stored TRU wastes present at LASL before January 1, 1978. The data indicate a gross volume for the LASL inventory of 1610 m 3 with a total weight of nearly 1.24 x 10 6 kg (1240 metric tonnes). The dominant radionuclide contents of the waste are plutonium (primarily 238 Pu) and americium

  8. Hepatic Arterial Configuration in Relation to the Segmental Anatomy of the Liver; Observations on MDCT and DSA Relevant to Radioembolization Treatment

    Energy Technology Data Exchange (ETDEWEB)

    Hoven, Andor F. van den, E-mail: a.f.vandenhoven@umcutrecht.nl; Leeuwen, Maarten S. van, E-mail: m.s.vanleeuwen@umcutrecht.nl; Lam, Marnix G. E. H., E-mail: m.lam@umcutrecht.nl; Bosch, Maurice A. A. J. van den, E-mail: mbosch@umcutrecht.nl [University Medical Center Utrecht, Department of Radiology and Nuclear Medicine (Netherlands)

    2015-02-15

    PurposeCurrent anatomical classifications do not include all variants relevant for radioembolization (RE). The purpose of this study was to assess the individual hepatic arterial configuration and segmental vascularization pattern and to develop an individualized RE treatment strategy based on an extended classification.MethodsThe hepatic vascular anatomy was assessed on MDCT and DSA in patients who received a workup for RE between February 2009 and November 2012. Reconstructed MDCT studies were assessed to determine the hepatic arterial configuration (origin of every hepatic arterial branch, branching pattern and anatomical course) and the hepatic segmental vascularization territory of all branches. Aberrant hepatic arteries were defined as hepatic arterial branches that did not originate from the celiac axis/CHA/PHA. Early branching patterns were defined as hepatic arterial branches originating from the celiac axis/CHA.ResultsThe hepatic arterial configuration and segmental vascularization pattern could be assessed in 110 of 133 patients. In 59 patients (54 %), no aberrant hepatic arteries or early branching was observed. Fourteen patients without aberrant hepatic arteries (13 %) had an early branching pattern. In the 37 patients (34 %) with aberrant hepatic arteries, five also had an early branching pattern. Sixteen different hepatic arterial segmental vascularization patterns were identified and described, differing by the presence of aberrant hepatic arteries, their respective vascular territory, and origin of the artery vascularizing segment four.ConclusionsThe hepatic arterial configuration and segmental vascularization pattern show marked individual variability beyond well-known classifications of anatomical variants. We developed an individualized RE treatment strategy based on an extended anatomical classification.

  9. Potential microbial impact on transuranic wastes under conditions expected in the Waste Isolation Pilot Plant (WIPP). Annual report, October 1, 1978-September 30, 1979

    International Nuclear Information System (INIS)

    Barnhart, B.J.; Campbell, E.W.; Martinez, E.; Caldwell, D.E.; Hallett, R.

    1980-07-01

    Previous results were confirmed showing elevated frequencies of radiation-resistant bacteria in microorganisms isolated from shallow transuranic (TRU) burial soil that exhibits nanocurie levels of beta and gamma radioactivity. Research to determine whether plutonium could be methylated by the microbially produced methyl donor, methylcobalamine, was terminated when literature and consulting radiochemists confirmed that other alkylated transuranic elements are extremely short-lived in the presence of oxygen. Emphasis was placed on investigation of the dissolution of plutonium dioxide by complex formation between plutonium and a polyhydroxamate chelate similar to that produced by microorganisms. New chromatographic and spectrophotometric evidence supports previous results showing enhanced dissolution of alpha radioactivity when 239 Pu dioxide was mixed with the chelate Desferol. Microbial degradation studies of citrate, ethylenediamine tetraacetate (EDTA), and nitrilo triacetate (NTA) chelates of europium are in progress. Current results are summarized. All of the chelates were found to degrade. The average half-life for citrate, NTA, and EDTA was 3.2, 8.0, and 28 years, respectively. Microbial CO 2 generation is also in progress in 72 tests on several waste matrices under potential WIPP isolation conditions. The mean rate of gas generation was 5.97 μg CO 2 /g waste/day. Increasing temperature increased rates of microbial gas generation across treatments of brine, varying water content, nutrient additions, and anaerobic conditions. No microbial growth was detected in experiments to enumerate and identify the microorganisms in rocksalt cores from the proposed WIPP site. This report contains the year's research results and recommendations derived for the design of safe storage of TRU wastes under geologic repository conditions

  10. Comparison of Three Isoelectronic Multiple-Well Reaction Systems: OH + CH2O, OH + CH2CH2, and OH + CH2NH.

    Science.gov (United States)

    Akbar Ali, Mohamad; Barker, John R

    2015-07-16

    Methylenimine (CH2NH) has been predicted to be a product of the atmospheric photo-oxidation of methylamine, but its atmospheric reactions have not been measured. In this paper, we report potential energy surfaces (PESs) and rate constants for OH + CH2NH and its isoelectronic analogues OH + CH2O and OH + CH2CH2, which are more fully understood. The PESs were computed using the BHandHLYP/aug-cc-pVTZ and CCSD(T)/aug-cc-pVTZ levels of theory. Canonical variational transition state theory and Rice-Ramsperger-Kassel-Marcus and master equation modeling were used to calculate temperature- and pressure-dependent rate constants, with particular emphasis on the OH + reactant entrance channels and the effects of prereactive complexes. The computed results are in reasonable agreement with experimental data where they can be compared and also with the results of previous theoretical calculations. The results show that to some extent OH radicals both add to the carbon center double bond in CH2NH and abstract methylene hydrogen atoms, as in the OH + CH2O and OH + CH2CH2 reactions, respectively, but the dominant pathway is abstraction of the hydrogen from N-H. The computed rate constants are suitable for both atmospheric and combustion modeling.

  11. libChEBI: an API for accessing the ChEBI database.

    Science.gov (United States)

    Swainston, Neil; Hastings, Janna; Dekker, Adriano; Muthukrishnan, Venkatesh; May, John; Steinbeck, Christoph; Mendes, Pedro

    2016-01-01

    ChEBI is a database and ontology of chemical entities of biological interest. It is widely used as a source of identifiers to facilitate unambiguous reference to chemical entities within biological models, databases, ontologies and literature. ChEBI contains a wealth of chemical data, covering over 46,500 distinct chemical entities, and related data such as chemical formula, charge, molecular mass, structure, synonyms and links to external databases. Furthermore, ChEBI is an ontology, and thus provides meaningful links between chemical entities. Unlike many other resources, ChEBI is fully human-curated, providing a reliable, non-redundant collection of chemical entities and related data. While ChEBI is supported by a web service for programmatic access and a number of download files, it does not have an API library to facilitate the use of ChEBI and its data in cheminformatics software. To provide this missing functionality, libChEBI, a comprehensive API library for accessing ChEBI data, is introduced. libChEBI is available in Java, Python and MATLAB versions from http://github.com/libChEBI, and provides full programmatic access to all data held within the ChEBI database through a simple and documented API. libChEBI is reliant upon the (automated) download and regular update of flat files that are held locally. As such, libChEBI can be embedded in both on- and off-line software applications. libChEBI allows better support of ChEBI and its data in the development of new cheminformatics software. Covering three key programming languages, it allows for the entirety of the ChEBI database to be accessed easily and quickly through a simple API. All code is open access and freely available.

  12. Comparing genome-wide chromatin profiles using ChIP-chip or ChIP-seq

    NARCIS (Netherlands)

    Johannes, F.; Wardenaar, R.; Colome-Tatche, M.; Mousson, F.; de Graaf, P.; Mokry, M.; Guryev, V.; Timmers, H.T.; Cuppen, E.; Jansen, R.

    2010-01-01

    MOTIVATION: ChIP-chip and ChIP-seq technologies provide genome-wide measurements of various types of chromatin marks at an unprecedented resolution. With ChIP samples collected from different tissue types and/or individuals, we can now begin to characterize stochastic or systematic changes in

  13. Comparing genome-wide chromatin profiles using ChIP-chip or ChIP-seq

    NARCIS (Netherlands)

    Johannes, Frank; Wardenaar, Rene; Colomé Tatché, Maria; Mousson, Florence; de Graaf, Petra; Mokry, Michal; Guryev, Victor; Timmers, H. Th. Marc; Cuppen, Edwin; Jansen, Ritsert C.; Bateman, Alex

    2010-01-01

    Motivation: ChIP-chip and ChIP-seq technologies provide genomewide measurements of various types of chromatin marks at an unprecedented resolution. With ChIP samples collected from different tissue types and/ or individuals, we can now begin to characterize stochastic or systematic changes in

  14. (CH4)-C-14 Measurements in Greenland Ice: Investigating Last Glacial Termination CH4 Sources

    DEFF Research Database (Denmark)

    Petrenko, V. V.; Smith, A. M.; Brook, E. J.

    2009-01-01

    contributions to this increase. We present measurements of (CH4)-C-14 in glacial ice, targeting this transition, performed by using ice samples obtained from an ablation site in west Greenland. Measured (CH4)-C-14 values were higher than predicted under any scenario. Sample (CH4)-C-14 appears to be elevated...

  15. Detection of CH and CH+ in a high latitude molecular cloud

    NARCIS (Netherlands)

    Vries, de C.P.; Dishoeck, van E.F.

    1988-01-01

    Interstellar absorption lines of CH and CH(+) have been detected toward the star HD 210121, which is located behind a previously unknown high-latitude cloud. The CH observations and the measured extinction toward the star provide independent measures of the H2 column density along the line of sight,

  16. WIPP site and vicinity geological field trip. A report of a field trip to the proposed Waste Isolation Pilot Plant project in Southeastern New Mexico, June 16 to 18, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Chaturvedi, L

    1980-10-01

    The Environmental Evaluation Group is conducting an assessment of the radiological health risks to people from the Waste Isolation Pilot Plant. As a part of this work, EEG is making an effort to improve the understanding of those geological issues concerning the WIPP site which may affect the radiological consequences of the proposed repository. One of the important geological issues to be resolved is the timing and the nature of the dissolution processes which may have affected the WIPP site. EEG organized a two-day conference of geological scientists, on January 17-18, 1980. On the basis of the January conference and the June field trip, EEG has formed the following conclusions: (1) it has not been clearly established that the site or the surrounding area has been attacked by deep dissolution to render it unsuitable for the nuclear waste pilot repository; (2) the existence of an isolated breccia pipe at the site unaccompanied by a deep dissolution wedge, is a very remote possibility; (3) more specific information about the origin and the nature of the brine reservoirs is needed. An important question that should be resolved is whether each encounter with artesian brine represents a separate pocket or whether these occurrences are interconnected; (4) Anderson has postulated a major tectonic fault or a fracture system at the Basin margin along the San Simon Swale; (5) the area in the northern part of the WIPP site, identified from geophysical and bore hole data as the disturbed zone, should be further investigated to cleary understand the nature and significance of this structural anomaly; and (6) a major drawback encountered during the discussions of geological issues related to the WIPP site is the absence of published material that brings together all the known information related to a particular issue.

  17. Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    2005-01-01

    The purpose of this document is to summarize the waste acceptance criteria applicable to the transportation, storage, and disposal of contact-handled transuranic (CH-TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE) primary directive for ensuring that CH-TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.The authorization basis of WIPP for the disposal of CH-TRU waste includes the U.S.Department of Energy National Security and Military Applications of Nuclear EnergyAuthorization Act of 1980 (reference 1) and the WIPP Land Withdrawal Act (LWA;reference 2). Included in this document are the requirements and associated criteriaimposed by these acts and the Resource Conservation and Recovery Act (RCRA,reference 3), as amended, on the CH-TRU waste destined for disposal at WIPP.|The DOE TRU waste sites must certify CH-TRU waste payload containers to thecontact-handled waste acceptance criteria (CH-WAC) identified in this document. Asshown in figure 1.0, the flow-down of applicable requirements to the CH-WAC istraceable to several higher-tier documents, including the WIPP operational safetyrequirements derived from the WIPP CH Documented Safety Analysis (CH-DSA;reference 4), the transportation requirements for CH-TRU wastes derived from theTransuranic Package Transporter-Model II (TRUPACT-II) and HalfPACT Certificates ofCompliance (references 5 and 5a), the WIPP LWA (reference 2), the WIPP HazardousWaste Facility Permit (reference 6), and the U.S. Environmental Protection Agency(EPA) Compliance Certification Decision and approval for PCB disposal (references 7,34, 35, 36, and 37). The solid arrows shown in figure 1.0 represent the flow-down of allapplicable payload container-based requirements. The two dotted arrows shown infigure 1.0 represent the flow-down of summary level requirements only; i.e., the sitesmust reference the regulatory source

  18. Radiative forcing calculations for CH3Cl

    International Nuclear Information System (INIS)

    Grossman, A.S.; Grant, K.E.; Wuebbles, D.J.

    1994-06-01

    Methyl chloride, CH 3 Cl, is the major natural source of chlorine to the stratosphere. The production of CH 3 Cl is dominated by biological sources from the oceans and biomass burning. Production has a seasonal cycle which couples with the short lifetime of tropospheric CH 3 Cl to produce nonuniform global mixing. As an absorber of infrared radiation, CH 3 Cl is of interest for its potential affect on the tropospheric energy balance as well as for its chemical interactions. In this study, we estimate the radiative forcing and global warming potential (GWP) of CH 3 Cl. Our calculations use an infrared radiative transfer model based on the correlated k-distribution algorithm for band absorption. Global and annual average vertical profiles of temperature and trace gas concentration were assumed. The effects of clouds are modeled using three layers of global and annual average cloud optical properties. A radiative forcing value of 0.0053 W/m 2 ppbv was obtained for CH 3 Cl and is approximately linear in the background abundance. This value is about 2 percent of the forcing of CFC-11 and about 300 times the forcing of CO 2 , on a per molecule basis. The radiative forcing calculation for CH 3 Cl is used to estimate the global warming potential (GWP) of CH 3 Cl. The results give GWPs for CH 3 Cl of the order of 25 at a time of 20 years(CO 2 = 1). This result indicates that CH 3 Cl has the potential to be a major greenhouse gas if significant human related emissions were introduced into the atmosphere

  19. Inhibition of Ps Formation in Benzene and Cyclohexane by CH3CI and CH3Br

    DEFF Research Database (Denmark)

    Wikander, G.; Mogensen, O. E.; Pedersen, Niels Jørgen

    1983-01-01

    Positron-annihilation lifetime spectra have been measured for mixtures of CH3Cl and CH3Br in cyclohexane and of CH3Cl in benzene. The ortho-positronium (Ps) yield decreased monotonically from 38% and 43% in cyclohexane and benzene respectively to 11% in pure CH3Cl and 6% in pure CH3Br. The strength......− anions to form Ps. while it forms a bound state with the halides. X−. CH3Cl was a roughly three times weaker Ps inhibitor in benzene than in cyclohexane, which shows that CH3Cl− does not dechlorinate in times comparable to or shorter than 400–500 ps in benzene. An improved model for the explanation of Ps...

  20. The reaction of fluorine atoms with methanol: yield of CH3O/CH2OH and rate constant of the reactions CH3O + CH3O and CH3O + HO2.

    Science.gov (United States)

    Assaf, Emmanuel; Schoemaecker, Coralie; Vereecken, Luc; Fittschen, Christa

    2018-04-25

    Xenondifluoride, XeF2, has been photolysed in the presence of methanol, CH3OH. Two reaction pathways are possible: F + CH3OH → CH2OH + HF and F + CH3OH → CH3O + HF. Both products, CH2OH and CH3O, will be converted to HO2 in the presence of O2. The rate constants for the reaction of both radicals with O2 differ by more than 3 orders of magnitude, which allows an unequivocal distinction between the two reactions when measuring HO2 concentrations in the presence of different O2 concentrations. The following yields have then been determined from time-resolved HO2 profiles: φCH2OH = (0.497 ± 0.013) and φCH3O = (0.503 ± 0.013). Experiments under low O2 concentrations lead to reaction mixtures containing nearly equal amounts of HO2 (converted from the first reaction) and CH3O (from the second reaction). The subsequent HO2 decays are very sensitive to the rate constants of the reaction between these two radicals and the following rate constants have been obtained: k(CH3O + CH3O) = (7.0 ± 1.4) × 10-11 cm3 s-1 and k(CH3O + HO2) = (1.1 ± 0.2) × 10-10 cm3 s-1. The latter reaction has also been theoretically investigated on the CCSD(T)//M06-2X/aug-cc-pVTZ level of theory and CH3OH + O2 have been identified as the main products. Using μVTST, a virtually pressure independent rate constant of k(CH3O + HO2) = 4.7 × 10-11 cm3 s-1 has been obtained, in good agreement with the experiment.

  1. Crack closure and healing studies in WIPP [Waste Isolation Pilot Plant] salt using compressional wave velocity and attenuation measurements: Test methods and results

    International Nuclear Information System (INIS)

    Brodsky, N.S.

    1990-11-01

    Compressional wave ultrasonic data were used to qualitatively assess the extent of crack closure during hydrostatic compression of damaged specimens of WIPP salt. Cracks were introduced during constant strain-rate triaxial tests at low confining pressure (0.5 MPa) as specimens were taken to either 0.5, 1.0, or 1.5 percent axial strain. For three specimens taken to 1.0 percent axial strain, the pressure was increased to 5, 10 or 15 MPa. For the remaining specimens, pressure was raised to 15 MPa. Waveforms for compressional waves traveling both parallel and perpendicular to the direction of maximum principal stress were measured in the undamaged state, during constant strain-rate tests, and then monitored as functions of time while the specimens were held at pressure. Both wave velocities and amplitudes increased over time at pressure, indicating that cracks closed and perhaps healed. The recovery of ultrasonic wave characteristics depended upon both pressure and damage level. The higher the pressure, the greater the velocity recovery; however, amplitude recovery showed no clear correlation with pressure. For both amplitudes and velocities, recoveries were greatest in the specimens with the least damage. 13 refs., 15 figs., 1 tab

  2. Stanovení vybraných kovů v ovocných kompotech

    OpenAIRE

    Hauerlandová, Petra

    2012-01-01

    Tato diplomová práce je zaměřena na stanovení vybraných kovů v ovocných kompotech balených v plechových konzervách. Je v ní popsána výroba ovocných kompotů a kovových obalových materiálů, legislativa týkající se studované problematiky, možnosti kontaminace potraviny složkami obalu, koroze obalů, migrace kovů z obalů a techniky používané pro analýzu kovů v potravinářství. V experimentální části byly pomocí techniky ICP-MS stanoveny koncentrace kovů v 14 různých ovocných kompotech z obchodní sí...

  3. Rate Constants for the Reactions of OH with CH(sub 3)Cl, CH(sub 2) C1(sub 2), CHC1(sub 3)and CH(sub 3)Br

    Science.gov (United States)

    Hsu, H-J.; DeMore, W.

    1994-01-01

    Rate constants for the reactions of OH with CH3C1, CH2Cl2, CHCl3 and CH3Br have been measured by a relative rate technique in which the reaction rate of each compound was compared to that of HFC-152a (CH3CHF2)and for CH2Cl2, HFC-161 (CH3CH2F).

  4. Uncovering the CH-53E Doppler Myth

    National Research Council Canada - National Science Library

    Lamigo, Dwaine

    2008-01-01

    The CH-53E's Helicopter Night Vision System's (HNVS) doppler generated cuing ability is a valuable asset that can enhance the pilot's situational awareness and mitigate spatial disorientation in low-level maneuvers...

  5. Ultraviolet absorption spectra and kinetics of CH3S and CH2SH radicals

    DEFF Research Database (Denmark)

    Anastasi, C.; Broomfield, M.; Nielsen, O.J.

    1991-01-01

    The ultraviolet absorption spectra of CH3S and CH2SH radicals have been measured between 215 and 380 nm using the pulse-radiolysis/kinetic-absorption method. One absorption band between 250 and 300 nm and one around 215 nm have been tentatively assigned to the CH2SH and CH3S radicals, respectively....... This spectrum has been used to measure the self-reaction rates of these radicals. Rate constants of 4 x 10(-11) and 7 x 10(-11) cm3 molecule-1 s-1 have been measured at 298 K for CH3S and CH2SH recombination, respectively. The possible reaction pathways are discussed....

  6. ChIP-re-ChIP: Co-occupancy Analysis by Sequential Chromatin Immunoprecipitation.

    Science.gov (United States)

    Beischlag, Timothy V; Prefontaine, Gratien G; Hankinson, Oliver

    2018-01-01

    Chromatin immunoprecipitation (ChIP) exploits the specific interactions between DNA and DNA-associated proteins. It can be used to examine a wide range of experimental parameters. A number of proteins bound at the same genomic location can identify a multi-protein chromatin complex where several proteins work together to regulate gene transcription or chromatin configuration. In many instances, this can be achieved using sequential ChIP; or simply, ChIP-re-ChIP. Whether it is for the examination of specific transcriptional or epigenetic regulators, or for the identification of cistromes, the ability to perform a sequential ChIP adds a higher level of power and definition to these analyses. In this chapter, we describe a simple and reliable method for the sequential ChIP assay.

  7. libChEBI: an API for accessing the ChEBI database

    OpenAIRE

    Swainston, Neil; Hastings, Janna; Dekker, Adriano; Muthukrishnan, Venkatesh; May, John; Steinbeck, Christoph; Mendes, Pedro

    2016-01-01

    Background ChEBI is a database and ontology of chemical entities of biological interest. It is widely used as a source of identifiers to facilitate unambiguous reference to chemical entities within biological models, databases, ontologies and literature. ChEBI contains a wealth of chemical data, covering over 46,500 distinct chemical entities, and related data such as chemical formula, charge, molecular mass, structure, synonyms and links to external databases. Furthermore, ChEBI is an ontolo...

  8. Depicting CH4 fluxes and drivers dynamics

    Science.gov (United States)

    Dengel, S.; Billesbach, D. P.; Hughes, H.; Humphreys, E.; Lee, J.; Noormets, A.; Verfaillie, J. G.

    2016-12-01

    Since the advancement in CH4 eddy covariance flux measurements, monitoring of CH4 emissions is becoming more widespread. Since CH4 fluxes are not as predictable or as easily interpretable as CO2 fluxes, understanding their emission patterns often still challenging. As these are spatially (ecosystem and latitudinal) and temporal very divers and often event based, a better understanding or interpretation of results is required. An improvement in understanding does also increase the reliability of gap-filling methods as annual greenhouse gas budgets rely on high quality data. There are generalised additive models (Wood 2001) that can easily be applied to sites, models where a relationship between the response variable, in this case CH4 and explanatory variables (drivers) is established. Relevant for CH4flux dynamics are the smoothing function that is applied, where each predictor variable is separated into sections and a polynomial function fitted. On the one hand such models are rarely used as they are difficult to interpret since no parameter values are retuned. On the other hand, such models are very good for prediction and explanatory analysis in estimating the functional nature of a response. Applying such models to CH4 eddy flux data does improve our understanding of the dynamics of CH4 emissions and the respective meteorological drivers. Furthermore, such models combined with tree models (interactions between the explanatory variables), can visualise precise dynamics and easily applied to individual sites. These models are simple tools in understanding of these complex fluxes, as they can include a variety of drivers, and their relevance tested by the model. Model input variables should be as independent as possible (avoiding cross-correlation), avoiding redundant inputs, as models should follow the principle of parsimony of being simple but not too simple. Wood SN (2001). mgcv: GAMs and generalized ridge regression for R. R news.

  9. Coupled multiphase flow and closure analysis of repository response to waste-generated gas at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Freeze, G.A.; Larson, K.W.; Davies, P.B.

    1995-10-01

    A long-term assessment of the Waste Isolation Pilot Plant (WIPP) repository performance must consider the impact of gas generation resulting from the corrosion and microbial degradation of the emplaced waste. A multiphase fluid flow code, TOUGH2/EOS8, was adapted to model the processes of gas generation, disposal room creep closure, and multiphase (brine and gas) fluid flow, as well as the coupling between the three processes. System response to gas generation was simulated with a single, isolated disposal room surrounded by homogeneous halite containing two anhydrite interbeds, one above and one below the room. The interbeds were assumed to have flow connections to the room through high-permeability, excavation-induced fractures. System behavior was evaluated by tracking four performance measures: (1) peak room pressure; (2) maximum brine volume in the room; (3) total mass of gas expelled from the room; and (4) the maximum gas migration distance in an interbed. Baseline simulations used current best estimates of system parameters, selected through an evaluation of available data, to predict system response to gas generation under best-estimate conditions. Sensitivity simulations quantified the effects of parameter uncertainty by evaluating the change in the performance measures in response to parameter variations. In the sensitivity simulations, a single parameter value was varied to its minimum and maximum values, representative of the extreme expected values, with all other parameters held at best-estimate values. Sensitivity simulations identified the following parameters as important to gas expulsion and migration away from a disposal room: interbed porosity; interbed permeability; gas-generation potential; halite permeability; and interbed threshold pressure. Simulations also showed that the inclusion of interbed fracturing and a disturbed rock zone had a significant impact on system performance

  10. The role of regional groundwater flow in the hydrogeology of the Culebra member of the Rustler formation at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    International Nuclear Information System (INIS)

    Corbet, T.F.; Knupp, P.M.

    1996-12-01

    Numerical simulation has been used to enhance conceptual understanding, of the hydrogeology of the Culebra Dolomite in the context of regional groundwater flow. The hydrogeology is of interest because this unit is a possible pathway for offsite migration of radionuclides from a proposed repository for defense-generated transuranic wastes (the Waste Isolation Pilot Plant). The numerical model used is three-dimensional, extends laterally to topographic features that form the actual boundaries of a regional groundwater system, and uses a free-surface upper boundary condition to simulate the effect of change in the rate of recharge on groundwater flow. Steady-state simulations were performed to examine the sensitivity of simulation results to assumed values for hydraulic conductivity and recharge rate. Transient simulations, covering the time period from 14,000 years in the past to 10,000 years in the future, provided insight into how patterns of groundwater flow respond to changes in climate. Simulation results suggest that rates and directions of Groundwater flow in the Culebra change with time due to interaction between recharge, movement of the water table, and the topography of the land surface. The gentle east-to-west slope of the land surface in the vicinity of the WIPP caused groundwater in the Culebra to flow toward and discharge into Nash Draw, a topographic depression. Modern-day flow directions in the Culebra reflect regional rather than local features of the topography. Changes in Groundwater flow, however, lagged behind changes in the rate of recharge. The present-day position of the water table is still adjusting to the decrease in recharge that ended 8,000 years ago. Contaminants introduced into the Culebra will travel toward the accessible environment along the Culebra rather than by leaking upward or downward into other units. Natural changes in flow over the next 10,000 years will be small and will mainly reflect future short-term wet periods

  11. Coupled multiphase flow and closure analysis of repository response to waste-generated gas at the Waste Isolation Pilot Plant (WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Freeze, G.A.; Larson, K.W. [INTERA Inc., Austin, TX (United States); Davies, P.B. [Sandia National Laboratories, Albuquerque, NM (United States)

    1995-10-01

    A long-term assessment of the Waste Isolation Pilot Plant (WIPP) repository performance must consider the impact of gas generation resulting from the corrosion and microbial degradation of the emplaced waste. A multiphase fluid flow code, TOUGH2/EOS8, was adapted to model the processes of gas generation, disposal room creep closure, and multiphase (brine and gas) fluid flow, as well as the coupling between the three processes. System response to gas generation was simulated with a single, isolated disposal room surrounded by homogeneous halite containing two anhydrite interbeds, one above and one below the room. The interbeds were assumed to have flow connections to the room through high-permeability, excavation-induced fractures. System behavior was evaluated by tracking four performance measures: (1) peak room pressure; (2) maximum brine volume in the room; (3) total mass of gas expelled from the room; and (4) the maximum gas migration distance in an interbed. Baseline simulations used current best estimates of system parameters, selected through an evaluation of available data, to predict system response to gas generation under best-estimate conditions. Sensitivity simulations quantified the effects of parameter uncertainty by evaluating the change in the performance measures in response to parameter variations. In the sensitivity simulations, a single parameter value was varied to its minimum and maximum values, representative of the extreme expected values, with all other parameters held at best-estimate values. Sensitivity simulations identified the following parameters as important to gas expulsion and migration away from a disposal room: interbed porosity; interbed permeability; gas-generation potential; halite permeability; and interbed threshold pressure. Simulations also showed that the inclusion of interbed fracturing and a disturbed rock zone had a significant impact on system performance.

  12. An analysis of the annual probability of failure of the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Greenfield, M.A. [Univ. of California, Los Angeles, CA (United States); Sargent, T.J.

    1995-11-01

    The Environmental Evaluation Group (EEG) previously analyzed the probability of a catastrophic accident in the waste hoist of the Waste Isolation Pilot Plant (WIPP) and published the results in Greenfield (1990; EEG-44) and Greenfield and Sargent (1993; EEG-53). The most significant safety element in the waste hoist is the hydraulic brake system, whose possible failure was identified in these studies as the most important contributor in accident scenarios. Westinghouse Electric Corporation, Waste Isolation Division has calculated the probability of an accident involving the brake system based on studies utilizing extensive fault tree analyses. This analysis conducted for the U.S. Department of Energy (DOE) used point estimates to describe the probability of failure and includes failure rates for the various components comprising the brake system. An additional controlling factor in the DOE calculations is the mode of operation of the brake system. This factor enters for the following reason. The basic failure rate per annum of any individual element is called the Event Probability (EP), and is expressed as the probability of failure per annum. The EP in turn is the product of two factors. One is the {open_quotes}reported{close_quotes} failure rate, usually expressed as the probability of failure per hour and the other is the expected number of hours that the element is in use, called the {open_quotes}mission time{close_quotes}. In many instances the {open_quotes}mission time{close_quotes} will be the number of operating hours of the brake system per annum. However since the operation of the waste hoist system includes regular {open_quotes}reoperational check{close_quotes} tests, the {open_quotes}mission time{close_quotes} for standby components is reduced in accordance with the specifics of the operational time table.

  13. An analysis of the annual probability of failure of the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Greenfield, M.A.; Sargent, T.J.

    1995-11-01

    The Environmental Evaluation Group (EEG) previously analyzed the probability of a catastrophic accident in the waste hoist of the Waste Isolation Pilot Plant (WIPP) and published the results in Greenfield (1990; EEG-44) and Greenfield and Sargent (1993; EEG-53). The most significant safety element in the waste hoist is the hydraulic brake system, whose possible failure was identified in these studies as the most important contributor in accident scenarios. Westinghouse Electric Corporation, Waste Isolation Division has calculated the probability of an accident involving the brake system based on studies utilizing extensive fault tree analyses. This analysis conducted for the U.S. Department of Energy (DOE) used point estimates to describe the probability of failure and includes failure rates for the various components comprising the brake system. An additional controlling factor in the DOE calculations is the mode of operation of the brake system. This factor enters for the following reason. The basic failure rate per annum of any individual element is called the Event Probability (EP), and is expressed as the probability of failure per annum. The EP in turn is the product of two factors. One is the open-quotes reportedclose quotes failure rate, usually expressed as the probability of failure per hour and the other is the expected number of hours that the element is in use, called the open-quotes mission timeclose quotes. In many instances the open-quotes mission timeclose quotes will be the number of operating hours of the brake system per annum. However since the operation of the waste hoist system includes regular open-quotes reoperational checkclose quotes tests, the open-quotes mission timeclose quotes for standby components is reduced in accordance with the specifics of the operational time table

  14. Long-term CH3Br and CH3Cl flux measurements in temperate salt marshes

    Directory of Open Access Journals (Sweden)

    M. R. Heal

    2010-11-01

    Full Text Available Fluxes of CH3Br and CH3Cl and their relationship with potential drivers such as sunlight, temperature and soil moisture, were monitored at fortnightly to monthly intervals for more than two years at two contrasting temperate salt marsh sites in Scotland. Manipulation experiments were conducted to further investigate possible links between drivers and fluxes. Fluxes followed both seasonal and diurnal trends with highest fluxes during summer days and lowest (negative fluxes during winter nights. Mean (± 1 sd annually and diurnally-weighted net emissions from the two sites were found to be 300 ± 44 ng m−2 h−1 for CH3Br and 662 ± 266 ng m−2 h−1 for CH3Cl. The fluxes from this work are similar to findings from this and other research groups for salt marshes in cooler, higher latitude climates, but lower than values from salt marshes in the Mediterranean climate of southern California. Statistical analysis generally did not demonstrate a strong link between temperature or sunlight levels and methyl halide fluxes, although it is likely that temperatures have a weak direct influence on emissions, and both certainly have indirect influence via the annual and daily cycles of the vegetation. CH3Cl flux magnitudes from different measurement locations depended on the plant species enclosed whereas such dependency was not discernible for CH3Br fluxes. In 14 out of 18 collars with vegetation CH3Br and CH3Cl net fluxes were significantly positively correlated. The CH3Cl/CH3Br net-emission mass ratio was 2.2, a magnitude lower than mass ratios of global methyl halide budgets (~22 or emissions from tropical rainforests (~60. This is likely due to preference for CH3Br production by the relatively high bromine content in the salt marsh plant material. Extrapolation based solely on data from this study yields salt marsh contributions of 0.5–3.2% and 0.05–0.33%, respectively, of currently-estimated total global production of CH3Br and CH3Cl, but actual

  15. The ChArMEx database

    Science.gov (United States)

    Ferré, Hélène; Belmahfoud, Nizar; Boichard, Jean-Luc; Brissebrat, Guillaume; Cloché, Sophie; Descloitres, Jacques; Fleury, Laurence; Focsa, Loredana; Henriot, Nicolas; Mière, Arnaud; Ramage, Karim; Vermeulen, Anne; Boulanger, Damien

    2015-04-01

    The Chemistry-Aerosol Mediterranean Experiment (ChArMEx, http://charmex.lsce.ipsl.fr/) aims at a scientific assessment of the present and future state of the atmospheric environment in the Mediterranean Basin, and of its impacts on the regional climate, air quality, and marine biogeochemistry. The project includes long term monitoring of environmental parameters , intensive field campaigns, use of satellite data and modelling studies. Therefore ChARMEx scientists produce and need to access a wide diversity of data. In this context, the objective of the database task is to organize data management, distribution system and services, such as facilitating the exchange of information and stimulating the collaboration between researchers within the ChArMEx community, and beyond. The database relies on a strong collaboration between ICARE, IPSL and OMP data centers and has been set up in the framework of the Mediterranean Integrated Studies at Regional And Locals Scales (MISTRALS) program data portal. ChArMEx data, either produced or used by the project, are documented and accessible through the database website: http://mistrals.sedoo.fr/ChArMEx. The website offers the usual but user-friendly functionalities: data catalog, user registration procedure, search tool to select and access data... The metadata (data description) are standardized, and comply with international standards (ISO 19115-19139; INSPIRE European Directive; Global Change Master Directory Thesaurus). A Digital Object Identifier (DOI) assignement procedure allows to automatically register the datasets, in order to make them easier to access, cite, reuse and verify. At present, the ChArMEx database contains about 120 datasets, including more than 80 in situ datasets (2012, 2013 and 2014 summer campaigns, background monitoring station of Ersa...), 25 model output sets (dust model intercomparison, MEDCORDEX scenarios...), a high resolution emission inventory over the Mediterranean... Many in situ datasets

  16. ChIP-chip versus ChIP-seq: Lessons for experimental design and data analysis

    Science.gov (United States)

    2011-01-01

    Background Chromatin immunoprecipitation (ChIP) followed by microarray hybridization (ChIP-chip) or high-throughput sequencing (ChIP-seq) allows genome-wide discovery of protein-DNA interactions such as transcription factor bindings and histone modifications. Previous reports only compared a small number of profiles, and little has been done to compare histone modification profiles generated by the two technologies or to assess the impact of input DNA libraries in ChIP-seq analysis. Here, we performed a systematic analysis of a modENCODE dataset consisting of 31 pairs of ChIP-chip/ChIP-seq profiles of the coactivator CBP, RNA polymerase II (RNA PolII), and six histone modifications across four developmental stages of Drosophila melanogaster. Results Both technologies produce highly reproducible profiles within each platform, ChIP-seq generally produces profiles with a better signal-to-noise ratio, and allows detection of more peaks and narrower peaks. The set of peaks identified by the two technologies can be significantly different, but the extent to which they differ varies depending on the factor and the analysis algorithm. Importantly, we found that there is a significant variation among multiple sequencing profiles of input DNA libraries and that this variation most likely arises from both differences in experimental condition and sequencing depth. We further show that using an inappropriate input DNA profile can impact the average signal profiles around genomic features and peak calling results, highlighting the importance of having high quality input DNA data for normalization in ChIP-seq analysis. Conclusions Our findings highlight the biases present in each of the platforms, show the variability that can arise from both technology and analysis methods, and emphasize the importance of obtaining high quality and deeply sequenced input DNA libraries for ChIP-seq analysis. PMID:21356108

  17. Chôra : Creation and Pathology

    DEFF Research Database (Denmark)

    Isar, Nicoletta

    2009-01-01

    Plato's dialogue the Timaeus describes not only the making of the cosmos (order), but also the condition of what is not order, neither for the human body nor for the universe. What is disorder in cosmogonic terms it is disease for the human body. Timaeus applies to the concept chôra in discussing...

  18. Palladium Catalyzed Allylic C-H Alkylation

    DEFF Research Database (Denmark)

    Engelin, Casper Junker; Fristrup, Peter

    2011-01-01

    an acetate ion coordinated to Pd. Several of the reported systems rely on benzoquinone for re-oxidation of the active catalyst. The scope for nucleophilic addition in allylic C-H alkylation is currently limited, due to demands on pKa of the nucleophile. This limitation could be due to the pH dependence...

  19. Rate constants for the reactions of OH with CH3Cl, CH2Cl2, CHCl3, and CH3Br

    Science.gov (United States)

    Hsu, K.-J.; Demore, W. B.

    1994-01-01

    Rate constants for the reactions of OH with CH3Cl, CH2Cl2, CHCl3, and CH3Br have been measured by a relative rate technique in which the reaction rate of each compound was compared to that of HFC-152a (CH3CHF2) and (for CH2Cl2) HFC-161 (CH3CH2F). Using absolute rate constants for HFC-152a and HFC-161, which we have determined relative to those for CH4, CH3CCl3, and C2H6, temperature dependent rate constants of both compounds were derived. The derived rate constant for CH3Br is in good agreement with recent absolute measurements. However, for the chloromethanes all the rate constants are lower at atmospheric temperatures than previously reported, especially for CH2Cl2 where the present rate constant is about a factor of 1.6 below the JPL 92-20 value. The new rate constant appears to resolve a discrepancy between the observed atmospheric concentrations and those calculated from the previous rate constant and estimated release rates.

  20. ChIP-enriched in silico targets (ChEST), a ChIP-on-chip approach applied to analyzing skeletal muscle genes.

    Science.gov (United States)

    Junion, Guillaume; Jagla, Krzysztof

    2012-01-01

    Mapping the cis-regulatory modules (CRMs) to which bind myogenic transcription factors is an -obligatory step towards understanding gene regulatory networks governing muscle development and function. This can be achieved in silico or by chromatin immunoprecipitation (ChIP) approaches. We have developed a ChIP-enriched in silico targets (ChEST) strategy designed for mapping the CRMs by combining in silico and ChIP methods. ChEST involves a software-assisted prediction of transcription factor (TF) - specific CRMs, which are spotted to produce a computed genomic CRM microarray. In parallel, the in vivo pool of targets of a given TF is isolated by ChIP and used as a probe for hybridization with the array generated. Here we describe ChEST strategy applied to identify direct targets of Myogenic Enhancer Factor, Dmef2 in Drosophila embryos.

  1. The ChArMEx database

    Science.gov (United States)

    Ferré, Hélène; Descloitres, Jacques; Fleury, Laurence; Boichard, Jean-Luc; Brissebrat, Guillaume; Focsa, Loredana; Henriot, Nicolas; Mastrorillo, Laurence; Mière, Arnaud; Vermeulen, Anne

    2013-04-01

    The Chemistry-Aerosol Mediterranean Experiment (ChArMEx, http://charmex.lsce.ipsl.fr/) aims at a scientific assessment of the present and future state of the atmospheric environment in the Mediterranean Basin, and of its impacts on the regional climate, air quality, and marine biogeochemistry. The project includes long term monitoring of environmental parameters, intensive field campaigns, use of satellite data and modelling studies. Therefore ChARMEx scientists produce and need to access a wide diversity of data. In this context, the objective of the database task is to organize data management, distribution system and services such as facilitating the exchange of information and stimulating the collaboration between researchers within the ChArMEx community, and beyond. The database relies on a strong collaboration between OMP and ICARE data centres and falls within the scope of the Mediterranean Integrated Studies at Regional And Locals Scales (MISTRALS) program data portal. All the data produced by or of interest for the ChArMEx community will be documented in the data catalogue and accessible through the database website: http://mistrals.sedoo.fr/ChArMEx. The database website offers different tools: - A registration procedure which enables any scientist to accept the data policy and apply for a user database account. - Forms to document observations or products that will be provided to the database in compliance with metadata international standards (ISO 19115-19139; INSPIRE; Global Change Master Directory Thesaurus). - A search tool to browse the catalogue using thematic, geographic and/or temporal criteria. - Sorted lists of the datasets by thematic keywords, by measured parameters, by instruments or by platform type. - A shopping-cart web interface to order in situ data files. At present datasets from the background monitoring station of Ersa, Cape Corsica and from the 2012 ChArMEx pre-campaign are available. - A user-friendly access to satellite products

  2. Budoucnost benzinových dvoutaktních motorů

    OpenAIRE

    Kříž, Jakub

    2015-01-01

    Práce se zabývá historickým vývojem dvoudobých benzínových motorů od samých počátků vzniku dvoudobého cyklu, mapuje technologický vývoj těchto motorů až do dnešní doby, kde je v druhé polovině pozornost věnována přímému srovnání motoru dvoudobého se čtyřdobým v oblasti ultralightových letounů. My thesis deals with the historical development of two-stroke petrol engines from the very establishment of a two-stroke cycle, mapping the technological development of these engines up to present da...

  3. ChIA-PET2: a versatile and flexible pipeline for ChIA-PET data analysis.

    Science.gov (United States)

    Li, Guipeng; Chen, Yang; Snyder, Michael P; Zhang, Michael Q

    2017-01-09

    ChIA-PET2 is a versatile and flexible pipeline for analyzing different types of ChIA-PET data from raw sequencing reads to chromatin loops. ChIA-PET2 integrates all steps required for ChIA-PET data analysis, including linker trimming, read alignment, duplicate removal, peak calling and chromatin loop calling. It supports different kinds of ChIA-PET data generated from different ChIA-PET protocols and also provides quality controls for different steps of ChIA-PET analysis. In addition, ChIA-PET2 can use phased genotype data to call allele-specific chromatin interactions. We applied ChIA-PET2 to different ChIA-PET datasets, demonstrating its significantly improved performance as well as its ability to easily process ChIA-PET raw data. ChIA-PET2 is available at https://github.com/GuipengLi/ChIA-PET2. © The Author(s) 2016. Published by Oxford University Press on behalf of Nucleic Acids Research.

  4. Impact of genome assembly status on ChIP-Seq and ChIP-PET data mapping

    Directory of Open Access Journals (Sweden)

    Sachs Laurent

    2009-12-01

    Full Text Available Abstract Background ChIP-Seq and ChIP-PET can potentially be used with any genome for genome wide profiling of protein-DNA interaction sites. Unfortunately, it is probable that most genome assemblies will never reach the quality of the human genome assembly. Therefore, it remains to be determined whether ChIP-Seq and ChIP-PET are practicable with genome sequences other than a few (e.g. human and mouse. Findings Here, we used in silico simulations to assess the impact of completeness or fragmentation of genome assemblies on ChIP-Seq and ChIP-PET data mapping. Conclusions Most currently published genome assemblies are suitable for mapping the short sequence tags produced by ChIP-Seq or ChIP-PET.

  5. Modelling ChIP-seq Data Using HMMs.

    Science.gov (United States)

    Vinciotti, Veronica

    2017-01-01

    Chromatin ImmunoPrecipitation-sequencing (ChIP-seq) experiments have now become routine in biology for the detection of protein binding sites. In this chapter, we show how hidden Markov models can be used for the analysis of data generated by ChIP-seq experiments. We show how a hidden Markov model can naturally account for spatial dependencies in the ChIP-seq data, how it can be used in the presence of data from multiple ChIP-seq experiments under the same biological condition, and how it naturally accounts for the different IP efficiencies of individual ChIP-seq experiments.

  6. The study on the relation between the morphologic features of CT scan and DSA in the DB III dissection, and the selection of therapy and its long term prognosis

    International Nuclear Information System (INIS)

    Tsuboi, Hideyuki; Shimauchi, Akemi; Kondou, Junichiro; Sone, Takahito; Sassa, Hiromi; Maeda, Masanobu

    1994-01-01

    Thirty-eight cases of DB III dissecting aneurysm were classified into three groups according to the morphologic features of dissected aorta by dynamic CT scan and DSA in the acute phase. The relation between these morphologic features and therapy, complications and prognosis were studied. Type A (thrombosed dissection) 20 cases were treated with medical therapy only and showed good prognosis. The false lumen of 17 cases disappeared in the chronic phase. Type B (incompletely thrombosed dissection) 6 cases showed the largest aortic transverse size in the three groups. The cases having more than 5 cm transverse size of the aorta were at high risk of rupture. The prognosis of Type B was very poor with 50% mortality rate. Type C (communicated type) 12 cases were more complicated with major artery obstruction due to the progression of dissection. Among them 5 cases in the subacute phase and 1 case in the chronic phase were operated. Six cases treated with medical therapy showed an opened false lumen after 3 years and 4 months (the mean observation period). In conclusion, the type A dissection is curative with drug therapy only. On the other hand some cases of types B and C cannot be treated with drug therapy only, therefore these cases must be followed up very carefully, taking into consideration of surgical therapy. (author)

  7. Impact of artefact removal on ChIP quality metrics in ChIP-seq and ChIP-exo data.

    Directory of Open Access Journals (Sweden)

    Thomas Samuel Carroll

    2014-04-01

    Full Text Available With the advent of ChIP-seq multiplexing technologies and the subsequent increase in ChIP-seq throughput, the development of working standards for the quality assessment of ChIP-seq studies has received significant attention. The ENCODE consortium’s large scale analysis of transcription factor binding and epigenetic marks as well as concordant work on ChIP-seq by other laboratories has established a new generation of ChIP-seq quality control measures. The use of these metrics alongside common processing steps has however not been evaluated. In this study, we investigate the effects of blacklisting and removal of duplicated reads on established metrics of ChIP-seq quality and show that the interpretation of these metrics is highly dependent on the ChIP-seq preprocessing steps applied. Further to this we perform the first investigation of the use of these metrics for ChIP-exo data and make recommendations for the adaptation of the NSC statistic to allow for the assessment of ChIP-exo efficiency.

  8. Impact of artifact removal on ChIP quality metrics in ChIP-seq and ChIP-exo data

    Science.gov (United States)

    Carroll, Thomas S.; Liang, Ziwei; Salama, Rafik; Stark, Rory; de Santiago, Ines

    2014-01-01

    With the advent of ChIP-seq multiplexing technologies and the subsequent increase in ChIP-seq throughput, the development of working standards for the quality assessment of ChIP-seq studies has received significant attention. The ENCODE consortium's large scale analysis of transcription factor binding and epigenetic marks as well as concordant work on ChIP-seq by other laboratories has established a new generation of ChIP-seq quality control measures. The use of these metrics alongside common processing steps has however not been evaluated. In this study, we investigate the effects of blacklisting and removal of duplicated reads on established metrics of ChIP-seq quality and show that the interpretation of these metrics is highly dependent on the ChIP-seq preprocessing steps applied. Further to this we perform the first investigation of the use of these metrics for ChIP-exo data and make recommendations for the adaptation of the NSC statistic to allow for the assessment of ChIP-exo efficiency. PMID:24782889

  9. Zpracování obrazových ultrazvukových dat

    OpenAIRE

    Pokorný, Vojtěch

    2015-01-01

    Ultrazvuk je důležitá zobrazovací modalita využívaná v lékařství. Tato bakalářská práce obsahuje zpracování teorie týkající se fyzikálních vlastností ultrazvukového vlnění, stručný přehled historického vývoje ultrazvuku jako zobrazovací modality v medicíně, dále popisuje biofyziku šíření a biologické účinky ultrazvukových vln na tkáně a typy zobrazení výsledných snímků. Další část práce se zabývá popisem diagnostického ultrazvukového přístroje včetně nejčastěji používaných typů ultrazvukových...

  10. Rate Coefficient Measurements of the Reaction CH3 + O2 = CH3O + O

    Science.gov (United States)

    Hwang, S. M.; Ryu, Si-Ok; DeWitt, K. J.; Rabinowitz, M. J.

    1999-01-01

    Rate coefficients for the reaction CH3 + O2 = CH3O + O were measured behind reflected shock waves in a series of lean CH4-O2-Ar mixtures using hydroxyl and methyl radical diagnostics. The rate coefficients are well represented by an Arrhenius expression given as k = (1.60(sup +0.67, sub -0.47 ) x 10(exp 13) e(-15813 +/- 587 K/T)/cubic cm.mol.s. This expression, which is valid in the temperature range 1575-1822 K, supports the downward trend in the rate coefficients that has been reported in recent determinations. All measurements to date, including the present study, have been to some extent affected by secondary reactions. The complications due to secondary reactions, choice of thermochemical data, and shock-boundary layer interactions that affect the determination of the rate coefficients are examined.

  11. Rate Coefficient Measurements of the Reaction CH3+O2+CH3O+O

    Science.gov (United States)

    Hwang, S. M.; Ryu, Si-Ok; DeWitt, K. J.; Rabinowitz, M. J.

    1999-01-01

    Rate coefficients for the reaction CH3 + O2 = CH3O + O were measured behind reflected shock waves in a series of lean CH4-O2-Ar mixtures using hydroxyl and methyl radical diagnostics. The rate coefficients are well represented by an Arrhenius expression given as k = (1.60(sup +0.67, -0.47)) X 10(exp 13) exp(- 15813 +/- 587 K/T)cc/mol s. This expression, which is valid in the temperature range 1575-1822 K, supports the downward trend in the rate coefficients that has been reported in recent determinations. All measurements to date, including the present study, have been to some extent affected by secondary reactions. The complications due to secondary reactions, choice of thermochemical data, and shock-boundary layer interactions that affect the determination of the rate coefficients are examined.

  12. Bimolecular reaction of CH3 + CO in solid p-H2: infrared absorption of acetyl radical (CH3CO) and CH3-CO complex.

    Science.gov (United States)

    Das, Prasanta; Lee, Yuan-Pern

    2014-06-28

    We have recorded infrared spectra of acetyl radical (CH3CO) and CH3-CO complex in solid para-hydrogen (p-H2). Upon irradiation at 248 nm of CH3C(O)Cl/p-H2 matrices, CH3CO was identified as the major product; characteristic intense IR absorption features at 2990.3 (ν9), 2989.1 (ν1), 2915.6 (ν2), 1880.5 (ν3), 1419.9 (ν10), 1323.2 (ν5), 836.6 (ν7), and 468.1 (ν8) cm(-1) were observed. When CD3C(O)Cl was used, lines of CD3CO at 2246.2 (ν9), 2244.0 (ν1), 1866.1 (ν3), 1046.7 (ν5), 1029.7 (ν4), 1027.5 (ν10), 889.1 (ν6), and 723.8 (ν7) cm(-1) appeared. Previous studies characterized only three vibrational modes of CH3CO and one mode of CD3CO in solid Ar. In contrast, upon photolysis of a CH3I/CO/p-H2 matrix with light at 248 nm and subsequent annealing at 5.1 K before re-cooling to 3.2 K, the CH3-CO complex was observed with characteristic IR features at 3165.7, 3164.5, 2150.1, 1397.6, 1396.4, and 613.0 cm(-1). The assignments are based on photolytic behavior, observed deuterium isotopic shifts, and a comparison of observed vibrational wavenumbers and relative IR intensities with those predicted with quantum-chemical calculations. This work clearly indicates that CH3CO can be readily produced from photolysis of CH3C(O)Cl because of the diminished cage effect in solid p-H2 but not from the reaction of CH3 + CO because of the reaction barrier. Even though CH3 has nascent kinetic energy greater than 87 kJ mol(-1) and internal energy ∼42 kJ mol(-1) upon photodissociation of CH3I at 248 nm, its energy was rapidly quenched so that it was unable to overcome the barrier height of ∼27 kJ mol(-1) for the formation of CH3CO from the CH3 + CO reaction; a barrierless channel for formation of a CH3-CO complex was observed instead. This rapid quenching poses a limitation in production of free radicals via bimolecular reactions in p-H2.

  13. Studie typových řad pneumatikových válců

    OpenAIRE

    Doleček, Ladislav

    2010-01-01

    Tato bakalářská práce je studií stavebních strojů, pneumatikových válců. Práce popisuje základní poznatky z oblasti hutnění materiálů. Obsahuje technologické, technické a provozní parametry pneumatikových válců a celkové zhodnocení jednotlivých typů pneumatikových válců od různých výrobců v rámci hmotnostních skupin válců. This bachelor´s thesis is study of building machines pneu tyred rollers. The thesis describes basic knowledges of compaction materials. The thesis contains technological...

  14. Laboratory Spectra of Mixtures of CH4, C2H6, and CH3OH

    Science.gov (United States)

    Mastrapa, Rachel; Berry, Matthew T.; Sandford, Scott

    2011-01-01

    Infrared spectroscopy is commonly used as a tool for identifying the composition of objects in the Solar System and beyond. Using laboratory spectra, optical constants can be calculated and used to create model spectra for comparison to spectra obtained from infrared telescopes. In this study, the optical constants of mixtures of simple organics, including CH4, C2H6, and CH3OH were calculated from 15 to 70 K, in the frequency range of 9000-500 cm(sup -1) (1.1-20 micrometers), at a spectral resolution of 1 cm(sup -1).

  15. Methane Provenance Determined by CH2D2 and 13CH3D Abundances

    Science.gov (United States)

    Kohl, I. E.; Giunta, T.; Warr, O.; Ash, J. L.; Ruffine, L.; Sherwood Lollar, B.; Young, E. D.

    2017-12-01

    Determining the provenance of naturally occurring methane gases is of major interest to energy companies and atmospheric climate modelers, among others. Bulk isotopic compositions and other geochemical tracers sometimes fail to provide definitive determinations of sources of methane due to complications from mixing and complicated chemical pathways of origin. Recent measurements of doubly-substituted isotopologues of methane, CH2D2 (UCLA) and 13CH3D (UCLA, CalTech, and MIT) have allowed for major improvements in sourcing natural methane gases. Early work has focused on formation temperatures obtained when the relative abundances of both doubly-substituted mass-18 species are consistent with internal equilibrium. When methane gases do not plot on the thermodynamic equilibrium curve in D12CH2D2 vs D13CH3D space, temperatures determined from D13CH3D values alone are usually spurious, even when appearing reasonable. We find that the equilibrium case is actually rare and almost exclusive to thermogenic gases produced at temperatures exceeding 100°C. All other relevant methane production processes appear to generate gases that are not in isotopologue-temperature equilibrium. When gases show departures from equilibrium as determined by the relationship between CH2D2 and 13CH3D abundances, data fall within empirically defined fields representing formation pathways. These fields are thus far consistent between different geological settings and and between lab experiments and natural samples. We have now defined fields for thermogenic gas production, microbial methanogenesis, low temperature abiotic (Sabatier) synthesis and higher temperature FTT synthesis. The majority of our natural methane data can be explained by mixing between end members originating within these production fields. Mixing can appear complex, resulting in both hyper-clumped and anti-clumped isotopologue abundances. In systems where mixtures dominate and end-members are difficult to sample, mixing models

  16. Chromatin immunoprecipitation (ChIP) of plant transcription factors followed by sequencing (ChIP-SEQ) or hybridization to whole genome arrays (ChIP-CHIP)

    NARCIS (Netherlands)

    Kaufmann, K.; Muiño, J.M.; Østerås, M.; Farinelli, L.; Krajewski, P.; Angenent, G.C.

    2010-01-01

    Chromatin immunoprecipitation (ChIP) is a powerful technique to study interactions between transcription factors (TFs) and DNA in vivo. For genome-wide de novo discovery of TF-binding sites, the DNA that is obtained in ChIP experiments needs to be processed for sequence identification. The sequences

  17. Linking rhizospheric CH4 oxidation and net CH4 emissions in an arctic wetland based on 13CH4 labeling of mesocosms

    DEFF Research Database (Denmark)

    Nielsen, Cecilie Skov; Michelsen, Anders; Ambus, Per

    2017-01-01

    Aims: Poorly drained arctic ecosystems are potential large emitters of methane (CH4) due to their high soil organic carbon content and low oxygen availability. In wetlands, aerenchymatous plants transport CH4 from the soil to the atmosphere, but concurrently transport O2 to the rhizosphere, which...

  18. Výpočet rovnovážných stavů ve vysokolegovaných chromových ocelích

    Czech Academy of Sciences Publication Activity Database

    Unucka, P.; Foret, R.; Svoboda, Milan; Kroupa, Aleš

    2003-01-01

    Roč. 76, č. 290 (2003), s. 223-227 ISSN 1429-6055. [Mezinárodní symposium /18./ Struktura a vlastnosti konstrukčních materiálů a výrobků. Svratka, 25.11.2003-27.11.2003] R&D Projects: GA ČR GA106/03/0636 Institutional research plan: CEZ:AV0Z2041904 Keywords : thermodynamic calculation * high-Cr steels * phase precipitation Subject RIV: BM - Solid Matter Physics ; Magnetism

  19. Syntéza a studium kompozitních pigmentů v nátěrových hmotách

    OpenAIRE

    Hájková, Tereza; Kalendová, Andréa

    2016-01-01

    Cílem této práce bylo studium vlastností syntetizovaných pigmentů se strukturou molybdenanů a wolframanů. Pro studium korozně-inhibičních vlastností byly syntetizovány molybdenany a wolframany s obsahem Sr2+, Zn2+ a Fe3+. Celkem bylo připraveno 6 pigmentů, které byly použity pro formulaci nátěrových hmot při hodnotách objemové koncentrace pigmentu (OKP) = 1; 5; 10 a 15 %. Chemickou oxidační polymerací byla na povrchu syntetizovaných pigmentů vyloučena vrstva vodivého polymeru polyparafenylend...

  20. Vibrational Coupling Pathways in the CH Stretch Region of CH_3OH and CH_3OD as Revealed by IR and Ftmw-Ir Spectroscopies

    Science.gov (United States)

    Twagirayezu, Sylvestre; Wang, Xiaoliang; Perry, David S.; Neill, Justin L.; Muckle, Matt T.; Pate, Brooks H.; Xu, Li-Hong

    2011-06-01

    Infrared spectra of jet-cooled CH_3OD and CH_3OH in the CH stretch region are observed by coherence-converted population transfer Fourier transform microwave-infrared (CCPT-FTMW-IR) spectroscopy (E torsional species only) and by slit-jet single resonance spectroscopy (both A and E torsional species, CH_3OH only). Previously, we reported the analysis of ν_3 symmetric CH stretch region (2750-2900 Cm-1), and the present work extends the analysis to higher frequency (2900-3020 Cm-1). The overall observed spectra contain 17 interacting vibrational bands for CH_3OD and 28 for CH_3OH. The signs and magnitudes of the torsional tunneling splittings are deduced for three CH fundamentals (ν_3, ν_9, ν_2) of both molecules and are compared to a model calculation and to ab initio theory. The number and distribution of observed vibrational bands indicate that the CH stretch bright states couple first to doorway states that are binary combinations of bending modes. In the parts of the spectrum where doorway states are present, the observed density of coupled states is comparable to the total density of vibrational states in the molecule, but where there are no doorway states, only the CH stretch fundamentals are observed. A time-dependent interpretation of the present FTMW-IR spectra indicates a fast (˜ 200 fs) initial decay of the bright state followed by second, slower redistribution (˜ 1-3 ps). The qualitative agreement of the present data with the time-dependent experiments of Iwaki and Dlott provides further support for the similarity of the fastest vibrational relaxation processes in the liquid and gas phases. Twagirayezu, S.; Clasp, T. N.; Perry, D. S.; Neill, J. L.; Muckle, M. T.; Pate, B. H. J. Phys. Chem. A 2010, 114, 6818 Iwaki, L. K.; Dlott, D. D. J. Phys. Chem. A 2000, 104, 9101

  1. ANALÝZA OXIDAČNÍCH PRODUKTŮ VYBRANÝCH BIO FLAVONOIDŮ

    Czech Academy of Sciences Publication Activity Database

    Sokolová, Romana; Degano, I.; Ramešová, Šárka; Kocábová, Jana; Fiedler, Jan; Tarábek, Ján

    2016-01-01

    Roč. 14, č. 5 (2016), s. 170-170 ISSN 0009-2770. [Sjezd chemických společností /68./. 04.09.2016-07.09.2016, Praha] Institutional support: RVO:61388955 ; RVO:61388963 Keywords : antioxidants * bio flavoides Subject RIV: CF - Physical ; Theoretical Chemistry

  2. Sequential ChIP Protocol for Profiling Bivalent Epigenetic Modifications (ReChIP).

    Science.gov (United States)

    Desvoyes, Bénédicte; Sequeira-Mendes, Joana; Vergara, Zaida; Madeira, Sofia; Gutierrez, Crisanto

    2018-01-01

    Identification of chromatin modifications, e.g., histone acetylation and methylation, among others, is widely carried out by using a chromatin immunoprecipitation (ChIP) strategy. The information obtained with these procedures is useful to gain an overall picture of modifications present in all cells of the population under study. It also serves as a basis to figure out the mechanisms of chromatin organization and gene regulation at the population level. However, the ultimate goal is to understand gene regulation at the level of single chromatin fibers. This requires the identification of chromatin modifications that occur at a given genomic location and within the same chromatin fiber. This is achieved by following a sequential ChIP strategy using two antibodies to distinguish different chromatin modifications. Here, we describe a sequential ChIP protocol (Re-ChIP), paying special attention to the controls needed and the required steps to obtain meaningful and reproducible results. The protocol is developed for young Arabidopsis seedlings but could be adapted to other plant materials.

  3. InChIKey collision resistance: an experimental testing

    Directory of Open Access Journals (Sweden)

    Pletnev Igor

    2012-12-01

    Full Text Available Abstract InChIKey is a 27-character compacted (hashed version of InChI which is intended for Internet and database searching/indexing and is based on an SHA-256 hash of the InChI character string. The first block of InChIKey encodes molecular skeleton while the second block represents various kinds of isomerism (stereo, tautomeric, etc.. InChIKey is designed to be a nearly unique substitute for the parent InChI. However, a single InChIKey may occasionally map to two or more InChI strings (collision. The appearance of collision itself does not compromise the signature as collision-free hashing is impossible; the only viable approach is to set and keep a reasonable level of collision resistance which is sufficient for typical applications. We tested, in computational experiments, how well the real-life InChIKey collision resistance corresponds to the theoretical estimates expected by design. For this purpose, we analyzed the statistical characteristics of InChIKey for datasets of variable size in comparison to the theoretical statistical frequencies. For the relatively short second block, an exhaustive direct testing was performed. We computed and compared to theory the numbers of collisions for the stereoisomers of Spongistatin I (using the whole set of 67,108,864 isomers and its subsets. For the longer first block, we generated, using custom-made software, InChIKeys for more than 3 × 1010 chemical structures. The statistical behavior of this block was tested by comparison of experimental and theoretical frequencies for the various four-letter sequences which may appear in the first block body. From the results of our computational experiments we conclude that the observed characteristics of InChIKey collision resistance are in good agreement with theoretical expectations.

  4. Isotopic signatures of anthropogenic CH4 sources in Alberta, Canada

    Science.gov (United States)

    Lopez, M.; Sherwood, O. A.; Dlugokencky, E. J.; Kessler, R.; Giroux, L.; Worthy, D. E. J.

    2017-09-01

    A mobile system was used for continuous ambient measurements of stable CH4 isotopes (12CH4 and 13CH4) and ethane (C2H6). This system was used during a winter mobile campaign to investigate the CH4 isotopic signatures and the C2H6/CH4 ratios of the main anthropogenic sources of CH4 in the Canadian province of Alberta. Individual signatures were derived from δ13CH4 and C2H6 measurements in plumes arriving from identifiable single sources. Methane emissions from beef cattle feedlots (n = 2) and landfill (n = 1) had δ13CH4 signatures of -66.7 ± 2.4‰ and -55.3 ± 0.2‰, respectively. The CH4 emissions associated with the oil or gas industry had distinct δ13CH4 signatures, depending on the formation process. Emissions from oil storage tanks (n = 5) had δ13CH4 signatures ranging from -54.9 ± 2.9‰ to -60.6 ± 0.6‰ and non-detectable C2H6, characteristic of secondary microbial methanogenesis in oil-bearing reservoirs. In contrast, CH4 emissions associated with natural gas facilities (n = 8) had δ13CH4 signatures ranging from -41.7 ± 0.7‰ to -49.7 ± 0.7‰ and C2H6/CH4 molar ratios of 0.10 for raw natural gas to 0.04 for processed/refined natural gas, consistent with thermogenic origins. These isotopic signatures and C2H6/CH4 ratios have been used for source discrimination in the weekly atmospheric measurements of stable CH4 isotopes over a two-month winter period at the Lac La Biche (LLB) measurement station, located in Alberta, approximately 200 km northeast of Edmonton. The average signature of -59.5 ± 1.4‰ observed at LLB is likely associated with transport of air after passing over oil industry sources located south of the station.

  5. Syntéza a vlastnosti substituovaných triazolů - acyklických analog ribavirinu

    Czech Academy of Sciences Publication Activity Database

    Česnek, Michal; Dračínský, Martin; Holý, Antonín

    2008-01-01

    Roč. 102, č. 8 (2008), s. 700 ISSN 0009-2770. [60. jubilejní sjezd asociací českých a slovenských chemických společností. 01.09.2008-04.09.2008, Olomouc] R&D Projects: GA MŠk 1M0508 Institutional research plan: CEZ:AV0Z40550506 Keywords : acyclic analogues of ribavirin * triazole Subject RIV: CC - Organic Chemistry

  6. Hydrogen abstraction from CH3NH2, (CH3)2 NH, and (CH3)3 N by HO˙2 radicals: A theoretical study

    Science.gov (United States)

    Shi, J. C.; Shang, Y. L.; Du, S. Y.; Luo, S. N.

    2018-01-01

    Hydrogen abstraction from CH3NH2, (CH3)2 NH, and (CH3)3 N by HO˙2 radicals, is investigated via quantum chemistry calculations.The B3LYP/6-31G(2df, p) method is employed in geometry optimizations, frequencies, and intrinsic reaction coordinate calculations. The G4 method is applied in energy and thermodynamical property calculations. Rate constants are obtained from variation transition state theory and conventional transition state theory calculations with one-dimensional hindered rotor treatment and Eckart tunneling correction. A branching ratio analysis for each reaction system is further performed.

  7. Chédiak–Higashi syndrome

    Directory of Open Access Journals (Sweden)

    Javad Ghaffari

    2013-05-01

    Full Text Available Chédiak-Higashi syndrome is a rare autosomal recessive congenital immunodeficiency mainly characterized by a condition called oculo-cutaneous albinism. The affected subjects have light-colored hair, vision problems, blood clotting (coagulation abnormalities and in adulthood varying neurologic disorders. Recurrent infections, particularly viral infection with other disorders in childhood are usually life threatening. It has demonstrated mutations throughout the CHS1/LYST gene. The nature of the mutation can be a predictor of the severity of the disease. The current therapeutic options are: Antibiotics, chemotherapy and bone marrow transplantation. This review will discuss the clinical and molecular aspects of this syndrome for better understanding of the factors that may cause abnormalities.

  8. δ13C-CH4 in ice core samples

    DEFF Research Database (Denmark)

    Sperlich, Peter

    caused by increased tropical wetland CH4 sources, the δ13C-CH4 variability on glacial-interglacial time scales correlates well with a range of parameters that are likely to impact atmospheric δ13C-CH4 through variations in microbial CH4 formation pathways, vegetation composition and the ratio of biogenic...... versus pyrogenic CH4 emissions....

  9. Degradace inkoustových výtisků

    OpenAIRE

    Stančík, Jiří

    2010-01-01

    Technologie inkjetového tisku se v posledním desetiletí stala velmi populární především pro tisk digitálních fotografií. Spotřebitelé mají na výběr z velkého množství jak originálních, tak levnějších alternativních inkoustů i tiskových médií. Otázkou ale je, zda lze pomocí levnějších výrobků získat také srovnatelnou kvalitu výtisku. To je jeden z důvodů, proč je důležité testovat vlastnosti takových výtisků. Existuje několik způsobů jak testovat světlostálost inkoustových výtisků: dlouhodobé ...

  10. In Silico Pooling of ChIP-seq Control Experiments

    Science.gov (United States)

    Sun, Guannan; Srinivasan, Rajini; Lopez-Anido, Camila; Hung, Holly A.; Svaren, John; Keleş, Sündüz

    2014-01-01

    As next generation sequencing technologies are becoming more economical, large-scale ChIP-seq studies are enabling the investigation of the roles of transcription factor binding and epigenome on phenotypic variation. Studying such variation requires individual level ChIP-seq experiments. Standard designs for ChIP-seq experiments employ a paired control per ChIP-seq sample. Genomic coverage for control experiments is often sacrificed to increase the resources for ChIP samples. However, the quality of ChIP-enriched regions identifiable from a ChIP-seq experiment depends on the quality and the coverage of the control experiments. Insufficient coverage leads to loss of power in detecting enrichment. We investigate the effect of in silico pooling of control samples within multiple biological replicates, multiple treatment conditions, and multiple cell lines and tissues across multiple datasets with varying levels of genomic coverage. Our computational studies suggest guidelines for performing in silico pooling of control experiments. Using vast amounts of ENCODE data, we show that pairwise correlations between control samples originating from multiple biological replicates, treatments, and cell lines/tissues can be grouped into two classes representing whether or not in silico pooling leads to power gain in detecting enrichment between the ChIP and the control samples. Our findings have important implications for multiplexing samples. PMID:25380244

  11. In silico pooling of ChIP-seq control experiments.

    Directory of Open Access Journals (Sweden)

    Guannan Sun

    Full Text Available As next generation sequencing technologies are becoming more economical, large-scale ChIP-seq studies are enabling the investigation of the roles of transcription factor binding and epigenome on phenotypic variation. Studying such variation requires individual level ChIP-seq experiments. Standard designs for ChIP-seq experiments employ a paired control per ChIP-seq sample. Genomic coverage for control experiments is often sacrificed to increase the resources for ChIP samples. However, the quality of ChIP-enriched regions identifiable from a ChIP-seq experiment depends on the quality and the coverage of the control experiments. Insufficient coverage leads to loss of power in detecting enrichment. We investigate the effect of in silico pooling of control samples within multiple biological replicates, multiple treatment conditions, and multiple cell lines and tissues across multiple datasets with varying levels of genomic coverage. Our computational studies suggest guidelines for performing in silico pooling of control experiments. Using vast amounts of ENCODE data, we show that pairwise correlations between control samples originating from multiple biological replicates, treatments, and cell lines/tissues can be grouped into two classes representing whether or not in silico pooling leads to power gain in detecting enrichment between the ChIP and the control samples. Our findings have important implications for multiplexing samples.

  12. Ir-catalyzed C-H silylations of phenyldeazapurines

    Czech Academy of Sciences Publication Activity Database

    Sabat, Nazarii; Poštová Slavětínská, Lenka; Hocek, Michal

    2015-01-01

    Roč. 56, č. 49 (2015), s. 6860-6862 ISSN 0040-4039 Institutional support: RVO:61388963 Keywords : C-H silylation * deazapurines * iridium catalysis * C-H activations Subject RIV: CC - Organic Chemistry Impact factor: 2.347, year: 2015

  13. Central cholinergic pathways in the rat: an overview based on an alternative nomenclature (Ch1-Ch6).

    Science.gov (United States)

    Mesulam, M M; Mufson, E J; Wainer, B H; Levey, A I

    1983-12-01

    Monoclonal antibodies to choline acetyltransferase and a histochemical method for the concurrent demonstration of acetylcholinesterase and horseradish peroxidase were used to investigate the organization of ascending cholinergic pathways in the central nervous system of the rat. The cortical mantle, the amygdaloid complex, the hippocampal formation, the olfactory bulb and the thalamic nuclei receive their cholinergic innervation principally, from cholinergic projection neurons of the basal forebrain and upper brainstem. On the basis of connectivity patterns, we subdivided these cholinergic neurons into six major sectors. The Ch1 and Ch2 sectors are contained within the medial septal nucleus and the vertical limb nucleus of the diagonal band, respectively. They provide the major cholinergic projections of the hippocampus. The Ch3 sector is contained mostly within the lateral portion of the horizontal limb nucleus of the diagonal band and provides the major cholinergic innervation to the olfactory bulb. The Ch4 sector includes cholinergic neurons in the nucleus basalis, and also within parts of the diagonal band nuclei. Neurons of the Ch4 sector provide the major cholinergic innervation of the cortical mantle and the amygdala. The Ch5-Ch6 sectors are contained mostly within the pedunculopontine nucleus of the pontomesencephalic reticular formation (Ch5) and within the laterodorsal tegmental gray of the periventricular area (Ch6). These sectors provide the major cholinergic innervation of the thalamus. The Ch5-Ch6 neurons also provide a minor component of the corticopetal cholinergic innervation. These central cholinergic pathways have been implicated in a variety of behaviors and especially in memory function. It appears that the age-related changes of memory function as well as some of the behavioral disturbances seen in the dementia of Alzheimer's Disease may be related to pathological alterations along central cholinergic pathways.

  14. COPAR: A ChIP-Seq Optimal Peak Analyzer.

    Science.gov (United States)

    Tang, Binhua; Wang, Xihan; Jin, Victor X

    2017-01-01

    Sequencing data quality and peak alignment efficiency of ChIP-sequencing profiles are directly related to the reliability and reproducibility of NGS experiments. Till now, there is no tool specifically designed for optimal peak alignment estimation and quality-related genomic feature extraction for ChIP-sequencing profiles. We developed open-sourced COPAR, a user-friendly package, to statistically investigate, quantify, and visualize the optimal peak alignment and inherent genomic features using ChIP-seq data from NGS experiments. It provides a versatile perspective for biologists to perform quality-check for high-throughput experiments and optimize their experiment design. The package COPAR can process mapped ChIP-seq read file in BED format and output statistically sound results for multiple high-throughput experiments. Together with three public ChIP-seq data sets verified with the developed package, we have deposited COPAR on GitHub under a GNU GPL license.

  15. Defining bacterial regulons using ChIP-seq.

    Science.gov (United States)

    Myers, Kevin S; Park, Dan M; Beauchene, Nicole A; Kiley, Patricia J

    2015-09-15

    Chromatin immunoprecipitation followed by high-throughput sequencing (ChIP-seq) is a powerful method that identifies protein-DNA binding sites in vivo. Recent studies have illustrated the value of ChIP-seq in studying transcription factor binding in various bacterial species under a variety of growth conditions. These results show that in addition to identifying binding sites, correlation of ChIP-seq data with expression data can reveal important information about bacterial regulons and regulatory networks. In this chapter, we provide an overview of the current state of knowledge about ChIP-seq methodology in bacteria, from sample preparation to raw data analysis. We also describe visualization and various bioinformatic analyses of processed ChIP-seq data. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. Defining Bacterial Regulons Using ChIP-seq Methods

    Science.gov (United States)

    Myers, Kevin S.; Park, Dan M.; Beauchene, Nicole A.; Kiley, Patricia J.

    2015-01-01

    Chromatin immunoprecitation followed by high-throughput sequencing (ChIP-seq) is a powerful method that identifies protein-DNA binding sites in vivo. Recent studies have illustrated the value of ChIP-seq in studying transcription factor binding in various bacterial species under a variety of growth conditions. These results show that in addition to identifying binding sites, correlation of ChIP-seq data with expression data can reveal important information about bacterial regulons and regulatory networks. In this chapter, we provide an overview of the current state of knowledge about ChIP-seq methodology in bacteria, from sample preparation to raw data analysis. We also describe visualization and various bioinformatic analyses of processed ChIP-seq data. PMID:26032817

  17. Computational methodology for ChIP-seq analysis

    Science.gov (United States)

    Shin, Hyunjin; Liu, Tao; Duan, Xikun; Zhang, Yong; Liu, X. Shirley

    2015-01-01

    Chromatin immunoprecipitation coupled with massive parallel sequencing (ChIP-seq) is a powerful technology to identify the genome-wide locations of DNA binding proteins such as transcription factors or modified histones. As more and more experimental laboratories are adopting ChIP-seq to unravel the transcriptional and epigenetic regulatory mechanisms, computational analyses of ChIP-seq also become increasingly comprehensive and sophisticated. In this article, we review current computational methodology for ChIP-seq analysis, recommend useful algorithms and workflows, and introduce quality control measures at different analytical steps. We also discuss how ChIP-seq could be integrated with other types of genomic assays, such as gene expression profiling and genome-wide association studies, to provide a more comprehensive view of gene regulatory mechanisms in important physiological and pathological processes. PMID:25741452

  18. New superhindered polydentate polyphosphine ligands P(CH2CH2P(t)Bu2)3, PhP(CH2CH2P(t)Bu2)2, P(CH2CH2CH2P(t)Bu2)3, and their ruthenium(II) chloride complexes.

    Science.gov (United States)

    Gilbert-Wilson, Ryan; Field, Leslie D; Bhadbhade, Mohan M

    2012-03-05

    The synthesis and characterization of the extremely hindered phosphine ligands, P(CH(2)CH(2)P(t)Bu(2))(3) (P(2)P(3)(tBu), 1), PhP(CH(2)CH(2)P(t)Bu(2))(2) (PhP(2)P(2)(tBu), 2), and P(CH(2)CH(2)CH(2)P(t)Bu(2))(3) (P(3)P(3)(tBu), 3) are reported, along with the synthesis and characterization of ruthenium chloro complexes RuCl(2)(P(2)P(3)(tBu)) (4), RuCl(2)(PhP(2)P(2)(tBu)) (5), and RuCl(2)(P(3)P(3)(tBu)) (6). The bulky P(2)P(3)(tBu) (1) and P(3)P(3)(tBu) (3) ligands are the most sterically encumbered PP(3)-type ligands so far synthesized, and in all cases, only three phosphorus donors are able to bind to the metal center. Complexes RuCl(2)(PhP(2)P(2)(tBu)) (5) and RuCl(2)(P(3)P(3)(tBu)) (6) were characterized by crystallography. Low temperature solution and solid state (31)P{(1)H} NMR were used to demonstrate that the structure of RuCl(2)(P(2)P(3)(tBu)) (4) is probably analogous to that of RuCl(2)(PhP(2)P(2)(tBu)) (5) which had been structurally characterized.

  19. OpenDSA Mergesort Visualization and Exercise

    OpenAIRE

    Breakiron, Daniel

    2012-01-01

    The following is a complete list of the files included in this archive: algoviz_entry.txt breakid_final_report.doc InterviewProtocolMS.docx README.txt UserReview20120406.txt ./Final Presentation: algoviz.png breakid_final_presentation.ppt mergesort_exer_1.png mergesort_exer_2.png mergesort_exer_3.png mergesort_exer_4.png mergesort_vis_1.png mergesort_vis_2.png mergesort_vis_3.PNG ./Links: AlgoViz.org - The Algorithm Visualization Portal.ur...

  20. Vlastnosti lakových kompozitních materiálů plněných mikro- a nanočásticemi

    OpenAIRE

    Novák, Petr

    2011-01-01

    Předložená práce řeší problematiku přípravy zkušebních lakových vzorků plněných mikročásticemi slídy, nebo nanočásticemi oxidu křemičitého (SiO2). Sleduje vliv klimatických podmínek a plniva na elektrické vlastnosti kompozitních materiálů. Elektrické vlastnosti kompozitních materiálů jsou měřeny metodou dielektrické relaxační spektroskopie. Zkušební vzorky jsou tvořeny epoxidovou pryskyřicí TSA 220S a polyesterovou pryskyřicí DOLPHON XL 2102. Laky jsou modifikov