    Wind-US is a computational platform which may be used to numerically solve various sets of equations governing physical phenomena. Currently, the code supports the solution of the Euler and Navier-Stokes equations of fluid mechanics, along with supporting equation sets governing turbulent and chemically reacting flows. Wind-US is a product of the NPARC Alliance, a partnership between the NASA Glenn Research Center (GRC) and the Arnold Engineering Development Complex (AEDC) dedicated to the establishment of a national, applications-oriented flow simulation capability. The Boeing Company has also been closely associated with the Alliance since its inception, and represents the interests of the NPARC User's Association. The "Wind-US User's Guide" describes the operation and use of Wind-US, including: a basic tutorial; the physical and numerical models that are used; the boundary conditions; monitoring convergence; the files that are read and/or written; parallel execution; and a complete list of input keywords and test options. For current information about Wind-US and the NPARC Alliance, please see the Wind-US home page at http://www.grc.nasa.gov/WWW/winddocs/ and the NPARC Alliance home page at http://www.grc.nasa.gov/WWW/wind/.

  2. Wind-US Users Guide Version 3.0

    Science.gov (United States)

    Yoder, Dennis A.

    2016-01-01

    Wind-US is a computational platform which may be used to numerically solve various sets of equations governing physical phenomena. Currently, the code supports the solution of the Euler and Navier-Stokes equations of fluid mechanics, along with supporting equation sets governing turbulent and chemically reacting flows. Wind-US is a product of the NPARC Alliance, a partnership between the NASA Glenn Research Center (GRC) and the Arnold Engineering Development Complex (AEDC) dedicated to the establishment of a national, applications-oriented flow simulation capability. The Boeing Company has also been closely associated with the Alliance since its inception, and represents the interests of the NPARC User's Association. The "Wind-US User's Guide" describes the operation and use of Wind-US, including: a basic tutorial; the physical and numerical models that are used; the boundary conditions; monitoring convergence; the files that are read and/or written; parallel execution; and a complete list of input keywords and test options. For current information about Wind-US and the NPARC Alliance, please see the Wind-US home page at http://www.grc.nasa.gov/WWW/winddocs/ and the NPARC Alliance home page at http://www.grc.nasa.gov/WWW/wind/. This manual describes the operation and use of Wind-US, a computational platform which may be used to numerically solve various sets of equations governing physical phenomena. Wind-US represents a merger of the capabilities of four CFD codes - NASTD (a structured grid flow solver developed at McDonnell Douglas, now part of Boeing), NPARC (the original NPARC Alliance structured grid flow solver), NXAIR (an AEDC structured grid code used primarily for store separation analysis), and ICAT (an unstructured grid flow solver developed at the Rockwell Science Center and Boeing).

  3. Small Wind Electric Systems: A U.S. Consumer's Guide

    International Nuclear Information System (INIS)

    O'Dell, K.

    2001-01-01

    The U.S. Consumer's Guide for Small Wind Electric systems provides consumers with enough information to help them determine if a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include: how to make your home more energy efficient, how to choose the right size turbine, the parts of a wind electric system, determining if there is enough wind resource on your site, choosing the best site for your turbine, connecting your system to the utility grid, and if it's possible to become independent of the utility grid using wind energy

  4. Wind and Solar Energy Resource Assessment for Navy Installations in the Midwestern US

    Science.gov (United States)

    Darmenova, K.; Apling, D.; Higgins, G. J.; Carnes, J.; Smith, C.

    2012-12-01

    A stable supply of energy is critical for sustainable economic development and the ever-increasing demand for energy resources drives the need for alternative weather-driven renewable energy solutions such as solar and wind-generated power. Recognizing the importance of energy as a strategic resource, the Department of the Navy has focused on energy efficient solutions aiming to increase tactical and shore energy security and reduce greenhouse gas emissions. Implementing alternative energy solutions will alleviate the Navy installations demands on the National power grid, however transitioning to renewable energy sources is a complex multi-stage process that involves initial investment in resource assessment and feasibility of building solar and wind power systems in Navy's facilities. This study focuses on the wind and solar energy resource assessment for Navy installations in the Midwestern US. We use the dynamically downscaled datasets at 12 km resolution over the Continental US generated with the Weather Research and Forecasting (WRF) model to derive the wind climatology in terms of wind speed, direction, and wind power at 20 m above the surface for 65 Navy facilities. In addition, we derived the transmissivity of the atmosphere, diffuse radiation fraction, cloud cover and seasonal energy potential for a zenith facing surface with unobstructed horizon for each installation location based on the results of a broadband radiative transfer model and our cloud database based on 17-years of GOES data. Our analysis was incorporated in a GIS framework in combination with additional infrastructure data that enabled a synergistic resource assessment based on the combination of climatological and engineering factors.

  5. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  6. Flow Simulation of Modified Duct System Wind Turbines Installed on Vehicle

    Science.gov (United States)

    Rosly, N.; Mohd, S.; Zulkafli, M. F.; Ghafir, M. F. Abdul; Shamsudin, S. S.; Muhammad, W. N. A. Wan

    2017-10-01

    This study investigates the characteristics of airflow with a flow guide installed and output power generated by wind turbine system being installed on a pickup truck. The wind turbine models were modelled by using SolidWorks 2015 software. In order to investigate the characteristic of air flow inside the wind turbine system, a computer simulation (by using ANSYS Fluent software) is used. There were few models being designed and simulated, one without the rotor installed and another two with rotor installed in the wind turbine system. Three velocities being used for the simulation which are 16.7 m/s (60 km/h), 25 m/s (90 km/h) and 33.33 m/s (120 km/h). The study proved that the flow guide did give an impact to the output power produced by the wind turbine system. The predicted result from this study is the velocity of the air inside the ducting system of the present model is better that reference model. Besides, the flow guide implemented in the ducting system gives a big impact on the characteristics of the air flow.

  7. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Baldock, Nick [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Sevilla, Fernando [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Redfern, Robin [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Storey, Alexis [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Kempenaar, Anton [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Elkinton, Chris [Garrad Hassan America, Inc., San Diego, CA (United States)

    2014-12-19

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model

  8. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  9. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Oteri, F.; Sinclair, K.

    2012-03-01

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  10. The VolturnUS 1:8 Floating Wind Turbine: Design, Construction, Deployment, Testing, Retrieval, and Inspection of the First Grid-Connected Offshore Wind Turbine in US

    Energy Technology Data Exchange (ETDEWEB)

    Dagher, Habib [Univ. of Maine, Orono, ME (United States); Viselli, Anthony [Univ. of Maine, Orono, ME (United States); Goupee, Andrew [Univ. of Maine, Orono, ME (United States); Kimball, Richard [Maine Maritime Academy, Castine, ME (United States); Allen, Christopher [Univ. of Maine, Orono, ME (United States)

    2017-08-15

    Volume II of the Final Report for the DeepCwind Consortium National Research Program funded by US Department of Energy Award Number: DE-EE0003278.001 summarizes the design, construction, deployment, testing, numerical model validation, retrieval, and post-deployment inspection of the VolturnUS 1:8-scale floating wind turbine prototype deployed off Castine, Maine on June 2nd, 2013. The 1:8 scale VolturnUS design served as a de-risking exercise for a commercial multi-MW VolturnUS design. The American Bureau of Shipping Guide for Building and Classing Floating Offshore Wind Turbine Installations was used to design the prototype. The same analysis methods, design methods, construction techniques, deployment methods, mooring, and anchoring planned for full-scale were used. A commercial 20kW grid-connected turbine was used and was the first offshore wind turbine in the US.

  11. Statistical analysis of installed wind capacity in the United States

    International Nuclear Information System (INIS)

    Staid, Andrea; Guikema, Seth D.

    2013-01-01

    There is a large disparity in the amount of wind power capacity installed in each of the states in the U.S. It is often thought that the different policies of individual state governments are the main reason for these differences, but this may not necessarily be the case. The aim of this paper is to use statistical methods to study the factors that have the most influence on the amount of installed wind capacity in each state. From this analysis, we were able to use these variables to accurately predict the installed wind capacity and to gain insight into the driving factors for wind power development and the reasons behind the differences among states. Using our best model, we find that the most important variables for explaining the amount of wind capacity have to do with the physical and geographic characteristics of the state as opposed to policies in place that favor renewable energy. - Highlights: • We conduct a statistical analysis of factors influencing wind capacity in the U.S. • We find that state policies do not strongly influence the differences among states. • Driving factors are wind resources, cropland area, and available percentage of land

  12. Benchmarking U.S. Small Wind Costs with the Distributed Wind Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Poehlman, Eric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-10-04

    The objective of this report is to benchmark costs for small wind projects installed in the United States using a distributed wind taxonomy. Consequently, this report is a starting point to help expand the U.S. distributed wind market by informing potential areas for small wind cost-reduction opportunities and providing a benchmark to track future small wind cost-reduction progress.

  13. Small wind turbine purchasing guide : off-grid, residential, farm and small business applications

    International Nuclear Information System (INIS)

    2008-11-01

    Consumer interest in the environment and the economic advantages of using wind power are now driving interest in smaller wind turbines that range from micro battery-charging models to 300 kW tower-mounted turbines. Smaller turbines are also becoming increasingly accessible through major retail outlets. This guide discussed basic issues surrounding the purchasing, selection and installation of smaller wind turbines. Guidance related to site selection, permitting and approvals was provided, as well as recommendations related to maintenance and system performance. Information related to compliance, safety and setback and zoning restrictions was also presented. The guide was divided into 5 chapters: (1) an introduction to small wind turbines, (2) assessing site-specific expectations, (3) purchasing and permitting, (4) installation, operation and maintenance, and (6) a permitting checklist for small wind customers. Financial incentives for defraying the capital costs of small wind turbines were discussed, and guidance for determining electrical requirements was also provided. A glossary was included, as well as a list of local wind energy contractor and dealers. 3 tabs., 10 figs

  14. 2012 Market Report on U.S. Wind Technologies in Distributed Applications

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C.; Flowers, L. T.; Gagne, M. N.; Pro, B. H.; Rhoads-Weaver, H. E.; Jenkins, J. O.; Sahl, K. M.; Baranowski, R. E.

    2013-08-06

    At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined in terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $2,540/kW for utility-scale wind turbines, $2,810/kW for mid-sized wind turbines, and $6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S

  15. Comparative evaluation of different offshore wind turbine installation vessels for Korean west–south wind farm

    Directory of Open Access Journals (Sweden)

    Dang Ahn

    2017-01-01

    Full Text Available The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west–south wind farm (Test bed 100 MW, Demonstrate site 400 MW. We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel, jack-up barge, or floating crane … etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west–south wind farm.

  16. CSA guide to Canadian wind turbine codes and standards

    International Nuclear Information System (INIS)

    2008-01-01

    The Canadian wind energy sector has become one of the fastest-growing wind energy markets in the world. Growth of the industry has been supported by various government agencies. However, many projects have experienced cost over-runs or cancellations as a result of unclear regulatory requirements, and wind energy developers are currently subject to a variety of approval processes involving several different authorities. This Canadian Standards Association (CSA) guide provided general information on codes and standards related to the design, approval, installation, operation, and maintenance of wind turbines in Canada. CSA codes and standards were developed by considering 5 new standards adopted by the International Electrotechnical Commission (IEC) Technical Committee on Wind Turbines. The standards described in this document related to acoustic noise measurement techniques; power performance measurements of electricity-producing wind turbines; lightning protection for wind turbine generator systems; design requirements for turbines; and design requirements for small wind turbines. The guide addressed specific subject areas related to the development of wind energy projects that involve formal or regulatory approval processes. Subject areas included issues related to safety, environmental design considerations, site selection, and mechanical systems. Information on associated standards and codes was also included

  17. The U.S. wind market is back

    International Nuclear Information System (INIS)

    Azua, C.R. de

    2000-01-01

    The recent growth in wind energy projects in the US was spurred by supportive policies in a few states, steadily improving economics, the federal wind energy Production Tax Credit and emerging green power programs. Wind farms are springing up around the US, providing clean energy as well as an economic boon to farmers and local communities. This year's headlines announced the rebirth of the US wind energy market, as wind farms were dedicated in local communities from coast to coast. At this year's exuberant pace of development, utility-scale wind energy seems well on its way to generating 5% of the nation's electricity by 2020, the target set by the Administration and announced by Energy Secretary Bill Richardson at the wind industry's annual conference earlier this year. Wind energy projects have mushroomed throughout the country, most notably in the Midwest. In the eighteen months from July 1998 to December 1999, the American Wind Energy Association (AWEA) estimates that wind energy companies will have added almost 900 megawatts (MW) to the nation's generating capacity. At the same time, new, more efficient turbines replaced some 200 MW of aging equipment. In all, 1,096 MW of new wind generators were installed over that period, representing an investment of well over $1.1 billion and bringing American utility-scale generating capacity to over 2,500 MW

  18. U.S. Wind Energy Manufacturing & Supply Chain: A Competitive Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Fullenkamp, Patrick [Global WindNetwork, Cleveland, OH (United States)

    2014-06-15

    The Global Wind Network (GLWN) assessed the key factors that determine wind energy component manufacturing costs and pricing on a global basis in order to provide a better understanding of the factors that will help enhance the competitiveness of U.S. manufacturers, and reduce installed system costs.

  19. 20% wind by 2030: Overcoming the challenge - U.S. wind supply chain bottlenecks

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Meghan

    2010-09-15

    The U.S. Department of Energy (DOE) provided PowerAdvocate with funding to evaluate the challenges facing the supply chain and provide strategic solutions to overcoming the short and long term supply chain challenges. PowerAdvocate conducted market research and interviews with wind developers, turbine and component suppliers and offshore wind development experts. PowerAdvocate created a comprehensive model. The model includes labor statistics, wind facility cost forecasting, and component supplier manufacturing investments in order to estimate the total cost to build a supply chain that supports the DOE's 20% by 2030 wind installation goal.

  20. Prediction of Wind Energy Resources (PoWER) Users Guide

    Science.gov (United States)

    2016-01-01

    ARL-TR-7573● JAN 2016 US Army Research Laboratory Prediction of Wind Energy Resources (PoWER) User’s Guide by David P Sauter...manufacturer’s or trade names does not constitute an official endorsement or approval of the use thereof. Destroy this report when it is no longer needed. Do...not return it to the originator. ARL-TR-7573 ● JAN 2016 US Army Research Laboratory Prediction of Wind Energy Resources (PoWER

  1. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.

    2008-05-01

    This report focuses on key trends in the U.S. wind power market, with an emphasis on the latest year, and presents a wealth of data, some of which has not historically been mined by wind power analysts.

  2. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    International Nuclear Information System (INIS)

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact

  3. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  4. Technology Roadmaps: How2Guide for Wind Energy Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-01

    Whether in OECD, emerging or developing country economies, governments are increasingly looking to diversify their energy mix beyond simply fossil fuels. While wind energy is developing towards a mainstream, competitive and reliable technology, a range of barriers can delay progress, such as financing, grid integration, social acceptance and aspects of planning processes. National and regional technology roadmaps can play a key role in supporting wind energy development and implementation, helping countries to identify priorities and pathways tailored to local resources and markets. Recognising this, the IEA has started the How2Guides - a new series co-ordinated by the International Low-Carbon Energy Technology Platform to address the need for more focused guidance in the development of national roadmaps, or strategies, for specific low-carbon technologies. This builds on the success of the IEA global technology roadmap series and responds to a growing number of requests for IEA guidance to adapt the findings of the IEA global technology roadmaps to national circumstances. A successful roadmap contains a clear statement of the desired outcome, followed by a specific pathway for reaching it. The How2Guide for Wind Energy builds on the IEA well established methodology for roadmap development and shares wind specific recommendations on how to address the four phases to developing and implementing a wind energy roadmap: Planning; Visioning; Development; and Implementation. The manual also offers menus of recommendations on policy and technical options for deployment of utility-scale wind energy installations. A matrix of barriers-versus-realistic solutions options is cross-listed with considerations such as planning, development, electricity market and system, infrastructure, and finance and economics. Drawing on several case studies from around the globe, as well as on the IEA Technology Roadmap for Wind Energy, the How2Guide for Wind Energy it is intended as a

  5. Composite rotor blades for large wind energy installations

    Science.gov (United States)

    Kussmann, A.; Molly, J.; Muser, D.

    1980-01-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  6. Composite rotor blades for large wind energy installations

    Energy Technology Data Exchange (ETDEWEB)

    Kussmann, A; Molly, J P; Muser, D

    1979-06-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  7. Economically Feasible Potentials for Wind Power in China and the US

    Science.gov (United States)

    Lu, X.; McElroy, M. B.; Chris, N. P.; Tchou, J.

    2011-12-01

    The present study is intended to explore the economic feasible potentials for wind energy in China and the U.S. subject to their policy systems for renewable energy. These two countries were chosen as subject locales for three reasons: first, they are the two largest countries responsible for energy consumption and CO2 emissions; second, these two countries have the largest installed capacities and the fastest annual growth of wind power in the world; third, China and the U.S. have adopted two distinct but representative incentive policies to accelerate exploitation of the renewable energy source from wind. Investments in large-scale wind farms in China gain privileges from the concession policy established under China's Renewable Energy Law. The electricity generated from wind can be sold at a guaranteed price for a concession period (typically the first ten operational years of a wind farm) to ensure the profitability of the wind farm development. The effectiveness of this policy has been evidenced by the swift growth of total installed capacities for wind power over the past five years in China. A spatial financial model was developed to evaluate the bus-bar prices of wind-generated electricity in China following this wind concession policy. The results indicated that wind could accommodate all of the demand for electricity projected for 2030 assuming a guaranteed bus-bar price of 7.6 U.S. Cents per kWh over the concession period. It is noteworthy that the prices of wind-generated electricity could be as cheap as conventional power generation in the years following the concession period. The power market in the U.S. is more deregulated and electricity is normally traded in a bidding process an hour to a day ahead of real time. Accordingly, the market-oriented policy instrument of PTC subsidies was instituted in the U.S. to ensure the competitiveness of wind power compared to the conventional power generation in the regional power markets. The spatial financial

  8. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  9. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  10. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  11. Influence of omni-directional guide vane on the performance of cross-flow rotor for urban wind energy

    Science.gov (United States)

    Wicaksono, Yoga Arob; Tjahjana, Dominicus Danardono Dwi Prija; Hadi, Syamsul

    2018-02-01

    Vertical axis wind turbine like cross-flow rotor have some advantage there are, high self-starting torque, low noise, and high stability; so, it can be installed in the urban area to produce electricity. But, the urban area has poor wind condition, so the cross-flow rotor needs a guide vane to increase its performance. The aim of this study is to determine experimentally the effect of Omni-Directional Guide Vane (ODGV) on the performance of a cross-flow wind turbine. Wind tunnel experiment has been carried out for various configurations. The ODGV was placed around the cross-flow rotor in order to increase ambient wind environment of the wind turbine. The maximum power coefficient is obtained as Cpmax = 0.125 at 60° wind direction. It was 21.46% higher compared to cross-flow wind turbine without ODGV. This result showed that the ODGV able to increase the performance of the cross-flow wind turbine.

  12. Wind profiler installed in Antarctica

    Science.gov (United States)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  13. Location of Swedish wind power—Random or not? A quantitative analysis of differences in installed wind power capacity across Swedish municipalities

    International Nuclear Information System (INIS)

    Ek, Kristina; Persson, Lars; Johansson, Maria; Waldo, Åsa

    2013-01-01

    The amount of installed wind power varies significantly across municipalities although the financial support for wind power production and the technology available is identical in all Swedish municipalities. This study analyses how local differences between municipalities, such as local wind prerequisites and socioeconomic conditions, might explain the establishment of wind power. The analysis is carried out for a cross section of Swedish municipalities. The time periods before and after 2006 are analyzed separately; and results reveal that the factors affecting wind power establishments are different between the two periods. In the later time period we found a statistically significant positive relationship between good wind resources and the presence of wind power as well as with the amount of wind energy installed. This result is consistent with the idea that the first wind power investments in Sweden were highly affected by individual wind energy enthusiasts, while in the more recent large-scale investments market-based judgments about future profitability may have become increasingly important. In addition, previous experience seems to be a factor that in itself facilitates additional future wind power establishments, thereby pointing to the role of accumulated institutional capacity. - Highlights: ► Local differences in installed wind power capacity in Sweden is analysed. ► The amount of installed wind power capacity varies significantly in time and space. ► Results reveal different determinants of installed capacity before/after 2006. ► Good wind resources have become increasingly important over time. ► Previous experience of wind power has a positive impact on installed capacity

  14. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.

    2007-05-01

    This report--the first in what is envisioned to be an ongoing annual series--attempts to fill this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2006.

  15. On Orientation Control of Suspended Blade During Installation in Wind Turbines

    DEFF Research Database (Denmark)

    Schmidt, Lasse; Roemer, Daniel Beck; Pedersen, Henrik Clemmensen

    2015-01-01

    This paper discusses problems involved in the procedure for offshore installation of blades in wind turbines, due to wind loads. In general the high winds at sea provides for nearly optimal conditions for harvesting energy via wind turbines due to the often high wind speeds and low turbulence...... intensity. However, the very same features also call for great difficulties during installation of the wind turbine blades, making this process extremely difficult, expensive and time consuming. Often the blades are hoisted to the wind turbine hub via cranes and sought held in appropriate positions by so......-called taglines/wires, but still significant motion oscillations of blade root ends are experienced, even at rather low wind speeds. The paper considers the possibility to dampen the oscillating motions via control of the tagline lengths. The main control strategy considered, is the possibility to control...

  16. Installation and Initial Operation of DOE's 449-MHz Wind Profiling Radars on the U.S. West Coast

    Energy Technology Data Exchange (ETDEWEB)

    Flaherty, Julia E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Shaw, William J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Morris, Victor R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilczak, J. M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); White, A. B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ayers, Tom [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jordan, Jim [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); King, Clark W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-10-30

    The U.S. Department of Energy (DOE), in collaboration with the National Oceanic and Atmospheric Administration (NOAA), has recently completed the installation of three new wind profiling radars on the Washington and Oregon coasts. These systems operate at a frequency of 449 MHz and provide mean wind profiles to a height of roughly 8 km, with the maximum measurement height depending on time-varying atmospheric conditions. This is roughly half the depth of the troposphere at these latitudes. Each system is also equipped with a radio acoustic sounding system (RASS), which provides a measure of the temperature profile to heights of approximately 2 km. Other equipment deployed alongside the radar includes a surface meteorological station and GPS for column water vapor. This project began in fiscal year 2014, starting with equipment procurements and site selection. In addition, environmental reviews, equipment assembly and testing, site access agreements, and infrastructure preparations have been performed. Finally, with equipment deployment with data collection and dissemination, the primary tasks of this project have been completed. The three new wind profiling radars have been deployed at airports near Coos Bay, OR, and Astoria, OR, and at an industrial park near Forks, WA. Data are available through the NOAA Earth Systems Research Laboratory Data Display website, and will soon be made available through the DOE Atmosphere to Electrons data archive and portal as well.

  17. Wind turbine integration guide : towards a new landscape; Guide d'integration des eoliennes au territoire : vers de nouveaux paysages

    Energy Technology Data Exchange (ETDEWEB)

    Boucher, I.; Blais, P. [Quebec Ministere des Affaires Municipales et des Regions, Quebec, PQ (Canada)

    2007-07-01

    Many areas of Quebec have significant wind potential and the province has power infrastructure that allow easy connection of wind power to the electricity grid. As such, wind energy development is occurring in Quebec as part of its sustainable development strategy. Although wind power is a sustainable option, it should not interfere with the aesthetics of local landscapes. Both regional and local municipalities are faced with the challenge of planning wind farms while protecting the tourism industry and maintaining landscapes of interest, including natural and historic sites. This guide was prepared to support wind energy development in a manner that protects local landscapes. It includes examples where wind turbine arrays have been installed in harmony with the environment. It also described existing tools that enable wind turbine site planning through site characterization. This guide also allows the Ministry of Natural Resources to accompany promoters during project planning and evaluate the impact of a project on the landscape. All proposed projects are subject to conditions imposed by regional municipalities, which have jurisdiction over landscape, noise, public safety, and wildlife. Project proponents must meet both social and environmental criteria to ensure the preservation of the municipal territory and the quality of life. Regulations are in place to ensure economic development occurs in tandem with meeting the energy needs of local and regional communities. 31 refs., 1 tabs., 21 figs.

  18. Addressing Social and Institutional Barriers for Wind Energy Installations

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, L; Gonzalez, R; Varela, M [Ciemat. Madrid (Spain); Ramirez, I; Vicente, F [Consejeria de Medio Ambiente, Agricultura y Agua. Comunidad Autonoma de Murcia (Spain)

    2000-07-01

    This project has been jointly financed by the European Commission and developed within the Programme Thermie-B. The main tasks to carried out are: Revision of institutional and legal framework. The revision of institutional and legal framework of different participating countries, i. e. their comparison with the rest of the countries with a relevant role in the field of wind energy. Opinion poll carried out on the wind energy. By means of this means, one wants to test public opinion with respect to wind energy. So for such purpose, there are interviews carried out in the municipalities with wind parks, as well as in those where these are in the process of being installed or the project is in its due course. Simulation of wind parks installation. The Wind Park Wandered software tool is a Design and Visualisation tool developed by CINAR, which allows the preview of potential wind parks, evaluating their visual and audio impact. Production and distribution of information on wind energy. For such purpose, we can include the present publication with which one could summarise the main aspects associated with wind energy from its origin, the study of energy source (wind), and the machines that make use of it or the most relevant social and environmental contexts. Organizing informative seminars on the design possibilities of wind parks. At these seminar, one could assess the present wind energy situation in the European context and in each one of the participating countries. And possibilities of presenting WPW software as a design tool for wind parks. (Author) 12 refs.

  19. Addressing Social and Institutional Barriers for Wind Energy Installations

    International Nuclear Information System (INIS)

    Ramirez, L.; Gonzalez, R.; Varela, M.; Saez, R.; Ramirez, I.; Vicente, F.

    2000-01-01

    This project has been jointly financed by the European Commission and developed within the Programme Thermie- B. The main tasks to carried out are: Revision of institutional and legal framework. The revision of institutional and legal framework of different participating countries, i.e. their comparison with the rest of the countries with a relevant role in the field of wind energy. Opinion poli carried out on the wind energy. By means of this means, one wants to test public opinion with respect to wind energy. So for such purpose, there are interviews carried out in the municipalities with wind parks, as well as in those where these are in the process of being installed or the project is in its due course. Simulation of wind parks installation. The Wind Park Wandered software tool is a Design and Visualisation tool developed by CINAR, which allows the preview of potential wind parks, evaluating their visual and audio impact. Production and distribution of information on wind energy. For such purpose, we can include the present publication with which one could summarise the main aspects associated with wind energy from its origin, the study of energy source (wind), and the machines that make use of it or the most relevant social and environmental contexts. Organising informative seminars on the design possibilities of wind parks. At these seminars, one could assess the present wind energy situation in the European context and in each one of the participating countries. And possibilities of presenting WPW software as a design tool for wind parks. (Author) 12 refs

  20. Status and perspectives of wind turbine installations in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Barra, L; Arena, A; Mizzoni, G; Pirazzi, L [ENEA, Rome (Italy). Energy Dept.

    1996-12-31

    The article intends to illustrate the Italian situation in wind sector, giving some elements to explain why some delay is registered with respect to other European countries. Further than the present day situation, from which it can be concluded that the diffusion process is still commencing, being installed only 20 MW, the perspectives are discussed. Projects for plant installations totaling about 430 MW have been submitted to the electric utility. The actual realization of these important initiatives will probably depend on the ability to use wind energy as an occasion to sustain economic development of the involved zones. (author)

  1. Status and perspectives of wind turbine installations in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Barra, L.; Arena, A.; Mizzoni, G.; Pirazzi, L. [ENEA, Rome (Italy). Energy Dept.

    1995-12-31

    The article intends to illustrate the Italian situation in wind sector, giving some elements to explain why some delay is registered with respect to other European countries. Further than the present day situation, from which it can be concluded that the diffusion process is still commencing, being installed only 20 MW, the perspectives are discussed. Projects for plant installations totaling about 430 MW have been submitted to the electric utility. The actual realization of these important initiatives will probably depend on the ability to use wind energy as an occasion to sustain economic development of the involved zones. (author)

  2. Status and perspectives of wind turbine installations in Italy

    International Nuclear Information System (INIS)

    Barra, L.; Arena, A.; Mizzoni, G.; Pirazzi, L.

    1995-01-01

    The article intends to illustrate the Italian situation in wind sector, giving some elements to explain why some delay is registered with respect to other European countries. Further than the present day situation, from which it can be concluded that the diffusion process is still commencing, being installed only 20 MW, the perspectives are discussed. Projects for plant installations totaling about 430 MW have been submitted to the electric utility. The actual realization of these important initiatives will probably depend on the ability to use wind energy as an occasion to sustain economic development of the involved zones. (author)

  3. Challenges faced by China compared with the US in developing wind power

    Science.gov (United States)

    Lu, Xi; McElroy, Michael B.; Peng, Wei; Liu, Shiyang; Nielsen, Chris P.; Wang, Haikun

    2016-06-01

    In the 21st Conference of the Parties held in Paris in December 2015, China pledged to peak its carbon emissions and increase non-fossil energy to 20% by 2030 or earlier. Expanding renewable capacity, especially wind power, is a central strategy to achieve these climate goals. Despite greater capacity for wind installation in China compared to the US (145.1 versus 75.0 GW), less wind electricity is generated in China (186.3 versus 190.9 TWh). Here, we quantify the relative importance of the key factors accounting for the unsatisfactory performance of Chinese wind farms. Different from the results in earlier qualitative studies, we find that the difference in wind resources explains only a small fraction of the present China-US difference in wind power output (-17.9% in 2012); the curtailment of wind power, differences in turbine quality, and delayed connection to the grid are identified as the three primary factors (respectively -49.3%, -50.2%, and -50.3% in 2012). Improvements in both technology choices and the policy environment are critical in addressing these challenges.

  4. Wind-power installation on the Guetsch in Switzerland; Windkraftanlage Guetsch, EW Ursern, Andermatt UR

    Energy Technology Data Exchange (ETDEWEB)

    Russi, M.

    2006-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 800 kW wind turbine installed in 2001/2002 by the Ursern electricity utility near Andermatt, Switzerland, at a height of 2350 meters above sea level. The original prototype wind turbine contained various components from Swiss industry, such as the generator and the inverter. Because of difficulties (cracks in rotor blades, bankruptcy of the manufacturer, etc.) this installation was replaced by an Enercon 600-kW-wind turbine in 2004. Characteristic features of this turbine, such as is its adaptation for use under turbulent wind conditions at cold locations, are discussed. The results obtained in 2005 made it obvious that the utilisation of wind energy in alpine regions is possible and that the extreme conditions at this location do not significantly affect the efficient and safe operation of such an installation. Together with the presence of a meteorological station in the vicinity, optimal operating conditions prevail at this site for further research projects in connection with icing-up of turbine blades and wind energy. The report describes the installation and de-installation of the first turbine and the installation of the present one. Initial experience gained with the installation and its certification by the 'Naturemade' eco-power programme is discussed, as is future expansion at the site.

  5. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  6. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  7. The design construction and installation of the helical winding for the CLEO stellarator

    International Nuclear Information System (INIS)

    Hunt, R.R.; Bayes, D.V.

    1979-03-01

    The CLEO stellarator has a torus 900mm major radius and 166mm minor radius, fitted externally with a 7 field period, l = 3, 120kAT helical winding of 179mm mean radius. The winding and torus have to withstand the large forces produced by the interaction of the current flowing in the winding with the toroidal magnetic field of 2 tesla produced by 24 coils spaced around the torus. To allow the torus to be divided the winding has to be split requiring a total of 240 demountable current-carrying joints at the torus vacuum joint positions. The design, development, manufacture, installation and operation of the helical winding is discussed. From the early development stages to installation took four years. When completed this was the largest installation of its type in Europe. (author)

  8. Small Wind Electric Systems An Alaska Consumer's Guide

    International Nuclear Information System (INIS)

    O'Dell, K.

    2001-01-01

    The Alaska Consumer's Guide for Small Wind Electric Systems provides consumers with enough information to help them determine if a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include: how to make your home more energy efficient, how to choose the right size turbine, the parts of a wind electric system, determining if there is enough wind resource on your site, choosing the best site for your turbine, connecting your system to the utility grid, and if it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a state wind resource map and a list of state incentives and state contacts for more information

  9. Small Wind Electric Systems: A Vermont Consumer's Guide

    International Nuclear Information System (INIS)

    O'Dell, K.

    2001-01-01

    The Vermont Consumer's Guide for Small Wind Electric Systems provides consumers with enough information to help them determine if a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include: how to make your home more energy efficient, how to choose the right size turbine, the parts of a wind electric system, determining if there is enough wind resource on your site, choosing the best site for your turbine, connecting your system to the utility grid, and if it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a state wind resource map and a list of state incentives and state contacts for more information

  10. Wind around the world

    International Nuclear Information System (INIS)

    Rackstraw, K.

    1998-01-01

    A combination of cost reductions and progressive policies in key markets kept the world wind market percolating in 1997 with a record 1510 MW of new wind capacity installed, representing annual sales of more than $1.5 billion. This new record surpasses last year''s total by 24 percent, about the average annual rate of growth for the last three years. Worldwide utility-scale wind installations at the end of 1997 totaled 7763 MW. Most activity occurred in Europe, which accounted for over 75 percent of 1997 installations. Germany was again the world''s leading single market, this time by quite a large margin, accounting for more than one-third of the annual total by itself at 532 MW in 1997. The end of 1997 also marked the time at which Germany officially passed the US as the largest total single market with over 2079 MW in total installations versus about 1805 MW for the US, although the US had actually lost the lead by mid-year. Spain is the new addition to the top echelon of world wind markets, installing 215 MW in 1997 that more than doubles their total installed capacity over the previous year and ranks them number three in the world for the year. Denmark''s 1997 total of 300 MW is also a record, although this estimate could go up as the official count is finalized. India, the second largest wind market in 1995 and 1996, slipped several notches because of a variety of factors, including a change in government and a slowdown in the economy. The US wind market continues to stagnate as it has for the last several years, largely because of the uncertainty surrounding restructuring of US electric utilities. The US market is poised for a big comeback in 1998, however

  11. Small Wind Electric Systems: A Kansas Consumer's Guide

    International Nuclear Information System (INIS)

    O'Dell, K.

    2001-01-01

    The Kansas Consumer's Guide for Small Wind Electric Systems provides consumers with enough information to help them determine if a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include: how to make your home more energy efficient, how to choose the right size turbine, the parts of a wind electric system, determining if there is enough wind resource on your site, choosing the best site for your turbine, connecting your system to the utility grid, and if it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a list of state incentives and state contacts for more information

  12. Multi-megawatt wind-power installations call for new, high-performance solutions

    International Nuclear Information System (INIS)

    2004-01-01

    This article discusses the development of increasingly powerful and profitable wind-energy installations for off-shore, on-shore and refurbishment sites. In particular, the rapid development of megawatt-class units is discussed. The latest products of various companies with rotor diameters of up to 120 metres and with power ratings of up to 5 MW are looked at and commented on. The innovations needed for the reduction of weight and the extreme demands placed on gearing systems are discussed. Also, the growing markets for wind energy installations in Europe and the United States are discussed and plans for new off-shore wind parks are looked at

  13. Results, advantages, cost effectivity and installation potential of cooperation wind turbines

    International Nuclear Information System (INIS)

    Langenbach, J.; De Vries, J.

    1990-01-01

    September 1987 a cooperation of small electricity consumers installed the first cooperative wind turbine in Delft, Netherlands. At present there are 25 such cooperatives with more than 4000 members. In February 1990 14 cooperative wind turbines were in operation with a total capacity of 1,030 kWh. An extension to 23 wind turbines with a total capacity of circa 1.8 MW and a total investment of 3.8 million Dutch guilders is expected for 1990. In 1989 1.1 million kWh has been generated, and in 1990 a production of more than 2 million kWh is expected. The most important advantages of cooperative exploitation of wind turbines are the positive public opinion, extensive possibilities to install the wind turbines, the free choice of location, and cost effectivity. At the present level of investment subsidies and kWh compensations the installed capacity can increase to a maximum of 10 MW in 1995. If a national regulation for cooperative exploitation will be implemented, the kWh compensations increase to DFl 0.17-0.20 and the investment subsidies gradually decrease to zero, the total capacity can mount to 40 MW in 1995 and 125 MW in the year 2000. 1 fig., 3 tabs., 3 refs

  14. Small Wind Electric Systems: A New Mexico Consumer's Guide

    International Nuclear Information System (INIS)

    O'Dell, K.

    2001-01-01

    The New Mexico Consumer's Guide for Small Wind Electric Systems provides consumers with enough information to help them determine if a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include: how to make your home more energy efficient, how to choose the right size turbine, the parts of a wind electric system, determining if there is enough wind resource on your site, choosing the best site for your turbine, connecting your system to the utility grid, and if it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a state wind resource map and a list of state incentives and state contacts for more information

  15. Small Wind Electric Systems: A South Dakota Consumer's Guide

    International Nuclear Information System (INIS)

    O'Dell, K.

    2001-01-01

    The South Dakota Consumer's Guide for Small Wind Electric Systems provides consumers with enough information to help them determine if a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include: how to make your home more energy efficient, how to choose the right size turbine, the parts of a wind electric system, determining if there is enough wind resource on your site, choosing the best site for your turbine, connecting your system to the utility grid, and if it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a state wind resource map and a list of state incentives and state contacts for more information

  16. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  17. U.S. Wind Energy Manufacturing and Supply Chain: A Competitiveness Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Fullenkamp, Patrick H; Holody, Diane S

    2014-06-15

    The goal of the project was to develop a greater understanding of the key factors determining wind energy component manufacturing costs and pricing on a global basis in order to enhance the competitiveness of U.S. manufacturers, and to reduce installed systems cost. Multiple stakeholders including DOE, turbine OEMs, and large component manufactures will all benefit by better understanding the factors determining domestic competitiveness in the emerging offshore and next generation land-based wind industries. Major objectives of this project were to: 1. Carry out global cost and process comparisons for 5MW jacket foundations, blades, towers, and permanent magnet generators; 2. Assess U.S. manufacturers’ competitiveness and potential for cost reduction; 3. Facilitate informed decision-making on investments in U.S. manufacturing; 4. Develop an industry scorecard representing the readiness of the U.S. manufacturers’ to produce components for the next generations of wind turbines, nominally 3MW land-based and 5MW offshore; 5. Disseminate results through the GLWN Wind Supply Chain GIS Map, a free website that is the most comprehensive public database of U.S. wind energy suppliers; 6. Identify areas and develop recommendations to DOE on potential R&D areas to target for increasing domestic manufacturing competitiveness, per DOE’s Clean Energy Manufacturing Initiative (CEMI). Lists of Deliverables 1. Cost Breakdown Competitive Analyses of four product categories: tower, jacket foundation, blade, and permanent magnet (PM) generator. The cost breakdown for each component includes a complete Bill of Materials with net weights; general process steps for labor; and burden adjusted by each manufacturer for their process categories of SGA (sales general and administrative), engineering, logistics cost to a common U.S. port, and profit. 2. Value Stream Map Competitiveness Analysis: A tool that illustrates both information and material flow from the point of getting a

  18. Implications of a PTC Extension on U.S. Wind Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Steinberg, D.; Mendelsohn, M.; Zinaman, O.; James, T.; Porro, G.; Hand, M.; Mai, T.; Logan, J.; Heeter, J.; Bird, L.

    2014-04-01

    This analysis explores the potential effects of wind production tax credit expiration and various extension scenarios on future wind deployment with the Regional Energy Deployment System (ReEDS), a model of the U.S. electricity sector. The analysis does not estimate the potential implications on government tax revenue associated with the PTC. Key findings include: Under a scenario in which the PTC is not extended and all other policies remain unchanged, wind capacity additions are expected to be between 3 and 5 GW per year from 2013-2020; PTC extension options that ramp-down from the current level to zero-credit by year-end 2022 appear to be insufficient to support deployment at the recent historical average; Extending the PTC at its historical level may provide the best opportunity to support deployment consistent with recent levels across a range of potential market conditions; it therefore may also provide the best opportunity to sustain wind power installation and manufacturing sector at current levels.

  19. Simulation Based Investigation of the Impact of Information Sharing on the Offshore Wind Farm Installation Process

    Directory of Open Access Journals (Sweden)

    Moritz Quandt

    2017-01-01

    Full Text Available In the recent decades, the introduction of a sustainable and green energy infrastructure, and, by this, the reduction of emissions caused by fossil energy generation, has been focused on by industry-oriented nations worldwide. Among the technologies of renewable energy generation, wind energy has the highest deployment rate, due to the high wind resource availability and the high technology maturity reached mainly by the onshore installation of wind turbines. However, the planning and the installation of offshore wind farms are a challenging task, because of harsh weather conditions and limited resource availability. Due to the current practice of decentralised information acquisition by the supply chain partners, we investigate the impact of sharing information on the installation process of offshore wind farms by means of a simulation model. Therefore, relevant information items will be identified in order to improve the installation process.

  20. Nacelle Chine Installation Based on Wind-Tunnel Test Using Efficient Global Optimization

    Science.gov (United States)

    Kanazaki, Masahiro; Yokokawa, Yuzuru; Murayama, Mitsuhiro; Ito, Takeshi; Jeong, Shinkyu; Yamamoto, Kazuomi

    Design exploration of a nacelle chine installation was carried out. The nacelle chine improves stall performance when deploying multi-element high-lift devices. This study proposes an efficient design process using a Kriging surrogate model to determine the nacelle chine installation point in wind-tunnel tests. The design exploration was conducted in a wind-tunnel using the JAXA high-lift aircraft model at the JAXA Large-scale Low-speed Wind Tunnel. The objective was to maximize the maximum lift. The chine installation points were designed on the engine nacelle in the axial and chord-wise direction, while the geometry of the chine was fixed. In the design process, efficient global optimization (EGO) which includes Kriging model and genetic algorithm (GA) was employed. This method makes it possible both to improve the accuracy of the response surface and to explore the global optimum efficiently. Detailed observations of flowfields using the Particle Image Velocimetry method confirmed the chine effect and design results.

  1. Wind Spires as an Alternative Energy Source

    Energy Technology Data Exchange (ETDEWEB)

    Majid Rashidi, Ph.D., P.E.

    2012-10-30

    This report discloses the design and development of an innovative wind tower system having an axisymmetric wind deflecting structure with a plurality of symmetrically mounted rooftop size wind turbines near the axisymmetric structure. The purpose of the wind deflecting structure is to increase the ambient wind speed that in turn results in an overall increase in the power capacity of the wind turbines. Two working prototypes were constructed and installed in the summer of 2009 and 2012 respectively. The system installed in the Summer of 2009 has a cylindrical wind deflecting structure, while the tower installed in 2012 has a spiral-shape wind deflecting structure. Each tower has 4 turbines, each rated at 1.65 KW Name-Plate-Rating. Before fabricating the full-size prototypes, computational fluid dynamic (CFD) analyses and scaled-down table-top models were used to predict the performance of the full-scale models. The performance results obtained from the full-size prototypes validated the results obtained from the computational models and those of the scaled-down models. The second prototype (spiral configuration) showed at a wind speed of 11 miles per hour (4.9 m/s) the power output of the system could reach 1,288 watt, when a typical turbine installation, with no wind deflecting structure, could produce only 200 watt by the same turbines at the same wind speed. At a wind speed of 18 miles per hour (8 m/sec), the spiral prototype produces 6,143 watt, while the power generated by the same turbines would be 1,412 watt in the absence of a wind deflecting structure under the same wind speed. Four US patents were allowed, and are in print, as the results of this project (US 7,540,706, US 7,679,209, US 7,845,904, and US 8,002,516).

  2. Wind power installations in Switzerland - Guidelines for the analysis of environmental impact; Eoliennes en Suisse. Guide pour l'analyse des effets sur l'environnement

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) provides guidelines concerning the impact of the construction of wind-energy installations on the environment in Switzerland. The report aims to ascertain the relevant environmental aspects of the construction of such wind turbines. If no relevant restrictions apply, the acceptance of such wind power installations is said to increase. The guidelines also recommend a standardised course of action and provide sources of information for investors that are necessary for successful planning. The results which can be obtained by using these guidelines can be used to compile a short-form report for cantonal environment protection agencies. An appendix contains an example of the structure of such a report.

  3. Feasibility study of offshore wind turbine installation in Iran compared with the world

    Energy Technology Data Exchange (ETDEWEB)

    Mostafaeipour, Ali [Industrial Engineering Department, Yazd University, Yazd (Iran)

    2010-09-15

    Renewable energies have potential for supplying of relatively clean and mostly local energy. Wind energy generation is expected to increase in the near future and has experienced dramatic growth over the past decade in many countries. Offshore winds are generally stronger and more constant than onshore winds in many areas. The economic feasibility for utilization of offshore wind energy depends on the favorable wind conditions in the area. The present paper analyses offshore wind speed in global scale and also studies feasibility of introducing this technology for harnessing wind in Persian Gulf, Caspian Sea, Urmia Lake and Gulf of Oman. Wind speed data were collected from different sources. The ocean surface winds at a 10 m height from satellite passes as processed by NOAA/NESDIS, from near real-time data collected by NASA/JPL's Sea Winds Scatterometer aboard the QuikSCAT. Development of renewable energy is one of priority research goals in Iran. There are many installed wind turbines in suitable regions like Manjil and Binalood, but there has not been any offshore wind installation yet in Iran. It is suggested that policy makers to invest and pay more attentions toward harnessing renewable energy sources like offshore wind in Persian Gulf and Gulf of Oman in southern parts of Iran. (author)

  4. Protection of Basic Nuclear Installations Against External Flooding - Guide No. 13

    International Nuclear Information System (INIS)

    2013-01-01

    The French regulations require that the flooding hazard be taken into consideration in the demonstration of nuclear safety of basic nuclear installations (BNI). This guide details the recommendations concerning the external flooding hazard which is defined, for the purpose of this guide, as being a flood whose origin is external to the structures, areas or buildings of the BNI accommodating systems or components to be protected, whatever the cause(s) of that flooding (rainfall, river spates, storms, pipes failures, etc.). An external flood therefore means any flood originating outside the perimeter of the BNI and certain floods originating within the BNI perimeter. The terms 'flood' or 'flooding' as used henceforth designate external flooding. The purpose of this guide is to: - define the situations to consider when assessing the flood hazard for the site in question; - propose an acceptable method of quantifying them; - list recommendations for defining means of protection adapted to the specifics of the flooding hazard, implemented by the licensee according to the life cycle phases of the installation. The guide has taken climate change into account when the state of knowledge so allows. It is necessary to take into account - on the basis of current knowledge - the predictable climate changes for a period representative of the installations' foreseeable life times, and until the next safety review. The use of this guide necessitates prior identification - for the installation in question - of the functions required to demonstrate nuclear safety and which shall be preserved in the event of flooding. These functions are called 'safety functions' in this guide. This guide applies to all the basic nuclear installations defined by article L. L.593-2 of the Environment Code. With regard to radioactive waste disposal installations, this guide only applies to above-ground facilities. This guide can be used to assess the external flooding hazards and the associated

  5. A short history of wind power - from its early beginnings to today's installations and its business environment

    International Nuclear Information System (INIS)

    2005-01-01

    This article takes a look at how wind power has developed from its beginnings centuries ago with windmills over early installations in Denmark around 1900 through to the modern wind-parks providing many thousands of megawatts of wind power generated by 100-metre-high units with installed power ratings of up to 5 megawatts. The history of wind power is looked at from the simple windmill to the modern, industrially manufactured mass product. The expected growth of the wind-power market in the twenty-first century is discussed, as are the legal regulations governing their construction and use. Figures are also given on production capacities and installed power in various countries

  6. 2014 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R; Bolinger, M.

    2015-08-01

    According to the 2014 Wind Technologies Market Report, total installed wind power capacity in the United States grew at a rate of eight percent in 2014, bringing the United States total installed capacity to nearly 66 gigawatts (GW), which ranks second in the world and meets 4.9 percent of U.S. end-use electricity demand in an average year. In total, 4,854 MW of new wind energy capacity were installed in the United States in 2014. The 2014 Wind Technologies Market Report also finds that wind energy prices are at an all-time low and are competitive with wholesale power prices and traditional power sources across many areas of the United States. Additionally, a new trend identified by the 2014 Wind Technologies Market Report shows utility-scale turbines with larger rotors designed for lower wind speeds have been increasingly deployed across the country in 2014. The findings also suggest that the success of the U.S. wind industry has had a ripple effect on the American economy, supporting 73,000 jobs related to development, siting, manufacturing, transportation, and other industries.

  7. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  8. The Astrobiology Field Guide in World Wind

    Science.gov (United States)

    Scalice, D. M.

    2004-12-01

    In collaboration with the Australian Centre for Astrobiology (ACA), and NASA Learning Technologies (NLT), and utilizing the powerful visualization capabilities of their "World Wind" software, the NASA Astrobiology Institute (NAI) is crafting a prototype "Astrobiology Field Guide" to bring the field experiences and stories of astrobiology science to the public and classrooms around the world. The prototype focuses on one region in particular - The Pilbara in Western Australia. This first Field Guide "hotspot" is an internationally recognized area hosting the best known example of the earliest evidence of life on Earth - a stromatolitic chert precipitation in the 3.45 Ga Warrawoona Group. The goal of the Astrobiology Field Guide is to engage students of all ages with the ongoing field expeditions of today's astrobiologists as they explore the ends of the Earth searching for clues to life's origin, evolution, and distribution in the Universe. The NAI hopes to expand this Field Guide to include many more astrobiologically relevant areas across the globe such as Cuatro Cienegas in Mexico, the Rio Tinto in Spain, Yellowstone National Park in the US, and the Lost City hydrothermal vent field on the mid-Atlantic ridge - and possibly sites on Mars. To that end, we will be conducting feasibility studies and evaluations with informal and formal education contacts. The Astrobiology Field Guide is also serving as a cornerstone to educational materials being developed focused on the Pilbara region for use in classrooms in Australia, the UK, and potentially the US. These materials are being developed by the Australian Centre for Astrobiology, and the ICT Innovations Centre at Macquarie University in Sydney, in collaboration with the NAI and the Centre for Astronomy and Science Education at the University of Glamorgan in the UK.

  9. Simulation and verification of transient events in large wind power installations

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.; Hansen, A.D.; Christensen, P.; Meritz, M.; Bech, J.; Bak-Jensen, B.; Nielsen, H.

    2003-10-01

    Models for wind power installations excited by transient events have been developed and verified. A number of cases have been investigated, including comparisons of simulations of a three-phase short circuit, validation with measurements of tripping of single wind turbine, islanding of a group of two wind turbines, and voltage steps caused by tripping of wind turbines and by manual transformer tap-changing. A Benchmark model is also presented, enabling the reader to test own simulation results against results obtained with models developed in EMTDC and DIgSILENT. (au)

  10. Towards a Risk-based Decision Support for Offshore Wind Turbine Installation and Operation & Maintenance

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard; Vatne, Sigrid Ringdalen

    2016-01-01

    Costs of operation & maintenance, assembly, transport and installation of offshore wind turbines contribute significantly to the total cost of offshore wind farm. These operations are mostly carried out by specific ships that have to be hired for the operational phase and for duration of installa......Costs of operation & maintenance, assembly, transport and installation of offshore wind turbines contribute significantly to the total cost of offshore wind farm. These operations are mostly carried out by specific ships that have to be hired for the operational phase and for duration...... of installation process, respectively. Duration, and therefore ship hiring costs is, among others, driven by waiting time for weather windows for weather-sensitive operations. Today, state of the art decision making criteria for weather-sensitive operations are restrictions to the significant wave height...... and the average wind velocity at reference height. However, actual limitations are physical, related to response of equipment used e.g. crane wire tension, rotor assembly motions while lifting, etc. Transition from weather condition limits to limits on physical equipment response in decision making would improve...

  11. Wind energy potential assessment of Cameroon's coastal regions for the installation of an onshore wind farm.

    Science.gov (United States)

    Arreyndip, Nkongho Ayuketang; Joseph, Ebobenow; David, Afungchui

    2016-11-01

    For the future installation of a wind farm in Cameroon, the wind energy potentials of three of Cameroon's coastal cities (Kribi, Douala and Limbe) are assessed using NASA average monthly wind data for 31 years (1983-2013) and compared through Weibull statistics. The Weibull parameters are estimated by the method of maximum likelihood, the mean power densities, the maximum energy carrying wind speeds and the most probable wind speeds are also calculated and compared over these three cities. Finally, the cumulative wind speed distributions over the wet and dry seasons are also analyzed. The results show that the shape and scale parameters for Kribi, Douala and Limbe are 2.9 and 2.8, 3.9 and 1.8 and 3.08 and 2.58, respectively. The mean power densities through Weibull analysis for Kribi, Douala and Limbe are 33.7 W/m2, 8.0 W/m2 and 25.42 W/m2, respectively. Kribi's most probable wind speed and maximum energy carrying wind speed was found to be 2.42 m/s and 3.35 m/s, 2.27 m/s and 3.03 m/s for Limbe and 1.67 m/s and 2.0 m/s for Douala, respectively. Analysis of the wind speed and hence power distribution over the wet and dry seasons shows that in the wet season, August is the windiest month for Douala and Limbe while September is the windiest month for Kribi while in the dry season, March is the windiest month for Douala and Limbe while February is the windiest month for Kribi. In terms of mean power density, most probable wind speed and wind speed carrying maximum energy, Kribi shows to be the best site for the installation of a wind farm. Generally, the wind speeds at all three locations seem quite low, average wind speeds of all the three studied locations fall below 4.0m/s which is far below the cut-in wind speed of many modern wind turbines. However we recommend the use of low cut-in speed wind turbines like the Savonius for stand alone low energy needs.

  12. Assessment approaches to logistics for offshore wind energy installation

    NARCIS (Netherlands)

    Vis, Iris F.A.; Ursavas, Evrim

    2016-01-01

    Offshore wind farm installation planning is highly complex, due to the high dependency on weather and the oversized components that impose specific constraints in areas such as transportation and lifting. Currently, there is very little transparency vis-à-vis the logistics challenges in the

  13. Solar Energy Installers Curriculum Guides. Final Report.

    Science.gov (United States)

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  14. Stochastic Evaluation of Maximum Wind Installation in a Radial Distribution Network

    DEFF Research Database (Denmark)

    Chen, Peiyuan; Bak-Jensen, Birgitte; Chen, Zhe

    2011-01-01

    This paper proposes an optimization algorithm to find the maximum wind installation in a radial distribution network. The algorithm imposes a limit on the amount of wind energy that can be curtailed annually. The algorithm implements the wind turbine reactive power control and wind energy...... curtailment using sensitivity factors. The optimization is integrated with Monte Carlo simulation to account for the stochastic behavior of load demand and wind power generation. The proposed algorithm is tested on a real 20 kV Danish distribution system in Støvring. It is demonstrated that the algorithm...... executes reactive compensation and energy curtailment sequentially in an effective and efficient manner....

  15. In the wind of change. The wind power as pacesetters and guide to a fast turn to renewable energies; Im Wind des Wandels. Die Windkraft als Schrittmacher und Wegweiser zu einer schnellen Wende zu Erneuerbaren Energien

    Energy Technology Data Exchange (ETDEWEB)

    Scheer, H.; Alt, F.

    2007-07-01

    All renewable energy potentials (water power, bioenergy, wave power, geothermal energy) clearly are widespread as oil, natural gas, coal or uranium. For these potentials there are natural, spatial restrictions. In contrast to this, there exist any spatial restrictions for solar power and wind force. Under this aspect, the author of the contribution under consideration reports on wind force as a pacesetter and guide to a fast turn to renewable energy. Solar energy and wind energy have two crucial advantages of realizations: (a) The solar power plants and wind power plants can be installed faster than all other plants for generation of electrical power; (b) Solar power plants and wind power plants enable a radical shortening and simplification for the power supply. The generation and supply of electricity from solar power and wind power are also economically undefeatable. It is not a utopia to increase the contribution of the wind energy at the German power generation on basis of the renewable energy law in few years on over 40 %. The thesis, a further development of the wind power only is possible with offshore installations, because no suitable locations are present in the inland, is not correct. The emphasis of the use of wind power must remain with onshore plants. A broad dispersion of wind power plants should have priority, because the grid entrance is more easily realizable. The political attention must be directed toward the overcoming of the permission obstacles. Wind energy enables the passing of electricity from the shade of atomic and fossil power supply.

  16. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  17. Small Wind Electric Systems: A Virginia Consumer's Guide

    Energy Technology Data Exchange (ETDEWEB)

    2003-06-01

    The purpose of the Small Wind Electric Systems Consumer's: A Virginia Consumer's Guide is to provide consumers with enough information to help them determine if a small wind electric system will work for them based on their wind resource, the type and size of their sites, and their economics. The cover of this guide contains a Virginia wind resource map and information about state incentives and contacts for more information.

  18. Project appraisal for small and medium size wind energy installation: The Italian wind energy policy effects

    International Nuclear Information System (INIS)

    Fera, M.; Iannone, R.; Macchiaroli, R.; Miranda, S.; Schiraldi, M.M.

    2014-01-01

    In the last few years, the distributed energy production from small wind turbines (i.e.<200 kWp) has developed into a relevant business opportunity for different investors in Italy. The market, especially in Italy, has rapidly grown, achieving 9 MWp only in 2011, with an increase from 1.5 MW in 2009 to 13.3 MW at the end of 2011. This paper reports the results of a case study on the installation of several small wind turbines. It aims to provide an analysis of the conditions in Italy that make it possible to install these machines and offer a reliable reference for designing, planning, and controlling small wind turbine projects while focusing on the strategic variables of time, cost, and quality used by typical enterprises in the investment projects. The results are relevant to investors as well as engineering, procurement, and construction companies involved in this new sector, which must understand Italy’s renewable energy policy and its effects in practice. Moreover, certain national energy policy conclusions are reported and discussed in this paper. To properly study the sector, the data on time, cost and quality are analysed using typical project management tools. - Highlights: • Focus on the Italian wind energy sector. • Analysis of Italian policy effects. • Focus on small/medium size wind energy machines

  19. Resource Sharing in the Logistics of the Offshore Wind Farm Installation Process based on a Simulation Study

    Directory of Open Access Journals (Sweden)

    Thies Beinke

    2017-06-01

    Full Text Available This present contribution examines by means of a discrete event and agent-based simulation the potential of a joint use of resources in the installation phase of offshore wind energy. To this end, wind farm projects to be installed simultaneously are being examined, the impact of weather restrictions on the processes of loading, transport and installation are also taken into consideration, and both the wind farm specific resource allocation and the approach of a resource pool or resource sharing, respectively, are being implemented. This study is motivated by the large number of wind farms that will be installed in the future and by the potential savings that might be realized through resource sharing. While, so far, the main driver of the resource sharing approach has been the end consumer market, it has been applied in more and more areas, even in relatively conservative industries such as logistics. After the presentation of the backgrounds and of the underlying methodology, and the description of the prior art in this context, the network of the offshore wind energy installation phase will be described. This is the basis for the subsequent determination of the savings potential of a shared resource utilization, which is determined by the performance indicators such as the total installation time and degree of utilization of the resources. The results of the simulation show that weather restrictions have a significant effect on the installation times and the usage times of the resources as well as on their degree of utilization. In addition, the resource sharing approach, has been identified to have significant savings potential for the offshore wind energy installation.

  20. The experimental study on the wind turbine’s guide-vanes and diffuser of an exhaust air energy recovery system integrated with the cooling tower

    International Nuclear Information System (INIS)

    Chong, W.T.; Hew, W.P.; Yip, S.Y.; Fazlizan, A.; Poh, S.C.; Tan, C.J.; Ong, H.C.

    2014-01-01

    Highlights: • On-site exhaust air energy recovery turbine generator mounted above cooling tower. • Energy from wasted wind resources is re-used for electricity generation. • Optimum angle arrangement of guide-vanes and diffusers help to improve wind-flow. • Enclosure solves conventional wind turbine problems. • 13.3% reduction in CO 2 emission is expected to be achieved from this system. - Abstract: An assembly of two vertical axis wind turbines (VAWTs) and an enclosure is installed above a cooling tower to harness the discharged wind for electricity generation. The enclosure consists of guide-vanes and diffuser-plates, is used to enhance the rotational speed of the turbines for power augmentation. The angle of the guide-vanes is optimized to ensure the oncoming wind stream impinges the rotor blades of the turbine at an optimum angle. The diffuser-plates are tilted at an optimum angle to increase the discharged airflow rate. The performance of the system is tested in the laboratory followed by a field test on an actual size cooling tower. The VAWT performance is increased in the range of 7–8% with the integration of enclosure. There is no significant difference in the current consumption of the fan motor between the bare cooling tower and the one with installed VAWTs. With the presence of this system, approximately 17.5 GW h/year is expected to be recovered from 3000 units of cooling towers at commercial areas, assuming the cooling tower is driven by a 7.5 kW fan motor and operates 16 h/day. This amount of recovered energy can also be translated into 13% reduction in CO 2 emission

  1. Wind energy potential assessment of Cameroon’s coastal regions for the installation of an onshore wind farm

    Directory of Open Access Journals (Sweden)

    Nkongho Ayuketang Arreyndip

    2016-11-01

    Full Text Available For the future installation of a wind farm in Cameroon, the wind energy potentials of three of Cameroon’s coastal cities (Kribi, Douala and Limbe are assessed using NASA average monthly wind data for 31 years (1983–2013 and compared through Weibull statistics. The Weibull parameters are estimated by the method of maximum likelihood, the mean power densities, the maximum energy carrying wind speeds and the most probable wind speeds are also calculated and compared over these three cities. Finally, the cumulative wind speed distributions over the wet and dry seasons are also analyzed. The results show that the shape and scale parameters for Kribi, Douala and Limbe are 2.9 and 2.8, 3.9 and 1.8 and 3.08 and 2.58, respectively. The mean power densities through Weibull analysis for Kribi, Douala and Limbe are 33.7 W/m2, 8.0 W/m2 and 25.42 W/m2, respectively. Kribi’s most probable wind speed and maximum energy carrying wind speed was found to be 2.42 m/s and 3.35 m/s, 2.27 m/s and 3.03 m/s for Limbe and 1.67 m/s and 2.0 m/s for Douala, respectively. Analysis of the wind speed and hence power distribution over the wet and dry seasons shows that in the wet season, August is the windiest month for Douala and Limbe while September is the windiest month for Kribi while in the dry season, March is the windiest month for Douala and Limbe while February is the windiest month for Kribi. In terms of mean power density, most probable wind speed and wind speed carrying maximum energy, Kribi shows to be the best site for the installation of a wind farm. Generally, the wind speeds at all three locations seem quite low, average wind speeds of all the three studied locations fall below 4.0m/s which is far below the cut-in wind speed of many modern wind turbines. However we recommend the use of low cut-in speed wind turbines like the Savonius for stand alone low energy needs

  2. Monitoring and evaluation of Blyth Offshore Wind Farm. Installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, L.

    2001-07-01

    The principle aim of this report is to appraise the practical aspects of installation and commissioning of the offshore wind farm. The construction and installation activities of the project were monitored and reviewed by the project team to enable recommendations for future larger projects to be made. This report particularly looks at how the project progressed against the construction and installation schedule with regard to weather conditions and operational procedures. The document not only describes the methods of installation, assembly and cable laying, but also reviews the effectiveness of those methods including any difficulties that were encountered and the solutions that were found. (author)

  3. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  4. 75 FR 29365 - Job Corps: Final Finding of No Significant Impact (FONSI) for Small Wind Turbine Installation at...

    Science.gov (United States)

    2010-05-25

    ... (FONSI) for Small Wind Turbine Installation at the Pine Ridge Job Corps Center Located at 15710 Highway... Finding of No Significant Impact (FONSI) for Small Wind Turbine Installation at the Pine Ridge Job Corps....11(d), gives final notice of the proposed construction of a small wind turbine at the Pine Ridge Job...

  5. US Department of Energy wind turbine candidate site program: the regulatory process

    Energy Technology Data Exchange (ETDEWEB)

    Greene, M.R.; York, K.R.

    1982-06-01

    Sites selected in 1979 as tentative sites for installation of a demonstration MOD-2 turbine are emphasized. Selection as a candidate site in this program meant that the US Department of Energy (DOE) designated the site as eligible for a DOE-purchased and installed meteorological tower. The regulatory procedures involved in the siting and installation of these meteorological towers at the majority of the candidate sites are examined. An attempt is also made, in a preliminary fashion, to identify the legal and regulatory procedures that would be required to put up a turbine at each of these candidate sites. The information provided on each of these sites comes primarily from utility representatives, supplemented by conversations with state and local officials. The major findings are summarized on the following: federal requirements, state requirements, local requirements, land ownership, wind rights, and public attitudes.

  6. Small Wind Electric Systems: A North Carolina Consumer's Guide

    Energy Technology Data Exchange (ETDEWEB)

    2005-03-01

    Small Wind Electric Systems: A North Carolina Consumer's Guide provides consumers with information to help them determine whether a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include how to make a home more energy efficient, how to choose the correct turbine size, the parts of a wind electric system, how to determine whether enough wind resource exists, how to choose the best site for a turbine, how to connect a system to the utility grid, and whether it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a list of contacts for more information.

  7. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  8. Seismic Hazards in Site Evaluation for Nuclear Installations. Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-08-15

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear installations. It supplements the Safety Requirements publication on Site Evaluation for Nuclear Installations. The present publication provides guidance and recommends procedures for the evaluation of seismic hazards for nuclear power plants and other nuclear installations. It supersedes Evaluation of Seismic Hazards for Nuclear Power Plants, IAEA Safety Standards Series No. NS-G-3.3 (2002). In this publication, the following was taken into account: the need for seismic hazard curves and ground motion spectra for the probabilistic safety assessment of external events for new and existing nuclear installations; feedback of information from IAEA reviews of seismic safety studies for nuclear installations performed over the previous decade; collective knowledge gained from recent significant earthquakes; and new approaches in methods of analysis, particularly in the areas of probabilistic seismic hazard analysis and strong motion simulation. In the evaluation of a site for a nuclear installation, engineering solutions will generally be available to mitigate, by means of certain design features, the potential vibratory effects of earthquakes. However, such solutions cannot always be demonstrated to be adequate for mitigating the effects of phenomena of significant permanent ground displacement such as surface faulting, subsidence, ground collapse or fault creep. The objective of this Safety Guide is to provide recommendations and guidance on evaluating seismic hazards at a nuclear installation site and, in particular, on how to determine: (a) the vibratory ground motion hazards, in order to establish the design basis ground motions and other relevant parameters for both new and existing nuclear installations; and (b) the potential for fault displacement and the rate of fault displacement that could affect the feasibility of the site or the safe operation of the installation at

  9. Study on the installation of the evacuation guide signs in a nuclear power plant

    International Nuclear Information System (INIS)

    Matsui, Yuko; Hamasaki, Kenichi; Ohuchi, Hiroko; Akagi, Shigefumi;; Sato, Takeyoshi

    2005-01-01

    In order to study the desirable sign system that leads people to the proper evacuation behavior in the nuclear plant, an experiment was conducted by using 3D simulation of a part of the nuclear buildings. As the condition of the experiment, 3 different simulations on the type of guide signs and the height of installation were provided. Participants in the experiment were asked: to reach the emergency exit as quickly as possible in case of the imaginary fire, to report the signs utilized for finding the way during his evacuation, and to evaluate their comprehensibility to evaluate synthetically each installation and guide sings from the view point of comprehensibility. Synthetic evaluation was highly rated when we indicated the signs on the face of the floor additionally and installed the guide signs at a height of 1000mm above the floor. For the individual guide sign, it tended to evaluate mostly comprehensible that the pathway guide sign was installed at 1,000mm above the floor, though it did not reach a statistical significant level. Furthermore, the necessity was suggested to take into consideration on the spatial relationship between a moving person and the guide signs. (author)

  10. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage

  11. Characteristics of Wind Power Projects in Mountainous Area and Techniques for Wind Turbine Installation%山区风电工程特点与风机吊装技术

    Institute of Scientific and Technical Information of China (English)

    张栋

    2014-01-01

    In recent years , mountains for domestic wind power development become higher , which also make the instal-lation of wind turbines a more difficult work .For wind power projects , it is now a major issue to complete the installation of wind turbines safely and efficiently on schedule .In this paper , practical experience from the second stage Luotuogou project in Hebei province is summarized .Characteristics of wind power projects in mountainous area and techniques for wind turbine installation are analyzed , which provide useful references to other wind turbine installation work in moun-tainous area .%近年来国内山区风电工程中山越来越高,风机安装难度越来越大,如何在紧张的工期下安全高效的完成风机安装,是每个风电施工企业面临的主要课题。以河北坝上骆驼沟二期风电场为例,对山区风电工程特点和风机吊装技术进行总结分析,以期对更多山区风机安装提供借鉴。

  12. 2010 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Ryan Wiser, Mark Bolinger

    2011-06-01

    This report provides a comprehensive overview of trends in the U.S. wind power market in 2010. The report analyzes trends in wind power capacity, industry, manufacturing, turbines, installed project costs, project performance, and wind power prices. It also describes trends among wind power developers, project owners, and power purchasers, and discusses financing issues.

  13. Extent and types of small-scale wind policies in the U.S. states: Adoption and effectiveness

    International Nuclear Information System (INIS)

    Wiener, Joshua G.; Koontz, Tomas M.

    2012-01-01

    Renewable energy sources, including wind, are increasingly promoted by U.S. state governments. Using state-level data and survey responses from energy officials in 44 states, this study catalogs the extent and types of small wind policies adopted by states. It examines the factors correlated with policy adoption, and perceptions about which policy tools are most effective. Results indicate that 84% of the states participating in the survey have adopted at least one policy to promote small wind technologies, and most have adopted several policies. The most frequent policy is net metering, and this policy tool was also perceived to be one of the most effective at encouraging businesses and consumers to install small wind technologies. However, several other policy tools perceived to be most effective at promoting small wind installations have been adopted by relatively few states. This identified gap suggests opportunities for improving policy effectiveness. In explaining factors associated with adoption of policy tools, we find support for variables comprising both the policy diffusion and internal determinants models of policy adoption, including state commitment to environmental protection and policy innovations, citizen ideology, per capita wealth, energy policy network communications, and desire to be viewed as an environmental leader.

  14. 2011 Cost of Wind Energy Review

    Energy Technology Data Exchange (ETDEWEB)

    Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

    2013-03-01

    This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

  15. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  16. A comparison study of offshore wind support structures with monopiles and jackets for U.S. waters

    Science.gov (United States)

    Damiani, R.; Dykes, K.; Scott, G.

    2016-09-01

    U.S. experience in offshore wind is limited, and high costs are expected unless innovations are introduced in one or multiple aspects of the project, from the installed technology to the balance of system (BOS). The substructure is the main single component responsible for the BOS capital expenditure (CapEx) and thus one that, if improved, could yield significant levelized cost of energy (LCOE) savings. For projects in U.S. waters, multimember lattice structures (also known as jackets) can render required stiffness for transitional water depths at potentially lower costs than monopiles (MPs). In this study, we used a systems engineering approach to evaluate the LCOE of prototypical wind power plants at six locations along the eastern seaboard and the Gulf of Mexico for both types of support structures. Using a reference wind turbine and actual metocean conditions for the selected sites, we calculated loads for a parked and an operational situation, and we optimized the MP- and jacket-based support structures to minimize their overall mass. Using a suite of cost models, we then computed their associated LCOE. For all water depths, the MP-based configurations were heavier than their jacket counterparts, but the overall costs for the MPs were less than they were for jackets up to depths of slightly less than 30m. When the associated manufacturing and installation costs were included, jackets resulted in lower LCOE for depths greater than 40m. These results can be used by U.S. stakeholders to understand the potential for different technologies at different sites, but the methodology illustrated in this study can be further employed to analyze the effects of innovations and design choices throughout wind power plant systems.

  17. A Straight-bladed Vertical Axis Wind Turbine with a Directed Guide Vane Row-Effect of Guide Vane Geometry on the Performance-

    Institute of Scientific and Technical Information of China (English)

    Manabu TAKAO; Hideki KUMA; Takao MAEDA; Yasunari KAMADA; Michiaki OKI; Atsushi MINODA

    2009-01-01

    The objective of this study is to show the effect of guide vane geometry on the performance. In order to over-come the disadvantages of vertical axis wind turbine, a straight-bladed vertical axis wind turbine (S-VAWT) with a directed guide vane row has been proposed and tested by the authors. According to previous studies, it was clarified that the performance of the turbine can be improved by means of the directed guide vane row. However, the guide vane geometry of S-VAWT has not been optimized so far. In order to clarify the effect of guide vane geometry, the effects of setting angle and gap between rotor blade and guide vane on power coefficient and start-ing characteristic were investigated in the experiments. The experimental study of the proposed wind turbine was carded out by a wind tunnel. The wind tunnel with a diameter of 1.8m is open jet type. The wind velocity is 8 m/s in the experiments. The rotor has three straight blades with a profile of NACA0018 and a chord length of 100 mm, a diameter of 0.6 m and a blade height of 0.7 m. The guide vane row consists of 3 arc plates.

  18. Wind power today

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This publication highlights initiatives of the US DOE`s Wind Energy Program. 1997 yearly activities are also very briefly summarized. The first article describes a 6-megawatt wind power plant installed in Vermont. Another article summarizes technical advances in wind turbine technology, and describes next-generation utility and small wind turbines in the planning stages. A village power project in Alaska using three 50-kilowatt turbines is described. Very brief summaries of the Federal Wind Energy Program and the National Wind Technology Center are also included in the publication.

  19. Wind power: a guide for farms and rural businesses

    International Nuclear Information System (INIS)

    1998-03-01

    This Guide is mainly concerned with single wind turbines rather than large windfarms, concentrating on the opportunities for existing businesses and new partnerships to gain value from their own local wind resource. There is a wide range of types of business that can use windpower and there are many types of application. Heavy power users are good candidates, and these include intensive livestock farms, feed mills, distilleries, vegetable cold stores, food and fish processing factories, quarries, tourist and leisure complexes, and so on. There are also many cases where using wind power is the least expensive of a number of costly options, for example where the grid is inaccessible; wind power can be used to supply heat and to pump water. The aim of this Guide is to illustrate and explain these uses, and to place them firmly in the context of business opportunity for rural areas. (author)

  20. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Windkraftanlagen in der Schweiz. Checkliste fuer Investoren von Grossanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  1. MCSA Windows Server 2012 R2 installation and configuration study guide exam 70-410

    CERN Document Server

    Panek, William

    2015-01-01

    Master Windows Server installation and configuration withhands-on practice and interactive study aids for the MCSA: WindowsServer 2012 R2 exam 70-410 MCSA: Windows Server 2012 R2 Installation and ConfigurationStudy Guide: Exam 70-410 provides complete preparationfor exam 70-410: Installing and Configuring Windows Server 2012 R2.With comprehensive coverage of all exam topics and plenty ofhands-on practice, this self-paced guide is the ideal resource forthose preparing for the MCSA on Windows Server 2012 R2. Real-worldscenarios demonstrate how the lessons are applied in everydaysettings. Reader

  2. International wind farm markets: An overview

    Energy Technology Data Exchange (ETDEWEB)

    Rackstraw, K. [American Wind Energy Association, Washington, DC (United States)

    1996-12-31

    More wind energy capacity was installed in 1995 than in any previous year. Two markets, Germany and India, accounted for nearly two-thirds of those installations, while the largest single market in the world historically, the US, ground nearly to a halt. Market supports in Germany and India, however, are vulnerable to political forces largely beyond the control of the wind industry. This paper examines the growth of international wind farm markets worldwide and notes that future markets will be more broadly based, leaving the industry less vulnerable to political changes. The paper also concludes that an additional 18,500 MW could be installed by the year 2005 even without assuming a dire ecological scenario that would create environmental drivers to accelerate wind market growth. 4 figs.

  3. A data mining approach: Analyzing wind speed and insolation period data in Turkey for installations of wind and solar power plants

    International Nuclear Information System (INIS)

    Colak, Ilhami; Sagiroglu, Seref; Demirtas, Mehmet; Yesilbudak, Mehmet

    2013-01-01

    Highlights: ► Wind speed and insolation period data were analyzed using a data mining approach. ► Most of the studies in the literature were based on Weibull and Rayleigh models. ► Nearest and farest neighbor algorithms were used with different distance metrics. ► Many inferences were achieved in efficient limits for wind and solar farm analyses. - Abstract: Wind and solar power plant installations have been recently increased rapidly with respect to the depletion of fossil-based fuels all over the world. Due to stochastic nature of meteorological conditions, wind and solar energies have a non-schedulable nature and they require several installation analyses to determine the location and the capacities of wind and solar power to be produced. This paper focuses on the similarity, feasibility and numerical analyses of 75 cities in Turkey based on the monthly average wind speed and insolation period data. The nearest and the farest neighbor algorithms are used as agglomerative hierarchical clustering methods with Euclidean, Manhattan and Minkowski distance metrics in the stage of making the similarity and feasibility analyses. The maximum cophenetic correlation coefficient is achieved by the nearest neighbor algorithm with the Minkowski distance metric in the similarity and feasibility analyses. On the other hand, graphical representations of the monthly average wind speed and insolation period data are utilized for making the numerical analysis. The highest annual average wind speed and insolation period are obtained as 3.88 m/s and 8.45 h/day, respectively. Overall, many inferences were achieved in acceptable and efficient limits for wind and solar energy.

  4. Power Performance Test Report for the U.S. Department of Energy 1.5-Megawatt Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza, Ismael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hur, Jerry [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Thao, Syhoune [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Curtis, Amy [Windward Engineering, Santa Barbara, CA (United States)

    2015-08-11

    The U.S. Department of Energy (DOE) acquired and installed a 1.5-megawatt (MW) wind turbine at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL). This turbine (hereafter referred to as the DOE 1.5) is envisioned to become an integral part of the research initiatives for the DOE Wind Program, such as Atmosphere to Electrons (A2e). A2e is a multiyear DOE research initiative targeting significant reductions in the cost of wind energy through an improved understanding of the complex physics governing wind flow into and through wind farms. For more information, visit http://energy.gov/eere/wind/atmosphere-electrons. To validate new and existing high-fidelity simulations, A2e must deploy several experimental measurement campaigns across different scales. Proposed experiments include wind tunnel tests, scaled field tests, and large field measurement campaigns at operating wind plants. Data of interest includes long-term atmospheric data sets, wind plant inflow, intra-wind plant flows (e.g., wakes), and rotor loads measurements. It is expected that new, high-fidelity instrumentation will be required to successfully collect data at the resolutions required to validate the high-fidelity simulations.

  5. Power Quality Test Report for the U.S. Department of Energy 1.5-Megawatt Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza, Ismael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hur, Jerry [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Thao, Syhoune [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-08-20

    The U.S. Department of Energy (DOE) acquired and installed a 1.5-megawatt (MW) wind turbine at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory. This turbine (hereafter referred to as the DOE 1.5) is envisioned to become an integral part of the research initiatives for the DOE Wind Program, such as Atmosphere to Electrons (A2e). A2e is a multiyear DOE research initiative targeting significant reductions in the cost of wind energy through an improved understanding of the complex physics governing wind flow into and through wind farms. For more information, visit http://energy.gov/eere/wind/atmosphere-electrons. To validate new and existing high-fidelity simulations, A2e must deploy several experimental measurement campaigns across different scales. Proposed experiments include wind tunnel tests, scaled field tests, and large field measurement campaigns at operating wind plants. Data of interest includes long-term atmospheric data sets, wind plant inflow, intra-wind plant flows (e.g., wakes), and rotor loads measurements. It is expected that new, high-fidelity instrumentation will be required to successfully collect data at the resolutions required to validate the high-fidelity simulations.

  6. Wind energy activities at UNIANDES, Colombia

    International Nuclear Information System (INIS)

    Pinilla, A.

    1991-01-01

    In Colombia, a cooperation has been established between the Universidad de Los Andes and local manufacturers. It shows that the interaction between a local R ampersand D institution and local manufacturers can stimulate the introduction of small wind pumps. Wind energy activities at the University started in 1973, which resulted in the first product in 1976. Two wind pumps have been developed. One is the Jober (D=2.5 m, H<25m, 900 US$, 600 when installed), the other is the Gaviotas (D=2m, H<15m, 450 US$) wind pump. A lot of good, low cost measuring equipment has been developed at the University, a.o. an electro-magnetic flow meter, which costs only 200 US$ (commercially available products cost 3,000 US$). Good experiences have been obtained in research under field conditions, with participation of the end-users. Gaviotas has a remarkable marketing strategy: during the wet season some 40 to 60 wind pumps are manufactured. In the dry season each installed Gaviotas wind pump is visited for maintenance. These maintenance visits are combined with promotion: potential users in the neighbourhood are taken to the wind pumps for demonstration. Regarding future activities, a proposal for a joint program with the Technical University in Eindhoven (Netherlands) and the Reading University in the United Kingdom has been approved. 6 figs., 4 ills., 5 refs

  7. A Comparison Study of Offshore Wind Support Structures with Monopiles and Jackets for U.S. Waters: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Damiani, Rick; Dykes, Katherine; Scott, George

    2016-08-01

    U.S. experience in offshore wind is limited, and high costs are expected unless innovations are introduced in one or multiple aspects of the project, from the installed technology to the balance of system (BOS). The substructure is the main single component responsible for the BOS capital expenditure (CapEx) and thus one that, if improved, could yield significant levelized cost of energy (LCOE) savings. For projects in U.S. waters, multimember, lattice structures (also known as jackets) can render required stiffness for transitional water depths at potentially lower costs than monopiles (MPs). In this study, we used a systems engineering approach to evaluate the LCOE of prototypical wind power plants at six locations along the eastern seaboard and the Gulf of Mexico for both types of support structures. Using a reference wind turbine and actual metocean conditions for the selected sites, we calculated loads for a parked and an operational situation, and we optimized the MP- and jacket-based support structures to minimize their overall mass. Using a suite of cost models, we then computed their associated LCOE. For all water depths, the MP-based configurations were heavier than their jacket counterparts, but the overall costs for the MPs were less than they were for jackets up to depths of slightly less than 30 m. When the associated manufacturing and installation costs were included, jackets resulted in lower LCOE for depths greater than 40 m. These results can be used by U.S. stakeholders to understand the potential for different technologies at different sites, but the methodology illustrated in this study can be further employed to analyze the effects of innovations and design choices throughout wind power plant systems.

  8. Wind resource assessment and wind energy system cost analysis: Fort Huachuca, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, T.L. [Tim Olsen Consulting, Denver, CO (United States); McKenna, E. [National Renewable Energy Lab., Golden, CO (United States)

    1997-12-01

    The objective of this joint DOE and National Renewable Energy Laboratory (NREL) Strategic Environmental Research and Development Program (SERDP) project is to determine whether wind turbines can reduce costs by providing power to US military facilities in high wind areas. In support of this objective, one year of data on the wind resources at several Fort Huachuca sites was collected. The wind resource data were analyzed and used as input to an economic study for a wind energy installation at Fort Huachuca. The results of this wind energy feasibility study are presented in the report.

  9. Wind power installations in Switzerland - Regional planning basics and impact; Windkraftanlagen in der Schweiz - Raumplanerische Grundlagen und Auswirkungen - Grundlagenbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  10. Harnessing wind power with sustained policy support

    Energy Technology Data Exchange (ETDEWEB)

    Meera, L. [BITS-Pilani. Dept. of Economics, Hyderabad (India)

    2012-07-01

    The development of wind power in India began in the 1990s, and has significantly increased in the last few years. The ''Indian Wind Turbine Manufacturers Association (IWTMA)'' has played a leading role in promoting wind energy in India. Although a relative newcomer to the wind industry compared with Denmark or the US, a combination of domestic policy support for wind power and the rise of Suzlon (a leading global wind turbine manufacturer) have led India to become the country with the fifth largest installed wind power capacity in the world. Wind power accounts for 6% of India's total installed power capacity, and it generates 1.6% of the country's power. (Author)

  11. Designed for extreme weather conditions. Installation ship for wind power plants; Fuer extreme Wetterlagen ausgelegt. Installationsschiff fuer Windenergieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Wedel, Henning von [Waertsilae Deutschland GmbH, Hamburg (Germany)

    2012-02-13

    In recent years, Waertsilaehas gained a leadership position of special ships for the installation of wind turbines. The high-performance turbine installation ship Seawolf (HPTIV) is the latest in this series.

  12. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  13. Ground mounted photovoltaic installations. Guide for an impact study

    International Nuclear Information System (INIS)

    2011-01-01

    Legally, an impact study must be performed for ground mounted photovoltaic installations with a power greater than 250 kW. This guide is aimed at helping the actors of the photovoltaic sector to perform impact studies. After the description of the characteristics of a photovoltaic installation (principles, technical characteristics of a ground mounted installation, impact of photovoltaic systems on climate) and a presentation of the legal framework (European commitments, Grenelle de l'Environnement, applicable procedures), this report present the objectives and approach of an impact study, describes how the environment is taken into account from the early stages of a project, how the impact study is to be prepared. The last part describes the different components of the impact study: legal content, project description, analysis of the site initial status and environment, analysis of the project effects, rationale for the choice of the project

  14. Guide for: environmental radiological surveillance at US Department of Energy installations

    International Nuclear Information System (INIS)

    Corley, J.P.; Denham, D.H.; Jaquish, R.E.; Michels, D.E.; Olsen, A.R.; Waite, D.A.

    1981-07-01

    This second edition of the Guide, originally published in 1977, is presented as an interim revision and does not contain major changes in content. The original objectives and scope of the Guide have not changed. The Guide is intended to: provide recommended methods, procedures, and performance criteria to bring greater comparability to DOE environmental monitoring and reporting systems; provide DOE management, particularly the Headquarters' Operational and Environmental Safety Division (OESD) and field offices, with a broad review of accepted radiological surveillance practices for use in the evaluation of environmental surveillance programs at DOE facilities; and delineate the capabilities and limitations of the various environmental monitoring systems for radioactivity currently used at DOE sites, including technical areas where there is either an inadequate basis for procedural selection or where further development work may be warranted. The document is intended as a guide, not a manual of detailed mandatory procedure

  15. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    Energy Technology Data Exchange (ETDEWEB)

    Maples, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); van de Pietermen, R. [Energy Research Center of the Netherlands (Netherlands); Obdam, T. [Energy Research Center of the Netherlands (Netherlands)

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  16. Acoustic Noise Test Report for the U.S. Department of Energy 1.5-Megawatt Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Roadman, Jason [National Renewable Energy Lab. (NREL), Golden, CO (United States); Huskey, Arlinda [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-07-01

    A series of tests were conducted to characterize the baseline properties and performance of the U.S. Department of Energy (DOE) 1.5-megawatt wind turbine (DOE 1.5) to enable research model development and quantify the effects of future turbine research modifications. The DOE 1.5 is built on the platform of GE's 1.5-MW SLE commercial wind turbine model. It was installed in a nonstandard configuration at the NWTC with the objective of supporting DOE Wind Program research initiatives such as A2e. Therefore, the test results may not represent the performance capabilities of other GE 1.5-MW SLE turbines. The acoustic noise test documented in this report is one of a series of tests carried out to establish a performance baseline for the DOE 1.5 in the NWTC inflow environment.

  17. Wind power

    International Nuclear Information System (INIS)

    Gipe, P.

    2007-01-01

    This book is a translation of the edition published in the USA under the title of ''wind power: renewable energy for home, farm and business''. In the wake of mass blackouts and energy crises, wind power remains a largely untapped resource of renewable energy. It is a booming worldwide industry whose technology, under the collective wing of aficionados like author Paul Gipe, is coming of age. Wind Power guides us through the emergent, sometimes daunting discourse on wind technology, giving frank explanations of how to use wind technology wisely and sound advice on how to avoid common mistakes. Since the mid-1970's, Paul Gipe has played a part in nearly every aspect of wind energy development from installing small turbines to promoting wind energy worldwide. As an American proponent of renewable energy, Gipe has earned the acclaim and respect of European energy specialists for years, but his arguments have often fallen on deaf ears at home. Today, the topic of wind power is cropping up everywhere from the beaches of Cape Cod to the Oregon-Washington border, and one wind turbine is capable of producing enough electricity per year to run 200 average American households. Now, Paul Gipe is back to shed light on this increasingly important energy source with a revised edition of Wind Power. Over the course of his career, Paul Gipe has been a proponent, participant, observer, and critic of the wind industry. His experience with wind has given rise to two previous books on the subject, Wind Energy Basics and Wind Power for Home and Business, which have sold over 50,000 copies. Wind Power for Home and Business has become a staple for both homeowners and professionals interested in the subject, and now, with energy prices soaring, interest in wind power is hitting an all-time high. With chapters on output and economics, Wind Power discloses how much you can expect from each method of wind technology, both in terms of energy and financial savings. The book updated models

  18. Predicting wind shear effects: A study of Minnesota wind data collected at heights up to 70 meters

    Energy Technology Data Exchange (ETDEWEB)

    Artig, R. [Minnesota Dept. of Public Service, St. Paul, MN (United States)

    1997-12-31

    The Minnesota Department of Public Service (DPS) collects wind data at carefully selected sites around the state and analyzes the data to determine Minnesota`s wind power potential. DPS recently installed advanced new monitoring equipment at these sites and began to collect wind data at 30, 50, and 70 meters above ground level, with two anemometers at each level. Previously, the Department had not collected data at heights above ground level higher than 30 meters. DPS also, with the U.S. Department of Energy (DOE), installed four sophisticated monitoring sites as part of a Tall Tower Wind Shear Study that is assessing the effects of wind shear on wind power potential. At these sites, wind data are being collected at the 10, 30, 40, 50, 60, and 70 meter heights. This paper presents the preliminary results of the analysis of wind data from all sites. These preliminary results indicate that the traditional 1/7 power law does not effectively predict wind shear in Minnesota, and the result is an underestimation of Minnesota`s wind power potential at higher heights. Using a power factor of 1/5 or 1/4 may be more accurate and provide sound justification for installing wind turbines on taller towers in Minnesota.

  19. ASN guide project. Protection of base nuclear installations against external flooding

    International Nuclear Information System (INIS)

    2010-01-01

    This guide aims at defining criteria to be taken into account to assess risks of flooding of a nuclear installation in case of external flooding, at proposing an acceptable method to assess such risks, at listing recommendations to define protection means adapted to the peculiarities of the flood risk and implemented by the operators with respect to the life phases of the installation, and in taking the climate change into account. The first part proposes an approach allowing the identification of reference situations which are to be taken into account for the flood risk. The second part deals with the quantification of parameters which characterize physical phenomena associated with these situations. The third part identifies the peculiarities of the flood risk as well as the guiding principles for designing options and protection mean selection with respect to a given flood risk

  20. 2012 Market Report on Wind Technologies in Distributed Applications

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-08-01

    An annual report on U.S. wind power in distributed applications – expanded to include small, mid-size, and utility-scale installations – including key statistics, economic data, installation, capacity, and generation statistics, and more.

  1. Wind energy global trends: Opportunities and challenges

    International Nuclear Information System (INIS)

    Ancona, D.F.

    1995-01-01

    Wind energy is one of the least cost and environmentally attractive new electricity source options for many parts of the world. Because of new wind turbine technology, reduced costs, short installation time, and environmental benefits, countries all over the world are beginning to once again develop one of the world's oldest energy technologies. A unique set of opportunities and challenges now faces the wind industry and its proponents. This paper discusses the potential and challenges of wind power. The US Department of Energy (DOE) is working closely with industry to develop new, improved wind turbine technology and to support both domestic and international deployment. The US DOE Wind Program is discussed within this context

  2. U.S. Offshore Wind Manufacturing and Supply Chain Development

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, Bruce Duncan [Navigant Consulting, Inc.

    2013-02-22

    The objective of the report is to provide an assessment of the domestic supply chain and manufacturing infrastructure supporting the U.S. offshore wind market. The report provides baseline information and develops a strategy for future development of the supply chain required to support projected offshore wind deployment levels. A brief description of each of the key chapters includes: » Chapter 1: Offshore Wind Plant Costs and Anticipated Technology Advancements. Determines the cost breakdown of offshore wind plants and identifies technical trends and anticipated advancements in offshore wind manufacturing and construction. » Chapter 2: Potential Supply Chain Requirements and Opportunities. Provides an organized, analytical approach to identifying and bounding the uncertainties associated with a future U.S. offshore wind market. It projects potential component-level supply chain needs under three demand scenarios and identifies key supply chain challenges and opportunities facing the future U.S. market as well as current suppliers of the nation’s land-based wind market. » Chapter 3: Strategy for Future Development. Evaluates the gap or competitive advantage of adding manufacturing capacity in the U.S. vs. overseas, and evaluates examples of policies that have been successful . » Chapter 4: Pathways for Market Entry. Identifies technical and business pathways for market entry by potential suppliers of large-scale offshore turbine components and technical services. The report is intended for use by the following industry stakeholder groups: (a) Industry participants who seek baseline cost and supplier information for key component segments and the overall U.S. offshore wind market (Chapters 1 and 2). The component-level requirements and opportunities presented in Section 2.3 will be particularly useful in identifying market sizes, competition, and risks for the various component segments. (b) Federal, state, and local policymakers and economic development

  3. Offshore Wind Energy Market Overview (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.

    2013-07-01

    This presentation describes the current international market conditions regarding offshore wind, including the breakdown of installation costs, how to reduce costs, and the physical siting considerations considered when planning offshore wind construction. The presentation offers several examples of international existing and planned offshore wind farm sites and compares existing international offshore resources with U.S. resources. The presentation covers future offshore wind trends and cites some challenges that the United States must overcome before it will be able to fully develop offshore wind sites.

  4. 2016 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-08-10

    The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. You can find the report, a presentation, and a data file on the Files tab, below. Additionally, several data visualizations are available in the Data Visualizations tab. Highlights of this year’s report include: -Wind power additions continued at a rapid clip in 2016: $13 billion was invested in new wind power plants in 2016. In 2016, wind energy contributed 5.6% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and 29% to 37% in three of those states—Iowa, South Dakota, and Kansas. -Bigger turbines are enhancing wind project performance: Increased blade lengths, in particular, have dramatically increased wind project capacity factors, one measure of project performance. For example, the average 2016 capacity factor among projects built in 2014 and 2015 was 42.6%, compared to an average of 32.1% among projects built from 2004 to 2011 and 25.4% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008, to $800–$1,100/kW. Overall, the average installed cost of wind projects in 2016 was $1,590/kW, down $780/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at nearly 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Texas, Iowa, Oklahoma). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The supply chain continued to adjust to swings in domestic demand for wind equipment: Wind sector employment reached a new high of

  5. Development of a guiding system and visual feedback real-time controller for the high-speed self-align optical cable winding

    International Nuclear Information System (INIS)

    Lee, Chang Woo; Kang, Hyun Kyoo; Shin, Kee Hyun

    2008-01-01

    Recently, the demand for the optical cable has been rapidly growing because of the increasing number of internet users and the high speed internet data transmission required. But the present optical cable winding systems have some serious problems such as pile-up and collapse of cables usually near the flange of the bobbin in the process of cables winding. To reduce the pile-up collapse in cable winding systems, a new guiding system is developed for a high-speed self-align cable winding. First, mathematical models for the winding process and bobbin shape fault compensation were proposed, the winding mechanism was analyzed and synchronization logics for the motions of winding, traversing, and the guiding were created. A prototype cable winding systems was manufactured to validate the new guiding system and the suggested logic. Experiment results showed that the winding system with the developed guiding system outperformed the system without the guiding system in reducing pile-up and collapse in high-speed winding

  6. Wind energy developments in the Americas

    International Nuclear Information System (INIS)

    Swisher, R.; Ancona, D.F.

    1990-01-01

    This paper will highlight the key wind energy activities and programs of American countries. In South and Central America, wind technology awareness and opportunity is spreading. Countries have projects in the beginning stages of development and many sites with excellent wind resources are believed to exist. Argentina, Costa Rica, Colombia, Mexico, and several Caribbean countries are among those active in wind energy development. In Canada, after a decade of research and systems development, the Department of Energy Mines and Resources is conducting a review of all renewable energy technologies, including wind, to develop a strategic plan for future activities. Canadian industry continues development of various vertical axis projects and the Province of Alberta has begun a program to assess wind potential in that region. In the United States, commercial application of wind energy is continuing to expand. During 1989, over 140 MW of new wind turbine capacity was installed in wind power plants, bringing the total operating in the U.S. to 14600 turbines and 1,400 MW. During 1989, these machines produced over 2.1 billion kWh, enough to supply the residential needs of Washington D.C. or San Francisco. This is an increase of 15% over the 1988 total, even though installed operating capacity dropped by about 10% as smaller, out-dated turbines were phased out or replaced. The U.S. government is in the process of formulating a new National Energy Strategy. It seems clear that renewable energy and energy efficiency will play an increasingly important role in this strategy. The U.S. wind program continues to emphasize broad-based technology development, but has also initiated conceptual design studies for an advanced wind turbine for power generation in the late 1990s. (Author)

  7. Test location Guetsch, Switzerland for wind-power installations; Teststandort fuer Windkraftanlagen Guetsch. Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Schaffner, B.; Cattin, R.; Schilter, Ch.

    2007-07-15

    This illustrated technical report for the Swiss Federal Office of Energy (SFOE) describes work done on the preliminary project for providing test facilities for wind-power installations on the 'Guetsch' location in the Swiss Alps. In the context of the Alpine Test Site Guetsch project, which involves meteorological measurements and wind turbine performance analysis research, a comprehensive infrastructure for the acquisition of climate data and the performance of wind turbines has been defined. This work is to be carried out by the Swiss Federal Office of Meteorology and Climatology MeteoSwiss and the company Meteotest within the framework of the COST Action 727 2005 - 2008 of the European Union. The aim of this preliminary study is to identify the possibilities for the realisation of an alpine test site for wind turbines based on the existing infrastructure. The economic and technical conditions for the testing of both large and small wind turbines are discussed. Topics examined include site ownership and access, infrastructure and measurement systems, financing possibilities and a timeline for implementation.

  8. 2013 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.; Barbose, G.; Darghouth, N.; Hoen, B.; Mills, A.; Weaver, S.; Porter, K.; Buckley, M.; Oteri, F.; Tegen, S.

    2014-08-01

    This annual report provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2013. This 2013 edition updates data presented in previous editions while highlighting key trends and important new developments. The report includes an overview of key installation-related trends; trends in wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development and the quantity of proposed wind power capacity in various interconnection queues in the United States.

  9. International wind energy development. World market update 2009. Forecast 2010-2014

    Energy Technology Data Exchange (ETDEWEB)

    2010-03-15

    This is the fifteenth edition of the annual World Market Update produced by BTM Consult ApS, and covers developments in the wind energy sector during 2009. As in previous editions, the report also assesses important changes over the last three years and forecasts progress for five years ahead. The special topic in this year's WMU is an evaluation of the aftermath of the COP-15 climate change negotiations in relation to future wind power development. The global market for wind power not only produced a record for new installations in 2009 of 38 GW installed capacity, it also created a new order in the balance of international wind power. The rapid increase in the rate of installations in both Asia and the US was already clear in 2008; that trend has continued at a faster pace in 2009. By far the largest number of new wind projects were seen in the US and China. Another new reality is that most of the world's manufacturing of wind turbines now takes place in China. As a result three Chinese companies are among the world's top ten turbine manufacturers. At the same time a rapid expansion of manufacturing capacity by European turbine makers has taken place in the US. Europe contributed 28.2% of the newly added capacity - 10,738 MW - taking the continent's total wind power generation capacity to 76,553 MW. The growth in Asia's markets has once again been staggering. With 14,991 MW of new installations, South and East Asia accounted for 39.4% of the global total in 2009. China was the major contributor, with 13,750 MW of new capacity, more than double that installed in 2008. In terms of cumulative installed wind power, the US is still the world leader, with 35,159 MW. China overtook Germany with a margin of less than 50 MW. China now has a total of 25,853 MW, followed by Germany's 25,813 MW. A new world order in wind power has become a reality. The forecast released in this WMU shows an average growth rate of 13.5% for the period 2010

  10. Guide related to structure sanitation in basic nuclear installations. Guide Nr 14, Release of the 30 August 2016

    International Nuclear Information System (INIS)

    2016-01-01

    This guide defines recommendations made by the ASN regarding the sanitation methodology to be applied to buildings and structures of any basic nuclear installation. After a recall of the general doctrine for the management of wastes in basic nuclear installations, the guide presents the ASN doctrine for structure sanitation which distinguishes complete sanitation, extended sanitation, and sanitation in operation phase. It presents principles for the sanitation of component structures of an area of possible production of nuclear wastes. It indicates administrative procedures to be applied before and after sanitation works, notably when the radiological condition of structures has been made compatible or not with any use. After indication of requirements in terms of quality insurance, modalities of definition of defence lines (from first to fourth) are discussed. Requirements regarding the performance of sanitation operations are reviewed

  11. Improving Ambient Wind Environments of a Cross-flow Wind Turbine near a Structure by using an Inlet Guide Structure and a Flow Deflector

    Institute of Scientific and Technical Information of China (English)

    Tadakazu TANINO; Shinichiro NAKAO; Genki UEBAYASHI

    2005-01-01

    A cross-flow wind turbine near a structure was tested for the performance. The results showed that the performance of a cross-flow wind turbine near a structure was up to 30% higher than the one without a structure.In addition, we tried to get higher performance of a cross-flow wind turbine by using an Inlet Guide Structure and a Flow Deflector. An Inlet Guide Structure was placed on the edge of a structure and a Flow Deflector was set near a cross-flow wind turbine and can improve ambient wind environments of the wind turbine, the maximum power coefficients were about 15 to 40% higher and the tip speed ratio range showing the high power coefficient was wide and the positive gradients were steep apparently.

  12. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  13. The air quality in ventilation installations. Practical guidelines; Qualite de l'air dans les installations aerauliques. Guide pratique

    Energy Technology Data Exchange (ETDEWEB)

    Angeli, L. [France Air, 91 - Chilly Mazarin (France); Bianchina, M. [Unelvent, 93 - Le Bourget (France); Blazy, M. [Anjos, 01 - Torcieu (France); Boulanger, X. [Aldes, 21 - Chenove (France); Chiesa, M. [Atlantic (France); Duclos, M. [Groupe Titanair, 69 - Lyon (France); Hubert, D.; Kridorian, O. [Groupe Astato, Blanc Mesnil (France); Josserand, O. [Carrier (Belgium); Lancieux, C. [Camfil, 60 - Saint Martin Longueau (France); Lemaire, J.C. [Agence de l' Environnement et de la Maitrise de l' Energie, ADEME, 75 - Paris (France); Petit, Ph. [Compagnie Industrielle d' Applications Thermiques ( CIAT ), 75 - Paris (France); Ribot, B. [Electricite de France (EDF), 75 - Paris (France); Tokarek, S. [Gaz de France (GDF), 75 - Paris (France); Bernard, A.M.; Tissot, A. [Centre Technique des Industries Aerauliques et Thermiques (CETIAT), 69 - Villeurbanne (France)

    2004-07-01

    The present guide aims to provide design departments, maintenance companies and builders with practical guidelines and recommendations for the installation of ventilation and air-conditioning systems. The objective is to ensure good Indoor Air Quality (IAQ) and to safeguard the health and well-being of the occupants. The guide deals with aspects of design, dimensioning, installation and servicing, all of which play a major role in guaranteeing IAQ and duct-work hygiene. These steps are reviewed for the principal ventilation systems met in both residential and commercial premises. The first part presents the system and draws the attention of the user to specific points which require particular care in term of IAQ. The second part details recommended practice component by component, in respect of design, installation and servicing. Application of these simple guidelines during the various project stages is essential, in order to ensure a good IAQ in ventilation systems. Content: introduction; good ventilation; systems: exhaust ventilation, balanced ventilation, air handling unit, terminal ventilation units, impact of systems on indoor air quality, components: air inlet, air filter, heat recovery unit, heating or cooling coil, humidifier, mechanical fan unit, cowl and hybrid ventilation fan, mixing box, ventilation duct-work, air outlet and air terminal device; references.

  14. Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Benjamin [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gleason, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Preus, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-11-01

    Wind power is one of the fastest growing sources of new electricity generation in the United States. Cumulative installed capacity was more than 74,000 megawatts (MW) at year-end 2015 and wind power supplied 4.7% of total 2015 U.S. electricity generation. Despite the growth of the wind power industry, the distributed wind market has remained limited. Cumulative installations of distributed wind through 2015 totaled 934 MW. This first-of-a-kind exploratory analysis characterizes the future opportunity for behind-the-meter distributed wind, serving primarily rural or suburban homes, farms, and manufacturing facilities. This work focuses only on the grid-connected, behind-the-meter subset of the broader distributed wind market. We estimate this segment to be approximately half of the 934 MW of total installed distributed wind capacity at year-end 2015. Potential from other distributed wind market segments including systems installed in front of the meter (e.g., community wind) and in remote, off-grid locations is not assessed in this analysis and therefore, would be additive to results presented here. These other distributed wind market segments are not considered in this initial effort because of their relatively unique economic and market attributes.

  15. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  16. Standard guide for installation of Walk-Through metal detectors

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1997-01-01

    1.1 Some facilities require that personnel entering designated areas be screened for concealed weapons and other metallic materials. Also, personnel exiting designated areas are often screened for metallic shielding material and other types of metallic contraband. Walk-through metal detectors are widely used to implement these requirements. This guide describes various elements to be considered when planning to install walk-through metal detectors. 1.2 This guide is not intended to set performance levels, nor is it intended to limit or constrain operational technologies. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  17. The Value of Wind Technology Innovation: Implications for the U.S. Power System, Wind Industry, Electricity Consumers, and Environment

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu T [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lantz, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mowers, Matthew [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wiser, Ryan [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-21

    Improvements to wind technologies have, in part, led to substantial deployment of U.S. wind power in recent years. The degree to which technology innovation will continue is highly uncertain adding to uncertainties in future wind deployment. We apply electric sector modeling to estimate the potential wind deployment opportunities across a range of technology advancement projections. The suite of projections considered span a wide range of possible cost and technology innovation trajectories, including those from a recent expert elicitation of wind energy experts, a projection based on the broader literature, and one reflecting estimates based on a U.S. DOE research initiative. In addition, we explore how these deployment pathways may impact the electricity system, electricity consumers, the environment, and the wind-related workforce. Overall, our analysis finds that wind technology innovation can have consequential implications for future wind power development throughout the United States, impact the broader electricity system, lower electric system and consumer costs, provide potential environmental benefits, and grow the U.S. wind workforce.

  18. Monitoring and Mitigation Alternatives for Protection of North Atlantic Right Whales during Offshore Wind Farm Installation

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Halvorsen, Michele B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Matzner, Shari [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stavole, Jessica [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-09-01

    Progress report on defining and determining monitoring and mitigation measures for protecting North Atlantic Right Whales from the effects of pile driving and other activities associated with installation of offshore wind farms.

  19. Indian Wind Energy Outlook 2011

    International Nuclear Information System (INIS)

    Shukla, Shruti; Kharul, Rajendra; Sawyer, Steve; Patel, Narendra; Pullen, Angelika; Gorate, Devanand; Raghu, V.

    2011-12-01

    This report is a valuable tool for members of the wind industry and policy makers alike to learn about the market opportunities and the legal and regulatory framework in India. In addition, it gives us insights into the challenges going forward and offers suggestions for overcoming remaining hurdles for wind power development. According to the outlook 65.2 GW of wind power could be installed in Indian by 2020, up from 13.1 GW at the end of 2010. This would attract around USD 10.4bn of annual investment to the sector, and create 170,000 'green collar' jobs in manufacturing, project development, installation, operation, maintenance, consulting etc. At the same time, it would save 174 tons of CO2 every year. By 2030, the installed capacity could reach as much as 160.7 GW. In order to fully exploit the indigenous energy source at its doorstep, the Indian government needs to address several challenges and barriers that are holding back development. This includes a national renewable energy law, incentives for repowering, and rapid up-scaling of grid infrastructure to transport increasing amounts of wind power to the demand centres. It highlights the key role wind power could play in fueling India's growing energy demand, by delivering substantial amounts of clean energy.

  20. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  1. Meta Isæus-Berlin: De animerade installationerna /The Animated Installations

    OpenAIRE

    Weimarck, Torsten

    2006-01-01

    Meta Isæus-Berlin: The Animated Installations Torsten Weimarck At about the same time that I saw Meta Isæus-Berlin’s remarkable installation Ett vattenhem (A Water Home) at the Bo01 Housing Fair in Malmö I also happened to see Johannes Stjärne Nilsson and Ola Simonsson’s film Music for one appartment and six drummers which was shown as a supporting film in the cinema. It struck me that these works had interesting things to say about each other; that in spite of their manife...

  2. Guide to Using the WIND Toolkit Validation Code

    Energy Technology Data Exchange (ETDEWEB)

    Lieberman-Cribbin, W.; Draxl, C.; Clifton, A.

    2014-12-01

    In response to the U.S. Department of Energy's goal of using 20% wind energy by 2030, the Wind Integration National Dataset (WIND) Toolkit was created to provide information on wind speed, wind direction, temperature, surface air pressure, and air density on more than 126,000 locations across the United States from 2007 to 2013. The numerical weather prediction model output, gridded at 2-km and at a 5-minute resolution, was further converted to detail the wind power production time series of existing and potential wind facility sites. For users of the dataset it is important that the information presented in the WIND Toolkit is accurate and that errors are known, as then corrective steps can be taken. Therefore, we provide validation code written in R that will be made public to provide users with tools to validate data of their own locations. Validation is based on statistical analyses of wind speed, using error metrics such as bias, root-mean-square error, centered root-mean-square error, mean absolute error, and percent error. Plots of diurnal cycles, annual cycles, wind roses, histograms of wind speed, and quantile-quantile plots are created to visualize how well observational data compares to model data. Ideally, validation will confirm beneficial locations to utilize wind energy and encourage regional wind integration studies using the WIND Toolkit.

  3. Assessment of U.S. Manufacturing Capability for Next-Generation Wind Turbine Drivetrains

    Energy Technology Data Exchange (ETDEWEB)

    Cotrell, J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Stelhy, T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    Robust U.S. wind turbine manufacturing capabilities and supply chains are important for the United States to reduce the cost of electricity generated from wind turbines. These capabilities and supply chains are also critical to the invention and commercialization of new wind turbine technologies while providing high-quality jobs. The development of advanced drivetrain technologies for windturbine applications is advancing the state of the art for drivetrain design by producing higher capacity and operating reliability than conventional drivetrains. Advanced drivetrain technologies such as medium-speed and direct-drive generators, silicon-carbide (SiC) IGBT-based power electronics, and high torque density speed increasers require different manufacturing and supply chaincapabilities that present both risks and opportunities for U.S. wind turbine manufacturers and the wind industry as a whole. The primary objective of this project is to assess how advanced drivetrain technologies and trends will impact U.S. wind turbine manufacturing and its supply chains. The U.S. Department of Energy and other industry participants will use the information from this study toidentify domestic manufacturing gaps, barriers, and opportunities for developing U.S. wind turbine manufacturing capabilities and supply chains for next-generation drivetrain technologies. This report also includes recommendations for prioritizing technology areas for possible investments by public, private, or nonprofit entities that will reduce the cost of wind-generated electricity. Suchinvestments foster opportunities to invent and commercialize new wind turbine technologies, and provide high-quality jobs in the United States.

  4. Wind Atlas for South Africa (WASA) – Best practice guide for application of WASA

    DEFF Research Database (Denmark)

    Hansen, Jens Carsten; Mortensen, Niels Gylling; Cronin, Tom

    The present report is a best practice guide for application of results from the Wind Atlas for South Africa (WASA). A general description of the methodological framework – the wind atlas methodology – is given, including validation results of the numerical wind atlas at 10 measurement sites...

  5. Wind energy. To produce electricity with the wind

    International Nuclear Information System (INIS)

    Bareau, Helene

    2015-11-01

    This guide addresses the different aspects of wind-based power generation. It outlines the role of wind energy to meet objectives related to the share of renewable energies in the French energy mix, that wind energy is actually replacing fossil energies, that it is based on local resources within higher safety and less wastage, that current advances are made to integrate wind energy production into the grid, and that it is a solution to diversify energy production. Some figures are presented and commented, regarding onshore wind energy production in France, the location of wind farms, and wind energy production in comparison with other renewable sources. The operation of a wind turbine is described and the different types of wind turbines are evoked. The issue of wind farm planning with citizen participation is addressed: regional planning, studies of pre-feasibility for location selection, procedure, and content of the impact study (radars, fauna and flora, landscapes, safety, health). Other features are outlined: a planned dismantling, and a globally favourable perception. The next part addresses offshore wind energy: the interesting potential of stronger and more reliable wind at sea (European situation, French opportunities, elements comprised in an offshore wind farm), impacts (on marine ecosystems, on neighbouring localities, and interests for visitors). Economic aspects are then addressed: cost and profitability, economic spin-offs, and perspectives. The last part concerns individuals and the possibilities to participate to wind farm projects or to invest in small wind turbines with some prerequisites (constant and steady winds, installation assessment, required expertise, indispensable preliminary steps, costs, aids and profitability)

  6. In situ observations of the influence of a large onshore wind farm on near-surface temperature, turbulence intensity and wind speed profiles

    Science.gov (United States)

    Smith, Craig M.; Barthelmie, R. J.; Pryor, S. C.

    2013-09-01

    Observations of wakes from individual wind turbines and a multi-megawatt wind energy installation in the Midwestern US indicate that directly downstream of a turbine (at a distance of 190 m, or 2.4 rotor diameters (D)), there is a clear impact on wind speed and turbulence intensity (TI) throughout the rotor swept area. However, at a downwind distance of 2.1 km (26 D downstream of the closest wind turbine) the wake of the whole wind farm is not evident. There is no significant reduction of hub-height wind speed or increase in TI especially during daytime. Thus, in high turbulence regimes even very large wind installations may have only a modest impact on downstream flow fields. No impact is observable in daytime vertical potential temperature gradients at downwind distances of >2 km, but at night the presence of the wind farm does significantly decrease the vertical gradients of potential temperature (though the profile remains stably stratified), largely by increasing the temperature at 2 m.

  7. In situ observations of the influence of a large onshore wind farm on near-surface temperature, turbulence intensity and wind speed profiles

    International Nuclear Information System (INIS)

    Smith, Craig M; Barthelmie, R J; Pryor, S C

    2013-01-01

    Observations of wakes from individual wind turbines and a multi-megawatt wind energy installation in the Midwestern US indicate that directly downstream of a turbine (at a distance of 190 m, or 2.4 rotor diameters (D)), there is a clear impact on wind speed and turbulence intensity (TI) throughout the rotor swept area. However, at a downwind distance of 2.1 km (26 D downstream of the closest wind turbine) the wake of the whole wind farm is not evident. There is no significant reduction of hub-height wind speed or increase in TI especially during daytime. Thus, in high turbulence regimes even very large wind installations may have only a modest impact on downstream flow fields. No impact is observable in daytime vertical potential temperature gradients at downwind distances of >2 km, but at night the presence of the wind farm does significantly decrease the vertical gradients of potential temperature (though the profile remains stably stratified), largely by increasing the temperature at 2 m. (letter)

  8. International wind energy development. World market update 2010. Forecast 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    This is the sixteenth edition of the annual World Market Update produced by BTM Consult ApS - a part of Navigant Consulting, and covers developments in the wind energy sector during 2010. As in previous editions, the report also assesses important changes over the last three years and forecasts progress for five years ahead. The special topic in this year's WMU is a review of Direct-Drive concept versus traditional Drive Train with gearbox. The global market for wind power produced a record for new installations in 2010 of 39.4 GW installed capacity, however, with a much lower growth rate than in the period 2005 to 2009. The rapid increase in the rate of installations in both Asia and the US was already clear in 2008-09. That trend has continued in China but the US experienced a significant slow-down in 2010. Europe stayed relatively stable - old markets stagnated but new emerging markets grew. Another new reality is that most of the world's manufacturing of wind turbines now takes place in China. Companies producing wind turbines there have experienced an explosive rate of growth. As a result four Chinese companies are among the world's Top Ten turbine manufacturers. An inevitable impact of this shift is that the market shares of the traditional industry leaders from the US and Europe have decreased significantly with Vestas and Siemens as exception in 2010. At the same time a rapid expansion of manufacturing capacity by European turbine makers has taken place in the US. Europe contributed 29.9% of the newly added capacity - 10,920 MW - taking the continent's total wind power generation capacity to 87,565 MW. The growth in Asia's markets has once again been staggering. With 21,130 MW of new installations, South and East Asia accounted for 53.6% of the global total in 2010.China was the major contributor, with 18,928 MW of new capacity, 37% over that of 2009. In terms of cumulative installed wind power, China surpassed the US in 2010, with

  9. Wind or water turbine power augmentation using the system of guiding surfaces

    International Nuclear Information System (INIS)

    Bashurin, V P; Ktitorov, L V; Lazareva, A S; Pletenev, F A; Budnikov, I N; Hatunkin, V Yu; Klevtsov, V A; Meshkov, E E; Novikova, I A; Yanbaev, G M

    2016-01-01

    As fluid flows through a conventional wind or hydro turbine, it slows from losing energy to extraction from a turbine and spreads out to a wider area. This results in a loss of turbine efficiency. In order to exploit wind or water flow power more effectively, it was suggested to place the turbine inside a system of specially designed airfoils (‘a flow booster’). One part of the booster (‘a nozzle’) improves the turbine performance by speeding up the flow acting on the turbine blades. The other part of the accelerating system (‘a diffuser’) creates a field of low pressure behind the turbine which helps to draw more mass flow to the turbine and avoid the loss of efficiency due to flow deceleration. The flow booster accumulates the kinetic energy of the flow (e.g. river flow or wind) in a small volume where the smaller turbine can be installed. Another possible application of the booster could be the improvement of wind turbine efficiency during low wind period. The present paper also discusses the possibility of kinetic energy accumulation by the use of several accelerating systems of different sizes—the smaller one can be installed inside the bigger one. It helps to accumulate even more kinetic energy on the turbine blades. We call this method the kinetic energy cumulation. Lab and field experiments and CFD simulations of shrouded turbine demonstrate significant increase in velocity in comparison of those for conventional (bare) turbines. (paper)

  10. Use of wind power forecasting in operational decisions.

    Energy Technology Data Exchange (ETDEWEB)

    Botterud, A.; Zhi, Z.; Wang, J.; Bessa, R.J.; Keko, H.; Mendes, J.; Sumaili, J.; Miranda, V. (Decision and Information Sciences); (INESC Porto)

    2011-11-29

    The rapid expansion of wind power gives rise to a number of challenges for power system operators and electricity market participants. The key operational challenge is to efficiently handle the uncertainty and variability of wind power when balancing supply and demand in ths system. In this report, we analyze how wind power forecasting can serve as an efficient tool toward this end. We discuss the current status of wind power forecasting in U.S. electricity markets and develop several methodologies and modeling tools for the use of wind power forecasting in operational decisions, from the perspectives of the system operator as well as the wind power producer. In particular, we focus on the use of probabilistic forecasts in operational decisions. Driven by increasing prices for fossil fuels and concerns about greenhouse gas (GHG) emissions, wind power, as a renewable and clean source of energy, is rapidly being introduced into the existing electricity supply portfolio in many parts of the world. The U.S. Department of Energy (DOE) has analyzed a scenario in which wind power meets 20% of the U.S. electricity demand by 2030, which means that the U.S. wind power capacity would have to reach more than 300 gigawatts (GW). The European Union is pursuing a target of 20/20/20, which aims to reduce greenhouse gas (GHG) emissions by 20%, increase the amount of renewable energy to 20% of the energy supply, and improve energy efficiency by 20% by 2020 as compared to 1990. Meanwhile, China is the leading country in terms of installed wind capacity, and had 45 GW of installed wind power capacity out of about 200 GW on a global level at the end of 2010. The rapid increase in the penetration of wind power into power systems introduces more variability and uncertainty in the electricity generation portfolio, and these factors are the key challenges when it comes to integrating wind power into the electric power grid. Wind power forecasting (WPF) is an important tool to help

  11. Indian Wind Energy Outlook 2011

    Energy Technology Data Exchange (ETDEWEB)

    Shukla, Shruti; Kharul, Rajendra; Sawyer, Steve; Patel, Narendra; Pullen, Angelika; Gorate, Devanand; Raghu, V. (eds.)

    2011-12-15

    This report is a valuable tool for members of the wind industry and policy makers alike to learn about the market opportunities and the legal and regulatory framework in India. In addition, it gives us insights into the challenges going forward and offers suggestions for overcoming remaining hurdles for wind power development. According to the outlook 65.2 GW of wind power could be installed in Indian by 2020, up from 13.1 GW at the end of 2010. This would attract around USD 10.4bn of annual investment to the sector, and create 170,000 'green collar' jobs in manufacturing, project development, installation, operation, maintenance, consulting etc. At the same time, it would save 174 tons of CO2 every year. By 2030, the installed capacity could reach as much as 160.7 GW. In order to fully exploit the indigenous energy source at its doorstep, the Indian government needs to address several challenges and barriers that are holding back development. This includes a national renewable energy law, incentives for repowering, and rapid up-scaling of grid infrastructure to transport increasing amounts of wind power to the demand centres. It highlights the key role wind power could play in fueling India's growing energy demand, by delivering substantial amounts of clean energy.

  12. 2015 Distributed Wind Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Foster, Nikolas A.F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Homer, Juliet S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Morris, Scott L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-17

    The U.S. Department of Energy’s (DOE’s) annual Distributed Wind Market Report provides stakeholders with statistics and analysis of the market along with insights into its trends and characteristics. By providing a comprehensive overview of the distributed wind market, this report can help plan and guide future investments and decisions by industry, utilities, federal and state agencies, and other interested parties.

  13. U.S. Hail Frequency and the Global Wind Oscillation

    Science.gov (United States)

    Gensini, Vittorio A.; Allen, John T.

    2018-02-01

    Changes in Earth relative atmospheric angular momentum can be described by an index known as the Global Wind Oscillation. This global index accounts for changes in Earth's atmospheric budget of relative angular momentum through interactions of tropical convection anomalies, extratropical dynamics, and engagement of surface torques (e.g., friction and mountain). It is shown herein that U.S. hail events are more (less) likely to occur in low (high) atmospheric angular momentum base states when excluding weak Global Wind Oscillation days, with the strongest relationships found in the boreal spring and fall. Severe, significant severe, and giant hail events are more likely to occur during Global Wind Oscillation phases 8, 1, 2, and 3 during the peak of U.S. severe weather season. Lower frequencies of hail events are generally found in Global Wind Oscillation phases 4-7 but vary based on Global Wind Oscillation amplitude and month. In addition, probabilistic anomalies of atmospheric ingredients supportive of hail producing supercell thunderstorms closely mimic locations of reported hail frequency, helping to corroborate report results.

  14. Study of turbine and guide vanes integration to enhance the performance of cross flow vertical axis wind turbine

    Science.gov (United States)

    Wibowo, Andreas; Tjahjana, Dominicus Danardono Dwi Prija; Santoso, Budi; Situmorang, Marcelinus Risky Clinton

    2018-02-01

    The main purpose of this study is to investigate the best configuration between guide vanes and cross flow vertical axis wind turbine with variation of several parameters including guide vanes tilt angle and the number of turbine and guide vane blades. The experimental test were conducted under various wind speed and directions for testing cross flow wind turbine, consisted of 8, 12 and 16 blades. Two types of guide vane were developed in this study, employing 20° and 60° tilt angle. Both of the two types of guide vane had three variations of blade numbers which had same blade numbers variations as the turbines. The result showed that the configurations between 60° guide vane with 16 blade numbers and turbine with 16 blade numbers had the best configurations. The result also showed that for certain configuration, guide vane was able to increase the power generated by the turbine significantly by 271.39% compared to the baseline configuration without using of guide vane.

  15. Wind power barometer

    International Nuclear Information System (INIS)

    2014-01-01

    The worldwide wind power increased by 12.4% in 2013 to reach 318.6 GW but the world market globally decreased by losing 10 GW: only 35.6 GW have been installed in 2013 which is even less than was installed in 2009. This activity contraction is mainly due to the collapse of the American market, American authorities having been late to decide to maintain federal incentives. The European wind power market also contracted in 2013 because of the lack of trust of the investors in the new energy policies of the European governments. In the rest of the world wind energy has kept on growing particularly in China and Canada. At the end of 2013 the cumulated wind power reached 117,73 GW in Europe. About 1.5 MW out of 10 MW of wind power installed in Europe in 2013 come from off-shore wind farms, United-Kingdom and Denmark being the most important players by totalling more than 70% of the off-shore wind power installed at the end of 2013. Various charts and tables give the figures of the wind power cumulated and installed in 2013 in different parts of the world: Europe, North America and Asia, the time evolution of the worldwide wind power since 1995, the wind power cumulated and installed in 2013 for the different countries of Europe and the ratio between the cumulated wind power and the country population. A table lists the main manufacturers of wind turbines and gives their turnover and number of employees at the end of 2013

  16. Effects of a wind farm installation on the understory bat community of a highly biodiverse tropical region in Mexico

    Directory of Open Access Journals (Sweden)

    Miguel Briones-Salas

    2017-06-01

    Full Text Available Wind energy has rapidly become an important alternative among renewable energies, and it is generally considered clean. However, little is known about its impact at the level of ecological communities, especially in biodiversity hotspots. The Isthmus of Tehuantepec is a highly biodiverse region in Mesoamerica, and has the highest potential for generating wind energy in Mexico. To assess the effects of installing a wind farm on the understory bat community in a landscape of fragmented habitat, we assessed its diversity and composition over four stages of installation (site preparation, construction, and two stages of operation. We captured 919 bats belonging to 22 species. Species richness, functional diversity and phylogenetic diversity decreased during construction and the first stage of operation. However, these components of biodiversity increased during the second stage of operation, and species composition began to resemble that of the site preparation stage. No species considered as sensitive to disturbance was recorded at any stage. This is the first study to reveal the diversity of a Neotropical bat community after wind turbines begin to operate.

  17. Effects of a wind farm installation on the understory bat community of a highly biodiverse tropical region in Mexico

    Science.gov (United States)

    Lavariega, Mario C.; Moreno, Claudia E.

    2017-01-01

    Wind energy has rapidly become an important alternative among renewable energies, and it is generally considered clean. However, little is known about its impact at the level of ecological communities, especially in biodiversity hotspots. The Isthmus of Tehuantepec is a highly biodiverse region in Mesoamerica, and has the highest potential for generating wind energy in Mexico. To assess the effects of installing a wind farm on the understory bat community in a landscape of fragmented habitat, we assessed its diversity and composition over four stages of installation (site preparation, construction, and two stages of operation). We captured 919 bats belonging to 22 species. Species richness, functional diversity and phylogenetic diversity decreased during construction and the first stage of operation. However, these components of biodiversity increased during the second stage of operation, and species composition began to resemble that of the site preparation stage. No species considered as sensitive to disturbance was recorded at any stage. This is the first study to reveal the diversity of a Neotropical bat community after wind turbines begin to operate. PMID:28630802

  18. Effects of a wind farm installation on the understory bat community of a highly biodiverse tropical region in Mexico.

    Science.gov (United States)

    Briones-Salas, Miguel; Lavariega, Mario C; Moreno, Claudia E

    2017-01-01

    Wind energy has rapidly become an important alternative among renewable energies, and it is generally considered clean. However, little is known about its impact at the level of ecological communities, especially in biodiversity hotspots. The Isthmus of Tehuantepec is a highly biodiverse region in Mesoamerica, and has the highest potential for generating wind energy in Mexico. To assess the effects of installing a wind farm on the understory bat community in a landscape of fragmented habitat, we assessed its diversity and composition over four stages of installation (site preparation, construction, and two stages of operation). We captured 919 bats belonging to 22 species. Species richness, functional diversity and phylogenetic diversity decreased during construction and the first stage of operation. However, these components of biodiversity increased during the second stage of operation, and species composition began to resemble that of the site preparation stage. No species considered as sensitive to disturbance was recorded at any stage. This is the first study to reveal the diversity of a Neotropical bat community after wind turbines begin to operate.

  19. The Distributed Wind Cost Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, Trudy; Jimenez, Tony; Preus, Robert; Tegen, Suzanne; Baring-Gould, Ian

    2017-03-28

    To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbine costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.

  20. HNEI wind-hydrogen program

    International Nuclear Information System (INIS)

    Neill, D.; Holst, B.; Yu, C.; Huang, N.; Wei, J.

    1990-01-01

    This paper reports on wind powered hydrogen production which is promising for Hawaii because Hawaii's wind energy potential exceeds the state's current electrical energy requirements by more than twenty-fold. Wind energy costs are now approaching $0.06 to $0.08/kWh, and the U.S. Department of Energy has set a goal of $0.04/kWh. These conditions make wind power a good source for electrolytic production of hydrogen. HNEI's wind-hydrogen program, at the HNEI-Kahua Wind Energy Storage Test facility on the island of Hawaii, is developing energy storage and power electronic systems for intermittent wind and solar devices to provide firm power to the utility or to a stand-alone hybrid system. In mid 1990, the first wind-hydrogen production/storage/ generation system is scheduled for installation. HNEI's wind- hydrogen program will provide research, development, demonstration, and education on the great potential and benefits of hydrogen

  1. Lightning Damage to Wind Turbine Blades From Wind Farms in the U.S

    DEFF Research Database (Denmark)

    Candela Garolera, Anna; Madsen, Søren Find; Nissim, Maya

    2016-01-01

    , laminate structure, and lightning protection systems. The statistics consist of the distribution of lightning damage along the blade and classify the damage by severity. In addition, the frequency of lightning damage to more than one blade of a wind turbine after a thunderstorm is assessed. The results......This paper presents statistical data about lightning damage on wind turbine blades reported at different wind farms in the U.S. The analysis is based on 304 cases of damage due to direct lightning attachment on the blade surface. This study includes a large variety of blades with different lengths...

  2. International wind energy development. World market update 2006. Forecast 2007-2011

    International Nuclear Information System (INIS)

    2007-03-01

    The report covers development in the international wind power market during 2006 and the new Forecast until 2011. Furthermore a long term Prediction is made up to 2016. With 15,016 MW of new installations, the total installed capacity of wind power grew to around 74,300 MW. This was an increase in cumulative installation of 25%. Looking at the annual installation of 15,016 MW there was an increase of 30%. This is on top of a 2005 growth of 42%. The key figures for development during 2006 were: a) 15,016 MW of newly installed wind power capacity. b)Cumulative installed capacity by the end of 2006 reached 74,306 MW, consisting of around 10,600 wind turbines dispersed in 36 countries. c) Europe maintained its role as the largest wind power continent. 51% of all new installation in 2006 took place in Europe. d) The Americas had a record year thanks to the development in the US, where 2,454 MW of new capacity was added. The reason is the PTC (Production Tax Credit) in the US market in force again and will be so until end of 2008. The Americas accounted for 23.4% of the world's installation in 2006. e) Asia showed significant growth. Including OECD Pacific, Asia doubled its installation, from 7,890 MW in 2005 to 11.601 MW by the end of 2006. India was by far the leading country, with 1,840 MW of new capacity in 2006. China also showed strong progress, with almost 1,334 MW of new installation. The region as a whole accounted for 24.7% of the year's world wide total. f) Among the Top Ten markets USA maintained its position as largest market in 2006. Germany, the world's largest market for a decade, increased its installation from 2005 to installing 2.233 MW, after three year on decline. It is, however, enough to maintain their position as no. 2 market in the world. France and Portugal showed remarkable growth. Spain is still No.2 market in Europe, with 1,587 MW of new installation. g) Penetration of wind power in the world's electricity supply reached 0.82% by the end of

  3. Model Development for Power System Analysis with a Substantial Wind Energy Capacity Installed in the Nordic grid

    DEFF Research Database (Denmark)

    Carlson, Ola; Perdana, Abram; Chen, Peiyuan

    2011-01-01

    The worldwide development of wind power installations now includes planning and construction of large-scale wind farms ranging in magnitudes of 1000 MW and more. As part of the planning and design of such systems, it is well established that the transient and dynamic stability of the electrical...... power system needs to be studied. Modelling work of the electrical behaviour of wind turbines and wind farms as well as model validation by measurements have been important parts of this project work. The models have been used to study dynamic phenomena during normal operation and fault occasions...... in the electric system. Fault Ride Through (FRT) measurements have been carried out on new wind parks connected to Estonian power grid and in all of them FRT tests were made. In several wind parks the tests were not successful and the tests will be repeated. In Finland measurements have carried out in 6 MW...

  4. U.S. Department of Energy Wind Turbine Development Projects

    International Nuclear Information System (INIS)

    Migliore, P.G.; Calvert, S.D.

    1999-01-01

    This paper provides an overview of wind-turbine development activities in the Unites States and relates those activities to market conditions and projections. Several factors are responsible for a surge in wind energy development in the United States, including a federal production tax credit, ''green power'' marketing, and improving cost and reliability. More development is likely, as approximately 363 GW of new capacity will be needed by 2020 to meet growing demand and replace retiring units. The U.S. Department of Energy (DOE) is helping two companies develop next-generation turbines intended to generate electricity for $0.025/kWh or less. We expect to achieve this objective through a combination of improved engineering methods and configuration advancements. This should ensure that wind power will compete effectively against advanced combined-cycle plants having projected generating costs of $0.031/kWh in 2005. To address the market for small and intermediate-size wind turbines, DOE is assisting five companies in their attempts to develop new turbines having low capital cost and high reliability. Additional information regarding U.S. wind energy programs is available on the internet site www.nrel.gov/wind/. E-mail addresses for the turbine manufacturers are found in the Acknowledgements

  5. Havsnaes Wind Farm. A guide on Health and Safety

    Energy Technology Data Exchange (ETDEWEB)

    Wettin, Martina [Goovinn, Goeteborg (Sweden); Jiven, Anna [Nordisk Vindkraft, Goeteborg (Sweden)

    2011-07-01

    This guide has been developed by Nordisk Vindkraft in co-operation with Energimyndigheten (the Swedish Energy Agency). The main purpose is to raise the attention to work environment matters when developing, constructing and operating large-scale wind farms in the northern parts of Sweden. The Swedish wind industry is relatively young. Work Environment Management and legal awareness has been identified by the Swedish Government as one crucial factor for ensuring sound and rapid development of the industry. Havsnaes is to date the largest onshore wind farm in Sweden. Whilst developing this project, Nordisk Vindkraft has gained extensive experience and developed a profound understanding of the prerequisites for the Swedish large-scale wind industry. The wind farm's size, complexity and geographical location near Stroemsund in Jaemtland qualify the project as an excellent pilot study. Preventing accidents and ill-health largely depends on your knowledge, competence and the resources you are able and willing to spend. The key for success is a pro-active approach. During the Havsnaes project, Nordisk Vindkraft has spent considerable amount of time and effort on the management of Work Environment. We hope our gained experience will be beneficial for our industry as a whole.

  6. Ulysses Observations of Tripolar Guide-Magnetic Field Perturbations Across Solar Wind Reconnection Exhausts

    Science.gov (United States)

    Eriksson, S.; Peng, B.; Markidis, S.; Gosling, J. T.; McComas, D. J.; Lapenta, G.; Newman, D. L.

    2014-12-01

    We report observations from 15 solar wind reconnection exhausts encountered along the Ulysses orbit beyond 4 AU in 1996-1999 and 2002-2005. The events, which lasted between 17 and 45 min, were found at heliospheric latitudes between -36o and 21o with one event detected as high as 58o. All events shared a common characteristic of a tripolar guide-magnetic field perturbation being detected across the observed exhausts. The signature consists of an enhanced guide field magnitude within the exhaust center and two regions of significantly depressed guide-fields adjacent to the center region. The events displayed magnetic field shear angles as low as 37o with a mean of 89o. This corresponds to a strong external guide field relative to the anti-parallel reconnecting component of the magnetic field with a mean ratio of 1.3 and a maximum ratio of 3.1. A 2-D kinetic reconnection simulation for realistic solar wind conditions reveals that tripolar guide fields form at current sheets in the presence of multiple X-lines as two magnetic islands interact with one another for such strong guide fields. The Ulysses observations are also compared with the results of a 3-D kinetic simulation of multiple flux ropes in a strong guide field.

  7. 2015 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoen, Ben [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rand, Joe [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Porter, Kevin [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-08-01

    This annual report--now in its tenth year--provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation trends and then covers an array of industry and technology trends. The report also discusses project performance, wind turbine prices, project costs, operations and maintenance expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments, expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments.

  8. US wind finance : is there a special case for finance?

    Energy Technology Data Exchange (ETDEWEB)

    Pospisil, R.

    2006-03-15

    The issues exercising the US wind finance sector were discussed at two recent high-level financing and investment events in New York. The financial community still tends to be cautious about wind projects; more sophisticated forecasting of wind availability is reducing the complications posed by wind's variability but as much wind data as possible is vital. Projects involve large areas of land with multiple owners, long distances of buried cable and often difficult terrain. Some commentators believe that, as oil and gas prices rise, utilities will start to choose wind for its inherent benefits rather than to meet state Renewable Portfolio Standards (RPS) and to take advantage of generous national tax credits. However, few utilities are currently prepared to sign contracts lasting more than a year or two. Transmission and connection to the national grid remain problem areas, as are the threat posed by imbalance penalties imposed by some utilities when a project's output deviates from that scheduled. Utilities are also imposing tougher performance standards on wind projects. The periodic expiry and need for renewal by Congress of the Production Tax Credit (PTC) is seen as the biggest 'wild card' in US wind financing, as its volatility unsettles many bankers. Some wind developers would prefer a national RPS rather than the PTC to provide greater stability.

  9. 2013 Distributed Wind Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C.; Rhoads-Weaver, H. E.; Flowers, Larry T.; Gagne, Matthew N.; Pro, Boyd H.; Foster, Nikolas AF

    2014-08-20

    The purpose of this report is to quantify and summarize the 2013 U.S. distributed wind market to help plan and guide future investments and decisions by industry stakeholders, utilities, state and federal agencies, and other interested parties.

  10. Wind generation systems for remote communities: market assessment and guidelines for wind turbines selection

    International Nuclear Information System (INIS)

    Brothers, C.

    1993-06-01

    Wind technology and its market potential in remote communities of the Canadian North were discussed. These communities, unserviced by the main utility electricity grid, generate their own electricity using high quality, expensive diesel fuel to power diesel driven generators. The logistics of delivering fuel to these remote communities is an expensive operation. Wind resource in many of these communities is substantial and wind energy is seen as a prime candidate for supplying electricity to many potential sites in the Arctic and also areas in Quebec and Newfoundland. However, the severe service (i.e., cold climate, remote locations with limited facilities) requires special considerations to ensure that equipment installed performs reliably. This report described some demonstration projects in northern Canada over the last ten years, where an understanding of the special needs of wind turbines in remote areas has been developed. A guide which assessed the suitability of wind turbines for Arctic applications was included to assist organisations in preparing requirements to be used in acquiring wind turbines for use in cold regions. Refs., tabs., figs

  11. Wind power installations in Switzerland - Guidelines for the analysis of environmental impact; Windkraftanlagen in der Schweiz - Leitfaden fuer die Analyse der Umweltauswirkungen

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) provides guidelines concerning the impact of the construction of wind-energy installations on the environment in Switzerland. The report aims to ascertain the relevant environmental aspects of the construction of such wind turbines. If no relevant restrictions apply, the acceptance of such wind power installations is said to increase. The guidelines also recommend a standardised course of action and provide sources of information for investors that are necessary for successful planning. The results which can be obtained by using these guidelines can be used to compile a short-form report for cantonal environment protection agencies. An appendix contains an example of the structure of such a report.

  12. Wind energy basics a guide to home- and community-scale wind energy systems

    CERN Document Server

    Gipe, Paul

    2009-01-01

    The availability of clean, renewable power is without question going to be the defining challenge and goal of the 21st century, and wind will lead the way. Internationally acclaimed wind energy expert Paul Gipe is as soberly critical of past energy mistakes as he is convincingly optimistic about the future. The overwhelming challenge of transforming our world from one of fossil carbon to one of clean power seems daunting at best-and paralyzingly impractical at worst. "Wind Energy Basics" offers a solution. Wind power can realistically not only replace the lion's share of oil-, coal-, and natural gasndash; fired electrical plants in the U.S., but also can add enough extra power capacity to allow for most of the cars in the nation to run on electricity. Gipe explains why such a startlingly straightforward solution is eminently doable and can be accomplished much sooner than previously thought-and will have the capacity to resuscitate small and regional economies. "Wind Energy Basics" offers a how-to for home-ba...

  13. The Beginner's Guide to Wind Tunnels with TunnelSim and TunnelSys

    Science.gov (United States)

    Benson, Thomas J.; Galica, Carol A.; Vila, Anthony J.

    2010-01-01

    The Beginner's Guide to Wind Tunnels is a Web-based, on-line textbook that explains and demonstrates the history, physics, and mathematics involved with wind tunnels and wind tunnel testing. The Web site contains several interactive computer programs to demonstrate scientific principles. TunnelSim is an interactive, educational computer program that demonstrates basic wind tunnel design and operation. TunnelSim is a Java (Sun Microsystems Inc.) applet that solves the continuity and Bernoulli equations to determine the velocity and pressure throughout a tunnel design. TunnelSys is a group of Java applications that mimic wind tunnel testing techniques. Using TunnelSys, a team of students designs, tests, and post-processes the data for a virtual, low speed, and aircraft wing.

  14. 2008 WIND TECHNOLOGIES MARKET REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H.; Bolinger, Mark; Barbose, G.; Mills, A.; Rosa, A.; Porter, K.; Fink, S.; Tegen, S.; Musial, W.; Oteri, F.; Heimiller, D.; Rberts, B.; Belyeu, K.; Stimmel, R.

    2009-07-15

    The U.S. wind industry experienced a banner year in 2008, again surpassing even optimistic growth projections from years past. At the same time, the last year has been one of upheaval, with the global financial crisis impacting near-term growth prospects for the wind industry, and with federal policy changes enacted to push the industry towards continued aggressive expansion. This rapid pace of development has made it difficult to keep up with trends in the marketplace. Yet, the need for timely, objective information on the industry and its progress has never been greater. This report - the third of an ongoing annual series - attempts to meet this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2008. As with previous editions, this report begins with an overview of key wind power installation-related trends: trends in wind capacity growth in the U.S., how that growth compares to other countries and generation sources, the amount and percentage of wind in individual states and serving specific utilities, and the quantity of proposed wind capacity in various interconnection queues in the United States. Next, the report covers an array of wind industry trends, including developments in turbine manufacturer market share, manufacturing and supply-chain investments, wind turbine and wind project size, project financing developments, and trends among wind power developers, project owners, and power purchasers. The report then turns to a discussion of wind project price, cost, and performance trends. In so doing, it reviews the price of wind power in the United States, and how those prices compare to the cost of fossil-fueled generation, as represented by wholesale power prices. It also describes trends in installed wind project costs, wind turbine transaction prices, project performance, and operations and maintenance expenses. Next, the report examines other policy and market factors impacting the

  15. Financing wind power projects : perspectives from the US market

    International Nuclear Information System (INIS)

    Alam, M.

    2005-01-01

    This presentation outlined the recent assignments, core competencies and scope of services provided by Alyra Renewable Energy Finance Advisors. Renewable energy developers seek Alyra's assistance in developing strategies to achieve the most competitive solutions in finance and strategy. Alyra has broad finance expertise in renewable energy projects, a deep knowledge of markets and a significant wind industry network. Alyra identifies emerging issues, completes financing solutions and helps with contract negotiations. This presentation outlined the notable features of wind financing, wind assessment, offtake arrangements, equity considerations, US wind debt markets, long term bank financing, and combined bank and private placement financing. It also included recent debt market activity for seven large wind farms in the United States. tabs., figs

  16. Energy Optimization Assessment at U.S. Army Installations: Fort Bliss, TX

    Science.gov (United States)

    2008-09-01

    Log dampers, temperatures, actuator signals, and other parameters to identify problems. Adjust chiller and boiler setpoints and control curves...installation. The lowest setpoints were found in the Centennial Club, with 52 °F during unoccupied hours (morn- ing). The chillers ran pretty much fully loaded...ER D C/ CE R L TR -0 8 -1 5 Energy Optimization Assessment at U.S. Army Installations Fort Bliss, TX David M. Underwood, Alexander M

  17. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    Energy Technology Data Exchange (ETDEWEB)

    McGowin, C.; DeMeo, E. [Electric Power Research Institute, Palo Alto, CA (United States); Calvert, S. [Dept. of Energy, Washington, DC (United States)] [and others

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  18. Autologous US-guided PRP injection versus US-guided focal extracorporeal shock wave therapy for chronic lateral epicondylitis: A minimum of 2-year follow-up retrospective comparative study.

    Science.gov (United States)

    Alessio-Mazzola, Mattia; Repetto, Ilaria; Biti, Besmir; Trentini, Roberto; Formica, Matteo; Felli, Lamberto

    2018-01-01

    To compare the efficacy of two independent groups of patients treated with ultrasound (US)-guided extracorporeal shock wave (ESW) therapy and with US-guided injection of platelet-rich plasma (PRP) for chronic lateral epicondylitis (LE) with a minimum of 2-year follow-up. We retrospectively evaluated 63 patients treated for chronic LE (31 patients with autologous US-guided PRP injection and 32 patients with US-guided focal ESW therapy) from 2009 to 2014. All the patients were evaluated by means of Roles-Maudsley (RM) score, quick Disabilities of Arm, Shoulder, and Hand (QuickDASH) score, visual analogic scale (VAS) and patient-rated tennis elbow evaluation (PRTEE) to retrospectively assess the pain relief, level of activity, the self-reported function and subjective satisfaction at minimum of 2-year follow-up. Both US-guided autologous PRP injection and US-guided focal ESW administration proved effective in chronic LE with significant improvement in the QuickDASH, VAS, RM and PRTEE scores ( p 0.05). The mean time between treatment and symptom resolution was significantly shorter for the PRP treatment ( p = 0.0212); furthermore, the mean time to return to the normal activities was quicker for PRP group ( p = 0.0119). Both PRP injection and ESW therapy are feasible and safe options for the treatment of chronic LE with low risk of complications and with good long-term follow-up results. US-guided PRP injection has quick efficacy when compared with US-guided focal ESW therapy.

  19. Costa de Cocos 11-kW wind-diesel hybrid system

    Energy Technology Data Exchange (ETDEWEB)

    Corbus, D. [National Renewable Energy Lab., Golden, CO (United States); Bergey, M. [Bergey Windpower Company, Norman, OK (United States)

    1997-12-31

    Costa de Cocos is a small resort located in the state of Quintana Roo, Mexico. Using the existing diesel generator, the resort`s power system was retrofitted to a wind-hybrid diesel system. The reason for this retrofit was to supply 24-hour power, to reduce diesel fuel by using wind energy, and to reduce diesel air and noise emissions in order to promote ecotourism. The wind system was installed in October 1996 with cost-shared funding from the U.S. Department of Energy/U.S. Agency for International Development renewable energy program in Mexico. The National Renewable Energy Laboratory (NREL) supplied technical assistance to the project. Discussed in this paper are the system design, installation, and initial performance.

  20. Costa de Cocos 11-kW wind-diesel hybrid system

    Energy Technology Data Exchange (ETDEWEB)

    Corbus, D [National Renewable Energy Lab., Golden, CO (United States); Bergey, M [Bergey Windpower Co., Norman, OK (United States)

    1997-09-01

    Costa de Cocos is a small resort located in the state of Quintana Roo, Mexico. Using the existing diesel generator, the resort`s power system was retrofitted to a wind-hybrid diesel system. The reason for this retrofit was to supply 24-hour power, to reduce diesel fuel by using wind energy, and to reduce diesel air and noise emissions in order to promote ecotourism. The wind system was installed in October 1996 with cost-shared funding from the U.S. Department of Energy/U.S. Agency for International Development renewable energy program in Mexico. The National Renewable Energy Laboratory (NREL) supplied technical assistance to the project. Discussed in this paper are the system design, installation, and initial performance.

  1. Guide of the environmental impact of the wind farms; Guide de l'etude d'impact sur l'environnement des parcs eoliens

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This guide provides a general approach and a methodology of implementing environmental evaluations of the wind farms: the regulatory framework of the impact study, the methodology of the study, the natural areas, landscape and heritage, noise and public health and the specific case of offshore wind turbines. (A.L.B.)

  2. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  3. Jobs and Economic Development Impact (JEDI) Model: Offshore Wind User Reference Guide

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Goldberg, M.; Keyser, D.

    2013-06-01

    The Offshore Wind Jobs and Economic Development Impact (JEDI) model, developed by NREL and MRG & Associates, is a spreadsheet based input-output tool. JEDI is meant to be a user friendly and transparent tool to estimate potential economic impacts supported by the development and operation of offshore wind projects. This guide describes how to use the model as well as technical information such as methodology, limitations, and data sources.

  4. U.S. Offshore Wind Manufacturing and Supply Chain Development

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, Bruce [Navigant Consulting, Inc., Burlington, MA (United States)

    2013-02-22

    This report seeks to provide an organized, analytical approach to identifying and bounding uncertainties around offshore wind manufacturing and supply chain capabilities; projecting potential component-level supply chain needs under three demand scenarios; and identifying key supply chain challenges and opportunities facing the future U.S. market and current suppliers of the nation’s landbased wind market.

  5. Wind power installations in Switzerland - Regional planning basics and impact; Eoliennes en Suisse. Bases de planification pour l'amenagement du territoire et effets. Rapport de base

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  6. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  7. International wind energy development. World market update 2012. Forecast 2013-2017

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    areas, for operation in high altitudes or in cold climates. American, European and Indian manufacturers have pushed Chinese manufacturers out of the top five in 2012. Despite increasing its global market share by 1.1 percent in 2012, Vestas was displaced from the No. 1 position for the first time since claiming the top spot in 2000. Meanwhile, with a global market share of more than 15 percent in 2012, GE Wind ascended from the No. 3 to the No. 1 position, boosted by a rush to capitalize on the U.S. Production Tax Credit (PTC). For the second consecutive year, a reduction in market size is forecast for the upcoming 5-year period. The World Market Update 2012 forecasts that 241,620 MW will be added through 2017, 10 percent less than the forecast made in 2011. The lowering of the forecast growth rate is mainly due to a projected slowdown in wind turbine sales in 2013 and 2015. The average growth rate for new installations from 2013 to 2017 is expected to be 5.1 percent, with a decrease of more than 10 percent in 2013 compared to 2012. That decrease will be reflected in the U.S. market in 2013, as a result of 2012's last-minute one year extension of the federal production tax credit. The U.S. market will likely face additional political uncertainty when the PTC expires after 2013. Established European wind power markets, such as Spain and Italy, are expected to decline in coming years, while China, the world's largest wind market, will still be in transition from a period of breakneck growth to one of more stable development. Special Chapter on Cold Climate Turbines: As cold climate sites often provide favorable wind conditions, the deployment of wind energy in cold climate areas is growing rapidly. World Market Update 2012 reviews the challenges presented by cold climate, provides a geographical breakdown of cold climate wind turbine markets, analyzes the economics of cold climate technologies and projects, introduces the latest commercial applications developed

  8. Wind energy information guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This book is divided into nine chapters. Chapters 1--8 provide background and annotated references on wind energy research, development, and commercialization. Chapter 9 lists additional sources of printed information and relevant organizations. Four indices provide alphabetical access to authors, organizations, computer models and design tools, and subjects. A list of abbreviations and acronyms is also included. Chapter topics include: introduction; economics of using wind energy; wind energy resources; wind turbine design, development, and testing; applications; environmental issues of wind power; institutional issues; and wind energy systems development.

  9. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio

    Energy Technology Data Exchange (ETDEWEB)

    Oteri, F.; Sinclair, K.

    2011-11-01

    This paper provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  10. Differential recovery of habitat use by birds after wind farm installation: A multi-year comparison

    International Nuclear Information System (INIS)

    Farfán, M.A.; Duarte, J.; Real, R.; Muñoz, A.R.; Fa, J.E.; Vargas, J.M.

    2017-01-01

    Onshore wind farms remain one of the most widely used technologies for the production of renewable energy. These are known to affect birds through disturbance or collision. Most research focus on the impact of wind farms on raptors or other large bird species, especially those of conservation concern. However, limited information exists on the effect of wind farms on small birds. Recovery of large versus small bird populations impacted by wind farms is also largely unstudied. A reason for this is the lack of long-term datasets based on standardized, systematic assessments. We monitored birds in the vicinity of a wind farm in an upland habitat in southern Spain (Malaga province), immediately after installation and 6.5 years post-construction. During both study periods, we observed 11 raptor and 38 non-raptor species (including 30 passerines). We found differences in recovery rates between raptors and non-raptors. Raptors showed an upturn in numbers but non-raptor abundance fell significantly. Greater attention should be paid to the recovery of wildlife after initial impact assessments than at present. This study confirms that regulatory authorities and developers should consider the likely impacts of wind farms on small bird populations. Mitigation measures focused particularly on non-raptor species should be considered and implemented as a means to reduce these negative effects.

  11. Differential recovery of habitat use by birds after wind farm installation: A multi-year comparison

    Energy Technology Data Exchange (ETDEWEB)

    Farfán, M.A., E-mail: mafarfanaguilar@hotmail.com [Biogea Consultores, Calle Navarro Ledesma 243, Portal 4, 3° C, 29010, Málaga (Spain); Departamento de Biología Animal, Facultad de Ciencias, Universidad de Málaga, Campus de Teatinos, 29071, Málaga (Spain); Duarte, J., E-mail: jddofitecma@gmail.com [Departamento de Biología Animal, Facultad de Ciencias, Universidad de Málaga, Campus de Teatinos, 29071, Málaga (Spain); Ofitecma, Calle Colombia 5, 29400 Ronda, Málaga (Spain); Real, R. [Departamento de Biología Animal, Facultad de Ciencias, Universidad de Málaga, Campus de Teatinos, 29071, Málaga (Spain); Muñoz, A.R., E-mail: roman@uma.es [Departamento de Biología Animal, Facultad de Ciencias, Universidad de Málaga, Campus de Teatinos, 29071, Málaga (Spain); Departamento de Botànica, Facultad de Farmacia, Universidad de Valencia, Avda. Vicente Andrés Estellés s/n, Burjassot, Valencia (Spain); Fa, J.E., E-mail: jfa949@gmail.com [Division of Biology and Conservation Ecology, School of Science and the Environment, Manchester Metropolitan University, Manchester M1 5GD (United Kingdom); Vargas, J.M. [Departamento de Biología Animal, Facultad de Ciencias, Universidad de Málaga, Campus de Teatinos, 29071, Málaga (Spain)

    2017-05-15

    Onshore wind farms remain one of the most widely used technologies for the production of renewable energy. These are known to affect birds through disturbance or collision. Most research focus on the impact of wind farms on raptors or other large bird species, especially those of conservation concern. However, limited information exists on the effect of wind farms on small birds. Recovery of large versus small bird populations impacted by wind farms is also largely unstudied. A reason for this is the lack of long-term datasets based on standardized, systematic assessments. We monitored birds in the vicinity of a wind farm in an upland habitat in southern Spain (Malaga province), immediately after installation and 6.5 years post-construction. During both study periods, we observed 11 raptor and 38 non-raptor species (including 30 passerines). We found differences in recovery rates between raptors and non-raptors. Raptors showed an upturn in numbers but non-raptor abundance fell significantly. Greater attention should be paid to the recovery of wildlife after initial impact assessments than at present. This study confirms that regulatory authorities and developers should consider the likely impacts of wind farms on small bird populations. Mitigation measures focused particularly on non-raptor species should be considered and implemented as a means to reduce these negative effects.

  12. US-guided preoperative hook-wire localization of nonpalpable breast lesions

    International Nuclear Information System (INIS)

    Shin, Tae Beom; Lee, Sang Kwon; Kim, Hye Jung; Ryeom, Hun Kyu; Kim, Tae Hun; Kim, Yong Ju; Kang, Duk Sik; Lee, Young Ha; Park, Ho Yong

    2000-01-01

    To evaluate the feasibility and efficacy of US-guided preoperative wire localization of nonpalpable breast lesions. US-guided preoperative wire localization was performed upon 45 nonpalpable breast lesions including 14 nonpalpable masses, 11 nonpalpable masses with microcalcifications, 11 ductal lesions, 9 with microcalcifications. No local anesthesia was performed during the localization procedure. Under the US-guidance, the needle with the hook-wire was inserted into the lesion until the hook of the wire reached 1 cm beyond the posterior margin of the lesion. Precise wire positioning was confirmed by mammography. Specimen radiography or specimen ultrasonography was performed in all cases. US-guided preoperative wire localization was successfully achieved in all cases. The time required for US-guided wire localization was less than five minutes. All lesions were successfully removed by surgical excision. Successful removal was confirmed by specimen radiography or specimen ultrasonography, gross findings of the specimen and consistency between radiographic and pathologic findings. The histologic diagnosis of 45 lesions were 7 ductal carcinoma in situ, 8 invasive ductal carcinoma, 6 fibroadenoma, 8 intraductal papilloma, 2 atypical ductal hyperplasia, and 14 fibrocystic changes. No complications were occurred during and after the procedure. US-guided preoperative wire localization for excisional biopsy is simple, safe, and accurate method in the histologic diagnosis of nonpalpable breast lesions detectable with ultrasonography.

  13. US-guided preoperative hook-wire localization of nonpalpable breast lesions

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Tae Beom; Lee, Sang Kwon; Kim, Hye Jung; Ryeom, Hun Kyu; Kim, Tae Hun; Kim, Yong Ju; Kang, Duk Sik; Lee, Young Ha; Park, Ho Yong [Kyungpook National University College of Medicine, Taegu (Korea, Republic of)

    2000-12-15

    To evaluate the feasibility and efficacy of US-guided preoperative wire localization of nonpalpable breast lesions. US-guided preoperative wire localization was performed upon 45 nonpalpable breast lesions including 14 nonpalpable masses, 11 nonpalpable masses with microcalcifications, 11 ductal lesions, 9 with microcalcifications. No local anesthesia was performed during the localization procedure. Under the US-guidance, the needle with the hook-wire was inserted into the lesion until the hook of the wire reached 1 cm beyond the posterior margin of the lesion. Precise wire positioning was confirmed by mammography. Specimen radiography or specimen ultrasonography was performed in all cases. US-guided preoperative wire localization was successfully achieved in all cases. The time required for US-guided wire localization was less than five minutes. All lesions were successfully removed by surgical excision. Successful removal was confirmed by specimen radiography or specimen ultrasonography, gross findings of the specimen and consistency between radiographic and pathologic findings. The histologic diagnosis of 45 lesions were 7 ductal carcinoma in situ, 8 invasive ductal carcinoma, 6 fibroadenoma, 8 intraductal papilloma, 2 atypical ductal hyperplasia, and 14 fibrocystic changes. No complications were occurred during and after the procedure. US-guided preoperative wire localization for excisional biopsy is simple, safe, and accurate method in the histologic diagnosis of nonpalpable breast lesions detectable with ultrasonography.

  14. Wind power integration : From individual wind turbine to wind park as a power plant

    NARCIS (Netherlands)

    Zhou, Y.

    2009-01-01

    As power capacities of single wind turbine, single wind park and total wind power installation are continuously increasing, the wind power begins to challenge the safety operation of the power system. This thesis focuses on the grid integration aspects such as the dynamic behaviours of wind power

  15. Canadian Wind Energy Association small wind conference proceedings : small wind policy developments (turbines of 300 kW or less)

    International Nuclear Information System (INIS)

    2005-01-01

    The small wind session at the Canadian Wind Energy Association's (CanWEA) annual conference addressed policies affecting small wind, such as net metering, advanced renewable tariffs and interconnections. It also addressed CanWEA's efforts in promoting small wind turbines, particularly in remote northern communities, small businesses and within the residential sector. Small wind systems are typically installed in remote communities to offset utility supplied electricity at the retail price level. In certain circumstances, small wind and hybrid systems can produce electricity at less than half the cost of traditional electricity sources, which in remote communities is typically diesel generators. Small wind turbines require different materials and technologies than large wind turbines. They also involve different local installation requirements, different by-laws, tax treatment and environmental assessments. Small wind turbines are typically installed for a range of factors, including energy independence, energy price stability and to lower environmental impacts of traditional power generation. The small wind session at the conference featured 14 presentations, of which 4 have been catalogued separately for inclusion in this database. tabs., figs

  16. Small Wind Turbine Installation Compatibility Demonstration Methodology

    Science.gov (United States)

    2013-08-01

    wind turbine (HAWT) and one 2.9-kW vertical-axis wind turbine (VAWT), we planned to measure radar, acoustic and seismic, turbulence, bird and...non-issue for small turbines . The majority of studies of bat and bird interactions with wind turbines are for large turbines (BPA 2002; Whittam...et al. 2010). The majority of studies of bat and bird interactions with wind energy facil- ities are for utility-scale turbines (> 1 MW) with

  17. The Current State of Additive Manufacturing in Wind Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mann, Margaret [National Renewable Energy Lab. (NREL), Golden, CO (United States); Palmer, Sierra [Worcester Polytechnic Institute (WPI), , Worcester, MA (United States); Lee, Dominic [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurup, Parthiv [National Renewable Energy Lab. (NREL), Golden, CO (United States); Remo, Timothy [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jenne, Dale Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Richardson, Bradley S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Love, Lonnie J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Post, Brian K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    Wind power is an inexhaustible form of energy that is being captured throughout the U.S. to power the engine of our economy. A robust, domestic wind industry promises to increase U.S. industry growth and competitiveness, strengthen U.S. energy security independence, and promote domestic manufacturing nationwide. As of 2016, ~82GW of wind capacity had been installed, and wind power now provides more than 5.5% of the nation’s electricity and supports more than 100,000 domestic jobs, including 500 manufacturing facilities in 43 States. To reach the U.S. Department of Energy’s (DOE’s) 2015 Wind Vision study scenario of wind power serving 35% of the nation's end-use demand by 2050, significant advances are necessary in all areas of wind technologies and market. An area that can greatly impact the cost and rate of innovation in wind technologies is the use of advanced manufacturing, with one of the most promising areas being additive manufacturing (AM). Considering the tremendous promise offered by advanced manufacturing, it is the purpose of this report to identify the use of AM in the production and operation of wind energy systems. The report has been produced as a collaborative effort for the DOE Wind Energy Technology Office (WETO), between Oak Ridge National Laboratory (ORNL) and the National Renewable Energy Laboratory (NREL).

  18. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    Energy Technology Data Exchange (ETDEWEB)

    OShaughnessy, Eric J. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-16

    This study uses data on over 900,000 solar PV installations to summarize the evolving market structure of the U.S. residential solar PV installation industry. Over 8,000 companies have installed residential PV systems in the United States. The vast majority of these installers are small local companies. At the same time, a subset of national-scale high-volume PV installation companies hold high market shares. This study examines the factors behind these trends in market concentration, including the role of customer financing options.

  19. Advancing the Growth of the U.S. Wind Industry: Federal Incentives, Funding, and Partnership Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    2017-02-01

    The U.S. Department of Energy's (DOE's) Wind Energy Technologies Office (WETO) works to accelerate the development and deployment of wind power. The office provides information for researchers, developers, businesses, manufacturers, communities, and others seeking various types of federal assistance available for advancing wind projects. This fact sheet outlines the primary federal incentives for developing and investing in wind power, resources for funding wind power, and opportunities to partner with DOE and other federal agencies on efforts to move the U.S. wind industry forward.

  20. Resolution 8.069/12. It approve the regulations for the large size structures installation, destined for wind power generation

    International Nuclear Information System (INIS)

    2012-01-01

    This resolution approve the regulations for the large size structures installation, destined to wind power generation. The objective of this rule is to regulate the urban conditions of the facilities and the environmental guarantees, safety and inhabitants wholesomeness

  1. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  2. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L; Wiser, Ryan; Peterman, Carla; Darghouth, Naim

    2009-10-05

    Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of

  3. Wind Power Utilization Guide.

    Science.gov (United States)

    1981-09-01

    The expres- sions for the rotor torque for a Darrieus machine can be found in Reference 4.16. The Darrieus wind turbine offers the following... turbine generators, wind -driven turbines , power conditioning, wind power, energy conservation, windmills, economic ana \\sis. 20 ABS 1"ACT (Conti,on... turbines , power conditioning requirements, siting requirements, and the economics of wind power under different conditions. Three examples are given to

  4. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, K.; Oteri, F.

    2011-05-01

    This presentation provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  5. Suitability analysis of wind energy development on brownfields, landfills and industrial sites in the city of Chicago

    Science.gov (United States)

    Fyodorova, Valeryia A.

    In 2011 renewable energy generated only about 5% of total U.S. electricity and 3% came from wind power. Wind power is the oldest and fastest growing renewable energy, and U.S. Department of Energy (DOE) anticipates that by 2030 the potential of the U.S. to generate wind power will rise up to 20% (National Renewable Energy Laboratory 2008). Currently, the rural areas serve as the primary choice of wind turbine installation because there are less wind obstacles that create wind turbulence, which in turn is disruptive for the proper functioning of the wind turbines, and allows more laminar (streamline) wind flow. However according to various literatures, the installation of wind turbines in rural areas has its drawbacks. The infrastructure is underdeveloped and usually the selected sites require the construction of new roads and transmission lines. The new construction and occasional deforestation lead to soil erosion and environmental degradation. On top of that transporting energy to cities that are the primary consumers of wind energy results in energy transmission loss. Urban areas, on the other hand, have well developed infrastructure, and the installation of turbines on abandoned and contaminated urban lands which are expensive to clean and rehabilitate for other uses would lower installation costs and would have little environmental degradation effect. The objective of this research was to provide a preliminary wind power suitability analysis for installing medium (100 -1000 kW) and large (1000 - 3000 kW) size wind turbines in urban areas, such as city of Chicago. Geographic Information Systems (GIS) and a multi attribute Weighted Linear Combination (WLC) method that is based on the concept of weighted average were primary tools utilized to conduct the analysis. The criteria that were used to select suitable sites were the same criteria used for rural wind farms, such as wind speeds, historic landmarks, avian and wildlife habitat, conservation lands, proximity

  6. Multiple Lightning Discharges in Wind Turbines Associated with Nearby Cloud-to-Ground Lightning

    DEFF Research Database (Denmark)

    Candela Garolera, Anna; Cummins, Kenneth L.; Madsen, Søren Find

    2015-01-01

    This paper presents the analysis of five events where simultaneous lightning currents were registered in different wind turbines of a wind farm with lightning monitoring equipment installed. Measurements from current monitoring devices installed at the wind turbines and observations from auto......-triggering video cameras were correlated with data from the U.S. National Lighting Detection Network. In all five events, the correlation showed that a cloud-to-ground (CG) lightning stroke with high peak current struck the ground within 10 km of the affected turbines at the time of the currents in the wind...... by the nearby CG strokes, involving mechanisms that vary depending on the polarity of the associated CG stroke. The analysis also suggests that the event of upward lightning from wind turbines triggered by nearby lightning activity occurs very often and therefore it should be considered carefully...

  7. Wind energy barometer - EurObserv'ER - February 2016

    International Nuclear Information System (INIS)

    2016-02-01

    The spectacular rise of China's wind power market that resulted in connecting at least 30.5 GW, catapulted the global installation level to 62.7 GW in 2015- a 22% more than in 2014. The US and German markets also performed very well, the former because its tax credit mechanism remained in force and the latter because many of its offshore wind farms in the North Sea were connected to the grid. Global wind turbine capacity has increased by 17% and now stands at 432.6 GW

  8. Windpower 2000: The growing U.S. wind energy base

    International Nuclear Information System (INIS)

    Bergey, M.L.S.; Swisher, R.

    1994-01-01

    The American Wind Energy Association (AWEA) has set forth the following wind energy industry objectives for the year 2000: (1) to achieve 10,000 MW cumulative, grid-connected wind power capacity in the United States; (2) to build a $4 billion domestic wind industry base capable of delivering at least 3,000 MW of turbine production per year; (3) to create tens of thousands of new, long-term, skilled jobs, primarily in the manufacturing sector; (4) to achieve levelized costs below four cents per kWh and capital costs 30 percent lower than current costs; (5) to make wind power a major renewable energy option in achieving the nation's' global climate change objectives; (6) to make the US wind power industry the world's technology leader and lowest-cost supplier. This paper will describe the industry's progress toward meeting these goals by presenting the milestones that have been achieved over the last year. In addition, the paper will discuss the Association's strategy for addressing remaining obstacles and moving wind energy into the status of a generally accepted utility technology and one of the lowest cost providers of bulk power for the 21st century

  9. Wind power barometer

    International Nuclear Information System (INIS)

    Anon.

    2010-01-01

    The global wind power market not only repelled the strictures of the financial crisis, but saw the installation of 37 GW in 2009, which is almost 10 GW up on 2008. China and the United States registered particularly steady growth and the European Union also picked up momentum to break its installation record. A total capacity of 158 GW of wind power are now installed across the world from which 74.8 GW in the European Union. Among the European countries Denmark has the highest wind capacity per inhabitant in 2009: 627.5 kW/1000 inhabitants. Spain seeks to limit its market's growth in order to better manage the development of wind energy across the country. German growth is back, Italy chalks up a new record for installation and the French market is becoming increasingly regulated. United-Kingdom is developing offshore wind farms: the offshore capacity could reasonably rise to 20000 MW by 2020. The last part of the article reports some economical news from the leading players: Vestas, GE-Energy, Gamesa, Enercon, Sinovel and Siemens. (A.C.)

  10. A fair wind blows for one green technology

    International Nuclear Information System (INIS)

    Marshall, E.

    1993-01-01

    The newest windmills are small and robust, typically capable of generating 50 to 500 kilowatts each. Sales have been helped along, both in Europe and the United States, by laws requiring utility companies to offer fixed purchase-price contracts to suppliers of wind electricity. Another boost comes from the National Energy Policy Act, signed into law last fall by George Bush. It permits a 1.5 cent per kilowatt-hour tax credit for generators of electricity from renewable sources. Emphasizing energy production is open-quotes a much smarter approachclose quotes than just rewarding construction of new windmills, says Alexander Ellis, an executive at Kenetech/US Windpower, because it encourages companies to deliver durable products. Today, the wind energy business seems to be booming, bearing out the Administration's faith that environmental technologies can open new markets. There are now more than 16,000 wind turbines installed in the United States, according to DeMeo, most of them still in California. Europe is also moving ahead. Although European countries have installed fewer machines to date, DeMeo says, the European Community has ambitious plans, calling for double the current US wind energy capacity by the end of the decade. About 10 major manufacturers in the United States and abroad are vying for this business. It took some fine-tuning, but government incentives to nurture this green technology seem to be working

  11. RE-Powering’s Electronic Decision Tree

    Science.gov (United States)

    Developed by US EPA's RE-Powering America's Land Initiative, the RE-Powering Decision Trees tool guides interested parties through a process to screen sites for their suitability for solar photovoltaics or wind installations

  12. Progress and plans for wind energy in the United States

    International Nuclear Information System (INIS)

    Ancona, D.F.; Goldman, P.R.; Thresher, R.W.

    1996-01-01

    Under its wind energy research and development program, the U.S. Department of Energy (DOE) works as a partner with industry to improve understanding of wind system technology and to develop and deploy advanced wind turbines in multi-regional markets. Installed capacity in the U.S. reached 1770 MW by the end of 1995. However, this figure does not include some capacity that was retired or brought off line. Growth of about 140 MW during 1995, is attributed to improved and lower cost turbines and was stimulated in part by the availability of energy tax credits and production and financial incentives. In addition, there are nearly 500 MW of firm contracts for new domestic wind plants. Recently, there has been substantial growth in both Europe and the rest of the world, those countries other than Europe and the U.S. The U.S. DOE Wind Energy Systems Program is continuing broad based research and technology development focusing on advanced wind turbine development. Contracts have been placed with industry for next generation design studies, innovative subsystems applied research, and value engineering to improve existing turbines. Some of these turbines are now being deployed in utility verification projects. Over the past year, the U.S. opened its National Wind Technology Center, located near Golden, Colorado. The center will include a new user facility to serve as a wind turbine blade and system testing and research center for industry. (author)

  13. Guide of the environmental impact of the wind farms; Guide de l'etude d'impact sur l'environnement des parcs eoliens

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This guide provides a general approach and a methodology of implementing environmental evaluations of the wind farms: the regulatory framework of the impact study, the methodology of the study, the natural areas, landscape and heritage, noise and public health and the specific case of offshore wind turbines. (A.L.B.)

  14. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    Energy Technology Data Exchange (ETDEWEB)

    OShaughnessy, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-22

    Market structure refers to the number of firms and the distribution of market shares among firms within an industry. In The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016, we examine market structure in the context of residential solar PV. We find that over 8,000 companies have installed at least one residential PV system, with about 2,900 companies active in 2016. The majority of residential PV installers are relatively small companies, with about half of installers installing fewer than five systems. At the same time, a subset of high-volume installers accumulated market share, especially beginning around 2010 with the emergence of alternative customer financing options.

  15. In Brief: Impacts of wind energy assessed

    Science.gov (United States)

    Zielinski, Sarah

    2007-05-01

    By 2020, greater use of wind energy could reduce carbon dioxide emissions by the U.S. energy sector by about 4.5%. However, greater effort is needed to address potentially negative impacts of this growing energy source, according to a new report from a committee of the U.S. National Research Council. Potential impacts of wind energy projects include deaths of birds and bats, reduced value of property located near a turbine, and habitat loss and fragmentation. However, because these are generally local projects, there is little information available to determine the cumulative effects of wind turbines over a whole region. The report makes several recommendations on how to improve regulation at the local, state, and federal levels. The report also sets out a guide for evaluating wind-energy projects, which includes questions about potential environmental, economic, cultural, and aesthetic impacts. The report, ``Environmental Impacts of Wind-Energy Projects,'' is available at http://books.nap.edu/catalog.php?record_id=11935

  16. Mill of wind tropical Gulls double effect: installation Manual, handling and maintenance of the mill of wind MV2E

    International Nuclear Information System (INIS)

    2001-01-01

    This manual gives the basic indications that are required for the installation, handling and maintenance of the mill of tropical wind. With the purpose of that the manual is accessible at the different levels of understanding that are presented in the population that lives in the rural means, the text has three levels: The first level is photographic, directed to sectors illiterates. The second is a flowing conversation among people and the image, in order to be adapted to minima education levels. Lastly the third level, they constitute the planning and charts elaborated by hand that give excellent but not indispensable information

  17. Wind power; Le grand livre de l'eolien

    Energy Technology Data Exchange (ETDEWEB)

    Gipe, P

    2007-07-01

    This book is a translation of the edition published in the USA under the title of ''wind power: renewable energy for home, farm and business''. In the wake of mass blackouts and energy crises, wind power remains a largely untapped resource of renewable energy. It is a booming worldwide industry whose technology, under the collective wing of aficionados like author Paul Gipe, is coming of age. Wind Power guides us through the emergent, sometimes daunting discourse on wind technology, giving frank explanations of how to use wind technology wisely and sound advice on how to avoid common mistakes. Since the mid-1970's, Paul Gipe has played a part in nearly every aspect of wind energy development from installing small turbines to promoting wind energy worldwide. As an American proponent of renewable energy, Gipe has earned the acclaim and respect of European energy specialists for years, but his arguments have often fallen on deaf ears at home. Today, the topic of wind power is cropping up everywhere from the beaches of Cape Cod to the Oregon-Washington border, and one wind turbine is capable of producing enough electricity per year to run 200 average American households. Now, Paul Gipe is back to shed light on this increasingly important energy source with a revised edition of Wind Power. Over the course of his career, Paul Gipe has been a proponent, participant, observer, and critic of the wind industry. His experience with wind has given rise to two previous books on the subject, Wind Energy Basics and Wind Power for Home and Business, which have sold over 50,000 copies. Wind Power for Home and Business has become a staple for both homeowners and professionals interested in the subject, and now, with energy prices soaring, interest in wind power is hitting an all-time high. With chapters on output and economics, Wind Power discloses how much you can expect from each method of wind technology, both in terms of energy and financial savings. The

  18. Vertically and Horizontally Mounted Wind Mills : Wind Energy Production in Tampere University of Applied Sciences

    OpenAIRE

    Evdokimova, Ekaterina

    2013-01-01

    The purpose of this thesis was to gather information about vertical and horizontal wind mills and to complete a research on wind power production by wind mills which were installed in Tampere University of Applied Sciences. The horizontally mounted wind mill Windspot 3.5 and vertically mounted wind mill Cypress were installed in summer 2011 but they started functioning and supplying energy only during 2012. In the theoretical part of this thesis wind speed and wind power production is dis...

  19. Quadrennial Technology Review 2015: Technology Assessments--Wind Power

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-10-07

    Wind power has become a mainstream power source in the U.S. electricity portfolio, supplying 4.9% of the nation’s electricity demand in 2014. With more than 65 GW installed across 39 states at the end of 2014, utility-scale wind power is a cost-effective source of low-emissions power generation throughout much of the nation. The United States has significant sustainable land-based and offshore wind resource potential, greater than 10 times current total U.S. electricity consumption. A technical wind resource assessment conducted by the Department of Energy (DOE) in 2009 estimated that the land-based wind energy potential for the contiguous United States is equivalent to 10,500 GW capacity at 80 meters (m) hub and 12,000 GW capacity at 100 meters (m) hub heights, assuming a capacity factor of at least 30%. A subsequent 2010 DOE report estimated the technical offshore wind energy potential to be 4,150 GW. The estimate was calculated from the total offshore area within 50 nautical miles of shore in areas where average annual wind speeds are at least 7 m per second at a hub height of 90 m.

  20. Installation for vacuum vapour deposition of nickel, more particularly for manufacturing neutron guides

    International Nuclear Information System (INIS)

    Samuel, F.

    1986-01-01

    The present invention proposes an installation for vacuum vapour deposition of Ni of the type including in a vacuum chamber a device for heating a mass of at least one Ni isotope to be evaporated, and a surface to be covered with deposited Ni facing the heater, is claimed, in which the heater includes a ribbon of W conformed in a middle part into a container in which is placed a refractory crucible in which is placed the Ni to be evaporated, and adapted to be connected at two terminal zones to an electrical circuit. The crucible is Al203. The invention finds an application in neutron guide fabrication, more particularly for Ni58 vapour deposition on the surfaces of the neutron guide [fr

  1. Offshore wind farm Bockstigen - installation and operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Lange, B [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark); Aagaard, E; Andersen, P E; Moeller, A [Wind World af 1997 A/S, Noerresundby (Denmark); Niklasson, S; Wickman, A [Vindkompaniet, Degerhamn (Sweden)

    1999-03-01

    The first Swedish offshore wind farm Bockstigen is operating since March 1998 near the coast of Gotland. It was built as a demonstration project by the Swedish wind farm developer Vindkompaniet, the Danish wind turbine manufacturer Wind World and the British offshore construction company Seacore and partly funded under the EU-THERMIE program. Bockstigen is the fourth offshore wind farm world-wide. While at previous wind farms the main emphasis laid on the demonstration of the technical feasibility of offshore wind energy utilisation, Bockstigen was aimed at demonstrating its economic viability. A number of innovative concepts have been employed: Drilled monopile foundations were used to save costs. A new construction method has been applied making use of a jack-up barge. A new control system for the turbines and the whole wind farm was developed, which controls the maximum power output, the flicker and the reactive power consumption depending on online measurements of the actual grid state. These new developments have been implemented successfully. A substantial cost reduction compared to previous offshore projects could be achieved. (au)

  2. Statistical downscaling of IPCC sea surface wind and wind energy predictions for U.S. east coastal ocean, Gulf of Mexico and Caribbean Sea

    Science.gov (United States)

    Yao, Zhigang; Xue, Zuo; He, Ruoying; Bao, Xianwen; Song, Jun

    2016-08-01

    A multivariate statistical downscaling method is developed to produce regional, high-resolution, coastal surface wind fields based on the IPCC global model predictions for the U.S. east coastal ocean, the Gulf of Mexico (GOM), and the Caribbean Sea. The statistical relationship is built upon linear regressions between the empirical orthogonal function (EOF) spaces of a cross- calibrated, multi-platform, multi-instrument ocean surface wind velocity dataset (predictand) and the global NCEP wind reanalysis (predictor) over a 10 year period from 2000 to 2009. The statistical relationship is validated before applications and its effectiveness is confirmed by the good agreement between downscaled wind fields based on the NCEP reanalysis and in-situ surface wind measured at 16 National Data Buoy Center (NDBC) buoys in the U.S. east coastal ocean and the GOM during 1992-1999. The predictand-predictor relationship is applied to IPCC GFDL model output (2.0°×2.5°) of downscaled coastal wind at 0.25°×0.25° resolution. The temporal and spatial variability of future predicted wind speeds and wind energy potential over the study region are further quantified. It is shown that wind speed and power would significantly be reduced in the high CO2 climate scenario offshore of the mid-Atlantic and northeast U.S., with the speed falling to one quarter of its original value.

  3. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan; Barbose, Galen; Peterman, Carla

    2009-02-11

    As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76percent of all grid-connected PV capacity installed in the U.S. through 2007.

  4. Landscape integration and harmonization assessment guide : wind farm siting project on public land

    Energy Technology Data Exchange (ETDEWEB)

    Bouchard, M.A.; Boudart, M.; Arsenault, M.; Lauzon, M.; Lizotte, C.; Munoz, P.; Poirier, C.; Guimont, C.; Sainte-Marie, L.

    2005-07-01

    The development of a wind farm industry depends greatly on obtaining land use rights. This paper describes a program created by the Quebec Government to make public land available for wind farm construction. In particular, the program allows the government to set aside public land to promote the development of the wind industry in the Gaspe Region and the Matane Regional County Municipality. It also awards land rights for wind farm construction to bidders who have signed wind energy sales contracts with Hydro-Quebec Distribution. The program allows the government to set lease rates for public land used for wind farms based on market rates. This document is a guide used by Quebec's Ministry of Natural Resources to evaluate projects and issue leases for parcels of public land to be used for wind turbine arrays. It identifies major landscape issues associated with wind farms and allows proponents to demonstrate the natural and anthropogenic impacts of a wind farm on the landscape and present mitigative measures to minimize these impacts. This document also identifies the wind farm landscape integration and harmonization principles for public lands in Quebec. It was noted that wind farm projects with 10 MW capacity or less are not subject to guidelines established by the Quebec Ministry of Sustainable Development, Environment and Parks. 23 refs., 2 tabs.

  5. International wind energy development. World market update 2001. Forecast 2002-2006

    International Nuclear Information System (INIS)

    2002-03-01

    In the year 2001, the wind power development took another major step forward. Installed capacity set a new record with the addition of 6,824 MW of new generating capacity. This is 2,329 MW more than the record set in year 2000. Growth in new capacity is up from 15% in year 2000 to 52% in 2001. This confirmed that the trend of wind energy being the preferred technology over other technologies for new generating capacity is continuing. Europe is the leading region for wind power. Of the new capacity added in 2001, 4,527 MW was installed in Europe. Germany once more shows this country's potential as the single most active market with the installation of 2,627 MW in new capacity, nearly 1,000 MW more than in the previous year. Germany consolidated its position as the world's leading developer of wind energy. The market in the US is once again the second largest wind energy market ahead of Spain. The expiration of the PTC at the end of the year 2001 gave some rush in the installation at the end of the year. The Danish market is on a deroute and lost pace completely in a changed political climate which means that the development of windpower is slowing down. Denmark has a very high penetration of windpower. On the supplier side Vestas Wind Systems A/S maintained its position as being the world's largest manufacturer of wind turbines. Vestas Wind Systems is now followed by Enercon GmbH. Without counting the US market figures Vestas Wind Systems A/S and Enercon has become the very closed in terms of sold MW. In the 3rd place is the Danish company NEG Micon A/S. Newcomers in the Top Ten list are Mitsubishi (JP) and REpower (GE). The most significant technological trend in the market is the continuing upscaling of machines. From year 2001 the average size of WTGs is 915 kW (in 2000: 800kW). In the very near future there will be erected wind turbines mainly dedicated for the upcoming offshore market of 4.5-5.0 MW. On Offshore there is only 10 MW installed during the year 2001

  6. Save with Solar and Wind, Summer 2002 (Newsletter)

    Energy Technology Data Exchange (ETDEWEB)

    2002-07-01

    This newsletter is published by the Department of Energy's Federal Energy Management Program. It is intended for facility managers, contracting officials, energy specialists, and others involved in helping Federal agencies increase their use of cost-effective solar and wind energy systems at their facilities. Renewable energy systems ultimately save agencies money by reducing utility costs; they also help to lower the emissions associated with the use of fossil fuels. This issue describes a new strategy to achieve the Federal goal for renewable energy, as well as some new solar and wind systems installed at facilities of the Department of Defense, the U.S. Geological Survey, the U.S. Postal Service, the National Park Service, and other agencies.

  7. 20% Wind Energy by 2030: Increasing Wind Energy's Contribution to U.S. Electricity Supply; Executive Summary (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    2008-12-01

    This document is a 21-page summary of the 200+ page analysis that explores one clearly defined scenario for providing 20% of our nation's electricity demand with wind energy by 2030 and contrasts it to a scenario of no new U.S. wind power capacity.

  8. Wind Energy in the Backyard of our House?! Environmental Perception of Social and Environmental Impacts in the Installation and Operation of a Plant in the Community of the Site in Cumbe Aracati-CE

    Directory of Open Access Journals (Sweden)

    Roseilda Nunes Moreira

    2013-06-01

    Full Text Available This theoretical and empirical study aimed to understand the perception that local people have about the environmental impacts caused by the installation and operation of an eolic enterprise in the surrounding community. The study of environmental perception is crucial for us to better understand the interrelationships between man and the environment, expectations, desires, satisfactions and dissatisfactions, judgments and behaviors. The spatial area adopted for the study is the community of Cumbe in Aracati / CE for its geomorphologic and climatologic presented sufficient conditions for the installation and use of wind energy in order to change the energy matrix of the municipality. This research is exploratory and descriptive design literature and case study, where to collect the data were collected through interviews with open questions to a group of residents near the eolic enterprise investigated and a prosecutor's Aracati. In the field research, we investigated the environmental impacts caused by the eolic plant, the level of understanding in the community about wind energy and the enterprise's contribution to community development, among other issues.

  9. Wind Powering America Anemometer Loan Program: A Retrospective

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, T.

    2013-05-01

    This white paper details the history, mechanics, status, and impact of the Native American Anemometer Loan Program (ALP) conducted by the U.S. Department of Energy's Wind Powering America (WPA) initiative. Originally conceived in 2000 and terminated (as a WPA activity) at the end of FY 2011, the ALP has resulted in the installation of anemometers at 90 locations. In addition, the ALP provided support for the installation of anemometers at 38 additional locations under a related ALP administered by the Western Area Power Administration.

  10. Wind power in France

    International Nuclear Information System (INIS)

    Tuille, F.; Courtel, J.

    2015-01-01

    After 3 years of steady decreasing, wind power has resumed growth in 2014 in France and the preliminary figures of 2015 confirm this trend. About 1100 MW were installed in 2014 which was almost twice as much as it was installed the year before. This renaissance is mostly due to the implementation of Brottes' law that eases the installations of wind farms by suppressing the wind power development areas (that were interfering with regional wind power schemes) and by suppressing the minimum number of 5 turbines for any new wind farms. Another important incentive measure was the announcement in January 2015 of a new financial support scheme in replacement of the policy of guaranteed purchase price for the electricity produced. In 2014 the total wind power produced in mainland France reached 17 TW which represented 3.1% of the production of electricity. (A.C.)

  11. U.S. Arctic Voyage Planning Guide (AVPG)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Arctic Voyage Planning Guide is a compilation of official U.S. Government information and references to sources of information that may be consulted by mariners...

  12. Review of wind power tariff policies in China

    International Nuclear Information System (INIS)

    Hu, Zheng; Wang, Jianhui; Byrne, John; Kurdgelashvili, Lado

    2013-01-01

    In the past 20 years, China has paid significant attention to wind power. Onshore wind power in China has experienced tremendous growth since 2005, and offshore wind power development has been on-going since 2009. In 2010, with a total installed wind power capacity of 41.8 GW, China surpassed the U.S. as the country with the biggest wind power capacity in the world. By comparing the wind power situations of three typical countries, Germany, Spain, and Denmark, this paper provides a comprehensive evaluation and insights into the prospects of China’s wind power development. The analysis is carried out in four aspects including technology, wind resources, administration and time/space frame. We conclude that both German and Spanish have been growing rapidly in onshore capacity since policy improvements were made. In Denmark, large financial subsidies flow to foreign markets with power exports, creating inverse cost-benefit ratios. Incentives are in place for German and Danish offshore wind power, while China will have to remove institutional barriers to enable a leap in wind power development. In China, cross-subsidies are provided from thermal power (coal-fired power generation) in order to limit thermal power while encouraging wind power. However, the mass installation of wind power capacity completely relies on power subsidies. Furthermore, our study illustrates that capacity growth should not be the only consideration for wind power development. It is more important to do a comprehensive evaluation of multi-sectorial efforts in order to achieve long-term development. - Highlights: ► Key components to exam China’s wind power. ► Evaluation of Europe could be helpful. ► China has to remove institutional barrier.

  13. Analysis of the Environmental Impact on Remanufacturing Wind Turbines

    Science.gov (United States)

    Sosa Skrainka, Manuel R.

    To deliver clean energy the use of wind turbines is essential. In June 2011 there was an installed wind capacity equivalent to 211,000MW world-wide (WWEA, 2011). By the end of the year 2009 the U.S. had 35,100MW of wind energy installed capacity to generate electricity (AWEA, 2010). This industry has grown in recent years and is expected to grow even more in the future. The environmental impacts that will arise from the increased number of wind turbines and their end-of-life should be addressed, as large amounts of resources will be required to satisfy the current and future market demands for wind turbines. Since future 10MW wind turbines are expected to be as heavy as 1000 tons each, the study of the environmental response of profitable retirement strategies, such as remanufacturing for these machines, must be considered. Because of the increased number of wind turbines and the materials used, this study provides a comparison between the environmental impacts from remanufacturing the components installed inside the nacelle of multi-megawatt wind turbines and wind turbines manufactured using new components. The study methodology is the following: • Describe the life-cycle and the materials and processes employed for the manufacture and remanufacturing for components inside the nacelle. • Identify remanufacturing alternatives for the components inside the nacelle at the end of the expected life-time service of wind turbines. • Evaluate the environmental impacts from the remanufactured components and compare the results with the impacts of the manufacturing of new components using SimaPro. • Conduct sensitivity analysis over the critical parameters of the life cycle assessment • Propose the most environmentally friendly options for the retirement of each major component of wind turbines. After an analysis of the scenarios the goal of the study is to evaluate remanufacturing as an end-of-life option from an environmental perspective for commercial multi

  14. 2015 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Electricity Markets and Policy Group; Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Electricity Markets and Policy Group; Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoen, Ben [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rand, Joe [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Porter, Kevin [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-08-03

    Annual wind power capacity additions in the United States surged in 2015 and are projected to continue at a rapid clip in the coming five years. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—having been extended for several years (though with a phase-down schedule, described further on pages 68-69), as well as a myriad of state-level policies. Wind additions are also being driven by improvements in the cost and performance of wind power technologies, yielding low power sales prices for utility, corporate, and other purchasers. At the same time, the prospects for growth beyond the current PTC cycle remain uncertain: growth could be blunted by declining federal tax support, expectations for low natural gas prices, and modest electricity demand growth. This annual report—now in its tenth year—provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation-related trends: trends in U.S. wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development; and the quantity of proposed wind power capacity in various interconnection queues in the United States. Next, the report covers an array of wind power industry trends: developments in turbine manufacturer market share; manufacturing and supply-chain developments; wind turbine and component imports into and exports from the United States; project financing developments; and trends among wind power project owners and power purchasers. The report then turns to a summary of wind turbine technology trends: turbine size, hub height, rotor diameter, specific power, and IEC Class. After that, the report discusses wind power performance, cost, and pricing trends. In so doing, it describes

  15. Current status of wind energy and wind energy policy in Turkey

    International Nuclear Information System (INIS)

    Yaniktepe, B.; Savrun, M.M.; Koroglu, T.

    2013-01-01

    Highlights: • Present installations of wind power in the world. • Focus on the current state, potential, and development of Turkey’s wind energy. • Explain the institutional framework and support/incentive mechanisms in Turkey. • Investigate and give information about the new Turkish Renewable Energy Law. - Abstract: Over the past decades, the importance of renewable and sustainable energy resources has increased in the world due to both the rapid increase in energy demand and disadvantages of the fossil fuels. Many countries, such as Turkey, aim to increase the use of renewable and sustainable energy sources with different incentive mechanisms. In parallel with these incentive methods being implemented, wind energy capacity in Turkey has a remarkable increase in the growing rates of renewable energy sources according to installed wind power. Up to now, several wind power projects have been developed at different regions of Turkey. This paper aims to analyze the potential and development of wind energy systems in Turkey. Besides, the current usage and development of wind power installations have been explored for the World and Turkey in detail at the end of the 2011. Furthermore, this study also presents tax exemption, support, and incentive mechanisms to develop new wind energy investments in Turkey

  16. Monthly Wind Characteristics and Wind Energy in Rwanda

    African Journals Online (AJOL)

    user

    Abstract. Evaluating wind power potential for a site is indispensable before making any decision for the installation of wind energy infrastructures and planning for relating projects. This paper presents a branch of a composite analysis whose objective was to investigate the potential of wind energy resource in Rwanda.

  17. Guide for effluent radiological measurements at DOE installations

    International Nuclear Information System (INIS)

    Corley, J.P.; Corbit, C.D.

    1983-07-01

    Effluent monitoring and reporting programs are maintained at all US Department of Energy (DOE) facilities that may: (1) discharge significant concentrations of radioactivity in relation to applicable standards, or (2) discharge quantities of radioactivity that have potential health and safety or other environmental significance. This Guide is intended to provide supplemental guidance to DOE Orders on methods, procedures, and performance criteria to bring more comparable rationale to DOE facility effluent measurement programs and promote compliance with applicable standards and provide the DOE Office of Operational Safety (OOS) and Operations Offices with an additional tool for evaluating effluent measurement programs at DOE facilities

  18. Efficacy of US-guided Hydrostatic Reduction in Children with Intussusception

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Min; Chung, Tae Woong; Yoon, Woong; Chang, Nam Kyu; Heo, Suk Hee; Shin, Sang Soo; Lim, Hyo Sun; Jeong, Yong Yeon; Kang, Heoung Keun [Chonnam National University Hospital, Gwangju (Korea, Republic of)

    2007-09-15

    To assess the success rate and efficacy of US-guided hydrostatic reduction in children with intussusception. We retrospectively evaluated the ultrasonographic findings and clinical features of 121 children (M:F=80:41, mean age= 18 months) who underwent US-guided hydrostatic reduction between November, 2002 and February, 2007 for the diagnosis and treatment of intussusception. The 121 patients underwent 147 procedures, including recurred cases. Successful reduction was achieved in 132 cases (89.8% success rate), as confirmed by post-procedure ultrasonography and clinical findings. Emergency operations were performed in the 10 (6.8%) cases of irreducible intussusceptions, 8 of ileocolic type and 2 of ileoileal type. Perforation occurred in 4 cases (2.7%), and seizure in 1 case during the procedure (0.7%). US-guided hydrostatic reduction is a safe and effective tool for the diagnosis and treatment of pediatric intussusception

  19. Status of the French wind energy fleet - December 2010

    International Nuclear Information System (INIS)

    2010-12-01

    Maps, tables and graphs indicate the installed wind energy power in France at 1 October 2010, the evolution of the installed power and number of wind turbines, the distribution of installed power at the region and district levels, wind energy production in October 2010, and market shares of wind turbine manufacturers in France

  20. Probabilistic scheduling of offshore operations using copula based environmental time series : An application for cable installation management for offshore wind farms

    NARCIS (Netherlands)

    Leontaris, G.; Morales Napoles, O.; Wolfert, A.R.M.

    2016-01-01

    There are numerous uncertainties that impact offshore operations. However, environmental uncertainties concerning variables such as wave height and wind speed are crucial because these may affect installation and maintenance operations with potential delays and financial consequences. In order to

  1. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  2. Global wind power development: Economics and policies

    International Nuclear Information System (INIS)

    Timilsina, Govinda R.; Cornelis van Kooten, G.; Narbel, Patrick A.

    2013-01-01

    Existing literature indicates that theoretically, the earth's wind energy supply potential significantly exceeds global energy demand. Yet, only 2–3% of global electricity demand is currently derived from wind power despite 27% annual growth in wind generating capacity over the last 17 years. More than 95% of total current wind power capacity is installed in the developed countries plus China and India. Our analysis shows that the economic competitiveness of wind power varies at wider range across countries or locations. A climate change damage cost of US$20/tCO 2 imposed to fossil fuels would make onshore wind competitive to all fossil fuels for power generation; however, the same would not happen to offshore wind, with few exceptions, even if the damage cost is increased to US$100/tCO 2 . To overcome a large number of technical, financial, institutional, market and other barriers to wind power, many countries have employed various policy instruments, including capital subsidies, tax incentives, tradable energy certificates, feed-in tariffs, grid access guarantees and mandatory standards. Besides, climate change mitigation policies, such as the Clean Development Mechanism, have played a pivotal role in promoting wind power. Despite these policies, intermittency, the main technical constraint, could remain as the major challenge to the future growth of wind power. - Highlights: • Global wind energy potential is enormous, yet the wind energy contribution is very small. • Existing policies are boosting development of wind power. • Costs of wind energy are higher than cost of fossil-based energies. • Reasonable premiums for climate change mitigation substantially promote wind power. • Intermittency is the key challenge to future development of wind power

  3. Breezing ahead: the Spanish wind energy market

    International Nuclear Information System (INIS)

    Avia Aranda, Felix; Cruz, I.C.

    2000-01-01

    This article traces the rapid increase in Spain's wind generating capacity, and examines Spain's wind strategy, the assessment of wind power potential at regional level, and the guaranteeing of the market price for power generators using wind energy with yearly reviews of the price of electricity from wind power. Prices payable for electricity generated from renewable sources are listed, and the regional distribution of wind energy production is illustrated. Recent wind power installations in Spain, target levels for wind energy installations, wind farms larger than 1MW installed in 1999, and the impact of the growth of the wind energy market on the manufacturing industry and the manufacturers are discussed. Details of the wind energy capacity in the provinces of Navarra and Galicia are given, and plans for wind energy projects in the New National Plan for Scientific research, Development and Technological innovation (2000-2003) are considered

  4. Cost optimization of wind turbines for large-scale offshore wind farms

    International Nuclear Information System (INIS)

    Fuglsang, P.; Thomsen, K.

    1998-02-01

    This report contains a preliminary investigation of site specific design of off-shore wind turbines for a large off-shore wind farm project at Roedsand that is currently being proposed by ELKRAFT/SEAS. The results were found using a design tool for wind turbines that involve numerical optimization and aeroelastic calculations of response. The wind climate was modeled in detail and a cost function was used to estimate costs from manufacture and installation. Cost of energy is higher for off-shore installations. A comparison of an off-shore wind farm site with a typical stand alone on-shore site showed an increase of the annual production of 28% due to the difference in wind climate. Extreme loads and blade fatigue loads were nearly identical, however,fatigue loads on other main components increased significantly. Optimizations were carried out to find the optimum overall off-shore wind turbine design. A wind turbine for the off-shore wind farm should be different compared with a stand-alone on-shore wind turbine. The overall design changed were increased swept area and rated power combined with reduced rotor speed and tower height. Cost was reduced by 12% for the final 5D/14D off-shore wind turbine from 0.306 DKr/kWh to 0.270 DKr/kWh. These figures include capital costs from manufacture and installation but not on-going costs from maintenance. These results make off-shore wind farms more competitive and comparable to the reference on-shore stand-alone wind turbine. A corresponding reduction of cost of energy could not be found for the stand alone on-shore wind turbine. Furthermore the fatigue loads on wind turbines in on-shore wind farms will increase and cost of energy will increase in favor of off-shore wind farms. (au) EFP-95; EU-JOULE-3; 21 tabs., 7 ills., 8 refs

  5. U.S. Department of Energy Regional Resource Centers Report: State of the Wind Industry in the Regions

    Energy Technology Data Exchange (ETDEWEB)

    Baranowski, Ruth [National Renewable Energy Lab. (NREL), Golden, CO (United St; Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United St; Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United St; Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United St

    2016-03-01

    The wind industry and the U.S. Department of Energy (DOE) are addressing technical challenges to increasing wind energy's contribution to the national grid (such as reducing turbine costs and increasing energy production and reliability), and they recognize that public acceptance issues can be challenges for wind energy deployment. Wind project development decisions are best made using unbiased information about the benefits and impacts of wind energy. In 2014, DOE established six wind Regional Resource Centers (RRCs) to provide information about wind energy, focusing on regional qualities. This document summarizes the status and drivers for U.S. wind energy development on regional and state levels. It is intended to be a companion to DOE's 2014 Distributed Wind Market Report, 2014 Wind Technologies Market Report, and 2014 Offshore Wind Market and Economic Analysis that provide assessments of the national wind markets for each of these technologies.

  6. Wind Vision. A New Era for Wind Power in the United States (Executive Summary, Full Report, and Appendices); U.S. Department of Energy (DOE), NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-03-02

    The Wind Vision analysis demonstrates the economic value that wind power can bring to the nation, a value exceeding the costs of deployment. Wind’s environmental benefits can address key societal challenges such as climate change, air quality and public health, and water scarcity. Wind deployment can provide U.S. jobs, U.S. manufacturing, and lease and tax revenues in local communities to strengthen and support a transition of the nation’s electricity sector towards a low-carbon U.S. economy. The path needed to achieve 10% wind by 2020, 20% by 2030, and 35% by 2050 requires new tools, priorities, and emphases beyond those forged by the wind industry in growing to 4.5% of current U.S. electricity demand. Consideration of new strategies and updated priorities as identified in the Wind Vision could provide substantial positive outcomes for future generations.

  7. Wind tower service lift

    Science.gov (United States)

    Oliphant, David; Quilter, Jared; Andersen, Todd; Conroy, Thomas

    2011-09-13

    An apparatus used for maintaining a wind tower structure wherein the wind tower structure may have a plurality of legs and may be configured to support a wind turbine above the ground in a better position to interface with winds. The lift structure may be configured for carrying objects and have a guide system and drive system for mechanically communicating with a primary cable, rail or other first elongate member attached to the wind tower structure. The drive system and guide system may transmit forces that move the lift relative to the cable and thereby relative to the wind tower structure. A control interface may be included for controlling the amount and direction of the power into the guide system and drive system thereby causing the guide system and drive system to move the lift relative to said first elongate member such that said lift moves relative to said wind tower structure.

  8. Dependence of US hurricane economic loss on maximum wind speed and storm size

    International Nuclear Information System (INIS)

    Zhai, Alice R; Jiang, Jonathan H

    2014-01-01

    Many empirical hurricane economic loss models consider only wind speed and neglect storm size. These models may be inadequate in accurately predicting the losses of super-sized storms, such as Hurricane Sandy in 2012. In this study, we examined the dependences of normalized US hurricane loss on both wind speed and storm size for 73 tropical cyclones that made landfall in the US from 1988 through 2012. A multi-variate least squares regression is used to construct a hurricane loss model using both wind speed and size as predictors. Using maximum wind speed and size together captures more variance of losses than using wind speed or size alone. It is found that normalized hurricane loss (L) approximately follows a power law relation with maximum wind speed (V max ) and size (R), L = 10 c V max a R b , with c determining an overall scaling factor and the exponents a and b generally ranging between 4–12 and 2–4 respectively. Both a and b tend to increase with stronger wind speed. Hurricane Sandy’s size was about three times of the average size of all hurricanes analyzed. Based on the bi-variate regression model that explains the most variance for hurricanes, Hurricane Sandy’s loss would be approximately 20 times smaller if its size were of the average size with maximum wind speed unchanged. It is important to revise conventional empirical hurricane loss models that are only dependent on maximum wind speed to include both maximum wind speed and size as predictors. (letters)

  9. U.S. Department of Energy Solar Decathlon Visitors Guide 2015

    Energy Technology Data Exchange (ETDEWEB)

    2015-09-03

    The U.S. Department of Energy 2015 Visitors Guide is a free, hard-copy publication distributed free to those attending the Solar Decathlon event. The publications' objectives are to serve as the primary information resource for those in attendance, and to deliver a compelling message about the Solar Decathlon's success as a proven workforce development program and its role in educating students and the public about clean energy products and design solutions. The U.S. Department of Energy 2015 Visitors Guide SD15 Visitors Guide goals are to guide attendees through the Solar Decathlon village; List and explain the 10 contests; educate attendees about the participating teams and their competition houses; provide access to more information on the Solar Decathlon website through the use of QR codes; and acknowledge the support of all event sponsors.

  10. Use and regulatory control of dental X-ray installations

    International Nuclear Information System (INIS)

    1999-01-01

    In the guide the safety requirements concerning dental X-ray installations and their use, prerequisities for exemption from a safety licence, and regulatory control are presented. The guide applies to conventional dental X-ray installations, by which an image is created on an X-ray film or other image receptor placed inside the mouth, and panorama tomography installations for dentition and the cephalostats associated with these. The guide does not apply to multitechnique tomography installations intended for the special imaging of the skull or jaws

  11. The impact of Production Tax Credits on the profitable production of electricity from wind in the U.S

    International Nuclear Information System (INIS)

    Xi Lu; Tchou, Jeremy; McElroy, Michael B.; Nielsen, Chris P.

    2011-01-01

    A spatial financial model using wind data derived from assimilated meteorological condition was developed to investigate the profitability and competitiveness of onshore wind power in the contiguous U.S. It considers not only the resulting estimated capacity factors for hypothetical wind farms but also the geographically differentiated costs of local grid connection. The levelized cost of wind-generated electricity for the contiguous U.S. is evaluated assuming subsidy levels from the Production Tax Credit (PTC) varying from 0 to 4 cents /kWh under three cost scenarios: a reference case, a high cost case, and a low cost case. The analysis indicates that in the reference scenario, current PTC subsidies of 2.1 cents /kWh are at a critical level in determining the competitiveness of wind-generated electricity compared to conventional power generation in local power market. Results from this study suggest that the potential for profitable wind power with the current PTC subsidy amounts to more than seven times existing demand for electricity in the entire U.S. Understanding the challenges involved in scaling up wind energy requires further study of the external costs associated with improvement of the backbone transmission network and integration into the power grid of the variable electricity generated from wind. - Highlights: → Wind power competitiveness is driven by meteorology and proximity to the grid. → We spatially model U.S. onshore wind under ranges of subsidies and costs. → Wind power is competitive at a PTC subsidy of 2.1 cents/kWh. → Under current PTC levels, profitable wind potential far exceeds U.S. power demand.

  12. Trend in China's Wind Power

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ Attractive prospects for wind power development Sha Yiqiang:In recent years,the development and utilization of wind energy has achieved remarkable results.To the end of 2007,the installed capacity of the wind power had reached 94 000 MW all over the world,which is distributed over 60 countries.Over the past 20 years,the wind power generation installation cost has been reduced by 50% and is closing to that of the conventional energy resources.Meanwhile,the single unit capacity,efficiency and reliability of wind power have been greatly improved.

  13. The design, simulation and testing of an urban vertical axis wind turbine with the omni-direction-guide-vane

    International Nuclear Information System (INIS)

    Chong, W.T.; Fazlizan, A.; Poh, S.C.; Pan, K.C.; Hew, W.P.; Hsiao, F.B.

    2013-01-01

    Graphical abstract: Solar energy, renewable energy, urban wind energy, environment, augmented wind turbine. Highlights: ► A system for on-site wind–solar hybrid power generation and rain water collection. ► The omni-direction-guide-vane (ODGV) overcomes the weak wind and turbulence conditions in urban areas. ► The ODGV improves the wind turbine performance by speeding-up and guiding the wind. ► The ODGV is designed to blend into the building architecture with safety enhancement. ► The wind tunnel test and CFD simulation results are presented. - Abstract: A novel omni-direction-guide-vane (ODGV) that surrounds a vertical axis wind turbine (VAWT) is designed to improve the wind turbine performance. Wind tunnel testing was performed to evaluate the performance of a 5-bladed (Wortmann FX63-137 airfoil) H-rotor wind turbine, with and without the integration of the ODGV. The test was conducted using a scaled model turbine which was constructed to simulate the VAWT enclosed by the ODGV placed on a building. The VAWT shows an improvement on its self-starting behavior where the cut-in speed was reduced with the integration of the ODGV. Since the VAWT is able to self-start at a lower wind speed, the working hour of the wind turbine would increase. At a wind speed of 6 m/s and under free-running condition (only rotor inertia and bearing friction were applied), the ODGV helps to increase the rotor rotational speed by 182%. With extra load application at the same wind speed (6 m/s), the wind turbine power output was increased by 3.48 times at its peak torque with the aid of the ODGV. The working concept of the ODGV is to minimize the negative torque zone of a lift-type VAWT and to reduce turbulence and rotational speed fluctuation. It was verified by re-simulating the torque coefficient data of a single bladed (NACA 0015 airfoil) VAWT published by the Sandia National Laboratories. From the simulation results, with the presence of the ODGV, it was shown that the

  14. DOE/NREL supported wind energy activities in Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system, also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.

  15. 1992 status report: U.S. sets new wind energy record as domestic market stagnates

    International Nuclear Information System (INIS)

    Gipe, Paul

    1993-01-01

    The current status of the USA wind turbine industry is reviewed both in terms of its domestic market and the global market. Although performance in the domestic market continues to improve and costs continue to drop, the growing European market resulting from their national policies to encourage renewable energies threaten the previous US dominance in this field. It is argued that US national energy policy should aid wind energy development. (UK)

  16. Usefulness of US-guided automated gun biopsy of nonpalpable breast lesions

    Energy Technology Data Exchange (ETDEWEB)

    Kwak, Min Sook; Kim, Hak Soo; Lee, Han Kyung; Koh, Sung Hye; O, Eun Young; Yoon, Myung Hwan; Yang, Dal Mo; Kim, Hyung Sik [Chungang Gil Hospital, Incheon (Korea, Republic of)

    1997-11-01

    To evaluate the clinical usefulness of ultrasonography(US)-guided automated gun biopsy of nonpalpable breast lesions. In 30 nonpalpable breast lesions over 0.6cm and detected on US, we performed US-guided biopsy using an 18-gauge automated biopsy gun. Two to four specimens were obtained from each lesion. We analyzed the site, size and depth of the lesions, and the length and histopathologic results of the specimens. In four lesions, surgical biopsy and gun biopsy results were compared. In 29 of 30 lesions(96.7%), specimens were adequate for histopathologic diagnosis, and this was as follows : one case of infiltrating ductal carcinoma, 13 of fibrocystic disease, 10 of fibrocystic disease versus fibroadenoma and one of fibrodenoma. There was also one reactive hyperplasia of LN, and one fatty one and two normal tissues, and in these four lesions, agreement between gun and surgical biopsy results was 100%. The only complication was minor bleeding, which was controlled by compression. US-guided automated gun biopsy is a clinically useful and safe procedure for evaluating nonpalpable breast lesions detected on US.

  17. Usefulness of US-guided automated gun biopsy of nonpalpable breast lesions

    International Nuclear Information System (INIS)

    Kwak, Min Sook; Kim, Hak Soo; Lee, Han Kyung; Koh, Sung Hye; O, Eun Young; Yoon, Myung Hwan; Yang, Dal Mo; Kim, Hyung Sik

    1997-01-01

    To evaluate the clinical usefulness of ultrasonography(US)-guided automated gun biopsy of nonpalpable breast lesions. In 30 nonpalpable breast lesions over 0.6cm and detected on US, we performed US-guided biopsy using an 18-gauge automated biopsy gun. Two to four specimens were obtained from each lesion. We analyzed the site, size and depth of the lesions, and the length and histopathologic results of the specimens. In four lesions, surgical biopsy and gun biopsy results were compared. In 29 of 30 lesions(96.7%), specimens were adequate for histopathologic diagnosis, and this was as follows : one case of infiltrating ductal carcinoma, 13 of fibrocystic disease, 10 of fibrocystic disease versus fibroadenoma and one of fibrodenoma. There was also one reactive hyperplasia of LN, and one fatty one and two normal tissues, and in these four lesions, agreement between gun and surgical biopsy results was 100%. The only complication was minor bleeding, which was controlled by compression. US-guided automated gun biopsy is a clinically useful and safe procedure for evaluating nonpalpable breast lesions detected on US

  18. What are the costs of an accelerated installation of new onshore wind power and photovoltaic plants?; Was kostet ein schnellerer Ausbau von Wind an Land und Photovoltaik?

    Energy Technology Data Exchange (ETDEWEB)

    Nestle, Uwe [EnKliP Energie- und KlimaPolitik - Beratung, Kiel (Germany)

    2015-01-15

    The most recent amendment of the Renewable Energy Law (EEG), enacted in August 2014, was the first to set limits to the further expansion of renewable energy. However, the continued growth of production capacity from onshore wind and photovoltaic energy would actually only have a low impact on the level of the EEG surcharge. The costs that would be incurred instead through the installation of new natural gas power stations are practically the same. If production capacities from onshore wind and photovoltaic plants grow faster than envisaged by the EEG, it will bring the federal government faster towards its goal of lowering the average remuneration to below 12 cents per kWh.

  19. Development, financing, construction and exploitation of onshore and offshore wind farms. Let us combine our energies for a sustainable future

    International Nuclear Information System (INIS)

    Vignal, Philippe; Simon, Gregoire; Bales, Vincent

    2017-01-01

    After an indication of a brief history of the WPD company through some marking events, and an overview of its expertise and approach, this publication addresses its wind energy projects and gives brief descriptions of wind farms located in France, and then provides some data regarding onshore and offshore wind farm energy production by installations operated by this company in France and in other European countries. As far as offshore wind farm is concerned, planned projects are also briefly presented

  20. Wind Vision: A New Era for Wind Power in the United States (Highlights); U.S. Department of Energy (DOE), NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This is a four-part Wind Vision project, consisting of Wind Vision Highlights, Executive Summary, a Full Report, and Appendix. The U.S. Department of Energy (DOE) Wind Program, in close cooperation with the wind industry, led a comprehensive analysis to evaluate future pathways for the wind industry. The Wind Vision report updates and expands upon the DOE's 2008 report, 20% Wind Energy by 2030, and defines the societal, environmental, and economic benefits of wind power in a scenario with wind energy supplying 10% of national end-use electricity demand by 2020, 20% by 2030, and 35% by 2050.

  1. Assessment of Ports for Offshore Wind Development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Elkinton, Chris [DNV GL; Blatiak, Alicia; Ameen, Hafsa

    2014-03-21

    As offshore wind energy develops in the United States, port facilities will become strategic hubs in the offshore wind farm supply chain because all plant and transport logistics must transit through these facilities. Therefore, these facilities must provide suitable infrastructure to meet the specific requirements of the offshore wind industry. As a result, it is crucial that federal and state policy-makers and port authorities take effective action to position ports in the offshore wind value chain to take best advantage of their economic potential. The U.S. Department of Energy tasked the independent consultancy GL Garrad Hassan (GL GH) with carrying out a review of the current capability of U.S. ports to support offshore wind project development and an assessment of the challenges and opportunities related to upgrading this capability to support the growth of as many as 54 gigawatts of offshore wind installed in U.S. waters by 2030. The GL GH report and the open-access web-based Ports Assessment Tool resulting from this study will aid decision-makers in making informed decisions regarding the choice of ports for specific offshore projects, and the types of investments that would be required to make individual port facilities suitable to serve offshore wind manufacturing, installation and/or operations. The offshore wind industry in the United States is still in its infancy and this study finds that additional port facilities capable of supporting offshore wind projects are needed to meet the anticipated project build-out by 2030; however, no significant barriers exist to prevent the development of such facilities. Furthermore, significant port capabilities are in place today with purpose-build port infrastructure currently being built. While there are currently no offshore wind farms operating in the United States, much of the infrastructure critical to the success of such projects does exist, albeit in the service of other industries. This conclusion is based

  2. Experiences with a small scale Solar/Wind pilot installation for basic electrification in the chilean altiplano

    Energy Technology Data Exchange (ETDEWEB)

    Sapiain, Raul; Ovalle, Ricardo; Torres, Ariel; Brockmeyer, Ricarda; Schmidt, Reinhold [Centro de Energias Renovables/Universidad de Tarapaca, Arica, (Chile); Meer, Andreas V. [Solar Institute, Juelich (Germany)

    1997-12-31

    Basic rural electrification programmes are already carried out in the rural areas of northern Chile by local communities and local governments using photovoltaic systems. Solar Home Systems, 12 VDC are installed for individual households while systems for schools, public lighting etc. are realized with bigger systems, 220 VAC. Within a cooperation with the Solar Institute of the Fachhochschule Juelich, Germany, the Renewable Energy Center of the University of Tarapaca designed, installed and evaluated the first solar/wind hybrid installation for basic electrification in northern Chile, realized in Colpitas, a typical small village in the chilean altiplano. The following paper presents results and experiences of this first pilot installation. [Espanol] Ya se estan llevando a cabo programas de electrificacion rural basica en las areas rurales del Norte de Chile por las comunidades y los gobiernos locales, usando sistemas fotovoltaicos. Se instalan Sistemas Domesticos Solares de 12VDC para casas-habitacion individuales, mientras que los sistemas para escuelas, alumbrado publico, etc., se ejecutan con sistemas mas grandes de 220VAC. Con la coperacion del Instituto Solar de la Fachhochschule en Julich, Alemania, el Centro de Energia Renovable de la Universidad de Tarapaca, diseno, instalo y evaluo, la primera instalacion hibrida solar/viento para electrificacion basica en el Norte de Chile, realizado en Colpitas, un pueblo tipico pequeno del altiplano chileno. El siguiete articulo presenta los resultados y experiencias de esta primera instalacion piloto.

  3. Experiences with a small scale Solar/Wind pilot installation for basic electrification in the chilean altiplano

    Energy Technology Data Exchange (ETDEWEB)

    Sapiain, Raul; Ovalle, Ricardo; Torres, Ariel; Brockmeyer, Ricarda; Schmidt, Reinhold [Centro de Energias Renovables/Universidad de Tarapaca, Arica, (Chile); Meer, Andreas V [Solar Institute, Juelich (Germany)

    1998-12-31

    Basic rural electrification programmes are already carried out in the rural areas of northern Chile by local communities and local governments using photovoltaic systems. Solar Home Systems, 12 VDC are installed for individual households while systems for schools, public lighting etc. are realized with bigger systems, 220 VAC. Within a cooperation with the Solar Institute of the Fachhochschule Juelich, Germany, the Renewable Energy Center of the University of Tarapaca designed, installed and evaluated the first solar/wind hybrid installation for basic electrification in northern Chile, realized in Colpitas, a typical small village in the chilean altiplano. The following paper presents results and experiences of this first pilot installation. [Espanol] Ya se estan llevando a cabo programas de electrificacion rural basica en las areas rurales del Norte de Chile por las comunidades y los gobiernos locales, usando sistemas fotovoltaicos. Se instalan Sistemas Domesticos Solares de 12VDC para casas-habitacion individuales, mientras que los sistemas para escuelas, alumbrado publico, etc., se ejecutan con sistemas mas grandes de 220VAC. Con la coperacion del Instituto Solar de la Fachhochschule en Julich, Alemania, el Centro de Energia Renovable de la Universidad de Tarapaca, diseno, instalo y evaluo, la primera instalacion hibrida solar/viento para electrificacion basica en el Norte de Chile, realizado en Colpitas, un pueblo tipico pequeno del altiplano chileno. El siguiete articulo presenta los resultados y experiencias de esta primera instalacion piloto.

  4. Potential for increased wind-generated electricity utilization using heat pumps in urban areas

    International Nuclear Information System (INIS)

    Waite, Michael; Modi, Vijay

    2014-01-01

    Highlights: • Large-scale wind power and increased electric heat pumps were evaluated. • A deterministic model of wind power and electricity demand was developed. • Sub-models for space heating and domestic hot water demand were developed. • Increased use of heat pumps can improve the viability of large-scale wind power. • Larger wind power capacity can meet a target utilization rate with more heat pumps. - Abstract: The U.S. has substantial wind power potential, but given wind’s intermittent availability and misalignment with electricity demand profiles, large-scale deployment of wind turbines could result in high electricity costs due to energy storage requirements or low utilization rates. While fuel switching and heat pumps have been proposed as greenhouse gas (GHG) emissions and energy reduction strategies at the building scale, this paper shows that heat pump adoption could have additional system-wide benefits by increasing the utilization of wind-generated electricity. A model was developed to evaluate the effects of coupling large-scale wind power installations in New York State with increased use of electric heat pumps to meet a portion of space heating and domestic hot water (DHW) demands in New York City. The analysis showed significant increases in wind-generated electricity utilization with increased use of heat pumps, allowing for higher installed capacity of wind power. One scenario indicates that 78.5% annual wind-generated electricity utilization can be achieved with 3 GW of installed wind power capacity generated electricity equal to 20% of existing NYC annual electricity demand; if 20% of space heating and DHW demands are provided by heat pumps, the 78.5% utilization rate can be achieved with an increase of total wind power capacity to 5 GW. Therefore, this integrated supply–demand approach could provide additional system-wide emissions reductions

  5. Development of large scale and wind energy conservation system. Operational studies on a large-scale wind energy conservation system; Ogata furyoku hatsuden system no kaihatsu. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Takita, M [New Energy and Industrial Technology Development Organization, Tokyo (Japan)

    1994-12-01

    Described herein are the results of the FY1994 research program for operational studies on a large-scale wind energy conversion system. A total of 8 domestic and foreign cases are studied for wind energy conversion cost, to clarify the causes for higher cost of the Japanese system. The wind power systems studied include Japanese (5 units at Tappi Wind Park, the same type supplied by company M), US (California Wind Farm, 300 units) and UK (Wales Wind Farm, 103 units) systems. The investment costs are 639, 285 and 189 thousand yen/kW for the Japanese, US and UK systems, respectively. It is also revealed that the power plant itself and assembling costs account for a majority (70 to 88%) of the total investment cost. The higher cost of the Japanese system results from a smaller number of units installed, and the power plant cost can be drastically reduced by mass production. Increasing size also reduces cost greatly.

  6. Wind turbine reliability : a database and analysis approach.

    Energy Technology Data Exchange (ETDEWEB)

    Linsday, James (ARES Corporation); Briand, Daniel; Hill, Roger Ray; Stinebaugh, Jennifer A.; Benjamin, Allan S. (ARES Corporation)

    2008-02-01

    The US wind Industry has experienced remarkable growth since the turn of the century. At the same time, the physical size and electrical generation capabilities of wind turbines has also experienced remarkable growth. As the market continues to expand, and as wind generation continues to gain a significant share of the generation portfolio, the reliability of wind turbine technology becomes increasingly important. This report addresses how operations and maintenance costs are related to unreliability - that is the failures experienced by systems and components. Reliability tools are demonstrated, data needed to understand and catalog failure events is described, and practical wind turbine reliability models are illustrated, including preliminary results. This report also presents a continuing process of how to proceed with controlling industry requirements, needs, and expectations related to Reliability, Availability, Maintainability, and Safety. A simply stated goal of this process is to better understand and to improve the operable reliability of wind turbine installations.

  7. Advancing the Growth of the U.S. Wind Industry: Federal Incentives, Funding, and Partnership Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-02-01

    The U.S. Department of Energy’s (DOE’s) Wind Energy Technologies Office (WETO) works to accelerate the development and deployment of wind power. The office provides information for researchers, developers,businesses, manufacturers, communities, and others seeking various types of federal assistance available for advancing wind projects.

  8. Understanding wind turbine price trends in the U.S. over the past decade

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan

    2012-01-01

    On a $/kW basis, wind turbine prices in the U.S. have declined by nearly one-third on average since 2008, after having previously doubled over the period from 2002 through 2008. These two substantial and opposing trends over the past decade – and particularly the earlier price doubling – run counter to the smooth, gradually declining cost trajectories predicted by standard learning curve theory. Taking a bottom-up approach, we examine seven possible drivers of wind turbine prices in the U.S., with the goal of estimating the degree to which each contributed to the doubling in turbine prices from 2002 through 2008, as well as the subsequent decline in prices through 2010. In aggregate, these seven drivers – which include changes in labor costs, warranty provisions, manufacturer profitability, turbine scaling, raw materials prices, energy prices, and foreign exchange rates – explain from 70% to 90% (depending on the year) of empirically observed wind turbine price movements in the U.S. through 2010. Turbine scaling is found to have been the largest single contributor to the price doubling through 2008, although the incremental cost of scaling has been justified by greater energy capture, resulting in a lower cost of wind generation. - Highlights: ► Having doubled from 2002 to 2008, wind turbine prices have since fallen by one-third. ► We analyze seven potential drivers of wind turbine prices over the past decade. ► Turbine scaling has had the largest influence, followed by weakness in the dollar. ► Changes in the price of energy inputs had the smallest impact.

  9. Resolution 8.069/012 It approval the regulations for the installation of of great bearing structures, intended for wind power generation

    International Nuclear Information System (INIS)

    2012-01-01

    This resolution is about: regulations made by the Florida Administration, Oriental Republic of Uruguay to locate of great bearing structures intended for wind power generation.At the same time they have been included them :definition, objectives, installation rights, site areas, minimum distances, presentation, technical responsibility, maintenance, external documentation

  10. Wind farm efficiency assessed by WRF with a statistical-dynamical approach

    DEFF Research Database (Denmark)

    Volker, Patrick; Badger, Jake; Hahmann, Andrea N.

    2016-01-01

    the power production of a target wind farm and (II) how large wind farms can get if they are to remain efficient and productive power generators. The modelling of wind farm wake flows is challenging, since it includes processes from the micro- to mesoscale meteorology. We use the Weather Research......A pledge to increase the share of renewable energies has led to a focus on offshore wind energy in many western European countries. With an increasing number of offshore wind farms to be installed it becomes important to understand (I) the degree to which wakes from neighbouring wind farms affect...... and Forecast (WRF) model that allows us to simulate mesoscale features of wind farm wakes. Its limited horizontal resolution – in microscale terms – however, requires flow characteristics, such as single turbine wakes, to be parametrised....

  11. Dynamical and statistical-dynamical modelling of wind farm flows with WRF

    DEFF Research Database (Denmark)

    Volker, Patrick; Badger, Jake; Hahmann, Andrea N.

    2016-01-01

    the power production of a target wind farm and (II) how large wind farms can get if they are to remain efficient and productive power generators. The modelling of wind farm wake flows is challenging, since it includes processes from the micro- to mesoscale meteorology. We use the Weather Research......A pledge to increase the share of renewable energies has led to a focus on offshore wind energy in many western European countries. With an increasing number of offshore wind farms to be installed it becomes important to understand (I) the degree to which wakes from neighbouring wind farms affect...... and Forecast (WRF) model that allows us to simulate mesoscale features of wind farm wakes. Its limited horizontal resolution – in microscale terms – however, requires flow characteristics, such as single turbine wakes, to be parametrised....

  12. Nodular fasciitis of the face diagnosed by US-guided core needle biopsy: a case report

    International Nuclear Information System (INIS)

    Lee, Sang Kwon; Kwon, Sun Young

    2006-01-01

    We report here on a case of nodular fasciitis (NF) that was diagnosed by ultrasonography (US)-guided core needle biopsy in a 31-year-old man, and we include the US and computed tomographic (CT) findings and the histopathologic findings at US-guided core needle biopsy (CNB). We suggest that high-resolution US is useful for the detailed evaluation of NF in the superficial regions, such as the face, and US-guided CNB is useful for the definitive histologic diagnosis of NF without causing scarring

  13. Report on the safety of wind turbines installations; Rapport sur la securite des installations eoliennes

    Energy Technology Data Exchange (ETDEWEB)

    Guillet, R.; Leteurtrois, J.P.

    2004-07-01

    This report aims to study the regulatory framework governing the safety of wind turbines and proposes improvement actions. It concerns the wind turbines risk assessment, the technical bases of the wind turbines safety, the regulation relative to the safety and possible evolutions. (A.L.B.)

  14. Wind energy - The facts. An analysis of wind energy in the EU-25

    International Nuclear Information System (INIS)

    2004-02-01

    Since the previous edition of Wind Enera - The Facts was published five years ago, the wind energy sector has undergone rapid change and transformation. There has been an explosion in demand for and Interest in a cleaner energy world from politicians, institutions, policy makers and regulators, the media, commentators and the general public. Such interest necessitates a greater depth of understanding of the wind power sector if informed choices and policy decisions are to be made. The European Wind Energy Association (EWEA), and the European Commission's Directorate General for Transport' and Energy have collaborated on this report to provide a detailed overview of the wind power sector. Wind Enera - The Facts provides a comprehenslve overview of the essential issues concerning wind power today: technology, cost, prices, environment, industry and employment, market, and research and development. Wind energy is a relatively young but rapidly expanding industry. Over the past decade, global installed capacity has increased from 2,500 megawatts (MW) in 1992 to just over 40,000 MW at the end of 2003, at an annual growth rate of near 30%. Almost three quarters of this capacity has been installed in Europe. Penetration levels in the electricity sector have reached 20% in Denmark and about 5% in both Germany and Spain. The north German state of Schleswig-Holstein has 1,800 MW of installed wind capacity, enough to meet 30% of the region's total electricity demand, while in Navarra, in Spain, 50% of consumption is met by wind power. If positive policy support continues to develop, EWEA has projected that wind power will achieve an installed capacity of 75,000 MW in the EU-15 by 2010. This would represent an overall contribution to electricity supply of 5.5%. By 2020, this figure is expected to increase to more than 12%, with wind power providing energy equal to the demand of 195 million European household consumers. (au)

  15. Remote monitoring of solar and wind power installation via GSN and Internet; Sistema de telegestion de instalaciones solares y eolicas a traves de GSN e Internet

    Energy Technology Data Exchange (ETDEWEB)

    Caballero, P. M. L.; Valmaseda, J. C. T.; Uruena, H. J. C.; Bujedo, L. A. N.

    2004-07-01

    Remote monitoring of solar and wind power installations is important for installers since some local rules oblige them to keep a maintenance plan, and the installations are normally sparse. It is also important for end users because they demand more information about the system and management capacity each time. In this paper we present CARTIF's development for the company ENERPAL to fulfil these needs. It is formed by two subsystems: one for data acquisition and control of the installations via GSM, and the other, a server software that allows the user to access her installation remotely through the Internet in order to manage it. (Author)

  16. Floating wind turbine system

    Science.gov (United States)

    Viterna, Larry A. (Inventor)

    2009-01-01

    A floating wind turbine system with a tower structure that includes at least one stability arm extending therefrom and that is anchored to the sea floor with a rotatable position retention device that facilitates deep water installations. Variable buoyancy for the wind turbine system is provided by buoyancy chambers that are integral to the tower itself as well as the stability arm. Pumps are included for adjusting the buoyancy as an aid in system transport, installation, repair and removal. The wind turbine rotor is located downwind of the tower structure to allow the wind turbine to follow the wind direction without an active yaw drive system. The support tower and stability arm structure is designed to balance tension in the tether with buoyancy, gravity and wind forces in such a way that the top of the support tower leans downwind, providing a large clearance between the support tower and the rotor blade tips. This large clearance facilitates the use of articulated rotor hubs to reduced damaging structural dynamic loads. Major components of the turbine can be assembled at the shore and transported to an offshore installation site.

  17. Numerical study of a novel procedure for installing the tower and Rotor Nacelle Assembly of offshore wind turbines based on the inverted pendulum principle

    Science.gov (United States)

    Guachamin Acero, Wilson; Gao, Zhen; Moan, Torgeir

    2017-09-01

    Current installation costs of offshore wind turbines (OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study (based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies (RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel (HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV (in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV (which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting (response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather- and water depth-sensitivity, this novel procedure is demonstrated to be viable.

  18. Field experience of a project with the Dutch Consultancy Services Wind Energy Developing Countries (CWD) and traditional wind pumps in Nicaragua

    International Nuclear Information System (INIS)

    Holtslag, H.A.G.

    1991-01-01

    The main objective of the title project, which started in October 1986, was to promote the use of wind energy in Nicaragua by means of a study on the wind potential, the production and use of wind pumps, and repairs of traditional wind pumps. Involved in the project were a Dutch project coordinator, a Dutch, a German and a Danish advisor for the technical aspects and a Dutch advisor for irrigation. The Nicaraguan National Institute of Energy coordinated the project until 1988. Then the (state) factory, where the mills were manufactured, took over. The study on the wind potential was only partly completed. The production was done at the state factory in Managua (IMEP), where two models were produced: a traditional mill with a rotor of 3 meter, and a CWD-mill with a rotor of 5 meter. Adaptations, based on field experiences, were made in the CWD-model in the third year of the project. The total production after 4 years was 50 mills of 3 meter and 15 mills of 5 meter. The objective was 200 mills per year after the third year of the project. Of the 3 meter mill, 35 were installed and used mainly for cattle watering (sales price US$ 2,200). Of the 5 meter mill, 7 were installed in demonstration projects for small-scale irrigation (sales price US$ 4,000). The production rate of the 3 meter mill at the end of the project was 10 mills per 8 weeks. Production of the 5 meter mill stopped for several reasons, but may go on when adaptations in the mill prove to be effective. Repairs of the traditional mills could not be realized. The overall conclusion is that the achievements of the project were lower than the original objectives for reasons which are formulated in the conclusions. 3 ills

  19. International cooperation on wind energy for rural areas in China

    International Nuclear Information System (INIS)

    Pengfei, Shi

    1991-01-01

    An overview of the recent wind energy activities in China is given. China has a long history in harnessing the wind; modern development started during the late seventies. The Chinese wind potential is mainly in the coastal regions (North East and South East) and in Inner Mongolia. The actual total installed wind power is estimated to be 15 MW. For low lift (within 2 meters), high volume applications, e.g. salt making in salt pans along the coast, of mechanical windmills coupled to screw pumps have been developed. In Inner Mongolia, small portable wind generators (50-200 MW) charging car batteries are supplying some 100,000 farmer and herdsman families with electricity for television and lighting. The average energy consumption is between 200 and 300 kWh per year and the corresponding kWh price 0.40 to 0.50 US$. Since 1988 the demand for small wind generators declined due to the lower wool prices on the world market, affecting the income of the herdsman, and due to the fact that the machines have to be marketed in remote, less accesible rural areas. Various demonstration projects have been set up, f.e. a decentralized energy system on Dachen Island, including a wind diesel hybrid system. On Kongdon Island a 60 kW wind turbine and a 60 kW diesel generator were installed. With several foreign wind turbine manufacturers cooperations have been set up for licensed production in China. Also wind farms have been installed. The largest Chinese prototype at the moment is a 32 meter diameter, 200 kW machine. Western organizations or manufacturers are involved in most of the cooperatives. For the next five years the focus is on development of a large 150 and 200 kW machine and a windmill coupled to a centrifugal pump for lifting heads between 2 and 5 meter. 1 fig., 3 refs

  20. International wind energy development. World market update 1998. Forecast 1999-2003

    International Nuclear Information System (INIS)

    1999-03-01

    This is the fourth issue of the annual World Market Update from BTM Consult ApS, covering the year 1998. All figures in the status part refer to end of the year 1998, the past 3 years development is also assessed and the forecast looks 5 years ahead. The most significant figures and trends in 1998 were: The marketplace - The annual installation of new wind power capacity increased by 55% resulting in a cumulative installation by the end of 1998 of 10.153 MW. 1.766 MW was installed in Europe and the region is still the leading market regarding utilization of wind energy. The US market took a rapid pace and installed 577 MW during the year. The large Enron Wind Corp has taken the larger part of this market. On the supply side Danish NEG Micon A/S has consolidated the position as being the supplier of the most MW wind capacity in the world and the company has a world market share of 23,5 per cent. The company acquired the Danish Wind World af 1997 A/S which was among the larger companies in 1997. Also the Dutch manufacturer NedWind B.V. was acquired by NEG Micon A/S curing 1998. The group of 'other' manufactureres represents a minor percentage of deliveries than earlier and concentration in the industry seems to continue. The liberalized Energy Market and how to position the industry in this different economic environment will be a challenge for the wind industry way into the next century. In Europe, the European Commission's draft Directive with proposal for an outline of common rules for support of among other renewables wind energy has been set on another route which seems to delay the paper. In the US there are still hopes for a new period with PTC (Production Tax Credit). There are in some States hopes among the wind energy people that the 'Green Market Programs' will play a more dominant role in the future. In Asia the crises seems to halt the wind power development. Forecast and Technical trends - Based on the positive trends in the markets for wind power

  1. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  2. US-guided percutaneous biopsies with a biopsy gun

    International Nuclear Information System (INIS)

    Ahn, In Oak; Kim, Hyung Jin; Kim, Jae Hyung; Lee, Goo; Jung, Sung Hoon

    1993-01-01

    Core tissue for histologic study is believed by many pathologist to be more diagnostic than material from needle aspiration. Recently introduced automatched biopsy gun simplifies core biopsies with increased quantity and quality of samples. Authors performed 38 percutaneous biopsies from 38 patients with 18G automated biopsy guns under US guide. Diagnostic target tissues were obtained in 33 biopsies(87%), inadequate tissues in 4(11%), and adequate but not of target tissue in 1(3%). There was no major complication requiring treatment, but pain needing analgesics and pain with nausea/vomiting were experienced in 2 and 1 biopsies respectively. Average number of needle passes was 1.5. We concluded that US guided gun biopsy was a easy and safe way to obtain tissue samples of good quantity and quality, especially useful in hospitals without constant availability of specialist in cytopathology

  3. Impact and Process Evaluation of the U.S. Department of Energy's Wind Powering America Initiative

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-05-01

    This report presents an evaluation of the impacts and processes of the former Wind Powering America(WPA) initiative sponsored by the U.S. Department of Energy (DOE). WPA has an underlying goal of dramatically increasing the use of wind energy in the U.S.

  4. 32 CFR Appendix C to Part 247 - Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and Distribution of...

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Mailing of DoD Newspapers, Magazines, CE Guides...) MISCELLANEOUS DEPARTMENT OF DEFENSE NEWSPAPERS, MAGAZINES AND CIVILIAN ENTERPRISE PUBLICATIONS Pt. 247, App. C Appendix C to Part 247—Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and...

  5. The Effect of Wind-Turbine Wakes on Summertime US Midwest Atmospheric Wind Profiles as Observed with Ground-Based Doppler Lidar

    Science.gov (United States)

    Rhodes, Michael E.; Lundquist, Julie K.

    2013-07-01

    We examine the influence of a modern multi-megawatt wind turbine on wind and turbulence profiles three rotor diameters (D) downwind of the turbine. Light detection and ranging (lidar) wind-profile observations were collected during summer 2011 in an operating wind farm in central Iowa at 20-m vertical intervals from 40 to 220 m above the surface. After a calibration period during which two lidars were operated next to each other, one lidar was located approximately 2D directly south of a wind turbine; the other lidar was moved approximately 3D north of the same wind turbine. Data from the two lidars during southerly flow conditions enabled the simultaneous capture of inflow and wake conditions. The inflow wind and turbulence profiles exhibit strong variability with atmospheric stability: daytime profiles are well-mixed with little shear and strong turbulence, while nighttime profiles exhibit minimal turbulence and considerable shear across the rotor disk region and above. Consistent with the observations available from other studies and with wind-tunnel and large-eddy simulation studies, measurable reductions in wake wind-speeds occur at heights spanning the wind turbine rotor (43-117 m), and turbulent quantities increase in the wake. In generalizing these results as a function of inflow wind speed, we find the wind-speed deficit in the wake is largest at hub height or just above, and the maximum deficit occurs when wind speeds are below the rated speed for the turbine. Similarly, the maximum enhancement of turbulence kinetic energy and turbulence intensity occurs at hub height, although observations at the top of the rotor disk do not allow assessment of turbulence in that region. The wind shear below turbine hub height (quantified here with the power-law coefficient) is found to be a useful parameter to identify whether a downwind lidar observes turbine wake or free-flow conditions. These field observations provide data for validating turbine-wake models and wind

  6. US-guided diffuse optical tomography for breast lesions: the reliability of clinical experience

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min Jung; Kim, Ji Youn; Youn, Jung Hyun; Kim, Myung Hyun; Koo, Hye Ryoung; Kim, Soo Jin; Sohn, Yu-Mee; Moon, Hee Jung; Kim, Eun-Kyung [Yonsei University College of Medicine, Institute of Radiological Science, Seoul (Korea, Republic of); Yonsei University College of Medicine, Department of Radiology, Seoul (Korea, Republic of)

    2011-07-15

    To prospectively assess the reliability of US-guided diffuse optical tomography (US-DOT) using interobserver agreement for the diagnosis of breast lesions with individual real-time imaging and to assess the interobserver agreement of conventional sonography (US) combined with US-DOT for differentiation between benignity and malignancy breast lesions. An Institutional Review Board approved this study, and all subjects provided written informed consent. 122 breast lesions in 111 patients evaluated with US-guided core biopsy were included. Assessments with US and US-DOT for cases subjected to biopsy were obtained by two radiologists using individual real-time imaging prior to biopsy and were prospectively recorded by each performer. With DOT, the total haemoglobin concentration (THC) for each breast lesion was measured. Histopathological results from US-guided biopsies were used as a reference standard. To assess measurement interobserver agreement, the intraclass correlation coefficient (ICC) and the Bland-Altman plot were used for THC in US-DOT and the kappa values and ROC analysis were used to evaluate the diagnostic performances of the US BI-RADS final assessment in US and combined US and US-DOT. Of 122 US-guided core biopsied lesions, 83 (68.0%) were diagnosed as benign, and 39 (32.0%) as malignant. Excellent correlation was seen in the THC in US-DOT (ICC score 0.796; 95% confidence interval, 0.708-0.857). The interobserver agreement in BI-RADS final assessment with US and US-DOT (almost perfect; {kappa} = 0.8618) was improved compared with that of US (substantial agreement, {kappa} = 0.6574). However, the overall areas under the ROC curve did not show significant differences between US and combined US and US-DOT, 0.8894 and 0.8975, respectively (P = 0.981). The reliability of THC in US-DOT showed excellent correlation in overall real-time performance. Although the inter-observer agreement for BI-RADS final assessment of US was improved by using US-DOT, the

  7. Hurricane Resilient Wind Plant Concept Study Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Dibra, Besart [Keystone Engineering Inc., Vonore, TN (United States); Finucane, Zachary [Keystone Engineering Inc., Vonore, TN (United States); Foley, Benjamin [Keystone Engineering Inc., Vonore, TN (United States); Hall, Rudy [Keystone Engineering Inc., Vonore, TN (United States); Damiani, Rick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Maples, Benjamin [National Renewable Energy Lab. (NREL), Golden, CO (United States); Parker, Zachary [National Renewable Energy Lab. (NREL), Golden, CO (United States); Robertson, Amy [National Renewable Energy Lab. (NREL), Golden, CO (United States); Scott, George [National Renewable Energy Lab. (NREL), Golden, CO (United States); Stehly, Tyler [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wendt, Fabian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Andersen, Mads Boel Overgaard [Siemens Wind Power A/S, Brande (Denmark); Standish, Kevin [Siemens Wind Power A/S, Brande (Denmark); Lee, Ken [Wetzel Engineering Inc., Round Rock, TX (United States); Raina, Amool [Wetzel Engineering Inc., Round Rock, TX (United States); Wetzel, Kyle [Wetzel Engineering Inc., Round Rock, TX (United States); Musial, Walter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schreck, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    Hurricanes occur over much of the U.S. Atlantic and Gulf coasts, from Long Island to the U.S.-Mexico border, encompassing much of the nation's primary offshore wind resource. Category 5 hurricanes have made landfall as far north as North Carolina, with Category 3 hurricanes reaching New York with some frequency. Along the US West coast, typhoons strike with similar frequency and severity. At present, offshore wind turbine design practices do not fully consider the severe operating conditions imposed by hurricanes. Although universally applied to most turbine designs, International Electrotechnical Commission (IEC) standards do not sufficiently address the duration, directionality, magnitude, or character of hurricanes. To assess advanced design features that could mitigate hurricane loading in various ways, this Hurricane-Resilient Wind Plant Concept Study considered a concept design study of a 500-megawatt (MW) wind power plant consisting of 10-MW wind turbines deployed in 25-meter (m) water depths in the Western Gulf of Mexico. This location was selected because hurricane frequency and severity provided a unique set of design challenges that would enable assessment of hurricane risk and projection of cost of energy (COE) changes, all in response to specific U.S. Department of Energy (DOE) objectives. Notably, the concept study pursued a holistic approach that incorporated multiple advanced system elements at the wind turbine and wind power plant levels to meet objectives for system performance and reduced COE. Principal turbine system elements included a 10-MW rotor with structurally efficient, low-solidity blades; a lightweight, permanent-magnet, direct-drive generator, and an innovative fixed substructure. At the wind power plant level, turbines were arrayed in a large-scale wind power plant in a manner aimed at balancing energy production against capital, installation, and operation and maintenance (O&M) costs to achieve significant overall reductions in

  8. Quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    1975-04-01

    This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. (U.S.)

  9. Modeling of wind turbines for power system studies

    Energy Technology Data Exchange (ETDEWEB)

    Petru, T.

    2001-05-01

    When wind turbines are installed into the electric grid, the power quality is affected. Today, strict installation recommendations often prevail due to a lack of knowledge on this subject. Consequently, it is important to predict the impact of wind turbines on the electric grid before the turbines are installed. The thesis describes relevant power quality issues, discusses different configurations of wind turbines with respect to power quality and draw requirements regarding wind turbine modeling. A model of a stall-regulated, fixed-speed wind turbine system is introduced and its power quality impact on the electric grid is evaluated. The model is verified with field measurements.

  10. Wind energy in Canada: an action plan to 2000

    International Nuclear Information System (INIS)

    1996-02-01

    The role of the CanWEA (Canadian Wind Energy Association) is to promote the development and application of wind energy technology, products and services. CanWEA has established targets with regard to the future development of wind energy. Present targets include (1) the installation of 500 MW of wind generated electric capacity by the year 2000, and at least 5,000 MW by the year 2010, (2) the installation or export of 15,000 wind powered water pumping systems by the year 2000, (3) the installation of 2,500 micro-wind systems by the year 2000, and (4) the development of a Canadian wind energy industry which generates $200 million in annual sales by the year 2000

  11. Wind Resource Assessment of Gujarat (India)

    Energy Technology Data Exchange (ETDEWEB)

    Draxl, C.; Purkayastha, A.; Parker, Z.

    2014-07-01

    India is one of the largest wind energy markets in the world. In 1986 Gujarat was the first Indian state to install a wind power project. In February 2013, the installed wind capacity in Gujarat was 3,093 MW. Due to the uncertainty around existing wind energy assessments in India, this analysis uses the Weather Research and Forecasting (WRF) model to simulate the wind at current hub heights for one year to provide more precise estimates of wind resources in Gujarat. The WRF model allows for accurate simulations of winds near the surface and at heights important for wind energy purposes. While previous resource assessments published wind power density, we focus on average wind speeds, which can be converted to wind power densities by the user with methods of their choice. The wind resource estimates in this study show regions with average annual wind speeds of more than 8 m/s.

  12. Description of the North Sea wind climate for wind energy applications

    NARCIS (Netherlands)

    Coelingh, J.P.; Wijk, A.J.M. van; Cleijne, J.W.; Pleune, R.

    1992-01-01

    In The Netherlands it is foreseen that wind turbines will be installed on offshore locations in the North Sea before the year 2010. Therefore adequate knowledge of the offshore wind climate should be obtained, both for the estimation of energy yields and for the determination of wind load

  13. Co-generation of hydrogen from nuclear and wind: the effect on costs of realistic variations in wind generation. Paper no. IGEC-1-094

    International Nuclear Information System (INIS)

    Miller, A.I.; Duffey, R.B.

    2005-01-01

    Can electricity from high-capacity nuclear reactors be blended with the variable output of wind turbines to produce electrolytic hydrogen competitively? To be competitive with alternative sources, hydrogen produced by conventional electrolysis requires low-cost electricity (likely <2.5 cents US/kW.h). One approach is to operate interruptibly, allowing an installation to sell electricity when the grid price is high and to make hydrogen when it is low. Our previous studies show that this could be cost-competitive using nuclear power generator producing electricity around 3 cents US/kW.h. Although similar unit costs are projected for wind-generated electricity, idleness of the electrolysis facility due to the variability of wind-generated electricity imposes a significant cost penalty. This paper reports on ongoing work on the economics of blending electricity from nuclear and wind sources by using wind-generated power, when available, to augment the current through electrolysis equipment that is primarily nuclear-powered - a concept we call NuWind. A voltage penalty accompanies the higher current. A 10% increase in capital cost for electrolysis equipment to enable it to accommodate the higher rate of hydrogen generation is still substantially cheaper than the capital cost of wind-dedicated electrolysis. Real-time data for electricity costs have been combined with real-time wind variability. The variability in wind fields between sites was accommodated by assigning average wind speeds that produced an average electricity generation from wind of between 32 and 42% of peak capacity, which is typical of the expectations for superior wind-generation sites. (author)

  14. DESI-Detection of early-season invasives (software-installation manual and user's guide version 1.0)

    Science.gov (United States)

    Kokaly, Raymond F.

    2011-01-01

    This report describes a software system for detecting early-season invasive plant species, such as cheatgrass. The report includes instructions for installing the software and serves as a user's guide in processing Landsat satellite remote sensing data to map the distributions of cheatgrass and other early-season invasive plants. The software was developed for application to the semi-arid regions of southern Utah; however, the detection parameters can be altered by the user for application to other areas.

  15. Supply Chain and Blade Manufacturing Considerations in the Global Wind Industry (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    James, Ted [National Renewable Energy Lab. (NREL), Golden, CO (United States); Goodrich, Alan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-12-12

    This briefing provides an overview of supply chain developments in the global wind industry and a detailed assessment of blade manufacturing considerations for U.S. end-markets. The report discusses the international trade flows of wind power equipment, blade manufacturing and logistical costs, and qualitative issues that often influence factory location decisions. To help guide policy and research and development strategy decisions, this report offers a comprehensive perspective of both quantitative and qualitative factors that affect selected supply chain developments in the growing wind power industry.

  16. Wind Power Today: 1998 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Tromly, K.

    1999-06-17

    The US Department of Energy's Office of Energy Efficiency and Renewable Energy manages the Federal Wind Energy Program. The mission of the program is to help the US wind industry to complete the research, testing, and field verification needed to fully develop advanced wind technologies that will lead the world in cost-effectiveness and reliability. This publication, printed annually, provides a summary of significant achievements in wind energy made during the previous calendar year. Articles include wind energy in the Midwest, an Alaskan wind energy project, the US certification program, structural testing, and the federal program in review.

  17. Management of soils polluted by activities of a basic nuclear installations. Guide Nr 24, Release of the 2016/08/30

    International Nuclear Information System (INIS)

    2016-01-01

    After having indicated the relevant regulatory texts and guides related to sanitation and dismantling, and having stated definitions of some important terms, this guide addresses the sanitation or soil management approach to be adopted as soon as a soil pollution requires it. This pollution can be radioactive or chemical, and the case of a pollution going out of the installation is also included. Legal responsibility is outlined. The guide aims then at detailing the articulation between the various concerned and relevant documents for the management of a radioactive or chemical pollution related to the activities of a basic nuclear installation (BNI), and at detailing ASN expectations in this respect. Thus, it recalls the adopted management approach and methodological tools: diagnosis, interpretation of environment condition, management plan. It describes the approach related to soil sanitation: diagnosis, document to be produced, field and additional investigations, implementation of the reference approach for a complete removal of pollution, actions to be undertaken when the application of the reference approach is impossible, end of sanitation works. The third part discusses the methodology of soil sanitation by excavation by distinguishing three defence lines, by discussing the management of excavated soils (management modalities, warehousing within the installation). Administrative procedures to be applied before, during and after sanitation works are then presented. Specific management approaches are indicated for a BNI being operated or being dismantled. Actions of information are also indicated. Finally, requirements in terms of quality assurance are evoked

  18. Wind energy statistics 2011; Vindkraftsstatistik 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-01

    Wind energy statistics 2011 is the fifth publication in the annual series. The report's focus is on regional distribution, i e the number of plants and installed capacity allocated to counties and municipalities. The publication also reports a division between sea- and land-based plants and the size of wind farms in Sweden in terms of installed capacity. The publication is published in spring in report form and since 2010 statistics on number of plants, installed capacity, and regional distribution semi-annually are also presented on the Swedish Energy Agency's website. The statistics relating to installed capacity, number of wind farms and location in this publication is taken from the electricity certificate system, introduced in May 2003. Thanks to the electricity certificate system there is in principle comprehensive statistics of wind energy which in this publication is presented in different intersections. Statistics related to electricity production is taken from the Swedish Kraftnaets [Swedish national grid's] registry Cesar.

  19. NWTC Helps Guide U.S. Offshore R&D; NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-07-01

    The National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) is helping guide our nation's research-and-development effort in offshore renewable energy, which includes: Design, modeling, and analysis tools; Device and component testing; Resource characterization; Economic modeling and analysis; Grid integration.

  20. Guide related to the sanitation of structures in basic nuclear installations. Guide Nr 14, Release of 30 August 2016

    International Nuclear Information System (INIS)

    2016-01-01

    After having indicated the relevant regulatory texts and guides, this guide defines ASN recommendations for the sanitation methodology to be applied when, for example, some premises of buildings are subject to a change of use, are to be demolished, or are to be cleaned after events which occurred during operation. Some definitions are first specified: sanitation objective, verification criterion, singular point, structure, area. After having rather briefly recalled the general doctrine adopted for waste management in basic nuclear installations, the guide states the ASN doctrine regarding structure sanitation by presenting various concepts: complete sanitation, extensive sanitation, and sanitation during operation. It presents principles of sanitation of constituent structures of an area which may produce nuclear wastes (three defence lines are distinguished: thoughtful definition of sanitation modalities, confirmation of the conventional character of structures after sanitation, radiological control of any waste). Administrative procedures are then addressed: before sanitation works, during sanitation works, and after sanitation works (depending on the compatibility of structure radiological condition). Quality assurance requirements are evoked. The guide then describes the modalities of definition of the three different defence lines, and indicates requirements regarding sanitation works (control of contamination dissemination, conditions of intervention, case of civil engineering metallic structures, control of remaining structure elements). A peculiar case is briefly addressed: sanitation of removable structure elements. Appendices indicate the main themes addressed by the sanitation methodology, and by the sanitation assessment. A model sheet is proposed to specify the downgrading of a premise which was previously classified as an area of possible production of nuclear wastes

  1. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  2. What day-ahead reserves are needed in electric grids with high levels of wind power?

    International Nuclear Information System (INIS)

    Mauch, Brandon; Apt, Jay; Jaramillo, Paulina; Carvalho, Pedro M S

    2013-01-01

    Day-ahead load and wind power forecasts provide useful information for operational decision making, but they are imperfect and forecast errors must be offset with operational reserves and balancing of (real time) energy. Procurement of these reserves is of great operational and financial importance in integrating large-scale wind power. We present a probabilistic method to determine net load forecast uncertainty for day-ahead wind and load forecasts. Our analysis uses data from two different electric grids in the US with similar levels of installed wind capacity but with large differences in wind and load forecast accuracy, due to geographic characteristics. We demonstrate that the day-ahead capacity requirements can be computed based on forecasts of wind and load. For 95% day-ahead reliability, this required capacity ranges from 2100 to 5700 MW for ERCOT, and 1900 to 4500 MW for MISO (with 10 GW of installed wind capacity), depending on the wind and load forecast values. We also show that for each MW of additional wind power capacity for ERCOT, 0.16–0.30 MW of dispatchable capacity will be used to compensate for wind uncertainty based on day-ahead forecasts. For MISO (with its more accurate forecasts), the requirement is 0.07–0.13 MW of dispatchable capacity for each MW of additional wind capacity. (letter)

  3. A Response Surface-Based Cost Model for Wind Farm Design

    International Nuclear Information System (INIS)

    Zhang Jie; Chowdhury, Souma; Messac, Achille; Castillo, Luciano

    2012-01-01

    A Response Surface-Based Wind Farm Cost (RS-WFC) model is developed for the engineering planning of wind farms. The RS-WFC model is developed using Extended Radial Basis Functions (E-RBF) for onshore wind farms in the U.S. This model is then used to explore the influences of different design and economic parameters, including number of turbines, rotor diameter and labor cost, on the cost of a wind farm. The RS-WFC model is composed of three components that estimate the effects of engineering and economic factors on (i) the installation cost, (ii) the annual Operation and Maintenance (O and M) cost, and (iii) the total annual cost of a wind farm. The accuracy of the cost model is favorably established through comparison with pertinent commercial data. The final RS-WFC model provided interesting insights into cost variation with respect to critical engineering and economic parameters. In addition, a newly developed analytical wind farm engineering model is used to determine the power generated by the farm, and the subsequent Cost of Energy (COE). This COE is optimized for a unidirectional uniform “incoming wind speed” scenario using Particle Swarm Optimization (PSO). We found that the COE could be appreciably minimized through layout optimization, thereby yielding significant cost savings. - Highlights: ► We present a Response Surface-Based Wind Farm Cost (RS-WFC) model for wind farm design. ► The model could estimate installation cost, Operation and Maintenance cost, and total annual cost of a wind farm. ► The Cost of Energy is optimized using Particle Swarm Optimization. ► Layout optimization could yield significant cost savings.

  4. Main Coast Winds - Final Scientific Report

    Energy Technology Data Exchange (ETDEWEB)

    Jason Huckaby; Harley Lee

    2006-03-15

    The Maine Coast Wind Project was developed to investigate the cost-effectiveness of small, distributed wind systems on coastal sites in Maine. The restructuring of Maine's electric grid to support net metering allowed for the installation of small wind installations across the state (up to 100kW). The study performed adds insight to the difficulties of developing cost-effective distributed systems in coastal environments. The technical hurdles encountered with the chosen wind turbine, combined with the lower than expected wind speeds, did not provide a cost-effective return to make a distributed wind program economically feasible. While the turbine was accepted within the community, the low availability has been a negative.

  5. Protection of base nuclear installations against external flooding - Guide nr 13, release of the 08/01/2013

    International Nuclear Information System (INIS)

    2013-01-01

    As the French law requires the flooding risk to be taken into account in the demonstration of the nuclear safety of base nuclear installations (INB), this guide aims at defining situations to be taken into account when assessing the flooding risk for a site (identification of water sources and of flooding causes, definition of flooding situations), at proposing an acceptable method to quantify these situations (local rains, rise of water level, problems on hydraulic works, dam failure, ocean waves, and so on), and at listing recommendations to define the protection means which are adapted to the specificities of the flooding risk, and are implemented by the operator with respect to the installation lifetime

  6. Wind energy

    International Nuclear Information System (INIS)

    Kotevski, Darko

    2003-01-01

    Wind is not only free, it is inexhaustible. Wind energy has come a very long way since the prototypes of just 20 years ago. today's wind turbines are state-of-the-art technology - modular and quick to install anywhere where there is sufficient wind potential to provide secure, centralised or distributed generation. It is a global phenomenon, the world's fastest growing energy sector, a clean and effective modern technology that completely avoids pollution and thus reducing the 'green house' effect. (Original)

  7. Wind Power in Electrical Distribution Systems

    DEFF Research Database (Denmark)

    Chen, Zhe

    2013-01-01

    Recent years, wind power is experiencing a rapid growth, large number of wind turbines/wind farms have been installed and connected to power systems. In addition to the large centralised wind farms connected to transmission grids, many distributed wind turbines and wind farms are operated as dist...

  8. Brief communication: Structural monitoring for lifetime extension of offshore wind monopiles: can strain measurements at one level tell us everything?

    Directory of Open Access Journals (Sweden)

    L. Ziegler

    2017-09-01

    Full Text Available Operators need accurate knowledge on structural reserves to decide about lifetime extension of offshore wind turbines. Load monitoring enables us to directly compare design loads with real loading histories of the support structure in order to calculate its remaining useful lifetime. Monitoring of every hot spot is technically and financially not feasible. This paper presents a novel idea for load monitoring of monopiles. It requires strain measurements at only one level convenient for sensor installation, such as tower bottom. Measurements are converted into damage equivalent loads for 10 min time intervals. Damage equivalent loads are extrapolated to other locations of the structure with a simulation model and statistical algorithm. For this, structural loads at all locations of the monopile are calculated with aero-hydro-elastic software and updated finite element models. Damage equivalent loads at unmeasured locations are predicted from the simulation results with a k-nearest neighbor regression algorithm. The extrapolation was tested with numerical simulations of an 8 MW offshore wind turbine. Results show that damage can be predicted with an error of 1–3 % if this is done conditional on mean wind speed, which is very promising. The load monitoring concept is simple, cheap and easy to implement. This makes it ideal for making decisions on lifetime extension of monopiles.

  9. Applications of wind turbines in Canada

    Energy Technology Data Exchange (ETDEWEB)

    South, P; Rangi, R S; Templin, R J

    1977-01-01

    There are differing views as to the role of wind energy in the overall requirements. While some people tend to ignore it there are others who think that wind could be a major source of energy. In this paper an effort has been made to determine the wind power potential and also the amount that is economically usable. From the existing wind data a map showing the distribution of wind power density has been prepared. This map shows that the maritime provinces and the west coast of Hudson Bay have high wind power potential. These figures show that the wind power potential is of the same order as the installed electrical generating capacity in Canada (58 x 10/sup 6/kW in 1974). However, in order to determine how much of this power is usable the economics of adding wind energy to an existing system must be considered. A computer program has been developed at NRC to analyze the coupling of wind turbines with mixed power systems. Using this program and making certain assumptions about the cost of WECS and fuel the maximum amount of usable wind energy has been calculated. It is shown that if an installed capacity of 420 megawatts of wind power was added to the existing diesel capacity it would result in a savings of 60,000,000 gallons of fuel oil per year. On the other hand it is shown that if the existing installed hydro electric capacity of 37,000 megawatts (1976) was increased to 60,000 megawatts without increasing the average water flow rate, an installed capacity of 60,000 megawatts of wind power could be added to the system. This would result in an average of 14,000 megawatts from the wind. Using projected manufacturing costs for vertical axis wind turbines, the average cost of wind energy could be in the range of 1.4 cents/kwh to 3.6 cents/kwh.

  10. Why is China’s wind power generation not living up to its potential?

    Science.gov (United States)

    Huenteler, Joern; Tang, Tian; Chan, Gabriel; Diaz Anadon, Laura

    2018-04-01

    Following a decade of unprecedented investment, China now has the world’s largest installed base of wind power capacity. Yet, despite siting most wind farms in the wind-rich Northern and Western provinces, electricity generation from Chinese wind farms has not reached the performance benchmarks of the United States and many other advanced economies. This has resulted in lower environmental, economic, and health benefits than anticipated. We develop a framework to explain the performance of the Chinese and US wind sectors, accounting for a comprehensive set of driving factors. We apply this framework to a novel dataset of virtually all wind farms installed in China and the United States through the end of 2013. We first estimate the wind sector’s technical potential using a methodology that produces consistent estimates for both countries. We compare this potential to actual performance and find that Chinese wind farms generated electricity at 37%–45% of their annual technical potential during 2006–2013 compared to 54%–61% in the United States. Our findings underscore that the larger gap between actual performance and technical potential in China compared to the United States is significantly driven by delays in grid connection (14% of the gap) and curtailment due to constraints in grid management (10% of the gap), two challenges of China’s wind power expansion covered extensively in the literature. However, our findings show that China’s underperformance is also driven by suboptimal turbine model selection (31% of the gap), wind farm siting (23% of the gap), and turbine hub heights (6% of the gap)—factors that have received less attention in the literature and, crucially, are locked-in for the lifetime of wind farms. This suggests that besides addressing grid connection delays and curtailment, China will also need policy measures to address turbine siting and technology choices to achieve its national goals and increase utilization up to US levels.

  11. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  12. Current R and D needs in wind energy technology

    International Nuclear Information System (INIS)

    Maribo Pedersen, B.

    1995-01-01

    The meeting, hosted by NOVEM, the Netherlands Agency for Energy and the Environment, was attended by 22 people. The purpose of the meeting was to get an impression of how far the efforts spent until now on worldwide research and development have brought the general understanding of, and possibly solutions to, the various problems within wind energy technology - thereby providing some guidance as to where to go from now. In 1994 it was estimated that more than 100 million U.S. dollars was spent on R, D and D by those OECD countries which have a wind energy program, and that since 1974 at least 1000 mil. U.S. dollars must have been spent. The necessity of continued basic research within certain areas was recognized, and it was emphasized that the size of the research teams should always be greater than 'the critical mass'. There seemed to be consensus among all participants that the areas for continued research were the following: aerodynamics, aeroelasticity and load calculations, aeroacoustics (verification of fatigue calculation procedures for 3D stress distribution, establishing a data base of material properties), lightning protection measures, offshore installations (combined wind/wave loading, dynamics of support structures, wind and turbulence over the open sea), power conversion and wind turbine - grid interaction. (EG)

  13. ASN guide project. Safety policy and management in INBs (base nuclear installations)

    International Nuclear Information System (INIS)

    2010-01-01

    This guide presents the recommendations of the French Nuclear Safety Authority (ASN) in the field of safety policy and management (PMS) for base nuclear installations (INBs). It gives an overview and comments of some prescriptions of the so-called INB order and PMS decision. These regulatory texts define a framework for provisions any INB operator must implement to establish his safety policy, to define and implement a system which allows the safety to be maintained, the improvement of his INB safety to be permanently looked for. The following issues are addressed: operator's safety policy, identification of elements important for safety, of activities pertaining to safety, and of associated requirements, safety management organization and system, management of activities pertaining to safety, documentation and archiving

  14. Wind energy in Mediterranean Basin

    International Nuclear Information System (INIS)

    Gaudiosi, G.

    1991-01-01

    In its examination of wind energy potential in the Mediterranean Basin, this paper provides brief notes on the Basin's geography; indicates power production and demand; describes the area's wind characteristics and wind monitoring activities; illustrates wind velocity distributions; estimates local wind power production potential; reviews the Basin's wind energy marketing situation and each bordering country's wind energy programs; surveys installed wind energy farms; and assesses national research and commercialization efforts

  15. The influence of a cubic building on a roof mounted wind turbine

    International Nuclear Information System (INIS)

    Micallef, Daniel; Sant, Tonio; Ferreira, Carlos

    2016-01-01

    The performance of a wind turbine located above a cubic building is not well understood. This issue is of fundamental importance for the design of small scale wind turbines. One variable which is of particular importance in this respect is the turbine height above roof level. In this work, the power performance of a small wind turbine is assessed as a function of the height above the roof of a generic cubic building. A 3D Computational Fluid Dynamics model of a 10m x 10m x 10m building is used with the turbine modelled as an actuator disc. Results have shown an improvement in the average power coefficient even in cases where the rotor is partially located within the roof separation zone. This goes against current notions of small wind turbine power production. This study can be of particular importance to guide the turbine installation height on building roof tops. (paper)

  16. Flow separation on wind turbines blades

    NARCIS (Netherlands)

    Corten, G.P.

    2001-01-01

    In the year 2000, 15GW of wind power was installed throughout the world, producing 100PJ of energy annually. This contributes to the total electricity demand by only 0.2%. Both the installed power and the generated energy are increasing by 30% per year world-wide. If the airflow over wind turbine

  17. Financial Innovation Among the Community Wind Sector in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark

    2011-01-19

    In the relatively brief history of utility-scale wind generation, the 'community wind' sector - defined here as consisting of relatively small utility-scale wind power projects that are at least partly owned by one or more members of the local community - has played a vitally important role as a 'test bed' or 'proving ground' for wind turbine manufacturers. In the 1980s and 1990s, for example, Vestas and other now-established European wind turbine manufacturers relied heavily on community wind projects in Scandinavia and Germany to install - and essentially field-test - new turbine designs. The fact that orders from community wind projects seldom exceeded more than a few turbines at a time enabled the manufacturers to correct any design flaws or manufacturing defects fairly rapidly, and without the risk of extensive (and expensive) serial defects that can accompany larger orders. Community wind has been slower to take root in the United States - the first such projects were installed in the state of Minnesota around the year 2000. Just as in Europe, however, the community wind sector in the U.S. has similarly served as a proving ground - but in this case for up-and-coming wind turbine manufacturers that are trying to break into the broader U.S. wind power market. For example, community wind projects have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010),1 Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Just as it has provided a proving ground for new turbines, so too has the community wind sector in the United States served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the 'partnership flip structure' - was first developed by

  18. The wind energy in danger in France

    International Nuclear Information System (INIS)

    2005-03-01

    The law project of march 2005, concerning the energy policy in France is dangerous for the wind power development. The new regulation favor the big installations in order to protect the environment. In fact this decision will limit the wind turbines installations. (A.L.B.)

  19. Investigation of wind turbine effects on Evapotranspiration using surface energy balance model based on satellite-derived data

    Science.gov (United States)

    hassanpour Adeh, E.; Higgins, C. W.

    2014-12-01

    Wind turbines have been introduced as an energy source that does not require a large expenditure of water. However, recent simulation results indicate that wind turbines increase evaporation rates from the nearby land. In this research the effect of wind energy on irrigated agriculture is determined using a Surface Energy Balance Algorithm (SEBAL) on Landsat data spanning a 30 year interval. The analysis allows the characterization of evapotranspiration (ET) before and after wind turbine installations. The time history of ET from Landsat data will be presented for several major wind farms across the US. These data will be used to determine the impact on water demand due to presence of wind turbines.

  20. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  1. Wind Data Analysis and Wind Flow Simulation Over Large Areas

    Directory of Open Access Journals (Sweden)

    Terziev Angel

    2014-03-01

    Full Text Available Increasing the share of renewable energy sources is one of the core policies of the European Union. This is because of the fact that this energy is essential in reducing the greenhouse gas emissions and securing energy supplies. Currently, the share of wind energy from all renewable energy sources is relatively low. The choice of location for a certain wind farm installation strongly depends on the wind potential. Therefore the accurate assessment of wind potential is extremely important. In the present paper an analysis is made on the impact of significant possible parameters on the determination of wind energy potential for relatively large areas. In the analysis the type of measurements (short- and long-term on-site measurements, the type of instrumentation and the terrain roughness factor are considered. The study on the impact of turbulence on the wind flow distribution over complex terrain is presented, and it is based on the real on-site data collected by the meteorological tall towers installed in the northern part of Bulgaria. By means of CFD based software a wind map is developed for relatively large areas. Different turbulent models in numerical calculations were tested and recommendations for the usage of the specific models in flows modeling over complex terrains are presented. The role of each parameter in wind map development is made. Different approaches for determination of wind energy potential based on the preliminary developed wind map are presented.

  2. International Symposium on Wind Energy Systems, 4th, Stockholm, Sweden, September 21-24, 1982, Proceedings. Volumes 1 & 2

    Science.gov (United States)

    Stephens, H. S.; Goodes, D. H.

    Progress in theoretical, meteorological, and hardware development sectors of wind energy utilization is assessed for various national programs. Wind regime characterization studies in Agentina, China, Indonesia, Norway, the U.S., Canada, Sweden, Hawaii, and offshore of the U.K. are reported. Data gained from wind turbine test sites in the U.S., Denmark, Holland, Germany, and the Netherlands are outlined. Attention is focused on the economics of wind turbine production for utility, agricultural, and third party purposes, with mention made of utilizing the resource appropriately for areas of installation of the wind powered machinery. Analyses are made of diurnal wind variations compared to diurnal demands on conventinal electricity generating power stations. Performance projections are made for wind farms featuring multi-MW machines, taking into account grid inteconnection factors, electrical control, power ramps, and environmental considerations. Mention is made of aeroelastics, dynamics, and the aerodynamics of wind turbines and rotor blades. Finally, icing, noise, fatigue failure, and blade throw problem are discussed, together with wind turbine licensing procedures in Denmark. No invidivual items are abstracted in these volumes

  3. Hywind floating wind turbine project

    Energy Technology Data Exchange (ETDEWEB)

    Crome, Tim

    2010-07-01

    The Hywind floating wind turbine concept was developed by StatoilHydro. Technip was awarded the contract for engineering, fabrication and installation of a demonstration unit in May 2008 and the completed wind turbine was installed mid June 2009 at the west coast of Norway on 220 m water depth. The demonstration unit will generate 2,3 MW and is equipped with instrumentation for monitoring mooring forces, strains and motions. The fabrication of the SPAR type steel substructure was performed at Technip Offshore Finland facilities in Pori and was towed horizontally from Finland to Norway, where it was upended to a vertical position by water filling. The completed floating wind turbine was towed vertically to the final location west of Karmoey and connected to the pre-installed three legged anchor system using an Anchor Handling Tug type vessel. The wind turbine test period is scheduled to start in September 2009. Statoil will monitor the performance of the system for two years before decision will be taken for further development. The paper will present the main challenges and lessons learned through design, fabrication and installation of this first of its kind structure. Main emphasis will be on the special challenges experienced for this floating, catenary moored, slender unit which is highly exposed for wind induced forces in addition to current and waves in hostile North Sea environments. (Author)

  4. A spinner-integrated wind lidar for enhanced wind turbine control

    DEFF Research Database (Denmark)

    Mikkelsen, Torben; Angelou, Nikolas; Hansen, Kasper Hjorth

    2013-01-01

    A field test with a continuous wave wind lidar (ZephIR) installed in the rotating spinner of a wind turbine for unimpeded preview measurements of the upwind approaching wind conditions is described. The experimental setup with the wind lidar on the tip of the rotating spinner of a large 80 m roto...... of the spinner lidar data, is investigated. Finally, the potential for enhancing turbine control and performance based on wind lidar preview measurements in combination with feed-forward enabled turbine controllers is discussed. Copyright © 2012 John Wiley & Sons, Ltd....

  5. Small scale wind power harnessing in Colombian oil industry facilities: Wind resource and technology issues

    Energy Technology Data Exchange (ETDEWEB)

    Giraldo, Mauricio; Nieto, Cesar; Escudero, Ana C.; Cobos, Juan C.; Delgado, Fernando

    2010-07-01

    Full text: Looking to improve its national and international standing, Colombia's national oil company, Ecopetrol, has set its goal on becoming involved on the production of energy from multiple sources, most importantly, on having an important percentage of its installed capacity from renewable sources. Part of this effort entices the evaluation of wind power potential on its facilities, including production, transportation and administrative, as well as identifying those technologies most suitable for the specific conditions of an equatorial country such as Colombia. Due to the lack of adequate site information, the first step consisted in superimposing national data to the facilities map of the company; this allowed for the selection of the first set of potential sites. From this set, the terminal at Covenas-Sucre was selected taking into account not only wind resource, but ease of access and power needs, as well as having a more or less representative wind potential in comparison to the rest of the country. A weather station was then installed to monitor wind variables. Measurements taken showed high variations in wind direction, and relatively low velocity profiles, making most commercially available wind turbines difficult to implement. In light of the above, a series of iterative steps were taken, first considering a range of individual Vertical Axis Wind Turbines (VAWT), given their capacity to adapt to changing wind directions. However, wind speed variations proved to be a challenge for individual VAWT's, i.e. Darriues turbines do not work well with low wind speeds, and Savonius turbines are not efficient of high wind speeds. As a result, a combined Darrieus- Savonius VAWT was selected given the capacity to adapt to both wind regimes, while at the same time modifying the size and shape of the blades in order to adapt to the lower average wind speeds present at the site. The resulting prototype is currently under construction and is scheduled to

  6. The Current Situation of Wind Energy in Turkey

    Directory of Open Access Journals (Sweden)

    Raşit Ata

    2013-01-01

    Full Text Available Wind energy applications and turbine installations at different scales have increased since the beginning of this century. As wind energy is an alternative clean energy source compared to the fossil fuels that pollute the atmosphere, systems that convert wind energy to electricity have developed rapidly. Turkey’s domestic fossil fuel resources are extremely limited. In addition, Turkey’s geographical location has several advantages for extensive use of wind power. In this context, renewable energy resources appear to be one of the most efficient and effective solutions for sustainable energy development and environmental pollution prevention in Turkey. Among the renewable sources, Turkey has very high wind energy potential. According to the Organization for Economic Cooperation and Development (OECD Turkey theoretically has 166 TWh a year of wind potential. However the installed wind power capacity is approximately 14% of total economical wind potential. In this study, Turkey’s installed electric power capacity and electric energy production are investigated and also the current situation of wind energy in Turkey is examined. The wind data used in this study were taken from Turkish Wind Energy Association (TUREB for the year 2012. This paper reviews the assessment of wind energy in Turkey as of the end of July 2012 including wind energy applications.

  7. A numerical study on manoeuvrability of wind turbine installation vessel using OpenFOAM

    Directory of Open Access Journals (Sweden)

    Sungwook Lee

    2015-05-01

    Full Text Available In this study, a numerical prediction method on manoeuvrability of Wind Turbine Installation Vessel (WTIV is presented. Planar Motion Mechanism (PMM captive test for the bare hull of WTIV is carried out in the model basin and compared with the numerical results using RANS simulation based on Open-source Field Operation And Manipulation (OpenFOAM calculation to validate the developed method. The manoeuvrability of WTIV with skeg and/or without skeg is investigated using the numerical approach along with the captive model test. In the numerical calculations, the dynamic stability index which indicates the course keeping ability is evaluated and compared for three different hull configurations i.e. bare hull and other two hulls with center skeg and twin skeg. This paper proves that the numerical approach using RANS simulation can be readily applied to estimate the manoeuvrability of WTIV at the initial design stage.

  8. Practical experience and economic aspects of small wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    Workshop proceedings presented cover operating experience and development of wind turbines installed in the UK by Northern Engineering Industries plc companies, the Howden aerogenerator installed in Orkney, and the commissioning of a vertical-axis generator in a remote location. The National Wind Turbine Test Centre, the Caithness Wind Project, the South of Scotland Electricity Board's activities, economics of small scale wind power and commercialisation are discussed.

  9. Assessing high wind energy penetration

    DEFF Research Database (Denmark)

    Tande, J.O.

    1995-01-01

    In order to convincingly promote installing wind power capacity as a substantial part of the energy supply system, a set of careful analyses must be undertaken. This paper applies a case study concentrated on assessing the cost/benefit of high wind energy penetration. The case study considers...... expanding the grid connected wind power capacity in Praia, the capital of Cape Verde. The currently installed 1 MW of wind power is estimated to supply close to 10% of the electric energy consumption in 1996. Increasing the wind energy penetration to a higher level is considered viable as the project...... with the existing wind power, supply over 30% of the electric consumption in 1996. Applying the recommended practices for estimating the cost of wind energy, the life-cycle cost of this 2.4 MW investment is estimated at a 7% discount rate and a 20 year lifetime to 0.26 DKK/kW h....

  10. Articulated, Performance-Based Instruction Objectives Guide for Air Conditioning, Refrigeration, and Heating (Environmental Control System Installer/Servicer). Edition I.

    Science.gov (United States)

    Henderson, William Edward, Jr., Ed.

    This articulation guide contains 17 units of instruction for the first year of a two-year vocational program designed to prepare the high school graduate to install, maintain, and repair various types of residential and commercial heating, air conditioning, and refrigeration equipment. The units are to introduce the student to fundamental theories…

  11. Mastering the power of wind

    International Nuclear Information System (INIS)

    Stiegel, J.

    1999-01-01

    In this paper the author deals with environmental aspects use of fossil fuels for the energy production. As a way for our planet to get back to a normal and ecologically balanced system the fossil fuels reduction and their replacement by renewable racecourses is recommended. Energetic potential of flowing sun, wind and tidal waves as power resources is discussed. The natural ecological resources are best utilised in the United States where the installed wind power output is 1600 MW. With 360 MW installed output in 1991 the Denmark took lead among European countries in utilising the wind power. The most dynamic power plant development among the European Union countries was recorded in Germany, where the installed power output of the wind power plants is 632 MW, i.e. i.e. 11.5 times higher compared to 55 MW in 1991. The economy of wind power in Germany and in Slovakia is compared. In Slovakia with annual 200 000 kWh power generation annually and the present kWh purchase price guarantee the rate of return of 10 million slovak crowns investment into a wind power plant project is in 100 years. Although the first wind power plants have already been built in the Zahorie, Kremnicke Bane, and Secovce regions, the wind exploitation status in Slovakia is still limping. According to professionals, the wind conditions in Slovakia are not ideal, but sufficient for a supplementary wind power plant system, that can be quite motivating especially for villages. Mount Chopok or mount Krizna are ideal sites to erect the three-blade tower with respect to wind speed. And also the anticipated Kremnicke vrchy site is worth considering. (author)

  12. International wind energy development. World market update 2000. Forecast 2001-2005

    International Nuclear Information System (INIS)

    2001-03-01

    In the year 2000, the wind power development took another major step forward. Installed capacity set a new record with the additon of 4,495 MW of new generating capacity, this is 574 MW more than the record set in 1999. Growth in new capacity declined from 51% in 1999 to 15% in 2000. Nevertheless, the trend of wind energy being preferred over other technologies for new generating capacity is continuing. Europe remains the major market for wind power. Of the new capacity added in 2000, 86% was installed in Europe. Germany again took the lead as the single most active market with the installation of 1,665 MW in new capacity, 100 MW more than in the previous year. In doing so, Germany extended its reign as the world's leading developer of wind energy. Spain also took a major step towards meeting its renewable energy goals with the installation of some 1,024 MW of new wind generating capacity. Denmark replaced the United States as the world's third largest market. The Danes installed a new record of 603 MW. This was due to a last-minute rush of contracts signed at the end of 1999 in order to utilize attractive payment rates for new installations, which expired at the end of the year. The turbines were then installed in 2000. Market leaders among wind turbine manufacturers changed from previous years. Vestas Wind Systems A/S is now the world's largest manufacturer of wind turbines, followed by Gamesa S.A. of Spain (Vestas owns 40% of the shares in the Spanish company). Enercon GmbH has become the third largest manufacturer of wind turbines. It is interesting to note that Enercon GmbH made steady progress in sales to several emerging markets throughout the world. New on the Top-10 list is an Indian manufacturer. Suzlon Energy Ltd. installed 103 MW of capacity and thereby becomes the number 10 in the list of the worlds largest manufacturer. The cumulative installed capacity of 18,449 MW at the end of 2000 will supply approximately 37 TWh (37 billion kWh) per year. The

  13. Wind Power in Australia: Overcoming Technological and Institutional Barriers

    Science.gov (United States)

    Healey, Gerard; Bunting, Andrea

    2008-01-01

    Until recently, Australia had little installed wind capacity, although there had been many investigations into its potential during the preceding decades. Formerly, state-owned monopoly utilities showed only token interest in wind power and could dictate the terms of energy debates. This situation changed in the late 1990s: Installed wind capacity…

  14. The future of utility-scale wind power

    International Nuclear Information System (INIS)

    Hock, S.; Thresher, R.; Williams, T.

    1992-01-01

    The U.S. Department of Energy (DOE) estimates that by 2030, wind power could potentially displace between 3 and 4 quadrillion (10 15 ) Btus (quads) of primary energy, with an installed electrical generation capacity of 120,000 to 160,000 MW. This forecast is based upon economic analyses indicating that the costs of wind-generated electricity could be cost competitive with conventional fossil-fuel-based generation by early next century. The key to realizing this objective is overcoming technical challenges to the development of a next-generation of advanced wind turbines. These challenges include the detailed characterization of wind inflow to turbines at wind-power-plant sites, an understanding of unsteady aerodynamics, the development of sophisticated computer models of all aspects of turbine operation, and the application of a better understanding of component and system fatigue to new designs. Advanced wind systems will include such new technologies as blade designs incorporating advanced airfoils and new materials, variable-speed operation, advanced power electronics, rotor-hub enhancements, tall towers, aerodynamic controls, advanced drive trains, and expert control systems. A larger market share for wind energy will also require the resolution of issues surrounding transmission, storage, and the integration of an intermittent energy source into the utility grid

  15. Design and fabrication of a low cost Darrieus vertical axis wind turbine system: Phase 2, volume 1: Executive summary

    Science.gov (United States)

    1983-03-01

    Described is the successful fabrication, installation, and checkout of 100 kW 17 meter Vertical Axis Wind Turbines (VAWTs). The turbines are Darrieus-type VAWTs with rotors 17 meters (55 feet) in diameter and 25.15 meters (83 feet) in height. They can produce 100 kW of electric power at a cost of energy as low as 3 cents per kWh, in an 18 mph wind regime using 12% annualized costs. Four turbines were produced; three are installed and are operable at: (1) Wind Systems Test Center, Rocky Flats, Colorado; (2) the US Department of Agriculture Conservation and Production Research Center at Bushland, Texas; and (3) Tisbury Water Authority, Vineyard Haven, Massachusetts, on the island of Martha's Vineyard. The fourth turbine is stored at Bushland, Texas awaiting selection of an erection site.

  16. Preliminary Assessment of Potential Avian Interactions at Four Proposed Wind Energy Facilities on Vandenberg Air Force Base, California

    Energy Technology Data Exchange (ETDEWEB)

    2004-08-01

    The United States Air Force (USAF) is investigating whether to install wind turbines to provide a supplemental source of electricity at Vandenberg Air Force Base (VAFB) near Lompoc, California. As part of that investigation, VAFB sought assistance from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to provide a preliminary characterization of the potential risk to wildlife resources (mainly birds and bats) from wind turbine installations. With wind power development expanding throughout North America and Europe, concerns have surfaced over the number of bird fatalities associated with wind turbines. Guidelines developed for the wind industry by the National Wind Coordinating Committee (NWCC) recommend assessing potential impacts to birds, bats, and other potentially sensitive resources before construction. The primary purpose of an assessment is to identify potential conflicts with sensitive resources, to assist developers with identifying their permitting needs, and to develop strategies to avoid impacts or to mitigate their effects. This report provides a preliminary (Phase I) biological assessment of potential impacts to birds and bats that might result from construction and operation of the proposed wind energy facilities on VAFB.

  17. Wind Energy Guide.

    Science.gov (United States)

    Harrison, David

    The booklet, intended for students and other visitors to the Lathrop E. Smith Environmental Education Center (Rockville, Maryland), explains how windmills work and their economic and environmental advantages. The history of windmills in Europe and Asia is briefly described, as well as the history of windmills and wind generators (for electricity)…

  18. An integrated audio-visual impact tool for wind turbine installations

    International Nuclear Information System (INIS)

    Lymberopoulos, N.; Belessis, M.; Wood, M.; Voutsinas, S.

    1996-01-01

    An integrated software tool was developed for the design of wind parks that takes into account their visual and audio impact. The application is built on a powerful hardware platform and is fully operated through a graphic user interface. The topography, the wind turbines and the daylight conditions are realised digitally. The wind park can be animated in real time and the user can take virtual walks in it while the set-up of the park can be altered interactively. In parallel, the wind speed levels on the terrain, the emitted noise intensity, the annual energy output and the cash flow can be estimated at any stage of the session and prompt the user for rearrangements. The tool has been used to visually simulate existing wind parks in St. Breok, UK and Andros Island, Greece. The results lead to the conclusion that such a tool can assist to the public acceptance and licensing procedures of wind parks. (author)

  19. Validation of US3D for Capsule Aerodynamics using 05-CA Wind Tunnel Test Data

    Science.gov (United States)

    Schwing, Alan

    2012-01-01

    Several comparisons of computational fluid dynamics to wind tunnel test data are shown for the purpose of code validation. The wind tunnel test, 05-CA, uses a 7.66% model of NASA's Multi-Purpose Crew Vehicle in the 11-foot test section of the Ames Unitary Plan Wind tunnel. A variety of freestream conditions over four Mach numbers and three angles of attack are considered. Test data comparisons include time-averaged integrated forces and moments, time-averaged static pressure ports on the surface, and Strouhal Number. The applicability of the US3D code to subsonic and transonic flow over a bluff body is assessed on a comprehensive data set. With close comparison, this work validates US3D for highly separated flows similar to those examined here.

  20. Modeling and Simulation of a 12 MW Wind Farm

    Directory of Open Access Journals (Sweden)

    GROZA, V.

    2010-05-01

    Full Text Available The installation of wind turbines in power systems has developed rapidly through the last 20 years. In this paper a complete simulation model of a 6 x 2 MW wind turbines is presented using data from a wind farm installed in Denmark. A model of the wind turbine with cage-rotor induction generator is presented in details. A set of simulations are performed and they show that it is possible to simulate a complete wind farm from wind to the grid. The simulation tool can also be used to simulate bigger wind farms connected to the grid.

  1. Finance and banking for wind energy

    Energy Technology Data Exchange (ETDEWEB)

    Rave, Klaus [Investitionsbank Schleswig-Holstein (Germany)

    1999-01-01

    Installed wind power capacity in Schleswig-Holstein has grown from 2 MW in 1988 to about 600 MW in 1997; about 10% of the total power demand. The target of 20 to 25% by 2010 should easily be exceeded. Cost per kW of installed capacity has fallen from DM 3,350 in 1990 to DM 1,700 in 1997. Estimates for the world market for wind power are given. Criteria for evaluating the financing of a build, operate, transfer wind energy project are set out. (uk)

  2. Finance and banking for wind energy

    Energy Technology Data Exchange (ETDEWEB)

    Rave, Klaus [Investitionsbank Schleswig-Holstein (Germany)

    1999-04-01

    Installed wind power capacity in Schleswig-Holstein has grown from 2 MW in 1988 to about 600 MW in 1997; about 10% of the total power demand. The target of 20 to 25% by 2010 should easily be exceeded. Cost per kW of installed capacity has fallen from DM 3,350 in 1990 to DM 1,700 in 1997. Estimates for the world market for wind power are given. Criteria for evaluating the financing of a build, operate, transfer wind energy project are set out. (uk)

  3. A status report on international utility-scale wind energy markets

    Energy Technology Data Exchange (ETDEWEB)

    Rackstraw, K.; Vaupen, S. [American Wind Energy Association, Washington, DC (United States)

    1997-12-31

    AWEA`s latest ten-year projections for new installations of utility-scale wind turbines show nearly 30,000 new megawatts (MW) should be installed between the years 1997 and 2006. The study also briefly explores the potential impact of a significant event, such as a fossil fuel price spike or a strong move to slow global climate change, that could double installed new wind capacity to nearly 60,000 MW over the same period. This outlook is substantially more optimistic than last year`s (about 20,000 MW), but the numbers are somewhat skewed by rolling the outlook forward one year. In other words, the new projections cover a ten-year period beginning one year later than last year`s study. The skewing is a result of substituting the lowest year in last year`s study with the highest year in the new ten-year period (2006), when far more capacity additions can be expected. In addition, AWEA has adjusted upward the numbers for some countries, most notably Germany, Denmark, Spain, Italy, China and the US. Last year`s projections were decidedly, and purposefully, conservative but trends are such that greater optimism about future markets is justified.

  4. Wind energy in Europe

    International Nuclear Information System (INIS)

    Evans, L.C.

    1992-01-01

    Wind energy should be an important part of the energy supply mix, both at home and abroad, to provide cleaner air and a more stable fuel supply. Not only can wind energy contribute to solving complex global issues, it also can provide a large market for American technological leadership. Even though utilities are paying more attention to wind in a number of states, there are no plans for major installations of wind power plants in the United States. At the same time, European nations have developed aggressive wind energy development programs, including both ambitious research and development efforts and market incentives. Many countries recognize the importance of the clean energy provided by wind technology and are taking steps to promote their fledgling domestic industries. The emphasis on market incentives is starting to pay off. In 1991, European utilities and developers installed nearly twice as much wind capacity as Americans did. In 1992 the gap will be even greater. This article reviews aggressive incentives offered by European governments to boost their domestic wind industries at home and abroad in this almost $1 billion per year market. By offering substantial incentives - considerably more than the American Wind Energy Association (AWEA) is proposing - European nations are ensuring dramatic near-term wind energy development and are taking a major step toward dominating the international wind industry of the 21st century

  5. U.S. Navy Aeromedical Reference and Waiver Guide

    Science.gov (United States)

    2010-05-05

    Passion flower) – Piper methysticum (Kava-Kava) – Psilocybe semilanceata (magic mushrooms) – Rauwolfia serpentina (Indian snakeroot) – Rauwolfia... serpentina (Indian Snakeroot) – Scilla maritima (White Squill) – Scopolia carniolica (Scopolia)* U.S. Navy Aeromedical Reference and Waiver Guide...be sedatives: – Valeriana officinalis (Valerian) – Rauwolfia serpentina (Indian snakeroot) – Atropa belladonna (Deadly Nightshade)* – Chelidonium

  6. ASN guide project: complete cleaning-up modalities acceptable in nuclear base installations in France - ASN guide project nr 14 - Release of 21/06/2010

    International Nuclear Information System (INIS)

    2010-01-01

    As any nuclear base installation evolves during its exploitation, some premises or buildings may change of use or be destroyed. In the first case, a complete cleaning up might be necessary to get rid of radioactive products. In order to deal with this issue, after a brief recall of the regulatory context and references, and a recall of the general doctrine of waste management in nuclear base installations in France, this guide project presents the principles for a complete cleaning up of structures belonging to an area containing nuclear wastes. It describes the modalities of definition of three different and successive defence lines. It defines the requirements in performing cleaning-up operations, the requirements in terms of quality insurance, and the different administrative procedures (before, during and after cleaning-up works). Some particular cases are addressed

  7. Considering wind energy in regional planning guidelines and communal land-use planning; Die Beruecksichtigung der Windenergie in der Richt- und Nutzungsplanung

    Energy Technology Data Exchange (ETDEWEB)

    Soguel, R. [Atelier North and Robyr, Neuchatel (Switzerland); Henz, H.R. [Metron Raumplanung AG, Brugg (Switzerland)

    2001-07-01

    This report made for the Swiss Federal Office of Energy (SFOE) discusses the situation in Switzerland regarding the planning guidelines required at regional and communal level that are required for the granting of permission to build wind energy installations. Various types of wind turbines and wind farms are described and topics such as planning tools, landscape protection and promotional concepts are discussed. The role of the Swiss Cantons in the promotion of wind energy is examined and the question of how to integrate wind energy plant into cantonal and communal planning guidelines is looked at. This working guide introduces two schemes that demonstrate how the planning process for the construction of wind farms can be co-ordinated with the development of land-use plans. Examples of current cantonal guidelines are presented in the appendix to the report.

  8. Power Quality Issues on Wind Power Installations in Denmark

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Lund, Torsten

    2007-01-01

    offshore wind farms connected at transmission level. In this perspective, the power quality issues are divided into local issues particularly related to the voltage quality in the distribution systems and global issues related to the power system control and stability. Power quality characteristics of wind...

  9. Distributed Wind Resource Assessment: State of the Industry

    Energy Technology Data Exchange (ETDEWEB)

    Fields, Jason [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tinnesand, Heidi [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-06-01

    In support of the U.S. Department of Energy (DOE) Wind and Water Power Technologies Office (WWPTO) goals, researchers from DOE's National Renewable Energy Laboratory (NREL), National Wind Technology Center (NWTC) are investigating the Distributed Wind Resource Assessment (DWRA) process, which includes pre-construction energy estimation as well as turbine site suitability assessment. DWRA can have a direct impact on the Wind Program goals of maximizing stakeholder confidence in turbine performance and safety as well as reducing the levelized cost of energy (LCOE). One of the major components of the LCOE equation is annual energy production. DWRA improvements can maximize the annual energy production, thereby lowering the overall LCOE and improving stakeholder confidence in the distributed wind technology sector by providing more accurate predictions of power production. Over the long term, one of the most significant benefits of a more defined DWRA process could be new turbine designs, tuned to site-specific characteristics that will help the distributed wind industry follow a similar trajectory to the low-wind-speed designs in the utility-scale industry sector. By understanding the wind resource better, the industry could install larger rotors, capture more energy, and as a result, increase deployment while lowering the LCOE. a direct impact on the Wind Program goals of maximizing stakeholder confidence in turbine performance and safety as well as reducing the levelized cost of energy (LCOE). One of the major components of the LCOE equation is annual energy production. DWRA improvements can maximize the annual energy production, thereby lowering the overall LCOE and improving stakeholder confidence in the distributed wind technology sector by providing more accurate predictions of power production. Over the long term, one of the most significant benefits of a more defined DWRA process could be new turbine designs, tuned to site-specific characteristics that

  10. Next Generation Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Cheraghi, S. Hossein [Western New England Univ., Springfield, MA (United States); Madden, Frank [FloDesign Wind Turbine Corp., Waltham, MA (United States)

    2012-09-01

    The goal of this collaborative effort between Western New England University's College of Engineering and FloDesign Wind Turbine (FDWT) Corporation to wok on a novel areodynamic concept that could potentially lead to the next generation of wind turbines. Analytical studies and early scale model tests of FDWT's Mixer/Ejector Wind Turbine (MEWT) concept, which exploits jet-age advanced fluid dynamics, indicate that the concept has the potential to significantly reduce the cost of electricity over conventional Horizontal Axis Wind Turbines while reducing land usage. This project involved the design, fabrication, and wind tunnel testing of components of MEWT to provide the research and engineering data necessary to validate the design iterations and optimize system performance. Based on these tests, a scale model prototype called Briza was designed, fabricated, installed and tested on a portable tower to investigate and improve the design system in real world conditions. The results of these scale prototype efforts were very promising and have contributed significantly to FDWT's ongoing development of a product scale wind turbine for deployment in multiple locations around the U.S. This research was mutually beneficial to Western New England University, FDWT, and the DOE by utilizing over 30 student interns and a number of faculty in all efforts. It brought real-world wind turbine experience into the classroom to further enhance the Green Engineering Program at WNEU. It also provided on-the-job training to many students, improving their future employment opportunities, while also providing valuable information to further advance FDWT's mixer-ejector wind turbine technology, creating opportunities for future project innovation and job creation.

  11. Alcoa wind turbines

    Science.gov (United States)

    Ai, D. K.

    1979-01-01

    An overview of Alcoa's wind energy program is given with emphasis on the the development of a low cost, reliable Darrieus Vertical Axis Wind Turbine System. The design layouts and drawings for fabrication are now complete, while fabrication and installation to utilize the design are expected to begin shortly.

  12. Wind power price trends in the United States: Struggling to remain competitive in the face of strong growth

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan

    2009-01-01

    The amount of wind power capacity being installed globally is surging, with the United States the world leader in terms of annual market share for three years running (2005-2007). The rapidly growing market for wind has been a double-edged sword, however, as the resulting supply-demand imbalance in wind turbines, along with the rising cost of materials and weakness in the US dollar, has put upward pressure on wind turbine costs, and ultimately, wind power prices. Two mitigating factors-reductions in the cost of equity provided to wind projects and improvements in project-level capacity factors-have helped to relieve some of the upward pressure on wind power prices over the last few years. Because neither of these two factors can be relied upon to further cushion the blow going forward, policymakers should recognize that continued financial support may be necessary to sustain the wind sector at its current pace of development, at least in the near term. Though this article emphasizes developments in the US market for wind power, those trends are similar to, and hold implications for, the worldwide wind power market

  13. Wind - the fuel of the future

    International Nuclear Information System (INIS)

    Farooqui, S.Z.

    2001-01-01

    Wind energy is not only cheap and clean, it is also safe. It has been very low external and social costs, and it has no liabilities related to decommissioning of obsolete plants, such as nuclear power. Wind turbines do not pose any substantial threat to birds and other wildlife. Accidents with extremely rare, and there are no recorded cases of person hurt by parts of blades or ice loosened from a wind turbine. Wind turbines provide a good energy balance - the energy invested in the production, installation, operation and maintenance and decommissioning of a typical wind turbine has a 'pay-back' time of less than six months of operation, while its average productive life is about 20 years. Wind energy plants can be installed fast and the capacity can be increased as per demand, any time, without decommissioning the previous installations. Wind energy is a domestic source of energy, hence it can improve a nation's degree of self electrification of rapidly industrializing countries. However, it is realized that wind power alone cannot satisfy the world's increasing demand for electrical power. But wind energy represents a feasible supplement in a diversified energy supply portfolio. In order to develop a renewable energy culture in our society, the government must provide a variety of incentives, as have been provided in those countries where the renewable energies have grown to become important sources of power generation during the recent years. (AB)

  14. Follow the guide!

    CERN Multimedia

    2003-01-01

    For once it was the turn of the CERN guides to be shown around. A special tour had been organised for their annual outing on 24 June 2003, the aim of which was to go behind the scenes at research centres similar to CERN and discover the secrets of their public communications activities. The first stop was the European Synchrotron Radiation Facility (ESRF) in Grenoble, where the twenty or so CERN guides were welcomed by Dominique Cornujeols, head of communication at ESRF, who explained the Facility's history and purpose and how it operates before they were taken on a tour of the actual installations. CERN guides are welcomed to the ESRF (European Synchrotron Radiation Facility).The second visit of this trip to the Grenoble region was to the centre for science, technology and industry (CCSTI). "The people in charge at CCSTI showed us their day-to-day work in science and technology workshops", explains Stephan Petit, one of the guides. These workshops allow the public to discuss fundamental issues relating to a ...

  15. Wind Tunnel Analysis of the Airflow through Insect-Proof Screens and Comparison of Their Effect When Installed in a Mediterranean Greenhouse.

    Science.gov (United States)

    López, Alejandro; Molina-Aiz, Francisco D; Valera, Diego L; Peña, Araceli

    2016-05-12

    The present work studies the effect of three insect-proof screens with different geometrical and aerodynamic characteristics on the air velocity and temperature inside a Mediterranean multi-span greenhouse with three roof vents and without crops, divided into two independent sectors. First, the insect-proof screens were characterised geometrically by analysing digital images and testing in a low velocity wind tunnel. The wind tunnel tests gave screen discharge coefficient values of Cd,φ of 0.207 for screen 1 (10 × 20 threads·cm(-2); porosity φ = 35.0%), 0.151 for screen 2 (13 × 30 threads·cm(-2); φ = 26.3%) and 0.325 for screen 3 (10 × 20 threads·cm(-2); porosity φ = 36.0%), at an air velocity of 0.25 m·s(-1). Secondly, when screens were installed in the greenhouse, we observed a statistical proportionality between the discharge coefficient at the openings and the air velocity ui measured in the centre of the greenhouse, ui = 0.856 Cd + 0.062 (R² = 0.68 and p-value = 0.012). The inside-outside temperature difference ΔTio diminishes when the inside velocity increases following the statistically significant relationship ΔTio = (-135.85 + 57.88/ui)(0.5) (R² = 0.85 and p-value = 0.0011). Different thread diameters and tension affects the screen thickness, and means that similar porosities may well be associated with very different aerodynamic characteristics. Screens must be characterised by a theoretical function Cd,φ = [(2eμ/Kpρ)·(1/us) + (2eY/Kp(0.5))](-0.5) that relates the discharge coefficient of the screen Cd,φ with the air velocity us. This relationship depends on the three parameters that define the aerodynamic behaviour of porous medium: permeability Kp, inertial factor Y and screen thickness e (and on air temperature that determine its density ρ and viscosity μ). However, for a determined temperature of air, the pressure drop-velocity relationship can be characterised only with two parameters: ΔP = aus² + bus.

  16. Computational study: The influence of omni-directional guide vane on the flow pattern characteristic around Savonius wind turbine

    Science.gov (United States)

    Wicaksono, Yoga Arob; Tjahjana, D. D. D. P.

    2017-01-01

    Standart Savonius wind turbine have a low performance such as low coefficient of power and low coefficient of torque compared with another type of wind turbine. This phenomenon occurs because the wind stream can cause the negative pressure at the returning rotor. To solve this problem, standard Savonius combined with Omni Directional Guide Vane (ODGV) proposed. The aim of this research is to study the influence of ODGV on the flow pattern characteristic around of Savonius wind turbine. The numerical model is based on the Navier-Stokes equations with the standard k-ɛ turbulent model. This equation solved by a finite volume discretization method. This case was analyzed by commercial computational fluid dynamics solver such as SolidWorks Flow Simulations. Simulations were performed at the different wind directions; there are 0°, 30°,60° at 4 m/s wind speed. The numerical method validated with the past experimental data. The result indicated that the ODGV able to augment air flow to advancing rotor and decrease the negative pressure in the upstream of returning rotor compared to the bare Savonius wind turbine.

  17. US Army Weapon Systems Human-Computer Interface (WSHCI) style guide, Version 1

    Energy Technology Data Exchange (ETDEWEB)

    Avery, L.W.; O`Mara, P.A.; Shepard, A.P.

    1996-09-30

    A stated goal of the U.S. Army has been the standardization of the human computer interfaces (HCIS) of its system. Some of the tools being used to accomplish this standardization are HCI design guidelines and style guides. Currently, the Army is employing a number of style guides. While these style guides provide good guidance for the command, control, communications, computers, and intelligence (C4I) domain, they do not necessarily represent the more unique requirements of the Army`s real time and near-real time (RT/NRT) weapon systems. The Office of the Director of Information for Command, Control, Communications, and Computers (DISC4), in conjunction with the Weapon Systems Technical Architecture Working Group (WSTAWG), recognized this need as part of their activities to revise the Army Technical Architecture (ATA). To address this need, DISC4 tasked the Pacific Northwest National Laboratory (PNNL) to develop an Army weapon systems unique HCI style guide. This document, the U.S. Army Weapon Systems Human-Computer Interface (WSHCI) Style Guide, represents the first version of that style guide. The purpose of this document is to provide HCI design guidance for RT/NRT Army systems across the weapon systems domains of ground, aviation, missile, and soldier systems. Each domain should customize and extend this guidance by developing their domain-specific style guides, which will be used to guide the development of future systems within their domains.

  18. The effect of wind power installations on coastal tourism

    International Nuclear Information System (INIS)

    Blaydes Lilley, M.; Firestone, J.; Kempton, W.

    2010-01-01

    We surveyed more than 1,000 randomly sampled, out-of-state tourists at Delaware, USA beaches in 2007. After providing respondents with wind turbine project photo-simulations at several distances, we inquired about the effect development would have on visitation. Approximately one-quarter stated that they would switch beaches if an offshore wind project was located 10 km from the coast, with avoidance diminishing with greater distance from shore. Stated avoidance is less than: avoidance with a fossil fuel power plant located the same distance inland; attraction to a beach with offshore wind turbines; and the percentage stating they would likely pay to take a boat tour. (author)

  19. The Effect of Wind Power Installations on Coastal Tourism

    Directory of Open Access Journals (Sweden)

    Willett Kempton

    2010-01-01

    Full Text Available We surveyed more than 1,000 randomly sampled, out-of-state tourists at Delaware, USA beaches in 2007. After providing respondents with wind turbine project photo-simulations at several distances, we inquired about the effect development would have on visitation. Approximately one-quarter stated that they would switch beaches if an offshore wind project was located 10 km from the coast, with avoidance diminishing with greater distance from shore. Stated avoidance is less than: avoidance with a fossil fuel power plant located the same distance inland; attraction to a beach with offshore wind turbines; and the percentage stating they would likely pay to take a boat tour.

  20. The effect of wind power installations on coastal tourism

    Energy Technology Data Exchange (ETDEWEB)

    Blaydes Lilley, M.; Firestone, J.; Kempton, W. [Center for Carbon-free Power Integration, College of Earth, Ocean, and Environment, University of Delaware, Newark, DE 19716 (United States)

    2010-07-01

    We surveyed more than 1,000 randomly sampled, out-of-state tourists at Delaware, USA beaches in 2007. After providing respondents with wind turbine project photo-simulations at several distances, we inquired about the effect development would have on visitation. Approximately one-quarter stated that they would switch beaches if an offshore wind project was located 10 km from the coast, with avoidance diminishing with greater distance from shore. Stated avoidance is less than: avoidance with a fossil fuel power plant located the same distance inland; attraction to a beach with offshore wind turbines; and the percentage stating they would likely pay to take a boat tour. (author)

  1. The future of wind energy

    International Nuclear Information System (INIS)

    Koughnett, K. Van

    2003-01-01

    This presentation provided a brief history of wind power through the ages, and culminated with a look at installed capacity in 2002. Vision Quest has been in the wind power business since 1980, and the first turbines were installed in 1997. The company operates 40 per cent of Canada's wind capacity. Vision Quest became part of TransAlta in December 2002, the largest non-regulated electric generation and marketing company in Canada. The reasons for investing in wind power were briefly reviewed. The author then examined the physics of wind power and wind energy resources. The key resource issues were identified as being resource availability and constancy, which is similar to oil and gas exploration. Utility scale turbines were described. The pros and cons of larger turbines were compared, and it was shown that larger turbines offer better economics, a higher capacity factor and fewer turbines to permit. Manufacturers are focused on larger machines for offshore. The various permitting authorities and their areas of responsibility were listed, from municipal, provincial and federal levels. The key drivers are: wind speed, installed cost of equipment, revenue, operating expense, and financial expense. Project risks include: power purchase agreements, technology risk, financial risk, construction risk, regulation, operating risks, dependence on third parties, and reliance on advisors. Some of the challenges facing Vision Quest are being early, permitting, electric grid interconnection, openness of markets, market supply, demand forces, and getting capital costs down. tabs., figs

  2. Modeling energy production of solar thermal systems and wind turbines for installation at corn ethanol plants

    Science.gov (United States)

    Ehrke, Elizabeth

    Nearly every aspect of human existence relies on energy in some way. Most of this energy is currently derived from fossil fuel resources. Increasing energy demands coupled with environmental and national security concerns have facilitated the move towards renewable energy sources. Biofuels like corn ethanol are one of the ways the U.S. has significantly reduced petroleum consumption. However, the large energy requirement of corn ethanol limits the net benefit of the fuel. Using renewable energy sources to produce ethanol can greatly improve its economic and environmental benefits. The main purpose of this study was to model the useful energy received from a solar thermal array and a wind turbine at various locations to determine the feasibility of applying these technologies at ethanol plants around the country. The model calculates thermal energy received from a solar collector array and electricity generated by a wind turbine utilizing various input data to characterize the equipment. Project cost and energy rate inputs are used to evaluate the profitability of the solar array or wind turbine. The current state of the wind and solar markets were examined to give an accurate representation of the economics of each industry. Eighteen ethanol plant locations were evaluated for the viability of a solar thermal array and/or wind turbine. All ethanol plant locations have long payback periods for solar thermal arrays, but high natural gas prices significantly reduce this timeframe. Government incentives will be necessary for the economic feasibility of solar thermal arrays. Wind turbines can be very profitable for ethanol plants in the Midwest due to large wind resources. The profitability of wind power is sensitive to regional energy prices. However, government incentives for wind power do not significantly change the economic feasibility of a wind turbine. This model can be used by current or future ethanol facilities to investigate or begin the planning process for a

  3. Radar-cross-section reduction of wind turbines. part 1.

    Energy Technology Data Exchange (ETDEWEB)

    Brock, Billy C.; Loui, Hung; McDonald, Jacob J.; Paquette, Joshua A.; Calkins, David A.; Miller, William K.; Allen, Steven E.; Clem, Paul Gilbert; Patitz, Ward E.

    2012-03-05

    In recent years, increasing deployment of large wind-turbine farms has become an issue of growing concern for the radar community. The large radar cross section (RCS) presented by wind turbines interferes with radar operation, and the Doppler shift caused by blade rotation causes problems identifying and tracking moving targets. Each new wind-turbine farm installation must be carefully evaluated for potential disruption of radar operation for air defense, air traffic control, weather sensing, and other applications. Several approaches currently exist to minimize conflict between wind-turbine farms and radar installations, including procedural adjustments, radar upgrades, and proper choice of low-impact wind-farm sites, but each has problems with limited effectiveness or prohibitive cost. An alternative approach, heretofore not technically feasible, is to reduce the RCS of wind turbines to the extent that they can be installed near existing radar installations. This report summarizes efforts to reduce wind-turbine RCS, with a particular emphasis on the blades. The report begins with a survey of the wind-turbine RCS-reduction literature to establish a baseline for comparison. The following topics are then addressed: electromagnetic model development and validation, novel material development, integration into wind-turbine fabrication processes, integrated-absorber design, and wind-turbine RCS modeling. Related topics of interest, including alternative mitigation techniques (procedural, at-the-radar, etc.), an introduction to RCS and electromagnetic scattering, and RCS-reduction modeling techniques, can be found in a previous report.

  4. Post-clip placement MRI following second-look US-guided core biopsy for suspicious lesions identified on breast MRI.

    Science.gov (United States)

    Song, Sung Eun; Cho, Nariya; Han, Wonshik

    2017-12-01

    To evaluate whether the post-clip placement MRI following second-look ultrasound (US)-guided core biopsy is useful to confirm the adequate sampling of suspicious lesions identified on breast MRI. Between 2014 and 2016, 31 consecutive women with 34 suspicious lesions that had not been identified on previous mammography or US were detected using MRI. Among them, 26 women with 29 lesions (mean size 1.5 cm, range 0.5-5.8 cm) found by second-look US underwent US-guided biopsy, subsequent clip insertion and post-clip placement MRI. Five women with five lesions that were not found by second-look US underwent MRI-guided biopsy. The technical success rate and lesion characteristics were described. The technical success rate was 96.6% (28/29). One failure case was a benign, 1.1-cm non-mass enhancement. Of the 28 success cases, 23 (82.1%) were masses and 5 (17.9%) were non-mass enhancements; 17 (60.7%) were benign, 4 (14.3%) were high-risk and 7 (25.0%) were malignant lesions. The technical success rate was 100% (28/28) for masses and 83.3% (5/6) for non-mass enhancements. Post-clip placement MRI following US-guided biopsy is useful in confirming the adequate sampling of lesions identified on MRI. This method could be an alternative to MRI-guided biopsy for lesions visible on US. • Post-clip MRI is useful for confirming adequate sampling of US-guided biopsy. • Post-clip MRI following US-guided biopsy revealed a 96.6 % technical success rate. • One technical failure case was a benign, 1.1-cm non-mass enhancement. • The technical success rate of US-guided biopsy for non-mass enhancements was 83.3 %.

  5. Decree of the 6 May 2017 defining the conditions of additional remuneration of electricity produced by electricity production installations using wind mechanical energy with a maximum of 6 wind turbines. Decree of the 9 May 2014 defining purchase and additional remuneration conditions for the electricity produced by installations using mainly biogas produced by methanization of matters resulting from urban or industrial waste water treatment. Decree of the 9 May 2017 defining purchase conditions for electricity produced by installations implanted on building and using photovoltaic solar energy, with an installed power less than or equal to 100 kilowatts as those concerned at the 3. of the article D.314-15 of the Code of Energy, and located in continental metropolitan territory

    International Nuclear Information System (INIS)

    Royal, Segolene; Sapin, Michel

    2017-01-01

    This document gathers three legal texts which respectively define and eventually give elements and methods of calculation of conditions of additional remuneration or purchase of electricity produced by limited wind energy installations, by biogas-based electricity production installations, and by photovoltaic installations mounted on buildings

  6. 75 FR 54921 - Withdrawal of Regulatory Guides 1.38, 1.94, and 1.116

    Science.gov (United States)

    2010-09-09

    ... Guide 1.38, ``Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling....116, ``Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical... Development Branch, Division of Engineering, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory...

  7. Evaluation guide for the radiological impact study of a basic nuclear installation (BNI) as a support for the authorization application of releases

    International Nuclear Information System (INIS)

    Chartier, Mr.; Despres, A.; Supervil, S.; Conte, D.; Hubert, P.; Oudiz, A.; Champion, D.

    2002-10-01

    At the time of a licence application of effluent releases and water pumping of basic nuclear facilities (BNF), the operator of the installation must in particular provide a radiological impact study of the radioactive effluent releases coming from the installation on the environment and on public health. An impact study of the radioactive releases represents technical and conditional specifications. It was for this reason that the French Safety Authority (ASN then DSIN) and the Directorate-General of Health Services (DGS) requested IRSN (then IPSN), in April 1999, to develop a guide facilitating the review of such a study, as well for the services implied in the examination of the licence applications, as for all the concerned parties in this field. The objective of the guide is to take into account the regulatory context which underlies the development of the impact studies (decree no. 95-540 of May 4, 1995, modified by the decree no. 2002-460 of April 4, 2002, and the Euratom guideline 96/29 of May 13, 1996, known as 'the basic standard guideline', accompanied by its transposition texts in French law). In this precise context, the guide proposes to assess the radiological impact study of a BNF from three different angles: - the description and the quantification of the produced effluents, by taking account of the triggering processes, of the different processing measures and of the procedures to optimise the reduction of the produced effluents; - the estimate of the dosimetric impact of the planned releases on the population, taking into account the environmental characteristics of the installation; - the definition of the conditions to monitor the releases and the environment. This guide provides a general condition logical framework adaptable to any particular situation met

  8. Wind energy for a sustainable development

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Hasager, Charlotte Bay; Sempreviva, Anna Maria

    2014-01-01

    of both the wind energy related research activities and the wind energy industry, as installed capacity has been increasing in most of the developed and developing countries. The DTU Wind Energy department carries the heritage of the Risø National Laboratory for Sustainable Energy by leading the research......Wind energy is on the forefront of sustainable technologies related to the production of electricity from green sources that combine the efficiency of meeting the demand for growth and the ethical responsibility for environmental protection. The last decades have seen an unprecedented growth...... developments in all sectors related to planning, installing and operating modern wind farms at land and offshore. With as many as 8 sections the department combines specialists at different thematic categories, ranging from meteorology, aeroelastic design and composite materials to electrical grids and test...

  9. Energy Optimization Assessment at U.S. Army Installations: West Point Military Academy, NY

    Science.gov (United States)

    2008-09-01

    chillers to work unnecessarily more than needed. Other buildings had setpoints at different areas above 55 °F. Many buildings are air-conditioned and... optimal . The cost of 12.5 cents/KWh makes it unlikely, especially where steam adsorption chillers exist. 11.8.2 Solution Use the existing steam...ER D C/ CE R L TR -0 8 -1 4 Energy Optimization Assessment at U.S. Army Installations West Point Military Academy, NY David M

  10. Understanding wind power technology theory, deployment and optimisation

    CERN Document Server

    Schaffarczyk, Alois

    2014-01-01

    Wind energy technology has progressed enormously over the last decade. In coming years it will continue to develop in terms of power ratings, performance and installed capacity of large wind turbines worldwide, with exciting developments in offshore installations. Designed to meet the training needs of wind engineers, this introductory text puts wind energy in context, from the natural resource to the assessment of cost effectiveness and bridges the gap between theory and practice. The thorough coverage spans the scientific basics, practical implementations and the modern state of technology

  11. Feasibility Study of Economics and Performance of Wind Turbine Generators at the Newport Indiana Chemical Depot Site

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, Joseph Owen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, Gail [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Newport Indiana Chemical Depot site in Newport, Indiana, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the sitefor possible wind turbine electrical generator installation and estimate the cost, performance, and site impacts of different wind energy options. In addition, the report recommends financing options that could assist in the implementation of a wind system at the site.

  12. Performance of wind energy in 2015 and future perspectives - Press file

    International Nuclear Information System (INIS)

    Allenet, Tiffany; Resse, Bastien; Kari, Cynthia

    2016-01-01

    This document first proposes a press release which outlines the steady growth of the wind energy installed power in France, the conditions to be met for a continuous progression of wind energy, the necessary development of offshore wind energy production, and the necessity of an agreement with military authorities who still limit wind farm projects because of constraints related to air force training and to military radars. Data are then presented regarding the installed and connected power (manufacturer shares), technical characteristics of the main installed models, installed capacity per region. Brief articles comment the implications of the COP21 for the wind energy sector and French territories, the project of multi-annual planning of energy for 2016-2023, the military constraints and propositions to reduce them, and the rather high growth of employment in the sector

  13. Solar Energy Installers Curriculum Guides. Book I.

    Science.gov (United States)

    Walker, Gene C.

    This first volume of a comprehensive curriculum guide for the heating-ventilation-air conditioning-refrigeration-solar student is designed to assist high school area vocational centers or community college instructors in the implementation and operation of comfort training programs. Following an introductory section, the guide provides job…

  14. Techno-economic analysis of a wind-solar hybrid renewable energy system with rainwater collection feature for urban high-rise application

    International Nuclear Information System (INIS)

    Chong, W.T.; Naghavi, M.S.; Poh, S.C.; Mahlia, T.M.I.; Pan, K.C.

    2011-01-01

    Graphical abstract: This wind-solar hybrid renewable energy system is a new concept of the utilization, integration and optimization of existing renewable energy and rain water harvesting technologies. It is compact and can be built on the top of high rise buildings to provide on-site green power to that building or feed into the grid line. This system utilizes the advantages of Malaysian climate, i.e. high solar radiation and rainfall for green energy generation and free water supply. It also overcomes the inferior aspect on the low wind speed by guiding and increasing the speed of the high altitude free-stream wind from all directions radially through power-augmentation-guide-vane (PAGV) before entering the wind turbine at center portion. The PAGV is an innovative design used to guide and create venturi effect to increase the wind speed before the wind-stream enters wind turbine. The system must also be designed to provide optimum surface area for solar panel (solar thermal or photovoltaic or solar PV/T)) installation and battery compartment for power storage. In addition; rain water collection feature must be built-into the system design. The system is recommended to be sited on the top of high rise buildings or structures with its appearance or outer design can be blended into the building architecture without negative visual impact. With this system, the size of wind turbine can be reduced for a given power output and the noise is also reduced since it is contained in the PAGV. The design is also safer and suitable to be used in populated area. Mesh can be mounted at the entrance of the PAGV to prevent the bird-strike. This system can eliminate or minimize the current problems concerning public acceptance of wind energy, i.e. poor starting behavior in low wind speed, noise, visual impact, electromagnetic interference, safety and environmental factors. Highlights: → This wind, solar and rain harvester integrates existing renewable energy and rain water

  15. Visualization of wind farms

    International Nuclear Information System (INIS)

    Pahlke, T.

    1994-01-01

    With the increasing number of wind energy installations the visual impact of single wind turbines or wind parks is a growing problem for landscape preservation, leading to resistance of local authorities and nearby residents against wind energy projects. To increase acceptance and to form a basis for planning considerations, it is necessary to develop instruments for the visualization of planned wind parks, showing their integration in the landscape. Photorealistic montages and computer animation including video sequences may be helpful in 'getting the picture'. (orig.)

  16. Guide to commercially available wind machines

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-03

    Wind Energy Conversion Systems (WECS) commercially available in the United States are described. The terms used to describe these wind systems are defined and their significance discussed. Lists of manufacturers and distributors, subsystem components and suppliers, and references are provided.

  17. Offshore Wind Farms

    DEFF Research Database (Denmark)

    Lundtang Petersen, Erik; Hasager, Charlotte Bay; Courtney, Michael

    2015-01-01

    : the rotor, the nacelle, the tower, and the foundation. Further the determinations of the essential environmental conditions are treated: the wind field, the wave field, the sea current, and the soil conditions. The various options for grid connections, advantages, and disadvantages are discussed. Of special...... concern are the problems associated with locating the turbines close together in a wind farm and the problems of placing several large wind farms in a confined area. The environmental impacts of offshore wind farms are also treated, but not the supply chain, that is, the harbors, the installation vessels...

  18. The complete atlas of wind farms and projects in France

    International Nuclear Information System (INIS)

    Le Jannic, N.; Guillier, A.

    2012-01-01

    932 wind farms are in operation or in project at the end of the first semester of 2012 in France. Wind energy continues increasing, the total installed power reaches 7182 MW and about 738 MW have been installed during the last 12 months. This document lists all these wind farms and gives some information like the locality, the name of the operator, the power installed, the number of turbines, the name of the turbine manufacturer and the past or future date of commissioning. (A.C.)

  19. NORCOWE Reference Wind Farm

    DEFF Research Database (Denmark)

    Bak, Thomas; Graham, Angus

    2015-01-01

    Offshore wind farms are complex systems, influenced by both the environment (e.g. wind, waves, current and seabed) and the design characteristics of the equipment available for installation (e.g. turbine type, foundations, cabling and distance to shore). These aspects govern the capital and opera...

  20. Urban wind turbines. Guidelines for small wind turbines in the built environment

    International Nuclear Information System (INIS)

    Cace, J.; Ter Horst, E.; Syngellakis, K.; Niel, M.; Clement, P.; Heppener, R.; Peirano, E.

    2007-02-01

    The objective of the WINEUR project (Wind Energy Integration in the Urban Environment) is to determine the deployability of small wind turbines in built environments while identifying the current significant constraints and possible solutions. The purpose of this document is to Inform the stakeholders about the state of the development of small wind turbines for the built environment; Provide practical guidelines to actors dealing with installation of small wind turbines in urban areas; and Provide recommendations for future products and for market development

  1. Advanced Offshore Wind Energy - Atlantic Consortium

    Energy Technology Data Exchange (ETDEWEB)

    Kempton, Willett

    2015-11-04

    This project developed relationships among the lead institution, U of Delaware, wind industry participants from 11 companies, and two other universities in the region. The participating regional universities were University of Maryland and Old Dominion University. Research was carried out in six major areas: Analysis and documentation of extreme oceanic wind events & their impact on design parameters, calibration of corrosivity estimates measured on a coastal turbine, measurment and modeling of tower structures, measurement and modeling of the tribology of major drive components, and gearbox conditioning monitoring using acoustic sensors. The project also had several educational goals, including establishing a course in wind energy and training graduate students. Going beyond these goals, three new courses were developed, a graduate certificate program in wind power was developed and approved, and an exchange program in wind energy was established with Danish Technical University. Related to the installation of a Gamesa G90 turbine on campus and a Gamesa-UD research program established in part due to this award, several additional research projects have been carried out based on mutual industry-university interests, and funded by turbine revenues. This award and the Gamesa partnership have jointly led to seven graduate students receiving full safety and climb training, to become “research climbers” as part of their wind power training, and contributing to on-turbine research. As a result of the educational program, already six graduate students have taken jobs in the US wind industry.

  2. Danish wind power in Brazil. Part 2. Experience with Danish 75 kW wind turbine - the first modern turbine in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Husted Rich, N; Kildemoes Moeller, T

    1996-04-01

    In June of 1992, the first grid-connected wind turbine (75 kW, 12 m/s) in Brazil was installed in the complex terrain of the island of Fernando de Noronha in the northeastern part of the country. The objective was to install a Danish wind turbine in order to encourage the use of wind energy in Brazil and to demonstrate Danish wind technology with the view of opening up the Brazilian market for Danish windmills. It is claimed that the turbine, backed up by the media, attracted a certain amount of attention despite problems caused by the weakness of the electric grid on the island. The market in Brazil is still not ready for wind turbines and responsibility for any future wind energy policy is held by the political decision makers, so it is recommended that further demonstration projects be set up. The document presents a general view of the wind conditions and a view of the local electric power system with the aim of improving the potential for further installation of Danish wind turbines on the island. It proved difficult to obtain information on the performance of the windmill due to frequent rotations in the hierarchy of the state utility company CELPE, and the highly bureaucratic structure in general. It is stated that CELPE intends to install two more wind turbines on the island and that this could be a proof of recognition that technical problems that arose were caused by the unsatisfactory grid structure on the island and not related to faults in the wind turbine itself, and also a proof of their confidence in the idea of wind energy as a reliable source of electricity production. (AB)

  3. 2017 State of Wind Development in the United States by Region

    Energy Technology Data Exchange (ETDEWEB)

    Oteri, Frank A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baranowski, Ruth E [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tegen, Suzanne I [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-04-13

    This document summarizes the status and drivers for U.S. wind energy development during 2017. Regional Resource Center (RRC) leaders provided a report of wind energy development in their regions, which was combined with findings from National Renewable Energy Laboratory (NREL) researchers to provide an account of the state of the regions, as well as updates on developments in individual states. NREL researchers and state partners added updates for all states that are not directly supported by an RRC. Accounts for each region include updates on renewable portfolio standards, workforce development, manufacturing and economic development, and individual state updates for installed wind capacity, ongoing policy developments, planned projects and their status, transmission progress reports, etc. This report also highlights the efforts of the RRCs to engage stakeholders in their individual regions.

  4. Report on wind energy for small communities

    Energy Technology Data Exchange (ETDEWEB)

    Maissan, J.F. [Leading Edge Projects Inc., Whitehorse, YT (Canada)

    2006-04-15

    Wind energy projects can be economically viable in the north under a range of conditions when oil prices are in the range of $60 U.S. per barrel. Some of the requirements for economic viability include locations with economies of scale, availability of local equipment, availability of local technical human resources, access to reasonable transportation, and a committed community and project proponent. This paper presented the results of a study on wind energy in small northern communities. The objective of the paper was to provide an assessment of the feasibility of wind power to community leaders in diesel-dependant remote communities. The paper provided a review of wind power technologies including wind turbines; wind turbine towers; wind-diesel integration; wind penetration levels; anti-icing technology; suppliers of wind-diesel integration systems; and wind turbine manufacturers promoting wind-diesel systems. The paper also provided a review of the historical capital costs for the installation of wind projects; recommendations from project developers; project site selection criteria; as well as a simplified economic analyses for small communities. The paper also discussed the successful Kotzebue Alaska wind-diesel project as a model to follow. It described how to start a wind energy program with reference to the roles of the federal government, territorial governments and their power utilities. It was demonstrated that wind energy can be a cost effective option to reduce diesel generation requirements in the appropriate circumstances. It was concluded that deployment of wind energy in the north still needs to proceed on a carefully planned path beginning with leader projects and branching out from there. In addition, there is a need for good quality wind resource assessment at potential wind project locations in many communities in the north. refs., tabs., figs.

  5. EurObserv'ER's 2010 wind power barometer

    International Nuclear Information System (INIS)

    Anon.

    2011-01-01

    For the first time in 20 years, the growth of the global wind power market faltered, stumbling by 5.8% to 35.7 GW in 2010. On one hand, the North American market has taken a knock while the European market has slowed down, on the other hand, Asian market growth has crept up steadily and now has a grip on more than half the global market. At the end of 2010 we had 194.5 GW of wind power installed across the world among which 84.3 GW installed in the European Union. Germany and Spain lead the European Union list for installed wind power with respectively 27.21 GW and 20.68 GW but when this capacity is divided by the population, Denmark ranks first with 686, 6 kW/1000 inhabitants followed by Spain with 449.6 KW/1000 inhabitants. 2010 was a record year for offshore wind power. The offshore share of the total wind power market rose to 12.2% in 2010. First available estimates indicate that the European Union's wind energy electricity output for 2010 should reach 147 TWh, which is an 11.2% rise on 2009. In 2010, the global leading manufacturer is probably Chinese. Back to 2009, the top 4 wind turbines suppliers were Vestas (Denmark), GE Wind (Usa), Sinovel (China) and Enercon (Germany). (A.C.)

  6. US-guided percutaneous ethanol injection in Plummer's adenoma

    International Nuclear Information System (INIS)

    Lagalla, R.; Iovane, A.; Caruso, G.; Midiri, N.; Oliveri, D.; Brancato, G.; Cardinale, A.

    1991-01-01

    The authors report their experience in the study of 8 patients showing sympoms of thyroid hyperfunction (Plummer's adenoma) and treated with US-guided percutaneous ethanol injection. The treatment consisted in injecting sterile ethanol in varying amounts (2 to 5 ml) according to nodule size, using a fine needle under US guidance. The patients underwent 3 to 6 injections, according to biochemical (T3-T4-TSH) and scintigraphic findings. Follow-up ay 12 months showed regression of clinical symptoms, a trend of hormone levels toward normalization and recovery of previously suppressed parenchymal function. No significant complications were observed, except for a transient thyrotoxic crisis in the patient bearing the largest nodule. The treatment of Plummer's adenoma by means of percutaneous ethanol injection under us guidance appears to provide specific clinical and technical advantages over other conventional treatments

  7. International wind energy development. World marked update 1999. Forecast 2000-2004

    International Nuclear Information System (INIS)

    2000-03-01

    This is the fifth issue of the annual World Market Update by BTM Consult ApS, covering the year 1999. All figures in the status refer to the end of year 1999. It is the last update from the 20th century, in which wind energy developed during the last two decades to become a very serious part of the world electricity supply. As in previous reports, the past 3 years' development in the wind energy sector is assessed, and the forecast looks 5 years ahead. Wind power is the world's fastest growing energy source, with an average annual growth rate of 40 % over the last five years. Wind energy is a clean and abundant energy source, and it is becomming a preferred source of energy not only due to the environmental benefits, but also because it has become increasingly cost competitive in the world energy markets. One of the most significant figures and trends from this fast growing market during 1999 was that the annual installation of new wind power capacity increased by 51 %, resulting in a cumulative installation by the end of 1999 of 13,932 MW. The growth rates in the wind industry can easily be compared to the growth rates in the IT sector, although the growth differ much from country to country. The high growth rates are still very much influenced by political and economical issues, but the continuously improved technology and thus also the redused cost of energy becomes more and more significant, and there are hardly any arguments left why wind energy should not play a very significant role in the electricity supply. Approximately 81 % of the new capacity of 3,922 were installed in Europe, emphasizing that this region is still the major market place. The US market picked up close to the PTC expiry date (Production Tax Credit) on June 30, 1999. In terms of single markets it was, however, the German market which once again took the lead with installed capacity of 1,568 MW. Germany thereby consolidated the position as the leading wind energy country in the world. Spain

  8. About wind energy in Senegal

    International Nuclear Information System (INIS)

    Sall, M.

    1991-01-01

    In Senegal 80% of the energy consumption is still in the form of wood. Therefore, a large reforestation programme is initiated for which water is necessary. Besides using water of wind pumps for tree plantations and vegetable growing projects, the windmills are used for domestic uses and drinking water for animals. Women are the best users of wind pumps. The main problem regarding the use of wind pumps is maintenance. During several years one organization was in charge of maintenance. But as distances (also between wind pumps) are very large and it formerly was a governmental organization, it did not have the power to survive. Also, many farmers did not have the money to pay this organization properly for the maintenance. The most important aspect however, is that donors only support the windpump: its installation and maintenance are excluded. In some cases it appeared that installation of wind pumps was only executed for political reasons, which resulted in no maintenance and therefore in a bad promotion of wind energy. 4 refs

  9. Small Wind Site Assessment Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Tim [Advanced Energy Systems LLC, Eugene, OR (United States); Preus, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    Site assessment for small wind energy systems is one of the key factors in the successful installation, operation, and performance of a small wind turbine. A proper site assessment is a difficult process that includes wind resource assessment and the evaluation of site characteristics. These guidelines address many of the relevant parts of a site assessment with an emphasis on wind resource assessment, using methods other than on-site data collection and creating a small wind site assessment report.

  10. World Wind 3D Earth Viewing

    Science.gov (United States)

    Hogan, Patrick; Maxwell, Christopher; Kim, Randolph; Gaskins, Tom

    2007-01-01

    World Wind allows users to zoom from satellite altitude down to any place on Earth, leveraging high-resolution LandSat imagery and SRTM (Shuttle Radar Topography Mission) elevation data to experience Earth in visually rich 3D. In addition to Earth, World Wind can also visualize other planets, and there are already comprehensive data sets for Mars and the Earth's moon, which are as easily accessible as those of Earth. There have been more than 20 million downloads to date, and the software is being used heavily by the Department of Defense due to the code s ability to be extended and the evolution of the code courtesy of NASA and the user community. Primary features include the dynamic access to public domain imagery and its ease of use. All one needs to control World Wind is a two-button mouse. Additional guides and features can be accessed through a simplified menu. A JAVA version will be available soon. Navigation is automated with single clicks of a mouse, or by typing in any location to automatically zoom in to see it. The World Wind install package contains the necessary requirements such as the .NET runtime and managed DirectX library. World Wind can display combinations of data from a variety of sources, including Blue Marble, LandSat 7, SRTM, NASA Scientific Visualization Studio, GLOBE, and much more. A thorough list of features, the user manual, a key chart, and screen shots are available at http://worldwind.arc.nasa.gov.

  11. Commercialisation of wind farms in Europe by the year 2000

    International Nuclear Information System (INIS)

    Musgrove, P.; Lindley, D.

    1990-01-01

    By the end of 1989 approximately 325 MW of wind turbine capacity had been installed in Europe, corresponding to the grid connection of over 3000 wind turbines. Although this is only about one quarter of the capacity installed in California it is now becoming clear that Europe will see major market growth through the early I990s. The progress that has been made towards the commercialisation of wind energy in the European Community up to 1990 is reviewed, and it is shown that wind energy has the potential to make a substantial contribution towards European electricity needs, and in so doing can: reduce European dependence on imported fuels, help meet European goals for reduced carbon dioxide emissions, and reduce acid rain emissions. Electricity from wind farms on good European sites is already cheaper than nuclear power, and is close to competitive with electricity from coal. In fact if compensation is given for the environmental damage avoided (through the absence of polluting emissions) then wind energy is already competitive with coal in large areas of Europe. Europe could and should target to achieve 10 % of its electricity needs from the wind by the second quarter of the next century. This will require the installation of 100 000 MW of wind turbines. Over the next, crucial, decade it is realistic to set a target of 5000 MW installed by the year 2000, with an installation rate by then of over 1000 MW/year. However political action is required if these goals are to be met, to ensure that wind generated electricity gets paid an equitable price that includes allowance for the avoided external costs

  12. Mid-Atlantic Wind - Overcoming the Challenges

    Energy Technology Data Exchange (ETDEWEB)

    Daniel F. Ancona III; Kathryn E. George; Richard P. Bowers; Dr. Lynn Sparling; Bruce Buckheit; Daniel LoBue

    2012-05-31

    This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3) at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.

  13. Mid-Atlantic Wind - Overcoming the Challenges

    Energy Technology Data Exchange (ETDEWEB)

    Daniel F. Ancona III; Kathryn E. George; Lynn Sparling; Bruce C. Buckheit; Daniel LoBue; and Richard P. Bowers

    2012-06-29

    This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3) at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.

  14. 'Wind in motion'. The rough guide to wind energy development

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-15

    This project, which will run from January 2005 to October 2005, aims to develop a promotional DVD to inform and reassure the public and specific audiences on controversial aspects of proposed new wind farms. The DVD would also be used as a tool to gain acceptance and contributions from bodies involved in wind energy developments. 'Wind in Motion' complements a number of other public relations campaigns being undertaken bor proposed by the Department of Trade and Industry (DTI) and the British Wind Energy Association (BWEA). The DVD would cover issues such as the impact of wind farms of wild birds, the visual impact of wind farms on the landscape, the impact on tourism in scenic areas, the impact of local house prices, the impact on local residents during the construction and operational phases, and comparisons with the capacity and efficiencies of other electricity generating systems such as coal, gas and nuclear. The project's objectives are to facilitate the deployment of wind energy by addressing information barriers and providing information to help industry with transferable skills to diversify in the supply chain. Work will include cataloguing the footage taken for the DVD to allow it to be made available to the industry and producing case studies of the benefits of skills transfer.

  15. The world powers trumpet their achievement as wind power development continues unbridled

    International Nuclear Information System (INIS)

    2016-01-01

    In 2014 the top 3 countries by installed wind power capacity were China, the USA and Germany, ranked first to third in that order with cumulative installed capacities of 114,763 MW, 65,879 MW and 40,468 MW respectively. The three wind power employers’ associations of each country have already published preliminary data on installed capacity in 2015, revealing that China has maintained its leadership in terms of both added and cumulative capacity with an additional 30.5 GW over the year. The USA closed 2015 with almost 8.6 GW installed over the course of the year. Germany, with separate figures published for onshore and offshore wind power, has closed with a total of 5.8 GW of newly installed wind power of which 3.5 GW corresponds to onshore and 2.3 GW to offshore. (Author)

  16. Assessment of wind resources and annual energy production of wind farms

    DEFF Research Database (Denmark)

    the last 17 years. In Denmark the plan is to increase to 50% share of total electricity consumption in 2020 compared to 26% in 2011. In EU this was 6.3% in 2011. In EU new installed wind power was 9 GW and 0.8 GW, onshore and offshore, respectively, in 2011. The total capacity in Europe is 96 GW......Wind energy provides a significant share of EU’s renewable energy source. It is anticipated in the European Commission (EC), the International Energy Agency (IEA), and the European Wind Energy Association (EWEA) that wind energy expands further. Wind energy has had an annual growth of 15.6% during...

  17. Offshore wind development research (technical brief).

    Science.gov (United States)

    2014-04-01

    The study addresses all aspects of Offshore Wind (OSW) development. This includes identifying : vessel types, vessel installation methods, needs and operating characteristics through all phases : of OSW installation, construction, operations and main...

  18. World trends in wind energy. A focus per country. Analysis

    International Nuclear Information System (INIS)

    Kane, Mamadou

    2016-01-01

    A set of articles highlights and comments various trends related to the development of wind energy in 2015. More specifically, the articles outline that 2015 has been a record year for wind energy in the World (an increase of 63.900 MW in installed power), that wind energy covers 11.4 per cent of energy demand in Europe, that the wind energy sector is still in a very good health in the USA (more megawatts have been installed during the last quarter of 2015 than during the whole 2014 year and perspectives seem promising in terms of installed power, share of energy, costs and prices), that Denmark holds the world record of wind energy consumption in 2015 (42.1 per cent of its energy consumption in 2015), that Mauritania could be the engine of the wind energy sector in western Africa (a first important wind farm has been installed in 2012, followed by others with a higher production, and a 100 MW project), that Scotland awarded a 53 MW project to Siemens (using the Siemens G2 platform), and that Kenya signed a partnership with a Chinese company for a 102 MW project. The last article outlines that renewable energies appear to be resilient in front of the oil crisis

  19. Social attitude towards wind energy applications in Greece

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2005-01-01

    During the last 3 yr (1999-2002) a significant increase in the utilization of the existing wind power has taken place in Greece, after a long period (1993-1998) of inactivity. Unfortunately, the largest part of new scheduled installations is concentrated in a few geographical regions, in an attempt to take advantage of the existing electrical network capabilities and the acceptable infrastructure situation. This significant concentration of very large size wind turbines, rapidly installed in a few geographical areas, led to serious reactions from the local population, which in some cases even led to the complete cancellation of the wind power projects. In this context, an extensive study is conducted, concerning the public attitude towards wind energy applications, in several island and mainland Greek territories possessing high wind potential and investment interest. The results obtained significantly reveal acceptance of the existing wind parks, being, however, rather against new installations. More specifically, in the Greek islands the public attitude is clearly supportive, while in the Greek mainland the public attitude is either divided or definitely against wind power applications. The most troublesome outcome of this survey is the existence of a specific minority that is strongly against wind energy applications, disregarding any financial benefits. Among the primary conclusions drawn, one may underline the necessity of additional public information regarding the wind energy sector

  20. Wind's tough dreamers

    Energy Technology Data Exchange (ETDEWEB)

    Gipe, P.

    1984-02-01

    The development of wind farms in California is reviewed. These wind farms are located at Carquinez Strait, Altamont Pass, Salinas Valley, Tehachapi Pass, Mojave, and San Gorgonio Pass. The machine size, installation, spacing, reliability, performance management, and financing are discussed.

  1. Co-generation of hydrogen from nuclear and wind: the effect on costs of realistic variations in wind capacity and power prices

    International Nuclear Information System (INIS)

    Miller, A.I.; Duffey, R.

    2005-01-01

    Can electricity from high-capacity nuclear reactors be blended with the variable output of wind turbines to produce electrolytic hydrogen competitively? Future energy hopes and emissions reduction scenarios place significant reliance on renewables, actually meaning largely new wind power both onshore and offshore. The opportunity exists for a synergy between high capacity factor nuclear plants and wind power using hydrogen by both as a 'currency' for use in transportation and industrial processing. But this use of hydrogen needs to be introduced soon. To be competitive with alternative sources, hydrogen produced by conventional electrolysis requires low-cost electricity (likely <2.5 Cent US/kW.h). One approach is to operate interruptibly allowing an installation to sell electricity when the grid price is high and to make hydrogen when it is low. Our previous studies have shown that this could be a cost-competitive approach with a nuclear power generator producing electricity around 3 Cent US/kW.h. Although similar unit costs are projected for wind-generated electricity, idleness of the hydrogen production (electrolysis) facility due to the variability of wind generated electricity imposes a serious cost penalty. This paper reports our latest results on the potential economics of blending electricity from nuclear and wind sources by using wind-generated power, when available, to augment the current through electrolysis equipment that is primarily nuclear-powered. A voltage penalty accompanies the higher current. A 10% increase in capital cost for electrolysis equipment enables it to accommodate the higher rate of hydrogen generation, while still being substantially cheaper than the capital cost of wind-dedicated electrolysis. Real-time data for electricity costs have been combined with real-time wind variability in our NuWind model. The variability in wind fields between sites was accommodated by assuming an average wind speed that produced an average electricity

  2. A novel off-grid hybrid power system comprised of solar photovoltaic, wind, and hydro energy sources

    International Nuclear Information System (INIS)

    Bhandari, Binayak; Lee, Kyung-Tae; Lee, Caroline Sunyong; Song, Chul-Ki; Maskey, Ramesh K.; Ahn, Sung-Hoon

    2014-01-01

    Highlights: • We propose two hybridization methods for small off-grid power systems consisting solar (PV), wind, and micro-hydro sources. • One of the methods was implemented in a mini-grid connecting Thingan and Kolkhop villages in Makawanpur District, Nepal. • The results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. • This is the first implementation anywhere comprising of three renewable energy power, in a single off-grid power system. • This research may be applied as a practical guide for implementing similar systems in various locations. - Abstract: Several factors must be considered before adopting a full-phase power generation system based on renewable energy sources. Long-term necessary data (for one year if possible) should be collected before making any decisions concerning implementation of such a systems. To accurately assess the potential of available resources, we measured solar irradiation, wind speed, and ambient temperature at two high-altitude locations in Nepal: the Lama Hotel in Rasuwa District and Thingan in Makawanpur District. Here, we propose two practical, economical hybridization methods for small off-grid systems consisting entirely of renewable energy sources—specifically solar photovoltaic (PV), wind, and micro-hydro sources. One of the methods was tested experimentally, and the results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. Hydro, wind, and solar photovoltaic energy are the top renewable energy sources in terms of globally installed capacity. However, no reports have been published about off-grid hybrid systems comprised of all three sources, making this implementation the first of its kind anywhere. This research may be applied as a practical guide for implementing similar systems in various locations. Of the four off-grid PV systems installed by the authors for village electrification in Nepal, one was

  3. Deepwater offshore windfarm. Design fabrication and installation study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report discusses the plans and benefits of using the Beatrice oil field installation for the development of the offshore Beatrice windfarm in the Moray Firth. The development of an economic support structure for wind turbine generators to allow development of deepwater wind farms was investigated, and the screening of structural designs, and the analysis of fatigue, fabrication and installation considerations is described. Details are given of the recommendation for a further examination of two structural designs as options for the Beatrice windfarm development, the estimated costs, and the results of an environmental review.

  4. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  5. Nuclear installations safety in France. Compilation of regulatory guides

    International Nuclear Information System (INIS)

    1988-01-01

    General plan: 1. General organization of public officials. Procedures 1.1. Texts defining the general organization and the procedures 1.2. Interventing organisms; 2. Texts presenting a technical aspect other than basic safety rules and associated organization texts; 2.1. Dispositions relating to safety of nuclear installations 2.2. Dispositions relating to pressure vessels 2.3. Dispositions relating to quality 2.4. Dispositions relating to radioactive wastes release 2.5. Dispositions relating to activities depending of classified installations; 3. Basic Safety Rules (BSR) 3.1. BSR relating to PWR 3.2. BSR relating to nuclear installations other than PWR 3.3. Other BSR [fr

  6. Wind rotor power station BONI-ShHV

    International Nuclear Information System (INIS)

    Bolotov, A.V.

    1999-01-01

    Wind rotor power station (WRPS) BONI-ShHV has following advantages : the increase of installation stability by rise of wind velocity and rotation speed of rotor due to gyroscopic effect; the absence noise and vibration; the safety for birds and animals; ability of compact installation and creation of series of wind power dams with higher capacity; the simplicity and fast assembling and putting into operation. The price of 1 k W of installing capacity is lower about 2.5-3 times compare to usual WRPS due to simple kinematic scheme. WRPS has high specific output of electrical energy due to use of low and long existing wind velocity and due to short storms, giving greater power. It has ability to be replayed when average annual wind velocity is above 5.5 m/s in comparison with propeller WRPS, which are never repaying. WRPS BONI-ShHV are made on the plants of Republic of Kazakhstan, and tested in wind velocity range up 45 m/s, have experience of 3 years of operation, showing their reliability and effectiveness. The repayment period of individual WRPS BONI-0.5/6 ShHV is from 10 month to 1 year depending on average annual velocity

  7. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  8. Satellite Remote Sensing in Offshore Wind Energy

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Badger, Merete; Astrup, Poul

    2013-01-01

    Satellite remote sensing of ocean surface winds are presented with focus on wind energy applications. The history on operational and research-based satellite ocean wind mapping is briefly described for passive microwave, scatterometer and synthetic aperture radar (SAR). Currently 6 GW installed...

  9. Wind farm progress in Denmark

    DEFF Research Database (Denmark)

    Frandsen, Sten Tronæs; Andersen, Per Dannemand

    1996-01-01

    The paper presents a status of wind power in Denmark and on the technical and industrial achievements. The present total installed capacity is be the end of 1995 approx. 630 MW, and the contribution to the electric energy generation in Denmark is approx. 4%.......The paper presents a status of wind power in Denmark and on the technical and industrial achievements. The present total installed capacity is be the end of 1995 approx. 630 MW, and the contribution to the electric energy generation in Denmark is approx. 4%....

  10. Current situation of wind energy in the world and Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Alper Kaplan, Yusuf; San, Ismail [Department of Electrical and Electronics Engineering, Anadolu University (Turkey)], email: yakaplan@anadolu.edu.tr, email: isan@anadolu.edu.tr

    2011-07-01

    This paper gives an overview of the current situation of wind power in Turkey and in the world by evaluating installed wind power using current data. It also looks at the political conditions of Turkey in relation to the current installed wind energy power in Turkey compared with that of certain developed countries. The problems encountered are also illustrated as a basis for proposing solutions. Turkey's wind energy potential is 48,000 MW but installed wind power was only 1,329 MW as of 2011. Wind energy is at present one of the most cost-competitive renewable energy technologies in the world when technical, geographical and social issues are taken into consideration. Economic sources should be researched. The development of current potential and the market entry of renewable energy resources requires a legal and regulatory framework that support suitable mechanisms. Local support is recommended together with tax exemptions. Long-term fixed-price guarantees should also be considered by government.

  11. Generation of electricity from wind

    International Nuclear Information System (INIS)

    Debroy, S.K.; Behera, S.; Murty, J.S.

    1997-01-01

    Bulk power can be generated by using a chain of wind mills with the current level of technology. Wind turbine technology has improved considerably resulting in better efficiency, availability and capacity factor including a significant reduction in the cost of manufacture and installation

  12. DOE/NREL supported wind energy activities in Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy related projects which are underway in Indonesia. The first is a USAID/Winrock Wind for Island and Nongovernmental Development (WIND) project. The objectives of this project are to train local nongovernmental organizations (NGOs) in the siting, installation, operation, and maintenance of small wind turbines. Then to install up to 20 wind systems to provide electric power for productive end uses while creating micro-enterprises which will generate enough revenue to sustain the wind energy systems. The second project is a joint Community Power Corporation/PLN (Indonesian National Electric Utility) case study of hybrid power systems in village settings. The objective is to evaluate the economic viability of various hybrid power options for several different situations involving wind/photovoltaics/batteries/diesel. The third project is a World Bank/PLN preliminary market assessment for wind/diesel hybrid systems. The objective is to estimate the size of the total potential market for wind/diesel hybrid power systems in Indonesia. The study will examine both wind retrofits to existing diesel mini-grids and new wind-diesel plants in currently unelectrified villages.

  13. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

  14. V-TECS Guide for Carpenter.

    Science.gov (United States)

    Moore, Charles G.; And Others

    This curriculum guide provides materials for a nine-duty course in carpentry. The nine duties are estimating materials, preparing building site, sharpening tools, building and installing foundation forms, installing rough framing, installing roof components, installing exterior finishes, installing interior finishes, and assembling and…

  15. Wind energy

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This chapter discusses the role wind energy may have in the energy future of the US. The topics discussed in the chapter include historical aspects of wind energy use, the wind energy resource, wind energy technology including intermediate-size and small wind turbines and intermittency of wind power, public attitudes toward wind power, and environmental, siting and land use issues

  16. Cost of wind energy: comparing distant wind resources to local resources in the midwestern United States.

    Science.gov (United States)

    Hoppock, David C; Patiño-Echeverri, Dalia

    2010-11-15

    The best wind sites in the United States are often located far from electricity demand centers and lack transmission access. Local sites that have lower quality wind resources but do not require as much power transmission capacity are an alternative to distant wind resources. In this paper, we explore the trade-offs between developing new wind generation at local sites and installing wind farms at remote sites. We first examine the general relationship between the high capital costs required for local wind development and the relatively lower capital costs required to install a wind farm capable of generating the same electrical output at a remote site,with the results representing the maximum amount an investor should be willing to pay for transmission access. We suggest that this analysis can be used as a first step in comparing potential wind resources to meet a state renewable portfolio standard (RPS). To illustrate, we compare the cost of local wind (∼50 km from the load) to the cost of distant wind requiring new transmission (∼550-750 km from the load) to meet the Illinois RPS. We find that local, lower capacity factor wind sites are the lowest cost option for meeting the Illinois RPS if new long distance transmission is required to access distant, higher capacity factor wind resources. If higher capacity wind sites can be connected to the existing grid at minimal cost, in many cases they will have lower costs.

  17. Three-Dimensional Wind Profiling of Offshore Wind Energy Areas With Airborne Doppler Lidar

    Science.gov (United States)

    Koch, Grady J.; Beyon, Jeffrey Y.; Cowen, Larry J.; Kavaya, Michael J.; Grant, Michael S.

    2014-01-01

    A technique has been developed for imaging the wind field over offshore areas being considered for wind farming. This is accomplished with an eye-safe 2-micrometer wavelength coherent Doppler lidar installed in an aircraft. By raster scanning the aircraft over the wind energy area (WEA), a three-dimensional map of the wind vector can be made. This technique was evaluated in 11 flights over the Virginia and Maryland offshore WEAs. Heights above the ocean surface planned for wind turbines are shown to be within the marine boundary layer, and the wind vector is seen to show variation across the geographical area of interest at turbine heights.

  18. Wind energy development: Danish experiences and international options

    International Nuclear Information System (INIS)

    Frandsen, S.; Hasted, F.; Josephsen, L.; Nielson, J.H.

    1989-01-01

    In Denmark, wind energy makes a visible contribution to energy planning. Since 1976, over 1,800 wind turbine units have been installed in Denmark, representing a capacity of ca 140 MW out of a grid capacity of 8,000 MW. These units are all grid-connected and the unit sizes range from 55 kW to 400 kW. The installed wind energy capacity represents a substantial development of technologies for wind energy utilization during the last 15 years, involving participation from research institutes, electric utilities, private industry, and the national energy administration. A considerable improvement of the technical and economic performance of wind turbines, along with increased reliability and durability, has been strongly supported by comprehensive government programs. In 1985, another large construction program was initiated which will add 100 MW wind power capacity by the end of 1990. Parallel with commercial development, Danish utilities have developed and constructed a number of megawatt-size wind turbines on a pilot basis. In general terms the wind energy resources in Denmark are rather good, and many suitable sites exist, but installed wind energy capacity is limited by the high population density. Consequently, research is being conducted on the feasibility of offshore wind turbines. In other countries, wind energy developments similar to those in Denmark are taking place. In communities with no connection to the national grid, special attention should be paid to hybrid systems such as wind-diesel and hydro-wind systems. A substantial transfer of technology is required for facilitating significant development of hybrid systems in developing countries. 11 refs., 7 figs., 2 tabs

  19. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  20. Wind and load variability in the Nordic countries

    Energy Technology Data Exchange (ETDEWEB)

    Holttinen, H.; Rissanen, S. [VTT Technical Research Centre of Finland, Espoo (Finland); Larsen, X. [Danmarks Tekniske Universitet, Lyngby (Denmark); Loevholm, A. L. [Kjeller Vindteknikk (Norway)

    2013-04-15

    This publication analysed the variability of wind production and load in Denmark, Finland, Sweden, and the Nordic region as a whole, based on real data measured from large-scale wind power during 2009-2011. The Nordic-wide wind power time series was scaled up such that Sweden had same amount of wind power production than Denmark, and Finland and Norway only 50% of the wind power production in Denmark. Wind power production in Denmark and Sweden is somewhat correlated (coefficient 0.7) but less correlation is found between the other countries. The variations from one hour to the next are only weakly correlated between all countries, even between Denmark and Sweden. Largest variations occur when the production is approximately 30-70% of installed capacity and variability is low during periods of light winds. The variability in shorter time scales was less than the hourly variations. During the three years analysed in this publication there were few storm incidents and they did not produce dramatic wind power ramps in the Nordic region. Wind and load variations are not correlated between the countries, which is beneficial from the viewpoint of wind integration. The smoothing effect is shown as reduction of variability from a single country to Nordic-wide wind power. The impact of wind power on the variability that the system experiences is evaluated by analysing the variability of net load with different wind power penetration levels. The Nordic-wide wind power production increases the highest hourly ramps by 2.4% (up) and -3.6% (down) of installed wind power capacity when there is 20% wind power penetration and by 2.7% (up) and -4.7% (down) for 30% wind penetration. These results assess the impacts of variability only. The next step will be assessing the uncertainty from forecast errors. The timing of ramp events, and occurrence of high-wind and low-load are studied. With current wind penetration, low production levels (2-5% of installed wind power) can occur in a

  1. Development of a movable table for a bending magnet with removable guides

    International Nuclear Information System (INIS)

    Shibuya, T.; Ito, I.; Kudoh, H.

    2004-01-01

    We develop the movable table for a bending magnet with removable guides. This table has two parallel rails in order to move the bending magnet smoothly and set it precisely. Especially this table has two removable expanded rail guides. Removing this expanded rail guides allow us to make more enough spaces, for example, to install another insertion devices. We measure the reliability of setting this table by moving this table along the rails. And we found this reliability is less than ±3 μm. We also measure the long-term stability of this table setting. (author)

  2. Wind energy availability above gaps in a forest

    DEFF Research Database (Denmark)

    Sogachev, Andrey; Mann, Jakob; Dellwik, Ebba

    2009-01-01

    installation strategies. The canopy-planetary boundary-layer model SCADIS is used to investigate the effect of forest gap size (within the diameter range of 3 - 75 tree heights, h) on wind energy related variables. A wind turbine was assumed with following features: the hub height and rotor diameter of 3.5h...... were estimated from modelled data. The results show that the effect of the forest gaps with diameters smaller than 55h on wind energy captured by the assumed wind turbine and located in the centre of round low-roughness gap is practically insignificant. The high level of spatial variation of considered......There is a lack of data on availability of wind energy above a forest disturbed by clear-cuts, where a wind energy developer may find an opportunity to install a wind farm. Computational fluid dynamics (CFD) models can provide spatial patterns of wind and turbulence, and help to develop optimal...

  3. Wind Turbine With Concentric Ducts

    Science.gov (United States)

    Muhonen, A. J.

    1983-01-01

    Wind Turbine device is relatively compact and efficient. Converging inner and outer ducts increase pressure difference across blades of wind turbine. Turbine shaft drives alternator housed inside exit cone. Suitable for installation on such existing structures as water towers, barns, houses, and commercial buildings.

  4. China Wind Power Outlook 2010

    International Nuclear Information System (INIS)

    Junfeng, Li; Pengfei, Shi; Hu, Gao

    2010-10-01

    China's wind power can reach 230 GW of installed capacity by 2020, which is equal to 13 times the current capacity of the Three Gorges Dam; its annual electricity output of 464.9 TWh could replace 200 coal fire power plants. In 2009, China led the world in newly installed wind-energy devices, reaching a capacity of 13.8 GW (10,129 turbines) - a rate of one new turbine every hour. In terms of overall capacity, China ranks second, at 25.8 GW. The report projects that by 2020, China's total wind power capacity will reach at least 150GW, possibly up to 230GW, which, if realized, could cut 410 million tons of CO2 emission, or 150 million tons of coal consumption. Compared to multinationals, many Chinese companies are young and lack a strong basis for research and development. Despite a renewable energy policy requiring grid companies to purchase all electricity from wind farms, access to wind power for the grid is frequently lagging behind an unstable, out-dated grid infrastructure. There is also the problem of a lack of incentives and penalties for grid companies, and slow progress in more wind energy technologies.

  5. Wind energy use in Germany. Status 31.12.2012; Windenergienutzung in Deutschland. Stand 31.12.2012

    Energy Technology Data Exchange (ETDEWEB)

    Ender, C. [DEWI GmbH, Wilhelmshaven (Germany)

    2013-02-15

    2012 has been a good year for the development of wind energy world-wide and also for Germany. All in all, the global installed wind power capacity in 2012 was 44,712 MW, which is an increase of 8.4 % compared to last year's figures (Tab. 1). Of the new installations, about 59 per cent were realized in China (13.2 GW) and the USA (13.1 GW), followed by Germany and India. It is interesting to note that for the first time Romania has made it among the TOP 10 countries in 2012. With 923 MW new installed capacity the country achieved the tenth position. [1] The positive market development for Germany was already foreseeable when evaluating the figures for the first six months of 2012, and it was confirmed at the end of the year. Based on the average share of the first half year in the annual result over the last five years, new installations of up to 2,350 MW could be expected. The final installation figures of 2,440 MW even exceeded the forecast. This result is the fourth best in the history of the DEWI-Statistics, only beaten by the installations of the record years 2001 to 2003. The good result is probably partly due to projects promoted because of the Energiewende, but also to repowering projects which are contributing an increasing share in the wind energy development. Older wind turbines from the 1990s have now reached an age where replacement may be considered. This applies especially to turbines that were erected after 1998 and are located in wind priority areas. In concrete figures, according to information supplied by wind turbine manufacturers1 altogether 1,003 new wind turbines (WTGS) with 2,439.66 megawatt (MW) were installed in Germany in 2012 (Fig. 1). This means an increase of 21.5 % compared to the year before. As already mentioned, repowering projects have made a significant contribution to the development. Their share in the new installations is approx. 22 %, plus the use of repowering bonus certificates for 117 dismantled wind turbines. Apart

  6. Wind Noise Reduction in a Non-Porous Subsurface Windscreen

    Science.gov (United States)

    Zuckerwar, Allan J.; Shams, Qamar A.; Knight, H. Keith

    2012-01-01

    Measurements of wind noise reduction were conducted on a box-shaped, subsurface windscreen made of closed cell polyurethane foam. The windscreen was installed in the ground with the lid flush with the ground surface. The wind was generated by means of a fan, situated on the ground, and the wind speed was measured at the center of the windscreen lid with an ultrasonic anemometer. The wind speed was controlled by moving the fan to selected distances from the windscreen. The wind noise was measured on a PCB Piezotronics 3†electret microphone. Wind noise spectra were measured with the microphone exposed directly to the wind (atop the windscreen lid) and with the microphone installed inside the windscreen. The difference between the two spectra comprises the wind noise reduction. At wind speeds of 3, 5, and 7 m/s, the wind noise reduction is typically 15 dB over the frequency range of 0.1-20 Hz.

  7. 2016 State of Wind Development in the United States by Region

    Energy Technology Data Exchange (ETDEWEB)

    Baranowski, Ruth [National Renewable Energy Lab. (NREL), Golden, CO (United States); Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-04-19

    Significant expansion of wind energy development will be required to achieve the scenarios outlined in the U.S. Department of Energy's (DOE)'s Wind Vision: 20% wind energy by 2030 and 35% wind energy by 2050. Wind energy currently provides nearly 5% of the nation's electricity but has the potential to provide much more. The wind industry and the DOE's Wind Energy Technologies Office are addressing technical wind energy challenges, such as reducing turbine costs and increasing energy production and reliability. The Office recognizes that public acceptance of wind energy can be challenging, depending on the proximity of proposed wind farms to local populations. Informed decision makers and communities equipped with unbiased information about the benefits and impacts of wind energy development are better prepared to navigate the sometimes contentious development process. In 2014, DOE established six Regional Resource Centers (RRCs) across the United States to communicate unbiased, credible information about wind energy to stakeholders through regional networks. The RRCs provide ready access to this information to familiarize the public with wind energy; raise awareness about potential benefits and issues; and disseminate data on siting considerations such as turbine sound and wildlife habitat protection. This document summarizes the status and drivers for U.S. wind energy development during 2016. RRC leaders provided a report of wind energy development in their regions, which was combined with findings from National Renewable Energy Laboratory (NREL) researchers to provide an account of the state of the regions, as well as updates on developments in individual states. NREL researchers and state partners added updates for all states that are not directly supported by an RRC. Accounts for each region include updates on renewable portfolio standards, the Clean Power Plan, workforce development, manufacturing and economic development, and individual

  8. Wind energy - The facts. Vol. 3: Industry and employment

    International Nuclear Information System (INIS)

    Jacobsen, Henrik

    2004-01-01

    Since the last Wind Energy - The Facts report published in 1999, the European wind energy industry has made significant progress. There are several ways of monitoring this progress, such as measuring electricity output in MW or kW hours. However, the usual method is to use a measurement of installed capacity, so this chapter demonstrates national markets and their growth in terms of MW capacity installed. Wind experienced a surge of growth in California in the 1980s thanks to a combination of state and federal energy and investment tax credits. From 1980 to 1995, around 1,700 MW of wind capacity was installed and, although there were some turbines of poorer quality, the boom period provided a major export market for European manufacturers, and did much to establish the credibility of the industry. Since then, Europe has turned the tables and consolidated its position as the global market leader. Within Europe, certain countries are particularly strong: the top five in terms of installed capacity being Germany, Spain, Denmark, The Netherlands and Italy. (au)

  9. Wind erosion of soils burned by wildfire

    Science.gov (United States)

    N. S. Wagenbrenner; M. J. Germino; B. K. Lamb; R. B. Foltz; P. R. Robichaud

    2011-01-01

    Wind erosion and aeolian transport processes are largely unstudied in the post-wildfire environment, but recent studies have shown that wind erosion can play a major role in burned landscapes. A wind erosion monitoring system was installed immediately following a wildfire in southeastern Idaho, USA to measure wind erosion from the burned area (Figure 1). This paper...

  10. Trade winds turn on the lights - wind home systems in action

    International Nuclear Information System (INIS)

    Kruse, A.

    1998-01-01

    This article reports on the use of a micro wind turbine designed for domestic use in a house in the Enriquillo village in the Dominican Republic which is in the path of the trade winds. The use of wind home systems for rural electrification, installation of similar systems in the north of the country following the success of the Enriquillo system, the shipping of the windpower kits minus the towers which are to be built locally, and the micro-financing of the project are discussed

  11. Draft South African wind energy technology platform: preliminary wind energy research and development framework

    CSIR Research Space (South Africa)

    Szewczuk, S

    2011-08-01

    Full Text Available The South African Wind Energy Technology Programme (SAWEP) Phase 1 aims to achieve two key strategic outputs that will guide South Africa on wind energy development. One of these outputs is the Wind Atlas for South Africa (WASA) which will play a...

  12. Wind Tunnel Analysis of the Airflow through Insect-Proof Screens and Comparison of Their Effect When Installed in a Mediterranean Greenhouse

    Science.gov (United States)

    López, Alejandro; Molina-Aiz, Francisco D.; Valera, Diego L.; Peña, Araceli

    2016-01-01

    The present work studies the effect of three insect-proof screens with different geometrical and aerodynamic characteristics on the air velocity and temperature inside a Mediterranean multi-span greenhouse with three roof vents and without crops, divided into two independent sectors. First, the insect-proof screens were characterised geometrically by analysing digital images and testing in a low velocity wind tunnel. The wind tunnel tests gave screen discharge coefficient values of Cd,φ of 0.207 for screen 1 (10 × 20 threads·cm−2; porosity φ = 35.0%), 0.151 for screen 2 (13 × 30 threads·cm−2; φ = 26.3%) and 0.325 for screen 3 (10 × 20 threads·cm−2; porosity φ = 36.0%), at an air velocity of 0.25 m·s−1. Secondly, when screens were installed in the greenhouse, we observed a statistical proportionality between the discharge coefficient at the openings and the air velocity ui measured in the centre of the greenhouse, ui = 0.856 Cd + 0.062 (R2 = 0.68 and p-value = 0.012). The inside-outside temperature difference ΔTio diminishes when the inside velocity increases following the statistically significant relationship ΔTio = (−135.85 + 57.88/ui)0.5 (R2 = 0.85 and p-value = 0.0011). Different thread diameters and tension affects the screen thickness, and means that similar porosities may well be associated with very different aerodynamic characteristics. Screens must be characterised by a theoretical function Cd,φ = [(2eμ/Kpρ)·(1/us) + (2eY/Kp0.5)]−0.5 that relates the discharge coefficient of the screen Cd,φ with the air velocity us. This relationship depends on the three parameters that define the aerodynamic behaviour of porous medium: permeability Kp, inertial factor Y and screen thickness e (and on air temperature that determine its density ρ and viscosity μ). However, for a determined temperature of air, the pressure drop-velocity relationship can be characterised only with two parameters: ΔP = aus2 + bus. PMID:27187401

  13. Wind Tunnel Analysis of the Airflow through Insect-Proof Screens and Comparison of Their Effect When Installed in a Mediterranean Greenhouse

    Directory of Open Access Journals (Sweden)

    Alejandro López

    2016-05-01

    Full Text Available The present work studies the effect of three insect-proof screens with different geometrical and aerodynamic characteristics on the air velocity and temperature inside a Mediterranean multi-span greenhouse with three roof vents and without crops, divided into two independent sectors. First, the insect-proof screens were characterised geometrically by analysing digital images and testing in a low velocity wind tunnel. The wind tunnel tests gave screen discharge coefficient values of Cd,φ of 0.207 for screen 1 (10 × 20 threads·cm−2; porosity φ = 35.0%, 0.151 for screen 2 (13 × 30 threads·cm−2; φ = 26.3% and 0.325 for screen 3 (10 × 20 threads·cm−2; porosity φ = 36.0%, at an air velocity of 0.25 m·s−1. Secondly, when screens were installed in the greenhouse, we observed a statistical proportionality between the discharge coefficient at the openings and the air velocity ui measured in the centre of the greenhouse, ui = 0.856 Cd + 0.062 (R2 = 0.68 and p-value = 0.012. The inside-outside temperature difference ΔTio diminishes when the inside velocity increases following the statistically significant relationship ΔTio = (−135.85 + 57.88/ui0.5 (R2 = 0.85 and p-value = 0.0011. Different thread diameters and tension affects the screen thickness, and means that similar porosities may well be associated with very different aerodynamic characteristics. Screens must be characterised by a theoretical function Cd,φ = [(2eμ/Kpρ·(1/us + (2eY/Kp0.5]−0.5 that relates the discharge coefficient of the screen Cd,φ with the air velocity us. This relationship depends on the three parameters that define the aerodynamic behaviour of porous medium: permeability Kp, inertial factor Y and screen thickness e (and on air temperature that determine its density ρ and viscosity μ. However, for a determined temperature of air, the pressure drop-velocity relationship can be characterised only with two parameters: ΔP = aus2 + bus.

  14. Maximizing Energy Capture of Fixed-Pitch Variable-Speed Wind Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, K.; Migliore, P.

    2000-08-01

    Field tests of a variable-speed, stall-regulated wind turbine were conducted at a US Department of Energy Laboratory. A variable-speed generating system, comprising a doubly-fed generator and series-resonant power converter, was installed on a 275-kW, downwind, two-blade wind turbine. Gearbox, generator, and converter efficiency were measured in the laboratory so that rotor aerodynamic efficiency could be determined from field measurement of generator power. The turbine was operated at several discrete rotational speeds to develop power curves for use in formulating variable-speed control strategies. Test results for fixed-speed and variable-speed operation are presented along with discussion and comparison of the variable-speed control methodologies. Where possible, comparisons between fixed-speed and variable-speed operation are shown.

  15. Blyth Harbour wind farm - operational aspects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report is the last in a series of seven on various aspects of the monitoring and evaluation of the Blyth Northumberland off-shore wind farm project. The wind farm was the first to be built in the UK: it consists of two 2MW wind turbines about 1 km from the coast in water of depth 5-6 m. The subject of this report is the actual performance of the wind turbine relative to predicted performance. The study showed up the problems of operating a wind farm at sea and the need for comprehensive testing before installation. The problems encountered were numerous but in no case major. A lightning strike destroyed a turbine blade (for which no replacement was readily available) and there was a cable fault caused by installation deficiencies. Better planning could have avoided lengthy shutdowns. The report covers the availability of the turbines and performance of ancillary equipment.

  16. Post-clip placement MRI following second-look US-guided core biopsy for suspicious lesions identified on breast MRI

    Energy Technology Data Exchange (ETDEWEB)

    Song, Sung Eun [Seoul National University Hospital, Department of Radiology, Seoul (Korea, Republic of); Korea University Anam Hospital, Korea University College of Medicine, Department of Radiology, Seoul (Korea, Republic of); Cho, Nariya [Seoul National University Hospital, Department of Radiology, Seoul (Korea, Republic of); Seoul National University College of Medicine, Department of Radiology, Seoul (Korea, Republic of); Seoul National University Medical Research Centre, Institute of Radiation Medicine, Seoul (Korea, Republic of); Han, Wonshik [Seoul National University Hospital, Department of Surgery, Seoul (Korea, Republic of)

    2017-12-15

    To evaluate whether the post-clip placement MRI following second-look ultrasound (US)-guided core biopsy is useful to confirm the adequate sampling of suspicious lesions identified on breast MRI. Between 2014 and 2016, 31 consecutive women with 34 suspicious lesions that had not been identified on previous mammography or US were detected using MRI. Among them, 26 women with 29 lesions (mean size 1.5 cm, range 0.5-5.8 cm) found by second-look US underwent US-guided biopsy, subsequent clip insertion and post-clip placement MRI. Five women with five lesions that were not found by second-look US underwent MRI-guided biopsy. The technical success rate and lesion characteristics were described. The technical success rate was 96.6% (28/29). One failure case was a benign, 1.1-cm non-mass enhancement. Of the 28 success cases, 23 (82.1%) were masses and 5 (17.9%) were non-mass enhancements; 17 (60.7%) were benign, 4 (14.3%) were high-risk and 7 (25.0%) were malignant lesions. The technical success rate was 100% (28/28) for masses and 83.3% (5/6) for non-mass enhancements. Post-clip placement MRI following US-guided biopsy is useful in confirming the adequate sampling of lesions identified on MRI. This method could be an alternative to MRI-guided biopsy for lesions visible on US. (orig.)

  17. Post-clip placement MRI following second-look US-guided core biopsy for suspicious lesions identified on breast MRI

    International Nuclear Information System (INIS)

    Song, Sung Eun; Cho, Nariya; Han, Wonshik

    2017-01-01

    To evaluate whether the post-clip placement MRI following second-look ultrasound (US)-guided core biopsy is useful to confirm the adequate sampling of suspicious lesions identified on breast MRI. Between 2014 and 2016, 31 consecutive women with 34 suspicious lesions that had not been identified on previous mammography or US were detected using MRI. Among them, 26 women with 29 lesions (mean size 1.5 cm, range 0.5-5.8 cm) found by second-look US underwent US-guided biopsy, subsequent clip insertion and post-clip placement MRI. Five women with five lesions that were not found by second-look US underwent MRI-guided biopsy. The technical success rate and lesion characteristics were described. The technical success rate was 96.6% (28/29). One failure case was a benign, 1.1-cm non-mass enhancement. Of the 28 success cases, 23 (82.1%) were masses and 5 (17.9%) were non-mass enhancements; 17 (60.7%) were benign, 4 (14.3%) were high-risk and 7 (25.0%) were malignant lesions. The technical success rate was 100% (28/28) for masses and 83.3% (5/6) for non-mass enhancements. Post-clip placement MRI following US-guided biopsy is useful in confirming the adequate sampling of lesions identified on MRI. This method could be an alternative to MRI-guided biopsy for lesions visible on US. (orig.)

  18. Urban Wind Energy

    DEFF Research Database (Denmark)

    Beller, Christina

    important for the implementation of wind energy conversion systems are the macro and micro wind climate, the siting within a micro wind climate and the choice of a wind turbine model most appropriate for the selected site. In the frame of this work, all these important elements are analyzed and a row......New trends e.g. in architecture and urban planning are to reduce energy needs. Several technologies are employed to achieve this, and one of the technologies, not new as such, is wind energy. Wind turbines are installed in cities, both by companies and private persons on both old and new buildings....... However, an overview of the energy content of the wind in cities and how consequently turbines shall be designed for such wind climates is lacking. The objective of the present work is to deliver an objective and fundamental overview of the social, practical and physical conditions relevant...

  19. This kind of 'Asparagus' is quite well liked - Wind energy opinion poll

    International Nuclear Information System (INIS)

    Gutknecht, B.

    2002-01-01

    This article discusses the results of a survey made on the public acceptance of wind energy projects in Switzerland and examines the situation in Switzerland with respect to the use of wind power and its promotion. The results of an internet-based survey made within the framework of a dissertation presented at the Swiss Federal Institute of Technology are presented. This work included 3-D visualisations of proposed wind energy installations at various locations. The results of the survey, which showed a high level of acceptance for the installations, are commented on. The author discusses the ecological considerations relevant to the planning of wind turbines and is of the opinion that there is no danger of wind power installations 'shooting up like asparagus' in the Swiss landscape

  20. The 1.5 MW wind turbine of tomorrow

    Energy Technology Data Exchange (ETDEWEB)

    De Wolff, T.J.; Sondergaard, H. [Nordtank Energy Group, Richmond, VA (United States)

    1996-12-31

    The Danish company Nordtank is one of the pioneers within the wind turbine industry. Since 1981 Nordtank has installed worldwide more than 2300 wind turbine generators with a total name plate capacity that is exceeding 350 MW. This paper will describe two major wind turbine technology developments that Nordtank has accomplished during the last year: Site Optimization of Nordtank wind turbines: Nordtank has developed a flexible design concept for its WTGs in the 500/600 kW range, in order to offer the optimal WTG solution for any given site and wind regime. Nordtank`s 1.5 MW wind turbine: In September 1995, Nordtank was the first company to install a commercial 1.5 NM WTG. This paper will document the development process, the design as well as operations of the Nordtank 1.5 MW WTG.

  1. The wind farm business

    International Nuclear Information System (INIS)

    Kirby, T.

    1995-01-01

    This article highlights the tasks to be undertaken by the wind farm business starting with the initial site selection, through the planning stage and the consideration of technical matters, to the implementation and financial aspects. The current situation in the UK with regard to installed wind turbines, public attitude, and future prospects are discussed. (UK)

  2. Validation for Global Solar Wind Prediction Using Ulysses Comparison: Multiple Coronal and Heliospheric Models Installed at the Community Coordinated Modeling Center

    Science.gov (United States)

    Jian, L. K.; MacNeice, P. J.; Mays, M. L.; Taktakishvili, A.; Odstrcil, D.; Jackson, B.; Yu, H.-S.; Riley, P.; Sokolov, I. V.

    2016-01-01

    The prediction of the background global solar wind is a necessary part of space weather forecasting. Several coronal and heliospheric models have been installed and/or recently upgraded at the Community Coordinated Modeling Center (CCMC), including the Wang-Sheely-Arge (WSA)-Enlil model, MHD-Around-a-Sphere (MAS)-Enlil model, Space Weather Modeling Framework (SWMF), and Heliospheric tomography using interplanetary scintillation data. Ulysses recorded the last fast latitudinal scan from southern to northern poles in 2007. By comparing the modeling results with Ulysses observations over seven Carrington rotations, we have extended our third-party validation from the previous near-Earth solar wind to middle to high latitudes, in the same late declining phase of solar cycle 23. Besides visual comparison, wehave quantitatively assessed the models capabilities in reproducing the time series, statistics, and latitudinal variations of solar wind parameters for a specific range of model parameter settings, inputs, and grid configurations available at CCMC. The WSA-Enlil model results vary with three different magnetogram inputs.The MAS-Enlil model captures the solar wind parameters well, despite its underestimation of the speed at middle to high latitudes. The new version of SWMF misses many solar wind variations probably because it uses lower grid resolution than other models. The interplanetary scintillation-tomography cannot capture the latitudinal variations of solar wind well yet. Because the model performance varies with parameter settings which are optimized for different epochs or flow states, the performance metric study provided here can serve as a template that researchers can use to validate the models for the time periods and conditions of interest to them.

  3. Validation for global solar wind prediction using Ulysses comparison: Multiple coronal and heliospheric models installed at the Community Coordinated Modeling Center

    Science.gov (United States)

    Jian, L. K.; MacNeice, P. J.; Mays, M. L.; Taktakishvili, A.; Odstrcil, D.; Jackson, B.; Yu, H.-S.; Riley, P.; Sokolov, I. V.

    2016-08-01

    The prediction of the background global solar wind is a necessary part of space weather forecasting. Several coronal and heliospheric models have been installed and/or recently upgraded at the Community Coordinated Modeling Center (CCMC), including the Wang-Sheely-Arge (WSA)-Enlil model, MHD-Around-a-Sphere (MAS)-Enlil model, Space Weather Modeling Framework (SWMF), and heliospheric tomography using interplanetary scintillation data. Ulysses recorded the last fast latitudinal scan from southern to northern poles in 2007. By comparing the modeling results with Ulysses observations over seven Carrington rotations, we have extended our third-party validation from the previous near-Earth solar wind to middle to high latitudes, in the same late declining phase of solar cycle 23. Besides visual comparison, we have quantitatively assessed the models' capabilities in reproducing the time series, statistics, and latitudinal variations of solar wind parameters for a specific range of model parameter settings, inputs, and grid configurations available at CCMC. The WSA-Enlil model results vary with three different magnetogram inputs. The MAS-Enlil model captures the solar wind parameters well, despite its underestimation of the speed at middle to high latitudes. The new version of SWMF misses many solar wind variations probably because it uses lower grid resolution than other models. The interplanetary scintillation-tomography cannot capture the latitudinal variations of solar wind well yet. Because the model performance varies with parameter settings which are optimized for different epochs or flow states, the performance metric study provided here can serve as a template that researchers can use to validate the models for the time periods and conditions of interest to them.

  4. Collective institutional entrepreneurship and contestations in wind energy in India

    NARCIS (Netherlands)

    Jolly, S.; Raven, R.P.J.M.

    2013-01-01

    With 19550 MW installed in 2013, India is considered a success story in terms of net installed capacity of wind power. Few existing studies on wind energy in India have highlighted the important role of institutions, and most lack a detailed account of how influential institutions came about through

  5. The production of wind-generated electricity

    International Nuclear Information System (INIS)

    2013-11-01

    After some key data on installed wind power and its evolution in the World (notably in China and in the USA), in European countries and in France, an overview of the sector economic evolution in France in terms of jobs in different fields (fabrication, electricity production, studies and installations), this publication comments the various benefits of wind energy and its necessary framework for a sane development. Strengths are discussed: a local and clean energy source, a predictable and manageable energy source, an increasing competitiveness. Issues to be considered are also discussed: control of acoustic and landscape impacts, protection of biodiversity, management of interactions with military, meteorological and civil aviation radars, a necessary more steady and coherent regulation. After a discussion of the possibilities offered by small wind energy installations (between 1 and 36 kW), actions undertaken by the ADEME are overviewed. A conclusion outlines the role of wind energy on the supply-demand balance in the French power system, its contribution to the reduction of greenhouse gas emissions, the positive environmental impact, the importance of societal appropriation, and the importance of developing this sector while keeping on reducing consumptions

  6. Utility scale wind turbines on a grid-connected island: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Dua, Mohit; Manwell, James F.; McGowan, Jon G. [Department of Mechanical and Industrial Engineering, Renewable Energy Research Laboratory (RERL), University of Massachusetts, Amherst, MA 01003 (United States)

    2008-04-15

    This paper analyzes the technical and economic feasibility of installing utility-scale wind turbines on the Fox Islands, located 12 miles from the coast of Maine in the United States. Three locations on the islands, as well as a near offshore site, are analyzed in detail as potential sites for wind turbine installations. As discussed in this work, the logistic problems of transporting and installing wind turbines on the island require innovative solutions. These include locally available amphibious vessels, which can land turbine components at suitable shallow spots on the island, self-erecting towers, which allow use of a smaller crane for installation, and a special turbine foundation suitable for the local ground conditions. In the economic analysis, in addition to standard life-cycle parameters, renewable energy credits (REC) were also included. This work concludes that the installation of sub-megawatt wind turbines on the island is logistically possible and will lead to a reduction in the cost of electricity to the customers. (author)

  7. Lightning protection for wind turbines in Vietnam

    Directory of Open Access Journals (Sweden)

    Thuan Nguyen

    2017-01-01

    Full Text Available Wind energy has become increasingly important in the total electrical energy supply mix in Vietnam over the last few years. Small, kW turbines were installed in isolated areas a decade ago, while wind farms of several MW to few hundred MW are now being connected directly to national grid, with many additional projects in planning or under construction to fulfill an objective of 6% of the total installed capacity by 2030 (approximately 6200 MW of wind energy component. The increase in wind farm generation results in increased damage from lightning. In this paper, the annual frequency of lightning strikes to wind turbines in Vietnam is calculated using electrogeometric model. Reported lightning incidents to three major wind farms in Vietnam are summarized. Possible causes of failure are discussed, and an EMTP simulation for each incident was performed accordingly. The simulations suggest the failure mechanisms as well the potential of improved grounding to reduce lightning induced damage in future windfarms.

  8. High Voltage Power Transmission for Wind Energy

    Science.gov (United States)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  9. Wind for Schools: A Wind Powering America Project

    Science.gov (United States)

    US Department of Energy, 2007

    2007-01-01

    The U.S. Department of Energy's (DOE's) Wind Powering America program (based at the National Renewable Energy Laboratory) sponsors the Wind for Schools Project to raise awareness in rural America about the benefits of wind energy while simultaneously educating college seniors regarding wind energy applications. The three primary project goals of…

  10. A comparative multi-disciplinary policy review in wind energy developments in Europe

    Science.gov (United States)

    Mytilinou, V.; Kolios, A. J.; Di Lorenzo, G.

    2017-09-01

    Over recent decades, European Union countries have committed to increasing their electricity production from renewable energy sources (RESs). Wind energy plays a significant role in a sustainable future. This paper presents a political, economic, social, technological, legal and environmental analysis. Although these countries have made many improvements in their legal frameworks aiming to attract investors and boost the RE sector, there are still challenges. The UK focuses on offshore wind energy, adjusts the economic strategy and changes the legislation context. Germany has the healthiest economic conditions, as it keeps following its initiative to design a new programme for an energy transition from conventional to RESs with emphasis on the onshore. Greece has only a few installations and much room for development but needs to make further changes in the legislation and economy so as to attract more investors in the long term. The purpose of this research is to analyse, highlight and discuss vital aspects of these countries as well as the European environment, with reference to their current wind energy activities. Ultimately, it attempts to give a wider perspective and to serve as a guide for future studies on the wind energy sector.

  11. Income Tax Law: U.S. Armed Forces Training: Instructor Guide.

    Science.gov (United States)

    Internal Revenue Service (Dept. of Treasury), Washington, DC.

    The instructor's guide provides eight detailed lesson plans for instructing military personnel in the preparation of their U.S. Income Tax Returns. The plans cover the following subjects: requirements for filing returns of income and declaration of estimated tax; exemptions; gross income; exclusions and deductions to arrive at adjusted gross…

  12. Scour around Offshore Wind Turbine Foundations

    DEFF Research Database (Denmark)

    Petersen, Thor Ugelvig

    Over the last decades several offshore wind farms have been installed and commissioned in the European waters. Typically the foundations of the wind turbines are protected against scour at the base by installing scour protection with rock dump. The Egmond aan Zee offshore wind farm located about 10...... the performance (stability) of the scour protection and to quantify the edge scour development at the circumference of the scour protection. The survey campaign showed considerable edge scour of up to 2.7 m, which was expected from design considerations. However, no clear information exists on the mechanisms...... causing the edge scour development around scour protections at offshore wind turbine foundations. The purpose of the present thesis is to investigate and explain the development of the edge scour in such applications, and describe the flow mechanism causing the scour. Furthermore, the dissertation also...

  13. The Wind Energy Potential of Kurdistan, Iran

    Science.gov (United States)

    Arefi, Farzad; Moshtagh, Jamal; Moradi, Mohammad

    2014-01-01

    In the current work by using statistical methods and available software, the wind energy assessment of prone regions for installation of wind turbines in, Qorveh, has been investigated. Information was obtained from weather stations of Baneh, Bijar, Zarina, Saqez, Sanandaj, Qorveh, and Marivan. The monthly average and maximum of wind speed were investigated between the years 2000–2010 and the related curves were drawn. The Golobad curve (direction and percentage of dominant wind and calm wind as monthly rate) between the years 1997–2000 was analyzed and drawn with plot software. The ten-minute speed (at 10, 30, and 60 m height) and direction (at 37.5 and 10 m height) wind data were collected from weather stations of Iranian new energy organization. The wind speed distribution during one year was evaluated by using Weibull probability density function (two-parametrical), and the Weibull curve histograms were drawn by MATLAB software. According to the average wind speed of stations and technical specifications of the types of turbines, the suitable wind turbine for the station was selected. Finally, the Divandareh and Qorveh sites with favorable potential were considered for installation of wind turbines and construction of wind farms. PMID:27355042

  14. International wind energy development. World market update 2002. Forecast 2003-2007

    International Nuclear Information System (INIS)

    2003-03-01

    This report highlights the development of the international wind power market during 2002 and the new forecast up to 2007. The data presented includes both supply side and demand side information. With 7,227 MW of new installations the total installed capacity of wind power grew to over 32,000 MW. This is the highest figure ever in a single year. The growth rate of 6% over 2001, however, was the lowest since 1996. In spite of this modest figure, the average growth rate over the past five years (from 1997) has been much higher, at 35.7%, and last year's record growth (2001 over 2000) was 52%. The key features of development during 2002 were: 7,227 MW new installed wind power; cumulative installed capacity by the end of 2002 had reached 32,037 MW, consisting of around 61,500 wind turbines dispersed over more than 40 countries; A major share of new installations took place in Europe, with 85.4% of the total. Germany accounted for 53% of the European total; America fell back form its peak level of 1,745 MW in 2001 to a modest 494 MW in 2002, with the majority installed in the USA; Development in Asia was lower than in 2001; Of the emerging markets in the Far East/Pacific, China and Australia were the only two markets to show growth over 2001; The Top Ten markets in the world are headed by Germany, Spain, Denmark and the USA. Newcomers to the Top Ten markets ranking were Australia and the Netherlands; In terms of cumulative installation, the German market passed the 10,000 MW milestone and is by far the largest market in the world. There were 12,000 MW installed in Germany by end of 2002. Spain became No. 2 with 5,042 MW; Penetration of wind power in the world's electricity supply had reached 0.4% by end of 2002. Ten of the world's roughly 25 suppliers of wind turbines are responsible for more than 90% of total supply in the global market. This trend is continuing, with the Top Ten manufacturers in 2002 delivering 95% of the total record installation. Vestas Wind

  15. Assessing high wind energy penetration

    International Nuclear Information System (INIS)

    Tande, J.O.

    1995-01-01

    In order to convincingly promote installing wind power capacity as a substantial part of the energy supply system, a set of careful analyses must be undertaken. This paper applies a case study concentrated on assessing the cost/benefit of high wind energy penetration. The case study considers expanding the grid connected wind power capacity in Praia, the capital of Cape Verde. The currently installed 1 MW of wind power is estimated to supply close to 10% of the electric energy consumption in 1996. Increasing the wind energy penetration to a higher level is considered viable as the project settings are close to ideal, including a very capable national utility company, Electra, a conventional power supply system based on imported heavy fuel and gas oil, and favourable wind conditions with an estimated annual average of 9.3 m/s at the hub height of the wind turbines. With the applied case study assumptions, simulations with WINSYS over the lifetime of the assessed wind power investment show that investments up to 4.2 MW are economically viable. The economic optimum is found at 2.4 MW reaching an internal rate of return of almost 8% p.a. This 2.4 MW of wind power would, together with the existing wind power, supply over 30% of the electric consumption in 1996. Applying the recommended practices for estimating the cost of wind energy, the life-cycle cost of this 2.4 MW investment is estimated at a 7% discount rate and a 20 year lifetime to 0.26 DKK/kW h. (Author)

  16. Nuclear medicine installations supervisors interactive course (CD-ROM)

    International Nuclear Information System (INIS)

    Williart, A.; Shaw, M.; Tellez, M.

    2000-01-01

    . Each chapter has: At the beginning one schedule of the objectives, in order for the student to realise what are the most important concepts. Basic theoretical knowledge adjusted to the specific guide of the C.S.N., with an actualised bibliographic revision. The fundamental concepts are linked with an interactive dictionary. Explanatory pictures and graphics, with which the student can visualise the concept. A summary at the end. Multichoice questions, aleatoraly chosen by the program from a question database. When the student ends the chapter, the program generates a self-evaluating test. With that the student notices if he has the sufficient knowledge to pass to the following chapter. He can realise if he improves in the study or not, in an enhanced self-learning. Besides there are seminars where the most difficult topics are explained. Some small groups will gather for concrete practical work. Both seminars and experiences are planned for a few weekends, to make easy to attend them. Also the students can be in touch with us in tutorial time, by phone or by e-mail. This course will make easier to more professionals to acquire, by using new information technologies, the necessary knowledge to be Nuclear Medicine Installations Supervisor. (author)

  17. The importance of site selection for setting up a wind turbine

    Energy Technology Data Exchange (ETDEWEB)

    Raghunandan, A.; Gowda, G.; Pandian, A. [MS RAMAIAH Institute of Technology, Bangalore (India); Ramanan, G. [RV College of Engineering, Bangalore (India)

    2012-07-01

    A wind energy system transforms the kinetic energy of the wind into mechanical or electrical energy that can be harnessed for practical use. Building a wind turbine is far more than simply a matter of finding a field or mountaintop where the wind is blowing and plopping one down. A great deal of attention should be given to finding the proper site for a wind turbine. The main factor one should consider is the average speed of the wind over an extended time. Estimation of the wind power potential for a site is the most important requirement for selecting a site for the installation of a wind turbine. Also wind turbines should be sited well above trees, buildings, and other obstacles else, the result will be poor energy production and increased wear and tear on the turbine. One way to get rid of this is to place the wind turbine on a tall tower. When selecting a place for setting up a wind turbine, engineers consider factors such as wind hazards, characteristics of the land that affect wind speed, and the effects of one turbine on nearby turbines in wind farms. The other factors that are important for selecting a site for installation of wind turbines are Hill effect, Roughness, or the amount of friction that Earth's surface exerts on wind, Tunnel effect, Turbulence, Variations in wind speed, Wind obstacles and Wind shear. This paper will emphasis on the necessary inspections which are to be done on the site before installing a Wind Turbine. (Author)

  18. Wind Atlas for Egypt

    DEFF Research Database (Denmark)

    The results of a comprehensive, 8-year wind resource assessment programme in Egypt are presented. The objective has been to provide reliable and accurate wind atlas data sets for evaluating the potential wind power output from large electricityproducing wind turbine installations. The regional wind...... climates of Egypt have been determined by two independent methods: a traditional wind atlas based on observations from more than 30 stations all over Egypt, and a numerical wind atlas based on long-term reanalysis data and a mesoscale model (KAMM). The mean absolute error comparing the two methods is about...... 10% for two large-scale KAMM domains covering all of Egypt, and typically about 5% for several smaller-scale regional domains. The numerical wind atlas covers all of Egypt, whereas the meteorological stations are concentrated in six regions. The Wind Atlas for Egypt represents a significant step...

  19. Wind Atlas for Egypt

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Said Said, Usama; Badger, Jake

    2006-01-01

    The results of a comprehensive, 8-year wind resource assessment programme in Egypt are presented. The objective has been to provide reliable and accurate wind atlas data sets for evaluating the potential wind power output from large electricityproducing wind turbine installations. The regional wind...... climates of Egypt have been determined by two independent methods: a traditional wind atlas based on observations from more than 30 stations all over Egypt, and a numerical wind atlas based on long-term reanalysis data and a mesoscale model (KAMM). The mean absolute error comparing the two methods is about...... 10% for two large-scale KAMM domains covering all of Egypt, and typically about 5% for several smaller-scale regional domains. The numerical wind atlas covers all of Egypt, whereas the meteorological stations are concentrated in six regions. The Wind Atlas for Egypt represents a significant step...

  20. Wind power - An impulse or just frustration for business?

    International Nuclear Information System (INIS)

    Wellstein, J.

    2005-01-01

    This article deals with the question raised as to whether the development of wind power can provide an impulse for industry. The answers provided by Markus Geissmann from the Swiss Federal Office of Energy (SFOE) and Robert Horbaty, head of 'Suisse Eole' - a Swiss society that supports the use of wind energy - are presented in the form of an interview. In particular, the fact that certain Swiss manufacturers have established themselves in the international wind energy market is discussed - in spite of the relatively low proportion of wind energy actually generated in Switzerland. The various factors influencing both on-shore and off-shore wind-power installations are discussed. The products and services offered are discussed and also the up-and-coming market for the replacement of older wind-power installations is looked at

  1. Collective institutional entrepreneurship and contestations in wind energy in India

    NARCIS (Netherlands)

    Jolly, Suyash; Raven, Rob|info:eu-repo/dai/nl/41331927X

    2015-01-01

    With 21,136MW of wind energy installed in 2014, India is considered a success story in terms of net installed capacity. Few existing studies on Indian wind energy have highlighted the important role of institutions, and how they stemmed from the work of advocacy groups; studies also tend to focus on

  2. Community Wind: Once Again Pushing the Envelope of Project Finance

    Energy Technology Data Exchange (ETDEWEB)

    bolinger, Mark A.

    2011-01-18

    In the United States, the 'community wind' sector - loosely defined here as consisting of relatively small utility-scale wind power projects that sell power on the wholesale market and that are developed and owned primarily by local investors - has historically served as a 'test bed' or 'proving grounds' for up-and-coming wind turbine manufacturers that are trying to break into the U.S. wind power market. For example, community wind projects - and primarily those located in the state of Minnesota - have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010), Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Thus far, one of these turbine manufacturers - Suzlon - has subsequently achieved some success in the broader U.S. wind market as well. Just as it has provided a proving grounds for new turbines, so too has the community wind sector served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the special allocation partnership flip structure (see Figure 1 in Section 2.1) - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adopted by the broader wind market. More recently, a handful of community wind projects built over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures involving strategic tax equity investors. These include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure

  3. Potential climatic impacts and reliability of large-scale offshore wind farms

    International Nuclear Information System (INIS)

    Wang Chien; Prinn, Ronald G

    2011-01-01

    The vast availability of wind power has fueled substantial interest in this renewable energy source as a potential near-zero greenhouse gas emission technology for meeting future world energy needs while addressing the climate change issue. However, in order to provide even a fraction of the estimated future energy needs, a large-scale deployment of wind turbines (several million) is required. The consequent environmental impacts, and the inherent reliability of such a large-scale usage of intermittent wind power would have to be carefully assessed, in addition to the need to lower the high current unit wind power costs. Our previous study (Wang and Prinn 2010 Atmos. Chem. Phys. 10 2053) using a three-dimensional climate model suggested that a large deployment of wind turbines over land to meet about 10% of predicted world energy needs in 2100 could lead to a significant temperature increase in the lower atmosphere over the installed regions. A global-scale perturbation to the general circulation patterns as well as to the cloud and precipitation distribution was also predicted. In the later study reported here, we conducted a set of six additional model simulations using an improved climate model to further address the potential environmental and intermittency issues of large-scale deployment of offshore wind turbines for differing installation areas and spatial densities. In contrast to the previous land installation results, the offshore wind turbine installations are found to cause a surface cooling over the installed offshore regions. This cooling is due principally to the enhanced latent heat flux from the sea surface to lower atmosphere, driven by an increase in turbulent mixing caused by the wind turbines which was not entirely offset by the concurrent reduction of mean wind kinetic energy. We found that the perturbation of the large-scale deployment of offshore wind turbines to the global climate is relatively small compared to the case of land

  4. Wind energy barometer - EurObserv'ER - February 2015

    International Nuclear Information System (INIS)

    2015-02-01

    The 2014 global wind energy market surged and set a new record after the previous year's slowdown. More than 52 GW of capacity was installed across the world compared to a little less than 37 GW in 2013. Global wind energy took a 41.4% leap in 2014 to culminate in more than 371 GW of installed capacity

  5. Solar and wind potentialities in Mauritania. Presentation of pumping

    International Nuclear Information System (INIS)

    Adell, A.; Fagel, L.

    1996-01-01

    The programs of rural hydraulics based upon the use of renewable energies, either solar or wind, have gained in importance in Africa during the last decade; particularly in Mauritania, a Sahelian country, which is extending widely beyond the western edge of Sahara. This country has been hardly affected by the prolonged droughts which have recently struck this region. Water is a major problem here. Important projects appeared concerning the pumping of water with the help of solar photovoltaic systems and wind mechanical pumps; other processes are being studied: pumping with aero-generators, sea water desalinating... Today Mauritania is at the top of countries of the subregion concerning the number of installations of wind mechanical pumps. The meteorological conditions are in fact favourable to such realizations. A technical and economic comparative study of the results of functioning obtained on the field with a photovoltaic pumping installation and a wind pumping installation, is presented: better technical performances and greater reliability for the photovoltaic pump, lower cost and technological mastery for the wind pump. (author). 9 refs., 8 figs

  6. Wind Energy: Trends And Enabling Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Devabhaktuni, Vijay; Alam, Mansoor; Boyapati, Premchand; Chandna, Pankaj; Kumar, Ashok; Lack, Lewis; Nims, Douglas; Wang, Lingfeng

    2010-09-15

    With attention now focused on the damaging impact of greenhouse gases, wind energy is rapidly emerging as a low carbon, resource efficient, cost-effective sustainable technology in many parts of the world. Despite higher economic costs, offshore appears to be the next big step in wind energy development alternative because of the space scarcity for installation of onshore wind turbine. This paper presents the importance of off-shore wind energy, the wind farm layout design, the off-shore wind turbine technological developments, the role of sensors and the smart grid, and the challenges and future trends of wind energy.

  7. U.S. Army weapon systems human-computer interface style guide. Version 2

    Energy Technology Data Exchange (ETDEWEB)

    Avery, L.W.; O`Mara, P.A.; Shepard, A.P.; Donohoo, D.T.

    1997-12-31

    A stated goal of the US Army has been the standardization of the human computer interfaces (HCIs) of its system. Some of the tools being used to accomplish this standardization are HCI design guidelines and style guides. Currently, the Army is employing a number of HCI design guidance documents. While these style guides provide good guidance for the command, control, communications, computers, and intelligence (C4I) domain, they do not necessarily represent the more unique requirements of the Army`s real time and near-real time (RT/NRT) weapon systems. The Office of the Director of Information for Command, Control, Communications, and Computers (DISC4), in conjunction with the Weapon Systems Technical Architecture Working Group (WSTAWG), recognized this need as part of their activities to revise the Army Technical Architecture (ATA), now termed the Joint Technical Architecture-Army (JTA-A). To address this need, DISC4 tasked the Pacific Northwest National Laboratory (PNNL) to develop an Army weapon systems unique HCI style guide, which resulted in the US Army Weapon Systems Human-Computer Interface (WSHCI) Style Guide Version 1. Based on feedback from the user community, DISC4 further tasked PNNL to revise Version 1 and publish Version 2. The intent was to update some of the research and incorporate some enhancements. This document provides that revision. The purpose of this document is to provide HCI design guidance for the RT/NRT Army system domain across the weapon systems subdomains of ground, aviation, missile, and soldier systems. Each subdomain should customize and extend this guidance by developing their domain-specific style guides, which will be used to guide the development of future systems within their subdomains.

  8. Production of electricity from the wind: a preliminary feasibility study for Greece

    Energy Technology Data Exchange (ETDEWEB)

    Galanis, N

    1977-01-01

    Wind statistics for Greece show that the conditions prevailing on the Aegean islands--i.e. considerable amounts of wind energy, small electrical loads and high generation costs--are especially favorable for the installation of wind turbine generators (WTGs). This study gives preliminary design parameters for WTGs at six locations and evaluates their performance. The duration of operation varies from 5000 to 7400 hours annually and the specific production is between 2300 and 3600 kwh/kw. The installation of the WTGs would result in diesel fuel savings corresponding to a month's consumption. Finally, the cost of wind generated electricity will be lower than that from diesel engines one to three years after the installation of the WTGs.

  9. Fiscal 1999 research report. Revision of introduction guidebook for wind power generation; 1999 nendo furyoku hatsuden donyu guide book no kaitei gyomu chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Expectations are rapidly growing higher in Japan, whose energy supply structure is but fragile, that new energies upon introduction and diffusion will help settle emerging environmental problems such as global warming. For the acceleration of new energy introduction, it is necessary to supply autonomous entities etc. planning to adopt new energies with various materials such as basic knowledge of new energies, cases of successful introduction, and procedures to follow for their adoption. Wind power generation has come to attract attention as a environmentally-friendly clean method of energy supply, and there is a strong tendency towards its adoption. Under such circumstances, a guidebook has been prepared, in which study results are systematically written as to the items to consider before local autonomies etc. install their wind power generation systems. The main items in the guidebook are the outlines of wind power generation, wind characteristics, wind power generation system, precedents of wind power generation, how to conduct studies about wind power generation, construction and maintenance of wind power generation systems, procedures, laws, and regulations relating to wind power generation, and government subsidies for wind power development. (NEDO)

  10. Wind Energy Systems

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Ma, Ke

    2017-01-01

    transmission networks at the scale of hundreds of megawatts. As its level of grid penetration has begun to increase dramatically, wind power is starting to have a significant impact on the operation of the modern grid system. Advanced power electronics technologies are being introduced to improve......Wind power now represents a major and growing source of renewable energy. Large wind turbines (with capacities of up to 6-8 MW) are widely installed in power distribution networks. Increasing numbers of onshore and offshore wind farms, acting as power plants, are connected directly to power...... the characteristics of the wind turbines, and make them more suitable for integration into the power grid. Meanwhile, there are some emerging challenges that still need to be addressed. This paper provides an overview and discusses some trends in the power electronics technologies used for wind power generation...

  11. The comprehensive atlas of wind farms in France

    International Nuclear Information System (INIS)

    Le Jannic, N.; Vincent, C.

    2014-01-01

    This article reports the 1075 wind farms installed or planned on the French territory. The figures were collected during the first semester of 2014. The total installed capacity is 8678.9 MW and the planned farms represent a future capacity of 4288.1 MW, the planned farms will enter into operation during the next 3 years. For each farm the following data has been reported: city, operator, capacity and number of wind turbines, manufacturer and date of entry into operation. The wind farms are classified according to the department in which they are located. (A.C.)

  12. Wind power: cost effective generation for the 1990s

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, T [Vestas Wind Systems A/S (Denmark)

    1989-01-01

    Wind power plants have been installed all over the world, notably in California and Denmark. Commercially available wind turbines today are rated from 50 KW to 1 MW with emphasis on the 1 MW range. As the fuel is ''free'' generating costs are identical to the capital, operation and maintenance costs of the plant. An estimate of the unit price of wind power generated electricity in Denmark is comparable to that generated by a coal fired plant. The main environmental impacts of a wind farm are considered. These are visual impact, noise emission, use of (agricultural) space and the impact on wildlife, mainly birds. Finally the installation of a wind farm and its connection to the grid are described. (3 figures, 1 table). (UK)

  13. Numerical assessment of wind turbine blade damage due to contact/impact with tower during installation

    Science.gov (United States)

    Shankar Verma, Amrit; Petter Vedvik, Nils; Gao, Zhen

    2017-12-01

    The use of floating crane vessel for installation of offshore wind turbine blades presents a great challenge in terms of its random motions and is likely to increase the probability of the blade hitting the preassembled tower during lifting operation. To evaluate the consequences of such scenarios and to determine the allowable motions or sea states for such operations, it is very important to understand the damage development in the blade due to impact. The present paper employs the application of high fidelity finite element method to investigate the damage behavior in the blade when the leading edge of the blade hits the tower. A nonlinear time domain structural analysis using ABAQUS was conducted on the DTU 10 MW reference blade model which is based on shell elements. Damage assessment along with the nature of evolution of various energies is examined and presented for two different impact velocities with modified layup stacking sequence at the contact region.

  14. A Framework for Statewide Analysis of Site Suitability, Energy Estimation, Life Cycle Costs, Financial Feasibility and Environmental Assessment of Wind Farms: A Case Study of Indiana

    Science.gov (United States)

    Kumar, Indraneel

    In the last decade, Midwestern states including Indiana have experienced an unprecedented growth in utility scale wind energy farms. For example, by end of 2013, Indiana had 1.5 GW of wind turbines installed, which could provide electrical energy for as many as half-a-million homes. However, there is no statewide systematic framework available for the evaluation of wind farm impacts on endangered species, required necessary setbacks and proximity standards to infrastructure, and life cycle costs. This research is guided to fill that gap and it addresses the following questions. How much land is suitable for wind farm siting in Indiana given the constraints of environmental, ecological, cultural, settlement, physical infrastructure and wind resource parameters? How much wind energy can be obtained? What are the life cycle costs and economic and financial feasibility? Is wind energy production and development in a state an emission free undertaking? The framework developed in the study is applied to a case study of Indiana. A fuzzy logic based AHP (Analytic Hierarchy Process) spatial site suitability analysis for wind energy is formulated. The magnitude of wind energy that could be sited and installed comprises input for economic and financial feasibility analysis for 20-25 years life cycle of wind turbines in Indiana. Monte Carlo simulation is used to account for uncertainty and nonlinearity in various costs and price parameters. Impacts of incentives and cost variables such as production tax credits, costs of capital, and economies of scale are assessed. Further, an economic input-output (IO) based environmental assessment model is developed for wind energy, where costs from financial feasibility analysis constitute the final demand vectors. This customized model for Indiana is used to assess emissions for criteria air pollutants, hazardous air pollutants and greenhouse gases (GHG) across life cycle events of wind turbines. The findings of the case study include

  15. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  16. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  17. Effective policies for renewable energy - the example of China's wind power - lessons for China's photovoltaic power

    International Nuclear Information System (INIS)

    Wang, Qiang

    2010-01-01

    China, one of the global biggest emitter of CO 2 , needs promotion renewable energy to reduce air pollution from its surging fossil fuel use, and to increase its energy supply security. Renewable energy in its infancy needs policy support and market cultivation. Wind power installed capacity has boomed in recent year in China, as a series of effective support policies were adopted. In this paper, I review the main renewable energy policies regarding to China's wind power, including the Wind Power Concession Program, Renewable Energy Law, and a couple of additional laws and regulations. Such policies have effectively reduced the cost of wind power installed capacity, stimulated the localization of wind power manufacture, and driven the company investment in wind power. China is success in wind power installed capacity, however, success in wind-generated electricity has yet achieved, mainly due to the backward grid system and lack of quota system. The paper ends with the recommended best practice of the China's wind power installed capacity might be transferable to China's photovoltaic power generation. (author)

  18. Wind power

    International Nuclear Information System (INIS)

    2009-01-01

    At the end of 2008,the European wind power capacity had risen to 65,247 MW which is a 15,1% increase on 2007. The financial crisis does not appear to have any real consequences of the wind power sector's activity in 2008. At the end of 2008 the European Union accommodated 53,9% of the world's wind power capacity. The top ten countries in terms of installed wind capacities are: 1) Usa with 25,388 MW, 2) Germany with 23,903 MW, 3) Spain with 16,740 MW, 4) China with 12,200 MW, 5) India with 9,645 MW, 6) Italy with 3,736 MW, 7) France with 3,542 MW, 8) U.K. with 3,406 MW, 9) Denmark with 3,166 MW and 10) Portugal with 2,862 MW. (A.C.)

  19. Wind power report Germany 2014

    International Nuclear Information System (INIS)

    Rohrig, Kurt

    2015-01-01

    Record year 2014. In Germany, the expansion figures attained were so high on land and at sea that the overall new installation figure of 5,188 MW surpassed the previous maximum (from 2002) by more than 60%. With an overall capacity of 39,259 MW, for the first time, wind energy in Germany covers 9.7% of gross power consumption. On the global scale a capacity of more than 51,000 MW has been added - another record high for wind energy installations. Power mix. At 161 TWh, renewable energies in Germany covered 27.8% of gross power consumption and provided for the first time more energy than any other energy source. Coming into force of the new REA in August 2014, modified support schemes caused the expansion of biogas plants and large-scale PV installations to falter. The record expansion seen for wind energy can be interpreted as a pull-forward effect due to the tender procedures coming into force in 2017. Grid integration. Loss of production caused by feed-in management measures rose by 44% to 555 GWh as compared to 2012. Wind turbines were affected in 87% of cases but the impact on PV installations is increasing. Power generation must be more flexible and grids expanded to limit loss of production. Of the 23 expansion projects (1,887 km) in the Electricity Grid Expansion Act, just a quarter of them had been realized by the end of 2014 (463 km). In the preliminary analysis results for the 2014 grid development plan, the extent of grid upgrading and conversion was 3050 km. Offshore, the HelWin 1 grid link with a capacity of 580 MW went online. SylWin 1 and BorWin 2, with a total capacity of 1660 MW, are currently being tested in a trial. In the preliminary analysis results for the 2014 offshore grid development plan, grid connections having an overall capacity of 10.3 GW are planned. Onshore. 2014 saw a total of 44 different turbine types installed in Germany. For the first time, virtually the same number of turbines were added in the 3-4 MW class, as in the 2-3 MW

  20. A novel floating offshore wind turbine concept

    DEFF Research Database (Denmark)

    Vita, Luca; Schmidt Paulsen, Uwe; Friis Pedersen, Troels

    2009-01-01

    This paper will present a novel concept of a floating offshore wind turbine. The new concept is intended for vertical-axis wind turbine technology. The main purpose is to increase simplicity and to reduce total costs of an installed offshore wind farm. The concept is intended for deep water...... and large size turbines....

  1. China Wind Power Outlook 2010

    Energy Technology Data Exchange (ETDEWEB)

    Junfeng, Li; Pengfei, Shi; Hu, Gao [Chinese Renewable Energy Industries Association CREIA, Beijing (China)

    2010-10-15

    China's wind power can reach 230 GW of installed capacity by 2020, which is equal to 13 times the current capacity of the Three Gorges Dam; its annual electricity output of 464.9 TWh could replace 200 coal fire power plants. In 2009, China led the world in newly installed wind-energy devices, reaching a capacity of 13.8 GW (10,129 turbines) - a rate of one new turbine every hour. In terms of overall capacity, China ranks second, at 25.8 GW. The report projects that by 2020, China's total wind power capacity will reach at least 150GW, possibly up to 230GW, which, if realized, could cut 410 million tons of CO2 emission, or 150 million tons of coal consumption. Compared to multinationals, many Chinese companies are young and lack a strong basis for research and development. Despite a renewable energy policy requiring grid companies to purchase all electricity from wind farms, access to wind power for the grid is frequently lagging behind an unstable, out-dated grid infrastructure. There is also the problem of a lack of incentives and penalties for grid companies, and slow progress in more wind energy technologies.

  2. KWOC [Key-Word-Out-of-Context] Index of US Nuclear Regulatory Commission Regulatory Guide Series

    International Nuclear Information System (INIS)

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE ''KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series

  3. Electric industry restructuring, ancillary services, and the potential impact on wind

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, B.; Hirst, E. [Oak Ridge National Lab., TN (United States); Parsons, B.; Porter, K. [National Renewable Energy Lab., Golden, CO (United States)] [and others

    1997-12-31

    The new competitive electric power environment raises increased challenges for wind power. The DOE and EPRI wind programs have dealt extensively with the traditional vertically integrated utility planning and operating environment in which the host utility owns the generation (or purchases the power) and provides dispatch and transmission services. Under this traditional environment, 1794 MW of wind power, principally in California, have been successfully integrated into the U.S. electric power system. Another 4200 MW are installed elsewhere in the world. As issues have arisen, such as intermittency and voltage regulation, they have been successfully addressed with accepted power system procedures and practices. For an intermittent, non-dispatchable resource such as wind, new regulatory rules affecting power transmission services, raise questions about which ancillary services wind plants will be able to sell, which they will be required to purchase, and what the economic impacts will be on individual wind projects. This paper begins to look at issues of concern to wind in a restructured electric industry. The paper first briefly looks at the range of unbundled services and comments on their unique significance to wind. To illustrate the concerns that arise with restructuring, the paper then takes a more detailed look at a single service: regulation. Finally, the paper takes a brief look at technologies and strategies that could improve the competitive position of wind.

  4. World trend - a 10% growth per year for small wind turbines

    International Nuclear Information System (INIS)

    Kane, M.

    2016-01-01

    A decline was expected for small wind turbine business with the advent of bigger wind turbines but it is really not the case. In 2014 the growth rate was about 10 % with a cumulated power installed that year of 830 MW for small wind turbines. China (41% of the installed capacity), United-States (30%) and Great-Britain (15%) are the 3 main players. About 1 million wind turbines are operating in the world - it means 8.3% (∼ 70.000 units) more than a year before. (A.C.)

  5. Wind Energy for Sustainable Development

    International Nuclear Information System (INIS)

    Comsan, M.N.H.

    2009-01-01

    The growing demand in energy and concern about depleting natural resources and global warming has led states worldwide to consider alternatives to the use of fossil fuel for energy production. Several countries especially in Europe have already increased their renewable energy share 6-10%, expected to increase to 20% by the year 2020. For Egypt excellent resources of wind and solar energy exist. The article discusses perspectives of wind energy in Egypt with projections to generate ∼ 3.5 GWe by 2022, representing ∼ 9% of the total installed power at that time (40.2 GW). Total renewable (hydro + wind + solar) are expected to provide ∼ 7.4 GWe by 2022 representing ∼ 19% of the total installed power. Such a share would reduce dependence on depleting oil and gas resources, and hence improve country's sustainable development

  6. World trends in wind energy

    International Nuclear Information System (INIS)

    Kane, Mamadou

    2016-01-01

    A set of articles proposes an overview of some recent, important and characteristic trends in the field of wind energy all over the world. China, with 30,8 GW of newly installed capacities in 2015 has just overtaken the European Union as far as the total installed power is concerned (145 GW against 142 GW). Job growth in the wind energy sector has reached 20 per cent in the USA in 2015. In this country, major companies held 52 per cent of the market in 2015 while a new American research plan has been approved for the development of offshore wind energy. In South Africa, a German company specialised in blade inspection and repair will provide the Obelisk group with its services on blades and towers for wind turbines. As far as the UK is concerned, the article outlines and comments the continuing decrease of production costs. In India, General Electric is about to launch a new technology of digital wind farm which is supposed to improve production by simulating availability and productivity over the farm lifetime while reducing costs. In Norway, a Norwegian company proposes a new battery-based storage solution, Batwind, for offshore wing energy

  7. Wind energy in Denmark and within the Elsam utility area

    International Nuclear Information System (INIS)

    Friis, P.; Grauballe, J.

    1995-01-01

    At the turn of 1994, 3,700 wind turbines, with a total installed capacity of 540 MW were connected to the Danish utility grid. In 1994 these turbines fed 1,118 GWh wind energy into the grid, corresponding to approximately 3.3% of the total electricity consumption. The ELSAM utility area supplies the electric energy consumed by half the Danish population. The area has a large wind energy potential and approx. 75% of the installed wind energy capacity in Denmark is situated here accounting for 400 MW. In 1994 the ELSAM utilities supplied a total of 18,450 GWh with wind power contributing 850 GWh, i.e. 4.6% of the ELSAM sales to the consumers. (Author)

  8. Did accelerated depreciation result in lower generation efficiencies for wind plants in India: An empirical analysis

    International Nuclear Information System (INIS)

    Shrimali, Gireesh; Pusarla, Shreya; Trivedi, Saurabh

    2017-01-01

    India ranks fifth in wind energy installations in the world; with an installed wind capacity is 22 GW at the end of 2014. This has been made possible by a combination of federal financial incentives and state-level feed in tariffs. The federal policies are accelerated depreciation, which allows for higher depreciations in earlier years; and generation based incentive, which provides a premium for each unit of generation. Accelerated depreciation appears to be more effective from deployment and cost perspectives; whereas, generation based incentive is said to be more effective in incentivizing generation. In this paper, using multivariable linear regressions on a sample of approximately 40 wind plants, while controlling for wind regime and wind turbine technology, we investigate the incremental impact of generation based incentive compared to accelerated depreciation. We find that generation based incentive results in at least 3 percentage points higher plant load factors than accelerated depreciation. This indicates that, if higher generation is the goal of renewable policies, generation based incentive should be preferred to accelerated depreciation. This would be similar to the move from investment tax credit to production tax credit in the U.S. - Highlights: • We examine generation effectiveness of federal renewable policies in India. • We examine accelerated depreciation and generation based incentives. • We use a cross-sectional regression analysis on a sample of approx. 40 wind plants. • Generation based incentive results in 3 percentage points higher plant load factor.

  9. Renewable energy and sustainable communities: Alaska's wind generator experience.

    Science.gov (United States)

    Konkel, R Steven

    2013-01-01

    In 1984, the Alaska Department of Commerce and Economic Development (DCED) issued the State's first inventory/economic assessment of wind generators, documenting installed wind generator capacity and the economics of replacing diesel-fuel-generated electricity. Alaska's wind generation capacity had grown from hundreds of installed kilowatts to over 15.3 megawatts (MW) by January 2012. This article reviews data and conclusions presented in "Alaska's Wind Energy Systems; Inventory and Economic Assessment" (1). (Alaska Department of Commerce and Economic Development, S. Konkel, 1984). It provides a foundation and baseline for understanding the development of this renewable energy source. Today's technologies have evolved at an astonishing pace; a typical generator in an Alaska wind farm now is likely rated at 1.5-MW capacity, compared to the single-kilowatt (kW) machines present in 1984. Installed capacity has mushroomed, illustrated by Unalakleet's 600-kW wind farm dwarfing the original three 10-kW machines included in the 1984 inventory. Kodiak Electric had three 1.5-MW turbines installed at Pillar Mountain in 2009, with three additional turbines of 4.5-MW capacity installed in 2012. Utilities now actively plan for wind generation and compete for state funding. State of Alaska energy policy provides the context for energy project decision-making. Substantial renewable energy fund (REF) awards--$202,000,000 to date for 227 REF projects in the first 5 cycles of funding--along with numerous energy conservation programs--are now in place. Increasing investment in wind is driven by multiple factors. Stakeholders have interests both in public policy and meeting private investment objectives. Wind generator investors should consider project economics and potential impacts of energy decisions on human health. Specifically this article considers: changing environmental conditions in remote Alaska villages, impacts associated with climate change on human health, progress in

  10. Status of wind energy in Germany

    Energy Technology Data Exchange (ETDEWEB)

    Gerdes, G.; Molly, J.P.; Rehfeldt, K. [Deutsches Windenergie-Institut, Wilhelmshaven (Germany)

    1996-12-31

    By the end of 1995 in total 3655 wind turbines (WT`s) were installed in Germany with a total capacity of 1,136 MW. In the year 1995 alone the WT installations grew by 1,070 units with 505 MW. About 40% of the 1995 installations were sold to inland states of Germany with their lower wind speed potential. This fast development occurred in parallel to continuously reduced local state and federal subsidies. The further development is based mainly on the guaranteed reimbursement due to the Electricity Feed Law. But since some time the electricity utilities fight back on all legal and political levels to get cancelled the unloved Electricity Feed Law and since two years the building construction law with the foreseen privilege for WT`s is discussed without any result. All these difficulties affect investors and credit giving banks in such a negative way, that the further annual increase in wind power installation for 1996 could be 10 to 20% less than in 1995. Many of the new commercial Megawatt WT`s have pitch control and variable rotor speed which cause better electrical power quality and lower life time loads. From statistical evaluations on technical data of WT`s a good overview of the further development is derived. 8 refs., 10 figs.

  11. Introduction guide book for wind power generation; Furyoku hatsuden donyu guide book

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This paper arranges essential items for introduction of wind power generation to local governments. Natural wind power energy which is free from emission of atmospheric pollutants such as CO2 and probably profitable, is leading regenerative energy among several new energies, and its rapid diffusion is expected. At the end of 1995, a wind power generation facility capacity amounts to 4900MW in the world, 1770MW in USA, 1140MW in Germany, 630MW in Denmark, 550MW in India, and 250MW in the Netherlands. In Japan, its introduction to local governments is in progress with preparation of a purchase system of surplus electric power and a system interconnection guideline. A total facility capacity reached 10MW in 1996, and is scheduled to reach 150MW in fiscal 2010. NEDO`s wind characteristic map of Japan shows many promising areas for power generation. Since these information is not yet well known, the following are summarized: the present state, features of wind condition, power generation systems, application cases, an approach to survey research, construction, maintenance and related laws, and a subsidy system. 31 refs., 48 figs., 40 tabs.

  12. Potential role of power authorities in offshore wind power development in the US

    International Nuclear Information System (INIS)

    Dhanju, Amardeep; Firestone, Jeremy; Kempton, Willett

    2011-01-01

    This article examines how power authorities could facilitate and manage offshore wind power development in US coastal waters. The power authority structure is an American 20th century institution for managing energy resources-a form of a public authority or public corporation dedicated to creating, operating and maintaining electric generation and transmission infrastructure. Offshore wind power is characterized by high capital costs but no fuel costs and thus low operating costs. Therefore a power authority, by virtue of its access to low-cost capital and managerial flexibility, could facilitate offshore wind power development by reducing financial risk of developing and lowering debt payments, thus improving the risk profile and lowering the cost of electricity production. Additionally, power authorities can be made up of multiple states, thus opening the possibility for joint action by neighboring coastal states. Using primary and secondary data, we undertake an in-depth analysis of the potential benefits and shortcomings of a power authority approach. - Highlights: → Proposes an institutional solution in the form of power authority for offshore wind power. → Power authority structure can significantly lower the cost of capital. → Tax-free bond financing available to power authority can significantly reduce the cost of energy. → It can enhance regional collaboration among coastal states to harness the offshore wind potential.

  13. Financing renewables - wind energy

    International Nuclear Information System (INIS)

    Armstrong, J.

    1998-01-01

    This paper describes the status of the wind energy markets world-wide, in Europe and in the UK. It outlines the main methods of financing wind energy installations and discusses why different institutional structures have led to different markets in the UK and in Germany, with some concern about the state of the UK onshore industry. The paper looks ahead to the opening up of the potentially much larger offshore wind resource, concluding that in this area, existing UK development and financing structures are well suited. (Author)

  14. Offshore wind power experiences, potential and key issues for deployment

    Energy Technology Data Exchange (ETDEWEB)

    Lemming, J.; Morthorst, P.E.; Clausen, Niels-Erik

    2009-01-15

    Wind power has been growing at spectacular rates. Today it is the largest non-hydro renewable power technology. Worldwide there is 74 GW of installed capacity which is 1.7% of power generation capacity and in 2006 it accounted for 0.82% of electricity production. However, offshore wind still only counts for a very small amount and development has only taken place in North European counties round the North Sea and the Baltic Sea over the last 15 years. Offshore wind is still some 50% more expensive than onshore wind, but more wind resources and lesser visual impacts from larger turbines are expected to compensate for the higher installation costs in the long term. Most offshore wind farms are installed in British, Swedish and Danish waters, and present-day costs of installing wind energy in the UK are between 1,200 to 1,600 GBP/kW (1,781 to 2,375 Euro/kW) offshore, while in Sweden investment costs were 1,800 Euro/kW, and in Denmark 1,200 to 1,700 Euro/kW, though investment costs for a new wind farm are expected be in the range of 2.0 to 2.2 mill. Euro/MW for a near-shore shallow depth facility. Future developments in offshore wind technology concerning aerodynamics, structural dynamics, structural design, machine elements, electrical design and grid integration could drive investment costs from present-day range of 1.9 to 2.2 mill. Euro/MW down to 1.35 - 1.54 mill.Euro/MW in 2050, which accounts for a reduction of costs of approx. 35%. In order to sum up progress and identify future research needs, the International Energy Agency (IEA) Wind agreement Task 11 should arrange a new meeting concerning long term research needs for reviewing 'the long term strategy for 2000 to 2020' from 2001, to come up with suggestions / recommendations on how to define and proceed with, the necessary research activities of the IEA Wind Agreement and governments involved on key wind issues related to offshore technologies. (au)

  15. Forecast of the installed capacity for renewable energy installations and its influence on the grid extensions in the State of Brandenburg

    Energy Technology Data Exchange (ETDEWEB)

    Schwarz, Harald; Pfeiffer, Klaus [Brandenburgische Technische Univ. Cottbus (Germany); Zeidler, Jens [MITNETZ Strom, Halle/Saale (Germany); Schulz, Stephan [50Hertz Transmission, Berlin (Germany); Dorendorf, Stefan [E.ON edis, Fuerstenwalde (Germany)

    2012-07-01

    Development of installations for renewable electrical generation forced by the Federal Government of Germany causes an increased expansion of wind, photovoltaic and biomass installations, especially in the plain states, such as Brandenburg in Germany. Therefore, a study on grid integration of renewable energy in the state of Brandenburg was commissioned on behalf of the Brandenburg Ministry of Economics and European Affairs. The work tasks of the study, on the one hand, consisted of comprehensive forecast for the renewable energy sources such as wind, biomass and photovoltaic. On the other hand, grid calculations for the evaluation of plausibility of the existing grid extension concepts of network operators in Brandenburg were conducted based on this forecast. The results of this study are to be presented to general public in this contribution. (orig.)

  16. Wake losses optimization of offshore wind farms with moveable floating wind turbines

    International Nuclear Information System (INIS)

    Rodrigues, S.F.; Teixeira Pinto, R.; Soleimanzadeh, M.; Bosman, Peter A.N.; Bauer, P.

    2015-01-01

    Highlights: • We present a layout optimization framework for wind farms with moveable turbines. • Using moveable wind turbines in optimized layouts maximizes energy production. • Turbine and wind farm designers should cooperate to optimize offshore wind projects. - Abstract: In the future, floating wind turbines could be used to harvest energy in deep offshore areas where higher wind mean speeds are observed. Currently, several floating turbine concepts are being designed and tested in small scale projects; in particular, one concept allows the turbine to move after installation. This article presents a novel layout optimization framework for wind farms composed of moveable floating turbines. The proposed framework uses an evolutionary optimization strategy in a nested configuration which simultaneously optimizes the anchoring locations and the wind turbine position within the mooring lines for each individual wind direction. The results show that maximum energy production is obtained when moveable wind turbines are deployed in an optimized layout. In conclusion, the framework represents a new design optimization tool for future offshore wind farms composed of moveable floating turbines

  17. IEA Wind Task 26: Offshore Wind Farm Baseline Documentation

    Energy Technology Data Exchange (ETDEWEB)

    Smart, Gavin [Offshore Renewable Energy Catapult, Blyth, Northumberland (United Kingdom); Smith, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Warner, Ethan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sperstad, Iver Bakken [SINTEF Energy Research, Trondheim (Norway); Prinsen, Bob [Ecofys, Utrecht (Netherlands). TKI Wind Op Zee; Lacal-Arantegui, Roberto [European Commission Joint Research Centre (JRC), Brussels (Belgium)

    2016-06-02

    This document has been produced to provide the definition and rationale for the Baseline Offshore Wind Farm established within IEA Wind Task 26--Cost of Wind Energy. The Baseline has been developed to provide a common starting point for country comparisons and sensitivity analysis on key offshore wind cost and value drivers. The baseline project reflects an approximate average of the characteristics of projects installed between 2012 and 2014, with the project life assumed to be 20 years. The baseline wind farm is located 40 kilometres (km) from construction and operations and maintenance (O&M) ports and from export cable landfall. The wind farm consists of 100 4-megawatt (MW) wind turbines mounted on monopile foundations in an average water depth of 25 metres (m), connected by 33-kilovolt (kV) inter-array cables. The arrays are connected to a single offshore substation (33kV/220kV) mounted on a jacket foundation, with the substation connected via a single 220kV export cable to an onshore substation, 10km from landfall. The wind farm employs a port-based O&M strategy using crew-transfer vessels.

  18. Impact of active and break wind spells on the demand-supply balance in wind energy in India

    Science.gov (United States)

    Kulkarni, Sumeet; Deo, M. C.; Ghosh, Subimal

    2018-02-01

    With an installed capacity of over 19,000 MW, the wind power currently accounts for almost 70% of the total installed capacity among the renewable energy sector in India. The extraction of wind power mainly depends on prevailing meteorology which is strongly influenced by monsoon variability. The monsoon season is characterized by significant fluctuations in between periods of wet and dry spells. During the dry spells, the demand for power from agriculture and cooling equipment increases, whereas during the wet periods, such demand reduces, although, at the same time, the power supply increases because of strong westerly winds contributing to an enhanced production of wind energy. At this backdrop, we aim to assess the impact of intra-seasonal wind variability on the balance of energy supply and demand during monsoon seasons in India. Further, we explore the probable cause of wind variability by relating it to El Nino events. It is observed that the active and break phases in wind significantly impact the overall wind potential output. Although the dry spells are generally found to reduce the overall wind potential, their impact on the potential seems to have declined after the year 2000. The impact of meteorological changes on variations in wind power studied in this work should find applications typically in taking investment decisions on conventional generation facilities, like thermal, which are currently used to maintain the balance of power supply and demand.

  19. Cherokee Wind Energy Development - Feasibility and Pre-Construction Studies

    Energy Technology Data Exchange (ETDEWEB)

    McMillan, Andy [Cherokee Nation Businesses, LLC, Catoosa, OK (United States)

    2017-06-30

    Cherokee Nation Businesses (CNB) received a grant from the US Department of Energy to explore feasibility and pursue development of a wind power generation facility on Cherokee land in north-central Oklahoma. This project followed several years of initial study exploring the possibility of commercial-scale wind power generation on primarily agricultural land owned by the Cherokee Nation. This project produced detailed analysis of the legal, financial and market viability of such generation facilities, and encompassed a full technical evaluation of the engineering, environmental, and geotechnical aspects of installing this capacity. During the course of this project, information gleaned from this exploration changed CNB’s thinking about the best course of action for Cherokee participation in the development, eventually moving away from an equity-owner model and towards utilization of the land asset as a resource while mitigating Cherokee financial and operational risk.

  20. Can Weather Radars Help Monitoring and Forecasting Wind Power Fluctuations at Large Offshore Wind Farms?

    DEFF Research Database (Denmark)

    Trombe, Pierre-Julien; Pinson, Pierre; Madsen, Henrik

    2011-01-01

    The substantial impact of wind power fluctuations at large offshore wind farms calls for the development of dedicated monitoring and prediction approaches. Based on recent findings, a Local Area Weather Radar (LAWR) was installed at Horns Rev with the aim of improving predictability, controlability...... and potentially maintenance planning. Additional images are available from a Doppler radar covering the same area. The parallel analysis of rain events detection and of regime sequences in wind (and power) fluctuations demonstrates the interest of employing weather radars for a better operation and management...... of offshore wind farms....