Sample records for wind pilot project

  1. Pilot project wind power - Large scale wind power in northern Sweden; Pilotprojekt vindkraft - Storskalig vindkraft i norra Sverige

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Swedish Energy Agency granted 2009-04-20 Svevind AB financial aid to implement {sup P}ilot project wind power- Large scale wind power in northern Sweden{sup .} The purpose of the aid is to implement pilot sub-projects in wind power, to to increase knowledge for the larger establishments. The Energy Agency said in its decision that the projects Dragaliden and Gabriel Mountain is of 'great importance for future large-scale development of wind power in Sweden'. The special conditions prevailing in the project, forest environment and cold climate, gives the possibility of studies of wind turbines on birds, reindeer herding and hunting and the more technical aspects, such as de-icing and obstacle lighting. The objectives of the project, in addition to the construction and operation of 32 wind turbines, has been to include evaluating the permit process, studying the social effects around the wind power, to study the impact on small game hunting, perform tests of the de-icing system, investigate impacts on reindeer herding and explain the outcome of the project-generated rural funds. Some of the above sub-projects have been completed, which are reported in this report. For the sub-projects still in progress, the report presents the results to date, until the completion.

  2. Wind-To-Hydrogen Energy Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Ron Rebenitsch; Randall Bush; Allen Boushee; Brad G. Stevens; Kirk D. Williams; Jeremy Woeste; Ronda Peters; Keith Bennett

    2009-04-24

    WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the

  3. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  4. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  5. Historical review and future perspectives for Pilot Transonic Wind Tunnel of IAE

    Directory of Open Access Journals (Sweden)

    João Batista P. Falcão Filho

    2009-01-01

    Full Text Available The Pilot Transonic Wind Tunnel of Institute of Aeronautics and Space (PTT Pilot Transonic Wind Tunnel is an important result of a tremendous effort to install a high speed wind tunnel complex (TTS acronyms for Transonic and Supersonic Tunnels, in Portuguese at the IAE, to support Brazilian aerospace research. Its history is described below, starting from the moment the TTS project was first conceived, highlighting each successive phase, mentioning the main difficulties encountered, and the solutions chosen, up until the final installation of the Pilot facility. A brief description of the tunnel's shakedown and calibration phases is also given, together with the present campaigns and proposed activities for the near future.

  6. Problems pilots face involving wind shear

    Science.gov (United States)

    Melvin, W. W.

    1977-01-01

    Educating pilots and the aviation industry about wind shears presents a major problem associated with this meteorological phenomenon. The pilot's second most pressing problem is the need for a language to discuss wind shear encounters with other pilots so that the reaction of the aircraft to the wind shear encounter can be accurately described. Another problem is the flight director which gives a centered pitch command for a given angular displacement from the glide slope. It was suggested that they should instead be called flight path command and should not center unless the aircraft is actually correcting to the flight path.

  7. Wind farm project economics : value of wind

    Energy Technology Data Exchange (ETDEWEB)

    Bills-Everett, T. [Mainstream Renewable Power, Toronto, ON (Canada)

    2010-07-01

    This PowerPoint presentation discussed methods of increasing the value of wind power projects. Appropriate turbine selection and layout is needed to ensure that wind resources are fully developed. Construction costs have a significant impact on project costs. The world turbine price index has not significantly fluctuated since 2006. Operating costs, and the value of wind power projects, are linked with OPEX fluctuations. Wind power projects can significantly reduce greenhouse gas (GHG) emissions. An increase in wind power capacity will reduce the overall cost of energy produced from wind power. Countries can use wind power as part of a renewable energy portfolio designed to reduce risks related to diminishing petroleum supplies. Wind power will help to ensure a global transition to renewable energy use. tabs., figs.

  8. Financing wind projects

    International Nuclear Information System (INIS)

    Manson, J.

    2006-01-01

    This presentation reviewed some of the partnership opportunities available from GE Energy. GE Energy's ecomagination commitment has promised to double research investment, make customers true partners and reduce greenhouse gases (GHGs). GE Energy's renewable energy team provides a broad range of financial products, and has recently funded 30 wind farms and 2 large solar projects. The company has a diverse portfolio of technology providers and wind regimes, and is increasing their investment in technology. GE Energy recognizes that the wind industry is growing rapidly and has received increased regulatory support that is backed by strong policy and public support. It is expected that Canada will have 3006 wind projects either planned or under construction by 2007. According to GE Energy, successful wind financing is dependent on the location of the site and its wind resources, as well as on the wind developer's power sales agreement. The success of a wind project is also determined by clear financing goals. Site-specific data is needed to determine the quality of wind resource, and off-site data can also be used to provide validation. Proximity to load centres will help to minimize capital costs. Power sales agreements should be based on the project's realistic net capacity factor as well as on the cost of the turbines. The economics of many wind farms is driven by the size of the turbines used. Public consultations are also needed to ensure the success of wind power projects. It was concluded that a good partner will have staying power in the wind power industry, and will understand the time-lines and needs that are peculiar to wind energy developers. refs., tabs., figs

  9. US/Brazil joint pilot project objectives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

  10. Wind for Schools: A Wind Powering America Project

    Science.gov (United States)

    US Department of Energy, 2007

    2007-01-01

    The U.S. Department of Energy's (DOE's) Wind Powering America program (based at the National Renewable Energy Laboratory) sponsors the Wind for Schools Project to raise awareness in rural America about the benefits of wind energy while simultaneously educating college seniors regarding wind energy applications. The three primary project goals of…

  11. Testing and Commissioning of Lillgrund Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Poul Erik; Larsson, Aake; Jeppsson, Joakim; Toernkvist, Mattias (ed.) (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-04-15

    This report gives an overview of the tests carried out in the Lillgrund project. The report covers factory tests, site tests and the performance tests, which can be carried out during the defects liability period. The report describes tests relevant for the wind turbine generators, the electrical system and the foundations. On the whole, the Lillgrund test results have been satisfactory. One of the more problematic issues experienced were when the foundation interface verification showed that the bolts were not meeting the height requirements. Since this shortcoming was detected relatively early in the project life, it was possible to correct the misalignment and keep the additional costs to a minimum. From a management point of view, this highlighted the importance of clear and unambiguous interface specifications and to make sure that the project has a proper interface management function. According to the Contract, Vattenfall has the right to verify a number of performance parameters during the 5-year defect liability period. The performance tests include availability, power curve, electrical system losses and acoustic noise levels. The contract specifies the test criteria, the test methods and procedures and the penalty if the tests result in undesirable levels. In some cases, there is a financial incentive for the supplier if the tests show that the wind farm is performing better than stipulated in the contract. Lillgrund has performed very well thus far and Vattenfall has determined that the contractual performance requirements are being met. Vattenfall has, therefore, not requested to carry out any of these elective Performance Tests

  12. SAT-WIND project. Final report[Winds from satellites for offshore and coastal wind energy mapping and wind-indexing

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C.B.; Astrup, P.; Nielsen, M. (and others)

    2007-04-15

    The SAT-WIND project 'Winds from satellites for offshore and coastal wind energy mapping and wind-indexing' was a research project funded by STVF/DSF in the years 2003 to 2006 (Sagsnr. 2058-03-0006). The goal of the project was to verify the applicability of satellite wind maps derived from passive microwave, altimeter, scatterometer and imaging Synthetic Aperture Radar (SAR) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas including the North Sea, interior seas and the Baltic Sea. The report describes technical details on the satellite data sources including: 1) passive microwave (SSM/I, AMSR-E), 2) passive microwave polarimetric (WindSat), 3) scatterometer (ERS, QuikSCAT, Midori-2 and NSCAT), 4) altimeter (ERS, Topex, Poseidon, GFO-1, Jason-1), 5) SAR (ERS, Envisat). The SAR wind maps were treated in S-WAsP developed by Risoe National Laboratory in cooperation with GRAS A/S in the innovative project SAT-WIND-SMV (Sagsnr. 2104-05-0084) in the years 2005 and 2006 in parallel with SAT-WIND. The results from the SAT-WIND project are presented. These include ocean wind statistics, offshore wind resource estimates and comparison results for wind-indexing. (au)

  13. SAT-WIND project. Final report[Winds from satellites for offshore and coastal wind energy mapping and wind-indexing

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C B; Astrup, P; Nielsen, M [and others

    2007-04-15

    The SAT-WIND project 'Winds from satellites for offshore and coastal wind energy mapping and wind-indexing' was a research project funded by STVF/DSF in the years 2003 to 2006 (Sagsnr. 2058-03-0006). The goal of the project was to verify the applicability of satellite wind maps derived from passive microwave, altimeter, scatterometer and imaging Synthetic Aperture Radar (SAR) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas including the North Sea, interior seas and the Baltic Sea. The report describes technical details on the satellite data sources including: 1) passive microwave (SSM/I, AMSR-E), 2) passive microwave polarimetric (WindSat), 3) scatterometer (ERS, QuikSCAT, Midori-2 and NSCAT), 4) altimeter (ERS, Topex, Poseidon, GFO-1, Jason-1), 5) SAR (ERS, Envisat). The SAR wind maps were treated in S-WAsP developed by Risoe National Laboratory in cooperation with GRAS A/S in the innovative project SAT-WIND-SMV (Sagsnr. 2104-05-0084) in the years 2005 and 2006 in parallel with SAT-WIND. The results from the SAT-WIND project are presented. These include ocean wind statistics, offshore wind resource estimates and comparison results for wind-indexing. (au)

  14. 7 CFR 1955.132 - Pilot projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  15. Archaeological Handbook for Establishing Offshore Wind Farms in Sweden. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Bengtsson, Boel [Bohuslaens Museum, Uddevalla (Sweden)

    2008-03-15

    The purpose of this handbook is to provide a structured guide for contractors interested in establishing offshore wind farms within Swedish territorial waters and its extended economical zone, in relation to Underwater Cultural Heritage (UCH). It is also applicable to UCH in inland waters. Therefore, this handbook seeks to provide information on; - The management structure of underwater/maritime cultural heritage in Sweden, including institutions and units with maritime antiquarian expertise, - The different types of archaeological remains that can be found around the Swedish coast - in offshore, coastal areas and on the foreshore - which can potentially be affected by offshore wind farm projects, - The laws that underwater archaeological remains are subject to - within the National Maritime Boundary as well as within the contiguous and exclusive economical zones - and the necessary archaeological investigations that need to be considered in order to avoid and/or protect the cultural heritage provided by those remains, - Archaeological standards and methods for assessing and evaluating the potential for finding archaeological remains under water, - The steps that need to be to considered during the planning process of establishing offshore wind farms, and how the contractor and archaeologist can work together in order to make the process more cost effective, and - Considerations for the future. Furthermore, this handbook includes a presentation of archaeological finds made during archaeological surveys in connection with the Lillgrund project. The handbook does not make references to any investigations that may be required in relation to land based archaeological sites other than those which are undertaken close to the shoreline (situated on the foreshore), nor does it consider the visual impact sea-based wind farms might have on cultural heritage

  16. The Lake Turkana wind farm project

    Energy Technology Data Exchange (ETDEWEB)

    Burlando, M.; Durante, F. [DEWI GmbH, Genoa (Italy); Claveri, L. [DEWI GmbH, Oldenburg (Germany)

    2010-08-15

    The Lake Turkana wind farm is one of the largest wind farm projects to be realised in the African Continent, and the first of its kind in Kenya. After its full commissioning in 2012, the wind farm will be generating 300 MW of clean power almost steadily thanks to the very peculiar characteristics of the wind climate of north-western Kenya. Until now, only northern African countries such as Morocco and Egypt had used wind power for commercial purposes on the continent. Projects are now beginning to bloom south of the Sahara as governments realise that harnessing the vast wind potential can efficiently meet the growing demand of electric power. With the Lake Turkana wind farm project and other minor projects, Kenya is trying to lead the way. The project consists of building 365 wind turbines Vestas V52 of hub height 45 m and nominal power 850 kW, corresponding to about 30% of Kenya's current installed power. The project includes also reinforcing 200 km of roads and bridges to transport the wind turbines from the Indian Ocean port of Mombasa to the northwestern Kenya, and adding more than 400 km of transmission lines and several substations to connect the wind farm and supply power to the national electric grid. (orig.)

  17. Mongolia wind resource assessment project

    International Nuclear Information System (INIS)

    Elliott, D.; Chadraa, B.; Natsagdorj, L.

    1998-01-01

    The development of detailed, regional wind-resource distributions and other pertinent wind resource characteristics (e.g., assessment maps and reliable estimates of seasonal, diurnal, and directional) is an important step in planning and accelerating the deployment of wind energy systems. This paper summarizes the approach and methods being used to conduct a wind energy resource assessment of Mongolia. The primary goals of this project are to develop a comprehensive wind energy resource atlas of Mongolia and to establish a wind measurement program in specific regions of Mongolia to identify prospective sites for wind energy projects and to help validate some of the wind resource estimates. The Mongolian wind resource atlas will include detailed, computerized wind power maps and other valuable wind resource characteristic information for the different regions of Mongolia

  18. WINDS (KIZUNA)-based Collaborative e-Learning Project in Thailand, Malaysia and Japan

    Science.gov (United States)

    Hisanaga, Makoto; Takahashi, Shin; Kameyama, Keisuke; Fukui, Yukio; Kitawaki, Nobuhiko

    The expanding digital divide deprives students in developing countries with opportunities for education. Advanced countries have the ability to enhance those opportunities. For this study, the authors set up and tested a remote lecture system using a commercial communication satellite beginning in 2002. This project attempted to solve issues in remote lecture systems using conventional satellite systems, and to build up a real-time collaborative lecture delivery system using a new satellite, called the Wideband InterNetworking engineering test and Demonstration Satellite (WINDS). This work proposes a remote education system using satellites, enabling the issues raised in the pilot experiments to be solved. Principal outcomes in this project include improvements of the quality of image and sound, and the communication delay. The authors also demonstrate the usefulness of WINDS in the education field.

  19. WindNet: Improving the impact assessment of wind power projects

    Directory of Open Access Journals (Sweden)

    Christopher R. Jones

    2014-12-01

    Full Text Available Growing international demand for renewable energy has led to rapid growth in the wind power sector and wind farms are becoming an increasingly common feature of landscapes and seascapes in many countries. However, as the most appropriate locations within established markets are taken up, and as wind power penetrates new markets, there is an increasing likelihood that proposed projects will encroach on sensitive landscapes and residential areas. This will present challenges for the industry, particularly due to the impact that public opinion can have upon the outcomes of planning decisions about specific projects. This article introduces the four key dimensions of the WindNet programme, which are helping to elucidate some of the socio-technical debates that will likely shape the future of the wind power sector. The article outlines studies investigating (1 public responses to cumulative landscape and visual impacts, (2 the auditory impact of wind power projects on human health, (3 the science of wind farm design and its implications for planning, and (4 the relevance of the democratic deficit explanation of the so-called "social gap" in wind farm siting. The outcomes of the research being conducted by WindNet stand to help reduce uncertainty within the planning process and assist in providing a more comprehensive and fairer assessment of the possible impacts associated with wind power project development.

  20. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  1. Distributed Wind Competitiveness Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    2018-02-27

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.

  2. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  3. Model county ordinance for wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Bain, D.A. [Oregon Office of Energy, Portland, OR (United States)

    1997-12-31

    Permitting is a crucial step in the development cycle of a wind project and permits affect the timing, cost, location, feasibility, layout, and impacts of wind projects. Counties often have the lead responsibility for permitting yet few have appropriate siting regulations for wind projects. A model ordinance allows a county to quickly adopt appropriate permitting procedures. The model county wind ordinance developed for use by northwest states is generally applicable across the country and counties seeking to adopt siting or zoning regulations for wind will find it a good starting place. The model includes permitting procedures for wind measurement devices and two types of wind systems. Both discretionary and nondiscretionary standards apply to wind systems and a conditional use permit would be issued. The standards, criteria, conditions for approval, and process procedures are defined for each. Adaptation examples for the four northwest states are provided along with a model Wind Resource Overlay Zone.

  4. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  5. Havsnaes wind farm - The project financing of a Swedish wind farm

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    In March 2008 the ground breaking project financing of the 95 MW Havsnaes wind farm was completed. Havsnaes represents one of the cornerstones in portfolio of Venus Vind, controlled by HgCapital, where sustainable Scandinavian strength is build through industrial scale wind farms with local presence. At the time, Havsnaes represented the largest energy project financing in the market, it is also the first true project financing of a major Swedish wind farm. The aim of this study is to highlight the process of project financing and additional lessons learnt from the Havsnaes transaction. Investment in renewable energy projects often includes international investors. We welcome the growing Swedish wind market, banks and other financial institutions, politicians and other relevant decision makers to take part of our findings. Sponsorship provided by the Swedish Energy Agency has enabled the completion of this study.

  6. Pilot project as enabler?

    DEFF Research Database (Denmark)

    Neisig, Margit; Glimø, Helle; Holm, Catrine Granzow

    This article deals with a systemic perspective on transition. The field of study addressed is a pilot project as enabler of transition in a highly complex polycentric context. From a Luhmannian systemic approach, a framework is created to understand and address barriers of change occurred using...... pilot projects as enabler of transition. Aspects of how to create trust and deal with distrust during a transition are addressed. The transition in focus is the concept of New Public Management and how it is applied in the management of the Employment Service in Denmark. The transition regards...

  7. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  8. Financing innovative technologies in wind projects

    International Nuclear Information System (INIS)

    Vaughan, C.

    2006-01-01

    Methods of market entry and the financing of new technologies were discussed from the perspective of Clipper Windpower, a wind energy company based in the northeastern United States and Canada. Many new technology companies only consider private equity when seeking financing for new product development. However, financing for projects and products is only the first step to market entry. Wind projects are the financial equivalent of a high yield bond with mechanical risk. Many wind power projects with company equity can also be seen as a long term bond with upside in any given year. It is therefore important for wind developers to seek out strategic buyers for both product development and project development, in addition to finding sources of private equity. Clipper Windpower Inc. has developed a partnership with British Petroleum (BP), who hold an equity interest in the company. Both companies are now partnering on projects with Clipper turbines, and firm orders are in place for 2007 and 2008. As a result of the partnership, Clipper now has increased its financial strength in cash flows, balance sheets, and projected revenue. It was concluded that a successful partnership can increase the scale of wind power development, and bring financial sophistication to smaller companies with limited resources. refs., tabs., figs

  9. WindFloat Pacific Project, Final Scientific and Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Banister, Kevin [Principle Power, Inc., Emeryville, CA (United States)

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at the project site and, equally, to other deep water, high wind resource areas around the country.

  10. Hualapai Wind Project Feasibility Report

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, Kevin [Hualapai Tribe; Randall, Mark [Daystar Consulting; Isham, Tom [Power Engineers; Horna, Marion J [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.

    2012-12-20

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  11. Wind Powering America's Wind for Schools Project: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Newcomb, C.

    2012-06-01

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  12. Financing wind energy projects

    International Nuclear Information System (INIS)

    Blom, P.

    1996-01-01

    Triodos Bank has more than 10 years of experience with developing and financing wind projects in the Netherlands. Over 50 Megawatt has been installed with direct involvement of the bank. The experience is both as a bank and as a venture capital fund. In this contribution the perspective will be more from a venture capital point of view than as a bank. The bank's activities in the wind energy sector started in 1986 by forming a joint venture with an engineering bureau, experienced i wind energy but not yet in developing wind projects. From 1989 onwards the joint venture started to build wind farms, both as a private company and in a joint venture with utilities. The European Investment Bank became involved with a long-term debt finance facility (15 years, fixed interest loan). The main difficulties were long-term commitments from landowners (Dike authorities) and utilities with regard to power contracts. The development got really stuck when utilities refused to pay a fair price anymore. Also, site development became more and more difficult. Even the poor technical performance improved drastically and did not frighten developers and banks too much. (author)

  13. New England Wind Energy Education Project (NEWEEP)

    Energy Technology Data Exchange (ETDEWEB)

    Grace, Robert C.; Craddock, Kathryn A.; von Allmen, Daniel R.

    2012-04-25

    Project objective is to develop and disseminate accurate, objective information on critical wind energy issues impacting market acceptance of hundreds of land-based projects and vast off-shore wind developments proposed in the 6-state New England region, thereby accelerating the pace of wind installation from today's 140 MW towards the region's 20% by 2030 goals of 12,500 MW. Methodology: This objective will be accomplished by accumulating, developing, assembling timely, accurate, objective and detailed information representing the 'state of the knowledge' on critical wind energy issues impacting market acceptance, and widely disseminating such information. The target audience includes state agencies and local governments; utilities and grid operators; wind developers; agricultural and environmental groups and other NGOs; research organizations; host communities and the general public, particularly those in communities with planned or operating wind projects. Information will be disseminated through: (a) a series of topic-specific web conference briefings; (b) a one-day NEWEEP conference, back-to-back with a Utility Wind Interest Group one-day regional conference organized for this project; (c) posting briefing and conference materials on the New England Wind Forum (NEWF) web site and featuring the content on NEWF electronic newsletters distributed to an opt-in list of currently over 5000 individuals; (d) through interaction with and participation in Wind Powering America (WPA) state Wind Working Group meetings and WPA's annual All-States Summit, and (e) through the networks of project collaborators. Sustainable Energy Advantage, LLC (lead) and the National Renewable Energy Laboratory will staff the project, directed by an independent Steering Committee composed of a collaborative regional and national network of organizations. Major Participants - the Steering Committee: In addition to the applicants, the initial collaborators committing

  14. Feasibility Study for a Hopi Utility-Scale Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Kendrick Lomayestewa

    2011-05-31

    The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

  15. Alizes: Wind pumping project in Mauritania

    International Nuclear Information System (INIS)

    Monvois, J.; Reboulet, M.

    1991-01-01

    GRET started the title project in May 1990. About 50,000 people live in the area around Rosso, Mauritania, where the project is located. An essential aspect of the project is that villagers themselves need to ask for a wind pump. Moreover, the wind pumps are locally manufactured by a small enterprise. The counterparts are the Mauritanian Ministry of Energy, and the non-gouvernmental Institute Dello and Espace Eolien Regional in France. The Oasis multibladed windmill (2,5 diameter) was chosen, because it is easy to manufacture, it is easy to maintain and quite cheap. To avoid problems it is decided not to pump water from a depth more than 20 meters. The total costs of a wind pump amount to approximately US$ 8,000. for obtaining a wind pump, the villagers need to pay 15% of this total amount. 5 figs., 1 tab

  16. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  17. Wind turbines and transmission systems for offshore wind projects in planning stage

    Energy Technology Data Exchange (ETDEWEB)

    Madariaga, Ander; Martin, Jose Luis; Martinez de Alegria, Inigo; Zamora, Inmaculada [University of the Basque Country (UPV/EHU), Bilbao (Spain). Engineering Faculty; Ceballos, Salvador [Parque Tecnologico de Bizkaia, Derio (Spain). Tecnalia Research and Innovation

    2012-07-01

    This paper reviews the current situation of the offshore wind turbines (OWTs) and the transmission systems (TSs) for offshore wind projects in the planning stage. Bearing in mind that offshore wind projects can last between seven and ten years from the first environmental studies to the commissioning, research engineers from companies and academia consider the solutions already available, but also to the new proposals expected to be ready in time for the project under consideration. Regarding the wind energy conversion systems (WECSs) installed in the OWTs, their main characteristics are reviewed considering turbines in the 4.1 to 10.0 MW range. Regarding the TSs, the current situation of point-to-point HVAC and HVDC links is presented, as well as some ideas related to future DC grids currently under study. (orig.)

  18. Coastal Ohio Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Gorsevski, Peter [Bowling Green State Univ., OH (United States); Afjeh, Abdollah [Univ. of Toledo, OH (United States); Jamali, Mohsin [Univ. of Toledo, OH (United States); Bingman, Verner [Bowling Green State Univ., OH (United States)

    2014-04-04

    The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack

  19. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects, National Research Council

    2007-01-01

    .... Although the use of wind energy to generate electricity is increasing rapidly in the United States, government guidance to help communities and developers evaluate and plan proposed wind-energy projects is lacking...

  20. Danish-Czech wind resource know-how transfer project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rathmann, O.; Noergaerd, P.; Frandsen, S.

    2004-06-01

    The course of the Danish-Czech Wind Resource Know-how Transfer Project is reported. The know-how transfer component of the project has consisted in performing a wind resource training work-shop for about 13 individuals from the Czech Republic, ranging from scientists to wind farm project developers, and in donating modern software for evaluating wind resources. The project has also included a review of a Czech overview-study of wind speeds inside the country as well as an investigation of the electricity tariffs and their impact on wind energy utilization in the Czech Republic. A problematic existing Czech wind farm project, locked up in a no-production situation, was also addressed. Not until the purchase by a new owner-company, which initiated the necessary repair and maintenance, the wind farm resumed normal operation. As its last task, the present project assisted in consolidating future operation through a helping package consisting of a training course for the wind farm technicians and in a package of relevant spare parts. (au)

  1. Financing of wind energy projects

    International Nuclear Information System (INIS)

    Harland, S.

    1991-01-01

    This paper looks at what banks need to know to enable them to consider a wind energy project. The major experiences of banks in financing wind energy have been in the US where governmentally inspired long term sales contracts (PURPA Contracts) have given a security to sponsors and banks not available elsewhere. (Author)

  2. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Christenson, Norm; Walters, Jerel

    2014-12-31

    This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

  3. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  4. Carbon dioxide cleaning pilot project

    International Nuclear Information System (INIS)

    Knight, L.; Blackman, T.E.

    1994-01-01

    In 1989, radioactive-contaminated metal at the Rocky Flats Plant (RFP) was cleaned using a solvent paint stripper (Methylene chloride). One-third of the radioactive material was able to be recycled; two-thirds went to the scrap pile as low-level mixed waste. In addition, waste solvent solutions also required disposal. Not only was this an inefficient process, it was later prohibited by the Resource Conservation and Recovery Act (RCRA), 40 CFR 268. A better way of doing business was needed. In the search for a solution to this situation, it was decided to study the advantages of using a new technology - pelletized carbon dioxide cleaning. A proof of principle demonstration occurred in December 1990 to test whether such a system could clean radioactive-contaminated metal. The proof of principle demonstration was expanded in June 1992 with a pilot project. The purpose of the pilot project was three fold: (1) to clean metal so that it can satisfy free release criteria for residual radioactive contamination at the Rocky Flats Plant (RFP); (2) to compare two different carbon dioxide cleaning systems; and (3) to determine the cost-effectiveness of decontamination process in a production situation and compare the cost of shipping the metal off site for waste disposal. The pilot project was completed in August 1993. The results of the pilot project were: (1) 90% of those items which were decontaminated, successfully met the free release criteria , (2) the Alpheus Model 250 was selected to be used on plantsite and (3) the break even cost of decontaminating the metal vs shipping the contaminated material offsite for disposal was a cleaning rate of 90 pounds per hour, which was easily achieved

  5. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  6. Wind Power:Growing with the Demand of Sustainable Development

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    History review Looking back upon the human history,China is among the earliest countries which make use of wind energy.It started to use the wind energy to pump water for irrigation very long time ago.Since the establishment of the new China,pilot projects of wind energy generation have

  7. Wind energy projects: Some reservations

    International Nuclear Information System (INIS)

    Veldkamp, H.F.; Goezinne, F.

    1991-01-01

    Among people directly involved in wind energy great optimism about the use of windpumps is not uncommon. Projects show that often this is not justified. Why do windpump projects fail? Errors seen by the authors are: 1. Windpumps are installed only because policy makers or researchers want it and not because there is a need felt for them by the users; 2. There is too much attention for the technical side and not for other, more important problems; 3. Experimental (and hence unreliable) windpumps are used in projects; and 4. Too much weight is attached to small, long term economic advantages, which do not count in reality. Although the windmill has its place, it should be recognized that in many cases wind energy is not a good option. 15 refs

  8. Wind project gets boost

    Energy Technology Data Exchange (ETDEWEB)

    Oirere, Shem

    2012-11-01

    The development of a two-phase 100 MW wind power plant project in Tanzania moved a notch higher this year when Export-Import Bank of China extended a US$ 123 million non-concessional loan for its construction.

  9. Danish-Czech wind resource know-how transfer project. Interim report 2002

    Energy Technology Data Exchange (ETDEWEB)

    Rathmann, O.; Noergaerd, P.; Frandsen, S.

    2003-12-01

    The progress of the Danish-Czech Wind Resource Know-how Transfer Project is reported. The know-how transfer component of the project has consisted in performing a wind resource training workshop for about 13 individuals from the Czech Republic, ranging from scientists to wind farm project developers, and in donating modern software for evaluating wind resources. The project has also included a review of a Czech overview-study of wind speeds inside the country as well as a study of the electricity tariffs and their impact on wind energy utilization in the Czech Republic. A problematic existing Czech wind farm project, locked up in a no-production situation, was also addressed. However, this situation turned out to be related to problems with economy and owner-ship to a higher degree than to low wind resources and technical problems, and it was not possible for the project to point out a way out of this situation. (au)

  10. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Joe Jones; Clive Barton; Mark Clayton; Al Yablonsky; David Legere

    2010-09-30

    This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

  11. NSWEP: The Nova Scotia Wind Energy Project

    International Nuclear Information System (INIS)

    Hughes, L.; Little, T. A.

    2000-01-01

    A two-phase project, intended to educate Nova Scotians about the potential of wind power to help reduce the province's greenhouse gas emissions, thereby fulfilling a vital role in Canada's effort to mitigate climate change effects, is described. First phase of the project involves gathering of wind data; the second the installation of a number of wind turbines throughout the province. The data gathering phase encompasses site selection, the actual data gathering for a period of about ten months, data analysis, and creation of a four or five module educational program, to be linked with intermediate high school science, mathematics, geography and social studies curriculum objectives to provide an interdisciplinary examination of these topics, and convey a sense of the complexity of the issues involved. The second phase of the project is intended to promote the possible use of wind energy in the province by installing a number of 25 kW wind turbines at selected sites throughout the province, followed by the gathering analysis of data relating to the amount of power produced by the turbines, calculating the efficiency of turbines and comparing data with the data gathered in previous years. The project is expected to last at least five years, exposing about 4000 high school students to hands-on involvement with issues of climate change and sustainable energy. Parents and the community will be exposed to these same issues indirectly, aided by the relative proximity of the weather stations to schools and the strategic location of the wind turbines. 4 refs

  12. Wake models developed during the Wind Shadow project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, S.; Ott, S.; Pena, A.; Berg, J.; Nielsen, M.; Rathmann, O.; Joergensen, H.

    2011-11-15

    The Wind Shadow project has developed and validated improved models for determining the wakes losses, and thereby the array efficiency of very large, closely packed wind farms. The rationale behind the project has been that the existing software has been covering these types of wind farms poorly, both with respect to the densely packed turbines and the large fetches needed to describe the collective shadow effects of one farm to the next. Further the project has developed the necessary software for the use of the models. Guidelines with recommendations for the use of the models are included in the model deliverables. The project has been carried out as a collaborative project between Risoe DTU, DONG, Vattenfall, DNV and VESTAS, and it has been financed by energinet.dk grant no. 10086. (Author)

  13. Airlie House Pollution Prevention Technology Transfer pilot projects

    Energy Technology Data Exchange (ETDEWEB)

    Thuot, J.R.; Myron, H.; Gatrone, R.; McHenry, J.

    1996-08-01

    The projects were a series of pilot projects developed for DOE with the intention of transferring pollution prevention technology to private industry. The concept was to develop small technology transfer initiatives in partnership with the private sector. Argonne National Laboratory developed three projects: the microscale chemistry in education program, the microscale cost benefit study, and the Bethel New Life recycling trainee program. The two microscale chemistry projects focused on introducing microscale chemistry technologies to secondary and college education. These programs were inexpensive to develop and received excellent evaluations from participants and regulators. The recycle trainee project provided training for two participants and identified recycling and source reduction opportunities in Argonne`s solid waste stream. The pilot projects demonstrated that technology transfer initiatives can be developed and implemented with a small budget and within a short period of time. The essential components of the pilot projects were identification of target technologies that were already available, identification of target audiences, and a focus of effort to achieve a limited but defined objective.

  14. 75 FR 70021 - South Dakota Prairie Winds Project; Partial Term Relinquishment and Release of Easement for Wind...

    Science.gov (United States)

    2010-11-16

    ... requested financing for the project from the RUS. PW SD1 has also submitted an application to the Service to...] South Dakota Prairie Winds Project; Partial Term Relinquishment and Release of Easement for Wind Energy... impact statement (FEIS) on the South Dakota Prairie Winds Project issued by the Department of Energy's...

  15. Community Wind: Once Again Pushing the Envelope of Project Finance

    Energy Technology Data Exchange (ETDEWEB)

    bolinger, Mark A.

    2011-01-18

    In the United States, the 'community wind' sector - loosely defined here as consisting of relatively small utility-scale wind power projects that sell power on the wholesale market and that are developed and owned primarily by local investors - has historically served as a 'test bed' or 'proving grounds' for up-and-coming wind turbine manufacturers that are trying to break into the U.S. wind power market. For example, community wind projects - and primarily those located in the state of Minnesota - have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010), Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Thus far, one of these turbine manufacturers - Suzlon - has subsequently achieved some success in the broader U.S. wind market as well. Just as it has provided a proving grounds for new turbines, so too has the community wind sector served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the special allocation partnership flip structure (see Figure 1 in Section 2.1) - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adopted by the broader wind market. More recently, a handful of community wind projects built over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures involving strategic tax equity investors. These include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure

  16. Attractiveness Evaluation of Investment in Wind Energy Projects

    Directory of Open Access Journals (Sweden)

    Paulius Rudzkis

    2012-07-01

    Full Text Available Last decade as prices of fossil energy resources were almost constantly going upwards, increasing flow of investments is directed to renewable energy resources. Development and application of green energy became one of priority objectives in many countries. While in the context of wind energy production Lithuania lags behind the EU average, its potential of wind energy usage has great perspective. In this article using random processes, cost-benefit and financial analysis, attractiveness of investment in wind energy projects is examined. Given the stochastic nature of wind energy and by looking into investment profitableness and risk factors, effectiveness of wind turbine is evaluated. Analysis showed that wind energy projects could be considered as having high profit-to-risk factor and should generate significant interest of investment community.

  17. The Villas Carrousel PV-Wind Hybrid Project

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz, Jorge M. [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    A pilot project was carried out to supply electrical services for an ecological hotel (eco-hotel), using solar and wind energy in Southeast Mexico. Fifteen small photovoltaic-wind hybrid systems were designed and built by researchers of the Electrical Research Institute of Mexico (IIE), as part of a cooperation agreement with the mexican company Carrousel Operadora Turistica, aimed at developing a technology package to supply electrical services to similar hotels sited in remote areas. Each hybrid system includes one wind generator of 500W nominal capacity, one PV panel ranging in power from 150W to 320 Watts peak, one lead-acid battery bank of 570 ampere-hour in capacity, and an electronic charge controller. This paper describes the systems and summarizes the results from the first twelve months of operation. [Espanol] Se llevo a cabo un proyecto piloto para el suministro de servicios electricos a un hotel ecologico (eco-hotel), utilizando energia solar y energia del viento en el Sudeste de Mexico. Investigadores del Instituto de Investigaciones Electricas de Mexico, disenaron y construyeron quince pequenos sistemas hibridos fotovoltaicos-viento, como parte de un acuerdo de cooperacion con la compania mexicana Carrousel Operadora Turistica, orientado al desarrollo de un paquete tecnologico para proporcionar servicios de energia electrica a hoteles similares ubicados en areas remotas. Cada sistema hibrido incluye un aero-generador con capacidad nominal de 500W un panel foto-voltaico con una potencia que varia entre los 150W y los 320W pico, una banco de baterias de plomo-acido de 570 amperes-hora de capacidad y un controlador electronico de carga. Este articulo describe los sistemas y presenta un resumen de los resultados de los primeros doce meses de operacion.

  18. The Villas Carrousel PV-Wind Hybrid Project

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz, Jorge M [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    A pilot project was carried out to supply electrical services for an ecological hotel (eco-hotel), using solar and wind energy in Southeast Mexico. Fifteen small photovoltaic-wind hybrid systems were designed and built by researchers of the Electrical Research Institute of Mexico (IIE), as part of a cooperation agreement with the mexican company Carrousel Operadora Turistica, aimed at developing a technology package to supply electrical services to similar hotels sited in remote areas. Each hybrid system includes one wind generator of 500W nominal capacity, one PV panel ranging in power from 150W to 320 Watts peak, one lead-acid battery bank of 570 ampere-hour in capacity, and an electronic charge controller. This paper describes the systems and summarizes the results from the first twelve months of operation. [Espanol] Se llevo a cabo un proyecto piloto para el suministro de servicios electricos a un hotel ecologico (eco-hotel), utilizando energia solar y energia del viento en el Sudeste de Mexico. Investigadores del Instituto de Investigaciones Electricas de Mexico, disenaron y construyeron quince pequenos sistemas hibridos fotovoltaicos-viento, como parte de un acuerdo de cooperacion con la compania mexicana Carrousel Operadora Turistica, orientado al desarrollo de un paquete tecnologico para proporcionar servicios de energia electrica a hoteles similares ubicados en areas remotas. Cada sistema hibrido incluye un aero-generador con capacidad nominal de 500W un panel foto-voltaico con una potencia que varia entre los 150W y los 320W pico, una banco de baterias de plomo-acido de 570 amperes-hora de capacidad y un controlador electronico de carga. Este articulo describe los sistemas y presenta un resumen de los resultados de los primeros doce meses de operacion.

  19. The Wind Energy programme - SFOE Research Programme 2000 - 2003; Programm Wind. Konzept BFE-Forschungsprogramm 'Wind' 2000 - 2003

    Energy Technology Data Exchange (ETDEWEB)

    Horbaty, R.

    2001-07-01

    This document, issued by the Swiss Federal Office of Energy (SFOE) describes the concept behind the Swiss wind energy programme. The first part of the report discusses the origins and development of the wind energy programme in Switzerland, discussing the importance of wind energy and policy matters associated with its promotion. The experience gained during the previous research programmes is reviewed. The degree to which targets were reached, promotional activities, the central government's own wind energy activities and the results of a programme evaluation are discussed. Lists of projects that have been realised and activities that have been carried out are presented and positive and negative influences on development are noted. A second part is dedicated to the goals of the wind energy programme in terms of target figures for the year 2010 and the strategies chosen to reach these goals, including pilot and demonstration projects (P and D) and promotional activities. Details of the P and D programme including lists of wind-power projects to be supported, the priorities that have been set and information and further education that is to be provided, are given. New activities in the wind power area such as the development of new type of wind turbine especially suited to alpine conditions are discussed. The role of the Swiss Association for Wind Energy 'Suisse Eole' as a network-partner in the wind energy programme is discussed. An appendix provides details of wind energy projects in Switzerland, market partners and customers. The results of a survey made of wind energy activities at Swiss institutes of higher education are presented.

  20. Overcoming barriers to wind project finance in Australia

    International Nuclear Information System (INIS)

    Kann, Shayle

    2009-01-01

    The wind power industry in Australia is expected to grow rapidly over the next decade, primarily due to a forthcoming expanded national renewable energy target (RET) which will mandate that renewable sources provide approximately 20% of Australia's electricity production by 2020. However, development of new wind generation in Australia has stalled as a result of several barriers to project finance, the mechanism through which most wind farms have been developed historically. This paper provides an overview of wind power financing in Australia in light of recent political and financial trends. Drawing upon existing literature and a series of stakeholder interviews, it identifies three primary barriers to project finance: regulatory risk surrounding legislation of the RET, semi-privatization of electricity retailers in New South Wales, and limited capital availability resulting from the recent global credit crisis. The paper concludes that the confluence of these barriers limits the availability of long-term contracts that provide revenue certainty for pre-construction wind projects, while simultaneously making these contracts a necessity in order to obtain project finance. In an attempt to mitigate these effects, this paper identifies four alternative development strategies that can be pursued.

  1. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  2. Strategies for local community wind energy projects

    International Nuclear Information System (INIS)

    Jenkins, Garry

    1993-01-01

    This paper sets out some near term actions and policies which may improve the prospects for 'local group owned' wind turbines in the UK. Topics covered briefly include the advantages and disadvantages of local group owned wind projects, legal and institutional structures, the scale of projects and investment, subsidies and the NFFO, debt guarantees, public electricity supply franchises and finally the elements of a local ownership strategy for the UK. (UK)

  3. 75 FR 81637 - Commercial Lease for the Cape Wind Energy Project

    Science.gov (United States)

    2010-12-28

    ... Commercial Lease for the Cape Wind Energy Project AGENCY: Bureau of Ocean Energy Management, Regulation and... Renewable Energy Development on the Outer Continental Shelf (``OCS'') for the Cape Wind Energy Project... requirements of 30 CFR 285.231. The Lease is for the Cape Wind Energy Project (``Project'') which grants Cape...

  4. Experiences from the operation of a wind-hydrogen pilot unit

    International Nuclear Information System (INIS)

    Varkaraki, E.; Lymberopoulos, N.; Zoulias, E.; Kalyvas, E.; Christodoulou, C.; Karagiorgis, G.

    2006-01-01

    A pilot wind-hydrogen system has been erected and tested at the wind park of the Centre for Renewable Energy Sources, near Athens, Greece, composed of an alkaline water electrolyser, metal hydride tanks for long term storage and a hydrogen compressor for filling high pressure hydrogen cylinders. The 25 kW electrolyser produces 0.45 kg/h hydrogen under 20 bar pressure, which may be compressed up to 220 bar in one stage. A small conventional tank acts as hydrogen buffer to smooth the pressure and flow variations at the compressor inlet. The metal hydride tanks have a storage capacity of 3.6 kg hydrogen and contain a LaNi5-type alloy. The preliminary results show that the hydrogen system has an overall efficiency of 58%, considering the electrical power of the wind turbine consumed by the whole plant, including utilities. (authors)

  5. Adaptive neuro-fuzzy optimization of wind farm project net profit

    International Nuclear Information System (INIS)

    Shamshirband, Shahaboddin; Petković, Dalibor; Ćojbašić, Žarko; Nikolić, Vlastimir; Anuar, Nor Badrul; Mohd Shuib, Nor Liyana; Mat Kiah, Miss Laiha; Akib, Shatirah

    2014-01-01

    Highlights: • Analyzing of wind farm project investment. • Net present value (NPV) maximization of the wind farm project. • Adaptive neuro-fuzzy (ANFIS) optimization of the number of wind turbines to maximize NPV. • The impact of the variation in the wind farm parameters. • Adaptive neuro fuzzy application. - Abstract: A wind power plant which consists of a group of wind turbines at a specific location is also known as wind farm. To maximize the wind farm net profit, the number of turbines installed in the wind farm should be different in depend on wind farm project investment parameters. In this paper, in order to achieve the maximal net profit of a wind farm, an intelligent optimization scheme based on the adaptive neuro-fuzzy inference system (ANFIS) is applied. As the net profit measures, net present value (NPV) and interest rate of return (IRR) are used. The NPV and IRR are two of the most important criteria for project investment estimating. The general approach in determining the accept/reject/stay in different decision for a project via NPV and IRR is to treat the cash flows as known with certainty. However, even small deviations from the predetermined values may easily invalidate the decision. In the proposed model the ANFIS estimator adjusts the number of turbines installed in the wind farm, for operating at the highest net profit point. The performance of proposed optimizer is confirmed by simulation results. Some outstanding properties of this new estimator are online implementation capability, structural simplicity and its robustness against any changes in wind farm parameters. Based on the simulation results, the effectiveness of the proposed optimization strategy is verified

  6. The Learning Process and Technological Change in Wind Power: Evidence from China's CDM Wind Projects

    Science.gov (United States)

    Tang, Tian; Popp, David

    2016-01-01

    The Clean Development Mechanism (CDM) is a project-based carbon trade mechanism that subsidizes the users of climate-friendly technologies and encourages technology transfer. The CDM has provided financial support for a large share of Chinese wind projects since 2002. Using pooled cross-sectional data of 486 registered CDM wind projects in China…

  7. The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Roberts, A.V.

    1995-01-01

    The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process

  8. Project of a pilot floating wind farm in the Gulf of Lion. Preliminary consultation. Guarantor assessment 27 June - 27 September 2017

    International Nuclear Information System (INIS)

    Brevan, Claude

    2017-01-01

    After an introduction which briefly presents the project of implantation of four floating wind turbines in the Gulf of Lion, this report describes how public consultation has been prepared and performed (information campaign, participation of local authorities and communities, public meetings, workshops, use of social media). It analyses and discusses the main issues addressed during the debates, and lessons learned from them, notably in terms of reactions to the very principle of the project, and in terms of its collective interest, of constraints, of visual impact, of fears related to the behaviour of wind turbines under extreme circumstances, of impact on natural environment and biodiversity, of local economic and tax-related consequences, and of electric connection of the wind turbines to the shore

  9. Consultation and IBA negotiations in wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Merle, Alexander [Bull Housser and Tupper LLP (Canada)

    2011-07-01

    This presentation aimed at providing more information on consultation and IBA negotiations in wind energy projects, it was given by a law firm Bull, Housser and Tupper LLP. The subjects tackled by this paper are: the duty to consult, what First Nations are expecting from IBAs, if IBAs will differ from one wind project to another, if templates assist in achieving equity, who should be responsible for financing IBAs, and whether benefits or payments of money can achieve equity. The presentation emphasised that it is important to cooperate and share information in determining what the role of the Crown should be. In addition, the authors believe that an innovative resolution table should be established and that legal certainty should be obtained. This presentation provided First Nations with useful information on consultation and IBA negotiations in wind energy projects.

  10. Regional hydrogen roadmap. Project development framework for the Sahara Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Benhamou, Khalid [Sahara Wind Inc., Rabat (Morocco); Arbaoui, Abdelaziz [Ecole National Superieure des Arts et Metiers ENSAM Meknes (Morocco); Loudiyi, Khalid [Al Akhawayn Univ. (Morocco); Ould Mustapha, Sidi Mohamed [Nouakchott Univ. (Mauritania). Faculte des Sciences et Techniques

    2010-07-01

    The trade winds that blow along the Atlantic coast from Morocco to Senegal represent one of the the largest and most productive wind potentials available on earth. Because of the erratic nature of winds however, wind electricity cannot be integrated locally on any significant scale, unless mechanisms are developed for storing these intermittent renewable energies. Developing distributed wind energy solutions feeding into smaller electricity markets are essential for solving energy access issues and enabling the development of a local, viable renewable energy industry. These may be critical to address the region's economic challenges currently under pressure from Sub-Saharan migrant populations. Windelectrolysis for the production of hydrogen can be used in grid stabilization, as power storage, fuel or chemical feedstock in specific industries. The objective of the NATO SfP 'Sahara Trade Winds to Hydrogen' project is to support the region's universities through an applied research framework in partnership with industries where electrolysis applications are relevant. By powering two university campuses in Morocco and Mauritania with small grid connected wind turbines and 30 kW electrolyzers generating hydrogen for power back-up as part of ''green campus concepts'' we demonstrated that wind-electrolysis for the production of hydrogen could absorb larger quantities of cheap generated wind electricity in order to maximize renewable energy uptakes within the regions weaker grid infrastructures. Creating synergies with local industries to tap into a widely available renewable energy source opens new possibilities for end users such as utilities or mining industries when processing raw minerals, whose exports generates key incomes in regions most exposed to desertification and climate change issue. Initiated by Sahara Wind Inc. a company from the private sector, along with the Al Akhawayn University, the Ecole Nationale Superieure

  11. Communication Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Annah (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-09-15

    The project of building a large wind farm like Lillgrund, the third largest offshore wind farm in the world, takes a considerable effort when it comes to communication and information. When the main questions 'What should be communicated?', 'To whom should this information be communicated?' and 'How should the information be communicated?' are answered, it is time to take action and actually communicate and inform. A fundamental part of the communication process is psychology. For the entrepreneur to understand that people are worried about the possible change in their living situation and deal with that is essential for how people are going to react to the plans of a potential wind farm. When Vattenfall bought the Lillgrund project a humble tone and availability were two key components in the way in which the project group approached the local residents, authorities and the general public. The goal was to achieve acceptance from the local residents and authorities and make them feel comfortable with the project and Vattenfall. Communication has been a cornerstone of the project during the whole process. A few of the activities that were carried out are media activities, open meetings for the public, exhibitions, advertisements, meetings with authorities, internal and external study visits to the site, cooperation with Malmoe city, participation in conferences and a grand opening ceremony. The basis for the activities has been the active inviting of organisations, neighbours and others. Thanks to the efforts of the whole project group and all others that were involved, the communication process was very successful. The 'Lillgrund model' will be the foundation for coming communication processes and has provided Vattenfall with a lot of experience regarding communication and information issues

  12. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    Science.gov (United States)

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  15. A pilot project on non-conventional learning

    OpenAIRE

    Fernandes, Sara; Cerone, Antonio; Barbosa, L. S.

    2013-01-01

    This poster presents a pilot project on non-conventional learning strategies based on students’ active participation in real-life FLOSS projects. The aim of the project is to validate the hypothesis that the peer-production model, which underlies most FLOSS projects, can enhance the learning-teaching process based on extensive and systematic collaborative practices.

  16. DOE/NREL supported wind energy activities in Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system, also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.

  17. Wind energy generation for electric power production, preliminary studies. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, A

    1976-03-01

    Studies of wind power generation done by SAAB-Scania during 1975 are described. The project deals with generation of electricity for delivery to the transmission system. Both plants with horizontal axis and plants with vertical axis have been studied. A projected pilot plant with a rotor of 18 meter and an effect of 50 kW at 10 m/s wind velocity is described. Suggestions are made for a continuation of the project.

  18. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  19. Bats and bat habitats : guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-03-01

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  20. Bats and bat habitats : guidelines for wind power projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  1. 76 FR 56272 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-09-12

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... cross-border long-haul trucking pilot program to test and demonstrate the ability of Mexico-domiciled...

  2. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat...

  3. 76 FR 56868 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-09-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... proceed with the initiation of a U.S.-Mexico cross-border long-haul trucking pilot program to test and...

  4. 76 FR 73765 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-11-29

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... proceed with the initiation of a U.S.-Mexico cross-border long-haul trucking pilot program to test and...

  5. 76 FR 22719 - Cape Wind Energy Project

    Science.gov (United States)

    2011-04-22

    ... Energy Project AGENCY: Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE), Interior..., or disapprove a Construction and Operations Plan (COP) for the Cape Wind Energy Project located on..., easements, or rights-of-way for renewable energy projects on the OCS. The Secretary delegated that authority...

  6. Systems Performance Analyses of Alaska Wind-Diesel Projects; Kotzebue, Alaska (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.

    2009-04-01

    This fact sheet summarizes a systems performance analysis of the wind-diesel project in Kotzebue, Alaska. Data provided for this project include wind turbine output, average wind speed, average net capacity factor, and optimal net capacity factor based on Alaska Energy Authority wind data, estimated fuel savings, and wind system availability.

  7. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  8. Electronic Government : Caribbean Pilot Project | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Electronic Government : Caribbean Pilot Project. Caribbean countries are increasingly adopting information and communication technologies (ICTs) in ... The Government of Jamaica is willing to donate the solution to other ... Related content ...

  9. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  10. Los Angeles County Metropolitan Transportation Authority climate change adaptation pilot project report.

    Science.gov (United States)

    2013-08-01

    This Climate Change Adaptation Pilot Project Report details the project background of the recently-completed Los Angeles County : Metropolitan Transportation Authority (Metro) Transit Climate Change Adaptation Pilot Project as well as the various wor...

  11. 78 FR 28842 - Searchlight Wind Energy Project Record of Decision (DOE/EIS-0413)

    Science.gov (United States)

    2013-05-16

    ... DEPARTMENT OF ENERGY Western Area Power Administration Searchlight Wind Energy Project Record of...), received a request from Searchlight Wind Energy, LLC (Searchlight) to interconnect its proposed Searchlight Wind Energy Project (Project) to Western's Davis-Mead 230- kilovolt (kV) transmission line. The Project...

  12. Blowing in the wind: evaluating wind energy projects on the national forests

    Science.gov (United States)

    Kerry Schlichting; Evan Mercer

    2011-01-01

    The 650 million ac of federal lands are facing increased scrutiny for wind energy development. As a result, the US Forest Service has been directed to develop policies and procedures for siting wind energy projects. We incorporate geospatial site suitability analysis with applicable policy and management principles to illustrate the use of a Spatial Decision Support...

  13. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  14. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  15. Execution of pilot tests for an uranium in situ leaching project

    International Nuclear Information System (INIS)

    Koch, H.J.

    1983-01-01

    Urangesellschaft is presently evaluating the technical and economic feasibility of an in situ leaching (ISL) project in Wyoming/USA. This report describes the basic technical principles for ISL-uranium projects and gives the reasons for conducting pilot tests prior to the construction of a commercial plant. It further describes the licensing requirements for an ISL-pilot plant and evaluates the results of the pilot tests. (orig.) [de

  16. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Science.gov (United States)

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  17. Economic Development Impacts of Community Wind Projects. A Review and Empirical Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2009-04-01

    "Community wind" refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an "absentee" project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  18. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative

  19. 76 FR 80962 - Notice of Availability of the Record of Decision for the Tule Wind, LLC's Tule Wind Project, San...

    Science.gov (United States)

    2011-12-27

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 49698, LLCAD07000, L51010000.FX0000, LVRWB10B3810] Notice of Availability of the Record of Decision for the Tule Wind, LLC's Tule Wind Project, San..., Inc., filed right-of-way (ROW) application CACA- 51204 for the Tule Wind Project. The project will...

  20. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    Energy Technology Data Exchange (ETDEWEB)

    Sajadi, Amirhossein [Case Western Reserve Univ., Cleveland, OH (United States); Loparo, Kenneth A. [Case Western Reserve Univ., Cleveland, OH (United States); D' Aquila, Robert [General Electric (GE), Albany, NY (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Waligorski, Joseph G. [FirstEnergy, Akron, OH (United States); Baker, Scott [PJM Interconnection, Audubon, PA (United States)

    2016-06-30

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

  1. Benchmarking of wind farm scale wake models in the EERA - DTOC project

    DEFF Research Database (Denmark)

    Réthoré, Pierre-Elouan; Hansen, Kurt Schaldemose; Barthelmie, R.J.

    2013-01-01

    -flow to combine wind farm (micro) and cluster (meso) scale wake models. For this purpose, a benchmark campaign is organized on the existing wind farm wake models available within the project, in order to identify which model would be the most appropriate for this coupling. A number of standardized wake cases......Designing offshore wind farms next to existing or planned wind farm clusters has recently become a common practice in the North Sea. These types of projects face unprecedented challenges in term of wind energy siting. The currently ongoing European project FP7 EERA - DTOC (Design Tool for Offshore...... wind farm Clusters) is aiming at providing a new type of model work-flow to address this issue. The wake modeling part of the EERA - DTOC project is to improve the fundamental understanding of wind turbine wakes and modeling. One of these challenges is to create a new kind of wake modeling work...

  2. Wind Power Statistics Sweden 2009; Vindkraftstatistik 2009

    Energy Technology Data Exchange (ETDEWEB)

    2010-04-15

    In 2009, wind power produced 2.5 TWh, an increase of 26 percent over the previous year. Throughout the period 2003-2009 has production of electricity from wind power almost quadrupled. Sweden's total net production of electricity amounted, according to provisional statistics for 2009, to 133.7 TWh. The year 2007 wind energy's share passed 1.0 percent of total net production of electricity for the first time. In 2008 the proportion was 1.4 percent, and in 2009 to almost 1.9 percent of total net production. Total installed power 2009 was 1448 MW and the number of plants was 1359, an inckW{sub pse} with 363 MW and 198 resp. from 2008. In 2009, there were three main support system for wind power in Sweden: the certificate system; the wind pilot project; and the environmental bonus. The electricity certificate system is a market-based support system for electricity generation from renewables which includes wind power as one of the approved techniques. The system was introduced in 2003 and aims to increase the production of electricity from renewable energy sources by 25 TWh from 2002 levels by 2020.. Wind pilot support is a support to the market for large-scale wind power. Support aims to reduce the cost of the creation of new wind energy and promoting new technologies. Wind Pilot Aid, which has existed since 2003, has been extended until in 2012 and has increased by 350 million SEK (about 36 M Euro) for the period 2008-2012. The environmental bonus, which means a tax subsidy, has been stepped down for each year until and by the year 2009, which was the last year. In 2009, environmental bonus was 0.12 SEK/kWh for electricity from offshore wind. For onshore wind power the environmentally bonus ceased in 2008

  3. Workplace Literacy Pilot Projects: A Discussion Paper = Les Projects-pilotes en alphabetisation en milieu de travail: document de discussion.

    Science.gov (United States)

    de Wolff, Alice

    From 1995-1998, 12 of the 79 organizations funded by Canada's National Literacy Secretariat (NLS) conducted approximately 40 workplace literacy pilot projects across Canada. Those projects were reviewed to determine their effectiveness in increasing the number and quality of Canadian workplace literacy programs. Information for the review was…

  4. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  5. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  6. Harmonisation of wind turbine certification in Europe JOULE project EWTC

    Energy Technology Data Exchange (ETDEWEB)

    Nath, C [Germanischer Lloyd, Hamburg (Germany); Eriksson, C [Det Norske Veritas, Hellerup (Denmark); Hulle, F van [Frans van Hulle, Petten (Netherlands); Skamris, C [Risoe National Lab., Roskilde (Denmark); Stam, W [CIWI Holland, Arnheim (Netherlands); Vionis, P [CRES, Attki (Greece)

    1999-03-01

    Wind turbine certification requirements are currently fairly divers within Europe. Therefore the leading European certification bodies initiated a JOULE project to harmonise the certification procedure on the basis of the current set of IEC/EN 61400 series standards. The paper presents a review of the state of the art of wind turbine certification in European countries and an outline of the sturcture of the project. The main steps of the project are (a) the collection of differences in certification practices by round robin certification of three wind turbine types; (b) assessment of the different certification results and (c) the development of a harmonised certification procedure. (au) EU-JOULE-3. 19 refs.

  7. Financial analysis of wind power projects

    International Nuclear Information System (INIS)

    Juanico, Luis E.; Bergallo, Juan E.

    1999-01-01

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO 2 emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries

  8. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  9. Pilot project Uljabuouda. Final report; Pilotprojekt Uljabuouda. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    During the period of 2007-2010 Skellefteaa Kraft AB erected a wind farm comprising 10 3 MW wind turbines on the mountain Uljabuouda in the municipality of Arjeplog. The turbines are of the type WWD-3 with a hub height of 80 meters and a rotor diameter of 90 meters. The Uljabuouda wind farm is one of the first erected above the treeline in the Swedish mountains. The wind turbines are adapted to cold climate equipped with an ice prevention system for the blades. The process of obtaining the necessary permits for the erection of the wind farm was lengthy and lasted during the period of 2000 to 2008. Also the procurement process took longer than expected. During the period of 2006-2008 when the procurement was performed it was difficult to find a supplier who could offer wind turbines equipped with a deicing system. In December 2006 the Uljabuouda project was granted a subsidy from the Swedish Energy Agency, the maximum of 35 million Swedish crowns. The final investment costs of the project will be higher than previously estimated. The main reason for this was the prevailing market conditions during the procurement period. The Uljabuouda wind farm is in full operation since the winter of 2010/2011 and so far our experiences are that the ice prevention system is working well even at harsh icing conditions

  10. Next step in policy transitions: Diffusion of pilot projects

    CSIR Research Space (South Africa)

    Vreugdenhil, H

    2009-04-01

    Full Text Available communication across actors and domains, to set the agenda and to streamline resources (Pahl-Wostl, 2006, Pawson and Tilley, 1997). Social and policy learning are realized within the pilot projects. Social learning as one outcome of pilot project.... These ask for new approaches that are first to be tested on a small scale to prevent larger policy flaws and second, are designed to allow the system for remaining adaptable (Pahl-Wostl, 2006; Pawson and Tilley, 1997). Despite these promising...

  11. Implementation Strategy for a Global Solar and Wind Atlas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-01-15

    In July 2009, Major Economies Forum leaders met to prepare for the COP 15 Copenhagen Conference that took place later that year. At this occasion the Major Economies Forum Global Partnership f or low carbon and climate-friendly technology was founded and Technology Action Plans (TAPs) for ten key low-carbon technologies were drafted. At that juncture Denmark, Germany and Spain took on the responsibility for drafting TAPs for Solar and Wind Energy Technologies. The TAPs were then consolidated and presented at COP 15 that would later take place in December in Copenhagen. Since then, countries that led the development of the Action Plans have started their implementation. During a first Clean Energy Ministerial (CEM) in July 2010 in Washington on the invitation of Steven Chu, US Secretary of Energy, several initiatives were launched. Denmark, Germany and Spain took the lead in the implementation of the TAPs for Solar and Wind Technologies and initiated the Multilateral Working Group on Solar and Wind Energy Technologies (MWGSW). Several countries joined the working group in Washington and afterwards. In two international workshops in Bonn (June 2010) and Madrid (November 2010) and in meetings during the first CEM in Washington (July 2010) and the second CEM in Abu Dhabi (April 2011) the Multilateral Working Group made substantial progress in the two initial fields of action: (1) the Development of a Global Solar and Wind Atlas; and (2) the Development of a Long-term Strategy on Joint Capacity Building. Discussion papers on the respective topics were elaborated involving the Working Group's member countries as well as various international institutions. This led to concrete proposals for several pilot activities in both fields of action. After further specifying key elements of the suggested projects in two expert workshops in spring 2011, the Multilateral Working Group convened for a third international workshop in Copenhagen, Denmark, to discuss the project

  12. The ATLAS Level-2 Trigger Pilot Project

    CERN Document Server

    Wickens, F J

    2000-01-01

    The Level-2 Trigger Pilot Project of ATLAS, one of the two general purpose LHC experiments, is part of the on-going programme to develop the ATLAS High Level Triggers (HLT). The Level-2 Trigger will receive events at up to 100 kHz, which has to be reduced to a rate suitable for full event-building of the order of 1 kHz. To reduce the data collection bandwidth and processing power required for the challenging Level-2 task it is planned to use Region of Interest guidance (from Level-1) and sequential processing. The Pilot Project included the construction and use of testbeds of up to 48 processing nodes, development of optimised components and computer simulations of a full system. It has shown how the required performance can be achieved, using largely commodity components and operating systems, and validated an architecture for the Level-2 system. This paper describes the principal achievements and conclusions of this project. (28 refs).

  13. The ATLAS Level-2 Trigger Pilot Project

    CERN Document Server

    Blair, R; Haberichter, W N; Schlereth, J L; Bock, R; Bogaerts, A; Boosten, M; Dobinson, Robert W; Dobson, M; Ellis, Nick; Elsing, M; Giacomini, F; Knezo, E; Martin, B; Shears, T G; Tapprogge, Stefan; Werner, P; Hansen, J R; Wäänänen, A; Korcyl, K; Lokier, J; George, S; Green, B; Strong, J; Clarke, P; Cranfield, R; Crone, G J; Sherwood, P; Wheeler, S; Hughes-Jones, R E; Kolya, S; Mercer, D; Hinkelbein, C; Kornmesser, K; Kugel, A; Männer, R; Müller, M; Sessler, M; Simmler, H; Singpiel, H; Abolins, M; Ermoline, Y; González-Pineiro, B; Hauser, R; Pope, B; Sivoklokov, S Yu; Boterenbrood, H; Jansweijer, P; Kieft, G; Scholte, R; Slopsema, R; Vermeulen, J C; Baines, J T M; Belias, A; Botterill, David R; Middleton, R; Wickens, F J; Falciano, S; Bystrický, J; Calvet, D; Gachelin, O; Huet, M; Le Dû, P; Mandjavidze, I D; Levinson, L; González, S; Wiedenmann, W; Zobernig, H

    2002-01-01

    The Level-2 Trigger Pilot Project of ATLAS, one of the two general purpose LHC experiments, is part of the on-going program to develop the ATLAS high-level triggers (HLT). The Level-2 Trigger will receive events at up to 100 kHz, which has to be reduced to a rate suitable for full event-building of the order of 1 kHz. To reduce the data collection bandwidth and processing power required for the challenging Level-2 task it is planned to use Region of Interest guidance (from Level-1) and sequential processing. The Pilot Project included the construction and use of testbeds of up to 48 processing nodes, development of optimized components and computer simulations of a full system. It has shown how the required performance can be achieved, using largely commodity components and operating systems, and validated an architecture for the Level-2 system. This paper describes the principal achievements and conclusions of this project. (28 refs).

  14. Economic Development Impacts of Community Wind Projects: A Review and Empirical Evaluation; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Tegen, S.

    2009-04-01

    'Community wind' refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an 'absentee' project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  15. Pilot project of atomic energy technology record

    International Nuclear Information System (INIS)

    Song, K. C.; Kim, Y. I.; Kim, Y. G.

    2011-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records in each category as a whole summary from the background to the performance at all fields of nuclear science technology which researched and developed at KAERI. This project includes Data and Document Management System(DDMS) that will be the system to collect, organize and preserve various records occurred in each research and development process. To achieve these goals, many problems should be solved to establish technology records process, such as issues about investigation status of technology records in KAERI, understanding and collection records, set-up project system and selection target field, definition standards and range of target records. This is a research report on the arrangement of research contents and results about pilot project which records whole nuclear technology researched and developed at KAERI in each category. Section 2 summarizes the overview of this pilot project and the current status of technology records in domestic and overseas, and from Section 3 to Section 6 summarize contents and results which performed in this project. Section 3 summarizes making TOC(Table of Content) and technology records, Section 4 summarizes sectoral templates, Section 5 summarizes writing detailed plan of technology records, and Section 6 summarizes Standard Document Numbering System(SDNS). Conclusions of this report are described in Section 7

  16. Success Factors in Wind Power Projects

    International Nuclear Information System (INIS)

    Cabal, H.; Varela, M.; Lago, C.; Saez, R. M.

    2002-01-01

    The Spanish wind energy market has experienced an average annual increase over 60% in recent years. With more than 4.1 GW of power at the end of 2002, this market has became the second in Europe and the third in the world. With the objective of obtaining the origin of this success, an analysis of technical and economic features of selected wind projects has been undertaken to draw the outstanding factors that any new independent promoter/developer should take into account within this market. (Author) 16 refs

  17. Washington State Need Grant: Less-Than-Halftime Pilot Project (SHB 1345)

    Science.gov (United States)

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    The 2005 Washington State Legislature authorized, through Substitute House Bill 1345, a two-year pilot project allowing eligible students, who enroll for four or five credits in a term, to receive the State Need Grant (SNG). Several important policy considerations emerged during the pilot project. Board staff explored these issues with financial…

  18. Wind Power: Growing with the Demand of Sustainable Development

    Institute of Scientific and Technical Information of China (English)

    Wang Chengxu; Li Wei

    2009-01-01

    @@ History review Looking back upon the human history, China is among the earliest countries which make use of wind energy. It started to use the wind energy to pump water for irrigation very long time ago. Since the establishment of the new China, pilot projects of wind energy generation have been carried out in many areas. In 1975, Tsinghua University and the Inner Mongolia Prairie Research Institute cooperated to develop wind turbines. They developed prototypes of 50/100-W off-grid micro wind turbines. Meanwhile, small wind turbines were also developed in other areas. The wind turbines produced at that time were all in small capacity and did not play important role in power industry.

  19. The HADES demonstration and pilot project

    International Nuclear Information System (INIS)

    Bruyn, D.de; Meynendonckx, P.; Neerdael, B.; Noynaert, L.; Voet, M.; Volckaert, G.; Bonne, A.

    1988-01-01

    This report deals with the activities of SCK/CEN and its subcontractors performed during the years 1986-87 in the framework of the HADES demonstration and pilot project, which is carried out in the geological Boom clay formation underlying the nuclear research establishment at Mol. This demonstration and pilot project is sponsored by the Commission of the European Communities under contract number Fl1W-004 B (B) in the framework of Part B of the CEC programme on radioactive waste management and disposal. The actions undertaken and reported here deal essentially with design and engineering activities in preparation for the construction of a test drift and of a mine-by-test directly related to this construction test and of a combined irradiation/heating test to be performed later on in this test drift. A time schedule for the various tests planned to be made in the test drift has also been worked out taking into account time and spatial dependencies

  20. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  1. Decommissioning wind energy projects: An economic and political analysis

    International Nuclear Information System (INIS)

    Ferrell, Shannon L.; DeVuyst, Eric A.

    2013-01-01

    Wind energy is the fastest-growing segment of new electrical power capacity in the United States, with the potential for significant growth in the future. To facilitate such growth, a number of concerns between developers and landowners must be resolved, including assurance of wind turbine decommissioning at the end of their useful lives. Oklahoma legislators enlisted the authors to develop an economically-sound proposal to ensure developers complete their decommissioning obligations. Economic analysis of turbine decommissioning is complicated by a lack of operational experience, as few U.S. projects have been decommissioned. This leads to a lack of data regarding decommissioning costs. Politically, the negotiation leading to the finally-enacted solution juxtaposed economic theory against political pragmatism, leading to a different but hopefully sound solution. This article will provide background for the decommissioning issue, chronicle the development of the decommissioning component of the Oklahoma Wind Energy Act, and frame issues that remain for policymakers in regulating wind power development. - Highlights: ► Wind energy is the fastest-growing component of U.S. power generation. ► Decommissioning wind projects is policy concern for wind development. ► Little public information on wind turbine decommissioning costs exists. ► Oklahoma’s solution attempts to account for both costs and risks. ► Additional research is needed to create a more precise policy solution.

  2. The Distributed Wind Cost Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, Trudy; Jimenez, Tony; Preus, Robert; Tegen, Suzanne; Baring-Gould, Ian

    2017-03-28

    To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbine costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.

  3. Optimal Locations for Siting Wind Energy Projects: Technical Challenges, Economics, and Public Preferences

    Science.gov (United States)

    Lamy, Julian V.

    Increasing the percentage of wind power in the United States electricity generation mix would facilitate the transition towards a more sustainable, low-pollution, and environmentally-conscious electricity grid. However, this effort is not without cost. Wind power generation is time-variable and typically not synchronized with electricity demand (i.e., load). In addition, the highest-output wind resources are often located in remote locations, necessitating transmission investment between generation sites and load. Furthermore, negative public perceptions of wind projects could prevent widespread wind development, especially for projects close to densely-populated communities. The work presented in my dissertation seeks to understand where it's best to locate wind energy projects while considering these various factors. First, in Chapter 2, I examine whether energy storage technologies, such as grid-scale batteries, could help reduce the transmission upgrade costs incurred when siting wind projects in distant locations. For a case study of a hypothetical 200 MW wind project in North Dakota that delivers power to Illinois, I present an optimization model that estimates the optimal size of transmission and energy storage capacity that yields the lowest average cost of generation and transmission (/MWh). I find that for this application of storage to be economical, energy storage costs would have to be 100/kWh or lower, which is well below current costs for available technologies. I conclude that there are likely better ways to use energy storage than for accessing distant wind projects. Following from this work, in Chapter 3, I present an optimization model to estimate the economics of accessing high quality wind resources in remote areas to comply with renewable energy policy targets. I include temporal aspects of wind power (variability costs and correlation to market prices) as well as total wind power produced from different farms. I assess the goal of providing

  4. Lidars for Wind Tunnels - an IRPWind Joint Experiment Project

    DEFF Research Database (Denmark)

    Sjöholm, Mikael; Vignaroli, Andrea; Angelou, Nikolas

    2017-01-01

    Measurement campaigns with continuous-wave Doppler Lidars (Light detection and ranging) developed at DTU Wind Energy in Denmark were performed in two very different wind tunnels. Firstly, a measurement campaign in a small icing wind tunnel chamber at VTT in Finland was performed with high frequency...... used in blind test comparisons for wind turbine wake modelers. These Lidar measurement activities constitute the Joint Experiment Project” L4WT - Lidars for Wind Tunnels, with applications to wakes and atmospheric icing in a prospective Nordic Network” with the aim of gaining and sharing knowledge...... about possibilities and limitations with lidar instrumentation in wind tunnels, which was funded by the IRPWind project within the community of the European Energy Research Alliance (EERA) Joint Programme on Wind Energy....

  5. The Impact of Variable Wind Shear Coefficients on Risk Reduction of Wind Energy Projects.

    Science.gov (United States)

    Corscadden, Kenneth W; Thomson, Allan; Yoonesi, Behrang; McNutt, Josiah

    2016-01-01

    Estimation of wind speed at proposed hub heights is typically achieved using a wind shear exponent or wind shear coefficient (WSC), variation in wind speed as a function of height. The WSC is subject to temporal variation at low and high frequencies, ranging from diurnal and seasonal variations to disturbance caused by weather patterns; however, in many cases, it is assumed that the WSC remains constant. This assumption creates significant error in resource assessment, increasing uncertainty in projects and potentially significantly impacting the ability to control gird connected wind generators. This paper contributes to the body of knowledge relating to the evaluation and assessment of wind speed, with particular emphasis on the development of techniques to improve the accuracy of estimated wind speed above measurement height. It presents an evaluation of the use of a variable wind shear coefficient methodology based on a distribution of wind shear coefficients which have been implemented in real time. The results indicate that a VWSC provides a more accurate estimate of wind at hub height, ranging from 41% to 4% reduction in root mean squared error (RMSE) between predicted and actual wind speeds when using a variable wind shear coefficient at heights ranging from 33% to 100% above the highest actual wind measurement.

  6. Great Plains Wind Energy Transmission Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task

  7. Vertical wind velocity measurements using a five-hole probe with remotely piloted aircraft to study aerosol–cloud interactions

    Directory of Open Access Journals (Sweden)

    R. Calmer

    2018-05-01

    Full Text Available The importance of vertical wind velocities (in particular positive vertical wind velocities or updrafts in atmospheric science has motivated the need to deploy multi-hole probes developed for manned aircraft in small remotely piloted aircraft (RPA. In atmospheric research, lightweight RPAs ( <  2.5 kg are now able to accurately measure atmospheric wind vectors, even in a cloud, which provides essential observing tools for understanding aerosol–cloud interactions. The European project BACCHUS (impact of Biogenic versus Anthropogenic emissions on Clouds and Climate: towards a Holistic UnderStanding focuses on these specific interactions. In particular, vertical wind velocity at cloud base is a key parameter for studying aerosol–cloud interactions. To measure the three components of wind, a RPA is equipped with a five-hole probe, pressure sensors, and an inertial navigation system (INS. The five-hole probe is calibrated on a multi-axis platform, and the probe–INS system is validated in a wind tunnel. Once mounted on a RPA, power spectral density (PSD functions and turbulent kinetic energy (TKE derived from the five-hole probe are compared with sonic anemometers on a meteorological mast. During a BACCHUS field campaign at Mace Head Atmospheric Research Station (Ireland, a fleet of RPAs was deployed to profile the atmosphere and complement ground-based and satellite observations of physical and chemical properties of aerosols, clouds, and meteorological state parameters. The five-hole probe was flown on straight-and-level legs to measure vertical wind velocities within clouds. The vertical velocity measurements from the RPA are validated with vertical velocities derived from a ground-based cloud radar by showing that both measurements yield model-simulated cloud droplet number concentrations within 10 %. The updraft velocity distributions illustrate distinct relationships between vertical cloud fields in different meteorological

  8. Participatory forest management in Ethiopia: learning from pilot projects.

    Science.gov (United States)

    Ameha, Aklilu; Larsen, H O; Lemenih, Mulugeta

    2014-04-01

    Different arrangements of decentralized forest management have been promoted as alternatives to centralized and top down approaches to halt tropical deforestation and forest degradation. Ethiopia is one of the countries piloting one of these approaches. To inform future programs and projects it is essential to learn from existing pilots and experiences. This paper analyses five of the pilot participatory forest management (PFM) programs undertaken in Ethiopia. The study is based on the Forest User Group (FUG) members' analyses of the programs using selected outcome variables: forest income, change in forest conditions, forest ownership feelings and effectiveness of FUGs as forest managing institutions. These variables were assessed at three points in time-before the introduction of PFM, during the project implementation and after the projects ended. Data were collected using group discussions, key informant interviews and transect walks through the PFM forests. The results show that in all of the five cases the state of the forest is perceived to have improved with the introduction of PFM, and in four of the cases the improvement was maintained after projects ended. Regulated access to the forests following introduction of PFM was not perceived to have affected forest income negatively. There are, however, serious concerns about the institutional effectiveness of the FUGs after projects ended, and this may affect the success of the PFM approach in the longer term.

  9. Developing an Indicator System for Measuring the Social Sustainability of Offshore Wind Power Farms

    Directory of Open Access Journals (Sweden)

    Tzay-An Shiau

    2016-05-01

    Full Text Available Taiwan’s government has promoted investment in an offshore wind power farm, and local fishermen have protested. A social impact assessment (SIA has examined the impact of the proposed offshore wind power farm on all stakeholders. The main objective of the present study was to develop an indicator system for measuring the social sustainability of offshore wind power farms; this study also reports on the particular case of Taiwan’s offshore wind power project. This study began by defining 35 social sustainability indicators and selecting 23 representative indicators by using rough set theory. Subsequently, 14 key indicators were constructed using the social construction of technology (SCOT method. Finally, we developed a social impact index for evaluating the social sustainability of offshore wind power farms by using the analytic network process and Dempster-Shafer theory. Our social impact index yields a total score of 0.149 for Taiwan’s pilot offshore wind power project; this result indicates that the pilot project is socially sustainable. A substantial contradiction exists between the fishermen’s protest and the results of the social impact assessment. The findings can assist the government in building a coordination platform for the investors and the fishermen. Government regulation is necessary to set boundaries for fishing areas that protect both the fishermen’s and investors’ rights.

  10. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  11. Wind Plant Performance Prediction (WP3) Project

    Energy Technology Data Exchange (ETDEWEB)

    Craig, Anna [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-26

    The methods for analysis of operational wind plant data are highly variable across the wind industry, leading to high uncertainties in the validation and bias-correction of preconstruction energy estimation methods. Lack of credibility in the preconstruction energy estimates leads to significant impacts on project financing and therefore the final levelized cost of energy for the plant. In this work, the variation in the evaluation of a wind plant's operational energy production as a result of variations in the processing methods applied to the operational data is examined. Preliminary results indicate that selection of the filters applied to the data and the filter parameters can have significant impacts in the final computed assessment metrics.

  12. U.S. Department of Energy Wind Turbine Development Projects

    International Nuclear Information System (INIS)

    Migliore, P.G.; Calvert, S.D.

    1999-01-01

    This paper provides an overview of wind-turbine development activities in the Unites States and relates those activities to market conditions and projections. Several factors are responsible for a surge in wind energy development in the United States, including a federal production tax credit, ''green power'' marketing, and improving cost and reliability. More development is likely, as approximately 363 GW of new capacity will be needed by 2020 to meet growing demand and replace retiring units. The U.S. Department of Energy (DOE) is helping two companies develop next-generation turbines intended to generate electricity for $0.025/kWh or less. We expect to achieve this objective through a combination of improved engineering methods and configuration advancements. This should ensure that wind power will compete effectively against advanced combined-cycle plants having projected generating costs of $0.031/kWh in 2005. To address the market for small and intermediate-size wind turbines, DOE is assisting five companies in their attempts to develop new turbines having low capital cost and high reliability. Additional information regarding U.S. wind energy programs is available on the internet site www.nrel.gov/wind/. E-mail addresses for the turbine manufacturers are found in the Acknowledgements

  13. Decision making and risk analysis during the development of wind energy projects

    International Nuclear Information System (INIS)

    Vanhaesebroeck, M.

    2004-11-01

    This study aims at determining a methodology or criteria which can be used as decision making tools for the development of wind power projects and for the objective profitability comparison between several projects. In the first part, the different steps of the development of a wind power project in France are described. For each step, the cost of the studies, the related approaches and the main risks of abandonment are precised. The potential time drifts in the planning of the project are identified on the basis of the experience feedback of the first years of wind power development in France. In the second part, the possibilities of using classical investment choice techniques are analyzed. The characteristics having more impact on the project profitability are identified. In the third part, the sequential models with increasing information are used to evaluate a project, whatever its level of development. Finally, a concrete case is considered to see how these models can be used as decision making tools during key steps of wind farms development. (J.S.)

  14. Study on optimized decision-making model of offshore wind power projects investment

    Science.gov (United States)

    Zhao, Tian; Yang, Shangdong; Gao, Guowei; Ma, Li

    2018-02-01

    China’s offshore wind energy is of great potential and plays an important role in promoting China’s energy structure adjustment. However, the current development of offshore wind power in China is inadequate, and is much less developed than that of onshore wind power. On the basis of considering all kinds of risks faced by offshore wind power development, an optimized model of offshore wind power investment decision is established in this paper by proposing the risk-benefit assessment method. To prove the practicability of this method in improving the selection of wind power projects, python programming is used to simulate the investment analysis of a large number of projects. Therefore, the paper is dedicated to provide decision-making support for the sound development of offshore wind power industry.

  15. Project appraisal for small and medium size wind energy installation: The Italian wind energy policy effects

    International Nuclear Information System (INIS)

    Fera, M.; Iannone, R.; Macchiaroli, R.; Miranda, S.; Schiraldi, M.M.

    2014-01-01

    In the last few years, the distributed energy production from small wind turbines (i.e.<200 kWp) has developed into a relevant business opportunity for different investors in Italy. The market, especially in Italy, has rapidly grown, achieving 9 MWp only in 2011, with an increase from 1.5 MW in 2009 to 13.3 MW at the end of 2011. This paper reports the results of a case study on the installation of several small wind turbines. It aims to provide an analysis of the conditions in Italy that make it possible to install these machines and offer a reliable reference for designing, planning, and controlling small wind turbine projects while focusing on the strategic variables of time, cost, and quality used by typical enterprises in the investment projects. The results are relevant to investors as well as engineering, procurement, and construction companies involved in this new sector, which must understand Italy’s renewable energy policy and its effects in practice. Moreover, certain national energy policy conclusions are reported and discussed in this paper. To properly study the sector, the data on time, cost and quality are analysed using typical project management tools. - Highlights: • Focus on the Italian wind energy sector. • Analysis of Italian policy effects. • Focus on small/medium size wind energy machines

  16. Swiss electricity grid - Benchmarking pilot project

    International Nuclear Information System (INIS)

    2001-01-01

    This article is a short version of the ENET number 210369. This report for the Swiss Federal Office of Energy (SFOE) describes a benchmarking pilot project carried out as a second phase in the development of a formula for the regulation of an open electricity market in Switzerland. It follows on from an initial phase involving the definition of a 'blue print' and a basic concept. The aims of the pilot project - to check out the practicability of the concept - are discussed. The collection of anonymised data for the benchmarking model from over 30 electricity utilities operating on all 7 Swiss grid levels and their integration in the three areas 'Technology', 'Grid Costs' and 'Capital Invested' are discussed in detail. In particular, confidentiality and data protection aspects are looked at. The methods used in the analysis of the data are described and the results of an efficiency analysis of various utilities are presented. The report is concluded with a listing of questions concerning data collection and analysis as well as operational and capital costs that are still to be answered

  17. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  18. Wind energy and spatial planning procedures; La programmation spatiale des projects eoliens

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Wind turbines projects have been increasing, but some are very conflicted. May be it is a reason why some local authorities have to deal with different point of view, above the only energy question and including local specificity. To give local authorities the possibility to be implicated and to be in control of wind projects in their territory, wind spatial planning should permit to choose suitable areas and to optimize wind power development. In this context this synthesis presents the wind spatial planning in Finistere (France), the french regulation, some international experiences (Danish, Flemish, Walloon region, Dutch) and the different approaches of spatial planning. (A.L.B.)

  19. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  20. A nonlinear dynamics approach for incorporating wind-speed patterns into wind-power project evaluation.

    Science.gov (United States)

    Huffaker, Ray; Bittelli, Marco

    2015-01-01

    Wind-energy production may be expanded beyond regions with high-average wind speeds (such as the Midwest U.S.A.) to sites with lower-average speeds (such as the Southeast U.S.A.) by locating favorable regional matches between natural wind-speed and energy-demand patterns. A critical component of wind-power evaluation is to incorporate wind-speed dynamics reflecting documented diurnal and seasonal behavioral patterns. Conventional probabilistic approaches remove patterns from wind-speed data. These patterns must be restored synthetically before they can be matched with energy-demand patterns. How to accurately restore wind-speed patterns is a vexing problem spurring an expanding line of papers. We propose a paradigm shift in wind power evaluation that employs signal-detection and nonlinear-dynamics techniques to empirically diagnose whether synthetic pattern restoration can be avoided altogether. If the complex behavior of observed wind-speed records is due to nonlinear, low-dimensional, and deterministic system dynamics, then nonlinear dynamics techniques can reconstruct wind-speed dynamics from observed wind-speed data without recourse to conventional probabilistic approaches. In the first study of its kind, we test a nonlinear dynamics approach in an application to Sugarland Wind-the first utility-scale wind project proposed in Florida, USA. We find empirical evidence of a low-dimensional and nonlinear wind-speed attractor characterized by strong temporal patterns that match up well with regular daily and seasonal electricity demand patterns.

  1. Potential of wind power projects under the Clean Development Mechanism in India

    Directory of Open Access Journals (Sweden)

    Michaelowa Axel

    2007-07-01

    Full Text Available Abstract Background So far, the cumulative installed capacity of wind power projects in India is far below their gross potential (≤ 15% despite very high level of policy support, tax benefits, long term financing schemes etc., for more than 10 years etc. One of the major barriers is the high costs of investments in these systems. The Clean Development Mechanism (CDM of the Kyoto Protocol provides industrialized countries with an incentive to invest in emission reduction projects in developing countries to achieve a reduction in CO2 emissions at lowest cost that also promotes sustainable development in the host country. Wind power projects could be of interest under the CDM because they directly displace greenhouse gas emissions while contributing to sustainable rural development, if developed correctly. Results Our estimates indicate that there is a vast theoretical potential of CO2 mitigation by the use of wind energy in India. The annual potential Certified Emissions Reductions (CERs of wind power projects in India could theoretically reach 86 million. Under more realistic assumptions about diffusion of wind power projects based on past experiences with the government-run programmes, annual CER volumes by 2012 could reach 41 to 67 million and 78 to 83 million by 2020. Conclusion The projections based on the past diffusion trend indicate that in India, even with highly favorable assumptions, the dissemination of wind power projects is not likely to reach its maximum estimated potential in another 15 years. CDM could help to achieve the maximum utilization potential more rapidly as compared to the current diffusion trend if supportive policies are introduced.

  2. Financing wind power projects : perspectives from the US market

    International Nuclear Information System (INIS)

    Alam, M.

    2005-01-01

    This presentation outlined the recent assignments, core competencies and scope of services provided by Alyra Renewable Energy Finance Advisors. Renewable energy developers seek Alyra's assistance in developing strategies to achieve the most competitive solutions in finance and strategy. Alyra has broad finance expertise in renewable energy projects, a deep knowledge of markets and a significant wind industry network. Alyra identifies emerging issues, completes financing solutions and helps with contract negotiations. This presentation outlined the notable features of wind financing, wind assessment, offtake arrangements, equity considerations, US wind debt markets, long term bank financing, and combined bank and private placement financing. It also included recent debt market activity for seven large wind farms in the United States. tabs., figs

  3. Final Technical Report, Wind Generator Project (Ann Arbor)

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, Nathan [City of Ann Arbor, MI (United States)

    2017-03-20

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  4. Advanced engineering environment pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty (Parametric Technology Corporation, Needham, MA)

    2006-10-01

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

  5. Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-06-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

  6. The power of community : the role of ownership in social marketing of wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Roscoe, D. [Scotian Windfields, Dartmouth, NS (Canada)

    2008-07-01

    This paper discussed the benefits of community ownership for wind power projects in Nova Scotia. The community economic development investment fund (CEDIF) is a pool of capital funds formed by selling shares to people within a defined community. CEDIFs are created to operate or invest in local business as part of a government initiative to provide incentives for local business development. Those eligible for CEDIFs include incorporated organizations with a minimum of 25 investors, and when 6 of the maximum 12 directors are from the local community. No investors may own more than 20 per cent. CEDIF incentives include pre-approved holdings for registered savings plans; a 30 per cent non-refundable equity tax credit against Nova Scotia taxes, and additional credits for maintaining investment. Local WindFields investors have invested in the Scotian WindFields in order to develop renewable energy projects. Community ownership of wind power projects can result in greater acceptance of wind power as well as increased economic prosperity and employment. Community ownership can also lead to improved land lease opportunities and relationships between contractors, local businesses, and federal and provincial governments. Details of wind power projects in Nova Scotia were provided. It was concluded that wind power developers should consider community ownership of wind projects. tabs., figs.

  7. Pilot Projects in Water Management : Practicing Change and Changing Practice

    NARCIS (Netherlands)

    Vreugdenhil, H.S.I.

    2010-01-01

    Pilot projects are widely applied in water management. They can be used to test risky innovations at confined scale, but can also be used to delay policy decisions or to advocate a particular innovation. In this book the phenomenon ‘pilot project’ is explored both theoretically and empirically. A

  8. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  9. 78 FR 35961 - Pilot Project for Tribal Jurisdiction Over Crimes of Domestic Violence

    Science.gov (United States)

    2013-06-14

    ...This notice proposes procedures for an Indian tribe to request designation as a participating tribe under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, pursuant to the voluntary pilot project described in section 908(b)(2) of the Violence Against Women Reauthorization Act of 2013 (``the Pilot Project''), and also proposes procedures for the Attorney General to act on such a request. This notice also invites public comment on the proposed procedures and solicits preliminary expressions of interest from tribes that may wish to participate in the Pilot Project.

  10. Changes in Surface Wind Speed over North America from CMIP5 Model Projections and Implications for Wind Energy

    Directory of Open Access Journals (Sweden)

    Sujay Kulkarni

    2014-01-01

    Full Text Available The centennial trends in the surface wind speed over North America are deduced from global climate model simulations in the Climate Model Intercomparison Project—Phase 5 (CMIP5 archive. Using the 21st century simulations under the RCP 8.5 scenario of greenhouse gas emissions, 5–10 percent increases per century in the 10 m wind speed are found over Central and East-Central United States, the Californian Coast, and the South and East Coasts of the USA in winter. In summer, climate models projected decreases in the wind speed ranging from 5 to 10 percent per century over the same coastal regions. These projected changes in the surface wind speed are moderate and imply that the current estimate of wind power potential for North America based on present-day climatology will not be significantly changed by the greenhouse gas forcing in the coming decades.

  11. 77 FR 12312 - Electronic Submission of Nonclinical Study Data; Notice of Pilot Project

    Science.gov (United States)

    2012-02-29

    ...] Electronic Submission of Nonclinical Study Data; Notice of Pilot Project AGENCY: Food and Drug Administration... and Research (CBER) is announcing an invitation to participate in a pilot evaluation program to test.... Participation in the pilot program is open to all sponsors. The pilot program is intended to provide industry...

  12. Environmental data for the planning of off-shore wind parks from the EnerGEO Platform of Integrated Assessment (PIA)

    Energy Technology Data Exchange (ETDEWEB)

    Zelle, Hein; Mika, Agnes; Calkoen, Charles; Santbergen, Peter [BMT ARGOSS, Marknesse (Netherlands); Blanc, Isabelle; Guermont, Catherine; Menard, Lionel; Gschwind, Benoit [MINES ParisTech, Sophia Antipolis (France)

    2013-07-01

    The EU-sponsored EnerGEO project aims at providing decision makers with a modelling platform to assess the environmental impacts of different sources of renewable energy. One of the pillars of the project is the Wind Energy Pilot, addressing the effects of offshore wind parks on air pollution and energy use. The methods used in the pilot and the underlying environmental databases are integrated into a WebGIS client tool and made available to the public. This paper is dedicated to describing the environmental databases and supporting data incorporated in the client tool. A 27-km resolution, 11-year wind database is created using the WRF model. The wind database is used to assess the wind climate in the north-west Atlantic region and to derive the potential power output from offshore wind parks. Auxiliary data concerning water depth, distance to shore and distance to the nearest suitable port are created to aid the planning and maintenance phases. Seasonal workability conditions are assessed using a 20-year wave database. The distance at which future wind parks should be placed to exhibit different wind climates is investigated. (orig.)

  13. Environmental data for the planning of off-shore wind parks from the EnerGEO Platform of Integrated Assessment (PIA)

    International Nuclear Information System (INIS)

    Zelle, Hein; Mika, Agnes; Calkoen, Charles; Santbergen, Peter; Blanc, Isabelle; Guermont, Catherine; Menard, Lionel; Gschwind, Benoit

    2013-01-01

    The EU-sponsored EnerGEO project aims at providing decision makers with a modelling platform to assess the environmental impacts of different sources of renewable energy. One of the pillars of the project is the Wind Energy Pilot, addressing the effects of offshore wind parks on air pollution and energy use. The methods used in the pilot and the underlying environmental databases are integrated into a WebGIS client tool and made available to the public. This paper is dedicated to describing the environmental databases and supporting data incorporated in the client tool. A 27-km resolution, 11-year wind database is created using the WRF model. The wind database is used to assess the wind climate in the north-west Atlantic region and to derive the potential power output from offshore wind parks. Auxiliary data concerning water depth, distance to shore and distance to the nearest suitable port are created to aid the planning and maintenance phases. Seasonal workability conditions are assessed using a 20-year wave database. The distance at which future wind parks should be placed to exhibit different wind climates is investigated. (orig.)

  14. Mesoscale modeling for the Wind Atlas of South Africa (WASA) project

    DEFF Research Database (Denmark)

    Hahmann, Andrea N.; Lennard, Chris; Badger, Jake

    This document reports on the methods used to create and the results of the two numerical wind atlases developed for the Wind Atlas for South Africa (WASA) project. The wind atlases were created using the KAMM-WAsP method and from the output of climate-type simulations of the Weather, Research...

  15. Power control for wind turbines in weak grids: Project summary

    DEFF Research Database (Denmark)

    Bindner, H.

    1999-01-01

    . The two case studies (Madeira, Portugal and Co. Donegal, Ireland) revealed that sometimes theleast cost and most attractive option is change in the operating strategy of the power system. This allowed that further wind energy can be integrated at competitive cost in the Madeira power system. In Co....... Donegal the options for pumped storage are goodcombined with good wind resources. Unfortunately the grid is weak. The least cost option for the feeder studied is either grid reinforcement or a power control system based on pumped storage if rather large amounts of wind energy are to be absorbed...... by thepower system. The cost estimates for the two options are in the same range. The current report is a summary of the work done in the project 'Power Control for Wind Turbines in Weak Grids'. The project has been partly funded by EU under contractJOR3-CT95-0067....

  16. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  17. Technology Performance Report: Duke Energy Notrees Wind Storage Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Wehner, Jeff [Duke Energy Renewables, Charlotte, NC (United States); Mohler, David [Duke Energy Renewables, Charlotte, NC (United States); Gibson, Stuart [Duke Energy Renewables, Charlotte, NC (United States); Clanin, Jason [Duke Energy Renewables, Charlotte, NC (United States); Faris, Don [Duke Energy Renewables, Charlotte, NC (United States); Hooker, Kevin [Duke Energy Renewables, Charlotte, NC (United States); Rowand, Michael [Duke Energy Renewables, Charlotte, NC (United States)

    2015-11-01

    Duke Energy Renewables owns and operates the Notrees Wind Farm in west Texas’s Ector and Winkler counties. The wind farm, which was commissioned in April 2009, has a total capacity of 152.6 MW generated by 55 Vestas V82 turbines, one Vestas 1-V90 experimental turbine, and 40 GE 1.5-MW turbines. The Vestas V82 turbines have a generating capacity of 1.65 MW each, the Vestas V90 turbine has a generating capacity of 1.86 MW, and the GE turbines have a generating capacity of 1.5 MW each. The objective of the Notrees Wind Storage Demonstration Project is to validate that energy storage increases the value and practical application of intermittent wind generation and is commercially viable at utility scale. The project incorporates both new and existing technologies and techniques to evaluate the performance and potential of wind energy storage. In addition, it could serve as a model for others to adopt and replicate. Wind power resources are expected to play a significant part in reducing greenhouse gas emissions from electric power generation by 2030. However, the large variability and intermittent nature of wind presents a barrier to integrating it within electric markets, particularly when competing against conventional generation that is more reliable. In addition, wind power production often peaks at night or other times when demand and electricity prices are lowest. Energy storage systems can overcome those barriers and enable wind to become a valuable asset and equal competitor to conventional fossil fuel generation.

  18. Simplified pilot module development and testing within the ATLAS PanDA Pilot 2.0 Project

    CERN Document Server

    Drizhuk, Daniil; The ATLAS collaboration; Nilsson, Paul

    2016-01-01

    The Production and Distributed Analysis (PanDA) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at the LHC data processing scale. The PanDA pilot is one of the major components in the PanDA system. It runs on a worker node and takes care of setting up the environment, fetching and pushing data to storage, getting jobs from the PanDA server and executing them. The original PanDA Pilot was designed over 10 years ago and has since then grown organically. Large parts of the original pilot code base are now getting old and are difficult to maintain. Incremental changes and refactoring have been pushed to the limit, and the time is now right for a fresh start, informed by a decade of experience, with the PanDA Pilot 2.0 Project. To create a testing environment for module development and automated unit and functional testing for next generation pilot tasks, a simple pilot version was developed. It resembles the basic workf...

  19. Havsnaes Wind Farm. A guide on Health and Safety

    Energy Technology Data Exchange (ETDEWEB)

    Wettin, Martina [Goovinn, Goeteborg (Sweden); Jiven, Anna [Nordisk Vindkraft, Goeteborg (Sweden)

    2011-07-01

    This guide has been developed by Nordisk Vindkraft in co-operation with Energimyndigheten (the Swedish Energy Agency). The main purpose is to raise the attention to work environment matters when developing, constructing and operating large-scale wind farms in the northern parts of Sweden. The Swedish wind industry is relatively young. Work Environment Management and legal awareness has been identified by the Swedish Government as one crucial factor for ensuring sound and rapid development of the industry. Havsnaes is to date the largest onshore wind farm in Sweden. Whilst developing this project, Nordisk Vindkraft has gained extensive experience and developed a profound understanding of the prerequisites for the Swedish large-scale wind industry. The wind farm's size, complexity and geographical location near Stroemsund in Jaemtland qualify the project as an excellent pilot study. Preventing accidents and ill-health largely depends on your knowledge, competence and the resources you are able and willing to spend. The key for success is a pro-active approach. During the Havsnaes project, Nordisk Vindkraft has spent considerable amount of time and effort on the management of Work Environment. We hope our gained experience will be beneficial for our industry as a whole.

  20. Conference on wind power development in the face of landscape and local project acceptability challenges

    International Nuclear Information System (INIS)

    Victoire Lejzerzon; Sauron, Claire; Villot, Marie; Ratzbor, Guenter; Tausch, Christian; Cagneaux, Bertrand; Jouneau, Agathe; Stemmer, Boris; Huebner, Gundula; Orozco-Souel, Paola; Lhermitte, Charles; Ferus, Elisabeth; Benezech, Philippe; Gunzelmann, Thomas

    2015-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on n wind power development in the face of landscape and local project acceptability challenges. In the framework of this French-German exchange of experience, participants addressed the following points: the conciliation between landscape protection and wind power development, the definition of landscape environmental quality criteria, the needs and usages of the departments in charge of the treatment of landscape studies in France, the socio-psychological approach of the local acceptability of wind farm projects, the re-powering tool for the improvement of the wind farm integration in the landscape, and the conciliation between the monuments maintenance and wind power development. This document brings together the available presentations (slides) made during this event: 1 - Conciliating landscape protection and wind power development goals in France (Marie Villot); 2 - Wind turbines: Conflicts between development goals, landscape and acceptance - Perception and criteria (Guenter Ratzbor); 3 - Bayern's wind power atlas: a planning tool which takes into account the landscape aspects (Christian Tausch); 4 - Landscape assessment in wind farms projects: what and how to do in French administrative procedures? (Bertrand Cagneaux); 5 - Methods for evaluation of landscape for wind farms projects - A French project developer's feedback (Agathe Jouneau); 6 - Landscape Assessment: Methods from German Landscape Practice (Boris Stemmer); 7 - Acceptance of Wind Turbines - Social Psychological Research (Gundula Huebner); 8 - Local consultation: who to involve, when and how? (Paola Orozco-Souel); 9 - Local acceptability: what dialogue concepts and strategies, and how to manage wind energy objection (Charles Lhermitte); 10 - Re-powering and landscape: chances and limits (Elisabeth Ferus); 11 - Wind power and cultural heritage: consultation and dialogue to succeed (Philippe Benezech); 12

  1. Solar Wind Monitor--A School Geophysics Project

    Science.gov (United States)

    Robinson, Ian

    2018-01-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth's field in…

  2. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Vaught, Douglas J.

    2007-03-31

    The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

  3. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Science.gov (United States)

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... motor carriers that applied to participate in the Agency's long-haul pilot program to test and... intent to proceed with the initiation of a United States- Mexico cross-border long-haul trucking pilot...

  4. Planning your first wind power project. A primer for utilities: Everything you need to know to bring your first wind power plant on-line

    International Nuclear Information System (INIS)

    Conover, K.; Davis, E.

    1994-12-01

    This primer has been prepared to help utility personnel become familiar with some or the details relative to wind power technology and project development. It is written as a series of relatively independent chapters to address specific topics or phases of wind power evaluation and development as they might occur within a utility. The topics include: wind prospecting and the first pass analysis, resource validation, project feasibility, resource planning and evaluation, resource acquisition, project development, equipment selection, project design and construction, and plant operation and maintenance

  5. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  6. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  7. Keys to success for wind power in isolated power systems

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, J C; Lundsager, P; Bindner, H; Hansen, L; Frandsen, S [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark)

    1999-03-01

    It is generally expected that wind power could contribute significantly to the electricity supply in power systems of small and medium sized isolated communities. The market for such applications of wind power has not yet materialized. Wind power in isolated power systems have the main market potentials in developing countries. The money available world-wide for this technological development is limited and the necessary R and D and pilot programmes have difficult conditions. Consequently, technology developed exclusively for developing countries rarely becomes attractive for consumers, investors and funding agencies. A Danish research project is aimed at studying development of methods and guidelines rather than `universal solutions` for the use of wind energy in isolated communities. This paper report on the findings of the project regarding barriers removal and engineering methods development, with a focus on analysis and specification of user demand and priorities, numerical modeling requirements as well as wind power impact on power quality and power system operation. Input will be provided on these subjects for establishing of common guidelines on relevant technical issues, and thereby enabling the making of trustworthy project preparation studies. (au) EFP-97. 12 refs.

  8. Field experience of a project with the Dutch Consultancy Services Wind Energy Developing Countries (CWD) and traditional wind pumps in Nicaragua

    International Nuclear Information System (INIS)

    Holtslag, H.A.G.

    1991-01-01

    The main objective of the title project, which started in October 1986, was to promote the use of wind energy in Nicaragua by means of a study on the wind potential, the production and use of wind pumps, and repairs of traditional wind pumps. Involved in the project were a Dutch project coordinator, a Dutch, a German and a Danish advisor for the technical aspects and a Dutch advisor for irrigation. The Nicaraguan National Institute of Energy coordinated the project until 1988. Then the (state) factory, where the mills were manufactured, took over. The study on the wind potential was only partly completed. The production was done at the state factory in Managua (IMEP), where two models were produced: a traditional mill with a rotor of 3 meter, and a CWD-mill with a rotor of 5 meter. Adaptations, based on field experiences, were made in the CWD-model in the third year of the project. The total production after 4 years was 50 mills of 3 meter and 15 mills of 5 meter. The objective was 200 mills per year after the third year of the project. Of the 3 meter mill, 35 were installed and used mainly for cattle watering (sales price US$ 2,200). Of the 5 meter mill, 7 were installed in demonstration projects for small-scale irrigation (sales price US$ 4,000). The production rate of the 3 meter mill at the end of the project was 10 mills per 8 weeks. Production of the 5 meter mill stopped for several reasons, but may go on when adaptations in the mill prove to be effective. Repairs of the traditional mills could not be realized. The overall conclusion is that the achievements of the project were lower than the original objectives for reasons which are formulated in the conclusions. 3 ills

  9. Prospects for local community wind energy projects in the UK

    International Nuclear Information System (INIS)

    Taylor, Derek; Open Univ., Milton Keynes

    1993-01-01

    This paper examines the prospects for local community wind energy projects in the UK. After explaining the advantages of such projects compared to purely commercial developments, the scale and funding for the projects are discussed. It is argued that such projects are beneficial both financially to individual members and also to the local rural economies particularly in deprived regions. (UK)

  10. Development of a site analysis tool for distributed wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Shawn [The Cadmus Group, Inc., Waltham MA (United States)

    2012-02-28

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

  11. Social barriers in wind power implementation in The Netherlands: Perceptions of wind power entrepreneurs and local civil servants of institutional and social conditions in realizing wind power projects

    International Nuclear Information System (INIS)

    Agterbosch, Susanne; Glasbergen, Pieter; Vermeulen, Walter J.V.

    2007-01-01

    The primary social factors for the implementation of wind energy projects in a liberalized market are entrepreneurs willing to invest. Understanding conditions that trigger entrepreneurs to invest in these projects, and understanding conditions that determine the chance of success for entrepreneurs to implement and exploit their projects, is vital for setting up effective policies to stimulate wind electricity generation. This paper analyses the way in which wind power entrepreneurs and local civil servants experience social and institutional conditions in the operational process of realizing wind power projects, and their perceptions of policy implications. A groups support system in an electronic board room was used to analyze the perceptions. From the analysis it was concluded that wind power entrepreneurs and civil servants share the opinion that the institutionally embedded power position of local politicians, and the sensitiveness of the local political debate for the popular opinion are most critical for project realization. With regard to the proposed solutions, both groups differ in their approach. Entrepreneurs stress procedural solutions, such as limiting the possibilities to appeal, reducing the complexity of the formal authorization trajectory and using a top down planning approach. Civil servants stress more strategic solutions, such as providing more public information on the necessity of wind power for local politicians and citizens, and community involvement in planning processes. Finally, the analysis explains that steering strategies that have been developed at the national level to solve the planning problems at the operational level do not address the right problems. (author)

  12. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and substainability analysis

    DEFF Research Database (Denmark)

    Ringius, L.; Grohnheit, Poul Erik; Nielsen, Lars Henrik

    2002-01-01

    and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana,Egypt is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between......The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment anddevelopment - that is, baseline development......, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, andrecommends methodologies for and approaches to baseline development. To present the application...

  13. The complete atlas of wind farms and projects in France

    International Nuclear Information System (INIS)

    Le Jannic, N.; Guillier, A.

    2012-01-01

    932 wind farms are in operation or in project at the end of the first semester of 2012 in France. Wind energy continues increasing, the total installed power reaches 7182 MW and about 738 MW have been installed during the last 12 months. This document lists all these wind farms and gives some information like the locality, the name of the operator, the power installed, the number of turbines, the name of the turbine manufacturer and the past or future date of commissioning. (A.C.)

  14. Setting up local community wind energy projects

    International Nuclear Information System (INIS)

    Larke, Charmian.

    1993-01-01

    A report is given on progress to establish a company in the UK which involves local people at an early stage in the development of wind farms. Particular attention is paid to obtaining local finance for the projects. Because rural communities tend to be relatively poor, larger investors will need to be involved. (UK)

  15. Agua Caliente Wind/Solar Project at Whitewater Ranch

    Energy Technology Data Exchange (ETDEWEB)

    Hooks, Todd [Agua Caliente Band of Cahuilla Indians, Palm Springs, CA (United States); Stewart, Royce [Red Mountain Energy Partners, Sante Fe, NM (United States)

    2014-12-16

    Agua Caliente Band of Cahuilla Indians (ACBCI) was awarded a grant by the Department of Energy (DOE) to study the feasibility of a wind and/or solar renewable energy project at the Whitewater Ranch (WWR) property of ACBCI. Red Mountain Energy Partners (RMEP) was engaged to conduct the study. The ACBCI tribal lands in the Coachella Valley have very rich renewable energy resources. The tribe has undertaken several studies to more fully understand the options available to them if they were to move forward with one or more renewable energy projects. With respect to the resources, the WWR property clearly has excellent wind and solar resources. The DOE National Renewable Energy Laboratory (NREL) has continued to upgrade and refine their library of resource maps. The newer, more precise maps quantify the resources as among the best in the world. The wind and solar technology available for deployment is also being improved. Both are reducing their costs to the point of being at or below the costs of fossil fuels. Technologies for energy storage and microgrids are also improving quickly and present additional ways to increase the wind and/or solar energy retained for later use with the network management flexibility to provide power to the appropriate locations when needed. As a result, renewable resources continue to gain more market share. The transitioning to renewables as the major resources for power will take some time as the conversion is complex and can have negative impacts if not managed well. While the economics for wind and solar systems continue to improve, the robustness of the WWR site was validated by the repeated queries of developers to place wind and/or solar there. The robust resources and improving technologies portends toward WWR land as a renewable energy site. The business case, however, is not so clear, especially when the potential investment portfolio for ACBCI has several very beneficial and profitable alternatives.

  16. Knowledge Boosting Curriculum for New Wind Industry Professionals Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Marsh, Ruth H; Rogers, Anthony L

    2012-12-18

    the curriculum is based on DNV KEMA's extensive experience in consulting and falls under six general topics: 1. Introduction to wind energy 2. Wind resource and energy assessment 3. Wind turbine systems and components 4. Wind turbine installation, integration, and operation 5. Feasibility studies 6. Project economics Each general topic (module) covers 10-15 sub-topics. Representatives from industry provided input on the design and content of the modules as they were developed. DNV KEMA developed guidance documents to accompany the training curricula and materials in order to facilitate usage of the curricula in a manner consistent with industries requirements. Internal and external pilot trainings using selections of the curriculum provided valuable feedback that was then used to modify and improve the material and make it more relevant to participants. The pilot trainings varied in their content and intensity, and each served as an opportunity for the trainers to better understand which techniques proved to be the most successful for accelerated learning. In addition, the varied length and content of the trainings, which were adjusted to suit the focus and budget for each particular situation, highlight the flexibility of the format. The material developed under this program focused primarily on onshore wind project development. The course material could be extended in the future to address the unique aspects of offshore project development.

  17. 77 FR 24505 - Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings

    Science.gov (United States)

    2012-04-24

    ...] Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings AGENCY... for Wind Retrofit Projects for Existing Residential Buildings. DATES: Comments must be received by... must include the agency name and docket ID. Regardless of the method used for submitting comments or...

  18. Birds and bird habitats: guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-10-01

    Established in 2009, the Green Energy Act aims to increase the use of renewable energy sources including wind, water, solar and bioenergy in Ontario. The development of these resources is a major component of the province's plan, which aims to mitigate the contribution to climate change and to involve the Ontario's economy in the improvement of the quality of the environment. The Green Energy Act also considers as important the implementation of a coordinated provincial approval process, suggesting the integration of all Ministry requirements into a unique process during the evaluation of newly proposed renewable energy projects. The Ministry of the Environment's Renewable Energy Approval Regulation details the requirements for wind power projects involving significant natural features. Birds are an important part of Ontario's biodiversity and, according to the Ministry of Natural Resources, their habitats are considered as significant wildlife habitat (SWH). The Renewable Energy Approval Regulation and this guideline are meant to provide elements and guidance in order to protect bird SWH during the selection of a location of wind power facilities. . 27 refs., 1 tab., 2 figs.

  19. Assessing the potential of wind energy projects. Notes for developers

    International Nuclear Information System (INIS)

    1999-11-01

    The objective of this publication is to provide some initial guidance for people who may be considering installing a wind power project. It sets out some key points which should be considered in a preliminary feasibility study and economic assessment of a project. (author)

  20. A Vision in Aeronautics: The K-12 Wind Tunnel Project

    Science.gov (United States)

    1997-01-01

    A Vision in Aeronautics, a project within the NASA Lewis Research Center's Information Infrastructure Technologies and Applications (IITA) K-12 Program, employs small-scale, subsonic wind tunnels to inspire students to explore the world of aeronautics and computers. Recently, two educational K-12 wind tunnels were built in the Cleveland area. During the 1995-1996 school year, preliminary testing occurred in both tunnels.

  1. Development of a wind farm noise propagation prediction model - project progress to date

    International Nuclear Information System (INIS)

    Robinson, P.; Bullmore, A.; Bass, J.; Sloth, E.

    1998-01-01

    This paper describes a twelve month measurement campaign which is part of a European project (CEC Project JOR3-CT95-0051) with the aim to substantially reduce the uncertainties involved in predicting environmentally radiated noise levels from wind farms (1). This will be achieved by comparing noise levels measure at varying distances from single and multiple sources over differing complexities of terrain with those predicted using a number of currently adopted sound propagation models. Specific objectives within the project are to: establish the important parameters controlling the propagation of wind farm noise to the far field; develop a planning tool for predicting wind farm noise emission levels under practically encountered conditions; place confidence limits on the upper and lower bounds of the noise levels predicted, thus enabling developers to quantify the risk whether noise emission from wind farms will cause nuisance to nearby residents. (Author)

  2. Advanced Wind Turbine Program Next Generation Turbine Development Project: June 17, 1997--April 30, 2005

    Energy Technology Data Exchange (ETDEWEB)

    GE Wind Energy, LLC

    2006-05-01

    This document reports the technical results of the Next Generation Turbine Development Project conducted by GE Wind Energy LLC. This project is jointly funded by GE and the U.S. Department of Energy's National Renewable Energy Laboratory.The goal of this project is for DOE to assist the U.S. wind industry in exploring new concepts and applications of cutting-edge technology in pursuit of the specific objective of developing a wind turbine that can generate electricity at a levelized cost of energy of $0.025/kWh at sites with an average wind speed of 15 mph (at 10 m height).

  3. International activities and experience in offshore wind power generation; Internationale Aktivitaeten und Erfahrungen im Bereich der Offshore-Windenergienutzung

    Energy Technology Data Exchange (ETDEWEB)

    Rehfeldt, K.; Gerdes, G.J.

    2002-01-01

    Current activities in the area of offshore wind energy are being made only in the European Community in the form of concrete plans or as projects. Denmark and Sweden began as pioneers in the setting up of offshore wind parks along their coast in the Baltic Sea. As a world-wide first, Denmark saw the practicality of offshore wind energy as a way of reducing the emission of CO{sub 2} and opening new doors in the wind energy branch. Essential is not to name the ambitious goals, but that at the designated suitable regions, pilot projects are implemented therefore initiating extensive research and development projects. Our European neighbours have shown us through their own experience what great potential and underlying dynamic offshore wind energy has. The development of projects can be given with confidence to private sector, if however the main consensus from promoters and environmentalists is desired, then in this instance the governmental participation as a guide would be desirable. (orig.)

  4. The role of taxation policy and incentives in wind-based distributed generation projects viability. Ontario case study

    International Nuclear Information System (INIS)

    Albadi, M.H.; El-Saadany, E.F.

    2009-01-01

    Taxation policy and incentives play a vital role in wind-based distributed generation projects viability. In this paper, a thorough techno-economical evaluation of wind-based distributed generation projects is conducted to investigate the effect of taxes and incentives in the economic viability of investments in this sector. This paper considers the effects of Provincial income taxes, capital cost allowance (CCA), property taxes, and wind power production Federal incentives. The case study is conducted for different wind turbines and wind speed scenarios. Given turbine and wind speed data, the Capacity Factor (CF) of each turbine and wind speed scenario was calculated. Net Present Value (NPV) and Internal Rate of Return (IRR) for different scenarios were then used to assess the project's viability considering Ontario Standard Offer Program (SOP) for wind power. (author)

  5. Electrocoagulation project: Pilot study testwork

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Garand, D.K.; Hassan, T.A.; Kar, K.L.; Thind, S.S.

    1991-09-01

    When a suspension or emulsion flows between two sacrificial metal electrodes excited by ac, the dispersed phase is consolidated and then settles. Laboratory-scale investigation of this mechanism, called electrocoagulation, and of its areas of application to water treatment were previously completed and a subsequent project was initiated to design and construct pilot-scale equipment consisting of an electrocoagulation cell, power supply, and computerized control system. The constructed pilot plant was used to test the effectiveness of electrocoagulation to clarify coal processing plant effluent. Results obtained with clay suspensions showed that flow conditions in the cell have a major effect on electric power consumption, and a reduction by a factor of three on this crucial cost parameter appeared possible compared to a previously tested batch-scale electrocoagulation system. Results obtained using the coal plant thickener feed closely duplicated those obtained with the clay mixtures. Aluminum electrode consumption, however, remained unchanged compared to the bench-scale tests. Supernatant clarity far exceeded requirements, while settling rate was too low. The settling could be speeded up by appropriate use of chemicals, but such addition affects the coagulation mechanism and reduces supernatant clarity. A tradeoff between settling rate and clarity was thus established. The total cost of treatment was deemed to be in excess of coal company requirements, but the pilot tests revealed much about the electrocoagulation system under continuous flow conditions. The technology is seen as having application in other areas such as municipal and industrial waste treatment. 22 refs., 6 figs., 2 tabs.

  6. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  7. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  8. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  9. Landscape integration and harmonization assessment guide : wind farm siting project on public land

    Energy Technology Data Exchange (ETDEWEB)

    Bouchard, M.A.; Boudart, M.; Arsenault, M.; Lauzon, M.; Lizotte, C.; Munoz, P.; Poirier, C.; Guimont, C.; Sainte-Marie, L.

    2005-07-01

    The development of a wind farm industry depends greatly on obtaining land use rights. This paper describes a program created by the Quebec Government to make public land available for wind farm construction. In particular, the program allows the government to set aside public land to promote the development of the wind industry in the Gaspe Region and the Matane Regional County Municipality. It also awards land rights for wind farm construction to bidders who have signed wind energy sales contracts with Hydro-Quebec Distribution. The program allows the government to set lease rates for public land used for wind farms based on market rates. This document is a guide used by Quebec's Ministry of Natural Resources to evaluate projects and issue leases for parcels of public land to be used for wind turbine arrays. It identifies major landscape issues associated with wind farms and allows proponents to demonstrate the natural and anthropogenic impacts of a wind farm on the landscape and present mitigative measures to minimize these impacts. This document also identifies the wind farm landscape integration and harmonization principles for public lands in Quebec. It was noted that wind farm projects with 10 MW capacity or less are not subject to guidelines established by the Quebec Ministry of Sustainable Development, Environment and Parks. 23 refs., 2 tabs.

  10. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    International Nuclear Information System (INIS)

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact

  11. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  12. Wind Speed Estimation and Parametrization of Wake Models for Downregulated Offshore Wind Farms within the scope of PossPOW Project

    DEFF Research Database (Denmark)

    Göçmen Bozkurt, Tuhfe; Giebel, Gregor; Poulsen, Niels Kjølstad

    2014-01-01

    With increasing installed capacity, wind farms are requested to downregulate more frequently, especially in the offshore environment. Determination and verification of possible (or available) power of downregulated offshore wind farms are the aims of the PossPOW project (see PossPOW.dtu.dk). Two ...... period. The re-calibrated model has to be further parametrized to include dynamic effects such as wind direction variability and meandering also considering different averaging time scales before implemented in full scale wind farms....

  13. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  14. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  15. Navigating Bioethical Waters: Two Pilot Projects in Problem-Based Learning for Future Bioscience and Biotechnology Professionals.

    Science.gov (United States)

    Berry, Roberta M; Levine, Aaron D; Kirkman, Robert; Blake, Laura Palucki; Drake, Matthew

    2016-12-01

    We believe that the professional responsibility of bioscience and biotechnology professionals includes a social responsibility to contribute to the resolution of ethically fraught policy problems generated by their work. It follows that educators have a professional responsibility to prepare future professionals to discharge this responsibility. This essay discusses two pilot projects in ethics pedagogy focused on particularly challenging policy problems, which we call "fractious problems". The projects aimed to advance future professionals' acquisition of "fractious problem navigational" skills, a set of skills designed to enable broad and deep understanding of fractious problems and the design of good policy resolutions for them. A secondary objective was to enhance future professionals' motivation to apply these skills to help their communities resolve these problems. The projects employed "problem based learning" courses to advance these learning objectives. A new assessment instrument, "Skills for Science/Engineering Ethics Test" (SkillSET), was designed and administered to measure the success of the courses in doing so. This essay first discusses the rationale for the pilot projects, and then describes the design of the pilot courses and presents the results of our assessment using SkillSET in the first pilot project and the revised SkillSET 2.0 in the second pilot project. The essay concludes with discussion of observations and results.

  16. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive

  17. A pilot project to improve access to telepsychotherapy at rural clinics.

    Science.gov (United States)

    Adler, Geri; Pritchett, Lonique R; Kauth, Michael R; Nadorff, Danielle

    2014-01-01

    The U.S. Department of Veterans Affairs (VA) has pioneered telemental health (TMH) with over 500,000 TMH encounters over the past decade. VA community-based outpatient clinics were established to improve accessibility of mental healthcare for rural Veterans. Despite these clinics clinics and increased availability of TMH, many rural Veterans have difficulty receiving mental healthcare, particularly psychotherapy. Twelve therapists participated in a pilot project using TMH technologies to improve mental healthcare service delivery to rural Veterans treated at six community clinics. Therapists completed online training, and study staff communicated with them monthly and clinical leaders every other month. Therapists completed two questionnaires: before training and 10 months later. This article describes barriers and facilitators to the implementation of the project, as well as therapists' knowledge, confidence, and motivation regarding TMH. Two clinicians were offering telepsychotherapy after 10 months. At all six sites, unanticipated organizational constraints and administrative barriers delayed implementation; establishing organizational practices and therapists' motivation helped facilitate the process. Adopters of the project reported more positive views of the modality and did not worry about staffing, a concern of nonadopters. Despite barriers to implementation, lessons learned from this pilot project have led to improvements and changes in TMH processes. Results from the pilot showed that therapists providing telepsychotherapy had increased confidence, knowledge, and motivation. As TMH continues to expand, formalized decision-making with clinical leaders regarding project goals, better matching of therapists with this modality, and assessment of medical center and clinic readiness are recommended.

  18. Financing small scale wind energy projects in the UK

    International Nuclear Information System (INIS)

    Mitchell, Catherine

    1993-01-01

    This paper shows how wind energy projects in the UK have obtained finance. It attempts to list the financing options open to small scale developments and to note any likely problems which may occur. (UK)

  19. The seed of change in society. Diffusion of solar cell systems in housing by means of pilot projects

    International Nuclear Information System (INIS)

    Van Mierlo, B.C.

    2002-01-01

    The central question in this thesis is: in what way can pilot projects contribute to the diffusion of new sustainable technologies, in particular solar cell systems in housing units. The reason for this is, in the first place, that trials, demonstration projects, practical experiments and market introduction projects are often launched by firms and subsidised by the state. The objective of such projects, referred to here as pilot projects, is in general to prepare the market introduction of new technologies. However, these projects are often realised and financed without much information being available on how they operate: about how they could prepare the market launch and how this function could be optimised. The second reason is that since the end of the 1980s the expectations in the Netherlands in respect of solar cell systems (PV systems) connected to the electricity grid have been high. These systems could have great advantages for the environment and after 2010 could be the most important source of sustainable energy. The government sees housing as the most promising market segment for these systems. It is recognised that certain major bottlenecks have to be solved before a large-scale diffusion is possible. According to the niche approach, the basic starting point of this thesis, this means that the existing social-technological regime needs to change: the rules and infrastructure according to which the existing technologies are, as it were, considered self-evident, and which hinder the introduction of new technologies. Subsidised pilot projects form a protected market niche that can stimulate a change in the regime by learning and by the social embedding of the learning experiences. According to this approach, a protected market niche is a necessary component of state-supported innovation policy if market niches do not arise spontaneously. It is, however, a limited instrument since the ultimate impact on existing regimes depends mainly on external factors

  20. Smart City pilot projects : exploring the dimensions and conditions of scaling up

    NARCIS (Netherlands)

    van Winden, W.; van den Buuse, D.J.H.M.

    2017-01-01

    In many cities, pilot projects are set up to test new technologies that help to address urban sustainability issues, improve the effectiveness of urban services, and enhance the quality of life of citizens. These projects, often labelled as “smart city” projects, are typically supported by

  1. Smart city pilot projects, scaling up or fading out? : Experiences from Amsterdam

    NARCIS (Netherlands)

    van Winden, W.

    2016-01-01

    In many cities, pilot projects are set up to test or develop new technologies that improve sustainability, urban quality of life or urban services (often labelled as “smart city” projects). Typically, these projects are supported by the municipality, funded by subsidies, and run in partnerships.

  2. Sampling strategy for a large scale indoor radiation survey - a pilot project

    International Nuclear Information System (INIS)

    Strand, T.; Stranden, E.

    1986-01-01

    Optimisation of a stratified random sampling strategy for large scale indoor radiation surveys is discussed. It is based on the results from a small scale pilot project where variances in dose rates within different categories of houses were assessed. By selecting a predetermined precision level for the mean dose rate in a given region, the number of measurements needed can be optimised. The results of a pilot project in Norway are presented together with the development of the final sampling strategy for a planned large scale survey. (author)

  3. Influencing citizen behavior: experiences from multichannel marketing pilot projects

    NARCIS (Netherlands)

    van de Wijngaert, Lidwien; Pieterson, Willem Jan; Teerling, Marije L.

    2011-01-01

    Information technology allows national and local governments to satisfy the needs of citizens in a cost effective way. Unfortunately, citizens still tend to prefer traditional, more costly channels, such as the front desk, phone and mail. Through pilot projects government agencies attempt to

  4. Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report

    International Nuclear Information System (INIS)

    Johansen, R.

    2011-01-01

    Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

  5. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Science.gov (United States)

    2010-05-04

    ... Proposed Cape Wind Energy Project in Nantucket Sound, Offshore Massachusetts AGENCY: Minerals Management... Energy Project proposed for Nantucket Sound, offshore Massachusetts. On January 16, 2009, the MMS... construct a wind power facility on Horseshoe Shoal in Nantucket Sound, offshore Massachusetts. Following the...

  6. 75 FR 34152 - Record of Decision for the Cape Wind Energy Project; Secretary of the Interior's Response to...

    Science.gov (United States)

    2010-06-16

    ... Preservation on the Cape Wind Energy Project AGENCY: Minerals Management Service, Interior. ACTION: Notice of... announcing the availability of the ROD for the Cape Wind Energy Project (the Project). The ROD for the...), implementing the provisions of NHPA (16 U.S.C. 470 et seq.). SUPPLEMENTARY INFORMATION: Cape Wind Energy...

  7. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects.

    Science.gov (United States)

    Kreps, Gary L

    2005-10-01

    This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations.

  8. State and local economic impacts from wind energy projects: Texas case study

    International Nuclear Information System (INIS)

    Slattery, Michael C.; Lantz, Eric; Johnson, Becky L.

    2011-01-01

    This paper uses the Jobs and Economic Development Impacts (JEDI) model to estimate economic impacts from 1398 MW of wind power development in four counties in west Texas. Project-specific impacts are estimated at the local level (i.e., within a 100-mile radius around the wind farms) and at the state level. The primary economic policy question addressed is how investment in wind energy affects the state and local communities where the wind farms are built. During the four-year construction phase approximately 4100 FTE (full time equivalents) jobs were supported with turbine and supply chain impacts accounting for 58% of all jobs generated. Total lifetime economic activity to the state from the projects equated to more than $1.8 billion, or $1.3 million per MW of installed capacity. The total economic activity to the local communities was also substantial, equating to nearly $730 million over the assumed 20-year life cycle of the farms, or $0.52 million per MW of installed capacity. Given the current level of impacts observed, and the potential for increased impacts via greater utilization of instate manufacturing capacity and the development of trained wind industry specific laborers, Texas appears to be well positioned to see increasing impacts from continued wind development. - Highlights: ► We use the JEDI model to assess economic impacts from wind development in west Texas. ► Total lifetime economic impact from 1398 MW wind equated to more than $1.8 billion. ► Texas is well positioned to see increasing impacts from continued wind development.

  9. Project "Convective Wind Gusts" (ConWinG)

    Science.gov (United States)

    Mohr, Susanna; Richter, Alexandra; Kunz, Michael; Ruck, Bodo

    2017-04-01

    Convectively-driven strong winds usually associated with thunderstorms frequently cause substantial damage to buildings and other structures in many parts of the world. Decisive for the high damage potential are the short-term wind speed maxima with duration of a few seconds, termed as gusts. Several studies have shown that convectively-driven gusts can reach even higher wind speeds compared to turbulent gusts associated with synoptic-scale weather systems. Due to the small-scale and non-stationary nature of convective wind gusts, there is a considerable lack of knowledge regarding their characteristics and statistics. Furthermore, their interaction with urban structures and their influence on buildings is not yet fully understood. For these two reasons, convective wind events are not included in the present wind load standards of buildings and structures, which so far have been based solely on the characteristics of synoptically-driven wind gusts in the near-surface boundary layer (e. g., DIN EN 1991-1-4:2010-12; ASCE7). However, convective and turbulent gusts differ considerably, e.g. concerning vertical wind-speed profiles, gust factors (i.e., maximum to mean wind speed), or exceedance probability curves. In an effort to remedy this situation, the overarching objective of the DFG-project "Convective Wind Gusts" (ConWinG) is to investigate the characteristics and statistics of convective gusts as well as their interaction with urban structures. Based on a set of 110 climate stations of the German Weather Service (DWD) between 1992 and 2014, we analyzed the temporal and spatial distribution, intensity, and occurrence probability of convective gusts. Similar to thunderstorm activity, the frequency of convective gusts decreases gradually from South to North Germany. A relation between gust intensity/probability to orography or climate conditions cannot be identified. Rather, high wind speeds, e.g., above 30 m/s, can be expected everywhere in Germany with almost

  10. Technology Cooperation Agreement Pilot Project (TCAPP)

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.; Benioff, R.

    1999-10-20

    The Technology Cooperation Agreement Pilot Project (TCAPP) is helping developing countries design and implement actions to attract investment in clean energy technologies that will meet their economic development goals, while mitigating greenhouse gas emissions. TCAPP was launched by three US government agencies -- the US Agency for International Development (USAID), the US Environmental Protection Agency (USEPA), and the US Department of Energy (USDOE) -- in August 1997 to establish a model for climate change technology cooperation with developing and transition countries. This report describes the TCAPP approach and the significant progress made by the participating countries.

  11. The NCI Digital Divide Pilot Projects: implications for cancer education.

    Science.gov (United States)

    Kreps, Gary L; Gustafson, David; Salovey, Peter; Perocchia, Rosemarie Slevin; Wilbright, Wayne; Bright, Mary Anne; Muha, Cathy

    2007-01-01

    The National Cancer Institute (NCI) supported four innovative demonstration research projects, "The Digital Divide Pilot Projects," to test new strategies for disseminating health information via computer to vulnerable consumers. These projects involved active research collaborations between the NCI's Cancer Information Service (CIS) and regional cancer control researchers to field test new approaches for enhancing cancer communication in vulnerable communities. The projects were able to use computers to successfully disseminate relevant cancer information to vulnerable populations. These demonstration research projects suggested effective new strategies for using communication technologies to educate underserved populations about cancer prevention, control, and care.

  12. Connecticut warm mix asphalt (WMA) pilot projects 2010 and 2011.

    Science.gov (United States)

    2014-06-01

    WMA overlays were placed in several pilot projects in Connecticut during the 2010 and 2011 construction : seasons. These technologies included Sasobit, Evotherm, Advera, Double-Barrel Green foamed : asphalt as well as SonneWarmix. The res...

  13. Risk management tools from the traditional energy industry to wind energy projects

    International Nuclear Information System (INIS)

    Randall, G.; Marks, R.

    2010-01-01

    Risk-based analysis techniques are used to quantify and prioritize a wide variety of problems within the traditional fossil fuel and nuclear power industries. This poster presentation evaluated some of the risk analysis tools and methods used by the energy industry to quantify and manage wind energy development risks. A comprehensive risk-based approach for identifying the probability and consequences of potential concerns was presented for a sample wind energy project. The process determined objectives in relation to the project's net present value. Contributing domains included the energy production, prices, and operating costs of the project. Decision criteria used to evaluate the desirability of the wind project were then developed. Monte Carlo simulations were the used to aggregate individual risks into an overall total. The contribution of each element to the decision objective was calculated separately. The element outputs were than combined into a measure of aggregate risk exposure. Aggregate results were used to calculate the decision criteria. The decision objective was to determine if the energy cost was less than the avoided cost of other project options. The study showed that the approach can allow decision-makers to mitigate risks. However, the results are dependent on the quality of the input data. tabs., figs.

  14. Medicine Bow wind project

    Science.gov (United States)

    Nelson, L. L.

    1982-05-01

    The Bureau of Reclamation (Bureau) conducted studies for a wind turbine field of 100 MW at a site near Medicine Bow, WY, one of the windiest areas in the United States. The wind turbine system would be electrically interconnected to the existing Federal power grid through the substation at Medicine Bow. Power output from the wind turbines would thus be integrated with the existing hydroelectric system, which serves as the energy storage system. An analysis based on 'willingness to pay' was developed. Based on information from the Department of Energy's Western Area Power Administration (Western), it was assumed that 90 mills per kWh would represent the 'willingness to pay' for onpeak power, and 45 mills per kWh for offpeak power. The report concludes that a 100-MW wind field at Medicine Bow has economic and financial feasibility. The Bureau's construction of the Medicine Bow wind field could demonstrate to the industry the feasibility of wind energy.

  15. Complex terrain experiments in the New European Wind Atlas

    Science.gov (United States)

    Angelou, N.; Callies, D.; Cantero, E.; Arroyo, R. Chávez; Courtney, M.; Cuxart, J.; Dellwik, E.; Gottschall, J.; Ivanell, S.; Kühn, P.; Lea, G.; Matos, J. C.; Palma, J. M. L. M.; Peña, A.; Rodrigo, J. Sanz; Söderberg, S.; Vasiljevic, N.; Rodrigues, C. Veiga

    2017-01-01

    The New European Wind Atlas project will create a freely accessible wind atlas covering Europe and Turkey, develop the model chain to create the atlas and perform a series of experiments on flow in many different kinds of complex terrain to validate the models. This paper describes the experiments of which some are nearly completed while others are in the planning stage. All experiments focus on the flow properties that are relevant for wind turbines, so the main focus is the mean flow and the turbulence at heights between 40 and 300 m. Also extreme winds, wind shear and veer, and diurnal and seasonal variations of the wind are of interest. Common to all the experiments is the use of Doppler lidar systems to supplement and in some cases replace completely meteorological towers. Many of the lidars will be equipped with scan heads that will allow for arbitrary scan patterns by several synchronized systems. Two pilot experiments, one in Portugal and one in Germany, show the value of using multiple synchronized, scanning lidar, both in terms of the accuracy of the measurements and the atmospheric physical processes that can be studied. The experimental data will be used for validation of atmospheric flow models and will by the end of the project be freely available. This article is part of the themed issue ‘Wind energy in complex terrains’. PMID:28265025

  16. Oregon department of transportation small business group twice-monthly payments pilot project : summary report.

    Science.gov (United States)

    2008-07-01

    Oregon Department of Transportation (ODOT) recently completed a pilot study on small business payment practices. In the study, three pilot projects were tested where payments to small business contractors were changed from a monthly payment to twice-...

  17. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects*

    Science.gov (United States)

    Kreps, Gary L.

    2005-01-01

    Objective: This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. Method: The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. Results: The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. Implications: The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations. PMID:16239960

  18. Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The purpose of this environmental assessment (EA) is to provide the U.S. Department of Energy (DOE) and the public with information on potential environmental impacts associated with the development of the Ponnequin Wind Energy Project in Colorado. This EA and public comments received on it will be used in DOE`s deliberations on whether to release funding for the project. This document provides a detailed description of the proposed project and an assessment of potential impacts associated with its construction and operations. Resources and conditions considered in the analysis include streams; wetlands; floodplains; water quality; soils; vegetation; air quality; socioeconomic conditions; energy resources; noise; transportation; cultural resources; visual and land use resources; public health and safety; wildlife; threatened, endangered, and candidate species; and cumulative impacts. The analysis found that the project would have minimal impacts on these resources and conditions, and would not create impacts that exceed the significance criteria defined in this document. 90 refs., 5 figs.

  19. Evaluation of transversal competencies: pilot project in a maths course for first-year business

    OpenAIRE

    Bosch Príncep, Manuela; Morillo, Isabel

    2013-01-01

    The aim of this communication is to describe the results of a pilot project for the assessment of the transversal competency "the capacity for learning and responsibility". This competency is centred on the capacity for the analysis, synthesis, overview, and practical application of newly acquired knowledge. It is proposed by the University of Barcelona in its undergraduate degree courses, through multidisciplinary teaching teams. The goal of the pilot project is to evaluate this competenc...

  20. Mexico Wind Resource Assessment Project

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, M.N.; Elliott, D.L.

    1995-05-01

    A preliminary wind energy resource assessment of Mexico that produced wind resource maps for both utility-scale and rural applications was undertaken as part of the Mexico-U.S. Renewable Energy Cooperation Program. This activity has provided valuable information needed to facilitate the commercialization of small wind turbines and windfarms in Mexico and to lay the groundwork for subsequent wind resource activities. A surface meteorological data set of hourly data in digital form was utilized to prepare a more detailed and accurate wind resource assessment of Mexico than otherwise would have been possible. Software was developed to perform the first ever detailed analysis of the wind characteristics data for over 150 stations in Mexico. The hourly data set was augmented with information from weather balloons (upper-air data), ship wind data from coastal areas, and summarized wind data from sources in Mexico. The various data were carefully evaluated for their usefulness in preparing the wind resource assessment. The preliminary assessment has identified many areas of good-to-excellent wind resource potential and shows that the wind resource in Mexico is considerably greater than shown in previous surveys.

  1. Onshore wind energy potential over Iberia: present and future projections

    Science.gov (United States)

    Rochinha, Carlos A.; Santos, João A.; Liberato, Margarida L. R.; Pinto, Joaquim G.

    2014-05-01

    Onshore grid-connected wind power generation has been explored for more than three decades in the Iberian Peninsula. Further, increasing attention has been devoted to renewable energy sources in a climate change context. While advantages of wind energy are widely recognized, its distribution is not spatially homogeneous and not uniform throughout the year. Hence, understanding these spatial-temporal distributions is critical in power system planning. The present study aims at assessing the potential power output estimated from 10 m wind components simulated by a regional climate model (CCLM), driven by ERA40 reanalysis. Datasets are available on a grid with a high spatial resolution (approximately 20 km) and over a 40-yr period (1961-2000). Furthermore, several target sites, located in areas with high installed wind generation capacity, are selected for local-to-regional scale assessments. The results show that potential wind power is higher over northern Iberia, mostly in Cantabria and Galicia, while Andalucía and Cataluña record the lowest values. With respect to the intra-annual variability, summer is by far the season with the lowest potential energy outputs. Furthermore, the inter-annual variability reveals an overall downward long-term trend over the 40-yr period, particularly in the winter time series. A CCLM transient experiment, forced by the SRES A1B emission scenario, is also discussed for a future period (2041-2070), after a model validation/calibration process (bias corrections). Significant changes in the wind power potential are projected for the future throughout Iberia, but their magnitude largely depends on the locations. This work was partially supported by FEDER (Fundo Europeu de Desenvolvimento Regional) funds through the COMPETE (Programa Operacional Factores de Competitividade) and by national funds through FCT (Fundação para a Ciência e a Tecnologia, Portugal) under project STORMEx FCOMP-01-0124-FEDER- 019524 (PTDC/AAC-CLI/121339/2010).

  2. Lessons Learned From the Environmental Public Health Tracking Sub-County Data Pilot Project.

    Science.gov (United States)

    Werner, Angela K; Strosnider, Heather; Kassinger, Craig; Shin, Mikyong

    2017-12-07

    Small area data are key to better understanding the complex relationships between environmental health, health outcomes, and risk factors at a local level. In 2014, the Centers for Disease Control and Prevention's National Environmental Public Health Tracking Program (Tracking Program) conducted the Sub-County Data Pilot Project with grantees to consider integration of sub-county data into the National Environmental Public Health Tracking Network (Tracking Network). The Tracking Program and grantees developed sub-county-level data for several data sets during this pilot project, working to standardize processes for submitting data and creating required geographies. Grantees documented challenges they encountered during the pilot project and documented decisions. This article covers the challenges revealed during the project. It includes insights into geocoding, aggregation, population estimates, and data stability and provides recommendations for moving forward. National standards for generating, analyzing, and sharing sub-county data should be established to build a system of sub-county data that allow for comparison of outcomes, geographies, and time. Increasing the availability and accessibility of small area data will not only enhance the Tracking Network's capabilities but also contribute to an improved understanding of environmental health and informed decision making at a local level.

  3. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model

    Directory of Open Access Journals (Sweden)

    Hong-ze Li

    2013-01-01

    Full Text Available The external economies of wind power engineering project may affect the operational efficiency of wind power enterprises and sustainable development of wind power industry. In order to ensure that the wind power engineering project is constructed and developed in a scientific manner, a reasonable external economies evaluation needs to be performed. Considering the interaction relationship of the evaluation indices and the ambiguity and uncertainty inherent, a hybrid model of external economies evaluation designed to be applied to wind power engineering project was put forward based on the analytic hierarchy process (AHP and matter-element extension model in this paper. The AHP was used to determine the weights of indices, and the matter-element extension model was used to deduce final ranking. Taking a wind power engineering project in Inner Mongolia city as an example, the external economies evaluation is performed by employing this hybrid model. The result shows that the external economies of this wind power engineering project are belonged to the “strongest” level, and “the degree of increasing region GDP,” “the degree of reducing pollution gas emissions,” and “the degree of energy conservation” are the sensitive indices.

  4. Final Results from A Pilot Project to Investigate Wake Vortex Patterns and Weather Patterns at the Atlantic City Airport by the Richard Stockton College of NJ and the FAA

    Science.gov (United States)

    Trout, Joseph; Manson, J. Russell; King, David; Decicco, Nicolas; Prince, Alyssa; di Mercurio, Alexis; Rios, Manual

    2017-01-01

    Wake Vortex Turbulence is the turbulence generated by an aircraft in flight. This turbulence is created by vortices at the tips of the wing that may decay slowly and persist for several minutes after creation. These vortices and turbulence are hazardous to other aircraft in the vicinity. The strength, formation and lifetime of the turbulence and vortices are effected by many things including the weather. Here we present the final results of the pilot project to investigation of low level wind fields generated by the Weather Research and Forecasting Model and an analysis of historical data. The findings from the historical data and the data simulations were used as inputs for the computational fluid dynamics model (OpenFoam) to show that the vortices could be simulated using OpenFoam. Presented here are the updated results from a research grant, ``A Pilot Project to Investigate Wake Vortex Patterns and Weather Patterns at the Atlantic City Airport by the Stockton University and the FAA''.

  5. Advanced Instrumentation, Information and Control (II and C) Research and Development Facility Buildout and Project Execution of LWRS II and C Pilot Projects 1 and 3

    International Nuclear Information System (INIS)

    Farris, Ronald; Oxstrand, Johanna; Weatherby, Gregory

    2011-01-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II and C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II and C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results

  6. Advanced Engineering Environment FY09/10 pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  7. Reflections on a Coaching Pilot Project in Healthcare Settings

    Science.gov (United States)

    Gurbutt, D. J.; Gurbutt, R.

    2016-01-01

    This paper draws on personal reflection of coaching experiences and learning as a coach to consider the relevance of these approaches in a management context with a group of four healthcare staff who participated in a pilot coaching project. It explores their understanding of coaching techniques applied in management settings via their reflections…

  8. Code of Conduct for wind-power projects - Phase 3; Code of Conduct fuer windkraftprojekte. Phase 3 Machbarkeit und Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-11-15

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  9. Wind-Diesel Hybrid Systems for Russia's Northern Territories

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V.; Touryan, K. [National Renewable Energy Laboratory (US); Bezrukikh, P. [Ministry of Fuel and Energy of Russian Federation (RU); Bezrukikh, P. Jr.; Karghiev, V. [Intersolarcenter

    1999-10-20

    This paper will summarize the DOE/Russian Ministry of Fuel and Energy (MF and E) activities in Russia's Northern Territories in the field of hybrid wind-diesel power systems over the last three years (1997-1999). The National Renewable Energy Laboratory (NREL) supplied technical assistance to the project, including resource assessment, system design, site identification, training and system monitoring. As a result, several wind-diesel systems have been installed and are operating in the Arkhangelsk/Murmansk regions and in Chukotka. NREL designed and provided sets of data acquisition equipment to monitor several of the first pilot wind-diesel systems. NREL's computer simulation models are being used for performance data analysis and optimizing of future system configurations.

  10. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions

  11. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Science.gov (United States)

    2010-03-08

    ... Proposed Cape Wind Energy Project in Nantucket Sound, MA AGENCY: Minerals Management Service (MMS... MMS for the Cape Wind Energy Project proposed for Nantucket Sound, Massachusetts. On January 16, 2009... facility on Horseshoe Shoal in Nantucket Sound, Massachusetts. Following the adoption of the Energy Policy...

  12. An Integrated Assessment Framework of Offshore Wind Power Projects Applying Equator Principles and Social Life Cycle Assessment

    Directory of Open Access Journals (Sweden)

    Yu-Che Tseng

    2017-10-01

    Full Text Available This paper reviews offshore wind power project finance and provides an integrated assessment that employs Equator Principles, life cycle assessment, risk assessment, materiality analysis, credit assessment, and ISAE 3000 assurance. We have not seen any comprehensive review papers or book chapters that covers the entire offshore wind power project finance process. We also conducted an SWancor Formosa Phase 1 case study to illustrate the application of integrated assessment to better assist policymakers, wind farm developers, practitioners, potential investors and observers, and stakeholders in their decisions. We believe that this paper can form part of the effort to reduce information asymmetry and the transaction costs of wind power project finance, as well as mobilize green finance investments from the financial sector to renewable energy projects to achieve a national renewable energy policy.

  13. Live Storybook Outcomes of Pilot Multidisciplinary Elementary Earth Science Collaborative Project

    Science.gov (United States)

    Soeffing, C.; Pierson, R.

    2017-12-01

    Live Storybook Outcomes of pilot multidisciplinary elementary earth science collaborative project Anchoring phenomena leading to student led investigations are key to applying the NGSS standards in the classroom. This project employs the GLOBE elementary storybook, Discoveries at Willow Creek, as an inspiration and operational framework for a collaborative pilot project engaging 4th grade students in asking questions, collecting relevant data, and using analytical tools to document and understand natural phenomena. The Institute of Global Environmental Strategies (IGES), a GLOBE Partner, the Outdoor Campus, an informal educational outdoor learning facility managed by South Dakota Game, Fish and Parks, University of Sioux Falls, and All City Elementary, Sioux Falls are collaborating partners in this project. The Discoveries at Willow Creek storyline introduces young students to the scientific process, and models how they can apply science and engineering practices (SEPs) to discover and understand the Earth system in which they live. One innovation associated with this project is the formal engagement of elementary students in a global citizen science program (for all ages), GLOBE Observer, and engaging them in data collection using GLOBE Observer's Cloud and Mosquito Habitat Mapper apps. As modeled by the fictional students from Willow Creek, the 4th grade students will identify their 3 study sites at the Outdoor Campus, keep a journal, and record observations. The students will repeat their investigations at the Outdoor Campus to document and track change over time. Students will be introduced to "big data" in a manageable way, as they see their observations populate GLOBE's map-based data visualization and . Our research design recognizes the comfort and familiarity factor of literacy activities in the elementary classroom for students and teachers alike, and postulates that connecting a science education project to an engaging storybook text will contribute to a

  14. 78 FR 17718 - Notice of Availability of a Record of Decision for the Searchlight Wind Energy Project, Clark...

    Science.gov (United States)

    2013-03-22

    ... Searchlight Wind Energy Project, Clark County, NV AGENCY: Bureau of Land Management, Interior. ACTION: Notice... Record of Decision (ROD) for the Searchlight Wind Energy Project. The Department of the Interior... internet at http://www.blm.gov/nv/st/en/fo/lvfo/blm_programs/energy/searchlight_wind_energy.html . FOR...

  15. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    Science.gov (United States)

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural

  16. Pilot project - Promoting protection of the right to housing

    DEFF Research Database (Denmark)

    This study was undertaken for the European Commission Directorate-General for Employment, Social Affairs & Inclusion as part of the ‘Promoting protection of the right to housing - Homelessness prevention in the context of evictions’ pilot project. The key objectives of the research were: - to pro......This study was undertaken for the European Commission Directorate-General for Employment, Social Affairs & Inclusion as part of the ‘Promoting protection of the right to housing - Homelessness prevention in the context of evictions’ pilot project. The key objectives of the research were......: - to provide an overview and analysis of available data and trends regarding housing evictions between 2010 and 2013 across the 28 EU Member States; - to establish the reasons for and impacts of eviction, in particular the relative importance of eviction as a pathway into homelessness; - to analyse...... the legislative and regulatory framework and the availability, effectiveness and cost-efficiency of measures designed to prevent and tackle evictions and enable early interventions; - to suggest ways to improve data collection and the monitoring of evictions in the Member States, identifying the most important...

  17. Noise from wind turbines. Final report of project JOU2-CT92-0124

    International Nuclear Information System (INIS)

    Van der Borg, N.; Andersen, B.; Mackinnon, A.; Klug, H.; Theofiloyannakos, D.

    1995-04-01

    Part of the planning procedure for the erection of a wind turbine or a wind farm is the prediction of the acoustic noise due to the wind turbine(s) at the nearest dwelling. The noise is normally predicted using the acoustic characteristics of the regarded wind turbine as measured on a wind turbine of equal make and model and using a general noise propagation model. Both inputs introduce uncertainties in the predicted noise level: (a) turbines of equal make and model may have different acoustic characteristics; (b) the acoustic characteristics of a turbine may change in time - from day to day (repeatability of the measurement), - during the years (ageing of the turbine); (c) the general propagation model does not take into account the effects of source elevation and wind. The project aimed at the quantification of these uncertainties and at the development of a wind turbine noise propagation model. Statistical information has been collected on the individual differences of the sound power and tonality of turbines of equal make and model by measuring 6 different types of wind turbines. Of each type 5 individual turbines have been measured (total 30 turbines). Additionally the sound power of a series of 4 wind turbines and of a series of 29 wind turbines (from earlier measurements) have been introduced into the project. Statistical information has been collected on the day to day variations of the sound power and tonality of wind turbines by measuring 3 different turbines 5 times (total 15 measurements). Statistical information has been collected on the effect of ageing on the sound power and tonality of wind turbines by the repeated measurement of 5 wind turbines that have been measured in an identical situation 3 to 7 years earlier. A method for the prediction of wind turbine noise propagation has been developed based on measurements of sound propagation from an elevated noise source and theoretical calculations. (Abstract Truncated)

  18. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    Science.gov (United States)

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  19. Recycling entire DOE facilities: The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Floyd, D.R.

    1996-01-01

    The Mission of the National Conversion Pilot Project - to demonstrate, at the Rocky Flats Site, the feasibility of economic conversion of DOE Sites - is succeeding. Contaminated facilities worth $92 million are being cleaned and readied for reuse by commercial industry to manufacture products needed in the DOE cleanup and elsewhere. Former Rocky Flats workers have been hired, recultured, are conducting the cleanup and are expected to perform the future manufacturing by recycling DOE RSM and other metals requiring special environmental controls. Stakeholder sway over project activities is welcome and strong

  20. A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan

    2006-01-01

    For years, farmers in the United States have looked with envy on their European counterparts' ability to profitably farm the wind through ownership of distributed, utility-scale wind projects. Only within the past few years, however, has farmer- or community-owned wind power development become a reality in the United States. The primary hurdle to this type of development in the United States has been devising and implementing suitable business and legal structures that enable such projects to take advantage of tax-based federal incentives for wind power. This article discusses the limitations of such incentives in supporting farmer- or community-owned wind projects, describes four ownership structures that potentially overcome such limitations, and finally conducts comparative financial analysis on those four structures, using as an example a hypothetical 1.5 MW farmer-owned project located in the state of Oregon. We find that material differences in the competitiveness of each structure do exist, but that choosing the best structure for a given project will largely depend on the conditions at hand; e.g., the ability of the farmer(s) to utilize tax credits, preference for individual versus 'cooperative' ownership, and the state and utility service territory in which the project will be located

  1. Developing collaborative person-centred practice: a pilot project on a palliative care unit.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Gravelle, Debbie; Thibault, Hélène

    2007-02-01

    Maximizing interprofessional collaborative patient-centred practice holds promise for improving patient care and creating satisfying work roles. In Canada's evolving health care system, there are demands for increased efficiency, cost-effectiveness, and quality improvement. Interprofessional collaboration warrants re-examination because maximizing interprofessional collaboration, especially nurse-physician collaboration, holds promise for improving patient care and creating satisfying work roles. A palliative care team seized the opportunity to pilot a different approach to patient and family care when faced with a reduction in medical staff. Grounded in a collaborative patient-centred practice approach, the Canadian Hospice Palliative Care Association's National Model to Guide Hospice Palliative Care (2002), and outcomes from program retreats and workgroups, a collaborative person-centred model of care was developed for a 12-bed pilot project. Preliminary findings show that the pilot project team perceived some specific benefits in continuity of care and interprofessional collaboration, while the presence of the physician was reduced to an average of 3.82 hours on the pilot wing, compared with 8 hours on the non-pilot wings. This pilot study suggests that a person-centred model, when focused on the physician-nurse dyad, may offer improved efficiency, job satisfaction and continuity of care on a palliative care unit. Incorporating all team members and developing strategies to successfully expand the model across the whole unit are the next challenges. Further research into the impact of these changes on the health care professionals, management and patients and families is essential.

  2. Tehachapi Wind Energy Storage Project - Technology Performance Report #3

    Energy Technology Data Exchange (ETDEWEB)

    Pinsky, Naum [Southern California Edison, Rosemead, CA (United States); O' Neill, Lori [Southern California Edison, Rosemead, CA (United States)

    2017-03-31

    The TSP is located at SCE’s Monolith Substation in Tehachapi, California. The 8 MW, 4 hours (32 MWh) BESS is housed in a 6,300 square foot facility and 2 x 4 MW/4.5 MVA smart inverters are on a concrete pad adjacent to the BESS facility. The project will evaluate the capabilities of the BESS to improve grid performance and assist in the integration of large-scale intermittent generation, e.g., wind. Project performance was measured by 13 specific operational uses: providing voltage support and grid stabilization, decreasing transmission losses, diminishing congestion, increasing system reliability, deferring transmission investment, optimizing renewable-related transmission, providing system capacity and resources adequacy, integrating renewable energy (smoothing), shifting wind generation output, frequency regulation, spin/non-spin replacement reserves, ramp management, and energy price arbitrage. Most of the operations either shift other generation resources to meet peak load and other electricity system needs with stored electricity, or resolve grid stability and capacity concerns that result from the interconnection of intermittent generation. SCE also demonstrated the ability of lithium ion battery storage to provide nearly instantaneous maximum capacity for supply-side ramp rate control to minimize the need for fossil fuel-powered back-up generation. The project began in October, 2010 and will continue through December, 2016.

  3. Final Report for Project: Impacts of stratification and non-equilibrium winds and waves on hub-height winds

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Edward G. [Univ. Corporation for Atmospheric Research, Boulder, CO (United States)

    2015-07-14

    This project used a combination of turbulence-resolving large-eddy simulations, single-column modeling (where turbulence is parameterized), and currently available observations to improve, assess, and develop a parameterization of the impact of non-equilibrium wave states and stratification on the buoy-observed winds to establish reliable wind data at the turbine hub-height level. Analysis of turbulence-resolving simulations and observations illuminates the non-linear coupling between the atmosphere and the undulating sea surface. This analysis guides modification of existing boundary layer parameterizations to include wave influences for upward extrapolation of surface-based observations through the turbine layer. Our surface roughness modifications account for the interaction between stratification and the effects of swell’s amplitude and wavelength as well as swell’s relative motion with respect to the mean wind direction. The single-column version of the open source Weather and Research Forecasting (WRF) model (Skamarock et al., 2008) serves as our platform to test our proposed planetary boundary layer parameterization modifications that account for wave effects on marine atmospheric boundary layer flows. WRF has been widely adopted for wind resource analysis and forecasting. The single column version is particularly suitable to development, analysis, and testing of new boundary layer parameterizations. We utilize WRF’s single-column version to verify and validate our proposed modifications to the Mellor-Yamada-Nakanishi-Niino (MYNN) boundary layer parameterization (Nakanishi and Niino, 2004). We explore the implications of our modifications for two-way coupling between WRF and wave models (e.g.,Wavewatch III). The newly implemented parameterization accounting for marine atmospheric boundary layer-wave coupling is then tested in three-dimensional WRF simulations at grid sizes near 1 km. These simulations identify the behavior of simulated winds at the

  4. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  5. Review report 2003. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-15

    The present review report presents the two wind farms Homs Rev and Nysted, with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on methods, programmes and conclusions can be found in these reports. This review report is divided into two parts. The first part contains a description of the potential environmentally impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Hors Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated at the bdsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  6. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  7. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  8. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2015-01-01

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  9. Computer Hardware, Advanced Mathematics and Model Physics pilot project final report

    International Nuclear Information System (INIS)

    1992-05-01

    The Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) Program was launched in January, 1990. A principal objective of the program has been to utilize the emerging capabilities of massively parallel scientific computers in the challenge of regional scale predictions of decade-to-century climate change. CHAMMP has already demonstrated the feasibility of achieving a 10,000 fold increase in computational throughput for climate modeling in this decade. What we have also recognized, however, is the need for new algorithms and computer software to capitalize on the radically new computing architectures. This report describes the pilot CHAMMP projects at the DOE National Laboratories and the National Center for Atmospheric Research (NCAR). The pilot projects were selected to identify the principal challenges to CHAMMP and to entrain new scientific computing expertise. The success of some of these projects has aided in the definition of the CHAMMP scientific plan. Many of the papers in this report have been or will be submitted for publication in the open literature. Readers are urged to consult with the authors directly for questions or comments about their papers

  10. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  11. Critical evaluation of the Roan wind farm (part of the Fosen wind project from an impact assessment standpoint

    Directory of Open Access Journals (Sweden)

    Aleksey I. Patonia

    2017-09-01

    Full Text Available The paper views the Roan wind farm, which is a part of the Fosen Vind Project — the biggest planned onshore wind farm in Europe — from an impact assessment standpoint. Using the traditional stages of the impact assessment (such as screening, scoping and identification of the baseline conditions and crucial impacts, the research implements the ‘traffic light system’ to assess the magnitude of the core effects of the project on different dimensions — i.e. society and nature. Even though the previously conducted assessment describes the project as an extremely successful one with huge potential of generating sustainable energy, the current analysis reveals some of its greatest shortcomings. Social and wildlife aspects are its major drawbacks: the construction site is on the grounds used for the summer grazing by the Saami reindeers and the height and number of turbines significantly threatens migrating birds. Thus, even though the project happens to be economically attractive, it is a rather controversial undertaking when viewed from social and natural perspectives. The paper thus presents many solutions for the minimization of these negative impacts.

  12. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  13. OC5 Project Phase II: Validation of Global Loads of the DeepCwind Floating Semisubmersible Wind Turbine

    DEFF Research Database (Denmark)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    2017-01-01

    This paper summarizes the findings from Phase II of the Offshore Code Comparison, Collaboration, Continued, with Correlation project. The project is run under the International Energy Agency Wind Research Task 30, and is focused on validating the tools used for modeling offshore wind systems thro...

  14. 76 FR 41238 - Post Rock Wind Power Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2011-07-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-3959-000] Post Rock Wind Power Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Rock Wind Power Project, LLC's application for market-based rate authority, with an accompanying rate...

  15. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  16. Addressing Spatial Variability of Surface-Layer Wind with Long-Range WindScanners

    DEFF Research Database (Denmark)

    Berg, Jacob; Vasiljevic, Nikola; Kelly, Mark C.

    2015-01-01

    of the WindScanner data is high, although the fidelity of the estimated vertical velocity component is significantly limited by the elevation angles of the scanner heads. The system of long-range WindScanners presented in this paper is close to being fully operational, with the pilot study herein serving...

  17. The national conversion pilot project

    International Nuclear Information System (INIS)

    Van Der Puy, M.; Francis, G.; Konczal, M.

    1994-01-01

    The Department of Energy is now faced with the prospect of terminating traditional defense production missions at several Department of Energy sites. Because of this, there is a critical need to develop a DOE process to convert former defense production facilities to private use so that underutilized workers and facilities may be used to minimize the impact on the United States economy. The purpose of the National Conversation Pilot Project (NCPP) at Rocky Flats near Denver, Colorado is to explore and demonstrate the feasibility of economic conversion of DOE facilities, in a manner consistent with ongoing site waste management and cleanup activities, and non-prejudicial to future land use planning decisions. The NCPP is divided into three stages: The first stage, now under way, is one of detailed planning for cleanup and building maintenance activities. The second stage involves building cleanup necessary to support the proposed industrial activities, maintenance of equipment and building infrastructure necessary to assure protection of human health and the environment, declassification work, and some small scale research and development activities. Stage III would involve DOE metals recycling. Specific approval from the DOE is required prior to each project stage. To ensure stakeholder involvement, a steering committee will advise the DOE on the desirability to proceed with the project from stage to stage. A key question in the conversion process is whether a competitive economic and regulatory environment can be created on a DOE facility, allowing an onsite conversion business to effectively compete with offsite businesses. If successful, the Rocky Flats project could become the model for economic conversion at other DOE facilities

  18. Study of decision framework of wind farm project plan selection under intuitionistic fuzzy set and fuzzy measure environment

    International Nuclear Information System (INIS)

    Wu, Yunna; Geng, Shuai; Xu, Hu; Zhang, Haobo

    2014-01-01

    Highlights: • Experts’ opinions are expressed by using the intuitionistic fuzzy values. • Fuzzy measure is used to solve the dependence problem of criteria. • The compensatory problem of performance scores is reasonably processed. - Abstract: Project selection plays an important role in the entire life cycle of wind farm project and the multi-criteria decision making (MCDM) methods are very important in the whole wind farm project plan selection process. There are problems in the present MCDM methods decrease evaluation quality of the wind farm project plans: first, the information loss exists in the wind farm project plan evaluation process. Second, it is difficult to satisfy the independent assumption of the multi-criteria decision making methods used in the wind farm project plan evaluation in fact. Third, the compensatory problem of performance scores of the wind farm project plans is processed unreasonably. Hence the innovation points of this paper are as follows: first, the intuitionistic fuzzy numbers are used instead of fuzzy numbers or numerical values to reflect the experts’ intuitive preferences to decrease the probability of information loss; second, the fuzzy measure is used to rate the important degrees of criteria in order to avoid the independent assumption and to increase the reasonability; third, the partial compensatory problem of performance scores is well processed by using intuitionistic fuzzy Choquet (IFC) operator and generalized intuitionistic fuzzy ordered geometric averaging (GIFOGA) operator. These operators can deal with the compensatory performance scores and non-compensatory performance scores respectively. Finally, a case study demonstrates the effectiveness of decision framework

  19. Bio-Manufacturing to market pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Dressen, Tiffaney [Univ. of California, Berkeley, CA (United States)

    2017-09-25

    The Bio-Manufacturing to Market pilot project was a part of the AMJIAC, the Advanced Manufacturing Jobs and Innovation Accelerator Challenge grant. This internship program set out to further define and enhance the talent pipeline from the University and local Community Colleges to startup culture in East Bay Area, provide undergraduate STEM students with opportunities outside academia, and provide startup companies with much needed talent. Over the 4 year period of performance, the Bio-Manufacturing to Market internship program sponsored 75 undergraduate STEM students who were able to spend anywhere from one to six semesters working with local Bay Area startup companies and DOE sponsored facilities/programs in the biotech, bio-manufacturing, and biomedical device fields.

  20. The Ukrainian pilot project “Stop radon”

    Directory of Open Access Journals (Sweden)

    Pavlenko Tatyana

    2014-01-01

    Full Text Available In 2010 one area of Ukraine (Kirovograd area was selected for a pilot project to reduce radon risks. The project consists of several stages: radon risk training for the public health professionals, measurements of radon concentration in schools and nurseries (more than 1000 buildings were examined, justifications of radon countermeasures and their implementation. The lognormal frequency distribution for equivalent equilibrium concentration was authentically established. The geometric mean of the indoor radon equivalent equilibrium concentration was established to 63 Bq/m3, and standard deviation is equal to 82 Bq/m3. The indoor radon equivalent equilibrium concentration ranged from 22 Bq/m3 to 809 Bq/m3. It was found that the national regulatory limit for this type of buildings was exceeded in more than 50% of the cases. The second phase of the project has a goal to remediate radon levels and reduce radon risks. Calculated exposure doses and radon risk were used to justify the remediation and assess the economic loss for the region caused by radon irradiation of the population.

  1. SAT-WIND project. Final report

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Astrup, Poul; Nielsen, Niels Morten

    microwave, altimeter, scatterometer and imaging Synthetic Aperture Radar (SAR) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas including the North Sea, interior seas and the Baltic Sea. The report describes technical details on the satellite data...

  2. NaiKun Offshore Wind Energy Project environmental assessment certificate[In the matter of the Environmental Assessment Act S.B.C. 2002, c 43 and in the matter of an application for an Environmental Assessment Certificate by NaiKun Wind Development Inc. for the NaiKun Offshore Wind Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    NaiKun Wind Development Inc. has proposed to build a 396 MW wind turbine array to connect Haida Gwaii in the Queen Charlotte Islands to British Columbia's main electricity grid via NaiKun's generation facility. The project involves the installation of 67 to 110 wind turbine generators at the project site. The project also includes an underwater cable and overland transmission line connecting to BC Hydro's grid. An environmental assessment (EA) was undertaken by British Columbia's Environmental Assessment Office (EAO) to evaluate the potential effects on marine physical environment; land use; marine aquatic ecology; visual resources; marine mammals; radio communications; marine birds; navigation; terrestrial ecology; archaeological and heritage resources; employment and economy; and public health. The EAO also assessed relevant issues raised by First Nations during the course of the EA. Upon considering the results of the EA, the BC Ministry of Energy, Mines and Petroleum Resources granted an EA certificate to NaiKun Wind Development Inc. for its proposed offshore wind energy project. The EA certificate contains many conditions that the proponent must implement throughout various stages of the project. Key commitments include undertaking a joint research project with the local crab fishery; determining the movement of sediment relative to beaches and navigation in the area; implementing an adaptive management plan for marine birds; and implementing a monitoring plan to identify any unforeseen impacts to values and recreational use of Naikoon Provincial Park. Before the project can proceed, the proponent will require provincial licenses, leases and other approvals, as well as necessary federal approvals. tabs.

  3. A European Seal of Approval for 'gay' businesses: findings from an HIV-prevention pilot project.

    Science.gov (United States)

    Sherriff, Nigel; Gugglberger, Lisa

    2014-05-01

    'Gay' businesses can be important settings through which to deliver health promotion interventions to vulnerable populations, such as men who have sex with men (MSM) regarding HIV prevention. This article draws on data from the European Everywhere project, which represents the first scheme to develop and pre-test a common framework for HIV/STI prevention in 'gay' businesses across eight European countries. The scientific basis of the Everywhere framework was developed using a comprehensive consensus-building process over 30 months. This process included: formative scoping research; interviews with 54 'gay' businesses; meetings/workshops with representatives from project partners, 'gay' businesses, public health administrations and external experts; 15 interviews and three focus groups with project partners; a five-month pilot action phase in eight countries, together with support from the project's Advisory Group; and all Everywhere project partners including the Scientific Steering Committee. A voluntary European code setting out differentiated HIV/STI-prevention standards for 'gay' businesses (including sex venues, 'gay' and 'gay' friendly social spaces, travel agencies, hotels, dating websites) was developed and piloted in eight European cities. During a five-month pilot action, 83 'gay' businesses were certified with the Everywhere Seal of Approval representing a considerable increase on the expected pilot target of 30. Everywhere offers a major contribution to the public health and/or health promotion field in the form of a practical, policy-relevant, settings-based HIV-prevention framework for 'gay' businesses that is common across eight European countries. Findings suggest that a European-wide model of prevention is acceptable and feasible to businesses.

  4. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  5. QR Codes in the Library: Are They Worth the Effort? Analysis of a QR Code Pilot Project

    OpenAIRE

    Wilson, Andrew M.

    2012-01-01

    The literature is filled with potential uses for Quick Response (QR) codes in the library. Setting, but few library QR code projects have publicized usage statistics. A pilot project carried out in the Eda Kuhn Loeb Music Library of the Harvard College Library sought to determine whether library patrons actually understand and use QR codes. Results and analysis of the pilot project are provided, attempting to answer the question as to whether QR codes are worth the effort for libraries.

  6. Evaluation of the midwifery pilot projects in Quebec: an overview. L'Equipe d'Evaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Blais, R; Joubert, P

    2000-01-01

    In 1990, the province of Quebec adopted a law authorizing the evaluation of the practice of midwifery through eight pilot projects. The projects, which took the form of birth centres outside hospitals, started operating in 1994. The objectives of the evaluation were 1) to compare midwives' services to current physician services with regard to maternal and neonatal mortality and morbidity, the use of obstetrical intervention, individualization and continuity of care as perceived by clients, and cost; and 2) to identify the professional and organizational factors associated with the integration of midwives into the health care system. A mixed evaluative design was used: a multiple case study with each pilot project representing a case and a cohort study where 1,000 women followed by midwives in the birth centres were matched with 1,000 women followed by physicians in the usual hospital-based services. Various quantitative and qualitative data collection instruments were used. Overall, many results were favourable to midwifery practice, while some were favourable to medical care. Following the evaluation, the Government of Quebec decided to legalize the practice of midwifery.

  7. Monitoring and evaluation of Blyth Offshore Wind Farm. Projected operation and maintenance costs of UK offshore wind farms based on the experience at Blyth

    Energy Technology Data Exchange (ETDEWEB)

    Greig, E.

    2004-07-01

    This is the fifth of seven reports in this series on specific aspects of the monitoring and evaluation of the Blyth offshore wind farm project. The report assesses the operation and maintenance (O and M) costs for the wind farm in its first full year of operation, and extrapolates these costs to give indicative costs for larger projects. It identifies both planned regular costs and unplanned site maintenance costs; some costs can be attributed to 'troubleshooting' during installation and would not be expected in future years. The Blyth wind farm, the first in the UK, consists of two 2 MW wind turbines installed approximately 1 km from the coast in water about 6 m deep at low tide. The site is exposed to the full impact of the North Sea weather, breaking waves and a significant tidal range (about 5 m). Location, boat availability, weather and insurance are identified as the key factors affecting O and M costs for future offshore wind farms in the UK.

  8. Energy Yield Prediction of Offshore Wind Farm Clusters at the EERA-DTOC European Project

    DEFF Research Database (Denmark)

    Cantero, E.; Hasager, Charlotte Bay; Réthoré, Pierre-Elouan

    2014-01-01

    third-party models. Wake models have been benchmarked on the Horns Rev and, currently, on the Lilgrund wind farm test cases. Dedicated experiments from ‘BARD Offshore 1’ wind farm will using scanning lidars will produce new data for the validation of wake models. Furthermore, the project includes power...

  9. Energy yield prediction of offshore wind farm clusters at the EERA-DTOC European project

    DEFF Research Database (Denmark)

    Cantero, E.; Sanz, J.; Lorenzo, S.

    2013-01-01

    third-party models. Wake models have been benchmarked on the Horns Rev and, currently, on the Lilgrund wind farm test cases. Dedicated experiments from ‘BARD Offshore 1’ wind farm will using scanning lidars will produce new data for the validation of wake models. Furthermore, the project includes power...

  10. Noise emission from wind turbines in wake. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Dam Madsen, K.; Plovsing, B. (DELTA, Hoersholm (Denmark)); Soerensen, Thomas (EMD International A/S, Aalborg (Denmark)); Aagaard Madsen, H.; Bertagnolio, F. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy, Roskilde (Denmark))

    2011-03-15

    When installing wind turbines in clusters or wind farms the inflow conditions to the wind turbines can be disturbed due to wake effects from other wind turbines. The effect of wake on noise generation from wind turbines are described in this report. The work is based on measurements carried out on a M80 2 MW wind turbine. To investigate the relationship between the far field noise levels and the surface pressure and inflow angles measured by sensors on an instrumented wind turbine blade, a parabolic measurement system (PMMS) was designed and tested as part of this project. Based on the measurement results obtained with surface pressure sensors and results from the far field measurements using the PMMS it is concluded that: The variance of surface pressure at the trailing edge (TE) agrees with the theory with regard to variation of pressure spectra with varying inflow angle (AoA) to the blade. Low frequency TE surface pressure increases with increased AoA and high frequency surface pressure decreases with increased AoA. It seems that the TE surface pressure remains almost unaltered during wake operation. Results from the surface transducers at the leading edge (LE) and the inflow angles determined from the pitot tube indicates that the inflow at LE is more turbulent in wake for the same AoA and with a low frequency characteristic, thereby giving rise to more low frequency noise generated during wake operation. The far field measurements supports that on one hand there will be produced relative more low frequency noise due to a turbulent inflow to the blade and on the other hand there will be produced less noise in the broader frequency range/high frequency range due to a lower inflow angle caused by the wind deficit in the wake. The net effect of wake on the total noise level is unresolved. As a secondary result it is seen that noise observed from a position on the ground is related to directional effects of the noise radiated from the wind turbine blade. For an

  11. Towards a mature offshore wind energy technology - guidelines from the opti-OWECS project

    Science.gov (United States)

    Kühn, M.; Bierbooms, W. A. A. M.; van Bussel, G. J. W.; Cockerill, T. T.; Harrison, R.; Ferguson, M. C.; Göransson, B.; Harland, L. A.; Vugts, J. H.; Wiecherink, R.

    1999-01-01

    The article reviews the main results of the recent European research project Opti-OWECS (Structural and Economic Optimisation of Bottom-Mounted Offshore Wind Energy Converters'), which has significantly improved the understanding of the requirements for a large-scale utilization of offshore wind energy. An integrated design approach was demonstrated for a 300 MW offshore wind farm at a demanding North Sea site. Several viable solutions were obtained and one was elaborated to include the design of all major components. Simultaneous structural and economic optimization took place during the different design stages. An offshore wind energy converter founded on a soft-soft monopile was tailored with respect to the distinct characteristics of dynamic wind and wave loading. The operation and maintenance behaviour of the wind farm was analysed by Monte Carlo simulations. With an optimized maintenance strategy and suitable hardware a high availability was achieved. Based upon the experience from the structural design, cost models for offshore wind farms were developed and linked to a European database of the offshore wind energy potential. This enabled the first consistent estimate of cost of offshore wind energy for entire European regions.

  12. Downscaling wind and wavefields for 21st century coastal flood hazard projections in a region of complex terrain

    Science.gov (United States)

    O'Neill, Andrea; Erikson, Li; Barnard, Patrick

    2017-01-01

    While global climate models (GCMs) provide useful projections of near-surface wind vectors into the 21st century, resolution is not sufficient enough for use in regional wave modeling. Statistically downscaled GCM projections from Multivariate Adaptive Constructed Analogues provide daily averaged near-surface winds at an appropriate spatial resolution for wave modeling within the orographically complex region of San Francisco Bay, but greater resolution in time is needed to capture the peak of storm events. Short-duration high wind speeds, on the order of hours, are usually excluded in statistically downscaled climate models and are of key importance in wave and subsequent coastal flood modeling. Here we present a temporal downscaling approach, similar to constructed analogues, for near-surface winds suitable for use in local wave models and evaluate changes in wind and wave conditions for the 21st century. Reconstructed hindcast winds (1975–2004) recreate important extreme wind values within San Francisco Bay. A computationally efficient method for simulating wave heights over long time periods was used to screen for extreme events. Wave hindcasts show resultant maximum wave heights of 2.2 m possible within the Bay. Changes in extreme over-water wind speeds suggest contrasting trends within the different regions of San Francisco Bay, but 21th century projections show little change in the overall magnitude of extreme winds and locally generated waves.

  13. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  14. Service and Maintenance - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Soederberg, David; Weisbach, Henrik (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-11-15

    This report aims to provide information of, and experiences from, service and maintenance of Lillgrund Offshore Wind Farm. The report deals with operation and maintenance (O and M) during construction, commissioning and the first three months of operation. Focus has been to describe the organization and cooperation between Vattenfall and Siemens. Experiences have been collected by interviews with representatives from Siemens and Vattenfall. The O and M strategy defined by Lillgrund's service and maintenance contract are based on a gradual take over of O and M. Siemens will be responsible for maintenance of Lillgrund during the first five years. During this five-year period, Vattenfall will build up its own maintenance organization for Lillgrund. The first three years, Vattenfall's technicians are supposed to form 30 % of the total number of maintenance technicians. The fourth and fifth year, the corresponding amount should be 50 %. During daytime, Lillgrund is operated locally. During nights and weekends, it is operated remotely by Vattenfall's operating centre in Esbjerg. The major O and M experience from Lillgrund is the need for good administrative and technical information systems. These systems should be implemented as soon as possible because of the large amounts of documentation that are created during the commissioning phase. The technical information systems must be able to present historic data of measurements in order to see trends and analyse faults

  15. The ESA Space Weather Applications Pilot Project

    Science.gov (United States)

    Glover, A.; Hilgers, A.; Daly, E.

    Following the completion in 2001 of two parallel studies to consider the feasibility of a European Space Weather Programme ESA embarked upon a space weather pilot study with the goal of prototyping European space weather services and assessing the overall market for such within Europe This pilot project centred on a number of targeted service development activities supported by a common infrastructure and making use of only existing space weather assets Each service activity included clear participation from at least one identified service user who was requested to provide initial requirements and regular feedback during the operational phase of the service These service activities are now reaching the end of their 2-year development and testing phase and are now accessible each with an element of the service in the public domain see http www esa-spaceweathet net swenet An additional crucial element of the study was the inclusion of a comprehensive and independent analysis of the benefits both economic and strategic of embarking on a programme which would include the deployment of an infrastructure with space-based elements The results of this study will be reported together with their implication for future coordinated European activities in this field

  16. Nuclear employee data system (NEDS), a pilot project

    International Nuclear Information System (INIS)

    Britz, W.L.

    1984-01-01

    This paper describes a pilot project being funded by six east coast nuclear utilities: the Nuclear Employee Data System (NEDS). The NEDS is to be a customized computer-based information management system that will receive, update, and maintain in-processing information among the NEDS participating utilities. A comprehensive set of data requirements has been preliminarily identified and characterized into areas of: personal information, security information, health physics information, respiratory protective equipment information, medical information, and training information. The NEDS is expected to become operational next summer

  17. Statistical projection effects in a hydrodynamic pilot-wave system

    Science.gov (United States)

    Sáenz, Pedro J.; Cristea-Platon, Tudor; Bush, John W. M.

    2018-03-01

    Millimetric liquid droplets can walk across the surface of a vibrating fluid bath, self-propelled through a resonant interaction with their own guiding or `pilot' wave fields. These walking droplets, or `walkers', exhibit several features previously thought to be peculiar to the microscopic, quantum realm. In particular, walkers confined to circular corrals manifest a wave-like statistical behaviour reminiscent of that of electrons in quantum corrals. Here we demonstrate that localized topological inhomogeneities in an elliptical corral may lead to resonant projection effects in the walker's statistics similar to those reported in quantum corrals. Specifically, we show that a submerged circular well may drive the walker to excite specific eigenmodes in the bath that result in drastic changes in the particle's statistical behaviour. The well tends to attract the walker, leading to a local peak in the walker's position histogram. By placing the well at one of the foci, a mode with maxima near the foci is preferentially excited, leading to a projection effect in the walker's position histogram towards the empty focus, an effect strongly reminiscent of the quantum mirage. Finally, we demonstrate that the mean pilot-wave field has the same form as the histogram describing the walker's statistics.

  18. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of... one or more phases, dependent on one or more power sale contracts. The proposed wind park would... that limit construction vehicle speed limits. Foresight indicated that the wind park contractor will...

  19. Solar wind monitor—a school geophysics project

    Science.gov (United States)

    Robinson, Ian

    2018-05-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth’s field in real-time uploading data and graphs to a website every few minutes. Modular design encourages construction and testing by teams of students as well as expansion and refinement. The system has been tested running unattended for months at a time. Both the hardware design and software is published as open-source [1, 10].

  20. The wind forecasting improvement project. Description and results from the Southern study region

    Energy Technology Data Exchange (ETDEWEB)

    Freedman, Jeffrey [AWS Truepower LLC, Albany, NY (United States); Benjamin, Stan; Wilczak, James [National Oceanic and Atmospheric Administration, Washington, DC and Boulder, CO (United States)] [and others

    2012-07-01

    The Wind Forecasting Improvement Project (WFIP) is a multi-year U.S. Department of Energy (DOE)/National Oceanographic and Atmospheric Administration (NOAA) sponsored study whose main purpose is to demonstrate the scientific and economic benefits of additional atmospheric observations and model enhancements on wind energy production forecasts. WFIP covers two geographical regions of the U.S.: (1) the upper Great Plains, or Northern Study Area, and (2) most of Texas-the Southern Study Area. The Southern campaign is being led by AWS Truepower LLC, and includes a team of private, government, and academic partners with collective experience and expertise in all facets required to ensure a successful completion of the project. In addition presenting a summary of the state-of-the-art forecasting techniques used and phenomena-based analysis mentioned above, a brief synopsis of how ''lessons learned'' from the WFIP Southern Study Area can be articulated and applied to other wind resource regions will be described. (orig.)

  1. Wind power projects and Aboriginal consultation

    Energy Technology Data Exchange (ETDEWEB)

    Isaac, T. [McCarthy Tetrault LLP, Vancouver, BC (Canada)

    2006-07-01

    This presentation outlined some of the legal aspects related to Aboriginal involvement in wind power development consultation processes and disputes. Aboriginal rights are rights held by Aboriginal people that are an element of a practice, custom, or tradition integral to the culture of groups claiming such rights. Wind power developers should understand that Aboriginal rights claims may include fishing; whaling; transportation; and cultural and spiritual activities. Aboriginal title is a subcategory of Aboriginal rights, and is a right to land itself, and an encumbrance on the Crown's underlying title to land. Weak Aboriginal claims where potential infringement by energy developers is minor may only require notice and information. Strong prima facie cases for Aboriginal rights and title where the potential for infringement is of high significance may result in more extensive consultation involving interim solutions; formal Aboriginal participation in decision-making processes; and written responses demonstrating how Aboriginal concerns have been considered. There are a number of circumstances requiring a case-by-case approach, and the Crown may make decisions in the face of Aboriginal disagreement. However, energy developers should ensure that consultation processes are fair and reasonable. Conflicting interests can often be successfully resolved through consultation, and accommodation to Aboriginal rights may include mitigation, avoiding interference, and agreeing to as little infringement as possible. Aboriginal title may attach to private land but only to the Crown's underlying title. The Crown has no duty to consult respecting Aboriginal title on private land because title has already been infringed. In these cases, duty to consult and accommodate may be discharged through other regulatory processes such as environmental impact assessments. It was concluded that wind power project proponents should build a relationship with the Crown, as avoiding

  2. A pilot project: Antioch Delta Cove, Antioch, California

    International Nuclear Information System (INIS)

    Minder, M.

    1994-01-01

    The project involves the restoration of the Hickmott cannery site, comprising approximately 15 acres (three five acre parcels) located on the Delta in inter-city Antioch. Hickmott Foods, Inc., operated a fruit and vegetable cannery between 1905 and the early 1970's, during which time tomato skins, peach and apricot pits, and asparagus butts were discharged on the site. The decaying fruit pits have caused cyanide contamination. Additionally, the site contains some petroleum hydrocarbon contamination as well as gypsum board contamination, apparently from nearby manufacturing operations. The Antioch Delta Cove Pilot shows how interested parties can work together to clean up contaminated sites and use the clean up process to stimulate technology transfer. The Antioch project is a blueprint that can be replicated at other sites across California

  3. National Land Imaging Requirements (NLIR) Pilot Project summary report: summary of moderate resolution imaging user requirements

    Science.gov (United States)

    Vadnais, Carolyn; Stensaas, Gregory

    2014-01-01

    Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only

  4. Smooth Transition for Advancement to Graduate Education (STAGE) for Underrepresented Groups in the Mathematical Sciences Pilot Project: Broadening Participation through Mentoring

    Science.gov (United States)

    Eubanks-Turner, Christina; Beaulieu, Patricia; Pal, Nabendu

    2018-01-01

    The Smooth Transition for Advancement to Graduate Education (STAGE) project was a three-year pilot project designed to mentor undergraduate students primarily from under-represented groups in the mathematical sciences. The STAGE pilot project focused on mentoring students as they transitioned from undergraduate education to either graduate school…

  5. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  6. Type IV Wind Turbine Model

    DEFF Research Database (Denmark)

    Hansen, Anca Daniela; Margaris, Ioannis D.

    . In the project, this wind turbine model will be further incorporated in a wind power plant model together with the implementation in the wind power control level of the new control functionalities (inertial response, synchronising power and power system damping). For this purpose an aggregate wind power plant......This document is created as part of the EaseWind project. The goal of this project is to develop and investigate new control features for primary response provided by wind power plants. New control features as inertial response, synchronising power and power system damping are of interest to EaseWind...... project to be incorporated in the wind power plant level. This document describes the Type 4 wind turbine simulation model, implemented in the EaseWind project. The implemented wind turbine model is one of the initial necessary steps toward integrating new control services in the wind power plant level...

  7. Pilot Implementations

    DEFF Research Database (Denmark)

    Manikas, Maria Ie

    by conducting a literature review. The concept of pilot implementation, although commonly used in practice, is rather disregarded in research. In the literature, pilot implementations are mainly treated as secondary to the learning outcomes and are presented as merely a means to acquire knowledge about a given...... objective. The prevalent understanding is that pilot implementations are an ISD technique that extends prototyping from the lab and into test during real use. Another perception is that pilot implementations are a project multiple of co-existing enactments of the pilot implementation. From this perspective......This PhD dissertation engages in the study of pilot (system) implementation. In the field of information systems, pilot implementations are commissioned as a way to learn from real use of a pilot system with real data, by real users during an information systems development (ISD) project and before...

  8. Characteristics of Wind Power Projects in Mountainous Area and Techniques for Wind Turbine Installation%山区风电工程特点与风机吊装技术

    Institute of Scientific and Technical Information of China (English)

    张栋

    2014-01-01

    In recent years , mountains for domestic wind power development become higher , which also make the instal-lation of wind turbines a more difficult work .For wind power projects , it is now a major issue to complete the installation of wind turbines safely and efficiently on schedule .In this paper , practical experience from the second stage Luotuogou project in Hebei province is summarized .Characteristics of wind power projects in mountainous area and techniques for wind turbine installation are analyzed , which provide useful references to other wind turbine installation work in moun-tainous area .%近年来国内山区风电工程中山越来越高,风机安装难度越来越大,如何在紧张的工期下安全高效的完成风机安装,是每个风电施工企业面临的主要课题。以河北坝上骆驼沟二期风电场为例,对山区风电工程特点和风机吊装技术进行总结分析,以期对更多山区风机安装提供借鉴。

  9. Wind of opportunity

    International Nuclear Information System (INIS)

    Jamieson, Peter

    1999-01-01

    This article traces the move towards the offshore exploitation of wind energy in Europe, and presents information on existing offshore wind energy projects and proposed wind turbine prototypes for offshore operation. The building of the first major offshore wind project at Vindeby, the use of rock socketed monopile foundations for pile drilling and erection of the wind turbines from a mobile jack-up barge, the costs of wind turbines, the fatigue loads on the support structures due to the wind loading, and the offshore wind market in the UK and Europe are discussed. (UK)

  10. The 12-foot pressure wind tunnel restoration project model support systems

    Science.gov (United States)

    Sasaki, Glen E.

    1992-01-01

    The 12 Foot Pressure Wind Tunnel is a variable density, low turbulence wind tunnel that operates at subsonic speeds, and up to six atmospheres total pressure. The restoration of this facility is of critical importance to the future of the U.S. aerospace industry. As part of this project, several state of the art model support systems are furnished to provide an optimal balance between aerodynamic and operational efficiency parameters. Two model support systems, the Rear Strut Model Support, and the High Angle of Attack Model Support are discussed. This paper covers design parameters, constraints, development, description, and component selection.

  11. The North Sea offshore wind park network and the role of SMEs in project benefit management across actors

    DEFF Research Database (Denmark)

    Brink, Tove

    routes for SMEs to enhance Project Benefit Management. It is especially difficult to move to the partner-driven approach. Here the intermediary roles of either demand-driven or supplier-driven SME approach are needed before the partner-driven approach is likely to be achieved. A contribution is hereby......The research in this paper reveals how Small and Medium-sized Enterprises (SMEs) can contribute to project benefit management for offshore wind energy to be competitive. The research is based on a longitudinal qualitative study starting in 2011 with 10 SME wind park suppliers. The research...... continued with a focus group interview and individual interviews with 20 larger enterprises and SMEs within operation and maintenance in wind parks with follow up in a seminar May 2015. The findings reveal opportunities and challenges for SMEs to contribute to project benefit management in wind parks. Four...

  12. Wind energy planning in England, Wales and Denmark: Factors influencing project success

    International Nuclear Information System (INIS)

    McLaren Loring, Joyce

    2007-01-01

    Land-use planning poses a significant barrier to the further development of on-shore wind energy in many countries. There has been increasing discussion regarding the use of public participation in the planning process in order to address concerns of local residents and ease conflicts. This research explores the dynamics of the planning process for wind energy in England, Wales and Denmark in order to better understand the factors influencing project success. Through 18 in-depth case studies, it investigates the degree of local community participation in the planning process and the stability of the network of individuals and organisations involved in the project to determine their relationship to the public's acceptance of the project and the planning outcome. The study draws on the frameworks of public participation in planning and actor-network theories in order to develop indicators of the level of community involvement and network formation for each case. The analysis discusses predictions made by the theoretical approaches as to the importance of these variables to the success of new projects. The results indicate that projects with high levels of participatory planning are more likely to be publicly accepted and successful. In addition, stable supporting networks are more likely to form. The presence of a stable network of supporters is not found to be related to project acceptance and success; however, the absence of a stable network of opponents is found to be necessary for project acceptance and success in receiving planning permission

  13. Offshore wind resource estimation for wind energy

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Badger, Merete; Mouche, A.

    2010-01-01

    Satellite remote sensing from active and passive microwave instruments is used to estimate the offshore wind resource in the Northern European Seas in the EU-Norsewind project. The satellite data include 8 years of Envisat ASAR, 10 years of QuikSCAT, and 23 years of SSM/I. The satellite observati......Satellite remote sensing from active and passive microwave instruments is used to estimate the offshore wind resource in the Northern European Seas in the EU-Norsewind project. The satellite data include 8 years of Envisat ASAR, 10 years of QuikSCAT, and 23 years of SSM/I. The satellite...... observations are compared to selected offshore meteorological masts in the Baltic Sea and North Sea. The overall aim of the Norsewind project is a state-of-the-art wind atlas at 100 m height. The satellite winds are all valid at 10 m above sea level. Extrapolation to higher heights is a challenge. Mesoscale...... modeling of the winds at hub height will be compared to data from wind lidars observing at 100 m above sea level. Plans are also to compare mesoscale model results and satellite-based estimates of the offshore wind resource....

  14. Pilot Weather Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Aviation weather reports relayed from pilots to FAA air traffic controllers or National Weather Service personnel. Elements include sky cover, turbulence, wind...

  15. Convergent and divergent learning in photovoltaic pilot projects and subsequent niche development

    NARCIS (Netherlands)

    Mierlo, van B.

    2012-01-01

    A proposed strategy to facilitate the use and development of radical new sustainable technologies is the creation of niches. Learning in these niches and the social embedding of learning experiences can stimulate changes in existing sociotechnological regimes. Pilot projects in which new

  16. 75 FR 49517 - Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project...

    Science.gov (United States)

    2010-08-13

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project, Lake and...: You may submit comments related to the Walker Ridge Wind Project by any of the following methods: Web... CONTACT: For further information and/or to have your name added to our mailing list, contact Bethney...

  17. Vertical wind velocity measurements using a five-hole probe with remotely piloted aircraft to study aerosol-cloud interactions

    Science.gov (United States)

    Calmer, Radiance; Roberts, Gregory C.; Preissler, Jana; Sanchez, Kevin J.; Derrien, Solène; O'Dowd, Colin

    2018-05-01

    The importance of vertical wind velocities (in particular positive vertical wind velocities or updrafts) in atmospheric science has motivated the need to deploy multi-hole probes developed for manned aircraft in small remotely piloted aircraft (RPA). In atmospheric research, lightweight RPAs ( power spectral density (PSD) functions and turbulent kinetic energy (TKE) derived from the five-hole probe are compared with sonic anemometers on a meteorological mast. During a BACCHUS field campaign at Mace Head Atmospheric Research Station (Ireland), a fleet of RPAs was deployed to profile the atmosphere and complement ground-based and satellite observations of physical and chemical properties of aerosols, clouds, and meteorological state parameters. The five-hole probe was flown on straight-and-level legs to measure vertical wind velocities within clouds. The vertical velocity measurements from the RPA are validated with vertical velocities derived from a ground-based cloud radar by showing that both measurements yield model-simulated cloud droplet number concentrations within 10 %. The updraft velocity distributions illustrate distinct relationships between vertical cloud fields in different meteorological conditions.

  18. Yukon's green power initiative and support for wind

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, D. [Yukon Development Corp., Whitehorse, YK (Canada)

    2002-07-01

    Yukon's green power initiative is aimed at increasing the production and sale of small-scale renewable energy to meet the requirements of communities and industry while reducing greenhouse gas emissions. The territorial government has created a 10 year, $5 million investment fund including wind research and development. The objective is to replace diesel production and reduce emissions, provide consumers with green power options and improve the cost-effectiveness and long-term competitiveness. Targeted measures led by the Yukon Energy Corporation include: a commercial scale wind installation at Haeckel Hill near Whitehorse; a community wind resource assessment program; pilot and demonstration projects; technical capacity building; and, joint ventures with Yukon First Nations. The utility is providing leadership by allowing access to electricity markets through the generation of franchises and by providing flexible financing through corporate investment led by Yukon Development Corporation. 1 fig.

  19. Developing Collections With Get It Now: A Pilot Project for a Hybrid Collection.

    Science.gov (United States)

    Hendler, Gail Y; Gudenas, Jean

    2016-01-01

    As health sciences libraries transition from print to online journal collections that require significant institutional funding, librarians are investigating the use of on demand services in order to meet customer need and contain costs. In 2014 a three-year pilot project to determine if unmediated access to the Copyright Clearance Center's Get It Now service would expand access to needed content and provide usage data to inform collections decision making. The service provides rapid, automated delivery of unsubscribed, high-quality journal articles directly to the customer. The three-year pilot project aims to compare the cost of Get It Now to the traditional subscription model to learn if the service is a cost-effective and sustainable alternative that improves customer satisfaction and that can transform collection development with a hybrid model for journal acquisitions.

  20. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and sustainability analysis

    International Nuclear Information System (INIS)

    Ringius, L.; Grohnheit, P.E.; Nielsen, L.H.; Olivier, A.L.; Painuly, J.; Villavicencio, A.

    2002-12-01

    The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment and development - that is, baseline development, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends methodologies for and approaches to baseline development. To present the application and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana, Egypt- is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between the lowest (0.5496 tCO2/MWh) and the highest emission rate (0.6868 tCO 2 /MWh) estimated in accordance with these three standardized approaches to baseline development according to the Marrakesh Accord. This difference in emission factors comes about partly as a result of including hydroelectric power in the baseline scenario. Hydroelectric resources constitute around 21% of the generation capacity in Egypt, and, if excluding hydropower, the difference between the lowest and the highest baseline is reduced to 18%. Furthermore, since the two variations of the 'historical' baseline option examined result in the highest and the lowest baselines, by disregarding this baseline option altogether the difference between the lowest and the highest is reduced to 16%. The ES3-model, which the Systems Analysis Department at Risoe National Laboratory has developed, makes it possible for this report to explore the project-specific approach to baseline development in some detail. Based on quite disaggregated data on the Egyptian electricity system, including the wind power production

  1. Holistic assessment of a landfill mining pilot project in Austria: Methodology and application.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Wolfsberger, Tanja; Ragossnig, Arne; Pomberger, Roland

    2016-07-01

    Basic technical and economic examinations of Austrian mass waste landfills, concerning the recovery of secondary raw materials, have been carried out by the 'LAMIS - Landfill Mining Austria' pilot project for the first time in Austria. A main focus of the research - the subject of this article - was the first devotion of a pilot landfill to an integrated ecological and economic assessment so that its feasibility could be verified before a landfill mining project commenced. A Styrian mass waste landfill had been chosen for this purpose that had been put into operation in 1979 and received mechanically-biologically pre-treated municipal waste till 2012. The whole assessment procedure was divided into preliminary and main assessment phases to evaluate the general suitability of a landfill mining project with little financial and human resource expense. A portfolio chart, based on a questionnaire, was created for the preliminary assessment that, as a result, has provided a recommendation for subsequent investigation - the main assessment phase. In this case, specific economic criteria were assessed by net present value calculation, while ecological or socio-economic criteria were rated by utility analysis, transferring the result into a utility-net present value chart. In the case of the examined pilot landfill, assessing the landfill mining project produced a higher utility but a lower net present value than a landfill leaving-in for aftercare. Since no clearly preferable scenario could be identified this way, a cost-revenue analysis was carried out in addition that determined a dimensionless ratio: the 'utility - net present value quotient' of both scenarios. Comparing this quotient showed unmistakably that in the overall assessment, 'leaving the landfill in aftercare' was preferable to a 'landfill mining project' in that specific case. © The Author(s) 2016.

  2. "No queremos vender oxígeno" : the implementation of a REDD pilot project in the Bolivian Amazon

    OpenAIRE

    Bardalen, Ingunn

    2011-01-01

    Based on a six month fieldwork in an indigenous community in an indigenous territory, TCO, this thesis explore the initial stages of the implementation of a REDD pilot project in the northern Bolivian amazon. Since the establishment of the indigenous territory, there has been increasing pressure from logging companies and illegal logging, which has caused forest degradation in these areas. The REDD pilot project seek to reduce forest degradation in this area, and through monitoring this reduc...

  3. Fermeuse wind power project Newfoundland : noise and visual analysis studies

    Energy Technology Data Exchange (ETDEWEB)

    Henn, P.; Turgeon, J.; Heraud, P.; Belanger, S.; Dakousian, S.; Lamontagne, C.; Soares, D. [Helimax Energy Inc., Montreal, PQ (Canada); Basil, C.; Boulianne, S.; Salacup, S.; Thompson, C. [Skypower, Toronto, ON (Canada)

    2008-03-15

    This paper discussed the noise and visual analyses used to assess the potential impacts of a wind energy project on the east coast of the Avalon Peninsula near St. John's, Newfoundland. The proposed farm will be located approximately 1 km away from the town of Fermeuse, and will have an installed capacity of 27 MW from 9 turbines. The paper provided details of the consultation process conducted to determine acceptable distance and site locations for the wind turbines from the community. Stakeholders were identified during meetings, events, and discussions with local authorities. Consultations were also held with government agencies and municipal councils. A baseline acoustic environment study was conducted, and details of anticipated environmental impacts during the project's construction, operation, and decommissioning phases were presented. The visual analysis study was divided into the following landscape units: town, shoreline, forest, open land and lacustrine landscapes. The effect of the turbines on the landscapes were assessed from different viewpoints using visual simulation programs. The study showed that the visual effects of the project are not considered as significant because of the low number of turbines. It was concluded that the effect of construction on ambient noise levels is of low concern as all permanent dwellings are located at least 1 km away from the turbines. 2 refs., 4 tabs., 4 figs.

  4. The World Center for Computing's Pilot Videodisc Project for French Language Instruction.

    Science.gov (United States)

    Eastmond, J. Nicholls, Jr.; Mosenthal, Richard

    1985-01-01

    Describes a pilot videodisc project for French language instruction. Unique features include (1) learner control of instruction by a mouse or touch-sensitive screen, (2) extensive cultural interaction, and (3) an elaborate lexicon of word meanings portrayed visually for selected key words. (Author/SED)

  5. Examining the financial performance of micro-generation wind projects and the subsidy effect of feed-in tariffs for urban locations in the United Kingdom

    International Nuclear Information System (INIS)

    Walters, Ryan; Walsh, Philip R.

    2011-01-01

    This paper seeks to evaluate the effect of the upcoming 2010 UK Feed-in Tariff (UK FIT) on decentralised small wind-energy installations at the household and building level in urban locations. It is projected that the UK FIT will stimulate an unprecedented surge in building-mounted turbine installation. The tariff amount must stimulate incentive but mitigate the likelihood of distortions in the competitive electricity market. To analyse these issues, measured energy output from sites in the Warwick Wind Trials Project (WWTP) is converted into revenue in a net-present-value (NPV) framework for assessing commercial purchases of small wind systems. Variances in project variables are examined through NPV simulations using Monte Carlo analysis to capture permutations of small wind-project performance in the UK-with and without the UK FIT. Our research concludes that the proposed tariff amount of 30.5 p/kWh will not significantly boost the economic attractiveness of mildly selective (WWTP-based) sites in the UK. Furthermore, the fixed-tariff rate ( Pounds /kWh generated) could cause inefficiencies applied across uneven wind-resource distribution. The results of this study suggest further examination of policy related to micro-generation, in particular decentralised small wind projects. - Highlights: → Feed-in tariff (FIT) policy for urban UK small wind projects. → Determination of economic attractiveness (NPV) of projects. → Application of performance data from Warwick Wind Trials. → Need for higher tariff rate to provide average project with NPV>0. → Recommend reconsideration of FIT policy for urban small wind projects.

  6. Comparing avian and bat fatality rate estimates among North American wind energy projects

    Energy Technology Data Exchange (ETDEWEB)

    Smallwood, Shawn

    2011-07-01

    Full text: Wind energy development has expanded rapidly, and so have concerns over bird and bat impacts caused by wind turbines. To assess and compare impacts due to collisions, investigators use a common metric, fatalities/MW/year, but estimates of fatality rates have come from various wind turbine models, tower heights, environments, fatality search methods, and analytical methods. To improve comparability and asses large-scale impacts, I applied a common set of assumptions and methods to data in fatality monitoring reports to estimate fatality rates of birds and bats at 71 wind projects across North America (52 outside the Altamont Pass Wind Resource Area, APWRA). The data were from wind turbines of 27 sizes (range 0.04-3.00 MW) and 28 tower heights (range 18.5-90 m), and searched at 40 periodic intervals (range 1-90 days) and out to 20 distances from turbines (range 30-126 m). Estimates spanned the years 1982 to 2010, and involved 1-1,345 turbines per unique combination of project, turbine size, tower height, and search methodology. I adjusted fatality rates for search detection rates averaged from 425 detection trials, and for scavenger removal rates based on 413 removal trials. I also adjusted fatality rates for turbine tower height and maximum search radius, based on logistic functions fit to cumulative counts of carcasses that were detected at 1-m distance intervals from the turbine. For each tower height, I estimated the distance at which cumulative carcass counts reached an asymptote, and for each project I calculated the proportion of fatalities likely not found due to the maximum search radius being short of the model-predicted distance asymptote. I used the same estimator in all cases. I estimated mean fatalities/MW/year among North American wind projects at 12.6 bats (80% CI: 8.1-17.1) and 11.1 birds (80% CI: 9.5-12.7), including 1.6 raptors (80% CI: 1.3-2.0), and excluding the Altamont Pass I estimated fatality rates at 17.2 bats (80% CI: 9

  7. Industrial wind. Strategic Road-map

    International Nuclear Information System (INIS)

    Therond, Pierre-Guy; Le Tirant, Alain; Vergnet, Marc; Hita-Perona, Sebastien; Bonnefond, Thierry; Guignard, Jean-Philippe; Roudil, Jean-Philippe; Villageois, Jean-Remy; Meyronneinc, Jean-Paul; Hua, Xavier; Herlaut, Fabienne; Maurel, Olivier; Boulnois, Renald; Lapeyre, Dominique; Mairet, Franck; Bongrain, Marie-Pierre; Kariniotakis, Georges; Rapin, Marc

    2012-06-01

    Since 2010, the ADEME has been managing four programmes within the scope of 'Future Investments'. Groups of research experts from various industrial fields, research bodies and research programming and financing agencies are responsible, within the scope of collective works, for producing strategic road-maps. These are used to launch Calls for Expressions of Interest (CEI). With regard to wind energy, the purpose of this road-map is to: - Highlight the industrial, technological, environmental and societal challenges encountered in the development of 'Industrial Wind'; - Draw up middle and long-term coherent, shared visions of the socio-technical systems or technologies in question; - Identify the technological, organisational, environmental and socio-economic obstacles, and therefore initiate (or pursue) the development of high-performance and economically viable technologies; - Promote the research, development and demonstration requirements ('technological demonstrators' to validate innovative technological solutions), experimentation requirements and technology platforms to be deployed ('pilot' projects to be tested under real circumstances: 'pre-commercial' unit prototypes then 'pre-commercial pilot farms') to improve the competitiveness of offers and companies within this sector, to reach the ambitious objectives set within the framework of the Grenelle Environnement and to promote and support the development of a French wind energy industry. These needs can then act as a basis for: - drawing up CEIs; - programming research within the ADEME and other institutions such as the Agence nationale de la recherche (ANR - French National Research Agency), the Comite strategique national sur la recherche energie (French national strategic committee for energy research) and the Alliance nationale de coordination de la recherche pour l'energie (ANCRE - French national alliance for the coordination of energy research). These research and experimentation priorities

  8. Macroalgae for CO2 Capture and Renewable Energy - A Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Wiley, Kristine [Gas Technology Inst., Des Plaines, IL (United States)

    2011-01-31

    The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO2) through a technology designed to capture CO2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO2/ NOx flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing

  9. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  10. WindScanner.eu - a new Remote Sensing Research Infrastructure for On- and Offshore Wind Energy

    DEFF Research Database (Denmark)

    Mikkelsen, Torben; Siggaard Knudsen, Søren; Sjöholm, Mikael

    2012-01-01

    will be disseminated throughout Europe to pilot European wind energy research centers. The new research infrastructure will become an open source infrastructure that also invites collaboration with wind energy related atmospheric scientists and wind energy industry overseas. Recent achievements with 3D Wind......A new remote sensing based research infrastructure for atmospheric boundary-layer wind and turbulence measurements named WindScanner have during the past three years been in its early phase of development at DTU Wind Energy in Denmark. During the forthcoming three years the technology......Scanners and spin-off innovation activity are described. The Danish WindScanner.dk research facility is build from new and fast-scanning remote sensing equipment spurred from achievements within fiber optics and telecommunication technologies. At the same time the wind energy society has demanded excessive 3D wind...

  11. [Exercise-referral to a specialist in adapted physical activity (APA) : a pilot project].

    Science.gov (United States)

    Brugnerotto, Adeline; Cardinaux, Regula; Ueltschi, Yan; Bauwens, Marine; Nanchen, David; Cornuz, Jacques; Bize, Raphaël; Auer, Reto

    2016-11-02

    Family physicians have a key role in the promotion of physical activity, in particular in identifying and counseling persons who have a sedentary lifestyle. Some patients could benefit from intensive individual counseling. Physicians are often not aware of all physical activity promotion activities in the community that they could recommend their patients. In a pilot study, we have tested and adapted the referral of patients from family physicians to specialists in adapted physical activity (APAs). APAs are trained to assess and guide persons towards physical activities adapted to their needs and pathologies and thus towards an increase in physical activity. Pilot data suggest that, while few patients were oriented to the APAs in the pilot project, family physicians appreciate the possibility of collaborating with the APAs.

  12. Wind Farm Wake

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Karagali, Ioanna; Volker, Patrick

    2017-01-01

    On 25 January 2016 at 12:45 UTC several photographs of the offshore wind farm Horns Rev 2 were taken by helicopter pilot Gitte Lundorff with an iPhone. A very shallow layer of fog covered the sea. The photos of the fog over the sea dramatically pictured the offshore wind farm wake. Researchers got...... together to investigate the atmospheric conditions at the time of the photos by analysing local meteorological observations and wind turbine information, satellite remote sensing and nearby radiosonde data. Two wake models and one mesoscale model were used to model the case and explain what was seen....

  13. The Recon Pilot Project: A Progress Report, October 1970-May 1971

    Directory of Open Access Journals (Sweden)

    Henriette D. Avram

    1971-09-01

    Full Text Available Synopsis of three progress reports on the RECON Pilot Project submitted by the Library of Congress to the Council on Library Resources covering the period October 1970-May 1971. Progress is reported in the following areas: RECON production, foreign language editing test, format recognition, microfilming, input devices, and tasks assigned to the RECON Working Task Force.

  14. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  15. The LEONARDO-DA-VINCI pilot project "e-learning-assistant" - Situation-based learning in nursing education.

    Science.gov (United States)

    Pfefferle, Petra Ina; Van den Stock, Etienne; Nauerth, Annette

    2010-07-01

    E-learning will play an important role in the training portfolio of students in higher and vocational education. Within the LEONARDO-DA-VINCI action programme transnational pilot projects were funded by the European Union, which aimed to improve the usage and quality of e-learning tools in education and professional training. The overall aim of the LEONARDO-DA-VINCI pilot project "e-learning-assistant" was to create new didactical and technical e-learning tools for Europe-wide use in nursing education. Based on a new situation-oriented learning approach, nursing teachers enrolled in the project were instructed to adapt, develop and implement e- and blended learning units. According to the training contents nursing modules were developed by teachers from partner institutions, implemented in the project centers and evaluated by students. The user-package "e-learning-assistant" as a product of the project includes two teacher training units, the authoring tool "synapse" to create situation-based e-learning units, a student's learning platform containing blended learning modules in nursing and an open sourced web-based communication centre. Copyright 2009 Elsevier Ltd. All rights reserved.

  16. Wind power development field test project at Ashibe-cho. Detailed wind characteristics survey; Ashibecho ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Ashibe-cho, Iki-gun, Nagasaki Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 5.8m/s and the maximum wind speed in the period was 35m/s. Winds came from the prevailing direction of NE (21.3%), and then from NNE (14.7%) and ENE (7.9%). The wind axis was in the NE-SW direction, and the total wind direction occurrence rate from the 6 directions was 60.2%. Turbulence intensity was 0.19 at wind speed 2.0m/s or more and 0.17 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 66-84% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  17. National conversion pilot project: A creative approach to recyling

    International Nuclear Information System (INIS)

    Gandee, K.R.; Taylor, R.A.; Cornils, K.N.

    1995-01-01

    As a result of the Bush-Yeltsin summit in 1991, the U.S. Department of Energy (DOE) has undergone a significant downsizing of its defense mission. In July 1992, the Rocky Flats site in Colorado was the first DOE site to be closed. Its mission was changed from defense to environmental cleanup and economic development. Recognizing the need to assist displaced workers and affected communities and to conduct cost-effective cleanup of DOE sites, Congress initiated two legislative provisions in the 1994 National Defense Authorization Act that required DOE to (a) provide local impact assistance to communities that are affected by the defense downsizing and (b) conduct at least One waste recycling project within the 1994 fiscal year. At the Rocky Flats site, the National Conversion Pilot Project represents an innovative approach in which both Congressional requirements are achieved simultaneously, and the strategy for meeting these requirements was developed through the active participation of all stakeholders of the project

  18. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  19. IEA Wind Task 26: Offshore Wind Farm Baseline Documentation

    Energy Technology Data Exchange (ETDEWEB)

    Smart, Gavin [Offshore Renewable Energy Catapult, Blyth, Northumberland (United Kingdom); Smith, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Warner, Ethan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sperstad, Iver Bakken [SINTEF Energy Research, Trondheim (Norway); Prinsen, Bob [Ecofys, Utrecht (Netherlands). TKI Wind Op Zee; Lacal-Arantegui, Roberto [European Commission Joint Research Centre (JRC), Brussels (Belgium)

    2016-06-02

    This document has been produced to provide the definition and rationale for the Baseline Offshore Wind Farm established within IEA Wind Task 26--Cost of Wind Energy. The Baseline has been developed to provide a common starting point for country comparisons and sensitivity analysis on key offshore wind cost and value drivers. The baseline project reflects an approximate average of the characteristics of projects installed between 2012 and 2014, with the project life assumed to be 20 years. The baseline wind farm is located 40 kilometres (km) from construction and operations and maintenance (O&M) ports and from export cable landfall. The wind farm consists of 100 4-megawatt (MW) wind turbines mounted on monopile foundations in an average water depth of 25 metres (m), connected by 33-kilovolt (kV) inter-array cables. The arrays are connected to a single offshore substation (33kV/220kV) mounted on a jacket foundation, with the substation connected via a single 220kV export cable to an onshore substation, 10km from landfall. The wind farm employs a port-based O&M strategy using crew-transfer vessels.

  20. Pilot Test of the Online Public Access Catalog Project's User and Nonuser Questionnaires. Final Report.

    Science.gov (United States)

    Markey, Karen

    This report describes the pilot data collections and post-questionnaire interview activities of the Council on Library Resources (CLR)/Online Computer Library Center (OCLC) Online Public Access Project. The background of the project is briefly described, the purpose and adminstration of the post-questionnaire interviews are outlined, and pilot…

  1. Investigation of the potential of wind energy applications in the Sct. Petersburg region. Pre-feasibility study report. Phase 1

    International Nuclear Information System (INIS)

    1995-11-01

    It was proposed to initiate an investigation and, if found to be viable, a feasibility study of the possibilities for partly substituting and supplementing the existing nuclear and fossil fuel based energy supply of the St. Petersburg region with environmentally benign wind energy. The feasibility study is expected to lead to one or more pilot projects. The proposal outlines a three-phased project including an investigation, a feasibility study and a full scale demonstration of wind energy in this region. A 4th phase is envisaged, and this will include the large scale introduction of wind energy applications using national and international financing and resulting in increased local production. The report covers the first phase, the investigation which includes data acquisition and desk studies. It is shown that technically exploitable wind potential exists in the St. Petersburg region, that local production of wind turbine equipment will reduce wind turbine costs due to decreased transport costs and lower local salaries, that suitable sites for the demonstration of both grid-connected wind farms and wind-diesel systems have been preliminarily identified and that the demonstration plants investigated have exhibited reasonable economic parameters - IRR in the range of 9 - 15%. But a feasibility study phase (2) including engineering and economic analyses must be carried out in order to reach the necessary detailed understanding of the technical and economic implications of full scale demonstration projects. (EG)

  2. Hywind floating wind turbine project

    Energy Technology Data Exchange (ETDEWEB)

    Crome, Tim

    2010-07-01

    The Hywind floating wind turbine concept was developed by StatoilHydro. Technip was awarded the contract for engineering, fabrication and installation of a demonstration unit in May 2008 and the completed wind turbine was installed mid June 2009 at the west coast of Norway on 220 m water depth. The demonstration unit will generate 2,3 MW and is equipped with instrumentation for monitoring mooring forces, strains and motions. The fabrication of the SPAR type steel substructure was performed at Technip Offshore Finland facilities in Pori and was towed horizontally from Finland to Norway, where it was upended to a vertical position by water filling. The completed floating wind turbine was towed vertically to the final location west of Karmoey and connected to the pre-installed three legged anchor system using an Anchor Handling Tug type vessel. The wind turbine test period is scheduled to start in September 2009. Statoil will monitor the performance of the system for two years before decision will be taken for further development. The paper will present the main challenges and lessons learned through design, fabrication and installation of this first of its kind structure. Main emphasis will be on the special challenges experienced for this floating, catenary moored, slender unit which is highly exposed for wind induced forces in addition to current and waves in hostile North Sea environments. (Author)

  3. 2010 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Ryan Wiser, Mark Bolinger

    2011-06-01

    This report provides a comprehensive overview of trends in the U.S. wind power market in 2010. The report analyzes trends in wind power capacity, industry, manufacturing, turbines, installed project costs, project performance, and wind power prices. It also describes trends among wind power developers, project owners, and power purchasers, and discusses financing issues.

  4. The Fermilab ISDN Pilot Project: Experiences and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  5. The Fermilab ISDN Pilot Project: Experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking

  6. The Fermilab ISDN pilot project: experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1996-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. each home was equipped with a basic rate ISDN (BRI) Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking. (author)

  7. Statistics on Science and Technology in Latin America, Experience with UNESCO Pilot Projects, 1972-1974.

    Science.gov (United States)

    Thebaud, Schiller

    This report examines four UNESCO pilot projects undertaken in 1972 in Brazil, Colombia, Peru, and Uruguay to study the methods used for national statistical surveys of science and technology. The projects specifically addressed the problems of comparing statistics gathered by different methods in different countries. Surveys carried out in Latin…

  8. EERA-DTOC Project: Design Tools for Offshore Wind Farm Clusters; Proyecto EERA-DTOC: herramientas para el diseno de clusters de Parques Eolicos Marinos

    Energy Technology Data Exchange (ETDEWEB)

    Palomares, A. M.

    2015-07-01

    In the EERA-DTOC Project an integrated and validated software design tool for the optimization of offshore wind farms and wind farm clusters has been developed. The CIEMAT contribution to this project has change the view on mesoscale wind forecasting models, which were not so far considered capable of modeling wind farm scale phenomena. It has been shown the ability of the WRF model to simulate the wakes caused by the wind turbines on the downwind ones (inter-turbine wakes within a wind farm) as well as the wakes between wind farms within a cluster. (Author)

  9. Overview of NASA's Carbon Monitoring System Flux-Pilot Project

    Science.gov (United States)

    Pawson, Steven; Gunson, Michael R.; Jucks, Kenneth

    2011-01-01

    NASA's space-based observations of physical, chemical and biological parameters in the Earth System along with state-of-the-art modeling capabilities provide unique capabilities for analyses of the carbon cycle. The Carbon Monitoring System is developing an exploratory framework for detecting carbon in the environment and its changes, with a view towards contributing to national and international monitoring activities. The Flux-Pilot Project aims to provide a unified view of land-atmosphere and ocean-atmosphere carbon exchange, using observation-constrained models. Central to the project is the application of NASA's satellite observations (especially MODIS), the ACOS retrievals of the JAXA-GOSAT observations, and the "MERRA" meteorological reanalysis produced with GEOS-S. With a primary objective of estimating uncertainty in computed fluxes, two land- and two ocean-systems are run for 2009-2010 and compared with existing flux estimates. An transport model is used to evaluate simulated CO2 concentrations with in-situ and space-based observations, in order to assess the realism of the fluxes and how uncertainties in fluxes propagate into atmospheric concentrations that can be more readily evaluated. Finally, the atmospheric partial CO2 columns observed from space are inverted to give new estimates of surface fluxes, which are evaluated using the bottom-up estimates and independent datasets. The focus of this presentation will be on the science goals and current achievements of the pilot project, with emphasis on how policy-relevant questions help focus the scientific direction. Examples include the issue of what spatio-temporal resolution of fluxes can be detected from polar-orbiting satellites and whether it is possible to use space-based observations to separate contributions to atmospheric concentrations of (say) fossil-fuel and biological activity

  10. Insights from stakeholders of five residential smart grid pilot projects in the Netherlands

    NARCIS (Netherlands)

    Obinna, U.; Joore, P.; Wauben, L.; Reinders, Angelina H.M.E.

    2016-01-01

    This paper presents insights and perceptions of stakeholders involved in the development and implementation of residential smart grid pilot projects in the Netherlands, adding to the limited information that is currently available in this area, while expectations about the potential benefits of

  11. Lower Sioux Wind Feasibility & Development

    Energy Technology Data Exchange (ETDEWEB)

    Minkel, Darin

    2012-04-01

    This report describes the process and findings of a Wind Energy Feasibility Study (Study) conducted by the Lower Sioux Indian Community (Community). The Community is evaluating the development of a wind energy project located on tribal land. The project scope was to analyze the critical issues in determining advantages and disadvantages of wind development within the Community. This analysis addresses both of the Community's wind energy development objectives: the single turbine project and the Commerical-scale multiple turbine project. The main tasks of the feasibility study are: land use and contraint analysis; wind resource evaluation; utility interconnection analysis; and project structure and economics.

  12. PROJECT MANAGEMENT MATURITY: AN ASSESSMENT OF MATURITY FOR DEVELOPING PILOT PLANTS

    Directory of Open Access Journals (Sweden)

    H.K. Mittermaier

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Despite the current economic climate, the South African mining and engineering industry is experiencing a very promising future, with a large number of capital projects in the offing. It is inevitable that pilot plant development will form part of this future as a risk mitigation technique. This study found that, even though the terms ‘pilot plant’ and ‘project management maturity’ are familiar within the industry, no link between these two could be found in the literature. A number of maturity models exist; and one developed by PMSolutions was selected to perform an assessment of the current level of project management maturity within the South African mining and engineering industry pertaining to the development of pilot plants. The Delphi technique was used to determine the views of experts in the South African mining, mineral processing, petrochemical, nuclear, and mechanical sectors regarding this maturity. A significant difference was observed between the current level of maturity and the required level of maturity in all but one of the nine knowledge areas defined by the Project Management Institute. The two knowledge areas of project time and risk management showed significant differences between current and required maturity levels, and were identified as key areas for improvement.

    AFRIKAANSE OPSOMMING: Ten spyte van die huidige ekonomiese klimaat ondervind die Suid-Afrikaanse mynbou- en ingenieursbedryf ’n baie bemoedigende toekoms, met ’n groot aantal kapitaalprojekte in die vooruitsig. Ten einde risiko’s te verlaag, sal die ontwikkeling van loodsaanlegte noodwendig deel van hierdie toekoms uitmaak. Daar is gevind dat, alhoewel die terme ‘loodsaanleg’ en ‘projekbestuur volwassenheid’ in die nywerheid bekend is, geen skakeling van hierdie twee terme in die literatuur opgespoor kon word nie. ’n Aantal volwassenheid modelle bestaan; en een wat deur PMSolutions ontwikkel is, is gekies om

  13. Pilot research projects for underground disposal of radioactive wastes in the United States of America

    International Nuclear Information System (INIS)

    Stein, R.; Collyer, P.L.

    1984-01-01

    Disposal of commercial radioactive waste in the United States of America in a deep underground formation will ensure permanent isolation from the biosphere with minimal post-closure surveillance and maintenance. The siting, design and development, performance assessment, operation, licensing, certification and decommissioning of an underground repository have stimulated the development of several pilot research projects throughout the country. These pilot tests and projects, along with their resulting data base, are viewed as important steps in the overall location and construction of a repository. Beginning in the 1960s, research at pilot facilities has progressed from underground spent fuel tests in an abandoned salt mine to the production of vitrified nuclear waste in complex borosilicate glass logs. Simulated underground repository experiments have been performed in the dense basalts of Washington State, the volcanic tuffaceous rock of Nevada and both domal and bedded salts of Louisiana and Kansas. In addition to underground pilot in situ tests, other facilities have been constructed or modified to monitor the performance of spent fuel in dry storage wells and self-shielded concrete casks. As the National Waste Terminal Storage (NWTS) programme advances to the next stage of underground site characterization for each of three different geological sites, additional pilot facilities are under consideration. These include a Test and Evaluation Facility (TEF) for site verification and equipment performance and testing, as well as a salt testing facility for verification of in situ simulation equipment. Although not associated with the NWTS programme, the construction of the Waste Isolation Pilot Plant (WIPP) in the bedded salts of New Mexico is well under way for deep testing and experimentation with the defence programme's transuranic nuclear waste. (author)

  14. Wind farm acceptance for sale? Evidence from the Danish wind farm co-ownership scheme

    DEFF Research Database (Denmark)

    Johansen, K.; Emborg, J.

    2018-01-01

    -investors already support the planned wind farm projects, and many project opponents will not engage themselves in something they are against in principle. Finally, economic benefits potentially gained via OPSS do not appear to compensate for values feared violated by wind farms by many wind farm project...

  15. Operation and control of large wind turbines and wind farms

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, Poul; Hansen, Anca D.; Thomsen, Kenneth (and others)

    2005-09-01

    This report is the final report of a Danish research project 'Operation and control of large wind turbines and wind farms'. The objective of the project has been to analyse and assess operational strategies and possibilities for control of different types of wind turbines and different wind farm concepts. The potentials of optimising the lifetime/energy production ratio by means of using revised operational strategies for the individual wind turbines are investigated. Different strategies have been simulated, where the power production is decreased to an optimum when taking loads and actual price of produced electricity into account. Dynamic models and control strategies for the wind farms have also been developed, with the aim to optimise the operation of the wind farms considering participation in power system control of power (frequency) and reactive power (voltage), maximise power production, keep good power quality and limit mechanical loads and life time consumption. The project developed models for 3 different concepts for wind farms. Two of the concepts use active stall controlled wind turbines, one with AC connection and one with modern HVDC/VSC connection of the wind farm. The third concept is based on pitch controlled wind turbines using doubly fed induction generators. The models were applied to simulate the behaviour of the wind farm control when they were connected to a strong grid, and some initial simulations were performed to study the behaviour of the wind farms when it was isolated from the main grid on a local grid. Also the possibility to use the available information from the wind turbine controllers to predict the wind speed has been investigated. The main idea has been to predict the wind speed at a wind turbine using up-wind measurements of the wind speed in another wind turbine. (au)

  16. 2016 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-08-10

    The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. You can find the report, a presentation, and a data file on the Files tab, below. Additionally, several data visualizations are available in the Data Visualizations tab. Highlights of this year’s report include: -Wind power additions continued at a rapid clip in 2016: $13 billion was invested in new wind power plants in 2016. In 2016, wind energy contributed 5.6% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and 29% to 37% in three of those states—Iowa, South Dakota, and Kansas. -Bigger turbines are enhancing wind project performance: Increased blade lengths, in particular, have dramatically increased wind project capacity factors, one measure of project performance. For example, the average 2016 capacity factor among projects built in 2014 and 2015 was 42.6%, compared to an average of 32.1% among projects built from 2004 to 2011 and 25.4% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008, to $800–$1,100/kW. Overall, the average installed cost of wind projects in 2016 was $1,590/kW, down $780/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at nearly 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Texas, Iowa, Oklahoma). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The supply chain continued to adjust to swings in domestic demand for wind equipment: Wind sector employment reached a new high of

  17. Early screening for dyslexia--a collaborative pilot project.

    Science.gov (United States)

    Ball, S; Becker, T; Boys, M; Davies, S; Noton, H

    2001-01-01

    An ongoing collaborative project, currently being piloted in 12 Wiltshire primary schools, is described. The aim is to provide a means of identifying potentially dyslexic children by the end of Key Stage 1 (Year 2) with a view to early intervention. The causal links identified by research between phonological skills and literacy development are taken as the theoretical basis of an initial screening procedure, and an intervention package is implemented for identified children. Those demonstrating persistent difficulties one year later are further assessed over a school term using an assessment package designed to identify those children showing a dyslexic profile. Further intervention is then planned and implemented.

  18. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  19. Streaking into middle school science: The Dell Streak pilot project

    Science.gov (United States)

    Austin, Susan Eudy

    A case study is conducted implementing the Dell Streak seven-inch android device into eighth grade science classes of one teacher in a rural middle school in the Piedmont region of North Carolina. The purpose of the study is to determine if the use of the Dell Streaks would increase student achievement on standardized subject testing, if the Streak could be used as an effective instructional tool, and if it could be considered an effective instructional resource for reviewing and preparing for the science assessments. A mixed method research design was used for the study to analyze both quantitative and qualitative results to determine if the Dell Streaks' utilization could achieve the following: 1. instructional strategies would change, 2. it would be an effective instructional tool, and 3. a comparison of the students' test scores and benchmark assessments' scores would provide statistically significant difference. Through the use of an ANOVA it was determined a statistically significant difference had occurred. A Post Hoc analysis was conducted to identify where the difference occurred. Finally a T-test determined was there was no statistically significance difference between the mean End-of-Grade tests and four quarterly benchmark scores of the control and the experimental groups. Qualitative research methods were used to gather results to determine if the Streaks were an effective instructional tool. Classroom observations identified that the teacher's teaching styles and new instructional strategies were implemented throughout the pilot project. Students had an opportunity to complete a questionnaire three times during the pilot project. Results revealed what the students liked about using the devices and the challenges they were facing. The teacher completed a reflective questionnaire throughout the pilot project and offered valuable reflections about the use of the devices in an educational setting. The reflection data supporting the case study was drawn

  20. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  1. Wind farm turbulence impacts on general aviation airports in Kansas.

    Science.gov (United States)

    2014-01-01

    Wind turbines and wind farms have become popular in the State of Kansas. Some general aviation pilots have expressed a concern about the : turbulence that the spinning blades are creating. If a wind farm is built near an airport, does this affect the...

  2. Solar Wind Earth Exchange Project (SWEEP)

    Science.gov (United States)

    2016-10-28

    highly charged ions of the solar wind. The main challenge in predicting the resultant photon flux in the X-ray energy bands is due to the...Newton, an X-ray astronomical observatory. We use OMNI solar wind conditions, heavy ion composition data from ACE, the Hodges neutral hydrogen model...of SWEEP was to compare theoretical models of X-ray emission in the terrestrial magnetosphere caused by the Solar Wind Charge Exchange

  3. Displacement of diesel fuel with wind energy in rural Alaskan villages. Final progress and project closeout report

    Energy Technology Data Exchange (ETDEWEB)

    Meiners, Dennis [Alaska Industrial Development and Export Authority, Anchorage, AK (United States); Drouhilet, Steve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Reeve, Brad [Alaska Industrial Development and Export Authority, Anchorage, AK (United States); Bergen, Matt [Kotzebue Electric Association, Kotzebue, AK (United States)

    2002-03-11

    The basic concept behind this project was to construct a wind diesel hybrid power system which combines and maximizes the intermittent and variable energy output of wind turbine(s) with diesel generator(s) to provide continuous high quality electric power to weak isolated mini-grids.

  4. North Antelope Highlands Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Pearlson, Matthew [Citizens Energy Corporation (CEC), Boston, MA (United States)

    2016-05-03

    This is the final report on the Wind Energy Development of 190 Mw on the Rosebud Indian Reservation in collaboration with Citizens Energy Corporation. The report discusses all pre-development activities since July of 2010 when award was granted. A systems impact study along with wind data accumulated over the past 5 years is contained in this report. We have responded to several RFPs concerning the sale of energy to certain offtakers, but we have failed to win a Power Purchase Agreement due to existing wind farms that won and the interconnection costs were already included in a previous PPAs, which we don't have that luxury. We continue this effort and hopefully in the near future we will win an RFP.

  5. Wind power project at Pasni

    International Nuclear Information System (INIS)

    Masud, Jamil

    1998-01-01

    Major power generation capacity additions have recently been achieved in Pakistan as a result of policy initiatives taken in response to widespread power shortages in the eighties. These additions are based mainly on residual fuel oil and natural gas as fuel, resulting in a marked shift in favor of thermal generation and away from the traditionally dominant hydel sources. In recent decades, the supply of electricity to less developed areas has also been accorded high priority in Pakistan, although economic considerations in grid expansion have largely limited an otherwise aggressive rural electrification program to areas easily accessible from the national grid. These factors, coupled with relatively high system losses, have contributed to an unprecedented increase in emissions of greenhouse gases from the power generation industry in the country. An option which merits serious consideration in Pakistan is wind power. Wind power provides an opportunity to reduce dependence on imported fossil fuels and, at the same time, expand the power supply capacity to remote locations where grid expansion is not practical. Preliminary analysis of wind data in selected coastal locations in the Balochistan province indicates that a potential exists for harvesting wind energy using currently available technologies. (author)

  6. The Biomarker Knowledge System Informatics Pilot Project Supplement To The Biomarker Development Laboratory at Moffitt (Bedlam) — EDRN Public Portal

    Science.gov (United States)

    The Biomarker Knowledge System Informatics Pilot Project goal will develop network interfaces among databases that contain information about existing clinical populations and biospecimens and data relating to those specimens that are important in biomarker assay validation. This protocol comprises one of two that will comprise the Moffitt participation in the Biomarker Knowledge System Informatics Pilot Project. THIS PROTOCOL (58) is the Sput-Epi Database.

  7. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  8. Location Independent Professional Project: A Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  9. The National Map - Missouri Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  10. The National Map - Delaware Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  11. The National Map - Pennsylvania Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  12. The National Map - Texas Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  13. The National Map - Florida Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  14. Wind power development field test project at Hirashima, Sakito-cho. Detailed wind characteristics survey; Sakitocho Hirashima ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Hirashima, Sakito-cho, Nishisonogi-gun, Nagasaki Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 7.1m/s and the maximum wind speed in the period was 37m/s. Winds came prevalently from N (13.9%), and then from NNE (13.3%), NW (12.2%), and NE (10.7%). The total wind direction occurrence rate involving the 4 directions was 50.1%. Turbulence intensity was 0.14 at wind speed 2.0m/s or more and 0.12 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 77-87% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  15. DSM energy saving pilot project report. Furniture Plant Teika, Riga, Latvia

    International Nuclear Information System (INIS)

    Ananevski, V.; Kalejs, M.; Hercogs, J.; Blumbergs, U.

    1995-07-01

    The purpose of this pilot project was to carry out energy audit into the furniture plant TEIKA and energy saving measures. Another aim was to transfer the Danish know how and experience obtained through the Danish effort in Latvian industries consumers. Therefore great attention is paid to energy mapping in order to show possibilities of the Danish methodisms. This report is a part of the Joint Latvian - Danish Project Demand Side Management and Energy Saving. It is a results of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and on the other hand a Danish team, which was represented by the Danish Power Consult company NESA. (EG)

  16. Wind Energy Japan

    Energy Technology Data Exchange (ETDEWEB)

    Komatsubara, Kazuyo [Embassy of the Kingdom of the Netherlands, Tokyo (Japan)

    2012-06-15

    An overview is given of wind energy in Japan: Background; Wind Energy in Japan; Japanese Wind Energy Industry; Government Supports; Useful Links; Major Japanese Companies; Profiles of Major Japanese Companies; Major Wind Energy Projects in Japan.

  17. Full scale measurement of wind induced pressures : 1 configuration of wind induced pressures

    NARCIS (Netherlands)

    Geurts, C.P.W.; Wijen, H.L.M.

    1994-01-01

    A research project 10 the spectral characteristics of wind induced pressures is in progress in Eindhoven. This project includes both wind tunnel and full scale measurements. Wind induced pressures are measured in full scale at the main building of Eindhoven University of Technology. This paper

  18. Field Verification Project for Small Wind Turbines Quarterly Report; July-September 2001, 3rd Quarter, Issue#6

    Energy Technology Data Exchange (ETDEWEB)

    2003-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted at the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  19. Wind-tunnel investigation of an armed mini remotely piloted vehicle. [conducted in Langley V/STOL tunnel

    Science.gov (United States)

    Phelps, A. E., III

    1979-01-01

    A wind tunnel investigation of a full scale remotely piloted vehicle (RPV) armed with rocket launchers was conducted. The model had unacceptable longitudinal stability characteristics at negative angles of attack in the original design configuration. The addition of a pair of fins mounted in a V arrangement on the propeller shroud resulted in a configuration with acceptable longitudinal stability characteristics. The addition of wing mounted external stores to the modified configuration resulted in a slight reduction in the longitudinal stability. The lateral directional characteristics of the model were generally good, but the model had low directional stability at low angles of attack. Aerodynamic control power was very strong around all three axes.

  20. Handheld computers in nursing education: PDA pilot project.

    Science.gov (United States)

    Koeniger-Donohue, Rebecca

    2008-02-01

    Interest in the use and application of handheld technology at undergraduate and graduate nursing programs across the country is growing rapidly. Personal digital assistants (PDAs) are often referred to as a "peripheral brain" because they can save time, decrease errors, and simplify information retrieval at the point of care. In addition, research results support the notion that PDAs enhance nursing clinical education and are an effective student learning resource. However, most nursing programs lack the full range of technological resources to implement and provide ongoing support for handheld technology use by faculty and students. This article describes a 9-month pilot project for the initial use of PDAs by novice faculty and students at Simmons College.

  1. The photovoltaic pilot projects of the European Community

    Science.gov (United States)

    Schnell, W.

    The Commission of the European Communities has started in 1980 a programme for the design and construction of a series of photovoltaic pilot projects in the range of 30-300 kWp. Virtually all important industries and other development organisations in Europe working on photovoltaic cells and systems are involved in this programme. The different technologies which are being developed concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of an island, villages, recreation centres, water desalination and disinfection, powering of radio transmitters, emergency power plants, dairy farm, training school, cooling, water pumping, powering of a solar heated swimming pool and last but not least, hydrogen production.

  2. The Palouse Basin Participatory Model Pilot Project: A Participatory Approach to Bi-state Groundwater Management

    Science.gov (United States)

    Beall, A.; Fiedler, F.; Boll, J.; Cosens, B.; Harris, C.

    2008-12-01

    In March 2008, The University of Idaho Waters of the West, the Palouse Basin Aquifer Committee and its Citizen Advisory Group undertook a pilot project to explore the use of participatory modeling to assist with water resource management decisions. The Palouse basin supplies Moscow, Idaho, Pullman, Washington, and surrounding communities with high quality groundwater. However, water levels in the major aquifer systems have been declining since records have been kept. Solutions are complicated by jurisdictional considerations and limited alternatives for supply. We hope that by using a participatory approach major conflicts will be avoided. Group system dynamics modeling has been used for various environmental concerns such as air quality, biological management, water quality and quantity. These models create a nexus of science, policy, and economic and social concerns, which enhances discussion of issues surrounding the use of natural resources. Models may be developed into educational and or decision support tools which can be used to assist with planning processes. The long-term goal of the Palouse basin project is to develop such a model. The pilot project participants include hydrologists, facility operators, policy makers and local citizens. The model they have developed integrates issues such as scientific uncertainty, groundwater volumes, and potential conservation measures and costs. Preliminary results indicate that participants are satisfied with the approach and are looking to use the model for education and to help direct potential research. We will present the results of the pilot project, including the developed model and insights from the process.

  3. Report on wind energy for small communities

    Energy Technology Data Exchange (ETDEWEB)

    Maissan, J.F. [Leading Edge Projects Inc., Whitehorse, YT (Canada)

    2006-04-15

    Wind energy projects can be economically viable in the north under a range of conditions when oil prices are in the range of $60 U.S. per barrel. Some of the requirements for economic viability include locations with economies of scale, availability of local equipment, availability of local technical human resources, access to reasonable transportation, and a committed community and project proponent. This paper presented the results of a study on wind energy in small northern communities. The objective of the paper was to provide an assessment of the feasibility of wind power to community leaders in diesel-dependant remote communities. The paper provided a review of wind power technologies including wind turbines; wind turbine towers; wind-diesel integration; wind penetration levels; anti-icing technology; suppliers of wind-diesel integration systems; and wind turbine manufacturers promoting wind-diesel systems. The paper also provided a review of the historical capital costs for the installation of wind projects; recommendations from project developers; project site selection criteria; as well as a simplified economic analyses for small communities. The paper also discussed the successful Kotzebue Alaska wind-diesel project as a model to follow. It described how to start a wind energy program with reference to the roles of the federal government, territorial governments and their power utilities. It was demonstrated that wind energy can be a cost effective option to reduce diesel generation requirements in the appropriate circumstances. It was concluded that deployment of wind energy in the north still needs to proceed on a carefully planned path beginning with leader projects and branching out from there. In addition, there is a need for good quality wind resource assessment at potential wind project locations in many communities in the north. refs., tabs., figs.

  4. South Baltic wind atlas. South Baltic offshore wind energy regions project

    Energy Technology Data Exchange (ETDEWEB)

    Pena, A.; Hahmann, A.; Hasager, C.B.; Bingoel, F.; Karagali, I.; Badger, J.; Badger, M.; Clausen, Niels-Erik

    2011-05-15

    A first version of a wind atlas for the South Baltic Sea has been developed using the WRF mesoscale model and verified by data from tall Danish and German masts. Six different boundary-layer parametrization schemes were evaluated by comparing the WRF results to the observed wind profiles at the masts. The WRF modeling was done in a nested domain of high spatial resolution for 4 years. In addition the long-term wind statistics using the NCAR-NCEP reanalysis data were performed during 30 years to provide basis for a long-term adjustment of the results and the final WRF results include a weighting for the long-term trends variability in the South Baltic Sea. Observations from Earth observing satellites were used to evaluate the spatial resolution of the WRF model results near the surface. The QuikSCAT and the WRF results compared well whereas the Envisat ASAR mean wind map showed some variation to the others. The long-term analysis revealed that the South Baltic Sea has a spatially highly variable wind climate during the 30-years. (Author)

  5. Thermal sludge treatment. Pilot project on the possibilities and marginal conditions; Thermische slibontsluiting. Pilot-onderzoek naar de mogelijkheden en randvoorwaarden

    Energy Technology Data Exchange (ETDEWEB)

    Berkhof, D.; Koornneef, E.; Janus, H. [Royal Haskoning DHV, Amersfoort (Netherlands)

    2012-09-15

    As part of the agreements within the framework of the Dutch Green Deal between Water Boards and the Ministry of Economic Affairs, Agriculture and Innovation (ELI) a research program has been set up which addresses the implementation of new developments that can improve energy efficiency in the treatment of waste water. Attention is paid to supercritical gasification, supercritical oxidation and conventional gasification. The study on conventional gasification is split into two phases: research into the economic feasibility in combination with TDH (thermal pressure hydrolysis) and drying, and next to that a pilot plant. This report concerns phase 2: pilot projects on thermal sewage treatment [Dutch] Als onderdeel van de afspraken in het kader van de Green Deal tussen Waterschappen en het ministerie van ELI is een onderzoeksprogramma opgesteld gericht op het implementeren van nieuwe ontwikkelingen die de energie efficientie bij de verwerking van afvalwater kunnen verbeteren. Daarbij wordt gekeken naar superkritische vergassing en oxidatie en naar conventionele vergassing. De studie naar conventionele vergassing is gesplitst in 2 fasen: onderzoek naar de economische haalbaarheid in combinatie met TDH (thermische druk hydrolyse), en drogen en daarnaast een onderzoek op pilot plant/praktijkschaal. In de onderhavige rapportage wordt fase 2, het onderzoek op pilot plant/praktijkschaal naar thermische slibontsluiting (TSO) beschreven.

  6. Wind Energy Resource Atlas of Mongolia

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, D; Schwartz, M; Scott, G.; Haymes, S.; Heimiller, D.; George, R.

    2001-08-27

    The United States Department of Energy (DOE) and the United States Agency for International Development (USAID) sponsored a project to help accelerate the large-scale use of wind energy technologies in Mongolia through the development of a wind energy resource atlas of Mongolia. DOE's National Renewable Energy Laboratory (NREL) administered and conducted this project in collaboration with USAID and Mongolia. The Mongolian organizations participating in this project were the Scientific, Production, and Trade Corporation for Renewable Energy (REC) and the Institute of Meteorology and Hydrology (IMH). The primary goals of the project were to develop detailed wind resource maps for all regions of Mongolia for a comprehensive wind resource atlas, and to establish a wind-monitoring program to identify prospective sites for wind energy projects and help validate some of the wind resource estimates.

  7. Future energy research in the EU under EIT conditions-pilot projects

    Energy Technology Data Exchange (ETDEWEB)

    Puehringer-Oppermann, Franziska; Bele, Petra; Bussar, Rainer; Stimming, Ulrich [TUM, Dept. of Physics, E19, James-Franck Str. 1, D-85748 Garching (Germany)

    2009-07-01

    The European Institute of Innovation and Technology (EIT) has been established in April 2008. It is an independent organisation with the administrative head in Budapest, a governing board, an executive committee and a chairman. The EIT budget until 2012 is 308 MEUR. EIT will operate through the formation of Knowledge and Innovation Communities (KICs). The first three KICs are foreseen in the areas sustainable energy, ICT and climate mitigation. The European Commission has sponsored four pilot projects (conducted 2008-2009) to help develop a suitable governance structure for cooperations on European scale such as the future KICs. They are Bridge, ComplexEIT, SUCCESS and Gast, dealing with different topics like nanomedicine (Bridge), integration of hardware and software (ComplexEIT), sustainable energy (SUCCESS) and green and safe road transportation (Gast). The strategic objective of these pilot projects is to design, implement and test new models of cooperation in the knowledge triangle. We are involved in SUCCESS and after benchmarking of 66 collaborations in the field sustainable energy, the state of the art of selected representative topics was asessed and shortcomings in governance evaluated by SWOT analysis. In parallel further existing collaborations were used to extract and establish a management structure for such collaborations on the European scale.

  8. Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.

    Energy Technology Data Exchange (ETDEWEB)

    Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

    2006-03-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

  9. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  10. Noise immission from wind turbines

    International Nuclear Information System (INIS)

    1999-01-01

    The project has dealt with practical ways to reduce the influence of background noise caused by wind acting on the measuring microphones. The uncertainty of measured noise emission (source strength) has been investigated. The main activity was a Round Robin Test involving measurements by five laboratories at the same wind turbine. Each laboratory brought its own instrumentation and performed the measurements and analyses according to their interpretation. The tonality of wind turbine noise is an essential component of the noise impact on the environment. In the present project the uncertainty in the newest existing methods for assessing tonality was investigated. The project included noise propagation measurements in different weather conditions around wind turbines situated in different types of terrain. The results were used to validate a noise propagation model developed in the project. Finally, the project also included a study with listeners evaluating recordings of wind turbine noise. The results are intended as guidance for wind turbine manufacturers in identifying the aspects of wind turbine noise most important to annoyance. (author)

  11. Current projects of the National Wind Coordinating Committee

    Energy Technology Data Exchange (ETDEWEB)

    Rhoads, H. [National Wind Coordinating Committee, Washington, DC (United States)

    1997-12-31

    This paper summarizes the activities of the National Wind Coordinating Committee (NWCC), a multi-stakeholder collaborative formed in 1994 to support the responsible use of wind power in the USA. The NWCC`s vision is a self-sustaining commercial market for wind power - environmentally, economically, and politically sustainable. Current NWCC activities include: outreach initiatives, disseminating information about wind energy to regulators and legislators through the Wind Energy Issue Paper Series, researching distributed wind energy models, producing a wind facility permitting handbook, improving avian research, addressing transmission and resource assessment issues, and exploring sustainable development and marketing approaches.

  12. Monthly Wind Characteristics and Wind Energy in Rwanda

    African Journals Online (AJOL)

    user

    Abstract. Evaluating wind power potential for a site is indispensable before making any decision for the installation of wind energy infrastructures and planning for relating projects. This paper presents a branch of a composite analysis whose objective was to investigate the potential of wind energy resource in Rwanda.

  13. Financial analysis of wind power projects; Analisis financiero de proyectos eolicos de generacion electrica

    Energy Technology Data Exchange (ETDEWEB)

    Juanico, Luis E; Bergallo, Juan E [Comision Nacional de Energia Atomica, San Carlos de Bariloche (Argentina). Centro Atomico Bariloche

    1999-07-01

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO{sub 2} emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries.

  14. Twenty-first century wave climate projections for Ireland and surface winds in the North Atlantic Ocean

    Science.gov (United States)

    Gallagher, Sarah; Gleeson, Emily; Tiron, Roxana; McGrath, Ray; Dias, Frédéric

    2016-04-01

    Ireland has a highly energetic wave and wind climate, and is therefore uniquely placed in terms of its ocean renewable energy resource. The socio-economic importance of the marine resource to Ireland makes it critical to quantify how the wave and wind climate may change in the future due to global climate change. Projected changes in winds, ocean waves and the frequency and severity of extreme weather events should be carefully assessed for long-term marine and coastal planning. We derived an ensemble of future wave climate projections for Ireland using the EC-Earth global climate model and the WAVEWATCH III® wave model, by comparing the future 30-year period 2070-2099 to the period 1980-2009 for the RCP4.5 and the RCP8.5 forcing scenarios. This dataset is currently the highest resolution wave projection dataset available for Ireland. The EC-Earth ensemble predicts decreases in mean (up to 2 % for RCP4.5 and up to 3.5 % for RCP8.5) 10 m wind speeds over the North Atlantic Ocean (5-75° N, 0-80° W) by the end of the century, which will consequently affect swell generation for the Irish wave climate. The WAVEWATCH III® model predicts an overall decrease in annual and seasonal mean significant wave heights around Ireland, with the largest decreases in summer (up to 15 %) and winter (up to 10 %) for RCP8.5. Projected decreases in mean significant wave heights for spring and autumn were found to be small for both forcing scenarios (less than 5 %), with no significant decrease found for RCP4.5 off the west coast in those seasons.

  15. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  16. Scaling the quality of clinical audit projects: a pilot study.

    Science.gov (United States)

    Millard, A D

    1999-06-01

    To pilot the development of a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments, assessing the quality of clinical audit projects, to form a Likert scale. The audit facilitators were based in Scottish health boards and trusts. The participants were audit facilitators known to have over 2 years experience of supporting clinical audit. The response at first test was 11 out of 14 and at the second test it was 27 out of 46. The draft scale was tested by 27 audit facilitators who expressed their strength of agreement or disagreement with each statement for three reports. Validity was assessed by test-re-test, item-total, and total-global indicator correlations. Of the 20 statements, 15 had satisfactory correlations with scale totals. Scale totals had good correlations with global indicators. Test-re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  17. Success Factors in Wind Power Projects; Factores de Exito en Proyectos de Energia Eolica

    Energy Technology Data Exchange (ETDEWEB)

    Cabal Cuesta, H; Varela Conde, M; Lago Rodriguez, C; Saez Angulo, R M

    2002-07-01

    The Spanish wind energy market has experienced an average annual increase over 60% in recent years. With more than 4.1 GW of power at the end of 2002, this market has became the second in Europe and the third the world. With the objective of obtaining the origin of this success,an analysis of technical and economic features of selected wind projects has been undertaken to draw the outstanding factors that any new independent promoter/developer should take into account within this market. (Author) 16 refs.

  18. Wind farm projects as joint ventures between a Danish utility and private cooperatives

    International Nuclear Information System (INIS)

    Moerup-Petersen, V.; Pedersen, S.

    1992-01-01

    Four cases on successful cooperation between the Danish utility, NESA A/S, and private wind cooperatives are described. In two cases the utility was invited to share the projects prepared by the cooperatives. In the third case the project was developed by the utility. The fourth and most ambitious project, where construction work is just about to start, both parties are involved on a 50/50 basis. The experience gained from the different projects is described. The paper discusses the advantages and disadvantages of joint projects for both parties. Different models on cooperation are outlined. Mainly based on NESA's experience, the joint concept is recommended by the Danish Ministry of Environment. The aim is to get the optimal utilization of the limited siting possibilities in Denmark. The future perspectives of joint projects are anticipated. (au)

  19. The cultural analysis in the environmental impact studies. Jepirachi wind pilot project and connecting road between the Aburra valley and Cauca River

    International Nuclear Information System (INIS)

    Ruiz, Aura Luz; Carmona, Sergio Ivan

    2006-01-01

    This article is synthesis of the investigation to choose I in environment title of Master and Development of the National University of Host Colombia Medellin, on the speech, the social images and representations that emerge in the Studies from environmental Impact -EIA- from the cultural systems from communities affected by the implantation and operation. From two macro projects, that are part of the Plans of national Development, regional and local in Colombia: one, the Project Pilot of Generation of Aeolian Energy Jepirachi, in Colombian the Guajira discharge that affects indigenous communities of several establishments Wayuu in the sector of Average Moon. The other, the project of Road Connection between Valleys of the Aburra River - and the Cauca River, which it affects communities that inhabit an axis of rural transition - urban, whose cultural composition is diverse in its origin, mobility and interactions. It was left from two hypotheses: one, is that the analysis made in the cultural dimension of the EIA, is insufficient lo identify, lo evaluate and to handle the impacts on the cultural systems; second, front lo the treatment of the cultural systems is the existence of fundamental differences. There is cultural systems in Colombia which status is recognized greater and category than to others. The analysis of the speech allowed to obtain a diagnosis on semantic the rhetorical structure and - formal and textual cohesion, coherence, correlations and associations in the EIA and to identify the social images and representations that emerge on the populations taken part by the projects. Finally conclusions. That consider they leave to the debate on the cultural analyses that have been made in the EIA ,their emptiness and limitations and the different courses open that can take futures works from investigation

  20. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  1. Virginia Offshore Wind Technology Advancement Project (VOWTAP) DOE EE0005985 Final Technical Report Rev 1a

    Energy Technology Data Exchange (ETDEWEB)

    Pietryk, Steven [Dominion, Richmond, VA (United States)

    2017-01-31

    The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGs (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.

  2. Wind power today: 1999 Wind Energy program highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, Pat

    2000-04-06

    Wind Power Today is an annual publication that provides an overview for the Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy for the 21st century. Content objectives include: Educate readers about the advantages and potential for widespread deployment of wind energy; explain DOE wind energy program objectives and goals; describe program accomplishments in research and application; examine the barriers to widespread deployment; describe benefits of continued research and development; facilitate technology transfer; attract cooperative wind energy projects with industry.

  3. Regional Focus on Small-scale wind power (<50kW) in southeastern Sweden within the Network for wind farms. Final Report, Project No. 31852-1. ; Regional Satsning paa Smaaskalig vindkraft (<50kW) i sydoestra Sverige inom Naetverket foer vindbruk. Slutrapport, projekt nr 31852-1.

    Energy Technology Data Exchange (ETDEWEB)

    Tyrberg, Lennart (ed.)

    2011-07-01

    Energy Agency for Southeast Sweden AB, the Swedish Network for wind farming and the EU project RuralRES have collaborated in this project. The project has resulted in a competence buildup and dissemination of small-scale wind power knowledge. The project has, among other things documented good practices and performs feasibility studies for establishment of small scale wind power. This work has led to an understanding of preconditions for a successful investment in small-scale wind power. The dissemination of this knowledge here in the region, in other parts of Sweden and to other partners in the EU project has contributed to a more realistic level of expectations on small-scale wind power, something that is very important for the industry's continued development. A good wind location is the most important prerequisite for a successful wind power project; this applies to small as well as large-scale wind power. Availability of reliable wind turbines with good performance is important for the development of the industry. Further, it should be reasonably easy to get building permits and permits for electricity connection. The growth might be stimulated by the introduction of net charging and an adaptation of the electricity certificate system for small producers.

  4. Yeu and Noirmoutier islands - Electric connection to the offshore wind farm. Brochure 'Electric connection of the offshore wind farm to the Yeu and Noirmoutier islands' - Consultation file, December 2015, District of Vendee. Document of contribution to the public debate. Yeu and Noirmoutier islands offshore wind farm project - Project commissioner file

    International Nuclear Information System (INIS)

    Boyadjis, Jean-Marc; Corallo, Christian

    2015-05-01

    After a brief presentation of the context, a first document presents the connection characteristics, the general route of the electrical connection, how the sea and ground environment is taken into account, how the population is consulted for the project, the organisation of the public inquiry. The second document presents the consultation file with a description of the adopted solution and main characteristics of the project of connection of offshore wind farms about the Yeu and Noirmoutier islands, an analysis of the initial condition of the environment (physical and natural environment, landscapes and heritage, human and social-economic context), a description and a comparative analysis of proposed beams for the underwater connection, landfall and underground connection, and the planned continuation of the project (consultation, administrative procedure, planning). The next document aims at presenting the project before public consultation: objectives, underwater and underground connections with some of their technical characteristics, planning. Another document also presents the offshore wind farm project, its energetic and technical characteristics, how it is integrated into its environment (stakes and challenges, impacts on landscape and on activities), how it is an example of the development of offshore wind energy sector. It is completed by several appendices containing a variety of data on these issues. A last document is a presentation of the project by the project commissioner (RTE) which notably addresses how technical and environmental issues are to be addressed

  5. Evaluation of bridge decks using non-destructive evaluation (NDE) at near highway speeds for effective asset management - pilot project.

    Science.gov (United States)

    2016-09-29

    This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...

  6. Russian energy efficiency projects: lessons learnt from Activities Implemented Jointly pilot phase

    International Nuclear Information System (INIS)

    Korppoo, Anna

    2005-01-01

    Russia needs to improve the efficiency of energy. Failure to do so will retard the economic recovery of the country, but the energy sector is lacking both domestic and foreign investments. JI projects could provide the underfinanced Russian energy sector with additional investments. AIJ pilot project experiences provide an overview of the potential difficulties for future JI projects. Institutional problems were the most important category. Most of these problems remain, and the lack of ratification of the Kyoto Protocol by Russia has formed a new very significant barrier. Implementation level problems caused some problems to AIJ projects, but they are likely to have less impact on the better prepared JI projects. The character of funding-related problems has changed: for AIJ projects the main problem was that emission reductions could not be credited, whereas future JI projects will experience more competition in the Kyoto market where the overall investment climate and the availability of local cofunding are more relevant. Therefore, the unfinished economic and energy sector reforms currently discourage JI investments. The project experiences so far have been dismal, and if Russian policy-makers cannot improve this performance, only few JI projects can be expected in the future

  7. An analysis of the impact of the thermonuclear pilot project ITER on industry and research in Austria

    International Nuclear Information System (INIS)

    Hangel, G.

    2007-03-01

    An analysis of the influence of the thermonuclear pilot project ITER on Austrian research and industrial activities is presented in terms of the following subjects: fusion research history, ITER technique, security, nuclear fusion, ITER (reactor, project specifications for quotations), possibilities for Austrian companies and fusion research in Austria. (nevyjel)

  8. Life-Long Cyberlearning System: A Pilot Project for the "Learning Society" in the ROC.

    Science.gov (United States)

    Han, Huei-Wen; Wang, Yen-Chao

    1999-01-01

    Provides an overview of the implementation of lifelong learning in Taiwan, Republic of China (ROC) as part of its educational reform policy and describes a pilot project, the Lifelong Cyberlearning System. Highlights include planning architecture, Web-based learning technology, professional education, industrial and corporate assistance, and…

  9. Communication training as a part of medical education: a pilot project

    Directory of Open Access Journals (Sweden)

    Petersen, Corinna

    2005-01-01

    Full Text Available Within the last years, the importance of communication skills regarding the doctor-patient-relationship received more attention. Medical school curricula for future physicians must include teaching of communication skills as well. A pilot project for training communicative basic skills at the University Hospital Hamburg-Eppendorf will be presented. The content of teaching was generated by employees of the Institute and Policlinics of Medical Psychology. Contents of the course will be described and experiences discussed.

  10. Canadian small wind market

    International Nuclear Information System (INIS)

    Moorhouse, E.

    2010-01-01

    This PowerPoint presentation discussed initiatives and strategies adopted by the Canadian Wind Energy Association (CanWEA) to support the development of Canada's small wind market. The general public has shown a significant interest in small wind projects of 300 kW. Studies have demonstrated that familiarity and comfort with small wind projects can help to ensure the successful implementation of larger wind projects. Small wind markets include residential, farming and commercial, and remote community applications. The results of CanWEA market survey show that the small wind market grew by 78 percent in 2008 over 2007, and again in 2009 by 32 percent over 2008. The average turbine size is 1 kW. A total of 11,000 turbines were purchased in 2007 and 2008. Global small wind market growth increased by 110 percent in 2008, and the average turbine size was 2.4 kW. Eighty-seven percent of the turbines made by Canadian mid-size wind turbine manufacturers are exported, and there is now a significant risk that Canada will lose its competitive advantage in small wind manufacturing as financial incentives have not been implemented. American and Canadian-based small wind manufacturers were listed, and small wind policies were reviewed. The presentation concluded with a set of recommendations for future incentives, educational programs and legislation. tabs., figs.

  11. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  12. Wind Resource Assessment and Requested Wind Turbine Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Ken [Municipal Civil Corporation, Gas City, IN (United States); Wolar, John [Municipal Civil Corporation, Gas City, IN (United States)

    2012-10-22

    Alternate Energy Solutions, Inc. (“AESWR”) was engaged by the Town of Brookston (“Brookston”) to assemble, erect and maintain one 60 m XHD meteorological tower manufactured by NRG Systems, Inc.; for monitoring, recording and evaluating collected wind data. It is the opinion of AESWR staff that study results support the development of a wind turbine project at the Bol Family Farm provided: a) additional land is leased for the project; b) project construction costs are controlled; and c) a prudent power purchase agreement is negotiated with a power take-off entity. We believe that a project having an aggregate nameplate rating sized from 6.0 MW to 20 MW would be appropriate for this location. We recommend 100-125 acres of land per installed MW be used as a general rule for acquiring wind energy land lease agreements, total land lease holdings to be acquired would then approach 750 acres to 2,500 acres.

  13. Wind farm turbulence impacts on general aviation airports in Kansas : [technical summary].

    Science.gov (United States)

    2014-01-01

    Wind turbines and wind farms have become popular in the State of Kansas. Some general aviation : pilots have expressed a concern about the turbulence that the spinning blades are creating. If a : wind farm is built near an airport, does this affect t...

  14. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  15. Climatic wind tunnel for wind engineering tasks

    Czech Academy of Sciences Publication Activity Database

    Kuznetsov, Sergeii; Pospíšil, Stanislav; Král, Radomil

    2015-01-01

    Roč. 112, 2-B (2015), s. 303-316 ISSN 1897-628X R&D Projects: GA ČR(CZ) GA14-12892S Keywords : climatic tunnel * wind tunnel * atmospheric boundary layer * flow resistance * wind tunnel contraction Subject RIV: JM - Building Engineering https://suw.biblos.pk.edu.pl/resources/i5/i6/i6/i7/i6/r56676/KuznetsovS_ClimaticWind.pdf

  16. Coordinated voltage control in offshore HVDC connected cluster of wind power plants

    DEFF Research Database (Denmark)

    Sakamuri, Jayachandra Naidu; Rather, Zakir Hussain; Rimez, Johan

    This paper presents a coordinated voltage control scheme (CVCS) for a cluster of offshore wind power plants connected to a voltage-source converter-based high-voltage direct current system. The primary control point of the proposed voltage control scheme is the introduced Pilot bus, which is having...... by dispatching reactive power references to each wind turbine (WT) in the wind power plant cluster based on their available reactive power margin and network sensitivity-based participation factors, which are derived from the dV/dQ sensitivity of a WT bus w.r.t. the Pilot bus. This method leads...

  17. Field Verification Project for Small Wind Turbines, Quarterly Report: April - June 2001; 2nd Quarter, Issue No.5

    Energy Technology Data Exchange (ETDEWEB)

    2002-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted out of the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  18. Wind Power Today: 1998 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Tromly, K.

    1999-06-17

    The US Department of Energy's Office of Energy Efficiency and Renewable Energy manages the Federal Wind Energy Program. The mission of the program is to help the US wind industry to complete the research, testing, and field verification needed to fully develop advanced wind technologies that will lead the world in cost-effectiveness and reliability. This publication, printed annually, provides a summary of significant achievements in wind energy made during the previous calendar year. Articles include wind energy in the Midwest, an Alaskan wind energy project, the US certification program, structural testing, and the federal program in review.

  19. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  20. Pilot projects and their diffusion: a case study of integrated coastal management in South Africa

    CSIR Research Space (South Africa)

    Vreugdenhil, H

    2012-01-01

    Full Text Available contribution to the diffusion of the innovation and so to a policy transition in South African coastal zone management. Finally, we identify types of pilot project and the accompanying design choices that are most suitable for transition management....

  1. Second wind in the offshore wind industry

    International Nuclear Information System (INIS)

    Philippe, Edouard; Neyme, Eric; Deboos, Christophe; Villageois, Jean-Remy; Gouverneur, Philippe; Gerard, Bernard; Fournier, Eric; Petrus, Raymond; Lemarquis, David; Dener, Marc; Bivaud, Jean-Pierre; Lemaire, Etienne; Nielsen, Steffen; Lafon, Xavier; Lagandre, Pierre; Nadai, Alain; Pinot de Villechenon, Edouard; Westhues, Markus; Herpers, Frederick; Bisiaux, Christophe; Sperlich, Miriam; Bales, Vincent; Vandenbroeck, Jan; His, Stephane; Derrey, Thierry; Barakat, Georges; Dakyo, Brayima; Carme, Laurent; Petit, Frederic; Ytournel, Sophie; Westhues, Markus; Diller, Armin; Premont, Antoine de; Ruer, Jacques; Lanoe, Frederic; Declercq, Jan; Holmager, Morten; Fidelin, Daniel; Guillet, Jerome; Dudziak, Gregory; Lapierre, Anne; Couturier, Ludovic; Audineau, Jean-Pierre; Rouaix, Eric; De Roeck, Yann-Herve; Quesnel, Louis; Duguet, Benjamin

    2011-06-01

    After several keynote addresses, this publication contains contributions and Power Point presentations proposed during this conference on the development of offshore wind energy. The successive sessions addressed the following issues: the offshore mass production of electricity (examples of Denmark and Belgium, laying and protecting offshore cables), the space, economic and environmental planning (the Danish experience, the role of the Coastal area integrated management, importance of the public debate, so on), the logistics of port infrastructures (simulation tools, example of Bremerhaven, issues related to project management), innovation at the core of industrial strategies (high power wind turbines, the 6 MW Alstom turbine, chain value and innovation in offshore wind energy, the Vertiwing innovating project of a floating wind turbine, a bench test in Charleston, foundations, gravity base structures, the British experience, the Danish experience), the economic and organisational conditions for development, the validation and certification of technologies

  2. Wake losses optimization of offshore wind farms with moveable floating wind turbines

    International Nuclear Information System (INIS)

    Rodrigues, S.F.; Teixeira Pinto, R.; Soleimanzadeh, M.; Bosman, Peter A.N.; Bauer, P.

    2015-01-01

    Highlights: • We present a layout optimization framework for wind farms with moveable turbines. • Using moveable wind turbines in optimized layouts maximizes energy production. • Turbine and wind farm designers should cooperate to optimize offshore wind projects. - Abstract: In the future, floating wind turbines could be used to harvest energy in deep offshore areas where higher wind mean speeds are observed. Currently, several floating turbine concepts are being designed and tested in small scale projects; in particular, one concept allows the turbine to move after installation. This article presents a novel layout optimization framework for wind farms composed of moveable floating turbines. The proposed framework uses an evolutionary optimization strategy in a nested configuration which simultaneously optimizes the anchoring locations and the wind turbine position within the mooring lines for each individual wind direction. The results show that maximum energy production is obtained when moveable wind turbines are deployed in an optimized layout. In conclusion, the framework represents a new design optimization tool for future offshore wind farms composed of moveable floating turbines

  3. Using an Optionally Piloted Aircraft for Airborne Gravity Observations with the NOAA GRAV-D Project

    Science.gov (United States)

    Youngman, M.; Johnson, J. A.; van Westrum, D.; Damiani, T.

    2017-12-01

    The U.S. National Geodetic Survey's (NGS) Gravity for the Redefintion of the American Vertical Datum (GRAV-D) project is collecting airborne gravity data to support a 1 cm geoid. Started in 2008, this project will collect airborne gravity data over the entire U.S. and territories by 2022. As of June 30, 2017, the project was almost 62% complete. With recent technological developments, NGS has been exploring using unmanned aircraft for airborne gravity measurements. This presentation will focus on results from two surveys over the U.S. Appalachian and Rocky Mountains using the Aurora Centaur Optionally Piloted Aircraft and the Micro-g Lacoste Turnkey Airborne Gravimeter System 7 (TAGS7). Collecting high quality data as well as dealing with remote locations has been a challenge for the GRAV-D project and the field of airborne gravity in general. Unmanned aircraft could potentially improve data quality, handle hard to reach locations, and reduce pilot fatigue. The optionally piloted Centaur aircraft is an attractive option because it is not restricted in U.S. airspace and delivers high quality gravity data. Specifically, the Centaur meets U.S. Federal Aviation Administration regulations for Unmanned Aircraft Systems (UAS) by using a safety pilot on board to maintain line of sight and the ability to take control in the event of an emergency. Even though this is a sizeable UAS, most traditional gravimeters are too large and heavy for the platform. With a smaller and lighter design, the TAGS7 was used for its ability to conform to the aircraft's size restrictions, with the added benefit of upgraded performance capabilities. Two surveys were performed with this aircraft and gravimeter, one in April and one in August to September of 2017. Initial results indicate that the high-gain, fast response of the Centaur autopilot (optimized for flights without passengers), coupled with the full-force feedback sensor of the TAGS7, provides superior performance in all conditions, and

  4. Benchmarking U.S. Small Wind Costs with the Distributed Wind Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Poehlman, Eric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-10-04

    The objective of this report is to benchmark costs for small wind projects installed in the United States using a distributed wind taxonomy. Consequently, this report is a starting point to help expand the U.S. distributed wind market by informing potential areas for small wind cost-reduction opportunities and providing a benchmark to track future small wind cost-reduction progress.

  5. Wind power development field test project at Aoyama Heights, Aoyama-cho. Detailed wind characteristics survey; Aoyamacho Aoyama Kogen ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Aoyama Heights, Aoyama-cho, Naga-gun, Mie Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 5.3m/s and the maximum wind speed in the period was 32m/s. Winds came prevalently from WNW (31.6%), and then from NW (16.8%), ESE (20.9%), and E (9.9%). The wind axis was in the direction of WNW-ESE, and the total wind direction occurrence rate was 89.0%. Turbulence intensity was 0.25 at wind speed 2.0m/s or more and 0.23 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 70-84% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  6. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  7. 75 FR 47301 - Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC...

    Science.gov (United States)

    2010-08-05

    ...- 000; EG10-34-000; EG10-34-000; EG10-35-000; EG10-36-000; EG10-37-000; EG10-38-000] Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC; Wessington Wind Energy Center, LLC; Juniper Canyon Wind Power LLC; Loraine Windpark Project, LLC; White Oak Energy LLC; Meadow...

  8. Global Climate Change Pilot Course Project

    Science.gov (United States)

    Schuenemann, K. C.; Wagner, R.

    2011-12-01

    In fall 2011 a pilot course on "Global Climate Change" is being offered, which has been proposed to educate urban, diverse, undergraduate students about climate change at the introductory level. The course has been approved to fulfill two general college requirements, a natural sciences requirement that focuses on the scientific method, as well as a global diversity requirement. This course presents the science behind global climate change from an Earth systems and atmospheric science perspective. These concepts then provide the basis to explore the effect of global warming on regions throughout the world. Climate change has been taught as a sub-topic in other courses in the past solely using scientific concepts, with little success in altering the climate change misconceptions of the students. This pilot course will see if new, innovative projects described below can make more of an impact on the students' views of climate change. Results of the successes or failures of these projects will be reported, as well as results of a pre- and post-course questionnaire on climate change given to students taking the course. Students in the class will pair off and choose a global region or country that they will research, write papers on, and then represent in four class discussions spaced throughout the semester. The first report will include details on the current climate of their region and how the climate shapes that region's society and culture. The second report will discuss how that region is contributing to climate change and/or sequestering greenhouse gases. Thirdly, students will discuss observed and predicted changes in that region's climate and what impact it has had, and could have, on their society. Lastly, students will report on what role their region has played in mitigating climate change, any policies their region may have implemented, and how their region can or cannot adapt to future climate changes. They will also try to get a feel for the region

  9. Wind Power Today: 2000 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, W.

    2001-05-08

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry.

  10. Collaborative decision-making on wind power projects based on AHP method

    Science.gov (United States)

    Badea, A.; Proştean, G.; Tămăşilă, M.; Vârtosu, A.

    2017-01-01

    The complexity of projects implementation in Renewable Energy Sources (RES) requires finding collaborative alliances between suppliers and project developers in RES. Links activities in supply chain in RES, respectively, transportation of heavy components, processing orders to purchase quality raw materials, storage and materials handling, packaging, and other complex activities requiring a logistics system collaboratively to be permanently dimensioned properly selected and monitored. Requirements imposed by stringency of wind power energy projects implementation inevitably involves constraints in infrastructure, implementation and logistics. Thus, following an extensive research in RES project, to eliminate these constraints were identified alternative collaboration to provide feasible solutions on different levels of performance. The paper presents a critical analysis of different collaboration alternatives in supply chain for RES projects, selecting the ones most suitable for particular situations by using decision-making method Analytic Hierarchy Process (AHP). The role of AHP method was to formulate a decision model by which can be establish the collaboration alternative choice through mathematical calculation to reduce the impact created by constraints encountered. The solution provided through AHP provides a framework for detecting optimal alternative collaboration between suppliers and project developers in RES and avoids some breaks in the chain by resizing safety buffers for leveling orders in RES projects.

  11. Wind farm design optimization

    Energy Technology Data Exchange (ETDEWEB)

    Carreau, Michel; Morgenroth, Michael; Belashov, Oleg; Mdimagh, Asma; Hertz, Alain; Marcotte, Odile

    2010-09-15

    Innovative numerical computer tools have been developed to streamline the estimation, the design process and to optimize the Wind Farm Design with respect to the overall return on investment. The optimization engine can find the collector system layout automatically which provide a powerful tool to quickly study various alternative taking into account more precisely various constraints or factors that previously would have been too costly to analyze in details with precision. Our Wind Farm Tools have evolved through numerous projects and created value for our clients yielding Wind Farm projects with projected higher returns.

  12. 78 FR 71645 - Pilot Project for Tribal Jurisdiction over Crimes of Domestic Violence

    Science.gov (United States)

    2013-11-29

    ...This final notice establishes procedures for Indian tribes to request designation as participating tribes under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, under the voluntary pilot project described in the Violence Against Women Reauthorization Act; establishes procedures for the Attorney General to act on such requests; and solicits such requests from Indian tribes.

  13. Cloud County Community College Wind Energy Technology Project and Renewable Energy Center of Excellence

    Energy Technology Data Exchange (ETDEWEB)

    Graham, Bruce [Cloud County Community College, Concordia, KS (United States)

    2016-02-26

    Cloud County Community College's (CCCC) Wind Energy Technology (WET) program is a leader in the renewable energy movement across Kansas and the USA. The field of renewable energy is a growing industry which continues to experience high demand for career opportunities. This CCCC/DOE project entailed two phases: 1) the installation of two Northwind 100 wind turbines, and 2) the continued development of the WET program curriculum, including enhancement of the CCCC Blade Repair Certificate program. This report provides a technical account of the total work performed, and is a comprehensive description of the results achieved.

  14. Tall towers for large wind turbines. Report from Vindforsk project V-342

    Energy Technology Data Exchange (ETDEWEB)

    Engstroem, Staffan; Lyrner, Tomas; Hassanzadeh, Manouchehr; Stalin, Thomas; Johansson, John

    2010-07-15

    The general rule of thumb has been to furnish a wind turbine with a tower as tall as the turbine diameter, with deviations downwards for high wind speed sites. In this report the statement is questioned, with special emphasis for wind turbines sited in forests. The aim of this project was to propose and calculate candidate types of tall towers for on-shore wind turbines in the 3 - 5 MW range, with special reference to siting in forests with a representative wind shear. During the project this scope has been more precisely defined to study 3 and 5 MW wind turbines with hub heights of 80 - 175 meters featuring the following tower solutions: 1. Steel shell tower designed in a conventional way with flanges and both longitudinal and transverse welds. 2. Steel shell tower with bolted friction joints only. 3. Concrete tower with pretensioned steel tendons. 4. Hybrid tower with a lower concrete part and an upper part built as a conventional steel shell. 5. Lattice tower. 6. Wooden tower. During the execution of the project the design of a total of 42 towers was outlined and calculated. Today the welded steel shell tower dominates the wind turbine market. Larger turbines and higher hub heights result in larger optimal tower base diameters. For the road transportation there are limitations due to bridges and other obstacles. In Sweden the limit for transports with special permits in general maximizes the diameter to 4,5 metres. To some extent it is still technically possible to build towers with a less than optimal diameter, but due to the high mass and the large wall thickness they tend to be uneconomical in comparison with other alternatives above a hub height of roughly 100 metres. In this report welded steel shell towers were outlined for 3 MW turbines up to a hub height of 150 metres whereas the limit for the 5 MW towers was 100 metres. When diameter restrictions tend to make welded towers uneconomical, the next logical choice is steel shell towers with bolted friction

  15. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Baldock, Nick [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Sevilla, Fernando [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Redfern, Robin [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Storey, Alexis [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Kempenaar, Anton [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Elkinton, Chris [Garrad Hassan America, Inc., San Diego, CA (United States)

    2014-12-19

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model

  16. Fundamentals for remote structural health monitoring of wind turbine blades - a pre-project

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, B.F.; Lading, L.; Sendrup, P. (and others)

    2002-05-01

    This summary-report describes the results of a pre-project that has the aim of establishing the basic technical knowledge to evaluate whether remote surveillance of the rotor blades of large off-shore wind turbines has technical and economical potential. A cost-benefit analysis was developed, showing that it is economically attractive to use sensors embedded in the blade. Specific technical requirements were defined for the sensors capability to detect the most important damage types in wind turbine blades. Three different sensor types were selected for use in laboratory experiments and full-scale tests of a wind turbine blade developing damage: 1) detection of stress wave emission by acoustic emission, 2) measurement of modal shape changes by accelerometers and 3) measurement of crack opening of adhesive joint by a fibre optics micro-bend displacement transducer that was developed in the project. All types of sensor approaches were found to work satisfactory. The techniques were found to complement each other: Acoustic emission has the capability of detecting very small damages and can be used for locating the spatial position and size of evolving damages. The fibre optics displacement transducer was found to work well for detecting adhesive failure. Modelling work shows that damage in a wind turbine blade causes a significant change in the modal shape when the damage is in the order of 0.5-1 m. Rough estimates of the prices of complete sensor systems were made. The system based on acoustic emission was the most expensive and the one based on accelerometers was the cheapest. NDT methods (ultrasound scanning and X-ray inspection) were found to be useful for verification of hidden damage. Details of the work are described in annexes. (au)

  17. Wind energy sector in British Columbia

    International Nuclear Information System (INIS)

    2010-01-01

    British Columbia (BC) possesses significant wind energy resources, and many wind energy projects are currently in the planning phase or are already under construction. Wind power policies in the province have been designed to ensure the secure and orderly development of the wind power industry. Policies in the province include a 10-year exemption from participation rents for new projects as well as a policy that has established the maximum permissible noise levels for wind farms located near residential properties. BC's wind power development plan forms part of the province's aim to become electricity self-sufficient by 2016 while ensuring that clean or renewable energy generation accounts for at least 90 per cent of total generation. This guide provided an outline of the province's wind energy sector, and provided a listing of selected wind power operators. Details of new wind power projects were also presented. 11 fig.

  18. DOE/NREL supported wind energy activities in Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy related projects which are underway in Indonesia. The first is a USAID/Winrock Wind for Island and Nongovernmental Development (WIND) project. The objectives of this project are to train local nongovernmental organizations (NGOs) in the siting, installation, operation, and maintenance of small wind turbines. Then to install up to 20 wind systems to provide electric power for productive end uses while creating micro-enterprises which will generate enough revenue to sustain the wind energy systems. The second project is a joint Community Power Corporation/PLN (Indonesian National Electric Utility) case study of hybrid power systems in village settings. The objective is to evaluate the economic viability of various hybrid power options for several different situations involving wind/photovoltaics/batteries/diesel. The third project is a World Bank/PLN preliminary market assessment for wind/diesel hybrid systems. The objective is to estimate the size of the total potential market for wind/diesel hybrid power systems in Indonesia. The study will examine both wind retrofits to existing diesel mini-grids and new wind-diesel plants in currently unelectrified villages.

  19. Wind turbines in your environment? Wind turbines and economic aspects

    International Nuclear Information System (INIS)

    2002-02-01

    The wind energy industry has demonstrated its maturity and technical reliability. Because it will play an increasing role on the power generation market, the question of the cost and profitability of the wind energy has become of prime importance. Two main traps must be avoided: the first should be to deny the present and future economical interest of wind energy because of its supplementary cost with respect to conventional power generation techniques. The second trap should be to underestimate the economical progresses that wind energy must carry on to ensure its large scale development. Therefore, some advantageous pricing and regulatory conditions are necessary to allow the development of this emerging energy source. This document presents: the cost of a wind power project (initial investment, financial incentives); the profitability of a project (cost of a kWh of wind power origin, retail price, warranty of power supply capacity, indirect environmental costs, value of decentralized production); economical interest of wind power (energy efficiency, employment, financial advantages for the local economy); and who are the investors. (J.S.)

  20. New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)

    Energy Technology Data Exchange (ETDEWEB)

    Grace, R. C.; Gifford, J.

    2010-01-01

    Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region. In addition to regional updates, Issue #5 offers an interview with Angus King, former governor of Maine and co-founder of Independence Wind.

  1. Dynamic Models for Wind Turbines and Wind Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M.; Santoso, S.

    2011-10-01

    The primary objective of this report was to develop universal manufacturer-independent wind turbine and wind power plant models that can be shared, used, and improved without any restrictions by project developers, manufacturers, and engineers. Manufacturer-specific models of wind turbines are favored for use in wind power interconnection studies. While they are detailed and accurate, their usages are limited to the terms of the non-disclosure agreement, thus stifling model sharing. The primary objective of the work proposed is to develop universal manufacturer-independent wind power plant models that can be shared, used, and improved without any restrictions by project developers, manufacturers, and engineers. Each of these models includes representations of general turbine aerodynamics, the mechanical drive-train, and the electrical characteristics of the generator and converter, as well as the control systems typically used. To determine how realistic model performance is, the performance of one of the models (doubly-fed induction generator model) has been validated using real-world wind power plant data. This work also documents selected applications of these models.

  2. A methodology for assessment of road structures for the PBS pilot project in South Africa

    CSIR Research Space (South Africa)

    Nordengen, Paul A

    2016-11-01

    Full Text Available This paper describes the methodology that is being used for the performance assessment of PBS vehicles in terms of road structures as part of the PBS pilot project in South Africa. The assessment approach has evolved from the standard “bridge...

  3. Optimization of the cumulative risk assessment of pesticides and biocides using computational techniques: Pilot project

    DEFF Research Database (Denmark)

    Jonsdottir, Svava Osk; Reffstrup, Trine Klein; Petersen, Annette

    This pilot project is intended as the first step in developing a computational strategy to assist in refining methods for higher tier cumulative and aggregate risk assessment of exposure to mixture of pesticides and biocides. For this purpose, physiologically based toxicokinetic (PBTK) models were...

  4. The Citizenship Safety Project: a pilot study.

    Science.gov (United States)

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  5. Wind Power Today: Wind Energy Program Highlights 2001

    Energy Technology Data Exchange (ETDEWEB)

    2002-05-01

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program accomplishments for the previous year. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry. This 2001 edition of Wind Power Today also includes discussions about wind industry growth in 2001, how DOE is taking advantage of low wind speed regions through advancing technology, and distributed applications for small wind turbines.

  6. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and substainability analysis[CDM=Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Ringius, L.; Grohnheit, P.E.; Nielsen, L.H.; Olivier, A.L.; Painuly, J.; Villavicencio, A.

    2002-12-01

    The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment and development - that is, baseline development, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends methodologies for and approaches to baseline development. To present the application and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana, Egypt- is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between the lowest (0.5496 tCO2/MWh) and the highest emission rate (0.6868 tCO{sub 2}/MWh) estimated in accordance with these three standardized approaches to baseline development according to the Marrakesh Accord. This difference in emission factors comes about partly as a result of including hydroelectric power in the baseline scenario. Hydroelectric resources constitute around 21% of the generation capacity in Egypt, and, if excluding hydropower, the difference between the lowest and the highest baseline is reduced to 18%. Furthermore, since the two variations of the 'historical' baseline option examined result in the highest and the lowest baselines, by disregarding this baseline option altogether the difference between the lowest and the highest is reduced to 16%. The ES3-model, which the Systems Analysis Department at Risoe National Laboratory has developed, makes it possible for this report to explore the project-specific approach to baseline development in some detail. Based on quite disaggregated data on the Egyptian electricity system, including the wind

  7. Winds of change: First Nations in the supply chain

    International Nuclear Information System (INIS)

    Soulliere, Marc

    2011-01-01

    TWN Wind Power is a First Nations company which aims at providing First Nation communities with the opportunity to develop small wind power projects to produce energy without harming their environment. Through its work in energy production, the company creates jobs and revenues in addition to protecting First Nations against electricity rate increases. The objective of this paper is to present a successful wind turbine project. This Band school wind turbine project consisted of installing a 5 kW wind turbine at a school in Keremeos and educating students in renewable energies field. The project was planned to be completed in October 2011. In addition to this project, TWN Wind Power has also completed other projects in Oklahoma, South Dakota, British Columbia, Nova Scotia and Saskatchewan successfully. This presentation highlighted the work carried out by TWN Wind Power to develop wind energy projects within First Nations communities.

  8. Winds of change: First Nations in the supply chain

    Energy Technology Data Exchange (ETDEWEB)

    Soulliere, Marc [TWN Wind Power Inc. (Canada)

    2011-07-01

    TWN Wind Power is a First Nations company which aims at providing First Nation communities with the opportunity to develop small wind power projects to produce energy without harming their environment. Through its work in energy production, the company creates jobs and revenues in addition to protecting First Nations against electricity rate increases. The objective of this paper is to present a successful wind turbine project. This Band school wind turbine project consisted of installing a 5 kW wind turbine at a school in Keremeos and educating students in renewable energies field. The project was planned to be completed in October 2011. In addition to this project, TWN Wind Power has also completed other projects in Oklahoma, South Dakota, British Columbia, Nova Scotia and Saskatchewan successfully. This presentation highlighted the work carried out by TWN Wind Power to develop wind energy projects within First Nations communities.

  9. 2008 WIND TECHNOLOGIES MARKET REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H.; Bolinger, Mark; Barbose, G.; Mills, A.; Rosa, A.; Porter, K.; Fink, S.; Tegen, S.; Musial, W.; Oteri, F.; Heimiller, D.; Rberts, B.; Belyeu, K.; Stimmel, R.

    2009-07-15

    The U.S. wind industry experienced a banner year in 2008, again surpassing even optimistic growth projections from years past. At the same time, the last year has been one of upheaval, with the global financial crisis impacting near-term growth prospects for the wind industry, and with federal policy changes enacted to push the industry towards continued aggressive expansion. This rapid pace of development has made it difficult to keep up with trends in the marketplace. Yet, the need for timely, objective information on the industry and its progress has never been greater. This report - the third of an ongoing annual series - attempts to meet this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2008. As with previous editions, this report begins with an overview of key wind power installation-related trends: trends in wind capacity growth in the U.S., how that growth compares to other countries and generation sources, the amount and percentage of wind in individual states and serving specific utilities, and the quantity of proposed wind capacity in various interconnection queues in the United States. Next, the report covers an array of wind industry trends, including developments in turbine manufacturer market share, manufacturing and supply-chain investments, wind turbine and wind project size, project financing developments, and trends among wind power developers, project owners, and power purchasers. The report then turns to a discussion of wind project price, cost, and performance trends. In so doing, it reviews the price of wind power in the United States, and how those prices compare to the cost of fossil-fueled generation, as represented by wholesale power prices. It also describes trends in installed wind project costs, wind turbine transaction prices, project performance, and operations and maintenance expenses. Next, the report examines other policy and market factors impacting the

  10. Distributed Wind Energy in Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, John [Boise State Univ., ID (United States); Johnson, Kathryn [Colorado School of Mines, Golden, CO (United States); Haynes, Todd [Boise State Univ., ID (United States); Seifert, Gary [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2009-01-31

    This project is a research and development program aimed at furthering distributed wind technology. In particular, this project addresses some of the barriers to distributed wind energy utilization in Idaho.

  11. Appendix I3-1 to Wind HUI Initiative 1: AWST-WindNET-Phase 1 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Zack

    2012-07-15

    This report is an appendix to the Hawaii WindHUI efforts to develop and operationalize short-term wind forecasting and wind ramp event forecasting capabilities. The report summarizes the WindNET Phase 1 efforts on the Big Island of Hawaii and includes descriptions of modeling methodologies, use of field validation data, results and recommendations. The objective of the WindNET project was to investigate the improvement that could be obtained in short-term wind power forecasting for wind generation facilities operating on the island grids operated by Hawaiian Electric Companies through the use of atmospheric sensors deployed at targeted locations. WindNET is envisioned as a multiphase project that will address the short-term wind forecasting issues of all of the wind generation facilities on the all of the Hawaiian Electric Companies' island grid systems. The first phase of the WindNET effort (referred to as WindNET-1) was focused on the wind generation facilities on the Big Island of Hawaii. With complex terrain and marine environment, emphasis was on improving the 0 to 6 hour forecasts of wind power ramps and periods of wind variability, with a particular interest in the intra-hour (0-1 hour) look-ahead period. The WindNET project was built upon a foundation that was constructed with the results from a previously completed observation targeting study for the Big Island that was conducted as part of a project supported by the National Renewable Energy Laboratory (NREL) and interactions with the western utilities. The observational targeting study provided guidance on which variables to measure and at what locations to get the most improvement in forecast performance at a target forecast site. The recommendations of the observation targeting study were based on the application two techniques: (1) an objective method called ensemble sensitivity analysis (ESA) (Ancell and Hakim, 2007; Torn and Hakim, 2008; Zack et al, 2010); and (2) a subjective method based on a

  12. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  13. Assessment of the Lillgrund Windfarm, Power Performance and Wake Effects. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Dahlberg, Jan-Aake (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-06-15

    In this report, an assessment of the power performance of individual turbines, as well as for the whole wind farm, Lillgrund, is presented. By using the nearby meteorological mast, a power performance assessment, in line with international standards, has been carried out for three turbines located close to the met mast, as well as for the whole farm. The derived power curves for the single turbines are almost identical, and slightly better than, the power curves given in WindPro. The assessment of the power performance of the whole wind farm resulted in an average power curve that is significantly lower than the power curve for an undisturbed turbine. The overall energy efficiency of the farm, calculated from the measured wind farm power curve and assuming a Rayleigh distributed wind speed with an annual average value of 8.0 m/s, gives an efficiency value of about 77%. The losses are relatively high, which is not surprising, for such a dense wind farm configuration. The Lillgrund wind farm is considered to have a very dense configuration and it is, therefore, of great interest to investigate how shading effects (wake effects) will influence the production. The main objective of the project has been to analyze the power output of the whole wind farm for different wind directions and wind speeds and thus identify and quantify the wake effects. Shading effects are defined as the power ratio between the power output of one or more selected object turbines and the power levels of one or more reference turbines, located up front. Shading effects have been identified for a number of cases and can be clearly demonstrated. Significant wake effects occur when the wind is blowing along a row of turbines. The maximum peak loss occurs for the second turbine in the row and is, for inter row spacing of 4.4xD, typically 70%, and for row spacing of 3.3xD, typically 80%. One assumption that has been adopted is that power reduction only occurs for production below rated wind speeds

  14. Monitoring pilot projects on bored tunnelling : The Second Heinenoord Tunnel and the Botlek Rail Tunnel

    NARCIS (Netherlands)

    Bakker, K.J.; De Boer, F.; Admiraal, J.B.M.; Van Jaarsveld, E.P.

    1999-01-01

    Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be

  15. AD-1 with research pilot Richard E. Gray

    Science.gov (United States)

    1982-01-01

    1981/1982. Richard E. Gray was born March 11, 1945 in Newport News, Virginia; he died on November 8, 1982 at Edwards, California, in a T-37 spin accident. The Ames-Dryden-1 (AD-1) aircraft was designed to investigate the concept of an oblique (pivoting) wing. The wing could be rotated on its center pivot, so that it could be set at its most efficient angle for the speed at which the aircraft was flying. NASA Ames Research Center Aeronautical Engineer Robert T. Jones conceived the idea of an oblique wing. His wind tunnel studies at Ames (Moffett Field, CA) indicated that an oblique wing design on a supersonic transport might achieve twice the fuel economy of an aircraft with conventional wings. The oblique wing on the AD-1 pivoted about the fuselage, remaining perpendicular to it during slow flight and rotating to angles of up to 60 degrees as aircraft speed increased. Analytical and wind tunnel studiesthat Jones conducted at Ames indicated that a transport-sized oblique-wing aircraft flying at speeds of up to Mach 1.4 (1.4 times the speed of sound) would have substantially better aerodynamic performance than aircraft with conventional wings. The AD-1 structure allowed the project to complete all of its technical objectives. The type of low-speed, low-cost vehicle - as expected - exhibited aeroelastic and pitch-roll-coupling effects that contributed to poor handling at sweep angles above 45 degrees. The fiberglass structure limited the wing stiffness that would have improved the handling qualities. Thus, after completion of the AD-1 project, there was still a need for a transonic oblique-wing research aircraft to assess the effects of compressibility, evaluate a more representative structure, and analyze flight performance at transonic speeds (those on either side of the speed of sound). The aircraft was delivered to the Dryden Flight Research Center, Edwards, CA, in March 1979 and its first flight was on December 21, 1979. Piloting the aircraft on that flight, as well

  16. Pilot project for implantation of the National Commission on Radiation Protection and Dosimetry of CONTER, Brazil

    International Nuclear Information System (INIS)

    Padilha Filho, L.G.; Santos, J.R.A.; Dmitruk, P.P.; Souza, J.H.C.; Hamann, J.H.; Soboll, D.S.

    2017-01-01

    This work presents the pilot project of the National Council of Technicians and Technologists in Radiology (CONTER), which created the National Commission on Radioprotection and Dosimetry (CNRD), in order to develop a radioprotection culture for professionals in radiographic techniques

  17. Bigger and better wind tech

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    This article briefly describes two new wind energy projects. One is the Portland Wind Commercialisation Project in the Portland district of south west Victoria, for which Pacific Hydro Limited was granted Major Project Facilitation Status. The Project consists of a staged development during 2001-2002 of four wind farms in the Portland district on the southwest coast of Victoria with total investment being between $230 million and $250 million. Generation capacity will be between 140 and 150 MW using over 100 wind driven turbines. It is estimated that the annual production of electricity from this Project will be in excess of 500 G Wh which represents an abatement of more than 500,000 tonnes of CO 2 per annum. This is around 5% of Australia's 9,500 G Wh target for renewables. If developed, the project will generate approximately 15 permanent new jobs as well as employment for some 80 during the construction phase and will be subject to normal environmental controls. The Australian industry participation for the Project is envisaged to be in excess of 90% potentially creating up to 500 indirect manufacturing jobs, which may result in substantial economic growth in the region and the emerging renewable energy market. Another company, Western Power, has launched a new renewable energy storage system at Denham, Western Australia, with wind turbine-flywheel hybrid generating system. It is estimated that this project could greatly improve the effectiveness of wind energy for power generation in remote location all over the world

  18. Wind energy - the right approach

    International Nuclear Information System (INIS)

    Wade-Smith, R.; Pitcher, K.; British Wind Energy Association, London; European Wind Energy Association)

    1992-01-01

    The improved climate afforded by the Electricity Act 1989 and in particular the so-called non-fossil fuel obligation (NFFO) has brought about a significant number of renewable energy proposals and in particular wind power projects. The 1990 Order included nine wind projects - five windfarms ranging from four to twenty four wind turbines and four single turbine proposals. The purpose of this article is to help the reader have a greater understanding of some of the planning issues concerned with a wind power project (in the UK), and the basis upon which obstacles can be overcome on the road to achieving planning approval. (author)

  19. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  20. Environmental and Social Impacts Assessment and Public Acceptability of a Wind Power Project in Korea

    Science.gov (United States)

    CHO, K.; Shin, K. H.; Kim, T. Y.; Seo, A.

    2017-12-01

    Total renewable energy production in Korea is 13,062,000 Ton of Oil Equivalent (TOE) as of 2015. Renewable energy accounts for 4.54% of the total primary energy production, and wind energy makes up 2.17% of the renewable energy production in Korea. Meanwhile, it aims to expand the supply of the wind energy in renewable energy production up to 18.2% by 2035. In Korea, where 64% of its territory is mountain, onshore wind power has shown problems such as nature destruction, noise, tidal damage and landscape destruction. In this regard, offshore wind power has claimed an attention as the alternative of the onshore project. Although it effectively makes up such disadvantages of the onshore wind power, there is still an unsettled problem of the public conflict. For instance, the case of offshore wind power generation in Jeju Island in Korea is suffering serious conflict due to the opposition of nearby residents and fishermen. The lacks of communication, community benefit plans, and compensation for fishermen are the reasons for the opposition. Above all, little consideration on public acceptability in the process of the development project is the fundamental reason. In short, the conflicts triggered in Korea are not caused by the impacts on natural or living environment, but rather by the lack of communication. This study suggests participatory technology impact assessment and a plan for community benefits as a methodology to establish a system for agreement formation on the offshore wind power. Participatory technology impact assessment is a model emphasizing on citizen deliberation. Consensus conference and scenario workshop can represent the assessment. Whereas the compensation prepared for the specific resident group targets only a few stakeholders, the plan prepared by the committee of the residents enhances the public acceptance by returning a development profit to all residents in a broader scope. The results of participant's evaluation on the scenario workshop in

  1. Bats in Dutch offshore wind farms in autumn 2012

    NARCIS (Netherlands)

    Lagerveld, S.; Jonge Poerink, B.; Haselager, R.; Verdaat, J.P.

    2014-01-01

    In the autumn of 2012, we conducted a pilot study with ultrasonic recorders to assess the occurrence of bats over the North Sea. At Offshore Wind Farm Egmond aan Zee (OWEZ) a recorder was installed at the meteorological mast and at Princess Amalia Wind Farm (PAWP) a recorder was attached to the

  2. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  3. An Audit Learning Experience: A Pilot Project through Cooperation with a Third Sector Organization

    Science.gov (United States)

    Tonge, Richard; Willett, Caroline

    2012-01-01

    This paper is a critical evaluation of a pilot cooperative education project conducted with a charitable organization in the UK. An action research approach was adopted. Final level students who are studying auditing have had the opportunity to apply the knowledge and skills they are developing through their studies to a real-life situation in the…

  4. An inplementation strategy for the utilization of wind energy in Estonia. Phase 1: Pre-feasibility study and project identification. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This report presents the results of a pre-feasibility and project identification study with the purpose of investigating the possibilities for wind energy in Estonia and to recommend on possible actions, as outlined in Letters of Interest from the Estonian Ministries of Economy and Environment in 1995. Wind as source of energy in Estonia appears not yet to have been analyzed in detail. Available data indicates that wind can constitute a viable domestic source of energy, as average wind speeds of about 6 m/s (at 10 m) are reported at many coastal regions of Estonia. With state-of-the-art wind energy technology this means cost of wind produced electricity about 0.7-0.8 EEK/kWh - comparable to the cost of electricity from a modern coal-fired power plant. Two types of grids exist in these regions: On the mainland and on islands with sea cable grid connected wind turbines can be implemented. On islands without sea cable wind turbines can be connected to the diesel powered local grids. As a first step it is proposed to undertake the detailed planning and feasibility study of grid connected wind energy demonstrations in the framework of the Danish-Estonian country collaboration agreement. If the decision is made to implement this wind energy demonstration project, a certain proportion of grant money should be allocated for the demonstration. Subsequent steps in the Danish-Estonian country collaboration agreement should include the detailed planning and feasibility studies of autonomous wind energy demonstration and the associated capacity building. (EG)

  5. Code of Conduct for wind-power projects - Feasibility study; Code of Conduct fuer windkraftprojekte. Machbarkeitsstudie - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2009-02-15

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  6. 75 FR 23666 - Huron-Manistee National Forests, White Pines Wind Farm Project, Mason County, MI

    Science.gov (United States)

    2010-05-04

    ... DEPARTMENT OF AGRICULTURE Forest Service Huron-Manistee National Forests, White Pines Wind Farm Project, Mason County, MI AGENCY: Forest Service, USDA. ACTION: Cancellation Notice of notice of intent to prepare an environmental impact statement. SUMMARY: The Forest Service proposed to prepare an...

  7. Wind Generation on Winnebago Tribal Lands

    Energy Technology Data Exchange (ETDEWEB)

    Multiple

    2009-09-30

    The Winnebago Wind Energy Study evaluated facility-scale, community-scale and commercial-scale wind development on Winnebago Tribal lands in northeastern Nebraska. The Winnebago Tribe of Nebraska has been pursuing wind development in various forms for nearly ten years. Wind monitoring utilizing loaned met towers from NREL took place during two different periods. From April 2001 to April 2002, a 20-meter met tower monitored wind data at the WinnaVegas Casino on the far eastern edge of the Winnebago reservation in Iowa. In late 2006, a 50-meter tower was installed, and subsequently monitored wind data at the WinnaVegas site from late 2006 through late 2008. Significant challenges with the NREL wind monitoring equipment limited the availability of valid data, but based on the available data, average wind speeds between 13.6 – 14.3 miles were indicated, reflecting a 2+/3- wind class. Based on the anticipated cost of energy produced by a WinnaVegas wind turbine, and the utility policies and rates in place at this time, a WinnaVegas wind project did not appear to make economic sense. However, if substantial grant funding were available for energy equipment at the casino site, and if either Woodbury REC backup rates were lower, or NIPCO was willing to pay more for wind power, a WinnaVegas wind project could be feasible. With funding remaining in the DOE-funded project budget,a number of other possible wind project locations on the Winnebago reservation were considered. in early 2009, a NPPD-owned met tower was installed at a site identified in the study pursuant to a verbal agreement with NPPD which provided for power from any ultimately developed project on the Western Winnebago site to be sold to NPPD. Results from the first seven months of wind monitoring at the Western Winnebago site were as expected at just over 7 meters per second at 50-meter tower height, reflecting Class 4 wind speeds, adequate for commercial development. If wind data collected in the remaining

  8. Cancellation of a wind farm project in an area covered by the Mountain law

    International Nuclear Information System (INIS)

    Roux, Gilles

    2017-01-01

    In April 2017 the court of appeal of Marseille (South-East France) had to deal with the cancellation request of a prefectorial order authorizing the building of 9 wind turbines. The court, after appraisal of the quality of the area in concern and of the landscape impacts this project should generate, considered that the project would effectively strongly impact the natural areas and thus has ordered the cancellation of the prefectorial order. This paper presents the explanatory statement and the conclusions of the judgement

  9. Wind Power Meteorology

    DEFF Research Database (Denmark)

    Lundtang Petersen, Erik; Mortensen, Niels Gylling; Landberg, Lars

    Wind power meteorology has evolved as an applied science, firmly founded on boundary-layer meteorology, but with strong links to climatology and geography. It concerns itself with three main areas: siting of wind turbines, regional wind resource assessment, and short-term prediction of the wind...... resource. The history, status and perspectives of wind power meteorology are presented, with emphasis on physical considerations and on its practical application. Following a global view of the wind resource, the elements of boundary layer meteorology which are most important for wind energy are reviewed......: wind profiles and shear, turbulence and gust, and extreme winds. The data used in wind power meteorology stem mainly from three sources: onsite wind measurements, the synoptic networks, and the re-analysis projects. Wind climate analysis, wind resource estimation and siting further require a detailed...

  10. Wind: French revolutions

    International Nuclear Information System (INIS)

    Jones, C.

    2006-01-01

    Despite having the second best wind resources in Europe after the UK, the wind industry in France lags behind its European counterparts with just 6 W of installed wind capacity per person. The electricity market in France is dominated by the state-owned Electricite de France (EdF) and its nuclear power stations. However, smaller renewable generators are now in theory allowed access to the market and France has transposed the EU renewables directive into national law. The French governement has set a target of generating 10,000 MW of renewable capacity by 2010. The announcement of an increased feed-in tariff and the introduction of 'development zones' (ZDEs) which could allow fast-tracking of planning for wind projects are also expected to boost wind projects. But grid access and adminstrative burdens remain major barriers. In addition, French politicians and local authorities remain committed to nuclear, though encouraged by the European Commission, wind is beginning to gain acceptance; some 325 wind farms (representing 1557 MW of capacity) were approved between February 2004 and January 2005. France is now regarded by the international wind energy sector as a target market. One of France's leading independent wind developers and its only listed wind company, Theolia, is expected to be one of the major beneficiaries of the acceleration of activity in France, though other companies are keen to maximise the opportunities for wind. France currently has only one indigenous manufacturer of wind turbines, but foreign suppliers are winning orders

  11. A life cycle perspective on land use and project economics of electricity from wind and anaerobic digestion

    International Nuclear Information System (INIS)

    Ciliberti, Carlo; Jordaan, Sarah M.; Smith, Stephen V.; Spatari, Sabrina

    2016-01-01

    Feed-in tariffs and Renewable Portfolio Standards (RPS) are among the most prominent policies to address anthropogenic influence on climate change. Implementation of RPS favorably affects renewable energy supply and rural development while reducing the land available for meeting demand for food and feed resulting from global population growth. Even in the vast Great Plains of the United States, land requirements are primary considerations between increasing renewable energy capacity and food and feed production. This study applied life cycle assessment (LCA) and project economics to estimate and compare the land intensity and profitability of anaerobic digestion and wind energy projects in the Great Plains. The results show that significantly more energy and revenue can be generated per hectare of land using wind versus anaerobic digestion. Economically, the benefit-to-cost ratios of wind farms were almost twice as favorable as anaerobic digester facilities. Wind farms have consistent benefit-to-cost ratios of 2.15 while the anaerobic digester facilities benefit to cost ratios range from 1.2 to 1.25. Legislature changes to RPS could incentivize increasing the number of anaerobic digesters while also assisting in reversing the current trend of diminishing dairy farms while reducing climate change risks and creating new economic opportunities for renewable energy. - Highlights: • Wind 1160 GW h to 28,706 GW h between 2 and 129 ha. • AD 29 GW h to 393 GW h between 14 and 105 ha. • More energy and revenue can be generated per hectare using wind energy AD. • An ideal solution for dairy farmers may be an integrated solution • State legislature changes to RPS could incentivize increasing AD facilities.

  12. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-04-05

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm.

  13. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    International Nuclear Information System (INIS)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-01-01

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm

  14. Projets Pilotes Quebecois Portant sur L'Integration Scolaire aux Niveaux Pre-Scolaire et Primaire (Quebec Pilot Projects on Mainstreaming of Preschool and Primary-Level Schoolchildren).

    Science.gov (United States)

    Saint-Laurent, Lise; And Others

    1992-01-01

    This article synthesizes 55 Quebec (Canada) pilot projects on mainstreaming of pupils with learning disabilities, behavior disorders, physical or sensorial handicaps, or mental handicaps, at preschool and elementary levels. It focuses on extent of integration, interventions, training and support for teachers, and evaluation methodology used.…

  15. [Evaluation of 12 pilot projects to improve outpatient palliative care].

    Science.gov (United States)

    Schmidt-Wolf, G; Elsner, F; Lindena, G; Hilgers, R-D; Heussen, N; Rolke, R; Ostgathe, C; Radbruch, L

    2013-12-01

    With a priority programme the German Cancer Aid supported the development of quality-assured outpatient palliative care to cover the whole country. The 12 regional pilot projects funded with the aim to improve outpatient palliative care in different models and different frameworks were concurrently monitored and evaluated. The supported projects, starting and ending individually, documented all patients who were cared for using HOPE (Hospice and palliative care evaluation) and MIDOS (Minimal documentation system for palliative patients). Total data were analyzed for 3239 patients decriptively. In addition to the quantitative data the experiences of the projects were recorded in a number of workshops (2008, 2009, 2010, and 2012). In particular, the experiences reported in the final meeting in July 2012 were considered for this article as well as the final reports for the German Cancer Aid. In the quantitative evaluation 85.6% of 3239 palliative care patients had a cancer diagnosis. In all model projects the goal of a network with close cooperation of primary providers, social support, and outpatient and inpatient specialist services has been achieved. For all projects, the initial financing of the German Cancer Aid was extremely important, because contracts with health insurance funds were negotiated slowly, and could then be built on the experiences with the projects. The participants of the project-completion meeting emphasized the need to carry out a market analysis before starting palliative care organizations considering the different regional structures and target groups of patients. Education, training and continuing education programs contribute significantly to the network. A reliably funded coordination center/case management across all institutions is extremely important. © Georg Thieme Verlag KG Stuttgart · New York.

  16. 2015 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Electricity Markets and Policy Group; Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Electricity Markets and Policy Group; Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoen, Ben [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rand, Joe [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Porter, Kevin [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-08-03

    Annual wind power capacity additions in the United States surged in 2015 and are projected to continue at a rapid clip in the coming five years. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—having been extended for several years (though with a phase-down schedule, described further on pages 68-69), as well as a myriad of state-level policies. Wind additions are also being driven by improvements in the cost and performance of wind power technologies, yielding low power sales prices for utility, corporate, and other purchasers. At the same time, the prospects for growth beyond the current PTC cycle remain uncertain: growth could be blunted by declining federal tax support, expectations for low natural gas prices, and modest electricity demand growth. This annual report—now in its tenth year—provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation-related trends: trends in U.S. wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development; and the quantity of proposed wind power capacity in various interconnection queues in the United States. Next, the report covers an array of wind power industry trends: developments in turbine manufacturer market share; manufacturing and supply-chain developments; wind turbine and component imports into and exports from the United States; project financing developments; and trends among wind power project owners and power purchasers. The report then turns to a summary of wind turbine technology trends: turbine size, hub height, rotor diameter, specific power, and IEC Class. After that, the report discusses wind power performance, cost, and pricing trends. In so doing, it describes

  17. Wind power today

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This publication highlights initiatives of the US DOE`s Wind Energy Program. 1997 yearly activities are also very briefly summarized. The first article describes a 6-megawatt wind power plant installed in Vermont. Another article summarizes technical advances in wind turbine technology, and describes next-generation utility and small wind turbines in the planning stages. A village power project in Alaska using three 50-kilowatt turbines is described. Very brief summaries of the Federal Wind Energy Program and the National Wind Technology Center are also included in the publication.

  18. Tuno Knob Offshore Wind Farm

    International Nuclear Information System (INIS)

    Madsen, P.S.

    1996-01-01

    In 1995 Midtkraft Power Company built Denmark's second offshore wind farm as a demonstration project. The project purpose is first of all to investigate the environmental aspects of offshore wind energy. The two primary objects are to study the impact on bird life and to test different methods for predicting the visual effect. The wind farm consists of 10 pitch-regulated Vestas V39 500 kW wind turbines placed on box caisson foundations in a shallow water area 6 km east of Jutland. The project has been implemented successfully under a very narrow time schedule, and during the first 6 months in operation, the production has been approx. 30% higher than expected. (author)

  19. Wind turbines in Spain: la vuelta

    International Nuclear Information System (INIS)

    Jeanson, E.; Trancart, M.

    2000-01-01

    Ten years ago it was just the beginning of the wind industry in Spain. Today it takes the third place in Europe and the fourth in the world. The pilot regions are the Galicia and the Navarre. (A.L.B.)

  20. Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.

    Science.gov (United States)

    Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron

    2007-05-16

    To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.

  1. Economic and financial evaluation of the wind power project in Northeast region, Brazil; Avaliacao economico-financeira de projeto de central eolica na regiao nordeste

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Paulo Glicio da; Lima, Maria Angela de Queiroz; Melo Junior, Adalberto de Bastos [Companhia Hidro Eletrica do Sao Francisco (DFPL/CHESF), Recife, PE (Brazil). Div. de Planejamento Economico-Financeiro], Emails: paulogr@chesf.gov.br, angelq@chesf.gov.br, adalbert@chesf.gov.br; Bezerra, Pedro; Bittencourt, Rogerio [Companhia Hidro Eletrica do Sao Francisco (DEFA/CHESF), Recife, PE (Brazil). Div. de Projetos de Fontes Alternativas], E-mails: pbezerra@chesf.gov.br, rogeriob@chesf.gov.br

    2000-07-01

    This work deals with the analysis of economic and financial feasibility of using wind power in the Northeast region for electric power production, considering the new electricity sector model. The case study presented here refers to the design of a 50 MW Wind Farm in the region, based on preliminary data from wind collected in the period from 1993 to 1995. Some programs were used to evaluate this project: ALWIN, which estimates the potential for wind energy production; NEWAVE for determination operating marginal costs and generation plants values and ANAFIN, for economic and financial evaluation of the project, using scenarios, through the deterministic and probabilistic analysis.

  2. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  3. Lake Michigan Offshore Wind Feasibility Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Boezaart, Arnold [GVSU; Edmonson, James [GVSU; Standridge, Charles [GVSU; Pervez, Nahid [GVSU; Desai, Neel [University of Michigan; Williams, Bruce [University of Delaware; Clark, Aaron [GVSU; Zeitler, David [GVSU; Kendall, Scott [GVSU; Biddanda, Bopi [GVSU; Steinman, Alan [GVSU; Klatt, Brian [Michigan State University; Gehring, J. L. [Michigan State University; Walter, K. [Michigan State University; Nordman, Erik E. [GVSU

    2014-06-30

    The purpose of this project was to conduct the first comprehensive offshore wind assessment over Lake Michigan and to advance the body of knowledge needed to support future commercial wind energy development on the Great Lakes. The project involved evaluation and selection of emerging wind measurement technology and the permitting, installation and operation of the first mid-lake wind assessment meteorological (MET) facilities in Michigan’s Great Lakes. In addition, the project provided the first opportunity to deploy and field test floating LIDAR and Laser Wind Sensor (LWS) technology, and important research related equipment key to the sitting and permitting of future offshore wind energy development in accordance with public participation guidelines established by the Michigan Great Lakes Wind Council (GLOW). The project created opportunities for public dialogue and community education about offshore wind resource management and continued the dialogue to foster Great Lake wind resource utilization consistent with the focus of the GLOW Council. The technology proved to be effective, affordable, mobile, and the methods of data measurement accurate. The public benefited from a substantial increase in knowledge of the wind resources over Lake Michigan and gained insights about the potential environmental impacts of offshore wind turbine placements in the future. The unique first ever hub height wind resource assessment using LWS technology over water and development of related research data along with the permitting, sitting, and deployment of the WindSentinel MET buoy has captured public attention and has helped to increase awareness of the potential of future offshore wind energy development on the Great Lakes. Specifically, this project supported the acquisition and operation of a WindSentinel (WS) MET wind assessment buoy, and associated research for 549 days over multiple years at three locations on Lake Michigan. Four research objectives were defined for the

  4. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  5. Three-dimensional structure of the coronal magnetic field and the solar wind speed distribution projected on the photosphere in 1974

    International Nuclear Information System (INIS)

    Hakamada, K.

    1987-01-01

    Since the solar wind and coronal holes were relatively steady in 1974, the average distribution of the solar wind speed on the source surface and that of the line-of-sight component of the photospheric magnetic fields (B 1 ) can be constructed, with fair accuracy, by the superposed epoch analysis. The three-dimensional structure of the coronal magnetic fields is then computed from this average map of B 1 based on the potential model. The average distribution of the solar wind speed on the source surface, obtained from interplanetary scintillation observations, is then projected onto the photosphere along the open field lines in the corona. The high-speed regions thus projected are compared with the He I (1083 nm) coronal holes and are found to have a similar geometry. The results are also suggestive that the solar wind does not blow out uniformly from the vicinity of a coronal hole and that the speed is higher at the east side in that region than at the west side. The slower speed regions on the source surface have a sinusoidal structure in heliographic latitude-longitude coordinates and are similar to the brightness distribution of the K corona and the structure of closed field line regions projected onto the photosphere. copyrightAmerican Geophysical Union 1987

  6. Transitioning the GED[R] Mathematics Test to Computer with and without Accommodations: A Pilot Project

    Science.gov (United States)

    Patterson, Margaret Becker; Higgins, Jennifer; Bozman, Martha; Katz, Michael

    2011-01-01

    We conducted a pilot study to see how the GED Mathematics Test could be administered on computer with embedded accessibility tools. We examined test scores and test-taker experience. Nineteen GED test centers across five states and 216 randomly assigned GED Tests candidates participated in the project. GED candidates completed two GED mathematics…

  7. Influence on surfers wind conditions east of the new Hanstholm harbour/wind turbine project

    DEFF Research Database (Denmark)

    Larsen, Torben J.; Astrup, Poul

    on the lee side, which is an important area for wind and kite surfers. In this study, both changes in mean wind velocities as well as the turbulence level are investigated for the surf area between a location called ”Fish Factory” to the location called ”Hamburg”. The interesting wind speed interval is 8-16m...

  8. Modelling and Measuring Flow and Wind Turbine Wakes in Large Wind Farms Offshore

    DEFF Research Database (Denmark)

    Barthelmie, Rebecca Jane; Hansen, Kurt Schaldemose; Frandsen, Sten Tronæs

    2009-01-01

    power losses due to wakes and loads. The research presented is part of the EC-funded UpWind project, which aims to radically improve wind turbine and wind farm models in order to continue to improve the costs of wind energy. Reducing wake losses, or even reduce uncertainties in predicting power losses...

  9. Environmental screening report : Harrow Wind Farm

    International Nuclear Information System (INIS)

    2008-04-01

    AIM PowerGen Corporation is proposing to develop a wind energy project located on the northern shores of Lake Erie, Ontario called the Harrow Wind Farm. The wind energy project would consist of 24 wind turbines having a total capacity of 39.6 megawatts and comprise four small projects of six wind turbines each to be submitted to the standard offer program. The purpose of the project is to supply clean energy to the Ontario energy system using state-of-the-art wind energy technology. This report presented an environmental screening of the Harrow Wind Farm, as required by the Canadian Environmental Assessment Act and the Ontario Environmental Assessment Act. The report provided a detailed description of the Harrow Wind Farm location, optimization process and schedule as well as a detailed characterization of the natural and socio-economic environment. The report also provided a description of the regulatory agencies, as well as public and First Nations consultation activities. The effects on natural and socio-economic components were evaluated and an accidents and malfunction plan was also presented. Last, the report included a discussion of the effects of the environment on the Harrow Wind Farm; a summary of mitigation, impact management, and monitoring commitments of AIM PowerGen; and an overview of environmental advantages and disadvantages. It was concluded that the project design has benefited from several consultations with local authorities, lot owners and local residents, as well as federal and provincial agencies to ensure that environmental and social impacts are minimized while maximizing energy generation. refs., tabs., figs

  10. Understanding and controlling wind-induced vibrations of bridge cables: Results from the Femern Crossing research project

    DEFF Research Database (Denmark)

    Georgakis, Christos T.; Jakobsen, J. B.; Koss, Holger

    of the project has been the establishment of novel vibration mitigation schemes that could be readily, economically, and effectively implemented on a cable-supported bridge that might form part of the fixed link. In support of the proposed research, Femern A/S commissioned a new climatic wind tunnel, designed......Following the successful completion of the Storebælt and Øresund Crossings, the Danish Ministry of Transport appointed Femern A/S to be in charge of preparation, investigations and planning in relation to the establishment of a fixed link across the Fehmarnbelt. To further investigate the causes...... behind the cable vibrations that were observed on the cable-supported bridges forming part of the aforementioned crossings, Femern A/S commissioned a 5-year international collaborative research project, entitled “Understanding and controlling wind-induced vibrations of bridge cables”. The ultimate goal...

  11. Opportunities and challenges in assessing climate change impacts on wind energy-a critical comparison of wind speed projections in California

    International Nuclear Information System (INIS)

    Rasmussen, D J; Holloway, T; Nemet, G F

    2011-01-01

    Future climate change is expected to alter the spatial and temporal distribution of surface wind speeds (SWS), with associated impacts on electricity generation from wind energy. However, the predictions for the direction and magnitude of these changes hinge critically on the assessment methods used. Many climate change impact analyses, including those focused on wind energy, use individual climate models and/or statistical downscaling methods rooted in historical observations. Such studies may individually suggest an unrealistically high level of scientific certainty due to the absence of competing projections (over the same region, time period, etc). A new public data archive, the North American Regional Climate Change Assessment Program (NARCCAP), allows for a more comprehensive perspective on regional climate change impacts, here applied to three wind farm sites in California. We employ NARCCAP regional climate model data to estimate changes in SWS expected to occur in the mid-21st century at three wind farm regions: Altamont Pass, San Gorgonio Pass, and Tehachapi Pass. We examined trends in SWS magnitude and frequency using three different global/regional model pairs, focused on model evaluation, seasonal cycle, and long-term trends. Our results, while specific to California, highlight the opportunities and limitations in NARCCAP and other publicly available meteorological data sets for energy analysis, and the importance of using multiple models for climate change impact assessment. Although spatial patterns in current wind conditions agree fairly well among models and with NARR (North American Regional Reanalysis) data, results vary widely at our three sites of interest. This poor performance and model disagreement may be explained by complex topography, limited model resolution, and differences in model physics. Spatial trends and site-specific estimates of annual average changes (1980-2000 versus 2051-71) also differed widely across models. All models

  12. Wind Power Project Repowering: Financial Feasibility, Decision Drivers, and Supply Chain Effects

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Leventhal, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-12-01

    As wind power facilities age, project owners are faced with plant end of life decisions. This report is intended to inform policymakers and the business community regarding the history, opportunities, and challenges associated with plant end of life actions, in particular repowering. Specifically, the report details the history of repowering, examines the plant age at which repowering becomes financially attractive, and estimates the incremental market investment and supply chain demand that might result from future U.S. repowering activities.

  13. Coordinated Voltage Control in Offshore HVDC Connected Cluster of Wind Power Plants

    DEFF Research Database (Denmark)

    Sakamuri, Jayachandra N.; Rather, Zakir Hussain; Rimez, Johan

    2016-01-01

    This paper presents a coordinated voltage control scheme (CVCS) for a cluster of offshore wind power plants (OWPPs) connected to a VSC HVDC system. The primary control point of the proposed voltage control scheme is the introduced Pilot bus, which is having the highest short circuit capacity...... in the offshore AC grid. The developed CVCS comprehends an optimization algorithm, aiming for minimum active power losses in the offshore grid, to generate voltage reference to the Pilot bus. During steady state operation, the Pilot bus voltage is controlled by dispatching reactive power references to each wind...... turbine (WT) in the WPP cluster based on their available reactive power margin and network sensitivity based participation factors, which are derived from the dV/dQ sensitivity of a WT bus w.r.t the Pilot bus. This method leads to minimization of the risk of undesired effects, particularly overvoltage...

  14. Denmark Wind Energy Programme

    DEFF Research Database (Denmark)

    Shen, Wen Zhong

    2015-01-01

    In this chapter, a summary of some ongoing wind energy projects in Denmark is given. The research topics comprise computational model development, wind turbine (WT) design, low-noise airfoil and blade design, control device development, wake modelling and wind farm layout optimization....

  15. Framework for Testing the Effectiveness of Bat and Eagle Impact-Reduction Strategies at Wind Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin [National Renewable Energy Lab. (NREL), Golden, CO (United States); DeGeorge, Elise [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-13

    The objectives of this framework are to facilitate the study design and execution to test the effectiveness of bat and eagle impact-reduction strategies at wind energy sites. Through scientific field research, the wind industry and its partners can help determine if certain strategies are ready for operational deployment or require further development. This framework should be considered a living document to be improved upon as fatality-reduction technologies advance from the initial concepts to proven readiness (through project- and technology-specific testing) and as scientific field methods improve.

  16. Farmers’ Comparative Use Assessment Of Wind And Electric Pump For Irrigation

    Directory of Open Access Journals (Sweden)

    Diaba Kwasi Selassie

    2015-10-01

    Full Text Available Keta District provides one of the best wind regimes in Ghana and farming is the main occupation of most people in the communities of the district, notably the anloga community. A small size wind pump (1.6m rotor diameter is currently in operation in Anloga in the Keta District on pilot bases to verify its cost effectiveness compared with the hydro electric power technology. The high electricity tariff paid every month for power consumption deterred majority of the farmers using hydro electricity technology for pumping. A survey conducted revealed that out of about 50 farmers, only 29% engaged in the use of electric power for pumping whilst 69% still use the manual method. 2% of the farmers are using wind energy technology on pilot bases. Farmers in these coastal communities may have engaged in the use of wind energy for water pumping but for its high initial cost.

  17. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  18. Sixth international wind-diesel workshop

    International Nuclear Information System (INIS)

    1992-01-01

    At a workshop on hybrid wind/diesel power generation systems, papers were presented on international research programs, demonstration projects, wind/diesel deployment strategies and requirements, wind/diesel market development and economics, wind turbine design requirements, and wind/diesel models and analytical tools. Separate abstracts have been prepared for 11 papers from this workshop

  19. Sixth international wind-diesel workshop

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    At a workshop on hybrid wind/diesel power generation systems, papers were presented on international research programs, demonstration projects, wind/diesel deployment strategies and requirements, wind/diesel market development and economics, wind turbine design requirements, and wind/diesel models and analytical tools. Separate abstracts have been prepared for 11 papers from this workshop.

  20. Technology Cooperation Agreement Pilot Project: Development-Friendly Greenhouse Gas Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.

    1998-10-30

    This paper provides an overview of TCAPP, including the methodology, the results to date, and proposed future activities. It includes a detailed description of the technology cooperation frameworks completed by each country, the process that produced them and the plans for how TCAPP will help to implement the directions articulated by the country teams. The US Government initiated the Technology Cooperation Agreement Pilot Project (TCAPP) in August 1997 in recognition of the need to establish a mechanism for implementing Article 4.5 of the Framework Convention on Climate Change. ''The developed country partners shall take all practicable steps to promote, facilitate and finance, as appropriate, the transfer of, or access to, environmentally sound technologies and know-how to other Parties, particularly developing country Parties, to enable them to implement the provisions of the Convention.'' TCAPP builds support for implementing clean energy technologies by facilitating collaboration among the participating countries, the US and other OECD countries, international donors, and the private sector. The governments of Brazil, China, Kazakhstan, Mexico and the Philippines are currently participating and helping to shape this initiative. International donors and the private sector have also been actively engaged in the design and implementation of this pilot program.

  1. The Value of Wind Technology Innovation: Implications for the U.S. Power System, Wind Industry, Electricity Consumers, and Environment

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu T [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lantz, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mowers, Matthew [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wiser, Ryan [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-21

    Improvements to wind technologies have, in part, led to substantial deployment of U.S. wind power in recent years. The degree to which technology innovation will continue is highly uncertain adding to uncertainties in future wind deployment. We apply electric sector modeling to estimate the potential wind deployment opportunities across a range of technology advancement projections. The suite of projections considered span a wide range of possible cost and technology innovation trajectories, including those from a recent expert elicitation of wind energy experts, a projection based on the broader literature, and one reflecting estimates based on a U.S. DOE research initiative. In addition, we explore how these deployment pathways may impact the electricity system, electricity consumers, the environment, and the wind-related workforce. Overall, our analysis finds that wind technology innovation can have consequential implications for future wind power development throughout the United States, impact the broader electricity system, lower electric system and consumer costs, provide potential environmental benefits, and grow the U.S. wind workforce.

  2. InfraSound from wind turbines : observations from Castle River wind farm. Volume 1

    International Nuclear Information System (INIS)

    Edworthy, J.; Hepburn, H.

    2005-01-01

    Although infrasound has been discussed as a concern by groups opposed to wind farm facilities, there is very little information available about infrasound and wind turbines. This paper presented details of a project conducted by VisionQuest, the largest wind power producer in Canada. Three sensor types were used: precision sound analyzer, seismic geophones, and calibrated microphones to take measurements in low, medium and high winds. The project also measured infrasound when the wind farm was not operating. Acquisition geometry was presented, as well as details of apparent attenuations of wind noise. It was noted that high wind noise was a dominant factor and that there was little difference when the wind farm was not operational. It was suggested that turbines have no impact with high wind, since wind noise is not attenuated with distance. It was noted that increased geophone amplitudes indicate high wind coupled motion which is attenuated when the turbines are on. Results indicate that all frequencies showed attenuation with distance. Evidence showed that low frequency sound pressure levels were often lower when the turbines were switched on. Where turbines contributed to sound pressure levels, the magnitude of the contribution was below levels of concern to human health. Ambient sound pressure levels were much higher than contributions from wind turbines. It was concluded that wind itself generates infrasound. Wind turbines generate low levels of infrasound, detectable very close to facilities at low to medium wind speeds. Wind turbines may reduce ambient infrasound levels at high wind speeds by converting the energy from the wind into electricity. refs., tabs., figs

  3. Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP). Supplementary task programme

    International Nuclear Information System (INIS)

    1992-06-01

    In the course of Phase II of the Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP), it was found that a number of topical aspects required more detail investigations, specific tests etc. than could be cared for within Phase II, under the constraint of available time and funds. Consequently, supplementary tasks have been defined and contracted. This report is the Final Report on the results achieved during the performance of these tasks. The tasks cover a wide field for example LH 2 Airbus studies some can be associated with more than one aspect. The table following hereunder may give an overview over the tasks covered. For all 23 papers a separate subject analysis has been carried out. (orig.)

  4. Conference on 'How to finance wind energy?'

    International Nuclear Information System (INIS)

    Metzler, Vincent; Weiler, Sibylle; Mous, Dirk; Hodges, Charlie; Talagrand, Romain; Soerensen, Hans Chr.; Feddersen, Hans; Dosdall, Bjoern; Jourdain, Pierre; Duval, Jocelyn

    2010-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on wind energy financing. In the framework of this French-German exchange of experience, more than 150 participants exchanged views on the existing financing solutions for wind energy projects in France, Germany, UK and Denmark. This document brings together the available presentations (slides) made during this event: 1 - How to go on with wind energy projects financing? What evolution of the senior wind energy debt? (Vincent Metzler); 2 - Financing of wind energy projects - Legal aspects (Sibylle Weiler); 3 - Current and future trends in offshore wind financing in Germany (Dirk Mous); 4 - Financing offshore wind: a UK perspective (Charlie Hodges); 5 - Financing the UK Offshore Wind Sector - Transverse analysis of French and European Offshore Wind energy financing (Romain Talagrand); 6 - Cooperative ownership of Danish Wind Turbines (Hans Chr. Soerensen); 7 - Development and financing of a citizen's wind farm - Buergerwindpark (Hans Feddersen); 8 - Citizens' wind farms in Germany - as seen by a project developer (Bjoern Dosdall); 9 - Wind turbines in Vilaine region - A cooperative and pedagogical wind farm: a unique experience in France (Pierre Jourdain); 10 - Status of French participative models (Jocelyn Duval)

  5. Effectiveness of Changing Wind Turbine Cut-in Speed to Reduce Bat Fatalities at Wind Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Huso, Manuela M. P. [Oregon State Univ., Corvallis, OR (United States); Hayes, John P. [Univ. of Florida, Gainesville, FL (United States)

    2009-04-01

    This report details an experiment on the effectiveness of changing wind turbine cut-in speed on reducing bat fatality from wind turbines at the Casselman Wind Project in Somerset County, Pennsylvania.

  6. Joint Applications Pilot of the National Climate Predictions and Projections Platform and the North Central Climate Science Center: Delivering climate projections on regional scales to support adaptation planning

    Science.gov (United States)

    Ray, A. J.; Ojima, D. S.; Morisette, J. T.

    2012-12-01

    The DOI North Central Climate Science Center (NC CSC) and the NOAA/NCAR National Climate Predictions and Projections (NCPP) Platform and have initiated a joint pilot study to collaboratively explore the "best available climate information" to support key land management questions and how to provide this information. NCPP's mission is to support state of the art approaches to develop and deliver comprehensive regional climate information and facilitate its use in decision making and adaptation planning. This presentation will describe the evolving joint pilot as a tangible, real-world demonstration of linkages between climate science, ecosystem science and resource management. Our joint pilot is developing a deliberate, ongoing interaction to prototype how NCPP will work with CSCs to develop and deliver needed climate information products, including translational information to support climate data understanding and use. This pilot also will build capacity in the North Central CSC by working with NCPP to use climate information used as input to ecological modeling. We will discuss lessons to date on developing and delivering needed climate information products based on this strategic partnership. Four projects have been funded to collaborate to incorporate climate information as part of an ecological modeling project, which in turn will address key DOI stakeholder priorities in the region: Riparian Corridors: Projecting climate change effects on cottonwood and willow seed dispersal phenology, flood timing, and seedling recruitment in western riparian forests. Sage Grouse & Habitats: Integrating climate and biological data into land management decision models to assess species and habitat vulnerability Grasslands & Forests: Projecting future effects of land management, natural disturbance, and CO2 on woody encroachment in the Northern Great Plains The value of climate information: Supporting management decisions in the Plains and Prairie Potholes LCC. NCCSC's role in

  7. The Great Plains Wind Power Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, John [Texas Tech Univ., Lubbock, TX (United States)

    2014-01-30

    This multi-year, multi-faceted project was focused on the continued development of a nationally-recognized facility for the testing, characterization, and improvement of grid-connected wind turbines, integrated wind-water desalination systems, and related educational and outreach topics. The project involved numerous faculty and graduate students from various engineering departments, as well as others from the departments of Geosciences (in particular the Atmospheric Science Group) and Economics. It was organized through the National Wind Institute (NWI), which serves as an intellectual hub for interdisciplinary and transdisciplinary research, commercialization and education related to wind science, wind energy, wind engineering and wind hazard mitigation at Texas Tech University (TTU). Largely executed by an academic based team, the project resulted in approximately 38 peer-reviewed publications, 99 conference presentations, the development/expansion of several experimental facilities, and two provisional patents.

  8. Community-Based Vocational Rehabilitation (CBVR) for People with Disabilities: Experiences from a Pilot Project in Nigeria

    Science.gov (United States)

    Alade, Eunice B.

    2004-01-01

    This article discusses the community-based vocational rehabilitation (CBVR) of persons with disabilities. In 1991, a pilot project was instituted by the International Labour Organisation and the United Nations Development Programme in conjunction with Oyo State Government in Nigeria. The aim was to facilitate the reintegration of persons with…

  9. Human Development across the Lifespan. A Pilot Intergenerational Project in Three Pennsylvania School Districts. Final Evaluation.

    Science.gov (United States)

    Ward, Christopher R.; Balavage, Valerie

    An evaluation determined the impact on participants of pilot intergenerational programs in the Central Greene, Quaker Valley, and Titusville school districts in western Pennsylvania. It examined how participation in project activities changed students' attitudes about older adults and aging. A four-part questionnaire consisted of the following:…

  10. Progress in wind tunnel experimental techniques for wind turbine?

    Institute of Scientific and Technical Information of China (English)

    Jingping XIAO; Li CHEN; Qiang WANG; Qiao WANG

    2016-01-01

    Based on the unsteady aerodynamics experiment (UAE) phase VI and the model experiment in controlled conditions (MEXICO) projects and the related research carried out in China Aerodynamic Research and Development Center (CARDC), the recent progress in the wind tunnel experimental techniques for the wind turbine is sum-marized. Measurement techniques commonly used for di?erent types of wind tunnel ex-periments for wind turbine are reviewed. Important research achievements are discussed, such as the wind tunnel disturbance, the equivalence of the airfoil in?ow condition, the three-dimensional (3D) e?ect, the dynamic in?ow in?uence, the ?ow ?eld structure, and the vortex induction. The corresponding research at CARDC and some ideas on the large wind turbine are also introduced.

  11. Base line studies North Sea wind farms

    NARCIS (Netherlands)

    Krijgsveld, K.L.; Lieshout, S.M.J.; Schekkerman, H.; Lensink, Rick; Poot, M.J.M.; Dirksen, S.

    2003-01-01

    The Dutch government has granted ‘Noordzeewind’ (Nuon Renewable Energy Projects and Shell Wind Energy) the possibility to build a wind farm consisting of 36 wind turbines off the coast of the Netherlands, near Egmond. This project serves to evaluate the economical, technical, ecological and social

  12. Applying value sensitive design (VSD) to wind turbines and wind parks: an exploration.

    Science.gov (United States)

    Oosterlaken, Ilse

    2015-04-01

    Community acceptance still remains a challenge for wind energy projects. The most popular explanation for local opposition, the Not in My Backyard effect, has received fierce criticism in the past decade. Critics argue that opposition is not merely a matter of selfishness or ignorance, but that moral, ecological and aesthetic values play an important role. In order to better take such values into account, a more bottom-up, participatory decision process is usually proposed. Research on this topic focusses on either stakeholder motivations/attitudes, or their behavior during project implementation. This paper proposes a third research focus, namely the 'objects' which elicit certain behavioral responses and attitudes-the wind turbine and parks. More concretely, this paper explores Value Sensitive Design (VSD) as way to arrive at wind turbines and parks that better embed or reflect key values. After a critical discussion of the notion of acceptance versus acceptability and support, the paper discusses existing literature on ecology and aesthetics in relation to wind turbine/park design, which could serve as 'building blocks' of a more integral VSD approach of the topic. It also discusses the challenge of demarcating wind park projects as VSD projects. A further challenge is that VSD has been applied mainly at the level of technical artifacts, whereas wind parks can best be conceptualized as socio-technical system. This new application would therefore expand the current practice of VSD, and may as a consequence also lead to interesting new insights for the VSD community. The paper concludes that such an outcome-oriented approach of wind turbines and park is worth exploring further, as a supplement to rather than a replacement of the process-oriented approach that is promoted by the current literature on community acceptance of wind parks.

  13. Wind Development on Tribal Lands

    Energy Technology Data Exchange (ETDEWEB)

    Ken Haukaas; Dale Osborn; Belvin Pete

    2008-01-18

    Background: The Rosebud Sioux Tribe (RST) is located in south central South Dakota near the Nebraska border. The nearest community of size is Valentine, Nebraska. The RST is a recipient of several Department of Energy grants, written by Distributed Generation Systems, Inc. (Disgen), for the purposes of assessing the feasibility of its wind resource and subsequently to fund the development of the project. Disgen, as the contracting entity to the RST for this project, has completed all the pre-construction activities, with the exception of the power purchase agreement and interconnection agreement, to commence financing and construction of the project. The focus of this financing is to maximize the economic benefits to the RST while achieving commercially reasonable rates of return and fees for the other parties involved. Each of the development activities required and its status is discussed below. Land Resource: The Owl Feather War Bonnet 30 MW Wind Project is located on RST Tribal Trust Land of approximately 680 acres adjacent to the community of St. Francis, South Dakota. The RST Tribal Council has voted on several occasions for the development of this land for wind energy purposes, as has the District of St. Francis. Actual footprint of wind farm will be approx. 50 acres. Wind Resource Assessment: The wind data has been collected from the site since May 1, 2001 and continues to be collected and analyzed. The latest projections indicate a net capacity factor of 42% at a hub height of 80 meters. The data has been collected utilizing an NRG 9300 Data logger System with instrumentation installed at 30, 40 and 65 meters on an existing KINI radio tower. The long-term annual average wind speed at 65-meters above ground level is 18.2 mph (8.1 mps) and 18.7 mph (8.4 mps) at 80-meters agl. The wind resource is excellent and supports project financing.

  14. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  15. Wind resource assessment and wind energy system cost analysis: Fort Huachuca, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, T.L. [Tim Olsen Consulting, Denver, CO (United States); McKenna, E. [National Renewable Energy Lab., Golden, CO (United States)

    1997-12-01

    The objective of this joint DOE and National Renewable Energy Laboratory (NREL) Strategic Environmental Research and Development Program (SERDP) project is to determine whether wind turbines can reduce costs by providing power to US military facilities in high wind areas. In support of this objective, one year of data on the wind resources at several Fort Huachuca sites was collected. The wind resource data were analyzed and used as input to an economic study for a wind energy installation at Fort Huachuca. The results of this wind energy feasibility study are presented in the report.

  16. WEP. A wind energy planning system

    International Nuclear Information System (INIS)

    Larsen, H.V.

    1991-11-01

    The report describes the Wind Energy Planning system (WEP). It is intended as a decision support system to be used in the economic evaluation of wind energy projects. Such projects could be minor projects with only a single wind turbine or large wind farm projects consisting of several wind turbine plants. In the WEP system, a wind turbine is described by data on initial investment, possible later reinvestments, O and M costs, expected yearly production, life time, and capacity factor. The raising of loans are modelled, too. Depending on which output report is created, the value of the wind generated electricity is calculated in two different ways: either the electricity is assumed to be sold at a price (time series) given by the user, or the alternative conventional power production is modelled by its specific investment, O and M costs, life time, effectivity, fuel mix, and time series for fuel prices. Using these data, capacity credit and saved fuel and O and M costs are calculated. Due to the flexible data structure of the model, the user can easily create a scenario that models a large scale introduction of wind power. In such a scenario the gradual build up through several years of the wind power capacity can be modelled. The report describes in detail the menu structure, the input facilities, the output reports, and the organization of data. Also included is an example with full input documentation and output reports. (au)

  17. Sequential projection pursuit for optimised vibration-based damage detection in an experimental wind turbine blade

    Science.gov (United States)

    Hoell, Simon; Omenzetter, Piotr

    2018-02-01

    To advance the concept of smart structures in large systems, such as wind turbines (WTs), it is desirable to be able to detect structural damage early while using minimal instrumentation. Data-driven vibration-based damage detection methods can be competitive in that respect because global vibrational responses encompass the entire structure. Multivariate damage sensitive features (DSFs) extracted from acceleration responses enable to detect changes in a structure via statistical methods. However, even though such DSFs contain information about the structural state, they may not be optimised for the damage detection task. This paper addresses the shortcoming by exploring a DSF projection technique specialised for statistical structural damage detection. High dimensional initial DSFs are projected onto a low-dimensional space for improved damage detection performance and simultaneous computational burden reduction. The technique is based on sequential projection pursuit where the projection vectors are optimised one by one using an advanced evolutionary strategy. The approach is applied to laboratory experiments with a small-scale WT blade under wind-like excitations. Autocorrelation function coefficients calculated from acceleration signals are employed as DSFs. The optimal numbers of projection vectors are identified with the help of a fast forward selection procedure. To benchmark the proposed method, selections of original DSFs as well as principal component analysis scores from these features are additionally investigated. The optimised DSFs are tested for damage detection on previously unseen data from the healthy state and a wide range of damage scenarios. It is demonstrated that using selected subsets of the initial and transformed DSFs improves damage detectability compared to the full set of features. Furthermore, superior results can be achieved by projecting autocorrelation coefficients onto just a single optimised projection vector.

  18. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  19. 2015 Wind Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoen, Ben [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rand, Joe [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Porter, Kevin [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-08-01

    This annual report--now in its tenth year--provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation trends and then covers an array of industry and technology trends. The report also discusses project performance, wind turbine prices, project costs, operations and maintenance expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments, expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments.

  20. Comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    Science.gov (United States)

    List of comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).