WorldWideScience

Sample records for wildlife mitigation plan

  1. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  2. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  3. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  4. Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Creveling, Jennifer

    1986-08-01

    The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

  5. Wildlife mitigation program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  6. Wildlife mitigation program final environmental impact statement

    International Nuclear Information System (INIS)

    1997-03-01

    BPA is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and improvement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative, i.e., not to establish program-wide standards. Five standardizing (action) alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  7. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  8. Wildlife Mitigation Program. Record of Decision

    International Nuclear Information System (INIS)

    1997-06-01

    Bonneville Power Administration (BPA) has decided to adopt a set of Descriptions (goals, strategies, and procedural requirements) that apply to future BPA-funded wildlife mitigation projects. Various. sources-including Indian tribes, state agencies, property owners, private conservation groups, or other Federal agencies-propose wildlife mitigation projects to the Northwest Power Planning Council (Council) for BPA funding. Following independent scientific and public reviews, Council then selects projects to recommend for BPA funding. BPA adopts this set of prescriptions to standardize the planning and implementation of individual wildlife mitigation projects. This decision is based on consideration of potential environmental impacts evaluated in BPA's Wildlife Mitigation Program Final Environmental Impact Statement (DOE/EIS-0246) published March, 20, 1997, and filed with the Environmental Protection Agency (EPA) the week of March 24, 1997 (EPA Notice of Availability Published April 4, 1997, 62 FR 65, 16154). BPA will distribute this Record of Decision to all known interested and affected persons, groups, tribes, and agencies

  9. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  10. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  11. Albeni Falls wildlife mitigation project: annual report of mitigation activities

    International Nuclear Information System (INIS)

    Terra-Burns, Mary

    2002-01-01

    The Albeni Falls Interagency Work Group was actively engaged in implementing wildlife mitigation activities in 2001. The Work Group met quarterly to discuss management and budget issues affecting the Albeni Falls Wildlife Mitigation Program. Work Group members protected 851 acres of wetland habitat in 2001. Wildlife habitat protected to date for the Albeni Falls project is approximately 5,248.31 acres (∼4,037.48 Habitat Units). Approximately 14% of the total wildlife habitat lost has been mitigated. Administrative activities increased as funding was more evenly distributed among Work Group members and protection opportunities became more time consuming. In 2001, Work Group members focused on development and implementation of the monitoring and evaluation program as well as completion of site-specific management plans. With the implementation of the monitoring and evaluation program, and as management plans are reviewed and executed, on the ground management activities are expected to increase in 2002

  12. Participatory planning of interventions to mitigate human-wildlife conflicts.

    Science.gov (United States)

    Treves, Adrian; Wallace, R B; White, S

    2009-12-01

    Conservation of wildlife is especially challenging when the targeted species damage crops or livestock, attack humans, or take fish or game. Affected communities may retaliate and destroy wildlife or their habitats. We summarize recommendations from the literature for 13 distinct types of interventions to mitigate these human-wildlife conflicts. We classified eight types as direct (reducing the severity or frequency of encounters with wildlife) and five as indirect (raising human tolerance for encounters with wildlife) interventions. We analyzed general cause-and-effect relationships underlying human-wildlife conflicts to clarify the focal point of intervention for each type. To organize the recommendations on interventions we used three standard criteria for feasibility: cost-effective design, wildlife specificity and selectivity, and sociopolitical acceptability. The literature review and the feasibility criteria were integrated as decision support tools in three multistakeholder workshops. The workshops validated and refined our criteria and helped the participants select interventions. Our approach to planning interventions is systematic, uses standard criteria, and optimizes the participation of experts, policy makers, and affected communities. We argue that conservation action generally will be more effective if the relative merits of alternative interventions are evaluated in an explicit, systematic, and participatory manner.

  13. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  14. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Terra-Berns, Mary

    2003-01-01

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue to center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.

  15. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  16. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  17. Oregon wildlife planning coordination project: Annual report, October 1, 1998 to September 30, 1999

    International Nuclear Information System (INIS)

    Barnes, S.P.

    1999-01-01

    The intent of the Oregon Wildlife Planning Coordination project is to fund Oregon Department of Fish and Wildlife (ODFW) staff to facilitate wildlife mitigation coordination and planning between Oregon wildlife managers. The primary goal of ODFW wildlife mitigation planning/coordination staff is to foster, facilitate, and manage a statewide cooperative wildlife mitigation planning and implementation effort between the Oregon wildlife managers (the Oregon Wildlife Coalition or OWC) to mitigate for wildlife losses in Oregon caused by the development and operation of the hydropower system

  18. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  19. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  20. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    Energy Technology Data Exchange (ETDEWEB)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  1. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  2. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  3. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  4. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  5. Northeast Oregon Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1996-08-01

    Development of the hydropower system in the Columbia River Basin has had far-reaching effects on many species of wildlife. The Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the Federal portion of this system, as allocated to the purpose of power production. BPA needs to mitigate for loss of wildlife habitat in the Snake River Subbasin

  6. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  7. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Soults, Scott [Kootenai Tribe of Idaho

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  8. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  9. Rainwater Wildlife Area Management Plan : Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    2002-02-01

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

  10. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  11. Blue Creek Winter Range: Wildlife Mitigation Project

    International Nuclear Information System (INIS)

    1994-01-01

    This preliminary Environmental Assessment examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities are analyzed: Habitat protection; Habitat enhancement; Operation and maintenance; and Monitoring and evaluation. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  12. Rainwater Wildlife Area Habitat Evaluation Procedures Report; A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2004-01-01

    vegetation species, allowance of normative processes such as fire occurrence, and facilitating development of natural stable stream channels and associated floodplains. Implementation of habitat enhancement and restoration activities could generate an additional 1,850 habitat units in 10 years. Baseline and estimated future habitat units total 7,035.3 for the Rainwater Wildlife Area. Habitat protection, enhancement and restoration will require long-term commitments from managers to increase probabilities of success and meet the goals and objectives of the Northwest Power Planning Council's Fish and Wildlife Mitigation Program.

  13. Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

    2009-01-01

    The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

  14. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  15. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  16. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  17. Northwest Montana Wildlife Mitigation Habitat Protection : Advance Design : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn A.

    1993-02-01

    This report summarizes the habitat protection process developed to mitigate for certain wildlife and wildlife habitat losses due to construction of Hungry Horse and Libby dams in northwestern Montana.

  18. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  19. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  20. Cautious but Committed: Moving Toward Adaptive Planning and Operation Strategies for Renewable Energy's Wildlife Implications

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned—creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  1. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  2. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    International Nuclear Information System (INIS)

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapra americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures

  3. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  4. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  5. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  6. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  7. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  8. Conceptual Model for Mitigating Human - Wildlife Conflict based on System Thinking

    Science.gov (United States)

    Patana, Pindi; Mawengkang, Herman; Silvi Lydia, Maya

    2018-01-01

    In conservation process it is unavoidably that conflict incidents may occur among the people and wild-life in the surrounding of the conservation area. Mitigating conflict between wildlife and people is considered a top conservation priority, particularly in landscapes where high densities of people and wildlife co-occur. This conflict is also happened in Leuser conservation area located in the border of North Sumatra and Aceh province, Indonesia. Easing the conflict problem is very difficult. This paper proposes a conceptual model based on system thinking to explore factors that may have great influence on the conflict and to figure out mitigating the conflict. We show how this conceptual framework can be utilized to analyze the conflict occur and further how it could used to develop a multi- criteria decision model.

  9. Oldman River Dam wildlife habitat mitigation program, Pincher Creek, Alberta: Final report. Summary of the implementation phase, 1987--1993

    International Nuclear Information System (INIS)

    1998-01-01

    This article summarizes the 1987--1993 implementation phase of the Oldman River Dam Wildlife Habitat Mitigation Program, intended to offset the negative impact of dam construction and operation on plant and animal species. Projects carried out during the program included creation of wetlands, tree and shrub planting, installation of snow and wildlife fences, and installation of replacement nesting sites for birds. Summaries are provided of the process that led to the final program design, the projects undertaken to complete the program, the design strategies, and the proposed habitat mitigation projects. Also included are an inventory of completed projects, an evaluation of the program's success in meeting its objectives and of the mitigation techniques used in the program, and a recommended strategy for future management of the program. Appendices include habitat suitability index models, summaries of related reports, vegetation maps, and a grazing management plan

  10. L-Reactor Habitat Mitigation Study

    International Nuclear Information System (INIS)

    1988-02-01

    The L-Reactor Fish and Wildlife Resource Mitigation Study was conducted to quantify the effects on habitat of the L-Reactor restart and to identify the appropriate mitigation for these impacts. The completed project evaluated in this study includes construction of a 1000 acre reactor cooling reservoir formed by damming Steel Creek. Habitat impacts identified include a loss of approximately 3,700 average annual habitat units. This report presents a mitigation plan, Plan A, to offset these habitat losses. Plan A will offset losses for all species studied, except whitetailed deer. The South Carolina Wildlife and Marine Resources Department strongly recommends creation of a game management area to provide realistic mitigation for loss of deer habitats. 10 refs., 5 figs., 3 tabs

  11. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlife species incurring positive impacts attributable to the project were identified.

  12. Ottawa National Wildlife Refuge : Wildlife Inventory Plan

    Data.gov (United States)

    Department of the Interior — This Wildlife Inventory Plan for Ottawa NWR describes the inventory program’s relation to Refuge objectives and outlines the program’s policies and administration....

  13. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cousins, Katherine [Idaho Department of Fsh and Game

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  14. Libby/Hungry Horse Dams Wildlife Mitigation Habitat Protection : Interim Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1991-04-01

    The Columbia River Basin Fish and Wildlife Program identified mitigation goals for Hungry Horse and Libby dams (1987). Specific programs goals included: (1) protect and/or enhance 4565 acres of wetland habitat in the Flathead Valley; (2) protect 2462 acres of prairie habitat within the vicinity of the Tobacco Plains Columbian sharp-tailed grouse; (3) protect 8590 acres riparian habitat in northwest Montana for grizzly and black bears; and (4) protect 11,500 acres of terrestrial furbearer habitat through cooperative agreements with state and federal agencies and private landowners. The purpose of this project is to continue to develop and obtain information necessary to evaluate and implement specific wildlife habitat protection actions in northwestern Montana. This report summarizes project work completed between May 1, 1990, and December 31, 1990. There were three primary project objectives during this time: obtain specific information necessary to develop the mitigation program for Columbian sharp-tailed grouse; continue efforts necessary to develop, refine, and coordinate the mitigation programs for waterfowl/wetlands and grizzly/black bears; determine the opportunity and appropriate strategies for protecting terrestrial furbearer habitat by lease or management agreements on state, federal and private lands. 19 refs., 1 tab.

  15. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  16. Burlington Bottoms wildlife mitigation site : five-year habitat management plan, 2001-2005

    International Nuclear Information System (INIS)

    Beilke, Susan G.

    2001-01-01

    Historically the lower Columbia and Willamette River Basins were ecologically rich in both the habitat types and the species diversity they supported. This was due in part to the pattern of floods and periodic inundation of bottomlands that occurred, which was an important factor in creating and maintaining a complex system of wetland, meadow, and riparian habitats. This landscape has been greatly altered in the past 150 years, primarily due to human development and agricultural activities including cattle grazing, logging and the building of hydroelectric facilities for hydropower, navigation, flood control and irrigation in the Columbia and Willamette River Basins. The Burlington Bottoms (BB) wetlands contains some of the last remaining bottomlands in the area, supporting a diverse array of native plant and wildlife species. Located approximately twelve miles northwest of Portland and situated between the Tualatin Mountains to the west and Multnomah Channel and Sauvie Island to the east, the current habitats are remnant of what was once common throughout the region. In order to preserve and enhance this important site, a five-year habitat management plan has been written that proposes a set of actions that will carry out the goals and objectives developed for the site, which includes protecting, maintaining and enhancing wildlife habitat for perpetuity

  17. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    International Nuclear Information System (INIS)

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) of riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period

  18. Libby/Hungry Horse Dams Wildlife Mitigation : Montana Wildlife Habitat Protection : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1992-12-01

    The purpose of this project was to develop and obtain information necessary to evaluate and undertake specific wildlife habitat protection/enhancement actions in northwest Montana as outlined in the Columbia River Basin Fish and Wildlife Program. Three waterfowl projects were evaluated between September 1989 and June 1990. Weaver's Slough project involved the proposed acquisition of 200 acres of irrigated farmland and a donated conservation easement on an additional 213 acres. The proposal included enhancement of the agricultural lands by conversion to upland nesting cover. This project was rated the lowest priority based on limited potential for enhancement and no further action was pursued. The Crow Creek Ranch project involved the proposed acquisition of approximately 1830 acres of grazing and dryland farming lands. The intent would be to restore drained potholes and provide adjacent upland nesting cover to increase waterfowl production. This project received the highest rating based on the immediate threat of subdivision, the opportunity to restore degraded wetlands, and the overall benefits to numerous species besides waterfowl. Ducks Unlimited was not able to participate as a cooperator on this project due to the jurisdiction concerns between State and tribal ownership. The USFWS ultimately acquired 1,550 acres of this proposed project. No mitigation funds were used. The Ashley Creek project involved acquisition of 870 acres adjacent to the Smith Lake Waterfowl Production Area. The primary goal was to create approximately 470 acres of wetland habitat with dikes and subimpoundments. This project was rated second in priority due to the lesser threat of loss. A feasibility analysis was completed by Ducks Unlimited based on a concept design. Although adequate water was available for the project, soil testing indicated that the organic soils adjacent to the creek would not support the necessary dikes. The project was determined not feasible for mitigation

  19. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  20. South Fork Snake River/Palisades Wildlife Mitigation Project: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. The Idaho Department of Fish and Game drafted the plan, which was completed in May 1993. This plan recommends land and conservation easement acquisition and wildlife habitat enhancement measures. These measures would be implemented on selected lands along the South Fork of the Snake River between Palisades Dam and the confluence with the Henry`s Fork, and on portions of the Henry`s Fork located in Bonneville, Madison, and Jefferson Counties, Idaho. BPA has prepared an Environmental Assessment evaluating the proposed project. The EA also incorporates by reference the analyses in the South Fork Snake River Activity/Operations Plan and EA prepared jointly in 1991 by the Bureau of Land Management and the Forest Service. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  1. 44 CFR 78.5 - Flood Mitigation Plan development.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  2. Coeur d'Alene Tribe Fish, Water and Wildlife Program : Coeur d'Alene Tribe Trout Production Facility Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Peters, Ronald L.; Woodward-Lilengreen, Kelly L.; Vitale, Angelo J.

    1999-09-01

    The Northwest Power Planning Council (Council) receives and reviews proposals to mitigate for fish and wildlife losses and refers approved measures to Bonneville Power Administration (BPA) for funding. The Northwest Power Act (Act) calls on the Council to include measures in its Columbia River Basin Fish and Wildlife Program (Program) to address system-wide fish and wildlife losses. The Act further states that the Council may include in its Program measures that provide off-site mitigation--mitigation physically removed from the hydro project(s) that caused the need to mitigate. The Program includes a goal ''to recover and preserve the health of native resident fish injured by the hydropower system, where feasible, and, where appropriate, to use resident fish to mitigate for anadromous fish losses in the system.'' Among those recommended measures are off-site mitigation for losses of anadromous fisheries including the measure under analysis in this Coeur d'Alene Tribe Trout Production Facility Master Plan, proposed by the Coeur d'Alene Tribe. To meet the need for off-site mitigation for anadromous fish losses in the Columbia River Basin in a manner consistent with the objectives of the Council's Fish and Wildlife Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operations and maintenance of a trout production facility on the Coeur d'Alene Indian Reservation. Measures for establishing a Coeur d'Alene fish production facility have been a part of the Council's Program since 1987. The Coeur d'Alene Tribe Trout Production Facility is intended to rear and release westslope cutthroat trout into rivers and streams with the express purpose of increasing the numbers of fish spawning, incubating and rearing in the natural environment. It will use the modern technology that hatcheries offer to overcome the mortality resulting from habitat degradation in lakes, rivers, and

  3. Forest inventory, Peter T. Johnson Wildlife Mitigation Unit, Craig Mountain, Idaho. Final report

    International Nuclear Information System (INIS)

    Narolski, S.W.

    1996-12-01

    The primary objective of this report is to determine the quantity and quality of existing forest habitat types on the 59,991-acre Peter T. Johnson Wildlife Mitigation Unit (WMU). Products from this effort include a description of the ecological condition, a map of habitat types, and an inventory of forest resources on the WMU lands. The purpose of this and other resource inventories (plant and wildlife) is to assess the current resources condition of the WMU and to provide necessary information to generate a long-term management for this area

  4. Forest inventory: Peter T. Johnson Wildlife Mitigation Unit, Craig Mountain, Idaho. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Narolski, Steven W.

    1996-12-01

    The primary objective of this report is to determine the quantity and quality of existing forest habitat types on the 59,991-acre Peter T. Johnson Wildlife Mitigation Unit (WMU). Products from this effort include a description of the ecological condition, a map of habitat types, and an inventory of forest resources on the WMU lands. The purpose of this and other resource inventories (plant and wildlife) is to assess the current resources condition of the WMU and to provide necessary information to generate a long-term management for this area.

  5. Mitigation Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The Final Supplemental Environmental Impact Report (SEIR) (September 1992) for the Proposed Renewal of the Contract between the United States Department of Energy and The Regents of the University of California for the Operation and Management of the Lawrence Berkeley Laboratory identifies the environmental impacts associated with renewing the contract and specifies a series of measures designed to mitigate adverse impacts to the environment. This Mitigation Monitoring Plan describes the procedures the University will use to implement the mitigation measures adopted in connection with the approval of the Contract.

  6. Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Giffen, Neil R [ORNL

    2007-05-01

    This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.

  7. 44 CFR 201.6 - Local Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ..., require a local mitigation plan for the Repetitive Flood Claims Program. A local government must have a... eligible for FMA project grants. However, these plans must be clearly identified as being flood mitigation... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Local Mitigation Plans. 201.6...

  8. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Shoreline erosion/mitigation planning... erosion/mitigation planning. (a) The management program must include a planning process for assessing the... planning process may be within the broader context of coastal hazard mitigation planning. (b) The basic...

  9. Mitigation Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  10. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  11. Using scenario planning to evaluate the impacts of climate change on wildlife populations and communities in the Florida Everglades

    Science.gov (United States)

    Catano, Christopher P.; Romañach, Stephanie S.; Beerens, James M.; Pearlstine, Leonard G.; Brandt, Laura A.; Hart, Kristen M.; Mazzotti, Frank J.; Trexler, Joel C.

    2015-01-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  12. Using Scenario Planning to Evaluate the Impacts of Climate Change on Wildlife Populations and Communities in the Florida Everglades

    Science.gov (United States)

    Catano, Christopher P.; Romañach, Stephanie S.; Beerens, James M.; Pearlstine, Leonard G.; Brandt, Laura A.; Hart, Kristen M.; Mazzotti, Frank J.; Trexler, Joel C.

    2015-04-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  13. Wildlife Management Plan for the Oak Ridge Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Giffen, Neil R [ORNL; Evans, James W. [TWRA; Parr, Patricia Dreyer [ORNL

    2007-10-01

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  14. Columbia River wildlife mitigation habitat evaluation procedures report: Scotch Creek Wildlife Area, Berg Brothers, and Douglas County pygmy rabbit projects

    International Nuclear Information System (INIS)

    Ashley, P.R.; Ratassepp, J.; Berger, M.; Judd, S.L.

    1997-01-01

    This Habitat Evaluation Procedure study was conducted to determine baseline habitat units (HUs) on the Scotch Creek, Mineral Hill, Pogue Mountain, Chesaw and Tunk Valley Habitat Areas (collectively known as the Scotch Creek Wildlife Area) in Okanogan County, Sagebrush Flat and the Dormaler property in Douglas County, and the Berg Brothers ranch located in Okanogan County within the Colville Reservation. A HEP team comprised of individuals from the Washington Department of Fish and Wildlife, the Confederated Tribes of the Colville Reservation, and the Natural Resources Conservation Service (Appendix A) conducted baseline habitat surveys using the following HEP evaluation species: mule deer (Odocoileus hemionus), sharp-tailed grouse (Tympanuchus phasianellus), pygmy rabbit (Brachylagus idahoensis), white-tailed deer (Odocoileus virginiana), mink (Mustela vison), Canada goose (Branta canadensis), downy woodpecker (Picoides pubescens), Lewis woodpecker (Melanerpes lewis), and Yellow warbler (Dendroica petechia). Results of the HEP analysis are listed below. General ratings (poor, marginal, fair, etc.,) are described in Appendix B. Mule deer habitat was marginal lacking diversity and quantify of suitable browse species. Sharp-tailed grouse habitat was marginal lacking residual nesting cover and suitable winter habitat Pygmy rabbit habitat was in fair condition except for the Dormaier property which was rated marginal due to excessive shrub canopy closure at some sites. This report is an analysis of baseline habitat conditions on mitigation project lands and provides estimated habitat units for mitigation crediting purposes. In addition, information from this document could be used by wildlife habitat managers to develop management strategies for specific project sites

  15. Columbia River Wildlife Mitigation Habitat Evaluation Procedures Report / Scotch Creek Wildlife Area, Berg Brothers, and Douglas County Pygmy Rabbit Projects.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    1997-01-01

    This Habitat Evaluation Procedure study was conducted to determine baseline habitat units (HUs) on the Scotch Creek, Mineral Hill, Pogue Mountain, Chesaw and Tunk Valley Habitat Areas (collectively known as the Scotch Creek Wildlife Area) in Okanogan County, Sagebrush Flat and the Dormaler property in Douglas County, and the Berg Brothers ranch located in Okanogan County within the Colville Reservation. A HEP team comprised of individuals from the Washington Department of Fish and Wildlife, the Confederated Tribes of the Colville Reservation, and the Natural Resources Conservation Service (Appendix A) conducted baseline habitat surveys using the following HEP evaluation species: mule deer (Odocoileus hemionus), sharp-tailed grouse (Tympanuchus phasianellus), pygmy rabbit (Brachylagus idahoensis), white-tailed deer (Odocoileus virginiana), mink (Mustela vison), Canada goose (Branta canadensis), downy woodpecker (Picoides pubescens), Lewis woodpecker (Melanerpes lewis), and Yellow warbler (Dendroica petechia). Results of the HEP analysis are listed below. General ratings (poor, marginal, fair, etc.,) are described in Appendix B. Mule deer habitat was marginal lacking diversity and quantify of suitable browse species. Sharp-tailed grouse habitat was marginal lacking residual nesting cover and suitable winter habitat Pygmy rabbit habitat was in fair condition except for the Dormaier property which was rated marginal due to excessive shrub canopy closure at some sites. This report is an analysis of baseline habitat conditions on mitigation project lands and provides estimated habitat units for mitigation crediting purposes. In addition, information from this document could be used by wildlife habitat managers to develop management strategies for specific project sites.

  16. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries

  17. Wildlife Conservation Planning Using Stochastic Optimization and Importance Sampling

    Science.gov (United States)

    Robert G. Haight; Laurel E. Travis

    1997-01-01

    Formulations for determining conservation plans for sensitive wildlife species must account for economic costs of habitat protection and uncertainties about how wildlife populations will respond. This paper describes such a formulation and addresses the computational challenge of solving it. The problem is to determine the cost-efficient level of habitat protection...

  18. Burlington Bottoms Wildlife Mitigation Site : Five-Year Habitat Management Plan, 2001-2005, 2000-2001 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beilke, Susan G.

    2001-09-01

    Historically the lower Columbia and Willamette River Basins were ecologically rich in both the habitat types and the species diversity they supported. This was due in part to the pattern of floods and periodic inundation of bottomlands that occurred, which was an important factor in creating and maintaining a complex system of wetland, meadow, and riparian habitats. This landscape has been greatly altered in the past 150 years, primarily due to human development and agricultural activities including cattle grazing, logging and the building of hydroelectric facilities for hydropower, navigation, flood control and irrigation in the Columbia and Willamette River Basins. The Burlington Bottoms (BB) wetlands contains some of the last remaining bottomlands in the area, supporting a diverse array of native plant and wildlife species. Located approximately twelve miles northwest of Portland and situated between the Tualatin Mountains to the west and Multnomah Channel and Sauvie Island to the east, the current habitats are remnant of what was once common throughout the region. In order to preserve and enhance this important site, a five-year habitat management plan has been written that proposes a set of actions that will carry out the goals and objectives developed for the site, which includes protecting, maintaining and enhancing wildlife habitat for perpetuity.

  19. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  20. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  1. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  2. Structural master plan of flood mitigation measures

    OpenAIRE

    A. Heidari

    2009-01-01

    Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possi...

  3. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  4. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  5. Scaling roads and wildlife: The Cinderella principle

    Science.gov (United States)

    Bissonette, J.A.

    2002-01-01

    It is clear that a reduction in both direct and indirect effects of roads and road networks must be the goal of management agencies. However, increased permeability of roaded landscapes can only be achieved by up-front planning and subsequent mitigative actions. The key is to understand that roads must be made permeable to the movement of animals. More profoundly, ecosystem services, i.e., clean water, clean air, uncontaminated soil, natural landscapes, recreation opportunities, abundant wildlife, and life sustaining ecological processes must not be seriously impacted. In other words, quality of life as measured by ecosystem services should be a major component of the planning process when roads are constructed or improved. Mitigative structures exist to increase permeability of roads. Wildlife overpasses and underpasses, often referred to as ecoducts or green bridges, with associated structures to enable larger animals to exit the road right of way, e.g., earthen escape ramps (BISSONETTE and HAMMER, 2001), various culvert designs for smaller animals including badger pipes and amphibian and reptile tunnels, and fish ladders are but a small sampling of the structures already in place around the world. What is needed is attention to the big picture. Landscapes need to be reconnected and made more permeable. Responsible agencies and organizations need to be aggressive about promoting mitigations and a conservation ethic into road planning. Only with a broad based effort between a concerned public, a database to work from, and a willingness of responsible agencies, will the now very large virtual footprint of roads and road networks be reduced to more closely approximate the physical footprint. By embracing the Cinderella Principle of making the virtual shoe fit more closely the actual physical footprint of roads, we will be able to achieve a closer connection with ecological harmony with its resultant effect of abundant wildlife.

  6. [Wildlife damage mitigation in agricultural crops in a Bolivian montane forest].

    Science.gov (United States)

    Perez, Eddy; Pacheco, Luis F

    2014-12-01

    Wildlife is often blamed for causing damage to human activities, including agricultural practices and the result may be a conflict between human interests and species conservation. A formal assessment of the magnitude of damage is necessary to adequately conduct management practices and an assessment of the efficiency of different management practices is necessary to enable managers to mitigate the conflict with rural people. This study was carried out to evaluate the effectiveness of agricultural management practices and controlled hunting in reducing damage to subsistence annual crops at the Cotapata National Park and Natural Area of Integrated Management. The design included seven fields with modified agricultural practices, four fields subjected to control hunting, and five fields held as controls. We registered cultivar type, density, frequency of visiting species to the field, crops lost to wildlife, species responsible for damage, and crop biomass. Most frequent species in the fields were Dasyprocta punctata and Dasypus novemcinctus. Hunted plots were visited 1.6 times more frequently than agriculturally managed plots. Crop lost to wildlife averaged 7.28% at agriculturally managed plots, 4.59% in plots subjected to hunting, and 27.61% in control plots. Species mainly responsible for damage were Pecari tajacu, D. punctata, and Sapajus apella. We concluded that both management strategies were effective to reduce damage by >50% as compared to unmanaged crop plots.

  7. Landscape ecological planning: Integrating land use and wildlife conservation for biomass crops

    Energy Technology Data Exchange (ETDEWEB)

    Schiller, A.

    1995-12-31

    What do a mussel shoat, a zoo, and a biomass plantation have in common? Each can benefit from ecology-based landscape planning. This paper provides examples of landscape ecological planning from some diverse projects the author has worked on, and discusses how processes employed and lessons learned from these projects are being used to help answer questions about the effects of biomass plantings (hardwood tree crops and native grasses) on wildlife habitat. Biomass environmental research is being designed to assess how plantings of different acreage, composition and landscape context affect wildlife habitat value, and is addressing the cumulative effect on wildlife habitat of establishing multiple biomass plantations across the landscape. Through landscape ecological planning, answers gleaned from research can also help guide biomass planting site selection and harvest strategies to improve habitat for native wildlife species within the context of economically viable plantation management - thereby integrating the needs of people with those of the environment.

  8. 2001 annual report for the Pend Oreille wetlands wildlife mitigation projects; ANNUAL

    International Nuclear Information System (INIS)

    Entz, Ray D.

    2001-01-01

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie

  9. Habitat Evaluation Procedures (HEP) Report; Iskuulpa Wildlife Mitigation and Watershed Project, Technical Report 1998-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Quaempts, Eric

    2003-01-01

    , and the allowance of normative processes such as fire occurrence. Implementation of these alternatives could generate an estimated minimum of 393 enhancement credits in 10 years. Longer-term benefits of protection and enhancement activities include increases in native species diversity and structural complexity in all cover types. While such benefits are not readily recognized by HEP models and reflected in the number of habitat units generated, they also provide dual benefits for fisheries resources. Implementation of the alternatives will require long-term commitments from managers to increase probabilities of success and meet the goals and objectives of the Northwest Power Planning Council's Fish and Wildlife Mitigation Program.

  10. Planning for climate change on the National Wildlife Refuge System

    Science.gov (United States)

    B. Czech; S. Covington; T. M. Crimmins; J. A. Ericson; C. Flather; M. Gale; K. Gerst; M. Higgins; M. Kaib; E. Marino; T. Moran; J. Morton; N. Niemuth; H. Peckett; D. Savignano; L. Saperstein; S. Skorupa; E. Wagener; B. Wilen; B. Wolfe

    2014-01-01

    This document originated in 2008 as a collaborative project of the U.S. Fish and Wildlife Service (FWS) and the University of Maryland's Graduate Program in Sustainable Development and Conservation Biology. The original title was A Primer on Climate Change for the National Wildlife Refuge System. The Primer has evolved into Planning for Climate Change on the...

  11. Structural master plan of flood mitigation measures

    Directory of Open Access Journals (Sweden)

    A. Heidari

    2009-01-01

    Full Text Available Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possibility of flood overtopping. Different flood mitigation alternatives are investigated from various aspects in the Dez and Karun river floodplain areas as a case study in south west of IRAN. The results show that detention dam and flood diversion are the best alternatives of flood mitigation methods as well as enforcing the flood control purpose of upstream multipurpose reservoirs. Dyke and levees are not mostly justifiable because of negative impact on down stream by enhancing routed flood peak discharge magnitude and flood damages as well.

  12. Integration of Regional Mitigation Assessment and Conservation Planning

    Directory of Open Access Journals (Sweden)

    James H. Thorne

    2009-06-01

    Full Text Available Government agencies that develop infrastructure such as roads, waterworks, and energy delivery often impact natural ecosystems, but they also have unique opportunities to contribute to the conservation of regional natural resources through compensatory mitigation. Infrastructure development requires a planning, funding, and implementation cycle that can frequently take a decade or longer, but biological mitigation is often planned and implemented late in this process, in a project-by-project piecemeal manner. By adopting early regional mitigation needs assessment and planning for habitat-level impacts from multiple infrastructure projects, agencies could secure time needed to proactively integrate these obligations into regional conservation objectives. Such practice can be financially and ecologically beneficial due to economies of scale, and because earlier mitigation implementation means potentially developable critical parcels may still be available for conservation. Here, we compare the integration of regional conservation designs, termed greenprints, with early multi-project mitigation assessment for two areas in California, USA. The expected spatial extent of habitat impacts and associated mitigation requirements from multiple projects were identified for each area. We used the reserve-selection algorithm MARXAN to identify a regional greenprint for each site and to seek mitigation solutions through parcel acquisition that would contribute to the greenprint, as well as meet agency obligations. The two areas differed in the amount of input data available, the types of conservation objectives identified, and local land-management capacity. They are representative of the range of conditions that conservation practitioners may encounter, so contrasting the two illustrates how regional advanced mitigation can be generalized for use in a wide variety of settings. Environmental organizations can benefit from this approach because it provides a

  13. 76 FR 30190 - Atchafalaya National Wildlife Refuge, LA; Draft Comprehensive Conservation Plan and Environmental...

    Science.gov (United States)

    2011-05-24

    ... on the importance of the habitat for wildlife, management, and access. Administrative plans would... . Alternatively, you may download the document from our Internet Site at http://southeast.fws.gov/planning under... fish and wildlife management, conservation, legal mandates, and our policies. In addition to outlining...

  14. Global research priorities to mitigate plastic pollution impacts on marine wildlife

    Science.gov (United States)

    Vegter, Amanda C.; Barletta, Mário; Beck, Cathy A.; Borrero, Jose C.; Burton, Harry; Campbell, Marnie L.; Costa, Monica F.; Eriksen, Marcus; Eriksson, Cecilia; Estrades, Andres; Gilardi, Kirsten V.; Hardesty, Britta D.; do Sul, Juliana A. Ivar; Lavers, Jennifer L.; Lazar, Bojan; Lebreton, Laurent; Nichols, Wallace J.; Ribic, Christine A.; Ryan, Peter G.; Schuyler, Qamar A.; Smith, Stephen D. A.; Takada, Hideshige; Townsend, Kathy A.; Wabnitz, Colette C. C.; Wilcox, Chris; Young, Lindsay C.; Hamann, Mark

    2014-01-01

    Marine wildlife faces a growing number of threats across the globe, and the survival of many species and populations will be dependent on conservation action. One threat in particular that has emerged over the last 4 decades is the pollution of oceanic and coastal habitats with plastic debris. The increased occurrence of plastics in marine ecosystems mirrors the increased prevalence of plastics in society, and reflects the high durability and persistence of plastics in the environment. In an effort to guide future research and assist mitigation approaches to marine conservation, we have generated a list of 16 priority research questions based on the expert opinions of 26 researchers from around the world, whose research expertise spans several disciplines, and covers each of the world’s oceans and the taxa most at risk from plastic pollution. This paper highlights a growing concern related to threats posed to marine wildlife from microplastics and fragmented debris, the need for data at scales relevant to management, and the urgent need to develop interdisciplinary research and management partnerships to limit the release of plastics into the environment and curb the future impacts of plastic pollution.

  15. Coeur d'Alene Tribe Fish and Wildlife Program Habitat Protection Plan; Implementation of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation, 1997-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Vitale, Angelo; Roberts, Frank; Peters, Ronald

    2002-06-01

    , including the Coeur d'Alene Indian Reservation (Coeur d'Alene Tribe 1998). Implicit in this statement is a commitment to provide native subsistence resources in the present and near future as well as the long-term by employing all the mitigation and conservation measures available to them. The development of this Habitat Protection Plan is intended to provide additional planning level guidance as the implementation of conservation measures moves forward. The purpose of this plan is to develop a systematic approach to habitat restoration that will ultimately lead to self-perpetuating, harvestable populations of native fish, wildlife and botanical species. Specifically, it is our intention to apply the principles and analyses presented in this plan to prioritize future restoration efforts that receive funding under the Northwest Power Planning Council's Resident Fish and Wildlife Mitigation Programs. Using an ecosystem restoration approach based on landscape ecology concepts (Primack 1993), the basic premise of the plan is to (1) protect functioning habitat conditions and (2) restore degraded habitat conditions. This plan focuses on habitat conditions at the watershed scale (macrohabitat) rather than on the needs of single species and/or species guilds. By focusing restoration efforts at a macrohabitat level, restoration efforts target all native species inhabiting that area. This approach marks a paradigm shift that emphasizes ecological based restoration rather than species-specific restoration. Traditionally, fish managers and wildlife managers have approached restoration independently, often dedicating resources to a single species by focusing on specific habitat types on a small spatial scale (microhabitat) (Robinson and Bolen 1989, Marcot et al. 2002). This management technique has done little to curb declines despite large budgets (Pianka 1994). Restoration on a landscape level has shown promising results (Holling 1992) and many riparian and wetland

  16. Mitigative measures for the Laforge-2 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1995-01-01

    Corrective, preventive and enhancement measures undertaken as part of the development of the Laforge-2 Hydroelectric Power Plant, were described. The environment into which the project has been integrated was also described. General background information and technical characteristics of the Laforge-2 and Caniapiscau-Laforge diversion were provided. The Laforge-2 Mitigative Master Plan's measures for improving wildlife potential, cleaning-up of tributaries, protecting wildlife habitats, seeding around ponds and humid zones, installing platforms to encourage and facilitate the nesting of ospreys, and promoting proper harvesting of the territory, were described as corrective measures that will promote sustainable development. Contractual obligations to protect the environment were outlined. Enhancement measures described included reclamation of areas disturbed during construction, landscaping around main structures and construction of scenic lookouts. It was fully expected that the mitigative measures described for the Laforge-2 project will minimize negative impacts of the project and will maximize positive ones by improving wildlife potential in areas near the reservoir. 5 figs

  17. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  18. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  19. Tarague Interpretive Trail Mitigation Plan

    National Research Council Canada - National Science Library

    Welch, David

    2001-01-01

    ...), International Archaeological Research Institute, Inc. (lARfI) has prepared a mitigation plan for development of an interpretive trail at Tarague Beach, located on the north coast of the island of Guam (Fig. 1...

  20. Species distributions models in wildlife planning: agricultural policy and wildlife management in the great plains

    Science.gov (United States)

    Fontaine, Joseph J.; Jorgensen, Christopher; Stuber, Erica F.; Gruber, Lutz F.; Bishop, Andrew A.; Lusk, Jeffrey J.; Zach, Eric S.; Decker, Karie L.

    2017-01-01

    We know economic and social policy has implications for ecosystems at large, but the consequences for a given geographic area or specific wildlife population are more difficult to conceptualize and communicate. Species distribution models, which extrapolate species-habitat relationships across ecological scales, are capable of predicting population changes in distribution and abundance in response to management and policy, and thus, are an ideal means for facilitating proactive management within a larger policy framework. To illustrate the capabilities of species distribution modeling in scenario planning for wildlife populations, we projected an existing distribution model for ring-necked pheasants (Phasianus colchicus) onto a series of alternative future landscape scenarios for Nebraska, USA. Based on our scenarios, we qualitatively and quantitatively estimated the effects of agricultural policy decisions on pheasant populations across Nebraska, in specific management regions, and at wildlife management areas. 

  1. An Integrated Approach to Mitigation Wetland Site Selection: A Case Study in Gwacheon, Korea

    Directory of Open Access Journals (Sweden)

    Junga Lee

    2015-03-01

    Full Text Available This paper presents an integrated approach to mitigation wetland site selection using functional landscape connectivity and landscape structure. This approach enables landscape designers to evaluate the relative priorities of mitigation wetland areas based on functional landscape connectivity and wildlife mobility, as well as landscape structure, composition, and configuration. The least-cost path method is used to evaluate candidate sites for mitigation wetlands with regard to wildlife movement. A set of assessments for landscape indices using FRAGSTATS was applied to identify suitable mitigation wetland areas on the basis of landscape connectivity, composition, and configuration. The study was conducted in Gwacheon, Korea, where there are plans for regional development that will change the landscape. In the first step, a group of 14 candidate sites is identified via analysis of functional landscape connectivity using the least-cost path method. In the second step, candidate mitigation wetland areas are ranked according to landscape connectivity and composition. The five mitigation wetland areas that were found to be suitable were analyzed based on landscape configuration at the class level. This study demonstrates that functional landscape connectivity and landscape structure are important aspects to consider when identifying suitable sites for mitigation wetland planning and restoration.

  2. A World Wide Web Human Dimensions Framework and Database for Wildlife and Forest Planning

    Science.gov (United States)

    Michael A. Tarrant; Alan D. Bright; H. Ken Cordell

    1999-01-01

    The paper describes a human dimensions framework(HDF) for application in wildlife and forest planning. The HDF is delivered via the world wide web and retrieves data on-line from the Social, Economic, Environmental, Leisure, and Attitudes (SEELA) database. The proposed HDF is guided by ten fundamental HD principles, and is applied to wildlife and forest planning using...

  3. Planning for people? An evaluation of objectives for managing visitors at wildlife refuges in the United States

    Science.gov (United States)

    Jeffrey J. Brooks; Robert Massengale

    2011-01-01

    This study evaluates the quality of planning objectives for visitor services as written in Comprehensive Conservation Plans for the National Wildlife Refuge System of the United States. Planners in the U.S. Fish and Wildlife Service are predominantly writing public use objectives that address wildlife recreation and education. Results indicate that planners are writing...

  4. Planning in the human ecotone: Managing wild places on the Togiak National Wildlife Refuge

    Science.gov (United States)

    Stewart Allen

    2002-01-01

    The U.S. Fish and Wildlife Service is revising the long-range plan for Alaska’s Togiak National Wildlife Refuge, over half of which is designated as the Togiak Wilderness Area. Many of the planning issues are social rather than biological, involving public use and its effects on Refuge resources and opportunities. Planners, managers, and stakeholders are finding...

  5. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

  6. Wetland Mitigation Monitoring at the Fernald Preserve - 13200

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Jane [Fernald Preserve Site Manager, DOE Office of Legacy Management, Harrison, Ohio (United States); Bien, Stephanie; Decker, Ashlee; Homer, John [Environmental Scientist, S.M. Stoller Corporation, Harrison, Ohio (United States); Wulker, Brian [Intern, S.M. Stoller Corporation, Harrison, Ohio (United States)

    2013-07-01

    The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluated from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)

  7. Wetland Mitigation Monitoring at the Fernald Preserve - 13200

    International Nuclear Information System (INIS)

    Powell, Jane; Bien, Stephanie; Decker, Ashlee; Homer, John; Wulker, Brian

    2013-01-01

    The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluated from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)

  8. 76 FR 30957 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Draft Recovery Plan...

    Science.gov (United States)

    2011-05-27

    ... and Threatened Wildlife and Plants (List). Recovery plans help guide our recovery efforts by...] Endangered and Threatened Wildlife and Plants; Notice of Availability of a Draft Recovery Plan, First... plan, you may submit your comments in writing by any one of the following methods: U.S. mail: Field...

  9. 76 FR 24511 - Cabo Rojo National Wildlife Refuge, Cabo Rojo, Puerto Rico; Draft Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-05-02

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-R-2010-N277; 40136-1265-0000-S3] Cabo Rojo National Wildlife Refuge, Cabo Rojo, Puerto Rico; Draft Comprehensive Conservation Plan and... draft comprehensive conservation plan and environmental assessment (Draft CCP/EA) for Cabo Rojo National...

  10. 44 CFR 201.4 - Standard State Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... location of all natural hazards that can affect the State, including information on previous occurrences of... updating the plan. (ii) A system for monitoring implementation of mitigation measures and project closeouts...

  11. 75 FR 56131 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Science.gov (United States)

    2010-09-15

    ... on the MOCA network recommended in the 2008 Recovery Plan and will instead use the model results to... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N184; 10120-1113-0000-C2] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl...

  12. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    International Nuclear Information System (INIS)

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoring program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program

  13. Oil spill response planning, training and facilities for wildlife in Prince William Sound, Alaska

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1996-01-01

    The special provisions of the SERVS System of the Alyeska Pipeline Service Company concerning the treatment of wildlife in the event of an oil spill, were described. The Company is prepared to mobilize a rapid response for protection and treatment of wildlife in the event of an oil spill anywhere along the trans-Alaska pipeline or in Prince William Sound. Equipment for hazing, capture, and treatment is pre-assembled and staged at facilities at the Valdez Marine Terminal. Veterinarians and wildlife treatment specialists are under contract for treating oiled birds. This complex of wildlife response capabilities meets or exceeds the guidelines and response planning standards set by wildlife agencies. 7 refs., 6 figs

  14. 78 FR 20687 - Nantucket National Wildlife Refuge, Nantucket, MA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2013-04-05

    ... impacts on the human environment, which we included in the draft CCP/EA. The CCP will guide us in managing... plan for achieving refuge purposes and contributing toward the mission of the National Wildlife Refuge... implemented primarily by partners, such as TTOR. Priority public uses, such as wildlife observation...

  15. 76 FR 4719 - Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife...

    Science.gov (United States)

    2011-01-26

    ... guides and transporters to maintain big game hunting opportunities while reducing social conflict in the...] Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife Refuge... period for the Revised Comprehensive Conservation Plan and Environmental Assessment for Selawik National...

  16. 76 FR 38575 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Northern Spotted Owl...

    Science.gov (United States)

    2011-07-01

    ... document availability: revised recovery plan. SUMMARY: We, the U.S. Fish and Wildlife Service, announce the... concluded that the integrity of the agency decisionmaking process for the spotted owl recovery plan was... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [FWS-R1-ES-2011-N020; 10120...

  17. 75 FR 15723 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Mariana Fruit...

    Science.gov (United States)

    2010-03-30

    ... Wildlife Service, announce the availability of the Draft Revised Recovery Plan for the Mariana Fruit Bat or... and assistance of a Recovery Team appointed by the U.S. Fish and Wildlife Service. Section 4(f) of the... life history and ecology, this recovery plan focuses on the first 10 years of the recovery process. As...

  18. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  19. 76 FR 36143 - Bombay Hook National Wildlife Refuge, Kent County, DE; Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-06-21

    ... public meetings. You can obtain the schedule from the refuge manager or planning team leader (see FOR... INFORMATION CONTACT: Michael Stroeh, Project Leader, Bombay Hook National Wildlife Refuge, 2591 Whitehall Neck... establishment. Farming is still considered a viable wildlife management tool, but the role of the farming...

  20. Citizen, Science, Highways, and Wildlife: Using a Web-based GIS to Engage Citizens in Collecting Wildlife Information

    Directory of Open Access Journals (Sweden)

    Tracy Lee

    2006-06-01

    Full Text Available Road Watch in the Pass is a citizen-science project that engages local citizens in reporting wildlife observations along a 44-km stretch of Highway 3 through Crowsnest Pass in southwestern Alberta, Canada. The numbers of wildlife vehicle collisions and a recent proposal to expand the highway have raised concerns from both human safety and wildlife conservation perspectives. Through the use of a web-based GIS, interested citizens can contribute information that will be instrumental in making final decisions concerning measures to mitigate the effects of highway expansion. Currently, 58 people have contributed over 713 observations to Road Watch. We performed a preliminary comparison of 11 months of Road Watch observations and wildlife mortality data for the same time period to demonstrate that the use of citizen science not only augments more conventional approaches, but also results in the emergence of new knowledge and insights. A Kappa index of agreement of 14% indicates poor agreement between the data sets, highlighting that wildlife successfully cross the highway in areas not identified by the wildlife mortality data. This has important implications for design and mitigation efforts for Highway 3 and other roadways.

  1. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  2. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  3. Fish & Wildlife Annual Project Summary, 1983.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  4. 75 FR 56130 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Comprehensive Conservation Plan and...

    Science.gov (United States)

    2010-09-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-R-2010-N160; 1265-0000-10137-S3] Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Comprehensive Conservation Plan and... Kamehameha Highway, Room 2C, Hale`iwa, HI 96712. Alternatively, you may fax comments to the refuge at (808...

  5. 78 FR 4430 - Chassahowitzka National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of...

    Science.gov (United States)

    2013-01-22

    ... wildlife refuge. The purpose for developing a CCP is to provide refuge managers with a 15-year plan for achieving refuge purposes and contributing toward the mission of the National Wildlife Refuge System... landing will be added to the Dog Island facility. The addition of key positions, such as a law enforcement...

  6. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-05-20

    ...We, the U.S. Fish and Wildlife Service (Service), announce the availability of the Final Comprehensive Conservation Plan (CCP) and Finding of No Significant Impact (FONSI) for the Environmental Assessment (EA) for Swan Lake National Wildlife Refuge (NWR). Goals and objectives in the CCP describe how the agency intends to manage the refuge over the next 15 years.

  7. 76 FR 39890 - St. Johns National Wildlife Refuge, FL; Draft Comprehensive Conservation Plan and Environmental...

    Science.gov (United States)

    2011-07-07

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-R-2011-N053; 40136-1265-0000-S3] St... conservation plan and environmental assessment (Draft CCP/EA) for St. Johns National Wildlife Refuge (NWR) in... Complex, P.O. Box 2683, Titusville, FL 32781, or via e-mail at [email protected] , or St. Johns CCP...

  8. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  9. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  10. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

  11. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2013-03-14

    ...-FF03R06000] Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and... the Environmental Assessment (EA) for Neal Smith National Wildlife Refuge (Refuge, NWR). In this final... . Include ``Neal Smith Final CCP'' in the subject line of the message. U.S. Mail: Neal Smith National...

  12. 78 FR 4865 - Endangered and Threatened Wildlife and Plants; Recovery Plan for the Columbia Basin Distinct...

    Science.gov (United States)

    2013-01-23

    ... the recovery plan are also available by request from the U.S. Fish and Wildlife Service, Eastern... implementing actions, while the recovery actions describe a process for implementing conservation on the ground... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2012-N199; FXES11130100000C2-123...

  13. Improving our legacy: Incorporation of adaptive management into state wildlife action plans

    Science.gov (United States)

    Fontaine, J.J.

    2011-01-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .

  14. The influence of mitigation on sage-grouse habitat selection within an energy development field.

    Directory of Open Access Journals (Sweden)

    Bradley C Fedy

    Full Text Available Growing global energy demands ensure the continued growth of energy development. Energy development in wildlife areas can significantly impact wildlife populations. Efforts to mitigate development impacts to wildlife are on-going, but the effectiveness of such efforts is seldom monitored or assessed. Greater sage-grouse (Centrocercus urophasianus are sensitive to energy development and likely serve as an effective umbrella species for other sagebrush-steppe obligate wildlife. We assessed the response of birds within an energy development area before and after the implementation of mitigation action. Additionally, we quantified changes in habitat distribution and abundance in pre- and post-mitigation landscapes. Sage-grouse avoidance of energy development at large spatial scales is well documented. We limited our research to directly within an energy development field in order to assess the influence of mitigation in close proximity to energy infrastructure. We used nest-location data (n = 488 within an energy development field to develop habitat selection models using logistic regression on data from 4 years of research prior to mitigation and for 4 years following the implementation of extensive mitigation efforts (e.g., decreased activity, buried powerlines. The post-mitigation habitat selection models indicated less avoidance of wells (well density β = 0.18 ± 0.08 than the pre-mitigation models (well density β = -0.09 ± 0.11. However, birds still avoided areas of high well density and nests were not found in areas with greater than 4 wells per km2 and the majority of nests (63% were located in areas with ≤ 1 well per km2. Several other model coefficients differed between the two time periods and indicated stronger selection for sagebrush (pre-mitigation β = 0.30 ± 0.09; post-mitigation β = 0.82 ± 0.08 and less avoidance of rugged terrain (pre-mitigation β = -0.35 ± 0.12; post-mitigation β = -0.05 ± 0.09. Mitigation efforts

  15. Habitat Evaluation Procedures (HEP) Report; Steigerwald Lake National Wildlife Refuge, Technical Report 2000-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna

    2001-09-01

    Steigenvald Lake National Wildlife Refuge (NWR, refuge) was established as a result of the U. S. Army Corps of Engineers (COE) transferring ownership of the Stevenson tract located in the historic Steigerwald Lake site to the U.S. Fish and Wildlife Service (FWS, Service) for the mitigation of the fish and wildlife losses associated with the construction of a second powerhouse at the Bonneville Dam on the Columbia River and relocation of the town of North Bonneville (Public Law 98-396). The construction project was completed in 1983 and resulted in the loss of approximately 577 acres of habitat on the Washington shore of the Columbia River (USFWS, 1982). The COE determined that acquisition and development of the Steigenvald Lake area, along with other on-site project management actions, would meet their legal obligation to mitigate for these impacts (USCOE, 1985). Mitigation requirements included restoration and enhancement of this property to increase overall habitat diversity and productivity. From 1994 to 1999, 317 acres of additional lands, consisting of four tracts of contiguous land, were added to the original refuge with Bonneville Power Administration (BPA) funds provided through the Washington Wildlife Mitigation Agreement. These tracts comprised Straub (191 acres), James (90 acres), Burlington Northern (27 acres), and Bliss (9 acres). Refer to Figure 1. Under this Agreement, BPA budgeted $2,730,000 to the Service for 'the protection, mitigation, and enhancement of wildlife and wildlife habitat that was adversely affected by the construction of Federal hydroelectric dams on the Columbia River or its tributaries' in the state of Washington (BPA, 1993). Lands acquired for mitigation resulting from BPA actions are evaluated using the habitat evaluation procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the Federal Columbia

  16. 77 FR 76065 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm...

    Science.gov (United States)

    2012-12-26

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm Springs Dace... revised recovery plan for the Kendall Warm Springs dace (Rhinichthys osculus thermalis). This species is... recovery plan. The Kendall Warm Springs dace (Rhinichthys osculus thermalis), found only in one location in...

  17. 50 CFR 216.184 - Mitigation.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Mitigation. 216.184 Section 216.184 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... the coast from 47°07′ N. to 48°30′ N. latitude December January, March and May. (9) Flower Garden...

  18. 78 FR 17709 - Endangered and Threatened Wildlife and Plants; Recovery Plan for Rogue and Illinois Valley Vernal...

    Science.gov (United States)

    2013-03-22

    ... localities for implementing actions, while the recovery actions describe a process for implementing... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2012-N198; FXES11130100000C2-123-FF01E00000] Endangered and Threatened Wildlife and Plants; Recovery Plan for Rogue and Illinois Valley Vernal...

  19. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ... to State and regional agencies. (2) Documentation of the State's project implementation capability, identifying and demonstrating the ability to implement the plan, including: (i) Established eligibility...) Demonstration that the State has the capability to effectively manage the HMGP as well as other mitigation grant...

  20. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    International Nuclear Information System (INIS)

    Cada, G.F.

    1996-01-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy's Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality

  1. Human–wildlife conflict and attitude of local people towards ...

    African Journals Online (AJOL)

    Human–wildlife conflict is a serious challenge undermining the integrity of protected areas in developing countries. Developing effective human–wildlife conflict mitigation strategies requires an understanding of the conflict patterns, species involved and attitudes of local people living along protected area boundaries.

  2. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Science.gov (United States)

    2010-09-17

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog AGENCY: Fish... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... and peer reviewers in an appendix to the approved recovery plan. The Utah prairie dog (Cynomys...

  3. Coupling the Biophysical and Social Dimensions of Wildfire Risk to Improve Wildfire Mitigation Planning.

    Science.gov (United States)

    Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige

    2015-08-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.

  4. Threatened and endangered wildlife species of the Hanford Site related to CERCLA characterization activities

    Energy Technology Data Exchange (ETDEWEB)

    Fitzner, R.E. [Pacific Northwest Lab., Richland, WA (United States); Weiss, S.G.; Stegen, J.A. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-06-01

    The US Department of Energy`s (DOE) Hanford Site has been placed on the National Priorities List, which requires that it be remediated under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) or Superfund. Potentially contaminated areas of the Hanford Site were grouped into operable units, and detailed characterization and investigation plans were formulated. The DOE Richland Operations Office requested Westinghouse Hanford Company (WHC) to conduct a biological assessment of the potential impact of these characterization activities on the threatened, endangered, and sensitive wildlife species of the Hanford Site. Additional direction for WHC compliances with wildlife protection can be found in the Environmental Compliance Manual. This document is intended to meet these requirements, in part, for the CERCLA characterization activities, as well as for other work comparable in scope. This report documents the biological assessment and describes the pertinent components of the Hanford Site as well as the planned characterization activities. Also provided are accounts of endangered, threatened, and federal candidate wildlife species on the Hanford Site and information as to how human disturbances can affect these species. Potential effects of the characterization activities are described with recommendations for mitigation measures.

  5. 75 FR 54381 - Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, MT

    Science.gov (United States)

    2010-09-07

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-R-2010-N078; 60138-1261-6CCP-S3] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, MT AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability: Draft comprehensive conservation plan and draft...

  6. Wildlife friendly roads: the impacts of roads on wildlife in urban areas and potential remedies

    Science.gov (United States)

    Riley, Seth P D; Brown, Justin L.; Sikich, Jeff A.; Schoonmaker, Catherine M.; Boydston, Erin E.

    2014-01-01

    Roads are one of the most important factors affecting the ability of wildlife to live and move within an urban area. Roads physically replace wildlife habitat and often reduce habitat quality nearby, fragment the remaining habitat, and cause increased mortality through vehicle collisions. Much ecological research on roads has focused on whether animals are successfully crossing roads, or if the road is a barrier to wildlife movement, gene flow, or functional connectivity. Roads can alter survival and reproduction for wildlife, even among species such as birds that cross roads easily. Here we examine the suite of potential impacts of roads on wildlife, but we focus particularly on urban settings. We report on studies, both in the literature and from our own experience, that have addressed wildlife and roads in urban landscapes. Although road ecology is a growing field of study, relatively little of this research, and relatively few mitigation projects, have been done in urban landscapes. We also draw from the available science on road impacts in rural areas when urban case studies have not fully addressed key topics.

  7. Decision analysis of mitigation and remediation of sedimentation within large wetland systems: a case study using Agassiz National Wildlife Refuge

    Science.gov (United States)

    Post van der Burg, Max; Jenni, Karen E.; Nieman, Timothy L.; Eash, Josh D.; Knutsen, Gregory A.

    2014-01-01

    Sedimentation has been identified as an important stressor across a range of wetland systems. The U.S. Fish and Wildlife Service has the responsibility of maintaining wetlands within its National Wildlife Refuge System for use by migratory waterbirds and other wildlife. Many of these wetlands could be negatively affected by accelerated rates of sedimentation, especially those located in agricultural parts of the landscape. In this report we document the results of a decision analysis project designed to help U.S. Fish and Wildlife Service staff at the Agassiz National Wildlife Refuge (herein referred to as the Refuge) determine a strategy for managing and mitigating the negative effects of sediment loading within Refuge wetlands. The Refuge’s largest wetland, Agassiz Pool, has accumulated so much sediment that it has become dominated by hybrid cattail (Typha × glauca), and the ability of the staff to control water levels in the Agassiz Pool has been substantially reduced. This project consisted of a workshop with Refuge staff, local and regional stakeholders, and several technical and scientific experts. At the workshop we established Refuge management and stakeholder objectives, a range of possible management strategies, and assessed the consequences of those strategies. After deliberating a range of actions, the staff chose to consider the following three strategies: (1) an inexpensive strategy, which largely focused on using outreach to reduce external sediment inputs to the Refuge; (2) the most expensive option, which built on the first option and relied on additional infrastructure changes to the Refuge to increase management capacity; and (3) a strategy that was less expensive than strategy 2 and relied mostly on existing infrastructure to improve management capacity. Despite the fact that our assessments were qualitative, Refuge staff decided they had enough information to select the third strategy. Following our qualitative assessment, we discussed

  8. Oak woodlands as wildlife habitat

    Science.gov (United States)

    W. Tietje; K. Purcell; S. Drill

    2005-01-01

    This chapter provides local planners and policymakers with information on the diversity and abundance of oak woodland wildlife, wildlife habitat needs, and how local planning activities can influence wildlife abundance and diversity. Federal and state laws, particularly the federal and California Endangered Species Act and the California Environmental Quality Act (CEQA...

  9. 77 FR 8890 - Clarks River National Wildlife Refuge, KY; Draft Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-02-15

    ... boundaries would be based on importance of the habitat for target management species. We would offer....fws.gov planning under ``Draft Documents.'' Comments on the Draft CCP/EA may be submitted to the above..., advancement, management, conservation, and protection of fish and wildlife resources. Approximately 74 percent...

  10. 77 FR 24975 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog

    Science.gov (United States)

    2012-04-26

    ...-FF06E00000] Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog... Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened under the... recovery plan for the Utah prairie dog. The Service and other Federal agencies also will take these...

  11. West Valley demonstration project: Implementation of the kerosene mitigation plan

    International Nuclear Information System (INIS)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab

  12. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-11-18

    ...] Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan and.../docs/HI-PI/docsjcpearl.htm . Email: [email protected] . Include ``Pearl Harbor final CCP'' in...`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project Leader, (808) 637-6330...

  13. The role of green corridors for wildlife conservation in urban landscape: A literature review

    International Nuclear Information System (INIS)

    Aziz, H A; Rasidi, M H

    2014-01-01

    Green corridors are an attempt to mitigate negative effects of the built environment of cities and towns. The corridors act as conservation for rapidly extreme intervention and development of the urban environment. Most importantly, it enables dispersal movement of animals within city areas. Issues relate to wildlife conservation in urban areas has been studied for many years and thus, the research makes a review for how the green corridors contribute to the conservation of urban wildlife. This study reviews groups of articles in disciplines of urban landscape planning and biology conservation to discuss the relationship between elements of green corridors and urban wildlife dispersal movement behaviour in Malaysian context. Accordingly, this research is purposely studied to give understanding on how green corridors contribute to the animals' ability of moving and dispersing within the built-up areas. In advance, it is found that there are three factors contribute to the capability of colonization among urban wildlife which are individual, physical and social factor. Green corridor has been defined as one of the physical factor that influence urban wildlife behaviour movement. Consequently, safety area indicating to animals species for traversing in any time such as at night can be defined as the primary potential corridor

  14. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  15. Local climate action plans in climate change mitigation

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2016-01-01

    the extent, targets and scope of LG CAPs and find that Danish LGs are highly involved in mitigation activities with a widespread CAP adoption and an overall high degree of sectoral coverage on base year accounts and action plans, albeit with some significant shortcomings. Different approaches for target...... and scope definition are identified and assessed, and the overall contribution of LGs to the Danish energy transition is discussed....

  16. Wildlife Inventory, Craig Mountain, Idaho.

    Energy Technology Data Exchange (ETDEWEB)

    Cassirer, E. Frances

    1995-06-01

    Wildlife distribution/abundance were studied at this location during 1993 and 1994 to establish the baseline as part of the wildlife mitigation agreement for construction of Dworshak reservoir. Inventory efforts were designed to (1) document distribution/abundance of 4 target species: pileated woodpecker, yellow warbler, black-capped chickadee, and river otter, (2) determine distribution/abundance of rare animals, and (3) determine presence and relative abundance of all other species except deer and elk. 201 wildlife species were observed during the survey period; most were residents or used the area seasonally for breeding or wintering. New distribution or breeding records were established for at least 6 species. Pileated woodpeckers were found at 35% of 134 survey points in upland forests; estimated densities were 0-0.08 birds/ha, averaging 0.02 birds/ha. Yellow warblers were found in riparian areas and shrubby draws below 3500 ft elev., and were most abundant in white alder plant communities (ave. est. densities 0.2-2. 1 birds/ha). Black-capped chickadees were found in riparian and mixed tall shrub vegetation at all elevations (ave. est. densities 0-0.7 birds/ha). River otters and suitable otter denning and foraging habitat were observed along the Snake and Salmon rivers. 15 special status animals (threatened, endangered, sensitive, state species of special concern) were observed at Craig Mt: 3 amphibians, 1 reptile, 8 birds, 3 mammals. Another 5 special status species potentially occur (not documented). Ecosystem-based wildlife management issues are identified. A monitoring plant is presented for assessing effects of mitigation activities.

  17. 1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan

    International Nuclear Information System (INIS)

    1997-11-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities. Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long's Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long's Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient

  18. Benefits of the fire mitigation ecosystem service in the Great Dismal Swamp National Wildlife Refuge, Virginia, USA

    Science.gov (United States)

    Parthum, Bryan M.; Pindilli, Emily J.; Hogan, Dianna

    2017-01-01

     The Great Dismal Swamp (GDS) National Wildlife Refuge delivers multiple ecosystem services, including air quality and human health via fire mitigation. Our analysis estimates benefits of this service through its potential to reduce catastrophic wildfire related impacts on the health of nearby human populations. We used a combination of high-frequency satellite data, ground sensors, and air quality indices to determine periods of public exposure to dense emissions from a wildfire within the GDS. We examined emergency department (ED) visitation in seven Virginia counties during these periods, applied measures of cumulative Relative Risk to derive the effects of wildfire smoke exposure on ED visitation rates, and estimated economic losses using regional Cost of Illness values established within the US Environmental Protection Agency BenMAP framework. Our results estimated the value of one avoided catastrophic wildfire in the refuge to be \\$3.69 million (2015 USD), or \\$306 per hectare of burn. Reducing the frequency or severity of extensive, deep burning peatland wildfire events has additional benefits not included in this estimate, including avoided costs related to fire suppression during a burn, carbon dioxide emissions, impacts to wildlife, and negative outcomes associated with recreation and regional tourism. We suggest the societal value of the public health benefits alone provides a significant incentive for refuge mangers to implement strategies that will reduce the severity of catastrophic wildfires.

  19. Social and economic considerations for planning wildlife conservation in large landscapes

    Science.gov (United States)

    Robert G. Haight; Paul H. Gobster

    2009-01-01

    People conserve wildlife for a variety of reasons. People conserve wildlife because they enjoy wildlife-related activities such as recreational hunting, wildlife viewing, or ecotourism that satisfy many personal and social values associated with people's desire to connect with each other and with nature (Decker et al. 2001). People conserve wildlife because it...

  20. Establishing Baseline Key Ecological Functions of Fish and Wildlife for Subbasin Planning, Final Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    O' Neil, Thomas A.

    2001-08-01

    prioritizing inventory, monitoring, and mitigation efforts with ecosystem-based management. This project uses the species distributions in conjunction with a set of wildlife-habitat relationship matrices to construct and assess a functional analysis for each of the 62 subbasins. The analysis compares functional changes from historic to current conditions across the Columbia River Basin and address community functional patterns, geographic functional patterns, and species functional roles. Products from this work include: (1) current distribution maps for fish and wildlife species (including winter range maps for birds); (2) historic distribution maps for native fish and wildlife species; (3) list of KEFs for each anadromous, resident fish, and wildlife species (species functional profiles); (4) KEF assessment of community and geographic functional patterns for each of the 62 subbasins in the Columbia River Basin; and (5) a set of functional profiles based on the species and wildlife-habitat occurrence within each subbasin.

  1. Mixer pump long term operations plan for Tank 241-SY-101 mitigation

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1994-01-01

    This document provides the general Operations Plan for performance of the mixer pump long term operations for Tank 241-SY-101 mitigation of gas retention and periodic release in Tank 101-SY. This operations plan will utilize a 112 kW (150 hp) mixing pump to agitate/suspend the particulates in the tank

  2. Planning regional energy system in association with greenhouse gas mitigation under uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y.P.; Huang, G.H. [Research Academy of Energy and Environmental Studies, North China Electric Power University, Beijing 102206 (China); Chen, X. [Key Laboratory of Oasis Ecology and Desert Environment, Xinjiang Institute of Ecology and Geography, Chinese Academy of Sciences, Urumqi, Xinjiang 830011 (China)

    2011-03-15

    Greenhouse gas (GHG) concentrations are expected to continue to rise due to the ever-increasing use of fossil fuels and ever-boosting demand for energy. This leads to inevitable conflict between satisfying increasing energy demand and reducing GHG emissions. In this study, an integrated fuzzy-stochastic optimization model (IFOM) is developed for planning energy systems in association with GHG mitigation. Multiple uncertainties presented as probability distributions, fuzzy-intervals and their combinations are allowed to be incorporated within the framework of IFOM. The developed method is then applied to a case study of long-term planning of a regional energy system, where integer programming (IP) technique is introduced into the IFOM to facilitate dynamic analysis for capacity-expansion planning of energy-production facilities within a multistage context to satisfy increasing energy demand. Solutions related fuzzy and probability information are obtained and can be used for generating decision alternatives. The results can not only provide optimal energy resource/service allocation and capacity-expansion plans, but also help decision-makers identify desired policies for GHG mitigation with a cost-effective manner. (author)

  3. Sharp-tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project

    International Nuclear Information System (INIS)

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation

  4. Tooling up urban planning for climate change mitigation in Malaysian cities

    International Nuclear Information System (INIS)

    Chau, L W; Yap, Z C; Ho, C S

    2014-01-01

    The city's 2-dimensional spatial structure and 3-dimensional form significantly influence its energy and GHG emission intensity. In rapidly developing urban-regions, the ability of the local planning authorities to quantify the spatial structure and form of existing urban areas, new developments and the emergent urban-region in terms of GHG emission is vital to any effective local, national and global climate change mitigation effort. While a wide array of tools has been developed for assessing built environment sustainability at various spatial scales, these are predominantly eco-efficiency rating tools that do not model the 'spatial structure-GHG' relationship and do not illustrate the GHG implications of urban structure and form, which crucially inform local planning decisions with respect to climate change mitigation. This paper takes the first steps in analysing three spatial-based planning models (Envision Tomorrow, GHGProof, URBEMIS) that estimate GHG emissions towards assessing their adaptability for application in Malaysian cities. It looks into the models' i nner working , unpacking the variables and their relationships; assumptions and conversion rates used; and their data requirement and structure. The models' characteristics and features are critically compared to evaluate their capabilities, limitations and relevance to the Malaysian urban planning context, particularly in terms of data availability

  5. Columbia River System Operation Review final environmental impact statement. Appendix S: U.S. Fish and Wildlife Service Coordination Act Report

    International Nuclear Information System (INIS)

    1995-11-01

    This document constitutes the report of the US Fish and Wildlife Service (FWS) relating to the proposed Columbia River System Operation Review (SOR). The SOR proposed alternative consists of a number of specific water management manipulations and new management targets for operating the network of existing Federal Columbia River Power System dams and facilities. This report, therefore, presents a broader, ecosystem planning and management approach for evaluating and resolving those operational and biological uncertainties. Potential mitigation, enhancement and restoration actions associated with the preferred alternative will require an adaptive implementation approach. At the present time and as further changes anticipated in SOR operations occur, the complete, ecosystemwide, synergistic effects of the operation of the current Federal Columbia River Power System cannot be adequately ascertained. However, the initial elements of ecosystem-based remedies are presented in Sections 4 and 5 of this report. These remedies are intended to stimulate action to help conserve distressed fish and wildlife populations, while furthering understanding of the impacts of the SOR preferred alternative on the ecosystem. This Coordination Act Report is the first attempt to integrate fish and wildlife mitigation, enhancement, recovery and restoration needs with the proposed action and the existing Federal Columbia River Power System

  6. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    Science.gov (United States)

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  7. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  8. Establishing baseline key ecological functions of fish and wildlife for subbasin planning, final report 2001.; FINAL

    International Nuclear Information System (INIS)

    O'Neil, Thomas A.

    2001-01-01

    prioritizing inventory, monitoring, and mitigation efforts with ecosystem-based management. This project uses the species distributions in conjunction with a set of wildlife-habitat relationship matrices to construct and assess a functional analysis for each of the 62 subbasins. The analysis compares functional changes from historic to current conditions across the Columbia River Basin and address community functional patterns, geographic functional patterns, and species functional roles. Products from this work include: (1) current distribution maps for fish and wildlife species (including winter range maps for birds); (2) historic distribution maps for native fish and wildlife species; (3) list of KEFs for each anadromous, resident fish, and wildlife species (species functional profiles); (4) KEF assessment of community and geographic functional patterns for each of the 62 subbasins in the Columbia River Basin; and (5) a set of functional profiles based on the species and wildlife-habitat occurrence within each subbasin

  9. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Easterbrooks, John A.; Pearsons, Todd N. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-03-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council (Columbia River Basin Fish and Wildlife Program 1994, Measure 7.4K). The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington

  10. Decision-support tools for climate change mitigation planning

    DEFF Research Database (Denmark)

    Puig, Daniel; Aparcana Robles, Sandra Roxana

    . For example, in the case of life-cycle analysis, the evaluation criterion entails that the impacts of interest are examined across the entire life-cycle of the product under study, from extraction of raw materials, to product disposal. Effectively, then, the choice of decision-support tool directs......This document describes three decision-support tools that can aid the process of planning climate change mitigation actions. The phrase ‘decision-support tools’ refers to science-based analytical procedures that facilitate the evaluation of planning options (individually or compared to alternative...... options) against a particular evaluation criterion or set of criteria. Most often decision-support tools are applied with the help of purpose-designed software packages and drawing on specialised databases.The evaluation criteria alluded to above define and characterise each decision-support tool...

  11. 77 FR 9692 - Keālia Pond National Wildlife Refuge and Kakahai`a National Wildlife Refuge, Maui County, HI...

    Science.gov (United States)

    2012-02-17

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-R-2011-N228;1265-0000-10137-S3] Ke[amacr]lia Pond National Wildlife Refuge and Kakahai`a National Wildlife Refuge, Maui County, HI; Final Comprehensive Conservation Plans and Findings of No Significant Impact for the Environmental Assessments AGENCY...

  12. Shillapoo Wildlife Area, Annual Report 2007-2008.

    Energy Technology Data Exchange (ETDEWEB)

    Calkins, Brian

    2007-10-01

    This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 08 contract period October 1, 2007-September 30, 2008. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. Significant progress was realized in almost all major work types. Of particular note was progress made in tree plantings and pasture rehabilitation efforts. This year's tree planting effort included five sites detailed below and in terms of the number of plants was certainly the largest effort on the wildlife area to date in one season. The planting itself took a significant amount of time, which was anticipated. However, installation of mats and tubes took much longer than expected which impacted planned fence projects in particular. Survival of the plantings appears to be good. Improvement to the quality of waterfowl pasture habitats is evident on a number of sites due to replanting and weed control efforts. Continuing long-term weed control efforts will be key in improving this particular type of habitat. A prolonged cold, wet spring and a number of equipment breakdowns presented stumbling blocks that impacted schedules and ultimately progress on planned activities. The unusual spring weather delayed fieldwork on pasture planting projects as well as weed control and slowed the process of maintaining trees and shrubs. This time lag also caused the continued deferral of some of our fencing projects. The large brush hog mower had the driveline break twice and the smaller tractor had an engine failure that caused it to be down for over a month. We have modified our budget plan for next

  13. Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements

    Science.gov (United States)

    McKinley, David

    2008-01-01

    The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.

  14. 75 FR 52546 - Hakalau Forest National Wildlife Refuge, Hawai`i County, HI; Comprehensive Conservation Plan and...

    Science.gov (United States)

    2010-08-26

    ...] Hakalau Forest National Wildlife Refuge, Hawai`i County, HI; Comprehensive Conservation Plan and...; Hilo, HI 96720. Alternatively, you may fax comments to the refuge at (808) 443-2304, or e-mail them to... attend two open house meetings. The meetings were held March 3 and 4, 2009, in Hilo, HI, and Captain Cook...

  15. Socioeconomic monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the SMMP is to document compliance with the NWPA. In order to do so, a summary description of site characterization activities based on the consultation draft of the Site Characterization Plan and the final EA is provided. Subsequent chapters identify issues related to the potential for significant adverse impacts and the monitoring plans proposed to determine whether those impacts occur. Should monitoring confirm the potential for significant adverse impact, mitigative maesures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicable, any significant adverse environmental impacts. Proposed site characterization activites involve a variety of surface and subsurface activities including site preparation, access road construction and improvment, exploratory drilling and testing, geophysical surveys, geological mapping, and construction of the exploratory shaft facility. It is not anticipated that any significant adverse socioeconomic impacts will result form any of the proposed site characterization activities. However, the assessment of impacts in the EA, especially impacts related to employment and population growth, was based on assumptions concerning activities and conditions during the site characterization phase

  16. New Tsunami Response, Mitigation, and Recovery Planning "Playbooks" for California (USA) Maritime Communities

    Science.gov (United States)

    Wilson, R. I.; Lynett, P. J.; Miller, K.; Eskijian, M.; Dengler, L. A.; Ayca, A.; Keen, A.; Admire, A. R.; Siegel, J.; Johnson, L. A.; Curtis, E.; Hornick, M.

    2015-12-01

    The 2010 Chile and 2011 Japan tsunamis both struck the California coast offering valuable experience and raised a number of significant issues for harbor masters, port captains, and other maritime entities. There was a general call for more planning products to help guide maritime communities in their tsunami response, mitigation, and recovery activities. The State of California is working with the U.S. Federal Emergency Management Agency (FEMA), the U.S. National Tsunami Hazard Mitigation Program (NTHMP), and other tsunami experts to provide communities with new tsunami planning tools to address these issues: Response Playbooks and plans have been developed for ports and harbors identifying potential tsunami current hazards and related damage for various size events. Maps have been generated showing minor, moderate, and severe damage levels that have been linked to current velocity thresholds of 3, 6, and 9 knots, respectively. Knowing this information allows harbor personnel to move ships or strengthen infrastructure prior to the arrival of distant source tsunamis. Damage probability tools and mitigation plans have been created to help reduce tsunami damage by evaluating the survivability of small and large vessels in harbors and ports. These results were compared to the actual damage assessments performed in California and Japan following the 2011 Japanese tsunami. Fragility curves were developed based on current velocity and direction to help harbor and port officials upgrade docks, piles, and related structures. Guidance documents are being generated to help in the development of both local and statewide recovery plans. Additional tools, like post-tsunami sediment and debris movement models, will allow harbors and ports to better understand if and where recovery issues are most likely to occur. Streamlining the regulatory and environmental review process is also a goal of the guidance. These maritime products and procedures are being integrated into guidance

  17. 30 CFR 784.21 - Fish and wildlife information.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Fish and wildlife information. 784.21 Section... PLAN § 784.21 Fish and wildlife information. (a) Resource information. Each application shall include fish and wildlife resource information for the permit area and adjacent area. (1) The scope and level...

  18. 30 CFR 780.16 - Fish and wildlife information.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Fish and wildlife information. 780.16 Section... PLAN § 780.16 Fish and wildlife information. (a) Resource information. Each application shall include fish and wildlife resource information for the permit area and adjacent area. (1) The scope and level...

  19. Human-wildlife interactions in urban areas: a review of conflicts, benefits and opportunities

    OpenAIRE

    Soulsbury, Carl D.; White, Piran C. L.

    2015-01-01

    Wildlife has existed in urban areas since records began. However, the discipline of urban ecology is relatively new and one that is undergoing rapid growth. All wildlife in urban areas will interact with humans to some degree. With rates of urbanisation increasing globally, there is a pressing need to understand the type and nature of human-wildlife interactions within urban environments, to help manage, mitigate or even promote these interactions. Much research attention has focussed on th...

  20. ANALYZE THE IMPACT OF HABITAT PATCHES ON WILDLIFE ROAD-KILL

    OpenAIRE

    Seok, S.; Lee, J.

    2015-01-01

    The ecosystem fragmentation due to transportation infrastructure causes a road-kill phenomenon. When making policies for mitigating road-kill it is important to select target-species in order to enhance its efficiency. However, many wildlife crossing structures have been questioned regarding their effectiveness due to lack of considerations such as target-species selection, site selection, management, etc. The purpose of this study is to analyse the impact of habitat patches on wildlife road-...

  1. Wildlife management using the AHP

    Directory of Open Access Journals (Sweden)

    L.P. Fatti

    2003-12-01

    Full Text Available Two applications of Saaty's Analytic Hierarchy Process towards solving decision problems in Wildlife Management are discussed. The first involves structuring the management objectives of a National Park and establishing priorities for the implementation of various possible strategic management plans in the Park. The second deals with the problem faced by the various non-governmental organisations concerned with the conservation of the Rhino and Elephant populations in Southern Africa, of deciding how best to allocate their funds towards this purpose. General conclusions are drawn concerning the use of analytical techniques, particularly the AHP, in planning and decision making in Wildlife Management.

  2. Global patterns and trends in human-wildlife conflict compensation.

    Science.gov (United States)

    Ravenelle, Jeremy; Nyhus, Philip J

    2017-12-01

    Human-wildlife conflict is a major conservation challenge, and compensation for wildlife damage is a widely used economic tool to mitigate this conflict. The effectiveness of this management tool is widely debated. The relative importance of factors associated with compensation success is unclear, and little is known about global geographic or taxonomic differences in the application of compensation programs. We reviewed research on wildlife-damage compensation to determine geographic and taxonomic gaps, analyze patterns of positive and negative comments related to compensation, and assess the relative magnitude of global compensation payments. We analyzed 288 publications referencing wildlife compensation and identified 138 unique compensation programs. These publications reported US$222 million (adjusted for inflation) spent on compensation in 50 countries since 1980. Europeans published the most articles, and compensation funding was highest in Europe, where depredation by wolves and bears was the most frequently compensated damage. Authors of the publications we reviewed made twice as many negative comments as positive comments about compensation. Three-quarters of the negative comments related to program administration. Conversely, three-quarters of the positive comments related to program outcomes. The 3 most common suggestions to improve compensation programs included requiring claimants to employ damage-prevention practices, such as improving livestock husbandry or fencing of crops to receive compensation (n = 25, 15%); modifying ex post compensation schemes to some form of outcome-based performance payment (n = 21, 12%); and altering programs to make compensation payments more quickly (n = 14, 8%). We suggest that further understanding of the strengths and weaknesses of compensation as a conflict-mitigation tool will require more systematic evaluation of the factors driving these opinions and that differentiating process and outcomes and understanding

  3. Habitat Evaluation Procedures (HEP) Report : Rainwater Wildlife Area, 1998-2001 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2004-01-01

    vegetation species, allowance of normative processes such as fire occurrence, and facilitating development of natural stable stream channels and associated floodplains. Implementation of habitat enhancement and restoration activities could generate an additional 1,850 habitat units in 10 years. Baseline and estimated future habitat units total 7,035.3 for the Rainwater Wildlife Area. Habitat protection, enhancement and restoration will require long-term commitments from managers to increase probabilities of success and meet the goals and objectives of the Northwest Power Planning Council's Fish and Wildlife Mitigation Program. Longer-term benefits of protection and enhancement activities include increases in native species diversity and plant community resiliency in all cover types. Watershed conditions, including floodplain/riparian, and instream habitat quality should improve as well providing multiple benefits for terrestrial and aquatic resources. While such benefits are not necessarily recognized by HEP models and reflected in the number of habitat units generated, they are consistent with the NPPC Fish and Wildlife Program.

  4. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    Energy Technology Data Exchange (ETDEWEB)

    Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  5. Habitat Evaluation Procedures (HEP) Report; Precious Lands Wildlife Management Area, Technical Report 2000-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Kozusko, Shana

    2003-12-01

    The Nez Perce Tribe (NPT) currently manages a 15,325 acre parcel of land known as the Precious Lands Wildlife Management Area that was purchased as mitigation for losses incurred by construction of the four lower Snake River dams. The Management Area is located in northern Wallowa County, Oregon and southern Asotin County, Washington (Figure 1). It is divided into three management parcels--the Buford parcel is located on Buford Creek and straddles the WA-OR state line, and the Tamarack and Basin parcels are contiguous to each other and located between the Joseph Creek and Cottonwood Creek drainages in Wallowa County, OR. The project was developed under the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501), with funding from the Bonneville Power Administration (BPA). The acreage protected under this contract will be credited to BPA as habitat permanently dedicated to wildlife and wildlife mitigation. A modeling strategy known as Habitat Evaluation Procedure (HEP) was developed by the U.S. Fish and Wildlife Service and adopted by BPA as a habitat equivalency accounting system. Nine wildlife species models were used to evaluate distinct cover type features and provide a measure of habitat quality. Models measure a wide range of life requisite variables for each species and monitor overall trends in vegetation community health and diversity. One product of HEP is an evaluation of habitat quality expressed in Habitat Units (HUs). This HU accounting system is used to determine the amount of credit BPA receives for mitigation lands. After construction of the four lower Snake River dams, a HEP loss assessment was conducted to determine how many Habitat Units were inundated behind the dams. Twelve target species were used in that evaluation: Canada goose, mallard, river otter, downy woodpecker, song sparrow, yellow warbler, marsh wren, western meadowlark, chukar, ring-necked pheasant, California quail, and mule deer. The U.S. Army Corp of

  6. Assessing patterns of human-wildlife conflicts and compensation around a Central Indian protected area.

    Directory of Open Access Journals (Sweden)

    Krithi K Karanth

    Full Text Available Mitigating crop and livestock loss to wildlife and improving compensation distribution are important for conservation efforts in landscapes where people and wildlife co-occur outside protected areas. The lack of rigorously collected spatial data poses a challenge to management efforts to minimize loss and mitigate conflicts. We surveyed 735 households from 347 villages in a 5154 km(2 area surrounding Kanha Tiger Reserve in India. We modeled self-reported household crop and livestock loss as a function of agricultural, demographic and environmental factors, and mitigation measures. We also modeled self-reported compensation received by households as a function of demographic factors, conflict type, reporting to authorities, and wildlife species involved. Seventy-three percent of households reported crop loss and 33% livestock loss in the previous year, but less than 8% reported human injury or death. Crop loss was associated with greater number of cropping months per year and proximity to the park. Livestock loss was associated with grazing animals inside the park and proximity to the park. Among mitigation measures only use of protective physical structures were associated with reduced livestock loss. Compensation distribution was more likely for tiger related incidents, and households reporting loss and located in the buffer. Average estimated probability of crop loss was 0.93 and livestock loss was 0.60 for surveyed households. Estimated crop and livestock loss and compensation distribution were higher for households located inside the buffer. Our approach modeled conflict data to aid managers in identifying potential conflict hotspots, influential factors, and spatially maps risk probability of crop and livestock loss. This approach could help focus allocation of conservation efforts and funds directed at conflict prevention and mitigation where high densities of people and wildlife co-occur.

  7. Assessing patterns of human-wildlife conflicts and compensation around a Central Indian protected area.

    Science.gov (United States)

    Karanth, Krithi K; Gopalaswamy, Arjun M; DeFries, Ruth; Ballal, Natasha

    2012-01-01

    Mitigating crop and livestock loss to wildlife and improving compensation distribution are important for conservation efforts in landscapes where people and wildlife co-occur outside protected areas. The lack of rigorously collected spatial data poses a challenge to management efforts to minimize loss and mitigate conflicts. We surveyed 735 households from 347 villages in a 5154 km(2) area surrounding Kanha Tiger Reserve in India. We modeled self-reported household crop and livestock loss as a function of agricultural, demographic and environmental factors, and mitigation measures. We also modeled self-reported compensation received by households as a function of demographic factors, conflict type, reporting to authorities, and wildlife species involved. Seventy-three percent of households reported crop loss and 33% livestock loss in the previous year, but less than 8% reported human injury or death. Crop loss was associated with greater number of cropping months per year and proximity to the park. Livestock loss was associated with grazing animals inside the park and proximity to the park. Among mitigation measures only use of protective physical structures were associated with reduced livestock loss. Compensation distribution was more likely for tiger related incidents, and households reporting loss and located in the buffer. Average estimated probability of crop loss was 0.93 and livestock loss was 0.60 for surveyed households. Estimated crop and livestock loss and compensation distribution were higher for households located inside the buffer. Our approach modeled conflict data to aid managers in identifying potential conflict hotspots, influential factors, and spatially maps risk probability of crop and livestock loss. This approach could help focus allocation of conservation efforts and funds directed at conflict prevention and mitigation where high densities of people and wildlife co-occur.

  8. Coupling the biophysical and social dimensions of wildfire risk to improve wildfire mitigation planning

    Science.gov (United States)

    Alan A. Ager; Jeffrey D. Kline; A. Paige Fisher

    2015-01-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social...

  9. Visitor and community survey results for Prime Hook National Wildlife Refuge: Completion report

    Science.gov (United States)

    Sexton, Natalie R.; Stewart, Susan C.; Koontz, Lynne; Ponds, Phadrea; Walters, Katherine D.

    2007-01-01

    This study was commissioned by the Northeast Region of the U.S. Fish and Wildlife Service (USFWS) in support of the Comprehensive Conservation Planning at Prime Hook National Wildlife Refuge (Prime Hook NWR or Refuge). The National Wildlife Refuge Improvement Act of 1997 (Public Law 105-57, USC668dd) mandates a Comprehensive Conservation Plan (CCP) for every refuge in the system. A refuge CCP outlines goals, objectives, and management strategies for all refuge programs over the next 15 years, while providing opportunities for compatible, wildlifedependent public uses. The plan evaluates refuge wildlife, habitat, land protection, and visitor service priorities during the planning process.

  10. Northwest conservation and electric power plan 1986. Volume I

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This 20 year plan is prepared in accordance with the Pacific Northwest Electric Power Planning and Conservation Act - Public Law 96-501, of 1980. This Act required the Council to develop and adopt a 20-year electrical power plan for the region with a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The plan provides a 25 year history of the regions power development and comments on its unique features and changing nature. Presentations covers problems, solutions and the planning strategy for risk management. The existing electrical power system is discussed along with future electricity needs, generating resources, conservation of resources, regional needs and resources, and the 1986 action plan. Underlying details are provided in Volume II

  11. Monitoring habitat restoration projects: U.S. Fish and Wildlife Service Pacific Region Partners for Fish and Wildlife Program and Coastal Program Protocol

    Science.gov (United States)

    Woodward, Andrea; Hollar, Kathy

    2011-01-01

    The U.S. Fish and Wildlife Service's (FWS) Pacific Region (Region 1) includes more than 158 million acres (almost 247,000 square miles) of land base in Idaho, Oregon, Washington, Hawai`i, the Commonwealth of the Northern Mariana Islands, American Samoa, Guam, the Republic of Palau, the Federated States of Micronesia, and the Republic of the Marshall Islands. Region 1 is ecologically diverse with landscapes that range from coral reefs, broadleaf tropical forests, and tropical savannahs in the Pacific Islands, to glacial streams and lakes, lush old-growth rainforests, inland fjords, and coastal shoreline in the Pacific Northwest, to the forested mountains, shrub-steppe desert, and native grasslands in the Inland Northwest. Similarly, the people of the different landscapes perceive, value, and manage their natural resources in ways unique to their respective regions and cultures. The Partners for Fish and Wildlife Program (Partners Program) and Coastal Program work with a variety of partners in Region 1 including individual landowners, watershed councils, land trusts, Soil and Water Conservation Districts, non-governmental organizations, Tribal governments, Native Hawaiian organizations, and local, State, and Federal agencies. The Partners Program is the FWS's vanguard for working with private landowners to voluntarily restore and conserve fish and wildlife habitat. Using non-regulatory incentives, the Partners Program engages willing partners to conserve and protect valuable fish and wildlife habitat on their property and in their communities. This is accomplished by providing the funding support and technical and planning tools needed to make on-the-ground conservation affordable, feasible, and effective. The primary goals of the Pacific Region Partners Program are to: Promote citizen and community-based stewardship efforts for fish and wildlife conservation Contribute to the recovery of at-risk species, Protect the environmental integrity of the National Wildlife

  12. Linking plastic ingestion research with marine wildlife conservation.

    Science.gov (United States)

    Avery-Gomm, Stephanie; Borrelle, Stephanie B; Provencher, Jennifer F

    2018-05-16

    Plastic is an increasingly pervasive marine pollutant. Concomitantly, the number of studies documenting plastic ingestion in wildlife is accelerating. Many of these studies aim to provide a baseline against which future levels of plastic ingestion can be compared, and are motivated by an underlying interest in the conservation of their study species and ecosystems. Although this research has helped to raise the profile of plastic as a pollutant of emerging concern, there is a disconnect between research examining plastic pollution and wildlife conservation. We present ideas to further discussion about how plastic ingestion research could benefit wildlife conservation by prioritising studies that elucidates the significance of plastic pollution as a population-level threat, identifies vulnerable populations, and evaluates strategies for mitigating impacts. The benefit of plastic ingestion research to marine wildlife can be improved by establishing a clearer understanding of how discoveries will be integrated into conservation and policy actions. Copyright © 2018. Published by Elsevier B.V.

  13. Spatio-temporal patterns of attacks on human and economic losses from wildlife in Chitwan National Park, Nepal

    NARCIS (Netherlands)

    Lamichhaen, B.R.; Persoon, G.A.; Leirs, H.; Poudel, S.; Subedi, N.; Pokheral, C.P.; Bhattarai, S.; Thapalia, B.P.; Iongh, de H.H.

    2018-01-01

    Wildlife attacks on humans and economic losses often result in reduced support of local communities for wildlife conservation. Information on spatial and temporal patterns of such losses in the highly affected areas contribute in designing and implementing effective mitigation measures. We analyzed

  14. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  15. Socioeconomic monitoring and mitigation plan for the Salt Repository Project Site, Deaf Smith County, Texas: Revision 5: Draft

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of the Socioeconomic Monitoring and Mitigation Plan (SMMP) is to identify, in consultation with the affected States and Indian Tribes, potentially significant adverse socioeconomic impacts that could result from site characterization activities, to describe approaches that will be used to monitor any such identified impacts, and to describe procedures for mitigating them. Chapter 3 of the SMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construction the exploratory shafts and surface support facilities. The rationale for developing socioeconomic monitoring studies is presented in Chapter 4. Chapter 5 contains descriptions of the socioeconomic monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the SMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 8 refs., 20 figs., 4 tabs

  16. Wildlife response on the Alaska North Slope

    International Nuclear Information System (INIS)

    Costanzo, D.; McKenzie, B.

    1992-01-01

    Recognizing the need for a comprehensive plan to deal with potentially oiled wildlife on the Alaskan North Slope, a multifaceted wildlife protection strategy was developed and implemented during 1991. The strategy incorporated all aspects of wildlife response including protection of critical habitat, hazing, capture and stabilization, long term rehabilitation, and release. The primary wildlife response strategy emphasizes controlling of the release and spreading of spilled oil at the source to prevent or reduce contamination of potentially affected species and/or their habitat. A secondary response strategy concentrates on keeping potentially affected wildlife away from an oiled area through the use of deterrent techniques. Tertiary response involves the capture and treatment of oiled wildlife. Implementation of the strategy included the development of specialized training, the procurement of equipment, and the construction of a bird stabilization center. The result of this initiative is a comprehensive wildlife response capability on the Alaskan North Slope. 1 ref., 5 figs., 3 tabs

  17. Mitigating amphibian chytridiomycosis in nature

    Science.gov (United States)

    Garner, Trenton W. J.; Schmidt, Benedikt R.; Martel, An; Pasmans, Frank; Muths, Erin L.; Cunningham, Andrew A.; Weldon, Che; Fisher, Matthew C.; Bosch, Jaime

    2016-01-01

    Amphibians across the planet face the threat of population decline and extirpation caused by the disease chytridiomycosis. Despite consensus that the fungal pathogens responsible for the disease are conservation issues, strategies to mitigate their impacts in the natural world are, at best, nascent. Reducing risk associated with the movement of amphibians, non-amphibian vectors and other sources of infection remains the first line of defence and a primary objective when mitigating the threat of disease in wildlife. Amphibian-associated chytridiomycete fungi and chytridiomycosis are already widespread, though, and we therefore focus on discussing options for mitigating the threats once disease emergence has occurred in wild amphibian populations. All strategies have shortcomings that need to be overcome before implementation, including stronger efforts towards understanding and addressing ethical and legal considerations. Even if these issues can be dealt with, all currently available approaches, or those under discussion, are unlikely to yield the desired conservation outcome of disease mitigation. The decision process for establishing mitigation strategies requires integrated thinking that assesses disease mitigation options critically and embeds them within more comprehensive strategies for the conservation of amphibian populations, communities and ecosystems.

  18. Design of a wildlife avoidance planning system for autonomous harvesting operations

    DEFF Research Database (Denmark)

    Bochtis, Dionysis D.; Grøn Sørensen, Claus; Green, Ole

    2014-01-01

    Harvesting and mowing operations are among the main potential stressors affecting wildlife within agricultural landscapes, leading to large animal losses. A number of studies have been conducted on harvesting practices to address the problem of wildlife mortality, providing a number of management...... actions or field area coverage strategies. Nevertheless, these are general rules limited to simple-shaped fields, and which are not applicable to more complex operational situations. The objectives of the present study were to design a system capable of deriving a wildlife avoidance driving pattern...

  19. Multi-objective and multi-criteria optimization for power generation expansion planning with CO2 mitigation in Thailand

    Directory of Open Access Journals (Sweden)

    Kamphol Promjiraprawat

    2013-06-01

    Full Text Available In power generation expansion planning, electric utilities have encountered the major challenge of environmental awareness whilst being concerned with budgetary burdens. The approach for selecting generating technologies should depend on economic and environmental constraint as well as externalities. Thus, the multi-objective optimization becomes a more attractive approach. This paper presents a hybrid framework of multi-objective optimization and multi-criteria decision making to solve power generation expansion planning problems in Thailand. In this paper, CO2 emissions and external cost are modeled as a multi-objective optimization problem. Then the analytic hierarchy process is utilized to determine thecompromised solution. For carbon capture and storage technology, CO2 emissions can be mitigated by 74.7% from the least cost plan and leads to the reduction of the external cost of around 500 billion US dollars over the planning horizon. Results indicate that the proposed approach provides optimum cost-related CO2 mitigation plan as well as external cost.

  20. A digital model for planning water management at Benton Lake National Wildlife Refuge, west-central Montana

    Science.gov (United States)

    Nimick, David A.; McCarthy, Peter M.; Fields, Vanessa

    2011-01-01

    Benton Lake National Wildlife Refuge is an important area for waterfowl production and migratory stopover in west-central Montana. Eight wetland units covering about 5,600 acres are the essential features of the refuge. Water availability for the wetland units can be uncertain owing to the large natural variations in precipitation and runoff and the high cost of pumping supplemental water. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, has developed a digital model for planning water management. The model can simulate strategies for water transfers among the eight wetland units and account for variability in runoff and pumped water. This report describes this digital model, which uses a water-accounting spreadsheet to track inputs and outputs to each of the wetland units of Benton Lake National Wildlife Refuge. Inputs to the model include (1) monthly values for precipitation, pumped water, runoff, and evaporation; (2) water-level/capacity data for each wetland unit; and (3) the pan-evaporation coefficient. Outputs include monthly water volume and flooded surface area for each unit for as many as 5 consecutive years. The digital model was calibrated by comparing simulated and historical measured water volumes for specific test years.

  1. Spatio-temporal patterns of attacks on human and economic losses from wildlife in Chitwan National Park, Nepal.

    Science.gov (United States)

    Lamichhane, Babu Ram; Persoon, Gerard A; Leirs, Herwig; Poudel, Shashank; Subedi, Naresh; Pokheral, Chiranjibi Prasad; Bhattarai, Santosh; Thapaliya, Bishnu Prasad; de Iongh, Hans H

    2018-01-01

    Wildlife attacks on humans and economic losses often result in reduced support of local communities for wildlife conservation. Information on spatial and temporal patterns of such losses in the highly affected areas contribute in designing and implementing effective mitigation measures. We analyzed the loss of humans, livestock and property caused by wildlife during 1998 to 2016, using victim family's reports to Chitwan National Park authorities and Buffer Zone User Committees. A total of 4,014 incidents were recorded including attacks on humans, livestock depredation, property damage and crop raiding caused by 12 wildlife species. In total >400,000 US dollar was paid to the victim families as a relief over the whole period. Most of the attacks on humans were caused by rhino, sloth bear, tiger, elephant, wild boar and leopard. A significantly higher number of conflict incidents caused by rhino and elephant were observed during full moon periods. An increase in the wildlife population did not coincide with an equal rise in conflict incidents reported. Underprivileged ethnic communities were attacked by wildlife more frequently than expected. Number of attacks on humans by carnivores and herbivores did not differ significantly. An insignificant decreasing trend of wildlife attacks on humans and livestock was observed with significant variation over the years. Tiger and leopard caused >90% of livestock depredation. Tigers killed both large (cattle and buffalo) and medium sized (goat, sheep, pig) livestock but leopard mostly killed medium sized livestock. Most (87%) of the livestock killing during 2012-2016 occurred within the stall but close (conflict mitigation measures (electric and mesh wire fences) have contributed to keep the conflict incidents in control. Strengthening mitigation measures like construction of electric or mesh wire fences and predator-proof livestock corrals along with educating local communities about wildlife behavior and timely management of

  2. Draft comprehensive conservation plan and environmental impact statement-Rocky Mountain Arsenal National Wildlife Refuge

    Science.gov (United States)

    ,

    2015-01-01

    The Rocky Mountain Arsenal National Wildlife Refuge Complex, consisting of some of the newer properties in the National Wildlife Refuge System, is a work in progress. Offering unique assets to surrounding communities, these lands promise to become some of the premier urban wildlife refuges in the country. At the heart of the refuge complex is the Rocky Mountain Arsenal National Wildlife Refuge: 16,000 acres of shortgrass and mixed-grass prairie that is home to bison, bald eagles, migratory songbirds, prairie dogs, and much more—all within the Denver Metropolitan area.This comprehensive conservation plan will be the first in the country designed to begin implementing the Refuge System’s new Urban Refuge Initiative. To accomplish this, we analyzed a wide range of options on how best to support up to one million visitors per year without compromising our principal purposes to protect and preserve fish and wildlife and their habitats. We are fortunate to have inherited a great deal of infrastructure from the U.S. Army, but we are also constrained by the current condition and layout of these facilities. Some of this infrastructure may be acting as barriers to the public—a condition inconsistent with the purposes of the refuge. Accordingly, we have developed a goal to increase and improve suitable access to the refuge, develop sustainable transportation options, and provide more connections among the units of the refuge complex. This increased access will enable people from all walks of life to visit the refuge. The vision we have developed for the refuge complex calls for the restoration of the refuge’s historical habitats, and the reconnection of people with the natural lands of the refuge and of the region at large using a network consisting of multimodal trails, a far-reaching light-rail system, and the Denver International Airport. This refuge is well positioned to leverage and catalyze early investments to create world-class wildlife habitat and a

  3. Integrating Climate Change Adaptation and Mitigation with Urban planning for a Livable city in Tehran

    Directory of Open Access Journals (Sweden)

    Mojtaba Rafieian

    2015-09-01

    Full Text Available Climate change impacts are seen within growing numbers of cities in low- and middle-income countries, so there is growing interest in the adaptation and mitigation plans and programs put forward by city authorities. This paper aims to provide a better understanding of the constraints which cities face them in this subject by analyzing the case of Tehran. City has a commitment to decentralization, transparency, accountability and participation. There are some new programs and plansin urban planning which has evolved to include a broad vision of urban challenges and responses, a commitment to environmental sustainability and a strategic plan that has involved multiple stakeholders. This paper describes the principles for integrating climate change adaptation and mitigation with urban planning which can be useful for urban authorities. Then it analysesthe many measures implemented in Tehran over the last years, which provide a solid foundation for more systematically addressing adaptation. It also describes the significant challenges faced by the city’s administration, especially around funding, data and the challenge of responding to pressing and competing interests.Tehran city is still struggling to complete greenhouse gas inventories andit has, however, implemented several specific mitigation measures and tries continuously to place this issue on the government’s agenda.However, Tehran’s particular way of responding to current development challenges has put in place the flexibility, creativity and commitment needed for adaptation, regardless of whether this is made explicit or not. The results of this study reveal thatTehran’s policies have had continuity and consistency, despite being frequently revised over years, because each administration has built upon the progress of its predecessor. This is quite unusual; it is more common for there to be a revision of all that has been accomplished and for the need to point out the negative

  4. On-Farm Mitigation of Transmission of Tuberculosis from White-Tailed Deer to Cattle: Literature Review and Recommendations

    Directory of Open Access Journals (Sweden)

    W. David Walter

    2012-01-01

    Full Text Available The Animal Industry Division of the Michigan Department of Agriculture and Rural Development (MDARD has been challenged with assisting farmers with modifying farm practices to reduce potential for exposure to Mycobacterium bovis from wildlife to cattle. The MDARD recommendations for on-farm risk mitigation practices were developed from experiences in the US, UK and Ireland and a review of the scientific literature. The objectives of our study were to review the present state of knowledge on M. bovis excretion, transmission, and survival in the environment and the interactions of wildlife and cattle with the intention of determining if the current recommendations by MDARD on farm practices are adequate and to identify additional changes to farm practices that may help to mitigate the risk of transmission. This review will provide agencies with a comprehensive summary of the scientific literature on mitigation of disease transmission between wildlife and cattle and to identify lacunae in published research.

  5. Toward an integrative molecular approach to wildlife disease.

    Science.gov (United States)

    DeCandia, Alexandra L; Dobson, Andrew P; vonHoldt, Bridgett M

    2018-01-29

    Pathogens pose serious threats to human health, agricultural investment, and biodiversity conservation through the emergence of zoonoses, spillover to domestic livestock, and epizootic outbreaks. As such, wildlife managers are often tasked with mitigating the negative effects of disease. Yet, parasites form a major component of biodiversity that often persist. This is due to logistical challenges of implementing management strategies and to insufficient understanding of host-parasite dynamics. We advocate for an inclusive understanding of molecular diversity in driving parasite infection and variable host disease states in wildlife systems. More specifically, we examine the roles of genetic, epigenetic, and commensal microbial variation in disease pathogenesis. These include mechanisms underlying parasite virulence and host resistance and tolerance, and the development, regulation, and parasite subversion of immune pathways, among other processes. Case studies of devil facial tumor disease in Tasmanian devils (Sarcophilus harrisii) and chytridiomycosis in globally distributed amphibians exemplify the broad range of questions that can be addressed by examining different facets of molecular diversity. For particularly complex systems, integrative molecular analyses present a promising frontier that can provide critical insights necessary to elucidate disease dynamics operating across scales. These insights enable more accurate risk assessment, reconstruction of transmission pathways, discernment of optimal intervention strategies, and development of more effective and ecologically sound treatments that minimize damage to the host population and environment. Such measures are crucial when mitigating threats posed by wildlife disease to humans, domestic animals, and species of conservation concern. © 2018 Society for Conservation Biology.

  6. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  7. One Health, emerging infectious diseases and wildlife: two decades of progress?

    Science.gov (United States)

    Cunningham, Andrew A; Daszak, Peter; Wood, James L N

    2017-07-19

    Infectious diseases affect people, domestic animals and wildlife alike, with many pathogens being able to infect multiple species. Fifty years ago, following the wide-scale manufacture and use of antibiotics and vaccines, it seemed that the battle against infections was being won for the human population. Since then, however, and in addition to increasing antimicrobial resistance among bacterial pathogens, there has been an increase in the emergence of, mostly viral, zoonotic diseases from wildlife, sometimes causing fatal outbreaks of epidemic proportions. Concurrently, infectious disease has been identified as an increasing threat to wildlife conservation. A synthesis published in 2000 showed common anthropogenic drivers of disease threats to biodiversity and human health, including encroachment and destruction of wildlife habitat and the human-assisted spread of pathogens. Almost two decades later, the situation has not changed and, despite improved knowledge of the underlying causes, little has been done at the policy level to address these threats. For the sake of public health and wellbeing, human-kind needs to work better to conserve nature and preserve the ecosystem services, including disease regulation, that biodiversity provides while also understanding and mitigating activities which lead to disease emergence. We consider that holistic, One Health approaches to the management and mitigation of the risks of emerging infectious diseases have the greatest chance of success.This article is part of the themed issue 'One Health for a changing world: zoonoses, ecosystems and human well-being'. © 2017 The Authors.

  8. Exploring the effects of spatial autocorrelation when identifying key drivers of wildlife crop-raiding.

    Science.gov (United States)

    Songhurst, Anna; Coulson, Tim

    2014-03-01

    Few universal trends in spatial patterns of wildlife crop-raiding have been found. Variations in wildlife ecology and movements, and human spatial use have been identified as causes of this apparent unpredictability. However, varying spatial patterns of spatial autocorrelation (SA) in human-wildlife conflict (HWC) data could also contribute. We explicitly explore the effects of SA on wildlife crop-raiding data in order to facilitate the design of future HWC studies. We conducted a comparative survey of raided and nonraided fields to determine key drivers of crop-raiding. Data were subsampled at different spatial scales to select independent raiding data points. The model derived from all data was fitted to subsample data sets. Model parameters from these models were compared to determine the effect of SA. Most methods used to account for SA in data attempt to correct for the change in P-values; yet, by subsampling data at broader spatial scales, we identified changes in regression estimates. We consequently advocate reporting both model parameters across a range of spatial scales to help biological interpretation. Patterns of SA vary spatially in our crop-raiding data. Spatial distribution of fields should therefore be considered when choosing the spatial scale for analyses of HWC studies. Robust key drivers of elephant crop-raiding included raiding history of a field and distance of field to a main elephant pathway. Understanding spatial patterns and determining reliable socio-ecological drivers of wildlife crop-raiding is paramount for designing mitigation and land-use planning strategies to reduce HWC. Spatial patterns of HWC are complex, determined by multiple factors acting at more than one scale; therefore, studies need to be designed with an understanding of the effects of SA. Our methods are accessible to a variety of practitioners to assess the effects of SA, thereby improving the reliability of conservation management actions.

  9. Integrating climate change into northeast and midwest State Wildlife Action Plans

    Science.gov (United States)

    Staudinger, Michelle D.; Morelli, Toni Lyn; Bryan, Alexander

    2015-01-01

    The Department of Interior Northeast Climate Science Center (NE CSC) conducts research that responds to the regional natural resource management community’s needs to anticipate, monitor, and adapt to climate change. The NE CSC is supported by a consortium of partners that includes the University of Massachusetts Amherst, College of Menominee Nation, Columbia University, Marine Biological Laboratory, University of Minnesota, University of Missouri Columbia, and University of Wisconsin. The NE CSC also engages and collaborates with a diversity of other federal, state, academic, tribal, and non-governmental organizations (NGOs) to conduct collaborative, stakeholder-driven, and climate-focused work. The State Wildlife Action Plans (SWAPs) are revised every 10 years; states are currently working towards a target deadline of October 2015. SWAP coordinators have been challenged to incorporate climate change impacts and species responses into their current revisions. This synthesis is intended to inform the science going into Northeast and Midwest SWAPs across the 22 NE CSC states ranging from Maine to Virginia, and Minnesota and Missouri in the eastern United States. It is anticipated that this synthesis will help guide SWAP authors in writing specific sections, help revise and finalize existing sections, or be incorporated as an appendix or addendum. The purpose of this NE CSC-led cooperative report is to provide a synthesis of what is known and what is uncertain about climate change and its impacts across the NE CSC region, with a particular focus on the responses and vulnerabilities of Regional Species of Greatest Conservation Need (RSGCN) and the habitats they depend on. Another goal is to describe a range of climate change adaptation approaches, processes, tools, and potential partnerships that are available to State natural resource managers across the Northeast and Midwest regions of the United States. Through illustrative case studies submitted by the NE CSC and

  10. Considerations on comprehensive risk assessment and mitigation planning of volcanic ash-fall

    International Nuclear Information System (INIS)

    Toshida, Kiyoshi

    2010-01-01

    Volcanic ash-fall is inevitable hazard throughout Japan, and causes wide range of effects due to its physical and chemical properties. Nuclear power plants in Japan face the necessity to assess the risk from volcanic ash-fall. Risk assessment of the volcanic ash-fall should include engineering solution and mitigation planning as well as the ash-fall hazard. This report points out the characteristics for reducing the various effects of volcanic ash-fall as follows. Large-scale eruptions produce prominent volcanic ash-falls that can approach power plants at a great distance. Aftermath hazards of ash-fall events, such as remobilization of fine ash particles and generation of lahars, require further assessments. The kind and extent of damages becomes greater whenever ash is wet. Wet ash requires separate assessments in contrast to dry ash. The mitigation and recovery measures at power plants involve quick cleanup operations of volcanic ash. Those operations should be prepared through comprehensive risk assessment, and by cooperation with authorities, during pre-eruption repose period. The comprehensive assessment for volcanic ash-fall hazards, however, has yet to be conducted. Development of risk communication method may result in increased implementation mitigation planning. Numerical analysis of the ash-fall hazards provides quantitative data on particle motions that can be used in the risk assessment. In order to implement the quantitative assessment method, the verification on the effect of ambient air condition to the altitude of volcanic ash cloud is necessary. We need to develop a three-dimensional model of volcanic ash cloud, and calculate motions of ash clouds under multiple conditions of ambient air. (author)

  11. Mitigating Undesignated Trail Use: The Efficacy of Messaging and Direct Site Management Actions in an Urban-Proximate Open Space Context.

    Science.gov (United States)

    Schwartz, F; Taff, B D; Lawhon, B; VanderWoude, D

    2018-05-08

    The use and creation of undesignated recreational trails can lead to erosion, vegetation damage, unsafe trail conditions, and impacts to local wildlife. The mitigation of undesignated trail use is typically addressed indirectly through minimum-impact visitor education programs such as Leave No Trace, or directly through closures or sanctions. In this study, researchers collaborated with City of Boulder, Colorado Open Space and Mountain Parks (OSMP) staff to develop a quasi-experimental field study that examined the effectiveness of indirect (messaging) and direct (barriers) management approaches to mitigating undesignated trail use. The study applied a Theory of Planned Behavior framework, utilized Leave No Trace messaging, and employed a method to pair survey and direct observation data. A total of 2232 visitor parties were observed, and 147 surveys were collected. The combined direct (barrier) and indirect (messaging) intervention was the most effective at mitigating undesignated trail use. Implications for management and future research are discussed.

  12. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  13. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site's contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b)

  14. Fluor Daniel Hanford implementation plan for DOE Order 5480.28. Natural phenomena hazards mitigation

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1997-01-01

    Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well as for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford

  15. WHC natural phenomena hazards mitigation implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  16. WILDLIFE HEALTH AND PUBLIC TRUST RESPONSIBILITIES FOR WILDLIFE RESOURCES.

    Science.gov (United States)

    Decker, Daniel J; Schuler, Krysten; Forstchen, Ann B; Wild, Margaret A; Siemer, William F

    2016-10-01

    A significant development in wildlife management is the mounting concern of wildlife professionals and the public about wildlife health and diseases. Concurrently, the wildlife profession is reexamining implications of managing wildlife populations as a public trust and the concomitant obligation to ensure the quality (i.e., health) and sustainability of wildlife. It is an opportune time to emphasize the importance of wildlife health, specifically to advocate for comprehensive and consistent integration of wildlife health in wildlife management. We summarize application of public trust ideas in wildlife population management in the US. We argue that wildlife health is essential to fulfilling public trust administration responsibilities with respect to wildlife, due to the central responsibility of trustees for ensuring the well-being of wildlife species (i.e., the core resources of the trust). Because both health of wildlife and risk perceptions regarding threats posed by wildlife disease to humans and domestic animals are issues of growing concern, managing wildlife disease and risk communication vis-à-vis wildlife health is critical to wildlife trust administration. We conclude that wildlife health professionals play a critical role in protecting the wildlife trust and that current conditions provide opportunities for important contributions by wildlife health professionals in wildlife management.

  17. Strategies for successful mitigation of socioeconomic impacts

    International Nuclear Information System (INIS)

    Moore, R.C.

    1987-01-01

    The successful mitigation of socioeconomic impacts requires careful planning for project inception through project completion. Although mitigation of socioeconomic impacts imposes additional responsibilities on project sponsors, benefits derived through increased productivity of the work force can offset costs involved. Cost effective impact mitigation plans can be developed which are flexible to respond to changing circumstances and which focus on prevention of adverse effects. Mitigation plans must, by necessity, begin with proper project planning. Project location and the schedule for various construction activities can have significant effect on impacts. Particular attention should be given to labor requirements, contracting procedures and hiring practices. The effects of layoffs at project completion should also be considered. Accurate forecasts of revenues available to local governments are essential to the development of fair mitigation programs. Increased revenues created as a result of proposed projects should be the basis for mitigation planning. Housing and worker transportation issues should be considered jointly. Depending upon the proximity of a proposed site to different communities, impacts can be radically different given different housing and transportation plans. Housing requirements should be considered by type and location. Per diem and other allowances can be utilized to influence the housing choices made by workers

  18. Wildlife Linkages - San Joaquin Valley [ds417

    Data.gov (United States)

    California Natural Resource Agency — The California Departments of Fish and Game, Parks and Recreation, and Transportation (Caltrans) are collaborating to improve planning information for wildlife...

  19. Wildlife Corridors - San Joaquin Valley [ds423

    Data.gov (United States)

    California Natural Resource Agency — The California Departments of Fish and Game, Parks and Recreation, and Transportation (Caltrans) are collaborating to improve planning information for wildlife...

  20. ANALYZE THE IMPACT OF HABITAT PATCHES ON WILDLIFE ROAD-KILL

    Directory of Open Access Journals (Sweden)

    S. Seok

    2015-10-01

    Full Text Available The ecosystem fragmentation due to transportation infrastructure causes a road-kill phenomenon. When making policies for mitigating road-kill it is important to select target-species in order to enhance its efficiency. However, many wildlife crossing structures have been questioned regarding their effectiveness due to lack of considerations such as target-species selection, site selection, management, etc. The purpose of this study is to analyse the impact of habitat patches on wildlife road-kill and to suggest that spatial location of habitat patches should be considered as one of the important factors when making policies for mitigating road-kill. Habitat patches were presumed from habitat variables and a suitability index on target-species that was chosen by literature review. The road-kill hotspot was calculated using Getis-Ord Gi*. After that, we performed a correlation analysis between Gi Z-score and the distance from habitat patches to the roads. As a result, there is a low negative correlation between two variables and it increases the Gi Z-score if the habitat patches and the roads become closer.

  1. Analyze the Impact of Habitat Patches on Wildlife Road-Kill

    Science.gov (United States)

    Seok, S.; Lee, J.

    2015-10-01

    The ecosystem fragmentation due to transportation infrastructure causes a road-kill phenomenon. When making policies for mitigating road-kill it is important to select target-species in order to enhance its efficiency. However, many wildlife crossing structures have been questioned regarding their effectiveness due to lack of considerations such as target-species selection, site selection, management, etc. The purpose of this study is to analyse the impact of habitat patches on wildlife road-kill and to suggest that spatial location of habitat patches should be considered as one of the important factors when making policies for mitigating road-kill. Habitat patches were presumed from habitat variables and a suitability index on target-species that was chosen by literature review. The road-kill hotspot was calculated using Getis-Ord Gi*. After that, we performed a correlation analysis between Gi Z-score and the distance from habitat patches to the roads. As a result, there is a low negative correlation between two variables and it increases the Gi Z-score if the habitat patches and the roads become closer.

  2. Stakeholder Evaluation for Canaan Valley National Wildlife Refuge: Completion Report

    Science.gov (United States)

    Sexton, Natalie R.; Burkardt, Nina; Swann, Margaret Earlene; Stewart, Susan C.

    2009-01-01

    The National Wildlife Refuge System, managed by the U.S. Fish and Wildlife Service (FWS), is the largest system of public lands in the world dedicated to wildlife conservation. There are over 545 national wildlife refuges nationwide, encompassing 95 million acres. As part of the National Wildlife Refuge System Improvement Act of 1997, each refuge is developing 15-year comprehensive conservation plans (CCPs). Each CCP describes a vision and desired future condition for the refuge and outlines goals, objectives, and management strategies for each refuge's habitat and visitor service programs. The CCP process for Canaan Valley National Wildlife Refuge (Refuge) in Davis, West Virginia was initiated in 2006. This planning process provides a unique opportunity for public input and involvement. Public involvement is an important part of the CCP process. Participation by parties with a stake in the resource (stakeholders) has the potential to increase understanding and support and reduce conflicts. Additionally, meaningful public participation in a decision process may increase trust and provide satisfaction in terms of both process and outcome for management and the public. Public meetings are a common way to obtain input from community members, visitors, and potential visitors. An 'Issues Workbook' is another tool the FWS uses to obtain public input and participation early in the planning process. Sometimes, however, these traditional methods do not capture the full range of perspectives that exist. A stakeholder evaluation is a way to more fully understand community preferences and opinions related to key topics in refuge planning. It can also help refuge staff understand how changes in management affect individuals in terms of their preference for services and experiences. Secondarily, a process such as this can address 'social goals' such as fostering trust in regulating agencies and reducing conflict among stakeholders. As part of the CCP planning effort at Canaan

  3. Understanding the diversity of public interests in wildlife conservation.

    Science.gov (United States)

    Teel, Tara L; Manfredo, Michael J

    2010-02-01

    North American state wildlife agencies are increasingly faced with the challenge of effectively representing a diverse public. With increasing social conflict over wildlife issues, the future of wildlife conservation hinges on preparedness of the profession to respond to this challenge. In the interest of finding ways to improve response, 19 agencies in the western U.S. joined forces to initiate an investigation that would provide a better understanding of the diversity of wildlife-related interests in the region. Specific objectives, accomplished through use of a mail survey administered in 2004, were to categorize people on the basis of their value orientations toward wildlife and explore how different groups were distributed across states and to examine differences on sociodemographic characteristics and attitudes toward wildlife-related topics among groups. The focus was on two orientations: domination (view of wildlife that prioritizes human well-being over wildlife and treats wildlife in utilitarian terms); and mutualism (view of wildlife as capable of relationships of trust with humans and defined by a desire for companionship with wildlife). Four types of people were identified on the basis of these orientations. Types differed in their geographic distribution and wildlife-related attitudes and behaviors, revealing how value orientations can form the foundation for conflict on wildlife issues. Our characterizations of stakeholder groups offer a framework that can be applied over time and across geographic scales to improve conservation planning efforts and inform broader thinking about the social aspects of wildlife conservation.

  4. Mitigation measures for the La Grande 1 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1992-01-01

    Measures to mitigate environmental impacts of the La Grande 1 hydroelectric development are described. An overview is presented of the La Grande 1 project, its surrounding environment, and the principle environmental repercussions of the reservoir, hydrological changes between the dam and river mouth, construction activities and permanent and temporary structures, and presence of workers. Mitigation measures including compensation, corrective measures (deforestation, selective cutting, fish populations, wildlife populations, land rehabilitation, access roads, fisheries, and erosion control), protective measures, enhancement measures, and contract and employment opportunities for the Cree population are described. 10 refs., 2 figs

  5. 50 CFR 18.118 - What are the mitigation, monitoring, and reporting requirements?

    Science.gov (United States)

    2010-10-01

    ... reporting requirements? 18.118 Section 18.118 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE... avoid significant additive and synergistic effects from multiple oil and gas exploration activities on... conducted i.e., a plan of operation; (B) A food and waste management plan; (C) Personnel training materials...

  6. Wildlife values of North American ricelands

    Science.gov (United States)

    Eadie, J.M.; Elphick, C.S.; Reinecke, K.J.; Miller, M.R.; Manley, Scott W.

    2008-01-01

    Ricelands have become an indispensable component of waterbird habitat and a leading example of integrating agricultural and natural resource management in the Mississippi Alluvial Valley, Gulf Coast, and Central California. Residual rice, weed seeds, and invertebrates provide food for many avian species during fall and winter. In North America, considerable information exists on the use of ricefields by wintering waterbirds, the value of ricelands as breeding habitat for birds, and the effects of organic chemicals on birds that- feed in ricefields. Recent research has also examined the influence of field management practices, such as winter flooding and post-harvest straw manipulation, on the suitability of ricefields for wildlife. Whereas early studies focused on detrimental effects of wildlife on rice production (e.g., crop depredation), it has become apparent that waterbirds may benefit producers by enhancing straw decomposition, reducing weed and pest pressure, and providing additional income through hunting and wildlife viewing opportunities. A comprehensive evaluation of agronomic and environmental issues is needed to meet the challenges of producing food and sustaining wildlife in twenty-first-century rice lands. Changes in agricultural markets, pressures of increased urban development, conflicting needs for limited resources such as water, endangered species constraints, and concerns over water quality must be addressed in developing a sustainable, mutually beneficial partnership among the rice industry, wildlife, and environmental interests. Research is also needed to evaluate potential reductions in the wildlife carrying capacity of ricelands resulting from new harvest and field management techniques, crop conversion, or loss of rice acreage. Key uncertainties include: (1) changes in waste grain abundance and availability due to various harvest and post-harvest management practices; (2) evaluating food depletion by birds feeding in rice6elds and

  7. Oil spill response plan

    International Nuclear Information System (INIS)

    1999-08-01

    The plan outlined in this document specifies the actions that the Canadian Wildlife Service Atlantic Region is mandated to take in the event of an oil spill, or on discovering oiled migratory birds in terrestrial, fresh water, marine and inter-tidal habitats. In addition to describing the role and responsibilities of the Canadian Wildlife Service, the document also describes response plans of other agencies for dealing with all wildlife species affected by oil spills. Reporting paths, the lead agency concept, shared responsibilities with other Canadian Wildlife Service regional offices, provincial agencies, Heritage Canada, non-government wildlife response agencies, oil spill response organizations, and international organizations are outlined. An overview of the reporting and communications process is also provided

  8. Tilting at wildlife: reconsidering human-wildlife conflict

    OpenAIRE

    Redpath, Stephen Mark; Bhatia, Saloni; Young, Juliette

    2015-01-01

    Conflicts between people over wildlife are widespread and damaging to both the wildlife and people involved. Such issues are often termed human–wildlife conflicts. We argue that this term is misleading and may exacerbate the problems and hinder resolution. A review of 100 recent articles on human–wildlife conflicts reveals that 97 were between conservation and other human activities, particularly those associated with livelihoods. We suggest that we should distinguish between human–wildlife i...

  9. 75 FR 24741 - Endangered and Threatened Wildlife and Plants; Mexican Wolf (Canis lupus baileyi) Conservation...

    Science.gov (United States)

    2010-05-05

    ...] Endangered and Threatened Wildlife and Plants; Mexican Wolf (Canis lupus baileyi) Conservation Assessment... Mexico Ecological Services Field Office, 2105 Osuna NE, Albuquerque, NM 87113; by telephone at 505-761... guided by the 1982 Mexican Wolf Recovery Plan (U.S. Fish and Wildlife Service 1982) (recovery plan...

  10. Habitat Evaluation Procedures (HEP) Report; Big Island - The McKenzie River, Technical Report 1998-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Sieglitz, Greg

    2001-03-01

    The Big Island site is located in the McKenzie River flood plain, containing remnant habitats of what was once more common in this area. A diverse array of flora and fauna, representing significant wildlife habitats, is present on the site. Stands of undisturbed forested wetlands, along with riparian shrub habitats and numerous streams and ponds, support a diversity of wildlife species, including neotropical migratory songbirds, raptors, mammals, reptiles, and amphibians (including two State-listed Sensitive Critical species). The project is located in eastern Springfield, Oregon (Figure 1). The project area encompasses 187 acres under several ownerships in Section 27 of Township 17S, Range 2W. Despite some invasion of non-native species, the site contains large areas of relatively undisturbed wildlife habitat. Over several site visits, a variety of wildlife and signs of wildlife were observed, including an active great blue heron rookery, red-Legged frog egg masses, signs of beaver, and a bald eagle, Wildlife habitat values resulting from the purchase of this site will contribute toward the goal of mitigating for habitat lost as outlined in the Bonneville Power Administration's (BPA) Mitigation and Enhancement Plan for the Willamette River Basin. Under this Plan, mitigation goals and objectives were developed as a result of the loss of wildlife habitat due to the construction of Federal hydroelectric facilities in the Willamette River Basin. Results of the Habitat Evaluation Procedures (HEP) will be used to: (1) determine the current habitat status of the study area and habitat enhancement potential of the site consistent with wildlife mitigation goals and objectives; and (2) develop a management plan for the area.

  11. Threatened and Endangered Species Habitat Management Plan for Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hathcock, Charles Dean [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Keller, David Charles [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Thompson, Brent E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-16

    Los Alamos National Laboratory’s (LANL) Threatened and Endangered Species Habitat Management Plan (HMP) fulfills a commitment made to the U.S. Department of Energy (DOE) in the “Final Environmental Impact Statement for the Dual-Axis Radiographic Hydrodynamic Test Facility Mitigation Action Plan” (DOE 1996). The HMP received concurrence from the U.S. Fish and Wildlife Service (USFWS) in 1999 (USFWS consultation numbers 2-22-98-I-336 and 2-22-95-I-108). This 2017 update retains the management guidelines from the 1999 HMP for listed species, and updates some descriptive information.

  12. 75 FR 3753 - Tishomingo National Wildlife Refuge, Comprehensive Conservation Plan, Johnston County, OK

    Science.gov (United States)

    2010-01-22

    ..., consistent with sound principles of fish and wildlife management, conservation, legal mandates, and our... issues and relevant mandates; and is consistent with principles of sound fish and wildlife management... improved or expanded to accommodate more visitors. Current habitat management practices would continue...

  13. Blow flies as urban wildlife sensors.

    Science.gov (United States)

    Hoffmann, Constanze; Merkel, Kevin; Sachse, Andreas; Rodríguez, Pablo; Leendertz, Fabian H; Calvignac-Spencer, Sébastien

    2018-05-01

    Wildlife detection in urban areas is very challenging. Conventional monitoring techniques such as direct observation are faced with the limitation that urban wildlife is extremely elusive. It was recently shown that invertebrate-derived DNA (iDNA) can be used to assess wildlife diversity in tropical rainforests. Flies, which are ubiquitous and very abundant in most cities, may also be used to detect wildlife in urban areas. In urban ecosystems, however, overwhelming quantities of domestic mammal DNA could completely mask the presence of wild mammal DNA. To test whether urban wild mammals can be detected using fly iDNA, we performed DNA metabarcoding of pools of flies captured in Berlin, Germany, using three combinations of blocking primers. Our results show that domestic animal sequences are, as expected, very dominant in urban environments. Nevertheless, wild mammal sequences can often be retrieved, although they usually only represent a minor fraction of the sequence reads. Fly iDNA metabarcoding is therefore a viable approach for quick scans of urban wildlife diversity. Interestingly, our study also shows that blocking primers can interact with each other in ways that affect the outcome of metabarcoding. We conclude that the use of complex combinations of blocking primers, although potentially powerful, should be carefully planned when designing experiments. © 2018 John Wiley & Sons Ltd.

  14. The use of air bags for mitigating grade crossing and trespass accidents : literature review and research plan.

    Science.gov (United States)

    2016-06-01

    This literature review will confirm prior work in the use of locomotive airbag technologies for vehicle or pedestrian collision : mitigation, and to focus planned activities and tasks for this research. The state of the art in relevant technologies h...

  15. 77 FR 71011 - Dungeness National Wildlife Refuge, Clallam County, WA; Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-11-28

    ... that are closed to visitors year-round for the benefit of wildlife would remain the same. Public-use... observation, wildlife photography, hiking, boating (no wake allowed), jogging, horseback riding, beach use...

  16. Attitudes of Local People Toward Wildlife Conservation: A Case Study From the Kashmir Valley

    Directory of Open Access Journals (Sweden)

    Zaffar Rais Mir

    2015-11-01

    Full Text Available People’s attitudes toward wildlife conservation can significantly affect the success of conservation initiatives. Understanding the factors influencing these attitudes is essential for designing strategies to alleviate human–wildlife conflict. Although this topic has been studied extensively across diverse regions, there has been no such study in the Kashmir Division of Jammu and Kashmir state, India. We surveyed 3 administrative units around Dachigam National Park through semistructured interviews (n = 384 to investigate the socioeconomic status of local people, the extent of economic damage caused by wild animals, and people’s attitudes toward wildlife conservation. Results, analyzed using a generalized linear model approach, indicated that about 75% of the respondents suffered crop damage, while 23% suffered livestock predation by wild animals. The majority of respondents expressed favorable attitudes toward wildlife, with only about 16% expressing a negative perception. Gender, crop damage, livestock predation, and total livestock holdings were the strongest variables influencing the attitudes of local people in the study area. The study identified the need to use appropriate mitigation measures to minimize economic damage by wildlife in order to reduce negative local attitudes toward wildlife conservation.

  17. 77 FR 61426 - Rose Atoll National Wildlife Refuge, American Samoa; Draft Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-10-09

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-R-2012-N171; 1265-0000-10137-S3] Rose... Rose Atoll National Wildlife Refuge (NWR/refuge) for public review and comment. In the Draft CCP/EA, [email protected] . Include ``Rose Atoll National Wildlife Refuge Draft CCP/EA'' in the subject line of the...

  18. Human-Wildlife Conflicts in Nepal: Patterns of Human Fatalities and Injuries Caused by Large Mammals.

    Science.gov (United States)

    Acharya, Krishna Prasad; Paudel, Prakash Kumar; Neupane, Prem Raj; Köhl, Michael

    2016-01-01

    Injury and death from wildlife attacks often result in people feeling violent resentment and hostility against the wildlife involved and, therefore, may undermine public support for conservation. Although Nepal, with rich biodiversity, is doing well in its conservation efforts, human-wildlife conflicts have been a major challenge in recent years. The lack of detailed information on the spatial and temporal patterns of human-wildlife conflicts at the national level impedes the development of effective conflict mitigation plans. We examined patterns of human injury and death caused by large mammals using data from attack events and their spatiotemporal dimensions collected from a national survey of data available in Nepal over five years (2010-2014). Data were analyzed using logistic regression and chi-square or Fisher's exact tests. The results show that Asiatic elephants and common leopards are most commonly involved in attacks on people in terms of attack frequency and fatalities. Although one-horned rhinoceros and bears had a higher frequency of attacks than Bengal tigers, tigers caused more fatalities than each of these two species. Attacks by elephants peaked in winter and most frequently occurred outside protected areas in human settlements. Leopard attacks occurred almost entirely outside protected areas, and a significantly greater number of attacks occurred in human settlements. Attacks by one-horned rhinoceros and tigers were higher in the winter, mainly in forests inside protected areas; similarly, attacks by bears occurred mostly within protected areas. We found that human settlements are increasingly becoming conflict hotspots, with burgeoning incidents involving elephants and leopards. We conclude that species-specific conservation strategies are urgently needed, particularly for leopards and elephants. The implications of our findings for minimizing conflicts and conserving these imperiled species are discussed.

  19. Human-Wildlife Conflicts in Nepal: Patterns of Human Fatalities and Injuries Caused by Large Mammals

    Science.gov (United States)

    Acharya, Krishna Prasad; Paudel, Prakash Kumar; Neupane, Prem Raj; Köhl, Michael

    2016-01-01

    Injury and death from wildlife attacks often result in people feeling violent resentment and hostility against the wildlife involved and, therefore, may undermine public support for conservation. Although Nepal, with rich biodiversity, is doing well in its conservation efforts, human-wildlife conflicts have been a major challenge in recent years. The lack of detailed information on the spatial and temporal patterns of human-wildlife conflicts at the national level impedes the development of effective conflict mitigation plans. We examined patterns of human injury and death caused by large mammals using data from attack events and their spatiotemporal dimensions collected from a national survey of data available in Nepal over five years (2010–2014). Data were analyzed using logistic regression and chi-square or Fisher's exact tests. The results show that Asiatic elephants and common leopards are most commonly involved in attacks on people in terms of attack frequency and fatalities. Although one-horned rhinoceros and bears had a higher frequency of attacks than Bengal tigers, tigers caused more fatalities than each of these two species. Attacks by elephants peaked in winter and most frequently occurred outside protected areas in human settlements. Leopard attacks occurred almost entirely outside protected areas, and a significantly greater number of attacks occurred in human settlements. Attacks by one-horned rhinoceros and tigers were higher in the winter, mainly in forests inside protected areas; similarly, attacks by bears occurred mostly within protected areas. We found that human settlements are increasingly becoming conflict hotspots, with burgeoning incidents involving elephants and leopards. We conclude that species-specific conservation strategies are urgently needed, particularly for leopards and elephants. The implications of our findings for minimizing conflicts and conserving these imperiled species are discussed. PMID:27612174

  20. How Effective Is Road Mitigation at Reducing Road-Kill? A Meta-Analysis.

    Science.gov (United States)

    Rytwinski, Trina; Soanes, Kylie; Jaeger, Jochen A G; Fahrig, Lenore; Findlay, C Scott; Houlahan, Jeff; van der Ree, Rodney; van der Grift, Edgar A

    2016-01-01

    Road traffic kills hundreds of millions of animals every year, posing a critical threat to the populations of many species. To address this problem there are more than forty types of road mitigation measures available that aim to reduce wildlife mortality on roads (road-kill). For road planners, deciding on what mitigation method to use has been problematic because there is little good information about the relative effectiveness of these measures in reducing road-kill, and the costs of these measures vary greatly. We conducted a meta-analysis using data from 50 studies that quantified the relationship between road-kill and a mitigation measure designed to reduce road-kill. Overall, mitigation measures reduce road-kill by 40% compared to controls. Fences, with or without crossing structures, reduce road-kill by 54%. We found no detectable effect on road-kill of crossing structures without fencing. We found that comparatively expensive mitigation measures reduce large mammal road-kill much more than inexpensive measures. For example, the combination of fencing and crossing structures led to an 83% reduction in road-kill of large mammals, compared to a 57% reduction for animal detection systems, and only a 1% for wildlife reflectors. We suggest that inexpensive measures such as reflectors should not be used until and unless their effectiveness is tested using a high-quality experimental approach. Our meta-analysis also highlights the fact that there are insufficient data to answer many of the most pressing questions that road planners ask about the effectiveness of road mitigation measures, such as whether other less common mitigation measures (e.g., measures to reduce traffic volume and/or speed) reduce road mortality, or to what extent the attributes of crossing structures and fences influence their effectiveness. To improve evaluations of mitigation effectiveness, studies should incorporate data collection before the mitigation is applied, and we recommend a

  1. How Effective Is Road Mitigation at Reducing Road-Kill? A Meta-Analysis.

    Directory of Open Access Journals (Sweden)

    Trina Rytwinski

    Full Text Available Road traffic kills hundreds of millions of animals every year, posing a critical threat to the populations of many species. To address this problem there are more than forty types of road mitigation measures available that aim to reduce wildlife mortality on roads (road-kill. For road planners, deciding on what mitigation method to use has been problematic because there is little good information about the relative effectiveness of these measures in reducing road-kill, and the costs of these measures vary greatly. We conducted a meta-analysis using data from 50 studies that quantified the relationship between road-kill and a mitigation measure designed to reduce road-kill. Overall, mitigation measures reduce road-kill by 40% compared to controls. Fences, with or without crossing structures, reduce road-kill by 54%. We found no detectable effect on road-kill of crossing structures without fencing. We found that comparatively expensive mitigation measures reduce large mammal road-kill much more than inexpensive measures. For example, the combination of fencing and crossing structures led to an 83% reduction in road-kill of large mammals, compared to a 57% reduction for animal detection systems, and only a 1% for wildlife reflectors. We suggest that inexpensive measures such as reflectors should not be used until and unless their effectiveness is tested using a high-quality experimental approach. Our meta-analysis also highlights the fact that there are insufficient data to answer many of the most pressing questions that road planners ask about the effectiveness of road mitigation measures, such as whether other less common mitigation measures (e.g., measures to reduce traffic volume and/or speed reduce road mortality, or to what extent the attributes of crossing structures and fences influence their effectiveness. To improve evaluations of mitigation effectiveness, studies should incorporate data collection before the mitigation is applied, and we

  2. How Effective Is Road Mitigation at Reducing Road-Kill? A Meta-Analysis

    Science.gov (United States)

    Rytwinski, Trina; Soanes, Kylie; Jaeger, Jochen A. G.; Fahrig, Lenore; Findlay, C. Scott; Houlahan, Jeff; van der Ree, Rodney; van der Grift, Edgar A

    2016-01-01

    Road traffic kills hundreds of millions of animals every year, posing a critical threat to the populations of many species. To address this problem there are more than forty types of road mitigation measures available that aim to reduce wildlife mortality on roads (road-kill). For road planners, deciding on what mitigation method to use has been problematic because there is little good information about the relative effectiveness of these measures in reducing road-kill, and the costs of these measures vary greatly. We conducted a meta-analysis using data from 50 studies that quantified the relationship between road-kill and a mitigation measure designed to reduce road-kill. Overall, mitigation measures reduce road-kill by 40% compared to controls. Fences, with or without crossing structures, reduce road-kill by 54%. We found no detectable effect on road-kill of crossing structures without fencing. We found that comparatively expensive mitigation measures reduce large mammal road-kill much more than inexpensive measures. For example, the combination of fencing and crossing structures led to an 83% reduction in road-kill of large mammals, compared to a 57% reduction for animal detection systems, and only a 1% for wildlife reflectors. We suggest that inexpensive measures such as reflectors should not be used until and unless their effectiveness is tested using a high-quality experimental approach. Our meta-analysis also highlights the fact that there are insufficient data to answer many of the most pressing questions that road planners ask about the effectiveness of road mitigation measures, such as whether other less common mitigation measures (e.g., measures to reduce traffic volume and/or speed) reduce road mortality, or to what extent the attributes of crossing structures and fences influence their effectiveness. To improve evaluations of mitigation effectiveness, studies should incorporate data collection before the mitigation is applied, and we recommend a

  3. Bird response to future climate and forest management focused on mitigating climate change

    Science.gov (United States)

    Jaymi J. LeBrun; Jeffrey E. Schneiderman; Frank R. Thompson; William D. Dijak; Jacob S. Fraser; Hong S. He; Joshua J. Millspaugh

    2016-01-01

    Context. Global temperatures are projected to increase and affect forests and wildlife populations. Forest management can potentially mitigate climateinduced changes through promoting carbon sequestration, forest resilience, and facilitated change. Objectives. We modeled direct and indirect effects of climate change on avian...

  4. Prevention of oiled wildlife project (POW)

    International Nuclear Information System (INIS)

    Harvey, T.C.

    1998-01-01

    The establishment of a project to analyse the nature and extent of the problem of marine oil spills and their impact on the wildlife in coastal Newfoundland was described. Pelagic seabirds were identified as the marine wildlife most affected by oil released into the ocean. The Prevention of Oiled Wildlife (POW) project was initiated by the Canadian Coast Guard, the lead agency for oil spills of unknown origin. Details of the POW project were provided. It was shown that the project serves as an interdepartmental approach to: (1) identifying past occurrences, probable sources, causes, effects and possible releases of oil into the marine environment, (2) identifying remedial measures undertaken to date to curb the release of oil, and (3) establishing a plan of action through legislation, education, detection, prosecution or any other means, to eliminate the release of oil. 14 refs., 4 tabs., 5 figs

  5. How Effective Is Road Mitigation at Reducing Road-Kill? A Meta-Analysis

    OpenAIRE

    Rytwinski, Trina; Soanes, Kylie; Jaeger, Jochen A. G.; Fahrig, Lenore; Findlay, C. Scott; Houlahan, Jeff; van der Ree, Rodney; van der Grift, Edgar A

    2016-01-01

    Road traffic kills hundreds of millions of animals every year, posing a critical threat to the populations of many species. To address this problem there are more than forty types of road mitigation measures available that aim to reduce wildlife mortality on roads (road-kill). For road planners, deciding on what mitigation method to use has been problematic because there is little good information about the relative effectiveness of these measures in reducing road-kill, and the costs of these...

  6. Organic amendments for risk mitigation of organochlorine pesticide residues in old orchard soils

    International Nuclear Information System (INIS)

    Centofanti, Tiziana; McConnell, Laura L.; Chaney, Rufus L.; Beyer, W. Nelson; Andrade, Natasha A.; Hapeman, Cathleen J.; Torrents, Alba; Nguyen, Anh; Anderson, Marya O.; Novak, Jeffrey M.

    2016-01-01

    Performance of compost and biochar amendments for in situ risk mitigation of aged DDT, DDE and dieldrin residues in an old orchard soil was examined. The change in bioavailability of pesticide residues to Lumbricus terrestris L. relative to the unamended control soil was assessed using 4-L soil microcosms with and without plant cover in a 48-day experiment. The use of aged dairy manure compost and biosolids compost was found to be effective, especially in the planted treatments, at lowering the bioavailability factor (BAF) by 18–39%; however, BAF results for DDT in the unplanted soil treatments were unaffected or increased. The pine chip biochar utilized in this experiment was ineffective at lower the BAF of pesticides in the soil. The US EPA Soil Screening Level approach was used with our measured values. Addition of 10% of the aged dairy manure compost reduced the average hazard quotient values to below 1.0 for DDT + DDE and dieldrin. Results indicate this sustainable approach is appropriate to minimize risks to wildlife in areas of marginal organochlorine pesticide contamination. Application of this remediation approach has potential for use internationally in areas where historical pesticide contamination of soils remains a threat to wildlife populations. - Highlights: • Historical applications of organochlorine pesticides are a risk to local ecosystems. • Low cost and sustainable mitigation measures are needed to reduce risks. • Organic matter rich amendments were added to contaminated soil. • Earthworms microcosms were used to measure bioaccumulation factors. • Aged composts were most effective at mitigating risks to ecosystems. - Incorporation of aged dairy manure and biosolids compost amendments is an effective, low cost approach to mitigate risks to terrestrial wildlife from organochlorine pesticides in soils.

  7. 78 FR 62648 - Cat Island National Wildlife Refuge; West Feliciana Parish, Louisiana

    Science.gov (United States)

    2013-10-22

    ...-FF04R02000] Cat Island National Wildlife Refuge; West Feliciana Parish, Louisiana AGENCY: Fish and Wildlife... comprehensive conservation plan (CCP) and associated National Environmental Policy Act (NEPA) documents for Cat... our process for developing a CCP for Cat Island NWR, West Feliciana Parish, Louisiana. This notice...

  8. 75 FR 22618 - Eastern Neck National Wildlife Refuge, Kent County, MD

    Science.gov (United States)

    2010-04-29

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R5-R-2009-N202; BAC-4311-K9-S3] Eastern... the environmental assessment (EA) for Eastern Neck National Wildlife Refuge (NWR). In this final CCP.... Agency Web Site: Download a copy of the document(s) at http://www.fws.gov/northeast/planning/Eastern...

  9. Reproductive Impacts of Endocrine-Disrupting Chemicals on Wildlife Species: Implications for Conservation of Endangered Species.

    Science.gov (United States)

    Tubbs, Christopher W; McDonough, Caitlin E

    2018-02-15

    Wildlife have proven valuable to our understanding of the potential effects of endocrine-disrupting chemicals (EDCs) on human health by contributing considerably to our understanding of the mechanisms and consequences of EDC exposure. But the threats EDCs present to populations of wildlife species themselves are significant, particularly for endangered species whose existence is vulnerable to any reproductive perturbation. However, few studies address the threats EDCs pose to endangered species owing to challenges associated with their study. Here, we highlight those barriers and review the available literature concerning EDC effects on endangered species. Drawing from other investigations into nonthreatened wildlife species, we highlight opportunities for new approaches to advance our understanding and potentially mitigate the effects of EDCs on endangered species to enhance their fertility.

  10. Urban flood mitigation planning for Guwahati: A case of Bharalu basin.

    Science.gov (United States)

    Sarmah, Tanaya; Das, Sutapa

    2018-01-15

    Guwahati, the capital city of Assam and the gateway to the seven north-eastern Indian states, is located in the Brahmaputra valley-one of the most flood prone regions of the world. The city receives an average annual rainfall of 1688 mm and is highly vulnerable towards frequent urban floods because of uncontrolled dumping of solid waste and siltation have choked the natural water channels. This coupled with the absence of an integrated drainage network and rapid urbanisation causes floods in many parts of the city, after a quick downpour. Bharalu river is the main natural water channel of the city and Bharalu basin is the most vulnerable one. The present paper is an attempt to plan for urban flood mitigation, by designing an integrated drainage network for the Bharalu basin which includes the low-lying urbanized areas bordered by the Guwahati-Shillong Road, the Radha Gobindo Baruah Road and the Rajgarh Road. Data regarding land use, flood level, rainfall, urban pattern and vulnerability towards urban flood were collected from available literature, field survey to find highest water level for 11.4 km road stretch, expert opinion survey from 18 experts and feedback from 77 community elders who have been residing in the city since the 1980s. The Bharalu basin is divided into seven drainage blocks and storm run-off has been calculated based on the inputs. Seven different trapezoidal drainage sections were designed to form an integrated drainage network which is 'self-healing' to a certain extent. This can serve as a template for the other catchment basins and to design a drainage network for the entire Guwahati city, thereby reducing urban flood hazard to a significant extent. The study illustrates the necessity of an urban flood mitigation planning approach in sub-Himalayan urban settlements such as Guwahati. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. International consensus principles for ethical wildlife control.

    Science.gov (United States)

    Dubois, Sara; Fenwick, Nicole; Ryan, Erin A; Baker, Liv; Baker, Sandra E; Beausoleil, Ngaio J; Carter, Scott; Cartwright, Barbara; Costa, Federico; Draper, Chris; Griffin, John; Grogan, Adam; Howald, Gregg; Jones, Bidda; Littin, Kate E; Lombard, Amanda T; Mellor, David J; Ramp, Daniel; Schuppli, Catherine A; Fraser, David

    2017-08-01

    Human-wildlife conflicts are commonly addressed by excluding, relocating, or lethally controlling animals with the goal of preserving public health and safety, protecting property, or conserving other valued wildlife. However, declining wildlife populations, a lack of efficacy of control methods in achieving desired outcomes, and changes in how people value animals have triggered widespread acknowledgment of the need for ethical and evidence-based approaches to managing such conflicts. We explored international perspectives on and experiences with human-wildlife conflicts to develop principles for ethical wildlife control. A diverse panel of 20 experts convened at a 2-day workshop and developed the principles through a facilitated engagement process and discussion. They determined that efforts to control wildlife should begin wherever possible by altering the human practices that cause human-wildlife conflict and by developing a culture of coexistence; be justified by evidence that significant harms are being caused to people, property, livelihoods, ecosystems, and/or other animals; have measurable outcome-based objectives that are clear, achievable, monitored, and adaptive; predictably minimize animal welfare harms to the fewest number of animals; be informed by community values as well as scientific, technical, and practical information; be integrated into plans for systematic long-term management; and be based on the specifics of the situation rather than negative labels (pest, overabundant) applied to the target species. We recommend that these principles guide development of international, national, and local standards and control decisions and implementation. © 2017 The Authors. Conservation Biology published by Wiley Periodicals, Inc. on behalf of Society for Conservation Biology.

  12. The use of regional advance mitigation planning (RAMP) to integrate transportation infrastructure impacts with sustainability; a perspective from the USA

    International Nuclear Information System (INIS)

    Thorne, James H; Huber, Patrick R; O’Donoghue, Elizabeth; Santos, Maria J

    2014-01-01

    Globally, urban areas are expanding, and their regional, spatially cumulative, environmental impacts from transportation projects are not typically assessed. However, incorporation of a Regional Advance Mitigation Planning (RAMP) framework can promote more effective, ecologically sound, and less expensive environmental mitigation. As a demonstration of the first phase of the RAMP framework, we assessed environmental impacts from 181 planned transportation projects in the 19 368 km 2 San Francisco Bay Area. We found that 107 road and railroad projects will impact 2411–3490 ha of habitat supporting 30–43 threatened or endangered species. In addition, 1175 ha of impacts to agriculture and native vegetation are expected, as well as 125 crossings of waterways supporting anadromous fish species. The extent of these spatially cumulative impacts shows the need for a regional approach to associated environmental offsets. Many of the impacts were comprised of numerous small projects, where project-by-project mitigation would result in increased transaction costs, land costs, and lost project time. Ecological gains can be made if a regional approach is taken through the avoidance of small-sized reserves and the ability to target parcels for acquisition that fit within conservation planning designs. The methods are straightforward, and can be used in other metropolitan areas. (papers)

  13. Environmental and regulatory considerations when planning a geophysical program

    International Nuclear Information System (INIS)

    Down-Cicoria, C.

    1999-01-01

    Public concerns regarding the environmental impact of geophysical programs have resulted in more pressure on the federal and provincial governments to regulate and protect unique ecosites. In the past decade, about 1 million kilometres of seismic have been shot by the petroleum industry in Alberta alone, representing about 70,000 hectares of land base. This paper reviewed how a preliminary assessment of any geophysical project should consider the effects of all projects on the terrain, climate, vegetation, soils, fisheries, wildlife, aquatic ecosystems, heritage resources, and timber dispositions. Geo-administrative boundaries, field assessments, environmental assessments and mitigation measures such as low impact line cutting methods, timing methods, and heli-portable operations must also be considered. Special considerations when planning a three-dimensional program were highlighted. Certain equipment suitable as mitigation measures such as mulchers, hydro-axes, enviro-drills, biodegradable lathes, tracked/low PSI equipment, and doglegs were also reviewed. 15 refs., 2 tabs., 18 figs

  14. How effective is road mitigation at reducing road-kill? A meta-analysis

    NARCIS (Netherlands)

    Rytwinski, Trina; Soanes, Kylie; Jaeger, Jochen A.G.; Fahrig, Lenore; Findlay, C.S.; Houlahan, Jeff; Ree, van der Rodney; Grift, van der Edgar A.

    2016-01-01

    Road traffic kills hundreds of millions of animals every year, posing a critical threat to the populations of many species. To address this problem there are more than forty types of road mitigation measures available that aim to reduce wildlife mortality on roads (road-kill). For road planners,

  15. Determining Coastal Hazards Risk Perception to Enhance Local Mitigation Planning through a Participatory Mapping Approach

    Science.gov (United States)

    Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.

    2017-12-01

    Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit

  16. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    International Nuclear Information System (INIS)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability

  17. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.

  18. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    Science.gov (United States)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  19. Vulnerability to Urban Heat Island in São Paulo Municipality: An Approach to Support the Mitigation Measures Implementation in Urban Planning

    Directory of Open Access Journals (Sweden)

    Juliana Siqueira-Gay

    2017-10-01

    Full Text Available In the practice of urban and environmental planning, especially in the context of adaptation to environmental changes, there is a demand for studies that integrate social, economic and environmental information of the population and related risk. Particularly in large urban centers, waterproofing and verticalization have the potential to increase local air temperature, triggering the phenomenon of heat islands. Therefore, this phenomenon has side effects such as public health problems, pollution and changes in the air circulation. In view of the risks and consequences of the urban heat islands, this paper aims to analyze the priority areas for implementing measures to mitigate the effects of the urban heat islands phenomenon in São Paulo City (Brazil. A vulnerability index was proposed considering the social and environmental dimensions, relating the capacity of adaptation, sensitivity and exposure to the occurrence of the phenomenon of urban heat islands. Besides that, measures to mitigate the effects associated with heat islands in urban planning were identified. The central regions are critical for exposure and the outskirts, for adaptive capacity and sensitivity, both considered priorities for the implementation of mitigation measures. In addition, strategies such as implementation and conservation of green spaces, preservation of water bodies, urban design change, as well as use of materials with high reflectance are also listed and partially foreseen in the Municipal Strategic Master Plan to mitigate the effects of urban heat island.

  20. Integrated energy planning: Strategies to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz, Johnny N; Sheffield, John W [University of Missouri-Rolla (United States)

    1997-07-01

    The framework convention on climate change, signed by more than 150 governments worldwide in June 1992, calls on parties to the convention undertaken inventories of national sources and sinks of greenhouse gases and to develop plans for responding to climate change. The energy sector is comprised of the major energy demand sectors (industry, residential and commercial, transport and agriculture), and the energy supply sector, which consists of resource extraction, conversion, and delivery of energy products. Greenhouse Gas (GHG) emissions occur at various points in the sector, from resource extraction to end use application, and accordingly, options for mitigation exist at various points. In most countries, will be a major focus of GHG mitigation analysis. The primary focus of this paper is on the identification of strategies that can mitigate climate changes on the basis of integrated energy planing analysis. The overall approach follows a methodology developed by the U.S. Country Studies Program under the framework of the Convention's commitments. It involves the development of scenarios based on energy uses and evaluation of specific technologies that can satisfy demands for energy services. One can compare technologies based on their relative cost to achieve a unit of GHG reduction and other features of interest. This approach gives equal weight to both energy supply and energy demand options. A variety of screening criteria including indicators of cost-effectiveness as well as non-economic analysis concerns, can be used to identify and assess promising options, which can then be combined to create one or more scenarios. Mitigation scenarios are evaluated against the backdrop of a baseline scenario, which simulates assumed to take place in the absence of mitigation efforts. Mitigation scenarios can be designed to meet specific emission reduction targets or to simulate the effect of specific policy inventions. The paper ends with an application using a

  1. Wildlife resource trends in the United States: A technical document supporting the 2000 RPA Assessment

    Science.gov (United States)

    Curtis H. Flather; Stephen J. Brady; Michael S. Knowles

    1999-01-01

    This report documents trends in wildlife resources for the nation as required by the Renewable Resources Planning Act (RPA) of 1974. The report focuses on recent historical trends in wildlife as one indicator of ecosystem health across the United States and updates wildlife trends presented in previous RPA Assessments. The report also shows short- and long-term...

  2. Ecology of Problem Individuals and the Efficacy of Selective Wildlife Management.

    Science.gov (United States)

    Swan, George J F; Redpath, Steve M; Bearhop, Stuart; McDonald, Robbie A

    2017-07-01

    As a result of ecological and social drivers, the management of problems caused by wildlife is becoming more selective, often targeting specific animals. Narrowing the sights of management relies upon the ecology of certain 'problem individuals' and their disproportionate contribution to impacts upon human interests. We assess the ecological evidence for problem individuals and confirm that some individuals or classes can be both disproportionately responsible and more likely to reoffend. The benefits of management can sometimes be short-lived, and selective management can affect tolerance of wildlife for better or worse, but, when effectively targeted, selective management can bring benefits by mitigating impact and conflict, often in a more socially acceptable way. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control Systemm (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1994-08-01

    The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable

  4. 75 FR 13125 - Pet Spot-On Analysis and Mitigation Plan Available for Public Comment; Notice of Availability

    Science.gov (United States)

    2010-03-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0229; FRL-8816-8] Pet Spot-On Analysis and... registered pet spot-on products to control fleas and ticks and a mitigation plan. The analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products. The Agency is requesting...

  5. 77 FR 27245 - Big Stone National Wildlife Refuge, Big Stone and Lac Qui Parle Counties, MN

    Science.gov (United States)

    2012-05-09

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-R-2012-N069; FXRS1265030000S3-123-FF03R06000] Big Stone National Wildlife Refuge, Big Stone and Lac Qui Parle Counties, MN AGENCY: Fish and... plan (CCP) and environmental assessment (EA) for Big Stone National Wildlife Refuge (Refuge, NWR) for...

  6. Planning ahead for asteroid and comet hazard mitigation, phase 1: parameter space exploration and scenario modeling

    Energy Technology Data Exchange (ETDEWEB)

    Plesko, Catherine S [Los Alamos National Laboratory; Clement, R Ryan [Los Alamos National Laboratory; Weaver, Robert P [Los Alamos National Laboratory; Bradley, Paul A [Los Alamos National Laboratory; Huebner, Walter F [Los Alamos National Laboratory

    2009-01-01

    The mitigation of impact hazards resulting from Earth-approaching asteroids and comets has received much attention in the popular press. However, many questions remain about the near-term and long-term, feasibility and appropriate application of all proposed methods. Recent and ongoing ground- and space-based observations of small solar-system body composition and dynamics have revolutionized our understanding of these bodies (e.g., Ryan (2000), Fujiwara et al. (2006), and Jedicke et al. (2006)). Ongoing increases in computing power and algorithm sophistication make it possible to calculate the response of these inhomogeneous objects to proposed mitigation techniques. Here we present the first phase of a comprehensive hazard mitigation planning effort undertaken by Southwest Research Institute and Los Alamos National Laboratory. We begin by reviewing the parameter space of the object's physical and chemical composition and trajectory. We then use the radiation hydrocode RAGE (Gittings et al. 2008), Monte Carlo N-Particle (MCNP) radiation transport (see Clement et al., this conference), and N-body dynamics codes to explore the effects these variations in object properties have on the coupling of energy into the object from a variety of mitigation techniques, including deflection and disruption by nuclear and conventional munitions, and a kinetic impactor.

  7. Wildlife habitats in managed rangelands—the Great Basin of southeastern Oregon: introduction.

    Science.gov (United States)

    Chris Maser; Jack Ward. Thomas

    1983-01-01

    The need for a way by which rangeland managers can account for wildlife in land-use planning, in on-the-ground management actions, and in preparation of environmental impact statements is discussed. Principles of range-land-wildlife interactions and management are described along with management systems. The Great Basin of southeastern Oregon was selected as a well-...

  8. 75 FR 27576 - J.N. “Ding” Darling National Wildlife Refuge, Lee County, FL

    Science.gov (United States)

    2010-05-17

    ... wildlife and habitat diversity and the minimization of human impacts on these resources. In general... and lack of a comprehensive habitat management plan; and (8) insufficient resources to address refuge... (Native Wildlife and Habitat Diversity) Alternative B would expand or initiate our management activities...

  9. Disaster mitigation: initial response.

    Science.gov (United States)

    Kennedy, George; Richards, Michael; Chicarelli, Michael; Ernst, Amy; Harrell, Andrew; Stites, Danniel

    2013-01-01

    The objective of this review is to stimulate the reader's considerations for developing community disaster mitigation. Disaster mitigation begins long before impact and is defined as the actions taken by a community to eliminate or minimize the impact of a disaster. The assessment of vulnerabilities, the development of infrastructure, memoranda of understanding, and planning for a sustainable response and recovery are parts of the process. Empowering leadership and citizens with knowledge of available resources through the planning and development of a disaster response can strengthen a community's resilience, which can only add to the viability and quality of life enjoyed by the entire community.

  10. Effectiveness of Wildlife Underpasses and Fencing to Reduce Wildlife–Vehicle Collisions

    Science.gov (United States)

    ,; McCollister, Matthew F.

    2010-01-01

    Transportation planners are increasingly incorporating roadway design features to mitigate impacts of highways on wildlife and to increase driver safety. We used camera and track surveys to evaluate wildlife use before and after construction of 3 wildlife underpasses and associated fencing on a new section of United States Highway 64 in Washington County, North Carolina, USA. We recorded 242 occasions of white-tailed deer (Odocoileus virginianus) use of underpass areas before highway construction began. Following completion of the highway, we collected 2,433 photographs of 9 species with deer representing 93% of all crossings. Adjusting for differences in number of monitoring days, white-tailed deer use of underpass areas averaged 6.7 times greater after the new highway and underpasses were completed. We recorded 3,614 wildlife crossings of ≥20 species based on track counts, representing most medium and large mammals known to occur in the area and several reptiles and birds. After completion of the highway, we documented wildlife mortality due to vehicle collisions during a 13-month period and recorded 128 incidences representing ≥24 species. Within fenced highway segments, mortalities were lowest near underpasses and increased with distance from the underpasses. However, we also documented more mortalities in fenced areas compared with unfenced areas. With greater distance from an underpass, animals with smaller home ranges seemed less likely to reach the underpass and instead attempted to climb over or crawl under fencing. Based on collision reports from adjacent highway sections, the new section of United States Highway 64 experienced approximately 58% fewer wildlife mortalities (primarily white-tailed deer), suggesting underpasses and fencing reduced the number of deer–vehicle collisions. Continuous fencing between underpasses may further reduce the number of vehicle collisions for deer but additional design features (e.g., buried fencing) should be

  11. Intrusion of devil weed Chromolaena odorata, an exotic invasive, into Kinnerasani and Eturnagaram wildlife sanctuaries, Telangana, India

    Directory of Open Access Journals (Sweden)

    Sateesh Suthari

    2016-02-01

    Full Text Available The spread of devil weed is alarming in areas of podu cultivation, on the bunds of agricultural lands, wastelands, along roadsides, tracks, forest gaps, protected areas and plantations in the two said wildlife sanctuaries. It is found invading new territories easily along the river banks and steadily destroying the riparian elements. The manual removal of this weed (mechanical method before flowering is the effective means to mitigate the spread of the species in comparison to the biological (Pareuchaetes pseudoinsulata, P. insulata, Actinote thalia-pyrrha and chemical (Glyphosate, Triclopyrester methods attempted. It is not trouble in its native habitat but is weedy in India for want of natural enemies to keep it under control. It is a mandate to prevent the loss of native biodiversity due to biological invasions. Conversely, there is an urgent need to devise action plans by managers of the respective wildlife sanctuaries to control and eradicate it. The local people are to be educated of its potential dangers to their farming on one hand and NTFP extraction from the local forests on the other. The Government of India has to develop a national level policy towards the control of invasive alien weeds in general and implement it at the earliest before we loose our indigenous biodiversity once for all.

  12. 50 CFR 81.14 - Comprehensive plan alternative.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Comprehensive plan alternative. 81.14 Section 81.14 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR... alternative. In the event that the State elects to operate under a comprehensive fish and wildlife resource...

  13. Wildlife Communication

    DEFF Research Database (Denmark)

    Steen, Kim Arild; Therkildsen, Ole Roland; Karstoft, Henrik

    This report contains a progress report for the ph.d. project titled “Wildlife Communication”. The project focuses on investigating how signal processing and pattern recognition can be used to improve wildlife management in agriculture. Wildlife management systems used today experience habituation...

  14. From forest to farm: systematic review of cultivar feeding by chimpanzees--management implications for wildlife in anthropogenic landscapes.

    Science.gov (United States)

    Hockings, Kimberley J; McLennan, Matthew R

    2012-01-01

    Crop-raiding is a major source of conflict between people and wildlife globally, impacting local livelihoods and impeding conservation. Conflict mitigation strategies that target problematic wildlife behaviours such as crop-raiding are notoriously difficult to develop for large-bodied, cognitively complex species. Many crop-raiders are generalist feeders. In more ecologically specialised species crop-type selection is not random and evidence-based management requires a good understanding of species' ecology and crop feeding habits. Comprehensive species-wide studies of crop consumption by endangered wildlife are lacking but are important for managing human-wildlife conflict. We conducted a comprehensive literature search of crop feeding records by wild chimpanzees (Pan troglodytes), a ripe-fruit specialist. We assessed quantitatively patterns of crop selection in relation to species-specific feeding behaviour, agricultural exposure, and crop availability. Crop consumption by chimpanzees is widespread in tropical Africa. Chimpanzees were recorded to eat a considerable range of cultivars (51 plant parts from 36 species). Crop part selection reflected a species-typical preference for fruit. Crops widely distributed in chimpanzee range countries were eaten at more sites than sparsely distributed crops. We identified 'high' and 'low' conflict crops according to their attractiveness to chimpanzees, taking account of their importance as cash crops and/or staple foods to people. Most (86%) high conflict crops were fruits, compared to 13% of low conflict crops. Some widely farmed cash or staple crops were seldom or never eaten by chimpanzees. Information about which crops are most frequently consumed and which are ignored has enormous potential for aiding on-the-ground stakeholders (i.e. farmers, wildlife managers, and conservation and agricultural extension practitioners) develop sustainable wildlife management schemes for ecologically specialised and protected species in

  15. 76 FR 30959 - Bogue Chitto National Wildlife Refuge, LA and MS; Draft Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-05-27

    ... would strive to achieve a balanced program of wildlife-dependent recreational activities and protection... the majority of staff time and funds supporting a public use program, wildlife-dependent recreation...

  16. Urban Planning and Climate Change: Adaptation and Mitigation Strategies

    Directory of Open Access Journals (Sweden)

    Fulvia Pinto

    2014-05-01

    Full Text Available Climate change is a current phenomenon: the temperatures rise, rainfall patterns are changing, glaciers melt and the average global sea level is rising. It is expected that these changes will continue and that the extreme weather events, such as floods and droughts, will become more frequent and intense. The impact and vulnerability factors for nature, for the economy and for our health are different, depending on the territorial, social and economic aspects. The current scientific debate is focused on the need to formulate effective policies for adaptation and mitigation to climate change. The city plays an important role in this issue: it emits the most greenhouse gas emissions (more than 60% of the world population currently lives in urban areas and the city is more exposed and vulnerable to the impacts of climate change. Urban planning and territorial governance play a crucial role in this context: the international debate on the sustainability of urban areas is increasing. It’s necessary to adapt the tools of building regulations to increase the quality of energy - environment of the cities.

  17. Wildlife management using the AHP

    OpenAIRE

    L.P. Fatti

    2003-01-01

    Two applications of Saaty's Analytic Hierarchy Process towards solving decision problems in Wildlife Management are discussed. The first involves structuring the management objectives of a National Park and establishing priorities for the implementation of various possible strategic management plans in the Park. The second deals with the problem faced by the various non-governmental organisations concerned with the conservation of the Rhino and Elephant populations in Southern Africa, of deci...

  18. 77 FR 16556 - Kootenai National Wildlife Refuge, Boundary County, ID; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-03-21

    ...: Dianna Ellis, Refuge Manager, Kootenai National Wildlife Refuge, 287 Westside Road, Bonners Ferry, ID..., wildlife observation and photography, and environmental education and interpretation. We will review and... safety. Allowing big game and upland game (grouse) hunting on the 295 acres of timber on the west side of...

  19. Mercury mitigative measures related to hydroelectric reservoirs. The La Grande Complex experience

    International Nuclear Information System (INIS)

    Sbeghen, J.; Schetagne, R.

    1995-01-01

    Quebec Hydro's plan for mitigation of mercury contamination in fish and wildlife in the La Grande river basin was presented. The hazard and environmental threat posed by mercury contamination through flooding was described. Implications of mercury contamination for the Cree natives was discussed and provisions of the James Bay mercury agreement were described. Potential 'at source' remedial measures were described, including soil and vegetation removal, controlled burning of soils and vegetation, capping of flooded soils, lime or sulphite salt addition, sediment suspension, genetic manipulation of bacterial populations, selenium addition, nutrient addition, intensive fishing, and reservoir draining. Compensation measures were considered since no practical medium term remedial measures could be found. A case study of the Eastmain-1 Reservoir's $213 000 000 deforestation program was cited as a possible model. It was concluded that realistically, compensation produced the only feasible health risk reduction program, since none of the 'at source' remedial measure were technically or economically feasible. 24 refs

  20. Development of a digital land cover data base for the Selawik National Wildlife Refuge

    Science.gov (United States)

    Markon, Carl J.; Kirk, William

    1994-01-01

    Digital land cover and terrain data of the Selawik National Wildlife Refuge were produced by the U.S. Geological Survey's (USGS) Earth Resources Observation Systems Alaska Field Office for the U.S. Fish and Wildlife Service. These and other environmental data were incorporated into a Fish and Wildlife Service geographic information system to prepare a comprehensive conservation plan and an environmental impact statement for the refuge and to assist in research and management of the refuge.

  1. Wildlife Habitat Evaluation Handbook.

    Science.gov (United States)

    Neilson, Edward L., Jr.; Benson, Delwin E.

    The National 4-H Wildlife Invitational is a competitive event to teach youth about the fundamentals of wildlife management. Youth learn that management for wildlife means management of wildlife habitat and providing for the needs of wildlife. This handbook provides information about wildlife habitat management concepts in both urban and rural…

  2. 76 FR 582 - Elizabeth Hartwell Mason Neck National Wildlife Refuge, Fairfax County, VA, and Featherstone...

    Science.gov (United States)

    2011-01-05

    ...] Elizabeth Hartwell Mason Neck National Wildlife Refuge, Fairfax County, VA, and Featherstone National... comprehensive conservation plan and the environmental assessment (CCP/EA) for Elizabeth Hartwell Mason Neck (Mason Neck) National Wildlife Refuge (NWR) and Featherstone NWR for a 45-day public review and comment...

  3. 76 FR 48877 - Kootenai National Wildlife Refuge, Boundary County, ID; Draft Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-08-09

    ..., Kootenai National Wildlife Refuge, 287 Westside Road, Bonners Ferry, ID 83805. Web site: http://www.fws.gov..., wildlife observation and photography, and environmental education and interpretation. We will review and... the auto tour route to provide for safety. Big game and upland game (grouse) hunting would be allowed...

  4. Radon mitigation in private dwellings. Summary of measures under the National Action Plan against Cancer in Norway 1999-2003

    International Nuclear Information System (INIS)

    Aanestad, K.; Strand, T.; Hoegmo, T.; Skjennem, M.; Jensen, C. L.; Hoelsbrekken, S.

    2006-01-01

    The report summarizes the remedial measurements carried out under the National Action Plan against Cancer in Norway in the period 1999-2003.The cost effectiveness of the state subsidized remedial measures against radon is evaluated. Other measurements under the National Action Plan against Cancer have also been evaluated, such as measurements of radon in 38.000 dwellings in 158 municipalities, information measures, and actions to increase radon mitigation competence in the building construction industry and in the municipalities. (Author)

  5. Wildlife underpasses on U.S. 64 in North Carolina: integrating management and science objectives

    Science.gov (United States)

    Jones, Mark D.; Van Manen, Frank T.; Wilson, Travis W.; Cox, David R.

    2010-01-01

    This chapter on wildlife underpasses on U.S. Highway 64 in North Carolina is from a book on highways, wildlife, and habitat connectivity. U.S. 64 is an important route in North Carolina connecting major population centers and highways that underwent a major upgrade from a two-lane rural road to a major highway. New routes were proposed for a large portion of the project (28 miles) to improve driver safety and increase speed limits to 70 miles per hour (from the previously posted 55 mph). The authors review the geographical, historical, political, and social setting; the roadway and environmental issues; the rationale for the project; critical factors; outcomes of the project; and lessons learned. The area of the project supports high wildlife densities, including American black bears, white-tailed deer, red wolves, and bobcats. Critical factors to be incorporated into wildlife mitigation measures: driver safety, underpass construction costs, and permitting by the U.S. Fish and Wildlife Service and the U.S. Army Corps of Engineers. The U.S. 64 underpasses, completed in 2005, were the first in North Carolina designed specifically for wildlife and according to specifications provided by the North Carolina Wildlife Resources Commission (NCWRC). The authors describe the underpass specifications recommended based on this project, including size, control of public access, fencing, gates, and maintenance (notably vegetation management). The authors conclude that one of the most beneficial outcomes of this project was the fact that, since the completion of the U.S. 64 underpasses, the North Carolina Department of Transportation (NCDOT) routinely considers wildlife passageways for road projects in the state.

  6. Capacity building efforts and perceptions for wildlife surveillance to detect zoonotic pathogens: comparing stakeholder perspectives.

    Science.gov (United States)

    Schwind, Jessica S; Goldstein, Tracey; Thomas, Kate; Mazet, Jonna A K; Smith, Woutrina A

    2014-07-04

    Health approach to capacity building applied at local and global scales will have the greatest impact on improving zoonotic pathogen surveillance in wildlife. This approach will involve increasing communication and cooperation across ministries and sectors so that experts and stakeholders work together to identify and mitigate surveillance gaps. Over time, this transdisciplinary approach to capacity building will help overcome existing challenges and promote efficient targeting of high risk interfaces for zoonotic pathogen transmission.

  7. Conservation plan for protected species on Naval Petroleum Reserve No. 1, Kern County, California

    Energy Technology Data Exchange (ETDEWEB)

    Otten, M.R.M.; Cypher, B.L.

    1997-07-01

    Habitats in and around Naval Petroleum Reserve No. 1 (NPR-1) support populations of various vertebrates and plants, including a number of threatened and endangered species. Adequate conservation of habitats and species, particularly protected species, can be facilitated through development and implementation of management plans. This document provides a comprehensive plan for the conservation of protected species on NPR-1, through compliance with terms and conditions expressed in Biological Opinions rendered by the U.S. Fish and Wildlife Service for NPR-1 activities. Six conservation strategies by which threatened and endangered species have been, and will be, protected are described: population monitoring, mitigation strategies, special studies, operating guidelines and policies, information transfer and outreach, and the endangered species conservation area. Population monitoring programs are essential for determining population densities and for assessing the effects of oil field developments and environmental factors on protected species. Mitigation strategies (preactivity surveys and habitat reclamation) are employed to minimize the loss of important habitats components and to restore previously disturbed lands to conditions more suitable for species` use. A number of special studies were undertaken between 1985 and 1995 to investigate the effectiveness of a variety of population and habitat management techniques with the goal of increasing the density of protected species. Operating guidelines and policies governing routine oil field activities continue to be implemented to minimize the potential for the incidental take of protected species and minimize damage to wildlife habitats. Information transfer and outreach activities are important means by which technical and nontechnical information concerning protected species conservation on NPR-1 is shared with both the scientific and non-scientific public.

  8. A multi-period optimization model for planning of China's power sector with consideration of carbon dioxide mitigation—The importance of continuous and stable carbon mitigation policy

    International Nuclear Information System (INIS)

    Zhang, Dongjie; Liu, Pei; Ma, Linwei; LI, Zheng

    2013-01-01

    A great challenge China's power sector faces is to mitigate its carbon emissions whilst satisfying the ever-increasing power demand. Optimal planning of the power sector with consideration of carbon mitigation for a long-term future remains a complex task, involving many technical alternatives and an infinite number of possible plants installations, retrofitting, and decommissioning over the planning horizon. Previously the authors built a multi-period optimization model for the planning of China's power sector during 2010–2050. Based on that model, this paper executed calculations on the optimal pathways of China's power sector with two typical decision-making modes, which are based on “full-information” and “limited-information” hypothesis, and analyzed the impacts on the optimal planning results by two typical types of carbon tax policies including a “continuous and stable” one and a “loose first and tight later” one. The results showed that making carbon tax policy for long-term future, and improving the continuity and stability in policy execution can effectively help reduce the accumulated total carbon emissions, and also the cost for carbon mitigation of the power sector. The conclusion of this study is of great significance for the policy makers to make carbon mitigation policies in China and other countries as well. - Highlights: • A multi-stage optimization model for planning the power sector is applied as basis. • Difference of ideal and actual decision making processes are proposed and analyzed. • A “continuous and stable” policy and a “loose first and tight later” one are designed. • 4 policy scenarios are studied applying the optimal planning model and compared. • The importance of “continuous and stable” policy for long term is well demonstrated

  9. Appalachian Stream Mitigation Workshop

    Science.gov (United States)

    A 5 day workshop in 2011 developed for state and federal regulatory and resource agencies, who review, comment on and/or approve compensatory mitigation plans for surface coal mining projects in Appalachia

  10. Wildlife

    Energy Technology Data Exchange (ETDEWEB)

    Cadwell, L.L.; Simmons, M.A.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the significant activities conducted in 1994 to monitor the wildlife resources of the Site. Wildlife populations inhabiting the Hanford Site are monitored in order to measure the status and condition of the populations and assess effects of Hanford operations.

  11. Wildlife

    International Nuclear Information System (INIS)

    Cadwell, L.L.; Simmons, M.A.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the significant activities conducted in 1994 to monitor the wildlife resources of the Site. Wildlife populations inhabiting the Hanford Site are monitored in order to measure the status and condition of the populations and assess effects of Hanford operations

  12. Fuels planning: science synthesis and integration; environmental consequences fact sheet 15: The Wildlife Habitat Response Model

    Science.gov (United States)

    David Pilliod

    2005-01-01

    The Wildlife Habitat Response Model (WHRM) is a Web-based computer tool for evaluating the potential effects of fuel-reduction projects on terrestrial wildlife habitats. It uses species-habitat associations in ponderosa pine (Pinus ponderosa), dry-type Douglas-fir (Pseudotsuga menziesii), lodgepole pine (Pinus...

  13. Annual Water Management Program Report Prime Hook National Wildlife Refuge 1997

    Data.gov (United States)

    Department of the Interior — This report summarizes the results of Prime Hook National Wildlife Refuge’s 1996 annual water management program and describes plans for 1997. The main objective of...

  14. Mitigating Reptile Road Mortality: Fence Failures Compromise Ecopassage Effectiveness

    Science.gov (United States)

    Baxter-Gilbert, James H.; Riley, Julia L.; Lesbarrères, David; Litzgus, Jacqueline D.

    2015-01-01

    Roadways pose serious threats to animal populations. The installation of roadway mitigation measures is becoming increasingly common, yet studies that rigorously evaluate the effectiveness of these conservation tools remain rare. A highway expansion project in Ontario, Canada included exclusion fencing and ecopassages as mitigation measures designed to offset detrimental effects to one of the most imperial groups of vertebrates, reptiles. Taking a multispecies approach, we used a Before-After-Control-Impact study design to compare reptile abundance on the highway before and after mitigation at an Impact site and a Control site from 1 May to 31 August in 2012 and 2013. During this time, radio telemetry, wildlife cameras, and an automated PIT-tag reading system were used to monitor reptile movements and use of ecopassages. Additionally, a willingness to utilize experiment was conducted to quantify turtle behavioral responses to ecopassages. We found no difference in abundance of turtles on the road between the un-mitigated and mitigated highways, and an increase in the percentage of both snakes and turtles detected dead on the road post-mitigation, suggesting that the fencing was not effective. Although ecopassages were used by reptiles, the number of crossings through ecopassages was lower than road-surface crossings. Furthermore, turtle willingness to use ecopassages was lower than that reported in previous arena studies, suggesting that effectiveness of ecopassages may be compromised when alternative crossing options are available (e.g., through holes in exclusion structures). Our rigorous evaluation of reptile roadway mitigation demonstrated that when exclusion structures fail, the effectiveness of population connectivity structures is compromised. Our project emphasizes the need to design mitigation measures with the biology and behavior of the target species in mind, to implement mitigation designs in a rigorous fashion, and quantitatively evaluate road

  15. Mitigating reptile road mortality: fence failures compromise ecopassage effectiveness.

    Directory of Open Access Journals (Sweden)

    James H Baxter-Gilbert

    Full Text Available Roadways pose serious threats to animal populations. The installation of roadway mitigation measures is becoming increasingly common, yet studies that rigorously evaluate the effectiveness of these conservation tools remain rare. A highway expansion project in Ontario, Canada included exclusion fencing and ecopassages as mitigation measures designed to offset detrimental effects to one of the most imperial groups of vertebrates, reptiles. Taking a multispecies approach, we used a Before-After-Control-Impact study design to compare reptile abundance on the highway before and after mitigation at an Impact site and a Control site from 1 May to 31 August in 2012 and 2013. During this time, radio telemetry, wildlife cameras, and an automated PIT-tag reading system were used to monitor reptile movements and use of ecopassages. Additionally, a willingness to utilize experiment was conducted to quantify turtle behavioral responses to ecopassages. We found no difference in abundance of turtles on the road between the un-mitigated and mitigated highways, and an increase in the percentage of both snakes and turtles detected dead on the road post-mitigation, suggesting that the fencing was not effective. Although ecopassages were used by reptiles, the number of crossings through ecopassages was lower than road-surface crossings. Furthermore, turtle willingness to use ecopassages was lower than that reported in previous arena studies, suggesting that effectiveness of ecopassages may be compromised when alternative crossing options are available (e.g., through holes in exclusion structures. Our rigorous evaluation of reptile roadway mitigation demonstrated that when exclusion structures fail, the effectiveness of population connectivity structures is compromised. Our project emphasizes the need to design mitigation measures with the biology and behavior of the target species in mind, to implement mitigation designs in a rigorous fashion, and quantitatively

  16. 78 FR 70318 - Cat Island National Wildlife Refuge; West Feliciana Parish, Louisiana; Notice of Intent To...

    Science.gov (United States)

    2013-11-25

    ...-FF04R02000] Cat Island National Wildlife Refuge; West Feliciana Parish, Louisiana; Notice of Intent To... comprehensive conservation plan (CCP) and associated National Environmental Policy Act (NEPA) documents for Cat... NEPA documents for Cat Island National Wildlife Refuge NWR, West Feliciana Parish, Louisiana, in a...

  17. 75 FR 66387 - Endangered and Threatened Wildlife and Plants; Assisting States, Federal Agencies, and Tribes in...

    Science.gov (United States)

    2010-10-28

    ...] Endangered and Threatened Wildlife and Plants; Assisting States, Federal Agencies, and Tribes in Managing...) announces the availability for public review of a draft national plan to assist States, Federal agencies... Management, National Park Service, and FWS; St. Regis Mohawk Tribe; Kentucky Department of Fish and Wildlife...

  18. Mitigation action plan for liquid waste sites in the 100-BC-1, 100-DR-1, and 100-HR-1 units

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-05-01

    A Record of Decision (ROD) was issued for remediation of waste sites in the 100-BC-1, 100-DR-1, and 100-HR-1 Operable Units in the 100 Area of the Hanford Site. This Mitigation Action Plan (MAP) explains how mitigation measures for these remedial activities will be planned and implemented. The new activities planned in the ROD are not anticipated to result in releases of hazardous substances and will minimize disturbance of currently undisturbed areas. However, certain actions required by the ROD may result in the redisturbance of areas of recovering vegetation. This MAP presents a strategy for limiting disturbances and identifies an opportunity for revegetating a previously disturbed site; the knowledge gained from this demonstration project can be applied to final revegetation of the rest of the remediated sites and sites disturbed during cleanup when remediation of an area is completed. This work will be conducted in coordination with the Natural Resource Trustees Council and Native American Tribes to help minimize impacts to natural resources and cultural resources from project activities and to restore the remediated sites to an appropriate level of habitat

  19. 78 FR 5481 - Quagga Mussel Strategic Planning Meeting

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-HQ-FHC-2013-N008; 94140-1341-0000-N5] Quagga Mussel Strategic Planning Meeting AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: This notice announces a meeting to gather information for planning an FY13 strategy to...

  20. 76 FR 33777 - Stewart B. McKinney National Wildlife Refuge, Middlesex County, CT; Comprehensive Conservation...

    Science.gov (United States)

    2011-06-09

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R5-R-2011-N043; BAC-4311-K9-S3] Stewart B. McKinney National Wildlife Refuge, Middlesex County, CT; Comprehensive Conservation Plan and... headquarters located in Middlesex County, CT. This notice complies with our CCP policy to: (1) Advise other...

  1. Wildlife Trade and Human Health in Lao PDR: An Assessment of the Zoonotic Disease Risk in Markets.

    Directory of Open Access Journals (Sweden)

    Zoe F Greatorex

    Full Text Available Although the majority of emerging infectious diseases can be linked to wildlife sources, most pathogen spillover events to people could likely be avoided if transmission was better understood and practices adjusted to mitigate risk. Wildlife trade can facilitate zoonotic disease transmission and represents a threat to human health and economies in Asia, highlighted by the 2003 SARS coronavirus outbreak, where a Chinese wildlife market facilitated pathogen transmission. Additionally, wildlife trade poses a serious threat to biodiversity. Therefore, the combined impacts of Asian wildlife trade, sometimes termed bush meat trade, on public health and biodiversity need assessing. From 2010 to 2013, observational data were collected in Lao PDR from markets selling wildlife, including information on volume, form, species and price of wildlife; market biosafety and visitor origin. The potential for traded wildlife to host zoonotic diseases that pose a serious threat to human health was then evaluated at seven markets identified as having high volumes of trade. At the seven markets, during 21 observational surveys, 1,937 alive or fresh dead mammals (approximately 1,009 kg were observed for sale, including mammals from 12 taxonomic families previously documented to be capable of hosting 36 zoonotic pathogens. In these seven markets, the combination of high wildlife volumes, high risk taxa for zoonoses and poor biosafety increases the potential for pathogen presence and transmission. To examine the potential conservation impact of trade in markets, we assessed the status of 33,752 animals observed during 375 visits to 93 markets, under the Lao PDR Wildlife and Aquatic Law. We observed 6,452 animals listed by Lao PDR as near extinct or threatened with extinction. The combined risks of wildlife trade in Lao PDR to human health and biodiversity highlight the need for a multi-sector approach to effectively protect public health, economic interests and

  2. Wildlife Trade and Human Health in Lao PDR: An Assessment of the Zoonotic Disease Risk in Markets

    Science.gov (United States)

    Singhalath, Sinpakone; Silithammavong, Soubanh; Khammavong, Kongsy; Fine, Amanda E.; Weisman, Wendy; Douangngeun, Bounlom; Theppangna, Watthana; Keatts, Lucy; Gilbert, Martin; Karesh, William B.; Hansel, Troy; Zimicki, Susan; O’Rourke, Kathleen; Joly, Damien O.; Mazet, Jonna A. K.

    2016-01-01

    Although the majority of emerging infectious diseases can be linked to wildlife sources, most pathogen spillover events to people could likely be avoided if transmission was better understood and practices adjusted to mitigate risk. Wildlife trade can facilitate zoonotic disease transmission and represents a threat to human health and economies in Asia, highlighted by the 2003 SARS coronavirus outbreak, where a Chinese wildlife market facilitated pathogen transmission. Additionally, wildlife trade poses a serious threat to biodiversity. Therefore, the combined impacts of Asian wildlife trade, sometimes termed bush meat trade, on public health and biodiversity need assessing. From 2010 to 2013, observational data were collected in Lao PDR from markets selling wildlife, including information on volume, form, species and price of wildlife; market biosafety and visitor origin. The potential for traded wildlife to host zoonotic diseases that pose a serious threat to human health was then evaluated at seven markets identified as having high volumes of trade. At the seven markets, during 21 observational surveys, 1,937 alive or fresh dead mammals (approximately 1,009 kg) were observed for sale, including mammals from 12 taxonomic families previously documented to be capable of hosting 36 zoonotic pathogens. In these seven markets, the combination of high wildlife volumes, high risk taxa for zoonoses and poor biosafety increases the potential for pathogen presence and transmission. To examine the potential conservation impact of trade in markets, we assessed the status of 33,752 animals observed during 375 visits to 93 markets, under the Lao PDR Wildlife and Aquatic Law. We observed 6,452 animals listed by Lao PDR as near extinct or threatened with extinction. The combined risks of wildlife trade in Lao PDR to human health and biodiversity highlight the need for a multi-sector approach to effectively protect public health, economic interests and biodiversity. PMID:27008628

  3. 44 CFR 201.7 - Tribal Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ... initiatives. (2) A risk assessment that provides the factual basis for activities proposed in the strategy to... significant, even if they cannot be valued in monetary terms. (3) A mitigation strategy that provides the Indian tribal government's blueprint for reducing the potential losses identified in the risk assessment...

  4. Auditing wildlife

    Directory of Open Access Journals (Sweden)

    B.K. Reilly

    2003-12-01

    Full Text Available Reilly B.K. and Y. Reilly. 2003. Auditing wildlife. Koedoe 46(2: 97–102. Pretoria. ISSN 0075-6458. Accountants and auditors are increasingly confronted with the problem of auditing wildlife populations on game ranches as their clients' asset base expands into this industry. This paper aims to provide guidelines on these actions based on case study data and research in the field of wildlife monitoring. Parties entering into dispute on numbers of animals on a property often resort to their auditors for advice. This paper tracks a method of deciding on whether or not to audit the population based on wildlife value and an initial sample count. This will act as a guideline for the accounting profession when confronted by this problem.

  5. Impact mitigation in EIA

    OpenAIRE

    Bond, Alan; Cashmore, Matthew; Cobb, Dick; Tinker, Lauren

    2005-01-01

    This study analysed 40 planning applications in the East of England to investigate the practice of translating paper recommendations in the environmental statement (ES) into legal conditions and obligations. A high proportion (50%) of suggested mitigation measures were not translated into planning conditions or obligations. However, a significant number of additional conditions or obligations, not directly based on the ES, were imposed on developers. The research su...

  6. Radon mitigation in schools

    International Nuclear Information System (INIS)

    Leovic, K.W.; Craig, A.B.; Saum, D.W.

    1990-01-01

    This article reports on radon mitigation in school buildings. Subslab depressurization (SSD) has been the most successful and widely used radon reduction method in houses. Thus far, it has also substantially reduced radon levels in a number of schools. Schools often have interior footings or thickened slabs that may create barriers for subslab air flow if a SSD system is the mitigation option. Review of foundation plans and subslab air flow testing will help to determine the presence and effect of such barriers. HVAC systems in schools vary considerable and tend to have a greater influence on pressure differentials (and consequently radon levels) than do heating and air-conditioning systems encountered in the radon mitigation of houses. As part of any radon mitigation method, ASHRAE Standard 62-1989 should be consulted to determine if the installed HVAC system is designed and operated to achieve minimum ventilation standards for indoor air quality

  7. 40 CFR 51.860 - Mitigation of air quality impacts.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Mitigation of air quality impacts. 51... Federal Actions to State or Federal Implementation Plans § 51.860 Mitigation of air quality impacts. Link... mitigate air quality impacts must be identified and the process for implementation and enforcement of such...

  8. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  9. 75 FR 21649 - Endangered and Threatened Wildlife and Plants; Attwater's Prairie-Chicken (Tympanuchus cupido...

    Science.gov (United States)

    2010-04-26

    ...] Endangered and Threatened Wildlife and Plants; Attwater's Prairie-Chicken (Tympanuchus cupido attwateri... availability of the Attwater's Prairie-Chicken (Tympanuchus cupido attwateri) Recovery Plan, Second Revision. A recovery plan was originally completed for the Attwater's prairie-chicken in 1983 and revised in 1993...

  10. A phytosociological classification of the Hlane Wildlife Sanctuary, Swaziland

    Directory of Open Access Journals (Sweden)

    W.P.D. Gertenbach

    1978-09-01

    Full Text Available A phytosociological classification of the vegetation of the Hiane Wildlife Sanctuary was undertaken, with special reference to the vegetation structure and the correlation between plant communities and the biotic and abiotic environment. This study contributes to the drafting of a management plan for the sanctuary.

  11. Transparency and communication can improve wildlife welfare outcomes: A case of kangaroos

    Directory of Open Access Journals (Sweden)

    Simmons Peter

    2017-01-01

    Full Text Available All countries manage human and wildlife coexistence. Where traditionally humans may have killed animals perceived to be a problem, this is often no longer legal or socially acceptable. Decision-makers tend to feel less strongly about coexistence issues than the people who attempt to influence them on behalf of human or wildlife interests. It has been argued that links between human interests and decisions affecting wildlife should be transparent, and that open decision making processes involving a range of local stakeholders will improve outcomes for humans and wildlife. This paper examines one case incident in an ongoing conflict between an international car racing track and kangaroos that have occasionally been found on the track during a race, causing danger to themselves and race participants. A secret local government report and plan to cull kangaroos was obtained using Freedom of Information legislation. When released to the media the subsequent public discussion showed a much greater concern for kangaroo stress, harm and right to live than the official report, and called for consideration of a range of alternatives to culling. This led to postponement of culling plans, and commitment to a more open community discussion of options. The case clearly supports claims that greater transparency and local stakeholder participation in management decision processes can improve welfare outcomes for non-human animals.

  12. Regional economic effects of current and proposed management alternatives for Arrowwood National Wildlife Refuge

    Science.gov (United States)

    Koontz, Lynne; Lambert, Heather

    2005-01-01

    The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan (CCP). The CCP must describe the desired future conditions of a Refuge and provide long range guidance and management direction to achieve Refuge purposes. Arrowwood National Wildlife Refuge (NWR), located along the James River in east central North Dakota, is in the process of developing a range of management goals, objectives, and strategies for the CCP. The CCP for Arrowwood NWR must contain an analysis of expected effects associated with current and proposed Refuge management strategies.

  13. A multi-period superstructure optimisation model for the optimal planning of China's power sector considering carbon dioxide mitigation

    International Nuclear Information System (INIS)

    Zhang Dongjie; Ma Linwei; Liu Pei; Zhang Lili; Li Zheng

    2012-01-01

    Power sector is the largest CO 2 emitter in China. To mitigate CO 2 emissions for the power sector is a tough task, which requires implementation of targeted carbon mitigation policies. There might be multiple forms for carbon mitigation policies and it is still unclear which one is the best for China. Applying a superstructure optimisation model for optimal planning of China's power sector built by the authors previously, which was based on real-life plants composition data of China's power sector in 2009, and could incorporate all possible actions of the power sector, including plants construction, decommission, and application of carbon capture and sequestration (CCS) on coal-fuelled plants, the implementation effects of three carbon mitigation policies were studied quantitatively, achieving a conclusion that the so-called “Surplus-Punishment and Deficit-Award” carbon tax policy is the best from the viewpoint of increasing CO 2 reduction effect and also reducing the accumulated total cost. Based on this conclusion, the corresponding relationships between CO 2 reduction objectives (including the accumulated total emissions reduction by the objective year and the annual emissions reduction in the objective year) were presented in detail. This work provides both directional and quantitative suggestions for China to make carbon mitigation policies in the future. - Highlights: ► We study the best form of carbon mitigation policy for China's power sector. ► We gain quantitative relationship between CO 2 reduction goal and carbon tax policy. ► The “Surplus-Punishment and Deficit-Award” carbon tax policy is the best. ► Nuclear and renewable power and CCS can help greatly reduce CO 2 emissions of the power sector. ► Longer objective period is preferred from the viewpoint of policy making.

  14. A summary of fish and wildlife information needs to surface mine coal in the United States. Part 1. Fish and wildlife information needs in the federal surface mining permanent regulations. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    This is part 1 of three part series to assist government agencies and private citizens in determining fish and wildlife information needs for new coal mining operations pursuant to the Surface Mining Control and Reclamation Act of 1977. Part 2 will document status of individual state surface mining regulations as of January 1980 in those states having significant strippable reserves and/or active strip mining operations. It will also provide documentation of fish and wildlife information needs identified in the state regulations of compliance to PL 95-87. Part 3 will be a discussion of the information needed to develop the Fish and Wildlife Plan identified in the Permanent Regulations. The objective of this three part series is to include consideration of fish and wildlife resources in the surface mining process.

  15. 78 FR 48183 - Rocky Mountain Arsenal National Wildlife Refuge, Commerce City, CO; Comprehensive Conservation...

    Science.gov (United States)

    2013-08-07

    ... Plan and Environmental Impact Statement; Two Ponds National Wildlife Refuge, Arvada, CO; Comprehensive... prepare a Comprehensive Conservation Plan (CCP) and an Environmental Impact Statement (EIS) for the Rocky..., including more than 120 species of birds, coyote and red fox, muskrat, raccoon, and beaver, deer, several...

  16. Firewood and wildlife

    Science.gov (United States)

    Andrew B. Carey; John D. Gill

    1980-01-01

    The increased demand for firewood threatens the habitat of many wildlife species. Dead or dying trees that commonly are cut for firewood are vital to wildlife species that nest in tree cavities. Likewise, healthy trees of many species preferred for firewood are important components of wildlife habitat. Tree species or species groups are value-rated for both firewood...

  17. Study plan for evaluating carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 2 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one report of four that the Pacific Northwest National Laboratory (PNNL) staff used to address Measure 7.1A in the Northwest Power Planning Council's (Council) fish and Wildlife Program (Program) dated December 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for the development of a study plan based on the critical uncertainties and research needs identified during the evaluation. In the evaluation of carrying capacity the authors concluded that defining capacity and listing the determinants of capacity is not a simple exercise. Capacity is a complex variable among the attributes that all together define salmon performance. To pursue the capacity parameter, that is, a single number or set of numbers that quantify how many salmon the basin or any part of the basin can support, will not lead to the development of a useful study plan. To increase understanding of ecology, carrying capacity, and limiting factors, it is necessary to deal with the complexity of the sustained performance of salmon in the Columbia River Basin. This report describes the elements of a study plan that could be used to increase the understanding of ecology, carrying capacity, and limiting factors that influence salmon survival under current conditions

  18. Social and Economic Aspects of the Transmission of Pathogenic Bacteria between Wildlife and Food Animals: A Thematic Analysis of Published Research Knowledge.

    Science.gov (United States)

    Fournier, A; Young, I; Rajić, A; Greig, J; LeJeune, J

    2015-09-01

    Wildlife is a known reservoir of pathogenic bacteria, including Mycobacterium bovis and Brucella spp. Transmission of these pathogens between wildlife and food animals can lead to damaging impacts on the agri-food industry and public health. Several international case studies have highlighted the complex and cross-sectoral challenges involved in preventing and managing these potential transmission risks. The objective of our study was to develop a better understanding of the socio-economic aspects of the transmission of pathogenic bacteria between wildlife and food animals to support more effective and sustainable risk mitigation strategies. We conducted qualitative thematic analysis on a purposive sample of 30/141 articles identified in a complementary scoping review of the literature in this area and identified two key themes. The first related to the framing of this issue as a 'wicked problem' that depends on a complex interaction of social factors and risk perceptions, governance and public policy, and economic implications. The second theme consisted of promising approaches and strategies to prevent and mitigate the potential risks from transmission of pathogenic bacteria between wildlife and food animals. These included participatory, collaborative and multidisciplinary decision-making approaches and the proactive incorporation of credible scientific evidence and local contextual factors into solutions. The integration of these approaches to address 'wicked problems' in this field may assist stakeholders and decision-makers in improving the acceptability and sustainability of future strategies to reduce the transmission of pathogenic bacteria between wildlife and food animals. © 2015 Zoonoses and Public Health © 2015 Her Majesty the Queen in Right of Canada Reproduced with the permission of the Minister of the Public Health Agency of Canada.

  19. Shillapoo Wildlife Area 2007 Follow-up HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-03-01

    In April and May 2007 the Regional HEP Team (RHT) conducted a follow-up HEP analysis on the Egger (612 acres) and Herzog (210 acres) parcels located at the north end of the Shillapoo Wildlife Area. The Egger and Herzog parcels have been managed with Bonneville Power Administration funds since acquired in 1998 and 2001 respectively. Slightly more than 936 habitat units (936.47) or 1.14 HUs per acre was generated as an outcome of the 2007 follow-up HEP surveys. Results included 1.65 black-capped chickadee HUs, 280.57 great blue heron HUs, 581.45 Canada goose HUs, 40 mallard HUs, and 32.80 mink HUs. Introduction A follow-up Habitat Evaluation Procedures (HEP) (USFWS 1980) analysis was conducted by the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) during April and May 2007 to document changes in habitat quality and to determine the number of habitat units (HUs) to credit Bonneville Power Administration (BPA) for providing operation and maintenance (O&M) funds since WDFW acquired the parcels. The 2007 follow-up HEP evaluation was limited to Shillapoo Wildlife Area (SWA) parcels purchased with Bonneville Power Administration funds. D. Budd (pers. comm.) reported WDFW purchased the 612 acre Egger Farms parcel on November 2, 1998 for $1,737,0001 and the 210 acre Herzog acquisition on June 21, 2001 for $500,000 with Memorandum of Agreement funds (BPA and WDFW 1996) as partial fulfillment of BPA's wildlife mitigation obligation for construction of Bonneville and John Day Dams (Rasmussen and Wright 1989). Anticipating the eventual acquisition of the Egger and Herzog properties, WDFW conducted HEP surveys on these lands in 1994 to determine the potential number of habitat units to be credited to BPA. As a result, HEP surveys and habitat unit calculations were completed as much as seven years prior to acquiring the sites. The term 'Shillapoo Wildlife Area' will be used to describe only the Herzog and Egger parcels in this

  20. Benefits of interrelationships between climate change mitigation and adaptation

    DEFF Research Database (Denmark)

    Møller, Lea Ravnkilde; Jacobsen, Jette Bredahl

    2014-01-01

    and product 2: climate change adaptation. The production possibilities frontier (PPF) summarises the production benefits of the two products. The case study of the paper is the replanting of mangrove forests in the coastal wetland areas of Peam Krasaob Wildlife Sanctuary in Cambodia. The benefits of climate...... benefits of climate change mitigation and adaptation are tested under different climate change scenarios, seeing as the impact and frequency of storms can have a significant effect on coastal wetland areas and the replanting of the mangrove forests and therefore also on the joint benefits of climate change...

  1. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Easterbrooks, John A. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council and funded by the Bonneville Power Administration. The YKFP has adopted the definition of supplementation described by Regional Assessment of Supplementation Program (1992), which is ''the use of artificial propagation in an attempt to maintain or increase natural production while maintaining the long-term fitness of the target population, and keeping the ecological and genetic impacts on nontarget populations within specified biological limits''. Recent scientific reviews of hatchery supplementation continue to highlight the experimental nature and risk of supplementation (Independent Scientific Group 1996; National Research Council 1996; Lichatowich 1999; Independent Multidisciplinary Science Team 2000; Independent Scientific Advisory Board 2003; Hatchery Scientific Review Group 2003). In addition, many of these reviews included recommendations about the best ways to operate a supplementation program. Most of these recommendations were already being done or have been incorporated into the YKFP. The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and

  2. Enhancing sediment flux control and natural hazard risk mitigation through a structured conceptual planning approach

    Science.gov (United States)

    Simoni, S.; Vignoli, G.; Mazzorana, B.

    2017-08-01

    Sediment fluxes from mountain rivers contribute to shape the geomorphologic features of lowland rivers and to establish the physical basis for an optimal set of ecosystem functions and related services to people. Through significant public funding, the hydro-morphological regimes of mountain rivers in the European Alps have been progressively altered over the last century, with the aim to provide a safe dwelling space, to boost transport, mobility and to support economic growth. We claim that the underlying planning weaknesses contribute to determine these inefficient resource allocations, since flood risk is still high and the ecosystem services are far from being optimal. Hence, with the overall aim to enhance sediment flux control and hazard risk mitigation in such heavily modified alpine streams, we propose a structured design workflow which guides the planner through system analysis and synthesis. As a first step the proposed workflow sets the relevant planning goals and assesses the protection structure functionality. Then a methodology is proposed to achieve the goals. This methodology consists in characterising the hydrologic basin of interest and the sediment availability and determining the sediment connectivity to channels. The focus is set on the detailed analysis of existing river cross sections where the sediment continuity is interrupted (e.g. slit and check dams). By retaining relevant sediment volumes these structures prevent the reactivation of hydro-morphological and associated ecological functionalities. Since their actual performance can be unsatisfying with respect to flood risk mitigation (e.g. mainly old structures), we introduce specific efficiency indicators as a support for the conceptual design stage to quantify effects related to sediment flux control and risk management. The proposed planning approach is then applied to the Gadria system (stream, slit dam, retention basin and culvert), located in South Tyrol, Italy. This case study

  3. Threatened and Endangered Species Habitat Management Plan for Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Keller, David Charles [Los Alamos National Laboratory; Hathcock, Charles Dean [Los Alamos National Laboratory

    2015-11-17

    Los Alamos National Laboratory’s (LANL) Threatened and Endangered Species Habitat Management Plan (HMP) fulfills a commitment made to the U.S. Department of Energy (DOE) in the “Final Environmental Impact Statement for the Dual-Axis Radiographic Hydrodynamic Test Facility Mitigation Action Plan” (DOE 1996). The HMP received concurrence from the U.S. Fish and Wildlife Service (USFWS) in 1999 (USFWS consultation numbers 2-22-98-I-336 and 2-22-95-I-108). This 2015 update retains the management guidelines from the 1999 HMP for listed species, updates some descriptive information, and adds the New Mexico Meadow Jumping Mouse (Zapus hudsonius luteus) and Yellow-billed Cuckoo (Coccyzus americanus) which were federally listed in 2014 (Keller 2015: USFWS consultation number 02ENNM00- 2015-I-0538).

  4. US 93 north wildlife-vehicle collision and wildlife crossing monitoring.

    Science.gov (United States)

    2015-01-01

    Human safety: Wildlife-vehicle collisions : Habitat connectivity: Wildlife use crossing structures : Cost-benefit analyses : Contract research : WTI-MSU and CSKT : Students and other partners at MSU and UofM

  5. Pilot testing and protocol development of giant applesnail suppression at Mandalay National Wildlife Refuge, Louisiana—July–October 2017

    Science.gov (United States)

    Carter, Jacoby; Merino, Sergio

    2018-03-19

    This report provides an overview of the pilot study and description of the techniques developed for a future mitigation study of Pomacea maculata (giant applesnail) at the U.S. Fish and Wildlife Service Mandalay National Wildlife Refuge, Louisiana (MNWR). Egg mass suppression is a potential strategy for the mitigation of the invasive giant applesnail. In previous studies at Langan Municipal Park in Mobile, Alabama (LMP), and National Park Service Jean Lafitte National Park-Barataria Unit, Louisiana (JLNP), we determined that spraying food-grade oil (coconut oil or Pam™ spray) on egg masses significantly reduced egg hatching. At JLNP we also developed methods to estimate snail population size. The purpose of this pilot study was to adapt techniques developed for previous studies to the circumstances of MNWR in preparation for a larger experiment whereby we will test the effectiveness of egg mass suppression as an applesnail mitigation tool. We selected four canals that will be used as treatment and control sites for the experiment (two each). We established that an efficient way to destroy egg masses is to knock them down with a high-velocity stream of water pumped directly from the canal. The traps used at JLNP had to be modified to accommodate the greater range of water-level fluctuation at MNWR. One of the three marking methods used at JLNP was selected for use at MNWR.

  6. Wind and wildlife in the Northern Great Plains: identifying low-impact areas for wind development.

    Directory of Open Access Journals (Sweden)

    Joseph Fargione

    Full Text Available Wind energy offers the potential to reduce carbon emissions while increasing energy independence and bolstering economic development. However, wind energy has a larger land footprint per Gigawatt (GW than most other forms of energy production and has known and predicted adverse effects on wildlife. The Northern Great Plains (NGP is home both to some of the world's best wind resources and to remaining temperate grasslands, the most converted and least protected ecological system on the planet. Thus, appropriate siting and mitigation of wind development is particularly important in this region. Steering energy development to disturbed lands with low wildlife value rather than placing new developments within large and intact habitats would reduce impacts to wildlife. Goals for wind energy development in the NGP are roughly 30 GW of nameplate capacity by 2030. Our analyses demonstrate that there are large areas where wind development would likely have few additional impacts on wildlife. We estimate there are ∼1,056 GW of potential wind energy available across the NGP on areas likely to have low-impact for biodiversity, over 35 times development goals. New policies and approaches will be required to guide wind energy development to low-impact areas.

  7. 75 FR 22838 - Cape Romain National Wildlife Refuge, Charleston County, SC

    Science.gov (United States)

    2010-04-30

    ... the Service's Internet site: http://southeast.fws.gov/planning /. FOR FURTHER INFORMATION CONTACT: Ms... occur based on available staffing, additional volunteers, and academic research. Wildlife-dependent.... ADDRESSES: Send comments, questions, and requests for information to: Ms. Raye Nilus, Project Leader, Cape...

  8. 75 FR 11195 - Central Arkansas National Wildlife Refuge Complex, Arkansas

    Science.gov (United States)

    2010-03-10

    ... impact. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the availability of our final comprehensive conservation plan (CCP) and finding of no significant impact (FONSI) for the environmental..., no moist-soil impoundments and croplands, and no more road, beaver dam, or invasive species...

  9. Final environmental impact statement for the Nevada Test Site and off-site locations in the state of Nevada: Mitigation action plan

    International Nuclear Information System (INIS)

    1997-02-01

    The DOE Notice of Availability for this environmental impact statement was published in the Federal Register on Friday, October 18, 1996 (61 FR 54437). The final environmental impact statement identifies potential adverse effects resulting from the four use alternatives evaluated and discusses measures that DOE considered for the mitigation of these potential adverse effects. The Secretary of Energy signed the Record of Decision on the management and operation of the Nevada Test Site and other DOE sites in the state of Nevada on December 9, 1996. These decisions will result in the continuation of the multipurpose, multi-program use of the Nevada Test Site, under which DOE will pursue a further diversification of interagency, private industry, and public-education uses while meeting its Defense Program, Waste Management, and Environmental Restoration mission requirements at the Nevada Test Site and other Nevada sites, including the Tonopah Test Range, the Project Shoal Site, the Central Nevada Test Area, and on the Nellis Air Force Range Complex. The Record of Decision also identifies specific mitigation actions beyond the routine day-to-day physical and administrative controls needed for implementation of the decisions. These specific mitigation actions are focused on the transportation of waste and on groundwater availability. This Mitigation Action Plan elaborates on these mitigation commitments

  10. The impact of earthquakes on the city of Aigio in Greece. Urban planning as a factor in mitigating seismic damage

    International Nuclear Information System (INIS)

    Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos

    2008-01-01

    This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation

  11. The impact of earthquakes on the city of Aigio in Greece. Urban planning as a factor in mitigating seismic damage.

    Science.gov (United States)

    Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos

    2008-07-01

    This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation.

  12. Man-Made Wildlife Tourism Destination: The Visitors Perspective on Lok Kawi Wildlife Park, Sabah, Malaysia

    OpenAIRE

    Boyd Sun Fatt; Johnny Cindy; Bakansing Shirley M.

    2014-01-01

    Sabah is blessed with natural forest habitats and rich with floras and faunas. Amongst its’ attraction is wildlife endemism. Lok Kawi Wildlife Park was established to provide an alternative wildlife tourism destination with its inhabitants from the wildlife species of Borneo. Since its opening in 2007, multitudes of tourists have visited the park. However, there has been no study to identify the visitor’s perspective on Lok Kawi Wildlife Park as man-made wildlife tourism destination. The stud...

  13. Columbia River basin fish and wildlife program strategy for salmon

    International Nuclear Information System (INIS)

    Ruff, J.; Fazio, J.

    1993-01-01

    Three species of Snake River salmon have been listed as threatened or endangered under the federal Endangered Species Act. In response, the Northwest Power Planning Council worked with the states of Idaho, Montana, Oregon and Washington, Indian tribes, federal agencies and interest groups to address the status of Snake River salmon runs in a forum known as the Salmon Summit. The Summit met in 1990 and 1991 and reached agreement on specific, short-term actions. When the Summit disbanded in April 1991, responsibility for developing a regional recovery plan for salmon shifted to the Council. The Council responded with a four-phased process of amending its Columbia River Basin Fish and Wildlife Program. The first three phases. completed in September 1992, pertain to salmon and steelhead. Phase four, scheduled for completion in October 1993, will take up issues of resident fish and wildlife. This paper deals with the first three phases, collectively known as Strategy for Salmon

  14. Wildlife reserves, populations, and hunting outcome with smart wildlife

    DEFF Research Database (Denmark)

    Jensen, Frank; Jacobsen, Jette Bredahl; Strange, Niels

    2014-01-01

    We consider a hunting area and a wildlife reserve and answer the question: How does clever migration decision affect the social optimal and the private optimal hunting levels and population stocks? We analyze this in a model allowing for two-way migration between hunting and reserve areas, where...... the populations’ migration decisions depend on both hunting pressure and relative population densities. In the social optimum a pure stress effect on the behavior of smart wildlife exists. This implies that the population level in the wildlife reserve tends to increase and the population level in the hunting area...... and hunting levels tend to decrease. On the other hand, the effect on stock tends to reduce the population in the wildlife reserve and increase the population in the hunting area and thereby also increase hunting. In the case of the private optimum, open-access is assumed and we find that the same qualitative...

  15. Regional economic effects of current and proposed management alternatives for Sand Lake National Wildlife Refuge

    Science.gov (United States)

    Koontz, Lynne; Lambert, Heather

    2005-01-01

    The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan (CCP). The CCP must describe the desired future conditions of a Refuge and provide long range guidance and management direction to achieve Refuge purposes. Sand Lake National Wildlife Refuge (NWR), located 27 miles northeast of Aberdeen, South Dakota, is in the process of developing a range of management goals, objectives, and strategies for the CCP. The CCP for Sand Lake NWR must contain an analysis of expected effects associated with current and proposed Refuge management strategies.

  16. 78 FR 29774 - Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear...

    Science.gov (United States)

    2013-05-21

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear Recovery Plan... extending the public comment period for a Draft Revised Supplement to the Grizzly Bear Recovery Plan in the... to the Grizzly Bear Recovery Plan is available at http://www.fws.gov/mountain-prairie/species/mammals...

  17. 78 FR 3909 - Big Oaks National Wildlife Refuge, IN; Glacial Ridge National Wildlife Refuge, MN; Northern...

    Science.gov (United States)

    2013-01-17

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-R-2012-N283; FXRS1265030000-134-FF03R06000] Big Oaks National Wildlife Refuge, IN; Glacial Ridge National Wildlife Refuge, MN; Northern Tallgrass Prairie National Wildlife Refuge, MN; Whittlesey Creek National Wildlife Refuge, WI AGENCY: Fish...

  18. 44 CFR 78.9 - Planning grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  19. Plan well, plan often

    Science.gov (United States)

    Bill Block

    2013-01-01

    This issue includes an invited paper by Courtney Schultz and her colleagues commenting on the application of the newly adopted U.S. Forest Service Planning Rule (hereafter, the rule) for wildlife. The rule is basically implementing language to interpret the spirit and intent of the National Forest Management Act (NFMA) of 1976. Laws such as NFMA require additional...

  20. 76 FR 59153 - Elizabeth Hartwell Mason Neck National Wildlife Refuge, Fairfax County, VA, and Featherstone...

    Science.gov (United States)

    2011-09-23

    ...] Elizabeth Hartwell Mason Neck National Wildlife Refuge, Fairfax County, VA, and Featherstone National... plan (CCP) and finding of no significant impact (FONSI) for Elizabeth Hartwell Mason Neck (Mason Neck...: Download a copy of the document at http://www.fws.gov/northeast/planning/MasonNeck_Featherstone/ccphome...

  1. Contradiction and Complacency Shape Attitudes towards the Toll of Roads on Wildlife

    Directory of Open Access Journals (Sweden)

    Daniel Ramp

    2016-06-01

    Full Text Available Most people in the world now live in cities. Urbanisation simultaneously isolates people from nature and contributes to biodiversity decline. As cities expand, suburban development and the road infrastructure to support them widens their impact on wildlife. Even so, urban communities, especially those on the peri-urban fringe, endeavour to support biodiversity through wildlife friendly gardens, green spaces and corridors, and conservation estates. On one hand, many who live on city fringes do so because they enjoy proximity to nature, however, the ever increasing intrusion of roads leads to conflict with wildlife. Trauma (usually fatal to wildlife and (usually emotional and financial to people ensues. Exposure to this trauma, therefore, should inform attitudes towards wildlife vehicle collisions (WVC and be linked to willingness to reduce risk of further WVC. While there is good anecdotal evidence for this response, competing priorities and better understanding of the likelihood of human injury or fatalities, as opposed to wildlife fatalities, may confound this trend. In this paper we sought to explore this relationship with a quantitative study of driver behaviour and attitudes to WVC from a cohort of residents and visitors who drive through a peri-urban reserve (Royal National Park on the outskirts of Sydney, Australia. We distributed a self-reporting questionnaire and received responses from 105 local residents and 51 visitors to small townships accessed by roads through the national park. We sought the respondents’ exposure to WVC, their evasive actions in an impending WVC, their attitudes to wildlife fatalities, their strategies to reduce the risk of WVC, and their willingness to adopt new ameliorative measures. The results were partitioned by driver demographics and residency. Residents were generally well informed about mitigation strategies but exposure led to a decrease in viewing WVC as very serious. In addition, despite most

  2. Contradiction and Complacency Shape Attitudes towards the Toll of Roads on Wildlife.

    Science.gov (United States)

    Ramp, Daniel; Wilson, Vanessa K; Croft, David B

    2016-06-17

    Most people in the world now live in cities. Urbanisation simultaneously isolates people from nature and contributes to biodiversity decline. As cities expand, suburban development and the road infrastructure to support them widens their impact on wildlife. Even so, urban communities, especially those on the peri-urban fringe, endeavour to support biodiversity through wildlife friendly gardens, green spaces and corridors, and conservation estates. On one hand, many who live on city fringes do so because they enjoy proximity to nature, however, the ever increasing intrusion of roads leads to conflict with wildlife. Trauma (usually fatal) to wildlife and (usually emotional and financial) to people ensues. Exposure to this trauma, therefore, should inform attitudes towards wildlife vehicle collisions (WVC) and be linked to willingness to reduce risk of further WVC. While there is good anecdotal evidence for this response, competing priorities and better understanding of the likelihood of human injury or fatalities, as opposed to wildlife fatalities, may confound this trend. In this paper we sought to explore this relationship with a quantitative study of driver behaviour and attitudes to WVC from a cohort of residents and visitors who drive through a peri-urban reserve (Royal National Park) on the outskirts of Sydney, Australia. We distributed a self-reporting questionnaire and received responses from 105 local residents and 51 visitors to small townships accessed by roads through the national park. We sought the respondents' exposure to WVC, their evasive actions in an impending WVC, their attitudes to wildlife fatalities, their strategies to reduce the risk of WVC, and their willingness to adopt new ameliorative measures. The results were partitioned by driver demographics and residency. Residents were generally well informed about mitigation strategies but exposure led to a decrease in viewing WVC as very serious. In addition, despite most respondents stating they

  3. Man-Made Wildlife Tourism Destination: The Visitors Perspective on Lok Kawi Wildlife Park, Sabah, Malaysia

    Directory of Open Access Journals (Sweden)

    Boyd Sun Fatt

    2014-01-01

    Full Text Available Sabah is blessed with natural forest habitats and rich with floras and faunas. Amongst its’ attraction is wildlife endemism. Lok Kawi Wildlife Park was established to provide an alternative wildlife tourism destination with its inhabitants from the wildlife species of Borneo. Since its opening in 2007, multitudes of tourists have visited the park. However, there has been no study to identify the visitor’s perspective on Lok Kawi Wildlife Park as man-made wildlife tourism destination. The study aims to assist the park’s management for the betterment of the park’s facilities and future development. A convenience sampling and a designed questionnaire was applied in this study, distributed after the visitors visited the park. The results showed that majority of the visitors were Malaysian and only a quarter were foreign visitors. Majority indicated that visiting the park is for recreational outing (holiday and only a few indicated that is an educational visit. Majority of the respondents knew the meaning of wildlife tourism and visiting the park’s is part of wildlife tourism. Most of the respondents came to know about the park’s existence through the local media and mostly agreed that the park indeed provide an authentic learning experience about wildlife, whilst creating wildlife conservation awareness.

  4. A Framework to Evaluate Wildlife Feeding in Research, Wildlife Management, Tourism and Recreation

    Science.gov (United States)

    Dubois, Sara; Fraser, David

    2013-01-01

    Simple Summary Human feeding of wildlife is a world-wide phenomenon with very diverse effects on conservation, animal welfare and public safety. From a review of the motivations, types and consequences of wildlife feeding, an evaluative framework is presented to assist policy-makers, educators and managers to make ethical- and biologically-based decisions about the appropriateness of feeding wildlife in the context of research, wildlife management, tourism and recreation. Abstract Feeding of wildlife occurs in the context of research, wildlife management, tourism and in opportunistic ways. A review of examples shows that although feeding is often motivated by good intentions, it can lead to problems of public safety and conservation and be detrimental to the welfare of the animals. Examples from British Columbia illustrate the problems (nuisance animal activity, public safety risk) and consequences (culling, translocation) that often arise from uncontrolled feeding. Three features of wildlife feeding can be distinguished: the feasibility of control, the effects on conservation and the effects on animal welfare. An evaluative framework incorporating these three features was applied to examples of feeding from the literature. The cases of feeding for research and management purposes were generally found to be acceptable, while cases of feeding for tourism or opportunistic feeding were generally unacceptable. The framework should allow managers and policy-makers to distinguish acceptable from unacceptable forms of wildlife feeding as a basis for policy, public education and enforcement. Many harmful forms of wildlife feeding seem unlikely to change until they come to be seen as socially unacceptable. PMID:26479747

  5. Mitigating global warming: traditional versus alternative approaches in a planning versus a market context

    Energy Technology Data Exchange (ETDEWEB)

    Olerup, Brita [Royal Inst. of Technology, Dept. of Industrial Economics and Management, Stockholm (Sweden)

    2002-06-01

    Economic efficiency tends to be an important argument when different means of environmental control are assessed and suggested. Considering that the most cost-efficient means are not the ones most frequently chosen and used, some other qualities seem to play an equally important role. I use findings from organisational theory and negotiation theory to better understand what is concealed in the black-box of decision-making and implementation. My empirical material consists of case studies of four different means of environmental control used in Sweden during the 1990s to mitigate the threat of global warming. These are an environmental tax, a licensing trial, municipal energy planning, and technology procurement. Each represents a particular discipline (economic, legal, physical planning, or technological) in which a context (planning or market) and an approach (traditional relay race or alternative process-oriented) are combined. Although each means has its particular niche, some qualities stand out as superior. Such means need to be divisible in space as well as in time. It is then easier to get started. Since it is just as easy to deviate from, rather than adhere to, the predetermined course after a while, some incentive must be given to the person in charge of implementation. In other words, the classic proverb of using sticks and carrots is still valid although it is not always taken to heart and practised. (Author)

  6. 77 FR 1078 - San Pablo Bay National Wildlife Refuge, Sonoma, Napa, and Solano Counties, CA; Final...

    Science.gov (United States)

    2012-01-09

    ... locations; develop shoreline fishing locations; and provide some additional environmental education programs... Comprehensive Conservation Plan and Finding of No Significant Impact AGENCY: Fish and Wildlife Service, Interior... availability of our final Comprehensive Conservation Plan (CCP) and finding of no significant impact (FONSI...

  7. Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado

    International Nuclear Information System (INIS)

    1992-07-01

    The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report

  8. Wildlife laws monitoring as an adaptive management tool in protected area management in Ghana: a case of Kakum Conservation Area.

    Science.gov (United States)

    Wiafe, Edward Debrah

    2016-01-01

    The wildlife laws of Ghana alienated the rural communities from forests and material well-being depended upon for their livelihood and this manifests itself in the progressive conflict between the park patrol staff and poachers from the fringes of the protected areas. The main aim of this study was to determine the impact of quantification of patrol efforts on indicators of illegal hunting activities that occur in rainforest protected areas, as a result of monitoring patrol operations and modifying the original plan. The specific objectives were to determine the optimal patrol efforts necessary to reduce illegal wildlife use to minimal; and the influence of the rainfall and seasonal activities on illegal wildlife use. The results indicated that as the patrol efforts increased the encounter with illegal wildlife use also increased until a certain point that the encounter rates started decreasing. Neither rainfall nor seasonal activities influenced the illegal activities and the patrol efforts. The protection staff of rainforest protected areas would work effectively to bring down illegal wildlife off-take to the barest minimum if monitored, quantified and provide feed-back. Illegal wildlife off-take can also be reduced by the protection staff if the original plans are made flexible to be adjusted. Recommendations for further studies have been made.

  9. Multidisciplinary Wildlife Teaching Activities.

    Science.gov (United States)

    Hernbrode, William R., Ed.

    This guide provides information and activities descriptions designed to allow the teacher to use wildlife concepts in the teaching of various subjects. The author suggests that wildlife and animals are tremendous motivators for children and hold their attention. In the process, concepts of wildlife interaction with man and the environment are…

  10. 50 CFR 216.87 - Wildlife research.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Wildlife research. 216.87 Section 216.87 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... Pribilof Islands Administration § 216.87 Wildlife research. (a) Wildlife research, other than research on...

  11. 75 FR 65371 - Klamath Marsh National Wildlife Refuge, Klamath County, OR

    Science.gov (United States)

    2010-10-22

    ... impact. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the availability of the Final Comprehensive Conservation Plan (CCP) and Finding of No Significant Impact (FONSI) for the Klamath Marsh... rails, Oregon spotted frogs, red-naped sapsuckers, pygmy nuthatches, bald eagles, beaver, and red band...

  12. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  13. 78 FR 17708 - Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear...

    Science.gov (United States)

    2013-03-22

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear Recovery Plan... Revised Supplement to the Grizzly Bear Recovery Plan. Specifically, this supplement proposes to revise the demographic recovery criteria for the Yellowstone Ecosystem. In the lower 48 States, Grizzly bears (Ursus...

  14. Mitigation for one & all: An integrated framework for mitigation of development impacts on biodiversity and ecosystem services

    Energy Technology Data Exchange (ETDEWEB)

    Tallis, Heather, E-mail: htallis@tnc.org [The Nature Conservancy, 415 Alta Vista Dr., Santa Cruz, CA 95060 (United States); Kennedy, Christina M., E-mail: ckennedy@tnc.org [The Nature Conservancy, 117 East Mountain Ave., Ft. Collins, CO 80524 (United States); Ruckelshaus, Mary [The Natural Capital Project, 371 Serra Mall, Stanford, CA 94305 (United States); Goldstein, Joshua; Kiesecker, Joseph M. [The Nature Conservancy, 117 East Mountain Ave., Ft. Collins, CO 80524 (United States)

    2015-11-15

    Emerging development policies and lending standards call for consideration of ecosystem services when mitigating impacts from development, yet little guidance exists to inform this process. Here we propose a comprehensive framework for advancing both biodiversity and ecosystem service mitigation. We have clarified a means for choosing representative ecosystem service targets alongside biodiversity targets, identified servicesheds as a useful spatial unit for assessing ecosystem service avoidance, impact, and offset options, and discuss methods for consistent calculation of biodiversity and ecosystem service mitigation ratios. We emphasize the need to move away from area- and habitat-based assessment methods for both biodiversity and ecosystem services towards functional assessments at landscape or seascape scales. Such comprehensive assessments more accurately reflect cumulative impacts and variation in environmental quality, social needs and value preferences. The integrated framework builds on the experience of biodiversity mitigation while addressing the unique opportunities and challenges presented by ecosystem service mitigation. These advances contribute to growing potential for economic development planning and execution that will minimize impacts on nature and maximize human wellbeing. - Highlights: • This is the first framework for biodiversity and ecosystem service mitigation. • Functional, landscape scale assessments are ideal for avoidance and offsets. • Servicesheds define the appropriate spatial extent for ecosystem service mitigation. • Mitigation ratios should be calculated consistently and based on standard factors. • Our framework meets the needs of integrated mitigation assessment requirements.

  15. Mitigation for one & all: An integrated framework for mitigation of development impacts on biodiversity and ecosystem services

    International Nuclear Information System (INIS)

    Tallis, Heather; Kennedy, Christina M.; Ruckelshaus, Mary; Goldstein, Joshua; Kiesecker, Joseph M.

    2015-01-01

    Emerging development policies and lending standards call for consideration of ecosystem services when mitigating impacts from development, yet little guidance exists to inform this process. Here we propose a comprehensive framework for advancing both biodiversity and ecosystem service mitigation. We have clarified a means for choosing representative ecosystem service targets alongside biodiversity targets, identified servicesheds as a useful spatial unit for assessing ecosystem service avoidance, impact, and offset options, and discuss methods for consistent calculation of biodiversity and ecosystem service mitigation ratios. We emphasize the need to move away from area- and habitat-based assessment methods for both biodiversity and ecosystem services towards functional assessments at landscape or seascape scales. Such comprehensive assessments more accurately reflect cumulative impacts and variation in environmental quality, social needs and value preferences. The integrated framework builds on the experience of biodiversity mitigation while addressing the unique opportunities and challenges presented by ecosystem service mitigation. These advances contribute to growing potential for economic development planning and execution that will minimize impacts on nature and maximize human wellbeing. - Highlights: • This is the first framework for biodiversity and ecosystem service mitigation. • Functional, landscape scale assessments are ideal for avoidance and offsets. • Servicesheds define the appropriate spatial extent for ecosystem service mitigation. • Mitigation ratios should be calculated consistently and based on standard factors. • Our framework meets the needs of integrated mitigation assessment requirements

  16. Friends Partnership Mentoring Program Action Plan

    Data.gov (United States)

    Department of the Interior — This Action Plan has been prepared to support Recommendation 11 of the U.S. Fish and Wildlife Service Refuge System’s “Conserving the Future”. The plan outlines a...

  17. Wildlife disease and risk perception.

    Science.gov (United States)

    Hanisch-Kirkbride, Shauna L; Riley, Shawn J; Gore, Meredith L

    2013-10-01

    Risk perception has an important influence on wildlife management and is particularly relevant to issues that present health risks, such as those associated with wildlife disease management. Knowledge of risk perceptions is useful to wildlife health professionals in developing communication messages that enhance public understanding of wildlife disease risks and that aim to increase public support for disease management. To promote knowledge of public understanding of disease risks in the context of wildlife disease management, we used a self-administered questionnaire mailed to a stratified random sample (n = 901) across the continental United States to accomplish three objectives: 1) assess zoonotic disease risk perceptions; 2) identify sociodemographic and social psychologic factors underlying these risk perceptions; and 3) examine the relationship between risk perception and agreement with wildlife disease management practices. Diseases we assessed in the surveys were rabies, plague, and West Nile virus. Risk perception, as measured by an index consisting of severity, susceptibility, and dread, was greatest for rabies and West Nile virus disease (x = 2.62 and 2.59, respectively, on a scale of 1 to 4 and least for plague (x = 2.39). The four most important variables associated with disease risk perception were gender, education, prior exposure to the disease, and concern for health effects. We found that stronger risk perception was associated with greater agreement with wildlife disease management. We found particular concern for the vulnerability of wildlife to zoonotic disease and for protection of wildlife health, indicating that stakeholders may be receptive to messages emphasizing the potential harm to wildlife from disease and to messages promoting One Health (i.e., those that emphasize the interdependence of human, domestic animal, wildlife, and ecosystem health).

  18. Book review: Foundations of wildlife diseases

    Science.gov (United States)

    van Riper, Charles

    2016-01-01

    A new textbook for practitioners and students of wildlife disease is available. Rick Botzler and Richard Brown have provided an excellent addition to the wildlife disease literature with Foundations of Wildlife Diseases. It has been 8 years since the last major wildlife disease book (Wobeser 2006), and over 40 years since the first major wildlife disease compilation (Page 1975), an edited summary of the 3rd International Wildlife Disease meeting in Munich, Germany. Many people interested in wildlife diseases have waited eagerly for this book, and they will not be disappointed.Book information: Foundations of Wildlife Diseases. By Richard G. Botzler and Richard N. Brown. University of California Press, Oakland, California, USA. 2014. 429 pp., viii preface material. ISBN: 9780520276093. 

  19. Evaluation of carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 1 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity

  20. Wildlife in the Matrix: Spatio-Temporal Patterns of Herbivore Occurrence in Karnataka, India

    Science.gov (United States)

    Karanth, Krithi K.

    2016-01-01

    Wildlife reserves are becoming increasingly isolated from the surrounding human-dominated landscapes particularly in Asia. It is imperative to understand how species are distributed spatially and temporally in and outside reserves, and what factors influence their occurrence. This study surveyed 7500 km2 landscape surrounding five reserves in the Western Ghats to examine patterns of occurrence of five herbivores: elephant, gaur, sambar, chital, and pig. Species distributions are modeled spatio-temporally using an occupancy approach. Trained field teams conducted 3860 interview-based occupancy surveys in a 10-km buffer surrounding these five reserves in 2012. I found gaur and wild pig to be the least and most wide-ranging species, respectively. Elephant and chital exhibit seasonal differences in spatial distribution unlike the other three species. As predicted, distance to reserve, the reserve itself, and forest cover were associated with higher occupancy of all species, and higher densities of people negatively influenced occurrence of all species. Park management, species protection, and conflict mitigation efforts in this landscape need to incorporate temporal and spatial understanding of species distributions. All species are known crop raiders and conflict prone locations with resources (such as water and forage) have to be monitored and managed carefully. Wildlife reserves and adjacent areas are critical for long-term persistence and habitat use for all five herbivores and must be monitored to ensure wildlife can move freely. Such a large-scale approach to map and monitor species distributions can be adapted to other landscapes to identify and monitor critical habitats shared by people and wildlife.

  1. Seasonal movements of wildlife and livestock in a heterogenous pastoral landscape: Implications for coexistence and community based conservation

    Directory of Open Access Journals (Sweden)

    Peter Tyrrell

    2017-10-01

    Full Text Available Rangelands across the world are home to millions of pastoral people and vast wildlife populations, which create a complex landscape for conservation. Community based conservation has been used to promote human-wildlife coexistence on pastoral lands, protecting wildlife outside of official protected areas. With the spread of community based conservation within the rangelands there is a need for more information on successful management practices. This study provides an example of this in the South Rift, Kenya, where seasonal movements of pastoralists aid coexistence. We used Density Surface Modelling (DSM, a novel tool for conservation managers in the rangelands, to predict wildlife and livestock abundance across the landscape and seasons. Wildlife grazers, zebra (Equus burchelli and wildebeest (Connochaetes taurinus, follow expected metabolic patterns, feeding on short grass outside the conservation area in the wet season, before returning to the taller-lower quality grazing in the conservation areas during the drought. Browsing wildlife, impala (Aepyceros melampus and Grant’s gazelle (Nanger granti, move from open grassland and bushland areas into thicker, denser browse as the seasons progress towards the drought. Livestock, both shoats (Ovis aries, and Capra aegagrus hircus and cattle (Bos indicus, are managed by community grazing committees, who enforce a grazing plan that creates spatial–temporal separation between wildlife and livestock. They exploit the high-quality grazing in the livestock area during the wet season while conserving pasture in the conservation area, which is utilized only as forage is depleted. This ensures that wildlife has access to a diverse resource base across all seasons and potentially reduces competition, allowing for a diverse and abundant wildlife community to coexist with livestock. This highlights the importance of the presence and maintenance of spatial and temporal heterogeneity of forage resources

  2. Wildlife value orientations

    DEFF Research Database (Denmark)

    Gamborg, Christian; Jensen, Frank Søndergaard

    2016-01-01

    This article examined value orientations toward wildlife among the adult general Danish public in relation to age, sex, past and present residence, education, and income, using a U.S. survey instrument on Wildlife Value Orientations (WVO). The study used an Internet-based questionnaire sent...

  3. 75 FR 67095 - Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, Montana

    Science.gov (United States)

    2010-11-01

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-R-2010-N215; 60138-1261-6CCP-S3] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, Montana AGENCY: Fish and Wildlife Service, Interior (DOI). ACTION: Notice; extension of comment period. SUMMARY: We, the U.S. Fish...

  4. Wildlife-associated recreation trends in the United States: a technical document supporting the Forest Service 2010 RPA Assessment

    Science.gov (United States)

    Miranda H. Mockrin; Richard A. Aiken; Curtis H. Flather

    2012-01-01

    The Forest and Rangeland Renewable Resources Planning Act (RPA) of 1974 requires periodic assessments of the condition and trends of the Nation's renewable natural resources. In this report, we document recent and historical trends in hunting and wildlife watching to fulfill RPA requirements. Using data from the U.S. Department of the Interior, Fish and Wildlife...

  5. Comparing wildlife habitat and biodiversity across green roof type

    Energy Technology Data Exchange (ETDEWEB)

    Coffman, R.R. [Oklahoma Univ., Tulsa, OK (United States). Dept. of Landscape Architecture

    2007-07-01

    Green roofs represent restorative practices within human dominated ecosystems. They create habitat, increase local biodiversity, and restore ecosystem function. Cities are now promoting this technology as a part of mitigation for the loss of local habitat, making the green roof necessary in sustainable development. While most green roofs create some form of habitat for local and migratory fauna, some systems are designed to provide specific habitat for species of concern. Despite this, little is actually known about the wildlife communities inhabiting green roofs. Only a few studies have provided broad taxa descriptions across a range of green roof habitats, and none have attempted to measure the biodiversity across green roof class. Therefore, this study examined two different vegetated roof systems representative of North America. They were constructed under alternative priorities such as energy, stormwater and aesthetics. The wildlife community appears to be a result of the green roof's physical composition. Wildlife community composition and biodiversity is expected be different yet comparable between the two general types of green roofs, known as extensive and intensive. This study recorded the community composition found in the two classes of ecoroofs and assessed biodiversity and similarity at the community and group taxa levels of insects, spiders and birds. Renyi family of diversity indices were used to compare the communities. They were further described through indices and ratios such as Shannon's, Simpson's, Sorenson and Morsita's. In general, community biodiversity was found to be slightly higher in the intensive green roof than the extensive green roof. 26 refs., 4 tabs., 4 figs.

  6. Monitoring and mitigating measures to reduce potential impacts of oil and gas exploration and development on bears in the Inuvik region

    Energy Technology Data Exchange (ETDEWEB)

    Branigan, M. [Government of the Northwest Territories, Inuvik, NT (Canada). Dept. of Environment and Natural Resources

    2007-07-01

    The Inuvik Region consists of the Northwest Territories portion of the Inuvialuit Settlement Region and the Gwich'in Settlement Area. The range of grizzly bears, polar bears and black bears extends to different parts of the region. The potential impact of development depends on the season of the development and the species of bear found in the footprint. As such, monitoring and mitigation measures should take this into consideration. This presentation focused on the potential impacts and current practices to monitor and mitigate the impacts in the region. Mitigation measures currently used include: communication with stakeholders; waste management guidelines; use of wildlife monitors to identify key habitat and den sites and to deter bears; minimum flight altitudes; and safety training. Suggestions for additional mitigation measures were also presented. figs.

  7. International workshop on greenhouse gas mitigation technologies and measures: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    More than 150 countries are now Party to the United Nations Framework Convention on Climate Change (FCCC), which seeks to stabilize atmospheric concentrations of greenhouse gases at a level that would prevent dangerous human interference with the global climate system. Climate change country studies are a significant step for developing countries and countries with economies in transition to meet their national reporting commitments to the FCCC. These studies also provide the basis for preparation of National Climate Change Action Plans and implementation of technologies and practices which reduce greenhouse gas emissions or enhance carbon sinks. The broad goals of the workshop were to: (1) present results of country study mitigation assessments, (2) identify promising no-regrets greenhouse gas mitigation options in land-use and energy sectors, (3) share information on development of mitigation technologies and measures which contribute to improved National Climate Change Actions Plans, and (4) begin the process of synthesizing mitigation assessments for use by FCCC subsidiary bodies. The 59 papers are arranged into the following topical sections: (1) national mitigation assessments, technology priorities, and measures; (2) sector-specific mitigation assessment results, subdivided further into: energy sector; non-energy sector; renewable energy; energy efficiency in industry and buildings; transportation; electricity supply; forestry; and methane mitigation; (3) support for mitigation technologies and measures; and (4) activities implemented jointly. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  8. Wildlife and Tamarix

    Science.gov (United States)

    In this chapter, we present a synthesis of published literature and preliminary reports on the use of Tamarix by wildlife in riparian systems. We discuss how several groups of wildlife; specifically herpetofauna, birds, and mammals utilize or avoid Tamarix and discuss the impacts of methods for cont...

  9. 78 FR 8745 - Endangered and Threatened Wildlife and Plants; Designation of Critical Habitat for Tidewater Goby

    Science.gov (United States)

    2013-02-06

    ... the Tidewater Goby (Service 2005a; Recovery Plan). The basis for our action. Under the Act, we must... units in California (73 FR 5920, January 31, 2008). The lawsuit challenged the Service's failure to... to our Recovery Plan (Service 2005a), which is available from the Ventura Fish and Wildlife Office...

  10. 78 FR 13692 - Clarks River National Wildlife Refuge, KY; Final Comprehensive Conservation Plan/Land Protection...

    Science.gov (United States)

    2013-02-28

    ... recreation including non-motorized boating, walking, hiking, jogging, and bicycling; (7) research and... associated benefits. Authority This notice is published under the authority of the National Wildlife Refuge...

  11. 7 CFR 371.6 - Wildlife Services.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Wildlife Services. 371.6 Section 371.6 Agriculture..., DEPARTMENT OF AGRICULTURE ORGANIZATION, FUNCTIONS, AND DELEGATIONS OF AUTHORITY § 371.6 Wildlife Services. (a) General statement. Wildlife Services (WS) manages problems caused by wildlife. (b) Deputy Administrator of...

  12. A conservation planning approach to mitigate the impacts of leakage from protected area networks.

    Science.gov (United States)

    Bode, Michael; Tulloch, Ayesha I T; Mills, Morena; Venter, Oscar; Ando, Amy W

    2015-06-01

    Protected area networks are designed to restrict anthropogenic pressures in areas of high biodiversity. Resource users respond by seeking to replace some or all of the lost resources from locations elsewhere in the landscape. Protected area networks thereby perturb the pattern of human pressures by displacing extractive effort from within protected areas into the broader landscape, a process known as leakage. The negative effects of leakage on conservation outcomes have been empirically documented and modeled using homogeneous descriptions of conservation landscapes. Human resource use and biodiversity vary greatly in space, however, and a theory of leakage must describe how this heterogeneity affects the magnitude, pattern, and biodiversity impacts of leakage. We combined models of household utility, adaptive human foraging, and biodiversity conservation to provide a bioeconomic model of leakage that accounts for spatial heterogeneity. Leakage had strong and divergent impacts on the performance of protected area networks, undermining biodiversity benefits but mitigating the negative impacts on local resource users. When leakage was present, our model showed that poorly designed protected area networks resulted in a substantial net loss of biodiversity. However, the effects of leakage can be mitigated if they are incorporated ex-ante into the conservation planning process. If protected areas are coupled with nonreserve policy instruments such as market subsidies, our model shows that the trade-offs between biodiversity and human well-being can be further and more directly reduced. © 2014 Society for Conservation Biology.

  13. Emerging infectious diseases in free-ranging wildlife-Australian zoo based wildlife hospitals contribute to national surveillance.

    Directory of Open Access Journals (Sweden)

    Keren Cox-Witton

    Full Text Available Emerging infectious diseases are increasingly originating from wildlife. Many of these diseases have significant impacts on human health, domestic animal health, and biodiversity. Surveillance is the key to early detection of emerging diseases. A zoo based wildlife disease surveillance program developed in Australia incorporates disease information from free-ranging wildlife into the existing national wildlife health information system. This program uses a collaborative approach and provides a strong model for a disease surveillance program for free-ranging wildlife that enhances the national capacity for early detection of emerging diseases.

  14. 36 CFR 1002.2 - Wildlife protection.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Wildlife protection. 1002.2... RECREATION § 1002.2 Wildlife protection. (a) The following are prohibited: (1) The taking of wildlife. (2) The feeding, touching, teasing, frightening or intentional disturbing of wildlife nesting, breeding or...

  15. 40 CFR 230.32 - Other wildlife.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Other wildlife. 230.32 Section 230.32... Characteristics of the Aquatic Ecosystem § 230.32 Other wildlife. (a) Wildlife associated with aquatic ecosystems... cover, travel corridors, and preferred food sources for resident and transient wildlife species...

  16. 77 FR 18852 - Lee Metcalf National Wildlife Refuge, Stevensville, MT; Draft Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-03-28

    ... business hours at the Lee Metcalf National Wildlife Refuge headquarters located at 4567 Wildfowl Lane... habitats and has created and modified wetlands. Riverfront forest includes early succession tree species...

  17. Are Wildlife Films Really "Nature Documentaries"?

    Science.gov (United States)

    Bouse, Derek

    1998-01-01

    Examines origins of wildlife films. Outlines their tension between education and entertainment. Looks at how Disney codified wildlife films as a coherent genre by imposing conventionalized narrative frameworks upon them. Discusses factors influencing wildlife television in the 1990s. Concludes that wildlife films are a valid and distinct film and…

  18. 50 CFR 16.22 - Injurious wildlife permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Injurious wildlife permits. 16.22 Section 16.22 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND...

  19. VT Wildlife Linkage Habitat

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Wildlife Linkage Habitat Analysis uses landscape scale data to identify or predict the location of potentially significant wildlife linkage...

  20. 75 FR 59285 - Sonny Bono Salton Sea National Wildlife Refuge Complex (Sonny Bono Salton Sea National Wildlife...

    Science.gov (United States)

    2010-09-27

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-R-2010-N169; 80230-1265-0000-S3] Sonny Bono Salton Sea National Wildlife Refuge Complex (Sonny Bono Salton Sea National Wildlife Refuge and Coachella Valley National Wildlife Refuge), Imperial and Riverside Counties, CA Correction Notice...

  1. 50 CFR 17.4 - Pre-Act wildlife.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 2 2010-10-01 2010-10-01 false Pre-Act wildlife. 17.4 Section 17.4 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND...

  2. 50 CFR 70.9 - Wildlife species management.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Wildlife species management. 70.9 Section 70.9 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MANAGEMENT OF FISHERIES CONSERVATION AREAS NATIONAL FISH HATCHERIES § 70.9 Wildlife species...

  3. 50 CFR 14.51 - Inspection of wildlife.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Inspection of wildlife. 14.51 Section 14.51 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS...

  4. 50 CFR 31.12 - Sale of wildlife specimens.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Sale of wildlife specimens. 31.12 Section 31.12 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM WILDLIFE SPECIES MANAGEMENT Terms and Conditions of Wildlife...

  5. 75 FR 8107 - Bond Swamp National Wildlife Refuge, Bibb and Twiggs Counties, GA

    Science.gov (United States)

    2010-02-23

    ... impact. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the availability of our final comprehensive Conservation Plan (CCP) and finding of no significant impact (FONSI) for the environmental..., including upland mixed pine/hardwood, bottomland hardwood, and tupelo gum swamp forests. Creeks, beaver...

  6. Knowledge, risk perception and mitigation measures towards Ebola virus disease by potentially exposed bushmeat handlers in north-central Nigeria: Any critical gap?

    Science.gov (United States)

    Alhaji, N B; Yatswako, S; Oddoh, E Y

    2018-02-01

    The bushmeat industry has been a topic of increasing importance among public health officials for its influence on zoonotic diseases transmission, such as Ebola virus disease (EVD), a rare and severe infectious disease of humans and non-human primates. This survey assessed knowledge/awareness, risk perceptions and mitigation practices towards EVD among bushmeat handlers in north-central Nigeria. These characteristics are premise to level of preparedness against appropriate risk prevention and control. A questionnaire-based cross-sectional study was conducted between January and December 2015 on 395 bushmeat handlers. Descriptive and analytical statistical analyses were performed using Epi-Info 3.5.3 software, and p knowledge than the hunters. Handlers with tertiary education were more likely (OR 3.22; 95% CI: 1.56-6.67) to possess significant satisfactory knowledge/awareness about EVD. Also, vendors were more likely (OR 1.85; 95% CI: 1.01-3.42) to practice satisfactory mitigation measures than the hunters. Only handlers with tertiary education were more likely (OR 2.48; 95% CI: 1.26-4.89) to significantly practice satisfactory mitigation measures against EVD. Although most of the handlers possessed significant knowledge/awareness about EVD, few applied mitigation measures against its infection, which is the challenging gap. There is a need for collaborations between the public health, veterinary and wildlife authorities in the provision of health information to bushmeat handlers on better management of emerging and re-emerging zoonotic viral diseases of wildlife origin. © 2017 Blackwell Verlag GmbH.

  7. 75 FR 55599 - Little River National Wildlife Refuge, McCurtain County, OK; Revised Comprehensive Conservation...

    Science.gov (United States)

    2010-09-13

    ... meetings. You may obtain the schedule from the planning team leader or project leader (see addresses). You... public about the mission of the National Wildlife Refuge System and the role of Little River NWR in...

  8. Habitat Evaluation Procedures (HEP) Report : Oleson Tracts of the Tualatin River National Wildlife Refuge, 2001-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna; Smith, maureen; Schmidt, Peter

    2004-09-01

    Located in the northern Willamette River basin, Tualatin River National Wildlife Refuge (Refuge) was established in 1992 with an approved acquisition boundary to accommodate willing sellers with potentially restorable holdings within the Tualatin River floodplain. The Refuge's floodplain of seasonal and emergent wetlands, Oregon ash riparian hardwood, riparian shrub, coniferous forest, and Garry oak communities are representative of remnant plant communities historically common in the Willamette River valley and offer an opportunity to compensate for wildlife habitat losses associated with the Willamette River basin federal hydroelectric projects. The purchase of the Oleson Units as additions to the Refuge using Bonneville Power Administration (BPA) funds will partially mitigate for wildlife habitat and target species losses incurred as a result of construction and inundation activities at Dexter and Detroit Dams. Lands acquired for mitigation of Federal Columbia River Power System (FCRPS) impacts to wildlife are evaluated using the Habitat Evaluation Procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the FCRPS Loss Assessments and adopted as part of the Northwest Power and Conservation Council's Fish and Wildlife Program as a BPA obligation (NWPCC, 1994 and 2000). There are two basic management scenarios to consider for this evaluation: (1) Habitats can be managed without restoration activities to benefit wildlife populations, or (2) Habitats can be restored using a number of techniques to improve habitat values more quickly. Without restoration, upland and wetland areas may be periodically mowed and disced to prevent invasion of exotic vegetation, volunteer trees and shrubs may grow to expand forested areas, and cooperative farming may be employed to provide forage for migrating and wintering waterfowl. Abandoned cropland

  9. Regional economic analysis of current and proposed management alternatives for Rappahannock River Valley National Wildlife Refuge

    Science.gov (United States)

    Koontz, Lynne; Sexton, Natalie; Donovan, Ryan

    2009-01-01

    The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan. The Comprehensive Conservation Plan must describe the desired future conditions of a refuge and provide long-range guidance and management direction to achieve refuge purposes. The Rappahannock River Valley National Wildlife Refuge (refuge) is in the process of developing a range of management goals, objectives, and strategies for the Comprehensive Conservation Plan. The Comprehensive Conservation Plan for the refuge must contain an analysis of expected effects associated with current and proposed refuge management strategies. The purpose of this study was to assess the regional economic implications associated with draft Comprehensive Conservation Plan management strategies. Special interest groups and local residents often criticize a change in refuge management, especially if there is a perceived negative impact to the local economy. Having objective data on economic impacts may show that these fears are overstated. Quite often, the extent of economic benefits a refuge provides to a local community is not fully recognized, yet at the same time the effects of negative changes is overstated. Spending associated with refuge recreational activities, such as wildlife viewing and hunting, can generate considerable tourist activity for surrounding communities. Additionally, refuge personnel typically spend considerable amounts of money purchasing supplies in local stores, repairing equipment and purchasing fuel at the local service stations, and reside and spend their salaries in the local community. For refuge Comprehensive Conservation Plan planning, a regional economic assessment provides a means of estimating how current management (no action alternative) and proposed management activities (alternatives) could affect the local economy. This type of analysis provides two critical pieces of

  10. Science and Civics: Sustaining Wildlife

    Science.gov (United States)

    Council for Environmental Education, 2011

    2011-01-01

    Project WILD's new high school curriculum, "Science and Civics: Sustaining Wildlife", is designed to serve as a guide for involving students in environmental action projects aimed at benefitting the local wildlife found in a community. It involves young people in decisions affecting people, wildlife, and their shared habitat in the community. The…

  11. Great Basin wildlife disease concerns

    Science.gov (United States)

    Russ Mason

    2008-01-01

    In the Great Basin, wildlife diseases have always represented a significant challenge to wildlife managers, agricultural production, and human health and safety. One of the first priorities of the U.S. Department of Agriculture, Division of Fish and Wildlife Services was Congressionally directed action to eradicate vectors for zoonotic disease, particularly rabies, in...

  12. National Climate Change and Wildlife Science Center, Version 2.0

    Science.gov (United States)

    O'Malley, R.; Fort, E.; Hartke-O'Berg, N.; Varela-Acevedo, E.; Padgett, Holly A.

    2013-01-01

    The mission of the USGS's National Climate Change and Wildlife Science Center (NCCWSC) is to serve the scientific needs of managers of fish, wildlife, habitats, and ecosystems as they plan for a changing climate. DOI Climate Science Centers (CSCs) are management by NCCWSC and include this mission as a core responsibility, in line with the CSC mission to provide scientific support for climate-adaptation across a full range of natural and cultural resources. NCCWSC is a Science Center application designed in Drupal with the OMEGA theme. As a content management system, Drupal allows the science center to keep their website up-to-date with current publications, news, meetings and projects. OMEGA allows the site to be adaptive at different screen sizes and is developed on the 960 grid.

  13. Border Security Fencing and Wildlife: The End of the Transboundary Paradigm in Eurasia?

    Science.gov (United States)

    Linnell, John D. C.; Trouwborst, Arie; Boitani, Luigi; Kaczensky, Petra; Kusak, Josip; Skrbinsek, Tomaz; Buuveibaatar, Bayarbaatar; Bischof, Richard; Breitenmoser, Urs

    2016-01-01

    The ongoing refugee crisis in Europe has seen many countries rush to construct border security fencing to divert or control the flow of people. This follows a trend of border fence construction across Eurasia during the post-9/11 era. This development has gone largely unnoticed by conservation biologists during an era in which, ironically, transboundary cooperation has emerged as a conservation paradigm. These fences represent a major threat to wildlife because they can cause mortality, obstruct access to seasonally important resources, and reduce effective population size. We summarise the extent of the issue and propose concrete mitigation measures. PMID:27331878

  14. Border Security Fencing and Wildlife: The End of the Transboundary Paradigm in Eurasia?

    Science.gov (United States)

    Linnell, John D C; Trouwborst, Arie; Boitani, Luigi; Kaczensky, Petra; Huber, Djuro; Reljic, Slaven; Kusak, Josip; Majic, Aleksandra; Skrbinsek, Tomaz; Potocnik, Hubert; Hayward, Matt W; Milner-Gulland, E J; Buuveibaatar, Bayarbaatar; Olson, Kirk A; Badamjav, Lkhagvasuren; Bischof, Richard; Zuther, Steffen; Breitenmoser, Urs

    2016-06-01

    The ongoing refugee crisis in Europe has seen many countries rush to construct border security fencing to divert or control the flow of people. This follows a trend of border fence construction across Eurasia during the post-9/11 era. This development has gone largely unnoticed by conservation biologists during an era in which, ironically, transboundary cooperation has emerged as a conservation paradigm. These fences represent a major threat to wildlife because they can cause mortality, obstruct access to seasonally important resources, and reduce effective population size. We summarise the extent of the issue and propose concrete mitigation measures.

  15. Severe accident mitigation through containment design

    International Nuclear Information System (INIS)

    Bergeron, K.D.

    1990-01-01

    Recent U.S. Department of Energy plans to construct a Heavy Water Reactor for the production of defense nuclear materials have created a unique opportunity to explore ways to mitigate severe accident concerns in the design stage. Drawing on an extensive background in US-NRC-sponsored severe accident work, Sandia National Laboratories has been exploring a number of Heavy Water New Production Reactor (HW-NPR) containment design strategies that might mitigate the consequences of a core-melt accident without greatly impacting construction cost or reactor operations. Severe accident specialists have undertaken these assessments with the intent of providing the plant designers with some of the phenomenological advantages and disadvantages of various mitigation strategies. This paper will highlight some of the more interesting concepts and summarize the results obtained. (author). 9 refs., 2 tabs

  16. Severe accident mitigation through containment design

    International Nuclear Information System (INIS)

    Bergeron, K.D.

    1990-01-01

    Recent US Department of Energy plans to construct a Heavy Water Reactor for the production of defense nuclear materials have created a unique opportunity to explore ways to mitigate severe accident concerns in the design stage. Drawing on an extensive background in USNRC-sponsored severe accident work, Sandia National Laboratories has been exploring a number of Heavy Water New Production Reactor (HW-NPR) containment design strategies that might mitigate the consequences of a core-melt accident without greatly impacting construction cost or reactor operations. Severe accident specialists have undertaken these assessments with the intent of providing the plant designers with some of the phenomenological advantages and disadvantages of various mitigation strategies. This paper will highlight some of the more interesting concepts and summarize the results obtained. 9 refs., 2 tabs

  17. A Framework to Evaluate Wildlife Feeding in Research, Wildlife Management, Tourism and Recreation.

    Science.gov (United States)

    Dubois, Sara; Fraser, David

    2013-10-11

    Feeding of wildlife occurs in the context of research, wildlife management, tourism and in opportunistic ways. A review of examples shows that although feeding is often motivated by good intentions, it can lead to problems of public safety and conservation and be detrimental to the welfare of the animals. Examples from British Columbia illustrate the problems (nuisance animal activity, public safety risk) and consequences (culling, translocation) that often arise from uncontrolled feeding. Three features of wildlife feeding can be distinguished: the feasibility of control, the effects on conservation and the effects on animal welfare. An evaluative framework incorporating these three features was applied to examples of feeding from the literature. The cases of feeding for research and management purposes were generally found to be acceptable, while cases of feeding for tourism or opportunistic feeding were generally unacceptable. The framework should allow managers and policy-makers to distinguish acceptable from unacceptable forms of wildlife feeding as a basis for policy, public education and enforcement. Many harmful forms of wildlife feeding seem unlikely to change until they come to be seen as socially unacceptable.

  18. 76 FR 26751 - Prime Hook National Wildlife Refuge, Sussex County, DE; Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-05-09

    ... suggestions for the future management of Prime Hook NWR. We previously published a notice of intent on October... challenging to wildlife managers and biologists. Mosquitoes are a part of the natural environment and a food...

  19. 76 FR 53149 - North American Waterfowl Management Plan

    Science.gov (United States)

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  20. Mitigation effectiveness for improving nesting success of greater sage-grouse influenced by energy development

    Science.gov (United States)

    Kirol, Christopher P.; Sutphin, Andrew L.; Bond, Laura S.; Fuller, Mark R.; Maechtle, Thomas L.

    2015-01-01

    Sagebrush Artemisia spp. habitats being developed for oil and gas reserves are inhabited by sagebrush obligate species — including the greater sage-grouse Centrocercus urophasianus (sage-grouse) that is currently being considered for protection under the U.S. Endangered Species Act. Numerous studies suggest increasing oil and gas development may exacerbate species extinction risks. Therefore, there is a great need for effective on-site mitigation to reduce impacts to co-occurring wildlife such as sage-grouse. Nesting success is a primary factor in avian productivity and declines in nesting success are also thought to be an important contributor to population declines in sage-grouse. From 2008 to 2011 we monitored 296 nests of radio-marked female sage-grouse in a natural gas (NG) field in the Powder River Basin, Wyoming, USA, and compared nest survival in mitigated and non-mitigated development areas and relatively unaltered areas to determine if specific mitigation practices were enhancing nest survival. Nest survival was highest in relatively unaltered habitats followed by mitigated, and then non-mitigated NG areas. Reservoirs used for holding NG discharge water had the greatest support as having a direct relationship to nest survival. Within a 5-km2 area surrounding a nest, the probability of nest failure increased by about 15% for every 1.5 km increase in reservoir water edge. Reducing reservoirs was a mitigation focus and sage-grouse nesting in mitigated areas were exposed to almost half of the amount of water edge compared to those in non-mitigated areas. Further, we found that an increase in sagebrush cover was positively related to nest survival. Consequently, mitigation efforts focused on reducing reservoir construction and reducing surface disturbance, especially when the surface disturbance results in sagebrush removal, are important to enhancing sage-grouse nesting success.

  1. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Johnson, Gary E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.

  2. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Science.gov (United States)

    2012-05-30

    .... Water level manipulation is used to improve wetland habitats and invasive and non-native plant species... nonnative plants that are causing habitat losses and fragmentation would be controlled or eradicated...-led. A sanctuary area would be created for waterfowl on the east side of the Bowdoin National Wildlife...

  3. Tuberculosis in Tanzanian wildlife.

    Science.gov (United States)

    Cleaveland, S; Mlengeya, T; Kazwala, R R; Michel, A; Kaare, M T; Jones, S L; Eblate, E; Shirima, G M; Packer, C

    2005-04-01

    Bovine tuberculosis, caused by Mycobacterium bovis, is a pathogen of growing concern in free-ranging wildlife in Africa, but little is known about the disease in Tanzanian wildlife. Here, we report the infection status of Mycobacterium bovis in a range of wildlife species sampled from protected areas in northern Tanzania. M. bovis was isolated from 11.1% (2/18) migratory wildebeest (Connochaetes taurinus) and 11.1% (1/9) topi (Damaliscus lunatus) sampled systematically in 2000 during a meat cropping program in the Serengeti ecosystem, and from one wildebeest and one lesser kudu (Tragelaphus imberbis) killed by sport hunters adjacent to Tarangire National Park. A tuberculosis antibody enzyme immunoassay (EIA) was used to screen serum samples collected from 184 Serengeti lions (Panthera leo) and 19 lions from Ngorongoro Crater sampled between 1985 and 2000. Samples from 212 ungulates collected throughout the protected area network between 1998 and 2001 also were tested by EIA. Serological assays detected antibodies to M. bovis in 4% of Serengeti lions; one positive lion was sampled in 1984. Antibodies were detected in one of 17 (6%) buffalo (Syncerus caffer) in Tarangire and one of 41 (2%) wildebeest in the Serengeti. This study confirms for the first time the presence of bovine tuberculosis in wildlife of northern Tanzania, but further investigation is required to assess the impact on wildlife populations and the role of different wildlife species in maintenance and transmission.

  4. Mitigation by design

    International Nuclear Information System (INIS)

    Cairns, W.J.

    1992-01-01

    Mitigation or 'the act of bringing together' is not to be confused with applied architectural or landscape cosmetics to render development which has been predesigned in terms of engineering parameters to be more 'seemly' or 'attractive'. It is more profoundly an exercise in simultaneous engineering and environmental analysis in which the level of synthesis between the elements of construction and the elements of the physical environment is fundamental to the ultimate design success of projects. This text, having looked firstly at the nature of design and the characteristics of design processes and procedures, considers the linkages and interaction between design and the statutory land use planning system through which major development projects in Scotland are authorised. A case study of the development of the oil handling terminal at Flotta, Orkney, is included to demonstrate the implications of certain problems related to mitigation by design. (author)

  5. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    Science.gov (United States)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored

  6. A review of the possible impacts of wind farms on birds and other wildlife

    Energy Technology Data Exchange (ETDEWEB)

    Crockford, N J

    1992-02-03

    This review considers the local environmental impacts on wildlife, especially birds, of using wind turbine generators to harness wind energy of wind farms. It is hoped that this review will assist conservation bodies in commenting on planning applications for the sixty odd wind installations which have been contracted in the United Kingdom to date. Recommendations are made on further research which is needed to determine the effects of wind turbines on wildlife and on the ecological scope of the Environmental Impact Assessments for wind farms. Measures to minimise the ecological impact of the wind power industry in Britain are proposed. (U.K.)

  7. A review of the possible impacts of wind farms on birds and other wildlife

    International Nuclear Information System (INIS)

    Crockford, N.J.

    1992-01-01

    This review considers the local environmental impacts on wildlife, especially birds, of using wind turbine generators to harness wind energy of wind farms. It is hoped that this review will assist conservation bodies in commenting on planning applications for the sixty odd wind installations which have been contracted in the United Kingdom to date. Recommendations are made on further research which is needed to determine the effects of wind turbines on wildlife and on the ecological scope of the Environmental Impact Assessments for wind farms. Measures to minimise the ecological impact of the wind power industry in Britain are proposed. (U.K.)

  8. Understanding implications of consumer behavior for wildlife farming and sustainable wildlife trade.

    Science.gov (United States)

    Nuno, A; Blumenthal, J M; Austin, T J; Bothwell, J; Ebanks-Petrie, G; Godley, B J; Broderick, A C

    2018-04-01

    Unsustainable wildlife trade affects biodiversity and the livelihoods of communities dependent upon those resources. Wildlife farming has been proposed to promote sustainable trade, but characterizing markets and understanding consumer behavior remain neglected but essential steps in the design and evaluation of such operations. We used sea turtle trade in the Cayman Islands, where turtles have been farm raised for human consumption for almost 50 years, as a case study to explore consumer preferences toward wild-sourced (illegal) and farmed (legal) products and potential conservation implications. Combining methods innovatively (including indirect questioning and choice experiments), we conducted a nationwide trade assessment through in-person interviews from September to December 2014. Households were randomly selected using disproportionate stratified sampling, and responses were weighted based on district population size. We approached 597 individuals, of which 37 (6.2%) refused to participate. Although 30% of households had consumed turtle in the previous 12 months, the purchase and consumption of wild products was rare (e.g., 64-742 resident households consumed wild turtle meat [i.e., 0.3-3.5% of households] but represented a large threat to wild turtles in the area due to their reduced populations). Differences among groups of consumers were marked, as identified through choice experiments, and price and source of product played important roles in their decisions. Despite the long-term practice of farming turtles, 13.5% of consumers showed a strong preference for wild products, which demonstrates the limitations of wildlife farming as a single tool for sustainable wildlife trade. By using a combination of indirect questioning, choice experiments, and sales data to investigate demand for wildlife products, we obtained insights about consumer behavior that can be used to develop conservation-demand-focused initiatives. Lack of data from long-term social

  9. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

    2002-02-01

    We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

  10. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-04-01

    We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1999 through March 2000 are given.

  11. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  12. New Science Applications Within the U.S. National Tsunami Hazard Mitigation Program

    Science.gov (United States)

    Wilson, R. I.; Eble, M. C.; Forson, C. K.; Horrillo, J. J.; Nicolsky, D.

    2017-12-01

    The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is a collaborative State and Federal program which supports consistent and cost effective tsunami preparedness and mitigation activities at a community level. The NTHMP is developing a new five-year Strategic Plan based on the 2017 Tsunami Warning, Education, and Research Act as well as recommendations the 2017 NTHMP External Review Panel. Many NTHMP activities are based on the best available scientific methods through the NTHMP Mapping and Modeling Subcommittee (MMS). The primary activities for the MMS member States are to characterize significant tsunami sources, numerically model those sources, and create tsunami inundation maps for evacuation planning. This work remains a focus for many unmapped coastlines. With the lessons learned from the 2004 Indian Ocean and 2011 Tohoku Japan tsunamis, where both immediate risks and long-term recovery issues where recognized, the NTHMP MMS is expanding efforts into other areas that address community resilience. Tsunami evacuation modeling based on both pedestrian and vehicular modes of transportation are being developed by NTHMP States. Products include tools for the public to create personal evacuation maps. New tsunami response planning tools are being developed for both maritime and coastal communities. Maritime planning includes tsunami current-hazard maps for in-harbor and offshore response activities. Multi-tiered tsunami evacuation plans are being developed in some states to address local- versus distant-source tsunamis, as well as real-time evacuation plans, or "playbooks," for distant-source tsunamis forecasted to be less than the worst-case flood event. Products to assist community mitigation and recovery are being developed at a State level. Harbor Improvement Reports, which evaluate the impacts of currents, sediment, and debris on harbor infrastructure, include direct mitigation activities for Local Hazard Mitigation Plans. Building code updates in the

  13. 7 CFR 1410.22 - CRP conservation plan.

    Science.gov (United States)

    2010-01-01

    ... productive capability of the soil, improve water quality, protect wildlife or wetlands, protect a public well... plans and revisions of such plans shall be subject to the approval of CCC. (f) Mid-cover management... 7 Agriculture 10 2010-01-01 2010-01-01 false CRP conservation plan. 1410.22 Section 1410.22...

  14. 36 CFR 230.6 - Landowner forest stewardship plan.

    Science.gov (United States)

    2010-07-01

    ... manage soil, water, aesthetic qualities, recreation, timber, and fish and wildlife resources in a manner... sells or otherwise conveys land covered by a landowner forest stewardship plan, such plan shall remain... plan. 230.6 Section 230.6 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE...

  15. Priority mitigation measures in non-energy sector in Kazakstan

    Energy Technology Data Exchange (ETDEWEB)

    Mizina, S.V.; Pilifosova, O.V.; Gossen, E.F.

    1996-12-31

    Fulfilling the Commitments on UN FCCC through the U.S. Country Studies Program, Kazakstan has developed the national GHG Inventory, vulnerability and adaptation assessment and estimated the possibility of mitigation measures in certain sectors. Next step is developing National Climate Change Action Plan. That process includes such major steps as setting priorities in mitigation measures and technologies, their comprehensive evaluation, preparation implementation strategies, developing the procedure of incorporation of the National Action Plan into other development plans and programs. This paper presents programs and measures that can reduce GHG emissions in non-energy sector. Measures in land-use change and forestry, agriculture and coal mining are considered. Current situation in non-energy sector of Kazakstan is discussed. The amount of GHG emissions reduction and cost analysis presented in this paper was developed with the use of IPCC recommendations.

  16. Wildlife Co-management defined: The Beverly and Kaminuriak Caribou Management Board

    Directory of Open Access Journals (Sweden)

    Donald C. Thomas

    1991-10-01

    Full Text Available A comparison of indigenous and scientific forms of wildlife data gathering and conservation/management reveals similarities and differences. The two systems are needed to effectively manage wildlife in northern Canada, particularly migratory, trans-boundary species. The Beverly and Kaminuriak Caribou Management Board brought multi-jurisdictional caribou users and managers together to co-manage two large herds of caribou (Rangifer tarandus groenlan-dicus. The advisory Board's principal duties and responsibilities are communication and to maintain the two herds at population levels that will meet user needs. Goals, objectives, and principles are set out in a management plan. Board activities are structured in 15 action plans under major categories of communication, supply of caribou, use of caribou, and habitat. Board successes are attributed to use of the plan to guide actions; to the Chairmen and vice-Chairmen; to the quality of founding members and their continuity; to effective vehicles of communication such as a newspaper, radio, video, and community meetings; to a spirit of cooperation; and to high caribou numbers because of high productivity combined with poor accessibility. Problem areas include technical limitations, members' decreasing powers and increasing turnover, inadequate communication of Board objectives and activities within the communities, and accountability. Future challenges include the management of caribou shortages, obtaining better herd data, and the need for more intensive management as user populations grow.

  17. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Science.gov (United States)

    2010-05-11

    ...] Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic... draft Environmental Planning and Historic Preservation Compliance Costs policy and a draft Environmental Planning and Historic Preservation Mitigation policy. DATES: Comments must be received by June 10, 2010...

  18. 77 FR 18856 - Atchafalaya National Wildlife Refuge, LA; Final Comprehensive Conservation Plan and Finding of No...

    Science.gov (United States)

    2012-03-28

    ..., Recreation, and Tourism; Jena Band of Choctaw Indians; National Park Service; Audubon Society; Friends of the... wildlife viewing and photography opportunities by implementing blinds, a swamp trail boardwalk, and...

  19. Wildlife reserves, populations and hunting outcome with smart wildlife

    DEFF Research Database (Denmark)

    Jensen, Frank; Jacobsen, Jette Bredahl; Thorsen, Bo Jellesmark

    2014-01-01

    reach ambiguous results when comparing a situation with and without stress effects. A pure stress effect implies that the population level in a wildlife reserve increase and the population level in the hunting area decrease in optimum. However, this change in optimal population levels increase migration...... from the wildlife reserve to the hunting area in the social optimum. The total effect is, therefore, ambiguous. For the private optimum open-access is assumed and exactly the same results arise as in the social optimum when comparing a situation with and without stress effects....

  20. Blurred Boundaries in Wildlife Management Practices

    NARCIS (Netherlands)

    Boonman-Berson, S.H.

    2016-01-01

    Human-wildlife conflicts have been increasing at alarming rates over the last few decades. Wildlife management practices deal with preventing and disentangling these conflicts. However, which approach should be taken is widely disputed in research, policy, in-the-field-wildlife management and local

  1. Severe accident management. Prevention and Mitigation

    International Nuclear Information System (INIS)

    1992-01-01

    Effective planning for the management of severe accidents at nuclear power plants can produce both a reduction in the frequency of such accidents as well as the ability to mitigate their consequences if and when they should occur. This report provides an overview of accident management activities in OECD countries. It also presents the conclusions of a group of international experts regarding the development of accident management methods, the integration of accident management planning into reactor operations, and the benefits of accident management

  2. 50 CFR 14.52 - Clearance of imported wildlife.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Clearance of imported wildlife. 14.52 Section 14.52 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND...

  3. Airports offer unrealized potential for alternative energy production.

    Science.gov (United States)

    DeVault, Travis L; Belant, Jerrold L; Blackwell, Bradley F; Martin, James A; Schmidt, Jason A; Wes Burger, L; Patterson, James W

    2012-03-01

    Scaling up for alternative energy such as solar, wind, and biofuel raises a number of environmental issues, notably changes in land use and adverse effects on wildlife. Airports offer one of the few land uses where reductions in wildlife abundance and habitat quality are necessary and socially acceptable, due to risk of wildlife collisions with aircraft. There are several uncertainties and limitations to establishing alternative energy production at airports, such as ensuring these facilities do not create wildlife attractants or other hazards. However, with careful planning, locating alternative energy projects at airports could help mitigate many of the challenges currently facing policy makers, developers, and conservationists.

  4. Managing the livestock– Wildlife interface on rangelands

    Science.gov (United States)

    du Toit, Johan T.; Cross, Paul C.; Valeix, Marion

    2017-01-01

    On rangelands the livestock–wildlife interface is mostly characterized by management actions aimed at controlling problems associated with competition, disease, and depredation. Wildlife communities (especially the large vertebrate species) are typically incompatible with agricultural development because the opportunity costs of wildlife conservation are unaffordable except in arid and semi-arid regions. Ecological factors including the provision of supplementary food and water for livestock, together with the persecution of large predators, result in livestock replacing wildlife at biomass densities far exceeding those of indigenous ungulates. Diseases are difficult to eradicate from free-ranging wildlife populations and so veterinary controls usually focus on separating commercial livestock herds from wildlife. Persecution of large carnivores due to their depredation of livestock has caused the virtual eradication of apex predators from most rangelands. However, recent research points to a broad range of solutions to reduce conflict at the livestock–wildlife interface. Conserving wildlife bolsters the adaptive capacity of a rangeland by providing stakeholders with options for dealing with environmental change. This is contingent upon local communities being empowered to benefit directly from their wildlife resources within a management framework that integrates land-use sectors at the landscape scale. As rangelands undergo irreversible changes caused by species invasions and climate forcings, the future perspective favors a proactive shift in attitude towards the livestock–wildlife interface, from problem control to asset management.

  5. Changing patterns of wildlife diseases

    Science.gov (United States)

    McLean, R.G.

    2001-01-01

    The purpose of this paper was not to analyze the effects of global warming on wildlife disease patterns, but to serve as a springboard for future efforts to identify those wildlife diseases, including zoonotic diseases, that could be influenced the most by warming climates and to encourage the development of models to examine the potential effects. Hales et al. (1999) examined the relationship of the incidence of a vector-borne human disease, Dengue fever, and El Nino southern oscillations for South Pacific Island nations. The development of similar models on specific wildlife diseases which have environmental factors strongly associated with transmission would provide information and options for the future management of our wildlife resources.

  6. Work plan for transition of SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McClees, J.; Truitt, R.W.

    1994-01-01

    The purpose of this effort is to transfer operating and maintenance responsibility for the 241-SY-101 data acquisition and control system (DACS-1) from Los Alamos National Laboratory to Westinghouse Hanford Company. This work plan defines the tasks required for a successful turnover. It identifies DACS-1 transition, deliverables, responsible organizations and individuals, interfaces, cost, and schedule. The transition plan will discuss all required hardware, software, documentation, maintenance, operations, and training for use at Hanford Waste Tank 241-SY-101. The transfer of responsibilities for DACS-1 to WHC is contingent on final approval of applicable Acceptance for Beneficial Use documentation by Waste Tank Operations. The DACS-1 was designed to provide data monitoring, display, and storage for Tank 241-SY-101. The DACS-1 also provides alarm and control of all the hydrogen mitigation testing systems, as well as ancillary systems and equipment (HVAC, UPS, etc.) required to achieve safe and reliable operation of the testing systems in the tank

  7. Wildlife feeding in parks: methods for monitoring the effectiveness of educational interventions and wildlife food attraction behaviors

    Science.gov (United States)

    Marion, Jeffrey L.; Dvorak, Robert G.; Manning, Robert E.

    2008-01-01

    Opportunities to view and interact with wildlife are often an important part of high quality recreational experiences. Such interactions frequently include wildlife feeding, resulting in food-conditioned behaviors that may cause harm to both wildlife and visitors. This study developed and applied efficient protocols for simultaneously evaluating wildlife feeding-related behaviors of visitors and related foraging behaviors of chipmunks along a trail in Zion National Park. Unobtrusive observation protocols permitted an evaluation of educational messages delivered, and documentation of wildlife success in obtaining human food and the strength of their food attraction behavior. Significant improvements were documented for some targeted visitor behaviors and human food available to chipmunks, with minor differences between treatments. Replication of these protocols as part of a long-term monitoring program can help protected area managers evaluate and improve the efficacy of their interventions and monitor the strength of food attraction behavior in wildlife.

  8. Resource management plan for the Oak Ridge Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

  9. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    Science.gov (United States)

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  10. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    Science.gov (United States)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  11. A state-based national network for effective wildlife conservation

    Science.gov (United States)

    Meretsky, Vicky J.; Maguire, Lynn A.; Davis, Frank W.; Stoms, David M.; Scott, J. Michael; Figg, Dennis; Goble, Dale D.; Griffith, Brad; Henke, Scott E.; Vaughn, Jacqueline; Yaffee, Steven L.

    2012-01-01

    State wildlife conservation programs provide a strong foundation for biodiversity conservation in the United States, building on state wildlife action plans. However, states may miss the species that are at the most risk at rangewide scales, and threats such as novel diseases and climate change increasingly act at regional and national levels. Regional collaborations among states and their partners have had impressive successes, and several federal programs now incorporate state priorities. However, regional collaborations are uneven across the country, and no national counterpart exists to support efforts at that scale. A national conservation-support program could fill this gap and could work across the conservation community to identify large-scale conservation needs and support efforts to meet them. By providing important information-sharing and capacity-building services, such a program would advance collaborative conservation among the states and their partners, thus increasing both the effectiveness and the efficiency of conservation in the United States.

  12. Navy Radon Assessment and Mitigation Program: Work/quality assurance project plan screening phase

    International Nuclear Information System (INIS)

    1991-03-01

    In 1987, the military services of the United States were tasked to take appropriate action to establish an indoor radon assessment and mitigation program. As a result, the Naval Facilities Engineering Command (NAVFACENGCOM) was assigned the responsibility of identifying potential hazards to personnel from exposure to naturally occurring radon gas and prioritizing corrective actions and to coordinating these actions with the major claimants. NAVRAMP is based upon current US Environmental Protection Agency (EPA) guidelines. The program has been separated into four phases. The screening phase will concentrate on evaluating radon levels, based on statistical samples, in those buildings that have been determined to be at most at risk to elevated levels of radon, such as base housing, schools, day-care centers, hospitals, brigs, Base Officer Quarters, and Base Enlisted Quarters. During the assessment phase, every building that contains personnel for over 4 h/day will be evaluated. Mitigation work will be accomplished by Navy or Navy-contracted personnel. HAZWRAP services during the mitigation phase will consist of determining the extent of reduction in radon levels after the mitigation effort. 7 refs., 11 figs

  13. Wildlife trading: a conflictive relationship between human and fauna

    Directory of Open Access Journals (Sweden)

    Mónica Mojica Cárdenas

    2012-06-01

    Full Text Available This study re analyzes the participation of bioethical issues involved in the conflicts that come out from the relationship between humans and wildlife, as a consequence of the smuggling in Colombia. This proposal of theoretical approach characterizes the trade of wildlife in the country. It also describes and analyzes some of the problems associated with this activity. The results showed that there is a lack of knowledge regarding ecosystem elements as well as the existing legislation in this matter. This causes an inappropriate use of the biotic resources. This study also found that the trade of goods from wildlife derived resources can contribute to have a more sustainable environment and to improve the living conditions of the communities involved. To obtain these benefits, it is necessary to develop strategies where the different participants get together and come out with an educational and joint plan that targets preventive measures.It is further proposed that the humanity is directly responsible for safeguarding and the proper use of wildlife, thus, ethical responsibility and authority in this regard should be shared by the human groups affected, as wells as the governmental institutions. This attitude aims to harmonize the conflictive relationship between humans and the biological resources, since this may be the only way to maintain ecosystemic balance and thereby protect the human communities associated. This approach will lead to the preservation of diversity not only in biological but also in cultural terms. Finally, we propose that an ethical intervention of current and future professionals is required, so they can make joint decisions in which the non-human world is also considered.

  14. Promoting interactions between local climate change mitigation, sustainable energy development, and rural development policies in Lithuania

    International Nuclear Information System (INIS)

    Streimikiene, Dalia; Baležentis, Tomas; Kriščiukaitienė, Irena

    2012-01-01

    Lithuania has developed several important climate change mitigation policy documents however there are no attempts in Lithuania to develop local climate change mitigation policies or to decentralize climate change mitigation policy. Seeking to achieve harmonization and decentralization of climate change mitigation and energy policies in Lithuania the framework for local climate change mitigation strategy need to be developed taking into account requirements, targets and measures set in national climate change mitigation and energy policy documents. The paper will describe how national climate change mitigation and energy policies can be implemented via local energy and climate change mitigation plans. The aim of the paper is to analyze the climate change mitigation policy and its relationship with policies promoting sustainable energy development in Lithuania and to present a framework for local approaches to climate change mitigation in Lithuania, in the context of the existing national and supra-national energy, climate change, and rural development policies. - Highlights: ► The framework for local energy action plans is offered. ► The structural support possibilities are assessed with respect to the Lithuanian legal base. ► The proposals are given for further promotion of sustainable energy at the local level.

  15. 32 CFR 644.429 - Wildlife purposes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Wildlife purposes. 644.429 Section 644.429... ESTATE HANDBOOK Disposal Disposal of Fee-Owned Real Property and Easement Interests § 644.429 Wildlife... for wildlife conservation purposes by the agency of the state exercising administration over the...

  16. 36 CFR 2.2 - Wildlife protection.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Wildlife protection. 2.2... PROTECTION, PUBLIC USE AND RECREATION § 2.2 Wildlife protection. (a) The following are prohibited: (1) The taking of wildlife, except by authorized hunting and trapping activities conducted in accordance with...

  17. How do humans affect wildlife nematodes?

    Science.gov (United States)

    Weinstein, Sara B.; Lafferty, Kevin D.

    2015-01-01

    Human actions can affect wildlife and their nematode parasites. Species introductions and human-facilitated range expansions can create new host–parasite interactions. Novel hosts can introduce parasites and have the potential to both amplify and dilute nematode transmission. Furthermore, humans can alter existing nematode dynamics by changing host densities and the abiotic conditions that affect larval parasite survival. Human impacts on wildlife might impair parasites by reducing the abundance of their hosts; however, domestic animal production and complex life cycles can maintain transmission even when wildlife becomes rare. Although wildlife nematodes have many possible responses to human actions, understanding host and parasite natural history, and the mechanisms behind the changing disease dynamics might improve disease control in the few cases where nematode parasitism impacts wildlife.

  18. Greenhouse gas mitigation potential of biomass energy technologies in Vietnam using the long range energy alternative planning system model

    International Nuclear Information System (INIS)

    Kumar, Amit; Bhattacharya, S.C.; Pham, H.L.

    2003-01-01

    The greenhouse gas (GHG) mitigation potentials of number of selected Biomass Energy Technologies (BETs) have been assessed in Vietnam. These include Biomass Integrated Gasification Combined Cycle (BIGCC) based on wood and bagasse, direct combustion plants based on wood, co-firing power plants and Stirling engine based on wood and cooking stoves. Using the Long-range Energy Alternative Planning (LEAP) model, different scenarios were considered, namely the base case with no mitigation options, replacement of kerosene and liquefied petroleum gas (LPG) by biogas stove, substitution of gasoline by ethanol in transport sector, replacement of coal by wood as fuel in industrial boilers, electricity generation with biomass energy technologies and an integrated scenario including all the options together. Substitution of coal stoves by biogas stove has positive abatement cost, as the cost of wood in Vietnam is higher than coal. Replacement of kerosene and LPG cookstoves by biomass stove also has a positive abatement cost. Replacement of gasoline by ethanol can be realized after a few years, as at present the cost of ethanol is more than the cost of gasoline. The replacement of coal by biomass in industrial boiler is also not an attractive option as wood is more expensive than coal in Vietnam. The substitution of fossil fuel fired plants by packages of BETs has a negative abatement cost. This option, if implemented, would result in mitigation of 10.83 million tonnes (Mt) of CO 2 in 2010

  19. 50 CFR 31.1 - Determination of surplus wildlife populations.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Determination of surplus wildlife populations. 31.1 Section 31.1 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM WILDLIFE SPECIES MANAGEMENT Surplus...

  20. Adverse outcome pathway and risks of anticoagulant rodenticides to predatory wildlife

    Science.gov (United States)

    Rattner, Barnett A.; Lazarus, Rebecca S.; Elliott, John E.; Shore, Richard F.; van den Brink, Nico

    2014-01-01

    Despite a long history of successful use, routine application of some anticoagulant rodenticides (ARs) may be at a crossroad due to new regulatory guidelines intended to mitigate risk. An adverse outcome pathway for ARs was developed to identify information gaps and end points to assess the effectiveness of regulations. This framework describes chemical properties of ARs, established macromolecular interactions by inhibition of vitamin K epoxide reductase, cellular responses including altered clotting factor processing and coagulopathy, organ level effects such as hemorrhage, organism responses with linkages to reduced fitness and mortality, and potential consequences to predator populations. Risk assessments have led to restrictions affecting use of some second-generation ARs (SGARs) in North America. While the European regulatory community highlighted significant or unacceptable risk of ARs to nontarget wildlife, use of SGARs in most EU member states remains authorized due to public health concerns and the absence of safe alternatives. For purposes of conservation and restoration of island habitats, SGARs remain a mainstay for eradication of invasive species. There are significant data gaps related to exposure pathways, comparative species sensitivity, consequences of sublethal effects, potential hazards of greater AR residues in genetically resistant prey, effects of low-level exposure to multiple rodenticides, and quantitative data on the magnitude of nontarget wildlife mortality.

  1. Ranch business planning and resource monitoring for rangeland sustainability

    Science.gov (United States)

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  2. Patterns and Composition of Road-Killed Wildlife in Northwest Argentina

    Science.gov (United States)

    Cuyckens, Griet An Erica; Mochi, Lucía Sol; Vallejos, María; Perovic, Pablo Gastón; Biganzoli, Fernando

    2016-11-01

    Roads have important effects on wildlife, such as natural habitat fragmentation and degradation and direct killing of fauna, which leads to reductions in wildlife population size. We focused on a principal road in Northwest Argentina to test for the effect of seasonality and landscape features on the composition of road-killed wildlife. We conducted regularly scheduled road trips during the dry and wet seasons. We recorded the presence or absence of a vegetation curtain or hedge along the road. We measured land use by remote sensing in a 500 m buffer along the road. We compared the abundance of animals killed between seasons (dry and wet) for different taxonomic groups (mammals, birds and reptiles) and for different origins (domestic and native). We built linear mixed models to test the effect of landscape features on the abundance of killed animals. Two hundred and ninety-three individuals were killed, belonging to 35 species; 75.8 % were native and 24.2 % domestic species. The majority of animals killed were mid-sized mammals. More animals were killed during the dry season. The most important factors to explain the wildlife road-killing were the season and the proportion of agricultural landscape. The composition of the killed animals changed with the season. The proportion of agricultural landscape incremented the number of killed birds and mammals during both seasons, without affecting reptiles. The ratio of wild to domestic animals killed was dependent on the season. This study sets a precedent as the first in road ecology in Northwest Argentina and should be taken into account for road planning and regulation.

  3. Wildlife and wildlife habitat restoration and compensation in the event of an oil spill in the Beaufort Sea

    International Nuclear Information System (INIS)

    Lawrence, M.J.; Davies, S.L.

    1993-01-01

    A procedure for estimating the potential costs of a worst-case scenario for a Beaufort Sea oil spill has been developed by applying assessments of the vulnerability and sensitivity of valued wildlife species to oil, an evaluation of practicability of restoration options, and estimates of the costs of implementing specific measures to aid in the restoration of wildlife species and their habitat. The procedure was developed and tested using valued wildlife species and elements of selected worst-case oil spill scenarios. Proponent use of the procedure in a project-specific application will demand certain information prerequisites, including a project-specific oil spill scenario, an assessment of the potential impacts on wildlife and habitat, and the predicted effectiveness of countermeasures and cleanup. Total compensation costs that account for potential loss of harvest of wildlife in the event of a worst-case oil spill were estimated to be nearly $12.2 million. Recommendations were also made with respect to wildlife and wildlife habitat restoration, as well as with respect to compensation issues. 103 refs., 4 figs., 4 tabs

  4. 76 FR 14042 - San Luis Valley National Wildlife Refuge Complex, Alamosa, CO; Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-03-15

    ... nesting, migrating, and wintering birds, including grebes, herons, ibis, ducks, geese, hawks, eagles... movement of water, is a complex issue that needs to be addressed. The Service is also proposing to study... sustainability of America's land, water, wildlife and cultural resources. The study would analyze the potential...

  5. 75 FR 63502 - Sonny Bono Salton Sea National Wildlife Refuge Complex (Sonny Bono Salton Sea National Wildlife...

    Science.gov (United States)

    2010-10-15

    ... wildlife, plant, and habitat conservation, while providing for wildlife-dependent recreation opportunities... established as a 32,766-acre sanctuary and breeding ground for birds and other wildlife in 1930 (Executive... Migratory Bird Conservation Act (16 U.S.C. 715d), ``for use as an inviolate sanctuary, or for any other...

  6. 50 CFR 36.32 - Taking of fish and wildlife.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Taking of fish and wildlife. 36.32 Section 36.32 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES Other Refuge Uses § 36.32...

  7. [Book review] A passion for wildlife: The history of the Canadian Wildlife Service

    Science.gov (United States)

    Robbins, Chandler S.

    2004-01-01

    This intimate historical account was contracted in 1996 by Environment Canada to naturalist-writer Burnett, who interviewed more than 120 present and former Canadian Wildlife Service (CWS) employees of the 1947–1997 period. Each of the 10 chapters addresses a major topic, followed by a brief account of the chief activities of a five-year period. For example, chapter 1 is on “The Genesis of the Canadian Wildlife Service,” followed by highlights of the 1947–1952 period: “Setting the Wildlife Agenda.” The other nine chapters cover the history of enforcement; work with birds, mammals, and fish; habitats; education; toxicology; endangered species; and legislation.

  8. Socioeconomic issues for the Bear River Watershed Conservation Land Area Protection Plan

    Science.gov (United States)

    Thomas, Catherine Cullinane; Huber, Christopher; Gascoigne, William; Koontz, Lynne

    2012-01-01

    The Bear River Watershed Conservation Area is located in the Bear River Watershed, a vast basin covering fourteen counties across three states. Located in Wyoming, Utah, and Idaho, the watershed spans roughly 7,500 squares miles: 1,500 squares miles in Wyoming; 2,700 squares miles in Idaho; and 3,300 squares miles in Utah (Utah Division of Water Resources, 2004). Three National Wildlife Refuges are currently contained within the boundary of the BRWCA: the Bear River Migratory Bird Refuge in Utah, the Bear Lake National Wildlife Refuge in Idaho, and the Cokeville Meadows National Wildlife Refuge in Wyoming. In 2010, the U.S. Fish and Wildlife Service conducted a Preliminary Project Proposal and identified the Bear River Watershed Conservation Area as having high-value wildlife habitat. This finding initiated the Land Protection Planning process, which is used by the U.S. Fish and Wildlife Service to study land conservation opportunities including adding lands to the National Wildlife Refuge System. The U.S. Fish and Wildlife Service proposes to include part of the Bear River Watershed Conservation Area in the Refuge System by acquiring up to 920,000 acres of conservation easements from willing landowners to maintain landscape integrity and habitat connectivity in the region. The analysis described in this report provides a profile of the social and economic conditions in the Bear River Watershed Conservation Area and addresses social and economic questions and concerns raised during public involvement in the Land Protection Planning process.

  9. Quantification of Hungry Horse Reservoir Water Levels Needed to Maintain or Enhance Reservoir Fisheries; Methods and Data, 1983-1987 Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    May, Bruce; Michael, Gary; Wachsmuth, John (Montana Department of Fish, Wildlife and Parks, Kalispell, MT)

    1988-06-01

    The Hungry Horse Reservoir study is part of the Northwest Power Planning Council's resident fish and wildlife plan. The plan is responsible for mitigating damages to the fish and wildlife resources caused by hydroelectric development in the Columbia River Basin. The major goal of our study is to quantify seasonal water levels needed to maintain or enhance the reservoir fishery. This study began in May, 1983, and the initial phase will be completed July, 1988. This report summarizes limnological, fish abundance, fish distribution and fish food habits data collected from 1983 to 1988. The effect of reservoir operation upon fish habitat, fish food organisms and fish growth is discussed. 71 refs., 36 figs., 46 tabs.

  10. Common–interest community agreements on private lands provide opportunity and scale for wildlife management

    Directory of Open Access Journals (Sweden)

    Powell, L. A.

    2012-01-01

    Full Text Available Private lands are critical to conservation planning for wildlife, worldwide. Agriculture subsidies, tax incentives, and conservation easements have been successfully used as tools to convert cropland to native vegetation. However, uncertain economies threaten the sustainability of these incentives. The wildlife management profession is in need of innovative models that support effective management of populations. I argue that biologists should consider the option of facilitating the development of private reserves to reduce the dependence of conservation on public investment. Private reserves can be enhanced by creating common–interest communities, which reduce the problem posed by limited size of individual properties. Cross–property agreements between landowners can provide economic incentives through forms of ecotourism, energy production, and/or enhanced agricultural production. I share two case studies that demonstrate how cross–property agreements may be beneficial to landowner’s finances and conservation of diverse wildlife communities, as well as providing an efficient structure for NGOs and management agencies to engage and support landowners.

  11. Wildlife health investigations: needs, challenges and recommendations

    Science.gov (United States)

    2013-01-01

    In a fast changing world with growing concerns about biodiversity loss and an increasing number of animal and human diseases emerging from wildlife, the need for effective wildlife health investigations including both surveillance and research is now widely recognized. However, procedures applicable to and knowledge acquired from studies related to domestic animal and human health can be on partly extrapolated to wildlife. This article identifies requirements and challenges inherent in wildlife health investigations, reviews important definitions and novel health investigation methods, and proposes tools and strategies for effective wildlife health surveillance programs. Impediments to wildlife health investigations are largely related to zoological, behavioral and ecological characteristics of wildlife populations and to limited access to investigation materials. These concerns should not be viewed as insurmountable but it is imperative that they are considered in study design, data analysis and result interpretation. It is particularly crucial to remember that health surveillance does not begin in the laboratory but in the fields. In this context, participatory approaches and mutual respect are essential. Furthermore, interdisciplinarity and open minds are necessary because a wide range of tools and knowledge from different fields need to be integrated in wildlife health surveillance and research. The identification of factors contributing to disease emergence requires the comparison of health and ecological data over time and among geographical regions. Finally, there is a need for the development and validation of diagnostic tests for wildlife species and for data on free-ranging population densities. Training of health professionals in wildlife diseases should also be improved. Overall, the article particularly emphasizes five needs of wildlife health investigations: communication and collaboration; use of synergies and triangulation approaches; investments

  12. Costs of radon diagnostics and mitigation in school building

    International Nuclear Information System (INIS)

    Leovic, K.W.; Rector, H.; Nagda, N.

    1992-01-01

    To determine the costs of radon diagnostics and active soil depressurization (ASD) system installation in schools, seven radon mitigators with extensive experience in school buildings were surveyed. The cost data were determined by providing the mitigators with two scenarios of open-quotes typicalclose quotes school buildings with elevated radon levels. The questionnaire in schools: (1) Review Construction Plans, (2) Conduct Diagnostic Measurements, (3) Design Mitigation System, (4) Purchase ASD Material, and (5) Install and Checkout ASD System. Based on the results of this survey, it is estimated that the average cost of ASD diagnostics and mitigation in a typical school would be roughly $0.50 per ft 2 . However, these costs would be higher in schools with extensive subslab walls, very poor PFE, and lower in simple schools with very good PFE and no subslab barriers to communication. The variations in costs provided by the mitigators are primarily due to the influences of (1) experience and practices of the mitigation companies, (2) ASD system requirements as perceived by the respondents, and (3) the degree of involvement by the school system in the process

  13. WICCI Wildlife Working Group Report

    Science.gov (United States)

    LeDee, Olivia E.; Hagell, Suzanne; Martin, K.; McFarland, David; Meyer, Michael; Paulios, Andy; Ribic, Christine A.; Sample, D.; Van Deelen, Timothy R.

    2013-01-01

    Wisconsin is world-renowned for its diversity of ecological landscapes and wildlife populations.  The northern forests, southern prairies, and interior and coastal wetlands of the state are home to more than 500 terrestrial animal species.  These animals supply the Wisconsin public with aesthetic, cultural, and economic benefits; our identity and economy are intertwined with these natural resources.  Climate change is altering the behavior, distribution, development, reproduction, and survival of these animal populations.  In turn, these changes will alter the aesthetic, cultural, and economic benefits we receive from them.  The focus of the Wildlife Working Group is to document past and current impacts, anticipate changes in wildlife distribution and abundance, and develop adaptation strategies to maintain the vitality and diversity of Wisconsin's wildlife populations.

  14. Coal mining at Lunckefjell, Svalbard. Environmental impact assessment: landscape, vegetation, wildlife and geology; Kulldrift i Lunckefjell paa Svalbard. Konsekvensutredning for tema landskap, vegetasjon og planteliv, dyreliv og geologiske forekomster/fossiler

    Energy Technology Data Exchange (ETDEWEB)

    Hagen, D.; Eide, N.E.; Erikstad, L.; Coulsen, S.; Andersen, R.

    2010-08-15

    pollution of natural systems below the glacier is assessed to be minor. Transport over the glacier in wintertime can have an effect on wildlife. Planned transport frequency will possibly not cause negative effects at the population level. It is however important to limit and concentrate the transport as much as possible. As long as all motorized traffic is restricted to frozen and snow-covered periods the mining operation and transport over land will have no effects on vegetation and flora in the area. The report indicates mitigations linked to all phases of the planned mining operation. (Author)

  15. NORTHWOODS Wildlife Habitat Data Base

    Science.gov (United States)

    Mark D. Nelson; Janine M. Benyus; Richard R. Buech

    1992-01-01

    Wildlife habitat data from seven Great Lakes National Forests were combined into a wildlife-habitat matrix named NORTHWOODS. Several electronic file formats of NORTHWOODS data base and documentation are available on floppy disks for microcomputers.

  16. Evaluating wildlife-cattle contact rates to improve the understanding of dynamics of bovine tuberculosis transmission in Michigan, USA.

    Science.gov (United States)

    Lavelle, Michael J; Kay, Shannon L; Pepin, Kim M; Grear, Daniel A; Campa, Henry; VerCauteren, Kurt C

    2016-12-01

    Direct and indirect contacts among individuals drive transmission of infectious disease. When multiple interacting species are susceptible to the same pathogen, risk assessment must include all potential host species. Bovine tuberculosis (bTB) is an example of a disease that can be transmitted among several wildlife species and to cattle, although the potential role of several wildlife species in spillback to cattle remains unclear. To better understand the complex network of contacts and factors driving disease transmission, we fitted proximity logger collars to beef and dairy cattle (n=37), white-tailed deer (Odocoileus virginianus; n=29), raccoon (Procyon lotor; n=53), and Virginia opossum (Didelphis virginiana; n=79) for 16 months in Michigan's Lower Peninsula, USA. We determined inter- and intra-species direct and indirect contact rates. Data on indirect contact was calculated when collared animals visited stationary proximity loggers placed at cattle feed and water resources. Most contact between wildlife species and cattle was indirect, with the highest contact rates occurring between raccoons and cattle during summer and fall. Nearly all visits (>99%) to cattle feed and water sources were by cattle, whereas visitation to stored cattle feed was dominated by deer and raccoon (46% and 38%, respectively). Our results suggest that indirect contact resulting from wildlife species visiting cattle-related resources could pose a risk of disease transmission to cattle and deserves continued attention with active mitigation. Published by Elsevier B.V.

  17. A review of wildlife ecotourism in Manaus, Brazil

    Directory of Open Access Journals (Sweden)

    Neil D'Cruze

    2017-10-01

    Full Text Available The Amazon’s ability to draw tourists is thought to be strongly associated with the opportunity to have sight of and interact with iconic wild animals. Tourism leaders are calling for the private and public sectors to develop wildlife focused ecotourism in this region. However, specific information regarding current practice and their impact on wildlife is lacking. Although wildlife ecotourism here remains in its relative infancy, our study demonstrates that a wide variety of wildlife-focused activities are already being promoted and provided to tourists who visit the city of Manaus in Brazil. Issues of potential wildlife conservation and animal welfare concern include wildlife-baiting, swim-with free-ranging pink river dolphin activity, the use of captive wild animals as photo props and the sale of wildlife body parts as souvenirs. We found that tour guides actively promoted these activities on 77% of excursions attended, which involved a range of different wild animals, representing at least 10 different species from three different taxonomic classes. From a legal perspective, despite the potential risks imposed to wildlife and tourist well-being, there are still no specific laws regulating feeding, touching and swimming with pink river dolphins in Brazil. However, the illegality of advertising and providing direct physical contact wildlife ‘photo prop’ tourism is demonstrated by enforcement action taken by wildlife authorities during our study. We suggest that tourist focused human behavior change initiatives should become a critical component of a wider holistic approach to effectively balance wildlife protection goals and any expansion of wildlife ecotourism in the Amazon.

  18. Mechanistic understanding of human-wildlife conflict through a novel application of dynamic occupancy models.

    Science.gov (United States)

    Goswami, Varun R; Medhi, Kamal; Nichols, James D; Oli, Madan K

    2015-08-01

    Crop and livestock depredation by wildlife is a primary driver of human-wildlife conflict, a problem that threatens the coexistence of people and wildlife globally. Understanding mechanisms that underlie depredation patterns holds the key to mitigating conflicts across time and space. However, most studies do not consider imperfect detection and reporting of conflicts, which may lead to incorrect inference regarding its spatiotemporal drivers. We applied dynamic occupancy models to elephant crop depredation data from India between 2005 and 2011 to estimate crop depredation occurrence and model its underlying dynamics as a function of spatiotemporal covariates while accounting for imperfect detection of conflicts. The probability of detecting conflicts was consistently year). The probability of crop depredation occurrence ranged from 0.29 (SE 0.09) to 0.96 (SE 0.04). The probability that sites raided by elephants in primary period t would not be raided in primary period t + 1 varied with elevation gradient in different seasons and was influenced negatively by mean rainfall and village density and positively by distance to forests. Negative effects of rainfall variation and distance to forests best explained variation in the probability that sites not raided by elephants in primary period t would be raided in primary period t + 1. With our novel application of occupancy models, we teased apart the spatiotemporal drivers of conflicts from factors that influence how they are observed, thereby allowing more reliable inference on mechanisms underlying observed conflict patterns. We found that factors associated with increased crop accessibility and availability (e.g., distance to forests and rainfall patterns) were key drivers of elephant crop depredation dynamics. Such an understanding is essential for rigorous prediction of future conflicts, a critical requirement for effective conflict management in the context of increasing human-wildlife interactions. © 2015

  19. 77 FR 64541 - Trinity River National Wildlife Refuge, Liberty County, TX; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2012-10-22

    ...) (40 CFR 1506.6(b)) requirements. We completed a thorough analysis of impacts on the human environment... foundation for the CCP. Background The National Wildlife Refuge System Administration Act of 1966 (16 U.S.C... these, we developed and evaluated the following alternatives. C--Optimal habitat A--No-Action B...

  20. 77 FR 13139 - Malheur National Wildlife Refuge, Harney County, OR; Draft Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-03-05

    ... migratory birds and other wild life * * *'' and ``* * * for use as an inviolate sanctuary, or for any other... on meadow habitats. Plant litter, which becomes detrimental to some wildlife species needs over time..., which include nearly all areas not on the main roads, would remain closed in order to provide sanctuary...

  1. A Global Mitigation Hierarchy for Nature Conservation

    Science.gov (United States)

    Bull, Joseph W; Addison, Prue F E; Burgass, Michael J; Gianuca, Dimas; Gorham, Taylor M; Jacob, Céline; Watson, James E M; Wilcox, Chris; Milner-Gulland, E J

    2018-01-01

    Abstract Efforts to conserve biodiversity comprise a patchwork of international goals, national-level plans, and local interventions that, overall, are failing. We discuss the potential utility of applying the mitigation hierarchy, widely used during economic development activities, to all negative human impacts on biodiversity. Evaluating all biodiversity losses and gains through the mitigation hierarchy could help prioritize consideration of conservation goals and drive the empirical evaluation of conservation investments through the explicit consideration of counterfactual trends and ecosystem dynamics across scales. We explore the challenges in using this framework to achieve global conservation goals, including operationalization and monitoring and compliance, and we discuss solutions and research priorities. The mitigation hierarchy's conceptual power and ability to clarify thinking could provide the step change needed to integrate the multiple elements of conservation goals and interventions in order to achieve successful biodiversity outcomes. PMID:29731513

  2. Retrospective analysis of the epidemiologic literature, 1990–2015, on wildlife-associated diseases from the Republic of Korea

    Science.gov (United States)

    Hwang, Jusun; Lee, Kyunglee; Kim, Young-Jun; Sleeman, Jonathan M.; Lee, Hang

    2017-01-01

    , would be important. This type of review can provide useful information for countries or regions planning or implementing national wildlife health programs.

  3. Jaguars on the move: modeling movement to mitigate fragmentation from road expansion in the Mayan Forests

    DEFF Research Database (Denmark)

    Colchero, Fernando; Conde, Dalia Amor; Manterola, Carlos

    2011-01-01

    Road-induced habitat fragmentation is one of the greatest threats to large carnivores. Wildlife passes have been used to reduce fragmentation by mitigating the effects of roads as barriers to animal movement. However, direct observations of animals crossing roads are extremely rare and thus......-telemetry and GPS data to infer the movement behavior of jaguars Panthera onca as a response to vegetation, roads and human population density in the Mayan Forests of Mexico and Guatemala. We used the results of the model to simulate jaguars moving along a road that bisects the major reserve system in the area....... The aim of the simulations was to identify suitable locations for wildlife passes. We found that jaguars move preferentially to undisturbed forests and that females avoid moving close to roads and to areas with even low levels of human occupation. Males also avoid roads, but to a lesser degree, and appear...

  4. Anticoagulant rodenticides and wildlife: Concluding remarks

    Science.gov (United States)

    van den Brink, Nico W.; Elliott, John E.; Shore, Richard F.; Rattner, Barnett A.

    2018-01-01

    and bait placement. Another key factor that affects the interaction between ARs and wildlife is the development of resistance in target species. The development of resistance has resulted in higher use of SGARs, thereby increasing the potential of non-target and secondary exposure. AR use has increasingly become more strictly regulated, increasing the need for alternatives. Alternatives are available, including non-anticoagulant rodenticides, but these may also pose significant risk to environmental organisms, humans and pets. There are also various mitigation measures that can be implemented when using ARs, including bait protection, pulsed baiting at the onset of infestation, restricting use by non-professionals, and avoiding use in areas of high non-target density. Reduction in secondary exposure may result from e.g. non-chemical control, habitat management, and, in agricultural habitats, the use of lure crops and supplemental feeding. Such Integrated Pest Management (IPM) may not only reduce non-target exposure but also benefit resistance management. Barriers to adopt IPM approaches however, include the perception that they do not work or too slowly and are more laborious, expensive and time consuming. It is therefore important that the expectations of stakeholders are considered and managed. Nevertheless, further development of alternatives and IPM measures is essential, so the key research priority related to rodent control may ultimately be to address the lack of scientific assessment of the effectiveness of both specific AR mitigation measures and of IPM approaches to rodent control.

  5. Public Attitudes to the Use of Wildlife by Aboriginal Australians: Marketing of Wildlife and its Conservation

    OpenAIRE

    Tisdell, Clement A.; Swarna Nantha, Hemanath

    2005-01-01

    Attitudes of a sample of the Australian public towards the subsistence use of wildlife by indigenous Australians and whether or not indigenous Australians should be allowed to sell wildlife and wildlife products is examined. It has been suggested that allowing such possibilities would provide economic incentives for nature conservation among local people. We explore whether those sampled believe that indigenous Australians should do more than other groups and institutions to conserve Australi...

  6. 36 CFR 241.2 - Cooperation in wildlife management.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Cooperation in wildlife... FISH AND WILDLIFE General Provisions § 241.2 Cooperation in wildlife management. The Chief of the... which national forests or portions thereof may be devoted to wildlife protection in combination with...

  7. 33 CFR 332.3 - General compensatory mitigation requirements.

    Science.gov (United States)

    2010-07-01

    ... resources, providing financial planning and scientific expertise (which often is not practical for permittee... mitigation may be performed using the methods of restoration, enhancement, establishment, and in certain..., habitat connectivity, relationships to hydrologic sources (including the availability of water rights...

  8. Is wetland mitigation successful in Southern California?

    Science.gov (United States)

    Cummings, D. L.; Rademacher, L. K.

    2004-12-01

    Wetlands perform many vital functions within their landscape position; they provide unique habitats for a variety of flora and fauna and they act as treatment systems for upstream natural and anthropogenic waste. California has lost an estimated 91% of its wetlands. Despite the 1989 "No Net Loss" policy and mitigation requirements by the regulatory agencies, the implemented mitigation may not be offsetting wetlands losses. The "No Net Loss" policy is likely failing for numerous reasons related to processes in the wetlands themselves and the policies governing their recovery. Of particular interest is whether these mitigation sites are performing essential wetlands functions. Specific questions include: 1) Are hydric soil conditions forming in mitigation sites; and, 2) are the water quality-related chemical transformations that occur in natural wetlands observed in mitigation sites. This study focuses on success (or lack of success) in wetlands mitigation sites in Southern California. Soil and water quality investigations were conducted in wetland mitigation sites deemed to be successful by vegetation standards. Observations of the Standard National Resource Conservation Service field indicators of reducing conditions were made to determine whether hydric soil conditions have developed in the five or more years since the implementation of mitigation plans. In addition, water quality measurements were performed at the inlet and outlet of these mitigation sites to determine whether these sites perform similar water quality transformations to natural wetlands within the same ecosystem. Water quality measurements included nutrient, trace metal, and carbon species measurements. A wetland location with minimal anthropogenic changes and similar hydrologic and vegetative features was used as a control site. All sites selected for study are within a similar ecosystem, in the interior San Diego and western Riverside Counties, in Southern California.

  9. Wildlife uses and hunting patterns in rural communities of the Yucatan Peninsula, Mexico.

    Science.gov (United States)

    Santos-Fita, Dídac; Naranjo, Eduardo J; Rangel-Salazar, José Luis

    2012-10-02

    Subsistence hunting is a traditional practice providing food and many other goods for households in the Yucatan Peninsula, southeast Mexico. Economic, demographic, and cultural change in this region drive wildlife habitat loss and local extinctions. Improving our understanding about current practices of wildlife use may support better management strategies for conserving game species and their habitat. We aimed to evaluate if wildlife use remained relevant for the subsistence of rural residents of the Yucatan Peninsula, as well as if local hunting practices were related to environmental, geographical, and cultural factors. Fieldwork was done between March 2010 and March 2011. Information was obtained through conversations, interviews, and participant observation. Record forms allowed recording animals hunted, biomass extracted, distance intervals to hunting sites, habitat types and seasonality of wildlife harvests. Data were analyzed using one-way Analysis of Variance, and Generalized Linear Models. Forty-six terrestrial vertebrate species were used for obtaining food, medicine, tools, adornments, pets, ritual objects, and for sale and mitigating damage. We recorded 968 animals taken in 664 successful hunting events. The Great Curassow, Ocellated Turkey, paca, white-tailed deer, and collared peccary were the top harvested species, providing 80.7% of biomass (10,190 kg). The numbers of animals hunted and biomass extracted declined as hunting distances increased from villages. Average per capita consumption was 4.65 ± 2.7 kg/person/year. Hunting frequencies were similar in forested and agricultural areas. Wildlife use, hunting patterns, and technologies observed in our study sites were similar to those recorded in previous studies for rural Mayan and mestizo communities in the Yucatan Peninsula and other Neotropical sites. The most heavily hunted species were those providing more products and by-products for residents. Large birds such as the Great Curassow and

  10. Wildlife uses and hunting patterns in rural communities of the Yucatan Peninsula, Mexico

    Directory of Open Access Journals (Sweden)

    Santos-Fita Dídac

    2012-10-01

    Full Text Available Abstract Background Subsistence hunting is a traditional practice providing food and many other goods for households in the Yucatan Peninsula, southeast Mexico. Economic, demographic, and cultural change in this region drive wildlife habitat loss and local extinctions. Improving our understanding about current practices of wildlife use may support better management strategies for conserving game species and their habitat. We aimed to evaluate if wildlife use remained relevant for the subsistence of rural residents of the Yucatan Peninsula, as well as if local hunting practices were related to environmental, geographical, and cultural factors. Methods Fieldwork was done between March 2010 and March 2011. Information was obtained through conversations, interviews, and participant observation. Record forms allowed recording animals hunted, biomass extracted, distance intervals to hunting sites, habitat types and seasonality of wildlife harvests. Data were analyzed using one-way Analysis of Variance, and Generalized Linear Models. Results Forty-six terrestrial vertebrate species were used for obtaining food, medicine, tools, adornments, pets, ritual objects, and for sale and mitigating damage. We recorded 968 animals taken in 664 successful hunting events. The Great Curassow, Ocellated Turkey, paca, white-tailed deer, and collared peccary were the top harvested species, providing 80.7% of biomass (10,190 kg. The numbers of animals hunted and biomass extracted declined as hunting distances increased from villages. Average per capita consumption was 4.65 ± 2.7 kg/person/year. Hunting frequencies were similar in forested and agricultural areas. Discussion Wildlife use, hunting patterns, and technologies observed in our study sites were similar to those recorded in previous studies for rural Mayan and mestizo communities in the Yucatan Peninsula and other Neotropical sites. The most heavily hunted species were those providing more products and by

  11. Urban Policies and Earthquake Risk Mitigation

    International Nuclear Information System (INIS)

    Sarlo, Antonella

    2008-01-01

    The paper aims at proposing some considerations about some recent experiences of research carried out on the theme of earthquake risk mitigation and combining policies and actions of mitigation with urban development strategies. The objective was to go beyond the classical methodological approach aiming at defining a 'technical' evaluation of the earthquake risk through a procedure which can correlate the three 'components' of danger, exposure and vulnerability. These researches experiment, in terms of methodology and application, with a new category of interpretation and strategy: the so-called Struttura Urbana Minima (Minimum urban structure).Actually, the introduction of the Struttura Urbana Minima establishes a different approach towards the theme of safety in the field of earthquake risk, since it leads to a wider viewpoint, combining the building aspect of the issue with the purely urban one, involving not only town planning, but also social and managerial implications.In this sense the constituent logic of these researches is strengthened by two fundamental issues:- The social awareness of earthquake;- The inclusion of mitigation policies in the ordinary strategies for town and territory management. Three main aspects of the first point, that is of the 'social awareness of earthquake', characterize this issue and demand to be considered within a prevention policy:- The central role of the risk as a social production,- The central role of the local community consent,- The central role of the local community capability to planTherefore, consent, considered not only as acceptance, but above all as participation in the elaboration and implementation of choices, plays a crucial role in the wider issue of prevention policies.As far as the second point is concerned, the inclusion of preventive mitigation policies in ordinary strategies for the town and territory management demands the identification of criteria of choice and priorities of intervention and, as a

  12. A Methodology to Support Decision Making in Flood Plan Mitigation

    Science.gov (United States)

    Biscarini, C.; di Francesco, S.; Manciola, P.

    2009-04-01

    The focus of the present document is on specific decision-making aspects of flood risk analysis. A flood is the result of runoff from rainfall in quantities too great to be confined in the low-water channels of streams. Little can be done to prevent a major flood, but we may be able to minimize damage within the flood plain of the river. This broad definition encompasses many possible mitigation measures. Floodplain management considers the integrated view of all engineering, nonstructural, and administrative measures for managing (minimizing) losses due to flooding on a comprehensive scale. The structural measures are the flood-control facilities designed according to flood characteristics and they include reservoirs, diversions, levees or dikes, and channel modifications. Flood-control measures that modify the damage susceptibility of floodplains are usually referred to as nonstructural measures and may require minor engineering works. On the other hand, those measures designed to modify the damage potential of permanent facilities are called non-structural and allow reducing potential damage during a flood event. Technical information is required to support the tasks of problem definition, plan formulation, and plan evaluation. The specific information needed and the related level of detail are dependent on the nature of the problem, the potential solutions, and the sensitivity of the findings to the basic information. Actions performed to set up and lay out the study are preliminary to the detailed analysis. They include: defining the study scope and detail, the field data collection, a review of previous studies and reports, and the assembly of needed maps and surveys. Risk analysis can be viewed as having many components: risk assessment, risk communication and risk management. Risk assessment comprises an analysis of the technical aspects of the problem, risk communication deals with conveying the information and risk management involves the decision process

  13. 36 CFR 241.1 - Cooperation in wildlife protection.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Cooperation in wildlife... FISH AND WILDLIFE General Provisions § 241.1 Cooperation in wildlife protection. (a) Officials of the... and regulations for the protection of wildlife. (b) Officials of the Forest Service who have been, or...

  14. 33 CFR 332.8 - Mitigation banks and in-lieu fee programs.

    Science.gov (United States)

    2010-07-01

    ... as the costs of land acquisition, planning, construction, monitoring, maintenance, contingencies... credit must also take into account contingency costs appropriate to the stage of project planning... using that mitigation bank or in-lieu fee program. (s) IRT concerns with use of credits. If, in the view...

  15. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Science.gov (United States)

    2010-07-01

    ... as the costs of land acquisition, planning, construction, monitoring, maintenance, contingencies... credit must also take into account contingency costs appropriate to the stage of project planning... using that mitigation bank or in-lieu fee program. (s) IRT concerns with use of credits. If, in the view...

  16. 77 FR 60135 - St. Johns National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of No...

    Science.gov (United States)

    2012-10-02

    ... possible to benefit refuge wildlife. Under Alternative C, we will expand management of wood storks and..., hiking, and bicycling. Bicycling that does not support appropriate and compatible uses, such as mountain...

  17. Stepwise mitigation of the Macesnik landslide, N Slovenia

    Directory of Open Access Journals (Sweden)

    M. Mikoš

    2005-01-01

    Full Text Available The paper gives an overview of the history of evolution and mitigation of the Macesnik landslide in N Slovenia. It was triggered in 1989 above the Solčava village, but it enlarged with time. In 2005, the landslide has been threatening a few residential and farm houses, as well as the panoramic road, and it is only 1000 m away from the Savinja River and the village of Solčava. It is 2500 m long and up to more than 100 m wide with an estimated volume in excess of 2 million m3. Its depth is not constant: on average it is 10 to 15 m deep, but in the area of the toe, which is retained by a rock outcrop, it reaches the depth of 30 m. The unstable mass consists of water-saturated highly-weathered carboniferous formations. The presently active landslide lies within the fossil landslide which is up to 350 m wide and 50 m deep with the total volume estimated at 8 to 10 million m3. Since 2000, the landslide has been investigated by 36 boreholes, and 28 of them were equipped with inclinometer casings, which also serve as piezometers. Surface movements have been monitored geodetically in 20 cross sections. This helped to understand the causes and mechanics of the landslide. Therefore, landslide mitigation works were planned rather to reduce the landslide movement so that the resulting damages could be minimized. The construction of mitigation works was made difficult in the 1990s due to intensive landslide movements that could reach up to 50 cm/day with an average of 25 cm/day. Since 2001, surface drainage works in the form of open surface drains have mainly been completed around the circumference of the landslide as the first phase of the mitigation works and they are regularly maintained. As a final mitigation solution, plans have been made to build a combination of subsurface drainage works in the form of deep drains with retaining works in the form of concrete vertical shafts functioning as deep water wells to drain the landslide, and as dowels to stop

  18. Pesticides and their effects on wildlife

    Energy Technology Data Exchange (ETDEWEB)

    Driver, C.J.

    1994-07-01

    About 560 active ingredients are currently used as pesticides. Applications of these pesticides are made to agricultural lands and other areas inhabited by wildlife. Unfortunately, many agricultural-use pesticides also entail some measure of risk to organisms other than the pest species. Because testing of pesticides prior to registration cannot evaluate all the potential environmental-pesticide-wildlife/fish interactions, current methods of risk assessment do not always provide sufficient safety to nontarget organisms. This is evidenced by die-offs of fish and wildlife from applications of pesticides at environmentally {open_quotes}safe{close_quotes} rates, the linking of population declines of some species with agrochemical use, and observations of survival-threatening behavioral changes in laboratory and field animals exposed to typical field levels of pesticides. It is important to note, however, that the majority of pesticides, when properly applied, have not caused significant injury to wildlife. A brief summary of pesticide effects on wildlife and fish are presented for the common classes of pesticides in use today.

  19. Wildlife Districts

    Data.gov (United States)

    Vermont Center for Geographic Information — The Wildlife Districts layer is part of a larger dataset contains administrative boundaries for Vermont's Agency of Natural Resources. The dataset includes feature...

  20. Assessing large-scale wildlife responses to human infrastructure development.

    Science.gov (United States)

    Torres, Aurora; Jaeger, Jochen A G; Alonso, Juan Carlos

    2016-07-26

    Habitat loss and deterioration represent the main threats to wildlife species, and are closely linked to the expansion of roads and human settlements. Unfortunately, large-scale effects of these structures remain generally overlooked. Here, we analyzed the European transportation infrastructure network and found that 50% of the continent is within 1.5 km of transportation infrastructure. We present a method for assessing the impacts from infrastructure on wildlife, based on functional response curves describing density reductions in birds and mammals (e.g., road-effect zones), and apply it to Spain as a case study. The imprint of infrastructure extends over most of the country (55.5% in the case of birds and 97.9% for mammals), with moderate declines predicted for birds (22.6% of individuals) and severe declines predicted for mammals (46.6%). Despite certain limitations, we suggest the approach proposed is widely applicable to the evaluation of effects of planned infrastructure developments under multiple scenarios, and propose an internationally coordinated strategy to update and improve it in the future.

  1. Quadcopter applications for wildlife monitoring

    Science.gov (United States)

    Radiansyah, S.; Kusrini, M. D.; Prasetyo, L. B.

    2017-01-01

    Recently, Unmanned Aerial Vehicle (UAV) had been use as an instrument for wildlife research. Most of that, using an airplane type which need space for runaway. Copter is UAV type that can fly at canopy space and do not need runaway. The research aims are to examine quadcopter application for wildlife monitoring, measure the accuracy of data generated and determine effective, efficient and appropriate technical recommendation in accordance with the ethics of wildlife photography. Flight trials with a camera 12 - 24 MP at altitude ranges from 50-200 m above ground level (agl), producing aerial photographs with spatial resolution of 0.85 - 4.79 cm/pixel. Aerial photos quality depends on the type and setting of camera, vibration damper system, flight altitude and punctuality of the shooting. For wildlife monitoring the copter is recommended to take off at least 300 m from the target, and flies at 50 - 100 m agl with flight speed of 5 - 7 m/sec on fine weather. Quadcopter presence with a distance more than 30 m from White-bellied Sea Eagles (Haliaeetus leucogaster) nest and Proboscis Monkey (Nasalis larvatus) did not cause negative response. Quadcopter application should pay attention to the behaviour and characteristic of wildlife.

  2. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    Science.gov (United States)

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  3. 78 FR 63069 - Special Regulations; Areas of the National Park System; Yellowstone National Park; Winter Use

    Science.gov (United States)

    2013-10-23

    ... soundscapes, visitor use and experience, and park operations. Impacts associated with each of the alternatives..., soundscapes, and health and safety, were used in formulating the alternatives in the Plan/SEIS. Applies the... To mitigate impacts to wildlife, air quality, natural soundscapes, and visitor and employee safety...

  4. Forecasting the relative influence of environmental and anthropogenic stressors on polar bears

    Science.gov (United States)

    Todd C. Atwood; Bruce G. Marcot; David C. Douglas; Steven C. Amstrup; Karyn D. Rode; George M. Durner; Jeffrey F. Bromaghin

    2016-01-01

    Effective conservation planning requires understanding and ranking threats to wildlife populations. We developed a Bayesian network model to evaluate the relative influence of environmental and anthropogenic stressors, and their mitigation, on the persistence of polar bears (Ursus maritimus). Overall sea ice conditions, affected by rising global...

  5. Habitat Evaluation Procedures (HEP) Report; Burlington Bottoms, Technical Report 1993-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Beilke, Susan

    1993-08-01

    Burlington Bottoms, consisting of approximately 417 acres of riparian and wetland habitat, was purchased by the Bonneville Power Administration in November 1991. The site is located approximately 1/2 mile north of the Sauvie Island Bridge (T2N R1W Sections 20, 21), and is bound on the east side by Multnomah Channel and on the west side by the Burlington Northern Railroad right-of-way and U.S. Highway 30 (Figures 1 and 2). Wildlife habitat values resulting from the purchase of this site will contribute toward the goal of mitigating for habitat lost as outlined in the Columbia and Willamette River Basin's Fish and Wildlife Program and Amendments. Under this Program, mitigation goals were developed as a result of the loss of wildlife habitat due to the development and operation of Federal hydro-electric facilities in the Columbia and Willamette River Basins. In 1993, an interdisciplinary team was formed to develop and implement quantitative Habitat Evaluation Procedures (HEP) to document the value of various habitats at Burlington Bottoms. Results of the HEP will be used to: (1) determine the current status and habitat enhancement potential of the site consistent with wildlife mitigation goals and objectives; and (2) develop a management plan for the area. HEP participants included; Charlie Craig, BPA; Pat Wright, Larry Rasmussen, and Ron Garst, U. S. Fish and Wildlife Service; John Christy, The Nature Conservancy; and Doug Cottam, Sue Beilke, and Brad Rawls, Oregon Department of Fish and Wildlife.

  6. 14 CFR 139.337 - Wildlife hazard management.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Wildlife hazard management. 139.337 Section... AIRPORTS Operations § 139.337 Wildlife hazard management. (a) In accordance with its Airport Certification... alleviate wildlife hazards whenever they are detected. (b) In a manner authorized by the Administrator, each...

  7. 77 FR 50213 - Endangered and Threatened Wildlife and Plants; Designation of Critical Habitat for Jaguar

    Science.gov (United States)

    2012-08-20

    ... listings for foreign species and species native to the United States. At that time, the jaguar was believed.... The foreign and native lists were replaced by a single ``List of Endangered and Threatened Wildlife... Jaguar (Jaguar Recovery Team 2012, entire) and Digital Mapping in Support of Recovery Planning for the...

  8. Key challenges of offshore wind power: Three essays addressing public acceptance, stakeholder conflict, and wildlife impacts

    Science.gov (United States)

    Bates, Alison Waterbury

    been proposed. The essay examines how the public considers the societal tradeoffs that are made to develop small-scale, in-view demonstration wind projects instead of larger facilities farther offshore. Results indicate that a strong majority of the public supports near-shore demonstration wind projects in both states. Primary reasons for support include benefits to wildlife, cost of electricity, and job creation, while the primary reasons for opposition include wildlife impacts, aesthetics, tourism, and user conflicts. These factors differ between coastal Delaware and greater Atlantic City and highlight the importance of local, community engagement in the early stages of development. The second essay examines the interaction of a new proposed use of the ocean---offshore wind---and a key existing ocean user group---commercial fishers. A key component of offshore wind planning includes consideration of existing uses of the marine environment in order to optimally site wind projects while minimizing conflicts. Commercial fisheries comprise an important stakeholder group, and may be one of the most impacted stakeholders from offshore renewable energy development. Concern of the fishing industry stems from possible interference with productive fishing grounds and access within wind developments resulting in costs from increased effort or reduction in catch. Success of offshore wind development may in part depend on the acceptance of commercial fishers, who are concerned about loss of access to fishing grounds. Using a quantitative, marine spatial planning approach in the siting of offshore wind projects with respect to commercial fishing in the mid-Atlantic, U.S., this essay develops a spatially explicit representation of potential conflicts and compatibilities between these two industries in the mid-Atlantic region of the United States. Areas that are highly valuable to the wind industry are determined through a spatial suitability model using variable cost per unit

  9. A Few Large Roads or Many Small Ones? How to Accommodate Growth in Vehicle Numbers to Minimise Impacts on Wildlife

    Science.gov (United States)

    Rhodes, Jonathan R.; Lunney, Daniel; Callaghan, John; McAlpine, Clive A.

    2014-01-01

    Roads and vehicular traffic are among the most pervasive of threats to biodiversity because they fragmenting habitat, increasing mortality and opening up new areas for the exploitation of natural resources. However, the number of vehicles on roads is increasing rapidly and this is likely to continue into the future, putting increased pressure on wildlife populations. Consequently, a major challenge is the planning of road networks to accommodate increased numbers of vehicles, while minimising impacts on wildlife. Nonetheless, we currently have few principles for guiding decisions on road network planning to reduce impacts on wildlife in real landscapes. We addressed this issue by developing an approach for quantifying the impact on wildlife mortality of two alternative mechanisms for accommodating growth in vehicle numbers: (1) increasing the number of roads, and (2) increasing traffic volumes on existing roads. We applied this approach to a koala (Phascolarctos cinereus) population in eastern Australia and quantified the relative impact of each strategy on mortality. We show that, in most cases, accommodating growth in traffic through increases in volumes on existing roads has a lower impact than building new roads. An exception is where the existing road network has very low road density, but very high traffic volumes on each road. These findings have important implications for how we design road networks to reduce their impacts on biodiversity. PMID:24646891

  10. A few large roads or many small ones? How to accommodate growth in vehicle numbers to minimise impacts on wildlife.

    Directory of Open Access Journals (Sweden)

    Jonathan R Rhodes

    Full Text Available Roads and vehicular traffic are among the most pervasive of threats to biodiversity because they fragmenting habitat, increasing mortality and opening up new areas for the exploitation of natural resources. However, the number of vehicles on roads is increasing rapidly and this is likely to continue into the future, putting increased pressure on wildlife populations. Consequently, a major challenge is the planning of road networks to accommodate increased numbers of vehicles, while minimising impacts on wildlife. Nonetheless, we currently have few principles for guiding decisions on road network planning to reduce impacts on wildlife in real landscapes. We addressed this issue by developing an approach for quantifying the impact on wildlife mortality of two alternative mechanisms for accommodating growth in vehicle numbers: (1 increasing the number of roads, and (2 increasing traffic volumes on existing roads. We applied this approach to a koala (Phascolarctos cinereus population in eastern Australia and quantified the relative impact of each strategy on mortality. We show that, in most cases, accommodating growth in traffic through increases in volumes on existing roads has a lower impact than building new roads. An exception is where the existing road network has very low road density, but very high traffic volumes on each road. These findings have important implications for how we design road networks to reduce their impacts on biodiversity.

  11. A few large roads or many small ones? How to accommodate growth in vehicle numbers to minimise impacts on wildlife.

    Science.gov (United States)

    Rhodes, Jonathan R; Lunney, Daniel; Callaghan, John; McAlpine, Clive A

    2014-01-01

    Roads and vehicular traffic are among the most pervasive of threats to biodiversity because they fragmenting habitat, increasing mortality and opening up new areas for the exploitation of natural resources. However, the number of vehicles on roads is increasing rapidly and this is likely to continue into the future, putting increased pressure on wildlife populations. Consequently, a major challenge is the planning of road networks to accommodate increased numbers of vehicles, while minimising impacts on wildlife. Nonetheless, we currently have few principles for guiding decisions on road network planning to reduce impacts on wildlife in real landscapes. We addressed this issue by developing an approach for quantifying the impact on wildlife mortality of two alternative mechanisms for accommodating growth in vehicle numbers: (1) increasing the number of roads, and (2) increasing traffic volumes on existing roads. We applied this approach to a koala (Phascolarctos cinereus) population in eastern Australia and quantified the relative impact of each strategy on mortality. We show that, in most cases, accommodating growth in traffic through increases in volumes on existing roads has a lower impact than building new roads. An exception is where the existing road network has very low road density, but very high traffic volumes on each road. These findings have important implications for how we design road networks to reduce their impacts on biodiversity.

  12. Anticoagulant rodenticide toxicity to non-target wildlife under controlled exposure conditions

    Science.gov (United States)

    Rattner, Barnett A.; Mastrota, F. Nicholas; van den Brink, Nico; Elliott, J.; Shore, R.; Rattner, B.

    2018-01-01

    -target wildlife. Ecological risk assessments of anticoagulant rodenticides would be improved with additional data on (i) interspecific differences in sensitivity, particularly for understudied taxa, (ii) sublethal effects unrelated to coagulopathy, (iii) responses to mixtures and sequential exposures, and (iv) the role of vitamin K status on toxicity, and significance of inclusion of supplemental vitamin K or menadione (provitamin) in the diet of test organisms. A more complete understanding of the toxicity of anticoagulant rodenticides in non-target wildlife would enable regulators and natural resource managers to better predict and even mitigate risk.

  13. Determination of Section 404 Permit and Habitat Mitigation Requirements

    Science.gov (United States)

    2012-09-01

    The Arizona Department of Transportation (ADOT) is committed to developing habitat, mitigation, : monitoring, and maintenance plans that replace the loss of the functions and values of an area and : are self-sustaining, thereby providing long-term co...

  14. 77 FR 76510 - Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-12-28

    ... purposes and goals and contributing to the mission of the National Wildlife Refuge System (NWRS). CCPs... management alternatives to address these issues; help achieve refuge goals, objectives, and purposes; and... and reduce conflicts between users (e.g., not opening Prime Hook Creek to hunting). We will continue...

  15. 36 CFR 13.920 - Wildlife distance conditions.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Wildlife distance conditions... Provisions § 13.920 Wildlife distance conditions. (a) Bears. The following are prohibited: (1) Approaching within 300 yards of a bear; or (2) Engaging in photography within 300 yards of a bear. (b) Other wildlife...

  16. 33 CFR 332.4 - Planning and documentation.

    Science.gov (United States)

    2010-07-01

    ... should be kept confidential for business purposes, such as the exact location of a proposed mitigation... minimization and the amount, type, and location of any proposed compensatory mitigation, including any out-of... mitigation proposals and plans must be conducted in accordance with the terms and conditions of those permits...

  17. Wildlife Habitat Improvement Guide for Minnesota Youth.

    Science.gov (United States)

    Halsey, Clifton

    This publication outlines projects to increase wildlife, primarily fowl and deer, and to help rural youth better understand wildlife requirements. The publication outlines six basic steps that are involved in initiating a wildlife project. These are: (1) Determine the types of wild animals for which the land is best suited; (2) Study the life…

  18. Disease emergence and resurgence—the wildlife-human connection

    Science.gov (United States)

    Friend, Milton; Hurley, James W.; Nol, Pauline; Wesenberg, Katherine

    2006-01-01

    In 2000, the Global Outbreak Alert and Response Network (GOARN) was organized as a global disease watchdog group to coordinate disease outbreak information and health crisis response. The World Health Organization (WHO) is the headquarters for this network. Understandably, the primary focus for WHO is human health. However, diseases such as the H5N1 avian influenza epizootic in Asian bird populations demonstrate the need for integrating knowledge about disease emergence in animals and in humans.Aside from human disease concerns, H5N1 avian influenza has major economic consequences for the poultry industry worldwide. Many other emerging diseases, such as severe acute respiratory syndrome (SARS), monkeypox, Ebola fever, and West Nile fever, also have an important wildlife component. Despite these wildlife associations, the true integration of the wildlife component in approaches towards disease emergence remains elusive. This separation between wildlife and other species’ interests is counterproductive because the emergence of zoonotic viruses and other pathogens maintained by wildlife reservoir hosts is poorly understood.This book is about the wildlife component of emerging diseases. It is intended to enhance the reader’s awareness of the role of wildlife in disease emergence. By doing so, perhaps a more holistic approach to disease prevention and control will emerge for the benefit of human, domestic animal, and free-ranging wildlife populations alike. The perspectives offered are influenced by more than four decades of my experiences as a wildlife disease practitioner. Although wildlife are victims to many of the same disease agents affecting humans and domestic animals, many aspects of disease in free-ranging wildlife require different approaches than those commonly applied to address disease in humans or domestic animals. Nevertheless, the broader community of disease investigators and health care professionals has largely pursued a separatist approach for

  19. Fish and wildlife surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Poston, T.M.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the monitoring of radioactive contaminants in fish and wildlife species that inhabit the Colombia River and Hanford Site. Wildlife have access to areas of the Site containing radioactive contamination, and fish can be exposed to contamination in spring water entering the river along the shoreline. Therefore, samples are collected at various locations annually, generally during the hunting or fishing season, for selected species.

  20. Foodborne parasites from wildlife

    DEFF Research Database (Denmark)

    Kapel, Christian Moliin Outzen; Fredensborg, Brian Lund

    2015-01-01

    The majority of wild foods consumed by humans are sourced from intensively managed or semi-farmed populations. Management practices inevitably affect wildlife density and habitat characteristics, which are key elements in the transmission of parasites. We consider the risk of transmission...... of foodborne parasites to humans from wildlife maintained under natural or semi-natural conditions. A deeper understanding will be useful in counteracting foodborne parasites arising from the growing industry of novel and exotic foods....