WorldWideScience

Sample records for well maintenance

  1. An intelligent tele-healthcare environment offering person-centric and wellness-maintenance services.

    Science.gov (United States)

    Abidi, S S

    2001-06-01

    Worldwide healthcare delivery trends are undergoing a subtle paradigm shift--patient centered services as opposed to provider centered services and wellness maintenance as opposed to illness management. In this paper we present a Tele-Healthcare project TIDE--Tele-Healthcare Information and Diagnostic Environment. TIDE manifests an 'intelligent' healthcare environment that aims to ensure lifelong coverage of person-specific health maintenance decision-support services--i.e., both wellness maintenance and illness management services--ubiquitously available via the Internet/WWW. Taking on an all-encompassing health maintenance role--spanning from wellness to illness issues--the functionality of TIDE involves the generation and delivery of (a) Personalized, Pro-active, Persistent, Perpetual, and Present wellness maintenance services, and (b) remote diagnostic services for managing noncritical illnesses. Technically, TIDE is an amalgamation of diverse computer technologies--Artificial Intelligence, Internet, Multimedia, Databases, and Medical Informatics--to implement a sophisticated healthcare delivery infostructure.

  2. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  3. Engineering and Design. Design, Construction, and Maintenance of Relief Wells

    National Research Council Canada - National Science Library

    1992-01-01

    The objective of this manual is to provide guidance and information on the design, construction, and maintenance of pressure relief wells installed for the purpose of relieving subsurface hydrostatic...

  4. Results of calendar year 1995 Well Inspection and Maintenance Program Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.

    1996-07-01

    This document is a compendium of results of the 1995 Monitor Well Inspection and Maintenance Program at the US Department of Energy's Oak Ridge Y-12 Plant. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the effective longevity of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant from August through December 1995

  5. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.; Jones, S.B.; Sitzler, J.L.

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December

  6. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

  7. What Predicts Exercise Maintenance and Well-Being? Examining The Influence of Health-Related Psychographic Factors and Social Media Communication.

    Science.gov (United States)

    Zhou, Xin; Krishnan, Archana

    2018-01-26

    Habitual exercising is an important precursor to both physical and psychological well-being. There is, thus, a strong interest in identifying key factors that can best motivate individuals to sustain regular exercise regimen. In addition to the importance of psychographic factors, social media use may act as external motivator by allowing users to interact and communicate about exercise. In this study, we examined the influence of health consciousness, health-oriented beliefs, intrinsic motivation, as willingness to communicate about health on social media, social media activity on exercise, and online social support on exercise maintenance and well-being on a sample of 532 American adults. Employing structural equation modeling, we found that health-oriented beliefs mediated the effect of health consciousness on intrinsic motivation which in turn was a significant predictor of exercise maintenance. Exercise maintenance significantly predicted both physical and psychological well-being. Extrinsic motivators, as measured by willingness to communicate about health on social media, social media activity on exercise, and online social support did not however significantly influence exercise maintenance. These findings have implications for the design and implementation of exercise-promoting interventions by identifying underlying factors that influence exercise maintenance.

  8. Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company

    Science.gov (United States)

    Siswanto, A.; Kurniati, N.

    2018-04-01

    An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.

  9. Development of a robot for decontamination of reactor well and maintenance pit wall surfaces

    International Nuclear Information System (INIS)

    Miyakawa, Minoru; Nozawa, Katsuro; Mizutani, Takeshi; Onozuka, Kazuaki; Morita, Isamu

    1984-01-01

    A robot has been developed at Hamaoka BWR Power Plant of Chubu Electric Power Company, Inc., which performs the decontamination of the wall surfaces of reactor wells and maintenance pits. The robot is controlled with a control box through a micro-computer. The mechanical structure and working principle of this robot is explained. One of the special features of this robot is that it perceives the steps on a wall, and washes the vertical and horizontal surfaces with two different types of brushes. As the material for the bristles of the brushes, nylon with alumina as abrasive (TAINEX-A made by Dupont Ltd.) was selected after some experience. The design specifications of the brushes were determined, based on the results of intensive performance test, which are shown in this report. The efficiency of this robot was proved by applying it to the decontamination of the reactor wells in the periodic inspection and maintenance of Unit 1 and Unit 2 in the Hamaoka BWR Power Plant. As the result of this decontamination, the contamination level was reduced from about 10 -3 μCi/cm 2 to about 10 -5 μCi/cm 2 . The measured results of contamination after the first and third decontamination works are listed for various parts of the well surfaces. (Aoki, K.)

  10. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  11. Development of a robot for decontamination of reactor well and maintenance pit wall surfaces

    Energy Technology Data Exchange (ETDEWEB)

    Miyakawa, Minoru; Nozawa, Katsuro; Mizutani, Takeshi; Onozuka, Kazuaki; Morita, Isamu

    1984-03-01

    A robot has been developed at Hamaoka BWR Power Plant of Chubu Electric Power Company, Inc., which performs the decontamination of the wall surfaces of reactor wells and maintenance pits. The robot is controlled with a control box through a micro-computer. The mechanical structure and working principle of this robot is explained. One of the special features of this robot is that it perceives the steps on a wall, and washes the vertical and horizontal surfaces with two different types of brushes. As the material for the bristles of the brushes, nylon with alumina as abrasive (TAINEX-A made by Dupont Ltd.) was selected after some experience. The design specifications of the brushes were determined, based on the results of intensive performance test, which are shown in this report. The efficiency of this robot was proved by applying it to the decontamination of the reactor wells in the periodic inspection and maintenance of Unit 1 and Unit 2 in the Hamaoka BWR Power Plant. As the result of this decontamination, the contamination level was reduced from 10/sup 3/ ..mu..Ci/cm/sup 2/ to about 10/sup 5/ ..mu..Ci/cm/sup 2/. The measured results of contamination after the first and third decontamination works are listed for various parts of the well surfaces.

  12. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  13. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  14. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  15. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  16. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  17. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  18. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  19. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  20. Safety related maintenance in the framework of the reliability centered maintenance concept

    International Nuclear Information System (INIS)

    1992-07-01

    Elevated safety requirements and ever increasing costs of maintenance of nuclear power plants stimulate the interest in different methods and approaches to optimize maintenance activities. Among different concepts, the Reliability Centered Maintenance (RCM) as an approach to improve Preventive Maintenance (PM) programmes is being widely discussed an applied in several IAEA Member States. In order to summarize basic principles and current implementation of the RCM, the IAEA organized a Consultants Meeting in November 1990. The report prepared during that meeting was discussed during the Technical Committee Meeting (TCM) held in May 1991. Numerous technical presentations as well as panel and plenary discussions took place at the TCM. This document contains the report of the Consultants Meeting (modified to include comments of the TCM), a summary of the most important discussions as well as all 14 papers presented at the TCM

  1. Information-Based Maintenance Optimization with Focus on Predictive Maintenance (Informatiegebaseerde onderhoudsoptimalisatie met focus op predictief onderhoud)

    OpenAIRE

    Van Horenbeek, Adriaan

    2013-01-01

    This dissertation presents an information-based maintenance optimization methodology for physical assets; with focus on, but not limited to, predictive maintenance (PdM). The overall concept of information-based maintenance is that of updating maintenance decisions based on evolving knowledge of operation history and anticipated usage of the machinery, as well as the physics and dynamics of material degradation in critical machinery components. Within this concept, predictive maintenance is a...

  2. Relationship Maintenance on Facebook: Development of a Measure, Relationship to General Maintenance, and Relationship Satisfaction

    Science.gov (United States)

    Dainton, Marianne

    2013-01-01

    Previous research indicates that the primary reason college students use Facebook is for relationship maintenance. The present study sought to determine the relationship between Facebook maintenance and general maintenance efforts in college student romantic relationships, as well as the impacts of such behaviors on the relationship. Survey data…

  3. Predicting maintenance of attendance at walking groups: testing constructs from three leading maintenance theories.

    Science.gov (United States)

    Kassavou, Aikaterini; Turner, Andrew; Hamborg, Thomas; French, David P

    2014-07-01

    Little is known about the processes and factors that account for maintenance, with several theories existing that have not been subject to many empirical tests. The aim of this study was to test how well theoretical constructs derived from the Health Action Process Approach, Rothman's theory of maintenance, and Verplanken's approach to habitual behavior predicted maintenance of attendance at walking groups. 114 participants, who had already attended walking groups in the community for at least 3 months, completed a questionnaire assessing theoretical constructs regarding maintenance. An objective assessment of attendance over the subsequent 3 months was gained. Multilevel modeling was used to predict maintenance, controlling for clustering within walking groups. Recovery self-efficacy predicted maintenance, even after accounting for clustering. Satisfaction with social outcomes, satisfaction with health outcomes, and overall satisfaction predicted maintenance, but only satisfaction with health outcomes significantly predicted maintenance after accounting for clustering. Self-reported habitual behavior did not predict maintenance despite mean previous attendance being 20.7 months. Recovery self-efficacy, and satisfaction with health outcomes of walking group attendance appeared to be important for objectively measured maintenance, whereas self-reported habit appeared not to be important for maintenance at walking groups. The findings suggest that there is a need for intervention studies to boost recovery self-efficacy and satisfaction with outcomes of walking group attendance, to assess impact on maintenance.

  4. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  5. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  6. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  7. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  8. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  9. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  10. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  11. Principles of machine operation and maintenance

    CERN Document Server

    Jeffrey, Dick

    2013-01-01

    This book explains how rotating machinery works, and the role of the maintenance engineer in ensuring its proper operation. Stress is laid on the need for the trainee engineer to develop skills in diagnosis and troubleshooting as well as practicalexpertise in maintenance procedures.

  12. Systematization of Angra-1 operation attendance - Maintenance and periodic testings

    International Nuclear Information System (INIS)

    Furieri, E.B.; Carvalho Bruno, N. de; Salaverry, N.A.

    1988-01-01

    A maintenance analysis, their types and their functions for the safety of nuclear power plants is done. Programs and present trends in the reactor maintenance, as well as the maintenance program and periodic tests of Angra I, are analysed. The necessities of safety analysis and a systematization for maintenance attendance are discussed and the periodic testing as well as the attendance of international experience. (M.C.K.) [pt

  13. Maintenance of scientific instruments

    International Nuclear Information System (INIS)

    Lucero, E.

    1986-01-01

    During the last years Colombia has increased the use of nuclear techniques, instruments and equipment in ambitious health programs, as well as in research centers, industry and education; this has resulted in numerous maintenance problems. As an alternative solution IAN has established a Central Maintenance Laboratory for nuclear instruments within an International Atomic Energy Agency program for eight Latin American and nine Asian Countries. Established strategies and some results are detailed in this writing

  14. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  15. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance,......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  16. Evaluations of maintenance effectiveness on unavailability and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1993-01-01

    A methodology is presented for quantifying the effectiveness of maintenance on unavailability and on risk. The methodology is based on standard Markov modeling principles. What is new is the application to quantify maintenance effectiveness by explicitly quantifying maintenance benefits as well as maintenance's negative contributions. Maintenance effects are quantified by defining a degraded state for the component in addition to an operational state and a failed state which are usually defined. The maintenance model which is developed is a natural extension of the standard models used in reliability analysis and in Probabilistic Risk Assessments (PRAs). The results which are obtained can be directly used in PRAs. Applications of the methodology are presented by quantifying maintenance effectiveness on component performance and component unavailability for specific maintenance schedules

  17. Machinery prognostics and prognosis oriented maintenance management

    CERN Document Server

    Yan, Jihong

    2014-01-01

    This book gives a complete presentatin of the basic essentials of machinery prognostics and prognosis oriented maintenance management, and takes a look at the cutting-edge discipline of intelligent failure prognosis technologies for condition-based maintenance.  Latest research results and application methods are introduced for signal processing, reliability moelling, deterioration evaluation, residual life prediction and maintenance-optimization as well as applications of these methods.

  18. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  19. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  20. A review of e-maintenance capabilities and challenges

    OpenAIRE

    Adolfo Crespo Marquez; Benoit Iung

    2008-01-01

    Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. E-maintenance integrates existing telemaintenance principles, with web-services and modern e-collaboration principles. Collaboration allows not only to share and exchange information but also knowledge and (e)-intelligence. This paper outlines the basic capabilities provided by e-maintenance to companies as well as describes emerging challenges to benefit from these new o...

  1. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  2. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  3. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    with current system performance trends as well as historical records. This paper discusses the experience gained in CANDU plants with the application of these maintenance tools and the results achieved to date. New technologies being developed by Atomic Energy of Canada Limited for CANDU plants will also be discussed. (author)

  4. A review of e-maintenance capabilities and challenges

    Directory of Open Access Journals (Sweden)

    Adolfo Crespo Marquez

    2008-02-01

    Full Text Available Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. E-maintenance integrates existing telemaintenance principles, with web-services and modern e-collaboration principles. Collaboration allows not only to share and exchange information but also knowledge and (e-intelligence. This paper outlines the basic capabilities provided by e-maintenance to companies as well as describes emerging challenges to benefit from these new operational improvement opportunities

  5. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  6. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  7. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  8. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  9. A Novel of Hybrid Maintenance Management Models for Industrial Applications

    OpenAIRE

    Tahir, Zulkifli

    2010-01-01

    It is observed through empirical studies that the effectiveness of industrial process have been increased by a well organized of machines maintenance structure. In current research, a novel of maintenance concept has been designed by hybrid several maintenance management models with Decision Making Grid (DMG), Analytic Hierarchy Process (AHP) and Fuzzy Logic. The concept is designed for maintenance personnel to evaluate and benchmark the maintenance operations and to reveal important maintena...

  10. Integrated services and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Roos, Georg

    2001-01-01

    The general situation concerning services and nuclear power maintenance is reviewed following liberalization of Europa's power market. Issues relating to outsourcing maintenance services, effectiveness and reducing cost structure of maintenance are addressed on the cases of power markets in northern countries, Spain, Switzerland, Germany and Hungary. A special attention is paid on range of maintenance activity offered and performanced by Framatome. Ways of reducing costs in the field of maintenance as well as of reducing outage time are indicated. In conclusion, the following items are emphasized: - liberalization of Europe's power market in eastern Europe at its beginning; - in-house service in eastern Europe with numerous personnel; - Framatome ANP covers the entire range of maintenance competence; - consultance can be the first approach for a common co-operation

  11. Taipower plans to cut O and M costs [reactor maintenance management

    International Nuclear Information System (INIS)

    Tsui, S.J.

    1989-01-01

    Taipower aims to reduce operation and maintenance costs at its three BWRs, as well as the time devoted by plant personnel to O and M paper work, by ensuring that maintenance and spare-parts management is systematic and well documented. It is currently developing an on-line maintenance information system, known as the Maintenance Management Computerization System (MMCS), which can be accessed from any of Taipower's plants. MMCS is designed to be an on-line interactive multiple-user system through which the authorized user has immediate access to maintenance information. It will be used for preventive and corrective maintenance, surveillance tests, tagging, document control, instrument calibration and refuelling outage management. The system is simple to operate, using pull-down menus and standard text. (author)

  12. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  13. Performance Improvement through Implementation of Lean Maintenance

    OpenAIRE

    S. Kolanjiappan; Dr. K. Maran

    2011-01-01

    Lean Maintenance is a relatively new term, invented in the last decade of the twentieth century, but the principles are well established in Total Productive Maintenance (TPM). Lean Maintenance—taking its lead from Lean Manufacturing—applies some new techniques to TPM concepts to render a more structured implementation path. Tracing its roots back to Henry Ford with modern refinements born in Japanese manufacturing, specifically the Toyota Production System (TPS). Lean seeks to eliminate a...

  14. Visual simulation study of equipment maintenance in dangerous environment

    International Nuclear Information System (INIS)

    Zhu Bo; Yang Yanhua; Li Shiting

    2010-01-01

    The maintenance characteristics in dangerous environments are analyzed, and the application characteristics of visualized maintenance technology are introduced. The interactive method to implement maintenance simulation is presented using EON simulation platform. Then an interacted Virtual Maintenance Training System (VMTS) is further developed, and the composition and function are described in details. The VMTS can be used in extensive array of application scopes, and it is well compatible to the hardware of virtual reality. (author)

  15. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  16. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  17. Development of Simulator Maintenance Engineer Qualification Program Draft

    International Nuclear Information System (INIS)

    Chung, Kyung Hun

    2010-01-01

    As of 2009, KHNP has currently seven full scope simulators that are used for training of Nuclear Power Plant (NPP) Operators. Well-trained Simulator Maintenance Engineers (SME) are required to support these simulators. These SMEs will maintain and address any issues identified or any changes required for keep up the simulator with their respective plant sites. These issues will be identified as Simulator Discrepancy Reports (DR) or Work Order (WO) by the simulator operation personnel in KHNP. The simulator maintenance is a very complex. The simulator consists of many areas of process and requires experts in software modeling for different processes such as Neutronics, thermohydraulics, Logics, control, Electrical systems and computer systems as well as hardware subjects such as I and C, I/O, computers, etc. All these areas need experts the subject expertise need to be divided among SME's. In other word the SME's need to be trained for different expertise as well as having different level of SME's. KHNP has seen the need to outsource the maintenance work for these complex simulators. To have one company concentrating on this work will have many benefits such as: · Provides proper and well trained experts · Maintains consistent support personnel · Maintains the maintenance history for the simulator · Coordinates and Maintains the knowledge in house · The simulator maintenance will be consistent In order to accomplish the goals, KEPCO RI has recognized that there is a need for a program to adequately train and qualify the SME's. KEPCO RI and GSE, which has provided 6 simulators among 7 NPP simulators in Korea, have jointly developed this Simulator Maintenance Engineer Qualification Program (SMEQP). After issue of this plan, KEPCO RI will maintain and modify as needed periodically to meet the goals and purpose of the plan

  18. Tribological diagnostics as a precondition for maintenance

    International Nuclear Information System (INIS)

    Jolevski, Tome

    1999-01-01

    The concept of maintenance in one industrial system usually represents a sum of constructions and rules that point out to several facts: 1) over which technical system the maintenance should be applied, 2) when it should be applied and 3) on which way it should be organized. In our real industrial systems the contemporary maintenance of the technical systems is not enough. Also, other contemporary measures whose basic task is to prevent unplanned stoppages as well as damages in the production process are insufficient. The equipment of the technical systems with devices for permanent monitoring of the condition, in other words with devices for technical diagnostic is unsatisfactorily, with a small exemption of the devices for vibration diagnostic monitoring of the condition in real time. The tribological diagnostics, using the procedures and methods without destroying as well as measuring and monitoring the condition of the lubrication devices, allows to find out the real status of the technical systems in operation. On that basic it is possible to undertake correct maintenance measures which would provide promising and safe operation of the technical systems. (Author)

  19. Maintenance care in chiropractic - what do we know?

    DEFF Research Database (Denmark)

    Leboeuf-Yde, Charlotte; Hestbæk, Lise

    2008-01-01

    of maintenance care are considered controversial. It is therefore relevant to investigate the scientific evidence forming the basis for its use. OBJECTIVES: A review of the literature was performed in order to obtain answers to the following questions: What is the exact definition of maintenance care, what...... any of the questions. CONCLUSION: There is no evidence-based definition of maintenance care and the indications for and nature of its use remains to be clearly stated. It is likely that many chiropractors believe in the usefulness of maintenance care but it seems to be less well accepted...

  20. [The maintenance of automatic analysers and associated documentation].

    Science.gov (United States)

    Adjidé, V; Fournier, P; Vassault, A

    2010-12-01

    The maintenance of automatic analysers and associated documentation taking part in the requirements of the ISO 15189 Standard and the French regulation as well have to be defined in the laboratory policy. The management of the periodic maintenance and documentation shall be implemented and fulfilled. The organisation of corrective maintenance has to be managed to avoid interruption of the task of the laboratory. The different recommendations concern the identification of materials including automatic analysers, the environmental conditions to take into account, the documentation provided by the manufacturer and documents prepared by the laboratory including procedures for maintenance.

  1. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  2. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  3. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  4. Analyse of Maintenance Cost in ST

    CERN Document Server

    Jenssen, B W

    2001-01-01

    An analyse has been carried out in ST concerning the total costs for the division. Even though the target was the maintenance costs in ST, the global budget over has been analysed. This has been done since there is close relation between investments & consolidation and the required level for maintenance. The purpose of the analyse was to focus on maintenance cost in ST as a ratio of total maintenance costs over the replacement value of the equipment, and to make some comparisons with other industries and laboratories. Families of equipment have been defined and their corresponding ratios calculated. This first approach gives us some "quantitative" measurements. This analyse should be combined with performance indicators (more "qualitative" measurements) that are telling us how well we are performing. This will help us in defending our budget, make better priorities, and we will satisfy the requirements from our external auditors.

  5. Large remote manipulator operating and maintenance experience at IEM cell

    International Nuclear Information System (INIS)

    Hicks, D.F.; McGuinness, P.W.

    1985-01-01

    The Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) has two large Electro-Mechanical Manipulators (EMM's). These manipulators are used for cell operations (processing of reactor core components) as well as general cell maintenance. From our eleven years of operation and maintenance experience with these large EMM's, we have learned many lessons concerning manipulator design. This paper describes the IEM Cell EMM design features and discusses operating and maintenance experience at the IEM Cell

  6. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  7. Integrated maintenance management model in the printing industry

    Directory of Open Access Journals (Sweden)

    Csaba Horváth

    2010-09-01

    Full Text Available Rapid technological and economic changes are setting radically new task for maintenance divisions of printingworks. In this dissertation the author provides a summary on the possible approaches for the adoption to the newrequirements. He formulates his situation analysis based on an exhaustive questionnaire survey, and points out thecurrents of changes and challenges caused by the expected developments in the maintenance field of the printingindustry.Based on the possible answers on these challenges, the Author has compiled a - yet missing - maintenance managementmodel that encompasses the maintenance specialties of the industry, as well as the professional heritage andthe latest scientific accomplishments in the discipline of maintenance.The model is based on the widely accepted quality focused maintenance approach, that is supplemented by theAuthor with four new aspects - 1 reliability-focused culture, 2 quality management system, 3 employment ofexternal service provides, 4 maintenance characteristics specific to printing machinery - determining their effectsand integrating them into one single system.In order to construct the model, the Author develops specific solutions that can be seen as own scientific achievementson the specification of maintenance characteristics of printing machinery; on the efficiency improving applicationsof quality management systems, modern knowledge management and reliability focused corporate culture;and on the implementation of a maintenance information system.

  8. Modernizing international maintenance obligations in Serbia

    Directory of Open Access Journals (Sweden)

    Bordaš Bernadet

    2013-01-01

    Full Text Available The paper deals with the modernization of private international law of maintenance in Serbia in the light of the two newest international instruments drawn up by the Hague Conference on Private International Law. As Serbia has ratified the Hague Protocol on the Law Applicable to Maintenance Obligations in January 2013 introducing modern rules to the legal system of Serbia, the issue of ratification of the Hague Convention on the International Recovery of Child Support and Other Forms of Family Maintenance has arisen, in order to modernize this aspect of the international maintenance as well. In order to establish a position on the issue, the paper presents and analyzes the essential provisions of the Convention (scope of application, administrative cooperation, recognition and enforcement of decisions, stricto sensu enforcement. Based on the analyses, the concluding remarks offers some elements on the bases of which the competent authorities could form an opinion on the necessity and desirability of the ratification of the Convention.

  9. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  10. Forecasts of the Maintenance Activity

    Directory of Open Access Journals (Sweden)

    Marius Romocea

    2017-11-01

    Full Text Available Enhancing the machines’ technical and technological performance through constructive improvements that allow for the automation of orders, contributes to the increasing of the production capacity of the system and for maintaining an optimal level of product costs. In order to achieve these goals, it is necessary to organize the maintenance work well, in order to quickly diagnose the malfunctions and to shorten the repair time. Given the scale of the phenomena, this paper seeks to answer two questions, namely: how will be the maintenance in future and also how to prepare this activity.

  11. Different Transportation and Maintenance Strategies for Offshore Wind Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    as different maintenance strategies are considered. The report contains a case study where the presented approach is applied to a wind turbine farm and a sensitivity study of the different parameters like the operational range of the boat/helicopter, the electricity price, real rate of interest, inspection......Inspections as well as transportation of personnel and repair parts are a significant contributor to the levelized cost of energy for offshore wind turbines. There are different operation and maintenance (O&M) strategies for offshore wind turbines. Maintenance can be performed preventively...... of energy using different maintenance and transportation strategies....

  12. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  13. Status of Technical Requirements Development for Maintenance Effectiveness Management

    International Nuclear Information System (INIS)

    Ahn, Sang Kyu; Kim, Yun Il; Lee, Chang Ju; Chang, Gun Hyun

    2012-01-01

    It is well known that proper maintenance at nuclear power plant is essential to plant safety and that there is a clear link between effective maintenance and safety as it relates to such factors as the number of transients and challenges to safety systems and the associated need for operability, availability, and reliability of safety equipment. Good maintenance is also important in providing assurance that failures of non-safety related structures, systems, and components (SSCs) that could initiate, adversely affect, or mitigate a transient or an accident are also minimized. Maintenance is also important to ensure that design assumptions and margins in the original design basis are maintained and are not degraded to an unacceptable level. Therefore, good maintenance practice at nuclear power plants is of utmost importance in protecting public health and safety. This paper introduces the status of the development of regulatory technical requirements (Drafts) for utility's management of maintenance effectiveness. The process of Maintenance Effectiveness Management is shown in Figure 1

  14. Reducing maintenance costs

    International Nuclear Information System (INIS)

    Zaiss, W.; Reuschle, K.; Baier, B.

    2002-01-01

    The increasingly more expensive maintenance measures, cuts in the cost budget, and the loss of know-how on the part of vendors all require a change of policy with respect to maintenance concepts of the part of operators. This also applies to the existing valve concepts, the drives included. Under these aspects, the current drive, which is self-actuated and actuated by outside media, for a parallel-plate valve of a nomial width of 700 was reconsidered. The effort served to reduce maintenance costs and, at the same time, simplify the drive concept as well as cut back on the number of in-service inspections. Moreover, the number of active components were to be minimized and installation conditions in the plant were to be improved. When the boundary conditions to be observed with respect to process technology had been laid down, the competent technical department developed a concept of modification of the drive. A major constituent part was the demonstration of the functioning capability of the new drive under accident conditions. It was achieved mainly by an analytical approach. In the resultant drive concept, the same control valves are employed to actuate a driving cylinder by means of self-actuation or by an outside medium as a function of pressure. (orig.) [de

  15. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  16. TRUPACT-II container maintenance program plan

    International Nuclear Information System (INIS)

    1990-01-01

    This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container

  17. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  18. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  19. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  20. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  1. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  2. Remote maintenance challenges presented in the ITER engineering design

    International Nuclear Information System (INIS)

    Burgess, T.W.; Herndon, J.N.; Schrock, S.L.; Lousteau, D.C.

    1995-01-01

    Leading fusion energy research institutions are currently engaged in the Engineering Design Activity for the International Thermonuclear Experimental Reactor (ITER). A tokamak reactor design is evolving which emphasizes high system performance in a minimum overall reactor and building size. The resulting high component density dictates careful attention to ITER remote maintenance considerations in the development of the configuration. The complexity and scale of ITER remote maintenance tasks are well beyond the scope of today's experience and technology. This paper discusses the remote maintenance philosophy, describes the basic configuration as it relates to maintenance, and describes the basic procedures and equipment required. Key enabling technology research and development needs are also addressed

  3. Essential Approach of Maintenance Management System of Office Building

    Directory of Open Access Journals (Sweden)

    Masyatul Husna Othman

    2013-09-01

    Full Text Available Buildings will be worn-out, dilapidated and dirty as time goes by; but with good maintenance management we can at least prolong the lifespan of building longer as well as provide the building services and keep the building performance at it ultimate level. The importance of carrying out a systematic and routine maintenance works as part of works to conserve building performance is often neglected due to various factors including due to misunderstanding on the needs of the maintenance works itself and budget allocated. Thus, the purpose of the present study was to evaluating the level of maintenance management and quality of services in office buildings. This study also sought to answer the following question to determine the basic approach of maintenance management system used for office buildings.

  4. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Rose, Jeremy

    2014-01-01

    Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...... is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus...... on benefits. In an action research project at Aveva in Denmark we assisted with the optimisation of SCRUM, tailoring the standard process to the immediate needs of the developers. We draw on both theoretical and empirical learning to formulate nine heuristics for maintenance practitioners wishing to go agile....

  5. Determination of Pareto frontier in multi-objective maintenance optimization

    International Nuclear Information System (INIS)

    Certa, Antonella; Galante, Giacomo; Lupo, Toni; Passannanti, Gianfranco

    2011-01-01

    The objective of a maintenance policy generally is the global maintenance cost minimization that involves not only the direct costs for both the maintenance actions and the spare parts, but also those ones due to the system stop for preventive maintenance and the downtime for failure. For some operating systems, the failure event can be dangerous so that they are asked to operate assuring a very high reliability level between two consecutive fixed stops. The present paper attempts to individuate the set of elements on which performing maintenance actions so that the system can assure the required reliability level until the next fixed stop for maintenance, minimizing both the global maintenance cost and the total maintenance time. In order to solve the previous constrained multi-objective optimization problem, an effective approach is proposed to obtain the best solutions (that is the Pareto optimal frontier) among which the decision maker will choose the more suitable one. As well known, describing the whole Pareto optimal frontier generally is a troublesome task. The paper proposes an algorithm able to rapidly overcome this problem and its effectiveness is shown by an application to a case study regarding a complex series-parallel system.

  6. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  7. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  8. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  9. Annual report of the maintenance division for 1965

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-12-01

    The personnel of the Division is organized in groups, each responsible for a number of tasks related to maintenance of reactor mechanical structures, electric equipment, electronic equipment. According to the action plan for 1965 the division for RA reactor maintenance the main activities were: planned maintenance of the reactor components, planned repair of the main components, indispensable repairs during reactor operation, repair during planned shutdown periods and tasks related to improvement of operation components and systems. Quite a significant number of failures was related to electronic equipment resulting from failures of thermometers in the heavy water system due to vibrations of the pumps. A number of spare parts and tools were produced needed for maintenance of reactor components, as well as instruments for control and calibration of reactor measuring devices [sr

  10. Costs of Stream Maintenance Works in the Poznań District

    Directory of Open Access Journals (Sweden)

    Piotr Stachowski

    2017-12-01

    Full Text Available Water reclamation works, especially those related to stream maintenance, are necessary wherever their lack may cause a risk to the natural environment, as well as human life and property. This paper presents the assessment of the maintenance costs on natural and regulated streams in the years 2010-2016 in the Poznań district. In the analysed years, the costs for works on streams and water-drainage constructions amounted to an average of 1,214,800 PLN per year, which in terms of a 1km stream is approximately 3,575 PLN/km per year. Higher maintenance costs occurred on the regulated streams, where the average cost of a 1 km stream was approximately 7,042 PLN. Moreover, high costs were noted in the works on unregulated streams, where the average cost was approximately 8,948 PLN. The amount of public funding for the maintenance and current operation was quite insufficient, as it covered only 4.2% of the annual average demand. The positive trend is nearly a 6-fold increase in funds for current maintenance compared to the year 2010, when a flood occurred. The results of the conducted analyses indicate the cognitive need and purpose, as well as the economic importance, to establish water reclamation monitoring, as well as develop the existing IT system for recording water reclamation works and water management in agriculture.

  11. Predictors of children's sleep onset and maintenance problems after road traffic accidents.

    Science.gov (United States)

    Wittmann, Lutz; Zehnder, Daniel; Jenni, Oskar G; Landolt, Markus A

    2012-01-01

    Sleep onset and maintenance problems are a frequent complaint after traumatic events in children. However, the association of traumatic experiences and disturbed sleep remains to be explained. To examine the incidence of sleep onset and maintenance problems in children after road traffic accidents and identify potential predictors of sleep onset and maintenance problems, including putative psychopathological mechanisms as well as stressors affecting the family system. In 33 children treated for injuries after road traffic accidents, sleep and measures of psychopathology were assessed 10 days, 2 months, and 6 months after hospital admission. The predictive value of four clusters of predictor variables for children's sleep onset and maintenance problems was prospectively tested by multiple regression analyses. These clusters included socio-demographic, injury- and accident-related, and psychopathological variable clusters as well as factors reflecting stressors concerning mothers and family. Children suffering from posttraumatic stress reported a prolonged subjective sleep latency. The severity of sleep onset and maintenance problems was predicted by female sex and the child's as well as mothers' posttraumatic stress disorder (PTSD) severity. Sleep onset and maintenance problems in children after trauma appear to result from a complex interaction of multiple factors. Our findings support the transactional model of sleep-wake regulation that bears implications for the development of adequate intervention strategies.

  12. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  13. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  14. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  15. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  16. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  17. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  18. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  19. TRUPACT-II Container Maintenance Program Plan

    International Nuclear Information System (INIS)

    1991-05-01

    This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers

  20. Field maintenance of radiation-shielding windows at HFEF

    International Nuclear Information System (INIS)

    Tobias, D.A.

    1983-01-01

    The achievement of excellent viewing through hot-cell shielding windows does not occur by chance. Instead, it requires a well planned and executed program of field maintenance. The lack of such a program is a major factor when a hot-cell facility has poor window viewing. At HFEF, all preventive maintenance is performed by one group of trained technical-support personnel under the immediate direction of a Systems Engineer, who has responsibility for the shielding windows. Window maintenance is prescheduled and recorded by being incorporated into the computerized Maintenance Data System (MDS). Measurements of window light transmission are scheduled annually to determine glass browning or oil cloudiness conditions within the window tank. The tank oil is sampled and chemically analyzed annually to determine the moisture content, the acidity, and the probable deterioration rate caused by irradiation

  1. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  2. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    Science.gov (United States)

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  3. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  4. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  5. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  6. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  7. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  8. Optimization of maintenance policy using the proportional hazard model

    Energy Technology Data Exchange (ETDEWEB)

    Samrout, M. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: mohamad.el_samrout@utt.fr; Chatelet, E. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: chatelt@utt.fr; Kouta, R. [M3M Laboratory, University of Technology of Belfort Montbeliard (France); Chebbo, N. [Industrial Systems Laboratory, IUT, Lebanese University (Lebanon)

    2009-01-15

    The evolution of system reliability depends on its structure as well as on the evolution of its components reliability. The latter is a function of component age during a system's operating life. Component aging is strongly affected by maintenance activities performed on the system. In this work, we consider two categories of maintenance activities: corrective maintenance (CM) and preventive maintenance (PM). Maintenance actions are characterized by their ability to reduce this age. PM consists of actions applied on components while they are operating, whereas CM actions occur when the component breaks down. In this paper, we expound a new method to integrate the effect of CM while planning for the PM policy. The proportional hazard function was used as a modeling tool for that purpose. Interesting results were obtained when comparison between policies that take into consideration the CM effect and those that do not is established.

  9. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  10. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  11. Selection of maintenance tasks

    Energy Technology Data Exchange (ETDEWEB)

    Dean, B; Rombos, P [Wardrop (W.L.) and Associates Ltd., Winnipeg, MB (Canada)

    1995-10-01

    Two methodologies for maintenance task selection, Reliability Centre Maintenance (RCM) and Degradation Mode Analysis (DMA), are compared with regard to application in the nuclear industry and potential for application at CANDU nuclear power plants. RCM is the favoured one of the two methodologies. It is more thorough than DMA, is well supported within the US nuclear industry, and - with experience in application - is gaining cost effectiveness. There is interest in the use of RCM in other nations, including France and Japan, and it is already being implemented at Bruce A NGS and Bruce B NGS in Canada. DMA lags behind RCM in development and currently there is little experience to support claims of major benefits at reduced cost. Significant advantages over RCM need to be demonstrated if DMA is to gain acceptance in the nuclear industry. (author). 41 refs., 7 tabs., 8 figs.

  12. Selection of maintenance tasks

    International Nuclear Information System (INIS)

    Dean, B.; Rombos, P.

    1995-10-01

    Two methodologies for maintenance task selection, Reliability Centre Maintenance (RCM) and Degradation Mode Analysis (DMA), are compared with regard to application in the nuclear industry and potential for application at CANDU nuclear power plants. RCM is the favoured one of the two methodologies. It is more thorough than DMA, is well supported within the US nuclear industry, and - with experience in application - is gaining cost effectiveness. There is interest in the use of RCM in other nations, including France and Japan, and it is already being implemented at Bruce A NGS and Bruce B NGS in Canada. DMA lags behind RCM in development and currently there is little experience to support claims of major benefits at reduced cost. Significant advantages over RCM need to be demonstrated if DMA is to gain acceptance in the nuclear industry. (author). 41 refs., 7 tabs., 8 figs

  13. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  14. The importance of maintainability in maintenance cost management

    International Nuclear Information System (INIS)

    Allen, R.R.

    1996-01-01

    This paper provides specific examples and results from ongoing projects at Power Plants, and for offshore oil platforms. The paper describes the vital role maintainability has on plant availability. How the application of equipment maintainability principles, if addressed using state of the art computer tools and advanced business processes can bring annual return on investment results as high as 15 to 1. The maintenance process of today and for the future must provide for high plant availability at the lowest possible cost. The high cost of obtaining equipment reliability levels necessary to meet required availability demands has not proved to be sustainable. Therefore new business decision processes that address equipment failures as part of the maintenance process have been developed. Repair costs require that equipment failures be selective and controlled so that a high level of safety and plant availability is assurance. This can only be accomplished by the use of advanced computer tools in the hands of well trained maintenance-engineering specialist. The relationship between Reliability Centered Maintenance (RCM), Condition Directed Planned Maintenance (CDPM), and maintainability is also presented

  15. Managing the maintenance inventory of a cement manufacturer

    Directory of Open Access Journals (Sweden)

    Morne Eloff

    2013-11-01

    Full Text Available Inventory management is a crucial aspect of managing a company successfully. This is even more apparent in the case of maintenance inventories for production equipment, which impact directly on production equipment efficiency. This is a typical inventory management issue for a cement manufacturer that faces the problem of managing its maintenance inventories optimally when certain maintenance items have exceptionally long lead times (100 weeks and values in excess of R500 000. An assessment of the cement manufacturer’s approach to managing its maintenance inventories indicated various shortcomings, which have resulted in a significant level of obsolescence. One approach to managing maintenance inventories efficiently is to implement a classification of the inventory items in terms of their criticality to the cement production process. The critical nature of a component could be established through a risk-based approach (minimisation of the risk of production loss and taking into account the type of maintenance (planned vs unplanned that the component is required for. A risk-based approach should form the basis of the maintenance inventory management of the cement manufacturer as this would allow the cement manufacturer to utilise other inventory management methods effectively. In addition, it is important to ensure that employees are well versed in the different inventory management approaches utilised and that high levels of integration between departments are pursued.

  16. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  17. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  18. Development of support system for maintenance and administration of reprocessing plant equipment

    International Nuclear Information System (INIS)

    Iwasaki, Syogo; Taniguchi, Takayuki; Shiraishi, Yoshihiko; Isaka, Kazuo

    1998-01-01

    Each year, maintenance work is carried out for about 10,000 pieces of equipment, including mechanical devices, electric equipment and instruments, at the Tokai Reprocessing Plant. Ninety percent of such maintenance work is preventive maintenance. In order to manage the information about the maintenance work, a computer support system was developed between 1985 and 1992. Twenty-seven thousand pieces of equipment and 180,000 maintenance histories have already been registered in the system. The system has been used for planning inspections and replacement of equipment as well as checking their maintenance histories. Actual usage of the system has shown that some auxiliary functions need to be added. The system will therefore be improved and extended. (author)

  19. Plant Maintenance. The Licensee's Viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Ungi, T. [Heysham 2 Power Station, Nuclear Electric LTD (United Kingdom)

    1997-07-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  20. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  1. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    OpenAIRE

    Orlando Duran; Andrea Capaldo; Paulo Andrés Duran Acevedo

    2017-01-01

    Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despi...

  2. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  3. On the concept of e-maintenance: Review and current research

    International Nuclear Information System (INIS)

    Muller, Alexandre; Crespo Marquez, Adolfo; Iung, Benoit

    2008-01-01

    The importance of the maintenance function has increased because of its role in keeping and improving system availability and safety, as well as product quality. To support this role, the development of the communication and information technologies has allowed the emergence of the concept of e-maintenance. Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. As we will discuss later in this paper, e-maintenance integrates existing telemaintenance principles, with Web services and modern e-collaboration principles. Collaboration allows to share and exchange not only information but also knowledge and (e)-intelligence. By means of a collaborative environment, pertinent knowledge and intelligence become available and usable at the right place and time, in order to facilitate reaching the best maintenance decisions. This paper outlines the basic ideas within the e-maintenance concept and then provides an overview of the current research and challenges in this emerging field. An underlying objective is to identify the industrial/academic actors involved in the technological, organizational or management issues related to the development of e-maintenance. Today, this heterogeneous community has to be federated in order to bring up e-maintenance as a new scientific discipline

  4. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  5. JIT maintenance improves the productivity and energy efficiency of the system

    Directory of Open Access Journals (Sweden)

    Marković Željko M.

    2016-01-01

    Full Text Available Maintenance planning in order to ensure the smooth functioning of the system, optimal interaction of system with the environment, and timely responses to the set requirements is one of the most important internal resources of the organization. Just-In-Time Maintenance enables rarely downtime and lower maintenance costs throughout the life cycle of the system, and dramatically increases the productivity and energy efficiency of the entire system. By adopting of the Just-In-Time Maintenance philosophy, minimum of objective function of energy or production system, as well as of production of services system, is achieved.

  6. Multi-level predictive maintenance for multi-component systems

    International Nuclear Information System (INIS)

    Nguyen, Kim-Anh; Do, Phuc; Grall, Antoine

    2015-01-01

    In this paper, a novel predictive maintenance policy with multi-level decision-making is proposed for multi-component system with complex structure. The main idea is to propose a decision-making process considered on two levels: system level and component one. The goal of the decision rules at the system level is to address if preventive maintenance actions are needed regarding the predictive reliability of the system. At component level the decision rules aim at identifying optimally a group of several components to be preventively maintained when preventive maintenance is trigged due to the system level decision. Selecting optimal components is based on a cost-based group improvement factor taking into account the predictive reliability of the components, the economic dependencies as well as the location of the components in the system. Moreover, a cost model is developed to find the optimal maintenance decision variables. A 14-component system is finally introduced to illustrate the use and the performance of the proposed predictive maintenance policy. Different sensitivity analysis are also investigated and discussed. Indeed, the proposed policy provides more flexibility in maintenance decision-making for complex structure systems, hence leading to significant profits in terms of maintenance cost when compared with existing policies. - Highlights: • A predictive maintenance policy for complex structure systems is proposed. • Multi-level decision process based on prognostic results is proposed. • A cost-based group importance measure is introduced for decision-making. • Both positive and negative dependencies between components are investigated. • A cost model and Monte Carlo simulation are developed for optimization process.

  7. TRUPACT-II container maintenance program plan

    International Nuclear Information System (INIS)

    1990-11-01

    This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container, in accordance with requirements of the TRUPACT-II Container Operations and Maintenance Manual, OM-134, the TRUPACT-II Container Safety Analysis Report (SARP), and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers

  8. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  9. Nuclear instrument maintenance and technical training in Nuclear Energy Unit

    International Nuclear Information System (INIS)

    Mohamad Nasir Abdul Wahid

    1987-01-01

    Instrument maintenance service is a necessity in a Nuclear Research Institute, such as the Nuclear Energy Unit (NEU) to ensure the smooth running of our research activities. However, realising that maintenance back-up service for either nuclear or other scientific equipment is a major problem in developing countries such as Malaysia, NEU has set up an Instrumentation and Control Department to assist in rectifying the maintenance problem. Beside supporting in house activities in NEU, the Instrumentation and Control Department (I and C) is also geared into providing services to other organisations in Malaysia. This paper will briefly outline the activities of NEU in nuclear instrument maintenance as well as in technical training. (author)

  10. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  11. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  12. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  13. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  14. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  15. Practical considerations in developing an instrument-maintenance plan--

    International Nuclear Information System (INIS)

    Guth, M.A.S.

    1989-01-01

    The author develops a general set of considerations to explain how a consistent, well-organized, prioritized, and adequate time-allowance program plan for routine maintenance can be constructed. The analysis is supplemented with experience from the high flux isotope reactor (HFIR) at US Oak Ridge National Laboratory (ORNL). After the preventive maintenance (PM) problem was defined, the instruments on the schedule were selected based on the manufacturer's design specifications, quality-assurance requirements, prior classifications, experiences with the incidence of breakdowns or calibration, and dependencies among instruments. The effects of repair error in PM should be also studied. The HFIR requires three full-time technicians to perform both PM and unscheduled maintenance. A review is presented of concepts from queuing theory to determine anticipated breakdown patterns. In practice, the pneumatic instruments have a much longer lifetime than the electric/electronic instruments on various reactors at ORNL. Some special considerations and risk aversion in choosing a maintenance schedule

  16. Evaluation of Maintenance Management in Iraqi Governmental Buildings

    Directory of Open Access Journals (Sweden)

    Qasim Mohammed Doos

    2016-09-01

    Full Text Available Impact of buildings in Iraq and other countries on the environment is obvious; this problem began to take scientific and humanitarian dimensions in order to reduce and eliminate this problem. This impact can be seen through the energy, water and raw materials consumed for the establishment, operation and maintenance of these buildings, as well as the emissions of hazardous gases and generations of solid wastes. This work was conducted to assess the current maintenance managerial practice for the governmental buildings to stand on the main obstacle and extrapolation of measures by means of interviews with experts to determine the effective factors and closed questionnaire to state the features and the need for new building maintenance management system which may assist for modeling new building maintenance management system which may help to reduce the deterioration levels of governmental buildings and the emission of hazardous gases and solid waste with cost efficient approach.

  17. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  18. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  19. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  20. Telomeres and viruses: common themes of genome maintenance

    Science.gov (United States)

    Deng, Zhong; Wang, Zhuo; Lieberman, Paul M.

    2012-01-01

    Genome maintenance mechanisms actively suppress genetic instability associated with cancer and aging. Some viruses provoke genetic instability by subverting the host’s control of genome maintenance. Viruses have their own specialized strategies for genome maintenance, which can mimic and modify host cell processes. Here, we review some of the common features of genome maintenance utilized by viruses and host chromosomes, with a particular focus on terminal repeat (TR) elements. The TRs of cellular chromosomes, better known as telomeres, have well-established roles in cellular chromosome stability. Cellular telomeres are themselves maintained by viral-like mechanisms, including self-propagation by reverse transcription, recombination, and retrotransposition. Viral TR elements, like cellular telomeres, are essential for viral genome stability and propagation. We review the structure and function of viral repeat elements and discuss how they may share telomere-like structures and genome protection functions. We consider how viral infections modulate telomere regulatory factors for viral repurposing and can alter normal host telomere structure and chromosome stability. Understanding the common strategies of viral and cellular genome maintenance may provide new insights into viral–host interactions and the mechanisms driving genetic instability in cancer. PMID:23293769

  1. A framework for reliability and risk centered maintenance

    International Nuclear Information System (INIS)

    Selvik, J.T.; Aven, T.

    2011-01-01

    Reliability centered maintenance (RCM) is a well-established analysis method for preventive maintenance planning. As its name indicates, reliability is the main point of reference for the planning, but consequences of failures are also assessed. However, uncertainties and risk are to a limited extent addressed by the RCM method, and in this paper we suggest an extension of the RCM to reliability and risk centered maintenance (RRCM) by also considering risk as the reference for the analysis in addition to reliability. A broad perspective on risk is adopted where uncertainties are the main component of risk in addition to possible events and associated consequences. A case from the offshore oil and gas industry is presented to illustrate and discuss the suggested approach.

  2. Alternatives to lithium and divalproex in the maintenance treatment of bipolar disorder.

    Science.gov (United States)

    Gnanadesikan, Mukund; Freeman, Marlene P; Gelenberg, Alan J

    2003-06-01

    The role of lithium carbonate in the maintenance treatment of bipolar disorder is well established. Unfortunately, many patients fail to respond adequately to this agent or are unable to tolerate its adverse effects. Divalproex has become a commonly used alternative to lithium, but it also is ineffective or poorly tolerated in many patients. This article attempts to review the available data on maintenance therapy in bipolar disorder with a variety of anticonvulsants and antipsychotics (both conventional and novel), with reference to relevant studies in acute mania and bipolar depression as well. Evidence on maintenance therapy and relevant acute-phase data were collected using MEDLINE database searches. Data on maintenance therapy with agents other than lithium and divalproex are sparse, and often derived from open, uncontrolled studies. Implications and flaws of available data are discussed. Other than lithium, there are few robust double-blind data to support the use of a variety of agents in the maintenance phase. However, uncontrolled data suggest that a number of agents merit further study.

  3. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  4. Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

    Directory of Open Access Journals (Sweden)

    Farhana Omar Mardhiah

    2017-01-01

    Full Text Available Effectiveness of management in maintenance aspect holds the key element in influencing the performance of overall maintenance management. Similarly, public hospital building needs an effective maintenance management as this type of building in nature is one of the most complex issues in the field of maintenance. Improper building maintenance management adopted by the organization significantly will interrupt the overall operation of the building. Therefore, this paper is aim to identifying the key performance indicator (KPI of effectiveness of maintenance management for the public hospital building. A total of 32 set of questionnaires were distributed to the maintenance manager for each hospital in the northern region of peninsular Malaysia by using self-administration strategy. The survey answer was analyzed by performing descriptive analysis in SPSS. Overall, the result of descriptive analysis shows that all the ten factors of effectiveness of maintenance management are accepted as KPI since the mean value is at least 3.93 which classified as important and significant. The most significant factor of effectiveness of maintenance management is task planning and scheduling with the mean score of 4.35. While less significant factor is identify as maintenance approach with the value of mean score is 3.93. The both results indicates that the management need to have well-structured planning for the maintenance works and also need to embrace the exact strategy of maintenance approach in order to achieved better overall performance of maintenance management. This study may draw a standard practice for the government in assessing the performance of public facilities in terms of maintenance management.

  5. Optimisation oriented lean six sigma development for maintenance management in service sector

    OpenAIRE

    Alsubaie, Barrak Hamdan

    2016-01-01

    This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University London This research deals with the optimization of preventive maintenance (PM) and process improvement for maintenance management in service sector. To stay competitive and sustain long-term profitability, process improvement methodologies have become strategically important for maintenance management in recent years. These include well-known approaches such as Total Quality Management (TQ...

  6. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  7. A study on maintenance rule program and its application at Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  8. A study on maintenance rule program and its application at Korean NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project.

  9. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  10. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  11. Surface mining machines problems of maintenance and modernization

    CERN Document Server

    Rusiński, Eugeniusz; Moczko, Przemysław; Pietrusiak, Damian

    2017-01-01

    This unique volume imparts practical information on the operation, maintenance, and modernization of heavy performance machines such as lignite mine machines, bucket wheel excavators, and spreaders. Problems of large scale machines (mega machines) are highly specific and not well recognized in the common mechanical engineering environment. Prof. Rusiński and his co-authors identify solutions that increase the durability of these machines as well as discuss methods of failure analysis and technical condition assessment procedures. "Surface Mining Machines: Problems in Maintenance and Modernization" stands as a much-needed guidebook for engineers facing the particular challenges of heavy performance machines and offers a distinct and interesting demonstration of scale-up issues for researchers and scientists from across the fields of machine design and mechanical engineering.

  12. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  13. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  14. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  15. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  16. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  17. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  18. TPM and autonomous maintenance: case study in a metal mechanic company

    Directory of Open Access Journals (Sweden)

    Norberto Carvalho Biehl

    2015-12-01

    Full Text Available The purpose of this article was to describe a case of autonomous maintenance implementation in a pilot area of a metal mechanical industry company. The TPM – Total Productive Maintenance is a managerial technology that can help companies to reduce failures and breakages of machines. One of the most important issues of TPM is autonomous maintenance. The method of research was the case study. A program of twelve points was structured and adopted as stand-alone maintenance deployment guide. The program began in a pilot area, including three machining centers. The main results of the pilot program were: increasing by more than 700% the Mean Time between Failure, reducing by more than 40% in the Mean Time to Repair, as well as the consequent increase of more than five percentage points on the availability of the three machines and almost 60% reduction in the cost of maintenance materials. The main conclusion was that the TPM, and in particular the autonomous maintenance, can increase the efficiency of maintenance as strategic factor, which enhances the competitiveness of manufacturing in industrial companies.

  19. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  20. Mechanical Intervention for Maintenance of Cartilage and Bone

    Directory of Open Access Journals (Sweden)

    Hui B. Sun

    2011-01-01

    Full Text Available Mechanical loading provides indispensible stimuli for growth and development of the articular cartilage and bone. Interestingly, depending on loading conditions loads applied to the joint can be beneficial as well as harmful to skeletal maintenance and remodeling. Moderate loads to the synovial joint, for instance, suppress the expression levels of matrix metallproteinases (MMPs, while loads above a threshold tend to increase their destructive activities. This report focuses on two recently developed loading modalities from animal studies, joint motion and joint loading. Their unique characteristics and potential usages for maintenance of the articular cartilage and stimulation of bone remodeling are reviewed. Also described are biophysical and molecular mechanisms which likely are responsible for the load-driven maintenance of cartilage and bone, and a possibility of developing load-mediated treatments of osteoporosis and osteoarthritis.

  1. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  2. Nuclear power plant maintenance scheduling dilemma: a genetic algorithm approach

    International Nuclear Information System (INIS)

    Mahdavi, M.H.; Modarres, M.

    2004-01-01

    There are huge numbers of components scheduled for maintenance when a nuclear power plant is shut down. Among these components, a number of them are safety related which their operability as well as reliability when plant becomes up is main concerns. Not performing proper maintenance on this class of components/system would impose substantial risk on operating the NPP. In this paper a new approach based on genetic algorithms is presented to optimize the NPP maintenance schedule during shutdown. following this approach the cost incurred by maintenance activities for each schedule is balanced with the risk imposed by the maintenance scheduling plan to the plant operation status when it is up. The risk model implemented in the GA scheduler as its evaluation function is developed on the basis of the probabilistic risk assessment methodology. the Ga optimizers itself is shown to be superior compared to other optimization methods such as the monte carlo technique

  3. Overview of maintenance principles and regulatory supervision of maintenance activities at nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Rohar, S.; Cepcek, S.

    1997-01-01

    The maintenance represents one of the most important tools to ensure safe and reliable operation of nuclear power plants. The emphasis of Nuclear Regulatory Authority of the Slovak Republic to the maintenance issue is expressed by requirements in the regulations. The current practice of maintenance management in operated nuclear power plants in Slovak Republic is presented. Main aspects of maintenance, as maintenance programme, organization of maintenance, responsibilities for maintenance are described. Activities of nuclear regulatory authority in maintenance process are presented too. (author)

  4. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  5. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    Directory of Open Access Journals (Sweden)

    Feng Qiang

    2014-04-01

    Full Text Available A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance process is described as a 3-layer multi-agent system (MAS model. A communication and reasoning strategy among the agents is put forward. A fleet maintenance personnel configuration algorithm is proposed based on contract net protocol (CNP. Finally, a fleet of 10 aircraft is studied for verification purposes. A mission type with 3 waves of continuous dispatch is imaged. Compared with the traditional methods that can just provide configuration results, the proposed method can provide optimal maintenance strategies as well.

  6. Development of maintenance knowledge management system for power plant

    International Nuclear Information System (INIS)

    Ohi, Tadashi; Hirai, Kenji

    2004-01-01

    This paper describes the knowledge management framework to systematize maintenance knowledge in power plant. The features of the framework are (1) to construct a decision tree of trouble cases incrementally based on Ripple Down Rules (RDR) method and (2) to decide the timing of installing new knowledge based on several metrics obtained by evaluating a structure of a decision tree. We are developing the experimental prototype of maintenance knowledge management system. The system is integrated with plant database (ex. the operation journals and maintenance records). The management of trouble cases is based on the format of XML. For practical purpose, each trouble case is linked with related data (ex. maintenance manuals, equipment configuration, records). Plant workers can easily search for maintenance knowledge and relevant data by specifying observed status. On the other hand, knowledge engineers can monitor occurrence counts of exceptional cases to each node. The metrics calculation gives a cue to locate the effective node for improving the efficiency of retrieval. We are evaluating the functionality and the effectiveness of the system through the application to maintenance work of controller systems. We believe that this framework will be helpful to share common knowledge among plant sites as well as to manage site-specific knowledge. (author)

  7. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  8. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    of maintenance care. Previous studies have identified chiropractors' choices of case management strategies in response to different case scenarios. However, the rationale for these management strategies is not known. In other words, when presented with both the case, and different management strategies......Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use......, there was consensus on how to match these, but if only the management strategies were provided, would chiropractors be able to define the cases to fit these strategies? The objective with this study was to investigate if there is a common pattern in Finnish chiropractors' case management of patients with low back...

  9. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  10. Proactive materials aging management and multi-layered maintenance

    International Nuclear Information System (INIS)

    Shoji, Tetsuo

    2009-01-01

    Long term operation of NPP has been receiving a great concern based upon the plant operation experiences and progressive improvement in countermeasures and mitigations. At the same time of this LTO movement, proactive materials aging management is also receiving a great concern to realize the LTO in NPP. Recent PMDM activities in Japan as well as some international one are reviewed and a necessity of an international cooperation is emphasized in relation to reliable maintenance performance connected from the top of the organization to operators and maintenance engineers at plant sites. (author)

  11. Data management in maintenance outsourcing

    International Nuclear Information System (INIS)

    Murthy, D.N.P.; Karim, M.R.; Ahmadi, A.

    2015-01-01

    Most businesses view maintenance as tasks carried out by technicians and the data collected is mostly cost related. There is a growing trend towards outsourcing of maintenance and the data collection issues are not addressed properly in most maintenance service contracts. Effective maintenance management requires proper data management - data collection and analysis for decision-making. This requires a proper framework and when maintenance is outsourced it raises several issues and challenges. The paper develops a framework for data management when maintenance is outsourced and looks at a real case study that highlights the need for proper data management. - Highlights: • Framework for data management in maintenance outsourcing. • Black-box to grey-box approaches for modelling. • Improvements to maintenance decision-making. • Case study to illustrate the approaches and the shortcomings in data collection

  12. Geometric Process-Based Maintenance and Optimization Strategy for the Energy Storage Batteries

    Directory of Open Access Journals (Sweden)

    Yan Li

    2016-01-01

    Full Text Available Renewable energy is critical for improving energy structure and reducing environment pollution. But its strong fluctuation and randomness have a serious effect on the stability of the microgrid without the coordination of the energy storage batteries. The main factors that influence the development of the energy storage system are the lack of valid operation and maintenance management as well as the cost control. By analyzing the typical characteristics of the energy storage batteries in their life cycle, the geometric process-based model including the deteriorating system and the improving system is firstly built for describing the operation process, the preventive maintenance process, and the corrective maintenance process. In addition, this paper proposes an optimized management strategy, which aims to minimize the long-run average cost of the energy storage batteries by defining the time interval of the detection and preventive maintenance process as well as the optimal corrective maintenance times, subjected to the state of health and the reliability conditions. The simulation is taken under the built model by applying the proposed energy storage batteries’ optimized management strategy, which verifies the effectiveness and applicability of the management strategy, denoting its obvious practicality on the current application.

  13. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  14. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength and stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation

  15. Maintenance cost avoidance through comprehensive condition monitoring

    International Nuclear Information System (INIS)

    Miller, G.P.; McClymonds, S.L.

    1990-01-01

    Condition monitoring, the measurement and trending of a critical parameter for predictive maintenance, has reached new levels of acceptance and application within the utility and manufacturing industry. Commercially available systems extend well beyond traditional vibration-monitoring systems to include such areas as online wear, crack and leak detection, and stress monitoring. The challenge facing industry is to integrate the information generated from condition monitoring. Current studies indicate that the effectiveness of predictive maintenance depends much more on the program that is established to apply the monitoring techniques than on the monitoring equipment itself. This paper presents a five-phase approach to developing a condition monitoring program

  16. Maintenance of nuclear medicine instruments

    Energy Technology Data Exchange (ETDEWEB)

    Ambro, P

    1993-12-31

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment 1 fig., 1 tab

  17. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  18. Maintenance of nuclear medicine instruments

    International Nuclear Information System (INIS)

    Ambro, P.

    1992-01-01

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment

  19. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  20. Optimisation of maintenance and inspection work in nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, V.

    1996-01-01

    The long-term planning and comparative evaluation of inspection and maintenance intervals as well as results of electric components and machinery have to be intensified in order to shorten maintenance shut-down periods, e.g. of the Grohnde reactor station, thus improving the availability of the plant and the specific electricity generation cost. Economically efficient maintenance has to be based on an efficient organisational structure. Outsourcing of less plant-specific work and tasks offers the possibility for in-house personnel to concentrate on their core competences. All the measures discussed contribute to improving the economic efficiency of the nuclear power plants. (orig./DG) [de

  1. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  2. Schwann Cells in Neuromuscular Junction Formation and Maintenance.

    Science.gov (United States)

    Barik, Arnab; Li, Lei; Sathyamurthy, Anupama; Xiong, Wen-Cheng; Mei, Lin

    2016-09-21

    The neuromuscular junction (NMJ) is a tripartite synapse that is formed by motor nerve terminals, postjunctional muscle membranes, and terminal Schwann cells (TSCs) that cover the nerve-muscle contact. NMJ formation requires intimate communications among the three different components. Unlike nerve-muscle interaction, which has been well characterized, less is known about the role of SCs in NMJ formation and maintenance. We show that SCs in mice lead nerve terminals to prepatterned AChRs. Ablating SCs at E8.5 (i.e., prior nerve arrival at the clusters) had little effect on aneural AChR clusters at E13.5, suggesting that SCs may not be necessary for aneural clusters. SC ablation at E12.5, a time when phrenic nerves approach muscle fibers, resulted in smaller and fewer nerve-induced AChR clusters; however, SC ablation at E15.5 reduced AChR cluster size but had no effect on cluster density, suggesting that SCs are involved in AChR cluster maturation. Miniature endplate potential amplitude, but not frequency, was reduced when SCs were ablated at E15.5, suggesting that postsynaptic alterations may occur ahead of presynaptic deficits. Finally, ablation of SCs at P30, after NMJ maturation, led to NMJ fragmentation and neuromuscular transmission deficits. Miniature endplate potential amplitude was reduced 3 d after SC ablation, but both amplitude and frequency were reduced 6 d after. Together, these results indicate that SCs are not only required for NMJ formation, but also necessary for its maintenance; and postsynaptic function and structure appeared to be more sensitive to SC ablation. Neuromuscular junctions (NMJs) are critical for survival and daily functioning. Defects in NMJ formation during development or maintenance in adulthood result in debilitating neuromuscular disorders. The role of Schwann cells (SCs) in NMJ formation and maintenance was not well understood. We genetically ablated SCs during development and after NMJ formation to investigate the consequences

  3. Computerization of operation and maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs

  4. Computerization of operation and maintenance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs.

  5. A study on autonomous maintenance robot, 7

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Hosokai, Hidemi; Shimasaka, Naoki; Kaneshige, Masanori; Iwasaki, Shinnosuke.

    1990-01-01

    This paper deals with the new mechanism of a new maintenance robot, Mark IV, following the previous reports on pipeline inspection and maintenance robots of Mark I, II, and III. The Mark IV has a mechanism capable of inspecting surfaces of storage tanks as well as pipeline outer surfaces, which is another capability of the maintenance robots, different from the previous ones. The main features of Mark IV are as follows, (i) The robot has a multijoint structure, so that it has better adaptability to the curvartures of pipelines and storage tanks. (ii) The joint of the robot has SMA actuators to make the robot lighter in weight. Some actuator shape characteristics are also examined for the robot structure and control. (iii) The robot has suckers at both ends so that the robot can climb up along the wall from the ground. (iv) A robot with the inch worm mechanisms has many functional motions, such that it can pass over flanges and T-joints, and transfer to adjacent pipelines with a wider range of pipe diameters. (v) A control method is given for the mobile motion control. Thus, the functional level of the maintenance robot has been greatly improved by the introduction of the Mark IV robot. (author)

  6. Improving Minuteman III Maintenance Concepts

    Science.gov (United States)

    2017-03-23

    the ground . Then figure out what your challenges are. We’ll have those” (Pappalardo, 2011). Another challenge facing the maintenance personnel...as assets aged as indicated by the pattern ‘B’ shown in Figure 2. With the increase in the mechanization of processes, more attention has been...concepts could be applied to the sustainment of the MM III as well as benefit its planned replacement, the Ground Based Strategic Deterrent (GBDS

  7. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  8. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  9. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  10. 23 CFR 633.208 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... responsibility of the State. The State may arrange for maintenance of such roads or portions thereof, by... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 633.208 Section 633.208 Highways FEDERAL... PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.208 Maintenance. Maintenance of all highway...

  11. Reliability and risk treatment centered maintenance

    International Nuclear Information System (INIS)

    Pexa, Martin; Hladik, Tomas; Ales, Zdenek; Legat, Vaclav; Muller, Miroslav; Valasek, Petr; Havlu, Vit

    2014-01-01

    We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.

  12. Reliability and risk treatment centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Pexa, Martin; Hladik, Tomas; Ales, Zdenek; Legat, Vaclav; Muller, Miroslav; Valasek, Petr [Czech University of Life Sciences Prague, Kamycka (Czech Republic); Havlu, Vit [Unipetrol A. S, Prague (Czech Republic)

    2014-10-15

    We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.

  13. Maintenance of physical activity in patients with rheumaoid arthritis

    DEFF Research Database (Denmark)

    Løppenthin, Katrine; Esbensen, Bente Appel; Østergaard, Mikkel

    2012-01-01

    , described experiences of bodily well-being and liberation from illness provided and secured through PA maintenance. The understanding of regular PA as a resistance resource is essential to development future health promoting interventions aimed to encourage PA maintenance in patients with RA........ The analysis was discussed within a multidisciplinary team of qualitative researchers. Results: The analysis revealed tree dimensions of PA maintenance: (1) A bodily dimension: physical sensations of vitality, sparkling energy and liberation in movement; (2) a mental component: referring to experiences of self...... the participants to adjust to the uncertainty of the illness and preserving hope for a future dominated as little as possible by illness. Conclusions: While RA usually forces a negative attention to joint pain, fatigue and limited mobility in parts of the body, the participants in this study, despite illness...

  14. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  15. Optimization of the scheduled maintenance on the power units of the nuclear power plants with WWER

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kovrizhkin, Yu.L.; Kolykhanov, V.N.; Kochneva, V.Yu.; Urbanskij, V.V.

    2008-01-01

    The advanced international and domestic experience in the field of the maintenance optimization of the power units of NPPs, as well, as on the base of the planning optimization, the maintenance organization and carrying out, the technical maintenance and repair control system automatization, the testing and monitoring optimization during the service process, the modernization of the technology and technical tools of the maintenance service and control is represented

  16. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  17. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    Science.gov (United States)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  18. Epigenetic Regulation of Memory Formation and Maintenance

    Science.gov (United States)

    Zovkic, Iva B.; Guzman-Karlsson, Mikael C.; Sweatt, J. David

    2013-01-01

    Understanding the cellular and molecular mechanisms underlying the formation and maintenance of memories is a central goal of the neuroscience community. It is well regarded that an organism's ability to lastingly adapt its behavior in response to a transient environmental stimulus relies on the central nervous system's capability for structural…

  19. Maintenance Trades Guidelines

    Science.gov (United States)

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents…

  20. A study of adopting maintenance rule under the periodic safety review and reliability centered maintenance program

    International Nuclear Information System (INIS)

    Kilyoo, Kim

    2001-01-01

    U.S Maintenance Rule (MR) has three main functions. One is to monitor the performance changes of SSCs (Structure, System, and Component) caused by risk informed applications. Periodic Safety Review (PSR) program is widely adopted in Europe while it is not adopted in U. S. A where MR and new oversight program are instead used. Recently, in Korea, it was determined to adopt PSR, and the first PSR program has started this year for Kori unit 1 as a pilot plant. Also, a traditional Reliability Centered Maintenance (RCM) has been performed for 4 systems of YGN unit 1 and 2 and it will be applied to the other nuclear power plants in Korea. However, since MR is adopting many useful concept of RCM, traditional RCM could not be further performed without being associated with MR. Thus, MR, RCM and PSR have recently become hot issue policies which should be well associated each other in Korea, and this paper suggests a desirable new maintenance process which would embrace the concepts of the three policies, and also discusses whether U.S. MR is necessary even though a PSR program is already adopted, and if necessary, then how cost-effectively it can be introduced to. (author)

  1. A study on maintenance rule program and its application to Korean NPP - Rev.1

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Yang, Joon Eon; Ha, Jae Joo

    2001-03-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  2. SWOT Analysis of Urban Greening Maintenance and Management in the Central Pearl River Delta

    Institute of Scientific and Technical Information of China (English)

    Yanning; ZHENG; Fang; JIANG

    2013-01-01

    We take Shunde District,Foshan City in Guangdong Province for example,to carry out SWOT analysis of urban greening maintenance and management.The strengths of greening management and maintenance in Shunde District are as follows:(i)The greening area and quality are continuously improved in the downtown of Shunde District;(ii)The management and maintenance work is carried out well;(iii)The management and maintenance level tends to be increasingly perfected.The weaknesses of greening management and maintenance are as follows:(i)The fees for greening management and maintenance are very low;(ii)There is corner as yet untouched in the junction of some town streets;(iii)The greening management and maintenance technicians are unprofessional;(iv)The greening management is not in place;(v)There is management vacancy phenomenon in the management and maintenance of regional green space;(vi)The design and construction phase is flawed.Finally,based on the analysis of strengths and weaknesses of greening,we put forth the recommendations for the development of management and maintenance in urban green space.

  3. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  4. Managing and controlling maintenance

    International Nuclear Information System (INIS)

    Chavez, G.; Perla, H.F.

    1980-01-01

    A well-planned maintenance-management program can bring organized yet flexible scheduling, improved productivity, and a ready-access data bank. The system detailed in the article, developed for a nuclear power plant, has application to any equipment-intensive facility. Key features of the system include: documentation of all work requirements and their completion; automated prioritizing of work orders; automatic generation of work orders for repetitive work, when due; work lists in priority sequence; deferred, standby, and outage work reports; labor and work-order backlog information; equipment work histories and cumulative failure data

  5. Motivational indictors predicting the engagement, frequency and adequacy of rainwater tank maintenance

    Science.gov (United States)

    Mankad, Aditi; Greenhill, Murni

    2014-01-01

    Rainwater tank maintenance is a key social behavior in our changing environment, as tanks are being adopted worldwide to augment household water supplies and reduce urban water stress. The maintenance of rainwater tanks in urban areas is an important pro-environmental behavior that prevents public health issues arising from unhygienic tank use. This study examined motivational differences in maintenance behavior between householders with retrofitted and mandated (compulsory) rainwater tanks on their property (N = 1988). Results showed that retrofitted tank owners were more self-determined in their motivation than mandated owners. Amotivation and integrated regulation were both dominant predictors of engagement in tank maintenance, frequency and adequacy of tank maintenance activities. Those involved in more maintenance activity were likely driven to do so because of feelings of adherence to personal goals and values (e.g., as "sustainable" citizens), whereas individuals who experienced a lack of control and alienation from the activity were likely to view maintenance as meaningless. Thus, people with higher integrated regulation engaged in more tank maintenance activities, whereas more amotivated individuals engaged in less maintenance. As cities begin relying more on citizen self-sufficiency with respect to water and energy resources, issues relating to infrastructure maintenance and operation become paramount. Results show that motivation is important in the impetus to engage in a pro-environmental behavior as well as the frequency and accuracy with which that behavior is undertaken. Policy implications are further discussed.

  6. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  7. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  8. Plant Maintenance. The Licensee's Viewpoint

    International Nuclear Information System (INIS)

    Ungi, T.

    1997-01-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  9. On-line maintenance PSA support at NPP Krsko

    International Nuclear Information System (INIS)

    Prosen, R.; Vrbanic, I.; Kastelan, M.

    2000-01-01

    In 1997 Krsko NPP initiated the on-line maintenance (OLM) practice. On-line maintenance constitutes of corrective activities, preventive activities, surveillance activities, tests and inspections, as well as calibrations and modifications, taking place during the normal power operations. The on-line maintenance is a multidisciplinary process consisting of activity specification, planning, and preparation and performing of the OLM activity of interest. The primary role of the PSA group is to assess from the r isk perspective , using the plant-specific NEK PSA model, system unavailability and the impact to the plant operational risk. The intent is to support planning of the on-line maintenance activities from the risk perspective. The risk evaluation of the OLM activities is based on the probability of core damage evaluation for the defined discrete plant configuration states, determined by the OLM activities. Within this application, the optimized, plant-specific PSA model is used on Risk Spectrum platform. To perform the risk assessment of the on-line maintenance activities, first the systems to be affected are defined based on the planned OLM activities. The next important step is the assessment of the planned work schedule. To define the final schedule, the co-ordination and optimizing the planned OLM activities needs activation of all participating departments, supported also from PSA group. The P3 (i.e. Primavera) planning tool system windows are defined for different systems and groups of systems, and the activities are sorted in particular weeks according to these windows. (author)

  10. Maintenance of Certification®, Maintenance of Public Trust

    Science.gov (United States)

    Chung, Kevin C.; Clapham, Philip J.; Lalonde, Donald H.

    2010-01-01

    The Maintenance of Certification® (MOC) program has been well received by many physicians, but faced significant opposition from others, who complain that it is overly tedious, costly, and irrelevant to their practice. This article offers a consolidated and concise history of the MOC program and a summary of what plastic surgeons need to know to successfully complete the American Board of Plastic Surgery’s (ABPS) own MOC requirements. The authors have justified each step of the ABPS’s MOC process in terms of how it improves the quality of care delivered to Plastic Surgery patients. Finally, a summary of research is presented that demonstrates both that the public supports the MOC process for all physicians and that continuing education and formal assessment and improvement initiatives have been linked in multiple studies to a better and more evidence-based medical practice. PMID:21285803

  11. Component-Based Data-Driven Predictive Maintenance to Reduce Unscheduled Maintenance Events

    NARCIS (Netherlands)

    Verhagen, W.J.C.; Curran, R.; de Boer, L.W.M.; Chen, C.H.; Trappey, A.C.; Peruzzini, M.; Stjepandić, J.; Wognum, N.

    2017-01-01

    Costs associated with unscheduled and preventive maintenance can contribute significantly to an airline's expenditure. Reliability analysis can help to identify and plan for maintenance events. Reliability analysis in industry is often limited to statistically based

  12. Remote maintenance for fusion experimental reactor

    International Nuclear Information System (INIS)

    Koizumi, Koichi; Takeda, Nobukazu

    2000-01-01

    Here was introduced on maintenance of reactor core portion operated by remote control among maintenance of the International Thermonuclear Experimental Reactor (ITER) begun on its design since 1988 under international cooperation of U.S.A., Europe, Russia and Japan. Every appliances constructing the reactor core portion is necessary to carry out all of their inspection and maintenance by using remote controlled apparatus because of their radiation due to neutron generated by DT combustion of plasma. For engineering design activity (EDA) in ITER, not only design and development of the remote control appliances but also design under consideration of remote maintenance for from structural design of maintained objective appliances to access method to appliances, transportation and preservation method of radiated matters, and out-reactor maintenance in a hot cell, is now under progress. Here were also reported on basic concept on maintenance and conservation of ITER, maintenance design of diverter and blanket with high maintenance frequency and present state on development of maintenance appliances. (G.K.)

  13. Maintenance Chemotherapy for Advanced Non–Small-Cell Lung Cancer: New Life for an Old Idea

    Science.gov (United States)

    Gerber, David E.; Schiller, Joan H.

    2013-01-01

    Although well established for the treatment of certain hematologic malignancies, maintenance therapy has only recently become a treatment paradigm for advanced non–small-cell lung cancer. Maintenance therapy, which is designed to prolong a clinically favorable state after completion of a predefined number of induction chemotherapy cycles, has two principal paradigms. Continuation maintenance therapy entails the ongoing administration of a component of the initial chemotherapy regimen, generally the nonplatinum cytotoxic drug or a molecular targeted agent. With switch maintenance (also known as sequential therapy), a new and potentially non–cross-resistant agent is introduced immediately on completion of first-line chemotherapy. Potential rationales for maintenance therapy include increased exposure to effective therapies, decreasing chemotherapy resistance, optimizing efficacy of chemotherapeutic agents, antiangiogenic effects, and altering antitumor immunity. To date, switch maintenance therapy strategies with pemetrexed and erlotinib have demonstrated improved overall survival, resulting in US Food and Drug Administration approval for this indication. Recently, continuation maintenance with pemetrexed was found to prolong overall survival as well. Factors predicting benefit from maintenance chemotherapy include the degree of response to first-line therapy, performance status, the likelihood of receiving further therapy at the time of progression, and tumor histology and molecular characteristics. Several aspects of maintenance therapy have raised considerable debate in the thoracic oncology community, including clinical trial end points, the prevalence of second-line chemotherapy administration, the role of treatment-free intervals, quality of life, economic considerations, and whether progression-free survival is a worthy therapeutic goal in this disease setting. PMID:23401441

  14. The study of the maintenance for a cryogenics pilot plant in nuclear regime

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2002-01-01

    The Cryogenic Pilot Plant, CPP, has as goal the extraction of tritium from heavy water at the CANDU Reactors in Cernavoda. Its operation allows a continuos nuclear regime. CPP consists in several modules, each of them implying static and dynamical complex equipment in which fluids circulate at cryogenic temperatures. From these reasons it results that the CPP maintenance is essential. The relational structure regarding the integrated maintenance systems in the whole ICSI's activity is presented in the frame of management decision system and contains a procedural program of maintenance (PPM). PPM includes adoption strategy for maintenance activity in the conditions required by the Manuals worked out in compliance with QA of ICSI and specific regulations of operation in nuclear regime. An explanation based on a thorough analysis is given for the strategy of maintenance, the structure of modules and the use of informatics subsystems. The structure of PPM strategy has a flowchart implying: - Reorganization, Scientific background, and Operative Maintenance strategy (inside/outside strategy) as well as PPM stage realization and specifications for maintenance assurance (manuals, cards and subsystems). Also, provided in the maintenance strategy are the PPM preparatory and proper stage conceptions

  15. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  16. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  17. Residual life management. Maintenance improvement

    International Nuclear Information System (INIS)

    Sainero Garcia, J.; Hevia Ruperez, F.

    1995-01-01

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme's subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  18. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  19. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  20. Laboratory equipment maintenance contracts.

    Science.gov (United States)

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  1. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  2. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  3. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  4. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  5. Total Productive Maintenance at Paccar INC

    OpenAIRE

    Ştefan Farkas

    2010-01-01

    This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  6. Development and introduction of a modular training and qualification concept for maintenance personnel

    International Nuclear Information System (INIS)

    Kumpf, Thomas; Mueller, Nina; Hofbauer, Detlef

    2009-01-01

    The presentation entitled ''Development and Introduction of a Modular Training and Qualification Concept for Maintenance Personnel'' presents the background, concept and training modules of a reactor services training concept that was jointly elaborated by a working group consisting of the ''Maintenance manager workshop'' working panel of the VGB, the Kraftwerksschule (KWS) PowerTech Training Center, and AREVA NP GmbH in Erlangen and Offenbach. This concept is part of AREVA's comprehensive training and qualification approach which comprises inter alia extensive introduction sessions for new employees, the corporation-wide highly appreciated AREVA University as well as specialized training facilities as for example the CETIC in Chalon-sur-Saone, France and the training center in Lynchburg, USA, or the worldwide largest integration center for digital I and C equipment for safety applications in nuclear power plants in Erlangen. AREVA NP's training concept for maintenance personnel addresses not only employees from AREVA NP working in nuclear maintenance but also personnel from nuclear power plants as well as independent experts, representatives from authorities and other interest groups. (orig.)

  7. Online maintenance policy for a deteriorating system with random change of mode

    Energy Technology Data Exchange (ETDEWEB)

    Saassouh, B. [Laboratoire de Modelisation et Surete des Systemes, Institut Charles Delaunay-FRE CNRS 2848, Universite de Technologie de Troyes, 12, rue Marie Curie-BP 2060, 10010 Troyes Cedex (France); Dieulle, L. [Laboratoire de Modelisation et Surete des Systemes, Institut Charles Delaunay-FRE CNRS 2848, Universite de Technologie de Troyes, 12, rue Marie Curie-BP 2060, 10010 Troyes Cedex (France); Grall, A. [Laboratoire de Modelisation et Surete des Systemes, Institut Charles Delaunay-FRE CNRS 2848, Universite de Technologie de Troyes, 12, rue Marie Curie-BP 2060, 10010 Troyes Cedex (France)]. E-mail: antoine.grall@utt.fr

    2007-12-15

    Most of maintenance policies proposed in the literature for gradually deteriorating systems, consider a stationary deterioration process. This paper is an attempt to take into account stochastically deteriorating systems which are subject to a sudden change in their degradation process. A technical device subject to gradual degradation is considered. It is assumed that the level of degradation can be resumed by a single scalar variable. An online maintenance decision rule is proposed, which makes it possible to take into account in real time the online information available on the operating mode of the system as well as its actual deterioration level. We show the efficiency of considering online decision rules for maintenance with respect to traditional maintenance policies based on a static alarm threshold. Numerical simulations are given, to assess and optimize the performance of the maintained system from its asymptotic unavailability point of view. It is compared to the results obtained with classical control-limit maintenance policies.

  8. Knowledge maintenance in myCBR

    OpenAIRE

    Aul, Vani; Sauer, Christian; Roth-Berghofer, Thomas

    2014-01-01

    CBR systems, being knowledge based systems, process knowledge. Due to changes in the environment a CBR system’s knowledge model can become outdated, thus creating a need for constant maintenance of said knowledge model. In this paper, we describe an implementation of (semi-)automatic knowledge maintenance of two of the four knowledge containers of CBR systems, specifically case base maintenance and maintenance of similarity measures within the CBR system development SDK myCBR. We describe our...

  9. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  10. Total Productive Maintenance at Paccar INC

    Directory of Open Access Journals (Sweden)

    Ştefan Farkas

    2010-06-01

    Full Text Available This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  11. Activities of maintenance and outage

    International Nuclear Information System (INIS)

    Gracia-Orellan, J. M.; Gonzalez, P. L.; Verdu, M. F.; Fernandez, J. A.

    2004-01-01

    Iberinco Nuclear Generation Department have wanted to promote service activities in nuclear power plants for years besides its dedication to engineering activities. for it, in 1997 Nuclear Services Management was created to complement engineering activities and to be able to make an offer for products and turn key services. People involved in this Management have an extensive experience in Services Area, so that all type of maintenance works are promoted, as well other services like dismantling, fallout management and new equipment's for nuclear power plants services. Iberinco's experience in Support Services in Nuclear Power Plants allows to answer effectively to special workers during operation cycle and outages periods. These activities have been made in spanish nuclear power plants and Angra I and II plants, both of them in Brazil. In this area we provide Technical Consulting Management and Supervision to develop the following activities: - Improvement Maintenance Programs based in PSA: Implantation of Maintenance Rule in the plants. - Supervision and Assembly of design modifications in structures, systems and components. - Fulfilment of efficiency tests, inspection and turbo-group modification. - Noise and vibrations analysis. - Valves and rotative equipment calculations and diagnosis tests. Iberinco develop these outage activities itself or as contractors coordinator under its management. A lot of them have been working with Iberinco for many years and have a great experience in the Service Area they are developing. In this article, the main outage activities developed for Iberinco are detailed. (Author)

  12. Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots

    Science.gov (United States)

    2017-02-03

    in turn enable testing of helicopter rotor blades. The Army has also made investments in logistics software at all of its depots. According to the...maintenance and repair of structural helicopter airframes and blades; advanced composite technologies; flight controls and control surfaces; and...level maintenance on a wide range of vehicles and other military assets, including helicopters , combat vehicles, ships, aircraft, engines, and software

  13. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  14. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  15. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    OpenAIRE

    G. Waeyenbergh; L. Pintelon; L. Gelders

    2012-01-01

    Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised mainten...

  16. Interactive videodisc in maintenance

    International Nuclear Information System (INIS)

    Zwingelstein, G.; Nguyen Van Nghi, B.

    1986-01-01

    After a recall of the videodisc characteristics, this paper presents its utilization by Electricite de France in the framework of training and maintenance. The SICMA (Interactive Communication System in Maintenance) developed and tested by Electricte de France is presented as also its utilization. It has been tested on the sites of Dampierre and Paluel in the cases of training and maintenance (deconnexion of drive rods of control elements); the conclusions of this experimentation are finally given. 4 refs [fr

  17. Status of fusion maintenance

    International Nuclear Information System (INIS)

    Fuller, G.M.

    1984-01-01

    Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission

  18. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  19. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  20. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  1. Maintenance and disassembly considerations for the Technology Demonstration Facility

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The Technology Demonstration Facility (TDF) is a tandem-mirror design concept carried out under the direction of Lawrence Livermore National Laboratory. It was conceived as a near-term device with a mission of developing engineering technology in a D-T fusion environment. Overall maintenance and component disassembly were among the responsibilities of the Fusion Engineering Design Center (FEDC). A configuration evolved that was based on the operational requirements of the components, as well as the requirements for their replacements. Component lifetime estimates were used to estimate the frequency and the number of replacements. In addition, it was determined that the need for remote handling equipment followed within 1.5 years after initial start-up, emphasizing the direct relationship between developing maintenance scenarios/equipment and the device configuration. Many of the scheduled maintenance operations were investigated to first order, and preliminary handling equipment concepts were developed

  2. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  3. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  4. Mechanical configuration and maintenance

    International Nuclear Information System (INIS)

    Brown, T.G.; Casini, G.; Churakov, G.F.

    1982-01-01

    The INTOR engineering design has been strongly influenced by considerations for assembly and maintenance. A maintenance philosophy was established at the outset of the conceptual design to insure that the tokamak configuration would be developed to accommodate maintenance requirements. The main features of the INTOR design are summarized in this paper with primary emphasis on the impact of maintenance considerations. The most apparent configuration design feature is the access provided for torus maintenance. Particular attention was given to the size and location of superconducting magnets and the location of vacuum boundaries. All of the poloidal field (PF) coils are placed outside of the bore of the toroidal field (TF) coils and located above and below an access opening between adjacent TF coils through which torus sectors are removed. A magnet structural configuration consisting of mechanically attached reinforcing members has been designed which facilitates the open access space for torus sector removal. For impurity control, a single null poloidal divertor was selected over a double null design in order to maintain sufficient access for pumping and maintenance of the collector. A double null divertor was found to severely limit access to the torus with the addition of divertor collectors and pumping at the top. For this reason, a single null concept was selected in spite of the more difficult design problems associated with the required asymmetric PF system and higher particle loadings

  5. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  6. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XX, CUMMINS DIESEL ENGINE, MAINTENANCE SUMMARY.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF THE REASONS AND PROCEDURES FOR DIESEL ENGINE MAINTENANCE. TOPICS ARE WHAT ENGINE BREAK-IN MEANS, ENGINE BREAK-IN, TORQUING BEARINGS (TEMPLATE METHOD), AND THE NEED FOR MAINTENANCE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "CUMMINS DIESEL ENGINE…

  7. Formalisation of a new prognosis model for supporting proactive maintenance implementation on industrial system

    International Nuclear Information System (INIS)

    Muller, Alexandre; Suhner, Marie-Christine; Iung, Benoit

    2008-01-01

    The importance of the maintenance function has increased because of its role in keeping and improving system availability and safety, as well as product quality. To support this role, the maintenance concept has undergone several major developments that have led to proactive considerations mainly based on a prognosis process, which normally allows selection of the best maintenance action to be carried out. This paper proposes the deployment and experimentation of a prognosis process within an e-maintenance architecture. The deployment follows a methodology based on the combination of both a probabilistic approach for modelling the degradation mechanism and of an event one for dynamical degradation monitoring. The feasibility and benefits of this new prognosis process is investigated with an experiment using a manufacturing TELMA (TELe-MAintenance) platform supporting the unwinding of metal bobbins

  8. 75 FR 4099 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-06] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  9. 75 FR 37457 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-06-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-54] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  10. Maintenance of non-consciously presented information engages the prefrontal cortex

    Directory of Open Access Journals (Sweden)

    Fredrik eBergström

    2014-11-01

    Full Text Available Conscious processing is generally seen as required for flexible and willful actions, as well as for tasks that require durable information maintenance. Here we present research that questions the assumption that only consciously perceived information is durable (> 500 ms. Using the attentional blink phenomenon, we rendered otherwise relatively clearly perceived letters non-conscious. In a first experiment we systematically manipulated the delay between stimulus presentation and response, for the purpose of estimating the durability of non-conscious perceptual representations. For items reported not seen, we found that behavioral performance was better than chance across intervals up to 15 seconds. In a second experiment we used fMRI to investigate the neural correlates underlying the maintenance of non-conscious perceptual representations. Critically, the relatively long delay period demonstrated in experiment 1 enabled isolation of the signal change specifically related to the maintenance period, separate from stimulus presentation and response. We found sustained BOLD signal change in the right mid-lateral prefrontal cortex, orbitofrontal cortex, and crus II of the cerebellum during maintenance of non-consciously perceived information. These findings are consistent with the controversial claim that working-memory mechanisms are involved in the short-term maintenance of non-conscious perceptual representations.

  11. Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Khaled Alhamad

    2015-01-01

    Full Text Available This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.

  12. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  13. Analyzing maintenance strategies by agent-based simulations: A feasibility study

    International Nuclear Information System (INIS)

    Kaegi, M.; Mock, R.; Kroeger, W.

    2009-01-01

    Thoroughly planned and implemented maintenance strategies save time and cost. However, the integration of maintenance work into reliability analysis is difficult as common modeling techniques are often not applicable due to state explosion which calls for restrictive model assumptions and oversimplification. From authors' point of view, agent-based modeling (ABM) of technical and organizational systems is a promising approach to overcome such problems. But since ABM is not well established in reliability analysis its feasibility in this area still has to be demonstrated. For this purpose ABM is compared with Markov chains, namely by analyzing the reliability of a maintained n-unit system with dependent repair events, applying both modeling approaches. Although ABM and Markov chains lead to the same numerical results, the former points out the potentiality of an improved system state handling. This is demonstrated by extending the ABM with operators as additional 'agents' featuring their location (x;y) availability (0;1) and different maintenance strategies. This extension highlights the capability of ABM to analyze complex emergent system behavior and allows a systematic refinement and optimization of the maintenance strategies.

  14. Unsurfaced Road Maintenance Management

    Science.gov (United States)

    1992-12-01

    This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...

  15. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  16. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  17. 7 CFR 1776.17 - Revolving loan fund maintenance.

    Science.gov (United States)

    2010-01-01

    ..., justifies different amounts, a reserve for bad debts of 6 percent of outstanding loans must be accumulated... 7 Agriculture 12 2010-01-01 2010-01-01 false Revolving loan fund maintenance. 1776.17 Section 1776..., DEPARTMENT OF AGRICULTURE (CONTINUED) HOUSEHOLD WATER WELL SYSTEM GRANT PROGRAM HWWS Loans § 1776.17...

  18. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  19. Maintenance manual. Vol. 1. Maintenance management; 2. completely rev. ed.; Handbuch Instandhaltung. Bd. 1. Instandhaltungsmanagement

    Energy Technology Data Exchange (ETDEWEB)

    Warnecke, H.J. [ed.] [Fraunhofer-Institut fuer Produktionstechnik und Automatisierung (IPA), Stuttgart (Germany)

    1992-12-31

    This manual is the second, completely revised edition of the standard manual ``Maintenance - Fundamentals``, which was first published in 1981. It presents an outline of all relevant fields of maintenance today and contains practical information on new and established methods of maintenance management and technology. With its comprehensive concept, which addresses any industrial enterprise that wants to remain competitive, the manual is indispensable for maintenance managers in industry, service enterprises and consultancies. Vol.1, ``Maintenance Management``, informs the reader on fundamentals, design with a view to maintenance, organisation of maintenance work, personnel management, industrial safety and economic aspects of maintenance. Current issues such as product liability, electronic data processing, expert systems, environmental protection, controlling based on characteristic data, etc. are gone into. Graphical representations, concrete procedural information and exemplary solutions may be used directly as working tools for the practice of maintenance. (orig.) [Deutsch] Das vorliegende Handbuch ist die zweite, voellig ueberarbeitete und erweiterte Auflage des Standardwerkes ``Instandhaltung - Grundlagen``, das 1981 erstmals erschien. Es gibt einen Ueberblick ueber alle relevanten Gebiete einer modernen Instandhaltung und vermittelt praxisnahes Wissen ueber neue und bewaehrte Methoden und Verfahren des Instandhaltungsmanagements und der Instandhaltungstechnik. Mit dieser umfassenden Konzeption, die auf die Belange des im Wettbewerb stehenden Industriebetriebes ausgerichtet ist, wendet sich das Handbuch an die Fuehrungskraefte der Instandhaltung in der Industrie sowie an Dienstleistungs- und Beratungsunternehmen. Im Band 1 ``Instandhaltungsmanagement`` kann sich der Leser ueber Grundlagen, instandhaltungsgerechtes Konstruieren, Organisation der Instandhaltung, Personalmanagement, Arbeitssicherheit sowie Wirtschaftlichkeit der Instandhaltung informieren

  20. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  1. Pemetrexed in maintenance treatment of advanced non-squamous non-small-cell lung cancer.

    Science.gov (United States)

    Minami, Seigo; Kijima, Takashi

    2015-01-01

    Pemetrexed, a multitargeting antifolate cytotoxic drug, plays a leading role in front-line chemotherapy for patients with advanced non-squamous non-small-cell lung cancer (NSCLC). Following its approval as second-line monotherapy for locally advanced or metastatic non-squamous NSCLC, pemetrexed has established itself as the first-line regimen in combination with cisplatin, and its powerful antitumor effects and less cumulative toxicities were then taken advantage of in the JMEN and PARAMOUNT trials, respectively, to pioneer a new treatment strategy of switch and continuation maintenance monotherapy. These developments have brought about a marked paradigm shift, and made pemetrexed indispensable in the treatment for non-squamous NSCLC. So far, only three drugs have been approved for maintenance therapy; pemetrexed both by switch and continuation maintenance, erlotinib by switch maintenance, and bevacizumab by continuation maintenance. Compared with observation alone after defined cycles of the first-line chemotherapy, subsequent pemetrexed maintenance therapy has provided significantly longer survival and infrequent severe adverse events. The cost-effectiveness of pemetrexed maintenance therapy is controversial, as well as the other two maintenance drugs, bevacizumab and erlotinib. The latest attractive attention is a combination maintenance therapy. We may have to consider epidermal growth factor receptor (EGFR) mutation status for selection of a combination pattern. A combination maintenance therapy of pemetrexed plus bevacizumab is potential for patients with wild-type EGFR status, while a EGFR tyrosine kinase inhibitor-containing combination is promising for patients with active EGFR mutation status. Pemetrexed will be a pivotal drug when a combination maintenance therapy is used in practice. For future maintenance therapy, we need to explore reliable predictive selection or exclusion markers that can predict who will really benefit from maintenance therapy.

  2. Regulatory surveillance of safety related maintenance at nuclear power plants. Report of a technical committee meeting

    International Nuclear Information System (INIS)

    1997-08-01

    The operational safety and reliability of a nuclear power plant as well as its availability for electricity generation depend on, among other things, its maintenance programme. Regulatory bodies therefore have considerable interest in maintenance activities. There are several approaches to maintenance, i.e. reliability centered maintenance or risk focused maintenance, aimed at optimizing maintenance by focusing on important components or systems. These approaches may result in significant changes to maintenance activities and therefore have to be considered for regulatory acceptance. In order to review and discuss the status of maintenance regulation in participating countries, the IAEA convened a Technical Committee Meeting on Regulatory Oversight of Maintenance Activities at Nuclear Power Plants in Vienna from 9 to 13 October 1995. The meeting was attended by 16 experts from 11 countries. In addition to the consideration of papers that were presented and which are reproduced here, extensive group and panel discussions took place during the meeting. These covered three main topics: general features and basic characteristics of maintenance regulation, regulatory acceptance of maintenance optimization and use of PSA for maintenance optimization. The discussion are summarized in Section 2. Section 3 discusses the following three additional topics: regulatory involvement in the maintenance programme, modifications to the maintenance programme and personnel related aspects of maintenance. The conclusions are presented in Section 4. Figs, tabs

  3. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  4. Contracting Maintenance Services: An Easy Question, but a Difficult Answer.

    Science.gov (United States)

    Geiger, Philip E.

    2003-01-01

    Discusses issues involved in outsourcing school maintenance and custodial services. There are many advantages to this approach, but it has definite drawbacks. In many instances, a combination of contract and employee services works well. (SLD)

  5. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  6. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  7. Developing a CANDU industry maintenance guide. A 'community of practice' compendium

    International Nuclear Information System (INIS)

    Von Hatten, P.; Hoye, D.S.

    2011-01-01

    The CANDU Owners Group (COG) has initiated a joint utility project to create an Industry Maintenance Guide. The primary goal of the guide is to provide a structured template of activities to implement the maintenance program, based on industry best practices, and with consideration for new regulatory requirements identified in the Canadian Nuclear Safety Commission document S210. The guide will be prepared with a macro view of the maintenance program, which includes core maintenance activities as well as supporting activities and programs in Engineering, Supply Chain and Work Management. Currently there is no such document that solidly links all the requirements to develop, support and execute a maintenance program. Some elements are captured in various industry documents such as INPO documents AP928, Work Management, AP913, Equipment Reliability and AP908, Materials and Services. The guide will not replicate these good practices, but will focus on how they are linked and interrelate to create an optimum program. It is expected that utilities will be able to utilize the guide to take the next incremental step in performance based on cross functional alignment and efficiency.

  8. Maintenance for life management

    International Nuclear Information System (INIS)

    Hevia, F.

    1997-01-01

    Life Management is based on the detection, monitoring and control of long-term degradation that affects individual plant components and important populations. Experience has shown that in many cases current maintenance practices do not attend to ageing directly; instead they deal with the consequences when it is already too late, when good Life Management is no longer practical. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to project against, monitor and mitigate ageing that can affect the safe and profitable operating life of the facility. New regulatory requirements for ageing monitoring and effective maintenance to ensure safety (Maintenance Rule) have made it even more necessary to implement the Maintenance Evaluation Programme to cope with ageing, and to integrate that tasks in both programmes to optimise effort and use of tools. This paper presents a brief description of the objectives and methodologies of these Programmes which has been applied to plants around the world and in Spain at the Garona and Vandellos II plants in Spain as part of the PIE project for developing a Remanent Life Evaluation System for nuclear power plants. (Author)

  9. The advantages of reliability centered maintenance for standby safety systems

    International Nuclear Information System (INIS)

    Dam, R.F.; Ayazzudin, S.; Nickerson, J.H.; DeLong, A.I.

    2002-01-01

    predictive monitoring. The testing in this strategy is part of an effort to ensure that the desired function is not only available today, but will be available tomorrow as well. This paper considers the application of a streamlined form of RCM to the Emergency Core Cooling (ECC) and Standby Generator (SG) Systems of a CANDU plant. Recently completed studies provide useful insight into the important value added of the systematic assessment approach (using RCM techniques) for these standby safety systems. In the case of RCM analysis performed on the Emergency Core Cooling (ECC) System of Point Lepreau Nuclear Power Generating Station (PLGS), it was found that 60% of the current maintenance tasks are testing (functional, stroke, logic, and annunciation tests). Similarly, the SGs have 50% of the maintenance tasks associated with testing. The paper considers how the results of the RCM analysis demonstrate that the analysis can be used to assist in the optimization of the testing program dictated by reliability while also taking better advantage of the testing through condition monitoring and predictive maintenance techniques. Further, the results illustrate the importance of identifying and linking the different plant activities within a well integrated plant culture. (author)

  10. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    Directory of Open Access Journals (Sweden)

    Mihai Florian

    2015-09-01

    Full Text Available Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair and replacement activities as well as large revenue losses, mainly in the case of offshore wind farms. The recent development and evolution of condition monitoring techniques, as well as the fact that an increasing number of installed turbines are equipped with online monitoring systems, offers a large amount of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law approach. The model is used within a risk-based maintenance decision framework to optimize maintenance planning for the blades lifetime.

  11. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  12. Space station orbit maintenance

    Science.gov (United States)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  13. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  14. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    Directory of Open Access Journals (Sweden)

    G. Waeyenbergh

    2012-01-01

    Full Text Available Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised maintenance concept. After describing the general framework and its decision support use, some case experiences are given. This experience covers some elements of the proposed framework.

  15. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  16. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  17. Developing optimized prioritizing road maintenance

    Directory of Open Access Journals (Sweden)

    Ewadh Hussein Ali

    2018-01-01

    Full Text Available Increased demand for efficient maintenance of the existing roadway system needs optimal usage of the allocated funds. The paper demonstrates optimized methods for prioritizing maintenance implementation projects. A selected zone of roadway system in Kerbala city represents the study area to demonstrate the application of the developed prioritization process. Paver system PAVER integrated with GIS is used to estimate and display the pavement condition index PCI, thereby to establish a priority of maintenance. In addition to simple ranking method by PCI produced by the output of PAVER, the paper introduces PCI measure for each section of roadway. The paper introduces ranking by multiple measures investigated through expert knowledge about measures that affect prioritization and their irrespective weights due to a predesigned questionnaire. The maintenance priority index (MPI is related to cost of suitable proposed maintenance, easiness of proposed maintenance, average daily traffic and functional classification of the roadway in addition to PCI. Further, incremental benefit-cost analysis ranking provide an optimized process due to benefit and cost of maintenance. The paper introduces efficient display of layout and ranking for the selected zone of roadway system based on MPI index and incremental BCR method. Although the two developed methods introduce different layout display for priority, statistical test shows that no significant difference between ranking of all methods of prioritization.

  18. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  19. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  20. Cognitive Reserve and Brain Maintenance: Orthogonal Concepts in Theory and Practice.

    Science.gov (United States)

    Habeck, C; Razlighi, Q; Gazes, Y; Barulli, D; Steffener, J; Stern, Y

    2017-08-01

    Cognitive Reserve and Brain Maintenance have traditionally been understood as complementary concepts: Brain Maintenance captures the processes underlying the structural preservation of the brain with age, and might be assessed relative to age-matched peers. Cognitive Reserve, on the other hand, refers to how cognitive processing can be performed regardless of how well brain structure has been maintained. Thus, Brain Maintenance concerns the "hardware," whereas Cognitive Reserve concerns "software," that is, brain functioning explained by factors beyond mere brain structure. We used structural brain data from 368 community-dwelling adults, age 20-80, to derive measures of Brain Maintenance and Cognitive Reserve. We found that Brain Maintenance and Cognitive were uncorrelated such that values on one measure did not imply anything about the other measure. Further, both measures were positively correlated with verbal intelligence and education, hinting at formative influences of the latter to both measures. We performed extensive split-half simulations to check our derived measures' statistical robustness. Our approach enables the out-of-sample quantification of Brain Maintenance and Cognitive Reserve for single subjects on the basis of chronological age, neuropsychological performance and structural brain measures. Future work will investigate the prognostic power of these measures with regard to future cognitive status. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  1. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  2. Reducing costs with optimized maintenance strategies. Energie AG Oberoesterreich's practical experience with computer-aided maintenance planning and order processing; Kostensenkung durch optimale Instandhaltungsstrategien. Einsatzerfahrungen der Energie AG Oberoesterreich mit EDV-gestuetzter IH-Planung und Auftragsabwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Lechner, K.D.; Raffelsberger, K.; Steininger, W. [Energie AG Oberoesterreich (Austria); Roeben, U. [Siemens Power Generation AG, Erlangen (Germany)

    2004-07-01

    With the increasing competition, application of the optimal maintenance strategy is gaining importance. Apart from optimizing direct maintenance costs, the effects on profit (e.g. due to loss of production), follow-up costs in plant operation as well as safety-related aspects and the environmental impact are important factors. Without state-of-the-art plant management and maintenance software, efficiently meeting the resulting requirements is quite impossible. (orig.)

  3. Fatigue Risk Management in Aviation Maintenance: Current Best Practices and Potential Future Countermeasures

    Science.gov (United States)

    2011-06-01

    a maintenance organization to permit a maintainer who is significantly impaired by fatigue or a psychoactive substance to carry out maintenance on...of the topic, while the second contains detail on fatigue, fatigue management strate- gies, as well as information on nutrition, drugs , alcohol...recommended that the person avoids the routine consumption of caffeinated drinks, as caffeine is less effective as an alerting agent for people

  4. Exploring maintenance policy selection using the Analytic Hierarchy Process; An application for naval ships

    International Nuclear Information System (INIS)

    Goossens, Adriaan J.M.; Basten, Rob J.I.

    2015-01-01

    In this paper we investigate maintenance policy selection (MPS) through the use of the Analytic Hierarchy Process (AHP). A maintenance policy is a policy that dictates which parameter triggers a maintenance action. In practice, selecting the right maintenance policy appears to be a difficult decision. We investigate MPS for naval ships, but our results have wider applicability. For our study we cooperate with the owner and operator of the ships, as well as with a shipbuilder and an original equipment manufacturer of naval ships. We apply a structured five step approach to obtain the relevant criteria that may make one policy preferable over another. The criteria are drawn from both literature and a series of interviews at several navy related companies and are structured into a hierarchy of criteria usable with the AHP. Additionally, we organize three workshops at the three different companies to test the AHP-based MPS approach in practice. We conclude that the AHP is well suited for maintenance policy selection in this broad setting, and that it provides a structured and detailed approach for MPS. Adding to that, it facilitates discussions during and after the sessions, creating a better understanding of the policy selection process. - Highlights: • We use the Analytic Hierarchy Process (AHP) for maintenance policy selection (MPS). • Using both interviews and case studies from the literature, we construct a hierarchy. • In sessions at 3 companies, we find that 1 hierarchy can be used for multiple assets. • The AHP creates a better understanding of the maintenance policy selection process. • Our work is on naval ships, but our approach and findings have wider applicability

  5. Maintenance systems and procedures used in a nuclear power station and their relevance to other industries

    International Nuclear Information System (INIS)

    Kirk, R.R.

    1985-01-01

    The maintenance systems and procedures used at the Forsmark Nuclear Power Plant in Sweden can be viewed as a model which maintenance managers in other non-nuclear industries may adapt for their purposes. With the aid of a computerized information system covering the functions of work orders, preventative maintenance, documentation and others, plus a more conventional personnel structure, the result is an efficient, confident and well informed maintenance group. By following the basic design principles of the computerized information system used at the Forsmark Nuclear Power Station plus similar personnel structures, the performance of maintenance teams in non-nuclear manufacturing, processing and other industries could be improved to the standards of those observed

  6. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  7. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  8. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  9. Pemetrexed in maintenance treatment of advanced non-squamous non-small-cell lung cancer

    Directory of Open Access Journals (Sweden)

    Minami S

    2015-01-01

    Full Text Available Seigo Minami,1 Takashi Kijima2 1Department of Respiratory Medicine, Osaka Police Hospital, 2Department of Respiratory Medicine, Allergy and Rheumatic Diseases, Osaka University Graduate School of Medicine, Osaka, Japan Abstract: Pemetrexed, a multitargeting antifolate cytotoxic drug, plays a leading role in front-line chemotherapy for patients with advanced non-squamous non-small-cell lung cancer (NSCLC. Following its approval as second-line monotherapy for locally advanced or metastatic non-squamous NSCLC, pemetrexed has established itself as the first-line regimen in combination with cisplatin, and its powerful antitumor effects and less cumulative toxicities were then taken advantage of in the JMEN and PARAMOUNT trials, respectively, to pioneer a new treatment strategy of switch and continuation maintenance monotherapy. These developments have brought about a marked paradigm shift, and made pemetrexed indispensable in the treatment for non-squamous NSCLC. So far, only three drugs have been approved for maintenance therapy; pemetrexed both by switch and continuation maintenance, erlotinib by switch maintenance, and bevacizumab by continuation maintenance. Compared with observation alone after defined cycles of the first-line chemotherapy, subsequent pemetrexed maintenance therapy has provided significantly longer survival and infrequent severe adverse events. The cost-effectiveness of pemetrexed maintenance therapy is controversial, as well as the other two maintenance drugs, bevacizumab and erlotinib. The latest attractive attention is a combination maintenance therapy. We may have to consider epidermal growth factor receptor (EGFR mutation status for selection of a combination pattern. A combination maintenance therapy of pemetrexed plus bevacizumab is potential for patients with wild-type EGFR status, while a EGFR tyrosine kinase inhibitor-containing combination is promising for patients with active EGFR mutation status. Pemetrexed will be

  10. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  11. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  12. e-Learning Application for Machine Maintenance Process using Iterative Method in XYZ Company

    Science.gov (United States)

    Nurunisa, Suaidah; Kurniawati, Amelia; Pramuditya Soesanto, Rayinda; Yunan Kurnia Septo Hediyanto, Umar

    2016-02-01

    XYZ Company is a company based on manufacturing part for airplane, one of the machine that is categorized as key facility in the company is Millac 5H6P. As a key facility, the machines should be assured to work well and in peak condition, therefore, maintenance process is needed periodically. From the data gathering, it is known that there are lack of competency from the maintenance staff to maintain different type of machine which is not assigned by the supervisor, this indicate that knowledge which possessed by maintenance staff are uneven. The purpose of this research is to create knowledge-based e-learning application as a realization from externalization process in knowledge transfer process to maintain the machine. The application feature are adjusted for maintenance purpose using e-learning framework for maintenance process, the content of the application support multimedia for learning purpose. QFD is used in this research to understand the needs from user. The application is built using moodle with iterative method for software development cycle and UML Diagram. The result from this research is e-learning application as sharing knowledge media for maintenance staff in the company. From the test, it is known that the application make maintenance staff easy to understand the competencies.

  13. Digital maintenance field technology for the maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Sato, Tomomasa; Asama, Hajime; Kita, Nobuyuki; Numano, Masayoshi

    2002-01-01

    This paper proposes a concept of 'Digital Maintenance Field Technology', which enables human beings and working robots making fully use of the necessary information for maintenance activity not only in any location of the maintenance field (seamless in location) but also in any moment from the past to the future (seamless in time) and in any format in presenting to human (seamless in semantics). The paper points out the following three essential components of the technology: 1) 'Digital Field Construction Technology', 2) 'Digital Field Archival Technology' and 3) 'Digital Field Presentation Technology'. The necessary capabilities are extracted and our approaches and state of the art of realizing these capabilities are introduced in addition to present the state of the art of home application example. The future extension is also illustrated. (author)

  14. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  15. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  16. Electrophysiological signatures of phonological and semantic maintenance in sentence repetition.

    Science.gov (United States)

    Meltzer, Jed A; Kielar, Aneta; Panamsky, Lilia; Links, Kira A; Deschamps, Tiffany; Leigh, Rosie C

    2017-08-01

    Verbal short-term memory comprises resources for phonological rehearsal, which have been characterized anatomically, and for maintenance of semantic information, which are less understood. Sentence repetition tasks tap both processes interactively. To distinguish brain activity involved in phonological vs. semantic maintenance, we recorded magnetoencephalography during a sentence repetition task, incorporating three manipulations emphasizing one mechanism over the other. Participants heard sentences or word lists and attempted to repeat them verbatim after a 5-second delay. After MEG, participants completed a cued recall task testing how much they remembered of each sentence. Greater semantic engagement relative to phonological rehearsal was hypothesized for 1) sentences vs. word lists, 2) concrete vs. abstract sentences, and 3) well recalled vs. poorly recalled sentences. During auditory perception and the memory delay period, we found highly left-lateralized activation in the form of 8-30 Hz event-related desynchronization. Compared to abstract sentences, concrete sentences recruited posterior temporal cortex bilaterally, demonstrating a neural signature for the engagement of visual imagery in sentence maintenance. Maintenance of arbitrary word lists recruited right hemisphere dorsal regions, reflecting increased demands on phonological rehearsal. Sentences that were ultimately poorly recalled in the post-test also elicited extra right hemisphere activation when they were held in short-term memory, suggesting increased demands on phonological resources. Frontal midline theta oscillations also reflected phonological rather than semantic demand, being increased for word lists and poorly recalled sentences. These findings highlight distinct neural resources for phonological and semantic maintenance, with phonological maintenance associated with stronger oscillatory modulations. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. A Study on User-Centered Approach to Design an Augmented Reality Maintenance Support System in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Koo, Jwa Jin; Seong, Poong Hyun

    2007-01-01

    In nuclear power plants (NPPs), as the plants become more reliable and complex, their inspection, maintenance and repair become increasingly challenging problems, and this requires many well experienced and well trained maintenance crew. On the other hands, reduction of life cycle costs of the plants is strongly required, and many crews are required to take charge of various kinds of devices, including their unfamiliar ones. Their task must be done under the strong time pressure of rigid maintenance schedule. This may cause human errors even by even the well experienced crews. Maintenance processes are both very important to guarantee quality for safety and often quite cumbersome. In the case of nuclear power plants, such processes usually demand access to documentation such as technical manuals, either in traditional paper form or electronic form. This is especially important where and when the procedures are performed infrequently. These considerations lead to considering Augmented Reality (AR) systems as an alternative to paper-based systems

  18. Developing a comprehensive training curriculum for integrated predictive maintenance

    Science.gov (United States)

    Wurzbach, Richard N.

    2002-03-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  19. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  20. METHODOLOGICAL FUNDAMENTALS OF DETERMINATION OF UNPOWERED ROLLING STOCK MAINTENANCE CHARACTERISTICS

    Directory of Open Access Journals (Sweden)

    L. A. Muradian

    2016-02-01

    Full Text Available Purpose. The paper involves: 1 confirmation of the technical characteristics of cars and their modifications, as well as indicators of unfailing work probability during the time between overhauls or service hours; 2 improving the methodological approaches to assess the maintenance characteristics of new and modernized equipment of rail transport on the example of not self-propelled rolling stock, namely, railway freight cars; 3 solution of scientific and applied problems in assessment the maintenance characteristics of the new and modernized railway equipment. Methodology. The basic methodological approaches to the assessment of the maintenance characteristics on the example of not self-propelled rolling stock, namely, railway freight cars were considered. The analysis of the reliability of the car, which is considered as a complex mechanical system, where all system elements are connected in series, wherein each element includes m is serially connected parts. The failure of each part of the calculation will result in refusal of the car. Thus, the car is a system without redundancy. Findings. The evaluation technic of the maintenance characteristics of freight cars in controlled operation with taking into account the features of the new generation of cars was improved. Specified: the duration of the tests, the frequency of inspection of the control group of cars controlled by the parameters of the car, the reasons for the early termination of controlled operation. Identified failures in the process of controlled operation are divided according to their nature. Originality. The authors proposed a method of assessing the maintenance characteristics of railway equipment in trial operation as an example of a new generation of freight cars. Practical value. The results allow assessing the maintenance characteristics of new and modernized rail transport equipment during the maintenance test.

  1. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  2. Public Tourism Infrastructure: Challenges in the Development and Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Abdullah Shardy

    2014-01-01

    Full Text Available In Malaysia, the tourism sector is a major contributor to the nation’s development and is spearheaded by the government’s efforts in investing heavily towards providing sufficient and well-functioning public tourism infrastructure. This infrastructure should be ideally developed with a clear and systematic maintenance plan in hand. The challenge herein is not merely providing the necessary infrastructure to sustain tourism activities but rather a pro-active approach towards establishing and subsequently maintaining this infrastructure at its optimal level. The aim of this paper therefore is to identify critical aspects that need to be in place to further enhance the Malaysian tourism industry. The paper discusses the issues and challenges that need to be addressed as a precursor towards an effectively developed and maintained tourism infrastructure system. Development issues that have been identified revolve around the dimensions of quality, quantity and ability of the public agencies involved, particularly issues of inadequate infrastructure, quality of infrastructure and the capability of the agencies in undertaking efficient maintenance activities. These issues were found to lead towards challenges of working with resource constraints, lack of an effective maintenance culture and system as well as the need for clear and effective policies and strategies.

  3. Maintenance Management Systems in the Czech Enterprises of Chemical and Food Industries

    Directory of Open Access Journals (Sweden)

    Lenka Branska

    2016-12-01

    Full Text Available Purpose of the article: The aim of this article is to use the results of the qualitative research to describe the current form of maintenance systems used in enterprises of chemical and food industries, and then to discuss and generalize the results. Methodology/methods: The primary qualitative research was conducted in five companies, which can be regarded as typical representatives of the industries. The main objective of the primary research in individual companies was to determine how they perform the strategic and tactical operational planning of maintenance, implementation of these plans and their control. Individual interviews with respondents were used as the research method. The results of the research were processed using the content analysis method. Subsequently, comparison of the findings from individual businesses and subsequent synthesis thereof was performed, which allowed making generalizations. Scientific aim: The scientific aim of the article is to develop knowledge in the field of maintenance management by specifying the form of the maintenance systems utilized in Czech enterprises of the chemical and food industries and identifying the main opportunities for their improvement. Findings: Czech enterprises of the chemical and food industries utilize maintenance management systems. These systems are aimed at prevention, emphasizing the planning of maintenance activities in fixed periodic intervals. Also, they often utilize diagnostic maintenance. However, the maintenance systems currently used cannot be considered fully operational, with regard to the relatively large volume of after-failure repairs. Conclusions: Production equipment maintenance systems are irreplaceable in chemical and food industry enterprises, but there is great potential for improvement. Improvement should be focused on the area of strategic as well as tactical and operational planning of production equipment maintenance. In terms of strategy, the biggest

  4. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  5. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  6. Post-Occupancy Evaluation Data Support for Planning and Management of Building Maintenance Plans

    Directory of Open Access Journals (Sweden)

    Nelson Bento Pereira

    2016-10-01

    Full Text Available The purpose of this paper is to propose a post-occupancy evaluation (POE method focused on building maintenance and then to test it on two different sets of residential buildings. The paper’s three main goals are: to obtain useful data for optimizing the buildings’ maintenance plans; to search for any correlation between the occupants’ characteristics and their expectations toward the building; to study the occupants’ willingness to pay for maintenance procedures, as well as its correlation with the occupants’ perception of the elements source of maintenance (ESM. The proposed POE method for building maintenance performance evaluation (BMPE consists of six main stages, focusing on the occupants’ opinions and their correlation with the facility manager’s. The observed case studies allowed for a preliminary validation of the POE method for BMPE. Results generically endorsed the method as a valuable tool for the rapprochement between facility management and the building’s end-users. Such findings could allow facility managers to develop more efficient maintenance plans focusing on the occupants’ real needs and expectations, raising occupant satisfaction levels and contributing to the building’s general performance.

  7. Selecting Suitable Candidates for Predictive Maintenance

    NARCIS (Netherlands)

    Tiddens, Wieger Willem; Braaksma, Anne Johannes Jan; Tinga, Tiedo

    2018-01-01

    Predictive maintenance (PdM) or Prognostics and Health Management (PHM) assists in better predicting the future state of physical assets and making timely and better-informed maintenance decisions. Many companies nowadays ambition the implementation of such an advanced maintenance policy. However,

  8. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  9. Machine maintenance: the rules of the game

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    GCO, GMIO, GSPO – ever heard of them? These acronyms stand for the “roles” that best practices identify as vital to successful maintenance management. CERN’s Maintenance Management Project (MMP) team is working with the technical departments to ensure that they implement these procedures when they deal with the maintenance of the collider and its injectors and infrastructure.   The participants of the workshop on asset and maintenance management (AMMW2013), which took place at CERN in November. Since its creation in 2012, CERN’s Maintenance Framework Implementation Office (MFIO) has been promoting the deployment of harmonised maintenance management methods across the BE, GS, EN and TE Departments. “The definition and identification of the Group Coding Officers (GCO), Group Maintenance Information Officers (GMIO) and Group Spare Part Officers (GSPO) are one of the best practices that should be adopted each time a maintenance programme...

  10. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  11. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    OpenAIRE

    Stanislav Vladimirovich Daletskiy; Stanislav Stanislavovich Daletskiy

    2017-01-01

    The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is ...

  12. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  13. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  14. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  15. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  16. On the application of copula in modeling maintenance contract

    International Nuclear Information System (INIS)

    Iskandar, B P; Husniah, H

    2016-01-01

    This paper deals with the application of copula in maintenance contracts for a nonrepayable item. Failures of the item are modeled using a two dimensional approach where age and usage of the item and this requires a bi-variate distribution to modelling failures. When the item fails then corrective maintenance (CM) is minimally repaired. CM can be outsourced to an external agent or done in house. The decision problem for the owner is to find the maximum total profit whilst for the agent is to determine the optimal price of the contract. We obtain the mathematical models of the decision problems for the owner as well as the agent using a Nash game theory formulation. (paper)

  17. The impact of reliability centered maintenance on plant prospects for license renewal

    International Nuclear Information System (INIS)

    Elliott, J.O.; Nakahara, Y.

    1991-01-01

    Much attention has been directed in recent years to means of extending nuclear power plant life. As many plants enter their third decade of service, the questions loom large of how to keep aging plants reliable, as well as how to assure reliability and safety to an extent sufficient to warrant license renewal at the end of the current licensing term. Concurrently the nuclear industry has seen a growing interest in reducing the cost and complexity of maintenance activities while at the same time improving plant reliability and availability. Attainment of these seemingly contradictory aims is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system functions as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on preservation of overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension and license renewal, both for aging plants, and for plants just beginning their first license term

  18. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  19. Nuclear power plant maintenance optimisation SENUF network activity

    International Nuclear Information System (INIS)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P.

    2004-01-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  20. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  1. Sensor/signal monitoring and plant maintenance

    International Nuclear Information System (INIS)

    Ciftcioglu, Oe.; Tuerkcan, E.

    1994-02-01

    Nuclear Power Plant (NPO) availability is determined by the intended functionality of safety related system and components. Therefore, maintenance is an important issue in a power plant connected to the plant's reliability and safety. The traditional maintenance policies proved to be rather costly and even not effectively addressing NPP requirements. Referring to these drawbacks, in the last decade, in the nuclear reliability centered maintenance (RCM) gained substantial interest due to its merits. In the formal implementation of RCM, apparently, predictive maintenance is not considered. However, with the impact of modern real-time and on-line surveillance and monitoring methodologies, the predictive maintenance procedures like sensor/signal verification and validation are to be included into RCM. (orig.)

  2. Building Maintenance Management System for Heritage Museum

    OpenAIRE

    Md Azree Othuman Mydin; Siti Hajar Ismail; Norhidayah Md Ulang

    2012-01-01

    An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, ...

  3. Lifetime oriented maintenance planning in the Netherlands

    NARCIS (Netherlands)

    Straub, A.

    2003-01-01

    In this paper we set up a framework for lifetime oriented maintenance planning as an outcome and input for strategic housing stock management. The maintenance planning holds maintenance activities and costs in the longer term. We consider the maintenance planning as a tool to calculate and implement

  4. Remote maintenance development

    International Nuclear Information System (INIS)

    Zook, C.R.

    1979-01-01

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics

  5. Development of advanced human-machine system for plant operation and maintenance

    International Nuclear Information System (INIS)

    Wu, Wei; Ohi, Tadashi; Yoshikawa, Hidekazu; Sawaragi, Tetsuo; Kitamura, Masaharu; Furuta, Kazuo; Gofuku, Akio; Ito, Koji

    2004-01-01

    With the worldwide deregulation of the power industry, and the aging of the nuclear power plants (NPPs), concerns are growing over the reliability and safety of the NPPs, because the regulation of man power may lower the current high level of reliability and safety. In this paper, a concept of overall integrated plant management mechanism is proposed, in order to meet the requirements of cutting costs of NPPs and the requirements of maintaining or increasing safety and reliability. The concept is called as satellite operation maintenance center (SOMC). SOMC integrates the operation and maintenance activities of several NPP units by utilizing advanced information technologies to support cooperation activities between workers allocated at SOMC and the field workers. As for the operation activities, a framework called as Advanced Operation System (AOS) is proposed in this paper. AOS consists of three support sub-systems: dynamic operation permission system(DyOPS), supervisor information presentation system using interface agent, and crew performance evaluation system. As for the maintenance activities, a framework called as Ubiquitous-Computing-based Maintenance support System (UCMS) is proposed next. Two case studies are described, in order to show the way of how UCMS support field workers to do maintenance tasks efficiently, safely, and infallibly as well. Finally, a prospect of SOMC is shown in order to explain the way of how the technology elements developed in this project could be integrated as a whole one system to support maintenance activities of NPPs in the future. (author)

  6. Structuring AHP-based maintenance policy selection

    NARCIS (Netherlands)

    Goossens, Adriaan; Basten, Robertus Johannes Ida; Hummel, J. Marjan; van der Wegen, Leonardus L.M.

    2015-01-01

    We aim to structure the maintenance policy selection process for ships, using the Analytic Hierarchy Process (AHP). Maintenance is an important contributor to reach the intended life-time of capital technical assets, and it is gaining increasing interest and relevance. A maintenance policy is a

  7. Computerizing Maintenance Management Improves School Processes.

    Science.gov (United States)

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  8. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  9. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  10. Maintenance technologies for reactor internals

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Kenji [Nuclear Energy Systems and Services Div., Toshiba Corp., Tokyo (Japan); Kobayashi, Masahiro [Toshiba Corp., Yokohama (Japan). Keihin Product Operations; Sano, Yuji; Kimura, Seiichiro [Power and Industrial Systems Research and Development Center, Toshiba Corp., Tokyo(Japan)

    2000-10-01

    Toshiba places the highest priority on maintenance technologies for the reactor pressure vessel (RPV) and its internals in operating nuclear power plants. This paper summarizes the status of applied laser maintenance technologies, both preventive and repair. For laser peeing and laser desensitization treatment (LDT) technologies in particular, field applications are also described in detail. In the future, the area of field applications for preventive maintenance, repair, and inspection technologies will be further expanded. (author)

  11. Maintenance & Repair Cost Calculation and Assessment of Resale Value for Different Alternative Commercial Vehicle Powertrain Technologies

    OpenAIRE

    Kleiner, Florian; Friedrich, Horst E.

    2017-01-01

    For detailed evaluation of the Total Cost of Ownership, expenditures for Maintenance & Repair as well as the resale value are important to consider and should not be neglected. However, information on Maintenance & Repair costs as well as residual values for commercial vehicles with alternative powertrains is missing and data on this issue is rare. There is a lack of information and consolidated knowledge. In order to enable a holistic cost assessment for commercial vehicles, a comprehensive ...

  12. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  13. Dry well cooling device

    International Nuclear Information System (INIS)

    Suzuki, Hiroyuki.

    1997-01-01

    A plurality of blowing ports with introduction units are disposed to a plurality of ducts in a dry well, and a cooling unit comprising a cooler, a blower and an isolating valve is disposed outside of the dry well. Cooling air and the atmosphere in the dry well are mixed to form a cooling gas and blown into the dry well to control the temperature. Since the cooling unit is disposed outside of the dry well, the maintenance of the cooling unit can be performed even during the plant operation. In addition, since dampers opened/closed depending on the temperature of the atmosphere are disposed to the introduction units for controlling the temperature of the cooling gas, the temperature of the atmosphere in the dry well can be set to a predetermined level rapidly. Since an axial flow blower is used as the blower of the cooling unit, it can be contained in a ventilation cylinder. Then, the atmosphere in the dry well flowing in the ventilation cylinder can be prevented from leaking to the outside. (N.H.)

  14. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  15. Status of online maintenance in the world

    International Nuclear Information System (INIS)

    Mizumachi, Wataru; Kobayashi, Masahide

    2009-01-01

    In many countries, online maintenance has been already introduced. Especially in US, online maintenance has been introduced to many nuclear plants which has (N+1) redundant safety systems as Japanese plants. There experience will contribute us to discuss how to introduce online maintenance in Japan. In IAEA's nuclear safety criteria and guidance, it is recognized that the outage of one safety system for maintenance is usual operation. This is normal sense in the world. In US, the risk when online maintenance is done is controlled mainly by PRA. We have to discuss how to introduce online maintenance in JAPAN under these conditions in the world. (author)

  16. 14 CFR 145.217 - Contract maintenance.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to an...

  17. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1985-01-01

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  18. Maintenance Approaches for Different Production Methods

    Directory of Open Access Journals (Sweden)

    Mungani, Dzivhuluwani Simon

    2013-11-01

    Full Text Available Various production methods are used in industry to manufacture or produce a variety of products needed by industry and consumers. The nature of a product determines which production method is most suitable or cost-effective. A continuous process is typically used to produce large volumes of liquids or gases. Batch processing is often used for small volumes, such as pharmaceutical products. This paper discusses a research project to determine the relationship between maintenance approaches and production methods. A survey was done to determine to what extent three maintenance approaches reliability-centred maintenance (RCM, total productive maintenance (TPM, and business-centred maintenance (BCM are used for three different processing methods (continuous process, batch process, and a production line method.

  19. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  20. A probabilistic maintenance model for diesel engines

    Science.gov (United States)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  1. The Science of Sustaining Health Behavior Change: The Health Maintenance Consortium

    Science.gov (United States)

    Ory, Marcia G.; Smith, Matthew Lee; Mier, Nelda; Wernicke, Meghan M.

    2013-01-01

    Objective The Health Maintenance Consortium (HMC) is a multisite Grantee Consortium funded by the National Institutes of Health from 2004–2009. The goal of HMC is to enhance understanding of the long-term maintenance of behavior change, as well as effective strategies for achieving sustainable health promotion and disease prevention. Methods This introductory research synthesis prepared by the Resource Center gives context to this theme issue by providing an overview of the HMC and the articles in this journal. Results It explores the contributions to our conceptualization of behavior change processes and intervention strategies, the trajectory of effectiveness of behavioral and social interventions, and factors influencing the long-term maintenance of behavioral and social interventions. Conclusions Future directions for furthering the science of maintaining behavior change and reducing the gaps between research and practice are recommended. PMID:20604691

  2. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  3. Optimal maintenance of a multi-unit system under dependencies

    Science.gov (United States)

    Sung, Ho-Joon

    reputable numerical techniques were used to model the problem as accurately as possible, including algorithms for the MC simulation, imperfect maintenance model from quasi renewal processes, repair time simulation, and state transition rules. Variance Reduction Techniques (VRTs) were also used in an effort to enhance MC simulation efficiency. After accurate MC simulation results are obtained, the RSEs are generated based on the goodness-of-fit measure to yield as parsimonious model as possible to construct the optimization problem. Under the assumption of constant failure rate for lifetime distributions, the inspection interval from the proposed methodology was found to be consistent with the one from the common approach used in industry that leverages Continuous Time Markov Chain (CTMC). While the latter does not consider maintenance cost settings, the proposed methodology enables an operator to consider different types of maintenance cost settings, e.g., inspection cost, system corrective maintenance cost, etc., to result in more flexible maintenance policies. When the proposed methodology was applied to the same TLD of FADEC example, but under the more generalized assumption of strictly Increasing Failure Rate (IFR) for lifetime distribution, it was shown to successfully capture component wear-out, as well as the economic dependencies among the system components.

  4. Advanced maintenance strategies for power plant operators--introducing inter-plant life cycle management

    International Nuclear Information System (INIS)

    Graeber, Ulrich

    2004-01-01

    One of the most important goals of competing power plant operators is to ensure safe operation of their plants, characterized by maximum availability throughout the entire life cycle and minimized specific generating costs. One parameter crucial to the total price of electricity--and one that can be actively influenced by the power plant operators--is maintenance. Up to 30% of all electricity generating costs accrue from maintenance. In the past years maintenance measures have been optimized particularly by the application and continuing development of testing and diagnostic techniques, by the increased level of system and component automation as well as more efficient organization structures. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. But the risks connected to reliability, availability and safety need to be analyzed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realized. The systematic application of condition-based maintenance and the implementation of structured life cycle management are essential requirements. An inter-plant approach is recommended to make a quick implementation of maintenance optimization potentials possible. Plant-specific improvement potentials can be established with the help of a best-practice comparison, and measures and priorities can be defined for realizing them. Creating an inter-plant database will allow experience and findings to be analyzed quickly and efficiently by experts and made available to all participants on a neutral platform. Despite--or maybe owing to--the increasingly competitive marketplace, a sustained reduction in the maintenance costs of power plant operators can only be achieved through a structured, inter-plant exchange of experience. The ZES offers the industry a suitable platform for cooperation with its 'Condition-Based Maintenance' research focus. The introduction

  5. Preventive maintenance and load testing of fixed position cranes in support of major operations

    International Nuclear Information System (INIS)

    Detrick, C.K.

    1980-01-01

    This paper will address load testing and preventive maintenance of fixed in-place cranes in general, and maintenance and load testing of the 200 ton Polar Gantry Crane at the FFTF in particular. This paper also covers the installation of a 100-ton bridge crane in the FFTF's Reactor Service Building, as well as use of these cranes in making important lifts of FFTF equipment

  6. Handy help for maintenance workers

    International Nuclear Information System (INIS)

    Moore, T.

    1994-01-01

    Lightweight, low-cost, color-coded job cards packed with technical reference information and geared to specific types of maintenance and troubleshooting efficiency in nuclear as well as other types of power plants. Developed in conjunction with EPRI's counterpart in Japan, job card sets have been pilot-tested at two operating U.S. nuclear plants and are also being evaluated by Japanese utilities. In addition to their potential for utility customization, job cards could become a new line of EPRI information product that is used directly by the people who inspect and repair equipment in utility power plants

  7. Application of robotic systems to nuclear power plant maintenance tasks

    International Nuclear Information System (INIS)

    Kok, K.D.; Bartilson, B.M.; Rosen, K.L.; Renner, G.F.; Law, T.M.

    1984-01-01

    Robotics technology has developed to where it can provide consistent performance of well-defined tasks. Although nuclear power plant maintenance tasks are characteristically unique, there are some common subtasks which have the consistency required for robots. Several maintenance activities were selected for further study. Concepts for robotic devices and rough scenarios for their use were developed and analyzed for their effect on maintenance costs. The results of the analysis, which was performed using a 10-year life and conservative estimates and procedures, indicate cost savings ranging from $100,000 to $1.5 M in net present value per robot. Projected purchase prices for the robots were less than $200,000. Although the robot concepts used commercially available technology, they are unlike any products either in use or widely required. Robot manufacturers are concentrating on mainstream applications in production, and are unlikely to develop such specialized products. The potential for cost savings indicates that developments should be funded by the nuclear industry

  8. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  9. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

    International Nuclear Information System (INIS)

    MORTIMER, C.S.

    1999-01-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. It sets forth system operation and maintenance as well as failure response procedures

  10. In-vessel remote maintenance of the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Tabor, M.A.; Hager, E.R.; Creedon, R.L.; Fisher, M.V.; Atkin, S.D.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is the first deuterium-tritium (D-T) fusion device that will study the physics of an ignited plasma. The ability of the tokamak vacuum vessel to be maintained remotely while under vacuum has not been fully demonstrated on previous machines, and this ability will be critical to the efficient and safe operation of ignition devices. Although manned entry into the CIT vacuum vessel will be possible during the nonactivated stages of operation, remotely automated equipment will be used to assist in initial assembly of the vessel as well as to maintain all in-vessel components once the D-T burn is achieved. Remote maintenance and operation will be routinely required for replacement of thermal protection tiles, inspection of components, leak detection, and repair welding activities. Conceptual design to support these remote maintenance activities has been integrated with the conceptual design of the in-vessel components to provide a complete and practical remote maintenance system for CIT. The primary remote assembly and maintenance operations on CIT will be accomplished through two dedicated 37- x 100-cm ports on the main toroidal vessel. Each port contains a single articulated boom manipulator (ABM), which is capable of accessing half of the torus. The proposed ABM consists of a movable carriage assembly, telescoping two-part mast, and articulated link sections. 1 ref

  11. Improvement of industrial efficiency by knowledge management in maintenance engineering

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Mariotoni

    2015-09-01

    Full Text Available This article shows research and studies dealing with the management of knowledge in industrial maintenance engineering, developed in the field of applied research in real industrial companies of Europe, which are the consequences of  having knowledge on islands, as well as measures improvements when there is an adequate knowledge management. The peculiarities which are given in the maintenance of the company departments, knowledge of operators and technicians operating in these areas, is heavily based on their experiences (strong tacit component, what is difficult to measure and articulate, and however, on numerous occasions, this break from the knowledge, can impose a high cost for the industry.

  12. Optimization and maintenance tests considering multiple failure modes, aging and imperfect maintenance

    International Nuclear Information System (INIS)

    Martorell, S.; Marton, I.; Sanchez, A.; Carlos, S.

    2014-01-01

    The paper focuses on the optimization of the test and maintenance intervals under the criteria of unavailability or cost including the effect of the aging of the components and models of imperfect maintenance. The results obtained in the case of application, which focuses on a system of safety of a nuclear power station, show differences, mainly in the outage when you consider the aging. (Author)

  13. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  14. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  15. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  16. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Bareiss, J.; Roos, E.; Jovanovic, A.; Perunicic, M.; Balos, D.

    2004-01-01

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.) [de

  17. Buildings Lean Maintenance Implementation Model

    Science.gov (United States)

    Abreu, Antonio; Calado, João; Requeijo, José

    2016-11-01

    Nowadays, companies in global markets have to achieve high levels of performance and competitiveness to stay "alive".Within this assumption, the building maintenance cannot be done in a casual and improvised way due to the costs related. Starting with some discussion about lean management and building maintenance, this paper introduces a model to support the Lean Building Maintenance (LBM) approach. Finally based on a real case study from a Portuguese company, the benefits, challenges and difficulties are presented and discussed.

  18. On-Line Maintenance Methodology Development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyo Won; Kim, Jae Ho; Jae, Moo Sung [Hanyang University, Seoul (Korea, Republic of)

    2012-05-15

    Most of domestic maintenance activities for nuclear power plants are performed while overhaul. Therefore, On-Line Maintenance (OLM) is one of the proper risks informed application techniques for diffusing maintenance burden during overhaul with safety of the plant is secured. The NUMARC 93-01 (Rev.3) presents the OLM state of the art and it provides methodology. This study adopts NUMARC 93-01 (Rev.3) and present OLM. The reference component is Emergency Diesel Generator (EDG) of Ulchin 3, 4

  19. Implementation of maintenance rule for structures

    International Nuclear Information System (INIS)

    Ashar, H.; Bagchi, G.

    1999-01-01

    The maintenance rule, 10 CFR 50.65, 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants', was published by the Nuclear Regulatory Commission (NRC) in the Federal Register (56 FR 31324) on July 10, 1991. The rule became effective on July 10, 1996, giving nuclear power plant licensees 5 years to implement it. During 1994-1995, NRC staff visited nine nuclear power plant sites to observe licensees' preparations for implementation of the rule. The teams found that most of the licensees had not established goals, or performance criteria for monitoring structures at their sites. The licensees contended that the structures were inherently reliable and required no monitoring under the maintenance rule. On the basis of earlier site visits performed by NRC staff to assess the condition of structures, the NRC staff could not accept this contention, and clarified its position in Revision 1 of Regulatory Guide 1.160, 'Monitoring the Effectiveness of Maintenance at Nuclear Power Plants'. This paper discusses the applicability of the maintenance rule criteria for structures and its usefulness in ensuring that the structures, systems, and components within the scope of the maintenance rule are capable of fulfilling their intended functions. Also discussed are the aspects of maintenance rule efforts that could be useful for license renewal applications. (orig.)

  20. Maintenance Free and Sustainable High-Level Control in Cement and Mining Industry

    DEFF Research Database (Denmark)

    Hansen, Ole Fink

    2009-01-01

    High-level control systems have been utilized in the process industry for decades, and also in cement production their use is well established. In comparison to manual control their ability to increase production and quality of end product, while reducing energy consumption and emission, is well...... but nevertheless still require maintenance. For the 10% of the algorithm that is control related, the maintenance issue is to some extent addressed by research topics such as adaptive control, which aim at retuning the parameters of the algorithm to match the changing process. In this project however, it has been...... chosen to focus on the remaining 90% of the algorithm which still require manual modifications to cope with a changed process. Although this issue has gained limited attention from academia so far it is well recognized by the industry. In the process of maintaining an algorithm it has turned out...

  1. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  2. Maximizing Benefits from Maintenance Pemetrexed with Stereotactic Ablative Radiotherapy in Oligoprogressive Non-Squamous Non-Small Cell Lung Cancer

    Directory of Open Access Journals (Sweden)

    Shao-Lun Lu

    2016-08-01

    Full Text Available Maintenance pemetrexed offers survival benefit with well-tolerated toxicities for advanced non-squamous non-small cell lung cancer (NSCLC. We present 3 consecutively enrolled patients with advanced non-squamous NSCLC, receiving stereotactic ablative radiotherapy (SABR for oligoprogressive disease during maintenance pemetrexed. All of them had sustained local control of thoracic oligoprogression after the SABR, while maintenance pemetrexed were kept for additionally long progression-free interval. SABR targeting oligoprogression with continued pemetrexed is an effective and safe approach to extend exposure of maintenance pemetrexed, thus maximizing the benefit from it.

  3. Maintenance strategies and safety on a deregulated market. Mapping of changes in maintenance strategies and their possible consequences

    International Nuclear Information System (INIS)

    Kecklund, Lena

    2004-11-01

    The overall purpose of the project was to make a survey of the changes in the Swedish nuclear power plants over the last five years. There is a risk that nuclear power companies after a deregulation will focus especially on reducing operation and maintenance costs and that the changes could have a negative effect on the reactor safety. The task has involved summarising the actual changes, describing the present situation, the need for future development and the differences between the plants as well as identifying possible reactor safety related risks. The survey has been carried out in a broad perspective, studying the changes in equipment, maintenance strategies and the work situation of the staff. Three case studies were carried out at the Swedish nuclear power plants. Documentation from the companies has been analysed and a selection of in total 27 'informed' employees in different positions have been interviewed in total. The project also included a fourth case study concerning railway traffic. This branch of business is interesting because of its longer experience on a deregulated and competitive market. Conclusions concerning the companies individually as well as similarities and differences between them are presented in this report. Results: There have been more changes both in strategy and organisation in the last five years than during the preceding 5-10-year-period and the pace has been relatively rapid. The deregulation of the electricity market was implemented January 1997 and became the main motive force for the changes. The staffing has been reduced or unchanged and the work demands have increased. The maintenance skills have been redistributed within the organisation. New methods and equipment, i.e. RCM, and programmable systems make increased demands for analytical and theoretical competence. In the short term, job satisfaction and motivation have in some cases been negatively influenced by the new organisation forms, according to several of the

  4. A maintenance performance measurement framework that includesmaintenenace human factors: a case study from the electricity transmission industry

    Directory of Open Access Journals (Sweden)

    Peach, Rina

    2016-08-01

    Full Text Available Over the past two to three decades, maintenance management has undergone a paradigm shift; it is no longer seen as a necessary evil, but as an integral part of the business process that creates value for the organisation. The next step in the evolution of maintenance management is a maintenance performance measurement that includes human factors. The human factors in maintenance are well- known in the aviation industry, as it gained momentum in the early 1990s after a series of serious aviation accidents. Other industries, however, have been slow to integrate the human factor in their maintenance performance measurements. This paper discusses the results of a research project that investigated the use and importance of maintenance management performance measurements that focus specifically on human factors as part of the overall performance management system. From the research presented in this paper, ‘motivation’ and ‘competence’ were identified as the most important human performance factors in the maintenance of electricity transmission systems.

  5. Prevalence of operator fatigue in winter maintenance operations.

    Science.gov (United States)

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. Hidden Semi-Markov Models for Predictive Maintenance

    Directory of Open Access Journals (Sweden)

    Francesco Cartella

    2015-01-01

    Full Text Available Realistic predictive maintenance approaches are essential for condition monitoring and predictive maintenance of industrial machines. In this work, we propose Hidden Semi-Markov Models (HSMMs with (i no constraints on the state duration density function and (ii being applied to continuous or discrete observation. To deal with such a type of HSMM, we also propose modifications to the learning, inference, and prediction algorithms. Finally, automatic model selection has been made possible using the Akaike Information Criterion. This paper describes the theoretical formalization of the model as well as several experiments performed on simulated and real data with the aim of methodology validation. In all performed experiments, the model is able to correctly estimate the current state and to effectively predict the time to a predefined event with a low overall average absolute error. As a consequence, its applicability to real world settings can be beneficial, especially where in real time the Remaining Useful Lifetime (RUL of the machine is calculated.

  7. Enhancing the Wellness of Reserve Forces: A Strategic Challenge

    National Research Council Canada - National Science Library

    Pufal, Sandra

    2001-01-01

    ... maintenance program and the Department of Defense HOOAH4HEALTH promotion program. Wellness is the integration of body, mind, and spirit to produce a balanced lifestyle by practicing good health habits and eliminating harmful ones...

  8. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    Science.gov (United States)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  9. Fast Flux Test Facility (FFTF) maintenance provisions

    International Nuclear Information System (INIS)

    Marshall, J.L.

    1981-05-01

    The Fast Flux Test Facility (FFTF) was designed with maintainability as a primary parameter, and facilities and provisions were designed into the plant to accommodate the maintenance function. This paper describes the FFTF and its systems. Special maintenance equipment and facilities for performing maintenance on radioactive components are discussed. Maintenance provisions designed into the plant to enhance maintainability are also described

  10. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  11. Design and evaluation of augmented reality for nuclear power plant maintenance based on Cognitive activity analysis

    International Nuclear Information System (INIS)

    Koo, Jwa Jin

    2008-02-01

    The goals of maintenance in nuclear power plants (NPPs) are to reduce the number of plant shutdowns, to decrease the shutdown time, to minimize the maintenance costs, and to improve nuclear safety. Furthermore, it is difficult for maintenance personnel to conduct work in NPPs due to the complexity of NPPs, safety issues and time constraints. Human errors should be prevented to achieve maintenance goals in NPPs. Therefore, it is necessary to improve working conditions by introducing support systems. Augmented Reality (AR) has the potential to assist with maintenance tasks and make maintenance personnel concentrate on the tasks, which will then the reduced human error and improve human performance. The working procedure for AR systems was designed based on the characteristics of cognitive activity, and an experiment was conducted to estimate the effectiveness of AR. The results indicated that a well-designed working procedure for AR systems was more effective than a conventional paper-based working procedure. In addition, participants made fewer errors using the designed working procedure. AR systems as maintenance support systems are beneficial technology that can improve maintenance performance by reducing cognitive loads and unnecessary movements. An AR application can be attractive and effective at supporting maintenance task

  12. Special training of craftsmen for maintenance and repair

    International Nuclear Information System (INIS)

    Scholz, H.E.

    1981-01-01

    The most important prerequisites for keeping nuclear power plants running safely and consistently are the reliable plant supervision and control by operators and shift engineers and its permanent servicing and maintenance as well as the performance of qualified repair work. Therefore, sophisticated training of qualified labour in the fields of mechanical engineering, electrical engineering and instrumentation and control is as important as of operators and shift engineers. The objectives of the relevant training measures for the personnel mentioned above are: Acquisition of solid basic skills in the respective professions, development of a broad background in how nuclear power plants are designed and function, gaining a sound insight into the working procedures in nuclear power plants, maintenance planning, duties and responsibilities of personnel involved, and acquiring thorough knowledge of the systems and its components, the assigned staff will be responsible for. (orig./RW)

  13. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  14. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  15. Classifying Desirable Features of Software Visualization Tools for Corrective Maintenance

    NARCIS (Netherlands)

    Sensalire, Mariam; Ogao, Patrick; Telea, Alexandru

    2008-01-01

    We provide an evaluation of 15 software visualization tools applicable to corrective maintenance. The tasks supported as well as the techniques used are presented and graded based on the support level. By analyzing user acceptation of current tools, we aim to help developers to select what to

  16. Proactive maintenance initiatives at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-01-01

    In the late 1980's, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ''mentor'' roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I ampersand C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned

  17. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    Maier, Loran

    2003-01-01

    The Maintenance Proficiency Evaluation Test Bank (MPETB) is an Electric Power Research Institute- (EPRJ-) operated, utility-sponsored means of developing, maintaining, and disseminating secure, high-quality written and performance maintenance proficiency tests. EPRTs charter is to ensure that all tests and test items that go into the Test Bank have been validated, screened for reliability, and evaluated to high standards of psychometric excellence. Proficiency tests of maintenance personnel.(mechanics, electricians, and instrumentation and control [I and C] technicians) are most often used to determine if an experienced employee is capable of performing maintenance tasks without further training. Such tests provide objective evidence for decisions to exempt an employee from what, for the employee, is unnecessary training. This leads to considerable savings in training costs and increased productivity because supervisors can assign personnel to tasks at which their competence is proven. The ultimate objective of proficiency evaluation is to ensure that qualified maintenance personnel are available to meet the maintenance requirements of the plant Numerous task-specific MPE tests (both written and performance) have been developed and validated using the EPRI MPE methodology by the utilities participating in the MPETB project A task-specific MPE consists of a multiple-choice written examination and a multi-step performance evaluation that can be used to assess an individual's present knowledge and skill level for a given maintenance task. The MPETB contains MPEs and test items for the mechanical, electrical, and I and C classifications that are readily available to participating utilities. Presently, utilities are placing emphasis on developing MPEs to evaluate outage-related maintenance tasks that demonstrate the competency and qualifications of plant and contractor personnel before the start of outage work. Utilities are also using the MPE methodology and process to

  18. Dynamic contracting : An asset management tool in controlling infrastructure maintenance activities

    NARCIS (Netherlands)

    Demirel, H.C.; de Ridder, H.A.J.; Hertogh, M.J.C.M.

    2013-01-01

    Infrastructure road network is a complex system in a fast changing complicated environment and therefore subject to change. The changes refer to demands, requirements, regulations and financial possibilities as well as advanced technologies. Therefore outsourcing maintenance activities are rather

  19. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    parameters are presented. Examples are given for minimum periodic maintenance tasks as well as for mechanical inspections and I - C measurements. Diagnostic sheets are also presented

  20. MOSEG code for safety oriented maintenance management Safety of management of maintenance oriented by MOSEG code

    International Nuclear Information System (INIS)

    Torres Valle, Antonio

    2005-01-01

    Full text: One of the main reasons that makes maintenance contribute highly when facing safety problems and facilities availability is the lack of maintenance management systems to solve these fields in a balanced way. Their main setbacks are shown in this paper. It briefly describes the development of an integrating algorithm for a safety and availability-oriented maintenance management by virtue of the MOSEG Win 1.0 code. (author)

  1. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    introduced for the categorization and statistical treatments such as Common Cause Failure analyses and Bayesian update. The web-based reliability database system would be useful not only for PSA and Risk Informed Application, but for the plant operation and maintenance optimization. Furthermore, the database system would effectively support the development and application of Preventive Maintenance (PM) template, implementation of Maintenance Rule, and Equipment Reliability (ER) improvement program as well

  2. Maintenance of radiation monitoring systems

    International Nuclear Information System (INIS)

    Aoyama, Kei

    2001-01-01

    As the safety and quality of atomic power facilities are more strongly required, the reliability improvement and preventive maintenance of radiation monitoring systems are important. This paper describes the maintenance of radiation monitoring systems delivered by Fuji Electric and the present status of preventive maintenance technology. Also it introduces the case that we developed a fault diagnosis function adopting a statistics technique and artificial intelligence (AI) and delivered a radiation monitoring system including this function. This system can output a fault analysis result and a countermeasure from the computer in real time. (author)

  3. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  4. Conceptual design main progress of EAST Articulated Maintenance Arm (EAMA) system

    Energy Technology Data Exchange (ETDEWEB)

    Shi, Shanshuang, E-mail: shiss@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Laboratory of Intelligent Machines, Lappeenranta University of Technology (Finland); Song, Yuntao; Cheng, Yong [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Villedieu, Eric; Bruno, Vincent [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France); Feng, Hansheng [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Wu, Huapeng [Laboratory of Intelligent Machines, Lappeenranta University of Technology (Finland); Wang, Peng [State Key Laboratory of Solid Lubrication, Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences, Lanzhou 730000 (China); Hao, Zhiwei; Li, Yang; Wang, Kun; Pan, Hongtao [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China)

    2016-03-15

    Highlights: • EAST Articulated Maintenance Arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM. • Conceptual design for a 3-DOF wrist end effector with gripper has been finished. • Kinematic design can reach 90% of the workspace inside EAST tokamak vessel. • A prototype of EAMA arm segment has been built to validate the design. - Abstract: EAST articulated maintenance arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM for the purpose of remote inspection and simple maintenance operations in EAST vacuum vessel during physical experiments without breaking the ultra-high vacuum condition. The EAMA system design is based on a similar articulated inspection arm robot successfully demonstrated in Tore Supra in 2008. In order to better meet EAST configurations and maintenance requirements, optimized mechanisms and dimensions are considered for EAMA robot as upgrades. Besides, the segmented arm is equipped with a 3-DOF wrist end effector and gripper for gripping operation as well as inspection. Some calculations and simulations on statics, kinematics and workspace of EAMA have been presented to validate the feasibility. This paper introduces the overall design of the EAMA robot and presents implementation progress.

  5. Conceptual design main progress of EAST Articulated Maintenance Arm (EAMA) system

    International Nuclear Information System (INIS)

    Shi, Shanshuang; Song, Yuntao; Cheng, Yong; Villedieu, Eric; Bruno, Vincent; Feng, Hansheng; Wu, Huapeng; Wang, Peng; Hao, Zhiwei; Li, Yang; Wang, Kun; Pan, Hongtao

    2016-01-01

    Highlights: • EAST Articulated Maintenance Arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM. • Conceptual design for a 3-DOF wrist end effector with gripper has been finished. • Kinematic design can reach 90% of the workspace inside EAST tokamak vessel. • A prototype of EAMA arm segment has been built to validate the design. - Abstract: EAST articulated maintenance arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM for the purpose of remote inspection and simple maintenance operations in EAST vacuum vessel during physical experiments without breaking the ultra-high vacuum condition. The EAMA system design is based on a similar articulated inspection arm robot successfully demonstrated in Tore Supra in 2008. In order to better meet EAST configurations and maintenance requirements, optimized mechanisms and dimensions are considered for EAMA robot as upgrades. Besides, the segmented arm is equipped with a 3-DOF wrist end effector and gripper for gripping operation as well as inspection. Some calculations and simulations on statics, kinematics and workspace of EAMA have been presented to validate the feasibility. This paper introduces the overall design of the EAMA robot and presents implementation progress.

  6. Increasing the competitiveness of maintenance contract rates by using an alternative methodology for the calculation of average vehicle maintenance costs

    Directory of Open Access Journals (Sweden)

    Stephen Carstens

    2008-11-01

    Full Text Available Companies tend to outsource transport to fleet management companies to increase efficiencies if transport is a non-core activity. The provision of fleet management services on contract introduces a certain amount of financial risk to the fleet management company, specifically fixed rate maintenance contracts. The quoted rate needs to be sufficient and also competitive in the market. Currently the quoted maintenance rates are based on the maintenance specifications of the manufacturer and the risk management approach of the fleet management company. This is usually reflected in a contingency that is included in the quoted maintenance rate. An alternative methodology for calculating the average maintenance cost for a vehicle fleet is proposed based on the actual maintenance expenditures of the vehicles and accepted statistical techniques. The proposed methodology results in accurate estimates (and associated confidence limits of the true average maintenance cost and can beused as a basis for the maintenance quote.

  7. Recent Research on Language Maintenance.

    Science.gov (United States)

    Garcia, MaryEllen

    2003-01-01

    Describes recent research on language maintenance to provide broad, worldwide coverage of different language contact situations. Surveys various countries in which research within ethnic and minority language communities illuminates language maintenance or shift, or revitalization, for that group. (Author/VWL)

  8. Nuclear power plant maintenance optimisation SENUF network activity

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P. [Inst. for Energy, EC DG Joint Research Centre, Petten (Netherlands)

    2004-07-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  9. Identifying Human Factors Issues in Aircraft Maintenance Operations

    Science.gov (United States)

    Veinott, Elizabeth S.; Kanki, Barbara G.; Shafto, Michael G. (Technical Monitor)

    1995-01-01

    Maintenance operations incidents submitted to the Aviation Safety Reporting System (ASRS) between 1986-1992 were systematically analyzed in order to identify issues relevant to human factors and crew coordination. This exploratory analysis involved 95 ASRS reports which represented a wide range of maintenance incidents. The reports were coded and analyzed according to the type of error (e.g, wrong part, procedural error, non-procedural error), contributing factors (e.g., individual, within-team, cross-team, procedure, tools), result of the error (e.g., aircraft damage or not) as well as the operational impact (e.g., aircraft flown to destination, air return, delay at gate). The main findings indicate that procedural errors were most common (48.4%) and that individual and team actions contributed to the errors in more than 50% of the cases. As for operational results, most errors were either corrected after landing at the destination (51.6%) or required the flight crew to stop enroute (29.5%). Interactions among these variables are also discussed. This analysis is a first step toward developing a taxonomy of crew coordination problems in maintenance. By understanding what variables are important and how they are interrelated, we may develop intervention strategies that are better tailored to the human factor issues involved.

  10. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described

  11. A test case of computer aided motion planning for nuclear maintenance operation

    International Nuclear Information System (INIS)

    Schmitzberger, E.; Bouchet, J.L.; Schmitzberger, E.

    2001-01-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  12. The impact of embedded total productive maintenance with six ...

    African Journals Online (AJOL)

    The purpose of the work presented in this paper is to capture the current state of Six Sigma and Total Productive Maintenance (TPM) as well as to propose the embedded approach of Six Sigma and TPM on improving supply chain performance. The approach to this paper is to answer the questions such as “how does TPM ...

  13. Maintenance Mentor

    National Research Council Canada - National Science Library

    Jacobs, John

    2003-01-01

    Maintenance Mentor (MXM) is a research effort conducted by a joint AFRL/HESR and Northrop Grumman Information Technology team to identify the basic, high-level requirements necessary for improving flight line diagnostic capabilities...

  14. The contributions of human factors on human error in Malaysia aviation maintenance industries

    Science.gov (United States)

    Padil, H.; Said, M. N.; Azizan, A.

    2018-05-01

    Aviation maintenance is a multitasking activity in which individuals perform varied tasks under constant pressure to meet deadlines as well as challenging work conditions. These situational characteristics combined with human factors can lead to various types of human related errors. The primary objective of this research is to develop a structural relationship model that incorporates human factors, organizational factors, and their impact on human errors in aviation maintenance. Towards that end, a questionnaire was developed which was administered to Malaysian aviation maintenance professionals. Structural Equation Modelling (SEM) approach was used in this study utilizing AMOS software. Results showed that there were a significant relationship of human factors on human errors and were tested in the model. Human factors had a partial effect on organizational factors while organizational factors had a direct and positive impact on human errors. It was also revealed that organizational factors contributed to human errors when coupled with human factors construct. This study has contributed to the advancement of knowledge on human factors effecting safety and has provided guidelines for improving human factors performance relating to aviation maintenance activities and could be used as a reference for improving safety performance in the Malaysian aviation maintenance companies.

  15. Towards Agile Ontology Maintenance

    Science.gov (United States)

    Luczak-Rösch, Markus

    Ontologies are an appropriate means to represent knowledge on the Web. Research on ontology engineering reached practices for an integrative lifecycle support. However, a broader success of ontologies in Web-based information systems remains unreached while the more lightweight semantic approaches are rather successful. We assume, paired with the emerging trend of services and microservices on the Web, new dynamic scenarios gain momentum in which a shared knowledge base is made available to several dynamically changing services with disparate requirements. Our work envisions a step towards such a dynamic scenario in which an ontology adapts to the requirements of the accessing services and applications as well as the user's needs in an agile way and reduces the experts' involvement in ontology maintenance processes.

  16. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  17. Achieving world class maintenance status

    Energy Technology Data Exchange (ETDEWEB)

    Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

    2007-08-15

    The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

  18. Conceptualization of an intellectual maintenance management system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yonekawa, Tsuyoshi; Yoshikawa, Shinji; Ozawa, Kenji

    1997-04-01

    It is studied in many research institute to enhance availability and safety of nuclear power plants operation and maintenance. On this account, development of autonomous plants has been carried out to replace the role of operators with artificial intelligence and autonomous robots. We have been developing an intellectual maintenance management system since 1994. As the first step, concept of an intellectual maintenance management system was constructed. The intellectual maintenance managerial system is in charge of maintenance function of an autonomous plant. The intellectual maintenance managerial system has three functions which is monitoring state and judging abnormal machine and deciding maintenance plan by autonomy. This system has an important role of indication and communication of the result to an autonomous operation system and autonomous robot. In this examination, we adopted the distributed and cooperative system technique by multi-agent of AI technology and examined a method to enforce problem solving by cooperation of sensor and actuator. In this report, we examined trouble detection and troubleshooting evaluation and maintenance plan decision function by the distributed and cooperative system technology, the distributed and cooperative system communication-function that these information releases functions was taken on. In conceptualization of the intellectual maintenance managerial system, we clarified of major functions to constitute this system and relation between autonomous operation system and autonomous robots. We clarified the information exchange scheme between this system and an outside system furthermore. In future, we will prototype each function and inspect the total system. (author)

  19. Computer assisted procedure maintenance

    International Nuclear Information System (INIS)

    Bisio, R.; Hulsund, J. E.; Nilsen, S.

    2004-04-01

    The maintenance of operating procedures in a NPP is a tedious and complicated task. Through the whole life cycle of the procedures they will be dynamic, 'living' documents. Several aspects of the procedure must be considered in a revision process. Pertinent details and attributes of the procedure must be checked. An organizational structure must be created and responsibilities allotted for drafting, revising, reviewing and publishing procedures. Available powerful computer technology provides solutions within document management and computerisation of procedures. These solutions can also support the maintenance of procedures. Not all parts of the procedure life cycle are equally amenable to computerized support. This report looks at the procedure life cycle in todays NPPs and discusses the possibilities associated with introduction of computer technology to assist the maintenance of procedures. (Author)

  20. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  1. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  2. Analysis of the Determinant Factors Development of Maintenance Culture in Malaysian Local Authorities

    Directory of Open Access Journals (Sweden)

    Sani S.I.A.

    2014-01-01

    Full Text Available Malaysia is a fast growing developing country and its vision is becoming a developed country with a first class infrastructure. Towards this vision, the assets and facilities were developed, owned or leased by public sector especially buildings, constructions and infrastructures to fulfill administrative and social needs as well as economic responsibilities to general public. In Malaysia, public asset and facilities is owned by three major levels of government, which are the federal government, state government and the local government also known as local authority. Between these three forms of government, Local Authorities hold a large number of facilities that place demands on resources. They have a responsibility to use and maintain a wide range of property assets including classified and heritage buildings, single purpose facilities and state of the art multipurpose facilities. Over the years, the local authorities in Malaysia currently have been soundly criticized by public caused poor maintenance culture. The assets especially public buildings and infrastructures are not maintained properly. Thus, developing the maintenance culture is essential to increase the awareness about maintenance activity on public facilities and assets in Malaysian Local Authorities. Regarding this scenario, the purpose of this study is to determine the determinant factors affecting development of maintenance culture identified based on the review of previous research. As a guide to achieve the research objective, a questionnaire survey was conducted to investigate the significance of ten determinant factors identified in the research study and their related affecting to development of maintenance culture in local authority as a respondent in this research. The collected data was then analyzed using quantitative approaches such as mean analysis, relative important index as well as others.

  3. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  4. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  5. Evaluation and Selection of Renewable Energy Technologies for Highway Maintenance Facilities

    Science.gov (United States)

    Andrews, Taylor

    The interest in renewable energy has been increasing in recent years as attempts to reduce energy costs as well the consumption of fossil fuels are becoming more common. Companies and organizations are recognizing the increasing reliance on limited fossil fuels' resources, and as competition and costs for these resources grow, alternative solutions are becoming more appealing. Many federally run buildings and associations also have the added pressure of meeting the mandates of federal energy policies that dictate specific savings or reductions. Federal highway maintenance facilities run by the Department of Transportation fall into this category. To help meet energy saving goals, an investigation into potential renewable energy technologies was completed for the Ohio Department of Transportation. This research examined several types of renewable energy technologies and the major factors that affect their performance and evaluated their potential for implementation at highway maintenance facilities. Facilities energy usage data were provided, and a facility survey and site visits were completed to enhance the evaluation of technologies and the suitability for specific projects. Findings and technology recommendations were presented in the form of selection matrices, which were designed to help make selections in future projects. The benefits of utilization of other tools such as analysis software and life cycle assessments were also highlighted. These selection tools were designed to be helpful guides when beginning the pursuit of a renewable energy technology for highway maintenance facilities, and can be applied to other similar building types and projects. This document further discusses the research strategies and findings as well as the recommendations that were made to the personnel overseeing Ohio's highway maintenance facilities.

  6. Numerical study of inventory management under various maintenance policies

    NARCIS (Netherlands)

    Poppe, J.; Basten, R.J.I.; Boute, R.N.; Lambrecht, M.R.

    2017-01-01

    Capital assets, such as manufacturing equipment, require maintenance to remain functioning. Maintenance can be performed when a component breaks down and needs replacement (i.e., corrective maintenance), or the maintenance and part replacement can be performed preventively. Preventive maintenance

  7. AC maintenance and repair manual for diesel engines

    CERN Document Server

    Pallas, Jean-Luc

    2013-01-01

    The aim of this book with its detailed step-by-step colour photographs and diagrams, is to enable every owner to fix their diesel engine with ease. Troubleshooting tables help diagnose potential problems, and there is advice on regular maintenance and winterising and repair. Jean-Luc Pallas's enthusiasm for passing on his knowledge, as well as his clear explanations, precise advice and step-by-step instructions make this a unique book.

  8. HOUSING MAINTENANCE AND UTILITIES BOARD OF PENZA REGION IN 1950–1980 FROM THE POPULATION’S VIEW

    Directory of Open Access Journals (Sweden)

    Aleksandr Anatol’evich Gushchin

    2018-02-01

    Full Text Available Purpose. The aim of the article is to analyze the housing conditions and housing maintenance and utilities board of Penza Region in 1950–1980, as well as their perception in population’s historical memory. Methodology. We’ve used scientific, objective and historical principles. We’ve used general scientific methods: analysis, comparison, generalization; as well as the historical research methods: problematic-chronological and comparative-historical. Results. The research shows that in Penza region the housing conditions in 1950–1980 has become better. However, there were some same problems, e.g. the quality of housing, the availability of running water, gas, central heating, and canalization. Besides, the work of housing maintenance and utilities board gave rise to unfavorable criticism. The attitude to housing conditions, housing maintenance and utilities board, existing in population’s historical memory, corresponded to the real data. Practical implications. The results can be applied in special courses in Russian History, as well as in other historical disciplines.

  9. Maintenance, reliability and policies for orbital space station life support systems

    International Nuclear Information System (INIS)

    Russell, James F.; Klaus, David M.

    2007-01-01

    The performance of productive work on space missions is critical to sustaining a human presence on orbital space stations (OSS), the Moon, or Mars. Available time for productive work has potentially been impacted on past OSS missions by underestimating the crew time needed to maintain systems, such as the Environmental Control and Life Support System (ECLSS). To determine the cause of this apparent disconnect between the design and operation of an OSS, documented crew time for maintenance was collected from the three Skylab missions and Increments 4-8 on the International Space Station (ISS), and the data was contrasted to terrestrial facility maintenance norms. The results of the ISS analysis showed that for four operational and seven functional categories, the largest deviation of 60.4% over the design time was caused by three of the four operational categories not being quantitatively included in the design documents. In a cross category analysis, 35.3% of the crew time was found to have been used to repair air and waste handling systems. The air system required additional crew time for maintenance due to a greater than expected failure rate and resultant increased time needed for repairs. Therefore, it appears that the disconnect between the design time and actual operations for ECLSS maintenance on ISS was caused by excluding non-repair activities from the estimates and experiencing greater than expected technology maintenance requirements. Based on these ISS and Skylab analyses, future OSS designs (and possibly lunar and Martian missions as well) should consider 3.0-3.3 h/day for crews of 2 to 3 as a baseline of crew time needed for ECLSS maintenance

  10. Maintenance considerations of the STARFIRE commercial tokamak

    International Nuclear Information System (INIS)

    Trachsel, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    This paper presents the maintenance approach, the commercial tokamak design features that enhance maintenance and preliminary repair time and required mean-time-between-failures for major subsystems. Reactor hall building and maintenance equipment requirements including hot cells, coil rewinding, and cranes are discussed

  11. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  12. PFP MICON maintenance manual. Revision 1

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    This manual covers the use of maintenance displays, maintenance procedures, system alarms and common system failures. This manual is intended to supplement the MICON maintenance training not replace it. It also assumes that the user is familiar with the normal operation of the MICON A/S system. The MICON system is a distributed control computer and, among other things, controls the HVAC system for the Plutonium Finishing Plant

  13. Tandem mirror next step: remote maintenance

    International Nuclear Information System (INIS)

    Doggett, J.N.; Damm, C.C.; Hanson, C.L.

    1980-01-01

    This study of the next proposed experiment in the Mirror Fusion Program, the Tandem Mirror Next Step (TMNS), has included serious consideration of the maintenance requirements of such a large source of high energy neutrons with its attendant throughput of tritium. Although maintenance will be costly in time and money, our conclusion is that with careful attention to a design for maintenance plan such a device can be reliably operated

  14. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  15. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  16. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  17. Maintenance, repair and operation (MRO) of shutdown facilities

    International Nuclear Information System (INIS)

    Kenny, S.

    2006-01-01

    What level of maintenance does one apply to a shutdown facility? Well it depends on who you ask. Operations staff sees facilities that have completed their useful life cycle as a cost drain while Decommissioning staff sees this as the start of a new life cycle. Based on the decommissioning plan for the particular facility the building could complete another full life cycle while under decommissioning whether it is in storage with surveillance mode or under active decommissioning. This paper will explore how you maintain a facility and systems for many years after its useful life until final decommissioning is completed. When a building is declared redundant, who looks after it until the final decommissioning end state is achieved? At the AECL, Chalk River Labs site the safe shutdown and turnover process is one key element that initiates the decommissioning process. The real trick is orchestrating maintenance, repair and operation plans for a facility that has been poorly invested in during its last years of useful life cycle. To add to that usually shutdowns are prolonged for many years beyond the expected turnover period. During this presentation I will cover what AECL is doing to ensure that the facilities are maintained in a proper state until final decommissioning can be completed. All facilities or systems travel through the same life cycle, design, construction, commissioning, operation, shutdown and demolition. As we all know, nuclear facilities add one more interesting twist to this life cycle called Decommissioning that lands between shutdown and demolition. As a facility nears the shutdown phase, operations staff loose interest in the facility and stop investing in upgrades, repairs and maintenance but continue to invest and focus on maximizing operations. Facility maintenance standards produced by the International Facility Maintenance Association (IFMA) based on a survey done every year state that 2.2% of the total operating costs for the site should be

  18. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Myburgh, Corrie; Brandborg-Olsen, Dorthe; Albert, Hanne

    2013-01-01

    To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics.......To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics....

  19. CaMKII Requirement for in Vivo Insular Cortex LTP Maintenance and CTA Memory Persistence

    Directory of Open Access Journals (Sweden)

    Yectivani Juárez-Muñoz

    2017-11-01

    Full Text Available Calcium-calmodulin/dependent protein kinase II (CaMKII plays an essential role in LTP induction, but since it has the capacity to remain persistently activated even after the decay of external stimuli it has been proposed that it can also be necessary for LTP maintenance and therefore for memory persistence. It has been shown that basolateral amygdaloid nucleus (Bla stimulation induces long-term potentiation (LTP in the insular cortex (IC, a neocortical region implicated in the acquisition and retention of conditioned taste aversion (CTA. Our previous studies have demonstrated that induction of LTP in the Bla-IC pathway before CTA training increased the retention of this task. Although it is known that IC-LTP induction and CTA consolidation share similar molecular mechanisms, little is known about the molecular actors that underlie their maintenance. The purpose of the present study was to evaluate the role of CaMKII in the maintenance of in vivo Bla-IC LTP as well as in the persistence of CTA long-term memory (LTM. Our results show that acute microinfusion of myr-CaMKIINtide, a selective inhibitor of CaMKII, in the IC of adult rats during the late-phase of in vivo Bla-IC LTP blocked its maintenance. Moreover, the intracortical inhibition of CaMKII 24 h after CTA acquisition impairs CTA-LTM persistence. Together these results indicate that CaMKII is a central key component for the maintenance of neocortical synaptic plasticity as well as for persistence of CTA-LTM.

  20. Thermoeconomic studies applied to maintenance of power plants

    International Nuclear Information System (INIS)

    Carvalho, F.R.; Horta Nogueira, L.A.

    1996-01-01

    The thermoeconomic method is an important tool aiming to improve maintenance activities in steam power plants, becoming possible to share the irreversibilities costs to each equipment, as boilers, turbines and heat exchangers. Furthermore, the effects related to changes in operational and design parameters can be studied in a detailed way, evaluating the local and distributed effects. In this work, after a brief review of power plant maintenance costs concepts and values, one address a methodology for maintenance costs estimation and develops a case study of thermoeconomics of a hypothetical plant, presenting the exergy flows, exergy losses and maintenance costs distribution. Also is presented an evaluation of exergoeconomic maintenance cost, evaluating their significance, at equipment level, related to overall maintenance cost, aiming to help the maintenance activities planning. 10 refs, 3 figs, 12 tabs

  1. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  2. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  3. Regulatory oversight of maintenance activities at nuclear power plants in France

    International Nuclear Information System (INIS)

    Bouton, J.P.; Lallement, J.

    1997-01-01

    In France the nuclear safety authority sets out the main safety objectives but the operator remains the first responsible for the NPP safety. During the operation, operators have to demonstrate that the safety level remains the same as defined in the design studies. Maintenance contributes to meet this objective. The French regulation insists on the quality of the safety related components maintenance, especially in the 1984 order. All gap between results and requirements have to be analyzed by operator who provide feedback measures to avoid similar failure to occur. This gap have to be mentioned to regulators. The use of probabilistic safety analysis (PSA) and reliability centered maintenance (RCM) methods is not well developed in France to optimize maintenance. For the French regulatory, the major difficulties in the use of PSA are: The impossibility to detect unanticipated failure mode; the validity of the input data; the validity of model use, based on ''engineering judgement''. For the specific case of passive components inspection, such as the vessel of the primary circuit, the French regulator has already indicated to the operator that the optimization of maintenance by use of PSA cannot be used, for the following reasons: The safety analysis does not take into account the failure of the vessel; unanticipated failure modes have already damaged part of the primary circuit; the use of defense in depth concept requires a systematic detection of any defect on the vessel. (author)

  4. TRUPACT-II procedures and maintenance instructions

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this document is to provide the technical requirements for operation, inspection and maintenance of a TRUPACT-II Shipping Package and directly related components. This document shall supply the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP (NRC Certificate of Compliance No. 9218), the TRUPACT-II SARP shall govern. This document details the operations, maintenance, repair, replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container. These procedures may be modified for site use, but as a minimum all parameters and format listed herein must be included in any site modified version. For convenience and where applicable steps may be performed out of sequence. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the minimum required procedures for use of the adjustable center of gravity lift fixture and the TRUPACT-II transport trailer in conjunction with the TRUPACT-II Packaging

  5. Current Situation of Highway Daily Maintenance Management in Beijing

    Directory of Open Access Journals (Sweden)

    Pan Feng Ming

    2016-01-01

    Full Text Available Combined with the industry property, characteristics and management needs of highway maintenance project in Beijing, through investigation and research of the highway daily maintenance management, the present situation of highway repair and maintenance is expounded from the aspects such as the determination of maintenance funds and plan, maintenance management mode, and so on. Then in order to explore the new mechanisms for market management of highway maintenance, the advantages and disadvantages of highway maintenance and minor repairment of Beijing are analyzed.

  6. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  7. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  8. 25 CFR 170.812 - What is emergency maintenance?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is emergency maintenance? 170.812 Section 170.812 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.812 What is emergency maintenance? Emergency maintenance is work that...

  9. Conditions of job performance quality during nuclear reactor maintenance

    International Nuclear Information System (INIS)

    Babos, K.; Takacs, J.

    1991-01-01

    The education and training programs of the maintenance personnel at the Paks Nuclear Power Plant, Hungary are described. In addition to well trained personnel, the conditions of job quality involves the preparation of job by proper check lists and availability of documentation, and the inspection and checking of the accomplishment of job tasks. Such an inspection procedure is proposed. (R.P.) 2 figs

  10. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  11. Education as a Basic Element of Improving Professional Important Qualities of Aviation Technical Maintenance Personnel

    Directory of Open Access Journals (Sweden)

    Gorbačovs Oļegs

    2016-12-01

    Full Text Available In this article the importance of professional qualities, competence and their increase, directly dependent on the training of aviation technical maintenance personnel and determination the level of flight safety is covered. This publication analyses necessary training and requirements for aviation technical personnel involved in aircraft maintenance, as well as the requirements for aviation training organizations, defined as per Part-147, for such personnel preparation and training.

  12. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  13. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  14. FAA Certificated Maintenance Agencies Directory (1997)

    Science.gov (United States)

    1997-05-06

    This advisory circular (AC) transmits a consolidated directory of all : certificated Federal Aviation Administration (FAA) repair stations and : manufacturer's maintenance facilities. The repair stations and manufacturer's : maintenance facilities we...

  15. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  16. 49 CFR 214.341 - Roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  17. Cognitive impairment in methadone maintenance patients.

    Science.gov (United States)

    Mintzer, Miriam Z; Stitzer, Maxine L

    2002-06-01

    Few well-controlled studies have examined psychomotor and cognitive performance in methadone maintenance patients (MMP). In the present study, performance of 18 opioid-dependent MMP was evaluated relative to that of 21 control participants without substance abuse histories. The MMP and control groups were balanced with respect to gender, race, age, years of education, current employment status, current reading level, and estimated IQ score. Recent drug abstinence was verified by urine testing. Participants with a urine screen positive for benzodiazepines or a breathalyzer test positive for alcohol prior to performance testing were excluded. To avoid testing under conditions of acute heroin or cocaine intoxication, but without testing under conditions of acute withdrawal, participants with current use of heroin or cocaine were only required to abstain for 24 h prior to performance testing. MMP exhibited impairment relative to controls in psychomotor speed (digit symbol substitution and trail-making tests), working memory (two-back task), decision making (gambling task), and metamemory (confidence ratings on a recognition memory test); results also suggested possible impairment in inhibitory mechanisms (Stroop color-word paradigm). MMP did not exhibit impairment in time estimation, conceptual flexibility or long-term memory. The wide range of impaired functions is striking, and may have important implications for daily functioning in MMP. Further research is necessary to determine the clinical significance of the impairments in laboratory-based tests for daily performance in the natural environment, as well as to differentiate impairments due to acute methadone dosing, chronic methadone maintenance, chronic poly-drug abuse, and other factors. Copyright 2002 Elsevier Science Irealnd Ltd.

  18. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  19. New activities in nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Mico, F.; Specht, J.

    2006-01-01

    This article addresses the consequences of the progressive deregulation of the electricity market of several key countries on the maintenance practices and techniques face to the growing pressures on O and M costs. The responses of the nuclear maintenance industry to make maintenance activities more efficient maintaining if not enhancing the safety of NPP's are briefly described. The article also analyses the potential impact of shortage of experience maintenance personnel to serve the NPP's in the future as some countries are already experiencing. (Author)

  20. Maintenance considerations of the Starfire Commercial Tokamak

    International Nuclear Information System (INIS)

    Trachael, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    An initial reactor design has been developed for the Starfire Tokamak reactor that incorporates maintenance features to permit reactor and plant operation with a 75% availability. All components of the reactor can be replaced utilizing highly automated remote maintenance techniques. Provisions for contact maintenance are included but would only be utilized on a contingency basis since it is believed that allowable dose rates will be decreased in future years. A modular design approach is used for the reactor and auxiliary subsystems to permit efficient use of remote maintenance. The modular approach minimizes the number of different maintenance operations required and can result in use of simple tasks such as push, pull, turn, etc., maneuvers for module removal. Fault isolation is provided for each replaceable module

  1. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  2. Strategije održavanja tehničkih sistema / Technical system maintenance strategies

    Directory of Open Access Journals (Sweden)

    Petar Stanojević

    2003-11-01

    Full Text Available U ovom radu dat je pregled novih naučnih saznanja koja su dovela do promena u sadržaju strategija koje se mogu primeniti u sistemu održavanja tehničkih sistema. Analizirana je suština relevantnih strategija održavanja, prednosti nedostatci i efekti koje nosi njihova primena. / This paper gives a survey of recent scientific achievements which has brought changes into the strategies applicable in technical system maintenance systems. The essence of relevant maintenance strategies has been analyzed as well as the advantages disadvantages and effects of their application.

  3. The maintenance management for lean organization

    Directory of Open Access Journals (Sweden)

    Daniel D. GEORGESCU

    2010-12-01

    Full Text Available The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvement program; instantaneous maintenance; improvement setup operations. In the spirit of Lean principle, Lean TPM adjusts overall equipment effectiveness concept for all supply-chain from supplier to customer. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind Lean TPM.

  4. The human factor in maintenance work

    International Nuclear Information System (INIS)

    Hansson, B.

    1996-01-01

    In most of the maintenance works performed at operating plants, the personnel is the warranty for both efficient performance and good quality. To reach the right quality level in performance, the personnel needs adequate tools and of course a maintenance strategy and an organisation that supports the efficient work. The human factor is mostly referred to when something went wrong and analyses are done. There is a great potential of doing preventive analysis. The presentation will focus on experience in this field and what has been done at Barsebaeck NPP to analyse and improve the maintenance work. As maintenance work can't be seen as an isolated area, the rest of the plant organisation is included in the presentation. (author) figs., tabs

  5. Early implementation of the Maintenance Rule

    International Nuclear Information System (INIS)

    Green, J.R.

    1995-01-01

    On July 10, 1991, the U.S. Nuclear Regulatory Commission (NRC) published the Maintenance Rule as Section 50.65 of 10 CFR 50. The purpose of the Maintenance Rule is to ensure that the effectiveness of maintenance activities is assessed on an ongoing basis in a manner that ensures key structures, systems, and components are capable of performing their intended function. Full implementation of the rule is required by July 10, 1996. On May 31, 1994, the NRC published Generic Letter 94-01, which allowed removal of technical specification accelerated testing and special reporting requirements for emergency diesel generators provided a program is implemented for monitoring and maintaining emergency diesel generator performance consistent with the provisions of the Maintenance Rule

  6. Safety of nuclear operation and maintenance

    International Nuclear Information System (INIS)

    Mori, M.; Nitta, T.; Sakai, K.

    1994-01-01

    The Kansai Electric Power Co. Inc.(Kansai EPC) aims to pursue a high quality and highly reliable operation in nuclear power generation in order to ensure safety by reducing the risk of accidents and win the confidence from the society and the public. It is emphasised that in order to realize this aim manufacturers and contractors cooperate with each other in performing high quality maintenance through plant lifetime maintenance system. TQC (Total Quality Control) activity enhances the motivation for each individual to have a quality-oriented mind and cultivate the safety culture. Under the lifetime employment practice, Kansai EPC and maintenance contractors can conduct systematic education and training, and the Maintenance Training Center helps to make it effective. 6 figs

  7. Budesonide/formoterol maintenance plus reliever therapy

    DEFF Research Database (Denmark)

    Bisgaard, Hans; Le Roux, Pascal; Bjåmer, Ditlef

    2006-01-01

    on ICS investigated whether a novel regimen using budesonide/formoterol for maintenance and reliever therapy (Symbicort maintenance and relief therapy [SMART]) [Symbicort; AstraZeneca R&D, Lund, Sweden] could reduce exacerbations. METHODS: Patients received SMART (budesonide/formoterol 80/4.5 microg qd...... maintenance plus additional inhalations for symptom relief), budesonide/formoterol 80/4.5 microg qd for maintenance (fixed combination), or higher-dose budesonide 320 microg qd (fixed-dose budesonide). Blinded as-needed medication (terbutaline 0.4 microg) was provided in both fixed-dose groups. RESULTS: SMART...... prolonged the time to first exacerbation vs fixed-dose budesonide (p = 0.02) and fixed-dose combination (p SMART vs fixed-dose budesonide and fixed-dose combination (0.08/patient vs 0.28/patient and 0.40/patient...

  8. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  9. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  10. Development and application of computerized maintenance management system at a nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Oh, Yon Woo; Kim, S. D.; Jang, K. D.; Kim, Y. G.

    2001-12-01

    In order to accomplish the purpose of research, it is the most important for the equipment to work well. The computerized maintenance management system proven by the case-studies can have an effect on the research and it can be one of the most major elements to assist the research at the research laboratory. To prevent the breakdown of the equipment at the research facility which can hinder the improvement of the research work, it is essential to maintain the equipment of facility without the sudden breakdown and to short the recovery time. If these elements such as the causes of the breakdown were well-managed and suvervised with care, this recovery time could be minimized. The aims of this research, therefore, are to introduce the development of the computerized maintenance management system and to apply it at the field in order to minimize the breakdown of the equipment and the recovery time and in order to perform the equipment maintenance service with the minimized expense and maximize the service efficiency through the planned management of the budget, the manpower and the service

  11. An approach to maintenance optimization where safety issues are important

    International Nuclear Information System (INIS)

    Vatn, Jorn; Aven, Terje

    2010-01-01

    The starting point for this paper is a traditional approach to maintenance optimization where an object function is used for optimizing maintenance intervals. The object function reflects maintenance cost, cost of loss of production/services, as well as safety costs, and is based on a classical cost-benefit analysis approach where a value of prevented fatality (VPF) is used to weight the importance of safety. However, the rationale for such an approach could be questioned. What is the meaning of such a VPF figure, and is it sufficient to reflect the importance of safety by calculating the expected fatality loss VPF and potential loss of lives (PLL) as being done in the cost-benefit analyses? Should the VPF be the same number for all type of accidents, or should it be increased in case of multiple fatality accidents to reflect gross accident aversion? In this paper, these issues are discussed. We conclude that we have to see beyond the expected values in situations with high safety impacts. A framework is presented which opens up for a broader decision basis, covering considerations on the potential for gross accidents, the type of uncertainties and lack of knowledge of important risk influencing factors. Decisions with a high safety impact are moved from the maintenance department to the 'Safety Board' for a broader discussion. In this way, we avoid that the object function is used in a mechanical way to optimize the maintenance and important safety-related decisions are made implicit and outside the normal arena for safety decisions, e.g. outside the traditional 'Safety Board'. A case study from the Norwegian railways is used to illustrate the discussions.

  12. An approach to maintenance optimization where safety issues are important

    Energy Technology Data Exchange (ETDEWEB)

    Vatn, Jorn, E-mail: jorn.vatn@ntnu.n [NTNU, Production and Quality Engineering, 7491 Trondheim (Norway); Aven, Terje [University of Stavanger (Norway)

    2010-01-15

    The starting point for this paper is a traditional approach to maintenance optimization where an object function is used for optimizing maintenance intervals. The object function reflects maintenance cost, cost of loss of production/services, as well as safety costs, and is based on a classical cost-benefit analysis approach where a value of prevented fatality (VPF) is used to weight the importance of safety. However, the rationale for such an approach could be questioned. What is the meaning of such a VPF figure, and is it sufficient to reflect the importance of safety by calculating the expected fatality loss VPF and potential loss of lives (PLL) as being done in the cost-benefit analyses? Should the VPF be the same number for all type of accidents, or should it be increased in case of multiple fatality accidents to reflect gross accident aversion? In this paper, these issues are discussed. We conclude that we have to see beyond the expected values in situations with high safety impacts. A framework is presented which opens up for a broader decision basis, covering considerations on the potential for gross accidents, the type of uncertainties and lack of knowledge of important risk influencing factors. Decisions with a high safety impact are moved from the maintenance department to the 'Safety Board' for a broader discussion. In this way, we avoid that the object function is used in a mechanical way to optimize the maintenance and important safety-related decisions are made implicit and outside the normal arena for safety decisions, e.g. outside the traditional 'Safety Board'. A case study from the Norwegian railways is used to illustrate the discussions.

  13. Maintenance cost optimization in condition based maintenance: a case study for critical facilities

    OpenAIRE

    Filippo De Carlo; Maria Antonietta Arleo

    2013-01-01

    The increasing availability required to industrial plants and the limited budget often existing to assure it, require a careful formulation of maintenance optimization models. This need is primary for process plants, for which minimization of stops and maximization of their availability, are essential for ensuring targeted production and, therefore, profitability. In this context, the choice of the maintenance strategy is hence fundamental, depending on the system features and then on the eff...

  14. The maintenance management for lean organization

    OpenAIRE

    Daniel D. GEORGESCU

    2010-01-01

    The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM) system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvemen...

  15. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  16. An effective manpower planning approach for maintenance ...

    African Journals Online (AJOL)

    The level of maintenance activities of a cocoa processing factory in Nigeria was studied. Data on critical machine parts involved in the maintenance work were collected and the different jobs carried out according to sections and nature of the activities were classified. The workloads for each type of maintenance activities ...

  17. Maintenance Planning for Historic Buildings

    Directory of Open Access Journals (Sweden)

    Diana Plian

    2008-01-01

    Full Text Available The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  18. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  19. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  20. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  1. Removing well bore liquid blockage by gas injection

    International Nuclear Information System (INIS)

    Ahmed, Tarek

    2000-01-01

    Gas condensate reservoirs have long presented production problems when the pressure around the well bore drops below the dew point pressure. The formation of the condensate around the well bore can be thought of as an additional 'skin' that causes a reduction in the gas flow rates. Many processes have been used successfully to prevent or reduce the formation of liquids within the entire reservoir, such as pressure maintenance schemes and gas cycling processes. The pressure maintenance scheme is designed to keep the reservoir pressure at or above the dew point pressure while the gas cycling process is intended to reduce the liquid dropout by vaporization.Often times the pressure in the near-well bore region of the reservoir falls below the dew point pressure, while the pressure in the reservoir remains higher than the dew point pressure. As the near-well bore pressure drops below the dew point pressure, retrograde condensation occurs leading to the formation and then the mobilization of the condensate phase towards the producing wells. The liquid phase accumulates in the near Well bore region, forming a ring, which progressively reduces the gas deliverability. This study is designed to provide an insight into the mechanism of gas injection process in reducing gas-well productivity losses due to condensate blocking in the near well bore region. The study also evaluates the effectiveness of lean gas, N 2 , and CO 2 Huff 'n' Puff injection technique in removing the liquid dropout accumulation in and around the well bore. Results of the study show the importance of selecting the optimum injection volume and pressure. (author)

  2. Pavement maintenance procedures with and without milling materials

    Directory of Open Access Journals (Sweden)

    Rafiqul A. Tarefder

    2016-01-01

    Full Text Available This study evaluates maintenance treatment followed by different Districts of New Mexico Department of Transportation (NMDOT. In addition, two case studies on the use of old pavement materials, called the “millings”, in maintenance projects are reported. Based on this study, it is observed that none of the Districts have a written procedure for maintenance work. Rather Districts rely on the experience of the maintenance crew for conducting maintenance projects. All Districts prefer to use chip seal for maintenance irrespective of distress conditions of the pavements. Patching and crack sealing are usually done before chip sealing to extend the life of the chip seals. Sand seal, scrub seal, and slurry seal projects are not done by District maintenance crews but by outside contractors. It is also observed that all Districts are interested in using millings in maintenance projects and most have already used millings in at least one maintenance project with some success and failure. Most of the Districts have used coarse fraction of millings in chip seal projects successfully. However, they failed to find a proper way to process the fine fractions of millings. Case Study I shows that fine millings can be used to construct thin overlay when mixed with emulsion in pug mill or hot drums. Case Study II concludes that fine millings can be used as fine/sand seal successfully following the same procedure and using the same equipment as chip seal. Keywords: Millings, Maintenance, Emulsion, Rutting, Pug-mill

  3. Task oriented evaluation system for maintenance robots

    International Nuclear Information System (INIS)

    Asame, Hajime; Endo, Isao; Kotosaka, Shin-ya; Takata, Shozo; Hiraoka, Hiroyuki; Kohda, Takehisa; Matsumoto, Akihiro; Yamagishi, Kiichiro.

    1994-01-01

    The adaptability evaluation of maintenance robots to autonomous plants has been discussed. In this paper, a new concept of autonomous plant with maintenance robots are introduced, and a framework of autonomous maintenance system is proposed. Then, task-oriented evaluation of robot arms is discussed for evaluating their adaptability to maintenance tasks, and a new criterion called operability is proposed for adaptability evaluation. The task-oriented evaluation system is implemented and applied to structural design of robot arms. Using genetic algorithm, an optimal structure adaptable to a pump disassembly task is obtained. (author)

  4. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  5. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  6. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  7. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    STORAGESEVER

    2009-04-20

    Apr 20, 2009 ... Key words: Maintenance, preventive maintenance, enterprise, planning. INTRODUCTION .... There is machine introduction form on each machine. Moreover, ..... loy using total productive maintenance (TPM) approach. M.Sc.

  8. Radiation incident in oil well logging

    International Nuclear Information System (INIS)

    Lozada, J.A.

    1998-01-01

    On June 4th 1997 equipment failure and violation of approved procedures by a crew of workers initiated a series of events that resulted in the unnecessary exposure to neutron and gamma radiation, from a 666 GBq Am 241 Be source, of forty two workers from a well logging company in Venezuela. Due to the presence of dry mud or drilling fluids inside the logging tool, the nosepiece was screwed off the rest of the source holder; this piece was mistaken for the entire source holder thus leaving the source inside the tool. The tool was labelled for maintenance and electronic laboratory personal worked near the source for seven hours before they identify its presence. As soon as the incident was detected a contingency plan was implemented and the source could be retrieved from the tool and placed in its shipping container. The TLD badges indicate doses well below the annual limit of 20 mSv, and none of the workers involved in the incident seem to show serious health consequences from it. After the incident, in order to avoid the occurrence of similar situations, a better source and tool maintenance program was implemented, all the workers were re-trained, and area monitors were installed in all operations bases. (author)

  9. Westinghouse integrated protection system. An overview of the software design and maintenance features

    International Nuclear Information System (INIS)

    Gibson, R.J.

    1995-01-01

    The Westinghouse Integrated Protection System was designed with the goal of providing a system which can be easily verified, validated, and maintained. The software design and structure promote the ease of translation from functional requirements to applications function software while also improving the ability to verify and maintain the applications function software. The use of independent, reusable, common functions software modules focuses the design, verification, and validation of the software and reduces the likelihood of errors occurring during the application and maintenance of the software. The simple continuous loop method of operation used throughout the IPS provides a standard deterministic method of operation. The IPS design also incorporates the use of embedded self-diagnostics to perform continuous hardware oriented tests of the system and the use of an independent subsystem to automatically perform a functional test of the system. Maintenance interfaces also exist to readily identify and locate faults as well as providing other maintenance capabilities. These testing and maintenance features enhance the overall reliability and availability of the system. (orig.) (2 refs., 2 figs.)

  10. Perpetual pavement – absorbing stress and functional maintenance

    Directory of Open Access Journals (Sweden)

    Rong Gao

    2017-03-01

    Full Text Available Perpetual Pavement combines the well documented smoothness and safety advantages of asphalt with an advanced, multi-layer paving design process, that with routine maintenance, extends the useful life of a roadway. Perpetual provides long lasting road and smoothness for the construction purposes. This study has the design key points of perpetual pavement based on the idea of life cycle, which has a new direction for the new highway construction, reconstruction and expansion. First, the structure of long life pavement design is studied to analyze the effect of stress absorbing layer. Second, researches on stress absorbing layer from the aspects of raw materials, mix proportion are implemented. Third, the design index of stress absorbing layer is determined by the shear strength test. The results show that the design idea of composite perpetual pavement can be realized by reasonable design of the stress absorbing layer and carrying out the surface functional maintenance can ensure the pavement to avoid structural damage in the operation stage.

  11. Assessment of building maintenance in Nigerian university system ...

    African Journals Online (AJOL)

    Building maintenance involves preserving a building so that it can retain its economic value ... maintenance policy by employing outsourcing maintenance services. ... services including the use of information and communication technology.

  12. On line system monitoring and analysis for efficient maintenance management [Paper No.: I-10

    International Nuclear Information System (INIS)

    Verma, R.M.P.

    1981-01-01

    Continuously operating chemical plants and nuclear reactors with huge investments cannot afford unscheduled shut down, costly down time, undesired exposure of people to radiation and high cost of inventory. To obtain cost effectiveness in terms of increased plant availability with increased quality, safety and reliability of plant operations a good maintenance system is required. A preventive maintenance programme, though successful to a greater extent, has got the limitations of being based upon elapsed time, subjective approach or statistical data. Hence, maintenance action is mistimed. Preventive maintenance can become very effective if rational and scientific data on equipment under working conditions are available. It can be achieved through on-line predictive instruments like sound level and vibration analyzers, probologs, corrosmeters, strain gages, thermographic infrared sensors, on-line ferrographs, chromatographs, acoustic emission, eddy current ultrasonic and wireless sensors etc. Instruments help maintenance engineer to diagnose, inspect, monitor, and help in forecasting failures and scheduling the frequencies optimally for overhauls, replacements, lubrication etc. They are also helpful in establishing work load, manpower, resource planning and inventory control. This paper discusses real time computer based system as well as conventional instruments and techniques. (author)

  13. The Savannah River Site's Groundwater Monitoring Program 1991 well installation report

    International Nuclear Information System (INIS)

    1992-06-01

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1991. It includes discussion of environmental soil borings, surveying, well installations, abandonments, maintenance, and stabilization

  14. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email. Telecom Section - IT/CS

  15. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  16. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  17. The role of the restructured Mobile Remote Service Base System (MBS) in support of Space Station maintenance and servicing

    Science.gov (United States)

    Darlington, T.; Krukewich, K.

    1992-08-01

    The critical parameters resulting from the restructuring of Space Station Freedom which necessitated the redesign of the Mobile Remote Service Base System (MBS) are described. These include optimization of robotic attachment locations for access to the Space Station truss-mounted orbital replacement units, transport of logistics carriers to the maintenance sites, minimization of EVA overhead associated with maintenance, self-maintenance of other mobile servicing system (MSS) elements on the MBS, and balancing of station EVA and extravehicular robotics in a complementary fashion to minimize maintenance overhead in general. Consideration is given to the configuration of the resulting MBS, which provides the program with maximum flexibility to utilize the assets of the MSS and optimizes end-to-end maintenance with regard to the use of station resources such as crew time and power. Maintenance and servicing scenarios which are instrumental to the reconfigured MBS as well as the results of improved maintenance capability are presented.

  18. Human-Technology Centric In Cyber Security Maintenance For Digital Transformation Era

    Science.gov (United States)

    Ali, Firkhan Ali Bin Hamid; Zalisham Jali, Mohd, Dr

    2018-05-01

    The development of the digital transformation in the organizations has become more expanding in these present and future years. This is because of the active demand to use the ICT services among all the organizations whether in the government agencies or private sectors. While digital transformation has led manufacturers to incorporate sensors and software analytics into their offerings, the same innovation has also brought pressure to offer clients more accommodating appliance deployment options. So, their needs a well plan to implement the cyber infrastructures and equipment. The cyber security play important role to ensure that the ICT components or infrastructures execute well along the organization’s business successful. This paper will present a study of security management models to guideline the security maintenance on existing cyber infrastructures. In order to perform security model for the currently existing cyber infrastructures, combination of the some security workforces and security process of extracting the security maintenance in cyber infrastructures. In the assessment, the focused on the cyber security maintenance within security models in cyber infrastructures and presented a way for the theoretical and practical analysis based on the selected security management models. Then, the proposed model does evaluation for the analysis which can be used to obtain insights into the configuration and to specify desired and undesired configurations. The implemented cyber security maintenance within security management model in a prototype and evaluated it for practical and theoretical scenarios. Furthermore, a framework model is presented which allows the evaluation of configuration changes in the agile and dynamic cyber infrastructure environments with regard to properties like vulnerabilities or expected availability. In case of a security perspective, this evaluation can be used to monitor the security levels of the configuration over its lifetime and

  19. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  20. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  1. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  2. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  3. Risk based maintenance: Resource requirements and organizational challenges

    International Nuclear Information System (INIS)

    Weerakkody, S.D.

    2000-01-01

    10CFR50.65 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants' required licensees to monitor the performance or condition of structures, systems, or components (SSCs) against licensee established goals, in a manner sufficient to provide reasonable assurance that such SSCs are capable of fulfilling their intended functions. The goals were required to be commensurate with safety significance and operating experience. Northeast Utilities relied upon PRAs to implement 10CFR50.65, which is also referred to as the 'Maintenance Rule'. The Maintenance Rule changed some aspects of maintenance of structures, systems, and components (SSC) at nuclear power plants. One objective of the rule was to focus the maintenance resources based on risk significance of components. This paper will discuss the organizational challenges and resource requirements associated with implementation of the Maintenance Rule at nuclear facilities that are supported by the Northeast Utilities Services Company (NUSCo). The paper will discuss (a) how these challenges were addressed, (b) the resources required for ongoing efforts to support the Maintenance Rule, and (c) several key safety benefits derived from the implementation of the Maintenance Rule. (author)

  4. Critical Design Factors for Sector Transport Maintenance in DEMO

    Energy Technology Data Exchange (ETDEWEB)

    Utoh, H.; Someya, Y.; Tobita, K.; Asakura, N.; Hoshino, K.; Nakamura, M., E-mail: uto.hiroyasu@jaea.go.jp [Japan Atomic Energy Agency, Rokkasho (Japan)

    2012-09-15

    Full text: Maintenance is a critical issue for fusion DEMO reactor because the design conditions and requirements of DEMO maintenance scheme are different from that of ITER remote handling. The sector transport maintenance scheme has advantages to maintain blankets and divertors without the use of sophisticated remote handling devices including sensitive devices to radiation in the reactor. SlimCS designed in JAEA adopts the sector transport maintenance scheme in which every sector is pulled out horizontally through a port between TF coils. A critical design issue for the horizontal sector transport maintenance scheme is how to support an enormous turnover force of the toroidal field (TF) coils. We propose following two options; first option is the horizontal transport maintenance scheme in which every sector is pulled out through four horizontal ports connected with the corridor. Second option is the vertical sector transport maintenance scheme with small vertical maintenance ports (total: 6 ports). The new horizontal sector transport limited in the number of maintenance ports is a more realistic maintenance scheme, and the key engineering issue is the transferring mechanism of sector in the vacuum vessel. In the maintenance scenario, the key design factors are the cool down time in reactor and the cooling method in maintenance scheme for keeping components under operation temperature. By one-dimensional heat conduction analysis, the sector should be transported to hot cell within 40 hours in the case the cool down time is one month. In the horizontal sector transport maintenance, the maintenance time including removal of cooling piping, drain of cooling water and sector transport to hot cell is about 32 hours. Furthermore, the tritium release in the sector transport can be suppressed because the components temperature drops by forced-air cooling system. This paper mainly focuses on a sector transport maintenance scheme from the aspects of high plant availability

  5. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  6. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  7. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  8. Proving maintenance practices at France's CETIC facility

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    CETIC, a PWR maintenance testing, training and validation centre became operational in September 1986. It is designed to meet the following basic requirements: development of plant maintenance processes to reduce work time, validation of tools for use during maintenance, training and qualification of teams for performing high-technology, high-risk operations in nuclear power plants. (U.K.)

  9. Strategies for the Management of Built Heritage Linked to Maintenance and Monitoring. Case Study of the San Roque Neighborhood, Cuenca, Ecuador

    Science.gov (United States)

    Achig-Balarezo, M. C.; Vázquez, L.; Barsallo, M. G.; Briones, J. C.; Amaya, J.

    2017-10-01

    The rehabilitation of heritage sites, as well as the implementation of monitoring and control strategies is fundamental for its conservation. In the case of Cuenca, a World Heritage City, a maintenance campaign in the traditional neighborhood of San Roque was carried out in 2014. The objective was to undertake maintenance actions on roofs and façades as well as on elements at risk. The campaign process was developed keeping in mind the cycle or phases of preventive conservation: anamnesis, diagnosis, therapy and control (ICOMOS, 2003). At the end of the maintenance campaign an impact assessment was undertaken and monitoring tools were handed out to the community in order to strengthen the citizen participation in the preservation of built heritage. The experience of the maintenance campaign unveiled a series of lessons that have been evaluated in the present investigation, being the main objective the strengthening of the processes of governance and documentation through the formulation of strategies inherent to the maintenance of heritage buildings. In this process it is shown that the participation of citizens is a strategic factor for the sustainable development of maintenance campaigns, which allow for the preservation of historical sites for future generations.

  10. The MERC maintenance system

    International Nuclear Information System (INIS)

    Izquierdo, J.J.; Chauvire, P.; Plessis, L.

    1991-01-01

    Maintenance in the modern commercial reprocessing plants is a subject of the highest priority in order to guarantee availability for the whole life of the plant. The design concept of the UP3 reprocessing plant at La Hague identified several categories of equipment according to their maintenance design principles. Among them, Standard Process Equipment such as pumps, valves, ejectors and filters which need periodic maintenance. These equipment items are designed in removable modular form to avoid the need to disconnect piping. Removal is performed under shielding and without breach of containment through the use of a transfer cask that is connected to the cell containing the equipment to be removed. This transfer cask is called MERC (Mobile Equipment Replacement Cask). Containment is preserved by an air-tight system consisting of coupled doors, with a special connecting gasket. This system can remove and replace failed equipment, without spreading contamination to work areas. (author)

  11. Tele-maintenance 'intelligent' system for technical plants result management

    International Nuclear Information System (INIS)

    Concetti, Massimo; Cuccioletta, Roberto; Fedele, Lorenzo; Mercuri, Giampiero

    2009-01-01

    The management of technical plant for productivity and safety is generally a complex activity, particularly when many plants distributed in the territory are considered (i.e. the more and more frequent case of outsourced plants maintenance by specialized companies), granted quality and cost results are required (i.e. the case of some rather innovative contract solutions) and the technology involved is heterogeneous and innovative (i.e. electro-mechanical plants). In order to efficiently achieve the above aims an 'intelligent' maintenance-management system for the distant monitoring and controlling by a remote control center has been developed. The so-called GrAMS (granted availability management system) system is conceived to give to organizations involved in technical-industrial plants management the possibility to tend to a 'well-known availability' and 'zero-failures' management. In particular, this study deals with the diagnostic aspects and safety level of technical plants (such as elevators, thermo-technical plants, etc.), and with the involvement of ad hoc designed software analysis tools based on neural networks and reliability indicators. Part of the research dealing with the tele-maintenance intelligent system has been financed by the Italian High Institute for Safety (ISPESL) and led to the development of a pre-industrial prototype whose realization and testing is here described

  12. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be contactable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email to standard.telephone@cern.ch. Telecom Section IT/CS

  13. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    Rennich, M.J.; Nelson, B.E.

    1994-01-01

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  14. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  15. Flexible Software Solution for Information System of Maintenance and Repair in Armenian NPP Medzamor

    International Nuclear Information System (INIS)

    Stoilova Yordanova, V.; Manchev, B.

    2016-01-01

    Achieving high performance in maintenance and repair activities in nuclear facilities and good results in this area is not possible without proper planning. This includes long-term, medium-term and annual planning. A computerized information maintenance management system is a tool widely used by nuclear operators to achieve safe, reliable, stable and predictable plant operation. Development and implementation of such a system in the Armenian NPP Medzamor (ANPP) was initiated by the European Commission (EC) in August 2013 based on the decision of ANPP management to improve practice in terms of planning and carrying out maintenance and repair of plant structures, systems and components (SSCs). The main purpose for the development and deployment of information maintenance management system in ANPP is creation of a systematic approach to the distribution of tasks between the maintenance personnel as well as the timing and methods of their implementation - on which systems, structures and components, maintenance frequency, while the ultimate goal is to optimize the use of resources for maintenance and to ensure plant safe operation and reliability. In November 2013 a contract between European Commission and consortium Risk Engineering -David Holding was signed, including the following supplies: Hardware for the information system of ANPP (called us Archimed MRO); Specification, design and development of the software of Archimed MRO, installation of the system, data migration, training of ANPP staff operating the system, and 9 months trial operation. In the process of specifying the functionality of the system the main purpose was to provide modern information tools to help improve the work of ANPP personnel in the following areas: Optimization of ANPP maintenance program; Planning of maintenance, repair and overhaul (MRO) activities; Effective management of the processes of MRO; Analysis of the MRO results (trend analysis, recurrence of repairs, quality of the repairs

  16. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  17. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  18. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  19. Remote maintenance system for nuclear facilities

    International Nuclear Information System (INIS)

    Maeda, Masafumi

    1993-01-01

    In the facilities related to atomic energy, from the viewpoint of the reduction of radiation exposure of workers and the heightening of the rate of operation of the facilities, the development of remote maintenance system is regarded as important. Meidensha Electric Manufacturing Co., Ltd. developed the bilateral control type manipulator, BILARM-83, in 1979, and has developed high performance manipulator systems. As the design of the plant that realizes the remote operation maintenance of process machinery and equipment during plant operation, the remote maintenance system by canyon cell techniques, which was adopted in Savannah River plant, USA, and has been operated for nearly 50 years, has been known. The concept of the full remote maintenance system by large scale cell techniques was shown and has been developed by Power Reactor and Nuclear Fuel Development Corp. In order to realize the remote maintenance of such large scale cells, Meidensha is developing the both arm type bilateral servo manipulator, the single arm type power manipulator, the transport system for moving them, the power and signal system and so on. Those systems were adopted for the glass solidification facilities. (K.I.)

  20. Aircraft Maintenance Engineering: Factors Impacting Airlines E-Maintenance Technologies, Authoring and Illustrations

    Science.gov (United States)

    Karayianes, Frank

    The purpose of this research was to evaluate factors influencing acceptance and use of technologies in the field of aircraft maintenance authoring, graphics, and documentation. Maintenance engineering authors convert complex engineering used in aircraft production and transform that data using technology (tools) into usable technical publications data. While the current literature includes a large volume of research in technology acceptance in various domains of industry and business, the problem is that no such studies exist with respect to the aircraft maintenance engineering authoring, allowing any number of tools to be used and acceptance to be unsure. The study was based on theoretical approaches of the Technology Acceptance Model and the associated hypothesis related to eight research questions. A survey questionnaire was developed for data collection from a selected population of aircraft maintenance engineering authors. Data collected from 148 responses were exposed to a range of statistical methods and analyses. Analysis of data were performed within the structural equation model using exploratory factor analysis, confirmatory factor analysis, and a range of regression methods. The analyses generally provided results consistent with prior literature. Two survey questions yielded unexpected results contrary to similar studies. The relationship between prior experience and job level did not show a significant relationship with perceived usefulness or perceived ease of use. Other results included the significant relationship between Perceived Usefulness and Perceived Ease of Use with Technology acceptance. Recommendations include understanding how Technology Acceptance can be improved for the industry and the need for further research not covered to refine recommendations for technology acceptance related to the aviation industry.