WorldWideScience

Sample records for watts average supplier

  1. Green Suppliers Performance Evaluation in Belt and Road Using Fuzzy Weighted Average with Social Media Information

    Directory of Open Access Journals (Sweden)

    Kuo-Ping Lin

    2017-12-01

    Full Text Available A decision model for selecting a suitable supplier is a key to reducing the environmental impact in green supply chain management for high-tech companies. Traditional fuzzy weight average (FWA adopts linguistic variable to determine weight by experts. However, the weights of FWA have not considered the public voice, meaning the viewpoints of consumers in green supply chain management. This paper focuses on developing a novel decision model for green supplier selection in the One Belt and One Road (OBOR initiative through a fuzzy weighted average approach with social media. The proposed decision model uses the membership grade of the criteria and sub-criteria and its relative weights, which consider the volume of social media, to establish an analysis matrix of green supplier selection. Then, the proposed fuzzy weighted average approach is considered as an aggregating tool to calculate a synthetic score for each green supplier in the Belt and Road initiative. The final score of the green supplier is ordered by a non-fuzzy performance value ranking method to help the consumer make a decision. A case of green supplier selection in the light-emitting diode (LED industry is used to demonstrate the proposed decision model. The findings demonstrate (1 the consumer’s main concerns are the “Quality” and “Green products” in LED industry, hence, the ranking of suitable supplier in FWA with social media information model obtained the difference result with tradition FWA; (2 OBOR in the LED industry is not fervently discussed in searches of Google and Twitter; and (3 the FWA with social media information could objectively analyze the green supplier selection because the novel model considers the viewpoints of the consumer.

  2. Healthy versus Unhealthy Suppliers in Food Desert Neighborhoods: A Network Analysis of Corner Stores’ Food Supplier Networks

    Directory of Open Access Journals (Sweden)

    Yeeli Mui

    2015-11-01

    Full Text Available Background: Products in corner stores may be affected by the network of suppliers from which storeowners procure food and beverages. To date, this supplier network has not been well characterized. Methods: Using network analysis, we examined the connections between corner stores (n = 24 in food deserts of Baltimore City (MD, USA and their food/beverage suppliers (n = 42, to determine how different store and supplier characteristics correlated. Results: Food and beverage suppliers fell into two categories: Those providing primarily healthy foods/beverages (n = 15 in the healthy supplier network (HSN and those providing primarily unhealthy food/beverages (n = 41 in the unhealthy supplier network (UHSN. Corner store connections to suppliers in the UHSN were nearly two times greater (t = 5.23, p < 0.001, and key suppliers in the UHSN core were more diverse, compared to the HSN. The UHSN was significantly more cohesive and densely connected, with corner stores sharing a greater number of the same unhealthy suppliers, compared to HSN, which was less cohesive and sparsely connected (t = 5.82; p < 0.001. Compared to African Americans, Asian and Hispanic corner storeowners had on average −1.53 (p < 0.001 fewer connections to suppliers in the HSN (p < 0.001. Conclusions: Our findings indicate clear differences between corner stores’ HSN and UHSN. Addressing ethnic/cultural differences of storeowners may also be important to consider.

  3. Watt and joule balances

    Science.gov (United States)

    Robinson, Ian A.

    2014-04-01

    The time is fast approaching when the SI unit of mass will cease to be based on a single material artefact and will instead be based upon the defined value of a fundamental constant—the Planck constant—h . This change requires that techniques exist both to determine the appropriate value to be assigned to the constant, and to measure mass in terms of the redefined unit. It is important to ensure that these techniques are accurate and reliable to allow full advantage to be taken of the stability and universality provided by the new definition and to guarantee the continuity of the world's mass measurements, which can affect the measurement of many other quantities such as energy and force. Up to now, efforts to provide the basis for such a redefinition of the kilogram were mainly concerned with resolving the discrepancies between individual implementations of the two principal techniques: the x-ray crystal density (XRCD) method [1] and the watt and joule balance methods which are the subject of this special issue. The first three papers report results from the NRC and NIST watt balance groups and the NIM joule balance group. The result from the NRC (formerly the NPL Mk II) watt balance is the first to be reported with a relative standard uncertainty below 2 × 10-8 and the NIST result has a relative standard uncertainty below 5 × 10-8. Both results are shown in figure 1 along with some previous results; the result from the NIM group is not shown on the plot but has a relative uncertainty of 8.9 × 10-6 and is consistent with all the results shown. The Consultative Committee for Mass and Related Quantities (CCM) in its meeting in 2013 produced a resolution [2] which set out the requirements for the number, type and quality of results intended to support the redefinition of the kilogram and required that there should be agreement between them. These results from NRC, NIST and the IAC may be considered to meet these requirements and are likely to be widely debated

  4. Supplier selection for strategic supplier development

    OpenAIRE

    Calvi , R.; Le Dain , Marie-Anne; Fendt , T.C.; Herrmann , C.J.

    2010-01-01

    Cahier de recherche n° 2010-11 E4; This article describes the application of the analytic hierarchy process (AHP) to the supplier selection decision for the strategic development of lean suppliers at a large German industrial company. In a literature survey and from explorative interviews, relevant criteria including supplier improvement potential through buyer involvement, strategic factors of the supplier development program as well as project success factors in supplier development were el...

  5. A compact broadband high efficient X-band 9-watt PHEMT MMIC high-power amplifier for phased array radar applications

    NARCIS (Netherlands)

    Hek, A.P. de; Hunneman, P.A.H.; Demmler, M.; Hulsmann, A.

    1999-01-01

    ln this paper the development and measurement results of a compact broadband 9-Watt high efficient X-band high-power amplifier are discussed. The described amplifier has the following state-of-the art performance: an average ouput power of 9 Watt, a gain of 20 dB and an average Power Added

  6. Multi-peta-watt laser performances

    International Nuclear Information System (INIS)

    Reichart, A.; Blanchot, N.; Nicolaizeau, M.; Ribeyre, X.; Bettinger, A.

    2000-01-01

    A multi-Peta-watt laser inside the 'Ligne d'integration laser' building is studied. We present simulations of the different amplification stages to reach broadband 10 kJ pulses in order to obtain a multi-Peta-watt laser beam. The results for preamplifier and power amplifier are detailed. Challenges of a multi-Peta-watt system are to increase the limit of compressed energy an order of magnitude, to perform a focal spot around 100 μm for Fast Ignitor applications, and to provide a temporal contrast better than 10 10 , for X-ray laser and plasma interaction applications. These first 1-D calculations are helpful for the design of a multi-Peta-watt laser. (authors)

  7. Dependence on Supplier, Supplier Trust and Green Supplier Integration: The Moderating Role of Contract Management Difficulty

    Directory of Open Access Journals (Sweden)

    Xuesong Zhao

    2018-05-01

    Full Text Available This study aims to investigate the impacts of dependence on supplier and supplier trust on green supplier integration, and the moderating role of contract management difficulty. In this study, we develop a dependence-trust-integration model based on resource dependence theory, social capital theory and transaction cost theory. We examine the hypothesized relationships using hierarchical regression analyses based on data collected from 187 Chinese firms. Our findings suggest that dependence on supplier has positive impacts on green supplier integration and supplier trust. Supplier trust partially mediates the relationship between dependence on supplier and green supplier integration. In addition, contract management difficulty negatively moderates the relationship between supplier trust and green supplier integration. This research contributes to the literature by offering empirical evidence concerning the indirect relationship between dependence on supplier and green supplier integration via supplier trust, and the trust-integration link depends on the level of contract management difficulty.

  8. Watt-Lite; Energy Statistics Made Tangible

    DEFF Research Database (Denmark)

    Jönsson, Li; Broms, Loove; Katzeff, Cecilia

    2011-01-01

    of consumers its consequences are poorly understood. In order to better understand how we can use design to increase awareness of electricity consumption in everyday life, we will discuss the design of Watt-Lite, a set of three oversized torches projecting real time energy statistics of a factory...... in the physical environments of its employees. The design of Watt-Lite is meant to explore ways of representing, understanding and interacting with electricity in industrial workspaces. We discuss three design inquiries and their implications for the design of Watt-Lite: the use of tangible statistics...

  9. Supplier Innovation

    DEFF Research Database (Denmark)

    Søberg, Peder Veng; Notman, Dorian Mark; Wæhrens, Brian Vejrum

    2017-01-01

    The prevailing research in supplier innovation has been conceptual or based on small data sets. The analysis of a large data set gives a clearer perspective on the actual type and degree of involvement of suppliers in the customer’s innovation process. The supplier perspective of the research...... counterbalances the customer bias that exists in the prevailing literature in this area. Similarly, the issue of the benefit of supplier involvement in the innovation/NPD process can be better understood. Manufacturing suppliers benefit financially from their involvement in the innovation/NPD process of their key...

  10. Analysis of AC and DC Lighting Systems with 150-Watt Peak Solar Panel in Denpasar Based on NASA Data

    Science.gov (United States)

    Narottama, A. A. N. M.; Amerta Yasa, K.; Suwardana, I. W.; Sapteka, A. A. N. G.; Priambodo, P. S.

    2018-01-01

    Solar energy on the Earth’s surface has different magnitudes on every longitude and latitude. National Aeronautics and Space Administration (NASA) provides surface meteorology and solar energy database which can be accessed openly online. This database delivers information about Monthly Averaged Insolation Incident On A Horizontal Surface, Monthly Averaged Insolation Incident On A Horizontal Surface At Indicated GMT Times and also data about Equivalent Number Of No-Sun Or Black Days for any latitude and longitude. Therefore, we investigate the lighting systems with 150-Watt peak solar panel in Denpasar City, the capital province of Bali. Based on NASA data, we analyse the received wattage by a unit of 150-Watt peak solar panel in Denpasar City and the sustainability of 150-Watt peak solar panel to supply energy for 432-Watt hour/day AC and 360-Watt hour/day DC lighting systems using 1.2 kWh battery. The result shows that the maximum received wattage by a unit of 150-Watt peak solar panel is 0.76 kW/day in October. We concluded that the 1.2 kWh installed battery has higher capacity than the battery capacity needed in March, the month with highest no-sun days, for both AC and DC lighting systems. We calculate that the installed battery can be used to store the sustainable energy from sun needed by AC and DC lighting system for about 2.78 days and 3.51 days, consecutively.

  11. Ingestion of radiocesium and strontium-90 by self-suppliers and non-self-suppliers in the first year following the Chernobyl reactor accident. Data taken as a basis for derivation of secondary intervention reference levels

    International Nuclear Information System (INIS)

    1988-01-01

    In Southeast Bavaria, the region of Germany with the highest Cs deposition, 20 self and non-self-suppliers were selected for observation of the ingestion and incorporation of radiocesium by means of check measurements of radioactivity in prepared diet duplicates and in the whole body. The results are comparatively analyzed. Surveys conducted in February/March 1987 show that both populations differ significantly in Cs incorporation. Children and adults among the self-suppliers revealed a Cs incorporation 3.5 times higher than that of the non-self-suppliers. An average Cs concentration of 8900 Bq was measured among the adult self-suppliers. By comparison, the average Cs concentration among the adult non-self-suppliers was only 2310 Bq. In the same period, a supply rate of 110 Bq/d (45-216 Bq/d) was measured among the adult self-suppliers, and a supply rate of 17 Bq/d (10-27 Bq/d) among the adult non-self-suppliers. The amount of activity incorporated per day was 77 Bq/d (64-96 Bq/d) among the younger children of the self-suppliers, and 32 Bq/d (24-40 Bq/d) among the older children of the non-self-suppliers. The specific activity of strontium 90 in dairy, meat and vegetable products mainly from the self-sufficiency areas was also analyzed. The average concentration of the activity of strontium 90 in raw milk was 0.4 Bq/l in February/March 1987, and the average specific activity for the other food products was 0.25-3 Bq/kg. The average values for the ingestion of strontium 90 over all the food products lie approximately between 0.3-0.5 Bq per person and day, and are comparable with the value of 0.3 Bq in the period before the reactor accident in Chernobyl. Starting from these values, the relative contamination of food as well as the effective dose equivalent of both groups of suppliers for the first year after the reactor accident in Chernobyl was measured. (orig./MG) [de

  12. Reducing Leaking Electricity to 1 Watt

    Energy Technology Data Exchange (ETDEWEB)

    Meier, A.K.; Huber, Wolfgang; Rosen, Karen

    1998-08-01

    In this study we examine some specific opportunities toreduce standby losses in electronic appliances. A review of powerconsumption levels for the major components responsible for standbyfunctions indicates that nearly all standby functions can be performedwith a total appliance standby power consumption of one watt or less. Wetherefore propose that standby losses be limited to one watt perappliance, a significant reduction from current levels for manyappliances. This target could be achieved with little or no extra cost tomanufacturers and could save over $2 billion in annual U.S. energy costs.Globally, a one-watt plan would lead to a significant reduction in carbonemissions.

  13. Academic Library-Supplier Relationship: The Experience of Supplier ...

    African Journals Online (AJOL)

    The partnership between an academic library and book suppliers is crucial for the timely and correct delivery of materials for use by customers. This article describes the relationship that exists between the University of Botswana Library (UBL) and its book suppliers. The process of supplier selection and evaluation used by ...

  14. Alignment of the NPL Mark II watt balance

    International Nuclear Information System (INIS)

    Robinson, I A

    2012-01-01

    To reach uncertainties in the region of 1 part in 10 8 a moving-coil watt balance not only requires the accurate measurement of voltage, resistance, velocity, mass and the acceleration due to gravity but, in addition, requires the apparatus to be adjusted correctly to minimize the second order effects which can reduce the accuracy of the measurement. This paper collects together the alignment and correction techniques that have been developed at NPL over many years and are required to minimize the uncertainty of the measurement. Some of these techniques are applicable to all watt balances, whilst a few are specific to watt balances that employ a conventional beam balance to support a circular coil in a radial magnetic field, such as the NPL Mark II watt balance, now known as the NRC watt balance. (paper)

  15. NegaWatt University 2011. Proceedings

    International Nuclear Information System (INIS)

    2011-10-01

    The 2011 meeting of the NegaWatt association gathered about 150 participants during 2 days of conference devoted to the presentation of the NegaWatt energy scenario. This document brings together the available presentations: 1 - The residential and tertiary building sector in the NegaWatt 2011 energy scenario; 2 - Lessons learnt from the appraisal campaigns carried out in energy-efficient buildings: understanding the differences between forecasts and measurements (Olivier Sidler, Enertech); 3 - Agriculture sector: presentation of the Afterres 2050 scenario - Agriculture, forest and land use scenario (Christian Couturier, Elen Devauchelle, Sylvain Doublet, Solagro); 4 - Industry sector; 5 - Transportation sector, peoples mobility and freight transport; 6 - Development of renewable energy sources and power networks balancing; 7 - The phasing out of nuclear energy in a reasonable way; 8 - The post-Fukushima international perspectives of nuclear energy: nuclear decline and accelerated phasing in of intelligent systems (Mycle Schneider)

  16. The psychiatrist, the historian and The Christian Watt Papers.

    Science.gov (United States)

    Beveridge, Allan; Watson, Fiona

    2006-06-01

    The publication in the 1980s of The Christian Watt Papers brought to public attention the life of a previously unknown, long-term inmate of the Aberdeen Royal Asylum. Christian Watt's story inspired a play and a television documentary. This paper examines what the historical records reveal about Watt's life and how this compares with her own account.

  17. Improving Supplier Performance in New Product Development: The Role of Supplier Development

    OpenAIRE

    Potter, Antony; Lawson, Benn; Krause, Dan

    2015-01-01

    Suppliers play an increasingly central role in helping firms achieve their new product development (NPD) goals. Although much attention has focused on managing the buyer-supplier interface, we know little about how firms can enhance a supplier’s ability to contribute to an NPD effort. Thus, we propose a theoretical model that conceptualizes supplier development activities within inter-organizational NPD projects as bilateral knowledge-sharing processes. Antecedents (supplier responsibility,...

  18. Makahiki+WattDepot

    DEFF Research Database (Denmark)

    Johnson, Philip M.; Xu, Yongwen; Brewer, Robert S.

    2013-01-01

    to consumers. Since 2009, we have been designing, implementing, and evaluating an open source software "stack" to facilitate this research. This software stack consists of two custom systems called WattDepot and Makahiki, along with the open source components they rely upon (Java, Restlet, Postgres, Python...

  19. Emerging nuclear suppliers

    International Nuclear Information System (INIS)

    Sands, A.

    1990-01-01

    Efforts to prevent the spread of nuclear weapons have usually taken two tracks: The traditional approach has concentrated on a potential proliferant's perceived need for nuclear technology and possibly weapons; a second approach has targeted the supply side of the proliferation equation. The issue being examined in this book---emerging nuclear suppliers---falls between these two approaches. The potential proliferants have emerged as possible unrestrained suppliers of nuclear materials and technology. They threaten the entire nonproliferation regime by their exporting, not their weapons development. Analyzing and understanding the issue of emerging suppliers requires a refined definition of suppliers in general. The simple dichotomy of traditional versus emerging suppliers is no longer an adequate framework for analysis. Suppliers differ significantly in their technical capabilities, experience, and regime involvement, and these distinctions result in different nuclear export policies

  20. Automating Visualization Service Generation with the WATT Compiler

    Science.gov (United States)

    Bollig, E. F.; Lyness, M. D.; Erlebacher, G.; Yuen, D. A.

    2007-12-01

    As tasks and workflows become increasingly complex, software developers are devoting increasing attention to automation tools. Among many examples, the Automator tool from Apple collects components of a workflow into a single script, with very little effort on the part of the user. Tasks are most often described as a series of instructions. The granularity of the tasks dictates the tools to use. Compilers translate fine-grained instructions to assembler code, while scripting languages (ruby, perl) are used to describe a series of tasks at a higher level. Compilers can also be viewed as transformational tools: a cross-compiler can translate executable code written on one computer to assembler code understood on another, while transformational tools can translate from one high-level language to another. We are interested in creating visualization web services automatically, starting from stand-alone VTK (Visualization Toolkit) code written in Tcl. To this end, using the OCaml programming language, we have developed a compiler that translates Tcl into C++, including all the stubs, classes and methods to interface with gSOAP, a C++ implementation of the Soap 1.1/1.2 protocols. This compiler, referred to as the Web Automation and Translation Toolkit (WATT), is the first step towards automated creation of specialized visualization web services without input from the user. The WATT compiler seeks to automate all aspects of web service generation, including the transport layer, the division of labor and the details related to interface generation. The WATT compiler is part of ongoing efforts within the NSF funded VLab consortium [1] to facilitate and automate time-consuming tasks for the science related to understanding planetary materials. Through examples of services produced by WATT for the VLab portal, we will illustrate features, limitations and the improvements necessary to achieve the ultimate goal of complete and transparent automation in the generation of web

  1. Watt-Lite; Energy Statistics Made Tangible

    DEFF Research Database (Denmark)

    Jönsson, Li; Broms, Loove; Katzeff, Cecilia

    2011-01-01

    Increasing our knowledge of how design affects behaviour in the workplace has a large potential for reducing electricity consumption. This would be beneficial for the environment as well as for industry and society at large. In Western society energy use is hidden and for the great mass...... in the physical environments of its employees. The design of Watt-Lite is meant to explore ways of representing, understanding and interacting with electricity in industrial workspaces. We discuss three design inquiries and their implications for the design of Watt-Lite: the use of tangible statistics...

  2. Modern methods of evaluation existing suppliers and suppliers selected by customer for small and medium-sized companies

    Directory of Open Access Journals (Sweden)

    Marie Jurová

    2010-01-01

    Full Text Available On existing conditions on global market (almost identical quality, almost identical purchasing values companies have to definite the total rating of importance of evaluative criteria. In post-crisis period the problem of suppliers’ evaluation is one of the biggest, because companies had to use all resources and all possibilities to develop their own business. Many authors wrote about collaborative planning and warehousing as one of possibilities to optimization work inside supply chain. For this paper define small and medium-sized enterprises (SME as enterprises with the size of maximum 250 em­ployers. In literature was read we couldn’t find information about own system of suppliers evaluation for small and medium-sized enterprises. SME can have some different types of business and in this case need the universal system of eva­lua­tion. The research of this paper is oriented on small and medium-sized enterprises with different types of business. The new theoretical universal method of calculation for evaluation existing suppliers for small and medium-sized enterprises will present in this paper. This theoretical method is based on average values. This method includes traditional evaluative criteria (quality, delivery time and other (mobility of supplier, possibilities of new level of partnership. This method of evaluation can not be used for continual manufacture. New method can improve the total evaluation of supplier in small and medium-sized enterprises.

  3. Swisswoodhouse -a building for the 2000-Watt Society; Swisswoodhouse - ein Gebaeude fuer die 2000-Watt-Gesellschaft - Synthesebericht

    Energy Technology Data Exchange (ETDEWEB)

    Menz, T.; Wallbaum, H.; Hardziewski, R.; Graf, S.; Trachsel-Gerber, N.; Koschenz, M.; Guentert, P.

    2009-05-15

    This report deals with a building conceived to meet the requirements of the Swiss '2000-Watt Society' concept. The aims of the project are discussed which feature the demonstration of a forward-looking architectural layout, comfortable and healthy living, environmentally compatible and low resource consumption, standardisation and cost reduction. The report contains seven sections: Basics of the '2000-Watt Society' concept, optimisation of the whole building system, investor-orientated rating, use-oriented monitoring system, the development of the building, standardised building technology and, finally, a description of this pilot project.

  4. A Study on Watt-hour Meter Data Acquisition Method Based on RFID Technology

    Science.gov (United States)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; Chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-03-01

    Considering that traditional watt-hour meter data acquisition was subjected to the influence of distance and occlusion, a watt-hour meter data acquisition method based on RFID technology was proposed in this paper. In detail, RFID electronic tag was embedded in the watt-hour meter to identify the meter and record electric energy information, which made RFID based wireless data acquisition for watt-hour meter come true. Eventually, overall lifecycle management of watt-hour meter is realized.

  5. Benchmarking Supplier Development: An Empirical Case Study of Validating a Framework to Improve Buyer-Supplier Relationship

    Directory of Open Access Journals (Sweden)

    Shahzad Khuram

    2016-03-01

    Full Text Available In today’s dynamic business environment, firms are required to utilize efficiently and effectively all the useful resources to gain competitive advantage. Supplier development has evolved as an important strategic instrument to improve buyer supplier relationships. For that reason, this study focuses on providing the strategic significance of supplier development approaches to improve business relationships. By using qualitative research method, an integrated framework of supplier development and buyer-supplier relationship development has been tested and validated in a Finnish case company to provide empirical evidence. It particularly investigates how supplier development approaches can develop buyer-supplier relationships. The study present a set of propositions that identify significant supplier development approaches critical for the development of buyer-supplier relationships and develop a theoretical framework that specifies how these different supplier development approaches support in order to strengthen the relationships. The results are produced from an in-depth case study by implementing the proposed research framework. The findings reveal that supplier development strategies i.e., supplier incentives and direct involvements strongly effect in developing buyer-supplier relationships. Further research may focus on considering in-depth investigation of trust and communication factors along with propositions developed in the study to find out general applicability in dynamic business environment. Proposed integrated framework along with propositions is a unique combination of useful solutions for tactical and strategic management’s decision making and also valid for academic researchers to develop supplier development theories.

  6. Supplier relationship- specific investments and the role of safeguards for supplier innovation sharing

    NARCIS (Netherlands)

    Bode, C.; Wagner, S.M.

    2014-01-01

    The vast majority of the supplier innovation literature has focused on how buying firms can effectively “pull” innovations from their suppliers. Yet, we know remarkably little about the factors that contribute to a supplier voluntarily “pushing” innovations to its customers. The present study

  7. Green Supplier Selection Criteria

    DEFF Research Database (Denmark)

    Nielsen, Izabela Ewa; Banaeian, Narges; Golinska, Paulina

    2014-01-01

    Green supplier selection (GSS) criteria arise from an organization inclination to respond to any existing trends in environmental issues related to business management and processes, so GSS is integrating environmental thinking into conventional supplier selection. This research is designed...... to determine prevalent general and environmental supplier selection criteria and develop a framework which can help decision makers to determine and prioritize suitable green supplier selection criteria (general and environmental). In this research we considered several parameters (evaluation objectives......) to establish suitable criteria for GSS such as their production type, requirements, policy and objectives instead of applying common criteria. At first a comprehensive and deep review on prevalent and green supplier selection literatures performed. Then several evaluation objectives defined to assess the green...

  8. James Watt's Leicester Walk

    OpenAIRE

    Bell, Kathleen

    2016-01-01

    a poem in which James Watt, inventor of the separate condenser, walks through contemporary Leicester (his route is from Bonners Lane and alongside the canal, taking in the Statue of Liberty on its traffic island near Sage Road). It is derived from the exercise of taking a character for a walk,

  9. Buyer-supplier relationships and planning solutions

    NARCIS (Netherlands)

    Hvolby, H.H.; Trienekens, J.H.; Steger-Jensen, K.

    2007-01-01

    The paper focuses on supply chain relationships and segmented planning and ICT concepts. Major supplier segments are distinguished based on literature: capacity suppliers, standard suppliers, system suppliers and key suppliers. Next, current supply chain planning solutions are distinguished: vendor

  10. Thin Watts-Strogatz networks.

    Science.gov (United States)

    de Moura, Alessandro P S

    2006-01-01

    A modified version of the Watts-Strogatz (WS) network model is proposed, in which the number of shortcuts scales with the network size N as Nalpha, with alpha infinity, whereas in the original WS model, this ratio is constant. We call such networks "thin Watts-Strogatz networks." We show that even though the fraction of shortcuts becomes vanishingly small for large networks, they still cause a kind of small-world effect, in the sense that the length L of the network increases sublinearly with the size. We develop a mean-field theory for these networks, which predicts that the length scales as N1-alpha ln N for large N. We also study how a search using only local information works in thin WS networks. We find that the search performance is enhanced compared to the regular network, and we predict that the search time tau scales as N1-alpha/2. These theoretical results are tested using numerical simulations. We comment on the possible relevance of thin WS networks for the design of high-performance low-cost communication networks.

  11. Small Stirling dynamic isotope power system for multihundred-watt robotic missions

    International Nuclear Information System (INIS)

    Bents, D.J.

    1991-01-01

    Free Piston Stirling Engine (FPSE) and linear alternator (LA) technology is combined with radioisotope heat sources to produce a compact dynamic isotope power system (DIPS) suitable for multihundred watt space application which appears competitive with advance radioisotope thermoelectric generators (RTGs). The small Stirling DIPS is scalable to multihundred watt power levels or lower. The FPSE/LA is a high efficiency convertor in sizes ranging from tens of kilowatts down to only a few watts. At multihundred watt unit size, the FPSE can be directly integrated with the General Purpose Heat Source (GPHS) via radiative coupling; the resulting dynamic isotope power system has a size and weight that compares favorably with the advanced modular (Mod) RTG, but requires less than a third the amount of isotope fuel. Thus the FPSE extends the high efficiency advantage of dynamic systems into a power range never previously considered competitive for DIPS. This results in lower fuel cost and reduced radiological hazard per delivered electrical watt. 33 refs

  12. Supplier Resource Mobilization

    DEFF Research Database (Denmark)

    Ellegaard, Chris; Kragh, Hanne; Andersen, Poul Houman

    theoretical perspectives. This review, synthesis, and resultant discussion allow us to propose that future research should look closer at the resource activation process on the supplier side, the role of the buyer-supplier relationship in resource mobilization, and the approach of the buying company...

  13. ATLAS rewards two pixel detector suppliers

    CERN Multimedia

    2007-01-01

    Peter Jenni, ATLAS spokesperson, presented the ATLAS supplier award to Herbert Reichl, IZM director, and to Simonetta Di Gioia, from the SELEX company.Two of ATLAS’ suppliers were awarded prizes at a ceremony on Wednesday 13 June attended by representatives of the experiment’s management and of CERN. The prizes went to the Fraunhofer Institut für Zuverlässigkeit und Mikrointegration (IZM) in Berlin and the company SELEX Sistemi Integrati in Rome for the manufacture of modules for the ATLAS pixel detector. SELEX supplied 1500 of the modules for the tracker, while IZM produced a further 1300. The modules, each made up of 46080 channels, form the active part of the ATLAS pixel detector. IZM and SELEX received the awards for the excellent quality of their work: the average number of faulty channels per module was less than 2.10-3. They also stayed within budget and on schedule. The difficulty they faced was designing modules based on electronic components and sensor...

  14. Does supplier evaluation impact process improvement?

    Directory of Open Access Journals (Sweden)

    Shiva Prasad h c

    2016-09-01

    Full Text Available Purpose: The research explores and examines factors for supplier evaluation and its impact on process improvement particularly aiming on a steel pipe manufacturing firm in Gujarat, India. Design/Methodology/approach: The conceptual research framework was developed and hypotheses were stated considering the analysis of literature and discussions with the managers and engineers of a steel pipe manufacturing company in Gujarat, India. Data was collected using in-depth interview. The questionnaire primarily involves the perception of evaluation of supplier. Factors influencing supplier evaluation and its influence on process improvement is also examined in this study. The model testing and validation was done using partial least square method. Outcomes signified that the factors that influence evaluation of the supplier are quality, cost, delivery and supplier relationship management. Findings: The study depicted that quality and cost factors for supplier evaluation are insignificant. The delivery and supplier relationship management have significant influence on evaluation of the supplier. The research also depicted that supplier evaluation has significant influence on process improvement. Research limitations/implications: The study has been made specifically for ABC steel pipe manufacturing industry in Gujarat, India and may not be appropriate to the other industries or any parts of the world. There is a possibility of response bias as the conclusions of this research was interpreted on survey responses taken from the employees of case study company, so it is suggested that future research can overcome this problem by employing various methodologies in addition to surveys like carrying out focus group and in-depth interviews, brainstorming sessions with the experts etc. Originality/value: Many researchers have considered quality, cost and delivery as the factors for evaluating the suppliers. But for a company it is quintessential to have good

  15. A Framework for Assessing and Managing Large Purchaser - Minority Supplier Relationships in Supplier Diversity Initiatives

    OpenAIRE

    Theodorakopoulos, Nicholas; Ram, Monder

    2008-01-01

    Supplier diversity initiatives can function as platforms for EMSs strategic learning (Theodorakopoulos et al., 2005; Theodorakopoulos & Ram, 2006) and the scant research in supplier diversity underscores the importance of relationship factors to the success of supplier diversity/development programmes (e.g. Pearson et al., 1993). However, purchaser-supplier relationship management as a vehicle for enhancing EMSs learning and supply capabilities has not been examined to any length within the c...

  16. High average power diode pumped solid state lasers for CALIOPE

    International Nuclear Information System (INIS)

    Comaskey, B.; Halpin, J.; Moran, B.

    1994-07-01

    Diode pumping of solid state media offers the opportunity for very low maintenance, high efficiency, and compact laser systems. For remote sensing, such lasers may be used to pump tunable non-linear sources, or if tunable themselves, act directly or through harmonic crystals as the probe. The needs of long range remote sensing missions require laser performance in the several watts to kilowatts range. At these power performance levels, more advanced thermal management technologies are required for the diode pumps. The solid state laser design must now address a variety of issues arising from the thermal loads, including fracture limits, induced lensing and aberrations, induced birefringence, and laser cavity optical component performance degradation with average power loading. In order to highlight the design trade-offs involved in addressing the above issues, a variety of existing average power laser systems are briefly described. Included are two systems based on Spectra Diode Laboratory's water impingement cooled diode packages: a two times diffraction limited, 200 watt average power, 200 Hz multi-rod laser/amplifier by Fibertek, and TRW's 100 watt, 100 Hz, phase conjugated amplifier. The authors also present two laser systems built at Lawrence Livermore National Laboratory (LLNL) based on their more aggressive diode bar cooling package, which uses microchannel cooler technology capable of 100% duty factor operation. They then present the design of LLNL's first generation OPO pump laser for remote sensing. This system is specified to run at 100 Hz, 20 nsec pulses each with 300 mJ, less than two times diffraction limited, and with a stable single longitudinal mode. The performance of the first testbed version will be presented. The authors conclude with directions their group is pursuing to advance average power lasers. This includes average power electro-optics, low heat load lasing media, and heat capacity lasers

  17. Production Systems and Supplier Selection

    DEFF Research Database (Denmark)

    Pedraza-Acosta, Isabel; Pilkington, Alan; Barnes, David

    2016-01-01

    strategic stamping suppliers. Findings: Our contribution is the multi-phased production and product innovation process. This is an advance from traditional supplier selection and also an extension of ideas of supplier-located product development as it includes production system development, and complements...

  18. Managing interdependencies in supplier networks

    OpenAIRE

    Catarina Roseira; Carlos Brito

    2010-01-01

    Building and managing a supplier base has been referred to in the literature as a key aspect of supplier management. Scholars have proposed a number of models aimed at enhancing the effectiveness of supplier network management, mainly based on a portfolio approach. In the IMP tradition of research, those models are often criticized as they ignore the interdependencies between the different existing dyadic relationships of a focal buyer company and its suppliers. Such interdependencies are the...

  19. A multi-supplier sourcing problem with a preference ordering of suppliers

    NARCIS (Netherlands)

    Honhon, D.B.L.P.; Gaur, V.; Seshadri, S.

    2012-01-01

    We study a sourcing problem faced by a firm that seeks to procure a product or a component from a pool of alternative suppliers. The firm has a preference ordering of the suppliers based on factors such as their past performance, quality, service, geographical location, and financial strength, which

  20. Competitive and Cooperative Degree in Supply Chain: Supplier Selection between Competitors and Third-Party Suppliers

    OpenAIRE

    Xie, Bo; Wang, Xianjia; Zhou, Chuan

    2014-01-01

    Part 5: Modelling and Simulation; International audience; This work explores the firm’s supplier selection question that the competitor firm and the third-party supplier can supply the substitutable component. We consider a supply chain with two competing original equipment manufacturers (OEMs) and two third-party suppliers. The two OEMs produce the competing products which are comprised by two main components. Each OEM only can produce one component in-house and each third-party supplier onl...

  1. The emerging nuclear suppliers

    International Nuclear Information System (INIS)

    Dunn, L.A.

    1990-01-01

    Since the early 1980s, a growing amount of attention has been paid to a small group of mostly developing countries that have come to be called the emerging nuclear suppliers. Argentina and Brazil, China and South Korea, India and Pakistan, Spain and Yugoslavia have frequently been mentioned in this category. Their actual and potential nuclear export dealings and policies have been the subject of academic writings and policy papers, of scholarly symposia and exchanges at meetings of the traditional nuclear suppliers. With foundation and other support, UCLA's Center for International and Strategic Affairs has begun a major project to develop a database on the transactions, policies, and export control institutions of the emerging suppliers. This chapter provides some guidelines for policy toward the emerging nuclear suppliers

  2. Benchmarking Supplier Development: An Empirical Case Study of Validating a Framework to Improve Buyer-Supplier Relationship

    OpenAIRE

    Shahzad Khuram; Sillanpää Ilkka; Sillanpää Elina; Imeri Shpend

    2016-01-01

    In today’s dynamic business environment, firms are required to utilize efficiently and effectively all the useful resources to gain competitive advantage. Supplier development has evolved as an important strategic instrument to improve buyer supplier relationships. For that reason, this study focuses on providing the strategic significance of supplier development approaches to improve business relationships. By using qualitative research method, an integrated framework of supplier development...

  3. A Method Based on Intuitionistic Fuzzy Dependent Aggregation Operators for Supplier Selection

    Directory of Open Access Journals (Sweden)

    Fen Wang

    2013-01-01

    Full Text Available Recently, resolving the decision making problem of evaluation and ranking the potential suppliers have become as a key strategic factor for business firms. In this paper, two new intuitionistic fuzzy aggregation operators are developed: dependent intuitionistic fuzzy ordered weighed averaging (DIFOWA operator and dependent intuitionistic fuzzy hybrid weighed aggregation (DIFHWA operator. Some of their main properties are studied. A method based on the DIFHWA operator for intuitionistic fuzzy multiple attribute decision making is presented. Finally, an illustrative example concerning supplier selection is given.

  4. Model Penjadwalan Pengiriman Pasokan pada Strategi Multi-Supplier dengan Variasi Harga dan Lead Time untuk Permintaan Stokastik

    Directory of Open Access Journals (Sweden)

    Nur Aini Masruroh

    2015-06-01

    Full Text Available Multi-supplier is one of the strategies to minimize holding cost and average stock-out cost as long as to stabilize the supply of raw materials. The common problems that the firms may face when applying the multi-supplier strategy are determining the right schedule and quantity ordered for each supplier. Complexity of the problem increases with the facts that each supplier may have different parameters, demand is uncertain, and the firms’ constraints. Thus, this research is done to answer two main objectives: (1 to determine the optimum safety time (minimum raw material inventory to prevent the stockout due to the demand uncertainty and (2 to determine the right schedule and quantity ordered for each supplier considering the different suppliers parameters: price, lead time, and supply capacity. The problem is modeled in Mixed Integer Linear Programming with total minimum inventory cost as the objective. With the aim of testing the model, a case of multinational company that apply the multi-supplier strategy is used.

  5. ATLAS recognises its best suppliers

    CERN Multimedia

    2002-01-01

    The ATLAS Collaboration has recently rewarded two of its suppliers in the construction of very major detector components, fabricated in Japan. The ATLAS Supplier Award in recognition of excellent supplier performance has just been attributed to Kawasaki Heavy Industries, while Toshiba Corporation received the award two months ago at their headquarters in Japan.

  6. Antecedents and Outcomes of Supplier Innovativeness in International Customer-Supplier Relationships: The Role of Knowledge Distance

    OpenAIRE

    Jean, Ruey-Jer "Bryan"; Sinkovics, Rudolf R.; Kim, Daekwan

    2017-01-01

    The increasing competitive pressures and speed of R&D and product innovation is prompting many multinational enterprise customers to outsource their core activities to suppliers. Despite organizational challenges due to cultural and physical separation from their partners, these are now charged with supplier-driven innovation. This study looks at key drivers of supplier innovativeness, examines the role of cross-national differences in shaping supplier innovativeness and examines the impa...

  7. Sourcing for Quality: Cooperating with a Single Supplier or Developing Two Competing Suppliers?

    Directory of Open Access Journals (Sweden)

    Jingxian Chen

    2016-01-01

    Full Text Available Supplier efforts regarding product quality are an important issue in outsourcing and play a critical role in a manufacturer’s choice of sourcing strategy. Consider a manufacturer that wants to outsource the manufacturing of two substitute products to external suppliers. This paper studies the strategic interactions under two sourcing strategies: single and dual sourcing. A four-stage noncooperative game model is established to describe each member’s decisions. We further propose four decision scenarios: single sourcing with and without manufacturer quality investment sharing and dual sourcing when suppliers cooperate or do not cooperate on quality decisions. By the backward induction approach, we obtain analytical equilibrium solutions for each decision scenario. By comparing each pair of equilibrium profiles, we find that an appropriate proportion of quality investment sharing by the manufacturer can enable a cooperating strategy with a single supplier to be the dominant strategy. When the manufacturer does not want to share or does not want to share a relatively large portion of its supplier’s quality investment, it will always prefer to develop two competing suppliers when the cost of dual sourcing is sufficiently low. However, dual sourcing can be extremely risky for the manufacturer because the suppliers could provide a relatively low product quality level by cooperating on the quality decision to extract the manufacturer’s profit.

  8. Identifying tier one key suppliers.

    Science.gov (United States)

    Wicks, Steve

    2013-01-01

    In today's global marketplace, businesses are becoming increasingly reliant on suppliers for the provision of key processes, activities, products and services in support of their strategic business goals. The result is that now, more than ever, the failure of a key supplier has potential to damage reputation, productivity, compliance and financial performance seriously. Yet despite this, there is no recognised standard or guidance for identifying a tier one key supplier base and, up to now, there has been little or no research on how to do so effectively. This paper outlines the key findings of a BCI-sponsored research project to investigate good practice in identifying tier one key suppliers, and suggests a scalable framework process model and risk matrix tool to help businesses effectively identify their tier one key supplier base.

  9. Supplier Selection Using Fuzzy Inference System

    Directory of Open Access Journals (Sweden)

    hamidreza kadhodazadeh

    2014-01-01

    Full Text Available Suppliers are one of the most vital parts of supply chain whose operation has significant indirect effect on customer satisfaction. Since customer's expectations from organization are different, organizations should consider different standards, respectively. There are many researches in this field using different standards and methods in recent years. The purpose of this study is to propose an approach for choosing a supplier in a food manufacturing company considering cost, quality, service, type of relationship and structure standards of the supplier organization. To evaluate supplier according to the above standards, the fuzzy inference system has been used. Input data of this system includes supplier's score in any standard that is achieved by AHP approach and the output is final score of each supplier. Finally, a supplier has been selected that although is not the best in price and quality, has achieved good score in all of the standards.

  10. Local sourcing and technology spillovers to Mexican suppliers: How important are FDI and supplier characteristics?

    NARCIS (Netherlands)

    Jordaan, J.A.

    2011-01-01

    I present novel direct evidence on the static and dynamic impact of producer firms on local suppliers based on several firm level surveys that I conducted among producer firms and suppliers in Nuevo León, Mexico. I find that the level of use of suppliers does not differ between foreign direct

  11. 22 CFR 130.7 - Supplier.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Supplier. 130.7 Section 130.7 Foreign Relations... § 130.7 Supplier. Supplier means any person who enters into a contract with the Department of Defense for the sale of defense articles or defense services valued in an amount of $500,000 or more under...

  12. Ecolo Watt. Ecologic comparison of electricity providers

    International Nuclear Information System (INIS)

    2007-09-01

    As consumers now can choose their electricity provider, Greenpeace proposes Ecolo Watt, a system which assesses the different providers, more particularly in terms of protection of the environment. This document first describes the electricity market liberalisation (principle, market opening process, a shake-up of the French electric landscape, obligations for the providers). It presents the green electricity market (original guarantees, the questionable system of green certificates, and the Eve label). It describes the methodology adopted for the Ecolo Watt comparative assessment: assessment criteria, final mark. It presents the ranking of electricity providers while analysing their energy mix, their energy policy, their energy service and sales policy, the quality and transparency of information). Detailed results are presented for each operator

  13. Matching to Openly Innovate with Suppliers

    DEFF Research Database (Denmark)

    Laursen, Linda Nhu

    2017-01-01

    heterogeneous suppliers with the internal organisation in order to openly innovate. More specifically, it focuses on a governance mode, recently emerged in practice, by which firms summon their suppliers and their own internal organisation at an event to match them for open innovation activities – innovation......When large firms choose to involve their many suppliers in open innovation, they are faced with a set of challenges pertaining to the governance of several suppliers. Suppliers are heterogeneous, offering heterogeneous materials, products, information, services, and knowledge, which are differently...... organized across functions and hierarchies. To make use of such heterogeneous resources, a critical challenge for open innovation is to pair a supplier resource with a suitable opportunity-for-use from within the firm – a challenge of matching. This dissertation addresses the challenge of matching...

  14. Coil motion effects in watt balances: a theoretical check

    Science.gov (United States)

    Li, Shisong; Schlamminger, Stephan; Haddad, Darine; Seifert, Frank; Chao, Leon; Pratt, Jon R.

    2016-04-01

    A watt balance is a precision apparatus for the measurement of the Planck constant that has been proposed as a primary method for realizing the unit of mass in a revised International System of Units. In contrast to an ampere balance, which was historically used to realize the unit of current in terms of the kilogram, the watt balance relates electrical and mechanical units through a virtual power measurement and has far greater precision. However, because the virtual power measurement requires the execution of a prescribed motion of a coil in a fixed magnetic field, systematic errors introduced by horizontal and rotational deviations of the coil from its prescribed path will compromise the accuracy. We model these potential errors using an analysis that accounts for the fringing field in the magnet, creating a framework for assessing the impact of this class of errors on the uncertainty of watt balance results.

  15. Evaluation of Watts Bar Nuclear Plant Unit 1 Technical Specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Watts Bar Nuclear Plant Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumption of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Watts Bar T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Watts Bar Nuclear Plant Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  16. Managing uncertainty in potential supplier identification

    OpenAIRE

    Ye , Yun ,; Jankovic , Marija; Okudan Kremer , Gül E.; Bocquet , Jean-Claude

    2014-01-01

    International audience; As a benefit of modularization of complex systems, Original Equipment Manufacturers (OEMs) can choose suppliers in a less constricted way when faced with new or evolving requirements. Before a supplier is selected for each module, a group of potential suppliers should be identified in order to control the uncertainty along with other performance measures of the new system development. In modular design, because suppliers are more involved in system development, the pot...

  17. Theology and psychology – the interdisciplinary work of Fraser Watts

    Directory of Open Access Journals (Sweden)

    Willem J. Smith

    2005-10-01

    Full Text Available In the preface to his book, Theology and Psychology, Fraser Watts, a lecturer in Theology and Natural Science at the University of Cambridge, states that he approaches “… the interface between theology and psychology by looking at each discipline from the perspective of the other. This includes a religious perspective on several current hot topics in psychology, such as evolution, neuroscience, and computer intelligence. I also consider theological topics like divine action, salvation history and eschatology, in each case using the psychological perspective in a different way”. By taking an interdisciplinary approach, Watts aims at proposing a psychology of religious experience. He considers theology to be the rational reflection on the Christian tradition. When exponents of this tradition are in dialogue with exponents of psychology, the focus falls on human nature. Watts admits that a certain lack of competence in one of the two disciplines can be a problem when working in an interdisciplinary way. However, he is willing to take the risk. Watts worked in psychology for 25 years and was also involved with a medical research council, before taking up a position at the Faculty of Divinity, University of Cambridge.

  18. Supplier selection using different metric functions

    Directory of Open Access Journals (Sweden)

    Omosigho S.E.

    2015-01-01

    Full Text Available Supplier selection is an important component of supply chain management in today’s global competitive environment. Hence, the evaluation and selection of suppliers have received considerable attention in the literature. Many attributes of suppliers, other than cost, are considered in the evaluation and selection process. Therefore, the process of evaluation and selection of suppliers is a multi-criteria decision making process. The methodology adopted to solve the supplier selection problem is intuitionistic fuzzy TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution. Generally, TOPSIS is based on the concept of minimum distance from the positive ideal solution and maximum distance from the negative ideal solution. We examine the deficiencies of using only one metric function in TOPSIS and propose the use of spherical metric function in addition to the commonly used metric functions. For empirical supplier selection problems, more than one metric function should be used.

  19. Evaluating supplier quality performance using analytical hierarchy process

    Science.gov (United States)

    Kalimuthu Rajoo, Shanmugam Sundram; Kasim, Maznah Mat; Ahmad, Nazihah

    2013-09-01

    This paper elaborates the importance of evaluating supplier quality performance to an organization. Supplier quality performance evaluation reflects the actual performance of the supplier exhibited at customer's end. It is critical in enabling the organization to determine the area of improvement and thereafter works with supplier to close the gaps. Success of the customer partly depends on supplier's quality performance. Key criteria as quality, cost, delivery, technology support and customer service are categorized as main factors in contributing to supplier's quality performance. 18 suppliers' who were manufacturing automotive application parts evaluated in year 2010 using weight point system. There were few suppliers with common rating which led to common ranking observed by few suppliers'. Analytical Hierarchy Process (AHP), a user friendly decision making tool for complex and multi criteria problems was used to evaluate the supplier's quality performance challenging the weight point system that was used for 18 suppliers'. The consistency ratio was checked for criteria and sub-criteria. Final results of AHP obtained with no overlap ratings, therefore yielded a better decision making methodology as compared to weight point rating system.

  20. Reuse of Expired Cefort Drug in Nickel Electrodeposition From Watts Bath

    Directory of Open Access Journals (Sweden)

    Delia-Andrada Duca

    2017-06-01

    Full Text Available This paper demonstrates the possibility to use ceftriaxone (CEFTR active compound from expired Cefort as additive in nickel electrodeposition from Watts baths. Electrochemical behaviour and the influence of CEFTR on nickel electroplating were studied by electrochemical methods. Experimental data recommends CEFTR as additive in nickel electroplating from Watts baths.

  1. An integrated model for supplier selection process

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    In today's highly competitive manufacturing environment, the supplier selection process becomes one of crucial activities in supply chain management. In order to select the best supplier(s) it is not only necessary to continuously tracking and benchmarking performance of suppliers but also to make a tradeoff between tangible and intangible factors some of which may conflict. In this paper an integration of case-based reasoning (CBR), analytical network process (ANP) and linear programming (LP) is proposed to solve the supplier selection problem.

  2. GSFC Supplier Surveillance

    Science.gov (United States)

    Kelly, Michael P.

    2011-01-01

    Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

  3. Stray capacitances in the watt balance operation: electrostatic forces

    DEFF Research Database (Denmark)

    Quagliotti, Danilo; Mana, G.

    2014-01-01

    In a watt balance, stray capacitances exist between the coil and the magnet. Since the electric current flowing in the coil creates a difference in electric potentials between the coil and magnet, their electrostatic interactions must be taken into account. This paper reports the results of a fin......In a watt balance, stray capacitances exist between the coil and the magnet. Since the electric current flowing in the coil creates a difference in electric potentials between the coil and magnet, their electrostatic interactions must be taken into account. This paper reports the results...

  4. Affecting the value chain through supplier kaizen.

    Science.gov (United States)

    Forman, C R; Vargas, D H

    1999-02-01

    In the aerospace industry, typically 60 percent of a product's cost and 70 percent of the lead time are due to purchased material. To affect price and customer responsiveness, improvement initiatives must be extended into the supply chain. Many companies have developed supply base management systems that include long-term agreements with suppliers, partnering with suppliers in risk taking and product design, information sharing, and quality and delivery rating systems. The premise is that suppliers are an extension of the factory. But to take full advantage of customer-supplier relationships, the suppliers must be "developed" in the same manner as a manufacturing unit. Supplier kaizen is a method of bringing suppliers to the same level of operations as the parent company, through training and improvement projects, to ensure superior performance and nurture the trust that is required for strong partnerships. This article describes Sikorsky Aircraft's use of kaizen to improve its supply base management.

  5. Performance Determinants for Convenience Store Suppliers

    OpenAIRE

    Zainah Abdullah; Aznur Hajar Abdullah

    2012-01-01

    This paper examines the impact of information and communication technology (ICT) usage, internal relationship, supplier-retailer relationship, logistics services and inventory management on convenience store suppliers- performance. Data was collected from 275 convenience store managers in Malaysia using a set of questionnaire. The multiple linear regression results indicate that inventory management, supplier-retailer relationship, logistics services and internal relation...

  6. Supplier Selection by Coupling-Attribute Combinatorial Analysis

    Directory of Open Access Journals (Sweden)

    Xinyu Sun

    2017-01-01

    Full Text Available Increasing reliance on outsourcing has made supplier selection a critical success factor for a supply chain/network. In addition to cost, the synergy among product components and supplier selection criteria should be considered holistically during the supplier selection process. This paper shows this synergy using coupled-attribute analysis. The key coupling attributes, including total cost, quality, delivery reliability, and delivery lead time of the final product, are identified and formulated. A max-max model is designed to assist the selection of the optional combination of suppliers. The results are compared with the individual supplier selection. Management insights are also discussed.

  7. Texture and microstructure evolution in nickel electrodeposited from an additive-free Watts electrolyte

    DEFF Research Database (Denmark)

    Alimadadi, Hossein; da Silva Fanta, Alice Bastos; Kasama, Takeshi

    2016-01-01

    Nickel layers with 〈100〉, 〈210〉, 〈110〉 and 〈211〉 fiber textures were electrodeposited from additive-free Watts type electrolytes by adjusting both the pH and the applied current density. Quantitative crystallographic texture analysis by XRD was supplemented by micro-texture analysis applying EBSD....... While XRD results correspond to absorption-weighted averages over the top part of the layer, EBSD on the cross section allowed studying the texture evolution as a function of distance to the substrate. Although layer growth started on amorphous substrates, implying that nucleation occurs unbiased...

  8. The competition for supplier resources

    NARCIS (Netherlands)

    Pulles, Niels Jaring

    2014-01-01

    Suppliers can have a major influence on the overall competitiveness of a firm. When firms lack certain capabilities or resources within their own organization, collaborations with suppliers can help them to acquire these resources and capabilities externally and improve competitive advantage.

  9. Multiattribute Supplier Selection Using Fuzzy Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Serhat Aydin

    2010-11-01

    Full Text Available Supplier selection is a multiattribute decision making (MADM problem which contains both qualitative and quantitative factors. Supplier selection has vital importance for most companies. The aim of this paper is to provide an AHP based analytical tool for decision support enabling an effective multicriteria supplier selection process in an air conditioner seller firm under fuzziness. In this article, the Analytic Hierarchy Process (AHP under fuzziness is employed for its permissiveness to use an evaluation scale including linguistic expressions, crisp numerical values, fuzzy numbers and range numerical values. This scale provides a more flexible evaluation compared with the other fuzzy AHP methods. In this study, the modified AHP was used in supplier selection in an air conditioner firm. Three experts evaluated the suppliers according to the proposed model and the most appropriate supplier was selected. The proposed model enables decision makers select the best supplier among supplier firms effectively. We confirm that the modified fuzzy AHP is appropriate for group decision making in supplier selection problems.

  10. INTEGRASI METODE ANP DAN TOPSIS DALAM EVALUASI KINERJA SUPPLIER DAN PENENTUAN PRIORITAS SUPPLIER BAHAN BAKU UTAMA CETAK KORAN PADA PT MASSCOM GRAPHY SEMARANG

    Directory of Open Access Journals (Sweden)

    Darminto Pujotomo

    2017-01-01

      One of the factors that influence the company performance is the presence of suppliers which supplies raw materials. PT Masscom Graphy Semarang is a printing company which has cooperated with several suppliers to ensure continuity of production. Therefore,  supplier performance evaluation conducted by the company is very important to obtain a reliable supplier in the supply of raw materials. The purpose of this research was to identify the supplier performance evaluation criteria and priorities of suppliers in accordance with the company's needs, and determined the priority order of the main raw material supplier for newspaper print. There was 17 sub-criteria used in evaluating the performance of suppliers and prioritization of suppliers. Analytical Network Process (ANP can be used as an alternative to solve a problem that had many interrelated sub-criteria or influence in decision making. Furthermore, the method Technique For Orders Preference by Similarity to Ideal Solution (TOPSIS was used for ranking suppliers. Based on the weighted sub-criteria by using ANP, the most influence subcriteria in determining the priority of suppliers offering price of 0.17227. Furthermore, to the supplier prioritization was done by using the TOPSIS method and obtained the order suppliers for raw materials paper roll was a supplier A, B, C, and D, while the raw material for the ink web was a supplier of L, N, O and M.

  11. 47 CFR 68.320 - Supplier's Declaration of Conformity.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Supplier's Declaration of Conformity. 68.320... Approval § 68.320 Supplier's Declaration of Conformity. (a) Supplier's Declaration of Conformity is a... Supplier's Declaration of Conformity attaches to all items subsequently marketed by the responsible party...

  12. Supplier evaluation: The first step in effective sourcing

    Directory of Open Access Journals (Sweden)

    Kateřina Pikousová

    2013-10-01

    Full Text Available The evaluation and selection of suppliers are important tasks in any organisation. Each organisation needs to have a supplier evaluation matrix or model in place. The goal of this article is not only to give an overview of supplier performance evaluation techniques but also to present an example of such a supplier evaluation matrix used in practice. The article shows that suppliers’ qualities, strategies and abilities affect a buying company’s business. Reliable suppliers can help to develop stabile, long-term relationships that will be beneficial to both parties. Effective sourcing and purchasing require high-quality suppliers.

  13. 75 FR 6257 - Watts Bar Reservoir Land Management Plan, Loudon, Meigs, Rhea, and Roane Counties, TN

    Science.gov (United States)

    2010-02-08

    ... TENNESSEE VALLEY AUTHORITY Watts Bar Reservoir Land Management Plan, Loudon, Meigs, Rhea, and... Watts Bar Reservoir in Tennessee. On November 19, 2009, the TVA Board of Directors (TVA Board) decided... the final environmental impact statement (FEIS) for the Watts Bar Reservoir Land Management Plan...

  14. 42 CFR 424.57 - Special payment rules for items furnished by DMEPOS suppliers and issuance of DMEPOS supplier...

    Science.gov (United States)

    2010-10-01

    ..., telephone, computer, e-mail, instant messaging or in-person contact, by a DMEPOS supplier or its agents to a... communication records). (F) Is in a location that contains space for retaining the necessary ordering and... covers both the supplier's place of business and all customers and employees of the supplier. In the case...

  15. The Navy’s Superior Supplier Incentive Program: Analysis of Supplier Proposed Benefits

    Science.gov (United States)

    2015-12-01

    rather than “short-term, easy, expendable and replaceable sources of goods and services” (Carter & Choi, 2008, p. 2). Japanese automakers Toyota ...was the key element behind Toyota and Honda’s strategic successes. Under the supplier keiretsu, the automakers worked closely with the selected...suppliers to achieve mutually beneficial objectives. Toyota and Honda implemented the keiretsu model in their North American plants and achieved

  16. The Frequency-Watt Function: Simulation and Testing for the Hawaiian Electric Companies

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, Anderson F. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Nelson, Austin A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tan, Jin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mahmud, Rasel [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gevorgian, Vahan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elkhatib, Mohamed [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Antonio, Chris [Hawaiian Electric Companies, Honolulu, HI (United States); Arakawa, Dean [Hawaiian Electric Companies, Honolulu, HI (United States); Fong, Ken [Hawaiian Electric Companies, Honolulu, HI (United States)

    2017-07-25

    This interim report describes research related to frequency-watt control of solar photovoltaic (PV) inverters conducted under the U.S. Department of Energy's Grid Modernization Laboratory Consortium (GMLC) by a regional partnership for Hawaii. The purpose of this report is to inform an ongoing discussion around frequency-watt control activation in Hawaii.

  17. ATLAS recognises its best suppliers

    CERN Multimedia

    Jenni, P

    The ATLAS Collaboration has recently rewarded two of its suppliers in the construction of very major detector components, fabricated in Japan. The ATLAS Supplier Award in recognition of excellent supplier performance was attributed on 2nd September 2002 during a ceremony in Hall 180 to Kawasaki Heavy Industries, while Toshiba Corporation received the award two months before at their headquarters in Japan. The ATLAS experiment will become a reality thanks to a large international collaboration partnership. The industrial suppliers for the components all over the world play a major role in the construction of this gigantic jigsaw for the LHC. And sometimes they perform so well, that their work deserves specially to be recognised. This is the case for Kawasaki Heavy Industries and Toshiba Corporation, producers of the Liquid Argon Barrel Cryostat and of the Superconducting Central Solenoid, respectively. With these awards, the ATLAS Collaboration wants to congratulate Kawasaki and Toshiba for fulfilling the hi...

  18. Design and Performance of 20 Watts Portable Solar Generator

    International Nuclear Information System (INIS)

    Majid, Z A Abdul; Hazali, N; Hanafiah, M A K M; Abdullah, A A; Ismail, A F; Ruslan, M H; Sopian, K; Azmi, M S Mohd

    2012-01-01

    A new portable solar generator has been developed to generate electricity. It has the potential to replace petrol generator, widely used by peddlers at night markets (pasar malam). Conventional generators are heavy, oily, have high maintenance and use fossil fuel to generate electricity. The solar generator can generate 20 Watts of electricity. This amount of power can supply up to 96 hours of electricity for the purpose of lighting and running small electrical appliances. The power output is (alternating current) AC current using 150 Watts inverter with 200 Watts surge, suitable for all commercial single phase electric appliances. Solar charge controller is used to maximize the charging rate and to protect the battery. The system has low maintenance whereby the batteries need to be changed every three to four years, depending on the usage. The main concepts of portable solar generator are to reduce installation cost and to introduce a compact design of an optimal energy sizing system. The materials used to develop the solar generator can be easily obtained from local markets, thus reducing the cost of developing the system and making it suitable for commercialization.

  19. Critical elements of supplier development in the Malaysian automobile industry : Parts and components procurement and supplier development Practice at Proton【Article】

    OpenAIRE

    Abdullah, Rashid; Maharjan, Keshav Lall

    2003-01-01

    Supplier development is defined as any effort of a buying firm with regard to its supplier to increasethe performance and/or capabilities of the supplier to meet the buying firm's supply needs. The procure-ment practice of the buyer is critical and acts as a window to nurture the supplier development effort, itis also crucial in determining the type of relationship that the company has with its suppliers. This paperexamines the procurement practice at PROTON for parts and component inputs at ...

  20. The Watts-Strogatz network model developed by including degree distribution: theory and computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Y W [Surface Physics Laboratory and Department of Physics, Fudan University, Shanghai 200433 (China); Zhang, L F [Surface Physics Laboratory and Department of Physics, Fudan University, Shanghai 200433 (China); Huang, J P [Surface Physics Laboratory and Department of Physics, Fudan University, Shanghai 200433 (China)

    2007-07-20

    By using theoretical analysis and computer simulations, we develop the Watts-Strogatz network model by including degree distribution, in an attempt to improve the comparison between characteristic path lengths and clustering coefficients predicted by the original Watts-Strogatz network model and those of the real networks with the small-world property. Good agreement between the predictions of the theoretical analysis and those of the computer simulations has been shown. It is found that the developed Watts-Strogatz network model can fit the real small-world networks more satisfactorily. Some other interesting results are also reported by adjusting the parameters in a model degree-distribution function. The developed Watts-Strogatz network model is expected to help in the future analysis of various social problems as well as financial markets with the small-world property.

  1. The Watts-Strogatz network model developed by including degree distribution: theory and computer simulation

    International Nuclear Information System (INIS)

    Chen, Y W; Zhang, L F; Huang, J P

    2007-01-01

    By using theoretical analysis and computer simulations, we develop the Watts-Strogatz network model by including degree distribution, in an attempt to improve the comparison between characteristic path lengths and clustering coefficients predicted by the original Watts-Strogatz network model and those of the real networks with the small-world property. Good agreement between the predictions of the theoretical analysis and those of the computer simulations has been shown. It is found that the developed Watts-Strogatz network model can fit the real small-world networks more satisfactorily. Some other interesting results are also reported by adjusting the parameters in a model degree-distribution function. The developed Watts-Strogatz network model is expected to help in the future analysis of various social problems as well as financial markets with the small-world property

  2. Improved partnering through supplier self-evaluation

    International Nuclear Information System (INIS)

    Owens, R.K.; Cobb, J.R.

    1993-01-01

    Early in 1989, the Virginia Power purchasing department decided that a different approach was needed for resolving supplier partnering issues and to motivate the supplier to perform as promised to purchase order requirements. Purchasing formed task teams composed of purchasing personnel and requested that they investigate and evaluate alternative methods of order administration and supplier communications. The task teams were asked to research the feasibility of using a reward/penalty approach or to suggest an alternative method to motivate results. The task teams determined that the root cause of the problems for the identified areas of concern was that purchasing personnel and supplier personnel neither communicated well nor fully understood the effect that their actions or inactions had on each other

  3. Buyer-Supplier Relationships and Power Position: Interchaining

    Directory of Open Access Journals (Sweden)

    Hebatollah Morsy

    2017-02-01

    Full Text Available According to several studies, power and interdependence play a considerable role in understanding the buyer–supplier relationships, yet, empirical research is still limited. Also, the nature of the buyer-supplier relationship and managing them might vary based on the power position of buyers and suppliers. Few studies focused on the reason behind this interrelation and strong influence of power on the buyer-supplier relationships. Thus, the purpose of this study is to gain better understanding and try to identify how power position and buyer-supplier relationships are interrelated, and whether there are common determinants and/or characteristics behind this strong bond between the two concepts. Both transaction cost analysis theory and social exchange theory were integrated in building the argument. Regarding the methodology, qualitative exploratory research design was employed by using multiple-case study as the main research method, where three multinational Egyptian organizations were selected. Moreover, data was collected using individual in-depth interviews, and analyzed through coding and cross case analysis techniques. The results showed that there are common factors that influence both buyer-supplier relationship characteristics and power position attributes. And according, the findings helped in pointing out a new lens of discussing and investigating the bond between buyer-supplier relationships ad power in research.

  4. Production control and supplier selection under demand disruptions

    Directory of Open Access Journals (Sweden)

    Xianzhe Chen

    2010-12-01

    Full Text Available This paper investigates the effects of demand disruptions on production control and supplier selection in a three-echelon supply chain system. The customer demand is modeled as a jump-diffusion process in a continuous-time setting. A two-number production-inventory policy is implemented in the production control model for the manufacturer. The objective is to minimize the long-term average total cost consisting of backlog cost, holding cost, switching cost, and ordering cost. The simulated annealing method is applied to search the optimal critical switching values. Furthermore, an improved analytical hierarchy process (AHP is proposed to select the best supplier, based on quantitative factors such as the optimal long-term total cost obtained through the simulated annealing method under demand disruptions and qualitative factors such as quality and service. Numerical studies are conducted to demonstrate the effects of demand disruptions in the face of various risk scenarios. Managerial insights from simulation results are provided as well. Our approaches can be implemented as the “stress test” for companies in front of various supply chain disruption scenarios.

  5. Managing Supplier Sustainability Risk

    OpenAIRE

    Harilainen, Hanna-Riitta

    2014-01-01

    Supply chains are increasingly global, often reaching to developing regions. The media pressure brand owners to be responsible, but a product is only as sustainable as the practices of all the companies involved in manufacturing it are. It’s not enough that the brand owner acts responsibly; sustainable practices have to reach component and raw material suppliers upstream. Image risk has often been recognized as reason for investing in sustainability. In the supply chain context, supplier m...

  6. Boosting INPO's programs with supplier know-how

    International Nuclear Information System (INIS)

    Matson, B.

    1984-01-01

    Nuclear industry suppliers, such as Stone and Webster and Babcock and Wilcox, are key participants in the Institute of Nuclear Power Operators (INPO) effort to promote technical information exchanges throughout the industry and to contribute to INPO training programs. Suppliers have 21 employees on loan to the Institute, although steps must be taken to protect proprietary information and to avoid breaking antitrust laws. Among the NUCLEAR NETWORK programs using supplier expertise is the Significant Event Evaluation and Information Network (SEE-IN), which reviews important reports involving their products. Suppliers benefit by observing evaluation teams at construction sites and plant start-ups

  7. Ethical beliefs and information asymmetries in supplier relationships

    NARCIS (Netherlands)

    Martin, K.D.; Johnson, J.L.

    2010-01-01

    Heightened ethical concerns involving upstream suppliers (e.g., Peanut Corporation of America, dairy suppliers to Chinese infant formula manufacturers) have sparked interest in how managers' knowledge of suppliers' behavior influences decision making. This article explores the role of managers'

  8. Preferred customer status, supplier satisfaction and their contingencies

    NARCIS (Netherlands)

    Vos, Frederik Guido Sebastiaan

    2017-01-01

    Over the last decades, firms shift increasingly from traditional in-house value creation strategies to cooperative buyer–supplier relationships as a source of value creation and competitive advantage. To reap extensive benefits from relationships with suppliers, assuring supplier satisfaction and

  9. Heuristics can produce surprisingly rational probability estimates: Comment on Costello and Watts (2014).

    Science.gov (United States)

    Nilsson, Håkan; Juslin, Peter; Winman, Anders

    2016-01-01

    Costello and Watts (2014) present a model assuming that people's knowledge of probabilities adheres to probability theory, but that their probability judgments are perturbed by a random noise in the retrieval from memory. Predictions for the relationships between probability judgments for constituent events and their disjunctions and conjunctions, as well as for sums of such judgments were derived from probability theory. Costello and Watts (2014) report behavioral data showing that subjective probability judgments accord with these predictions. Based on the finding that subjective probability judgments follow probability theory, Costello and Watts (2014) conclude that the results imply that people's probability judgments embody the rules of probability theory and thereby refute theories of heuristic processing. Here, we demonstrate the invalidity of this conclusion by showing that all of the tested predictions follow straightforwardly from an account assuming heuristic probability integration (Nilsson, Winman, Juslin, & Hansson, 2009). We end with a discussion of a number of previous findings that harmonize very poorly with the predictions by the model suggested by Costello and Watts (2014). (c) 2015 APA, all rights reserved).

  10. Risk factors of metabolic syndrome among food suppliers

    Directory of Open Access Journals (Sweden)

    Pasdar Yahya

    2017-01-01

    Full Text Available Introduction/Objective. As a risk factor for chronic diseases, metabolic syndrome (MS is increasing at an alarming rate. The prevalence of MS varies according to lifestyle and occupation in different populations. The present study aimed to determine the prevalence of MS and its components in food suppliers. Methods. A total of 112 food suppliers were randomly selected from all around the city. Data collection tools included demographic, physical activity, and food frequency questionnaires. Body composition was measured using Bio-Electrical Body Analyzer. A sample of 5 ml of fasting blood was taken from participants to assess lipid profile, blood sugar, insulin, and liver enzymes. The data were analyzed using χ2, Kolmogorov–Smirnov and ANOVA tests. Results. Participants’ mean BMI was 27.1 ± 3.9 kg/m2, 43.6% were overweight, and 26.4% were obese. Consumption of vegetables was less and of meats more than recommended amounts. The prevalence of MS was 45.5% (51 people, which increased with aging (p = 0.02. Among factors causing MS, the most common one was waist-to-hip ratio (WHR > 0.09 (72.7%, followed by high triglyceride and low HDL. Conclusion. In this study, the prevalence of MS among food suppliers was higher than the world average and than prevalence in other countries. WHR (or obesity was found to be the most important risk factor for MS. To reduce the risk of MS, changing dietary consumption habits and increased physical activity are recommended to persons with high risk and sedentary occupations.

  11. Supplier selection in the Malaysian telecommunications industry

    OpenAIRE

    Abdul Rahim, Suzari

    2013-01-01

    This thesis was submitted for the degree of Doctor of Philosophy and awarded by Brunel University. Supplier selection plays an important role in any organisation. This study investigates and examines supplier selection criteria and the impacts on buying firm performance; specifically focusing on the telecommunications industry in Malaysia. Previous studies in this area have focussed on the criteria such as quality, price, delivery, supplier relationship management and decision making tools...

  12. A perfect fuel supplier

    International Nuclear Information System (INIS)

    Terasvirta, R.

    2008-01-01

    WWER fuel market is dominated by the Russian fuel vendor JSC TVEL. There have been attempts to open up the market also for other suppliers, such as BNFL/Westinghouse for Finland, Czech Republic, and Ukraine. However, at the moment it seems that JSC TVEL is the only real alternative to supply fuel to WWER reactors. All existing fuel suppliers have certified quality management systems which put a special emphasis on the customer satisfaction. This paper attempts to define from the customer's point of view, what are the important issues concerning the customer satisfaction. (author)

  13. Intermediate steps towards the 2000-Watt society in Switzerland: an energy-economic scenario analysis

    International Nuclear Information System (INIS)

    Schulz, T. F.

    2007-01-01

    In this dissertation by Thorsten Frank Schulz the intermediate steps necessary to realise the 2000-Watt Society in Switzerland are examined. An analysis of an energy-economic scenario shows that the 2000-Watt Society should be seen as a long-term goal. According to the author, the major changes required to allow the implementation of this project concern energy-transformation and energy-demand technologies. Electricity will, according to the author, play an important role in a service-oriented society in the future. In such a transformation even intermediate steps are associated with considerable expense. The aims of the 2000-Watt Society project are listed. Energy and CO 2 balances for the domestic and transport sectors are presented and discussed. Complementary analyses are presented concerning fuel cells and wood-based fuel technologies. Finally, the implications of the 2000-Watt society and the effects of technological change are summarised and an outlook is presented

  14. ADAPTING BUYER-SUPPLIER RELATIONSHIP PRACTICES IN THE LOCAL INDUSTRY

    Directory of Open Access Journals (Sweden)

    Latifah Che Amad

    2008-01-01

    Full Text Available This study examines the types and extent of supplier development activities undertaken by an identified manufacturing firm, along with the importance of supplier development goals. Data was collected through a cross-sectional survey of 26 respondents, consisting of officers, engineers, managers and senior managers from various sections within the buying firm's organisation. The analysis is based primarily on descriptive statistics. The results reveal that the supplier-specific factors are more prominent predictors of the outcomes of the supplier development efforts as compared to the other factors. The manufacturer's focus on the supplier development programme appears to be a short-term, results-oriented approach involving limited or no significant efforts on the side of thebuying firm. There is evidence indicating that the manufacturer has not fully utilised the expertise of its suppliers in designing its products, since there is lack of supplier involvement in the early stages of the design and development activities. The overallresults point to numerous deficiencies in the supplier development programme. Practical implications are provided in light of the findings.

  15. A Fuzzy MCDM Approach to Evaluate Green Suppliers

    Directory of Open Access Journals (Sweden)

    Gizem Cifci

    2011-10-01

    Full Text Available Nowadays the effect of industrial production on the environment brought out the importance of the green concept in supply chains. Particularly for supplier firms, greening is essential in a supply chain because with growing worldwide awareness of environmental protection, green production has become an important theme for almost every manufacturer. While literature related to supplier evaluation is plentiful, the works on green supplier evaluation are rather limited. Therefore, a green supplier evaluation model is proposed in this study. Due to its multi-criteria nature, the green supplier evaluation process requires an appropriate multi criteria analysis and solution approach. Selecting a proper method involves an insight analysis among available multi-criteria decision making (MCDM techniques. Among numerous methods of MCDM, this paper presents a decision framework based on group decision making (GDM and fuzzy analytic hierarchy process (FAHP for evaluating and selecting green suppliers. The applicability of the proposed approach is verified through a case study.

  16. 76 FR 70169 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-11-10

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority... on NUREG-0498, ``Final Environmental Statement, Supplement 2, Related to the Operation of Watts Bar... the Nuclear Regulatory Commission. Stephen J. Campbell, Chief, Watts Bar Special Projects Branch...

  17. Supplier selection criteria and methods: past, present and future

    OpenAIRE

    MUKHERJEE, KRISHNENDU

    2014-01-01

    Sole purpose of supplier selection is not limited to get supply at low cost and at right time. Supplier selection is a strategic decision to fulfil company’s goal for long period of time at low risk. To accomplish this objective companies are moving from reactive buying to proactive buying to give more priority to co-creation of wealth with supplier/s. Considering this issue an attempt has been made in this paper to give systematic review of supplier selection and evaluation process from 2005...

  18. Construction of a new watt balance with the goal to realize the kilogram in the US

    Science.gov (United States)

    Schlamminger, Stephan; Haddad, Darine; Seifert, Frank; Chao, Leon; Newell, David; Pratt, Jon

    2015-04-01

    A watt balance is a mechanical device that compares mechanical power to electrical power. Since electrical power is measured using quantum physics by employing the Josephson effect and the Quantum Hall effect, electrical power can be measured as a product of a known factor, two frequencies, and the Planck constant h. Mechanical power is given by mgv , where m is the mass of a weight, g the local acceleration, and v the velocity. Hence, the watt balance provides a link between mass and Planck's constant. Currently several watt balances worldwide are employed to measure h. A redefinition of the international system of units (SI) is currently in discussion and may become reality as early as 2018. In the new SI, the numerical value of the Planck constant will be fixed and the watt balance is a means to realize the unit of mass. Researchers at NIST are preparing for a new SI and we have started in 2011 with plans to design a new watt balance capable of realizing the kilogram with relative uncertainties of a few parts in 108. Construction of the new watt balance has started in 2014. In my talk, I will show some of the latest results achieved with this apparatus.

  19. One watt initiative: A global effort to reduce leaking electricity

    International Nuclear Information System (INIS)

    Meier, Alan K.; LeBot, Benoit

    1999-01-01

    Many domestic appliances and commercial equipment consume some electric power when they are switched off or not performing their primary purpose. The typical loss per appliance is low (from 1 to 25 W) but, when multiplied by the billions of appliances in houses and in commercial buildings, standby losses represent a significant fraction of total electricity use. Several initiatives to reduce standby losses have appeared in different parts of the world. One proposal, the 1-watt plan, seeks to harmonize these initiatives by establishing a single target for all appliances. This paper explains the background to the 1-watt plan, identifies some unresolved aspects, and gives some estimates of energy savings

  20. A SUPPLIER SELECTION MODEL FOR SOFTWARE DEVELOPMENT OUTSOURCING

    Directory of Open Access Journals (Sweden)

    Hancu Lucian-Viorel

    2010-12-01

    Full Text Available This paper presents a multi-criteria decision making model used for supplier selection for software development outsourcing on e-marketplaces. This model can be used in auctions. The supplier selection process becomes complex and difficult on last twenty years since the Internet plays an important role in business management. Companies have to concentrate their efforts on their core activities and the others activities should be realized by outsourcing. They can achieve significant cost reduction by using e-marketplaces in their purchase process and by using decision support systems on supplier selection. In the literature were proposed many approaches for supplier evaluation and selection process. The performance of potential suppliers is evaluated using multi criteria decision making methods rather than considering a single factor cost.

  1. Micro watt thermocurrent generator

    International Nuclear Information System (INIS)

    Bustard, T.; Goslee, D.; Barr, H.

    1976-01-01

    This nuclear thermocurrent generator to feed a cardic pacemaker should have higher life expectancy and reliability than was previously achieved. For this purpose a gettering arrangement is connected to be heat conducting immediately adjacent to the nuclear fuel arrangement in an evacuated casing. The gettering arrangement can be operated to activate at as high a temperature as possible, from 121 0 C to preferably about 204 0 C, so that a high vacuum is maintained. The current generating thermal column works at a temperature difference of 55.6 0 C. As the cold end of the column is connected to the outer casing, and should be held to a mean body temperature of 37.8 0 C, the hot side of the thermal column may only be heated to 93.4 0 C. The temperature jump from 121 0 or 204 0 to 93.4 0 is produced by a thermal resistance inserted between the hot side of the thermal column and the fuel arrangement. It may consist of a spacer made of stainless steel or by a gap, while in this first arrangement the nuclear heat generator is situated between the gettering arrangement and the thermal column, another arrangement shows the gettering arrangement enclosed in the fuel arrangement and thermal column. Here the heat flows in one direction only, the required temperature gradient is produced by suitable construction of the heat contacts between the 3 elements. Detailed constructional and manufacturing data are given for both models. Plutonium oxide is welded into a double casing as heat generator, in example the casing is made of nickel alloy. 1/10 gram of plutonium supplies a thermal energy of 50m watts, which produces a thermal current of 300 to 400 micro watts at 0.3V. (RW) [de

  2. CMS and ATLAS honour their suppliers

    CERN Multimedia

    2001-01-01

    In order to motivate the hundreds of companies building their detectors, the CMS and ATLAS collaborations have recently been handing out awards of excellence to their top suppliers. At its second ceremony of this kind, CMS honoured four of its suppliers, while ATLAS for the first time paid tribute to two of its contractors. The atmosphere in the Council Chamber was festive rather than formal at the start of CMS week on Monday 5 March. Before embarking upon a long series of seminars and presentations, the Collaboration held its second awards ceremony to honour its top suppliers. By paying tribute to the exceptional efforts of certain suppliers, the Collaboration's aim is to motivate all the firms, some 500 in total, taking part in the experiment's construction. The CMS Awards panel thus singles out contractors who have not only provided full satisfaction in terms of compliance with specifications, quality and deadlines, but have in addition provided original solutions to delicate problems. Four firms came away...

  3. CMS rewards eight of its suppliers

    CERN Multimedia

    2002-01-01

    At the third awards ceremony to honour its top suppliers, the CMS collaboration presented awards to eight firms. Seven of them are involved in the manufacture of the magnet. The winners of the third CMS suppliers' awards visit the assembly site for the detector. Unsurprisingly, the CMS magnet was once again in the limelight at the third awards ceremony in honour of the collaboration's top suppliers. 'Unsurprisingly', because this magnet, which must produce an intense field of 4 Tesla inside an enormous volume (12 metres in diameter and 13 metres in length) is the detector's key component. As a result, many firms are involved in its construction. The CMS suppliers' awards are an annual event aimed at rewarding the exceptional efforts of certain companies. Firms are only eligible once they have delivered at least 50% of their supplies. This year, the collaboration honoured eight firms at a ceremony held on Monday 4 March in the main auditorium. Seven of th...

  4. Supplier Contribution to Profit Calculation and Supplier’s Expense Levels

    Directory of Open Access Journals (Sweden)

    Danilo Dorović

    2015-05-01

    Full Text Available Suppliers of goods present a very important cost object for trading companiessuch as retail. There is, however, no theoretical explanation as to how to calculate a contribution to profits generated from an individual supplier. This calculation is the subject of the paper. There is no calculation that shows how goods, provided from the supplier, create profit through gross margin and how the supplier`s behavior influences the costs (like delivery terms, costs of keeping specific goods fresh…. The final costs further decrease the profit generated by suppliers. As they have long found it illogical to calculate contribution to profit from suppliers in a production company, trading companies have long ignored it, as well. The Activity Based Costing (ABC, as the up-to-date system, still does not possess the cost hierarchy for suppliers as the cost object. The aim of the paper is to present a proposal for creating the cost hierarchy for suppliers in a trade company through creating a theoretical financial model as a method. The model also offers a theoretical explanation of how to calculate the contribution from a supplier or a group of suppliers. It is based on empirically evident activities in any supermarket or hypermarket, which makes it possible to create explanatory theoretical research.

  5. 76 FR 80409 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-12-23

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority..., Related to the Operation of Watts Bar Nuclear Plant [WBN], Unit 2--Draft Report for Comment'' (draft SFES.... Stephen J. Campbell, Chief, Watts Bar Special Projects Branch, Division of Operating Reactor Licensing...

  6. Medicare Provider Data - Physician and Other Supplier

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Physician and Other Supplier Public Use File (Physician and Other Supplier PUF) provides information on services and procedures provided to Medicare...

  7. Supplier Directory Data

    Data.gov (United States)

    U.S. Department of Health & Human Services — These are the official datasets used on the Medicare.gov Supplier Directory provided by the Centers for Medicare and Medicaid Services. They provide names,...

  8. Concurrent sourcing and external supplier opportunism

    DEFF Research Database (Denmark)

    Mols, Niels Peter

    costs of opportunism are determined as a product of four factors. The four factors are: likelihood of discovering supplier opportunism, buyer’s internalized quantity as reaction to supplier opportunism, asset specificity of external supplier’s investments, and multiplicator effects. Each......When a firm simultaneously makes and buys the same components then the firm uses concurrent sourcing. This paper presents an agency model for explaining how and when concurrent sourcing reduces the likelihood of external supplier opportunism. In the proposed model, the external supplier’s expected...... of these factors are explained and discussed in the paper. The paper ends by offering a number of theoretical and managerial implications....

  9. Spanish nuclear industry experience in the evaluation of suppliers

    International Nuclear Information System (INIS)

    Ramos Pellejero, J. L.; Martinez, J. A.; Gomez, R.; Pablos, C. de; Herrero, J.

    2012-01-01

    The paper aims to present the experiences identified by the Evaluation Panel Suppliers in fulfilling its role of supplier evaluation of goods and services s afety related . It belongs to UNESA and its main objective the evaluation of the quality system of the supplier against the basic rules applicable. With it you get two main benefits: - standardize evaluation criteria share experiences between suppliers and better management of own resources. - market access to all Spanish nuclear fleet by a single evaluation. From the experience gained, it can be concluded that there is a population of highly technically qualified suppliers to meet equipment requirements.

  10. Factors Contributing to SMEs Failure in Meeting Supplier Performance Standards

    Directory of Open Access Journals (Sweden)

    van Scheers Louise

    2016-01-01

    Full Text Available This study sought to determine the factors that contribute to the failure of small and medium enterprises (SMEs in meeting supplier performance standards. Suppliers are faced with the challenge of SMEs failing to meet supplier performance standards because they rely on these providers of products and services, mainly SMEs, for their operations and to ultimately achieve their mandate. The researchers were able to establish the main factors contributing to SME failure in meeting supplier performance standards. These are as follows: unclear specifications and terms of references from suppliers; insufficient information provided to SME suppliers to ensure understanding of requirements; insufficient feedback and support; no support of SME suppliers based on their Black Economic Empowerment (BEE status; limited or no use of business support programs by SME suppliers; and external factors such as access to finance, changes in the economy, and location.

  11. Learning to Select Supplier Portfolios for Service Supply Chain.

    Science.gov (United States)

    Zhang, Rui; Li, Jingfei; Wu, Shaoyu; Meng, Dabin

    2016-01-01

    The research on service supply chain has attracted more and more focus from both academia and industrial community. In a service supply chain, the selection of supplier portfolio is an important and difficult problem due to the fact that a supplier portfolio may include multiple suppliers from a variety of fields. To address this problem, we propose a novel supplier portfolio selection method based on a well known machine learning approach, i.e., Ranking Neural Network (RankNet). In the proposed method, we regard the problem of supplier portfolio selection as a ranking problem, which integrates a large scale of decision making features into a ranking neural network. Extensive simulation experiments are conducted, which demonstrate the feasibility and effectiveness of the proposed method. The proposed supplier portfolio selection model can be applied in a real corporation easily in the future.

  12. A pragmatic decision model for inventory management with heterogeneous suppliers

    Science.gov (United States)

    Nakandala, Dilupa; Lau, Henry; Zhang, Jingjing; Gunasekaran, Angappa

    2018-05-01

    For enterprises, it is imperative that the trade-off between the cost of inventory and risk implications is managed in the most efficient manner. To explore this, we use the common example of a wholesaler operating in an environment where suppliers demonstrate heterogeneous reliability. The wholesaler has partial orders with dual suppliers and uses lateral transshipments. While supplier reliability is a key concern in inventory management, reliable suppliers are more expensive and investment in strategic approaches that improve supplier performance carries a high cost. Here we consider the operational strategy of dual sourcing with reliable and unreliable suppliers and model the total inventory cost where the likely scenario lead-time of the unreliable suppliers extends beyond the scheduling period. We then develop a Customized Integer Programming Optimization Model to determine the optimum size of partial orders with multiple suppliers. In addition to the objective of total cost optimization, this study takes into account the volatility of the cost associated with the uncertainty of an inventory system.

  13. The '2000-Watt per person'- industrial society - Utopia, vision or necessity?; Die '2000 Watt pro Kopf'-Industriegesellschaft - Utopie, Vision oder Notwendigkeit?

    Energy Technology Data Exchange (ETDEWEB)

    Jochem, E

    2006-07-01

    This short article takes a look at the '2000-Watt per person' concept initially developed at the Swiss Federal Institute of Technology (ETH) in Zurich, Switzerland, in 1998. The author is of the opinion that the concept is not utopian but a vision that can be realised - providing it is accepted socially and that politics can implement it. Further work on the concept done at the ETH over the years is listed and commented on. A diagram provides an overview of energy resources, energy transformation and energy flows to final energy consumption. The question as to if the realisation of such a '2000-Watt'-society is actually necessary is posed.

  14. In Chains? Automotive Suppliers and Their Product Development Activities

    NARCIS (Netherlands)

    F. von Corswant; J.Y.F. Wynstra (Finn); M. Wetzels (Alex)

    2003-01-01

    textabstractA conceptual framework is developed and tested in which supplier downstream position in the supply chain, supplier innovation strategy and customer development commitment are seen as the antecedents of supplier product development activity. Using partial least squares (PLS), we analyze

  15. Packaging supplier inspection guide

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Gregg, R.E.; Kido, C.; Boyle, C.D.

    1991-05-01

    This is document is a guide for conducting quality assurance inspections of transportations packaging suppliers, where suppliers are defined as designers, fabricators, distributors, users, or owners of transportation packaging. This document can be used during an inspection to determine regulatory compliance within the requirements of 10 Code of Federal Regulations, Part 71, Subpart H (10 CFR 71.101--71.135). The guidance described in this document provides a framework for an inspection. It provides the inspector with the flexibility to adapt the methods and concepts presented here to meet the needs of the particular facility being inspected. The guide was developed to ensure a structured and consistent approach for inspections. The method treats each activity at a supplier facility as a separate entity (or functional element), and combines the activities within the framework of an ''inspection tree.'' The method separates each functional element into several areas of performance and then identifies guidelines, based on regulatory requirements, to be used to qualitatively rate each area. This document was developed to serve as a field manual to facilitate the work of inspectors. 1 ref., 1 fig., 5 tabs

  16. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  17. Supplier Selection Using Weighted Utility Additive Method

    Science.gov (United States)

    Karande, Prasad; Chakraborty, Shankar

    2015-10-01

    Supplier selection is a multi-criteria decision-making (MCDM) problem which mainly involves evaluating a number of available suppliers according to a set of common criteria for choosing the best one to meet the organizational needs. For any manufacturing or service organization, selecting the right upstream suppliers is a key success factor that will significantly reduce purchasing cost, increase downstream customer satisfaction and improve competitive ability. The past researchers have attempted to solve the supplier selection problem employing different MCDM techniques which involve active participation of the decision makers in the decision-making process. This paper deals with the application of weighted utility additive (WUTA) method for solving supplier selection problems. The WUTA method, an extension of utility additive approach, is based on ordinal regression and consists of building a piece-wise linear additive decision model from a preference structure using linear programming (LP). It adopts preference disaggregation principle and addresses the decision-making activities through operational models which need implicit preferences in the form of a preorder of reference alternatives or a subset of these alternatives present in the process. The preferential preorder provided by the decision maker is used as a restriction of a LP problem, which has its own objective function, minimization of the sum of the errors associated with the ranking of each alternative. Based on a given reference ranking of alternatives, one or more additive utility functions are derived. Using these utility functions, the weighted utilities for individual criterion values are combined into an overall weighted utility for a given alternative. It is observed that WUTA method, having a sound mathematical background, can provide accurate ranking to the candidate suppliers and choose the best one to fulfill the organizational requirements. Two real time examples are illustrated to prove

  18. Green Suppliers Network Supply Chain Commitment Form

    Science.gov (United States)

    Online form to show your company desires to be a Green Suppliers Network supply chain. Expresses an intent to: commit to engage at least five suppliers to complete an assessment process within a 12-month period and more.

  19. Supplier/customer considerations in corporate financial decisions

    Directory of Open Access Journals (Sweden)

    Jayant R. Kale

    2014-09-01

    Full Text Available Earlier research focussed on firm characteristics and the interests of financial stakeholders (shareholders and bondholders as determinants of corporate policies. Subsequent research recognized that corporate policies are determined in a broader environment that includes nonfinancial stakeholders such as suppliers, customers, labour etc. In this paper, we summarize the theoretical and empirical research that includes supplier/customer considerations in the determination of corporate policies such as capital structure, dividends, takeovers, earnings management, and product quality. We highlight the significant effect that the inclusion of supplier/customer interests has on these corporate policies.

  20. Management of Complex Industrial Supplier Relations - a Case of Customer Attractiveness

    DEFF Research Database (Denmark)

    Ellegaard, Chris

    relationship management is proposed – the concept of Customer Attractiveness. Customer Attractiveness is founded on the revised understanding of the supplier relationship management task and focuses on influencing suppliers by being an attractive customer, hereby motivating the necessary commitment to long......Companies are increasingly relying on suppliers when developing and manufacturing industrial products. Therefore the supplier relationships of the company need to be managed. This dissertation looks at existing theoretical approaches to supplier relationship management. By studying a number...... of supplier relationships of the company Danfoss Drives, an alternative understanding of the supplier relationship management task is proposed. The case study methodology forms the basis for the applied research design. The alternative understanding sees the management task as one of influencing suppliers...

  1. New environmental supplier selection criteria for circular supply chains

    DEFF Research Database (Denmark)

    Prosman, Ernst Johannes; Sacchi, Romain

    2017-01-01

    upon a consequential life cycle assessment and the monetized environmental impact of four alternative fuel suppliers in the cement industry. The best supplier performs three times better than the worst supplier in terms of environmental impact, thereby exemplifying the need for this study. The findings...

  2. Supplier Evaluation Process by Pairwise Comparisons

    Directory of Open Access Journals (Sweden)

    Arkadiusz Kawa

    2015-01-01

    Full Text Available We propose to assess suppliers by using consistency-driven pairwise comparisons for tangible and intangible criteria. The tangible criteria are simpler to compare (e.g., the price of a service is lower than that of another service with identical characteristics. Intangible criteria are more difficult to assess. The proposed model combines assessments of both types of criteria. The main contribution of this paper is the presentation of an extension framework for the selection of suppliers in a procurement process. The final weights are computed from relative pairwise comparisons. For the needs of the paper, surveys were conducted among Polish managers dealing with cooperation with suppliers in their enterprises. The Polish practice and restricted bidding are discussed, too.

  3. An integrated MCDM approach to green supplier selection

    Directory of Open Access Journals (Sweden)

    Morteza Yazdani

    2014-06-01

    Full Text Available Supplier selection management has been considered as an important subject for industrial organizations. In order to remain on the market, to gain profitability and to retain competitive advantage, business units need to establish an integrated and structured supplier selection system. In addition, environmental protection problems have been big solicitudes for organizations to consider green approach in supplier selection problem. However, finding proper suppliers involves several variables and it is critically a complex process. In this paper, the main attention is focused on finding the right supplier based on fuzzy multi criteria decision making (MCDM process. The weights of criteria are calculated by analytical hierarchical process (AHP and the final ranking is achieved by fuzzy technique for order preference by similarity to an ideal solution (TOPSIS. TOPSIS advantage among the other similar methods is to obtain the best solution close to ideal solution. The paper attempts to express better understanding by an example of an automobile manufacturing supply chain.

  4. Low Carbon Supplier Selection in the Hotel Industry

    Directory of Open Access Journals (Sweden)

    Chia-Wei Hsu

    2014-05-01

    Full Text Available This study presents a model for evaluating the carbon and energy management performance of suppliers by using multiple-criteria decision-making (MCDM. By conducting a literature review and gathering expert opinions, 10 criteria on carbon and energy performance were identified to evaluate low carbon suppliers using the Fuzzy Delphi Method (FDM. Subsequently, the decision-making trial and evaluation laboratory (DEMATEL method was used to determine the importance of evaluation criteria in selecting suppliers and the causal relationships between them. The DEMATEL-based analytic network process (DANP and VlseKriterijumska Optimizacija I Kompromisno Resenje (VIKOR were adopted to evaluate the weights and performances of suppliers and to obtain a solution under each evaluation criterion. An illustrative example of a hotel company was presented to demonstrate how to select a low carbon supplier according to carbon and energy management. The proposed hybrid model can help firms become effective in facilitating low carbon supply chains in hotels.

  5. Using MACBETH method for supplier selection in manufacturing environment

    Directory of Open Access Journals (Sweden)

    Prasad Karande

    2013-04-01

    Full Text Available Supplier selection is always found to be a complex decision-making problem in manufacturing environment. The presence of several independent and conflicting evaluation criteria, either qualitative or quantitative, makes the supplier selection problem a candidate to be solved by multi-criteria decision-making (MCDM methods. Even several MCDM methods have already been proposed for solving the supplier selection problems, the need for an efficient method that can deal with qualitative judgments related to supplier selection still persists. In this paper, the applicability and usefulness of measuring attractiveness by a categorical-based evaluation technique (MACBETH is demonstrated to act as a decision support tool while solving two real time supplier selection problems having qualitative performance measures. The ability of MACBETH method to quantify the qualitative performance measures helps to provide a numerical judgment scale for ranking the alternative suppliers and selecting the best one. The results obtained from MACBETH method exactly corroborate with those derived by the past researchers employing different mathematical approaches.

  6. Multi criteria decision making approaches for green supplier evaluation and selection

    DEFF Research Database (Denmark)

    Govindan, Kannan; Rajendran, S.; Sarkis, J.

    2015-01-01

    A large and growing body of literature to supplier evaluation and selection exists. Literature on green supplier evaluation that considers environmental factors are relatively limited. Recently, in supply chain management decision making, approaches for evaluating green supplier performance have ...... us to identify improvements for green supplier selection process and possible future directions.......A large and growing body of literature to supplier evaluation and selection exists. Literature on green supplier evaluation that considers environmental factors are relatively limited. Recently, in supply chain management decision making, approaches for evaluating green supplier performance have...... used both qualitative and quantitative environmental data. Given this evolving research field, the goal and purpose of this paper is to analyze research in international scientific journals and international conference proceedings that focus on green supplier selection. We propose the following...

  7. Supplier Performance Evaluation and Rating System (SPEARS)

    International Nuclear Information System (INIS)

    Oged, M.; Warner, D.; Gurbuz, E.

    1993-03-01

    The SSCL Magnet Quality Assurance Department has implemented a Supplier Performance Evaluation and Rating System (SPEARS) to assess supplier performance throughout the development and production stages of the SSCL program. The main objectives of SPEARS are to promote teamwork and recognize performance. This paper examines the current implementation of SPEARS. MSD QA supports the development and production of SSCsuperconducting magnets while implementing the requirements of DOE Order 5700.6C. The MSD QA program is based on the concept of continuous improvement in quality and productivity. The QA program requires that procurement of items and services be controlled to assure conformance to specification. SPEARS has been implemented to meet DOE requirements and to enhance overall confidence in supplier performance. Key elements of SPEARS include supplier evaluation and selection as well as evaluation of furnished quality through source inspection, audit, and receipt inspection. These elements are described in this paper

  8. Prospects for UK fuel cells component suppliers

    Energy Technology Data Exchange (ETDEWEB)

    Wilcox, C.; Tunnicliffe, M.

    2002-07-01

    This report examines the capabilities of the UK fuel cell industry in meeting the expected increase in demand, and aims to identify all UK suppliers of fuel cell components, evaluate their products and match them to fuel cell markets, and identify components where the UK is in a competitive position. Component areas are addressed along with the need to reduce costs and ensure efficient production. The well established supplier base in the UK is noted, and the car engine manufacturing base and fuel supply companies are considered. The different strengths of UK suppliers of the various types of fuel cells are listed. The future industry structure, the opportunities and dangers for business posed by fuel cells, the investment in cleaner technologies by the large fuel companies, opportunities for catalyst suppliers, and the residential combined heat and power and portable electronics battery markets are discussed.

  9. Supplier Performance Evaluation and Rating System (SPEARS)

    International Nuclear Information System (INIS)

    Oged, M.; Warner, D.G.; Gurbuz, E.

    1994-01-01

    The SSCL Magnet Quality Assurance Department has implemented a Supplier Performance Evaluation and Rating System (SPEARS) to assess supplier performance throughout the development and production stages of the SSCL program. The main objectives of SPEARS are to promote teamwork and recognize performance. This paper examines the current implementation of SPEARS. MSD QA supports the development and production of SSC superconducting magnets while implementing the requirements of DOE Order 5700.6C. The MSD QA program is based on the concept of continuous improvement in quality and productivity. The QA program requires that procurement of items and services be controlled to assure conformance to specification. SPEARS has been implemented to meet DOE requirements and to enhance overall confidence in supplier performance. Key elements of SPEARS include supplier evaluation and selection as well as evaluation of furnished quality through source inspection, audit, and receipt inspection. These elements are described in this paper

  10. The '2000-Watt per person'- industrial society - Utopia, vision or necessity?

    International Nuclear Information System (INIS)

    Jochem, E.

    2006-01-01

    This short article takes a look at the '2000-Watt per person' concept initially developed at the Swiss Federal Institute of Technology (ETH) in Zurich, Switzerland, in 1998. The author is of the opinion that the concept is not utopian but a vision that can be realised - providing it is accepted socially and that politics can implement it. Further work on the concept done at the ETH over the years is listed and commented on. A diagram provides an overview of energy resources, energy transformation and energy flows to final energy consumption. The question as to if the realisation of such a '2000-Watt'-society is actually necessary is posed

  11. Integrated model for supplier selection and performance evaluation

    Directory of Open Access Journals (Sweden)

    Borges de Araújo, Maria Creuza

    2015-08-01

    Full Text Available This paper puts forward a model for selecting suppliers and evaluating the performance of those already working with a company. A simulation was conducted in a food industry. This sector has high significance in the economy of Brazil. The model enables the phases of selecting and evaluating suppliers to be integrated. This is important so that a company can have partnerships with suppliers who are able to meet their needs. Additionally, a group method is used to enable managers who will be affected by this decision to take part in the selection stage. Finally, the classes resulting from the performance evaluation are shown to support the contractor in choosing the most appropriate relationship with its suppliers.

  12. Aluminium supplier selection for the automotive parts manufacturer

    Directory of Open Access Journals (Sweden)

    M. Cieśla

    2016-04-01

    Full Text Available This paper presents a methodology for selection of the optimal sources of supply, which is also known as the problem of supplier selection. Theoretical considerations are expanded with research related to aluminium supplier selection for a hypothetical manufacturer of aluminium parts for transportation equipment located in Poland. Evaluation of five suppliers of aluminium from Poland, Germany and Slovenia has been conducted using a weighted scoring method, a strengths and weaknesses method and a graphical method. Choosing the best offer and prioritizing suppliers allows not only the most rational decision in the field of supply logistics to be taken but also the quality of service in the metallurgical industry to be improved.

  13. The policies of supplier nations

    International Nuclear Information System (INIS)

    Moher, M.J.

    1987-01-01

    This chapter is concerned with the nuclear non-proliferation element of the policies of supplier nations. These policies include economic, commercial, resource management, financial and technological aspects. The evolution of the nuclear export policies of supplier nations is considered. The challenges facing the non-proliferation regime are looked at. Finally, the progress made is reviewed. Although this has been considerable, further work is necessary and this is mentioned. The postscript assesses the situation following the successful Third NPT Review Conference held in 1985. (U.K.)

  14. Consequences of information technology usage on retailer-supplier relations

    DEFF Research Database (Denmark)

    Esbjerg, Lars

    1. Retailers and suppliers increasingly tend to form long-term co-operative relationships. In the literature, the use of information technology is an enabling factor behind this trend. Nevertheless, our understanding of how information technology influences retailer-supplier relationships is still...... limited. The purpose of this paper therefore is to study the consequences of information technology usage on retailer supplier relationships, focusing on inter-organisational systems. 2. The paper begins by discussing the nature of retailer-supplier relations, noting that whereas these relationships have...... traditionally been adversarial, retailers and suppliers are beginning to realise that they can benefit from co-operating. Further, developmental processes in co-operative inter-organisational relations are discussed and the important role of social exchange in inter-organisational relationships is stressed. 3...

  15. Supplier Development Literature Review and Key Future Research Areas

    Directory of Open Access Journals (Sweden)

    Muddassir Ahmed

    2012-10-01

    Full Text Available The purpose of this paper is to develop a Supplier Development (SD literature framework and identify the main focus areas in SD research. To this end, a comprehensive review of the existing SD academic literature has been undertaken, which includes 62 research papers. These papers are classified according to their research content and the research methodology employed. A comprehensive list of future research areas is also presented. Thus, this paper will also briefly explore proposed future research. The review of the SD literature presented here identifies the following main areas of focus: Supplier Development Activities, Practices and Success Factors; Direct or Indirect Supplier Development; Supplier Development as a Reactive or Strategic Process; Supplier Development in a Lean Six Sigma & SME context.

  16. An examination of hospital satisfaction with blood suppliers.

    Science.gov (United States)

    Carden, Robert; DelliFraine, Jami L

    2004-11-01

    The purpose of this study was to identify factors that predict overall hospital satisfaction with blood suppliers. The data for this study came from a 2001 satisfaction survey of hospital blood bank managers conducted by the National Blood Data Resource Center. A total of 1325 blood-utilizing hospitals were included in the final study database. The measurement of hospital satisfaction with its blood supplier encompasses the five composites of the SERVQUAL model. The five composites are 1) tangibles, 2) reliability, 3) responsiveness, 4) assurance, and 5) empathy. Linear regression was performed with overall hospital satisfaction as the dependent variable and the five composites of the SERVQUAL model and control variables as predictors of overall hospital satisfaction with blood suppliers. Significant predictors of hospital satisfaction with blood suppliers are satisfaction with medical and clinical support provided by the blood center, satisfaction with the routine delivery schedule, and price (service fee) of red cells. Prior studies have demonstrated the importance of customer satisfaction to organizations. As organizations, blood centers can benefit from improved satisfaction from their hospital customers. Blood center strategies that focus on improving these three predictors of overall hospital satisfaction with primary blood suppliers will be the most likely to improve and/or maintain hospital customer satisfaction with primary blood suppliers.

  17. The value to blood establishments of supplier quality audit and of adopting a European Blood Alliance collaborative approach

    Science.gov (United States)

    Nightingale, Mark J.; Ceulemans, Jan; Ágoston, Stephanie; van Mourik, Peter; Marcou-Cherdel, Céline; Wickens, Betty; Johnstone, Pauline

    2014-01-01

    Background The assessment of suppliers of critical goods and services to European blood establishments is a regulatory requirement proving difficult to resource. This study was to establish whether European Blood Alliance member blood services could collaborate to reduce the cost of auditing suppliers without diminishing standards. Materials and method Five blood services took part, each contributing a maximum of one qualified auditor per audit (rather than the usual two). Four audits were completed involving eight auditors in total to a European Blood Alliance agreed policy and process using an audit scope agreed with suppliers. Results Audits produced a total of 22 observations, the majority relating to good manufacturing practice and highlighted deficiencies in processes, procedures and quality records including complaints’ handling, product recall, equipment calibration, management of change, facilities’ maintenance and monitoring and business continuity. Auditors reported that audits had been useful to their service and all audits prompted a positive response from suppliers with satisfactory corrective action plans where applicable. Audit costs totalled € 3,438 (average € 860 per audit) which is no more than equivalent traditional audits. The four audit reports have been shared amongst the five participating blood establishments and benefitted 13 recipient departments in total. Previously, 13 separate audits would have been required by the five blood services. Discussion Collaborative supplier audit has proven an effective and efficient initiative that can reduce the resource requirements of both suppliers and individual blood service’s auditing costs. Collaborative supplier audit has since been established within routine European Blood Alliance management practice. PMID:24553596

  18. A new Russell model for selecting suppliers

    NARCIS (Netherlands)

    Azadi, Majid; Shabani, Amir; Farzipoor Saen, Reza

    2014-01-01

    Recently, supply chain management (SCM) has been considered by many researchers. Supplier evaluation and selection plays a significant role in establishing an effective SCM. One of the techniques that can be used for selecting suppliers is data envelopment analysis (DEA). In some situations, to

  19. Supplier Selection based on the Performance by using PROMETHEE Method

    Science.gov (United States)

    Sinaga, T. S.; Siregar, K.

    2017-03-01

    Generally, companies faced problem to identify vendors that can provide excellent service in availability raw material and on time delivery. The performance of suppliers in a company have to be monitored to ensure the availability to fulfill the company needs. This research is intended to explain how to assess suppliers to improve manufacturing performance. The criteria that considered in evaluating suppliers is criteria of Dickson. There are four main criteria which further split into seven sub-criteria, namely compliance with accuracy, consistency, on-time delivery, right quantity order, flexibility and negotiation, timely of order confirmation, and responsiveness. This research uses PROMETHEE methodology in assessing the supplier performances and obtaining a selected supplier as the best one that shown from the degree of alternative comparison preference between suppliers.

  20. New Approaches of Supplier Relationship Management

    OpenAIRE

    Cârstea Gheorghe; Pãun Oana; Pãun Sorin

    2014-01-01

    In a strong competitive environment, based on an increased degree of risk and uncertainty, supplier relationship management is considered to be a strategic value-adding process, able to contribute to the success of the organization. Supplier relationship management must also the development of a collaborative environment, based on trust between partners, so that both parties can achieve mutually beneficial objectives through joint effort and time investment.

  1. A new DEA-GAHP method for supplier selection problem

    Directory of Open Access Journals (Sweden)

    Behrooz Ahadian

    2012-10-01

    Full Text Available Supplier selection is one of the most important decisions made in supply chain management. Supplier evaluation problem has been in the center of supply chain researcher’s attention in these years. Managers regard some of these studies and methods inappropriate due to simple, weight scoring methods that generally are based on subjective opinions and judgments of decision maker units involved in the supplier evaluation process yielding imprecise and even unreliable results. This paper seeks to propose a methodology to integrate data envelopment analysis (DEA and group analytical hierarchy process (GAHP for evaluating and selecting the most efficient supplier. We develop a methodology, which consists of 6 steps, one by one has been introduced in lecture and finally applicability of proposed method is indicated by assessing 12 suppliers in a numerical example.

  2. Drivers of supplier-customer relationship profitability in China

    DEFF Research Database (Denmark)

    Dawson, Bonnie; Young, Louise; Murray, John M.

    2017-01-01

    has implications for the ongoing management of international supplier-customer relationships, Chinese government policy with regard to SOEs as well as the inclusion of organization types as a consideration for business marketing relationship and value creation theory.......Business relationship performance depends on the context(s) in which the relationship is being conducted, including the cultural context and the nature of the organizations participating in them. Here, we examine the drivers of performance in Chinese supplier-customer relationships for two types...... of Chinese suppliers - International Joint Ventures (IJVs) and State Owned Enterprises (SOEs). The results indicate there are marked differences in the links between relationship drivers and perceived relationship profitability for these different types of suppliers. The profitability of SOEs' customer...

  3. Performance Measurement Model for the Supplier Selection Based on AHP

    Directory of Open Access Journals (Sweden)

    Fabio De Felice

    2015-10-01

    Full Text Available The performance of the supplier is a crucial factor for the success or failure of any company. Rational and effective decision making in terms of the supplier selection process can help the organization to optimize cost and quality functions. The nature of supplier selection processes is generally complex, especially when the company has a large variety of products and vendors. Over the years, several solutions and methods have emerged for addressing the supplier selection problem (SSP. Experience and studies have shown that there is no best way for evaluating and selecting a specific supplier process, but that it varies from one organization to another. The aim of this research is to demonstrate how a multiple attribute decision making approach can be effectively applied for the supplier selection process.

  4. Preferred supplier contracts in post-patent prescription drug markets.

    Science.gov (United States)

    Blankart, Carl Rudolf; Stargardt, Tom

    2016-02-22

    In recent years, the expiration of patents for large drug classes has increased the importance of post-patent drug markets. However, previous research has focused solely on patent drug markets. In this study, the authors evaluate the influence of preferred supplier contracts, the German approach to tendering, in post-patent drug markets using a hierarchical market share attraction model. The authors find that preferred supplier contracts are a powerful strategic instrument for generic manufacturers in a highly competitive environment. They quantify the effects of signing a preferred supplier contract and show that brand-name manufacturers are vulnerable to tendering. Therefore, brand-name manufacturers should readjust their strategies and consider including preferred supplier contracts in their marketing mix. In addition, the authors employ a simulation to demonstrate that a first-mover advantage might be gained from signing a preferred supplier contract. Furthermore, their results can be used as a blueprint for decision makers in the pharmaceutical industry to assess the market share effects of different contracting strategies regarding preferred supplier contracts.

  5. Supplier Portfolio Selection and Optimum Volume Allocation: A Knowledge Based Method

    NARCIS (Netherlands)

    Aziz, Romana; Aziz, R.; van Hillegersberg, Jos; Kersten, W.; Blecker, T.; Luthje, C.

    2010-01-01

    Selection of suppliers and allocation of optimum volumes to suppliers is a strategic business decision. This paper presents a decision support method for supplier selection and the optimal allocation of volumes in a supplier portfolio. The requirements for the method were gathered during a case

  6. The wicked problems of supplier-driven innovation

    DEFF Research Database (Denmark)

    Christensen, Poul Rind; Munksgaard, Kristin Balslev; Bang, Anne Louise

    2017-01-01

    Suppliers stand in the wake of a new diversified strategic momentum in the global production network, where innovation is growing in importance. The term “supplier-driven innovation” is coined in contrast to the current hype on user-driven innovation; this paper aims to discuss the wicked problems...

  7. LHC suppliers win Golden Hadron awards

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    In a ceremony on 30 July, three of the 200 suppliers for the Large Hadron Collider (LHC) were presented with Golden Hadron awards. It is the third year that the awards have been presented to suppliers, not only for their technical and financial achievements but also for their compliance with contractual deadlines. This year the three companies are all involved in the supplies for the LHC's main magnet system.

  8. A simplified, result oriented supplier performance management system testing framework for SME

    Directory of Open Access Journals (Sweden)

    Satya Parkash Kaushik

    2014-06-01

    Full Text Available Background: Supplier performance management continues to be a significant concern for small & medium enterprises (SME. How can small & medium enterprises better position themselves to check and sustain actual supplier performance improvement? A key framework is the establishment of a value-added supplier performance audit program that places significant emphasis on supplier performance controls. A value-added supplier audit program can help SME mitigate business and regulatory risk while reducing the cost of poor quality (COPQ. Thus a good supplier performance audit program is the cornerstone of supplier performance management integrity. Methods: By acknowledging and addressing the challenges to an effective supplier Performance Audit program, this paper proposes an objective framework of supplier performance audit program, built on a strong, yet versatile statistical methodology - Analysis of variance (ANOVA. This performance audit framework considers process definition, standardization, review of the contemporary literature on ANOVA & its practical application in supplier performance scorecard of one of the reputed Sports Goods Industry in India. Results and conclusions: The advantages of this framework are that: it simultaneously considers multiple supplier performance in multiple time frames and effectively identifies the differences across the suppliers in terms of their performance. Through this framework the organization will be able to increase the odds of performing a predictable and successful implementation of a value-added supplier performance audit.

  9. Intermediate steps towards the 2000-Watt society in Switzerland: an energy-economic scenario analysis[Dissertation 17314

    Energy Technology Data Exchange (ETDEWEB)

    Schulz, T. F

    2007-07-01

    In this dissertation by Thorsten Frank Schulz the intermediate steps necessary to realise the 2000-Watt Society in Switzerland are examined. An analysis of an energy-economic scenario shows that the 2000-Watt Society should be seen as a long-term goal. According to the author, the major changes required to allow the implementation of this project concern energy-transformation and energy-demand technologies. Electricity will, according to the author, play an important role in a service-oriented society in the future. In such a transformation even intermediate steps are associated with considerable expense. The aims of the 2000-Watt Society project are listed. Energy and CO{sub 2} balances for the domestic and transport sectors are presented and discussed. Complementary analyses are presented concerning fuel cells and wood-based fuel technologies. Finally, the implications of the 2000-Watt society and the effects of technological change are summarised and an outlook is presented.

  10. Sandia National Laboratories: Working with Sandia: Current Suppliers

    Science.gov (United States)

    Defense Systems & Assessments About Defense Systems & Assessments Program Areas Accomplishments Audit Sandia's Economic Impact Licensing & Technology Transfer Browse Technology Portfolios Suppliers iSupplier Account Accounts Payable Contract Information Construction and Facilities Contract Audit

  11. Random walk in degree space and the time-dependent Watts-Strogatz model

    Science.gov (United States)

    Casa Grande, H. L.; Cotacallapa, M.; Hase, M. O.

    2017-01-01

    In this work, we propose a scheme that provides an analytical estimate for the time-dependent degree distribution of some networks. This scheme maps the problem into a random walk in degree space, and then we choose the paths that are responsible for the dominant contributions. The method is illustrated on the dynamical versions of the Erdős-Rényi and Watts-Strogatz graphs, which were introduced as static models in the original formulation. We have succeeded in obtaining an analytical form for the dynamics Watts-Strogatz model, which is asymptotically exact for some regimes.

  12. The emerging nuclear suppliers: some guidelines for policy (U)

    Energy Technology Data Exchange (ETDEWEB)

    Dunn, Lewis A.

    1988-04-01

    Lewis A. Dunn, a former Assistant Director of the US Arms Control and Disarmament Agency and now a senior analyst with Science Applications International Corporation, looks to the future to offer "The Emerging Nuclear Suppliers: Some Guidelines for Policy ." Mr. Dunn notes that although most emerging suppliers are cautious, many are not party to existing nonproliferation treaties. He calls upon the nonproliferation community to continue the present policy of not supporting unsafeguarded nuclear activities. He suggests that the nonproliferation community work within existing standards and infrastructures of nuclear suppliers to convince emerging supplier nations of the merits of nuclear export control.

  13. Supplier's evaluation - internal and external audits and surveillance

    International Nuclear Information System (INIS)

    Fowler, J.L.; Derrick, R.

    1976-01-01

    The quality programme for SGHWR type reactors places responsibility upon all purchasers to evaluate potential suppliers' quality systems and to conduct audits and surveillance on the implementation of suppliers' quality assurance programmes during contract performance. This will be carried out in accordance with the requirements of Central Electricity Board standard QA42. It also places a responsibilty on every supplier to conduct in-house audits and surveillance of the effectiveness of his own quality assurance programmes. These procedures are discussed. (U.K.)

  14. Optimal Management of Supply Disruptions when Contracting with Unreliable, Risk-averse, Suppliers

    OpenAIRE

    Parlane, Sarah; Tsai, Ying-Yi

    2017-01-01

    This paper investigates the optimal management of supply disruptions by a manufacturer who uses order inflation and/or investments in process reliability when contracting two risk-averse suppliers. We consider that these investments can be subject to moral hazard. Technically we solve a newsvendor optimization problem using a random capacity model of disruption. In such a model, the order size does not affect the average production but impacts the probability of disruption. When investments a...

  15. Managing nuclear supplier risks

    International Nuclear Information System (INIS)

    Ramberg, B.

    1990-01-01

    This paper reports that with the appearance of such third-tier suppliers as Argentina, Brazil, South Korea, Taiwan, China, and others capable of producing nuclear components and sensitive nuclear materials, assurance that importers are using nuclear energy benignly and safely may become more uncertain. It is therefore important to integrate emerging exporters and importers into a regime of norms designed to minimize nuclear risks. The experience of the London Nuclear Suppliers Group (NSG) to arrive at a code of conduct is encouraging. Placed in the context of the larger evolving nuclear energy regime that seeks to address nuclear safety, proliferation, terrorism, and military attacks on reactors, the international community has made substantial progress. Still, there is much that remains to be done

  16. The emerging nuclear suppliers and nonproliferation

    International Nuclear Information System (INIS)

    Potter, W.C.

    1990-01-01

    The number of states capable of exporting nuclear material, technology, equipment, and services is large and growing. Once confined primarily to states party to the Nuclear Non-Proliferation Treaty (NPT), the list of actual and potential nuclear suppliers now includes many countries that do not subscribe to the NPT or to other international nuclear export control agreements. Although international control accords---such as the Nuclear Exporters' (Zangger) Committee and the London Nuclear Suppliers Group (NSG) guidelines---do not prohibit the export of sensitive nuclear materials and equipment, they do reduce the risks of proliferation by imposing international safeguards as a condition for export. The purpose of this book---the culmination of one phase of an ongoing international research project on the emerging nuclear suppliers and nonproliferation---is to remedy, at least in part, this data deficiency

  17. AHP approach for supplier evaluation and selection in a steel manufacturing company

    Directory of Open Access Journals (Sweden)

    Farzad Tahriri

    2008-12-01

    Full Text Available Supplier selection is one of the most critical activities of purchasing management in supply chain. Supplier selection is a complex problem involving qualitative and quantitative multi-criteria. A trade-off between these tangible and intangible factors is essential in selecting the best supplier. The work incorporates AHP in choosing the best suppliers. The results suggest that AHP process makes it possible to introduce the optimum order quantities among the selected suppliers so that the Total Value of Purchasing (TVP becomes maximum. In this work, an AHP-based supplier selection model is formulated and then applied to a real case study for a steel manufacturing company in Malaysia. The use of the proposed model indicates that it can be applied to improve and assist decision making to resolve the supplier selection problem in choosing the optimal supplier combination. The work represents the systematic identification of the important criteria for supplier selection process. In addition, the results exhibit the application of development of a multi-criteria decision model for evaluation and selection of suppliers with proposed AHP model, which by scoring the performance of suppliers is able to reduce the time taken to select a vendor.

  18. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  19. Examining the Modes Malware Suppliers Use to Provide Goods and Services

    Directory of Open Access Journals (Sweden)

    Tony Bailetti

    2016-02-01

    Full Text Available Malware suppliers use various modes to provide goods and services to customers. By mode, we mean “the way” the malware supplier chooses to function. These modes increase monetization opportunities and enable many security breaches worldwide. A theoretically sound framework that can be used to examine the various modes that malware suppliers use to produce and sell malware is needed. We apply a general model specified recently by Hagiu and Wright to study five modes that malware suppliers use to deliver goods and services to their customers. The framework presented in this article can be used to predict the mode in which a malware supplier will function; to study which types of malware suppliers, agents, and customers are attracted to each mode; to discover new modes; and to better understand the threat a malware supplier presents.

  20. Cooperative Evolutionary Game and Applications in Construction Supplier Tendency

    Directory of Open Access Journals (Sweden)

    Qianqian Shi

    2018-01-01

    Full Text Available Major construction projects have a great influence on the national economy and society, wherein cooperative relationship between construction suppliers plays an increasingly significant role in the overall supply chain system. However, the relationships between suppliers are noncontractual, multistage, dynamic, and complicated. To gain a deeper insight into the suppliers’ cooperative relationships, an evolutionary game model is developed to explore the cooperation tendency of multisuppliers. A replicator dynamic system is further formulated to investigate the evolutionary stable strategies of multisuppliers. Then, fourteen “when-then” type scenarios are concluded and classified into six different evolutionary tracks. Meanwhile, the critical influencing factors are identified. The results show that the suppliers’ production capacity, owner-supplier contract, and the owner’s incentive mechanism influence the cooperation tendency of suppliers directly. The managerial implications contribute to insightful references for a more stable cooperative relationship between the owner and suppliers.

  1. CERN recognises LHC suppliers

    CERN Multimedia

    2002-01-01

    CERN has just presented the first awards recognising LHC suppliers. The Russian institute BINP, the Belgian firm Cockerill-Sambre and the US company Wah-Chang are the recipients of the first 'Golden Hadrons'.

  2. Supplier selection for a tire company with AHP and PROMETHEE methods

    Directory of Open Access Journals (Sweden)

    Atakan ALKAN

    2017-04-01

    Full Text Available Supplier selection is very important for a company to be successful in a globalized competitive environment. The aims at choosing the optimal supplier; to increase customer satisfaction, improve the competitive ability and continue to exist at minimal cost. This study was intended to choose the most suitable raw material supplier in a company engaged in the production of agricultural tires. In the study Analytical Hierarchy Process (AHP and Promethee I-II methods were applied in order to select the most optimal supplier to a company. In conclusion, AHP and Promethee I-II methods used by the company to determine the suppliers with the optimal supplier and brought several recommendations.

  3. Sustainable Supplier Performance Evaluation and Selection with Neofuzzy TOPSIS Method.

    Science.gov (United States)

    Chaharsooghi, S K; Ashrafi, Mehdi

    2014-01-01

    Supplier selection plays an important role in the supply chain management and traditional criteria such as price, quality, and flexibility are considered for supplier performance evaluation in researches. In recent years sustainability has received more attention in the supply chain management literature with triple bottom line (TBL) describing the sustainability in supply chain management with social, environmental, and economic initiatives. This paper explores sustainability in supply chain management and examines the problem of identifying a new model for supplier selection based on extended model of TBL approach in supply chain by presenting fuzzy multicriteria method. Linguistic values of experts' subjective preferences are expressed with fuzzy numbers and Neofuzzy TOPSIS is proposed for finding the best solution of supplier selection problem. Numerical results show that the proposed model is efficient for integrating sustainability in supplier selection problem. The importance of using complimentary aspects of sustainability and Neofuzzy TOPSIS concept in sustainable supplier selection process is shown with sensitivity analysis.

  4. Coulomb explosion of methyl iodide clusters using giga watt laser ...

    Indian Academy of Sciences (India)

    Administrator

    ... using giga watt laser pulses in the visible region: Effect of wavelength, polarisation and .... is governed by the product of ponderomotive energy and the total effec- .... gesting isotropic disintegration of multiply charged. CH3I cluster. It must be ...

  5. Noisy probability judgment, the conjunction fallacy, and rationality: Comment on Costello and Watts (2014).

    Science.gov (United States)

    Crupi, Vincenzo; Tentori, Katya

    2016-01-01

    According to Costello and Watts (2014), probability theory can account for key findings in human judgment research provided that random noise is embedded in the model. We concur with a number of Costello and Watts's remarks, but challenge the empirical adequacy of their model in one of their key illustrations (the conjunction fallacy) on the basis of recent experimental findings. We also discuss how our argument bears on heuristic and rational thinking. (c) 2015 APA, all rights reserved).

  6. An Integrated DEMATEL-QFD Model for Medical Supplier Selection

    OpenAIRE

    Mehtap Dursun; Zeynep Şener

    2014-01-01

    Supplier selection is considered as one of the most critical issues encountered by operations and purchasing managers to sharpen the company’s competitive advantage. In this paper, a novel fuzzy multi-criteria group decision making approach integrating quality function deployment (QFD) and decision making trial and evaluation laboratory (DEMATEL) method is proposed for supplier selection. The proposed methodology enables to consider the impacts of inner dependence among supplier assessment cr...

  7. Determinants of supplier-buyer relationship competitiveness in transnational companies

    Directory of Open Access Journals (Sweden)

    Matevž Rašković

    2013-03-01

    Full Text Available Effective supplier-buyer relationship management should not be seen only in terms of cost and financial measures, as outlined by Transaction cost economics, but also in terms of other (“softer” relational benefits, like e.g. more comprehensive information sharing, higher levels of trust, better cooperation and increased relationship flexibility. This second view is grounded in both Relationship marketing and Resource-advantage theory. Surprisingly, only a few research papers on supplier-buyer relationships address both of these perspectives equally, as well as in terms of long-term competitiveness (vis-avis a traditional short-term performance. The purpose of this paper is to analyze business relationship determinants of supplier-buyer relationship competitiveness, where we study the impact of (1 relationship-based information exchange, (2 network spillover effects, (3 transaction-specific investments, (4 trust, (5 cooperation (joint actions and (6 flexibility on perceived (7 supplier-buyer relationship competitiveness. In this regard the main research question of our study is: Which relational and transactional dimensions determine supplier-buyer relationship competitiveness, as well as how strongly? To provide the answer this research question we employ an exploratory-type Partial Least Squares (PLS regression in conjunction with a novel perspective of network spillover effects, as a set of independent variables in our model. The data set consists of a sample of 130 international suppliers (approx. 30 % response rate connected to a transnational company (TNC headquartered in Slovenia, which operates in the steel construction solutions’ industry. Our results clearly identify a relational and a transactional set of determinants of supplier-buyer relationship competitiveness, with the former having a significantly higher impact on competitiveness than the latter. With regards to specific dimensions associated with this relational component

  8. Supplier selection criteria for sustainable supply chain management in thermal power plant

    Science.gov (United States)

    Firoz, Faisal; Narayan Biswal, Jitendra; Satapathy, Suchismita

    2018-02-01

    Supplies are always in great demand when it comes to industrial operations. The quality of raw material their price accompanied by sustainability and environmental effects are a major concern for industrial operators these days. Supply Chain Management is the subject which is focused on how the supply of different products is carried out. The motive is that each operation performed can be optimized and inherently the efficiency of the whole chain is integrated. In this paper we will be dealing with all the criteria that are required to be evaluated before selecting a supplier, in particular, focusing on Thermal Power Plant. The most suppliers of the thermal power plant are the coal suppliers. The quality of coal directly determines the efficiency of the whole plant. And when there are matters concerning coal environmental pollution plays a very crucial role. ANP method has been used here to select suppliers of thermal power sectors in Indian context. After applying ANP to prioritize the sustainable supplier selection criteria, it is found that for thermal power industries best suppliers are Nationalized/State owned suppliers then 2nd ranked suppliers are imported supplier. Private owned suppliers are ranked least. So private owned suppliers must be more concerned about their performance. Among these suppliers it is found that to compete in the global market privatized suppliers have to give more emphasize on most important criteria like sustainability, then fuel cost and quality. Still some sub-criteria like a clean program, environmental issues, quality, reliability, service rate, investment in high technology, green transportation channel, waste management etc needs for continuous improvement as per their priority.

  9. 500 Watt Diesel Fueled TPV Portable Power Supply

    Science.gov (United States)

    Horne, W. E.; Morgan, M. D.; Sundaram, V. S.; Butcher, T.

    2003-01-01

    A test-bed 500 watt diesel fueled thermophotovoltaic (TPV) portable power supply is described. The goal of the design is a compact, rugged field portable unit weighing less than 15 pounds without fuel. The conversion efficiency goal is set at 15% fuel energy to electric energy delivered to an external load at 24 volts. A burner/recuperator system has been developed to meet the objectives of high combustion air preheat temperatures with a compact heat exchanger, low excess air operation, and high convective heat transfer rates to the silicon carbide emitter surface. The burner incorporates a air blast atomizer with 100% of the combustion air passing through the nozzle. Designed firing rate of 2900 watts at 0.07 gallons of oil per hour. This incorporates a single air supply dc motor/fan set and avoids the need for a system air compressor. The recuperator consists of three annular, concentric laminar flow passages. Heat from the combustion of the diesel fuel is both radiantly and convectively coupled to the inside wall of a cylindrical silicon carbide emitter. The outer wall of the emitter then radiates blackbody energy at the design temperature of 1400°C. The cylindrical emitter is enclosed in a quartz envelope that separates it from the photovoltaic (PV) cells. Spectral control is accomplished by a resonant mesh IR band-pass filter placed between the emitter and the PV array. The narrow band of energy transmitted by the filter is intercepted and converted to electricity by an array of GaSb PV cells. The array consists of 216 1-cm × 1-cm GaSb cells arranged into series and parallel arrays. An array of heat pipes couple the PV cell arrays to a heat exchanger which is cooled by forced air convection. A brief status of the key TPV technologies is presented followed by data characterizing the performance of the 500 watt TPV system.

  10. Supplier Assessment and Selection Using Fuzzy Analytic Hierarchy Process in a Steel Manufacturing Company

    OpenAIRE

    Tahriri, Farzad; Ale Ebrahim, Nader; Dabbagh, Mohammad

    2014-01-01

    Every organization needs suppliers and no organization can exist without suppliers. Therefore, the organizations approach to suppliers and the selection of the appropriate supplier, its acquisition processes and policies, and its relationships with suppliers, is of vital importance, both to organizations and suppliers alike. No organization can be successful without the support of its supplier base, operationally and strategically, short or long-term.To select the best supplier, it is essenti...

  11. Productive Resources in Students' Ideas about Energy: An Alternative Analysis of Watts' Original Interview Transcripts

    Science.gov (United States)

    Harrer, Benedikt W.; Flood, Virginia J.; Wittmann, Michael C.

    2013-01-01

    For over 30 years, researchers have investigated students' ideas about energy with the intent of reforming instructional practice. In this pursuit, Watts contributed an influential study with his 1983 paper "Some alternative views of energy" ["Phys. Educ." 18, 213 (1983)]. Watts' "alternative frameworks"…

  12. Recent progress on the BIPM watt balance

    Directory of Open Access Journals (Sweden)

    Fang Hao

    2014-01-01

    Full Text Available We present the recent progress on the BIPM (Bureau International des Poids et Mesures watt balance. The existing apparatus was transferred to the dedicated new laboratory with better thermal and vibrational conditions. The apparatus is fully operational in air. An improvement by a factor of three was achieved on the S/N ratio of both the voltage-to-velocity and force-to-current ratios. The fabrication of the parts of the new magnet is completed and its assembly is finished.

  13. A simplified, result oriented supplier performance management system testing framework for SME

    OpenAIRE

    Satya Parkash Kaushik; Veerender Kumar Kaushik

    2014-01-01

    Background: Supplier performance management continues to be a significant concern for small & medium enterprises (SME). How can small & medium enterprises better position themselves to check and sustain actual supplier performance improvement? A key framework is the establishment of a value-added supplier performance audit program that places significant emphasis on supplier performance controls. A value-added supplier audit program can help SME mitigate business and regulatory risk w...

  14. Green supplier development program selection using NGT and VIKOR under fuzzy environment

    DEFF Research Database (Denmark)

    Awasthi, Anjali; Govindan, Kannan

    2016-01-01

    Developing environmental performance of suppliers is critical for green supply chain management. Organizations are nowadays investing in various green supplier development programs to enhance their supplier performances. The decision to select the right program for green supplier development...... is often a challenging decision due to lack of prior experience, limited quantitative information, specific context of the organization, and varying supplier backgrounds. This paper addresses the problem of evaluating green supplier development programs and proposes a fuzzy NGT (Nominal Group Technique......)-VIKOR (VlseKriterijumska Optimizacija I Kompromisno Resenje) based solution approach. NGT is used to identify criteria for evaluating green supplier development programs. Fuzzy theory is used to address qualitative (linguistic) ratings for the alternatives and the selected criteria used under lack...

  15. Supplier Relationship Management dalam Pendekatan Contigency dan Best Practice

    OpenAIRE

    Supriharyanti, Elisabeth

    2005-01-01

    The supplier relationship is one important type of cooperation between and among firms. Supplier relationship management (SRM) is a part of the overall supply chain management process. Over the past several years, there has been significant shift in the way organization approach supplier relationship management. Recent year have seen an increased interest and involvement in partnership model. Several authors said that partnersip will deliver superior performance. The “best practice” model of ...

  16. Supplier selection an MCDA-based approach

    CERN Document Server

    Mukherjee, Krishnendu

    2017-01-01

    The purpose of this book is to present a comprehensive review of the latest research and development trends at the international level for modeling and optimization of the supplier selection process for different industrial sectors. It is targeted to serve two audiences: the MBA and PhD student interested in procurement, and the practitioner who wishes to gain a deeper understanding of procurement analysis with multi-criteria based decision tools to avoid upstream risks to get better supply chain visibility. The book is expected to serve as a ready reference for supplier selection criteria and various multi-criteria based supplier’s evaluation methods for forward, reverse and mass customized supply chain. This book encompasses several criteria, methods for supplier selection in a systematic way based on extensive literature review from 1998 to 2012. It provides several case studies and some useful links which can serve as a starting point for interested researchers. In the appendix several computer code wri...

  17. Modeling and analysis for determining optimal suppliers under stochastic lead times

    DEFF Research Database (Denmark)

    Abginehchi, Soheil; Farahani, Reza Zanjirani

    2010-01-01

    systems. The item acquisition lead times of suppliers are random variables. Backorder is allowed and shortage cost is charged based on not only per unit in shortage but also per time unit. Continuous review (s,Q) policy has been assumed. When the inventory level depletes to a reorder level, the total...... order is split among n suppliers. Since the suppliers have different characteristics, the quantity ordered to different suppliers may be different. The problem is to determine the reorder level and quantity ordered to each supplier so that the expected total cost per time unit, including ordering cost...

  18. Fabrication of three 2500-watt (thermal) strontium-90 heat sources

    International Nuclear Information System (INIS)

    DeVore, J.R.; Haff, K.W.; Tompkins, J.A.

    1986-08-01

    Three 2500-watt (thermal) heat sources were fabricated by the Oak Ridge National Laboratory (ORNL) for the purpose of fueling a 500-watt (electric) thermoelectric generator as part of the US Department of Energy's Byproducts Utilization Program (BUP). Each of the sources, which are the largest ever assembled, consist of hot-pressed pellets of 90 Sr fluoride, doubly encapsulated in three Haynes-25 inner capsules and in a Hastelloy-S outer capsule. The total 90 Sr inventory of all three sources is 1.12 million curies. The sources were fabricated at the ORNL Fission Product Development Laboratory (FPDL), which is a facility that is capable of processing multi-megacurie quantities of radioactive materials, chiefly 137 Cs and 90 Sr. The source was tested to determine compliance with all of the IAEA Safety Series No. 33 requirements. The source fabrication, assembly, and testing are described in the presentation

  19. AHP approach for supplier evaluation and selection in a steel manufacturing company

    OpenAIRE

    Tahriri, Farzad; Osman, M. Rasid; Ali, Aidy; Yusuff, Rosnah Mohd; Esfandiary, Alireza

    2008-01-01

    Supplier selection is one of the most critical activities of purchasing management in supply chain. Supplier selection is a complex problem involving qualitative and quantitative multi-criteria. A trade-off between these tangible and intangible factors is essential in selecting the best supplier. The work incorporates AHP in choosing the best suppliers. The results suggest that AHP process makes it possible to introduce the optimum order quantities among the selected suppliers so that the Tot...

  20. Development of the Sixty Watt Heat-Source hardware components

    International Nuclear Information System (INIS)

    McNeil, D.C.; Wyder, W.C.

    1995-01-01

    The Sixty Watt Heat Source is a nonvented heat source designed to provide 60 thermal watts of power. The unit incorporates a plutonium-238 fuel pellet encapsulated in a hot isostatically pressed General Purpose Heat Source (GPHS) iridium clad vent set. A molybdenum liner sleeve and support components isolate the fueled iridium clad from the T-111 strength member. This strength member serves as the pressure vessel and fulfills the impact and hydrostatic strength requirements. The shell is manufactured from Hastelloy S which prevents the internal components from being oxidized. Conventional drawing operations were used to simplify processing and utilize existing equipment. The deep drawing reqirements for the molybdenum, T-111, and Hastelloy S were developed from past heat source hardware fabrication experiences. This resulted in multiple step drawing processes with intermediate heat treatments between forming steps. The molybdenum processing included warm forming operations. This paper describes the fabrication of these components and the multiple draw tooling developed to produce hardware to the desired specifications. copyright 1995 American Institute of Physics

  1. A Fuzzy Decision Making Approach for Supplier Selection in Healthcare Industry

    OpenAIRE

    Zeynep Sener; Mehtap Dursun

    2014-01-01

    Supplier evaluation and selection is one of the most important components of an effective supply chain management system. Due to the expanding competition in healthcare, selecting the right medical device suppliers offers great potential for increasing quality while decreasing costs. This paper proposes a fuzzy decision making approach for medical supplier selection. A real-world medical device supplier selection problem is presented to illustrate the application of the proposed decision meth...

  2. Shifting orders among suppliers considering risk, price and transportation cost

    Science.gov (United States)

    Revitasari, C.; Pujawan, I. N.

    2018-04-01

    Supplier order allocation is an important supply chain decision for an enterprise. It is related to the supplier’s function as a raw material provider and other supporting materials that will be used in production process. Most of works on order allocation has been based on costs and other supply chain performance, but very limited of them taking risks into consideration. In this paper we address the problem of order allocation of a single commodity sourced from multiple suppliers considering supply risks in addition to the attempt of minimizing transportation costs. The supply chain risk was investigated and a procedure was proposed in the risk mitigation phase as a form of risk profile. The objective including risk profile in order allocation is to maximize the product flow from a risky supplier to a relatively less risky supplier. The proposed procedure is applied to a sugar company. The result suggests that order allocations should be maximized to suppliers that have a relatively low risk and minimized to suppliers that have a relatively larger risks.

  3. Strategy for Improving Efficiency of Supply Chain Quality Management in Buyer-Supplier Dyads: The Suppliers’ Perspective

    Directory of Open Access Journals (Sweden)

    Hyun Jung Kim

    2016-01-01

    Full Text Available This study analyzes the efficiency of supply chain quality management (SCQM by grouping buyers and suppliers and conducting an empirical analysis of aspects affecting SCQM efficiency from the supplier’s perspective. Two stages of data analysis were conducted: (1 classify buyer and supplier efficiency by means of data envelopment analysis (DEA and sort the data results into a 2×2 matrix and (2 conduct a statistical analysis to verify influential aspects. The results depict the average value of Group I to be higher than that of Group II, while the average value of Group IV was found to be much lower than that of Group III. In addition, specific aspects have a significant impact on certain groups: Groups I and II are affected by infrastructure, delivery of quality, talent development, and risk management in that order; Groups II and III are likewise influenced by risk management, talent development, and delivery of quality, whereas Groups III and IV are influenced by talent development, delivery of quality, and risk management in that order.

  4. Alternative of raw material’s suppliers using TOPSIS method in chicken slaughterhouse industry

    Science.gov (United States)

    Sari, R. M.; Rizkya, I.; Syahputri, K.; Anizar; Siregar, I.

    2018-02-01

    Chicken slaughterhouse industry is one of the fastest growing industries that depends on the freshness of raw materials. The raw materials quality arrive at the company depends heavily on the suppliers. Fresh chicken and frozen chicken meat are the main raw materials for this industry. Problems occurred by the suppliers are catering the amount of raw material needs that are not appropriate and also delay during delivery process. This condition causes disruption of the production process in the company. Therefore, it is necessary to determine the best suppliers to supply the main raw materials of fresh and frozen chicken meat on the slaughterhouse chicken industry. This study analyze the supplier’s capability by using TOPSIS method. This method use to find out the best supplier. The TOPSIS method is performed using the principle that chosen alternative must have the shortest distance from the positive solution and furthest from the ideal solution of the geometric point by using the Euclidean distance to determine the relative proximity of the optimum solution alternative. TOPSIS method found the rank of best supplier’s order is supplier A followed by supplier D, supplier B, supplier C, supplier E, supplier F, and supplier G. Based on the rank order obtained from each company, it will assist the company in prioritizing the order to the supplier with the best rank. Total supply from All suppliers are 885,994 kg per month. Based on the results of research, the top five suppliers have been sufficient to meet the needs of the company.

  5. Supplier selection problem: A state-of-the-art review

    Directory of Open Access Journals (Sweden)

    Nilesh R. Ware

    2012-08-01

    Full Text Available In the global competitiveness and growing market environment, “Actual competition is not between firms against firm, than supplier against supplier”. Globally in the fastest market development world gets closer and closer. Consumers prefer fast delivery, economical product, excellent service and high quality product with desired service level. For successful management of this supply chain, supplier considered as the base source for all processes. Therefore, an efficient supplier selection and evaluation process needs to be incorporate. The main purpose of this paper is to provide an extensive state-of-the-art literature review and critique of the studies related to various aspects of supplier selection problem over the past two decades. Research papers appearing in the reputed and leading international journals from 1991 to 2011 are gathered and analyzed. Primary focus is given on more than 200 published and unpublished works. It has been referred extensively to carry out state-of-the-art review for supplier selection problem. Finally, paper provides future perspective based on current research trends available in the published literature.

  6. Emerging nuclear suppliers in the Third World

    International Nuclear Information System (INIS)

    Stahl, K.

    1990-01-01

    The emergence of new supplier states of nuclear technology within the Third World has raised concern, if those nuclear supplier states will promote an unrestricted and uncontrolled transfer of nuclear technology to developing countries and augment the risk of nuclear weapons proliferation. The article analyses the nuclear export capacities, nuclear exports and the export policy of Argentina, Brazil and India. Argentina is considered as the most important emerging nuclear supplier state in the Third World. Nuclear exports have to be authorisized by the government in all three states and will be covered by IAEA-safeguards in the recipient country. The three states will exercise restraint in the transfer of sensitive nuclear technology. Nuclear exports of Argentina, Brazil and India so far will not augment the danger of nuclear weapons proliferation. (orig./HSCH) [de

  7. Supplier Value of Customer-Initiated Product Development

    DEFF Research Database (Denmark)

    Sommer, Anita Friis; Dukovska-Popovska, Iskra; Steger-Jensen, Kenn

    2013-01-01

    Increased market demand and shortened product life cycles generate industrial customer requests for collaborative product development. Manufacture-to-stock suppliers struggle to manage the request process to obtain profitability. The purpose of this paper is to investigate if request management...... is profitable for suppliers, and to examine possible relations between profitability of requests and the requesting customer. Through a case study, request management is identified as a profitable process due to long-term accumulated profit from developed products. Request profitability is not identified...... as related to profitability or turnover of existing customers, and thus profitability of requests cannot be predicted based on these customer data. Results from a coupled interview study indicate that request management has a large potential for future exploitation, and an outline of the supplier value...

  8. Gaining insight into the effects : the supplier perspective

    NARCIS (Netherlands)

    Michiel Steeman; Christiaan de Goeij; Paulien de Graaf-Muller

    2016-01-01

    In this paper we discuss what suppliers can do to get insight into the effects of Reverse Factoring (RF), currently the most used form of Supply Chain Finance (SCF). Even though the usage of RF is increasing, empirical evidence is scarce, especially from the point of view of suppliers.

  9. E-Sourcing platforms as reasonable marketing tools for suppliers

    OpenAIRE

    Göbl, Martin; Greiter, Thomas

    2014-01-01

    Research questions: E-sourcing platforms offer purchasing organisations often easy access to a high number of relevant suppliers, their goods and services and the accord-ing prices. For the suppliers, e-sourcing platforms are a good and easy pos-sibility to present their products and services to the relevant buyers and to get in contact with potential customers. Subject of this research will be the question, whether e-sourcing platforms are also a reasonable marketing tool for suppliers in or...

  10. Overview of nuclear export policies of major foreign supplier nations

    International Nuclear Information System (INIS)

    1977-01-01

    The United States faces increased competition from foreign nuclear suppliers, including West Germany, France, the United Kingdom, Canada, and possibly, in the near future, Japan. This general overview shows the differences and similarities in foreign nuclear supplier export requirements. It is based on summaries furnished by the Department of State covering the nuclear export policies and procedures of the major foreign supplier nations

  11. The 2017-2050 NegaWatt Scenario. Executive Summary

    International Nuclear Information System (INIS)

    2017-01-01

    The NegaWatt Association has released a new version of its 2050 energy outlook. Using improved and updated data, as well as refined tools and calculations, it confirms that France can reach 100% renewable energy by 2050 while phasing-out nuclear. The NegaWatt approach leads to achieving the energy transition, meeting the objectives of the Paris Climate Deal, and generating net benefits for the French economy, as confirmed by a financial and job assessment. First issued in 2003, and updated several times since then, our 2050 energy scenario for France is now a well acknowledged and recognised thorough piece of work to discuss the country's energy future, and options to engage in a sustainable energy transition. The scenario is supported by a large number of civil society organisations, and has been considered in official assessment studies and national energy debates. Covering all sectors (buildings, transport, industry, agriculture...) through thousands of parameters and sophisticated details, it shows how France could shift to a climate-friendly, nuclear-free, and sustainable energy future through an approach based on: energy sufficiency (favouring low energy services and lifestyles); energy efficiency (ensuring that energy is used in the most productive way); renewables (developing first the greenest forms of energy for our supply)

  12. Airbus’s Supplier Portal: changing a business paradigm

    NARCIS (Netherlands)

    E.M. van Raaij (Erik); J.C.M. van den Ende (Jan); D. Baumann (Dominic)

    2015-01-01

    textabstractWith procurement volume determining 75 to 80 per cent of costs, Airbus heavily depends on its 1,000 or more key suppliers. As a solution to the complexity of its supply chain, it introduced a portal to serve as an electronic marketplace for all interactions with its suppliers. Five years

  13. Mirror, mirror on the wall... Let suppliers guide you towards improvement

    NARCIS (Netherlands)

    Weele, van A.J.; Rozemeijer, F.A.; Capaldo, G.; Esposito, E.; Lo Sorto, C.; Raffa, M.

    1998-01-01

    Suppliers may have a major impact on a firm's performance. The limitations of "traditional" buyer-supplier relationships are becoming more widely recognised. Co-operative relationships between suppliers and customers are attracting a lot of attention in today's business environment. Eurotel, a large

  14. The Ideal Criteria of Supplier Selection for SMEs Food Processing Industry

    Directory of Open Access Journals (Sweden)

    Ramlan Rohaizan

    2016-01-01

    Full Text Available Selection of good supplier is important to determine the performance and profitability of SMEs food processing industry. The lack of managerial capability on supplier selection in SMEs food processing industry affects the competitiveness of SMEs food processing industry. This research aims to determine the ideal criteria of supplier for food processing industry using Analytical Hierarchy Process (AHP. The research was carried out in a quantitative method by distributing questionnaires to 50 SMEs food processing industries. The collected data analysed using Expert Choice software to rank the supplier selection criteria. The result shows that criteria for supplier selection are ranked by cost, quality, service, delivery and management and organisation while purchase cost, audit result, defect analysis, transportation cost and fast responsiveness are the first five sub-criteria. The result of this research intends to improve managerial capabilities of SMEs food processing industry in supplier selection.

  15. Nuclear liability and research reactor fuel. A plant supplier's view

    International Nuclear Information System (INIS)

    Roegler, H.-J.; Hetzmann, A.

    2000-01-01

    Contracts on Research Reactors are normally entered into by the owner and - very often - later user and the supplier of such plants. They are not concluded by the fuel supplier, except fuel supplier and plant supplier are identical. Thus, the fuel supplier mostly has no direct influence into the contract negotiations and the clauses which are eventually agreed upon between the parties. So has any other subcontractor for any other system or component. Any such subsupplier can and will negotiate a subsidiary supply contract (subcontract) with the supplier of the plant. The supplier drafts the related clauses so as to pass on to the subsupplier as many risks out of his contracts as possible. The subsupplier, on the other hand, tries to protect himself, tries to limit the risks he takes over, e.g. to the worth of his subcontract maximum. A critical issue in such negotiations is those concerning the risks the supplier had to accept and the subsupplier, although he may be responsible later for the risk changing to reality; i.e. the occurrence of a loss, cannot be hold liable for in full because the subcontract limits his liability, e.g. to the subcontract value or a certain delay penalty. A typical example for this conflict are delays of the entire project caused by one subsupplier. A very specific case in this context is the so-called nuclear liability. Nuclear liability means being hold responsible for the consequences or damages originating from a nuclear event in the plant. Those consequences or damages may be suffered by third parties, which are neither the owner/operator nor the supplier and result in a liability to such party (third party liability). Several of the aspects below may be related to the nuclear liability issue: The supplier often has its registered office not in the country where the plant is; The supplier may have far bigger assets than the owner/operator. The legal system of the supplier's country may be more favourable for enforcing claims of

  16. Two ATLAS suppliers honoured

    CERN Multimedia

    2007-01-01

    The ATLAS experiment has recognised the outstanding contribution of two firms to the pixel detector. Recipients of the supplier award with Peter Jenni, ATLAS spokesperson, and Maximilian Metzger, CERN Secretary-General.At a ceremony held at CERN on 28 November, the ATLAS collaboration presented awards to two of its suppliers that had produced sensor wafers for the pixel detector. The CiS Institut für Mikrosensorik of Erfurt in Germany has supplied 655 sensor wafers containing a total of 1652 sensor tiles and the firm ON Semiconductor has supplied 515 sensor wafers (1177 sensor tiles) from its foundry at Roznov in the Czech Republic. Both firms have successfully met the very demanding requirements. ATLAS’s huge pixel detector is very complicated, requiring expertise in highly specialised integrated microelectronics and precision mechanics. Pixel detector project leader Kevin Einsweiler admits that when the project was first propo...

  17. Sustaining Competitiveness Through product Development Activities Within Malaysian Automotive Suppliers

    Directory of Open Access Journals (Sweden)

    Norizah Mohamad

    2012-01-01

    Full Text Available The local automotive suppliers are facing a number of important challenges such asglobalisation, new requirement in market specifications and the competition brought about by theAsean Free Trade Area (AFTA agreements. In an effort to enhance the competitiveness of themanufacturing sector, the government has implemented the Second Industrial Master Plan, IMP2(1996-2005. The focus of the IMP2 is more on innovation and applications of new technologies, sothat industries can move up the value chain of their activities. Innovative capabilities achieved fromcompanies’ new product development activities have been recognized to be crucial for companies tosustain their competitiveness and organisational success. The importance of product development ismost obvious in the context of the discussion on the competitiveness of the Malaysian automotivesuppliers. The study will focus on the small medium enterprises (SMEs that make up more than 60 %of these automotive suppliers. The study is to determine the extensiveness of the suppliers’ productdevelopment activities by examining the involvement of the suppliers in customer’s productdevelopment activities. Consequently, the impact of this involvement to the competitiveness of thesuppliers is examined. The results were established based from a survey to parts and componentssuppliers of Proton, the Malaysian car national assembler. The study has shown that the SMEs wereinvolved from the early stages of the product development process that is during the design stage. Theproduct development efforts have shown to contribute towards increasing firms’ market share andfirms were also able to gain a better understanding of future product demand. A significant number ofthe suppliers have managed to penetrate the export market. Unfortunately, among the respondents,there is only one system supplier. This indicates that, either the technological capabilities of theSMEs still needed upgrading for the requirement as

  18. Would you procure radioactive containers without a supplier quality evaluation?

    International Nuclear Information System (INIS)

    Hawk, M.; Kapoor, A.; Natali, R.B.

    2004-01-01

    U.S. Department of Energy (DOE) sites/contractors purchase several different types of containers (such as boxes, drums, large bulk dump trucks, railcars, cargo containers, burrito wraps, and super sacks) for use in the storage and transportation of low-level waste. These containers are purchased from several suppliers - all of whom must be pre-approved according to DOE rules, orders and guidelines - and the suppliers must manufacture the containers to exact specifications and designs supplied by the DOE site/contractor. DOE studies and qualitative evaluations indicate that the current supplier evaluation process is too costly and inefficient. Therefore, DOE, in coordination with sites/contractors, instituted a corporate approach to centralize the supplier quality evaluation program for the procurement of containers. That effort resulted in the development of this Container Suppler Evaluation Program. The program was implemented when two suppliers were evaluated using this program

  19. Would you procure radioactive containers without a supplier quality evaluation?

    Energy Technology Data Exchange (ETDEWEB)

    Hawk, M. [Oak Ridge National Lab., TN (United States); Kapoor, A.; Natali, R.B.

    2004-07-01

    U.S. Department of Energy (DOE) sites/contractors purchase several different types of containers (such as boxes, drums, large bulk dump trucks, railcars, cargo containers, burrito wraps, and super sacks) for use in the storage and transportation of low-level waste. These containers are purchased from several suppliers - all of whom must be pre-approved according to DOE rules, orders and guidelines - and the suppliers must manufacture the containers to exact specifications and designs supplied by the DOE site/contractor. DOE studies and qualitative evaluations indicate that the current supplier evaluation process is too costly and inefficient. Therefore, DOE, in coordination with sites/contractors, instituted a corporate approach to centralize the supplier quality evaluation program for the procurement of containers. That effort resulted in the development of this Container Suppler Evaluation Program. The program was implemented when two suppliers were evaluated using this program.

  20. SUPPLIER SELECTION CRITERIA IN A POWER UTILITY IN MALAYSIA: ENGINEERS’ PERCEPTIONS

    Directory of Open Access Journals (Sweden)

    Sivadass Thiruchelvam

    2012-06-01

    Full Text Available Supplier selection of electricity generating, transmitting and distributing systems is part of the problem-solving environment in a power utility because it is a long-term investment for the organisation. Therefore, the decision over supplier selection directly influences the operational and financial position of a power utility. In addition, the supplier selection of a power-related system is a complex multi-criteria decision problem. While some criteria may be common across different industries, there are some criteria unique to the power industry. This research aims to understand what constitutes the suitable supplier selection criteria for a power utility. This study reveals some interesting findings of how engineers perceive the importance of each criterion and suggests strongly that product quality, price and delivery are key determinants in the supplier evaluation process. The eighteen criteria considered for this study were mapped onto their respective cluster, namely: supplier’s organisational system and technology, buyer-supplier relationship and economic value. The findings of this study should assist various groups of stakeholders (e.g., suppliers, buyers and end users to gain a better understanding of social behaviour in making purchase decisions, particularly with regard to power utilities.

  1. ATLAS honours one of its suppliers

    CERN Multimedia

    2003-01-01

    On 12 February the Netherlands firm Schelde Exotech was awarded a prize for best ATLAS supplier for the construction of the two vacuum chambers for the ATLAS endcap toroid magnets. The award for best supplier is handed over to representatives of the firm Schelde Exotech in front of one of the two vacuum chambers built by the firm. From left to right: E. Baynham (RAL), H. Geerink (NIKHEF), Y. Lefevere (NIKHEF), J. Engelen (NIKHEF), P. Jenni (CERN), E. Holtom (RAL), R. Boddaert (Schelde Exotech), G. Luijckx (NIKHEF), H. Klumpus (Schelde Exotech), M. Nessi (CERN), H. ten Kate (CERN), M. Nordberg (CERN), H. Hoffmann (CERN).This ceremony has now become something of a tradition. For the third consecutive year, ATLAS has given best supplier awards for the most exceptional contributors to the construction of the future detector. The Netherlands firm Schelde Exotech has just received the award for the construction of the two vacuum chambers for the ATLAS endcap toroid magnets. With a diameter of 11 metres and a volum...

  2. The LHC's suppliers come up trumps

    CERN Multimedia

    2006-01-01

    Four of the LHC Project's most exceptional suppliers have just been honoured in the fifth Golden Hadron awards ceremony. For the first time, a CERN team was among the prize-winners. The CERN main workshop (Mechanical and Materials Engineering group, TS/MME) received the Golden Hadron Award at the prize-giving ceremony held at the Globe. From left to right, Saïd Atieh (TS/MME), Vincent Vuillemin (TS/MME group leader), Michel Caccioppoli (TS/MME), Lyn Evans (LHC Project Leader), Marc Polini (TS/MME-MS section leader), Jean-Luc Gayraud (Cegelec), Jean-Paul Bacher (TS/MME-AS section leader) and Paolo Ciriani (head of the TS Department). Flexible, responsive, committed... all fitting adjectives to describe the recipients of the fifth Golden Hadron awards. The prizes, designed to honour the LHC Project's best suppliers, were awarded to a total of four suppliers, including two that are involved in the final accelerator assembly work: proof, if it were needed, that the project has now entered its final phase. Drak...

  3. Development and integration of high straightness flexure guiding mechanisms dedicated to the METAS watt balance Mark II

    Science.gov (United States)

    Cosandier, F.; Eichenberger, A.; Baumann, H.; Jeckelmann, B.; Bonny, M.; Chatagny, V.; Clavel, R.

    2014-04-01

    There is a firm will in the metrology community to redefine the kilogram in the International System of units by linking it to a fundamental physical constant. The watt balance is a promising way to link the mass unit to the Planck constant h. At the Federal Institute of Metrology METAS a second watt balance experiment is under development. A decisive part of the METAS Mark II watt balance is the mechanical linear guiding system. The present paper discusses the development and the metrological characteristics of two guiding systems that were conceived by the Laboratoire de Systèmes Robotiques of EPFL and built using flexure mechanical elements. Integration in the new setup is also described.

  4. Supplier selection in automobile industry: A mixed balanced scorecard–fuzzy AHP approa

    Directory of Open Access Journals (Sweden)

    Masoud Rahiminezhad Galankashi

    2016-03-01

    Full Text Available This study proposed an integrated Balanced Scorecard–Fuzzy Analytic Hierarchical Process (BSC–FAHP model to select suppliers in the automotive industry. In spite of the vast amount of studies on supplier selection, the evaluation and selection of suppliers using the specific measures of the automotive industry are less investigated. In order to fill this gap, this research proposed a new BSC for supplier selection of automobile industry. Measures were gathered using a literature survey and accredited using Nominal Group Technique (NGT. Finally, a fuzzy AHP was used to select the best supplier.

  5. WaterWatts : the world's only all-drainwater heat exchanger : introduction and test data

    Energy Technology Data Exchange (ETDEWEB)

    Richards, C. [Saskatchewan Univ., Saskatoon, SK (Canada). College of Engineering; MacKelvie, W. [Winston Works Inc., Knowlton, PQ (Canada)

    2005-05-02

    This document presented the innovative All-buildings, All-Drainwater Heat Exchanger, a new method of saving energy in buildings. Water heating is the second largest user of energy in buildings. The used hot water is typically just drained away to the sewer, resulting in a significant waste of energy and money. Winston Works developed and patented the WaterWatts product which uses the normally-wasted heat in the drainwater of showers, tubs and washing machines to preheat all of the cold water for the water heater. The result is greener hot water through a significant reduction in energy use and related emissions. Drainflow is not hindered in any way. The unit can be installed by removing a section of vertical or horizontal drainpipe and replacing it with WaterWatts. The water heater's cold water supply is then redirected to first go through WaterWatts. This type of drainwater heat recovery system has a drainwater heat exchanger (DWHEx) that cools the drainwater by transferring its heat to a cold water heat exchanger (CWHEx). In the horizontal WaterWatts, the DWHEx is hemicylindrical to provide a broad flat surface for the drainwater to transfer its heat to rapidly. The flat shape also provides an ideal outside surface for fins which keep the tube cold. The vertical DWHEx has the same large, straight copper tube as the competition. But unlike the competition, WaterWatts has no moving parts, uses no power, requires no maintenance, has an indefinitely long life and is easy to install with minimal capital investment. Every building where the cost of hot water is borne by the owner is a potential customer for this product, such as residences, laundromats and restaurants. This energy savings technology also works with industrial process drainwater of any composition and temperature. tabs., figs.

  6. The supplier relationship practices of travel agencies in the Western Cape Province - What is the status quo?

    Directory of Open Access Journals (Sweden)

    Mornay Roberts-Lombard

    2010-12-01

    Full Text Available Purpose: The purpose of the article is to explore the supplier relationship practices of travel agencies in the Western Cape province. The article wants to establish the current supplier relationship practices of travel agencies in the province and to identify limitations in supplier market relationships which might exist in the industry. Problem investigated: Relationships are the basis on which trade in the travel industry is built (George, 2006:224. The establishment and management of these relationships must be to the advantage of all parties in the relationship (Swart, 2003:120. Townes (2007 indicated that the current level of relationships that exists between travel agencies and their suppliers, especially the South African Airways (SAA, the Protea and Southern Sun hotel groups and motor vehicle rental companies such as AVIS is fragmented and negatively impairs on the ability of travel agents to deliver a quality service to their customers. To improve their overall level of service delivery to both corporate and leisure customers, it is important for travel agencies to know and understand the current level of their relationships with suppliers. It is against this background that the research was undertaken. Methodology: The target population for this study was 118 travel agencies of which 61 managers and/or owners participated through personal interviews in the completion of questionnaires. Data analysis was done by calculating averages and standard deviations, Explorative Factor Analysis (EFA, Cronbach Alpha-values and practical significance by means of effect sizes. Findings: The owners and managers of travel agencies are of the opinion that the strengthening of their existing relationships with suppliers must be prioritised. More emphasis should be placed on the strengthening of existing communication channels between travel agencies and their suppliers to secure the faster resolution of queries and complaints and to enhance the sharing

  7. Competing of Sznajd and Voter Dynamics in the Watts-Strogatz Network

    Science.gov (United States)

    Rybak, M.; Kułakowski, K.

    We investigate the Watts-Strogatz network with the clustering coefficient C dependent on the rewiring probability. The network is an area of two opposite contact processes, where nodes can be in two states, S or D. One of the processes is governed by the Sznajd dynamics: if there are two connected nodes in D-state, all their neighbors become D with probability p. For the opposite process it is sufficient to have only one neighbor in state S; this transition occurs with probability 1. The concentration of S-nodes changes abruptly at given value of the probability p. The result is that for small p, in clusterized networks the activation of S nodes prevails. This result is explained by a comparison of two limit cases: the Watts-Strogatz network without rewiring, where C=0.5, and the Bethe lattice where C=0.

  8. 49 CFR 583.10 - Outside suppliers of passenger motor vehicle equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Outside suppliers of passenger motor vehicle... CONTENT LABELING § 583.10 Outside suppliers of passenger motor vehicle equipment. (a) For each unique type of passenger motor vehicle equipment for which a manufacturer or allied supplier requests information...

  9. Industrial Buyer-Supplier Cooperation

    DEFF Research Database (Denmark)

    Olsen, Rasmus Friis

    The dissertation considers industrial buyer-supplier cooperation from a systems and management perspective. The purpose is to discuss and elaborate on the buying company’s choice of cooperation strategy (governance mechanism). It is stated that no single governance mechanism will be the best in all...

  10. A Preference Model for Supplier Selection Based on Hesitant Fuzzy Sets

    Directory of Open Access Journals (Sweden)

    Zhexuan Zhou

    2018-03-01

    Full Text Available The supplier selection problem is a widespread concern in the modern commercial economy. Ranking suppliers involves many factors and poses significant difficulties for decision makers. Supplier selection is a multi-criteria and multi-objective problem, which leads to decision makers forming their own preferences. In addition, there are both quantifiable and non-quantifiable attributes related to their preferences. To solve this problem, this paper presents a preference model based on hesitant fuzzy sets (HFS to select suppliers. The cost and service quality of suppliers are the main considerations in the proposed model. HFS with interactive and multi-criteria decision making are used to evaluate the non-quantifiable attributes of service quality, which include competitive display, qualification ability, suitability and competitiveness of solutions, and relational fitness and dynamics. Finally, a numerical example of supplier selection for a high-end equipment manufacturer is provided to illustrate the applicability of the proposed model. The preferences of a decision maker are then analyzed by altering preference parameters.

  11. Routes towards supplier and production network internationalisation

    OpenAIRE

    A. CAMUFFO; FURLAN A; ROMANO P; VINELLI A

    2007-01-01

    Purpose – The purpose of this paper is to investigate routes towards supplier and production network internationalisation. Design/methodology/approach – Multiple case-study analysis has been applied to a sample of 11 Italian footwear and apparel companies with headquarters located in the North-east of Italy. Within and cross-case analyses illustrate and compare how these firms relocated one or more segments of their supplier and production networks to Romania. Findings – The...

  12. A multiobjective optimization model for optimal supplier selection in multiple sourcing environment

    Directory of Open Access Journals (Sweden)

    M. K. Mehlawat

    2014-06-01

    Full Text Available Supplier selection is an important concern of a firm’s competitiveness, more so in the context of the imperative of supply-chain management. In this paper, we use an approach to a multiobjective supplier selection problem in which the emphasis is on building supplier portfolios. The supplier evaluation and order allocation is based upon the criteria of expected unit price, expected score of quality and expected score of delivery. A fuzzy approach is proposed that relies on nonlinear S-shape membership functions to generate different efficient supplier portfolios. Numerical experiments conducted on a data set of a multinational company are provided to demonstrate the applicability and efficiency of the proposed approach to real-world applications of supplier selection

  13. 49 CFR 583.11 - Allied suppliers of passenger motor vehicle equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Allied suppliers of passenger motor vehicle... CONTENT LABELING § 583.11 Allied suppliers of passenger motor vehicle equipment. (a) For each unique type of passenger motor vehicle equipment which an allied supplier supplies to the manufacturer with which...

  14. What a utility expects from its supplier organizations

    International Nuclear Information System (INIS)

    Winitsky, H.B.

    1986-01-01

    The suppliers of its goods and services are a most important resource of the utility industry. The unique and mutually beneficial technical relationship between utilities and their suppliers has been and continues to be a major contributor to the power industry's viability, vitality and growth, and thus to America's standard of living. The commercial and legal aspects of this relationship have been changing. This paper addresses the principles of: reasonably allocating and responsibility and accountability for ''the products'' provided to utilities including nuclear utilities; equitable risk-sharing as a prime requirement of utility procurement decision making; and the present and future relationship of the unique supplier/utility partnership as influenced and shaped by these requirements

  15. Managing supplier relationships in a new product development context

    NARCIS (Netherlands)

    Sjoerdsma, M.; Weele, van A.J.

    2015-01-01

    Organizations can no longer rely solely on their own resources to innovate and therefore look for strategic interactions outside their organizational boundaries. During the past years Early Supplier Involvement, supplier relationship management (SRM) and knowledge exchange in supply chain

  16. Quantum transport with long-range steps on Watts-Strogatz networks

    Science.gov (United States)

    Wang, Yan; Xu, Xin-Jian

    2016-07-01

    We study transport dynamics of quantum systems with long-range steps on the Watts-Strogatz network (WSN) which is generated by rewiring links of the regular ring. First, we probe physical systems modeled by the discrete nonlinear schrödinger (DNLS) equation. Using the localized initial condition, we compute the time-averaged occupation probability of the initial site, which is related to the nonlinearity, the long-range steps and rewiring links. Self-trapping transitions occur at large (small) nonlinear parameters for coupling ɛ=-1 (1), as long-range interactions are intensified. The structure disorder induced by random rewiring, however, has dual effects for ɛ=-1 and inhibits the self-trapping behavior for ɛ=1. Second, we investigate continuous-time quantum walks (CTQW) on the regular ring ruled by the discrete linear schrödinger (DLS) equation. It is found that only the presence of the long-range steps does not affect the efficiency of the coherent exciton transport, while only the allowance of random rewiring enhances the partial localization. If both factors are considered simultaneously, localization is greatly strengthened, and the transport becomes worse.

  17. Design and construction of a low cost 50-watt capacity ...

    African Journals Online (AJOL)

    This paper describes the design and construction of a stand-by mode 50-Watt Uninterruptible Power Supply (UPS) as an alternative power supply for electrical and electronic appliances from local materials. The development of this UPS system (a system consisting of battery source, inverter, and switching unit) is to provide ...

  18. Development of a Soundproof Device for 950 Watt rated Portable ...

    African Journals Online (AJOL)

    The noise emanating from generators has adverse effects on our health. In view of this, this paper reports the development of soundproof device for 950Watt rated generators which are widely used portable generators. Performance evaluation of the soundproof device was carried out, and the sound pressure level of the ...

  19. Innovation During the Supplier Selection Process

    DEFF Research Database (Denmark)

    Pilkington, Alan; Pedraza, Isabel

    2014-01-01

    Established ideas on supplier selection have not moved much from the original premise of how to choose between bidders. Whilst we have added many different tools and refinements to choose between alternative suppliers, its nature has not evolved. We move the original selection process approach...... observed through an ethnographic embedded researcher study has refined the selection process and has two selection stages one for first supply covering tool/process developed and another later for resupply of mature parts. We report the details of the process, those involved, the criteria employed...... and identify benefits and weaknesses of this enhanced selection process....

  20. Where to place the saving obligation: Energy end-users or suppliers?

    International Nuclear Information System (INIS)

    Bertoldi, Paolo; Labanca, Nicola; Rezessy, Silvia; Steuwer, Sibyl; Oikonomou, Vlasis

    2013-01-01

    Obligations to save energy differentiate, among other features, by obliged parties. These are obligations on energy suppliers and energy end-users. Supplier obligations have been introduced in North America, Europe and Australia. Under supplier obligations energy suppliers have to comply with mandatory energy saving targets and thus they implement (directly or via third parties) energy efficiency projects on their clients’ premises, or they decide to trade certified project savings if this option is envisaged by their obligation scheme. In several emerging schemes such as the UK Carbon Reduction Commitment (CRC) Energy Efficiency Scheme, the Tokyo Emission Trading Scheme or the Perform Achieve and Trade (PAT) Scheme in India, the obligation to reduce energy consumption is placed on large end-users directly and end-users are allowed to trade emissions allowances or energy saving certificates. The paper starts with presenting these two conceptually different ways for introducing energy saving obligations. Then it analyses advantages and disadvantages of end-users obligations compared to suppliers obligations. The preliminary conclusion of the paper is that supplier obligations seem to be well-suited for the residential sector, but end-user saving obligations may offer advantages when it comes to the industrial and commercial sectors. - Highlights: • We present different ways for introducing energy saving obligations. • We analyse energy end-users obligations vs. supplier obligations. • Supplier obligations seem to be well-suited for the residential sector. • End-user obligations offer advantages in the industrial and commercial sectors

  1. A LEGO Watt balance: An apparatus to determine a mass based on the new SI

    Science.gov (United States)

    Chao, L. S.; Schlamminger, S.; Newell, D. B.; Pratt, J. R.; Seifert, F.; Zhang, X.; Sineriz, G.; Liu, M.; Haddad, D.

    2015-11-01

    A global effort to redefine our International System of Units (SI) is underway, and the change to the new system is expected to occur in 2018. Within the newly redefined SI, the present base units will still exist but be derived from fixed numerical values of seven reference constants. In particular, the unit of mass (the kilogram) will be realized through a fixed value of the Planck constant h. A so-called watt balance, for example, can then be used to realize the kilogram unit of mass within a few parts in 108. Such a balance has been designed and constructed at the National Institute of Standards and Technology. For educational outreach and to demonstrate the principle, we have constructed a LEGO tabletop watt balance capable of measuring a gram-level masses to 1% relative uncertainty. This article presents the design, construction, and performance of the LEGO watt balance and its ability to determine h.

  2. '…to whom it will be extremly Usefull.' Dr William Cullen's adoption of James Watt's copying machine.

    Science.gov (United States)

    Wheelock, H

    2016-06-01

    Dr William Cullen (1710-1790) was a leading physician of the Enlightenment era. As professor in Edinburgh he became the most influential teacher of theoretical and practical medicine in 18th century Britain. A renowned private practitioner, Cullen systematically archived his postal 'consultations', now held by the Royal College of Physicians of Edinburgh. Initially Cullen preserved his replies as transcriptions, but from April 1781 he began using a mechanical copier, newly devised by the Scottish engineer James Watt. This paper describes the development, promotion and functioning of Watt's copier and considers Cullen's own adoption of the machine. It is suggested that with Cullen's adoption of Watt's copier, medical record keeping entered a new historical phase comparable with the recent digital revolution.

  3. The responsibility of nuclear suppliers in the international market

    International Nuclear Information System (INIS)

    Thiessen, C.W.; Cotton, J.D.; Tait, B.I.

    1978-01-01

    As a result of escalating oil prices, the developing countries are more and more turning to nuclear energy. As these countries become a more significant part of the international market, unique issues must be faced by the utility and country concerned and the nuclear supplier. A fundamental prerequisite of a successful supplier/customer relationship is a good relationship between their two governments. The supplier can fulfil an effective liaison function to ensure efficiency of communications in this area. In the preplanning phase the supplier can play a major role in supplying information relative to siting, unit size, system planning and plant economics. Once the nuclear choice is made, the pros and cons of purchasing plants on a turnkey versus non-turnkey basis must be weighed. The customer must balance his available resources and experience against his desires for acquisition of overall plant and systems knowledge. During the planning and procurement phase the subject of training, maintenance and service facilities can be an effective part of a comprehensive nuclear programme. In fact, local training and service centres could logically be the first step of a long-term localization effort. With respect to localization the supplier should be capable and experienced in developing this capability and willing to make a long-term commitment in this area. Through a clearer understanding of the responsibilities of the nuclear supplier and a clear delineation of his role, developing nations can more adequately assess the basis upon which to move forward on a nuclear programme. (author)

  4. Optimization of solar cell contacts by system cost-per-watt minimization

    Science.gov (United States)

    Redfield, D.

    1977-01-01

    New, and considerably altered, optimum dimensions for solar-cell metallization patterns are found using the recently developed procedure whose optimization criterion is the minimum cost-per-watt effect on the entire photovoltaic system. It is also found that the optimum shadow fraction by the fine grid is independent of metal cost and resistivity as well as cell size. The optimum thickness of the fine grid metal depends on all these factors, and in familiar cases it should be appreciably greater than that found by less complete analyses. The optimum bus bar thickness is much greater than those generally used. The cost-per-watt penalty due to the need for increased amounts of metal per unit area on larger cells is determined quantitatively and thereby provides a criterion for the minimum benefits that must be obtained in other process steps to make larger cells cost effective.

  5. Customer retention through supplier-organization-customer relationship management

    OpenAIRE

    Žvirelienė, Renata; Bučiūnienė, Ilona; Škudienė, Vida; Sakalas, Algimantas

    2009-01-01

    The research objective was to assess the relationship marketing outputs' (internal relationship, relationship with customer, relationship with supplier) interrelationship and their relationship with customers' retention. The internal and external relationship dimensions of commitment, satisfaction, trust, communication, cooperation and empathy were used to measure supplier-organization-customer relationship strength. The survey was conducted in cargo vehicles trading industry companies in Lit...

  6. ABOUT INDEX EVALUATION OF MATERIAL RESOURCE SUPPLIER SELECTION

    OpenAIRE

    V. A. Skochinskaya

    2008-01-01

    The paper analyzes existing methods for evaluation of material resource supplier selection. It shows advantages and shortcomings of the present evaluation systems. The necessity for application of an index evaluation is justified in the paper. The paper contains rating (index) evaluation for material resource supplier selection which is based on the application of quantitative (index) tool instead of an expert (numerical) evaluation. 

  7. Understanding Supplier Resistance - Overcoming Obstacles to Supply Innovation

    Directory of Open Access Journals (Sweden)

    New Steve

    2014-11-01

    Full Text Available This paper explores an important but unexplored theme in the development of 'total quality' relationships in the supply chain: why suppliers may exhibit resistance to quality initiatives, and why what seems to customers as cooperation can appear as unwelcome interference or even exploitation to suppliers. This is a question of great relevance to all those seeking to understand current business practice, and also to those seeking to bring about practical improvements in supply chain quality. Too much of the supply chain and quality literature assumes the issue of supplier's compliance with customer initiatives is unproblematic (unable to understand this sentence; experience suggests it is one of the major obstacles in developing the quality-oriented, integrated supply chain.

  8. Potential for efficient frequency conversion at high average power using solid state nonlinear optical materials

    International Nuclear Information System (INIS)

    Eimerl, D.

    1985-01-01

    High-average-power frequency conversion using solid state nonlinear materials is discussed. Recent laboratory experience and new developments in design concepts show that current technology, a few tens of watts, may be extended by several orders of magnitude. For example, using KD*P, efficient doubling (>70%) of Nd:YAG at average powers approaching 100 KW is possible; and for doubling to the blue or ultraviolet regions, the average power may approach 1 MW. Configurations using segmented apertures permit essentially unlimited scaling of average power. High average power is achieved by configuring the nonlinear material as a set of thin plates with a large ratio of surface area to volume and by cooling the exposed surfaces with a flowing gas. The design and material fabrication of such a harmonic generator are well within current technology

  9. INPO Perspectives and Activities to Enhance Supplier Human Performance and Safety Culture

    International Nuclear Information System (INIS)

    Duncan, R. J.

    2016-01-01

    Within their own organizations, utilities have made significant improvements in human performance and safety culture, supported by a strong community of practice through INPO and WANO. In recent years, utilities have been making increasing use of suppliers for design, construction, inspection and maintenance services in support of their NPPs. Many of these suppliers do not have the benefit of being members of a community of practice when it comes to human performance and safety culture. To help the supplier community make improvements similar to what the utilities have achieved, INPO has recently expanded its Supplier Participant program to address the issue of human performance and safety culture in the supplier community. The intent of this paper will be to share the INPO’s perspectives and activities in helping suppliers of services and products to NPPs enhance their human performance and safety culture. (author)

  10. Strategic wholesale pricing for an incumbent supplier facing with a competitive counterpart.

    Science.gov (United States)

    Sun, Jianwu

    2014-01-01

    We introduce a wholesale pricing strategy for an incumbent supplier facing with a competitive counterpart. We propose a profit function which considers both the present loss and future loss from a wholesale price and then study the optimal wholesale prices for different objectives about this profit function for the incumbent supplier. First, we achieve an optimal wholesale price for the incumbent supplier to maximize his expected profit. Then, to reduce the risk originating from the fluctuation in the competitive supplier's wholesale price, we integrate the conditional value-at-risk (CVaR) measure in financial risk management into this study and derive an optimal wholesale price to maximize CVaR about profit for the incumbent supplier. Besides, the properties of the two optimal wholesale prices are discussed. Finally, some management insights are suggested for the incumbent supplier in a competitive setting.

  11. Supplier relationship management – anathema for the South African public procurement sector

    OpenAIRE

    Micheline J. Naude; Intaher M. Ambe; René Kling

    2013-01-01

    The public sector is recognised as being one of the most important customer groups for many suppliers and service providers because of the volume of public expenditure. Supplier relationship management (SRM) is a necessary tool on which businesses in the public and private sectors rely. However, in the South African public sector, despite the intention to boost service delivery through efficient and effective supplier-management processes, the development of sound supplier relationships is a ...

  12. Supplier integration for new product developments: antecedents for supplier integration in modular product designs

    NARCIS (Netherlands)

    Eggers, Justus Erich

    2016-01-01

    Original equipment manufacturers (OEMs) increasingly integrate supplier resources in new product developments (NPD) to overcome bottlenecks of resource and to create competitive advantages. At the same time, OEMs react to the new market challenges by implementing modular product designs. Despite the

  13. Team Risk Management: A New Model for Customer-Supplier Relationships

    Science.gov (United States)

    1994-07-01

    Management : A New Model for Customer - Supplier Relationships Ronald P. Higuera "Audrey J. Dorofee Julie A. Walker Ray C. Williams July 1994 ""•// 94...N/A N/A N/A 11. TITLE (Include Secuity Claaaificatioa) Team Risk Management : A New Model for Customer -Supplier Relationships 12. PERSONAL AUTHOR(S...by block number) FIELD GROUP SUB. GR. Customer - Supplier Relationships Risk Team Risk Management 19. ABSTRACT (cominus on = if necesaryd id’y by block

  14. Supplier Choice Knowledge Support in the Supply Chain

    Directory of Open Access Journals (Sweden)

    Ekaterina Khitilova

    2015-01-01

    Full Text Available The paper focuses on the issue of choice of suppliers in the market environment. It discusses expert systems as modern methods of its computer support. The issue of supplier choice is presented and viewpoints for the formulation of the decision-making task introduced. The piece of writing furthermore pinpoints the expert character of the solution of this task, making use of the knowledge of experienced professionals. It introduces the principles of fuzzy oriented expert systems as a suitable solution of the task at hand. Language models of the expert systems formalise the high quality mental models of an experienced expert. The global decision-making task is split into partial tasks; the expert modules for their formalisation are integrated into the hierarchic structure. The paper presents the structures of language models and the implementation of the structure of expert systems in the MATLAB-Simulink program environment. Special attention is paid to the issue of supplier flexibility. The efficiency of the decision-making system is proven by the solution of a simulation exercise which represents the classification of two current and two newly contemplated suppliers with various characteristics. The results are analysed and commented on.

  15. Preferential customer treatment by suppliers : identifying benefits and antecedents

    NARCIS (Netherlands)

    Huttinger, Lisa

    2014-01-01

    Due to an increased competitive condition in high-skilled supply markets, buying firms increasingly find themselves competing with their rivals for the best suppliers available in a certain field. Due to the scarcity of such suppliers, the latter may not dedicate their resources equally to all

  16. The Supplier evaluation problem: the state of the art

    Directory of Open Access Journals (Sweden)

    Nazanin Ghasemy

    2018-02-01

    Full Text Available In today's competitive world, one of important factor in survival is the reduction of production cost. In the current age the companies for remaining competitive and achieving the customer satisfaction has been paid more attention to supply chain management, so that competition between companies is no longer the case, also there is between supply chains. In this regard, the supplier selection as a strategic key plays an important role in the success of companies. Selecting the right suppliers can significantly reduce the cost of purchasing and Increase the competitiveness of the organization. Decision making and supplier selection is basically a multi-criteria issue. Nevertheless, some of these criteria might be in conflict with each other. This is one of strategic importance to most organizations. The nature of such decisions is usually complex and not structured. The present paper provides a comprehensive literature review on some of articles published for supplier evaluation in recent years.

  17. Supplier evaluation in manufacturing environment using compromise ranking method with grey interval numbers

    Directory of Open Access Journals (Sweden)

    Prasenjit Chatterjee

    2012-04-01

    Full Text Available Evaluation of proper supplier for manufacturing organizations is one of the most challenging problems in real time manufacturing environment due to a wide variety of customer demands. It has become more and more complicated to meet the challenges of international competitiveness and as the decision makers need to assess a wide range of alternative suppliers based on a set of conflicting criteria. Thus, the main objective of supplier selection is to select highly potential supplier through which all the set goals regarding the purchasing and manufacturing activity can be achieved. Because of these reasons, supplier selection has got considerable attention by the academicians and researchers. This paper presents a combined multi-criteria decision making methodology for supplier evaluation for given industrial applications. The proposed methodology is based on a compromise ranking method combined with Grey Interval Numbers considering different cardinal and ordinal criteria and their relative importance. A ‘supplier selection index’ is also proposed to help evaluation and ranking the alternative suppliers. Two examples are illustrated to demonstrate the potentiality and applicability of the proposed method.

  18. A decision support tool for sustainable supplier selection in manufacturing firms

    Directory of Open Access Journals (Sweden)

    Ifeyinwa Orji

    2014-10-01

    Full Text Available Purpose: Most original equipment manufacturers (OEMs are strategically involved in supplier base rationalization and increased consciousness of sustainable development thus, reinforcing need for accurately considering sustainability in supplier selection to improve organizational performance. In real industrial case, imprecise data, ambiguity of human judgment, uncertainty among sustainability factors and the need to capture all subjective and objective criteria are unavoidable and pose huge challenge to accurately incorporate sustainability factors into supplier selection.Methodology: This study develops a model based on integrated multi- criteria decision making (MCDM methods to solve such problems. The developed model applies Fuzzy logic, DEMATEL and TOPSIS to effectively analyze the interdependencies between sustainability criteria and to select the best sustainable supplier in fuzzy environment while capturing all subjective and objective criteria. A case study is illustrated to test the proposed model in a gear manufacturing company, an OEM to provide insights and for practical applications.Findings: Results show that social factors of sustainability ranks as the most important in supplier selection. However, the most influential sustainability sub- criteria are work safety (WS and quality.Originality/Value: The model is capable of capturing all subjective and objective criteria in fuzzy environment to accurately incorporate sustainability factors in supplier selection. It is decision support tool relevant for providing insights to managers while implementing sustainable supplier selection.

  19. ANTECEDENTS OF SUPPLIER RELATION QUALITY IN THE GHANAIAN CONSTRUCTION SUPPLY CHAIN

    Directory of Open Access Journals (Sweden)

    F K Bondinuba

    2016-07-01

    Full Text Available Effective and efficient management of suppliers within a supply chain is an essential requirement for improving organisational performance within construction companies. However, factors inherent within the supply chain of supplier-buyer exchanges such as culture, politics, dependence and trust may influence supplier relationship quality (SRQ. This research therefore seeks to identify the influence that these factors have upon SRQ in the Ghanaian construction industry and develop a conceptual framework that explains the interconnectivity between them. A literature review is used to develop a conceptual framework of the antecedents influencing supplier relationship quality. Primary ‘perception’ data obtained from 152 building material suppliers is used to test the proposed model using Partial Least Squares (PLS. Findings reveal that culture, politics, dependence and trust have a significant influence on relationship quality in supply chain collaborations amongst purchasers and suppliers of building materials. While politics has a strong influence on dependence, it also generates a negative influence on SRQ and trust. The research confirms the positive effect of trust and dependence in SRQ management and extends understanding of the influence of culture and politics. Practical implications suggest that managers of building material suppliers should focus upon building trust and dependence and be discouraged from over-reliance upon politics and political affiliations as a basis for long-term relationship building.

  20. Ten-watt level picosecond parametric mid-IR source broadly tunable in wavelength

    Science.gov (United States)

    Vyvlečka, Michal; Novák, Ondřej; Roškot, Lukáscaron; Smrž, Martin; Mužík, Jiří; Endo, Akira; Mocek, Tomáš

    2018-02-01

    Mid-IR wavelength range (between 2 and 8 μm) offers perspective applications, such as minimally-invasive neurosurgery, gas sensing, or plastic and polymer processing. Maturity of high average power near-IR lasers is beneficial for powerful mid-IR generation by optical parametric conversion. We utilize in-house developed Yb:YAG thin-disk laser of 100 W average power at 77 kHz repetition rate, wavelength of 1030 nm, and about 2 ps pulse width for pumping of a ten-watt level picosecond mid-IR source. Seed beam is obtained by optical parametric generation in a double-pass 10 mm long PPLN crystal pumped by a part of the fundamental near-IR beam. Tunability of the signal wavelength between 1.46 μm and 1.95 μm was achieved with power of several tens of miliwatts. Main part of the fundamental beam pumps an optical parametric amplification stage, which includes a walk-off compensating pair of 10 mm long KTP crystals. We already demonstrated the OPA output signal and idler beam tunability between 1.70-1.95 μm and 2.18-2.62 μm, respectively. The signal and idler beams were amplified up to 8.5 W and 5 W, respectively, at 42 W pump without evidence of strong saturation. Thus, increase in signal and idler output power is expected for pump power increase.

  1. Novel Integrated Multi-Criteria Model for Supplier Selection: Case Study Construction Company

    Directory of Open Access Journals (Sweden)

    Željko Stević

    2017-11-01

    Full Text Available Supply chain presents a very complex field involving a large number of participants. The aim of the complete supply chain is finding an optimum from the aspect of all participants, which is a rather complex task. In order to ensure optimum satisfaction for all participants, it is necessary that the beginning phase consists of correct evaluations and supplier selection. In this study, the supplier selection was performed in the construction company, on the basis of a new approach in the field of multi-criteria model. Weight coefficients were obtained by DEMATEL (Decision Making Trial and Evaluation Laboratory method, based on the rough numbers. Evaluation and the supplier selection were made on the basis of a new Rough EDAS (Evaluation based on Distance from Average Solution method, which presents one of the latest methods in this field. In order to determine the stability of the model and the applicability of the proposed Rough EDAS method, an extension of the COPRAS and MULTIMOORA method by rough numbers was also performed in this study, and the findings of the comparative analysis were presented. Besides the new approaches based on the extension by rough numbers, the results are also compared with the Rough MABAC (MultiAttributive Border Approximation area Comparison and Rough MAIRCA (MultiAttributive Ideal-Real Comparative Analysis. In addition, in the sensitivity analysis, 18 different scenarios were formed, the ones in which criteria change their original values. At the end of the sensitivity analysis, SCC (Spearman Correlation Coefficient of the obtained ranges was carried out, confirming the applicability of the proposed approaches.

  2. Supplier selection based on multi-criterial AHP method

    Directory of Open Access Journals (Sweden)

    Jana Pócsová

    2010-03-01

    Full Text Available This paper describes a case-study of supplier selection based on multi-criterial Analytic Hierarchy Process (AHP method.It is demonstrated that using adequate mathematical method can bring us “unprejudiced” conclusion, even if the alternatives (suppliercompanies are very similar in given selection-criteria. The result is the best possible supplier company from the viewpoint of chosen criteriaand the price of the product.

  3. Antecedents and Consequences of Supplier Performance Evaluation Efficacy

    Science.gov (United States)

    2016-06-30

    Naval Postgraduate School supplier prior to contract award. Furthermore, the impact of deficient SPEs on the industrial supply base is unknown...identified evaluator turnover as having a potential impact on supplier evaluations over time. Therefore, is it posited that: H6: There will be a negative...Naval Postgraduate School H13 : There will be a positive relationship between communication formality and perceived accuracy. Weaknesses

  4. ABOUT INDEX EVALUATION OF MATERIAL RESOURCE SUPPLIER SELECTION

    Directory of Open Access Journals (Sweden)

    V. A. Skochinskaya

    2008-01-01

    Full Text Available The paper analyzes existing methods for evaluation of material resource supplier selection. It shows advantages and shortcomings of the present evaluation systems. The necessity for application of an index evaluation is justified in the paper. The paper contains rating (index evaluation for material resource supplier selection which is based on the application of quantitative (index tool instead of an expert (numerical evaluation. 

  5. Decision support model for selecting and evaluating suppliers in the construction industry

    Directory of Open Access Journals (Sweden)

    Fernando Schramm

    2012-12-01

    Full Text Available A structured evaluation of the construction industry's suppliers, considering aspects which make their quality and credibility evident, can be a strategic tool to manage this specific supply chain. This study proposes a multi-criteria decision model for suppliers' selection from the construction industry, as well as an efficient evaluation procedure for the selected suppliers. The model is based on SMARTER (Simple Multi-Attribute Rating Technique Exploiting Ranking method and its main contribution is a new approach to structure the process of suppliers' selection, establishing explicit strategic policies on which the company management system relied to make the suppliers selection. This model was applied to a Civil Construction Company in Brazil and the main results demonstrate the efficiency of the proposed model. This study allowed the development of an approach to Construction Industry which was able to provide a better relationship among its managers, suppliers and partners.

  6. Mixed integer linear programming model for dynamic supplier selection problem considering discounts

    Directory of Open Access Journals (Sweden)

    Adi Wicaksono Purnawan

    2018-01-01

    Full Text Available Supplier selection is one of the most important elements in supply chain management. This function involves evaluation of many factors such as, material costs, transportation costs, quality, delays, supplier capacity, storage capacity and others. Each of these factors varies with time, therefore, supplier identified for one period is not necessarily be same for the next period to supply the same product. So, mixed integer linear programming (MILP was developed to overcome the dynamic supplier selection problem (DSSP. In this paper, a mixed integer linear programming model is built to solve the lot-sizing problem with multiple suppliers, multiple periods, multiple products and quantity discounts. The buyer has to make a decision for some products which will be supplied by some suppliers for some periods cosidering by discount. To validate the MILP model with randomly generated data. The model is solved by Lingo 16.

  7. Winning the competition for supplier resources: The role of preferential resource allocation from suppliers

    NARCIS (Netherlands)

    Pulles, Niels Jaring; Veldman, Jasper; Schiele, Holger

    2016-01-01

    Purpose This paper examines the competition between buying firms for the supplier’s competitive resources. The purpose of this paper is to examine how indirect capabilities – the ability to access external resources – can help in obtaining preferential resource allocation from suppliers.

  8. Supplier's involvement and success of radical new product development in new ventures

    NARCIS (Netherlands)

    Song, Michael; Di Benedetto, Anthony

    2008-01-01

    Supplier involvement is essential to a new venture seeking to develop a radical innovation. Despite this, prior literature has not adequately addressed supplier involvement in radical innovation, nor what the antecedents to increased supplier involvement are. We build and test a conceptual model of

  9. An Integrated Model for Supplier Selection for a High-Tech Manufacturer

    Science.gov (United States)

    Lee, Amy H. I.; Kang, He-Yau; Lin, Chun-Yu

    2011-11-01

    Global competitiveness has become the biggest concern of manufacturing companies, especially in high-tech industries. Improving competitive edges in an environment with rapidly changing technological innovations and dynamic customer needs is essential for a firm to survive and to acquire a decent profit. Thus, the introduction of successful new products is a source of new sales and profits and is a necessity in the intense competitive international market. After a product is developed, a firm needs the cooperation of upstream suppliers to provide satisfactory components and parts for manufacturing final products. Therefore, the selection of suitable suppliers has also become a very important decision. In this study, an analytical approach is proposed to select the most appropriate critical-part suppliers in order to maintain a high reliability of the supply chain. A fuzzy analytic network process (FANP) model, which incorporates the benefits, opportunities, costs and risks (BOCR) concept, is constructed to evaluate various aspects of suppliers. The proposed model is adopted in a TFT-LCD manufacturer in Taiwan in evaluating the expected performance of suppliers with respect to each important factor, and an overall ranking of the suppliers can be generated as a result.

  10. Why Didn't They Ask the Supplier? The Utilization of Supplier Information and Knowledge in the Fuzzy Front End of New Product Development

    NARCIS (Netherlands)

    Kopecká, J.A.

    2013-01-01

    In today’s world of multi-component and multi-technology products, firms are obliged to seek knowledge for new product development (NPD) from external sources. Supplier firms are one such external source. The thesis aims to contribute to the development of a theory on supplier involvement in new

  11. Determination of supplier-to-supplier and lot-to-lot variability in glycation of recombinant human serum albumin expressed in Oryza sativa.

    Directory of Open Access Journals (Sweden)

    Grant E Frahm

    Full Text Available The use of different expression systems to produce the same recombinant human protein can result in expression-dependent chemical modifications (CMs leading to variability of structure, stability and immunogenicity. Of particular interest are recombinant human proteins expressed in plant-based systems, which have shown particularly high CM variability. In studies presented here, recombinant human serum albumins (rHSA produced in Oryza sativa (Asian rice (OsrHSA from a number of suppliers have been extensively characterized and compared to plasma-derived HSA (pHSA and rHSA expressed in yeast (Pichia pastoris and Saccharomyces cerevisiae. The heterogeneity of each sample was evaluated using size exclusion chromatography (SEC, reversed-phase high-performance liquid chromatography (RP-HPLC and capillary electrophoresis (CE. Modifications of the samples were identified by liquid chromatography-mass spectrometry (LC-MS. The secondary and tertiary structure of the albumin samples were assessed with far U/V circular dichroism spectropolarimetry (far U/V CD and fluorescence spectroscopy, respectively. Far U/V CD and fluorescence analyses were also used to assess thermal stability and drug binding. High molecular weight aggregates in OsrHSA samples were detected with SEC and supplier-to-supplier variability and, more critically, lot-to-lot variability in one manufactures supplied products were identified. LC-MS analysis identified a greater number of hexose-glycated arginine and lysine residues on OsrHSA compared to pHSA or rHSA expressed in yeast. This analysis also showed supplier-to-supplier and lot-to-lot variability in the degree of glycation at specific lysine and arginine residues for OsrHSA. Both the number of glycated residues and the degree of glycation correlated positively with the quantity of non-monomeric species and the chromatographic profiles of the samples. Tertiary structural changes were observed for most OsrHSA samples which

  12. Regulatory Compliance in Multi-Tier Supplier Networks

    Science.gov (United States)

    Goossen, Emray R.; Buster, Duke A.

    2014-01-01

    Over the years, avionics systems have increased in complexity to the point where 1st tier suppliers to an aircraft OEM find it financially beneficial to outsource designs of subsystems to 2nd tier and at times to 3rd tier suppliers. Combined with challenging schedule and budgetary pressures, the environment in which safety-critical systems are being developed introduces new hurdles for regulatory agencies and industry. This new environment of both complex systems and tiered development has raised concerns in the ability of the designers to ensure safety considerations are fully addressed throughout the tier levels. This has also raised questions about the sufficiency of current regulatory guidance to ensure: proper flow down of safety awareness, avionics application understanding at the lower tiers, OEM and 1st tier oversight practices, and capabilities of lower tier suppliers. Therefore, NASA established a research project to address Regulatory Compliance in a Multi-tier Supplier Network. This research was divided into three major study efforts: 1. Describe Modern Multi-tier Avionics Development 2. Identify Current Issues in Achieving Safety and Regulatory Compliance 3. Short-term/Long-term Recommendations Toward Higher Assurance Confidence This report presents our findings of the risks, weaknesses, and our recommendations. It also includes a collection of industry-identified risks, an assessment of guideline weaknesses related to multi-tier development of complex avionics systems, and a postulation of potential modifications to guidelines to close the identified risks and weaknesses.

  13. Evaluation and election of suppliers

    International Nuclear Information System (INIS)

    Zhang Guibao

    2001-01-01

    Based on the construction experience in nuclear power plants, the author presents some methods of evaluation and selection for suppliers. It is applicable to various stages of nuclear power plants, furthermore, it can be used for other buyers

  14. Joint Economic Lot Sizing Optimization in a Supplier-Buyer Inventory System When the Supplier Offers Decremental Temporary Discounts

    Directory of Open Access Journals (Sweden)

    Diana Puspita Sari

    2012-02-01

    Full Text Available This research discusses mathematical models of joint economic lot size optimization in a supplier-buyer inventory system in a situation when the supplier offers decremental temporary discounts during a sale period. Here, the sale period consists of n phases and the phases of discounts offered descend as much as the number of phases. The highest discount will be given when orders are placed in the first phase while the lowest one will be given when they are placed in the last phase. In this situation, the supplier attempts to attract the buyer to place orders as early as possible during the sale period. The buyers will respon these offers by ordering a special quantity in one of the phase. In this paper, we propose such a forward buying model with discount-proportionally-distributed time phases. To examine the behaviour of the proposed model, we conducted numerical experiments. We assumed that there are three phases of discounts during the sale period. We then compared the total joint costs of special order placed in each phase for two scenarios. The first scenario is the case of independent situation – there is no coordination between the buyer and the supplie-, while the second scenario is the opposite one, the coordinated model. Our results showed the coordinated model outperform the independent model in terms of producing total joint costs. We finally conducted a sensitivity analyzis to examine the other behaviour of the proposed model. Keywords: supplier-buyer inventory system, forward buying model, decremental temporary discounts, joint economic lot sizing, optimization.

  15. Utility Expectations for Human Performance and Safety Culture in the Supplier Community

    International Nuclear Information System (INIS)

    Clewett, L. K.

    2016-01-01

    Canadian NPPs, like many others around the world, make use of suppliers for the design and execution of major projects, and to support on-going inspection and maintenance activities. The work performed by suppliers today represents a significant portion of the work performed at utility NPPs, and, at times, can even exceed the work performed by utility staff. It is imperative for both the utility and the supplier work forces to work in collaboration to ensure that the probability of consequential errors impacting plant safety or contributing to broader enterprise risk is kept very low. An important element for keeping the risk low is for utilities to work with their suppliers to develop a high degree of confidence that the supplier workforce is performing to the same standards of human performance and safety culture as its own staff. This paper will provide a senior utility executive’s expectations and perspective on achieving excellence in supplier human performance and safety culture. (author)

  16. The Nuclear Suppliers Group: A multilateral arrangement devoted to supplier coordination

    International Nuclear Information System (INIS)

    Dedik, T.; Thorne, C.E.; Goorevich, R.S.

    1995-01-01

    When the then-26 adherents to the Nuclear Suppliers Group (NSG) Guidelines met for the first time in more than 13 years in The Hague in April 1991 it began a new and dynamic process for coordinating the full range of nuclear supplier issues. In less than four years the NSG has expanded its membership to 31 countries and has implemented major changes to its Guidelines and commodity control lists. Enhancements to the Regime agreed to by the Group since its reinvigoration include the adoption of controls on nuclear-related-dual-use equipment, materials and technology; the requirements for a recipient country to have an agreement with the International Atomic Energy Agency calling for safeguards on its entire nuclear program, both now and in the future; a major expansion of the Trigger List (the list of commodities which ''trigger'' safeguards as a condition of supply) to clarify and add detail to the controlled commodities; comparable controls on technologies associated with Trigger List items; and ''fixes'' to the Guidelines to control retransfers and exports to countries with suspect nonproliferation credentials. This paper provides a comprehensive overview of the NSG and discusses in detail the past, present and future work of the Group

  17. Exploring the link between relationship quality and loyalty: Gaining Insights into Manufacturer-Supplier Relationships

    OpenAIRE

    Lemke, Fred

    2003-01-01

    Manufacturers across industry sectors are gradually reducing their supplier base. Consequently, suppliers need an appropriate strategy to ensure preferred supplier status. It is argued, that `softer' - or more intangible - relationship factors potentially have the power to distinguish suppliers. But what are the intangible factors? How does a customer value them? Do they have an impact on the supplier selection process at all? Questions like these describe an area that ha...

  18. Constructing a Watts-Strogatz network from a small-world network with symmetric degree distribution.

    Directory of Open Access Journals (Sweden)

    Mozart B C Menezes

    Full Text Available Though the small-world phenomenon is widespread in many real networks, it is still challenging to replicate a large network at the full scale for further study on its structure and dynamics when sufficient data are not readily available. We propose a method to construct a Watts-Strogatz network using a sample from a small-world network with symmetric degree distribution. Our method yields an estimated degree distribution which fits closely with that of a Watts-Strogatz network and leads into accurate estimates of network metrics such as clustering coefficient and degree of separation. We observe that the accuracy of our method increases as network size increases.

  19. Constructing a Watts-Strogatz network from a small-world network with symmetric degree distribution.

    Science.gov (United States)

    Menezes, Mozart B C; Kim, Seokjin; Huang, Rongbing

    2017-01-01

    Though the small-world phenomenon is widespread in many real networks, it is still challenging to replicate a large network at the full scale for further study on its structure and dynamics when sufficient data are not readily available. We propose a method to construct a Watts-Strogatz network using a sample from a small-world network with symmetric degree distribution. Our method yields an estimated degree distribution which fits closely with that of a Watts-Strogatz network and leads into accurate estimates of network metrics such as clustering coefficient and degree of separation. We observe that the accuracy of our method increases as network size increases.

  20. Advanced qualification of pharmaceutical excipient suppliers by multiple analytics and multivariate analysis combined.

    Science.gov (United States)

    Hertrampf, A; Müller, H; Menezes, J C; Herdling, T

    2015-11-10

    Pharmaceutical excipients have different functions within a drug formulation, consequently they can influence the manufacturability and/or performance of medicinal products. Therefore, critical to quality attributes should be kept constant. Sometimes it may be necessary to qualify a second supplier, but its product will not be completely equal to the first supplier product. To minimize risks of not detecting small non-similarities between suppliers and to detect lot-to-lot variability for each supplier, multivariate data analysis (MVA) can be used as a more powerful alternative to classical quality control that uses one-parameter-at-a-time monitoring. Such approach is capable of supporting the requirements of a new guideline by the European Parliament and Council (2015/C-95/02) demanding appropriate quality control strategies for excipients based on their criticality and supplier risks in ensuring quality, safety and function. This study compares calcium hydrogen phosphate from two suppliers. It can be assumed that both suppliers use different manufacturing processes. Therefore, possible chemical and physical differences were investigated by using Raman spectroscopy, laser diffraction and X-ray powder diffraction. Afterwards MVA was used to extract relevant information from each analytical technique. Both CaHPO4 could be discriminated by their supplier. The gained knowledge allowed to specify an enhanced strategy for second supplier qualification. Copyright © 2015 Elsevier B.V. All rights reserved.

  1. Suppliers of petrol to the UK retail market - end 1994

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Suppliers of petrol to the UK retail market (as at 31.12.94) are tabulated, with brand names and company names, areas of operation, and total numbers of retail petrol outlets displaying brand names, self-service sites, company-owned sites and outlets retailing Derv given. Statistics resulting from a retail marketing survey (1995) are listed and cover UK petrol sites from 1985-1994; motorway brands; a regional breakdown of petrol and derv outlets; UK outlets retailing derv; average UK prices for petrol and derv per litre; percentage of petrol sites per company (1994); number of company petrol sites as a percentage of total; number of outlets at hypermarkets/supermarkets; and vapour recovery sites. (UK)

  2. A model of the supplier involvement in the product innovation

    Directory of Open Access Journals (Sweden)

    Kumar Manoj

    2017-01-01

    Full Text Available In this paper we examine the product innovation in a supply chain by a supplier and derive a model for a supplier’s product innovation policy. The product innovation of a supplier can contribute to the long-term competitiveness for the supply chain, and as it is for many supply chains a major factor, it should be considered in the development of strategies for a supplier. Here, we evaluate the effectiveness of supplier product innovation as a strategic tool to enhance the competitiveness and viability of supply chain. This paper explores the dynamic research performance of a supplier with endogenous time preference under a given arrangement of product innovation. We find that the optimal effort level and the achieved product innovation obey a saddle point path, or show tremendous fluctuations even without introducing the stochastic nature of product innovative activity. We also find that the fluctuation frequency is largely dependent both on the supplier’s characteristics such as supplier’s product innovative ability and on the nature of product innovation process per se. Short-run analyses are also made on the effect of supply chain cooperation in the product innovation process.

  3. Supplier relationship management – anathema for the South African public procurement sector

    Directory of Open Access Journals (Sweden)

    Micheline J. Naude

    2013-07-01

    Full Text Available The public sector is recognised as being one of the most important customer groups for many suppliers and service providers because of the volume of public expenditure. Supplier relationship management (SRM is a necessary tool on which businesses in the public and private sectors rely. However, in the South African public sector, despite the intention to boost service delivery through efficient and effective supplier-management processes, the development of sound supplier relationships is a challenge. The purpose of this article is to provide insight into supplier-relationship challenges and to suggest a framework for implementing SRM in the South African public sector. The research presented is based on a survey using both descriptive and exploratory research. Data were gathered through semi-structured interviews with 15 participants at eight institutions in KwaZulu-Natal. Purposive sampling techniques were used. The findings reveal that the main supplier-related challenges that handicap procurement practices in the province are a lack of experience, a lack of affirmable suppliers, threats and bribes, a lack of integrity, an inability to meet delivery deadlines and quality issues. The findings further reveal that supplier relationships in the public sector are of a transactional nature. A five-stage framework is therefore recommended for implementing SRM in the South African public sector and in order to assist government procurement officials to reap the benefits of SRM whilst supporting the requirements of public-sector procurement.

  4. The Ideal Criteria of Supplier Selection for SMEs Food Processing Industry

    OpenAIRE

    Ramlan Rohaizan; Engku Abu Bakar Engku Muhammad Nazri; Mahmud Fatimah; Ng Hooi Keng

    2016-01-01

    Selection of good supplier is important to determine the performance and profitability of SMEs food processing industry. The lack of managerial capability on supplier selection in SMEs food processing industry affects the competitiveness of SMEs food processing industry. This research aims to determine the ideal criteria of supplier for food processing industry using Analytical Hierarchy Process (AHP). The research was carried out in a quantitative method by distributing questionnaires to 50 ...

  5. On the relationship between supplier integration and time-to-market

    NARCIS (Netherlands)

    Perols, J.; Zimmermann, C.; Kortmann, S.

    2013-01-01

    Recent operations management and innovation management research emphasizes the importance of supplier integration. However, the empirical results as to the relationship between supplier integration and time-to-market are ambivalent. To understand this important relationship, we incorporate two major

  6. Time Delay and Long-Range Connection Induced Synchronization Transitions in Newman-Watts Small-World Neuronal Networks

    Science.gov (United States)

    Qian, Yu

    2014-01-01

    The synchronization transitions in Newman-Watts small-world neuronal networks (SWNNs) induced by time delay and long-range connection (LRC) probability have been investigated by synchronization parameter and space-time plots. Four distinct parameter regions, that is, asynchronous region, transition region, synchronous region, and oscillatory region have been discovered at certain LRC probability as time delay is increased. Interestingly, desynchronization is observed in oscillatory region. More importantly, we consider the spatiotemporal patterns obtained in delayed Newman-Watts SWNNs are the competition results between long-range drivings (LRDs) and neighboring interactions. In addition, for moderate time delay, the synchronization of neuronal network can be enhanced remarkably by increasing LRC probability. Furthermore, lag synchronization has been found between weak synchronization and complete synchronization as LRC probability is a little less than 1.0. Finally, the two necessary conditions, moderate time delay and large numbers of LRCs, are exposed explicitly for synchronization in delayed Newman-Watts SWNNs. PMID:24810595

  7. A multiple criteria decision making technique for supplier selection and inventory management strategy: A case of multi-product and multi-supplier problem

    Directory of Open Access Journals (Sweden)

    Morteza Parhizkari

    2013-07-01

    Full Text Available Selection of an appropriate supplier along with planning a good inventory system has become an area of open research for the past few years. In this paper, we present a multi objective decision making supplier and inventory management model where two objectives including the quality and offering price of supplier are minimized, simultaneously. The proposed model is formulated as mixed integer programming and it is converted into an ordinary single objective function using Lp-Norm. In order to find efficient solution, we use NSGA-II as meta-heuristic technique and the performance of the proposed model is examined using some instances. The preliminary results indicate that both Lp-Norm and NSGA-II methods can be used to handle problems in various sizes.

  8. Fuzzy Multicriteria ABC Supplier Classification in Global Supply Chain

    Directory of Open Access Journals (Sweden)

    Petar Kefer

    2016-01-01

    Full Text Available The determination of the optimal purchasing strategy in enterprise that is a part of global supply chain could be performed in two steps. In step one, a classification of potential suppliers is performed in order to determine the optimal portfolio of suppliers. This is delivered by using the fuzzy multicriteria proposed ABC classification method. Uncertainties in relative importance of criteria and their values are described by linguistic expressions. Modelling of linguistic expressions is based on the fuzzy sets theory. In the second step, ranking of optimal portfolio of suppliers is performed by using the modified ELECTRE method. The obtained results represent valuable input for determining the long time purchasing strategy and building partnership with the best suppliers. The developed two-step model is verified on real life data. The obtained results indicate good compliance with the opinions management in this type of industry. It is worth to mention that the proposed model can be easily extended and adopted to the analysis of other issues of management which could be applicable in different research areas.

  9. Supplier Selection Process Using ELECTRE I Decision Model and an Application in the Retail Sector

    Directory of Open Access Journals (Sweden)

    Oğuzhan Yavuz

    2013-12-01

    Full Text Available Supplier selection problem is one of the main topic for the today’s businesses. The supplier selection problem within the supply chain management activities is very important for the businesses, particularly operating in the retail sector. Thus, in this study, the supplier selection problem was discussed in order of importance between energy drinks suppliers of food business in the retail sector. Costs, delivery, quality and flexibility variables were used to select suppliers, and ELECTRE I Method, one of the multiple decision methods, was used to ranking suppliers according to this variables. Which suppliers are more important for the food company was determined by ranking suppliers according to computing net superior values and net inferior values. Results obtained werepresented in tables and certain steps

  10. The influence of the sustainability agenda on buyer-supplier relationships

    DEFF Research Database (Denmark)

    Jørsfeldt, Liliyana Makarowa; Wæhrens, Brian Vejrum

    2013-01-01

    The positive effect of supplier-buyer relationships on supply chain performance has al-ready been supported by previous studies. Yet, little empirical research has explored how the sustainability agenda influences these relationships. Thus, this study investi-gates how supplier-buyer relationships...

  11. Multi-Criteria Decision Making For Determining A Simple Model of Supplier Selection

    Science.gov (United States)

    Harwati

    2017-06-01

    Supplier selection is a decision with many criteria. Supplier selection model usually involves more than five main criteria and more than 10 sub-criteria. In fact many model includes more than 20 criteria. Too many criteria involved in supplier selection models sometimes make it difficult to apply in many companies. This research focuses on designing supplier selection that easy and simple to be applied in the company. Analytical Hierarchy Process (AHP) is used to weighting criteria. The analysis results there are four criteria that are easy and simple can be used to select suppliers: Price (weight 0.4) shipment (weight 0.3), quality (weight 0.2) and services (weight 0.1). A real case simulation shows that simple model provides the same decision with a more complex model.

  12. Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan

    Science.gov (United States)

    Jardim, Kevin P.

    Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.

  13. Influence of innovation in the customer-supplier re lationship on competitive advantage

    Directory of Open Access Journals (Sweden)

    Božidar Lenarčič

    2012-10-01

    Full Text Available RQ: The excellence of a company is also the result of the relationship to the supplier. A good relationship is shown on the results in developing innovative ideas. In this study we were interested in the relations between the buyer and the supplier and how this effects their innovation development, which is later expressed as a competitive advantage, and if this relation effectson the creation of innovation ideas.Purpose: The purpose is to explore the relationship between suppliers and customers, their common innovative activity and the impact of joint innovation ideas in competitive advantage.Method: A literature review and a quantitative analysis with an opinion questionnaire was used in this study. Data analysis was carried out with frequency statistics and χ2-test.Results: The result shows that the relationship between buyers and suppliers has a greater impact on competitive advantage than the number of innovations.Organization: The research study impacts the customer-supplier relationship, mutual expectations and common creation of innovative ideas to increase competitive advantage. The results will be informative in adapting decisions and measures in strengthening the relationship for the creation of an innovative environment withininterpersonal relationships.Society: Society is aware of the importance of customer-supplier relations. Society will be able to obtain information on the degree of the customer-supplier mutual relationship in collaborating and developing innovative ideas, the level of awareness in the importance of innovation in the mutual relation of creating a competitive advantage.Originality: The originality of the research is to learn aboutthe impact of customer-supplier relations and on innovation as one of an organization’s competitive advantages.Limitations: The research is limited to one company and a smaller sample-size of suppliers in an organization.

  14. ALICE honours two Italian suppliers

    CERN Multimedia

    2006-01-01

    During the ALICE week held in Bologna from 19 to 23 June, the Collaboration recognized two of its top suppliers. From left to right: Robert Terpin (MIPOT), Pier Luigi Bellutti (ITC), Andrea Zanotti, President of ITC, Luciano Bosisio (Trieste University), Gennady Zinovjev (Kiev), Catherine Decosse (CERN), Lodovico Riccati, ALICE Collaboration Board Chair (INFN Torino), Paolo Giubellino (INFN Torino), Mario Zen, Director of ITC, Maurizio Boscardin (ITC), Paolo Tonella (ITC), Jurgen Schukraft, ALICE Spokesperson (CERN), Giacomo Vito Margagliotti (Trieste University), Nevio Grion (INFN Trieste), Marco Bregant (INFN Trieste). Front row from left to right: Paolo Traverso (ITC), Federico Carminati, ALICE Computing Project Leader (CERN), and Jean-Robert Lutz, ITS-SSD Project leader (IPHC Strasbourg). It is in the picturesque city of Bologna that the ALICE Collaboration has rewarded two Italian suppliers, Istituto Trentino di Cultura ITC-irst (Trento) and MIPOT (Cormons), both involved in the construction of the Sili...

  15. 47 CFR 68.350 - Revocation of Supplier's Declaration of Conformity.

    Science.gov (United States)

    2010-10-01

    ... Conformity. 68.350 Section 68.350 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON... Terminal Equipment Approval § 68.350 Revocation of Supplier's Declaration of Conformity. (a) The Commission may revoke any Supplier's Declaration of Conformity for cause in accordance with the provisions of...

  16. Supplier Risk Assessment Based on Best-Worst Method and K-Means Clustering: A Case Study

    Directory of Open Access Journals (Sweden)

    Merve Er Kara

    2018-04-01

    Full Text Available Supplier evaluation and selection is one of the most critical strategic decisions for developing a competitive and sustainable organization. Companies have to consider supplier related risks and threats in their purchasing decisions. In today’s competitive and risky business environment, it is very important to work with reliable suppliers. This study proposes a clustering based approach to group suppliers based on their risk profile. Suppliers of a company in the heavy-machinery sector are assessed based on 17 qualitative and quantitative risk types. The weights of the criteria are determined by using the Best-Worst method. Four factors are extracted by applying Factor Analysis to the supplier risk data. Then k-means clustering algorithm is applied to group core suppliers of the company based on the four risk factors. Three clusters are created with different risk exposure levels. The interpretation of the results provides insights for risk management actions and supplier development programs to mitigate supplier risk.

  17. SUPPLIER EVALUATION AND SELECTION: CASE OF AN AUTOMOTIVE SPARE-PARTS SUPPLIER

    OpenAIRE

    Oflac, Bengu Sevil

    2015-01-01

     The main aim of this study is to conduct a current state analysis for a leading original and spare parts producer operating in automobile industry. In the focused company, due to having some problems about purchasing process, there was a need for reviewing and restructuring supplier evaluation mechanism. In this perspective, based on the results of qualitative techniques conducted, reasons for poor evaluation systems were found. As a contribution to practice, in line with the needs of compan...

  18. Supplier relationship management leverages intellectual capital for increased competitive advantage

    Directory of Open Access Journals (Sweden)

    C. R. Van Zyl

    2005-12-01

    Full Text Available The main purpose of this article is to demonstrate how supplier relationship management (SRM enables the capture and creation of intellectual capital, thereby attaining and sustaining a strategic competitive advantage and increasing supply chain profitability. In order to achieve this purpose, a large part of the article is devoted to exploring the relatively new and unknown field of SRM. It is shown that an organisation must possess a thorough understanding of good supplier characteristics and of the drivers, benefits and requirements for the successful implementation of SRM, in order to enable that organisation to leverage their supplier relationships to ensure the capture of supplier expertise, patents, experiences etc. (i.e. their intellectual capital. The article then explores how the integration of technology in SRM applications can improve the efficiency of supplier collaboration and intellectual capital capture and creation. It is then demonstrated how efficient and collaborative supplier relationships improve supply chain profitability and competitiveness. Lastly, the article explores the implementation pitfalls and trends of SRM that must be constantly considered and monitored by an organisation in order to continually capture and create intellectual capital and reap the full benefits of SRM. This exploration involved an examination of contemporary literature, theories and business cases and subsequently revealed that SRM is a vital discipline/philosophy that must be implemented by any organisation wishing to achieve greater supply chain efficiency and competitiveness. This competitiveness can only be achieved through the mutual unlocking, sharing and leveraging of intellectual capital.

  19. Suppliers perform balancing act

    International Nuclear Information System (INIS)

    Roggen, M.

    2004-01-01

    Firms that supply network operators in the Netherlands are in a difficult position. Liberalisation emphasises increasing the efficiency and maximising the use of the infrastructure, which is a shift in focus from which suppliers have little to gain. At the same time, their products are expected to meet higher quality standards. Coping with changing customer expectations calls for agility and flexibility [nl

  20. NegaWatt 2011-2050 scenario - Hypotheses and method. Technical report, May 2014

    International Nuclear Information System (INIS)

    2014-05-01

    This report proposes an analysis of the negaWatt 2011 scenario. It describes in detail the methodology adopted to elaborate this prospective scenario, and presents the major part of the hypotheses which structure this scenario. A first part presents the approach and methodology (constraints, scenario, model). The second part addresses the issue of energy saving and energy efficiency through a sector-based analysis (housing and office building, transports, industrial and agricultural production). The third part studies the substitution by renewable energies through a supply analysis: energy production based on biomass, renewable energies, and fissile and fossil energies. It outlines the major role of grids in the supply-demand balance. The results of the negaWatt 2011 scenario are presented in terms of final energy, primary energies, and impact on greenhouse gas emissions. Hypotheses and results related to the different sectors (building, transports, industry and agriculture, energy production) are given in appendix

  1. Cooperation Between Suppliers and Retail Chains in Developing Systemic Products

    Directory of Open Access Journals (Sweden)

    Katarzyna Bilińska-Reformat

    2016-01-01

    Full Text Available Seeking a competitive advantage, retail chains develop systemic products. Introducing systemic products to retailers' offer requires establishment of close cooperation with their suppliers. In the paper the assumption has been made that offering systemic products makes the offer more attractive for customer. It is also reason for development of cooperation between retail chains and suppliers. Selected commercial enterprises were research objects in the study. Analyses included in the paper concern the years between 2009 and 2015. Research methods: critical analysis of the literature, results of own research method concerning cooperation between retail chains and suppliers, and the case research method.

  2. Supplier integration in product development: A matter of designing the project structure

    Directory of Open Access Journals (Sweden)

    Mike Danilovic

    2007-11-01

    Full Text Available In product development close collaboration between systems integrators and suppliers is important. The purpose of this article is to investigate the impact of the work breakdown structure (WBS and work packages (WPs in product development on the possibility of carrying through the strategy of supplier involvement into collaborative practice and to investigate how supplier involvement can be improved by altering the design of collaborative WBS and WP structures. Dependence Structure Matrix (DSM is introduced in order to analyse, visualise and manage interdependencies, in terms of information exchange between the systems integrator and supplier. This article shows how DSM can support the alternative design of integrated and collaborative WBS and integrated WPs following the logic of dependencies and the flow of information in order to support a strategy focusing on integration of suppliers on project and team level.

  3. Application of integrated QFD and fuzzy AHP approach in selection of suppliers

    Directory of Open Access Journals (Sweden)

    Bojana Jovanović

    2014-10-01

    Full Text Available Supplier selection is a widely considered issue in the field of management, especially in quality management. In this paper, in the selection of suppliers of electronic components we used the integrated QFD and fuzzy AHP approaches. The QFD method is used as a tool for translating stakeholder needs into evaluating criteria for suppliers. The fuzzy AHP approach is used as a tool for prioritizing stakeholders, stakeholders’ requirements, evaluating criteria and, finally, for prioritizing suppliers. The paper showcases a case study of implementation of the integrated QFD and fuzzy AHP approaches in the selection of the electronic components supplier in one Serbian company that produces electronic devices. Also presented is the algorithm of implementation of the proposed approach. To the best of our knowledge, this is the first implementation of the proposed approach in a Serbian company.

  4. The Planck Constant, the International System of Units, and the 2012 North American Watt Balance Absolute Gravity Comparison

    Science.gov (United States)

    Newell, D. B.

    2012-12-01

    As outlined in Resolution 1 of the 24th Meeting of the General Conference on Weights and Measures (CGPM) on the future revision of the International System of Units (SI) [1], the current four SI base units the kilogram, the ampere, the kelvin and the mole, will be redefined in terms of invariants of nature. The new definitions will be based on fixed numerical values of the Planck constant (h), the elementary charge (e), the Boltzmann constant (k), and the Avogadro constant (NA), respectively. While significant progress has been made towards providing the necessary experimental results for the redefinition, some disagreement among the relevant data remain. Among the set of discrepant data towards the redefinition of the SI are the determinations of the Planck constant from the National Institute of Standards and Technology (NIST) watt balance [2] and the recent result from the National Research Council Canada (NRC) watt balance [3], with the discrepancy of roughly 2.5 parts in 107 being significantly outside the reported uncertainties. Of major concern is that the watt balance experiment is seen as a key component of a mise en pratique for the new kilogram definition, once such a redefinition takes place. The basic operational principle of a watt balance relates the Planck constant to mass, length, and time through h = mgvC, where m is the mass of an artifact mass standard, g is the local acceleration of gravity, v is a velocity, and C is a combination of frequencies and scalar constants. With the total uncertainty goal for the watt balance on the order of a few parts in 108, g needs to be determined at the location of the mass standard to parts in 109 such that its uncertainty is negligible in the final watt balance result. NIST and NRC have formed a collaborative effort to reconcile the relevant discrepant data and provide further progress towards preparing and testing a mise en pratique for the new kilogram definition. As an initial step, direct comparisons of

  5. Dynamic supplier selection problem considering full truck load in probabilistic environment

    Science.gov (United States)

    Sutrisno, Wicaksono, Purnawan Adi

    2017-11-01

    In this paper, we propose a mathematical model in a probabilistic dynamic optimization to solve a dynamic supplier selection problem considering full truck load in probabilistic environment where some parameters are uncertain. We determine the optimal strategy for this problem by using stochastic dynamic programming. We give some numerical experiments to evaluate and analyze the model. From the results, the optimal supplier and the optimal product volume from the optimal supplier were determined for each time period.

  6. Value for value : the dynamics of supplier value in collaborative new product development.

    NARCIS (Netherlands)

    Smals, R.G.M.; Smits, A.A.J.

    2012-01-01

    Suppliers are recognized as an important source of innovation. Research into supplier involvement in new product development has shown that benefits can potentially be reaped by customers. However, a relatively unexplored precondition is the willingness of suppliers to invest in their customers’

  7. A nonlinear q-voter model with deadlocks on the Watts-Strogatz graph

    Science.gov (United States)

    Sznajd-Weron, Katarzyna; Michal Suszczynski, Karol

    2014-07-01

    We study the nonlinear $q$-voter model with deadlocks on a Watts-Strogats graph. Using Monte Carlo simulations, we obtain so called exit probability and exit time. We determine how network properties, such as randomness or density of links influence exit properties of a model.

  8. PENGAMBILAN KEPUTUSAN UNTUK PEMILIHAN SUPPLIER BAHAN BAKU DENGAN PENDEKATAN ANALYTIC HIERARCHY PROCESSDI PR PAHALA SIDOARJO

    Directory of Open Access Journals (Sweden)

    Miftakhul Jannah

    2016-11-01

    Full Text Available Choosing right raw material supplier(s is essential to reassure raw material of good quality. There are several approcahes being used for supplier selection, including method of selection and evaluation system, and models. This study aimed at evaluating and developing raw material supplier selection method in PR Pahala, Sidoarjo, Indonesia, a cigarrette company. The model used in this study was QCDFR (Quality, Cost, Delivery, Flexibility, Responsiveness model. Several stages employed during development of the model were: establishing criterion, performance indicator of supplier of each criterion, alternative, criterion weight, performance indicator of supplier alternative and, making of spread sheet and reporting of evaluation election of supplier. There are several main suppliers of dried tobacco to be evaluated in this study, which come from four different areas, namely Madura, Bondowoso, Tulungagung, and Malang. The model developed should be able to assisst the company in the supplier selection to achieve supplier of the best performance.The most important criterion factor of supplier selection in PR Pahala is criterion of quality which had highest weight of 0,373, followed by cost of 0,266, criterion of responsivenessof 0,156, criterion of delivery of 0,128, criterion of flexibility of 0,077. Moreover, weight of selection alternative according to area were Madura with 0,311, Tulungagung 0,234, Bondowoso 0,253, Malang 0,202.

  9. Strategic Wholesale Pricing for an Incumbent Supplier Facing with a Competitive Counterpart

    Directory of Open Access Journals (Sweden)

    Jianwu Sun

    2014-01-01

    Full Text Available We introduce a wholesale pricing strategy for an incumbent supplier facing with a competitive counterpart. We propose a profit function which considers both the present loss and future loss from a wholesale price and then study the optimal wholesale prices for different objectives about this profit function for the incumbent supplier. First, we achieve an optimal wholesale price for the incumbent supplier to maximize his expected profit. Then, to reduce the risk originating from the fluctuation in the competitive supplier’s wholesale price, we integrate the conditional value-at-risk (CVaR measure in financial risk management into this study and derive an optimal wholesale price to maximize CVaR about profit for the incumbent supplier. Besides, the properties of the two optimal wholesale prices are discussed. Finally, some management insights are suggested for the incumbent supplier in a competitive setting.

  10. Unveiling the importance of being a preferred customer in order to develop innovations with suppliers

    NARCIS (Netherlands)

    Schiele, Holger

    2010-01-01

    Purpose of the paper and literature addressed: The purpose of this research is to understand why early supplier integration in new product development repeatedly fails and how to select the right suppliers to avoid supplier obstructionism. We review the literature on early supplier integration.

  11. Building resilient relationships with suppliers in the B2B market

    Directory of Open Access Journals (Sweden)

    Wieteska Grażyna

    2016-12-01

    Full Text Available The growing uncertainty of business environment that negatively influences the contemporary supply chains is one of the major challenges for today’s managers. The literature recommends the development of resistant supply chains, defining them as adaptive and flexible. However, there are a few scientific publications that directly link to the area of Supplier Relationship Management in this regard. The article aims to answer the question what is the flexibility and adaptability and how to perceive these two characteristics in terms of an upstream supply chain. The observations indicate that building relationships resistant to these disruptions with suppliers includes the formulation of appropriate strategies towards both the suppliers and the purchasing process. Their choice depends on the source of uncertainty and the costs of switching the suppliers

  12. A concurrent optimization model for supplier selection with fuzzy quality loss

    International Nuclear Information System (INIS)

    Rosyidi, C.; Murtisari, R.; Jauhari, W.

    2017-01-01

    The purpose of this research is to develop a concurrent supplier selection model to minimize the purchasing cost and fuzzy quality loss considering process capability and assembled product specification. Design/methodology/approach: This research integrates fuzzy quality loss in the model to concurrently solve the decision making in detailed design stage and manufacturing stage. Findings: The resulted model can be used to concurrently select the optimal supplier and determine the tolerance of the components. The model balances the purchasing cost and fuzzy quality loss. Originality/value: An assembled product consists of many components which must be purchased from the suppliers. Fuzzy quality loss is integrated in the supplier selection model to allow the vagueness in final assembly by grouping the assembly into several grades according to the resulted assembly tolerance.

  13. A concurrent optimization model for supplier selection with fuzzy quality loss

    Energy Technology Data Exchange (ETDEWEB)

    Rosyidi, C.; Murtisari, R.; Jauhari, W.

    2017-07-01

    The purpose of this research is to develop a concurrent supplier selection model to minimize the purchasing cost and fuzzy quality loss considering process capability and assembled product specification. Design/methodology/approach: This research integrates fuzzy quality loss in the model to concurrently solve the decision making in detailed design stage and manufacturing stage. Findings: The resulted model can be used to concurrently select the optimal supplier and determine the tolerance of the components. The model balances the purchasing cost and fuzzy quality loss. Originality/value: An assembled product consists of many components which must be purchased from the suppliers. Fuzzy quality loss is integrated in the supplier selection model to allow the vagueness in final assembly by grouping the assembly into several grades according to the resulted assembly tolerance.

  14. Green supplier selection and order allocation in a low-carbon paper industry

    DEFF Research Database (Denmark)

    Govindan, Kannan; Sivakumar, R.

    2016-01-01

    is to engage the case company with their supplier networks to diminish the greenhouse gases (GHG) emissions and cost in their production process. It proposes a model to support the selection of the best green supplier and an allocation of order among the potential suppliers. The proposed model contains a two......-phase hybrid approach. The first phase presents the rating and selection of potential suppliers by considering economics (cost), operational factors (quality and delivery), and environmental criteria (recycle capability and GHG emission control) using Fuzzy Technique for Order of Preference by Similarity....... Finally, a conclusion and a suggested direction of future research are introduced....

  15. 2010 Defense Logistics Agency Enterprise Supplier Conference and Exhibition

    Science.gov (United States)

    2010-08-25

    bakeries • Soda distributors • Ration assemblers and component suppliers • Food service equipment suppliers Focus on Industry WARFIGHTER FOCUSED...CHAIN LEADERSHIP 18 • Bread & Dairy – Unique market… regionally focused based on local bakeries and dairy plants – Many local businesses with limited...do) who not to buy from. • IDs buy many components directly from franchised distribution. Poor reflection of their customers. • Franchised

  16. The Establishment of a Green Supplier Selection and Guidance Mechanism with the ANP and IPA

    Directory of Open Access Journals (Sweden)

    Chih-Chao Chung

    2016-03-01

    Full Text Available This study aims to establish a green supplier selection and guidance mechanism by integrating the features of an ANP (Analytic Network Process and an IPA (Importance–Performance Analysis to achieve sustainable management for green supply chains. Using an expert survey, this study developed green supplier selection criteria. It adopted an ANP, which allows for interdependencies and feedback between the various criteria, to select competitive green suppliers. Then, it used an IPA, which can analyze the criteria’s significance and performance levels, to provide green suppliers with direction for guidance and improvements. The green supplier selection and guidance mechanism featuring an ANP and IPA is thus established and validated through case studies. The research results showed the following: (1 the green supplier selection criteria comprise a total of 11 performance evaluation criteria from the three dimensions of operation, competence, and environmental consciousness; (2 as shown by the APN evaluation results, environmental benefits, environmental regulations, finance, technological competence, and delivery time are the top five among the overall green criteria of the company; the performance of the various suppliers is thus arranged in order, and the most competitive supplier is selected; (3 an IPA is used to analyze the criteria’s significance and supplier performance levels and to provide the suppliers with suggestions on priority improvements, including implementing the requirements in the environmental regulations, establishing comprehensive financial management procedures, improving corporate technological competence, and consolidating customer service; (4 it is suggested that an ANP and IPA should be integrated in the applications, which could simplify the green supplier selection and guidance mechanisms and increase the efficiency of supplier management, thus creating a three-win situation for the clients, the company, and the

  17. Profiles of Major Suppliers to the Automotive Industry : Vol. 5. Multinational Automotive Parts and Components Suppliers

    Science.gov (United States)

    1982-08-01

    This study summarizes extensive information collected over a two-year period (October 1978 to October 1980) on suppliers of parts and components, materials, and machine tools to the automotive industry in the United States. The objective of the study...

  18. Profiles of Major Suppliers to the Automotive Industry : Vol. 6. Foreign Automotive Parts and Components Suppliers.

    Science.gov (United States)

    1982-08-01

    This study summarizes extensive information collected over a two-year period (October 1978 to October 1980) on suppliers of parts and components, materials, and machine tools to the automotive industry in the United States. The objective of the study...

  19. Rethinking the Centrality of Customer and Supplier Interaction in Innovation

    DEFF Research Database (Denmark)

    Johnsen, Thomas; Phillips, W.; Caldwell, N.

    This paper evaluates the assumption that interaction within customer-supplier relationships is alwaysthe pivotal point for innovation. It argues that the relevance of customer and supplier relationshipsdepends on the nature and maturity of the technology being developed, thus exploring...... the potentialvariation in customer-supplier interactions during different phases of the innovation life cycle. Thepaper commences with a brief introduction to the literature and then uses the findings from anexploratory set of interviews to illustrate the premise of the paper. The paper concludes with adiscussion...... of the implications of the findings and outlines the plans for the next stage of the research.Keywords: technology, interaction, relationships, innovation life cycle...

  20. Application of a naive Bayesians classifiers in assessing the supplier

    Directory of Open Access Journals (Sweden)

    Mijailović Snežana

    2017-01-01

    Full Text Available The paper considers the class of interactive knowledge based systems whose main purpose of making proposals and assisting customers in making decisions. The mathematical model provides a set of examples of learning about the delivered series of outflows from three suppliers, as well as an analysis of an illustrative example for assessing the supplier using a naive Bayesian classifier. The model was developed on the basis of the analysis of subjective probabilities, which are later revised with the help of new empirical information and Bayesian theorem on a posterior probability, i.e. combining of subjective and objective conditional probabilities in the choice of a reliable supplier.

  1. A hybrid agent-based computational economics and optimization approach for supplier selection problem

    Directory of Open Access Journals (Sweden)

    Zahra Pourabdollahi

    2017-12-01

    Full Text Available Supplier evaluation and selection problem is among the most important of logistics decisions that have been addressed extensively in supply chain management. The same logistics decision is also important in freight transportation since it identifies trade relationships between business establishments and determines commodity flows between production and consumption points. The commodity flows are then used as input to freight transportation models to determine cargo movements and their characteristics including mode choice and shipment size. Various approaches have been proposed to explore this latter problem in previous studies. Traditionally, potential suppliers are evaluated and selected using only price/cost as the influential criteria and the state-of-practice methods. This paper introduces a hybrid agent-based computational economics and optimization approach for supplier selection. The proposed model combines an agent-based multi-criteria supplier evaluation approach with a multi-objective optimization model to capture both behavioral and economical aspects of the supplier selection process. The model uses a system of ordered response models to determine importance weights of the different criteria in supplier evaluation from a buyers’ point of view. The estimated weights are then used to calculate a utility for each potential supplier in the market and rank them. The calculated utilities are then entered into a mathematical programming model in which best suppliers are selected by maximizing the total accrued utility for all buyers and minimizing total shipping costs while balancing the capacity of potential suppliers to ensure market clearing mechanisms. The proposed model, herein, was implemented under an operational agent-based supply chain and freight transportation framework for the Chicago Metropolitan Area.

  2. Patterns of sediment accumulation in Watts Bar Reservoir based on 137Cesium

    International Nuclear Information System (INIS)

    Brandt, C.C.; Rose, K.A.; Cook, R.B.; Dearstone, K.C.; Brenkert, A.L.; Olsen, C.R.

    1991-01-01

    The US Department of Energy has recently undertaken an environmental restoration program designed to achieve remediation of hazardous materials released from the Oak Ridge Reservation (ORR). The distribution of 137 Cs was investigated in sediments from Watts Barr Reservoir and the Clinch River as a possible marker for other contaminants released from the ORR. We have performed additional analyses on the data gathered for this study to investigate possible relationships between 137 Cs accumulation and reservoir characteristics. We found that 137 Cs deposition correlates with sedimentation rate, and soft mud layers of cores have higher 137 Cs levels than sandy mud or eroded soils. No correlation was found with water depth, distance from shore or distance from release source, but it is important to note the data were not collected to test for these effects. We estimate Watts Barr Reservoir contains 267 Ci of 137 Cs, with 7% of this total in the top 16 cm of sediment, and potentially available for biological accumulation. 2 refs

  3. Challenges to nuclear suppliers : positioning for the nuclear renaissance

    International Nuclear Information System (INIS)

    Reimels, R.

    2006-01-01

    With energy demand rising and the increasing recognition of the role of nuclear power as part of the energy mix, opportunities and challenges face the nuclear industry. The ability of nuclear industries to respond to utility requirements in terms of costs, schedule and quality will be determined by entire supplier base. The author speaks to the challenge of the entire infrastructure of suppliers to respond to these opportunities and challenges. Key issues are resource planning, procurement, risk management, supplier collaborations (such as teaming and partnerships); standardization of practices to minimize costs and time; and not least of which, the training, development and recruitment of labour. The author shares his perspective on the role of the supply chain to ensure it has the right resources to provide safe, cost-effective and reliable nuclear deliverables

  4. Priority issues affecting operators' and suppliers' liens: the Alberta perspective

    International Nuclear Information System (INIS)

    Corbett, W.T.

    1996-01-01

    Selected aspects of priority issues in contractual obligations in the petroleum industry were discussed, focusing on the priority issues claimed by suppliers and operators with respect to Alberta properties. Discussions touched upon suppliers' lien rights in Alberta, operators' set-off rights, and on some of the priority issues involving operators' liens

  5. Effects of choline chloride on electrodeposited Ni coating from a Watts-type bath

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yurong; Yang, Caihong; He, Jiawei; Wang, Wenchang [School of Petrochemical Engineering, Changzhou University, Changzhou 213164 (China); Mitsuzak, Naotoshi [Qualtec Co., Ltd, Osaka 590-0906 (Japan); Chen, Zhidong, E-mail: zdchen.lab@gmail.com [School of Material Science and Engineering, Jiangsu Key Laboratory of Materials, Surface and Technology, Changzhou University, Changzhou 213164 (China); Jiangsu Collaborative Innovation Center of Photovoltaic Science and Engineering, Changzhou University, Changzhou 213164 (China); Jiangsu Key Laboratory of Advanced Catalytic Material and Technology, Changzhou University, Changzhou 213164 (China)

    2016-05-30

    Graphical abstract: - Highlights: • ChCl was applied as additive and conducting salt in Watts-type bath. • Progressive addition of ChCl leads to the crystal orientation (1 1 1) predominant. • The grain size and microhardness were refined and enhanced by increasing ChCl. • ChCl could be a good alternative to NiCl{sub 2} and additives for bright Ni electroplating. - Abstract: Electrodeposition of bright nickel (Ni) was carried out in a Watts-type bath. Choline chloride (ChCl) was applied as a multifunctional additive and substitute for nickel chloride (NiCl{sub 2}) in a Watts-type bath. The function of ChCl was investigated through conductivity tests, anodic polarization, and cathodic polarization experiments. The studies revealed that ChCl performed well as a conducting salt, anodic activator, and cathodic inhibitor. The effects of ChCl on deposition rate, preferred orientation, grain size, surface morphology, and microhardness of Ni coatings were also studied. The deposition rate reached a maximum value of greater than 27 μm h{sup −1} when 20 g L{sup −1} ChCl was introduced to the bath. Using X-ray diffraction, it was confirmed that progressive addition of ChCl promoted the preferred crystal orientation modification from (2 0 0) and (2 2 0) to (1 1 1), refined grain size, and enhanced microhardness. The presence of ChCl lowered the roughness of the coating.

  6. How Trust in Financial Supplier Information Impacts Young Adults' Financial Information Involvement

    DEFF Research Database (Denmark)

    Hansen, Torben

    2017-01-01

    Although consumers' risk-taking, supplier trust, social norms and information involvement are central to much of thought in the financial market and consumer economic literature, it is not known how the interplay between consumers' trust in supplier information, risk-taking behaviour and social n...... managers should especially consider investing additional resources in developing information trust for high-risk savings products and should also take social norms into account when considering young adults' high-risk-taking behaviour.......Although consumers' risk-taking, supplier trust, social norms and information involvement are central to much of thought in the financial market and consumer economic literature, it is not known how the interplay between consumers' trust in supplier information, risk-taking behaviour and social...... norm may influence information involvement. This research contributes to the consumer economic literature by investigating how product savings risk and social norm affect the relationship between young adults' trust in supplier information and their information involvement. On the basis of two samples...

  7. Identification of multi-criteria for supplier selection in IT project outsourcing

    Science.gov (United States)

    Fusiripong, Prashaya; Baharom, Fauziah; Yusof, Yuhanis

    2017-10-01

    In the increasing global business competitiveness, most organizations have attempted to determine the suitable external parties to support their core and non-core competency, particularly, in IT project outsourcing. The IT supplier selection is required to apply multi-criteria which comprised tangible criteria and intangible criteria in consider optimal IT supplier. Most researches attempted to identify optimal criteria for selecting IT supplier, however, the criteria cannot be the considered common criteria support the variety of IT outsourcing. Therefore, the study aimed to identify a common set of criteria being used in the various types of IT outsourcing. The common criteria are constructed by multi-criteria and success criteria, which were collected by literature review with comprehensive and comparative approach. Consequently, the researchers are able to identify a common set of criteria adopted in the variety of selection problem IT outsourcing supplier.

  8. Key Supplier Relationship Management: The Case of Croatian Medium-Sized and Large Manufacturing Companies

    Directory of Open Access Journals (Sweden)

    Dario Miočević

    2011-06-01

    Full Text Available The key supplier relationship management represents a vital organizational process. Companies should pay attention not only to managing customer relationships but also to managing relationships with suppliers in order to perform well. They should identify the extent to which a certain supplier adds value through the procurement process. In this line of reasoning, both theory and practice make a distinction between strategic (key and non-strategic (transactional suppliers. By employing the segmentation of the supply market, companies balance their supplier portfolio and are capable of identifying the key suppliers. They can also develop specific programs and initiatives that are aimed at preserving these relationships. In the empirical part of the paper, a survey was conducted on a sample of 123 medium-sized and large Croatian manufacturing companies. The structural model involving the relationship between the key supplier relationship management and value-oriented purchasing was tested. The results indicate that there is a statistically direct, positive and significant relationship between these two constructs. Likewise, the results stress that a theoretical conceptualization and operationalization of the key supplier relationship management construct is both valid and justified. Finally, the theoretical and practical implications and limitations of this study are offered.

  9. An integrative multi-criteria decision making techniques for supplier evaluation problem with its application

    Science.gov (United States)

    Fatrias, D.; Kamil, I.; Meilani, D.

    2018-03-01

    Coordinating business operation with suppliers becomes increasingly important to survive and prosper under the dynamic business environment. A good partnership with suppliers not only increase efficiency, but also strengthen corporate competitiveness. Associated with such concern, this study aims to develop a practical approach of multi-criteria supplier evaluation using combined methods of Taguchi loss function (TLF), best-worst method (BWM) and VIse Kriterijumska Optimizacija kompromisno Resenje (VIKOR). A new framework of integrative approach adopting these methods is our main contribution for supplier evaluation in literature. In this integrated approach, a compromised supplier ranking list based on the loss score of suppliers is obtained using efficient steps of a pairwise comparison based decision making process. Implemetation to the case problem with real data from crumb rubber industry shows the usefulness of the proposed approach. Finally, a suitable managerial implication is presented.

  10. Handling technology of Mega-Watt millimeter-waves for optimized heating of fusion plasmas

    NARCIS (Netherlands)

    Shimozuma, T.; Kubo, S.; Yoshimura, Y.; Igami, H.; Takahashi, H.; Takita, Y.; Kobayashi, S.; Ito, S.; Mizuno, Y.; Idei, H.; Notake, T.; Shapiro, M.A.; Temkin, R.J.; Felici, F.; Goodman, T.P.; Sauter, O.; Minami, R.; Kariya, T.; Imai, T.; Mutoh, T.

    2009-01-01

    Millimeter-wave components were re-examined for high power (Mega-Watt) and steady-state (greater than one hour) operation. Some millimeter-wave components, including waveguide joints, vacuum pumping sections, power monitors, sliding waveguides, and injection windows, have been improved for high

  11. Three echelon supply chain design with supplier evaluation

    DEFF Research Database (Denmark)

    Gandhi, Kanika; Jha, P. C.; Govindan, M.E., PhD.,, Kannan

    2014-01-01

    An effective supply chain management (SCM) facilitates companies to react to changing demand by swiftly communicating their needs to the supplier. Optimizing a supply chain (SC) performance is a key factor for success in long term SC relationships. Substantial information such as price, delivery...... in procurement and distribution in a supplier selection problem and a fuzzy model with two objectives is defined. The proposed model is a “fuzzy bi-objective mixed integer nonlinear” problem. To process the solution the fuzzy model is converted into crisp and further fuzzy goal programming approach is employed...

  12. Simulation embedded artificial intelligence search method for supplier trading portfolio decision

    DEFF Research Database (Denmark)

    Feng, Donghan; Yan, Z.; Østergaard, Jacob

    2010-01-01

    An electric power supplier in the deregulated environment needs to allocate its generation capacities to participate in contract and spot markets. Different trading portfolios will provide suppliers with different future revenue streams of various distributions. The classical mean-variance (MV) m...

  13. A study of effluent control technologies employed by radiopharmaceutical users and suppliers

    International Nuclear Information System (INIS)

    Leventhal, L.; Slider, J.; Chakoff, E.; Chen, J.I.; Savage, E.

    1980-01-01

    The quantities of radiopharmaceuticals produced for in-vivo diagnostic and therapy procedures has been estimated to be growing at the rate of 16% per year, based on 1978 sales figures. Nuclear medicine facilities are experiencing an average annual growth rate of 5% per year. The principle radionuclides produced and used for nuclear medicine are 131 I, 131 Xe, and sup(9m)Tc. Of particular concern is that amount of these radionuclides which might become airborne and escape into the environment during the process of manufacture or during aliquotting or administration by hospital personnel. Therefore, a study was made of the effluent control technology employed by radiopharmaceutical suppliers and users. Generally, the means used to control airborne radioactive effluents fall into two classes according to function. The controls either dilute and direct the effluent to a specific point of release or hold up the effluent to reduce by decay the amount of radioactivity released. Radiopharmaceutical suppliers and hospitals were contacted, and a survey made of the control technology used. The classes and types of effluent control equipment and their general characteristics, cost and effectiveness were determined. It was concluded that control equipment was readily available, reliable, and effective in reducing radioactive releases from radiopharmaceutical facilities. (author)

  14. Identification of a supplier network through Quality Function Deployment

    DEFF Research Database (Denmark)

    Kristensen, Preben Sander; Holmen, Elsebeth

    1994-01-01

    and characteristics constituting this fan were based on the company's knowledge before entering into development interaction with suppliers. If these characteristics are used to express the company's demand in the subsequent interaction process, much information may be lost. We suggest that in development interacton...... supplier a company has to cancel the initial transformation processes that caused it to start interaction with the supplier in question, and start interaction on the basis of end-user attributes in their original forms, making new transofrmation processes into characteristics based on the joint knowledge......During 1993-94 the authors followed a product development process in a Danish Butter Cookie company. The process was structured according to the Quality Function Deployment technique House of Quality. Customer attributes were derived from a discus a diabetics end-user focus group. During a series...

  15. Dependency on suppliers as a peril in the acquisition of innovations? The role of buyer attractiveness in mitigating potential negative dependency effects in buyer–supplier relations

    NARCIS (Netherlands)

    Schiele, Holger; Vos, Frederik Guido Sebastiaan

    2015-01-01

    New product development occurs nowadays mostly in joint buyer–supplier projects, which require closer ties between the partners in order to mobilize their resources. One issue arising from this collaborative model is that the buyer tends to become more dependent on the supplier. Multiple cases of

  16. The global supplier - myth or reality?

    Energy Technology Data Exchange (ETDEWEB)

    Crawshaw, S A.M. [Long-Airdox Ltd., Ilkeston (United Kingdom)

    2002-02-01

    Coal remains a key feature of the world's energy and steel markets and coal mining is a global industry. Suppliers of equipment to the coal-mining industry have seen traditional markets almost disappear and new markets emerge. Suppliers need to work closely with customers, sometimes in remote areas developing long-term partnerships and continually improving the product to their mutual benefit. An attempt to explain how global changes to the underground coal industry have influenced the supply of coal-mining equipment is illustrated by recent developments in the Long-Airdox group. An example is given of how the group worked with the Cayirhan Mine in Turkey supplying cast armoured face conveyors for longwall mining. The paper was presented at a meeting of the Nottinghamshire Branch of the Institution of Mining and Metallurgy on 3 June 1998 in Nottinghamshire, UK. 1 fig.

  17. Priority issues affecting operators' and suppliers' liens: the Saskatchewan perspective

    International Nuclear Information System (INIS)

    Milani, M.W.

    1996-01-01

    Priority issues in contractual obligations in the petroleum industry were discussed from the perspective of Saskatchewan. In Saskatchewan, the priority issues relative to builders' and suppliers' liens are similar to those of Alberta, but there are some subtle differences, which were addressed. Priority issues claimed by suppliers and operators with respect to Saskatchewan properties were given special attention

  18. Organising for Learning - Adaptive and Innovative Learning in Customer-Supplier Relationships

    DEFF Research Database (Denmark)

    Christensen, Poul Rind; Damgaard, Torben; Munksgaard, Kristin B.

    2004-01-01

    Based on studies of supplier associations, the concepts of adaptived and innovative learning in an interoganisational setting are defined and discussed.......Based on studies of supplier associations, the concepts of adaptived and innovative learning in an interoganisational setting are defined and discussed....

  19. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  20. Customer-supplier alliances: A co-engineering process

    International Nuclear Information System (INIS)

    Ouellet, P.

    1996-01-01

    The 90's are forcing companies to review all aspects of doing business. Partnerships, alliances and other inter-company relationships are now a matter of course. This paper explores an alternate method currently utilized by one of the major US oil pipelines to acquire products and/or services. The method stresses the formation of long-term alliances to the mutual benefit of both the supplier and the end user companies. The paper uses as an example a SCADA system currently being implemented for this oil company. It outlines the method and explains the pitfalls that have been encountered. As well, the potential benefits to both the supplier and the customer are summarized

  1. Erbium:ytterbium fiber-laser system delivering watt-level femtosecond pulses using divided pulse amplification

    Science.gov (United States)

    Herda, Robert; Zach, Armin

    2015-03-01

    We present an Erbium:Ytterbium codoped fiber-amplifer system based on Divided-Pulses-Amplification (DPA) for ultrashort pulses. The output from a saturable-absorber mode-locked polarization-maintaining (PM) fiber oscillator is amplified in a PM normal-dispersion Erbium-doped fiber. After this stage the pulses are positively chirped and have a duration of 2.0 ps at an average power of 93 mW. A stack of 5 birefringent Yttrium-Vanadate crystals divides these pulses 32 times. We amplify these pulses using a double-clad Erbium:Ytterbium codoped fiber pumped through a multimode fiber combiner. The pulses double pass the amplifier and recombine in the crystals using non-reciprocal polarization 90° rotation by a Faraday rotating mirror. Pulses with a duration of 144 fs are obtained after separation from the input beam using a polarizing beam splitter cube. These pulses have an average power of 1.85 W at a repetition rate of 80 MHz. The generation of femtosecond pulses directly from the amplifier was enabled by a positively chirped seed pulse, normally dispersive Yttrium-Vanadate crystals, and anomalously dispersive amplifier fibers. Efficient frequency doubling to 780 nm with an average power of 725 mW and a pulse duration of 156 fs is demonstrated. In summary we show a DPA setup that enables the generation of femtosecond pulses at watt-level at 1560 nm without the need for further external dechirping and demonstrate a good pulse quality by efficient frequency doubling. Due to the use of PM fiber components and a Faraday rotator the setup is environmentally stable.

  2. Subcontractors and Component Suppliers in the Swedish Wind Power Industry

    International Nuclear Information System (INIS)

    Takeuchi, Linn

    2003-05-01

    This paper studies the Swedish component suppliers in the wind power industry. This group has not received much attention so far, and today very little is known. This study addresses the fact that the Swedish component suppliers have not been able to penetrate the wind power market despite the Swedish industry's strength in mechanical and electrical engineering. The aims of this paper were to gather information regarding the existing production and to identify factors that affect the Swedish component suppliers' scope to penetrate the wind turbine market. To date, although Sweden has spent considerable amounts of money on projects involving wind turbines, there is no series production of large wind turbines in Sweden. The historical development of the wind turbine industry suggests this alone would have inhibited the development of component production in Sweden. Yet, the country's proximity and good access to large wind turbine producing countries should be an advantage. Various factors and issues are identified and discussed in this paper that are relevant for the Swedish component suppliers' scope to penetrate the wind turbine market. These include market and product development, buyer-supplier relationships, export and sourcing behaviors, and time of market entry. This is a first step towards increasing the knowledge of Swedish component production and it is recognized that more studies are required. Various areas where relevant knowledge is largely missing or scarce are identified and discussed as well, and should serve as relevant starting points for continued research

  3. ATLAS Supplier Award for the ECT Vacuum Vessels

    CERN Multimedia

    Jenni, P

    On 12 February the Netherlands firm Schelde Exotech was awarded the ATLAS Supplier Award for the construction of the two vacuum vessels for the ATLAS End- Cap Toroid (ECT) magnets. ATLAS Supplier Award ceremonies have now become something of a tradition. For the third consecutive year, ATLAS has given best supplier awards for the most exceptional contributors to the construction of the detector. The Netherlands firm Schelde Exotech has just received the award for the construction of the two vacuum vessels for the ECTs. With a diameter of 11 metres and a volume of 550 cubic metres, the ECT vacuum vessels are obviously impressive in scale. They consist of large aluminium plates and a stainless steel central bore tube. In order to obtain the required undulations, the firm had to develop a special assembly and welding technique. Despite the chambers' imposing size, a very high degree of precision has been achieved in their geometry. Moreover, the chambers, which were delivered in July 2002 to CERN, were built i...

  4. Supplier Selection Proces: An Investigation and Implementation Action at Construction/Building Company

    OpenAIRE

    Hensmit, Andre

    2008-01-01

    The investigation was carried out to identify and understand the key characteristic of supplier selection that is to be considered in the real experience by Construction Company in South East Asia, especially Indonesia. The goal of this project focuses on the selection supplier process and its approaches, how the company performing the co-partnership relationship with suppliers, and as well find out the reason fro accomplishing these factors. The project involves interviewing a company in Ind...

  5. Strategic Wholesale Pricing for an Incumbent Supplier Facing with a Competitive Counterpart

    OpenAIRE

    Sun, Jianwu

    2014-01-01

    We introduce a wholesale pricing strategy for an incumbent supplier facing with a competitive counterpart. We propose a profit function which considers both the present loss and future loss from a wholesale price and then study the optimal wholesale prices for different objectives about this profit function for the incumbent supplier. First, we achieve an optimal wholesale price for the incumbent supplier to maximize his expected profit. Then, to reduce the risk originating from the fluctuati...

  6. ATLAS Award for Shield Supplier

    CERN Multimedia

    2004-01-01

    ATLAS technical coordinator Dr. Marzio Nessi presents the ATLAS supplier award to Vojtech Novotny, Director General of Skoda Hute.On 3 November, the ATLAS experiment honoured one of its suppliers, Skoda Hute s.r.o., of Plzen, Czech Republic, for their work on the detector's forward shielding elements. These huge and very massive cylinders surround the beampipe at either end of the detector to block stray particles from interfering with the ATLAS's muon chambers. For the shields, Skoda Hute produced 10 cast iron pieces with a total weight of 780 tonnes at a cost of 1.4 million CHF. Although there are many iron foundries in the CERN member states, there are only a limited number that can produce castings of the necessary size: the large pieces range in weight from 59 to 89 tonnes and are up to 1.5 metres thick.The forward shielding was designed by the ATLAS Technical Coordination in close collaboration with the ATLAS groups from the Czech Technical University and Charles University in Prague. The Czech groups a...

  7. Information asymmetries as antecedents of opportunism in buyer-supplier relationships: testing principal-agent theory

    NARCIS (Netherlands)

    Steinle, Claus; Schiele, Holger; Ernst, Tanja

    2014-01-01

    Purpose: A severe problem in supplier selection refers to moral hazard: suppliers not behaving in the expected way once contracted. Principal-agent theory could provide insights on how to reduce this problem. Because buyer–supplier relationships can be interpreted as principal-agent situations, the

  8. Supplier development and cost management in South-East Asia - Results from a field study

    NARCIS (Netherlands)

    Wouters, Marc; van Jarwaarde, Ewout; Groen, B.A.C.

    2007-01-01

    This paper is about supplier development when international companies have production sites in Southeast Asia and look for opportunities to switch from international suppliers to local suppliers. We conducted a field study involving site visits to companies in Thailand and Vietnam, and interviews at

  9. A Combined group EA-PROMETHEE method for a supplier selection problem

    Directory of Open Access Journals (Sweden)

    Hamid Reza Rezaee Kelidbari

    2016-07-01

    Full Text Available One of the important decisions which impacts all firms’ activities is the supplier selection problem. Since the 1950s, several works have addressed this problem by treating different aspects and instances. In this paper, a combined multiple criteria decision making (MCDM technique (EA-PROMETHEE has been applied to implement a proper decision making. To this aim, after reviewing the theoretical background regarding to supplier selection, the extension analysis (EA is used to determine the importance of criteria and PROMETHEE for appraisal of suppliers based on the criteria. An empirical example illustrated the proposed approach.

  10. Profiles of Major Suppliers to the Automotive Industry : Vol. 7. Machine Tool Suppliers to the Automotive Industry.

    Science.gov (United States)

    1982-08-01

    This study summarizes extensive information collected over a two-year period (October 1978 to October 1980) on suppliers of parts and components, materials, and machine tools to the automotive industry in the United States. The objective of the study...

  11. Profiles of Major Suppliers to the Automotive Industry : Vol. 4. North American Automotive Parts and Components Suppliers

    Science.gov (United States)

    1982-08-01

    This study summarizes extensive information collected over a two-year period (October 1978 to October 1980) on suppliers of parts and components, materials, and machine tools to the automotive industry in the United States. The objective of the study...

  12. A critical analysis of the NegaWatt scenario

    International Nuclear Information System (INIS)

    Anon.

    2011-01-01

    The author proposes a rather radical critical analysis of the NegaWatt scenario which is mainly based on the development of the use of solid and liquid biomass produced by forests and farms, and of some marginal resources like wood and urban wastes. He shows that wood resources in France are not sufficient as part of the wood is used for construction. A further exploitation of wood would lead to a dramatic increase of costs. He shows that the scenario overestimates the available wood in France, and moreover, that the promoters of the scenario overstep the physical, biological, social and economic limits of the real world of agriculture

  13. Development of supplier evaluation model applying in nuclear power plants

    International Nuclear Information System (INIS)

    Wang Yonggang; Fang Chunfa

    2006-01-01

    It is essential for the safe and stable operations of Nuclear Power Plants that various resources in the supply chain are effectively managed. Supplier is a significant resource of nuclear entities serving as an extension of the operation process. Scientific and radiation evaluation of the performance of suppliers is of vital importance to an effective and high quality supply chain. This paper establishes an advance and practical supplier evaluation system that is applicable for the operational nuclear power plants, based on the analysis of the current operation status of Daya Bay Nuclear Power Station against its targeted objectives, the acquisition of relevant practices home and abroad and the benchmarking with advanced peers, in order to enhance the core competence of nuclear power plant. (authors)

  14. Modeling Multilevel Supplier Selection Problem Based on Weighted-Directed Network and Its Solution

    Directory of Open Access Journals (Sweden)

    Chia-Te Wei

    2017-01-01

    Full Text Available With the rapid development of economy, the supplier network is becoming more and more complicated. It is important to choose the right suppliers for improving the efficiency of the supply chain, so how to choose the right ones is one of the important research directions of supply chain management. This paper studies the partner selection problem from the perspective of supplier network global optimization. Firstly, this paper discusses and forms the evaluation system to estimate the supplier from the two indicators of risk and greenness and then applies the value as the weight of the network between two nodes to build a weighted-directed supplier network; secondly, the study establishes the optimal combination model of supplier selection based on the global network perspective and solves the model by the dynamic programming-tabu search algorithm and the improved ant colony algorithm, respectively; finally, different scale simulation examples are given to testify the efficiency of the two algorithms. The results show that the ant colony algorithm is superior to the tabu search one as a whole, but the latter is slightly better than the former when network scale is small.

  15. QUANTITY DISCOUNTS IN SUPPLIER SELECTION PROBLEM BY USE OF FUZZY MULTI-CRITERIA PROGRAMMING

    Directory of Open Access Journals (Sweden)

    Tunjo Perić

    2011-02-01

    Full Text Available Supplier selection in supply chain is a multi-criteria problem that involves a number of quantitative and qualitative factors. This paper deals with a concrete problem of flour purchase by a company that manufactures bakery products and the purchasing price of flour depends on the quantity ordered. The criteria for supplier selection and quantities supplied by individual suppliers are: purchase costs, product quality and reliability of suppliers. The problem is solved using a model that combines revised weighting method and fuzzy multi-criteria linear programming (FMCLP. The paper highlights the efficiency of the proposed methodology in conditions when purchasing prices depend on order quantities.

  16. Evaluating the bases of supplier segmentation

    DEFF Research Database (Denmark)

    Day, Marc; Magnan, Gregory M.; Munkgaard Møller, Morten

    2010-01-01

    fragmentary in nature, current portfolio models are grouped into two principal taxonomic constructs of power and dependence and relational factors. In particular, the prevalent use of transaction cost economics (TCE) in portfolio modelling provides a foundation for purchasers to appraise risks from supplier...

  17. Developing a Green Supplier Selection Model by Using the DANP with VIKOR

    Directory of Open Access Journals (Sweden)

    Tsai Chi Kuo

    2015-02-01

    Full Text Available This study proposes a novel hybrid multiple-criteria decision-making (MCDM method to evaluate green suppliers in an electronics company. Seventeen criteria in two dimensions concerning environmental and management systems were identified under the Code of Conduct of the Electronic Industry Citizenship Coalition (EICC. Following this, the Decision-Making Trial and Evaluation Laboratory (DEMATEL used the Analytic Network Process (ANP method (known as DANP to determine both the importance of evaluation criteria in selecting suppliers and the causal relationships between them. Finally, the VlseKriterijumska Optimizacija I Kompromisno Resenje (VIKOR method was used to evaluate the environmental performances of suppliers and to obtain a solution under each evaluation criterion. An illustrative example of an electronics company was presented to demonstrate how to select green suppliers.

  18. Influence of Product and Supplier Attributes on Hardwood Lumber Purchase Decisions

    Science.gov (United States)

    Craig L. Forbes; Steven A. Sinclair; Robert J. Bush; Philip A. Araman

    1994-01-01

    This study determined the influence of product and supplier attributes on hardwood lumber purchases by wood furniture manufacturers and investigated differences across manufacturer type, geographic region, firm size, and kiln ownership. Professional lumber buyers rated the importance and difference across suppliers of various attributes. Purchase influence scores were...

  19. Contextualizing Territories in Gvc Supplier Nodes to Understand Chain Entry Barriers

    DEFF Research Database (Denmark)

    Thomsen, Lotte; Kamau, Paul; McCormick, Dorothy

    This paper deals with entry barriers for developing country suppliers to global value chains (GVCs). It is based on a study of food processing firms in Kenya undertaken between 2012 and 2014. The paper focuses on how entry barriers to GVCs are sometimes constructed within supplier countries, and ...

  20. Partners in quality: managing your suppliers.

    Science.gov (United States)

    Conway, B A

    1991-05-01

    Just expecting more from your supplier is not what partnership is about. We have had the experience where the quality improvement and partnership banner has been waved but the tone and spirit of the meeting did not encourage or support a joint quality improvement effort. Benefits will not be achieved until the wall truly begins to come apart and the relationship is built on mutual respect and trust. Data collection and open answers to questions often reveal embarrassing errors and obvious needs for improvements. As stated before, blame and finger-pointing must be replaced with a mutual commitment to asking and answering the question, "How can we improve?" As Dr. W. Edwards Deming has stated, "End the practice of awarding business on the basis of price tag. Instead, minimize total cost. Move toward a single supplier for any one item on a long-term relationship of loyalty and trust." The structured approach of a quality improvement process and the application of quality methods and techniques has proven useful in removing emotion and helping the team focus on the process rather than the people and the issues involved. Quality improvement methods are focused on achieving both customer and supplier goals--customer satisfaction, employee satisfaction, and operational efficiency and effectiveness. Our experience with Partners in Quality as well as our experience with the quality leadership process supports a recent quote in the Harvard Business Review: "Quality is not just a slogan...(it is) the most profitable way to run a business."

  1. Subcontractors and Component Suppliers in the Swedish Wind Power Industry

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, Linn

    2003-05-01

    This paper studies the Swedish component suppliers in the wind power industry. This group has not received much attention so far, and today very little is known. This study addresses the fact that the Swedish component suppliers have not been able to penetrate the wind power market despite the Swedish industry's strength in mechanical and electrical engineering. The aims of this paper were to gather information regarding the existing production and to identify factors that affect the Swedish component suppliers' scope to penetrate the wind turbine market. To date, although Sweden has spent considerable amounts of money on projects involving wind turbines, there is no series production of large wind turbines in Sweden. The historical development of the wind turbine industry suggests this alone would have inhibited the development of component production in Sweden. Yet, the country's proximity and good access to large wind turbine producing countries should be an advantage. Various factors and issues are identified and discussed in this paper that are relevant for the Swedish component suppliers' scope to penetrate the wind turbine market. These include market and product development, buyer-supplier relationships, export and sourcing behaviors, and time of market entry. This is a first step towards increasing the knowledge of Swedish component production and it is recognized that more studies are required. Various areas where relevant knowledge is largely missing or scarce are identified and discussed as well, and should serve as relevant starting points for continued research.

  2. Analisis Pemilihan Supplier Pada Komponen Lamp Cord Assy Untuk Speedometer Honda Blade Di PT. Indonesia Nippon Seiki

    OpenAIRE

    Sundana, Sambas; Sari, Yossy Yulia

    2014-01-01

    Dalam memenuhi kebutuhan speedometer PT. Indonesia Nippon Seiki bekerja samadengan supplier untuk mensuplai bahan baku nya. Bagian pembelian PT. IndonesiaNippon Seiki bertugas untuk melakukan proses pembelian dan pemilihan supplier yangtepat. Pemilihan supplier merupakan salah satu hal yang penting dalam aktivitaspembelian bagi Perusahaan. Penelitian ini ditulis dalam rangka meneliti bagaimana caramemilih supplier. Metode yang digunakan untuk pemilihan supplier adalah AHP(Analytical Hierarchy...

  3. Supplier selection problem: A fuzzy multicriteria approach

    African Journals Online (AJOL)

    kirstam

    simultaneously: maximising the total value of purchases, minimising ... Keywords: Supplier selection, multi-criteria decision-making, fuzzy logic, satisfaction ... includes both qualitative and quantitative factors, and it is necessary to make a.

  4. The Strategic Importance of Supplier Relationships in the Automotive Industry

    Directory of Open Access Journals (Sweden)

    Ove Brandes

    2013-06-01

    stakeholders, and who can outsource a large part of the technical development to the suppliers in areas also close to the core competences. The automakers must accept that their suppliers have competing automakers as their customers and search for synergies in their product portfolio. Theoretically, there is a need for conceptual development through deeper studies of the firm’s relational capability and its implications.

  5. Sustainable Supplier Performance Evaluation and Selection with Neofuzzy TOPSIS Method

    OpenAIRE

    Chaharsooghi, S. K.; Ashrafi, Mehdi

    2014-01-01

    Supplier selection plays an important role in the supply chain management and traditional criteria such as price, quality, and flexibility are considered for supplier performance evaluation in researches. In recent years sustainability has received more attention in the supply chain management literature with triple bottom line (TBL) describing the sustainability in supply chain management with social, environmental, and economic initiatives. This paper explores sustainability in supply chain...

  6. Supplier Selection for Food Industry: A Combination of Taguchi Loss Function and Fuzzy Analytical Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Renna Magdalena

    2012-09-01

    Full Text Available Supplier selection is an important part of supply chain management process by which firms identify, evaluate, and establish contracts with suppliers. Deciding the right supplier can be a complex task. As such, various criteria must be taken into account to choose the best supplier. This study focused on the supply in the packaging division of a food industry in Denpasar-Bali. A combination of Taguchi Loss Function and fuzzy-AHP (Analytical Hierarchy Process Fuzzy Linear Programming was used to determine the best supplier. In this analysis, several suppliers’ criteria were considered, namely quality, delivery, completeness, quality loss and environmental management. By maximizing the suppliers’ performances based on each criterion and aggregating the suppliers’ performances based on the overall criteria, the best supplier was determined. Keywords: supplier selection, taguchi loss function, AHP, fuzzy linear programming,environment

  7. Effects of choline chloride on electrodeposited Ni coating from a Watts-type bath

    Science.gov (United States)

    Wang, Yurong; Yang, Caihong; He, Jiawei; Wang, Wenchang; Mitsuzak, Naotoshi; Chen, Zhidong

    2016-05-01

    Electrodeposition of bright nickel (Ni) was carried out in a Watts-type bath. Choline chloride (ChCl) was applied as a multifunctional additive and substitute for nickel chloride (NiCl2) in a Watts-type bath. The function of ChCl was investigated through conductivity tests, anodic polarization, and cathodic polarization experiments. The studies revealed that ChCl performed well as a conducting salt, anodic activator, and cathodic inhibitor. The effects of ChCl on deposition rate, preferred orientation, grain size, surface morphology, and microhardness of Ni coatings were also studied. The deposition rate reached a maximum value of greater than 27 μm h-1 when 20 g L-1 ChCl was introduced to the bath. Using X-ray diffraction, it was confirmed that progressive addition of ChCl promoted the preferred crystal orientation modification from (2 0 0) and (2 2 0) to (1 1 1), refined grain size, and enhanced microhardness. The presence of ChCl lowered the roughness of the coating.

  8. Supplier challenges in health tech innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Suppliers, in particular small innovative firms, is an important contributor not only for innovation in health-tech, but also a component to consider in the light of the emerging policy interest for using public procurement as a means to stimulate innovation. Research on barriers preventing...

  9. Novel Distance Measure in Fuzzy TOPSIS for Supply Chain Strategy Based Supplier Selection

    Directory of Open Access Journals (Sweden)

    B. Pardha Saradhi

    2016-01-01

    Full Text Available In today’s highly competitive environment, organizations need to evaluate and select suppliers based on their manufacturing strategy. Identification of supply chain strategy of the organization, determination of decision criteria, and methods of supplier selection are appearing to be the most important components in research area in the field of supply chain management. In this paper, evaluation of suppliers is done based on the balanced scorecard framework using new distance measure in fuzzy TOPSIS by considering the supply chain strategy of the manufacturing organization. To take care of vagueness in decision making, trapezoidal fuzzy number is assumed for pairwise comparisons to determine relative weights of perspectives and criteria of supplier selection. Also, linguistic variables specified in terms of trapezoidal fuzzy number are considered for the payoff values of criteria of the suppliers. These fuzzy numbers satisfied the Jensen based inequality. A detailed application of the proposed methodology is illustrated.

  10. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-01-01

    Case study describes Pacific Northwest National Laboratory's (PNNL) three-month Rock the Watt campaign to reduce energy use at its main campus in Richland, Washington. The campaign objectives were to educate PNNL employees about energy conservation opportunities in their workplace and to motivate them to help PNNL save energy and costs and to reduce greenhouse gas emissions.

  11. Addressing the Challenges of Sharing Lessons Learned Amongst Suppliers in a Fragmented and Competitive Marketplace

    International Nuclear Information System (INIS)

    Dennier, D.

    2016-01-01

    Historically, COG member utilities largely drew from in-house supporting functions or the original plant designers, allowing active sharing of operational and human performance experience amongst a small number of relevant parties. As the industry has evolved, utilities have increasingly drawn upon a greater number of independent external suppliers to provide goods and services. This diversification in supplier base within a competitive environment changes operating dynamics, as a safety culture-focused supplier must remain mindful of developing and retaining competitive advantages over other suppliers. A market-driven perspective may undermine the likelihood of sharing certain lessons learned and best practices for fear of weakening competitive position. Utility procurement procedures must ensure fair markets to be effective, but in doing so may limit opportunity for collaboration between supplier and utility compared to historic levels. Vibrant competitive markets attract a large number of suppliers, which adds to the complexity of effective sharing and absorption of industry lessons learned. This paper will explain the activities underway through the COG Supplier Participant program to remove impediments and share industry-wide operational lessons learned and best practices. (author)

  12. A multi-criteria decision making approach for supplier selection in the flexible packaging industry

    Directory of Open Access Journals (Sweden)

    Cristea Ciprian

    2017-01-01

    Full Text Available The supplier selection problem represents one of the most important components of the supply chain management. This article presents a multiple criteria decision making analysis contributing to the selection of the most convenient supplier in the flexible packaging industry. Due to the fact that in today's supply chain management, the performance of potential suppliers is evaluated against multiple criteria rather than taking into account only the cost factor, the appropriate criteria in the supplier selection have been identified, and the considered variants are assessed, considering the decision maker’s preferences and existing constraints. The variants are ranked in terms of their suitability for selecting a supplier with the use of Electre III method. The results obtained from the simulation experiment suggest that this methodology is a feasible decision support model.

  13. A supplier selection using a hybrid grey based hierarchical clustering and artificial bee colony

    Directory of Open Access Journals (Sweden)

    Farshad Faezy Razi

    2014-06-01

    Full Text Available Selection of one or a combination of the most suitable potential providers and outsourcing problem is the most important strategies in logistics and supply chain management. In this paper, selection of an optimal combination of suppliers in inventory and supply chain management are studied and analyzed via multiple attribute decision making approach, data mining and evolutionary optimization algorithms. For supplier selection in supply chain, hierarchical clustering according to the studied indexes first clusters suppliers. Then, according to its cluster, each supplier is evaluated through Grey Relational Analysis. Then the combination of suppliers’ Pareto optimal rank and costs are obtained using Artificial Bee Colony meta-heuristic algorithm. A case study is conducted for a better description of a new algorithm to select a multiple source of suppliers.

  14. The Role of Green and Traditional Supplier Attributes on Business Performance

    Directory of Open Access Journals (Sweden)

    José Roberto Mendoza-Fong

    2017-08-01

    Full Text Available Supplier evaluation and selection are fundamental tasks since they are part of the production process and even initiate the supply chain (SC. Despite their importance in the production system, supplier evaluation and selection may be challenging activities to be performed if companies look at the wide range of available evaluation techniques and methodologies, which now seek to integrate both traditional and green attributes. In addition, companies may refuse to take into account green attributes during the supplier selection process, because they do not know their impact on commercial benefits. To overcome this limitation, this study examines the Mexican manufacturing sector and measures the impact of supplier traditional attributes and green attributes on business performance, namely production process benefits and commercial benefits. As data collection instrument, we administered a survey to 253 supplier evaluators and selectors; then, using the gathered data, we constructed a structural equation model. The model includes four variables to determine the impact of traditional and green attributes on business performance: green attributes, traditional attributes, production process benefits, and commercial benefits. The results indicate that all the latent variables have positive direct effects on one another. For instance, process benefits show the largest effects on commercial benefits, but the most significant effect is caused by traditional attributes on commercial benefits through green attributes and production process benefits.

  15. A Hybrid Multiple Criteria Decision Making Model for Supplier Selection

    Directory of Open Access Journals (Sweden)

    Chung-Min Wu

    2013-01-01

    Full Text Available The sustainable supplier selection would be the vital part in the management of a sustainable supply chain. In this study, a hybrid multiple criteria decision making (MCDM model is applied to select optimal supplier. The fuzzy Delphi method, which can lead to better criteria selection, is used to modify criteria. Considering the interdependence among the selection criteria, analytic network process (ANP is then used to obtain their weights. To avoid calculation and additional pairwise comparisons of ANP, a technique for order preference by similarity to ideal solution (TOPSIS is used to rank the alternatives. The use of a combination of the fuzzy Delphi method, ANP, and TOPSIS, proposing an MCDM model for supplier selection, and applying these to a real case are the unique features of this study.

  16. The effects of balanced and asymmetric dependence on supplier satisfaction : Identifying positive effects of dependency

    NARCIS (Netherlands)

    Caniëls, Marjolein C.J.; Vos, Frederik G.S.; Schiele, Holger; Pulles, Niels J.

    2017-01-01

    Studies argue that balance in dependence is critical to supplier satisfaction in buyer-supplier relationships. We examine whether asymmetric relationships can also lead to supplier satisfaction, arguing that traditional analysis methods are unsuitable for thoroughly analyzing this issue. With

  17. Identifying the 'right' supplier for module developments-a cross-industrial case analysis

    NARCIS (Netherlands)

    Eggers, Justus Erich; Hofman, Erwin; Schiele, Holger; Holschbach, Elmar

    2017-01-01

    Relational view argues that buying companies should integrate supplier resources in new product development (NPD) projects to realise competitive advantages. Due to decoupling of modules and the associated opportunity to allocate development activities to upstream suppliers, modular product

  18. Supplier selection based on improved MOGA and its application in nuclear power equipment procurement

    International Nuclear Information System (INIS)

    Yan Zhaojun; Wang Dezhong; Zhou Lei

    2007-01-01

    Considering the fact that there are few objective and available methods supporting the supplier selection in nuclear power equipment purchasing process, a supplier selection method based on improved multi-objective genetic algorithm (MOGA) is proposed. The simulation results demonstrate the effectiveness and efficiency of this method for the supplier selection in nuclear power equipment procurement process. (authors)

  19. Supplier selection in supply chain management using analytical network process for Indonesian cement industry

    Science.gov (United States)

    Ismail, A. H.; Mahardika, R. Z. Z.

    2017-12-01

    Supply chain management has increased more significance with the impact of globalization. In the present worldwide market, well-managed supply chain is a standout amongst the most vital requirement to be more competitive in the market. For any organization incorporate cement industry, the most critical decision in initial process of supply chain management is to buy products, materials or services from suppliers. So the role of suppliers is irrefutable important in the global aggressive markets. Appropriate decision of supplier selection can lead to reducing cost in supply chain management. However, it is becoming more complex because of existing various criteria and involving the suitable experts in the company to make valid decision in accordance with its criteria. In this study, the supplier selection of an Indonesia’s leading cement company is analyzed by using one of the popular multi-criteria decision making method, Saaty’s analytical network process (ANP). It is employed for the selection of the best alternative among three suppliers of pasted bag. Supplier with the highest rank comes from several major steps from building the relationship between various criteria to rating the alternatives with the help of experts from the company. The results show that, Communication capability, Flexible payment terms, Ability to meet delivery quantities are the most important criteria in the pasted bag supplier selection in Indonesian cement industry with 0.155, 0.110 and 0.1 ANP coefficient respectively. And based on the ANP coefficient values in limit supermatrix, the A2 or supplier 2 had the highest score with 64.7% or 0.13 ANP coefficient.

  20. Gold awards for CERN's top suppliers!

    CERN Multimedia

    2003-01-01

    CERN's awards to the LHC project's best suppliers are now into their second year. Three companies received 'Golden Hadrons' for 2003. The Golden Hadron awards were presented to the delighted representatives of the winning firms by LHC Project Leader Lyn Evans on Friday 16 May. Only three out of the LHC's four hundred suppliers were lucky enough to receive a gold award. The consortium IHI (Japan)-Linde Kryotechnik (Switzerland), the Belgian company JDL Technologies and the Japanese firm Furukawa Electric Company were rewarded not only for their technical and financial achievements but also for their compliance with contractual deadlines. The 2003 Golden Hadron winners with Lyn Evans. From left to right: Armin Senn, Thomas Voigt, Kirkor Kurtcuoglu of LINDE KRYOTECHNIK ; Tadaaki Honda, Project Leader and Motoki Yoshinaga, Associate Director of IHI Corporation ; Lyn Evans, LHC Project Leader; Shinichiro Meguro, Managing Director of FURUKAWA ELECTRIC COMPANY ; Nobuyoshi Saji, Consulting Engineer of IHI Corporatio...

  1. SDC Supplier Obligation project : household energy from 2011 : final report

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This report is based on 'SDC Supplier Obligation engagement project : process plan'. Evaluation of the engagement process used in this report can be found in 'SDC Supplier Obligation project : an evaluation of the Sustainable Development Commission's stakeholder and public engagement process'. This report presents the findings of the Sustainable Development Commission’s stakeholder and public engagement process and informs the development of Department for Environment, Food and Rural Af...

  2. Applying Fuzzy Decision Making Approach to IT Outsourcing Supplier Selection

    OpenAIRE

    Gülcin Büyüközkan; Mehmet Sakir Ersoy

    2009-01-01

    The decision of information technology (IT) outsourcing requires close attention to the evaluation of supplier selection process because the selection decision involves conflicting multiple criteria and is replete with complex decision making problems. Selecting the most appropriate suppliers is considered an important strategic decision that may impact the performance of outsourcing engagements. The objective of this paper is to aid decision makers to evaluate and assess possible IT outsourc...

  3. The Trust-Committment-Flexibility Link in Transnational Buyer-Supplier Relationships: A Network Perspective

    Directory of Open Access Journals (Sweden)

    Matevž Rašković

    2015-06-01

    Full Text Available The purpose of this paper is to analyze the manner in which trust and commitment impact relationship flexibility in a transnational buyer-supplier network context. There is an abundance of research on trust and commitment related to buyer-supplier relationships in the marketing literature; however, their link to relationship flexibility in particular has not attracted much attention within the marketing field to date. Whereas the marketing literature tends to focus on traditional performance outcomes in buyer-supplier relationships (i.e. financial performance, satisfaction, loyalty, the supply chain management literature emphasizes the importance of flexibility as fundamental characteristics of well-performing supply networks. In this paper, a novel network analysis approach is employed for the marketing literature to analyze the link between trust, commitment and relationship flexibility. The analyzed network is a two-mode, egocentric and valued network, consisting of 11 purchasing managers and 53 suppliers connected to a transnational company in the steel construction industry with headquarters in Slovenia. To analyze the impact of trust and commitment on buyer-supplier relationship flexibility, a Multiple Regression Quadratic Assignment Procedure (MRQAP approach was used. Results show that trust and commitment are not just important determinants of buyer-supplier relationship flexibility in a network context, but also how their impact on relationship flexibility changes depending on the importance of the buyer-supplier relationship. In high importance relationships trust is the overwhelming determinant of relationship flexibility, while in low importance relationships commitment is a more important determinant of relationship flexibility.

  4. Studying the emerging nuclear suppliers

    International Nuclear Information System (INIS)

    Rydell, R.F.

    1990-01-01

    None of these events---nor any of the many others that are cited in the case studies of this book---can be singled out as heralding a revolutionary transformation of the global nuclear marketplace. The cumulative effect of such developments, however, may well be the emergence of a market in the year 2000 that is far less concentrated than today's market for nuclear reactors and fuel cycle technology. If this gradual structural transformation is accompanied by the entry into the market of new buyers and sellers that do not accept the Nuclear Non-Proliferation Treaty (NPT), safeguards administered by the IAEA, or other international norms directed at preventing the spread of nuclear weapon capabilities, the result may indeed have revolutionary dimensions for the business, diplomacy, and research of nuclear energy. A similar outcome could arise even f these norms are widely accepted but are not matched by an increase in the resources available to national governments and key international agencies that implement these norms. This paper identifies some of the pitfalls that researchers often encounter in researching the emerging suppliers and will outline some basic ground rules to guide the collection and interpretation of empirical evidence on supplier behavior

  5. A mathematical model for order splitting in a multiple supplier single-item inventory system

    DEFF Research Database (Denmark)

    Abginehchi, Soheil; Farahani, Reza Zanjirani; Rezapour, Shabnam

    2013-01-01

    systems. The item acquisition lead times of suppliers are random variables. Backorder is allowed and shortage cost is charged based on not only per unit in shortage but also per time unit. Continuous review (s,Q) policy has been assumed. When the inventory level depletes to a reorder level, the total...... order is split among n suppliers. Since the suppliers have different characteristics, the quantity ordered to different suppliers may be different. The problem is to determine the reorder level and quantity ordered to each supplier so that the expected total cost per time unit, including ordering cost......, procurement cost, inventory holding cost, and shortage cost, is minimized. We also conduct extensive numerical experiments to show the advantages of our model compared with the models in the literature. According to our extensive experiments, the model developed in this paper is the best model...

  6. Supplier-induced demand as strategic framing

    NARCIS (Netherlands)

    De Jaegher, K.J.M.

    2010-01-01

    This paper develops a model of supplier-induced demand as strategic framing where the patient has reference-dependent references, and the physician can persuade the patient to buy a treatment by affecting the patient’s reference point. In the main result, the patient is assumed to have a constant

  7. Watts Up? Pro AC Power Meter for Automated Energy Recording: A Product Review

    OpenAIRE

    Hirst, Jason M.; Miller, Jonathan R.; Kaplan, Brent A.; Reed, Derek D.

    2013-01-01

    The purpose of the present paper is to review the Watts up? Pro AC power meter. Evaluations of the meter's reliability for measuring energy consumption by consumer electronics yielded acceptable levels of reliability. Implications and limitations for the use of this product in behavior analytic research and practice are discussed.

  8. Intellectual Capital and Innovation Performance: Empirical Evidence in the Turkish Automotive Supplier

    Directory of Open Access Journals (Sweden)

    Muammer Zerenler

    2008-12-01

    Full Text Available The purpose of this study was to investigate the influence of intellectual capital of Turkish automotive supplier industry upon their innovation performance. This study showed that three types of intellectual capital – employee capital, structural capital, and customer capital – had a significantly positive relationship with innovation performance. Moreover, the results also indicated that the higher the growth rate of an industry, the stronger were the positive relationships between three types of intellectual capital and innovation performance. Besides, customer capital was the greatest among these three types of intellectual capital in Turkish automotive supplier industry, employee capital was the next, and structural capital was the least. This shows two points; first, Turkish automotive supplier industry emphasized the interactive “relations” with their suppliers, clients, and partners; second, it was imperative for Turkish manufacturing enterprises to develop their structural capital to increase their innovation performance.

  9. Dukungan Manajemen Puncak terhadap Strategic Purchasing dalam Berkomunikasi dan Berkolaborasi dengan Supplier untuk Meningkatkan Kinerja Perusahaan

    Directory of Open Access Journals (Sweden)

    Zeplin Jiwa Husada Tarigan

    2009-01-01

    Full Text Available The relationship between buyers and suppliers has received considerable attention in recent years. There are fourth major questions being discussed in this research, i.e. firstly, how to determine the support of the top management to influence strategic purchasing; secondly, how to determine the influence of strategic purchasing to good communication and collaboration with supplier; and thirdly, how to determine the influence of communication and collaboration to supplier involvement; and the last, how to increase enterprise performance by collaboration and supplier involvement. Based on previous research, it is found that top management support influenced to strategic purchasing and effect to communication and collaboration and affect to supplier involvement. Collaboration and supplier involvement have been to influence enterprise performance. According survey by questionnaires to 105 respondent and 98 completed questionnaires were returned. Two responses were considered incomplete and had to be discarded, and this left 96 valid responses. It is found, top management support as an organization don’t have influenced strategic purchasing, but strategic purchasing have impact to communication and collaboration to supplier involvement. Collaboration will bring significant contribution to increase performance, even without the supplier involvement.

  10. Yarn supplier selection using analytical hierarchy process (AHP) and standardized unitless rating (SUR) method on textile industry

    Science.gov (United States)

    Erfaisalsyah, M. H.; Mansur, A.; Khasanah, A. U.

    2017-11-01

    For a company which engaged in the textile field, specify the supplier of raw materials for production is one important part of supply chain management which can affect the company's business processes. This study aims to identify the best suppliers of raw material suppliers of yarn for PC. PKBI based on several criteria. In this study, the integration between the Analytical Hierarchy Process (AHP) and the Standardized Unitless Rating (SUR) are used to assess the performance of the suppliers. By using AHP, it can be known the value of the relative weighting of each criterion. While SUR shows the sequence performance value of the supplier. The result of supplier ranking calculation can be used to know the strengths and weaknesses of each supplier based on its performance criteria. From the final result, it can be known which suppliers should improve their performance in order to create long term cooperation with the company.

  11. Weekly changes of power supplier - consequences for the network owner

    International Nuclear Information System (INIS)

    Graabak, Ingeborg

    1997-01-01

    In Norway, it is expected that owners of electric distribution networks will be required to make it possible for the customers to change supplier each week. This report examines what consequences such a requirement will have for the network owners. An inquiry among nine network owners shows that at present changing supplier implies a great deal of manual work on the part of the network owner since many do not have computer based tools adapted to handle the situation. If the number of weekly changes of suppliers does not increase beyond a few percent of the network owner's total number of customers over 1 to 3 years, the network owner can cope with the situation. However, if for some reason the increase becomes larger, many network owners will have great problems because they lack the necessary computer tools. 1 table

  12. Modelling of electric characteristics of 150-watt peak solar panel using Boltzmann sigmoid function under various temperature and irradiance

    Science.gov (United States)

    Sapteka, A. A. N. G.; Narottama, A. A. N. M.; Winarta, A.; Amerta Yasa, K.; Priambodo, P. S.; Putra, N.

    2018-01-01

    Solar energy utilized with solar panel is a renewable energy that needs to be studied further. The site nearest to the equator, it is not surprising, receives the highest solar energy. In this paper, a modelling of electrical characteristics of 150-Watt peak solar panels using Boltzmann sigmoid function under various temperature and irradiance is reported. Current, voltage, temperature and irradiance data in Denpasar, a city located at just south of equator, was collected. Solar power meter is used to measure irradiance level, meanwhile digital thermometer is used to measure temperature of front and back panels. Short circuit current and open circuit voltage data was also collected at different temperature and irradiance level. Statistically, the electrical characteristics of 150-Watt peak solar panel can be modelled using Boltzmann sigmoid function with good fit. Therefore, it can be concluded that Boltzmann sigmoid function might be used to determine current and voltage characteristics of 150-Watt peak solar panel under various temperature and irradiance.

  13. Building partnerships with suppliers as a new trend in management

    OpenAIRE

    Weiss Elżbieta; Tyszkiewicz Rafał

    2016-01-01

    The main objective of the paper is to show the importance of building partnerships with suppliers, and to present the results of research verifying the following hypothesis: Most of the furniture industry companies in Lower Silesia take into account the partnership relations with suppliers in their formulated business strategy. The study was carried out using CATI method and included a research sample consisting of 110 enterprises of Lower Silesia. Enterprises were selected using the purposiv...

  14. Sistem Pendukung Keputusan Dalam Menentukan Supplier Jeruk Pontianak Berbasis Fuzzy-AHP

    Directory of Open Access Journals (Sweden)

    Salahuddin Salahuddin

    2013-01-01

    Full Text Available Orange fruit siam Pontianak or usually called Pontianak ,it is very popular to the people and the fruit itself is very favorite of many people in Indonesia because of its taste which is so sweet and a little sour and refresing. The competition of orange in industries is becoming more intense. The high preference to this orange makes it a demand in most markets  to the food industries, farmacy industry and local(traditional medicine has point out that supplier of this orange is meeting importan factor that quarantee direct to the company. The collection of data in this survey and the sample of orange from every area is capable of producing orange Pontianak in the province of West Kalimantan. In this research will analyst the area supplier in producing standardize orange founded on the quality and the appropriate criteria based on the SNI. The method that is used is Fuzzy-AHP with weighting non-additive.The result that is used Fuzzy AHP non-additive in stating supplier of the orange pontianak in showing, attractive criteria, hygienic,sizes, marketing, , rotting is the first criteria which is undetake for giving the supplier quality orange. In examining the level of consistency using the method Fuzzy AHP non-additive is made in every structural level, hierarchal system is capable of handling the non consistency in the end testing, then will obtained the best supplier with important criteria for the company.

  15. Auditing of suppliers as the requirement of quality management systems in construction

    Science.gov (United States)

    Harasymiuk, Jolanta; Barski, Janusz

    2017-07-01

    The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.

  16. A Qualitative Study into the Supplier Selection Decision-Making Process in the Malaysian SME Manufacturing Industry

    OpenAIRE

    Rahaman, F.J.

    2017-01-01

    In manufacturing, supplier selection is viewed as the foundation of supply chain management, as the choice of the supplier will inherently affect all other aspects of business. This study explores the supplier selection decision-making process within Malaysian manufacturing firms. Previous studies in supplier selection have focused on company performance and quality management. Preceding research in this field, offers evidence that the application of information technology tools, business int...

  17. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  18. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to

  19. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    International Nuclear Information System (INIS)

    Walker, Randy M.; Gross, Ian G.; Smith, Cyrus M.; Hill, David E.

    2011-01-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  20. SUPPLIER SELECTION STRATEGY AND MANUFACTURING FLEXIBILITY: IMPACT OF QUALITY AND TECHNOLOGY ROADMAPS

    Directory of Open Access Journals (Sweden)

    Muhamad Jantan

    2006-01-01

    Full Text Available The study evaluates the relationship between technology, quality, cost and delivery performance-based, supplier selection strategies, and manufacturing flexibilities namely, product flexibility, launch flexibility, and volume flexibility. Moreover, the moderating impact of supplier management strategies, namely quality roadmap and technology roadmap on the above relationships were also explored. The data for the study was drawn from a sample of companies listed in the factory directory published by the Penang Development Corporation (PDC. A postal survey of 120 manufacturers provided a return of 92 usable responses. The results reveal that the selection of suppliers based on technological and quality performance positively affects all the three dimensions of manufacturing flexibility, with complementary effects of good technology and quality roadmaps. Technology and quality roadmaps act as predictors for product and volume flexibilities. However, when launch flexibility is the focus, both technology and quality roadmaps moderate the impact of supplier selection strategies. Details of the findings, theoretical and practical implications, and the research limitation are discussed.

  1. Neural network ensemble based supplier evaluation model in line with nuclear safety conditions

    International Nuclear Information System (INIS)

    Wang Yonggang; Chang Baosheng

    2006-01-01

    Nuclear safety is the most critical target for nuclear power plant operation. Besides the rigid operation procedures established, evaluation of suppliers working with plants can be another important aspects. Selection and evaluation of suppliers can be classified with qualitative analysis and quantitative management. The indicators involved are coupled with each other in a very complicated manner, therefore the relevant data show the strong characteristic of non-linearity. The article is based on the research and analysis of the real conditions of the Daya Bay nuclear power plant operation management. Through study and analysis of the information home and abroad, and with reference to the neural network ensemble technology, the supplier evaluation system and model are established as illustrated within the paper, thus to heighten objectivity of the supplier selection. (authors)

  2. Multi-Watt Near-Infrared Phototherapy for the Treatment of Comorbid Depression: An Open-Label Single-Arm Study

    Directory of Open Access Journals (Sweden)

    Theodore A. Henderson

    2017-09-01

    Full Text Available BackgroundThe treatment of depression has been hampered by low efficacy of antidepressant medications and safety concerns with alternative modalities. Recent work demonstrated that multi-Watt transcranial near-infrared light therapy (NILT can effectively treat traumatic brain injury (TBI. The current objective is to explore multi-Watt NILT efficacy in a proof-of-concept study as a treatment for depression.MethodsThirty-nine sequential patients treated for TBI between March 2013 and May 2017 provided depression self-assessment data and/or were administered the Hamilton depression rating scale. Each completed the Quick Inventory of Depression Symptomatology-Self Report (QIDS before and after treatment. Patients received multi-Watt NILT using near-infrared lasers (810/980 nm at 8–15 W applied to forehead and temporal regions bilaterally for 9–12 min to each area. Pre- and posttreatment scores were analyzed by paired t-tests.ResultsAll met QIDS criteria for mild to severe depression and 69% had prior antidepressant trials. For 36 of the 39 patients, after 16.82 ± 6.26 treatments, QIDS scores indicated a robust response (decrease of QIDS total score by ≥50%. For 32 of 39 patients, posttreatment QIDS scores indicated a remission from depression (decrease of QIDS total score ≤5. Overall, the QIDS score fell from 14.10 ± 3.39 to 3.41 ± 3.30 SD (p = 6.29 × 10−19. With 12 or fewer treatments, QIDS score dropped from 14.83 ± 2.55 to 4.17 ± 3.93. Patients receiving ≥13 treatments showed a change in QIDS score from 13.67 ± 3.64 to 3.11 ± 3.14. Those (N = 15 who received the entire treatment course within ≤8 weeks (5.33 ± 1.72 weeks showed a change in QIDS score from 13.86 ± 3.14 to 4.5 ± 3.94. Suicidal ideation resolved in all, but two patients. Patients remained in remission for up to 55 months after a single course of treatment.ConclusionThis is the first report of

  3. On competition in a Stackelberg location-design model with deterministic supplier choice

    NARCIS (Netherlands)

    Hendrix, E.M.T.

    2016-01-01

    We study a market situation where two firms maximize market capture by deciding on the location in the plane and investing in a competing quality against investment cost. Clients choose one of the suppliers; i.e. deterministic supplier choice. To study this situation, a game theoretic model is

  4. Japanese suppliers in transition from domestic nuclear reactor vendors to international suppliers

    International Nuclear Information System (INIS)

    Forsberg, C.W.; Reich, W.J.; Rowan, W.J.

    1994-01-01

    Japan is emerging as a major leader and exporter of nuclear power technology. In the 1990s, Japan has the largest and strongest nuclear power supply industry worldwide as a result of the largest domestic nuclear power plant construction program. The Japanese nuclear power supply industry has moved from dependence on foreign technology to developing, design, building, and operating its own power plants. This report describes the Japanese nuclear power supply industry and examines one supplier--the Mitsubishi group--to develop an understanding of the supply industry and its relationship to the utilities, government, and other organizations

  5. Japanese suppliers in transition from domestic nuclear reactor vendors to international suppliers

    Energy Technology Data Exchange (ETDEWEB)

    Forsberg, C.W.; Reich, W.J.; Rowan, W.J.

    1994-06-27

    Japan is emerging as a major leader and exporter of nuclear power technology. In the 1990s, Japan has the largest and strongest nuclear power supply industry worldwide as a result of the largest domestic nuclear power plant construction program. The Japanese nuclear power supply industry has moved from dependence on foreign technology to developing, design, building, and operating its own power plants. This report describes the Japanese nuclear power supply industry and examines one supplier--the Mitsubishi group--to develop an understanding of the supply industry and its relationship to the utilities, government, and other organizations.

  6. Specification of optical components for a high average-power laser environment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, J.R.; Chow, R.; Rinmdahl, K.A.; Willis, J.B.; Wong, J.N.

    1997-06-25

    Optical component specifications for the high-average-power lasers and transport system used in the Atomic Vapor Laser Isotope Separation (AVLIS) plant must address demanding system performance requirements. The need for high performance optics has to be balanced against the practical desire to reduce the supply risks of cost and schedule. This is addressed in optical system design, careful planning with the optical industry, demonstration of plant quality parts, qualification of optical suppliers and processes, comprehensive procedures for evaluation and test, and a plan for corrective action.

  7. A Hybrid Multiple Criteria Group Decision-Making Approach for Green Supplier Selection in the TFT-LCD Industry

    Directory of Open Access Journals (Sweden)

    Che-Wei Tsui

    2014-01-01

    Full Text Available The awareness of the need for environmental protection is increasing throughout the world. The focuses of green supplier selection are on considering environmental criteria and strengthening the competitiveness of the entire supply chain. The purpose of this study is to develop a green supplier selection procedure for the thin film transistor liquid crystal display (TFT-LCD industry using polarizer suppliers as an example. First, a decision framework for green supplier selection is developed based on literatures and the supplier audit forms provided by an anonymous flat panel display manufacturer in Taiwan. Then, a hybrid multiple criteria group decision-making (MCGDM method is proposed based on analytic hierarchy process (AHP, entropy, elimination and choice expressing the reality III (ELECTRE III, and the linear assignment method to assist the manufacturer in choosing among four polarizer suppliers. The final ranking results for green supplier selection and different opinions from each department are provided. An improvement report is suggested to enhance suppliers’ performance. For the evaluation procedure, most managers emphasize the importance of current capability and the capability of research and development. Furthermore, we found that the subsidiary supplier should improve quality control competence immediately to be considered as the potential candidate of primary supplier.

  8. Supplier Relationship Management at Army Life Cycle Management Commands: Gap Analysis of Best Practices

    Science.gov (United States)

    2012-01-01

    contracts. - 76 - In step 9, maintaining momentum in supplier management , the relationship between the customer and supplier continues to develop...REPORT DATE 2012 2. REPORT TYPE 3. DATES COVERED 00-00-2012 to 00-00-2012 4. TITLE AND SUBTITLE Supplier Relationship Management at Army Life... Relationship Management at Army Life Cycle Management Commands Gap Analysis of Best Practices Nancy Y. Moore, Amy G. Cox, Clifford A. Grammich

  9. Development of 350 MHz/1000 Watt intermediate power amplifier for 400 keV RFQ accelerator

    International Nuclear Information System (INIS)

    Pande, M.M.; Patel, N.R.; Shinde, K.R.; Rao, M.K.V.; Handu, V.K.

    2005-01-01

    Two numbers of high power RF systems, each delivering around 35 to 40 kW of power at 350 MHz are being developed in BARC. These High Power Amplifiers (HPA) cater to the total need of 70 kW of RF power required by the 400 keV (Deuterium) RFQ accelerator. This RFQ will replace the existing 400 keV DC accelerator of 14 MeV Neutron Generator. The RFQ will accelerate a deuterium beam from 50 keV to 400 keV to impinge upon a tritium target inside a sub critical assembly. Each of these 35 / 40 KW HPA requires a drive power of around 1000 / 1500 Watt respectively. Hence a intermediate power amplifier (IPA) bas been designed to deliver the power of 1000 Watt at the rate of 350 MHz. The paper describes the development of this amplifier

  10. Watts Bar Unit 2 Startup Results with VERA

    Energy Technology Data Exchange (ETDEWEB)

    Godfrey, Andrew T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Collins, Benjamin S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gentry, Cole A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stimpson, Shane G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ritchie, John A. [Tennessee Valley Authority (TVA), Knoxville, TN (United States)

    2017-03-01

    CASL members TVA, Westinghouse, and Oak Ridge National Laboratory have successfully completed a detailed simulation of the initial startup of Watts Bar Nuclear Unit 2 (WBN2) using the advanced reactor simulation tools known as VERA. WBN2 is the first commercial power reactor to join the nation’s electrical grid in over two decades, and the modern core design and availability of data make it an excellent benchmark for CASL. Calculations were performed three months prior to the startup, and in the first blind application of VERA to a new reactor, predicted criticality and physics parameters very close to those later measured by TVA. Subsequent calculations with the latest version of VERA and using exact measurement conditions improved the results even further.

  11. The role of a multinational nuclear fuel fabrication supplier

    International Nuclear Information System (INIS)

    Beard, S.J.

    1987-01-01

    The author argues that international markets and multinational suppliers provide large benefits to utilities. It represents a long term commitment to the nuclear business that these companies will be able to supply nuclear technology on the long haul. The technology that is available around the world becomes available to everyone through the international markets and multinational suppliers. The increased experience base is seen as valuable in that errors that have been made or have not been made yet can be avoided through the transfer or experience. The security of supply is discussed as important to any utility that is operating a reactor

  12. Perceptions of technology uncertainty and the consequences for performance in buyer-supplier relationships

    NARCIS (Netherlands)

    Oosterhuis, M.; van der Vaart, T.; Molleman, E.

    2011-01-01

    In this paper, we investigate how buyers' and suppliers' distinct perceptions of technology uncertainty affect the relationship between communication frequency and supplier performance. Information processing theory suggests that a fit is desirable between perceived environmental uncertainty and the

  13. Profiles of Major Suppliers to the Automotive Industry : Vol. 2. Iron, Steel and Aluminum Suppliers to the Automotive Industry

    Science.gov (United States)

    1982-08-01

    This study summarizes extensive information collected over a two-year period (October 1978 to October 1980) on suppliers of parts and components, materials, and machine tools to the automotive industry in the United States. The objective of the study...

  14. Quantifying the supplier-portfolio diversity of embodied energy: Strategic implications for strengthening energy resilience

    International Nuclear Information System (INIS)

    Sato, Masahiro; Kharrazi, Ali; Nakayama, Hirofumi; Kraines, Steven; Yarime, Masaru

    2017-01-01

    This paper investigates energy resilience of countries by quantifying the supplier diversification of both direct and embodied energy import. In particular, we quantify two approaches to diversify a country's supplier portfolio: by lowering the dependency on each supplier (portfolio diversification) and by having embodied energy suppliers that are different from its direct energy suppliers (portfolio differentiation). We examine possibilities for strategic utilization of embodied energy trade to compensate for low diversity of direct energy trade for three types of fossil resources: coal, oil, and gas. We find that the diversity of embodied energy import is much greater than that of direct energy import. Of the three energy resources, coal enables countries to adopt portfolio diversification and portfolio differentiation more than gas and oil. Our results suggest embodied energy can be considered as a transfer of energy resources across national borders that can directly benefit from the diversity of the world energy production by “skipping” the limited diversity of the world energy export. - Highlights: • We quantify the diversity of countries’ supplier-portfolios of embodied energy. • The diversities of embodied energy import are greater than direct energy import. • Embodied energy is energy transfer that “skips” limited diversity of energy trade.

  15. The Sustainability of Global Chain Governance: Network Structures and Local Supplier Upgrading in Thailand

    Directory of Open Access Journals (Sweden)

    Sungchul Cho

    2016-09-01

    Full Text Available Although it has been widely accepted that insertion into global production networks may play a critical role in fostering local supplier upgrading, scholars have yet to fully incorporate heterogeneous configurations of buyer-supplier relationships within networks into empirical testing. Using a representative sample of manufacturing firms in Thailand, we propose a more nuanced empirical framework that asks which features of buyer-supplier relationships are related to which aspects of local supplier upgrading. Our findings, derived from latent class analysis, show that the ways value chains are governed can exert varying effects on different types of technological upgrading. Being a multinational corporation (MNC supplier was found to have positive effects on process and minor product upgrading, irrespective of the types of buyer-supplier networks. However, we found a more radical type of upgrading (i.e., the development of own brands to be negatively related to insertion into ‘quasi-hierarchical’ or ‘buyer-driven relationships’, whilst involvement in ‘cooperative networks’ was associated with a significantly higher tendency of product and brand upgrading. Understanding this inherent relationality provides a crucial balance to previous firm-level findings, suggesting that the sustainability of participation in global value chains depends on the relational structures in which local manufacturers are embedded.

  16. The new regulator in town : The effect of Walmart’s sustainability mandate on supplier shareholder value

    NARCIS (Netherlands)

    Gielens, K.J.P.; Geyskens, Inge; Deleersnyder, Barbara; Nohe, Max

    Suppliers are increasingly forced by dominant retailers to clean up their supply chains. While these retailers argue that their sustainability mandates may translate into profits for suppliers, many suppliers are cynical about these mandates because the onus to undertake the required investments is

  17. Statistical analysis and planning of multihundred-watt impact tests

    International Nuclear Information System (INIS)

    Martz, H.F. Jr.; Waterman, M.S.

    1977-10-01

    Modular multihundred-watt (MHW) radioisotope thermoelectric generators (RTG's) are used as a power source for spacecraft. Due to possible environmental contamination by radioactive materials, numerous tests are required to determine and verify the safety of the RTG. There are results available from 27 fueled MHW impact tests regarding hoop failure, fingerprint failure, and fuel failure. Data from the 27 tests are statistically analyzed for relationships that exist between the test design variables and the failure types. Next, these relationships are used to develop a statistical procedure for planning and conducting either future MHW impact tests or similar tests on other RTG fuel sources. Finally, some conclusions are given

  18. Supplier Selection for Food Industry: A Combination of Taguchi Loss Function and Fuzzy Analytical Hierarchy Process

    OpenAIRE

    Renna Magdalena

    2012-01-01

    Supplier selection is an important part of supply chain management process by which firms identify, evaluate, and establish contracts with suppliers. Deciding the right supplier can be a complex task. As such, various criteria must be taken into account to choose the best supplier. This study focused on the supply in the packaging division of a food industry in Denpasar-Bali. A combination of Taguchi Loss Function and fuzzy-AHP (Analytical Hierarchy Process Fuzzy Linear Programming) was used ...

  19. Liability of suppliers to nuclear power plants in Western Europe

    International Nuclear Information System (INIS)

    Kuhn, W.

    1988-01-01

    The Paris Convention provides that liability for a nuclear incident is channelled onto the operator of the nuclear installation concerned. However, the author analyses in which cases and by what mechanisms, the operator can have a right of recourse against a supplier of that installation. He illustrates, by several scenarios of nuclear incident with transfrontier effects how a supplier may be held liable, and describes the relevant rules of law applicable, based on private international law and tort law principles (NEA) [fr

  20. A simulated annealing approach to supplier selection aware inventory planning

    OpenAIRE

    Turk, Seda; Miller, Simon; Özcan, Ender; John, Robert

    2015-01-01

    Selection of an appropriate supplier is a crucial and challenging task in the effective management of a supply chain. Also, appropriate inventory management is critical to the success of a supply chain operation. In recent years, there has been a growing interest in the area of selection of an appropriate vendor and creating good inventory planning using supplier selection information. In this paper, we consider both of these tasks in a two-stage approach employing Interval Type-2 Fuzzy Sets ...

  1. Coordination of a Random Yield Supply Chain with a Loss-Averse Supplier

    Directory of Open Access Journals (Sweden)

    Jiarong Luo

    2015-01-01

    Full Text Available This paper investigates the coordination of a supply chain consisting of a loss-averse supplier and a risk-neutral buyer who orders products from the supplier who suffers from random yield to meet a deterministic demand. We derive the risk-neutral buyer’s optimal order policy and the loss-averse supplier’s optimal production policy under shortage-penalty-surplus-subsidy (SPSS contracts. We also analyze the impacts of loss aversion on the loss-averse supplier’s production decision making and find that the loss-averse supplier may produce less than, equal to, or more than the risk-neutral supplier. Then, we provide explicit conditions on which the random yield supply chain with a loss-averse supplier can be coordinated under SPSS contracts. Finally, adopting numerical examples, we find that when the shortage penalty is low, the buyer’s optimal order quantity will increase, while the supplier’s optimal production quantity will first decrease and then increase as the loss aversion level increases. When the shortage penalty is high, the buyer’s optimal order quantity will decrease but the supplier’s optimal production quantity will always increase as the loss aversion level increases. Furthermore, the numerical examples provide strong evidence for the view that SPSS contracts can effectively improve the performance of the whole supply chain.

  2. A parallel optimization method for product configuration and supplier selection based on interval

    Science.gov (United States)

    Zheng, Jian; Zhang, Meng; Li, Guoxi

    2017-06-01

    In the process of design and manufacturing, product configuration is an important way of product development, and supplier selection is an essential component of supply chain management. To reduce the risk of procurement and maximize the profits of enterprises, this study proposes to combine the product configuration and supplier selection, and express the multiple uncertainties as interval numbers. An integrated optimization model of interval product configuration and supplier selection was established, and NSGA-II was put forward to locate the Pareto-optimal solutions to the interval multiobjective optimization model.

  3. Supplier Partnership Strategy and Global Competitiveness: A Case of Samsung Electronics

    Directory of Open Access Journals (Sweden)

    Jangwoo Lee

    2015-11-01

    Full Text Available Samsung Group has accelerated its management innovation process, following the announcement of ‘New Management’ by the CEO Lee Kun-Hee. Particular attention must be paid to the smart-phone business of Samsung Electronics, which is the core company of the Samsung Group. In 2009, as Apple entered into the Korean market, the domestic smart-phone market faced the so called ‘Apple Shock’ due to its choice of a monopolistic and closed operating system. In response, Samsung Electronics introduced the innovative Galaxy series, replacing the old model of Omnia series. This move reaped dramatic success by dominating the world smart-phone market. Samsung Electronics ranked first in the 2012 world smart-phone market, and in 2013 it sold over 300 million devices for the first time in history, thereby solidifying the number one spot with a market share of 32.3%. Samsung Electronics’ achievement in its management innovation process was successful, due to its internal innovation and its partnership with sub-suppliers. Samsung Electronics strengthened its supplier partnership strategy, which in turn, led to an internalization of subparts assembly and process technology. By conducting the final assembly process on its own, it established the global supply chain that accompanies a high level of efficiency and operational elasticity. Samsung Electronics successfully systemized several hundred suppliers into an effective partnership and created an eco system where cooperation and competition can co-exist in its supply chain network. In sum, Samsung Electronics has successfully created the Samsung Production System that brings an economy of scale and allows prompt response. On the other hand, Apple did not get involved with subparts production, besides design and product design. This research identifies the effectiveness of Samsung Electronics’ supplier partnerships in its global competitiveness by examining characteristics of supplier partnership

  4. Profiles of Major Suppliers to the Automotive Industry : Vol. 3. Plastics, Glass and Fiberglass Suppliers to the Automotive Industry

    Science.gov (United States)

    1982-08-01

    This study summarizes extensive information collected over a two-year period (October 1978 to 1980) on suppliers of parts and components, materials, and machine tools to the automotive industry in the United States. The objective of the study was to ...

  5. Simple, cost effective & result oriented framework for supplier performance measurement in sports goods manufacturing industry

    Directory of Open Access Journals (Sweden)

    2011-09-01

    Full Text Available The emergences of global markets have increased competition worldwide. For the Sports Goods Manufacturing Industry which is considered to be an intensive supplier base industry with limited resources to sustain in what is already a very competitive market there is a need for the entire supply chain viz. raw material and machinery suppliers and manufacturers to measure their supplier's performance to reduce business risks and revenue losses. How to design & execute a simple, cost effective & result oriented Framework for Supplier Performance Measurement for sports goods manufacturing small - medium enterprises is the main aim of this research paper.

  6. Analysis of equilibrium about bidding strategy of suppliers with future contracts

    International Nuclear Information System (INIS)

    Yuan, Zhiqiang; Liu, Dong; Jiang, Chuanwen

    2007-01-01

    In this paper, the supply function model is employed to simulate the bidding strategy of suppliers in the power pool, and models of the supply function with future contracts are presented. It is proved that only one of the parameters between slope and intercept of the bidding curve is an independent variable in order to achieve definite equilibrium. In the meantime, the equilibria of the bidding strategy about suppliers are studied when different intercepts of the bidding curve are chosen. Some examples are employed to study the Nash equilibrium strategies of suppliers with different future contracts in various bidding strategy models. The results show that the equilibria are different in different bidding strategy models, but the future contracts can effectively make spot prices decrease in all the models

  7. High-average-power 2 μm few-cycle optical parametric chirped pulse amplifier at 100 kHz repetition rate.

    Science.gov (United States)

    Shamir, Yariv; Rothhardt, Jan; Hädrich, Steffen; Demmler, Stefan; Tschernajew, Maxim; Limpert, Jens; Tünnermann, Andreas

    2015-12-01

    Sources of long wavelengths few-cycle high repetition rate pulses are becoming increasingly important for a plethora of applications, e.g., in high-field physics. Here, we report on the realization of a tunable optical parametric chirped pulse amplifier at 100 kHz repetition rate. At a central wavelength of 2 μm, the system delivered 33 fs pulses and a 6 W average power corresponding to 60 μJ pulse energy with gigawatt-level peak powers. Idler absorption and its crystal heating is experimentally investigated for a BBO. Strategies for further power scaling to several tens of watts of average power are discussed.

  8. Supplier Cooperation in Drone Delivery

    OpenAIRE

    Sawadsitang, Suttinee; Niyato, Dusit; Siew, Tan Puay; Wang, Ping

    2018-01-01

    Recently, unmanned aerial vehicles (UAVs), also known as drones, has emerged as an efficient and cost-effective solution for package delivery. Especially, drones are expected to incur lower cost, and achieve fast and environment friendly delivery. While most of existing drone research concentrates on surveillance applications, few works studied the drone package delivery planning problem. Even so, the previous works only focus on the drone delivery planning of a single supplier. In this paper...

  9. Fuzzy Axiomatic Design approach based green supplier selection

    DEFF Research Database (Denmark)

    Kannan, Devika; Govindan, Kannan; Rajendran, Sivakumar

    2015-01-01

    proposes a multi-criteria decision-making (MCDM) approach called Fuzzy Axiomatic Design (FAD) to select the best green supplier for Singapore-based plastic manufacturing company. At first, the environmental criteria was developed along with the traditional criteria based on the literature review......Abstract Green Supply Chain Management (GSCM) is a developing concept recently utilized by manufacturing firms of all sizes. All industries, small or large, seek improvements in the purchasing of raw materials, manufacturing, allocation, transportation efficiency, in curbing storage time, importing...... responsible in addition to being efficiently managed. A significant way to implement responsible GSCM is to reconsider, in innovative ways, the purchase and supply cycle, and a preliminary step would be to ensure that the supplier of goods successfully incorporates green criteria. Therefore, this paper...

  10. Penerapan Metode Ahp untuk Subsistem Pendukung Pemilihan Supplier pada Outhouse Costing Integrated System (Ocis di Pt Adm

    Directory of Open Access Journals (Sweden)

    Surja Surjandy

    2014-06-01

    Full Text Available In general automotive development, especially car, PT Astra Daihatsu Motor (ADM continuously improves quality and service to supply vehicles in Indonesia. To support the improvement of quality and service, PT ADM continues to improve technology-based system to assist in providing vehicle parts of production process requirements. Therefore Purchasing division is very important in this process. Besides, supplier is a very important role in making and supplying parts for the company. PT ADM has a new system used to improve bidding process. Based on the discussion, price was not the only thing significant. There were other things to consider, especially in selecting the right supplier.  Realizing the system does not cover all areas, therefore, it needs Decision Support System with AHP method to filter suppliers. So that, the company will automatically have good supplier. At least, the supplier meets company standard, especially purchasing department. This research concludes that using AHP Method is very effective for filtering supplier so that the company can make sure that only capable supplier or supplier which meets company standard may join the tender to supply the goods or parts. This paper combined AHP Methodology as the first selection using pairwise scoring and Analysis Sensitivity Methodology used to take decision which supplier is in line with project requirements.

  11. Vertical Cost-Information Sharing in a Food Supply Chain with Multiple Unreliable Suppliers and Two Manufacturers

    Directory of Open Access Journals (Sweden)

    Junjian Wu

    2017-01-01

    Full Text Available This paper considers a food supply chain where multiple suppliers provide completely substitutable food products to two manufacturers. Meanwhile, the suppliers face yield uncertainty and the manufacturers face uncertain production costs that are private information. While the suppliers compete on price, the manufacturers compete on quantity. We build a stylized multistage game theoretic model to analyze the issue of vertical cost-information sharing (VCIS within the supply chain by considering key parameters, including the level of yield uncertainty, two manufacturers’ cost correlation, the correlated coefficient of suppliers’ yield processes, and the number of suppliers. We study the suppliers’ optimal wholesale price and the manufacturers’ optimal order quantities under different VCIS strategies. Finally, through numerical analyses, we examine how key parameters affect the value of VCIS to each supplier and each manufacturer, respectively. We found that the manufacturers are willing to share cost information with suppliers only when the two manufacturers’ cost correlation is less than a threshold. While a high correlated coefficient of suppliers’ yield processes and a large number of suppliers promote complete information sharing, a high level of yield uncertainty hinders complete information sharing. All these findings have important implications to industry practices.

  12. The negaWatt 2011 scenario

    International Nuclear Information System (INIS)

    2016-03-01

    This article presents the approach adopted for the negaWatt scenario and its obtained results. It is based on sobriety (energy savings), on energy efficiency, and on the use of renewable energies. After having outlined the different reasons for an energy transition (increasing energy consumption, critics and risks related to nuclear energy, and high potential of renewable energies), the scenario is presented with its main principles. The scenario identifies possibilities ranging from half to two thirds of energy saving in the different energy consuming sectors. The building sector is presented as a major issue. The transport is described as a sector to be addressed on the long term. The necessary change of the industry sector is highlighted. The agriculture sector is presented as being at the heart of transition. Energy usages are to become sober, efficient and renewable. The scenario is based on a high rate development of renewable energies, while fossil energies are to become marginal, nuclear is to be progressively and reasonably given up, and networks are to become compatible to ensure the scenario success. Thus, the scenario demonstrates the feasibility of a 100 pc sustainable assessment for primary energy, complies with stakes and objectives by 2050. The cost of energy transition is briefly discussed

  13. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT - PHYSICAL REMOVAL OF MICROBIAL CONTAMINATION AGENTS IN DRINKING WATER, WATTS P{REMIER ULTRA 5 REVERSE OSMOSIS DRINKING WATER TREATMENT SYSTEM (POU)

    Science.gov (United States)

    The Watts Premier Ultra 5 system was tested for removal of bacteria and viruses at NSF International's Laboratory. Watts Premier submitted ten units, which were split into two groups of five. One group received 25 days of conditioning prior to challenge testing, while the secon...

  14. Enhancing Buyer-Supplier Collaboration through Daily Conversations at Shopfloor Level

    DEFF Research Database (Denmark)

    Bardon, Thibaut; Arnaud, Nicolas; Villeseche, Florence

    aspect of this interorganizational communication: the conversations that take place between shop-floor employees of partnering firms. Studying such daily conversations in situ affords insights on the foundations of efficient buyer-supplier communication beyond managerial level strategy making. We rely...... on the strategy as practice perspective that emphasizes the strategic role of conversations at all hierarchical levels as a key means by which strategy develops on a daily basis. This paper provides evidence of how daily conversations between shop-floor employees can enhance buyer-supplier collaboration...

  15. A tale of two partnerships : Socialization in the development of buyer-supplier relationships

    NARCIS (Netherlands)

    van de Vijver, M.A.R.; Vos, G.C.J.M.; Akkermans, H.A.

    2011-01-01

    We contribute to the emerging literature on the role of socialization in developing buyer–supplier relationships. We conduct a dyadic, multiple-informant based, longitudinal study of the development of two buyer–supplier relationships. We carry out a detailed examination of the effect of

  16. Don't trust trust : a dynamic approach towards controlling supplier involvement in NPD

    NARCIS (Netherlands)

    Smets, L.P.M.; Oorschot, van K.E.; Langerak, F.

    2013-01-01

    Prior literature stresses the importance for manufacturers to use formal and informal controls to coordinate collaborative new product development activities with suppliers. In doing so, the existence of trust between manufacturers and suppliers is believed to play a key role because it enables

  17. Households' switching behavior between electricity suppliers in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Ek, Kristina; Soederholm, Patrik [Economics Unit, Luleaa University of Technology, 971 87 Luleaa (Sweden)

    2008-12-15

    The overall purpose of this paper is to analyze the factors affecting households' decisions to: (a) switch to a new electricity supplier; and (b) actively renegotiate the electricity contract with the prevailing supplier. The study is based on 536 survey responses from Swedish households and they are analyzed econometrically using probit regression techniques. The analysis is based on a theoretical framework, which embraces both economic and psychological motives behind household decision-making. The results show that households that anticipate significant economic benefits from choosing a more active behavior are also more likely to purse this, while those with smaller potential gains (e.g., households without electric heating) are less likely to change supplier and/or renegotiate their contracts. The impact of overall electricity costs and knowledge about these is particularly important for the latter decision, while respondents that perceive relatively high search and information costs are less likely to switch to an alternative electricity supplier. Moreover, constraints on time, attention, and the ability to process information, may lead to optimizing analyses being replaced by imprecise routines and rules of thumb, and the benefits of the status quo appear to represent one of those simplifying rules. This also opens up for other influences on households' activity such as social interaction and media discourses that raise the attention level. Our results show that these influences are more likely to affect households' choice to switch to new service providers, i.e., the one area of the two investigated here that put the most demand on people's ability to search for and process information. (author)

  18. Exploring the economic consequences of paying a supplier to keep a reserve inventory

    DEFF Research Database (Denmark)

    Abginehchi, Soheil; Larsen, Christian; Thorstenson, Anders

    basis, most often only once per month. In addition lead-times are long, as the suppliers are situated overseas.  Therefore the company must keep all the inventories at considerable costs. The company wishes to make contracts with its suppliers such that they keep some reserve inventory that can...... be accessed (at a higher unit price than the normal one) but also with a shorter lead-time. Furthermore the company must also pay a cost proportional to inventory level for maintaining this reserve inventory. This problem can be considered as an inventory control model with two suppliers. We propose a dynamic......This work inspired by a contact with a larger telecommunication company. Many of the products offered are unique for this company and they also have very short lifetimes, normally about 18 months. Furthermore the suppliers do not wish to keep any inventories and they only accept orders on periodic...

  19. Improved performance of high average power semiconductor arrays for applications in diode pumped solid state lasers

    International Nuclear Information System (INIS)

    Beach, R.; Emanuel, M.; Benett, W.; Freitas, B.; Ciarlo, D.; Carlson, N.; Sutton, S.; Skidmore, J.; Solarz, R.

    1994-01-01

    The average power performance capability of semiconductor diode laser arrays has improved dramatically over the past several years. These performance improvements, combined with cost reductions pursued by LLNL and others in the fabrication and packaging of diode lasers, have continued to reduce the price per average watt of laser diode radiation. Presently, we are at the point where the manufacturers of commercial high average power solid state laser systems used in material processing applications can now seriously consider the replacement of their flashlamp pumps with laser diode pump sources. Additionally, a low cost technique developed and demonstrated at LLNL for optically conditioning the output radiation of diode laser arrays has enabled a new and scalable average power diode-end-pumping architecture that can be simply implemented in diode pumped solid state laser systems (DPSSL's). This development allows the high average power DPSSL designer to look beyond the Nd ion for the first time. Along with high average power DPSSL's which are appropriate for material processing applications, low and intermediate average power DPSSL's are now realizable at low enough costs to be attractive for use in many medical, electronic, and lithographic applications

  20. Outranking methods in support of supplier selection

    NARCIS (Netherlands)

    de Boer, L.; van der Wegen, Leonardus L.M.; Telgen, Jan

    1998-01-01

    Initial purchasing decisions such as make-or-buy decisions and supplier selection are decisions of strategic importance to companies. The nature of these decisions usually is complex and unstructured. Management Science techniques might be helpful tools for this kind of decision making problems. So

  1. Half-Watt average power femtosecond source spanning 3-8 µm based on subharmonic generation in GaAs

    Science.gov (United States)

    Smolski, Viktor; Vasilyev, Sergey; Moskalev, Igor; Mirov, Mike; Ru, Qitian; Muraviev, Andrey; Schunemann, Peter; Mirov, Sergey; Gapontsev, Valentin; Vodopyanov, Konstantin

    2018-06-01

    Frequency combs with a wide instantaneous spectral span covering the 3-20 µm molecular fingerprint region are highly desirable for broadband and high-resolution frequency comb spectroscopy, trace molecular detection, and remote sensing. We demonstrate a novel approach for generating high-average-power middle-infrared (MIR) output suitable for producing frequency combs with an instantaneous spectral coverage close to 1.5 octaves. Our method is based on utilizing a highly-efficient and compact Kerr-lens mode-locked Cr2+:ZnS laser operating at 2.35-µm central wavelength with 6-W average power, 77-fs pulse duration, and high 0.9-GHz repetition rate; to pump a degenerate (subharmonic) optical parametric oscillator (OPO) based on a quasi-phase-matched GaAs crystal. Such subharmonic OPO is a nearly ideal frequency converter capable of extending the benefits of frequency combs based on well-established mode-locked pump lasers to the MIR region through rigorous, phase- and frequency-locked down conversion. We report a 0.5-W output in the form of an ultra-broadband spectrum spanning 3-8 µm measured at 50-dB level.

  2. Coordinating supplier-retailer using multiple common replenishment epochs with retailers’ choices

    Directory of Open Access Journals (Sweden)

    Juhwen Hwang

    2013-06-01

    Full Text Available Purpose: Provide a coordination strategy using multiple common replenishment epochs (MCRE for a single-supplier multi-retailer supply chain. Design/methodology/approach: The demand of a product occurs only with a group of heterogeneous and independent retailers with constant rates, whereas all their order requests are fulfilled by the supplier. The supplier decides a set of MCREs with general price and extra bonus to entice the retailers to join any one of the MCREs, or to let them remain with their original order time epochs. A retailer is willing to participate in a CRE as long as the retailer’s cost increase is within its tolerance. This paper provide a mixed integer programming to determine the MCRE strategies in order to minimize the total costs of the supplier. Findings: The results illustrate that MCRE model provided in the paper can generate a better replenishment coordination scheme than single CRE models. Practical implications: Replenishment coordination is one of the most important mechanisms to improve the efficiency in supply chains, e.g., chain convenience stores in the modern retail industry. Originality/value: This is a follow-up research on Joint Economic Lot Size (JELS models with a focus on multiple retailers with their replenishment coordination.

  3. 75 FR 1119 - Agency Information Collection (Supplier Perception Survey) Activity Under OMB Review

    Science.gov (United States)

    2010-01-08

    ... (Supplier Perception Survey) Activity Under OMB Review AGENCY: Office of Acquisition, Logistics and...).'' SUPPLEMENTARY INFORMATION: Title: Department of Veterans Affairs Supplier Perception Survey. OMB Control Number..., and a person is not required to respond to a collection of information unless it displays a currently...

  4. Audit of EDF generation and transmission division suppliers

    International Nuclear Information System (INIS)

    Leconte, J.P.

    1993-01-01

    This paper presents the process for acceptance by EDF/production and transmission group of suppliers, industrial equipment manufacturers and providers of repair activities or services for the maintenance of nuclear plants. 1 tab

  5. Study of U235 neutron fission spectrum by the knowledge of cross sections average over that spectrum

    International Nuclear Information System (INIS)

    Suarez, P.M.

    1997-01-01

    A literature search of cross sections averaged over the fission neutron spectrum confirms inconsistencies between calculated and experimental values for high threshold reactions. Since, in this case, calculated averaged cross sections are systematically lower than measured values, it is concluded that the representations used to carry out these calculations underestimate the number of neutrons in the high energy region of the spectrum. A careful measurement of the averaged cross section for the 45 Sc(n,2n) 44g Sc and 45 Sc(n,2n) 44m Sc high threshold reactions had been performed in the RA-6 Neutron Activation Analysis Laboratory after carefully checking that the neutron flux at the core position where the samples were being irradiated was indeed an undisturbed fission spectrum. The experimental values are greater than those calculated with either, Watt type representations or the one based on the Madland and Nix model for the prompt fission spectrum. In many areas of nuclear engineering, like validation of nuclear data, reactor calculations, applied nuclear physics, shielding design, etc., it is of great practical importance to have a representation for the neutron flux that can be expressed in a closed analytical form and that agrees with experimental results, specially for the most widely fissile nuclide, 235 U. The results of the calculations mentioned above lead us to propose an analytical form for the 235 U fission neutron spectrum that better agrees with experimental results in the whole energy spectrum. We propose two different forms; both are a modification of the Watt-type form that has been adopted within the ENDF/B-V files. One of the new analytical representations is defined in two regions: below 9.5 MeV it is exactly the same formula as that used within the ENDF/B-V files, above this energy the parameters of this formula are changed. The other proposed analytical representation is expressed by a single formula in the whole energy range. These two new

  6. Evaluation and selection of sustainable suppliers in supply chain using new GP-DEA model with imprecise data

    Science.gov (United States)

    Jafarzadeh Ghoushchi, Saeid; Dodkanloi Milan, Mehran; Jahangoshai Rezaee, Mustafa

    2017-11-01

    Nowadays, with respect to knowledge growth about enterprise sustainability, sustainable supplier selection is considered a vital factor in sustainable supply chain management. On the other hand, usually in real problems, the data are imprecise. One method that is helpful for the evaluation and selection of the sustainable supplier and has the ability to use a variety of data types is data envelopment analysis (DEA). In the present article, first, the supplier efficiency is measured with respect to all economic, social and environmental dimensions using DEA and applying imprecise data. Then, to have a general evaluation of the suppliers, the DEA model is developed using imprecise data based on goal programming (GP). Integrating the set of criteria changes the new model into a coherent framework for sustainable supplier selection. Moreover, employing this model in a multilateral sustainable supplier selection can be an incentive for the suppliers to move towards environmental, social and economic activities. Improving environmental, economic and social performance will mean improving the supply chain performance. Finally, the application of the proposed approach is presented with a real dataset.

  7. A review of methods supporting supplier selection

    NARCIS (Netherlands)

    de Boer, L.; Labro, Eva; Morlacchi, Pierangela

    2001-01-01

    this paper we present a review of decision methods reported in the literature for supporting the supplier selection process. The review is based on an extensive search in the academic literature. We position the contributions in a framework that takes the diversity of procurement situations in terms

  8. Watt-level wireless power transmission to multiple compact receivers

    International Nuclear Information System (INIS)

    Garraud, A; Munzer, D J; Althar, M; Garraud, N; Arnold, D P

    2015-01-01

    This paper reports an electrodynamic wireless power transmission (EWPT) system using a low-frequency (300 Hz) magnetic field to transmit watt-scale power levels to multiple compact receivers. As compared to inductively or resonantly coupled coils, EWPT facilitates transmission to multiple non-interacting receivers with little restriction on their orientation. A single 3.0 cm 3 receiver achieves 1.25 W power transmission with 8% efficiency at a distance of 1 cm (350 mW/cm 3 power density) from the transmitter. The same prototype achieves 9 mW at a distance of 9 cm. Moreover, we demonstrate simultaneous recharge of two wearable devices, using two receivers located in arbitrary positions and orientations. (paper)

  9. Parametric instability in the Watt governor with periodic loading

    International Nuclear Information System (INIS)

    Bhattacharjee, Shayak; Kumar, Krishna

    2014-01-01

    In this work we examine a potential source of instability in the Watt governor, which can occur when the governor is subjected to periodic variation of the load torque. Floquet analysis is used to obtain the condition for existence of the unstable solutions, and results are obtained which supplement the usual Maxwell–Vyshnegradskii conditions for governor stability. Pedagogically, this paper is relevant for senior undergraduate students. It presents a detailed yet simple exposition of classical Floquet theory, a subject often ignored in undergraduate education even though the related concept of Bloch's theorem is popular in quantum mechanics courses. At the same time, it touches on certain practical engineering applications of physical concepts, with its discussion on mechanical governors. (paper)

  10. Competing of Sznajd and voter dynamics in the Watts-Strogatz network

    OpenAIRE

    Rybak, Marcin; Kulakowski, Krzysztof

    2013-01-01

    We investigate the Watts-Strogatz network with the clustering coefficient C dependent on the rewiring probability. The network is an area of two opposite contact processes, where nodes can be in two states, S or D. One of the processes is governed by the Sznajd dynamics: if there are two connected nodes in D-state, all their neighbors become D with probability p. For the opposite process it is sufficient to have only one neighbor in state S; this transition occurs with probability 1. The conc...

  11. A robust optimisation approach to the problem of supplier selection and allocation in outsourcing

    Science.gov (United States)

    Fu, Yelin; Keung Lai, Kin; Liang, Liang

    2016-03-01

    We formulate the supplier selection and allocation problem in outsourcing under an uncertain environment as a stochastic programming problem. Both the decision-maker's attitude towards risk and the penalty parameters for demand deviation are considered in the objective function. A service level agreement, upper bound for each selected supplier's allocation and the number of selected suppliers are considered as constraints. A novel robust optimisation approach is employed to solve this problem under different economic situations. Illustrative examples are presented with managerial implications highlighted to support decision-making.

  12. Liability of German suppliers and service providers for foreign projects

    International Nuclear Information System (INIS)

    Raetzke, Christian

    2017-01-01

    Main topic is the question of the extent to which German plant constructors, suppliers, engineering consultants, experts or operators expose themselves to liability for the delivery of their products and services abroad. In principle, in almost all nuclear power countries, liability is channelled to the operator; suppliers and service providers are exempted from liability. However, there are conceivable cases in which this principle does not apply. This can occur, for example, if a major accident is assumed to have an impact on neighbouring countries of the country of destination; here, depending on the applicable law, the German supplier or service provider could be ordered to pay for damages. The risk of liability remaining in this way can be reduced if necessary by means of an exemption clause in the supply contract. The regulation of the operator's recourse to the contractor, insofar as the latter is responsible for the accident, and the - controversial -question of to what extent damage to the plant itself gives rise to claims for damages by the operator against the contractor are also discussed.

  13. Green Supplier Evaluation by Using an Integrated Fuzzy AHP- VIKOR Approach

    Directory of Open Access Journals (Sweden)

    Mehdi HakimiAsl

    2016-08-01

    Full Text Available In the previous decade, fossil energy resources shortage and environmental challenges such as air and water pollution, global warming, and greenhouse-gas emissions, etc. have increased environmental concerns considerably. Since, one of the most practical and useful solutions to decrease environmental pollutants is to deploy green purchasing and clean energies by organizations or even governments. Thus, the construction of renewable-energy power plants and, consequently, the green supplier selection for these plants’ equipment has become more important. With this respect, this article presents a novel approach to assess and select green suppliers of a solar power plant. The proposed approach integrates Fuzzy Analytic Hierarchy Process and VIKOR (Vise Kriterijumska Optimizacija I Kompromisno Resenje methodologies. The results demonstrate the efficiency of the proposed approach as a practical tool to assist managers and CEOs (Chief Executive Officers of electric power industry in assessing suppliers of solar power plant’s equipment.

  14. Qualification Requirements for Foreign Suppliers in Public Procurement – Evidence from the Czech Republic

    Directory of Open Access Journals (Sweden)

    Vyklický Martin

    2016-03-01

    Full Text Available Qualification requirements for foreign suppliers in Public Procurement (PP are quite different in each European Union (EU member state. The most complex requirements for foreign suppliers in the context of public purchases are included in the Czech PP law. The aim of this paper is to make an overview of the problem of qualification requirements for foreign suppliers in the PP law of the CR. Its sub-objectives are the identification and explanation of solutions to the problem in the PP legislation of neighboring countries of the CR that are also members of the EU. The methodological part of the contribution is based mainly on the analysis and critical evaluation of the current state of legal issues relating to the proof of qualification of foreign suppliers in PP orders of the CR; with examples of fairly extensive decision-making practices of the Office for the Protection of Competition and law courts, including the jurisprudence of the European Court of Justice. The paper highlights the unnecessary complexity of qualification requirements that, on purely formal grounds, inhibits submissions of tenders from potential foreign suppliers that would otherwise be able to submit a bid for a public contract without any problems whatsoever. The authors are using and applying a comparative-legal method in the context of the comparison of the PP legislation of neighboring countries of the CR that are also members of the EU. The case study of foreign suppliers bidding for above-threshold public tenders in the CR at the minimum legal requirements of the contracting authority (CA for proof of qualification, the comparation study with selected EU countries or analysis of the development of the proportion of public contracts awarded to foreign suppliers in 2010–2014 shows that there is legislation uncertainty in EU PP law that should be reduced and simplified on an EC basis.

  15. A Fuzzy MCDM Approach for Green Supplier Selection from the Economic and Environmental Aspects

    Directory of Open Access Journals (Sweden)

    Hsiu Mei Wang Chen

    2016-01-01

    Full Text Available Due to the challenge of rising public awareness of environmental issues and governmental regulations, green supply chain management (SCM has become an important issue for companies to gain environmental sustainability. Supplier selection is one of the key operational tasks necessary to construct a green SCM. To select the most suitable suppliers, many economic and environmental criteria must be considered in the decision process. Although numerous studies have used economic criteria such as cost, quality, and lead time in the supplier selection process, only some studies have taken into account the environmental issues. This study proposes a comprehensive fuzzy multicriteria decision making (MCDM approach for green supplier selection and evaluation, using both economic and environmental criteria. In the proposed approach, a fuzzy analytic hierarchy process (AHP is employed to determine the important weights of criteria under vague environment. In addition, a fuzzy technique for order performance by similarity to ideal solution (TOPSIS is used to evaluate and rank the potential suppliers. Finally, a case study in Luminance Enhancement Film (LEF industry is presented to illustrate the applicability and efficiency of the proposed method.

  16. A Study of How the Watts-Strogatz Model Relates to an Economic System’s Utility

    Directory of Open Access Journals (Sweden)

    Lunhan Luo

    2014-01-01

    Full Text Available Watts-Strogatz model is a main mechanism to construct the small-world networks. It is widely used in the simulations of small-world featured systems including economic system. Formally, the model contains a parameters set including three variables representing group size, number of neighbors, and rewiring probability. This paper discusses how the parameters set relates to the economic system performance which is utility growth rate. In conclusion, it is found that, regardless of the group size and rewiring probability, 2 to 18 neighbors can help the economic system reach the highest utility growth rate. Furthermore, given the range of neighbors and group size of a Watts-Strogatz model based system, the range of its edges can be calculated too. By examining the containment relationship between that range and the edge number of an actual equal-size economic system, we could know whether the system structure has redundant edges or can achieve the highest utility growth ratio.

  17. Research on the Risk Early Warning Method of Material Supplier Performance in Power Industry

    Science.gov (United States)

    Chen, Peng; Zhang, Xi

    2018-01-01

    The early warning of supplier performance risk is still in the initial stage interiorly, and research on the early warning mechanism to identify, analyze and prevent the performance risk is few. In this paper, a new method aiming at marerial supplier performance risk in power industry is proposed, firstly, establishing a set of risk early warning indexes, Then use the ECM method to classify the indexes to form different risk grades. Then, improving Crock Ford risk quantization model by considering three indicators, including the stability of power system, economic losses and successful bid ratio to form the predictive risk grade, and ultimately using short board effect principle to form the ultimate risk grade to truly reflect the supplier performance risk. Finally, making empirical analysis on supplier performance and putting forward the counter measures and prevention strategies for different risks.

  18. Supplier Integration in Category Management : A case study of the situational impact on relationship performance and interdependence

    OpenAIRE

    Ellström, Daniel

    2015-01-01

    Supplier integration in category management means that a supplier takes part in the activities that are traditionally performed by retailers. These activities are the selection of which products to sell, decisions on how to price and market the products, and making sure that the products are delivered to the stores in a timely manner. Depending on the situation, an integration of suppliers in these activities can be more or less suitable. As more research is needed to understand when supplier...

  19. Supplier's sales engineer as a knowledge worker

    NARCIS (Netherlands)

    Kopecka, J.A.; Santema, S.C.; Hultink, H.J.

    2012-01-01

    The paper forms part of a multiple case study in progress that focuses on information relationships, i.e., the exchange of information and knowledge at the micro-social level between supplier and buyer firms in the fuzzy front end of product development. The micro-social level is made up of dyadic

  20. Designing a Decision Support System (DSS for Supplier Selection in Multiple Discount Environment

    Directory of Open Access Journals (Sweden)

    Marzieh Shahrezaee

    2012-09-01

    Full Text Available This research aims at developing original components of Decision Support System (DSS in order to support the evaluation and selection of suppliers in multi products having limited capacity. To achieve this purpose, researchers have proposed three different models based on which suppliers allow selecting their own desired type of discount. Firstly based on the performed studies, some criteria have been suggested for evaluating the suppliers’ capability. These criteria will be selected by the buyer with respect to the purchase condition and type of the industry, and their importance level will be determined. Then based on multi-criteria decision models, evaluation of all the suppliers will be done. In this study fuzzy numbers are applied so as to translate qualitative criteria into quantitative one. Suppliers have been ranked according to the scores they have gained and the selection share of each from the whole quantity has been determined based on the multi-objective mathematical model. The existing model has exerted practical ways such as taking loans with determined interest as well as certain variables in order to compensate the shortage of budget the buyer encounters with. Outputs, which are, the selective suppliers and orders assigned to each of them are also to be considered by using Genetic Algorithm in MATLAB software for three parts in Emersan Company accordingly.

  1. A Hybrid Neutrosophic Group ANP-TOPSIS Framework for Supplier Selection Problems

    Directory of Open Access Journals (Sweden)

    Mohamed Abdel-Basset

    2018-06-01

    Full Text Available One of the most significant competitive strategies for organizations is sustainable supply chain management (SSCM. The vital part in the administration of a sustainable supply chain is the sustainable supplier selection, which is a multi-criteria decision-making issue, including many conflicting criteria. The valuation and selection of sustainable suppliers are difficult problems due to vague, inconsistent and imprecise knowledge of decision makers. In the literature on supply chain management for measuring green performance, the requirement for methodological analysis of how sustainable variables affect each other, and how to consider vague, imprecise and inconsistent knowledge, is still unresolved. This research provides an incorporated multi-criteria decision-making procedure for sustainable supplier selection problems (SSSPs. An integrated framework is presented via interval-valued neutrosophic sets to deal with vague, imprecise and inconsistent information that exists usually in real world. The analytic network process (ANP is employed to calculate weights of selected criteria by considering their interdependencies. For ranking alternatives and avoiding additional comparisons of analytic network processes, the technique for order preference by similarity to ideal solution (TOPSIS is used. The proposed framework is turned to account for analyzing and selecting the optimal supplier. An actual case study of a dairy company in Egypt is examined within the proposed framework. Comparison with other existing methods is implemented to confirm the effectiveness and efficiency of the proposed approach.

  2. An analysis of buyer-supplier collaboration in the South African textile industry

    Directory of Open Access Journals (Sweden)

    H. Parker

    2007-12-01

    Full Text Available Purpose: The purpose of this article is to explore perceptions regarding buyer and supplier collaboration around product development. The aim is to gain an understanding of which factors influence buyer-supplier collaboration outcomes in the South African textile industry. Methodology: This study comprised two data collection stages. The first stage comprised the design and administration of a questionnaire survey. The second stage utilised a qualitative interview methodology and entailed interviewing a subset of the questionnaire respondents in order to probe respondents’ own experiences in collaborative product developments and their perception of the factors that determine collaboration outcome. Findings: This study has shed light on the experiences of South African firms in the textile industry engaging in buyer-supplier collaboration around product development. While this study is exploratory, it has provided evidence that there are certain factors which are perceived to have a significant influence on collaboration. Implications: Under the past protective shield of tariffs, South African clothing and textile manufacturers could afford to allow an adversarial mode of operation to perpetuate inefficiencies. However, the increasing external pressures, including the very real threat of overseas competition, heighten the need for collaboration between buyers and suppliers. This relates, in particular, to collaboration aimed at new product development, which can be seen as a new imperative for the survival and growth of this industry. Currently, there are numerous barriers to effective collaboration. The overwhelming power of retailers in the value chain is one such barrier, as it creates an environment which is pressurised, strained and not conducive to buyer-supplier collaboration. Contribution and Value: Studies on collaborative new product development have primarily been done in developed countries, with a focus on technology intensive

  3. Electrodes from carbon nanotubes/NiO nanocomposites synthesized in modified Watts bath for supercapacitors

    Science.gov (United States)

    Hakamada, Masataka; Abe, Tatsuhiko; Mabuchi, Mamoru

    2016-09-01

    A modified Watts bath coupled with pulsed current electroplating is used to uniformly deposit ultrafine nickel oxide particles (diameter < 4 nm) on multiwalled carbon nanotubes. The capacitance of the multiwalled carbon nanotubes/nickel oxide electrodes was as high as 2480 F g-1 (per mass of nickel oxide), which is close to the theoretical capacitance of NiO.

  4. Hospitals may be bound by terms added in supplier's acceptance of an offer.

    Science.gov (United States)

    Decker, R

    1992-03-01

    A hospital materials manager reports that a supplier is attempting to hold the hospital to new terms that the supplier added in the acceptance of an offer to buy. The offer to buy was made in the hospital's purchase order. In this dialogue, Dr. Decker develops the law relating to such a transaction.

  5. Managing Innovation in A Supplier Dominated Firm: Considering The Way Forward

    OpenAIRE

    Poulsom, Nigel

    2007-01-01

    One of the most important things to bear in mind when considering innovation is that innovation is essentially change. How that change is managed will determine how innovative a firm actually is and the ability to manage innovation successfully will hopefully lead to a competitive advantage.\\ud \\ud Sri Jentayu Global are undeniably a supplier dominated firm and do to some degree depend upon their suppliers. However, they are not as dependent as one might imagine or indeed as the theory may su...

  6. Analisis Dan Rekayasa Supplier Relationship Management System Pada CV. Softcom Medan

    OpenAIRE

    Sukiman

    2012-01-01

    CV. SOFTCOM is a business entity engages in the computer sales and repair services. At the beginning of its establishment, the company did not see the importance of specialized brand in selling its product. The background of this study was the phenomenon in which many suppliers and different brands of the products found in the market that the company found it difficult to serve its customers claiming the damage of the sold products, the time of product delivered by the suppliers was frequentl...

  7. The effect of safeguards on the contractual relations of nuclear suppliers

    International Nuclear Information System (INIS)

    MacIsaac, J.F.D.

    1976-01-01

    Canada applies a safeguards system aimed to ensure that nuclear materials and equipment are not diverted from their peaceful uses. These control requirements have a direct influence on the conditions of export contracts concluded by Canadian suppliers of nuclear materials or equipment. In particular if the buyer does not comply with the safeguards clauses, it may not be possible for the Canadian supplier to fulfill the contract. This possibility is covered by the force majeure clauses. (N.E.A.) [fr

  8. Narrow linewidth picosecond UV pulsed laser with mega-watt peak power.

    Science.gov (United States)

    Huang, Chunning; Deibele, Craig; Liu, Yun

    2013-04-08

    We demonstrate a master oscillator power amplifier (MOPA) burst mode laser system that generates 66 ps/402.5 MHz pulses with mega-watt peak power at 355 nm. The seed laser consists of a single frequency fiber laser (linewidth laser is operating in a 5-μs/10-Hz macropulse mode. The laser output has a transform-limited spectrum with a very narrow linewidth of individual longitudinal modes. The immediate application of the laser system is the laser-assisted hydrogen ion beam stripping for the Spallation Neutron Source (SNS).

  9. World: 2508 nuclear tera-watts hour in 1999

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    In 1999, the nuclear power plants have produced 2508 tera-watts hour, that is to say 16% of the normal electricity production or 35% of the European electric production. At the end of 1999, 443 reactors were in operation, 53 were in building and 13 put in an order in the world. 5 reactors have been coupled to the network in South Korea, in France, in India, in Slovakia and 2 have been definitively stopped (Kazakhstan and Sweden). 1999 has seen the beginning of construction for 8 reactors (China, South Korea, Japan and Taiwan). The nuclear power has covered 40 % of needs for 8 countries: France (75%), Lithuania (73%) Belgium (58%), Sweden (46%), Slovakia (45%), Ukraine (43.5%), South Korea ( 43%), Bulgaria ( 41.5%). 18 countries have used nuclear energy to cover at least 25% of their needs. (N.C.)

  10. Assessing buyer-supplier relationship management: a multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.; Buter, J.I.H.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  11. Creating value in supply chains : suppliers' impact on value for customers, society and shareholders

    NARCIS (Netherlands)

    Kibbeling, M.I.

    2010-01-01

    This dissertation deals with the question how suppliers contribute to creating value in supply chains. The last decades have been characterized by increased specialization of business activities and, consequently, firms have outsourced between 50% and 80% of their business activities to suppliers.

  12. Assessing buyer-supplier relationship management : A multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, J.; Voordijk, H.; Vos, G.C.J.M.; Buter, J.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  13. 78 FR 59701 - Medicare Program; Approval of Accrediting Organization for Suppliers of Advanced Diagnostic...

    Science.gov (United States)

    2013-09-27

    ...] Medicare Program; Approval of Accrediting Organization for Suppliers of Advanced Diagnostic Imaging... accredit suppliers seeking to furnish the technical component (TC) of advanced diagnostic imaging services... advanced diagnostic imaging (ADI) service and establish procedures to ensure that the criteria used by an...

  14. A supply chain perspective on the supplier relationship practices of travel agencies in Gauteng

    Directory of Open Access Journals (Sweden)

    Mornay Roberts-Lombard

    2009-11-01

    Full Text Available The purpose of the paper is to explore the supplier relationship practices of travel agencies in Gauteng. Gerber (2008 indicated that the current level of relationships that exists between travel agencies and their suppliers in Gauteng are fragmented and impact negatively on the ability of travel agents to deliver a quality service to their customers. It is against this background that the research was undertaken. The target population for this study was 228 travel agencies of which 134 managers and/or owners participated through personal interviews in the completion of questionnaires. The results indicate that the owners and managers of travel agencies are of the opinion that the level of trust between themselves and their suppliers needs to be strengthened. The stimulation of open channel communication between themselves and their suppliers could enhance the strengthening of a long-term relationship between the parties.

  15. Proposing a New Approach for Supplier Selection Based on Kraljic’s Model Using FMEA and Integer Linear Programming

    Directory of Open Access Journals (Sweden)

    S. Mohammad Arabzad

    2012-06-01

    Full Text Available In recent years, numerous methods have been proposed to deal with supplier evaluation and selection problem, but a point which has been usually neglected by researchers is the role of purchasing items. The aim of this paper is to propose an integrated approach to select suppliers and allocate orders on the basis of the nature of the purchasing items which means that this issue plays an important role in supplier selection and order allocation. Therefore, items are first categorized according to the Kraljic’s model by the use of FMEA technique. Then, suppliers are categorized and evaluated in four phases with respect to different types of purchasing items (Strategic, Bottleneck, Leverage and Routine. Finally, an integer linear programming is utilized to allocate purchasing orders to suppliers. Furthermore, an empirical example is conducted to illustrate the stage of proposed approach. Results imply that ranking of suppliers and allocation of purchasing items based on the nature of purchasing items will create more capabilities in managing purchasing items and suppliers .

  16. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  17. Analysis of carbon monoxide production in multihundred-watt heat sources

    International Nuclear Information System (INIS)

    Peterson, D.E.; Mulford, R.N.R.

    1976-05-01

    The production of carbon monoxide observed within Multihundred Watt heat sources placed under storage conditions was analyzed. Results of compositional and isotopic analyses of gas taps performed on eight heat sources are summarized and interpreted. Several proposed CO generation mechanisms are examined theoretically and assessed by applying thermodynamic principles. Outgassing of the heat source graphite followed by oxygen isotopic exchange through the vent assemblies appears to explain the CO production at storage temperatures. Reduction of the plutonia fuel sphere by the CO is examined as a function of temperature and stoichiometry. Experiments that could be performed to investigate possible CO generation mechanisms are discussed

  18. Characterization of flexure hinges for the French watt balance experiment

    Directory of Open Access Journals (Sweden)

    Pinot Patrick

    2014-01-01

    Full Text Available In the French watt balance experiment, the translation and rotation functions must have no backlash, no friction, nor the need for lubricants. In addition errors in position and movement must be below 100 nm. Flexure hinges can meet all of these criteria. Different materials, profile shapes and machining techniques have been studied. The flexure pivots have been characterized using three techniques: 1 an optical microscope and, if necessary, a SEM to observe the surface inhomogeneities; 2 a mass comparator to determine the bending stiffness of unloaded pivots; 3 a loaded beam oscillating freely under vacuum to study the dynamic behavior of loaded pivots.

  19. Results of metallographical diagnostic examination of Navy half-watt thermoelectric converters degraded by accelerated tests

    International Nuclear Information System (INIS)

    Rosell, F.E. Jr.; Rouklove, P.G.

    1977-01-01

    To verify the 15-year reliability of the Navy half-watt radioisotope thermoelectric generator (RTG), bismuth--telluride thermoelectric converters were submitted to testing at high temperatures which accelerated the degradation and caused failure of the converters. Metallographic diagnostic examination of failed units verified failure mechanisms. Results of diagnostic examinations are presented

  20. Performance-based supplier audits - a quality and technical partnership

    International Nuclear Information System (INIS)

    Martin, E.L.

    1993-01-01

    The nuclear utility industry will realize the necessity and advantages of integrating engineering and quality assurance efforts into a unified, balanced approach to overview the activities of their suppliers (manufacturers)

  1. Pressure or Pamper? The Effects of Power and Trust Dimensions on Supplier Resource Allocation

    NARCIS (Netherlands)

    Pulles, Niels Jaring; Veldman, Jasper; Schiele, Holger; Sierksma, Henk

    2014-01-01

    Leveraging the supply chain for competitive resources remains a key challenge for supply chain management. Drawing on social exchange theory, this study examines SCM practices that help firms to acquire better supplier resources than rival firms that source from the same supplier. We provide a

  2. High Average Power, High Energy Short Pulse Fiber Laser System

    Energy Technology Data Exchange (ETDEWEB)

    Messerly, M J

    2007-11-13

    Recently continuous wave fiber laser systems with output powers in excess of 500W with good beam quality have been demonstrated [1]. High energy, ultrafast, chirped pulsed fiber laser systems have achieved record output energies of 1mJ [2]. However, these high-energy systems have not been scaled beyond a few watts of average output power. Fiber laser systems are attractive for many applications because they offer the promise of high efficiency, compact, robust systems that are turn key. Applications such as cutting, drilling and materials processing, front end systems for high energy pulsed lasers (such as petawatts) and laser based sources of high spatial coherence, high flux x-rays all require high energy short pulses and two of the three of these applications also require high average power. The challenge in creating a high energy chirped pulse fiber laser system is to find a way to scale the output energy while avoiding nonlinear effects and maintaining good beam quality in the amplifier fiber. To this end, our 3-year LDRD program sought to demonstrate a high energy, high average power fiber laser system. This work included exploring designs of large mode area optical fiber amplifiers for high energy systems as well as understanding the issues associated chirped pulse amplification in optical fiber amplifier systems.

  3. Company maturity models: Application to supplier development program in oil&gas sector

    Directory of Open Access Journals (Sweden)

    Jabier Retegi Albisua

    2018-04-01

    Full Text Available Purpose: In order to achieve excellence, outsourced maintenance contractors in Oil&Gas sector play a key role due to the important impact of their task on security, availability and energy consumption. This paper presents the process followed in order to implement a Supplier Development Program in a refinery using Company Maturity Model (CoMM and the results obtained in three cases validating the method to obtain a strategic improvement project medium term grid. Design/methodology/approach: The methodology followed consists of constructing a CoMM capturing the knowledge existing in the refinery and applying it with three supplier improvement teams. Findings and conclusions have arised through an observation of the three processes and extracting common conclusions. Findings: The resulting CoMM has been used for self-assessment by three suppliers and has demonstrated its potential to define a medium-term improvement project road map validated by the customer. Furthermore, during the design and application processes, the contribution of CoMMs to the SECI process of knowledge management has been observed. Practical implications: The use of CoMMs in a service contractor context can be applied in other sectors. It contributes to alignment of targets between the supplier and customer companies and to knowledge sharing inside both firms. Originality/value: Maturity models in many transversal fields (CMMI, EFQM, BPMM, PEMM, etc. have been thoroughly studied in the literature. Less effort has been made analysing the case of using maturity models constructed and implemented by a company for its specific purposes. In this paper, the process followed by a company to establish a Supplier Development Process using CoMMs is described.

  4. Selection the Optimum Suppliers Compound Using a Mixed Model of MADM and Fault Tree Analysis

    Directory of Open Access Journals (Sweden)

    Meysam Azimian

    2017-03-01

    Full Text Available In this paper, an integrated approach of MADM and fault tree analysis (FTA is provided for determining the most reliable combination of suppliers for a strategic product in IUT University. At first, risks of suppliers is estimated by defining the indices for evaluating them, determining their relative status indices and using satisfying and SAW methods. Then, intrinsic risks of utilized equipments in the products are qualified and the final integrated risk for equipments is determined. Finally, through all the different scenarios, the best composition of equipment suppliers is selected by defining the palpable top events and fault tree analysis. The contribution of this paper is about proposing an integrated method of MADM and FTA to determine the most reliable suppliers in order to minimize the final risk of providing a product.

  5. Water Service Areas - Public Water Supplier's (PWS) Service Areas

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Boundaries of current public water supplier's (PWS) service areas. This data set contains the present service area boundary of the water system and does not contain...

  6. Random walk in degree space and the time-dependent Watts-Strogatz model

    OpenAIRE

    Grande, H. L. Casa; Cotacallapa, M.; Hase, M. O.

    2016-01-01

    In this work, we propose a scheme that provides an analytical estimate for the time-dependent degree distribution of some networks. This scheme maps the problem into a random walk in degree space, and then we choose the paths that are responsible for the dominant contributions. The method is illustrated on the dynamical versions of the Erd\\"os-R\\'enyi and Watts-Strogatz graphs, which were introduced as static models in the original formulation. We have succeeded in obtaining an analytical for...

  7. Supplier Short Term Load Forecasting Using Support Vector Regression and Exogenous Input

    Science.gov (United States)

    Matijaš, Marin; Vukićcević, Milan; Krajcar, Slavko

    2011-09-01

    In power systems, task of load forecasting is important for keeping equilibrium between production and consumption. With liberalization of electricity markets, task of load forecasting changed because each market participant has to forecast their own load. Consumption of end-consumers is stochastic in nature. Due to competition, suppliers are not in a position to transfer their costs to end-consumers; therefore it is essential to keep forecasting error as low as possible. Numerous papers are investigating load forecasting from the perspective of the grid or production planning. We research forecasting models from the perspective of a supplier. In this paper, we investigate different combinations of exogenous input on the simulated supplier loads and show that using points of delivery as a feature for Support Vector Regression leads to lower forecasting error, while adding customer number in different datasets does the opposite.

  8. Coordinating a Supply Chain When Manufacturer Makes Cost Reduction Investment in Supplier

    Directory of Open Access Journals (Sweden)

    Shilei Huang

    2016-01-01

    Full Text Available We consider a supply chain consisting of an upstream supplier and a downstream manufacturer, in which the supplier provides a component to the manufacturer, facing a price-sensitive and uncertain demand. The manufacturer makes cost reduction investment in the supplier to improve the supplier’s production efficiency, which benefits the entire supply chain. We derive the optimal investment and operating decisions. Both the centralized and decentralized supply chains are studied. We show that the optimal investment and operating decisions in the decentralized setting may deviate from that in the centralized setting. To avoid the profit loss caused by such a deviation, we develop a coordination mechanism by introducing a combined policy of revenue-sharing policy and investment cost-sharing policy. We also show that the developed coordination mechanism can achieve Pareto improvement for the two players.

  9. Automating radiochemistry: Considerations for commerical suppliers of devices

    International Nuclear Information System (INIS)

    Schmidt, D.G.

    1993-01-01

    The fundamental decision to automate a particular radiochemical synthesis for in house use depends primarily on the demand for the compound and the total number of studies to be carried out with that compound. For a commercial supplier of automated chemistry systems, much more goes in to the decision to design, develop and produce a particular automated chemistry system. There is a dramatic difference in design effort between an industrial environment and an academic environment. An in house system must be built only once and needs only to incrementally simplify the synthesis process. A commercial product must: have reasonable manufacturing costs; be easy to use; be aesthetically pleasing; be easy to install and service; be functionally integral with other equipment sold by the manufacturer; be marketable within the regulatory environment; address radiation safety issues. This paper discusses issues that guide commercial suppliers in the formation of their product lines

  10. Guidelines for performance-based supplier audits (NCIG-16)

    International Nuclear Information System (INIS)

    Lauderdale, J.R.; Mattu, R.K.; Roman, W.S.

    1990-06-01

    This document provides guidelines for planning and conducting performance-based audits of suppliers of items used in nuclear power plants. A common purpose of audits is to provide a basis for confidence in the supplier's controls to ensure that products received will perform their intended functions satisfactorily. Performance-based audits offer means of raising the level of confidence. This confidence comes from evaluation of important features of the product and the processes and activities that produce it. This document does not add requirements to those in existing codes, standards, or regulations. The guidance herein is intended to complement the information in existing industry standards and practices. Performance-based audits are one element of an effective procurement program. A companion EPRI/NCIG document, EPRI NP-6629, Guidelines for the Procurement and Receipt of Items for Nuclear Power Plants (NCIG-15), provides guidance for other elements of an effective procurement program

  11. Utilization integrated Fuzzy-QFD and TOPSIS approach in supplier selection

    Directory of Open Access Journals (Sweden)

    2016-02-01

    Full Text Available Supplier selection is a typical multi-attribute problem that involves both qualitative and quantitative factors. To deal with this problem, different techniques have suggested. Being based on purely mathematical data, these techniques have significant drawbacks especially when we want to consider qualitative factors, which are very important in supplier selection and are not easy to measure. Some innovative approaches, based on artificial intelligence techniques such as Fuzzy Logic match very well with decision-making situations especially when decision makers express heterogeneous judgments. In this research, by the combination of Fuzzy logic and the House of Quality (HOQ, qualitative criteria are considered in the forward parts of car suppliers’ selection process in Sazehgostar SAIPA Company. Then, TOPSIS technique is adopted to consider quantitative metrics. Finally, by combining of Fuzzy QFD and TOPSIS techniques, these suppliers will be selected and ranked in this Company. Concern to the both qualitative and quantitative criteria, is the important point used in this research and also methodology utilized, counts innovative aspect. Limited number of experts associated with each piece and unavailability of some quantitative criteria has been limitations across of this study’s accomplishment.

  12. COLLABORATION BETWEEN SMALL RETAIL STORES AND SUPPLIERS OF FOOD PRODUCTS

    Directory of Open Access Journals (Sweden)

    Lenka Branska

    2017-01-01

    Full Text Available Small grocery stores are forced to look for ways to retain customers. One possibility is through collaboration with suppliers. Therefore, the aim of this research was to determine the forms of collaboration between small Czech grocery stores and suppliers and to specify the differences in this collaboration depending on store location and the possible affiliation of the store with a retail chain. To achieve this goal, quantitative research was carried out among 65 Czech retail stores using face-to-face interviews with predetermined questions. Collaboration was assessed on the basis of four criteria defined by the authors. It was found that the most frequently occurring element of collaboration was the provision of trade credit to retailers – less often, long-term contracts and synchronization of replenishment. The least used was information sharing. The research results show that the form of collaboration is significantly affected by customer value. Therefore, the level of collaboration can be improved by building horizontally interconnected retail chains. The paper enriches theoretical knowledge by specifying possible elements of collaboration between small retail stores and suppliers and mapping the frequency of their implementation.

  13. EVALUATION THE SUPPLIERS USING ANALYTIC HIERARCHY PROCESS(AHP: AN APPLICATION IN THE TEXTILE FIRM

    Directory of Open Access Journals (Sweden)

    AHMET ÖZTÜRK

    2013-06-01

    Full Text Available Supplier selection is a complex multi-criteria problem which includes both qualitative and quantitative criteria.  In order to select the suppliers, it is necessary to make a tradeoff between these criteria some of which may conflict. Different approaches are suggested to solve the supplier selection problem in the literature. Especially, Saaty’s analytic hierarchy process (AHS is more useful approach for the problem, because of its inherent capability to handle qualitative and quantitative criteria.The main purpose of this study is to solve the supplier selection problem of the textile firm by using AHS.  The proposed model consists of a hierarchical network of connections among five alternatives, seven main and thirteen sub criteria. Twenty-one pairwise comparison matrices were obtained by using focus group methodology.  The results are presented and the sensitivity analyses are performed. Finally, some suggestions and important clues for the management are presented.

  14. Non-integrated electricity suppliers: the failure of an organisational model

    International Nuclear Information System (INIS)

    Boroumand, R.H.

    2009-01-01

    In the reference model of market liberalization, the reference business model is the pure electricity retailer. But bankruptcy, merger or vertical integration are indicative of the failure of this organizational model and its incapacity to manage efficiently the combination of sourcing and market risks in a setting of fierce price competition. Because of the structural dimension of electricity's volume risk, a supplier's level of risk exposure is unknown ex ante and will only be revealed ex post when consumption is known. Sourcing and selling portfolios of hedging contracts are incomplete risk management tools. Consequently, physical hedging is an essential complement to portfolios of contracts to overcome the pure supplier's curse. (author)

  15. Eliminating the "I hate you" in the supplier-purchasing relationship.

    Science.gov (United States)

    Nelson, M

    1996-05-01

    Throughout time there has always been a supplier of some service or goods, and there has always been a purchaser of that service or goods. The one thing that has remained constant throughout that time is that they have an agreement not to like each other. This article will approach the subject in the "today" sense using current practical approaches that are used in all industries and will not deal with the relationships of the future. To cover this complex arena, the article will deal with four areas: (1) where we are now, (2) supplier-based concentration, (3) single sourcing, and (4) transportation techniques.

  16. Advanced supplier partnership practices: a case study.

    Science.gov (United States)

    Williams, B R

    2000-05-01

    This article describes how a supplier partnership was set up to avoid the typical purchasing relationship--price being inversely proportional to quantity and having the purchaser take all the risk of product obsolescence. The case study also describes how rate-based replenishment replaced time-based delivery, and how all these advantages were achieved at reduced administrative costs.

  17. Theoretical outline of supplier relationship management in conditions of economic uncertainty

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2012-12-01

    Full Text Available Internet facilities have created new ways to identify, negotiate and engage suppliers and partners worldwide. Adding value to organizations, supply chain management aims at streamlining all processes and communication channels between them and their main suppliers, to facilitate effective interactions and flawless. Critical conditions generated by the current crisis grew and deepened the importance of supply chain management concept and the leading organizations realized that business partners might be a key element for their success. Meanwhile, global exchange of information can improve business processes for better access to resources.

  18. The Role of the Technology Supplier in the Politics of Production

    DEFF Research Database (Denmark)

    Koch, Christian

    1996-01-01

    from a multitude of positions outside the factory. This includes the impacts through formation of subjectivity, labour market, social security, the origin of rawmateriel, ie.the production chains, and the technology used in the factory. On the basis of a Danish study the role of the technology supplier......This paper examines the relations between the technology supplier and the customer factory as an element of the politics of production. It is initially argued that labour process theory cannot limit itself to the analysis of individual enterprises. The politics in production is actually impacted...

  19. Customer attractiveness, supplier satisfaction and preferred customer status : a review and a cycle model

    NARCIS (Netherlands)

    Schiele, Holger; Veldman, Jasper; Hüttinger, L.

    2012-01-01

    In this paper, we introduce the concept of preferred customer status, i.e. a buyer is awarded preferential treatment of its important suppliers compared to their other customers. As there is a lack of knowledge of what motivates suppliers to serve selected buyers better than others, our research

  20. Supplier evaluation system of the wood processing enterprise in the region of the CZ, SK, HU and AT

    OpenAIRE

    Muselíková, Vladislava

    2015-01-01

    The Bachelor thesis Supplier evaluation system of the wood processing enterprise in the region of the CR, the SK, HU and AT deals with the analysis of the current supplier evaluation system in IKEA Industry company in Malacky. The theoretical part is based on literature review and contains a description of the purchasing process and methodology for selection and evaluation of suppliers. The practical part is devoted to the analysis of the Supplier Classification in IKEA. The main output of th...

  1. Managing Coopetition in Supplier Networks : A Paradox Perspective

    NARCIS (Netherlands)

    Wilhelm, Miriam; Sydow, Jörg

    2018-01-01

    Scholars in the field of supply chain management have started to embrace the idea of simultaneous cooperation and competition (“coopetition”) in supplier networks but have mainly looked at coopetition from a structural perspective. In this paper, we complement the structural view with a paradox

  2. An Integrated Model of Material Supplier Selection and Order Allocation Using Fuzzy Extended AHP and Multiobjective Programming

    Directory of Open Access Journals (Sweden)

    Zhi Li

    2013-01-01

    Full Text Available This paper presents a supplier selection and order allocation (SSOA model to solve the problem of a multiperiod supplier selection and then order allocation in the environment of short product life cycle and frequent material purchasing, for example, fast fashion environment in apparel industry. At the first stage, with consideration of multiple decision criteria and the fuzziness of the data involved in deciding the preferences of multiple decision variables in supplier selection, the fuzzy extent analytic hierarchy process (FEAHP is adopted. In the second stage, supplier ranks are inputted into an order allocation model that aims at minimizing the risk of material purchasing and minimizing the total material purchasing costs using a dynamic programming approach, subject to constraints on deterministic customer demand and deterministic supplier capacity. Numerical examples are presented, and computational results are reported.

  3. Normal boundary intersection method for suppliers' strategic bidding in electricity markets: An environmental/economic approach

    International Nuclear Information System (INIS)

    Vahidinasab, V.; Jadid, S.

    2010-01-01

    In this paper the problem of developing optimal bidding strategies for the participants of oligopolistic energy markets is studied. Special attention is given to the impacts of suppliers' emission of pollutants on their bidding strategies. The proposed methodology employs supply function equilibrium (SFE) model to represent the strategic behavior of each supplier and locational marginal pricing mechanism for the market clearing. The optimal bidding strategies are developed mathematically using a bilevel optimization problem where the upper-level subproblem maximizes individual supplier payoff and the lower-level subproblem solves the Independent System Operator's market clearing problem. In order to solve market clearing mechanism the multiobjective optimal power flow is used with supplier emission of pollutants, as an extra objective, subject to the supplier physical constraints. This paper uses normal boundary intersection (NBI) approach for generating Pareto optimal set and then fuzzy decision making to select the best compromise solution. The developed algorithm is applied to an IEEE 30-bus test system. Numerical results demonstrate the potential and effectiveness of the proposed multiobjective approach to develop successful bidding strategies in those energy markets that minimize generation cost and emission of pollutants simultaneously.

  4. Corporate Social Responsibility in Buyer-Supplier Relationships: Is it Beneficial for Top-Tier Suppliers to Market their Capability to Ensure a Responsible Supply Chain?

    Directory of Open Access Journals (Sweden)

    Thomas Leppelt

    2013-11-01

    Full Text Available This study assesses how top-tier suppliers market their capabilities to ensure a responsible upstream supply chain to their downstream buyers, and how the marketing of corporate social responsibility (CSR-related supply management practices affects the reputation of top-tier suppliers in business-to-business (B2B markets. In a cross-functional multiple-case study involving marketing, purchasing, and sustainability executives of five supplier organizations in Central Europe, we explored four distinct approaches for marketing superior CSR management abilities in B2B markets that potentially foster long-term comparative advantages: (1 Fact-based communication of measurable CSR capabilities, (2 targeting of indirect customers and influencers, (3 marketing through education, and (4 marketing of CSR as a service. Moreover, our inductive results provide evidence that the effective marketing of CSR capabilities enhances a supplier’s reputation only if it sends consistent signals to the market. Therefore, a close integration of marketing and purchasing is crucial for achieving signaling consistency. Building on an established framework of purchasing-marketing integration in the particular context of CSR we developed a crossfunctional theory on the link between marketing, supply chain alignment and reputation, which is expressed in four sets of testable research propositions.

  5. Watt-Level Continuous-Wave Emission from a Bi-Functional Quantum Cascade Laser/Detector

    Science.gov (United States)

    2017-04-18

    cally authorized by the U.S. Government may violate any copyrights that exist in this work. Watt-level continuous- wave emission from a bi- functional ... wave bi- functional devices, opens the perspective of on-chip dual comb spectroscopy. Also for discrete sens- ing setups, one can switch to lasers...seas.harvard.edu Abstract Bi- functional active regions, capable of light generation and detection at the same wavelength, allow a straightforward realization of

  6. 42 CFR 414.50 - Physician or other supplier billing for diagnostic tests performed or interpreted by a physician...

    Science.gov (United States)

    2010-10-01

    ... HEALTH SERVICES Physicians and Other Practitioners § 414.50 Physician or other supplier billing for... services through such billing physician or other supplier. The “substantially all” requirement will be satisfied if, at the time the billing physician or other supplier submits a claim for a service furnished by...

  7. Bridges over troubled water: suppliers as connective nodes in global supply networks

    DEFF Research Database (Denmark)

    Christensen, Poul Rind; Andersen, Poul Houman

    2005-01-01

    -oriented, focusing on the leading contractor's supply chain management. However, the increased demand for flexibility echoes down in supply network, decentralising the coordination task. We focus on subcontractors as connective nodes in supply networks and outline how coordinative roles are linked to the diversity......Increasingly, industrial selling and purchasing is embedded in supplier networks extending national borders. The internationalisation of supply activities adds considerable complexity to the coordination tasks performed by suppliers. Traditionally, supply chain management was upstream...

  8. Motives for e-marketplace participation: differences and similarities between buyers and suppliers

    DEFF Research Database (Denmark)

    Rask, Morten; Kragh, Hanne

    2004-01-01

    -marketplaces to find new or alternative suppliers. Similarly, even though demands from existing customers have spurred their initial decision to participate in e-marketplaces, many suppliers also use the marketplaces to search for new customers. When expressing their motives for engaging in e-marketplace activities......The motivation of suppliers as well as buyers for e-marketplace participation is closely linked to the perceived outcome of participation, not only in terms of the benefits of joining an e-marketplace, but also in terms of the possible consequences of not joining. The key issue, therefore, is why...... organizations decide to buy and/or sell goods or services in e-marketplaces. We develop a theoretical framework for the categorization of motivational factors, resulting in four different types of motives. We then apply the framework to a dataset consisting of 41 case studies covering 20 industries in 12...

  9. Buyer-supplier relationship management in the construction industry

    NARCIS (Netherlands)

    Bemelmans, Jeroen

    2012-01-01

    The aim of this PhD research is to gain insight into ways in which contractors could improve the management of, and the collaboration with, suppliers in order to increase their competitiveness. To achieve this aim, four research phases are conducted. Firstly, the current status of

  10. ATLAS Rewards Russian Supplier for Scintillating Tile Production

    CERN Multimedia

    2001-01-01

    At a ceremony held at CERN on 30 July, the ATLAS collaboration awarded Russian firm SIA Luch from Podolsk in the Moscow region an ATLAS Suppliers Award. This follows delivery by the company of the final batch of scintillating tiles for the collaboration's Tile Calorimeter some six months ahead of schedule.   Representatives of Russian firm Luch Podolsk received the ATLAS Suppliers Award in the collaboration's Tile Calorimeter instrumentation plant at CERN on 30 July. In front of one Tile Calorimeter module instrumented by scintillating tiles are (left to right) IHEP physicists Evgueni Startchenko and Andrei Karioukhine, Luch Podolsk representatives Igor Karetnikov and Yuri Zaitsev, Tile Calorimeter Project Leader Rupert Leitner, ATLAS spokesperson Peter Jenni, and CERN Tile Calorimeter group leader Ana Henriques-Correia. Scintillating tiles form the active part of the ATLAS hadronic Tile Calorimeter, which will measure the energy and direction of particles produced in LHC collisions. They are emb...

  11. Design of a 300-Watt Isolated Power Supply with Minimized Circuit Input-to-Output Parasitic Capacitance

    DEFF Research Database (Denmark)

    Nguyen-Duy, Khiem; Petersen, Lars Press; Knott, Arnold

    2014-01-01

    This paper presents the design of a 300-Watt isolated power supply for MOS gate driver circuit in medium and high voltage applications. The key feature of the developed power supply is having a very low circuit input-to-output parasitic capacitance, thus maximizing its noise immunity. This makes...

  12. ANALISA PEMILIHAN SUPPLIER RAMAH LINGKUNGAN DENGAN METODE ANALYTICAL NETWORK PROCESS (ANP PADA PT KIMIA FARMA PLANT SEMARANG

    Directory of Open Access Journals (Sweden)

    Nia Budi Puspitasari

    2016-02-01

    Full Text Available Indonesia bersama Thailand dan Filipina menguasai pasar industri farmasi Asia Tenggara sebesar 80% serta diperkirakan pasar industri farmasi hingga 2016 akan mencapai nilai 96,1 miliar USD. Dalam menghadapi hal tersebut diperlukan beberapa hal dimana pada saat ini isu mengenai lingkungan sangat menjadi tren masyarakat. Regulasi pemerintah kepada industri mengenai lingkungan dan peningkatan jumlah masyarakat yang beralih kepada green product membuat industri untuk mulai memasukkan aspek lingkungan ke dalam proses industrinya. Pemilihan pemasok merupakan masalah pengambilan keputusan penting agar mendapatkan pemasok yang dapat meningkatkan daya saing perusahaan. Kriteria pemilihan pemasok umumnya hanya didasarkan pada aspek cost, delivery, dan kualitas. Hal tersebut belum sesuai dengan isu lingkungan dan regulasi pemerintah saat ini. Pemilihan green supplier dilakukan pada PT Kimia Farma plant Semarang. Hal tersebut dilakukan karena PT Kimia Farma plant Semarang berkeinginan mengarahkan produk yang dihasilkan ke arah green product. Saat ini PT Kimia Farma plant Semarang mengalami penurunan produksi dalam 2 tahun terakhir dimana pada jangka 5 tahun, PT Kimia Farma melakukan pergantian supplier sebanyak 5 kali. Analisa pemilihan green supplier tersebut dilakukan menggunakan metode Analytichal Network Process (ANP karena ANP merupakan salah satu metode yang mampu merepresentasikan tingkat kepentingan berbagai pihak dengan mempertimbangkan saling keterkaitan antar kriteria dan sub kriteria yang ada. . Pada pemilihan green supplier kriteria kualitas memiliki bobot 0,369, kriteria lingkungan memiliki bobot sebesar 0,246, kriteria harga memiliki bobot 0,159, kriteria pengiriman 0,11 kriteria pelayanan 0,072, dan kriteria hubungan pemasok 0,044. Rekomendasi supplier yang diberikan adalah PT Sejong karena memiliki bobot terbesar yaitu 0,271.     Abstract Indonesia with Thailand and Philippines now lead pharmaceutical industry market of sotheast asia by

  13. Estimation of suppliers as an important element of the rationalization of supply processes – case study

    Directory of Open Access Journals (Sweden)

    2011-06-01

    Full Text Available To increase the efficiency of the business in times of the globalization and increasing competition, the management of the companies looks for opportunities to achieve higher incomes or to reduce the costs of inputs. One of possible methods to obtain higher efficiency is to put the emphasize on the relationships with suppliers. This is very important element of an effective management of the company, because by determining the economical conditions of the cooperation, it is possibly to reduce the cost of business activities. The reliable classification of the suppliers is depended on the level of the detail of an assessment criteria and the scoring method. The main problem is the risk of the objective estimation of individual offers received from the suppliers. For this reason, the classification of suppliers is one of the key problems of the logistics controlling. Based on practical example, this paper presents the complexity of the problem of the classifications and the selection of suppliers according to different hierarchy of the importance of various criteria.

  14. A Fuzzy-Grey Multicriteria Decision Making Approach for Green Supplier Selection in Low-Carbon Supply Chain

    Directory of Open Access Journals (Sweden)

    Qinghua Pang

    2017-01-01

    Full Text Available Due to the increasing awareness of global warming and environmental protection, many practitioners and researchers have paid much attention to the low-carbon supply chain management in recent years. Green supplier selection is one of the most critical activities in the low-carbon supply chain management, so it is important to establish the comprehensive criteria and develop a method for green supplier selection in low-carbon supply chain. The paper proposes a fuzz-grey multicriteria decision making approach to deal with these problems. First, the paper establishes 4 main criteria and 22 subcriteria for green supplier selection. Then, a method integrating fuzzy set theory and grey relational analysis is proposed. It uses the membership function of normal distribution to compare each supplier and uses grey relation analysis to calculate the weight of each criterion and improves fuzzy comprehensive evaluation. The proposed method can make the localization of individual green supplier more objectively and more accurately in the same trade. Finally, a case study in the steel industry is presented to demonstrate the effectiveness of the proposed approach.

  15. Operational Complexity of Supplier-Customer Systems Measured by Entropy—Case Studies

    Directory of Open Access Journals (Sweden)

    Ladislav Lukáš

    2016-04-01

    Full Text Available This paper discusses a unified entropy-based approach for the quantitative measurement of operational complexity of company supplier-customer relations. Classical Shannon entropy is utilized. Beside this quantification tool, we also explore the relations between Shannon entropy and (c,d-entropy in more details. An analytic description of so called iso-quant curves is given, too. We present five case studies, albeit in an anonymous setting, describing various details of general procedures for measuring the operational complexity of supplier-customer systems. In general, we assume a problem-oriented database exists, which contains detailed records of all product forecasts, orders and deliveries both in quantity and time, scheduled and realized, too. Data processing detects important flow variations both in volumes and times, e.g., order—forecast, delivery—order, and actual production—scheduled one. The unifying quantity used for entropy computation is the time gap between actual delivery time and order issue time, which is nothing else but a lead time in inventory control models. After data consistency checks, histograms and empirical distribution functions are constructed. Finally, the entropy, information-theoretic measure of supplier-customer operational complexity, is calculated. Basic steps of the algorithm are mentioned briefly, too. Results of supplier-customer system analysis from selected Czech small and medium-sized enterprises (SMEs are presented in various computational and managerial decision making details. An enterprise is ranked as SME one, if it has at most 250 employees and its turnover does not exceed 50 million USD per year, or its balance sheet total does not exceed 43 million USD per year, alternatively.

  16. Bidding strategy in pay-as-bid markets based on supplier-market interaction analysis

    International Nuclear Information System (INIS)

    Bigdeli, N.; Afshar, K.; Fotuhi-Firuzabad, M.

    2010-01-01

    In this paper, a new bidding strategy for pay-as-bid market suppliers is introduced. This method is based on a systematic analysis of interactions of market with the suppliers via several market indices as well as forecasting important indices by artificial neural networks. Besides, the proposed method considers the practical limitations in the system and deals with incomplete information handling, closely. Next, a strategic bidding approach is proposed for optimal bidding by the suppliers. In these investigations, the paper focus is on the experimental situation of Iran electricity market as a pay-as-bid market and a sample generating company with several generating units from this market is considered as the benchmark. The results of applying this approach to this generating company are representative of good performance of the proposed method.

  17. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR

  18. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

  19. Supplier selection problem: A fuzzy multicriteria approach | Allouche ...

    African Journals Online (AJOL)

    The purpose of this paper is to suggest a fuzzy multi-criteria approach to solve the supplier selection problem, an approach based on the fuzzy analytic hierarchy process and imprecise goal programming. To deal with decision-maker (DM) preferences, the concept of satisfaction function is introduced. The proposed ...

  20. 77 FR 76959 - Energy Conservation Program: Request for Exclusion of 100 Watt R20 Short Incandescent Reflector...

    Science.gov (United States)

    2012-12-31

    ... subject to energy conservation standards, the manufacturers removed the product from the market... Conservation Program: Request for Exclusion of 100 Watt R20 Short Incandescent Reflector Lamp From Energy Conservation Standards AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION...