WorldWideScience

Sample records for water sub-sea equipment

  1. Installation of deep water sub-sea equipment

    Energy Technology Data Exchange (ETDEWEB)

    Pollack, Jack; Demian, Nabil [SBM-IMODCO Inc., Houston, TX (UNited States)

    2004-07-01

    Offshore oil developments are being planned in water depths exceeding 2000 m. Lowering and positioning large, heavy sub sea hardware, using conventional methods, presents new technical challenges in these ultra deep waters. In 3000 m a safe lift using conventional steel cables will require more capacity to support the cable self weight than the static payload. Adding dynamic loads caused by the motions of the surface vessel can quickly cause the safe capacity of the wire to be exceeded. Synthetic ropes now exist to greatly reduce the lowering line weight. The lower stiffness of these synthetic ropes aggravate the dynamic line tensions due to vessel motions and relatively little is known about the interaction of these ropes on the winches and sheaves required for pay-out and haul-in of these lines under dynamic load. Usage of conventional winches would damage the synthetic rope and risk the hardware being deployed. Reliable and economic installation systems that can operate from existing installation vessels are considered vital for ultra deep-water oil development. The paper describes a Deep Water Sub-Sea Hardware Deployment system consisting of a buoy with variable, pressure-balanced buoyancy, which is used to offset most of the payload weight as it is lowered. The buoyant capacity is controlled by air pumped into the tank from the surface vessel through a reinforced hose. The buoy and payload motion are isolated from the deployment line surface dynamics using a simple passive heave compensator mounted between the buoy and the bottom of the deployment rope. The system components, functionality and dynamic behavior are presented in the paper. (author)

  2. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  3. Innovative sub sea pipeline maintenance in line with emerging offshore trends and maintenance safety standards

    Energy Technology Data Exchange (ETDEWEB)

    Lim, George [T.D. Williamson, Inc., Tulsa, OK (United States)

    2012-07-01

    Sub sea hot tapping of pipelines is performed for a variety of reasons, including tie-ins, pipeline repair, insertion of instrumentation, facilitating chemical injection or providing access for temporary isolation tools. The full hot tap process - that is, installing the hot tap assembly, performing the tap and recovering the hot tap machine - is normally conducted with diver assistance. After bolting the assembly of the machine, isolation valve and fitting to the pipeline (or machine and isolation valve to a pre-installed flanged membrane on the pipeline), the divers then operate the machine to perform the tap, under instructions from - and supervision by - hot tap technicians located on deck of the diving support vessel (DSV). Subsequent unbolting and removal of the hot tap machine is also carried out by the divers. The demands of deep water have necessitated development of a totally diver-less, remote-controlled system. Diver operations are limited to a maximum of 300 meters of water depth, whereas a significant portion of existing sub sea field infrastructure, as well as projected future developments, are in deeper waters in depths up to 3,000 meters. In addition, diver safety concerns in shallow water, as well as impaired diver efficiency in difficult environmental conditions such as wave breaking zones, prompts the call for a reduction of diver exposure or complete elimination of diver assistance. The recent completion of a remote-controlled hot tap machine (the Sub sea 1200RC Tapping Machine) is a first step toward developing a totally diver-less system. The installation of the hot tap assembly and subsequent removal of the machine still require diver assistance, but the performance of the tap itself is remotely controlled by a hot tap technician from the deck of the DSV. The concept is a topside-driven hot tap machine with 'passive Remote Operating Vehicle (ROV) interface', which means a stationary ROV with its hydraulics and control system

  4. Converter fed sub sea motor drives

    Energy Technology Data Exchange (ETDEWEB)

    Raad, R O

    1995-09-01

    Minor offshore gas and oil resources located 20-50 km from existing installations may often be commercially exploited only by use of complete sub sea solutions. This thesis deals with analyses of a sub sea adjustable speed electric motor which is fed by a frequency converter via a long cable (up to 50 km) between the converter and the motor. The author develops a general model for analysing such motor drive systems with the objective of verifying the feasibility of specific applications and of specifying the requirements on the system components. The simulation model is used to identify the critical frequency ranges in which the converter must not generate significant harmonics, to verify the start-up strategy chosen, and to verify the stability with potential disturbances applied to the system. Simulation models are developed for both transient and steady state analyses. They are accurate up to 5 kHz and can incorporate the frequency dependency of the motor and cable parameters. Ideal thyristors and diodes are used. The models are implemented in existing simulation tools. Most of the results relate to a base case with a 670 kW squirrel cage motor fed from a 30 km long cable, but cases with 3 MW rating or with 50 km cable have also been analyzed and found to be feasible. Each specific application must be separately studied. Results of simulation calculations are presented and conclusions given. 53 refs., 124 figs., 23 tabs.

  5. Impacts of Water Quality on Residential Water Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Widder, Sarah H.; Baechler, Michael C.

    2013-11-01

    Water heating is a ubiquitous energy use in all residential housing, accounting for 17.7% of residential energy use (EIA 2012). Today, there are many efficient water heating options available for every fuel type, from electric and gas to more unconventional fuel types like propane, solar, and fuel oil. Which water heating option is the best choice for a given household will depend on a number of factors, including average daily hot water use (total gallons per day), hot water draw patterns (close together or spread out), the hot water distribution system (compact or distributed), installation constraints (such as space, electrical service, or venting accommodations) and fuel-type availability and cost. While in general more efficient water heaters are more expensive than conventional water heating technologies, the savings in energy use and, thus, utility bills can recoup the additional upfront investment and make an efficient water heater a good investment over time in most situations, although the specific payback period for a given installation will vary widely. However, the expected lifetime of a water heater in a given installation can dramatically influence the cost effectiveness and savings potential of a water heater and should be considered, along with water use characteristics, fuel availability and cost, and specific home characteristics when selecting the optimum water heating equipment for a particular installation. This report provides recommendations for selecting and maintaining water heating equipment based on local water quality characteristics.

  6. Utilization of balance equipment in windsurf beginners off water training.

    OpenAIRE

    Frič, Čestmír

    2013-01-01

    Work name: Utilization of balance equipment in windsurf beginners off water training. Aim of work: To determin and evaluate significance of balance equipment in off water training. Method: The method of comparative experiment have been used in this thesis. Than the obtained data were evaluated. It was nessesary to create and compare two groups of people, compound of young healthy individuals in the age 20 - 30 both male and female. The only condition for the research was their zero experience...

  7. Classification of methods and equipment recovery secondary waters

    Directory of Open Access Journals (Sweden)

    G. V. Kalashnikov

    2017-01-01

    Full Text Available The issues of purification of secondary waters of industrial production have an important place and are relevant in the environmental activities of all food and chemical industries. For cleaning the transporter-washing water of beet-sugar production the key role is played by the equipment of treatment plants. A wide variety of wastewater treatment equipment is classified according to various methods. Typical structures used are sedimentation tanks, hydrocyclones, separators, centrifuges. In turn, they have a different degree of purification, productivity through the incoming suspension and purified secondary water. This is equipment is divided into designs, depending on the range of particles to be removed. A general classification of methods for cleaning the transporter-washing water, as well as the corresponding equipment, is made. Based on the analysis of processes and instrumentation, the main methods of wastewater treatment are identified: mechanical, physicochemical, combined, biological and disinfection. To increase the degree of purification and reduce technical and economic costs, a combined method is widely used. The main task of the site for cleaning the transporter-washing waters of sugar beet production is to provide the enterprise with water in the required quantity and quality, with economical use of water resources, taking into account the absence of pollution of surface and groundwater by industrial wastewater. In the sugar industry is currently new types of washing equipment of foreign production are widely used, which require high quality and a large amount of purified transporter-washing water for normal operation. The proposed classification makes it possible to carry out a comparative technical and economic analysis when choosing the methods and equipment for recuperation of secondary waters. The main equipment secondary water recovery used at the beet-sugar plant is considered. The most common beet processing plant is a

  8. Method and equipment for treating waste water resulting from the technological testing processes of NPP equipment

    International Nuclear Information System (INIS)

    Radulescu, M. C.; Valeca, S.; Iorga, C.

    2016-01-01

    Modern methods and technologies coupled together with advanced equipment for treating residual substances resulted from technological processes are mandatory measures for all industrial facilities. The correct management of the used working agents and of the all wastes resulted from the different technological process (preparation, use, collection, neutralization, discharge) is intended to reduce up to removal of their potential negative impact on the environment. The high pressure and temperature testing stands from INR intended for functional testing of nuclear components (fuel bundles, fuelling machines, etc.) were included in these measures since the use of oils, demineralized water chemically treated, greases, etc. This paper is focused on the method and equipment used at INR Pitesti in the chemical treatment of demineralized waters, as well as the equipment for collecting, neutralizing and discharging them after use. (authors)

  9. Spectrophotometric determination of silica in water with Hach equipment

    International Nuclear Information System (INIS)

    Acosta L, E.

    1992-06-01

    The method for the determination of the silica element in water, demineralized water, raw waters, laundry waters, waters treated with ion exchange resins and sea waters using the indicated technique in the operation manual of the Hach equipment with a DR/3 spectrophotometer is described. This method covers the determination of the silica element in the interval from 0 to 1.5 mg/l on 50 ml. of base sample. These limits its can be variable if the size of the used aliquot one is changed for the final determination of the silica element. (Author)

  10. Spectrophotometric determination of fluorides in water with Hach equipment

    International Nuclear Information System (INIS)

    Acosta L, E.

    1994-11-01

    The spectrophotometric method for the determination of the fluoride ion in water, demineralized water, raw waters, laundry waters and waters treated with ion exchange resins , using the technique and the SPADNS coloring indicated in the operation manual of the Hach equipment is described. This method covers the determination of the fluoride ion in the range from 0 to 2 mg/l on 25 ml. of radioactive base sample. These limits can be variable if the size of the used aliquot one is changed for the final determination of the fluoride ion. (Author)

  11. An investigation on groundwater recovery rate within sub sea floor tunnels at closed coal mines

    International Nuclear Information System (INIS)

    Nakata, Eiji; Suenaga, Hiroshi; Oyama, Takahiro; Nomura, Tokisada; Ichihara, Yoshihisa

    2008-01-01

    The groundwater recovery rate investigated at the closed coal mines extended within sub sea floor tunnels. The Ikeshima and the Taiheiyo coal mine companies exploited the deep coal-bearing strata beneath the ocean. Ikeshima coal mine, excavated S.L. -650m to 6km offshore from Ikeshima island, was closed at November 2002, and Taiheiyo coal mine, excavated S.L. -720m to 9km offshore from Hokkaido, was stopped to excavate from the deep area at January 2003. After closing and stopping of development, we began the investigation of the groundwater recovery rate at both coal mines. The groundwater level of Ikeshima coal mine raised +405m per 1.8 years at the main shaft. The permeability coefficient estimated between 10 - 8 m /s and 10 -6 m/s to use the water recovery rate at the shaft. Otherwise, at Taiheiyo coal mine, we measured the air pressure in tubes used by 3.5km 2.5km, and 1.5km length 2mm diameters tubes to estimate the groundwater recovery level at the 3.2km offshore plug site. Groundwater didn't reach 4.7km (1.5+3.2km) area until November 2004. There were breakdown of shotcleate and rock mass from the roof of tunnel at 5.3km from offshore line. In this paper, we try to show the groundwater recovery rate of these sub sea floor collieries. (author)

  12. Domestic manufacturing and reliability improvement of reactor water recirculation equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidekazu; Oi, Masao; Shida, Toichi; Yokomori, Takashi

    1982-01-01

    The reactor coolant recirculation system is one of the important systems to control the reactor output in BWR nuclear power plants. Its components require high reliability and maintainability as well as controllability. For many Japanese nuclear power plants, recirculation pumps, fluid couplings and others have been imported so far. Hitachi Ltd. has established a domestic manufacturing organization through the development and test of these equipment. The fundamental design conditions for these equipment are the improvement of the rate of utilization of plant facility, the capability to follow load, and output power stability. In this paper, the specifications, the investigation of moment of inertia and the design features of recirculation pumps, driving motors and variable frequency power supply systems are described. The paper also reports on the combination test implemented to evaluate the recirculation system. The combination test includes the test using water rheostat for the power source facility and the loading test for a recirculation pump. The application of those system equipment to an actual plant was analyzed and evaluated on a basis of the test data obtained. The result showed that the equipment can achieve the rate of change of reactor power of 30%/min. Those equipment have been employed for No. 2 reactor plant of the Fukushima No. 2 Nuclear Power Station, the Tokyo Electric Power Co., Inc. (Wakatsuki, Y.)

  13. Making equipment to process paddy water for providing drinking water by using Ozone-UVC& Ultrafiltration

    Science.gov (United States)

    Styani, E.; Dja'var, N.; Irawan, C.; Hanafi

    2018-01-01

    This study focuses on making equipment which is useful to process paddy water to be consumable as drinking water by using ozone-UVC and ultrafiltration. The equipment which is made by the process of ozone-UVC and ultrafiltration or reverse osmosis is driven by electric power generated from solar panels. In the experiment, reverse osmosis system with ozone-UVC reactor proves to be good enough in producing high quality drinking water.

  14. Hydrate prevention in petroleum production sub sea system

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Paula L.F.; Rocha, Humberto A.R. [Universidade Estacio de Sa (UNESA), Rio de Janeiro, RJ (Brazil); Rodrigues, Antonio P. [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil)

    2012-07-01

    In spite of the merits of the several hydrate prevention techniques used nowadays, such as: chemical product injection for inhibition and use of thick thermal insulate lines; hydrates per times happen and they are responsible for considerable production losses. Depressurization techniques can be used so much for prevention as in the remediation. Some hydrate removal techniques need a rig or vessel, resources not readily available and with high cost, reason that limits such techniques just for remediation and not for prevention. In the present work it is proposed and described an innovative depressurization system, remote and resident, for hydrate prevention and removal, applicable as for individual sub sea wells as for grouped wells by manifold. Based on low cost jet pumps, without movable parts and with a high reliability, this technique allows hydrate prevention or remediation in a fast and remote way, operated from the production unit. The power fluid line and fluid return line can be integrated in the same umbilical or annulus line structure, without significant increase in the construction costs and installation. It is not necessary to wait for expensive resource mobilization, sometimes not available quickly, such as: vessels or rigs. It still reduces the chemical product consumption and permits to depressurized stopped lines. Other additional advantage, depressurization procedure can be used in the well starting, removing fluid until riser emptying. (author)

  15. Development of pre-startup equipment for light water reactors

    International Nuclear Information System (INIS)

    Ram, Rajit; Borkar, S.P.; Dixit, M.Y.; Das, Debashis; Patil, R.K.

    2010-01-01

    Light water reactor (LWR) core typically has high excess reactivity as compared to Pressurized Heavy Water Reactor (PHWR). Unlike PHWR, where online refueling is done, LWR is operated for a long period to achieve maximum fuel burn-up before refueling. Since the reactivity is always reducing with burn-up of the core, the positions of control rods at criticality are always changing in a single direction, i.e. away from the core. Therefore it is possible to start the LWR even if the nuclear instrumentation is not online, provided the criticality position of control rods is known for previous operation. However, for the very first startup, the criticality position of control rods is required to be determined. A special nuclear instrumentation system, called Pre-startup equipment (PSE) is developed using two numbers of in-core detectors along with the processing electronics. The PSE enables operators to determine the criticality position of control rods for the first startup at zero power. The same equipment can also be used during loading of fuel assemblies. This paper discusses the features and architecture of PSE, its individual circuit blocks and specifications. (author)

  16. Design guide for heat transfer equipment in water-cooled nuclear reactor systems

    International Nuclear Information System (INIS)

    1975-07-01

    Information pertaining to design methods, material selection, fabrication, quality assurance, and performance tests for heat transfer equipment in water-cooled nuclear reactor systems is given in this design guide. This information is intended to assist those concerned with the design, specification, and evaluation of heat transfer equipment for nuclear service and the systems in which this equipment is required. (U.S.)

  17. Water Supply and Treatment Equipment. Change Notice 1

    Science.gov (United States)

    2014-08-05

    Coagulation Filtration Total Dissolved Solids Water Quality Conductivity Potable water Turbidity Water Treatment/Purification Disinfection ...microorganisms (pathogenic) found in the raw water . The preferred Army field method of water disinfection is chlorination. Filtration Filtration...senses. It looks, tastes, and smells good and is neither too hot nor too cold. Potable water Water that is safe for drinking . Reverse osmosis

  18. Improvement of Equipment reliability for Auxiliary Feed Water System

    Energy Technology Data Exchange (ETDEWEB)

    Deok, Lee Sang; Kwan, Lee Yong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    According to AP913 ER) of INPO, Number of the event related to equipment is higher than others like external or human performance. In the top 25 systems, Auxiliary feed water system is the seventh highest among systems. AWFS consists of many component and complex system and Main Function of AFWS is to supply feedwater to the steam generators for the removal of heat from the RCS(Reactor Coolant System) in event the main feedwater system is unavailable following a transient or accident. Reliability of component means how well operate on demands and monitoring is necessary to keep track of condition of component. If component performance is lower than the required value, corrective action for failure mode should be done. The objective of this study is focused to improve of AF pump by adding the tasks of SHR(System Health Report) into the task of system engineer walkdown of PMT(Preventive Maintenance Template). Increasing the reliability of AF pump will contribute to improvement of reliability of AFWS. Based on operating history, there was high vibration of AF pump during performance test. In that case, there were a lot of maintenance works for normal operation of AF pump. Vibration problem related pump can't be detected by tasks of SE walkdown because it's not running during normal operation except for surveillance test. CHR(Component Health Report) of AF pump in AFWS can be made from necessary part which means monitoring and functional failure because problem of Stand-by pump can be covered by conducting monitoring and analysis of functional failure. To improve reliability of AF pump, walkdown of PMT and SHR should be conducted both in accordance with surveillance test frequency. Health of AF pump based on operation history can be verified first and then can find out which parts of pump are weak. Finally, weak part can be managed intensively and failure can be reduced according to SE walkdown. But this work can be risky and burdensome because all parts of

  19. Auxiliary equipment for cooling water in a reactor

    International Nuclear Information System (INIS)

    Konno, Yasuhiro; Sakairi, Toshiaki.

    1975-01-01

    Object: To effectively make use of pressure energy of reactor water, which has heretofore been discarded, to enable supply of emergency power supply of high reliability and to prevent spreading of environmental contamination. Structure: Sea water pumped by a sea water supply pump is fed to a heat exchanger. Reactor water carried through piping on the side to be cooled is removed in heat by the heat exchanger to be cooled and returned, and then again returned to the reactor. On the other hand, sea water heated by the heat exchanger is fed to a water wheel to drive the water wheel, after which it is discharged into a discharging path. A generator may be directly connected to the water wheel to use the electricity generated by the generator as the emergency power source. (Kamimura, M.)

  20. About water chemistry influence on equipment reliability of NPP with RBMK-1000

    International Nuclear Information System (INIS)

    Berezina, I.G.; Styazhkin, P.S.; Kritskij, V.G.

    2001-01-01

    In the paper the experience of a quantitative valuation of coolant quality influence on a reliability of some equipment elements of NPP with RBMK-1000 is offered. The choice is made of coolant quality integral parameter. The connection between indices values of coolant quality and reliability of major elements of circulation circuit equipment (including fuel claddings) is established. The reliability improvement of equipment elements operation is supported by high water chemistry quality. (orig.)

  1. Behavioral responses of Arctica islandica (Bivalvia: Arcticidae) to simulated leakages of carbon dioxide from sub-sea geological storage

    International Nuclear Information System (INIS)

    Bamber, Shaw D.; Westerlund, Stig

    2016-01-01

    Highlights: • Valve pumping activity in A. islandica significantly increased at pH 6.2 seawater. • Changes in valve movements were not related to attempted burrowing activities. • Valve activity returned to control levels after 5 days of continuous exposure. • A. islandica tolerate pH reductions likely to follow leakage of sub-sea stored CO_2. - Abstract: Sub-sea geological storage of carbon dioxide (CO_2) provides a viable option for the Carbon Capture and Storage (CCS) approach for reducing atmospheric emissions of this greenhouse gas. Although generally considered to offer a low risk of major leakage, it remains relevant to establish the possible consequences for marine organisms that live in or on sediments overlying these storage areas if such an event may occur. The present study has used a series of laboratory exposures and behavioral bioassays to establish the sensitivity of Arctica islandica to simulated leakages of CO_2. This long-lived bivalve mollusc is widely distributed throughout the North Sea, an area where geological storage is currently taking place and where there are plans to expand this operation significantly. A recently published model has predicted a maximum drop of 1.9 pH units in seawater at the point source of a substantial escape of CO_2 from sub-sea geological storage in this region. Valve movements of A. islandica exposed to reduced pH seawater were recorded continuously using Hall effect proximity sensors. Valve movement regulation is important for optimising the flow of water over the gills, which supplies food and facilitates respiration. A stepwise reduction in seawater pH showed an initial increase in both the rate and extent of valve movements in the majority of individuals tested when pH fell to 6.2 units. Exposing A. islandica to pH 6.2 seawater continuously for seven days resulted in a clear increase in valve movements during the first 40 h of exposure, followed by a gradual reduction in activity intensity over the

  2. Behavioral responses of Arctica islandica (Bivalvia: Arcticidae) to simulated leakages of carbon dioxide from sub-sea geological storage

    Energy Technology Data Exchange (ETDEWEB)

    Bamber, Shaw D., E-mail: shaw.bamber@iris.no; Westerlund, Stig, E-mail: sw@iris.no

    2016-11-15

    Highlights: • Valve pumping activity in A. islandica significantly increased at pH 6.2 seawater. • Changes in valve movements were not related to attempted burrowing activities. • Valve activity returned to control levels after 5 days of continuous exposure. • A. islandica tolerate pH reductions likely to follow leakage of sub-sea stored CO{sub 2}. - Abstract: Sub-sea geological storage of carbon dioxide (CO{sub 2}) provides a viable option for the Carbon Capture and Storage (CCS) approach for reducing atmospheric emissions of this greenhouse gas. Although generally considered to offer a low risk of major leakage, it remains relevant to establish the possible consequences for marine organisms that live in or on sediments overlying these storage areas if such an event may occur. The present study has used a series of laboratory exposures and behavioral bioassays to establish the sensitivity of Arctica islandica to simulated leakages of CO{sub 2}. This long-lived bivalve mollusc is widely distributed throughout the North Sea, an area where geological storage is currently taking place and where there are plans to expand this operation significantly. A recently published model has predicted a maximum drop of 1.9 pH units in seawater at the point source of a substantial escape of CO{sub 2} from sub-sea geological storage in this region. Valve movements of A. islandica exposed to reduced pH seawater were recorded continuously using Hall effect proximity sensors. Valve movement regulation is important for optimising the flow of water over the gills, which supplies food and facilitates respiration. A stepwise reduction in seawater pH showed an initial increase in both the rate and extent of valve movements in the majority of individuals tested when pH fell to 6.2 units. Exposing A. islandica to pH 6.2 seawater continuously for seven days resulted in a clear increase in valve movements during the first 40 h of exposure, followed by a gradual reduction in activity

  3. Development of equipment for in situ studies of biofilm in hot water systems

    DEFF Research Database (Denmark)

    Bagh, Lene Karen; Albrechtsen, Hans-Jørgen; Arvin, Erik

    1999-01-01

    New equipment was developed for in situ studies of biofilms in hot water tanks and hot water pipes under normal operation and pressure. Sampling ports were installed in the wall of a hot water tank and through these operating shafts were inserted with a test plug in the end. The surface of the test...

  4. Modeling sub-sea permafrost in the East Siberian Arctic Shelf: the Dmitry Laptev Strait

    International Nuclear Information System (INIS)

    Nicolsky, D; Shakhova, N

    2010-01-01

    The present state of sub-sea permafrost modeling does not agree with certain observational data on the permafrost state within the East Siberian Arctic Shelf. This suggests a need to consider other mechanisms of permafrost destabilization after the recent ocean transgression. We propose development of open taliks wherever thaw lakes and river paleo-valleys were submerged shelf-wide as a possible mechanism for the degradation of sub-sea permafrost. To test the hypothesis we performed numerical modeling of permafrost dynamics in the Dmitry Laptev Strait area. We achieved sufficient agreement with the observed distribution of thawed and frozen layers to suggest that the proposed mechanism of permafrost destabilization is plausible.

  5. Alternative water injection device to reactor equipment facility

    International Nuclear Information System (INIS)

    Yamashita, Masahiro.

    1995-01-01

    The device of the present invention injects water to the reactor and the reactor container continuously for a long period of time for preventing occurrence of a severe accident in a BWR type reactor and maintaining the integrity of the reactor container even if the accident should occur. Namely, diesel-driven pumps disposed near heat exchangers of a reactor after-heat removing system (RHR) are operated before the reactor is damaged by the after heat to cause reactor melting. A sucking valve disposed to a pump sucking pipeline connecting a secondary pipeline of the RHR heat exchanger and the diesel driving pump is opened. A discharge valve disposed to a pump discharge pipeline connecting a primary pipeline of the RHR heat exchanger and the diesel driving pump is opened. With such procedures, sea water is introduced from a sea water taking port through the top end of the secondary pipeline of the RHR heat exchanger and water is injected into the inside of the pressure vessel or the reactor container by way of the primary pipeline of the RHR heat exchanger. As a result, the reactor core is prevented from melting even upon occurrence of a severe accident. (I.S.)

  6. Nuclear equipment to determine soil and water mass attenuation coefficients

    International Nuclear Information System (INIS)

    Zucchi, O.L.A.D.; Nascimento Filho, V.F. do

    1984-01-01

    The feasibility of substituting the monochannel gamma spectrometer, traditionally used in the gamma ray attenuation technique, for a less sophisticated and less expensive system of integral counting is studied. The proposed system can be operated by a non-specialized person. Three detection systems were used in the determination of the mass attenuation coefficients for different types of soil and for water. (M.A.C.) [pt

  7. Equipment for a 'non-stop' water infusion system

    Energy Technology Data Exchange (ETDEWEB)

    Deprez, J C

    1978-01-01

    This paper gives a definition of the non-stop infusion system (technique employed during the winning operation to prevent the emission of coal-dust). The system works at low-output and reduced pressure level; delivery and control is continuous. Explains the principles behind the MECANELEC flow regulator and the SCHLUMBERGER device to monitor correct operation. Describes a SCHLUMBERGER unit used in the Houilleres de Blanzy as well as a combined MECANELEC-SCHLUMBERGER installation in service at HBNPC. This combination allows water infusion to be carried out as required by the conditions. Possibility of introducing necessary improvements (such as a device to prevent leakage) is discussed.

  8. Stress corrosion cracking of equipment materials in domestic pressurized water reactors and the relevant safety management

    International Nuclear Information System (INIS)

    Sun Haitao

    2015-01-01

    International and domestic research and project state about stress corrosion cracking of nuclear equipments and materials (including austenitic stainless steel and nickel based alloys) in pressurized water reactor are discussed, and suggestions on how to prevent, mitigate ana deal with the stress corrosion cracking issues in domestic reactors are given in this paper based on real case analysis and study ondomestic nuclear equipment and material stress corrosion cracking failure. (author)

  9. Chlorine dioxide as a disinfectant for Ralstonia solanacearum control in water, storage and equipment

    Directory of Open Access Journals (Sweden)

    Popović Tatjana

    2016-01-01

    Full Text Available Brown rot or bacterial wilt caused by bacterium Ralstonia solanacearum is the main limiting factor in potato production. Quarantine measures are necessary to avoid spread of disease to disease-free areas. R. solanacearum has been shown to contaminate watercourses from which crop irrigation is then prohibited causing further potential losses in yield and quality. The bacteria also spread via surfaces that diseased seed potatoes come into contact with. This study showed bactericidal activity of chlorine dioxide (CIO2 on R. solanacearum for disinfection of water, surface and equipment. The results showed that CIO2 solution at concentration of 2 ppm at 30 minutes of exposure time had bactericidal effect for disinfection of water. For surface and equipment disinfection, concentration of 50 ppm showed total efficacy at 30 min and 5 sec exposure time, respectively. Results suggest that use of CIO2 as a disinfectant has a potential for control of brown rot pathogen in water, storage and equipment.

  10. IRRIGATION STATION EQUIPMENT FOR PREVENTING THE USE OF LOW WATER QUALITY

    Directory of Open Access Journals (Sweden)

    Constantin Nicolescu

    2010-01-01

    Full Text Available In Romania the economically efficient irrigated area is estimated at 3.5 million hectares. On national scale there is nointegrated approach for monitoring the quantity and quality of the irrigation water, using adequate equipment at thepumping station. On international scale, in many countries the pumping stations are provided with equipment formonitoring, on real time, the quality or the pumped water and for warning about critical situations (emergencies.This paper describes a technical solution consisting of equipment which monitors the following parameters of waterpumped in irrigation systems: turbidity, pH, CE at 25 o C, Na+, Cl-. The lapse of time for monitoring is of 10 to 60 min.The main components are the following: the sampling pump (submersible the monitoring board, the repression pipe ofthe analyzed water. Warnings are made about values exceeding the programmed level for each monitored parameter,about the fact that the pump and agitator do not work or about any other source of damage.The technical solution and equipment were tested at a pumping station which uses water from Danube, in most casesmixed with water originating from drainage. Results showed a reduction of the total content of soluble salts from soiland of their negative impact upon the crops, a reduction of the degree of river alluvial deposits within the irrigationsystem and reduction of the energetic consumption required for pumping.

  11. A system of radiation monitoring, and methods and equipment for measuring water of low specific activity

    International Nuclear Information System (INIS)

    Sivintsev, Yu.V.

    1975-01-01

    The author considers criteria for the radiation protection of the population and the environment. He describes the role of procedures for monitoring waters of low specific activity in the framework of a system for ensuring the radiation safety of the population living near a nuclear power station. The main technical characteristics (background, efficiency, sensitivity) of the laboratory equipment for gamma spectrometric analysis of water samples of low specific activity are discussed. (author)

  12. MIC damage in a water coolant header for remote process equipment

    International Nuclear Information System (INIS)

    Jenkins, C.F.

    1994-01-01

    Stainless steel water piping used to supply coolant for remote chemical separations equipment developed leaks during low flow conditions resulting from an extended interruption of operations. All the leaks occurred at welds in the bottom zone of the pipe, which was blanketed with silt deposits from the unfiltered well water used for cooling. Ultrasonic, radiographic, and metallographic examinations of leak sites revealed worm hole pitting adjacent to the welds. Seepage at the penetrations was strongly acidic and resulted in corrosion on the external pipe surfaces beneath brown crusty deposits which had developed. Analyses of the water and deposits suggest a strong propensity toward microbiologically influenced corrosion (MIC) and fouling

  13. MIC damage in a water coolant header for remote process equipment

    International Nuclear Information System (INIS)

    Jenkins, C.F.

    1996-01-01

    Stainless steel water piping, used to supply coolant for remote chemical separations equipment, developed several leaks during low flow conditions, the result of an extended interruption of operations. All the leaks occurred at welds in the bottom of the pipe, which was blanketed with silt deposits from unfiltered well water used for cooling. Ultrasonic, radiographic, and metallographic examinations of the leak sites revealed worm-hole pitting adjacent to the welds. Seepage at the penetrations was strongly acidic and corroded the external pipe surfaces. Analyses of the water and deposits suggested microbiologically influenced corrosion and fouling

  14. Cleaning of the equipment of residual sodium by means of water-vacuum technology

    International Nuclear Information System (INIS)

    Klykov, B.P.; Lednev, A.I.

    1997-01-01

    Results of investigation into a problem of equipment decontamination from sodium, that have been conducted in OKBM since 1960 are given. The investigations performed have shown that a water-vacuum washing process is the most optimal method for equipment decontamination from sodium residues. The essence of the method is in conduction of sodium-water reaction under reduced pressure in a leak-tight tank. Boundary conditions are selected experimentally which not allow sodium to be melted during the process, that gives possibility to control the sodium-water reaction. Continuous removal of H 2 and reaction products creates safe conditions for the process conduction. More that 20-year period of operation of a stationary water-vacuum facility and washing the electromagnetic pump for BN-350 fast nuclear reactor directly at is test rig are the best proofs of the proposed method. This method is well suitable for washing the equipment contaminated by radioactive sodium, because by-products of the process are simply utilized. The method is used in a number of Russian enterprises, and recommended for implementation at BN-350 and BN-600 reactor plants. (author)

  15. [Investigation of microbial contamination of the air and equipment of a biological waste water purification station].

    Science.gov (United States)

    Alikbaeva, L A; Figurovskiĭ, A P; Vasil'ev, O D; Ermolaev-Makovskiĭ, M A; Merkur'eva, M A

    2010-01-01

    The paper describes the results of a study of ambient air microbiological pollution in the working premises and equipment surfaces in the main shops of the biological waste water purification station of a cardboard-polygraphic plant. The findings suggest that there is high microbial contamination of the working environment, which should be born in mind on developing measures to optimize working conditions and on studying morbidity rates among the workers.

  16. Mathematical Model of a Lithium-Bromide/Water Absorption Refrigeration System Equipped with an Adiabatic Absorber

    Directory of Open Access Journals (Sweden)

    Salem M. Osta-Omar

    2016-11-01

    Full Text Available The objective of this paper is to develop a mathematical model for thermodynamic analysis of an absorption refrigeration system equipped with an adiabatic absorber using a lithium-bromide/water (LiBr/water pair as the working fluid. The working temperature of the generator, adiabatic absorber, condenser, evaporator, the cooling capacity of the system, and the ratio of the solution mass flow rate at the circulation pump to that at the solution pump are used as input data. The model evaluates the thermodynamic properties of all state points, the heat transfer in each component, the various mass flow rates, and the coefficient of performance (COP of the cycle. The results are used to investigate the effect of key parameters on the overall performance of the system. For instance, increasing the generator temperatures and decreasing the adiabatic absorber temperatures can increase the COP of the cycle. The results of this mathematical model can be used for designing and sizing new LiBr/water absorption refrigeration systems equipped with an adiabatic absorber or for optimizing existing aforementioned systems.

  17. Performance test of ex-core high temperature and high pressure water loop test equipment (Contract research)

    International Nuclear Information System (INIS)

    Nakano, Hiroko; Uehara, Toshiaki; Takeuchi, Tomoaki; Shibata, Hiroshi; Nakamura, Jinichi; Matsui, Yoshinori; Tsuchiya, Kunihiko

    2016-03-01

    In Japan Atomic Energy Agency, we started research and development so as to monitor the situations in the Nuclear Plant Facilities during a severe accident, such as a radiation-resistant monitoring camera, a radiation-resistant transmission system for conveying the in-core information, and a heat-resistant signal cable. As a part of developments of the heat-resistant signal cable, we prepared ex-core high-temperature and high-pressure water loop test equipment, which can simulate the conditions of BWRs and PWRs, for evaluating reliability and properties of sheath materials of the cable. This equipment consists of autoclave, water conditioning tank, high-pressure metering pump, preheater, heat exchanger and water purification equipment, etc. This report describes the basic design and the performance test results of ex-core high-temperature and high-pressure water loop test equipment. (author)

  18. Suitability of electrolyzed oxidizing water for the disinfection of hard surfaces and equipment in radiology.

    Science.gov (United States)

    Pintaric, Robert; Matela, Joze; Pintaric, Stefan

    2015-01-01

    Hospitals are faced with increasingly resistant strains of micro-organisms. When it comes to disinfection, individual parts of electronic equipment of angiology diagnostics such as patient couches of computer tomography (CT) and magnetic resonance imaging (MRI) scanners prove to be very hard to disinfect. Disinfectants of choice are therefore expected to possess properties such as rapid, residue-free action without any damaging effect on the sensitive electronic equipment. This paper discusses the use of the neutral electrolyzed oxidizing water (EOW) as a biocide for the disinfection of diagnostic rooms and equipment. The CT and MRI rooms were aerosolized with EOW using aerosolization device. The presence of micro-organisms before and after the aerosolization was recorded with the help of sedimentation and cyclone air sampling. Total body count (TBC) was evaluated in absolute and log values. The number of micro-organisms in hospital rooms was low as expected. Nevertheless, a possible TBC reduction between 78.99-92.50% or 50.50-70.60% in log values was recorded. The research has shown that the use of EOW for the air and hard surface disinfection can considerably reduce the presence of micro-organisms and consequently the possibility of hospital infections. It has also demonstrated that the sedimentation procedure is insufficient for the TBC determination. The use of Biocide aerosolization proved to be efficient and safe in all applied ways. Also, no eventual damage to exposed devices or staff was recorded.

  19. Screening Analysis for EPACT-Covered Commercial HVAC and Water-Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Somasundaram, Sriram; Armstrong, Peter R.; Belzer, David B.; Gaines, Suzanne C.; Hadley, Donald L.; Katipumula, S.; Smith, David L.; Winiarski, David W.

    2000-04-25

    The Energy Policy and Conservation Act (EPCA) as amended by the Energy Policy Act of 1992 (EPACT) establishes that the U.S. Department of Energy (DOE) regulate efficiency levels of certain categories of commercial heating, cooling, and water-heating equip-ment. EPACT establishes the initial minimum efficiency levels for products falling under these categories, based on ASHRAE/IES Standard 90.1-1989 requirements. EPCA states that, if ASHRAE amends Standard 90.1-1989 efficiency levels, then DOE must establish an amended uniform national manufacturing standard at the minimum level specified in the amended Standard 90.1 and that it can establish higher efficiency levels if they would result in significant additional energy savings. Standard 90.1-1999 increases minimum efficiency levels for some of the equipment categories covered by EPCA 92. DOE conducted a screening analysis to determine the energy-savings potential for EPACT-covered products meet and exceeding these levels. This paper describes the methodology, data assumptions, and results of the analysis.

  20. Corrosion Study of the Injection Equipments in Water in Al-Ahdeb Wells ‐Iraq

    Directory of Open Access Journals (Sweden)

    Hassan Abdulkadhim Alwan Alsaadi

    2015-01-01

    Full Text Available Water injection equipments such as pipelines, which are used in the second recovery of oil in the Al-Ahdeb wells, suffer from the corrosion in water during maintaining vacuum deoxygenated tower that used to decrease concentration of the dissolved oxygen gas in the water from 6.2-9.1 ppm to o.5 ppm. This study involved calculation the corrosion rates of the internal surfaces of the pipelines either during operation of the vacuum unit or when the tower out of operation. Finally, find the solution by one of the following suggestions. In the first suggestion removal of the dissolved O2 from water is achieved by increasing the dosage of the oxygen scavenger (sodium sulphite. The second suggestion involves removing the dissolved O2 from water by bubbling the oxygenated water with nitrogen gas. The study showed that the corrosion rates of various inside diameter pipelines are between 0.13 mm/yr and 1.5 mm/yr during operation of the vacuum tower and between 3.2 mm/yr and 18.5 mm/yr when the tower out of the operation. While the results showed that the corrosion rate of the pipelines when the tower out of operation reached to the acceptable value of 0.1 mm/y when the dissolved oxygen in the injected water removed by increasing the dosage of the sodium sulphite (Na2SO3 to 48-72 ppm. The results also explained that corrosion rates of the pipelines reached to 0.5 mm/y when the dissolved oxygen removed by bubbling the water with nitrogen gas.

  1. Chitosan membrane development and design of equipment for the removal of heavy metals from water

    International Nuclear Information System (INIS)

    Mora Molina, Jesus; Chaves Barquero, Luis; Araya Marchena, Mario; Starbird Perez, Ricardo

    2012-01-01

    A filtration technique has compared with 1,75% m/v chitosan membranes, crosslinked with glutaraldehyde (0,08% m/v) and without cross link, to quantify the removal capacity of chromium, copper and cadmium ions of model solutions. In addition, a simple and low cost equipment was developed to use with prepared membranes. The main goal has been to use biodegradable materials for removing heavy metals from water, through a low energy consumption, cheap, and applicable to specific problems. Two data sheets were prepared for the membranes and was found that chromium was the metal with the highest removal from water, by using a crosslinked membrane. Metal adsorption was best adjusted to the Freundlich isotherm model, better than Langmuir isotherm model. However, no correlation has been found between pore size of the membranes and crosslinking degree. (author) [es

  2. Chitosan membrane development and design of equipment for the removal of heavy metals from water

    International Nuclear Information System (INIS)

    Mora Molina, Jesus; Starbird Perez, Ricardo; Chaves Barquero, Luis; Araya Marchena, Mario

    2011-01-01

    A filtration technique has compared with 1,75% m/v chitosan membranes, crosslinked with glutaraldehyde (0,08% m/v) and without cross link, to quantify the removal capacity of chromium, copper and cadmium ions of model solutions. In addition, a simple and low cost equipment was developed to use with prepared membranes. The main goal has been to use biodegradable materials for removing heavy metals from water, through a low energy consumption, cheap, and applicable to specific problems. Two data sheets were prepared for the membranes and was found that chromium was the metal with the highest removal from water, by using a crosslinked membrane. Metal adsorption was best adjusted to the Freundlich isotherm model, better than Langmuir isotherm model. However, no correlation has been found between pore size of the membranes and crosslinking degree. (author) [es

  3. Determination of water chemistry parameters which influence on failure intensity of RBMK equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kovalev, S.M.; Kritski, V.G.; Berezina, I.G.; Stjazhkin, P.S.; Olejnik, P.V. [All-Russian Design and Scientific Research Inst. of Complex Power Technology (VNIPIET), St. Petersburg (Russian Federation)

    2002-07-01

    The coolant quality has an effect on intensity of austenitic stainless steel intergranular corrosion. The correlation between rate of intergranular stress corrosion cracking and water electro-conductivity (on generalized data) for non-stabilized stainless steel 304SS type and stabilized stainless steel X18H10T type is shown in Fig. 1. The cracking rate is increased with electro-conductivity rise and this is equivalently to reduction of pipelines lifetime, increase of amount and depth of cracks in welds. The increased values of water electro-conductivity correspond to high concentrations of iron corrosion product, corrosion-active anions (chlorides, sulphates et. al.), arrived to circulation circuit due to failure of equipment elements, for example, of condenser tubes or during start-up. (author)

  4. Efficiency of protective dermal equipment against silver nanoparticles with water aerosol

    International Nuclear Information System (INIS)

    Park, Junsu; Kwak, Byoung Kyu; Kim, Younghun; Yi, Jongheop

    2011-01-01

    Protective dermal equipment (PDE) should be provided for protecting against the penetration of nanomaterials into the skin in the workplace. It is important that workers utilize appropriate PDE with characteristics to accomplish this. During the liquid-phase process, nanomaterials are released with water aerosol, which can easily affect the health of workers. The efficiency of PDE in protecting workers against silver nanoparticles (AgNPs) aerosolized with water aerosol was evaluated. The rate of penetration of AgNPs with water aerosol through cleanroom wear was faster than that for a lab coat. This can be attributed to differences in the filling rate of water, as the result of differences in capillary force. Therefore, humidity appears to be a major factor in the rate of penetration of nanomaterials in the presence of water aerosol. Although no penetration was observed when disposable protective gloves were observed, the presence of AgNPs on the surface of gloves was clearly found. Based on these findings, recommendations for the safe use of PDE can now be made.

  5. THE OPERATION OF POWER EQUIPMENT DURING THE DISPOSAL OF COMBUSTIBLE GASES ASSOCIATED WITH GEOTHERMAL WATER

    Directory of Open Access Journals (Sweden)

    G. Ya. Akhmedov

    2017-01-01

    Full Text Available Objectives. The aim of the study is to assess the appropriateness of utilising combustible gases associated with geothermal water with  low gas factor and the possibility of its practical implementation with  the provision of power equipment operation of geothermal systems  with a nonscaling mode.Methods. The investigations were carried out by analysing the content of associated combustible gases in the underground  thermomineral waters of the Cis-Caucasian deposits on the basis of  an assessment of the feasibility of their utilisation for heating and  hot water supply.Results. A review of practically existing heat and power schemes  utilising geothermal water sources is carried out. Based on the  studies conducted, it is found that methane (70-90% is prevalent in the water under consideration; meanwhile, the content of heavy hydrocarbons does not exceed 10%. The concentration of carbon  dioxide is 3 ÷ 6%, nitrogen 1 ÷ 4%. Depending on the depth of the  aquifer, gas factors range from 1 to 5 m3/ m3. As a result of the  analysis of the operation of typical thermal distribution stations, it is  established that a violation of the carbon dioxide equilibrium in water leads to the formation of a solid phase of calcium carbonate on the  heat exchange surface. A technique for estimating the relationship between the partial pressure of methane and carbon dioxide with the total pressure in a solution of geothermal water is proposed. A  scheme for the efficient operation of thermal distribution stations  with the prevention of carbonate deposits formation by using the  combustion products of the used gas combined with the injection of waste water back into the aquifer is presented.Conclusion. As a result of the conducted studies, the possibility of  using associated combustible gases in geothermal wells is  established using differences in their solubility and that of carbon  dioxide. In this case, the protection of

  6. Modern technologies and equipment for environment and sustainable development at ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Preda, Marius Cristian; Patrascu, Mihai; Pop, Artimisia; Chilom, Rodica

    2004-01-01

    At ROMAG-PROD Heavy Water Plant, the sustainable development concept incorporates as a priority the environmental protection through the production process technology. Norway's Prime Minister, Mr. Gro Harlem Brundtland used the concept of 'sustainable development' in 1987, when as President of International Commission for Environment and Sustainable Development, he presented his report 'Our common future'. Sustainable development means that development that allows satisfying our present needs without spoiling the next generation capacity to meet their own needs. Any technology has both advantages and disadvantages; when considering the concept of sustainable development we have to take into account all the aspects, namely: - causes identification and review; - results evaluation; - corrective and preventive actions. Thus, ROMAG-PROD Heavy Water Plant has implemented a typical environment management system by means of what the general and specific objectives have been established, these objectives being stated in an Environment Policy Declaration: - Environment Management System as per SR EN ISO 14001/1997; - Quality Management System as per SR EN ISO 9001/2000; - IQNet- The International Certification Network. The paper presents the modern equipment for emissions and in-missions management with real time data transmission, for air and water as environment elements. Section two deals with trial of modern technology for industrial discharged wastewater treatment using the method of controlled batching of surface-active materials. Investigations on method application and laboratory testing as well as findings are given. As a conclusion, one can state that ROMAG-PROD Heavy Water Plant, has as one of its main concern keeping on high standards the safety of its equipment operation, sustainable development and risk eliminating so that neither environment or the population in vicinity is affected. (authors)

  7. Unsteady aspects of sodium-water reaction. Water clearing of sodium containing equipments

    International Nuclear Information System (INIS)

    Carnevali, Sofia

    2012-01-01

    Sodium fast Reactor (FSR) is one of the most promising nuclear reactor concepts in the frame of Generation IV Systems to be commercialised in the next decades. One important safety issue about this technology is the highly exothermal chemical reaction of sodium when brought in contact with liquid water. This situation is likely, in particular during decommissioning, when sodium needs to be firstly converted ('destroyed') into non-reactive species. This is achieved by water washing: the major products are then gaseous hydrogen and corrosive soda. Today, such operations are performed in confined chambers to mitigate the consequences of any possible abnormal conditions. It has for long been believed that the main safety problem was the combustion of hydrogen in the surrounding air despite some pioneering works suggested that even without air the reaction could be explosive. It is extremely important to clarify the phenomenology of sodium-water interactions since available knowledge does not allow a robust extrapolation of existing data/model to full scale plants. The primary objective of this work is to identify and assess the details of the phenomenology, especially at the sodium/water interface, to isolate the leading mechanisms and to propose a robust and innovative modelling approach. A large body of yet unreleased experimental data extracted from the files of the French Commissariat a l'Energie Atomique (CEA) was collated and analysed on the basis of 'explosion' physics. Some additional experiments were also performed to fill some gaps, especially about the kinetics of the reaction. The results strongly suggest that the fast expansion of gas producing a blast wave in certain conditions is a kind of vapour explosion. It also appears that any potential hydrogen-air explosion should be strongly mitigated by the large quantity of water vapour emanating also from the reaction zone. The limitations of existing modelling approaches are clearly

  8. The development of a subsea power transmission system for deep water boosting applications

    Energy Technology Data Exchange (ETDEWEB)

    Godinho, C.A.F. [Pirelli Cabos S.A. (Brazil); Campagnac, L.A. [Siemens S.A. (Brazil); Nicholson, A. [Tronic Electronics Services Ltd. (WEC); Magalhaes, W.M. de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    1996-12-31

    This paper presents the development of a sub sea power transmission in medium voltage and variable frequency, as a key system for application of Boosting technology and for electrical submersible Pumping in deep water wells. This work focuses on the design and manufacture of sub sea power cables and transformers for 1,000 m water depth. 8 refs., 6 figs.

  9. 14 CFR 135.165 - Communication and navigation equipment: Extended over-water or IFR operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment... PERSONS ON BOARD SUCH AIRCRAFT Aircraft and Equipment § 135.165 Communication and navigation equipment... aircraft used for IFR operations is equipped with at least— (i) One marker beacon receiver providing visual...

  10. Online estimation of wax deposition thickness in single-phase sub-sea pipelines based on acoustic chemometrics: A feasibility study

    OpenAIRE

    Halstensen, Maths; Arvoh, Benjamin Kaku; Amundsen, Lene; Hoffmann, Rainer

    2012-01-01

    Wax deposition in sub-sea oil producing pipelines is a concern to the oil producing companies. The deposition of wax in pipelines can cause serious economic implications if not monitored and controlled. Several researchers have developed models and investigated the deposition of wax in crude oil pipelines. As of today, there is no off the shelf instrument available for reliable online estimation of the wax depo- sition thickness in sub-sea pipelines. Acoustic chemometrics was applied to inves...

  11. Spectrophotometric determination of silica in water with Hach equipment; Determinacion espectrofotometrica de silicio en aguas con equipo Hach

    Energy Technology Data Exchange (ETDEWEB)

    Acosta L, E. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)]. e-mail: eal@nuclear.inin.mx

    1992-06-15

    The method for the determination of the silica element in water, demineralized water, raw waters, laundry waters, waters treated with ion exchange resins and sea waters using the indicated technique in the operation manual of the Hach equipment with a DR/3 spectrophotometer is described. This method covers the determination of the silica element in the interval from 0 to 1.5 mg/l on 50 ml. of base sample. These limits its can be variable if the size of the used aliquot one is changed for the final determination of the silica element. (Author)

  12. Outline of sodium-water reaction test in case of large leak with SWAT-3 testing equipments

    International Nuclear Information System (INIS)

    Sato, Minoru

    1978-01-01

    The key component in sodium-cooled fast reactors in steam generators, and the sodium-water reaction owing to the break of heating tubes may cause serious damages in equipments and pipings. The main factor controlling this phenomenon is the rate of leak of water. When the rate of water leak is small, the propagation of heating tube breaking may occur owing to ''wastage phenomenon'', on the other hand, when the rate of water leak is large, the phenomena of explosive pressure and flow occur due to the reaction heat and a large quantity of hydrogen generated by the reaction. In PNC, the testing equipments of SWAT-2 for small water leak and SWAT-1 for large leak were constructed, and the development test has been carried out to establish the method of safety design experimentally. The synthetic test equipment for the safety of steam generators, SWAT-3, was constructed to carry out the large water leak test in the scale close to actual plants. The object of the test, the outline of the test equipment, the phenomena of pressure and flow in the water injection test, the confirmation of the occurrence of secondary breaking of adjacent heating tubes, and the disposal of reaction products are described in this paper. This test is till going on, and the final conclusion will be reported later. (Kako, I.)

  13. Development of equipment for migration control of radioactive cesium absorbed in suspended solid in the river water

    International Nuclear Information System (INIS)

    Ohyama, Takuya; Ishikawa, Hiroyasu

    2015-01-01

    To prevent inflow of radiocesium with suspended solids (SS) into farmland and increase in dose rate of the river bank in the midstream and downstream, it is important to reduce SS in the river water; therefore we newly developed the test equipment using non-woven fabrics as a trapping material to capture and reduce the SS in running small river water. Authors installed this equipment into the small river which is located in mountainous area surrounded by forests where radionuclides released from the Fukushima Daiichi Nuclear Power Plant were deposited. Two turbidity gauges are installed in inflow and outflow point of this equipment and the turbidity has been continuously measured. From the result of a comparison of turbidity between inflow point and outflow point, a turbidity of inflow point is always higher than outflow point during ordinary water-level; this equipment can capture and reduce the SS in the river water. Through the analysis of particle size distribution, identification of minerals and measurement of concentration of radioactive Cs of the captured SS in the non-woven fabric should be carried out, to clarify the effectiveness of this equipment and non-woven fabrics for reducing the radioactive Cs in small rivers in the future. (author)

  14. Spectrophotometric determination of fluorides in water with Hach equipment; Determinacion espectrofotometrica de fluoruros en aguas con equipo Hach

    Energy Technology Data Exchange (ETDEWEB)

    Acosta L, E. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)]. e-mail: eal@nuclear.inin.mx

    1994-11-15

    The spectrophotometric method for the determination of the fluoride ion in water, demineralized water, raw waters, laundry waters and waters treated with ion exchange resins , using the technique and the SPADNS coloring indicated in the operation manual of the Hach equipment is described. This method covers the determination of the fluoride ion in the range from 0 to 2 mg/l on 25 ml. of radioactive base sample. These limits can be variable if the size of the used aliquot one is changed for the final determination of the fluoride ion. (Author)

  15. Screening analysis for EPACT-covered commercial HVAC and water-heating equipment

    Energy Technology Data Exchange (ETDEWEB)

    S Somasundaram; PR Armstrong; DB Belzer; SC Gaines; DL Hadley; S Katipumula; DL Smith; DW Winiarski

    2000-05-25

    EPCA requirements state that if the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE) amends efficiency levels prescribed in Standard 90.1-1989, then DOE must establish an amended uniform national manufacturing standard at the minimum level specified in amended Standard 90.1. However, DOE can establish higher efficiency levels if it can show through clear and convincing evidence that a higher efficiency level, that is technologically feasible and economically justified, would produce significant additional energy savings. On October 29, 1999, ASHRAE approved the amended Standard 90.1, which increases the minimum efficiency levels for some of the commercial heating, cooling, and water-heating equipment covered by EPCA 92. DOE asked Pacific Northwest National Laboratory (PNNL) to conduct a screening analysis to determine the energy-savings potential of the efficiency levels listed in Standard 90.1-1999. The analysis estimates the annual national energy consumption and the potential for energy savings that would result if the EPACT-covered products were required to meet these efficiency levels. The analysis also estimates additional energy-savings potential for the EPACT-covered products if they were to exceed the efficiency levels prescribed in Standard 90-1-1999. In addition, a simple life-cycle cost (LCC) analysis was performed for some alternative efficiency levels. This paper will describe the methodology, data assumptions, and results of the analysis. The magnitude of HVAC and SWH loads imposed on equipment depends on the building's physical and operational characteristics and prevailing climatic conditions. To address this variation in energy use, coil loads for 7 representative building types at 11 climate locations were estimated based on a whole-building simulation.

  16. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  17. Remote mechanized equipment for the repair and replacement of boiling water reactor recirculation loop piping

    International Nuclear Information System (INIS)

    Mauser, D.; Busch, D.F.

    1983-01-01

    Equipment has been assembled for the remote repair or replacement of boiling water reactor nuclear plant piping in the diameter range of 4 to 28 inches (10-71 cm). The objectives of this program were to produce high-quality pipe welds, reduce plant downtime, and reduce man-rem exposure. The repair strategy was to permit repair personnel to install and check out the repair subsystems and then leave the radiation zone allowing the operations to be conducted at a distance of up to 300 feet (91 m) from the operator. The complete repair system comprises subsystems for pipe severing, dimensional gaging, joint preparation, counterboring, welding, postweld nondestructive inspection (conceptual design), and audio, electronic, and visual monitoring of all operations. Components for all subsystems, excluding those for postweld nondestructive inspection, were purchased and modified as needed for integration into the repair system. Subsystems were designed for two sizes of Type 304 stainless steelpipe. For smaller, 12-inch-diameter (30.5 cm) pipe, severing is accomplished by a power hack saw and joint preparation and counterboring by an internally mounted lathe. The 22-inch-diameter (56 cm) pipe is severed, prepared, and counterbored using an externally mounted, single-point machining device. Dimensional gaging is performed to characterize the pipe geometry relative to a fixed external reference surface, allowing the placement of the joint preparation and the counterbore to be optimized. For both pipe sizes, a track-mounted gas tungsten-arc welding head with filler wire feed is used

  18. Reviews Equipment: Vibration detector Equipment: SPARK Science Learning System PS-2008 Equipment: Pelton wheel water turbine Book: Atomic: The First War of Physics and the Secret History of the Atom Bomb 1939-49 Book: Outliers: The Story of Success Book: T-Minus: The Race to the Moon Equipment: Fridge Rover Equipment: Red Tide School Spectrophotometer Web Watch

    Science.gov (United States)

    2010-03-01

    WE RECOMMEND Vibration detector SEP equipment measures minor tremors in the classroom SPARK Science Learning System PS-2008 Datalogger is easy to use and has lots of added possibilities Atomic: The First War of Physics and the Secret History of the Atom Bomb 1939-49 Book is crammed with the latest on the atom bomb T-Minus: The Race to the Moon Graphic novel depicts the politics as well as the science Fridge Rover Toy car can teach magnetics and energy, and is great fun Red Tide School Spectrophotometer Professional standard equipment for the classroom WORTH A LOOK Pelton wheel water turbine Classroom-sized version of the classic has advantages Outliers: The Story of Success Study of why maths is unpopular is relevant to physics teaching WEB WATCH IOP webcasts are improving but are still not as impressive as Jodrell Bank's Chromoscope website

  19. Improvements in Thermal Performance of Mango Hot-water Treatment Equipments: Data Analysis, Mathematical Modelling and Numerical-computational Simulation

    Directory of Open Access Journals (Sweden)

    Elder M. Mendoza Orbegoso

    2017-06-01

    Full Text Available Mango is one of the most popular and best paid tropical fruits in worldwide markets, its exportation is regulated within a phytosanitary quality control for killing the “fruit fly”. Thus, mangoes must be subject to hot-water treatment process that involves their immersion in hot water over a period of time. In this work, field measurements, analytical and simulation studies are developed on available hot-water treatment equipment called “Original” that only complies with United States phytosanitary protocols. These approaches are made to characterize the fluid-dynamic and thermal behaviours that occur during the mangoes’ hot-water treatment process. Then, analytical model and Computational fluid dynamics simulations are developed for designing new hot-water treatment equipment called “Hybrid” that simultaneously meets with both United States and Japan phytosanitary certifications. Comparisons of analytical results with data field measurements demonstrate that “Hybrid” equipment offers a better fluid-dynamic and thermal performance than “Original” ones.

  20. Suitability of electrolyzed oxidizing water for the disinfection of hard surfaces and equipment in radiology

    OpenAIRE

    Pintaric, Robert; Matela, Joze; Pintaric, Stefan

    2015-01-01

    Background Hospitals are faced with increasingly resistant strains of micro-organisms. When it comes to disinfection, individual parts of electronic equipment of angiology diagnostics such as patient couches of computer tomography (CT) and magnetic resonance imaging (MRI) scanners prove to be very hard to disinfect. Disinfectants of choice are therefore expected to possess properties such as rapid, residue-free action without any damaging effect on the sensitive electronic equipment. This pap...

  1. Study of the mechanical properties of welded joints by wet sub sea welding technique with tubular electrode; Estudo das propriedades mecanicas de juntas soldadas pela tecnica de soldagem subaquatica molhada com eletrodo tubular

    Energy Technology Data Exchange (ETDEWEB)

    Teichmann, Erwin Werner; Baixo, Carlos Eduardo Iconomos; Dutra, Jair Carlos [Santa Catarina Univ., Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica. Lab. de Soldagem e Mecatronica - LABSOLDA]. E-mail: erwin@labsolda.ufsc.br; Santos, Valter Rocha dos [Centro Federal de Educacao Tecnologica (CEFET), Rio de Janeiro, RJ (Brazil); Teixeira, Jose Claudio [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    1997-07-01

    Some experiments conducted at LABSOLDA/UFSC - a welding laboratory of Santa Catarina Univ., Florianopolis, Brazil - in order to identify mechanical properties, weld bead geometry and the quantity and dimensions of pores in weld beads produced by sub sea wet FCAW are described. Welding in shallow water with power source adjusted to operate in constant current characteristic mode and a set of parameters to establish an open arc transfer mode it was obtained weld beads with regular geometry and an acceptable profile, with low level of defects incidence, no pores and crack free. The tenacity measured by Charpy tests (0C) was 34 J and hardness of 119 HV-10 measured by Vickers tests. The methodology used in the experiments and the results obtained are discussed in the paper. (author)

  2. Procedure and equipment for the separation of isotopes for deuterium upgrading and for the production of heavy water

    International Nuclear Information System (INIS)

    Schoell, M.

    1981-01-01

    The invention concerns a simple procedure for the separation of isotopes for the enrichment of deuterium and for the production of heavy water as well as the equipment necessary for carrying out the process. Methane is conducted over bacterial cultures oxidizing methane to water and carbon dioxide. An enrichment of deuterium takes place in non-oxidized methane. The bacterial cultures are placed on carriers that are arranged in oxidation columns as baffle plates. Several oxidation towers of this kind can be arranged in series. (orig./RW) [de

  3. PWR type reactor equipped with a primary circuit loop water level gauge

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro.

    1990-01-01

    The time of lowering a water level to less than the position of high temperature side pipeway nozzle has been rather delayed because of the swelling of mixed water level due to heat generation of the reactor core. Further, there has been a certain restriction for the installation, maintenance and adjustment of a water level gauge since it is at a position under high radiation exposure. Then, a differential pressure type water level gauge with temperature compensation is disposed at a portion below a water level gauge of a pressurizer and between the steam generator exit plenum and the lower end of the loop seal. Further, a similar water level system is disposed to all of the loops of the primary circulation circuits. In a case that the amount of water contained in a reactor container should decreased upon occurrence of loss of coolant accidents caused by small rupture and stoppage of primary circuit pumps, lowering of the water level preceding to the lowering of the water level in the reactor core is detected to ensure the amount of water. Since they are disposed to all of the loops and ensure the excess margin, reliability for the detection of the amount of contained water can be improved by averaging time for the data of the water level and averaging the entire systems, even when there are vibrations in the fluid or pressure in the primary circuit. (N.H.)

  4. Evaporation equipment for the rational measurement of the radioactivity of water

    International Nuclear Information System (INIS)

    Hasenjager, H.

    1960-01-01

    An apparatus is described whereby the water can be evaporated directly in the radioactive sample holder in which the sample is counted. Rapid evaporation is obtained by the heating of the dish combined with the application of a jet of hot air. Liquid is added to the dish and the heating stopped automatically at the end of evaporation. The speed of evaporation and the Losses in activity as a function of the degree of heating were studied for various substances and different qualities of water (permuted water, tap water, rainwater). Complexones are added to avoid losses of activity. (author) [fr

  5. 24 CFR 203.52 - Acceptance of individual residential water purification equipment.

    Science.gov (United States)

    2010-04-01

    ... determined to meet local or state quality standards for drinking water. If neither state nor local standards... acceptable for human consumption. The notification to the mortgagor must identify specific contaminants in... maintaining. I undertstand that the individual water supply is unsafe for consumption unless the system is...

  6. Experimental study on split air conditioner with new hybrid equipment of energy storage and water heater all year round

    International Nuclear Information System (INIS)

    Wang Shaowei; Liu Zhenyan; Li Yuan; Zhao Keke; Wang Zhigang

    2005-01-01

    This paper presents a split air conditioner with a new hybrid equipment of energy storage and water heater all year round (ACWES). The authors made a special design on the storage tank to adjust the refrigerant capacity in the storage coils under different functions, instead of adding an accumulator to the system. An ACWES prototype, rebuilt from an original split air conditioner, has been finished, and experimental study of the operation processes of the prototype was done from which some important conclusions and suggestions have been made, which were helpful in the primary design and improvement of an ACWES system for potential users

  7. Method and equipment to extract and recover tritium from light and heavy water

    International Nuclear Information System (INIS)

    Butler, J.P.; Hammerli, M.M.

    1979-01-01

    A combined electrolysis-catalysis exchange process is proposed to extract tritium, with the aim of being able to reduce the tritium value in the heavy water moderation and cooling system of nuclear power plants. The tritium-contained water is brought into contact in a catalyst column in countercurrent with electrolytically produced hydrogen in this process, the hydrogen is then fed to a catalyst-containing separation column whilst the tritium-contained water flows to the electrolysis cell which produces the hydrogen gas. The process is described in detail. (UWI) [de

  8. A study on the establishment of component/equipment performance criteria considering Heavy Water Reactor characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Kwon, Young Chul; Lee, Min Kyu; Lee, Yun Soo [Sunmoon Univ., Asan (Korea, Republic of); Chang, Seong Hoong; Ryo, Chang Hyun [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of); Kim, Soong Pyung; Hwnag, Jung Rye; Chung, Chul Kee [Chosun Univ., Gwangju (Korea, Republic of)

    2002-03-15

    Foreign and domestic technology trends, regulatory requirements, design and researches for heavy water reactors are analyzed. Safety design guides of Canada industry and regulatory documents and consultative documents of Canada regulatory agency are reviewed. Applicability of MOST guidance 16 Revision 'guidance for technical criteria of nuclear reactor facility' is reviewed. Specific performance criteria are established for components and facilities for heavy water reactor.

  9. The development of portable equipment to study physical and chemical phases in natural waters

    International Nuclear Information System (INIS)

    Breward, N.; Peachey, D.

    1988-08-01

    A direct and relatively non-invasive method of measuring the speciation of dissolved metals in groundwaters has been developed. The equipment relies on a series of columns containing DAEA cellulose, cation exchange resin and anion exchange resin to extract sequentially and respectively colloids, cationic and anionic species. Organic colloids are eluted from the DAEA cellulose with dilute caustic soda while the inorganic colloids (Fe/Al oxyhydroxide phase) are stripped with dilute mineral acid. A further advantage of this scheme is the ability to concentrate the phases by at least a factor of ten. Applications to the groundwaters of the natural analogue sites currently under study by BGS will offer a means of validating thermodynamic databases used in modelling speciation of radionuclides such as uranium and thorium. (author)

  10. Optimization of power take-off equipment for an oscillating water column wave energy plant

    Energy Technology Data Exchange (ETDEWEB)

    Gato, L.M.C.; Falcao, Antonio de F.O. [Dept. de Engenharia Mecanica do IST, Lisboa (Portugal); Paulo Alexandre Justino [INETI/DER, Lisboa (Portugal)

    2005-07-01

    The paper reports the optimization study of the electro-mechanical power take-off equipment for the OWC plant whose structure is a caisson forming the head of the new Douro breakwater. The stochastic approach is employed to model the wave-to-wire energy conversion. The optimization includes rotational speed (for each sea state), turbine geometry and size, and generator rated power. The procedure is implemented into a fully integrated computer code, that yields numerical results for the multi-variable optimization process and for the electrical power output (annual average and for different sea states) with modest computing time (much less than if a time-domain model were used instead). Although focused into a particular real case, the paper is intended to outline a design method that can be applied to a wider class of wave energy converters.

  11. Method of removing tritium in exhaust water in a nuclear equipment

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, T

    1976-05-12

    A method is claimed to increase the efficiency of removing tritium from waste water through adsorption treatment. Steam is produced by heating waste water containing tritium, and it is passed through a tube filled with an adsorbent such as activated alumina, silica gel or zeolite. When a control limiting value is reached by the concentration of tritium within the steam, the flow of steam is stopped, and the adsorption tube is removed from the path of steam flow. Thereafter, another adsorption tube containing the afore-said adsorbent is provided in the steam flow path, and the steam is then allowed to flow again.

  12. Developing technique for waste water cleaning of a division for equipment decontamination

    International Nuclear Information System (INIS)

    Gromoglasov, A.A.; Solyakov, V.K.; Novikov, V.N.; Pil'shchikov, A.P.; Chekalov, A.G.; Sinyukov, M.A.; Pshenichnykh, V.N.

    1989-01-01

    Results are described of developing technique for radionuclide cleaning solutions after metal product decontamination. The method is based on the adagulation with usage of quicklime. The conclusion is method permits to consider it as the main technique for waste water decontamination. 3 refs.; 2 figs.; 3 tabs

  13. TiO2/water Nanofluid Heat Transfer in Heat Exchanger Equipped with Double Twisted-Tape Inserts

    Science.gov (United States)

    Eiamsa-ard, S.; Ketrain, R.; Chuwattanakul, V.

    2018-05-01

    Nowadays, heat transfer enhancement plays an important role in improving efficiency of heat transfer and thermal systems for numerous areas such as heat recovery processes, chemical reactors, air-conditioning/refrigeration system, food engineering, solar air/water heater, cooling of high power electronics etc. The present work presents the experimental results of the heat transfer enhancement of TiO2/water nanofluid in a heat exchanger tube fitted with double twisted tapes. The study covered twist ratios of twisted tapes (y/w) of 1.5, 2.0, and 2.5) while the concentration of the nanofluid was kept constant at 0.05% by volume. Observations show that heat transfer, friction loss and thermal performance increase as twist ratio (y/w) decreases. The use of the nanofluid in the tube equipped with the double twisted-tapes with the smallest twist ratio (y/w = 1.5) results in the increases of heat transfer rates and friction factor up to 224.8% and 8.98 times, respectively as compared to those of water. In addition, the experimental results performed that double twisted tapes induced dual swirling-flows which played an important role in improving fluid mixing and heat transfer enhancement. It is also observed that the TiO2/water nanofluid was responsible for low pressure loss behaviors.

  14. Redesigning transport equipment – comparative analysis of energy expenditure (power and water in refrigerators

    Directory of Open Access Journals (Sweden)

    Lisiane Ilha Librelotto

    2015-12-01

    Full Text Available Sustainability is defined as an approach that integrates social, economic and environmental concerns (SEE. This philosophy carries several implications for daily factory work, where culturally, the economic issue is considered most important. This paper provides a case study at a meat and bone-meal (MBM factory, and the preliminary studies of the adaptation of this factory to the SEE philosophy, focusing initially on economic aspect, and its relationship with the two other aspects. It also shows how the design of a conveyor belt - used to transport entrails and feathers from the slaughter site to the byproducts production site - could improve the consumption of power and water resources at the factory studied. Currently, this transport is accomplished manually (for feathers and by pneumatic conveying (for entrails. As a result, it was found that a change in the transport processes to align with the SEE philosophy would allow an 18% reduction of water use.

  15. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  16. Ultra sensitive sea water radioactivity monitoring system. Autonomous low power consumption equipped with wireless data communication

    International Nuclear Information System (INIS)

    Bonet, H.; Debauche, A.; Lellis, C. de; Adam, V.; Lacroix, J.P.; Put, P. van

    2003-01-01

    Following the recognition of their usefulness by the States and the scientific community, the automatic water monitoring networks were developed again to be able to measure sea water. For that purpose they had to be fully autonomous, have low power consumption (solar panels power supply), use wireless communicating (satellite, GSM, Radio) and be very sensitive (few Bq/m 3 ). It is important to note that radioactivity detection in sea has many constraints: The detection system sensitivity must be very high because of the dilution factor of the ocean. The analysis method has to be adapted: the detection of very low levels of artificial contamination is made difficult due to the natural radioactivity in seawater (i.e., more than 10 kBq of 40 K/m 3 ). The system has to be completely autonomous, 'wireless'. Additional conventional measuring probes must be connected to the system to increase its interest (pH, t deg, salinity, position, meteorology). The system maintenance must be very limited (1/year). Wind and corrosion resistance must be high. The probe must be installed on a buoy. Moreover, some improvements are needed to allow: Amplification Gain drifts due to NaI sensitivity to t deg to be compensated. Net peak area computation in a specific energy range. Interference correction to prevent false alarms due to natural radiation. Very long counting time. (author)

  17. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  18. CV equipment responsibilities

    CERN Document Server

    Pirollet, B

    2008-01-01

    This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. The various interfaces, providers and users of the water supply systems and clean water raising systems are described.

  19. THE INFLUENCE OF MONK EQUIPPED PONDS ON THE QUALITY OF BASIN HEAD STREAMS, THE EXAMPLE OF WATER TEMPERATURE IN LIMOUSIN AND BERRY (FRANCE

    Directory of Open Access Journals (Sweden)

    Laurent TOUCHART

    2010-12-01

    Full Text Available In the centre-west regions of France, the deep water outlet system known as a “monk” is used in 13% of bodies of water. The authorities are strongly encouraging this to increase, arguing that this system would reduce pond induced warming of the hydrographical network. We have measured the water temperature in four monk equipped ponds for 13 years to such an extent that this paper draws on an analysis of 142,200 original measurements. Compared to a surface outflow, a monk is a system which shifts the warming of the emissary water course to the end of summer and the autumn which reduces average annual warming by about 1°C. This reduces the heating of diurnal maxima but increases warming of the minima. A monk equipped pond warms the river with deep water which has acquired its heat by mechanical convection generated by the wind, as opposed to a weir equipped pond which provides surface water warmed by insolation. In winter the monk equipped pond does not damage the thermal living conditions for Fario trout embryos and larvae under the gravel. In summer, the monk prevents night time cooling of the emissary and increases the temperature of the minima excessively for sensitive species.

  20. A remote and autonomous continuous monitoring ultrasonic system for flood detection in sub-sea members of offshore steel oil rigs

    Energy Technology Data Exchange (ETDEWEB)

    Mijarez-Castro, Rito

    2006-07-01

    This thesis presents a novel and autonomous continuous monitoring system for flood detection in the hollow sub-sea members of offshore steel oil rigs. The technique offers an alternative to underwater nondestructive testing methods based on ultrasound and x-rays, which have been used to detect the presence of seawater in these applications, often with divers or remote operating vehicles. The research consists of theoretical and experimental work necessary for the development of an integral system that can be used in new fixed offshore oil rig designs. The system employs a single piezoelectric transducer which can be permanently attached to the inner wall of every sub-sea structure and which is powered by a normally inert seawater battery. Upon activation, the sensor transmits ultrasonic chirp or tone encoded pulses in the range of 21 k Hz to 42 k Hz, to a monitoring system at deck level for decoding and identifying flooded members. Two approaches to the system were considered during the investigation, depending on the communication channel exploited. These were based on either using the seawater as a propagation medium or using the steel structure as a wave-guide. A system based on theoretical models was built and field experiments were conducted using a purpose built jointed steel pipe structure, 7 m in length, 0.5 m in diameter and 16 mm in thickness. This structure was flooded by complete immersion in seawater. Results obtained using water as communication medium and a frequency in the order of 38 k Hz yielded an attenuation figure of 0.4 d B m{sub -}1 over 100 m, since losses were predominantly geometric. In contrast, using the tubular structure as a wave-guide and axis symmetric guided waves as the excitation, a gross attenuation figure of 1.3 d B m{sub -}1 was attained. In the straight parts of the structure, the attenuation ranged from 0.3 d B m{sub -} 1 to 0.6 d B m{sub -}1. The modes most likely to have been excited within the structure were L(0,5) - L(0

  1. Method for removing hydrogen sulphide from oil-containing water and equipment therefore; Fremgangsmaate for aa fjerne hydrogensulfid fra oljeholdig vann

    Energy Technology Data Exchange (ETDEWEB)

    Hoeyvik, H; Hovland, J; Eskilt, J P

    1995-02-27

    The invention relates to an method for removing hydrogen sulphide (H{sub 2}S) from oil-containing water and equipment therefore. Oil-containing water and nitrate is conducted through a bioreactor to remove H{sub 2}S. Nitrate is added to the oil-containing water in a dose ratio (sulphide:nitrate) of 1:10 to 1:40. The retention time in the reactor tank is for 10-60 minutes. After this treatment, purified water, where >90% of the H{sub 2}S-amount is removed, is let out of the tank. The equipment for performing the above mentioned method, is based on a bioreactor having large density of denitrifying bacteria. The reactor tank, is filled with carrying material providing large contact area. Even distribution of oil-containing water and nitrate over the carrying material which already may be covered by septic mud, forms an active sulphide oxidizing biofilm having large surface. This biofilm makes an extremely effective equipment for removing sulphide from oil-containing water. 3 figs.

  2. Production equipment development needs for a 700 metric ton/year light water reactor mixed oxide fuel manufacturing plant

    International Nuclear Information System (INIS)

    Blahnik, D.E.

    1977-09-01

    A literature search and survey of fuel suppliers was conducted to determine how much development of production equipment is needed for a 700 metric tons/y LWR mixed-oxide (UO 2 --PuO 2 ) fuel fabrication plant. Results indicate that moderate to major production equipment development is needed in the powder and pellet processing areas. The equipment in the rod and assembly processing areas need only minor development effort. Required equipment development for a 700 MT/y plant is not anticipated to delay startup of the plant. The development, whether major or minor, can be done well within the time frame for licensing and construction of the plant as long as conventional production equipment is used

  3. Construction of a model of the process of accumulation of radionuclides of corrosion products on the equipment in nuclear power plants with boiling-water reactors

    International Nuclear Information System (INIS)

    Tevlin, S.A.

    1985-01-01

    This paper addresses the problem of corrosion of the structural materials of the reactor loop. This problem can be solved by constructing physical models of the process of accumulation of radionuclides on the equipment at nuclear power plants and by constructing the analytical apparatus for describing them. These models are presented here, and allow the analyzing of the effect of separate states and thermophysical factors, determination of the basic factors, and the ability to foresee in timely fashion the water state and structural measures required to lower the rate of growth and to decrease the amount of radionuclides deposited on the equipment in the nuclear power plant

  4. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  5. Oil alarm. Equipment and techniques for fire brigades for combatting spills of ground water pollutants. 3. rev. ed.

    International Nuclear Information System (INIS)

    Plattner, H.P.

    1993-01-01

    The little red book discusses liquid and liquefying substances that present a groundwater hazard, their occurrence, the hazards of spills, and the equipment and techniques required for combatting them. (orig.) [de

  6. Procedure for qualification of electric equipment installed in containments for pressurized water reactors subject to accident conditions

    International Nuclear Information System (INIS)

    1991-11-01

    This generic norm is usable for electrical equipment installed in containment building of PWR subject to accidental conditions. She defines the qualification methods and the general rules usable for the test specifications of qualification for these materials

  7. ITER's Tokamak Cooling Water System and the the Use of ASME Codes to Comply with French Regulations of Nuclear Pressure Equipment

    International Nuclear Information System (INIS)

    Berry, Jan; Ferrada, Juan J.; Curd, Warren; Dell Orco, Giovanni; Barabash, Vladimir; Kim, Seokho H.

    2011-01-01

    During inductive plasma operation of ITER, fusion power will reach 500 MW with an energy multiplication factor of 10. The heat will be transferred by the Tokamak Cooling Water System (TCWS) to the environment using the secondary cooling system. Plasma operations are inherently safe even under the most severe postulated accident condition a large, in-vessel break that results in a loss-of-coolant accident. A functioning cooling water system is not required to ensure safe shutdown. Even though ITER is inherently safe, TCWS equipment (e.g., heat exchangers, piping, pressurizers) are classified as safety important components. This is because the water is predicted to contain low-levels of radionuclides (e.g., activated corrosion products, tritium) with activity levels high enough to require the design of components to be in accordance with French regulations for nuclear pressure equipment, i.e., the French Order dated 12 December 2005 (ESPN). ESPN has extended the practical application of the methodology established by the Pressure Equipment Directive (97/23/EC) to nuclear pressure equipment, under French Decree 99-1046 dated 13 December 1999, and Order dated 21 December 1999 (ESP). ASME codes and supplementary analyses (e.g., Failure Modes and Effects Analysis) will be used to demonstrate that the TCWS equipment meets these essential safety requirements. TCWS is being designed to provide not only cooling, with a capacity of approximately 1 GW energy removal, but also elevated temperature baking of first-wall/blanket, vacuum vessel, and divertor. Additional TCWS functions include chemical control of water, draining and drying for maintenance, and facilitation of leak detection/localization. The TCWS interfaces with the majority of ITER systems, including the secondary cooling system. U.S. ITER is responsible for design, engineering, and procurement of the TCWS with industry support from an Engineering Services Organization (ESO) (AREVA Federal Services, with support

  8. Comparing Methods of Separating Bacterial Biofilms on the Surface of Water Transportation Pipes and Equipment of Milking in the Farms

    Directory of Open Access Journals (Sweden)

    setareh nabizadeh

    2016-08-01

    Full Text Available Introduction Bacterial biofilms can be both useful and harmful based on their combination and locations. Biofilm formation occurs as a stepwise process. Their formation in liquid transportation pipes used for milking system and drinking water in animal farms may create some problems and is a potential source of pollution. Speed of biofilm formation depends on many factors including: construction and functional characteristics of bacteria, the composition and culture conditions such as temperature and substratum. In this research the Bacillus subtillis bacteria with special characteristics was selected due to its capability for biofilm creation. Bacillus subtillis bacteria is mobility and a stronger connection than other bacteria levels are created. In the research conducted in the biofilm there are many resources on biofilm formation by Bacillus subtillis bacteria. Bacillus subtillis is saprophytic in the soil, water and air. There is also the ability to form spores of Bacillus subtillis. Materials and Methods Firstly the possibility of creating biofilms on different Plastic (polyvinilchlorid, polypropylene, polyethylengelycole, alluminum and glass surfaces in three temperatures of 4°C, 30°C and 37°C were studied. Two different methods of biofilms separation including separating swap and vortex were tested and their efficienceies were calculated. After biofilm formation on parts of the vortex separation method after washing parts in sterile conditions in a tube containing normal saline for 4 minutes was vortex. The bacterial suspension decreasing dilution series was created. Pour plate in medium using agar plate count agar and was cultured at 30°C for 24-48 hours. Numbers of colonies were counted. The numbers of biofilm cells were calculated. In swap method after biofilm formation on parts using a cotton swap was isolated biofilms. The swap was transferred to tube containing normal saline and the bacterial suspension decreasing dilution

  9. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  10. [A novel vapor dynamic headspace enrichment equipment for nontarget screening of volatile organic compounds in drinking water].

    Science.gov (United States)

    Ma, Huilian; Zhang, Haijun; Tian, Yuzeng; Wang, Longxing; Chen, Jiping

    2011-09-01

    A novel vapor dynamic headspace enrichment device was set up for nontarget screening of volatile organic compounds (VOCs) in drinking water. The main operating parameters of this device, such as length of distillation tube, volume of collected condensate, and choice of absorbent, were optimized. In this device, vapor was utilized as a purge gas and water was utilized as a absorbent. With the help of the device, one liter of water sample could be concentrated to 5 mL and the sensitivity of traditional purge and trap-gas chromatography-mass spectrometry (P&T-GC-MS) could be improved 1-2 orders of magnitude. Source and disinfected water samples from a water treatment plant were analyzed with this method. Compared with the traditional P&T-GC-MS analysis without pre-enrichment, the numbers of identified VOCs were improved from 0 to 16 for source water and 5 to 35 for disinfected water samples. It is also shown that there are many halide compounds in VOCs in disinfected water which do not exist in source water.

  11. Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study #11: Commercial Kitchen Equipment (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2011-09-01

    The Exchange, formerly the Army and Air Force Exchange Service (AAFES), is a joint military activity and the U.S. Department of Defense?s (DOD) oldest and largest retailer. The Exchange is taking a leadership role in water efficiency improvements in their commercial kitchens by integrating water efficiency concepts into the organization?s overall sustainability plan and objectives.

  12. Twenty-third water reactor safety information meeting. Volume 3, structural and seismic engineering, primary systems integrity, equipment operability and aging, ECCS strainer blockage research and regulatory issues

    Energy Technology Data Exchange (ETDEWEB)

    Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1996-03-01

    This three-volume report contains papers presented at the Twenty- Third Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, October 23-25, 1995. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Italy, Japan, Norway, Russia, Sweden, and Switzerland. This document, Volume 3, presents topics in Structural & Seismic Engineering, Primary Systems Integrity, Equipment Operability and Aging, and ECCS Strainer Blockage Research & Regulatory Issues. Individual papers have been cataloged separately.

  13. Extension and update of the reliability data for fire protection equipment in German light water reactors; Ergaenzung und Aktualisierung von Zuverlaessigkeitskenngroessen fuer Brandschutzeinrichtungen in deutschen Leichtwasserreaktoren

    Energy Technology Data Exchange (ETDEWEB)

    Forell, Burkhard; Einarsson, Svante

    2016-12-15

    Within the BMUB project 3610R01370 ''Extension and update of reliability data for fire protection equipment in German light water reactors'' plant-specific as well as generic failure rates for the technical reliability of active fire protection features in German nuclear power plants have been calculated. Based on results of previous projects, in this project observation times of components were updated and extended and additional components and functions were assessed. Now, the data evaluated results from a total of six German reference plants with seven reactor units.

  14. Twenty-third water reactor safety information meeting. Volume 3, structural and seismic engineering, primary systems integrity, equipment operability and aging, ECCS strainer blockage research and regulatory issues

    International Nuclear Information System (INIS)

    Monteleone, S.

    1996-03-01

    This three-volume report contains papers presented at the Twenty- Third Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, October 23-25, 1995. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Italy, Japan, Norway, Russia, Sweden, and Switzerland. This document, Volume 3, presents topics in Structural ampersand Seismic Engineering, Primary Systems Integrity, Equipment Operability and Aging, and ECCS Strainer Blockage Research ampersand Regulatory Issues. Individual papers have been cataloged separately

  15. The development of a remote repair system for deep water pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Frazer, Ian; Giles, John [Stolt Offshore MS Ltd., Aberdeen (United Kingdom)

    2000-07-01

    The ability to maintain a high level of flexibility within the contingency plans for sub sea pipeline repair is a critical issue normally achieved by basing the repair plans on diver intervention. This allows the pipeline operator flexibility to respond to particular repair situations as they occur, minimize up front planning and optimize the investment in repair equipment and stock. However for deep water pipelines all intervention must be performed by remote methods, which require the development of suitable equipment and more detailed repair procedures. This paper describes the development of a remotely operated pipeline repair system capable of working down to 3000 m and allowing a relatively high level of flexibility with minimum investment in repair stock. The repair system is based upon the Modular Advanced Tie-In System (MATIS) which has been successfully developed for the tie-in of deep water flow lines. The MATIS repair system is based on the use of standard flanges to replace a damaged section of pipe with a spool piece in a similar manner to a hyperbaric welded repair. Various repair scenarios are discussed in the paper together with the equipment and the procedures used to perform the repair. The paper will also discuss the other remote repair options such as hot tapping and friction stitch welding. (author)

  16. Several perspectives on water-chemical cycles for nuclear power stations equipped with type VVER and RBMK reactors

    International Nuclear Information System (INIS)

    Mamet, A.P.; Mamet, V.A.; Pashevich, V.I.; Nazarenko, P.N.

    1982-01-01

    Water-chemical cycles for loops I and II of VVER reactors are discussed. These cycles are mixed ammonia-sodium with a variable concentration of boric acid and ammonia hydrazine with a pH factor of 9.1 +/- 0.1. New water-chemical cycles are considered for use in both existing and new nuclear power plants. Application of these new water-chemical cycles showed produce a significant improvement in operating conditions of nuclear power plants. Upon accumulation of sufficient operating experience with these cycles, it should be possible to raise the issue of revising applicable standard documentation

  17. The oxidation of stainless steels in water vapour-oxygen mixtures. Design and development of an original equipment

    International Nuclear Information System (INIS)

    Uller, Leonardo.

    1981-02-01

    A device including a thermobalance placed in a tight housing has been conceived and built. This apparatus is suitable to submit metallic samples to the action of dry oxygen, deoxygenated water vapour or mixtures of water vapour and oxygen. The first results obtained with this device, at 600 0 C, and for a 18-10 stainless steel are: - in the presence of deoxygenated water vapour, one observes very fast oxidation kinetics, with a roughly parabolic law (K approximately equal to 3x10 -2 mg 2 .cm -4 .h -1 ); - the addition of oxygen from about 10 vpm onwards, induces an important initial slowing down of the kinetics; - the duration of this 'induction' period rises with increasing the oxygen content of the water vapour, but the protection of the alloy due to the action of oxygen remains temporary; - in another way, experiments begun with water vapour, were continued with pure oxygen, and reciprocally. During these 'mixed' experiments, the weight increases were continually recorded. A swift slowing down has been observed in the first case and an important acceleration in the second one [fr

  18. Assessment of Equipment for the Determination of Nutrients in Marine Waters: A Case Study of the Microplate Technique

    Science.gov (United States)

    Aminot, A.

    1996-09-01

    An essential prerequisite for quality assurance of the colorimetric determination of nutrients in seawater is the use of suitable photometric equipment. Based on a knowledge of the optical characteristics of a particular system and the absorption coefficient of the analyte, a statistical approach can be used to predict the limit of detection and the limit of quantitation for a given determinand. The microplate technique, widely used for bioassays, is applicable to colorimetric analysis in general, and its use for the determination of nutrients in seawater has been suggested. This paper reports a theoretical assessment of its capabilities in this context and a practical check on its performance, taking the determination of nitrite in seawater as typical. The conclusion is that short optical path length and insufficient repeatability of the absorbance measurement render it unsuitable for the determination of the low concentrations generally encountered in marine work, with the possible exception of nitrate. The perceived advantage of high-speed analysis is a secondary consideration in the overall process of determining nutrients, and the microplate technique's small scale of operation is a definite disadvantage as this increases the risk of exposure to contamination problems, in comparison with conventional techniques.

  19. On-line characterization of emulsions aiming equipment sizing and definition of primary processing conditions; Caracterizacao em tempo real de emulsoes visando o dimensionamento de equipamentos e a definicao das condicoes de processamento primario

    Energy Technology Data Exchange (ETDEWEB)

    Lucas, Gloria M.S. [Fundacao Gorceix, Ouro Preto, MG (Brazil); Oliveira, Roberto C.G. de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    In this work are presented the results of the test of emulsion generation, carried out in the Experimental Nucleus of PETROBRAS in Atalaia city Brazil, in which equipment for on-line measurement of droplet size distribution was tested, whose operation principle is of acoustic attenuation. One of the objectives of this study was the validation of this technology for on-line characterization of petroleum emulsions, aiming at the optimization of the sub sea or top side processing equipment. The emulsions had been on-line monitored by the acoustic spectrometer, installed downstream of a choke valve. Samples of generated emulsions had been collected in different points of the circuit and characterized off-line how much its stability, droplet size distribution (DSD), water cut and viscosity. Moreover, in some stages of the test a demulsifier was injected so as to verify the behavior of emulsions. The acoustic spectrometry technique demonstrated to be efficient in the on-line characterization of the droplet size distributions of emulsions generated in different operational conditions. The acoustic technique presented satisfactory performance, in view of the comparison of the values of median gotten on-line and off-line. (author)

  20. The structural design of the experimental equipment for unconventional heating water using heat transfer surfaces located in the heat source

    Directory of Open Access Journals (Sweden)

    Jandačka J.

    2013-04-01

    Full Text Available Flue gas temperature at throat of most industrially produced fireplaces is around 250 to 350 °C. It's quite interesting thermal potential, which can be even before sucking up the chimney back utilize. One of the potential uses of this device to heat the hot water. Article refers to the structural design of such a device, which works with the transfer of heat through a substance changes phase from liquid to steam in a sealed tube (heat pipe. Benefits of heat pipes is their light weight, the thermal effect of a rapid and low maintenance costs.

  1. The structural design of the experimental equipment for unconventional heating water using heat transfer surfaces located in the heat source

    Science.gov (United States)

    Kaduchová, K.; Lenhard, R.; Gavlas, S.; Jandačka, J.

    2013-04-01

    Flue gas temperature at throat of most industrially produced fireplaces is around 250 to 350 °C. It's quite interesting thermal potential, which can be even before sucking up the chimney back utilize. One of the potential uses of this device to heat the hot water. Article refers to the structural design of such a device, which works with the transfer of heat through a substance changes phase from liquid to steam in a sealed tube (heat pipe). Benefits of heat pipes is their light weight, the thermal effect of a rapid and low maintenance costs.

  2. Equipment for secondary water distribution in heat exchanger, especially saturated steam generator for nuclear power plants and heat plants

    Energy Technology Data Exchange (ETDEWEB)

    Riman, J; Manek, O; Rybnicek, J

    1979-09-15

    A special structure consisting of a system of channels and a distribution plate with ports in-built above the tube-plate of a vertical-type steam generator prevents secondary water vaporization in the space above the tube-plate and thus also salt and sludge sedimentation which causes increased corrosion of heat transfer tubes. The size of the distribution plate ports is variable in the radial direction. The distribution plate is divided by means of the system of channels into at least two parts. The middle section of each part is of the through-flow type.

  3. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  4. Cryogenic equipment

    International Nuclear Information System (INIS)

    Leger, L.; Javellaud, J.; Caro, C.; Gilguy, R.; Testard, O.

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [fr

  5. Mathematical Modeling of Fluid Flow in a Water Physical Model of an Aluminum Degassing Ladle Equipped with an Impeller-Injector

    Science.gov (United States)

    Gómez, Eudoxio Ramos; Zenit, Roberto; Rivera, Carlos González; Trápaga, Gerardo; Ramírez-Argáez, Marco A.

    2013-04-01

    In this work, a 3D numerical simulation using a Euler-Euler-based model implemented into a commercial CFD code was used to simulate fluid flow and turbulence structure in a water physical model of an aluminum ladle equipped with an impeller for degassing treatment. The effect of critical process parameters such as rotor speed, gas flow rate, and the point of gas injection (conventional injection through the shaft vs a novel injection through the bottom of the ladle) on the fluid flow and vortex formation was analyzed with this model. The commercial CFD code PHOENICS 3.4 was used to solve all conservation equations governing the process for this two-phase fluid flow system. The mathematical model was reasonably well validated against experimentally measured liquid velocity and vortex sizes in a water physical model built specifically for this investigation. From the results, it was concluded that the angular speed of the impeller is the most important parameter in promoting better stirred baths and creating smaller and better distributed bubbles in the liquid. The pumping effect of the impeller is increased as the impeller rotation speed increases. Gas flow rate is detrimental to bath stirring and diminishes the pumping effect of the impeller. Finally, although the injection point was the least significant variable, it was found that the "novel" injection improves stirring in the ladle.

  6. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  7. Selection and use of fire-resistant hydraulic fluids for underground mining equipment. [Oil-in-water emulsions; water-in-oil emulsions; phosphate esters; chlorinated hydrocarbons

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, A J

    1981-02-01

    During the initial introduction of fire-resistant fluids to the Canadian underground mining industry, all hydraulic systems for which they were being considered were originally designed for operation with mineral oil. This meant that each system had to be individually examined and assessed with regard to its suitability in terms of acceptable component life and operation, at the same time as the selection of a fluid was being undertaken. Fluid selection by cost differential, toxicity content and fire resistancy was narrowed to types HFB and HFC, with HFB water-in-oil emulsion being the preferred fluid based on performance characteristics. By incorporating British mining industry experience and superior fluid types with practical trials, it was found that by modifing the design of some systems and slightly derating the operational parameters of individual components, it was possible to obtain a system performance comparable to that obtained when mineral oil was being used.

  8. Water Supply and Treatment Equipment

    Science.gov (United States)

    2009-09-15

    j. Results of physical inspection and record of any repair or maintenance accomplished to restore the system to a fully functional state...for the specific membrane; b. For technologies employing membrane ultrafiltration and/or membrane microfiltration , identification of the

  9. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  10. Automatic Web-Based, Radio-Network System To Monitor And Control Equipment For Investigating Gas Flux At Water - Air Interfaces

    Science.gov (United States)

    Duc, N. T.; Silverstein, S.; Wik, M.; Beckman, P.; Crill, P. M.; Bastviken, D.; Varner, R. K.

    2015-12-01

    Aquatic ecosystems are major sources of greenhouse gases (GHG). Robust measurements of natural GHG emissions are vital for evaluating regional to global carbon budgets and for assessing climate feedbacks on natural emissions to improve climate models. Diffusive and ebullitive (bubble) transport are two major pathways of gas release from surface waters. To capture the high temporal variability of these fluxes in a well-defined footprint, we designed and built an inexpensive automatic device that includes an easily mobile diffusive flux chamber and a bubble counter, all in one. Besides a function of automatically collecting gas samples for subsequent various analyses in the laboratory, this device utilizes low cost CO2 sensor (SenseAir, Sweden) and CH4 sensor (Figaro, Japan) to measure GHG fluxes. To measure the spatial variability of emissions, each of the devices is equipped with an XBee module to enable a local radio communication DigiMesh network for time synchronization and data readout at a server-controller station on the lakeshore. Software of this server-controller is operated on a low cost Raspberry Pi computer which has a 3G connection for remote monitoring - controlling functions from anywhere in the world. From field studies in Abisko, Sweden in summer 2014 and 2015, the system has resulted in measurements of GHG fluxes comparable to manual methods. In addition, the deployments have shown the advantage of a low cost automatic network system to study GHG fluxes on lakes in remote locations.

  11. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  12. Heat transfer enhancement of TiO2/water nanofluid in a heat exchanger tube equipped with overlapped dual twisted-tapes

    Directory of Open Access Journals (Sweden)

    S. Eiamsa-ard

    2015-09-01

    Full Text Available Titanium dioxide (TiO2 in water as nanofluid was employed for heat transfer enhancement together with overlapped dual twisted tapes (O-DTs. The study encompassed Reynolds numbers from 5400 to 15,200, O-DTs with overlapped twist ratios (yo/y of 1.5, 2.0 and 2.5 and nanofluids with TiO2 volume concentrations (ϕ of 0.07%, 0.14% and 0.21%. The experimental and numerical results indicated that O-DTs with smaller overlapped twisted ratio delivered a stronger swirl intensity and higher turbulent kinetic energy (TKE. The use of O-DTs at the smallest overlapped twist ratio of 1.5 enhanced heat transfer rates up to 89%, friction factor by 5.43 times and thermal performance up to 1.13 times as compared to those of plain tube. In addition, heat transfer increased as TiO2 volume concentration of nanofluid increased, owing to the increases of contact surface and thermal conductivity. The simultaneous use of the O-DTs having twist ratios 1.5 with the nanofluid with TiO2 volume concentration of 0.21% resulted in heat transfer enhancement around 9.9–11.2% and thermal performance improvement up to 4.5% as compared to the use of O-DTs alone. The empirical correlations of heat transfer rate (Nu, friction factor (f and thermal performance (η in a constant wall heat flux tube equipped O-DTs at different overlapped twist ratios (yo/y and volume concentrations of TiO2 nanoparticles (ϕ are also reported for heat transfer applications.

  13. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  14. Calculational experimental examination and ensuring of equipment and pipelines seismic resistance at starting and operating water-cooled and moderated reactor WWER-type NPPs. Final report

    International Nuclear Information System (INIS)

    1999-01-01

    The results of testing of equipment at Bohunice NPP and pipeline systems at Unit 3 of Kozloduy NPP (WWER-440 type reactors) are presented in this Final Report. These results side by side with experimental values of natural frequencies and decrements also include experimental data about vibration modes of tested equipment and pipelines. For the first time the results of new calculational-experimental examination of equipment seismic resistance at Unit 2 of Armenian NPP are presented. At Kozloduy NPP direction's request the planed additional tests of some selected items were put off on 1997. Instead of postponed tests we carried out detailed analysis of our past inspections of numerous equipment seismic resistance at the Unit 5 of Kozloduy NPP. Experimental data with results of additional analysis are presented

  15. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  16. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  17. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  18. Building technical services - Compact equipment for heating, hot water preparation, ventilation and cooling - Final report; Haustechnik - Kompaktgeraete (Heizen, Warmwasser, Lueften, Kuehlen - alles aus einem). Erkenntnisse aus der Praxis - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Haessig, W.; Streit, S. [Haessig Sustech GmbH, Uster (Switzerland); Helfenfinger, D.; Keller, P. [Hochschule fuer Technik und Architektur Luzern (HSLU), Luzern (Switzerland)

    2009-06-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents and discusses the knowledge gained in practice concerning compact equipment that can be used for heating, hot water preparation, ventilation and cooling. Such units combine heat-pumps and the further equipment necessary. Data on various factors were collected over a period of one year in three apartment blocks that meet Swiss Minergie-P very low energy consumption standards. Apart from the above mentioned factors, the study also considered humidity and carbon dioxide levels in the apartments and inhabitant behaviour. The authors note that the energy consumption of several apartments fell below the Minergie-P limiting, annual value of 30 kWh/m2. An increase in electricity consumption dependent on room temperatures is noted and commented on. The economic feasibility of Minergie-P and so-called passive housing is commented on.

  19. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  20. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  1. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  2. Some perspective decisions for the regeneration system equipment of the thermal and nuclear power plants decreasing the probability of water ingress into the turbine and rotor acceleration by return steam flow

    Science.gov (United States)

    Trifonov, N. N.; Svyatkin, F. A.; Sintsova, T. G.; Ukhanova, M. G.; Yesin, S. B.; Nikolayenkova, E. K.; Yurchenko, A. Yu.; Grigorieva, E. B.

    2016-03-01

    The regeneration system heaters are one of the sources of possible ingress of the water into the turbine. The water penetrates into the turbine either at the heaters overflow or with the return flow of steam generated when the water being in the heater boils up in the dynamic operation modes or at deenergization of the power-generating unit. The return flow of steam and water is dangerous to the turbine blades and can result in the rotor acceleration. The known protective devices used to prevent the overflow of the low-pressure and high-pressure heaters (LPH and HPH), of the horizontal and vertical heaters of heating-system water (HWH and VWH), as well as of the deaerators and low-pressure mixing heaters (LPMH) were considered. The main protective methods of the steam and water return flows supplied by the heaters in dynamic operation modes or at deenergization of the power-generating unit are described. Previous operating experience shows that the available protections do not fully prevent water ingress into the turbine and the rotor acceleration and, therefore, the development of measures to decrease the possibility of ingress of the water into the turbine is an actual problem. The measures allowing eliminating or reducing the water mass in the heaters are expounded; some of them were designed by the specialists of OAO Polzunov Scientific and Development Association on Research and Design of Power Equipment (NPO CKTI) and are efficiently introduced at heat power plants and nuclear power plants. The suggested technical solutions allow reducing the possibility of the water ingress into the turbine and rotor acceleration by return steam flow in the dynamic operation modes or in the case of power generating unit deenergization. Some of these solutions have been tested in experimental-industrial exploitation and can be used in industry.

  3. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  4. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  5. Current Status and Management of Hand Pump Equipped Water Facilities in Blantyre Rural District, Malawi : Case Study of Kapeni and Lundu Traditional Authorities

    OpenAIRE

    Njalam'mano, John Bright Joseph

    2007-01-01

    Although the access to adequate safe drinking water is taken for granted in developed countries and urban settlements in some developing countries at the end of 2002 it was estimated that globally, some 1.1 billion people still rely on unsafe drinking water sources particularly in the developing regions of India and Africa. Malawi is one of the developing countries located in the arid-semiarid Sub-Saharan African region with only 62% of its people having access to safe drinking water. Borehol...

  6. An overview of latest deep water technologies

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The 8th Deep Offshore Technology Conference (DOT VIII, Rio de Janeiro, October 30 - November 3, 1995) has brought together renowned specialists in deep water development projects, as well as managers from oil companies and engineering/service companies to discuss state-of-the-art technologies and ongoing projects in the deep offshore. This paper is a compilation of the session summaries about sub sea technologies, mooring and dynamic positioning, floaters (Tension Leg Platforms (TLP) and Floating Production Storage and Off loading (FPSO)), pipelines and risers, exploration and drilling, and other deep water techniques. (J.S.)

  7. Remote handling equipment for SNS

    International Nuclear Information System (INIS)

    Poulten, B.H.

    1983-01-01

    This report gives information on the areas of the SNS, facility which become highly radioactive preventing hands-on maintenance. Levels of activity are sufficiently high in the Target Station Area of the SNS, especially under fault conditions, to warrant reactor technology to be used in the design of the water, drainage and ventilation systems. These problems, together with the type of remote handling equipment required in the SNS, are discussed

  8. Development of DP (Dynamic Positioning) to pull-in sub sea pipelines; Utilizacao de barcos de manuseio de ancoras operando com DP (Dynamic Positioning) para arraste de dutos submarinos

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Manoel H.S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Galgoul, Elton C. [Suporte Engenharia, Luziania, GO (Brazil)

    2004-07-01

    Sub sea pipeline construction at oil and gas fields, with high concentration of on-bottom facilities, becomes more difficult when mooring operations and pipeline approach to a congested platform have to be performed. One method that has often been applied in Brazil is the so-called 'DP (Dynamic Positioning) pull-in', where PETROBRAS owned pipelay Barge, BGL-1, is moored away from the congested area, while a DP anchor handler pulls the rigid pipeline from BGL-1 to a target near the platform. The method was conceived to avoid mooring operations near the congested platforms as well as to minimize risks due to the pipeline initiation process. Inside the congested area the initiation with aid of a 'dead-man' anchor on the sea bottom, which would be a more conventional solution, becomes impossible in most cases. This paper will discuss the engineering work required to perform the 'DP pull-in' as well as show the operational steps, from the start-up to the final abandonment of the pipeline initiation head inside the target area. (author)

  9. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  10. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  11. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  12. Evaporation equipment for the rational measurement of the radioactivity of water; Dispositif d'evaporation pour la mesure rationnelle de la radioactivite de l'eau

    Energy Technology Data Exchange (ETDEWEB)

    Hasenjager, H [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1960-07-01

    An apparatus is described whereby the water can be evaporated directly in the radioactive sample holder in which the sample is counted. Rapid evaporation is obtained by the heating of the dish combined with the application of a jet of hot air. Liquid is added to the dish and the heating stopped automatically at the end of evaporation. The speed of evaporation and the Losses in activity as a function of the degree of heating were studied for various substances and different qualities of water (permuted water, tap water, rainwater). Complexones are added to avoid losses of activity. (author) [French] Un ensemble d'appareils permet d'evaporer l'eau directement dans la coupelle de mesure. Le chauffage de la coupelle combine avec l'application d'un jet d'air chaud assure une evaporation rapide. L'alimentation de la coupelle et l'arret du chauffage a la fin de l'evaporation sont automatiques. La vitesse d'evaporation et les pertes d'activite en fonction de l'intensite de chauffage ont ete etudiees pour differents corps et differentes qualites d'eau (eau permutee, eau de ville, eau de pluie). On ajoute des complexons pour eviter des pertes d'activites. (auteur)

  13. Evaporation equipment for the rational measurement of the radioactivity of water; Dispositif d'evaporation pour la mesure rationnelle de la radioactivite de l'eau

    Energy Technology Data Exchange (ETDEWEB)

    Hasenjager, H. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1960-07-01

    An apparatus is described whereby the water can be evaporated directly in the radioactive sample holder in which the sample is counted. Rapid evaporation is obtained by the heating of the dish combined with the application of a jet of hot air. Liquid is added to the dish and the heating stopped automatically at the end of evaporation. The speed of evaporation and the Losses in activity as a function of the degree of heating were studied for various substances and different qualities of water (permuted water, tap water, rainwater). Complexones are added to avoid losses of activity. (author) [French] Un ensemble d'appareils permet d'evaporer l'eau directement dans la coupelle de mesure. Le chauffage de la coupelle combine avec l'application d'un jet d'air chaud assure une evaporation rapide. L'alimentation de la coupelle et l'arret du chauffage a la fin de l'evaporation sont automatiques. La vitesse d'evaporation et les pertes d'activite en fonction de l'intensite de chauffage ont ete etudiees pour differents corps et differentes qualites d'eau (eau permutee, eau de ville, eau de pluie). On ajoute des complexons pour eviter des pertes d'activites. (auteur)

  14. Evaluation of biocide efficacy on microbiological induced corrosion of pipes and equipment from the 'process water system' of Embalse nuclear power plant (CNE)

    International Nuclear Information System (INIS)

    Forte Giacobone, A F; Burkart, A L; Pizarro, R; Rodriguez S; Belloni, M; Croatto, F; Ferrari, F; Herrera, C; Mendizabal, M; Montes, J; Rodriguez Aliciardi, M; Saucedo, R; Ovando, L

    2012-01-01

    In order to improve water quality, and mitigate recurrent bio corrosion phenomena affecting the components of the Process Water System of the CNE, a combined water treatment adding a commercial biocide product, based on bromide, to the currently injected chlorine was proposed. The aim of this study was to evaluate the effect of the added biocide on the kinetics of biofilm formation and growth, which is the precursor process to microbiological corrosion, and on the corrosion rates of carbon steel of pipes, heat exchanger shells and other system devices. For this purpose, a test bench was designed and built, reproducing the flow conditions at certain parts of the system. This facility was installed in the filtration shed of the Water Plant of the CNE. The test bench consisted of two parallel chambers, I and II, each in turn divided into a section for determining biofilm growth and corrosion rates of carbon steel coupons and another one to measure the kinetics of biofilm growth on stainless steel coupons. Both chambers received lake water chlorinated for 15 minutes each day. The chamber II received also the biocide. The corrosion rate in carbon steel coupons was evaluated by weight loss and Linear Polarization Resistance (LPR) measurements. The kinetics of biofilm growth on carbon steel coupons was measured using disruptive methods followed by quantification of the protein and carbohydrate content as an estimation of total biomase. The following bacterial groups were quantified through the dilution-extinction method: total aerobic bacteria, acid-producing bacteria, total anaerobic bacteria, sulfate reducing bacteria and bacteria precipitating iron and manganese. On the stainless steel coupons, the percent of coverage was evaluated by epi fluorescence microscopy. The corrosion rate results obtained both by weight loss as by LPR, showed no significant differences between both chambers, with and without biocide. Regarding the kinetics of biofilm growth on carbon steel

  15. Waste Water reuse in Tenerife. Equipment to improve water quality for agriculture use; Reutilizacion de aguas depuradas en la Isla de Tenerife. Instalaciones para la mejora de la calidad para uso agricola

    Energy Technology Data Exchange (ETDEWEB)

    Aguiar, E.; Delgado, S.; Renz, O.; Gonzalez, A.

    1999-06-01

    In this work it is briefly shown the infrastructure of reclaimed water reuse for agriculture in Tenerife (Canary Islands-Spain). The problems dealing with the lack of water resources in the island and the growth of reclaimed water demand are explained. It is also commented the invetment done in the actual infrastructure, analizing the more economically important items. This work compares the price of reclaimed water with the price of the conventional irrigation water. Finally, the process of waste water desalination down to the required salinity is shortly explained and the cost of it is also evaluated. (Author) 13 refs.

  16. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  17. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  18. Process and equipment for the detection of impurities like salted water and sulfur contained in a multiphase fluid by nuclear techniques

    International Nuclear Information System (INIS)

    Arnold, D.M.; Paap, H.J.

    1981-01-01

    A technique for detecting impurities, like sulfur and salted water, in petroleum refineries is described. The fluid is bombarded with fast neutrons which are showed down and then captured producing gamma spectra. Analysis of the spectra indicates the relative presence of sulfur, hydrogen and chlorine. The gas/liquid ratio of the fluid can also be calculated. An apparatus making use of this technique is also described [fr

  19. Highly Sensitive and Selective Uranium Detection in Natural Water Systems Using a Luminescent Mesoporous Metal-Organic Framework Equipped with Abundant Lewis Basic Sites: A Combined Batch, X-ray Absorption Spectroscopy, and First Principles Simulation Investigation.

    Science.gov (United States)

    Liu, Wei; Dai, Xing; Bai, Zhuanling; Wang, Yanlong; Yang, Zaixing; Zhang, Linjuan; Xu, Lin; Chen, Lanhua; Li, Yuxiang; Gui, Daxiang; Diwu, Juan; Wang, Jianqiang; Zhou, Ruhong; Chai, Zhifang; Wang, Shuao

    2017-04-04

    Uranium is not only a strategic resource for the nuclear industry but also a global contaminant with high toxicity. Although several strategies have been established for detecting uranyl ions in water, searching for new uranium sensor material with great sensitivity, selectivity, and stability remains a challenge. We introduce here a hydrolytically stable mesoporous terbium(III)-based MOF material compound 1, whose channels are as large as 27 Å × 23 Å and are equipped with abundant exposed Lewis basic sites, the luminescence intensity of which can be efficiently and selectively quenched by uranyl ions. The detection limit in deionized water reaches 0.9 μg/L, far below the maximum contamination standard of 30 μg/L in drinking water defined by the United States Environmental Protection Agency, making compound 1 currently the only MOF material that can achieve this goal. More importantly, this material exhibits great capability in detecting uranyl ions in natural water systems such as lake water and seawater with pH being adjusted to 4, where huge excesses of competing ions are present. The uranyl detection limits in Dushu Lake water and in seawater were calculated to be 14.0 and 3.5 μg/L, respectively. This great detection capability originates from the selective binding of uranyl ions onto the Lewis basic sites of the MOF material, as demonstrated by synchrotron radiation extended X-ray adsorption fine structure, X-ray adsorption near edge structure, and first principles calculations, further leading to an effective energy transfer between the uranyl ions and the MOF skeleton.

  20. 33 CFR 106.255 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated, and...

  1. 77 FR 75400 - Labeling Requirements for Commercial and Industrial Equipment

    Science.gov (United States)

    2012-12-20

    ...-intensity discharge lamps, distribution transformers, and small electric motors as covered equipment. (42 U... following: Electric motors and pumps; commercial HVAC and water heating equipment (small, large, and very... prescribed for certain types of covered equipment. Specific requirements are established for electric motors...

  2. Water

    Science.gov (United States)

    ... www.girlshealth.gov/ Home Nutrition Nutrition basics Water Water Did you know that water makes up more ... to drink more water Other drinks How much water do you need? top Water is very important, ...

  3. Technical support document: Energy efficiency standards for consumer products: Room air conditioners, water heaters, direct heating equipment, mobile home furnaces, kitchen ranges and ovens, pool heaters, fluorescent lamp ballasts and television sets. Volume 1, Methodology

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The Energy Policy and Conservation Act (P.L. 94-163), as amended, establishes energy conservation standards for 12 of the 13 types of consumer products specifically covered by the Act. The legislation requires the Department of Energy (DOE) to consider new or amended standards for these and other types of products at specified times. DOE is currently considering amending standards for seven types of products: water heaters, direct heating equipment, mobile home furnaces, pool heaters, room air conditioners, kitchen ranges and ovens (including microwave ovens), and fluorescent light ballasts and is considering establishing standards for television sets. This Technical Support Document presents the methodology, data, and results from the analysis of the energy and economic impacts of the proposed standards. This volume presents a general description of the analytic approach, including the structure of the major models.

  4. HVAC systems and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.T. (Linford Air and Refrigeration Company, Oakland, CA (US))

    1990-02-01

    The author discusses the section of the ASHRAE Standard 90.1-1989 which addresses HVAC systems and equipment. New features of HVAC systems mandatory general requirements are described. New prescriptive requirements are detailed.

  5. Personal Protective Equipment

    National Research Council Canada - National Science Library

    1998-01-01

    ... of personal protective equipment A safety program for new employees is a necessary part of any orientation program An on-going safety program should be used to motivate employees to continue to use...

  6. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  7. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  8. Transfer of Escherichia coli O157:H7 from equipment surfaces to fresh-cut leafy greens during processing in a model pilot-plant production line with sanitizer-free water.

    Science.gov (United States)

    Buchholz, Annemarie L; Davidson, Gordon R; Marks, Bradley P; Todd, Ewen C D; Ryser, Elliot T

    2012-11-01

    Escherichia coli O157:H7 contamination of fresh-cut leafy greens has become a public health concern as a result of several large outbreaks. The goal of this study was to generate baseline data for E. coli O157:H7 transfer from product-inoculated equipment surfaces to uninoculated lettuce during pilot-scale processing without a sanitizer. Uninoculated cored heads of iceberg and romaine lettuce (22.7 kg) were processed using a commercial shredder, step conveyor, 3.3-m flume tank with sanitizer-free tap water, shaker table, and centrifugal dryer, followed by 22.7 kg of product that had been dip inoculated to contain ∼10(6), 10(4), or 10(2) CFU/g of a four-strain avirulent, green fluorescent protein-labeled, ampicillin-resistant E. coli O157:H7 cocktail. After draining the flume tank and refilling the holding tank with tap water, 90.8 kg of uninoculated product was similarly processed and collected in ∼5-kg aliquots. After processing, 42 equipment surface samples and 46 iceberg or 36 romaine lettuce samples (25 g each) from the collection baskets were quantitatively examined for E. coli O157:H7 by direct plating or membrane filtration using tryptic soy agar containing 0.6% yeast extract and 100 ppm of ampicillin. Initially, the greatest E. coli O157:H7 transfer was seen from inoculated lettuce to the shredder and conveyor belt, with all equipment surface populations decreasing 90 to 99% after processing 90.8 kg of uncontaminated product. After processing lettuce containing 10(6) or 10(4) E. coli O157:H7 CFU/g followed by uninoculated lettuce, E. coli O157:H7 was quantifiable throughout the entire 90.8 kg of product. At an inoculation level of 10(2) CFU/g, E. coli O157:H7 was consistently detected in the first 21.2 kg of previously uninoculated lettuce at 2 to 3 log CFU/100 g and transferred to 78 kg of product. These baseline E. coli O157:H7 transfer results will help determine the degree of sanitizer efficacy required to better ensure the safety of fresh-cut leafy

  9. Sub-sea program of CNEXO

    Energy Technology Data Exchange (ETDEWEB)

    Jarry, J [CNEXO, 75 - Paris (France)

    1984-01-01

    This program, briefly presented in this paper, concerns the means for underwater operations. The projects concern four principal fields: diving, offshore assistance submarine with a large autonomy, submarine robotics and intervention on wrecks.

  10. Effects of phosphate addition on biofilm bacterial communities and water quality in annular reactors equipped with stainless steel and ductile cast iron pipes.

    Science.gov (United States)

    Jang, Hyun-Jung; Choi, Young-June; Ro, Hee-Myong; Ka, Jong-Ok

    2012-02-01

    The impact of orthophosphate addition on biofilm formation and water quality was studied in corrosion-resistant stainless steel (STS) pipe and corrosion-susceptible ductile cast iron (DCI) pipe using cultivation and culture-independent approaches. Sample coupons of DCI pipe and STS pipe were installed in annular reactors, which were operated for 9 months under hydraulic conditions similar to a domestic plumbing system. Addition of 5 mg/L of phosphate to the plumbing systems, under low residual chlorine conditions, promoted a more significant growth of biofilm and led to a greater rate reduction of disinfection by-products in DCI pipe than in STS pipe. While the level of THMs (trihalomethanes) increased under conditions of low biofilm concentration, the levels of HAAs (halo acetic acids) and CH (chloral hydrate) decreased in all cases in proportion to the amount of biofilm. It was also observed that chloroform, the main species of THM, was not readily decomposed biologically and decomposition was not proportional to the biofilm concentration; however, it was easily biodegraded after the addition of phosphate. Analysis of the 16S rDNA sequences of 102 biofilm isolates revealed that Proteobacteria (50%) was the most frequently detected phylum, followed by Firmicutes (10%) and Actinobacteria (2%), with 37% of the bacteria unclassified. Bradyrhizobium was the dominant genus on corroded DCI pipe, while Sphingomonas was predominant on non-corroded STS pipe. Methylobacterium and Afipia were detected only in the reactor without added phosphate. PCR-DGGE analysis showed that the diversity of species in biofilm tended to increase when phosphate was added regardless of the pipe material, indicating that phosphate addition upset the biological stability in the plumbing systems.

  11. Technical support document: Energy efficiency standards for consumer products: Room air conditioners, water heaters, direct heating equipment, mobile home furnaces, kitchen ranges and ovens, pool heaters, fluorescent lamp ballasts and television sets. Volume 3, Water heaters, pool heaters, direct heating equipment, and mobile home furnaces

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This is Volume 3 in a series of documents on energy efficiency of consumer products. This volume discusses energy efficiency of water heaters. Water heaters are defined by NAECA as products that utilize oil, gas, or electricity to heat potable water for use outside the heater upon demand. These are major appliances, which use a large portion (18% on average) of total energy consumed per household (1). They differ from most other appliances in that they are usually installed in obscure locations as part of the plumbing and are ignored until they fail. Residential water heaters are capable of heating water up to 180{degrees}F, although the setpoints are usually set lower.

  12. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  13. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  14. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  15. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  16. Calculational-experimental examination and ensuring of equipment and pipelines seismic resistance at starting and operating water-cooled and moderated reactor WWER-type NPPs. Final report from 1 November 1994 to 31 October 1995

    International Nuclear Information System (INIS)

    Kaznovski, S.

    1996-01-01

    The method for examination and ensuring of equipment seismic resistance is based on the resonance character of the seismic influence on structures and equipment. Values of natural dynamic characteristics are obtained by using external source for exciting the vibrations of the testing unit. These characteristics with the floor response spectra enabled calculations of the seismic resistance. For tests of Kozloduy NPP equipment a simple shock method was used. The presentation includes the list of inspected equipment. The calculations of the equipment seismic resistance were carried out on the basis of Russian and International standards and demands

  17. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  18. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  19. Experimental equipment, ch. 6

    International Nuclear Information System (INIS)

    Boomstra, F.; Hoogenboom, A.M.; Prins, C.M.; Strasters, B.A.; Vermeer, A.; Wit, P. de; Zwol, N.A. van.

    1977-01-01

    The experimental equipment in use at Utrecht university is discussed. Attention is paid to the tandem Van de Graaff accelerator and the 4MV and 1MV accelerators. The detection systems for gamma-ray spectroscopy are reviewed with emphasis on the compton-suppression spectrometer. The data-handling system used for experiments with the tandem is also briefly discussed

  20. Equipment gift to Monaco

    International Nuclear Information System (INIS)

    1970-01-01

    Research work at the Agency's Laboratory of Marine Radioactivity in Monaco, including that concerned with pollution of the sea, has been made more effective by its latest acquisition of equipment. This is a spectrophotometer donated by the Federal Republic of Germany. (author)

  1. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  2. Safeguards techniques and equipment

    International Nuclear Information System (INIS)

    1997-01-01

    The current booklet is intended to give a full and balanced description of the techniques and equipment used for both nuclear material accountancy and containment and surveillance measures, and for the new safeguards measure of environmental sampling. As new verification measures continue to be developed, the material in the booklet will be periodically reviewed and updated versions issued. (author)

  3. Equipping tomorrow's fire manager

    Science.gov (United States)

    Christopher A. Dicus

    2008-01-01

    Fire managers are challenged with an ever-increasing array of both responsibilities and critics. As in the past, fire managers must master the elements of fire behavior and ecology using the latest technologies. In addition, today’s managers must be equipped with the skills necessary to understand and liaise with a burgeoning group of vocal stakeholders while also...

  4. Electrical equipment design library

    International Nuclear Information System (INIS)

    1994-01-01

    This book guides the design supervision, construction order for electrical equipment. The contents of this library are let's use electricity like this, leading-in-pole and casual power, electric pole install below 300KVA, electric pole install below 301∼1000KVA, electric pole install exceed 1000KVA, rooftop install exceed 1000KVA, CUBICLE type, 154KV services. It adds an appendix.

  5. Orphee reactor experimental equipment

    International Nuclear Information System (INIS)

    1987-01-01

    Experimental equipment around the ORPHEE reactor is presented. The neutron source; and the spectrometers and sample environment (inelastic and quasi-elastic scattering, elastic scattering, spread scattering, small angle scattering) are described. An experiment proposal and reports guide is supplied [fr

  6. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  7. Underground coal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chadwick, J.

    2002-12-01

    This paper reports on increasing automation and enhanced productivity on longwalls, new development cutting and bolting technologies and haulage systems. Amongst equipment discussed is DBT's Electra series EL3000 shearer, the Dosco LH1400 roadheader with onboard bolters, and Joy 12 CM30 continuous miners. 4 photos.

  8. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  9. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  10. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  11. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  12. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  13. Tube for irradiation equipment

    International Nuclear Information System (INIS)

    Goehrich, K.; Vogt, H.

    1979-01-01

    This patent describes a tube for irradiation equipment for limiting an emergent beam, with a baseplate, possessing a central aperture, intended for attaching to the equipment, as well as four carrier plates, each of which possesses a limiting edge and a sliding edge located at right angles thereto. The carrier plates are located parallel to the baseplate, the limiting edge of each carrier plate resting against the sliding edge of the adjacent carrier plate and each of the two mutually opposite pairs of carrier plates being displaceable, parallel to the direction of its sliding edges and symmetrically to the center of the transmission aperture, for the purpose of continuously varying the transmission aperture defined by the limiting edges, during which displacement each of the displaced carrier plates carries with it the carrier plate, resting against the limiting edge of the former plate, parallel to the direction of the limiting edge of the latter plate. 8 claims

  14. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  15. Equipment for isotope diagnostics

    International Nuclear Information System (INIS)

    Platz, W.

    1976-01-01

    The invention concerns an improvement of equipment for isotope diagnostics allowing to mark special intensity ranges of the recorded measurements by means of different colors. For undisturbed operation it is of advantage to avoid electric circuits between movable and unmovable parts of the color recorder. According to the invention, long gear wheels of glass fiber-reinforced polyamide are used for these connections. (ORU) [de

  16. Soviet equipment flies in

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    End of February 1977 a Soviet Ilyushin-76 heavy freight aircraft landed at Cointrin airport having on board fifty large wire proprtional chambers and associated apparatus, together weighing 10 tons, supplied by the Joint Institute for Nuclear Research, Dubna, USSR. The equipment was for the CERN- Dubna-Munich-Saclay experiment NA4 on deep inelastic muon scattering being set up in the North Area of SPS. See Weekly Bulletin 11/78.

  17. Labelling of equipment dispensers.

    Science.gov (United States)

    Gray, D C

    1993-01-01

    A new labelling system for use on medical equipment dispensers is tested. This system uses one of the objects stored in each unit of the dispenser as the 'label', by attaching it to the front of the dispenser with tape. The new system was compared to conventional written labelling by timing subjects asked to select items from two dispensers. The new system was 27% quicker than the conventional system. Images Fig. 1 PMID:8110335

  18. Equipment selection for atmospheric drying

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, P D; Bhattacharyya, S [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Heavy water management is a major factor in deciding the economics of the PHWRs. Hence it is necessary to have an efficient recovery system, for the heavy water vapour escaping from various process systems and maintain a dry atmosphere in the recovery areas. While the basic objective of the atmospheric drying system is to maximize recovery and to minimize stack losses, it is equally important to optimally design the system with due consideration to operational and maintenance aspects. At present, heavy water vapour recovery in the existing Nuclear Power Plants (NPPs) is carried out by dryers of dual fixed bed design. While moving bed design could have some advantages, this has not been adopted so far because of the cumbersome mechanical design involved and special requirements for nuclear application. Developmental work done in this direction has resulted in compact alternative designs. In one of the designs, the change over from adsorption to regeneration is achieved by rotating the bed slowly. This concept is further refined in another alternative using a dessicant wheel. This paper contains brief equipment description of different designs; enumerates the design requirements of an atmospheric drying system for reactor building; describes steps for designing fixed bed type D{sub 2}O vapour recovery system, and highlights advances in dryer technology. (author). 2 refs., 4 figs., 1 ill.

  19. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  20. Personal protective equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This Practical Radiation Technical Manual is one of a series that has been designed to provide guidance on radiological protection for employers, radiation protection officers, managers and other technically competent persons who have responsibility for ensuring the safety of employees working with ionizing radiation. The Manual may be used with the appropriate IAEA Practical Radiation Safety Manuals to provide training, instruction and information for all employees engaged in work with ionizing radiation. Personal protective equipment (PPE) includes clothing or other special equipment that is issued to individual workers to provide protection against actual or potential exposure to ionizing radiations. It is used to protect each worker against the prevailing risk of external or internal exposure in circumstances in which it is not reasonably practicable to provide complete protection by means of engineering controls or administrative methods. Adequate personal protection depends on PPE being correctly selected, fitted and maintained. Appropriate training for the users and arrangements to monitor usage are also necessary to ensure that PPE provides the intended degree of protection effectively. This Manual explains the principal types of PPE, including protective clothing and respiratory protective equipment (RPE). Examples of working procedures are also described to indicate how PPE should be used within a safe system of work. The Manual will be of most benefit if it forms part of a more comprehensive training programme or is supplemented by the advice of a qualified expert in radiation protection. Some of the RPE described in this Manual should be used under the guidance of a qualified expert

  1. Sodium cleaning device for nuclear reactor equipments

    International Nuclear Information System (INIS)

    Fujisawa, Morio.

    1985-01-01

    Purpose: To enable sodium cleaning over the entire length of large size equipments such as control rod drives and primary coolant recycling pumps for use in FBR type reactors. Constitution: A plurality of warm water supply nozzles each having a valve are connected at varying height on the side of a cleaning tank, to which an exhaust line is connected. These nozzles are connected with an exhaust port at the bottom of the tank to constitute a pipeway for cleaning warm water recycling line including a water feed pump and a feedwater heater. The water level in the tank is changed stepwise by successively selecting the warm water feed nozzles. Further, the warm water in the tank is recyclically fed through the nozzles selected at each step of the water level through the recycle line while warming. On the other hand, the pressure inside the tank is reduced through the exhaust line, whereby the warm water in the tank is boiled at low temperature to clean-up sodium on the equipments to be cleaned over the entire length. (Horiuchi, T.)

  2. Altura da lâmina, tempo e volume de enchimento de um equipamento de irrigação por pavio e determinação da uniformidade de distribuição de água em substratos Water depth, filling time and volume of wick irrigation equipment and determination of water distribution uniformity in substrates

    Directory of Open Access Journals (Sweden)

    Rhuanito Soranz Ferrarezi

    2012-01-01

    Full Text Available Os objetivos deste experimento foram realizar a avaliação da altura da lâmina de água, do tempo e volume de enchimento de um equipamento de irrigação por pavio usando calhas autocompensadoras e determinar a uniformidade de distribuição de água (UDA nesse equipamento utilizando substratos orgânicos comerciais (casca de pinus/CP e fibra de coco/FC. Dois módulos experimentais foram montados em delineamento experimental inteiramente casualizado com cinco repetições. Verificou-se grande variação das medidas de altura da lâmina de água (1,6 a 4,0 cm, mesmo com o equipamento nivelado. O tempo médio de enchimento foi de 6h22min para o Módulo 1 com CP e de 3h45min para o Módulo 2 com FC. O volume de enchimento foi variável, observando-se que as calhas das extremidades (n.° 1 e 5 apresentaram os menores volumes no Módulo 1, e as calhas do início (n.° 1 e 2 no Módulo 2. No Módulo 1, a umidade volumétrica (θ variou de 42% a 94%, e no Módulo 2, de 24% a 72%, com pontos isolados de secamento e/ou encharcamento. A altura da lâmina de água, o tempo e o volume de enchimento das calhas foram desuniformes nos dois módulos experimentais e nas cinco calhas autocompensadoras, indicando imperfeições no equipamento. A distribuição de água foi variável nos substratos em razão de suas características físico-hídricas e também da altura da lâmina de água nas calhas, apresentando maior umidade e uniformidade de distribuição de água na casca de pinus do que na fibra de coco.The aims of this study were to evaluate the water depth, filling time and volume in a wick irrigation equipment using auto compensating gutters and to determine the water distribution uniformity (WDU in these equipments filled with organic commercial substrates (pine bark/PB and coconut coir/CC. We assembled two experimental modules in a completely randomized design with five replications. There was variation in water depth measurements (1.6 to 4.0 cm, even

  3. Calculational-experimental examination and ensuring of equipment and pipelines seismic resistance at starting and operating water-cooled WWER-type reactor NPPs. Final report. From 01 May 1997 - 30 April 1998

    International Nuclear Information System (INIS)

    Kaznovski, S.

    1999-01-01

    In conformity with request from Paks NPP in July 1997 the additional dynamic tests of the following units of equipment were carried out: Heat exchanger (Diesel Generator Station); Jalousie (Diesel Generator Station); Axial ventilator (Main Building, gallery of electric equipment). The natural frequencies of equipment were obtained as results of these testing. For all tested units the calculations of seismic resistance were carried out. The method of finite elements and special computer programmes of KBGU (ISPA, and others) were used. Calculations were carried out in accordance with modem standards. The calculations of tested equipment seismic resistance are carried out based on the obtained experimental data and NPP floor response spectra. The necessary recommendations for unsatisfactory equipment are worked out

  4. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  5. Water

    Science.gov (United States)

    ... drink and water in food (like fruits and vegetables). 6. Of all the earth’s water, how much is ocean or seas? 97 percent of the earth’s water is ocean or seas. 7. How much of the world’s water is frozen? Of all the water on earth, about 2 percent is frozen. 8. How much ...

  6. Mining face equipment

    Energy Technology Data Exchange (ETDEWEB)

    G, Litvinskiy G; Babyuk, G V; Yakovenko, V A

    1981-01-07

    Mining face equipment includes drilling advance wells, drilling using explosives on the contour bore holes, loading and transporting the crushed mass, drilling reinforcement shafts, injecting reinforcement compounds and moving the timber. Camouflet explosives are used to form relaxed rock stress beyond the mining area to decrease costs of reinforcing the mining area by using nonstressed rock in the advance well as support. The strengthening solution is injected through advanced cementing wells before drilling the contour bores as well as through radial cementing wells beyond the timbers following loading and transport of the mining debris. The advance well is 50-80 m.

  7. Coal ash monitoring equipment

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, C G; Wormald, M R

    1978-10-02

    The monitoring equipment is used to determine the remainder from combustion (ash slack) of coal in wagons designed for power stations. Next to the rails, a neutron source (252 Cf, 241 Am/Be) is situated, which irradiates the coal with neutrons at a known dose, which produces the reaction 27 Al (n ..gamma..) Al 28. The aluminium content is a measure of the remainder. The 1.78 MeV energy is measured downstream of the rail with a detector. The neutron source can only act in the working position of a loaded wagon.

  8. Management of Transportation Equipment.

    Science.gov (United States)

    1982-11-01

    Record% % %. "jP -M -. M LIh TRANSPORTATION MAENTKENAI4CE SHOP WORKLOAD CONTROL WORK CENTER SADR A-OR .a’* tLR 4.,R53 8114LM 0 o 251 50 75 100 125 ISO ...PDBP 06 7 4892 TRACTOR, WHEEL, INDUST, 14001-20000 PDBP 06 7 4893 TRACTOR, WHEEL, INDUST, 20001-27000 PDBP 06 7 4894 TRACTOR, WHEEL, INDUST, 27001 PDBP...27K TRACTOR, WHEEL, INDUST, 27001 PDBP & UP P-i LINE ITEM 07 LIGHTING AND POWER GENERATION EQUIPMENT 5110 T FLOODLIGHT ELEC FLOODLIGHT, ELEC, TRUCK

  9. 33 CFR 157.170 - COW equipment: Removal.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false COW equipment: Removal. 157.170... Crude Oil Washing (COW) System on Tank Vessels Cow Operations § 157.170 COW equipment: Removal. (a) Whenever a deck mounted COW machine is removed from the tank, the master shall ensure that: (1) The supply...

  10. 33 CFR 154.545 - Discharge containment equipment.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Equipment Requirements § 154... chapter may be utilized in the planning requirements of subpart F and subpart H of this part. [CGD 75-124... material and equipment to contain any oil or hazardous material discharged on the water from operations at...

  11. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  12. Water

    International Nuclear Information System (INIS)

    Chovanec, A.; Grath, J.; Kralik, M.; Vogel, W.

    2002-01-01

    An up-date overview of the situation of the Austrian waters is given by analyzing the status of the water quality (groundwater, surface waters) and water protection measures. Maps containing information of nitrate and atrazine in groundwaters (analyses at monitoring stations), nitrate contents and biological water quality of running waters are included. Finally, pollutants (nitrate, orthophosphate, ammonium, nitrite, atrazine etc.) trends in annual mean values and median values for the whole country for the years 1992-1999 are presented in tables. Figs. 5. (nevyjel)

  13. Review of Climatic Protection Techniques for Electronic Equipments.

    Science.gov (United States)

    1982-10-01

    that the water vapour to be measured is carried in a dry nitrogen gas flow to an electrolytic cell which electrolyses the water vapour to hydrogen and...environments, the major factor being protection from the effects of water and water vapour in the atmosphere aided by temperature effects. The effects of...moisture on equipments, achieving and maintaining a dry interior, sealing standards, water vapour barriers, desiccation, drying-out procedures and

  14. Water

    Science.gov (United States)

    ... can be found in some metal water taps, interior water pipes, or pipes connecting a house to ... reduce or eliminate lead. See resources below. 5. Children and pregnant women are especially vulnerable to the ...

  15. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  16. Coal mining equipment

    International Nuclear Information System (INIS)

    Stein, R.R.; Martin, T.W.

    1991-01-01

    The word in longwall components is big, and these larger components have price tags to match. The logic behind the greater investment is that it will yield high production rates and good uptime statistics. This is true in most cases. More important than single-shift tonnage records, average shift production continues to climb upwards. This paper reports on the quality, and more significantly, the quantity of service supplied for long-wall equipment, which has reached levels that would have been seen as unachievable when longwall mining was first introduced in the U.S. The school of thought then was that longwall would increase productivity in part by reducing the number of production units and thus reducing the number of personnel employed underground. The expectation of fewer employees turned out to be unrealistic. That was probably one reason that some early attempts to install longwall system looked more like failures than vision of the future

  17. Reactor fuel charging equipment

    International Nuclear Information System (INIS)

    Wade, Elman.

    1977-01-01

    In many types of reactor fuel charging equipment, tongs or a grab, attached to a trolley, housed in a guide duct, can be used for withdrawing from the core a selected spent fuel assembly or to place a new fuel assembly in the core. In these facilities, the trolley may have wheels that roll on rails in the guide duct. This ensures the correct alignment of the grab, the trolley and fuel assembly when this fuel assembly is being moved. By raising or lowering such a fuel assembly, the trolley can be immerged in the coolant bath of the reactor, whereas at other times it can be at a certain level above the upper surface of the coolant bath. The main object of the invention is to create a fuel handling apparatus for a sodium cooled reactor with bearings lubricated by the sodium coolant and in which the contamination of these bearings is prevented [fr

  18. Method for keeping equipment and pipeline of nuclear power plant

    International Nuclear Information System (INIS)

    Okubo, Osamu.

    1990-01-01

    The present invention intends to suppress corrosion of equipments and pipelines in condensate, feedwater and feedwater heater drain systems during operation of a nuclear power plant. That is, condensate, feedwater and drain remained in equipments and pipelines just after the stopping of operation are passed through pipelines comprising only conduits, or they are introduced to a condensator passing through the pipelines and condensate pipes. Further, the remaining droplets on the inner surfaces are evaporated by the remaining heat of the equipments and the pipelines themselves. Then, the equipments and pipelines are isolated from other regions and kept. In view of the above, since condensate, feedwater and water feeder drains are introduced directly to the condensator passing through the conduits in which other equipments such as tanks and pumps are not present and are isolated and kept, corrosion of the equipments and the pipelines is suppressed and radioactive contamination is suppressed from prevailing by way of cruds. (I.S.)

  19. Auxiliary equipment cooling circuit in nuclear reactors

    International Nuclear Information System (INIS)

    Yanagisawa, Ko.

    1986-01-01

    Purpose: To prevent the propagation of bacterias that transform NO 2 into NO 3 in auxiliary equipment coolants using corrosion inhibitors of nitrite type in BWR type reactors. Method: In auxiliary equipments coolant systems, water quality is controlled by using purified water as supplement water and nitrite such as Na 2 NO 2 as the corrosion inhibitors. However, in the circumstance where dissolved oxygen is present, bacteria propagate to oxidize NO 2 into NO 3 . Thus, NO 2 at 200 ppm is reduced to 20 ppm. In view of the above, a surge tank supplied from water supplement line is connected in series and a deaeration device is disposed thereto. Since the presence of dissolved oxygen causes the bacteria to propagate it is desired that the dissolved oxygen density in the supplement water is less than 5 ppm. Deaeration and pressure reduction in the surge tank can remove the dissolved oxygen, prevent NO 3 increase and also prevent stress corrosion cracks in the system pipeways. (Horiuchi, T.)

  20. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  1. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  2. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  3. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  4. Water

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-08-01

    Full Text Available Water scarcity is without a doubt on of the greatest threats to the human species and has all the potential to destabilise world peace. Falling water tables are a new phenomenon. Up until the development of steam and electric motors, deep groudwater...

  5. Water

    OpenAIRE

    Hertie School of Governance

    2010-01-01

    All human life depends on water and air. The sustainable management of both is a major challenge for today's public policy makers. This issue of Schlossplatz³ taps the streams and flows of the current debate on the right water governance.

  6. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  7. The reduction of noise from hydraulic equipments; La reduction du bruit provenant des equipements hydrauliques

    Energy Technology Data Exchange (ETDEWEB)

    Gential, R.

    1996-09-01

    Noise pollution from hydraulic equipments (bath filling, toilets taps, waste waters flow, vibrations, knocks in water pipes, dilatation clattering in heating pipes, hissing of heater taps etc..) are one of the principal causes of nuisance inside residential buildings. Solutions exist and consist in the replacement of old cocks and fittings, the use of soundproof clamps for pipes and noise absorbing supports for baths etc.. This paper summarizes the available modern equipments with a low-noise warranty (cocks and fittings, noise dampers, anti-backflow valves, pressure reducers) and the practical solutions for the modification of existing installations (increase of pipe diameters, reduction of pipe lengths, use of flexible fittings, hydraulic counterbalancing of water flows in heaters etc..). (J.S.)

  8. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  9. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  10. Cryogenic equipment; Materiel cryogenique

    Energy Technology Data Exchange (ETDEWEB)

    Leger, L; Javellaud, J; Caro, C; Gilguy, R; Testard, O

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [French] De nombreuses experiences utilisant les basses temperatures, necessitent l'emploi d'un materiel cryogenique complexe n'existant pas dans le commerce. Les cryostats presentes ici ont ete realises a partir d'elements standard, ce qui permet, malgre la diversite des appareils, de realiser un ensemble a moindre frais. Les reservoirs d'azote et d'helium liquides ont ete concus de facon a limiter les pertes et a conferer au cryostat la plus grande autonomie possible. L'enceinte experimentale situee en general dans la partie inferieure de l'appareil necessite dans tous les cas une etude speciale. D'autre part des ensembles complets tels que les cannes de transfert, piege isole, robinet pour vide secondaire, ont ete concus dans le meme souci de rentabilite et de standardisation. Ce materiel peut donc repondre a un grand nombre d'exigences experimentales, il est facilement adaptable, et les consommations d'helium et d'azote liquide sont tres reduites. (auteurs)

  11. Field development. Concept selection in deep water environment offshore Angola

    Energy Technology Data Exchange (ETDEWEB)

    Guenot, A.; Berger, J.C.; Limet, N. [TotalFinaElf, la Defense 6, Rosa-Lirio Project Group, 92 - Courbevoie (France)

    2002-10-01

    The significant oil discoveries made at the end of the 90's in the deep water environment offshore the coast of Angola, has led to a considerable amount of development activities. The first field in production was the turnkey development of the Kuito field on the Block 14 operated by Chevron. More recently the Girassol field has been put successfully in production on the Block 17, operated by TotalFinaElf. Both developments are making use of sub-sea wells connected to a moored dedicated FPSO. On the western side of the Girassol field, several discoveries have been made. They are known as the Rosa Lirio pole, from the names of two of the main channels. Values for water depth are in the same range than on Girassol (1300- 1400 m). A project group has been established in 1999 to evaluate the development of these discoveries. The purpose of this paper is to present the conceptual work which as been carried out, and in particular to show that even if many different concepts have been evaluated, the final choice has been also to make use of sub-sea trees. (authors)

  12. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  13. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  14. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  15. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  16. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  17. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  18. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  19. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  20. Water

    Directory of Open Access Journals (Sweden)

    E. Sanmuga Priya

    2017-05-01

    Full Text Available Phytoremediation through aquatic macrophytes treatment system (AMATS for the removal of pollutants and contaminants from various natural sources is a well established environmental protection technique. Water hyacinth (Eichhornia crassipes, a worst invasive aquatic weed has been utilised for various research activities over the last few decades. The biosorption capacity of the water hyacinth in minimising various contaminants present in the industrial wastewater is well studied. The present review quotes the literatures related to the biosorption capacity of the water hyacinth in reducing the concentration of dyestuffs, heavy metals and minimising certain other physiochemical parameters like TSS (total suspended solids, TDS (total dissolved solids, COD (chemical oxygen demand and BOD (biological oxygen demand in textile wastewater. Sorption kinetics through various models, factors influencing the biosorption capacity, and role of physical and chemical modifications in the water hyacinth are also discussed.

  1. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  2. Equipe de trabalho

    Directory of Open Access Journals (Sweden)

    Gabriel Gerber Hornink

    2014-08-01

    Full Text Available   Equipe de Trabalho 2014 1. Equipe editorial Editor-Chefe Bayardo Bapstista Torres, Instituto de Química - USP, Brasil Eduardo Galembeck, Departamento de Bioquímica Instituto de Biologia UNICAMP, Brasil   Editores Gabriel Gerber Hornink, Depto. Bioquímica, Instituto de Ciências Biomédicas, Universidade - Federal de Alfenas - Unifal-MG, Brasil Vera Maria Treis Trindade, Instituto de Ciências Básicas da Saúde, Departamento de Bioquímica, Universidade Federal do Rio Grande do Sul, Brasil   Corpo Editorial Adriana Cassina, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Angel Herráez, Departamento de Bioquímica y Biología molecular, Universidad de Alcalá de Henares, Madrid, Espanha André Amaral Gonçalves Bianco, Universidade Federal de São Paulo (Unifesp, Brasil Denise Vaz de Macedo, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Eneida de Paula, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Guilherme Andrade Marson, Instituto de Química - USP, Brasil Jose Antonio Martinez Oyanedel, Universidad de Concepción, Chile Josep Maria Fernández Novell, Dept. Bioquímica i Biologia Molecular Universitat de Barcelona, Espanha Leila Maria Beltramini, Instituto de Física de São Carlos, Universidade Estadual de São Paulo - USP, Brasil Manuel João da Costa, Escola de Ciências da Saúde, Universidade do Minho, Portugal Maria Lucia Bianconi, Instituto de Bioquímica Médica Universidade Federal do Rio de Janeiro (UFRJ, Brasil María Noel Alvarez, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Miguel Ángel Medina Torres, Department of Molecular Biology & Biochemistry Faculty of Sciences University of Málaga, Espanha Nelma Regina Segnini Bossolan, Instituto de Física de São Carlos, Universidade de São Paulo - USP, Brasil Paulo De Avila

  3. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  4. 49 CFR 176.905 - Motor vehicles or mechanical equipment powered by internal combustion engines.

    Science.gov (United States)

    2010-10-01

    ... of ignition. A motor vehicle or mechanical equipment showing any signs of leakage or electrical fault... equipment is stowed. (f) Each hold or compartment must be ventilated and fitted with an overhead water... smoke or fire detection system capable of alerting personnel on the bridge. (h) All electrical equipment...

  5. Additional Equipment for Soil Biodegradation

    Science.gov (United States)

    Vondráčková, Terezie; Kraus, Michal; Šál, Jiří

    2017-12-01

    Intensification of industrial production, increasing citizens’ living standards, expanding the consumer assortment mean in the production - consumption cycle a constantly increasing occurrence of waste material, which by its very nature must be considered as a source of useful raw materials in all branches of human activity. In addition to strict legislative requirements, a number of circumstances characterize waste management. It is mainly extensive transport associated with the handling and storage of large volumes of substances with a large assortment of materials (substances of all possible physical and chemical properties) and high demands on reliability and time coordination of follow-up processes. Considerable differences in transport distances, a large number of sources, processors and customers, and not least seasonal fluctuations in waste and strong price pressures cannot be overlooked. This highlights the importance of logistics in waste management. Soils that are contaminated with oil and petroleum products are hazardous industrial waste. Methods of industrial waste disposal are landfilling, biological processes, thermal processes and physical and chemical methods. The paper focuses on the possibilities of degradation of oil pollution, in particular biodegradation by bacteria, which is relatively low-cost among technologies. It is necessary to win the fight with time so that no ground water is contaminated. We have developed two additional devices to help reduce oil accident of smaller ranges. In the case of such an oil accident, it is necessary to carry out the permeability test of contaminated soil in time and, on this basis, to choose the technology appropriate to the accident - either in-sit biodegradation - at the site of the accident, or on-sit - to remove the soil and biodegrade it on the designated deposits. A special injection drill was developed for in-sit biodegradation, tossing and aeration equipment of the extracted soil was developed for

  6. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  7. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  8. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  9. The history and development of NASA survival equipment.

    Science.gov (United States)

    Radnofsky, M. I.

    1972-01-01

    A research and development program on survival equipment was begun in early 1960 with the Mercury Program. The Mercury survival kit is discussed together with Gemini survival equipment, and Apollo I survival equipment. A study program is conducted to assess potential survival problems that may be associated with future space flights landing in polar waters. Survival kit requirements for applications on the Skylab program are also considered. Other investigations are concerned with the design of a global survival kit in connection with Space Shuttle missions.

  10. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  11. EAS Equipment Authorization Grantee Registrations

    Data.gov (United States)

    Federal Communications Commission — EAS (Equipment Authorization System). Radio Frequency (RF) devices are required to be properly authorized under 47 CFR Part 2 prior to being marketed or imported...

  12. ENERGY STAR Certified Imaging Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 2.0 ENERGY STAR Program Requirements for Imaging Equipment that are effective as of...

  13. EMR Measurements on NDA Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Macdonell, Alexander Thomas [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meierbachtol, Krista Cruse [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Evans, James Walter Jr. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mayo, Douglas R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-10

    Electromagnetic radiation (EMR) emission strength measurements were performed on a suite of passive non-destructive assay (NDA) radiation detection equipment. Data were collected from 9 kHz up to 6 GHz on each of the assembled systems.

  14. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  15. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  16. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  17. Plant equipment integrity monitoring and diagnosing method and device therefor, plant equipment maintenance and inspection time determining method and device therefor, as well as nuclear power plant

    International Nuclear Information System (INIS)

    Kato, Takahiko; Ando, Masashi; Osumi, Katsumi; Horiuchi, Tetsuo; Asakura, Yamato; Akamine, Kazuhiko.

    1995-01-01

    The present invention can accurately forecast a time for occurrence of troubles of plant equipments in contact with recycling water, to conduct its maintenance and inspection before occurrence of the troubles. Namely, change of water quality in plant equipments caused by corrosion of recycling water occurred in constitutional parts of the plant equipments is measured. The time upon occurrence of the troubles of the plant equipments to corrosion of the recycling water is forecast based on the measured value. A time till the occurrence of the change of water quality after starting the use of the plant equipments is calculated based on the measured value. The calculated time is compared with a correlation between the time of occurrence of the troubles after starting the use of the plant equipments and the time of occurrence of change of the water quality, to forecast the time of occurrence of the troubles. Preferably, electroconductivity and pH of recycling water in the inside or at the exit of the plant equipments are measured as an object for the measurement of change of water quality. (I.S.)

  18. Electric Ground Support Equipment at Airports

    Energy Technology Data Exchange (ETDEWEB)

    2017-12-12

    Airport ground support equipment (GSE) is used to service airplanes between flights. Services include refueling, towing airplanes or luggage/freight carts, loading luggage/freight, transporting passengers, loading potable water, removing sewage, loading food, de-icing airplanes, and fire-fighting. Deploying new GSE technologies is a promising opportunity in part because the purchasers are generally large, technologically sophisticated airlines, contractors, or airports with centralized procurement and maintenance departments. Airlines could particularly benefit from fuel diversification since they are highly exposed to petroleum price volatility. GSE can be particularly well-suited for electrification because it benefits from low-end torque and has frequent idle time and short required ranges.

  19. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  20. Low level photoneutron detection equipment

    International Nuclear Information System (INIS)

    Ji Changsong; Zhang Yuqin; Li Yuansui

    1991-01-01

    A low level photoneutron detection equipment has been developed. The photoneutrons produced by interaction of 226 Ra gamma quanta and deutron (D) target are detected with n-n discrimination detector made up of 3 He proportional counter array. The D-content information in the target can be obtained from the measured photoneutron counts. The equipment developed is mainly used for nondestructive D-content measurement of D-devices

  1. FUSRAP equipment concept development study

    International Nuclear Information System (INIS)

    Hinerman, K.B.; Smith, R.E.

    1981-01-01

    Under DOE contract, Dalton-Dalton-Newport, Inc. is performing an engineering evaluation of three selected FUSRAP sites in an effort to generate equipment concepts to perform remedial action for retrieval, packaging, storing, and transporting contaminated soil and other debris. Along with this engineering evaluation, an analysis of state and Federal regulations was made which had significant impact on the selected equipment and costs for each remedial action concept

  2. Remotely operated replaceable process equipment

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment. (DG) [de

  3. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  4. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  5. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  6. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  7. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  8. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  9. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  10. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  11. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  12. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  13. Performance test of nutrient control equipment for hydroponic plants

    Science.gov (United States)

    Rahman, Nurhaidar; Kuala, S. I.; Tribowo, R. I.; Anggara, C. E. W.; Susanti, N. D.

    2017-11-01

    Automatic control equipment has been made for the nutrient content in irrigation water for hydroponic plants. Automatic control equipment with CCT53200E conductivity controller to nutrient content in irrigation water for hydroponic plants, can be used to control the amount of TDS of nutrient solution in the range of TDS numbers that can be set according to the range of TDS requirements for the growth of hydroponically cultivated crops. This equipment can minimize the work time of hydroponic crop cultivators. The equipment measurement range is set between 1260 ppm up to 1610 ppm for spinach plants. Caisim plants were included in this experiment along with spinach plants with a spinach plants TDS range. The average of TDS device is 1450 ppm, while manual (conventional) is 1610 ppm. Nutrient solution in TDS controller has pH 5,5 and temperature 29,2 °C, while manual is pH 5,6 and temperature 31,3 °C. Manually treatment to hydroponic plant crop, yields in an average of 39.6 grams/plant, greater than the yield of spinach plants with TDS control equipment, which is in an average of 24.6 grams / plant. The yield of caisim plants by manual treatment is in an average of 32.3 grams/crop, less than caisim crop yields with TDS control equipment, which is in an average of 49.4 grams/plant.

  14. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  15. Water curtain

    Energy Technology Data Exchange (ETDEWEB)

    Kutepov, A.I.; Fedotov, I.N.; Prokopov, O.I.

    1982-01-01

    The patented water curtain is used to eliminate gas-oil gushers and is distinguished by the fact that in order to simplify operation, the water-line collector is made out of two symmetrical parts installed with the possibility of relative rotation. The collector is equipped with at least one pipe arranged in the zone of the collector and has openings for the supply of water.

  16. Waste Electrical and Electronic Equipment

    DEFF Research Database (Denmark)

    Bigum, Marianne Kristine Kjærgaard; Christensen, Thomas Højlund

    2011-01-01

    Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans and the env......Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans...

  17. The development of superconducting equipment

    CERN Document Server

    Ueda, T; Hiue, H

    2003-01-01

    Fuji Electric has been developing various types of superconducting equipment for over a quarter of a century. This paper describes the development results achieved for superconducting equipment and especially focuses on large-capacity current leads and superconducting transmission systems, the development of which is being promoted for application to the field of nuclear fusion. High temperature superconductor (HTS) is becoming the mainstream in the field of superconductivity, and the HTS floating coil and conduction-cooled HTS transformed are also introduced as recent developments for devices that utilize this technology. (author)

  18. Seismic qualification of equipment by means of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Azarm, M.A.; Farahzad, P.; Boccio, J.L.

    1982-01-01

    Upon the sponsorship of the Equipment Qualification Branch (EQB) of NRC, Brookhaven National Laboratory (BNL) has utilized a risk-based approach for identifying, in a generic fashion, seismically risk-sensitive equipment. It is anticipated that the conclusions drawn therefrom and the methodology employed will, in part, reconcile some of the concerns dealing with the seismic qualification of equipment in operating plants. The approach taken augments an existing sensitivity analysis, based upon the WASH-1400 Reactor Safety Study (RSS), by accounting for seismicity and component fragility with the Kennedy model and by essentially including the requisite seismic data presented in the Zion Probabilistic Safety Study (ZPSS). Parametrically adjusting the seismic-related variables and ascertaining their effects on overall plant risk, core-melt probability, accident sequence probability, etc., allows one to identify those seismically risk-sensitive systems and equipment. This paper describes the approach taken and highlights the results obtained thus far for a hypothetical pressurized water reactor

  19. A comparison between three inspection techniques on a sub sea pipeline in Campos Basin; Comparacao do resultado de tres tecnicas de inspecao com pigs instrumentados em um mesmo oleoduto da Bacia de Campos

    Energy Technology Data Exchange (ETDEWEB)

    Franzoi, Aldo Renato; Bueno, Sergio Ibaje Oliveira; Camerini, Claudio S; Marinho, Carla; Nazario, Fabiana [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Freitas, Miguel; Weid, Jean Pierre von der [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The PPG-1/PGP-1 crude pipeline links Pargo and Garoupa platforms at the Campos Basin. Garoupa process the crude removing water and transferring it to the coast. During 10 years this pipeline had operated with more than 20% of water. In 2001, the pipeline was surveyed with a MFL pig. The results showed internal corrosion in almost the entire 22 inches pipeline concentrated on its bottom part (channeling corrosion). This type of indication has a high difficult on sizing using MFL tools. The logistic to replace the damaged pipeline was started but before that, the pipeline was surveyed with a US pig to improve the sizing of all defects. The results of the US pig confirmed the MFL report and were decided to keep all tasks in order to replace the corroded segment. At that time, a new inspection pig was under development on PETROBRAS Research Center in cooperation with PUC-Rio/CETUC. It was decided run this tool in that pipeline to compare its results against the two most common methods used for pipelines inspections. (author)

  20. Damage limits of accelerator equipment

    CERN Document Server

    Rosell, Gemma

    2014-01-01

    Beam losses occur in particle accelerators for various reasons. The effect of lost particles on accelerator equipment becomes more severe with the increasing energies and intensities. The present study is focused on the damage potential of the proton beam as a function of particle energy and beam size. Injection and extraction energies of different accelerators at CERN were considered.

  1. Pocket dictionary of laboratory equipment

    International Nuclear Information System (INIS)

    Junge, H.D.

    1987-01-01

    This pocket dictionary contains the 2500 most common terms for scientific and technical equipment in chemical laboratories. It is a useful tool for those who are used to communicating in German and English, but have to learn the special terminology in this field. (orig.) [de

  2. Using Gaming Equipment to Teach

    Science.gov (United States)

    Curriculum Review, 2009

    2009-01-01

    Gaming equipment (such as Nintendo's Wii[TM]) is making its way to schools and classrooms. However, most of the discussion regarding how to use this technology and integrate it into lesson plans is happening in blogs on the Internet. An advocate of interactive media in the classroom, Dr. Dawn Hawkins, a faculty member for the Art Institute of…

  3. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  4. Hydraulic turbines and auxiliary equipment

    Energy Technology Data Exchange (ETDEWEB)

    Luo Gaorong [Organization of the United Nations, Beijing (China). International Centre of Small Hydroelectric Power Plants

    1995-07-01

    This document presents a general overview on hydraulic turbines and auxiliary equipment, emphasizing the turbine classification, in accordance with the different types of turbines, standard turbine series in China, turbine selection based on the basic data required for the preliminary design, general hill model curves, chart of turbine series and the arrangement of application for hydraulic turbines, hydraulic turbine testing, and speed regulating device.

  5. Leakage monitoring equipment of fuel element by delayed neutron method

    International Nuclear Information System (INIS)

    Ji Changsong; Zhang Shulan; Zhang Shuheng

    1999-01-01

    Based on monitoring results of delayed neutrons from reactor first circle water, the leakage of reactor fuel elements is monitored. A monitoring equipment consisted of an array of 3 He proportional counter tubes with 75 s delay has been developed. The neutron detection efficiency of 6.1% is obtained

  6. Variable Temperature Equipment for a Commercial Magnetic Susceptibility Balance

    Science.gov (United States)

    Lotz, Albert

    2008-01-01

    Variable temperature equipment for the magnetic susceptibility balance MSB-MK1 of Sherwood Scientific, Ltd., is described. The sample temperature is controlled with streaming air heated by water in a heat exchanger. Whereas the balance as sold commercially can be used only for room temperature measurements, the setup we designed extends the…

  7. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  8. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  9. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  10. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  11. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  12. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  13. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  14. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  15. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  16. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  17. Prevention measures for avoiding unexpected drifting of marine component in recovery equipment of significant metals from sea water. Positioning and monitoring system for marine component and improvement of its positioning accuracy

    Energy Technology Data Exchange (ETDEWEB)

    Tamada, Masao; Kasai, Noboru; Seko, Noriaki; Hasegawa, Shin; Takeda, Hayato; Katakai, Akio; Sugo, Takanobu [Japan Atomic Energy Research Inst., Takasaki, Gunma (Japan). Takasaki Radiation Chemistry Research Establishment; Kawabata, Yukiya [Ebara Reseach Co., Ltd., Fujisawa, Kanagawa (Japan); Onuma, Kenji [Mitsubishi Materials Corp., Tokyo (Japan)

    2001-11-01

    Positioning and monitoring system for marine component in recovery equipment of significant metals from seawater with adsorbent was designed and assembled to avoid unexpected drifting accident. This system which was set on float part of the marine component obtains the positioning data from GPS satellites and sends them to Takasaki and Mutsu establishments through satellite communication. In both establishments, the position data were shown in computer displays. As characteristic test for 20 days in the real sea, 262 data were obtained every 2 hours. The twice of the distance root mean square (2DRMS) was 223.7 m. To improve this performance, three new functions were added to the present firmware. There are to raise positioning resolutions in longitude and latitude from 0.001 to 0.00001 degree, to remove the reflection of GPS signal from sea surface, and to average remaining three positioning data after maximum and minimum data were omitted from continuous five positioning data. The improved system shows the 2DRMS positioning of 15.5 m. This performance is enough to prevent marine component from its drifting accident. (author)

  18. Guidelines for nuclear reactor equipments safety-analysis

    International Nuclear Information System (INIS)

    1978-01-01

    The safety analysis in approving the applications for nuclear reactor constructions (or alterations) is performed by the Committee on Examination of Reactor Safety in accordance with various guidelines prescribed by the Atomic Energy Commission. In addition, the above Committee set forth its own regulations for the safety analysis on common problems among various types of nuclear reactors. This book has collected and edited those guidelines and regulations. It has two parts: Part I includes the guidelines issued to date by the Atomic Energy Commission: and Part II - regulations of the Committee. Part I has collected 8 categories of guidelines which relate to following matters: nuclear reactor sites analysis guidelines and standards for their applications; standard exposure dose of plutonium; nuclear ship operation guidelines; safety design analysis guidelines for light-water type, electricity generating nuclear reactor equipments; safety evaluation guidelines for emergency reactor core cooling system of light-water type power reactors; guidelines for exposure dose target values around light-water type electricity generating nuclear reactor equipments, and guidelines for evaluation of above target values; and meteorological guidelines for the safety analysis of electricity generating nuclear reactor equipments. Part II includes regulations of the Committee concerning - the fuel assembly used in boiling-water type and in pressurized-water type reactors; techniques of reactor core heat designs, etc. in boiling-water reactors; and others

  19. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  20. [Legionella pneumonia after the use of CPAP equipment].

    Science.gov (United States)

    Stolk, Jaap M; Russcher, Anne; van Elzakker, Erika P M; Schippers, Emile F

    2016-01-01

    Continuous positive airway pressure (CPAP) equipment can be colonised by Legionellae and might cause Legionella pneumonia in the user. However, there is no reported case of Legionella pneumonia related to CPAP equipment in which an identical Legionella was found in both the patient and the CPAP equipment. A 51-year-old man came to the Emergency Department with fever, confusion and dyspnoea that had been present for 3 days. His medical history included obstructive sleep apnoea, for which he had been using CPAP therapy at home for 10 weeks. The CPAP equipment showed signs of poor maintenance. Chest X-ray revealed a pulmonary consolidation. Laboratory investigation resulted in a positive urine antigen test for Legionella. Water from the CPAP equipment and sputum from the patient revealed Legionella pneumophila. Serotyping and sequence-based typing showed an identical L. pneumophila serotype 1 ST37. It is important to be aware that CPAP equipment can be colonised with Legionellae and might cause Legionella pneumonia. It is therefore necessary to ask about CPAP therapy in a patient with community-acquired pneumonia.

  1. [Equipment and technology in robotics].

    Science.gov (United States)

    Murphy, Declan; Challacombe, Ben; Nedas, Tim; Elhage, Oussama; Althoefer, Kaspar; Seneviratne, Lakmal; Dasgupta, Prokar

    2007-05-01

    We review the evolution and current status of robotic equipment and technology in urology. We also describe future developments in the key areas of virtual reality simulation, mechatronics and nanorobotics. The history of robotic technology is reviewed and put into the context of current systems. Experts in the associated fields of nanorobotics, mechatronics and virtual reality simulation simulation review the important future developments in these areas.

  2. Margins related to equipment design

    International Nuclear Information System (INIS)

    Devos, J.

    1994-01-01

    Safety margins related to design of reactor equipment are defined according to safety regulations. Advanced best estimate methods are proposed including some examples which were computed and compared to experimental results. Best estimate methods require greater computation effort and more material data but give better variable accuracy and need careful experimental validation. Simplified methods compared to the previous are less sensitive to material data, sometimes are more accurate but very long to elaborate

  3. Temperature radiation measuring equipment. Temperaturstrahlungsmessgeraet

    Energy Technology Data Exchange (ETDEWEB)

    Lotzer, W

    1981-01-22

    The invention is concerned with a temperature radiation measuring equipment for non-contact temperature measurement by the light intensity variation method, with a photoelectric resistance as the measuring element. By having a circuit with a transistor, the 'dark resistance' occurring in the course of time is compensated for and thus gives a genuine reading (ie. the voltage drop across the photoelectric resistance remains constant).

  4. CERN computing equipment for Senegal

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On 26 May, CERN once again had the honour of donating computing equipment to a foreign institute.   This time, around 100 servers and five network hubs were sent to Senegal, making it the seventh country, after Morocco, Ghana, Bulgaria, Serbia, Egypt and the Philippines, to receive a donation of computing equipment from the Organization. The official ceremony was held at CERN on 26 May in the presence of the Director-General, Rolf Heuer, and Senegal's ambassador to Geneva, Fodé Seck, who both expressed their enthusiasm for the project. The equipment is intended for Cheikh Anta Diop University (UCAD) in Dakar and will be of particular use to students attending the African School of Fundamental Physics and its Applications (ASP 2014) taking place from 3 to 23 August, for which CERN is a partner. The ASP allows a large number of African students to hone their skills in high-energy physics and to forge professional links with fellow physicists in Africa and Europe. ...

  5. JCE Online: Equipment Buyers Guide

    Science.gov (United States)

    Holmes, Jon L.

    1999-01-01

    The Equipment Buyers Guide was edited by Jo Rita Jordan. The new Equipment Buyers Guide, bound into the back of this issue, is also a new resource of JCE Internet. This resource provides an online source for the information contained in the printed guide. Placing this information online allows us to regularly update it and to provide live links to the suppliers' WWW sites. The organization of the online version parallels that of the print version. There is an alphabetical list of suppliers and a categorical listing. Links to these lists are provided on every page in the left-hand navigation bar. To quickly find information about a particular supplier, you click Supplier List, click the letter that begins the supplier's name, and scroll through the list to find the supplier. To find which suppliers provide a particular type of instrument or equipment, use the Categories link; click the category of the equipment you are looking for and then click the link to a supplier. You will then be taken to an alphabetical supplier listing page where you can scroll until you find the particular supplier of the item for which you are looking. Once you have found a supplier, the online Equipment Buyers Guide gives you the traditional contact information. But in addition, you also get one-click access to the WWW sites of the suppliers that have them. Depending on the site, you should be able to find information about the items that you seek and may even be able to order the items online! We think that you will find the online version of the Equipment Buyers Guide useful. To make it more useful, please send your suggestions, any errors or omissions you find, and any additional categories to the editor at jjordan@world.std.com The online Equipment Buyers Guide can be found at JCE Online at http://JChemEd.chem.wisc.edu/JCEWWW/Resources/EBG/ JCE Online in '99 JCE Online is your online source of "all things JCE". In order to provide you with an even more useful online resource, JCE

  6. Division of Scientific Equipment - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2002-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: * designs of devices and equipment for experiments in physics; their mechanical construction and assembly. In particular, these are vacuum chambers and installations for HV and UHV;* maintenance and upgrading of the existing installations and equipment in our Institute; * participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and an A0 plotter, which allow us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop offers a wide range of machining and treatment methods with satisfactory tolerances and surface quality. They include: * turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc type elements of a diameter up to 600 mm and a length not exceeding 300 mm, * milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm, * grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm, * drilling - holes of a diameter up to 50 mm, * welding - electrical and gas welding, including TIG vacuum-tight welding, * soft and hard soldering, * mechanical works including precision engineering, * plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides, * painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop is equipped with the CNC milling machine which can be used for machining of work pieces up to 500 kg. The machine

  7. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  8. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  9. The choice of homogenisation equipment affects lipid oxidation in emulsions

    DEFF Research Database (Denmark)

    Horn, Anna Frisenfeldt; Nielsen, Nina Skall; Jensen, Louise Helene Søgaard

    2012-01-01

    in emulsions has been shown to be affected by the emulsification conditions. The objective of this study was to investigate the influence of homogenisation equipment (microfluidizer vs. two-stage valve homogeniser) on lipid oxidation in 10% fish oil-in-water emulsions prepared with two different milk proteins....... Emulsions were prepared at pH 7 with similar droplet sizes. Results showed that the oxidative stability of emulsions prepared with sodium caseinate was not influenced by the type of homogeniser used. In contrast, the type of homogenisation equipment significantly influenced lipid oxidation when whey protein...

  10. Desarrollo de membranas de quitosano y diseño de un equipo para la eliminación de metales pesados del agua Chitosan membrane development and design of equipment for the removal of heavy metals from water

    Directory of Open Access Journals (Sweden)

    Jesús Mora Molina

    2012-11-01

    Full Text Available El presente estudio comparó la eficiencia de la filtración con membranas de quitosano 1,75% m/v, entrecruzadas con glutaraldehído (0,08% m/v y sin entrecruzar, para estimar la capacidad de remoción de iones de cadmio, cromo y cobre de disoluciones modelo. Además, se diseñó un equipo de bajo costo para la experimentación con las membranas elaboradas. La finalidad de la investigación era emplear materiales biodegradables para remover metales pesados de aguas, mediante una técnica de bajo consumo energético y, por otra parte, generar soluciones baratas, efectivas y aplicables a problemas específicos. Se elaboraron dos fichas técnicas con información sobre las membranas y se encontró que el cromo fue el metal removido en mayor medida por las membranas entrecruzadas, ajustándose al modelo de isoterma de Freundlich. Sin embargo, no se encontró relación entre el tamaño de poro de las membranas y el grado de entrecruzamiento.A filtration technique with 1,75% m/v chitosan membranes crosslinked with glutaraldehyde (0,08% v/v was used to quantify the removal capacity of chromium, copper and cadmium ions from water. A simple and low cost filtration system was developed to use with prepared membranes.The main goal was to use biodegradable materials for removing heavy metals from water, through a low energy consumption, cheap, and specific method.As a result, two data sheets were prepared for the membranes. It was found out that chromium was the metal with the highest removal from water, by using a crosslinked membrane. Metal adsorption was best adjusted to the Freundlich isotherm model, better than Langmuir isotherm model.However, it was found no correlation between pore size and crosslinking degree.

  11. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2001-01-01

    Full text: The activity of ZdAJ in 2000 was focused on realisation of the Government-Ordered Project - 6/15 MeV Accelerator. The realisation was accomplished in two stages: - stage I should result in deriving principal operational parameters of the accelerator - stage 2 will result in full implementation of the control system providing optimum control of the equipment and automatic maintaining of its parameters. Within the frames of the first stage, a klystron modulator panel was finished and the design documentation of the mechanical supporting structure, the arm, accelerating structure, collimator and control panel were advanced. Manufacturing of the above sub-units in the workshop has started. In the frames of the Specific Project of the State Committee for Scientific Research, the improvement of Neptun lOPC accelerator was undertaken. The read-out of the monitor dose with atmospheric pressure and ambient temperature compensation has been introduced. New filters for equalising the photon and electron beam and new wedge filters have been designed. Changes in programming have been introduced, which improve the patient's safety by eliminating possible personnel errors and increase the accuracy of radiation fields read-out. In 2000 ZdAJ progressed in development of the Quality System conforming EN-ISO 9001 Standard by including the provisions of EN 46001 Standard. The Standard EN 46001: ''Quality Systems - Medical Equipment''. Detailed requirements related to application of EN ISO 9001 is an European Quality Standard extending the provisions of EN ISO 9001 Standard over the manufacturers of medical equipment. (author)

  12. Reactor vital equipment determination techniques

    International Nuclear Information System (INIS)

    Bott, T.F.; Thomas, W.S.

    1983-01-01

    The Reactor Vital Equipment Determination Techniques program at the Los Alamos National Laboratory is discussed. The purpose of the program is to provide the Nuclear Regulatory Commission (NRC) with technical support in identifying vital areas at nuclear power plants using a fault-tree technique. A reexamination of some system modeling assumptions is being performed for the Vital Area Analysis Program. A short description of the vital area analysis and supporting research on modeling assumptions is presented. Perceptions of program modifications based on the research are outlined, and the status of high-priority research topics is discussed

  13. New subsea X tree generation brings innovative features providing efficiency for ultra deep waters

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Gustavo Bellot de Almeida; Labes, Alan Zaragoza [FMC Technologies, Houston, TX (United States)

    2008-07-01

    The EVDT has been developed for global applications. Based upon the widely field proven 10 K Vertical Tree and 15 K HPHT Tree, the system has incorporated the latest technological advancements. The Tubing Hanger System and installation tooling are available up to a 7 inch bore for 10,000 psi applications and a 5 inch bore for 15,000 psi applications. The Tubing Hanger can be installed using a Tubing Head when flexibility for sequencing of events is required during offshore installations. Or it can simply land into the wellhead, eliminating the Tubing Head. This allows for a more efficient installation when completion and drilling operations are conducted without retrieving the Sub sea Blow Out Preventer (BOP) and Riser. The EVDT incorporates a retrievable Flow Module downstream of the wing valve that can be configured to project specific variances such as production, gas injection and water injection service. The Flow Module can also be configured to include Multi-Phase Flow Meters, sensors, and gauges. This allows an upgrade sub sea without having to pull and re-run the entire Tree system. These features allowed the system to hit the mark regarding what the industry needs today and also allowed to accommodate technologies that will arise in the years to come. (author)

  14. BH2201 type leakage monitoring equipment of reactor fuel elements

    International Nuclear Information System (INIS)

    Ji Changsong; Dai Zhude; Xie Liangnian; Zhang Shulan; Zhang Shuheng

    1999-01-01

    A high-sensitive equipment monitoring leakage of the reactor fuel elements has been developed. The delayed neutrons emitted from fission product-pioneer nucleus are monitored in the 1st circle water. An array of 3 He proportional counter tubes is designed as a neutron detector for delayed neutrons, the detection geometry of which is near to 4π. In order to reduce the influence of interference factors the monitoring of fission product is carried out with 75s delay. The 87 Br delayed neutron pioneer nucleus is chosen as a monitoring object. The neutron detection efficiency of the developed equipment is 6.1%, which is 3 times higher than one of all available advanced equipment of the same function both at home and abroad

  15. The replace repair decision for heavy equipment.

    Science.gov (United States)

    2004-01-01

    The fleet of equipment operated by the Virginia Department of Transportation (VDOT) constitutes a large investment, on the order of half a billion dollars. A means of identifying earlier and more accurately those pieces of equipment whose timely repl...

  16. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  17. Musical Sound, Instruments, and Equipment

    Science.gov (United States)

    Photinos, Panos

    2017-12-01

    'Musical Sound, Instruments, and Equipment' offers a basic understanding of sound, musical instruments and music equipment, geared towards a general audience and non-science majors. The book begins with an introduction of the fundamental properties of sound waves, and the perception of the characteristics of sound. The relation between intensity and loudness, and the relation between frequency and pitch are discussed. The basics of propagation of sound waves, and the interaction of sound waves with objects and structures of various sizes are introduced. Standing waves, harmonics and resonance are explained in simple terms, using graphics that provide a visual understanding. The development is focused on musical instruments and acoustics. The construction of musical scales and the frequency relations are reviewed and applied in the description of musical instruments. The frequency spectrum of selected instruments is explored using freely available sound analysis software. Sound amplification and sound recording, including analog and digital approaches, are discussed in two separate chapters. The book concludes with a chapter on acoustics, the physical factors that affect the quality of the music experience, and practical ways to improve the acoustics at home or small recording studios. A brief technical section is provided at the end of each chapter, where the interested reader can find the relevant physics and sample calculations. These quantitative sections can be skipped without affecting the comprehension of the basic material. Questions are provided to test the reader's understanding of the material. Answers are given in the appendix.

  18. Concerning equipment procurement for NPPs

    International Nuclear Information System (INIS)

    Pana, N.

    2002-01-01

    After a stagnation in investments for nuclear power which extended over a period of 10-15 years, assessments done by energy forecast institutes, as well as, evaluations by UE institutions, OECD, and DOE (USA) point to the conclusion solid and argued that the electric energy of nuclear origin will record a new boost beginning probably with the year 2005. Particular efforts were concentrated upon improving the performances of existing plants and, on the other hand, towards new, evolutionary concepts in nuclear engineering. Advanced equipment for nuclear reactors and plants resulted and were already implemented. In Europe construction of both advanced PWR and BWR type reactors are underway. The paper consider the issues of Romanian nuclear power and presents the prospects for advanced CANDU reactors in connection with the Romania's infrastructure and necessities. The problem of modernizing the equipment and components for NPP is discussed in the context of financing and investment conditions. In conclusion, the share of nuclear power in Romania is expected to rise in order to compensate the decline in fossil fuel thermal power and to better solve the environmental issues

  19. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  20. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  1. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  2. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  3. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  4. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  5. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  6. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  7. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  8. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  9. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  10. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  11. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  12. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  13. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  14. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  15. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  16. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  17. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  18. Fire prevention and protection for trackless equipment

    Energy Technology Data Exchange (ETDEWEB)

    Burger, A.J.

    1988-10-01

    With the increased use of trackless diesel and electrical equipment underground, the fire danger associated with this equipment has increased. The need for adequate fire prevention and protection on all aspects of trackless mechanised mining must be taken into consideration. This paper describes briefly the causes of fires on trackless equipment and the precautions taken to reduce the risk of ignition. 1 tab.

  19. Load Bearing Equipment for Bone and Muscle

    Science.gov (United States)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  20. Experience in the manufacture of nuclear equipment in India

    International Nuclear Information System (INIS)

    Challappa, S.; Murthy, G.S.K.; Mehta, S.K.; Kakodkar, A.; Natarajan, A.

    1977-01-01

    Department of Atomic Energy with its programme for achieving self-sufficiency was involved in engineering, manufacture, inspection, performance testing and quality surveillance of major precision and critical equipment such as reactor vessels, shields, fuelling machines, coolant channel components etc. etc. high pressure equipment for Heavy Water Plants, specialized components for Fuel Complex, major equipment for Cyclotron Project and various research projects. These had to be manufactured at various shops in the country depending upon the availability of machines. The relative importance of various important parameters associated with the manufacture of this equipment were assessed in a separate R and D programme. This has helped in re-designing in some areas to suit the manufacture under Indian conditions. Assessment of any marginal variations that take place during manufacture was also possible because of the availability of data of this kind. Critical components and equipment are tested for their performance under simulated conditions before shipments. B.A.R.C. has contributed immensely in achieving the self-sufficiency and also for designs for future plants

  1. Establishment for Nuclear Equipment -Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2006-01-01

    Research and development works conducted in the Establishment for Nuclear Equipment (ZdAJ) were focused around 3 subject areas: an accelerator for cancer treatment, therapeutical tables, systems and methods for controlling objects that cross international borders. The new, medium energy accelerator for cancer therapy cases is being designed in the Establishment for several years. In 2005 progress was achieved. A physical part, containing an electron beam has been completed and the parameters of that beam make it useful for therapeutical purposes. Consequently, the work on designing and testing of beam control systems, ensuring its high stability, repetition of irradiation parameters and accuracy of dosage have been started. Results of these tests make it very probable that 2006 will be the final year of scientific works and in 2007 the new apparatus will be ready for sales. Therapeutical tables have become a leading product of ZdAJ IPJ. Their technical parameters, reliability and universality in uses are appreciated by many customers of ZdAJ. In 2005, the table Polkam 16 was registered by the national Office for Registration of Medical Equipment as the first product of ZdAJ that meets all technical and formal requirements of the safety mark CE. This allows sales of the product on the market of the European Union. The research and development part of designing a therapeutical table for uses in the total body irradiation technique was also concluded in 2005. After the September 11 terrorist attacks on WTC a matter of controlling international borders have become a priority for many countries. In 2005 in ZdAJ IPJ, we conducted many preliminary calculations and experiments analyzing systems of irradiation sources, both photon and neutron as well as systems of detection and designing of signals triggered by controlling objects crossing the border. The results so far have enabled us to formulate a research project which has been positively evaluated by experts and found

  2. Communication equipment radiation resistance ensurance

    International Nuclear Information System (INIS)

    Myrova, L.O.; Chelizhenko, A.Z.

    1983-01-01

    A review of works on radiation resistance of electronic equipment (epsilon epsilon) for 15 years is presented. The effect of ionizing radiation appearing as a result of nuclear explosions in nuclear facilities and in outerspace on epsilon epsilon has been considered. Types of radiation effects in epsilon epsilon, radiation effect on semiconductor devices and integrated circUits, types of epsilon epsilon failures, as well as the procass of radiation-resistant epsilon epsilon designing and selection of its main parameters have been described. The methods of epsilon epsilon flowsheet optimization, application of mathematical simulation and peculiarities of ensurance of epsilon epsilon radiation resistance of communication systems are considered. Peculiarities of designing of radiation-resistant quartz generators, secondary power supply sources and amplifiers are discussed

  3. Purex: process and equipment performance

    International Nuclear Information System (INIS)

    Orth, D.A.

    1986-01-01

    The Purex process is the solvent extraction system that uses tributyl phosphate as the extractant for separating uranium and plutonium from irradiated reactor fuels. Since the first flowsheet was proposed at Oak Ridge National Laboratory in 1950, the process has endured for over 30 years with only minor modifications. The spread of the technology was rapid, and worldwide use or research on Purex-type processes was reported by the time of the 1955 Geneva Conference. The overall performance of the process has been so good that there are no serious contenders for replacing it soon. This paper presents: process description; equipment performance (mixer-settlers, pulse columns, rapid contactors); fission product decontamination; solvent effects (solvent degradation products); and partitioning of uranium and plutonium

  4. Automation of a thermogravimetric equipment

    International Nuclear Information System (INIS)

    Mussio, L.; Castiglioni, J.; Diano, W.

    1987-01-01

    A low cost automation of some instruments by means of simple electronic circuits and a microcomputer Apple IIe. type is discussed. The electronic circuits described are: a) a position detector including phototransistors connected as differential amplifier; b) a current source that, using the error signal of the position detector, changes the current through the coil of an electromagnetic balance to restore its zero position; c) a proportional temperature controller, zero volt switching to drive a furnace to a desired temperature; d) an interface temperature regulator-microcomputer to control the temperature regulator by software; e) a multiplexer for an analog input of a commercial interface. Those circuits are applied in a thermogravimetric equipment used also for vapours adsorption. A program in block diagram form is included and is able to record change of mass, time, furnace temperature and to drive the temperature regulator in order to have the heating rates or the temperature plateaux needed for the experiment. (author) [pt

  5. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2000-01-01

    Full text: The main objective of the activity of the Establishment for Nuclear Equipment (ZdAJ) in 1999 was to obtain the ISO 9001 certificate. Work on this problem has been successfully completed. The changes introduced in agreement with requirements of ISO in supervising the construction, manufacturing and servicing eliminate possible deficiencies of our products and will pay in the future. Two new important ventures have been undertaken: design of an accelerator with two photon energies and a reconstruction of simulator directed towards better geometrical parameters. The completion of the improvements in accelerator is foreseen for the year 2002. The changes comprise almost all sub-assemblies of the device. The modernized simulator will be installed in the hospital already in the year 2000 - the ameliorations concern mainly the arm of the apparatus, collimator, driving gears and control system. Of course - apart from this, the routine production activity of the Establishment was continued in 1999. (author)

  6. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  7. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  8. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  9. Abrasive water jet cutting

    International Nuclear Information System (INIS)

    Leist, K.J.; Funnell, G.J.

    1988-01-01

    In the process of selecting a failed equipment cut-up tool for the process facility modifications (PFM) project, a system using an abrasive water jet (AWJ) was developed and tested for remote disassembly of failed equipment. It is presented in this paper

  10. Survey of Current Best Practices for Diving in Contaminated Water

    National Research Council Canada - National Science Library

    Steigleman, W

    2002-01-01

    .... Navy divers operating in contaminated water. This survey attempted to identify the current best practices and equipment for diving in contaminated water, including personal protective equipment as well as hazard identification, diver training...

  11. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  12. Study of National Electric System equipment until 2000 year

    International Nuclear Information System (INIS)

    1980-01-01

    The report by the German firm Lahmeyer International is about the historical development of the supply of Electric Power, description of the current system, previous studies, organization, power plants, hydroelectric plants and existing construction, transmission system, hydrological studies and water resources, operation of hydro thermal generation, medium-term demand, energy sources and generation in the medium term, list of thermal plants, evaluation of alternative equipment plans in Uruguay at a med dium term.

  13. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  14. Meeting the flow assurance challenges of deep water developments - from CAPEX development to field start up

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, M.M.; Feasey, N.D. [National Aluminium Company Ltd. (Nalco), Cheshire (United Kingdom); Afonso, M.; Silva, D. [NALCO Brasil Ltda., Sao Paulo, SP (Brazil)

    2008-07-01

    As oil accumulations in easily accessible locations around the world become less available developments in deeper water become a more common target for field development. Deep water projects, particularly sub sea development, present a host of challenges in terms of flow assurance and integrity. In this paper the focus will be on the chemical control of flow assurance challenges in hydrate control, scale control and wax/asphaltene control within deep water (>750 meter) developments. The opportunities for kinetic hydrate control vs. conventional thermodynamic hydrate control will be outlined with examples of where these technologies have been applied and the limitations that still exist. The development of scale control chemical formulations specifically for sub sea application and the challenges of monitoring such control programs will be highlighted with developments in real time and near real time monitoring. Organic deposit control (wax/asphaltene) will focus on the development of new chemicals that have higher activity but lower viscosity than currently used chemicals hence allowing deployment at colder temperatures and over longer distances. The factors that need to be taken into account when selecting chemicals for deep water application will be highlighted. Fluid viscosity, impact of hydrostatic head on injectivity, product stability at low temperature and interaction with other production chemicals will be reviewed as they pertain to effective flow assurance. This paper brings learning from other deep water basins with examples from the Gulf of Mexico, West Africa and Brazil, which will be used to highlight these challenges and some of the solutions currently available along with the technology gaps that exist. (author)

  15. Restoration to serviceability of Bruce 'A' heat transfer equipment

    International Nuclear Information System (INIS)

    Gammage, D.; Machowski, C.; McGillivray, R.; Durance, D.; Kazimer, D.; Werner, K.

    2009-01-01

    Bruce Units 1 to 4 were shut down during the 1990s by the former Ontario Hydro, due in part to a long list of system and equipment deficiencies and concerns, including steam generator tube degradation as a consequence of the then-existing steam generator secondary side water chemistry conditions. Upon its creation in 2001, and following a program of condition assessment, Bruce Power was able to determine that Units 3 and 4 could return to service; but that Units 1 and 2 would require refurbishment. That Refurbishment Program, which is currently well advanced, included the re-assessment of the condition of equipment throughout the plant including the heat transfer equipment; and determination item-by-item as to what inspection, cleaning, repair, or even replacement would be required to put the equipment into a condition where it could be expected to operate reliably for the additional 30 years expected from the plant. Clearly the objective is to suitably restore the equipment to serviceability without doing more refurbishment work than is warranted - without replacing equipment except where absolutely necessary. The first task in such a program is determination of its scope - i.e. a listing of all heat exchangers. That list included everything from the steam generators (which required replacement, now completed), to much smaller heat exchangers in the heavy water upgrader systems (which were found to be in very good overall condition). There is also a very large number of other so-called 'balance-of-plant' heat exchangers; these include the maintenance coolers, moderator heat exchangers, shutdown coolers and a whole raft of smaller coolers - many of which are cooled directly by lake water with its potential for bio-fouling and 'BIC' (Biologically Induced Corrosion). This paper focuses primarily on the engineering assessment, inspection, repair and general refurbishment of the balance-of-plant heat exchangers. As will be discussed in the paper, the assessment of the

  16. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  17. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  18. Engineering Water Analysis Laboratory Activity.

    Science.gov (United States)

    Schlenker, Richard M.

    The purposes of water treatment in a marine steam power plant are to prevent damage to boilers, steam-operated equipment, and steam and condensate lives, and to keep all equipment operating at the highest level of efficiency. This laboratory exercise is designed to provide students with experiences in making accurate boiler water tests and to…

  19. Inspection device for buried equipment

    International Nuclear Information System (INIS)

    Hanawa, Jun.

    1994-01-01

    In an inspection device for a buried equipment, a rail is suspended at the upper portion of a vessel of a pit-vessel type pump buried in a plant building floor, and a truck movable vertical in the vessel along the rail, and an ultrasonic wave probe contained in the truck and urged to the vessel by an electromagnet are disposed. In addition, an elevator moving vertically along a shaft is disposed, and an arm having the ultrasonic probe disposed at the end portion and driven by a piston are disposed to the elevator. The ultrasonic wave probe moves vertically together with the truck along the rail in the vessel while being urged to the vessel by the electromagnet to inspect and measure the state at the inner and outer surfaces of the vessel. Further, the length of the arm is controlled so as to set a predetermined distance between the ultrasonic wave probe and the vessel. Subsequently, the elevator is moved vertically along a shaft passing through a shaft hole of a mount, and the shaft is rotated thereby enabling to inspect and measure the state of the inner and outer surfaces of the vessel. (N.H.)

  20. Equipment used in nuclear medicine

    International Nuclear Information System (INIS)

    Das, B.K.; Noreen Norfaraheen Lee Abdullah

    2012-01-01

    Detection of radiation is the common purpose of all equipment's and instruments used in radioisotope laboratories. The first and most important instrument that was used in nuclear medicine was Geiger tube developed by H.W. Geiger as early in 1908. He in association with Mueller developed the so called Geiger-Muller tube (GM tube) which could be used to detect beta and gamma radiations. In spite of its severe limitations, GM tube remained the only external counting device until 1949. In 1948, Kallman reported that the scintillations can be detected and amplified with the help of photomultiplier tubes (PMTs). In comparison with gas filled detectors, scintillation detectors have two principal advantages that augment their use in nuclear medicine. Firstly, they are capable of much higher counting rates because of fast resolving times and secondly, because they are much more efficient for gamma ray detection. The scintillation detector is the most basic block of any modern radioisotope detection instrument like rate meter, counter, scanner, gamma camera or single photon emission computed tomography. (author)

  1. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  2. Materials division facilities and equipment

    International Nuclear Information System (INIS)

    Biest, O. v.d.

    1984-01-01

    The research activities of the Division at the Petten Establishment have the aims of characterising the properties of high temperature materials in industrial process environments and of understanding the structures involved in order to gain an insight into behavioural mechanisms. Metallic materials fall within the scope of the programme; the activities are, at present, almost entirely concerned with austenitic steels and nickel based alloys. Starting in 1984, advanced ceramic materials will be studied as well. The equipment available permits the study of mechanical properties in controlled gaseous environments, of the rates and mechanisms of corrosive reactions between materials and those environments, and of the surface and bulk structures by advanced physical techniques. Special preparation and treatment techniques are available. The Division has developed a Data Bank on high temperature alloys. It also operates an information Centre, the activities of which include the organisation of scientific meetings, the commissioning of ''state of the art'' studies on topics in the field of high temperature materials and their applications and the development of a inventory of current research activities in the field in Europe. This booklet is intended to present the facilities and services of the Division to the organizations which are interested in its programmes of work

  3. ISS qualified thermal carrier equipment

    Science.gov (United States)

    Deuser, Mark S.; Vellinger, John C.; Jennings, Wm. M.

    2000-01-01

    Biotechnology is undergoing a period of rapid and sustained growth, a trend which is expected to continue as the general population ages and as new medical treatments and products are conceived. As pharmaceutical and biomedical companies continue to search for improved methods of production and, for answers to basic research questions, they will seek out new avenues of research. Space processing on the International Space Station (ISS) offers such an opportunity! Space is rapidly becoming an industrial laboratory for biotechnology research and processing. Space bioprocessing offers exciting possibilities for developing new pharmaceuticals and medical treatments, which can be used to benefit mankind on Earth. It also represents a new economic frontier for the private sector. For over eight years, the thermal carrier development team at SHOT has been working with government and commercial sector scientists who are conducting microgravity experiments that require thermal control. SHOT realized several years ago that the hardware currently being used for microgravity thermal control was becoming obsolete. It is likely that the government, academic, and industrial bioscience community members could utilize SHOT's hardware as a replacement to their current microgravity thermal carrier equipment. Moreover, SHOT is aware of several international scientists interested in utilizing our space qualified thermal carrier. SHOT's economic financing concept could be extremely beneficial to the international participant, while providing a source of geographic return for their particular region. Beginning in 2000, flight qualified thermal carriers are expected to be available to both the private and government sectors. .

  4. Diagnostics of Electric Equipment Windings

    Directory of Open Access Journals (Sweden)

    I. I. Branovitsky

    2007-01-01

    Full Text Available The paper presents methodology and results of the investigations pertaining to study of influence of short-circuited turns on transient electrical processes in electric motor windings. Dependence of their damped speed and value of the difference signal, obtained at reciprocal subtraction of damped oscillation curves in absence and in presence of short-circuited turns, on number of turns in the tested windings. It has been determined that damped oscillation curves, immediately attributed to short-circuited turns, have peak values along temporary axis which are areas of the largest transient process sensitivity to КЗ turns.Methodology for diagnostics of single- and three-phase electric motor windings and also other electric equipment, being realized in DO-1 device, has been developed in the paper. The men­tioned device makes it possible to carry out visual comparison and quantitative analysis of damped oscillation curves in the tested windings with standard ones which are set in the device memory and their difference signals.

  5. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  6. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  7. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  8. Method of bituminization equipment decontamination

    International Nuclear Information System (INIS)

    Alexa, J.

    1982-01-01

    Overheated water vapour is fed into the contaminated area containing substances insoluble in water but soluble in organic solvents. Prior to entry into the decontaminated area the vapour bubbles through the aqueous solution layer of suitable detergents and a layer of suitable organic solvent. In this process the distillation takes place of the solvent and the aerosols of the aqueous solution are carried away with the vapour stream, condense on the inner surface of the vessel and thus wash it. The condensate flows down the walls and in its place condense other fractions of pure solvent and the aqueous solution. The walls of the vessel are slowly heated and the liquid waste is discharged via a mud discharge pipe. (J.B.)

  9. Energy-Effective Rotation Equipment

    Directory of Open Access Journals (Sweden)

    V. G. Kascheev

    2013-01-01

    Full Text Available The article presents invention, which allows to create compact and cheap fog-forming devices for industrial hothouses (plants, greenhouses, storehouses, testing polygons and other Objects. Besides, this invention gives the possibilities to modernize the traversers of gas-water fire-fighting type AGVS-100 or AGVS-150, using turbojet engines. Utilization of fog-forming machines among fire-fighting devices will increase the effectiveness in fire-fighting of forest and industrial Objects and oil fields.

  10. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  11. History and development of the tennis equipment

    OpenAIRE

    Horáková, Kateřina

    2007-01-01

    Title: History and development of the tennis equipment. Aim of the work: Process an integral, tabular and synoptic historical development overview of the tennis equipment. This owerview will cover the period since the early beginnings of the game to present days. Methods: Advance work has historical charakter therefore used methods are historiogaphical methods such as chronological method and historical method. Results: Produce tabular description of the tennis equipment by means of reading a...

  12. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  13. Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL)

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL) provides a variety of research, design engineering and prototype fabrication services...

  14. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  15. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  16. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  17. 21 CFR 866.4500 - Immunoelectrophoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... clinical use with its electrical power supply is a device used for separating protein molecules...

  18. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  19. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  20. Lunar construction/mining equipment

    Science.gov (United States)

    Ozdemir, Levent

    1990-01-01

    For centuries, mining has utilized drill and blast as the primary method of rock excavation. Although this technique has undergone significant improvements, it still remains a cyclic, labor intensive operation with inherent safety hazards. Other drawbacks include damage to the surrounding ground, creation of blast vibrations, rough excavation walls resulting in increased ventilation requirements, and the lack of selective mining ability. Perhaps the most important shortcoming of drill and blast is that it is not conducive to full implementation of automation or robotics technologies. Numerous attempts have been made in the past to automate drill and blast operations to remove personnel from the hazardous work environment. Although most of the concepts devised look promising on paper, none of them was found workable on a sustained production basis. In particular, the problem of serious damage to equipment during the blasting cycle could not be resolved regardless of the amount of charge used in excavation. Since drill and blast is not capable of meeting the requirements of a fully automated rock fragmentation method, its role is bound to gradually decrease. Mechanical excavation, in contrast, is highly suitable to automation because it is a continuous process and does not involve any explosives. Many of the basic principles and trends controlling the design of an earth-based mechanical excavator will hold in an extraterrestrial environment such as on the lunar surface. However, the economic and physical limitations for transporting materials to space will require major rethinking of these machines. In concept, then, a lunar mechanical excavator will look and perform significantly different from one designed for use here on earth. This viewgraph presentation gives an overview of such mechanical excavator systems.

  1. Mono pump equipment evaluation report

    International Nuclear Information System (INIS)

    1992-01-01

    A mobile pump has been designed, developed, and tested as part of an effort to increase oil spill response time, improve oil/water recovery efficiency and reduce cleanup and reclamation costs. The pump is mounted on an engine powered track carrier, and can be detached from the carrier and skidded into remote spill sites or transported by helicopter. The pump can safely recover highly volatile flammable substances such as condensate and gasoline, as well as heavy crude oil up to 5000 centipoise viscosity. It can pump up to 30 gal/min at zero head, and up to 1000 feet in a vertical direction. 13 figs

  2. Constructing a User Interface for Cellular Phones Using Equipment and its Relations

    Directory of Open Access Journals (Sweden)

    Misayo Kitamura

    2003-04-01

    Full Text Available In a domain of SCADA (Supervisory Control And Data Acquisition systems, it is necessary to obtain information about plants such as water plants in remote places using a cellular phone in order to ascertain plant status in case of emergency.T o utilize the small screen of a cellular phone and to eliminate the engineering cost of creating de.nition data to show plant status, a method of constructing user interface using equipment in the plant and its relations is proposed. In this method, some equipment is selected from all supervised equipment using the relations between the equipment, and then the content to be displayed is generated dynamically using the selected equipment. The equipment in plants is organized as a graph structure, which involves the equipment and the relations between the equipment.T he relations adopted in this method are both the physical connections between the equipment and the conceptual relationships.The result of the selection depends on the relations and their parameter values called the context dependent weight, which changes dynamically by viewpoints.

  3. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  4. Using ADA Tasks to Simulate Operating Equipment

    Science.gov (United States)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  5. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  6. Emergency team personnel and technical equipment

    International Nuclear Information System (INIS)

    Muralt, R.

    1989-01-01

    The most important requirements for the emergency team can be summarized in three points. 1) The emergency team must be made up of top personnel from all fields and it should be functionally equiped. 2) The emergency teams must have complete command of their equipment. 3) The members of the team must be well motivated. 1 fig

  7. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  8. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  9. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  10. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  11. Plutonium Immobilization Can Loading Equipment Review

    International Nuclear Information System (INIS)

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations

  12. Radio monitoring problems, methods, and equipment

    CERN Document Server

    Rembovsky, Anatoly; Kozmin, Vladimir; Smolskiy, Sergey

    2009-01-01

    Offers a unified approach to fundamental aspects of Automated Radio Monitoring (ARM). This book discusses the development, modeling, design, and manufacture of ARM systems. It provides classification and descriptions of modern high-efficient hardware-software ARM equipment, including the equipment for detection and radio direction-finding.

  13. Development of Equipment for Use in Sport

    Science.gov (United States)

    James, David

    2012-01-01

    No one has ever been able to create a running shoe that can make one run faster, but in other sports the design of equipment has the potential to offer considerable enhancement. Judgement has to be made as to whether such advantage becomes unfair. This article indicates many possible sports in which the equipment plays an important part in the…

  14. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  15. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  16. 47 CFR 18.203 - Equipment authorization.

    Science.gov (United States)

    2010-10-01

    ... information already on file with the Commission. (2) A technical report pursuant to §§ 18.207 and 18.311. (b... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT...

  17. Water hammer research in networks

    Directory of Open Access Journals (Sweden)

    Anželika Jurkienė

    2015-10-01

    Full Text Available Formation of water hammer, its consequences and possible protection measures are rarely topics, however the problem is significant. Water hammer can form in water supply and pressurized sewage networks, for various reasons. The article presents short theory of water hammer and methodology for calculation of specific parameters. Research of water hammer was performed in real water supply and sewer networks of country. Simulation of water hammer was carried out by turning on and off water pumps in pumping station. Successful measurement of water hammer depends on accuracy of the measurement equipment, therefore during the research surge wave fluctuations were measured with especially high resolution pressure meters. Detailed analysis of water hammer and selection of protecting equipment hydraulic model of water supply network was created. Protection against water hammer helps to avoid breaking of the water network and extend operation time.

  18. Rovdrill{sup R} and the Rovdrill{sup R} 'M' series, pushing the limits of the offshore geotechnical investigation

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, Allan [Perry Slingsby Systems Inc., North Yorkshire (United Kingdom)

    2008-07-01

    This paper will describe the development and actual field performance of a new remotely operated sub sea drilling, coring and in-situ soil sampling rig - Rovdrill{sup R}, the paper will further describe the subsequent development of the latest generation Rovdrill{sup R} the Rovdrill{sup R} 'M' Series which represents the very latest in leading edge remotely operated seabed mode rigs. We are seeing the potential for continued and sustained growth in the sub sea mineral exploration market, which will call for new and innovative complimentary equipment and processes to be developed, currently the pioneering nature of this work often carries with it limited budgets and hence the necessity for economic, yet effective solutions to new and complex sub sea intervention problems. This, in addition to the ever increasing activity levels in the offshore geotechnical investigation arenas, particularly the increasing number of sub sea oil and gas construction and shallow water renewable energy system installation projects, is driving us - as leading providers of sub sea intervention systems to develop complimentary and competitive solutions. The Rovdrill{sup R} product is one such system, which having already enjoyed some initial recognition and acceptance as a competent geotechnical data acquisition tool has now been further developed to service a much wider and expanding market. (author)

  19. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  20. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  1. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  2. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  3. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  4. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  5. 33 CFR 164.43 - Automatic Identification System Shipborne Equipment-Prince William Sound.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Automatic Identification System Shipborne Equipment-Prince William Sound. 164.43 Section 164.43 Navigation and Navigable Waters COAST GUARD... Automatic Identification System Shipborne Equipment—Prince William Sound. (a) Until December 31, 2004, each...

  6. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  7. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  8. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  9. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  10. Use of ice storage equipment in the food industry

    Energy Technology Data Exchange (ETDEWEB)

    Vries, H. de

    1984-01-01

    The manufacture of foods in its widest sense demands a 'balanced supply of cooling'. Whenever 'cold requirement' occurs in different ways during production, the ice storage equipment in particular for 'cooling supplies'. The cooling performance (amount of cold from horizontal tubes and slabs or from horizontal pipes given off to the water flowing past) that can be expected from modern ice storage equipment, is made clear numerically. The way the storage vessel is constructed and its design have particular influence on the energy-saving quality (stirring mechanism with high performance at low pump capacity). Optimisation results for a plate evaporator design combined with a heat exchange system are presented. These include running cost savings of up to 18% in a yoghurt factory, a maltery and an ice cream factory. By means of this heat pump compound, environmental energy can be used in cold storage.

  11. Tl dosimetry around equipment s for dental radiography

    International Nuclear Information System (INIS)

    Medrano, E.; Robles G, M. A.; Vega C, H. R.; Letechipia de L, C.; Hernandez D, V. M.

    2014-08-01

    The ambient dose equivalent around X-rays units used in dentistry has been measured. The radiation that escapes of the tail stock of the X-rays equipment was also measured, and the dose in the surfaces of a polyethylene spherical mannequin and other of water, used to represent the patient and the operator, respectively. The study was realized with thermoluminescent dosimeters of the type 100. The operation conditions of the X-rays units were varied when the ambient dose equivalent was measured. In the other measurements the equipment s were operated to 70 k Vp and 8 m A. In the ambient dose equivalent was found asymmetry, likewise the due dose to the radiation that escapes of one of tail stocks was also asymmetric. The dose values in the mannequins went minors to the recommended reference values. (Author)

  12. Safety systems I/C equipment reliability analyses of the Kozloduy NPP units 3 and 4

    Energy Technology Data Exchange (ETDEWEB)

    Halev, G; Christov, N [Risk Engineering Ltd., Sofia (Bulgaria)

    1996-12-31

    The purpose of the analysis is to assess the safety systems I/C equipment reliability. The assessment includes: quantification of the safety systems unavailability due to component failures; definition of the minimal cut sets leading to the analysed safety systems failure; quantification of the I/C equipment importance measures of the dominant contribution components. The safety systems I/C equipment reliability has been analysed using PSAPACK (a code for probabilistic safety assessment). Fault trees for the following safety systems of the Kozloduy-3 and Kozloduy-4 reactors have been constructed: neutron flow control equipment, reactor protection system, main coolant pumps, pressurizer safety valves `Sempell`, steam dump systems, spray system, low pressure injection system, emergency feeding water system, essential service water system. THree separate reports have been issued containing the performed analyses and results. 1 ref.

  13. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  14. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  15. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  16. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  17. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  18. Equipment for x- and gamma ray radiography

    International Nuclear Information System (INIS)

    Abd Nasir Ibrahim; Azali Muhammad; Ab Razak Hamzah; Abd Aziz Mohamed; Mohammad Pauzi Ismail

    2004-01-01

    The following topics related to the equipment for x - and gamma ray radiography are discussed in this chapter. The topics are x-ray source for Industrial Radiography: properties of x-ray, generation of x-ray, mechanism of x-ray production, x-ray equipment, power supply, distribution of x-ray intensity along the tube: gamma ray source for Industrial Radiography: properties of gamma rays, gamma ray sources, gamma ray projectors on cameras, source changing. Care of Radiographic Equipments: Merits and Demerits of x and Gamma Rays

  19. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  20. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  1. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  2. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  3. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  4. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  5. Site investigation equipment developed by Teollisuuden Voima Oy

    International Nuclear Information System (INIS)

    Oehberg, A.

    1991-02-01

    Teollisuuden Voima Oy (TVO) carries out site investigations in Finland for final disposal of nuclear high level waste during 1987-2000. In order to carry out the investigations some essential equipment have been designed and constructed. The biggest insufficiency among different measuring methods was among water sampling and hydraulic testing. There are some common specifications which all of these equipment has to fulfil. The two most important are that they have to be operatable in deep slim boreholes down to 1000 meters depth with 56 mm in diameter. The main purpose of the Hydraulic Testing Unit is to determine hydraulic conductivity in crystalline rock, where water can flow primarily through fractures. In most commonly used configurations, measurement range is from 10 - 11 to 10 - 5 m/s with constant-head method. Although constant-head method is principally used, almost any known hydraulic method is possible with existing hardware. Most functions are controlled by the computer. The whole system is built into an electrically heated trailer. The system consists of inflatable packers, stainless steel rods, pressure transducers and datalogging devices. The maximum number of monitoring sections is seven. In addition to that as many blind sections as is needed to prevent vertical flow in boreholes can be installed. Water sampling is possible either with a double packer method or in conjunction with the hydraulic head monitoring equipment. The first possibility involves using the laboratory trailer and the second one using a separate pumping unit plus the laboratory trailer in a later phase when sampling is to be conducted. In the laboratory trailer there are all the measuring devices needed to control different chemical parameters (pH, Eh, pS, O 2 , conductivity and temperature) during pumping

  6. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  7. 18 CFR 367.57 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or... walls, ceilings or floors or without in some way impairing the building, must be included in the...

  8. Capitalization of Defense Technology Security Administration Equipment

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1996-01-01

    ... $5.2 million in the Equipment in Use account on its trial balance. Starting with FY 1996, Defense Technology Security Administration financial data will be included in consolidated DoD financial statements...

  9. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  10. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  11. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  12. Study Of Robotic Replacement Of Equipment Modules

    Science.gov (United States)

    Backes, Paul G.; Tso, Kam S.

    1992-01-01

    Report discusses issues pertaining to control of single-arm robotic manipulator to remove and install interchangeable equipment modules. Presents preliminary control strategy intended to guide development of control algorithms, along with analyses of problems arising in implementing strategy.

  13. Market survey of level measurement equipment

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    In a market survey of level measurement equipment from 42 manufacturers, which is based on different principles of measurement and which is used for different applications, the data of the various manufacturers is compiled. (orig./HP) [de

  14. 77 FR 13173 - Best Equipped Best Served

    Science.gov (United States)

    2012-03-05

    ... on the best equipped, best performing, best served concept for implementation in the 2012-2014... Advisory Committee (NAC). FAA is seeking stakeholder input on the technical and operational feasibility of...

  15. Methods and equipments used in power reactors

    International Nuclear Information System (INIS)

    Beraha, R.; Delevallee, A.

    1976-01-01

    The various reactor γ fuel scanning facilities presently operating around the world are reviewed. Both equipments proposed by FRAMATOME are described: one is intended for scanning removable fuel pencils, and the other one for fuel assembly scanning [fr

  16. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  17. VIRTUAL ELECTRONIC COMPONENTS OF THE ELECTRONIC EQUIPMENT

    Directory of Open Access Journals (Sweden)

    E. Lazarevich

    2013-01-01

    Full Text Available The article is present new idea of the creation, developments and improvements of the electronic equipment of complex systems by means of the virtual electronic components. The idea of the virtual electronic components is a presentation and perception of the creation and developments of the equipment on two forming: real – in the manner of standard marketed block of the intellectual property and image – in the manner of virtual component. The real component in most cases slows the development of the electronic equipment. The imaginary component is the «locomotive» of development of the electronic equipment. The Imaginary component contains the scientific has brushed against developer. The scientific has brushed against developer reveals of itself in the manner of virtual component on the modern level of the design rates of microelectronics.

  18. 7 CFR 58.626 - Packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... containers with frozen desserts shall be constructed so that all product contact surfaces shall be of... Standards for Equipment for Packaging Frozen Desserts and Cottage Cheese. Quality Specifications for Raw...

  19. ENERGY STAR Certified Small Network Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Small Networking Equipment that are effective as...

  20. Ethical home medical equipment business practices.

    Science.gov (United States)

    Parver, C

    1991-11-01

    National uniform standards as a condition for receipt of a Medicare provider number would help rid the home medical equipment industry of those unethical and unscrupulous suppliers who have tarnished the industry's reputation.

  1. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  2. Equipment for oral surgery in small animals.

    Science.gov (United States)

    Reiter, Alexander M

    2013-05-01

    This article provides an overview of equipment used for oral surgery. Specific instruments and materials used when performing relevant operative procedures are also mentioned in other articles in this issue. Copyright © 2013 Elsevier Inc. All rights reserved.

  3. Equipment and building structures ageing management for WWER type NPPs

    International Nuclear Information System (INIS)

    Mayboroda, O.

    2001-01-01

    This report presents the working group 'Equipment and building structures ageing management for WWER type NPPs' activities. The analysis of experience in ageing management, recommendations for regulatory guidelines on ageing management, investigation of case studies, definition suitable communication channels among regulators for ageing related data are given. Analyses of water chemistry, inspection data (safety margins criteria), plugging criteria, volume and time of ECT implementation in all WWER countries are presented. The results of Working group activity show that it is advisable to concentrate efforts on: set up the permanent communication channel among regulators, collection of regulatory criteria for WWER type NPP key components based on understanding of ageing mechanisms and data collection

  4. Design Modification of Kori Unit 1 for the Equipment Qualification

    International Nuclear Information System (INIS)

    Park, J. W.; Kim, M. Y.; Han, K. T.; Park, J. D.

    2007-01-01

    There has not been a strict regulatory requirements for the Equipment Qualification(EQ) in 1970's when Kori Unit 1 had begun the construction and the commercial operation. The Korean regulatory body requested the EQ on the various safety-related components, as a result of Periodic Safety Review. However, the EQ itself is impossible in some areas, due to the high pressure/temperature and flooding environment conditions from the pipe breaks. Design modification is being considered in the Auxiliary Building, the Intermediate Building, the Component Cooling Water Heat Exchanger Building and the Turbine Building, in order to mitigate the environmental conditions for the EQ

  5. Blindagem eletromagnética, aterramento e proteção contra surtos de tensão em equipamentos para monitoramento automático do teor de água no solo Electromagnetic shielding, grounding and protection against voltage surges in equipments for automatic soil-water measurements

    Directory of Open Access Journals (Sweden)

    Claudia F. A. Teixeira

    2004-04-01

    Full Text Available O objetivo do presente trabalho foi implementar um sistema de blindagem eletromagnética, aterramento e proteção contra surtos de tensão na instalação de instrumental para o monitoramento automático do teor de água no solo. O experimento foi instalado em Piracicaba, São Paulo, em que os equipamentos utilizados foram um testador de cabos marca Tektronix, que opera pelo princípio da reflectometria no domínio do tempo e um sistema de aquisição de dados marca Campbell Scientific Inc. (CSI, que controla e analisa as formas de onda produzidas pelo testador de cabos. A umidade volumétrica foi obtida indiretamente por meio de sensores inseridos no solo, os quais medem a constante dielétrica do mesmo. Utilizaram-se tubos galvanizados para a blindagem eletromagnética dos cabos e hastes "cooperweld", cordoalha de cobre e terminais bimetálicos para o sistema de aterramento. Para o sistema de proteção eletroeletrônica, utilizaram-se um disjuntor para a separação do circuito de alimentação, protetor de surtos, "no-breaks" e medidor de resistência de terra. Face aos resultados obtidos, pode-se concluir que o sistema proposto, ao utilizar material geralmente preexistente em locais de pesquisa agropecuária, apresentou uma proteção eficaz.The objective of this paper was to implement an electromagnetic shielding, grounding and voltage surge protection in equipments for automatic soil water monitoring. The experiment was carried out in Piracicaba, São Paulo State, Brazil, using a Tektronix Cable Tester (Model 1502 B that operates by time domain reflectometry (TDR and a datalogger (CR10X, Campbell Scientific Inc., CSI to control and analyze the waveforms produced by the cable tester. The water content was indirectly obtained by measuring the dielectric constant through probes inserted in the soil. For electromagnetic shielding the energy and signal cables were inserted in galvanized pipes, linked together by means of copper wire fixed in

  6. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  7. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  8. Ion beam stabilization in ion implantation equipment

    International Nuclear Information System (INIS)

    Pina, L.

    1973-01-01

    The results are presented of experimental efforts aimed at ion beam current stabilization in an equipment for ion implantation in solids. The related problems of power supplies are discussed. Measured characteristics of laboratory equipment served the determination of the parameters to be required of the supplies as well as the design and the construction of the supplies. The respective wiring diagram is presented. (J.K.)

  9. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  10. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  11. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  12. Stud bolt handling equipment for reactor vessel

    International Nuclear Information System (INIS)

    Bunyan, T.W.

    1989-01-01

    Reactor vessel stud bolt handling equipment includes means for transferring a stud bolt to a carrier from a parking station, or vice versa. Preferably a number of stud bolts are handled simultaneously. The transfer means may include cross arms rotatable about extendable columns, and the equipment is mounted on a mobile base for movement into and out of position. Each carrier comprises a tubular socket and an expandable sleeve to grip a stud bolt. (author)

  13. Protecting electrical equipment against dust explosions

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J

    1981-07-01

    The new ordinance on electrical equipment in hazardous areas and the new VDE 0165/6.80 have brought about significant changes in the field of electrical equipment in areas with a explosion hazard due inflammable dust. There are no constructional regulations yet in this field, and producers, planners, and users are uncertain about what measures to take. The article attempts to clear up a few points.

  14. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  15. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  16. Electronic equipment for spectrometric data processing

    International Nuclear Information System (INIS)

    Antonov, L.J.; Trenev, A.M.; Todorova, E.I.; Dimitrov, V.D.

    1978-01-01

    Electronic equipment carrying out logical operations and a full set of the arithmetic operations was developed for spectrometric data processing. The flowsheet of the computing part of the device, made on the basis of a specialized integral circuit, is given. The device includes input registers, multiplexor, matrix commutator, arithmetic unit and indication unit. The equipment is rated to carry out calculations according to comparatively complex formulae in several seconds

  17. Physical protection equipment study. Final report

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    This report summarizes the work performed by MITRE for the U.S. Nuclear Regulatory Commission. The major products of this effort are a Catalog of Physical Protection Equipment, a Guide for Evaluation of Physical Protection Equipment, a book of Reference Materials, and a set of guidelines for use in the development of a methodology for measuring levels of security system effectiveness. A summary of recommendations resulting from this study is also presented

  18. Industrial Employment, Investment Equipment and Economic Growth

    OpenAIRE

    Dellas, Harris

    2000-01-01

    The industrialization of labour is the main engine of growth during the early stages of economic development. In less developed countries, equipment investment has played a less important role than non-equipment investment; and it has only proved growth enhancing when it either encountered a substantial industrial labour force or fostered a large increase in the share of industrial employment. These findings draw attention to the effects of investment on the composition of the labour force; a...

  19. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  20. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  1. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  2. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  3. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  4. Improving the Thermal Testing Technology of Technological Equipment of Autonomous Complexes

    Directory of Open Access Journals (Sweden)

    V. V. Chugunkov

    2017-01-01

    Full Text Available The environmental conditions of autonomous objects of different-purpose technical complexes are in close relationship with increased values of operating temperatures. This requires thermal pretesting of the process equipment. The publication [1] considers the thermal test conditions in which the equipment elements under test are placed in a heated water tank covered by the globe insulators where, under automatic temperature control using a block of heaters, they are then kept for a specified period of time at a specified temperature range. Such an approach to the thermal tests of equipment allows us to reduce, but not eliminate completely the mass flows of water from evaporation with reducing power consumption of test equipment.Despite the results achieved, even a little bit of water vapor available when conducting the thermal tests may cause a failure of equipment. Therefore, there is a need in test equipment modernization for complete eliminating the fluxes of mass water and better power consumption in the test process. To this end, it is proposed to place a three-layer bubble wrap on the open surface of water.To justify an efficiency of the proposed option was developed a mathematical model of heat and mass transfer processes that occur during thermal tests, taking into account the geometric and thermo-physical characteristics of test tank, polymer film, and equipment. Using the laws and equations of heat and mass transfer enabled us to determine the required capacities for heating the tank with water and equipment to the required temperature range for a specified time, as well as the mass flows of water when evaporating from the tank surface.The efficiency of the three-layer bubble film as compared with the globe insulators as the elements for covering the test tank the surface has been analysed on the basis of the results obtained.The proposed film coating allowed almost complete elimination of evaporation losses of water mass and almost 8

  5. Crud separation from equipment drain of BWR atomic power station

    International Nuclear Information System (INIS)

    Hayashi, Masaru; Yamaguchi, Hisashi; Moriya, Yasuhiro; Koshiba, Yukihiko; Ota, Yoshiharu.

    1977-01-01

    In the primary cooling systems of BWR nuclear power stations, radioactive crud is generated and accumulates in reactors and circulating systems, which causes the radiation exposure of workers at the time of the inspection and maintenance of reactors. The chemical composition and grain size distribution of crud differ largely according to the construction of primary systems, the operational conditions of reactors, and the process of operation. The study on the application of nuclear pore membrane filter NPMF to the separation of crud in the waste water from equipment drain systems has been carried out. With the NPMF, clarified filtrate can be obtained without any filter aid, therefore the secondary waste of filter sludge is not generated. When the filter is clogged, the filtration capability can be regenerated by reverse flow washing, and continuous filtration is possible actually because the regeneration takes only short time. The NPMF is the polycarbonate membrane of about 10 μm thick, to which charged particles are irradiated vertically, and the flight tracks are etched with alkali solution, thus the required pore treatment is applied. The basic investigation of waste liquid, the endurance test of actual filters, the filtration test with the pilot apparatus, the demonstration test with an actual equipment, and the design of the actual equipment have been carried out for three years. (Kako, I.)

  6. Queuing theory models used for port equipment sizing

    Science.gov (United States)

    Dragu, V.; Dinu, O.; Ruscă, A.; Burciu, Ş.; Roman, E. A.

    2017-08-01

    The significant growth of volumes and distances on road transportation led to the necessity of finding solutions to increase water transportation market share together with the handling and transfer technologies within its terminals. It is widely known that the biggest times are consumed within the transport terminals (loading/unloading/transfer) and so the necessity of constantly developing handling techniques and technologies in concordance with the goods flows size so that the total waiting time of ships within ports is reduced. Port development should be achieved by harmonizing the contradictory interests of port administration and users. Port administrators aim profit increase opposite to users that want savings by increasing consumers’ surplus. The difficulty consists in the fact that the transport demand - supply equilibrium must be realised at costs and goods quantities transiting the port in order to satisfy the interests of both parties involved. This paper presents a port equipment sizing model by using queueing theory so that the sum of costs for ships waiting operations and equipment usage would be minimum. Ship operation within the port is assimilated to a mass service waiting system in which parameters are later used to determine the main costs for ships and port equipment.

  7. Deuterium-depleted water

    International Nuclear Information System (INIS)

    Stefanescu, Ion; Steflea, Dumitru; Saros-Rogobete, Irina; Titescu, Gheorghe; Tamaian, Radu

    2001-01-01

    Deuterium-depleted water represents water that has an isotopic content smaller than 145 ppm D/(D+H) which is the natural isotopic content of water. Deuterium depleted water is produced by vacuum distillation in columns equipped with structured packing made from phosphor bronze or stainless steel. Deuterium-depleted water, the production technique and structured packing are patents of National Institute of Research - Development for Cryogenics and Isotopic Technologies at Rm. Valcea. Researches made in the last few years showed the deuterium-depleted water is a biological active product that could have many applications in medicine and agriculture. (authors)

  8. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  9. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  10. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  11. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  12. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  13. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  14. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  15. The oil and gas equipment and services market in India

    International Nuclear Information System (INIS)

    2002-01-01

    In terms of purchasing power, India represents the fourth largest economy in the world. In the year April 1, 2001-Mar 31, 2002, it was estimated that India had a 5.4 per cent growth in gross domestic product (GDP). Canada experienced a 19.9 per cent increase in exports to India in 2001, reaching 656 million dollars. With the world's six-largest energy consumption, oil demand in India is expected to grow to 179 million tonnes in 2006-2007, while the demand for natural gas is expected to reach 231 million cubic metres per day in the same period. To meet this growing demand, India will require investments in the order of 150 billion dollars over the next 10 to 12 years. The oil and gas industry is being opened to the private sector and foreign direct investment, due to new government policies on exploration, production, distribution, and sales. Foreign involvement in exploration, previously restricted to Indian state-owned firms, is now allowed through the New Exploration Licensing Policy. In exploration and production (E and P) activities, as well as the refinery sector, foreign ownership of up to 100 per cent is now allowed. Two Indian companies which dominate the Indian E and P sector, namely Oil and Natural Gas Corporation (ONGC) and Oil India Limited (OIL), will be upgrading their ageing infrastructure, purchasing new equipment and redeveloping existing oil and gas fields, thereby creating opportunities for the supply of equipment and services. Canadian companies possessing the latest technologies and services in exploration, drilling machinery and equipment, directional drilling services, production machinery and equipment, enhanced recovery services, deep-water drilling equipment and services, and equipment for coal methane E and P should benefit from these opportunities. Over 12,000 kilometres of pipelines are being planned across India, as well as private opportunities in the refinery sector which was opened to the private sector in April 2002. Occasional

  16. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  17. 30 CFR 75.1107-7 - Water spray devices; capacity; water supply; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Water spray devices; capacity; water supply... Water spray devices; capacity; water supply; minimum requirements. (a) Where water spray devices are... square foot over the top surface area of the equipment and the supply of water shall be adequate to...

  18. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  19. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  20. Epidemiology of Pseudomonas aeruginosa in cystic fibrosis and the possible role of contamination by dental equipment

    DEFF Research Database (Denmark)

    Jensen, E T; Giwercman, B; Ojeniyi, B

    1997-01-01

    Cystic fibrosis (CF) patients often suffer from Pseudomonas aeruginosa lung infection yet the source of this organism is not known. In order to determine whether CF patients might be contaminated with P. aeruginosa from dental equipment, a total of 103 water samples from 25 dental sessions...... samples (5.5%) from nine sessions (11%) were positive for P. aeruginosa. In one case, genotypically identical (RFLP, pulsed-field gel electrophoresis) P. aeruginosa strains were found both in water from the dental equipment and in the CF patients sputum. This indicates a small risk for acquiring P...

  1. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  2. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  3. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  4. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  5. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  6. Design by analysis of composite pressure equipment

    International Nuclear Information System (INIS)

    Durand, S.; Mallard, H.

    2004-01-01

    Design by analysis has been particularly pointed out by the european pressure equipment directive. Advanced mechanical analysis like finite element method are used instead of classical design by formulas or graphs. Structural behaviour can be understood by the designer. Design by analysis of metallic pressure equipments is widely used. Material behaviour or limits analysis is based on sophisticated approach (elasto-plastic analysis,..). Design by analysis of composite pressure equipments is not systematically used for industrial products. The difficulty comes from the number of information to handle. The laws of mechanics are the same for composite materials than for steel. The authors want to show that in design by analysis, the composite material approach is only more complete than the metallic approach. Mechanics is more general but not more complicated. A multi-material approach is a natural evolution of design by analysis of composite equipments. The presentation is illustrated by several industrial cases - composite vessel: analogy with metallic calculations; - composite pipes and fittings; - welding and bounding of thermoplastic equipments. (authors)

  7. A Computerized Procedure linked to Virtual Equipment

    International Nuclear Information System (INIS)

    Jung, Yeon Sub; Song, Tae Young

    2011-01-01

    Digital, information, and communication technologies have change human's behavior. This is because human has limitation to memorize and process information. Human has to access other information and real time information for important decisions. Those technologies are playing important roles. Nuclear power plants cannot be exception. Many accidents in nuclear power plants result from absent or incorrect information. The information for nuclear personnel is context sensitive. They don't have enough time to verify the context sensitive information. Therefore they skip the information, as resulting in incident. Nuclear personnel are usually carrying static paper procedures during local task performance. The procedure guides them steps to follow. There is, however, no dynamic and context sensitive information in the paper. The effect of the work is evaluated once while getting permission of the work. Afterward they are not informed. The static paper is generally simplified, so that it does not show detail of equipment being manipulated. Particularly novice workers feel difficult to understand the procedure due to lack of detail. Pictures of equipment inserted in the procedure are not enough for comprehension. A computerized procedure linked with virtual equipment is one of the best solutions to increase the detail of procedure. Virtual equipment, however, has still limitation not to provide real time information, because the virtual equipment is not synchronized with real plants

  8. Leak Detectives Saving Money, Water in Virginia

    Science.gov (United States)

    “Circuit riders” from the Virginia Rural Water Association (VRWA) are traveling to small communities across the Commonwealth using special equipment financed by EPA to locate expensive and wasteful leaks in drinking water distribution systems.

  9. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  10. 46 CFR 160.026-4 - Water.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Water. 160.026-4 Section 160.026-4 Shipping COAST GUARD... APPROVAL LIFESAVING EQUIPMENT Water, Emergency Drinking (In Hermetically Sealed Containers), for Merchant Vessels § 160.026-4 Water. (a) Only water meeting the U.S. Public Health Service “Drinking Water Standards...

  11. New role for communication fibre optic cables in water utility for leak detection on main water pipeline

    OpenAIRE

    Graovac Radojica M.; Marković Dragomir V.

    2015-01-01

    During construction of main water pipeline it is usual practice to lay fibre optic communication cable along water pipe. This cable is one of the up to date communication media which is used for the connection purposes of water control SCADA equipment as well as for establishing of telephone communication between water utility plants. By developing of new electronic equipment known as DTS (Distributed Temperature Sensing) and DAS (Distributed Acoustic Sensing) equipment it has been opened the...

  12. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  13. EPERC: The European Pressure Equipment Research Council

    International Nuclear Information System (INIS)

    Darlaston, J.; McAllister, S.

    1998-01-01

    The European Pressure Equipment Research Council (EPERC) is a European Network of industries, research laboratories, inspection bodies and governmental institutions set up to foster co-operative research for the greater benefit of the European industry. The concept of a European Research Council originated at the PVRC meeting in Cannes in 1989 and since this time volunteers from the industry, research laboratories and of the European Commission Joint Research Centre, Petten have worked together to create a Statute for EPERC. In the context of the pressure equipment industry, the creation of EPERC is extremely pertinent, since in the near future, a Council directive on pressure equipment will replace the existing national regulations. In parallel to this, work is in progress for the elaboration of European Standards. It is useful to recall that ''Harmonised Standards'' will be the privileged means of complying with the Essential Safety Requirements of the directive. (author)

  14. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  15. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  16. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2003-12-01

    Development of radiation monitoring equipment could be the base of domestic development of RMS. And the technique could be adapted to development of other radiation equipment of KAERI as well as hospitals and nuclear power plants. The RMS technology could be adapted to the development of precision instruments related to nuclear radiation and be the base of fundamental technology such as protein structure analysis of bio technology, development of nano advanced material and aircraft material. The technology of multi-channel readout ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  17. Methods of equipment choice in shotcreting

    Science.gov (United States)

    Sharapov, R. R.; Yadykina, V. V.; Stepanov, M. A.; Kitukov, B. A.

    2018-03-01

    Shotcrete is widely used in architecture, hydraulic engineering structures, finishing works in tunnels, arc covers and ceilings. The problem of the equipment choice in shotcreting is very important. The main issues influencing the equipment choice are quality improvement and intensification of shotcreting. Main parameters and rational limits of technological characteristic of machines used in solving different problems in shotcreting are described. It is suggested to take into account peculiarities of shotcrete mixing processes and peculiarities of applying these mixtures with compressed air kinetic energy. The described method suggests choosing a mixer with the account of energy capacity, Reynolds number and rotational frequency of the mixing drum. The suggested choice procedure of the equipment nomenclature allows decreasing exploitation costs, increasing the quality of shotcrete and shotcreting in general.

  18. Equipment for light therapy BIOFIE family

    International Nuclear Information System (INIS)

    Corcho Corcho, C. A.; Perez Garcia, A.; Herrera Rodriguez, R.

    2016-01-01

    The development experienced in the design and implementation of equipment are presented, within the subject matter of the application of low level laser and also them LED of high efficiency with therapeutic purposes in health and also in animal health, besides, the use of this technology for this application in agriculture. All the equipment that show up has been developed for the Dpto. of Bioengineer of High Politechnical Institute Jose A. Echeverria (CUJAE) in association with Dpto. of Prototypes of the same institution, under the trademark BIOFIE. Like fundamental and innovative characteristic we can make a comment that all equipment destined to health and animal health, work on continuos and modulated signal mode, using in this mode different bio frequencies. (Author)

  19. Development of superconducting equipment for fusion device

    International Nuclear Information System (INIS)

    Konno, Masayuki; Ueda, Toshio; Hiue, Hisaaki; Ohgushi, Kouzou

    1993-01-01

    At Fuji Electric Co., Ltd., the development of superconductivity was started from 1960, and superconducting equipment for fusion device has been developed for ten years. The superconducting equipment, which is developed for fusion by Fuji Electric Co., Ltd., are able to be grouped in three categories which are current lead, superconducting coil and superconducting bus-line. The current lead is an electrical feeder between a superconducting coil and an electrical power supply. The rated current of developed current lead is 30kA at continuous use and 100kA at short time use respectively. The advanced disk type coil is developed for the toroidal field coil and some coils are developed for critical current measurement. Superconductor is applied to the superconducting bus-line between the superconducting coils and the current leads, and the bus-line is being developed for the Large Helical Device. This report describes an abstract of these equipment. (author)

  20. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  1. Consolidation equipment for irradiated nuclear fuel channels

    International Nuclear Information System (INIS)

    Taguchi, M.; Komatsu, Y.; Ose, T.

    1989-01-01

    The authors have developed and put into use a new type of mechanical consolidation equipment for irradiated nuclear fuel channels. This includes round-slice cutting of the top 100mm of the fuel channel with a guillotine cutter, and press cutting of the two corners of the remaining length of the fuel channel. Four guillotine blades work in combination with receiving blades arranged inside the fuel channel to cut the top 100mm, including the clips and spacers, of the fuel channel into a round slice. A press assembled in the consolidation equipment then presses the slice to achieve volume reduction. The press cutting operation uses two press cutting blades arranged inside the fuel channel and the receiving blades outside the fuel channel. The remaining length of fuel channel is cut off into L-shaped pieces by press cutting. This consolidation equipment is highly efficient because the round-slice cutting, pressing, and press cutting are all achieved by one unit

  2. Water management

    International Nuclear Information System (INIS)

    Barrada, Y.

    1981-01-01

    The Joint FAO/IAEA Division has been technically responsible for technical assistance projects aimed at improving water management practices in the following developing Member States: Argentina, Bulgaria, Chile, Costa Rica, Egypt, Greece, India, Ivory Coast, Kenya, Lebanon, Morocco, Niger, Nigeria, Pakistan, Peru, Republic of Korea, Romania, Senegal, Sri Lanka, Sudan, Syria, Tanzania, Turkey, Uganda and Zambia. The Division has also contributed to the improvement of the efficiency of water use through the implementation of three 5-year co-ordinated research programmes. Participants from eight to 15 countries have conducted research towards a common goal of improving nuclear techniques in water-use efficiency studies and developing practices to increase the food produced from a unit of irrigation water or rainfall. In many cases this was the first time such techniques have been used in the above countries. It was thus necessary to provide expert assistance to train local counterparts in the safe and efficient use of the equipment. Training courses have also been held in more advanced countries to familiarize young scientists from developing countries with the most modern techniques in soil/water research. Results obtained through the nuclear techniques aided research programmes will, when applied in farmers' fields on irrigated land, lead to increased yields, to reduced losses of nutrients through leaching below the rooting zone, and to conserving soil through avoiding the accumulation of salts close to the soil surface. Under rainfed agriculture, research results would help controlling erosion, conserving water, and ensuring sustained production at acceptable yield levels

  3. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  4. Water screen

    Energy Technology Data Exchange (ETDEWEB)

    Kutepov, A.I.; Fedotov, I.N.; Prokopov, O.I.

    1981-01-01

    The invention refers to ventilation and can be used for repair-fitting operations in a blasting-dangerous gas condition, for example, during elimination of gas-oil gushers, repair of gas-oil pipelines, equipment etc. In order to improve safety of labor, the nozzle adapters of the water collector are oriented towards each other. The collector is installed on a support with the possibility of rotating and vertical movement. The proposed screen excludes the possibility of blasting-dangerous concentrations of gases and guarantees extinguishing of the impact spark during operation of the tool.

  5. Process plant equipment operation, control, and reliability

    CERN Document Server

    Holloway, Michael D; Onyewuenyi, Oliver A

    2012-01-01

    "Process Plant Equipment Book is another great publication from Wiley as a reference book for final year students as well as those who will work or are working in chemical production plants and refinery…" -Associate Prof. Dr. Ramli Mat, Deputy Dean (Academic), Faculty of Chemical Engineering, Universiti Teknologi Malaysia "…give[s] readers access to both fundamental information on process plant equipment and to practical ideas, best practices and experiences of highly successful engineers from around the world… The book is illustrated throughout with numerous black & white p

  6. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  7. Risk matrix model for rotating equipment

    Directory of Open Access Journals (Sweden)

    Wassan Rano Khan

    2014-07-01

    Full Text Available Different industries have various residual risk levels for their rotating equipment. Accordingly the occurrence rate of the failures and associated failure consequences categories are different. Thus, a generalized risk matrix model is developed in this study which can fit various available risk matrix standards. This generalized risk matrix will be helpful to develop new risk matrix, to fit the required risk assessment scenario for rotating equipment. Power generation system was taken as case study. It was observed that eight subsystems were under risk. Only vibration monitor system was under high risk category, while remaining seven subsystems were under serious and medium risk categories.

  8. Development of diaphragm automatic homing equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidetoshi; Yamada, Koji; Moriya, Shinichi; Koike, Jiro; Okabe, Masao; Oyama, Akihiro.

    1996-01-01

    In steam-turbine overhaul inspection, one of the most important processes is to remove rust and deposited contaminants on the surface of turbine parts, while the turbine is in operation, to recover thermal efficiency and prepare good surface conditions for color penetrant inspection. These processes generally are done by dry honing, but this generates dust. To protect laborers against these conditions, Hitachi, Ltd. has developed automatic honing equipment for the diaphragms of the nuclear steam turbine. This equipment was first used in the first annual inspection and overhaul of Hamaoka Nuclear Power Plant No.4 of Chubu Electric Power Inc. (author)

  9. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  10. Maintenence and fabrication of Electronic Equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Young Keun; Kim, Jung Bok; Lee, Sang Suk

    2004-12-01

    Development of the SPND Monitor could be the base of development of small signal processing circuits and the technique could be used to develop other precision equipment. The repair technology for high purity germanium(HPGe) detector system could be adapted to other areas where high purity detectors are used such as hospitals, universities etc. The technology of multi-channel ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  11. Radiological equipment 'Planmeca' used in dentistry

    International Nuclear Information System (INIS)

    Tuciac, Carolina

    2011-01-01

    Equipment 'Planmeca Pro Max 3D' for volumetric imaging with cone beam examine the patients under computerized tomography considering the rate 0.2-1.0 mm, digital orthopantomography, 3D cephalometry. 3D tomography image facilitates an accurate view of oral structures. It was adopted quickly, and became the basic equipment for all applications in dentistry. The Cone Beam Volumetric Tomography (CBVT), Planmeca Pro Max 3D model give the opportunity to obtain great radiological information very important for the dentist decision. (author)

  12. Conceptual design report, CEBAF basic experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  13. RPC industries - UV and EB equipment manufacturers

    International Nuclear Information System (INIS)

    Rodrigues, A.M.

    1987-01-01

    RPC Industries has been manufacturing electron beam and ultraviolet equipment for the industrial processing of materials for more than 15 years. RPC maintains its headquarters and electron processor manufacturing plant in Hayward, California. UV equipment is made in the company's plant near Chicago. Sales offices are maintained in New York, Illinois, and California in the USA, and in Germany, Japan, Australia, Italy, Israel, and Sweden. Complete testing and pilot facilities are available in Hayward (EB) and near Chicago (UV). Described below are the basic system components, applications and advantages of RPC's UV and EB systems. (orig.)

  14. Improvements in remote equipment torquing and fastening

    International Nuclear Information System (INIS)

    Garin, J.

    1978-01-01

    Remote torquing and fastening is a requirement of generic interest for application in an environment not readily accessible to man. The developments over the last 30 years in torque-controlled equipment above 200 nm (150 ft/lb) have not been emphasized. The development of specialized subassemblies to torque and fasten equipment in a remotely controlled environment is an integral part of the Advanced Fuel Recycle Program at Oak Ridge National Laboratory. Commercially available subassemblies have been adapted into a system that would provide remote torquing and fastening in the range of 200 to 750 nm (150 to 550 ft/lb). 9 figures

  15. Underwater fuel handling equipment maintenance. Verification of design assumptions, specific problems and tools, case study

    International Nuclear Information System (INIS)

    Kurek, J.B.

    1995-01-01

    The majority of CANDU Fuel Transfer System equipment at Pickering is located under fourteen feet of water, as dictated by the containment and shielding requirements. Such arrangement, however, creates specific problems with equipment maintenance. Each single piece of equipment serves two generating units, which means in case of defect- double losses on production, or two units shut down simultaneously for planned maintenance. The requirement for underwater maintenance was not anticipated at the design stage, which multiples the level of difficulty, and creates requirement for developing special tools for each work. Removal of the damaged fuel from the receiving bays and decontamination of submerged equipment is also part of the problem. The purpose of this presentation is to share our experience with the designers, operators, maintenance mechanics and technical personnel of the other CANDU generating stations

  16. Assessment of the causes of failures of roto-dynamic equipment in Cirus

    International Nuclear Information System (INIS)

    Rao, K.N.; Singh, S.; Ganeshan, P.

    1994-01-01

    As a part of Cirus reactor life extension program study, a service life evaluation of critical roto-dynamic equipment in Cirus such as primary coolant pumps, and their concrete foundation structures, pressurised water loop pumps, main air compressors and supply and exhaust fans, was performed. An assessment of the causes of failures of roto-dynamic equipment in Cirus was done. Based on assessment of the degradation mitigating features and comparison to similar roto-dynamic equipment and their concrete foundation structures, it was concluded that life extension of these roto-dynamic equipment and their structures is feasible. To support this conclusion a program involving: a) non-destructive testing, b) surveillance and monitoring and, c) preventive maintenance is recommended. (author). 4 refs

  17. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  18. UV Tanning Equipment | Radiation Protection | US EPA

    Science.gov (United States)

    2017-08-07

    Sun lamps and tanning equipment emit ultraviolet (UV) rays. People who are exposed to UV rays over a long period of time are more likely to develop skin cancer. People with light skin are in more danger because their skin is more sensitive to UV rays.

  19. TECHNICAL EQUIPMENT FOR SORTING APPLES BY SIZE

    Directory of Open Access Journals (Sweden)

    Vasilica Ştefan

    2012-01-01

    Full Text Available Need to increase the competitiveness of semi-subsistence farms, by valorisation of the fruits, led to research for designing of an equipment for sorting apples by size, in order to meet market requirement, pricing according to the size of the fruits.

  20. 49 CFR 374.313 - Equipment.

    Science.gov (United States)

    2010-10-01

    .... Each bus (except in commuter service) seating more than 14 passengers (not including the driver) shall..., DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS PASSENGER CARRIER REGULATIONS Adequacy of Intercity Motor Common Carrier Passenger Service § 374.313 Equipment. (a) Temperature control. A...