  1. The status of improved pressurized heavy water reactor development - A new option for PHWR -

    International Nuclear Information System (INIS)

    Park, Tae Keun; Yeo, Ji Won

    1996-03-01

    Currently, the 900 MWe class Improved Pressurized Heavy Water Reactor (PHWR), which is a type of CANDU reactor based on the systems and components of operating CANDU plants, is under development. The improved PHWR has a 480 fuel channel calandria, uses 37 element natural uranium fuel bundles and has a single unit containment. Adaptation of a steel-lined containment structure and improved containment isolation systems permit a reduced exclusion area boundary (EAB) compared to the existing larger capacity CANDU reactors (Darlington, Bruce B). The improved PHWR buildings are arranged to achieve minimum spacing between reactor units. Plant safety and economy are increased through various design changes based on the operating experience of existing CANDU plants. 4 refs. (Author)

  2. Aspects regarding the fuel management for PHWR nuclear reactors

    International Nuclear Information System (INIS)

    Dragusin, O.; Bobolea, A.; Voicu, A.

    2001-01-01

    Fuel management for PHWR nuclear reactors is completely different from the PWR reactors fuel management. PHWR reactor fuel loading procedures are repeated after an interval of time, as defined and specified in the project documentation, using a fuel machine that can be attached to the terminal fittings of horizontal pressure tubes while the reactor is a full power. Another aspect of fuel management policy is related to the possibility of bi-directional loading of the reactor, with the primary advantage of uniform and symmetrical characteristics. (authors)

  3. Mathematical modeling of CANDU-PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Gaber, F.A.; Aly, R.A.; El-Shal, A.O. [Atomic Energy Authority, Cairo (Egypt)

    2003-07-01

    The paper deals with the transient studies of CANDU 600 pressurized Heavy Water Reactor (PHWR). This study involved mathematical modeling of CANDU-PHWR to study its thermodynamic performances. Modeling of CANDU-PHWR was based on lumped parameter technique. The reactor model includes the neutronic, reactivity, and fuel channel heat transfer. The nuclear reactor power was modelled using the point kinetics equations with six groups of delayed neutrons and the reactivity feed back due to the changes in the fuel temperature and coolant temperature. The CANDU-PHWR model was coded in FORTRAN language and solved by using a standard numerical technique. The adequacy of the model was tested by assessing the physical plausibility of the obtained results. (author)

  4. Experience with valves for PHWR reactors

    International Nuclear Information System (INIS)

    Narayan, K.; Mhetre, S.G.

    1977-01-01

    Material specifications and inspection and testing requirements of the valves meant for use in nuclear reactors are mentioned. In the heavy water systems (both primary and moderator) of a PHWR type reactor, the valves used are gate valves, globe valves, diaphragm valves, butterfly valves, check valves and relief valves. Their locations and functions they perform in the Rajasthan Atomic Power Station Unit-1 are described. Experience with them is given. The major problems encountered with them have been : (1) leakage from the stem seals and body bonnet joint, (2) leakage due to failure of diaphragm and/or washout of the packing and (3) malfunctioning. Measures taken to solve these are discussed. Finally a mention has been made of improved versions of valves, namely, metal diaphragm valve and inverted relief valve. (M.G.B.)

  5. Irradiation tests on PHWR type fuel elements in TRIGA research reactor of INR Pitesti

    Energy Technology Data Exchange (ETDEWEB)

    Horhoianu, Grigore [Institute for Nuclear Research, Pitesti (Romania). Nuclear Fuel Engineering Lab.; Sorescu, Ion [Institute for Nuclear Research, Pitesti (Romania). TRIGA Reactor Loop Facility; Parvan, Marcel [Institute for Nuclear Research, Pitesti (Romania). Hot Cells Lab.

    2012-12-15

    Nine PHWR type fuel elements with reduced length were irradiated in loop A of the TRIGA Research Reactor of INR Pitesti. The primary objective of the test was to determine the performance of nuclear fuel fabricated at INR Pitesti at high linear powers in pressurized water conditions. Six fuel elements were irradiated with a ramp power history, achieving a maximum power of 45 kW/m during pre-ramp and of 64 kW/m in the ramp. The maximum discharge burnup was of 216 MWh/kgU. Another three fuel elements with reduced length were irradiated with declining power history. At the beginning of irradiation the fuel elements achieved a maximum linear power of 66 kW/m. The maximum fuel power was about 1.3 times the maximum expected in PHWR. The maximum discharge burnup was 205 MWh/kgU. The elements were destructively examined in the hot cells of INR Pitesti. Temperature-sensitive parameters such as UO{sub 2} grain growth, fission-gas release and sheath deformations were examined. The tests proved the feasibility of irradiating PHWR type fuel elements at linear powers up to 66 kW/m under pressurized water conditions and demonstrated the possibility of more flexible operation of this fuel in power reactors. This paper presents the results of the investigation. (orig.)

  6. Mathematical modeling of CANDU-PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Gaber, F.A.; Aly, R.A.; El-Shal, A.O. [Atomic Energy Authority, Cairo (Egypt)

    2001-07-01

    The paper deals with the transient studies of CANDU 600 pressurized Heavy Water Reactor (PHWR) system. This study involved mathematical modeling of CANDU PHWR major system components and the developments of software to study the thermodynamic performances. Modeling of CANDU-PHWR was based on lumped parameter technique.The integrated CANDU-PHWR model includes the neutronic, reactivity, fuel channel heat transfer, piping and the preheater type U-tube steam generator (PUTSG). The nuclear reactor power was modelled using the point kinetics equations with six groups of delayed neutrons and reactivity feed back due to the changes in fuel temperature and coolant temperature. The complex operation of the preheater type U-tube steam generator (PUTSG) is represented by a non-linear dynamic model using a state variable, moving boundary and lumped parameter techniques. The secondary side of the PUTSG model has six separate lumps including a preheater region, a lower boiling section, a mixing region, a riser, a chimmeny section, and a down-corner. The tube side of PUTSG has three main thermal zones. The PUTSG model is based on conservation of mass, energy and momentum relation-ships. The CANDU-PHWR integrated model are coded in FORTRAN language and solved by using a standard numerical technique. The adequacy of the model was tested by assessing the physical plausibility of the obtained results. (author)

  7. Performance of water cooled nuclear power reactor fuels in India – Defects, failures and their mitigation

    International Nuclear Information System (INIS)

    Ganguly, Chaitanyamoy

    2015-01-01

    Water cooled and moderated nuclear power reactors account for more than 95% of the operating reactors in the world today. Light water reactors (LWRs) consisting of pressurized water reactor (PWR), their Russian counterpart namely VVER and boiling water reactor (BWR) will continue to dominate the nuclear power market. Pressurized heavy water reactor (PHWR), also known as CANDU, is the backbone of the nuclear power program in India. Updates on LWR and PHWR fuel performance are being periodically published by IAEA, OECD-NEA and the World Nuclear Association (WNA), highlighting fuel failure rate and the mitigation of fuel defects and failures. These reports clearly indicate that there has been significant improvement in in – pile fuel performance over the years and the present focus is to achieve zero fuel failure in high burn up and high performance fuels. The present paper summarizes the status of PHWR and LWR fuel performance in India, highlighting the manufacturing and the related quality control and inspection steps that are being followed at the PHWR fuel fabrication plant in order to achieve zero manufacturing defect which could contribute to achieving zero in – pile failure rate in operating and upcoming PHWR units in India. (author)

  8. Tritium accounting for PHWR plants

    International Nuclear Information System (INIS)

    Nair, P.S.; Duraisamy, S.

    2012-01-01

    Tritium, the radioactive isotope of hydrogen, is produced as a byproduct of the nuclear reactions in the nuclear power plants. In a Pressurized Heavy Water Reactor (PHWR) tritium activity is produced in the Heat Transport and Moderator systems due to neutron activation of deuterium in heavy water used in these systems. Tritium activity build up occurs in some of the water systems in the PHWR plants through pick up from the plant atmosphere, inadvertent D 2 O ingress from other systems or transfer during processes. The tritium, produced by the neutron induced reactions in different systems in the reactor undergoes multiple processes such as escape through leaks, storage, transfer to external locations, decay, evaporation and diffusion and discharge though waste streams. Change of location of tritium inventory takes place during intentional transfer of heavy water, both reactor grade and downgraded, from one system to another. Tritium accounting is the application of accounting techniques to maintain knowledge of the tritium inventory present in different systems of a facility and to construct activity balances to detect any discrepancy in the physical inventories. It involves identification of all the tritium hold ups, transfers and storages as well as measurement of tritium inventories in various compartments, decay corrections, environmental release estimations and evaluation of activity generation during the accounting period. This paper describes a methodology for creating tritium inventory balance based on periodic physical inventory taking, tritium build up, decay and release estimations. Tritium accounting in the PHWR plants can prove to be an effective regulatory tool to monitor its loss as well as unaccounted release to the environment. (author)

  9. Development of advanced CANDU PHWR -Development of the advanced CANDU technology-

    International Nuclear Information System (INIS)

    Seok, Ho Cheon; Na, Yeong Hwan; Seok, Soo Dong; Lee, Bo Uk; Kwak, Ho Sang; Kim, Bong Ki; Kim, Seok Nam; Min, Byeong Joo; Park, Jong Ryunl; Shin, Jeong Cheol; Lee, Kyeong Ho; Lee, Dae Hee; Lee, Deuk Soo; Lee, Yeong Uk; Lee, Jeong Yang; Jwon, Jong Seon; Jwon, Chang Joon; Ji, Yong Kwan; Han, Ki Nam; Kim, Kang Soo; Kim, Dae Jin; Kim, Seon Cheol; Kim, Seong Hak; Kim, Yeon Seung; Kim, Yun Jae; Kim, Jeong Kyu; Kim, Jeong Taek; Kim, Hang Bae; Na, Bok Kyun; Namgung, In; Moon, Ki Hwan; Park, Keun Ok; Shon, Ki Chang; Song, In Ho; Shin, Ji Tae; Yeo, Ji Won; Oh, In Seok; Jang, Ik Ho; Jeong, Dae Won; Jeong, Yong Hwan; Ha, Jae Hong; Ha, Jeong Koo; Hong, Hyeong Pyo; Hwang, Jeong Ki

    1994-07-01

    The target of this project is to assess the feasibility of improving PHWR and to establish the parameter of the improved concept and requirements for developing it. To set up the requirements for the Improved Pressurized Heavy Water Reactor: (1) Design requirements of PHWR main systems and Safety Design Regulatory Requirements for Safety Related System i.e. Reactor Shutdown System, Emergency Core Cooling System and Containment System were prepared. (2) Licensing Basis Documents were summarized and Safety Analysis Regulatory. Requirements were reviewed and analyzed. To estimate the feasibility of improving PHWR and to establish the main parameters of the concept of new PHWR in future: (1) technical level/developing trend of PHWR in Korea through Wolsong 2, 3 and 4 design experience and Technical Transfer Program was investigated to analyze the state of basic technology and PHWR improvement potential. (2) CANDU 6 design improvement tendency, CANDU 3 design concept and CANDU 9 development state in other country was analyzed. (3) design improvement items to apply to the reactors after Wolsong 2, 3 and 4 were selected and Plant Design Requirements and Conceptual Design Description were prepared and the viability of improved HWR was estimated by analyzing economics, performance and safety. (4) PHWR technology improving research and development plan was established and international joint study initiated for main design improvement items

  10. Secondary cycle water chemistry for 500 MWe pressurised heavy water reactor (PHWR) plant: a case study

    International Nuclear Information System (INIS)

    Bhandakkar, A.; Subbarao, A.; Agarwal, N.K.

    1995-01-01

    In turbine and secondary cycle system of 500 MWe PHWR, chemistry of steam and water is controlled in secondary cycle for prevention of corrosion in steam generators (SGs), feedwater system and steam system, scale and deposit formation on heat transfer surfaces and carry-over of solids by steam and deposition on steam turbine blades. Water chemistry of secondary side of SGs and turbine cycle is discussed. (author). 8 refs., 2 tabs., 1 fig

  11. PHWR Fuel - an integrated approach in Indian context

    International Nuclear Information System (INIS)

    Jayaraj, R.N.

    2008-01-01

    The nuclear power programme in India is based on a three-stage approach in which the Pressurized Heavy Water Reactors (PHWR) forms the backbone of the first stage. Over the years, apart from gaining expertise in design, construction and operation of PHWRs, innovative fuel designs and manufacturing technologies have also been evolved. Presently, thirteen PHWR 220 units and two PHWR 540 units are in operation. Three more PHWR 220 units are in the advanced stage of construction. In addition, the PHWR power generation programme envisages construction of eight more PHWR 700 units. Nuclear Fuel Complex (NFC) at Hyderabad, established in early 70s, is the only manufacturer of fuel and reactor core structurals for all the PHWRs in India. Since inception, the thrust has been on indigenous development of technology in the areas of production processes, equipment manufacture and quality assurance programmes. Commensurate with the PHWR programme, NFC has expanded its production capacities and has fabricated more than 380,000 fuel bundles since inception. Towards optimization of uranium resources and implementation of 'closed fuel cycle' concept, large quantities of reprocessed uranium fuel bundles have been manufactured and introduced in the initial cores of PHWRs. In recent times, NFC introduced several modifications in the production processes like vapour ammonia precipitation for UO 2 powder production, advanced resistance welding controls and improved versions of welding machines, which all have facilitated in improving the quality and productivity of the fuel. Superior quality control systems like spectrophotometric determination of SSA of UO 2 powders, machine vision systems for pellet inspection, thermography for evaluating weld integrity, etc. has channelised NDT techniques into fuel production lines. The paper summarizes various improvements carried out in the design and manufacture of PHWR fuel. New concepts evolved in high burn-up fuels and development of state

  12. Direct harvesting of Helium-3 (3He) from heavy water nuclear reactors

    International Nuclear Information System (INIS)

    Bentoumi, G.; Didsbury, R.; Jonkmans, G.; Rodrigo, L.; Sur, B.

    2013-01-01

    The thermal neutron activation of deuterium inside a heavy-water-moderated or -cooled nuclear reactor produces a build-up of tritium in the heavy water. The in situ decay of tritium can, for certain reactor types and operating conditions, produce potentially useable amounts of 3 He, which can be directly extracted via the heavy-water cover gas without first separating, collecting and storing tritium outside the reactor. It is estimated that the amount of 3 He available for recovery from the moderator cover gas of a 700 MWe class Pressurized Heavy Water Reactor (PHWR) ranges from 0.1 to 0.7 m 3 (STP) per annum, varying with the tritium activity buildup in the moderator. The harvesting of 3 He would generate approximately 12.7 m 3 (STP) of 3 He, worth more than $30M at current market rates, over a typical 25-year operating cycle of the PHWR. This paper discusses the production of 3 He in the moderator of a PHWR and its extraction from the 4 He moderator cover gas system using conventional methods. (author)

  13. NERON-Computing system for PHWR reactor cells and heterogeneous parameter calculations

    International Nuclear Information System (INIS)

    Cristian, I.; Cirstoiu, B.; Slavnicu, S.D.

    1976-04-01

    A system of codes for PHWR type reactors is presented. The system includes the cell code NERO and a code PARETE for monopolar and dipolar heterogeneous calculations. A general theory of dipolar flux is necessary for a more accurate evaluation of void coefficient and diffusion moderator coefficient is given. The determination of monopolar and dipolar heterogeneous parameters is very useful for heterogeneous methods developped especially for HWR reactors during the last years. (author)

  14. Water chemistry features of advanced heavy water reactor

    International Nuclear Information System (INIS)

    Sriram, Jayasree; Vijayan, K.; Kain, Vivekanad; Velmurugan, S.

    2015-01-01

    Advanced Heavy Water Reactor (AHWR) being designed in India proposes to use Plutonium and Thorium as fuel. The objective is to extract energy from the uranium-233 formed from Thorium. It is a heavy water moderated and light water cooled tube type boiling water reactor. It is a heavy water moderated and light water cooled tube type boiling water reactor. It is a natural circulation reactor. Thus, it has got several advanced passive safety features built into the system. The various water coolant systems are listed below. i) Main Heat transport System ii) Feed water system iii) Condenser cooling system iv) Process water system and safety systems. As it is a tube type reactor, the radiolysis control differs from the normal boiling water reactor. The coolant enters the bottom of the coolant channel, boiling takes place and then the entire steam water mixture exits the core through the long tail pipes and reaches the moisture separator. Thus, there is a need to devise methods to protect the tail pipes from oxidizing water chemistry condition. Similarly, the moderator heavy water coolant chemistry differs from that of moderator system chemistry of PHWR. The reactivity worth per ppm of gadolinium and boron are low in comparison to PHWR. As a result, much higher concentration of neutron poison has to be added for planned shutdown, start up and for actuating SDS-2. The addition of higher concentration of neutron poison result in higher radiolytic production of deuterium and oxygen. Their recombination back to heavy water has to take into account the higher production of these gases. This paper also discusses the chemistry features of safety systems of AHWR. In addition, the presentation will cover the chemistry monitoring methodology to be implemented in AHWR. (author)

  15. PHWR Fuel - an integrated approach in Indian context

    Energy Technology Data Exchange (ETDEWEB)

    Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderabad (India)

    2008-07-01

    The nuclear power programme in India is based on a three-stage approach in which the Pressurized Heavy Water Reactors (PHWR) forms the backbone of the first stage. Over the years, apart from gaining expertise in design, construction and operation of PHWRs, innovative fuel designs and manufacturing technologies have also been evolved. Presently, thirteen PHWR 220 units and two PHWR 540 units are in operation. Three more PHWR 220 units are in the advanced stage of construction. In addition, the PHWR power generation programme envisages construction of eight more PHWR 700 units. Nuclear Fuel Complex (NFC) at Hyderabad, established in early 70s, is the only manufacturer of fuel and reactor core structurals for all the PHWRs in India. Since inception, the thrust has been on indigenous development of technology in the areas of production processes, equipment manufacture and quality assurance programmes. Commensurate with the PHWR programme, NFC has expanded its production capacities and has fabricated more than 380,000 fuel bundles since inception. Towards optimization of uranium resources and implementation of 'closed fuel cycle' concept, large quantities of reprocessed uranium fuel bundles have been manufactured and introduced in the initial cores of PHWRs. In recent times, NFC introduced several modifications in the production processes like vapour ammonia precipitation for UO{sub 2} powder production, advanced resistance welding controls and improved versions of welding machines, which all have facilitated in improving the quality and productivity of the fuel. Superior quality control systems like spectrophotometric determination of SSA of UO{sub 2} powders, machine vision systems for pellet inspection, thermography for evaluating weld integrity, etc. has channelised NDT techniques into fuel production lines. The paper summarizes various improvements carried out in the design and manufacture of PHWR fuel. New concepts evolved in high burn-up fuels and

  16. Consolidating indigenous capability for PHWR fuel manufacturing in India

    Energy Technology Data Exchange (ETDEWEB)

    Jayaraj, R.N., E-mail: cenfc@nfc.gov.in [Nuclear Fuel Complex, Dept. of Atomic Energy, Government of India, Hyderabad (India)

    2010-07-01

    Since inception of Nuclear Power Programme in India greater emphasis was laid on total self- reliance in Fuel manufacturing. For Pressurized Heavy Water Reactors (PHWRs), which forms a base for the first stage of the programme, an integrated approach was adopted encompassing different areas of expertise -Design, Construction and Operation of PHWRs; Heavy Water production and Fuel Design and Manufacturing technologies. For the first PHWR constructed about 35 years back with the Canadian collaboration, known as Rajasthan Atomic Power Station (RAPS), half the core requirement of fuel was met from the fuel manufactured for the first time in India. Since then the fuel production capabilities were enhanced by setting up an industrial scale fuel manufacturing facility - Nuclear Fuel Complex (NFC) at Hyderabad, India during early '70s. NFC has been continuously expanding its capacities to meet the fuel demand of all the PHWRs constructed and operated by Nuclear Power Corporation of India Limited (NPCIL). Presently, fifteen PHWR 220 MWe units and two PHWR 540 MWe units are in operation and one more PHWR 220 MWe unit is in advanced stage of commissioning in India. While continuously engaged in the manufacture of fuel for these reactors, NFC has been upgrading the production lines with new processes and quality assurance systems. In order to multiply the production capacities, NFC has embarked on developing indigenous capability for design and building of special purpose process equipment for Uranium dioxide powder production, pelletisation and final assembly operations. Some of the equipment having state-of-the-art features includes dryers/furnaces for UO{sub 2} powder, presses/ sintering furnaces for pelletisation and resistance welding equipment/ machining stations for assembly operations. In addition, several campaigns were taken over the years for manufacturing PHWR fuel bundles containing reprocessed Uranium, Thoria and slightly enriched Uranium. The paper

  17. Consolidating indigenous capability for PHWR fuel manufacturing in India

    International Nuclear Information System (INIS)

    Jayaraj, R.N.

    2010-01-01

    Since inception of Nuclear Power Programme in India greater emphasis was laid on total self- reliance in Fuel manufacturing. For Pressurized Heavy Water Reactors (PHWRs), which forms a base for the first stage of the programme, an integrated approach was adopted encompassing different areas of expertise -Design, Construction and Operation of PHWRs; Heavy Water production and Fuel Design and Manufacturing technologies. For the first PHWR constructed about 35 years back with the Canadian collaboration, known as Rajasthan Atomic Power Station (RAPS), half the core requirement of fuel was met from the fuel manufactured for the first time in India. Since then the fuel production capabilities were enhanced by setting up an industrial scale fuel manufacturing facility - Nuclear Fuel Complex (NFC) at Hyderabad, India during early '70s. NFC has been continuously expanding its capacities to meet the fuel demand of all the PHWRs constructed and operated by Nuclear Power Corporation of India Limited (NPCIL). Presently, fifteen PHWR 220 MWe units and two PHWR 540 MWe units are in operation and one more PHWR 220 MWe unit is in advanced stage of commissioning in India. While continuously engaged in the manufacture of fuel for these reactors, NFC has been upgrading the production lines with new processes and quality assurance systems. In order to multiply the production capacities, NFC has embarked on developing indigenous capability for design and building of special purpose process equipment for Uranium dioxide powder production, pelletisation and final assembly operations. Some of the equipment having state-of-the-art features includes dryers/furnaces for UO 2 powder, presses/ sintering furnaces for pelletisation and resistance welding equipment/ machining stations for assembly operations. In addition, several campaigns were taken over the years for manufacturing PHWR fuel bundles containing reprocessed Uranium, Thoria and slightly enriched Uranium. The paper summarises

  18. Growth scenarios with thorium fuel cycles in pressurised heavy water reactors

    International Nuclear Information System (INIS)

    Balakrishnan, M.R.

    1991-01-01

    Since India has generous deposits of thorium, the availability of thorium will not be a limiting factor in any growth scenario. It is fairly well accepted that the best system for utilisation of thorium is the heavy water reactor. The growth scenarios possible using thorium in HWRs are considered. The base has been taken as 50,000 tons of natural uranium and practically unlimited thorium. The reference reactor has been assumed to be the PHWR, and all other growth scenarios are compared with the growth scenario provided by the once-through natural cycle in the PHWR. Two reactor types have been considered: the heavy water moderated, heavy water cooled, pressure tube reactor, known as the PHWR; and the heavy water moderated and cooled pressure vessel kind, similar to the ATUCHA reactor in Argentina. For each reactor, a number of different fuel cycles have been studied. All these cycles have been based on thorium. These are: the self-sustaining equilibrium thorium cycle (SSET); the high conversion ratio high burnup cycle; and the once through thorium cycle (OTT). The cycle have been initiated in two ways: one is by starting the cycle with natural uranium, reprocessing the spent fuel to obtain plutonium, and use that plutonium to initiate the thorium cycle; the other is to enrich the uranium to about 2-3% U-235 (the so-called Low Enriched Uranium or LEU), and use the LEU to initiate the thorium cycle. Both cases have been studied, and growth scenarios have been projected for every one of the possible combinations. (author). 1 tab

  19. Process systems of PHWR - Indian experience

    Energy Technology Data Exchange (ETDEWEB)

    Ramandan, T S.V. [Madras Atomic Power Station (MAPS), Madras (India)

    1991-04-01

    Three operational problems are discussed in this paper. The reactors in Madras Atomic Power Station (MAPS), India are Pressurised Heavy Water Reactors PHWR), similar to Douglas Point PGS. The moderator heavy water is pumped into the bottom half of the calandria (horizontal reactor vessel) through one inlet manifold plenum chamber and horizontal louvers which help to distribute the moderator evenly at a very low velocity. The outlet from the calandria is through a smaller manifold structure at a higher elevation. The moderator is held on the shell side of the calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The primary coolant system consists of 306 coolant channels containing the fuel and steam generators (SGs) and pumps on either side of the reactor. Each SC consists of 11 Nos. inverted U tube vertical heat exchangers where heat is transferred from primary coolant heavy water to secondary light water to produce steam. (author)

  20. Process systems of PHWR - Indian experience

    International Nuclear Information System (INIS)

    Ramandan, T.S.V.

    1991-01-01

    Three operational problems are discussed in this paper. The reactors in Madras Atomic Power Station (MAPS), India are Pressurised Heavy Water Reactors PHWR), similar to Douglas Point PGS. The moderator heavy water is pumped into the bottom half of the calandria (horizontal reactor vessel) through one inlet manifold plenum chamber and horizontal louvers which help to distribute the moderator evenly at a very low velocity. The outlet from the calandria is through a smaller manifold structure at a higher elevation. The moderator is held on the shell side of the calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The primary coolant system consists of 306 coolant channels containing the fuel and steam generators (SGs) and pumps on either side of the reactor. Each SC consists of 11 Nos. inverted U tube vertical heat exchangers where heat is transferred from primary coolant heavy water to secondary light water to produce steam. (author)

  1. Power distribution monitoring and control in 500 MWe PHWR

    International Nuclear Information System (INIS)

    Kumar, A.

    1996-01-01

    The 500 MWe Indian Pressurized Heavy Water Reactor (PHWR) is expected to be commissioned in a few years. It has a relatively large sized core with complex material distribution in comparison to the currently operating 220 MWe PHWRs. The resulting neutronically loosely coupled system demands continuous control of the core power distribution. This paper gives a brief description and analysis of the reactor monitoring and control system proposed for this reactor. (author). 11 refs, 8 figs, 3 tabs

  2. Studies on water quality parameters due to operation of PHWR at KAPS

    International Nuclear Information System (INIS)

    Jha, Mukesh; John, Jaison T.; Joshi, C.P.; Vyas, P.V.; Hegde, A.G.

    2005-01-01

    The paper elucidates the effect of water quality due to operation of Pressurised Heavy Water Reactor located at Kakrapar as water is the essential commodity for all living beings. It is the main concern in recent times for environmental protection, there is a pressure on all type of industries including nuclear power stations to discharge various types of effluents in such a manner that pollution in surrounding environment is kept to the minimum. Owing the wastewater discharge modes of Kakrapar atomic power station behavior of effluents resulting impact on environment and general public will be guided by the water quality of the aquatic system. To ensure the quality of water, the study of water quality parameters are taken up and the investigated parameters showed no degradation in ecosystem due to the operation of PHWR at KAPS. (author)

  3. Detection of gaseous heavy water leakage points in CANDU 6 pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Park, T-K.; Jung, S-H.

    1996-01-01

    During reactor operation, the heavy water filled primary coolant system in a CANDU 6 Pressurized Heavy Water (PHWR) may leak through routine operations of the plant via components, mechanical joints, and during inadvertent operations etc. Early detection of leak points is therefore important to maintain plant safety and economy. There are many independent systems to monitor and recover heavy water leakage in a CANDU 6 PHWR. Methodology for early detection based on operating experience from these systems, is investigated in this paper. In addition, the four symptoms of D 2 O leakage, the associated process for clarifying and verifying the leakage, and the probable points of leakage are discussed. (author)

  4. Quality evaluation of PHWR fuel element end cap weld joints by ultrasonic testing technique

    Energy Technology Data Exchange (ETDEWEB)

    Singh, J L; Nair, V R; Ramadasan, E; Majumdar, S; Sahoo, K C [Bhabha Atomic Research Centre, Bombay (India). Radiometallurgy Div.; Kumar, Arun [Atomic Fuel Fabrication Facility, Tarapur (India)

    1994-12-31

    An ultrasonic testing technique has been developed for effective quality evaluation of Pressurised Heavy Water Reactor (PHWR) fuel end plug welds. A focused high frequency shear wave is directed to the weld zone from half skip distance to detect lack of fusion, porosities and wall cracks in the weld zone. A tentative select/reject level has been evolved to sort out the defective weld by examining more than 700 PHWR fuel pin welds. (author). 5 refs., 5 figs.

  5. Status of generic actions items and safety analysis system of PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Joo Hwan; Min, Byung Joo

    2001-05-01

    This report described the review results of a GAIs(Generic Action Item) currently issued on safety analysis of PHWR(Pressurized Heavy Water Reactor) and the research activities and positions to solve the GAIs in each country which possess PHWRs. eviewing the Final Safety Analysis Report for Wolsong-2/3/4 Units, the safety analysis methodology, classification for accident scenarios, safety analysis codes, their interface, etc.. were described. From the present review report, it is intended to establish the CANDU safety analysis system by providing the better understandings and development plans for the safety analysis of PHWR. esults.

  6. Water treatment for 500 MWe PHWR plants

    International Nuclear Information System (INIS)

    Vasist, Sudheer; Sharma, M.C.; Agarwal, N.K.

    1995-01-01

    Large quantities of treated water is required for power generation. For a typical 500 MWe PHWR inland station with cooling towers, raw water at the rate of 6000 m 3 /hr is required. Impurities in cooling water give rise to the problems of corrosion, scaling, microbiological contamination, fouling, silical deposition etc. These problems lead to increased maintenance cost, reduced heat transfer efficiency, and possible production cut backs or shutdowns. The problems in coastal based power plants are more serious because of the highly corrosive nature of sea water used for cooling. An overview of the cooling water systems and water treatment method is enumerated. (author). 2 refs., 1 fig

  7. The heavy water reactors

    International Nuclear Information System (INIS)

    Brudermueller, G.

    1976-01-01

    This is a survey of the development so far of this reactor line which is in operation all over the world in various types (e.g. BHWR, PHWR). MZFR and the CANDU-type reactors are discussed in more detail. (UA) [de

  8. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  9. Integrated probabilistic assessment for DHC initiation, growth and leak-before-break of PHWR pressure tubes

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Young-Jin [Power Engineering Research Institute, KEPCO Engineering and Construction, 188 Gumi-dong, Bundang-gu, Seongnam-si, Gyeonggi-do 463-870 (Korea, Republic of); Chang, Yoon-Suk, E-mail: yschang@khu.ac.kr [Department of Nuclear Engineering, Kyung Hee University, 1732 Deogyeong-daero, Giheung-gu, Yongin-si, Gyeonggi-do 446-701 (Korea, Republic of)

    2014-08-15

    Highlights: • We develop an integrated approach for probabilistic assessment of PHWR pressure tube. • We examine probabilities of DHC initiation, growth, penetration and LBB failure. • The proposed approach is helpful to calculate rupture probabilities in reactor flaws even in the case of very low rupture probability. - Abstract: A few hundred zirconium alloy pressure tubes in a pressurized heavy water reactor (PHWR) serve as the nuclear fuel channel, as well as the reactor coolant pressure boundary. The pressure tubes are inspected periodically and a fitness-for-service assessment (FFSA) must be conducted if any flaw is detected in the inspection. A Canadian standard provides FFSA procedures of PHWR pressure tubes, which include probabilistic assessment for flaws considering delayed hydride cracking (DHC) and leak-before-break (LBB). In the present study, an integrated approach with detailed stepwise calculation procedures and integration methodology for probabilistic assessment of pressure tube was developed. In the first step of this approach, a probability of the DHC initiation, growth and penetration for single initial flaw is calculated. In the next step, a probability of LBB failure, which means tube rupture, for single through-wall crack (TWC) is calculated. Finally, a rupture probability for all initial flaws in a reactor can be calculated using the penetration probability for single flaw and the LBB failure probability for single TWC, as well as the predicted total number of initial flaw in the reactor.

  10. Integrated probabilistic assessment for DHC initiation, growth and leak-before-break of PHWR pressure tubes

    International Nuclear Information System (INIS)

    Oh, Young-Jin; Chang, Yoon-Suk

    2014-01-01

    Highlights: • We develop an integrated approach for probabilistic assessment of PHWR pressure tube. • We examine probabilities of DHC initiation, growth, penetration and LBB failure. • The proposed approach is helpful to calculate rupture probabilities in reactor flaws even in the case of very low rupture probability. - Abstract: A few hundred zirconium alloy pressure tubes in a pressurized heavy water reactor (PHWR) serve as the nuclear fuel channel, as well as the reactor coolant pressure boundary. The pressure tubes are inspected periodically and a fitness-for-service assessment (FFSA) must be conducted if any flaw is detected in the inspection. A Canadian standard provides FFSA procedures of PHWR pressure tubes, which include probabilistic assessment for flaws considering delayed hydride cracking (DHC) and leak-before-break (LBB). In the present study, an integrated approach with detailed stepwise calculation procedures and integration methodology for probabilistic assessment of pressure tube was developed. In the first step of this approach, a probability of the DHC initiation, growth and penetration for single initial flaw is calculated. In the next step, a probability of LBB failure, which means tube rupture, for single through-wall crack (TWC) is calculated. Finally, a rupture probability for all initial flaws in a reactor can be calculated using the penetration probability for single flaw and the LBB failure probability for single TWC, as well as the predicted total number of initial flaw in the reactor

  11. Production of gadolinium nitrate for TAPS 3 and 4 PHWR

    International Nuclear Information System (INIS)

    Mishra, S.L.; Ramakrishnan, P.; Iyer, N.S.; Singh, Harvinderpal

    2004-01-01

    In India, gadolinium nitrate is being used for the first time in PHWR at Tarapur. Gadolinium is preferred over boron due to high neutron cross section and the water soluble nitrate form works efficiently for reactivity control through moderator liquid poison addition system (MLPS) as well as for reactor shut down system (SDS2). Low concentration of gadolinium (0.1-0.2 g/l) in heavy water is sufficient to shut down the reactor in a very short time. After use, the small amount of gadolinium can be separated quickly from heavy water by ion exchange process. In this paper separation of Gd using of 2-ethyl hexyl phosphoric acid mono 2-ethyl hexyl ester EHEHPA as an extractant has been described

  12. Dynamic Analysis of Coolant Channel and Its Internals of Indian 540 MWe PHWR Reactor

    Directory of Open Access Journals (Sweden)

    A. Rama Rao

    2008-04-01

    Full Text Available The horizontal coolant channel is one of the important parts of primary heat transport system in PHWR type of reactors. There are in all 392 channels in the core of Indian 540 MWe reactor. Each channel houses 13 natural uranium fuel bundles and shielding and sealing plugs one each on either side of the channel. The heavy water coolant flows through the coolant channel and carries the nuclear heat to outside the core for steam generation and power production in the turbo-generator. India has commissioned one 540 MWe PHWR reactor in September 2005 and another similar unit will be going into operation very shortly. For a complete dynamic study of the channel and its internals under the influence of high coolant flow, experimental and modeling studies have been carried out. A good correlation has been achieved between the results of experimental and analytical models. The operating life of a typical coolant channel typically ranges from 10 to 15 full-power years. Towards the end of its operating life, its health monitoring becomes an important activity. Vibration diagnosis plays an important role as a tool for life management of coolant. Through the study of dynamic characteristics of the coolant channel under simulated loading condition, an attempt has been made to develop a diagnostics to monitor the health of the coolant channel over its operating life. A study has been also carried out to characterize the fuel vibration under different flow condition.

  13. Introduction of developing a list of MSO generic scenarios for PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Wan; Park, Jun Hyun; Bae, Hui Soo [STANDARD Testing and Engineering Ing. Ltd, Daejeon (Korea, Republic of)

    2016-10-15

    Multiple Spurious Operation(MSO) scenarios should contain scenarios threatening Post-fire safe shutdown function by MSO of Safe Shutdown Equipments(SSEs) as well as Non-SSEs. The list of MSO generic scenarios(NEI 00-01, Appendix G) was developed by industrial survey. Although not all scenarios of the list of MSO generic scenarios(NEI 00-01, Appendix G) are considered applicable to every reactor type, this list provides an input about MSO identification and treatment process. If NEI 00-01 is applied to other reactor type, analyst should review applicability of the list of generic scenarios(NEI 00-01, Appendix G) and consider potential MSO scenarios undescribed in the list of MSO generic scenarios(NEI 00-01, Appendix G). Especially, in PHWR case, there is no list of MSO generic scenarios in Canada or internationally. There are substantial physical variations between NPPs. So some generic scenarios(NEI 00-01, Appendix G) would need validation. Nevertheless, industrial stakeholder have not did any MSO work until now. In this paper, results of first stage research that develop the list of MSO generic scenarios for pressurized heavy water reactor(PHWR) is introduced. According to the review results, specific review of the list of MSO generic scenarios(NEI 00-01, Appendix G) is required such as how it applies to PHWR. And criteria was established for review of availability of the list of generic scenarios(NEI 00-01, Appendix G). However there are still many tasks such as potential scenario review, risk model review and expert panel review.

  14. Trend of R and D publications in pressurised heavy water reactors: A study using INIS and other databases

    International Nuclear Information System (INIS)

    Kumar, V.; Kalyane, V.L.; Prakasan, E.R.; Kumar, A.; Sagar, A.; Mohan, L.

    2004-01-01

    Digital databases INIS (1970-2002), INSPEC (1969-2002), Chemical Abstracts (1977-2002), ISMEC (1973-June 2002), Web of Sciences (1974-2002), and Science Citation Index (1982-2002), were used for comprehensive retrieval of bibliographic details of research publications on Pressurized Heavy Water Reactor (PHWR) research. Among the countries contributing to PHWR research, India (having 1737 papers) is the forerunner followed by Canada (1492), Romania (508) and Argentina (334). Collaboration of Canadian researchers with researchers of other countries resulted in 75 publications. Among the most productive researchers in this field, the first 15 are from India. Top three contributors to PHWR publications with their respective authorship credits are: H.S. Kushwaha (106), Anil Kakodkar (100) and V. Venkat Raj (76). Prominent interdomainary interactions in PHWR subfields are: Specific nuclear reactors and associated plants with General studies of nuclear reactors (481), followed by Environmental sciences (185), and Materials science (154). Number of publications dealing with Geosciences aspect of environmental sciences are 141. Romania, Argentina, India and Republic of Korea have used mostly (≥75%) non-conventional media for publications. Out of the 4851 publications, 1228 have been published in 292 distinct journals. Top most journals publishing PHWR papers are: Radiation Protection and Environment (continued from: Bulletin of Radiation Protection since 1997), India (115); Nuclear Engineering International, UK (84); and Transactions of the American Nuclear Society, USA (68). (author)

  15. Advanced methods for fabrication of PHWR and LMFBR fuels

    International Nuclear Information System (INIS)

    Ganguly, C.

    1988-01-01

    For self-reliance in nuclear power, the Department of Atomic Energy (DAE), India is pursuing two specific reactor systems, namely the pressurised heavy water reactors (PHWR) and the liquid metal cooled fast breeder reactors (LMFBR). The reference fuel for PHWR is zircaloy-4 clad high density (≤ 96 per cent T.D.) natural UO 2 pellet-pins. The advanced PHWR fuels are UO 2 -PuO 2 (≤ 2 per cent), ThO 2 -PuO 2 (≤ 4 per cent) and ThO 2 -U 233 O 2 (≤ 2 per cent). Similarly, low density (≤ 85 per cent T.D.) (UPu)O 2 pellets clad in SS 316 or D9 is the reference fuel for the first generation of prototype and commercial LMFBRs all over the world. However, (UPu)C and (UPu)N are considered as advanced fuels for LMFBRs mainly because of their shorter doubling time. The conventional method of fabrication of both high and low density oxide, carbide and nitride fuel pellets starting from UO 2 , PuO 2 and ThO 2 powders is 'powder metallurgy (P/M)'. The P/M route has, however, the disadvantage of generation and handling of fine powder particles of the fuel and the associated problem of 'radiotoxic dust hazard'. The present paper summarises the state-of-the-art of advanced methods of fabrication of oxide, carbide and nitride fuels and highlights the author's experience on sol-gel-microsphere-pelletisation (SGMP) route for preparation of these materials. The SGMP process uses sol gel derived, dust-free and free-flowing microspheres of oxides, carbide or nitride for direct pelletisation and sintering. Fuel pellets of both low and high density, excellent microhomogeneity and controlled 'open' or 'closed' porosity could be fabricated via the SGMP route. (author). 5 tables, 14 figs., 15 refs

  16. Use of artificial neural network in estimating channel power distribution of a 220 MWe PHWR

    International Nuclear Information System (INIS)

    Dubey, B.P.; Chandra, A.K.; Govindarajan, G.; Jagannathan, V.; Kataria, S.K.

    1998-01-01

    Knowledge of the distribution of power in all the 306 channels of a Pressurised Heavy Water Reactor (PHWR) as a result of the movement of one or more of the four regulating rods is important from the operation and maintenance point view of the reactor. Conventional computer codes available for this purpose take several minutes to calculate the channel power distribution on PC-AT/486. An Artificial Neural network (ANN), based on the RPROP algorithm has been developed and employed in predicting channel power distribution of a 220 MWe Indian PHWR as a result of a perturbation caused by the movement of one or more of the four regulating rods of the reactor. The ANN based system produces the result of an analysis much faster than that produced by a conventional computer code usually employed for this application. The ANN based system is rugged, accurate and fast, and therefore, has potential to be used in real-time applications. (author)

  17. Development of pre-startup equipment for light water reactors

    International Nuclear Information System (INIS)

    Ram, Rajit; Borkar, S.P.; Dixit, M.Y.; Das, Debashis; Patil, R.K.

    2010-01-01

    Light water reactor (LWR) core typically has high excess reactivity as compared to Pressurized Heavy Water Reactor (PHWR). Unlike PHWR, where online refueling is done, LWR is operated for a long period to achieve maximum fuel burn-up before refueling. Since the reactivity is always reducing with burn-up of the core, the positions of control rods at criticality are always changing in a single direction, i.e. away from the core. Therefore it is possible to start the LWR even if the nuclear instrumentation is not online, provided the criticality position of control rods is known for previous operation. However, for the very first startup, the criticality position of control rods is required to be determined. A special nuclear instrumentation system, called Pre-startup equipment (PSE) is developed using two numbers of in-core detectors along with the processing electronics. The PSE enables operators to determine the criticality position of control rods for the first startup at zero power. The same equipment can also be used during loading of fuel assemblies. This paper discusses the features and architecture of PSE, its individual circuit blocks and specifications. (author)

  18. Licensing assessment of the Candu Pressurized Heavy Water Reactor. Preliminary safety information document. Volume II

    International Nuclear Information System (INIS)

    1977-06-01

    ERDA has requested United Engineers and Constructors (UE and C) to evaluate the design of the Canadian natural uranium fueled, heavy water moderated (CANDU) nuclear reactor power plant to assess its conformance with the licensing criteria and guidelines of the U.S. Nuclear Regulatory Commission (USNRC) for light water reactors. This assessment was used to identify cost significant items of nonconformance and to provide a basis for developing a detailed cost estimate for a 1140 MWe, 3-loop Pressurized Heavy Water Reactor (PHWR) located at the Middletown, USA Site

  19. Performance of containment of Indian PHWR

    International Nuclear Information System (INIS)

    Mohan, Nalini; Ghadge, S.G.; Bajaj, S.S.

    2006-01-01

    This paper summarizes the various requirements and activities relevant to the testing of containment system of Indian Pressurized Heavy Water Reactor (PHWR). All Indian PHWR containments are constructed from concrete either reinforced or prestressed or a combination of both and lined with polymeric coating based on Epoxy or Vinyl in order to achieve the leak tightness necessary from the radiological considerations following an accident. The current concept includes a complete double containment (except the base raft) extended to all penetrations and some of the pipings (those open to the containment atmosphere). The primary containment fitted with a passive pressure suppression system is enveloped in the secondary containment (confinement) where slight vacuum is maintained during normal operation as well as post accident condition. The Integrated leakage Rate Test (ILRT) conducted so far on the containment indicate that the overall leakages from the containment are lower than those necessary to meet the radiological limits following a postulated accident and interception of leakages by secondary containment as per design. The details of the, tests, repairs carried out and observations are given in this paper. The experience of ILRT also indicate improvement in leak tightness in many areas. (author)

  20. Indian experience with radionuclide transport, deposition and decontamination in water-cooled nuclear power reactors

    International Nuclear Information System (INIS)

    Narasimhan, S.V.; Das, P.C.; Lawrence, D.A.; Mathur, P.K.; Venkateswarlu, K.S.

    1983-01-01

    The present generation of water-cooled nuclear reactors uses construction materials chosen with utmost care so that minimum corrosion occurs during the life of the reactor. As interaction between the primary coolant and the construction materials is unavoidable, the coolant is chemically treated to achieve maximum compatibility. First measurements of the chemical and radiochemical composition of the crud present on the in-core and out-of-core primary heat transport system surfaces of a pressurized heavy-water-moderated and cooled reactor (PHWR) are given; then experience in India in the development of a low temperature, one-stage decontaminating formulation for chemical decontamination of the radioactive deposits formed on stainless steel surfaces under BWR conditions is discussed. The effect of the magnitude of the transients in parameters such as reactor power, system temperature, dissolved oxygen content in the coolant, etc. on the nature and migration behaviour of primary heat transport system crud in a PHWR is described. Contributions to radioactive sources and insoluble crud from different primary heat transport system materials are identified and correlated with reactor operations in a PHWR. Man-rem problems faced by nuclear reactors, especially during off-line maintenance, stress the need for reducing the deposited radioactive sources from system surfaces which would otherwise be accessible. Laboratory and on-site experimentation was carried out to effect chemical decontamination on the radioactive deposits formed on the stainless steel surfaces under BWR conditions. Both the reducing and oxidizing formulations were subsequently used in a small-scale, in-plant trial in the clean-up system of a BWR. More than 85% of the deposited 60 Co activity was found to have been removed by the oxidizing formulation. Efforts to develop a decontaminating mixture containing a reducing agent with the help of a circulating loop are in progress in the laboratory. (author)

  1. Proceedings of 2nd PHWR operating safety experience meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage.

  2. Proceedings of 2nd PHWR operating safety experience meeting

    International Nuclear Information System (INIS)

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage

  3. Fission-product releases from a PHWR terminal debris bed

    Energy Technology Data Exchange (ETDEWEB)

    Brown, M.J.; Bailey, D.G., E-mail: morgan.brown@cnl.ca [Canadian Nuclear Laboratories, Chalk River, Ontario (Canada)

    2016-06-15

    During an unmitigated severe accident in a pressurized heavy water reactor (PHWR) with horizontal fuel channels, the core may disassemble and relocate to the bottom of the calandria vessel. The resulting heterogeneous in-vessel terminal debris bed (TDB) would likely be quenched by any remaining moderator, and some of the decay heat would be conducted through the calandria vessel shell to the surrounding reactor vault or shield tank water. As the moderator boiled off, the solid debris bed would transform into a more homogeneous molten corium pool located between top and bottom crusts. Until recently, the severe accident code MAAP-CANDU assumed that unreleased volatile and semi-volatile fission products remained in the TDB until after calandria vessel failure, due to low diffusivity through the top crust and the lack of gases or steam to flush released fission products from the debris. However, national and international experimental results indicate this assumption is unlikely; instead, high- and medium-volatility fission products would be released from a molten debris pool, and their volatility and transport should be taken into account in TDB modelling. The resulting change in the distribution of fission products within the reactor and containment, and the associated decay heat, can have significant effects upon the progression of the accident and fission-product releases to the environment. This article describes a postulated PHWR severe accident progression to generate a TDB and the effects of fission-product releases from the terminal debris, using the simple release model in the MAAP-CANDU severe accident code. It also provides insights from various experimental programs related to fission-product releases from core debris, and their applicability to the MAAP-CANDU TDB model. (author)

  4. Conceptual design of a quasi-homogeneous pressurized heavy water reactor to be operated in the closed Th-U233 fuel cycle

    International Nuclear Information System (INIS)

    1979-06-01

    This paper deals with the heavy water reactor, which, from the neutron economy point of view, offers advantages over the light water reactor. Its capability to be fuelled with natural uranium has also been considered a desirable nuclear option by various countries with sufficient domestic uranium resources not wishing to be dependent on the import of enrichment and other fuel cycle services which, in addition, would draw on the foreign exchange reserves. Pressurized heavy water reactors have been designed and built according to two somewhat different versions. While the Canadian CANDU-PHWR concept uses pressure tubes in a nearly unpressurized moderator tank (calandria), the German development line takes advantage of the established and well proven LWR technology, and, thus, uses a pressure vessel design where coolant channels and the surrounding moderator are held at equal pressure. This pressure vessel type heavy water reactor which has been built on a commercial demonstration plant level at ATUCHA in Argentina is described in a companion paper where also a conceptual design for a 685 MWsub(e) PHWR is discussed

  5. Comparative analysis of station blackout accident progression in typical PWR, BWR, and PHWR

    International Nuclear Information System (INIS)

    Park, Soo Young; Ahn, Kwang Il

    2012-01-01

    Since the crisis at the Fukushima plants, severe accident progression during a station blackout accident in nuclear power plants is recognized as a very important area for accident management and emergency planning. The purpose of this study is to investigate the comparative characteristics of anticipated severe accident progression among the three typical types of nuclear reactors. A station blackout scenario, where all off-site power is lost and the diesel generators fail, is simulated as an initiating event of a severe accident sequence. In this study a comparative analysis was performed for typical pressurized water reactor (PWR), boiling water reactor (BWR), and pressurized heavy water reactor (PHWR). The study includes the summarization of design differences that would impact severe accident progressions, thermal hydraulic/severe accident phenomenological analysis during a station blackout initiated-severe accident; and an investigation of the core damage process, both within the reactor vessel before it fails and in the containment afterwards, and the resultant impact on the containment.

  6. Acoustic emission experiments for PHWR technology development

    International Nuclear Information System (INIS)

    Pellionisz, P.; Jha, S.K.; Goswami, G.L.

    1992-06-01

    An Indian-Hungarian joint research project has been started with the aim of applying acoustic emission testing to solve specific problems of nuclear power plants. Acoustic emission measurement and analyzing instrumentation and software have been provided by the Hungarian side, while the measurements have been performed at the Bhabha Atomic Research Centre (BARC), India. The first task of the project was to check the capability of the method for leakage detection and shuttle movement monitoring of Pressurized Heavy Water Reactors (PHWR), and for monitoring manufacturing processes as laser welding. The preliminary measurements and results are presented. (R.P.) 15 refs.; 11 figs.; 3 tabs

  7. Detection of SBLOCA in the reactor of PHT system of Indian PHWR using GLR method

    Energy Technology Data Exchange (ETDEWEB)

    Chakrabarti, Dipankar [Indian Institute of Technology, Kanpur (India). Nuclear Engineering and Technology Programme

    1990-01-01

    Detection of Small Break Loss of Coolant Accident (SBLOCA) in nuclear power plants is important from the point of view of safety. Generalised Likelihood Ratio (GLR) test is one of the ways to detect faults like leak, controller bias etc. It can differentiate and diagnose different types of faults. A simplified state-space variable model of a PHWR reactor is developed and the utility of GLR method is investigated to detect leaks in the coolant channel in the reactor portion of the primary heat transport (PHT) system. A simple digital control system to control the outlet pressure of the reactor by manipulating the flow rate through the reactor is also developed. The results indicate that a leak of magnitude as low as 0.25% of the total flow rate through one coolant channel can be detected efficiently and promptly by this method. For instance a leak was detected within 3 minutes properly for 97 times out of 100 leaks simulated. (M.G.B.). 20 refs., 1 appendix.

  8. Quick and reliable estimation of power distribution in a PHWR by ANN

    International Nuclear Information System (INIS)

    Dubey, B.P.; Jagannathan, V.; Kataria, S.K.

    1998-01-01

    Knowledge of the distribution of power in all the channels of a Pressurised Heavy Water Reactor (PHWR) as a result of a perturbation caused by one or more of the regulating devices is very important from the operation and maintenance point of view of the reactor. Theoretical design codes available for this purpose take several minutes to calculate the channel power distribution on modern PCs. Artificial Neural networks (ANNs) have been employed in predicting channel power distribution of Indian PHWRs for any given configuration of regulating devices of the reactor. ANNs produce the result much faster and with good accuracy. This paper describes the methodology of ANN, its reliability, the validation range, and scope for its possible on-line use in the actual reactor

  9. An integrated approach for safer, productive and reliable PHWR fuel manufacturing at NFC

    International Nuclear Information System (INIS)

    Saibaba, N.

    2013-01-01

    India has been pursuing three-stage nuclear power programme and has developed comprehensive capabilities in all aspects of nuclear power and fuel cycle and is now recognized as a country with advanced nuclear technologies in the comity of nations. The first stage of Pressurized Heavy Water Reactors (PHWRs) based on natural uranium has reached a state of maturity. In view of civilian nuclear safeguards agreement with NSG and IAEA, Nuclear Power Reactors in India and associated fuel manufacturing facilities at Nuclear Fuel Complex (NFC) are grouped into IAEA safeguarded and out-of-safeguarded facilities. The civilian nuclear energy generation has to be accelerated for achieving energy security for the country. NFC has pioneered manufacturing technologies of UO 2 fuel, fuel clad and structural components for the PHWRs 220, 540 and PHWR700. Nearly 20 GWe of nuclear energy generation is being planned through PHWR route. Several technological improvements that were carried out recently in the production lines are the key to achieve higher productivity and safety. NFC has also been pursuing capacity augmentation by adding newer equipment in the existing facility and setting up new plants both for uranium production as well as zirconium production. Flexible manufacturing systems consisting of automatic workstations and robots were introduced in the 19 and 37 element PHWR fuel assembly lines. Various safety measures were introduced right from design stage for improving radiological safety for workmen. State-of-art equipment were designed, developed and commissioned for reduction/elimination of fatigue-oriented operations. In addition to natural uranium oxide fuel, NFC has also successfully manufactured virgin slightly enriched uranium (SEU) fuel and reprocessed depleted uranium fuels which were irradiated in the operating PHWRs. The paper brings out NFC's role in Indian nuclear power program and its manufacturing capabilities for types of PHWR fuel, zircaloy structural

  10. Role of pressuriser in enhancing pressure control system capability in primary system of 500 MWe PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Walia, M P.S.; Misri, Vijay; Bapat, C N; Sharma, V K [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    The primary heat transport system of a pressurized heavy water reactor (PHWR) extracts and transports the heat produced in the fuel (located inside coolant channel assemblies) to the steam generators where steam is generated to run the turbo-generator. The heat transport medium (primary coolant) is heavy water which is kept in a pressurized liquid state with the help of a pressure control system. Feed and bleed circuits with associated equipment of PHT main system have traditionally constituted the pressure control system. However, for large size reactors of 500 MWe capacity, a surge tank known as pressurizer was incorporated due to the presence of relatively large inventory in PHT main circuit. The pressurizer acts as a cushion for pressure variations resulting from various transients. This significantly reduces the onerous demand on feed and bleed system, thereby reducing reactor outages on system pressure excursions. The paper describes in detail the pressure control system of 500 MWe PHWR involving pressuriser and feed and bleed system including their functions and instrumentation. The results of mathematical modelling/analysis undertaken to establish the response adequacy of pressure control system, to postulated plant transients vis-a-vis the role of pressurizer are presented. (author). 10 figs.

  11. Reactivity requirements and safety systems for heavy water reactors

    International Nuclear Information System (INIS)

    Kati, S.L.; Rustagi, R.S.

    1977-01-01

    The natural uranium fuelled pressurised heavy water reactors are currently being installed in India. In the design of nuclear reactors, adequate attention has to be given to the safety systems. In recent years, several design modifications having bearing on safety, in the reactor processes, protective and containment systems have been made. These have resulted either from new trends in safety and reliability standards or as a result of feed-back from operating reactors of this type. The significant areas of modifications that have been introduced in the design of Indian PHWR's are: sophisticated theoretical modelling of reactor accidents, reactivity control, two independent fast acting systems, full double containment and improved post-accident depressurisation and building clean-up. This paper brings out the evolution of design of safety systems for heavy water reactors. A short review of safety systems which have been used in different heavy water reactors, of varying sizes, has been made. In particular, the safety systems selected for the latest 235 MWe twin reactor unit station in Narora, in Northern India, have been discussed in detail. Research and Development efforts made in this connection are discussed. The experience of design and operation of the systems in Rajasthan and Kalpakkam reactors has also been outlined

  12. Development of PHWR fuel fabrication in Korea

    International Nuclear Information System (INIS)

    Suh, K.S.; Yang, M.S.; Kim, D.H.; Rim, C.S.

    1988-01-01

    Korea Advanced Energy Research Institute (KAERI) started a research project to develop the PHWR (CANDU) nuclear fuel fabrication technology in 1981. Based on the results of the intensive developmental work, several prototype fuel bundles were fabricated and tested in the Hot Test Loop at KAERI continuously in 1983 and 1984. After that, irradiation test and post-irradiation examination were carried out for two KAERI-made fuel bundles at Chalk River Nuclear Laboratories in Canada in 1984. Since the results of in-pile and out-of-pile tests with prototype fuel bundles proved to be satisfactory, 48 additional fuel bundles were loaded in Wolsung reactor (CANDU) in 1984 and 1985, and all of them were discharged without a defect after excellent performance in the power reactor. In 1985, the Korean government decided that KAERI supplies all the fuel necessary for the Wolsung reactor. For the mass production of nuclear fuel bundle, several process equipment, facilities and automation methods have been improved making use of experience accumulated during research. A quality assurance program was also established, and quality inspection technology was reviewed and improved to fit the mass production. This paper deals with the development experience so far obtained with the design and fabrication of the Korean PHWR fuel

  13. Safety margin improvement by adopting the feature of interleaving in 700 MWe PHWR

    International Nuclear Information System (INIS)

    Kumar, Nrependra; Yadav, S.K.; Khan, T.A.; Dixit, A.; Singhal, Mukesh; Nair, Suma R.

    2015-01-01

    Indian Pressurised Heavy Water Reactors (IPHWRs) of 700 MWe are under construction at Kakrapar Atomic Power Project -3,4 and Rajasthan Atomic Power Project-7,8. These units have enhanced safety features with respect to standard IPHWRs. One of the enhanced features is interleaving of feeders/channels. In interleaved feeder configuration, each header located at either end of reactor gets connected to one quarter of core channels, which are uniformly distributed. The core is divided into two loops with feeder connected in interleaved fashioned. In this paper a comparative study has been performed between the two cases: 1) The core splits in two vertical halves and each vertical half is a loop of PHT (TAPS-3 and 4 Type configuration). 2) The core is divided into two loops with feeders/ channels connected in interleaved fashioned (700 MWe Configuration). LOCA studies have been performed for 700 MWe PHWR considering interleaving of feeders configuration using in-house developed computer code ATMIKA and 3-D neutron kinetics code IQS-3D. The issue of interleaving is closely linked to an inherent reactivity characteristic of PHWR reactors (viz., positive void reactivity coefficient) which leads to a power increase following a Large LOCA. In 700 MWe PHWR with intent to improve the safety margin, adopted the feature of interleaving of feeders which causes in reduction in the magnitude of void coefficient and results in reduction of peak power during LBLOCA. The systematic LBLOCA study demonstrates that interleaved configuration of feeder/channels of two loops has higher safety margins (i.e. with respect to peak power, prompt-criticality margin, adiabatic heat deposition on the fuel pins, sheath temperature excursion and clad oxidation) with regard to the effectiveness of shutdown system. (author)

  14. Non-destructive evaluation of stream generator tubes and pressure tubes from the PHWR reactors, using the rotating magnetic field method

    International Nuclear Information System (INIS)

    Premel, D.; Placko, D.; Grimberg, R.; Savin, A.

    2001-01-01

    This work presents a new type of eddy current transducer with a rotating magnetic field devoted to the inspection of steam generator tubes and pressure tubes from the PHWR reactors. A theoretical model has been developed that permits the calculations of the emf induced in the reception coils in the presence of the copper or magnetite deposits, anti-vibration railing and garter springs. (authors)

  15. Use of gadolinium as neutron poison in 540 MWe PHWR

    International Nuclear Information System (INIS)

    Nag, P.K.; Fernando, M.P.S.; Kumar, A.N.

    2006-01-01

    In Pressurised heavy water reactors (PHWRs), neutron poison in the moderator is used to compensate the excess reactivity present in the core on different occasions such as xenon decay during synchronization just after poison out period or start ups from xenon free conditions. It is also used in secondary shutdown system (SDS-2), where required amount of neutron poison is injected directly into the moderator within 2.5 seconds. Further, it is also used for over poisoning the moderator to achieve the guaranteed shutdown state when the regular shutdown systems are taken for maintenance. Generally, two types of moderator poisons are used in power reactors to balance the reactivity of the core and they are boron and gadolinium. Gadolinium is used in the form of gadolinium nitrate (Gd(NO 3 ) 3 .6H 2 O). The paper gives the details of estimation of reactivity coefficients of gadolinium for 540 MWe PHWR for different operating conditions. These neutron poisons are converted into non-absorbing elements and therefore their effective worth will decrease as reactor operation proceeds. The rate of burning of neutron absorbing isotopes depends on its magnitude of absorption cross-section and thermal flux seen by them. The present study discusses the burning characteristics of gadolinium during power operation in 540 MWe PHWR. It is established by detailed analysis that the rate of positive reactivity realized due to burning of neutron absorbing Gd isotopes almost match with the build up rate of xenon. The burning half lives of boron and gadolinium is worked out for different power levels. (author)

  16. Dynamic behaviour of a typical PHWR under earthquake load conditions

    International Nuclear Information System (INIS)

    Fischer, U.; Brandt, K.; Krutzik, N.J.

    1984-01-01

    The paper deals with dynamic calculations for a PHWR reactor building founded on rock and on a base isolation system. The zero period accelerations, displacements, mode shapes and the floor response spectra of both calculations are compared. (Author) [pt

  17. MCCI study for Pressurized Heavy Water Reactor under hypothetical accident condition

    International Nuclear Information System (INIS)

    Verma, Vishnu; Mukhopadhyay, Deb; Chatterjee, B.; Singh, R.K.; Vaze, K.K.

    2011-01-01

    In case of severe core damage accident in Pressurized Heavy Water Reactor (PHWR), large amount of molten corium is expected to come out into the calandria vault due to failure of calandria vessel. Molten corium at high temperature is sufficient to decompose and ablate concrete. Such attack could fail CV by basement penetration. Since containment is ultimate barrier for activity release. The Molten Core Concrete Interaction (MCCI) of the resulting pool of debris with the concrete has been identified as an important part of the accident sequence. MCCI Analysis has been carried out for PHWR for a hypothetical accident condition where total core material is considered to be relocated in calandria vault. Concrete ablation rate in vertical and radial direction is evaluated for rectangular geometry using MEDICIS module of ASTEC Code. Amount of gases released during MCCI is also evaluated. (author)

  18. Accident sequences evaluation using SFATs for low power and shutdown operation of pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Kim, Chansoo; Chung, Chang-Hyun; Yang, Huichang

    2004-01-01

    To maintain the level of defense-in-depth safety of Pressurized Heavy Water Reactor (PHWR) during LP/SD operation, the qualitative risk evaluation methods such as Safety Function Assessment Trees (SFATs) are required. Therefore SFATs are suggested to assess and manage the PHWR safety in LP/SD. Before this study, safety functions of PHWR were classified into 7 groups; Reactivity Control, Core Cooling, Secondary Heat Removal, Primary Heat Transport Inventory, Essential Electrical Power, Cooling Water, and Containment Integrity. The SFATs for PHWR LP/SD operations were developed along with the Plant Outage Status (POS) variation, and totally 38 SFATs were developed for Wolsung Unit 2. For the verification of SFATs logics developed, top 5 accident sequences those contribute the CDF of PHWR were selected, and plant safety status were evaluated for those accident sequences. Accident sequences such as DCC-4 (Dual Control Computer Failure), CL4-16 (Total Loss of Class IV Power), and FWPV-11 (Loss of Feedwater Supply to SG due to Failure of Pumps/Values) were included. In this research the evaluation of plant safety status by accident sequences using SFATs and the verification of the SFATs were performed. Through the verification of SFAT logics, the enhancements to the internal logics of the SFATs were made, and the dependencies between safety systems and support systems were considered. It is expected the defense-in-depth evaluation model of PHW just as SFATs can be utilized in the configuration risk management program (CRMP) development and improve technical specifications development for Korean PHWRs. (author)

  19. Design of an additional heat sink based on natural circulation in pressurized water reactors

    International Nuclear Information System (INIS)

    Frischengruber, Kurt; Solanilla, Roberto; Fernandez, Ricardo; Blumenkrantz, Arnaldo; Castano, Jorge

    1989-01-01

    Residual heat removal through the steam generators in Nuclear Power Plant with pressurized water reactors (PWR) or pressurized heavy water reactors (PHWR in pressured vessel or pressured tube types) requires the maintenance of the steam generator inventory and the availability of and appropriate heat sink, which are based on the operability of the steam generators feedwater system. This paper describes the conceptual design of an assured heat removal system which includes only passive elements and is based on natural circulation. The system can supplement the original systems of the plant. The new system includes a condenser/boiler heat exchanger to condense the steam produced in the steam generator, transferring the heat to the water of an open pool at atmospheric pressure. The condensed steam flows back to the steam generators by natural circulation effects. The performance of an Atucha type PHWR nuclear power station with and without the proposed system is calculated in an emergency power case for the first 5000 seconds after the incident. The analysis shows that the proposed system offers the possibility to cool-down the plant to a low energy state during several hours and avoids the repeated actuation of the primary and secondary system safety valves. (Author) [es

  20. Blind prediction exercise on modeling of PHWR fuel at extended burnup

    International Nuclear Information System (INIS)

    Sah, D.N.; Viswanathan, U.K.; Viswanadham, C.S.; Unnikrishnan, K.; Rath, B.N.

    2008-01-01

    A blind prediction exercise was organised on Indian Pressurised Heavy Water Reactor (PHWR) fuel to investigate the predictive capability of existing codes for their application at extended burnup and to identify areas of improvement. The blind problem for this exercise was based on a PHWR fuel bundle irradiated in Kakrapar Atomic Power Station-I (KAPS-I) up to about 15 000 MWd/tU and subjected to detailed post-irradiation examination (PIE) in the hot cells facility at BARC. Eleven computer codes from seven countries participated in this exercise. The participants provided blind predictions of fuel temperature, fission gas release, internal gas pressure and other performance parameters for the fuel pins. The predictions were compared with the experimental PIE data which included fuel temperature derived from fuel restructuring, fission gas release measured by fuel pin puncturing, internal gas pressure in pin, cladding oxidation and fuel microstructural data. The details of the blind problem and an analysis of the results of blind predictions by the codes vis-a-vis measured data are provided in this paper

  1. In-calandria retention of corium in Indian PHWR - experimental simulations with decay heat

    International Nuclear Information System (INIS)

    Nayak, A.K.

    2015-01-01

    The severe accident at Fukushima has compelled the nuclear community to relook at the safety of existing nuclear power plants (NPP) against natural origin events of beyond design basis and prolonged station black out (SBO). A major lesson learned is to assess the capability of the safety systems to cool the reactor core and spent fuel storage facilities in the event of a prolonged station black out (SBO). Similar safety review is planned for the Indian Pressurized Heavy Water Reactors (PHWRs) considering a prolonged SBO. The Indian PHWR is a heavy water-moderated and cooled, natural uranium-fuelled reactor in which the horizontal fuel channels are submerged in a pool of heavy water moderator located inside the calandria vessel. The calandria vessel is surrounded by a calandria vault having large volume of light water. Concerns are raised that in the event of an unmitigated SBO, it may result into a low probable severe accident leading to core melt down. The core melt may further fail the calandria vessel in case the melt is not quenched. If the calandria vessel fails, the corium shall interact with the cold calandria vault water and concrete resulting in generation of large amount of non-condensable gases and steam which will lead to over pressurization of containment and may cause its failure. Therefore, in-calandria corium retention via external cooling using vault water can be considered as an important accident management program in PHWR. In this strategy, the core melt retains inside the calandria vessel by continually removing the stored heat and decay heat through outer surface of the vessel by cooling water and maintaining the integrity of the vessel. The present study focuses on experimental investigation in a scaled facility of an Indian PHWR to investigate the coolability of molten corium with simulated decay heat by using the calandria vault water. Molten borosilicate glass was used as the simulant due to its comparable heat transfer characteristics

  2. MTR and PWR/PHWR in-pile loop safety in integration with the operation of multipurpose reactor - GAS

    International Nuclear Information System (INIS)

    Suharno; Aji, Bintoro; Sugiyanto; Rohman, Budi; Zarkasi, Amin S.; Giarno

    1998-01-01

    MTR and PWR/PHWR In-Pile Loop safety analysis in integration with the operation of Multipurpose Reactor - Gas has been carried out and completed. The assessment is emphasized on the function of the interface systems from the dependence of the operation and the evaluation to the possibility of leakage or failure of the in-pile part inside the reactor pool and reactor core. The analysis is refers to the logic function of the interface system and the possibility of leakage or failure of the in-pile part inside reactor pool and reactor core to consider the integrity of the core qualitatively. The results show that in normal and in transient conditions , the interface system meet the function requirement in safe integrated operation of in-pile loop and reactor. And the results of the possibility analysis of the leakage shows that the possibility based on mechanically assessment is very low and the impact to core integrity is nothing or can be eliminated. The possible position for leakage is on the flen on which one meter above the top level of the core, therefore no influence of leakage to the core

  3. Evaluation of a dilute chemical decontaminant for pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Velmurugan, S.; Narasimhan, S.V.; Mathur, P.K.; Venkateswarlu, K.S.

    1991-01-01

    In this paper a dilute chemical decontamination formulation based on ethylene diamine tetraacetic acid, oxalic acid, and citric acid is evaluated for its efficacy in removing oxide layers in a pressurized heavy water reactor (PHWR). An ion exchange system that is specifically suited for fission product-dominated contamination in a PHWR is suggested for the reagent regeneration stage of the decontamination process. An attempt has been made to understand the redeposition behavior of various isotopes during the decontamination process. The polarographic method of identifying the species formed in the dissolution process is explained. Electrochemical measurements are employed to follow the course of oxide removal during the dissolution process. Scanning electron micrographs of metal coupons before and after the dissolution process exemplify the involvement of base metal in the formation of a ferrous oxalate layer. Material compatibility tests between the decontaminant and carbon steel, Monel-400, and Zircaloy-2 are reported

  4. Conceptual design of a large heavy water reactor for US siting

    International Nuclear Information System (INIS)

    Shapiro, N.L.; Jesick, J.F.; Molin, A.T.; Daniel, J.A.

    1979-09-01

    Information on the PHWR type reactor is presented concerning design characteristics; fuel management and resource utilization; economic evaluations; safety, licensing, and environmental impact; and commercial introduction

  5. Neutron radiography for quality assurance of PHWR fuel pins

    International Nuclear Information System (INIS)

    Chandrasekharan, K.N.; Patil, B.P.; Ghosh, J.K.; Ganguly, C.

    1993-01-01

    Neutron radiography was employed for quality assurance (QA) for advanced PHWR experimental fuel pins containing mixed uranium-plutonium dioxide and thorium-plutonium dioxide pellets. Direct, transfer and track-etch techniques were utilised. The thermal neutron beam facility of APSARA research reactor at Bhabha Atomic Research Centre was used. (author). 5 refs., 16 figs., 2 tabs

  6. Application of Genetic Algorithm methodologies in fuel bundle burnup optimization of Pressurized Heavy Water Reactor

    International Nuclear Information System (INIS)

    Jayalal, M.L.; Ramachandran, Suja; Rathakrishnan, S.; Satya Murty, S.A.V.; Sai Baba, M.

    2015-01-01

    Highlights: • We study and compare Genetic Algorithms (GA) in the fuel bundle burnup optimization of an Indian Pressurized Heavy Water Reactor (PHWR) of 220 MWe. • Two Genetic Algorithm methodologies namely, Penalty Functions based GA and Multi Objective GA are considered. • For the selected problem, Multi Objective GA performs better than Penalty Functions based GA. • In the present study, Multi Objective GA outperforms Penalty Functions based GA in convergence speed and better diversity in solutions. - Abstract: The work carried out as a part of application and comparison of GA techniques in nuclear reactor environment is presented in the study. The nuclear fuel management optimization problem selected for the study aims at arriving appropriate reference discharge burnup values for the two burnup zones of 220 MWe Pressurized Heavy Water Reactor (PHWR) core. Two Genetic Algorithm methodologies namely, Penalty Functions based GA and Multi Objective GA are applied in this study. The study reveals, for the selected problem of PHWR fuel bundle burnup optimization, Multi Objective GA is more suitable than Penalty Functions based GA in the two aspects considered: by way of producing diverse feasible solutions and the convergence speed being better, i.e. it is capable of generating more number of feasible solutions, from earlier generations. It is observed that for the selected problem, the Multi Objective GA is 25.0% faster than Penalty Functions based GA with respect to CPU time, for generating 80% of the population with feasible solutions. When average computational time of fixed generations are considered, Penalty Functions based GA is 44.5% faster than Multi Objective GA. In the overall performance, the convergence speed of Multi Objective GA surpasses the computational time advantage of Penalty Functions based GA. The ability of Multi Objective GA in producing more diverse feasible solutions is a desired feature of the problem selected, that helps the

  7. Improvement in fuel utilization in pressurized heavy water reactors due to increased heavy water purity

    International Nuclear Information System (INIS)

    Balakrishnan, M.R.

    1991-01-01

    This paper reports that in a pressurized heavy water reactor (PHWR), the reactivity of the reactor and, consequently, the discharge burnup of the fuel depend on the isotopic purity of the heavy water used in the reactor. The optimal purity of heavy water used in PHWRs, in turn, depends on the cost of fabricated uranium fuel and on the incremental cost incurred in improving the heavy water purity. The physics and economics aspects of the desirability of increasing the heavy water purity in PHWRs in India were first examined in 1978. With the cost data available at that time, it was found that improving the heavy water purity from 99.80% to 99.95% was economically attractive. The same problem is reinvestigated with current cost data. Even now, there is sufficient incentive to improve the isotopic purity of heavy water used in PHWRs. Admittedly, the economic advantage that can be derived depends on the cost of the fabricated fuel. Nevertheless, irrespective of the economics, there is also a fairly substantial saving in natural uranium. That the increase in the heavy water purity is to be maintained only in the low-pressure moderator system, and not in the high-pressure coolant system, makes the option of achieving higher fuel burnup with higher heavy water purity feasible

  8. Computation and measurement of calandria tube sag in PHWR

    International Nuclear Information System (INIS)

    Kim, Tae Ryong; Sohn, Seok Man

    2003-01-01

    Calandria tubes and liquid injection shutdown system (LISS) tubes in a pressurized heavy water reactor (PHWR) is known to sag due to irradiation creep and growth during plant operation. When the sag of calandria tube becomes bigger, the calandria tube possibly comes in contact with LISS tube crossing beneath and calandria tube. The contact subsequently may cause the damage on the calandria tube resulting in unpredicted outage of the plant. It is therefore necessary to check the gap between the two tubes in order to periodically confirm no contact by using a proper measure during the plant life. An ultrasonic gap measuring probe assembly which can be inserted into two viewing ports of the calandria was developed in Korea and utilized to measure the sags of both tubes in the PHWR. It was found that the centerlines of calandria tubes and liquid injection shutdown system tubes can be precisely detected by ultrasonic wave. The gaps between two tubes were easily obtained from the relative distance of the measured centerline elevations of the tubes. Based on the irradiation creep equation and the measurement data, a computer program to calculate the sags was also developed. With the computer program, the sag at the end of plant life was predicted. (author)

  9. Material and fabrication considerations for the CANDU-PHWR heat transport system

    International Nuclear Information System (INIS)

    Filipovic, A.; Price, E.G.; Barber, D.; Nickerson, J.

    1987-03-01

    CANDU PHWR nuclear systems have used carbon steel material for over 25 years. The accumulated operating experience of over 200 reactor years has proven this unique AECL approach to be both technically and economically attractive. This paper discusses design, material and fabrication considerations for out-reactor heat transport system major components. The contribution of this unique choice of materials and equipment to the outstanding CANDU performance is briefly covered

  10. Acoustic emission technique for leak detection in an end shield of a pressurized heavy water reactor

    International Nuclear Information System (INIS)

    Kalyanasundaram, P.; Jayakumar, T.; Raj, B.

    1989-01-01

    This paper discusses the successful application of the Acoustic Emission Technique (AET) for detection and location of leak paths present on the inaccessible side of an end shield of a Pressurized Heavy Water Reactor (PHWR). The methodology was based on the fact that air and water leak AE signals have different characteristic features. Baseline data was generated from a sound end-shield of a PHWR for characterizing the background noise. A mock up end-shield system with saw cut leak paths was used to verify the validity of the methodology. It was found that air leak signals under pressurisation (as low as 3 psi) could be detected by frequency domain analysis. Signals due to air leaks from various locations of a defective end-shield were acquired and analysed. It was possible to detect and locate leak paths. Presence of detected leak paths were further confirmed by alternate test. (orig.)

  11. Recent IAEA activities on CANDU-PHWR fuels and fuel cycles

    International Nuclear Information System (INIS)

    Inozemtsev, V.; Ganguly, C.

    2005-01-01

    Pressurized Heavy Water Reactors (PHWR), widely known as CANDU, are in operation in Argentina, Canada, China, India, Pakistan, Republic of Korea and Romania and account for about 6% of the world's nuclear electricity production. The CANDU reactor and its fuel have several unique features, like horizontal calandria and coolant tubes, on-power fuel loading, thin-walled collapsible clad coated with graphite on the inner surface, very high density (>96%TD) natural uranium oxide fuel and amenability to slightly enriched uranium oxide, mixed uranium plutonium oxide (MOX), mixed thorium plutonium oxide, mixed thorium uranium (U-233) oxide and inert matrix fuels. Several Technical Working Groups (TWG) of IAEA periodically discuss and review CANDU reactors, its fuel and fuel cycle options. These include TWGs on water-cooled nuclear power reactor Fuel Performance and Technology (TWGFPT), on Nuclear Fuel Cycle Options and spent fuel management (TWGNFCO) and on Heavy Water Reactors (TWGHWR). In addition, IAEA-INPRO project also covers Advanced CANDU Reactors (ACR) and DUPIC fuel cycles. The present paper summarises the Agency's activities in CANDU fuel and fuel cycle, highlighting the progress during the last two years. In the past we saw HWR and LWR technologies and fuel cycles separate, but nowadays their interaction is obviously growing, and their mutual influence may have a synergetic character if we look at the world nuclear fuel cycle as at an integrated system where the both are important elements in line with fast neutron, gas cooled and other advanced reactors. As an international organization the IAEA considers this challenge and makes concrete steps to tackle it for the benefit of all Member States. (author)

  12. Self reliance in equipment building for PHWR fuel fabrication

    International Nuclear Information System (INIS)

    Sastry, V.S.; Hemantha Rao, G.V.S.; Jayaraj, R.N.

    2009-01-01

    Full text: Keeping in tune with the policy of self-reliance and indigenisation adopted from the very inception of nuclear power programme in India during the mid 1960, Nuclear Fuel Complex, established in the year 1971, developed its own processes, equipment and technologies based on both in-house experience and the expertise available in the indigenous industry. Starting from the basic raw materials, Nuclear Fuel Complex (NFC) manufactures and supplies finished fuel assemblies, apart from zircaloy core components, to all the nuclear power stations in India. Out of several products manufactured by NFC, 19 and 37 element fuel bundles for Pressurised Heavy Water Reactors (PHWRs) is vital for operation of several PHWRs being operated by Nuclear Power Corporation of India Limited (NPCIL). Starting from the manufacturing of half-charge for RAPS-1, more than 3.8 lakh fuel bundles were made till now. Several process improvements were taken up over the years for improving the quality of the fuel. PHWR fuel bundles manufactured by NFC has adopted an unique feature of joining appendages on zirconium alloy tubes by resistance welding before loading natural uranium dioxide pellets. Graphite coating on the inner surface of the zirconium alloy tube and vacuum baking, use of profiled end caps, use of bio-degradable cleaning agents are some of the processes adopted in the manufacturing of PHWR fuel bundles. With the recent opening up of international nuclear trade for India and the enhanced growth of nuclear power, exciting opportunities and challenges confront NFC. This paper presents salient features of some important special purpose equipment developed in-house at NFC for production of PHWR fuel bundles. It looks ahead to develop many more such special purpose equipment towards meeting the diverse demands now showing up to meet the indigenous as well as international requirements

  13. An infrared technique for on-line detection of orientation of PHWR fuel pellets

    Energy Technology Data Exchange (ETDEWEB)

    Behere, P G [Bhabha Atomic Research Centre, Tarapur (India). Advanced Fuel Fabrication Facility

    1994-12-31

    The PHWR (Pressurised Heavy Water Reactor) fuel pellets fabricated in a fuel fabrication plant are cylindrical in shape and after sintering acquire a nominal size of 14.3 mm diameter and 17 mm height. These pellets have dish at one end while the other end is flat. The dish is provided to accommodate fission gases and thermal expansion. The sintered pellets are examined for physical damages such as cracks, chippings etc. and these should have one particular orientation while loading. A technique is suggested to solve the problems arising during the fuel pellet loadings. 3 figs.

  14. An infrared technique for on-line detection of orientation of PHWR fuel pellets

    International Nuclear Information System (INIS)

    Behere, P.G.

    1994-01-01

    The PHWR (Pressurised Heavy Water Reactor) fuel pellets fabricated in a fuel fabrication plant are cylindrical in shape and after sintering acquire a nominal size of 14.3 mm diameter and 17 mm height. These pellets have dish at one end while the other end is flat. The dish is provided to accommodate fission gases and thermal expansion. The sintered pellets are examined for physical damages such as cracks, chippings etc. and these should have one particular orientation while loading. A technique is suggested to solve the problems arising during the fuel pellet loadings. 3 figs

  15. Process improvements for enhanced productivity of PHWR garter springs

    International Nuclear Information System (INIS)

    Srinivasula Reddy, S.; Tonpe, Sunil; Saibaba, N.; Jayaraj, R.N.

    2009-01-01

    Full text: In Pressurised Heavy Water Reactors (PHWR), Garter springs are used as spacers between the coolant tube and calandria tube. Garter springs are made from Zirconium alloy containing 2.5 % Niobium and 0.5% copper. The springs are basically manufactured by coiling a wire of cross section 1.7 mm x 1.0 mm, which is produced by series of drawing and swaging operations using hot extruded rods of 19 mm diameter. The manufacturing process also involves heat treatment and chemical cleaning operations at appropriate stages. It is required to ensure that the life of springs against parameters like hydrogen pickup, residual stresses and low stiffness is improved at the manufacturing stage itself by improving manufacturing process. The impact of above problems on spring life and process improvements is briefly discussed. The critical factor affecting the garter spring performance in PHWR Reactor is mainly hydrogen. The life limiting factors for garter springs are the problems arising out of high total hydrogen content, which depends on the hydrogen pickup during reactor operation. This phenomenon can happen during the reactor operation, as springs are prone to pick-up hydrogen in the reactor environment. Hence acceptable hydrogen content for the springs is specified as 25 ppm (max.). Garter spring is susceptible to hydrogen pick-up during various production processes, which make material brittle and difficult for fabrication process such as wire drawing and coiling. By studying and optimizing the process parameters of spring manufacturing, the hydrogen pick-up of springs is brought down from 70 ppm to a level of 20 ppm. Garter springs are provided with a hook at each end to enable its assembly to coolant tube in the reactor. The hook portion is very critical in maintaining the integrity of the spring. It is desirable to have the hook portion relieved of all residual stresses. For this purpose manufacturing process has been modified and solutionising was introduced as

  16. Flux mapping algorithm (FMA) for 700 MWe PHWR

    International Nuclear Information System (INIS)

    Sonavani, Manoj; Ingle, V.J.; Singhvi, P.K.; Raj, Manish; Fernando, M.P.S.; Kumar, A.N.

    2012-01-01

    For large reactor like 700 MWe PHWR effective spatial control is essential and is provided by RRS. For spatial control purpose reactor core is divided into 14 power zones. Corresponding to each zone is a light water zonal compartment. The 14 ZCCs are located in two radial planes, each containing 7 ZCCs. For each zone, power measurement is carried out using inconel (3 pitch long) self powered neutron detector (SPND) at appropriate location close to the respective ZCC. Since the zone power as obtained by the healthy zone control detector (ZCD) reading belonging to a particular zone may not correspond to its actual power because the detector per zone, measure only average fluxes but the zone extends over a large core region. Therefore accurate estimation of zone power calibration factors is required to estimate the zone powers and also to provide effective spatial power control to avoid the xenon induced spatial power oscillations in large PHWRs like 700 and 540 MWe Reactors. This accurate calculation of zone power is carried out by FMS which uses λ modes in its algorithm. Flux at any point inside the reactor can be represented in terms of the linear combination of these modes. Coefficients used in the expansion are called combining coefficient. If the readings of the detectors are known, then combining coefficients can be estimated by simple matrix operations. Once these combining coefficients are known, flux at any point inside the reactor can be found. (author)

  17. Aspects on thorium utilization in heavy water reactors

    International Nuclear Information System (INIS)

    1978-11-01

    Some of the main problems of the Th - PHWR cycles are analyzed. With respect to the burnup limitations introduced by SSET cycle conditions and the burnup sensitivities of this reference cycle, estimates are presented using an integrated neutron-heavy element balance method. A PHWR of 1 GW(e) very similar to the CANDU current design was selected. In the case of 0.5% uranium losses, 11000 MWD/tHE and 13000 MWD/tHE were considered for U-235, respectively, for the Pu initialization of the cycle, the corresponding inventory being 4 t U-235/GW(e) and 5 t Pu (with 72% fissile content) per GW(e) for one year delay time between reactor out to reactor in, 66% capacity factor, 27 MW (fission)/tHE medium specific power. The following aspects are also analyzed: Safety problems associated with low delayed neutron fraction values; High and intermediate burnup fuel elements conceptual problems; Specific problems of thorium reprocessing; Specific problems for radioactive wastes and thorium storage; U-232 content evaluations and related fuel fabrication problems

  18. Simulation of hot-channel transients for PHWR reactors

    International Nuclear Information System (INIS)

    Masriera, N.A.

    1988-01-01

    For the simulation of transients a whole-plant code is needed. These codes model the core in a very simplified way. When local variables have to be calculated a different kind of code is needed: a subchannel-code. This report studies the use of the cobra code as a subchannel-code, for the simulation of a PHWR fuel channel, considering that this code was developed for PWR cores calculation. A special effort is made to obtain optimized models for different calculations: steady state, soft transients and severe transients. These models differ in number of subchannels, axial nodes, and the choice of the most important variables. (Author) [es

  19. Dual pressurized light water reactor producing 2000 M We

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-10-15

    The dual unit optimizer 2000 M We (Duo2000) is proposed as a new design concept for large nuclear power plant. Duo is being designed to meet economic and safety challenges facing the 21 century green and sustainable energy industry. Duo2000 has two nuclear steam supply systems (NSSS) of the unit nuclear optimizer (Uno) pressurized water reactor (PWR) in a single containment so as to double the capacity of the plant. Uno is anchored to the optimized power reactor 1000 M We (OPR1000) of the Korea Hydro and Nuclear Power Co., Ltd. The concept of Duo can be extended to any number of PWRs or pressurized heavy water reactors (PHWR s), or even boiling water reactor (BWRs). Once proven in water reactors, the technology may even be expanded to gas cooled, liquid metal cooled, and molten salt cooled reactors. In particular, since it is required that the small and medium sized reactors (SMRs) be built as units, the concept of Duo2000 will apply to SMRs as well. With its in-vessel retention as severe accident management strategy, Duo can not only put the single most querulous PWR safety issue to end, but also pave ways to most promising large power capacity dispensing with huge redesigning cost for generation III + nuclear systems. The strengths of Duo2000 include reducing the cost of construction by decreasing the number of containment buildings from two to one, minimizing the cost of NSSS and control systems by sharing between the dual units, and lessening the maintenance cost by uniting NSSS. The technology can further be extended to coupling modular reactors as dual, triple, or quadruple units to increase their economics, thus accelerating the commercialization as well as the customization of SMRs. (Author)

  20. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  1. Design aspects of PHWR for improved performance

    International Nuclear Information System (INIS)

    Das, M.

    1989-01-01

    The PHWR fuel bundle is elegantly simple in design consisting of only six components. The unique features of the design include high density natural UO 2 pellets, collapsible zircaloy cladding, no gas plenums and short (50 cm), simple bundle configuration. Over the last 20 years, considerable efforts have been expended and still being continued on development of analytical tools and computer codes generation of technical specifications tests and experimental studies type tests on prototype bundles irradiation of special documented fuel bundles in power reactors and monitoring and analysis of fuel performance. The knowledge thus gained has helped us to modify design requirements, relax technical specifications and to evolve new, improved designs. The PHWR fuel technology in India can now be considered as well proven but there is considerable scope for further improvements both in design and manufacturing. For example, in design, use of thinner wall cladding (to improve burn up) bundle design with graded elements, double dished pellet, improved coatings, use of MOX fuel etc. are being explored. On the manufacturing side emphasis need to be given on maintaining the quality, improvement on production and process control. The use of automation and advances in machine control techniques, for example, using micro processors can effectively contribute to improvements in quality, productivity and lowering of fuel fabrication costs. In this paper, the PHWR fuel design features, different fuel designs evolved, fuel specifications, influence of fabrication variables and future direction in improved fuel performance are discussed. (author) 9 refs., 7 figs

  2. Qualification of PHT piping of Indian 500 MW PHWR for LBB, using R-6 method

    International Nuclear Information System (INIS)

    Rastogi, Rohit; Bhasin, V.; Kushwaha, H.S.

    1997-01-01

    This document discusses the qualification of straight pipe portion of the primary heat transport (PHT) piping of Indian 500 MWe pressurised heavy water reactor (PHWR) for leak before break (LBB). The evaluation is done using R-6 [1] method. The results presented here are: the safety margins which exist on straight pipe components of main PHT piping of 500 MWe, under leakage size crack (LSC) and design basis accident loads; the sensitivity of safety margins with respect to different analysis parameters and the qualification of PHT piping for LBB based on criterion given by NUREG-1061 [2] and TECDOC-774 [3]. (author)

  3. Development and Application of MCNP5 and KENO-VI Monte Carlo Models for the Atucha-2 PHWR Analysis

    Directory of Open Access Journals (Sweden)

    M. Pecchia

    2011-01-01

    Full Text Available The geometrical complexity and the peculiarities of Atucha-2 PHWR require the adoption of advanced Monte Carlo codes for performing realistic neutronic simulations. Core models of Atucha-2 PHWR were developed using both MCNP5 and KENO-VI codes. The developed models were applied for calculating reactor criticality states at beginning of life, reactor cell constants, and control rods volumes. The last two applications were relevant for performing successive three dimensional neutron kinetic analyses since it was necessary to correctly evaluate the effect of each oblique control rod in each cell discretizing the reactor. These corrective factors were then applied to the cell cross sections calculated by the two-dimensional deterministic lattice physics code HELIOS. These results were implemented in the RELAP-3D model to perform safety analyses for the licensing process.

  4. Upgradation of design features of primary coolant pumps of Indian 220 MWe PHWR

    International Nuclear Information System (INIS)

    Sharma, S.S.; Mhetre, S.G.; Manna, M.M.

    1994-01-01

    Evolution in the design features of Primary Coolant Pump (PCP) had started in fifties for catering to stringent specification requirements of reactor coolant systems of larger capacity reactors of various kinds. Primary coolant pumps of PWR and PHWR are employed for circulating radioactive, pressurized hot water in a circuit consisting of reactor (heat source) and steam generator (heat sink). As primary coolant pump capacity decides the station capacity, larger capacity primary coolant pumps have been evolved. Since primary coolant pump pressure containing parts are part of Primary Heat Transport system envelope, the parts are designed, manufactured, inspected and tested in accordance with the applicable system guidelines. Flywheel is mounted on the motor shaft for increasing mass moment of inertia of pump motor rotor to meet the coast down requirements of reactor cooling system under Class-IV electrical power supply failure. Due to limited accessibility of the PCP (PCP installed in shut down accessible area), quick maintenance, condition monitoring, reliable shaft seal system/bearing system aspects have been of great concern to reactor owners and pump manufacturers. In this paper upgradation of design features of RAPS, MAPS and NAPS primary coolant pumps have been covered. (author). 4 figs., 1 tab

  5. Neutron radiography of irradiated zircaloy coupons of pressure tubes from PHWR`s

    Energy Technology Data Exchange (ETDEWEB)

    Gangotra, S; Ouseph, P M; Tamhane, A B; Singh, H N; Sahoo, K C [Bhabha Atomic Research Centre, Bombay (India). Radiometallurgy Div.

    1994-12-31

    The Indian Pressurised Heavy Water Reactors (PHWR`s) are of CANDU type, consisting of 304 zircaloy-2 pressure tubes. These pressure tubes contain the fuel bundles, where the heat is generated and is removed by the heavy water flowing through these pressure tubes at high temperature and pressure. These pressure tubes are surrounded by the calandria tubes, and are separated from them by a pair of garter springs. Over a period of time, as a result of the irradiation creep and assisted by the displacement of the garter springs, the hot pressure tube may come in contact with the cold calandria tube. This would result in the hydrogen migrating to the cold contact location and formation of hydride blisters. These blisters could eventually rupture the pressure tube by the DHC (delayed hydrogen cracking) mechanism. 2 refs., 2 figs.

  6. Thorium utilisation in thermal reactors

    International Nuclear Information System (INIS)

    Balakrishnan, K.

    1997-01-01

    It is now more or less accepted that the best way to use thorium is in thermal reactors. This is due to the fact that U233 is a good material in the thermal spectrum. Studies of different thorium cycles in various reactor concepts had been carried out in the early days of nuclear power. After three decades of neglect, the world is once again looking at thorium with some interest. We in India have been studying thorium cycles in most of the existing thermal reactor concepts, with greater emphasis on heavy water reactors. In this paper, we report some of the work done in India on different thorium cycles in the Indian pressurized heavy water reactor (PHWR), and also give a description of the design of the advanced heavy water reactor (AHWR). (author). 1 ref., 2 tabs., 5 figs

  7. Stresses imposed by coolant channel end shield interaction in 200 MWe PHWR

    International Nuclear Information System (INIS)

    Mehra, V.K.; Singh, R.K.; Soni, R.S.; Kushwaha, H.S.; Kakodkar, A.

    1983-01-01

    End shield of 200 MWe Pressurised Heavy Water Reactor (PHWR) is a composite tube sheet structure consisting of two circular tube sheets joined together by lattice tubes. Each lattice tube houses a coolant channel assembly which is connected to the end shield through shock absorber device. End shield assembly is suspended in the vault by hanger rods and its horizontal position is controlled by a set of pre-compressed springs. Coolant channel assemblies elongate due to their exposure to fast neutron flux in the reactor. This permanent elongation is monitored periodically. When growth of the channel exceeds a present value, it is prevented from further elongation by the shock absorbing device. Resultant force exerted on the end shield makes it move. This paper describes a numerical method used for evaluating these forces and movement of the end shield. Stresses produced by these forces are calculated by using finite element method. Typical stress values are verified by strain gauge measurements. (orig.)

  8. UO2 - Zr chemical interaction of PHWR fuel pins under high temperature

    International Nuclear Information System (INIS)

    Majumdar, P.; Mukhopadhyay, D.; Gupta, S.K.

    2001-01-01

    At high temperature Zircaloy clad interacts with the UO 2 fuel as well as with the steam to produce oxide layer of a-Zr(O) and ZrO 2 . This layer formation significantly reduces the structural strength of the clad. A computer code SFDCPA/MOD1 has been developed to simulate the interaction and predict the oxide layer thickness for any accidental transient condition. It is well validated with published experimental data on the isothermal and transient temperature condition. The program is applied to Indian Pressurized Heavy Water Reactor (PHWR) fuel pin under certain severe transient condition where it experiences temperature above 1000 C. The study gives an idea of the un-oxidized thickness of Zircaloy, which is an important criterion for fuel integrity. (author)

  9. The power control system of the Siemens-KWU nuclear power station of the PWR [pressurized water reactors] type

    International Nuclear Information System (INIS)

    Huber, Horacio

    1989-01-01

    Starting with the first nuclear power plant constructed by Siemens AG of the pressurized light water reactor line (PWR), the Obrigheim Nuclear Power Plant (340 MWe net), until the recently constructed plants of 1300 MWe (named 'Konvoi'), the design of the power control system of the plant was continuously improved and optimized using the experience gained in the operation of the earlier generations of plants. The reactor power control system of the Siemens - KWU nuclear power plants is described. The features of this design and of the Siemens designed heavy water power plants (PHWR) Atucha I and Atucha II are mentioned. Curves showing the behaviour of the controlled variables during load changes obtained from plant tests are also shown. (Author) [es

  10. Partitioning of actinide from simulated high level wastes arising from reprocessing of PHWR fuels: counter current extraction studies using CMPO

    International Nuclear Information System (INIS)

    Deshingkar, D.S.; Chitnis, R.R.; Wattal, P.K.; Theyyunni, T.K.; Nair, M.K.T.; Ramanujam, A.; Dhami, P.S.; Gopalakrishnan, V.; Rao, M.K.; Mathur, J.N.; Murali, M.S.; Iyer, R.H.; Badheka, L.P.; Banerji, A.

    1994-01-01

    High level wastes (HLW) arising from reprocessing of pressurised heavy water reactor (PHWR) fuels contain actinides like neptunium, americium and cerium which are not extracted in the Purex process. They also contain small quantities of uranium and plutonium in addition to fission products. Removal of these actinides prior to vitrification of HLW can effectively reduce the active surveillance period of final waste form. Counter current studies using indigenously synthesised octyl (phenyl)-N, N-diisobutylcarbamoylmethylphosphine oxide (CMPO) were taken up as a follow-up of successful runs with simulated sulphate bearing low acid HLW solutions. The simulated HLW arising from reprocessing of PHWR fuel was prepared based on presumed burnup of 6500 MWd/Te of uranium, 3 years cooling period and 800 litres of waste generation per tonne of fuel reprocessed. The alpha activity of the HLW raffinate after extraction with the CMPO-TBP mixture could be brought down to near background level. (author). 13 refs., 2 tabs., 12 figs

  11. Partitioning of actinide from simulated high level wastes arising from reprocessing of PHWR fuels: counter current extraction studies using CMPO

    Energy Technology Data Exchange (ETDEWEB)

    Deshingkar, D S; Chitnis, R R; Wattal, P K; Theyyunni, T K; Nair, M K.T. [Bhabha Atomic Research Centre, Bombay (India). Process Engineering and Systems Development Div.; Ramanujam, A; Dhami, P S; Gopalakrishnan, V; Rao, M K [Bhabha Atomic Research Centre, Bombay (India). Fuel Reprocessing Group; Mathur, J N; Murali, M S; Iyer, R H [Bhabha Atomic Research Centre, Bombay (India). Radiochemistry Div.; Badheka, L P; Banerji, A [Bhabha Atomic Research Centre, Bombay (India). Bio-organic Div.

    1994-12-31

    High level wastes (HLW) arising from reprocessing of pressurised heavy water reactor (PHWR) fuels contain actinides like neptunium, americium and cerium which are not extracted in the Purex process. They also contain small quantities of uranium and plutonium in addition to fission products. Removal of these actinides prior to vitrification of HLW can effectively reduce the active surveillance period of final waste form. Counter current studies using indigenously synthesised octyl (phenyl)-N, N-diisobutylcarbamoylmethylphosphine oxide (CMPO) were taken up as a follow-up of successful runs with simulated sulphate bearing low acid HLW solutions. The simulated HLW arising from reprocessing of PHWR fuel was prepared based on presumed burnup of 6500 MWd/Te of uranium, 3 years cooling period and 800 litres of waste generation per tonne of fuel reprocessed. The alpha activity of the HLW raffinate after extraction with the CMPO-TBP mixture could be brought down to near background level. (author). 13 refs., 2 tabs., 12 figs.

  12. 3D modeling of the primary circuit in the reactor pressure vessel of a PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Ramajo, Damian, E-mail: dramajo@santafe-conicet.gov.ar; Corzo, Santiago; Schiliuk, Nicolas; Nigro, Norberto

    2013-12-15

    A computational fluid dynamics (CFD) simulation of the reactor pressure vessel (RPV) of the pressurized heavy water reactor (PHWR) of 745 electrical MW Atucha II nuclear power plant was carried out. A three dimensional (3D) detailed model was employed to simulate coolant circuit considering the upper and lower plenums, the downcomer and the hot and cold legs. Control rods and coolant channel tubes at the upper plenum were included to quantify the mixing flow with more realism. The whole set of 451 coolant channels were modeled by means of a zero dimensional methodology. That is, the effect of each coolant channel was modeled through the introduction of a source point at the upper plenum and a sink point at the lower plenum. For each coupled sink/source points (SSP) the mass, momentum and energy balance were solved considering the local pressure difference and the temperature between the corresponding points where sinks and sources were placed. Based on this strategy, three models with increasingly level of approximation were implemented. For the first model the 451 coolant channels were reduced to only 57 pairs of SSP to represent all the coolant channels, concentrating the effect of several coolant channels in a unique pair of sink and source while taking into account geometric design details. For the second model, 225 pairs of SSP were introduced. Finally, for the third model each one of the 451 coolant channels were modeled by means of one pair of SSP. Depending on the coolant channel location, the radial power distribution and the pressure loss caused by the corresponding flow restrictor present by design were considered. Simulations carried out give insight in the complexity of the flow. As expected, the greater the details of the model the better the accuracy reached in the representation of the RPV behavior. In addition, the flow distributor located at the lower plenum showed to be very efficient since, the mass flow at each channel was found to be fairly

  13. Licensing assessment of the CANDU pressurized heavy water reactor. Volume I. Preliminary safety information document

    International Nuclear Information System (INIS)

    1977-06-01

    The PHWR design contains certain features that will require significant modifications to comply with USNRC siting and safety requirements. The most significant of these features are the reactor vessel; control systems; quality assurance program requirements; seismic design of structures, systems and components; and providing an inservice inspection program capability. None of these areas appear insolvable with current state-of-the-art engineering or with upgrading of the quality assurance program for components constructed outside of the USA. In order to be licensed in the U. S., the entire reactor assembly would have to be redesigned to comply with ASME Boiler and Pressure Vessel Code, Section III, Division 1 and Division 2. A summary matrix at the end of this volume identifies compliance of the systems and structures of the PHWR plant with the USNRC General Design Criteria. The matrix further identifies the estimated incremental cost to a 600 MWe PHWR that would be required to license the plant in the U. S. Further, the matrix identifies whether or not the incremental licensing cost is size dependent and the relative percentage of the base direct cost of a Canadian sited plant

  14. Xenon oscillation in a large PHWR core (Atucha II type): TRISIC code applicability

    International Nuclear Information System (INIS)

    Solanilla, Roberto

    2000-01-01

    A three dimensional nuclear reactor simulation code (TRISIC) was developed many years ago to design a PHWR (pressurizer heavy water reactors - Atucha type) based in the 'source-sink model' (heterogeneous theory). The limited processor computational performance available at that time was the constraint of the code when a detailed reactor description was necessary. A modern PC (pentium) code version with a full reactor core representation (461 fuel channels) including diagonal control rod banks and flux-reading detectors with theirs tube guide was used in the present paper for simulation of the Xenon transient when a local asymmetric perturbation was produced in a large core (Atucha II type). The results obtained and the computer time required for the 70 hour's simulation with an adequate time step, established the potential of the code to deal with this kind of transients. The paper shows that the method of TRISIC allows to detect and control azimuthal, radial and axial oscillation. This code is a proper way to elaborate a program of control rods movement from the flux reading detectors to damp the oscillation. TRISIC could also be a accurate tool to supervise the full core flux distribution in real time during the operation of the reactor. (author)

  15. CLUB - a multigroup integral transport theory code for lattice calculations of PHWR cells

    International Nuclear Information System (INIS)

    Krishnani, P.D.

    1992-01-01

    The computer code CLUB has been developed to calculate lattice parameters as a function of burnup for a pressurised heavy water reactor (PHWR) lattice cell containing fuel in the form of cluster. It solves the multigroup integral transport equation by the method based on combination of small scale collision probability (CP) method and large scale interface current technique. The calculations are performed by using WIMS 69 group cross section library or its condensed versions of 27 or 28 group libraries. It can also compute Keff from the given geometrical buckling in the input using multigroup diffusion theory in fundamental mode. The first order differential burnup equations can be solved by either Trapezoidal rule or Runge-Kutta method. (author). 17 refs., 2 figs

  16. Ultrasonic evaluation of end cap weld joints of fuel elements of pressurized heavy water reactors using signal analysis methods

    International Nuclear Information System (INIS)

    Raj, B.; Thavasimuthu, M.; Subramanian, C.V.; Kalyanasundaram, P.; Rajagopalan, C.

    1992-01-01

    This paper describes the application of ultrasonic digital signal analysis for the detection of fine defects of the order of 10% or lower of wall thickness (WT) of 370 microns in the resistance welded end cap-cladding tube joints of fuel elements used in Pressurised Heavy Water Reactors (PHWR s). The results obtained for the detection of such defects, have confirmed the sensitivity and reliability of this approach, and were further validated by destructive metallography. (author)

  17. Slightly enriched uranium fuel for a PHWR

    International Nuclear Information System (INIS)

    Notari, C.; Marajofsky, A.

    1997-01-01

    An improved fuel element design for a PHWR using slightly enriched uranium fuel is presented. It maintains the general geometric disposition of the currently used in the argentine NPP's reactors, replacing the outer ring of rods by rods containing annular pellets. Power density reduction is achieved with modest burnup losses and the void volume in the pellets can be used to balance these two opposite effects. The results show that with this new design, the fuel can be operated at higher powers without violating thermohydraulic limits and this means an improvement in fuel management flexibility, particularly in the transition from natural uranium to slightly enriched uranium cycle. (author)

  18. Characteristics of pressure control system on PWR/PHWR in pile loop facility

    International Nuclear Information System (INIS)

    Sarwani; Hendro, P.; Suwoto; Sutrisno

    1998-01-01

    PWR/PHWR in-pile loop facility is used for testing of fuel element bundle which is correspond to the condition of power reactor operation. So, this facility is designed at 150 bar of pressure and 350 o C of temperature. Pressure control system is one of the components of the facility and it is equipped with 6 electrical heaters (30 KW), water spray, pressure and temperature monitors. The characterization test of pressure control system has been carried out with operating of 2 electrical heaters (10 KW). The K eff calculation value is different 5.2% from pressure in the pressure control system can be increased to 160 bar within 27 hours. After the system pressure reached the nominal pressure, the pressure control system was in the steady state condition

  19. Measurement and computation for sag of calandria tube due to irradiation creep in PHWR

    International Nuclear Information System (INIS)

    Son, S. M.; Lee, W. R.; Lee, S. K.; Lee, J. S.; Kim, T. R.; Na, B. K.; Namgung I.

    2003-01-01

    Calandria tubes and Liquid Injection Shutdown System(LISS) tubes in a Pressurized Heavy Water Reactor(PHWR) are to sag due to irradiation creep and growth during plant operation. When the sag of calandria tube becomes bigger, the calandria tube possibly comes in contact with LISS tube crossing beneath the calandria tube. The contact subsequently may cause the damage on the calandria tube resulting in unpredicted outage of the plant. It is therefore necessary to check the gap between the two tubes in order to periodically confirm no contact by using a proper measure during the plant life. An ultrasonic gap measuring probe assembly which can be inserted into two viewing ports of the calandria was developed in Korea and utilized to measure the sags of both tubes in the PHWR. It was found that the centerlines of calandria tubes and liquid injection shutdown system tubes can be precisely detected by ultrasonic wave. The gaps between two tubes were easily obtained from the relative distance of the measured centerline elevations of the tubes. Based on the irradiation creep equation and the measurement data, a computer program to calculate the sags was also developed. With the computer program, the sag at the end of plant life was predicted

  20. The Feasibility of Multidimensional CFD Applied to Calandria System in the Moderator of CANDU-6 PHWR Using Commercial and Open-Source Codes

    Directory of Open Access Journals (Sweden)

    Hyoung Tae Kim

    2016-01-01

    Full Text Available The moderator system of CANDU, a prototype of PHWR (pressurized heavy-water reactor, has been modeled in multidimension for the computation based on CFD (computational fluid dynamics technique. Three CFD codes are tested in modeled hydrothermal systems of heavy-water reactors. Commercial codes, COMSOL Multiphysics and ANSYS-CFX with OpenFOAM, an open-source code, are introduced for the various simplified and practical problems. All the implemented computational codes are tested for a benchmark problem of STERN laboratory experiment with a precise modeling of tubes, compared with each other as well as the measured data and a porous model based on the experimental correlation of pressure drop. Also the effect of turbulence model is discussed for these low Reynolds number flows. As a result, they are shown to be successful for the analysis of three-dimensional numerical models related to the calandria system of CANDU reactors.

  1. Feasibility study on production of Co-60 in PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kyung Bae; Han, Hyon Soo; Joo, Po Kook

    2000-05-01

    The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ceiling hoist system. At present, storage pool has got admission based on 400 kCi. But it is necessary to seismic analysis and design improvement of shielding to store 10 MCi (Co-60) which is the estimated Co-60 capacity produced by 3 PHWRs. According to present investigation, a production of Co-60 by PHWR and RIPE was seemed to be an economically feasible business and it was also expected that a joint venture will be able to realize by cooperation with MDS Nordion Co.

  2. Feasibility study on production of Co-60 in PHWR

    International Nuclear Information System (INIS)

    Park, Kyung Bae; Han, Hyon Soo; Joo, Po Kook

    2000-05-01

    The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ceiling hoist system. At present, storage pool has got admission based on 400 kCi. But it is necessary to seismic analysis and design improvement of shielding to store 10 MCi (Co-60) which is the estimated Co-60 capacity produced by 3 PHWRs. According to present investigation, a production of Co-60 by PHWR and RIPE was seemed to be an economically feasible business and it was also expected that a joint venture will be able to realize by cooperation with MDS Nordion Co

  3. Performance Shaping Factors Assessments and Application to PHWR Outages

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Woo

    2007-02-15

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10{sup -4} more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted

  4. Performance Shaping Factors Assessments and Application to PHWR Outages

    International Nuclear Information System (INIS)

    Lee, Seung Woo

    2007-02-01

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10 -4 more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted in changes of core damage

  5. Probabilistic integrity assessment of pressure tubes in an operating pressurized heavy water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Young-Jin; Park, Heung-Bae [KEPCO E and C, 188 Gumi-dong, Bundang-gu, Seongnam-si, Gyeonggi-do 463-870 (Korea, Republic of); Lee, Jung-Min; Kim, Young-Jin [School of Mechanical Engineering, Sungkyunkwan University, 300 Chunchun-dong, Jangan-gu, Suwon-si, Gyeonggi-do 440-746 (Korea, Republic of); Ko, Han-Ok [Korea Institute of Nuclear Safety, 34 Gwahak-ro, Yuseong-gu, Daejeon-si 305-338 (Korea, Republic of); Chang, Yoon-Suk, E-mail: yschang@khu.ac.kr [Department of Nuclear Engineering, Kyung Hee University, 1 Seocheon-dong, Giheung-gu, Yongin-si, Gyeonggi-do 446-701 (Korea, Republic of)

    2012-02-15

    Even though pressure tubes are major components of a pressurized heavy water reactor (PHWR), only small proportions of pressure tubes are sampled for inspection due to limited inspection time and costs. Since the inspection scope and integrity evaluation have been treated by using a deterministic approach in general, a set of conservative data was used instead of all known information related to in-service degradation mechanisms because of inherent uncertainties in the examination. Recently, in order that pressure tube degradations identified in a sample of inspected pressure tubes are taken into account to address the balance of the uninspected ones in the reactor core, a probabilistic approach has been introduced. In the present paper, probabilistic integrity assessments of PHWR pressure tubes were carried out based on accumulated operating experiences and enhanced technology. Parametric analyses on key variables were conducted, which were periodically measured by in-service inspection program, such as deuterium uptake rate, dimensional change rate of pressure tube and flaw size distribution. Subsequently, a methodology to decide optimum statistical distribution by using a robust method adopting a genetic algorithm was proposed and applied to the most influential variable to verify the reliability of the proposed method. Finally, pros and cons of the alternative distributions comparing with corresponding ones derived from the traditional method as well as technical findings from the statistical assessment were discussed to show applicability to the probabilistic assessment of pressure tubes.

  6. Fatigue cycles evaluation of 500 MWe PHWR coolant channel sealdisc

    International Nuclear Information System (INIS)

    Chawla, D.S.; Vaze, K.K.; Kushwaha, H.S.; Gupta, K.S.; Bhambra, H.S.

    1998-07-01

    At each end of coolant channel there is one sealing plug assembly. The sealdisc is a part of sealing plug assembly. The sealdisc is used to avoid leakage of heavy water. The importance of sealdisc can be understood by the fact that there are 784 sealdiscs in one 500 MWe PHWR unit. During the life time of reactor the sealdisc will be subjected to cyclic loads due to reactor startup, shutdown, power setback and also due to refuelling operations. Excessive reversal of stresses may lead to fatigue failure. The sealdisc failure may cause loss of coolant accidents. Since sealdisc is safety class 1 component, it has to be qualified according to ASME Section III Division 1 NB. For cyclic loads, the fatigue analysis is essential to assess the allowable number of cycles and also to check the total usage factor due to different cyclic loads. To evaluate the allowable fatigue cycles, the analysis is carried out using finite element method. The present report deals with the fatigue cycles evaluation of 500 MWe PHWR sealdisc. The finite element model having eight noded axisymmetric elements is used for the analysis. The various loads considered in the analysis are mechanical loads arising due to refuelling operations and number of temperature-pressure transients. During refuelling, the sealdisc is removed and reinstalled back by use of fuelling machine ram which applies load at centre as well as at rocker point of sealdisc. The stress analysis is carried out for each stage of loading during refuelling and fatigue cycles are evaluated. For temperature transient, decoupled thermal analysis is carried out. At various instants of time, the stresses are computed using temperatures calculated in thermal analysis. The pressure variation is also considered along with temperature variation. The fatigue cycles are evaluated for each transient using maximum alternating stress intensities. The usage factors are calculated for various temperature/pressure transients and refuelling loads

  7. Impacting effects of seismic loading in feeder pipes of PHWR power plants

    International Nuclear Information System (INIS)

    Kumar, R.

    1996-01-01

    The core of a pressurized heavy water reactor (PHWR) consists of a large number of fuel channels. These fuel channels are connected to the feeder pipes through which the heavy water flows and transports heat from the reactor core to the steam generators. The feeder pipes are several hundreds in number. They run close to each other with small gaps and have several bends. Thus they represent a complex piping system. Under seismic loading, the adjacent feeder pipes may impact each other. In this paper a simplified procedure has been established to assess such impacting effects. The results of the proposed analysis include bending moment and impact force, which provide the stresses due to impacting effects. These results are plotted in nondimensional form so that they could be utilized for any set of feeder pipes. The procedure used for studying the impacting effects includes seismic analysis of individual feeder pipes without impacting effects, selection of pipes for impact analysis, and estimating their maximum impact velocity. Based on the static and dynamic characteristics of the selected feeder pipes, the maximum bending moment, impact force, and stresses are obtained. The results of this study are useful for quick evaluation of the impacting effects in feeder pipes

  8. Korean experience in CANDU-PHWR operation

    International Nuclear Information System (INIS)

    Sang-kee Park

    1987-01-01

    Among KEPCO's 9 nuclear power units, Korea Nuclear Unit No. 3, the Wolsung Nuclear Power Plant is the only CANDU-PHWR Unit, while the rest of 8 others are PWR units. The unit was designed by Atomic Energy of Canada, Ltd(AECL) of Canada, who also perfomed overall project management for the plant construction under the provisions and arrangement of the relevant contracts. The gross electrical output of the plant is 678.7 MWe and thermal output of the reactor is 2061 MWth. While these figures lead to lower plant eficiency than LWR counterparts, unit energy cost for fuel is more favorable than LWRs because natural uranium is utilized for the fuel bundles, some of which are already being fabricated domestically. Annual capacity factors for 1983 and 1984 could have been improved, if two major planned outages for the modification works on steam generator internals and one major forced outage form the heavy water spill incident could be eliminated. The heavy water spill incident in November, 1984 brought plant staffs many lessons to learn and many things to contemplate. Unique design concepts and features such as on-power refuelling, poison prevent mode, versatile plant control system built around digital computers and power step back/set back logics may be credited for these relatively good plant performances. Human related factors such as staff's technical capabilities and strong will toward good performance were other elements which could not be overlooked

  9. Korean experience in CANDU-PHWR operation

    International Nuclear Information System (INIS)

    Park, S.K.

    1988-01-01

    Among KEPCO's 9 nuclear power units, Korea Nuclear Unit No. 3, the Wolsung Nuclear Power Plant is the only CANDU-PHWR Unit, while the rest of 8 others are PWR units. The unit was designed by Atomic Energy of Canada, Ltd. of Canada, who also performed overall project management for the plant construction under the provisions and arrangement of the relevant contracts. The gross electrical output of the plant is 678.7 MWe and thermal output of the reactor is 2061 MWth. While these figures lead to lower plant efficiency than LWR counterparts, unit energy cost for fuel is more favorable than LWRs because natural uranium is utilized for the fuel bundles, some of which are already being fabricated domestically. Annual capacity factors for 1983 and 1984 could have been improved, if two major planned outages for the modification works on steam generator internals and one major forced outage from the heavy water spill incident could be eliminated. The heavy water spill incident in November, 1984 brought plant staffs many lessons to learn and many things to contemplate. Unique design concepts and features such as on-power refuelling, poison prevent mode, versatile plant control system built around digital computers and power step back/set back logics may be credited for these relatively good plant performances. Human related factors such as staff's technical capabilities and strong will toward good performance were other elements which could not be overlooked

  10. An evolutionary approach to advanced water cooled reactors

    International Nuclear Information System (INIS)

    Antariksawan, A.R.; Subki, I.

    1997-01-01

    Based on the result of the Feasibility Study undertaken since 1991, Indonesia may enter in the new nuclear era by introduction of several Nuclear Power Plants in our energy supply system. Requirements for the future NPP's are developed in two step approach. First step is for the immediate future that is the next 50 years where the system will be dominated by A-LWR's/A-PHWR's and the second step is for the time period beyond 50 years in which new reactor systems may start to dominate. The integral reactor concept provides a revolutionary improvements in terms of conceptual and safety. However, it creates a new set of complex machinery and operational problems of its own. The paper concerns with a brief description of nuclear technology status in Indonesia and a qualitative assessment of integral reactor concept. (author)

  11. Emerging trends in PHWR safety - post Fukushima measures

    International Nuclear Information System (INIS)

    Nitheanandan, T.

    2015-01-01

    Nuclear power continues to be the choice for many countries that are seeking to enhance their energy security and reduce their carbon emissions. Nuclear power plants are complex systems which require multiple layers of protection. The fundamental principle of nuclear power safety technology is ‘Defence-in-Depth’ that underlies all safety activities - organizational, behavioural and technical. This provides layers of overlapping barrier protections so that, in the unlikely event that failure occurs, it would be compensated or corrected without causing harm to individuals or the public at large. Defence-in-depth encompasses prevention, control, protection, severe accident management and consequence mitigation, and offsite emergency response measures. Reactor Safety Science and Technology (S and T) has evolved over more than four decades in a number of PHWR countries. The PHWR operators, regulators and national research laboratories have dedicated S and T programs to continuously improve plant safety, operations and margins. The S and T is focused on finding simpler, less costly and more reliable safety system designs. These improvements are continuously incorporated in current units, refurbished units and proposed new builds. The Fukushima accident forced most nuclear nations to reassess and implement reactor design upgrades. The lessons learned from Fukushima have generated some nuclear safety enhancements such as: Design considerations for natural hazards, Diversity of heat sinks, Consideration of extended duration station blackout, Improvements to Severe Accident Management and SAM Operational aids, Accident instrumentation, Offsite management such as the use of predictive exposure tools, and Design considerations for Spent Fuel Pools. The plenary presentation will provide some of the emerging trends following the Fukushima accident. Examples of these emerging trends in Canada and on the international scene, will be presented. (author)

  12. Investigations on the inadvertent power increase in a PHWR as ASSET experience

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, S H [Operating Plants Safety Div., Atomic Energy Regulatory Board, Mumbai (India)

    1997-12-31

    Investigations were carried out using the ASSET methodology to find out the root cause of an incident involving inadvertent increase in reactor power in the Unit 1 of Narora Atomic Power Station (NAPS) in India. NAPS is a twin Unit, 220 MWe PHWR based power station. On December 4, 1992, when NPAS Unit 1 was operating at 130 MWe, the reactor power increased steadily on its own and touched 147 MWe, over a period of 14 minutes. The set (demand) power of the triplicated reactor regulating system had increased on its own and in turn has made the reactor to operated at higher power. The power was brought down to 120 MWe by manual intervention. Since adequate system related data during the incident was not available, laboratory studies were carried out using computer simulations for the various process disturbances which could affect the reactor regulating system, for establishing the causes of the event. 4 figs.

  13. Investigations on the inadvertent power increase in a PHWR as ASSET experience

    International Nuclear Information System (INIS)

    Kumar, S.H.

    1996-01-01

    Investigations were carried out using the ASSET methodology to find out the root cause of an incident involving inadvertent increase in reactor power in the Unit 1 of Narora Atomic Power Station (NAPS) in India. NAPS is a twin Unit, 220 MWe PHWR based power station. On December 4, 1992, when NPAS Unit 1 was operating at 130 MWe, the reactor power increased steadily on its own and touched 147 MWe, over a period of 14 minutes. The set (demand) power of the triplicated reactor regulating system had increased on its own and in turn has made the reactor to operated at higher power. The power was brought down to 120 MWe by manual intervention. Since adequate system related data during the incident was not available, laboratory studies were carried out using computer simulations for the various process disturbances which could affect the reactor regulating system, for establishing the causes of the event. 4 figs

  14. Development of 3-dimensional neutronics kinetics analysis code for CANDU-PHWR

    International Nuclear Information System (INIS)

    Kim, M. W.; Kim, C. H.; Hong, I. S.

    2005-02-01

    The followings are the major contents and scope of the research : development of kinetics power calculation module, formulation of space-dependent neutron transient analysis - implementation of 3-D and 2-G unified nodal method, verification of the kinetics module by benchmark problem - 3-D PHWR kinetics benchmark problem suggested by AECL, reactor trip simulation by shutdown system 1 in Wolsong unit 2. Development of a dynamic linked library code, SCAN D LL, for the coupled calculation with RELAP-CANDU : modeling of shutdown system 1, development of automatic shutdown module - automatic trip module based on rate log power control logic, automatic insertion of shutdown system 1. Development of a link code for coupled calculation - development of SCAN D LL(windows version), verification of coupled code by - 40% reactor inlet header break LOCA power pulse, 100% reactor outlet header break LOCA power pulse, 50% pump suction break LOCA power pulse

  15. Design of reactor components (non replaceable) of 500 MWe PHWR for enhanced life

    International Nuclear Information System (INIS)

    Dwivedi, K.P.; Seth, V.K.

    1994-01-01

    A nuclear power station is characterised by large initial cost and low operating cost. So a plant which is capable of operating for a longer period of time will be economically more attractive. In the past approach had been to design a nuclear power plant for 30 to 40 years of life time. However, with the improvement in technology and incorporation of redundant and diverse safety features it is now possible to design a nuclear power plant for longer life. Now internationally it is being realised that without sacrificing safety features, plant life should be extended till the cost of maintenance or refurbishment is larger than the cost of the replacement capacity. In order to meet the objective of long life, for the components which cannot be easily replaced the life time of about 100 years is being considered as the design objective. For other items replacement, layout space, shielding, access route and lifting capacity and component design are receiving additional emphasis so as to provide a long total station life time. With the above background, design improvements to enhance the life of reactor components for 500 MWe PHWR namely calandria, end shields and calandria vault liners which cannot be replaced and on which any repair is extremely difficult, have been made. This paper deals with design life of these components and the modifications incorporated in the design. (author). 3 refs., 2 tabs., 3 figs

  16. Application of the dose limitation system to the control of carbon-14 releases from heavy-water-moderated reactors

    International Nuclear Information System (INIS)

    Beninson, D.; Gonzalez, A.J.

    1982-01-01

    Heavy-water-moderated reactors produce substantially more carbon-14 than light-water reactors. Applying the principles of the systems of dose limitation, the paper presents the rationale used for establishing the release limit for effluents containing this nuclide and for the decisions made regarding the effluent treatment in the third nuclear power station in Argentina. Production of carbon-14 in PHWR and the release routes are analysed in the light of the different effluent treatment possibilities. An optimization assessment is presented, taking into account effluent treatment and waste management costs, and the collective effective dose commitment due to the releases. The contribution of present carbon-14 releases to future individual doses is also analysed in the light of an upper bound for the contribution, representing a fraction of the individual dose limits. The paper presents the resulting requirements for the effluent treatment regarding carbon-14 and the corresponding regulatory aspects used in Argentina. (author)

  17. A final report on stress analysis of seal disc of 500 MWe PHWR

    International Nuclear Information System (INIS)

    Chawla, D.S.; Dutta, B.K.; Kushwaha, H.S.; Kakodkar, A.; Sanatkumar, A.

    1989-01-01

    In Pressurised Heavy Water Reactor (PHWR) on-power refuelling is done by use of fuelling machine. Before refuelling, sealing plug assembly is removed from the end-fitting of the coolant channel and after refuelling the sealing plug is reinstalled back in to the end-fitting. The seal disc is a part of sealing plug assembly. Its function is to create sealing action for the heavy water inside the coolant channel. A systematic developmental work is done to arrive at a final configuration of the seal disc. This is done to minimise the stresses in the body of the seal disc and at the same time to obtain required seating reaction to avoid heavy water leakage. It is observed that stresses computed for the final configuration by linear elastic analysis are more than the allowable value as per ASME Section III, Division 1. This calls for elasto-plastic analysis to find out collapse load to satisfy ASME codal limits as per special provision of NB-3228.1 (1986). The elasto-plastic analysis showed that the seal disc meets ASME codal limits for all stages of loading. (author). 8 refs., 2 tabs., 7 figs

  18. Benchmark of Atucha-2 PHWR RELAP5-3D control rod model by Monte Carlo MCNP5 core calculation

    Energy Technology Data Exchange (ETDEWEB)

    Pecchia, M.; D' Auria, F. [San Piero A Grado Nuclear Research Group GRNSPG, Univ. of Pisa, via Diotisalvi, 2, 56122 - Pisa (Italy); Mazzantini, O. [Nucleo-electrica Argentina Societad Anonima NA-SA, Buenos Aires (Argentina)

    2012-07-01

    Atucha-2 is a Siemens-designed PHWR reactor under construction in the Republic of Argentina. Its geometrical complexity and peculiarities require the adoption of advanced Monte Carlo codes for performing realistic neutronic simulations. Therefore core models of Atucha-2 PHWR were developed using MCNP5. In this work a methodology was set up to collect the flux in the hexagonal mesh by which the Atucha-2 core is represented. The scope of this activity is to evaluate the effect of obliquely inserted control rod on neutron flux in order to validate the RELAP5-3D{sup C}/NESTLE three dimensional neutron kinetic coupled thermal-hydraulic model, applied by GRNSPG/UNIPI for performing selected transients of Chapter 15 FSAR of Atucha-2. (authors)

  19. Development of in-situ laser cutting technique for removal of single selected coolant channel from pressurized heavy water reactor

    International Nuclear Information System (INIS)

    Vishwakarma, S.C.; Upadhyaya, B.N.

    2016-01-01

    We report on the development of a pulsed Nd:YAG laser based cutting technique for removal of single coolant channel from pressurized heavy water reactor (PHWR). It includes development of special tools/manipulators and optimization of laser cutting process parameters for cutting of liner tube, end fitting, bellow lip weld joint, and pressure tube stubs. For each cutting operation, a special tool with precision motion control is utilized. These manipulators/tools hold and move the laser cutting nozzle in the required manner and are fixed on the same coolant channel, which has to be removed. This laser cutting technique has been successfully deployed for removal of selected coolant channels Q-16, Q-15 and N-6 of KAPS-2 reactor with minimum radiation dose consumption and in short time. (author)

  20. Evolution of PHWR fuel transfer system based on operating experience

    International Nuclear Information System (INIS)

    Parvatikar, R.S.; Singh, Jaipal; Chaturvedi, P.C.; Bhambra, H.S.

    2006-01-01

    Fuel Transfer System facilitates loading of new fuel into Fuelling Machine, receipt of spent fuel from Fuelling Machine and its further transportation to Storage Bay. To overcome the limitations of transferring a pair of bundles in the single tube Airlock and Transfer Arm in RAPS-1 and 2/MAPS, a new concept of six tube Transfer Magazine was introduced in NAPS. This resulted in simultaneous loading of new fuel from Transfer Magazine into the Fuelling Machine and unloading of spent fuel from the Fuelling Machine through the exchange mode. It further facilitated the parallel/simultaneous operation of refuelling by Fuelling Machines on the reactor and transferring of spent fuel bundles from the Transfer Magazine to the bay. This new design of Fuel Transfer System was adopted for all standardised 220 MWe PHWRs. Based on the experience gained in 220 MWe PHWRs in the area of operation and maintenance, a number of improvements have been carried out over the years. These aspects have been further strengthened and refined in the Fuel Transfer System of 540 MWe units. The operating experience of the system indicates that the presence of heavy water in the Transfer Magazine poses limitations in its maintenance in the Fuel Transfer room. Further, Surveillance and maintenance of large number of under water equipment and associated valves, rams and underwater sensors is putting extra burden on the O and M efforts. A new concept of mobile light water filled Transfer Machine has been evolved for proposed 700 MWe PHWR units to simplify Fuel Transfer System. This has been made possible by adopting snout level control in the Fuelling Machine, elimination of Shuttle Transport System and locating the Storage Bay adjacent to the Reactor Building. This paper describes the evolution of Fuel Transfer System concepts and various improvements based on the experience gained in the operation and maintenance of the system. (author)

  1. Evolution of Flux Mapping System (FMS) from 540 MWe to 700 MWe Indian PHWR: design perspective

    International Nuclear Information System (INIS)

    Sonavani, Manojkumar; Kelkar, M.G.; Singhvi, P.K.; Roy, S.; Ingle, V.J.

    2013-01-01

    The Flux Mapping System (FMS) of 700 MWe PHWR computes a detailed flux/power distribution of the reactor core using modal synthesis method and is also generate setback on different parameters by monitoring thermal neutron flux at more than 100 points inside the reactor core. These types of setbacks are introduced first time in Indian PHWRs. The paper brings out the Evolution of Flux Mapping System (FMS) from 540 MWe to 700 MWe and the overall design philosophy. The paper emphasizes on comparisons between 540 MWe and 700 MWe design, considerations for architectural design and setbacks for 700 MWe. (author)

  2. Innovations in PHWR design, integration of nuclear power stations into power systems and role of small size nuclear power plants in a developing country

    International Nuclear Information System (INIS)

    Mehta, S.K.; Kakodkar, A.; Balakrishnan, M.R.; Ray, R.N.; Murthy, L.G.K.; Chamany, B.F.; Kati, S.L.

    1977-01-01

    PHWR concept of thermal reactors has been considered with a view to exploiting the limited resources of natural uranium and keeping in mind the projected nuclear power programme covering fast breeder reactors. Experience in engineering of current PHWR units in India, gradual build up of necessary infrastructure and operational experience with one unit, have helped in building up design and technological capability in the country. The R and D facilities have been so planned that additional data required for the design of bigger reactor units (i.e.500/600 MWe) could be generated with minimal augmentation. Satisfactory operation of a nuclear power station demands certain prerequisites from the connected power system. The grid should have load patterns suitable for base load operation of these stations, should be stiff so far as voltage and frequency fluctuations are concerned and should have high reliability. A typical power grid in this country is characterised by heavy loads during peak hours and very light loads during night. Regional grids are of small size and the few interconnections existing between the regional grids consist of weak tie lines. Amongst all types of the power stations, it is the nuclear system which undergoes maximum strain and economic penalty while operating when connected to such a power system. Consistent with the above, phase installation of small-size power reactor units of about 200 MWe capacity may facilitate setting up of larger unit sizes at a later date. The effect of any possible reduction in the capital cost of a larger unit power station will enable the power station to partially meet the demand of the more productive types of loads. This paper deals with some of the major design changes that are being incorporated in the PHWR type power reactors currently being set up and the research and development back-up required for the purpose. Since the unit sizes of the power reactors presently contemplated are small compared to nuclear

  3. Modelling of activity transport in PHWR

    International Nuclear Information System (INIS)

    Veena, S.N.; Rangarajan, S.; Narasimhan, S.V.; Horvath, G.L.

    2000-01-01

    The modelling of mass and activity transport in PHWR is of importance in predicting the build up of radiation field in and around the Primary Heat Transport system which will consequently help in planning the Dilute Chemical Decontamination and man rem budgeting. Modeling also helps in understanding the different parameters controlling the transport behaviour. Some of the important parameters include coolant chemistry like pH, physical parameters like temperature, the nature of the corrosion film and hence the effect of passivation techniques. VVER code for activity transport uses six nodes for the primary system and is essentially devised for stainless steel system. In the present work though based on this model, major modifications have been incorporated to suit the PHWR conditions. In the code, the PHT system of PHWR is suitably divided into 14 nodes, 5 in-core and 9 out of core nodes based on material and heat transfer properties. This paper describes the mechanisms involved in the various processes like generation of corrosion products, their release as well as their transport into the primary coolant, the activation of inactive corrosion product nuclides and the build up of radiation field due to 60 Co around the PHT system. (author)

  4. Thermal hydraulic simulation of the CANDU nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Athos M.S.S. de; Ramos, Mario C.; Costa, Antonella L.; Fernandes, Gustavo H.N., E-mail: athos1495@yahoo.com.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Departamento de Engenharia Nuclear; Instituto Nacional de Ciência e Tecnologia de Reatores Nucleares Inovadores (INCT/CNPq), Rio de janeiro, RJ (Brazil)

    2017-07-01

    The CANDU (Canada Deuterium Uranium) is a Canadian-designed power reactor of PHWR type (Pressurized Heavy Water Reactor) that uses heavy water (deuterium oxide) for moderator and coolant, and natural uranium for fuel. There are about 47 reactors of this type in operation around the world generating more than 23 GWe, highlighting the importance of this kind of device. In this way, the main purpose of this study is to develop a thermal hydraulic model for a CANDU reactor to aggregate knowledge in this line of research. In this way, a core modeling was performed using RELAP5-3D code. Results were compared with reference data to verify the model behavior in steady state operation. Thermal hydraulic parameters as temperature, pressure and mass flow rate were verified and the results are in good agreement with reference data, as it is being presented in this work. (author)

  5. Studies on flow induced vibration of reactivity devices of 700 MWe Indian PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Prabhakaran, K.M., E-mail: kmprabha@yahoo.com [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai 400 085 (India); Goyal, P.; Dutta, Anu; Bhasin, V.; Vaze, K.K.; Ghosh, A.K. [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai 400 085 (India); Pillai, Ajith V.; Mathew, Jimmy [Nuclear Power Corporation of India Ltd., Mumbai 400 094 (India)

    2012-03-15

    Highlights: Black-Right-Pointing-Pointer FIV studies on internals of heavy water filled calandria of 700 MWe Indian PHWR is presented. Black-Right-Pointing-Pointer This includes CFD and structural dynamic analysis to predict the dynamic behavior of component lying inside calandria. Black-Right-Pointing-Pointer Results of these calculations as well as conclusions from this investigation are presented. Black-Right-Pointing-Pointer It is established that FIV is not a concern in the present design of calandria internals. - Abstract: Component failures due to excessive flow-induced vibration are still affecting the performance and reliability of nuclear power stations. Tube failures due to fretting-wear in nuclear steam generators, and vibration related damage of reactor internals are of particular concern. In the Indian nuclear industry, flow induced vibrations are assessed early in the design process and the results are incorporated in the design procedures. In this paper the details of flow induced vibration studies on internals like liquid zone control unit and poison injection units of heavy water filled calandria of 700 MWe Indian pressurized heavy water reactor is given. This includes computational fluid dynamics studies from which the velocities are extracted for the components lying inside the calandria. With these velocities as input, further studies are performed to predict the dynamic behavior of these components. Results of these calculations as well as conclusions derived from this investigation are presented. Based on the studies it has been established that flow induced vibration is not a concern in the present design of 700 MWe calandria internals.

  6. Aspects on optimization of natural uranium fuel utilization in heavy water reactors

    International Nuclear Information System (INIS)

    1978-08-01

    This paper is dealing with a possibility to decrease the natural uranium consumption of CANDU PHWR using the once-through cycle. This possibility is based on the utilization of slightly enriched uranium. The optimal two-zone structure of a reactor using natural uranium is found out. The optimal criterium is the maximization of the burnup (equivalent to minimization of uranium requirements) with a constraint on power density radial uniformity factor. As regards the enriched uranium, the optimal enrichment and the two-zone structure of a reactor which minimizes the natural uranium requirement with constraints on uniformity factor and maximum burnup are established. Corresponding to a maximum burnup of 16,000 MWd/t and 1% enrichment, the natural uranium requirement is found to be 10% less than that of the natural uranium reactor

  7. Fuel handling system of Indian 500 MWe PHWR-evolution and innovations

    International Nuclear Information System (INIS)

    Sanatkumar, A.; Jit, I.; Muralidhar, G.

    1996-01-01

    India has gained rich experience in design, manufacture, testing, operation and maintenance of the Fuel Handling System of CANDU type PHWRs. When design and layout of the first 500 MWe PHWR was being evolved, it was possible for us to introduce many special and innovative features in the Fuel Handling System which are friendly for operations and maintenance personnel. Some of these are: Simple, robust and modular mechanisms for ease of maintenance; Shorter turnaround time for refuelling a channel by introduction of transit equipment between the Fuelling Machine (FM) Head and light water equipment; Optimised layout to transport spent fuel in straight and short path and also to facilitate direct wheeling out of the FM Head from the Reactor Building to the Service Building; Provision to operate the FM Head even when the Primary Heat Transport (PHT) System is open for maintenance; Control-console engineered for carrying out refuelling operations in the sitting position; and, Dedicated calibration and maintenance facility to facilitate quick replacement of the FM Head as a single unit. The above special features have been described in this paper. (author). 7 figs

  8. Fuel handling system of Indian 500 MWe PHWR-evolution and innovations

    Energy Technology Data Exchange (ETDEWEB)

    Sanatkumar, A; Jit, I; Muralidhar, G [Nuclear Power Corporation of India Ltd., Mumbai (India)

    1997-12-31

    India has gained rich experience in design, manufacture, testing, operation and maintenance of the Fuel Handling System of CANDU type PHWRs. When design and layout of the first 500 MWe PHWR was being evolved, it was possible for us to introduce many special and innovative features in the Fuel Handling System which are friendly for operations and maintenance personnel. Some of these are: Simple, robust and modular mechanisms for ease of maintenance; Shorter turnaround time for refuelling a channel by introduction of transit equipment between the Fuelling Machine (FM) Head and light water equipment; Optimised layout to transport spent fuel in straight and short path and also to facilitate direct wheeling out of the FM Head from the Reactor Building to the Service Building; Provision to operate the FM Head even when the Primary Heat Transport (PHT) System is open for maintenance; Control-console engineered for carrying out refuelling operations in the sitting position; and, Dedicated calibration and maintenance facility to facilitate quick replacement of the FM Head as a single unit. The above special features have been described in this paper. (author). 7 figs.

  9. The PHWR of Siemens as appropriate type of the SMPR-class

    International Nuclear Information System (INIS)

    Herzog, G.; Doerfler, U.; Loos, F.

    1988-01-01

    Siemens started its NPP-activities with the development and construction of a number of small and medium size power reactor (SMPR) plants, using different reactor types (PHWRs, PWRs and BWRs). Siemens applied its proven technological modules successfully to all types of nuclear power plants as it is demonstrated by the high availability figures published every year. Based on the experience gained from Atucha I and II, the Argentinian engineering company ENACE (of which KWU holds 25% of the shares) has developed the ARGOS 380, a NPP in the SMPR-class, as an advanced continuation of the KWU PHWR series. The technology transfer provided by Siemens in the course of NPP construction includes all activities in the engineering, construction, manufacturing and erection/commissioning field. Additionally Siemens is prepared to assist in the transfer of manufacturing know-how. On the basis of its successful activities in this field for years, Siemens disposes of all instruments for an efficient know-how transfer. (orig.)

  10. Probability safety assessment activities in India for new and advanced reactors

    International Nuclear Information System (INIS)

    Guptan, R.; Ghagde, S.G.; Nama, R.; Varde, P.V.; Vinod, G.; Arul, J.; Solanki, R.B.

    2012-01-01

    This paper discusses, in brief, the salient features of the Level 1 PSA for New and Advanced reactors in India. The features of Level 1 PSA for new reactors are being discussed through a case study of 540 MWe twin unit (comprises of Unit 3 and 4) PHWRs at TAPS. The reactors uses Heavy water moderator and pressurized heavy water coolant, natural uranium fuel and horizontal pressure tubes. The major feature of PSA of advanced reactors is also discussed through the specific issues that were encountered during PSA modeling of AHWR (Advanced Heavy Water Reactor) and 700 MWe PHWR. The results of the PSA indicate that a fairly high level of redundancies exists in TAPS-3 and -4 design. It is recommended that staggered testing philosophy should be adopted especially for Emergency Core Cooling System, to reduce the probability of common cause failure among the motorized valves. It is also recommended to emphasize the importance of Small Break LOCA in general and their consequences in the licensing process of the plant operators

  11. Status of fast reactor development in India (April 1996 - March 1997)

    International Nuclear Information System (INIS)

    Bhoje, S.B.

    1998-01-01

    India generated 395 TWh of electricity during, 4 April 1996 to March 1997. Oil import bill during the year was $9.3 billion. The operating performance of the thermal power reactors has considerably improved during the year and has enhanced the confidence level in nuclear energy in the government and the public. Construction of 4x220 MWe PHWR is continued at two locations. Start of construction of 2x220 MWe PHWR, 2x500 MWe PHWR and 2x1000 MWe WWER (Russian collaboration) and 500 MWe PFBR have been proposed in the IX Plan (1997- 2002). The 13 party coalition government is discussing the IX plan proposals in the power sector. Operation of FBTR at 10.5 MWt is continued The maximum fuel burnup reached is 32,000 MWd/t without any failure. Targeted burnup is 50,000 MWd/t. Post irradiation examination has been completed on one fuel subassembly taken out at 25,000 MWd/t. The performance of the fuel is very good. Turbine was rolled up to synchronous speed of 3000 rpm several times during the year and operation was found to be smooth. TG synchronisation with grid will be achieved during the reactor operation at 12.5 MWt, with the addition of fuel subassemblies in the core. All the activities related to the revision of conceptual design from 4 loop to 2 loop concept are almost complete for the 500 MWe Prototype Fast Breeder Reactor. The main options for the reactor are sodium coolant, pool type, MOX fuel, 2 primary sodium pumps, 2 secondary loops with 4 SG in each loop. The important design activities carried out during the year are plant dynamic studies, decay heat removal analysis, design of pump to grid plate pipe, scram and LOR parameters, location of secondary sodium pump in the secondary sodium circuit and design of fuel handling machines. Important experimental R and D work carried out during the year were testing of prototype primary sodium pump in water, operation of a large sodium test rig to study the heat and mass transfer in the cover gas, testing of dummy fuel

  12. Pressurized Water Reactors (PWR) and Boiling Water Reactors (BWR) are compared

    International Nuclear Information System (INIS)

    Greneche, D.

    2014-01-01

    This article compares the 2 types of light water reactors that are used to produce electricity: the Pressurized Water Reactor (PWR) and the Boiling Water Reactor (BWR). Historically the BWR concept was developed after the PWR concept. Today 80% of light water reactors operating in the world are of PWR-type. This comparison is comprehensive and detailed. First the main technical features are reviewed and compared: reactor architecture, core and fuel design, reactivity control, reactor vessel, cooling systems and reactor containment. Secondly, various aspects concerning reactor operations like reactor control, fuel management, maintenance, inspections, radiation protection, waste generation and reactor reliability are presented and compared for both reactors. As for the issue of safety, it is highlighted that the accidental situations are too different for the 2 reactors to be compared. The main features of reactor safety are explained for both reactors

  13. New fuel advanced heavy water reactors

    International Nuclear Information System (INIS)

    Notari, Carla

    1999-01-01

    A redesign of the PHWR fuel element (FE) to be used in all Argentine nuclear power plants has been proposed elsewhere. This new FE presents several characteristics aimed to an improved in-core performance and economical benefits derived from the unification of most of the fabrication processes that today constitute two different production lines: one for Embalse nuclear power plant CANDU type fuel and another for Atucha I. Atucha I and Embalse, the two operating nuclear power plants in Argentina, are PHWR of different conception. Atucha I (357 M we) is of pressure vessel type and the fuel elements are full-length assemblies (530 cm of active length) with 36 uranium rods in the cluster and a support one in the outer ring. Embalse (648 M we) is a CANDU pressure tube reactor fuelled with the well known 37 rod / 50 cm length fuel bundles, twelve of which are loaded in each channel. The more relevant changes in the proposed design are an increased subdivision of the fuel material in 52 rods and a 100 cm long bundle. The combined features give the adequate channel pressure drop. The proposed CARA design shows a superior neutronic performance than the standard PHWR fuel elements currently used in Atucha I and Embalse nuclear power plants. A variant of the CARA FE consisting in the elimination of the central four rods, leaving 48 rods and a central free space, is strongly recommended because it saves materials (less uranium, less sheaths) with no loss of burnup. The central D 2 O zone allows a better utilization of the inner rods and compensates the diminished uranium loading. In Embalse no differences in core physics are expected except the beneficial decrease in linear power density. In Atucha I besides the lower power density, a higher exit burnup appears as a consequence of the higher uranium inventory. The exit burnup figures have been calculated with cell and reactor models and the result is that similar fuel management schemes as the proposed for Atucha I for the

  14. Annual progress report for 1982 of Theoretical Reactor Physics Section

    International Nuclear Information System (INIS)

    Rastogi, B.P.; Kumar, Vinod

    1983-01-01

    The progress of work done in the Theoretical Reactor Physics Section of the Bhabha Atomic Research Centre, Bombay, during the calendar year 1982 is reported in the form of write-ups and summaries. The main thrust of the work has been to master the neutronic design technology of four different types of nuclear reactor types, namely, pressurized heavy water reactors, boiling light water reactors, pressurized light water reactors and fast breeder reactors. The development work for the neutronic analysis, fuel design, and fuel management of the BWR type reactors of the Tarapur Atomic Power Station has been completed. A new reactor simulator system for PHWR design analysis and core follow-up was completed. Three dimensional static analysis codes based on nodal and finite element methods for the design work of larger size (500-750 MWe) reactors have been developed. Space link kinetics codes in one, two and three dimensions for above-mentioned reactor systems have been written and validated. Fast reactor core disruptive analysis codes have been developed. In the course of R and D work concerning various types of reactor projects, investigations were also carried in the allied areas of Monte Carlo techniques, integral transform methods, path integral methods, high spin states in heavy nuclei and a hydrodynamics model for a laser driven fusion system. (M.G.B.)

  15. Improved techniques for appendage attachment to PHWR fuel elements

    International Nuclear Information System (INIS)

    Raj, R.N.J.; Laxminarayana, B.; Narayanan, P.S.A.; Gupta, U.C.; Varma, B.P.; Sinha, K.K.

    1995-01-01

    Nuclear Fuel Complex, India switched-over to split-wart type PHWR fuel bundles in mid-80s. Since then over 60,000 bundles of this type have been fabricated for Indian PHWRs. After considering various technical aspects, resistance welding was chosen for appendage attachment to the fuel elements. The paper describes experiences in scaling up of the technique to industrial production of PHWR fuel bundles, design and development of special-purpose equipment for this purpose, and the QA procedures employed for regular production. It also deals with appendage welding of 37 Element fuel bundles and improvements planned in the appendage welding process. (author)

  16. Analysis of a PHWR slightly enriched fuel

    International Nuclear Information System (INIS)

    Notari, C.; Marajofsky, A.

    1994-01-01

    It is widely known that the use of slightly enriched uranium in PHWR reactors presents economic advantages derived from the fact that less uranium is required for producing the same amount of energy. Several studies related with the use of this alternative in Atucha I NPP have been performed. The fuel assembly geometry considered up to now has been almost identical to the natural uranium one. In this work a modification consisting in the use of annular pellets in the outer ring of the cluster is analyzed. This design produces several performance benefits. The redistribution of the power in the fuel improves the maximum to average bundle power ratio. The improvement achieved depends on the void volume in the pellets which at the same time represents a certain burnup decrease. These parameters (power ratios and burnup loss) are quantified for the Atucha I and Embalse NPPs. This design improves the fuel behaviour with respect to the burnup extension derived from the slight enrichment. It is also interesting in case an overall power increase is considered. (author). 16 refs, 8 figs, 1 tab

  17. Operating experiences of reactor shutdown system at MAPS

    International Nuclear Information System (INIS)

    Kotteeswaran, T.J.; Subramani, V.A.; Hariharan, K.

    1997-01-01

    The reactors in Madras Atomic Power Station (MAPS), Kalpakkam are Pressurised Heavy Water Reactors (PHWR) similar to RAPS, Kota. The moderator heavy water is pumped into the calandria from dump tank to make the reactor critical. Later with the calandria level held constant at 92% FT, the further power changes are being done with the movement of adjuster rods. The moderator is held in calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The shutdown of the reactor is effected by dumping the moderator water to dump tank by fast equalizing of helium gas pressure. In the revised mode of operation of moderator circuit after the moderator inlet manifold failure, the dump timing was observed to be more compared to the normal value. This was investigated and observed to be due to accumulation of D 2 O in the gas space above dump valves, which was affecting the helium equalizing flow. Also some of Indicating Alarm Meters (IAM) in protective system initiating the trip signals have failed in the unsafe mode. They have been modified to avoid the recurrence of the failures. (author)

  18. Study to use graded cobalt adjuster in 540 MWe PHWR

    International Nuclear Information System (INIS)

    Raj, Manish; Fernando, M.P.S.; Pradhan, A.S.; Kumar, A.N.

    2007-01-01

    Full text: There are 17 adjusters in 540 MWe PHWR, which are essentially provided for xenon override function. They also provide flux flattening being in the central region of the reactor core. The present design of adjusters consists of stainless steel tube. The adjuster rods are grouped into 8 banks for movement. Since adjusters are normally fully inserted during reactor operation, they are best suited for production of cobalt 60. The nickel-plated cobalt in the form of either slugs or pellet are used for the design of cobalt pencils. The number of pencils can be varied to optimize the reactivity load and cobalt 60 production requirement. The worth and activity of cobalt adjusters have been worked out considering different pin configuration for the adjuster assembly. To start with we have assumed all adjusters throughout its length are of the same configuration. The flux depression factors within the cobalt pencils have been considered in the estimations of the specific and total cobalt 60 activities. The option of using graded cobalt adjusters, where different pin configuration along the length is considered for better flux flattening

  19. Considerations in providing purification flows for 500 MWe PHWR primary circuits

    International Nuclear Information System (INIS)

    Sharma, A.K.; Goswami, S.; Bapat, C.N.; Sharma, V.K.

    1995-01-01

    The purpose of the purification system is to keep the primary heat transport (PHT) system clean by removing traces of impurities arising due to corrosion of the carbon steel pipes and heat transfer surfaces and erosion/corrosion of valve trims, pipes and mechanical seals or due to presence of soluble or insoluble fission products. These impurities are undesirable because they are usually radioactive, either naturally or through activation by the neutron flux as they are carried by the coolant through the reactor core. The purification system minimizes the probability of generation of radioactive impurities by controlling the chemistry of PHT coolant so that corrosion is minimum. Various considerations for providing the requisite purification flow to fulfill the above functions for a typical 500 MWe PHWR are presented. (author). 4 refs., 2 tabs., 2 figs

  20. Derivatization Ion Chromatography for the Determination of Monoethanolamine in Presence of Hydrazine in PHWR Steam-Water Circuits

    Directory of Open Access Journals (Sweden)

    Ayushi D.

    2011-01-01

    Full Text Available A simple, rapid and accurate method for the determination of monoethanolamine (MEA in PHWR steam-water circuits has been developed. MEA is added in the feed water to provide protection against corrosion while hydrazine is added to scavenge dissolved oxygen. The quantitative determination of MEA in presence of hydrazine was accomplished using derivatization ion chromatography with conductometric detection in nonsuppressed mode. A Metrosep cation 1-2 analytical column and a Metrosep cartridge were used for cation separation. A mixture of 4 mM tartaric acid, 20% acetone and 0.05 mM HNO3 was used as eluent. Acetone in the mobile phase leads to the formation of different derivatives with MEA and hydrazine. The interferences due Na+ and NH4 + were eliminated by adopting a simple pretreatment procedure employing OnGuard-H cartridge. The limit of detection limit of MEA was 0.1 μg mL−1 and the relative standard deviation was 2% for the overall method. The recovery of MEA added was in the range 95%–102%. The method was applied to the determination of MEA in steam generator water samples.

  1. Supercritical Water Reactors

    International Nuclear Information System (INIS)

    Bouchter, J.C.; Dufour, P.; Guidez, J.; Latge, C.; Renault, C.; Rimpault, G.

    2014-01-01

    The supercritical water reactor (SCWR) is one of the 6 concepts selected for the 4. generation of nuclear reactors. SCWR is a new concept, it is an attempt to optimize boiling water reactors by using the main advantages of supercritical water: only liquid phase and a high calorific capacity. The SCWR requires very high temperatures (over 375 C degrees) and very high pressures (over 22.1 MPa) to operate which allows a high conversion yield (44% instead of 33% for a PWR). Low volumes of coolant are necessary which makes the neutron spectrum shift towards higher energies and it is then possible to consider fast reactors operating with supercritical water. The main drawbacks of supercritical water is the necessity to use very high pressures which has important constraints on the reactor design, its physical properties (density, calorific capacity) that vary strongly with temperatures and pressures and its very high corrosiveness. The feasibility of the concept is not yet assured in terms of adequate materials that resist to corrosion, reactor stability, reactor safety, and reactor behaviour in accidental situations. (A.C.)

  2. Effect of Flow Configuration on Velocity and Temperature Distribution of Moderator Inside 540 MWe PHWR Calandria using CFD Techniques

    International Nuclear Information System (INIS)

    Bharj, J.S.; Sahaya, R.R.; Datta, D.; Dharne, S.P.

    2006-01-01

    The calandria of a Pressurized Heavy Water Reactor (PHWR) is a horizontal cylindrical vessel housing a matrix of horizontal tubes called calandria tubes, through which pass the pressure tubes that house the fuel bundles. The calandria is filled with heavy water acting as moderator. A large amount of heat (about 95 MW) is generated within the moderator mainly due to neutron slowing down and attenuation of gamma radiations. In the present configuration of 540 MWe calandria, moderator inlet diffusers are directed upwards and the outlet is from the bottom of the calandria. This configuration is not conducive for the buoyancy-dominated flows generated due to large volumetric heat generation in the moderator. In order to decide the effects of changes in flow configuration by changing location/direction of inlet/outlet nozzles, a study was done for moderator flows in the using PHOENICS CFD software. The results of study with various flow configurations show that modification in moderator flow configuration, reduces the peak temperature of moderator in calandria by about 12 deg C as well as gives a much more uniform temperature distribution. (authors)

  3. Status of advanced technology and design for water cooled reactors: Heavy water reactors

    International Nuclear Information System (INIS)

    1989-07-01

    In 1987 the IAEA established the International Working Group on Advanced Technologies for Water-Cooled Reactors (IWGATWR). Within the framework of the IWGATWR the IAEA Technical Report on Status of Advanced Technology and Design for Water Cooled Reactors, Part I: Light Water Reactors and Part II: Heavy Water Reactors, has been undertaken to document the major current activities and trends of technological improvement and development for future water reactors. Part I of the report dealing with Light Water Reactors (LWRs) was published in 1988 (IAEA-TECDOC-479). Part II of the report covers Heavy Water Reactors (HWRs) and has now been prepared. This report is based largely upon submissions from Member States. It has been supplemented by material from the presentations at the IAEA Technical Committee and Workshop on Progress in Heavy Water Reactor Design and Technology held in Montreal, Canada, December 6-9, 1988. It is hoped that this part of the report, containing the status of advanced heavy water reactor technology up to 1988 and ongoing development programmes will aid in disseminating information to Member States and in stimulating international cooperation. Refs, figs and tabs

  4. Development of an accident consequence assessment code for evaluating site suitability of light- and heavy-water reactors based on the Korean Technical standards

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Won Tae; Jeong, Hae Sung; Jeong, Hyo Joon; Kil, A Reum; Kim, Eun Han; Han, Moon Hee [Nuclear Environment Safety Research Division, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-12-15

    Methodologies for a series of radiological consequence assessments show a distinctive difference according to the design principles of the original nuclear suppliers and their technical standards to be imposed. This is due to the uncertainties of the accidental source term, radionuclide behavior in the environment, and subsequent radiological dose. Both types of PWR and PHWR are operated in Korea. However, technical standards for evaluating atmospheric dispersion have been enacted based on the U.S. NRC's positions regardless of the reactor types. For this reason, it might cause a controversy between the licensor and licensee of a nuclear power plant. It was modelled under the framework of the NRC Regulatory Guide 1.145 for light-water reactors, reflecting the features of heavy-water reactors as specified in the Canadian National Standard and the modelling features in MACCS2, such as atmospheric diffusion coefficient, ground deposition, surface roughness, radioactive plume depletion, and exposure from ground deposition. An integrated accident consequence assessment code, ACCESS (Accident Consequence Assessment Code for Evaluating Site Suitability), was developed by taking into account the unique regulatory positions for reactor types under the framework of the current Korean technical standards. Field tracer experiments and hand calculations have been carried out for validation and verification of the models. The modelling approaches of ACCESS and its features are introduced, and its applicative results for a hypothetical accidental scenario are comprehensively discussed. In an applicative study, the predicted results by the light-water reactor assessment model were higher than those by other models in terms of total doses.

  5. Role of research and development in life management programme and upgradation of safety of Indian Pressurised Heavy Water Reactors

    International Nuclear Information System (INIS)

    Rupani, B.B.; Vijayan, P.K.; Rama Rao, A.; Sinha, R.K.

    2009-01-01

    At present, India has a fleet of thirteen small size 220 MWe Pressurised Heavy Water Reactors (PHWRs) and two medium size 540 MWe PHWRs. Reactor Engineering Division (RED) of Bhabha Atomic Research Centre (BARC) has pursued multi-faceted Research and Development programmes to support each phase of PHWR i.e. design, construction, commissioning, operation, maintenance, In-Service Inspection, repair and replacement and life extension, This programme is mainly related to life management of coolant channels, development of tooling and techniques for In-service Inspection of coolant channels, development of repair and replacement technology for coolant channels and moderator system, In-house development of technology and equipments like rolled joints to joint dissimilar metals and lancing equipment for steam generator and state-of art diagnostic systems for trouble shooting critical operating systems. The strong R and D support provided in the programme has significantly contributed towards safe operation of PHWRs. This paper gives the highlights of the major activities in above areas with their end uses and capability. (author)

  6. Assessment of clad integrity of PHWR fuel pin following a postulated severe accident

    International Nuclear Information System (INIS)

    Dutta, B.K.; Kushwaha, H.S.; Venkat Raj, V.

    2000-01-01

    A mechanistic fuel performance analysis code FAIR has been developed. The code can analyse fuel pins with free standing as well as collapsible clad under normal, off-normal and accident conditions of reactors. The code FAIR is capable of analysing the effects of high burnup on fuel behaviour. The code incorporates finite element based thermo-mechanical module for computing transient temperature distribution and thermal-elastic-plastic stresses in the fuel pin. A number of high temperature thermo-physical and thermo-mechanical models also have been incorporated for analysing fuel pins subjected to severe accident scenario. The present paper describes salient features of code FAIR and assessment of clad integrity of PHWR fuel pins with different initial burnup subjected to severe accident scenario. (author)

  7. Reactor water spontaneous circulation structure in reactor pressure vessel

    International Nuclear Information System (INIS)

    Takahashi, Kazumi

    1998-01-01

    The gap between the inner wall of a reactor pressure vessel of a BWR type reactor and a reactor core shroud forms a down comer in which reactor water flows downwardly. A feedwater jacket to which feedwater at low temperature is supplied is disposed at the outer circumference of the pressure vessel just below a gas/water separator. The reactor water at the outer circumferential portion just below the air/water separator is cooled by the feedwater jacket, and the feedwater after cooling is supplied to the feedwater entrance disposed below the feedwater jacket by way of a feedwater introduction line to supply the feedwater to the lower portion of the down comer. This can cool the reactor water in the down comer to increase the reactor water density in the down comer thereby forming strong downward flows and promote the recycling of the reactor water as a whole. With such procedures, the reactor water can be recycled stably only by the difference of the specific gravity of the reactor water without using an internal pump. In addition, the increase of the height of the pressure vessel can be suppressed. (I.N.)

  8. Light water reactor safety

    CERN Document Server

    Pershagen, B

    2013-01-01

    This book describes the principles and practices of reactor safety as applied to the design, regulation and operation of light water reactors, combining a historical approach with an up-to-date account of the safety, technology and operating experience of both pressurized water reactors and boiling water reactors. The introductory chapters set out the basic facts upon which the safety of light water reactors depend. The central section is devoted to the methods and results of safety analysis. The accidents at Three Mile Island and Chernobyl are reviewed and their implications for light wate

  9. Reactor water level control device

    International Nuclear Information System (INIS)

    Hiramatsu, Yohei.

    1980-01-01

    Purpose: To increase the rapid response of the waterlevel control converting a reactor water level signal into a non-linear type, when the water level is near to a set value, to stabilize the water level reducting correlatively the reactor water level variation signal to stabilize greatly from the set value, and increasing the variation signal. Constitution: A main vapor flow quality transmitter detects the vapor flow generated in a reactor and introduced into a turbine. A feed water flow transmitter detects the quantity of a feed water flow from the turbine to the reactor, this detected value is sent to an addition operating apparatus. On the other hand, the power signal of the reactor water level transmitter is sent to the addition operating apparatus through a non-linear water level signal converter. The addition operation apparatus generates a signal for requesting the feed water flow quantity from both signals. Upon this occasion, the reactor water level signal converter makes small the reactor water level variation when the reactor level is close the set value, and when the water level deviates greatly from the set value, the reactor water level variation is made large thereby to improve the rapid response of the reactor coater level control. (Yoshino, Y.)

  10. Status of advanced technology and design for water cooled reactors: Light water reactors

    International Nuclear Information System (INIS)

    1988-10-01

    Water reactors represent a high level of performance and safety. They are mature technology and they will undoubtedly continue to be the main stream of nuclear power. There are substantial technological development programmes in Member States for further improving the technology and for the development of new concepts in water reactors. Therefore the establishment of an international forum for the exchange of information and stimulation of international co-operation in this field has emerged. In 1987 the IAEA established the International Working Group on Advanced Technologies for Water-Cooled Reactors (IWGATWR). Within the framework of IWGATWR the IAEA Technical Report on Status of Advanced Technology and Design for Water Cooled Reactors, Part I: Light Water Reactors and Part II: Heavy Water Reactors has been undertaken to document the major current activities and different trends of technological improvements and developments for future water reactors. Part I of the report dealing with LWRs has now been prepared and is based mainly on submissions from Member States. It is hoped that this part of the report, containing the status of advanced light water reactor design and technology of the year 1987 and early 1988 will be useful for disseminating information to Agency Member States and for stimulating international cooperation in this subject area. 93 refs, figs and tabs

  11. Solubility of corrosion products in high temperature water

    International Nuclear Information System (INIS)

    Srinivasan, M.P.; Narasimhan, S.V.

    1995-01-01

    A short review of solubility of corrosion products at high temperature in either neutral or alkaline water as encountered in BWR, PHWR and PWR primary coolant reactor circuits is presented in this report. Based on the available literature, various experimental techniques involved in the study of the solubility, theory for fitting the solubility data to the thermodynamic model and discussion of the published results with a scope for future work have been brought out. (author). 17 refs., 7 figs

  12. Reactor water sampling device

    International Nuclear Information System (INIS)

    Sakamaki, Kazuo.

    1992-01-01

    The present invention concerns a reactor water sampling device for sampling reactor water in an in-core monitor (neutron measuring tube) housing in a BWR type reactor. The upper end portion of a drain pipe of the reactor water sampling device is attached detachably to an in-core monitor flange. A push-up rod is inserted in the drain pipe vertically movably. A sampling vessel and a vacuum pump are connected to the lower end of the drain pipe. A vacuum pump is operated to depressurize the inside of the device and move the push-up rod upwardly. Reactor water in the in-core monitor housing flows between the drain pipe and the push-up rod and flows into the sampling vessel. With such a constitution, reactor water in the in-core monitor housing can be sampled rapidly with neither opening the lid of the reactor pressure vessel nor being in contact with air. Accordingly, operator's exposure dose can be reduced. (I.N.)

  13. Process Control Logic Modification to Mitigate Transient Following Tripping of a Primary Circulating Pump for a 540 MWe PHWR Power Plant

    International Nuclear Information System (INIS)

    Contractor, Ankur D; Gaikwad, Avinash J.; Kumar, Rajesh; Chakraborty, G.; Vhora, S.F.

    2006-01-01

    The 540 MWe Indian Pressurised Heavy Water Reactor (PHWR) incorporates many new features as compared to the earlier 220 MWe PHWRs. To evaluate the new design features like Primary Heat Transport (PHT) system configuration with two loops, four Primary Circulating Pumps (PCPs) and four passes through core, addition of a Pressurizer (surge Tank) in the PHT system along with Feed/Bleed system and their safety related implications, simulation model have been developed. A reactor step-back is proposed following one PCP trip. The corresponding PCP in the healthy loop is tripped to avoid asymmetrical flow and pressure distribution in the two identical loops. In spite of such elaborate provisions, the margins from high/low PHT pressure are small following tripping of one PCP. Mathematical models for all the major components and sub-systems of the proposed 540 MWe PHWR were developed based on the conservation equations of mass, momentum, energy and equation of state. All the associated control systems are also modeled. The PHT system includes the reactor core with nuclear fuel, PCP, PHT system pressure controller with feed/bleed system and Pressurizer (Surge Tank). The secondary system includes mainly the Steam Generators (SGs), the SG level and pressure controllers, apart from the various steam cycle components. All these models are integrated together to form the Plant Transient Analysis Computer Code Dyna540. The scenario following one PCP trips leads to different states (high/low pressure in Reactor Outlet Header (ROH)) depending upon the banks in which the PCP trips. The pressurizer is connected to two ROHs on one side of the reactor. The system pressure is controlled based on average of four ROHs pressure. In the case of asymmetrical pump operation, this logic leads to a situation where individual ROH pressure goes very near the low/high PHT system pressure trip set point, even though the controlled average pressure is very close to the set pressure. The PHT high

  14. Delayed hydride cracking behavior of Zr-2.5Nb alloy pressure tubes for PHWR700

    Energy Technology Data Exchange (ETDEWEB)

    Sunil, S.; Bind, A.K.; Khandelwal, H.K.; Singh, R.N., E-mail: rnsingh@barc.gov.in; Chakravartty, J.K.

    2015-11-15

    In order to attain improved in-reactor performance few prototypes pressure tubes of Zr-2.5Nb alloy were manufactured by employing forging to break the cast structure and to obtain more homogeneous microstructure. Both double forging and single forging were employed. The forged material was further processed by employing hot extrusion, cold pilgering and autoclaving. A detailed characterization in terms of mechanical properties and microstructure of the prototype tubes were carried for qualifying it for intended use as pressure tubes in PHWR700 reactors. In this work, Delayed Hydride Cracking (DHC) behavior of the forged Zr-2.5Nb pressure tube material characterized in terms of DHC velocity and threshold stress intensity factor associated with DHC (K{sub IH}) was compared with that of conventionally manufactured material in the temperature range of 200–283 °C. Activation energy associated with the DHC in this alloy was found to be ∼60 kJ/mol for the forged materials.

  15. A series of lectures on operational physics of power reactors

    International Nuclear Information System (INIS)

    Mohanakrishnan, P.; Rastogi, B.P.

    1982-01-01

    This report discusses certain aspects of operational physics of power reactors. These form a lecture series at the Winter College on Nuclear Physics and Reactors, Jan. - March 1980, conducted at the International Centre for Theoretical Physics, Trieste, Italy. The topics covered are (a) the reactor physics aspects of fuel burnup (b) theoretical methods applied for burnup prediction in power reactors (c) interpretation of neutron detector readings in terms of adjacent fuel assembly powers (d) refuelling schemes used in power reactors. The reactor types chosen for the discussion are BWR, PWR and PHWR. (author)

  16. Reactor water clean-up device

    International Nuclear Information System (INIS)

    Tanaka, Koji; Egashira, Yasuo; Shimada, Fumie; Igarashi, Noboru.

    1983-01-01

    Purpose: To save a low temperature reactor water clean-up system indispensable so far and significantly simplify the system by carrying out the reactor water clean-up solely in a high temperature reactor water clean-up system. Constitution: The reactor water clean-up device comprises a high temperature clean-up pump and a high temperature adsorption device for inorganic adsorbents. The high temperature adsorption device is filled with amphoteric ion adsorbing inorganic adsorbents, or amphoteric ion adsorbing inorganic adsorbents and anionic adsorbing inorganic adsorbents. The reactor water clean-up device introduces reactor water by the high temperature clean-up pump through a recycling system to the high temperature adsorption device for inorganic adsorbents. Since cations such as cobalt ions and anions such as chlorine ions in the reactor water are simultaneously removed in the device, a low temperature reactor water clean-up system which has been indispensable so far can be saved to realize the significant simplification for the entire system. (Seki, T.)

  17. Economic and safety aspects of using moderator heat for feed water heating in a nuclear power plant

    International Nuclear Information System (INIS)

    Patwegar, I.A.; Dutta, Anu; Chaki, S.K.; Venkat Raj, V.

    2002-01-01

    Full text: In the proposed advanced heavy water reactor (AHWR), coolant and moderator are separated by the coolant channel. The coolant absorbs most of the fission heat produced in the reactor core. However, the moderator absorbs about 5 to 6 % of the fission heat. In a reactor producing 750 MW(th) power, this moderator heat is about 40 MW. In the present Indian PHWR (pressurized heavy water reactor) systems, this moderator heat is lost to a sink through the moderator heat exchangers, which are cooled by process water. This paper presents the results of the steam cycle analysis carried out for AHWR using moderator heat exchangers as part of the feed heating system. The present study is an attempt to determine the gain in electrical output (MW) if moderator heat is utilized for feed water heating. The operational and safety aspects of using moderator heat are also discussed in the paper

  18. Advanced light-water reactors

    International Nuclear Information System (INIS)

    Golay, M.W.; Todreas, N.E.

    1990-01-01

    Environmental concerns, economics and the earth's finite store of fossil fuels argue for a resuscitation of nuclear power. The authors think improved light-water reactors incorporating passive safety features can be both safe and profitable, but only if attention is paid to economics, effective management and rigorous training methods. The experience of nearly four decades has winnowed out designs for four basic types of reactor: the heavy-water reactor (HWR), the gas-cooled rector (GCR), the liquid-metal-cooled reactor (LMR) and the light-water reactor (LWR). Each design is briefly described before the paper discusses the passive safety features of the AP-600 rector, so-called because it employs an advanced pressurized water design and generates 600 MW of power

  19. Modeling of PHWR fuel elements using FUDA code

    International Nuclear Information System (INIS)

    Tripathi, Rahul Mani; Soni, Rakesh; Prasad, P.N.; Pandarinathan, P.R.

    2008-01-01

    The computer code FUDA (Fuel Design Analysis) is used for modeling PHWR fuel bundle operation history and carry out fuel element thermo-mechanical analysis. The radial temperature profile across fuel and sheath, fission gas release, internal gas pressure, sheath stress and strains during the life of fuel bundle are estimated

  20. Reactor water level control device

    International Nuclear Information System (INIS)

    Utagawa, Kazuyuki.

    1993-01-01

    A device of the present invention can effectively control fluctuation of a reactor water level upon power change by reactor core flow rate control operation. That is, (1) a feedback control section calculates a feedwater flow rate control amount based on a deviation between a set value of a reactor water level and a reactor water level signal. (2) a feed forward control section forecasts steam flow rate change based on a reactor core flow rate signal or a signal determining the reactor core flow rate, to calculate a feedwater flow rate control amount which off sets the steam flow rate change. Then, the sum of the output signal from the process (1) and the output signal from the process (2) is determined as a final feedwater flow rate control signal. With such procedures, it is possible to forecast the steam flow rate change accompanying the reactor core flow rate control operation, thereby enabling to conduct preceding feedwater flow rate control operation which off sets the reactor water level fluctuation based on the steam flow rate change. Further, a reactor water level deviated from the forecast can be controlled by feedback control. Accordingly, reactor water level fluctuation upon power exchange due to the reactor core flow rate control operation can rapidly be suppressed. (I.S.)

  1. Report of the COG/IAEA international workshop on managing nuclear safety at CANDU (PHWR) plants. Working material

    International Nuclear Information System (INIS)

    1997-01-01

    The workshop, hosted by COG and co-sponsored by the International Atomic Energy Agency (IAEA, Vienna) was held in Toronto, April 28 - May 1st, 1997. The 40 participants included senior managers from IAEA member countries operating or constructing CANDU (PHWR) stations. All the offshore utilities with PHWR stations in Korea, Romania, India, Argentina, Pakistan, and China were present with their domestic counterparts from Ontario Hydro Nuclear, Hydro Quebec, New Brunswick Power, and AECL. The objectives of the workshop were to: provide a forum for exchange of ideas among nuclear safety managers operating CANDU (PHWR) stations and to learn from each other's experiences; to foster sharing of information on different operating approaches to managing safety and, in particular, to highlight the strategies for controlling the overall plant risk to a low level; to identify and discuss issues of mutual interest pertinent to PHWR stations and to define future follow-up activities. Refs, figs

  2. Report of the COG/IAEA international workshop on managing nuclear safety at CANDU (PHWR) plants. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The workshop, hosted by COG and co-sponsored by the International Atomic Energy Agency (IAEA, Vienna) was held in Toronto, April 28 - May 1st, 1997. The 40 participants included senior managers from IAEA member countries operating or constructing CANDU (PHWR) stations. All the offshore utilities with PHWR stations in Korea, Romania, India, Argentina, Pakistan, and China were present with their domestic counterparts from Ontario Hydro Nuclear, Hydro Quebec, New Brunswick Power, and AECL. The objectives of the workshop were to: provide a forum for exchange of ideas among nuclear safety managers operating CANDU (PHWR) stations and to learn from each other`s experiences; to foster sharing of information on different operating approaches to managing safety and, in particular, to highlight the strategies for controlling the overall plant risk to a low level; to identify and discuss issues of mutual interest pertinent to PHWR stations and to define future follow-up activities. Refs, figs.

  3. Investigation of fluid flow in various geometries related to nuclear reactor using PIV system

    International Nuclear Information System (INIS)

    Kansal, A.K.; Maheshwari, N.K.; Singh, R.K.; Vijayan, P.K.; Saha, D.; Singh, R.K.; Joshi, V.M.

    2011-01-01

    Particle Image Velocimetry (PIV) is a non-intrusive technique for simultaneously measuring the velocities at many points in a fluid flow. The PIV system used is comprised of Nd:YAG laser source, CCD (Charged Coupled Device) camera, timing controller (to control the laser and camera) and software used for analyzing the flow velocities. Several case studies related to nuclear reactor were performed with the PIV system. Some of the cases like flow in circular tube, submerged jet, natural convection in a water pool, flow field of moderator inlet diffuser of 500 MWe Pressurised Heavy Water Reactor (PHWR) and fluidic flow control device (FFCD) used in advanced accumulator of Emergency Core Cooling System (ECCS) have been studied using PIV system. Theoretical studies have been performed and comparisons with PIV results are also given in the present studies. (author)

  4. Design, development and deployment of special sealing plug for 540 MWe PHWRs

    International Nuclear Information System (INIS)

    Sharma, G.; Roy, S.; Patel, R.J.

    2012-01-01

    The coolant channel in Pressurized Heavy Water Reactors is a pressure boundary component and is very important for reactor performance and reactor safety. Monitoring the condition of the pressure tube of each coolant channel on a periodic basis is very important. In-Service Inspection (ISI) of the coolant channels in water filled condition is done regularly for 220 MWe PHWR. For the same purpose BARC Channel Inspection System is developed for 540 MWe PHWR also. Special Sealing Plug has been developed to facilitate the channel inspection (in water filled condition) with all necessary safety features at par with normal sealing plug. Special Sealing Plug provides a 50 mm through hole for passage of drive tube of Inspection Head maintaining integrity of PHT. Lot of challenges were faced for developing the Special Sealing Plug and its associated tools. It was a first of its kind design. First ISI of TAPS-4 was conducted successfully using this plug along with associated tools in November 2011. This development has provided immense help to NPCIL in life management of 540 MWe PHWR coolant channels. (author)

  5. Next generation light water reactors

    International Nuclear Information System (INIS)

    Omoto, Akira

    1992-01-01

    In the countries where the new order of nuclear reactors has ceased, the development of the light water reactors of new type has been discussed, aiming at the revival of nuclear power. Also in Japan, since it is expected that light water reactors continue to be the main power reactor for long period, the technology of light water reactors of next generation has been discussed. For the development of nuclear power, extremely long lead time is required. The light water reactors of next generation now in consideration will continue to be operated till the middle of the next century, therefore, they must take in advance sufficiently the needs of the age. The improvement of the way men and the facilities should be, the simple design, the flexibility to the trend of fuel cycle and so on are required for the light water reactors of next generation. The trend of the development of next generation light water reactors is discussed. The construction of an ABWR was started in September, 1991, as No. 6 plant in Kashiwazaki Kariwa Power Station. (K.I.)

  6. Sizing of ion exchange column for PHT purification system of 500 MWe Indian PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Goswami, S; Sharma, A K; Bapat, C N; Sharma, V K [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Strict chemistry control is required on the heavy water coolant in the primary loop of the PHWR to ensure stability of oxide corrosion film and to prevent corrosion build up on the surfaces. This is achieved by maintaining PD value of PHT coolant at about 10.45 and sp. conductivity between 20 to 40 mhos/cm by ion exchange column and filtration of coolant. This paper deals with the sizing and selection of bed height of ninth column from different methods. (author). 7 refs., 6 figs.

  7. Utilization of noise analysis technique for mechanical vibrations estimation in the ATUCHA{sub 1} and Embalse Argentine NPP; Uso de la tecnica de analisis de ruido para la estimacion de vibraciones mecanicas en las centrales nucleares argentinas Atucha I y Embalse

    Energy Technology Data Exchange (ETDEWEB)

    Lescano, V.H.; Wentzeis, L.M. [Comision Nacional de Energia Atomica, Buenos Aires (Argentina). Centro Atomico Constituyentes; Guevara, M.; Moreno, C. [Nucleoelectrica Argentina S.A., Cordoba (Argentina). Central Nuclear Embalse; Pineyro, J. [Nucleoelectrica Argentina S.A., Buenos Aires (Argentina). Central Nuclear Atucha I

    1996-07-01

    In Argentine, comprehensive noise measurements have been performed with the reactor instrumentation of the PHWR power plant Atucha I and Embalse. The Embalse reactor is a CANDU-600 (600 Mwe) type pressurized heavy water reactor. It's a heavy water moderator and heavy water cooled natural uranium fueled pressure tube system. Signal of vanadium and platinum type in core-self power neutron detectors of ex-core ion chambers and of a moderator pressure sensor have been recorded and analysed. The vibration of reactor internals as vertical and horizontal in-core neutron flux detectors units and the coolant channels systems, consisting of calandria and pressure tubes with fuel bundles, have been identified and monitored during normal reactor operation. Atucha I, is a PHWR reactor natural uranium fueled, and heavy water moderated and cooled. Neutron noise techniques using of ex-core ionization chambers and in-core Vanadium SPND's were implemented, among others, in order to produce early detection of anomalous vibrations in the reactor internals. Noise analysis was successfully performed to identify normal and peculiar vibrations in particular reactor internals. (author)

  8. Utilization of noise analysis technique for mechanical vibrations estimation in the ATUCHA1 and Embalse Argentine NPP

    International Nuclear Information System (INIS)

    Lescano, V.H.; Wentzeis, L.M.; Guevara, M.; Moreno, C.; Pineyro, J.

    1996-01-01

    In Argentine, comprehensive noise measurements have been performed with the reactor instrumentation of the PHWR power plant Atucha I and Embalse. The Embalse reactor is a CANDU-600 (600 Mwe) type pressurized heavy water reactor. It's a heavy water moderator and heavy water cooled natural uranium fueled pressure tube system. Signal of vanadium and platinum type in core-self power neutron detectors of ex-core ion chambers and of a moderator pressure sensor have been recorded and analysed. The vibration of reactor internals as vertical and horizontal in-core neutron flux detectors units and the coolant channels systems, consisting of calandria and pressure tubes with fuel bundles, have been identified and monitored during normal reactor operation. Atucha I, is a PHWR reactor natural uranium fueled, and heavy water moderated and cooled. Neutron noise techniques using of ex-core ionization chambers and in-core Vanadium SPND's were implemented, among others, in order to produce early detection of anomalous vibrations in the reactor internals. Noise analysis was successfully performed to identify normal and peculiar vibrations in particular reactor internals. (author)

  9. Super critical water reactors

    International Nuclear Information System (INIS)

    Dumaz, P.; Antoni, O; Arnoux, P.; Bergeron, A; Renault, C.; Rimpault, G.

    2005-01-01

    Water is used as a calori-porter and moderator in the most major nuclear centers which are actually in function. In the pressurized water reactor (PWR) and boiling water reactor (BWR), water is maintained under critical point of water (21 bar, 374 Centigrade) which limits the efficiency of thermodynamic cycle of energy conversion (yield gain of about 33%) Crossing the critical point, one can then use s upercritical water , the obtained pressure and temperature allow a significant yield gains. In addition, the supercritical water offers important properties. Particularly there is no more possible coexistence between vapor and liquid. Therefore, we don't have more boiling problem, one of the phenomena which limits the specific power of PWR and BWR. Since 1950s, the reactor of supercritical water was the subject of studies more or less detailed but neglected. From the early 1990s, this type of conception benefits of some additional interests. Therefore, in the international term G eneration IV , the supercritical water reactors had been considered as one of the big options for study as Generation IV reactors. In the CEA, an active city has engaged from 1930 with the participation to a European program: The HPWR (High Performance Light Water Reactor). In this contest, the R and D studies are focused on the fields of neutrons, thermodynamic and materials. The CEA intends to pursue a limited effort of R and D in this field, in the framework of international cooperation, preferring the study of versions of rapid spectrum. (author)

  10. Nuclear power programme: development and prospects

    International Nuclear Information System (INIS)

    Prasad, Y.S.R.

    1997-01-01

    The relevance of nuclear power in meeting the short and long term energy needs of India was recognised right at the beginning of the atomic energy programme. From the very beginning, as a long term strategy, the nuclear power programme, formulated by Dr Homi Jehangir Bhabha, embarked on a three stage process linking the fuel cycles of Pressurised Heavy Water Reactor (PHWR) and Fast Breeder Reactor (FBR), and was planned for judicious utilisation of the country's limited uranium ore (78,000 tonne) but vast thorium resources (>360,000 tonne). The emphasis of the programme was on self-reliance and thorium utilisation as a long term objective. India selected Pressurised Heavy Water Reactor (PHWR) because of several inherent advantages. (author)

  11. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  12. A three-dimensional analyses of fluid flow and heat transfer for moderator integrity assessment in PHWR

    International Nuclear Information System (INIS)

    Bang, K. H.; Lee, J. Y.; Yoo, S. O.; Kim, M. W.; Kim, H. J.

    2002-01-01

    Three-dimensional analyses of fluid flow and heat transfer has been performed in this study. The simulation of SPEL experimental work and comparison with experimental data has been carried out to verify the analyses models. Moreover, to verify the CANDU-6 reactor type, analyses of fluid flow and heat transfer in the calandria under the condition of steady state has been performed using FLUENT code, which is the conventional code for a three-dimensional analyses of fluid flow and heat transfer for moderator integrity assessment in PHWR thermal-hydraulics. It is found that the maximum temperature in the moderator is 347K (74 ), so that the moderator has the enough subcoolability to ensure the integrity of pressure tube during LOCA conditions

  13. Water treatment process for nuclear reactors

    International Nuclear Information System (INIS)

    Marwan, M.A.; Khattab, M.S.; Hanna, A.N.

    1992-01-01

    Water treatment for purification is very important in reactor cooling systems as well as in many industrial applications. Since impurities in water are main source of problems, it is necessary to achieve and maintain high purity of water before utilization in reactor cooling systems. The present work investigate water treatment process for nuclear reactor utilization. Analysis of output water chemistry proved that demineralizing process is an appropriate method. Extensive experiments were conducted to determine economical concentration of the regenerates to obtain the optimum quantity of pure water which reached to 15 cubic meter instead of 10 cubic-meter per regeneration. Running cost is consequently decreased by about 30 %. output water chemistry agree with the recommended specifications for reactor utilization. The radionuclides produced in the primary cooling water due to reactor operation are determined. It is found that 70% of radioactive contaminants are retained by purification through resin of reactor filter. Decontamination factor and filter efficiency are also determined.5 fig., 3 tab

  14. BWR [boiling-water reactor] and PWR [pressurized-water reactor] off-normal event descriptions

    International Nuclear Information System (INIS)

    1987-11-01

    This document chronicles a total of 87 reactor event descriptions for use by operator licensing examiners in the construction of simulator scenarios. Events are organized into four categories: (1) boiling-water reactor abnormal events; (2) boiling-water reactor emergency events; (3) pressurized-water reactor abnormal events; and (4) pressurized-water reactor emergency events. Each event described includes a cover sheet and a progression of operator actions flow chart. The cover sheet contains the following general information: initial plant state, sequence initiator, important plant parameters, major plant systems affected, tolerance ranges, final plant state, and competencies tested. The progression of operator actions flow chart depicts, in a flow chart manner, the representative sequence(s) of expected immediate and subsequent candidate actions, including communications, that can be observed during the event. These descriptions are intended to provide examiners with a reliable, performance-based source of information from which to design simulator scenarios that will provide a valid test of the candidates' ability to safely and competently perform all licensed duties and responsibilities

  15. Reactor water chemistry control

    International Nuclear Information System (INIS)

    Kundu, A.K.

    2010-01-01

    Tarapur Atomic Power Station - 1 and 2 (TAPS) is a twin unit Boiling Water Reactors (BWRs) built in 1960's and operating presently at 160MWe. TAPS -1 and 2 are one of the vintage reactors operating in the world and belongs to earlier generation of BWRs has completed 40 years of successful, commercial and safe operation. In 1980s, both the reactors were de-rated from 660MWth to 530MWth due to leaks in the Secondary Steam Generators (SSGs). In BWR the feed water acts as the primary coolant which dissipates the fission heat and thermalises the fast neutrons generated in the core due to nuclear fission reaction and under goes boiling in the Reactor Pressure Vessel (RPV) to produce steam. Under the high reactor temperature and pressure, RPV and the primary system materials are highly susceptible to corrosion. In order to avoid local concentration of the chemicals in the RPV of BWR, chemical additives are not recommended for corrosion prevention of the system materials. So to prevent corrosion of the RPV and the primary system materials, corrosion resistant materials like stainless steel (of grade SS304, SS304L and SS316LN) is used as the structural material for most of the primary system components. In case of feed water system, main pipe lines are of carbon steel and the heater shell materials are of carbon steel lined with SS whereas the feed water heater tubes are of SS-304. In addition to the choice of materials, another equally important factor for corrosion prevention and corrosion mitigation of the system materials is maintaining highly pure water quality and strict water chemistry regime for both the feed water and the primary coolant, during operation and shutdown of the reactor. This also helps in controlled migration of corrosion product to and from the reactor core and to reduce radiation field build up across the primary system materials. Experience in this field over four decades added to the incorporation of modern techniques in detection of low

  16. Water treatment process for nuclear reactors

    International Nuclear Information System (INIS)

    Marwan, M.A.; Khattab, M.S.; Hanna, A.N.

    1993-01-01

    Water treatment for purification is very important in reactor cooling systems as well as in many industrial applications. Since impurities in water are main source of problems, it is necessary to achieve and maintain high purity of water before utilization in reactor cooling systems. The present work investigates water treatment process for nuclear reactor utilization. Analysis of outwater chemistry proved that demineralizing process is an appropriate method. Extensive experiments were conducted to determine economical concentration of the regenerants to obtain the optimum quantity of pure water which reached to 15 cubic-meter instead of 10 cubic-meter per regeneration. Running cost is consequently decreased by about 30%. Output water chemistry agrees with the recommended specifications for reactor utilization. The radionuclides produced in the primary cooling water due to reactor operation are determined. It is found that 70% of radioactive contaminants are retained by purification through resin of reactor filter. Decontamination factor and filter efficiency are also determined

  17. Development of innovative inspection tools for higher reliability of PHWR fuel

    International Nuclear Information System (INIS)

    Kamalesh Kumar, B.; Viswanathan, B.; Laxminarayana, B.; Ganguly, C.

    2003-01-01

    'Full text:' Advent of Computer aided manufacturing systems has led to very high rate of production with greater reliability. The conventional inspection tools and systems, which are often manual based do not complement with output of highly automated production line. In order to overcome the deficiency, a strategic plan was developed for having automated inspection facility for PHWR fuel assembly line. Laser based systems with their inherently high accuracy and quick response times are a favorite for metrology purpose. Non-contact nature of laser-based measurement ensures minimal contamination, low wear and tear and good repeatability. So far two laser-based systems viz. Pellet density measurement systems and triangulation sensors have been developed. Laser based fuel pellet inspection system and PHWR fuel bundle metric station are under development. Machine vision-based systems have been developed to overcome certain limitations when inspection has to be carried out on such a large scale manually. These deficiencies arise from limitations of resolution, accessibility, fatigue and absence of quantification ability. These problems get further compounded in inspection of fuel components because of their relatively small sizes, close tolerances required and the reflective surfaces. PC based vision system has been developed for inspecting components and fuel assemblies. The paper would touch upon the details of the various laser systems and vision systems that have been indigenously developed for PHWR Fuel Metrology and their impact on the assembly production line. (author)

  18. A study for the domestic application plan of the Generic Safety Issue(GSI) for the Pressurized Heavy Water Reactor

    International Nuclear Information System (INIS)

    Lee, Un Chul; Jang, Jin Wook; Lee, Sang Kyung; Lee, Doo Yong; Park, Chang Hwan

    2002-03-01

    In this study, a base work to construct the database of the domestic and foreign GSls were done through performing the deviation of GSls for the PHWR by investigating the development trend of international joint studies and the GSls of 4 countries as the PHWR state and examined the IAEA acceptance of GSls classification for the GSls of Canada, Korea Republic of, Argentina and India. We evaluated the possibility of application of the safety Issue for PHWR by investigating causes, contents and follow-up measures of each items. To evaluate the domestic application validity of the safety issue, We made the investigation matrix for the safety issue of each countries and also are reflecting new results in investigation matrix by examining IAEA PHWR GSI development trend. We intended to derive the GSls which are most appropriate in our PHWR by examining every issues. the derived GSls are divided into the design parts and the operation parts. And they have to be solved as soon as possible

  19. A study for the domestic application plan of the Generic Safety Issue(GSI) for the Pressurized Heavy Water Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Un Chul; Jang, Jin Wook; Lee, Sang Kyung; Lee, Doo Yong; Park, Chang Hwan [Seoul National Univ., Seoul (Korea, Republic of)

    2002-03-15

    In this study, a base work to construct the database of the domestic and foreign GSls were done through performing the deviation of GSls for the PHWR by investigating the development trend of international joint studies and the GSls of 4 countries as the PHWR state and examined the IAEA acceptance of GSls classification for the GSls of Canada, Korea Republic of, Argentina and India. We evaluated the possibility of application of the safety Issue for PHWR by investigating causes, contents and follow-up measures of each items. To evaluate the domestic application validity of the safety issue, We made the investigation matrix for the safety issue of each countries and also are reflecting new results in investigation matrix by examining IAEA PHWR GSI development trend. We intended to derive the GSls which are most appropriate in our PHWR by examining every issues. the derived GSls are divided into the design parts and the operation parts. And they have to be solved as soon as possible.

  20. MATLAB/SIMULINK model of CANDU reactor for control studies

    International Nuclear Information System (INIS)

    Javidnia, H.; Jiang, J.

    2006-01-01

    In this paper a MATLAB/SIMULINK model is developed for a CANDU type reactor. The data for the reactor are taken from an Indian PHWR, which is very similar to CANDU in its design. Among the different feedback mechanisms in the core of the reactor, only xenon has been considered which plays an important role in spatial oscillations. The model is verified under closed loop scenarios with simple PI controller. The results of the simulation show that this model can be used for controller design and simulation of the reactor systems. Adding models of the other components of a CANDU reactor would ultimately result in a complete model of CANDU plant in MATLAB/SIMULINK. (author)

  1. Light-water nuclear reactors

    International Nuclear Information System (INIS)

    Drevon, G.

    1983-01-01

    This work gives basic information on light-water reactors which is advanced enough for the reader to become familiar with the essential objectives and aspects of their design, their operation and their insertion in the industrial, economic and human environment. In view of the capital role of electric energy in the modern economy a significant place is given to electron-nuclear power stations, particularly those of the type adopted for the French programme. The work includes sixteen chapters. The first chapter relates the history and presents the various applications of light water reactors. The second refers to the general elementary knowledge of reactor physics. The third chapter deals with the high power light-water nuclear power station and thereby introduces the ensuing chapters which, up to and including chapter 13, are devoted to the components and the various aspects of the operation of power stations, in particular safety and the relationship with the environment. Chapter 14 provides information on the reactors adapted to applications other than the generation of electricity on an industrial scale. Chapter 15 shows the extent of the industrial effort devoted to light-water reactors and chapter 16 indicates the paths along which the present work is preparing the future of these reactors. The various chapters have been written to allow for separate consultation. An index of the main technical terms and a bibliography complete the work [fr

  2. Supercritical-pressure light water cooled reactors

    CERN Document Server

    Oka, Yoshiaki

    2014-01-01

    This book focuses on the latest reactor concepts, single pass core and experimental findings in thermal hydraulics, materials, corrosion, and water chemistry. It highlights research on supercritical-pressure light water cooled reactors (SCWRs), one of the Generation IV reactors that are studied around the world. This book includes cladding material development and experimental findings on heat transfer, corrosion and water chemistry. The work presented here will help readers to understand the fundamental elements of reactor design and analysis methods, thermal hydraulics, materials and water

  3. Composition and concentration of soluble and particulate matter in the coolant of the reactor primary cooling system of the Embalse nuclear power plant

    International Nuclear Information System (INIS)

    Chocron, Mauricio; Garcia Rodenas, Luis; La Gamma, Ana M.; Villegas, Marina; Fernandez, Alberto N.; Allemandi, Walter; Manera, Raul; Rosales, Hugo

    2000-01-01

    Nuclear power plants type PWR and PHWR (pressurized water reactor and pressurized heavy water reactor) have three coolant circuits which only exchange energy among them. The primary circuit, whose coolant extracts the reactor energy, the secondary circuit or water-steam cycle and the tertiary circuit which could be lake, river or sea water. The chemistry of the primary and secondary coolants is carefully controlled with the aim of minimizing the corrosion of structural materials. However, very low rates of corrosion are inevitable and one of the consequences of the corrosion processes is the presence of soluble and particulate matter in the coolant from where several problems associated with mass transfer arisen. In this way radioactive nuclides are transported out of the core to the steam generators, hydraulic resistance increases and heat transfer capability degrades. In the present paper some alternative techniques are proposed for the quantification of both, the particulate and soluble matter present in the coolant and their correspondent composition. Some results are also included and discussed. (author)

  4. On the feasibility of a CANDU PHWR actinide burner

    International Nuclear Information System (INIS)

    Anton, V.

    1995-01-01

    In this work a review of the current solutions to burn the actinide i.e. the spallation method, LWR, FBR, Siemens proposal and inert matrix is presented. Finally, a proposal is made to use the CANDU PHWR for this purpose, taking into account the techniques envisaged for LWR and the prospect of the advanced fuel cycle in CANDU system. (Author) 5 Refs

  5. Considerations in selecting tubing materials for CANDU steam generators

    International Nuclear Information System (INIS)

    Hemmings, R.L.

    1978-01-01

    Corrosion resistance is the major consideration in selecting tubing material for CANDU steam generators. Corrosion, and additional considerations, lead to the following steam generator tubing material recommendations: for CANDU-BPHWR's (boiling pressurized heavy water reactors) low-cobalt Incoloy-800; for CANDU-PHWR's (pressurized, non-boiling, heavy water reactors), low-cobalt Monel-400

  6. Safety aspects of water chemistry in light water reactors

    International Nuclear Information System (INIS)

    1988-12-01

    The goals of the water chemistry control programmes are to maximize operational safety and the availability and operating life of primary system components, to maximize fuel integrity, and to control radiation buildup. To achieve these goals an effective corporate policy should be developed and implemented. Essential management responsibilities are: Recognizing of the long-term benefits of avoiding or minimizing: a) system corrosion; b) fuel failure; and c) radiation buildup. The following control or diagnostic parameters are suitable performance indicators: for PWR primary coolant circuits: pH of reactor water (by operating temperature); Concentration of chlorides in reactor water; Hydrogen (or oxygen) in reactor water. For PWR secondary coolant circuits: pH in feedwater; Cation productivity in steam generator blowdown; Iron concentration in feedwater; Oxygen concentration in condensate. And BWR coolant circuits: Conductivity of reactor water; Concentration of chlorides in reactor water; Iron concentration in feedwater; Copper concentration in feedwater. The present document represents a review of the developments in some Member States on how to implement a reasonable water chemistry programme and how to assess its effectiveness through numerical indicators. 12 figs, 20 tabs

  7. Feed water control device in a reactor

    International Nuclear Information System (INIS)

    Okutani, Tetsuro.

    1984-01-01

    Purpose: To prevent substantial fluctuations of the water level in a nuclear reactor and always keep a constant standard level under any operation condition. Constitution: When the causes for fluctuating the reactor water level is resulted, a certain amount of correction signal is added to a level deviation signal for the difference between the reactor standard level and the actual reactor water level to control the flow rate of the feed water pump depending on the addition signal. If reactor scram should occur, for instance, a level correction signal changing stepwise depending on a scram signal is outputted and added to the level deviation signal. As the result, the flow rate of feed water sent into the reactor just after the scram is increased, whereby the lowering in the reactor water level upon scram can be decreased as compared with the case where no such level compensation signal is inputted. (Kamimura, M.)

  8. ARGOS PHWR 380

    International Nuclear Information System (INIS)

    Gonzalez, A.J.; Vanzulli, R.C.

    1987-01-01

    This paper introduces the design of a nuclear power plant of 380 MWe, equipped with a preassure-vessel heavy-water reactor. An explanation is given of the technical, economical and financial factors that led to the design of this medium sized nuclear power plant, which is compatible with the latest advances in the field of nuclear safety. (Author) [es

  9. Water feeding method upon reactor isolation

    International Nuclear Information System (INIS)

    Sasaki, Koichi; Takahara, Kuniaki; Hamamura, Kenji; Arakawa, Masahiro.

    1990-01-01

    The present invention concerns a method of feeding water upon reactor isolation in a plural loop type reactor having a plurality of reactor cooling systems. Water can be injected to a plurality of pools even if the pressure between the pools is not balanced and the water level in the reactor cooling system is optimally controlled. That is, water can be injected in accordance with the amount required for each of the pools by setting the opening of a turbine inlet steam control valve to somewhat higher than the cooling system pressure of the highest pressure loop. Water feeding devices upon reactor isolation were required by the same number as that for the reactor cooling systems. Whereas since pumps and turbines are used in common without worsening the water injection controllability to each of the loops according to the method of this invention and, accordingly, the cost performance can be improved. Further, since the opening degree of the turbine inlet steam control valve is controlled while making the difference pressure constant between the turbine inlet pressure and the pump exhaust pressure, the amount of the turbine exhausted steams can be reduced and, further, water injection controllability of the flow rate control valve in the injection line is improved. (I.S.)

  10. Water injection device for reactor container

    International Nuclear Information System (INIS)

    Sakaki, Isao.

    1996-01-01

    A pressure vessel incorporating a reactor core is placed and secured on a pedestal in a dry well of a reactor container. A pedestal water injection line is disposed opened at one end in a pedestal cavity passing through the side wall of the pedestal and led at the other end to the outside of the reactor container. A substitution dry well spray line is connected to a spray header disposed at the upper portion of the dry well. When the pressure vessel should be damaged by a molten reactor core and the molten reactor core should drop to the dry well upon occurrence of an accident, the molten reactor core on the floor of the pedestal is cooled by water injection from the pedestal water injection line. At the same time, the elevation of the pressure and the temperature in the reactor container is suppressed by the water injection of the substitution dry well spray line. This can avoid large scaled release of radioactive materials to the environmental circumference. (I.N.)

  11. WATER BOILER REACTOR

    Science.gov (United States)

    King, L.D.P.

    1960-11-22

    As its name implies, this reactor utilizes an aqueous solution of a fissionable element salt, and is also conventional in that it contains a heat exchanger cooling coil immersed in the fuel. Its novelty lies in the utilization of a cylindrical reactor vessel to provide a critical region having a large and constant interface with a supernatant vapor region, and the use of a hollow sleeve coolant member suspended from the cover assembly in coaxial relation with the reactor vessel. Cool water is circulated inside this hollow coolant member, and a gap between its outer wall and the reactor vessel is used to carry off radiolytic gases for recombination in an external catalyst chamber. The central passage of the coolant member defines a reflux condenser passage into which the externally recombined gases are returned and condensed. The large and constant interface between fuel solution and vapor region prevents the formation of large bubbles and minimizes the amount of fuel salt carried off by water vapor, thus making possible higher flux densities, specific powers and power densities.

  12. Water-immersion type ship reactor

    International Nuclear Information System (INIS)

    Okada, Hiroki; Yamamura, Toshio.

    1996-01-01

    In a water immersion-type ship reactor in which a water-tight wall is formed around a pressure vessel by way of an air permeable heat insulation layer and immersing the wall under water in a reactor container, a pressure equalizing means equipped with a back flow check valve and introducing a gas in a gas phase portion above the water level of the container into a water tight wall and a relief valve for releasing the gas in the water tight wall to the reactor container are disposed on the water tight wall. When the pressure in the water tight wall exceeds the pressure in the container, the gas in the water tight wall is released from the relief valve to the reactor container. On the contrary, when the pressure in the container exceeds the pressure in the water tight wall, the gas in the gas phase portion is flown from the pressure equalizing means equipped with a back flow check valve to the inside of the water tight wall. Thus, a differential pressure between both of them is kept around 0kg/cm 2 . A large differential pressure is not exerted on the water tight wall thereby capable of preventing rupture of them to improve reliability, as well as the thickness of the plate can be decreased thereby enabling to moderate the design for the pressure resistance and reduce the weight. (N.H.)

  13. The safety of light water reactors

    International Nuclear Information System (INIS)

    Pershagen, B.

    1986-04-01

    The book describes the principles and practices of reactor safety as applied to the design, regulation and operation of both pressurized water reactors and boiling water reactors. The central part of the book is devoted to methods and results of safety analysis. Some significant events are described, notably the Three Mile Island accident. The book concludes with a chapter on the PIUS principle of inherent reactor safety as applied to the SECURE type of reactor developed in Sweden. (G.B.)

  14. Radionuclide buildup in BWR [boiling water reactor] reactor coolant recirculation piping

    International Nuclear Information System (INIS)

    Duce, S.W.; Marley, A.W.; Freeman, A.L.

    1989-12-01

    Since the spring of 1985, thermoluminescent dosimeter, dose rate, and gamma spectral data have been acquired on the contamination of boiling water reactor primary coolant recirculation systems as part of a Nuclear Regulatory Commission funded study. Data have been gathered for twelve facilities by taking direct measurements and/or obtaining plant and vendor data. The project titled, ''Effectiveness and Safety Aspects of Selected Decontamination Processes'' (October 1983) initially reviewed the application of chemical decontamination processes on primary coolant recirculation system piping. Recontamination of the system following pipe replacement or chemical decontamination was studied as a second thrust of this program. During the course of this study, recontamination measurements were made at eight different commercial boiling water reactors. At four of the reactors the primary coolant recirculation system piping was chemically decontaminated. At the other four the piping was replaced. Vendor data were obtained from two boiling water reactors that had replaced the primary coolant recirculation system piping. Contamination measurements were made at two newly operating boiling water reactors. This report discusses the results of these measurements as they apply to contamination and recontamination of boiling water reactor recirculation piping. 16 refs., 29 figs., 9 tabs

  15. The pressurized heavy water reactor programme in the Republic of Korea

    International Nuclear Information System (INIS)

    Young Eek Jung

    1997-01-01

    KEPCO (Korea Electric Power Corporation) opened its HWR program in 1977 by starting the construction of Wolsong 1 (CANDU-6). Wolsong 1 completed its construction in 1983 and has been operated successfully achieving an average lifetime capacity factor of 85%. As far as PHWR technology is concerned, KEPCO did not have self reliance program like PWR but for the PHWR technology development of Korea, KEPCO and AECL made technology transfer agreement for the CANDU-6 NSSS design at the time of Wolsong 3 and 4 contracts. Under this agreement, AECL has provided the CANDU-6 design technology and it is contributing to the development of Korean PHWR design technology. In the field of fuel, KAERI (Korea Atomic Energy Research Institute) is carrying out the feasibility study of CANFLEX and DUPIC. Planning of future CANDU projects in Korea as well as type and capacity if constructed is under study by KEPCO. The economic aspects of CANDU-6, the future prospects of CANDU-9 technology development and availability of construction site will be the important points of study and it will be finished next year. The result of study will be reflected to the new Korean electric power development plan, which will extend Korean power plant construction schedule until 2010

  16. Water level monitoring device in nuclear reactor

    International Nuclear Information System (INIS)

    Miura, Kiyohide; Otake, Tomohiro.

    1988-01-01

    Purpose: To monitor the water level in a pressure vessel of BWR type nuclear reactors at high accuracy by improving the compensation functions. Constitution: In the conventional water level monitor in a nuclear reactor, if the pressure vessel is displaced by the change of the pressure in the reactor or the temperature of the reactor water, the relative level of the reference water head in a condensation vessel is changed to cause deviation between the actual water level and the indicated water level to reduce the monitoring accuracy. According to the invention, means for detecting the position of the reference water head and means for detection the position in the condensation vessel are disposed to the pressure vessel. Then, relative positional change between the condensation vessel and the reference water head is calculated based on detection sinals from both of the means. The water level is compensated and calculated by water level calculation means based on the relative positional change, water level signals from the level gage and the pressure signals from the pressure gage. As a result, if the pressure vessel is displaced due to the change of the temperature or pressure, it is possible to measure the reactor water level accurately thereby remakably improve the reliability for the water level control in the nuclear reactor. (Horiuchi, T.)

  17. Suppression device for the reactor water level lowering

    International Nuclear Information System (INIS)

    Kasuga, Hajime; Kasuga, Hiroshi.

    1984-01-01

    Purpose: To suppress the lowering in the reactor water level so as to avoid unnecessary actuation of ECCS upon generation of transient changes which forecasts the lowering of the reactor water level in a BWR type reactor. Constitution: There are provided a water level suppression signal generator for generating a water level suppression signal upon generation of a transient change signal which forecasts the water level lowering in a nuclear reactor and a recycling flow rate controller that applies a recycling flow rate control signal to a recycling pump drive motor by the water level lowering suppression signal. The velocity of the recycling pump is controlled by a reactor scram signal by way of the water level lowering suppresion signal generator and a recycling flow rate controller. Then, the recycling reactor core flow rate is decreased and the void amount in the reactor is transiently increased where the water level tends to increase. Accordingly, the water level lowering by the scram is moderated by the increasing tendency of the water level. (Ikeda, J.)

  18. European supercritical water cooled reactor

    International Nuclear Information System (INIS)

    Schulenberg, T.; Starflinger, J.; Marsault, P.; Bittermann, D.; Maraczy, C.; Laurien, E.; Lycklama a Nijeholt, J.A.; Anglart, H.; Andreani, M.; Ruzickova, M.; Toivonen, A.

    2011-01-01

    Highlights: → The HPLWR reactor design is an example of a supercritical water cooled reactor. → Cladding material tests have started but materials are not yet satisfactory. → Numerical heat transfer predictions are promising but need further validation. → The research project is most suited for nuclear education and training. - Abstract: The High Performance Light Water Reactor (HPLWR), how the European Supercritical Water Cooled Reactor is called, is a pressure vessel type reactor operated with supercritical water at 25 MPa feedwater pressure and 500 o C average core outlet temperature. It is designed and analyzed by a European consortium of 10 partners and 3 active supporters from 8 Euratom member states in the second phase of the HPLWR project. Most emphasis has been laid on a core with a thermal neutron spectrum, consisting of small fuel assemblies in boxes with 40 fuel pins each and a central water box to improve the neutron moderation despite the low coolant density. Peak cladding temperatures of the fuel rods have been minimized by heating up the coolant in three steps with intermediate coolant mixing. The containment design with its safety and residual heat removal systems is based on the latest boiling water reactor concept, but with different passive high pressure coolant injection systems to cause a forced convection through the core. The design concept of the steam cycle is indicating the envisaged efficiency increase to around 44%. Moreover, it provides the constraints to design the components of the balance of the plant. The project is accompanied by numerical studies of heat transfer of supercritical water in fuel assemblies and by material tests of candidate cladding alloys, performed by the consortium and supported by additional tests of the Joint Research Centre of the European Commission. Besides the scientific and technical progress, the HPLWR project turned out to be most successful in training the young generation of nuclear engineers

  19. Pressurized water reactor flow arrangement

    International Nuclear Information System (INIS)

    Gibbons, J.F.; Knapp, R.W.

    1980-01-01

    A flow path is provided for cooling the control rods of a pressurized water reactor. According to this scheme, a small amount of cooling water enters the control rod guide tubes from the top and passes downwards through the tubes before rejoining the main coolant flow and passing through the reactor core. (LL)

  20. Heavy water moderated tubular type nuclear reactor

    International Nuclear Information System (INIS)

    Oohashi, Masahisa.

    1986-01-01

    Purpose: To enable to effectively change the volume of heavy water per unit fuel lattice in heavy water moderated pressure tube type nuclear reactors. Constitution: In a nuclear reactor in which fuels are charged within pressure tubes and coolants are caused to flow between the pressure tubes and the fuels, heavy water tubes for recycling heavy water are disposed to a gas region formed to the outside of the pressure tubes. Then, the pressure tube diameter at the central portion of the reactor core is made smaller than that at the periphery of the reactor core. Further, injection means for gas such as helium is disposed to the upper portion for each of the heavy water tubes so that the level of the heavy water can easily be adjusted by the control for the gas pressure. Furthermore, heavy water reflection tubes are disposed around the reactor core. In this constitution, since the pitch for the pressure tubes can be increased, the construction and the maintenance for the nuclear reactor can be facilitated. Also, since the liquid surface of the heavy water in the heavy water tubes can be varied, nuclear properties is improved and the conversion ratio is improved. (Ikeda, J.)

  1. Pressurized water reactor simulator. Workshop material

    International Nuclear Information System (INIS)

    2003-01-01

    The International Atomic Energy Agency (IAEA) has established an activity in nuclear reactor simulation computer programs to assist its Member States in education. The objective is to provide, for a variety of advanced reactor types, insight and practice in their operational characteristics and their response to perturbations and accident situations. To achieve this, the IAEA arranges for the development and distribution of simulation programs and educational material and sponsors courses and workshops. The workshops are in two parts: techniques and tools for reactor simulator development; and the use of reactor simulators in education. Workshop material for the first part is covered in the IAEA Training Course Series No. 12, 'Reactor Simulator Development' (2001). Course material for workshops using a WWER- 1000 reactor department simulator from the Moscow Engineering and Physics Institute, the Russian Federation is presented in the IAEA Training Course Series No. 21 'WWER-1000 Reactor Simulator' (2002). Course material for workshops using a boiling water reactor simulator developed for the IAEA by Cassiopeia Technologies Incorporated of Canada (CTI) is presented in the IAEA publication: Training Course Series No.23 'Boiling Water Reactor Simulator' (2003). This report consists of course material for workshops using a pressurized water reactor simulator

  2. Water simulation of sodium reactors

    International Nuclear Information System (INIS)

    Grewal, S.S.; Gluekler, E.L.

    1981-01-01

    The thermal hydraulic simulation of a large sodium reactor by a scaled water model is examined. The Richardson Number, friction coefficient and the Peclet Number can be closely matched with the water system at full power and the similarity is retained for buoyancy driven flows. The simulation of thermal-hydraulic conditions in a reactor vessel provided by a scaled water experiment is better than that by a scaled sodium test. Results from a correctly scaled water test can be tentatively extrapolated to a full size sodium system

  3. Emergency water supply facility for nuclear reactor

    International Nuclear Information System (INIS)

    Karasawa, Toru

    1998-01-01

    Water is stored previously in an equipment storage pit disposed on an operator floor of a reactor building instead of a condensate storage vessel. Upon occurrence of an emergency, water is supplied from the equipment storage pit by way of a sucking pipeline to a pump of a high pressure reactor core water injection circuit and a pump of a reactor-isolation cooling circuit to supply water to a reactor. The equipment storage pit is arranged in a building so that the depth thereof is determined to keep the required amount of water by storing water at a level lower than the lower end of a pool gate during normal operation. Water is also supplied from the equipment storage pit by way of a supply pipeline to a spent fuel storage pool on the operation floor of the reactor building. Namely, water is supplied to the spent fuel storage pool by a pump of a fuel pool cooling and cleaning circuit. This can eliminate a suppression pool cleaning circuit. (I.N.)

  4. Development of inspection equipment for fuel bundles of CANDU-PHWR using R981 underwater radiation tolerant camera

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Dae-Seo; Cho, Moon-Sung; Jo, Chang-Keun; Jun, Ji-Su; Jung, Jong Yeob; Park, Kwang-June; Suk, Ho-Chun

    2005-03-15

    The inspection equipment of fuel bundles was developed, which could perform visual inspection and dimensional measurement on fuel bundles of CANDU-PHWR, to evaluate, analyze the defective behavior of fuel bundles and inner surface of pressure tubes of inherent two-phase flow over 24kg/s in CANDU-6. The R981 radiation tolerant camera system with pan and tilt function was ordered and manufactured, which was waterproof, shielding radiation in underwater 10m in depth. The performance test, of the system ,due to camera-object distance was carried out in air/underwater atmosphere. The results of performance test of R981 radiation tolerant camera system are good. The inspection equipment of fuel bundles using R981 radiation tolerant camera system and underwater-radiation tolerant LVDT sensor(D5/200AW) was fabricated, which could perform visual inspection and dimensional measurement on fuel bundles of CANDU-PHWR with measurement accuracy 10{mu}m. This equipment will be utilizable integrity evaluation of fuel bundles which are irradiated in pressure tube of CANDU-PHWR.

  5. CARA CVN: inherently safe fuel element for PHWR power plants

    International Nuclear Information System (INIS)

    Brasnarof, Daniel O.; Lestani, Hector A.; Agueda, Horacio C.; Marino, Armando C.; Florido, Pablo C.; Daverio, Hernando

    2007-01-01

    This paper presents design alternatives of the CARA fuel element with negative void reactivity coefficient (CVN) enhancing the PHWR safety for L-LOCA sequences. This design enhances the safety and the operation performance in Atucha and Embalse without changes in the operation conditions. This new design balances wide performance margins of CARA SEU 0.9% previous design, with new intrinsic safety requirements without economic penalties. (author) [es

  6. SBWR: A simplified boiling water reactor

    International Nuclear Information System (INIS)

    Duncan, J.D.; Sawyer, C.D.; Lagache, M.P.

    1987-01-01

    An advanced light water reactor concept is being developed for possible application in the 1990's. The concept, known as SBWR is a boiling water reactor which uses natural circulation to provide flow to the reactor core. In an emergency, a gravity driven core cooling system is used. The reactor is depressurized and water from an elevated suppression pool flows by gravity to the reactor vessel to keep the reactor core covered. The concept also features a passive containment cooling system in which water flows by gravity to cool the suppression pool wall. No operator action is required for a period of at least three days. Use of these and other passive systems allows the elimination of emergency diesel generators, core cooling pumps and heat removal pumps which is expected to simplify the plant design, reduce costs and simplify licensing. The concept is being developed by General Electric, Bechtel and the Massachusetts Institute of Technology supported by the Electric Power Research Institute and the United States Department of Energy in the United States. In Japan, The Japan Atomic Power Company has a great interest in this concept

  7. Boiling water reactor simulator. Workshop material

    International Nuclear Information System (INIS)

    2003-01-01

    The International Atomic Energy Agency (IAEA) has established an activity in nuclear reactor simulation computer programs to assist its Member States in education. The objective is to provide, for a variety of advanced reactor types, insight and practice in their operational characteristics and their response to perturbations and accident situations. To achieve this, the IAEA arranges for the development and distribution of simulation programs and workshop material and sponsors workshops. The workshops are in two parts: techniques and tools for reactor simulator development; and the use of reactor simulators in education. Workshop material for the first part is covered in the IAEA publication: Training Course Series No. 12, 'Reactor Simulator Development' (2001). Course material for workshops using a WWER- 1000 simulator from the Moscow Engineering and Physics Institute, Russian Federation is presented in the IAEA publication: Training Course Series No. 21 'WWER-1000 Reactor Simulator' (2002). Course material for workshops using a pressurized water reactor (PWR) simulator developed by Cassiopeia Technologies Incorporated, Canada, is presented in the IAEA publication: Training Course Series No. 22 'Pressurized Water Reactor Simulator' (2003). This report consists of course material for workshops using a boiling water reactor (BWR) simulator. Cassiopeia Technologies Incorporated, developed the simulator and prepared this report for the IAEA

  8. Reactor Safety Commission Code of Practice for Pressurized Water Reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The Reactor Safety Commission of the Federal German Republic has summarized in the form of Official Guidelines the safety requirements which, in the Commission's view, have to be met in the design, construction and operation of a nuclear power station equipped with a pressurized water reactor. The Third Edition of the RSK Guidelines for pressurized water reactors dated 14.10.81. is a revised and expanded version of the Second Edition dated 24.1.79. The Reactor Safety Commission will with effect from October 1981 use these Guidelines in consultations on the siting of and safety concept for the installation approval of future pressurized water reactors and will assess these nuclear power stations during their erection in the light of these Guidelines. They have not however been immediately conceived for the adaptation of existing nuclear power stations, whether under construction or in operation. The scope of application of these Guidelines to such nuclear power stations will have to be examined for each individual case. The main aim of the Guidelines is to simplify the consultation process within the reactor Safety Commission and to provide early advice on the safety requirements considered necessary by the Commission. (author)

  9. Method of operating heavy water moderated reactors

    International Nuclear Information System (INIS)

    Masuda, Hiroyuki.

    1980-01-01

    Purpose: To enable stabilized reactor control, and improve the working rate and the safety of the reactor by removing liquid poison in heavy water while maintaining the power level constant to thereby render the void coefficient of the coolants negative in the low power operation. Method: The operation device for a heavy water moderated reactor comprises a power detector for the reactor, a void coefficient calculator for coolants, control rods inserted into the reactor, a poison regulator for dissolving poisons into or removing them out of heavy water and a device for removing the poisons by the poison regulator device while maintaining the predetermined power level or inserting the control rods by the signals from the power detector and the void coefficient calculator in the high temperature stand-by conditions of the reactor. Then, the heavy water moderated reactor is operated so that liquid poisons in the heavy water are eliminated in the high temperature stand-by condition prior to the start for the power up while maintaining the power level constant and the plurality of control rods are inserted into the reactor core and the void coefficient of the coolants is rendered negative in the low power operation. (Seki, T.)

  10. Advances in light water reactor technologies

    CERN Document Server

    Saito, Takehiko; Ishiwatari, Yuki; Oka, Yoshiaki

    2010-01-01

    ""Advances in Light Water Reactor Technologies"" focuses on the design and analysis of advanced nuclear power reactors. This volume provides readers with thorough descriptions of the general characteristics of various advanced light water reactors currently being developed worldwide. Safety, design, development and maintenance of these reactors is the main focus, with key technologies like full MOX core design, next-generation digital I&C systems and seismic design and evaluation described at length. This book is ideal for researchers and engineers working in nuclear power that are interested

  11. The nuclear reactor strategy between fast breeder reactors and advanced pressurized water reactors

    International Nuclear Information System (INIS)

    Seifritz, W.

    1983-01-01

    A nuclear reactor strategy between fast breeder reactors (FBRs) and advanced pressurized water reactors (APWRs) is being studied. The principal idea of this strategy is that the discharged plutonium from light water reactors (LWRs) provides the inventories of the FBRs and the high-converter APWRs, whereby the LWRs are installed according to the derivative of a logistical S curve. Special emphasis is given to the dynamics of reaching an asymptotic symbiosis between FBRs and APWRs. The main conclusion is that if a symbiotic APWR-FBR family with an asymptotic total power level in the terawatt range is to exist in about half a century from now, we need a large number of FBRs already in an early phase

  12. Pressurised water reactor operation

    International Nuclear Information System (INIS)

    Birnie, S.; Lamonby, J.K.

    1987-01-01

    The operation of a pressurized water reactor (PWR) is described with respect to the procedure for a unit start-up. The systems details and numerical data are for a four loop PWR station of the design proposed for Sizewell-'B', United Kingdom. A description is given of: the initial conditions, filling the reactor coolant system (RCS), heat-up and pressurisation of the RCS, secondary system preparations, reactor start-up, and reactivity control at power. (UK)

  13. Method of measuring reactor water level

    International Nuclear Information System (INIS)

    Shinohara, Kaoru.

    1979-01-01

    Purpose: To provide a water level measuring system so that a reactor water level detecting signal can be corrected in correspondence to a recirculation flow, thereby to carry out a correct water level detection in a wide range of the reactor. Method: According to the operation record of a precursor reactor, the ratio Δh of the lowering of the water level due to the recirculation flow is lowered in proportion to the ratiowith respect to the rated differential pressure of the recirculation flow. Accordingly, the flow of recirculation pump is measured by an elbow differential pressure generator utilizing an elbow of a pipe, and the measured value is multiplied by a gain by a ratio setter, and therefter, an addition computation is carried out by an adder for correcting the signal from a water level detector. When the signal from the water level detector is corrected in this manner, the influence of the lowering of the water level due to the recirculation flow can be removed, and an interlocker predetermined in the defined water level can be actuated, thus the influence of the dynamic pressure due to the recirculation flow acting on the instrumental pipe line detecting the reactor water level can be removed effectively. (Yoshino, Y.)

  14. Reactor water quality degradation suppressing method upon reactor start up

    International Nuclear Information System (INIS)

    Maeda, Katsuharu.

    1993-01-01

    Preceding to reactor start-up, vacuum degree in a condenser is increased, and after the vacuum degree has been increased sufficiently, a desalting tower is inserted. Then, water feed to the reactor is started and the reactor is operated so that water is supplied gradually. Thus, dissolved oxygen in the feedwater and condensates is kept low and an entire organic carbon leaching rate from resins in the condensate desalting tower is reduced. Further, since feedwater is gradually supplied after the start-up, the entire organic carbon brought into the reactor is decomposed by heat and radiation and efficiently removed by a reactor coolant cleanup system. As a result, corrosion of stainless steel or the like is suppressed, as well as integrity of fuels can be maintained. Further, degradation of water quality can be suppressed effectively not by additionally putting the condensate desalting towers to in-service in accordance with the increase of the feedwater flow rate accompanying the power up but by previously putting the condensate desalting towers to in-service. (N.H.)

  15. On line monitoring of temperatures of coolant channels by thermal imaging in a laboratory set-up fabricated for the detection of leakage of coolants

    Energy Technology Data Exchange (ETDEWEB)

    Mukherjee, S; Ghosh, J K [Bhabha Atomic Research Centre, Bombay (India). Radiometallurgy Div.; Patel, R J [Bhabha Atomic Research Centre, Mumbai (India). Refuelling Technology Division

    1994-12-31

    Leakage from coolant channels in Pressurised Heavy Water Reactors (PHWR) increases the temperatures of the faulty channels. Measurement of temperatures of the coolant channels is, therefore, one way to detect the leaking channel. Thermal imaging technique offers a unique means for this detection providing a fast, non-contact, on-line measurement. An experiment was carried out for the detection of leakage of coolants through the seal plugs of the coolant channels in PHWR using an experimental setup under the simulated conditions of temperature and pressure of the coolant channels inside the reactor and using an infrared imaging system. The experimental details and the observations have been presented. 7 figs.

  16. On line monitoring of temperatures of coolant channels by thermal imaging in a laboratory set-up fabricated for the detection of leakage of coolants

    International Nuclear Information System (INIS)

    Mukherjee, S.; Ghosh, J.K.; Patel, R.J.

    1994-01-01

    Leakage from coolant channels in Pressurised Heavy Water Reactors (PHWR) increases the temperatures of the faulty channels. Measurement of temperatures of the coolant channels is, therefore, one way to detect the leaking channel. Thermal imaging technique offers a unique means for this detection providing a fast, non-contact, on-line measurement. An experiment was carried out for the detection of leakage of coolants through the seal plugs of the coolant channels in PHWR using an experimental setup under the simulated conditions of temperature and pressure of the coolant channels inside the reactor and using an infrared imaging system. The experimental details and the observations have been presented. 7 figs

  17. High converter pressurized water reactor with heavy water as a coolant

    International Nuclear Information System (INIS)

    Ronen, Y.; Reyev, D.

    1983-01-01

    There is an increasing interest in water breeder and high converter reactors. The increase in the conversion ratio of these reactors is obtained by hardening the neutron spectrum achieved by tightening the reactor's lattice. Another way of hardening the neutron spectrum is to replace the light water with heavy water. Two pressurized water reactor fuel cycles that use heavy water as a coolant are considered. The first fuel cycle is based on plutonium and depleted uranium, and the second cycle is based on plutonium and enriched uranium. The uranium ore and separative work unit (SWU) requirements are calculated as well as the fuel cycle cost. The savings in uranium ore are about40 and 60% and about40% in SWU for both fuel cycles considered

  18. Role of image analysis in quantitative characterisation of nuclear fuel materials

    International Nuclear Information System (INIS)

    Dubey, J.N.; Rao, T.S.; Pandey, V.D.; Majumdar, S.

    2005-01-01

    Image analysis is one of the important techniques, widely used for materials characterization. It provides the quantitative estimation of the microstructural features present in the material. This information is very much valuable for finding out the criteria for taking up the fuel for high burn up. Radiometallurgy Division has been carrying out development and fabrication of plutonium related fuels for different type of reactors viz. Purnima, Fast Breeder Test Reactor (FBTR), Prototype Fast Breeder Reactor (PFBR), Boiling Water Reactor (BWR), Advanced Heavy Water Reactor (AHWR), Pressurised Heavy Water Reactor (PHWR) and KAMINI Reactor. Image analysis has been carried out on microstructures of PHWR, AHWR, FBTR and KAMINI fuels. Samples were prepared as per standard ASTM metallographic procedure. Digital images of the microstructure of these specimens were obtained using CCD camera, attached to the optical microscope. These images are stores on computer and used for detection and analysis of features of interest with image analysis software. Quantitative image analysis technique has been standardised and used for finding put type of the porosity, its size, shape and distribution in the above sintered oxide and carbide fuels. This technique has also been used for quantitative estimation of different phases present in KAMINI fuel. Image analysis results have been summarised and presented in this paper. (author)

  19. Reactivity control of nuclear power reactors: new options

    International Nuclear Information System (INIS)

    Alcala, F.

    1984-01-01

    Some actual aspects (referring to economy, non-proliferation and environmental impact) of nuclear power reactors has been analyzed from the point of view of the reactivity control physics. Specially studied have been the physical mechanisms related with the spectral shift control method and their general positive effects on those aspects. The analysis carried out suggested the application of the above method of control to reactors with non-hydrogenous fuel cells, which are mainly characterized by their high moderator/fuel ratio. Finally three different types of such fuel cells are presented and some results about one of them (belonging to a PHWR controlled by graphite rods) are given. (author)

  20. The AECL reactor development programme

    International Nuclear Information System (INIS)

    Menelely, D.A.

    1997-01-01

    The modem CANDU-PHWR power reactor is the result of more than 50 years of evolutionary design development in Canada. It is one of only three commercially successful designs in the world to this date. The basis for future development is the CANDU 6 and CANDU 9 models. Four of the first type are operating and four more will go an line before the end of this decade. The CANDU 9 is a modernized single-unit version of the twelve large multi-unit plants operated by Ontario Hydro. All of these plants use proven technology which resulted from research, development, design construction, and operating experience over the past 25 years. Looking forward another 25 years, AECL plans to retain all of the essential features that distinguish today's CANDU reactors (heavy water moderation, on-power fuelling simple bundle design, horizontal fuel channels, etc.). The end product of the planned 25-year development program is more than a specific design - it is a concept which embodies advanced features expected from ongoing R and D programs. To carry out the evolutionary work we have selected seven main areas for development: Safety Technology, Fuel and Fuel Cycles, Fuel Channels, Systems and Components, Heavy Water and Tritium Information Technology, and Construction. There are three strategic measures of success for each of these work areas: improved economics, advanced fuel cycle utilization, and enhanced safety/plant robustness. The paper describes these work programs and the overall goals of each of them. (author)

  1. Reactor water clean-up device

    International Nuclear Information System (INIS)

    Sawa, Toshio; Takahashi, Sankichi; Takashima, Yoshie.

    1983-01-01

    Purpose: To efficiently eliminate radioactive materials such as iron oxide and cobalt ions with less heat loss by the use of an electrode assembly applied with a direct current. Constitution: In a reactor water clean-up device adapted to pass reactor water through an electrode assembly comprising at least a pair of anode and cathode applied with a direct current to eliminate various types of ions contained in the reactor water by way of the electrolysis or charge neutralization at the anode, the cathode is constituted with a corrosion resistant grid-like or porous metal plate and a layer to the upper portion of the metal plate filled with a plurality of metal spheres of about 1 - 5 mm diameter, and the anode is made of insoluble porous or spirally wound metal material. (Seki, T.)

  2. Hydrogen water chemistry for boiling water reactors

    International Nuclear Information System (INIS)

    Cowan, R.L.; Cowan, R.L.; Kass, J.N.; Law, R.J.

    1985-01-01

    Hydrogen Water Chemistry (HWC) is now a practical countermeasure for intergranular stress corrosion cracking (IGSCC) susceptibility of reactor structural materials in Boiling Water Reactors (BWRs). The concept, which involves adding hydrogen to the feedwater to suppress the formation of oxidizing species in the reactor, has been extensively studied in both the laboratory and in several operating plants. The Dresden-2 Unit of Commonwealth Edison Company has completed operation for one full 18-month fuel cycle under HWC conditions. The specifications, procedures, equipment, instrumentation and surveillance programs needed for commercial application of the technology are available now. This paper provides a review of the benefits to be obtained, the side affects, and the special operational considerations needed for commercial implementation of HWC. Technological and management ''Lessons Learned'' from work conducted to date are also described

  3. New lineup of light water reactors

    International Nuclear Information System (INIS)

    Okamura, Kiyoshi; Oshima, Koichiro; Kitsukawa, Keisuke

    2007-01-01

    Toshiba is promoting technical studies for upcoming nuclear power plants based on its large accumulation of experience in boiling water reactor (BWR) design, manufacturing, construction, and maintenance. Our goal is to achieve higher reliability, lower life-cycle costs, and better competitiveness for nuclear power plants compared with other energy sources. In addition, we are developing a new light water reactor (LWR) lineup featuring the safest and most economical LWRs in the world as next-generation reactors almost at new construction and replacement in the Japanese and international markets expected to start from the 2020s. We are committed not only to developing BWRs with the world's highest performance but also to participating in the pressurized water reactor (PWR) market, taking advantage of the synergistic effect of both Toshiba's and Westinghouse's experience. (author)

  4. Water Chemistry Section: progress report (1981-82)

    International Nuclear Information System (INIS)

    Dharwadkar, S.R.; Ramshesh, V.

    1983-01-01

    The activities of the Water Chemistry Section of the Bhabha Atomic Research Centre (BARC), Bombay, during the years 1981 and 1982 are reported in the form of individual summaries. The research activities of the Section cover the following areas: (1) chemistry and thermodynamics of nuclear materials, (2) crystal structure of organo-metallic complexes using X-ray diffraction, (3) thermophysical and phase transition studies, (4) solid state chemistry and thermochemical studies, (5) water and steam chemistry of heavy water plants and phwr type reactors, and (6) uranium isotope exchange studies. A survey is also given of: (i) the Section's participation in advisory and consultancy services in nuclear and thermal power stations, (ii) training activities, and (iii) assistance in chemical analysis by various techniques to other units of BARC and outside agencies. A list of publications and lectures by the staff during the report period is included. (M.G.B.)

  5. Auxiliary water supply device for BWR type reactor

    International Nuclear Information System (INIS)

    Sasagawa, Hiroshi.

    1994-01-01

    In the device of the present invention, a cooling condensation means is disposed to a steam discharge channel of a turbine for driving pumps to directly return condensates to the reactor, so that the temperature of the suppression pool water is not elevated. Namely, the cooling condensation means for discharged steams is disposed to the discharge channel of the turbine. The condensate channel from the cooling condensation means is connected to a sucking side of the turbine driving pump. With such a constitution, when the reactor is isolated from a main steam system, reactor scram is conducted. Although the reactor water level is lowered by the reactor scram, the lowering of the reactor water level is prevented by supplementing cooling water by the turbine driving pump using steams generated in the reactor as a power source. The discharged steams after driving the turbine are cooled and condensated by the cooling condensation means by way of the discharge channel and returned to the reactor again by way of the condensate channel. With such procedures, since the temperature of suppression pool water is not elevated, there is no need to operate other cooling systems. In addition, auxiliary water can be supplied for a long period of time. (I.S.)

  6. In-core fuel management programs for nuclear power reactors

    International Nuclear Information System (INIS)

    1984-10-01

    In response to the interest shown by Member States, the IAEA organized a co-ordinated research programme to develop and make available in the open domain a set of programs to perform in-core fuel management calculations. This report summarizes the work performed in the context of the CRP. As a result of this programme, complete in-core fuel management packages for three types of reactors, namely PWR's, BWR's and PHWR are now available from the NEA Data Bank. For some reactor types, these program packages are available with three levels of sophistication ranging from simple methods for educational purposes to more comprehensive methods that can be used for reactor design and operation. In addition some operating data have been compiled to allow code validation. (author)

  7. The heavy water accountancy for research reactors in JAERI

    International Nuclear Information System (INIS)

    Yoshijima, Tetsuo; Tanaka, Sumitoshi; Nemoto, Denjirou

    1998-11-01

    The three research reactors have been operated by the Department of Research Reactor and used about 41 tons heavy water as coolant, moderator and reflector of research reactors. The JRR-2 is a tank type research reactor of 10MW in thermal power and its is used as moderator, coolant and reflector about 16 tons heavy water. The JRR-3M is a light water cooled and moderated pool type research reactor with a thermal power of 20MW and its is used as reflector about 7.3 tons heavy water. In the JRR-4, which is a light water cooled swimming pool type research reactor with the maximum thermal power of 3.5MW, about 1 ton heavy water is used to supply fully thermalized neutrons with a neutron beam experiment of facility. The heavy water was imported from U.S.A., CANADA and Norway. Parts of heavy water is internationally controlled materials, therefore management of heavy water is necessary for materials accountancy. This report described the change of heavy water inventories in each research reactors, law and regulations for accounting of heavy water in JAERI. (author)

  8. Status of the advanced boiling water reactor and simplified boiling water reactor

    International Nuclear Information System (INIS)

    Smith, P.F.

    1992-01-01

    This paper reports that the excess of U.S. electrical generating capacity which has existed for the past 15 years is coming to an end as we enter the 1990s. Environmental and energy security issues associated with fossil fuels are kindling renewed interest in the nuclear option. The importance of these issues are underscored by the National Energy Strategy (NES) which calls for actions which are designed to ensure that the nuclear power option is available to utilities. Utilities, utility associations, and nuclear suppliers, under the leadership of the Nuclear Power Oversight Committee (NPOC), have jointly developed a 14 point strategic plan aimed at establishing a predictable regulatory environment, standardized and pre-licensed Advanced Light Water Reactor (ALWR) nuclear plants, resolving the long-term waste management issue, and other enabling conditions. GE is participating in this national effort and GE's family of advanced nuclear power plants feature two new reactor designs, developed on a common technology base, aimed at providing a new generation of nuclear plants to provide safe, clean, economical electricity to the world's utilities in the 1990s and beyond. Together, the large-size (1300 MWe) Advanced Boiling Water Reactor (ABWR) and the small-size (600 MWe) Simplified Boiling Water Reactor (SBWR) are innovative, near-term candidates for expanding electrical generating capacity in the U.S. and worldwide. Both possess the features necessary to do so safely, reliably, and economically

  9. Nuclear fuels and development of nuclear fuel elements

    International Nuclear Information System (INIS)

    Sundaram, C.V.; Mannan, S.L.

    1989-01-01

    Safe, reliable and economic operation of nuclear fission reactors, the source of nuclear power at present, requires judicious choice, careful preparation and specialised fabrication procedures for fuels and fuel element structural materials. These aspects of nuclear fuels (uranium, plutonium and their oxides and carbides), fuel element technology and structural materials (aluminium, zircaloy, stainless steel etc.) are discussed with particular reference to research and power reactors in India, e.g. the DHRUVA research reactor at BARC, Trombay, the pressurised heavy water reactors (PHWR) at Rajasthan and Kalpakkam, and the Fast Breeder Test Reactor (FBTR) at Kalpakkam. Other reactors like the gas-cooled reactors operating in UK are also mentioned. Because of the limited uranium resources, India has opted for a three-stage nuclear power programme aimed at the ultimate utilization of her abundant thorium resources. The first phase consists of natural uranium dioxide-fuelled, heavy water-moderated and cooled PHWR. The second phase was initiated with the attainment of criticality in the FBTR at Kalpakkam. Fast Breeder Reactors (FBR) utilize the plutonium and uranium by-products of phase 1. Moreover, FBR can convert thorium into fissile 233 U. They produce more fuel than is consumed - hence, the name breeders. The fuel parameters of some of the operating or proposed fast reactors in the world are compared. FBTR is unique in the choice of mixed carbides of plutonium and uranium as fuel. Factors affecting the fuel element performance and life in various reactors e.g. hydriding of zircaloys, fuel pellet-cladding interaction etc. in PHWR and void swelling; irradiation creep and helium embrittlement of fuel element structural materials in FBR are discussed along with measures to overcome some of these problems. (author). 15 refs., 9 tabs., 23 figs

  10. Water cooled nuclear reactor

    International Nuclear Information System (INIS)

    1975-01-01

    A description is given of a cooling water intake collector for a nuclear reactor. It includes multiple sub-collectors extending out in a generally parallel manner to each other, each one having a first end and a second one separated along their length, and multiple water outlets for connecting each one to a corresponding pressure tube of the reactor. A first end tube and a second one connect the sub-collector tubes together to their first and second ends respectively. It also includes multiple collector tubes extending transversely by crossing over the sub-collector tubes and separated from each other in the direction of these tubes. Each collector tubes has a water intake for connecting to a water pump and multiple connecting tubes separated over its length and connecting each one to the corresponding sub-collector [fr

  11. State space modeling of reactor core in a pressurized water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ashaari, A.; Ahmad, T.; M, Wan Munirah W. [Department of Mathematical Science, Faculty of Science, Universiti Teknologi Malaysia, 81310 Skudai, Johor (Malaysia); Shamsuddin, Mustaffa [Institute of Ibnu Sina, Universiti Teknologi Malaysia, 81310 Skudai, Johor (Malaysia); Abdullah, M. Adib [Swinburne University of Technology, Faculty of Engineering, Computing and Science, Jalan Simpang Tiga, 93350 Kuching, Sarawak (Malaysia)

    2014-07-10

    The power control system of a nuclear reactor is the key system that ensures a safe operation for a nuclear power plant. However, a mathematical model of a nuclear power plant is in the form of nonlinear process and time dependent that give very hard to be described. One of the important components of a Pressurized Water Reactor is the Reactor core. The aim of this study is to analyze the performance of power produced from a reactor core using temperature of the moderator as an input. Mathematical representation of the state space model of the reactor core control system is presented and analyzed in this paper. The data and parameters are taken from a real time VVER-type Pressurized Water Reactor and will be verified using Matlab and Simulink. Based on the simulation conducted, the results show that the temperature of the moderator plays an important role in determining the power of reactor core.

  12. Core safety of Indian nuclear power plants (NPPs) under extreme ...

    Indian Academy of Sciences (India)

    Of course, the accidents led to release of radioactivity due to probable melt down of reactor ... advances in technology and a better understanding of the nuclear power, the ..... PHWR system offers certain intrinsic advantages (Narora Atomic Power ...... system, Non Active Process Water System (NAPWS), Service Water Sys-.

  13. Procedure for operating a heavy water cooled power reactor

    International Nuclear Information System (INIS)

    Rau, P.; Kumpf, H.

    1981-01-01

    Nuclear reactors cooled by heavy water usually have equipment for fuel element exchange during operation, with the primary circuit remaining contained. This fuel element exchange equipment is expensive and complicated in many respects. According to the invention, the heavy water is therefore replaced by light water after a certain time of operation in such way that light water is led in and heavy water is led off. After the replacement, at least a quarter of the fuel elements of the reactor core is exchanged with the reactor pressure vessel being open. Then the light water serving as a shielding is replaced by heavy water, with the reactor pressure vessel being closed. The invention is of interest particularly for high-conversion reactors. (orig.) [de

  14. Facing the facts: the suspension of a design requirement applicable to nuclear power reactor effluents

    International Nuclear Information System (INIS)

    Amado, Valeria; Biaggio, Alfredo; Canoba, Analia; Curti, Adriana

    2008-01-01

    A design requirement aimed at limiting the discharge of globally dispersed long-lived radionuclides released by nuclear power reactors was in force in Argentine since 1979 till recently. The practical results of such regulatory measure was the need to retain C-14 in the PHWR under construction, as well as in furniture heavy water reactors to be built in the country. This paper explains the basis of such requirement, which was formulated as a collective dose constraint per unit of energy generated, and the main assumptions that triggered it. The differences between the assumptions made at the time and the reality of nuclear power generation at the beginning of the 21 st century, as well as their implications in relation to the requirement are described, including the Suess effect and its impact in the total dose due to C-14. Finally, the facts that made no longer reasonable to keep in force the above mentioned requirement are presented. (author)

  15. Feedwater processing method in a boiling water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Izumitani, M; Tanno, K

    1976-09-06

    The purpose of the invention is to decrease a quantity of corrosion products moving from the feedwater system to the core. Water formed into vapor after heated in a reactor is fed to the turbine through a main steam line to drive a generator to return it to liquid-state water in a condenser. The water is then again cycled into the reactor via the condensate pump, desalting unit, low pressure feedwater heater, medium pressure feedwater heater, and high pressure feedwater heater. The reactor water is recycled by a recycling pump. At this time, the reactor water recycled by the recycling pump is partially poured into a middle point between the desalting unit and the low pressure feedwater heater through a reducing valve or the like. With the structure described above, the quantity of the corrosion products from the feedwater system may be decreased by the function of a large quantity of active oxygen contained in the reactor water.

  16. Water desalination using different capacity reactors options

    International Nuclear Information System (INIS)

    Alonso, G.; Vargas, S.; Del Valle, E.; Ramirez, R.

    2010-01-01

    The Northwest region of Mexico has a deficit of potable water, along this necessity is the region growth, which requires of additional energy capacity, cogeneration of potable water production and nuclear electricity is an option to be assessed. In this paper we will perform an economical comparison for cogeneration using a big reactor, the AP1000, and a medium size reactor, the IRIS, both of them are PWR type reactors and will be coupled to the desalination plant using the same method. For this cogeneration case we will assess the best reactor option that can cover both needs using the maximum potable water production for two different desalination methods: Multistage Flash Distillation and Multi-effect Distillation. (authors)

  17. Press kit. EPR (European pressurized water reactor). The advanced nuclear reactor

    International Nuclear Information System (INIS)

    2004-10-01

    Nuclear energy, which provides a steady supply of electricity at low cost, has its rightful place in the energy mix of the 21 century, which puts the emphasis on sustainable development. In this framework, this document presents the advantages of the EPR (European Pressurized water Reactor). The EPR is the only third generation reactor under construction today. It is an evolutionary reactor that represents a new generation of pressurized water reactors with no break in the technology used for the most recent models. The EPR can guarantee a safe, inexpensive electricity supply, without adding to the greenhouse effect. It meets the requirements of the safety authorities and lives up to the expectations of electricity utilities. (A.L.B.)

  18. Pressurised water reactor in the UK

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    Since the Three Mile Island accident there has been much debate about the safety considerations of Pressurised Water Reactors. Their development will continue throughout the world but it will be based upon the lessons learned from that unfortunate accident. In the United Kingdom there is a public enquiry discussing all aspects of the reactor. The papers given in this book provide an informed addition to the literature. The design, safety and licensing and construction of a pressurised water reactor system are discussed in detail. Considerations stemming from the Three Mile Island accident are presented

  19. Effect of water impurities on stress corrosion cracking in a boiling water reactor

    International Nuclear Information System (INIS)

    Ljungbery, L.G.; Cubicciotti, D

    1985-01-01

    A series of stress corrosion tests, including corrosion potential and water chemistry measurements, has been performed in the Swedish Ringhals-1 boiling water reactor. Tests have been run under reactor start-up and reactor power operation with normal reactor water conditions and with alternate water chemistry in which hydrogen is added to the feedwater to suppress stress corrosion cracking. During one alternate water chemistry test, there was significant intergranular corrosion cracking of sensitized stainless specimens. It is shown that nitrate and sulfate, arising from an accidental resin intrusion, are likely causes. Nitrate increases the oxidizing power of the water, and sulfate enhances cracking under oxidizing conditions. During another test under start-up conditions, enhanced transgranular stress corrosion cracking in low alloy steels and possibly initiation of cracking in a nickel base alloy was observed as a result of resin intrusion into the reactor water. The intrusion produced acid and sulfate, which are believed to enhance hydrogen cracking conditions

  20. Alternative water injection device to reactor equipment facility

    International Nuclear Information System (INIS)

    Yamashita, Masahiro.

    1995-01-01

    The device of the present invention injects water to the reactor and the reactor container continuously for a long period of time for preventing occurrence of a severe accident in a BWR type reactor and maintaining the integrity of the reactor container even if the accident should occur. Namely, diesel-driven pumps disposed near heat exchangers of a reactor after-heat removing system (RHR) are operated before the reactor is damaged by the after heat to cause reactor melting. A sucking valve disposed to a pump sucking pipeline connecting a secondary pipeline of the RHR heat exchanger and the diesel driving pump is opened. A discharge valve disposed to a pump discharge pipeline connecting a primary pipeline of the RHR heat exchanger and the diesel driving pump is opened. With such procedures, sea water is introduced from a sea water taking port through the top end of the secondary pipeline of the RHR heat exchanger and water is injected into the inside of the pressure vessel or the reactor container by way of the primary pipeline of the RHR heat exchanger. As a result, the reactor core is prevented from melting even upon occurrence of a severe accident. (I.S.)

  1. Development of light water reactors and subjects for hereafter

    International Nuclear Information System (INIS)

    Murao, Yoshio

    1995-01-01

    As for light water reactors, the structure is relatively simple, and the power plants of large capacity can be realized easily, therefore, they have been used for long period as main nuclear reactors. During that period, the accumulation of experiences on the design, manufacture, operation, maintenance and regulation of light water has become enormous, and in Japan, the social base for maintaining and developing light water reactor technologies has been prepared sufficiently. If the nuclear power generation using seawater uranium is considered, the utilization of uranium for light water reactor technologies can become the method of producing the own energy for Japan. As the factors that threaten the social base of light water reactor technologies, there are a the lowering of the desire to promote light water reactors, the effect of secular deterioration, the price rise of uranium resources, the effect of plutonium accumulation, the effect of the circumstances in developing countries and the sure recruiting of engineers. The construction and the principle of working of light water reactors and the development of light water reactors hereafter, for example, the improvement on small scale and the addition of new technology resulting in cost reduction and the lowering of the quality requirement for engineers, the improvement of core design, the countermeasures by design to serious accidents and others are described. (K.I.)

  2. To the analysis of reactor noise in boiling water reactors

    International Nuclear Information System (INIS)

    Seifritz, W.

    1972-01-01

    The paper contains some basic thoughts on the problem of neutron flux oscillations in power reactors. The advantages of self-powered detectors and their function are explained. In addition, noise measurements of the boiling water reactors at Lingen and Holden are described, and the possibilities of an employment of vanadium detectors for the analysis of reactor noise are discussed. The final pages of the paper contain a complete list of the author's publications in the field of reactor noise analysis. (RW/AK) [de

  3. Quality surveillance experience of PHWR fuel

    International Nuclear Information System (INIS)

    Kulkarni, P.G.; Bandyopadhyay, A.K.; Shah, B.K.

    1997-01-01

    Quality Surveillance activities are being carried out for PHWR fuel for over 25 years in India. A large number of fuel bundles of 19 element design have been produced and successfully irradiated. The quality surveillance practices follow the guidelines given in various Quality Assurance Codes and Guides. An independent third party surveillance is provided to cover major manufacturing and quality control operations. A system of design basis review periodic quality audit and regulatory safety review is in place. Over the years there have been modifications in the quality assurance procedures to comply with changing requirements. Also many innovative improvements have been introduced in the manufacturing procedures. Similarly quality control activities are also modified. Developments in fuel has remained a continuous activity. The paper summarizes the experience gathered over many years in this exciting process of innovation and improvement. (author)

  4. Emergency cooling of presurized water reactor

    International Nuclear Information System (INIS)

    Sykora, D.

    1981-01-01

    The method described of emergency core cooling in the pressurized water reactor is characterized by the fact that water is transported to the disturbed primary circuit or direct to the reactor by the action of the energy and mass of the steam and/or liquid phase of the secondary circuit coolant, which during emergency core cooling becomes an emergency cooling medium. (B.S.)

  5. Materials for advanced water cooled reactors

    International Nuclear Information System (INIS)

    1992-09-01

    The current IAEA programme in advanced nuclear power technology promotes technical information exchange between Member States with major development programmes. The International Working Group on Advanced Technologies for Water Cooled Reactors recommended to organize a Technical Committee Meeting for the purpose of providing an international forum for technical specialists to review and discuss aspects regarding development trends in material application for advanced water cooled reactors. The experience gained from the operation of current water cooled reactors, and results from related research and development programmes, should be the basis for future improvements of material properties and applications. This meeting enabled specialists to exchange knowledge about structural materials application in the nuclear island for the next generation of nuclear power plants. Refs, figs, tabs

  6. Composition and concentration of soluble and particulate matter in the coolant of the reactor primary cooling system of the Embalse nuclear power plant; Composicion y concentracion del material soluble y particulado en el refrigerante del SPTC de la central nuclear Embalse

    Energy Technology Data Exchange (ETDEWEB)

    Chocron, Mauricio; Garcia Rodenas, Luis; La Gamma, Ana M; Villegas, Marina [Comision Nacional de Energia Atomica, General San Martin (Argentina). Dept. de Quimica; Fernandez, Alberto N; Allemandi, Walter; Manera, Raul; Rosales, Hugo [Nucleoelectrica Argentina SA (NASA), Embalse (Argentina). Central Nuclear Embalse

    2000-07-01

    Nuclear power plants type PWR and PHWR (pressurized water reactor and pressurized heavy water reactor) have three coolant circuits which only exchange energy among them. The primary circuit, whose coolant extracts the reactor energy, the secondary circuit or water-steam cycle and the tertiary circuit which could be lake, river or sea water. The chemistry of the primary and secondary coolants is carefully controlled with the aim of minimizing the corrosion of structural materials. However, very low rates of corrosion are inevitable and one of the consequences of the corrosion processes is the presence of soluble and particulate matter in the coolant from where several problems associated with mass transfer arisen. In this way radioactive nuclides are transported out of the core to the steam generators, hydraulic resistance increases and heat transfer capability degrades. In the present paper some alternative techniques are proposed for the quantification of both, the particulate and soluble matter present in the coolant and their correspondent composition. Some results are also included and discussed. (author)

  7. Light and heavy water replacing system in reactor container

    International Nuclear Information System (INIS)

    Miyamoto, Keiji.

    1979-01-01

    Purpose: To enable to determine the strength of a reactor container while neglecting the outer atmospheric pressure upon evacuation, by evacuating the gap between the reactor container and a biological thermal shield, as well as the container simultaneously upon light water - heavy water replacement. Method: Upon replacing light water with heavy water by vacuum evaporation system in a nuclear reactor having a biological thermal shield surrounding the reactor container incorporating therein a reactor core by way of a heat expansion absorbing gap, the reactor container and the havy water recycling system, as well as the inside of heat expansion absorbing gap are evacuated simultaneously. This enables to neglect the outer atmospheric outer pressure upon evacuation in the determination of the container strength, and the thickness of the container can be decreased by so much as the external pressure neglected. (Moriyama, K.)

  8. Modelling of oxidation and hydriding behaviour of Zircaloy-2 pressure tubes in PHWR

    International Nuclear Information System (INIS)

    Sah, D.N.; Sunil Kumar; Khan, K.B.

    2002-01-01

    A computer model named DOCTOR (Deuteriding of Coolant Tubes during Operation of Reactor) has been developed for predicting the axial profile of oxide thickness and hydrogen (Deuterium) concentration in PHWR pressure tubes. This model is applicable to single channel or full core analysis. The main source of hydrogen is considered to be oxidation of pressure tube on the i.d. surface by high temperature coolant water. Three stages of oxidation is considered namely, pre- transition, post transition and accelerated. Oxidation rate is considered to be dependent on channel power, axial power/flux distribution, coolant temperature and pre-existing oxide thickness at the location. The kinetics parameters for oxidation model are derived from the actual measurement of oxide thickness on a number of pressure tubes examined in PIE Division. The input data required for the model are: channel power, channel power factor, axial flux distribution, coolant inlet temperature, critical oxide thickness, hydrogen pick up fraction, initial hydrogen in the material and time of operation (efpy). The model calculates the oxide layer thickness on the inside surface of the pressure tube along the length. The amount of hydrogen picked up by the pressure tube is calculated from the oxide thickness using hydrogen pick up fraction determined from the PIE data. The pressure tube length is divided into a number of axial segments for calculation. The temperature and fast neutron flux assumed to be constant in a given segment. The axial temperature profile calculated from the axial power profile in the channel is used for calculating the oxidation rate at various locations in the pressure tube. The model has been validated with PIE data of hydrogen equivalent measurement on a number of irradiated Zircaloy-2 pressure tubes of various PHWRs. The performance of the model in predicting the axial profile of hydrogen in the pressure tubes has been found to be good. (author)

  9. PHWR fuel fabrication with imported uranium - procedures and processes

    International Nuclear Information System (INIS)

    Rao, R.V.R.L.V.; Rameswara Rao, A.; Hemantha Rao, G.V.S.; Jayaraj, R.N.

    2010-01-01

    Following the 123 agreement and subsequent agreements with IAEA & NSG, Government of India has entered into bilateral agreements with different countries for nuclear trade. Department of Atomic Energy (DAE), Government of India, has entered into contract with few countries for supply of uranium material for use in the safeguarded PHWRs. Nuclear Fuel Complex (NFC), an industrial unit of DAE, established in the early seventies, is engaged in the production of Nuclear Fuel and Zircaloy items required for Nuclear Power Reactors operating in the country. NFC has placed one of its fuel fabrication facilities (NFC, Block-A, INE-) under safeguards. DAE has opted to procure uranium material in the form of ore concentrate and fuel pellets. Uranium ore concentrate was procured as per the ASTM specifications. Since no international standards are available for PHWR fuel pellets, Specifications have to be finalized based on the present fabrication and operating experience. The process steps have to be modified and fine tuned for handling the imported uranium material especially for ore concentrate. Different transportation methods are to be employed for transportation of uranium material to the facility. Cost of the uranium material imported and the recoveries at various stages of fuel fabrication have impact on the fuel pricing and in turn the unit energy costs. Similarly the operating procedures have to be modified for safeguards inspections by IAEA. NFC has successfully manufactured and supplied fuel bundles for the three 220 MWe safeguarded PHWRs. The paper describes various issues encountered while manufacturing fuel bundles with different types of nuclear material. (author)

  10. Thorium in heavy water reactors

    International Nuclear Information System (INIS)

    Andersson, G.

    1984-12-01

    Advanced heavy water reactors can provide energy on a global scale beyond the foreseeable future. Their economic and safety features are promising: 1. The theoretical feasibility of the Self Sufficient Equilibrium Thorium (SSET) concept is confirmed by new calculations. Calculations show that the adjuster rod geometry used in natural uranium CANDU reactors is adequate also for SSET if the absorption in the rods is graded. 2. New fuel bundle designs can permit substantially higher power output from a CANDU reactor. The capital cost for fuel, heavy water and mechanical equipment can thereby be greatly reduced. Progress is possible with the traditional fuel material oxide, but the use of thorium metal gives much larger effects. 3. A promising long range possibility is to use pressure tanks instead of pressure tubes. Heat removal from the core is facilitated. Negative temperature and void coefficients provide inherent safety features. Refuelling under power is no longer needed if control by moderator displacement is used. Reduced quality demand on the fuel permits lower fuel costs. The neutron economy is improved by the absence of pressure and clandria tubes and also by the use of radial and axial blankets. A modular seed blanket design can reduce the Pa losses. The experience from construction of tank designs is good e.g. AAgesta, Attucha. It is now also possible to utilize technology from LWR reactors and the implementation of advanced heavy water reactors would thus be easier than HTR or LMFBR systems. (Author)

  11. A review of boiling water reactor water chemistry: Science, technology, and performance

    International Nuclear Information System (INIS)

    Fox, M.J.

    1989-02-01

    Boiling water reactor (BWR) water chemistry (science, technology, and performance) has been reviewed with an emphasis on the relationships between BWR water quality and corrosion fuel performance, and radiation buildup. A comparison of Nuclear Regulatory Commission (NRC) Regulatory Guide 1.56, the Boiling Water Reactor Owners Group (BWROG) Water Chemistry Guidelines, and Plant Technical Specifications showed that the BWROG Guidelines are more stringent than the NRC Regulatory Guide, which is almost identical to Plant Technical Specifications. Plant performance with respect to BWR water chemistry has shown dramatic improvements in recent years. Up until 1979 BWRs experienced an average of 3.0 water chemistry incidents per reactor-year. Since 1979 the water chemistry technical specifications have been violated an average of only 0.2 times per reactor-year, with the most recent data from 1986-1987 showing only 0.05 violations per reactor-year. The data clearly demonstrate the industry-wide commitment to improving water quality in BWRs. In addition to improving water quality, domestic BWRs are beginning to switch to hydrogen water chemistry (HWC), a remedy for intergranular stress corrosion cracking. Three domestic BWRs are presently operating on HWC, and fourteen more have either performed HWC mini tests or are in various stages of HWC implementation. This report includes a detailed review of HWC science and technology as well as areas in which further research on BWR chemistry may be needed. 43 refs., 30 figs., 8 tabs

  12. Fuel cycle options for light water reactors and heavy water reactors. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    1999-11-01

    In the second half of the 20th century nuclear power has evolved from the research and development environment to an industry that supplies 16% of the world's electricity. By the end of 1997, over 8500 reactor-years of operating experience had been accumulated. Global environmental change, and the continuing increase in global energy supply required to provide increasing populations with an improving standard of living, make the contribution from nuclear energy even more important for the next century. For nuclear power to achieve its full potential and make its needed contribution, it must be safe, economical, reliable and sustainable. All of these factors can be enhanced by judicious choice and development of advanced fuel cycle options. The Technical Committee Meeting (TCM) on Fuel Cycle Options for Light Water Reactors and Heavy Water Reactors was hosted by Atomic Energy of Canada Limited (AECL) on behalf of the Canadian Government and was jointly conducted within the frame of activities of the IAEA International Working Group on Advanced Technologies for Light Water Reactors (IWG-LWR) and the IAEA International Working Group on Advanced Technologies for Heavy Water Reactors (IWG-HWR). The TCM provided the opportunity to have in-depth discussions on important technical topics which were highlighted in the International Symposium on Nuclear Fuel Cycle and Reactor Strategies: Adjusting to New Realities, held in Vienna, 3-6 June 1997. The main results and conclusions of the TCM were presented as input for discussion at the first meeting of the IAEA newly formed International Working Group on Fuel Cycle Options

  13. TA-2 Water Boiler Reactor Decommissioning Project

    International Nuclear Information System (INIS)

    Durbin, M.E.; Montoya, G.M.

    1991-06-01

    This final report addresses the Phase 2 decommissioning of the Water Boiler Reactor, biological shield, other components within the biological shield, and piping pits in the floor of the reactor building. External structures and underground piping associated with the gaseous effluent (stack) line from Technical Area 2 (TA-2) Water Boiler Reactor were removed in 1985--1986 as Phase 1 of reactor decommissioning. The cost of Phase 2 was approximately $623K. The decommissioning operation produced 173 m 3 of low-level solid radioactive waste and 35 m 3 of mixed waste. 15 refs., 25 figs., 3 tabs

  14. Reactor performance calculations for water reactors

    International Nuclear Information System (INIS)

    Hicks, D.

    1970-04-01

    The principles of nuclear, thermal and hydraulic performance calculations for water cooled reactors are discussed. The principles are illustrated by describing their implementation in the UKAEA PATRIARCH scheme of computer codes. This material was originally delivered as a course of lectures at the Technical University of Helsinki in Summer of 1969.

  15. Grey water treatment in UASB reactor at ambient temperature.

    Science.gov (United States)

    Elmitwalli, T A; Shalabi, M; Wendland, C; Otterpohl, R

    2007-01-01

    In this paper, the feasibility of grey water treatment in a UASB reactor was investigated. The batch recirculation experiments showed that a maximum total-COD removal of 79% can be obtained in grey-water treatment in the UASB reactor. The continuous operational results of a UASB reactor treating grey water at different hydraulic retention time (HRT) of 20, 12 and 8 hours at ambient temperature (14-24 degrees C) showed that 31-41% of total COD was removed. These results were significantly higher than that achieved by a septic tank (11-14%), the most common system for grey water pre-treatment, at HRT of 2-3 days. The relatively lower removal of total COD in the UASB reactor was mainly due to a higher amount of colloidal COD in the grey water, as compared to that reported in domestic wastewater. The grey water had a limited amount of nitrogen, which was mainly in particulate form (80-90%). The UASB reactor removed 24-36% and 10-24% of total nitrogen and total phosphorus, respectively, in the grey water, due to particulate nutrients removal by physical entrapment and sedimentation. The sludge characteristics of the UASB reactor showed that the system had stable performance and the recommended HRT for the reactor is 12 hours.

  16. Water and Regolith Shielding for Surface Reactor Missions

    Science.gov (United States)

    Poston, David I.; Ade, Brian J.; Sadasivan, Pratap; Leichliter, Katrina J.; Dixon, David D.

    2006-01-01

    This paper investigates potential shielding options for surface power fission reactors. The majority of work is focused on a lunar shield that uses a combination of water in stainless-steel cans and lunar regolith. The major advantage of a water-based shield is that development, testing, and deployment should be relatively inexpensive. This shielding approach is used for three surface reactor concepts: (1) a moderated spectrum, NaK cooled, Hastalloy/UZrH reactor, (2) a fast-spectrum, NaK-cooled, SS/UO2 reactor, and (3) a fast-spectrum, K-heat-pipe-cooled, SS/UO2 reactor. For this study, each of these reactors is coupled to a 25-kWt Stirling power system, designed for 5 year life. The shields are designed to limit the dose both to the Stirling alternators and potential astronauts on the surface. The general configuration used is to bury the reactor, but several other options exist as well. Dose calculations are presented as a function of distance from reactor, depth of buried hole, water boron concentration (if any), and regolith repacked density.

  17. Water and Regolith Shielding for Surface Reactor Missions

    International Nuclear Information System (INIS)

    Poston, David I.; Sadasivan, Pratap; Dixon, David D.; Ade, Brian J.; Leichliter, Katrina J.

    2006-01-01

    This paper investigates potential shielding options for surface power fission reactors. The majority of work is focused on a lunar shield that uses a combination of water in stainless-steel cans and lunar regolith. The major advantage of a water-based shield is that development, testing, and deployment should be relatively inexpensive. This shielding approach is used for three surface reactor concepts: (1) a moderated spectrum, NaK cooled, Hastalloy/UZrH reactor, (2) a fast-spectrum, NaK-cooled, SS/UO2 reactor, and (3) a fast-spectrum, K-heat-pipe-cooled, SS/UO2 reactor. For this study, each of these reactors is coupled to a 25-kWt Stirling power system, designed for 5 year life. The shields are designed to limit the dose both to the Stirling alternators and potential astronauts on the surface. The general configuration used is to bury the reactor, but several other options exist as well. Dose calculations are presented as a function of distance from reactor, depth of buried hole, water boron concentration (if any), and regolith repacked density

  18. Thermohydraulic relationships for advanced water cooled reactors

    International Nuclear Information System (INIS)

    2001-04-01

    This report was prepared in the context of the IAEA's Co-ordinated Research Project (CRP) on Thermohydraulic Relationships for Advanced Water Cooled Reactors, which was started in 1995 with the overall goal of promoting information exchange and co-operation in establishing a consistent set of thermohydraulic relationships which are appropriate for use in analyzing the performance and safety of advanced water cooled reactors. For advanced water cooled reactors, some key thermohydraulic phenomena are critical heat flux (CHF) and post CHF heat transfer, pressure drop under low flow and low pressure conditions, flow and heat transport by natural circulation, condensation of steam in the presence of non-condensables, thermal stratification and mixing in large pools, gravity driven reflooding, and potential flow instabilities. The objectives of the CRP are (1) to systematically list the requirements for thermohydraulic relationships in support of advanced water cooled reactors during normal and accident conditions, and provide details of their database where possible and (2) to recommend and document a consistent set of thermohydraulic relationships for selected thermohydraulic phenomena such as CHF and post-CHF heat transfer, pressure drop, and passive cooling for advanced water cooled reactors. Chapter 1 provides a brief discussion of the background for this CRP, the CRP objectives and lists the participating institutes. Chapter 2 provides a summary of important and relevant thermohydraulic phenomena for advanced water cooled reactors on the basis of previous work by the international community. Chapter 3 provides details of the database for critical heat flux, and recommends a prediction method which has been established through international co-operation and assessed within this CRP. Chapter 4 provides details of the database for film boiling heat transfer, and presents three methods for predicting film boiling heat transfer coefficients developed by institutes

  19. Thermohydraulic relationships for advanced water cooled reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-04-01

    This report was prepared in the context of the IAEA's Co-ordinated Research Project (CRP) on Thermohydraulic Relationships for Advanced Water Cooled Reactors, which was started in 1995 with the overall goal of promoting information exchange and co-operation in establishing a consistent set of thermohydraulic relationships which are appropriate for use in analyzing the performance and safety of advanced water cooled reactors. For advanced water cooled reactors, some key thermohydraulic phenomena are critical heat flux (CHF) and post CHF heat transfer, pressure drop under low flow and low pressure conditions, flow and heat transport by natural circulation, condensation of steam in the presence of non-condensables, thermal stratification and mixing in large pools, gravity driven reflooding, and potential flow instabilities. The objectives of the CRP are (1) to systematically list the requirements for thermohydraulic relationships in support of advanced water cooled reactors during normal and accident conditions, and provide details of their database where possible and (2) to recommend and document a consistent set of thermohydraulic relationships for selected thermohydraulic phenomena such as CHF and post-CHF heat transfer, pressure drop, and passive cooling for advanced water cooled reactors. Chapter 1 provides a brief discussion of the background for this CRP, the CRP objectives and lists the participating institutes. Chapter 2 provides a summary of important and relevant thermohydraulic phenomena for advanced water cooled reactors on the basis of previous work by the international community. Chapter 3 provides details of the database for critical heat flux, and recommends a prediction method which has been established through international co-operation and assessed within this CRP. Chapter 4 provides details of the database for film boiling heat transfer, and presents three methods for predicting film boiling heat transfer coefficients developed by institutes

  20. A review of the UKAEA interest in heavy water reactors

    International Nuclear Information System (INIS)

    Symes, R.J.

    1983-01-01

    The chapter commences with a brief account of the history of heavy water production and then begins the story of the British use of this moderator in power reactors. This is equated with the introduction and development of the tube reactor as a distinct and important form of reactor construction in contrast with the perhaps better known vessel design that has tended to dominate reactor engineering to date. The account thus includes a succession of reactor designs including the gas and steam cooled heavy water systems in addition to the steam-generating heavy water reactor. The SGHWR was demonstrated by the construction of a substantial prototype, which continues in operation as a flexible and reliable electricity-generating plant. It was also, for a time, identified as the system to be used for Britain's third reactor programme. Today the successful Canadian CANDU power reactors represent the only penetration of heavy water reactor technology into large scale electricity generation. The range of research and experimental reactors using heavy water in their cores is reviewed. (author)

  1. Improvement of Severe Accident Analysis Computer Code and Development of Accident Management Guidance for Heavy Water Reactor

    International Nuclear Information System (INIS)

    Park, Soo Yong; Kim, Ko Ryu; Kim, Dong Ha; Kim, See Darl; Song, Yong Mann; Choi, Young; Jin, Young Ho

    2005-03-01

    The objective of the project is to develop a generic severe accident management guidance(SAMG) applicable to Korean PHWR and the objective of this 3 year continued phase is to construct a base of the generic SAMG. Another objective is to improve a domestic computer code, ISAAC (Integrated Severe Accident Analysis code for CANDU), which still has many deficiencies to be improved in order to apply for the SAMG development. The scope and contents performed in this Phase-2 are as follows: The characteristics of major design and operation for the domestic Wolsong NPP are analyzed from the severe accident aspects. On the basis, preliminary strategies for SAM of PHWR are selected. The information needed for SAM and the methods to get that information are analyzed. Both the individual strategies applicable for accident mitigation under PHWR severe accident conditions and the technical background for those strategies are developed. A new version of ISAAC 2.0 has been developed after analyzing and modifying the existing models of ISAAC 1.0. The general SAMG applicable for PHWRs confirms severe accident management techniques for emergencies, provides the base technique to develop the plant specific SAMG by utility company and finally contributes to the public safety enhancement as a NPP safety assuring step. The ISAAC code will be used inevitably for the PSA, living PSA, severe accident analysis, SAM program development and operator training in PHWR

  2. Improvement of Severe Accident Analysis Computer Code and Development of Accident Management Guidance for Heavy Water Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Park, Soo Yong; Kim, Ko Ryu; Kim, Dong Ha; Kim, See Darl; Song, Yong Mann; Choi, Young; Jin, Young Ho

    2005-03-15

    The objective of the project is to develop a generic severe accident management guidance(SAMG) applicable to Korean PHWR and the objective of this 3 year continued phase is to construct a base of the generic SAMG. Another objective is to improve a domestic computer code, ISAAC (Integrated Severe Accident Analysis code for CANDU), which still has many deficiencies to be improved in order to apply for the SAMG development. The scope and contents performed in this Phase-2 are as follows: The characteristics of major design and operation for the domestic Wolsong NPP are analyzed from the severe accident aspects. On the basis, preliminary strategies for SAM of PHWR are selected. The information needed for SAM and the methods to get that information are analyzed. Both the individual strategies applicable for accident mitigation under PHWR severe accident conditions and the technical background for those strategies are developed. A new version of ISAAC 2.0 has been developed after analyzing and modifying the existing models of ISAAC 1.0. The general SAMG applicable for PHWRs confirms severe accident management techniques for emergencies, provides the base technique to develop the plant specific SAMG by utility company and finally contributes to the public safety enhancement as a NPP safety assuring step. The ISAAC code will be used inevitably for the PSA, living PSA, severe accident analysis, SAM program development and operator training in PHWR.

  3. An improved water cooled nuclear reactor and pressuriser assembly

    International Nuclear Information System (INIS)

    Gardner, F.J.; Strong, R.

    1991-01-01

    A water cooled nuclear reactor is described which comprises a reactor core, a primary water coolant circuit and a pressuriser arranged as an integral unit in a pressure vessel. The pressure vessel is divided into an upper and a lower chamber by a casing. The reactor core and primary water coolant circuit are arranged in the lower chamber and the pressuriser is arranged in the upper chamber. A plurality of spray pipes interconnect a steam space of the pressuriser with the downcomer of the primary water coolant circuit below a heat exchanger. A plurality of surge ports interconnect a water space of the pressuriser with the primary water coolant circuit. The surge ports have hydraulic diodes so that there is a low flow resistance for water from the water space of the pressuriser to the primary water coolant circuit and high flow resistance in the opposite direction. The spray pipes provide a desuperheating spray of cooled water into the pressuriser during positive volume surges of the primary water coolant. The pressuriser arrangement may also be applied to integral water cooled reactors with separate pressurisers and to dispersed pressurised water reactors. The surge ports also allow water to flow by gravity to the core in an emergency. (author)

  4. Validation of the mathematical model of the NAPS PHT system flow with test data

    International Nuclear Information System (INIS)

    Rajesh Kumar, K.; Vani, K.; Chakraborty, G.; Venkat Raj, V.

    1994-01-01

    A dynamic analysis code to predict the time dependent behaviour of the reactor coolant system flow following the tripping and starting of Primary Circulating Pumps in the different operating modes has been developed for Indian Pressurised Heavy Water Reactor (PHWR) type power plants. The model is comprised of reactor coolant momentum equation, Primary Heat Transport (PHT) pump dynamic equation and pump characteristics. This model forms one of the modules of the integrated system code being developed for transient analysis of 220 MWe PHWR power plants. The Narora Atomic Power Station (NAPS) PHT system flow transient results for different combinations of pump operation predicted by the model have been compared with the experimental data obtained from a test carried out in NAPS-2 for validation of the model. The predicted results are in good agreement with the experimental data. (author). 3 refs., 5 figs

  5. Pressurized water reactor simulator. Workshop material. 2. ed

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has established an activity in nuclear reactor simulation computer programs to assist its Member States in education. The objective is to provide, for a variety of advanced reactor types, insight and practice in their operational characteristics and their response to perturbations and accident situations. To achieve this, the IAEA arranges for the development and distribution of simulation programs and educational material and sponsors courses and workshops. The workshops are in two parts: techniques and tools for reactor simulator development. And the use of reactor simulators in education. Workshop material for the first part is covered in the IAEA Training Course Series No. 12, 'Reactor Simulator Development' (2001). Course material for workshops using a WWER- 1000 reactor department simulator from the Moscow Engineering and Physics Institute, the Russian Federation is presented in the IAEA Training Course Series No. 21, 2nd edition, 'WWER-1000 Reactor Simulator' (2005). Course material for workshops using a boiling water reactor simulator developed for the IAEA by Cassiopeia Technologies Incorporated of Canada (CTI) is presented in the IAEA publication: Training Course Series No.23, 2nd edition, 'Boiling Water Reactor Simulator' (2005). This report consists of course material for workshops using a pressurized water reactor simulator

  6. Core design concepts for high performance light water reactors

    International Nuclear Information System (INIS)

    Schulenberg, T.; Starflinger, J.

    2007-01-01

    Light water reactors operated under supercritical pressure conditions have been selected as one of the promising future reactor concepts to be studied by the Generation IV International Forum. Whereas the steam cycle of such reactors can be derived from modern fossil fired power plants, the reactor itself, and in particular the reactor core, still need to be developed. Different core design concepts shall be described here to outline the strategy. A first option for near future applications is a pressurized water reactor with 380 .deg. C core exit temperature, having a closed primary loop and achieving 2% pts. higher net efficiency and 24% higher specific turbine power than latest pressurized water reactors. More efficiency and turbine power can be gained from core exit temperatures around 500 .deg. C, which require a multi step heat up process in the core with intermediate coolant mixing, achieving up to 44% net efficiency. The paper summarizes different core and assembly design approaches which have been studied recently for such High Performance Light Water Reactors

  7. Nuclear reactor in deep water

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Events during October 1980, when the Indian Point 2 nuclear reactor was flooded by almost 500 000 litres of water from the Hudson river, are traced and the jumble of human errors and equipment failures chronicled. Possible damage which could result from the reactor getting wet and from thermal shock are considered. (U.K.)

  8. Heat insulation device for reactor pressure vessel in water

    International Nuclear Information System (INIS)

    Nakamura, Heiichiro; Tanaka, Yoshimi.

    1993-01-01

    Outer walls of a reactor pressure vessel are covered with water-tight walls made of metals. A heat insulation metal material is disposed between them. The water tight walls are joined by welding and flanges. A supply pipeline for filling gases and a discharge pipeline are in communication with the inside of the water tight walls. Further, a water detector is disposed in the midway of the gas discharge pipeline. With such a constitution, the following advantages can be attained. (1) Heat transfer from the reactor pressure vessel to water of a reactor container can be suppressed by filled gases and heat insulation metal material. (2) Since the pressure at the inside of the water tight walls can be equalized with the pressure of the inside of the reactor container, the thickness of the water-tight walls can be reduced. (3) Since intrusion of water to the inside of the walls due to rupture of the water tight walls is detected by the water detector, reactor scram can be conducted rapidly. (4) The sealing property of the flange joint portion is sufficient and detaching operation thereof is easy. (I.S.)

  9. Safety aspects of pressurised water reactors

    International Nuclear Information System (INIS)

    1985-01-01

    This submission to the Health and Safety Executive has been prepared by the Institution of Professional Civil Servants (IPCS) as a contribution to the debate on safety aspects associated with Pressurized Water Reactors (PWRs). Although supporting an energy policy which includes the development of nuclear power, assurances are sought on a number of safety issues if it is decided that this should be generated by a PWR-type reactor. These issues are listed. In particular the following are mentioned: the wider publication of design information, the use of elastic-plastic fracture mechanics as the basis for determining pressure vessel integrity, the failure rate of steam generating units, water coolant quality control, greater investigation of two-phase flow accident conditions, the components of the reactor cooling system and training of reactor personnel in the understanding of LOCA effects. (U.K.)

  10. Short-term storage considerations for spent plutonium-thorium fuel bundles

    Energy Technology Data Exchange (ETDEWEB)

    Blomeley, L.; Dugal, C.; Masala, E.; Tran, T., E-mail: laura.blomeley@cnl.ca [Canadian Nuclear Laboratories, Chalk River, Ontario (Canada)

    2015-12-15

    To support the development of advanced pressurized heavy water reactor (PHWR) fuel cycles, it is necessary to study short-term storage solutions for spent reactor fuel. In this paper, some representational criticality safety and shielding assessments are presented for a particular PHWR plutonium-thorium based fuel bundle concept in a hypothetical aboveground dry storage module. The criticality assessment found that the important parameters for the storage design are neutron absorber content and fuel composition, particularly in light of the high sensitivity of code results to plutonium. The shielding assessment showed that the shielding as presented in the paper would need to be redesigned to provide greater gamma attenuation. These findings can be used to aid in designing fuel storage facilities. (author)

  11. Device for controlling water supply to nuclear reactor

    International Nuclear Information System (INIS)

    Iwasaki, Toshio.

    1974-01-01

    Object: To smoothly control automatic water supply for realizing stable operation of a nuclear reactor by providing a flow rate limiting signal selection circuit and a preferential circuit in a water supply control device for a nuclear reactor wherein the speed of a recirculation pump may be changed in two-steps. Structure: Opening angle signals for a water supply regulating valve are controlled by a nuclear reactor water level signal, a vapor flow rate signal and a supplied water flow rate signal through an adder and an adjuster in response to a predetermined water level setting signal. When the water in the reactor is maintained at a predetermined level, a selection circuit receives a water pump condition signal for selecting one of the signals from a supplied water rate limiting signal generator generating signals for indicating whether one or two water supply pumps are operated. A low value preferential circuit passes the lower of the values generated from the selection circuit and the adder. The selection circuit receives a recirculation pump condition signal and selects either one of the signals from the supplied water flow rate limiting signal generator operated at high speed or low speed. A high value preferential circuit passes the higher value

  12. Radiological consequence analyses of loss of coolant accidents of various break sizes of Pressurized Heavy Water Reactor

    International Nuclear Information System (INIS)

    Sanyasi Rao, V.V.S.; Hari Prasad, M.; Ghosh, A.K.

    2010-01-01

    For any advanced technology, it is essential to ensure that the consequences associated with the accident sequences arising, if any, from the operation of the plant are as low as possible and certainly below the guidelines/limits set by the regulatory bodies. Nuclear power is no exception to this. In this paper consequences of the events arising from Loss of Coolant Accident (LOCA) sequences in Pressurized Heavy Water Reactor (PHWR), are analysed. The sequences correspond to different break sizes of LOCA followed by the operation or otherwise of Emergency Core Cooling System (ECCS). Operation or otherwise of the containment safety systems has also been considered. It has been found that there are no releases to the environment when ECCS is available. The releases, when ECCS is not available, arise from the slack and the ground. The radionuclides considered include noble gases, iodine, and cesium. The hourly meteorological parameters (wind speed, wind direction, precipitation and stability category), considered for this study, correspond to those of Kakrapar site. The consequences evaluated are the thyroid dose and the bone marrow dose received by a person located at various distances from the release point. Isodose curves are generated. From these evaluations, it has been found that the doses are very low. The complementary cumulative frequency distributions (CCFD) for thyroid and bone marrow doses have also been presented for the cases analysed. (author)

  13. Auxiliary equipment for cooling water in a reactor

    International Nuclear Information System (INIS)

    Konno, Yasuhiro; Sakairi, Toshiaki.

    1975-01-01

    Object: To effectively make use of pressure energy of reactor water, which has heretofore been discarded, to enable supply of emergency power supply of high reliability and to prevent spreading of environmental contamination. Structure: Sea water pumped by a sea water supply pump is fed to a heat exchanger. Reactor water carried through piping on the side to be cooled is removed in heat by the heat exchanger to be cooled and returned, and then again returned to the reactor. On the other hand, sea water heated by the heat exchanger is fed to a water wheel to drive the water wheel, after which it is discharged into a discharging path. A generator may be directly connected to the water wheel to use the electricity generated by the generator as the emergency power source. (Kamimura, M.)

  14. A PHWR with slightly enriched uranium about the first core

    International Nuclear Information System (INIS)

    Notari, C.

    1997-01-01

    Many different studies have been performed in Argentina regarding the use of slightly enriched uranium in the PHWR nuclear plants. These referred mainly to operating plants so that a transition had to be considered from the present natural uranium fuel cycle to the slightly enriched one. In this analysis, technical and economical arguments are presented which favor the use of a natural uranium initial core. The levelized fuel costs are shown to be practically insensitive to the first core and a fast transition is more influential than an initially enriched core. (author)

  15. Pellet-Cladding Mechanical Interaction Failure Threshold for Reactivity Initiated Accidents for Pressurized Water Reactors and Boiling Water Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Beyer, Carl E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geelhood, Kenneth J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-06-01

    Pacific Northwest National Laboratory (PNNL) has been requested by the U.S. Nuclear Regulatory Commission to evaluate the reactivity initiated accident (RIA) tests that have recently been performed in the Nuclear Safety Research Reactor (NSRR) and CABRI (French research reactor) on uranium dioxide (UO2) and mixed uranium and plutonium dioxide (MOX) fuels, and to propose pellet-cladding mechanical interaction (PCMI) failure thresholds for RIA events. This report discusses how PNNL developed PCMI failure thresholds for RIA based on least squares (LSQ) regression fits to the RIA test data from cold-worked stress relief annealed (CWSRA) and recrystallized annealed (RXA) cladding alloys under pressurized water reactor (PWR) hot zero power (HZP) conditions and boiling water reactor (BWR) cold zero power (CZP) conditions.

  16. Conceptual designing of reduced-moderation water reactor with heavy water coolant

    Energy Technology Data Exchange (ETDEWEB)

    Hibi, Kohki; Shimada, Shoichiro; Okubo, Tsutomu E-mail: okubo@hems.jaeri.go.jp; Iwamura, Takamichi; Wada, Shigeyuki

    2001-12-01

    The conceptual designing of reduced-moderation water reactors, i.e. advanced water-cooled reactors using plutonium mixed-oxide fuel with high conversion ratios more than 1.0 and negative void reactivity coefficients, has been carried out. The core is designed on the concept of a pressurized water reactor with a heavy water coolant and a triangular tight lattice fuel pin arrangement. The seed fuel assembly has an internal blanket region inside the seed fuel region as well as upper and lower blanket regions (i.e. an axial heterogeneous core). The radial blanket fuel assemblies are introduced in a checkerboard pattern among the seed fuel assemblies (i.e. a radial heterogeneous core). The radial blanket region is shorter than the seed fuel region. This study shows that the heavy water moderated core can achieve negative void reactivity coefficients and conversion ratios of 1.06-1.11.

  17. Channel type reactors with supercritical water coolant. Russian experience

    International Nuclear Information System (INIS)

    Kuznetsov, Y.N.; Gabaraev, B.A.

    2003-01-01

    Transition to coolant of supercritical parameters allows for principle engineering-andeconomic characteristics of light-water nuclear power reactors to be substantially enhanced. Russian experience in development of channel-type reactors with supercritical water coolant has demonstrated advantages and practical feasibility of such reactors. (author)

  18. Water chemistry in boiling water reactors - A Leibstadt-specific overview

    International Nuclear Information System (INIS)

    Sarott, F.-A.

    2005-01-01

    The boiling water reactor (BWR) consists of two main water circuits: the water-steam cycle and the main cooling water system. In the introduction, the goals and tasks of the BWR plant chemistry are described. The most important objectives are the prevention of system degradation by corrosion and the minimisation of radiation fields. Then a short description of the BWR operation principle, including the water steam cycle, the transport of various impurities by the steam, removing impurities from the condensate, the reactor water clean-up system, the balance of plant and the main cooling water system, is given. Subsequently, the focus is set on the water-steam cycle chemistry. In order to fulfil the somewhat contradictory requirements, the chemical parameters must be well balanced. This is achieved by the water chemistry control method called 'normal water chemistry'. Other additional methods are used for the solution to different problems. The 'zinc addition method' is applied to reduce high radiation levels around the recirculation loops. The 'hydrogen water chemistry method' and the 'noble metal chemical addition method' are used to protect the reactor core components and piping made of stainless steel against stress corrosion cracking. This phenomenon has been observed for about 40 years and is partly due to the strong oxidising conditions in the BWR water. Both mitigation methods are used by the majority of the BWR plants all over the world (including the two Swiss NPPs Muehleberg and Leibstadt). (author)

  19. Reactor vessel pressure transient protection for pressurized water reactors

    International Nuclear Information System (INIS)

    Zech, G.

    1978-09-01

    During the past few years the NRC has been studying the issue of protection of the reactor pressure vessels at Pressurized Water Reactors (PWRs) from transients when the vessels are at a relatively low temperature. This effort was prompted by concerns related to the safety margins available to vessel damage as a result of such events. Nuclear Reactor Regulation Category A Technical Activity No. A-26 was established to set forth the NRC plan for resolution of the generic aspects of this safety issue. The purpose of the report is to document the completion of this generic technical activity

  20. Electrochemistry of Water-Cooled Nuclear Reactors

    International Nuclear Information System (INIS)

    Dgiby Macdonald; Mirna Urquidi-Macdonald; John Mahaffy; Amit Jain Han Sang Kim; Vishisht Gupta; Jonathan Pitt

    2006-01-01

    This project developed a comprehensive mathematical and simulation model for calculating thermal hydraulic, electrochemical, and corrosion parameters, viz. temperature, fluid flow velocity, pH, corrosion potential, hydrogen injection, oxygen contamination, stress corrosion cracking, crack growth rate, and other important quantities in the coolant circuits of water-cooled nuclear power plants, including both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs). The model is being used to assess the three major operational problems in Pressurized Water Reactors (PWR), which include mass transport, activity transport, and the axial offset anomaly, and provide a powerful tool for predicting the accumulation of SCC damage in BWR primary coolant circuits as a function of operating history. Another achievement of the project is the development of a simulation tool to serve both as a training tool for plant operators and as an engineering test-bed to evaluate new equipment and operating strategies (normal operation, cold shut down and others). The development and implementation of the model allows us to estimate the activity transport or ''radiation fields'' around the primary loop and the vessel, as a function of the operating parameters and the water chemistry

  1. Analysis on small long life reactor using thorium fuel for water cooled and metal cooled reactor types

    International Nuclear Information System (INIS)

    Permana, Sidik

    2009-01-01

    Long-life reactor operation can be adopted for some special purposes which have been proposed by IAEA as the small and medium reactor (SMR) program. Thermal reactor and fast reactor types can be used for SMR and in addition to that program the utilization of thorium fuel as one of the candidate as a 'partner' fuel with uranium fuel which can be considered for optimizing the nuclear fuel utilization as well as recycling spent fuel. Fissile U-233 as the main fissile material for thorium fuel shows higher eta-value for wider energy range compared with other fissile materials of U-235 and Pu-239. However, it less than Pu-239 for fast energy region, but it still shows high eta-value. This eta-value gives the reactor has higher capability for obtaining breeding condition or high conversion capability. In the present study, the comparative analysis on small long life reactor fueled by thorium for different reactor types (water cooled and metal cooled reactor types). Light water and heavy water have been used as representative of water-cooled reactor types, and for liquid metal-cooled reactor types, sodium-cooled and lead-bismuth-cooled have been adopted. Core blanket arrangement as general design configuration, has been adopted which consist of inner blanket region fueled by thorium oxide, and two core regions (inner and out regions) fueled by fissile U-233 and thorium oxide with different percentages of fissile content. SRAC-CITATION and JENDL-33 have been used as core optimization analysis and nuclear data library for this analysis. Reactor operation time can reaches more than 10 years operation without refueling and shuffling for different reactor types and several power outputs. As can be expected, liquid metal cooled reactor types can be used more effective for obtaining long life reactor with higher burnup, higher power density, higher breeding capability and lower excess reactivity compared with water-cooled reactors. Water cooled obtains long life core operation

  2. Water cooled reactor technology: Safety research abstracts no. 1

    International Nuclear Information System (INIS)

    1990-01-01

    The Commission of the European Communities, the International Atomic Energy Agency and the Nuclear Energy Agency of the OECD publish these Nuclear Safety Research Abstracts within the framework of their efforts to enhance the safety of nuclear power plants and to promote the exchange of research information. The abstracts are of nuclear safety related research projects for: pressurized light water cooled and moderated reactors (PWRs); boiling light water cooled and moderated reactors (BWRs); light water cooled and graphite moderated reactors (LWGRs); pressurized heavy water cooled and moderated reactors (PHWRs); gas cooled graphite moderated reactors (GCRs). Abstracts of nuclear safety research projects for fast breeder reactors are published independently by the Nuclear Energy Agency of the OECD and are not included in this joint publication. The intention of the collaborating international organizations is to publish such a document biannually. Work has been undertaken to develop a common computerized system with on-line access to the stored information

  3. Heat exchangers in heavy water reactor systems

    International Nuclear Information System (INIS)

    Mehta, S.K.

    1988-01-01

    Important features of some major heat exchange components of pressurized heavy water reactors and DHRUVA research reactor are presented. Design considerations and nuclear service classifications are discussed

  4. Fundamentals of pressurized water reactors

    International Nuclear Information System (INIS)

    Murray, L.

    1982-01-01

    In many countries, the pressurized water reactor (PWR) is the most widely used, even though it requires enrichment of the uranium to about 3% in U-235 and the moderator-coolant must be maintained at a high pressure, about 2200 pounds per square inch. Our objective in this series of seven lectures is to describe the design and operating characteristics of the PWR system, discuss the reactor physics methods used to evaluate performance, examine the way fuel is consumed and produced, study the instrumentation system, review the physics measurements made during initial startup of the reactor, and outline the administrative aspects of starting up a reactor and operating it safely and effectively

  5. Research and development of super light water reactors and super fast reactors in Japan

    International Nuclear Information System (INIS)

    Oka, Y.; Morooka, S.; Yamakawa, M.; Ishiwatari, Y.; Ikejiri, S.; Katsumura, Y.; Muroya, Y.; Terai, T.; Sasaki, K.; Mori, H.; Hamamoto, Y.; Okumura, K.; Kugo, T.; Nakatsuka, T.; Ezato, K.; Akasaka, N.; Hotta, A.

    2011-01-01

    Super Light Water Reactors (Super LWR) and Super Fast Reactors (Super FR) are the supercritical- pressure light water cooled reactors (SCWR) that are developed by the research group of University of Tokyo since 1989 and now jointly under development with the researchers of Waseda University, University of Tokyo and other organizations in Japan. The principle of the reactor concept development, the results of the past Super LWR and Super FR R&D as well as the R&D program of the Super FR second phase project are described. (author)

  6. Advances in heavy water reactors

    International Nuclear Information System (INIS)

    1994-03-01

    The current IAEA programme in advanced nuclear power technology promotes technical information exchange between Member States with major development programmes. The Technical Committee Meeting (TCM) on Advances in Heavy Water Reactors was organized by the IAEA in the framework of the activities of the International Working Group on Advanced Technologies for Water Cooled Reactors (IWGATWR) and hosted by the Atomic Energy of Canada Limited. Sixty-five participants from nine countries (Canada, Czech Republic, India, German, Japan, Republic of Korea, Pakistan, Romania and USA) and the IAEA attended the TCM. Thirty-four papers were presented and discussed in five sessions. A separate abstract was prepared for each of these papers. All recommendations which were addressed by the participants of the Technical Committee meeting to the IWGATWR have been submitted to the 5th IWGATWR meeting in September 1993. They were reviewed and used as input for the preparation of the IAEA programme in the area of advanced water cooled reactors. This TCM was mainly oriented towards advances in HWRs and on projects which are now in the design process and under discussion. Refs, figs and tabs

  7. Supercritical-pressure, once-through cycle light water cooled reactor concept

    International Nuclear Information System (INIS)

    Oka, Yoshiaki; Koshizuka, Seiichi

    2001-01-01

    The purpose of the study is to develop new reactor concepts for the innovation of light water reactors (LWR) and fast reactors. Concept of the once-through coolant cycle, supercritical-pressure light water cooled reactor was developed. Major aspects of reactor design and safety were analysed by the computer codes which were developed by ourselves. It includes core design of thermal and fast reactors, plant system, safety criteria, accident and transient analysis, LOCA, PSA, plant control, start up and stability. High enthalpy rise as supercritical boiler was achieved by evaluating the cladding temperature directly during transients. Fundamental safety principle of the reactor is monitoring coolant flow rate instead of water level of LWR. The reactor system is compact and simple because of high specific enthalpy of supercritical water and the once-through cycle. The major components are similar to those of LWR and supercritical thermal plant. Their temperature are within the experiences in spite of the high outlet coolant temperature. The reactor is compatible with tight fuel lattice fast reactor because of the high head pumps and low coolant flow rate. The power rating of the fast reactor is higher than the that of thermal reactor because of the high power density. (author)

  8. Performance of indigenous resistance welding equipment for PHWR fuel fabrication in NFC

    International Nuclear Information System (INIS)

    Hemantha Rao, G.V.S.; Jayaraj, R.N.; Prakash, M.S.; Gupta, U.C.; Ganguly, C.

    1999-01-01

    Indigenisation of critical equipment for manufacturing of PHWR fuel and automation in the production line have been the main thrust in NFC in recent years. As part of this endeavour, resistance welding equipment for end plug welding of Zircaloy-4 clad Uranium Oxide fuel pin and end plates of 19-element fuel bundles have been developed. The paper discusses the equipment design features, critical operating parameters and performance of these indigenous welding machines. (author)

  9. Estimation of tritium trapped in the used ion exchange column resins using water as scavenger

    International Nuclear Information System (INIS)

    Kumaravel, S.; Ramakrishna, V.; Nair, B.S.K.; Ganesh, G.; Tripathi, R.M.

    2018-01-01

    Estimation of Tritium trapped in the used resins of Ion exchange (IX) columns apart from the gross beta activity in heavy water systems of Pressurised Heavy Water Reactors (PHWR) is mandatory before their disposal as radioactive waste. The gross beta activity is estimated by Gieger- Muller (GM) counter and by using gamma spectrometer. Accurate estimation of tritium activity of the resin without compromising the counting efficiency is a challenging task because, if a fixed quantity of the resin is directly added to the scintillation solution and counted on a liquid scintillation analyser (LSA), it is prone to interfere with counting efficiency drastically and results in unquantifiable errors and other practical difficulties. In this study a standard technique using light water as scavenger medium to precisely quantify the total activity of tritium trapped in the resin by a systematic approach was carried out

  10. Light water reactor safety research project

    International Nuclear Information System (INIS)

    Markoczy, G.; Aksan, S.N.; Behringer, K.; Prodan, M.; Stierli, F.; Ullrich, G.

    1980-07-01

    The research and development activities for the safety of Light Water Power Reactors carried out 1979 at the Swiss Federal Institute for Reactor Research are described. Considerations concerning the necessity, objectives and size of the Safety Research Project are presented, followed by a detailed discussion of the activities in the five tasks of the program, covering fracture mechanics and nondestructive testing, thermal-hydraulics, reactor noise analysis and pressure vessel steel surveillance. (Auth.)

  11. Hydriding failure in water reactor fuel elements

    International Nuclear Information System (INIS)

    Sah, D.N.; Ramadasan, E.; Unnikrishnan, K.

    1980-01-01

    Hydriding of the zircaloy cladding has been one of the important causes of failure in water reactor fuel elements. This report reviews the causes, the mechanisms and the methods for prevention of hydriding failure in zircaloy clad water reactor fuel elements. The different types of hydriding of zircaloy cladding have been classified. Various factors influencing zircaloy hydriding from internal and external sources in an operating fuel element have been brought out. The findings of post-irradiation examination of fuel elements from Indian reactors, with respect to clad hydriding and features of hydriding failure are included. (author)

  12. ULTRA SCWR+: Practical advanced water reactor concepts

    International Nuclear Information System (INIS)

    Duffey, Romney; Khartabil, Hussam; Kuran, Sermet; Zhou, Tracy; Pioro, Igor

    2008-01-01

    Modern thermal power plants now utilize supercritical steam cycles with thermal efficiencies of over 45%. Recent developments have lead to Ultra-SuperCritical (USC) systems, which adopt reheat turbines that can attain efficiencies of over 50%. Because these turbines are already developed, demonstrated and deployed worldwide, and use existing and traditional steam cycle technology, the simplest nuclear advance is to utilize these proven thermal cycle conditions by coupling this turbine type to a reactor. This development direction is fundamentally counter to the usual approach of adopting high-temperature gas-cooled (helium-cooled) reactor cycles, for which turbines have yet to be demonstrated on commercial scale unlike the supercritical steam turbines. The ULTRA (Ultra-supercritical Light water Thermal ReActor) SCWR+ concept adopts the fundamental design approach of matching a water and steam-cooled reactor to the ultra-supercritical steam cycle, adopting the existing and planned thermal power plant turbines. The HP and IP sections are fed with conditions of 25 MPa/625degC and 7 MPa/700degC, respectively, to achieve operating plant thermal efficiencies in excess of 50%, with a direct turbine cycle. By using such low-pressure reheated steam, this concept also adopts technology that was explored and used many years ago in existing water reactors, with the potential to produce large quantities of low cost heat, which can be used for other industrial and district processes. Pressure-Tube (PT) reactors are suitable for adoption of this design approach and, in addition, have other advantages that will significantly improve water-cooled reactor technology. These additional advantages include enhanced safety and improved resource utilization and proliferation resistance. This paper describes the PT-SCWR+ concept and its potential enhancements. (author)

  13. Environmentally assisted cracking in light water reactors

    International Nuclear Information System (INIS)

    Kassner, T.F.; Ruther, W.E.; Chung, H.M.; Hicks, P.D.; Hins, A.G.; Park, J.Y.; Soppet, W.K.; Shack, W.J.

    1992-03-01

    This report summarizes work performed by Argonne National Laboratory on fatigue and environmentally assisted cracking in high water reactors during the six months from April 1991 through September 1991. Topics that have been investigated during this period include (1) fatigue and stress corrosion cracking (SCC) of low-alloy steel used in piping and in steam generator and reactor pressure vessels; (2) role of chromate and sulfate in simulated boiling water reactor (BWR) water on SCC of sensitized Type 304 SS; and (3) radiation-induced segregation (RIS) and irradiation-assisted SCC of Type 304 SS after accumulation of relatively high fluence. Fatigue data were obtained on medium-S-content A533-Gr B and A106-Gr B steels in high-purity (HP) deoxygenated water, in simulated pressurized water reactor (PWR) water, and in air. Crack-growth-rates (CGRs) of composite specimens of A533-Gr B/Inconel-182/Inconel-600 (plated with nickel) and homogeneous specimens of A533-Gr B were determined under small- amplitude cyclic loading in HP water with ∼ 300 ppb dissolved oxygen. CGR tests on sensitized Type 304 SS indicate that low chromate concentrations in BWR water (25--35 ppb) may actually have a beneficial effect on SCC if the sulfate concentration is below a critical level. Microchemical and microstructural changes in HP and commercial-purity Type 304 SS specimens from control-blade absorber tubes used in two operating BWRs were studied by Auger electron spectroscopy and scanning electron microscopy, and slow-strain,rate- tensile tests were conducts on tubular specimens in air and in simulated BWR water at 289 degrees C

  14. Heavy water moderated gas-cooled reactors

    International Nuclear Information System (INIS)

    Bailly du Bois, B.; Bernard, J.L.; Naudet, R.; Roche, R.

    1964-01-01

    France has based its main effort for the production of nuclear energy on natural Uranium Graphite-moderated gas-cooled reactors, and has a long term programme for fast reactors, but this country is also engaged in the development of heavy water moderated gas-cooled reactors which appear to present the best middle term prospects. The economy of these reactors, as in the case of Graphite, arises from the use of natural or very slightly enriched Uranium; heavy water can take the best advantages of this fuel cycle and moreover offers considerable development potential because of better reactor performances. A prototype plant EL 4 (70 MW) is under construction and is described in detail in another paper. The present one deals with the programme devoted to the development of this reactor type in France. Reasons for selecting this reactor type are given in the first part: advantages and difficulties are underlined. After reviewing the main technological problems and the Research and Development carried out, results already obtained and points still to be confirmed are reported. The construction of EL 4 is an important step of this programme: it will be a significant demonstration of reactor performances and will afford many experimentation opportunities. Now the design of large power reactors is to be considered. Extension and improvements of the mechanical structures used for EL 4 are under study, as well as alternative concepts. The paper gives some data for a large reactor in the present state of technology, as a result from optimization studies. Technical improvements, especially in the field of materials could lead to even more interesting performances. Some prospects are mentioned for the long run. Investment costs and fuel cycles are discussed in the last part. (authors) [fr

  15. Design of shutdown system no.2 liquid poison injection system for 500 MWe PHWR

    International Nuclear Information System (INIS)

    Bhatnagar, S.; Balasubrahmanian, A.K.; Pillai, A.V.

    1997-01-01

    Defence in depth and two group system concepts form the basic design philosophy for the shutdown systems. There are two independent, diverse and fast acting shutdown systems provided for the 500 MWe PHWR. The design is based on fail-safe principle, sufficient component redundancy and on-line testing. Liquid poison injection system, as shutdown system 2, is newly developed for the 500 MWe PHWRs. The system operates by rapidly injecting gadolinium nitrate solution into bulk moderator using stored helium pressure thereby inserting negative reactivity. A high pressure helium supply tank which provides the energy for system actuation, is connected, through an array of fast acting valves in series-parallel arrangement, to the individual poison tanks storing gadolinium nitrate solution. The valves, belonging to three different channels of reactor Protection System 2, are the only active components in the system. The valves are fail safe and are periodically tested on-line without actually firing the system. The system comprising of in-core assemblies and the external process system has been engineered. Experimental work is being carried out by BARC for design validation and data generation. This paper describes the conceptual development, design basis, design parameters and detailed engineering of the system. (author)

  16. Sea water take-up facility for cooling reactor auxiliary

    International Nuclear Information System (INIS)

    Numata, Noriko; Mizutani, Akira; Hirako, Shizuka; Uchiyama, Yuichi; Oda, Atsushi.

    1997-01-01

    The present invention provides an improvement of a cooling sea water take-up facility for cooling auxiliary equipments of nuclear power plant. Namely, an existent sea water take-up facility for cooling reactor auxiliary equipments has at least two circulation water systems and three independent sea water systems for cooling reactor auxiliary equipments. In this case, a communication water channel is disposed, which connects the three independent sea water systems for cooling reactor auxiliary equipments mutually by an opening/closing operation of a flow channel partitioning device. With such a constitution, even when any combination of two systems among the three circulation water systems is in inspection at the same time, one system for cooling the reactor auxiliary equipments can be kept operated, and one system is kept in a stand-by state by the communication water channel upon periodical inspection of water take-up facility for cooling the auxiliary equipments. As a result, the sea water take-up facility for cooling auxiliary equipments of the present invention have operation efficiency higher than that of a conventional case while keeping the function and safety at the same level as in the conventional case. (I.S.)

  17. The effect of heavy water reactors and liquid fuel reactors on the long-term development of nuclear energy

    International Nuclear Information System (INIS)

    Brand, P.; Wiechers, W.K.

    1974-01-01

    The effects of the rates at which various combinations of power reactor types are installed on the long-range (to the year 2040) uranium and plutonium inventory requirements are examined. Consideration is given to light water reactors, fast breeder reactors, high temperature gas-cooled reactors, heavy water reactors, and thermal breeder reactors, in various combinations, and assuming alternatively a 3% and a 5% growth in energy demand

  18. Heavy water cycle in the CANDU reactor

    International Nuclear Information System (INIS)

    Nanis, R.

    2000-01-01

    Hydrogen atom has two isotopes: deuterium 1 H 2 and tritium 1 H 3 . The deuterium oxide D 2 O is called heavy water due to its density of 1105.2 Kg/m 3 . Another important physical property of the heavy water is the low neutron capture section, suitable to moderate the neutrons into natural uranium fission reactor as CANDU. Due to the fact that into this reactor the fuel is cooled into the pressure tubes surrounded by a moderator, the usage of D 2 O as primary heat transport (PHT) agent is mandatory. Therefore a large amount of heavy water (approx. 500 tons) is used in a CANDU reactor. Being a costly resource - it represents 20% of the initial plant capital cost, D 2 O management is required to preserve it. (author)

  19. Pressure suppression pool hydrodynamic studies for horizontal vent exit of Indian PHWR containment

    International Nuclear Information System (INIS)

    Mohan, N.; Bajaj, S.S.; Saha, P.

    1994-01-01

    The standard Indian PHWR incorporates a pressure suppression type of containment system with a suppression pool.The design of KAPS (Kakrapar Atomic Power Station) suppression pool system adopts a modified system of downcomers having horizontal vents as compared to vertical vents of NAPS (Narora Atomic Power Station). Hydrodynamic studies for vertical vents have been reported earlier. This paper presents hydrodynamic studies for horizontal type vent system during LOCA. These studies include the phenomenon of vent clearing (where the water slug standing in downcomer initially is injected to wetwell due to rapid pressurization of drywell) followed by pool swell (elevation of pool water due to formation of bubbles due to air mass entering pool at the exit of horizontal vents from drywell). The analysis performed for vent clearing and pool swell is based on rigorous thermal hydraulic calculation consisting of conservation of air-steam mixture mass, momentum and thermal energy and mass of air. Horizontal vent of downcomer is modelled in such a way that during steam-air flow, variation of flow area due to oscillating water surface in downcomer could be considered. Calculation predicts that the vent gets cleared in about 1.0 second and the corresponding downward slug velocity in the downcomer is 4.61 m/sec. The maximum pool swell for a conservative lateral expansion is calculated to be 0.56 m. (author). 3 refs., 12 figs

  20. Transmutation of Americium in Light and Heavy Water Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hyland, B.; Dyck, G.R.; Edwards, G.W.R. [Chalk River Laboratories, Atomic Energy of Canada Limited (Canada); Ellis, R.J.; Gehin, J.C. [Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee (United States); Maldonado, G.I. [University of Tennessee (Knoxville)/ORNL, Tennessee (United States)

    2009-06-15

    There is interest worldwide in reducing the burden on geological nuclear fuel disposal sites. In most disposal scenarios the decay heat loading of the surrounding rock limits the capacity of these sites. On the long term, this decay heat is generated primarily by actinides, and a major contributor 100 to 1000 years after discharge from the reactor is {sup 241}Am. One possible approach to reducing the decay-heat burden is to reprocess spent reactor fuel and use thermal spectrum reactors to 'burn' the Am nuclides. The viability of this approach is dependent upon the detailed changes in chemical and isotopic composition of actinide-bearing fuels after irradiation in thermal reactor spectra. The currently available thermal spectrum reactor options include light water-reactors (LWRs) and heavy-water reactors (HWRs) such as the CANDU{sup R} designs. In addition, as a result of the recycle of spent LWR fuel, there would be a considerable amount of potential recycled uranium (RU). One proposed solution for the recycled uranium is to use it as fuel in Candu reactors. This paper investigates the possibilities of transmuting americium in 'spiked' bundles in pressurized water reactors (PWRs) and in boiling water reactors (BWRs). Transmutation of Am in Candu reactors is also examined. One scenario studies a full core fuelled with homogeneous bundles of Am mixed with recycled uranium, while a second scenario places Am in an inert matrix in target channels in a Candu reactor, with the rest of the reactor fuelled with RU. A comparison of the transmutation in LWRs and HWRs is made, in terms of the fraction of Am that is transmuted and the impact on the decay heat of the spent nuclear fuel. CANDU{sup R} is a registered trademark of Atomic Energy of Canada Limited (AECL). (authors)

  1. Water quality control device and water quality control method for reactor primary coolant system

    International Nuclear Information System (INIS)

    Wada, Yoichi; Ibe, Eishi; Watanabe, Atsushi.

    1995-01-01

    The present invention is suitable for preventing defects due to corrosion of structural materials in a primary coolant system of a BWR type reactor. Namely, a concentration measuring means measures the concentration of oxidative ingredients contained in a reactor water. A reducing electrode is disposed along a reactor water flow channel in the primary coolant system and reduces the oxidative ingredients. A reducing counter electrode is disposed along the reactor water flow channel in the primary coolant system, and electrically connected to the reducing electrode. The reactor structural materials are used as a reference electrode providing a reference potential to the reducing electrode and the reducing counter electrode. A potential control means controls the potential of the reducing electrode relative to the reference potential based on the signals from the concentration measuring means. A stable reference potential in a region where an effective oxygen concentration is stable can be obtained irrespective of the change of operation conditions by using the reactor structural materials disposed to a boiling region in the reactor core as a reference electrode. As a result, the water quality can be controlled at high accuracy. (I.S.)

  2. Design features of the Light Water Breeder Reactor (LWBR) which improve fuel utilization in light water reactors (LWBR development program)

    International Nuclear Information System (INIS)

    Hecker, H.C.; Freeman, L.B.

    1981-08-01

    This report surveys reactor core design features of the Light Water Breeder Reactor which make possible improved fuel utilization in light water reactor systems and breeding with the uranium-thorium fuel cycle. The impact of developing the uranium-thorium fuel cycle on utilization of nuclear fuel resources is discussed. The specific core design features related to improved fuel utilization and breeding which have been implemented in the Shippingport LWBR core are presented. These design features include a seed-blanket module with movable fuel for reactivity control, radial and axial reflcetor regions, low hafnium Zircaloy for fuel element cladding and structurals, and a closely spaced fuel rod lattice. Also included is a discussion of several design modifications which could further improve fuel utilization in future light water reactor systems. These include further development of movable fuel control, use of Zircaloy fuel rod support grids, and fuel element design modifications

  3. Pressurized-water reactors

    International Nuclear Information System (INIS)

    Bush, S.H.

    1983-03-01

    An overview of the pressurized-water reactor (PWR) pressure boundary problems is presented. Specifically exempted will be discussions of problems with pumps, valves and steam generators on the basis that they will be covered in other papers. Pressure boundary reliability is examined in the context of real or perceived problems occurring over the past 5 to 6 years since the last IAEA Reliability Symposium. Issues explicitly covered will include the status of the pressurized thermal-shock problem, reliability of inservice inspections with emphasis on examination of the region immediately under the reactor pressure vessel (RPV) cladding, history of piping failures with emphasis on failure modes and mechanisms. Since nondestructive examination is the topic of one session, discussion will be limited to results rather than techniques

  4. Tritium issues in commercial pressurized water reactors

    International Nuclear Information System (INIS)

    Jones, G.

    2008-01-01

    Tritium has become an important radionuclide in commercial Pressurized Water Reactors because of its mobility and tendency to concentrate in plant systems as tritiated water during the recycling of reactor coolant. Small quantities of tritium are released in routine regulated effluents as liquid water and as water vapor. Tritium has become a focus of attention at commercial nuclear power plants in recent years due to inadvertent, low-level, chronic releases arising from routine maintenance operations and from component failures. Tritium has been observed in groundwater in the vicinity of stations. The nuclear industry has undertaken strong proactive corrective measures to prevent recurrence, and continues to eliminate emission sources through its singular focus on public safety and environmental stewardship. This paper will discuss: production mechanisms for tritium, transport mechanisms from the reactor through plant, systems to the environment, examples of routine effluent releases, offsite doses, basic groundwater transport and geological issues, and recent nuclear industry environmental and legal ramifications. (authors)

  5. High conversion heavy water moderated reactor

    International Nuclear Information System (INIS)

    Miyawaki, Yoshio; Wakabayashi, Toshio.

    1989-01-01

    In the present invention, fuel rods using uranium-plutonium oxide mixture fuels are arranged in a square lattice at the same pitch as that in light water cooled reactor and heavy water moderators are used. Accordingly, the volume ratio (Vm/Vf) between the moderator and the fuel can be, for example, of about 2. When heavy water is used for the moderator (coolant), since the moderating effect of heavy water is lower than that of light water, a high conversion ratio of not less than 0.8 can be obtained even if the fuel rod arrangement is equal to that of PWR (Vm/Vf about 2). Accordingly, it is possible to avoid problems caused by dense arrangement of fuel rods as in high conversion rate light water cooled reactors. That is, there are no more troubles in view of thermal hydrodynamic characteristics, re-flooding upon loss of coolant accident, etc., as well as the fuel production cost is not increased. (K.M.)

  6. Flow analysis in a supercritical water oxidation reactor

    International Nuclear Information System (INIS)

    Oh, C.H.; Kochan, R.J.; Beller, J.M.

    1996-01-01

    Supercritical water oxidation (SCWO), also known as hydrothermal oxidation (HTO), involves the oxidation of hazardous waste at conditions of elevated temperature and pressure (e.g., 500 C--600 C and 234.4 bar) in the presence of approximately 90% of water and a 10% to 20% excess amount of oxidant over the stoichiometric requirement. Under these conditions, organic compounds are completely miscible with supercritical water, oxygen and nitrogen, and are rapidly oxidized to carbon dioxide and water. The essential part of the process is the reactor. Many reactor designs such as tubular, vertical vessel, and transpiring wall type have been proposed, patented, and tested at both bench and pilot scales. These designs and performances need to be scaled up to a waste throughput 10--100 times that currently being tested. Scaling of this magnitude will be done by creating a numerical thermal-hydraulic model of the smaller reactor for which test data is available, validating the model against the available data, and then using the validated model to investigate the larger reactor performance. This paper presents a flow analysis of the MODAR bench scale reactor (vertical vessel type). These results will help in the design of the reactor in an efficient manner because the flow mixing coupled with chemical kinetics eventually affects the process destruction efficiency

  7. Water chemistry management of research reactor in JAERI

    Energy Technology Data Exchange (ETDEWEB)

    Yoshijima, Tetsuo [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-10-01

    The JRR-3M cooling system consists of four systems, namely; (1) primary cooling system, (2) heavy water cooling system, (3) helium system and (4) secondary cooling system. The heavy water is used for reflector and pressurized with helium gas. Water chemistry management of the JRR-3M cooling systems is one of the important subject for the safety operation. The main objects are to prevent the corrosion of cooling system and fuel elements, to suppress the plant radiation build-up and to minimize the generation of radioactive waste. All measured values were within the limits of specifications and JRR-3M reactor was operated with safety in 1996. Spent fuels of JRR-3M reactor are stored in the spent fuel pool. This pool water has been analyzed to prevent corrosion of aluminum cladding of spent fuels. Water chemistry of spent fuel pool water is applied to the prevention of corrosion of aluminum alloys including fuel cladding. The JRR-2 reactor was eternally stopped in December 1996 and is now under decommissioning. The JRR-2 reactor is composed of heavy water tank, fuel guide tube and horizontal experimental hole. These are constructed of aluminum alloy and biological shield and upper shield are constructed of concrete. Three types of corrosion of aluminum alloy were observed in the JRR-2. The Alkaline corrosion of aluminum tube occurred in 1972 because of the mechanical damage of the aluminum fuel guide tube which is used for fuel handling. Modification of the reactor top shield was started in 1974 and completed in 1975. (author)

  8. Screening reactor steam/water piping systems for water hammer

    International Nuclear Information System (INIS)

    Griffith, P.

    1997-09-01

    A steam/water system possessing a certain combination of thermal, hydraulic and operational states, can, in certain geometries, lead to a steam bubble collapse induced water hammer. These states, operations, and geometries are identified. A procedure that can be used for identifying whether an unbuilt reactor system is prone to water hammer is proposed. For the most common water hammer, steam bubble collapse induced water hammer, six conditions must be met in order for one to occur. These are: (1) the pipe must be almost horizontal; (2) the subcooling must be greater than 20 C; (3) the L/D must be greater than 24; (4) the velocity must be low enough so that the pipe does not run full, i.e., the Froude number must be less than one; (5) there should be void nearby; (6) the pressure must be high enough so that significant damage occurs, that is the pressure should be above 10 atmospheres. Recommendations on how to avoid this kind of water hammer in both the design and the operation of the reactor system are made

  9. Localized corrosion problems in water reactors

    International Nuclear Information System (INIS)

    Coriou, Henri.

    1977-01-01

    Main localized etching on the structure materials of water reactors are studied: stress corrosion on stainless steel 304 (B.W.R), stress corrosion, 'wall thinning' and denting of Inconel 600 vapor generator tubes (P.W.R.). Some mechanisms are examined and practical exemples in reactors are described. Various possible cures are presented [fr

  10. Aging considerations for PWR [pressurized water reactor] control rod drive mechanisms and reactor internals

    International Nuclear Information System (INIS)

    Ware, A.G.

    1988-01-01

    This paper describes age-related degradation mechanisms affecting life extension of pressurized water reactor control rod drive mechanisms and reactor internals. The major sources of age-related degradation for control rod drive mechanisms are thermal transients such as plant heatups and cooldowns, latchings and unlatchings, long-term aging effects on electrical insulation, and the high temperature corrosive environment. Flow induced loads, the high-temperature corrosive environment, radiation exposure, and high tensile stresses in bolts all contribute to aging related degradation of reactor internals. Another problem has been wear and fretting of instrument guide tubes. The paper also discusses age-related failures that have occurred to date in pressurized water reactors

  11. Theoretical and experimental investigations into natural circulation behaviour in a simulated facility of the Indian PHWR under reduced inventory conditions

    International Nuclear Information System (INIS)

    Satish Kumar, N.V.; Nayak, A.K.; Vijayan, P.K.; Pal, A.K.; Saha, D.; Sinha, R.K.

    2004-01-01

    A theoretical and experimental investigation has been carried out to study natural circulation characteristics of an Indian PHWR under reduced inventory conditions. The theoretical model incorporates a quasi-steady state analysis of natural circulation at different system inventories. It predicts the system flow rate under single-phase and two-phase conditions and the inventory at which reflux condensation occurs. The model predictions were compared with test data obtained from FISBE (facility for integral system behaviour experiments), which simulates the thermal hydraulic behaviour of the Indian 220 MWe PHWR. The experimental results were found to be in close agreement with the predictions. It was also found that the natural circulation could be oscillatory under reduced inventory conditions. (orig.)

  12. Development of a diagnostic system for identifying accident conditions in a reactor

    International Nuclear Information System (INIS)

    Santhosh; Gera, B.; Kumar, Mithilesh; Thangamani, I.; Prasad, Hari; Srivastava, A.; Dutta, Anu; Sharma, Pavan K.; Majumdar, P.; Verma, V.; Mukhopadhyay, D.; Ganju, Sunil; Chatterjee, B.; Sanyasi Rao, V.V.S.; Lele, H.G.; Ghosh, A.K.

    2009-07-01

    This report describes a methodology for identification of accident conditions in a nuclear reactor from the signals available to the operator. A large database of such signals is generated through analyses - for core, containment, environmental dispersion and radiological dose to train a computer code based on an Artificial Neural Networks (ANNs). At present, in the prediction mode, information on LOCA (location and size of break), status of availability of ECCS, and expected doses can be predicted well for a 220 MWe PHWR. (author)

  13. An Investigation into Water Chemistry in Primary Coolant Circuit of an Advanced Boiling Water Reactor

    International Nuclear Information System (INIS)

    Wu, Bing-Jhen; Yeh, Tsung-Kuang; Wang, Mei-Ya; Sheu, Rong-Jiun

    2012-09-01

    To ensure operation safety, an optimization on the coolant chemistry in the primary coolant circuit of a nuclear reactor is essential no matter what type or generation the reactor belongs to. For a better understanding toward the water chemistry in an advanced boiling water reactor (ABWR), such as the one being constructed in the northern part of Taiwan, and for a safer operation of this ABWR, we conducted a proactive, thorough water chemistry analysis prior to the completion of this reactor in this study. A numerical simulation model for water chemistry analyses in ABWRs has been developed, based upon the core technology we established in the past. This core technology for water chemistry modeling is basically an integration of water radiolysis, thermal-hydraulics, and reactor physics. The model, by the name of DEMACE - ABWR, is an improved version of the original DEMACE model and was used for radiolysis and water chemistry prediction in the Longmen ABWR in Taiwan. Predicted results pertinent to the water chemistry variation and the corrosion behavior of structure materials in the primary coolant circuit of this ABWR under rated-power operation were reported in this paper. (authors)

  14. Halden Boiling Water Reactor. Plant Performance and Heavy-Water Management

    Energy Technology Data Exchange (ETDEWEB)

    Aas, S.; Jamne, E.; Wullum, T.; Fjellestad, K. [Institutt for Atomenergi, OECD Halden Reactor Project, Halden (Norway)

    1968-04-15

    The Halden boiling heavy-water reactor, designed and built by the Norwegian Institutt for Atomenergi, has since June 1958 been operated as an international project. On its second charge the reactor was operated at power levels up to 25 MW and most of the time at a pressure of 28.5 kg/cm{sup 2}. During the period from July 1964 to December 1966 the plant availability was close to 64% including shutdowns because of test fuel failures and loading/unloading of fuel. Disregarding such stops, the availability was close to 90%. The average burnup of the core is about 6200 MWd/t UO{sub 2} : the most highly exposed elements have reached 10000 MWd/t UO{sub 2}. The transition temperature of the reactor tank has been followed closely. The results of the surveillance programme and the implication on the reactor operation are discussed. The reactor is located in a cave in a rock. Some experiences with such a containment are given. To locate failed test-fuel elements a fuel failure location system has been installed. A fission gas collection system has saved valuable reactor time during clean-up of the reactor system following test fuel failures. Apart from one incident with two of the control stations, the plant control and instrumentation systems have functioned satisfactorily. Two incidents with losses of 150 and 200 kg of heavy water have occurred. However, after improved methods for leakage detection had been developed, the losses have been kept better than 50 g/h . Since April 1962 the isotopic purity of the heavy water (14 t) has decreased from 99.75 to 99.62%. The tritium concentration is now slightly above 700 {mu}C/cm{sup 3}. This activity level has not created any serious operational or maintenance problems. An extensive series of water chemistry experiments has been performed to study the influence of various operating parameters on radiolytic gas formation. The main results of these experiments will be reported. Different materials such as mild steel, ferritic steel

  15. Utility requirements for advanced light water reactors

    International Nuclear Information System (INIS)

    Machiels, A.; Gray, S.; Mulford, T.; Rodwell, E.

    1996-01-01

    The nuclear energy industry is actively engaged in developing advanced light water reactor (ALWR) designs for the next century. The new designs take advantage of the thousands of reactor-years of experience that have been accumulated by operating over 400 plants worldwide. The EPRI effort began in the early 1980's, when a survey of utility executives was conducted to determine their prerequisites for ordering nuclear power plants. The results were clear: new plants had to be simpler and safer, and have greater design margins, i.e., be more forgiving. The utility executives also supported making improvements to the established light water reactor technology, rather than trying to develop new reactor concepts. Finally, they wanted the option to build mid-size plants (∼600 MWe) in addition to full-size plants of more than 1200 MWe. 4 refs

  16. Pressurized water reactors: the EPR project

    International Nuclear Information System (INIS)

    Py, J.P.; Yvon, M.

    2007-01-01

    EPR (originally 'European pressurized water reactor', and now 'evolutionary power reactor') is a model of reactor initially jointly developed by French and German engineers which fulfills the particular safety specifications of both countries but also the European utility requirements jointly elaborated by the main European power companies under the initiative of Electricite de France (EdF). Today, two EPR-based reactors are under development: one is under construction in Finland and the other, Flamanville 3 (France), received its creation permit decree on April 10, 2007. This article presents, first, the main objectives of the EPR, and then, describes the Flamanville 3 reactor: reactor type and general conditions, core and conditions of operation, primary and secondary circuits with their components, main auxiliary and recovery systems, man-machine interface and instrumentation and control system, confinement and serious accidents, arrangement of buildings. (J.S.)

  17. Standard Technical Specifications for Westinghouse pressurized water reactors

    International Nuclear Information System (INIS)

    Virgilio, M.J.

    1980-09-01

    The Standard Technical Specifications for Westinghouse Pressurized Water Reactors (W-STS) is a generic document prepared by the U.S. NRC for use in the licensing process of current Westinghouse Pressurized Water Reactors. The W-STS sets forth the Limits, Operating Conditions and other requirements applicable to nuclear reactor facility operation as set forth in by Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public. This document is revised periodically to reflect current licensing requirements

  18. Thermophysical properties of materials for water cooled reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The IAEA Co-ordinated Research Programme (CRP) to establish a thermophysical properties data base for light and heavy water reactor materials was organized within the framework of the IAEA`s International Working Group on Advanced Technologies for Water Cooled Reactors. The work within the CRP started in 1990. The objective of the CRP was to collect and systemaize a thermophysical properties data base for light and heavy water reactor materials under normal operating, transient and accident conditions. The important thermophysical properties include thermal conductivity, thermal diffusivity, specific heat capacity, enthalpy, thermal expansion and others. These properties as well as the oxidation of zirconium-based alloys, the thermophysical characteristics of high temperature concrete-core melt interaction and the mechanical properties of construction materials are presented in this report. It is hoped that this report will serve as a useful source of thermophysical properties data for water cooled reactor analyses. The properties data are maintained on the THERSYST system at the University of Stuttgart, Germany and are internationally available. Refs, figs, tabs.

  19. Thermophysical properties of materials for water cooled reactors

    International Nuclear Information System (INIS)

    1997-06-01

    The IAEA Co-ordinated Research Programme (CRP) to establish a thermophysical properties data base for light and heavy water reactor materials was organized within the framework of the IAEA's International Working Group on Advanced Technologies for Water Cooled Reactors. The work within the CRP started in 1990. The objective of the CRP was to collect and systemaize a thermophysical properties data base for light and heavy water reactor materials under normal operating, transient and accident conditions. The important thermophysical properties include thermal conductivity, thermal diffusivity, specific heat capacity, enthalpy, thermal expansion and others. These properties as well as the oxidation of zirconium-based alloys, the thermophysical characteristics of high temperature concrete-core melt interaction and the mechanical properties of construction materials are presented in this report. It is hoped that this report will serve as a useful source of thermophysical properties data for water cooled reactor analyses. The properties data are maintained on the THERSYST system at the University of Stuttgart, Germany and are internationally available. Refs, figs, tabs

  20. Environmentally assisted cracking in Light Water Reactors

    International Nuclear Information System (INIS)

    Chung, H.M.; Chopra, O.K.; Ruther, W.E.; Kassner, T.F.; Michaud, W.F.; Park, J.Y.; Sanecki, J.E.; Shack, W.J.

    1993-09-01

    This report summarizes work performed by Argonne National Laboratory on fatigue and environmentally assisted cracking (EAC) in light water reactors (LWRs) during the six months from October 1992 to March 1993. Fatigue and EAC of piping, pressure vessels, and core components in LWRs are important concerns as extended reactor lifetimes are envisaged. Topics that have been investigated include (1) fatigue of low-alloy steel used in piping, steam generators, and reactor pressure vessels. (2) EAC of cast stainless steels (SSs), (3) radiation-induced segregation and irradiation-assisted stress corrosion cracking of Type 304 SS after accumulation of relatively high fluence, and (4) EAC of low-alloy steels. Fatigue tests were conducted on medium-sulfur-content A106-Gr B piping and A533-Gr B pressure vessel steels in simulated PWR water and in air. Additional crack growth data were obtained on fracture-mechanics specimens of cast austenitic SSs in the as-received and thermally aged conditions and chromium-nickel-plated A533-Gr B steel in simulated boiling-water reactor (BWR) water at 289 degrees C. The data were compared with predictions based on crack growth correlations for ferritic steels in oxygenated water and correlations for wrought austenitic SS in oxygenated water developed at ANL and rates in air from Section XI of the ASME Code. Microchemical and microstructural changes in high- and commercial-purity Type 304 SS specimens from control-blade absorber tubes and a control-blade sheath from operating BWRs were studied by Auger electron spectroscopy and scanning electron microscopy

  1. Development of an inconel self powered neutron detector for in-core reactor monitoring

    Science.gov (United States)

    Alex, M.; Ghodgaonkar, M. D.

    2007-04-01

    The paper describes the development and testing of an Inconel600 (2 mm diameter×21 cm long) self-powered neutron detector for in-core neutron monitoring. The detector has 3.5 mm overall diameter and 22 cm length and is integrally coupled to a 12 m long mineral insulated cable. The performance of the detector was compared with cobalt and platinum detectors of similar dimensions. Gamma sensitivity measurements performed at the 60Co irradiation facility in 14 MR/h gamma field showed values of -4.4×10 -18 A/R/h/cm (-9.3×10 -24 A/ γ/cm 2-s/cm), -5.2×10 -18 A/R/h/cm (-1.133×10 -23 A/ γ/cm 2-s/cm) and 34×10 -18 A/R/h/cm (7.14×10 -23 A/ γ/cm 2-s/cm) for the Inconel, Co and Pt detectors, respectively. The detectors together with a miniature gamma ion chamber and fission chamber were tested in the in-core Apsara Swimming Pool type reactor. The ion chambers were used to estimate the neutron and gamma fields. With an effective neutron cross-section of 4b, the Inconel detector has a total sensitivity of 6×10 -23 A/nv/cm while the corresponding sensitivities for the platinum and cobalt detectors were 1.69×10 -22 and 2.64×10 -22 A/nv/cm. The linearity of the detector responses at power levels ranging from 100 to 200 kW was within ±5%. The response of the detectors to reactor scram showed that the prompt response of the Inconel detector was 0.95 while it was 0.7 and 0.95 for the platinum and cobalt self-powered detectors, respectively. The detector was also installed in the horizontal flux unit of 540 MW Pressurised Heavy Water Reactor (PHWR). The neutron flux at the detector location was calculated by Triveni code. The detector response was measured from 0.02% to 0.07% of full power and showed good correlation between power level and detector signals. Long-term tests and the dynamic response of the detector to shut down in PHWR are in progress.

  2. Development of an inconel self powered neutron detector for in-core reactor monitoring

    International Nuclear Information System (INIS)

    Alex, M.; Ghodgaonkar, M.D.

    2007-01-01

    The paper describes the development and testing of an Inconel600 (2 mm diameterx21 cm long) self-powered neutron detector for in-core neutron monitoring. The detector has 3.5 mm overall diameter and 22 cm length and is integrally coupled to a 12 m long mineral insulated cable. The performance of the detector was compared with cobalt and platinum detectors of similar dimensions. Gamma sensitivity measurements performed at the 60 Co irradiation facility in 14 MR/h gamma field showed values of -4.4x10 -18 A/R/h/cm (-9.3x10 -24 A/γ/cm 2 -s/cm), -5.2x10 -18 A/R/h/cm (-1.133x10 -23 A/γ/cm 2 -s/cm) and 34x10 -18 A/R/h/cm (7.14x10 -23 A/γ/cm 2 -s/cm) for the Inconel, Co and Pt detectors, respectively. The detectors together with a miniature gamma ion chamber and fission chamber were tested in the in-core Apsara Swimming Pool type reactor. The ion chambers were used to estimate the neutron and gamma fields. With an effective neutron cross-section of 4b, the Inconel detector has a total sensitivity of 6x10 -23 A/nv/cm while the corresponding sensitivities for the platinum and cobalt detectors were 1.69x10 -22 and 2.64x10 -22 A/nv/cm. The linearity of the detector responses at power levels ranging from 100 to 200 kW was within ±5%. The response of the detectors to reactor scram showed that the prompt response of the Inconel detector was 0.95 while it was 0.7 and 0.95 for the platinum and cobalt self-powered detectors, respectively. The detector was also installed in the horizontal flux unit of 540 MW Pressurised Heavy Water Reactor (PHWR). The neutron flux at the detector location was calculated by Triveni code. The detector response was measured from 0.02% to 0.07% of full power and showed good correlation between power level and detector signals. Long-term tests and the dynamic response of the detector to shut down in PHWR are in progress

  3. The water chemistry of CANDU PHW reactors

    International Nuclear Information System (INIS)

    LeSurf, J.E.

    1978-01-01

    This review will discuss the chemistry of the three major water circuits in a CANDU-PHW reactor, viz., the Primary Heat Transport (PHT) water, the moderator and the boiler water. An important consideration for the PHT chemistry is the control of corrosion and of the transport of corrosion products to minimize the growth of radiation fields. In new reactors the PHT will be allowed to boil, requiring reconsideration of the methods used to radiolytic oxygen and elevate the pH. Separation of the moderator from the PHT in the pressure-tubed CANDU design permits better optimization of the chemistry of each system, avoiding the compromises necessary when the same water serves both functions. Major objectives in moderator chemistry are to control (a) the radiolytic decomposition of D 2 0; (b) the concentration of soluble neutron poisons added to adjust reactivity; and (c) the chemistry of shutdown systems. The boiler water and its feed water are treated to avoid boiler tube corrosion, both during normal operation and when perturbations are caused to the feed by, for example, leaks in the condenser tubes which permit ingress of untreated condenser cooling water. Development of a system for automatic analysis and control of feed water to give rapid, reliable response to abnormal conditions is a novel feature which has been developed for incorporation in future CANDU-PHW reactors. (author)

  4. Water Reactor Fuel Performance Meeting 2008

    International Nuclear Information System (INIS)

    2008-10-01

    This meeting contains articles of the Water Reactor Fuel Performance Meeting 2008 of Korean Nuclear Society, Atomic Energy Society of Japan, Chinese Nuclear Society, European Nuclear Society and American Nuclear Society. It was held on Oct. 19-23, 2008 in Seoul, Korea and subject of Meeting is 'New Clear' Fuel - A green energy solution. This proceedings is comprised of 5 tracks. The main topic titles of track are as follows: Advances in water reactor fuel technology, Fuel performance and operational experience, Transient fuel behavior and safety-related issues, Fuel cycle, spent fuel storage and transportations and Fuel modeling and analysis. (Yi, J. H.)

  5. Transient behaviour and coupling aspects of a hybrid MSF-RO nuclear desalination plant

    International Nuclear Information System (INIS)

    Tewari, P.K.; Misra, B.M.

    1998-01-01

    BARC is setting up a 6300 M 3 /day (1.4 MGD) hybrid MSF-RO nuclear desalination plant for sea water desalination at Madras Atomic Power Station (MAPS) coupled to a 170 MWe Pressurised Heavy Water Reactor (PHWR). The transient behaviour and coupling aspects of this dual purpose plant has been discussed. A hybrid desalination plant appears to offer high availability factor. (author)

  6. Some local dilution transient in a pressurized water reactor

    International Nuclear Information System (INIS)

    Jacobson, S.

    1989-01-01

    Reactivity accidents are important in the safety analysis of a pressurized water reactor. In this anlysis ejected control rod, steam line break, start of in-active loop and boron dilution accidents are usually dealt with. However, in the analysis is not included what reactivity excursions might happen when a zone,depleted of boron passes the reactor core. This thesis investigates during what operation and emergency conditions diluted zones might exist in a pressurized water reactor and what should be the maximum volumes for then. The limiting transport means are also established in terms of reactivty addition, for the depleted zones. In order to describe the complicated mixing process in the reactor vessel during such a transportation, a typical 3-loop reactor vessel has been modulated by means of TRAC-PF1's VESSEL component. Three cases have been analysed. In the first case the reactor is in a cold condition and the ractor coolant has boron concentration of 2000 ppm. To the reactor vessel is injected an clean water colume of 14 m 3 . In the two other cases the reactor is close to hot shutdown and borated to 850 ppm. To the reactor vessel is added 41 and 13 m 3 clean water, respectively. In the thesis is shown what spatial distribution the depleted zone gets when passing through the reactor vessel in the three cases. The boron concentration in the first case did not decrease the values which would bring the reactor to critical condition. For case two was shown by means of TRAC's point kinetics model that the reactor reaches prompt criticality after 16.03 seconds after starting of the reactor coolant pump. Another prompt criticality occured two seconds later. The total energy developed during the two power escalations were about 55 GJ. A comparision with the criteria used to evaluate the ejected control rod reactivity transient showed that none of these criteria were exceeded. (64 figs.)

  7. Design and analysis on super-critical water cooled power reactors

    International Nuclear Information System (INIS)

    Ishiwatari, Yuki

    2005-01-01

    The Super-Critical Water Cooled Power Reactors (SCPR) is cooled by 25 MPa supercritical water of 280degC at reactor inlet and greater than 500degC at reactor outlet and directly connected with turbine/generators with high energy conversion efficiency. This corresponds to the deletion of recirculation system and steam-water separation system of BWR type reactors or of pressurizer and steam generator of PWR type reactors. In addition to the design study of the university of Tokyo, technology development of the SCPR for practical use has started under the collaboration of industry and academia since 2000. Mockup single tube and bundle tests for heat transfer/fluid flow characteristics of the design have been conducted with 3D heat transfer analysis. Materials compatible with coolant conditions for fuel cans and reactor internals are also assessed. Overall evaluation of the reactor concept is under way. (T. Tanaka)

  8. Pressurized water reactor inspection procedures

    International Nuclear Information System (INIS)

    Heinrich, D.; Mueller, G.; Otte, H.J.; Roth, W.

    1998-01-01

    Inspections of the reactor pressure vessels of pressurized water reactors (PWR) so far used to be carried out with different central mast manipulators. For technical reasons, parallel inspections of two manipulators alongside work on the refueling cavity, so as to reduce the time spent on the critical path in a revision outage, are not possible. Efforts made to minimize the inspection time required with one manipulator have been successful, but their effects are limited. Major reductions in inspection time can be achieved only if inspections are run with two manipulators in parallel. The decentralized manipulator built by GEC Alsthom Energie and so far emmployed in boiling water reactors in the USA, Spain, Switzerland and Japan allows two systems to be used in parallel, thus reducing the time required for standard inspection of a pressure vessel from some six days to three days. These savings of approximately three days are made possible without any compromises in terms of positioning by rail-bound systems. During inspection, the reactor refueling cavity is available for other revision work without any restrictions. The manipulator can be used equally well for inspecting standard PWR, PWR with a thermal shield, for inspecting the land between in-core instrumentation nozzles, BWR with and without jet pumps (complementary inspection), and for inspecting core support shrouds. (orig.) [de

  9. Systems design of direct-cycle supercritical-water-cooled fast reactors

    International Nuclear Information System (INIS)

    Oka, Yoshiaki; Koshizuka, Seiichi; Jevremovic, Tatjana; Okano, Yashushi

    1995-01-01

    The system design of a direct-cycle supercritical-water-cooled fast reactor is presented. The supercritical water does not exhibit a change of phase. the recirculation system, steam separator, and dryer of a boiling water reactor (BWR) are unnecessary. Roughly speaking, the reactor pressure vessel and control rods are similar to those of a pressurized water reactor, the containment and emergency core cooling system are similar to a BWR, and the balance of plant is similar to a supercritical-pressure fossil-fired power plant (FPP). the electric power of the fast converter is 1,508 MW(electric). The number of coolant loops is only two because of the high coolant enthalpy. Containment volume is much reduced. The thermal efficiency is improved 24% over a BWR. The coolant void reactivity is negative by placing thin zirconium-hydride layers between seeds and blankets. The power costs would be much reduced compared with those of a light water reactor (LWR) and a liquid-metal fast breeder reactor. The concept is based on the huge amount of experience with the water coolant technology of LWRs and FPPs. The oxidation of stainless steel cladding is avoided by adopting a much lower coolant temperature than that of the FPP

  10. Development of advanced boiling water reactor for medium capacity

    International Nuclear Information System (INIS)

    Kazuo Hisajima; Yutaka Asanuma

    2005-01-01

    This paper describes a result of development of an Advanced Boiling Water Reactor for medium capacity. 1000 MWe was selected as the reference. The features of the current Advanced Boiling Water Reactors, such as a Reactor Internal Pump, a Fine Motion Control Rod Drive, a Reinforced Concrete Containment Vessel, and three-divisionalized Emergency Core Cooling System are maintained. In addition, optimization for 1000 MWe has been investigated. Reduction in thermal power and application of the latest fuel reduced the number of fuel assemblies, Control Rods and Control Rod Drives, Reactor Internal Pumps, and Safety Relief Valves. The number of Main Steam lines was reduced from four to two. As for the engineered safety features, the Flammability Control System was removed. Special efforts were made to realize a compact Turbine Building, such as application of an in line Moisture Separator, reduction in the number of pumps in the Condensate and Feedwater System, and change from a Turbine-Driven Reactor Feedwater Pump to a Motor-Driven Reactor Feedwater Pump. 31% reduction in the volume of the Turbine Building is expected in comparison with the current Advanced Boiling Water Reactors. (authors)

  11. Engineered safety in development of liquid poison injection system (shut down system-2) for 500 MWe PHWR

    International Nuclear Information System (INIS)

    Sapra, M.K.; Kundu, S.N.; Mohan, L.R.

    2002-01-01

    Full text: The provision of shut down systems (SDS) is a mandatory requirement for safety of any nuclear reactor. The SDS shall be capable of making and holding the core adequately subcritical in the event of any anticipated operational occurrence and postulated accident conditions. The shut down function will perform as intended when its design and components are thoroughly evaluated for their reliability and effectiveness. A full scale mock up for one injection unit was designed and developed at Hall No.7, BARC. Experimental studies were carried out to qualify the design and evolve process parameters such as gas tank pressure, poison discharge rate and poison injection time. In liquid poison injection system i.e. shutdown system -2, there is no physical barrier, between the two liquids i.e. the poison and the moderator. A liquid in liquid interface, called poison moderator interface (PMI) separates these fluids. Extensive lab scale studies have been carried out on PMI movement study i.e. the interface movement due to molecular diffusion and due to process disturbances under simulated reactor condition. On the basis of lab scale results, a full-scale PMI setup has been designed and developed to generate plant data. From reactor safety consideration, the floating ball in poison tank is designed in such a way that it prevents the over pressurisation of calandria. For this purpose a non-intrusive ultrasonic ball detection system (U-BDS) has been developed. This paper covers the PMI system for 500 MWe PHWR with relevant safety aspects and describes in detail, the experimental results of PMI study. The engineered safety in design, methodology and qualification of U-BDS and its role intended in performance of SDS-2 have been also discussed in the paper

  12. Nonlinear dynamics of boiling water reactors

    International Nuclear Information System (INIS)

    March-Leuba, J.; Cacuci, D.G.; Perez, R.B.

    1983-01-01

    Recent stability tests in Boiling Water Reactors (BWRs) have indicated that these reactors can exhibit the special nonlinear behavior of following a closed trajectory called limit cycle. The existence of a limit cycle corresponds to an oscillation of fixed amplitude and period. During these tests, such oscillations had their amplitudes limited to about +- 15% of the operating power. Since limit cycles are fairly insensitive to parameter variations, it is possible to operate a BWR under conditions that sustain a limit cycle (of fixed amplitude and period) over a finite range of reactor parameters

  13. Realizing vision of Dr. Homi Bhabha - first stage of nuclear power programme

    International Nuclear Information System (INIS)

    Bhardwaj, S.A.

    2009-01-01

    Full text: Dr. Homi Bhabha had a vision to harness nuclear energy for peaceful uses of mankind. Considering typical nuclear resources in the country, Dr Bhabha conceptualized the three stage nuclear power programme and gave a road map for its implementation. The robustness of the vision is such that the programme has not undergone a change in last five decades. The first stage of the three-stage programme, based on natural uranium fuelled Pressurised Heavy Water Reactors (PHWRs) has been precursor to the nuclear power programme in India. This paper describes the developments in the last five decades. The establishment of research laboratories and reactors, training school for the manpower needs, industrial infrastructure and establishment of regulatory framework are briefly described. Setting up of first nuclear power reactor in the country as turnkey project and experience on operation of these reactors in India are discussed. The learning phase consisting of setting up of first PHWR in technical collaboration with Canada and design of 220 MWe PHWRs for MAPS is described. The safety features consistent with development of nuclear power globally were incorporated in Narora design and this became a standardized 220 MWe reactor of which many PHWRs of 220 MWe were set up. The experiences with operation of these small size reactors leading to internationally best operational experience in the year 2002 are discussed. The efforts of plant life extension, in-core maintenance jobs and other renovation and modernization jobs are discussed. The increase in unit size of 540 MWe, of which two reactors have been already set up, is explained in detail. The economies of scale demanded increase in the unit size and design of 700 MWe PHWR has been established and the salient features of this design are also discussed in detail. Eight reactors of 700 MWe each would complete the first stage of about 10,000 MWe PHWR programme and plans for setting up of these reactors are discussed

  14. General description of advanced heavy water reactor

    International Nuclear Information System (INIS)

    Kakodkar, A.; Sinha, R.K.; Dhawan, M.L.

    1999-01-01

    Advanced Heavy Water Reactor is a boiling light water cooled, heavy water moderated and vertical pressure tube type reactor with its design optimised for utilisation of thorium for power generation. The core consists of (Th-U 233 )O 2 and (Th-Pu)O 2 fuel with a discharge burn up of 20,000 MWd/Te. This reactor incorporates several features to simplify the design, which eliminate certain systems and components. AHWR design is also optimised for easy replaceability of coolant channels, facilitation of in-service inspection and maintenance and ease of erection. The AHWR design also incorporates several passive systems for performing safety-related functions in the event of an accident. In case of LOCA, emergency coolant is injected through 4 accumulators of 260 m 3 capacity directly into the core. Gravity driven water pool of capacity 6000 m 3 serves to cool the core for 3 days without operator's intervention. Core submergence, passive containment isolation and passive containment cooling are the added features in AHWR. The paper describes the various process systems, core and fuel design, primary components and safety concepts of AHWR. Plant layout and technical data are also presented. The conceptual design of the reactor has been completed, and the detailed design and development is scheduled for completion in the year 2002. (author)

  15. Fatigue and environmentally assisted cracking in light water reactors

    International Nuclear Information System (INIS)

    Kassner, T.F.; Ruther, W.E.; Chung, H.M.; Hicks, P.D.; Hins, A.G.; Park, J.Y.; Shack, W.J.

    1991-12-01

    Fatigue and environmentally assisted cracking of piping, pressure vessels, and core components in light water reactors (LWRs) are important concerns as extended reactor lifetimes are envisaged. The degradation processes include intergranular stress corrosion cracking (IGSCC) of austenitic stainless steel (SS) piping in boiling water reactors (BWRs), and propagation of fatigue or SCC cracks (which initiate in sensitized SS cladding) into low-alloy ferritic steels in BWR pressure vessels. Similar cracking has also occurred in upper shell-to-transition cone girth welds in pressurized water reactor (PWR) steam generator vessels. Another concern is failure of reactor-core internal components after accumulation of relatively high fluence, which has occurred in both BWRs and PWRs. Research during the past year focused on (1) fatigue and SCC of ferritic steels used in piping and in steam generator and reactor pressure vessels, (2) role of chromate and sulfate in simulated BWR water in SCC of sensitized Type 304 SS, and (3) irradiation-assisted SCC in high- and commercial-purity Type 304 SS specimens from control-blade absorber tubes used in two operating BWRs. Failure after accumulation of relatively high fluence has been attributed to radiation-induced segregation (RIS) of elements such as Si, P, Ni, and Cr. This document provides a summary of research progress in these areas

  16. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1982-09-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utlities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation, and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented

  17. Aging management of major light water reactor components

    International Nuclear Information System (INIS)

    Shah, V.N.; Sinha, U.P.; Ware, A.G.

    1992-01-01

    Review of technical literature and field experience has identified stress corrosion cracking as one of the major degradation mechanisms for the major light water reactor components. Three of the stress corrosion cracking mechanisms of current concern are (a) primary water stress corrosion cracking (PWSCC) in pressurized water reactors, and (b) intergranular stress corrosion cracking (IGSCC) and (c) irradiation-assisted stress corrosion cracking (IASCC) in boiling water reactors. Effective aging management of stress corrosion cracking mechanisms includes evaluation of interactions between design, materials, stressors, and environment; identification and ranking of susceptible sites; reliable inspection of any damage; assessment of damage rate; mitigation of damage; and repair and replacement using corrosion-resistant materials. Management of PWSCC includes use of lower operating temperatures, reduction in residual tensile stresses, development of reliable inspection techniques, and use of Alloy 690 as replacement material. Management of IGSCC of nozzle and attachment welds includes use of Alloy 82 as weld material, and potential use of hydrogen water chemistry. Management of IASCC also includes potential use of hydrogen water chemistry

  18. Functional systems of a pressurized water reactor

    International Nuclear Information System (INIS)

    Heinzel, V.

    1982-01-01

    The main topics, discussed in the present paper, are: - Principle design of the reactor coolant system - reactor pressure vessel with internals - containment design - residual heat removal and emergency cooling systems - nuclear component cooling systems - emergency feed water systems - plant electric power supply system. (orig./RW)

  19. Enhancement of efficacy of process water monitors in detecting heavy water leak in steam generator blow down lines

    International Nuclear Information System (INIS)

    Mitra, S.R.; Kohale, S.D.; Parida, B.K.; Gathe, G.D.; Pati, C.K.; Mudgal, B.K.; Niraj; Pawar, S.K.

    2006-01-01

    The Steam Generator (SG) serves as an interface between primary and secondary cycle in Pressurized Heavy Water Reactor (PHWR). Failure of steam generator tubes result in leaking of active heavy water in the secondary closed loop. In Tarapur Atomic Power Station-3 and 4 (TAPS- 3 and 4), Scintillator detectors are provided to detect on line heavy water leakages in SG and moderator heat exchangers by monitoring Nitrogen-16 ( 16 N) and Oxygen-19 ( 19 O) activities. Efficacy of detection of these activities at designed detector position on SG blow down line in presence of background radiation field is analysed theoretically. The count rate of 19 O and 16 N estimated at the detector position inside Reactor Building (RB) shows that detectors only respond to very high leak rates due to presence of high ambient radiation level even though sensitivity is appreciably good. For detector position in RB in the accessible areas and out side the RE containment, the travel time for the blow down feed water becomes moderately and very long respectively resulting in poor sensitivity. However the results show that wherever background levels is low, the efficacy of leak detection becomes considerably better than the results obtained when detector is placed inside RB. The study was validated during the reactor operation by recording the detector count rates due to prevalent ambient radiation level near to the detectors. Subsequently the detectors were relocated in an area inside RB where relocation was feasible, travel time of the blow down feed water was moderate and the area had an relatively low ambient radiation level. This paper discusses the methodology adopted during the study and results obtained during theoretical estimation and practical validation. (author)

  20. Automatic radiometric analyzer for nuclides in nuclear reactor water

    International Nuclear Information System (INIS)

    Kitamura, Masao; Tokoi, Hiromi; Kitaguchi, Hiroshi; Ozawa, Yoshihiro; Urata, Megumu.

    1981-01-01

    Purpose: To shorten the processing time and improve the accuracy for processing water sampled from reactor coolants, as well as simplify the mechanism of the apparatus. Constitution: Reactor water sampled from reactor coolants, after filtered out with insoluble solids, is stored in an ion exchange container. Thereafter, the amount of ion exchanged water is regulated by the coarse measurement of radioactivity concentration by a monitor. Further, ion exchange resins are charged from a resin tank, agitated by gases and dispersed into sampled water. Then, all of the radioactive iodines contained in the sample are collected in the resins. The resins are recovered through evacuation into instrumenting vessels for measurement of radioactivity. Since ion exchange resins are dispersed in the sampled water in this system, the processing time can be shortened. (Ikeda, J.)

  1. LIGHT WATER MODERATED NEUTRONIC REACTOR

    Science.gov (United States)

    Christy, R.F.; Weinberg, A.M.

    1957-09-17

    A uranium fuel reactor designed to utilize light water as a moderator is described. The reactor core is in a tank at the bottom of a substantially cylindrical cross-section pit, the core being supported by an apertured grid member and comprised of hexagonal tubes each containing a pluralily of fuel rods held in a geometrical arrangement between end caps of the tubes. The end caps are apertured to permit passage of the coolant water through the tubes and the fuel elements are aluminum clad to prevent corrosion. The tubes are hexagonally arranged in the center of the tank providing an amulus between the core and tank wall which is filled with water to serve as a reflector. In use, the entire pit and tank are filled with water in which is circulated during operation by coming in at the bottom of the tank, passing upwardly through the grid member and fuel tubes and carried off near the top of the pit, thereby picking up the heat generated by the fuel elements during the fission thereof. With this particular design the light water coolant can also be used as the moderator when the uranium is enriched by fissionable isotope to an abundance of U/sup 235/ between 0.78% and 2%.

  2. EPRI program in water reactor safety

    International Nuclear Information System (INIS)

    Loewenstein, W.B.; Gelhaus, F.; Gopalakrishnan, A.

    1975-01-01

    The basis for EPRI's water reactor safety program is twofold. First is compilation and development of fundamental background data necessary for quantified light-water reactor (LWR) safety assurance appraisals. Second is development of realistic and experimentally bench-marked analytical procedures. The results are expected either to confirm the safety margins in current operating parameters, and to identify overly conservative controls, or, in some cases, to provide a basis for improvements to further minimize uncertainties in expected performance. Achievement of these objectives requires the synthesis of related current and projected experimental-analytical projects toward establishment of an experimentally-based analysis for the assurance of safety for LWRs

  3. Safety characteristics analysis of nuclear power plants with PHWR PT; Analiza sigurnosnh karakteristika nuklearnih elektrana sa reaktorima PHWR-PT tipa

    Energy Technology Data Exchange (ETDEWEB)

    Stosic, Z [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1983-07-01

    The paper deals with analysis of basic safety characteristics of heavy water Candu reactor. Inherent safety characteristics, r/a material inventory, systematization of normal abnormal and transient conditions, safety systems and availability analysis are considered. (author)

  4. EPR (European Pressurized water Reactor) The advanced nuclear reactor

    International Nuclear Information System (INIS)

    2004-01-01

    Nuclear energy, which provides a steady supply of electricity at low cost, has its rightful place in the energy mix of the 21. century, which puts the emphasis on sustainable development. The EPR is the only 3. generation reactor under construction today. It is an evolutionary reactor that represents a new generation of pressurized water reactors with no break in the technology used for the most recent models. The EPR was developed by Framatome and Siemens, whose nuclear activities were combined in January 2001 to form Framatome ANP, a subsidiary of AREVA and Siemens. EDF and the major German electricity companies played an active part in the project. The safety authorities of the two countries joined forces to bring their respective safety standards into line and draw up joint design rules for the new reactor. The project had three objectives: meet the requirements of European utilities, comply with the safety standards laid down by the French safety authority for future pressurized water reactors, in concert with its German counterpart, and make nuclear energy even more competitive than energy generated using fossil fuels. The EPR can guarantee a safe, inexpensive electricity supply, without adding to the greenhouse effect. It meets the requirements of the safety authorities and lives up to the expectations of electricity utilities. This document presents the main characteristics of the EPR, and in particular the additional measures to prevent the occurrence of events likely to damage the core, the leak-tight containment, the measures to reduce the exposure of operating and maintenance personnel, the solutions for an even greater protection of the environment. The foreseen development of the EPR in France and abroad (Finland, China, the United States) is summarized

  5. Analysis of thermal fatigue events in light water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Okuda, Yasunori [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan)

    2000-09-01

    Thermal fatigue events, which may cause shutdown of nuclear power stations by wall-through-crack of pipes of RCRB (Reactor Coolant Pressure Boundary), are reported by licensees in foreign countries as well as in Japan. In this paper, thermal fatigue events reported in anomalies reports of light water reactors inside and outside of Japan are investigated. As a result, it is clarified that the thermal fatigue events can be classified in seven patterns by their characteristics, and the trend of the occurrence of the events in PWRs (Pressurized Water Reactors) has stronger co-relation to operation hours than that in BWRs (Boiling Water Reactors). Also, it is concluded that precise identification of locations where thermal fatigue occurs and its monitoring are important to prevent the thermal fatigue events by aging or miss modification. (author)

  6. Full length channel Pressure Tube sagging under completely voided full length pressure tube of an Indian PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Negi, Sujay, E-mail: negi.sujay@gmail.com [Indian Institute of Technology, Roorkee 247667 (India); Kumar, Ravi, E-mail: ravikfme@gmail.com [Indian Institute of Technology, Roorkee 247667 (India); Majumdar, P., E-mail: pmajum@barc.gov.in [Bhabha Atomic Research Centre, Mumbai 400085 (India); Mukopadhyay, D., E-mail: dmukho@barc.gov.in [Bhabha Atomic Research Centre, Mumbai 400085 (India)

    2017-03-15

    Highlights: • At 16 kW/m input, thermal stability was attained at 595 °C, without PT-CT contact. • At 20 kW/m step input, PT-CT contact occurred at 637 °C near bottom-center of the tube. • PT integrity was maintained throughout the experiment. - Abstract: An experimental investigation was conducted to simulate the sagging behavior of a full length Pressure Tube of a channel of 220 MWe Indian PHWR. The investigation aimed to recreate a condition resembling Loss of Coolant Accident (LOCA) with Emergency Core Cooling System (ECCS) failure in a nuclear power plant. A full length channel assembly immersed in moderator was subjected to electrical resistance heating of Pressure Tube (PT) to simulate the residual heat after shutting down of reactor. The temperature of PT started rising and the contact between PT and CT was established at the center of the tube where average bottom temperature was 637 °C. The integrity of PT was maintained throughout the experiment and the PT heat up was arrested on contact with the CT due to transfer of heat to the moderator.

  7. The future 700 MWe pressurized heavy water reactor

    International Nuclear Information System (INIS)

    Bhardwaj, S.A.

    2006-01-01

    The design of a 700 MWe pressurized heavy water reactor has been developed. The design is based on the twin 540 MWe reactors at Tarapur of which the first unit has been made critical in less than 5 years from construction commencement. In the 700 MWe design boiling of the coolant, to a limited extent, has been allowed near the channel exit. While making the plant layout more compact, emphasis has been on constructability. Saving in capital cost of about 15%, over the present units, is expected. The paper describes salient design features of 700 MWe pressurized heavy water reactor

  8. Status of control assembly materials in Indian water reactors

    International Nuclear Information System (INIS)

    Date, V.G.; Kulkarni, P.G.

    2000-01-01

    India's present operating water cooled power reactors comprise boiling water reactors of Tarapur Atomic Power Station (TAPS) and pressurized heavy water reactors (PHWRs) at Kota (RAPS), Kalpakkam (MAPS), Narora (NAPS) and Kakrapara (KAPS). Boiling water reactors of TAPS use boron carbide control blades for control of power as well as for shut down (scram). PHWRs use boron steel and cobalt absorber rods for power control and Cd sandwiched shut off rods (primary shut down system) and liquid poison rods (secondary shut down system) for shut down. In TAPS, Gadolinium rods (burnable poison rods) are also incorporated in fuel assembly for flux flattening. Boron carbide control blades and Gadolinium rods for TAPS, cobalt absorber rods and shut down assemblies for PHWRs are fabricated indigenously. Considerable development work was carried out for evolving material specifications, component and assembly drawings, and fabrication processes. Details of various control and shut off assemblies being fabricated currently are highlighted in the paper. (author)

  9. Determination of overall decontamination factors for common impurity elements in PHWR spent fuel reprocessing

    International Nuclear Information System (INIS)

    Pant, D.K.; Bhalerao, B.A.; Gupta, K.K.; Kulkarni, P.G.; Gurba, P.B.; Janardan, P.; Changrani, R.D.; Dey, P.K.

    2009-01-01

    An attempt has been made to determine overall decontamination factors for elemental impurities normally encountered in the U 3 O 8 product obtained by reprocessing of PHWR spent fuel. The solution obtained by dissolution of spent fuel and corresponding U 3 O 8 product were analyzed for 24 elemental impurities by ICP-AES for this purpose. Decontamination factors achieved for major neutron poisons are in the range of 200-400. (author)

  10. Coolant mixing in pressurized water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hoehne, T; Grunwald, G

    1998-10-01

    The behavior of PWRs during cold water or boron dilution transients is strongly influenced by the distribution of coolant temperature and boron concentration at the core inlet. This distribution is the needed input to 3-dimensional neutron kinetics to calculate the power distribution in the core. It mainly depends on how the plugs of cold or unborated water formed in a single loop are mixed in the downcomer and in the lower plenum. To simulate such mixture phenomena requires the application of 3-dimensional CFD (computational fluid dynamics) codes. The results of the simulation have to be validated against mixture experiments at scaled facilities. Therefore, in the framework of a research project funded by BMBF, the institute creates a 1:5 mixture facility representing first the geometry of a German pressurized water reactor and later the European Pressurized Water Reactor (EPR) geometry. The calculations are based on the CFD Code CFX-4. (orig.)

  11. Boiling water reactor

    International Nuclear Information System (INIS)

    Matsumoto, Tomoyuki; Inoue, Kotaro; Ishida, Masayoshi.

    1975-01-01

    Object: To connect a feedwater pipe to a recycling pipe line, the recycling pipe line being made smaller in diameter, thereby minimizing loss of coolant resulting from rupture of the pipe and improving safety against trouble of coolant loss. Structure: A feedwater pipe is directly connected to a recycling pipe line before a booster pump, and a mixture of recycling water and feedwater is increased in pressure by the booster pump, after which it is introduced into a jet pump in the form of water for driving the jet pump to suck surrounding water causing it to be flown into the core. In accordance with the abovementioned structure, since the flow of feedwater can be used as a part of water for driving the jet pump, the flow within the recycling pipe line may be decreased so that the recycling pipe line can be made smaller in diameter to reduce the flow of coolant in the reactor, which flows out when the pipe is ruptured. (Furukawa, Y.)

  12. Vaporization Rate Analysis of Primary Cooling Water from Reactor PUSPATI TRIGA (RTP) Tank

    International Nuclear Information System (INIS)

    Tonny Anak Lanyau; Mohd Fazli Zakaria; Yahya Ismail

    2011-01-01

    Primary cooling system consists of pumps, heat exchangers, probes, a nitrogen-16 diffuser and associated valves is connected to the reactor TRIGA PUSPATI (RTP) tank by aluminium pipes. Both the primary cooling system and the reactor tank is filled with demineralized light water (H 2 O), which serves as a coolant, moderator as well as shielding. During reactor operation, vaporization in the reactor tank will reduce the primary water and contribute to the formation of vapor in the reactor hall. The vaporization may influence the function of the water subsequently may affect the safety of the reactor operation. It is essential to know the vaporization rate of the primary water to ensure its functionality. This paper will present the vaporization rate of the primary cooling water from the reactor tank and the influence of temperature of the water in the reactor tank to the vaporization rate. (author)

  13. Three core concepts for producing uranium-233 in commercial pressurized light water reactors for possible use in water-cooled breeder reactors

    International Nuclear Information System (INIS)

    Conley, G.H.; Cowell, G.K.; Detrick, C.A.; Kusenko, J.; Johnson, E.G.; Dunyak, J.; Flanery, B.K.; Shinko, M.S.; Giffen, R.H.; Rampolla, D.S.

    1979-12-01

    Selected prebreeder core concepts are described which could be backfit into a reference light water reactor similar to current commercial reactors, and produce uranium-233 for use in water-cooled breeder reactors. The prebreeder concepts were selected on the basis of minimizing fuel system development and reactor changes required to permit a backfit. The fuel assemblies for the prebreeder core concepts discussed would occupy the same space envelope as those in the reference core but contain a 19 by 19 array of fuel rods instead of the reference 17 by 17 array. An instrument well and 28 guide tubes for control rods have been allocated to each prebreeder fuel assembly in a pattern similar to that for the reference fuel assemblies. Backfit of these prebreeder concepts into the reference reactor would require changes only to the upper core support structure while providing flexibility for alternatives in the type of fuel used

  14. Method of operating water cooled reactor with blanket

    International Nuclear Information System (INIS)

    Suzuki, Katsuo.

    1988-01-01

    Purpose: To increase the production amount of fissionable plutonium by increasing the burnup degree of blanket fuels in a water cooled reactor with blanket. Method: Incore insertion assemblies comprising water elimination rods, fertile material rods or burnable poison rods are inserted to those fuel assemblies at the central portion of the reactor core that are situated at the positions not inserted with control rods in the earlier half of the operation cycle, while the incore reactor insertion assemblies are withdrawn at the latter half of the operation cycle of a nuclear reactor. As a result, it is possible to increase the power share of the blanket fuels and increase the fuel burnup degree to thereby increase the production amount of fissionable plutonium. Furthermore, at the initial stage of the cycle, the excess reactivity of the reactor can be suppressed to decrease the reactivity control share on the control rod. At the final stage of the cycle, the excess reactivity of the reactor core can be increased to improve the cycle life. (Kamimura, M.)

  15. Evaluation of tritiated water retention capacity of fusion reactor concrete building

    International Nuclear Information System (INIS)

    Numata, S.; Fujii, Y.; Okamoto, M.

    1992-01-01

    In this paper the diffusion of tritiated water vapor into concrete walls is studied to evaluate tritiated water retention capacity of a fusion reactor concrete building. Using a model of the tritiated water diffusion determined form experimental results, depth profiles of tritiated water in concrete are calculated in the case of being exposed to air containing tritiated water vapor during the normal operational condition of a fusion reactor. A 0.5-m-thick concrete is sufficient for reactor hall walls from a viewpoint of the tritium containment

  16. Graphite-water steam-generating reactor in the USSR

    Energy Technology Data Exchange (ETDEWEB)

    Dollezhal, N A [AN SSSR, Moscow

    1981-10-01

    One of the types of power reactor used in the USSR is the graphite-water steam-generating reactor RBMK. This produces saturated steam at a pressure of 7MPa. Reactors giving 1GWe each have been installed at the Leningrad, Kursk, Chernobyl and other power stations. Further stations using reactors of this type are being built. A description is given of the fuel element design, and of the layout of the plant. The main characteristics of RBMK reactors using fuel of rated and higher enrichment are listed.

  17. Thermohydraulic analysis of pressurized water reactors

    International Nuclear Information System (INIS)

    Veloso, M.A.

    1980-01-01

    The computer program PANTERA is applied in the thermo-hydraulic analysis of Pressurized Water Reactor Cores (PWR). It is a version of COBRA-IIIC in which a new thermal conduction model for fuel rods was introduced. The results calculated by this program are compared with experimental data obtained from bundles of fuel rods, simulating reactor conditions. The validity of the new thermal model is checked too. The PANTERA code, through a simplified procedure of calculation, is used in the thermo-hydraulic analysis of Indian Point, Unit 2, reactor core, in stationary conditions. The results are discussed and compared with design data. (Autor) [pt

  18. Safety of light water reactors. Risks of nuclear technology

    International Nuclear Information System (INIS)

    Veser, Anke; Schlueter, Franz-Hermann; Raskob, Wolfgang; Landman, Claudia; Paesler-Sauer, Juergen; Kessler, Guenter

    2012-01-01

    The book on the safety of light-water reactors includes the following chapters: Part I: Physical and technical safety concept of actual German and future European light-water reactors: (1) Worldwide operated nuclear power plants in 2011, (2) Some reactor physical fundamentals. (3) Nuclear power plants in Germany. (4) Radioactive exposure due to nuclear power plants. (5) Safety concept of light-water reactors. (6) Probabilistic analyses and risk studies. (7) Design of light-water reactors against external incidents. (8) Risk comparison of nuclear power plants and other energy systems. (9) Evaluation of risk studies using the improved (new) safety concept for LWR. (19) The severe reactor accidents of Three Mile Island, Chernobyl and Fukushima. Part II: Safety of German LWR in case of a postulated aircraft impact. (11) Literature. (12) Review of requirements and actual design. (13) Incident scenarios. (14) Load approach for aircraft impact. (15) Demonstration of the structural behavior in case of aircraft impact. (16) Special considerations. (17) Evaluation of the safety state of German and foreign nuclear power plants. Part III: ROSOS as example for a computer-based decision making support system for the severe accident management. (19) Literature. (20) Radiological fundamentals, accident management, modeling of the radiological situation. (21) The decision making support system RODOS. (22) RODOS and the Fukushima accident. (23) Recent developments in the radiological emergency management in the European frame.

  19. Technical report on operating experience with boiling water reactor offgas systems

    International Nuclear Information System (INIS)

    Lo, R.; Barrett, L.; Grimes, B.; Eisenhut, D.

    1978-03-01

    Over 100 reactor years of Boiling Water Reactor (BWR) operating experience have been accumulated since the first commercial operation of BWRs. A number of incidents have occurred involving the ''offgas'' of these Boiling Water Reactors. This report describes the generation and processing of ''offgas'' in Boiling Water Reactors, the safety considerations regarding systems processing the ''offgas'', operating experience involving ignitions or explosions of ''offgas'' and possible measures to reduce the likelihood of future ignitions or explosions and to mitigate the consequences of such incidents should they occur

  20. Zeolite Membrane Reactor for Water Gas Shift Reaction for Hydrogen Production

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Jerry Y.S. [Arizona State Univ., Mesa, AZ (United States)

    2013-01-29

    Gasification of biomass or heavy feedstock to produce hydrogen fuel gas using current technology is costly and energy-intensive. The technology includes water gas shift reaction in two or more reactor stages with inter-cooling to maximize conversion for a given catalyst volume. This project is focused on developing a membrane reactor for efficient conversion of water gas shift reaction to produce a hydrogen stream as a fuel and a carbon dioxide stream suitable for sequestration. The project was focused on synthesizing stable, hydrogen perm-selective MFI zeolite membranes for high temperature hydrogen separation; fabricating tubular MFI zeolite membrane reactor and stable water gas shift catalyst for membrane reactor applications, and identifying experimental conditions for water gas shift reaction in the zeolite membrane reactor that will produce a high purity hydrogen stream. The project has improved understanding of zeolite membrane synthesis, high temperature gas diffusion and separation mechanisms for zeolite membranes, synthesis and properties of sulfur resistant catalysts, fabrication and structure optimization of membrane supports, and fundamentals of coupling reaction with separation in zeolite membrane reactor for water gas shift reaction. Through the fundamental study, the research teams have developed MFI zeolite membranes with good perm-selectivity for hydrogen over carbon dioxide, carbon monoxide and water vapor, and high stability for operation in syngas mixture containing 500 part per million hydrogen sulfide at high temperatures around 500°C. The research teams also developed a sulfur resistant catalyst for water gas shift reaction. Modeling and experimental studies on the zeolite membrane reactor for water gas shift reaction have demonstrated the effective use of the zeolite membrane reactor for production of high purity hydrogen stream.

  1. Design of the Demineralized Water Make-up Line to Maintain the Normal Pool Water Level of the Reactor Pool in the Research Reactor

    International Nuclear Information System (INIS)

    Yoon, Hyun Gi; Choi, Jung Woon; Yoon, Ju Hyeon; Chi, Dae Young

    2012-01-01

    In many research reactors, hot water layer system (HWLS) is used to minimize the pool top radiation level. Reactor pool divided into the hot water layer at the upper part of pool and the cold part below the hot water layer with lower temperature during normal operation. Water mixing between these layers is minimized because the hot water layer is formed above cold water. Therefore the hot water layer suppresses floatation of cold water and reduces the pool top radiation level. Pool water is evaporated form the surface to the building hall because of high temperature of the hot water layer; consequently the pool level is continuously fallen. Therefore, make-up water is necessary to maintain the normal pool level. There are two way to supply demineralized water to the pool, continuous and intermittent methods. In this system design, the continuous water make-up method is adopted to minimize the disturbance of the reactor pool flow. Also, demineralized water make-up is connected to the suction line of the hot water layer system to raise the temperature of make-up water. In conclusion, make-up demineralized water with high temperature is continuously supplied to the hot water layer in the pool

  2. Towards intrinsically safe light-water reactors

    International Nuclear Information System (INIS)

    Hannerz, K.

    1983-02-01

    The reactor-safety issue is one of the principal problems threatening the future of the nuclear option, at least in participatory democracies. It has contributed to widespread public distrust and is the direct cause of the escalation in design complexity and quality assurance requirements that are rapidly eroding the competitive advantage of nuclear power. Redesign of the light-water reactor can eliminate those features that leave it open to public distrust and obstructive intervention. This redesign appears feasible within the realm of proven technology in those fields (fuels, materials, water chemistry, waste technology, etc.) in which extended operating experience is essential for confidence in system performance. A pressurized water reactor outline design developed to achieve the above goal is presented. The key feature is the design of the primary system extracting heat from the core so that the latter is protected from damage caused by any credible system failure or any destructive intervention from the outside by either violent means (up to and including nonnuclear warfare) or by mistaken or malicious use of the plant control systems. Such a design objective can be achieved by placing the entire primary circulation system in a large pressurized pool of cold water with a high boric acid content. Enough water is provided in the pool to allow core-decay-heat removal by evaporation for at least one week following any incident with no cooling systems operating. Subsequently it is assumed that a supply of further water (a few cubic meters per hour) from the outside can be arranged, even without the presence of the plant operating personnel

  3. Development of a portable heavy-water leak sensor based on laser absorption spectroscopy

    International Nuclear Information System (INIS)

    Lee, Lim; Park, Hyunmin; Kim, Taek-Soo; Kim, Minho; Jeong, Do-Young

    2016-01-01

    Highlights: • We developed a compact and portable laser sensor for a detection of heavy water leakage. • The sensor is wearable and also easy to use to search for the leak point. • It is sensitive enough to find invisible very tiny leaks. - Abstract: A compact and portable leak sensor based on cavity enhanced absorption spectroscopy has been newly developed for a detection of heavy water leakage which may happen in the facilities using heavy water such as pressurized heavy water reactor (PHWR). The developed portable sensor is suitable as an individual instrument for the measuring leak rate and finding the leak location because it is sufficiently compact in size and weight and operated by using an internal battery. In the performance test, the minimum detectable leak rate was estimated as 0.05 g/day from the calibration curve. This new sensor is expected to be a reliable and promising device for the detection of heavy water leakage since it has advantages on real-time monitoring and early detection for nuclear safety.

  4. The Sensitivity Analysis of Axial Pressure Tube Creep Profile for Dryout Power in PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, Euiseung; Kim, Youngae [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The Stern Laboratory performed the CHF tests with only one axial pressure tube creep profile per 3.3%, 5.1% peak crept channel and made CHF correlation including creep factor from the CHF test results. Wolsong nuclear power plants also have utilized the same CHF correlation derived by CNL. Pressure tube diameter creep rate is function of fast neutron, coolant temperature, and coolant pressure in a channel. It means that various axial pressure tube creep profiles exist in PHWR due to the history of operating conditions. Usually, CHF correlation is used during ROP(Regional Overpower Protection) Trip Setpoint Analysis or Safety Analysis in PHWR. The sensitivity analysis for CHF effects using various creep profiles is needed. This paper summarizes the comparison results of dryout power between CHF test creep profile and estimated creep profiles of Wolsong units. The effect of axial pressure tube creep profile for dryout power in fuel channel is evaluated by using Stern Lab. CHF test creep profile and 380 channel creep profiles of Wolsong. The dryout powers at 3.3% and 5.1% test conditions are slightly smaller when using 380 Wolsong channels creep profiles. These also show that the simulated dryout powers maintain consistency regardless of flow conditions.

  5. Measuring device for water quality at reactor bottom

    Energy Technology Data Exchange (ETDEWEB)

    Urata, Hidehiro; Takagi, Jun-ichi

    1995-10-27

    The present invention concerns measurement for water quality at the bottom of a reactor of a BWR type plant, in which reactor water is sampled and analyzed in a state approximate to conditions in a pressure vessel. Based on the result, hydrogen injection amount is controlled during hydrogen injection operation. Namely, a monitor for water quality is disposed to a sampling line in communication with the bottom of a pressure vessel. A water quality monitor is disposed to a drain sampling line in communication with the bottom of the pressure vessel. A corrosion potentiometer is disposed to the pressure sampling line or the drain sampling line. A dissolved oxygen measuring device is disposed to the pressure vessel sampling line or the drain sampling line. With such a constitution, the reactor water can be sampled and analyzed in a state approximate to the conditions in the pressure vessel. In addition, signals from the water quality monitor are inputted to a hydrogen injection amount control device. As a result, the amount of hydrogen injected to primary coolants can be controlled in a state approximate to the conditions in the pressure vessel. (I.S.).

  6. Measuring device for water quality at reactor bottom

    International Nuclear Information System (INIS)

    Urata, Hidehiro; Takagi, Jun-ichi.

    1995-01-01

    The present invention concerns measurement for water quality at the bottom of a reactor of a BWR type plant, in which reactor water is sampled and analyzed in a state approximate to conditions in a pressure vessel. Based on the result, hydrogen injection amount is controlled during hydrogen injection operation. Namely, a monitor for water quality is disposed to a sampling line in communication with the bottom of a pressure vessel. A water quality monitor is disposed to a drain sampling line in communication with the bottom of the pressure vessel. A corrosion potentiometer is disposed to the pressure sampling line or the drain sampling line. A dissolved oxygen measuring device is disposed to the pressure vessel sampling line or the drain sampling line. With such a constitution, the reactor water can be sampled and analyzed in a state approximate to the conditions in the pressure vessel. In addition, signals from the water quality monitor are inputted to a hydrogen injection amount control device. As a result, the amount of hydrogen injected to primary coolants can be controlled in a state approximate to the conditions in the pressure vessel. (I.S.)

  7. Radioactive waste management practices with KWU-boiling water reactors

    International Nuclear Information System (INIS)

    Queiser, H.

    1976-01-01

    A Kraftwerk Union boiling water reactor is used to demonstrate the reactor auxiliary systems which are applied to minimize the radioactive discharge. Based on the most important design criteria the philosophy and function of the various systems for handling the off-gas, ventilation air, waste water and concentrated waste are described. (orig.) [de

  8. Argentine activities within the IWGATWR framework

    International Nuclear Information System (INIS)

    Antunez, H.M.

    1991-01-01

    The status of power reactors and nuclear activity in Argentina for the period 1988-1990 are described. The reactor shutdown at the Central Nuclear Atucha I and repair works are discussed. Joint venture of the Comision Nacional de Energia Atomica and KWU developments are reported, including the conceptual design of an additional heat sink for pressurized water reactors, a feasibility analysis of the Co-60 production in pressure vessel PHWRs and a study of severe postulated accidents for pressure vessel PHWR. 11 refs, 4 figs

  9. Calculation of photon dose for Dalat research reactor in case of loss of reactor tank water

    International Nuclear Information System (INIS)

    Le Vinh Vinh; Huynh Ton Nghiem; Nguyen Kien Cuong

    2007-01-01

    Photon sources of actinides and fission products were estimated by ORIGEN2 code with the modified cross-section library for Dalat research reactor (DRR) using new cross-section generated by WIMS-ANL code. Photon sources of reactor tank water calculated from the experimental data. MCNP4C2 with available non-analog Monte Carlo model and ANSI/ANL-6.1.1-1977 flux-to-dose factors were used for dose estimation. The agreement between calculation results and those of measurements showed that the methods and models used to get photon sources and dose were acceptable. In case the reactor water totally leaks out from the reactor tank, the calculated dose is very high at the top of reactor tank while still low in control room. In the reactor hall, the operation staffs can access for emergency works but with time limits. (author)

  10. Analysis of an accelerator-driven subcritical light water reactor

    International Nuclear Information System (INIS)

    Kruijf, W.J.M. de; Wakker, P.H.; Wetering, T.F.H. van de; Verkooijen, A.H.M.

    1997-01-01

    An analysis of the basic characteristics of an accelerator-driven light water reactor has been made. The waste in the nuclear fuel cycle is considerably less than in the light water reactor open fuel cycle. This is mainly caused by the use of equilibrium nuclear fuel in the reactor. The accelerator enables the use of a fuel composition with infinite multiplication factor k ∞ < 1. The main problem of the use of this type of fuel is the strongly peaked flux distribution in the reactor core. A simple analytical model shows that a large core is needed with a high peak power factor in order to generate net electric energy. The fuel in the outer regions of the reactor core is used very poorly. 7 refs., 4 figs., 1 tab

  11. Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors

    International Nuclear Information System (INIS)

    Vito, D.J.

    1980-12-01

    The Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors (CE-STS) is a generic document prepared by the US NRC for use in the licensing process of current Combustion Engineering Pressurized Water Reactors. The CE-STS sets forth the limits, operating conditions, and other requirements applicable to nuclear reactor facility operation as set forth by Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public. The document is revised periodically to reflect current licensing requirements

  12. Power control device for heavy water moderated reactor

    International Nuclear Information System (INIS)

    Matsushima, Hidesuke; Masuda, Hiroyuki.

    1978-01-01

    Purpose: To improve self controllability of a nuclear power plant, as well as enable continuous power level control by a controlled flow of moderators in void pipes provided in a reactor core. Constitution: Hollow void pipes are provided in a reactor core to which a heavy water recycle loop for power control, a heavy water recycle pump for power control, a heavy water temperature regulator and a heavy water flow rate control valve for power control are connected in series to constitute a heavy water recycle loop for flowing heavy water moderators. The void ratio in each of the void pipes are calculated by a process computer to determine the flow rate and the temperature for the recycled heavy water. Based on the above calculation result, the heavy water temperature regulator is actuated by way of a temperature setter at the heavy water inlet and the heavy water flow rate is controlled by the actuation of the heavy water flow rate control valve. (Kawakami, Y.)

  13. Advantages of liquid fluoride thorium reactor in comparison with light water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Bahri, Che Nor Aniza Che Zainul, E-mail: anizazainul@gmail.com; Majid, Amran Ab.; Al-Areqi, Wadeeah M. [Nuclear Science Program, School of Applied Physics, Faculty of Science and Technology, Universiti Kebangsaan Malaysia, 43600 UKM Bangi, Selangor (Malaysia)

    2015-04-29

    Liquid Fluoride Thorium Reactor (LFTR) is an innovative design for the thermal breeder reactor that has important potential benefits over the traditional reactor design. LFTR is fluoride based liquid fuel, that use the thorium dissolved in salt mixture of lithium fluoride and beryllium fluoride. Therefore, LFTR technology is fundamentally different from the solid fuel technology currently in use. Although the traditional nuclear reactor technology has been proven, it has perceptual problems with safety and nuclear waste products. The aim of this paper is to discuss the potential advantages of LFTR in three aspects such as safety, fuel efficiency and nuclear waste as an alternative energy generator in the future. Comparisons between LFTR and Light Water Reactor (LWR), on general principles of fuel cycle, resource availability, radiotoxicity and nuclear weapon proliferation shall be elaborated.

  14. Method of controlling the water quality in nuclear reactors

    International Nuclear Information System (INIS)

    Ibe, Hidefumi.

    1985-01-01

    Purpose: To obtain a simple and reliable water quality calculation system and water quality control method based thereon for the entire primary coolant circuits in BWR type reactors. Method: In a method of controlling the water quality of the reactor water by injecting hydrogen into the primary coolant circuits of a nuclear reactor, by utilizing a first linear relationship established between the concentration of oxygen and hydrogen in the main steam system and the concentration of radiolysis products in the reactor core and separators and mixing plenum portions, each of the above-mentioned concentrations is calculated from the concentrations for hydrogen or oxygen. Further, by utilizing the first linear relationship established between the concentrations for the oxygen and hydrogen in the recycling system and the concentration of the radiolysis products in the system from the downcomer to the lower plenum portion, the above-mentioned concentration is calculated from the concentration for oxygen and hydrogen. Then, the hydrogen injection rate into the primary coolant system is determined such that the calculated value takes an aimed value. (Ikeda, J.)

  15. Supplementary shutdown system of 220 MWe standard PHWR in India

    International Nuclear Information System (INIS)

    Muktibodh, U.C.

    1997-01-01

    The design objective of the shutdown system is to make the reactor subcritical and hold it in that state for an extended period of time. This objective must be realised under all anticipated operational occurrences and postulated abnormal conditions even during most reactive state of the core. PHWR design criteria for shutdown stipulates requirement of two independent diverse and fast acting shutdown systems, either of which acting alone should meet the above objectives. This requirement would normally call for a large number of reactivity mechanism penetrations into the calandria. From the point of view of space availability at the reactivity mechanism area on top of calandria, for the relatively small core of 220 MWe PHWRs, and ease of maintenance realisation of the total worth by either of the shutdown systems acting alone was difficult. To overcome this engineering constraint and at the same time to satisfy the design criteria, a unique approach to meet the reactivity demands for shutdown was adopted. The reactivity requirements of the shutdown consists of fast and slow reactivity changes. For the shutdown system of 220 MWe PHWRs, the approach of realizing fast reactivity changes with dual redundant, diverse, fast acting shutdown systems aided by a slow acting shutdown system to counter delayed reactivity changes was conceived. The supplementary slow acting shutdown system is called upon to act after actuation of either of the two redundant fast acting systems and is referred to as Liquid Poison Injection System (LPIS). The system adds bulk amount of neutron poison (boric acid), equivalent to 45 mk, directly into the moderator through two nozzles in calandria using pneumatic pressure. This paper describes the design of LPIS as envisaged for the standardised 220 MWe PHWRs. (author)

  16. Predicted effect of power uprating on the water chemistry of commercial boiling water reactors

    International Nuclear Information System (INIS)

    Yeh, Tsung-Kuang; Wang, Mei-Ya; Chu, Charles F.; Chang Ching

    2009-01-01

    The approach of power uprating has been adopted by operators of light water reactors in the past few decades in order to increase the power generation efficiency of nuclear reactors. The power uprate strategy is apparently applicable to the three nuclear reactors in Taiwan as well. When choosing among the three types of power uprating, measurement uncertainty, stretch power uprating, and extended power uprating, a deliberate and thorough evaluation is required before a final decision and an optimal selection can be made. One practical way of increasing the reactor power is to deliberately adjust the fuel loading pattern and the control rod pattern and thus to avoid replacing the primary coolant pump with a new one of larger capacity. The power density of the reactor will increase with increasing power, but the mass flow rate in the primary coolant circuit (PCC) of a light water reactor will slightly increase (usually by less than 5 %) or even remain unchanged. Accordingly, an uprated power would induce higher neutron and gamma photon dose rates in the reactor coolant but have a minor or no effect on the mass flow rate of the primary coolant. The radiolysis product concentrations and the electrochemical corrosion potential (ECP) values differ largely in the PCC of a boiling water reactor (BWR). It is very difficult to measure the water chemistry data directly at various locations of an actual reactor. Thus the impact of power uprating on the water chemistry of a BWR operating under hydrogen water chemistry (HWC) can only be theoretically evaluated through computer modelling. In this study, the DEMACE computer code was modified to investigate the impact of power uprating on the water chemistry under a fixed mass flow rate in the primary coolant circuit of a BWR/6 type plant. Simulations were carried out for hydrogen concentrations in feedwater ranging from 0.0 to 2.0 mg . kg -1 and for power levels ranging from 100 % to 120 %. The responses of water chemistry and ECP

  17. Developmental Light-Water Reactor Program

    International Nuclear Information System (INIS)

    Forsberg, C.W.

    1989-12-01

    This report summarizes the progress of the Developmental Light-Water Reactor (DLWR) Program at Oak Ridge National Laboratory in FY 1989. It also includes (1) a brief description of the program, (2) definition of goals, (3) earlier achievements, and (4) proposed future activities

  18. Estimation of reactor pool water temperature after shutdown in JRR-3M

    International Nuclear Information System (INIS)

    Yagi, Masahiro; Sato, Mitsugu; Kakefuda, Kazuhiro

    1999-01-01

    The reactor pool water temperature increasing by the decay heat was estimated by calculation. The reactor pool water temperature was calculated by increased enthalpy that was estimated by the reactor decay heat, the heat released from the reactor biological shielding concrete, reactor pool water surface, the heat conduction from the canal and the core inlet piping. These results of calculation were compared with the past measured data. As the results of estimation, after the JRR-3M shutdown, the calculated reactor pool temperature first increased sharply. This is because the decay heat was the major contribution. And then, rate of increased reactor pool temperature decreased. This is because the ratio of heat released from reactor biological shielding concrete and core inlet piping to the decay heat increased. Besides, the calculated reactor pool water temperature agreed with the past measured data in consequence of correcting the decay heat and the released heat. The corrected coefficient k 1 of decay heat was 0.74 - 0.80. And the corrected coefficient k 2 of heat released from the reactor biological shielding concrete was 3.5 - 4.5. (author)

  19. Device for preventing cooling water from flowing out of reactor

    International Nuclear Information System (INIS)

    Chinen, Masanori; Kotani, Koichi; Murase, Michio.

    1976-01-01

    Object: To provide emergency cooling system, which can prevent cooling water bearing radioactivity from flowing to the outside of the reactor at the time of breakage of feedwater pipe, thus eliminating the possibility of exposure of the fuel rod to provide high reliability and also reducing the possibility of causing radioactive pollution. Structure: The device for preventing cooling water from flowing out from the reactor features a jet nozzle inserted in a feedwater pipe adjacent to the inlet or outlet thereof immediately before the reactor container. The nozzle outlet is provided in the vicinity of the reactor wall and in a direction opposite to the direction of out-flow, and water supplied from a high pressure pump is jetted from it. (Nakamura, S.)

  20. Corrosion of research reactor aluminium clad spent fuel in water

    International Nuclear Information System (INIS)

    2009-12-01

    A large variety of research reactor spent fuel with different fuel meats, different geometries and different enrichments in 235 U are presently stored underwater in basins located around the world. More than 90% of these fuels are clad in aluminium or aluminium based alloys that are notoriously susceptible to corrosion in water of less than optimum quality. Some fuel is stored in the reactor pools themselves, some in auxiliary pools (or basins) close to the reactor and some stored at away-from-reactor pools. Since the early 1990s, when corrosion induced degradation of the fuel cladding was observed in many of the pools, corrosion of research reactor aluminium clad spent nuclear fuel stored in light water filled basins has become a major concern, and programmes were implemented at the sites to improve fuel storage conditions. The IAEA has since then established a number of programmatic activities to address corrosion of research reactor aluminium clad spent nuclear fuel in water. Of special relevance was the Coordinated Research Project (CRP) on Corrosion of Research Reactor Aluminium Clad Spent Fuel in Water (Phase I) initiated in 1996, whose results were published in IAEA Technical Reports Series No. 418. At the end of this CRP it was considered necessary that a continuation of the CRP should concentrate on fuel storage basins that had demonstrated significant corrosion problems and would therefore provide additional insight into the fundamentals of localized corrosion of aluminium. As a consequence, the IAEA started a new CRP entitled Corrosion of Research Reactor Aluminium Clad Spent Fuel in Water (Phase II), to carry out more comprehensive research in some specific areas of corrosion of aluminium clad spent nuclear fuel in water. In addition to this CRP, one of the activities under IAEA's Technical Cooperation Regional Project for Latin America Management of Spent Fuel from Research Reactors (2001-2006) was corrosion monitoring and surveillance of research

  1. Measurement of delayed neutron-emitting fission products in nuclear reactor coolant water during reactor operation

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The method covers the detection and measurement of delayed neutron-emitting fission products contained in nuclear reactor coolant water while the reactor is operating. The method is limited to the measurement of the delayed neutron-emitting bromine isotope of mass 87 and the delayed neutron-emitting iodine isotope of mass 137. The other delayed neutron-emitting fission products cannot be accurately distinguished from nitrogen 17, which is formed under some reactor conditions by neutron irradiation of the coolant water molecules. The method includes a description of significance, measurement variables, interferences, apparatus, sampling, calibration, standardization, sample measurement procedures, system efficiency determination, calculations, and precision

  2. Ductile fracture behaviour of primary heat transport piping material ...

    Indian Academy of Sciences (India)

    R. Narasimhan (Krishtel eMaging) 1461 1996 Oct 15 13:05:22

    Abstract. Design of primary heat transport (PHT) piping of pressurised heavy water reactors (PHWR) has to ensure implementation of leak-before-break con- cepts. In order to be able to do so, the ductile fracture characteristics of PHT piping material have to be quantified. In this paper, the fracture resistance of SA333, Grade.

  3. A water inner circulation device for a reactor vessel

    International Nuclear Information System (INIS)

    Eriksson, O.

    1976-01-01

    A water inner circulation device for a reactor vessel comprising a pump mounted in the reactor vessel and driven by a water-cooled electric motor mounted in a housing outside the reactor vessel, the shaft of the pump passing through the reactor-vessel bottom and being coupled to the motor shaft in a member mechanically connected to the bottom of the reactor vessel in the vicinity of the motor housing, the pump shaft being surrounded by a resilient sealing ring, the reactor vessel communicating with the cooling channels of the pump, when the latter is operating, via a slot surrounding the pump hollow cylindrical shaft, characterized in that the slot inner end is used for/forming a circular space surrounding the pump shaft and surrounded by the motorhousing, in which is coaxially mounted a separating cylindral wall, the upper edge of which is tightly applied against the inner wall of the motor-housing to which it is fastened vertically, the inner surface of said wall being turned towards the outer surface of a circular packing-box, the outer surface of said separating wall constituting a separating radical inner surface for a circular chamber through which flow the motor cooling water. (author)

  4. Some aspects of primary and secondary water chemistry in CANDU reactors

    International Nuclear Information System (INIS)

    LeSurf, J.E.

    1978-09-01

    A brief review of the water chemistry in various circuits of CANDU reactors is given. Then, five particular aspects of recent work are highlighted: (i) Radiation Field Growth: in-reactor and out-reactor studies have related water chemistry to corrosion product deposition on fuel sheaths and subsequent contamination of out-core surfaces. (ii) Metal Oxide Solubility: novel techniques are being used to measure the solubilities of metal oxides at primary circuit conditions. (iii) Decontamination: the use of heavy water as coolant in CANDU reactors led to the development of a unique decontamination strategy and technique, called CAN-DECON, which has attracted the attention of operators of light-water reactors. (iv) Steam Generator Corrosion: mathematical modelling of the water chemistry in the bulk and crevice regions of nuclear steam generators, supported by chemical experiments, has shown why sea water ingress from leaking condensers can be damaging, and has provided a rapid way to evaluate alternative boiler water chemistries. (v) Automatic Control of Feedwater Chemistry: on-line automatic chemical analysis and computer control of feedwater chemistry provides All Volatile Treatment for normal operation with pure feedwater, and carefully controlled sodium phosphate addition when there is detectable sea-water ingress from leaking condensers. (author)

  5. WRAP: a water reactor analysis package

    International Nuclear Information System (INIS)

    Anderson, M.M.

    1977-06-01

    The modular computational system known as the Water Reactor Analysis Package (WRAP) has been developed at the Savannah River Laboratory. WRAP is essentially a reprogrammed version of the RELAP4 computer code with an extensively restructured input format, a dynamic dimensioning capability and additional computational capabilities such as an automatic steady-state option for pressurized water reactors and an automatic restart capability with provision for renodalization. The report describes the capabilities of WRAP at its current stage of development. The addition of new capabilities (e.g., a BWR steady-state capability), the inclusion of improved models (e.g., models in RELAP4/M0D8) and the development of improved numerical techniques to reduce execution time are being planned at this time

  6. A dual pressurized water reactor producing 2000 MWe

    International Nuclear Information System (INIS)

    Kang, K. M.; Suh, K. Y.

    2010-01-01

    The Dual Unit Optimizer 2000 MWe (DUO2000) is proposed as a new design concept for large nuclear power plant. DUO is being designed to meet economic and safety challenges facing the 21. century green and sustainable energy industry. DUO2000 has two nuclear steam supply systems (NSSSs) of the Unit Nuclear Optimizer (UNO) pressurized water reactor (PWR) in a single containment so as to double the capacity of the plant. UNO is anchored to the Optimized Power Reactor 1000 MWe (OPR1000). The concept of DUO can be extended to any number of PWRs or pressurized heavy water reactors (PHWRs), or even boiling water reactor (BWRs). Once proven in water reactors, the technology may even be expanded to gas cooled, liquid metal cooled, and molten salt cooled reactors. In particular, since it is required that the Small and Medium sized Reactors (SMRs) be built as units, the concept of DUO2000 will apply to SMRs as well. With its in-vessel retention external reactor vessel cooling (IVR-ERVC) as severe accident management strategy, DUO can not only put the single most querulous PWR safety issue to end, but also pave ways to most promising large power capacity dispensing with huge redesigning cost for Generation III+ nuclear systems. Also, the strengths of DUO2000 include reducing the cost of construction by decreasing the number of containment buildings from two to one, minimizing the cost of NSSS and control systems by sharing between the dual units, and lessening the maintenance cost by uniting the NSSS. Two prototypes are presented for the DUO2000, and their respective advantages and drawbacks are considered. The strengths include, but are not necessarily limited to, reducing the cost of construction by decreasing the number of containment buildings from two to one, minimizing the cost of NSSS and control systems by sharing between the dual units, and lessening the maintenance cost by uniting the NSSS, just to name the few. The Coolant Unit Branching Apparatus (CUBA) is proposed

  7. Emergency cooling system with hot-water jet pumps for nuclear reactors

    International Nuclear Information System (INIS)

    Reinsch, A.O.W.

    1977-01-01

    The ECCS for a PWR or BWR uses hot-water jet pumps to remove the thermal energy generated in the reactor vessel and stored in the water. The hot water expands in the nozzle part (Laval nozzle) of the jet pump and sucks in coolant (borated water) coming from a storage tank containing subcooled water. This water is mixing with the hot water/steam mixture from the Laval nozzle. The steam is condensed. The kinetic energy of the water is converted into a pressure increase which is sufficient to feed the water into the reactor vessel. The emergency cooling may further be helped by a jet condenser also operating according to the principle of a jet pump and condensing the steam generated in the reactor vessel. (DG) [de

  8. Conceptual design of a large heavy water reactor for US siting

    International Nuclear Information System (INIS)

    Shapiro, N.L.; Jesick, J.F.

    1979-09-01

    Information is presented concerning fuel management and safety and licensing assessment of the pressurized heavy water reactor; and commercial introduction of the pressurized heavy water reactor in the United States

  9. Mechanical design of a light water breeder reactor

    International Nuclear Information System (INIS)

    Fauth, W.L. Jr.; Jones, D.S.; Kolsun, G.J.; Erbes, J.G.; Brennan, J.J.; Weissburg, J.A.; Sharbaugh, J.E.

    1976-01-01

    In a light water reactor system using the thorium-232--uranium-233 fuel system in a seed-blanket modular core configuration having the modules arranged in a symmetrical array surrounded by a reflector blanket region, the seed regions are disposed for a longitudinal movement between the fixed or stationary blanket region which surrounds each seed region. Control of the reactor is obtained by moving the inner seed region thus changing the geometry of the reactor, and thereby changing the leakage of neutrons from the relatively small seed region into the blanket region. The mechanical design of the Light Water Breeder Reactor (LWBR) core includes means for axially positioning of movable fuel assemblies to achieve the neutron economy required of a breeder reactor, a structure necessary to adequately support the fuel modules without imposing penalties on the breeding capability, a structure necessary to support fuel rods in a closely packed array and a structure necessary to direct and control the flow of coolant to regions in the core in accordance with the heat transfer requirements. 4 claims, 24 drawing figures

  10. Advanced water-cooled reactor technologies. Rationale, state of progress and outlook

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Eighty per cent of the world's power reactors are water cooled and moderated. Many improvements in their design and operation have been implemented since the first such reactor started commercial operation in 1957. This report addresses the safety, environmental and economic rationales for further improvements, as well as their relevance to currently operating water reactors

  11. Instrumentation and control strategies for an integral pressurized water reactor

    Directory of Open Access Journals (Sweden)

    Belle R. Upadhyaya

    2015-03-01

    Full Text Available Several vendors have recently been actively pursuing the development of integral pressurized water reactors (iPWRs that range in power levels from small to large reactors. Integral reactors have the features of minimum vessel penetrations, passive heat removal after reactor shutdown, and modular construction that allow fast plant integration and a secure fuel cycle. The features of an integral reactor limit the options for placing control and safety system instruments. The development of instrumentation and control (I&C strategies for a large 1,000 MWe iPWR is described. Reactor system modeling—which includes reactor core dynamics, primary heat exchanger, and the steam flashing drum—is an important part of I&C development and validation, and thereby consolidates the overall implementation for a large iPWR. The results of simulation models, control development, and instrumentation features illustrate the systematic approach that is applicable to integral light water reactors.

  12. The thorium fuel cycle in water-moderated reactor systems

    International Nuclear Information System (INIS)

    Critoph, E.

    1977-05-01

    Thorium and uranium cycles are compared with regard to reactor characteristics and technology, fuel-cycle technology, economic parameters, fuel-cycle costs, and system characteristics. In heavy-water reactors (HWRs) thorium cycles having uranium requirements at equilibrium ranging from zero to a quarter of those for the natural-uranium once-through cycle appear feasible. An 'inventory' of uranium of between 1 and 2 Mg/MW(e) is required for the transition to equilibrium. The cycles with the lowest uranium requirements compete with the others only at high uranium prices. Using thorium in light-water reactors, uranium requirements can be reduced by a factor of between two and three from the once-through uranium cycle. The light-water breeder reactor, promising zero uranium requirements at equilibrium, is being developed. Larger uranium inventories are required than for the HWRs. The lead time, from a decision to use thorium to significant impact on uranium utilization (compared to uranium cycle, recycling plutonium) is some two decades

  13. Application of expert system to evaluating reactor water cleanup system performance

    International Nuclear Information System (INIS)

    Maeda, Katsuji; Nakamura, Masahiro; Nagasawa, Katsumi; Fushiki, Sumiyuki.

    1991-01-01

    Expert systems employing artificial intelligence (AI) have been developed for finding and elucidating causes of anomalies and malfunctions, presenting pertinent recommendation for countermeasures and for making precautionary diagnosis. On the other hand, further improvements in reliabilities for chemical control are required to promote BWR plant reliability and advancement. Especially, it is necessary to maintain the reactor water purity in high quality to minimize stress corrosion cracking (SCC) in primary cooling system, fuel performance degradation and radiation buildup. The reactor water quality is controlled by the reactor water cleanup (RWCU) system. So, it is very important to maintain the RWCU performance, in order to keep good reactor water quality. This paper describes an expert system used for evaluating RWCU system performance in BWR plants. (author)

  14. Water hammer characteristics of integral pressurized water reactor primary loop

    International Nuclear Information System (INIS)

    Zuo, Qiaolin; Qiu, Suizheng; Lu, Wei; Tian, Wenxi; Su, Guanghui; Xiao, Zejun

    2013-01-01

    Highlights: • Water hammer models developed for IPWR primary loop using MOC. • Good agreement between the developed code and the experiment. • The good agreement between WAHAP and Flowmaster can validate the equations in WAHAP. • The primary loop of IPWR suffers from slight water hammer impact. -- Abstract: The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions

  15. Water hammer characteristics of integral pressurized water reactor primary loop

    Energy Technology Data Exchange (ETDEWEB)

    Zuo, Qiaolin [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Qiu, Suizheng, E-mail: szqiu@mail.xjtu.edu.cn [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Lu, Wei; Tian, Wenxi; Su, Guanghui [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Xiao, Zejun [Nuclear Power Institute of China, Chengdu, Sichuan 610041 (China)

    2013-08-15

    Highlights: • Water hammer models developed for IPWR primary loop using MOC. • Good agreement between the developed code and the experiment. • The good agreement between WAHAP and Flowmaster can validate the equations in WAHAP. • The primary loop of IPWR suffers from slight water hammer impact. -- Abstract: The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions.

  16. Steam explosions in light water reactors

    International Nuclear Information System (INIS)

    1981-01-01

    The report deals with a postulated accident caused by molten fuel falling into the lower plenum of the containment of a reactor. The analysis which is presented in the report shows that the thermal energy released in the resulting steam explosion is not enough to destroy the pressure vessel or the containment. The report was prepared for the Swedish Governmental Committee on steam explosion in light water reactors. It includes statements issued by internationally well-known specialists. (G.B.)

  17. RETRAN sensitivity studies of light water reactor transients. Final report

    International Nuclear Information System (INIS)

    Burrell, N.S.; Gose, G.C.; Harrison, J.F.; Sawtelle, G.R.

    1977-06-01

    This report presents the results of sensitivity studies performed using the RETRAN/RELAP4 transient analysis code to identify critical parameters and models which influence light water reactor transient predictions. Various plant transients for both boiling water reactors and pressurized water reactors are examined. These studies represent the first detailed evaluation of the RETRAN/RELAP4 transient code capability in predicting a variety of plant transient responses. The wide range of transients analyzed in conjunction with the parameter and modeling studies performed identify several sensitive areas as well as areas requiring future study and model development

  18. Computer simulation of the NASA water vapor electrolysis reactor

    Science.gov (United States)

    Bloom, A. M.

    1974-01-01

    The water vapor electrolysis (WVE) reactor is a spacecraft waste reclamation system for extended-mission manned spacecraft. The WVE reactor's raw material is water, its product oxygen. A computer simulation of the WVE operational processes provided the data required for an optimal design of the WVE unit. The simulation process was implemented with the aid of a FORTRAN IV routine.

  19. Summary of the 3rd workshop on the reduced-moderation water reactor

    International Nuclear Information System (INIS)

    Ishikawa, Nobuyuki; Nakatsuka, Tohru; Iwamura, Takamichi

    2000-06-01

    The research activities of a Reduced-Moderation Water Reactor (RMWR) are being performed for a development of the next generation water-cooled reactor. A workshop on the RMWR was held on March 3rd 2000 aiming to exchange information between JAERI and other organizations such as universities, laboratories, utilities and vendors. This report summarizes the contents of lectures and discussions on the workshop. The 1st workshop was held on March 1998 focusing on the review of the research activities and future research plan. The succeeding 2nd workshop was held on March 1999 focusing on the topics of the plutonium utilization in water-cooled reactors. The 3rd workshop was held on March 3rd 2000, which was attended by 77 participants. The workshop began with a lecture titled 'Recent Situation Related to Reduced-Moderation Water Reactor (RMWR)', followed by 'Program on MOX Fuel Utilization in Light Water Reactors' which is the mainstream scenario of plutonium utilization by utilities, and 'Feasibility Studies on Commercialized Fast Breeder Reactor Cycle System' mainly conducted by Japan Nuclear Cycle Development Institute (JNC). Also, following lectures were given as the recent research activities in JAERI: 'Progress in Design Study on Reduced-Moderation Water Reactors', 'Long-Term Scenarios of Power Reactors and Fuel Cycle Development and the Role of Reduced Moderation Water Reactors', 'Experimental and Analytical Study on Thermal Hydraulics' and Reactor Physics Experiment Plan using TCA'. At the end of the workshop, a general discussion was performed about the research and development of the RMWR. This report includes the original papers presented at the workshop and summaries of the questions and answers for each lecture and general discussion, as well as presentation viewgraphs, program and participant list as appendixes. The 7 of the presented papers are indexed individually. (J.P.N.)

  20. Summary of the 3rd workshop on the reduced-moderation water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ishikawa, Nobuyuki; Nakatsuka, Tohru; Iwamura, Takamichi [eds.

    2000-06-01

    The research activities of a Reduced-Moderation Water Reactor (RMWR) are being performed for a development of the next generation water-cooled reactor. A workshop on the RMWR was held on March 3rd 2000 aiming to exchange information between JAERI and other organizations such as universities, laboratories, utilities and vendors. This report summarizes the contents of lectures and discussions on the workshop. The 1st workshop was held on March 1998 focusing on the review of the research activities and future research plan. The succeeding 2nd workshop was held on March 1999 focusing on the topics of the plutonium utilization in water-cooled reactors. The 3rd workshop was held on March 3rd 2000, which was attended by 77 participants. The workshop began with a lecture titled 'Recent Situation Related to Reduced-Moderation Water Reactor (RMWR)', followed by 'Program on MOX Fuel Utilization in Light Water Reactors' which is the mainstream scenario of plutonium utilization by utilities, and 'Feasibility Studies on Commercialized Fast Breeder Reactor Cycle System' mainly conducted by Japan Nuclear Cycle Development Institute (JNC). Also, following lectures were given as the recent research activities in JAERI: 'Progress in Design Study on Reduced-Moderation Water Reactors', 'Long-Term Scenarios of Power Reactors and Fuel Cycle Development and the Role of Reduced Moderation Water Reactors', 'Experimental and Analytical Study on Thermal Hydraulics' and Reactor Physics Experiment Plan using TCA'. At the end of the workshop, a general discussion was performed about the research and development of the RMWR. This report includes the original papers presented at the workshop and summaries of the questions and answers for each lecture and general discussion, as well as presentation viewgraphs, program and participant list as appendixes. The 7 of the presented papers are indexed individually. (J.P.N.)

  1. Method of decommissioning nuclear reactor building by utilizing sea water buyoancy

    International Nuclear Information System (INIS)

    Iwashima, Sumio; Ogoshi, Shigeru; Kobari, Shin-ichi.

    1989-01-01

    Upon dismantling nuclear reactor buildings, peripheral yards are excavated and channels leading to sea shore are formed. Since the outer walls of the reactor buildings are made of iron-reinforced concretes, the opening poritons are grouted with concretes to attain a tightly such closed structure that radioactive wastes, etc. in the inside are not flown out upon reactor discommisioning. Peripheral buildings at relatively low level of radiation contaminations are dismantled and withdrawn. The fundations of the nuclear reactor buildings were dug out and jacked to separate base rocks and the reactor buildings. Then, sea water is introduced into the water channels to entirely float up the buildings. A water gate is disposed in the water channel on the side of sea shore to control the level of sea water. The buildings are moved and guided to the sea shore and towed to a site optimum as a permanent storage area and then burried in that place. The operation period for the discommissioning work can greatly be shortened and the radiation dose and the amount of the wastes can be reduced. (T.M.)

  2. Overview of activities for the reduction of dose rates in Swiss boiling water reactors

    International Nuclear Information System (INIS)

    Alder, H.P.; Schenker, E.

    1993-01-01

    Since March 1990, zinc has been added to the reactor water of the boiling water reactor (BWR) Leibstadt (KKL) and, since January 1991, iron has been added to the BWR Muehleberg (KKM). These changes in reactor water chemistry were accompanied by a comprehensive R+D programme. This paper covers three selected topics: a) the statistical analysis of KKL reactor water data before and after zinc addition; b) the analysis of the KKL reactor water during the 1991 annual shutdown; c) laboratory autoclave tests to clarify the role of water additives on the cobalt deposition on austenitic steel surfaces. (author) 2 figs., 4 tabs

  3. Uranium utilization of light water cooled reactors and fast breeders

    International Nuclear Information System (INIS)

    Stojadinovic, Timm

    1991-08-01

    The better uranium utilization of fast breeder reactors as compared with water cooled reactors is one argument in favour of the breeder introduction. This report tries to quantify this difference. It gives a generally valid formalism for the uranium utilization as a function of the fuel burnup, the conversion rate, fuel cycle losses and the fuel enrichment. On the basis of realistic assumptions, the ratio between the utilizations of breeder reactors to that of light water cooled reactors (LWR) amounts to 180 for the open LWR cycle and 100 in case of plutonium recycling in LWRs

  4. The experimental program of neutronphysics for advanced water reactors

    International Nuclear Information System (INIS)

    Martin-Deider, L.; Cathalu, S.; Santamarina, A.; Gomit, M.

    1985-11-01

    The C.E.A. and E.D.F. has jointly undertaken a program of experimental studies on under-moderated water lattices, with mixed oxide fuel UO 2 -PuO 2 . Undermoderated lattices offer high conversion ratios. This type of lattice could limit in the future the natural uranium consumption of pressurized water reactors. This experimental program is aimed at qualifying neutron transport calculations in a large range of moderating ratio (between 0.5 and 1.5). It includes three experiments: ERASME, a critical experiment of large size in the EOLE reactor at Cadarache; ICARE, an irradiation experiment in the MELUSINE reactor at Grenoble; and an experiment to measure the reactivity effects by oscillations in the MINERVE reactor at Cadarache [fr

  5. On the slimeless water operation in the RBMK type reactors

    International Nuclear Information System (INIS)

    Margulova, T.Kh.; Mamet, V.A.; Nikitina, I.S.; Karakhanyan, L.N.

    1988-01-01

    Water chemistry conditions of the operating RBMK-1000 and RBMK-1500 units are analysed. Inevitability of iron oxide deposits in RBMK-1000 and particularly in RBMK-1500 reactors is demonstrated. Organization of a new slimeless correcting water chemistry for RBMK-1000 and RBMK-1500 reactors is recommended

  6. Experimental study of poison moderator interface movement for shut down system #2(SDS#2) of 540 MWe PHWR

    International Nuclear Information System (INIS)

    Sapra, M.K.; Kundu, S.; Chawan, D.B.; Ananthan, P.; Sharma, B.S.V.G.; Mohan, L.R.

    2005-03-01

    The poison solution and the moderator in Secondary Shutdown System (SDS-2) of 500 MWe PHWR, are separated by their own liquid in liquid interface, termed as poison moderator interface (PMI). During normal operation of the reactor, the interface moves towards the calandria, mainly because of molecular diffusion from poison to moderator. Other reasons for movement are mixing of poison and moderator due to physical disturbances in the moderator level and to some extent due to temperature difference between the two liquids. The electrical conductivity of these liquids was found to be the most reliable parameter indicating interface movement. For this purpose, two on-line high-pressure conductivity probes have been installed on moderator side for each one of the six poison tanks. During normal operation of reactor, the interface moves slowly towards the calandria over a period of time and gives rise to increase in conductivity. To study the interface pattern and factors affecting the same, a full-scale experimental setup was developed and series of experiments carried out. The experimental results showed that the interface is quite stable and annunciation can be placed around 100 micro siemens/cm before back flushing is initiated. One dimensional diffusion analysis of the obtained experimental data showed that the derived model for PMI setup with diffusion parameter of 900 cm 2 /hr is able to predict the interface movement quite satisfactorily. This report gives an insight into the experiments carried out for estimation of the effective diffusion parameter for the poison moderator interface, model formulation and its prognostic behavior. (author)

  7. Status of research and development on reduced-moderation water reactors

    International Nuclear Information System (INIS)

    Iwamura, Takamichi

    2002-01-01

    To improve uranium utilization, a design study of the Reduced-Moderation Water Reactor (RMWR) has been carried out intensively since 1998 at the Japan Atomic Energy Research Institute (JAERI). In this reactor, the nuclear fission reaction is designed to be realized mainly by high energy neutrons. To achieve this, the volume of water used to cool the fuel rods is decreased by reducing the gap width between the fuel rods. Conversion ratio greater than 1.0 is expected whether the core i-s cooled by boiling water or pressurized water and whether the core size is small or large. Status of the RMWR design is reviewed and planning of R and D for future deployment of this reactor after 20-20 is presented. To improve economics of this reactor, development of fuel cans for high burnup and low-cost reprocessing technology of mixed oxide spect fuels are highly needed. R and D has been conducted under the cooperation with utilities, industry, research organization and academia. (T. Tanaka)

  8. Status of research and development on reduced-moderation water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Iwamura, Takamichi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-12-01

    To improve uranium utilization, a design study of the Reduced-Moderation Water Reactor (RMWR) has been carried out intensively since 1998 at the Japan Atomic Energy Research Institute (JAERI). In this reactor, the nuclear fission reaction is designed to be realized mainly by high energy neutrons. To achieve this, the volume of water used to cool the fuel rods is decreased by reducing the gap width between the fuel rods. Conversion ratio greater than 1.0 is expected whether the core i-s cooled by boiling water or pressurized water and whether the core size is small or large. Status of the RMWR design is reviewed and planning of R and D for future deployment of this reactor after 20-20 is presented. To improve economics of this reactor, development of fuel cans for high burnup and low-cost reprocessing technology of mixed oxide spect fuels are highly needed. R and D has been conducted under the cooperation with utilities, industry, research organization and academia. (T. Tanaka)

  9. Approaching six sigma quality in nuclear fuel fabrication - an Indian perspective

    International Nuclear Information System (INIS)

    Laxminarayana, B.; Kamalesh Kumar, B.; Saratchandran, N.; Ganguly, C.

    1999-01-01

    Nuclear Fuel complex (NFC), Hyderabad, manufactures fuel and structural components for both Boiling Water Reactors (BWR) and Pressurised Heavy water (PHWR). Customer and product quality has always been assigned top priority at NFC. At present, NFC is pursuing the goal of attaining six sigma quality levels, the paper brings out the details of various steps initiated and progress made towards the same, with a special reference to end closure welds. (author)

  10. Boiling water reactor life extension monitoring

    International Nuclear Information System (INIS)

    Stancavage, P.

    1991-01-01

    In 1991 the average age of GE-supplied Boiling Water Reactors (BWRs) reached 15 years. The distribution of BWR ages range from three years to 31 years. Several of these plants have active life extension programmes, the most notable of which is the Monticello plant in Minnesota which is the leading BWR plant for license renewal in the United States. The reactor pressure vessel and its internals form the heart of the boiling water reactor (BWR) power plant. Monitoring the condition of the vessel as it operates provides a continuous report on the structural integrity of the vessel and internals. Monitors for fatigue, stress corrosion and neutron effects can confirm safety margins and predict residual life. Every BWR already incorporates facilities to track the key aging mechanisms of fatigue, stress corrosion and neutron embrittlement. Fatigue is measured by counting the cycles experienced by the pressure vessel. Stress corrosion is gauged by periodic measurements of primary water conductivity and neutron embrittlement is tracked by testing surveillance samples. The drawbacks of these historical procedures are that they are time consuming, they lag the current operation, and they give no overall picture of structural integrity. GE has developed an integrated vessel fitness monitoring system to fill the gaps in the historical, piecemetal monitoring of the BWR vessel and internals and to support plant life extension. (author)

  11. Steam--water mixing in nuclear reactor safety loss-of-coolant experiments

    International Nuclear Information System (INIS)

    Naff, S.A.; Schwarz, W.F.

    1978-01-01

    Computer models used to predict the response of reactors to hypothesized accidents necessarily incorporate approximating assumptions. To verify the models by comparing predicted and measured responses in test facilities, these assumptions must be confirmed to be realistic. Recent experiments in facilities capable of repeatedly duplicating the transient behavior of a pressurized water reactor undergoing a pipe rupture show that the assumption of complete water-steam mixing during the transient results in the predicted decompression being faster than that observed. Water reactor safety studies currently in progress include programs aimed at the verification of computer models or ''codes'' used to predict reactor system responses to various hypothesized accidents. The approach is to compare code predictions of transients with the actual test transients in experimental facilities. The purpose of this paper is to explain an important instance in which predictions and data are not in complete agreement and to indicate the significance to water reactor safety studies

  12. Reactor protection systems of 500 MWe PHWRs

    Energy Technology Data Exchange (ETDEWEB)

    Mallik, G; Kelkar, M G; Apte, Ravindra [C and I Group, Nuclear Power Corporation, Mumbai (India)

    1997-03-01

    The 500 MWe PHWR has two totally independent, diverse, fast acting shutdown system called Shutdown System 1 (SDS 1) and Shutdown System 2 (SDS 2). The trip generation circuitry of SDS 1 and SDS 2 are known as Reactor Protection System 1 (RPS 1) and Reactor Protection System 2 (RPS 2) respectively. Some of the features specific to 500 MWe reactors are Core Over Power Protection System (COPPS) based upon in core Self Powered Neutron Detector (SPND) signals, use of local two out of three coincidence logic and adoption of overlap testing for RPS 2, use of Fine Impulse Testing (FIT) in RPS 2, testing of the final control elements namely electro-magnetic clutch of individual Shutoff Rods (SRs) of SDS 1 and all the fast acting valves of SDS 2, etc. The two shutdown systems have totally separate sets of sensors and associated signal processing circuitry as well as physical arrangements. A separate computerised test and monitoring unit is used for each of the two shutdown systems. Use of Programmable Digital Comparator (PDC) unit exclusively for reactor protection systems, has been adopted. The capability of PDC unit is enhanced and communication links are provided for its integration in over all system. The paper describes the design features of reactor protection systems. (author). 3 refs., 7 figs., 3 tabs.

  13. Reactor simulator development. Workshop material

    International Nuclear Information System (INIS)

    2001-01-01

    The International Atomic Energy Agency (IAEA) has established a programme in nuclear reactor simulation computer programs to assist its Member States in education and training. The objective is to provide, for a variety of advanced reactor types, insight and practice in reactor operational characteristics and their response to perturbations and accident situations. To achieve this, the IAEA arranges for the supply or development of simulation programs and training material, sponsors training courses and workshops, and distributes documentation and computer programs. This publication consists of course material for workshops on development of such reactor simulators. Participants in the workshops are provided with instruction and practice in the development of reactor simulation computer codes using a model development system that assembles integrated codes from a selection of pre-programmed and tested sub-components. This provides insight and understanding into the construction and assumptions of the codes that model the design and operational characteristics of various power reactor systems. The main objective is to demonstrate simple nuclear reactor dynamics with hands-on simulation experience. Using one of the modular development systems, CASSIM tm , a simple point kinetic reactor model is developed, followed by a model that simulates the Xenon/Iodine concentration on changes in reactor power. Lastly, an absorber and adjuster control rod, and a liquid zone model are developed to control reactivity. The built model is used to demonstrate reactor behavior in sub-critical, critical and supercritical states, and to observe the impact of malfunctions of various reactivity control mechanisms on reactor dynamics. Using a PHWR simulator, participants practice typical procedures for a reactor startup and approach to criticality. This workshop material consists of an introduction to systems used for developing reactor simulators, an overview of the dynamic simulation

  14. Darlington NGD valve packing program

    International Nuclear Information System (INIS)

    Spence, C.G.

    1995-01-01

    Darlington NGD is a four unit CANDU 1000 nuclear generation station, located on the shores of Lake Ontario, approximately 45 miles east of Toronto. The CANDU design is a Pressurized Heavy Water Reactor (PHWR), each unit at Darlington is designed to produce 940MWe. The commissioning phase of the station was completed in the spring of 1993. (author)

  15. The risks of nuclear energy technology. Safety concepts of light water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Raskob, Wolfgang; Landman, Claudia; Paesler-Sauer, Juergen [Karlsruher Institut fuer Technologie (KIT), Eggenstein-Leopoldshafen (Germany). Inst. fuer Kern- und Energietechnk (IKET); Kessler, Guenter; Veser, Anke; Schlueter, Franz-Hermann

    2014-11-01

    Analyses the risks of nuclear power stations. Discusses the security concept of reactors. Analyzes possible crash of air planes on a reactor containment. Presents measures against the spread of radioactivity after a severe accident. Written in engaging style for professionals and policy makers. The book analyses the risks of nuclear power stations. The security concept of reactors is explained. Measures against the spread of radioactivity after a severe accident, accidents of core melting and a possible crash of an air plane on a reactor containment are discussed. The book covers three scientific subjects of the safety concepts of Light Water Reactors: - A first part describes the basic safety design concepts of operating German Pressurized Water Reactors and Boiling Water Reactors including accident management measures introduced after the reactor accidents of Three Mile Island and Chernobyl. These safety concepts are also compared with the experiences of the Fukushima accidents. In addition, the safety design concepts of the future modern European Pressurized Water Reactor (EPR) and of the future modern Boiling Water Reactor SWR-1000 (KERENA) are presented. These are based on new safety research results of the past decades. - In a second, part the possible crash of military or heavy commercial air planes on a reactor containment is analyzed. It is shown that reactor containments can be designed to resist to such an airplane crash. - In a third part, an online decision system is presented. It allows to analyze the distribution of radioactivity in the atmosphere and to the environment after a severe reactor accident. It provides data for decisions to be taken by authorities for the minimization of radiobiological effects to the population. This book appeals to readers who have an interest in save living conditions and some understanding for physics or engineering.

  16. Aerosol behavior and light water reactor source terms

    International Nuclear Information System (INIS)

    Abbey, F.; Schikarski, W.O.

    1988-01-01

    The major developments in nuclear aerosol modeling following the accident to pressurized water reactor Unit 2 at Three Mile Island are briefly reviewed and the state of the art summarized. The importance and implications of these developments for severe accident source terms for light water reactors are then discussed in general terms. The treatment is not aimed at identifying specific source term values but is intended rather to illustrate trends, to assess the adequacy of the understanding of major aspects of aerosol behavior for source term prediction, and demonstrate in qualitative terms the effect of various aspects of reactor design. Areas where improved understanding of aerosol behavior might lead to further reductions in current source terms predictions are also considered

  17. Reliability of reactor plant water cleanup pumps

    International Nuclear Information System (INIS)

    Pearson, J.L.

    1979-01-01

    Carolina Power and Light Company's Brunswick 2 nuclear plant experienced a high reactor water cleanup pump-failure rate until inlet temperature and flow were reduced and mechanical modifications were implemented. Failures have been zero for about one year, and water cleanup efficiency has increased

  18. A review of fast reactor programme in India - April 1992

    Energy Technology Data Exchange (ETDEWEB)

    Paranjpe, S R [Indira Gandhi Centre for Atomic Research, Kalpakkam, Tamil Nadu (India)

    1992-07-01

    There is no change in the basic policy for development of nuclear energy in India. Fast Breeder Reactors are required to be available commercially to supply increasing quantities of nuclear energy when the first phase programme of deployment of Pressurised Heavy Water Reactors would be reaching the limit imposed by indigenously available natural uranium. Based on presently proven reserves of economically exploitable uranium one cannot expect to support more than 10 to 15 million kilowatt of installed capacity of PHWRs. The immediate goal of the Fast Reactor Programme therefore, remains completion by 2002-2003 of the first 500 MWe Prototype Fast Breeder Reactor which will become the first reactor in the series of reactors to be built there afterwards. This will enable addition of one 500 MWe reactor each year even if the first phase of programme of PHWR is limited to 6.0 million kilowatt. The capital cost of installed kilowatt for FBRs is expected to be comparable to the capital cost per kilowatt for PHWRS. It is expected to launch the construction of PFBR in the next 2 or 3 years as soon as the over all economic condition shows some improvement. In the meantime, manufacturing development of important NSS components like Steam Generators, Sodium Pumps, Main Vessel and Inner Vessel has been initiated. Detailed designs of Control Rod Drive Mechanism (Primary) has been completed and contacts with the manufacturers are being established to identify the industry which would be entrusted with the responsibility of manufacturing the Control Rod Drive Mechanisms. Manufacturing technology for making cladding tubes of D9 stainless steel has been developed and significant progress has been made towards the production of hexagonal wrapper (i.e. Hex-Cans). Inclined Fuel Transfer Machine for loading and unloading the fuel from the Main Vessel has been designed and manufacturing of the prototype machine has been initiated. It is hoped that these steps will enable timely completion

  19. Heavy water upgrading system in the Fugen heavy water reactor

    International Nuclear Information System (INIS)

    Matsushita, T.; Susaki, S.

    1980-01-01

    The heavy water upgrading system, which is installed in the Fugen heavy water reactor (HWR) was designed to reuse degraded heavy water generated from the deuteration-dedeuteration of resin in the ion exchange column of the moderator purification system. The electrolysis method has been applied in this system on the basis of the predicted generation rate and concentration of degraded heavy water. The structural feature of the electrolytic cell is that it consists of dual cylindrical electrodes, instead of a diaphragm as in the case of conventional water electrolysis. 2 refs

  20. NEPTUNE: a modular system for light-water reactor calculation

    International Nuclear Information System (INIS)

    Bouchard, J.; Kanevoky, A.; Reuss, P.

    1975-01-01

    A complete modular system of light water reactor calculations has been designed. It includes basic nuclear data processing, the APOLLO phase: transport calculations for cells, multicells, fuel assemblies or reactors, the NEPTUNE phase: reactor calculations. A fuel management module, devoted to the automatic determination of the best shuffling strategy is included in NEPTUNE [fr

  1. Feasibility study on the thorium fueled boiling water breeder reactor

    International Nuclear Information System (INIS)

    PetrusTakaki, N.

    2012-01-01

    The feasibility of (Th,U)O 2 fueled, boiling water breeder reactor based on conventional BWR technology has been studied. In order to determine the potential use of water cooled thorium reactor as a competitive breeder, this study evaluated criticality, breeding and void reactivity coefficient in response to changes made in MFR and fissile enrichments. The result of the study shows that while using light water as moderator, low moderator to fuel volume ratio (MFR=0.5), it was possible to breed fissile fuel in negative void reactivity condition. However the burnup value was lower than the value of the current LWR. On the other hand, heavy water cooled reactor shows relatively wider feasible breeding region, which lead into possibility of designing a core having better neutronic and economic performance than light water with negative void reactivity coefficient. (authors)

  2. Penn State advanced light water reactor concept

    International Nuclear Information System (INIS)

    Borkowski, J.A.; Smith, K.A.; Edwards, R.M.; Robinson, G.E.; Schultz, M.A.; Klevans, E.H.

    1987-01-01

    The accident at Three Mile Island heightened concerns over the safety of nuclear power. In response to these concerns, a research group at the Pennsylvania State University (Penn State) undertook the conceptual design of an advanced light water reactor (ALWR) under sponsorship of the US Dept. of Energy (DOE). The design builds on the literally hundreds of years worth of experience with light water reactor technology. The concept is a reconfigured pressurized water reactor (PWR) with the capability of being shut down to a safe condition simply by removing all ac power, both off-site and on-site. Using additional passively activated heat sinks and replacing the pressurizer with a pressurizing pump system, the concept essentially eliminates the concerns of core damage associated with a total station blackout. Evaluation of the Penn State ALWR concept has been conducted using the EPRI Modular Modeling System (MMS). Results show that a superior response to normal operating transients can be achieved in comparison to the response with a conventional PWR pressurizer. The DOE-sponsored Penn State ALWR concept has evolved into a significant reconfiguration of a PWR leading to enhanced safety characteristics. The reconfiguration has touched a number of areas in overall plant design including a shutdown turbine in the secondary system, additional passively activated heat sinks, a unique primary side pressurizing concept, a low pressure cleanup system, reactor building layout, and a low power density core design

  3. The European pressurized water reactor

    International Nuclear Information System (INIS)

    Leny, J.C.

    1993-01-01

    The present state of development of the European Pressurized Water Reactor (EPR) is outlined. During the so-called harmonization phase, the French and German utilities drew up their common requirements and evaluated the reactor concept developed until then with respect to these requirements. A main result of the harmonization phase was the issue, in September 1993, of the 'EPR Conceptual Safety Feature Review File' to be jointly assessed by the safety authorities in France and Germany. The safety objectives to be met by the EPR are specified in the second part of the paper, and some details of the primary and secondary side safety systems are given. (orig.) [de

  4. Good Practices for Water Quality Management in Research Reactors and Spent Fuel Storage Facilities

    International Nuclear Information System (INIS)

    2011-01-01

    Water is the most common fluid used to remove the heat produced in a research reactor (RR). It is also the most common media used to store spent fuel elements after being removed from the reactor core. Spent fuel is stored either in the at-reactor pool or in away-from-reactor wet facilities, where the fuel elements are maintained until submission to final disposal, or until the decay heat is low enough to allow migration to a dry storage facility. Maintaining high quality water is the most important factor in preventing degradation of aluminium clad fuel elements, and other structural components in water cooled research reactors. Excellent water quality in spent fuel wet storage facilities is essential to achieve optimum storage performance. Experience shows the remarkable success of many research reactors where the water chemistry has been well controlled. In these cases, aluminium clad fuel elements and aluminium pool liners show few, if any, signs of either localized or general corrosion, even after more than 30 years of exposure to research reactor water. In contrast, when water quality was allowed to degrade, the fuel clad and the structural parts of the reactor have been seriously corroded. The driving force to prepare this publication was the recognition that, even though a great deal of information on research reactor water quality is available in the open literature, no comprehensive report addressing the rationale of water quality management in research reactors has been published to date. This report is designed to provide a comprehensive catalogue of good practices for the management of water quality in research reactors. It also presents a brief description of the corrosion process that affects the components of a research reactor. Further, the report provides a basic understanding of water chemistry and its influence on the corrosion process; specifies requirements and operational limits for water purification systems of RRs; describes good practices

  5. Summary of the 4th workshop on the reduced-moderation water reactor

    International Nuclear Information System (INIS)

    Nakatsuka, Toru; Ishikawa, Nobuyuki; Iwamura, Takamichi

    2001-09-01

    The research on Reduced-Moderation Water Reactors (RMWRs) has been performed in JAERI for the development of future innovative reactors. The workshop on the RMWRs has been held every year since fiscal 1997 aimed at information exchange between JAERI and other organizations such as universities, laboratories, utilities and vendors. The 4th workshop was held on March 2, 2001 under the joint auspices of JAERI and North Kanto branch of Atomic Energy Society of Japan. The workshop began with three lectures on recent research activities in JAERI entitled 'Recent Situation of Research on Reduced-Moderation Water Reactor', 'Analysis on Electricity Generation Costs of Reduced Moderation Water Reactors' and 'Reprocessing Technology for Spent Mixed-Oxides Fuel from LWR'. Then five lectures followed: 'Micro Reactor Physics of MOX Fueled LWR' which shows the recent results of reactor physics, Fast Reactor Cooled by Supercritical Light Water' which is another type of reduced-moderation reactor, 'Phase 1 of Feasibility Studies on Commercialized Fast Breeder Reactor Cycle System' mainly conducted by Japan Nuclear Cycle Development Institute (JNC), 'Integral Type Small PWR with Stand-alone Safety' which is intended to suit for the future consumers' needs, and Utilization of Plutonium in Reduced-Moderation Water Reactors' which dictates benefits of plutonium utilization with RMWRs. This report includes the original papers presented at the workshop and summaries of the questions and answers for each lecture, as well as presentation handouts, program and participant list as appendixes. The 8 of the presented papers are indexed individually. (J.P.N.)

  6. Long-term scenarios of power reactors and fuel cycle development and the role of reduced moderation water reactors

    International Nuclear Information System (INIS)

    Sato, Osamu; Tatematsu, Kenji; Tanaka, Yoji

    2000-01-01

    Reduced moderation spectrum reactor is one of water cooled type reactors in future, which is based on the advanced technology of conventional nuclear power plants. The reduced moderation water reactor (RMWR) has various advantages, such as effective utilization of uranium resources, high conversion ratio, high burn-up, long-term cycle operation, and multiple recycle of plutonium. The RMWR is expected to be a substitute of fast breeder reactor (FBR) of which the development encounters with some technical and financial difficulties, and discontinues in many countries. The role of the RMWR on long-term scenarios of power reactor and fuel cycle development in Japan is investigated from the point of view of uranium resource needed. The consumption of natural uranium needed up to the year 2200 is calculated on various assumptions for the following three cases: (1) no breeder reactor; plutonium-thermal cycle in conventional light water reactor, (2) introduction of the FBR, and (3) introduction of the RMWR. The amounts of natural uranium consumption depends largely on the conversion ratio and plutonium quantity needed of a reactor type. The RMWR has a possibility as a substitute technology of the FBR with the improvement of conversion ratio and high burn-up. (Suetake, M.)

  7. Long-term scenarios of power reactors and fuel cycle development and the role of reduced moderation water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Osamu; Tatematsu, Kenji; Tanaka, Yoji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-06-01

    Reduced moderation spectrum reactor is one of water cooled type reactors in future, which is based on the advanced technology of conventional nuclear power plants. The reduced moderation water reactor (RMWR) has various advantages, such as effective utilization of uranium resources, high conversion ratio, high burn-up, long-term cycle operation, and multiple recycle of plutonium. The RMWR is expected to be a substitute of fast breeder reactor (FBR) of which the development encounters with some technical and financial difficulties, and discontinues in many countries. The role of the RMWR on long-term scenarios of power reactor and fuel cycle development in Japan is investigated from the point of view of uranium resource needed. The consumption of natural uranium needed up to the year 2200 is calculated on various assumptions for the following three cases: (1) no breeder reactor; plutonium-thermal cycle in conventional light water reactor, (2) introduction of the FBR, and (3) introduction of the RMWR. The amounts of natural uranium consumption depends largely on the conversion ratio and plutonium quantity needed of a reactor type. The RMWR has a possibility as a substitute technology of the FBR with the improvement of conversion ratio and high burn-up. (Suetake, M.)

  8. Development of supercritical water reactors in Russia and abroad

    International Nuclear Information System (INIS)

    Glebov, A.P.; Klushin, A.V.

    2014-01-01

    The results of Russian and foreign studies on the water-cooled high critical parameters reactors are analyzed. Developments on this subject are conducted in more than 15 countries. The advantages of WWER- SCP and characteristics of experimental reactor of WWER-SCP-30 are discussed. It is noted that priority task is to develop a reactor with thermal neutron spectrum with a subsequent transition to the reactor with a fast neutron spectrum [ru

  9. Development of an inconel self powered neutron detector for in-core reactor monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alex, M. [Electronics Division, BARC, Mumbai (India)]. E-mail: maryalex@barc.gov.in; Ghodgaonkar, M.D. [Electronics Division, BARC, Mumbai (India)

    2007-04-21

    The paper describes the development and testing of an Inconel600 (2 mm diameterx21 cm long) self-powered neutron detector for in-core neutron monitoring. The detector has 3.5 mm overall diameter and 22 cm length and is integrally coupled to a 12 m long mineral insulated cable. The performance of the detector was compared with cobalt and platinum detectors of similar dimensions. Gamma sensitivity measurements performed at the {sup 60}Co irradiation facility in 14 MR/h gamma field showed values of -4.4x10{sup -18} A/R/h/cm (-9.3x10{sup -24} A/{gamma}/cm{sup 2}-s/cm), -5.2x10{sup -18} A/R/h/cm (-1.133x10{sup -23} A/{gamma}/cm{sup 2}-s/cm) and 34x10{sup -18} A/R/h/cm (7.14x10{sup -23} A/{gamma}/cm{sup 2}-s/cm) for the Inconel, Co and Pt detectors, respectively. The detectors together with a miniature gamma ion chamber and fission chamber were tested in the in-core Apsara Swimming Pool type reactor. The ion chambers were used to estimate the neutron and gamma fields. With an effective neutron cross-section of 4b, the Inconel detector has a total sensitivity of 6x10{sup -23} A/nv/cm while the corresponding sensitivities for the platinum and cobalt detectors were 1.69x10{sup -22} and 2.64x10{sup -22} A/nv/cm. The linearity of the detector responses at power levels ranging from 100 to 200 kW was within {+-}5%. The response of the detectors to reactor scram showed that the prompt response of the Inconel detector was 0.95 while it was 0.7 and 0.95 for the platinum and cobalt self-powered detectors, respectively. The detector was also installed in the horizontal flux unit of 540 MW Pressurised Heavy Water Reactor (PHWR). The neutron flux at the detector location was calculated by Triveni code. The detector response was measured from 0.02% to 0.07% of full power and showed good correlation between power level and detector signals. Long-term tests and the dynamic response of the detector to shut down in PHWR are in progress.

  10. Development of next-generation light water reactor

    International Nuclear Information System (INIS)

    Ishibashi, Fumihiko; Yasuoka, Makoto

    2010-01-01

    The Next-Generation Light Water Reactor Development Program, a national project in Japan, was inaugurated in April 2008. The primary objective of this program is to meet the need for the replacement of existing nuclear power plants in Japan after 2030. With the aim of setting a global standard design, the reactor to be developed offers greatly improved safety, reliability, and economic efficiency through several innovative technologies, including a reactor core system with uranium enrichment of 5 to 10%, a seismic isolation system, long-life materials, advanced water chemistry, innovative construction techniques, optimized passive and active safety systems, innovative digital technologies, and so on. In the first three years, a plant design concept with these innovative features is to be established and the effectiveness of the program will be reevaluated. The major part of the program will be completed in 2015. Toshiba is actively engaged in both design studies and technology development as a founding member of this program. (author)

  11. Design and development of improved ballscrew and control circuit for reactivity mechanisms of 220 MWe PHWR operating stations

    International Nuclear Information System (INIS)

    Jain, A.K.; Rama Mohan, N.; Mathew, Jimmy; Mathur, M.K.; Roy, S.; Ingle, V.J.; Ghoshal, B.; Ashok Kumar, B.; Patil, D.C.; Dwivedi, K.P.; Bhambra, H.S.

    2006-01-01

    There has been persistent failure of Ballscrews used for Reactivity Mechanism in standardised 220 MWe PHWR units. The detailed review of failures indicated that on one hand the number of demands for operation of Absorber Rod and Regulating Rod had increased due to use of digital circuit in the drive control system as compared analog circuits used earlier. On the other hand, the existing design of ballscrew had some inherent weaknesses to withstand the loads generated during starting and stopping of the regulating rods. To solve these problems two-pronged approach was adopted. The control problem was traced to overshooting of the servomotor of Absorber Rod and Regulating Rod to the full speed at the time of starting and thereafter, settling to the required speed. This sudden overshooting produces a jerk in the drive mechanism. A modified circuit has been evolved to solve this problem. Also, Changing the dead band and gain of control circuits have reduced the number of rod movements. A 'new design' of Ballscrew assembly was finalised by NPCIL with a view to withstand the severe loads generated during starting and stopping of the regulating rods and to achieve enhanced service life under water-lubrication condition. Based on this design, prototype assemblies were successfully manufactured by two Indian manufacturers. The design was cleared for manufacturing of the bulk production of Ballscrew assemblies after evaluation of its performance during rigorous 'Acceptance Testing'. Two ballscrews of new design were installed in the KGS-1 reactor and are operating since July 2005. This paper covers operational feedback including ballscrew failures in various units, Design/Development of Modified Reactivity Mechanism Ballscrews and Control Circuit based on analysis of underlying causes of failures and feedback on performance of new design. (author)

  12. Thermophysical properties database of materials for light water reactors and heavy water reactors. Final report of a coordinated research project 1999-2005

    International Nuclear Information System (INIS)

    2006-06-01

    The IAEA Coordinated Research Project (CRP) on the Establishment of a Thermo-physical Properties Database for Light Water Reactors (LWRs) and Heavy Water Reactors (HWRs) started in 1999. It was included in the IAEA's Nuclear Power Programme following endorsement in 1997 by the IAEA's Technical Working Groups on Advanced Technologies for LWRs and HWRs (the TWG-LWR and the TWG-HWR). Furthermore, the TWG on Fuel Performance and Technology (TWG-FPT) also expressed its support. This CRP was conducted as a joint task within the IAEA's project on technology development for LWRs and HWRs in its nuclear power programme. Improving the technology for nuclear reactors through better computer codes and more accurate materials property data can contribute to improved economics of future plants by helping to remove the need for large design margins, which are currently used to account for limitations of data and methods. Accurate representations of thermo-physical properties under relevant temperature and neutron fluence conditions are necessary for evaluating reactor performance under normal operation and accident conditions. The objective of this CRP was to collect and systematize a thermo-physical properties database for light and heavy water reactor materials under normal operating, transient and accident conditions and to foster the exchange of non-proprietary information on thermo-physical properties of LWR and HWR materials. An internationally available, peer reviewed database of properties at normal and severe accident conditions has been established on the Internet. This report is intended to serve as a useful source of information on thermo-physical properties data for water cooled reactor analyses. The properties data have been initially stored in the THERSYST data system at the University of Stuttgart, Germany, which was subsequently developed into an internationally available Internet database named THERPRO at Hanyang University, Republic of Korea

  13. Light-water reactor research and development

    International Nuclear Information System (INIS)

    1985-05-01

    This report on the national program of research and development on light water reactors is the second of two reports requested in 1982 by W. Kenneth Davis, Deputy Secretary of the Department of Energy. A first report, published in September 1983, treated the needs for safety-related R and D. In this second report, the Energy Research Advisory Board finds that, although many light water reactors are providing reliable and economic electricity, it appears unlikely that U.S. utilities will order additional reactors until the currently unacceptable economic risk, created by the regulatory climate and uncertain demand, is reduced. Thus it is unlikely that the private sector alone will fund major LWR design improvements. However, nuclear power will continue on its current course of expansion overseas. DOE participation is vitally needed to support the national interest in LWR technology. The report outlines R and D needs for a program to improve the safety, reliability, and economics of the present generation of plants; to develop evolutionary improved designs to be ready when needed; and to explore innovative longer-term concepts for deployment after the year 2000. The respective roles of government and the private sector are discussed

  14. Gravity Scaling of a Power Reactor Water Shield

    International Nuclear Information System (INIS)

    Reid, Robert S.; Pearson, J. Boise

    2008-01-01

    Water based reactor shielding is being considered as an affordable option for potential use on initial lunar surface reactor power systems. Heat dissipation in the shield from nuclear sources must be rejected by an auxillary thermal hydraulic cooling system. The mechanism for transferring heat through the shield is natural convection between the core surface and an array of thermosyphon radiator elements. Natural convection in a 100 kWt lunar surface reactor shield design has been previously evaluated at lower power levels (Pearson, 2006). The current baseline assumes that 5.5 kW are dissipated in the water shield, the preponderance on the core surface, but with some volumetric heating in the naturally circulating water as well. This power is rejected by a radiator located above the shield with a surface temperature of 370 K. A similarity analysis on a water-based reactor shield is presented examining the effect of gravity on free convection between a radiation shield inner vessel and a radiation shield outer vessel boundaries. Two approaches established similarity: 1) direct scaling of Rayleigh number equates gravity-surface heat flux products, 2) temperature difference between the wall and thermal boundary layer held constant on Earth and the Moon. Nussult number for natural convection (laminar and turbulent) is assumed of form Nu = CRa n . These combined results estimate similarity conditions under Earth and Lunar gravities. The influence of reduced gravity on the performance of thermosyphon heat pipes is also examined

  15. The safety of pressurized water reactors

    International Nuclear Information System (INIS)

    Panossian, J.; Tanguy, P.

    1991-01-01

    In this paper we present a review of the status of the safety level of modern pressurized water reactors, that is to say those that meet the safety criteria accepted today by the international nuclear community. We will mainly rely on the operating experience and the Probabilistic Safety Assessments concerning French reactors. We will not back over the basic safety concepts of these reactors, which are well known. We begin with a brief review of some of the lessons learned from the two main accidents discussed in the present meeting. Three Mile Island and Chernobyl, without entering into details presented in previous papers. The presentation ends with a rather lengthy conclusion, aimed more at those not directly involved in the technical details of nuclear safety matters

  16. Improving the Sharing and Use of Operating Experience Among Pressurized Heavy Water Reactors

    International Nuclear Information System (INIS)

    Llewellyn, Michael D.

    1998-01-01

    Effective use of operating experience is an essential and fundamental aspect of the business of improving safety and reliability of nuclear power plant. Operating experience is considered of such importance, that it is embedded as a fundamental element in the WANO mission statement: 'To maximise the safety and reliability of operation of nuclear power plants by exchanging information and encouraging communication, comparison, and emulation amongst its members'. The exchange of information on plant operating experience and lessons learned from events is at the core of our WANO mission and is an essential element of effective operating experience use. Recognizing this, WANO - AC has joined together with Canadian PHWR operators in a cooperative effort to further strengthen the sharing of the event information, and to facilitate communication of PHWR operating experience worldwide. The content of the paper is: 1. Discussion; 2. Expectation; 3. Improving use of operating experience; 4. Internalizing operating experience; 5. Summary; 6. Attachments. The three attachments deal with: - WANO event reporting guidelines; - Root cause investigation guidelines; - Example prevent events briefing sheet. The paper is completed with the five slides used in the oral presentation

  17. Micropollutant removal from black water and grey water sludge in a UASB-GAC reactor.

    Science.gov (United States)

    Butkovskyi, A; Sevenou, L; Meulepas, R J W; Hernandez Leal, L; Zeeman, G; Rijnaarts, H H M

    2018-02-01

    The effect of granular activated carbon (GAC) addition on the removal of diclofenac, ibuprofen, metoprolol, galaxolide and triclosan in a up-flow anaerobic sludge blanket (UASB) reactor was studied. Prior to the reactor studies, batch experiments indicated that addition of activated carbon to UASB sludge can decrease micropollutant concentrations in both liquid phase and sludge. In continuous experiments, two UASB reactors were operated for 260 days at an HRT of 20 days, using a mixture of source separated black water and sludge from aerobic grey water treatment as influent. GAC (5.7 g per liter of reactor volume) was added to one of the reactors on day 138. No significant difference in COD removal and biogas production between reactors with and without GAC addition was observed. In the presence of GAC, fewer micropollutants were washed out with the effluent and a lower accumulation of micropollutants in sludge and particulate organic matter occurred, which is an advantage in micropollutant emission reduction from wastewater. However, the removal of micropollutants by adding GAC to a UASB reactor would require more activated carbon compared to effluent post-treatment. Additional research is needed to estimate the effect of bioregeneration on the lifetime of activated carbon in a UASB-GAC reactor.

  18. Role of water lubricated bearings in Candu reactors

    International Nuclear Information System (INIS)

    Kumar, Ashok N.

    1999-01-01

    During the twentieth century a great emphasis was placed in understanding and defining the operating regime of oil and grease lubricated components. Major advances have been made through elastohydrodynamic lubrication theory in the quantifying the design life of heavily loaded components such as rolling element bearings and gears. Detailed guidelines for the design of oil and grease lubricated components are widely available and are being applied to the successful design of these components. However similar guidelines for water lubricated components are either not available or not well documented. It is often forgotten that the water was used as a lubricant in several components as far back as 1884 B.C. During the twentieth century the water lubricated components continued to play a major role in some high technology industries such as in the power generation plants. In CANDU nuclear reactors water lubrication of several critical components always occupied a pride place and in most cases the only practical mode of lubrication of several critical components always occupied a pride place and in most cases the only practical mode of lubrication. This paper presents some examples of the major water lubricated components in a CANDU reactors. Major part of the paper is focused on presenting an example of successful operating history of water lubricated bearings used in the HT pumps are presented. Both types of bearings have been qualified by tests for operation under normal as well as under more severe postulated condition of loss-of-coolant-accident (LOCA). These bearings have been designed to operate for the 30 years in the existing CANDU 6 (600 MW) reactors. However for the next generation of CANDU 6 reactors which go into service in the year 2003, the HT pump bearing life has been extended to 40 years. (author)

  19. Spectral shift rod for the boiling water reactor

    International Nuclear Information System (INIS)

    Yokomizo, O.; Kashiwai, S.; Nishida, K.; Orii, A.; Yamashita, J.; Mochida, T.

    1993-01-01

    A Boiling Water Reactor core concept has been proposed using a new fuel component called spectral shift rod (SSR). The SSR is a new type of water rod in which a water level is formed during core operation. The water level can be controlled by the core recirculation flow rate. By using SSRs, the reactor can be operated with all control rods withdrawn through the operation cycle as well as that a much larger natural uranium saving is possible due to spectral shift operation than in current BWRs. The steady state and transient characteristics of the SSRs have been examined by experiments and analyses to certify the feasibility. In a reference design, a four times larger spectral shift width as for the current BWR has been obtained. (orig.)

  20. Measurement of fission gas release, internal pressure and cladding creep rate in the fuel pins of PHWR bundle of normal discharge burnup

    Energy Technology Data Exchange (ETDEWEB)

    Viswanathan, U.K. [Post Irradiation Examination Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India); Sah, D.N., E-mail: dnsah@barc.gov.i [Post Irradiation Examination Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India); Rath, B.N.; Anantharaman, S. [Post Irradiation Examination Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India)

    2009-08-01

    Fuel pins of a Pressurised Heavy Water Reactor (PHWR) fuel bundle discharged from Narora Atomic Power Station unit no. 1 after attaining a fuel burnup of 7528 MWd/tU have been subjected to two types of studies, namely (i) puncture test to estimate extent of fission gas release and internal pressure in the fuel pin and (ii) localized heating of the irradiated fuel pin to measure the creep rate of the cladding in temperature range 800 deg. C - 900 deg. C. The fission gas release in the fuel pins from the outer ring of the bundle was found to be about 8%. However, only marginal release was found in fuel pins from the middle ring and the central fuel pin. The internal gas pressure in the outer fuel pin was measured to be 0.55 +- 0.05 MPa at room temperature. In-cell isothermal heating of a small portion of the outer fuel pins was carried out at 800 deg. C, 850 deg. C and 900 deg. C for 10 min and the increase in diameter of the fuel pin was measured after heat treatment. Creep rates of the cladding obtained from the measurement of the diameter change of the cladding due to heating at 800 deg. C, 850 deg. C and 900 deg. C were found respectively to be 2.4 x 10{sup -5} s{sup -1}, 24.6 x 10{sup -5} s{sup -1} and 45.6 x 10{sup -5} s{sup -1}.

  1. Light-water reactor accident classification

    International Nuclear Information System (INIS)

    Washburn, B.W.

    1980-02-01

    The evolution of existing classifications and definitions of light-water reactor accidents is considered. Licensing practice and licensing trends are examined with respect to terms of art such as Class 8 and Class 9 accidents. Interim definitions, consistent with current licensing practice and the regulations, are proposed for these terms of art

  2. Safety considerations concerning light water reactors in Sweden

    International Nuclear Information System (INIS)

    Nilsson, T.

    1977-01-01

    In 1975 the Swedish Nuclear Power Inspectorate was commissioned by the Government to perform a Reactor Safety Study concerning commercial light water reactors. The study will contain an account of: - rules and regulations for reactor designs; - operation experience of the Swedish nuclear power plants with international comparisons; - the development of reactor designs during the last 10 years; - demands and conditions for inspection and inspection methods; - nuclear power plant operation organization; - training of operators; and - the results of research into nuclear safety. The study is scheduled for completion by July 1st, 1977, however, this paper gives a summary of the results of the Reactor Safety Study already available. The paper contains detailed statistics concerning safety related occurrences and reactor scrams in Sweden from July 1st, 1974 until the beginning of 1977

  3. Mathematical modelling of heat absorption capacity of containment spray system in a 700 MWe PHWR

    International Nuclear Information System (INIS)

    Kota, Sampath Bharadwaj; Ali, Seik Mansoor; Balasubramaniyan, V.

    2015-01-01

    This paper presents a mathematical model for estimating the heat removal by containment spray system in the post Loss of Coolant Accident (LOCA) environment. The procedure involves firstly, the calculation of heat removal rates by droplets of spray dispersed in the air-steam mixture by an appropriate direct contact condensation model accounting for the presence of non-condensable gas (air). Parametric influence of droplet size, ambient pressure and temperature on heat flux is brought out. It was found that the heat flux is inversely proportional to the ambient pressure and diameter. A spray module was subsequently developed and incorporated into an in-house containment thermal hydraulics code. The pressure and temperature transients in a 700 MWe PHWR containment building following a Large Break LOCA was obtained using this code. The efficacy of the spray in condensing the steam is shown by comparing the transients with and without the operation of spray system. Parametric studies are also conducted with respect to droplet size and flow rate of water droplet spray. The details of the investigation are presented and discussed in this paper. (author)

  4. Application of fuzzy logic control system for reactor feed-water control

    International Nuclear Information System (INIS)

    Iijima, T.; Nakajima, Y.

    1994-01-01

    The successful actual application of a fuzzy logic control system to the a nuclear Fugen nuclear power reactor is described. Fugen is a heavy-water moderated, light-water cooled reactor. The introduction of fuzzy logic control system has enabled operators to control the steam drum water level more effectively in comparison to a conventional proportional-integral (PI) control system

  5. A `big-mac` high converting water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ronen, Y; Dali, Y [Ben-Gurion Univ. of the Negev, Beersheba (Israel). Dept. of Nuclear Engineering

    1996-12-01

    Currently an effort is being made to get rid of plutonium. Therefore, at this time, a scientific study of a high converting reactor seems to be out of place. However , it is our opinion that the future of nuclear energy lies, among other things in the clever utilization of plutonium. It is also our opinion that one of the best ways to utilize plutonium is in high converting water reactors (authors).

  6. Nuclear reactor with makeup water assist from residual heat removal system

    International Nuclear Information System (INIS)

    Schulz, T.L.; Corletti, M.M.

    1994-01-01

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit by pumping water from an in-containment refueling water storage tank during staged depressurization of the coolant circuit, the final stage including passive emergency cooling by gravity feed from the refueling water storage tank to the coolant circuit and to flood the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and avoids the final stage of depressurization with its flooding of the containment when such action is not necessary, but does not prevent the final stage when it is necessary. A high pressure makeup water storage tank coupled to the reactor coolant circuit holds makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal system can also be coupled in a loop with the refueling water supply tanks for cooling the tank. (Author)

  7. Passive systems for light water reactors

    International Nuclear Information System (INIS)

    Adinolfi, R.; Noviello, L.

    1990-01-01

    The paper reviews the most original concepts that have been considered in Italy for the back-fitting of the nuclear power plants in order to reduce the probability and the importance of the release to the environment in case of a core melt. With reference either to BWR or PWR, passive concepts have been considered for back-fitting in the following areas: pump seals damage prevention and ECCS passive operation; reactor passive depressurization; molten reactor core passive cooling; metal containment passive water cooling through a water tank located at high level; containment isolation improvement through a sealing system; containment leaks control and limitation of environmental release. In addition some considerations will be made on the protection against external events introduced from the beginning on the PUN design either on building and equipment lay-out either on structure design. (author). 5 figs

  8. Pumps for German pressurized water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Dernedde, R.

    1984-01-01

    The article describes the development of a selection of pumps which are used in the primary coolant system and the high-pressure safety injection system and feed water system during the past 2 decades. The modifications were caused by the step-wise increasing power output of the plants from 300 MW up to 1300 MW. Additional important influences were given be the increased requirements for quality assurance and final-documentation. The good operating results of the delivered pumps proved that the reliability is independent of the volume of the software-package. The outlook expects that consolidation will be followed by additional steps for the order processing of components for the convoy pumps. KW: main coolant pump; primary system; boiler feed pump; reactor pump; secondary system; barrel insert pump; pressure water reactor; convoy pump; state of the art.

  9. Summary of the 4th workshop on the reduced-moderation water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Nakatsuka, Toru; Ishikawa, Nobuyuki; Iwamura, Takamichi (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-09-01

    The research on Reduced-Moderation Water Reactors (RMWRs) has been performed in JAERI for the development of future innovative reactors. The workshop on the RMWRs has been held every year since fiscal 1997 aimed at information exchange between JAERI and other organizations such as universities, laboratories, utilities and vendors. The 4th workshop was held on March 2, 2001 under the joint auspices of JAERI and North Kanto branch of Atomic Energy Society of Japan. The workshop began with three lectures on recent research activities in JAERI entitled 'Recent Situation of Research on Reduced-Moderation Water Reactor', 'Analysis on Electricity Generation Costs of Reduced Moderation Water Reactors' and 'Reprocessing Technology for Spent Mixed-Oxides Fuel from LWR'. Then five lectures followed: 'Micro Reactor Physics of MOX Fueled LWR' which shows the recent results of reactor physics, Fast Reactor Cooled by Supercritical Light Water' which is another type of reduced-moderation reactor, 'Phase 1 of Feasibility Studies on Commercialized Fast Breeder Reactor Cycle System' mainly conducted by Japan Nuclear Cycle Development Institute (JNC), 'Integral Type Small PWR with Stand-alone Safety' which is intended to suit for the future consumers' needs, and Utilization of Plutonium in Reduced-Moderation Water Reactors' which dictates benefits of plutonium utilization with RMWRs. This report includes the original papers presented at the workshop and summaries of the questions and answers for each lecture, as well as presentation handouts, program and participant list as appendixes. The 8 of the presented papers are indexed individually. (J.P.N.)

  10. Advanced light water reactors for the nineties

    International Nuclear Information System (INIS)

    Ross, F.A.; Sugnet, W.R.

    1987-01-01

    The EPRI/Industry advanced light water reactor (ALWR) program and the US Department of Energy ALWR program are closely coordinated to meet the common objective which is the availability of improved and simplified light water reactor plants that may be ordered in the next decade to meet new or replacement capacity requirements. The EPRI/Industry objectives, program participants, and foreign participants, utility requirements document, its organization and content, small plant conceptual design program, the DOE ALWR program, design verification program, General Electric ABWR design features, Combustion Engineering system design, mid-size plant development, General Electric SBWR objectives, Westinghouse/Burns and Roe design objectives, construction improvement, and improved instrumentation and control are discussed in the paper

  11. Fuel cladding interaction with water coolant in power reactors

    International Nuclear Information System (INIS)

    1985-11-01

    Water coolant chemistry and corrosion processes are important factors in reliable operation of NPP's, as at elevated temperatures water is aggressive towards structural materials. Water regimes for commercial Pressurized Water Reactors and Boiling Water Reactors were developed and proved to be satisfactory. Nevertheless, studies of operation experience continue and an amount of new Research and Development work is being conducted for further improvements of technology and better understanding of the physicochemical nature of those processes. In this report information is presented on the IAEA programme on fuel element cladding interaction with water coolant. Some results of this survey and recommendations made by the group of consultants who participated in this work are given as well as recommendations for continuation of this study. Separate abstracts were prepared for 6 papers of this report

  12. Experimental Investigation of the Hot Water Layer Effect on Upward Flow Open Pool Reactor Operability

    International Nuclear Information System (INIS)

    Abou Elmaaty, T.

    2014-01-01

    The open pool reactor offers a high degree of reliability in the handling and manoeuvring, the replacement of reactor internal components and the suing of vertical irradiation channels. The protection of both the operators and the reactor hall environment against radiation hazards is considered a matter of interest. So, a hot water layer is implemented above many of the research reactors main pool, especially those whose flow direction is upward flow. An experimental work was carried out to ensure the operability of the upward flow open pool research reactor with / without the hot water layer. The performed experiment showed that, the hot water layer is produced an inverse buoyant force make the water to diffuse downward against the ordinary natural circulation from the reactor core. An upward flow - open pool research reactor (with a power greater than 20 M watt) could not wok without a hot water layer. The high temperature of the hot water layer surface could release a considerable amount of water vapour into the reactor hall, so a heat and mass transfer model is built based on the measured hot water layer surface temperature to calculate the amount of released water vapour during the reactor operating period. The effects of many parameters like the ambient air temperature, the reactor hall relative humidity and the speed of the pushed air layer above the top pool end on the evaporation rate is studied. The current study showed that, the hot water layer system is considered an efficient shielding system against Gamma radiation for open pool upward flow reactor and that system should be operated before the reactor start up by a suitable period of time. While, the heat and mass transfer model results showed that, the amount of the released water vapour is increased as a result of both the increase in hot water layer surface temperature and the increase in air layer speed. As the increase in hot water layer surface temperature could produce a good operability

  13. Experimental Investigation of the Hot Water Layer Effect on Upward Flow Open Pool Reactor Operability

    International Nuclear Information System (INIS)

    Abou Elmaaty, T.

    2015-01-01

    The open pool reactor offers a high degree of reliability in the handling and manoeuvring, the replacement of reactor internal components and the swing of vertical irradiation channels. The protection of both the operators and the reactor hall environment against radiation hazards is considered a matter of interest. So, a hot water layer implemented above many of the research reactors main pool, especially those whose flow direction is upward flow. An experimental work was carried out to ensure the operability of the upward flow open pool research reactor with / without the hot water layer. The performed experiment showed that, the hot water layer produced an inverse buoyant force making the water to diffuse downward against the ordinary natural circulation from the reactor core. An upward flow-open pool research reactor (with a power greater than 20 Mw) could not wok without a hot water layer. The high temperature of the hot water layer surface could release a considerable amount of water vapour into the reactor hall, so a heat and mass transfer model is built based on the measured hot water layer surface temperature to calculate the amount of released water vapour during the reactor operating period. The effects of many parameters like the ambient air temperature, the reactor hall relative humidity and the speed of the pushed air layer above the top pool end on the evaporation rate is studied. The current study showed that, the hot water layer system is considered an efficient shielding system against gamma radiation for open pool upward flow reactor and that system should be operated before the reactor start up by a suitable period of time. While, the heat and mass transfer model results showed that, the amount of the released water vapour is increased as a result of both the increase in hot water layer surface temperature and the increase in air layer speed. As the increase in hot water layer surface temperature could produce a good operability conditions from

  14. Modeling the electrochemistry of the primary circuits of light water reactors

    International Nuclear Information System (INIS)

    Bertuch, A.; Macdonald, D.D.; Pang, J.; Kriksunov, L.; Arioka, K.

    1994-01-01

    To model the corrosion behaviors of the heat transport circuits of light water reactors, a mixed potential model (NTM) has been developed and applied to both boiling water reactors (BWRs) and pressurized water reactors (PWRs). Using the data generated by the GE/UKEA-Harwell radiolysis model, electrochemical potentials (ECPs) have been calculated for the heat transport circuits of eight BWRs operating under hydrogen water chemistry (HWC). By modeling the corrosion behaviors of these reactors, the effectiveness of HWC at limiting IGSCC and IASCC can be determined. For simulating PWR primary circuits, a chemical-radiolysis model (developed by the authors) was used to generate input parameters for the MPM. Corrosion potentials of Type 304 and 316 SSs in PWR primary environments were calculated using the NTM and were found to be in good agreement with the corrosion potentials measured in the laboratory for simulated PWR primary environments

  15. The pressurized water reactor

    International Nuclear Information System (INIS)

    Gallagher, J.L.

    1987-01-01

    Pressurized water reactor technology has reached a maturity that has engendered a new surge of innovation, which in turn, has led to significant advances in the technology. These advances, characterized by bold thinking but conservative execution, are resulting in nuclear plant designs which offer significant performance and safety improvements. This paper describes the innovations which are being designed into mainstream PWR technology as well as the desings which are resulting from such innovations. (author)

  16. Structural integrity of water reactor pressure boundary components

    International Nuclear Information System (INIS)

    Loss, F.J.

    1977-01-01

    The dynamic fracture toughness was determined as a function of temperature for three-point bend specimens of A533-B, A508-2, and A302-B steels. Crack propagation rates at 288 0 C in a water reactor environment were determined for A533-B and A508-2. Radiation-induced degradation of notch toughness of reactor steels and welds was explored. The ''warm prestress'' occurring in a flawed reactor vessel following a LOCA and operation of ECCS was studied. 25 figures

  17. Variation of the effectiveness of hydrogen water chemistry in a boiling water reactor during power coastdown operations

    International Nuclear Information System (INIS)

    Yeh Tsungkuang; Wang Meiya; Chu, Charles F.; Chang Ching

    2009-01-01

    A theoretical model was adapted to evaluate the impact of power coastdown on the water chemistry of a commercial boiling water reactor (BWR) in this work. In principle, the power density of a nuclear reactor upon a power level decrease would immediately be lowered, followed by water chemistry variations due to reduced radiolysis of water and extended coolant residence times in the core and near-core regions. It is currently a common practice for a commercial BWR to adopt hydrogen water chemistry (HWC) for corrosion mitigation. The optimal feedwater hydrogen concentration may be different after a power coastdown is implemented in a BWR. A computer code DEMACE was used in the current study to investigate the impact of various power coastdown levels on major radiolytic species concentrations and electrochemical corrosion potential (ECP) behavior of components in the primary coolant circuit of a domestic reactor operating under either normal water chemistry or HWC. Our analyses indicated that under a rated core flow rate the chemical species concentrations and the ECP did not vary monotonously with decreases in reactor power level at a fixed feedwater hydrogen concentration. In particular, ECP variations basically followed the patterns of hydrogen peroxide in the select regions and exhibited high values at power level of 90% for Reactor X. (author)

  18. Modelling of Control Bars in Calculations of Boiling Water Reactors

    International Nuclear Information System (INIS)

    Khlaifi, A.; Buiron, L.

    2004-01-01

    The core of a nuclear reactor is generally composed of a neat assemblies of fissile material from where neutrons were descended. In general, the energy of fission is extracted by a fluid serving to cool clusters. A reflector is arranged around the assemblies to reduce escaping of neutrons. This is made outside the reactor core. Different mechanisms of reactivity are generally necessary to control the chain reaction. Manoeuvring of Boiling Water Reactor takes place by controlling insertion of absorbent rods to various places of the core. If no blocked assembly calculations are known and mastered, blocked assembly neutronic calculation are delicate and often treated by case to case in present studies [1]. Answering the question how to model crossbar for the control of a boiling water reactor ? requires the choice of a representation level for every chain of variables, the physical model, and its representing equations, etc. The aim of this study is to select the best applicable parameter serving to calculate blocked assembly of a Boiling Water Reactor. This will be made through a range of representative configurations of these reactors and used absorbing environment, in order to illustrate strategies of modelling in the case of an industrial calculation. (authors)

  19. Fine element (F.E.) modelling of hydrogen migration and blister formation in PHWR coolant channels

    International Nuclear Information System (INIS)

    Prasad, P.S.; Dutta, B.K.; Sinha, R.K.; Kushwaha, H.S.; Mahajan, S.C.; Kakodkar, A.

    1995-01-01

    The formation of a cold spot in pressure tube due to its contact with calandria tube of PHWR coolant results in the migration of Hydrogen in pressure tube towards contact zone from its surrounding material. A 3-D finite element code SPARSH is developed to model the hydrogen redistribution and consequent hydride blister formation due to thermal and Hydrogen concentration gradients. In the present paper, the details and performance of this code are presented. (author). 6 refs., 2 figs

  20. Fuel Summary Report: Shippingport Light Water Breeder Reactor

    International Nuclear Information System (INIS)

    Illum, D.B.; Olson, G.L.; McCardell, R.K.

    1999-01-01

    The Shippingport Light Water Breeder Reactor (LWBR) was a small water cooled, U-233/Th-232 cycle breeder reactor developed by the Pittsburgh Naval Reactors to improve utilization of the nation's nuclear fuel resources in light water reactors. The LWBR was operated at Shippingport Atomic Power Station (APS), which was a Department of Energy (DOE) (formerly Atomic Energy Commission)-owned reactor plant. Shippingport APS was the first large-scale, central-station nuclear power plant in the United States and the first plant of such size in the world operated solely to produce electric power. The Shippingport LWBR was operated successfully from 1977 to 1982 at the APS. During the five years of operation, the LWBR generated more than 29,000 effective full power hours (EFPH) of energy. After final shutdown, the 39 core modules of the LWBR were shipped to the Expended Core Facility (ECF) at Naval Reactors Facility at the Idaho National Engineering and Environmental Laboratory (INEEL). At ECF, 12 of the 39 modules were dismantled and about 1000 of more than 17,000 rods were removed from the modules of proof-of-breeding and fuel performance testing. Some of the removed rods were kept at ECF, some were sent to Argonne National Laboratory-West (ANL-W) in Idaho and some to ANL-East in Chicago for a variety of physical, chemical and radiological examinations. All rods and rod sections remaining after the experiments were shipped back to ECF, where modules and loose rods were repackaged in liners for dry storage. In a series of shipments, the liners were transported from ECF to Idaho Nuclear Technology Engineering Center (INTEC), formerly the Idaho Chemical Processing Plant (ICPP). The 47 liners containing the fully-rodded and partially-derodded core modules, the loose rods, and the rod scraps, are now stored in underground dry wells at CPP-749

  1. Conceptual mechanical design for a pressure-tube type supercritical water-cooled reactor

    Energy Technology Data Exchange (ETDEWEB)

    Yetisir, M.; Diamond, W.; Leung, L.K.H.; Martin, D.; Duffey, R. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2011-07-01

    This paper presents a conceptual mechanical design for a heavy-water-moderated pressure-tube supercritical water (SCW) reactor, which has evolved from the well-established CANDU nuclear reactor. As in the current designs, the pressure-tube SCW reactor uses a calandria vessel and, as a result, many of today's technologies (such as the shutdown safety systems) can readily be adopted with small changes. Because the proposed concept uses a low-pressure moderator, it does not require a pressure vessel that is subject to the full SCW pressure and temperature conditions. The proposed design uses batch refueling and hence, the reactor core is orientated vertically. Significant simplifications result in the design with the elimination of on line fuelling systems, fuel channel end fittings and fuel channel closure seals and thus utilize the best features of Light Water Reactor (LWR) and Heavy Water Reactor (HWR) technologies. The safety goal is based on achieving a passive 'no core melt' configuration for the channels and core, so the mechanical features and systems directly reflect this desired attribute. (author)

  2. Conceptual mechanical design for a pressure-tube type supercritical water-cooled reactor

    International Nuclear Information System (INIS)

    Yetisir, M.; Diamond, W.; Leung, L.K.H.; Martin, D.; Duffey, R.

    2011-01-01

    This paper presents a conceptual mechanical design for a heavy-water-moderated pressure-tube supercritical water (SCW) reactor, which has evolved from the well-established CANDU nuclear reactor. As in the current designs, the pressure-tube SCW reactor uses a calandria vessel and, as a result, many of today's technologies (such as the shutdown safety systems) can readily be adopted with small changes. Because the proposed concept uses a low-pressure moderator, it does not require a pressure vessel that is subject to the full SCW pressure and temperature conditions. The proposed design uses batch refueling and hence, the reactor core is orientated vertically. Significant simplifications result in the design with the elimination of on line fuelling systems, fuel channel end fittings and fuel channel closure seals and thus utilize the best features of Light Water Reactor (LWR) and Heavy Water Reactor (HWR) technologies. The safety goal is based on achieving a passive 'no core melt' configuration for the channels and core, so the mechanical features and systems directly reflect this desired attribute. (author)

  3. Nuclear reactor with makeup water assist from residual heat removal system

    Science.gov (United States)

    Corletti, Michael M.; Schulz, Terry L.

    1993-01-01

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path.

  4. Nuclear reactor with makeup water assist from residual heat removal system

    International Nuclear Information System (INIS)

    Corletti, M.M.; Schulz, T.L.

    1993-01-01

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path. 2 figures

  5. Nuclear reactor with makeup water assist from residual heat removal system

    Science.gov (United States)

    Corletti, M.M.; Schulz, T.L.

    1993-12-07

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path. 2 figures.

  6. Potential uses of high gradient magnetic filtration for high-temperature water purification in boiling water reactors

    International Nuclear Information System (INIS)

    Elliott, H.H.; Holloway, J.H.; Abbott, D.G.

    1979-01-01

    Studies of various high-temperature filter devices indicate a potentially positive impact for high gradient magnetic filtration on boiling water reactor radiation level reduction. Test results on in-plant water composition and impurity crystallography are presented for several typical boiling water reactors (BWRs) on plant streams where high-temperature filtration may be particularly beneficial. An experimental model on the removal of red iron oxide (hematite) from simulated reactor water with a high gradient magnetic filter is presented, as well as the scale-up parameters used to predict the filtration efficiency on various high temperature, in-plant streams. Numerical examples are given to illustrate the crud removal potential of high gradient magnetic filters installed at alternative stream locations under typical, steady-state, plant operating conditions

  7. Coarse mesh finite element method for boiling water reactor physics analysis

    International Nuclear Information System (INIS)

    Ellison, P.G.

    1983-01-01

    A coarse mesh method is formulated for the solution of Boiling Water Reactor physics problems using two group diffusion theory. No fuel assembly cross-section homogenization is required; water gaps, control blades and fuel pins of varying enrichments are treated explicitly. The method combines constrained finite element discretization with infinite lattice super cell trial functions to obtain coarse mesh solutions for which the only approximations are along the boundaries between fuel assemblies. The method is applied to bench mark Boiling Water Reactor problems to obtain both the eigenvalue and detailed flux distributions. The solutions to these problems indicate the method is useful in predicting detailed power distributions and eigenvalues for Boiling Water Reactor physics problems

  8. Plutonium Recycle Test Reactor (PRTR). Operating Experience and Supporting R and D, Its Application to Heavy-Water Power Reactor Design and Operation

    Energy Technology Data Exchange (ETDEWEB)

    Harty, H. [Battelle Memorial Institute, Pacific Northwest Laboratories, Richland, WA (United States)

    1968-04-15

    Convincing answers to questions about heavy-water, pressure-tube, power reactors, e.g. pressure-tube serviceability, heavy-water management problems, long-term behaviour of special pressure-tube reactor components, and unique operating maintenance problems (compared to light-water reactors) must be based on actual operating experience with that type of reactor. PRTR operating experience and supporting R and D studies, although not always simple extrapolations to power reactors, can be summarized in a context applicable to future heavy-water power reactors, as follows: 1. Pressure-tube life, in a practical case, need not be limited by creep, gross hydriding, corrosion, or mechanical damage. The possibility that growth of a defect (perhaps service-induced) to a size that is critical under certain operating conditions, remains a primary unknown in pressure- tube life extrapolations. A pressure-tube failure in PRTR (combined with gross release of fuel material) proved only slightly more inconvenient, time consuming, and damaging to the reactor proper, than occurred with a gross failure of a fuel element in PRTR. 2. Routine operating losses of heavy water appear tractable in heavy-water-cooled power reactors; losses from low-pressure systems can be insignificant over the life of a plant. Non-routine losses may prove to be the largest component of loss over the life of a plant. 3. The performance of special components in PRTR, e.g. the calandria and shields, has not deteriorated despite being subjected to non-standard operating conditions. The calandria now contains a light-water reflector with single barrier separation from the heavy-water moderator. The carbon steel shields (containing carbon steel shot) show no deterioration based on pressure drop measurements and piping activation immediately outside the shields. The helium pressurization system (for primary coolant pressurization) remains a high maintenance system, and cannot be recommended for power reactors, based

  9. Effect of ionite decomposition products on the reactor coolant pH in a boiling-water reactor

    International Nuclear Information System (INIS)

    Bredikhin, V.Ya.; Moskvin, L.N.

    1982-01-01

    The effect of products resulting from thermal radiolysis of ionites on water-chemical regime of NPP with RBMK is considered basing on investigations conducted in a boiling type experimental reactor. Data are presented on dynamics of changes in the specific electric conductivity and pH of the coolant following destruction of ion exchange groups and ionite matrix under the effect of reactor radiation. The authors draw a conclusion that radiation destruction of ionito fine disperse suspension or high-molecular soluble compounds in the reactor are, probably, one of the main reasons for variations in pH values of the coolant at NPP in non-correction water chemical regime

  10. Meeting the physics design challenges of modern LWRs being inducted into the Indian nuclear power programme

    International Nuclear Information System (INIS)

    Jagannathan, V.; Pal, Usha; Karthikeyan, R.; Raj, Devesh; Srivastava, Argala; Khan, Suhail Ahmad

    2007-01-01

    Indian nuclear power programme started with the two Boiling Water Reactors (BWR) of 210 MWe capacity at Tarapur. Two VVER-1000 MWe reactors which are Pressurized Water Reactors (PWR) of Russian design are being constructed at Kudankulam, Tamilnadu and are expected to be commissioned by end 2008. There may be also a possibility of inducting some western PWRs in future. These reactors belong to the category of light water reactors (LWR). The LWRs are compact and have complex physical characteristics distinctly different from those of the Pressurized Heavy Water Reactors (PHWR) which, currently form the mainstay of our indigenous nuclear power programme. The physics design and analysis capability for the modern LWRs (BWR, PWR and VVER) has been developed at Light Water Reactors Physics Section, BARC. This paper presents the current state of art in this key technology area to meet the physics design and operation challenges when LWRs would be inducted in a major way into the Indian nuclear power programme and commence operating in the coming decades. (author)

  11. [Research of input water ratio's impact on the quality of effluent water from hydrolysis reactor].

    Science.gov (United States)

    Liang, Kang-Qiang; Xiong, Ya; Qi, Mao-Rong; Lin, Xiu-Jun; Zhu, Min; Song, Ying-Hao

    2012-11-01

    Based on high SS/BOD and low C/N ratio of waste water of municipal wastewater treatment plant, the structure of currently existing hydrolysis reactor was reformed to improve the influent quality. In order to strengthen the sludge hydrolysis and improve effluent water quality, two layers water distributors were set up so that the sludge hydrolysis zone was formed between the two layers distribution. For the purpose of the hydrolysis reactor not only plays the role of the primary sedimentation tank but also improves the effluent water biodegradability, input water ratios of the upper and lower water distributor in the experiment were changed to get the best input water ratio to guide the large-scale application of this sort hydrolysis reactor. Results show, four kinds of input water ratio have varying degrees COD and SS removal efficiency, however, input water ratio for 1 : 1 can substantially increase SCOD/COD ratio and VFA concentration of effluent water compared with the other three input water ratios. To improve the effluent biodegradability, input water ratio for 1 : 1 was chosen for the best input water ratio. That was the ratio of flow of upper distributor was 50%, and the ratio of the lower one was 50%, at this case it can reduce the processing burden of COD and SS for follow-up treatment, but also improve the biodegradability of the effluent.

  12. Heavy-Water Power Reactors. Proceedings Of A Symposium

    International Nuclear Information System (INIS)

    1968-01-01

    Proceedings of a Symposium organized by the IAEA and held in Vienna, 11-15 September 1967. The timeliness of the meeting was underlined by the large gathering of over 225 participants from 28 countries and three international organizations. Contents: Experience with heavy-water power and experimental reactors and projects (14 papers); New and advanced power reactor designs and concepts (8 papers); Development programmes and thorium cycle (9 papers); Economics and prospects of heavy-water power reactors (7 papers); Physics and fuel management (8 papers); Fuels (5 papers); Safety, control and engineering (6 papers); Panel discussion. Except for one Russian paper, which is published in English, each paper is in its original language (49 English and 8 French) and is preceded by an abstract in English with a second one in the original language if this is not English. Discussions are in English. (author)

  13. Heavy-Water Power Reactors. Proceedings Of A Symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1968-04-15

    Proceedings of a Symposium organized by the IAEA and held in Vienna, 11-15 September 1967. The timeliness of the meeting was underlined by the large gathering of over 225 participants from 28 countries and three international organizations. Contents: Experience with heavy-water power and experimental reactors and projects (14 papers); New and advanced power reactor designs and concepts (8 papers); Development programmes and thorium cycle (9 papers); Economics and prospects of heavy-water power reactors (7 papers); Physics and fuel management (8 papers); Fuels (5 papers); Safety, control and engineering (6 papers); Panel discussion. Except for one Russian paper, which is published in English, each paper is in its original language (49 English and 8 French) and is preceded by an abstract in English with a second one in the original language if this is not English. Discussions are in English. (author)

  14. Method of providing extended life expectancy for components of boiling water reactors

    International Nuclear Information System (INIS)

    Niedrach, L.W.

    1992-01-01

    This patent describes a containment for a boiling water nuclear reactor, a stainless steel containment, the containment having a deposit of a metal of the platinum group of metals on the surfaces thereof exposed to high temperature, high pressure water of the boiling water nuclear reactor

  15. Material Issues of Blanket Systems for Fusion Reactors - Compatibility with Cooling Water -

    Science.gov (United States)

    Miwa, Yukio; Tsukada, Takashi; Jitsukawa, Shiro

    Environmental assisted cracking (EAC) is one of the material issues for the reactor core components of light water power reactors(LWRs). Much experience and knowledge have been obtained about the EAC in the LWR field. They will be useful to prevent the EAC of water-cooled blanket systems of fusion reactors. For the austenitic stainless steels and the reduced-activation ferritic/martensitic steels, they clarifies that the EAC in a water-cooled blanket does not seem to be acritical issue. However, some uncertainties about influences on water temperatures, water chemistries and stress conditions may affect on the EAC. Considerations and further investigations elucidating the uncertainties are discussed.

  16. Neutron fluence determination for light water reactor pressure vessels

    International Nuclear Information System (INIS)

    Gold, R.

    1994-01-01

    A general description of limitations that exist in pressure vessel neutron fluence determinations for commercial light water reactors is presented. Complexity factors that arise in light water reactor pressure vessel neutron fluence calculations are identified and used to analyze calculational limitations. Two broad categories of calculational limitations are introduced, namely benchmark field limitations and deep penetration limitations. Explicit examples of limitations that can arise in each of these two broad categories are presented. These limitations are used to show that the recent draft regulatory guide for the determination of pressure vessel neutron fluence, developed by the Nuclear Regulatory Commission, is based upon procedures and assumptions that are not valid. To eliminate the complexity and limitations of calculational methods, it is recommended that the determination of light water reactor pressure vessel neutron fluence be based upon experiment. Recommendations for improved methods of pressure vessel surveillance neutron dosimetry are advanced

  17. The use of ferritic materials in light water reactor power plants

    International Nuclear Information System (INIS)

    Marston, T.V.

    1984-01-01

    This paper reviews the use of ferritic materials in LWR power plant components. The two principal types of LWR systems, the boiling water reactor (BWR) and the pressurized water reactor (PWR) are described. The evolution of the construction materials, including plates and forgings, is presented. The fabrication process for both reactors constructed with plates and forgings are described in detail. Typical mechanical properties of the reactor vessel materials are presented. Finally, one critical issue radiation embrittlement dealing with ferritic materials is discussed. This has been one of the major issues regarding the use of ferritic material in the construction of LWR pressure vessels

  18. Numerical analysis and scale experiment design of the hot water layer system of the Brazilian Multipurpose Reactor (RMB reactor)

    International Nuclear Information System (INIS)

    Schweizer, Fernando Lage Araújo

    2014-01-01

    The Brazilian Multipurpose Reactor (RMB) consists in a 30 MW open pool research reactor and its design is currently in development. The RMB is intended to produce a neutron flux applied at material irradiation for radioisotope production and materials and nuclear fuel tests. The reactor is immersed in a deep water pool needed for radiation shielding and thermal protection. A heating and purifying system is applied in research reactors with high thermal power in order to create a Hot Water Layer (HWL) on the pool top preventing that contaminated water from the reactor core neighboring reaches its surface reducing the room radiation dose rate. This dissertation presents a study of the HWL behavior during the reactor operation first hours where perturbations due to the cooling system and pool heating induce a mixing flow in the HWL reducing its protection. Numerical simulations using the CFD code CFX 14.0 have been performed for theoretical dose rate estimation during reactor operation, for a 1/10 scaled down model using dimensional analysis and mesh testing as an initial verification of the commercial code application. Equipment and sensor needed for an experimental bench project were defined by the CFD numerical simulation. (author)

  19. Simulation of LOCA power transients of CANDU6 by SCAN/RELAP-CANDU coupled code system

    International Nuclear Information System (INIS)

    Hong, In Seob; Kim, Chang Hyo; Hwang, Su Hyun; Kim, Man Woong; Chung, Bub Dong

    2004-01-01

    As can be seen in the standalone application of RELAP-CANDU for LOCA analysis of CANDU-PHWR, the system thermal-hydraulic code alone cannot predict the transient behavior accurately. Therefore, best estimate neutronics and system thermal-hydraulic coupled code system is necessary to describe the transient behavior with higher accuracy and reliability. The purpose of this research is to develop and test a coupled neutronics and thermal-hydraulics analysis code, SCAN (SNU CANDU-PHWR Neutronics) and RELAP-CANDU, for transient analysis of CANDU-PHWR's. For this purpose, a spatial kinetics calculation module of SCAN, a 3-D CANDU-PHWR neutronics design and analysis code, is dynamically coupled with RELAP-CANDU, the system thermal-hydraulic code for CANDU-PHWR. The performance of the coupled code system is examined by simulation of reactor power transients caused by a hypothetical Loss Of Coolant Accident (LOCA) in Wolsong units, which involves the insertion of positive void reactivity into the core in the course of transients. Specifically, a 40% Reactor Inlet Header (RIH) break LOCA was assumed for the test of the SCAN/RELAP-CANDU coupled code system analysis

  20. The Influence of RSG-GAS Primary Pump Operation Concerning the Rise Water Level of Reactor Pool in 15 MW Reactor Power

    International Nuclear Information System (INIS)

    Djunaidi

    2004-01-01

    The expansion of air volume in the delay chamber shows in rise water level of reactor pool during the operation. The rises of water level in the reactor pool is not quite from the expansion of air volume in the delay chamber, but some influence the primary pump operation. The purpose evaluated of influence primary pump is to know the influence primary pump power concerning the rise water level during the reactor operation. From the data collection during 15 MW power operation in the last core 42 the influence of primary pump operation concerning the rise water level in the reactor pool is 34.48 % from the total increased after operation during 12 days. (author)

  1. Flooding of a large, passive, pressure-tube light water reactor

    International Nuclear Information System (INIS)

    Hejzlar, P.; Todreas, N.E.; Driscoll, M.J.

    1997-01-01

    A reactor concept has been developed which can survive loss of coolant accidents without scram and without replenishing primary coolant inventory, while maintaining safe temperature limits on the fuel and pressure tubes. The proposed concept is a pressure tube type reactor of similar design to CANDU reactors, but differing in three key aspects. First, a solid SiC-coated graphite fuel matrix is used in place of fuel pin bundles to enable the dissipation of decay heat from the fuel in the absence of primary coolant. Second, the heavy water coolant in the pressure tubes is replaced by light water, which also serves as the moderator. Finally, the calandria tank, surrounded by a graphite reflector, contains a low pressure gas instead of heavy water moderator, and this normally-voided calandria is connected to a light water heat sink. The cover gas displaces the light water from the calandria during normal operation, while during loss of coolant or loss of heat sink accidents it allows passive calandria flooding. Calandria flooding also provides redundant and diverse reactor shutdown. This paper describes the thermal hydraulic characteristics of the passively initiated, gravity driven calandria flooding process. Flooding the calandria space with light water is a unique and very important feature of the proposed pressure-tube light water reactor (PTLWR) concept. The flooding of the top row of fuel channels must be accomplished fast enough so that in the total loss of coolant, none of the critical components of the fuel channel, i.e. the pressure tube, the calandria tube, the matrix and the fuel, exceed their design limits. The flooding process has been modeled and shown to be rapid enough to maintain all components within their design limits. (orig.)

  2. Materials technologies of light water reactors

    International Nuclear Information System (INIS)

    Begley, R.

    1984-01-01

    Satisfactory materials performance is a key element in achieving reliable operation of light water reactors. Outstanding performance under rigorous operational conditions has been exhibited by pressure boundary components, core internals, fuel cladding, and other critical components of these systems. Corrosion and stress corrosion phenomena have, however, had an impact on plant availability, most notably relating to pipe cracking in BWR systems and steam generator corrosion in PWR systems. These experiences have stimulated extensive development activities by the nuclear industry in improved NDE techniques, investigation of corrosion phenomena, as well as improved materials and repair processes. This paper reviews key materials performance aspects of light water reactors with particular emphasis on the progress which has been made in modeling of corrosion phenomena, control of the plant operating environment, advanced material development, and application of sophisticated repair procedures. Implementation of this technology provides the basis for improved plant availability

  3. The chemistry of water reactor fuel

    International Nuclear Information System (INIS)

    Potter, P.E.

    1990-01-01

    In this paper, the authors discuss features of the changes in chemical constitution which occur in fuel and fuel rods for water reactors during operation and in fault conditions. The fuel for water reactors consists of pellets of urania (UO 2 ) clad in Zircaloy. An essential step in the prediction of the fate of all the radionuclides in a fault or accident is to possess a detailed knowledge of their chemical behavior at all stages of the development of such incidents. In this paper, the authors consider: the chemical constitution of fuel during operation at temperatures corresponding to rather low ratings, together with a quite detailed discussion of the chemistry within the fuel-clad gap; the behavior of fuel subjected to higher temperatures and ratings than those of contemporary fuel; and the changes in constitution on failure of fuel rods in fault or accident conditions

  4. 20% inlet header break analysis of Advanced Heavy Water Reactor

    International Nuclear Information System (INIS)

    Srivastava, A.; Gupta, S.K.; Venkat Raj, V.; Singh, R.; Iyer, K.

    2001-01-01

    The proposed Advanced Heavy Water Reactor (AHWR) is a 750 MWt vertical pressure tube type boiling light water cooled and heavy water moderated reactor. A passive design feature of this reactor is that the heat removal is achieved through natural circulation of primary coolant at all power levels, with no primary coolant pumps. Loss of coolant due to failure of inlet header results in depressurization of primary heat transport (PHT) system and containment pressure rise. Depressurization activates various protective and engineered safety systems like reactor trip, isolation condenser and advanced accumulator, limiting the consequences of the event. This paper discusses the thermal hydraulic transient analysis for evaluating the safety of the reactor, following 20% inlet header break using RELAP5/MOD3.2. For the analysis, the system is discretized appropriately to simulate possible flow reversal in one of the core paths during the transient. Various modeling aspects are discussed in this paper and predictions are made for different parameters like pressure, temperature, steam quality and flow in different parts of the Primary Heat Transport (PHT) system. Flow and energy discharges into the containment are also estimated for use in containment analysis. (author)

  5. Reactor core of light water-cooled reactor

    International Nuclear Information System (INIS)

    Miwa, Jun-ichi; Aoyama, Motoo; Mochida, Takaaki.

    1996-01-01

    In a reactor core of a light water cooled reactor, the center of the fuel rods or moderating rods situated at the outermost circumference among control rods or moderating rods are connected to divide a lattice region into an inner fuel region and an outer moderator region. In this case, the area ratio of the moderating region to the fuel region is determined to greater than 0.81 for every cross section of the fuel region. The moderating region at the outer side is increased relative to the fuel rod region at the inner side while keeping the lattice pitch of the fuel assembly constant, thereby suppressing the increase of an absolute value of a void reactivity coefficient which tends to be caused when using MOX fuels as a fuel material, by utilizing neutron moderation due to a large quantity of coolants at the outer side of the fuel region. The void reactivity coefficient can be made substantially equal with that of uranium fuel assembly without greatly reducing a plutonium loading amount or without greatly increasing linear power density. (N.H.)

  6. Power flattening and reactivity suppression strategies for the Canadian supercritical water reactor concept

    International Nuclear Information System (INIS)

    McDonald, M.; Colton, A.; Pencer, J.

    2015-01-01

    The Canadian supercritical water-cooled reactor (SCWR) is a conceptual heavy water moderated, supercritical light water cooled pressure tube reactor. In contrast to current heavy water power reactors, the Canadian SCWR will be a batch fuelled reactor. Associated with batch fuelling is a large beginning-of-cycle excess reactivity. Furthermore, radial power peaking arising as a consequence of batch refuelling must be mitigated in some way. In this paper, burnable neutron absorber (BNA) added to fuel and absorbing rods inserted into the core are considered for reactivity management and power flattening. A combination of approaches appears adequate to reduce the core radial power peaking, while also providing reactivity suppression. (author)

  7. Fixed-biofilm reactors applied to waste water treatment and aquacultural water recirculating systems

    NARCIS (Netherlands)

    Bovendeur, J.

    1989-01-01

    Fixed-biofilm waste water treatment may be regarded as one of the oldest engineered biological waste water treatment methods. With the recent introduction of modern packing materials, this type of reactor has received a renewed impuls for implementation in a wide field of water treatment.

    In

  8. Fission gas behaviour in water reactor fuels

    International Nuclear Information System (INIS)

    2002-01-01

    During irradiation, nuclear fuel changes volume, primarily through swelling. This swelling is caused by the fission products and in particular by the volatile ones such as krypton and xenon, called fission gas. Fission gas behaviour needs to be reliably predicted in order to make better use of nuclear fuel, a factor which can help to achieve the economic competitiveness required by today's markets. These proceedings communicate the results of an international seminar which reviewed recent progress in the field of fission gas behaviour in light water reactor fuel and sought to improve the models used in computer codes predicting fission gas release. State-of-the-art knowledge is presented for both uranium-oxide and mixed-oxide fuels loaded in water reactors. (author)

  9. Issues affecting advanced passive light-water reactor safety analysis

    International Nuclear Information System (INIS)

    Beelman, R.J.; Fletcher, C.D.; Modro, S.M.

    1992-01-01

    Next generation commercial reactor designs emphasize enhanced safety through improved safety system reliability and performance by means of system simplification and reliance on immutable natural forces for system operation. Simulating the performance of these safety systems will be central to analytical safety evaluation of advanced passive reactor designs. Yet the characteristically small driving forces of these safety systems pose challenging computational problems to current thermal-hydraulic systems analysis codes. Additionally, the safety systems generally interact closely with one another, requiring accurate, integrated simulation of the nuclear steam supply system, engineered safeguards and containment. Furthermore, numerical safety analysis of these advanced passive reactor designs wig necessitate simulation of long-duration, slowly-developing transients compared with current reactor designs. The composite effects of small computational inaccuracies on induced system interactions and perturbations over long periods may well lead to predicted results which are significantly different than would otherwise be expected or might actually occur. Comparisons between the engineered safety features of competing US advanced light water reactor designs and analogous present day reactor designs are examined relative to the adequacy of existing thermal-hydraulic safety codes in predicting the mechanisms of passive safety. Areas where existing codes might require modification, extension or assessment relative to passive safety designs are identified. Conclusions concerning the applicability of these codes to advanced passive light water reactor safety analysis are presented

  10. Technology development for special nuclear components

    International Nuclear Information System (INIS)

    Sanatkumar, A.

    1994-01-01

    One of the attractive features of Candu Pressurised Heavy Water Reactor design which influenced the decision to make it the foundation of our nuclear power programme, is that its main components (calandria, end shields, coolant channel components) are relatively simple - in comparison with reactor pressure vessel and associated components of Boiling Water Reactors or Pressurised Water Reactors - and considered to be within the scope of manufacture of developing countries. Over the last two decades, India has been very successful in technology development in many important and critical areas. We are now about to launch the construction of the first 500 MWe PHWR project at Tarapur. In this context, this paper focuses attention on some of the aspects relating to self-reliance in design, engineering and manufacture of these special components as currently perceived. (author). 3 refs

  11. Integrity of the reactor coolant boundary of the European pressurized water reactor (EPR)

    Energy Technology Data Exchange (ETDEWEB)

    Goetsch, D.; Bieniussa, K.; Schulz, H.; Jalouneix, J.

    1997-04-01

    This paper is an abstract of the work performed in the frame of the development of the IPSN/GRS approach in view of the EPR conceptual safety features. EPR is a pressurized water reactor which will be based on the experience gained by utilities and designers in France and in Germany. The reactor coolant boundary of a PWR includes the reactor pressure vessel (RPV), those parts of the steam generators (SGs) which contain primary coolant, the pressurizer (PSR), the reactor coolant pumps (RCPs), the main coolant lines (MCLs) with their branches as well as the other connecting pipes and all branching pipes including the second isolation valves. The present work covering the integrity of the reactor coolant boundary is mainly restricted to the integrity of the main coolant lines (MCLs) and reflects the design requirements for the main components of the reactor coolant boundary. In the following the conceptual aspects, i.e. design, manufacture, construction and operation, will be assessed. A main aspect is the definition of break postulates regarding overall safety implications.

  12. Integrity of the reactor coolant boundary of the European pressurized water reactor (EPR)

    International Nuclear Information System (INIS)

    Goetsch, D.; Bieniussa, K.; Schulz, H.; Jalouneix, J.

    1997-01-01

    This paper is an abstract of the work performed in the frame of the development of the IPSN/GRS approach in view of the EPR conceptual safety features. EPR is a pressurized water reactor which will be based on the experience gained by utilities and designers in France and in Germany. The reactor coolant boundary of a PWR includes the reactor pressure vessel (RPV), those parts of the steam generators (SGs) which contain primary coolant, the pressurizer (PSR), the reactor coolant pumps (RCPs), the main coolant lines (MCLs) with their branches as well as the other connecting pipes and all branching pipes including the second isolation valves. The present work covering the integrity of the reactor coolant boundary is mainly restricted to the integrity of the main coolant lines (MCLs) and reflects the design requirements for the main components of the reactor coolant boundary. In the following the conceptual aspects, i.e. design, manufacture, construction and operation, will be assessed. A main aspect is the definition of break postulates regarding overall safety implications

  13. Grey water treatment in upflow anaerobic sludge blanket (UASB) reactor at different temperatures.

    Science.gov (United States)

    Elmitwalli, Tarek; Otterpohl, Ralf

    2011-01-01

    The treatment of grey water in two upflow anaerobic sludge blanket (UASB) reactors, operated at different hydraulic retention times (HRTs) and temperatures, was investigated. The first reactor (UASB-A) was operated at ambient temperature (14-25 degrees C) and HRT of 20, 12 and 8 h, while the second reactor (UASB-30) was operated at controlled temperature of 30 degrees C and HRT of 16, 10 and 6 h. The two reactors were fed with grey water from 'Flintenbreite' settlement in Luebeck, Germany. When the grey water was treated in the UASB reactor at 30 degrees C, total chemical oxygen demand (CODt) removal of 52-64% was achieved at HRT between 6 and 16 h, while at lower temperature lower removal (31-41%) was obtained at HRT between 8 and 20 h. Total nitrogen and phosphorous removal in the UASB reactors were limited (22-36 and 10-24%, respectively) at all operational conditions. The results showed that at increasing temperature or decreasing HRT of the reactors, maximum specific methanogenic activity of the sludge in the reactors improved. As the UASB reactor showed a significantly higher COD removal (31-64%) than the septic tank (11-14%) even at low temperature, it is recommended to use UASB reactor instead of septic tank (the most common system) for grey water pre-treatment. Based on the achieved results and due to high peak flow factor, a HRT between 8 and 12 h can be considered the suitable HRT for the UASB reactor treating grey water at temperature 20-30 degrees C, while a HRT of 12-24 h can be applied at temperature lower than 20 degrees C.

  14. Thermal-Hydraulic Analysis of a Supercritical Water Reactor (SCWR) Core

    International Nuclear Information System (INIS)

    Kucukboyaci, V.N.; Oriani, L.

    2004-01-01

    The supercritical water reactor (SCWR) has been the object of interest throughout the nuclear Generation IV community because of its high potential: a simple, direct cycle, compact configuration; elimination of many traditional LWR components, operation at coolant temperatures much higher than traditional LWRs and thus high thermal efficiency. It could be said that the SWR was viewed as the water counterpart to the high temperature gas reactor

  15. Safety aspects of designs for future light water reactors (evolutionary reactors)

    International Nuclear Information System (INIS)

    1993-07-01

    The main purpose of this document is to describe the major innovations of proposed designs of future light water reactors, to describe specific safety characteristics and safety analysis methodologies, and to give a general overview of the most important safety aspects related to future reactors. The reactors considered in this report are limited to those intended for fixed station electrical power production, excluding most revolutionary concepts. More in depth discussion is devoted to those designs that are in a more advanced state of completion and have been more extensively described and analysed in the open literature. Other designs will be briefly described, as evidence of the large spectrum of new proposals. Some designs are similar; others implement unique features and require specific discussion (not all aspects of designs with unique features are fully discussed in this document). 131 refs, 22 figs

  16. Research on physical and chemical parameters of coolant in Light-Water Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Reis, Isabela C.; Mesquita, Amir Z., E-mail: icr@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEM-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The coolant radiochemical monitoring of light-water reactors, both power reactor as research reactors is one most important tasks of the system safe operation. The last years have increased the interest in the coolant chemical studying to optimize the process, to minimize the corrosion, to ensure the primary system materials integrity, and to reduce the workers exposure radiation. This paper has the objective to present the development project in Nuclear Technology Development Center (CDTN), which aims to simulate the primary water physical-chemical parameters of light-water-reactors (LWR). Among these parameters may be cited: the temperature, the pressure, the pH, the electric conductivity, and the boron concentration. It is also being studied the adverse effects that these parameters can result in the reactor integrity. The project also aims the mounting of a system to control and monitoring of temperature, electric conductivity, and pH of water in the Installation of Test in Accident Conditions (ITCA), located in the Thermal-Hydraulic Laboratory at CDTN. This facility was widely used in the years 80/90 for commissioning of several components that were installed in Angra 2 containment. In the test, the coolant must reproduce the physical and chemical conditions of the primary. It is therefore fundamental knowledge of the main control parameters of the primary cooling water from PWR reactors. Therefore, this work is contributing, with the knowledge and the reproduction with larger faithfulness of the reactors coolant in the experimental circuits. (author)

  17. Electrochemical potential measurements in boiling water reactors; relation to water chemistry and stress corrosion

    International Nuclear Information System (INIS)

    Indig, M.E.; Cowan, R.L.

    1981-01-01

    Electrochemical potential measurements were performed in operating boiling water reactors to determine the range of corrosion potentials that exist from cold standby to full power operation and the relationship of these measurements to reactor water chemistry. Once the corrosion potentials were known, experiments were performed in the laboratory under electrochemical control to determine potentials and equivalent dissolved oxygen concentrations where intergranular stress corrosion cracking (IGSCC) would and would not occur on welded Type-304 stainless steel. At 274 0 C, cracking occurred at potentials that were equivalent to dissolved oxygen concentration > 40 to 50 ppb. With decreasing temperature, IGSCC became more difficult and only severely sensitized stainless steel would crack. Recent in-reactor experiments combined with the previous laboratory data, have shown that injection of small concentrations of hydrogen during reactor operation can cause a significant decrease in corrosion potential which should cause immunity to IGSCC. (author)

  18. Development of alternative fuel for pressurized water reactors

    International Nuclear Information System (INIS)

    Cardoso, P.E.; Ferreira, R.A.N.; Ferraz, W.B.; Lameiras, F.S.; Santos, A.; Assis, G. de; Doerr, W.O.; Wehner, E.L.

    1984-01-01

    The utilization of alternative fuel cycles in Pressurized Water Reactors (PWR) such as Th/U and Th/Pu cycles can permit a better utilization of uranium reserves without the necessity of developing new power reactor concepts. The development of the technology of alternative fuels for PWR is one of the objectives of the 'Program on Thorium Utilization in Pressurized Water Reactors' carried out jointly by Empresas Nucleares Brasileiras S.A. (NUCLEBRAS), through its Centro de Desenvolvimento da Tecnologia Nuclear (CDTN) and by German institutions, the Julich Nuclear Research Center (KFA), the Kraftwerk Union A.G. (KWU) and NUKEM GmbH. This paper summarizes the results so far obtained in the fuel technology. The development of a fabrication process for PWR fuel pellets from gel-microspheres is reported as well as the design, the specification, and the fabrication of prototype fuel rods for irradiation tests. (Author) [pt

  19. Steam water cycle chemistry of liquid metal cooled innovative nuclear power reactors

    International Nuclear Information System (INIS)

    Yurmanov, Victor; Lemekhov, Vadim; Smykov, Vladimir

    2012-09-01

    selection of chemistry controls is vital for NPPs with liquid metal cooled reactors. This paper highlights principles and approaches to chemistry controls in steam/water cycles of future NPPs with innovative liquid metal cooled reactors. The recommendations on how to arrange chemistry controls in steam/water cycles of future NPPs with innovative liquid metal cooled reactors are based taking into account: - the experience with operation of fossil power industry; - secondary side water chemistry of lead-bismuth eutectics cooled nuclear reactors at submarines; - steam/water cycles of NPPs with sodium cooled fast breeders BN-350 and BN-600; - secondary water chemistry at conventional NPPs with WER, RBMK and some other reactors. (authors)

  20. Water Chemistry Control in Reducing Corrosion and Radiation Exposure at PWR Reactor

    International Nuclear Information System (INIS)

    Febrianto

    2006-01-01

    Water chemistry control plays an important role in relation to plant availability, reliability and occupational radiation exposures. Radiation exposures of nuclear plant workers are determined by the radiation rate dose and by the amount maintenance and repair work time Water chemistry has always been, from beginning of operation of power Pressurized Water Reactor, an important factor in determining the integrity of reactor components, fuel cladding integrity and minimize out of core radiation exposures. For primary system, the parameters to control the quality of water chemistry have been subject to change in time. Reactor water coolant pH need to be optimally controlled and be operated in range pH 6.9 to 7.4. At pH lower than 6.9, cause increasing the radiation exposure level and increasing coolant water pH higher than 7.4 will decrease radiation exposure level but increasing risk to fuel cladding and steam generator tube. Since beginning 90 decade, PWR water coolant pH tend to be operated at pH 7.4. This paper will discuss concerning water chemistry development in reducing corrosion and radiation exposure dose in PWR reactor. (author)