WorldWideScience

Sample records for waste verification system

  1. Packaged low-level waste verification system

    International Nuclear Information System (INIS)

    Tuite, K.T.; Winberg, M.; Flores, A.Y.; Killian, E.W.; McIsaac, C.V.

    1996-01-01

    Currently, states and low-level radioactive waste (LLW) disposal site operators have no method of independently verifying the radionuclide content of packaged LLW that arrive at disposal sites for disposal. At this time, disposal sites rely on LLW generator shipping manifests and accompanying records to insure that LLW received meets the waste acceptance criteria. An independent verification system would provide a method of checking generator LLW characterization methods and help ensure that LLW disposed of at disposal facilities meets requirements. The Mobile Low-Level Waste Verification System (MLLWVS) provides the equipment, software, and methods to enable the independent verification of LLW shipping records to insure that disposal site waste acceptance criteria are being met. The MLLWVS system was developed under a cost share subcontract between WMG, Inc., and Lockheed Martin Idaho Technologies through the Department of Energy's National Low-Level Waste Management Program at the Idaho National Engineering Laboratory (INEL)

  2. Packaged low-level waste verification system

    Energy Technology Data Exchange (ETDEWEB)

    Tuite, K.; Winberg, M.R.; McIsaac, C.V. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1995-12-31

    The Department of Energy through the National Low-Level Waste Management Program and WMG Inc. have entered into a joint development effort to design, build, and demonstrate the Packaged Low-Level Waste Verification System. Currently, states and low-level radioactive waste disposal site operators have no method to independently verify the radionuclide content of packaged low-level waste that arrives at disposal sites for disposition. At this time, the disposal site relies on the low-level waste generator shipping manifests and accompanying records to ensure that low-level waste received meets the site`s waste acceptance criteria. The subject invention provides the equipment, software, and methods to enable the independent verification of low-level waste shipping records to ensure that the site`s waste acceptance criteria are being met. The objective of the prototype system is to demonstrate a mobile system capable of independently verifying the content of packaged low-level waste.

  3. Inspection and verification of waste packages for near surface disposal

    International Nuclear Information System (INIS)

    2000-01-01

    Extensive experience has been gained with various disposal options for low and intermediate level waste at or near surface disposal facilities. Near surface disposal is based on proven and well demonstrated technologies. To ensure the safety of near surface disposal facilities when available technologies are applied, it is necessary to control and assure the quality of the repository system's performance, which includes waste packages, engineered features and natural barriers, as well as siting, design, construction, operation, closure and institutional controls. Recognizing the importance of repository performance, the IAEA is producing a set of technical publications on quality assurance and quality control (QA/QC) for waste disposal to provide Member States with technical guidance and current information. These publications cover issues on the application of QA/QC programmes to waste disposal, long term record management, and specific QA/QC aspects of waste packaging, repository design and R and D. Waste package QA/QC is especially important because the package is the primary barrier to radionuclide release from a disposal facility. Waste packaging also involves interface issues between the waste generator and the disposal facility operator. Waste should be packaged by generators to meet waste acceptance requirements set for a repository or disposal system. However, it is essential that the disposal facility operator ensure that waste packages conform with disposal facility acceptance requirements. Demonstration of conformance with disposal facility acceptance requirements can be achieved through the systematic inspection and verification of waste packages at both the waste generator's site and at the disposal facility, based on a waste package QA/QC programme established by the waste generator and approved by the disposal operator. However, strategies, approaches and the scope of inspection and verification will be somewhat different from country to country

  4. Verification and validation for waste disposal models

    International Nuclear Information System (INIS)

    1987-07-01

    A set of evaluation criteria has been developed to assess the suitability of current verification and validation techniques for waste disposal methods. A survey of current practices and techniques was undertaken and evaluated using these criteria with the items most relevant to waste disposal models being identified. Recommendations regarding the most suitable verification and validation practices for nuclear waste disposal modelling software have been made

  5. Complex-Wide Waste Flow Analysis V1.0 verification and validation report

    International Nuclear Information System (INIS)

    Hsu, K.M.; Lundeen, A.S.; Oswald, K.B.; Shropshire, D.E.; Robinson, J.M.; West, W.H.

    1997-01-01

    The complex-wide waste flow analysis model (CWWFA) was developed to assist the Department of Energy (DOE) Environmental Management (EM) Office of Science and Technology (EM-50) to evaluate waste management scenarios with emphasis on identifying and prioritizing technology development opportunities to reduce waste flows and public risk. In addition, the model was intended to support the needs of the Complex-Wide Environmental Integration (EMI) team supporting the DOE's Accelerating Cleanup: 2006 Plan. CWWFA represents an integrated environmental modeling system that covers the life cycle of waste management activities including waste generation, interim process storage, retrieval, characterization and sorting, waste preparation and processing, packaging, final interim storage, transport, and disposal at a final repository. The CWWFA shows waste flows through actual site-specific and facility-specific conditions. The system requirements for CWWFA are documented in the Technical Requirements Document (TRD). The TRD is intended to be a living document that will be modified over the course of the execution of CWWFA development. Thus, it is anticipated that CWWFA will continue to evolve as new requirements are identified (i.e., transportation, small sites, new streams, etc.). This report provides a documented basis for system verification of CWWFA requirements. System verification is accomplished through formal testing and evaluation to ensure that all performance requirements as specified in the TRD have been satisfied. A Requirement Verification Matrix (RVM) was used to map the technical requirements to the test procedures. The RVM is attached as Appendix A. Since February of 1997, substantial progress has been made toward development of the CWWFA to meet the system requirements. This system verification activity provides a baseline on system compliance to requirements and also an opportunity to reevaluate what requirements need to be satisfied in FY-98

  6. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  7. TRU waste certification and TRUPACT-2 payload verification

    International Nuclear Information System (INIS)

    Hunter, E.K.; Johnson, J.E.

    1990-01-01

    The Waste Isolation Pilot Plant (WIPP) established a policy that requires each waste shipper to verify that all waste shipments meet the requirements of the Waste Acceptance Criteria (WAC) prior to being shipped. This verification provides assurance that transuranic (TRU) wastes meet the criteria while still retained in a facility where discrepancies can be immediately corrected. Each Department of Energy (DOE) TRU waste facility planning to ship waste to the Waste Isolation Pilot Plant (WIPP) is required to develop and implement a specific program including Quality Assurance (QA) provisions to verify that waste is in full compliance with WIPP's WAC. This program is audited by a composite DOE and contractor audit team prior to granting the facility permission to certify waste. During interaction with the Nuclear Regulatory Commission (NRC) on payload verification for shipping in TRUPACT-II, a similar system was established by DOE. The TRUPACT-II Safety Analysis Report (SAR) contains the technical requirements and physical and chemical limits that payloads must meet (like the WAC). All shippers must plan and implement a payload control program including independent QA provisions. A similar composite audit team will conduct preshipment audits, frequent subsequent audits, and operations inspections to verify that all TRU waste shipments in TRUPACT-II meet the requirements of the Certificate of Compliance issued by the NRC which invokes the SAR requirements. 1 fig

  8. Requirements Verification Report AN Farm to 200E Waste Transfer System for Project W-314, Tank Farm Restoration and Safe Operations

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    1999-01-01

    This Requirements Verification Report (RVR) for Project W-314 ''AN Farm to 200E Waste Transfer System'' package provides documented verification of design compliance to all the applicable Project Development Specification (PDS) requirements. Additional PDS requirements verification will be performed during the project's procurement, construction, and testing phases, and the RVR will be updated to reflect this information as appropriate

  9. A review of technology for verification of waste removal from Hanford Underground Storage Tanks (WHC Issue 30)

    International Nuclear Information System (INIS)

    Thunborg, S.

    1994-09-01

    Remediation of waste from Underground Storage Tanks (UST) at the Hanford Waste storage sites will require removal of all waste to a nearly clean condition. Current requirements are 99% clean. In order to meet remediation legal requirements, a means to remotely verify that the waste has been removed to sufficient level is needed. This report discusses the requirements for verification and reviews major technologies available for inclusion in a verification system. The report presents two operational scenarios for verification of residual waste volume. Thickness verification technologies reviewed are Ultrasonic Sensors, Capacitance Type Sensors, Inductive Sensors, Ground Penetrating Radar, and Magnetometers. Of these technologies Inductive (Metal Detectors) and Ground Penetrating Radar appear to be the most suitable for use as waste thickness sensors

  10. TRU waste certification and TRUPACT-II payload verification

    International Nuclear Information System (INIS)

    Hunter, E.K.; Johnson, J.E.

    1990-01-01

    The Waste Isolation Pilot Plant (WIPP) established a policy (subsequently confirmed and required by DOE Order 5820.2A, Radioactive Waste Management, September 1988) that requires each waste shipper to verify that all waste shipments meet the requirements of the Waste Acceptance Criteria (WAC) prior to being shipped. This verification provides assurance that transuranic (TRU) wastes meet the criteria while still retained in a facility where discrepancies can be immediately corrected. In this manner, problems that would arise if WAC violations were discovered at the receiver, where corrective facilities are not available, are avoided. Each Department of Energy (DOE) TRU waste facility planning to ship waste to the Waste Isolation Pilot Plant (WIPP) is required to develop and implement a specific program including Quality Assurance (QA) provisions to verify that waste is in full compliance with WIPP's WAC. This program is audited by a composite DOE and contractor audit team prior to granting the facility permission to certify waste. During interaction with the Nuclear Regulatory Commission (NRC) on payload verification for shipping in TRUPACT-II, a similar system was established by DOE. The TRUPACT-II Safety Analysis Report (SAR) contains the technical requirements and physical and chemical limits that payloads must meet (like the WAC). All shippers must plan and implement a payload control program including independent QA provisions. A similar composite audit team will conduct preshipment audits, frequent subsequent audits, and operations inspections to verify that all TRU waste shipments in TRUPACT-II meet the requirements of the Certificate of Compliance (C of C) issued by the NRC which invokes the SAR requirements. 1 fig

  11. Remaining Sites Verification Package for the 1607-F4 Sanitary Sewer System. Attachment to Waste Site Reclassification Form 2004-131

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2007-01-01

    The 1607-F4 waste site is the former location of the sanitary sewer system that serviced the former 115-F Gas Recirculation Building. The system included a septic tank, drain field, and associated pipeline that were in use from 1944 to 1965. The 1607-F4 waste site received unknown amounts of sanitary sewage from the 115-F Gas Recirculation Building and may have potentially contained hazardous and radioactive contamination. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  12. Verification and validation of the decision analysis model for assessment of TWRS waste treatment strategies

    International Nuclear Information System (INIS)

    Awadalla, N.G.; Eaton, S.C.F.

    1996-01-01

    This document is the verification and validation final report for the Decision Analysis Model for Assessment of Tank Waste Remediation System Waste Treatment Strategies. This model is also known as the INSIGHT Model

  13. Nuclear Energy Advanced Modeling and Simulation Waste Integrated Performance and Safety Codes (NEAMS Waste IPSC) verification and validation plan. version 1.

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe Ainsworth; Arguello, Jose Guadalupe, Jr.; Urbina, Angel; Bouchard, Julie F.; Edwards, Harold Carter; Freeze, Geoffrey A.; Knupp, Patrick Michael; Wang, Yifeng; Schultz, Peter Andrew; Howard, Robert (Oak Ridge National Laboratory, Oak Ridge, TN); McCornack, Marjorie Turner

    2011-01-01

    The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Waste Integrated Performance and Safety Codes (NEAMS Waste IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. To meet this objective, NEAMS Waste IPSC M&S capabilities will be applied to challenging spatial domains, temporal domains, multiphysics couplings, and multiscale couplings. A strategic verification and validation (V&V) goal is to establish evidence-based metrics for the level of confidence in M&S codes and capabilities. Because it is economically impractical to apply the maximum V&V rigor to each and every M&S capability, M&S capabilities will be ranked for their impact on the performance assessments of various components of the repository systems. Those M&S capabilities with greater impact will require a greater level of confidence and a correspondingly greater investment in V&V. This report includes five major components: (1) a background summary of the NEAMS Waste IPSC to emphasize M&S challenges; (2) the conceptual foundation for verification, validation, and confidence assessment of NEAMS Waste IPSC M&S capabilities; (3) specifications for the planned verification, validation, and confidence-assessment practices; (4) specifications for the planned evidence information management system; and (5) a path forward for the incremental implementation of this V&V plan.

  14. Remaining Sites Verification Package for the 1607-F3 Sanitary Sewer System, Waste Site Reclassification Form 2006-047

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2007-04-26

    The 1607-F3 waste site is the former location of the sanitary sewer system that supported the 182-F Pump Station, the 183-F Water Treatment Plant, and the 151-F Substation. The sanitary sewer system included a septic tank, drain field, and associated pipeline, all in use between 1944 and 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  15. Development of the clearance level verification evaluation system. 2. Construction of the clearance data management system

    International Nuclear Information System (INIS)

    Kubota, Shintaro; Usui, Hideo; Kawagoshi, Hiroshi

    2014-06-01

    Clearance is defined as the removal of radioactive materials or radioactive objects within authorized practices from any further regulatory control by the regulatory body. In Japan, clearance level and a procedure for its verification has been introduced under the Laws and Regulations, and solid clearance wastes inspected by the national authority can be handled and recycled as normal wastes. The most prevalent type of wastes have generated from the dismantling of nuclear facilities, so the Japan Atomic Energy Agency (JAEA) has been developing the Clearance Level Verification Evaluation System (CLEVES) as a convenient tool. The Clearance Data Management System (CDMS), which is a part of CLEVES, has been developed to support measurement, evaluation, making and recording documents with clearance level verification. In addition, validation of the evaluation result of the CDMS was carried out by inputting the data of actual clearance activities in the JAEA. Clearance level verification is easily applied by using the CDMS for the clearance activities. (author)

  16. Study of applicable methods on safety verification of disposal facilities and waste packages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Three subjects about safety verification on the disposal of low level radioactive waste were investigated in FY. 2012. For radioactive waste disposal facilities, specs and construction techniques of covering with soil to prevent possible destruction caused by natural events (e.g. earthquake) were studied to consider verification methods for those specs. For waste packages subject to near surface pit disposal, settings of scaling factor and average radioactivity concentration (hereafter referred to as ''SF'') on container-filled and solidified waste packages generated from Kashiwazaki Kariwa Nuclear Power Station Unit 1-5, setting of cesium residual ratio of molten solidified waste generated from Tokai and Tokai No.2 Power Stations, etc. were studied. Those results were finalized in consideration of the opinion from advisory panel, and publicly opened as JNES-EV reports. In FY 2012, five JNES reports were published and these have been used as standards of safety verification on waste packages. The verification method of radioactive wastes subject to near-surface trench disposal and intermediate depth disposal were also studied. For radioactive wastes which will be returned from overseas, determination methods of radioactive concentration, heat rate and hydrogen generation rate of CSD-C were established. Determination methods of radioactive concentration and heat rate of CSD-B were also established. These results will be referred to verification manuals. (author)

  17. Remaining Sites Verification Package for the 100-F-31, 144-F Sanitary Sewer System, Waste Site Reclassification Form 2006-033

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-08-24

    The 100-F-31 waste site is a former septic system that supported the inhalation laboratories, also referred to as the 144-F Particle Exposure Laboratory (132-F-2 waste site), which housed animals exposed to particulate material. The 100-F-31 waste site has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  18. Cleanup Verification Package for the 600-259 Waste Site

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Capron

    2006-02-09

    This cleanup verification package documents completion of remedial action for the 600-259 waste site. The site was the former site of the Special Waste Form Lysimeter, consisting of commercial reactor isotope waste forms in contact with soils within engineered caissons, and was used by Pacific Northwest National Laboratory to collect data regarding leaching behavior for target analytes. A Grout Waste Test Facility also operated at the site, designed to test leaching rates of grout-solidified low-level radioactive waste.

  19. Cleanup Verification Package for the 600-259 Waste Site

    International Nuclear Information System (INIS)

    Capron, J.M.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 600-259 waste site. The site was the former site of the Special Waste Form Lysimeter, consisting of commercial reactor isotope waste forms in contact with soils within engineered caissons, and was used by Pacific Northwest National Laboratory to collect data regarding leaching behavior for target analytes. A Grout Waste Test Facility also operated at the site, designed to test leaching rates of grout-solidified low-level radioactive waste

  20. Cleanup Verification Package for the 300-18 Waste Site

    International Nuclear Information System (INIS)

    Capron, J.M.

    2005-01-01

    This cleanup verification package documents completion of remedial action for the 300-18 waste site. This site was identified as containing radiologically contaminated soil, metal shavings, nuts, bolts, and concrete

  1. Verification and update of BNL mixed waste survey

    International Nuclear Information System (INIS)

    Bowerman, B.S.; Siskind, B.

    1987-01-01

    This report briefly describes attempts to verify the results of a previous survey on the amount of mixed wastes generated at various facilities during 1985. The original survey indicated some lack of understanding of current EPA regulations. This telephone survey verification indicated a better understanding of these regulations in recent months. Changes in EPA regulations and the addition of new compounds to the list of hazardous wastes are causing problems for organizations trying to comply. 7 refs

  2. Verification of the waste flow follow-up and product-control system AVK and proposals for improvements in accordance with the guideline of the Federal Ministry of the Environment

    International Nuclear Information System (INIS)

    Zech, J.; Wimmer, J.

    1995-01-01

    The results of a verification of the waste flow follow-up and product-control system (AVK) are summarized. This verification was based on AVK version 2.20 with the MOPRO (product control module) version 2.30 and the ELA (underground-storage-at-Morsleben module) version 1.0. The basics of the most important evaluation criteria are to be found in the underground storage specifications for the ''Konrad'' and Morsleben stores and in the waste guideline of the federal ministry of the environment. Moreover, the draft ordinance on nuclear residual products and waste (AtRAV) was taken into account.- The documentation system AVK actually reflects the demands of the BMU guideline. Moreover, the AVK, and especially the modules for the determination of radioactivity, fulfill important tasks within the framework of product control. With a view to the observation of the waste guideline of the federal ministry of the environment, the study leads to some recommendations and improvement proposals, of which an outline is given. (orig./HP) [de

  3. TWRS system drawings and field verification

    International Nuclear Information System (INIS)

    Shepard, D.G.

    1995-01-01

    The Configuration Management Program combines the TWRS Labeling and O and M drawing and drawing verification programs. The combined program will produce system drawings for systems that are normally operated or have maintenance performed on the system, label individual pieces of equipment for proper identification, even if system drawings are not warranted, and perform verification of drawings that are identified as essential in Tank Farm Essential Drawing Plans. During fiscal year 1994, work was begun to label Tank Farm components and provide user friendly system based drawings for Tank Waste Remediation System (TWRS) operations and maintenance. During the first half of fiscal 1995, the field verification program continued to convert TWRS drawings into CAD format and verify the accuracy based on visual inspections. During the remainder of fiscal year 1995 these efforts will be combined into a single program providing system based drawings and field verification of TWRS equipment and facilities. This combined program for TWRS will include all active systems for tank farms. Operations will determine the extent of drawing and labeling requirements for single shell tanks, i.e. the electrical distribution, HVAC, leak detection, and the radiation monitoring system. The tasks required to meet these objectives, include the following: identify system boundaries or scope for drawing being verified; label equipment/components in the process systems with a unique Equipment Identification Number (EIN) per the TWRS Data Standard; develop system drawings that are coordinated by ''smart'' drawing numbers and/or drawing references as identified on H-14-020000; develop a Master Equipment List (MEL) multi-user data base application which will contain key information about equipment identified in the field; and field verify and release TWRS Operation and Maintenance (O and M) drawings

  4. Investigation of novel spent fuel verification system for safeguard application

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Haneol; Yim, Man-Sung [KAIST, Daejeon (Korea, Republic of)

    2016-10-15

    Radioactive waste, especially spent fuel, is generated from the operation of nuclear power plants. The final stage of radioactive waste management is disposal which isolates radioactive waste from the accessible environment and allows it to decay. The safety, security, and safeguard of a spent fuel repository have to be evaluated before its operation. Many researchers have evaluated the safety of a repository. These researchers calculated dose to public after the repository is closed depending on their scenario. Because most spent fuel repositories are non-retrievable, research on security or safeguards of spent fuel repositories have to be performed. Design based security or safeguard have to be developed for future repository designs. This study summarizes the requirements of future spent fuel repositories especially safeguards, and suggests a novel system which meets the safeguard requirements. Applying safeguards to a spent fuel repository is becoming increasingly important. The future requirements for a spent fuel repository are suggested by several expert groups, such as ASTOR in IAEA. The requirements emphasizes surveillance and verification. The surveillance and verification of spent fuel is currently accomplished by using the Cerenkov radiation detector while spent fuel is being stored in a fuel pool. This research investigated an advanced spent fuel verification system using a system which converts spent fuel radiation into electricity. The system generates electricity while it is conveyed from a transportation cask to a disposal cask. The electricity conversion system was verified in a lab scale experiment using an 8.51GBq Cs-137 gamma source.

  5. Investigation of novel spent fuel verification system for safeguard application

    International Nuclear Information System (INIS)

    Lee, Haneol; Yim, Man-Sung

    2016-01-01

    Radioactive waste, especially spent fuel, is generated from the operation of nuclear power plants. The final stage of radioactive waste management is disposal which isolates radioactive waste from the accessible environment and allows it to decay. The safety, security, and safeguard of a spent fuel repository have to be evaluated before its operation. Many researchers have evaluated the safety of a repository. These researchers calculated dose to public after the repository is closed depending on their scenario. Because most spent fuel repositories are non-retrievable, research on security or safeguards of spent fuel repositories have to be performed. Design based security or safeguard have to be developed for future repository designs. This study summarizes the requirements of future spent fuel repositories especially safeguards, and suggests a novel system which meets the safeguard requirements. Applying safeguards to a spent fuel repository is becoming increasingly important. The future requirements for a spent fuel repository are suggested by several expert groups, such as ASTOR in IAEA. The requirements emphasizes surveillance and verification. The surveillance and verification of spent fuel is currently accomplished by using the Cerenkov radiation detector while spent fuel is being stored in a fuel pool. This research investigated an advanced spent fuel verification system using a system which converts spent fuel radiation into electricity. The system generates electricity while it is conveyed from a transportation cask to a disposal cask. The electricity conversion system was verified in a lab scale experiment using an 8.51GBq Cs-137 gamma source

  6. Cleanup Verification Package for the 300 VTS Waste Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Mitchell, T.H.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 300 Area Vitrification Test Site, also known as the 300 VTS site. The site was used by Pacific Northwest National Laboratory as a field demonstration site for in situ vitrification of soils containing simulated waste

  7. Cleanup Verification Package for the 300 VTS Waste Site

    Energy Technology Data Exchange (ETDEWEB)

    S. W. Clark and T. H. Mitchell

    2006-03-13

    This cleanup verification package documents completion of remedial action for the 300 Area Vitrification Test Site, also known as the 300 VTS site. The site was used by Pacific Northwest National Laboratory as a field demonstration site for in situ vitrification of soils containing simulated waste.

  8. Remaining Sites Verification Package for the 1607-B2 Septic System and 100-B-14:2 Sanitary Sewer System, Waste Site Reclassification Form 2006-055

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2007-03-21

    The 1607-B2 waste site is a former septic system associated with various 100-B facilities, including the 105-B, 108-B, 115-B/C, and 185/190-B buildings. The site was evaluated based on confirmatory results for feeder lines within the 100-B-14:2 subsite and determined to require remediation. The 1607-B2 waste site has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  9. Software verification, model validation, and hydrogeologic modelling aspects in nuclear waste disposal system simulations. A paradigm shift

    International Nuclear Information System (INIS)

    Sheng, G.M.

    1994-01-01

    This work reviewed the current concept of nuclear waste disposal in stable, terrestrial geologic media with a system of natural and man-made multi-barriers. Various aspects of this concept and supporting research were examined with the emphasis on the Canadian Nuclear Fuel Waste Management Program. Several of the crucial issues and challenges facing the current concept were discussed. These include: The difficulties inherent in a concept that centres around lithologic studies; the unsatisfactory state of software quality assurance in the present computer simulation programs; and the lack of a standardized, comprehensive, and systematic procedure to carry out a rigorous process of model validation and assessment of simulation studies. An outline of such an approach was presented and some of the principles, tools and techniques for software verification were introduced and described. A case study involving an evaluation of the Canadian performance assessment computer program is presented. A new paradigm to nuclear waste disposal was advocated to address the challenges facing the existing concept. The RRC (Regional Recharge Concept) was introduced and its many advantages were described and shown through a modelling exercise. (orig./HP)

  10. Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    M. J. Appel and J. M. Capron

    2007-07-25

    This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes.

  11. Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground

    International Nuclear Information System (INIS)

    Appel, M.J.; Capron, J.M.

    2007-01-01

    This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes

  12. Los Alamos Plutonium Facility Waste Management System

    International Nuclear Information System (INIS)

    Smith, K.; Montoya, A.; Wieneke, R.; Wulff, D.; Smith, C.; Gruetzmacher, K.

    1997-01-01

    This paper describes the new computer-based transuranic (TRU) Waste Management System (WMS) being implemented at the Plutonium Facility at Los Alamos National Laboratory (LANL). The Waste Management System is a distributed computer processing system stored in a Sybase database and accessed by a graphical user interface (GUI) written in Omnis7. It resides on the local area network at the Plutonium Facility and is accessible by authorized TRU waste originators, count room personnel, radiation protection technicians (RPTs), quality assurance personnel, and waste management personnel for data input and verification. Future goals include bringing outside groups like the LANL Waste Management Facility on-line to participate in this streamlined system. The WMS is changing the TRU paper trail into a computer trail, saving time and eliminating errors and inconsistencies in the process

  13. Verification of Representative Sampling in RI waste

    International Nuclear Information System (INIS)

    Ahn, Hong Joo; Song, Byung Cheul; Sohn, Se Cheul; Song, Kyu Seok; Jee, Kwang Yong; Choi, Kwang Seop

    2009-01-01

    For evaluating the radionuclide inventories for RI wastes, representative sampling is one of the most important parts in the process of radiochemical assay. Sampling to characterized RI waste conditions typically has been based on judgment or convenience sampling of individual or groups. However, it is difficult to get a sample representatively among the numerous drums. In addition, RI waste drums might be classified into heterogeneous wastes because they have a content of cotton, glass, vinyl, gloves, etc. In order to get the representative samples, the sample to be analyzed must be collected from selected every drum. Considering the expense and time of analysis, however, the number of sample has to be minimized. In this study, RI waste drums were classified by the various conditions of the half-life, surface dose, acceptance date, waste form, generator, etc. A sample for radiochemical assay was obtained through mixing samples of each drum. The sample has to be prepared for radiochemical assay and although the sample should be reasonably uniform, it is rare that a completely homogeneous material is received. Every sample is shredded by a 1 ∼ 2 cm 2 diameter and a representative aliquot taken for the required analysis. For verification of representative sampling, classified every group is tested for evaluation of 'selection of representative drum in a group' and 'representative sampling in a drum'

  14. Cleanup Verification Package for the 600-47 Waste Site

    International Nuclear Information System (INIS)

    Cutlip, M.J.

    2005-01-01

    This cleanup verification package documents completion of interim remedial action for the 600-47 waste site. This site consisted of several areas of surface debris and contamination near the banks of the Columbia River across from Johnson Island. Contaminated material identified in field surveys included four areas of soil, wood, nuts, bolts, and other metal debris

  15. Cleanup Verification Package for the 118-B-1, 105-B Solid Waste Burial Ground

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance criteria for the 118-B-1, 105-B Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-B Reactor and P-10 Tritium Separation Project and also received waste from the 105-N Reactor. The burial ground received reactor hardware, process piping and tubing, fuel spacers, glassware, electrical components, tritium process wastes, soft wastes and other miscellaneous debris

  16. Remaining Sites Verification Package for the 116-C-3, 105-C Chemical Waste Tanks. Attachment to Waste Site Reclassification Form 2008-002

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2008-01-01

    The 116-C-3 waste site consisted of two underground storage tanks designed to receive mixed waste from the 105-C Reactor Metals Examination Facility chemical dejacketing process. Confirmatory evaluation and subsequent characterization of the site determined that the southern tank contained approximately 34,000 L (9,000 gal) of dejacketing wastes, and that the northern tank was unused. In accordance with this evaluation, the verification sampling and modeling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrate that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also show that residual contaminant concentrations are protective of groundwater and the Columbia River

  17. The grout/glass performance assessment code system (GPACS) with verification and benchmarking

    International Nuclear Information System (INIS)

    Piepho, M.G.; Sutherland, W.H.; Rittmann, P.D.

    1994-12-01

    GPACS is a computer code system for calculating water flow (unsaturated or saturated), solute transport, and human doses due to the slow release of contaminants from a waste form (in particular grout or glass) through an engineered system and through a vadose zone to an aquifer, well and river. This dual-purpose document is intended to serve as a user's guide and verification/benchmark document for the Grout/Glass Performance Assessment Code system (GPACS). GPACS can be used for low-level-waste (LLW) Glass Performance Assessment and many other applications including other low-level-waste performance assessments and risk assessments. Based on all the cses presented, GPACS is adequate (verified) for calculating water flow and contaminant transport in unsaturated-zone sediments and for calculating human doses via the groundwater pathway

  18. Development of decommissioning management system. 9. Remodeling to PC system and system verification by evaluation of real work

    International Nuclear Information System (INIS)

    Kondo, Hitoshi; Fukuda, Seiji; Okubo, Toshiyuki

    2004-03-01

    When the plan of decommissioning such as nuclear fuel cycle facilities and small-scale research reactors is examined, it is necessary to select the technology and the process of the work procedure, and to optimize the index (such as the radiation dose, the cost, amount of the waste, the number of workers, and the term of works, etc.) concerning dismantling the facility. In our waste management section, Development of the decommissioning management system, which is called 'DECMAN', for the support of making the decommissioning plan is advanced. DECMAN automatically calculates the index by using the facility data and dismantling method. This paper describes the remodeling of program to the personal computer and the system verification by evaluation of real work (Dismantling of the liquor dissolver in the old JOYO Waste Treatment Facility (the old JWTF), the glove boxes in Deuterium Critical Assembly (DCA), and the incinerator in Waste Dismantling Facility (WDF)). The outline of remodeling and verification is as follows. (1) Additional function: 1) Equipment arrangement mapping, 2) Evaluation of the radiation dose by using the air dose rate, 3) I/O of data that uses EXCEL (software). (2) Comparison of work amount between calculation value and results value: The calculation value is 222.67man·hour against the result value 249.40 man·hour in the old JWTF evaluation. (3) Forecast of accompanying work is predictable to multiply a certain coefficient by the calculation value. (4) A new idea that expected the amount of the work was constructed by using the calculation value of DECMAN. (author)

  19. Remaining Sites Verification Package for the 1607-B2 Septic System and 100-B-14:2 Sanitary Sewer System. Attachment to Waste Site Reclassification Form 2006-055 and 2004-006

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2007-01-01

    The 1607-B2 waste site is a former septic system associated with various 100-B facilities, including the 105-B, 108-B, 115-B/C, and 185/190-B buildings. The site was evaluated based on confirmatory results for feeder lines within the 100-B-14:2 subsite and determined to require remediation. The 1607-B2 waste site has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  20. Formal verification of algorithms for critical systems

    Science.gov (United States)

    Rushby, John M.; Von Henke, Friedrich

    1993-01-01

    We describe our experience with formal, machine-checked verification of algorithms for critical applications, concentrating on a Byzantine fault-tolerant algorithm for synchronizing the clocks in the replicated computers of a digital flight control system. First, we explain the problems encountered in unsynchronized systems and the necessity, and criticality, of fault-tolerant synchronization. We give an overview of one such algorithm, and of the arguments for its correctness. Next, we describe a verification of the algorithm that we performed using our EHDM system for formal specification and verification. We indicate the errors we found in the published analysis of the algorithm, and other benefits that we derived from the verification. Based on our experience, we derive some key requirements for a formal specification and verification system adequate to the task of verifying algorithms of the type considered. Finally, we summarize our conclusions regarding the benefits of formal verification in this domain, and the capabilities required of verification systems in order to realize those benefits.

  1. Verification Account Management System (VAMS)

    Data.gov (United States)

    Social Security Administration — The Verification Account Management System (VAMS) is the centralized location for maintaining SSA's verification and data exchange accounts. VAMS account management...

  2. Cleanup Verification Package for the 118-B-6, 108-B Solid Waste Burial Ground

    International Nuclear Information System (INIS)

    Proctor, M.L.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 118-B-6, 108-B Solid Waste Burial Ground. The 118-B-6 site consisted of 2 concrete pipes buried vertically in the ground and capped by a concrete pad with steel lids. The site was used for the disposal of wastes from the 'metal line' of the P-10 Tritium Separation Project.

  3. HDM/PASCAL Verification System User's Manual

    Science.gov (United States)

    Hare, D.

    1983-01-01

    The HDM/Pascal verification system is a tool for proving the correctness of programs written in PASCAL and specified in the Hierarchical Development Methodology (HDM). This document assumes an understanding of PASCAL, HDM, program verification, and the STP system. The steps toward verification which this tool provides are parsing programs and specifications, checking the static semantics, and generating verification conditions. Some support functions are provided such as maintaining a data base, status management, and editing. The system runs under the TOPS-20 and TENEX operating systems and is written in INTERLISP. However, no knowledge is assumed of these operating systems or of INTERLISP. The system requires three executable files, HDMVCG, PARSE, and STP. Optionally, the editor EMACS should be on the system in order for the editor to work. The file HDMVCG is invoked to run the system. The files PARSE and STP are used as lower forks to perform the functions of parsing and proving.

  4. Production controls (PC) and technical verification testing (TVT). A methodology for the control and tracking of LILW waste package conditioning

    International Nuclear Information System (INIS)

    Leon, A.M.; Nieto, J.L.L.; Garrido, J.G.

    2003-01-01

    As part of its low and intermediate level radioactive waste (LILW) characterisation and acceptance activities, ENRESA has set up a quality control programme that covers the different phases of radioactive waste package production and implies different levels of tracking in generation, assessment of activity and control of the documentation associated therewith. Furthermore, ENRESA has made available the mechanisms required for verification, depending on the results of periodic sampling, of the quality of the end product delivered by the waste producers. Both processes are included within the framework of two programmes of complementary activities: production controls (PC) and technical verification testing (TVT). (orig.)

  5. Validation of Embedded System Verification Models

    NARCIS (Netherlands)

    Marincic, J.; Mader, Angelika H.; Wieringa, Roelf J.

    The result of a model-based requirements verification shows that the model of a system satisfies (or not) formalised system requirements. The verification result is correct only if the model represents the system adequately. No matter what modelling technique we use, what precedes the model

  6. Verification and Examination Management of Complex Systems

    Directory of Open Access Journals (Sweden)

    Stian Ruud

    2014-10-01

    Full Text Available As ship systems become more complex, with an increasing number of safety-critical functions, many interconnected subsystems, tight integration to other systems, and a large amount of potential failure modes, several industry parties have identified the need for improved methods for managing the verification and examination efforts of such complex systems. Such needs are even more prominent now that the marine and offshore industries are targeting more activities and operations in the Arctic environment. In this paper, a set of requirements and a method for verification and examination management are proposed for allocating examination efforts to selected subsystems. The method is based on a definition of a verification risk function for a given system topology and given requirements. The marginal verification risks for the subsystems may then be evaluated, so that examination efforts for the subsystem can be allocated. Two cases of requirements and systems are used to demonstrate the proposed method. The method establishes a systematic relationship between the verification loss, the logic system topology, verification method performance, examination stop criterion, the required examination effort, and a proposed sequence of examinations to reach the examination stop criterion.

  7. Formal Verification of Continuous Systems

    DEFF Research Database (Denmark)

    Sloth, Christoffer

    2012-01-01

    and the verification procedures should be algorithmically synthesizable. Autonomous control plays an important role in many safety-critical systems. This implies that a malfunction in the control system can have catastrophic consequences, e.g., in space applications where a design flaw can result in large economic...... losses. Furthermore, a malfunction in the control system of a surgical robot may cause death of patients. The previous examples involve complex systems that are required to operate according to complex specifications. The systems cannot be formally verified by modern verification techniques, due...

  8. On Verification Modelling of Embedded Systems

    NARCIS (Netherlands)

    Brinksma, Hendrik; Mader, Angelika H.

    Computer-aided verification of embedded systems hinges on the availability of good verification models of the systems at hand. Such models must be much simpler than full design models or specifications to be of practical value, because of the unavoidable combinatorial complexities in the

  9. Finite element code FENIA verification and application for 3D modelling of thermal state of radioactive waste deep geological repository

    Science.gov (United States)

    Butov, R. A.; Drobyshevsky, N. I.; Moiseenko, E. V.; Tokarev, U. N.

    2017-11-01

    The verification of the FENIA finite element code on some problems and an example of its application are presented in the paper. The code is being developing for 3D modelling of thermal, mechanical and hydrodynamical (THM) problems related to the functioning of deep geological repositories. Verification of the code for two analytical problems has been performed. The first one is point heat source with exponential heat decrease, the second one - linear heat source with similar behavior. Analytical solutions have been obtained by the authors. The problems have been chosen because they reflect the processes influencing the thermal state of deep geological repository of radioactive waste. Verification was performed for several meshes with different resolution. Good convergence between analytical and numerical solutions was achieved. The application of the FENIA code is illustrated by 3D modelling of thermal state of a prototypic deep geological repository of radioactive waste. The repository is designed for disposal of radioactive waste in a rock at depth of several hundred meters with no intention of later retrieval. Vitrified radioactive waste is placed in the containers, which are placed in vertical boreholes. The residual decay heat of radioactive waste leads to containers, engineered safety barriers and host rock heating. Maximum temperatures and corresponding times of their establishment have been determined.

  10. Remaining Sites Verification Package for the 100-D-2 Lead Sheeting Waste Site. Attachment to Waste Site Reclassification Form 2007-030

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2008-01-01

    The 100-D-2 Lead Sheeting waste site was located approximately 50 m southwest of the 185-D Building and approximately 16 m north of the east/west oriented road. The site consisted of a lead sheet covering a concrete pad. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  11. Safety Verification for Probabilistic Hybrid Systems

    DEFF Research Database (Denmark)

    Zhang, Lijun; She, Zhikun; Ratschan, Stefan

    2010-01-01

    The interplay of random phenomena and continuous real-time control deserves increased attention for instance in wireless sensing and control applications. Safety verification for such systems thus needs to consider probabilistic variations of systems with hybrid dynamics. In safety verification o...... on a number of case studies, tackled using a prototypical implementation....

  12. Development of a high-pressure compaction system for non-combustible solid waste

    International Nuclear Information System (INIS)

    Yogo, S.; Hata, T.; Torita, K.; Yamamoto, K.; Karita, Y.

    1989-01-01

    In recent years, nuclear power plants in Japan have been in search of a means to reduce the volume of non-combustible solid wastes and therefore the application of a high-pressure compaction system has been in demand. Most non-combustible solid wastes have been packed in 200-litre drums for storage and the situation requires a high-pressure compaction system designed exclusively for 200-litre drums. The authors have developed a high-pressure compaction system which compresses 200-litre drums filled with non-combustible solid wastes and packs them into new woo-litre drums efficiently. This paper reports the outline of this high-pressure compaction system and the results of the full-scale verification tests

  13. Remaining Sites Verification Package for the 1607-F5 Sanitary Sewer System (124-F-5). Attachment to Waste Site Reclassification Form 2006-043

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 1607-F5 waste site is a former septic tank, tile field, and associated pipeline located within the 100-FR-1 Operable Unit that received sewage from the former 181-F Pumphouse. Lead, gamma-chlordane, and heptachlor epoxide were identified within or around the septic system at concentrations exceeding the direct exposure cleanup criteria. Multiple metal and pesticide constituents were also identified as exceeding the groundwater and river protection cleanup criteria. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  14. Remaining Sites Verification Package for the 1607-F1 Sanitary Sewer System (124-F-1) and the 100-F-26:8 (1607-F1) Sanitary Sewer Pipelines Waste Sites. Attachment to Waste Site Reclassification Forms 2004-130 and 2005-004

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2008-01-01

    The 100-F-26:8 waste site consisted of the underground pipelines that conveyed sanitary waste water from the 1701-F Gatehouse, 1709-F Fire Station, and the 1720-F Administrative Office to the 1607-F1 septic tank. The site has been remediated and presently exists as an open excavation. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  15. Biometric Technologies and Verification Systems

    CERN Document Server

    Vacca, John R

    2007-01-01

    Biometric Technologies and Verification Systems is organized into nine parts composed of 30 chapters, including an extensive glossary of biometric terms and acronyms. It discusses the current state-of-the-art in biometric verification/authentication, identification and system design principles. It also provides a step-by-step discussion of how biometrics works; how biometric data in human beings can be collected and analyzed in a number of ways; how biometrics are currently being used as a method of personal identification in which people are recognized by their own unique corporal or behavior

  16. Distorted Fingerprint Verification System

    Directory of Open Access Journals (Sweden)

    Divya KARTHIKAESHWARAN

    2011-01-01

    Full Text Available Fingerprint verification is one of the most reliable personal identification methods. Fingerprint matching is affected by non-linear distortion introduced in fingerprint impression during the image acquisition process. This non-linear deformation changes both the position and orientation of minutiae. The proposed system operates in three stages: alignment based fingerprint matching, fuzzy clustering and classifier framework. First, an enhanced input fingerprint image has been aligned with the template fingerprint image and matching score is computed. To improve the performance of the system, a fuzzy clustering based on distance and density has been used to cluster the feature set obtained from the fingerprint matcher. Finally a classifier framework has been developed and found that cost sensitive classifier produces better results. The system has been evaluated on fingerprint database and the experimental result shows that system produces a verification rate of 96%. This system plays an important role in forensic and civilian applications.

  17. Verification and Validation in Systems Engineering

    CERN Document Server

    Debbabi, Mourad; Jarraya, Yosr; Soeanu, Andrei; Alawneh, Luay

    2010-01-01

    "Verification and validation" represents an important process used for the quality assessment of engineered systems and their compliance with the requirements established at the beginning of or during the development cycle. Debbabi and his coauthors investigate methodologies and techniques that can be employed for the automatic verification and validation of systems engineering design models expressed in standardized modeling languages. Their presentation includes a bird's eye view of the most prominent modeling languages for software and systems engineering, namely the Unified Model

  18. Verification survey report of the south waste tank farm training/test tower and hazardous waste storage lockers at the West Valley demonstration project, West Valley, New York

    International Nuclear Information System (INIS)

    Weaver, Phyllis C.

    2012-01-01

    A team from ORAU's Independent Environmental Assessment and Verification Program performed verification survey activities on the South Test Tower and four Hazardous Waste Storage Lockers. Scan data collected by ORAU determined that both the alpha and alpha-plus-beta activity was representative of radiological background conditions. The count rate distribution showed no outliers that would be indicative of alpha or alpha-plus-beta count rates in excess of background. It is the opinion of ORAU that independent verification data collected support the site's conclusions that the South Tower and Lockers sufficiently meet the site criteria for release to recycle and reuse

  19. Project W-320, WRSS PCP: Procedure implementation verification

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List

  20. Uncertainty analysis of a nondestructive radioassay system for transuranic waste

    International Nuclear Information System (INIS)

    Harker, Y.D.; Blackwood, L.G.; Meachum, T.R.; Yoon, W.Y.

    1996-01-01

    Radioassay of transuranic waste in 207 liter drums currently stored at the Idaho National Engineering Laboratory is achieved using a Passive Active Neutron (PAN) nondestructive assay system. In order to meet data quality assurance requirements for shipping and eventual permanent storage of these drums at the Waste Isolation Pilot Plant in Carlsbad, New Mexico, the total uncertainty of the PAN system measurements must be assessed. In particular, the uncertainty calculations are required to include the effects of variations in waste matrix parameters and related variables on the final measurement results. Because of the complexities involved in introducing waste matrix parameter effects into the uncertainty calculations, standard methods of analysis (e.g., experimentation followed by propagation of errors) could not be implemented. Instead, a modified statistical sampling and verification approach was developed. In this modified approach the total performance of the PAN system is simulated using computer models of the assay system and the resultant output is compared with the known input to assess the total uncertainty. This paper describes the simulation process and illustrates its application to waste comprised of weapons grade plutonium-contaminated graphite molds

  1. Fiscal 1997 report of the development of high efficiency waste power generation technology. No.2 volume. Pilot plant verification test; Kokoritsu haikibutsu hatsuden gijutsu kaihatsu (pilot plant jissho shiken). 1997 nendo hokokusho (daini bunsatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    As to a high efficiency waste power generation system using general waste as fuel, the details of the following were described: design/construction management and operational study of pilot plant, design/manufacture/construction of pilot plant, and study of an optimal total system. Concerning the construction management and operational study, the paper described the application for governmental/official inspection procedures and taking inspection, process management of pilot plant, site patrol, safety management, management of trial run of pilot plant, drawing-up of a verification test plan and test run, etc. Relating to the design/manufacture/construction of pilot plant, an outline of the pilot plant was described. The paper also stated points to be considered in design of furnace structure and boiler structure, points to be considered of the verification test, etc. As to the study of an optimal total system, the following were described: survey of waste gasification/slagging power generation technology, basic study on RDF production process, survey of trends of waste power generation technology in the U.S., etc. 52 refs., 149 figs., 121 tabs.

  2. Verification and Performance Analysis for Embedded Systems

    DEFF Research Database (Denmark)

    Larsen, Kim Guldstrand

    2009-01-01

    This talk provides a thorough tutorial of the UPPAAL tool suite for, modeling, simulation, verification, optimal scheduling, synthesis, testing and performance analysis of embedded and real-time systems.......This talk provides a thorough tutorial of the UPPAAL tool suite for, modeling, simulation, verification, optimal scheduling, synthesis, testing and performance analysis of embedded and real-time systems....

  3. Temporal Specification and Verification of Real-Time Systems.

    Science.gov (United States)

    1991-08-30

    of concrete real - time systems can be modeled adequately. Specification: We present two conservative extensions of temporal logic that allow for the...logic. We present both model-checking algorithms for the automatic verification of finite-state real - time systems and proof methods for the deductive verification of real - time systems .

  4. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT, SWINE WASTE ELECTRIC POWER AND HEAT PRODUCTION--CAPSTONE 30KW MICROTURBINE SYSTEM

    Science.gov (United States)

    Under EPA’s Environmental Technology Verification program, which provides objective and scientific third party analysis of new technology that can benefit the environment, a combined heat and power system was evaluated based on the Capstone 30kW Microturbine developed by Cain Ind...

  5. In situ object counting system (ISOCSi3TM) technique: A cost-effective tool for NDA verification in IAEA Safeguards

    International Nuclear Information System (INIS)

    Nizhnik, V.; Belian, A.; Shephard, A.; Lebrun, A.

    2011-01-01

    Nuclear material measurements using the ISOCS technique are playing an increasing role in IAEA verification activities. The ISOCS capabilities include: a high sensitivity to the presence of U and Pu; the ability to detect very small amounts of material; and the ability to measure items of different shapes and sizes. In addition, the numerical absolute efficiency calibration of a germanium detector used in the technique does not require any calibration standards or reference materials. The ISOCS modelling software performs an absolute efficiency calibration for items with various container shapes, container wall materials, material compositions, material fill-heights, U/Pu weight fractions and even heterogeneously distributed emitting materials. In a number of cases, some key parameters, such as the matrix density and U/Pu weight fraction, can be determined in addition to the emitting material mass and isotopic composition. These capabilities provide a verification solution suitable for a majority of cases where quantitative and isotopic analysis should be performed. Taking into account these advantages, the technique becomes a cost-effective solution for nuclear material non-destructive assay (NDA) verification. At present, the IAEA uses the ISOCS for a wide range of applications including the quantitative analysis of U scrap materials, U/Pu contaminated solid wastes, U fuel elements, U hold-up materials. Additionally, the ISOCS is also applied to some specific verification cases such as the measurement of PuBe neutron sources and the quantification of fission products in solid wastes. In reprocessing facilities with U/Pu waste compaction or facilities with item re-batching, the continuity-of-knowledge can be assured by applying either video surveillance systems together with seals (requiring attaching/detaching and verification activities for each seal) or verification of operator declarations using quantitative measurements for items selected on a random basis

  6. Remaining Sites Verification Package for the 120-F-1 Glass Dump Waste Site. Attachment to Waste Site Reclassification Form 2008-028

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 120-F-1 waste site consisted of two dumping areas located 660 m southeast of the 105-F Reactor containing laboratory equipment and bottles, demolition debris, light bulbs and tubes, small batteries, small drums, and pesticide contaminated soil. It is probable that 108-F was the source of the debris but the material may have come from other locations within the 100-F Area. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  7. Remaining Sites Verification Package for the 600-233 Waste Site, Vertical Pipe Near 100-B Electrical Laydown Area. Attachment to Waste Site Reclassification Form 2005-041

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2005-01-01

    The 600-233 waste site consisted of three small-diameter pipelines within the 600-232 waste site, including previously unknown diesel fuel supply lines discovered during site remediation. The 600-233 waste site has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  8. Logic verification system for power plant sequence diagrams

    International Nuclear Information System (INIS)

    Fukuda, Mitsuko; Yamada, Naoyuki; Teshima, Toshiaki; Kan, Ken-ichi; Utsunomiya, Mitsugu.

    1994-01-01

    A logic verification system for sequence diagrams of power plants has been developed. The system's main function is to verify correctness of the logic realized by sequence diagrams for power plant control systems. The verification is based on a symbolic comparison of the logic of the sequence diagrams with the logic of the corresponding IBDs (interlock Block Diagrams) in combination with reference to design knowledge. The developed system points out the sub-circuit which is responsible for any existing mismatches between the IBD logic and the logic realized by the sequence diagrams. Applications to the verification of actual sequence diagrams of power plants confirmed that the developed system is practical and effective. (author)

  9. Remaining Sites Verification Package for the 128-B-2, 100-B Burn Pit No.2 Waste Site. Attchment to Waste Site Reclassification Form 2005-038

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2005-01-01

    The 128-B-2 waste site was a burn pit historically used for the disposal of combustible and noncombustible wastes, including paint and solvents, office waste, concrete debris, and metallic debris. This site has been remediated by removing approximately 5,627 bank cubic meters of debris, ash, and contaminated soil to the Environmental Restoration Disposal Facility. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  10. Formal Verification of Real-Time System Requirements

    Directory of Open Access Journals (Sweden)

    Marcin Szpyrka

    2000-01-01

    Full Text Available The methodology of system requirements verification presented in this paper is a proposition of a practical procedure for reducing some negatives of the specification of requirements. The main problem that is considered is to create a complete description of the system requirements without any negatives. Verification of the initially defined requirements is based on the coloured Petri nets. Those nets are useful for testing some properties of system requirements such as completeness, consistency and optimality. An example ofthe litt controller is presented.

  11. Compositional verification of real-time systems using Ecdar

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Legay, Axel

    2012-01-01

    We present a specification theory for timed systems implemented in the Ecdar tool. We illustrate the operations of the specification theory on a running example, showing the models and verification checks. To demonstrate the power of the compositional verification, we perform an in depth case study...... of a leader election protocol; Modeling it in Ecdar as Timed input/output automata Specifications and performing both monolithic and compositional verification of two interesting properties on it. We compare the execution time of the compositional to the classical verification showing a huge difference...

  12. A Synthesized Framework for Formal Verification of Computing Systems

    Directory of Open Access Journals (Sweden)

    Nikola Bogunovic

    2003-12-01

    Full Text Available Design process of computing systems gradually evolved to a level that encompasses formal verification techniques. However, the integration of formal verification techniques into a methodical design procedure has many inherent miscomprehensions and problems. The paper explicates the discrepancy between the real system implementation and the abstracted model that is actually used in the formal verification procedure. Particular attention is paid to the seamless integration of all phases of the verification procedure that encompasses definition of the specification language and denotation and execution of conformance relation between the abstracted model and its intended behavior. The concealed obstacles are exposed, computationally expensive steps identified and possible improvements proposed.

  13. Remaining Sites Verification Package for the 128-F-2, 100-F Burning Pit Waste Site, Waste Site Reclassification Form 2008-031

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Capron

    2008-12-01

    The 128-F-2 waste site consisted of multiple burn and debris filled pits located directly east of the 107-F Retention Basin and approximately 30.5 m east of the northeast corner of the 100-F Area perimeter road that runs along the riverbank. The burn pits were used for incinerating nonradioactive, combustible materials from 1945 to 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  14. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  15. Parallel verification of dynamic systems with rich configurations

    OpenAIRE

    Pessoa, Eduardo José Dias

    2016-01-01

    Dissertação de mestrado em Engenharia Informática (área de especialização em Informática) Model checking is a technique used to automatically verify a model which represents the specification of some system. To ensure the correctness of the system the verification of both static and dynamic properties is often needed. The specification of a system is made through modeling languages, while the respective verification is made by its model-checker. Most modeling frameworks are not...

  16. A Quantitative Approach to the Formal Verification of Real-Time Systems.

    Science.gov (United States)

    1996-09-01

    Computer Science A Quantitative Approach to the Formal Verification of Real - Time Systems Sergio Vale Aguiar Campos September 1996 CMU-CS-96-199...ptisiic raieaiSI v Diambimos Lboiamtad _^ A Quantitative Approach to the Formal Verification of Real - Time Systems Sergio Vale Aguiar Campos...implied, of NSF, the Semiconduc- tor Research Corporation, ARPA or the U.S. government. Keywords: real - time systems , formal verification, symbolic

  17. Formal verification of industrial control systems

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    Verification of critical software is a high priority but a challenging task for industrial control systems. For many kinds of problems, testing is not an efficient method. Formal methods, such as model checking appears to be an appropriate complementary method. However, it is not common to use model checking in industry yet, as this method needs typically formal methods expertise and huge computing power. In the EN-ICE-PLC section, we are working on a [methodology][1] and a tool ([PLCverif][2]) to overcome these challenges and to integrate formal verification in the development process of our PLC-based control systems. [1]: http://cern.ch/project-plc-formalmethods [2]: http://cern.ch/plcverif

  18. Nuclear waste repository ventilation system studies

    International Nuclear Information System (INIS)

    Smith, P.R.; Hensel, E.C.; Leslie, I.H.; Schultheis, T.M.; Walls, J.R.; Gregory, W.S.

    1993-01-01

    Ventilation studies of the Waste Isolation Pilot Plant described in this article were performed by personnel from New Mexico State University in collaboration with Sandia National Laboratories, Los Alamos National Laboratory, and Westinghouse Corporation. The following research tasks were performed: 1) High-efficiency particulate air filters of the type used at the Waste Isolation Pilot Plant were loaded with salt aerosol from the site, 2) Filter resistance as a function of salt mass and flow rate was established for later use in computer simulations, 3) Filter efficiency was measured during the loading tests to establish a relation between efficiency and salt loading, 4) The structural strength of the salt-loaded high-efficiency filters was investigated by subjecting the filters to pressure transients of the types expected from fires, explosions and tornados, 5) Computer codes, obtained from Los Alamos National Laboratory, were used to model the ventilation systems and study their response to accident-induced pressure transients and heat fluxes, 6) Partial verification of the computer simulations was obtained by comparing normal operation of the ventilation systems to predicted normal operation, 7) A feasibility study using model-based control of the ventilation systems was initiated and will be completed during the second year of the project. (author) 12 figs., 16 refs

  19. Integrated data management system for radioactive waste and spent fuel in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Park, Yong Taek [Korea Power Engineering Co., Inc., Yongin (Korea, Republic of)

    2002-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Through the system, the five principles(independence, openness, clearance, efficiency and reliance) of safety regulation can be realized and public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted. By providing reliable information and openness within the international nuclear community can be ensured and efficient support of international agreements among contracting parties can be ensured. By operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management), the system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible for holistic control and reorganization of the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy so as to integrate safe management and unit safe disposal. To meet this objectives, design of the database system structure and the study of input/output data validation and verification methodology was performed during the second phase of this project.

  20. Comparing formal verification approaches of interlocking systems

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth; Nguyen, Hoang Nga; Roggenbach, Markus

    2016-01-01

    these approaches. As a first step towards this, in this paper we suggest a way to compare different formal approaches for verifying designs of route-based interlocking systems and we demonstrate it on modelling and verification approaches developed within the research groups at DTU/Bremen and at Surrey......The verification of railway interlocking systems is a challenging task, and therefore several research groups have suggested to improve this task by using formal methods, but they use different modelling and verification approaches. To advance this research, there is a need to compare....../Swansea. The focus is on designs that are specified by so-called control tables. The paper can serve as a starting point for further comparative studies. The DTU/Bremen research has been funded by the RobustRailS project granted by Innovation Fund Denmark. The Surrey/Swansea research has been funded by the Safe...

  1. Remaining Sites Verification Package for the 128-B-3 Burn Pit Site, Waste Site Reclassification Form 2006-058

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-11-17

    The 128-B-3 waste site is a former burn and disposal site for the 100-B/C Area, located adjacent to the Columbia River. The 128-B-3 waste site has been remediated to meet the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results of sampling at upland areas of the site also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  2. Integrated knowledge base tool for acquisition and verification of NPP alarm systems

    International Nuclear Information System (INIS)

    Park, Joo Hyun; Seong, Poong Hyun

    1998-01-01

    Knowledge acquisition and knowledge base verification are important activities in developing knowledge-based systems such as alarm processing systems. In this work, we developed the integrated tool, for knowledge acquisition and verification of NPP alarm processing systems, by using G2 tool. The tool integrates document analysis method and ECPN matrix analysis method, for knowledge acquisition and knowledge verification, respectively. This tool enables knowledge engineers to perform their tasks from knowledge acquisition to knowledge verification consistently

  3. Uncertainty analysis of the SWEPP PAN assay system for glass waste (content codes 440, 441 and 442)

    International Nuclear Information System (INIS)

    Blackwood, L.G.; Harker, Y.D.; Meachum, T.R.; Yoon, W.Y.

    1996-10-01

    INEL is being used as a temporary storage facility for transuranic waste generated by the Nuclear Weapons program at the Rocky Flats Plant. Currently, there is a large effort in progress to prepare to ship this waste to WIPP. In order to meet the TRU Waste Characterization Quality Assurance Program Plan nondestructive assay compliance requirements and quality assurance objectives, it is necessary to determine the total uncertainty of the radioassay results produced by the Stored Waste Examination Pilot Plant (SWEPP) Passive Action Neutron (PAN) radioassay system. This paper discusses a modified statistical sampling and verification approach used to determine the total uncertainty of SWEPP PAN measurements for glass waste (content codes 440, 441, and 442) contained in 208 liter drums. In the modified statistical sampling and verification approach, the total performance of the SWEPP PAN nondestructive assay system for specifically selected waste conditions is simulated using computer models. A set of 100 cases covering the known conditions exhibited in glass waste was compiled using a combined statistical sampling and factorial experimental design approach. Parameter values assigned in each simulation were derived from reviews of approximately 100 real-time radiography video tapes of RFP glass waste drums, results from previous SWEPP PAN measurements on glass waste drums, and shipping data from RFP where the glass waste was generated. The data in the 100 selected cases form the multi-parameter input to the simulation model. The reported plutonium masses from the simulation model are compared with corresponding input masses. From these comparisons, the bias and total uncertainty associated with SWEPP PAN measurements on glass waste drums are estimated. The validity of the simulation approach is verified by comparing simulated output against results from calibration measurements using known plutonium sources and two glass waste calibration drums

  4. Uncertainty analysis of the SWEPP PAN assay system for glass waste (content codes 440, 441 and 442)

    Energy Technology Data Exchange (ETDEWEB)

    Blackwood, L.G.; Harker, Y.D.; Meachum, T.R.; Yoon, W.Y.

    1996-10-01

    INEL is being used as a temporary storage facility for transuranic waste generated by the Nuclear Weapons program at the Rocky Flats Plant. Currently, there is a large effort in progress to prepare to ship this waste to WIPP. In order to meet the TRU Waste Characterization Quality Assurance Program Plan nondestructive assay compliance requirements and quality assurance objectives, it is necessary to determine the total uncertainty of the radioassay results produced by the Stored Waste Examination Pilot Plant (SWEPP) Passive Action Neutron (PAN) radioassay system. This paper discusses a modified statistical sampling and verification approach used to determine the total uncertainty of SWEPP PAN measurements for glass waste (content codes 440, 441, and 442) contained in 208 liter drums. In the modified statistical sampling and verification approach, the total performance of the SWEPP PAN nondestructive assay system for specifically selected waste conditions is simulated using computer models. A set of 100 cases covering the known conditions exhibited in glass waste was compiled using a combined statistical sampling and factorial experimental design approach. Parameter values assigned in each simulation were derived from reviews of approximately 100 real-time radiography video tapes of RFP glass waste drums, results from previous SWEPP PAN measurements on glass waste drums, and shipping data from RFP where the glass waste was generated. The data in the 100 selected cases form the multi-parameter input to the simulation model. The reported plutonium masses from the simulation model are compared with corresponding input masses. From these comparisons, the bias and total uncertainty associated with SWEPP PAN measurements on glass waste drums are estimated. The validity of the simulation approach is verified by comparing simulated output against results from calibration measurements using known plutonium sources and two glass waste calibration drums.

  5. Specification and Verification of Hybrid System

    International Nuclear Information System (INIS)

    Widjaja, Belawati H.

    1997-01-01

    Hybrid systems are reactive systems which intermix between two components, discrete components and continuous components. The continuous components are usually called plants, subject to disturbances which cause the state variables of the systems changing continuously by physical laws and/or by the control laws. The discrete components can be digital computers, sensor and actuators controlled by programs. These programs are designed to select, control and supervise the behavior of the continuous components. Specification and verification of hybrid systems has recently become an active area of research in both computer science and control engineering, many papers concerning hybrid system have been published. This paper gives a design methodology for hybrid systems as an example to the specification and verification of hybrid systems. The design methodology is based on the cooperation between two disciplines, control engineering and computer science. The methodology brings into the design of control loops and decision loops. The external behavior of control loops are specified in a notation which is understandable by the two disciplines. The design of control loops which employed theory of differential equation is done by control engineers, and its correctness is also guaranteed analytically or experimentally by control engineers. The decision loops are designed in computing science based on the specifications of control loops. The verification of systems requirements can be done by computing scientists using a formal reasoning mechanism. For illustrating the proposed design, a problem of balancing an inverted pendulum which is a popular experiment device in control theory is considered, and the Mean Value Calculus is chosen as a formal notation for specifying the control loops and designing the decision loops

  6. Gamma radiation scanning of nuclear waste storage tile holes

    International Nuclear Information System (INIS)

    Das, A.; Yue, S.; Sur, B.; Johnston, J.; Gaudet, M.; Wright, M.; Burton, N.

    2010-01-01

    Nuclear waste management facilities at Chalk River Laboratories use below-ground 'tile holes' to store solid waste from various activities such as medical radioisotope production. A silicon PIN (p-type-intrinsic-n-type semiconductor) diode based gamma radiation scanning system has been developed and used to profile the gamma radiation fields along the depth of waste storage tile holes by deploying the sensor into verification tubes adjacent to the tile holes themselves. The radiation field measurements were consistent with expected radiation fields in the tile holes based on administrative knowledge of the radioactive contents and their corresponding decay rates. Such measurements allow non-invasive verification of tile hole contents and provide input to the assessment of radiological risk associated with removal of the waste. Using this detector system, radioactive waste that has decayed to very low levels may be identified based on the radiation profile. This information will support planning for possible transfer of this waste to a licensed waste storage facility designed for low level waste, thus freeing storage space for possible tile hole re-use for more highly radioactive waste. (author)

  7. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  8. Verification and Validation Issues in Systems of Systems

    Directory of Open Access Journals (Sweden)

    Eric Honour

    2013-11-01

    Full Text Available The cutting edge in systems development today is in the area of "systems of systems" (SoS large networks of inter-related systems that are developed and managed separately, but that also perform collective activities. Such large systems typically involve constituent systems operating with different life cycles, often with uncoordinated evolution. The result is an ever-changing SoS in which adaptation and evolution replace the older engineering paradigm of "development". This short paper presents key thoughts about verification and validation in this environment. Classic verification and validation methods rely on having (a a basis of proof, in requirements and in operational scenarios, and (b a known system configuration to be proven. However, with constant SoS evolution, management of both requirements and system configurations are problematic. Often, it is impossible to maintain a valid set of requirements for the SoS due to the ongoing changes in the constituent systems. Frequently, it is even difficult to maintain a vision of the SoS operational use as users find new ways to adapt the SoS. These features of the SoS result in significant challenges for system proof. In addition to discussing the issues, the paper also indicates some of the solutions that are currently used to prove the SoS.

  9. Remaining Sites Verification Package for the 600-243 Petroleum-Contaminated Soil Bioremediation Pad. Attachment to Waste Site Reclassification Form 2007-033

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 600-243 waste site consisted of a bioremediation pad for petroleum-contaminated soils resulting from the 1100 Area Underground Storage Tank (UST) upgrades in 1994. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  10. Remaining Sites Verification Package for the 100-F-26:13, 108-F Drain Pipelines. Attchment to Waste Site Reclassification Form 2005-011

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2008-01-01

    The 100-F-26:13 waste site is the network of process sewer pipelines that received effluent from the 108-F Biological Laboratory and discharged it to the 188-F Ash Disposal Area (126-F-1 waste site). The pipelines included one 0.15-m (6-in.)-, two 0.2-m (8-in.)-, and one 0.31-m (12-in.)-diameter vitrified clay pipe segments encased in concrete. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  11. Remaining Sites Verification Package for the 128-F-2, 100-F Burning Pit Waste Site. Attachment to Waste Site Reclassification Form 2008-031

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 128-F-2 waste site consisted of multiple burn and debris filled pits located directly east of the 107-F Retention Basin and approximately 30.5 m east of the northeast corner of the 100-F Area perimeter road that runs along the riverbank. The burn pits were used for incinerating nonradioactive, combustible materials from 1945 to 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  12. Engineering drawing field verification program. Revision 3

    International Nuclear Information System (INIS)

    Ulk, P.F.

    1994-01-01

    Safe, efficient operation of waste tank farm facilities is dependent in part upon the availability of accurate, up-to-date plant drawings. Accurate plant drawings are also required in support of facility upgrades and future engineering remediation projects. This supporting document establishes the procedure for performing a visual field verification of engineering drawings, the degree of visual observation being performed and documenting the results. A copy of the drawing attesting to the degree of visual observation will be paginated into the released Engineering Change Notice (ECN) documenting the field verification for future retrieval and reference. All waste tank farm essential and support drawings within the scope of this program will be converted from manual to computer aided drafting (CAD) drawings. A permanent reference to the field verification status will be placed along the right border of the CAD-converted drawing, referencing the revision level, at which the visual verification was performed and documented

  13. Functional verification of dynamically reconfigurable FPGA-based systems

    CERN Document Server

    Gong, Lingkan

    2015-01-01

    This book analyzes the challenges in verifying Dynamically Reconfigurable Systems (DRS) with respect to the user design and the physical implementation of such systems. The authors describe the use of a simulation-only layer to emulate the behavior of target FPGAs and accurately model the characteristic features of reconfiguration. Readers are enabled with this simulation-only layer to maintain verification productivity by abstracting away the physical details of the FPGA fabric.  Two implementations of the simulation-only layer are included: Extended ReChannel is a SystemC library that can be used to check DRS designs at a high level; ReSim is a library to support RTL simulation of a DRS reconfiguring both its logic and state. Through a number of case studies, the authors demonstrate how their approach integrates seamlessly with existing, mainstream DRS design flows and with well-established verification methodologies such as top-down modeling and coverage-driven verification. Provides researchers with an i...

  14. SWEPP PAN assay system uncertainty analysis: Passive mode measurements of graphite waste

    International Nuclear Information System (INIS)

    Blackwood, L.G.; Harker, Y.D.; Meachum, T.R.; Yoon, Woo Y.

    1997-07-01

    The Idaho National Engineering and Environmental Laboratory is being used as a temporary storage facility for transuranic waste generated by the U.S. Nuclear Weapons program at the Rocky Flats Plant (RFP) in Golden, Colorado. Currently, there is a large effort in progress to prepare to ship this waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. In order to meet the TRU Waste Characterization Quality Assurance Program Plan nondestructive assay compliance requirements and quality assurance objectives, it is necessary to determine the total uncertainty of the radioassay results produced by the Stored Waste Examination Pilot Plant (SWEPP) Passive Active Neutron (PAN) radioassay system. To this end a modified statistical sampling and verification approach has been developed to determine the total uncertainty of a PAN measurement. In this approach the total performance of the PAN nondestructive assay system is simulated using computer models of the assay system and the resultant output is compared with the known input to assess the total uncertainty. This paper is one of a series of reports quantifying the results of the uncertainty analysis of the PAN system measurements for specific waste types and measurement modes. In particular this report covers passive mode measurements of weapons grade plutonium-contaminated graphite molds contained in 208 liter drums (waste code 300). The validity of the simulation approach is verified by comparing simulated output against results from measurements using known plutonium sources and a surrogate graphite waste form drum. For actual graphite waste form conditions, a set of 50 cases covering a statistical sampling of the conditions exhibited in graphite wastes was compiled using a Latin hypercube statistical sampling approach

  15. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  16. Acceptance and tracking of waste packages from nuclear power plants at the Centre de l'Aube

    International Nuclear Information System (INIS)

    Errera, J.; Tison, J.L.

    2001-01-01

    For 30 years, the French National Agency for Radioactive Waste Management (ANDRA) is in charge of the radioactive waste management and acquired a good knowledge relating to the control of low and intermediate level waste produced by nuclear power plants (NPP), the waste characteristics and the waste conditioning. The integrated waste management system for low-level radioactive waste in France implemented by ANDRA covers all stages from waste generation to final disposal at the Centre de I'Aube near surface facility. ANDRA defined a quality assurance program for waste management that specifies the level of quality to be achieved by solidification and packaging processes, defines quality control requirements and defines waste tracking requirements, from waste generation through final disposal. Verification of quality of waste packages is implemented at three levels of the waste management system. The first one consists of inspections of waste packages at the generator's premises and audits of the quality assurance organization of the waste generator. The second level of verification consists of the waste tracking system. It allows identifying and tracking each waste package from the step it is fabricated to its final disposal at the ANDRA site. The third level of verification is obtained by mean of non-destructive and destructive assays of waste packages. These assays allow to verify generator compliance with ANDRA's technical specifications and to investigate the accuracy of physical and radioactive characteristics reported to ANDRA by the generator. (author)

  17. Verification test report on a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Information is provided on the development, qualification and acceptance verification of commercial solar heating and hot water systems and components. The verification includes the performances, the efficiences and the various methods used, such as similarity, analysis, inspection, test, etc., that are applicable to satisfying the verification requirements.

  18. Automatic Verification of Timing Constraints for Safety Critical Space Systems

    Science.gov (United States)

    Fernandez, Javier; Parra, Pablo; Sanchez Prieto, Sebastian; Polo, Oscar; Bernat, Guillem

    2015-09-01

    In this paper is presented an automatic process of verification. We focus in the verification of scheduling analysis parameter. This proposal is part of process based on Model Driven Engineering to automate a Verification and Validation process of the software on board of satellites. This process is implemented in a software control unit of the energy particle detector which is payload of Solar Orbiter mission. From the design model is generated a scheduling analysis model and its verification model. The verification as defined as constraints in way of Finite Timed Automatas. When the system is deployed on target the verification evidence is extracted as instrumented points. The constraints are fed with the evidence, if any of the constraints is not satisfied for the on target evidence the scheduling analysis is not valid.

  19. 76 FR 72311 - Hazardous Waste Management System; Identification and Listing of Hazardous Waste; Final Exclusion

    Science.gov (United States)

    2011-11-23

    ..., subject to certain continued verification and monitoring conditions; and (2) to use the Delisting Risk... wastes, EPA has already made the determination based on lengthy and thorough LDR rulemakings that... ash. Response 8. The Delisting Program and the LDR program serve different purposes and because they...

  20. Secure stand alone positive personnel identity verification system (SSA-PPIV)

    International Nuclear Information System (INIS)

    Merillat, P.D.

    1979-03-01

    The properties of a secure stand-alone positive personnel identity verification system are detailed. The system is designed to operate without the aid of a central computing facility and the verification function is performed in the absence of security personnel. Security is primarily achieved by means of data encryption on a magnetic stripe badge. Several operational configurations are discussed. Advantages and disadvantages of this system compared to a central computer driven system are detailed

  1. Towards Verification of Constituent Systems through Automated Proof

    DEFF Research Database (Denmark)

    Couto, Luis Diogo Monteiro Duarte; Foster, Simon; Payne, R

    2014-01-01

    This paper explores verification of constituent systems within the context of the Symphony tool platform for Systems of Systems (SoS). Our SoS modelling language, CML, supports various contractual specification elements, such as state invariants and operation preconditions, which can be used...... to specify contractual obligations on the constituent systems of a SoS. To support verification of these obligations we have developed a proof obligation generator and theorem prover plugin for Symphony. The latter uses the Isabelle/HOL theorem prover to automatically discharge the proof obligations arising...... from a CML model. Our hope is that the resulting proofs can then be used to formally verify the conformance of each constituent system, which is turn would result in a dependable SoS....

  2. Remaining Sites Verification Package for the 100-F-26:15 Miscellaneous Pipelines Associated with the 132-F-6, 1608-F Waste Water Pumping Station. Attachment to Waste Site Reclassification Form 2007-031

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2008-01-01

    The 100-F-26:15 waste site consisted of the remnant portions of underground process effluent and floor drain pipelines that originated at the 105-F Reactor. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  3. Dense time discretization technique for verification of real time systems

    International Nuclear Information System (INIS)

    Makackas, Dalius; Miseviciene, Regina

    2016-01-01

    Verifying the real-time system there are two different models to control the time: discrete and dense time based models. This paper argues a novel verification technique, which calculates discrete time intervals from dense time in order to create all the system states that can be reached from the initial system state. The technique is designed for real-time systems specified by a piece-linear aggregate approach. Key words: real-time system, dense time, verification, model checking, piece-linear aggregate

  4. Formal development and verification of a distributed railway control system

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth; Peleska, J.

    2000-01-01

    specifications which are transformed into directly implementable distributed control processes by applying a series of refinement and verification steps. Concrete safety requirements are derived from an abstract version that can be easily validated with respect to soundness and completeness. Complexity......The authors introduce the concept for a distributed railway control system and present the specification and verification of the main algorithm used for safe distributed control. Our design and verification approach is based on the RAISE method, starting with highly abstract algebraic...... is further reduced by separating the system model into a domain model and a controller model. The domain model describes the physical system in absence of control and the controller model introduces the safety-related control mechanisms as a separate entity monitoring observables of the physical system...

  5. Verification and validation of computer based systems for PFBR

    International Nuclear Information System (INIS)

    Thirugnanamurthy, D.

    2017-01-01

    Verification and Validation (V and V) process is essential to build quality into system. Verification is the process of evaluating a system to determine whether the products of each development phase satisfies the requirements imposed by the previous phase. Validation is the process of evaluating a system at the end of the development process to ensure compliance with the functional, performance and interface requirements. This presentation elaborates the V and V process followed, documents submission requirements in each stage, V and V activities, check list used for reviews in each stage and reports

  6. Verification and validation of predictive computer programs describing the near and far-field chemistry of radioactive waste disposal systems

    International Nuclear Information System (INIS)

    Read, D.; Broyd, T.W.

    1988-01-01

    This paper provides an introduction to CHEMVAL, an international project concerned with establishing the applicability of chemical speciation and coupled transport models to the simulation of realistic waste disposal situations. The project aims to validate computer-based models quantitatively by comparison with laboratory and field experiments. Verification of the various computer programs employed by research organisations within the European Community is ensured through close inter-laboratory collaboration. The compilation and review of thermodynamic data forms an essential aspect of this work and has led to the production of an internally consistent standard CHEMVAL database. The sensitivity of results to variation in fundamental constants is being monitored at each stage of the project and, where feasible, complementary laboratory studies are used to improve the data set. Currently, thirteen organisations from five countries are participating in CHEMVAL which forms part of the Commission of European Communities' MIRAGE 2 programme of research. (orig.)

  7. Verification and Validation for Flight-Critical Systems (VVFCS)

    Science.gov (United States)

    Graves, Sharon S.; Jacobsen, Robert A.

    2010-01-01

    On March 31, 2009 a Request for Information (RFI) was issued by NASA s Aviation Safety Program to gather input on the subject of Verification and Validation (V & V) of Flight-Critical Systems. The responses were provided to NASA on or before April 24, 2009. The RFI asked for comments in three topic areas: Modeling and Validation of New Concepts for Vehicles and Operations; Verification of Complex Integrated and Distributed Systems; and Software Safety Assurance. There were a total of 34 responses to the RFI, representing a cross-section of academic (26%), small & large industry (47%) and government agency (27%).

  8. Verification of Triple Modular Redundancy (TMR) Insertion for Reliable and Trusted Systems

    Science.gov (United States)

    Berg, Melanie; LaBel, Kenneth A.

    2016-01-01

    We propose a method for TMR insertion verification that satisfies the process for reliable and trusted systems. If a system is expected to be protected using TMR, improper insertion can jeopardize the reliability and security of the system. Due to the complexity of the verification process, there are currently no available techniques that can provide complete and reliable confirmation of TMR insertion. This manuscript addresses the challenge of confirming that TMR has been inserted without corruption of functionality and with correct application of the expected TMR topology. The proposed verification method combines the usage of existing formal analysis tools with a novel search-detect-and-verify tool. Field programmable gate array (FPGA),Triple Modular Redundancy (TMR),Verification, Trust, Reliability,

  9. Compositional Verification of Multi-Station Interlocking Systems

    DEFF Research Database (Denmark)

    Macedo, Hugo Daniel dos Santos; Fantechi, Alessandro; Haxthausen, Anne Elisabeth

    2016-01-01

    pose a big challenge to current verification methodologies, due to the explosion of state space size as soon as large, if not medium sized, multi-station systems have to be controlled. For these reasons, verification techniques that exploit locality principles related to the topological layout...... of the controlled system to split in different ways the state space have been investigated. In particular, compositional approaches divide the controlled track network in regions that can be verified separately, once proper assumptions are considered on the way the pieces are glued together. Basing on a successful...... method to verify the size of rather large networks, we propose a compositional approach that is particularly suitable to address multi-station interlocking systems which control a whole line composed of stations linked by mainline tracks. Indeed, it turns out that for such networks, and for the adopted...

  10. Development of requirements tracking and verification system for the software design of distributed control system

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Chul Hwan; Kim, Jang Yeol; Kim, Jung Tack; Lee, Jang Soo; Ham, Chang Shik [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-12-31

    In this paper a prototype of Requirement Tracking and Verification System(RTVS) for a Distributed Control System was implemented and tested. The RTVS is a software design and verification tool. The main functions required by the RTVS are managing, tracking and verification of the software requirements listed in the documentation of the DCS. The analysis of DCS software design procedures and interfaces with documents were performed to define the user of the RTVS, and the design requirements for RTVS were developed. 4 refs., 3 figs. (Author)

  11. Development of requirements tracking and verification system for the software design of distributed control system

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Chul Hwan; Kim, Jang Yeol; Kim, Jung Tack; Lee, Jang Soo; Ham, Chang Shik [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    In this paper a prototype of Requirement Tracking and Verification System(RTVS) for a Distributed Control System was implemented and tested. The RTVS is a software design and verification tool. The main functions required by the RTVS are managing, tracking and verification of the software requirements listed in the documentation of the DCS. The analysis of DCS software design procedures and interfaces with documents were performed to define the user of the RTVS, and the design requirements for RTVS were developed. 4 refs., 3 figs. (Author)

  12. Programmable electronic system design & verification utilizing DFM

    NARCIS (Netherlands)

    Houtermans, M.J.M.; Apostolakis, G.E.; Brombacher, A.C.; Karydas, D.M.

    2000-01-01

    The objective of this paper is to demonstrate the use of the Dynamic Flowgraph Methodology (DIM) during the design and verification of programmable electronic safety-related systems. The safety system consists of hardware as well as software. This paper explains and demonstrates the use of DIM to

  13. IDEF method for designing seismic information system in CTBT verification

    International Nuclear Information System (INIS)

    Zheng Xuefeng; Shen Junyi; Jin Ping; Zhang Huimin; Zheng Jiangling; Sun Peng

    2004-01-01

    Seismic information system is of great importance for improving the capability of CTBT verification. A large amount of money has been appropriated for the research in this field in the U.S. and some other countries in recent years. However, designing and developing a seismic information system involves various technologies about complex system design. This paper discusses the IDEF0 method to construct function models and the IDEF1x method to make information models systemically, as well as how they are used in designing seismic information system in CTBT verification. (authors)

  14. Formal Development and Verification of a Distributed Railway Control System

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth; Peleska, Jan

    1999-01-01

    In this article we introduce the concept for a distributed railway control system and present the specification and verification of the main algorithm used for safe distributed control. Our design and verification approach is based on the RAISE method, starting with highly abstract algebraic...

  15. Formal Development and Verification of a Distributed Railway Control System

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth; Peleska, Jan

    1998-01-01

    In this article we introduce the concept for a distributed railway control system and present the specification and verification of the main algorithm used for safe distributed control. Our design and verification approach is based on the RAISE method, starting with highly abstract algebraic spec...

  16. Automated box/drum waste assay (252Cf shuffler) through the material access and accountability boundary

    International Nuclear Information System (INIS)

    Horley, E.C.; Bjork, C.W.; Bourret, S.C.; Polk, P.J.; Schneider, C.J.; Studley, R.V.

    1992-01-01

    For the first time, a shuffler waste-assay system has been made a part of material access and accountability boundary (MAAB). A 252 Cf Pass-Thru shuffler integrated with a conveyor handling system, will process box or drum waste across the MAAB. This automated system will significantly reduce personnel operating costs because security forces will not be required at the MAAB during waste transfer. Further, the system eliminates the chance of a mix-up between measured and nonmeasured waste. This Pass-Thru shuffler is to be installed in the Westinghouse Savannah River Company 321M facility to screen waste boxes and drums for 235 U. An automated conveyor will load waste containers into the shuffler, and upon verification, will transfer the containers across the MAAB. Verification will consist of a weight measurement followed by active neutron interrogation. Containers that pass low-level waste criteria will be conveyed to an accumulator section outside the MAAB. If a container fails to meet the waste criteria, it will be rejected and sent back to the load station for manual inspection and repackaging

  17. Formal Verification of Quasi-Synchronous Systems

    Science.gov (United States)

    2015-07-01

    pg. 215-226, Springer-Verlag: London, UK, 2001. [4] Nicolas Halbwachs and Louis Mandel, Simulation and Verification of Asynchronous Systems by...Huang, S. A. Smolka, W. Tan , and S. Tripakis, Deep Random Search for Efficient Model Checking of Timed Automata, in Proceedings of the 13th Monterey

  18. Verification and validation guidelines for high integrity systems. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Hecht, H.; Hecht, M.; Dinsmore, G.; Hecht, S.; Tang, D. [SoHaR, Inc., Beverly Hills, CA (United States)

    1995-03-01

    High integrity systems include all protective (safety and mitigation) systems for nuclear power plants, and also systems for which comparable reliability requirements exist in other fields, such as in the process industries, in air traffic control, and in patient monitoring and other medical systems. Verification aims at determining that each stage in the software development completely and correctly implements requirements that were established in a preceding phase, while validation determines that the overall performance of a computer system completely and correctly meets system requirements. Volume I of the report reviews existing classifications for high integrity systems and for the types of errors that may be encountered, and makes recommendations for verification and validation procedures, based on assumptions about the environment in which these procedures will be conducted. The final chapter of Volume I deals with a framework for standards in this field. Volume II contains appendices dealing with specific methodologies for system classification, for dependability evaluation, and for two software tools that can automate otherwise very labor intensive verification and validation activities.

  19. Verification and validation guidelines for high integrity systems. Volume 1

    International Nuclear Information System (INIS)

    Hecht, H.; Hecht, M.; Dinsmore, G.; Hecht, S.; Tang, D.

    1995-03-01

    High integrity systems include all protective (safety and mitigation) systems for nuclear power plants, and also systems for which comparable reliability requirements exist in other fields, such as in the process industries, in air traffic control, and in patient monitoring and other medical systems. Verification aims at determining that each stage in the software development completely and correctly implements requirements that were established in a preceding phase, while validation determines that the overall performance of a computer system completely and correctly meets system requirements. Volume I of the report reviews existing classifications for high integrity systems and for the types of errors that may be encountered, and makes recommendations for verification and validation procedures, based on assumptions about the environment in which these procedures will be conducted. The final chapter of Volume I deals with a framework for standards in this field. Volume II contains appendices dealing with specific methodologies for system classification, for dependability evaluation, and for two software tools that can automate otherwise very labor intensive verification and validation activities

  20. Systems Approach to Arms Control Verification

    Energy Technology Data Exchange (ETDEWEB)

    Allen, K; Neimeyer, I; Listner, C; Stein, G; Chen, C; Dreicer, M

    2015-05-15

    Using the decades of experience of developing concepts and technologies for verifying bilateral and multilateral arms control agreements, a broad conceptual systems approach is being developed that takes into account varying levels of information and risk. The IAEA has already demonstrated the applicability of a systems approach by implementing safeguards at the State level, with acquisition path analysis as the key element. In order to test whether such an approach could also be implemented for arms control verification, an exercise was conducted in November 2014 at the JRC ITU Ispra. Based on the scenario of a hypothetical treaty between two model nuclear weapons states aimed at capping their nuclear arsenals at existing levels, the goal of this exercise was to explore how to use acquisition path analysis in an arms control context. Our contribution will present the scenario, objectives and results of this exercise, and attempt to define future workshops aimed at further developing verification measures that will deter or detect treaty violations.

  1. Formal verification of automated teller machine systems using SPIN

    Science.gov (United States)

    Iqbal, Ikhwan Mohammad; Adzkiya, Dieky; Mukhlash, Imam

    2017-08-01

    Formal verification is a technique for ensuring the correctness of systems. This work focuses on verifying a model of the Automated Teller Machine (ATM) system against some specifications. We construct the model as a state transition diagram that is suitable for verification. The specifications are expressed as Linear Temporal Logic (LTL) formulas. We use Simple Promela Interpreter (SPIN) model checker to check whether the model satisfies the formula. This model checker accepts models written in Process Meta Language (PROMELA), and its specifications are specified in LTL formulas.

  2. MESA: Message-Based System Analysis Using Runtime Verification

    Science.gov (United States)

    Shafiei, Nastaran; Tkachuk, Oksana; Mehlitz, Peter

    2017-01-01

    In this paper, we present a novel approach and framework for run-time verication of large, safety critical messaging systems. This work was motivated by verifying the System Wide Information Management (SWIM) project of the Federal Aviation Administration (FAA). SWIM provides live air traffic, site and weather data streams for the whole National Airspace System (NAS), which can easily amount to several hundred messages per second. Such safety critical systems cannot be instrumented, therefore, verification and monitoring has to happen using a nonintrusive approach, by connecting to a variety of network interfaces. Due to a large number of potential properties to check, the verification framework needs to support efficient formulation of properties with a suitable Domain Specific Language (DSL). Our approach is to utilize a distributed system that is geared towards connectivity and scalability and interface it at the message queue level to a powerful verification engine. We implemented our approach in the tool called MESA: Message-Based System Analysis, which leverages the open source projects RACE (Runtime for Airspace Concept Evaluation) and TraceContract. RACE is a platform for instantiating and running highly concurrent and distributed systems and enables connectivity to SWIM and scalability. TraceContract is a runtime verication tool that allows for checking traces against properties specified in a powerful DSL. We applied our approach to verify a SWIM service against several requirements.We found errors such as duplicate and out-of-order messages.

  3. Practical experience with a local verification system for containment and surveillance sensors

    International Nuclear Information System (INIS)

    Lauppe, W.D.; Richter, B.; Stein, G.

    1984-01-01

    With the growing number of nuclear facilities and a number of large commercial bulk handling facilities steadily coming into operation the International Atomic Energy Agency is faced with increasing requirements as to reducing its inspection efforts. One means of meeting these requirements will be to deploy facility based remote interrogation methods for its containment and surveillance instrumentation. Such a technical concept of remote interrogation was realized through the so-called LOVER system development, a local verification system for electronic safeguards seal systems. In the present investigations the application was extended to radiation monitoring by introducing an electronic interface between the electronic safeguards seal and the neutron detector electronics of a waste monitoring system. The paper discusses the safeguards motivation and background, the experimental setup of the safeguards system and the performance characteristics of this LOVER system. First conclusions can be drawn from the performance results with respect to the applicability in international safeguards. This comprises in particular the definition of design specifications for an integrated remote interrogation system for various types of containment and surveillance instruments and the specifications of safeguards applications employing such a system

  4. Cleanup Verification Package for the 618-2 Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    W. S. Thompson

    2006-12-28

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities.

  5. Cleanup Verification Package for the 618-2 Burial Ground

    International Nuclear Information System (INIS)

    Thompson, W.S.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities

  6. Wu’s Characteristic Set Method for SystemVerilog Assertions Verification

    Directory of Open Access Journals (Sweden)

    Xinyan Gao

    2013-01-01

    Full Text Available We propose a verification solution based on characteristic set of Wu’s method towards SystemVerilog assertion checking over digital circuit systems. We define a suitable subset of SVAs so that an efficient polynomial modeling mechanism for both circuit descriptions and assertions can be applied. We present an algorithm framework based on the algebraic representations using characteristic set of polynomial system. This symbolic algebraic approach is a useful supplement to the existent verification methods based on simulation.

  7. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  8. Methods for verifying compliance with low-level radioactive waste acceptance criteria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-01

    This report summarizes the methods that are currently employed and those that can be used to verify compliance with low-level radioactive waste (LLW) disposal facility waste acceptance criteria (WAC). This report presents the applicable regulations representing the Federal, State, and site-specific criteria for accepting LLW. Typical LLW generators are summarized, along with descriptions of their waste streams and final waste forms. General procedures and methods used by the LLW generators to verify compliance with the disposal facility WAC are presented. The report was written to provide an understanding of how a regulator could verify compliance with a LLW disposal facility`s WAC. A comprehensive study of the methodology used to verify waste generator compliance with the disposal facility WAC is presented in this report. The study involved compiling the relevant regulations to define the WAC, reviewing regulatory agency inspection programs, and summarizing waste verification technology and equipment. The results of the study indicate that waste generators conduct verification programs that include packaging, classification, characterization, and stabilization elements. The current LLW disposal facilities perform waste verification steps on incoming shipments. A model inspection and verification program, which includes an emphasis on the generator`s waste application documentation of their waste verification program, is recommended. The disposal facility verification procedures primarily involve the use of portable radiological survey instrumentation. The actual verification of generator compliance to the LLW disposal facility WAC is performed through a combination of incoming shipment checks and generator site audits.

  9. Methods for verifying compliance with low-level radioactive waste acceptance criteria

    International Nuclear Information System (INIS)

    1993-09-01

    This report summarizes the methods that are currently employed and those that can be used to verify compliance with low-level radioactive waste (LLW) disposal facility waste acceptance criteria (WAC). This report presents the applicable regulations representing the Federal, State, and site-specific criteria for accepting LLW. Typical LLW generators are summarized, along with descriptions of their waste streams and final waste forms. General procedures and methods used by the LLW generators to verify compliance with the disposal facility WAC are presented. The report was written to provide an understanding of how a regulator could verify compliance with a LLW disposal facility's WAC. A comprehensive study of the methodology used to verify waste generator compliance with the disposal facility WAC is presented in this report. The study involved compiling the relevant regulations to define the WAC, reviewing regulatory agency inspection programs, and summarizing waste verification technology and equipment. The results of the study indicate that waste generators conduct verification programs that include packaging, classification, characterization, and stabilization elements. The current LLW disposal facilities perform waste verification steps on incoming shipments. A model inspection and verification program, which includes an emphasis on the generator's waste application documentation of their waste verification program, is recommended. The disposal facility verification procedures primarily involve the use of portable radiological survey instrumentation. The actual verification of generator compliance to the LLW disposal facility WAC is performed through a combination of incoming shipment checks and generator site audits

  10. Verification tests for remote controlled inspection system in nuclear power plants

    International Nuclear Information System (INIS)

    Kohno, Tadaaki

    1986-01-01

    Following the increase of nuclear power plants, the total radiation exposure dose accompanying inspection and maintenance works tended to increase. Japan Power Engineering and Inspection Corp. carried out the verification test of a practical power reactor automatic inspection system from November, 1981, to March, 1986, and in this report, the state of having carried out this verification test is described. The objects of the verification test were the equipment which is urgently required for reducing radiation exposure dose, the possibility of realization of which is high, and which is important for ensuring the safety and reliability of plants, that is, an automatic ultrasonic flaw detector for the welded parts of bend pipes, an automatic disassembling and inspection system for control rod driving mechanism, a fuel automatic inspection system, and automatic decontaminating equipments for steam generator water chambers, primary system crud and radioactive gas in coolant. The results of the verification test of these equipments were judged as satisfactory, therefore, the application to actual plants is possible. (Kako, I.)

  11. Complementary technologies for verification of excess plutonium

    International Nuclear Information System (INIS)

    Langner, D.G.; Nicholas, N.J.; Ensslin, N.; Fearey, B.L.; Mitchell, D.J.; Marlow, K.W.; Luke, S.J.; Gosnell, T.B.

    1998-01-01

    Three complementary measurement technologies have been identified as candidates for use in the verification of excess plutonium of weapons origin. These technologies: high-resolution gamma-ray spectroscopy, neutron multiplicity counting, and low-resolution gamma-ray spectroscopy, are mature, robust technologies. The high-resolution gamma-ray system, Pu-600, uses the 630--670 keV region of the emitted gamma-ray spectrum to determine the ratio of 240 Pu to 239 Pu. It is useful in verifying the presence of plutonium and the presence of weapons-grade plutonium. Neutron multiplicity counting is well suited for verifying that the plutonium is of a safeguardable quantity and is weapons-quality material, as opposed to residue or waste. In addition, multiplicity counting can independently verify the presence of plutonium by virtue of a measured neutron self-multiplication and can detect the presence of non-plutonium neutron sources. The low-resolution gamma-ray spectroscopic technique is a template method that can provide continuity of knowledge that an item that enters the a verification regime remains under the regime. In the initial verification of an item, multiple regions of the measured low-resolution spectrum form a unique, gamma-radiation-based template for the item that can be used for comparison in subsequent verifications. In this paper the authors discuss these technologies as they relate to the different attributes that could be used in a verification regime

  12. Expert system verification and validation for nuclear power industry applications

    International Nuclear Information System (INIS)

    Naser, J.A.

    1990-01-01

    The potential for the use of expert systems in the nuclear power industry is widely recognized. The benefits of such systems include consistency of reasoning during off-normal situations when humans are under great stress, the reduction of times required to perform certain functions, the prevention of equipment failures through predictive diagnostics, and the retention of human expertise in performing specialized functions. The increased use of expert systems brings with it concerns about their reliability. Difficulties arising from software problems can affect plant safety, reliability, and availability. A joint project between EPRI and the US Nuclear Regulatory Commission is being initiated to develop a methodology for verification and validation of expert systems for nuclear power applications. This methodology will be tested on existing and developing expert systems. This effort will explore the applicability of conventional verification and validation methodologies to expert systems. The major area of concern will be certification of the knowledge base. This is expected to require new types of verification and validation techniques. A methodology for developing validation scenarios will also be studied

  13. Cognitive Bias in Systems Verification

    Science.gov (United States)

    Larson, Steve

    2012-01-01

    Working definition of cognitive bias: Patterns by which information is sought and interpreted that can lead to systematic errors in decisions. Cognitive bias is used in diverse fields: Economics, Politics, Intelligence, Marketing, to name a few. Attempts to ground cognitive science in physical characteristics of the cognitive apparatus exceed our knowledge. Studies based on correlations; strict cause and effect is difficult to pinpoint. Effects cited in the paper and discussed here have been replicated many times over, and appear sound. Many biases have been described, but it is still unclear whether they are all distinct. There may only be a handful of fundamental biases, which manifest in various ways. Bias can effect system verification in many ways . Overconfidence -> Questionable decisions to deploy. Availability -> Inability to conceive critical tests. Representativeness -> Overinterpretation of results. Positive Test Strategies -> Confirmation bias. Debiasing at individual level very difficult. The potential effect of bias on the verification process can be managed, but not eliminated. Worth considering at key points in the process.

  14. Verification of Triple Modular Redundancy Insertion for Reliable and Trusted Systems

    Science.gov (United States)

    Berg, Melanie; LaBel, Kenneth

    2016-01-01

    If a system is required to be protected using triple modular redundancy (TMR), improper insertion can jeopardize the reliability and security of the system. Due to the complexity of the verification process and the complexity of digital designs, there are currently no available techniques that can provide complete and reliable confirmation of TMR insertion. We propose a method for TMR insertion verification that satisfies the process for reliable and trusted systems.

  15. The Challenges of Creating a Real-Time Data Management System for TRU-Mixed Waste at the Advanced Mixed Waste Treatment Plant

    International Nuclear Information System (INIS)

    Paff, S. W; Doody, S.

    2003-01-01

    This paper discusses the challenges associated with creating a data management system for waste tracking at the Advanced Mixed Waste Treatment Plant (AMWTP) at the Idaho National Engineering Lab (INEEL). The waste tracking system combines data from plant automation systems and decision points. The primary purpose of the system is to provide information to enable the plant operators and engineers to assess the risks associated with each container and determine the best method of treating it. It is also used to track the transuranic (TRU) waste containers as they move throughout the various processes at the plant. And finally, the goal of the system is to support paperless shipments of the waste to the Waste Isolation Pilot Plant (WIPP). This paper describes the approach, methodologies, the underlying design of the database, and the challenges of creating the Data Management System (DMS) prior to completion of design and construction of a major plant. The system was built utilizing an Oracle database platform, and Oracle Forms 6i in client-server mode. The underlying data architecture is container-centric, with separate tables and objects for each type of analysis used to characterize the waste, including real-time radiography (RTR), non-destructive assay (NDA), head-space gas sampling and analysis (HSGS), visual examination (VE) and coring. The use of separate tables facilitated the construction of automatic interfaces with the analysis instruments that enabled direct data capture. Movements are tracked using a location system describing each waste container's current location and a history table tracking the container's movement history. The movement system is designed to interface both with radio-frequency bar-code devices and the plant's integrated control system (ICS). Collections of containers or information, such as batches, were created across the various types of analyses, which enabled a single, cohesive approach to be developed for verification and

  16. A Cache System Design for CMPs with Built-In Coherence Verification

    Directory of Open Access Journals (Sweden)

    Mamata Dalui

    2016-01-01

    Full Text Available This work reports an effective design of cache system for Chip Multiprocessors (CMPs. It introduces built-in logic for verification of cache coherence in CMPs realizing directory based protocol. It is developed around the cellular automata (CA machine, invented by John von Neumann in the 1950s. A special class of CA referred to as single length cycle 2-attractor cellular automata (TACA has been planted to detect the inconsistencies in cache line states of processors’ private caches. The TACA module captures coherence status of the CMPs’ cache system and memorizes any inconsistent recording of the cache line states during the processors’ reference to a memory block. Theory has been developed to empower a TACA to analyse the cache state updates and then to settle to an attractor state indicating quick decision on a faulty recording of cache line status. The introduction of segmentation of the CMPs’ processor pool ensures a better efficiency, in determining the inconsistencies, by reducing the number of computation steps in the verification logic. The hardware requirement for the verification logic points to the fact that the overhead of proposed coherence verification module is much lesser than that of the conventional verification units and is insignificant with respect to the cost involved in CMPs’ cache system.

  17. ECG Sensor Verification System with Mean-Interval Algorithm for Handling Sport Issue

    Directory of Open Access Journals (Sweden)

    Kuo-Kun Tseng

    2016-01-01

    Full Text Available With the development of biometric verification, we proposed a new algorithm and personal mobile sensor card system for ECG verification. The proposed new mean-interval approach can identify the user quickly with high accuracy and consumes a small amount of flash memory in the microprocessor. The new framework of the mobile card system makes ECG verification become a feasible application to overcome the issues of a centralized database. For a fair and comprehensive evaluation, the experimental results have been tested on public MIT-BIH ECG databases and our circuit system; they confirm that the proposed scheme is able to provide excellent accuracy and low complexity. Moreover, we also proposed a multiple-state solution to handle the heat rate changes of sports problem. It should be the first to address the issue of sports in ECG verification.

  18. The inverse method parametric verification of real-time embedded systems

    CERN Document Server

    André , Etienne

    2013-01-01

    This book introduces state-of-the-art verification techniques for real-time embedded systems, based on the inverse method for parametric timed automata. It reviews popular formalisms for the specification and verification of timed concurrent systems and, in particular, timed automata as well as several extensions such as timed automata equipped with stopwatches, linear hybrid automata and affine hybrid automata.The inverse method is introduced, and its benefits for guaranteeing robustness in real-time systems are shown. Then, it is shown how an iteration of the inverse method can solv

  19. Rule Systems for Runtime Verification: A Short Tutorial

    Science.gov (United States)

    Barringer, Howard; Havelund, Klaus; Rydeheard, David; Groce, Alex

    In this tutorial, we introduce two rule-based systems for on and off-line trace analysis, RuleR and LogScope. RuleR is a conditional rule-based system, which has a simple and easily implemented algorithm for effective runtime verification, and into which one can compile a wide range of temporal logics and other specification formalisms used for runtime verification. Specifications can be parameterized with data, or even with specifications, allowing for temporal logic combinators to be defined. We outline a number of simple syntactic extensions of core RuleR that can lead to further conciseness of specification but still enabling easy and efficient implementation. RuleR is implemented in Java and we will demonstrate its ease of use in monitoring Java programs. LogScope is a derivation of RuleR adding a simple very user-friendly temporal logic. It was developed in Python, specifically for supporting testing of spacecraft flight software for NASA’s next 2011 Mars mission MSL (Mars Science Laboratory). The system has been applied by test engineers to analysis of log files generated by running the flight software. Detailed logging is already part of the system design approach, and hence there is no added instrumentation overhead caused by this approach. While post-mortem log analysis prevents the autonomous reaction to problems possible with traditional runtime verification, it provides a powerful tool for test automation. A new system is being developed that integrates features from both RuleR and LogScope.

  20. Research on key technology of the verification system of steel rule based on vision measurement

    Science.gov (United States)

    Jia, Siyuan; Wang, Zhong; Liu, Changjie; Fu, Luhua; Li, Yiming; Lu, Ruijun

    2018-01-01

    The steel rule plays an important role in quantity transmission. However, the traditional verification method of steel rule based on manual operation and reading brings about low precision and low efficiency. A machine vison based verification system of steel rule is designed referring to JJG1-1999-Verificaiton Regulation of Steel Rule [1]. What differentiates this system is that it uses a new calibration method of pixel equivalent and decontaminates the surface of steel rule. Experiments show that these two methods fully meet the requirements of the verification system. Measuring results strongly prove that these methods not only meet the precision of verification regulation, but also improve the reliability and efficiency of the verification system.

  1. Waste Receiving and Processing Module 2A waste certification strategy

    International Nuclear Information System (INIS)

    LeClair, M.D.; Pottmeyer, J.A.; Hyre, R.A.

    1994-01-01

    This document addresses the certification of Mixed Low Level Waste (MLLW) that will be treated in the Waste Receiving and Processing Facility Module 2A (WRAP 2A) and is destined for disposal in the MLLW trench of the Low Level Burial Grounds (LLBG). The MLLW that will be treated in WRAP 2A contains land disposal restricted and radioactive constituents. Certification of the treated waste is dependent on numerous waste management activities conducted throughout the WRAP 2A operation. These activities range from waste treatability testing conducted prior to WRAP 2A waste acceptance to overchecking final waste form quality prior to transferring waste to disposal. This document addresses the high level strategies and methodologies for certifying the final waste form. Integration among all design and verification activities that support final waste form quality assurance is also discussed. The information generated from this effort may directly support other ongoing activities including the WRAP 2A Waste Characterization Study, WRAP 2A Waste Analysis Plan development, Sample Plan development, and the WRAP 2A Data Management System functional requirements definition

  2. Model Checking - Automated Verification of Computational Systems

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 14; Issue 7. Model Checking - Automated Verification of Computational Systems. Madhavan Mukund. General Article Volume 14 Issue 7 July 2009 pp 667-681. Fulltext. Click here to view fulltext PDF. Permanent link:

  3. Formal Verification of Circuits and Systems

    Indian Academy of Sciences (India)

    R. Narasimhan (Krishtel eMaging) 1461 1996 Oct 15 13:05:22

    The problem of validation and verification of correctness of present day hardware and soft- ware systems has become extemely complex due to the enormous growth in the size of the designs. Today typically 50% to 70% of the design cycle time is spent in verifying correct- ness. While simulation remains a predominant form ...

  4. Nuclear waste management. Quarterly progress report, April-June 1981

    Energy Technology Data Exchange (ETDEWEB)

    Chikalla, T.D.; Powell, J.A.

    1981-09-01

    Reports and summaries are presented for the following: high-level waste process development; alternative waste forms; TMI zeolite vitrification demonstration program; nuclear waste materials characterization center; TRU waste immobilization; TRU waste decontamination; krypton implantation; thermal outgassing; iodine-129 fixation; NWVP off-gas analysis; monitoring and physical characterization of unsaturated zone transport; well-logging instrumentation development; verification instrument development; mobility of organic complexes of radionuclides in soils; handbook of methods to decrease the generation of low-level waste; waste management system studies; waste management safety studies; assessment of effectiveness of geologic isolation systems; waste/rock interactions technology program; high-level waste form preparation; development of backfill materials; development of structural engineered barriers; disposal charge analysis; and analysis of spent fuel policy implementation.

  5. System verification and validation report for the TMAD code

    International Nuclear Information System (INIS)

    Finfrock, S.H.

    1995-01-01

    This document serves as the Verification and Validation Report for the TMAD code system, which includes the TMAD code and the LIBMAKR Code. The TMAD code was commissioned to facilitate the interpretation of moisture probe measurements in the Hanford Site waste tanks. In principle, the code is an interpolation routine that acts over a library of benchmark data based on two independent variables, typically anomaly size and moisture content. Two additional variables, anomaly type and detector type, can also be considered independent variables, but no interpolation is done over them. The dependent variable is detector response. The intent is to provide the code with measured detector responses from two or more detectors. The code will then interrogate (and interpolate upon) the benchmark data library and find the anomaly-type/anomaly-size/moisture-content combination that provides the closest match to the measured data. The primary purpose of this document is to provide the results of the system testing and the conclusions based thereon. The results of the testing process are documented in the body of the report. Appendix A gives the test plan, including test procedures, used in conducting the tests. Appendix B lists the input data required to conduct the tests, and Appendices C and 0 list the numerical results of the tests

  6. TLM.open: a SystemC/TLM Frontend for the CADP Verification Toolbox

    Directory of Open Access Journals (Sweden)

    Claude Helmstetter

    2014-04-01

    Full Text Available SystemC/TLM models, which are C++ programs, allow the simulation of embedded software before hardware low-level descriptions are available and are used as golden models for hardware verification. The verification of the SystemC/TLM models is an important issue since an error in the model can mislead the system designers or reveal an error in the specifications. An open-source simulator for SystemC/TLM is provided but there are no tools for formal verification.In order to apply model checking to a SystemC/TLM model, a semantics for standard C++ code and for specific SystemC/TLM features must be provided. The usual approach relies on the translation of the SystemC/TLM code into a formal language for which a model checker is available.We propose another approach that suppresses the error-prone translation effort. Given a SystemC/TLM program, the transitions are obtained by executing the original code using g++ and an extended SystemC library, and we ask the user to provide additional functions to store the current model state. These additional functions generally represent less than 20% of the size of the original model, and allow it to apply all CADP verification tools to the SystemC/TLM model itself.

  7. Verification of FPGA-based NPP I and C systems. General approach and techniques

    International Nuclear Information System (INIS)

    Andrashov, Anton; Kharchenko, Vyacheslav; Sklyar, Volodymir; Reva, Lubov; Siora, Alexander

    2011-01-01

    This paper presents a general approach and techniques for design and verification of Field Programmable Gates Arrays (FPGA)-based Instrumentation and Control (I and C) systems for Nuclear Power Plants (NPP). Appropriate regulatory documents used for I and C systems design, development, verification and validation (V and V) are discussed considering the latest international standards and guidelines. Typical development and V and V processes of FPGA electronic design for FPGA-based NPP I and C systems are presented. Some safety-related features of implementation process are discussed. Corresponding development artifacts, related to design and implementation activities are outlined. An approach to test-based verification of FPGA electronic design algorithms, used in FPGA-based reactor trip systems is proposed. The results of application of test-based techniques for assessment of FPGA electronic design algorithms for reactor trip system (RTS) produced by Research and Production Corporation (RPC) 'Radiy' are presented. Some principles of invariant-oriented verification for FPGA-based safety-critical systems are outlined. (author)

  8. Portable system for periodical verification of area monitors for neutrons

    International Nuclear Information System (INIS)

    Souza, Luciane de R.; Leite, Sandro Passos; Lopes, Ricardo Tadeu; Patrao, Karla C. de Souza; Fonseca, Evaldo S. da; Pereira, Walsan W.

    2009-01-01

    The Neutrons Laboratory develops a project viewing the construction of a portable test system for verification of functioning conditions of neutron area monitors. This device will allow to the users the verification of the calibration maintenance of his instruments at the use installations, avoiding the use of an inadequate equipment related to his answer to the neutron beam response

  9. Safety Verification for Probabilistic Hybrid Systems

    Czech Academy of Sciences Publication Activity Database

    Zhang, J.; She, Z.; Ratschan, Stefan; Hermanns, H.; Hahn, E.M.

    2012-01-01

    Roč. 18, č. 6 (2012), s. 572-587 ISSN 0947-3580 R&D Projects: GA MŠk OC10048; GA ČR GC201/08/J020 Institutional research plan: CEZ:AV0Z10300504 Keywords : model checking * hybrid system s * formal verification Subject RIV: IN - Informatics, Computer Science Impact factor: 1.250, year: 2012

  10. Automated Formal Verification for PLC Control Systems

    CERN Multimedia

    Fernández Adiego, Borja

    2014-01-01

    Programmable Logic Controllers (PLCs) are widely used devices used in industrial control systems. Ensuring that the PLC software is compliant with its specification is a challenging task. Formal verification has become a recommended practice to ensure the correctness of the safety-critical software. However, these techniques are still not widely applied in industry due to the complexity of building formal models, which represent the system and the formalization of requirement specifications. We propose a general methodology to perform automated model checking of complex properties expressed in temporal logics (e.g. CTL, LTL) on PLC programs. This methodology is based on an Intermediate Model (IM), meant to transform PLC programs written in any of the languages described in the IEC 61131-3 standard (ST, IL, etc.) to different modeling languages of verification tools. This approach has been applied to CERN PLC programs validating the methodology.

  11. Cognitive Bias in the Verification and Validation of Space Flight Systems

    Science.gov (United States)

    Larson, Steve

    2012-01-01

    Cognitive bias is generally recognized as playing a significant role in virtually all domains of human decision making. Insight into this role is informally built into many of the system engineering practices employed in the aerospace industry. The review process, for example, typically has features that help to counteract the effect of bias. This paper presents a discussion of how commonly recognized biases may affect the verification and validation process. Verifying and validating a system is arguably more challenging than development, both technically and cognitively. Whereas there may be a relatively limited number of options available for the design of a particular aspect of a system, there is a virtually unlimited number of potential verification scenarios that may be explored. The probability of any particular scenario occurring in operations is typically very difficult to estimate, which increases reliance on judgment that may be affected by bias. Implementing a verification activity often presents technical challenges that, if they can be overcome at all, often result in a departure from actual flight conditions (e.g., 1-g testing, simulation, time compression, artificial fault injection) that may raise additional questions about the meaningfulness of the results, and create opportunities for the introduction of additional biases. In addition to mitigating the biases it can introduce directly, the verification and validation process must also overcome the cumulative effect of biases introduced during all previous stages of development. A variety of cognitive biases will be described, with research results for illustration. A handful of case studies will be presented that show how cognitive bias may have affected the verification and validation process on recent JPL flight projects, identify areas of strength and weakness, and identify potential changes or additions to commonly used techniques that could provide a more robust verification and validation of

  12. A hand held photo identity verification system for mobile applications

    International Nuclear Information System (INIS)

    Kumar, Ranajit; Upreti, Anil; Mahaptra, U.; Bhattacharya, S.; Srivastava, G.P.

    2009-01-01

    A handheld portable system has been developed for mobile personnel identity verification. The system consists of a contact less RF smart card reader integrated to a Simputer through serial link. The simputer verifies the card data, with the data base and aids the security operator in identifying the persons by providing the facial image of the verified person along with other personal details like name, designation, division etc. All transactions are recorded in the Simputer with time and date for future record. This system finds extensive applications in mobile identity verification in nuclear or other industries. (author)

  13. MCNP efficiency calculations of INEEL passive active neutron assay system for simulated TRU waste assays

    International Nuclear Information System (INIS)

    Yoon, W.Y.; Meachum, T.R.; Blackwood, L.G.; Harker, Y.D.

    2000-01-01

    The Idaho National Engineering and Environmental Laboratory Stored Waste Examination Pilot Plant (SWEPP) passive active neutron (PAN) radioassay system is used to certify transuranic (TRU) waste drums in terms of quantifying plutonium and other TRU element activities. Depending on the waste form involved, significant systematic and random errors need quantification in addition to the counting statistics. To determine the total uncertainty of the radioassay results, a statistical sampling and verification approach has been developed. In this approach, the total performance of the PAN nondestructive assay system is simulated using the computer models of the assay system, and the resultant output is compared with the known input to assess the total uncertainty. The supporting steps in performing the uncertainty analysis for the passive assay measurements in particular are as follows: (1) Create simulated waste drums and associated conditions; (2) Simulate measurements to determine the basic counting data that would be produced by the PAN assay system under the conditions specified; and (3) Apply the PAN assay system analysis algorithm to the set of counting data produced by simulating measurements to determine the measured plutonium mass. The validity of this simulation approach was verified by comparing simulated output against results from actual measurements using known plutonium sources and surrogate waste drums. The computer simulation of the PAN system performance uses the Monte Carlo N-Particle (MCNP) Code System to produce a neutron transport calculation for a simulated waste drum. Specifically, the passive system uses the neutron coincidence counting technique, utilizing the spontaneous fission of 240 Pu. MCNP application to the SWEPP PAN assay system uncertainty analysis has been very useful for a variety of waste types contained in 208-ell drums measured by a passive radioassay system. The application of MCNP to the active radioassay system is also feasible

  14. Source Code Verification for Embedded Systems using Prolog

    Directory of Open Access Journals (Sweden)

    Frank Flederer

    2017-01-01

    Full Text Available System relevant embedded software needs to be reliable and, therefore, well tested, especially for aerospace systems. A common technique to verify programs is the analysis of their abstract syntax tree (AST. Tree structures can be elegantly analyzed with the logic programming language Prolog. Moreover, Prolog offers further advantages for a thorough analysis: On the one hand, it natively provides versatile options to efficiently process tree or graph data structures. On the other hand, Prolog's non-determinism and backtracking eases tests of different variations of the program flow without big effort. A rule-based approach with Prolog allows to characterize the verification goals in a concise and declarative way. In this paper, we describe our approach to verify the source code of a flash file system with the help of Prolog. The flash file system is written in C++ and has been developed particularly for the use in satellites. We transform a given abstract syntax tree of C++ source code into Prolog facts and derive the call graph and the execution sequence (tree, which then are further tested against verification goals. The different program flow branching due to control structures is derived by backtracking as subtrees of the full execution sequence. Finally, these subtrees are verified in Prolog. We illustrate our approach with a case study, where we search for incorrect applications of semaphores in embedded software using the real-time operating system RODOS. We rely on computation tree logic (CTL and have designed an embedded domain specific language (DSL in Prolog to express the verification goals.

  15. Property-based Code Slicing for Efficient Verification of OSEK/VDX Operating Systems

    Directory of Open Access Journals (Sweden)

    Mingyu Park

    2012-12-01

    Full Text Available Testing is a de-facto verification technique in industry, but insufficient for identifying subtle issues due to its optimistic incompleteness. On the other hand, model checking is a powerful technique that supports comprehensiveness, and is thus suitable for the verification of safety-critical systems. However, it generally requires more knowledge and cost more than testing. This work attempts to take advantage of both techniques to achieve integrated and efficient verification of OSEK/VDX-based automotive operating systems. We propose property-based environment generation and model extraction techniques using static code analysis, which can be applied to both model checking and testing. The technique is automated and applied to an OSEK/VDX-based automotive operating system, Trampoline. Comparative experiments using random testing and model checking for the verification of assertions in the Trampoline kernel code show how our environment generation and abstraction approach can be utilized for efficient fault-detection.

  16. Inspector measurement verification activities

    International Nuclear Information System (INIS)

    George, R.S.; Crouch, R.

    e most difficult and complex activity facing a safeguards inspector involves the verification of measurements and the performance of the measurement system. Remeasurement is the key to measurement verification activities. Remeasurerements using the facility's measurement system provide the bulk of the data needed for determining the performance of the measurement system. Remeasurements by reference laboratories are also important for evaluation of the measurement system and determination of systematic errors. The use of these measurement verification activities in conjunction with accepted inventory verification practices provides a better basis for accepting or rejecting an inventory. (U.S.)

  17. Remaining Sites Verification Package for the 120-B-1, 105-B Battery Acid Sump. Attachment to Waste Site Reclassification Form 2006-057

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 120-B-1 waste site, located in the 100-BC-1 Operable Unit of the Hanford Site, consisted of a concrete battery acid sump that was used from 1944 to 1969 to neutralize the spent sulfuric acid from lead cell batteries of emergency power packs and the emergency lighting system. The battery acid sump was associated with the 105-B Reactor Building and was located adjacent to the building's northwest corner. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  18. CTBT integrated verification system evaluation model supplement

    International Nuclear Information System (INIS)

    EDENBURN, MICHAEL W.; BUNTING, MARCUS; PAYNE, ARTHUR C. JR.; TROST, LAWRENCE C.

    2000-01-01

    Sandia National Laboratories has developed a computer based model called IVSEM (Integrated Verification System Evaluation Model) to estimate the performance of a nuclear detonation monitoring system. The IVSEM project was initiated in June 1994, by Sandia's Monitoring Systems and Technology Center and has been funded by the U.S. Department of Energy's Office of Nonproliferation and National Security (DOE/NN). IVSEM is a simple, ''top-level,'' modeling tool which estimates the performance of a Comprehensive Nuclear Test Ban Treaty (CTBT) monitoring system and can help explore the impact of various sensor system concepts and technology advancements on CTBT monitoring. One of IVSEM's unique features is that it integrates results from the various CTBT sensor technologies (seismic, in sound, radionuclide, and hydroacoustic) and allows the user to investigate synergy among the technologies. Specifically, IVSEM estimates the detection effectiveness (probability of detection), location accuracy, and identification capability of the integrated system and of each technology subsystem individually. The model attempts to accurately estimate the monitoring system's performance at medium interfaces (air-land, air-water) and for some evasive testing methods such as seismic decoupling. The original IVSEM report, CTBT Integrated Verification System Evaluation Model, SAND97-25 18, described version 1.2 of IVSEM. This report describes the changes made to IVSEM version 1.2 and the addition of identification capability estimates that have been incorporated into IVSEM version 2.0

  19. System Description: Embedding Verification into Microsoft Excel

    OpenAIRE

    Collins, Graham; Dennis, Louise Abigail

    2000-01-01

    The aim of the PROSPER project is to allow the embedding of existing verification technology into applications in such a way that the theorem proving is hidden, or presented to the end user in a natural way. This paper describes a system built to test whether the PROSPER toolkit satisfied this aim. The system combines the toolkit with Microsoft Excel, a popular commercial spreadsheet application.

  20. Survey on Offline Finger Print Verification System

    NARCIS (Netherlands)

    Suman, R.; Kaur, R.

    2012-01-01

    The fingerprint verification, means where "verification" implies a user matching a fingerprint against a single fingerprint associated with the identity that the user claims. Biometrics can be classified into two types Behavioral (signature verification, keystroke dynamics, etc.) And Physiological

  1. Remaining Sites Verification Package for the 1607-D4 Septic System. Attachment to Waste Site Reclassification Form 2005-036

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2006-01-01

    The 1607-D4 Septic System was a septic tank and tile field that received sanitary sewage from the 115-D/DR Gas Recirculation Facility. This septic system operated from 1944 to 1968. Decommissioning took place in 1985 and 1986 when all above-grade features were demolished and the tank backfilled. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  2. Remaining Sites Verification Package for the 100-B-18, 184-B Powerhouse Debris Pile. Attachment to Waste Site Reclassification Form 2007-020

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2007-01-01

    The 100-B-18 Powerhouse Debris Pile contained miscellaneous demolition waste from the decommissioning activities of the 184-B Powerhouse. The debris covered an area roughly 15 m by 30 m and included materials such as concrete blocks, mixed aggregate/concrete slabs, stone rubble, asphalt rubble, traces of tar/coal, broken fluorescent lights, brick chimney remnants, and rubber hoses. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  3. Cleanup Verification Package for the 118-F-2 Burial Ground

    International Nuclear Information System (INIS)

    Capron, J.M.; Anselm, K.A.

    2008-01-01

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-2 Burial Ground. This burial ground, formerly called Solid Waste Burial Ground No. 1, was the original solid waste disposal site for the 100-F Area. Eight trenches contained miscellaneous solid waste from the 105-F Reactor and one trench contained solid waste from the biology facilities

  4. Test/QA Plan for Verification of Radio Frequency Identification (RFID) for Tracking Hazardous Waste Shipments across International Borders

    Science.gov (United States)

    The verification test will be conducted under the auspices of the U.S. Environmental Protection Agency (EPA) through the Environmental Technology Verification (ETV) Program. It will be performed by Battelle, which is managing the ETV Advanced Monitoring Systems (AMS) Center throu...

  5. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  6. Remaining Sites Verification Package for the 600-111, P-11 Critical Mass Laboratory Crib, and UPR-600-16, Fire and Contamination Spread Waste Sites. Attachment to Waste Site Reclassification Form 2004-065

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 600-111, P-11 Critical Mass Laboratory Crib waste site, also referred to as the P-11 Facility, included the 120 Experimental Building, the 123 Control Building, and the P-11 Crib. The facility was constructed in 1949 and was used as a laboratory for plutonium criticality studies. In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The results of confirmatory and verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  7. Remaining Sites Verification Package for the 100-B-21:2 Subsite (100-B/C Discovery Pipeline DS-100BC-002). Attachment Waste Site Reclassification Form 2008-003

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 100-B-21:2 waste site consists of the immediate area of the DS-100BC-02 pipeline. In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  8. Automated Image Acquisition System for the Verification of Copper-Brass Seal Images

    International Nuclear Information System (INIS)

    Stringa, E.; Bergonzi, C.; Littmann, F.; ); Marszalek, Y.; Tempesta, S.; )

    2015-01-01

    This paper describes a system for the verification of copper-brass seals realized by JRC according to DG ENER requirements. DG ENER processes about 20,000 metal seals per year. The verification of metal seals consists in visually checking the identity of a removed seal. The identity of a copper-brass seal is defined by a random stain pattern realized by the seal producer together with random scratches engraved when the seals are initialized ('seal production'). In order to verify that the seal returned from the field is the expected one its pattern is compared with an image taken during seal production. Formerly, seal initialization and verification were very heavy tasks as seal pictures were acquired with a camera one by one both in the initialization and verification stages. During the initialization the Nuclear Safeguards technicians had to place one by one new seals under a camera and acquire the related reference images. During the verification, the technician had to take used seals and place them one by one under a camera to take new pictures. The new images were presented to the technicians without any preprocessing and the technicians had to recognize the seal. The new station described in this paper has an automated image acquisition system allowing to easily process seals in batches of 100 seals. To simplify the verification, a software automatically centres and rotates the newly acquired seal image in order to perfectly overlap with the reference image acquired during the production phase. The new system significantly speeds up seal production and helps particularly with the demanding task of seal verification. As a large part of the seals is dealt with by a joint Euratom-IAEA team, the IAEA directly profits from this development. The new tool has been in routine use since mid 2013. (author)

  9. 340 and 310 drawing field verification

    International Nuclear Information System (INIS)

    Langdon, J.

    1996-01-01

    The purpose of the drawing field verification work plan is to provide reliable drawings for the 310 Treated Effluent Disposal Facility (TEDF) and 340 Waste Handling Facility (340 Facility). The initial scope of this work plan is to provide field verified and updated versions of all the 340 Facility essential drawings. This plan can also be used for field verification of any other drawings that the facility management directs to be so updated. Any drawings revised by this work plan will be issued in an AutoCAD format

  10. CTBT integrated verification system evaluation model supplement

    Energy Technology Data Exchange (ETDEWEB)

    EDENBURN,MICHAEL W.; BUNTING,MARCUS; PAYNE JR.,ARTHUR C.; TROST,LAWRENCE C.

    2000-03-02

    Sandia National Laboratories has developed a computer based model called IVSEM (Integrated Verification System Evaluation Model) to estimate the performance of a nuclear detonation monitoring system. The IVSEM project was initiated in June 1994, by Sandia's Monitoring Systems and Technology Center and has been funded by the U.S. Department of Energy's Office of Nonproliferation and National Security (DOE/NN). IVSEM is a simple, ''top-level,'' modeling tool which estimates the performance of a Comprehensive Nuclear Test Ban Treaty (CTBT) monitoring system and can help explore the impact of various sensor system concepts and technology advancements on CTBT monitoring. One of IVSEM's unique features is that it integrates results from the various CTBT sensor technologies (seismic, in sound, radionuclide, and hydroacoustic) and allows the user to investigate synergy among the technologies. Specifically, IVSEM estimates the detection effectiveness (probability of detection), location accuracy, and identification capability of the integrated system and of each technology subsystem individually. The model attempts to accurately estimate the monitoring system's performance at medium interfaces (air-land, air-water) and for some evasive testing methods such as seismic decoupling. The original IVSEM report, CTBT Integrated Verification System Evaluation Model, SAND97-25 18, described version 1.2 of IVSEM. This report describes the changes made to IVSEM version 1.2 and the addition of identification capability estimates that have been incorporated into IVSEM version 2.0.

  11. Waste retrieval sluicing system campaign number 1 solids volume transferred calculation

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 during Waste Retrieval Sluicing System (WRSS) Sluicing Campaign No.1. This calculation will be updated, if necessary, to incorporate new data. This calculation supports the declaration of completion of WRSS Campaign No.1 and, as such, is also the documentation for completion of Performance Agreement TWR 1.2.1 , C-106 Sluicing Performance Expectations. It documents the performance of all the appropriate tank 241-C-106 mass transfer verifications, evaluations, and appropriate adjustments discussed in HNF-SD-WM-PROC-021, Chapter 23, ''Process Engineering Calculations for Tank 241-C-106 Sluicing and Retrieval''

  12. Waste retrieval sluicing system campaign number 1 solids volume transferred calculation

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 during Waste Retrieval Sluicing System (WRSS) Sluicing Campaign No.1. This calculation will be updated, if necessary, to incorporate new data. This calculation supports the declaration of completion of WRSS Campaign No.1 and, as such, is also the documentation for completion of Performance Agreement TWR 1.2.1 C-106 Sluicing Performance Expectations. It documents the performance of all the appropriate tank 241-C-106 mass transfer verifications, evaluations, and appropriate adjustments discussed in HNF-SD-WM-PROC-021, Chapter 23, ''Process Engineering Calculations for Tank 241-C-106 Sluicing and Retrieval''

  13. The verification of neutron activation analysis support system (cooperative research)

    Energy Technology Data Exchange (ETDEWEB)

    Sasajima, Fumio; Ichimura, Shigeju; Ohtomo, Akitoshi; Takayanagi, Masaji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Sawahata, Hiroyuki; Ito, Yasuo [Tokyo Univ. (Japan). Research Center for Nuclear Science and Technology; Onizawa, Kouji [Radiation Application Development Association, Tokai, Ibaraki (Japan)

    2000-12-01

    Neutron activation analysis support system is the system in which even the user who has not much experience in the neutron activation analysis can conveniently and accurately carry out the multi-element analysis of the sample. In this verification test, subjects such functions, usability, precision and accuracy of the analysis and etc. of the neutron activation analysis support system were confirmed. As a method of the verification test, it was carried out using irradiation device, measuring device, automatic sample changer and analyzer equipped in the JRR-3M PN-3 facility, and analysis software KAYZERO/SOLCOI based on the k{sub 0} method. With these equipments, calibration of the germanium detector, measurement of the parameter of the irradiation field and analysis of three kinds of environmental standard sample were carried out. The k{sub 0} method adopted in this system is primarily utilized in Europe recently, and it is the analysis method, which can conveniently and accurately carried out the multi-element analysis of the sample without requiring individual comparison standard sample. By this system, total 28 elements were determined quantitatively, and 16 elements with the value guaranteed as analytical data of the NIST (National Institute of Standards and Technology) environment standard sample were analyzed in the accuracy within 15%. This report describes content and verification result of neutron activation support system. (author)

  14. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    F. Habashi

    2000-06-22

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  15. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Habashi, F.

    2000-01-01

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  16. ECG based biometrics verification system using LabVIEW

    Directory of Open Access Journals (Sweden)

    Sunil Kumar Singla

    2010-07-01

    Full Text Available Biometric based authentication systems provide solutions to the problems in high security which remain with conventionalsecurity systems. In a biometric verification system, human’s biological parameters (such as voice, finger print,palm print or hand geometry, face, iris etc. are used to verify the authenticity of a person. These parameters are good to beused as biometric parameters but do not provide the guarantee that the person is present and alive. As voice can be copied,finger print can be picked from glass on synthetic skin and in face recognition system due to genetic factors identical twinsor father-son may have the same facial appearance. ECG does not have these problems. It can not be recorded without theknowledge of the person and ECG of every person is unique even identical twins have different ECG. In this paper an ECGbasedbiometrics verification system which was developed using Laboratory Virtual Instruments Engineering Workbench(LabVIEW version 7.1 is discussed. Experiments were conducted on the database stored in the laboratory of 20 individualshaving 10 samples each and the results revealed a false rejection rate (FRR of 3% and false acceptance rate (FAR of 3.21%.

  17. Cleanup Verification Package for the 618-8 Burial Ground

    International Nuclear Information System (INIS)

    Appel, M.J.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-8 Burial Ground, also referred to as the Solid Waste Burial Ground No. 8, 318-8, and the Early Solid Waste Burial Ground. During its period of operation, the 618-8 site is speculated to have been used to bury uranium-contaminated waste derived from fuel manufacturing, and construction debris from the remodeling of the 313 Building

  18. 75 FR 4100 - Enterprise Income Verification (EIV) System-Debts Owed to PHAs and Terminations

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-04] Enterprise Income Verification (EIV) System-Debts Owed to PHAs and Terminations AGENCY: Office of the Chief Information Officer... Following Information Title of Proposal: Enterprise Income Verification (EIV) System- Debts Owed to PHAs and...

  19. Enrichment Assay Methods Development for the Integrated Cylinder Verification System

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Leon E.; Misner, Alex C.; Hatchell, Brian K.; Curtis, Michael M.

    2009-10-22

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility's entire product-cylinder inventory. Pacific Northwest National Laboratory (PNNL) is developing a concept to automate the verification of enrichment plant cylinders to enable 100 percent product-cylinder verification and potentially, mass-balance calculations on the facility as a whole (by also measuring feed and tails cylinders). The Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The three main objectives of this FY09 project are summarized here and described in more detail in the report: (1) Develop a preliminary design for a prototype NDA system, (2) Refine PNNL's MCNP models of the NDA system, and (3) Procure and test key pulse-processing components. Progress against these tasks to date, and next steps, are discussed.

  20. Enrichment Assay Methods Development for the Integrated Cylinder Verification System

    International Nuclear Information System (INIS)

    Smith, Leon E.; Misner, Alex C.; Hatchell, Brian K.; Curtis, Michael M.

    2009-01-01

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility's entire product-cylinder inventory. Pacific Northwest National Laboratory (PNNL) is developing a concept to automate the verification of enrichment plant cylinders to enable 100 percent product-cylinder verification and potentially, mass-balance calculations on the facility as a whole (by also measuring feed and tails cylinders). The Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The three main objectives of this FY09 project are summarized here and described in more detail in the report: (1) Develop a preliminary design for a prototype NDA system, (2) Refine PNNL's MCNP models of the NDA system, and (3) Procure and test key pulse-processing components. Progress against these tasks to date, and next steps, are discussed.

  1. Development of a tool for knowledge base verification of expert system based on Design/CPN

    International Nuclear Information System (INIS)

    Kim, Jong Hyun

    1998-02-01

    Verification is a necessary work in developing a reliable expert system. Verification is a process aimed at demonstrating whether a system meets it's specified requirements. As expert systems are used in various applications, the knowledge base verification of systems takes an important position. The conventional Petri net approach that has been studied recently in order to verify the knowledge base is found that it is inadequate to verify the knowledge base of large and complex system, such as alarm processing system of nuclear power plant. Thus, we propose an improved method that models the knowledge base as enhanced colored Petri net. In this study, we analyze the reachability and the error characteristics of the knowledge base. Generally, verification process requires computational support by automated tools. For this reason, this study developed a tool for knowledge base verification based on Design/CPN, which is a tool for editing, modeling, and simulating Colored Petri net. This tool uses Enhanced Colored Petri net as a modeling method. By applying this tool to the knowledge base of nuclear power plant, it is noticed that it can successfully check most of the anomalies that can occur in a knowledge base

  2. Scenario-based verification of real-time systems using UPPAAL

    DEFF Research Database (Denmark)

    Li, Shuhao; Belaguer, Sandie; David, Alexandre

    2010-01-01

    Abstract This paper proposes two approaches to tool-supported automatic verification of dense real-time systems against scenario-based requirements, where a system is modeled as a network of timed automata (TAs) or as a set of driving live sequence charts (LSCs), and a requirement is specified...... as a separate monitored LSC chart. We make timed extensions to a kernel subset of the LSC language and define a trace-based semantics. By translating a monitored LSC chart to a behavior-equivalent observer TA and then non-intrusively composing this observer with the original TA modeled real-time system......, the problem of scenario-based verification reduces to a computation tree logic (CTL) real-time model checking problem. In case the real time system is modeled as a set of driving LSC charts, we translate these driving charts and the monitored chart into a behavior-equivalent network of TAs by using a “one...

  3. Safeguards considerations related to the use of multi-purpose canisters in the Civilian Radioactive Waste Management system

    International Nuclear Information System (INIS)

    Floyd, W.C.

    1995-01-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for disposing of the nation's high-level radioactive waste. Currently, DOE is considering the use of Multi-Purpose Canisters (MPCs) to containerize commercial spent nuclear fuel (SNF) to be handled by the system. To achieve its safeguards and security objectives, OCRWM plans to institute a US Regulatory Commission (NRC)-approved safeguards program. Since the Mined Geologic Disposal System (MGDS) facility and a possible Monitored Retrievable Storage (MRS) facility may be subject to selection for International Atomic Energy Agency (IAEA) inspections, the safeguards program for MPCs may not preclude compliance with the requirements of the IAEA's Annex D, Special Criteria for Difficult-to-Access Fuel Items. MPC safeguards are based on three principles: Verification, Material Control and Accounting, and Physical Protection

  4. VERIFICATION OF THE FOOD SAFETY MANAGEMENT SYSTEM IN DEEP FROZEN FOOD PRODUCTION PLANT

    Directory of Open Access Journals (Sweden)

    Peter Zajác

    2010-07-01

    Full Text Available In work is presented verification of food safety management system of deep frozen food. Main emphasis is on creating set of verification questions within articles of standard STN EN ISO 22000:2006 and on searching of effectiveness in food safety management system. Information were acquired from scientific literature sources and they pointed out importance of implementation and upkeep of effective food safety management system. doi:10.5219/28

  5. Verification of the Danish 1990, 2000 and 2010 emission inventory data

    DEFF Research Database (Denmark)

    Fauser, Patrik; Nielsen, Malene; Winther, Morten

    , agriculture, industry and waste. The data are based on the national greenhouse gas inventories for the years 1990 (base year), 2000 and 2010, as reported in 2012, and provided by the UNFCCC and EU. Inter-country comparison and time series consistency check of emissions and implied emission factors is made...... is made with data for energy consumption (Eurostat), agricultural statistics (Eurostat), industrial processes (UN) and waste disposal (OECD). Verification in this approach is a combination of qualitative and quantitative assessments and can assist to identify sectors and categories that require more...... for EU15 countries, excluding Luxemburg and including Norway and Switzerland and for some verification steps also including Australia, Canada, Japan, Russian Federation, USA and aggregated values for EU15 and EU27. National and inter-country verification and time trend consistency check of activity data...

  6. Application of Integrated Verification Approach to FPGA-based Safety-Critical I and C System of Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, Ibrahim; Heo, Gyunyoung [Kyunghee Univ., Yongin (Korea, Republic of); Jung, Jaecheon [KEPCO, Ulsan (Korea, Republic of)

    2016-10-15

    Safety-critical instrumentation and control (I and C) system in nuclear power plant (NPP) implemented on programmable logic controllers (PLCs) plays a vital role in safe operation of the plant. The challenges such as fast obsolescence, the vulnerability to cyber-attack, and other related issues of software systems have currently led to the consideration of field programmable gate arrays (FPGAs) as an alternative to PLCs because of their advantages and hardware related benefits. Generally in FPGA design verification, the designers make use of verification techniques by writing the test benches which involved various stages of verification activities of register-transfer level (RTL), gate-level, and place and route. Writing the test benches is considerably time consuming and require a lot of efforts to achieve a satisfied desire results. Furthermore, performing the verification at each stage is a major bottleneck and demanded much activities and time. In addition, verification is conceivably, the most difficult and complicated aspect of any design. Therefore, in view of these, this work applied an integrated verification approach to the verification of FPGA-based I and C system in NPP that simultaneously verified the whole design modules using MATLAB/Simulink HDL Co-simulation models. Verification is conceivably, the most difficult and complicated aspect of any design, and an FPGA design is not an exception. Therefore, in this work, we introduced and discussed how an application of integrated verification technique to the verification and testing of FPGA-based I and C system design in NPP can facilitate the verification processes, and verify the entire design modules of the system simultaneously using MATLAB/Simulink HDL co-simulation models. In conclusion, the results showed that, the integrated verification approach through MATLAB/Simulink models, if applied to any design to be verified, could speed up the design verification and reduce the V and V tasks.

  7. Application of Integrated Verification Approach to FPGA-based Safety-Critical I and C System of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Ahmed, Ibrahim; Heo, Gyunyoung; Jung, Jaecheon

    2016-01-01

    Safety-critical instrumentation and control (I and C) system in nuclear power plant (NPP) implemented on programmable logic controllers (PLCs) plays a vital role in safe operation of the plant. The challenges such as fast obsolescence, the vulnerability to cyber-attack, and other related issues of software systems have currently led to the consideration of field programmable gate arrays (FPGAs) as an alternative to PLCs because of their advantages and hardware related benefits. Generally in FPGA design verification, the designers make use of verification techniques by writing the test benches which involved various stages of verification activities of register-transfer level (RTL), gate-level, and place and route. Writing the test benches is considerably time consuming and require a lot of efforts to achieve a satisfied desire results. Furthermore, performing the verification at each stage is a major bottleneck and demanded much activities and time. In addition, verification is conceivably, the most difficult and complicated aspect of any design. Therefore, in view of these, this work applied an integrated verification approach to the verification of FPGA-based I and C system in NPP that simultaneously verified the whole design modules using MATLAB/Simulink HDL Co-simulation models. Verification is conceivably, the most difficult and complicated aspect of any design, and an FPGA design is not an exception. Therefore, in this work, we introduced and discussed how an application of integrated verification technique to the verification and testing of FPGA-based I and C system design in NPP can facilitate the verification processes, and verify the entire design modules of the system simultaneously using MATLAB/Simulink HDL co-simulation models. In conclusion, the results showed that, the integrated verification approach through MATLAB/Simulink models, if applied to any design to be verified, could speed up the design verification and reduce the V and V tasks

  8. Simulation-based design process for the verification of ITER remote handling systems

    International Nuclear Information System (INIS)

    Sibois, Romain; Määttä, Timo; Siuko, Mikko; Mattila, Jouni

    2014-01-01

    Highlights: •Verification and validation process for ITER remote handling system. •Simulation-based design process for early verification of ITER RH systems. •Design process centralized around simulation lifecycle management system. •Verification and validation roadmap for digital modelling phase. -- Abstract: The work behind this paper takes place in the EFDA's European Goal Oriented Training programme on Remote Handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. One of the projects of this programme focuses on the verification and validation (V and V) of ITER RH system requirements using digital mock-ups (DMU). The purpose of this project is to study and develop efficient approach of using DMUs in the V and V process of ITER RH system design utilizing a System Engineering (SE) framework. Complex engineering systems such as ITER facilities lead to substantial rise of cost while manufacturing the full-scale prototype. In the V and V process for ITER RH equipment, physical tests are a requirement to ensure the compliance of the system according to the required operation. Therefore it is essential to virtually verify the developed system before starting the prototype manufacturing phase. This paper gives an overview of the current trends in using digital mock-up within product design processes. It suggests a simulation-based process design centralized around a simulation lifecycle management system. The purpose of this paper is to describe possible improvements in the formalization of the ITER RH design process and V and V processes, in order to increase their cost efficiency and reliability

  9. Verification test of an engineering-scale multi-purpose radwaste incinerator

    International Nuclear Information System (INIS)

    Wang Peiyi; Zhou Lianquan; Ma Mingxie; Qiu Mingcai; Yang Liguo; Li Xiaohai; Zhang Xiaobin; Lu Xiaowu; Dong Jingling; Wang Xujin; Li Chuanlian; Yang Baomin

    2002-01-01

    The verification test of an engineering-scale multi-purpose radwaste incinerator was implemented. The test items include performance determination for the system when solid wastes (include resins) or spent oil were incinerating and off gas was cleaning, tracer test for determining decontamination factor and 72 h continuos running test. 500 h tests verify the reliability and feasibility of designs of technological process, main structure, instrument control and system safety. The incineration system ran smoothly, devices and instruments worked stably. The specifications such as capacity, volume reduction factor, carbon remainder in ash and decontamination factor all meet the design requirements

  10. Methods for maintaining a record of waste packages during waste processing and storage

    International Nuclear Information System (INIS)

    2005-01-01

    During processing, radioactive waste is converted into waste packages, and then sent for storage and ultimately for disposal. A principal condition for acceptance of a waste package is its full compliance with waste acceptance criteria for disposal or storage. These criteria define the radiological, mechanical, physical, chemical and biological properties of radioactive waste that can, in principle, be changed during waste processing. To declare compliance of a waste package with waste acceptance criteria, a system for generating and maintaining records should be established to record and track all relevant information, from raw waste characteristics, through changes related to waste processing, to final checking and verification of waste package parameters. In parallel, records on processing technology and the operational parameters of technological facilities should adhere to established and approved quality assurance systems. A records system for waste management should be in place, defining the data to be collected and stored at each step of waste processing and using a reliable selection process carried over into the individual steps of the waste processing flow stream. The waste management records system must at the same time ensure selection and maintenance of all the main information, not only providing evidence of compliance of waste package parameters with waste acceptance criteria but also serving as an information source in the case of any future operations involving the stored or disposed waste. Records generated during waste processing are a constituent part of the more complex system of waste management record keeping, covering the entire life cycle of radioactive waste from generation to disposal and even the post-closure period of a disposal facility. The IAEA is systematically working on the preparation of a set of publications to assist its Member States in the development and implementation of such a system. This report covers all the principal

  11. Experimental inventory verification system

    International Nuclear Information System (INIS)

    Steverson, C.A.; Angerman, M.I.

    1991-01-01

    As Low As Reasonably Achievable (ALARA) goals and Department of Energy (DOE) inventory requirements are frequently in conflict at facilities across the DOE complex. The authors wish, on one hand, to verify the presence of correct amounts of nuclear materials that are in storage or in process; yet on the other hand, we wish to achieve ALARA goals by keeping individual and collective exposures as low as social, technical, economic, practical, and public policy considerations permit. The Experimental Inventory Verification System (EIVSystem) is a computer-based, camera-driven system that utilizes image processing technology to detect change in vault areas. Currently in the test and evaluation phase at Idaho National Engineering Laboratory, this system guards personnel. The EIVSystem continually monitors the vault, providing proof of changed status for objects sorted within the vault. This paper reports that these data could provide the basis for reducing inventory requirements when no change has occurred, thus helping implement ALARA policy; the data will also help describe there target area of an inventory when change has been shown to occur

  12. Mathematical verification of a nuclear power plant protection system function with combined CPN and PVS

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Seo Ryong; Son, Han Seong; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1999-12-31

    In this work, an automatic software verification method for Nuclear Power Plant (NPP) protection system is developed. This method utilizes Colored Petri Net (CPN) for modeling and Prototype Verification System (PVS) for mathematical verification. In order to help flow-through from modeling by CPN to mathematical proof by PVS, a translator has been developed in this work. The combined method has been applied to a protection system function of Wolsong NPP SDS2(Steam Generator Low Level Trip) and found to be promising for further research and applications. 7 refs., 10 figs. (Author)

  13. Mathematical verification of a nuclear power plant protection system function with combined CPN and PVS

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Seo Ryong; Son, Han Seong; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1998-12-31

    In this work, an automatic software verification method for Nuclear Power Plant (NPP) protection system is developed. This method utilizes Colored Petri Net (CPN) for modeling and Prototype Verification System (PVS) for mathematical verification. In order to help flow-through from modeling by CPN to mathematical proof by PVS, a translator has been developed in this work. The combined method has been applied to a protection system function of Wolsong NPP SDS2(Steam Generator Low Level Trip) and found to be promising for further research and applications. 7 refs., 10 figs. (Author)

  14. Radioactive waste isolation in salt: special advisory report on the status of the Office of Nuclear Waste Isolation's plans for repository performance assessment

    International Nuclear Information System (INIS)

    Ditmars, J.D.; Walbridge, E.W.; Rote, D.M.; Harrison, W.; Herzenberg, C.L.

    1983-10-01

    Repository performance assessment is analysis that identifies events and processes that might affect a repository system for isolation of radioactive waste, examines their effects on barriers to waste migration, and estimates the probabilities of their occurrence and their consequences. In 1983 Battelle Memorial Institute's Office of Nuclear Waste Isolation (ONWI) prepared two plans - one for performance assessment for a waste repository in salt and one for verification and validation of performance assessment technology. At the request of the US Department of Energy's Salt Repository Project Office (SRPO), Argonne National Laboratory reviewed those plans and prepared this report to advise SRPO of specific areas where ONWI's plans for performance assessment might be improved. This report presents a framework for repository performance assessment that clearly identifies the relationships among the disposal problems, the processes underlying the problems, the tools for assessment (computer codes), and the data. In particular, the relationships among important processes and 26 model codes available to ONWI are indicated. A common suggestion for computer code verification and validation is the need for specific and unambiguous documentation of the results of performance assessment activities. A major portion of this report consists of status summaries of 27 model codes indicated as potentially useful by ONWI. The code summaries focus on three main areas: (1) the code's purpose, capabilities, and limitations; (2) status of the elements of documentation and review essential for code verification and validation; and (3) proposed application of the code for performance assessment of salt repository systems. 15 references, 6 figures, 4 tables

  15. In Situ Object Counting System (ISOCS) Technique: Cost-Effective Tool for NDA Verification in IAEA Safeguards

    International Nuclear Information System (INIS)

    Braverman, E.; Lebrun, A.; Nizhnik, V.; Rorif, F.

    2010-01-01

    Uranium materials measurements using the ISOCS technique play an increasing role in IAEA verification activities. This methodology provides high uranium/plutonium sensitivity and a low detection limit together with the capability to measure items with different shapes and sizes. In addition, the numerical absolute efficiency calibration of a germanium detector which is used by the technique does not require any calibration standards or reference materials. ISOCS modelling software allows performing absolute efficiency calibration for items of arbitrary container shape and wall material, matrix chemical composition, material fill-height, uranium or plutonium weight fraction inside the matrix and even nuclear material/matrix non-homogeneous distribution. Furthermore, in a number of cases, some key parameters such as matrix density and U/Pu weight fraction can be determined along with analysis of nuclear material mass and isotopic composition. These capabilities provide a verification solution suitable for a majority of cases where quantitative and isotopic analysis should be performed. Today, the basic tool for uranium and plutonium mass measurement used in Safeguards verification activities is the neutron counting technique which employs neutron coincidence and multiplicity counters. In respect to the neutron counting technique, ISOCS calibrated detectors have relatively low cost. Taking into account its advantages, this methodology becomes a cost-effective solution for nuclear material NDA verification. At present, the Agency uses ISOCS for quantitative analysis in a wide range of applications: - Uranium scrap materials; - Uranium contaminated solid wastes; - Uranium fuel elements; - Some specific verification cases like measurement of Pu-Be neutron sources, quantification of fission products in solid wastes etc. For uranium hold-up measurements, ISOCS the only available methodology for quantitative and isotopic composition analysis of nuclear materials deposited

  16. Alien Registration Number Verification via the U.S. Citizenship and Immigration Service's Systematic Alien Verification for Entitlements System

    National Research Council Canada - National Science Library

    Ainslie, Frances M; Buck, Kelly R

    2008-01-01

    The purpose of this study was to evaluate the implications of conducting high-volume automated checks of the United States Citizenship and Immigration Services Systematic Allen Verification for Entitlements System (SAVE...

  17. Verification station for Sandia/Rockwell Plutonium Protection system

    International Nuclear Information System (INIS)

    Nicholson, N.; Hastings, R.D.; Henry, C.N.; Millegan, D.R.

    1979-04-01

    A verification station has been designed to confirm the presence of plutonium within a container module. These container modules [about 13 cm (5 in.) in diameter and 23 cm (9 in.) high] hold sealed food-pack cans containing either plutonium oxide or metal and were designed by Sandia Laboratories to provide security and continuous surveillance and safety. After the plutonium is placed in the container module, it is closed with a solder seal. The verification station discussed here is used to confirm the presence of plutonium in the container module before it is placed in a carousel-type storage array inside the plutonium storage vault. This measurement represents the only technique that uses nuclear detectors in the plutonium protection system

  18. Infectious waste feed system

    Science.gov (United States)

    Coulthard, E. James

    1994-01-01

    An infectious waste feed system for comminuting infectious waste and feeding the comminuted waste to a combustor automatically without the need for human intervention. The system includes a receptacle for accepting waste materials. Preferably, the receptacle includes a first and second compartment and a means for sealing the first and second compartments from the atmosphere. A shredder is disposed to comminute waste materials accepted in the receptacle to a predetermined size. A trough is disposed to receive the comminuted waste materials from the shredder. A feeding means is disposed within the trough and is movable in a first and second direction for feeding the comminuted waste materials to a combustor.

  19. Verification and validation of control system software

    International Nuclear Information System (INIS)

    Munro, J.K. Jr.; Kisner, R.A.; Bhadtt, S.C.

    1991-01-01

    The following guidelines are proposed for verification and validation (V ampersand V) of nuclear power plant control system software: (a) use risk management to decide what and how much V ampersand V is needed; (b) classify each software application using a scheme that reflects what type and how much V ampersand V is needed; (c) maintain a set of reference documents with current information about each application; (d) use Program Inspection as the initial basic verification method; and (e) establish a deficiencies log for each software application. The following additional practices are strongly recommended: (a) use a computer-based configuration management system to track all aspects of development and maintenance; (b) establish reference baselines of the software, associated reference documents, and development tools at regular intervals during development; (c) use object-oriented design and programming to promote greater software reliability and reuse; (d) provide a copy of the software development environment as part of the package of deliverables; and (e) initiate an effort to use formal methods for preparation of Technical Specifications. The paper provides background information and reasons for the guidelines and recommendations. 3 figs., 3 tabs

  20. Geometrical verification system using Adobe Photoshop in radiotherapy.

    Science.gov (United States)

    Ishiyama, Hiromichi; Suzuki, Koji; Niino, Keiji; Hosoya, Takaaki; Hayakawa, Kazushige

    2005-02-01

    Adobe Photoshop is used worldwide and is useful for comparing portal films with simulation films. It is possible to scan images and then view them simultaneously with this software. The purpose of this study was to assess the accuracy of a geometrical verification system using Adobe Photoshop. We prepared the following two conditions for verification. Under one condition, films were hanged on light boxes, and examiners measured distances between the isocenter on simulation films and that on portal films by adjusting the bony structures. Under the other condition, films were scanned into a computer and displayed using Adobe Photoshop, and examiners measured distances between the isocenter on simulation films and those on portal films by adjusting the bony structures. To obtain control data, lead balls were used as a fiducial point for matching the films accurately. The errors, defined as the differences between the control data and the measurement data, were assessed. Errors of the data obtained using Adobe Photoshop were significantly smaller than those of the data obtained from films on light boxes (p Adobe Photoshop is available on any PC with this software and is useful for improving the accuracy of verification.

  1. ETV REPORT AND VERIFICATION STATEMENT - KASELCO POSI-FLO ELECTROCOAGULATION TREATMENT SYSTEM

    Science.gov (United States)

    The Kaselco Electrocoagulation Treatment System (Kaselco system) in combination with an ion exchange polishing system was tested, under actual production conditions, processing metal finishing wastewater at Gull Industries in Houston, Texas. The verification test evaluated the a...

  2. Standard Verification System (SVS)

    Data.gov (United States)

    Social Security Administration — SVS is a mainframe program that accesses the NUMIDENT to perform SSN verifications. This program is called by SSA Internal applications to verify SSNs. There is also...

  3. Remaining Sites Verification Package for the 116-F-16, PNL Outfall and the 100-F-43, PNL Outfall Spillway. Attachment to Waste Site Reclassification Form 2006-039 and 2006-096

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 116-F-16 waste site is the former Pacific National Laboratories (PNL) Outfall, used to discharge waste effluents from the 100-F Experimental Animal Farm. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  4. Automated Offline Arabic Signature Verification System using Multiple Features Fusion for Forensic Applications

    Directory of Open Access Journals (Sweden)

    Saad M. Darwish

    2016-12-01

    Full Text Available The signature of a person is one of the most popular and legally accepted behavioral biometrics that provides a secure means for verification and personal identification in many applications such as financial, commercial and legal transactions. The objective of the signature verification system is to classify between genuine and forged signatures that are often associated with intrapersonal and interpersonal variability. Unlike other languages, Arabic has unique features; it contains diacritics, ligatures, and overlapping. Because of lacking any form of dynamic information during the Arabic signature’s writing process, it will be more difficult to obtain higher verification accuracy. This paper addresses the above difficulty by introducing a novel offline Arabic signature verification algorithm. The key point is using multiple feature fusion with fuzzy modeling to capture different aspects of a signature individually in order to improve the verification accuracy. State-of-the-art techniques adopt the fuzzy set to describe the properties of the extracted features to handle a signature’s uncertainty; this work also employs the fuzzy variables to describe the degree of similarity of the signature’s features to deal with the ambiguity of questioned document examiner judgment of signature similarity. It is concluded from the experimental results that the verification system performs well and has the ability to reduce both False Acceptance Rate (FAR and False Rejection Rate (FRR.

  5. Verification of product quality from process control

    International Nuclear Information System (INIS)

    Drobot, A.; Bunnell, L.R.; Freeborn, W.P.; Macedo, P.B.; Mellinger, G.B.; Pegg, I.L.; Piepel, G.F.; Reimus, M.A.H.; Routt, K.R.; Saad, E.

    1989-01-01

    Process models were developed to characterize the waste vitrification at West Valley, in terms of process operating constraints and glass compositions achievable. The need for verification of compliance with the proposed Waste Acceptance Preliminary Specification criteria led to development of product models, the most critical one being a glass durability model. Both process and product models were used in developing a target composition for the waste glass. This target composition designed to ensure that glasses made to this target will be of acceptable durability after all process variations have been accounted for. 4 refs., 11 figs., 5 tabs

  6. A knowledge-base verification of NPP expert systems using extended Petri nets

    International Nuclear Information System (INIS)

    Kwon, Il Won; Seong, Poong Hyun

    1995-01-01

    The verification phase of knowledge base is an important part for developing reliable expert systems, especially in nuclear industry. Although several strategies or tools have been developed to perform potential error checking, they often neglect the reliability of verification methods. Because a Petri net provides a uniform mathematical formalization of knowledge base, it has been employed for knowledge base verification. In this work, we devise and suggest an automated tool, called COKEP (Checker Of Knowledge base using Extended Petri net), for detecting incorrectness, inconsistency, and incompleteness in a knowledge base. The scope of the verification problem is expanded to chained errors, unlike previous studies that assumed error incidence to be limited to rule pairs only. In addition, we consider certainty factor in checking, because most of knowledge bases have certainty factors

  7. Burnup verification using the FORK measurement system

    International Nuclear Information System (INIS)

    Ewing, R.I.

    1994-01-01

    Verification measurements may be used to help ensure nuclear criticality safety when burnup credit is applied to spent fuel transport and storage systems. The FORK measurement system, designed at Los Alamos National Laboratory for the International Atomic Energy Agency safeguards program, has been used to verify reactor site records for burnup and cooling time for many years. The FORK system measures the passive neutron and gamma-ray emission from spent fuel assemblies while in the storage pool. This report deals with the application of the FORK system to burnup credit operations based on measurements performed on spent fuel assemblies at the Oconee Nuclear Station of Duke Power Company

  8. Verification and disarmament

    Energy Technology Data Exchange (ETDEWEB)

    Blix, H. [IAEA, Vienna (Austria)

    1998-07-01

    The main features are described of the IAEA safeguards verification system that non-nuclear weapon states parties of the NPT are obliged to accept. Verification activities/problems in Iraq and North Korea are discussed.

  9. Verification and disarmament

    International Nuclear Information System (INIS)

    Blix, H.

    1998-01-01

    The main features are described of the IAEA safeguards verification system that non-nuclear weapon states parties of the NPT are obliged to accept. Verification activities/problems in Iraq and North Korea are discussed

  10. Hanford Waste Vitrification Plant applied technology plan

    International Nuclear Information System (INIS)

    Kruger, O.L.

    1990-09-01

    This Applied Technology Plan describes the process development, verification testing, equipment adaptation, and waste form qualification technical issues and plans for resolution to support the design, permitting, and operation of the Hanford Waste Vitrification Plant. The scope of this Plan includes work to be performed by the research and development contractor, Pacific Northwest Laboratory, other organizations within Westinghouse Hanford Company, universities and companies with glass technology expertise, and other US Department of Energy sites. All work described in this Plan is funded by the Hanford Waste Vitrification Plant Project and the relationship of this Plan to other waste management documents and issues is provided for background information. Work to performed under this Plan is divided into major areas that establish a reference process, develop an acceptable glass composition envelope, and demonstrate feed processing and glass production for the range of Hanford Waste Vitrification Plant feeds. Included in this work is the evaluation and verification testing of equipment and technology obtained from the Defense Waste Processing Facility, the West Valley Demonstration Project, foreign countries, and the Hanford Site. Development and verification of product and process models and other data needed for waste form qualification documentation are also included in this Plan. 21 refs., 4 figs., 33 tabs

  11. Palmprint Based Verification System Using SURF Features

    Science.gov (United States)

    Srinivas, Badrinath G.; Gupta, Phalguni

    This paper describes the design and development of a prototype of robust biometric system for verification. The system uses features extracted using Speeded Up Robust Features (SURF) operator of human hand. The hand image for features is acquired using a low cost scanner. The palmprint region extracted is robust to hand translation and rotation on the scanner. The system is tested on IITK database of 200 images and PolyU database of 7751 images. The system is found to be robust with respect to translation and rotation. It has FAR 0.02%, FRR 0.01% and accuracy of 99.98% and can be a suitable system for civilian applications and high-security environments.

  12. Nuclear waste management. Quarterly progress report, January-March, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Chikalla, T.D.; Powell, J.A. (comp.)

    1981-06-01

    Reports and summaries are provided for the following programs: high-level waste process development; alternative waste forms; nuclear waste materials characterization center; TRU waste immobilization; TRU waste decontamination; krypton solidification; thermal outgassing; iodine-129 fixation; NWVP off-gas analysis; monitoring and physical characterization of unsaturated zone transport; well-logging instrumentation development; verification instrument development; mobility of organic complexes of radionuclide in soils; low-level waste generation reduction handbook; waste management system studies; assessment of effectiveness of geologic isolation systems; waste/rock interactions technology program; high-level waste form preparation; development of backfill materials; development of structural engineered barriers; disposal charge analysis; analysis of spent fuel policy implementation; spent fuel and pool component integrity program; analysis of postulated criticality events in a storage array of spent LWR fuel; asphalt emulsion sealing of uranium mill tailings; liner evaluation for uranium mill tailings; multilayer barriers for sealing of uranium tailings; application of long-term chemical biobarriers for uranium tailings; and revegetation of inactive uranium tailings sites.

  13. Advanced verification topics

    CERN Document Server

    Bhattacharya, Bishnupriya; Hall, Gary; Heaton, Nick; Kashai, Yaron; Khan Neyaz; Kirshenbaum, Zeev; Shneydor, Efrat

    2011-01-01

    The Accellera Universal Verification Methodology (UVM) standard is architected to scale, but verification is growing and in more than just the digital design dimension. It is growing in the SoC dimension to include low-power and mixed-signal and the system integration dimension to include multi-language support and acceleration. These items and others all contribute to the quality of the SOC so the Metric-Driven Verification (MDV) methodology is needed to unify it all into a coherent verification plan. This book is for verification engineers and managers familiar with the UVM and the benefits it brings to digital verification but who also need to tackle specialized tasks. It is also written for the SoC project manager that is tasked with building an efficient worldwide team. While the task continues to become more complex, Advanced Verification Topics describes methodologies outside of the Accellera UVM standard, but that build on it, to provide a way for SoC teams to stay productive and profitable.

  14. Technical Note: Range verification system using edge detection method for a scintillator and a CCD camera system

    Energy Technology Data Exchange (ETDEWEB)

    Saotome, Naoya, E-mail: naosao@nirs.go.jp; Furukawa, Takuji; Hara, Yousuke; Mizushima, Kota; Tansho, Ryohei; Saraya, Yuichi; Shirai, Toshiyuki; Noda, Koji [Department of Research Center for Charged Particle Therapy, National Institute of Radiological Sciences, 4-9-1 Anagawa, Inage-ku, Chiba 263-8555 (Japan)

    2016-04-15

    Purpose: Three-dimensional irradiation with a scanned carbon-ion beam has been performed from 2011 at the authors’ facility. The authors have developed the rotating-gantry equipped with the scanning irradiation system. The number of combinations of beam properties to measure for the commissioning is more than 7200, i.e., 201 energy steps, 3 intensities, and 12 gantry angles. To compress the commissioning time, quick and simple range verification system is required. In this work, the authors develop a quick range verification system using scintillator and charge-coupled device (CCD) camera and estimate the accuracy of the range verification. Methods: A cylindrical plastic scintillator block and a CCD camera were installed on the black box. The optical spatial resolution of the system is 0.2 mm/pixel. The camera control system was connected and communicates with the measurement system that is part of the scanning system. The range was determined by image processing. Reference range for each energy beam was determined by a difference of Gaussian (DOG) method and the 80% of distal dose of the depth-dose distribution that were measured by a large parallel-plate ionization chamber. The authors compared a threshold method and a DOG method. Results: The authors found that the edge detection method (i.e., the DOG method) is best for the range detection. The accuracy of range detection using this system is within 0.2 mm, and the reproducibility of the same energy measurement is within 0.1 mm without setup error. Conclusions: The results of this study demonstrate that the authors’ range check system is capable of quick and easy range verification with sufficient accuracy.

  15. Technical Note: Range verification system using edge detection method for a scintillator and a CCD camera system

    International Nuclear Information System (INIS)

    Saotome, Naoya; Furukawa, Takuji; Hara, Yousuke; Mizushima, Kota; Tansho, Ryohei; Saraya, Yuichi; Shirai, Toshiyuki; Noda, Koji

    2016-01-01

    Purpose: Three-dimensional irradiation with a scanned carbon-ion beam has been performed from 2011 at the authors’ facility. The authors have developed the rotating-gantry equipped with the scanning irradiation system. The number of combinations of beam properties to measure for the commissioning is more than 7200, i.e., 201 energy steps, 3 intensities, and 12 gantry angles. To compress the commissioning time, quick and simple range verification system is required. In this work, the authors develop a quick range verification system using scintillator and charge-coupled device (CCD) camera and estimate the accuracy of the range verification. Methods: A cylindrical plastic scintillator block and a CCD camera were installed on the black box. The optical spatial resolution of the system is 0.2 mm/pixel. The camera control system was connected and communicates with the measurement system that is part of the scanning system. The range was determined by image processing. Reference range for each energy beam was determined by a difference of Gaussian (DOG) method and the 80% of distal dose of the depth-dose distribution that were measured by a large parallel-plate ionization chamber. The authors compared a threshold method and a DOG method. Results: The authors found that the edge detection method (i.e., the DOG method) is best for the range detection. The accuracy of range detection using this system is within 0.2 mm, and the reproducibility of the same energy measurement is within 0.1 mm without setup error. Conclusions: The results of this study demonstrate that the authors’ range check system is capable of quick and easy range verification with sufficient accuracy.

  16. Model reliability and software quality assurance in simulation of nuclear fuel waste management systems

    International Nuclear Information System (INIS)

    Oeren, T.I.; Elzas, M.S.; Sheng, G.; Wageningen Agricultural Univ., Netherlands; McMaster Univ., Hamilton, Ontario)

    1985-01-01

    As is the case with all scientific simulation studies, computerized simulation of nuclear fuel waste management systems can introduce and hide various types of errors. Frameworks to clarify issues of model reliability and software quality assurance are offered. Potential problems with reference to the main areas of concern for reliability and quality are discussed; e.g., experimental issues, decomposition, scope, fidelity, verification, requirements, testing, correctness, robustness are treated with reference to the experience gained in the past. A list comprising over 80 most common computerization errors is provided. Software tools and techniques used to detect and to correct computerization errors are discussed

  17. SNF verification requirements imposed through 10 CFR Part 961: Interrelationship with MC ampersand A requirements for the OCRWM safeguards system

    International Nuclear Information System (INIS)

    Slater, N.; Vance, S.

    1994-01-01

    Article VI.B.2 of the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961, Standard Contract) provides that spent nuclear fuel shall be subject to verification prior to acceptance by the Department of Energy. As part of the overall process for scheduling deliveries of spent nuclear fuel, the Standard Contract requires contract holders to submit detailed descriptions of the spent nuclear fuel they intend to deliver. Thus, the provision for verification in the Standard contract allows the Department the opportunity to ensure that the spent nuclear fuel intended for deliver is consistent with the description provided, and that the material is properly loaded, packaged, marked, and labeled. The Department is currently evaluating the verification requirements for spent nuclear fuel that it will establish pursuant to Article VI.B.2 of the Standard Contract. The Department recognizes that there may be significant overlap between these verification requirements and the requirements established for material control and accountability (MC ampersand A). Therefore, the Department may recommend modifications to the process established in the Standard Contract to ensure that the verification and MC ampersand A functions and activities are fully integrated

  18. Verification and validation benchmarks.

    Energy Technology Data Exchange (ETDEWEB)

    Oberkampf, William Louis; Trucano, Timothy Guy

    2007-02-01

    Verification and validation (V&V) are the primary means to assess the accuracy and reliability of computational simulations. V&V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V&V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the level of

  19. Hanford Site Tank Waste Remediation System

    International Nuclear Information System (INIS)

    1993-05-01

    The US Department of Energy's (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives

  20. Procedure generation and verification

    International Nuclear Information System (INIS)

    Sheely, W.F.

    1986-01-01

    The Department of Energy has used Artificial Intelligence of ''AI'' concepts to develop two powerful new computer-based techniques to enhance safety in nuclear applications. The Procedure Generation System, and the Procedure Verification System, can be adapted to other commercial applications, such as a manufacturing plant. The Procedure Generation System can create a procedure to deal with the off-normal condition. The operator can then take correct actions on the system in minimal time. The Verification System evaluates the logic of the Procedure Generator's conclusions. This evaluation uses logic techniques totally independent of the Procedure Generator. The rapid, accurate generation and verification of corrective procedures can greatly reduce the human error, possible in a complex (stressful/high stress) situation

  1. Groundwater flow code verification ''benchmarking'' activity (COVE-2A): Analysis of participants' work

    International Nuclear Information System (INIS)

    Dykhuizen, R.C.; Barnard, R.W.

    1992-02-01

    The Nuclear Waste Repository Technology Department at Sandia National Laboratories (SNL) is investigating the suitability of Yucca Mountain as a potential site for underground burial of nuclear wastes. One element of the investigations is to assess the potential long-term effects of groundwater flow on the integrity of a potential repository. A number of computer codes are being used to model groundwater flow through geologic media in which the potential repository would be located. These codes compute numerical solutions for problems that are usually analytically intractable. Consequently, independent confirmation of the correctness of the solution is often not possible. Code verification is a process that permits the determination of the numerical accuracy of codes by comparing the results of several numerical solutions for the same problem. The international nuclear waste research community uses benchmarking for intercomparisons that partially satisfy the Nuclear Regulatory Commission (NRC) definition of code verification. This report presents the results from the COVE-2A (Code Verification) project, which is a subset of the COVE project

  2. Implementation of SAP Waste Management System

    International Nuclear Information System (INIS)

    Frost, M.L.; LaBorde, C.M.; Nichols, C.D.

    2008-01-01

    The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

  3. Applying Formal Verification Techniques to Ambient Assisted Living Systems

    Science.gov (United States)

    Benghazi, Kawtar; Visitación Hurtado, María; Rodríguez, María Luisa; Noguera, Manuel

    This paper presents a verification approach based on timed traces semantics and MEDISTAM-RT [1] to check the fulfillment of non-functional requirements, such as timeliness and safety, and assure the correct functioning of the Ambient Assisted Living (AAL) systems. We validate this approach by its application to an Emergency Assistance System for monitoring people suffering from cardiac alteration with syncope.

  4. Automatic Verification of Railway Interlocking Systems: A Case Study

    DEFF Research Database (Denmark)

    Petersen, Jakob Lyng

    1998-01-01

    This paper presents experiences in applying formal verification to a large industrial piece of software. The are of application is railway interlocking systems. We try to prove requirements of the program controlling the Swedish railway Station Alingsås by using the decision procedure which...... express thoughts on what is needed in order to be able to successfully verify large real-life systems....

  5. Hazardous Waste Manifest System

    Science.gov (United States)

    EPA’s hazardous waste manifest system is designed to track hazardous waste from the time it leaves the generator facility where it was produced, until it reaches the off-site waste management facility that will store, treat, or dispose of the waste.

  6. Formal verification and validation of the safety-critical software in a digital reactor protection system

    International Nuclear Information System (INIS)

    Kwon, K. C.; Park, G. Y.

    2006-01-01

    This paper describes the Verification and Validation (V and V) activities for the safety-critical software in a Digital Reactor Protection System (DRPS) that is being developed through the Korea nuclear instrumentation and control system project. The main activities of the DRPS V and V process are a preparation of the software planning documentation, a verification of the software according to the software life cycle, a software safety analysis and a software configuration management. The verification works for the Software Requirement Specification (SRS) of the DRPS consist of a technical evaluation, a licensing suitability evaluation, a inspection and traceability analysis, a formal verification, and preparing a test plan and procedure. Especially, the SRS is specified by the formal specification method in the development phase, and the formal SRS is verified by a formal verification method. Through these activities, we believe we can achieve the functionality, performance, reliability, and safety that are the major V and V objectives of the nuclear safety-critical software in a DRPS. (authors)

  7. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    PICKETT, W.W.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure

  8. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  9. Television system for verification and documentation of treatment fields during intraoperative radiation therapy

    International Nuclear Information System (INIS)

    Fraass, B.A.; Harrington, F.S.; Kinsella, T.J.; Sindelar, W.F.

    1983-01-01

    Intraoperative radiation therapy (IORT) involves direct treatment of tumors or tumor beds with large single doses of radiation. The verification of the area to be treated before irradiation and the documentation of the treated area are critical for IORT, just as for other types of radiation therapy. A television system which allows the target area to be directly imaged immediately before irradiation has been developed. Verification and documentation of treatment fields has made the IORT television system indispensable

  10. Cleanup Verification Package for the 118-F-3, Minor Construction Burial Ground

    International Nuclear Information System (INIS)

    Appel, M.J.

    2007-01-01

    This cleanup verification package documents completion of remedial action for the 118-F-3, Minor Construction Burial Ground waste site. This site was an open field covered with cobbles, with no vegetation growing on the surface. The site received irradiated reactor parts that were removed during conversion of the 105-F Reactor from the Liquid 3X to the Ball 3X Project safety systems and received mostly vertical safety rod thimbles and step plugs

  11. Cleanup Verification Package for the 118-F-1 Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    E. J. Farris and H. M. Sulloway

    2008-01-10

    This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

  12. Composite waste analysis system

    International Nuclear Information System (INIS)

    Wachter, J.R.; Hagan, R.C.; Bonner, C.A.; Malcom, J.E.; Camp, K.L.

    1993-01-01

    Nondestructive analysis (NDA) of radioactive waste forms an integral component of nuclear materials accountability programs and waste characterization acceptance criterion. However, waste measurements are often complicated by unknown isotopic compositions and the potential for concealment of special nuclear materials in a manner that is transparent to gamma-ray measurement instruments. To overcome these complications, a new NDA measurement system has been developed to assay special nuclear material in both transuranic and low level waste from the same measurement platform. The system incorporates a NaI detector and customized commercial software routines to measure small quantities of radioactive material in low level waste. Transuranic waste analysis is performed with a coaxial HPGE detector and uses upgraded PC-based segmented gamma scanner software to assay containers up to 55 gal. in volume. Gamma-Ray isotopics analysis of both waste forms is also performed with this detector. Finally, a small neutron counter using specialized software is attached to the measurement platform to satisfy safeguards concerns related to nuclear materials that are not sensed by the gamma-ray instruments. This report describes important features and capabilities of the system and presents a series of test measurements that are to be performed to define system parameters

  13. A Syntactic-Semantic Approach to Incremental Verification

    OpenAIRE

    Bianculli, Domenico; Filieri, Antonio; Ghezzi, Carlo; Mandrioli, Dino

    2013-01-01

    Software verification of evolving systems is challenging mainstream methodologies and tools. Formal verification techniques often conflict with the time constraints imposed by change management practices for evolving systems. Since changes in these systems are often local to restricted parts, an incremental verification approach could be beneficial. This paper introduces SiDECAR, a general framework for the definition of verification procedures, which are made incremental by the framework...

  14. AVNG System Software-Attribute Verification System with Information Barriers for Mass Isotopic Measurements

    International Nuclear Information System (INIS)

    Elmont, T.H.; Langner, Diana C.; MacArthur, D.W.; Mayo, D.R.; Smith, M.K.; Modenov, A.

    2005-01-01

    This report describes the software development for the plutonium attribute verification system - AVNG. A brief synopsis of the technical solution for the measurement system is presented. The main tasks for the software development that is underway are formulated. The development tasks are shown in software structural flowcharts, measurement system state diagram and a description of the software. The current status of the AVNG software development is elucidated.

  15. Integrated Disposal Facility FY 2016: ILAW Verification and Validation of the eSTOMP Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Freedman, Vicky L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bacon, Diana H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fang, Yilin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-13

    This document describes two sets of simulations carried out to further verify and validate the eSTOMP simulator. In this report, a distinction is made between verification and validation, and the focus is on verifying eSTOMP through a series of published benchmarks on cementitious wastes, and validating eSTOMP based on a lysimeter experiment for the glassified waste. These activities are carried out within the context of a scientific view of validation that asserts that models can only be invalidated, and that model validation (and verification) is a subjective assessment.

  16. Ongoing Work on Automated Verification of Noisy Nonlinear Systems with Ariadne

    NARCIS (Netherlands)

    Geretti, Luca; Bresolin, Davide; Collins, Pieter; Zivanovic Gonzalez, Sanja; Villa, Tiziano

    2017-01-01

    Cyber-physical systems (CPS) are hybrid systems that commonly consist of a discrete control part that operates in a continuous environment. Hybrid automata are a convenient model for CPS suitable for formal verification. The latter is based on reachability analysis of the system to trace its hybrid

  17. Mathematical verification of a nuclear power plant protection system function with combined CPN and PVS

    International Nuclear Information System (INIS)

    Koo, Seo Ryong; Son, Han Seong; Seong, Poong Hyun

    1999-01-01

    In this work, an automatic software verification method for Nuclear Power Plant (NPP) protection system is developed. This method utilizes Colored Petri Net (CPN) for system modeling and Prototype Verification System (PVS) for mathematical verification. In order to help flow-through from modeling by CPN to mathematical proof by PVS, an information extractor from CPN models has been developed in this work. In order to convert the extracted information to the PVS specification language, a translator also has been developed. ML that is a higher-order functional language programs the information extractor and translator. This combined method has been applied to a protection system function of Wolsung NPP SDS2 (Steam Generator Low Level Trip). As a result of this application, we could prove completeness and consistency of the requirement logically. Through this work, in short, an axiom or lemma based-analysis method for CPN models is newly suggested in order to complement CPN analysis methods and a guideline for the use of formal methods is proposed in order to apply them to NPP software verification and validation. (author). 9 refs., 15 figs

  18. Remaining Sites Verification Package for the 331 Life Sciences Laboratory Drain Field Septic System. Attachment to Waste Site Reclassification Form 2008-020

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 331 Life Sciences Laboratory Drain Field (LSLDF) septic system waste site consists of a diversion chamber, two septic tanks, a distribution box, and a drain field. This septic system was designed to receive sanitary waste water, from animal studies conducted in the 331-A and 331-B Buildings, for discharge into the soil column. However, field observations and testing suggest the 331 LSLDF septic system did not receive any discharges. In accordance with this evaluation, the confirmatory sampling results support a reclassification of the 331 LSLDF waste site to No Action. This site does not have a deep zone or other condition that would warrant an institutional control in accordance with the 300-FF-2 ROD under the industrial land use scenario

  19. Standard practice for verification and classification of extensometer systems

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This practice covers procedures for the verification and classification of extensometer systems, but it is not intended to be a complete purchase specification. The practice is applicable only to instruments that indicate or record values that are proportional to changes in length corresponding to either tensile or compressive strain. Extensometer systems are classified on the basis of the magnitude of their errors. 1.2 Because strain is a dimensionless quantity, this document can be used for extensometers based on either SI or US customary units of displacement. Note 1—Bonded resistance strain gauges directly bonded to a specimen cannot be calibrated or verified with the apparatus described in this practice for the verification of extensometers having definite gauge points. (See procedures as described in Test Methods E251.) 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish app...

  20. Nuclear Data Verification and Standardization

    Energy Technology Data Exchange (ETDEWEB)

    Karam, Lisa R.; Arif, Muhammad; Thompson, Alan K.

    2011-10-01

    The objective of this interagency program is to provide accurate neutron interaction verification and standardization data for the U.S. Department of Energy Division of Nuclear Physics programs which include astrophysics, radioactive beam studies, and heavy-ion reactions. The measurements made in this program are also useful to other programs that indirectly use the unique properties of the neutron for diagnostic and analytical purposes. These include homeland security, personnel health and safety, nuclear waste disposal, treaty verification, national defense, and nuclear based energy production. The work includes the verification of reference standard cross sections and related neutron data employing the unique facilities and capabilities at NIST and other laboratories as required; leadership and participation in international intercomparisons and collaborations; and the preservation of standard reference deposits. An essential element of the program is critical evaluation of neutron interaction data standards including international coordinations. Data testing of critical data for important applications is included. The program is jointly supported by the Department of Energy and the National Institute of Standards and Technology.

  1. LCA of Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Bakas, Ioannis; Laurent, Alexis; Clavreul, Julie

    2018-01-01

    The chapter explores the application of LCA to solid waste management systems through the review of published studies on the subject. The environmental implications of choices involved in the modelling setup of waste management systems are increasingly in the spotlight, due to public health...... concerns and new legislation addressing the impacts from managing our waste. The application of LCA to solid waste management systems, sometimes called “waste LCA”, is distinctive in that system boundaries are rigorously defined to exclude all life cycle stages except from the end-of-life. Moreover...... LCA on solid waste systems....

  2. Cleanup Verification Package for the 618-3 Burial Ground

    International Nuclear Information System (INIS)

    Appel, M.J.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings

  3. Image-based fingerprint verification system using LabVIEW

    Directory of Open Access Journals (Sweden)

    Sunil K. Singla

    2008-09-01

    Full Text Available Biometric-based identification/verification systems provide a solution to the security concerns in the modern world where machine is replacing human in every aspect of life. Fingerprints, because of their uniqueness, are the most widely used and highly accepted biometrics. Fingerprint biometric systems are either minutiae-based or pattern learning (image based. The minutiae-based algorithm depends upon the local discontinuities in the ridge flow pattern and are used when template size is important while image-based matching algorithm uses both the micro and macro feature of a fingerprint and is used if fast response is required. In the present paper an image-based fingerprint verification system is discussed. The proposed method uses a learning phase, which is not present in conventional image-based systems. The learning phase uses pseudo random sub-sampling, which reduces the number of comparisons needed in the matching stage. This system has been developed using LabVIEW (Laboratory Virtual Instrument Engineering Workbench toolbox version 6i. The availability of datalog files in LabVIEW makes it one of the most promising candidates for its usage as a database. Datalog files can access and manipulate data and complex data structures quickly and easily. It makes writing and reading much faster. After extensive experimentation involving a large number of samples and different learning sizes, high accuracy with learning image size of 100 100 and a threshold value of 700 (1000 being the perfect match has been achieved.

  4. Nuclear-waste-management. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Chikalla, T.D.; Powell, J.A. (comps.)

    1981-12-01

    Progress reports and summaries are presented for the following: high-level waste process development, alternate waste forms; TMI zeolite vitrification demonstration program; nuclear waste materials characterization center; TRU waste immobilization; TRU waste decontamination; krypton implantation; thermal outgassing; iodine-129 fixation; NWVP off-gas analysis; monitoring and physical characterization of unsaturated zone transport; well-logging instrumentation development; verification instrument development; mobility of organic complexes of radionuclides in soils; handbook of methods to decrease the generation of low-level waste; waste management system studies; waste management safety studies; assessment of effectiveness of geologic isolation systems; waste/rock interactions technology program; high-level waste form preparation; development of backfill materials; development of structural engineered barriers; disposal charge analysis; analysis of spent fuel policy implementation; spent fuel and fuel pool component integrity program; analysis of postulated criticality events in a storage array of spent LWR fuel; asphalt emulsion sealing of uranium mill tailings; liner evaluation for uranium mill tailings; multilayer barriers for sealing uranium tailings; application of long-term chemical biobarriers for uranium tailings; and revegetation of inactive uranium tailings sites.

  5. The Changing Adventures of Mixed Low-Level Waste Disposal at the Nevada Test Site

    International Nuclear Information System (INIS)

    2007-01-01

    After a 15-year hiatus, the United States Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO) began accepting DOE off-site generated mixed low-level radioactive waste (MLLW) for disposal at the Nevada Test Site (NTS) in December 2005. This action was predicated on the acceptance by the Nevada Division of Environmental Protection (NDEP) of a waste analysis plan (WAP). The NNSA/NSO agreed to limit mixed waste disposal to 20,000 cubic meters (approximately 706,000 cubic feet) and close the facility by December 2010 or sooner, if the volume limit is reached. The WAP and implementing procedures were developed based on Hanford?s system of verification to the extent possible so the two regional disposal sites could have similar processes. Since the NNSA/NSO does not have a breaching facility to allow the opening of boxes at the site, verification of the waste occurs by visual inspection at the generator/treatment facility or by Real-Time-Radiography (RTR) at the NTS. This system allows the NTS to effectively, efficiently, and compliantly accept MLLW for disposal. The WAP, NTS Waste Acceptance Criteria, and procedures have been revised based on learning experiences. These changes include: RTR expectations; visual inspection techniques; tamper-indicating device selection; void space requirements; and chemical screening concerns. The NNSA/NSO, NDEP, and the generators have been working together throughout the debugging of the verification processes. Additionally, the NNSA/NSO will continue to refine the MLLW acceptance processes and strive for continual improvement of the program

  6. Internet-based dimensional verification system for reverse engineering processes

    International Nuclear Information System (INIS)

    Song, In Ho; Kim, Kyung Don; Chung, Sung Chong

    2008-01-01

    This paper proposes a design methodology for a Web-based collaborative system applicable to reverse engineering processes in a distributed environment. By using the developed system, design reviewers of new products are able to confirm geometric shapes, inspect dimensional information of products through measured point data, and exchange views with other design reviewers on the Web. In addition, it is applicable to verifying accuracy of production processes by manufacturing engineers. Functional requirements for designing this Web-based dimensional verification system are described in this paper. ActiveX-server architecture and OpenGL plug-in methods using ActiveX controls realize the proposed system. In the developed system, visualization and dimensional inspection of the measured point data are done directly on the Web: conversion of the point data into a CAD file or a VRML form is unnecessary. Dimensional verification results and design modification ideas are uploaded to markups and/or XML files during collaboration processes. Collaborators review the markup results created by others to produce a good design result on the Web. The use of XML files allows information sharing on the Web to be independent of the platform of the developed system. It is possible to diversify the information sharing capability among design collaborators. Validity and effectiveness of the developed system has been confirmed by case studies

  7. Internet-based dimensional verification system for reverse engineering processes

    Energy Technology Data Exchange (ETDEWEB)

    Song, In Ho [Ajou University, Suwon (Korea, Republic of); Kim, Kyung Don [Small Business Corporation, Suwon (Korea, Republic of); Chung, Sung Chong [Hanyang University, Seoul (Korea, Republic of)

    2008-07-15

    This paper proposes a design methodology for a Web-based collaborative system applicable to reverse engineering processes in a distributed environment. By using the developed system, design reviewers of new products are able to confirm geometric shapes, inspect dimensional information of products through measured point data, and exchange views with other design reviewers on the Web. In addition, it is applicable to verifying accuracy of production processes by manufacturing engineers. Functional requirements for designing this Web-based dimensional verification system are described in this paper. ActiveX-server architecture and OpenGL plug-in methods using ActiveX controls realize the proposed system. In the developed system, visualization and dimensional inspection of the measured point data are done directly on the Web: conversion of the point data into a CAD file or a VRML form is unnecessary. Dimensional verification results and design modification ideas are uploaded to markups and/or XML files during collaboration processes. Collaborators review the markup results created by others to produce a good design result on the Web. The use of XML files allows information sharing on the Web to be independent of the platform of the developed system. It is possible to diversify the information sharing capability among design collaborators. Validity and effectiveness of the developed system has been confirmed by case studies

  8. A method of knowledge base verification for nuclear power plant expert systems using extended Petri Nets

    International Nuclear Information System (INIS)

    Kwon, I. W.; Seong, P. H.

    1996-01-01

    The adoption of expert systems mainly as operator supporting systems is becoming increasingly popular as the control algorithms of system become more and more sophisticated and complicated. The verification phase of knowledge base is an important part for developing reliable expert systems, especially in nuclear industry. Although several strategies or tools have been developed to perform potential error checking, they often neglect the reliability of verification methods. Because a Petri net provides a uniform mathematical formalization of knowledge base, it has been employed for knowledge base verification. In this work, we devise and suggest an automated tool, called COKEP(Checker of Knowledge base using Extended Petri net), for detecting incorrectness, inconsistency, and incompleteness in a knowledge base. The scope of the verification problem is expended to chained errors, unlike previous studies that assume error incidence to be limited to rule pairs only. In addition, we consider certainty factor in checking, because most of knowledge bases have certainly factors. 8 refs,. 2 figs,. 4 tabs. (author)

  9. Towards a Framework for Modelling and Verification of Relay Interlocking Systems

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth

    2011-01-01

    This paper describes a framework currently under development for modelling, simulation, and verification of relay interlocking systems as used by the Danish railways. The framework is centred around a domain-specific language (DSL) for describing such systems, and provides (1) a graphical editor...

  10. Towards a Framework for Modelling and Verification of Relay Interlocking Systems

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth

    2010-01-01

    This paper describes a framework currently under development for modelling, simulation, and verification of relay interlocking systems as used by the Danish railways. The framework is centred around a domain-specific language (DSL) for describing such systems, and provides (1) a graphical editor ...

  11. ATLANTIDES: An Architecture for Alert Verification in Network Intrusion Detection Systems

    NARCIS (Netherlands)

    Bolzoni, D.; Crispo, Bruno; Etalle, Sandro

    2007-01-01

    We present an architecture designed for alert verification (i.e., to reduce false positives) in network intrusion-detection systems. Our technique is based on a systematic (and automatic) anomaly-based analysis of the system output, which provides useful context information regarding the network

  12. A Survey on Formal Verification Techniques for Safety-Critical Systems-on-Chip

    Directory of Open Access Journals (Sweden)

    Tomás Grimm

    2018-05-01

    Full Text Available The high degree of miniaturization in the electronics industry has been, for several years, a driver to push embedded systems to different fields and applications. One example is safety-critical systems, where the compactness in the form factor helps to reduce the costs and allows for the implementation of new techniques. The automotive industry is a great example of a safety-critical area with a great rise in the adoption of microelectronics. With it came the creation of the ISO 26262 standard with the goal of guaranteeing a high level of dependability in the designs. Other areas in the safety-critical applications domain have similar standards. However, these standards are mostly guidelines to make sure that designs reach the desired dependability level without explicit instructions. In the end, the success of the design to fulfill the standard is the result of a thorough verification process. Naturally, the goal of any verification team dealing with such important designs is complete coverage as well as standards conformity, but as these are complex hardware, complete functional verification is a difficult task. From the several techniques that exist to verify hardware, where each has its pros and cons, we studied six well-established in academia and in industry. We can divide them into two categories: simulation, which needs extremely large amounts of time, and formal verification, which needs unrealistic amounts of resources. Therefore, we conclude that a hybrid approach offers the best balance between simulation (time and formal verification (resources.

  13. Waste Information Data System user guide

    International Nuclear Information System (INIS)

    Dietz, L.A.

    1996-09-01

    The Waste Information Data System (also known as the Environmental Sites Database) is a computerized system that provides a traceable source of information about environmental waste sites at the U.S. Department of Energy's Hanford Site in Richland, Washington. The system includes discovery, rejected, and accepted waste sites. The purpose of the system is to assist long-range waste management and environmental restoration planning by providing validated and reliable information about waste sites. The system is used to track site investigation, remediation, and closure-action activities

  14. Formal Development and Verification of Railway Control Systems - In the context of ERTMS/ETCS Level 2

    DEFF Research Database (Denmark)

    Vu, Linh Hong

    This dissertation presents a holistic, formal method for efficient modelling and verification of safety-critical railway control systems that have product line characteristics, i.e., each individual system is constructed by instantiating common generic applications with concrete configuration dat...... standardized railway control systems ERTMS/ETCS Level 2. Experiments showed that the method can be used for specification, verification and validation of systems of industrial size....

  15. Remaining Sites Verification Package for the 100-F-26:10, 1607-F3 Sanitary Sewer Pipelines (182-F, 183-F, and 151-F Sanitary Sewer Lines), Waste Site Reclassification Form 2007-028

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2007-12-03

    The 100-F-26:10 waste site includes sanitary sewer lines that serviced the former 182-F, 183-F, and 151-F Buildings. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  16. Tank waste remediation system dangerous waste training plan

    International Nuclear Information System (INIS)

    POHTO, R.E.

    1999-01-01

    This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by Lockheed Martin Hanford Corporation (LMHC) Tank Waste Remediation System (TWRS) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units operated by TWRS are: the Double-Shell Tank (DST) System (including 204-AR Waste Transfer Building), the 600 Area Purgewater Storage and the Effluent Treatment Facility. TSD Units undergoing closure are: the Single-Shell Tank (SST) System, 207-A South Retention Basin, and the 216-B-63 Trench

  17. An Improved Constraint-Based System for the Verification of Security Protocols

    NARCIS (Netherlands)

    Corin, R.J.; Etalle, Sandro

    We propose a constraint-based system for the verification of security protocols that improves upon the one developed by Millen and Shmatikov [30]. Our system features (1) a significantly more efficient implementation, (2) a monotonic behavior, which also allows to detect flaws associated to partial

  18. An Improved Constraint-based system for the verification of security protocols

    NARCIS (Netherlands)

    Corin, R.J.; Etalle, Sandro; Hermenegildo, Manuel V.; Puebla, German

    We propose a constraint-based system for the verification of security protocols that improves upon the one developed by Millen and Shmatikov. Our system features (1) a significantly more efficient implementation, (2) a monotonic behavior, which also allows to detect aws associated to partial runs

  19. Cleanup Verification Package for the 100-F-20, Pacific Northwest Laboratory Parallel Pits

    International Nuclear Information System (INIS)

    Appel, M.J.

    2007-01-01

    This cleanup verification package documents completion of remedial action for the 100-F-20, Pacific Northwest Laboratory Parallel Pits waste site. This waste site consisted of two earthen trenches thought to have received both radioactive and nonradioactive material related to the 100-F Experimental Animal Farm

  20. Intelligent Information System for Waste Management; Jaetehuollon aelykaes tietojaerjestelmae iWaste

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, T. [Kuopio Univ. (Finland)

    2003-07-01

    'iWaste' is a project for developing and testing intelligent computational methods for more comprehensive waste management. Important issues are automated reporting, optimisation of waste collection, forecasting of waste formation, data handling of waste disposal sites and simulation and modelling of regional waste management. The main objective of the project is to identify and analyse known sources of information and to link them to the existing information processing systems in the field of waste management. Additionally, the goal is to identify and test functional elements that could be developed further to software products and services. The results of the project can be categorized into three sectors. Firstly, the guidelines for a comprehensive information system in waste management will be created. This includes the requirement specifications of different parties, definitions for the data exchange interfaces and an architectural plan for software products capable of co-operative processing. Secondly, the central parts of the intelligent information system will be piloted using the research database collected in the early stage of the project. The main topics investigated are data quality, the use of Geographical Information Systems (GIS), automated reporting, optimisation of waste collection and forecasting of waste formation. Additionally, the pilot information system can be utilized in derivative projects to speed up the starting phases of them. This makes it possible to create persistent development of waste management information systems both academically and commercially. (orig.)

  1. Cleanup Verification Package for the 118-F-6 Burial Ground

    International Nuclear Information System (INIS)

    Sulloway, H.M.

    2008-01-01

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car

  2. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  3. 1995 Baseline solid waste management system description

    International Nuclear Information System (INIS)

    Anderson, G.S.; Konynenbelt, H.S.

    1995-09-01

    This provides a detailed solid waste system description that documents the treatment, storage, and disposal (TSD) strategy for managing Hanford's solid low-level waste, low-level mixed waste, transuranic and transuranic mixed waste, and greater-than-Class III waste. This system description is intended for use by managers of the solid waste program, facility and system planners, as well as system modelers. The system description identifies the TSD facilities that constitute the solid waste system and defines these facilities' interfaces, schedules, and capacities. It also provides the strategy for treating each of the waste streams generated or received by the Hanford Site from generation or receipt through final destination

  4. Remaining Sites Verification Package for the 126-B-3, 184-B Coal Pit Dumping Area, Waste Site Reclassification Form 2005-028

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-08-07

    The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition operations in the 1970s, the site was used for disposal of demolition debris from 100-B/C Area facilities. The site has been remediated by removing debris and contaminated soils. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  5. Melting characteristics of a plasma torch melter according to the waste feeding method

    International Nuclear Information System (INIS)

    Kim, T. W.; Choi, J. R.; Park, S. C.; Lu, C. S.; Park, J. K.; Hwang, T. W.; Shin, S. W.

    2001-01-01

    By using a batch type plasma torch melting system, continuous feeding and melting tests of non-combustible waste were executed. Using the results, the establishment of a heat transfer model and its verification were executed; the characteristics of the molten slag, exhaust gas, fly dust, volatilization of Cs, and leaching of slag were analyzed. In order to establish the heat transfer mode, the followings were considered; the electrical energy supplied to the plasma torch, the absorbed energy to the plasma torch for generating the plasma gas, the absorbed energy to the cooling water of the plasma torch, the energy supplied to the melter from the plasma gas by radiant heat, the energy loss through the exhaust gas, the waste melting energy, and the heating energy of an inner crucible and the melter. The concrete and soil were melted for the verification of the model. The waste was fed through waste feeder by the amount of 0.5kg or 1kg that was calculated by using the model. The experiment for the verification resulted in that the model was fitted well until the melter was heated sufficiently. If the electrical energy of 128kW were supplied to the plasma torch, energy balance of the plasma melting system was calculated with the model: the absorbed energy to the plasma torch for generating the plasma gas (27kW), the absorbed energy to the cooling water of the plasma torch (0∼ 36kW), the energy loss through the exhaust gas (5 ∼ 8kW), the waste melting energy (14kW), and the heating energy of an inner crucible and the melter (82 ∼ 43kW)

  6. Embedded software verification and debugging

    CERN Document Server

    Winterholer, Markus

    2017-01-01

    This book provides comprehensive coverage of verification and debugging techniques for embedded software, which is frequently used in safety critical applications (e.g., automotive), where failures are unacceptable. Since the verification of complex systems needs to encompass the verification of both hardware and embedded software modules, this book focuses on verification and debugging approaches for embedded software with hardware dependencies. Coverage includes the entire flow of design, verification and debugging of embedded software and all key approaches to debugging, dynamic, static, and hybrid verification. This book discusses the current, industrial embedded software verification flow, as well as emerging trends with focus on formal and hybrid verification and debugging approaches. Includes in a single source the entire flow of design, verification and debugging of embedded software; Addresses the main techniques that are currently being used in the industry for assuring the quality of embedded softw...

  7. A hardware-software system for the automation of verification and calibration of oil metering units secondary equipment

    Science.gov (United States)

    Boyarnikov, A. V.; Boyarnikova, L. V.; Kozhushko, A. A.; Sekachev, A. F.

    2017-08-01

    In the article the process of verification (calibration) of oil metering units secondary equipment is considered. The purpose of the work is to increase the reliability and reduce the complexity of this process by developing a software and hardware system that provides automated verification and calibration. The hardware part of this complex carries out the commutation of the measuring channels of the verified controller and the reference channels of the calibrator in accordance with the introduced algorithm. The developed software allows controlling the commutation of channels, setting values on the calibrator, reading the measured data from the controller, calculating errors and compiling protocols. This system can be used for checking the controllers of the secondary equipment of the oil metering units in the automatic verification mode (with the open communication protocol) or in the semi-automatic verification mode (without it). The peculiar feature of the approach used is the development of a universal signal switch operating under software control, which can be configured for various verification methods (calibration), which allows to cover the entire range of controllers of metering units secondary equipment. The use of automatic verification with the help of a hardware and software system allows to shorten the verification time by 5-10 times and to increase the reliability of measurements, excluding the influence of the human factor.

  8. Formal Verification Method for Configuration of Integrated Modular Avionics System Using MARTE

    Directory of Open Access Journals (Sweden)

    Lisong Wang

    2018-01-01

    Full Text Available The configuration information of Integrated Modular Avionics (IMA system includes almost all details of whole system architecture, which is used to configure the hardware interfaces, operating system, and interactions among applications to make an IMA system work correctly and reliably. It is very important to ensure the correctness and integrity of the configuration in the IMA system design phase. In this paper, we focus on modelling and verification of configuration information of IMA/ARINC653 system based on MARTE (Modelling and Analysis for Real-time and Embedded Systems. Firstly, we define semantic mapping from key concepts of configuration (such as modules, partitions, memory, process, and communications to components of MARTE element and propose a method for model transformation between XML-formatted configuration information and MARTE models. Then we present a formal verification framework for ARINC653 system configuration based on theorem proof techniques, including construction of corresponding REAL theorems according to the semantics of those key components of configuration information and formal verification of theorems for the properties of IMA, such as time constraints, spatial isolation, and health monitoring. After that, a special issue of schedulability analysis of ARINC653 system is studied. We design a hierarchical scheduling strategy with consideration of characters of the ARINC653 system, and a scheduling analyzer MAST-2 is used to implement hierarchical schedule analysis. Lastly, we design a prototype tool, called Configuration Checker for ARINC653 (CC653, and two case studies show that the methods proposed in this paper are feasible and efficient.

  9. A new verification film system for routine quality control of radiation fields: Kodak EC-L.

    Science.gov (United States)

    Hermann, A; Bratengeier, K; Priske, A; Flentje, M

    2000-06-01

    The use of modern irradiation techniques requires better verification films for determining set-up deviations and patient movements during the course of radiation treatment. This is an investigation of the image quality and time requirement of a new verification film system compared to a conventional portal film system. For conventional verifications we used Agfa Curix HT 1000 films which were compared to the new Kodak EC-L film system. 344 Agfa Curix HT 1000 and 381 Kodak EC-L portal films of different tumor sites (prostate, rectum, head and neck) were visually judged on a light box by 2 experienced physicians. Subjective judgement of image quality, masking of films and time requirement were checked. In this investigation 68% of 175 Kodak EC-L ap/pa-films were judged "good", only 18% were classified "moderate" or "poor" 14%, but only 22% of 173 conventional ap/pa verification films (Agfa Curix HT 1000) were judged to be "good". The image quality, detail perception and time required for film inspection of the new Kodak EC-L film system was significantly improved when compared with standard portal films. They could be read more accurately and the detection of set-up deviation was facilitated.

  10. Environmental remediation of high-level nuclear waste in geological repository. Modified computer code creates ultimate benchmark in natural systems

    International Nuclear Information System (INIS)

    Peter, Geoffrey J.

    2011-01-01

    Isolation of high-level nuclear waste in permanent geological repositories has been a major concern for over 30 years due to the migration of dissolved radio nuclides reaching the water table (10,000-year compliance period) as water moves through the repository and the surrounding area. Repositories based on mathematical models allow for long-term geological phenomena and involve many approximations; however, experimental verification of long-term processes is impossible. Countries must determine if geological disposal is adequate for permanent storage. Many countries have extensively studied different aspects of safely confining the highly radioactive waste in an underground repository based on the unique geological composition at their selected repository location. This paper discusses two computer codes developed by various countries to study the coupled thermal, mechanical, and chemical process in these environments, and the migration of radionuclide. Further, this paper presents the results of a case study of the Magma-hydrothermal (MH) computer code, modified by the author, applied to nuclear waste repository analysis. The MH code verified by simulating natural systems thus, creating the ultimate benchmark. This approach based on processes similar to those expected near waste repositories currently occurring in natural systems. (author)

  11. Data-driven property verification of grey-box systems by Bayesian experiment design

    NARCIS (Netherlands)

    Haesaert, S.; Van den Hof, P.M.J.; Abate, A.

    2015-01-01

    A measurement-based statistical verification approach is developed for systems with partly unknown dynamics. These grey-box systems are subject to identification experiments which, new in this contribution, enable accepting or rejecting system properties expressed in a linear-time logic. We employ a

  12. Validation, verification and evaluation of a Train to Train Distance Measurement System by means of Colored Petri Nets

    International Nuclear Information System (INIS)

    Song, Haifeng; Liu, Jieyu; Schnieder, Eckehard

    2017-01-01

    Validation, verification and evaluation are necessary processes to assure the safety and functionality of a system before its application in practice. This paper presents a Train to Train Distance Measurement System (TTDMS), which can provide distance information independently from existing onboard equipment. Afterwards, we proposed a new process using Colored Petri Nets to verify the TTDMS system functional safety, as well as to evaluate the system performance. Three main contributions are carried out in the paper: Firstly, this paper proposes a formalized TTDMS model, and the model correctness is validated using state space analysis and simulation-based verification. Secondly, corresponding checking queries are proposed for the purpose of functional safety verification. Further, the TTDMS performance is evaluated by applying parameters in the formal model. Thirdly, the reliability of a functional prototype TTDMS is estimated. It is found that the procedure can cooperate with the system development, and both formal and simulation-based verifications are performed. Using our process to evaluate and verify a system is easier to read and more reliable compared to executable code and mathematical methods. - Highlights: • A new Train to Train Distance Measurement System. • New approach verifying system functional safety and evaluating system performance by means of CPN. • System formalization using the system property concept. • Verification of system functional safety using state space analysis. • Evaluation of system performance applying simulation-based analysis.

  13. Verification and validation benchmarks

    International Nuclear Information System (INIS)

    Oberkampf, William Louis; Trucano, Timothy Guy

    2007-01-01

    Verification and validation (V and V) are the primary means to assess the accuracy and reliability of computational simulations. V and V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V and V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the

  14. Verification and validation benchmarks

    International Nuclear Information System (INIS)

    Oberkampf, William L.; Trucano, Timothy G.

    2008-01-01

    Verification and validation (V and V) are the primary means to assess the accuracy and reliability of computational simulations. V and V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V and V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the

  15. Remaining Sites Verification Package for the 100-F-26:12, 1.8-m (72-in.) Main Process Sewer Pipeline. Attachment to Waste Site Reclassification Form 2007-034

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  16. Waste Information Management System with 2012-13 Waste Streams - 13095

    International Nuclear Information System (INIS)

    Upadhyay, H.; Quintero, W.; Lagos, L.; Shoffner, P.; Roelant, D.

    2013-01-01

    The Waste Information Management System (WIMS) 2012-13 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

  17. Waste Information Management System with 2012-13 Waste Streams - 13095

    Energy Technology Data Exchange (ETDEWEB)

    Upadhyay, H.; Quintero, W.; Lagos, L.; Shoffner, P.; Roelant, D. [Applied Research Center, Florida International University, 10555 West Flagler Street, Suite 2100, Miami, FL 33174 (United States)

    2013-07-01

    The Waste Information Management System (WIMS) 2012-13 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

  18. Improved verification methods for safeguards verifications at enrichment plants

    International Nuclear Information System (INIS)

    Lebrun, A.; Kane, S. C.; Bourva, L.; Poirier, S.; Loghin, N. E.; Langlands, D.

    2009-01-01

    The International Atomic Energy Agency (IAEA) has initiated a coordinated research and development programme to improve its verification methods and equipment applicable to enrichment plants. The programme entails several individual projects to meet the objectives of the IAEA Safeguards Model Approach for Gas Centrifuge Enrichment Plants updated in 2006. Upgrades of verification methods to confirm the absence of HEU (highly enriched uranium) production have been initiated and, in particular, the Cascade Header Enrichment Monitor (CHEM) has been redesigned to reduce its weight and incorporate an electrically cooled germanium detector. Such detectors are also introduced to improve the attended verification of UF 6 cylinders for the verification of the material balance. Data sharing of authenticated operator weighing systems such as accountancy scales and process load cells is also investigated as a cost efficient and an effective safeguards measure combined with unannounced inspections, surveillance and non-destructive assay (NDA) measurement. (authors)

  19. Improved verification methods for safeguards verifications at enrichment plants

    Energy Technology Data Exchange (ETDEWEB)

    Lebrun, A.; Kane, S. C.; Bourva, L.; Poirier, S.; Loghin, N. E.; Langlands, D. [Department of Safeguards, International Atomic Energy Agency, Wagramer Strasse 5, A1400 Vienna (Austria)

    2009-07-01

    The International Atomic Energy Agency (IAEA) has initiated a coordinated research and development programme to improve its verification methods and equipment applicable to enrichment plants. The programme entails several individual projects to meet the objectives of the IAEA Safeguards Model Approach for Gas Centrifuge Enrichment Plants updated in 2006. Upgrades of verification methods to confirm the absence of HEU (highly enriched uranium) production have been initiated and, in particular, the Cascade Header Enrichment Monitor (CHEM) has been redesigned to reduce its weight and incorporate an electrically cooled germanium detector. Such detectors are also introduced to improve the attended verification of UF{sub 6} cylinders for the verification of the material balance. Data sharing of authenticated operator weighing systems such as accountancy scales and process load cells is also investigated as a cost efficient and an effective safeguards measure combined with unannounced inspections, surveillance and non-destructive assay (NDA) measurement. (authors)

  20. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  1. FIR signature verification system characterizing dynamics of handwriting features

    Science.gov (United States)

    Thumwarin, Pitak; Pernwong, Jitawat; Matsuura, Takenobu

    2013-12-01

    This paper proposes an online signature verification method based on the finite impulse response (FIR) system characterizing time-frequency characteristics of dynamic handwriting features. First, the barycenter determined from both the center point of signature and two adjacent pen-point positions in the signing process, instead of one pen-point position, is used to reduce the fluctuation of handwriting motion. In this paper, among the available dynamic handwriting features, motion pressure and area pressure are employed to investigate handwriting behavior. Thus, the stable dynamic handwriting features can be described by the relation of the time-frequency characteristics of the dynamic handwriting features. In this study, the aforesaid relation can be represented by the FIR system with the wavelet coefficients of the dynamic handwriting features as both input and output of the system. The impulse response of the FIR system is used as the individual feature for a particular signature. In short, the signature can be verified by evaluating the difference between the impulse responses of the FIR systems for a reference signature and the signature to be verified. The signature verification experiments in this paper were conducted using the SUBCORPUS MCYT-100 signature database consisting of 5,000 signatures from 100 signers. The proposed method yielded equal error rate (EER) of 3.21% on skilled forgeries.

  2. A Scalable Approach for Hardware Semiformal Verification

    OpenAIRE

    Grimm, Tomas; Lettnin, Djones; Hübner, Michael

    2018-01-01

    The current verification flow of complex systems uses different engines synergistically: virtual prototyping, formal verification, simulation, emulation and FPGA prototyping. However, none is able to verify a complete architecture. Furthermore, hybrid approaches aiming at complete verification use techniques that lower the overall complexity by increasing the abstraction level. This work focuses on the verification of complex systems at the RT level to handle the hardware peculiarities. Our r...

  3. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT, SWINE WASTE ELECTRIC POWER AND HEAT PRODUCTION--MARTIN MACHINERY INTERNAL COMBUSTION ENGINE

    Science.gov (United States)

    Under EPA’s Environmental Technology Verification program, which provides objective and scientific third party analysis of new technology that can benefit the environment, a combined heat and power system designed by Martin Machinery was evaluated. This paper provides test result...

  4. Waste management - textbook for secondary schools

    International Nuclear Information System (INIS)

    Chmielewska, E.; Kuruc, J.

    2010-09-01

    This text-book consist of five parts: (I) Waste management; (II) Solid waste management; (III) Recovery and recycling of secondary raw materials; (IV) Radioactive waste management; Examples of verification knowledge and testing of the secondary students through the worksheet. (V) Suggestions for leisure time activities. This text-book is assigned for high school students.

  5. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 D/F WASTE LINE REMOVAL, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2010-01-01

    Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 2; the D/F Waste Line removal at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed the final status survey (FSS) of the D/F Waste Line that provided the conduit for pumping waste from Building 750 to Building 801. Sample results have been submitted as required to demonstrate that the cleanup goals of 15 mrem/yr above background to a resident in 50 years have been met. Four rounds of sampling, from pre-excavation to final status survey (FSS), were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the US Departmental of Energy (DOE) to perform independent verifications of decontamination and decomissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task at the HFBR. ORISE together with DOE determined that a Type A verification of the D/F Waste Line was appropriate based on its method of construction and upon the minimal potential for residual radioactivity in the area. The removal of underground utilities is being performed in three stages in the process to decommission the HFBR facility and support structures. Phase 2 of this project included the grouting and removal of 1100 feet of 2-inch pipe and 640 feet of 4-inch pipe that served as the D/F Waste Line. Based on the pre-excavation sample results of the soil overburden, the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the BNL FSP and identified comments for consideration (ORISE 2010). BNL prepared a revised FSP that addressed each ORISE comment adequately (BNL 2010a). ORISE referred to the revised Phase 2 D/F Waste Line removal FSP FSS data to conduct the Type A verification and determine whether the intent odf

  6. Remaining Sites Verification Package for the 1607-B2 Septic System and 100-B-14:2 Sanitary Sewer System, Waste Site Reclassification Form 2004-006

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2007-03-21

    The 100-B-14:2 subsite encompasses the former sanitary sewer feeder lines associated with the 1607-B2 and 1607-B7 septic systems. Feeder lines associated with the 185/190-B building have also been identified as the 100-B-14:8 subsite, and feeder lines associated with the 1607-B7 septic system have also been identified as the 100-B-14:9 subsite. These two subsites have been administratively cancelled to resolve the redundancy. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  7. General procedure to characterize hazardous waste contaminated with radionuclides

    International Nuclear Information System (INIS)

    Vokal, A.; Svoboda, K.; Necasova, M.

    2002-04-01

    The report is structured as follows: Overview of current status of characterization of hazardous wastes contaminated with radionuclides (HWCTR) in the Czech Republic (Legislative aspects; Categorization of HWCwR; Overview of HWCwR emerging from workplaces handling ionizing radiation sources; Mixed waste management in the Czech Republic); General procedure to characterized wastes of the HWCwR type (Information needed from the waste producer; Waste analysis plan - description of waste treatment facilities, verification of wastes, selection of waste parameters followed, selection of sampling method, selection of test methods, selection of frequency of analyses; Radiation protection plan; Non-destructive methods of verification of waste - radiography/tomography, dosimetric inspection, measuring instrumentation, methods usable for the determination of volume and surface activities of materials; Non-destructive invasive methods - internal pressure measurement and gas analysis, endoscopic examination, visual inspection; Destructive methods - sampling, current equipment at Nuclear Research Institute Rez; Identification of hazardous components in waste - chemical screening of mixed wastes; Assessment of immobilization waste matrices; Assessment of packaging; Safety analyses; QA and QC). (P.A.)

  8. Waste management system alternatives for treatment of wastes from spent fuel reprocessing

    International Nuclear Information System (INIS)

    McKee, R.W.; Swanson, J.L.; Daling, P.M.

    1986-09-01

    This study was performed to help identify a preferred TRU waste treatment alternative for reprocessing wastes with respect to waste form performance in a geologic repository, near-term waste management system risks, and minimum waste management system costs. The results were intended for use in developing TRU waste acceptance requirements that may be needed to meet regulatory requirements for disposal of TRU wastes in a geologic repository. The waste management system components included in this analysis are waste treatment and packaging, transportation, and disposal. The major features of the TRU waste treatment alternatives examined here include: (1) packaging (as-produced) without treatment (PWOT); (2) compaction of hulls and other compactable wastes; (3) incineration of combustibles with cementation of the ash plus compaction of hulls and filters; (4) melting of hulls and failed equipment plus incineration of combustibles with vitrification of the ash along with the HLW; (5a) decontamination of hulls and failed equipment to produce LLW plus incineration and incorporation of ash and other inert wastes into HLW glass; and (5b) variation of this fifth treatment alternative in which the incineration ash is incorporated into a separate TRU waste glass. The six alternative processing system concepts provide progressively increasing levels of TRU waste consolidation and TRU waste form integrity. Vitrification of HLW and intermediate-level liquid wastes (ILLW) was assumed in all cases

  9. Transport concept of new waste management system (inner packaging system)

    International Nuclear Information System (INIS)

    Hakozaki, K.; Wada, R.

    2004-01-01

    Kobe Steel, Ltd. (KSL) and Transnuclear Tokyo (TNT) have jointly developed a new waste management system concept (called ''Inner packaging system'') for high dose rate wastes generated from nuclear power plants under cooperation with Tokyo Electric Power Company (TEPCO). The inner packaging system is designed as a total management system dedicated to the wastes from nuclear plants in Japan, covering from the wastes conditioning in power plants up to the disposal in final repository. This paper presents the new waste management system concept

  10. Decision and systems analysis for underground storage tank waste retrieval systems and tank waste remediation system

    International Nuclear Information System (INIS)

    Bitz, D.A.; Berry, D.L.; Jardine, L.J.

    1994-03-01

    Hanford's underground tanks (USTs) pose one of the most challenging hazardous and radioactive waste problems for the Department of Energy (DOE). Numerous schemes have been proposed for removing the waste from the USTs, but the technology options for doing this are largely unproven. To help assess the options, an Independent Review Group (IRG) was established to conduct a broad review of retrieval systems and the tank waste remediation system. The IRG consisted of the authors of this report

  11. CTBT Integrated Verification System Evaluation Model

    Energy Technology Data Exchange (ETDEWEB)

    Edenburn, M.W.; Bunting, M.L.; Payne, A.C. Jr.

    1997-10-01

    Sandia National Laboratories has developed a computer based model called IVSEM (Integrated Verification System Evaluation Model) to estimate the performance of a nuclear detonation monitoring system. The IVSEM project was initiated in June 1994, by Sandia`s Monitoring Systems and Technology Center and has been funded by the US Department of Energy`s Office of Nonproliferation and National Security (DOE/NN). IVSEM is a simple, top-level, modeling tool which estimates the performance of a Comprehensive Nuclear Test Ban Treaty (CTBT) monitoring system and can help explore the impact of various sensor system concepts and technology advancements on CTBT monitoring. One of IVSEM`s unique features is that it integrates results from the various CTBT sensor technologies (seismic, infrasound, radionuclide, and hydroacoustic) and allows the user to investigate synergy among the technologies. Specifically, IVSEM estimates the detection effectiveness (probability of detection) and location accuracy of the integrated system and of each technology subsystem individually. The model attempts to accurately estimate the monitoring system`s performance at medium interfaces (air-land, air-water) and for some evasive testing methods such as seismic decoupling. This report describes version 1.2 of IVSEM.

  12. Entropy Measurement for Biometric Verification Systems.

    Science.gov (United States)

    Lim, Meng-Hui; Yuen, Pong C

    2016-05-01

    Biometric verification systems are designed to accept multiple similar biometric measurements per user due to inherent intrauser variations in the biometric data. This is important to preserve reasonable acceptance rate of genuine queries and the overall feasibility of the recognition system. However, such acceptance of multiple similar measurements decreases the imposter's difficulty of obtaining a system-acceptable measurement, thus resulting in a degraded security level. This deteriorated security needs to be measurable to provide truthful security assurance to the users. Entropy is a standard measure of security. However, the entropy formula is applicable only when there is a single acceptable possibility. In this paper, we develop an entropy-measuring model for biometric systems that accepts multiple similar measurements per user. Based on the idea of guessing entropy, the proposed model quantifies biometric system security in terms of adversarial guessing effort for two practical attacks. Excellent agreement between analytic and experimental simulation-based measurement results on a synthetic and a benchmark face dataset justify the correctness of our model and thus the feasibility of the proposed entropy-measuring approach.

  13. Sensitivity Verification of PWR Monitoring System Using Neuro-Expert For LOCA Detection

    International Nuclear Information System (INIS)

    Muhammad Subekti

    2009-01-01

    Sensitivity Verification of PWR Monitoring System Using Neuro-Expert For LOCA Detection. The present research was done for verification of previous developed method on Loss of Coolant Accident (LOCA) detection and perform simulations for knowing the sensitivity of the PWR monitoring system that applied neuro-expert method. The previous research continuing on present research, has developed and has tested the neuro-expert method for several anomaly detections in Nuclear Power Plant (NPP) typed Pressurized Water Reactor (PWR). Neuro-expert can detect the LOCA anomaly with sensitivity of primary coolant leakage of 7 gallon/min and the conventional method could not detect the primary coolant leakage of 30 gallon/min. Neuro expert method detects significantly LOCA anomaly faster than conventional system in Surry-1 NPP as well so that the impact risk is reducible. (author)

  14. Development Concept of Guaranteed Verification Electric Power System Simulation Tools and Its Realization

    Directory of Open Access Journals (Sweden)

    Gusev Alexander

    2015-01-01

    Full Text Available The analysis of existing problem reliability and verification of widespread electric power systems (EPS simulation tools is presented in this article. Everything simulation tools are based on the using of numerical methods for ordinary differential equations. Described the concept of guaranteed verification EPS simulation tools and the structure of its realization are based using the Simulator having properties of continuous , without decomposition three-phase EPS simulation in real time and on an unlimited range with guaranteed accuracy. The information from the Simulator can be verified by using data only quasi-steady-state regime received from the SCADA and such Simulator can be applied as the standard model for verification any EPS simulation tools.

  15. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  16. Development of An Automatic Verification Program for Thermal-hydraulic System Codes

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. Y.; Ahn, K. T.; Ko, S. H.; Kim, Y. S.; Kim, D. W. [Pusan National University, Busan (Korea, Republic of); Suh, J. S.; Cho, Y. S.; Jeong, J. J. [System Engineering and Technology Co., Daejeon (Korea, Republic of)

    2012-05-15

    As a project activity of the capstone design competitive exhibition, supported by the Education Center for Green Industry-friendly Fusion Technology (GIFT), we have developed a computer program which can automatically perform non-regression test, which is needed repeatedly during a developmental process of a thermal-hydraulic system code, such as the SPACE code. A non-regression test (NRT) is an approach to software testing. The purpose of the non-regression testing is to verify whether, after updating a given software application (in this case, the code), previous software functions have not been compromised. The goal is to prevent software regression, whereby adding new features results in software bugs. As the NRT is performed repeatedly, a lot of time and human resources will be needed during the development period of a code. It may cause development period delay. To reduce the cost and the human resources and to prevent wasting time, non-regression tests need to be automatized. As a tool to develop an automatic verification program, we have used Visual Basic for Application (VBA). VBA is an implementation of Microsoft's event-driven programming language Visual Basic 6 and its associated integrated development environment, which are built into most Microsoft Office applications (In this case, Excel)

  17. Development of An Automatic Verification Program for Thermal-hydraulic System Codes

    International Nuclear Information System (INIS)

    Lee, J. Y.; Ahn, K. T.; Ko, S. H.; Kim, Y. S.; Kim, D. W.; Suh, J. S.; Cho, Y. S.; Jeong, J. J.

    2012-01-01

    As a project activity of the capstone design competitive exhibition, supported by the Education Center for Green Industry-friendly Fusion Technology (GIFT), we have developed a computer program which can automatically perform non-regression test, which is needed repeatedly during a developmental process of a thermal-hydraulic system code, such as the SPACE code. A non-regression test (NRT) is an approach to software testing. The purpose of the non-regression testing is to verify whether, after updating a given software application (in this case, the code), previous software functions have not been compromised. The goal is to prevent software regression, whereby adding new features results in software bugs. As the NRT is performed repeatedly, a lot of time and human resources will be needed during the development period of a code. It may cause development period delay. To reduce the cost and the human resources and to prevent wasting time, non-regression tests need to be automatized. As a tool to develop an automatic verification program, we have used Visual Basic for Application (VBA). VBA is an implementation of Microsoft's event-driven programming language Visual Basic 6 and its associated integrated development environment, which are built into most Microsoft Office applications (In this case, Excel)

  18. A new verification film system for routine quality control of radiation fields: Kodak EC-L

    International Nuclear Information System (INIS)

    Hermann, A.; Bratengeier, K.; Priske, A.; Flentje, M.

    2000-01-01

    Background: The use of modern irradiation techniques requires better verification films for determining set-up deviations and patient movements during the course of radiation treatment. This is an investigation of the image quality and time requirement of a new verification film system compared to a conventional portal film system. Material and Methods: For conventional verifications we used Agfa Curix HT 1000 films which were compared to the new Kodak EC-L film system. 344 Agfa Curix HT 1000 and 381 Kodak EC-L portal films of different tumor sites (prostate, rectum, head and neck) were visually judged on a light box by 2 experienced physicians. Subjective judgement of image quality, masking of films and time requirement were checked. Results: In this investigation 68% of 175 Kodak EC-L ap/pa-films were judged 'good', only 18% were classified 'moderate' or 'poor' 14%, but only 22% of 173 conventional ap/pa verification films (Agfa Curix HT 1000) were judged to be 'good'. Conclusions: The image quality, detail perception and time required for film inspection of the new Kodak EC-L film system was significantly improved when compared with standard portal films. They could be read more accurately and the detection of set-up deviation was facilitated. (orig.) [de

  19. Verification in the international treaty and expected its activities for FMCT

    International Nuclear Information System (INIS)

    Kikuchi, Masahiro

    1997-01-01

    Cold war had been finished and the international society was going to move detente. The mass destruction weapons decrease its object and they are going to be reduced or reversed. By change of the international conditions in the field of non-proliferation, it is necessary to the activities for decreasing atomic weapons and a countermeasure of diffusion of nuclear materials produced by waste and dissection of excess atomic weapon to other countries and stranger. We understand that non-proliferation means a countermeasure of decreasing nuclear weapon. So that the non-proliferation system should be regulated systematically in order to foresee the international tendency in the future and the verification activities to attain reliability assurance of international treaty for disarmament and non-proliferation. NPT reconsider congress decided to begin early negotiation of Fissile Material Cut-off Treaty (FMCT) in 1995. The functions, verification and expected activities of FMCT are discussed. (S.Y.)

  20. Safety verification of non-linear hybrid systems is quasi-decidable

    Czech Academy of Sciences Publication Activity Database

    Ratschan, Stefan

    2014-01-01

    Roč. 44, č. 1 (2014), s. 71-90 ISSN 0925-9856 R&D Projects: GA ČR GCP202/12/J060 Institutional support: RVO:67985807 Keywords : hybrid system s * safety verification * decidability * robustness Subject RIV: IN - Informatics, Computer Science Impact factor: 0.875, year: 2014

  1. Remaining Sites Verification Package for the 100-F-26:10, 1607-F3 Sanitary Sewer Pipelines (182-F, 183-F, and 151-F Sanitary Sewer Lines). Attachment to Waste Site Reclassification Form 2007-028

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2007-01-01

    The 100-F-26:10 waste site includes sanitary sewer lines that serviced the former 182-F, 183-F, and 151-F Buildings. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  2. Development of vitrified waste storage system

    International Nuclear Information System (INIS)

    Namiki, S.; Tani, Y.

    1993-01-01

    The authors have developed the radioactive waste vitrification technology and the vitrified waste storage technology. Regarding the vitrified waste storage system development, the authors have completed the design of two types of storage systems. One is a forced convection air cooling system, and the other is a natural convection air cooling system. They have carried out experiments and heat transfer analysis, seismic analysis, vitrified waste dropping and radiation shielding, etc. In this paper, the following three subjects, are discussed: the cooling air flow experiment, the wind effect experiment on the cooling air flow pattern, using a wind tunnel apparatus and the structural integrity evaluation on the dropping vitrified waste

  3. Remaining Sites Verification Package for the 1607-F7, 141-M Building Septic Tank. Attachment to Waste Site Reclassification Form 2006-040

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 1607-F7, 141-M Building Septic Tank waste site was a septic tank and drain field that received sanitary sewage from the former 141-M Building. Remedial action was performed in August and November 2005. The results of verification sampling demonstrate that residual contaminant concentrations support future unrestricted land uses that can be represented by a rural-residential scenario. These results also show that residual concentrations support unrestricted future use of shallow zone soil and that contaminant levels remaining in the soil are protective of groundwater and the Columbia River

  4. Design verification enhancement of field programmable gate array-based safety-critical I&C system of nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, Ibrahim [Department of Nuclear Engineering, Kyung Hee University, 1732 Deogyeong-daero, Giheung-gu, Yongin-si, Gyeonggi-do 17104 (Korea, Republic of); Jung, Jaecheon, E-mail: jcjung@kings.ac.kr [Department of Nuclear Power Plant Engineering, KEPCO International Nuclear Graduate School, 658-91 Haemaji-ro, Seosang-myeon, Ulju-gun, Ulsan 45014 (Korea, Republic of); Heo, Gyunyoung [Department of Nuclear Engineering, Kyung Hee University, 1732 Deogyeong-daero, Giheung-gu, Yongin-si, Gyeonggi-do 17104 (Korea, Republic of)

    2017-06-15

    Highlights: • An enhanced, systematic and integrated design verification approach is proposed for V&V of FPGA-based I&C system of NPP. • RPS bistable fixed setpoint trip algorithm is designed, analyzed, verified and discussed using the proposed approaches. • The application of integrated verification approach simultaneously verified the entire design modules. • The applicability of the proposed V&V facilitated the design verification processes. - Abstract: Safety-critical instrumentation and control (I&C) system in nuclear power plant (NPP) implemented on programmable logic controllers (PLCs) plays a vital role in safe operation of the plant. The challenges such as fast obsolescence, the vulnerability to cyber-attack, and other related issues of software systems have currently led to the consideration of field programmable gate arrays (FPGAs) as an alternative to PLCs because of their advantages and hardware related benefits. However, safety analysis for FPGA-based I&C systems, and verification and validation (V&V) assessments still remain important issues to be resolved, which are now become a global research point of interests. In this work, we proposed a systematic design and verification strategies from start to ready-to-use in form of model-based approaches for FPGA-based reactor protection system (RPS) that can lead to the enhancement of the design verification and validation processes. The proposed methodology stages are requirement analysis, enhanced functional flow block diagram (EFFBD) models, finite state machine with data path (FSMD) models, hardware description language (HDL) code development, and design verifications. The design verification stage includes unit test – Very high speed integrated circuit Hardware Description Language (VHDL) test and modified condition decision coverage (MC/DC) test, module test – MATLAB/Simulink Co-simulation test, and integration test – FPGA hardware test beds. To prove the adequacy of the proposed

  5. Design verification enhancement of field programmable gate array-based safety-critical I&C system of nuclear power plant

    International Nuclear Information System (INIS)

    Ahmed, Ibrahim; Jung, Jaecheon; Heo, Gyunyoung

    2017-01-01

    Highlights: • An enhanced, systematic and integrated design verification approach is proposed for V&V of FPGA-based I&C system of NPP. • RPS bistable fixed setpoint trip algorithm is designed, analyzed, verified and discussed using the proposed approaches. • The application of integrated verification approach simultaneously verified the entire design modules. • The applicability of the proposed V&V facilitated the design verification processes. - Abstract: Safety-critical instrumentation and control (I&C) system in nuclear power plant (NPP) implemented on programmable logic controllers (PLCs) plays a vital role in safe operation of the plant. The challenges such as fast obsolescence, the vulnerability to cyber-attack, and other related issues of software systems have currently led to the consideration of field programmable gate arrays (FPGAs) as an alternative to PLCs because of their advantages and hardware related benefits. However, safety analysis for FPGA-based I&C systems, and verification and validation (V&V) assessments still remain important issues to be resolved, which are now become a global research point of interests. In this work, we proposed a systematic design and verification strategies from start to ready-to-use in form of model-based approaches for FPGA-based reactor protection system (RPS) that can lead to the enhancement of the design verification and validation processes. The proposed methodology stages are requirement analysis, enhanced functional flow block diagram (EFFBD) models, finite state machine with data path (FSMD) models, hardware description language (HDL) code development, and design verifications. The design verification stage includes unit test – Very high speed integrated circuit Hardware Description Language (VHDL) test and modified condition decision coverage (MC/DC) test, module test – MATLAB/Simulink Co-simulation test, and integration test – FPGA hardware test beds. To prove the adequacy of the proposed

  6. Development and verification of Monte Carlo burnup calculation system

    International Nuclear Information System (INIS)

    Ando, Yoshihira; Yoshioka, Kenichi; Mitsuhashi, Ishi; Sakurada, Koichi; Sakurai, Shungo

    2003-01-01

    Monte Carlo burnup calculation code system has been developed to evaluate accurate various quantities required in the backend field. From the Actinide Research in a Nuclear Element (ARIANE) program, by using, the measured nuclide compositions of fuel rods in the fuel assemblies irradiated in the commercial Netherlands BWR, the analyses have been performed for the code system verification. The code system developed in this paper has been verified through analysis for MOX and UO2 fuel rods. This system enables to reduce large margin assumed in the present criticality analysis for LWR spent fuels. (J.P.N.)

  7. Verification and the safeguards legacy

    International Nuclear Information System (INIS)

    Perricos, Demetrius

    2001-01-01

    A number of inspection or monitoring systems throughout the world over the last decades have been structured drawing upon the IAEA experience of setting up and operating its safeguards system. The first global verification system was born with the creation of the IAEA safeguards system, about 35 years ago. With the conclusion of the NPT in 1968, inspections were to be performed under safeguards agreements, concluded directly between the IAEA and non-nuclear weapon states parties to the Treaty. The IAEA developed the safeguards system within the limitations reflected in the Blue Book (INFCIRC 153), such as limitations of routine access by the inspectors to 'strategic points', including 'key measurement points', and the focusing of verification on declared nuclear material in declared installations. The system, based as it was on nuclear material accountancy. It was expected to detect a diversion of nuclear material with a high probability and within a given time and therefore determine also that there had been no diversion of nuclear material from peaceful purposes. The most vital element of any verification system is the inspector. Technology can assist but cannot replace the inspector in the field. Their experience, knowledge, intuition and initiative are invaluable factors contributing to the success of any inspection regime. The IAEA inspectors are however not part of an international police force that will intervene to prevent a violation taking place. To be credible they should be technically qualified with substantial experience in industry or in research and development before they are recruited. An extensive training program has to make sure that the inspectors retain their professional capabilities and that it provides them with new skills. Over the years, the inspectors and through them the safeguards verification system gained experience in: organization and management of large teams; examination of records and evaluation of material balances

  8. A Formal Approach for the Construction and Verification of Railway Control Systems

    DEFF Research Database (Denmark)

    Haxthausen, Anne Elisabeth; Peleska, Jan; Kinder, Sebastian

    2011-01-01

    This paper describes a complete model-based development and verification approach for railway control systems. For each control system to be generated, the user makes a description of the application-specific parameters in a domain-specific language. This description is automatically transformed...

  9. WASTES: Waste System Transportation and Economic Simulation--Version 2:

    International Nuclear Information System (INIS)

    Sovers, R.A.; Shay, M.R.; Ouderkirk, S.J.; McNair, G.W.; Eagle, B.G.

    1988-02-01

    The Waste System Transportation and Economic Simulation (WASTES) Technical Reference Manual was written to describe and document the algorithms used within the WASTES model as implemented in Version 2.23. The manual will serve as a reference for users of the WASTES system. The intended audience for this manual are knowledgeable users of WASTES who have an interest in the underlying principles and algorithms used within the WASTES model. Each algorithm is described in nonprogrammers terminology, and the source and uncertainties of the constants in use by these algorithms are described. The manual also describes the general philosophy and rules used to: 1) determine the allocation and priority of spent fuel generation sources to facility destinations, 2) calculate transportation costs, and 3) estimate the cost of at-reactor ex-pool storage. A detailed description of the implementation of many of the algorithms is also included in the WASTES Programmers Reference Manual (Shay and Buxbaum 1986a). This manual is separated into sections based on the general usage of the algorithms being discussed. 8 refs., 14 figs., 2 tabs

  10. Verification of the 2.00 WAPPA-B [Waste Package Performance Assessment-B version] code

    International Nuclear Information System (INIS)

    Tylock, B.; Jansen, G.; Raines, G.E.

    1987-07-01

    The old version of the Waste Package Performance Assessment (WAPPA) code has been modified into a new code version, 2.00 WAPPA-B. The input files and the results for two benchmarks at repository conditions are fully documented in the appendixes of the EA reference report. The 2.00 WAPPA-B version of the code is suitable for computation of barrier failure due to uniform corrosion; however, an improved sub-version, 2.01 WAPPA-B, is recommended for general use due to minor errors found in 2.00 WAPPA-B during its verification procedures. The input files and input echoes have been modified to include behavior of both radionuclides and elements, but the 2.00 WAPPA-B version of the WAPPA code is not recommended for computation of radionuclide releases. The 2.00 WAPPA-B version computes only mass balances and the initial presence of radionuclides that can be released. Future code development in the 3.00 WAPPA-C version will include radionuclide release computations. 19 refs., 10 figs., 1 tab

  11. Remaining Sites Verification Package for the 100-F-33, 146-F Aquatic Biology Fish Ponds, Waste Site Reclassification Form 2006-021

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-08-25

    The 100-F-33, 146-F Aquatice Biology Fish Ponds waste site was an area with six small rectangular ponds and one large circular pond used to conduct tests on fish using various mixtures of river and reactor effluent water. The current site conditions achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification and applicable confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  12. A perspective of hazardous waste and mixed waste treatment technology at the Savannah River Site

    International Nuclear Information System (INIS)

    England, J.L.; Venkatesh, S.; Bailey, L.L.; Langton, C.A.; Hay, M.S.; Stevens, C.B.; Carroll, S.J.

    1991-01-01

    Treatment technologies for the preparation and treatment of heavy metal mixed wastes, contaminated soils, and mixed mercury wastes are being considered at the Savannah River Site (SRS), a DOE nuclear material processing facility operated by Westinghouse Savannah River Company (WSRC). The proposed treatment technologies to be included at the Hazardous Waste/Mixed Waste Treatment Building at SRS are based on the regulatory requirements, projected waste volumes, existing technology, cost effectiveness, and project schedule. Waste sorting and size reduction are the initial step in the treatment process. After sorting/size reduction the wastes would go to the next applicable treatment module. For solid heavy metal mixed wastes the proposed treatment is macroencapsulation using a thermoplastic polymer. This process reduces the leachability of hazardous constituents from the waste and allows easy verification of the coating integrity. Stabilization and solidification in a cement matrix will treat a wide variety of wastes (i.e. soils, decontamination water). Some pretreatments may be required (i.e. Ph adjustment) before stabilization. Other pretreatments such as soil washing can reduce the amount of waste to be stabilized. Radioactive contaminated mercury waste at the SRS comes in numerous forms (i.e. process equipment, soils, and lab waste) with the required treatment of high mercury wastes being roasting/retorting and recovery. Any unrecyclable radioactive contaminated elemental mercury would be amalgamated, utilizing a batch system, before disposal

  13. Comparative Analysys of Speech Parameters for the Design of Speaker Verification Systems

    National Research Council Canada - National Science Library

    Souza, A

    2001-01-01

    Speaker verification systems are basically composed of three stages: feature extraction, feature processing and comparison of the modified features from speaker voice and from the voice that should be...

  14. Enhancement of the use of digital mock-ups in the verification and validation process for ITER remote handling systems

    Energy Technology Data Exchange (ETDEWEB)

    Sibois, R., E-mail: romain.sibois@vtt.fi [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland); Salminen, K.; Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland); Mattila, J. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Määttä, T. [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland)

    2013-10-15

    Highlights: • Verification and validation process for ITER remote handling system. • Verification and validation framework for complex engineering systems. • Verification and validation roadmap for digital modelling phase. • Importance of the product life-cycle management in the verification and validation framework. -- Abstract: The paper is part of the EFDA's programme of European Goal Oriented Training programme on remote handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. This paper is written based on the results of a project “verification and validation (V and V) of ITER RH system using digital mock-ups (DMUs)”. The purpose of this project is to study efficient approach of using DMU for the V and V of the ITER RH system design utilizing a system engineering (SE) framework. This paper reviews the definitions of DMU and virtual prototype and overviews the current trends of using virtual prototyping in the industry during the early design phase. Based on the survey of best industrial practices, this paper proposes ways to improve the V and V process for ITER RH system utilizing DMUs.

  15. Technical safety requirements control level verification

    International Nuclear Information System (INIS)

    STEWART, J.L.

    1999-01-01

    A Technical Safety Requirement (TSR) control level verification process was developed for the Tank Waste Remediation System (TWRS) TSRs at the Hanford Site in Richland, WA, at the direction of the US. Department of Energy, Richland Operations Office (RL). The objective of the effort was to develop a process to ensure that the TWRS TSR controls are designated and managed at the appropriate levels as Safety Limits (SLs), Limiting Control Settings (LCSs), Limiting Conditions for Operation (LCOs), Administrative Controls (ACs), or Design Features. The TSR control level verification process was developed and implemented by a team of contractor personnel with the participation of Fluor Daniel Hanford, Inc. (FDH), the Project Hanford Management Contract (PHMC) integrating contractor, and RL representatives. The team was composed of individuals with the following experience base: nuclear safety analysis; licensing; nuclear industry and DOE-complex TSR preparation/review experience; tank farm operations; FDH policy and compliance; and RL-TWRS oversight. Each TSR control level designation was completed utilizing TSR control logic diagrams and TSR criteria checklists based on DOE Orders, Standards, Contractor TSR policy, and other guidance. The control logic diagrams and criteria checklists were reviewed and modified by team members during team meetings. The TSR control level verification process was used to systematically evaluate 12 LCOs, 22 AC programs, and approximately 100 program key elements identified in the TWRS TSR document. The verification of each TSR control required a team consensus. Based on the results of the process, refinements were identified and the TWRS TSRs were modified as appropriate. A final report documenting key assumptions and the control level designation for each TSR control was prepared and is maintained on file for future reference. The results of the process were used as a reference in the RL review of the final TWRS TSRs and control suite. RL

  16. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT: TRITON SYSTEMS, LLC SOLID BOWL CENTRIFUGE, MODEL TS-5000

    Science.gov (United States)

    Verification testing of the Triton Systems, LLC Solid Bowl Centrifuge Model TS-5000 (TS-5000) was conducted at the Lake Wheeler Road Field Laboratory Swine Educational Unit in Raleigh, North Carolina. The TS-5000 was 48" in diameter and 30" deep, with a bowl capacity of 16 ft3. ...

  17. Physical System Requirements: Transport Waste

    International Nuclear Information System (INIS)

    1992-04-01

    The Nuclear Waste Policy Act (NWPA) of 1982 assigned to the Department of Energy (DOE) the responsibility for managing the disposal of spent nuclear fuel and high-level radioactive waste and established the Office of Civilian Radioactive Waste Management (OCRWM) for that purpose. The Secretary of Energy, in his November 1989 report to Congress (DOE/RW-0247), announced three new initiatives for the conduct of the Civilian Radioactive Waste Management (CRWM) program. One of these initiatives was to establish improved management structure and procedures. In response, OCRWM performed a management study and the Director subsequently issued the Management Systems Improvement Strategy (MSIS) on August 10, 1990, calling for a rigorous implementation of systems engineering principles with a special emphasis on functional analysis. The functional analysis approach establishes a framework for integrating the program management efforts with the technical requirements analysis into a single, unified, and consistent program. This approach recognizes that just as the facilities and equipment comprising the physical waste management system must perform certain functions, so must certain programmatic and management functions be performed within the program in order to successfully bring the physical system into being. The objective of this document is to establish the essential functions, requirements, interfaces, and system architecture for the Transport Waste mission. Based upon the Nuclear Waste Policy Act, the mission of the Waste Transportation System is to transport SNF and/or HLW from the purchaser's/producer's facilities to, and between, NWMS facilities in a manner that protects the health and safety of the public and of workers and the quality of the environment makes effective use of financial and other resources, and to the fullest extent possible uses the private sector

  18. Verification of the safety communication protocol in train control system using colored Petri net

    International Nuclear Information System (INIS)

    Chen Lijie; Tang Tao; Zhao Xianqiong; Schnieder, Eckehard

    2012-01-01

    This paper deals with formal and simulation-based verification of the safety communication protocol in ETCS (European Train Control System). The safety communication protocol controls the establishment of safety connection between train and trackside. Because of its graphical user interface and modeling flexibility upon the changes in the system conditions, this paper proposes a composition Colored Petri Net (CPN) representation for both the logic and the timed model. The logic of the protocol is proved to be safe by means of state space analysis: the dead markings are correct; there are no dead transitions; being fair. Further analysis results have been obtained using formal and simulation-based verification approach. The timed models for the open transmit system and the application process are created for the purpose of performance analysis of the safety communication protocol. The models describe the procedure of data transmission and processing, and also provide relevant timed and stochastic factors, as well as time delay and lost packet, which may influence the time for establishment of safety connection of the protocol. Time for establishment of safety connection of the protocol in normal state is verified by formal verification, and then time for establishment of safety connection with different probability of lost packet is simulated. After verification it is found that the time for establishment of safety connection of the safety communication protocol satisfies the safety requirements.

  19. 1993 baseline solid waste management system description

    International Nuclear Information System (INIS)

    Armacost, L.L.; Fowler, R.A.; Konynenbelt, H.S.

    1994-02-01

    Pacific Northwest Laboratory has prepared this report under the direction of Westinghouse Hanford Company. The report provides an integrated description of the system planned for managing Hanford's solid low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. The primary purpose of this document is to illustrate a collective view of the key functions planned at the Hanford Site to handle existing waste inventories, as well as solid wastes that will be generated in the future. By viewing this system as a whole rather than as individual projects, key facility interactions and requirements are identified and a better understanding of the overall system may be gained. The system is described so as to form a basis for modeling the system at various levels of detail. Model results provide insight into issues such as facility capacity requirements, alternative system operating strategies, and impacts of system changes (ie., startup dates). This description of the planned Hanford solid waste processing system: defines a baseline system configuration; identifies the entering waste streams to be managed within the system; identifies basic system functions and waste flows; and highlights system constraints. This system description will evolve and be revised as issues are resolved, planning decisions are made, additional data are collected, and assumptions are tested and changed. Out of necessity, this document will also be revised and updated so that a documented system description, which reflects current system planning, is always available for use by engineers and managers. It does not provide any results generated from the many alternatives that will be modeled in the course of analyzing solid waste disposal options; such results will be provided in separate documents

  20. Formal modelling and verification of interlocking systems featuring sequential release

    DEFF Research Database (Denmark)

    Vu, Linh Hong; Haxthausen, Anne Elisabeth; Peleska, Jan

    2017-01-01

    In this article, we present a method and an associated toolchain for the formal verification of the new Danish railway interlocking systems that are compatible with the European Train Control System (ETCS) Level 2. We have made a generic and reconfigurable model of the system behaviour and generic...... safety properties. This model accommodates sequential release - a feature in the new Danish interlocking systems. To verify the safety of an interlocking system, first a domain-specific description of interlocking configuration data is constructed and validated. Then the generic model and safety...

  1. Mobile Pit verification system design based on passive special nuclear material verification in weapons storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Paul, J. N.; Chin, M. R.; Sjoden, G. E. [Nuclear and Radiological Engineering Program, George W. Woodruff School of Mechanical Engineering, Georgia Institute of Technology, 770 State St, Atlanta, GA 30332-0745 (United States)

    2013-07-01

    A mobile 'drive by' passive radiation detection system to be applied in special nuclear materials (SNM) storage facilities for validation and compliance purposes has been designed through the use of computational modeling and new radiation detection methods. This project was the result of work over a 1 year period to create optimal design specifications to include creation of 3D models using both Monte Carlo and deterministic codes to characterize the gamma and neutron leakage out each surface of SNM-bearing canisters. Results were compared and agreement was demonstrated between both models. Container leakages were then used to determine the expected reaction rates using transport theory in the detectors when placed at varying distances from the can. A 'typical' background signature was incorporated to determine the minimum signatures versus the probability of detection to evaluate moving source protocols with collimation. This established the criteria for verification of source presence and time gating at a given vehicle speed. New methods for the passive detection of SNM were employed and shown to give reliable identification of age and material for highly enriched uranium (HEU) and weapons grade plutonium (WGPu). The finalized 'Mobile Pit Verification System' (MPVS) design demonstrated that a 'drive-by' detection system, collimated and operating at nominally 2 mph, is capable of rapidly verifying each and every weapon pit stored in regularly spaced, shelved storage containers, using completely passive gamma and neutron signatures for HEU and WGPu. This system is ready for real evaluation to demonstrate passive total material accountability in storage facilities. (authors)

  2. SU-F-T-440: The Feasibility Research of Checking Cervical Cancer IMRT Pre- Treatment Dose Verification by Automated Treatment Planning Verification System

    Energy Technology Data Exchange (ETDEWEB)

    Liu, X; Yin, Y; Lin, X [Shandong Cancer Hospital and Institute, China, Jinan, Shandong (China)

    2016-06-15

    Purpose: To assess the preliminary feasibility of automated treatment planning verification system in cervical cancer IMRT pre-treatment dose verification. Methods: The study selected randomly clinical IMRT treatment planning data for twenty patients with cervical cancer, all IMRT plans were divided into 7 fields to meet the dosimetric goals using a commercial treatment planning system(PianncleVersion 9.2and the EclipseVersion 13.5). The plans were exported to the Mobius 3D (M3D)server percentage differences of volume of a region of interest (ROI) and dose calculation of target region and organ at risk were evaluated, in order to validate the accuracy automated treatment planning verification system. Results: The difference of volume for Pinnacle to M3D was less than results for Eclipse to M3D in ROI, the biggest difference was 0.22± 0.69%, 3.5±1.89% for Pinnacle and Eclipse respectively. M3D showed slightly better agreement in dose of target and organ at risk compared with TPS. But after recalculating plans by M3D, dose difference for Pinnacle was less than Eclipse on average, results were within 3%. Conclusion: The method of utilizing the automated treatment planning system to validate the accuracy of plans is convenientbut the scope of differences still need more clinical patient cases to determine. At present, it should be used as a secondary check tool to improve safety in the clinical treatment planning.

  3. Remaining Sites Verification Package for the 116-F-16, PNL Outfall and the 100-F-43, PNL Outfall Spillway. Attachment to Waste Site Reclassification Form 2006-039 and 2006-046

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 100-F-43 waste site is the portion of the former discharge spillway for the PNL Outfall formerly existing above the ordinary high water mark of the Columbia River. The spillway consisted of a concrete flume used to discharge waste effluents from the 100-F Experimental Animal Farm. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  4. RRB's SVES Input File - Post Entitlement State Verification and Exchange System (PSSVES)

    Data.gov (United States)

    Social Security Administration — Several PSSVES request files are transmitted to SSA each year for processing in the State Verification and Exchange System (SVES). This is a first step in obtaining...

  5. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  6. Waste Feed Delivery Transfer System Analysis

    Energy Technology Data Exchange (ETDEWEB)

    JULYK, L.J.

    2000-05-05

    This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.

  7. Waste Feed Delivery Transfer System Analysis

    International Nuclear Information System (INIS)

    JULYK, L.J.

    2000-01-01

    This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms

  8. Liquid waste treatment system. Final report

    International Nuclear Information System (INIS)

    Baker, M.N.; Houston, H.M.

    1999-01-01

    Pretreatment of high-level liquid radioactive waste (HLW) at the West Valley Demonstration Project (WVDP) involved three distinct processing operations: decontamination of liquid HLW in the Supernatant Treatment System (STS); volume reduction of decontaminated liquid in the Liquid Waste Treatment System (LWTS); and encapsulation of resulting concentrates into an approved cement waste form in the Cement Solidification System (CSS). Together, these systems and operations made up the Integrated Radwaste Treatment System (IRTS)

  9. Process equipment waste and process waste liquid collection systems

    International Nuclear Information System (INIS)

    1990-06-01

    The US DOE has prepared an environmental assessment for construction related to the Process Equipment Waste (PEW) and Process Waste Liquid (PWL) Collection System Tasks at the Idaho Chemical Processing Plant. This report describes and evaluates the environmental impacts of the proposed action (and alternatives). The purpose of the proposed action would be to ensure that the PEW and PWL collection systems, a series of enclosed process hazardous waste, and radioactive waste lines and associated equipment, would be brought into compliance with applicable State and Federal hazardous waste regulations. This would be accomplished primarily by rerouting the lines to stay within the buildings where the lined floors of the cells and corridors would provide secondary containment. Leak detection would be provided via instrumented collection sumps locate din the cells and corridors. Hazardous waste transfer lines that are routed outside buildings will be constructed using pipe-in-pipe techniques with leak detection instrumentation in the interstitial area. The need for the proposed action was identified when a DOE-sponsored Resource Conservation and Recovery Act (RCRA) compliance assessment of the ICPP facilities found that singly-contained waste lines ran buried in the soil under some of the original facilities. These lines carried wastes with a pH of less than 2.0, which were hazardous waste according to the RCRA standards. 20 refs., 7 figs., 1 tab

  10. Subsurface barrier verification technologies, informal report

    International Nuclear Information System (INIS)

    Heiser, J.H.

    1994-06-01

    One of the more promising remediation options available to the DOE waste management community is subsurface barriers. Some of the uses of subsurface barriers include surrounding and/or containing buried waste, as secondary confinement of underground storage tanks, to direct or contain subsurface contaminant plumes and to restrict remediation methods, such as vacuum extraction, to a limited area. To be most effective the barriers should be continuous and depending on use, have few or no breaches. A breach may be formed through numerous pathways including: discontinuous grout application, from joints between panels and from cracking due to grout curing or wet-dry cycling. The ability to verify barrier integrity is valuable to the DOE, EPA, and commercial sector and will be required to gain full public acceptance of subsurface barriers as either primary or secondary confinement at waste sites. It is recognized that no suitable method exists for the verification of an emplaced barrier's integrity. The large size and deep placement of subsurface barriers makes detection of leaks challenging. This becomes magnified if the permissible leakage from the site is low. Detection of small cracks (fractions of an inch) at depths of 100 feet or more has not been possible using existing surface geophysical techniques. Compounding the problem of locating flaws in a barrier is the fact that no placement technology can guarantee the completeness or integrity of the emplaced barrier. This report summarizes several commonly used or promising technologies that have been or may be applied to in-situ barrier continuity verification

  11. Real-Time System Verification by Kappa-Induction

    Science.gov (United States)

    Pike, Lee S.

    2005-01-01

    We report the first formal verification of a reintegration protocol for a safety-critical, fault-tolerant, real-time distributed embedded system. A reintegration protocol increases system survivability by allowing a node that has suffered a fault to regain state consistent with the operational nodes. The protocol is verified in the Symbolic Analysis Laboratory (SAL), where bounded model checking and decision procedures are used to verify infinite-state systems by k-induction. The protocol and its environment are modeled as synchronizing timeout automata. Because k-induction is exponential with respect to k, we optimize the formal model to reduce the size of k. Also, the reintegrator's event-triggered behavior is conservatively modeled as time-triggered behavior to further reduce the size of k and to make it invariant to the number of nodes modeled. A corollary is that a clique avoidance property is satisfied.

  12. Orion GN&C Fault Management System Verification: Scope And Methodology

    Science.gov (United States)

    Brown, Denise; Weiler, David; Flanary, Ronald

    2016-01-01

    In order to ensure long-term ability to meet mission goals and to provide for the safety of the public, ground personnel, and any crew members, nearly all spacecraft include a fault management (FM) system. For a manned vehicle such as Orion, the safety of the crew is of paramount importance. The goal of the Orion Guidance, Navigation and Control (GN&C) fault management system is to detect, isolate, and respond to faults before they can result in harm to the human crew or loss of the spacecraft. Verification of fault management/fault protection capability is challenging due to the large number of possible faults in a complex spacecraft, the inherent unpredictability of faults, the complexity of interactions among the various spacecraft components, and the inability to easily quantify human reactions to failure scenarios. The Orion GN&C Fault Detection, Isolation, and Recovery (FDIR) team has developed a methodology for bounding the scope of FM system verification while ensuring sufficient coverage of the failure space and providing high confidence that the fault management system meets all safety requirements. The methodology utilizes a swarm search algorithm to identify failure cases that can result in catastrophic loss of the crew or the vehicle and rare event sequential Monte Carlo to verify safety and FDIR performance requirements.

  13. Formal modeling and verification of systems with self-x properties

    OpenAIRE

    Reif, Wolfgang

    2006-01-01

    Formal modeling and verification of systems with self-x properties / Matthias Güdemann, Frank Ortmeier and Wolfgang Reif. - In: Autonomic and trusted computing : third international conference, ATC 2006, Wuhan, China, September 3-6, 2006 ; proceedings / Laurence T. Yang ... (eds.). - Berlin [u.a.] : Springer, 2006. - S. 38-47. - (Lecture notes in computer science ; 4158)

  14. Verification test of control rod system for HTR-10

    International Nuclear Information System (INIS)

    Zhou Huizhong; Diao Xingzhong; Huang Zhiyong; Cao Li; Yang Nianzu

    2002-01-01

    There are 10 sets of control rods and driving devices in 10 MW High Temperature Gas-cooled Test Reactor (HTR-10). The control rod system is the controlling and shutdown system of HTR-10, which is designed for reactor criticality, operation, and shutdown. In order to guarantee technical feasibility, a series of verification tests were performed, including room temperature test, thermal test, test after control rod system installed in HTR-10, and test of control rod system before HTR-10 first criticality. All the tests data showed that driving devices working well, control rods running smoothly up and down, random position settling well, and exactly position indicating

  15. Development of a Torque Sensor-Based Test Bed for Attitude Control System Verification and Validation

    Science.gov (United States)

    2017-12-30

    AFRL-RV-PS- AFRL-RV-PS- TR-2018-0008 TR-2018-0008 DEVELOPMENT OF A TORQUE SENSOR- BASED TEST BED FOR ATTITUDE CONTROL SYSTEM VERIFICATION AND...Sensor-Based Test Bed for Attitude Control System Verification & Validation 5a. CONTRACT NUMBER FA9453-15-1-0315 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...NUMBER 62601F 6. AUTHOR(S) Norman Fitz-Coy 5d. PROJECT NUMBER 4846 5e. TASK NUMBER PPM00015968 5f. WORK UNIT NUMBER EF125135 7. PERFORMING

  16. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  17. Waste monitoring system for effluents

    International Nuclear Information System (INIS)

    Macdonald, J.M.; Gomez, B.; Trujillo, L.; Malcom, J.E.; Nekimken, H.; Pope, N.; Bibeau, R.

    1995-07-01

    The waste monitoring system in use at Los Alamos National Laboratory's Plutonium Facility, TA-55, is a computer-based system that proves real-time information on industrial effluents. Remote computers monitor discharge events and data moves from one system to another via a local area network. This report describes the history, system design, summary, instrumentation list, displays, trending screens, and layout of the waste monitoring system

  18. Remaining Sites Verification Package for the 126-B-3, 184-B Coal Pit Dumping Area. Attachment to Waste Site Reclassification Form 2005-028

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition operations in the 1970s, the site was used for disposal of demolition debris from 100-B/C Area facilities. The site has been remediated by removing debris and contaminated soils. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  19. Towards the Verification of Safety-critical Autonomous Systems in Dynamic Environments

    Directory of Open Access Journals (Sweden)

    Adina Aniculaesei

    2016-12-01

    Full Text Available There is an increasing necessity to deploy autonomous systems in highly heterogeneous, dynamic environments, e.g. service robots in hospitals or autonomous cars on highways. Due to the uncertainty in these environments, the verification results obtained with respect to the system and environment models at design-time might not be transferable to the system behavior at run time. For autonomous systems operating in dynamic environments, safety of motion and collision avoidance are critical requirements. With regard to these requirements, Macek et al. [6] define the passive safety property, which requires that no collision can occur while the autonomous system is moving. To verify this property, we adopt a two phase process which combines static verification methods, used at design time, with dynamic ones, used at run time. In the design phase, we exploit UPPAAL to formalize the autonomous system and its environment as timed automata and the safety property as TCTL formula and to verify the correctness of these models with respect to this property. For the runtime phase, we build a monitor to check whether the assumptions made at design time are also correct at run time. If the current system observations of the environment do not correspond to the initial system assumptions, the monitor sends feedback to the system and the system enters a passive safe state.

  20. Method Verification Requirements for an Advanced Imaging System for Microbial Plate Count Enumeration.

    Science.gov (United States)

    Jones, David; Cundell, Tony

    2018-01-01

    The Growth Direct™ System that automates the incubation and reading of membrane filtration microbial counts on soybean-casein digest, Sabouraud dextrose, and R2A agar differs only from the traditional method in that micro-colonies on the membrane are counted using an advanced imaging system up to 50% earlier in the incubation. Based on the recommendations in USP Validation of New Microbiological Testing Methods , the system may be implemented in a microbiology laboratory after simple method verification and not a full method validation. LAY ABSTRACT: The Growth Direct™ System that automates the incubation and reading of microbial counts on membranes on solid agar differs only from the traditional method in that micro-colonies on the membrane are counted using an advanced imaging system up to 50% earlier in the incubation time. Based on the recommendations in USP Validation of New Microbiological Testing Methods , the system may be implemented in a microbiology laboratory after simple method verification and not a full method validation. © PDA, Inc. 2018.

  1. Analysis of the systems for management of radioactive wastes from nuclear medicine clinics of the city of Recife, Pernambuco, Brazil

    International Nuclear Information System (INIS)

    Lira, Renata Farias de; Lopes, Ferdinand de Jesus; Passos, Robson Silva; Silva, Valeria Cosma Bento da; Belo, Igor Burgo; Santos, Marcus Aurelio Pereira dos

    2009-01-01

    In nuclear medicine compounds marked with radionuclides, called radiopharmaceuticals, for obtention diagnostic information and for diseases treatment. The physicochemical characteristics of the radiopharmaceuticals determine his fixation at target-organ, and the physical characteristics determine the compound application in diagnostic or therapy. The handling of radiopharmaceuticals generates solid, liquid and gas wastes. The presence of these wastes implies in a adequate management according to regulation standards established by the Brazilian Nuclear Energy Commission (CNEN). The objective of safe management of radioactive wastes is to protect the human being and the preservation of the environment, limiting possible radiological impacts for the future generation, and comprehend a set of technical and administrative activities involved in the collection, segregation, handling, conditioning, transportation, storage, control and elimination, or the final deposition. This work intends to verify if the radioactive waste management systems from the nuclear medicine clinics at the city of Recife are conformal with te normative regulations issued by the CNEN. The initial obtained results are used to elaboration of conformal verification spreadsheet and its application in six nuclear medicine clinics at Recife

  2. Remaining Sites Verification Package for the 126-F-2, 183-F Clearwells, Waste Site Reclassification Form 2006-017

    Energy Technology Data Exchange (ETDEWEB)

    R. A. Carlson

    2006-05-04

    The 126-F-2 site is the clearwell facility formerly used as part of the reactor cooling water treatment at the 183-F facility. During demolition operations in the 1970s, potentially contaminated debris was disposed in the eastern clearwell structure. The site has been remediated by removing all debris in the clearwell structure to the Environmental Restoration Disposal Facility. The results of radiological surveys and visual inspection of the remediated clearwell structure show neither residual contamination nor the potential for contaminant migration beyond the clearwell boundaries. The results of verification sampling at the remediation waste staging area demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  3. Remaining Sites Verification Package for the 126-F-2, 183-F Clearwells, Waste Site Reclassification Form 2006-017

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2006-01-01

    The 126-F-2 site is the clearwell facility formerly used as part of the reactor cooling water treatment at the 183-F facility. During demolition operations in the 1970s, potentially contaminated debris was disposed in the eastern clearwell structure. The site has been remediated by removing all debris in the clearwell structure to the Environmental Restoration Disposal Facility. The results of radiological surveys and visual inspection of the remediated clearwell structure show neither residual contamination nor the potential for contaminant migration beyond the clearwell boundaries. The results of verification sampling at the remediation waste staging area demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  4. Hanford solid waste management system simulation

    International Nuclear Information System (INIS)

    Shaver, S.R.; Armacost, L.L.; Konynenbelt, H.S.; Wehrman, R.R.

    1994-12-01

    This paper describes systems analysis and simulation model development for a proposed solid waste management system at a U.S. Department of Energy Site. The proposed system will include a central storage facility, four treatment facilities, and three disposal sites. The material managed by this system will include radioactive, hazardous, and mixed radioactive and hazardous wastes. The objective of the modeling effort is to provide a means of evaluating throughput and capacity requirements for the proposed treatment, storage, and disposal facilities. The model is used to evaluate alternative system configurations and the effect on the alternatives of changing waste stream characteristics and receipt schedules. An iterative modeling and analysis approach is used that provides macro-level models early in the project and establishes credibility with the customer. The results from the analyses based on the macro models influence system design decisions and provide information that helps focus subsequent model development. Modeling and simulation of alternative system configurations and operating strategies yield a better understanding of the solid waste system requirements. The model effectively integrates information obtained through systems analysis and waste characterization to provide a consistent basis for system and facility planning

  5. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2

    Energy Technology Data Exchange (ETDEWEB)

    PARSONS, J.E.

    2000-07-15

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  6. Towards the Formal Verification of a Distributed Real-Time Automotive System

    Science.gov (United States)

    Endres, Erik; Mueller, Christian; Shadrin, Andrey; Tverdyshev, Sergey

    2010-01-01

    We present the status of a project which aims at building, formally and pervasively verifying a distributed automotive system. The target system is a gate-level model which consists of several interconnected electronic control units with independent clocks. This model is verified against the specification as seen by a system programmer. The automotive system is implemented on several FPGA boards. The pervasive verification is carried out using combination of interactive theorem proving (Isabelle/HOL) and model checking (LTL).

  7. Translating Activity Diagram from Duration Calculus for Modeling of Real-Time Systems and its Formal Verification using UPPAAL and DiVinE

    Directory of Open Access Journals (Sweden)

    Muhammad Abdul Basit Ur Rehman

    2016-01-01

    Full Text Available The RTS (Real-Time Systems are widely used in industry, home appliances, life saving systems, aircrafts, and automatic weapons. These systems need more accuracy, safety, and reliability. An accurate graphical modeling and verification of such systems is really challenging. The formal methods made it possible to model such systems with more accuracy. In this paper, we envision a strategy to overcome the inadequacy of SysML (System Modeling Language for modeling and verification of RTS, and illustrate the framework by applying it on a case study of fuel filling machine. We have defined DC (Duration Calculus implementaion based formal semantics to specify the functionality of RTS. The activity diagram in then generated from these semantics. Finally, the graphical model is verified using UPPAAL and DiVinE model checkers for validation of timed and untimed properties with accelerated verification speed. Our results suggest the use of methodology for modeling and verification of large scale real-time systems with reduced verification cost.

  8. Translating activity diagram from duration calculus for modeling of real-time systems and its formal verification using UPPAAL and DiVinE

    International Nuclear Information System (INIS)

    Rahim, M.A.B.U.; Arif, F.

    2016-01-01

    The RTS (Real-Time Systems) are widely used in industry, home appliances, life saving systems, aircrafts, and automatic weapons. These systems need more accuracy, safety, and reliability. An accurate graphical modeling and verification of such systems is really challenging. The formal methods made it possible to model such systems with more accuracy. In this paper, we envision a strategy to overcome the inadequacy of SysML (System Modeling Language) for modeling and verification of RTS, and illustrate the framework by applying it on a case study of fuel filling machine. We have defined DC (Duration Calculus) implementation based formal semantics to specify the functionality of RTS. The activity diagram in then generated from these semantics. Finally, the graphical model is verified using UPPAAL and DiVinE model checkers for validation of timed and untimed properties with accelerated verification speed. Our results suggest the use of methodology for modeling and verification of large scale real-time systems with reduced verification cost. (author)

  9. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Smith, T. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Pareizs, J. M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-06-01

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combined 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These

  10. A Model for Collaborative Runtime Verification

    NARCIS (Netherlands)

    Testerink, Bas; Bulling, Nils; Dastani, Mehdi

    2015-01-01

    Runtime verification concerns checking whether a system execution satisfies a given property. In this paper we propose a model for collaborative runtime verification where a network of local monitors collaborates in order to verify properties of the system. A local monitor has only a local view on

  11. Solid Waste Information Tracking System (SWITS), Backlog Waste Modifications, Software Requirements Specification (SRS)

    International Nuclear Information System (INIS)

    Clark, R.E.

    1995-01-01

    Purpose of this document is to define the system requirements necessary to improve computer support for the WHC backlog waste business process through enhancements to the backlog waste function of the SWITS system. This SRS document covers enhancements to the SWITS system to support changes to the existing Backlog Waste screens including new data elements, label changes, and new pop-up screens. The pop-ups will allow the user to flag the processes that a waste container must have performed on it, and will provide history tracking of changes to data. A new screen will also be provided allowing Acceptable Services to perform mass updates to specific data in Backlog Waste table. The SWITS Backlog Waste enhancements in this document will support the project goals in WHC-SD-WM-003 and its Revision 1 (Radioactive Solid Waste Tracking System Conceptual Definition) for the control, tracing, and inventory management of waste as the packages are generated and moved through final disposal (cradle-to-grave)

  12. Assessing waste management systems using reginalt software

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs

  13. HDL to verification logic translator

    Science.gov (United States)

    Gambles, J. W.; Windley, P. J.

    1992-01-01

    The increasingly higher number of transistors possible in VLSI circuits compounds the difficulty in insuring correct designs. As the number of possible test cases required to exhaustively simulate a circuit design explodes, a better method is required to confirm the absence of design faults. Formal verification methods provide a way to prove, using logic, that a circuit structure correctly implements its specification. Before verification is accepted by VLSI design engineers, the stand alone verification tools that are in use in the research community must be integrated with the CAD tools used by the designers. One problem facing the acceptance of formal verification into circuit design methodology is that the structural circuit descriptions used by the designers are not appropriate for verification work and those required for verification lack some of the features needed for design. We offer a solution to this dilemma: an automatic translation from the designers' HDL models into definitions for the higher-ordered logic (HOL) verification system. The translated definitions become the low level basis of circuit verification which in turn increases the designer's confidence in the correctness of higher level behavioral models.

  14. An evaluation of the management system verification pilot at Hanford

    International Nuclear Information System (INIS)

    Briggs, C.R.; Ramonas, L.; Westendorf, W.

    1998-01-01

    The Chemical Management System (CMS), currently under development at Hanford, was used as the ''test program'' for pilot testing the value added aspects of the Chemical Manufacturers Association's (CMA) Management Systems Verification (MSV) process. The MSV process, which was developed by CMA's member chemical companies specifically as a tool to assist in the continuous improvement of environment, safety and health (ESH) performance, represents a commercial sector ''best practice'' for evaluating ESH management systems. The primary purpose of Hanford's MSV Pilot was to evaluate the applicability and utility of the MSV process in the Department of Energy (DOE) environment. However, because the Integrated Safety Management System (ISMS) is the framework for ESH management at Hanford and at all DOE sites, the pilot specifically considered the MSV process in the context of a possible future adjunct to Integrated Safety Management System Verification (ISMSV) efforts at Hanford and elsewhere within the DOE complex. The pilot involved the conduct of two-hour interviews with four separate panels of individuals with functional responsibilities related to the CMS including the Department of Energy Richland Operations (DOE-RL), Fluor Daniel Hanford (FDH) and FDH's major subcontractors (MSCS). A semi-structured interview process was employed by the team of three ''verifiers'' who directed open-ended questions to the panels regarding the development, integration and effectiveness of management systems necessary to ensure the sustainability of the CMS effort. An ''MSV Pilot Effectiveness Survey'' also was completed by each panel participant immediately following the interview

  15. International exchange on nuclear safety related expert systems: The role of software verification and validation

    International Nuclear Information System (INIS)

    Sun, B.K.H.

    1996-01-01

    An important lesson learned from the Three Mile Island accident is that human errors can be significant contributors to risk. Recent advancement in computer hardware and software technology helped make expert system techniques potentially viable tools for improving nuclear power plant safety and reliability. As part of the general man-machine interface technology, expert systems have recently become increasingly prominent as a potential solution to a number of previously intractable problems in many phases of human activity, including operation, maintenance, and engineering functions. Traditional methods for testing and analyzing analog systems are no longer adequate to handle the increased complexity of software systems. The role of Verification and Validation (V and V) is to add rigor to the software development and maintenance cycle to guarantee the high level confidence needed for applications. Verification includes the process and techniques for confirming that all the software requirements in one stage of the development are met before proceeding on to the next stage. Validation involves testing the integrated software and hardware system to ensure that it reliably fulfills its intended functions. Only through a comprehensive V and V program can a high level of confidence be achieved. There exist many different standards and techniques for software verification and validation, yet they lack uniform approaches that provides adequate levels of practical guidance which can be used by users for nuclear power plant applications. There is a need to unify different approaches for addressing software verification and validation and to develop practical and cost effective guidelines for user and regulatory acceptance. (author). 8 refs

  16. Standard Verification System Lite (SVS Lite)

    Data.gov (United States)

    Social Security Administration — SVS Lite is a mainframe program used exclusively by the Office of Child Support Enforcement (OCSE) to perform batch SSN verifications. This process is exactly the...

  17. Verification and uncertainty evaluation of CASMO-3/MASTER nuclear analysis system

    Energy Technology Data Exchange (ETDEWEB)

    Song, Jae Seung; Cho, Byung Oh; Joo, Han Kyu; Zee, Sung Quun; Lee, Chung Chan; Park, Sang Yoon

    2000-06-01

    MASTER is a nuclear design code developed by KAERI. It uses group constants generated by CASMO-3 developed by Studsvik. In this report the verification and evaluation of uncertainty were performed for the code system application in nuclear reactor core analysis and design. The verification is performed via various benchmark comparisons for static and transient core condition, and core follow calculations with startup physics test predictions of total 14 cycles of pressurized water reactors. Benchmark calculation include comparisons with reference solutions of IAEA and OECA/NEA problems and critical experiment measurements. The uncertainty evaluation is focused to safety related parameters such as power distribution, reactivity coefficients, control rod worth and core reactivity. It is concluded that CASMO-3/MASTER can be applied for PWR core nuclear analysis and design without any bias factors. Also, it is verified that the system can be applied for SMART core, via supplemental comparisons with reference calculations by MCNP which is a probabilistic nuclear calculation code.

  18. Verification and uncertainty evaluation of CASMO-3/MASTER nuclear analysis system

    International Nuclear Information System (INIS)

    Song, Jae Seung; Cho, Byung Oh; Joo, Han Kyu; Zee, Sung Quun; Lee, Chung Chan; Park, Sang Yoon

    2000-06-01

    MASTER is a nuclear design code developed by KAERI. It uses group constants generated by CASMO-3 developed by Studsvik. In this report the verification and evaluation of uncertainty were performed for the code system application in nuclear reactor core analysis and design. The verification is performed via various benchmark comparisons for static and transient core condition, and core follow calculations with startup physics test predictions of total 14 cycles of pressurized water reactors. Benchmark calculation include comparisons with reference solutions of IAEA and OECA/NEA problems and critical experiment measurements. The uncertainty evaluation is focused to safety related parameters such as power distribution, reactivity coefficients, control rod worth and core reactivity. It is concluded that CASMO-3/MASTER can be applied for PWR core nuclear analysis and design without any bias factors. Also, it is verified that the system can be applied for SMART core, via supplemental comparisons with reference calculations by MCNP which is a probabilistic nuclear calculation code

  19. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2001-05-15

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3

  20. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2000-11-03

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those

  1. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2001-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be

  2. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted

  3. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT HYDRO COMPLIANCE MANAGEMENT, INC. HYDRO-KLEEN FILTRATION SYSTEM, 03/07/WQPC-SWP, SEPTEMBER 2003

    Science.gov (United States)

    Verification testing of the Hydro-Kleen(TM) Filtration System, a catch-basin filter designed to reduce hydrocarbon, sediment, and metals contamination from surface water flows, was conducted at NSF International in Ann Arbor, Michigan. A Hydro-Kleen(TM) system was fitted into a ...

  4. Quantitative analysis of patient-specific dosimetric IMRT verification

    International Nuclear Information System (INIS)

    Budgell, G J; Perrin, B A; Mott, J H L; Fairfoul, J; Mackay, R I

    2005-01-01

    Patient-specific dosimetric verification methods for IMRT treatments are variable, time-consuming and frequently qualitative, preventing evidence-based reduction in the amount of verification performed. This paper addresses some of these issues by applying a quantitative analysis parameter to the dosimetric verification procedure. Film measurements in different planes were acquired for a series of ten IMRT prostate patients, analysed using the quantitative parameter, and compared to determine the most suitable verification plane. Film and ion chamber verification results for 61 patients were analysed to determine long-term accuracy, reproducibility and stability of the planning and delivery system. The reproducibility of the measurement and analysis system was also studied. The results show that verification results are strongly dependent on the plane chosen, with the coronal plane particularly insensitive to delivery error. Unexpectedly, no correlation could be found between the levels of error in different verification planes. Longer term verification results showed consistent patterns which suggest that the amount of patient-specific verification can be safely reduced, provided proper caution is exercised: an evidence-based model for such reduction is proposed. It is concluded that dose/distance to agreement (e.g., 3%/3 mm) should be used as a criterion of acceptability. Quantitative parameters calculated for a given criterion of acceptability should be adopted in conjunction with displays that show where discrepancies occur. Planning and delivery systems which cannot meet the required standards of accuracy, reproducibility and stability to reduce verification will not be accepted by the radiotherapy community

  5. Decentralized Energy from Waste Systems

    Directory of Open Access Journals (Sweden)

    Blanca Antizar-Ladislao

    2010-01-01

    Full Text Available In the last five years or so, biofuels have been given notable consideration worldwide as an alternative to fossil fuels, due to their potential to reduce greenhouse gas emissions by partial replacement of oil as a transport fuel. The production of biofuels using a sustainable approach, should consider local production of biofuels, obtained from local feedstocks and adapted to the socio-economical and environmental characteristics of the particular region where they are developed. Thus, decentralized energy from waste systems will exploit local biomass to optimize their production and consumption. Waste streams such as agricultural and wood residues, municipal solid waste, vegetable oils, and algae residues can all be integrated in energy from waste systems. An integral optimization of decentralized energy from waste systems should not be based on the optimization of each single process, but the overall optimization of the whole process. This is by obtaining optimal energy and environmental benefits, as well as collateral beneficial co-products such as soil fertilizers which will result in a higher food crop production and carbon dioxide fixation which will abate climate change.

  6. Decentralized energy from waste systems

    International Nuclear Information System (INIS)

    Antizar-Ladislao, B.; Turrion-Gomez, J. L.

    2010-01-01

    In the last five years or so, biofuels have been given notable consideration worldwide as an alternative to fossil fuels, due to their potential to reduce greenhouse gas emissions by partial replacement of oil as a transport fuel. The production of biofuels using a sustainable approach, should consider local production of biofuels, obtained from local feedstocks and adapted to the socio-economical and environmental characteristics of the particular region where they are developed. Thus, decentralized energy from waste systems will exploit local biomass to optimize their production and consumption. Waste streams such as agricultural and wood residues, municipal solid waste, vegetable oils, and algae residues can all be integrated in energy from waste systems. An integral optimization of decentralized energy from waste systems should not be based on the optimization of each single process, but the overall optimization of the whole process. This is by obtaining optimal energy and environmental benefits, as well as collateral beneficial co-products such as soil fertilizers which will result in a higher food crop production and carbon dioxide fixation which will abate climate change. (author)

  7. Damage Detection and Verification System (DDVS) for In-Situ Health Monitoring

    Science.gov (United States)

    Williams, Martha K.; Lewis, Mark; Szafran, J.; Shelton, C.; Ludwig, L.; Gibson, T.; Lane, J.; Trautwein, T.

    2015-01-01

    Project presentation for Game Changing Program Smart Book Release. Detection and Verification System (DDVS) expands the Flat Surface Damage Detection System (FSDDS) sensory panels damage detection capabilities and includes an autonomous inspection capability utilizing cameras and dynamic computer vision algorithms to verify system health. Objectives of this formulation task are to establish the concept of operations, formulate the system requirements for a potential ISS flight experiment, and develop a preliminary design of an autonomous inspection capability system that will be demonstrated as a proof-of-concept ground based damage detection and inspection system.

  8. FY 1999 achievement report on the supporting project to form energy/environmental technology verification project - International joint verification research project. Research on the waste-fueled power system using gases emitted from the sanitary landfill in Samarkand city; 1999 nendo Samarkand shi ni okeru umetate gas wo riyoshita gomi hatsuden system no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Samarkand city, Uzbekistan, solid waste materials are treated in the sanitary landfill. However, requests were made from the Minister of Communal Services for the construction of power system as a part of the effective waste utilization and the study of the integrated waste collection system enabling the construction of a power system. There is only one waste dumping site in Samarkand city. That started to be used in the beginning of the 1970s. That was planned to be closed in 2000, but is now planned to used till 2005. Therefore, it is urgent to reduce the volume of waste. The incineration of waste is the most suitable for it. In the study of a power system by using waste effectively, it is important to efficiently recover the methane gas emitted from the waste dumping site, to study the adoption of the repowering system using the combustion gas of methane gas for increasing the generated output of waste-fueled power generation facilities, and to heighten the low power generation efficiency. This study includes the survey of the waste discharge amount/composition/heating value, collection of the data on waste collection, and sampling/analysis of gases emitted from the dumping site. The paper reported on the proposals. (NEDO)

  9. Intelligent Information System for Waste Management; Jaetehuollon aelykaes tietojaerjestelmae - iWaste

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, T. [Kuopio Univ. (Finland); Isoaho, S. [Tampere Univ. (Finland)

    2004-07-01

    ''Waste'' - Intelligent Information System for Waste Management - is a joint project of the University of Kuopio and the Tampere University of Technology. The main objective of the project is to create a basis for more comprehensive utilisation and management of waste management data and for the development of database management systems. The results of the project are numerous. A study of the present state of data management in the field of waste management was carried out. The studied aspects were for example information needs of different actors and their requirements for the information quality, interfaces for information exchange between different actors, and the characteristics of the software products. During the second phase of the project, a hyper document describing waste management systems, and a software application for describing material flows and their management will be finalized. Also methodologies and practices for processing data into information, which is needed in the decision making process, will be developed. The developed methodologies include e.g. data mining techniques, and the practices include e.g. the prediction of waste generation and optimisation of waste collection and transport. (orig.)

  10. Technical safety requirements control level verification; TOPICAL

    International Nuclear Information System (INIS)

    STEWART, J.L.

    1999-01-01

    A Technical Safety Requirement (TSR) control level verification process was developed for the Tank Waste Remediation System (TWRS) TSRs at the Hanford Site in Richland, WA, at the direction of the US. Department of Energy, Richland Operations Office (RL). The objective of the effort was to develop a process to ensure that the TWRS TSR controls are designated and managed at the appropriate levels as Safety Limits (SLs), Limiting Control Settings (LCSs), Limiting Conditions for Operation (LCOs), Administrative Controls (ACs), or Design Features. The TSR control level verification process was developed and implemented by a team of contractor personnel with the participation of Fluor Daniel Hanford, Inc. (FDH), the Project Hanford Management Contract (PHMC) integrating contractor, and RL representatives. The team was composed of individuals with the following experience base: nuclear safety analysis; licensing; nuclear industry and DOE-complex TSR preparation/review experience; tank farm operations; FDH policy and compliance; and RL-TWRS oversight. Each TSR control level designation was completed utilizing TSR control logic diagrams and TSR criteria checklists based on DOE Orders, Standards, Contractor TSR policy, and other guidance. The control logic diagrams and criteria checklists were reviewed and modified by team members during team meetings. The TSR control level verification process was used to systematically evaluate 12 LCOs, 22 AC programs, and approximately 100 program key elements identified in the TWRS TSR document. The verification of each TSR control required a team consensus. Based on the results of the process, refinements were identified and the TWRS TSRs were modified as appropriate. A final report documenting key assumptions and the control level designation for each TSR control was prepared and is maintained on file for future reference. The results of the process were used as a reference in the RL review of the final TWRS TSRs and control suite. RL

  11. Advanced control and instrumentation systems in nuclear power plants. Design, verification and validation

    International Nuclear Information System (INIS)

    Haapanen, P.

    1995-01-01

    The Technical Committee Meeting on design, verification and validation of advanced control and instrumentation systems in nuclear power plants was held in Espoo, Finland on 20 - 23 June 1994. The meeting was organized by the International Atomic Energy Agency's (IAEA) International Working Group's (IWG) on Nuclear Power Plant Control and Instrumentation (NPPCI) and on Advanced Technologies for Water Cooled Reactors (ATWR). VTT Automation together with Imatran Voima Oy and Teollisuuden Voima Oy responded about the practical arrangements of the meeting. In total 96 participants from 21 countries and the Agency took part in the meeting and 34 full papers and 8 posters were presented. Following topics were covered in the papers: (1) experience with advanced and digital systems, (2) safety and reliability analysis, (3) advanced digital systems under development and implementation, (4) verification and validation methods and practices, (5) future development trends. (orig.)

  12. VerifEYE: a real-time meat inspection system for the beef processing industry

    Science.gov (United States)

    Kocak, Donna M.; Caimi, Frank M.; Flick, Rick L.; Elharti, Abdelmoula

    2003-02-01

    Described is a real-time meat inspection system developed for the beef processing industry by eMerge Interactive. Designed to detect and localize trace amounts of contamination on cattle carcasses in the packing process, the system affords the beef industry an accurate, high speed, passive optical method of inspection. Using a method patented by United States Department of Agriculture and Iowa State University, the system takes advantage of fluorescing chlorophyll found in the animal's diet and therefore the digestive track to allow detection and imaging of contaminated areas that may harbor potentially dangerous microbial pathogens. Featuring real-time image processing and documentation of performance, the system can be easily integrated into a processing facility's Hazard Analysis and Critical Control Point quality assurance program. This paper describes the VerifEYE carcass inspection and removal verification system. Results indicating the feasibility of the method, as well as field data collected using a prototype system during four university trials conducted in 2001 are presented. Two successful demonstrations using the prototype system were held at a major U.S. meat processing facility in early 2002.

  13. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    CERN Document Server

    Parsons, J E

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  14. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    International Nuclear Information System (INIS)

    PARSONS, J.E.

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented

  15. A simple method for the verification of clearance levels for non-radioactive solid waste

    International Nuclear Information System (INIS)

    Holland, B.

    1997-01-01

    ANSTO's radiopharmaceutical production laboratories generate 25 m 3 of solid waste per month. Most of this waste is not radioactive. Up until recently the non-radioactive waste was cleared from the controlled area and stored for 10 halflives prior to disposal as normal solid refuse. To eliminate the storage and ''double handling'' of the large quantities of non-radioactive waste a simple clearance method was devised to allow direct disposal. This paper describes how clearance levels were determined. Here the term ''clearance level'' is used as a general term for the release of material regardless of whether it was previously subject to regulatory control. This contrasts with the IAEA definition of a clearance level and highlights a potential problem with the implementation of exemption levels to keep material out of regulatory control and the use of clearance levels to allow removal of materials from regulatory control. Several common hand held contamination monitors were tested to determine their limits of detection and ability to meet these clearance levels. The clearance method includes waste segregation and size limitation features to ensure the waste is monitored in a consistent manner, compatible with the limits of detection. The clearance levels achieved were subsequently found to be compatible with some of the unconditional clearance levels in IAEA-TECDOC-855 and the measurement method also meets the required features of that document. The ANSTO non-radioactive waste clearance system has been in operation for more than 12 months and has proved simple and effective to operate. Approximately 12m 3 of the solid waste is now been treated directly as normal solid refuse. This paper describes the ANSTO clearance system, the contamination monitor tests and details practical problems associated with the direct monitoring of solid waste, including averaging of the activity in the package. The paper also briefly highlights the potential problem with the use of

  16. Verification of Opacity and Diagnosability for Pushdown Systems

    Directory of Open Access Journals (Sweden)

    Koichi Kobayashi

    2013-01-01

    Full Text Available In control theory of discrete event systems (DESs, one of the challenging topics is the extension of theory of finite-state DESs to that of infinite-state DESs. In this paper, we discuss verification of opacity and diagnosability for infinite-state DESs modeled by pushdown automata (called here pushdown systems. First, we discuss opacity of pushdown systems and prove that opacity of pushdown systems is in general undecidable. In addition, a decidable class is clarified. Next, in diagnosability, we prove that under a certain assumption, which is different from the assumption in the existing result, diagnosability of pushdown systems is decidable. Furthermore, a necessary condition and a sufficient condition using finite-state approximations are derived. Finally, as one of the applications, we consider data integration using XML (Extensible Markup Language. The obtained result is useful for developing control theory of infinite-state DESs.

  17. Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit[CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C

  18. Geochemical assessment of nuclear waste isolation. Report of activities during fiscal year 1982

    Energy Technology Data Exchange (ETDEWEB)

    1983-07-01

    The status of the following investigations is reported: canister/overpack-backfill chemical interactions and mechanisms; backfill and near-field host rock chemical interactions mechanisms; far-field host rock geochemical interactions; verification and improvement of predictive algorithms for radionuclide migration; and geologic systems as analogues for long-term radioactive waste isolation.

  19. Geochemical assessment of nuclear waste isolation. Report of activities during fiscal year 1982

    International Nuclear Information System (INIS)

    1983-07-01

    The status of the following investigations is reported: canister/overpack-backfill chemical interactions and mechanisms; backfill and near-field host rock chemical interactions mechanisms; far-field host rock geochemical interactions; verification and improvement of predictive algorithms for radionuclide migration; and geologic systems as analogues for long-term radioactive waste isolation

  20. Lessons Learned From Microkernel Verification — Specification is the New Bottleneck

    Directory of Open Access Journals (Sweden)

    Thorsten Bormer

    2012-11-01

    Full Text Available Software verification tools have become a lot more powerful in recent years. Even verification of large, complex systems is feasible, as demonstrated in the L4.verified and Verisoft XT projects. Still, functional verification of large software systems is rare – for reasons beyond the large scale of verification effort needed due to the size alone. In this paper we report on lessons learned for verification of large software systems based on the experience gained in microkernel verification in the Verisoft XT project. We discuss a number of issues that impede widespread introduction of formal verification in the software life-cycle process.

  1. 76 FR 4823 - Hazardous Waste Management System; Identifying and Listing Hazardous Waste Exclusion

    Science.gov (United States)

    2011-01-27

    ... Waste Management System; Identifying and Listing Hazardous Waste Exclusion AGENCY: Environmental... hazardous wastes. The Agency has decided to grant the petition based on an evaluation of waste-specific... excludes the petitioned waste from the requirements of hazardous waste regulations under the Resource...

  2. Physical system requirements - Accept waste

    International Nuclear Information System (INIS)

    1992-08-01

    The Nuclear Waste Policy Act (NWPA) assigned to the Department of Energy (DOE) the responsibility for managing the disposal of spent nuclear fuel and high-level radioactive waste and established the Office of Civilian Radioactive Waste Management (OCRWM) for that purpose. The Secretary of Energy, in his November 1989 report to Congress (DOE/RW-0247), announced new initiatives for the conduct of the Civilian Radioactive Waste Management (CRWM) program. One of these initiatives was to establish improved management structure and procedures. In response, OCRWM performed a management study and the OCRWM Director subsequently issued the Management Systems improvement Strategy (MSIS) on August 10, 1990, calling for a rigorous implementation of systems engineering principles with a special emphasis on functional analysis. The functional analysis approach establishes a framework for integrating the program management efforts with the technical requirements analysis into a single, unified, and consistent program. This approach recognizes that just as the facilities and equipment comprising the physical waste management system must perform certain functions, so must certain programmatic and management functions be performed within the program in order to successfully bring the physical system into being. Thus, a comprehensive functional analysis effort has been undertaken which is intended to: Identify the functions that must be performed to fulfill the waste disposal mission; Identify the corresponding requirements imposed on each of the functions; and Identify the conceptual architecture that will be used to satisfy the requirements. The principal purpose of this requirements document is to present the results that were obtained from the conduct of a functional analysis effort for the Accept Waste mission

  3. Expert system verification and validation survey. Delivery 3: Recommendations

    Science.gov (United States)

    1990-01-01

    The purpose is to determine the state-of-the-practice in Verification and Validation (V and V) of Expert Systems (ESs) on current NASA and Industry applications. This is the first task of a series which has the ultimate purpose of ensuring that adequate ES V and V tools and techniques are available for Space Station Knowledge Based Systems development. The strategy for determining the state-of-the-practice is to check how well each of the known ES V and V issues are being addressed and to what extent they have impacted the development of ESs.

  4. Biogas-centred domestic waste recycling system

    Energy Technology Data Exchange (ETDEWEB)

    Gupta, C L

    1983-04-01

    In fast developing suburban towns, there is an urgent need for an integrated system for waste recycling and energy and fertiliser supply on a single house basis. This is because even though toilet waste is handled by a septic tank-soak pit arrangement, kitchen and bathroom water and solid organic wastes have to be discharged outside the house. A biogas based domestic waste recycling system has been designed and constructed and has been successfully working. Some salient features of this plant are discussed here.

  5. Model-Based Design and Formal Verification Processes for Automated Waterway System Operations

    Directory of Open Access Journals (Sweden)

    Leonard Petnga

    2016-06-01

    Full Text Available Waterway and canal systems are particularly cost effective in the transport of bulk and containerized goods to support global trade. Yet, despite these benefits, they are among the most under-appreciated forms of transportation engineering systems. Looking ahead, the long-term view is not rosy. Failures, delays, incidents and accidents in aging waterway systems are doing little to attract the technical and economic assistance required for modernization and sustainability. In a step toward overcoming these challenges, this paper argues that programs for waterway and canal modernization and sustainability can benefit significantly from system thinking, supported by systems engineering techniques. We propose a multi-level multi-stage methodology for the model-based design, simulation and formal verification of automated waterway system operations. At the front-end of development, semi-formal modeling techniques are employed for the representation of project goals and scenarios, requirements and high-level models of behavior and structure. To assure the accuracy of engineering predictions and the correctness of operations, formal modeling techniques are used for the performance assessment and the formal verification of the correctness of functionality. The essential features of this methodology are highlighted in a case study examination of ship and lock-system behaviors in a two-stage lock system.

  6. Evaluation factors for verification and validation of low-level waste disposal site models

    International Nuclear Information System (INIS)

    Moran, M.S.; Mezga, L.J.

    1982-01-01

    The purpose of this paper is to identify general evaluation factors to be used to verify and validate LLW disposal site performance models in order to assess their site-specific applicability and to determine their accuracy and sensitivity. It is intended that the information contained in this paper be employed by model users involved with LLW site performance model verification and validation. It should not be construed as providing protocols, but rather as providing a framework for the preparation of specific protocols or procedures. A brief description of each evaluation factor is provided. The factors have been categorized according to recommended use during either the model verification or the model validation process. The general responsibilities of the developer and user are provided. In many cases it is difficult to separate the responsibilities of the developer and user, but the user is ultimately accountable for both verification and validation processes. 4 refs

  7. Radiochemical verification and validation in the environmental data collection process

    International Nuclear Information System (INIS)

    Rosano-Reece, D.; Bottrell, D.; Bath, R.J.

    1994-01-01

    A credible and cost effective environmental data collection process should produce analytical data which meets regulatory and program specific requirements. Analytical data, which support the sampling and analysis activities at hazardous waste sites, undergo verification and independent validation before the data are submitted to regulators. Understanding the difference between verification and validation and their respective roles in the sampling and analysis process is critical to the effectiveness of a program. Verification is deciding whether the measurement data obtained are what was requested. The verification process determines whether all the requirements were met. Validation is more complicated than verification. It attempts to assess the impacts on data use, especially when requirements are not met. Validation becomes part of the decision-making process. Radiochemical data consists of a sample result with an associated error. Therefore, radiochemical validation is different and more quantitative than is currently possible for the validation of hazardous chemical data. Radiochemical data include both results and uncertainty that can be statistically compared to identify significance of differences in a more technically defensible manner. Radiochemical validation makes decisions about analyte identification, detection, and uncertainty for a batch of data. The process focuses on the variability of the data in the context of the decision to be made. The objectives of this paper are to present radiochemical verification and validation for environmental data and to distinguish the differences between the two operations

  8. Expert system for transuranic waste assay

    Energy Technology Data Exchange (ETDEWEB)

    Zoolalian, M.L.; Gibbs, A.; Kuhns, J.D.

    1989-01-01

    Transuranic wastes are generated at the Savannah River Site (SRS) as a result of routine production of nuclear materials. These wastes contain Pu-238 and Pu-239 and are placed into lined 55-gallon waste drums. The drums are placed on monitored storage pads pending shipment to the Waste Isolation Pilot Plant in New Mexico. A passive-active neutron (PAN) assay system is used to determine the mass of the radioactive material within the waste drums. Assay results are used to classify the wastes as either low-level or transuranic (TRU). During assays, the PAN assay system communicates with an IBM-AT computer. A Fortran computer program, called NEUT, controls and performs all data analyses. Unassisted, the NEUT program cannot adequately interpret assay results. To eliminate this limitation, an expert system shell was used to write a new algorithm, called the Transuranic Expert System (TRUX), to drive the NEUT program and add decision making capabilities for analysis of the assay results. The TRUX knowledge base was formulated by consulting with human experts in the field of neutron assay, by direct experimentation on the PAN assay system, and by observing operations on a daily basis. TRUX, with its improved ability to interpret assay results, has eliminated the need for close supervision by a human expert, allowing skilled technicians to operate the PAN assay system. 4 refs., 1 fig., 4 tabs.

  9. Expert system for transuranic waste assay

    International Nuclear Information System (INIS)

    Zoolalian, M.L.; Gibbs, A.; Kuhns, J.D.

    1989-01-01

    Transuranic wastes are generated at the Savannah River Site (SRS) as a result of routine production of nuclear materials. These wastes contain Pu-238 and Pu-239 and are placed into lined 55-gallon waste drums. The drums are placed on monitored storage pads pending shipment to the Waste Isolation Pilot Plant in New Mexico. A passive-active neutron (PAN) assay system is used to determine the mass of the radioactive material within the waste drums. Assay results are used to classify the wastes as either low-level or transuranic (TRU). During assays, the PAN assay system communicates with an IBM-AT computer. A Fortran computer program, called NEUT, controls and performs all data analyses. Unassisted, the NEUT program cannot adequately interpret assay results. To eliminate this limitation, an expert system shell was used to write a new algorithm, called the Transuranic Expert System (TRUX), to drive the NEUT program and add decision making capabilities for analysis of the assay results. The TRUX knowledge base was formulated by consulting with human experts in the field of neutron assay, by direct experimentation on the PAN assay system, and by observing operations on a daily basis. TRUX, with its improved ability to interpret assay results, has eliminated the need for close supervision by a human expert, allowing skilled technicians to operate the PAN assay system. 4 refs., 1 fig., 4 tabs

  10. Waste Information Management System-2012 - 12114

    Energy Technology Data Exchange (ETDEWEB)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.; Roelant, D. [Applied Research Center, Florida International University, 10555 West Flagler Street, Suite 2100, Miami, FL 33174 (United States)

    2012-07-01

    The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has

  11. Remaining Sites Verification Package for the 100-F-33, 146-F Aquatic Biology Fish Ponds. Attachment to Waste Site Reclassification Form 2006-021

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 100-F-33, 146-F Aquatice Biology Fish Ponds waste site was an area with six small rectangular ponds and one large circular pond used to conduct tests on fish using various mixtures of river and reactor effluent water. The current site conditions achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification and applicable confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  12. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase

  13. Secure optical verification using dual phase-only correlation

    International Nuclear Information System (INIS)

    Liu, Wei; Liu, Shutian; Zhang, Yan; Xie, Zhenwei; Liu, Zhengjun

    2015-01-01

    We introduce a security-enhanced optical verification system using dual phase-only correlation based on a novel correlation algorithm. By employing a nonlinear encoding, the inherent locks of the verification system are obtained in real-valued random distributions, and the identity keys assigned to authorized users are designed as pure phases. The verification process is implemented in two-step correlation, so only authorized identity keys can output the discriminate auto-correlation and cross-correlation signals that satisfy the reset threshold values. Compared with the traditional phase-only-correlation-based verification systems, a higher security level against counterfeiting and collisions are obtained, which is demonstrated by cryptanalysis using known attacks, such as the known-plaintext attack and the chosen-plaintext attack. Optical experiments as well as necessary numerical simulations are carried out to support the proposed verification method. (paper)

  14. A system for EPID-based real-time treatment delivery verification during dynamic IMRT treatment.

    Science.gov (United States)

    Fuangrod, Todsaporn; Woodruff, Henry C; van Uytven, Eric; McCurdy, Boyd M C; Kuncic, Zdenka; O'Connor, Daryl J; Greer, Peter B

    2013-09-01

    To design and develop a real-time electronic portal imaging device (EPID)-based delivery verification system for dynamic intensity modulated radiation therapy (IMRT) which enables detection of gross treatment delivery errors before delivery of substantial radiation to the patient. The system utilizes a comprehensive physics-based model to generate a series of predicted transit EPID image frames as a reference dataset and compares these to measured EPID frames acquired during treatment. The two datasets are using MLC aperture comparison and cumulative signal checking techniques. The system operation in real-time was simulated offline using previously acquired images for 19 IMRT patient deliveries with both frame-by-frame comparison and cumulative frame comparison. Simulated error case studies were used to demonstrate the system sensitivity and performance. The accuracy of the synchronization method was shown to agree within two control points which corresponds to approximately ∼1% of the total MU to be delivered for dynamic IMRT. The system achieved mean real-time gamma results for frame-by-frame analysis of 86.6% and 89.0% for 3%, 3 mm and 4%, 4 mm criteria, respectively, and 97.9% and 98.6% for cumulative gamma analysis. The system can detect a 10% MU error using 3%, 3 mm criteria within approximately 10 s. The EPID-based real-time delivery verification system successfully detected simulated gross errors introduced into patient plan deliveries in near real-time (within 0.1 s). A real-time radiation delivery verification system for dynamic IMRT has been demonstrated that is designed to prevent major mistreatments in modern radiation therapy.

  15. MO-FG-202-01: A Fast Yet Sensitive EPID-Based Real-Time Treatment Verification System

    International Nuclear Information System (INIS)

    Ahmad, M; Nourzadeh, H; Neal, B; Siebers, J; Watkins, W

    2016-01-01

    Purpose: To create a real-time EPID-based treatment verification system which robustly detects treatment delivery and patient attenuation variations. Methods: Treatment plan DICOM files sent to the record-and-verify system are captured and utilized to predict EPID images for each planned control point using a modified GPU-based digitally reconstructed radiograph algorithm which accounts for the patient attenuation, source energy fluence, source size effects, and MLC attenuation. The DICOM and predicted images are utilized by our C++ treatment verification software which compares EPID acquired 1024×768 resolution frames acquired at ∼8.5hz from Varian Truebeam™ system. To maximize detection sensitivity, image comparisons determine (1) if radiation exists outside of the desired treatment field; (2) if radiation is lacking inside the treatment field; (3) if translations, rotations, and magnifications of the image are within tolerance. Acquisition was tested with known test fields and prior patient fields. Error detection was tested in real-time and utilizing images acquired during treatment with another system. Results: The computational time of the prediction algorithms, for a patient plan with 350 control points and 60×60×42cm^3 CT volume, is 2–3minutes on CPU and <27 seconds on GPU for 1024×768 images. The verification software requires a maximum of ∼9ms and ∼19ms for 512×384 and 1024×768 resolution images, respectively, to perform image analysis and dosimetric validations. Typical variations in geometric parameters between reference and the measured images are 0.32°for gantry rotation, 1.006 for scaling factor, and 0.67mm for translation. For excess out-of-field/missing in-field fluence, with masks extending 1mm (at isocenter) from the detected aperture edge, the average total in-field area missing EPID fluence was 1.5mm2 the out-of-field excess EPID fluence was 8mm^2, both below error tolerances. Conclusion: A real-time verification software, with

  16. MO-FG-202-01: A Fast Yet Sensitive EPID-Based Real-Time Treatment Verification System

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, M; Nourzadeh, H; Neal, B; Siebers, J [University of Virginia Health System, Charlottesville, VA (United States); Watkins, W

    2016-06-15

    Purpose: To create a real-time EPID-based treatment verification system which robustly detects treatment delivery and patient attenuation variations. Methods: Treatment plan DICOM files sent to the record-and-verify system are captured and utilized to predict EPID images for each planned control point using a modified GPU-based digitally reconstructed radiograph algorithm which accounts for the patient attenuation, source energy fluence, source size effects, and MLC attenuation. The DICOM and predicted images are utilized by our C++ treatment verification software which compares EPID acquired 1024×768 resolution frames acquired at ∼8.5hz from Varian Truebeam™ system. To maximize detection sensitivity, image comparisons determine (1) if radiation exists outside of the desired treatment field; (2) if radiation is lacking inside the treatment field; (3) if translations, rotations, and magnifications of the image are within tolerance. Acquisition was tested with known test fields and prior patient fields. Error detection was tested in real-time and utilizing images acquired during treatment with another system. Results: The computational time of the prediction algorithms, for a patient plan with 350 control points and 60×60×42cm^3 CT volume, is 2–3minutes on CPU and <27 seconds on GPU for 1024×768 images. The verification software requires a maximum of ∼9ms and ∼19ms for 512×384 and 1024×768 resolution images, respectively, to perform image analysis and dosimetric validations. Typical variations in geometric parameters between reference and the measured images are 0.32°for gantry rotation, 1.006 for scaling factor, and 0.67mm for translation. For excess out-of-field/missing in-field fluence, with masks extending 1mm (at isocenter) from the detected aperture edge, the average total in-field area missing EPID fluence was 1.5mm2 the out-of-field excess EPID fluence was 8mm^2, both below error tolerances. Conclusion: A real-time verification software, with

  17. System design description for Waste Information and Control System

    International Nuclear Information System (INIS)

    Harris, R.R.

    1994-01-01

    The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as the Waste Information and Control System (WICS). WICS shall partially automate the procedure for acquisition, tracking and reporting of the container, drum, and waste data that is currently manually processed. The WICS project shall use handheld computer units (HCU) to collect laboratory data, a local database with an user friendly interface to import the laboratory data from the HCUs, and barcode technology with associated software and operational procedures. After the container, drum, and waste data has been collected and verified, WICS shall be manipulated to provide informal reports containing data required to properly document waste disposal. 8 refs, 82 figs, 69 tabs

  18. Analysis, Simulation, and Verification of Knowledge-Based, Rule-Based, and Expert Systems

    Science.gov (United States)

    Hinchey, Mike; Rash, James; Erickson, John; Gracanin, Denis; Rouff, Chris

    2010-01-01

    Mathematically sound techniques are used to view a knowledge-based system (KBS) as a set of processes executing in parallel and being enabled in response to specific rules being fired. The set of processes can be manipulated, examined, analyzed, and used in a simulation. The tool that embodies this technology may warn developers of errors in their rules, but may also highlight rules (or sets of rules) in the system that are underspecified (or overspecified) and need to be corrected for the KBS to operate as intended. The rules embodied in a KBS specify the allowed situations, events, and/or results of the system they describe. In that sense, they provide a very abstract specification of a system. The system is implemented through the combination of the system specification together with an appropriate inference engine, independent of the algorithm used in that inference engine. Viewing the rule base as a major component of the specification, and choosing an appropriate specification notation to represent it, reveals how additional power can be derived from an approach to the knowledge-base system that involves analysis, simulation, and verification. This innovative approach requires no special knowledge of the rules, and allows a general approach where standardized analysis, verification, simulation, and model checking techniques can be applied to the KBS.

  19. The help of simulation codes in designing waste assay systems using neutron measurement methods: Application to the alpha low level waste assay system PROMETHEE 6

    Energy Technology Data Exchange (ETDEWEB)

    Mariani, A.; Passard, C.; Jallu, F. E-mail: fanny.jallu@cea.fr; Toubon, H

    2003-11-01

    The design of a specific nuclear assay system for a dedicated application begins with a phase of development, which relies on information from the literature or on knowledge resulting from experience, and on specific experimental verifications. The latter ones may require experimental devices which can be restricting in terms of deadline, cost and safety. One way generally chosen to bypass these difficulties is to use simulation codes to study particular aspects. This paper deals with the potentialities offered by the simulation in the case of a passive-active neutron (PAN) assay system for alpha low level waste characterization; this system has been carried out at the Nuclear Measurements Development Laboratory of the French Atomic Energy Commission. Due to the high number of parameters to be taken into account for its development, this is a particularly sophisticated example. Since the PAN assay system, called PROMETHEE (prompt epithermal and thermal interrogation experiment), must have a detection efficiency of more than 20% and preserve a high level of modularity for various applications, an improved version has been studied using the MCNP4 (Monte Carlo N-Particle) transport code. Parameters such as the dimensions of the assay system, of the cavity and of the detection blocks, and the thicknesses of the nuclear materials of neutronic interest have been optimised. Therefore, the number of necessary experiments was reduced.

  20. The help of simulation codes in designing waste assay systems using neutron measurement methods: Application to the alpha low level waste assay system PROMETHEE 6

    International Nuclear Information System (INIS)

    Mariani, A.; Passard, C.; Jallu, F.; Toubon, H.

    2003-01-01

    The design of a specific nuclear assay system for a dedicated application begins with a phase of development, which relies on information from the literature or on knowledge resulting from experience, and on specific experimental verifications. The latter ones may require experimental devices which can be restricting in terms of deadline, cost and safety. One way generally chosen to bypass these difficulties is to use simulation codes to study particular aspects. This paper deals with the potentialities offered by the simulation in the case of a passive-active neutron (PAN) assay system for alpha low level waste characterization; this system has been carried out at the Nuclear Measurements Development Laboratory of the French Atomic Energy Commission. Due to the high number of parameters to be taken into account for its development, this is a particularly sophisticated example. Since the PAN assay system, called PROMETHEE (prompt epithermal and thermal interrogation experiment), must have a detection efficiency of more than 20% and preserve a high level of modularity for various applications, an improved version has been studied using the MCNP4 (Monte Carlo N-Particle) transport code. Parameters such as the dimensions of the assay system, of the cavity and of the detection blocks, and the thicknesses of the nuclear materials of neutronic interest have been optimised. Therefore, the number of necessary experiments was reduced

  1. A GIS support system for declaration and verification

    International Nuclear Information System (INIS)

    Poucet, A.; Contini, S.; Bellezza, F.

    2001-01-01

    Full text: The timely detection of a diversion of a significant amount of nuclear material from the civil cycle represents a complex activity that requires the use of powerful support systems. In this field the authors developed SIT (Safeguards Inspection Tool), an integrated platform for collecting, managing and analysing data from a variety of sources to support declarations and verification activities. Information dealt with is that requested by both INFCIRC/153 and INFCIRC/540 protocols. SIT is based on a low-cost Geographic Information System platform and extensive use is made of commercial software to reduce maintenance costs. The system has been developed using ARCVIEW GIS for Windows NT platforms. SIT is conceived as an integrator of multimedia information stored into local and remote databases; efforts have been focused on the automation of several tasks in order to produce a user-friendly system. Main characteristics of SIT are: Capability to deal with multimedia data, e.g. text, images, video, using user-selected COTS; Easy access to external databases, e.g. Oracle, Informix, Sybase, MS-Access, directly from the site map; Selected access to open source information via Internet; Capability to easily geo-reference site maps, to generate thematic layers of interest and to perform spatial analysis; Capability of performing aerial and satellite image analysis operations, e.g. rectification, change detection, feature extraction; Capability to easily add and run external models for e.g. material data accounting, completeness check, air dispersion models, material flow graph generation and to describe results in graphical form; Capability to use a Geo-positioning systems (GPS) with a portable computer, SIT is at an advanced stage of development and will be very soon interfaced with VERITY, a powerful Web search engine in order to allow open source information retrieval from geographical maps. The paper will describe the main features of SIT and the advantages of

  2. A GIS support system for declaration and verification

    Energy Technology Data Exchange (ETDEWEB)

    Poucet, A; Contini, S; Bellezza, F [European Commission, Joint Research Centre, Institute for Systems Informatics and Safety (ISIS), Ispra (Italy)

    2001-07-01

    Full text: The timely detection of a diversion of a significant amount of nuclear material from the civil cycle represents a complex activity that requires the use of powerful support systems. In this field the authors developed SIT (Safeguards Inspection Tool), an integrated platform for collecting, managing and analysing data from a variety of sources to support declarations and verification activities. Information dealt with is that requested by both INFCIRC/153 and INFCIRC/540 protocols. SIT is based on a low-cost Geographic Information System platform and extensive use is made of commercial software to reduce maintenance costs. The system has been developed using ARCVIEW GIS for Windows NT platforms. SIT is conceived as an integrator of multimedia information stored into local and remote databases; efforts have been focused on the automation of several tasks in order to produce a user-friendly system. Main characteristics of SIT are: Capability to deal with multimedia data, e.g. text, images, video, using user-selected COTS; Easy access to external databases, e.g. Oracle, Informix, Sybase, MS-Access, directly from the site map; Selected access to open source information via Internet; Capability to easily geo-reference site maps, to generate thematic layers of interest and to perform spatial analysis; Capability of performing aerial and satellite image analysis operations, e.g. rectification, change detection, feature extraction; Capability to easily add and run external models for e.g. material data accounting, completeness check, air dispersion models, material flow graph generation and to describe results in graphical form; Capability to use a Geo-positioning systems (GPS) with a portable computer, SIT is at an advanced stage of development and will be very soon interfaced with VERITY, a powerful Web search engine in order to allow open source information retrieval from geographical maps. The paper will describe the main features of SIT and the advantages of

  3. Analytical method of waste allocation in waste management systems: Concept, method and case study

    Energy Technology Data Exchange (ETDEWEB)

    Bergeron, Francis C., E-mail: francis.b.c@videotron.ca

    2017-01-15

    Waste is not a rejected item to dispose anymore but increasingly a secondary resource to exploit, influencing waste allocation among treatment operations in a waste management (WM) system. The aim of this methodological paper is to present a new method for the assessment of the WM system, the “analytical method of the waste allocation process” (AMWAP), based on the concept of the “waste allocation process” defined as the aggregation of all processes of apportioning waste among alternative waste treatment operations inside or outside the spatial borders of a WM system. AMWAP contains a conceptual framework and an analytical approach. The conceptual framework includes, firstly, a descriptive model that focuses on the description and classification of the WM system. It includes, secondly, an explanatory model that serves to explain and to predict the operation of the WM system. The analytical approach consists of a step-by-step analysis for the empirical implementation of the conceptual framework. With its multiple purposes, AMWAP provides an innovative and objective modular method to analyse a WM system which may be integrated in the framework of impact assessment methods and environmental systems analysis tools. Its originality comes from the interdisciplinary analysis of the WAP and to develop the conceptual framework. AMWAP is applied in the framework of an illustrative case study on the household WM system of Geneva (Switzerland). It demonstrates that this method provides an in-depth and contextual knowledge of WM. - Highlights: • The study presents a new analytical method based on the waste allocation process. • The method provides an in-depth and contextual knowledge of the waste management system. • The paper provides a reproducible procedure for professionals, experts and academics. • It may be integrated into impact assessment or environmental system analysis tools. • An illustrative case study is provided based on household waste

  4. Analytical method of waste allocation in waste management systems: Concept, method and case study

    International Nuclear Information System (INIS)

    Bergeron, Francis C.

    2017-01-01

    Waste is not a rejected item to dispose anymore but increasingly a secondary resource to exploit, influencing waste allocation among treatment operations in a waste management (WM) system. The aim of this methodological paper is to present a new method for the assessment of the WM system, the “analytical method of the waste allocation process” (AMWAP), based on the concept of the “waste allocation process” defined as the aggregation of all processes of apportioning waste among alternative waste treatment operations inside or outside the spatial borders of a WM system. AMWAP contains a conceptual framework and an analytical approach. The conceptual framework includes, firstly, a descriptive model that focuses on the description and classification of the WM system. It includes, secondly, an explanatory model that serves to explain and to predict the operation of the WM system. The analytical approach consists of a step-by-step analysis for the empirical implementation of the conceptual framework. With its multiple purposes, AMWAP provides an innovative and objective modular method to analyse a WM system which may be integrated in the framework of impact assessment methods and environmental systems analysis tools. Its originality comes from the interdisciplinary analysis of the WAP and to develop the conceptual framework. AMWAP is applied in the framework of an illustrative case study on the household WM system of Geneva (Switzerland). It demonstrates that this method provides an in-depth and contextual knowledge of WM. - Highlights: • The study presents a new analytical method based on the waste allocation process. • The method provides an in-depth and contextual knowledge of the waste management system. • The paper provides a reproducible procedure for professionals, experts and academics. • It may be integrated into impact assessment or environmental system analysis tools. • An illustrative case study is provided based on household waste

  5. SITE GENERATED RADIOLOGICAL WASTE HANDLING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. C. Khamankar

    2000-06-20

    The Site Generated Radiological Waste Handling System handles radioactive waste products that are generated at the geologic repository operations area. The waste is collected, treated if required, packaged for shipment, and shipped to a disposal site. Waste streams include low-level waste (LLW) in solid and liquid forms, as-well-as mixed waste that contains hazardous and radioactive constituents. Liquid LLW is segregated into two streams, non-recyclable and recyclable. The non-recyclable stream may contain detergents or other non-hazardous cleaning agents and is packaged for shipment. The recyclable stream is treated to recycle a large portion of the water while the remaining concentrated waste is packaged for shipment; this greatly reduces the volume of waste requiring disposal. There will be no liquid LLW discharge. Solid LLW consists of wet solids such as ion exchange resins and filter cartridges, as-well-as dry active waste such as tools, protective clothing, and poly bags. Solids will be sorted, volume reduced, and packaged for shipment. The generation of mixed waste at the Monitored Geologic Repository (MGR) is not planned; however, if it does come into existence, it will be collected and packaged for disposal at its point of occurrence, temporarily staged, then shipped to government-approved off-site facilities for disposal. The Site Generated Radiological Waste Handling System has equipment located in both the Waste Treatment Building (WTB) and in the Waste Handling Building (WHB). All types of liquid and solid LLW are processed in the WTB, while wet solid waste from the Pool Water Treatment and Cooling System is packaged where received in the WHB. There is no installed hardware for mixed waste. The Site Generated Radiological Waste Handling System receives waste from locations where water is used for decontamination functions. In most cases the water is piped back to the WTB for processing. The WTB and WHB provide staging areas for storing and shipping LLW

  6. SITE GENERATED RADIOLOGICAL WASTE HANDLING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    S. C. Khamankar

    2000-01-01

    The Site Generated Radiological Waste Handling System handles radioactive waste products that are generated at the geologic repository operations area. The waste is collected, treated if required, packaged for shipment, and shipped to a disposal site. Waste streams include low-level waste (LLW) in solid and liquid forms, as-well-as mixed waste that contains hazardous and radioactive constituents. Liquid LLW is segregated into two streams, non-recyclable and recyclable. The non-recyclable stream may contain detergents or other non-hazardous cleaning agents and is packaged for shipment. The recyclable stream is treated to recycle a large portion of the water while the remaining concentrated waste is packaged for shipment; this greatly reduces the volume of waste requiring disposal. There will be no liquid LLW discharge. Solid LLW consists of wet solids such as ion exchange resins and filter cartridges, as-well-as dry active waste such as tools, protective clothing, and poly bags. Solids will be sorted, volume reduced, and packaged for shipment. The generation of mixed waste at the Monitored Geologic Repository (MGR) is not planned; however, if it does come into existence, it will be collected and packaged for disposal at its point of occurrence, temporarily staged, then shipped to government-approved off-site facilities for disposal. The Site Generated Radiological Waste Handling System has equipment located in both the Waste Treatment Building (WTB) and in the Waste Handling Building (WHB). All types of liquid and solid LLW are processed in the WTB, while wet solid waste from the Pool Water Treatment and Cooling System is packaged where received in the WHB. There is no installed hardware for mixed waste. The Site Generated Radiological Waste Handling System receives waste from locations where water is used for decontamination functions. In most cases the water is piped back to the WTB for processing. The WTB and WHB provide staging areas for storing and shipping LLW

  7. Incinerator development program for processing transuranic waste at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hedahl, T.G.

    1982-01-01

    In the fall of 1981, two short-term tests were conducted on a controlled air and a rotary kiln incinerator to assess their potential for processing transuranic (TRU) contaminated waste at the Idaho National Engineering Laboratory (INEL). The primary purpose of the test program was a proof-of-principle verification that the incinerators could achieve near-complete combustion of the combustible portion of the waste, while mixed with high percentages of noncombustible and metal waste materials. Other important test objectives were to obtain system design information including off-gas and end-product characteristics and incinerator operating parameters. Approximately 7200 kg of simulated (non-TRU) waste from the INEL were processed during the two tests

  8. A discussion on the proposal of construction of a verification facility at CIAE for the AD-RCNPS R and D

    International Nuclear Information System (INIS)

    Ding Dazhao

    2000-01-01

    ADS is a prospective innovative nuclear power system based on the development of high power proton accelerator and well developed technology of power reactor. Its advantage and benefit in respect of waste transmutation and fuel breeding were recognized by international nuclear community. ADS provides more flexibility from viewpoint of operation and control. To made ADS to be a reliable one, a series of important problem in the components of ADS--accelerator, reactor, material and neutron physics are enumerated. The R and D of a new nuclear power system is a long term activity, including conceptual study, verification of the principle, experimental facility, prototype and commercial demonstration. To construction a verification facility is an essential step in promoting the R and D of ADS from conceptual study to technical comprehension. A verification facility that consisted of a swimming pool reactor at CIAE driven by a pulsed low energy high current accelerator is proposed. According to those experiments that should be carried out at this facility, the specifications of accelerator and the modification of the reactor core structure are given

  9. Criticality safety analysis of accelerator transmutation waste system

    International Nuclear Information System (INIS)

    Landeyro, P.A.; Cepraga, D.G.; Orazi, A.

    1993-01-01

    The Accelerator Transmutation Waste system (ATW) is under development at the Los Alamos National Laboratory. It consists of a particle accelerator producing a proton beam having an energy of 1.5 GeV. These particles are introduced into the upper part of a molten Pb-Bi column and they produce, by a spallation reaction, a high strength neutron flux, 1.0x10 16 n/(square centimeters sec). The neutrons enter a heavy water blanket where actinides and long-lived fission products circulate in vertical tubes. The goal of this research effort is to perform an independent verification of the feasibility of actinide burning in the ATW system. The work is divided into four tasks: a) production of an actinide and long-lived fission product cross section library from JEF 2.2; b) simulation, using MCNP and KENO IV Monte Carlo codes, of the ATW configurations existing in literature; c) validation of the cross sections by comparison of Keff and reaction rate results, calculated with MCNP and KENO IV, with experimental benchmarks and intercomparison between calculations of a PWR unit cell and the computations carried out with various codes and cross section libraries (NEACRF criticality working group data); d) simulation of the ATW configuration. The two first tasks are almost complete with excellent agreement between this study's results and those of Los Alamos

  10. Multiple system modelling of waste management

    International Nuclear Information System (INIS)

    Eriksson, Ola; Bisaillon, Mattias

    2011-01-01

    Highlights: → Linking of models will provide a more complete, correct and credible picture of the systems. → The linking procedure is easy to perform and also leads to activation of project partners. → The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions have developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.

  11. Nuclear disarmament verification

    International Nuclear Information System (INIS)

    DeVolpi, A.

    1993-01-01

    Arms control treaties, unilateral actions, and cooperative activities -- reflecting the defusing of East-West tensions -- are causing nuclear weapons to be disarmed and dismantled worldwide. In order to provide for future reductions and to build confidence in the permanency of this disarmament, verification procedures and technologies would play an important role. This paper outlines arms-control objectives, treaty organization, and actions that could be undertaken. For the purposes of this Workshop on Verification, nuclear disarmament has been divided into five topical subareas: Converting nuclear-weapons production complexes, Eliminating and monitoring nuclear-weapons delivery systems, Disabling and destroying nuclear warheads, Demilitarizing or non-military utilization of special nuclear materials, and Inhibiting nuclear arms in non-nuclear-weapons states. This paper concludes with an overview of potential methods for verification

  12. 300 Area Process Trenches Verification Package

    International Nuclear Information System (INIS)

    Lerch, J.A.

    1998-03-01

    The purpose of this verification package is to document achievement of the remedial action objectives for the 300 Area Process Trenches (300 APT) located within the 300-FF-1 Operable Unit (OU). The 300 APT became active in 1975 as a replacement for the North and South Process Pond system that is also part of the 300-FF-1 OU. The trenches received 300 Area process effluent from the uranium fuel fabrication facilities. Waste from the 300 Area laboratories that was determined to be below discharge limits based on monitoring performed at the 307 retention basin was also released to the trenches. Effluent flowed through the headworks sluice gates, down a concrete apron, and into the trenches. From the beginning of operations in 1975 until 1993, a continuous, composite sampler was located at the headwork structure to analyze process effluent at the point of discharge to the environment

  13. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    J. D. Bigbee

    2000-06-21

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status.

  14. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    J. D. Bigbee

    2000-01-01

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status

  15. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  16. USING PERFLUOROCARBON TRACERS FOR VERIFICATION OF CAP AND COVER SYSTEMS PERFORMANCE

    International Nuclear Information System (INIS)

    HEISER, J.; SULLIVAN, T.

    2001-01-01

    The Department of Energy (DOE) Environmental Management (EM) office has committed itself to an accelerated cleanup of its national facilities. The goal is to have much of the DOE legacy waste sites remediated by 2006. This includes closure of several sites (e.g., Rocky Flats and Fernald). With the increased focus on accelerated cleanup, there has been considerable concern about long-term stewardship issues in general, and verification and long-term monitoring (LTM) of caps and covers, in particular. Cap and cover systems (covers) are vital remedial options that will be extensively used in meeting these 2006 cleanup goals. Every buried waste site within the DOE complex will require some form of cover system. These covers are expected to last from 100 to 1000 years or more. The stakeholders can be expected to focus on system durability and sustained performance. DOE EM has set up a national committee of experts to develop a long-term capping (LTC) guidance document. Covers are subject to subsidence, erosion, desiccation, animal intrusion, plant root infiltration, etc., all of which will affect the overall performance of the cover. Very little is available in terms of long-term monitoring other than downstream groundwater or surface water monitoring. By its very nature, this can only indicate that failure of the cover system has already occurred and contaminants have been transported away from the site. This is unacceptable. Methods that indicate early cover failure (prior to contaminant release) or predict approaching cover failure are needed. The LTC committee has identified predictive monitoring technologies as a high priority need for DOE, both for new covers as well as existing covers. The same committee identified a Brookhaven National Laboratory (BNL) technology as one approach that may be capable of meeting the requirements for LTM. The Environmental Research and Technology Division (ERTD) at BNL developed a novel methodology for verifying and monitoring

  17. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  18. Television systems for radioactive waste management

    International Nuclear Information System (INIS)

    Quartly, J.R.

    1989-01-01

    Radiation-tolerant television cameras, widely used for the inspection of nuclear plants, are now used for monitoring radioactive waste management processes. Two systems are described in this paper that differ in the methods of maintaining the camera equipment. At the British Nuclear Fuels plc (BNFL) Sellafield plant, a major capital investment program is under way that includes plants for spent-fuel reprocessing and radioactive waste management. The Windscale vitrification plant (WVP) will convert highly active liquid waste to a solid glass-like form. The WVP television system was based on in-cell cameras designed to be removable by remote-handling equipment. The plant to encapsulate medium active solid waste, encapsulation plant 1 (EP1) used through-wall and through-roof viewing systems with a glass viewing dome as the biological shield, allowing the camera and optics to be withdrawn to a safe area for maintenance. Both systems used novel techniques to obtain a record of the waste-processing operations. The WVP system used a microcomputer to overlay reference information onto the television picture and a motion detector to automatically trigger the video recording. The television system for EP1 included automatic character recognition to generate a computer data record of drum serial numbers

  19. Verification of the network flow and transport/distributed velocity (NWFT/DVM) computer code

    International Nuclear Information System (INIS)

    Duda, L.E.

    1984-05-01

    The Network Flow and Transport/Distributed Velocity Method (NWFT/DVM) computer code was developed primarily to fulfill a need for a computationally efficient ground-water flow and contaminant transport capability for use in risk analyses where, quite frequently, large numbers of calculations are required. It is a semi-analytic, quasi-two-dimensional network code that simulates ground-water flow and the transport of dissolved species (radionuclides) in a saturated porous medium. The development of this code was carried out under a program funded by the US Nuclear Regulatory Commission (NRC) to develop a methodology for assessing the risk from disposal of radioactive wastes in deep geologic formations (FIN: A-1192 and A-1266). In support to the methodology development program, the NRC has funded a separate Maintenance of Computer Programs Project (FIN: A-1166) to ensure that the codes developed under A-1192 or A-1266 remain consistent with current operating systems, are as error-free as possible, and have up-to-date documentations for reference by the NRC staff. Part of this effort would include verification and validation tests to assure that a code correctly performs the operations specified and/or is representing the processes or system for which it is intended. This document contains four verification problems for the NWFT/DVM computer code. Two of these problems are analytical verifications of NWFT/DVM where results are compared to analytical solutions. The other two are code-to-code verifications where results from NWFT/DVM are compared to those of another computer code. In all cases NWFT/DVM showed good agreement with both the analytical solutions and the results from the other code

  20. Review of waste package verification tests. Semiannual report, April 1985-September 1985

    International Nuclear Information System (INIS)

    Soo, P.

    1986-01-01

    Several studies were completed this period to evaluate experimental and analytical methodologies being used in the DOE waste package program. The first involves a determination of the relevance of the test conditions being used by DOE to characterize waste package component behavior in a salt repository system. Another study focuses on the testing conditions and procedures used to measure radionuclide solubility and colloid formation in repository groundwaters. An attempt was also made to evaluate the adequacy of selected waste package performance codes. However, the latter work was limited by an inability to obtain several codes from DOE. Nevertheless, it was possible to comment briefly on the structures and intents of the codes based on publications in the open literature. The final study involved an experimental program to determine the likelihood of stress-corrosion cracking of austenitic stainless steels and Incoloy 825 in simulated tuff repository environments. Tests for six-month exposure periods in water and air-steam conditions are described. 52 figs., 48 tabs

  1. Determination of the optimal area of waste incineration in a rotary kiln using a simulation model.

    Science.gov (United States)

    Bujak, J

    2015-08-01

    The article presents a mathematical model to determine the flux of incinerated waste in terms of its calorific values. The model is applicable in waste incineration systems equipped with rotary kilns. It is based on the known and proven energy flux balances and equations that describe the specific losses of energy flux while considering the specificity of waste incineration systems. The model is universal as it can be used both for the analysis and testing of systems burning different types of waste (municipal, medical, animal, etc.) and for allowing the use of any kind of additional fuel. Types of waste incinerated and additional fuel are identified by a determination of their elemental composition. The computational model has been verified in three existing industrial-scale plants. Each system incinerated a different type of waste. Each waste type was selected in terms of a different calorific value. This allowed the full verification of the model. Therefore the model can be used to optimize the operation of waste incineration system both at the design stage and during its lifetime. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. Transportable Vitrification System Demonstration on Mixed Waste

    International Nuclear Information System (INIS)

    Zamecnik, J.R.; Whitehouse, J.C.; Wilson, C.N.; Van Ryn, F.R.

    1998-01-01

    This paper describes preliminary results from the first demonstration of the Transportable Vitrification System (TVS) on actual mixed waste. The TVS is a fully integrated, transportable system for the treatment of mixed and low-level radioactive wastes. The demonstration was conducted at Oak Ridge's East Tennessee Technology Park (ETTP), formerly known as the K-25 site. The purpose of the demonstration was to show that mixed wastes could be vitrified safely on a 'field' scale using joule-heated melter technology and obtain information on system performance, waste form durability, air emissions, and costs

  3. Guidelines for the verification and validation of expert system software and conventional software: Bibliography. Volume 8

    International Nuclear Information System (INIS)

    Miller, L.A.; Hayes, J.E.; Mirsky, S.M.

    1995-03-01

    This volume contains all of the technical references found in Volumes 1-7 concerning the development of guidelines for the verification and validation of expert systems, knowledge-based systems, other AI systems, object-oriented systems, and conventional systems

  4. Guidelines for the verification and validation of expert system software and conventional software: Bibliography. Volume 8

    Energy Technology Data Exchange (ETDEWEB)

    Miller, L.A.; Hayes, J.E.; Mirsky, S.M. [Science Applications International Corp., McLean, VA (United States)

    1995-03-01

    This volume contains all of the technical references found in Volumes 1-7 concerning the development of guidelines for the verification and validation of expert systems, knowledge-based systems, other AI systems, object-oriented systems, and conventional systems.

  5. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    International Nuclear Information System (INIS)

    HARMSEN, R.W.

    1999-01-01

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement

  6. Municipal solid waste management system: decision support through systems analysis

    OpenAIRE

    Pires, Ana Lúcia Lourenço

    2010-01-01

    Thesis submitted to the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia for the degree of Doctor of Philosophy in Environmental Engineering The present study intends to show the development of systems analysis model applied to solid waste management system, applied into AMARSUL, a solid waste management system responsible for the management of municipal solid waste produced in Setúbal peninsula, Portugal. The model developed intended to promote sustainable decision making, ...

  7. ANALYSIS OF SPECIAL WASTE CONFIGURATIONS AT THE SRS WASTE MANAGEMENT FACILITIES

    International Nuclear Information System (INIS)

    Casella, V; Raymond Dewberry, R

    2007-01-01

    Job Control Waste (JCW) at the Savannah River Site (SRS) Solid Waste Management Facilities (SWMF) may be disposed of in special containers, and the analysis of these containers requires developing specific analysis methodologies. A method has been developed for the routine assay of prohibited items (liquids, etc.) contained in a 30-gallon drum that is then placed into a 55-gallon drum. Method development consisted of system calibration with a NIST standard at various drum-to-detector distances, method verification with a liquid sample containing a known amount of Pu-238, and modeling the inner container using Ortec Isotopic software. Using this method for measurement of the known standard in the drum-in-drum configuration produced excellent agreement (within 15%) with the known value. Savannah River Site Solid Waste Management also requested analysis of waste contained in large black boxes (commonly 18-feet x 12-feet x 7-feet) stored at the SWMF. These boxes are frequently stored in high background areas and background radiation must be considered for each analysis. A detection limit of less than 150 fissile-gram-equivalents (FGE) of TRU waste is required for the black-box analyses. There is usually excellent agreement for the measurements at different distances and measurement uncertainties of about 50% are obtained at distances of at least twenty feet from the box. This paper discusses the experimental setup, analysis and data evaluation for drum-in-drum and black box waste configurations at SRS

  8. Formal Modeling and Verification of Interlocking Systems Featuring Sequential Release

    DEFF Research Database (Denmark)

    Vu, Linh Hong; Haxthausen, Anne Elisabeth; Peleska, Jan

    2015-01-01

    In this paper, we present a method and an associated tool suite for formal verification of the new ETCS level 2 based Danish railway interlocking systems. We have made a generic and reconfigurable model of the system behavior and generic high-level safety properties. This model accommodates seque...... SMT based bounded model checking (BMC) and inductive reasoning, we are able to verify the properties for model instances corresponding to railway networks of industrial size. Experiments also show that BMC is efficient for finding bugs in the railway interlocking designs....

  9. Formal Modeling and Verification of Interlocking Systems Featuring Sequential Release

    DEFF Research Database (Denmark)

    Vu, Linh Hong; Haxthausen, Anne Elisabeth; Peleska, Jan

    2014-01-01

    In this paper, we present a method and an associated tool suite for formal verification of the new ETCS level 2 based Danish railway interlocking systems. We have made a generic and reconfigurable model of the system behavior and generic high-level safety properties. This model accommodates seque...... SMT based bounded model checking (BMC) and inductive reasoning, we are able to verify the properties for model instances corresponding to railway networks of industrial size. Experiments also show that BMC is efficient for finding bugs in the railway interlocking designs....

  10. The legal system of nuclear waste disposal

    International Nuclear Information System (INIS)

    Dauk, W.

    1983-01-01

    This doctoral thesis presents solutions to some of the legal problems encountered in the interpretation of the various laws and regulations governing nuclear waste disposal, and reveals the legal system supporting the variety of individual regulations. Proposals are made relating to modifications of problematic or not well defined provisions, in order to contribute to improved juridical security, or inambiguity in terms of law. The author also discusses the question of the constitutionality of the laws for nuclear waste disposal. Apart from the responsibility of private enterprise to contribute to safe treatment or recycling, within the framework of the integrated waste management concept, and apart from the Government's responsibility for interim or final storage of radioactive waste, there is a third possibility included in the legal system for waste management, namely voluntary measures taken by private enterprise for radioactive waste disposal. The licence to be applied for in accordance with section 3, sub-section (1) of the Radiation Protection Ordinance is interpreted to pertain to all measures of radioactive waste disposal, thus including final storage of radioactive waste by private companies. Although the terminology and systematic concept of nuclear waste disposal are difficult to understand, there is a functionable system of legal provisions contained therein. This system fits into the overall concept of laws governing technical safety and safety engineering. (orig./HSCH) [de

  11. Standard practices for verification of displacement measuring systems and devices used in material testing machines

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2005-01-01

    1.1 These practices cover procedures and requirements for the calibration and verification of displacement measuring systems by means of standard calibration devices for static and quasi-static testing machines. This practice is not intended to be complete purchase specifications for testing machines or displacement measuring systems. Displacement measuring systems are not intended to be used for the determination of strain. See Practice E83. 1.2 These procedures apply to the verification of the displacement measuring systems associated with the testing machine, such as a scale, dial, marked or unmarked recorder chart, digital display, etc. In all cases the buyer/owner/user must designate the displacement-measuring system(s) to be verified. 1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems m...

  12. Mobile waste inspection real time radiography system

    International Nuclear Information System (INIS)

    Vigil, J.; Taggart, D.; Betts, S.; Rael, C.; Martinez, F.; Mendez, J.

    1995-01-01

    The 450-KeV Mobile Real Time Radiography System was designed and purchased to inspect containers of radioactive waste produced at Los Alamos National Laboratory (LANL). The Mobile Real Time Radiography System has the capability of inspecting waste containers of various sizes from 5-gal. buckets to standard waste boxes (SWB, dimensions 54.5 in. x 71 in. x 37 in.). The fact that this unit is mobile makes it an attractive alternative to the costly road closures associated with moving waste from the waste generator to storage or disposal facilities

  13. Property-driven functional verification technique for high-speed vision system-on-chip processor

    Science.gov (United States)

    Nshunguyimfura, Victor; Yang, Jie; Liu, Liyuan; Wu, Nanjian

    2017-04-01

    The implementation of functional verification in a fast, reliable, and effective manner is a challenging task in a vision chip verification process. The main reason for this challenge is the stepwise nature of existing functional verification techniques. This vision chip verification complexity is also related to the fact that in most vision chip design cycles, extensive efforts are focused on how to optimize chip metrics such as performance, power, and area. Design functional verification is not explicitly considered at an earlier stage at which the most sound decisions are made. In this paper, we propose a semi-automatic property-driven verification technique. The implementation of all verification components is based on design properties. We introduce a low-dimension property space between the specification space and the implementation space. The aim of this technique is to speed up the verification process for high-performance parallel processing vision chips. Our experimentation results show that the proposed technique can effectively improve the verification effort up to 20% for the complex vision chip design while reducing the simulation and debugging overheads.

  14. Waste processing system for nuclear power plant

    International Nuclear Information System (INIS)

    Higashinakagawa, Emiko; Tezuka, Fuminobu; Maesawa, Yukishige; Irie, Hiromitsu; Daibu, Etsuji.

    1996-01-01

    The present invention concerns a waste processing system of a nuclear power plant, which can reduce the volume of a large amount of plastics without burying them. Among burnable wastes and plastic wastes to be discarded in the power plant located on the sea side, the plastic wastes are heated and converted into oils, and the burnable wastes are burnt using the oils as a fuel. The system is based on the finding that the presence of Na 2 O, K 2 O contained in the wastes catalytically improves the efficiency of thermal decomposition in a heating atmosphere, in the method of heating plastics and converting them into oils. (T.M.)

  15. Assertion based verification methodology for HDL designs of primary sodium pump speed and eddy current flow measurement systems of PFBR

    International Nuclear Information System (INIS)

    Misra, M.K.; Menon, Saritha P.; Thirugnana Murthy, D.

    2013-01-01

    With the growing complexity and size of digital designs, functional verification has become a huge challenge. The validation and testing process accounts for a significant percentage of the overall development effort and cost for electronic systems. Many studies have shown that up to 70% of the design development time and resources are spent on functional verification. Functional errors manifest themselves very early in the design flow, and unless they are detected upfront, they can result in severe consequences - both financially and from a safety viewpoint. This paper covers the various types of verification methodologies and focuses on Assertion Based Verification Methodology for HDL designs, taking as case studies, the Primary Sodium Pump Speed and Eddy Current Flow Measurement Systems of PFBR. (author)

  16. A system for EPID-based real-time treatment delivery verification during dynamic IMRT treatment

    Energy Technology Data Exchange (ETDEWEB)

    Fuangrod, Todsaporn [Faculty of Engineering and Built Environment, School of Electrical Engineering and Computer Science, the University of Newcastle, NSW 2308 (Australia); Woodruff, Henry C.; O’Connor, Daryl J. [Faculty of Science and IT, School of Mathematical and Physical Sciences, the University of Newcastle, NSW 2308 (Australia); Uytven, Eric van; McCurdy, Boyd M. C. [Division of Medical Physics, CancerCare Manitoba, 675 McDermot Avenue, Winnipeg, Manitoba R3E 0V9 (Canada); Department of Physics and Astronomy, University of Manitoba, Winnipeg, Manitoba R3T 2N2 (Canada); Department of Radiology, University of Manitoba, Winnipeg, Manitoba R3T 2N2 (Canada); Kuncic, Zdenka [School of Physics, University of Sydney, Sydney, NSW 2006 (Australia); Greer, Peter B. [Faculty of Science and IT, School of Mathematical and Physical Sciences, the University of Newcastle, NSW 2308, Australia and Department of Radiation Oncology, Calvary Mater Newcastle Hospital, Locked Bag 7, Hunter region Mail Centre, Newcastle, NSW 2310 (Australia)

    2013-09-15

    Purpose: To design and develop a real-time electronic portal imaging device (EPID)-based delivery verification system for dynamic intensity modulated radiation therapy (IMRT) which enables detection of gross treatment delivery errors before delivery of substantial radiation to the patient.Methods: The system utilizes a comprehensive physics-based model to generate a series of predicted transit EPID image frames as a reference dataset and compares these to measured EPID frames acquired during treatment. The two datasets are using MLC aperture comparison and cumulative signal checking techniques. The system operation in real-time was simulated offline using previously acquired images for 19 IMRT patient deliveries with both frame-by-frame comparison and cumulative frame comparison. Simulated error case studies were used to demonstrate the system sensitivity and performance.Results: The accuracy of the synchronization method was shown to agree within two control points which corresponds to approximately ∼1% of the total MU to be delivered for dynamic IMRT. The system achieved mean real-time gamma results for frame-by-frame analysis of 86.6% and 89.0% for 3%, 3 mm and 4%, 4 mm criteria, respectively, and 97.9% and 98.6% for cumulative gamma analysis. The system can detect a 10% MU error using 3%, 3 mm criteria within approximately 10 s. The EPID-based real-time delivery verification system successfully detected simulated gross errors introduced into patient plan deliveries in near real-time (within 0.1 s).Conclusions: A real-time radiation delivery verification system for dynamic IMRT has been demonstrated that is designed to prevent major mistreatments in modern radiation therapy.

  17. A system for EPID-based real-time treatment delivery verification during dynamic IMRT treatment

    International Nuclear Information System (INIS)

    Fuangrod, Todsaporn; Woodruff, Henry C.; O’Connor, Daryl J.; Uytven, Eric van; McCurdy, Boyd M. C.; Kuncic, Zdenka; Greer, Peter B.

    2013-01-01

    Purpose: To design and develop a real-time electronic portal imaging device (EPID)-based delivery verification system for dynamic intensity modulated radiation therapy (IMRT) which enables detection of gross treatment delivery errors before delivery of substantial radiation to the patient.Methods: The system utilizes a comprehensive physics-based model to generate a series of predicted transit EPID image frames as a reference dataset and compares these to measured EPID frames acquired during treatment. The two datasets are using MLC aperture comparison and cumulative signal checking techniques. The system operation in real-time was simulated offline using previously acquired images for 19 IMRT patient deliveries with both frame-by-frame comparison and cumulative frame comparison. Simulated error case studies were used to demonstrate the system sensitivity and performance.Results: The accuracy of the synchronization method was shown to agree within two control points which corresponds to approximately ∼1% of the total MU to be delivered for dynamic IMRT. The system achieved mean real-time gamma results for frame-by-frame analysis of 86.6% and 89.0% for 3%, 3 mm and 4%, 4 mm criteria, respectively, and 97.9% and 98.6% for cumulative gamma analysis. The system can detect a 10% MU error using 3%, 3 mm criteria within approximately 10 s. The EPID-based real-time delivery verification system successfully detected simulated gross errors introduced into patient plan deliveries in near real-time (within 0.1 s).Conclusions: A real-time radiation delivery verification system for dynamic IMRT has been demonstrated that is designed to prevent major mistreatments in modern radiation therapy

  18. Methodologies for Verification and Validation of Space Launch System (SLS) Structural Dynamic Models: Appendices

    Science.gov (United States)

    Coppolino, Robert N.

    2018-01-01

    Verification and validation (V&V) is a highly challenging undertaking for SLS structural dynamics models due to the magnitude and complexity of SLS subassemblies and subassemblies. Responses to challenges associated with V&V of Space Launch System (SLS) structural dynamics models are presented in Volume I of this paper. Four methodologies addressing specific requirements for V&V are discussed. (1) Residual Mode Augmentation (RMA). (2) Modified Guyan Reduction (MGR) and Harmonic Reduction (HR, introduced in 1976). (3) Mode Consolidation (MC). Finally, (4) Experimental Mode Verification (EMV). This document contains the appendices to Volume I.

  19. SU-E-T-435: Development and Commissioning of a Complete System for In-Vivo Dosimetry and Range Verification in Proton Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Samuel, D [Universite catholique de Louvain, Louvain-la-neuve, BW (Belgium); Testa, M; Park, Y [Massachusetts General Hospital, Boston, MA (United States); Schneider, R; Moteabbed, M [General Hospital, Boston, MA (United States); Janssens, G; Prieels, D [Ion Beam Applications, Louvain-la-neuve, Brabant Wallon (Belgium); Orban de Xivry, J [Universite catholique de Louvain, Louvain-la-neuve, BW (Belgium); Lu, H [Massachusetts General Hospital and Harvard Medical School, Boston, MA (United States); Bentefour, E

    2014-06-01

    Purpose: In-vivo dose and beam range verification in proton therapy could play significant roles in proton treatment validation and improvements. Invivo beam range verification, in particular, could enable new treatment techniques one of which, for example, could be the use of anterior fields for prostate treatment instead of opposed lateral fields as in current practice. We have developed and commissioned an integrated system with hardware, software and workflow protocols, to provide a complete solution, simultaneously for both in-vivo dosimetry and range verification for proton therapy. Methods: The system uses a matrix of diodes, up to 12 in total, but separable into three groups for flexibility in application. A special amplifier was developed to capture extremely small signals from very low proton beam current. The software was developed within iMagX, a general platform for image processing in radiation therapy applications. The range determination exploits the inherent relationship between the internal range modulation clock of the proton therapy system and the radiological depth at the point of measurement. The commissioning of the system, for in-vivo dosimetry and for range verification was separately conducted using anthropomorphic phantom. EBT films and TLDs were used for dose comparisons and range scan of the beam distal fall-off was used as ground truth for range verification. Results: For in-vivo dose measurement, the results were in agreement with TLD and EBT films and were within 3% from treatment planning calculations. For range verification, a precision of 0.5mm is achieved in homogeneous phantoms, and a precision of 2mm for anthropomorphic pelvic phantom, except at points with significant range mixing. Conclusion: We completed the commissioning of our system for in-vivo dosimetry and range verification in proton therapy. The results suggest that the system is ready for clinical trials on patient.

  20. SU-E-T-435: Development and Commissioning of a Complete System for In-Vivo Dosimetry and Range Verification in Proton Therapy

    International Nuclear Information System (INIS)

    Samuel, D; Testa, M; Park, Y; Schneider, R; Moteabbed, M; Janssens, G; Prieels, D; Orban de Xivry, J; Lu, H; Bentefour, E

    2014-01-01

    Purpose: In-vivo dose and beam range verification in proton therapy could play significant roles in proton treatment validation and improvements. Invivo beam range verification, in particular, could enable new treatment techniques one of which, for example, could be the use of anterior fields for prostate treatment instead of opposed lateral fields as in current practice. We have developed and commissioned an integrated system with hardware, software and workflow protocols, to provide a complete solution, simultaneously for both in-vivo dosimetry and range verification for proton therapy. Methods: The system uses a matrix of diodes, up to 12 in total, but separable into three groups for flexibility in application. A special amplifier was developed to capture extremely small signals from very low proton beam current. The software was developed within iMagX, a general platform for image processing in radiation therapy applications. The range determination exploits the inherent relationship between the internal range modulation clock of the proton therapy system and the radiological depth at the point of measurement. The commissioning of the system, for in-vivo dosimetry and for range verification was separately conducted using anthropomorphic phantom. EBT films and TLDs were used for dose comparisons and range scan of the beam distal fall-off was used as ground truth for range verification. Results: For in-vivo dose measurement, the results were in agreement with TLD and EBT films and were within 3% from treatment planning calculations. For range verification, a precision of 0.5mm is achieved in homogeneous phantoms, and a precision of 2mm for anthropomorphic pelvic phantom, except at points with significant range mixing. Conclusion: We completed the commissioning of our system for in-vivo dosimetry and range verification in proton therapy. The results suggest that the system is ready for clinical trials on patient

  1. Passive active neutron radioassay measurement uncertainty for combustible and glass waste matrices

    International Nuclear Information System (INIS)

    Blackwood, L.G.; Harker, Y.D.; Meachum, T.R.; Yoon, Woo Y.

    1997-01-01

    Using a modified statistical sampling and verification approach, total uncertainty of INEL's Passive Active Neutron (PAN) radioassay system was evaluated for combustible and glass content codes. Waste structure and content of 100 randomly selected drums in each the waste categories were computer modeled based on review of real-time radiography video tapes. Specific quantities of Pu were added to the drum models according to an experimental design. These drum models were then submitted to the Monte Carlo Neutron Photon code processing and subsequent calculations to produce simulated PAN system measurements. The reported Pu masses from the simulation runs were compared with the corresponding input masses. Analysis of the measurement errors produced uncertainty estimates. This paper presents results of the uncertainty calculations and compares them to previous reported results obtained for graphite waste

  2. DOE systems approach to a low-level waste management information system: summary paper

    International Nuclear Information System (INIS)

    Esparza, V.

    1987-01-01

    The LLWMP is performing an assessment of waste information systems currently in use at each DOE site for recording LLW data. The assessment is being conducted to determine what changes to the waste information systems, if any, are desirable to support implementation of this systems approach to LLW management. Recommendations will be made to DOE from this assessment and what would be involved to modify current DOE waste generator information practices to support an appropriately structured overall DOE LLW data systems. In support of reducing the uncertainty of decision-making, DOE has selected a systems approach to keep pace with an evolving regulatory climate to low-level waste. This approach considers the effects of each stage of the entire low-level waste management process. The proposed systems approach starts with the disposal side of the waste management system and progresses towards the waste generation side of the waste management system. Using this approach provides quantitative performance to be achieved. In addition, a systems approach also provides a method for selecting appropriate technology based on engineering models

  3. INEL test plan for evaluating waste assay systems

    International Nuclear Information System (INIS)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP

  4. INEL test plan for evaluating waste assay systems

    Energy Technology Data Exchange (ETDEWEB)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  5. Integrating Fingerprint Verification into the Smart Card-Based Healthcare Information System

    Directory of Open Access Journals (Sweden)

    Jin-Won Park

    2009-01-01

    Full Text Available As VLSI technology has been improved, a smart card employing 32-bit processors has been released, and more personal information such as medical, financial data can be stored in the card. Thus, it becomes important to protect personal information stored in the card. Verification of the card holder's identity using a fingerprint has advantages over the present practices of Personal Identification Numbers (PINs and passwords. However, the computational workload of fingerprint verification is much heavier than that of the typical PIN-based solution. In this paper, we consider three strategies to implement fingerprint verification in a smart card environment and how to distribute the modules of fingerprint verification between the smart card and the card reader. We first evaluate the number of instructions of each step of a typical fingerprint verification algorithm, and estimate the execution time of several cryptographic algorithms to guarantee the security/privacy of the fingerprint data transmitted in the smart card with the client-server environment. Based on the evaluation results, we analyze each scenario with respect to the security level and the real-time execution requirements in order to implement fingerprint verification in the smart card with the client-server environment.

  6. Integrating Fingerprint Verification into the Smart Card-Based Healthcare Information System

    Science.gov (United States)

    Moon, Daesung; Chung, Yongwha; Pan, Sung Bum; Park, Jin-Won

    2009-12-01

    As VLSI technology has been improved, a smart card employing 32-bit processors has been released, and more personal information such as medical, financial data can be stored in the card. Thus, it becomes important to protect personal information stored in the card. Verification of the card holder's identity using a fingerprint has advantages over the present practices of Personal Identification Numbers (PINs) and passwords. However, the computational workload of fingerprint verification is much heavier than that of the typical PIN-based solution. In this paper, we consider three strategies to implement fingerprint verification in a smart card environment and how to distribute the modules of fingerprint verification between the smart card and the card reader. We first evaluate the number of instructions of each step of a typical fingerprint verification algorithm, and estimate the execution time of several cryptographic algorithms to guarantee the security/privacy of the fingerprint data transmitted in the smart card with the client-server environment. Based on the evaluation results, we analyze each scenario with respect to the security level and the real-time execution requirements in order to implement fingerprint verification in the smart card with the client-server environment.

  7. Material integrity verification radar

    International Nuclear Information System (INIS)

    Koppenjan, S.K.

    1999-01-01

    The International Atomic Energy Agency (IAEA) has the need for verification of 'as-built' spent fuel-dry storage containers and other concrete structures. The IAEA has tasked the Special Technologies Laboratory (STL) to fabricate, test, and deploy a stepped-frequency Material Integrity Verification Radar (MIVR) system to nondestructively verify the internal construction of these containers. The MIVR system is based on previously deployed high-frequency, ground penetrating radar (GPR) systems that have been developed by STL for the U.S. Department of Energy (DOE). Whereas GPR technology utilizes microwave radio frequency energy to create subsurface images, MTVR is a variation for which the medium is concrete instead of soil. The purpose is to nondestructively verify the placement of concrete-reinforcing materials, pipes, inner liners, and other attributes of the internal construction. The MIVR system underwent an initial field test on CANDU reactor spent fuel storage canisters at Atomic Energy of Canada Limited (AECL), Chalk River Laboratories, Ontario, Canada, in October 1995. A second field test at the Embalse Nuclear Power Plant in Embalse, Argentina, was completed in May 1996. The DOE GPR also was demonstrated at the site. Data collection and analysis were performed for the Argentine National Board of Nuclear Regulation (ENREN). IAEA and the Brazilian-Argentine Agency for the Control and Accounting of Nuclear Material (ABACC) personnel were present as observers during the test. Reinforcing materials were evident in the color, two-dimensional images produced by the MIVR system. A continuous pattern of reinforcing bars was evident and accurate estimates on the spacing, depth, and size were made. The potential uses for safeguard applications were jointly discussed. The MIVR system, as successfully demonstrated in the two field tests, can be used as a design verification tool for IAEA safeguards. A deployment of MIVR for Design Information Questionnaire (DIQ

  8. Face Verification for Mobile Personal Devices

    NARCIS (Netherlands)

    Tao, Q.

    2009-01-01

    In this thesis, we presented a detailed study of the face verification problem on the mobile device, covering every component of the system. The study includes face detection, registration, normalization, and verification. Furthermore, the information fusion problem is studied to verify face

  9. Alpha radioactivity measurement technology with ionized air type measurement. Applicability evaluation to verification of the clearance level

    International Nuclear Information System (INIS)

    Mita, Yutaka; Matsumura, Toshihiro; Yokoyama, Kaoru; Sugitsue, Noritake

    2008-10-01

    The purpose of this test is to evaluate the applicability of the clearance level measuring system by Ionized Air Type Measurement after decontaminated by sulfuric acid sample. In Ningyo-toge Environmental Engineering Center. The equipment and radioactive waste which were contaminated with uranium are generated so much in future dismantling stage. In our plan, some of equipments and radioactive waste are contaminated to a clearance level, and cut down on decommission and disposal expense. This plan needs the alpha-rays measurement technology of the very low level. We think that ionized Air transfer measurement technology is promising as of clearance verification technology. The ionized Air transfer measurement technology applied to the Ionized Air Type Measurement can measure plan radioactivity of a very low level. Moreover, as compared with a direct survey, there is the merit which can be measured in a short time. However ionized Air transfer measurement technology is new technology. Therefore, there is almost no measurement track record. Furthermore, the date about the influence of a background, a detection limit, measurement performance, and reliability is insufficient. So, this measurement test estimated applicability as clearance level verification of an Ionized Air Type Measurement. (author)

  10. 75 FR 38765 - Domestic Origin Verification System Questionnaire and Regulations Governing Inspection and...

    Science.gov (United States)

    2010-07-06

    ..., facility assessment services, certifications of quantity and quality, import product inspections, and... control number. These include export certification, inspection of section 8e import products, and...] Domestic Origin Verification System Questionnaire and Regulations Governing Inspection and Certification of...

  11. Software Verification and Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    International Nuclear Information System (INIS)

    YEH, T.

    2002-01-01

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent

  12. Potential future waste-to-energy systems

    OpenAIRE

    Thorin, Eva; Guziana, Bozena; Song, Han; Jääskeläinen, Ari; Szpadt, Ryszard; Vasilic, Dejan; Ahrens, Thorsten; Anne, Olga; Lõõnik, Jaan

    2012-01-01

    This report discusses potential future systems for waste-to-energy production in the Baltic Sea Region, and especially for the project REMOWE partner regions, the County of Västmanland in Sweden, Northern Savo in Finland, Lower Silesia in Poland, western part of Lithuania and Estonia. The waste-to-energy systems planned for in the partner regions are combustion of municipal solid waste (MSW) and solid recovered fuels from household and industry as well as anaerobic digestion of sewage sludge ...

  13. Remaining Sites Verification Package for the 100-F-36, 108-F Biological Laboratory, and for the 116-F-15, 108-F Radiation Crib. Attachment to Waste Site Reclassification Form 2007-002 and 2007-003

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2007-01-01

    The 116-F-15 waste site is the former location of the 108-F Radiation Crib that was located in the first floor of the 108-F Biological Laboratory. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  14. Tank waste remediation system retrieval and disposal mission waste feed delivery plan

    International Nuclear Information System (INIS)

    Potter, R.D.

    1998-01-01

    This document is a plan presenting the objectives, organization, and management and technical approaches for the Waste Feed Delivery (WFD) Program. This WFD Plan focuses on the Tank Waste Remediation System (TWRS) Project's Waste Retrieval and Disposal Mission

  15. Verification of Open Interactive Markov Chains

    OpenAIRE

    Brazdil, Tomas; Hermanns, Holger; Krcal, Jan; Kretinsky, Jan; Rehak, Vojtech

    2012-01-01

    Interactive Markov chains (IMC) are compositional behavioral models extending both labeled transition systems and continuous-time Markov chains. IMC pair modeling convenience - owed to compositionality properties - with effective verification algorithms and tools - owed to Markov properties. Thus far however, IMC verification did not consider compositionality properties, but considered closed systems. This paper discusses the evaluation of IMC in an open and thus compositional interpretation....

  16. Experimental study on design verification of new concept for integral reactor safety system

    International Nuclear Information System (INIS)

    Chung, Moon Ki; Choi, Ki Yong; Park, Hyun Sik; Cho, Seok; Park, Choon Kyung; Lee, Sung Jae; Song, Chul Hwa

    2004-01-01

    The pressurized light water cooled, medium power (330 MWt) SMART (System-integrated Modular Advanced ReacTor) has been under development at KAERI for a dual purpose : seawater desalination and electricity generation. The SMART design verification phase was followed to conduct various separate effects tests and comprehensive integral effect tests. The high temperature / high pressure thermal-hydraulic test facility, VISTA(Experimental Verification by Integral Simulation of Transient and Accidents) has been constructed to simulate the SMART-P (the one fifth scaled pilot plant) by KAERI. Experimental tests have been performed to investigate the thermal-hydraulic dynamic characteristics of the primary and the secondary systems. Heat transfer characteristics and natural circulation performance of the PRHRS (Passive Residual Heat Removal System) of SMART-P were also investigated using the VISTA facility. The coolant flows steadily in the natural circulation loop which is composed of the Steam Generator (SG) primary side, the secondary system, and the PRHRS. The heat transfers through the PRHRS heat exchanger and ECT are sufficient enough to enable the natural circulation of the coolant

  17. Establishment of database system for management of KAERI wastes

    International Nuclear Information System (INIS)

    Shon, J. S.; Kim, K. J.; Ahn, S. J.

    2004-07-01

    Radioactive wastes generated by KAERI has various types, nuclides and characteristics. To manage and control these kinds of radioactive wastes, it comes to need systematic management of their records, efficient research and quick statistics. Getting information about radioactive waste generated and stored by KAERI is the basic factor to construct the rapid information system for national cooperation management of radioactive waste. In this study, Radioactive Waste Management Integration System (RAWMIS) was developed. It is is aimed at management of record of radioactive wastes, uplifting the efficiency of management and support WACID(Waste Comprehensive Integration Database System) which is a national radioactive waste integrated safety management system of Korea. The major information of RAWMIS supported by user's requirements is generation, gathering, transfer, treatment, and storage information for solid waste, liquid waste, gas waste and waste related to spent fuel. RAWMIS is composed of database, software (interface between user and database), and software for a manager and it was designed with Client/Server structure. RAWMIS will be a useful tool to analyze radioactive waste management and radiation safety management. Also, this system is developed to share information with associated companies. Moreover, it can be expected to support the technology of research and development for radioactive waste treatment

  18. Waste certification review program at the Savannah River Site

    International Nuclear Information System (INIS)

    Faulk, G.W.; Kinney, J.C.; Knapp, D.C.; Burdette, T.E.

    1996-01-01

    After approving the waste certification programs for 45 generators of low-level radioactive and mixed waste, Westinghouse Savannah River Company (WSRC) moved forward to implement a performance-based approach for assuring that approved waste generators maintain their waste certification programs. WSRC implemented the Waste Certification Review Program, which is comprised of two sitewide programs, waste generator self-assessments and Facility Evaluation Board reviews, integrated with the WSRC Solid Waste Management Department Waste Verification Program Evaluations. The waste generator self-assessments ensure compliance with waste certification requirements, and Facility Evaluation Board reviews provide independent oversight of generators' waste certification programs. Waste verification evaluations by the TSD facilities serve as the foundation of the program by confirming that waste contents and generator performance continue to meet waste acceptance criteria (WSRC 1994) prior to shipment to treatment, storage, and disposal facilities. Construction of the Savannah River Site (SRS) was started by the US Government in 1950. The site covers approximately 300 square miles located along the Savannah River near Aiken, South Carolina. It is operated by the US Department of Energy (DOE). Operations are conducted by managing and operating contractors, including the Westinghouse Savannah River Company (WSRC). Historically, the primary purpose of the SRS was to produce special nuclear materials, primarily plutonium and tritium. In general, low-level radioactive and mixed waste is generated through activities in operations. Presently, 47 SRS facilities generate low-level radioactive and mixed waste. The policies, guidelines, and requirements for managing these wastes are determined by DOE and are reflected in DOE Order 5820.2A (US DOE 1988)

  19. Hanford 200 area (sanitary) waste water system

    International Nuclear Information System (INIS)

    Danch, D.A.; Gay, A.E.

    1994-09-01

    The US Department of Energy (DOE) Hanford Site is located in southeastern Washington State. The Hanford Site is approximately 1,450 sq. km (560 sq. mi) of semiarid land set aside for activities of the DOE. The reactor fuel processing and waste management facilities are located in the 200 Areas. Over the last 50 years at Hanford dicard of hazardous and sanitary waste water has resulted in billions of liters of waste water discharged to the ground. As part of the TPA, discharges of hazardous waste water to the ground and waters of Washington State are to be eliminated in 1995. Currently sanitary waste water from the 200 Area Plateau is handled with on-site septic tank and subsurface disposal systems, many of which were constructed in the 1940s and most do not meet current standards. Features unique to the proposed new sanitary waste water handling systems include: (1) cost effective operation of the treatment system as evaporative lagoons with state-of-the-art liner systems, and (2) routing collection lines to avoid historic contamination zones. The paper focuses on the challenges met in planning and designing the collection system

  20. Probabilistic safety assessment in radioactive waste disposal

    International Nuclear Information System (INIS)

    Robinson, P.C.

    1987-07-01

    Probabilistic safety assessment codes are now widely used in radioactive waste disposal assessments. This report gives an overview of the current state of the field. The relationship between the codes and the regulations covering radioactive waste disposal is discussed and the characteristics of current codes is described. The problems of verification and validation are considered. (author)

  1. Boiling water reactor liquid radioactive waste processing system

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The standard sets forth minimum design, construction and performance requirements with due consideration for operation of the liquid radioactive waste processing system for boiling water reactor plants for routine operation including design basis fuel leakage and design basis occurrences. For the purpose of this standard, the liquid radioactive waste processing system begins at the interfaces with the reactor coolant pressure boundary, at the interface valve(s) in lines from other systems and at those sumps and floor drains provided for liquid waste with the potential of containing radioactive material. The system terminates at the point of controlled discharge to the environment, at the point of interface with the waste solidification system and at the point of recycle back to storage for reuse. The standard does not include the reactor coolant clean-up system, fuel pool clean-up system, sanitary waste system, any nonaqueous liquid system or controlled area storm drains

  2. Radioisotope waste processing systems

    International Nuclear Information System (INIS)

    Machida, Tadashi

    1978-01-01

    The Atomic Energy Safety Bureau established the policy entitled ''On Common Processing System of Radioactive Wastes'' consulting with the Liaison Committee of Radioactive Waste Processing. Japan Atomic Energy Research Institute (JAERI) and Japan Radioisotope Association (JRIA) had been discussing the problems required for the establishment of the common disposal facilities based on the above policy, and they started the organization in spring, 1978. It is a foundation borrowing equipments from JAERI though installing newly some of them not available from JAERI, and depending the fund on JRIA. The operation expenses will be borne by those who want to dispose the wastes produced. The staffs are sent out from JAERI and JRIA. For animal wastes contaminated with RI, formaldehyde dipping should be abolished, but drying and freezing procedures will be taken before they are burnt up in a newly planned exclusive furnace with disposing capacity of 50 kg/hour. To settle the problems of other wastes, enough understanding and cooperation of users are to be requested. (Kobatake, H.)

  3. Startup of the remote laboratory-scale waste-treatment facility

    International Nuclear Information System (INIS)

    Knox, C.A.; Siemens, D.H.; Berger, D.N.

    1981-01-01

    The Remote Laboratory-Scale Waste-Treatment Facility was designed as a system to solidify small volumes of radioactive liquid wastes. The objectives in operating this facility are to evaluate solidification processes, determine the effluents generated, test methods for decontaminating the effluents, and provide radioactive solidified waste products for evaluation. The facility consists of a feed-preparation module, a waste-solidification module and an effluent-treatment module. The system was designed for remote installation and operation. Several special features for remotely handling radioactive materials were incorporated into the design. The equipment was initially assembled outside of a radiochemical cell to size and fabricate the connecting jumpers between the modules and to complete some preliminary design-verification tests. The equipment was then disassembled and installed in the radiochemical cell. When installation was completed the entire system was checked out with water and then with a nonradioactive simulated waste solution. The purpose of these operations was to start up the facility, find and solve operational problems, verify operating procedures and train personnel. The major problems experienced during these nonradioactive runs were plugging of the spray calciner nozzle and feed tank pumping failures. When these problems were solved, radioactive operations were started. This report describes the installation of this facility, its special remote design feature and the startup operations

  4. Bar-code automated waste tracking system

    International Nuclear Information System (INIS)

    Hull, T.E.

    1994-10-01

    The Bar-Code Automated Waste Tracking System was designed to be a site-Specific program with a general purpose application for transportability to other facilities. The system is user-friendly, totally automated, and incorporates the use of a drive-up window that is close to the areas dealing in container preparation, delivery, pickup, and disposal. The system features ''stop-and-go'' operation rather than a long, tedious, error-prone manual entry. The system is designed for automation but allows operators to concentrate on proper handling of waste while maintaining manual entry of data as a backup. A large wall plaque filled with bar-code labels is used to input specific details about any movement of waste

  5. Thermal processing systems for TRU mixed waste

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Anderson, G.L.

    1992-01-01

    This paper presents preliminary ex situ thermal processing system concepts and related processing considerations for remediation of transuranic (TRU)-contaminated wastes (TRUW) buried at the Radioactive Waste Management Complex (RWMC) of the Idaho National Engineering Laboratory (INEL). Anticipated waste stream components and problems are considered. Thermal processing conditions required to obtain a high-integrity, low-leachability glass/ceramic final waste form are considered. Five practical thermal process system designs are compared. Thermal processing of mixed waste and soils with essentially no presorting and using incineration followed by high temperature melting is recommended. Applied research and development necessary for demonstration is also recommended

  6. 75 FR 58346 - Hazardous Waste Management System; Identification and Listing of Hazardous Waste

    Science.gov (United States)

    2010-09-24

    ... Waste Management System; Identification and Listing of Hazardous Waste AGENCY: Environmental Protection... Chemical Company-Texas Operations (Eastman) to exclude (or delist) certain solid wastes generated by its Longview, Texas, facility from the lists of hazardous wastes. EPA used the Delisting Risk Assessment...

  7. Science, society, and America's nuclear waste: Unit 4, The waste management system

    International Nuclear Information System (INIS)

    1992-01-01

    This is unit 4 (The Waste Management System) in a four-unit secondary curriculum. It is intended to provide information about scientific and societal issues related to the management of spent nuclear fuel from generation of electricity at nuclear powerplants and high-level radioactive waste from US national defense activities. The curriculum, supporting classroom activities, and teaching materials present a brief discussion of energy and electricity generation, including that produced at nuclear powerplants; information on sources, amounts, location, and characteristics of spent nuclear fuel and high-level radioactive waste; sources, types and effects of radiation; US policy for managing and disposing of spent nuclear fuel and high-level radioactive waste and what other countries are doing; and the components of the nuclear waste management system

  8. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  9. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  10. Verification of Gamma Knife extend system based fractionated treatment planning using EBT2 film

    Energy Technology Data Exchange (ETDEWEB)

    Natanasabapathi, Gopishankar; Bisht, Raj Kishor [Gamma Knife Unit, Department of Neurosurgery, Neurosciences Centre, All India Institute of Medical Sciences, Ansari Nagar, New Delhi 110029 (India)

    2013-12-15

    Purpose: This paper presents EBT2 film verification of fractionated treatment planning with the Gamma Knife (GK) extend system, a relocatable frame system for multiple-fraction or serial multiple-session radiosurgery.Methods: A human head shaped phantom simulated the verification process for fractionated Gamma Knife treatment. Phantom preparation for Extend Frame based treatment planning involved creating a dental impression, fitting the phantom to the frame system, and acquiring a stereotactic computed tomography (CT) scan. A CT scan (Siemens, Emotion 6) of the phantom was obtained with following parameters: Tube voltage—110 kV, tube current—280 mA, pixel size—0.5 × 0.5 and 1 mm slice thickness. A treatment plan with two 8 mm collimator shots and three sectors blocking in each shot was made. Dose prescription of 4 Gy at 100% was delivered for the first fraction out of the two fractions planned. Gafchromic EBT2 film (ISP Wayne, NJ) was used as 2D verification dosimeter in this process. Films were cut and placed inside the film insert of the phantom for treatment dose delivery. Meanwhile a set of films from the same batch were exposed from 0 to 12 Gy doses for calibration purposes. An EPSON (Expression 10000 XL) scanner was used for scanning the exposed films in transparency mode. Scanned films were analyzed with inhouse written MATLAB codes.Results: Gamma index analysis of film measurement in comparison with TPS calculated dose resulted in high pass rates >90% for tolerance criteria of 1%/1 mm. The isodose overlay and linear dose profiles of film measured and computed dose distribution on sagittal and coronal plane were in close agreement.Conclusions: Through this study, the authors propose treatment verification QA method for Extend frame based fractionated Gamma Knife radiosurgery using EBT2 film.

  11. Verification of Gamma Knife extend system based fractionated treatment planning using EBT2 film

    International Nuclear Information System (INIS)

    Natanasabapathi, Gopishankar; Bisht, Raj Kishor

    2013-01-01

    Purpose: This paper presents EBT2 film verification of fractionated treatment planning with the Gamma Knife (GK) extend system, a relocatable frame system for multiple-fraction or serial multiple-session radiosurgery.Methods: A human head shaped phantom simulated the verification process for fractionated Gamma Knife treatment. Phantom preparation for Extend Frame based treatment planning involved creating a dental impression, fitting the phantom to the frame system, and acquiring a stereotactic computed tomography (CT) scan. A CT scan (Siemens, Emotion 6) of the phantom was obtained with following parameters: Tube voltage—110 kV, tube current—280 mA, pixel size—0.5 × 0.5 and 1 mm slice thickness. A treatment plan with two 8 mm collimator shots and three sectors blocking in each shot was made. Dose prescription of 4 Gy at 100% was delivered for the first fraction out of the two fractions planned. Gafchromic EBT2 film (ISP Wayne, NJ) was used as 2D verification dosimeter in this process. Films were cut and placed inside the film insert of the phantom for treatment dose delivery. Meanwhile a set of films from the same batch were exposed from 0 to 12 Gy doses for calibration purposes. An EPSON (Expression 10000 XL) scanner was used for scanning the exposed films in transparency mode. Scanned films were analyzed with inhouse written MATLAB codes.Results: Gamma index analysis of film measurement in comparison with TPS calculated dose resulted in high pass rates >90% for tolerance criteria of 1%/1 mm. The isodose overlay and linear dose profiles of film measured and computed dose distribution on sagittal and coronal plane were in close agreement.Conclusions: Through this study, the authors propose treatment verification QA method for Extend frame based fractionated Gamma Knife radiosurgery using EBT2 film

  12. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  13. Standard practice for verification of constant amplitude dynamic forces in an axial fatigue testing system

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2008-01-01

    1.1 This practice covers procedures for the dynamic verification of cyclic force amplitude control or measurement accuracy during constant amplitude testing in an axial fatigue testing system. It is based on the premise that force verification can be done with the use of a strain gaged elastic element. Use of this practice gives assurance that the accuracies of forces applied by the machine or dynamic force readings from the test machine, at the time of the test, after any user applied correction factors, fall within the limits recommended in Section 9. It does not address static accuracy which must first be addressed using Practices E 4 or equivalent. 1.2 Verification is specific to a particular test machine configuration and specimen. This standard is recommended to be used for each configuration of testing machine and specimen. Where dynamic correction factors are to be applied to test machine force readings in order to meet the accuracy recommended in Section 9, the verification is also specific to the c...

  14. Challenges for effective WMD verification

    International Nuclear Information System (INIS)

    Andemicael, B.

    2006-01-01

    Effective verification is crucial to the fulfillment of the objectives of any disarmament treaty, not least as regards the proliferation of weapons of mass destruction (WMD). The effectiveness of the verification package depends on a number of factors, some inherent in the agreed structure and others related to the type of responses demanded by emerging challenges. The verification systems of three global agencies-the IAEA, the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO, currently the Preparatory Commission), and the Organization for the Prohibition of Chemical Weapons (OPCW)-share similarities in their broad objectives of confidence-building and deterrence by assuring members that rigorous verification would deter or otherwise detect non-compliance. Yet they are up against various constraints and other issues, both internal and external to the treaty regime. These constraints pose major challenges to the effectiveness and reliability of the verification operations. In the nuclear field, the IAEA safeguards process was the first to evolve incrementally from modest Statute beginnings to a robust verification system under the global Treaty on the Non-Proliferation of Nuclear Weapons (NPT). The nuclear non-proliferation regime is now being supplemented by a technology-intensive verification system of the nuclear test-ban treaty (CTBT), a product of over three decades of negotiation. However, there still remain fundamental gaps and loopholes in the regime as a whole, which tend to diminish the combined effectiveness of the IAEA and the CTBT verification capabilities. He three major problems are (a) the lack of universality of membership, essentially because of the absence of three nuclear weapon-capable States-India, Pakistan and Israel-from both the NPT and the CTBT, (b) the changes in US disarmament policy, especially in the nuclear field, and (c) the failure of the Conference on Disarmament to conclude a fissile material cut-off treaty. The world is

  15. Incineration systems for low level and mixed wastes

    International Nuclear Information System (INIS)

    Vavruska, J.

    1986-01-01

    A variety of technologies has emerged for incineration of combustible radioactive, hazardous, and mixed wastes. Evaluation and selection of an incineration system for a particular application from such a large field of options are often confusing. This paper presents several current incineration technologies applicable to Low Level Waste (LLW), hazardous waste, and mixed waste combustion treatment. The major technologies reviewed include controlled-air, rotary kiln, fluidized bed, and liquid injection. Coupled with any incineration technique is the need to select a compatible offgas effluent cleaning system. This paper also reviews the various methods of treating offgas emissions for acid vapor, particulates, organics, and radioactivity. Such effluent control systems include the two general types - wet and dry scrubbing with a closer look at quenching, inertial systems, fabric filtration, gas absorption, adsorption, and various other filtration techniques. Selection criteria for overall waste incineration systems are discussed as they relate to waste characterization

  16. Legal system of nuclear waste disposal. Das System der atomaren Entsorgungsregelung

    Energy Technology Data Exchange (ETDEWEB)

    Dauk, W

    1983-01-01

    This doctoral thesis presents solutions to some of the legal problems encountered in the interpretation of the various laws and regulations governing nuclear waste disposal, and reveals the legal system supporting the variety of individual regulations. Proposals are made relating to modifications of problematic or not well defined provisions, in order to contribute to improved juridical security, or inambiguity in terms of law. The author also discusses the question of the constitutionality of the laws for nuclear waste disposal. Apart from the responsibility of private enterprise to contribute to safe treatment or recycling, within the framework of the integrated waste management concept, and apart from the Government's responsibility for interim or final storage of radioactive waste, there is a third possibility included in the legal system for waste management, namely voluntary measures taken by private enterprise for radioactive waste disposal. The licence to be applied for in accordance with section 3, sub-section (1) of the Radiation Protection Ordinance is interpreted to pertain to all measures of radioactive waste disposal, thus including final storage of radioactive waste by private companies. Although the terminology and systematic concept of nuclear waste disposal are difficult to understand, there is a functionable system of legal provisions contained therein. This system fits into the overall concept of laws governing technical safety and safety engineering.

  17. Corrosion control for the Hanford site waste transfer system

    International Nuclear Information System (INIS)

    Haberman, J.H.

    1995-01-01

    Processing large volumes of spent reactor fuel and other related waste management activities produced radioactive wastes which have been stored in underground high-level waste storage tanks since the 1940s. The effluent waste streams from the processing facilities were stored underground in high-level waste storage tanks. The waste was transferred between storage tanks and from the tanks to waste processing facilities in a complex network of underground piping. The underground waste transfer system consists of process piping, catch tanks, lift tanks, diversion boxes, pump pits, valves, and jumpers. Corrosion of the process piping from contact with the soil is a primary concern. The other transfer system components are made of corrosion-resistant alloys or they are isolated from the underground environment and experience little degradation. Corrosion control of the underground transfer system is necessary to ensure that transfer routes will be available for future waste retrieval, processing,a nd disposal. Today, most waste transfer lines are protected by an active impressed-current cathodic protection (CP) system. The original system has been updated. Energization surveys and a recent base-line survey demonstrate that system operational goals are met

  18. Verification report for SIMREP 1.1

    International Nuclear Information System (INIS)

    Tarapore, P.S.

    1987-06-01

    SIMREP 1.1 is a discrete event computer simulation of repository operations in the surface waste-handling facility. The logic for this model is provided by Fluor Technology, Inc., the Architect/Engineer of the salt repository. The verification methods included a line-by-line review of the code, a detailed examination of a generated trace of all simulated events over a given period of operations, and a comparison of the simulation output results with expected values. SIMREP 1.1 performs in the required manner under the given range of input conditions

  19. Low and intermediate waste management in Spain

    International Nuclear Information System (INIS)

    Zuloaga, Pablo

    2002-01-01

    The main objective of this facility is the final disposal of all L and ILW produced in Spain, mainly in the operating Nuclear Power Reactors, in the Nuclear Power Plant under decommissioning by ENRESA, a fuel fabrication plant and institutional producers, as well as those arising from incidents outside the nuclear industry. The disposal concept consists of so called disposal units, mainly durable concrete overpacks, placed in concrete vaults. A drain control system exists in inspection galleries constructed beneath the disposal vaults. These vaults are protected from the weather during their operation and sealing by a metallic shelter, which also supports the handling crane. The facility also include: A treatment and conditioning shop, which includes incineration, institutional wastes segregation and conditioning, drum transfer into overpacks, supercompaction, liquid waste collection, and grout preparation and injection. A waste form characterisation laboratory with means for non-destructive radiological characterisation and for destructive test on the waste forms(specimens extractions, unskinning of the drums, mechanical strength, leaching test on specimens and full size packages) to supports the waste acceptance procedures and the verification of the overall quality of the packages. A fabrication shop for overpacks construction. Auxiliary systems and buildings in support of operation, maintenance and surveillance of the facility. The paper deals with the design, the operating experience of the facility, the waste packages characterisation and acceptance practises and the reception of the wastes from the generating facilities. (author)

  20. 75 FR 11002 - Hazardous Waste Management System; Identification and Listing of Hazardous Waste; Final Rule

    Science.gov (United States)

    2010-03-10

    ... Waste Management System; Identification and Listing of Hazardous Waste; Final Rule AGENCY: Environmental... and specific types of management of the petitioned waste, the quantities of waste generated, and waste... wastes. This final rule responds to a petition submitted by Valero to delist F037 waste. The F037 waste...

  1. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  2. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  3. Quality assurance and verification of the MACCS [MELCOR Accident Consequence Code System] code, Version 1.5

    International Nuclear Information System (INIS)

    Dobbe, C.A.; Carlson, E.R.; Marshall, N.H.; Marwil, E.S.; Tolli, J.E.

    1990-02-01

    An independent quality assurance (QA) and verification of Version 1.5 of the MELCOR Accident Consequence Code System (MACCS) was performed. The QA and verification involved examination of the code and associated documentation for consistent and correct implementation of the models in an error-free FORTRAN computer code. The QA and verification was not intended to determine either the adequacy or appropriateness of the models that are used MACCS 1.5. The reviews uncovered errors which were fixed by the SNL MACCS code development staff prior to the release of MACCS 1.5. Some difficulties related to documentation improvement and code restructuring are also presented. The QA and verification process concluded that Version 1.5 of the MACCS code, within the scope and limitations process concluded that Version 1.5 of the MACCS code, within the scope and limitations of the models implemented in the code is essentially error free and ready for widespread use. 15 refs., 11 tabs

  4. Groebner Bases Based Verification Solution for SystemVerilog Concurrent Assertions

    Directory of Open Access Journals (Sweden)

    Ning Zhou

    2014-01-01

    of polynomial ring algebra to perform SystemVerilog assertion verification over digital circuit systems. This method is based on Groebner bases theory and sequential properties checking. We define a constrained subset of SVAs so that an efficient polynomial modeling mechanism for both circuit descriptions and assertions can be applied. We present an algorithm framework based on the algebraic representations using Groebner bases for concurrent SVAs checking. Case studies show that computer algebra can provide canonical symbolic representations for both assertions and circuit designs and can act as a novel solver engine from the viewpoint of symbolic computation.

  5. Development of a comprehensive radioactive waste classification system

    International Nuclear Information System (INIS)

    Smith, C.F.; Cohen, J.J.

    1989-01-01

    Several previous studies have been conducted with the intent of developing a rational system for classification of radioactive wastes. Although none of the proposed systems has gained general acceptance, certain waste classes, specifically high-level waste and low-level waste suitable for shallow land burial have been essentially defined by regulation. Wastes which remain undefined include: those intermediate level wastes which require more restrictive controls than that provided by shallow land burial but not the high degree of isolation needed for high level wastes, and wastes below regulatory concern (BRC) which entail so low a radiological risk that they can be managed according to their nonradiological properties. This study has developed a framework within which the complete spectrum of radioactive wastes can be defined

  6. Complex Systems Models and Their Applications: Towards a New Science of Verification, Validation & Uncertainty Quantification

    Energy Technology Data Exchange (ETDEWEB)

    Tsao, Jeffrey Y. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Trucano, Timothy G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Kleban, Stephen D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Naugle, Asmeret Bier [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Verzi, Stephen Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swiler, Laura Painton [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Johnson, Curtis M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Smith, Mark A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Flanagan, Tatiana Paz [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Vugrin, Eric D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gabert, Kasimir Georg [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lave, Matthew Samuel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Chen, Wei [Northwestern Univ., Evanston, IL (United States); DeLaurentis, Daniel [Purdue Univ., West Lafayette, IN (United States); Hubler, Alfred [Univ. of Illinois, Urbana, IL (United States); Oberkampf, Bill [WLO Consulting, Austin, TX (United States)

    2016-08-01

    This report contains the written footprint of a Sandia-hosted workshop held in Albuquerque, New Mexico, June 22-23, 2016 on “Complex Systems Models and Their Applications: Towards a New Science of Verification, Validation and Uncertainty Quantification,” as well as of pre-work that fed into the workshop. The workshop’s intent was to explore and begin articulating research opportunities at the intersection between two important Sandia communities: the complex systems (CS) modeling community, and the verification, validation and uncertainty quantification (VVUQ) community The overarching research opportunity (and challenge) that we ultimately hope to address is: how can we quantify the credibility of knowledge gained from complex systems models, knowledge that is often incomplete and interim, but will nonetheless be used, sometimes in real-time, by decision makers?

  7. Science, society, and America's nuclear waste: Unit 4, The waste management system

    International Nuclear Information System (INIS)

    1992-01-01

    This is the teachers guide to unit 4, (The Waste Management System), of a four-unit secondary curriculum. It is intended to provide information about scientific and societal issues related to the management of spent nuclear fuel from generation of electricity at nuclear powerplants and high-level radioactive waste from US national defense activities. The curriculum, supporting classroom activities, and teaching materials present a brief discussion of energy and electricity generation, including that produced at nuclear powerplants; information on sources, amounts, location, and characteristics of spent nuclear fuel and high-level radioactive waste; sources, types and effects of radiation; US policy for managing and disposing of spent nuclear fuel and high-level radioactive waste and what other countries are doing; and the components of the nuclear waste management system

  8. Formal Verification of Digital Protection Logic and Automatic Testing Software

    Energy Technology Data Exchange (ETDEWEB)

    Cha, S. D.; Ha, J. S.; Seo, J. S. [KAIST, Daejeon (Korea, Republic of)

    2008-06-15

    - Technical aspect {center_dot} It is intended that digital I and C software have safety and reliability. Project results help the software to acquire license. Software verification technique, which results in this project, can be to use for digital NPP(Nuclear power plant) in the future. {center_dot} This research introduces many meaningful results of verification on digital protection logic and suggests I and C software testing strategy. These results apply to verify nuclear fusion device, accelerator, nuclear waste management and nuclear medical device that require dependable software and high-reliable controller. Moreover, These can be used for military, medical or aerospace-related software. - Economical and industrial aspect {center_dot} Since safety of digital I and C software is highly import, It is essential for the software to be verified. But verification and licence acquisition related to digital I and C software face high cost. This project gives economic profit to domestic economy by using introduced verification and testing technique instead of foreign technique. {center_dot} The operation rate of NPP will rise, when NPP safety critical software is verified with intellectual V and V tool. It is expected that these software substitute safety-critical software that wholly depend on foreign. Consequently, the result of this project has high commercial value and the recognition of the software development works will be able to be spread to the industrial circles. - Social and cultural aspect People expect that nuclear power generation contributes to relieving environmental problems because that does not emit more harmful air pollution source than other power generations. To give more trust and expectation about nuclear power generation to our society, we should make people to believe that NPP is highly safe system. In that point of view, we can present high-reliable I and C proofed by intellectual V and V technique as evidence

  9. Liquid low level waste management expert system

    International Nuclear Information System (INIS)

    Ferrada, J.J.; Abraham, T.J.; Jackson, J.R.

    1991-01-01

    An expert system has been developed as part of a new initiative for the Oak Ridge National Laboratory (ORNL) systems analysis program. This expert system will aid in prioritizing radioactive waste streams for treatment and disposal by evaluating the severity and treatability of the problem, as well as the final waste form. The objectives of the expert system development included: (1) collecting information on process treatment technologies for liquid low-level waste (LLLW) that can be incorporated in the knowledge base of the expert system, and (2) producing a prototype that suggests processes and disposal technologies for the ORNL LLLW system. 4 refs., 9 figs

  10. PWR Users Group 10 CFR 61 Waste Form Requirements Compliance Test Program

    International Nuclear Information System (INIS)

    Rosenlof, R.C.

    1985-01-01

    In January of 1984, a PWR Users Group was formed to initiate a 10 CFR 61 Waste Form Requirements Compliance Test Program on a shared cost basis. The original Radwaste Solidification Systems sold by ATCOR ENGINEERED SYSTEMS, INC. to the utilities were required to produce a free-standing monolith with no free water. None of the other requirements of 10 CFR 61 had to be met. Current regulations, however, have substantially expanded the scope of the waste form acceptance criteria. These new criteria required that generators of radioactive waste demonstrate the ability to produce waste forms which meet certain chemical and physical requirements. This paper will present the test program used and the results obtained to insure 10 CFR 61 compliance of the three (3) typical waste streams generated by the ATCOR PWR Users Group's plants. The primary objective of the PWR Users Group was not to maximize waste loading within the masonry cement solidification media, but to insure that the users Radwaste Solidification System is capable of producing waste forms which meet the waste form criteria of 10 CFR 61. A description of the laboratory small sample certification program and the actual full scale pilot plant verification approach used is included in this paper. Also included is a discussion of the development of a Process Control Program to ensure the reproducibility of the test results with actual waste

  11. 75 FR 57686 - Hazardous Waste Management System; Identification and Listing of Hazardous Waste Amendment

    Science.gov (United States)

    2010-09-22

    ... Waste Management System; Identification and Listing of Hazardous Waste Amendment AGENCY: Environmental...) 260.20 and 260.22 allows facilities to demonstrate that a specific waste from a particular generating facility should not be regulated as a hazardous waste. Based on waste-specific information provided by the...

  12. Design and verification of computer-based reactor control system modification at Bruce-A candu nuclear generating station

    International Nuclear Information System (INIS)

    Basu, S.; Webb, N.

    1995-01-01

    The Reactor Control System at Bruce-A Nuclear Generating Station is going through some design modifications, which involve a rigorous design process including independent verification and validation. The design modification includes changes to the control logic, alarms and annunciation, hardware and software. The design (and verification) process includes design plan, design requirements, hardware and software specifications, hardware and software design, testing, technical review, safety evaluation, reliability analysis, failure mode and effect analysis, environmental qualification, seismic qualification, software quality assurance, system validation, documentation update, configuration management, and final acceptance. (7 figs.)

  13. Determination of a radioactive waste classification system

    Energy Technology Data Exchange (ETDEWEB)

    Cohen, J.J.; King, W.C.

    1978-03-01

    Several classification systems for radioactive wastes are reviewed and a system is developed that provides guidance on disposition of the waste. The system has three classes: high-level waste (HLW), which requires complete isolation from the biosphere for extended time periods; low-level waste (LLW), which requires containment for shorter periods; and innocuous waste (essentially nonradioactive), which may be disposed of by conventional means. The LLW/innocuous waste interface was not defined in this study. Reasonably conservative analytical scenarios were used to calculate that HLW/LLW interface level which would ensure compliance with the radiological exposure guidelines of 0.5 rem/y maximum exposure for a few isolated individuals and 0.005 rem/y for large population groups. The recommended HLW/LLW interface level for /sup 239/Pu or mixed transuranic waste is 1.0 ..mu..Ci/cm/sup 3/ of waste. Levels for other radionuclides are based upon a risk equivalent to this level. A cost-benefit analysis in accordance with as low as reasonably achievable (ALARA) and National Environmental Protection Act (NEPA) guidance indicates that further reduction of this HLW/LLL interface level would entail marginal costs greater than $10/sup 8/ per man-rem of dose avoided. The environmental effects considered were limited to those involving human exposure to radioactivity.

  14. Determination of a radioactive waste classification system

    International Nuclear Information System (INIS)

    Cohen, J.J.; King, W.C.

    1978-03-01

    Several classification systems for radioactive wastes are reviewed and a system is developed that provides guidance on disposition of the waste. The system has three classes: high-level waste (HLW), which requires complete isolation from the biosphere for extended time periods; low-level waste (LLW), which requires containment for shorter periods; and innocuous waste (essentially nonradioactive), which may be disposed of by conventional means. The LLW/innocuous waste interface was not defined in this study. Reasonably conservative analytical scenarios were used to calculate that HLW/LLW interface level which would ensure compliance with the radiological exposure guidelines of 0.5 rem/y maximum exposure for a few isolated individuals and 0.005 rem/y for large population groups. The recommended HLW/LLW interface level for 239 Pu or mixed transuranic waste is 1.0 μCi/cm 3 of waste. Levels for other radionuclides are based upon a risk equivalent to this level. A cost-benefit analysis in accordance with as low as reasonably achievable (ALARA) and National Environmental Protection Act (NEPA) guidance indicates that further reduction of this HLW/LLL interface level would entail marginal costs greater than $10 8 per man-rem of dose avoided. The environmental effects considered were limited to those involving human exposure to radioactivity

  15. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  16. The Integrated Waste Tracking Systems (IWTS) - A Comprehensive Waste Management Tool

    International Nuclear Information System (INIS)

    Robert S. Anderson

    2005-01-01

    The US Department of Energy (DOE) Idaho National Laboratory (INL) site located near Idaho Falls, ID USA, has developed a comprehensive waste management and tracking tool that integrates multiple operational activities with characterization data from waste declaration through final waste disposition. The Integrated Waste Tracking System (IWTS) provides information necessary to help facility personnel properly manage their waste and demonstrate a wide range of legal and regulatory compliance. As a client?server database system, the IWTS is a proven tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of flexibility. This paper describes some of the history involved with the development and current use of IWTS as a comprehensive waste management tool as well as a discussion of IWTS deployments performed by the INL for outside clients. Waste management spans a wide range of activities including: work group interactions, regulatory compliance management, reporting, procedure management, and similar activities. The IWTS documents these activities and performs tasks in a computer-automated environment. Waste characterization data, container characterization data, shipments, waste processing, disposals, reporting, and limit compliance checks are just a few of the items that IWTS documents and performs to help waste management personnel perform their jobs. Throughout most hazardous and radioactive waste generating, storage and disposal sites, waste management is performed by many different groups of people in many facilities. Several organizations administer their areas of waste management using their own procedures and documentation independent of other organizations. Files are kept, some of which are treated as quality records, others not as stringent. Quality records maintain a history of: changes performed after approval, the reason for the change(s), and a record of whom and when

  17. Verification on reliability of heat exchanger for primary cooling system

    International Nuclear Information System (INIS)

    Koike, Sumio; Gorai, Shigeru; Onoue, Ryuji; Ohtsuka, Kaoru

    2010-07-01

    Prior to the JMTR refurbishment, verification on reliability of the heat exchangers for primary cooling system was carried out to investigate an integrity of continuously use component. From a result of the significant corrosion, decrease of tube thickness, crack were not observed on the heat exchangers, and integrity of heat exchangers were confirmed. In the long terms usage of the heat exchangers, the maintenance based on periodical inspection and a long-term maintenance plan is scheduled. (author)

  18. Expert system for liquid low-level waste management

    International Nuclear Information System (INIS)

    Ferrada, J.J.

    1992-01-01

    An expert system prototype has been developed to support system analysis activities at the Oak Ridge National Laboratory (ORNL) for waste management tasks. This expert system will aid in prioritizing radioactive waste streams for treatment and disposal by evaluating the severity and treatability of the problem as well as the final waste form. The objectives of the expert system development included: (1) collecting information on process treatment technologies for liquid low-level waste (LLLW) that can be incorporated in the knowledge base of the expert system, and (2) producing a prototype that suggests processes and disposal technologies for the ORNL LLLW system. The concept under which the expert system has been designed is integration of knowledge. There are many sources of knowledge (data bases, text files, simulation programs, etc.) that an expert would regularly consult in order to solve a problem of liquid waste management. The expert would normally know how to extract the information from these different sources of knowledge. The general scope of this project would be to include as much pertinent information as possible within the boundaries of the expert system. As a result, the user, who may not be an expert in every aspect of liquid waste management, may be able to apply the content of the information to a specific waste problem. This paper gives the methodological steps to develop the expert system under this general framework

  19. 76 FR 16534 - Hazardous Waste Management System Identification and Listing of Hazardous Waste; Final Exclusion

    Science.gov (United States)

    2011-03-24

    ... Waste Management System Identification and Listing of Hazardous Waste; Final Exclusion AGENCY...) on a one-time basis from the lists of hazardous waste, a certain solid waste generated at its Mt... waste is [[Page 16535

  20. Alpha low-level stored waste systems design study

    Energy Technology Data Exchange (ETDEWEB)

    Feizollahi, F.; Teheranian, B. (Morrison Knudson Corp., San Francisco, CA (United States). Environmental Services Div.); Quapp, W.J. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-08-01

    The Stored Waste System Design Study (SWSDS), commissioned by the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examines relative life-cycle costs associated with three system concepts for processing the alpha low-level waste (alpha-LLW) stored at the Radioactive Waste Management Complex's Transuranic Storage Area at the INEL. The three system concepts are incineration/melting; thermal treatment/solidification; and sort, treat, and repackage. The SWSDS identifies system functional and operational requirements and assesses implementability; effectiveness; cost; and demonstration, testing, and evaluation (DT E) requirements for each of the three concepts.