WorldWideScience

Sample records for waive pre-approval inspection

  1. 43 CFR 429.26 - When may Reclamation reduce or waive costs or fees?

    Science.gov (United States)

    2010-10-01

    ... Reductions or Waivers of Application Fees, Administrative Costs, and Use Fees § 429.26 When may Reclamation reduce or waive costs or fees? (a) As determined appropriate and approved and documented by the applicable Regional Director, the application fees may be waived, and charges for administrative costs or use...

  2. 9 CFR 354.14 - Authority to waive provisions of § 354.12.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Authority to waive provisions of § 354.12. 354.14 Section 354.14 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... plants in specific instances where rabbits are to be brought into compliance with a law under the...

  3. Pre-service inspection and in-service inspection in Japan

    International Nuclear Information System (INIS)

    Uebayashi, T.; Miyake, Y.

    1985-01-01

    To ensure the safety of nuclear power plant, pre-service inspection/in-service inspection (PSI/ISI) has an important role, and informations obtained from various inspections during plant shut-down period are contributing to establish effective preventive maintenance activities for plant facilities. It might be said that the high level of availability of Japanese light-water nuclear power plants in these two or three years has been achieved by those efforts. In case of Japan, inspections to be carried out during scheduled plant shut-down period are not limited to code requirements but include many other inspections which are mostly reflected from troubles experienced in both domestic and overseas plants. Usually, those additional inspections are performed by Ministry of Trade and Industries' (MITI's) regulator and/or tentative requirement and considered as ISI in broad meaning. To achieve high availability of plant, it is essential to avoid unscheduled shut-down and to shorten inspection period. The developments of new technology to perform effective ISI for operating plants are continued, but on the other hand it is also very important to pay a great consideration to inspectability of the plants at the stage of plant engineering. With the leadership of MITI, improvement and standardization of light-water nuclear power plant has been proceeded and newly constructed plants have great advantage from the point of view on ISI

  4. 9 CFR 130.11 - User fees for inspecting and approving import/export facilities and establishments.

    Science.gov (United States)

    2010-01-01

    ... hourly user fee rate in § 130.30(2) applies to biosecurity level two laboratories. (b) [Reserved] [65 FR... approval) Per year $537.00 $553.00 $570.00 $587.00 $604.00 Inspection for approval of biosecurity level three labs (all inspections related to approving the laboratory for handling one defined set of...

  5. Optimizing pre-service inspection data

    International Nuclear Information System (INIS)

    Mullins, L.E.; Harrison, J.M.

    1986-01-01

    The phenomenon of intergranular stress corrosion cracking (IGSCC) in nuclear power plant piping systems has been the single biggest factor in an evolution that has changed and continues to change in-service inspection practices and philosophy throughout the industry. In-service inspection has been found to deal with several distinct phases of the problem. At the onset, existing technology was demonstrated to be unable to detect IGSCC adequately. This inability to detect IGSCC was soon overcome. However, it immediately pointed out the difficulties associated with the discrimination between IGSCC and other harmless metallurgical conditions. On the heels of detection and discrimination came problems associated with determining crack size and the monitoring of overlayed flaws. A wealth of information has been written on all phases of IGSCC; however, one particular aspect has as of yet seen little attention. With an increasing number of plants choosing to replace flawed pipe, the pre-service inspection of the replaced piping demands increased attention. The lessons learned through inspection for IGSCC need again to be applied to the replacement piping. Through increased attention at installation, many of the difficulties associated with proper inservice inspection may be reduced or eliminated, thereby realizing an economy in outage scheduling, personnel exposure, and, overall, a more reliable in-service examination

  6. 5 CFR 892.205 - May I waive participation in premium conversion after the initial implementation?

    Science.gov (United States)

    2010-01-01

    ... PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS PREMIUMS Eligibility and Participation § 892.205 May I waive...

  7. 46 CFR 159.005-11 - Approval inspection or test report: Contents.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Approval inspection or test report: Contents. 159.005-11 Section 159.005-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT... representation is also punishable as a crime under 18 U.S.C. 1001. ...

  8. Pre and post garter spring repositioning ultrasonic inspection of pressure tubes

    International Nuclear Information System (INIS)

    Desimone, C.; Katchadjian, P.; Tacchia, Mauricio

    1997-01-01

    This paper present a description of the ultrasonic cracked hydride blister detections system used for pre and post inspection of pressure tubes during garter spring repositioning in CNE (Embalse Nuclear Power Station). Ultrasonic system setup configuration, transducers characteristics, blister detection head, calibration of parameters, operating procedure, records of ultrasonic inspections and evaluation. (author) [es

  9. CLIA Currently Waived Analytes

    Data.gov (United States)

    U.S. Department of Health & Human Services — This database contains the commercially marketed in vitro test systems categorized as CLIA waived by the FDA since January 31, 2000, and by the Centers for Disease...

  10. Planning and programming of pre-operational and in-service inspections

    International Nuclear Information System (INIS)

    Udaondo, M.S.

    1984-01-01

    After a brief mention of the actual scope of in-service inspection work, conclusions are presented that relate to the preparations for inspections, making use of experience acquired since 1972 at 11 nuclear power plants in Spain which have commissioned such studies from one particular organization, and analyses are given of the advantages to be gained therefrom. Three different aspects of preparations for inspections are considered: (a) man-hour estimates and the duration of in-service inspections; (b) the sequence of action during a pre-operational inspection (assuming a typical functional organization) from definition of the codes of practice and standards applicable up to the issue of the final report and the schedule for distribution of the annual work load to be invested in a typical project, as a result of combining the two previous estimates, and (c) the documentary aspect of preparations for an inspection during a scheduled outage, as related to the various documents to be drawn up and their contents. Reference is made to the general training to be given to the staff in charge of inspection activities so as to provide them with information on, and a perspective of, the in-service inspection jobs required. (author)

  11. 20 CFR 10.15 - May compensation rights be waived?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false May compensation rights be waived? 10.15 Section 10.15 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL... AMENDED General Provisions Rights and Penalties § 10.15 May compensation rights be waived? No employer or...

  12. Pre-service baseline inspection using x-probe of Oconee replacement steam generators

    International Nuclear Information System (INIS)

    Addario, M.; Shipp, P.; Davis, K.; Fogal, C.

    2003-01-01

    The eddy current method has been the industry standard for inspecting steam generator tubing for many years and the level of sophistication of coil technology has continued to evolve during that time. State of the art array probe systems now employ multiple sensitivity zones in the probe to better detect and characterize defects in an efficient manner. Owners and regulators of nuclear power plants are interested in the most effective and efficient inspection possible. The ultimate goal has been to meet or exceed new and existing regulatory and design requirements by maximizing the quantity and quality of eddy current data collected while minimizing both the time needed to perform the inspection and the radiation exposure. The X-Probe is an example of this new eddy current array technology. Qualified to detect all types of known defects in steam generator tubing, the technology is comprised of a system of probe, data acquisition instrumentation, computer and human interface software. Recently, Duke Power, along with Babcock and Wilcox Canada and the system developer R/D Tech, collaborated to implement this technology in a first of a kind full scale pre-service inspection of replacement steam generators for Duke Power's Oconee nuclear generating station at Babcock and Wilcox Canada's Cambridge plant. The discussion in this paper will briefly describe the X-Probe technology, describe the system required to perform the inspection, present the general results of the inspection and finally draw some comparative benefit conclusions for both pre-service and in-service applications. (author)

  13. 43 CFR 2.19 - When will bureaus waive fees?

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false When will bureaus waive fees? 2.19 Section... OF INFORMATION ACT Requests for Records under the FOIA § 2.19 When will bureaus waive fees? (a) Fees... section and appendix D to this part. The burden is on you to justify entitlement to a fee waiver. Requests...

  14. 20 CFR 408.1230 - Can you waive State recognition payments?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Can you waive State recognition payments? 408.1230 Section 408.1230 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SPECIAL BENEFITS FOR CERTAIN WORLD WAR II VETERANS Federal Administration of State Recognition Payments § 408.1230 Can you waive...

  15. Overcoming Innocents' Naiveté: Pre-interrogation Decision-making Among Innocent Suspects.

    Science.gov (United States)

    Scherr, Kyle C; Alberts, Kimberly M; Franks, Andrew S; Hawkins, Ian

    2016-07-01

    Suspects, especially innocent ones, are highly susceptible to waiving their interrogation rights. This research tested the ability of two strategies to overcome innocent suspects' willingness to waive their rights. One strategy was based on the social influence of scarcity (i.e., not constraining the pre-interrogation time limit). The other strategy focused on disrupting individuals' cognitive fluency during the decision-making process (i.e., violating their induced expectation of offering a waiver). Disrupting innocent individuals' cognitive fluency increased their willingness to invoke their rights and, notably, was not qualified by interactions with any other factors. However, scarcity did not influence individuals' pre-interrogation decision-making. Results also further established the association between innocent individuals' naïve mindset and their willingness to waive their rights - specifically, innocents' willingness to waive their rights increased with the strength of their just world beliefs. The theoretical and applied implications of these findings are discussed. The importance and benefit of reforming pre-interrogation protocols using fair and feasible strategies that would disrupt suspects' cognitive fluency are emphasized. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  16. 28 CFR 30.13 - May the Attorney General waive any provision of these regulations?

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false May the Attorney General waive any... INTERGOVERNMENTAL REVIEW OF DEPARTMENT OF JUSTICE PROGRAMS AND ACTIVITIES § 30.13 May the Attorney General waive any provision of these regulations? In an emergency, the Attorney General may waive any provision of these...

  17. Efficacy of pre-ascent climbing route visual inspection in indoor sport climbing

    NARCIS (Netherlands)

    Sanchez, X.; Lambert, Ph; Jones, G.; Llewellyn, D. J.

    Pre-ascent climbing route visual inspection (route preview) has been suggested as a key climbing performance parameter although its role has never been verified experimentally. We examined the efficacy of this perceptual-cognitive skill on indoor sport climbing performance. Twenty-nine male

  18. 30 CFR 285.510 - May MMS reduce or waive my lease or grant payments?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May MMS reduce or waive my lease or grant... Financial Assurance Requirements Payments § 285.510 May MMS reduce or waive my lease or grant payments? (a) The MMS Director may reduce or waive the rent or operating fee or components of the operating fee...

  19. Pre-shipment preparations at the Savannah River Site - WSRC's technical basis to support DOE's approval to ship

    International Nuclear Information System (INIS)

    Thomas, Jay E.; Bickley, Donald W.; Conatser, E. Ray

    2000-01-01

    In the first four years of the Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Return Program following resumption of the SNF return program with the DOE-EIS ROD in May 1996, 13 shipments involving 77 casks with over 2,600 assemblies have been safely received and stored at the Savannah River Site (SRS). Each fuel type has gone through a rigorous pre-shipment preparation process that includes fuel characterization, criticality safety reviews, and operational reviews, culminating in the Department of Energy's (DOE's) authorization to ship. Ideally, the authorization to ship process should begin two years in advance of the fuel receipt with an agreement between the Department of Energy - Head Quarters (DOE-HQ) and the research reactor government on the conditions and protocol for the spent nuclear fuel return, with a target of DOE shipment authorization at least two months before facility loading. A visit by representatives from the Department of Energy - Savannah River (DOE-SR) and Westinghouse Savannah River Company (WSRC), DOE's Management and Operations (M and O) Contractor for the SRS, to the research reactor facility is then scheduled for the purpose of finalizing contractual arrangements (DOE-SR), facility assessments, and initial fuel inspections. An extensive effort is initiated at this time to characterize the fuel in a standard format as identified in the Appendix A attachment to the contract. The Appendix A must be finalized in an accurate and timely manner because it serves as the base reference document for WSRC and other involved stakeholders such as the cask owners and the competent authorities throughout the approval process. With the approval of the Appendix A, criticality safety reviews are initiated to evaluate the unloading and storage configurations. Operational reviews are conducted to allow for necessary adaptation of fuel handling facilities, procedures, and training. WSRC has proceduralized this process, 'Certification to Receive and

  20. Pre-service inspection program of the Block 1 of the Juragua NPP

    International Nuclear Information System (INIS)

    Mirabal Monteagudo, Juan de Dios

    1996-01-01

    The present work intends to explain the importance of a inspection program from pre-development of the components the stage submitted to pressure based on the existing regulation in the country and the information delivered by the manufacturers and this is compared with the requirements of the similar regulation adopted in the other western countries

  1. 49 CFR 17.13 - May the Secretary waive any provision of these regulations?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false May the Secretary waive any provision of these regulations? 17.13 Section 17.13 Transportation Office of the Secretary of Transportation INTERGOVERNMENTAL REVIEW OF DEPARTMENT OF TRANSPORTATION PROGRAMS AND ACTIVITIES § 17.13 May the Secretary waive any...

  2. Lean Construction Applications for Bridge Inspection

    Science.gov (United States)

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  3. 12 CFR 502.60 - When will OTS adjust, add, waive, or eliminate a fee?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false When will OTS adjust, add, waive, or eliminate a fee? 502.60 Section 502.60 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY ASSESSMENTS AND FEES Fees § 502.60 When will OTS adjust, add, waive, or eliminate a fee? Under...

  4. GCP inspections in Germany and Europe following the implementation of the Directive 2001/20/EC

    Directory of Open Access Journals (Sweden)

    Hundt, Ferdinand

    2009-03-01

    Full Text Available Background: The implementation of the Clinical Trials Directive 2001/20/EC and the Good Clinical Practice Directive 2005/28/EC fundamentally restructured and harmonized the conduct of clinical trials in Europe. GCP inspections – which affect study sites, laboratories, sponsors and contract research organizations (CRO alike – make up an important part of these regulations. A common understanding of how these regulations apply in daily life is however not always ensured. Methods: A working group of the Clinical Research/Quality Assurance subcommittee of the German Association of Research-Based Pharmaceutical Companies (VFA was established to outline the regulatory requirements, the experience gathered with inspections by means of a survey and to set up guidance on how to manage an inspection. Results and conclusions: The survey, conducted with the help of 15 pharmaceutical companies within the VFA, included a total of 224 inspections (74 inspections in Germany, 150 from other European countries. Most frequent findings in and outside Germany were related to “documentation” (40.5% vs. 21.3%, “investigational new drugs” (16.2% vs. 14.7%, “drug safety” (13.5% vs. 8% and “application for a clinical trial authorization” (5.4% vs. 12%. From a German perspective, key findings of this working group were the necessity for a clear differentiation of responsibilities between national and federal as well as international authorities, a harmonization of inspection procedures and topics, and a clarification of whether pre-study/on-study and pre-approval/post-approval GCP inspections of the federal higher authority are included in the “Zentralstelle der Länder für Gesundheitsschutz bei Arzneimitteln und Medizinprodukten” (ZLG requirements. The survey illustrated, that inspections usually are conducted at the investigational site, and that most of the findings are well known and thus could be prevented by communicating and discussing

  5. 43 CFR 30.152 - May the parties to an agreement waive valuation of trust property?

    Science.gov (United States)

    2010-10-01

    ... valuation of trust property? 30.152 Section 30.152 Public Lands: Interior Office of the Secretary of the... parties to an agreement waive valuation of trust property? The parties to a settlement agreement or a consolidation agreement may waive valuation of trust property otherwise required by regulation or the Secretary...

  6. Burn Pre-Approval Area, Geographic NAD83, LOSCO (2000) [burn_preapproval_area_LOSCO_2000

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a region dataset delineating the areas of offshore Louisiana having Regional Response Team VI (RRT 6) pre-approval for the use of in-situ burning, according...

  7. Pre-approval of Prescription Drug Advertisements in the Shadow of Central Hudson

    OpenAIRE

    Ginn, Clifford M.

    2003-01-01

    The article examines the effects of prescription drug advertising on patients and physicians, and explains how a requirement of pre-approval by the FDA for prescription drug advertisements could eliminate many of the problems such advertisements create, without limiting the benefits of advertising or violating the First Amendment of the U.S. Constitution.

  8. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Inspection of machines; minimum requirements... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum...

  9. 36 CFR 51.79 - May the Director waive payment of a franchise fee or other payments?

    Science.gov (United States)

    2010-07-01

    ... payment of a franchise fee or other payments? 51.79 Section 51.79 Parks, Forests, and Public Property....79 May the Director waive payment of a franchise fee or other payments? The Director may not waive the concessioner's payment of a franchise fee or other payments or consideration required by a...

  10. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Preparation of machines for inspection... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection...

  11. Dispersant Pre-Approval Area, Geographic NAD83, LOSCO (1999) d[ispersant_preapproval_area_LOSCO_1999

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a region dataset delineating the areas of offshore Louisiana having Regional Response Team VI (RRT 6) pre-approval for the use of dispersants to break up an...

  12. Development approach on usage of radiation and inspection of QA according to the change of approval procedure of safety regulatory guides

    International Nuclear Information System (INIS)

    Oh, B. J.; Ahn, H. Z.; Kim, S. W.; Yoo, S. O.; Kang, S. C.; Yang, S. H.; Han, S. J.; Kim, H. S.; Kim, H. J.

    2002-01-01

    In accordance with 2001 amendment of the Atomic Energy Act(AEA), KINS also amended its internal 'Regulation on Implementation of Entrusted AEA-related Work'. Up to now the nuclear safety-specialized institute has used its internally developed guidelines in the safety regulation. From now on, however, the institute will enhance the objectivity and transparency by having the instruments approved by the Ministry of Science ad Technology. In this paper, we introduced the major points and directions to be considered to the development of the safety regulatory guides on Inspection for the quality assurance of the nuclear reactor facilities and the use of radioisotopes, and review and inspection for dosimeter reading

  13. 20 CFR 30.627 - Under what circumstances will OWCP waive the statutory requirement to coordinate these benefits?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Under what circumstances will OWCP waive the statutory requirement to coordinate these benefits? 30.627 Section 30.627 Employees' Benefits OFFICE OF...' Compensation Benefits § 30.627 Under what circumstances will OWCP waive the statutory requirement to coordinate...

  14. 75 FR 48302 - Notice of Request for Extension of Approval of an Information Collection; Credit Account Approval...

    Science.gov (United States)

    2010-08-10

    ....gov ). FOR FURTHER INFORMATION CONTACT: For information on credit account approval for reimbursable..., at (301) 851-2908. SUPPLEMENTARY INFORMATION: Title: Credit Account Approval for Reimbursable... Inspection Service [Docket No. APHIS-2010-0071] Notice of Request for Extension of Approval of an Information...

  15. 42 CFR 433.113 - Reduction of FFP for failure to operate a system and obtain initial approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Reduction of FFP for failure to operate a system... ADMINISTRATION Mechanized Claims Processing and Information Retrieval Systems § 433.113 Reduction of FFP for failure to operate a system and obtain initial approval. (a) Except as waived under § 433.130 or 433.131...

  16. 48 CFR 552.246-70 - Source Inspection by Quality Approved Manufacturer.

    Science.gov (United States)

    2010-10-01

    ...) Inspection system and inspection of facilities. (1) The inspection system maintained by the Contractor under... Federal Standard 368 or the International Organization for Standardization (ISO) Standard 9001:2000 (Quality Management Systems—Requirements). A documented description of the inspection system shall be made...

  17. Software Formal Inspections Guidebook

    Science.gov (United States)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  18. 9 CFR 147.52 - Approved tests.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Approved tests. 147.52 Section 147.52 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Approved Tests § 147.52 Approved tests. (a) The procedures for the bacteriological examination of poultry...

  19. 9 CFR 317.4 - Labeling approval.

    Science.gov (United States)

    2010-01-01

    ... undue economic hardship; and (iv) An unfair competitive advantage would not result from the granting of... Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY... approval to the Food Labeling Division, Regulatory Programs, Food Safety and Inspection Service, and...

  20. 40 CFR 60.36e - Inspection guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Inspection guidelines. 60.36e Section...) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators § 60.36e Inspection guidelines. (a) For approval, a State plan shall...

  1. 49 CFR 1522.5 - TSA inspection authority.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false TSA inspection authority. 1522.5 Section 1522.5..., DEPARTMENT OF HOMELAND SECURITY SECURITY RULES FOR ALL MODES OF TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS General § 1522.5 TSA inspection authority. (a) Each validation firm and each validator...

  2. 41 CFR 102-118.420 - Can the Administrator of General Services waive the postpayment auditing provisions of this subpart?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can the Administrator of General Services waive the postpayment auditing provisions of this subpart? 102-118.420 Section 102-118... Transportation Audits § 102-118.420 Can the Administrator of General Services waive the postpayment auditing...

  3. Acceptance inspection plan 105KE Facility modifications for fuel retrieval subproject

    International Nuclear Information System (INIS)

    Shen, E.J.

    1998-01-01

    The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified, to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms)

  4. Acceptance inspection plan 105KW Facility modifications for fuel retrieval subproject

    International Nuclear Information System (INIS)

    Shen, E.J.

    1998-01-01

    The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of.work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms)

  5. 33 CFR 401.90 - Boarding for inspections.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Boarding for inspections. 401.90... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations General § 401.90 Boarding for inspections... approved means of boarding. Pigeon holes are not accepted as a means of boarding and an alternate safe...

  6. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  7. 9 CFR 355.34 - Labels, approval of, by Administrator.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Labels, approval of, by Administrator. 355.34 Section 355.34 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  8. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project

    Science.gov (United States)

    Fernández, Marcos; Poza, Montse

    2018-01-01

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes. PMID:29671799

  9. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project.

    Science.gov (United States)

    Portalés, Cristina; Casas, Sergio; Gimeno, Jesús; Fernández, Marcos; Poza, Montse

    2018-04-19

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes.

  10. 24 CFR 1000.8 - May provisions of these regulations be waived?

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false May provisions of these regulations be waived? 1000.8 Section 1000.8 Housing and Urban Development Regulations Relating to Housing and... HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES General § 1000.8 May provisions of these...

  11. Pathology Residents Comprise Inspection Team for a CAP Self-Inspection

    Directory of Open Access Journals (Sweden)

    Stacy G. Beal MD

    2017-03-01

    Full Text Available We report our experience at the University of Florida in which residents and fellows served as the inspection team for a College of American Pathologists (CAP self-inspection. We aimed to determine whether the CAP self-inspection could serve as a learning opportunity for pathology residents and fellows. To prepare for the inspection, we provided a series of 4 lunchtime seminars covering numerous laboratory management topics relating to inspections and laboratory quality. Preparation for the inspection began approximately 4 months prior to the date of the inspection. The intent was to simulate a CAP peer inspection, with the exception that the date was announced. The associate residency program director served as the team leader. All residents and fellows completed inspector training provided by CAP, and the team leader completed the team leader training. A 20 question pre- and posttest was administered; additionally, an anonymous survey was given after the inspection. The residents’ and fellows’ posttest scores were an average of 15% higher than on the pretest ( P < .01. The surveys as well as subjective comments were overwhelmingly positive. In conclusion, the resident’s and fellow’s experience as an inspector during a CAP self-inspection was a useful tool to learn accreditation and laboratory management.

  12. Automated ultrasonic inspection of nuclear plant components

    International Nuclear Information System (INIS)

    Baron, J.A.; Dolbey, M.P.

    1982-01-01

    For reasons of safety and efficiency, automated systems are used in performing ultrasonic inspection of nuclear components. An automated system designed specifically for the inspection of headers in a nuclear plant is described. In-service inspection results obtained with this system are shown to correlate with pre-service inspection results obtained by manual methods

  13. 31 CFR 359.70 - May Public Debt waive any provision in this part?

    Science.gov (United States)

    2010-07-01

    ... UNITED STATES SAVINGS BONDS, SERIES I Miscellaneous Provisions § 359.70 May Public Debt waive any... unnecessary hardship: (a) If such action would not be inconsistent with law or equity; (b) If it does not...

  14. 31 CFR 351.85 - May Public Debt waive any provision in this part?

    Science.gov (United States)

    2010-07-01

    ... UNITED STATES SAVINGS BONDS, SERIES EE Miscellaneous Provisions § 351.85 May Public Debt waive any... unnecessary hardship: (a) If such action would not be inconsistent with law or equity; (b) If it does not...

  15. Risk informed In-service Inspection

    International Nuclear Information System (INIS)

    Corak, Z.

    2003-01-01

    insights. It is expected that licensees will ask for modifications of plant's design, operation, and other activities that require NRC approval to incorporate risk insights into their ISI programs. In-service inspection program in which is incorporated risk insights is known as risk-informed in-service inspection programs, RI-ISI. Until the RI-ISI is approved for generic use, the staff expects that licensees will ask for modifications of ISI programs by requesting NRC to approve alternative inspection programs. Alternative inspection programs must meet 10 CFR 50.55a (a)(3)(i) which says that 'the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety'. As always, licensees should identify how the chosen approach, methods, data, and criteria are appropriate for the decisions that have to be made. RI-ISI can provide reduction of scope and frequency of inspections that may lead to higher risk. The higher risk means that a probability of failure or consequences are higher and shutdown of nuclear power plants is more likely to occur. RI-ISI can also provide extensive scope of inspection or increased frequency of inspection. (author)

  16. 31 CFR 370.46 - Are there any situations in which the Bureau of the Public Debt may waive these regulations?

    Science.gov (United States)

    2010-07-01

    ... or class of cases. We may do so if such action is not inconsistent with law and will not subject the... Bureau of the Public Debt may waive these regulations? 370.46 Section 370.46 Money and Finance: Treasury... Provisions § 370.46 Are there any situations in which the Bureau of the Public Debt may waive these...

  17. Automatic ultrasonic pre-service, and in-service inspection of pressurized components of the primary circuit of nuclear power stations

    International Nuclear Information System (INIS)

    Muller, G.P.; Hallermeier, L.; Heinrich, D.; Grabendorfer, W.; Rebrmann, M.

    1985-01-01

    Ultrasonic pre-service and especially in-service inspection activities on the primary circuit of nuclear power stations form an essential part of the maintenance work that must be performed throughout the lifetime to ensure plant integrity. Consequently, the equipment required to carry out these inspections must be continuously improved in respect of reliability, safety, accuracy and ease of handling in order to minimize disturbances and repairs and reduce radiation exposure of the personnel. The authors' discussion of technique, equipment and performance of automated ultrasonic inspection is based on 15 years of experience in the testing of components of the primary circuit in nuclear power stations. To cover all inspection areas of the RPV of a PWR, four different manipulators are required, two for the closure head, one for the studs and one for the cylindrical shell and bottom closure. The use of the newly developed equipment, which naturally meets all the recommendations of the licensing authorities, allows for the automatic inspection of the components of primary circuit of nuclear power stations and the thus helps to substantially decrease the radiation exposure of the personnel. All the manipulators and their control consoles were designed and manufactured by M.A.N., Nuremberg while the ultrasonic electronic system was developed by Krautkramer, Cologne

  18. Reuse inspection refort of the spent fuel cask

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. W.; Seo, K. S.; Ku, J. H.; Lee, J. C.; Bang, K. S.; Min, D. K. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-04-01

    This is the contract result report performed by KAERI under the contract with KPS for the reuse inspection of the KSC-4 No. 2 cask to receive the license for the reuse of next 5 years. According to the revision of the atomic regulations, all type B package should receive and pass the reuse inspection for every 5 years. This report contains the summary of the reuse inspection project, the details of the inspection methods and evaluation criteria, the documents which submitted to the KINS and the license approved by the KINS. 1 tabs. (Author)

  19. 48 CFR 552.211-83 - Availability for Inspection, Testing, and Shipment/Delivery.

    Science.gov (United States)

    2010-10-01

    ... approval and release by the Government inspector or (2) authorization to ship without Government inspection. (b) Failure to make supplies available for inspection and testing or to [Insert “ship” or “deliver... authorization to ship without Government inspection is received before ____*____ calendar days after receipt of...

  20. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Science.gov (United States)

    2010-10-01

    ... acceptance. 159.007-5 Section 159.007-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under...

  1. 14 CFR 125.507 - Fuel tank system inspection program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system inspection program. 125... Airworthiness and Safety Improvements § 125.507 Fuel tank system inspection program. (a) Except as provided in... fuel tank is installed under a field approval, before June 16, 2008, the certificate holder must submit...

  2. 14 CFR 91.1507 - Fuel tank system inspection program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Fuel tank system inspection program. 91... Airworthiness and Safety Improvements § 91.1507 Fuel tank system inspection program. (a) Except as provided in... fuel tank is installed under a field approval, before June 16, 2008, the operator must submit to the...

  3. 75 FR 35019 - Hampshire Paper Company; Notice Rejecting Application, Waiving Regulations, and Soliciting...

    Science.gov (United States)

    2010-06-21

    ... Paper Company; Notice Rejecting Application, Waiving Regulations, and Soliciting Applications June 15, 2010. On June 2, 2010, Hampshire Paper Company (Hampshire Paper), licensee for the Emeryville....\\1\\ \\1\\ Hampshire Paper was issued a major license for the project on June 17, 1982, for a term of 30...

  4. AECL experience in fuel channel inspection

    Energy Technology Data Exchange (ETDEWEB)

    Van Drunen, G. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Gunn, R. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Mayo, W.R. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Scott, D.A. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada)

    1999-06-01

    Inspection of CANDU fuel channels (FC) is performed to ensure safe and economic reactor operation. CANDU reactor FCs have features that make them a unique non-destructive testing (NDT) challenge. The thin, 4 mm pressure-tube wall means flaws down to about 0.1 mm deep must be reliably detected and characterized. This is one to two orders of magnitude smaller than is usually considered of significant concern for steel piping and pressure vessels. A second unique feature is that inspection sensors must operate in the reactor core--often within 20 cm of highly radioactive fuel. Work on inspection of CANDU reactor FCs at AECL dates back over three decades. In that time, AECL staff have provided equipment and conducted or supervised in-service inspections in about 250 FCs, in addition to over 8000 pre-service FCs. These inspections took place at every existing CANDU reactor except those in India and Romania. Early FC inspections focussed on measurement of changes in dimensions (gauging) resulting from exposure to a combination of neutrons, stress and elevated temperature. Expansion of inspection activities to include volumetric inspection (for flaws) started in the mid-1970s with the discovery of delayed hydride cracking in Pickering 3 and 4 rolled joints. Recognition of other types of flaw mechanisms in the 1980s led to further expansion in both pre-service and in-service inspections. These growing requirements, to meet regulatory as well as economic needs, led to the development of a wide spectrum of inspection technology that now includes tests for hydrogen concentration, structural integrity of core components, flaws, and dimensional change. This paper reviews current CANDU reactor FC inspection requirements. The equipment and techniques developed to satisfy these requirements are also described. The paper concludes with a discussion of work in progress in AECL aimed at providing state-of-the-art FC inspection services. (author)

  5. 29 CFR 1952.156 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... inspected and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.156 Section 1952.156..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS North Carolina § 1952...

  6. 29 CFR 1952.96 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... inspected and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.96 Section 1952.96..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS South Carolina § 1952...

  7. 29 CFR 1952.381 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... inspected and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.381 Section 1952.381..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Puerto Rico § 1952...

  8. System Enhancements for Mechanical Inspection Processes

    Science.gov (United States)

    Hawkins, Myers IV

    2011-01-01

    Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.

  9. 46 CFR 159.007-11 - Production inspections and tests: Yearly report.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Yearly report. 159.007-11 Section 159.007-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production...

  10. 75 FR 31746 - Notice of Request for Extension of Approval of an Information Collection; Importation of Mangoes...

    Science.gov (United States)

    2010-06-04

    ... Request: Extension of approval of an information collection. Abstract: The Plant Protection Act (PPA, 7 U... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2010-0052... Philippines AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  11. 76 FR 37054 - Notice of Request for Extension of Approval of an Information Collection; Importation of Longan...

    Science.gov (United States)

    2011-06-24

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0053... Taiwan AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an... approval of an information collection associated with regulations for the importation of longan from Taiwan...

  12. Inspection of licensee activities in emergency planning

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Gutierrez Ruiz, Luis Miguel; Bouvrie, E. des; Aro, Ilari; Gil, J.; Balloffet, Yves; Forsberg, Staffan; Klonk, H.; Lang, Hans-Guenter; Fichtinger, G.; Warren, T.; Manzella, P.; Gallo, R.; Koizumi, Hiroyoshi; Johnson, M.; Pittermann, P.

    1998-01-01

    The CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries Following discussions at several meetings on the topic of what is expected by the regulatory body regarding inspection criteria, WGIP proposed putting together a compilation of Member countries practices on regulatory inspection practices with respect to licensee emergency planning. CNRA approved this task and this report. Information was collected from a questionnaire which was issued in 1996. The report presents information on regulatory inspection activities with respect to emergency planning in NEA Member countries. The focus of the report is on the third section. It reviews the similarities and differences in inspection practices to evaluate compliance with the requirements over which the regulatory body (RB) has jurisdiction

  13. 5 CFR 8301.104 - Additional rules for employees of the Food Safety and Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... Food Safety and Inspection Service. 8301.104 Section 8301.104 Administrative Personnel DEPARTMENT OF....104 Additional rules for employees of the Food Safety and Inspection Service. Any employee of the Food Safety and Inspection Service not otherwise required to obtain approval for outside employment under...

  14. Proposed Changes to EPA's Transuranic Waste Characterization Approval Process

    International Nuclear Information System (INIS)

    Joglekar, R.D.; Feltcorn, E.M.; Ortiz, A.M.

    2003-01-01

    This paper describes the changes to the waste characterization (WC) approval process proposed in August 2002 by the U.S. Environmental Protection Agency (EPA or the Agency or we). EPA regulates the disposal of transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP) repository in Carlsbad, New Mexico. EPA regulations require that waste generator/storage sites seek EPA approval of WC processes used to characterize TRU waste destined for disposal at WIPP. The regulations also require that EPA verify, through site inspections, characterization of each waste stream or group of waste streams proposed for disposal at the WIPP. As part of verification, the Agency inspects equipment, procedures, and interviews personnel to determine if the processes used by a site can adequately characterize the waste in order to meet the waste acceptance criteria for WIPP. The paper discusses EPA's mandate, current regulations, inspection experience, and proposed changes. We expect that th e proposed changes will provide equivalent or improved oversight. Also, they would give EPA greater flexibility in scheduling and conducting inspections, and should clarify the regulatory process of inspections for both Department of Energy (DOE) and the public

  15. 7 CFR 1717.853 - Loan terms and conditions.

    Science.gov (United States)

    2010-01-01

    ... Accommodations and Subordinations for 100 Percent Private Financing § 1717.853 Loan terms and conditions. (a) Terms and conditions. A loan, bond or other financing instrument, for which a lien accommodation or... also waive its right of approval in other cases. RUS's decision to waive its right of approval will...

  16. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Science.gov (United States)

    2010-10-01

    ...'s procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND... meets the inspection and test procedures of the laboratory; and (3) Are accepted by the Commandant under...

  17. Quality assurance for IAEA inspection planning

    International Nuclear Information System (INIS)

    Markin, J.T.

    1986-01-01

    Under the provisions of the Treaty on Nonproliferation of Nuclear Weapons and other agreements with states, the International Atomic Energy Agency (IAEA) conducts inspections at nuclear facilities to confirm that their operation is consistent with the peaceful use of nuclear material. The Department of Safeguards at the IAEA is considering a quality assurance program for activities related to the planning of these facility inspections. In this report, we summarize recent work in writing standards for planning inspections at the types of facilities inspected by the IAEA. The standards specify the sequence of steps in planning inspections, which are: (1) administrative functions, such as arrangements for visas and travel, and communications with the state to confirm facility operating schedules and the state's acceptance of the assigned inspectors; (2) technical functions including a specification of the required inspection activities, determination of personnel and equipment resources, and a schedule for implementing the inspection activities at the facility; and (3) management functions, such as pre- and post-inspection briefings, where the planned and implemented inspection activities are reviewed

  18. 48 CFR 846.408-70 - Inspection of subsistence.

    Science.gov (United States)

    2010-10-01

    ... inspect for specification compliance before shipment; or (2) Personnel of the purchasing activity will... suppliers' own quality control system. (3) Experience with the proposed suppliers. (4) The pre-qualifying of... address where inspection will occur. (e) The contracting officer must furnish a copy of the purchase...

  19. Could FDA approval of pre-exposure prophylaxis make a difference? A qualitative study of PrEP acceptability and FDA perceptions among men who have sex with men

    OpenAIRE

    Underhill, Kristen; Morrow, Kathleen M.; Operario, Don; Mayer, Kenneth H.

    2014-01-01

    The FDA has approved tenofovir-emtricitabine for use as HIV pre-exposure prophylaxis, but it is unknown how approval may affect PrEP acceptability among US men who have sex with men. We conducted 8 focus groups among 38 Rhode Island MSM, including 3 groups among 16 male sex workers and 5 groups among 22 men in the general MSM community. Participants reported wide-ranging beliefs regarding consequences and meanings of FDA approval. Some participants would not use PrEP without approval, while o...

  20. In-service inspections of V-230 reactor

    International Nuclear Information System (INIS)

    Prepechal, J.

    1984-01-01

    It is stated that despite certain constraints the configuration of the WWER-440 is such that it allows to make in-service inspections on a fully satisfactory scale. Three factors are discussed whose existence is necessary for the implementation of in-service inspections. The program defining the scale of inspections is satisfactory with regard to the safety and reliability of reactor operation. Its further development must result in reducing time consumption and radiation burden of personnel. Regulations for the implementation and evaluation of inspections represent the weakest link in the system of in-service inspections. At present, various organizations are dealing with the said problem within international cooperation. Equipment for in-service inspections of WWER-440 reactors is relatively good. The most important knowledge is summed up gained from the ten pre-service and in-service inspections of reactors of this type made so far. (Z.M.)

  1. 7 CFR 1710.406 - Loan approval.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Loan approval. 1710.406 Section 1710.406 Agriculture... GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Application Requirements and Procedures for Loans § 1710.406 Loan approval. (a) A loan is approved when the Administrator...

  2. 76 FR 30091 - Notice of Request for Extension of Approval of an Information Collection; Accreditation of...

    Science.gov (United States)

    2011-05-24

    ... 2011. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2011-12751... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0026... Facilities AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  3. 75 FR 31748 - Notice of Request for Extension of Approval of an Information Collection; Importation of...

    Science.gov (United States)

    2010-06-04

    ..., this 28\\th\\ day of May 2010. Kevin Shea Acting Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2010-0053... Dwarfed Plants AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of...

  4. 76 FR 33192 - Notice of Request for Extension of Approval of an Information Collection; Phytosanitary Export...

    Science.gov (United States)

    2011-06-08

    ... 2011. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2011-14175... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0025... Certification AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  5. Remote controlled ultrasonic pre-service and in-service inspections of reactor pressure vessels

    International Nuclear Information System (INIS)

    Mueller, G.

    1990-01-01

    The first mechanised in-service inspection of the reactor pressure vessel on unit one of Eskom's Koeberg nuclear power station has been carried out. Since 1968 a whole range of manipulators to carry out remote controlled ultrasonic inspections of nuclear power station equipment has been developed. The inspection of a reactor pressure vessel using a central mast manipulator is described. 3 figs., 1 ill

  6. Rules on the Inspection of Gamma Radiography Equipment

    International Nuclear Information System (INIS)

    1981-01-01

    These Rules issued by the State Institute of Radiation Hygiene (SIS) set out the obligations of licences and vendors of gamma radiography equipment for purposes of quality control. The Rules provide for a programme of periodic inspections and services by personnel approved by SIS. (NEA)

  7. Chapter 4. Assessment and inspection of nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    Supervisory activity of Nuclear Regulatory Authority of the Slovak Republic (UJD) upon the safety of nuclear installations in compliance with the 'Atomic Act' and other legal regulations includes also inspection and assessment activities of UJD. Assessment activity of UJD in relation to nuclear installations lies in assessment of safety documentation for constructions realised as nuclear installations, or constructions through which changes are realised on nuclear installations. The scope of safety documentation required for the assessment is stipulated in the Atomic Act. In 2000 the assessment activity focused first of all on Unit 1 of NPP Bohunice after completing its Gradual Reconstruction Programme, on National Repository of Radioactive waste in Mochovce and on radioactive waste conditioning and treatment technology in Jaslovske Bohunice. Activities of UJD in assessment focused mainly on control of compliance with requirements for nuclear safety, assessment of commissioning programmes, operating procedures, limits and conditions, etc. The assessment of changes, which influence nuclear safety of nuclear installations in operation, realisation of which is conditioned by the approval from UJD, is a significant part of the assessment activity of UJD. Mainly it is the assessment of design changes, changes in limits and conditions, operating procedures, changes in programmes of periodical testing of equipment important in terms of nuclear safety, changes in physical protection of nuclear equipment, etc. The assessment of nuclear installations operational safety, based on assessment of operational events, on maintaining limits and conditions of safe operation, on operational safety performance indicators and on inspection results is a separate category in the assessment activity of UJD. Inspection activity specified in the 'Atomic Act' is governed by an internal guideline, an important part of which is an annual inspection plan that considers the following types of

  8. Military Food Inspection: Its History and Its Effect on Readiness

    Science.gov (United States)

    1991-03-15

    inspections. Establishments include commercial food plants such as animal slaughter houses, milk plants, bakeries , ice cream plants, and warehouses...establishments had never been checked for sanitation. Local bakeries had no concept of sanitation. The fresh fruits and vegetables being purchased from the Saigon... franchise in Vietnam. The approved ice needed to be identified by some means. The veterinary service planned to identify it by adding an approved Food

  9. 33 CFR 164.80 - Tests, inspections, and voyage planning.

    Science.gov (United States)

    2010-07-01

    ... searchlights. (5) Terminal gear. Visual inspection of tackle; of connections of bridle and towing pendant, if.... (2) Terminal gear. Visual inspection of tackle; of connections of bridle and towing pendant, if... under-keel and vertical clearances (air-gaps) for all bridges, ports, and berthing areas; (v) Pre...

  10. 78 FR 34636 - Notice of Request for Extension of Approval of an Information Collection; Importation of Mangoes...

    Science.gov (United States)

    2013-06-10

    ... 2013. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2013-13686... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0022... Philippines AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  11. 77 FR 50982 - Notice of Request for Extension of Approval of an Information Collection; Foreign Quarantine Notices

    Science.gov (United States)

    2012-08-23

    ... August 2012. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2012... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0062... AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an information...

  12. 76 FR 81466 - Notice of Request for Extension of Approval of an Information Collection; Importation of Small...

    Science.gov (United States)

    2011-12-28

    ..., this 19th day of December 2011. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0118... Seed AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  13. 78 FR 48644 - Notice of Request for Extension of Approval of an Information Collection; Plum Pox Compensation

    Science.gov (United States)

    2013-08-09

    ... Washington, DC, this 5th day of August, 2013. Kevin Shea, Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0066...: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an information...

  14. Quality assurance inspections in the transportation packaging supplier industry

    International Nuclear Information System (INIS)

    Jankovich, J.P.

    1991-01-01

    In this paper the quality assurance inspections of the transportation packaging supplier industry, conducted by the U.S. Nuclear Regulatory Commission (NRC) on a routine basis since 1989 are discussed. The term supplier is used to include designers, fabricators, and distributors that hold NRC approved Quality Assurance Programs and Certificates of Compliance for packagings to transport radioactive materials. The objective of the inspections is to provide assurance that transportation packagings are fabricated and procured in accordance with 10 CFR Parts 21 and 71 requirements. The inspections are conducted in a systematic and comprehensive manner, utilizing uniform inspection techniques in order to assure uniformity and comparability. During the April 1989 and May 1991 period approximately 21 inspections were conducted by the Transportation Branch, Office of Nuclear Material Safety and Safeguards of the NRC. The majority of the findings were identified in the areas of quality assurance procedures, control of special processes (e.g. welding, radiography), and maintenance of QA records

  15. Procedure for getting safety classed concrete structures approved by Finnish Radiation and Nuclear Safety Authority

    International Nuclear Information System (INIS)

    Halme, Ville-Juhani

    2015-01-01

    Posiva is preparing geological final disposal in the Finnish bedrock in Olkiluoto, Eurajoki. The final disposal facility includes encapsulation plant and underground repository. Most of the main civil structures are concrete structures. STUK is the supervising authority in civil structures. The National Building Code of Finland and STUK's Regulatory Guide on nuclear safety (YVL) are the most important instructions when constructing concrete structures into nuclear installation. Posiva has classified concrete structures in two classes according STUK's YVL-guidance: EYT (non-nuclear) and Safety Class 3 (SC 3, nuclear safety significance). When building SC 3 concrete structures, specific protocol must be followed. Protocol includes planned routines for design, construction, supervision, quality control (QC) and quality assurance (QA) activities. Documents relating concrete structures must be approved by Posiva and STUK before construction work. After structures have been designed and actual building is ongoing, there are two main steps. Before concreting, readiness inspection for concreting must be arranged. Readiness inspection will be arranged according to a specific plan and the date must be informed to STUK. After establishing readiness for concreting, casting work can begin. Once concrete structures are done, inspected and approved, final documentation according to a quality control plan will be reviewed by Posiva. After Posiva's approval, final documentation will be sent for STUK's approval. In the end STUK will give the permission for commissioning of the concrete structures after approved commissioning inspection. The document is made up of an abstract and a poster

  16. Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit[CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C

  17. Could FDA approval of pre-exposure prophylaxis make a difference? A qualitative study of PrEP acceptability and FDA perceptions among men who have sex with men.

    Science.gov (United States)

    Underhill, Kristen; Morrow, Kathleen M; Operario, Don; Mayer, Kenneth H

    2014-02-01

    The FDA has approved tenofovir-emtricitabine for use as HIV pre-exposure prophylaxis, but it is unknown how approval may affect PrEP acceptability among US men who have sex with men. We conducted 8 focus groups among 38 Rhode Island MSM, including 3 groups among 16 male sex workers and 5 groups among 22 men in the general MSM community. Participants reported wide-ranging beliefs regarding consequences and meanings of FDA approval. Some participants would not use PrEP without approval, while others perceived approval as irrelevant or less significant than other sources of information. Our results suggest that FDA approval sends a signal that directly shapes PrEP acceptability among some MSM, while indirect influences of approval may affect uptake by others. Efforts to educate MSM about PrEP can increase acceptability by incorporating information about FDA approval, and outreach strategies should consider how this information may factor into personal decisions about PrEP use.

  18. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Science.gov (United States)

    2010-10-01

    ... and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a) From...

  19. Orion Exploration Flight Test Post-Flight Inspection and Analysis

    Science.gov (United States)

    Miller, J. E.; Berger, E. L.; Bohl, W. E.; Christiansen, E. L.; Davis, B. A.; Deighton, K. D.; Enriquez, P. A.; Garcia, M. A.; Hyde, J. L.; Oliveras, O. M.

    2017-01-01

    The principal mechanism for developing orbital debris environment models, is to make observations of larger pieces of debris in the range of several centimeters and greater using radar and optical techniques. For particles that are smaller than this threshold, breakup and migration models of particles to returned surfaces in lower orbit are relied upon to quantify the flux. This reliance on models to derive spatial densities of particles that are of critical importance to spacecraft make the unique nature of the EFT-1's return surface a valuable metric. To this end detailed post-flight inspections have been performed of the returned EFT-1 backshell, and the inspections identified six candidate impact sites that were not present during the pre-flight inspections. This paper describes the post-flight analysis efforts to characterize the EFT-1 mission craters. This effort included ground based testing to understand small particle impact craters in the thermal protection material, the pre- and post-flight inspection, the crater analysis using optical, X-ray computed tomography (CT) and scanning electron microscope (SEM) techniques, and numerical simulations.

  20. Wolsong 3 and 4 steam generator tube inspection

    International Nuclear Information System (INIS)

    Jang, Kyoung Sik; Son, Tai Bong; Kwon, Dong Ki; Choi, Jin Hyuk

    2001-01-01

    During the pre-service inspection for Wolsong unit 3 and 4 in 1997/1998 respectively, 17 distorted roll transition indications (over expanded beyond tubesheet secondary face) were identified at the unit 4 (S/G B, D). Six(6) tubes out of these tubes were plugged in 1998. However the first periodic inspection identified additional 110 indications in 1999 and 2000. The additionally identified 110 indication call, not reported at the pre-service inspection, are; 2 not-finally-expanded-tubes and 108 distorted roll transition tubes. Design limit of each steam generator tube plugging is 6.4.%. Plugging was performed by the steam generator manufacturer under the warranty. When distorted roll transition indications were first identified on the unit 4 in 1998 the degree of over-expansion was measured using an inner dial-gage to make the disposition of nonconformance report. 2 Not-finally-expanded-tubes were plugged and 10 tubes out of 108 distorted roll transition tubes were also plugged as a preventive measure

  1. Application of corrosion screening tools for riser inspection

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud; Vijayan, S.

    2003-01-01

    As offshore facilities approach the end of their design life, owners would like to assess the condition and integrity of plant and equipment. Detailed inspection, including non-destructive testing (NDT), are implemented and results are utilised for predictive maintenance and estimating useful remaining life. Except for risk based inspection, the extent of surface coverage required would be more compared to inspection of pre-determined spots. Risers, for example, usually have several layers of coating that prevent use of conventional techniques for inspection of corrosion. Complete coverage requires access (including removal coatings and insulation). Inspection utilising the conventional NDT tools can be very slow and expensive. However, recent advances have forwarded the use of specialised NDT techniques that were developed for inspection of corrosion under insulation (CUI). This paper details two screening inspection tools, LIXI Profiler and RTD-INCOTEST that have been applied to inspection of risers. LIXI Profiler is based on attenuation of penetrating radiation by materials, and RTD-INCOTEST is based on decay of pulsed eddy current in materials. (Author)

  2. A structured approach to Exposure Based Waiving of human health endpoints under REACH developed in the OSIRIS project

    NARCIS (Netherlands)

    Marquart, H.; Meijster, T.; Bovenkamp, M. van de; Burg, W. ter; Spaan, S.; Engelen, J. van

    2011-01-01

    Within the REACH framework, but alsowithin OECD, there is understanding that for reasons of animal welfare, costs and logistics, it is important to limit the number of tests to be conducted. Exposure-based waiving (EBW) is a potentially important element in testing strategies. This publication

  3. 78 FR 37777 - Notice of Request for Extension of Approval of an Information Collection; Cooperative...

    Science.gov (United States)

    2013-06-24

    .... Done in Washington, DC, this 19th day of June 2013. Kevin Shea, Administrator, Animal and Plant Health... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0041... Survey AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  4. 49 CFR 222.41 - How does this rule affect Pre-Rule Quiet Zones and Pre-Rule Partial Quiet Zones?

    Science.gov (United States)

    2010-10-01

    ...-Rule Quiet Zone may be established by automatic approval and remain in effect, subject to § 222.51, if... Zone may be established by automatic approval and remain in effect, subject to § 222.51, if the Pre... 49 Transportation 4 2010-10-01 2010-10-01 false How does this rule affect Pre-Rule Quiet Zones and...

  5. Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit[CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV-284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C

  6. Development of in-service inspection system for core support graphite structures in the high temperature engineering test reactor (HTTR)

    Energy Technology Data Exchange (ETDEWEB)

    Sumita, Junya; Hanawa, Satoshi; Kikuchi, Takayuki; Ishihara, Masahiro [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2003-03-01

    Visual inspection of core support graphite structures using TV camera as in-service inspection and measurement of material characteristics using surveillance test specimens are planned in the High Temperature Engineering Test Reactor (HTTR) to confirm structural integrity of the core support graphite structures. For the visual inspection, in-service inspection system developed from September 1996 to June 1998, and pre-service inspection using the system was carried out. As the result of the pre-service inspection, it was validated that high quality of visual inspection with TV camera can be carried out, and also structural integrity of the core support graphite structures at the initial stage of the HTTR operation was confirmed. (author)

  7. Cost-risk optimization of nondestructive inspection level

    International Nuclear Information System (INIS)

    Johnson, D.P.

    1978-01-01

    This paper develops a quantitative methodology for determining the nondestructive inspection (NDI) level that will result in a minimum cost product considering both type one inspection errors, acceptance of defective material units, and type two inspection errors, rejection of sound material units. This methodology represents an advance over fracture mechanics - nondestructive inspection (FM-NDI) design systems that do not consider type two inspection errors or the pre-inspection material quality. The inputs required for the methodology developed in this paper are (1) the rejection probability as a function of inspection size and imperfection size, (2) the flaw frequency (FF), as a function of imperfection size, (3) the probability of failure given the material unit contains an imperfection of a given size as a function of that given size, (4) the manufacturing cost per material unit, (5) the inspection cost per material unit, and (6) the average cost per failure including indirect costs. Four methods are identified for determining the flaw-frequency and three methods are identified for determining the conditional failure probability (one of these methods is probabilistic fracture mechanics). Methods for determining the rejection probability are discussed elsewhere. The NDI-FF methodology can have significant impact where the cost of failures represents a significant fraction of the manufacturing costs, or when a significant fraction of the components are being rejected by the inspection. (Auth.)

  8. 76 FR 78225 - Notice of Request for Extension of Approval of an Information Collection; Importation of Citrus...

    Science.gov (United States)

    2011-12-16

    .... Type of Request: Extension of approval of an information collection. Abstract: The Plant Protection Act... activities, including inspections by national plant protection organization officials from Peru, grower... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0110...

  9. Effects of external inspection on sepsis detection and treatment: a study protocol for a quasiexperimental study with a stepped-wedge design.

    Science.gov (United States)

    Hovlid, Einar; Frich, Jan C; Walshe, Kieran; Nilsen, Roy M; Flaatten, Hans Kristian; Braut, Geir Sverre; Helgeland, Jon; Teig, Inger Lise; Harthug, Stig

    2017-09-05

    Inspections are widely used in health care as a means to improve the health services delivered to patients. Despite their widespread use, there is little evidence of their effect. The mechanisms for how inspections can promote change are poorly understood. In this study, we use a national inspection campaign of sepsis detection and initial treatment in hospitals as case to: (1) Explore how inspections affect the involved organizations. (2) Evaluate what effect external inspections have on the process of delivering care to patients, measured by change in indicators reflecting how sepsis detection and treatment is carried out. (3) Evaluate whether external inspections affect patient outcomes, measured as change in the 30-day mortality rate and length of hospital stay. The intervention that we study is inspections of sepsis detection and treatment in hospitals. The intervention will be rolled out sequentially during 12 months to 24 hospitals. Our effect measures are change on indicators related to the detection and treatment of sepsis, the 30-day mortality rate and length of hospital stay. We collect data from patient records at baseline, before the inspections, and at 8 and 14 months after the inspections. We use logistic regression models and linear regression models to compare the various effect measurements between the intervention and control periods. All the models will include time as a covariate to adjust for potential secular changes in the effect measurements during the study period. We collect qualitative data before and after the inspections, and we will conduct a thematic content analysis to explore how inspections affect the involved organisations. The study has obtained ethical approval by the Regional Ethics Committee of Norway Nord and the Norwegian Data Protection Authority. It is registered at www.clinicaltrials.gov (Identifier: NCT02747121). Results will be reported in international peer-reviewed journals. NCT02747121; Pre-results. © Article

  10. Review of current practices and requirements for the inspection of prestressed concrete pressure vessels

    International Nuclear Information System (INIS)

    Reimann, K.J.

    1980-12-01

    Code requirements for pre- and in-service inspection of prestressed concrete pressure vessels as utilized in gas-cooled reactors are reviewed and compared with practices and experiences during construction, commissioning, and operation of such reactors. The pre-service inspection relies heavily on embedded instrumentation for measurements of stresses, temperatures, and displacements. The same instrumentation is later used for in-service surveillance, which additionally includes visual examination of exposed surfaces, monitoring of tendon conditions, and measurement of tendon loads. Improvement of present monitoring instrumentation and/or techniques, rather than development of new in-service inspection methods, is recommended

  11. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  12. 3 CFR - Waiving the Prohibition on the Use of Economic Support Funds With Respect to Various Parties to...

    Science.gov (United States)

    2010-01-01

    ... 3 The President 1 2010-01-01 2010-01-01 false Waiving the Prohibition on the Use of Economic Support Funds With Respect to Various Parties to the Rome Statute Establishing the International Criminal...) with respect to Barbados, Bolivia, Costa Rica, Cyprus, Ecuador, Kenya, Mali, Mexico, Namibia, Niger...

  13. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... approve revisions to the Pennsylvania State Implementation Plan (SIP). The revision consists of a change... prior SIP-approved I/M program to change the duration of the timing of quality assurance audits...

  14. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  15. 78 FR 32233 - Notice of Request for Extension of Approval of an Information Collection; Importation of...

    Science.gov (United States)

    2013-05-29

    .... Done in Washington, DC, this 22nd day of May 2013. Kevin Shea, Acting Administrator, Animal and Plant... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0036... Dwarfed Plants AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of...

  16. 30 CFR 761.15 - Procedures for waiving the prohibition on surface coal mining operations within the buffer zone...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Procedures for waiving the prohibition on surface coal mining operations within the buffer zone of an occupied dwelling. 761.15 Section 761.15... surface coal mining operations within the buffer zone of an occupied dwelling. (a) This section does not...

  17. Scheduling and coordination for in-service inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Li Songbai

    1996-11-01

    Based on the practice and experiences of pre-service and in-service inspections for Daya Bay Nuclear Power Plant (NPP) by Research Institute of Nuclear Power Operation (RINPO) following RSEM code, requirements of utility and actual situation in China, the in-service inspection preparation for organization, techniques and equipment/tooling, materials, personnel and documentation is briefly described. And the scheduling and coordinating consideration for planed in-service inspection activities during NPP outage is emphatically introduced. (2 refs., 4 figs.)

  18. 78 FR 36506 - Notice of Request for Extension of Approval of an Information Collection; Importation of Plants...

    Science.gov (United States)

    2013-06-18

    ... 2013. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2013-14466... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0035] Notice of Request for Extension of Approval of an Information Collection; Importation of Plants for...

  19. 29 CFR 1952.356 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.356 Section 1952.356..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Arizona § 1952.356...

  20. 29 CFR 1952.206 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.206 Section 1952.206..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Minnesota § 1952.206...

  1. 29 CFR 1952.216 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.216 Section 1952.216..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Maryland § 1952.216...

  2. 29 CFR 1952.236 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.236 Section 1952.236..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Kentucky § 1952.236...

  3. 29 CFR 1952.296 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.296 Section 1952.296..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Nevada § 1952.296...

  4. 29 CFR 1952.226 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.226 Section 1952.226..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Tennessee § 1952.226...

  5. 29 CFR 1952.346 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.346 Section 1952.346..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Wyoming § 1952.346...

  6. 29 CFR 1952.266 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.266 Section 1952.266..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Michigan § 1952.266...

  7. 29 CFR 1952.315 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.315 Section 1952.315..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Hawaii § 1952.315...

  8. 29 CFR 1952.245 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.245 Section 1952.245..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Alaska § 1952.245...

  9. 29 CFR 1952.171 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.171 Section 1952.171..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS California § 1952.171...

  10. 29 CFR 1952.376 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.376 Section 1952.376..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.376...

  11. 29 CFR 1952.326 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.326 Section 1952.326..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Indiana § 1952.326...

  12. 29 CFR 1952.271 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.271 Section 1952.271..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Vermont § 1952.271...

  13. 29 CFR 1952.106 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.106 Section 1952.106..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.106...

  14. 29 CFR 1952.121 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.121 Section 1952.121..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Washington § 1952.121...

  15. Restaurant inspection frequency: The RestoFreq Study.

    Science.gov (United States)

    Medu, Olanrewaju; Turner, Hollie; Cushon, Jennifer A; Melis, Deborah; Rea, Leslie; Abdellatif, Treena; Neudorf, Cory O; Schwandt, Michael

    2017-03-01

    Foodborne illness is an important contributor to morbidity and health system costs in Canada. Using number of critical hazards as a proxy for food safety, we sought to better understand how to improve food safety in restaurants. We compared the current standard of annual inspections to twice-yearly inspections among restaurants "at risk" for food safety infractions. These were restaurants that had three or more elevated-risk inspection ratings in the preceding 36 months. We conducted a two-arm randomized controlled trial between November 2012 and October 2014. The intervention was twice-yearly routine restaurant inspection compared to standard once-yearly routine inspection. Included were all restaurants within Saskatoon Health Region that were assessed as "at risk", with 73 restaurants in the intervention arm and 78 in the control arm. Independent sample t-tests were conducted between groups to compare: i) average number of critical hazards per inspection; and ii) proportion of inspections resulting in a rating indicating an elevated hazard. Over time we noted statistically significant improvements across both study arms, in number of both critical food safety hazards (decreased by 61%) and elevated-risk inspection ratings (decreased by 45%) (p < 0.0001). We observed no significant differences between the two groups pre- or post-intervention. Results suggest increasing the number of annual routine inspections in high-risk restaurants was not associated with a significant difference in measures of compliance with food safety regulations. Findings of this study do not provide evidence supporting increased frequency of restaurant inspection from annually to twice annually.

  16. Inspection of the Sizewll 'B' reactor coolant pump flywheels

    International Nuclear Information System (INIS)

    McNulty, A.L.; Cheshire, A.

    1992-01-01

    The Sizewell ''B'' safety case has categorised some primary circuit items as components for which failure is considered to be incredible. These Incredibility of Failure (IOF) components are particularly critical in their safety function, and specially stringent and all embracing provisions are made in their design, manufacture, inspection and operation. These provisions are such as to limit the probability of failure to levels which are so low that it does not have to be taken into account and no steps are necessary to control the consequences. The reactor coolant pump flywheel is considered to be an IOF component. Consequently there is a need for rigorous inspection during both manufacture and in service (ISI). The ISI requirement results in the need for an automated inspection. There is therefore a prerequisite to perform a Pre-Service Inspection (PSI) for baseline fingerprinting purposes. Furthermore there is a requirement that the inspection procedure, the inspection equipment and the operators are validated at the Inspection Validation Centre (IVC) of the AEA Technology laboratories at Risley. Development work is described. (author)

  17. 78 FR 34636 - Notice of Request for Extension of Approval of an Information Collection; Importation of Unshu...

    Science.gov (United States)

    2013-06-10

    ... Washington, DC, this 5th day of June 2013. Kevin Shea, Acting Administrator, Animal and Plant Health... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0027... From Japan AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of...

  18. 29 CFR 1952.366 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... and copied during normal business hours at the following locations: Office of State Programs... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.366 Section 1952.366..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS New Mexico § 1952.366...

  19. 29 CFR 1952.116 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... copied during normal business hours at the following locations: Office of State Programs, Occupational... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.116 Section 1952.116..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Utah § 1952.116 Where...

  20. 29 CFR 1952.166 - Where the plan may be inspected.

    Science.gov (United States)

    2010-07-01

    ... copied during normal business hours at the following locations: Office of State Programs, Occupational... 29 Labor 9 2010-07-01 2010-07-01 false Where the plan may be inspected. 1952.166 Section 1952.166..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Iowa § 1952.166 Where...

  1. Proceedings of the international workshop on conduct of inspections and inspector qualification and training

    International Nuclear Information System (INIS)

    Grimes, B.K.

    1993-02-01

    In the Fall of 1991, the OECD Committee on Nuclear Regulatory Activities (CNRA) approved the proposal of the Working Group (WGIP) on Inspection Practices to hold a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the USNRC in Chattanooga, Tennessee. The workshop was held from August 29 to September 4, 1992. The workshop was preceded by an orientation briefing for facilitators and a get-acquainted reception for participants. The workshop began with a plenary introductory session and ended with a plenary conclusion and evaluation session. Individual discussion sessions have been cataloged separately

  2. 76 FR 78229 - Notice of Request for Extension of Approval of an Information Collection; Importation of Hass...

    Science.gov (United States)

    2011-12-16

    ... Plant Protection Act (PPA, 7 U.S.C. 7701 et seq.) authorizes the Secretary of Agriculture to restrict... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0106... From Peru AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an...

  3. Risk informed in-service inspection and testing in Spain

    International Nuclear Information System (INIS)

    Bros, Juan; Marcelles, Ignacio

    2002-01-01

    The Spanish nuclear regulatory authority, the Consejo de Seguridad Nuclear (CSN), requires the use of codes and standards in force in the country of origin of the plant technology. For this reason, the in-service inspection and testing programs applied at Spanish nuclear power plants basically adhere to the requirements of the ASME XI and ASME OM Codes. It is not surprising that when the earliest developments aimed at drawing up risk informed inservice inspection and testing programs were initiated within the framework of ASME, the Spanish industry should follows such developments very closely. In fact, persons within the Spanish nuclear industry joined different ASME committees involved in the development and approval of the various code cases encompassing these developments. Developments specific to the Spanish nuclear power plants were initiated at a time when the aforementioned reference documentation was in a very advanced stage of development/approval. Two clearly differentiated lines of work got under way: On the one hand, and as regards risk informed in-service testing programs, the American standards were used as the sole reference. In the case of risk informed in-service inspection programs, the Spanish nuclear power plant-owning utilities and the Consejo de Seguridad Nuclear decided to draw up a Spanish guideline that, although using the ASME developments as a reference, would have its own specific characteristics. In relation to the above, and referring to the chronology of the events, the activities performed to date in Spain are described

  4. 25 CFR 1000.229 - May a Tribe/Consortium propose a substitute for a regulation it wishes to be waived?

    Science.gov (United States)

    2010-04-01

    ... regulation it wishes to be waived? 1000.229 Section 1000.229 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Waiver of Regulations § 1000.229 May a Tribe...

  5. Exercise manual for the Augmented Computer Exercise for Inspection Training (ACE-IT) software

    Energy Technology Data Exchange (ETDEWEB)

    Dobranich, P.R.; Widney, T.W.; Goolsby, P.T. [Sandia National Labs., Albuquerque, NM (United States). Cooperative Monitoring Center and Regional Security; Nelson, J.D.; Evanko, D.A. [Ogden Environmental and Energy Services, Inc., Albuquerque, NM (United States)

    1997-09-01

    The on-site inspection provisions in many current and proposed arms control agreements require extensive preparation and training on the part of both the Inspected Party and the Inspection Team. Current training techniques include table-top inspections and practice inspections. The Augmented Computer Exercise for Inspection Training (ACE-IT), an interactive computer training tool, increases the utility of table-top inspections. ACE-IT has been designed to provide training for a hypothetical challenge inspection under the Chemical Weapons Convention (CWC); however, this training tool can be modified for other inspection regimes. Although ACE-IT provides training from notification of an inspection through post-inspection activities, the primary emphasis of ACE-IT is in the inspection itself--particularly with the concept of managed access. ACE-IT also demonstrates how inspection provisions impact compliance determination and the protection of sensitive information. The Exercise Manual supplements the ACE-IT software by providing general information on on-site inspections and detailed information for the CWC challenge inspection exercise. The detailed information includes the pre-inspection briefing, maps, list of sensitive items, medical records, and shipping records.

  6. PWR reactor vessel in-service-inspection according to RSEM

    International Nuclear Information System (INIS)

    Algarotti, Marc; Dubois, Philippe; Hernandez, Luc; Landez, Jean Paul

    2006-01-01

    Nuclear services experience Framatome ANP (an AREVA and Siemens company) has designed and constructed 86 Pressurized Water Reactors (PWR) around the world including the three units lately commissioned at Ling Ao in the People's Republic of China and ANGRA 2 in Brazil; the company provided general and specialized outage services supporting numerous outages. Along with the American and German subsidiaries, Framatome ANP Inc. and Framatome ANP GmbH, Framatome ANP is among the world leading nuclear services providers, having experience of over 500 PWR outages on 4 continents, with current involvement in more than 50 PWR outages per year. Framatome ANP's experience in the examinations of reactor components began in the 1970's. Since then, each unit (American, French and German companies) developed automated NDT inspection systems and carried out pre-service and ISI (In-Service Inspections) using a large range of NDT techniques to comply with each utility expectations. These techniques have been validated by the utilities and the safety authorities of the countries where they were implemented. Notably Framatome ANP is fully qualified to provide full scope ISI services to satisfy ASME Section XI requirements, through automated NDE tasks including nozzle inspections, reactor vessel head inspections, steam generator inspections, pressurizer inspections and RPV (Reactor Pressure Vessel) inspections. Intercontrole (Framatome ANP subsidiary dedicated in supporting ISI) is one of the leading NDT companies in the world. Its main activity is devoted to the inspection of the reactor primary circuit in French and foreign PWR Nuclear Power Plants: the reactor vessel, the steam generators, the pressurizer, the reactor internals and reactor coolant system piping. NDT methods mastered by Intercontrole range from ultrasonic testing to eddy current and gamma ray examinations, as well as dye penetrant testing, acoustic monitoring and leak testing. To comply with the high requirements of

  7. Good clinical practice regulatory inspections: Lessons for Indian investigator sites

    Directory of Open Access Journals (Sweden)

    R Marwah

    2010-01-01

    Full Text Available Regulatory inspections are important to evaluate the integrity of the data submitted to health authorities (HAs, protect patient safety, and assess adequacy of site/sponsor quality systems to achieve the same. Inspections generally occur after submission of data for marketing approval of an investigational drug. In recent years, there has been a significant increase in number of inspections by different HAs, including in India. The assessors/inspectors generally do a thorough review of site data before inspections. All aspects of ICH-GCP, site infrastructure, and quality control systems are assessed during the inspection. Findings are discussed during the close out meeting and a detailed inspection report issued afterward, which has to be responded to within 15-30 days with effective Corrective and Preventive Action Plan (CAPA. Protocol noncompliance, inadequate/inaccurate records, inadequate drug accountability, informed consent issues, and adverse event reporting were some of the most common findings observed during recent Food and Drug Administration (FDA inspections. Drug development is being increasingly globalized and an increased number of patients enrolled in studies submitted as part of applications come from all over the world including India. Because of the steep increase in research activity in the country, inexperienced sites, and more stakeholders, increased efforts will be required to ensure continuous quality and compliance. HAs have also made clear that enforcement will be increased and be swift, aggressive, and effective.

  8. Report of lower endplug welding, and testing and inspecting result for MONJU 1{sup th} reload core fuel assembly

    Energy Technology Data Exchange (ETDEWEB)

    Kajiyama, Takasi; Numata, Kazuaki; Ohtani, Seiji [Quality Assuranse Section, Technical Administration Division, Plutonium Fuel Center, Tokai Works, Japan Nuclear Cycle Development Inst., Tokai, Ibaraki (Japan); Kobayashi, Hiromi; Watanabe, Hiroaki; Goto, Tatsuro; Takahashi, Hideki; Nagasaku, Katsuhiko [Inspection Development Campany Ltd., Tokai, Ibaraki (Japan)

    2000-02-01

    The procedure and result of lower endplugwelding, Test and Inspection and Shipment of the 1{sup th} reload core fuel assembly (80 Fuel Assemblies) for the fast breeder reactor MONJU are reported, which had been examined and inspected in Tamatsukuri Branch, Material Insurance Office, Quality Assurance Section, Technical Administration Division, Plutonium Fuel Center (before: Inspection Section, Plutonium Fuel Division), from June 1994 to January 1996. The number of cladding tubes welded to the endplug were totally 13,804: 7,418 for Core - Inside of 43 fuel Assemblies and 6,836 for Core-Outside of 37 fuel Assemblies. 13,794 of them, 7,414 Core-Inside and 6,379 Core-Outside, were approved by the test and sent to Plutonium Fuel Center. 10 of them weren't approved mainly because of default welding. Disapproval rating was 0.07%. (author)

  9. An overview of in-service inspection for nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Takano, Eishiro

    1996-01-01

    In nuclear power stations, for maintaining the safety of machinery and equipment, it is stipulated to carry out periodic inspection. The contents of the periodic inspection and the inspections of important matters are explained. In-service inspection (ISI) is the nondestructive inspection for confirming the soundness of reactor pressure vessels, main pipings, valves and others. The stipulations on the scope and time of the periodic inspection and ISI, the course of introducing ISI into Japan, and the basic way of thinking on ISI are described. Pre-service inspection (PSI) is carried out for the purpose of collecting and recording the initial data for ISI. The range of the objects of nondestructive inspection and leak test and the range of the objects of leak test only are shown. As to nondestructive inspection, the parts to be inspected, the frequency of inspection and the methods of inspection, and the method of leak test are described. As the present state of inspection technology, the automatic ultrasonic flow detectors for reactor vessels, piping welded parts and reactor vessel stud bolts, and the eddy current flaw detector for steam generator tubes are explained. (K.I.)

  10. 9 CFR 201.71 - Scales; accurate weights, repairs, adjustments or replacements after inspection.

    Science.gov (United States)

    2010-01-01

    ... contractors, market agencies, dealers, packers, and live poultry dealers to weigh livestock, livestock.... All approved material is available for inspection at the National Archives and Records Administration... http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Also, it is...

  11. Analysis of inservice inspection relief requests

    International Nuclear Information System (INIS)

    Aldrich, D.A.; Cook, J.F.

    1989-08-01

    Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, ''Rules for Inservice Inspection of Nuclear Power Plant components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose,of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task

  12. A structured approach to Exposure Based Waiving of human health endpoints under REACH developed in the OSIRIS project.

    Science.gov (United States)

    Marquart, Hans; Meijster, Tim; Van de Bovenkamp, Marja; Ter Burg, Wouter; Spaan, Suzanne; Van Engelen, Jacqueline

    2012-03-01

    Exposure Based Waiving (EBW) is one of the options in REACH when there is insufficient hazard data on a specific endpoint. Rules for adaptation of test requirements are specified and a general option for EBW is given via Appendix XI of REACH, allowing waiving of repeated dose toxicity studies, reproductive toxicity studies and carcinogenicity studies under a number of conditions if exposure is very low. A decision tree is described that was developed in the European project OSIRIS (Optimised Strategies for Risk Assessment of Industrial Chemicals through Integration of Non-Test and Test Information) to help decide in what cases EBW can be justified. The decision tree uses specific criteria as well as more general questions. For the latter, guidance on interpretation and resulting conclusions is provided. Criteria and guidance are partly based on an expert elicitation process. Among the specific criteria a number of proposed Thresholds of Toxicological Concern are used. The decision tree, expanded with specific parts on absorption, distribution, metabolism and excretion that are not described in this paper, is implemented in the OSIRIS webtool on integrated testing strategies. Copyright © 2011 Elsevier Inc. All rights reserved.

  13. B Plant treatment, storage, and disposal (TSD) units inspection plan

    International Nuclear Information System (INIS)

    Beam, T.G.

    1996-01-01

    This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ''Dangerous Waste Regulations'' (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B Plant have been permitted for waste management activities. Included are the following TSD units: Cell 4 Container Storage Area; B Plant Containment Building; Low Level Waste Tank System; Organic Waste Tank System; Neutralized Current Acid Waste (NCAW) Tank System; Low Level Waste Concentrator Tank System. This inspection plan complies with the requirements of WAC 173-303. It addresses both general TSD facility and TSD unit-specific inspection requirements. Sections on each of the TSD units provide a brief description of the system configuration and the permitted waste management activity, a summary of the inspection requirements, and details on the activities B Plant uses to maintain compliance with those requirements

  14. Fourth and Fifth Amendment issues raised by Chemical Weapons Convention inspections

    Energy Technology Data Exchange (ETDEWEB)

    Tanzman, E.A. [Argonne National Lab., IL (United States). Economics and Law Section

    1994-10-21

    The Chemical Weapons Convention (CWC) offers a unique challenge to the United States system of constitutional law. This discussion is about the Fourth and Fifth Amendment issues raised by the CWC and about how federal implementing legislation can allow verification inspections to take place in the United States under the Chemical Weapons Convention while remaining in compliance with the Constitution. By implementing legislation, the author means a federal statute that would be enacted separately from Senate approval of the Convention itself. Although implementing legislation is a relatively unusual accompaniment to a treaty, it will be necessary to the CWC, and the Administration has submitted a bill that was under consideration in the last Congress and presumably will be reintroduced early next year. The Fourth and Fifth Amendment problems posed by the CWC arise from the verification inspection scheme embodied in the treaty. The CWC depends heavily on on-site inspections to verify compliance with its key requirements. These include destroying all chemicals weapons stockpiles and bringing potential chemical weapons precursors under international control. The Convention contains four distinct kinds of inspections: systematic inspections of chemical weapons storage and destruction facilities, routine inspections of various declared facilities, challenge inspections, and a variant on challenge inspections in cases of alleged use of chemical weapons. All inspections are supposed to be only as intrusive as necessary to carry out the Convention. These inspections will be carried out by inspectors employed by the Organization for the Prohibition of Chemical Weapons (OPCW), located in The Hague, which is responsible for enforcing the Convention. Generally, the inspected State Party is permitted to assign observers to accompany the inspectors.

  15. Proceedings of a specialist meeting on the ultrasonic inspection of reactor components

    International Nuclear Information System (INIS)

    1976-01-01

    Beside synthesis of two conferences on nondestructive testing and on inspection, the contributions of this conference are reporting experimental observations and research works on ultrasonic techniques, methods, procedures (pre-service or in-service) and equipment for the inspection of nuclear reactor components (pressure vessels, tubing and piping), generally in stainless steel (often austenitic or ferritic) material or in zirconium alloy. Some contributions are also dealing with the relationship between material microstructure and ultrasonic inspection method and equipment, or with the detection and sizing precision of flaws (cracks)

  16. Regulatory inspection practices on fuel elements and core lay-out at NPPs

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Liuhto, Pekka; Badel, D.; Klonk, H.; Seidel, F.; Fichtinger, G.; Manzella, P.; Koizumi, Hiroyoshi; Delgado, Jose Luis; Gutierrez Ruiz, Luis Miguel; Bouvrie, E. des; Gil, J.; Forsberg, Staffan; Wand, H.; Warren, Tom; Gallo, R.

    1998-01-01

    The basic description of the reactor core of a nuclear power plant (NPP) is an important part of the Safety Analysis Report in all countries. Due to increased interest by regulatory authorities in the Member countries, in 1996 WGIP proposed looking at inspection aspects on fuel elements and core lay-out at nuclear power plants. The CNRA subsequently approved proceeding with this report. The report deals primarily with inspection practices and inspection requirements during nuclear power plant (NPP) operation with special emphasis on refuelling procedures. All license related topics, such as fuel and core design (mechanical, neutronic, thermal-hydraulic), as well as inspection philosophy and practices on fuel fabrication are included as appropriate serving as background information and may not be completely described. WGIP members describe their country's inspection programme according to the structure of a questionnaire (appendix 1). The individual contributions are contained in the appendix 2 and are compiled within the main chapters (1 through 3). Report Structure: 1. Licensing and Quality Assurance (QA) requirements for nuclear fuel; 2. Regulatory inspection programme during NPP operation and refuelling outages; 3. Procedures for inspection practices and inspection programme. Appendix: Questionnaire and Country specific contributions. Contributions are presented by Belgium, Finland, France, Germany, Hungary, Italy, Japan, Mexico, The Netherlands, Spain, Sweden, Switzerland, United Kingdom, USA

  17. Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench Tonopah Test Range, Nevada, Calendar Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2001-06-01

    Post-closure monitoring requirements for the Roller Coaster Sewage Lagoons and North Disposal Trench (Corrective Action Unit [CAW 404]) (Figure 1) are described in Closure Report for Corrective Action Unit 404, Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, report number DOE/NV--187. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. Post-closure monitoring at CAU 404 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

  18. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site; Lantow, Tiffany A. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site

    2015-03-25

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

  19. Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Roller Coaster Sewage Lagoons and North Disposal Trench (Corrective Action Unit[CAW 404]) (Figure 1) are described in Closure Report for Corrective Action Unit 404, Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, report number DOE/NV-187. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. Post-closure monitoring at CAU 404 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C

  20. 14 CFR 414.9 - Pre-application consultation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Pre-application consultation. 414.9 Section 414.9 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING SAFETY APPROVALS Application Procedures § 414.9 Pre-application...

  1. 46 CFR 199.40 - Evaluation, testing and approval of lifesaving appliances and arrangements.

    Science.gov (United States)

    2010-10-01

    ... appliances and arrangements. 199.40 Section 199.40 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LIFESAVING APPLIANCES AND ARRANGEMENTS LIFESAVING SYSTEMS FOR CERTAIN INSPECTED VESSELS General § 199.40 Evaluation, testing and approval of lifesaving appliances and arrangements. (a) Each item of...

  2. Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complexes Tonopah Test Range, Nevada Calendar Year 2001; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2002-01-01

    Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of eight Corrective Action Sites (CASs), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the general location of the landfill cells. Figure 2 shows in more detail the location of the eight landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan, contained in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complexes, Tonopah Test Range, Nevada, report number DOE/NV-283, July 1999. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 424 consists of the following: (1) Site inspections conducted twice a year to evaluate the condition of the unit. (2) Verification that landfill markers and warning signs are in-place, intact, and readable. (3) Notice of any subsidence, erosion, unauthorized use, or deficiencies that may compromise the integrity of the landfill covers. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in

  3. French developments and experience in the field of inservice inspection

    International Nuclear Information System (INIS)

    Saglio, Robert; Destribats, M.-T.; Pigeon, Michel; Roule, Maurice; Touffait, A.-M.

    1979-01-01

    The French PWR nuclear plant program was at the origin of a large amount of R and D work in the field of inservice inspection. The actions which were undertaken may be split up into different levels: - the regulatory level, the R and D level, the design level, the flaw evaluation level. The first results of pre and inservice inspections are presented. The experience gained by French Atomic Energy Commission with new techniques like focussed ultrasonics transducers and multi frequencies Eddy current apparatus are discussed

  4. Activities for turbine maintenance: planning, implementation and evaluation of inspection results

    International Nuclear Information System (INIS)

    Azcue, J.; Sanchez, M. A.; Alvaro, M.

    2014-01-01

    The article will cover the most significant aspects of how Tecnatom carry out the turbine maintenance work, both from the point of view of the inspection itself as the pre-and post tasks associated. Thus, the issues that will be part of the article are the Manual Inspection Service (MISI) and the inspection database, ISI WEB. These tools are essential for planning field work and serve as a guide to run later turbine inspections in different plants. Following this introduction the inspection teams and the techniques used by Tecnatom will be described. finally, the article will contain a small mention about management studies of life and integrity analysis of the turbine that can be performed, as well as involvement in its safe operation that is derived from them. Ultimately, the intention is to provide a comprehensive approach to the issue in question, the turbine maintenance work, so that the reader can get an ideal of the whole process. (Author)

  5. Optimal Inspection and Repair Strategies for Structural Systems

    DEFF Research Database (Denmark)

    Sommer, A. M.; Nowak, A. S.; Thoft-Christensen, Palle

    1992-01-01

    and a design variable as optimization variables. A model for estimating the total expected costs for structural systems is given including the costs associated with the loss of individual structural members as well as the costs associated with the loss of at least one element of a particular group......A model for reliability-based repair and maintenance strategies of structural systems is described. The total expected costs in the lifetime of the structure are minimized with the number of inspections, the number and positions of the inspected points, the inspection efforts, the repair criteria...... of structural members and the costs associated with the simultaneous loss of all members of a specific group of structural members. The approach is based on the pre-posteriori analysis from the classical decision theory. Special emphasis is given to the problem of selecting the number of points in the structure...

  6. Survey on requirements for independent reviews and inspections of electrical and I and C equipment

    Energy Technology Data Exchange (ETDEWEB)

    Byman, Karin; Groenkvist, Stefan; Egerbo, Anders; Nilsson, Thomas (AaF Consult AB, Stockholm (Sweden))

    2009-03-15

    support from different expert organisations, for example, the Technical Research Centre of Finland (VTT). The Finnish regulations require that independent expert organisations be involved in certain steps of the licensing procedure for electrical and instrumentation equipment. Another example of independent involvement in the safety assurance procedure for installations in Finnish nuclear power plants is the type approval that is required for certain safety classed instrumentation equipment. The type approval shall be performed by an accredited type approval organisation. The German regulatory framework for nuclear activities is based on domestic regulations of the Federation and the Laender authorities. Detailed safety standards are formulated by The Nuclear Safety Standard Commission (KTA). There are no general differences between the safety licensing procedure for electrical and IandC equipment and the safety licensing procedure for mechanical pressure and load bearing equipment. A formal licensing procedure is only required for major modifications. Regardless of whether a modification is categorised as minor or major, the KTA safety standards provides the details of the safety assurance procedure for electrical and IandC equipment including, for example the design. Variations in the safety assurance procedure for modifications are decided upon on a case by case basis by the authority of the Land in question after discussions with the licence holder. Other general requirements for electrical and IandC equipment are specified in Guidelines from the Reactor Safety Commission (RSK). The responsibility for the supervision and licensing duties with regard to nuclear power plants is split between the Federal and Laender authorities. In the process of performing these duties, the authorities may engage expert organisations and the organisations that are engaged by the authorities of the Laender are the Technical Inspection Agencies (TUeV). The Technical Inspection Agencies

  7. The role of the United States Food Safety and Inspection Service after the Chernobyl accident

    Energy Technology Data Exchange (ETDEWEB)

    Engel, Ronald E; Randecker, Victor; Johnson, Wesley [Food Safety and Inspection Service, United States Department of Agriculture (United States)

    1989-09-01

    The Food Safety and Inspection Service (FSIS) of the United States Department of Agriculture (USDA) inspects domestic and imported meat and poultry food products to assure the public that they are safe, wholesome, not economically adulterated and properly labeled. The Service also monitors the activities of meat and poultry plants and related activities in allied industries, and establishes standards and approves labels for meat and poultry products. As part of its responsibility, shortly after the Chernobyl accident occurred, FSIS developed a plan to assess this accident's impact on domestically produced and imported meat and poultry.

  8. The role of the United States Food Safety and Inspection Service after the Chernobyl accident

    International Nuclear Information System (INIS)

    Engel, Ronald E.; Randecker, Victor; Johnson, Wesley

    1989-01-01

    The Food Safety and Inspection Service (FSIS) of the United States Department of Agriculture (USDA) inspects domestic and imported meat and poultry food products to assure the public that they are safe, wholesome, not economically adulterated and properly labeled. The Service also monitors the activities of meat and poultry plants and related activities in allied industries, and establishes standards and approves labels for meat and poultry products. As part of its responsibility, shortly after the Chernobyl accident occurred, FSIS developed a plan to assess this accident's impact on domestically produced and imported meat and poultry

  9. Survey on requirements for independent reviews and inspections of electrical and I and C equipment

    International Nuclear Information System (INIS)

    Byman, Karin; Groenkvist, Stefan; Egerbo, Anders; Nilsson, Thomas

    2009-03-01

    support from different expert organisations, for example, the Technical Research Centre of Finland (VTT). The Finnish regulations require that independent expert organisations be involved in certain steps of the licensing procedure for electrical and instrumentation equipment. Another example of independent involvement in the safety assurance procedure for installations in Finnish nuclear power plants is the type approval that is required for certain safety classed instrumentation equipment. The type approval shall be performed by an accredited type approval organisation. The German regulatory framework for nuclear activities is based on domestic regulations of the Federation and the Laender authorities. Detailed safety standards are formulated by The Nuclear Safety Standard Commission (KTA). There are no general differences between the safety licensing procedure for electrical and IandC equipment and the safety licensing procedure for mechanical pressure and load bearing equipment. However, a formal licensing procedure is only required for major modifications. Regardless of whether a modification is categorised as minor or major, the KTA safety standards provides the details of the safety assurance procedure for electrical and IandC equipment including, for example the design. Variations in the safety assurance procedure for modifications are decided upon on a case by case basis by the authority of the Land in question after discussions with the licence holder. Other general requirements for electrical and IandC equipment are specified in Guidelines from the Reactor Safety Commission (RSK). The responsibility for the supervision and licensing duties with regard to nuclear power plants is split between the Federal and Laender authorities. In the process of performing these duties, the authorities may engage expert organisations and the organisations that are engaged by the authorities of the Laender are the Technical Inspection Agencies (TUeV). The Technical Inspection

  10. 24 CFR 108.15 - Pre-occupancy conference.

    Science.gov (United States)

    2010-04-01

    ... plan and may schedule a pre-occupancy conference. Such pre-occupancy conference shall be held prior to initiation of sales or rental marketing activities. At this conference, the previously approved AFHM plan... days prior to engaging in sales or rental marketing activities. Upon receipt of the Notification of...

  11. Value of information-based inspection planning for offshore structures

    DEFF Research Database (Denmark)

    Irman, Arifian Agusta; Thöns, Sebastian; Leira, Bernt J.

    2017-01-01

    with each inspection strategy. A simplified and generic risk-based inspection planning utilizing pre- posterior Bayesian decision analysis had been proposed by Faber et al. [1] and Straub [2]. This paper provides considerations on the theoretical background and a Value of Information analysis......-based inspection planning. The paper will start out with a review of the state-of-art RBI planning procedure based on Bayesian decision theory and its application in offshore structure integrity management. An example of the Value of Information approach is illustrated and it is pointed to further research......Asset integrity and management is an important part of the oil and gas industry especially for existing offshore structures. With declining oil price, the production rate is an important factor to be maintained that makes integrity of the structures one of the main concerns. Reliability based...

  12. Green offal inspection of cattle, small ruminants and pigs in the United Kingdom: Impact assessment of changes in the inspection protocol on likelihood of detection of selected hazards.

    Science.gov (United States)

    Blagojevic, Bojan; Dadios, Nikolaos; Reinmann, Karin; Guitian, Javier; Stärk, Katharina D C

    2015-06-01

    The changes in detection of selected public and animal health as well as welfare hazards due to the change in current inspection of green offal in cattle, small ruminants and pigs were assessed. With respect to public health and animal health, the conditional likelihood of detection with the current green offal inspection was found to be low for eleven out of the twenty-four selected hazard-species pairings and very low for the remaining thirteen pairings. This strongly suggests that the contribution of current green offal inspection to risk mitigation is very limited for public and animal health hazards. The removal of green offal inspection would reduce the detection of some selected animal welfare conditions. For all selected public and animal health as well as welfare hazards, the reduced detection could be compensated with other pre-harvest, harvest and/or post-harvest control measures including existing meat inspection tasks. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Line-scan inspection of conifer seedlings

    Science.gov (United States)

    Rigney, Michael P.; Kranzler, Glenn A.

    1993-05-01

    Almost two billion conifer seedlings are produced in the U.S. each year to support reforestation efforts. Seedlings are graded manually to improve viability after transplanting. Manual grading is labor-intensive and subject to human variability. Our previous research demonstrated the feasibility of automated tree seedling inspection with machine vision. Here we describe a system based on line-scan imaging, providing a three-fold increase in resolution and inspection rate. A key aspect of the system is automatic recognition of the seedling root collar. Root collar diameter, shoot height, and projected shoot and root areas are measured. Sturdiness ratio and shoot/root ratio are computed. Grade is determined by comparing measured features with pre-defined set points. Seedlings are automatically sorted. The precision of machine vision and manual measurements was determined in tests at a commercial forest nursery. Manual measurements of stem diameter, shoot height, and sturdiness ratio had standard deviations three times those of machine vision measurements. Projected shoot area was highly correlated (r2 equals 0.90) with shoot volume. Projected root area had good correlation (r2 equals 0.80) with root volume. Seedlings were inspected at rates as high as ten per second.

  14. Inspection of Emergency Arrangements

    International Nuclear Information System (INIS)

    2013-01-01

    NPPs. - Where RBs have an influence over land use around NPPs, they use the knowledge of their local or resident inspectors to inform decisions. - Inspectors check that appropriate action levels or criteria to identify an actual or radiological emergency are clearly defined and readily available to decision makers. - When observing emergency exercises inspectors check that: an appropriate and timely declaration is made, plant operators respond in accordance with the emergency plan and emergency instructions, and an appropriate level of response is initiated on and off-site. - RBs conduct follow-up inspections after real events, to ensure that the correct emergency response has been followed. - Inspectors verify that reliable data will be used to support the evaluation of environmental impact from a nuclear or radiological emergency, to the extent that this is within the jurisdiction of the RB. - Routine inspections and emergency exercise observations include a check that lines of communication are sufficiently resilient. - When observing emergency exercises inspectors, where practicable, check that timely, accurate and consistent information is provided to the public, in accordance with the off-site emergency plan. - RBs inspect the ability of the operator to give accurate medical and radiological information about casualties, to enable the correct treatment to be given. - Additional emergency equipment that is held in reserve off-site, provided to enhance resilience (post Fukushima), is included in the RB planned inspection and/or emergency exercise programme. - Inspectors check that licensee staff are adequately trained to connect and use additional equipment provided to enhance resilience. - Inspectors utilise the NPP operator's approved on-site emergency plan when inspecting on-site emergency arrangements. - RBs include human factors staff in emergency exercise evaluation teams to consider safety culture and human performance. - RBs consider the need for exercise

  15. A Hybrid CPU/GPU Pattern-Matching Algorithm for Deep Packet Inspection.

    Directory of Open Access Journals (Sweden)

    Chun-Liang Lee

    Full Text Available The large quantities of data now being transferred via high-speed networks have made deep packet inspection indispensable for security purposes. Scalable and low-cost signature-based network intrusion detection systems have been developed for deep packet inspection for various software platforms. Traditional approaches that only involve central processing units (CPUs are now considered inadequate in terms of inspection speed. Graphic processing units (GPUs have superior parallel processing power, but transmission bottlenecks can reduce optimal GPU efficiency. In this paper we describe our proposal for a hybrid CPU/GPU pattern-matching algorithm (HPMA that divides and distributes the packet-inspecting workload between a CPU and GPU. All packets are initially inspected by the CPU and filtered using a simple pre-filtering algorithm, and packets that might contain malicious content are sent to the GPU for further inspection. Test results indicate that in terms of random payload traffic, the matching speed of our proposed algorithm was 3.4 times and 2.7 times faster than those of the AC-CPU and AC-GPU algorithms, respectively. Further, HPMA achieved higher energy efficiency than the other tested algorithms.

  16. 46 CFR 153.812 - Inspection for Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inspection for Certificate of Inspection. 153.812... CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Testing and Inspection § 153.812 Inspection for Certificate of Inspection. The rules governing the...

  17. Advanced Approach of Reactor Pressure Vessel In-service Inspection

    International Nuclear Information System (INIS)

    Matokovic, A.; Picek, E.; Pajnic, M.

    2006-01-01

    The most important task of every utility operating a nuclear power plant is the continuously keeping of the desired safety and reliability level. This is achieved by the performance of numerous inspections of the components, equipment and system of the nuclear power plant in operation and in particular during the scheduled maintenance periods at re-fueling time. Periodic non-destructive in-service inspections provide most relevant criteria of the integrity of primary circuit pressure components. The task is to reliably detect defects and realistically size and characterize them. One of most important and the most extensive examination is a reactor pressure vessel in-service inspection. That inspection demand high standards of technology and quality and continual innovation in the field of non-destructive testing (NDT) advanced technology as well as regarding reactor pressure vessel tool and control systems. A remote underwater contact ultrasonic technique is employed for the examination of the defined sections (reactor welds), whence eddy current method is applied for clad surface examinations. Visual inspection is used for examination of the vessel inner surface. The movement of probes and data positioning are assured by using new reactor pressure vessel tool concept that is fully integrated with NDT systems. The successful performance is attributed thorough pre-outage planning, training and successful performance demonstration qualification of chosen NDT techniques on the specimens with artificial and/or real defects. Furthermore, use of advanced approach of inspection through implementation the state of the art examination equipment significantly reduced the inspection time, radiation exposure to examination personnel, shortening nuclear power plant outage and cutting the total inspection costs. The advanced approach as presented in this paper offer more flexibility of application (non-destructive tests, local grinding action as well as taking of boat samples

  18. Nuclear containment systems and in-service inspection status of Korea nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Jihong, Park; Jaekeun, Hong; Banuk, Park [Korea Institute of Machinery and Materials, Dept. of Authorized Test and Evaluation, Kyungnam (Korea, Republic of)

    2007-07-01

    20 unit nuclear power plants in Korea have been operated and maintained since the first unit started in commercial service in 1978. Most recently 4 units were under construction and several units were planned to be constructed. by industries. 4 types of nuclear containment systems have been constructed until now: first, metal containments, then pre-stressed concrete containments with grouted tendon systems, followed by pre-stressed concrete containments with un-grouted tendon systems, and Korea standard nuclear containments. All the nuclear containments should be inspected periodically. Therefore for periodic in-service inspection, several appropriate technical requirements should be applied differently depending on the specific nuclear containment types. With the changes of times, nuclear containment systems have undergone a remarkable change, and finally nuclear containment system of Korea standard nuclear power plant was settled down, and as a matter of course it dominates the trend of present and future nuclear containment systems. Overall in-service inspection results of most Korea nuclear containments have not showed any serious evidence of degradation.

  19. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 3, 0.03 Superstructure

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    General information is presented on asset determinant factor/CAS profile codes/CAS cost process; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for beams; pre-engineered building systems; floors; roof structure; stairs; and fireproofing.

  20. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  1. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  2. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  3. 77 FR 65854 - Notice of Request for Extension of Approval of an Information Collection; Irradiation...

    Science.gov (United States)

    2012-10-31

    ...: Extension of approval of an information collection. Abstract: Under the Plant Protection Act (7 U.S.C. 7701....008 hours per response. Respondents: Foreign plant protection services, irradiation facility personnel... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0070...

  4. 76 FR 30090 - Notice of Request for Extension of Approval of an Information Collection

    Science.gov (United States)

    2011-05-24

    .... Done in Washington, DC, this 18th day of May 2011. Kevin Shea, Acting Administrator, Animal and Plant... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0033] Notice of Request for Extension of Approval of an Information Collection AGENCY: Animal and Plant Health...

  5. 77 FR 59590 - Notice of Request for Extension of Approval of an Information Collection; National Animal Health...

    Science.gov (United States)

    2012-09-28

    ...In accordance with the Paperwork Reduction Act of 1995, this notice announces the Animal and Plant Health Inspection Service's intention to request an extension of approval of an information collection associated with the National Animal Health Reporting System.

  6. Advanced inspection technology for non intrusive inspection (NII) program

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud

    2003-01-01

    In the current economic environment, plants and facilities are under pressure to introduced cost saving as well as profit maximising measures. Among the many changes in the way things are run is a move towards Risk Based Inspection (RBI), with an emphasis on longer operating periods between shutdowns as well as to utilise components to their maximum capability. Underpinning and RBI program requires good data from an effective online inspections program, which would not require the shutdown of critical components. One methodology of online inspection is known as Non Intrusive Inspection (NII), an inspection philosophy with the objective of replacing internal inspection of a vessel by doing Non Destructive Testing (NDT) and inspections externally. To this end, a variety of advanced NDT techniques are needed to provide accurate online measurements. (Author)

  7. Drone Mission Definition and Implementation for Automated Infrastructure Inspection Using Airborne Sensors.

    Science.gov (United States)

    Besada, Juan A; Bergesio, Luca; Campaña, Iván; Vaquero-Melchor, Diego; López-Araquistain, Jaime; Bernardos, Ana M; Casar, José R

    2018-04-11

    This paper describes a Mission Definition System and the automated flight process it enables to implement measurement plans for discrete infrastructure inspections using aerial platforms, and specifically multi-rotor drones. The mission definition aims at improving planning efficiency with respect to state-of-the-art waypoint-based techniques, using high-level mission definition primitives and linking them with realistic flight models to simulate the inspection in advance. It also provides flight scripts and measurement plans which can be executed by commercial drones. Its user interfaces facilitate mission definition, pre-flight 3D synthetic mission visualisation and flight evaluation. Results are delivered for a set of representative infrastructure inspection flights, showing the accuracy of the flight prediction tools in actual operations using automated flight control.

  8. Mochovce site

    International Nuclear Information System (INIS)

    1997-01-01

    In Mochovce site the construction of four units of WWER 440 NPP with V-213 type of reactor is being carried out. The financing of Mochovce units completion was resolved in April 1996. The completion work commenced at the construction site under leadership of SKODA Prague, the general supplier. The completion work on building part and tests of constructional electric distributions and lightning constructors started. The revisions in technological part were finished, and final protocols from revisions are the basis for starting of completion work. The assembly of transport container anchorage,ventilation system in hermetic areas and hermetic coverage of pools for stored spent nuclear fuel is being carried out. The pre-completion tests of instrumentation and control of ventilation systems, individual dosimetric control in medical station, and tests of nuclear programme according to commissioning and assembling work schedule at the equipment for physical protection of the NPP area started. Inspection activities at Mochovce were performed in accordance with inspection plan for 1996. Evaluation of routine inspections was performed by means of quarterly protocols. Main findings from the inspections performed in Mochovce were in the following areas: (a) deficiencies in the knowledge of the respective regulation and conditions from the Resolution of the state regulatory body, concerning selected employees; (b) training of the selected employees; (c) aim of the measures imposes by inspectors is to eliminate deficiencies in preparation of programmes for pre-completion and completion testing. NRA SR assessment activities at Mochovce NPP were focused mainly on approving and inspecting of design modification to approving programmes for pre-completion and completion testing of system s and equipment and on approving quality assurance programmes. The suggestions of international missions, which reviewed Mochovce safety in the years, were taken into consideration in the programme

  9. 76 FR 78230 - Notice of Request for Extension of Approval of an Information Collection; Requirements for...

    Science.gov (United States)

    2011-12-16

    ...: Extension of approval of an information collection. Abstract: The Plant Protection Act (PPA, 7 U.S.C. 7701... plant protection organizations, and producers. Estimated annual number of respondents: 37. Estimated... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0112...

  10. 77 FR 16805 - Notice of Request for Extension and Revision of a Currently Approved Information Collection...

    Science.gov (United States)

    2012-03-22

    ... Monitoring System and the Food Safety Mobile Questionnaire) AGENCY: Food Safety and Inspection Service, USDA... Safety Mobile questionnaire. The approval for this information collection is due to expire. FSIS is... post their personal contact information--mailing address, email address, and telephone number-- on the...

  11. Calculation of frequency of optimal inspection in non-notice inspection game

    International Nuclear Information System (INIS)

    Kumakura, Shinichi; Gotoh, Yoshiki; Kikuchi, Masahiro

    2011-01-01

    We consider a non-notice inspection game between an inspection party, who verifies absence of diversion of nuclear materials and misuse of nuclear facility, and a facility operator, who tries them in a nuclear facility. In the game, the payoff for each player, inspection party and facility operator, is composed of various elements (parameters) such as facility type, a type of nuclear material, number of inspection and others. Their payoffs consist of profits and costs (minus profit). Because of random nature by non-notice inspection, its deterrence effect and inspection number could have the potential to affect their payoffs. In this paper, their payoffs taking into consideration of the inspection environment above are represented as a function of inspection number. Then, the optimal number is calculated from a condition on their payoffs for number of inspection. Comparable statics analysis is performed in order to observe the change of inspection number which is equilibrium point by changing these parameters including deterrence effect, because the number derived depends on each parameter within the inspection environment. Based on the analysis results, necessary conditions to reduce the inspection number keeping inspection effect are pointed out. (author)

  12. 76 FR 32333 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania for the purpose of changing the...). Specifically, the Commonwealth is amending a provision of its prior SIP-approved I/M program to amend the...

  13. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 426: Cactus Spring Waste Trenches (TTR); (5) CAU 453: Area 9 UXO Landfill (TTR); (6) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR); and (7) CAU 487: Thunderwell Site (TTR). The annual post-closure inspections were conducted May 5-6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections

  14. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-05-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5–6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation

  15. Radioactive waste storage facilities, involvement of AVN in inspection and safety assessment

    International Nuclear Information System (INIS)

    Simenon, R.; Smidts, O.

    2006-01-01

    The legislative and regulatory framework in Belgium for the licensing and the operation of radioactive waste storage buildings are defined by the Royal Decree of 20 July 2001 (hereby providing the general regulations regarding to the protection of the population, the workers and the environment against the dangers of ionising radiation). This RD introduces in the Belgian law the radiological protection and ALARA-policy concepts. The licence of each nuclear facility takes the form of a Royal Decree of Authorization. It stipulates that the plant has to be in conformity with its Safety Analysis Report. This report is however not a public document but is legally binding. Up to now, the safety assessment for radioactive waste storage facilities, which is implemented in this Safety Analysis Report, has been judged on a case-by-case basis. AVN is an authorized inspection organisation to carry out the surveillance of the Belgian nuclear installations and performs hereby nuclear safety assessments. AVN has a role in the nuclear safety and radiation protection during all the phases of a nuclear facility: issuance of licenses, during design and construction phase, operation (including reviewing and formal approval of modifications) and finally the decommissioning. Permanent inspections are performed on a regular basis by AVN, this by a dedicated site inspector, who is responsible for a site of an operator with nuclear facilities. Besides the day-to-day inspections during operation there are also the periodic safety reviews. AVN assesses the methodological approaches for the analyses, reviews and approves the final studies and results. The conditioned waste in Belgium is stored on the Belgoprocess' sites (region Mol-Dessel) for an intermediate period (about 80 years). In the meantime, a well-defined inspection programme is being implemented to ensure that the conditioned waste continues to be stored safely during this temporary storage period. This programme was draw up by

  16. Linaclotide: first global approval.

    Science.gov (United States)

    McWilliams, Vanessa; Whiteside, Glenn; McKeage, Kate

    2012-11-12

    Linaclotide is a once-daily, orally administered, first-in-class agonist of guanylate cyclase-C that is minimally absorbed. It is being developed to treat gastrointestinal disorders by Ironwood Pharmaceuticals and its partners, Forest Laboratories (North America), Almirall (Europe) and Astellas Pharma (Asia-Pacific). Linaclotide has received its first global approval in the US for the treatment of constipation-predominant irritable bowel syndrome (IBS-C) and chronic idiopathic constipation (CIC), and a marketing submission has been filed in the EU for IBS-C. This article summarizes the milestones in the development of linaclotide leading to this first approval for IBS-C and CIC. This profile has been extracted and modified from the Adis R&D Insight drug pipeline database. Adis R&D Insight tracks drug development worldwide through the entire development process, from discovery, through pre-clinical and clinical studies to market launch.

  17. Eddy current inspection of stationary blade rings

    International Nuclear Information System (INIS)

    Krzywosz, K.J.; Hastings, S.N.

    1994-01-01

    Stationary turbine blade rings in a US power plant have experienced chloride-induced cracking. Failure analysis determined two types of cracking mechanisms: corrosion fatigue cracking confined to the leading edge of the outer shroud; and stress corrosion cracking present all over the blade surface. Fluorescent dye penetrant is typically used to detect and size cracks. However, it requires cleaning the blade rings by sandblasting to obtain reliable inspection results. Sand blasting in turn requires sealing the lower half of the turbine housing to prevent sand from contaminating the rest of the power plant components. Furthermore, both the penetrant examination and the removal of the sand are time consuming and costly. An alternative NDE technique is desirable which requires no pre-cleaning of the blade and a quick go/no-go inspection with the capability of estimating the crack length. This paper presents an innovative eddy current technique which meets the desired objectives by incorporating the use of specially designed contoured scanners equipped with an array of pancake coils. A set of eddy current pancake coils housed in three different scanners is used to manually scan and inspect the convex side of the stationary blade rings. The pancake coils are operated in a transmit/receive mode using two separate eddy current instruments. This paper presents the inspection concept, including scanner and probe designs, and test results from the various stages of multiple blade rings

  18. Remotely controlled inspection and handling systems for decommissioning tasks in nuclear facilities

    International Nuclear Information System (INIS)

    Schreck, G.; Bach, W.; Haferkamp, H.

    1993-01-01

    The Institut fur Werkstoffkunde at the University of Hanover has recently developed three remotely controlled systems for different underwater inspection and dismantling tasks. ODIN I is a tool guiding device, particularly being designed for the dismantling of the steam dryer housing of the KRB A power plant at Gundremmingen, Germany. After being approved by the licencing organization TUEV Bayern, hot operation started in November 1992. The seven axes remotely controlled handling system ZEUS, consisting of a three translatory axes guiding machine and a tool handling device with four rotatory axes, has been developed for the demonstration of underwater plasma arc cutting of spherical metallic components with great wall thicknesses. A specially designed twin sensor system and a modular torch, exchanged by means of a remote controlled tool changing device, will be used for different complex cutting tasks. FAUST, an autonomous, freediving underwater vehicle, was designed for complex inspection, maintenance and dismantling tasks. It is equipped with two video cameras, an ultrasonic and a radiologic sensor and a small plasma torch. A gripper and a subsidiary vehicle for inspection may be attached. (author)

  19. 76 FR 52996 - Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim...

    Science.gov (United States)

    2011-08-24

    ... Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim Program of Inspection Related to Audits of Brokers and Dealers August 18, 2011. I. Introduction On June 21, 2011, the Public... that would be imposed on different categories of registered public accounting firms and classes of...

  20. 78 FR 58269 - Notice of Request for Approval of an Information Collection; National Animal Health Monitoring...

    Science.gov (United States)

    2013-09-23

    ...In accordance with the Paperwork Reduction Act of 1995, this notice announces the Animal and Plant Health Inspection Service's intention to request approval of a new information collection for the National Animal Health Monitoring System's Bison 2014 Study to support the bison industry of the United States.

  1. 78 FR 24153 - Notice of Emergency Approval of an Information Collection; National Animal Health Monitoring...

    Science.gov (United States)

    2013-04-24

    ...In accordance with the Paperwork Reduction Act of 1995, this notice announces that the Animal and Plant Health Inspection Service has requested and received emergency approval of an information collection for a National Animal Health Monitoring System Equine Herpesvirus Myeloencephalopathy Study to support the equine industry in the United States.

  2. Regulatory inspection practices for industrial safety (electrical, mechanical, material handling and conventional aspects)

    International Nuclear Information System (INIS)

    Agarwal, K.

    2017-01-01

    Regulatory Inspection (RI) of BARC facilities and projects are carried out under the guidance of BARC Safety Council (BSC) Secretariat. Basically facilities and projects have been divided into two board categories viz. radiological facilities and non-radiological facilities. The Rls of radiological facilities should be carried out under OPSRC and of non-radiological facilities under CFSRC. Periodicity of inspection shall be at least once in a year. The RI of projects is carried out under concerned DSRC. RI practices with industrial safety which includes electrical, mechanical, material handling and conventional aspect for these facilities starts with check lists. The inspection areas are prepared in the form of checklists which includes availability of approved documents, compliance status of previous RIT and various safety committee's recommendations, radiological status of facilities, prompt reporting of safety related unusual occurrences, major incident, site visit for verification of actual status of system/plant. The practices for inspection in the area of electrical safety shall include checking of maintenance procedure for all critical class IV system equipment's such as HT panel, LT panel, transformer and motors. Load testing of Class III system such as D.G. set etc. shall be carried out as technical specification surveillance schedule. Status of aviation lights, number of qualified staff, availability of qualified staff etc. shall be form of inspection

  3. Inspecting Sizewell B Class 1 and IoF components

    International Nuclear Information System (INIS)

    McNulty, T.

    1990-01-01

    Class 1 and ''incredibility of failure'' (IoF) pre-service inspections for Sizewell B cover steam generator and pressurizer welds and nozzles, welds on the emergency boration system, accumulators and reactor coolant loop, and the whole of the Class 1 piping. The contractor for this work has recently been selected. The scope of the work and the techniques and equipment to be used are outlined. (author)

  4. 78 FR 58268 - Notice of Request for Approval of an Information Collection; National Animal Health Monitoring...

    Science.gov (United States)

    2013-09-23

    ...In accordance with the Paperwork Reduction Act of 1995, this notice announces the Animal and Plant Health Inspection Service's intention to request approval of a new information collection for the National Animal Health Monitoring System's Cervid 2014 Study to support the farmed cervid industry in the United States.

  5. 8 x 8 fuel surveillance program at Monticello site - end of Cycle 6: fourth post-irradiation inspection, October 1978

    International Nuclear Information System (INIS)

    Skarshaug, N.H.

    1980-09-01

    A fuel surveillance program for a lead 8 x 8 reload fuel assembly was implemented at the Monticello Nuclear Power Station in May 1974 prior to Reactor Cycle 3. Inspection results of the fourth post-irradiation inspection performed on this surveillance fuel assembly in October 1978 at EOC 6, after a bundle average exposure of 25,900 MWd/MT, are presented. The measurement techniques, results obtained and comparisons to previous measurements are discussed. The bundle and individual rods examined exhibited characteristics of normal operation and were approved for continued irradiation during Monticello operating Cycle 7

  6. Ultrasonic inspection

    International Nuclear Information System (INIS)

    Satittada, Gannaga

    1984-01-01

    Ultrasonic inspection is one of the most widely used methods for nondestructive inspection. The beam of high-frequency sound wave, ultrasonic wave, is introduced into the material. It travels through the material with some attendant loss of energy and can be reflected at interfaces. The reflected beam is detected and analyzed. Ultrasonic inspection is used to detect flaws in metal parts as well as in welded, brazed and bonded joints during research work and developing production and service. It is also used to detect and locate porosity, pipe, and flakes. In addition, it can be used for the measurement of metal thickness. Ultrasonic inspection is therefore used for quality control and material inspection in all major industries

  7. SmartInspect: Smart Contract Inspection Technical Report

    OpenAIRE

    Bragagnolo , Santiago; Rocha , Henrique ,; Denker , Marcus; Ducasse , Stéphane

    2017-01-01

    Smart contracts are embedded procedures stored with the data they act upon. Debugging deployed Smart Contracts is a difficult task since once deployed, the code cannot be reexecuted and inspecting a simple attribute is not easily possible because data is encoded. In this technical report, we present SmartInspect to address the lack of inspectability of a deployed contract. Our solution analyses the contract state by using decompilation techniques and a mirror-based architecture to represent t...

  8. 78 FR 4121 - Notice of Request for Revision to and Extension of Approval of an Information Collection; Cut...

    Science.gov (United States)

    2013-01-18

    ... and extension of approval of an information collection. Abstract: The Plant Protection Act (PPA, 7 U.S... flowers, nurseries, registered production sites, and the national plant protection organizations of... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0111...

  9. Modestly increased use of colonoscopy when copayments are waived.

    Science.gov (United States)

    Khatami, Shabnam; Xuan, Lei; Roman, Rolando; Zhang, Song; McConnel, Charles; Halm, Ethan A; Gupta, Samir

    2012-07-01

    Colorectal cancer (CRC) screening with colonoscopy often requires expensive copayments from patients. The 2010 Patient Protection and Affordable Care Act mandated elimination of copayments for CRC screening, including colonoscopy, but little is known about the effects of copayment elimination on use. The University of Texas employee, retiree, and dependent health plan instituted and promoted a waiver of copayments for screening colonoscopies in fiscal year (FY) 2009; we examined the effects of removing cost sharing on colonoscopy use. We conducted a retrospective cohort study of 59,855 beneficiaries of the University of Texas employee, retiree, and dependent health plan, associated with 16 University of Texas health and nonhealth campuses, ages 50-64 years at any point in FYs 2002-2009 (267,191 person-years of follow-up evaluation). The primary outcome was colonoscopy incidence among individuals with no prior colonoscopy. We compared the age- and sex-standardized incidence ratios for colonoscopy in FY 2009 (after the copayment waiver) with the expected incidence for FY 2009, based on secular trends from years before the waiver. The annual incidence of colonoscopy increased to 9.5% after the copayment was waived, compared with an expected incidence of 8.0% (standardized incidence ratio, 1.18; 95% confidence interval, 1.14-1.23; P screening results in a statistically significant, but modest (1.5%), increase in use. Additional strategies beyond removing financial disincentives are needed to increase use of CRC screening. Copyright © 2012 AGA Institute. Published by Elsevier Inc. All rights reserved.

  10. A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Zhai, Qingqing; Zhao, Yu

    2016-01-01

    We propose an inspection and replacement policy for a single component system that successively executes missions with random durations. The failure process of the system can be divided into two states, namely, normal and defective, following the delay time concept. Inspections are carried out periodically and immediately after the completion of each mission (random inspections). The failed state is always identified immediately, whereas the defective state can only be revealed by an inspection. If the system fails or is defective at a periodic inspection, then replacement is immediate. If, however, the system is defective at a random inspection, then replacement will be postponed if the time to the subsequent periodic inspection is shorter than a pre-determined threshold, and immediate otherwise. We derive the long run expected cost per unit time and then investigate the optimal periodic inspection interval and postponement threshold. A numerical example is presented to demonstrate the applicability of the proposed maintenance policy. - Highlights: • A delay time model of inspection is introduced for mission-based systems. • Periodic and random inspections are performed to check the state. • Replacement of the defective system at a random inspection can be postponed.

  11. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2011

    International Nuclear Information System (INIS)

    2010-07-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including: inspection planning, the training of inspectors, the conduct of inspections as well as inspection follow up and review. The report also provides an overview of the main features of the quality system

  12. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2013

    International Nuclear Information System (INIS)

    2013-04-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including inspection planning, the training of inspectors, the conduct of inspections as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  13. 76 FR 37055 - Notice of Request for Extension of Approval of an Information Collection; Importation of Baby...

    Science.gov (United States)

    2011-06-24

    ...] Notice of Request for Extension of Approval of an Information Collection; Importation of Baby Squash and Baby Courgettes From Zambia AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension... importation of baby squash and baby courgettes from Zambia. DATES: We will consider all comments that we...

  14. 78 FR 61323 - Notice of Request for Extension of Approval of an Information Collection; Importation of Tomatoes...

    Science.gov (United States)

    2013-10-03

    ...: Extension of approval of an information collection. Abstract: Under the Plant Protection Act (PPA, 7 U.S.C..., and exporters of tomatoes with stems from the Republic of Korea; the national plant protection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0084...

  15. 78 FR 58991 - Notice of Request for Extension of Approval of an Information Collection; Importation of Fresh...

    Science.gov (United States)

    2013-09-25

    ...: Extension of approval of an information collection. Abstract: The Plant Protection Act (PPA, 7 U.S.C. 7701... fresh pomegranates from Chile, and the national plant protection organization of Chile. Estimated annual... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0082...

  16. 76 FR 13970 - Notice of Request for Extension of Approval of an Information Collection; Black Stem Rust...

    Science.gov (United States)

    2011-03-15

    ... Requirements for Addition of Rust-Resistant Varieties AGENCY: Animal and Plant Health Inspection Service, USDA... Rust-Resistant Varieties. OMB Number: 0579-0186. Type of Request: Extension of approval of an... products to prevent the introduction of plant pests into the United States or their dissemination within...

  17. Inspection vehicle

    International Nuclear Information System (INIS)

    Takahashi, Masaki; Omote, Tatsuyuki; Yoneya, Yutaka; Tanaka, Keiji; Waki, Tetsuro; Yoshida, Tomiji; Kido, Tsuyoshi.

    1993-01-01

    An inspection vehicle comprises a small-sized battery directly connected with a power motor or a direct power source from trolly lines and a switching circuit operated by external signals. The switch judges advance or retreat by two kinds of signals and the inspection vehicle is recovered by self-running. In order to recover the abnormally stopped inspection vehicle to the targeted place, the inspection vehicle is made in a free-running state by using a clutch mechanism and is pushed by an other vehicle. (T.M.)

  18. 78 FR 58512 - Notice of Request for Extension of Approval of an Information Collection; Swine Health

    Science.gov (United States)

    2013-09-24

    ... respondent increased because more swine are being moved due to changes in production practices and..., a Permit to Move Restricted Animals (VS Form 1-27), a certificate of veterinary inspection (CVI), an... moved to slaughter in a means of conveyance sealed with an official seal. Since the last approval of...

  19. Automatic inspection for remotely manufactured fuel elements

    International Nuclear Information System (INIS)

    Reifman, J.; Vitela, J.E.; Gibbs, K.S.; Benedict, R.W.

    1995-01-01

    Two classification techniques, standard control charts and artificial neural networks, are studied as a means for automating the visual inspection of the welding of end plugs onto the top of remotely manufactured reprocessed nuclear fuel element jackets. Classificatory data are obtained through measurements performed on pre- and post-weld images captured with a remote camera and processed by an off-the-shelf vision system. The two classification methods are applied in the classification of 167 dummy stainless steel (HT9) fuel jackets yielding comparable results

  20. Vision based tunnel inspection using non-rigid registration

    Science.gov (United States)

    Badshah, Amir; Ullah, Shan; Shahzad, Danish

    2015-04-01

    Growing numbers of long tunnels across the globe has increased the need for safety measurements and inspections of tunnels in these days. To avoid serious damages, tunnel inspection is highly recommended at regular intervals of time to find any deformations or cracks at the right time. While following the stringent safety and tunnel accessibility standards, conventional geodetic surveying using techniques of civil engineering and other manual and mechanical methods are time consuming and results in troublesome of routine life. An automatic tunnel inspection by image processing techniques using non rigid registration has been proposed. There are many other image processing methods used for image registration purposes. Most of the processes are operation of images in its spatial domain like finding edges and corners by Harris edge detection method. These methods are quite time consuming and fail for some or other reasons like for blurred or images with noise. Due to use of image features directly by these methods in the process, are known by the group, correlation by image features. The other method is featureless correlation, in which the images are converted into its frequency domain and then correlated with each other. The shift in spatial domain is the same as in frequency domain, but the processing is order faster than in spatial domain. In the proposed method modified normalized phase correlation has been used to find any shift between two images. As pre pre-processing the tunnel images i.e. reference and template are divided into small patches. All these relative patches are registered by the proposed modified normalized phase correlation. By the application of the proposed algorithm we get the pixel movement of the images. And then these pixels shifts are converted to measuring units like mm, cm etc. After the complete process if there is any shift in the tunnel at described points are located.

  1. Inspection activities of the Mexican regulatory body during the construction stage of the first unit of Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Salgado Gonzalez, Julio Ricardo

    1996-01-01

    The paper addresses the regulatory framework established for the design, construction and operation of the NPP. The regulatory bases of the inspection program are mentioned.A summary of the inspection and reviewing activities carried out by the former Nuclear Safety Management Construction area during the construction stage, taking the year 1977 as the beginning of regular inspection activities for this construction stage, and up to the year 1987, when this one is considered as practically completed, and a stage of pre-operational tests has been started. Finally, the main inspection areas are described, and a summary is given of the classification of deficiencies detected during the inspections

  2. 78 FR 18425 - Proposed Information Collection VA Police Officer Pre-Employment Screening Checklist); Comment...

    Science.gov (United States)

    2013-03-26

    ... techniques or the use of other forms of information technology. Title: VA Police Officer Pre-Employment... Police Officer Pre-Employment Screening Checklist); Comment Request AGENCY: Office of Operations... approved collection. Abstract: VA personnel complete VA Form 0120 to document pre- employment history and...

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    International Nuclear Information System (INIS)

    2012-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-21

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  5. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

  6. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  7. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  8. 76 FR 81467 - Notice of Request for Extension of Approval of an Information Collection; Importation of Baby...

    Science.gov (United States)

    2011-12-28

    ...] Notice of Request for Extension of Approval of an Information Collection; Importation of Baby Corn and Baby Carrots From Zambia AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of... importation of baby corn and baby carrots from Zambia. DATES: We will consider all comments that we receive on...

  9. Capability evaluation of Eddy current and ultrasonic in-service inspections of steam generator tubes. A status report of PISC III Action 5

    International Nuclear Information System (INIS)

    Bieth, M.; Birac, C.; Comby, R.

    1998-01-01

    Document summarizes the PISC III (Programme for the Inspection of Steel Components) report No. 41, full description of the PISC III Action 5 on Steam Generator Tubes Inspection, containing all details and final conclusions which are still to be approved by the PISC III Management Board. The report was prepared by the reference laboratory of PISC under guidance and with continuous contribution of the members of the Data Analysis Group (DAG) of this PISC III. There were several procedures which demonstrated good detection capability of major flaws in typical locations of the steam generator. Conclusions of the exercise indicate that capability demonstration is necessary to qualify in service inspection procedures for steam generator tubes

  10. Pre-Shipment Preparations at the Savannah River Site

    International Nuclear Information System (INIS)

    Thomas, J.E.

    2000-01-01

    This paper will provide a detailed description of each of the pre-shipment process steps WSRC performs to produce the technical basis for approving the receipt and storage of spent nuclear fuel at the Savannah River Site. It is intended to be a guide to reactor operators who plan on returning ''U.S. origin'' SNF and to emphasize the need for accurate and timely completion of pre-shipment activities

  11. Automated visual inspection of brake shoe wear

    Science.gov (United States)

    Lu, Shengfang; Liu, Zhen; Nan, Guo; Zhang, Guangjun

    2015-10-01

    With the rapid development of high-speed railway, the automated fault inspection is necessary to ensure train's operation safety. Visual technology is paid more attention in trouble detection and maintenance. For a linear CCD camera, Image alignment is the first step in fault detection. To increase the speed of image processing, an improved scale invariant feature transform (SIFT) method is presented. The image is divided into multiple levels of different resolution. Then, we do not stop to extract the feature from the lowest resolution to the highest level until we get sufficient SIFT key points. At that level, the image is registered and aligned quickly. In the stage of inspection, we devote our efforts to finding the trouble of brake shoe, which is one of the key components in brake system on electrical multiple units train (EMU). Its pre-warning on wear limitation is very important in fault detection. In this paper, we propose an automatic inspection approach to detect the fault of brake shoe. Firstly, we use multi-resolution pyramid template matching technology to fast locate the brake shoe. Then, we employ Hough transform to detect the circles of bolts in brake region. Due to the rigid characteristic of structure, we can identify whether the brake shoe has a fault. The experiments demonstrate that the way we propose has a good performance, and can meet the need of practical applications.

  12. 75 FR 44288 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Science.gov (United States)

    2010-07-28

    ...] Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Overhead and Gantry Cranes (29 CFR 1910.179). DATES: Comments must be... requirements for: Marking the rated load of cranes; preparing certification records to verify the inspection of...

  13. Pharmacovigilance of biologicals : dynamics in post-approval safety learning

    NARCIS (Netherlands)

    Vermeer, N.S.

    2015-01-01

    Regulatory decisions to allow new drugs on the market by definition have to accept a certain level of uncertainty about the full benefit-risk balance. Pre-approval studies typically provide information on a limited number of patients over a relative short follow-up period, and handle strict

  14. Shell Inspection History and Current CMM Inspection Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-26

    The following report provides a review of past and current CMM Shell Inspection efforts. Calibration of the Sheffield rotary contour gauge has expired and the primary inspector, Matthew Naranjo, has retired. Efforts within the Inspection team are transitioning from maintaining and training new inspectors on Sheffield to off-the-shelf CMM technology. Although inspection of a shell has many requirements, the scope of the data presented in this report focuses on the inner contour, outer contour, radial wall thickness and mass comparisons.

  15. Randomization of inspections

    International Nuclear Information System (INIS)

    Markin, J.T.

    1989-01-01

    As the numbers and complexity of nuclear facilities increase, limitations on resources for international safeguards may restrict attainment of safeguards goals. One option for improving the efficiency of limited resources is to expand the current inspection regime to include random allocation of the amount and frequency of inspection effort to material strata or to facilities. This paper identifies the changes in safeguards policy, administrative procedures, and operational procedures that would be necessary to accommodate randomized inspections and identifies those situations where randomization can improve inspection efficiency and those situations where the current nonrandom inspections should be maintained. 9 refs., 1 tab

  16. Inspection of internal tank welds using the ACFM inspection method

    International Nuclear Information System (INIS)

    Topp, D.A.; Lugg, M.C.

    2009-01-01

    The paper describes recent developments of the ACFM technique and describes several case studies where ACFM has been used to inspect the internal plate welds on large steel storage tanks in refineries. For weld inspection, conventional methods such as magnetic particle inspection or vacuum box testing are generally used. This paper presents comparisons of the results from ACFM with those from the conventional methods, from which conclusions are drawn as to the benefits this technique offers in terms of cost, time savings and inspection reliability. (author)

  17. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2012

    International Nuclear Information System (INIS)

    2012-04-01

    The purpose of this document is to promote transparency in the activities of the RPII. It explains aspects of the internal workings of the Regulation and Information Management Division of the Institute to aid understanding of the processes and decisions of that Division which may impact on licensees and other interested parties. The objective of the report is to provide an overview of inspection activities of the RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including; inspection planning, the training of inspectors, the conduct of inspections, as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  18. Technology Assessment of the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Woodley, Anthony

    1998-01-01

    ...) Challenge Inspections. The CWC is an intrusive inspection. The Challenge Inspection allows for a team of international inspectors to inspect on very short notice a naval facility suspected of violating the CWC...

  19. Process Improvement to the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Triplett, William

    1997-01-01

    ...) Challenge Inspection. The CWC is an intensive inspection. The Challenge Inspection allows for a team of international inspectors to inspect a naval facility suspected of violating the CWC on very short notice...

  20. Design of a pre-collimator system for neutronics benchmark experiment

    International Nuclear Information System (INIS)

    Cai Xinggang; Liu Jiantao; Nie Yangbo; Bao Jie; Ruan Xichao; Lu Yanxia

    2013-01-01

    Benchmark experiment is an important means to inspect the reliability and accuracy of the evaluated nuclear data, the effect/background ratios are the important parameters to weight the quality of experimental data. In order to obtain higher effect/background ratios, a pre-collimator system was designed for benchmark experiment. This system mainly consists of a pre-collimator and a shadow cone, The MCNP-4C code was used to simulate the background spectra under various conditions, from the results we found that with the pre-collimator system have a very marked improvement in the effect/background ratios. (authors)

  1. General inspection strategy for fault diagnosis-minimizing the inspection costs

    International Nuclear Information System (INIS)

    Reinertsen, Rune; Wang Xiaozhong

    1995-01-01

    In this paper, a general inspection strategy for system fault diagnosis is presented. The procedure presented in this paper, is an improvement of methods described in papers by , and . This general strategy provides the optimal inspection procedure when the inspections require unequal effort and the minimum cut set probabilities are unequal. This feature makes the procedure described in this paper more useful for practical applications than the most recent procedure presented in the paper by Najmus-Saqib and Ishaque, which requires the minimum cut set probabilities to be equal. The inspection strategy described in this paper is based on first inspecting the basic event that will provide the maximum information gain per unit cost invested. The information gain is measured by the decrease of Shannon entropy. A detailed tutorial example is presented

  2. Cargo container inspection test program at ARPA's Nonintrusive Inspection Technology Testbed

    Science.gov (United States)

    Volberding, Roy W.; Khan, Siraj M.

    1994-10-01

    An x-ray-based cargo inspection system test program is being conducted at the Advanced Research Project Agency (ARPA)-sponsored Nonintrusive Inspection Technology Testbed (NITT) located in the Port of Tacoma, Washington. The test program seeks to determine the performance that can be expected from a dual, high-energy x-ray cargo inspection system when inspecting ISO cargo containers. This paper describes an intensive, three-month, system test involving two independent test groups, one representing the criminal smuggling element and the other representing the law enforcement community. The first group, the `Red Team', prepares ISO containers for inspection at an off-site facility. An algorithm randomly selects and indicates the positions and preparation of cargoes within a container. The prepared container is dispatched to the NITT for inspection by the `Blue Team'. After in-gate processing, it is queued for examination. The Blue Team inspects the container and decides whether or not to pass the container. The shipment undergoes out-gate processing and returns to the Red Team. The results of the inspection are recorded for subsequent analysis. The test process, including its governing protocol, the cargoes, container preparation, the examination and results available at the time of submission are presented.

  3. Inspection Database

    Data.gov (United States)

    U.S. Department of Health & Human Services — FDA is disclosing the final inspection classification for inspections related to currently marketed FDA-regulated products. The disclosure of this information is not...

  4. Optical fiber inspection system

    Science.gov (United States)

    Moore, Francis W.

    1987-01-01

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

  5. Regulatory inspection of the egyptian gamma irradiator using a proposed inspection checklist

    International Nuclear Information System (INIS)

    Abdel-Ghani, A.H.

    2000-01-01

    Regulatory inspections are one of the most important elements of a regulatory programme. It shall be performed in all areas of the regulatory responsibility and during all phases of siting, design, construction, commissioning, operation, maintenance and decommissioning of an irradiator facility. The egyptian mega gamma irradiator operating since december 1979 has a Co-60 source of about 400 kilo curies and is used mainly for sterilization of medical supplies and pharmaceuticals and for preservation of some food stuffs. The constructor (Nordion international Inc.) recommended an extensive inspection programme. In accordance with the international and national (2.3) regulations as well as the licensing conditions, the competent authority (NCNSRC) shall perform regulatory inspections both announced and unannounced. In order to facilitate the inspection task and to harmonize the inspection reports a checklist for inspection is proposed which can be used also as an inspection report form

  6. 46 CFR 153.488 - Design and equipment for tanks carrying high melting point NLSs: Category B.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS... equipment for tanks carrying high melting point NLSs: Category B. Unless waived under § 153.491, for a ship to have its Certificate of Inspection or Certificate of Compliance endorsed allowing a tank to carry...

  7. 78 FR 54861 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report

    Science.gov (United States)

    2013-09-06

    ... No. FMCSA-2012-0336] RIN 2126-AB46 Inspection, Repair, and Maintenance; Driver-Vehicle Inspection... Federal Register of August 7, 2013, regarding driver vehicle inspection reports. The corrections involve..., Vehicle and Roadside Operations Division, Office of Bus and Truck Standards and Operations, Federal Motor...

  8. Additive Manufacturing Infrared Inspection

    Science.gov (United States)

    Gaddy, Darrell; Nettles, Mindy

    2015-01-01

    The Additive Manufacturing Infrared Inspection Task started the development of a real-time dimensional inspection technique and digital quality record for the additive manufacturing process using infrared camera imaging and processing techniques. This project will benefit additive manufacturing by providing real-time inspection of internal geometry that is not currently possible and reduce the time and cost of additive manufactured parts with automated real-time dimensional inspections which deletes post-production inspections.

  9. Health products inspection

    International Nuclear Information System (INIS)

    Stoltz, M.

    2009-01-01

    To protect public health, the Health Products Inspection is a public service mission where the application of regulations concerning activities on human health products and cosmetic products is verified. This mission permits a global approach to assess the health products risk-based benefit and, in monitoring by laboratory testing and by on site inspections, to verify their compliance with appropriate regulations. The seventy five inspectors perform about eight hundred inspections per year, in France and abroad. These inspections are related to data provided in the health products assessment and also to manufacturing and delivery practices. The French inspection body is also involved in the training of foreign inspectors and in the harmonization of national, European and international practices either for operators than for the competent authorities. (author)

  10. Interpatient variation in normal peripheral zone apparent diffusion coefficient: effect on the prediction of prostate cancer aggressiveness

    NARCIS (Netherlands)

    Litjens, G.J.S.; Hambrock, T.; Hulsbergen-van de Kaa, C.A.; Barentsz, J.O.; Huisman, H.J.

    2012-01-01

    Purpose: To determine the interpatient variability of prostate peripheral zone (PZ) apparent diffusion coefficient (ADC) and its effect on the assessment of prostate cancer aggressiveness. Materials and Methods: The requirement for institutional review board approval was waived. Intra- and

  11. Biowaiver Monographs for Immediate Release Solid Oral Dosage Forms: Proguanil Hydrochloride.

    NARCIS (Netherlands)

    Plöger, Gerlinde F; Abrahamsson, Bertil; Cristofoletti, Rodrigo; Groot, D I R K W; Langguth, Peter; Mehta, Mehul U; Parr, Alan; Polli, James E; Shah, Vinod P; Tajiri, Tomokazu; Dressman, Jennifer B

    2018-01-01

    Literature data relevant to the decision to waive in vivo bioequivalence testing for the approval of generic immediate release solid oral dosage forms of proguanil hydrochloride are reviewed. To clarify the Biopharmaceutics Classification System (BCS) classification, experimental solubility and

  12. Application of wireless LAN technology to remote monitoring for inspection equipment

    International Nuclear Information System (INIS)

    Ishiyama, Koichi; Kimura, Takashi; Miura, Yasushi; Yamaguchi, Katsuhiro; Kabuki, Toshihide

    2011-01-01

    To support inspections under an Integrated Safeguards regime into Tokai Reprocessing Plant (TRP), the IAEA suggested making use of Remote Monitoring (RM) capabilities to the inspection equipment (surveillance camera and NDA systems) installed in the spent fuel storage area at TRP. Since TRP had no pre-prepared cabling infrastructure for data transmission in the spent fuel storage area, the option of wireless LAN was chosen over the telephone line due to its lower installation costs. Feasibility studies and tests were performed by TRP on communication and particularly on long-term continuous communication using wireless LAN equipment composed of APs (AP: Access Point) and the external antennas for introducing wireless LAN technology to RM. As a result it was recognized that wireless LAN has enough ability to communicate for long periods of time and consequently the IAEA installed the AP and the external antenna to each inspection equipment and the wireless LAN technology was applied for RM. In this paper, the summary of each test and the results are reported. (author)

  13. 78 FR 1759 - Notice of Approval of Clean Air Act Outer Continental Shelf Minor Source/Title V Minor Permit...

    Science.gov (United States)

    2013-01-09

    ... documents relevant to the above-referenced permits are available for public inspection during normal... permit decisions, to the extent it is available, may be sought by filing a petition for review in the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR PART 52 [FRL-9767-5] Notice of Approval of Clean Air Act...

  14. Information-Driven Inspections

    International Nuclear Information System (INIS)

    Laughter, Mark D.; Whitaker, J. Michael; Lockwood, Dunbar

    2010-01-01

    New uranium enrichment capacity is being built worldwide in response to perceived shortfalls in future supply. To meet increasing safeguards responsibilities with limited resources, the nonproliferation community is exploring next-generation concepts to increase the effectiveness and efficiency of safeguards, such as advanced technologies to enable unattended monitoring of nuclear material. These include attribute measurement technologies, data authentication tools, and transmission and security methods. However, there are several conceptual issues with how such data would be used to improve the ability of a safeguards inspectorate such as the International Atomic Energy Agency (IAEA) to reach better safeguards conclusions regarding the activities of a State. The IAEA is pursuing the implementation of information-driven safeguards, whereby all available sources of information are used to make the application of safeguards more effective and efficient. Data from continuous, unattended monitoring systems can be used to optimize on-site inspection scheduling and activities at declared facilities, resulting in fewer, better inspections. Such information-driven inspections are the logical evolution of inspection planning - making use of all available information to enhance scheduled and randomized inspections. Data collection and analysis approaches for unattended monitoring systems can be designed to protect sensitive information while enabling information-driven inspections. A number of such inspections within a predetermined range could reduce inspection frequency while providing an equal or greater level of deterrence against illicit activity, all while meeting operator and technology holder requirements and reducing inspector and operator burden. Three options for using unattended monitoring data to determine an information-driven inspection schedule are to (1) send all unattended monitoring data off-site, which will require advances in data analysis techniques to

  15. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  16. In-Service Inspection system for coolant channels of Indian PHWRS - evolution and experience

    International Nuclear Information System (INIS)

    Puri, R.K.; Singh, M.

    2006-01-01

    In-Service Inspection (ISI) is the most important of all periodic monitoring and surveillance activities for assuring the structural integrity of coolant channels in the life extension and management of pressurized heavy water reactors (PHWR-CANDU). Indian PHWRs (220 MWe) are characterized by consists by 306 coolant channels in each unit. These channels have to be inspected for various parameters over the operating life of the reactor. ISI of coolant channels necessitated the indigenous development of an inspection system called BARCIS (BARC Channel Inspection System) at Bhabha Atomic Research Center. BARCIS consists of mainly three parts; drive and control unit, special sealing plug and an inspection head carrying various NDT sensors. Five such systems have been built and deployed at various power plants. The paper deals with the development of the BARCIS system for meeting the ISI requirements of coolant channels, development cycle of this system from its conception to evolution to the present state, challenges, data generated and experience gained (ISI of nearly 900 coolant channels has been completed). Prior to BARCIS, pressure tube gauging equipment for pre-service inspection of coolant tubes was developed in 1980. Moreover a tool for ISI of coolant channels in dry condition was developed in 1990. The paper also describes evolution of various contingency procedures and devices developed over the last one decade. Future plans taking into account technological advancement, changes in the scope of inspection due to design and operating experiences and plant layout will also be covered. The paper describes the efforts put in to develop drive and control mechanism to suit the different vault layouts. The drive mechanism is responsible for linear and rotary movement of the inspection head to carry out 100% volumetric inspection. Special emphasis has been laid on the safety devices required during the inspection activity. Special measures for heavy water retention in

  17. 25 CFR 30.111 - When should the tribal governing body or school board request technical assistance?

    Science.gov (United States)

    2010-04-01

    ... maximize the time the tribal governing body or school board has to develop an alternative definition of AYP... should request technical assistance before formally notifying the Secretary of its intention to waive the Secretary's definition of AYP. Approval of Alternative Definition ...

  18. Fuel inspection device

    International Nuclear Information System (INIS)

    Tsuji, Tadashi.

    1990-01-01

    The fuel inspection device of the present invention has a feature of obtaining an optimum illumination upon fuel rod interval inspection operation in a fuel pool. That is, an illumination main body used underwater is connected to a cable which is led out on a floor. A light control device is attached to the other end of the cable and an electric power cable is connected to the light control device. A light source (for example, incandescent lamp) is incorporated in the casing of the illumination main body, and a diffusion plate is disposed at the front to provide a plane light source. The light control device has a light control knob capable of remote-controlling the brightness of the light of the illumination main body. In the fuel inspection device thus constituted, halation is scarcely caused on the image screen upon inspection of fuels by a submerged type television camera to facilitate control upon inspection. Accordingly, efficiency of the fuel inspection can be improved to shorten the operation time. (I.S.)

  19. Inspection of training activities by the NRC's Office of Inspection and Enforcement

    International Nuclear Information System (INIS)

    Ruhlman, W.A.

    1975-01-01

    New requirements in the Code of Federal Regulations, the issuance of new Regulatory Guides and ANSI Standards, have indicated the increased emphasis being placed on training by forces in the Nuclear Industry and the Nuclear Regulatory Commission. A brief description is presented of the functions of the Office of Inspection and Enforcement in the training areas. Three areas are examined: general inspection techniques; training inspection scope; and training inspection bases

  20. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  1. Ultra-low field MRI food inspection system prototype

    Energy Technology Data Exchange (ETDEWEB)

    Kawagoe, Satoshi, E-mail: s133413@edu.tut.ac.jp; Toyota, Hirotomo; Hatta, Junichi; Ariyoshi, Seiichiro; Tanaka, Saburo, E-mail: tanakas@ens.tut.ac.jp

    2016-11-15

    Highlights: • We have developed a ULF-MRI system using HTS-SQUID for food inspection. • We developed a compact magnetically shielded box to attenuate environmental noise. • The 2D-MR image was reconstructed from the grid processing data using 2D-FFT method. • The 2D-MR images of a disk-shaped and a multiple cell water sample were obtained. • The results showed the possibility of applying the ULF-MRI system to food inspection. - Abstract: We develop an ultra-low field (ULF) magnetic resonance imaging (MRI) system using a high-temperature superconducting quantum interference device (HTS-SQUID) for food inspection. A two-dimensional (2D)-MR image is reconstructed from the grid processing raw data using the 2D fast Fourier transform method. In a previous study, we combined an LC resonator with the ULF-MRI system to improve the detection area of the HTS-SQUID. The sensitivity was improved, but since the experiments were performed in a semi-open magnetically shielded room (MSR), external noise was a problem. In this study, we develop a compact magnetically shielded box (CMSB), which has a small open window for transfer of a pre-polarized sample. Experiments were performed in the CMSB and 2D-MR images were compared with images taken in the semi-open MSR. A clear image of a disk-shaped water sample is obtained, with an outer dimension closer to that of the real sample than in the image taken in the semi-open MSR. Furthermore, the 2D-MR image of a multiple cell water sample is clearly reconstructed. These results show the applicability of the ULF-MRI system in food inspection.

  2. The PISC programme on defective steam generator tubes inspection summary report

    International Nuclear Information System (INIS)

    Birac, C.; Comby, R.; Maciga, G.; Zanella, G.; Perez Prat, J.; Estorff, U. von

    1995-01-01

    The PISC III Actions are intended to extend the results and methodologies of the previous PISC exercises, i.e. the validation of the capabilities of the various examination techniques when used on real defects in real components under realistic conditions of inspection. The objective of this action is relatively close to that of the heavy structures programmes: the experimental evaluation of the performance of test procedures used for steam generator tubes in nuclear power plants during in-service or pre-service inspections. The exercise is a capability exercise consisting of Round Robin Tests on individual tubes including calibration, training and blind test tubes. In this paper the main conclusions from the RRT conducted in the framework of Action 5 will be presented and discussed. (author). 7 refs, 4 figs, 2 tabs

  3. Technical regulation of nondestructive inspection

    International Nuclear Information System (INIS)

    1995-01-01

    It starts with the explanation of definition of nondestructive inspection and qualifications for a inspection. It lists the technical regulations of nondestructive inspections which are radiographic testing, ultrasonic flaw detecting test, liquid penetrant test, magnetic particle inspection, eddy current test visual inspection and leakage test.

  4. 48 CFR 809.106-1 - Conditions for pre-award surveys.

    Science.gov (United States)

    2010-10-01

    ... service or using service chiefs or designees appointed by the facility or VISN director will conduct a pre... for contracts covering the products and services of the following: (1) Bakeries. (2) Dairies. (3) Ice cream plants. (4) Laundry and dry cleaning activities. (b) Before any inspection, the contracting...

  5. Damage-tolerant design and inspection philosophy for nuclear and other pressure vessels

    International Nuclear Information System (INIS)

    Adams, N.J.I.

    1980-01-01

    Statistical analyses of pressure vessel failure rates indicate that, to date, the record is very good. However, the public hazard and environmental consequences of failure in certain industrial processes now give cause for much greater concern. With the exception of an Appendix in ASME III, the current design codes and requirements for new vessels are all based on the assumption that they are free from cracklike defects, but engineers recognize tht such perfect vessels cannot be manufactured. Taking into account failure mechanisms, material properties, pre- and in-service inspection, proof testing, failure statistics and probabilistic methods, views are put forward on how a damage-tolerant design and inspection philosophy may be developed to reduce further the possibility of ''rogue'' vessel failure. 21 refs

  6. Benchmarking on Inspection Practices. First Triennial Report of the Working Group on Inspection Practices

    International Nuclear Information System (INIS)

    2017-01-01

    The WGIP Nuclear Power Plant (NPP) Observed Inspection Practices Program is intended to promote co-operation and learning among member countries and to collect and provide them with information for improving the effectiveness of existing regulatory inspection practices. This is accomplished by observing how inspections are carried out by other member countries and issuing a WGIP observed inspection report that includes observations (e.g. inspection techniques, obstacles encountered), lessons learnt and potential commendable practices that could be used by a regulatory body. This first triennial report documents the results of a consistency check performed between all six WGIP observed inspection reports and ratifies certain observations, lessons learnt and potential commendable practices identified by WGIP observed inspection participants

  7. An integrated approach for improving occupational health and safety management: the voluntary protection program in Taiwan.

    Science.gov (United States)

    Su, Teh-Sheng; Tsai, Way-Yi; Yu, Yi-Chun

    2005-05-01

    A voluntary compliance program for occupational health and safety management, Voluntary Protection Programs (VPP), was implemented with a strategy of cooperation and encouragement in Taiwan. Due to limitations on increasing the human forces of inspection, a regulatory-based guideline addressing the essence of Occupational Health and Safety Management Systems (OHSMS) was promulgated, which combined the resources of third parties and insurance providers to accredit a self-improving worksite with the benefits of waived general inspection and a merit contributing to insurance premium payment reduction. A designated institute accepts enterprise's applications, performs document review and organizes the onsite inspection. A final review committee of Council of Labor Affairs (CLA) confers a two-year certificate on an approved site. After ten years, the efforts have shown a dramatic reduction of occupational injuries and illness in the total number of 724 worksites granted certification. VPP worksites, in comparison with all industries, had 49% lower frequency rate in the past three years. The severity rate reduction was 80% in the same period. The characteristics of Taiwan VPP program and international occupational safety and health management programs are provided. A Plan-Do-Check-Act management cycle was employed for pursuing continual improvements to the culture fostered. The use of a quantitative measurement for assessing the performance of enterprises' occupational safety and health management showed the efficiency of the rating. The results demonstrate that an employer voluntary protection program is a promising strategy for a developing country.

  8. 45 CFR 400.300 - Waivers.

    Science.gov (United States)

    2010-10-01

    ... Regulations Relating to Public Welfare OFFICE OF REFUGEE RESETTLEMENT, ADMINISTRATION FOR CHILDREN AND... may waive such requirement with respect to such State, unless required by statute, if the Director... Federal refugee policy objectives. To the fullest extent practicable, the Director will approve or...

  9. Benchmarking EUV mask inspection beyond 0.25 NA

    International Nuclear Information System (INIS)

    Goldberg, Kenneth A.; Mochi, Iacopo; Anderson, Erik H.; Rekawa, Seno B.; Kemp, Charles D.; Huh, S.; Han, H.-S.; Naulleau, P.; Gunion, R.F.

    2008-01-01

    The SEMATECH Berkeley Actinic Inspection Tool (AIT) is an EUV-wavelength mask inspection microscope designed for direct aerial image measurements, and pre-commercial EUV mask research. Operating on a synchrotron bending magnet beamline, the AIT uses an off-axis Fresnel zoneplate lens to project a high-magnification EUV image directly onto a CCD camera. We present the results of recent system upgrades that have improved the imaging resolution, illumination uniformity, and partial coherence. Benchmarking tests show image contrast above 75% for 100-nm mask features, and significant improvements and across the full range of measured sizes. The zoneplate lens has been replaced by an array of user-selectable zoneplates with higher magnification and NA values up to 0.0875, emulating the spatial resolution of a 0.35-NA 4 x EUV stepper. Illumination uniformity is above 90% for mask areas 2-(micro)m-wide and smaller. An angle-scanning mirror reduces the high coherence of the synchrotron beamline light source giving measured σ values of approximately 0.125 at 0.0875 NA

  10. 18 CFR 385.404 - Depositions during proceedings (Rule 404).

    Science.gov (United States)

    2010-04-01

    ... signature is waived or that the deponent cannot or will not sign, accompanied by any reason given for a... deposition with a copy of the transcription. (2) Documents and things produced for inspection during the... to the deposition and the officer will certify the document or thing as the original offered during...

  11. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick; Petrello, Jaclyn

    2016-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  12. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alvarado, Juan; Matthews, Patrick

    2018-05-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: • CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. • CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. • CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. • CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.

  13. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States); Petrello, Jaclyn [Navarro, Las Vegas, NV (United States)

    2016-03-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  14. Part-time work as a pre-retirement measure

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at the Standing Concertation Committee at its meeting on 7 December 2006, the Director-General has approved the extension of the Part-time work scheme as a pre-retirement measure for the year 2007, i.e. until 31 December 2007. Human Resources Department Tel. 72808/74128

  15. Part-time work as a pre-retirement measure

    CERN Multimedia

    HR Department

    2007-01-01

    Following discussion at the Standing Concertation Committee at its meeting on 2 November 2007, the Director-General has approved the extension of the part-time work scheme as a pre-retirement measure for the year 2008, i.e. until 31 December 2008. Human Resources Department Tel. 74484/73903

  16. Port-of-entry safety via the reliability optimization of container inspection strategy through an evolutionary approach

    International Nuclear Information System (INIS)

    Ramirez-Marquez, Jose Emmanuel

    2008-01-01

    Up to now, of all the containers received in USA ports, roughly between 2% and 5% are scrutinized to determine if they could cause some type of danger or contain suspicious goods. Recently, concerns have been raised regarding the type of attack that could happen via container cargo leading to devastating economic, psychological and sociological effects. Overall, this paper is concerned with developing an inspection strategy that minimizes the total cost of inspection while maintaining a user-specified detection rate for 'suspicious' containers. In this respect, a general model for describing an inspection strategy is proposed. The strategy is regarded as an (n+1)-echelon decision tree where at each of these echelons, a decision has to be taken, regarding which sensor to be used, if at all. Second, based on the general decision-tree model, this paper presents a minimum cost container inspection strategy that conforms to a pre-specified user detection rate under the assumption that different sensors with different reliability and cost characteristics can be used. To generate an optimal inspection strategy, an evolutionary optimization approach known as probabilistic solution discovery algorithm has been used

  17. How Agencies Inspect. A Comparative Study of Inspection Policies in Eight Swedish Government Agencies

    International Nuclear Information System (INIS)

    Lindblom, Lars; Clausen, Jonas; Edvardsson, Karin; Hayenhielm, Madeleine; Hermansson, Helene; Nihlen, Jessica; Palm, Elin; Ruden, Christina; Wikman, Per; Hansson, Sven Ove

    2003-04-01

    Eight Swedish authorities with inspection tasks in the areas of health, safety, and environmental protection have been compared, namely the authorities responsible for nuclear safety, radiation protection, railway, marine and aviation safety, environmental protection, chemicals control, and health and safety on workplaces. Significant differences in inspection policies and practices between the authorities were found, such as: diverging definitions of supervision and inspection that complicate comparisons, different priority-setting principles for inspections, variations in inspection frequencies (between 13 and 0.03 inspections per company and year), different practices with respect to notifying companies before inspection visits, and in particular, large differences in the extent to which non-compliance with regulations is reported to legal authorities. It was concluded that these agencies have much to gain from increasing their cooperation in methods development, evaluation studies, and education of inspectors

  18. Incore inspection device

    International Nuclear Information System (INIS)

    Ogisu, Tatsuki; Taguchi, Kosei.

    1995-01-01

    The device of the present invention can inspect surfaces of equipments in reactor water in a nuclear reactor in a state of atmospheric air. Namely, an inspection device is movable forwardly and backwardly in a water-proof vessel. An annular sucker with pleats is disposed to the outer side of a lid of the water-proof vessel. A television camera for an under water monitoring is disposed to the inner side of the lid of the water-proof vessel by way of a partitioning wall with lid. Transferring screws are disposed at the back and on the side of the water-proof vessel. In the device having such a constitution, (1) the inside of the water-proof vessel is at first made water-tight by closing the partitioning wall with lid, (2) the back and the side screws are operated by the guide of the underwater monitoring television camera, to transfer the water-proof vessel to the surface of the reactor core to be inspected, (3) the annular sucker with pleats is urged on the surface to be inspected by the back screw, to fix the water-proof vessel, (4) reactor water in a space of the annular sucker with pleats is discharged and replaced with air, and (5) the lid of the partition wall with lid is opened and the inspection device is disposed at a position of the underwater monitoring television camera, to inspect the surface to be inspected in a state of atmospheric air. (I.S.)

  19. Pressurized water reactor inspection procedures

    International Nuclear Information System (INIS)

    Heinrich, D.; Mueller, G.; Otte, H.J.; Roth, W.

    1998-01-01

    Inspections of the reactor pressure vessels of pressurized water reactors (PWR) so far used to be carried out with different central mast manipulators. For technical reasons, parallel inspections of two manipulators alongside work on the refueling cavity, so as to reduce the time spent on the critical path in a revision outage, are not possible. Efforts made to minimize the inspection time required with one manipulator have been successful, but their effects are limited. Major reductions in inspection time can be achieved only if inspections are run with two manipulators in parallel. The decentralized manipulator built by GEC Alsthom Energie and so far emmployed in boiling water reactors in the USA, Spain, Switzerland and Japan allows two systems to be used in parallel, thus reducing the time required for standard inspection of a pressure vessel from some six days to three days. These savings of approximately three days are made possible without any compromises in terms of positioning by rail-bound systems. During inspection, the reactor refueling cavity is available for other revision work without any restrictions. The manipulator can be used equally well for inspecting standard PWR, PWR with a thermal shield, for inspecting the land between in-core instrumentation nozzles, BWR with and without jet pumps (complementary inspection), and for inspecting core support shrouds. (orig.) [de

  20. Invisible thread: pre-service success indicators among Marine general officers

    OpenAIRE

    Munoz, Valerie; Common, Joseph; Lue, Kendra

    2017-01-01

    Approved for public release; distribution is unlimited The purpose of this study is to identify commonalities that may exist among general officers within the Unites States Marine Corps. This exploratory analysis focuses on pre-service indicators of success and assesses the existence of any competitive advantages. The data used in this analysis includes pre- and post-accession information obtained from the United States Marine Corps' Total Force Data Warehouse (TFDW), as well as semi-struc...

  1. POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON POND FACILITY, NEVADA TEST SITE, NEVADA FOR CALENDAR YEAR 2005

    International Nuclear Information System (INIS)

    2006-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection (NDEP), 1995) and the Federal Facility Agreement and Consent Order of 1996. Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by the NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period. This report covers calendar year 2005. Quarterly site inspections were performed in March, June, September, and December of 2005. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Five additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in) within a 24-hour period during 2005. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Precipitation records for 2005 are included in Appendix C

  2. Study on Classification Accuracy Inspection of Land Cover Data Aided by Automatic Image Change Detection Technology

    Science.gov (United States)

    Xie, W.-J.; Zhang, L.; Chen, H.-P.; Zhou, J.; Mao, W.-J.

    2018-04-01

    The purpose of carrying out national geographic conditions monitoring is to obtain information of surface changes caused by human social and economic activities, so that the geographic information can be used to offer better services for the government, enterprise and public. Land cover data contains detailed geographic conditions information, thus has been listed as one of the important achievements in the national geographic conditions monitoring project. At present, the main issue of the production of the land cover data is about how to improve the classification accuracy. For the land cover data quality inspection and acceptance, classification accuracy is also an important check point. So far, the classification accuracy inspection is mainly based on human-computer interaction or manual inspection in the project, which are time consuming and laborious. By harnessing the automatic high-resolution remote sensing image change detection technology based on the ERDAS IMAGINE platform, this paper carried out the classification accuracy inspection test of land cover data in the project, and presented a corresponding technical route, which includes data pre-processing, change detection, result output and information extraction. The result of the quality inspection test shows the effectiveness of the technical route, which can meet the inspection needs for the two typical errors, that is, missing and incorrect update error, and effectively reduces the work intensity of human-computer interaction inspection for quality inspectors, and also provides a technical reference for the data production and quality control of the land cover data.

  3. From PISC to risk informed inspection

    International Nuclear Information System (INIS)

    Crutzen, S.; Lemaitre, P.; Fabbri, L.

    1998-01-01

    In this paper the correlation between inspection effectiveness, inspection qualification and risk informed inspection will be treated in view of harmonisation of inspection of nuclear plant components. Through the different phases of the PISC programme the necessity has been demonstrated to show the effectiveness of the inspection through a formal process of qualification in order to ensure that a certain level of effectiveness has been reached. Inspection qualification is indeed the way to quantify the capability level of inspection techniques used. The targets to be met by the inspection is information which should be obtained from risk based analyses. (author)

  4. Development of nondestructive evaluation techniques for DAM inspection. Progress report, January 1995 through August 1997

    Energy Technology Data Exchange (ETDEWEB)

    Brown, A. E.; Thomas, G.H.

    1997-09-04

    The Lawrence Livermore National Laboratory has concluded a two and a half year study on the development of an ultrasonic inspection system to inspect post stressed steel tendons on dams and flood gates. The inspection systems were part of a program for the California Department of Water Resources. The effort included the identification of the location and amount of corrosion damage to the tendons, identification of the cause of corrosion, and the technology for inhibiting corrosion. Several NDE methods for inspecting and quantifying damage to steel reinforced concrete water pipes were investigated and presented to the DWR for their consideration. The additional methods included Ground Penetrating RADAR, Electro- Potential Measurements, Infrared Technology, Pipe Inspection Crawlers (designed to travel inside pipelines and simultaneously report on the pipe condition as viewed by ultrasonic methods and video cameras from within the pipeline.) Reference to consultants hired by LLNL for similar on-site corrosion inspections were given to the DWR. The LLNL research into industries that have products to prevent corrosion resulted in the identification of an Innsbruck, Austria, company. This company claims to have products to permanently protect post- or pre-stressed tendons. The caveat is that the tendon protection system must be installed when the tendons are installed because no retrofit is available. Corrosion mitigation on the steel reinforcements surrounding the concrete was addressed through active and passive cathodic protection schemes. The combination of corrosion and erosion were addressed during consideration for the inspection of water-pump impeller-blades that are used in the three stage, million horsepower, pumping stations at Edmunston.

  5. RIMACS, Reactor Inspection Main Control System

    International Nuclear Information System (INIS)

    2008-01-01

    1 - Description of program or function: RIMACS prepares for automatic inspection files on each inspection item for the reactor. These automatic inspection files provide the data to move RIROB (Reactor Inspection Robot) with laser by interpreting the coordinates of LASPO (Laser Positioner) and the laser detecting device of RIROB in three dimensional space. In addition, when RIROB arrives at the inspecting location, the files provide all values of the manipulator's motions to acquire the ultrasonic data. RIMACS provides various modules in order to perform these complex functions, and the functions are programmed on graphic user interface for the convenience of the user. RIMACS provides various functions, such as insertion of reactor production data, selection of the reactor for inspection, the creation of automatic inspection file, the selection of the inspection item, inspection simulation, and automatic inspection procedures. It also provides all other functions, which are necessary for the inspection, such as operating program download and manual control of LASPO and RIROB, the inspection simulation and the inspection status display by means of the graphic screen, and SODAS (ultra-Sonic Data Acquisition System) drive verification. 2 - Methods: Moving path and operation procedures for inspection robot are generated automatically with Kinematics algorithm. 3 - Restrictions on the complexity of the problem: A graphics display with MS-Window capability is required

  6. Technical objectives of inspection

    International Nuclear Information System (INIS)

    Sorenson, R.J.; Stewart, K.B.; Schneider, R.A.

    1976-01-01

    The various technical objectives of inspection are discussed in a very general manner. The discussion includes how the inspection function is related to the assumed threat, the various degrees of assurance and reliance on criteria, and the hierarchy of assurance which is obtained from the various types or levels of inspection

  7. Development and Applicability Demonstration of a Remote Inspection Module for Inspection of Reactor Internals in an SFR

    International Nuclear Information System (INIS)

    Kim, Hoewoong; Joo, Youngsang; Park, Changgyu; Kim, Jongbum; Bae, Jinho

    2014-01-01

    Since liquid sodium is optically opaque, the ultrasonic inspection technique has been mainly employed for inspection of reactor internals in a Sodium-cooled Fast Reactor (SFR). Until now, two types of ultrasonic sensors have been mainly developed; immersion and waveguide sensors. An immersion sensor can provide a high-resolution image, but it may have problems in terms of reliability and life time because the sensor is exposed to high temperature during inspection. On the other hand, a waveguide sensor can maintain its performance during long-term inspection in high temperature because it installs an ultrasonic transducer in a cold region even though such a high-frequency ultrasonic wave cannot be used owing to the long propagation distance [4-6]. In this work, a remote inspection module employing four 10 m long waveguide sensors was newly developed and several performance tests were carried out in water to demonstrate the applicability of the developed remote inspection module to inspection of reactor internals in an SFR. In this work, a remote inspection module for inspection of reactor internals in an SFR was newly developed. The developed remote inspection module employs four 10 m long waveguide sensors for multiple inspection applications: a horizontal beam waveguide sensor for ranging inspection, two vertical beam waveguide sensors for viewing inspection and a 45 .deg. angle beam waveguide sensor for identification inspection. Several performance tests such as ranging, viewing and identification inspections were carried out for simulated nuclear fuel assembly specimens in water, and the applicability of the developed remote inspection module to inspection of reactor internals in an SFR was demonstrated

  8. Development and Applicability Demonstration of a Remote Inspection Module for Inspection of Reactor Internals in an SFR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hoewoong; Joo, Youngsang; Park, Changgyu; Kim, Jongbum [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Bae, Jinho [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Since liquid sodium is optically opaque, the ultrasonic inspection technique has been mainly employed for inspection of reactor internals in a Sodium-cooled Fast Reactor (SFR). Until now, two types of ultrasonic sensors have been mainly developed; immersion and waveguide sensors. An immersion sensor can provide a high-resolution image, but it may have problems in terms of reliability and life time because the sensor is exposed to high temperature during inspection. On the other hand, a waveguide sensor can maintain its performance during long-term inspection in high temperature because it installs an ultrasonic transducer in a cold region even though such a high-frequency ultrasonic wave cannot be used owing to the long propagation distance [4-6]. In this work, a remote inspection module employing four 10 m long waveguide sensors was newly developed and several performance tests were carried out in water to demonstrate the applicability of the developed remote inspection module to inspection of reactor internals in an SFR. In this work, a remote inspection module for inspection of reactor internals in an SFR was newly developed. The developed remote inspection module employs four 10 m long waveguide sensors for multiple inspection applications: a horizontal beam waveguide sensor for ranging inspection, two vertical beam waveguide sensors for viewing inspection and a 45 .deg. angle beam waveguide sensor for identification inspection. Several performance tests such as ranging, viewing and identification inspections were carried out for simulated nuclear fuel assembly specimens in water, and the applicability of the developed remote inspection module to inspection of reactor internals in an SFR was demonstrated.

  9. Inspection Strategies for Concrete Bridges

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Thoft-Christensen, Palle

    1989-01-01

    In this paper an optimal inspection strategy for concrete bridges based on periodic routine and detailed inspections is presented. The failure mode considered is corrosion of the reinforcement due to chlorides. A simple modelling of the corrosion and of the inspection strategy is presented....... The optimal inspection strategy is determined from an optimization problem, where the design variables are time intervals between detailed inspections and the concrete cover. The strategy is illustrated on a simple structure, namely a reinforced concrete beam....

  10. 9 CFR 381.76 - Post-mortem inspection, when required; extent; traditional, Streamlined Inspection System (SIS...

    Science.gov (United States)

    2010-01-01

    ...; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS... (NELS) Inspection System, both of which shall be used only for broilers and cornish game hens; the New... Inspection. (i) The SIS shall be used only for broilers and cornish game hens if: (a) The Administrator...

  11. Dose reduction for snubber inspection and testing

    International Nuclear Information System (INIS)

    Morrison, G.M.; Cotton, S.R.

    1991-01-01

    This paper reports that Health physics staff members at Grand Gulf Nuclear Station have implemented several dose reduction methods for snubber inspection, testing and changeout. These methods include construction maps to permit easy location of snubbers in the drywell, painting azimuth numbers on the inside drywell wall and biological shield wall to coincide with the maps, requiring pre-job briefings for quality inspectors and craft support personnel, using job history files for work planning, using experienced inspectors and craft personnel whenever possible, designating certain craft personnel solely for snubber work, and cutting out stuck snubber pins rather than attempting intact removal. The total dose for snubber-related tasks has been significantly reduced using these methods

  12. Methodology for Assessing the Status of a Physical Protection System on the Basis of Agency Inspections and Site Self-Assessments in Rosatom

    International Nuclear Information System (INIS)

    Piskarev, Alexandr S.; Babkin, Vladimir; Izmaylov, Alexandr V.; Kulikovsky, Mikhail; Matveev, V.A.; Shull, Douglas; Livingston, Linwood H.

    2010-01-01

    The Methodology presents general approaches to the assessment of PPS status including criteria and indicators of such assessment and procedures for evaluating different aspects of physical protection, taking into consideration the significance of the criteria. The regulation includes specific methods of the application of the criteria for the evaluation of different aspects of physical protection (PP), as well as for the comprehensive assessment of the PPS status in the form of text, tables, diagrams and examples. The Methodology is intended to facilitate agency inspections and site self-assessments of PPS at a NS as well as evaluation of their results. This regulation was approved by Rosatom Headquarters in October 2008 and is currently used in the process of agency PP inspections. The Methodology was discussed by Rosatom PP specialists, who take part in agency inspections and site self-assessments, at a workshop in Moscow, June 2009, and was presented at the 4th MPC and A Conference in Obninsk, October 2009. This paper presents the methodology and its practical application during Rosatom agency inspections and site self-assessments.

  13. Extension of the pre-retirement programmes

    CERN Multimedia

    2015-01-01

    Following a recommendation by the Standing Concertation Commitee at its meeting on 9 November 2015 and approval by the Director-General, please note that:   the Progressive Retirement Programme has been extended by one year, from 1 April 2016 until 31 March 2017;   the Scheme of Part-Time Work as a Pre-retirement Measure has also been extended by one year, from 1 January 2016 until 31 December 2016. Further information is available from the following sites: - https://admin-eguide.web.cern.ch/en/procedure/progressive-retirement-programme-prp - https://admin-eguide.web.cern.ch/en/procedure/part-time-work-pre-retirement-measure-ptp Human Resources Department Tel.: 79257 / 73903

  14. Inspection of disposal canisters components

    International Nuclear Information System (INIS)

    Pitkaenen, J.

    2013-12-01

    This report presents the inspection techniques of disposal canister components. Manufacturing methods and a description of the defects related to different manufacturing methods are described briefly. The defect types form a basis for the design of non-destructive testing because the defect types, which occur in the inspected components, affect to choice of inspection methods. The canister components are to nodular cast iron insert, steel lid, lid screw, metal gasket, copper tube with integrated or separate bottom, and copper lid. The inspection of copper material is challenging due to the anisotropic properties of the material and local changes in the grain size of the copper material. The cast iron insert has some acoustical material property variation (attenuation, velocity changes, scattering properties), which make the ultrasonic inspection demanding from calibration point of view. Mainly three different methods are used for inspection. Ultrasonic testing technique is used for inspection of volume, eddy current technique, for copper components only, and visual testing technique are used for inspection of the surface and near surface area

  15. Radiation control in the nondestructive inspection

    International Nuclear Information System (INIS)

    Kariya, Yukihiro

    1982-01-01

    In the early days of radiation nondestructive inspection about ten years ago, the loss of radiation sources and careless radiation exposure gave the impression of radiography inspection being immediately slipshod management. In this problem, the peculiar nature of the business in this field is involved. In Nondestructive Inspection Co., Ltd., besides the safety management of radioisotopes, the radiation exposure control of personnel in the regular inspection of nuclear power plants has become increasingly important. The following matters are described: radiation utilization in nondestructive inspection (X- and #betta#-ray radiography, #betta#-ray leak test on shield), radiation control problems in nondestructive inspection business (the peculiar aspects of the business, the analysis of the incidents related with nondestructive inspection), and the practice of radiation control in nondestructive inspection in Nondestructive Inspection Co., Ltd. (Mori, K.)

  16. Estimation of inspection effort

    International Nuclear Information System (INIS)

    Mullen, M.F.; Wincek, M.A.

    1979-06-01

    An overview of IAEA inspection activities is presented, and the problem of evaluating the effectiveness of an inspection is discussed. Two models are described - an effort model and an effectiveness model. The effort model breaks the IAEA's inspection effort into components; the amount of effort required for each component is estimated; and the total effort is determined by summing the effort for each component. The effectiveness model quantifies the effectiveness of inspections in terms of probabilities of detection and quantities of material to be detected, if diverted over a specific period. The method is applied to a 200 metric ton per year low-enriched uranium fuel fabrication facility. A description of the model plant is presented, a safeguards approach is outlined, and sampling plans are calculated. The required inspection effort is estimated and the results are compared to IAEA estimates. Some other applications of the method are discussed briefly. Examples are presented which demonstrate how the method might be useful in formulating guidelines for inspection planning and in establishing technical criteria for safeguards implementation

  17. Bridging of inspection with corrosion management

    International Nuclear Information System (INIS)

    Zamaluddin Ali; Mohd Hawari Hassan; Rohana Jaafar

    2009-01-01

    Formerly, Inspection and Corrosion Engineers have less interaction and sharing of information to each other even they are working in the same plant or organization. Inspection finding either from visual inspection or NDT techniques rarely shared with corrosion engineers. Similarly corrosion engineers rarely discussed their corrosion prediction and potential damage mechanism with inspection engineers. A demanding request of more holistic plant safety and asset integrity promoted the introduction and implementation of Risk Based Inspection (RBI). RBI analysis demands the input mainly from both disciplines i.e. Inspection and Corrosion Engineers. Most of RBI methodologies are once-off analysis approach which also promoted once-off interaction between Inspection and Corrosion Engineers. PETRONAS has developed a methodology with supporting software, integrating both Inspection and Corrosion disciplines. PETRONAS Risk Based Inspection (PRBI) is intended to promote continuous integration of Inspection and Corrosion management of the plant through out the whole life cycle starting from the design stage to fabrication, operation and decommissions stage. (author)

  18. Part-time work scheme as a pre-retirement measure

    CERN Multimedia

    2004-01-01

    Upon the proposal of the Standing Concertation Committee at its meeting on 3 December 2003, the Director-General has approved the extension for one year of the Part-time work scheme as a pre-retirement measure, until 1 January 2005 inclusive. Human Resources Department Tel. 72808/74128

  19. Gentilly 2 steam generators Spring 2000 outage: tubesheet waterlance cleaning and inspection; upper bundle inspection

    International Nuclear Information System (INIS)

    Akeroyd, J.K.; Plante, S.

    2000-01-01

    A review of the secondary side maintenance activities recently completed during the Gentilly 2 Annual Spring 2000 Maintenance Outage. Activities included: 1) Tubesheet intertube waterlance cleaning and visual inspection, 2) First tube support plate, in-bundle visual inspection of the hot leg, and 3) Upper bundle tube support plate visual inspection. A description of the waterlancing and inspection equipment and setup in the RB at Gentilly 2 is provided. Several innovative techniques were successfully employed and yielded savings in critical path duration, labour and personnel radiation dose. These included accessing the SG tubesheet region through one handhole only and sludge removal utilizing the SG blowdown system. Plant personnel judged tubesheet sludge removal successful. Before and after results of the cleaning process along with samples of the visual inspection results are provided. Inspection of the first support plate, which was a repeat of an inspection done in 1997, was conducted along with an in-bundle inspection of the upper tube supports. Results are presented along with a discussion of the implications for future steam generator maintenance. (author)

  20. A study on improvements of inspection efficiency with remote transmission of inspection data

    International Nuclear Information System (INIS)

    Kikuchi, Masahiro

    2010-01-01

    Current information networks technology brought secure and convenient condition of information transmission, so that inspectorates intend to apply such technology to optimize current inspection efforts. IAEA established the Remote Monitoring Project (RMP) in 1996 and started to draft safeguards concepts, and approaches to refer the implementation of remote monitoring technology and to compromise with relationship between current inspection activities and the remote monitoring technologies. Although communications costs and conditions of secured communication should be further investigated, the technologies would have a possibility to reduce current inspection efforts. We would face at the step to study on the several issues such as what measures could be candidate to use, how much cost we needs, what kind of technical risks would be concerned, further improvements could be achieved by comparison with current inspection costs and effectiveness. This paper reports on the expectation points and relevant technical attention points which are related to apply unattended inspection system with remote data transmission to the flows and inventory verification of item and bulk facility, respectively, in order to improve inspection efforts. (author)

  1. Study on the inspection item and inspection method of HTGR fuel

    International Nuclear Information System (INIS)

    Na, Sang Ho; Kim, Y. K.; Jeong, K. C.; Oh, S. C.; Cho, M. S.; Kim, Y. M.; Lee, Y. W.

    2006-01-01

    The type of HTGR(High Temperature Gas-cooled Reactor) fuel is different according to the reactor type. Generally the HTGR fuel has two types. One is a block type, which is manufactured in Japan or America. And the other is a pebble type, which is manufactured in China. Regardless of the fuel type, the fuel manufacturing process started from the coated particle, which is consisted of fuel kernel and the 4 coating layers. Korea has a plan to fabricate a HTGR fuel in near future. The appropriate quality inspection standards are requested to produce a sound and reliable coated particle for HTGR fuel. Therefore, the inspection items and the inspection methods of HTGR fuel between Japan and China, which countries have the manufacturing process, are investigated to establish a proper inspection standards of our product characteristics

  2. The Ontario hydro low pressure turbine disc inspection program automated ultrasonic inspection systems - an overview

    International Nuclear Information System (INIS)

    Huggins, J.W.; Chopcian, M.; Grabish, M.

    1990-01-01

    An overview of the Ontario Hydro Low Pressure Turbine Disc Inspection Program is presented. The ultrasonic inspection systems developed in-house to inspect low pressure turbine discs at Pickering and Bruce Nuclear Generating stations are described. Three aspects of the program are covered: PART I - Background to inspection program, disc cracking experience, and development of an in-house inspection capability: PART II - System development requirements; ultrasonic equipment, electromechanical subsystems and instrumentation console: PART III - Customized software for flaw detection, sizing, data acquisition/storage, advanced signal processing, reports, documentation and software based diagnostics

  3. In service inspection and repair of sodium cooled ASTRID prototype

    Energy Technology Data Exchange (ETDEWEB)

    Baque, F.; Jadot, F. [French Atomic Commission, Cadarache Centre, 13108 Saint Paul lez Durance Cedex, (France); Marlier, R. [AREVA, 10 rue Recamier, 69456 Lyon cedex 06, (France); Saillant, J-F. [AREVA/NDE Solutions, 4 rue Thomas Dumorey, BP 70385, 71109 Chalon sur Saone Cedex, (France); Delalande, V. [EDF R and D, 6, quai Watier, 78400 Chatou, (France)

    2015-07-01

    In the frame of the large R and D work which is performed for the future ASTRID sodium cooled prototype, In Service Inspection and Repair (ISI and R) has been identified as a major issue to be taken into account in order to enlarge the plant safety, to consolidate its availability and to protect the associated investment. After the first part of pre-conceptual design phase (2008-2012), the running second part of pre-conceptual phase (2013-2015) allows to increase the ISI and R tool ability for immersed sodium structures of ASTRID, at about 200 deg. C, on the basis of consolidated specifications and thanks to their qualification through more and more realistic laboratory tests and simulation with CIVA code. ISI and R items are being developed and qualified during a pluri-annual program which mainly deals with the reactor block structures, the primary components and circuit, and the Power Conversion System. It ensures a strong connection between the reactor designers and inspection specialists, as the optimization of inspectability and repairability is looked at: this already induced specific rules for design, in order to shorten and ease the ISI and R operations, which have been merged into RCC-MRx rules. In the frame of increasing technology readiness level with corresponding performance demonstration, this paper presents R and D dealing with the ISI and R items: it highlights the sensor development (both ultrasonic and electromagnetic concepts, compatible with sodium at 200 deg. C), then their applications for ASTRID structure control (under sodium telemetry, imaging and NDE). Activity for repair is also presented (a single laser tool for sodium sweeping, machining and welding), and finally the effort for associated robotic (generic program for ASTRID applications, specific technological tools for sodium medium, tight immersed bell). The main results of testing and simulation are given for telemetry, vision, NDE applications, laser process repair and under sodium

  4. Application of the ultrasonic phased array technique to alloy 182 weld inspection in PWR

    International Nuclear Information System (INIS)

    Hsiao, Chu Chung; Shie, Namg Chian; Chu, Shyr Liang; Lee, Sou See; Toung, Jean Chung; Su, Liang Chun; Yang, Hai Ming

    2006-01-01

    Cracks were found in nickel-based welds frequently in some nuclear power plants. The development of inspection technique capability of finding these cracks is thus in great demand. The difficulties of inspection and evaluation for nickel-based welds include ultrasonic reflection of interface of dissimilar materials, ultrasonic distortion of anisotropic microstructure, and signal-to-noise ratio reduction of coarse grain. In this study, an Alloy 182 mock-up with the same size and material properties as in the field is designed and fabricated. The Alloy 182 mock-up specimen contains various cracks and notches for calibration. Phased array UT and other ultrasonic inspection techniques are used in this study. Based on the experiment results, the phased array probe with 2D dual crystals and low frequency (1.5MHz) longitudinal wave is found to perform well. Finally, phased array ultrasonic testing technique has been approved to be an effectively nondestructive test method for DMW with real size testing block involved. Typically, phased array probe can generate sharp tip diffraction signal and thus reliable and accurate result can be obtained for sizing the defect. Furthermore, phased array probe can also generate various angles and focal lengths and thus combinatorial effect can be achieved for several traditional probes. With a full understanding of the beam behavior and an optimized delay laws, the phased away ultrasonic technique integrated with an automatic scanner will achieve not only to save scanning time but also to reduce the amount of radiation exposure on field inspection.

  5. A Novel Method of Autonomous Inspection for Transmission Line based on Cable Inspection Robot LiDAR Data

    Directory of Open Access Journals (Sweden)

    Xinyan Qin

    2018-02-01

    Full Text Available With the growth of the national economy, there is increasing demand for electricity, which forces transmission line corridors to become structurally complicated and extend to complex environments (e.g., mountains, forests. It is a great challenge to inspect transmission line in these regions. To address these difficulties, a novel method of autonomous inspection for transmission line is proposed based on cable inspection robot (CIR LiDAR data, which mainly includes two steps: preliminary inspection and autonomous inspection. In preliminary inspection, the position and orientation system (POS data is used for original point cloud dividing, ground point filtering, and structured partition. A hierarchical classification strategy is established to identify the classes and positions of the abnormal points. In autonomous inspection, CIR can autonomously reach the specified points through inspection planning. These inspection targets are imaged with PTZ (pan, tilt, zoom cameras by coordinate transformation. The feasibility and effectiveness of the proposed method are verified by test site experiments and actual line experiments, respectively. The proposed method greatly reduces manpower and improves inspection accuracy, providing a theoretical basis for intelligent inspection of transmission lines in the future.

  6. POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2005-04-01

    This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and

  7. OSE inspections: A different perspective

    International Nuclear Information System (INIS)

    Ware, J.H.

    1987-01-01

    The Office of Security Evaluation (OSE) is a staff activity of the Assistant Secretary for Defense Programs (ASDP) and is responsible for the conduct of an inspection and evaluation program. The OSE Inspection Division conducts assessments of the effectiveness of Department of Energy (DOE) Safeguards and Security policies and protection programs. The inspections are conducted by OSE Inspectors and Support Specialists. Prior to the author's participation in the inspection of the San Francisco Operations Office, a DOE Field Office employee had never played an active role in an OSE Inspection of another field office. This paper discloses his experience as an OSE Inspector

  8. Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada, for Calendar Year 2006

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the ''Resource Conservation and Recovery Act'' (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs), CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2006. Quarterly site inspections were performed in March, June, September, and December of 2006. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. One additional inspection was performed after a precipitation event that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2006. No significant changes in site conditions were noted during this inspection, and no corrective actions were necessary. A copy of the inspection checklist and field notes completed during this additional inspection is included in Appendix A of this report. Precipitation records for 2006

  9. 76 FR 34740 - Agency Information Collection Activities: Application for Waiver of Passport and/or Visa

    Science.gov (United States)

    2011-06-14

    ... Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act... Regulatory Affairs, Office of Management and Budget. Comments should be addressed to the OMB Desk Officer for... aliens who wish to waive the documentary requirements for passports and/or visas due to an unforeseen...

  10. 20 CFR 661.430 - Under what conditions may the Governor submit a Workforce Flexibility Plan?

    Science.gov (United States)

    2010-04-01

    ... Secretary may approve, a workforce flexibility (work-flex) plan under which the State is authorized to waive... a Workforce Flexibility Plan? 661.430 Section 661.430 Employees' Benefits EMPLOYMENT AND TRAINING... I OF THE WORKFORCE INVESTMENT ACT Waivers and Work-Flex Waivers § 661.430 Under what conditions may...

  11. 43 CFR 12.925 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ...) through (3) of this section are automatically waived (i.e., recipients need not obtain such prior... promptly whenever the amount of Federal authorized funds is expected to exceed the needs of the recipient...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  12. Endoscopic inspection of steam turbines

    International Nuclear Information System (INIS)

    Maliniemi, H.; Muukka, E.

    1990-01-01

    For over ten years, Imatran Voima Oy (IVO) has developed, complementary inspection methods for steam turbine condition monitoring, which can be applied both during operation and shutdown. One important method used periodically during outages is endoscopic inspection. The inspection is based on the method where the internal parts of the turbine is inspected through access borings with endoscope and where the magnified figures of the internal parts is seen on video screen. To improve inspection assurance, an image-processing based pattern recognition method for cracks has been developed for the endoscopic inspection of turbine blades. It is based on the deduction conditions derived from the crack shape. The computer gives an alarm of a crack detection and prints a simulated image of the crack, which is then checked manually

  13. Packaging supplier inspection guide

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Gregg, R.E.; Kido, C.; Boyle, C.D.

    1991-05-01

    This is document is a guide for conducting quality assurance inspections of transportations packaging suppliers, where suppliers are defined as designers, fabricators, distributors, users, or owners of transportation packaging. This document can be used during an inspection to determine regulatory compliance within the requirements of 10 Code of Federal Regulations, Part 71, Subpart H (10 CFR 71.101--71.135). The guidance described in this document provides a framework for an inspection. It provides the inspector with the flexibility to adapt the methods and concepts presented here to meet the needs of the particular facility being inspected. The guide was developed to ensure a structured and consistent approach for inspections. The method treats each activity at a supplier facility as a separate entity (or functional element), and combines the activities within the framework of an ''inspection tree.'' The method separates each functional element into several areas of performance and then identifies guidelines, based on regulatory requirements, to be used to qualitatively rate each area. This document was developed to serve as a field manual to facilitate the work of inspectors. 1 ref., 1 fig., 5 tabs

  14. Enabling inspection solutions for future mask technologies through the development of massively parallel E-Beam inspection

    Science.gov (United States)

    Malloy, Matt; Thiel, Brad; Bunday, Benjamin D.; Wurm, Stefan; Jindal, Vibhu; Mukhtar, Maseeh; Quoi, Kathy; Kemen, Thomas; Zeidler, Dirk; Eberle, Anna Lena; Garbowski, Tomasz; Dellemann, Gregor; Peters, Jan Hendrik

    2015-09-01

    The new device architectures and materials being introduced for sub-10nm manufacturing, combined with the complexity of multiple patterning and the need for improved hotspot detection strategies, have pushed current wafer inspection technologies to their limits. In parallel, gaps in mask inspection capability are growing as new generations of mask technologies are developed to support these sub-10nm wafer manufacturing requirements. In particular, the challenges associated with nanoimprint and extreme ultraviolet (EUV) mask inspection require new strategies that enable fast inspection at high sensitivity. The tradeoffs between sensitivity and throughput for optical and e-beam inspection are well understood. Optical inspection offers the highest throughput and is the current workhorse of the industry for both wafer and mask inspection. E-beam inspection offers the highest sensitivity but has historically lacked the throughput required for widespread adoption in the manufacturing environment. It is unlikely that continued incremental improvements to either technology will meet tomorrow's requirements, and therefore a new inspection technology approach is required; one that combines the high-throughput performance of optical with the high-sensitivity capabilities of e-beam inspection. To support the industry in meeting these challenges SUNY Poly SEMATECH has evaluated disruptive technologies that can meet the requirements for high volume manufacturing (HVM), for both the wafer fab [1] and the mask shop. Highspeed massively parallel e-beam defect inspection has been identified as the leading candidate for addressing the key gaps limiting today's patterned defect inspection techniques. As of late 2014 SUNY Poly SEMATECH completed a review, system analysis, and proof of concept evaluation of multiple e-beam technologies for defect inspection. A champion approach has been identified based on a multibeam technology from Carl Zeiss. This paper includes a discussion on the

  15. Examination of the association between announced inspections and inspection scores.

    Science.gov (United States)

    Waters, A Blake; VanDerslice, James; Porucznik, Christina A; Kim, Jaewhan; DeLegge, Royal; Durrant, Lynne

    2013-09-01

    In 2010 the Salt Lake Valley Health Department conducted a pilot of an announced inspection program utilizing a randomized assignment of restaurants to an intervention group with announced inspections and a control group that remained on the usual schedule of unannounced inspections. After adjusting for food type, visible kitchen, outside quality assurance, season, and standardized inspector, significant reductions were found in the odds ratios of personal hygiene (adjusted odds ratios [aOR] = 0.11, p = .00) and equipment cleanliness (aOR = 0.19, p = .00) violations. In the models for the control group, none of the odds ratios were statistically different from one, indicating no change in the postintervention time period as compared to the preintervention period.

  16. Overview of the software inspection process

    Energy Technology Data Exchange (ETDEWEB)

    Lane, G.L.; Dabbs, R. [Sandia National Labs., Albuquerque, NM (United States)

    1997-11-01

    This tutorial introduces attendees to the Inspection Process and teaches them how to organize and participate in a software inspection. The tutorial advocates the benefits of inspections and encourages attendees to socialize the inspection process in their organizations.

  17. Fully Employing Software Inspections Data

    Science.gov (United States)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  18. Knowingly but naively: The overpowering influence of innocence on interrogation rights decision-making.

    Science.gov (United States)

    Scherr, Kyle C; Normile, Christopher J; Bierstetel, Sabrina J; Franks, Andrew S; Hawkins, Ian

    2018-02-01

    Most suspects waive the guaranteed protections that interrogation rights afford them against police intimidation. One factor thought to motivate suspects' inclination to waive their rights stems from the acquiescence bias whereby suspects mindlessly comply with interrogators' requests. However, research bearing on the phenomenology of innocence has demonstrated the power of innocents' mindset, which could motivate some innocent suspects to waive their rights knowingly (instead of mindlessly complying). To test these ideas, participants (N = 178) were (a) rightfully (guilty) or wrongfully (innocent) accused of wrongdoing during an experimental session, (b) administered 1 of 2 forms that by signing either waived or invoked their rights to a student advocate, and (c) given questions to assess their degree of knowing during the decision-making process (i.e., extent to which individuals were cognizant of their decisions). Results demonstrated that unknowing innocent and guilty individuals tended to passively comply, engaging in a pre-interrogation acquiescence bias by signing waive and invoke forms at similar rates. But, as participants became more cognizant of their decisions, they acquiesced at lower rates and their change from acquiescence differed depending on their status. As innocents became more cognizant, they signed the waiver form at higher rates than the invoke form, thereby demonstrating that innocence can motivate some suspects to knowingly forgo their rights. Conversely, as guilty individuals became more cognizant, they signed the invoke form at higher rates than the waiver form. These findings have implications for reforming pre-interrogation protocols, protecting suspects' civil liberties, and preventing innocents from offering false self-incriminating evidence. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  19. Piping inspection round robin

    International Nuclear Information System (INIS)

    Heasler, P.G.; Doctor, S.R.

    1996-04-01

    The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths

  20. INSPECT: A graphical user interface software package for IDARC-2D

    Science.gov (United States)

    AlHamaydeh, Mohammad; Najib, Mohamad; Alawnah, Sameer

    Modern day Performance-Based Earthquake Engineering (PBEE) pivots about nonlinear analysis and its feasibility. IDARC-2D is a widely used and accepted software for nonlinear analysis; it possesses many attractive features and capabilities. However, it is operated from the command prompt in the DOS/Unix systems and requires elaborate text-based input files creation by the user. To complement and facilitate the use of IDARC-2D, a pre-processing GUI software package (INSPECT) is introduced herein. INSPECT is created in the C# environment and utilizes the .NET libraries and SQLite database. Extensive testing and verification demonstrated successful and high-fidelity re-creation of several existing IDARC-2D input files. Its design and built-in features aim at expediting, simplifying and assisting in the modeling process. Moreover, this practical aid enhances the reliability of the results and improves accuracy by reducing and/or eliminating many potential and common input mistakes. Such benefits would be appreciated by novice and veteran IDARC-2D users alike.

  1. Development of nuclear fuel rod inspection technique using ultrasonic resonance phenomenon

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Myung Sun; Lee, Jong Po; Ju, Young Sang [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-11-01

    Acoustic resonance scattering from a nuclear fuel rod in water is analyzed. A new model for the background which is attributed to the interference of reflected wave and diffracted wave is found and here named {sup t}he inherent background{sup .} The resonance spectrum of a fuel rod is obtained by subtracting the inherent background from the scattered pressure. And also analyzed are the effect of material damping of cladding tube and pellet on the resonance spectrum of a fuel rod. The propagation characteristics of circumferential waves which cause the resonances of cladding tube is produced and the appropriate resonance modes for the application to the inspection of assembled fuel rods are selected. The resonance modes are experimentally measured for pre- and post-irradiated fuel rods and the validation of the fuel rod inspection using ultrasonic resonance phenomenon is examined. And thin ultrasonic sensors accessible into the narrow interval (about 2-3mm) between assembled fuel rods are designed and manufactured. 14 refs. (Author).

  2. In-service inspection techniques

    International Nuclear Information System (INIS)

    Backfisch, W.; Zipser, R.R.

    1980-01-01

    The owner of a nuclear power plant (NPP) is obligated and interested to maintain - by regular maintenance and in-service inspections - the operational safety and availability of the plant for the subsequent operating period in a condition, as is specified as the basis of the erection and the last operational permits. In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor or on a boiling-water reactor) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  3. Detailed simulation of ultrasonic inspections

    International Nuclear Information System (INIS)

    Chaplin, K.R.; Douglas, S.R.; Dunford, D.

    1997-01-01

    Simulation of ultrasonic inspection of engineering components have been performed at the Chalk River Laboratories of AECL for over 10 years. The computer model, called EWE for Elastic Wave Equations, solves the Elastic Wave Equations using a novel finite difference scheme. It simulates the propagation of an ultrasonic wave from the transducer to a flaw, the scatter of waves from the flaw, and measurement of signals at a receive transducer. Regions of different materials, water and steel for example, can be simulated. In addition, regions with slightly different material properties from the parent material can be investigated. The two major types of output are displays of the ultrasonic waves inside the component and the corresponding A-scans. EPRI and other organizations have used ultrasonic models for: defining acceptable ultrasonic inspection procedures, designing and evaluating inspection techniques, and for quantifying inspection reliability. The EWE model has been applied to the inspection of large pipes in a nuclear plant, gas pipeline welds and steam generator tubes. Most recent work has dealt with the ultrasonic inspection of pressure tubes in CANDU reactors. Pressure tube inspections can reliably detect and size defects; however, there are improvements that can be made. For example, knowing the sharpness of a flaw-tip is crucial for fitness for service assessments. Computer modelling of the ultrasonic inspection of flaws with different root radius has suggested inspection techniques that provide flaw tip radius information. A preliminary investigation of these methods has been made in the laboratory. The basis for the model will be reviewed at the presentation. Then the results of computer simulations will be displayed on a PC using an interactive program that analyzes simulated A-scans. This software tool gives inspection staff direct access to the results of computer simulations. (author)

  4. Comparison of API 510 pressure vessels inspection planning with API 581 risk-based inspection planning approaches

    International Nuclear Information System (INIS)

    Shishesaz, Mohammad Reza; Nazarnezhad Bajestani, Mohammad; Hashemi, Seyed Javad; Shekari, Elahe

    2013-01-01

    To ensure mechanical integrity, all pressure vessels shall be inspected at the intervals provided in inspection codes or based on a risk-based inspection (RBI) assessment. The RBI assessment may allow previously established inspection intervals to be extended. This paper describes the methodology, analysis and results of two RBI studies conducted on 293 pressure vessel components in two crude oil distillation units. Based on API RBI methodology in API 581 (2008), risk target concept was used for determining inspection dates. It was shown that when thinning is the major active damage, the RBI recommended intervals are as long as twice the API 510 intervals. This paper summarizes that, as a fundamental step in the risk calculation, RBI has a more defined methodology for evaluating equipment for multiple damage mechanisms and a more defined approach to specify the use of other inspection technologies beyond the traditional visual, ultrasonic, and radiography tests. -- Highlights: • RBI calculated inspection intervals are as long as twice of API 510 inspection code. • Two case studies verified the advantage of RBI in inspection planning. • RBI is a more reliable methodology when evaluating multiple damage mechanisms. • Damage factor calculations can be used for determining RSFa value in FFS assessments

  5. 23 CFR 630.404 - Standards.

    Science.gov (United States)

    2010-04-01

    ... PROCEDURES Geodetic Markers § 630.404 Standards. (a) Highway purposes may best be served by the establishment... than one kilometer. These requirements may be waived only with the approval of the Administrator. (b... permanent points, preferably within the right-of-way but at points where their use does not introduce...

  6. 7 CFR 800.199 - Conflict-of-interest provisions.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Conflict-of-interest provisions. 800.199 Section 800... Delegations, Designations, Approvals, Contracts, and Conflicts of Interest § 800.199 Conflict-of-interest...) Prohibited conflicts of interest. Unless waived on a case-by-case basis by the Administrator under section 11...

  7. Bill authorizing the approval of the additional protocol to the construction agreement between the French government and the International organization of fusion energy for the joint implementation of the ITER project, and relative to the role of the labour inspection on the ITER international organization site and dealing with occupational health and safety

    International Nuclear Information System (INIS)

    2009-10-01

    The aim of the additional protocol to the construction agreement between the French Government and the ITER Organization is to allow the French labour inspection services to control the good respect of the French occupational health and safety regulation at the project site (Cadarache, Bouches du Rhone) and to play its role of adviser to the persons responsible for the organization. This bill gives permission to the approval of this additional protocol. It allows the labour inspectors to do their job on the ITER site. (J.S.)

  8. Use of volunteers' information to support proactive inspection of hydraulic structures

    Science.gov (United States)

    Cortes Arevalo, Juliette; Sterlacchini, Simone; Bogaard, Thom; Frigerio, Simone; Junier, Sandra; Schenato, Luca; van den Giesen, Nick

    2016-04-01

    Proactive management is particularly important to deal with the increasing occurrence of hydro-meteorological hazards in mountain areas were threats are often caused by multiple and sudden onset hazards such as debris flows. Citizen volunteers can be involved in supporting technicians on inspecting the structures' functional status. Such collaborative effort between managing organizations and local volunteers becomes more important under limited resources. To consider volunteers' information in support of proactive inspection of hydraulic structures, we developed a methodology applicable in day-to-day risk management. At first, in collaboration with technicians-in-charge, a data collection approach was developed for first level or pre-screening visual inspections that can be performed by volunteers. Methods comprise of a data collection exercise, an inspection forms and a learning session based on existent procedures in the FVG region and neighbouring regions. To systematically evaluate the individual inspection reports, we designed a support method by means of a multi-criteria method with fuzzy terms. The method allows the technicians-in-charge to categorize the reports in one of three levels, each corresponding with a course of action. To facilitate the evaluation of inspection reports, we transformed the decision support method into a prototype Web-GIS application. The design process of the Web-GIS framework followed a user-centred approach. The conceptual design incorporates four modules for managing the inspection reports: 1) Registered users, 2) Inspection planning; 3) Available reports and 4) Evaluation of reports. The development of the prototype focused on the evaluation module and was implemented based on standard and interoperable open source tools. Finally, we organized a workshop with technicians in the study area to test the decision support method and get insights about the usefulness of the Web-GIS framework. Participants that took part of the

  9. OSE inspection of computer security: Review

    International Nuclear Information System (INIS)

    Jaehne, E.M.

    1987-01-01

    The inspection process within the Department of Energy (DOE) serves the function of analyzing and reporting on the performance of security measures and controls in specific areas at sites throughout DOE. Three aspects of this process are discussed based on experience in computer security: Policy basis of performance inspections; Role and form of standards and criteria in inspections; and Conducting an inspection using the standards and criteria. Inspections are based on DOE and other applicable policy in each area. These policy statements have a compliance orientation in which the paper trail is often more clearly discernible than the security intention. The relationship of policy to performance inspections is discussed. To facilitate bridging the gap between the paper trail and the security intention defined by policy, standards and criteria were developed in each area. The consensus process and structure of the resulting product for computer security are discussed. Standards and criteria are inspection tools that support the site in preparing for an inspection and the inspector in conducting one. They form a systematic approach that facilitates consistency in the analysis and reporting of inspection results. Experience using the computer security standards and criteria is discussed

  10. Infrared thermography inspection methods applied to the target elements of W7-X divertor

    Energy Technology Data Exchange (ETDEWEB)

    Missirlian, M. [Association Euratom-CEA, CEA/DSM/DRFC, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France)], E-mail: marc.missirlian@cea.fr; Traxler, H. [PLANSEE SE, Technology Center, A-6600 Reutte (Austria); Boscary, J. [Max-Planck-Institut fuer Plasmaphysik, Euratom Association, Boltzmannstr. 2, D-85748 Garching (Germany); Durocher, A.; Escourbiac, F.; Schlosser, J. [Association Euratom-CEA, CEA/DSM/DRFC, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France); Schedler, B.; Schuler, P. [PLANSEE SE, Technology Center, A-6600 Reutte (Austria)

    2007-10-15

    The non-destructive examination (NDE) method is one of the key issues in developing highly loaded plasma-facing components (PFCs) for a next generation fusion devices such as W7-X and ITER. The most critical step is certainly the fabrication and the examination of the bond between the armour and the heat sink. Two inspection systems based on the infrared thermography methods, namely, the transient thermography (SATIR-CEA) and the pulsed thermography (ARGUS-PLANSEE), are being developed and have been applied to the pre-series of target elements of the W7-X divertor. Results obtained from qualification experiences performed on target elements with artificial calibrated defects allowed to demonstrate the capability of the two techniques and raised the efficiency of inspection to a level which is appropriate for industrial application.

  11. Infrared thermography inspection methods applied to the target elements of W7-X divertor

    International Nuclear Information System (INIS)

    Missirlian, M.; Traxler, H.; Boscary, J.; Durocher, A.; Escourbiac, F.; Schlosser, J.; Schedler, B.; Schuler, P.

    2007-01-01

    The non-destructive examination (NDE) method is one of the key issues in developing highly loaded plasma-facing components (PFCs) for a next generation fusion devices such as W7-X and ITER. The most critical step is certainly the fabrication and the examination of the bond between the armour and the heat sink. Two inspection systems based on the infrared thermography methods, namely, the transient thermography (SATIR-CEA) and the pulsed thermography (ARGUS-PLANSEE), are being developed and have been applied to the pre-series of target elements of the W7-X divertor. Results obtained from qualification experiences performed on target elements with artificial calibrated defects allowed to demonstrate the capability of the two techniques and raised the efficiency of inspection to a level which is appropriate for industrial application

  12. The interactive on-site inspection system: An information management system to support arms control inspections

    Energy Technology Data Exchange (ETDEWEB)

    DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

    1996-12-01

    The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

  13. UF{sub 6} cylinder inspections at PGDP

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, G.W.; Whinnery, W.N. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

    1991-12-31

    Routine inspections of all UF{sub 6} cylinders at the Paducah Gaseous Diffusion Plant have been mandated by the Department of Energy. A specific UF{sub 6} cylinder inspection procedure for what items to inspect and training for the operators prior to inspection duty are described. The layout of the cylinder yards and the forms used in the inspections are shown. The large number of cylinders (>30,000) to inspect and the schedule for completion on the mandated time table are discussed. Results of the inspections and the actions to correct the deficiencies are explained. Future inspections and movement of cylinders for relocation of certain cylinder yards are defined.

  14. 10 CFR 21.41 - Inspections.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Inspections. 21.41 Section 21.41 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Inspections, Records § 21.41 Inspections. Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part shall...

  15. Quality assurance in production and use of special form radioactive material - focal points in BAM approvals

    International Nuclear Information System (INIS)

    Rolle, A.; Buhlemann, L.

    2004-01-01

    BAM as the competent authority for approval of special form radioactive material attaches great importance to a detailed audit of the required quality assurance programs for design, manufacture, testing, documentation, use, maintenance and inspection. Applicants have to submit, together with application documentation information on general arrangements for quality assurance, as well as on quality assurance in production and in operation. Fields where BAM has often found deficiencies are leak test methods, weld seam quality and the safety level after use

  16. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  17. Computerized automated remote inspection system

    International Nuclear Information System (INIS)

    The automated inspection system utilizes a computer to control the location of the ultrasonic transducer, the actual inspection process, the display of the data, and the storage of the data on IBM magnetic tape. This automated inspection equipment provides two major advantages. First, it provides a cost savings, because of the reduced inspection time, made possible by the automation of the data acquisition, processing, and storage equipment. This reduced inspection time is also made possible by a computerized data evaluation aid which speeds data interpretation. In addition, the computer control of the transducer location drive allows the exact duplication of a previously located position or flaw. The second major advantage is that the use of automated inspection equipment also allows a higher-quality inspection, because of the automated data acquisition, processing, and storage. This storage of data, in accurate digital form on IBM magnetic tape, for example, facilitates retrieval for comparison with previous inspection data. The equipment provides a multiplicity of scan data which will provide statistical information on any questionable volume or flaw. An automatic alarm for location of all reportable flaws reduces the probability of operator error. This system has the ability to present data on a cathode ray tube as numerical information, a three-dimensional picture, or ''hard-copy'' sheet. One important advantage of this system is the ability to store large amounts of data in compact magnetic tape reels

  18. Automated Inspection of Aircraft

    Science.gov (United States)

    1998-04-01

    This report summarizes the development of a robotic system designed to assist aircraft inspectors by remotely deploying non-destructive inspection (NDI) sensors and acquiring, processing, and storing inspection data. Carnegie Mellon University studie...

  19. Validation results of the pre-service ultrasonic inspections of the Sizewell B pressurizer and steam generators and reactor coolant pump flywheels

    International Nuclear Information System (INIS)

    Conroy, P.J.; Leyland, K.S.

    1995-01-01

    In the UK, concern over the safety issues associated with nuclear power generation resulted in a demand for a public inquiry into the construction and operation of Sizewell ''B'', Britain's first PWR. This public inquiry was additional to the UK's normal licensing process. The onus was placed upon the UK utility, CEGB (now Nuclear Electric plc) to provide evidence to the inquiry to support the case that the plant would be constructed and operated to a sufficiently high standard of safety. Part of the evidence to the inquiry (1) relied upon the ability of ultrasonic inspections to verify that the reactor pressure vessel and other safety critical components (collectively known as IoF components), were free from defects that could threaten structural integrity. At that time, the body of evidence showed that although ultrasonic inspection had the potential to satisfy this requirement, it would be necessary to validate the procedures and key operators used in order to provide assurance that they were adequate. Inspection validation therefore became an integral part of the UK PWR nuclear power program

  20. Operational inspections

    International Nuclear Information System (INIS)

    Bystersky, M.

    1997-01-01

    Special equipment is described, designed for inspection of reactor pressure vessels performed from the inside. Central shaft manipulator ZMM-5 is available for crack detection control using ultrasound and eddy currents, for visual check of surfaces, repair works at the reactor pressure vessel, and hardness measurements. The manipulator consists of the manipulator bridge, a cable container, shaft segments, a control mechanism and auxiliary parts. Eight inspections were performed at the Bohunice nuclear power plant and two at the Paks nuclear power plant. (M.D.)

  1. Experience on inspection at PFPF

    International Nuclear Information System (INIS)

    Aoki, I.; Yamamoto, Y.; Takahashi, Saburo; Ooshima, Hirofumi; Kuniyasu, Kazufusa.

    1993-01-01

    In order to reduce a personal radiation exposure, Plutonium Fuel Production Facility (PFPF) introduced an automated MOX fabrication technology. Safeguards system for the PFPF was designed and installed so as to be compatible with automated process operation as much as possible. Introduction of these system in PFPF made possible to do the inspection measurements with unattended mode and Near Real Time Material Accountancy (NRTA), consequently inspection has been carrying out effectively and efficiently. This paper describes the new Inspection activities as a comparison with old Inspection activities based on our experience. (author)

  2. 7 CFR 927.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... WASHINGTON Order Regulating Handling Inspection § 927.60 Inspection and certification. (a) Handlers shall ship only fresh pears inspected by the Federal-State Inspection Service or under a program developed by... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 927.60 Section 927.60...

  3. 49 CFR 19.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... described in paragraph (e) of this section are automatically waived (i.e., recipients need not obtain such... exceed the needs of the recipient for the project period by more than $5,000 or five percent of the...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  4. 76 FR 27381 - Proposed Information Collection (Notice of Waiver of VA Compensation or Pension To Receive...

    Science.gov (United States)

    2011-05-11

    ... waive VA benefits for the number of days equal to the number of days in which they received training pay... of Waiver of VA Compensation or Pension To Receive Military Pay and Allowances) Activity; Comment... currently approved collection, and allow 60 days for public comment in response to the notice. This notice...

  5. ROBOTIC TANK INSPECTION END EFFECTOR

    International Nuclear Information System (INIS)

    Rachel Landry

    1999-01-01

    The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related sub-tasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these sub-tasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these sub-tasks were derived from the original intent

  6. International cooperation in production inspections

    International Nuclear Information System (INIS)

    Limousin, S.

    2009-01-01

    Nuclear pressure equipment, like the reactor pressure vessel or steam generators, are manufactured in many countries all around the world. As only few reactors were built in the 90's, most of the nuclear safety authorities have lost part of their know how in component manufacturing oversight. For these two reasons, vendor inspection is a key area for international cooperation. On the one hand, ASN has bilateral relationships with several countries (USA, Finland, China...) to fulfill specific purposes. On the other hand, ASN participates in international groups like the MDEP ( Multinational Design Evaluation Program). A MDEP working group dedicated to vendor inspection cooperation enables exchanges of informations (inspection program plan, inspection findings...) among the regulators. Join inspections are organized. International cooperation could lead in the long term to an harmonization of regulatory practices. (author)

  7. How to share inspection practices internationally?

    International Nuclear Information System (INIS)

    Zerger, B.

    2009-01-01

    ASN strives to share practices with its foreign counterparts in order to develop and adopt best practice worldwide. With regard to inspection practices, the exchanges are made with AEN, in particular within the context of the Working Group on Inspection Practices (WGIP). As well as being very rewarding, the exchanges sometimes come up against marked differences in terms of inspection organisation and even in the meaning given to the inspections. The WGIP endeavors, however, to make inspection practice recommendations that are as functional and feasible as possible. (author)

  8. Towards formalization of inspection using petrinets

    International Nuclear Information System (INIS)

    Javed, M.; Naeem, M.; Bahadur, F.; Wahab, A.

    2014-01-01

    Achieving better quality software has always been a challenge for software developers. Inspection is one of the most efficient techniques, which ensure the quality of software during its development. To the best of our knowledge, current inspection techniques are not realized by any formal approach. In this paper, we propose an inspection technique, which is not only backed by the formal mathematical semantics of Petri nets, but also supports inspecting concurrent processes. We also use a case study of an agent based distributed processing system to demonstrate the inspection of concurrent processes. (author)

  9. Ultrasonic inspection of inpile tubes

    International Nuclear Information System (INIS)

    Boyd, D.M.; Bossi, H.

    1985-01-01

    The in-service inspection (ISI) of inpile tubes can be performed accurately and safely with a semiautomatic ultrasonic inspection system. The ultrasonic technique uses a set of multiple transducers to detect and size cracks, voids, and laminations radially and circumferentially. Welds are also inspected for defects. The system is designed to inspect stainless steel and Inconel tubes ranging from 53.8 mm (2.12 in.) to 101.6 mm (4 in.) inner diameter with wall thickness on the order of 5 mm. The inspection head contains seven transducers mounted in a surface-following device. Six angle-beam transducers generate shear waves in the tubes. Two of the six are oriented to detect circumferential cracks, and two detect axial cracks. Although each of these four transducers is used in the pulse-echo mode, they are oriented in aligned sets so pitch-catch operation is possible if desired. The remaining angle-beam transducers are angulated to detect flaws that are off axial or circumferential orientation. The seventh transducer is used for longitudinal inspection and detects and sizes laminar-type defects

  10. Optimising import phytosanitary inspection

    NARCIS (Netherlands)

    Surkov, I.

    2007-01-01

    Keywords: quarantine pest, plant health policy, optimization, import phytosanitary inspection, ‘reduced checks’, optimal allocation of resources, multinomial logistic regression, the Netherlands World trade is a major vector of spread of quarantine plant pests. Border phytosanitary inspection

  11. Magnetic particle inspection

    Science.gov (United States)

    Sastri, Sankar

    1990-01-01

    The purpose of this experiment is to familiarize the student with magnetic particle inspection and relate it to classification of various defects. Magnetic particle inspection is a method of detecting the presence of cracks, laps, tears, inclusions, and similar discontinuities in ferromagnetic materials such as iron and steel. This method will most clearly show defects that are perpendicular to the magnetic field. The Magnaglo method uses a liquid which is sprayed on the workpiece to be inspected, and the part is magnetized at the same time. The workpiece is then viewed under a black light, and the presence of discontinuity is shown by the formation of a bright indication formed by the magnetic particles over the discontinuity. The equipment and experimental procedures are described.

  12. Ultrasonic inspections of fuel alignment pins

    International Nuclear Information System (INIS)

    Rathgeb, W.; Schmid, R.

    1994-01-01

    As a remedy to the practical problem of defects in fuel alignment pins made of Inconel X750, an inspection technique has been developed which fully meets the requirements of detecting defects. The newly used fuel alignment pins made of austenite are easy to test and therefore satisfy the necessity of further inspections.For the fuel alignment pins of the upper core structure a safe and fast inspection technique was made available. The inspection sensitivity is high and it is possible to give quantitative directions concerning defect orientation and depth. After the required inspections had been concluded in 1989, a total of 18 inspections were carried out in various national and international nuclear power plants in the following years. During this time more than 6000 fuel alignment pines were examined.For the fuel alignment pins the inspection technique provided could increase the understanding of the defect process. This technique contributed to the development of an adaptive and economical repair strategy. ((orig.))

  13. Laser Safety Inspection Criteria

    International Nuclear Information System (INIS)

    Barat, K

    2005-01-01

    A responsibility of the Laser Safety Officer (LSO) is to perform laser safety audits. The American National Standard Z136.1 Safe use of Lasers references this requirement in several sections: (1) Section 1.3.2 LSO Specific Responsibilities states under Hazard Evaluation, ''The LSO shall be responsible for hazards evaluation of laser work areas''; (2) Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''; and (3) Appendix D, under Survey and Inspections, it states, ''the LSO will survey by inspection, as considered necessary, all areas where laser equipment is used''. Therefore, for facilities using Class 3B and or Class 4 lasers, audits for laser safety compliance are expected to be conducted. The composition, frequency and rigueur of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms. In many institutions, a sole Laser Safety Officer (LSO) or a number of Deputy LSO's perform these audits. For that matter, there are institutions that request users to perform a self-assessment audit. Many items on the common audit list and the associated findings are subjective because they are based on the experience and interest of the LSO or auditor in particular items on the checklist. Beam block usage is an example; to one set of eyes a particular arrangement might be completely adequate, while to another the installation may be inadequate. In order to provide more consistency, the National Ignition Facility Directorate at Lawrence Livermore National Laboratory (NIF-LLNL) has established criteria for a number of items found on the typical laser safety audit form. These criteria are distributed to laser users, and they serve two broad purposes: first, it gives the user an expectation of what will be reviewed by an auditor, and second, it is an

  14. PWR vessel inspection performance improvements

    International Nuclear Information System (INIS)

    Blair Fairbrother, D.; Bodson, Francis

    1998-01-01

    A compact robot for ultrasonic inspection of reactor vessels has been developed that reduces setup logistics and schedule time for mandatory code inspections. Rather than installing a large structure to access the entire weld inspection area from its flange attachment, the compact robot examines welds in overlapping patches from a suction cup anchor to the shell wall. The compact robot size allows two robots to be operated in the vessel simultaneously. This significantly reduces the time required to complete the inspection. Experience to date indicates that time for vessel examinations can be reduced to fewer than four days. (author)

  15. Employing innovative techniques to reduce inspection times

    International Nuclear Information System (INIS)

    Heumueller, R.; Guse, G.; Dirauf, F.; Fischer, E.

    1997-01-01

    Shorter inspection periods mean lower revision costs and less tight revision schedules, but must not detract from the quality of inspection findings. This requirement imposes upon the company performing the inspection the need for top achievements both in quality management and in the use of innovative techniques. Flexible equipment systems and inspection techniques adapted to specific purposes are able to reduce inspection times in many inspection jobs. As part of a complete system designed to reduce inspection times, the new Saphir (Siemens Alok Phased Array Integrated Reliable UT-System) inspection equipment system is the core of most of the recent innovations. Being an integrated inspection equipment system, it is able to handle conventional US probes as well as arrays and phased arrays. It is open for further matching to specific inspection and administrative requirements and developments, and it may be incorporated in the network of an integrated system with a database. A technological leap in probe design in the past few years has allowed controllable wave fields to be generated which are in no way inferior to those of conventional probes with fixed angles of incidence. In this way, a number of inspection techniques can be implemented with a single probe. This reduces inspection times, setup and retooling times, and doses. Typical examples already used in practice are the LLT (longitudinal-longitudinal-transverse waves) technique and the integration of inspections for longitudinal and transverse defects in a single run. In the near future, surfaces with complicated curvatures will be inspected by novel modular robot systems consisting of individual modules of linear axes and rotational axes. (orig.) [de

  16. Military Use of Drugs Not Yet Approved by the FDA for CW/BW Defense. Lessons from the Gulf War

    National Research Council Canada - National Science Library

    Rettig, Richard

    1998-01-01

    .... It deals with the Interim Rule, adopted in December 1990, which established the authority of the Commissioner of Food and Drugs to waive informed consent for using investigational drugs in certain...

  17. Development of Pre-Service and In-Service Information Management System (iSIMS)

    International Nuclear Information System (INIS)

    Yoo, H. J.; Choi, S. N.; Kim, H. N.; Kim, Y. H.; Yang, S. H.

    2004-01-01

    The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro and Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS

  18. Development of Pre-Service and In-Service Information Management System (iSIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, H. J.; Choi, S. N.; Kim, H. N.; Kim, Y. H.; Yang, S. H. [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2004-08-15

    The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro and Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS

  19. Automated PCB Inspection System

    Directory of Open Access Journals (Sweden)

    Syed Usama BUKHARI

    2017-05-01

    Full Text Available Development of an automated PCB inspection system as per the need of industry is a challenging task. In this paper a case study is presented, to exhibit, a proposed system for an immigration process of a manual PCB inspection system to an automated PCB inspection system, with a minimal intervention on the existing production flow, for a leading automotive manufacturing company. A detailed design of the system, based on computer vision followed by testing and analysis was proposed, in order to aid the manufacturer in the process of automation.

  20. Nuclear Technology. Course 30: Mechanical Inspection. Module 30-6, Protective Coating Inspection.

    Science.gov (United States)

    Espy, John

    This sixth in a series of eight modules for a course titled Mechanical Inspection describes the duties of the nuclear quality assurance/quality control technician that are associated with protective coatings, and the national standards that govern the selection, application, and inspection of protective coatings for the reactor containment…

  1. Evaluating Heuristics for Planning Effective and Efficient Inspections

    Science.gov (United States)

    Shull, Forrest J.; Seaman, Carolyn B.; Diep, Madeline M.; Feldmann, Raimund L.; Godfrey, Sara H.; Regardie, Myrna

    2010-01-01

    A significant body of knowledge concerning software inspection practice indicates that the value of inspections varies widely both within and across organizations. Inspection effectiveness and efficiency can be measured in numerous ways, and may be affected by a variety of factors such as Inspection planning, the type of software, the developing organization, and many others. In the early 1990's, NASA formulated heuristics for inspection planning based on best practices and early NASA inspection data. Over the intervening years, the body of data from NASA inspections has grown. This paper describes a multi-faceted exploratory analysis performed on this · data to elicit lessons learned in general about conducting inspections and to recommend improvements to the existing heuristics. The contributions of our results include support for modifying some of the original inspection heuristics (e.g. Increasing the recommended page rate), evidence that Inspection planners must choose between efficiency and effectiveness, as a good tradeoff between them may not exist, and Identification of small subsets of inspections for which new inspection heuristics are needed. Most Importantly, this work illustrates the value of collecting rich data on software Inspections, and using it to gain insight into, and Improve, inspection practice.

  2. Evaluation of Pre-marketing Factors to Predict Post-marketing Boxed Warnings and Safety Withdrawals.

    Science.gov (United States)

    Schick, Andreas; Miller, Kathleen L; Lanthier, Michael; Dal Pan, Gerald; Nardinelli, Clark

    2017-06-01

    An important goal in drug regulation is understanding serious safety issues with new drugs as soon as possible. Achieving this goal requires us to understand whether information provided during the Food and Drug Administration (FDA) drug review can predict serious safety issues that are usually identified after the product is approved. However, research on this topic remains understudied. In this paper, we examine whether any pre-marketing drug characteristics are associated with serious post-marketing safety actions. We study this question using an internal FDA database containing every new small molecule drug submitted to the FDA's Center for Drug Evaluation and Research (CDER) on or after November 21, 1997, and approved and commercially launched before December 31, 2009. Serious post-marketing safety actions include whether these drugs ever experienced either a post-marketing boxed warning or a withdrawal from the market due to safety concerns. A random effects logistic regression model was used to test whether any pre-marketing characteristics were associated with either post-marketing safety action. A total of 219 new molecular entities were analyzed. Among these drugs, 11 experienced a safety withdrawal and 30 received boxed warnings by July 31, 2016. Contrary to prevailing hypotheses, we find that neither clinical trial sample sizes nor review time windows are associated with the addition of a post-marketing boxed warning or safety withdrawal. However, we do find that new drugs approved with either a boxed warning or priority review are more likely to experience post-marketing boxed warnings. Furthermore, drugs approved with boxed warnings tend to receive post-marketing boxed warnings resulting from new safety information that are unrelated to the original warning. Drugs approved with a boxed warning are 3.88 times more likely to receive a post-marketing boxed warning, while drugs approved with a priority review are 3.51 times more likely to receive a post

  3. 78 FR 12323 - Announcement of the Re-Approval of the Commission on Office Laboratory Accreditation (COLA) as an...

    Science.gov (United States)

    2013-02-22

    ... subspecialty areas under CLIA: Microbiology, including Bacteriology, Mycobacteriology, Mycology, Parasitology... CLIA for the following specialties and subspecialties: Microbiology, including Bacteriology... requirements. The COLA requires the laboratory director to review quality control results for waived tests...

  4. INSPECT: a package of computer programs for planning and evaluating safeguards inspections

    International Nuclear Information System (INIS)

    Mullen, M.F.

    1980-01-01

    As part of the US Program of Technical Assistance to IAEA Safeguards, PNL has developed a package of computer programs, called INSPECT, that can be used in planning and evaluating safeguards inspections of various types of nuclear facilities. The programs are based on the statistical methods described in Part F of the IAEA Safeguards Technical Manual and can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, and a measure of the effectiveness of the inspection plan. The paper describes the programs, reviews a number of applications, and indicates areas for future work

  5. Reliability-Based Inspection Planning for Structural Systems

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    1993-01-01

    A general model for reliability-based optimal inspection and repair strategies for structural systems is described. The total expected costs in the design lifetime is minimized with the number of inspections, the inspection times and efforts as decision variables. The equivalence of this model...... with a preposterior analysis from statistical decision theory is discussed. It is described how information obtained by an inspection can be used in a repair decision. Stochastic models for inspection, measurement and repair actions are presented. The general model is applied for inspection and repair planning...

  6. New Swedish regulations in the area of plant inspection and in-service inspection

    International Nuclear Information System (INIS)

    Hansson, B.

    1998-01-01

    History and present status od Swedish regulations in the field of NPP inspection and in-service inspection are described. The presentation focuses on the development of regulations and establishing new ones. A description of different organisations involved is included

  7. 9 CFR 381.67 - Young chicken and squab slaughter inspection rate maximums under traditional inspection procedure.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Young chicken and squab slaughter... INSPECTION REGULATIONS Operating Procedures § 381.67 Young chicken and squab slaughter inspection rate... inspector per minute under the traditional inspection procedure for the different young chicken and squab...

  8. 7 CFR 57.925 - Inspection of imported eggs.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Inspection of imported eggs. 57.925 Section 57.925... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG PRODUCTS INSPECTION ACT) Regulations Governing the Inspection of Eggs Imports § 57.925 Inspection of...

  9. 46 CFR 107.211 - Original Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Original Certificate of Inspection. 107.211 Section 107... INSPECTION AND CERTIFICATION Inspection and Certification § 107.211 Original Certificate of Inspection. (a) The owner or builder of a unit applies for an inspection for an original Certificate of Inspection by...

  10. 9 CFR 381.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 381.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Canning and Canned Products § 381.309...

  11. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  12. Robotic inspection technology-process an toolbox

    Energy Technology Data Exchange (ETDEWEB)

    Hermes, Markus [ROSEN Group (United States). R and D Dept.

    2005-07-01

    Pipeline deterioration grows progressively with ultimate aging of pipeline systems (on-plot and cross country). This includes both, very localized corrosion as well as increasing failure probability due to fatigue cracking. Limiting regular inspecting activities to the 'scrapable' part of the pipelines only, will ultimately result into a pipeline system with questionable integrity. The confidence level in the integrity of these systems will drop below acceptance levels. Inspection of presently un-inspectable sections of the pipeline system becomes a must. This paper provides information on ROSEN's progress on the 'robotic inspection technology' project. The robotic inspection concept developed by ROSEN is based on a modular toolbox principle. This is mandatory. A universal 'all purpose' robot would not be reliable and efficient in resolving the postulated inspection task. A preparatory Quality Function Deployment (QFD) analysis is performed prior to the decision about the adequate robotic solution. This enhances the serviceability and efficiency of the provided technology. The word 'robotic' can be understood in its full meaning of Recognition - Strategy - Motion - Control. Cooperation of different individual systems with an established communication, e.g. utilizing Bluetooth technology, support the robustness of the ROSEN robotic inspection approach. Beside the navigation strategy, the inspection strategy is also part of the QFD process. Multiple inspection technologies combined on a single carrier or distributed across interacting container must be selected with a clear vision of the particular goal. (author)

  13. Inspection of NFT-type cask fabrication

    International Nuclear Information System (INIS)

    Takani, M.; Umegaki, O.

    1998-01-01

    NFT-type cask has been developed to transport the high burn-up spent fuel from Japanese nuclear power stations to the reprocessing plant of Japan Nuclear Fuel Limited which is under construction in Rokkasho-mura, Aomori prefecture. NFT placed orders of 53 casks to 5 fabricators in Japan and overseas, and these casks have been fabricated since 1994. There are two types of NFT-type casks for PWR spent fuel and four types of NFT-type cask for BWR spent fuel. These are designed in consideration of the number of spent fuels accommodated into each type of casks and the handling conditions at domestic nuclear power stations. According to Japanese notification, it is required to be confirmed by competent authority that casks are manufactured in accordance with approved designs. Furthermore, additional tests are performed such as through-gauge test for basket and pressure test on the shielding material space to ensure the performance of cask by NFT other than items inspected by the competent authority. In order to enhance maintainability of casks, replacement parts such as bolts and valves are shared as much as possible. (authors)

  14. Inspections - a cost effective approach

    International Nuclear Information System (INIS)

    Joseph, C.

    1981-01-01

    This paper describes a cost effective approach for inspections of Computerized Nuclear Materials Control and Accounting Systems (CNMCAS). Highlighted is the capability to conduct an inspection program via portable telephone terminals from off-site locations. The program can be applied to various materials management functions including materials control, quality assurance, and materials accounting. The system is designed to facilitate inspections by both external and internal groups

  15. Can non-destructive inspection be reliable

    International Nuclear Information System (INIS)

    Silk, M.G.; Stoneham, A.M.; Temple, J.A.G.

    1988-01-01

    The paper on inspection is based on the book ''The reliability of non-destructive inspection: assessing the assessment of structures under stress'' by the present authors (published by Adam Hilger 1987). Emphasis is placed on the reliability of inspection and whether cracks in welds or flaws in components can be detected. The need for non-destructive testing and the historical attitudes to non-destructive testing are outlined, along with the case of failure. Factors influencing reliable inspection are discussed, and defect detection trials involving round robin tests are described. The development of reliable inspection techniques and the costs of reliability and unreliability are also examined. (U.K.)

  16. Development of radioactive materials inspection system

    International Nuclear Information System (INIS)

    Yang Lu; Wang Guobao; Chen Yuhua; Li Latu; Zhang Sujing

    2005-01-01

    Radioactive materials inspection system which is applied to inspect the horror activities of radioactive materials and its illegal transfer. The detector sections are made of highly stable and credible material. It has high sensitivity to radioactive materials. The inspect lowest limit of inspection is the 2-3 times to the background, the energy range is 30 keV-2.5 MeV and the response time is 0.5 s. Inspection message can be transmitted through wired or wireless web to implement remote control. The structure of the system is small, light and convenient. It is ideal for protecting society and public from the harm of the radiation. (authors)

  17. Microtopographic characterization of pre-colonial Brazilian archaeological ceramics

    Science.gov (United States)

    Costa, Manuel F. M.; Magalhaes, Wagner; Alves, Márcia A.

    2015-06-01

    Optics and optics and photonics based inspection tools and methods had expensively proven their invaluable importance in the preservation of cultural heritage and artwork. The non-invasive inspection of the 3D shape of objects and of the micro-relief structure of its surfaces can be of high importance in the characterization process required in most works of restoration or preservation of archeological artwork. In this communication we will report on the non-invasive optical microtopographic characterization of the surface of pre-colonial ceramics and pottery of hunter-recollector-farmer' tribes of the Paranaiba valley in Minas Gerais, Brazil. The pottery found is decorated with incisions with different geometric distributions and levels of complexity corresponding to two periods of indigenous Indian occupations: one from a period dated at 1,095 +/- 186 years ago and another of the early nineteenth century dated between 212 +/- 19 years and 190 +/- 30 years ago seemingly corresponding to the occupation of the territory by southern Kayapós tribes.

  18. 9 CFR 318.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 318.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... Canning and Canned Products § 318.309 Finished product inspection. (a) Finished product inspections must...

  19. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  20. Japanese regulatory practices on licensing, inspection, operational supervision and related standards

    International Nuclear Information System (INIS)

    Tatsuta, Yoshinori

    1991-01-01

    Japanese view on the safety of nuclear power plants is based on the concept that the primary responsibility for securing safety lies on electric power companies, installers of reactors. Under this concept, the Ministry of International Trade and Industry (MITI), in the course of designing and construction, has been performed an examination of the basic design and the detailed design of nuclear power plants, and in each stage of construction, a pre-operational inspection process. In addition, MITI, in operating stage, has been made throughgoing investigations on the cases of troubles and incidents as well as accidents that may affect operation, forcing utilities to take measures to prevent recurrence, and implementing safety regulation based on the 'preventive maintenance' including elaborate checkings and overhaulings at the periodical inspections conducted for a period of three to four months after every 12-month operation cycle under the laws and regulations. This paper discusses the current status of nuclear power development in Japan, safety regulatory systems, views on safety and future prospects of securing safety. (orig.)

  1. Runway Inspection by RPAS

    Directory of Open Access Journals (Sweden)

    Stanislav Absolon

    2015-10-01

    Full Text Available This article discusses the use of the RPAS for the inspection of the airport operating areas. The paper compares the current process of the inspection of the airport operating areas by the airport staff with the possibilities which are offered by the use of the modern technology RPAS. The following text also describes how to inspect airport operating areas by the RPAS, specific technical possibilities and the applicable technical solutions. Furthermore there are variants of piloting the RPAS, comparing usable equipment, equipment for video recording and the possibility of using thermal imaging camera in the article.

  2. Non-destructive inservice inspections

    International Nuclear Information System (INIS)

    Kauppinen, P.; Sarkimo, M.; Lahdenperae, K.

    1998-01-01

    In order to assess the possible damages occurring in the components and structures of operating nuclear power plants during service the main components and structures are periodically inspected by non-destructive testing techniques. The reliability of non-destructive testing techniques applied in these inservice inspections is of major importance because the decisions concerning the needs for repair of components are mainly based on the results of inspections. One of the targets of this research program has been to improve the reliability of non-destructive testing. This has been addressed in the sub-projects which are briefly summarised here. (author)

  3. The Role of the Inspector during an Emergency. Addendum to the Inspection of Emergency Arrangements [NEA/CNRA/R(2013)2

    International Nuclear Information System (INIS)

    Veyret, Olivier; Kupila, Jukka

    2015-06-01

    A fundamental goal in a regulatory authority's oversight of nuclear facilities is to establish confidence that adequate arrangements are in place for emergency preparedness and response. The CNRA published a report in 1998 on the inspection of licensee activities in emergency planning [NEA/CNRA/R(98)2]. Significant changes have occurred in the interim period, including early lessons learnt from the Fukushima accident. Therefore, the WGIP determined that it would be prudent for member countries to share good inspection practices associated with emergency arrangements (preparedness and response) in an updated report. In December 2013, the WGIP therefore presented the report entitled Inspection of Emergency Arrangements [NEA/CNRA/R(2013)2] for CNRA approval. While the report was approved at the December 2013 CNRA meeting, members requested that a short addendum be developed to compile member countries experiences of the role of the inspector during an emergency. The present addendum to NEA/CNRA/R(2013)2 identifies six additional commendable practices. The WGIP generated a questionnaire to address aspects of the role of the inspector during an emergency. Details of the questions posed to WGIP members are set out in Section 3 of this report. The following twenty countries responded to the questionnaire: Belgium, Canada, Czech Republic, Finland, France, Germany, India, Italy, Japan, Korea, Mexico, the Netherlands, Russia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, United Kingdom and United States. The WGIP members were requested to response concisely to the two main questions in the questionnaire. Appendix A provides the detailed responses to the questions. Appendix B includes supplementary information provided by several countries. An analysis of WGIP members' responses is presented in Section 4 of this report and conclusions are presented in Section 5

  4. 9 CFR 355.7 - Inauguration of inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inauguration of inspection. 355.7 Section 355.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  5. Developing the information management system for safeguards national inspection

    International Nuclear Information System (INIS)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S.

    2003-01-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection

  6. In-service inspection of pressurized water reactors

    International Nuclear Information System (INIS)

    Rapin, M.; Saglio, R.

    1983-01-01

    French legislation, which is more demanding than in other countries, had led Electricite de France, the State-owned utility, to acquire better performance in-service inspection facilities than those which existed previously. This fact has spurred the industrial development of the new technical facilities which are used worldwide today. This article presents the ''in-service inspection machine'' (MIS) for the inspection of the welds of a PWR vessel, and the inspection device of steam generator tubes; the MIS allow a remote-viewing, ultrasonic and gamma-graphic inspection; Foucault currents are the only one method adapted to the inspection steam generator tubes [fr

  7. ITER In-Cryostat inspection and repair feasibility studies

    International Nuclear Information System (INIS)

    Reich, J.; Cordier, J.-J.; Houtte, D. van; Evrard, D.; Mercier, E.; Popa, T.; Doshi, B.

    2011-01-01

    The ITER In-Cryostat maintenance study is an important precondition to guarantee the operation over the ITER lifetime. The ITER operation is subdivided mainly into two phases: 1.Hydrogen phase (non-nuclear operation phase). 2.Deuterium/Tritium phase (nuclear DT phase). The commissioning phase includes the initial phase of assembly. Within the first phase the ITER components will be tested; afterwards they will go into operation. The In-Cryostat maintenance shall facilitate all operations that could be required by In-Cryostat systems and the Cryostat itself. In cases of failures or unlikely events (e.g. earthquakes) it is necessary to provide man and tool access to In-Cryostat components. Overall functions which have to be implemented are: ·Inspection of components including leak localization (helium, water, air). ·Repair and replacement of component (instrumentation, parts or complete components). ·Regulatory inspections. It is presumed that most of component failure would occur at the beginning of the operational phase. This failure rate is expected to be very unlikely when ITER is being operating during the nuclear phase. For maintenance activities it is assumed that: ·The intervention frequency on each component is limited during its lifetime (e.g. inspections/repair during global shutdown). ·Most of these interventions will be required during the inactive phase. According to ALARA (As Low as Reasonable Achievable) rules maintenance activities will be planned in order to minimize the required human interventions during the active phase. Different tools have to be designed to perform the maintenance actions. As there are quiet all heavy components to be handled and removed, humans cannot perform the work without semi hands-on tools. The required permanent fixtures and tools are considered and pre-designed.

  8. ITER In-Cryostat inspection and repair feasibility studies

    Energy Technology Data Exchange (ETDEWEB)

    Reich, J., E-mail: Jens.Reich@iter.org [ITER Organization, CS 90 046, 13115 St Paul lez Durance Cedex (France); Cordier, J.-J.; Houtte, D. van [ITER Organization, CS 90 046, 13115 St Paul lez Durance Cedex (France); Evrard, D. [Sogeti High Tech, 180 rue Rene Descartes, 13857 Aix en Provence (France); Mercier, E. [AREVA CNIM KAH System Engineering Support, CS 50497, 13593 Aix en Provence Cedex 3 (France); Popa, T.; Doshi, B. [ITER Organization, CS 90 046, 13115 St Paul lez Durance Cedex (France)

    2011-10-15

    The ITER In-Cryostat maintenance study is an important precondition to guarantee the operation over the ITER lifetime. The ITER operation is subdivided mainly into two phases: 1.Hydrogen phase (non-nuclear operation phase). 2.Deuterium/Tritium phase (nuclear DT phase). The commissioning phase includes the initial phase of assembly. Within the first phase the ITER components will be tested; afterwards they will go into operation. The In-Cryostat maintenance shall facilitate all operations that could be required by In-Cryostat systems and the Cryostat itself. In cases of failures or unlikely events (e.g. earthquakes) it is necessary to provide man and tool access to In-Cryostat components. Overall functions which have to be implemented are: {center_dot}Inspection of components including leak localization (helium, water, air). {center_dot}Repair and replacement of component (instrumentation, parts or complete components). {center_dot}Regulatory inspections. It is presumed that most of component failure would occur at the beginning of the operational phase. This failure rate is expected to be very unlikely when ITER is being operating during the nuclear phase. For maintenance activities it is assumed that: {center_dot}The intervention frequency on each component is limited during its lifetime (e.g. inspections/repair during global shutdown). {center_dot}Most of these interventions will be required during the inactive phase. According to ALARA (As Low as Reasonable Achievable) rules maintenance activities will be planned in order to minimize the required human interventions during the active phase. Different tools have to be designed to perform the maintenance actions. As there are quiet all heavy components to be handled and removed, humans cannot perform the work without semi hands-on tools. The required permanent fixtures and tools are considered and pre-designed.

  9. A locomotive inspection robot for turbine building interior inspection in nuclear power plants

    International Nuclear Information System (INIS)

    Obama, M.; Ozaki, F.; Asano, K.

    1985-01-01

    A locomotive inspection robot, named Turbine Building Inspection System (TBIS), has been developed for turbine building interior inspections in nuclear power plants. This robot is made up of a vehicle, a telescopic support, turning head and a multijoint arm which has dual TV cameras and a diagnostic rod on its tip. The multijoint arm has 17 degrees of freedom and its length is 243 cm. Minimum and maximum heights for the multijoint arm shoulder are 1.5 meter and 4 meters respectively. The total degree of freedom in the combination of the multijoint arm, turning head and telescopic support is 19 and the area, it is capable of inspecting, is equal to the cylindrical dome whose height and diameter are 6.4 meters and 4.8 meters respectively. The design philosophy, hardware structure and operation method of the TBIS are described. 2 refs.; 10 figs

  10. Wafer plane inspection for advanced reticle defects

    Science.gov (United States)

    Nagpal, Rajesh; Ghadiali, Firoz; Kim, Jun; Huang, Tracy; Pang, Song

    2008-05-01

    Readiness of new mask defect inspection technology is one of the key enablers for insertion & transition of the next generation technology from development into production. High volume production in mask shops and wafer fabs demands a reticle inspection system with superior sensitivity complemented by a low false defect rate to ensure fast turnaround of reticle repair and defect disposition (W. Chou et al 2007). Wafer Plane Inspection (WPI) is a novel approach to mask defect inspection, complementing the high resolution inspection capabilities of the TeraScanHR defect inspection system. WPI is accomplished by using the high resolution mask images to construct a physical mask model (D. Pettibone et al 1999). This mask model is then used to create the mask image in the wafer aerial plane. A threshold model is applied to enhance the inspectability of printing defects. WPI can eliminate the mask restrictions imposed on OPC solutions by inspection tool limitations in the past. Historically, minimum image restrictions were required to avoid nuisance inspection stops and/or subsequent loss of sensitivity to defects. WPI has the potential to eliminate these limitations by moving the mask defect inspections to the wafer plane. This paper outlines Wafer Plane Inspection technology, and explores the application of this technology to advanced reticle inspection. A total of twelve representative critical layers were inspected using WPI die-to-die mode. The results from scanning these advanced reticles have shown that applying WPI with a pixel size of 90nm (WPI P90) captures all the defects of interest (DOI) with low false defect detection rates. In validating CD predictions, the delta CDs from WPI are compared against Aerial Imaging Measurement System (AIMS), where a good correlation is established between WPI and AIMSTM.

  11. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  12. Developing the information management system for safeguards national inspection

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection.

  13. Thermographic inspection of pipes, tanks, and containment liners

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, Jeremy B., E-mail: jrenshaw@epri.com; Muthu, Nathan [Electric Power Research Institute, 1300 West WT Harris Blvd., Charlotte, NC 28262 (United States); Lhota, James R.; Shepard, Steven M., E-mail: sshepard@thermalwave.com [Thermal Wave Imaging, 845 Livernois St., Ferndale, MI 48220 (United States)

    2015-03-31

    Nuclear power plants are required to operate at a high level of safety. Recent industry and license renewal commitments aim to further increase safety by requiring the inspection of components that have not traditionally undergone detailed inspected in the past, such as tanks and liners. NEI 09-14 requires the inspection of buried pipes and tanks while containment liner inspections are required as a part of license renewal commitments. Containment liner inspections must inspect the carbon steel liner for defects - such as corrosion - that could threaten the pressure boundary and ideally, should be able to inspect the surrounding concrete for foreign material that could be in contact with the steel liner and potentially initiate corrosion. Such an inspection requires a simultaneous evaluation of two materials with very different material properties. Rapid, yet detailed, inspection results are required due to the massive size of the tanks and containment liners to be inspected. For this reason, thermal NDE methods were evaluated to inspect tank and containment liner mockups with simulated defects. Thermographic Signal Reconstruction (TSR) was utilized to enhance the images and provide detailed information on the sizes and shapes of the observed defects. The results show that thermographic inspection is highly sensitive to the defects of interest and is capable of rapidly inspecting large areas.

  14. 7 CFR 75.21 - Grain sample inspection.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Grain sample inspection. 75.21 Section 75.21... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Inspection § 75.21 Grain sample inspection. A sample inspection shall be performed by examining official grain samples received from FGIS to...

  15. 7 CFR 868.44 - New original inspection.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false New original inspection. 868.44 Section 868.44... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Original Inspection Service § 868.44 New original... applicant may request a new original inspection on any previously inspected lot; except that a new original...

  16. 49 CFR 396.13 - Driver inspection.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS INSPECTION, REPAIR, AND MAINTENANCE § 396.13 Driver inspection. Before driving a motor vehicle, the driver shall: (a) Be satisfied that the motor vehicle is in safe operating condition; (b) Review the last driver vehicle inspection...

  17. Do school inspections improve primary school performance?

    OpenAIRE

    Dinand Webbink; Rob Luginbuhl; I. de Wolf

    2007-01-01

    Inspectors from the Dutch Inspectorate of Education inspect primary schools, write inspection reports on each inspected school, and make recommendations as to how each school can improve. We test whether these inspections result in better school performance. Using a fixed-effects model, we find evidence that school inspections do lead to measurably better school performance. Our assessment of school performance is based on the Cito test scores of pupils in their final year of primary school. ...

  18. Travelling type monitoring and inspection device

    International Nuclear Information System (INIS)

    Ito, Takao; Maruki, Hideaki.

    1994-01-01

    The present invention sufficiently ensures video output images even if lenses of a television camera of a monitoring means are degraded to reduce the quantity of transmission light. That is, a light amount control mechanism capable of controlling the quantity of illumination light irradiated from an illumination device at an output level of a sensor of an inspection device main body. A test chart for measuring a luminance which is an output level of the sensor is disposed. During plant operation, the lenses of the television camera undergo influences of radioactivity and are degraded to reduce the quantity of transmission light on every periodical monitoring and inspection using a travelling type monitoring inspection device. In this case, the test chart disposed near the equipment to be monitored and inspected is caught by the television camera to measure a sensor output luminance. Then, the light amount control mechanism of the illumination device is controlled so as to provide a luminance which has been set at an initial stage of the plant inspection. With such procedures, video data of the objective equipment to be monitored and inspected can be obtained at a constant luminance during inspection. (I.S.)

  19. Magnetic rubber inspection (MRI)

    International Nuclear Information System (INIS)

    Carro, L.

    1997-01-01

    Magnetic Rubber Inspection (MRI) was developed to inspect for small cracks and flaws encountered in high performance aircraft. A formula of very fine magnetic particles immersed in a room temperature curing rubber is catalysed and poured into dams (retainers) on the surface of the part to be inspected. Inducing a magnetic field then causes the particles to be drawn to discontinuities in the component under test. These indicating particles are held to the discontinuity by magnetic attraction, as the rubber cures. The solid rubber cast (Replica) is then removed and examined under a microscope for indicating lines of particle concentrations. 3 refs., 6 figs

  20. 29 CFR 1960.31 - Inspections by OSHA.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Inspections by OSHA. 1960.31 Section 1960.31 Labor... MATTERS Inspection and Abatement § 1960.31 Inspections by OSHA. (a) The Secretary or the Secretary's... scheduled inspections as an integral part of OSHA's evaluation of an agency's safety and health program in...

  1. Inspection and verification of waste packages for near surface disposal

    International Nuclear Information System (INIS)

    2000-01-01

    Extensive experience has been gained with various disposal options for low and intermediate level waste at or near surface disposal facilities. Near surface disposal is based on proven and well demonstrated technologies. To ensure the safety of near surface disposal facilities when available technologies are applied, it is necessary to control and assure the quality of the repository system's performance, which includes waste packages, engineered features and natural barriers, as well as siting, design, construction, operation, closure and institutional controls. Recognizing the importance of repository performance, the IAEA is producing a set of technical publications on quality assurance and quality control (QA/QC) for waste disposal to provide Member States with technical guidance and current information. These publications cover issues on the application of QA/QC programmes to waste disposal, long term record management, and specific QA/QC aspects of waste packaging, repository design and R and D. Waste package QA/QC is especially important because the package is the primary barrier to radionuclide release from a disposal facility. Waste packaging also involves interface issues between the waste generator and the disposal facility operator. Waste should be packaged by generators to meet waste acceptance requirements set for a repository or disposal system. However, it is essential that the disposal facility operator ensure that waste packages conform with disposal facility acceptance requirements. Demonstration of conformance with disposal facility acceptance requirements can be achieved through the systematic inspection and verification of waste packages at both the waste generator's site and at the disposal facility, based on a waste package QA/QC programme established by the waste generator and approved by the disposal operator. However, strategies, approaches and the scope of inspection and verification will be somewhat different from country to country

  2. Container Inspection Utilizing 14 MeV Neutrons

    Science.gov (United States)

    Valkovic, Vladivoj; Sudac, Davorin; Nad, Karlo; Obhodas, Jasmina

    2016-06-01

    A proposal for an autonomous and flexible ship container inspection system is presented. This could be accomplished by the incorporation of an inspection system on various container transportation devices (straddle carriers, yard gentry cranes, automated guided vehicles, trailers). The configuration is terminal specific and it should be defined by the container terminal operator. This enables that no part of the port operational area is used for inspection. The inspection scenario includes container transfer from ship to transportation device with the inspection unit mounted on it. The inspection is performed during actual container movement to the container location. A neutron generator without associated alpha particle detection is used. This allows the use of higher neutron intensities (5 × 109 - 1010 n/s in 4π). The inspected container is stationary in the “inspection position” on the transportation device while the “inspection unit” moves along its side. The following analytical methods will be used simultaneously: neutron radiography, X-ray radiography, neutron activation analysis, (n, γ) and (n,n'γ) reactions, neutron absorption. and scattering, X-ray backscattering. The neutron techniques will utilize “smart collimators” for neutrons and gamma rays, both emitted and detected. The inspected voxel is defined by the intersection of the neutron generator and the detectors solid angles. The container inspection protocol is based on identification of discrepancies between the cargo manifest, elemental “fingerprint” and radiography profiles. In addition, the information on container weight is obtained during the container transport and screening by measuring of density of material in the container.

  3. Extension of the pre-retirement programmes

    CERN Document Server

    Human Resources Department

    2011-01-01

    Following recommendation by the Standing Concertation Committee and approval by the Director-General, please note that: the Progressive Retirement Programme has been extended by one year, from 1 April 2011 until 31 March 2012; and the Part-Time Work as a Pre-retirement Measure has also been extended by one year, from 1 January 2011 until 31 December 2011. Further information is available from the following sites: https://cern.ch/admin-eguide/retraite/proc_prp.asp https://cern.ch/admin-eguide/retraite/proc_pTp.asp Tel. 73903

  4. Attitude towards working in rural areas: a cross-sectional survey of rural-oriented tuition-waived medical students in Shaanxi, China.

    Science.gov (United States)

    Liu, Jinlin; Zhang, Kun; Mao, Ying

    2018-05-02

    Attracting and recruiting health workers to work in rural areas is still a great challenge in China. The rural-oriented tuition-waived medical education (RTME) programme has been initiated and implemented in China since 2010. This study aimed to examine the attitudes of rural-oriented tuition-waived medical students (RTMSs) in Shaanxi towards working in rural areas and the related influencing factors. A cross-sectional survey was conducted in 2015 among 232 RTMSs in two medical universities from the first group of students enrolled in the RTME programme in Shaanxi. Descriptive and analytical statistics were used for the data analyses. Of the 230 valid responses, 92.6% expressed their intentions of breaking the contract for working in rural township hospitals for 6 years after their graduation under the RTME programme. After the contract expired, only 1.3% intended to remain in the rural areas, 66.5% had no intention of remaining, and 32.2% were unsure. The factors related to a positive attitude among the RTMSs towards working in rural areas (no intention of breaking the contract) included being female, having a mother educated at the level of primary school or below, having a good understanding of the policy, having a good cognition of the value of rural medical work, and being satisfied with the policy. The factors related to a positive attitude of the RTMSs towards remaining in rural areas included being female, having a rural origin, having no regular family monthly income, having a father whose occupation was farmer, having a mother educated at the level of postsecondary or above, having the RTMSs be the final arbiter of the policy choice, having a good understanding of the policy, having a good cognition of the value of rural medical work, and being satisfied with the educational scheme. Related policy makers and health workforce managers may benefit from the findings of this study. Appropriate strategies should be implemented to stimulate the RTMSs

  5. 14 CFR 145.223 - FAA inspections.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false FAA inspections. 145.223 Section 145.223... OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.223 FAA inspections. (a) A certificated repair station must allow the FAA to inspect that repair station at any time to determine...

  6. Generator acceptance test and inspection report

    International Nuclear Information System (INIS)

    Johns, B.R.

    1997-01-01

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing

  7. Automated ultrasonic inspection using PULSDAT

    International Nuclear Information System (INIS)

    Naybour, P.J.

    1992-01-01

    PULSDAT (Portable Ultrasonic Data Acquisition Tool) is a system for recording the data from single probe automated ultrasonic inspections. It is one of a range of instruments and software developed by Nuclear Electric to carry out a wide variety of high quality ultrasonic inspections. These vary from simple semi-automated inspections through to multi-probe, highly automated ones. PULSDAT runs under the control of MIPS software, and collects data which is compatible with the GUIDE data display system. PULSDAT is therefore fully compatible with Nuclear Electric's multi-probe inspection systems and utilises all the reliability and quality assurance of the software. It is a rugged, portable system that can be used in areas of difficult access. The paper discusses the benefits of automated inspection and gives an outline of the main features of PULSDAT. Since April 1990 PULSDAT has been used in several applications within Nuclear Electric and this paper presents two examples: the first is a ferritic set-through nozzle and the second is an austenitic fillet weld. (Author)

  8. Intelligent Automated Nuclear Fuel Pellet Inspection System

    International Nuclear Information System (INIS)

    Keyvan, S.

    1999-01-01

    At the present time, nuclear pellet inspection is performed manually using naked eyes for judgment and decisionmaking on accepting or rejecting pellets. This current practice of pellet inspection is tedious and subject to inconsistencies and error. Furthermore, unnecessary re-fabrication of pellets is costly and the presence of low quality pellets in a fuel assembly is unacceptable. To improve the quality control in nuclear fuel fabrication plants, an automated pellet inspection system based on advanced techniques is needed. Such a system addresses the following concerns of the current manual inspection method: (1) the reliability of inspection due to typical human errors, (2) radiation exposure to the workers, and (3) speed of inspection and its economical impact. The goal of this research is to develop an automated nuclear fuel pellet inspection system which is based on pellet video (photographic) images and uses artificial intelligence techniques

  9. SICOM: On-site inspection systems

    International Nuclear Information System (INIS)

    Serna, J.J.; Quecedo, M.; Fernandez, J.R.

    2002-01-01

    As the irradiation conditions become more demanding for the fuel than in the past, there is a need for surveillance programs to gather in-reactor operating experience. The data obtained in these programs can be used to assess the performance of current fuel designs and the improvements incorporated to the fuel assembly design, the performance of the advanced cladding alloys, etc. In these regards, valuable data is obtained from on-site fuel inspections. These on-site data comprise fuel assembly dimensional data such as length and distortion (tilt, twist and bow) and fuel rod data such as length and oxide thickness. These data have to be reliable and accurate to be useful thus, demanding a high precision inspection equipment. However, the inspection equipment has to be also robust and flexible enough to operate in the plant spent fuel pool and, sometimes, without interfering in the works carried out during a plant outage. To meet these requirements, during the past years ENUSA and TECNATOM have developed two on-site inspection systems. While the first system can perform most of the typical measurements in a stand-alone manner thus, without interfering with the critical path of the reload, the second one reduces the inspection time but requires using the plant capabilities. The paper describes both equipment for fuel on-site inspection, their characteristics and main features. (author)

  10. Phased Array Ultrasonic Inspection of Titanium Forgings

    International Nuclear Information System (INIS)

    Howard, P.; Klaassen, R.; Kurkcu, N.; Barshinger, J.; Chalek, C.; Nieters, E.; Sun, Zongqi; Fromont, F. de

    2007-01-01

    Aerospace forging inspections typically use multiple, subsurface-focused sound beams in combination with digital C-scan image acquisition and display. Traditionally, forging inspections have been implemented using multiple single element, fixed focused transducers. Recent advances in phased array technology have made it possible to perform an equivalent inspection using a single phased array transducer. General Electric has developed a system to perform titanium forging inspection based on medical phased array technology and advanced image processing techniques. The components of that system and system performance for titanium inspection will be discussed

  11. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Yule, I.Y.; Sibson, S.; Playle, M.J.

    1996-01-01

    The Advanced Gas-cooled Reactors at Torness and Heysham 2 are provided with dedicated access for remote inspection equipment. These in-service inspection (ISI) accesses comprise 12 penetrations above the core for inspection of the above core area and boilers, 12 below core penetrations for inspection of the lower boiler area and access through any of the 8 gas circulator penetrations for inspection of the sub-diagrid area. This paper describes a manipulator which will access the reactor from above the core via any of the 8 peripheral penetrations. (UK)

  12. Rail inspection system based on iGPS

    Science.gov (United States)

    Fu, Xiaoyan; Wang, Mulan; Wen, Xiuping

    2018-05-01

    Track parameters include gauge, super elevation, cross level and so on, which could be calculated through the three-dimensional coordinates of the track. The rail inspection system based on iGPS (indoor/infrared GPS) was composed of base station, receiver, rail inspection frame, wireless communication unit, display and control unit and data processing unit. With the continuous movement of the inspection frame, the system could accurately inspect the coordinates of rail; realize the intelligent detection and precision measurement. According to principle of angle intersection measurement, the inspection model was structured, and detection process was given.

  13. Fuel assembly inspection device

    International Nuclear Information System (INIS)

    Yaginuma, Yoshitaka

    1998-01-01

    The present invention provides a device suitable to inspect appearance of fuel assemblies by photographing the appearance of fuel assemblies. Namely, the inspection device of the present invention measures bowing of fuel assembly or each of fuel rods or both of them based on the partially photographed images of fuel assembly. In this case, there is disposed a means which flashily projects images in the form of horizontal line from a direction intersecting obliquely relative to a horizontal cross section of the fuel assembly. A first image processing means separates the projected image pictures including projected images and calculates bowing. A second image processing means replaces the projected image pictures of the projected images based on projected images just before and after the photographing. Then, images for the measurement of bowing and images for inspection can be obtained simultaneously. As a result, the time required for the photographing can be shortened, the time for inspection can be shortened and an effect of preventing deterioration of photographing means by radiation rays can be provided. (I.S.)

  14. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  15. Periodic vehicle inspection (MOT). [previously: Periodic Vehicle Inspection of cars (MOT).

    OpenAIRE

    2010-01-01

    In the 1980s the periodic vehicle inspection (MOT) of various categories of vehicles was introduced in the Netherlands. This fact sheet will discuss the legal framework of this measure and the research carried out into its effects on road safety, also in an international context. For instance, the technical conditions of cars at inspection as well as that of cars involved in crashes were studied. Tyre pressure will also be discussed in this fact sheet.

  16. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  17. Turning inspection regulations into training tools

    International Nuclear Information System (INIS)

    Finley, D.; Wheatcraft, D.

    1996-01-01

    In response to suggestions from internal and State of California auditors, the Hazardous Waste Management Division (HWM) at Lawrence Livermore National Laboratory prepared an Inspection Schedule and Guidance Document that summarizes the Laboratory's inspection schedule and procedures for waste treatment, storage, and disposal facilities (TSDFs). Because it explains and comments in detail on the inspection schedule, forms, and procedures, this document is a centralized reference for HWM managers and personnel performing TSDF inspections at the Laboratory. It is also a training tool for experienced and new inspectors, standardizing the inspections of personnel with experience and explaining to novices what to look for and why. This poster presentation traces the team effort that created this document and provides specific examples of how the document was developed and how it is used

  18. Strategic environmental safety inspection for the National disposal program. Description of the inspection volume. Documentation for the scoping team

    International Nuclear Information System (INIS)

    2015-01-01

    The Strategic environmental safety inspection for the National disposal program covers the following topics: Legal framework: determination of the requirement for an environmental inspection program, coordination of the scoping team into the overall context; environmental targets; approach for assessment and evaluation of environmental impact, description of the inspection targets for the strategic environmental inspection; consideration of alternatives.

  19. Licensee Contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from October through December 1991

  20. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-08-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from April through June 1993

  1. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1992-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January through March 1992

  2. Task of radiation hygiene inspection at NPPs

    International Nuclear Information System (INIS)

    Shevts, J.; Kunz, Eh.

    1983-01-01

    The task and functions of the radiation-hygiene inspection in Czechoslovakia are presented. The radiation safety related information amounts that are to be presented to the hygiene inspection institutions are determined. The hygiene inspection content and forms at the stages of NPP designing, construction and operation are discussed. The hygiene inspection place is determined within the general radiation safety system [ru

  3. Report of the Design Approval and the Safety Issues of the Ion Accelerator for Manufacturing

    Energy Technology Data Exchange (ETDEWEB)

    Min, Yi Sub; Lee, Chan Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    The application of ion implantation technology has been extended to the field of semiconductor, as well as of metals, ceramics and polymers. A change in the characteristics of the surface that is required in industries is various. To manufacture these devices which are by requirements of industrial, anyone must be licensed by nuclear law; producing permit. And that device must be certified to safety through the design approval. For the first time in domestic, Korea Multipurpose Accelerator Complex (KOMAC) has finished the producing facility inspection as well as the producing permit in August 2012 that can produce four types of radiation generator(RG)

  4. What to Know About Medicines With New Active Ingredients Approved in FY 2016 / 2016 in Japan and EU: A Brief Comparison of New Medicines Approved in Japan and the EU in 2016.

    Science.gov (United States)

    Kondo, Hideyuki; Saint-Raymond, Agnès; Yasuda, Naoyuki

    2018-03-01

    The Pharmaceuticals and Medical Devices Agency (PMDA) in Japan and the European Medicines Agency (EMA) have a long-standing experience of reviews of new medicines, and they meet their target pre-market review periods. In FY 2016 / 2016, 112 and 83 new medicines were approved in Japan and EU, respectively. Out of these medicines, 41 and 27 medicines containing new active ingredients were approved with total pre-market review periods of 209 days and 428 days in Japan and EU, respectively. Approximately one-third of these medicines were reviewed by the Agencies in close timing, within 1 year between pre-market review applications in Japan and in EU. Taking into account the increasing number of global clinical trials and constant number of consultations or scientific advice related to global clinical trials in Japan, it is clear that the importance of the continuous, collaborative relationship between EMA and PMDA is more and more crucial, as it does facilitate close and timely exchange of information and opinions on products and technologies under development. There already are effective collaborative frameworks between PMDA and EMA in addition to daily communication, and our findings support the development and best use of regulatory tools such as consultation services and scientific advice/protocol assistance for the benefit of the pharmaceutical industry but mostly of patients.

  5. 42 CFR 456.602 - Inspection team.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Inspection team. 456.602 Section 456.602 Public... Institutions for Mental Diseases § 456.602 Inspection team. (a) A team, as described in this section and § 456... team conducting periodic inspections must have a least one member who is at physician or registered...

  6. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1991 through March 1991

  7. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-02-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1990 through December 1990

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January 1993 through March 1993

  9. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-09-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1991 through June 1991

  10. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1993-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1992 through December 1992

  11. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1989-12-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from July 1989 through September 1989

  12. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-07-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1990 through March 1990

  13. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1989 through December 1989

  14. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1992 through September 1992

  15. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-10-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1991 through September 1991

  16. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1990 through June 1990

  17. An optimal inspection strategy for randomly failing equipment

    International Nuclear Information System (INIS)

    Chelbi, Anis; Ait-Kadi, Daoud

    1999-01-01

    This paper addresses the problem of generating optimal inspection strategies for randomly failing equipment where imminent failure is not obvious and can only be detected through inspection. Inspections are carried out following a condition-based procedure. The equipment is replaced if it has failed or if it shows imminent signs of failure. The latter state is indicated by measuring certain predetermined control parameters during inspection. Costs are associated with inspection, idle time and preventive or corrective actions. An optimal inspection strategy is defined as the inspection sequence minimizing the expected total cost per time unit over an infinite span. A mathematical model and a numerical algorithm are developed to generate an optimal inspection sequence. As a practical example, the model is applied to provide a machine tool operator with a time sequence for inspecting the cutting tool. The tool life time distribution and the trend of one control parameter defining its actual condition are supposed to be known

  18. Software inspections at Fermilab -- Use and experience

    International Nuclear Information System (INIS)

    Berman, E.F.

    1998-01-01

    Because of the critical nature of DA/Online software it is important to commission software which is correct, usable, reliable, and maintainable, i.e., has the highest quality possible. In order to help meet these goals Fermi National Accelerator Laboratory (Fermilab) has begun implementing a formal software inspection process. Formal Inspections are used to reduce the number of defects in software at as early a stage as possible. These Inspections, in use at a wide variety of institutions (e.g., NASA, Motorola), implement a well-defined procedure that can be used to improve the quality of many different types of deliverables. The inspection process, initially designed by Michael Fagan, will be described as it was developed and as it is currently implemented at Fermilab where it has been used to improve the quality of a variety of different experiment DA/Online software. Benefits of applying inspections at many points in the software life-cycle and benefits to the people involved will be investigated. Experience with many different types of Inspections and the lessons learned about the inspection process itself will be detailed. Finally, the future of Inspections at Fermilab will be given

  19. Development of an automatic reactor inspection system

    International Nuclear Information System (INIS)

    Kim, Jae Hee; Eom, Heung Seop; Lee, Jae Cheol; Choi, Yoo Raek; Moon, Soon Seung

    2002-02-01

    Using recent technologies on a mobile robot computer science, we developed an automatic inspection system for weld lines of the reactor vessel. The ultrasonic inspection of the reactor pressure vessel is currently performed by commercialized robot manipulators. Since, however, the conventional fixed type robot manipulator is very huge, heavy and expensive, it needs long inspection time and is hard to handle and maintain. In order to resolve these problems, we developed a new automatic inspection system using a small mobile robot crawling on the vertical wall of the reactor vessel. According to our conceptual design, we developed the reactor inspection system including an underwater inspection robot, a laser position control subsystem, an ultrasonic data acquisition/analysis subsystem and a main control subsystem. We successfully carried out underwater experiments on the reactor vessel mockup, and real reactor ready for Ulchine nuclear power plant unit 6 at Dusan Heavy Industry in Korea. After this project, we have a plan to commercialize our inspection system. Using this system, we can expect much reduction of the inspection time, performance enhancement, automatic management of inspection history, etc. In the economic point of view, we can also expect import substitution more than 4 million dollars. The established essential technologies for intelligent control and automation are expected to be synthetically applied to the automation of similar systems in nuclear power plants

  20. Boresonic inspection of power plant rotors

    International Nuclear Information System (INIS)

    Rennie, I.S.

    1990-01-01

    Continental Field Machining and NEI Parsons together are able to provide an on site machining and boresonic inspection service. NEI Parsons existing boresonic equipment is described together with a summary of results obtained during the inspection of eighty rotors. A computer controlled automatic inspection system, planned to be in operation early in 1990, is also described

  1. Inspection device in liquid

    International Nuclear Information System (INIS)

    Nagaoka, Etsuo.

    1996-01-01

    The present invention provides an inspection device in PWR reactor core in which inspection operations are made efficient by stabilizing a posture of the device in front-to-back, vertical and left-to-right directions by a simple structure. When the device conducts inspection while running in liquid, the front and the back directions of the device main body are inspected using a visual device while changing the posture by operating a front-to-back direction propulsion device and a right-to-left direction propulsion device, and a vertical direction propulsion device against to rolling, pitching and yawing of the device main body. In this case, a spherical magnet moves freely in the gravitational direction in a vibration-damping fluid in a non-magnetic spherical shell following the change of the posture of the device main body, in which the vibrations due to the movement of the spherical magnet is settled by the vibration-damping fluid thereby stabilizing the posture of the device main body. At a typical inspection posture, the settling effect is enhanced by the attraction force between the spherical magnets in the spherical shell and each of magnetic force-attracted magnetic members disposed to the outer circumference of the shell, and the posture of the device main body can be confirmed in front-to-back, right-to-left and vertical directions by each of the posture confirming magnetic sensors. (N.H.)

  2. Activities for turbine maintenance: planning, implementation and evaluation of inspection results; Actividades para el mantenimiento de la turbina: planificacion, ejecucion y evaluacion de resultados de las inspecciones

    Energy Technology Data Exchange (ETDEWEB)

    Azcue, J.; Sanchez, M. A.; Alvaro, M.

    2014-04-01

    The article will cover the most significant aspects of how Tecnatom carry out the turbine maintenance work, both from the point of view of the inspection itself as the pre-and post tasks associated. Thus, the issues that will be part of the article are the Manual Inspection Service (MISI) and the inspection database, ISI WEB. These tools are essential for planning field work and serve as a guide to run later turbine inspections in different plants. Following this introduction the inspection teams and the techniques used by Tecnatom will be described. finally, the article will contain a small mention about management studies of life and integrity analysis of the turbine that can be performed, as well as involvement in its safe operation that is derived from them. Ultimately, the intention is to provide a comprehensive approach to the issue in question, the turbine maintenance work, so that the reader can get an ideal of the whole process. (Author)

  3. Automatic welding detection by an intelligent tool pipe inspection

    Science.gov (United States)

    Arizmendi, C. J.; Garcia, W. L.; Quintero, M. A.

    2015-07-01

    This work provide a model based on machine learning techniques in welds recognition, based on signals obtained through in-line inspection tool called “smart pig” in Oil and Gas pipelines. The model uses a signal noise reduction phase by means of pre-processing algorithms and attribute-selection techniques. The noise reduction techniques were selected after a literature review and testing with survey data. Subsequently, the model was trained using recognition and classification algorithms, specifically artificial neural networks and support vector machines. Finally, the trained model was validated with different data sets and the performance was measured with cross validation and ROC analysis. The results show that is possible to identify welding automatically with an efficiency between 90 and 98 percent.

  4. 46 CFR 167.15-10 - Application for annual inspection.

    Science.gov (United States)

    2010-10-01

    ... NAUTICAL SCHOOL SHIPS Inspections § 167.15-10 Application for annual inspection. Application in writing for the annual inspection of every nautical school ship required to be inspected by law and the... Inspection, at any local Marine Inspection Office, U.S. Coast Guard, where the nautical school ship may be...

  5. Utilizing national and international registries to enhance pre-market medical device regulatory evaluation.

    Science.gov (United States)

    Yue, Lilly Q; Campbell, Gregory; Lu, Nelson; Xu, Yunling; Zuckerman, Bram

    2016-01-01

    Regulatory decisions are made based on the assessment of risk and benefit of medical devices at the time of pre-market approval and subsequently, when post-market risk-benefit balance needs reevaluation. Such assessments depend on scientific evidence obtained from pre-market studies, post-approval studies, post-market surveillance studies, patient perspective information, as well as other real world data such as national and international registries. Such registries provide real world evidence and are playing a more and more important role in enhancing the safety and effectiveness evaluation of medical devices. While these registries provide large quantities of data reflecting real world practice and can potentially reduce the cost of clinical trials, challenges arise concerning (1) data quality adequate for regulatory decision-making, (2) bias introduced at every stage and aspect of study, (3) scientific validity of study designs, and (4) reliability and interpretability of study results. This article will discuss related statistical and regulatory challenges and opportunities with examples encountered in medical device regulatory reviews.

  6. Noncontacting Optical Measurement And Inspection Systems

    Science.gov (United States)

    Asher, Jeffrey A.; Jackson, Robert L.

    1986-10-01

    Product inspection continues to play a growing role in the improvement of quality and reduction of scrap. Recent emphasis on precision measurements and in-process inspection have been a driving force for the development of noncontacting sensors. Noncontacting sensors can provide long term, unattended use due to the lack of sensor wear. Further, in applications where, sensor contact can damage or geometrically change the part to be measured or inspected, noncontacting sensors are the only technical approach available. MTI is involved in the development and sale of noncontacting sensors and custom inspection systems. This paper will review the recent advances in noncontacting sensor development. Machine vision and fiber optics sensor systems are finding a wide variety of industrial inspection applications. This paper will provide detailed examples of several state-of-the-art applications for these noncontacting sensors.

  7. 76 FR 56453 - Information Collection Being Submitted for Review and Approval to the Office of Management and...

    Science.gov (United States)

    2011-09-13

    ... required. Privacy Impact Assessment(s): No impact(s). Needs and Uses: 47 CFR 73.1212 requires a broadcast... time of the telecast, shall identify the sponsor. For both sections, for advertising commercial... sponsorship announcements that are waived when the broadcast/origination cablecast of ``want ads'' sponsored...

  8. System for inspection of stacked cargo containers

    Science.gov (United States)

    Derenzo, Stephen [Pinole, CA

    2011-08-16

    The present invention relates to a system for inspection of stacked cargo containers. One embodiment of the invention generally comprises a plurality of stacked cargo containers arranged in rows or tiers, each container having a top, a bottom a first side, a second side, a front end, and a back end; a plurality of spacers arranged in rows or tiers; one or more mobile inspection devices for inspecting the cargo containers, wherein the one or more inspection devices are removeably disposed within the spacers, the inspection means configured to move through the spacers to detect radiation within the containers. The invented system can also be configured to inspect the cargo containers for a variety of other potentially hazardous materials including but not limited to explosive and chemical threats.

  9. Subsea Infrastructure Inspection

    DEFF Research Database (Denmark)

    Mai, Christian; Pedersen, Simon; Hansen, Leif

    2016-01-01

    Due to the increasing energy demands, the offshore energy business has boomed in recent decades. Sub-sea pipeline and power transmission cable installations are commonly applied worldwide. Any potential breakages can cause equipment damage and also damage the environment. The majority...... (S-AUVs) can significantly change the inspections of infrastructure, as these vehicles could be much cheaper to deploy. S-AUVs can potentially conduct faster data collection and provide higher inspection data quality. However, there are still some technical challenges related to: underwater wireless...

  10. Automated visual inspection of moving custom parts

    CSIR Research Space (South Africa)

    Davrajh, S

    2008-01-01

    Full Text Available frequencies than batched produced parts. This higher frequency of inspection significantly impacts inspection times, and inherently, production rates. An effective, diverse, accurate, robust, and time efficient method for inspecting custom parts is therefore...

  11. Overview on pre-harmonization studies conducted by the Working Group on Codes and Standards

    International Nuclear Information System (INIS)

    Guinovart, J.

    1998-01-01

    For more than twenty years, the Working Group on Codes and Standards (WGCS) has been an Advisory Expert Group of the European Commission and three subgroups were formed to consider manufacture and inspection, structural mechanics and materials topics. The WGCS seeks to promote studies at the pre-harmonisation level, for the clarification and building of consensus in the European Community concerning technical issues of relevance for the integrity of safety-related components. It deals with pre-standardization process regarding industrial codes whose rules are applicable to design, construction and operation of NPP components in European Community

  12. User interface inspection methods a user-centered design method

    CERN Document Server

    Wilson, Chauncey

    2014-01-01

    User Interface Inspection Methods succinctly covers five inspection methods: heuristic evaluation, perspective-based user interface inspection, cognitive walkthrough, pluralistic walkthrough, and formal usability inspections. Heuristic evaluation is perhaps the best-known inspection method, requiring a group of evaluators to review a product against a set of general principles. The perspective-based user interface inspection is based on the principle that different perspectives will find different problems in a user interface. In the related persona-based inspection, colleagues assume the

  13. Pressure vessel integrity and weld inspection procedure

    International Nuclear Information System (INIS)

    Solomon, K.A.; Okrent, D.; Kastenberg, W.E.

    1975-01-01

    The primary objective of this paper is to develop a simple methodology which, when coupled with existing observations on pressure vessel behavior, provides an inter-relation between pressure vessel integrity, and the parameters of the in-service inspection program, including inspection sample size, frequency and efficiency. A modified Markov process is employed and a computer code was written to obtain numerical results. The Markov process mathematically describes the following physical events. In a nuclear reactor pressure vessel weld, some defects may exist prior to the zeroth inspection (i.e., prior to vessel operation). During the zeroth inspection and repair processes, some of these defects are removed. During the first cycle of vessel operation, the existing defects may grow and some new defects may be generated. Those defects that are found at the first (and succeeding) inspection interval and warrant repair, are repaired. The above process continues through several operating cycles to the end of vessel life. During any inspection, only a portion of the welds may be inspected, and with less than perfect efficiency

  14. Development of bore tools for pipe inspection

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Nakahira, Masataka; Taguchi, Kou; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    In the International Thermonuclear Reactor (ITER), replacement and maintenance on in-vessel components requires that all cooling pipes connected be cut and removed, that a new component be installed, and that all cooling pipes be rewelded. After welding is completed, welded area must be inspected for soundness. These tasks require a new work concept for securing shielded area and access from narrow ports. Tools had to be developed for nondestructive inspection and leak testing to evaluate pipe welding soundness by accessing areas from inside pipes using autonomous locomotion welding and cutting tools. A system was proposed for nondestructive inspection of branch pipes and the main pipe after passing through pipe curves, the same as for welding and cutting tool development. Nondestructive inspection and leak testing sensors were developed and the basic parameters were obtained. In addition, the inspection systems which can move inside pipes and conduct the nondestructive inspection and the leak testing were developed. In this paper, an introduction will be given to the current situation concerning the development of nondestructive inspection and leak testing machines for the branch pipes. (author)

  15. Heat exchanger tube inspection using ultrasonic arrays

    International Nuclear Information System (INIS)

    Meyer, P.A.; Carodiskey, T.J.

    1986-01-01

    Tubing used in industrial heat exchangers is often subject to failure caused by corrosion and cracking. Technical conferences are used as a forum in the steam generator industry to ensure that the failure mechanisms are well understood and that the quality of the heat exchanger is maintained. The quality of a heat exchanger can be thought of as its ability to operate to design specifications over its intended life. This is the motivation to inspect and evaluate these devices periodically. Inspection, however, normally requires shutdown of the heat exchanger which is costly but is much more acceptable than an unscheduled shutdown due to failure of a tube. Therefore, the degree of inspection is established by balancing the cost of inspection with the risk of a tube failure. Any method of reducing the cost of inspection will permit a higher degree of inspection and, therefore, improve heat exchanger quality. This paper reviews the design and performance of an improved method of ultrasonic inspection of heat exchanger tubing with emphasis on applications in the nuclear industry

  16. In-service inspection guidelines for composite aerospace structures

    International Nuclear Information System (INIS)

    Heida, Jaap H.; Platenkamp, Derk J.

    2012-01-01

    The in-service inspection of composite aerospace structures is reviewed, using the results of a evaluation of promising, mobile non-destructive inspection (NDI) methods. The evaluation made use of carbon fibre reinforced specimens representative for primary composite aerospace structures, including relevant damage types such as impact damage, delaminations and disbonds. A range of NDI methods were evaluated such as visual inspection, vibration analysis, phased array ultrasonic inspection, shearography and thermography inspection. Important aspects of the evaluation were the capability for defect detection and characterization, portability of equipment, field of view, couplant requirements, speed of inspection, level of training required and the cost of equipment. The paper reviews the damage tolerance design approach for composites, and concludes with guidelines for the in-service inspection of composite aerospace structures.

  17. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  18. Inspection technologies -Development of national safeguards technology-

    International Nuclear Information System (INIS)

    Hong, J. S.; Kim, B. K.; Kwack, E. H.

    1996-12-01

    17 facility regulations prepared by nuclear facilities according to the Ministerial Notices were evaluated. Safeguards inspection activities under Safeguards are described. Safeguards inspection equipments and operation manuals to be used for national inspection are also described. Safeguards report are produced and submitted to MOST by using the computerized nuclear material accounting system at state level. National inspection support system are developed to produce the on-site information for domestic inspection. Planning and establishment of policy for nuclear control of nuclear materials, international cooperation for nuclear control, CTBT, strengthening of international safeguards system, and the supply of PWRs to North Korea are also described. (author). 43 tabs., 39 figs

  19. Study on In-Service Inspection Program and Inspection Technologies for Commercialized Sodium-Cooled Fast Reactor

    International Nuclear Information System (INIS)

    Masato Ando; Shigenobu Kubo; Yoshio Kamishima; Toru Iitsuka

    2006-01-01

    The objective of in-service inspection of a nuclear power plant is to confirm integrity of function of components necessary to safety, and satisfy the needs to protect plant investment and to achieve high plant ability. The sodium-cooled fast reactor, which is designed in the feasibility study on commercialized fast reactor cycle systems in Japan, has two characteristics related to in-service inspection. The first is that all sodium coolant boundary structures have double-wall system. Continuous monitoring of the sodium coolant boundary structures are adopted for inspection. The second characteristic is the steam generator with double-wall-tubes. Volumetric testing is adopted to make sure that one of the tubes can maintain the boundary function in case of the other tube failure. A rational in-service inspection concept was developed taking these features into account. The inspection technologies were developed to implement in-service inspection plan. The under-sodium viewing system consisted of multi ultrasonic scanning transducers, which was used for imaging under-sodium structures. The under-sodium viewing system was mounted on the under-sodium vehicle and delivered to core internals. The prototype of under-sodium viewing system and vehicle were fabricated and performance tests were carried out under water. The laboratory experiments of volumetric testing for double-wall-tubes of steam generator, such as ultrasonic testing and remote-field eddy current testing, were performed and technical feasibility was assessed. (authors)

  20. 9 CFR 355.21 - Products entering inspected plants.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Products entering inspected plants. 355.21 Section 355.21 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  1. Optimizing the design of international safeguards inspection systems

    International Nuclear Information System (INIS)

    Markin, J.T.; Coulter, C.A.; Gutmacher, R.G.; Whitty, W.J.

    1983-01-01

    Efficient implementation of international inspections for verifying the operation of a nuclear facility requires that available resources be allocated among inspection activities to maximize detection of misoperation. This report describes a design and evaluation method for selecting an inspection system that is optimal for accomplishing inspection objectives. The discussion includes methods for identifying system objectives, defining performance measures, and choosing between candidate systems. Optimization theory is applied in selecting the most preferred inspection design for a single nuclear facility, and an extension to optimal allocation of inspection resources among States containing multiple facilities is outlined. 3 figures, 5 tables

  2. 75 FR 27225 - Hass Avocados from Mexico; Importation into the Commonwealth of Puerto Rico and Other Changes

    Science.gov (United States)

    2010-05-14

    ... Mexican national plant protection organization to use an approved designee to inspect avocados for export... (NPPO) to use an approved designee to inspect avocados for export; and Limit the scope of suspension of... remove it. Use of an Approved Designee to Inspect Avocados for Export Currently, our regulations in Sec...

  3. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1981-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  4. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1980-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. In the present paper, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  5. 9 CFR 355.3 - Plants eligible for inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Plants eligible for inspection. 355.3 Section 355.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  6. Promoting transparency: The Korean national inspection experience

    International Nuclear Information System (INIS)

    Kim, B.K.

    1999-01-01

    The Republic of Korea started the LAMA full-scope safeguards inspection with the TRIGA research reactor in 1976 when the nuclear industry was at its infancy. Over two decades of rapid economic growth was propelled by stable supply of electricity, substantially from nuclear energy. Today nearly half of the nations electricity comes from sixteen operating nuclear power plants (12 LWRs + 4 OLRs). Total number of facilities under IAEA inspection reaches 30 where the Agency conducts about 400 PDIs annually. Within the last decade, nuclear transparency in Korea has transformed into the international norm primarily from the needs of rapidly expanding domestic nuclear program. In addition, possibility of North/South mutual inspection helped initiate the national inspection regime in addition to the IAEA inspection. The Technology Center for Nuclear Control was established at KAERI in 1994 in order to maintain the nation's nuclear verification expertise in support of the Korean government. National inspections have been carried out simultaneously with the IAEA inspection since 1997 with trial facilities, and all domestic facilities are being inspected from this year. Necessary legal framework and working procedures were developed and field-tried for LWRs, OLRs, fuel fabrication plants and research reactor facilities. Although the inspection equipment and technology along with the safeguards criteria are quite similar to those of the Agency, it is essential to maintain the independent conclusion capabilities between IAEA and the national authority. Substantial improvements in the IAEA safeguards inspection goal attainments since 1997 are credited to the increasing safeguards awareness among operators and SSAC. Further work is necessary to develop the evaluation criteria based on the field inspection results to meet the national inspection goals. The Korean Government signed the Additional Protocol with IAEA on June, 1999 after much deliberation since it involves facilities

  7. 1990 waste tank inspection program

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1990-01-01

    Aqueous radioactive wastes from Savannah River Site separations processes are contained in large underground carbon steel tanks. Tank conditions are evaluated by inspection using periscopes, still photography, and video systems for visual imagery. Inspections made in 1990 are the subject of this report

  8. X-ray inspection of foreign bodies in foods

    International Nuclear Information System (INIS)

    Ohira, Norihiro; Hongjun, Zhou; Sakamaki, Kazumi; Kamimura, Kunio; Shimizu, Hideaki; Saiki, Hideo

    2008-01-01

    X-ray inspection system of foreign bodies in foods has become is necessary for our society in recent years, with the expectation that they could inspect not only metals but also other bodies like glass, rubber, nylon, etc. Calculation algorithms for X-ray inspection of foreign bodies in foods have been reported. In food inspection systems, it is important that inspection is high precision, with high speed that is as fast as conveyor belts. Using Statistical methods, we construct a higher precision method than usual methods. We focused on Kittler's minimum error thresholding. In the usual Kittler's method, order n-squared calculations are required for distributed calculation, so it is not suitable for high speed food inspection. We find that using approximations of variances in Kittler's method is not too critical for practical use. Using it, we be come able to inspect for foreign bodies that were not able to be inspected for so far. (author)

  9. In-field inspection support software: A status report on the Common Inspection On-site Software Package (CIOSP) project

    International Nuclear Information System (INIS)

    Novatchev, Dimitre; Titov, Pavel; Siradjov, Bakhtiiar; Vlad, Ioan; Xiao Jing

    2001-01-01

    Full text: IAEA has invested much thought and effort into developing software that can assist inspectors during their inspection work. Experience with such applications has been steadily growing and IAEA has recently commissioned a next-generation software package. This kind of software accommodates inspection tasks that can vary substantially in function depending on the type of installation being inspected as well as ensures that the resulting software package has a wide range of usability and can preclude excessive development of plant-specific applications. The Common Inspection On-site Software Package is being developed in the Department of Safeguards to address the limitations of the existing software and to expand its coverage of the inspection process. CIOSP is 'common' in that it is aimed at providing support for as many facilities as possible with the minimum re-configuration. At the same time it has to cater to varying needs of individual facilities, different instrumentation and verification methods used. A component-based approach was taken to successfully tackle the challenges that the development of this software presented. CIOSP consists of the following major components: A framework into which individual plug-ins supporting various inspection activities can integrate at run-time; A central data store containing all facility configuration data and all data collected during inspections; A local data store, which resides on the inspector's computer, where the current inspection's data is stored; A set of services used by all plug-ins (i.e. data transformation, authentication, replication services etc.). This architecture allows for incremental development and extension of the software with plug-ins that support individual inspection activities. The core set of components along with the framework, the Inventory Verification, Book Examination and Records and Reports Comparison plug-ins have been developed. The development of the Short Notice Random

  10. Hydro-Quebec inspection robot RIT-LRG

    International Nuclear Information System (INIS)

    Champagne, D.; Rinfret, F.; Bourgault, Y.G.

    2008-01-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  11. Hydro-Quebec inspection robot RIT-LRG

    Energy Technology Data Exchange (ETDEWEB)

    Champagne, D., E-mail: champagne.dominique@ireq.ca [Inst. de recherche d' Hydro-Quebec, Quebec (Canada); Rinfret, F.; Bourgault, Y.G., E-mail: rinfret.francois@hydro.qc.ca, E-mail: bourgault.yves.g@hydro.qc.ca [Hydro-Quebec, Becancour, Quebec (Canada)

    2008-07-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  12. 7 CFR 205.403 - On-site inspections.

    Science.gov (United States)

    2010-01-01

    ..., Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Certification § 205.403 On-site inspections. (a) On-site inspections. (1... site that produces or handles organic products and that is included in an operation for which...

  13. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  14. Experimental Stress Analysis at Railway Inspection Pit

    Directory of Open Access Journals (Sweden)

    Nicuşor Laurentiu Zaharia

    2008-10-01

    Full Text Available Railway inspection pits are used in railway halls. The purpose of inspection pits is to allow the working under the vehicle. Inspection pits can be found in locomotive depots, factories etc. The new design for a inspection pit in a railway hall involve tests in purpose of homologations the railway infrastructure. Before the homologation committee meeting, tests are made; after the test, a testing report is made which it will be part at homologation documents.

  15. Extension of the pre-retirement programmes

    CERN Document Server

    2012-01-01

    Following recommendation by the Standing Concertation Committee at its meeting on 2 December 2011 and approval by the Director-General, please note that: the Progressive Retirement Programme has been extended by one year, from 1 April 2012 until 31 March 2013; and the Part-Time Work as a Pre-retirement Measure has also been extended by one year, from 1 January 2012 until 31 December 2012. Further information is available from the following sites: https://cern.ch/admin-eguide/retraite/proc_prp.asp https://cern.ch/admin-eguide/retraite/proc_pTp.asp Tel.  73903 Human Resources Department

  16. Extension of the pre-retirement programmes

    CERN Multimedia

    2014-01-01

    Following a recommendation by the Standing Concertation Committee at its meeting on 27 November 2014 and approval by the Director-General, please note that: the Progressive Retirement Programme has been extended by one year, from 1 April 2015 until 31 March 2016; the Scheme of Part-Time Work as a Pre-retirement Measure has also been extended by one year, from 1 January 2015 until 31 December 2015. Further information is available at the following sites: https://admin-eguide.web.cern.ch/node/447 https://admin-eguide.web.cern.ch/node/484 Human Resources Department Tel. 79257 / 73903

  17. Do OSHA Inspections Reduce Injuries? A Panel Analysis

    OpenAIRE

    Wayne B. Gray; John T. Scholz

    1991-01-01

    Using data on injuries and OSHA inspections for 6,842 large manufacturing plants between 1979 and 1985, we find evidence that OSHA inspections significantly reduce injuries. This effect comes exclusively from inspections that impose penalties, inspections which do not impose penalties appear to have no effect on injuries. Plants which are inspected (and penalized) in a given year experience a 22 percent decline in their injuries during the following few years. In our sample, total OSHA enforc...

  18. Hospital Inspections

    Data.gov (United States)

    U.S. Department of Health & Human Services — Welcome to hospitalinspections.org, a website run by the Association of Health Care Journalists (AHCJ) that aims to make federal hospital inspection reports easier...

  19. Mechanized inspection of steam generator components during manufacture

    International Nuclear Information System (INIS)

    Otte, H.-J.; Leupoldt, K.; Meister, W.

    2009-01-01

    Steam Generator (SG) parts are intensively inspected by UT in the course of the manufacturing process. These inspections - mostly performed manually using different codes - are time consuming and call for a sophisticated documentation, figuring part of the life time documentation package. In order to reduce time and costs mechanized inspection equipment is introduced, combining short inspection times, avoiding influence of the human factor and providing proper electronic storage of all inspection results prepared for comparison with data generated during in-service inspection. Since 2001 Cegelec delivered various UT systems for gas turbine disks and rotor ends called SIRO-MAN. Within only a few years the majority of important providers of such components successfully switched from manual inspection to mechanized inspection following the requirements of manufacturers like ALSTOM, GE and Siemens. The SIRO-MAN is now adapted to the needs of mechanized inspection of SG components. The inspection is performed on the products during rotation around the vertical axis. The multi - probe assemblies are manoeuvred on the products by a manipulator system backed by a NC control unit. Acoustic coupling of UT probes to the product surface is performed with oil or water in a closed circuit. UT and - if requested ET - data along with position information of the probe assembly provided by the control unit are acquired, processed and evaluated by an UT / ET electronic system delivered by either Olympus or ZETEC. As performed already on rotor ends a sequence of inspections using different parameter settings can be programmed with simple means (Teach In) so that such inspection sequence can be executed without operating personnel. Probe assemblies allow for individual operation of probes out of the probe assembly according to the individual needs. Conventional UT and phased array applications or combination of both techniques can be provided. The UT / ET electronic equipment offers

  20. 38 CFR 17.65 - Approvals and provisional approvals of community residential care facilities.

    Science.gov (United States)

    2010-07-01

    ... approvals of community residential care facilities. 17.65 Section 17.65 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Community Residential Care § 17.65 Approvals and provisional approvals of community residential care facilities. (a) An approval of a facility meeting all of...

  1. Visual inspection. Better than your eyes

    International Nuclear Information System (INIS)

    Jakobs, N.; Baumgartl, R.

    2005-01-01

    Ongoing improvements in the development of camera technologies and manipulator techniques permit an enhanced performance of inspection tasks in nuclear services. In areas of reduced dose rate it's possible to use small size high resolution CCD cameras instead of tube cameras. Underwater inspections may be performed by submarine instead of rigid manipulator systems. This allows the enlargement of inspection areas and the performance at reduced time and personnel dose rate. (author)

  2. Modelling inspection policies for building maintenance.

    Science.gov (United States)

    Christer, A H

    1982-08-01

    A method of assessing the potential of an inspection maintenance policy as opposed to an existing breakdown maintenance policy for a building complex is developed. The method is based upon information likely to be available and specific subjective assessments which could be made available. Estimates of the expected number of defects identified at an inspection and the consequential cost saving are presented as functions of the inspection frequency.

  3. 7 CFR 29.57 - Where inspection is offered.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Where inspection is offered. 29.57 Section 29.57... REGULATIONS TOBACCO INSPECTION Regulations Permissive Inspection § 29.57 Where inspection is offered. Tobacco..., samplers, or weighers are available and the tobacco is offered under conditions that permit of its proper...

  4. SU-F-BRE-13: Replacing Pre-Treatment Phantom QA with 3D In-Vivo Portal Dosimetry for IMRT Breast Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Stroom, J; Vieira, S; Greco, C [Champalimaud Foundation, Lisbon (Portugal); Olaciregui-Ruiz, I; Rozendaal, R; Herk, M van [The Netherlands Cancer Institute, Amsterdam, North Holland (Netherlands); Moser, E [Champalimaud Foundation, Lisbon, Lisbon (Portugal)

    2014-06-15

    Purpose: Pre-treatment QA of individual treatment plans requires costly linac time and physics effort. Starting with IMRT breast treatments, we aim to replace pre-treatment QA with in-vivo portal dosimetry. Methods: Our IMRT breast cancer plans are routinely measured using the ArcCheck device (SunNuclear). 2D-Gamma analysis is performed with 3%/3mm criteria and the percentage of points with gamma<1 (nG1) is calculated within the 50% isodose surface. Following AAPM recommendations, plans with nG1<90% are approved; others need further inspection and might be rejected. For this study, we used invivo portal dosimetry (IPD) to measure the 3D back-projected dose of the first three fractions for IMRT breast plans. Patient setup was online corrected before for all measured fractions. To reduce patient related uncertainties, the three IPD results were averaged and 3D-gamma analysis was applied with abovementioned criteria . For a subset of patients, phantom portal dosimetry (PPD) was also performed on a slab phantom. Results: Forty consecutive breast patients with plans that fitted the EPID were analysed. The average difference between planned and IPD dose in the reference point was −0.7+/−1.6% (1SD). Variation in nG1 between the 3 invivo fractions was about 6% (1SD). The average nG1 for IPD was 89+/−6%, worse than ArcCheck (95+/−3%). This can be explained by patient related factors such as changes in anatomy and/or model deficiencies due to e.g. inhomogeneities. For the 20 cases with PPD, mean nG1 was equal to ArcCheck values, which indicates that the two systems are equally accurate. These data therefore suggest that proper criteria for 3D invivo verification of breast treatments should be nG1>80% instead of nG1>90%, which, for our breast cases, would result in 5% (2/40) further inspections. Conclusion: First-fraction in-vivo portal dosimetry using new gamma-evaluation criteria will replace phantom measurements in our institution, saving resources and yielding 3D

  5. Inservice inspection of Halden BWR pressure vessel

    International Nuclear Information System (INIS)

    Foerli, O.; Hernes, T.

    1978-01-01

    A description is given of how the recertification inspection of the 20 years old Halden Reactor pressure vessel was carried out in accordance with the latest ASME-CODES, despite the fact that inspection accessibility was poor. As no volumetric inspection had been carried out since the preservice radiography in 1957, the ultrasonic inspection included the high flux region of all welds. In total 70% of longitudinal welds and 20% of bottom circumferential welds were inspected as well as the bottom nozzle connection. The vessel was not designed with provisions for inservice inspection, the welds are unaccessible from the outside and removal of the lid is virtually impossible. The ultrasonic probes could only be loaded through 77 mm diameter holes in the top lid and remotely positioned inside the vessel. The inspection was performed using 450C and 60OC 1 MHz angle probes and 2.25 MHz normal probes in immersion technique. In a zone around the welds, small regions with lack of bonding between the stainless steel cladding and the boiler steel were revealed. One root defect known and accepted from the preservice radiographs was examined. The defect was found to be 6x30mm as a maximum and well within acceptable limits according to the fracture mechanics analysis method recommended in ASME X1. The inspection required a period of three weeks' work in the reactor hall. (UK)

  6. Massively parallel E-beam inspection: enabling next-generation patterned defect inspection for wafer and mask manufacturing

    Science.gov (United States)

    Malloy, Matt; Thiel, Brad; Bunday, Benjamin D.; Wurm, Stefan; Mukhtar, Maseeh; Quoi, Kathy; Kemen, Thomas; Zeidler, Dirk; Eberle, Anna Lena; Garbowski, Tomasz; Dellemann, Gregor; Peters, Jan Hendrik

    2015-03-01

    SEMATECH aims to identify and enable disruptive technologies to meet the ever-increasing demands of semiconductor high volume manufacturing (HVM). As such, a program was initiated in 2012 focused on high-speed e-beam defect inspection as a complement, and eventual successor, to bright field optical patterned defect inspection [1]. The primary goal is to enable a new technology to overcome the key gaps that are limiting modern day inspection in the fab; primarily, throughput and sensitivity to detect ultra-small critical defects. The program specifically targets revolutionary solutions based on massively parallel e-beam technologies, as opposed to incremental improvements to existing e-beam and optical inspection platforms. Wafer inspection is the primary target, but attention is also being paid to next generation mask inspection. During the first phase of the multi-year program multiple technologies were reviewed, a down-selection was made to the top candidates, and evaluations began on proof of concept systems. A champion technology has been selected and as of late 2014 the program has begun to move into the core technology maturation phase in order to enable eventual commercialization of an HVM system. Performance data from early proof of concept systems will be shown along with roadmaps to achieving HVM performance. SEMATECH's vision for moving from early-stage development to commercialization will be shown, including plans for development with industry leading technology providers.

  7. Quality assurance inspections for shipping and storage containers

    Energy Technology Data Exchange (ETDEWEB)

    Stromberg, H.M.; Roberts, G.D.; Bryce, J.H. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

    1996-04-01

    This is a guide for conducting quality assurance inspections of transportation packaging and dry spent fuel storage system suppliers. (Suppliers are defined as designers, fabricators, distributors, users or owners of those packaging and storage systems.) This guide may be used during inspection to determine regulatory compliance with 10 CFR, Part 71, Subpart H; 10 CFR, Part 72, Subpart G; 10 CFR, Part 21; and supplier`s quality assurance program commitments. It was developed to provide a structured, consistent approach to inspections. The guidance therein provides a framework for evaluation of transportation packaging and dry spent fuel storage systems quality assurance programs. Inspectors are provided with the flexibility to adapt the methods and concepts to meet inspection requirements for the particular facility. The method used in the guide treats each activity at a facility as a separate performance element and combines the activities within the framework of an ``inspection tree.``The method separates each performance element into several areas for inspection and identifies guidelines, based on regulatory requirements, to qualitatively evaluate each area. This guide also serves as a field manual to facilitate quality assurance inspection activities. This guide replaces an earlier one, NUREG/CR-5717 (Packing Supplier Inspection Guide). This replacement guide enhances the inspection activities for transportation packagings and adds the dry spent fuel storage system quality assurance inspection activities.

  8. Quality assurance inspections for shipping and storage containers

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Roberts, G.D.; Bryce, J.H.

    1996-04-01

    This is a guide for conducting quality assurance inspections of transportation packaging and dry spent fuel storage system suppliers. (Suppliers are defined as designers, fabricators, distributors, users or owners of those packaging and storage systems.) This guide may be used during inspection to determine regulatory compliance with 10 CFR, Part 71, Subpart H; 10 CFR, Part 72, Subpart G; 10 CFR, Part 21; and supplier's quality assurance program commitments. It was developed to provide a structured, consistent approach to inspections. The guidance therein provides a framework for evaluation of transportation packaging and dry spent fuel storage systems quality assurance programs. Inspectors are provided with the flexibility to adapt the methods and concepts to meet inspection requirements for the particular facility. The method used in the guide treats each activity at a facility as a separate performance element and combines the activities within the framework of an ''inspection tree.''The method separates each performance element into several areas for inspection and identifies guidelines, based on regulatory requirements, to qualitatively evaluate each area. This guide also serves as a field manual to facilitate quality assurance inspection activities. This guide replaces an earlier one, NUREG/CR-5717 (Packing Supplier Inspection Guide). This replacement guide enhances the inspection activities for transportation packagings and adds the dry spent fuel storage system quality assurance inspection activities

  9. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  10. NRC program of inspection and enforcement

    International Nuclear Information System (INIS)

    LeDoux, J.C.; Rehfuss, C.

    1978-01-01

    The Nuclear Regulatory Commission (NRC) regulates civilian uses of nuclear materials to ensure the protection of the public health and safety and the environment. The Office of Inspection and Enforcement (IE) develops and implements the inspection, investigation, and enforcement programs for the NRC. The IE conducts inspection programs for reactors under construction and in operation, nuclear industry vendors, fuel facilities and users of nuclear materials, and all aspects of the safeguarding of facilities and materials. Recently the IE began implementing a program that will place inspectors on site at nuclear power reactors and will provide for national appraisal of licensee performance and for an evaluation of the effectiveness of the inspection programs

  11. Remote inspection system for nuclear power plants

    International Nuclear Information System (INIS)

    Inagaki, K.; Fujii, M.; Doi, A.; Harima, T.

    1977-01-01

    A remote inspection system for nuclear power plants was constructed based on an analysis of inspections performed by an operator on patrol. This system consists of an operator's console and a remote station. The remote station, equipped with five kinds of sensors, is steered along the inspection route by a photoelectric guiding system or may be manually controlled from an operator's console in a main control room. Signals for control and inspection data are multiplexed and transmitted through a coaxial cable

  12. RSE-M: In-Service Inspection Rules for Mechanical Components of PWR Nuclear Islands

    International Nuclear Information System (INIS)

    2016-01-01

    The RSE-M code defines in-service inspection operations. It applies to pressure equipment used in PWR plants, as well as spare parts for such equipment. The RSE-M code does not apply to equipment made from materials other than metal. It is based on the RCC-M code for requirements relating to the design and fabrication of mechanical components. Use: The inspection rules specified in the RSE-M code describe the standard requirements of best practice within the French nuclear industry, based on its own feedback from operating several nuclear units and partly supplemented with requirements stipulated by French regulations. To date, the 58 units in France's nuclear infrastructure enforce the in-service inspection rules of the RSE-M code. Operation of 30 commissioned units in China's nuclear infrastructure, corresponding to the M310, CPR-1000 and CPR-600 reactors, is based on the RSE-M code (since 2007, use of AFCEN codes has been required by NNSA for Generation II+ reactors). Contents of the 2016 Edition: Volume I - Rules: Section A - General rules, Section B - Specific rules for class 1 components, Section C - Specific rules for class 2 or 3 components, Section D - Specific rules for components not assigned to any particular RSE-M class; Volume II - Appendices 1 to 8: Appendices 1.0 to 1.9: supporting appendices for the general requirements, Appendix 2.1: appendix associated with chap. 2000 Requalifications, Hydraulic Proof Tests and Hydraulic Tests, Appendices 4.1 to 4.4: appendices associated with chap. 4000 Examination techniques, Appendices 5.1 to 5.8 and RPP2: appendices associated with chap. 5000 Mechanical and Materials, Appendices 8.1 to 8.2: appendices associated with chap. 8000 Maintenance Operations; Volume III: Appendix 3.1 - Visit tables: main primary and secondary systems, EPR pre-service inspection program, Class 2 or 3 vessels; Appendix 3.2 - Inspection Plans For Non-Nuclear Pressure Equipment

  13. Optimal allocation of international atomic energy agency inspection resources

    International Nuclear Information System (INIS)

    Markin, J.T.

    1987-01-01

    Each year the Department of Safeguards of the International Atomic Energy Agency (IAEA) conducts inspections to confirm that nuclear materials and facilities are employed for peaceful purposes. Because of limited inspection resources, however, the IAEA cannot fully attain its safeguards goals either quantitatively as measured by the inspection effort negotiated in the facility attachments or qualitatively as measured by the IAEA criteria for evaluating attainment of safeguards goals. Under current IAEA procedures the allocation of inspection resources assigns essentially equal inspection effort to facilities of the same type. An alternative approach would incorporate consideration of all material categories and facilities to be assigned inspection resources when allocating effort to a particular facility. One such method for allocating inspection resources is based on the IAEA criteria. The criteria provide a framework for allocating inspection effort that includes a ranking of material types according to their safeguards importance, an implicit definition of inspection activities for each material and facility type, and criteria for judging the attainment of safeguards goals in terms of the quality and frequency of these inspection activities. This framework is applicable to resource allocation for an arbitrary group of facilities such as a state's fuel cycle, the facilities inspected by an operations division, or all of the facilities inspected by the IAEA

  14. Machine vision systems using machine learning for industrial product inspection

    Science.gov (United States)

    Lu, Yi; Chen, Tie Q.; Chen, Jie; Zhang, Jian; Tisler, Anthony

    2002-02-01

    Machine vision inspection requires efficient processing time and accurate results. In this paper, we present a machine vision inspection architecture, SMV (Smart Machine Vision). SMV decomposes a machine vision inspection problem into two stages, Learning Inspection Features (LIF), and On-Line Inspection (OLI). The LIF is designed to learn visual inspection features from design data and/or from inspection products. During the OLI stage, the inspection system uses the knowledge learnt by the LIF component to inspect the visual features of products. In this paper we will present two machine vision inspection systems developed under the SMV architecture for two different types of products, Printed Circuit Board (PCB) and Vacuum Florescent Displaying (VFD) boards. In the VFD board inspection system, the LIF component learns inspection features from a VFD board and its displaying patterns. In the PCB board inspection system, the LIF learns the inspection features from the CAD file of a PCB board. In both systems, the LIF component also incorporates interactive learning to make the inspection system more powerful and efficient. The VFD system has been deployed successfully in three different manufacturing companies and the PCB inspection system is the process of being deployed in a manufacturing plant.

  15. MTR fuel inspection at CERCA

    International Nuclear Information System (INIS)

    Fanjas, Y.

    1992-01-01

    The stringent specifications for MTR fuel plates and fuel elements require various sophisticated inspection techniques. In particular, the development of low enriched silicide fuels made it necessary to adapt these techniques to high density plates. This paper presents the status of inspection technology at CERCA. (author)

  16. 7 CFR 946.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 946.60 Section 946.60... WASHINGTON Order Regulating Handling Inspection and Certification § 946.60 Inspection and certification. (a... this subpart, each handler who first ships potatoes shall, prior to making shipment, cause each...

  17. Optical inspection techniques for security instrumentation

    Science.gov (United States)

    van Renesse, Rudolf L.

    1996-03-01

    This paper reviews four optical inspection systems, in which development TNO Institute of Applied Physics was involved: (1) intaglio scanning and recognition, (2) banknote quality inspection, (3) visualization and reading of a finger pattern, and (4) 3DAS authentication. (1) Intaglio is reserved for high security printing. It renders a tactile relief that can be recognized by a laser scanning technique. This technique is applied by various national banks to detect counterfeit banknotes returning from circulation. A new system is proposed that will detect intaglio on arbitrary wrinkled banknotes. (2) A banknote fitness inspection system (BFIS) that inspects banknotes in specularly reflected light is described. As modern banknotes are provided increasingly with reflective security foils, a new system is proposed that inspects banknotes in specular and diffuse reflection, as well as in transmission. (3) An alternative visualization method for visualization of finger patterns is described, employing a reflective elastomer. A CD scanning system reads the finger patterns. (4) A nonwoven structure has two advantageous properties for card authentication: a random structure which renders each few square millimeters of the pattern uniqueness (identification) and a 3D structure which makes it virtually impossible to be counterfeited (authentication). Both properties are inspected by an extremely simple lenseless reader.

  18. Strategies to reduce PWR inspection time

    International Nuclear Information System (INIS)

    Guerra, J.; Gonzalez, E.

    2001-01-01

    During last few years, a constant reduction in inspection time was clearly demanded by most nuclear plant owners. This requirement has to be accomplished without any impact in inspection quality that, in general, has also to be improved. All this in a market with increasing competition that forces price reductions. Under these new demands from our customers, Tecnatom reoriented its development efforts to improve his products and services to meet this challenges. Two of our main inspection activities that have clear impact in outage duration are Steam Generator and Vessel inspections. This paper describes the improvements made in these two activities as an example of the reorientation of our development efforts with a focus on the technical improvements made on the software and robotic tools applied as in the data acquisition and analysis systems. In the Steam Generator inspections, new robots with dual guide tubes are commonly used. New eddy current instruments and software were developed to keep up with the data rates produced by the faster acquisition system. Use of automatic analysis software is also helping to improve speed while reducing cost and improving overall job quality. Production rates are close to double from the previous inspection system. (author)

  19. Conceptual design for transmission line inspection robot

    International Nuclear Information System (INIS)

    Jalal, M F Abdul; Sahari, K S Mohamed; Anuar, A; Arshad, A D Mohd; Idris, M S

    2013-01-01

    Power transmission line is used for power distribution purposes due to their cost effective measure compared to underlying cable. However, prolonged exposure to natural weather may cause fatigue stress to the lines as well as induce material failure. Therefore, periodical line inspection is considered uttermost important as a preventive measure to avoid power outage. However, transmission line inspection has always been a high risk and expensive work. Hazardous works that may harm operator as well as routine that requires precise handling can be performed by robots. Various types of robots have been designed and developed for line inspection but only perform well on a straight and continuous line. As these robots encounter an obstacle during the inspection, then the real problem in terms of robot stability and smooth operation arises. In this paper, conceptual design and evaluation for transmission line inspection robot is presented. The inspection robot mobile robot must be able to bypass or avoid obstacles as it travels along the power transmission line.

  20. Incore inspection and repairing device

    International Nuclear Information System (INIS)

    Ito, Arata; Kimura, Motohiko

    1998-01-01

    The present invention provides a device for inspecting and repairing the inside of a reactor container even if it is narrow, with no trouble by using a swimming-type operation robot. Namely, the device of the present invention conducts inspection and repairing operations for the inside of the reactor by introducing a swimming type operation robot into the reactor container. The swimming-type operation robot comprises a robot main body having a propeller, a balancer operably disposed to the robot main body and an inspection and repairing unit attached detachable to the balancer. In the device of the present invention, since the inspection and preparing unit is attached detachably to the swimming robot, a robot which transports tools is formed as a standard product. As a result, the production cost can be reduced, and the reliability of products can be improved. Appropriate operations can be conducted by using best tools. (I.S.)