  1. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  2. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  3. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  4. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  5. Wind turbine power stations

    International Nuclear Information System (INIS)

    Anon.

    1992-11-01

    The Countryside Council for Wales (CCW's) policy on wind turbine power stations needs to be read in the context of CCW's document Energy:Policy and perspectives for the Welsh countryside. This identifies four levels of action aimed at reducing emission of gases which contribute towards the risk of global warming and gases which cause acid deposition. These are: the need for investment in energy efficiency; the need for investment in conventional power generation in order to meet the highest environmental standards; the need for investment in renewable energy; and the need to use land use transportation policies and decisions to ensure energy efficiency and energy conservation. CCW views wind turbine power stations, along with other renewable energy systems, within this framework. CCW's policy is to welcome the exploitation of renewable energy sources as an element in a complete and environmentally sensitive energy policy, subject to the Environmental Assessment of individual schemes and monitoring of the long-term impact of the various technologies involved. (Author)

  6. Controversial power station

    International Nuclear Information System (INIS)

    Marcan, P.

    2008-01-01

    When information on plans to build a power station in Trebisov first appeared reactions differed. A 40-billion investment in a town with more than 20% unemployment seemed attractive. But some people did not like the idea of having a power plant located in the town. Around one year after the investment was officially announced TREND returned to Trebisov. In the meantime the investor has managed to overcome one of the biggest obstacles on its way to building a new power plant. The ministry responsible gave the environmental study a positive rating. But objectors are still not sure that everything is fine. They claim that the study misinterprets data and that the ministry did not show expertise when evaluating it. 'Is it possible that a coal power plant located in a town would have twice as many positive effects on peoples' health than negative ones? Why don't we build them everywhere?'asked the chairman of the civic society, Trebisov nahlas, Gejza Gore. The developer of the project, Ceskoslovenska energeticka spolocnost (CES), Kosice is fighting back and claims that their counterpart lacks professional arguments. In the meantime it is preparing for area management proceedings. Trebisov is also involved in the discussion and claims that the town planning scheme does not include such a project. The Ministry of Construction has a different opinion. In the opinion of the Ministry the town planning scheme allows a 885-megawatt power plant to be built only a few hundred meters away from housing estates. (author)

  7. Bradwell Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-01-01

    When built, the Magnox reactors were expected to have operating lifetimes of 20-25 years. In order to satisfy the licensing authorities of their continued safety, long term safety reviews (LTSRs) are being carried out as the reactors reach 20 years of operation. This is the Nuclear Installations Inspectorate's (NII) summary report on Bradwell nuclear power station. The objectives of the LTSR are stated. A description of the plant is followed by an explanation of the statutory position on licensing. The responsibilities of the Central Electricity Generating Board (CEGB) and the NII are defined. From the examination of the CEGB's LTSR it is concluded that this generally confirms the validity of the existing safety case for present operation. However, some recommendations are made as to work required for reactor operation up to 1992. A summary of the NII findings is presented. This includes the reactor pressure circuit integrity, effects of ageing and in-service wear and radiation doses. (U.K.)

  8. Discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report contains details of the technologies used at many nuclear power stations to treat and control radioactive discharges and gives, where information was available, details of discharges and authorised discharge limits. (author)

  9. Torness: proposed nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The need for and desirability of nuclear power, and in particular the proposed nuclear power station at Torness in Scotland, are questioned. Questions are asked, and answered, on the following topics: position, appearance and cost of the proposed Torness plant, and whether necessary; present availability of electricity, and forecast of future needs, in Scotland; energy conservation and alternative energy sources; radiation hazards from nuclear power stations (outside, inside, and in case of an accident); transport of spent fuel from Torness to Windscale; radioactive waste management; possibility of terrorists making a bomb with radioactive fuel from a nuclear power station; cost of electricity from nuclear power; how to stop Torness. (U.K.)

  10. Islands for nuclear power stations

    International Nuclear Information System (INIS)

    Usher, E.F.F.W.; Fraser, A.P.

    1981-01-01

    The safety principles, design criteria and types of artificial island for an offshore nuclear power station are discussed with particular reference to siting adjacent to an industrial island. The paper concludes that the engineering problems are soluble and that offshore nuclear power stations will eventually be built but that much fundamental work is still required. (author)

  11. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  12. The Trencin water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Trencin water power station. The Trencin water power station was built seven years after the Dubnica nad Vahom water power station started its operation and was the last stage of the first and the oldest derived cascade of water power stations on the Vah River. After completing water power stations at Ladce (1936), Ilava (1946) and Dubnica nad Vahom (1949) and before constructing the Trencin water power station, the whole second derived cascade of water power stations including water power stations at Kostolna, Nove Mesto nad Vahom and Horna Streda was built as soon as possible mainly because the need to get compensation for discontinued electricity supplies as well as energetic coal from the Czech Republic. Hereby, experiences from the construction of previous grades were used, mainly as far as the dimensioning was concerned, as the fi rst installed power stations had, in comparison with the growing requirements on the electricity supplies, very low absorption capacity - only 150 m 3 .s -1 . Thus the Trencin power station (original name was the Skalka power station) was already dimensioned for the same absorption capacity as the cascade located downstream the river, that is 180 m 3 .s -1 . That was related also to growing demands on electricity supplies during the peaks in the daily electric system load diagram, and thus to the transfer from continuous operation of the water power station to semi-peak or even peak performance. According to the standards of power station classification, the Trencin water power station is a medium size, low pressure, channel power station with two units equipped by Kaplan turbines and synchronous hydro-alternators. The water power station installed capacity is 16.1 MW in total and its designed annual production of electrical energy for medium water year is 85,000 MWh, while the average annual production during the last 30 years is 86,252 MWh. Installed unit has a four-blade Kaplan turbine with the diameter

  13. Services for nuclear power stations

    International Nuclear Information System (INIS)

    Fremann, M.; Ryckelynck

    1987-01-01

    This article gives an information as complete as possible about the activities of the french nuclear industry on the export-market. It describes the equipment and services available in the field of services for nuclear power stations [fr

  14. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  15. Balakovo nuclear power station

    International Nuclear Information System (INIS)

    1996-01-01

    A key means of improving the safety and reliability of nuclear power plants is through effective training of plant personnel. The goal of this paper is to show the progress of the training at the Balakovo Nuclear Power Plant, and the important role that international cooperation programs have played in that progress

  16. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  17. The Paks Nuclear Power Station

    International Nuclear Information System (INIS)

    Erdosi, N.; Szabo, L.

    1978-01-01

    As the first stage in the construction of the Paks Nuclear Power Station, two units of 440 MW(e) each will be built. They are operated with two coolant loops each. The reactor units are VVER 440 type water-moderated PWR type heterogeneous power reactors designed in the Soviet Union and manufactured in Czechoslovakia. Each unit operates two Soviet-made K-220-44 steam turbines and Hungarian-made generators of an effective output of 220 MW. The output of the transformer units - also of Hungarian made - is 270 MVA. The radiation protection system of the nuclear power station is described. Protection against system failures is accomplished by specially designed equipment and security measures especially within the primary circuit. Some data on the power station under construction are given. (R.P.)

  18. Power station simulators

    International Nuclear Information System (INIS)

    Zanobetti

    1989-01-01

    The number and the variety of simulators have gown to such an extent that it has become necessary to classify the numerous types now available. Simulators are of paramount importance for the design of nuclear power plants, for optimizing their efficiency and for the training of their operators: factors that contribute to their overall security. This book contains chapters on the following subjects: the development of power plant simulators, the components and classification of simulators, simulator technology, simulator performance and problems in simulator training

  19. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  20. Monitoring of nuclear power stations

    International Nuclear Information System (INIS)

    Ull, E.; Labudda, H.J.

    1987-01-01

    The purpose of the invention is to create a process for undelayed automated detection and monitoring of accidents in the operation of nuclear power stations. According to the invention, this problem is solved by the relevant local measurements, such as radiation dose, components and type of radiation and additional relevant meteorological parameters being collected by means of wellknown data collection platforms, these being transmitted via transmission channels by means of satellites to suitable worldwide situated receiving stations on the ground, being processed there and being evaluated to recognise accidents. The local data collection platforms are used in the immediate vicinity of the nuclear power station. The use of aircraft, ships and balloons as data collection systems is also intended. (HWJ)

  1. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  2. Pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Ogura, Shiro

    1979-01-01

    16 nuclear power plants are in commercial operation in Japan, and nuclear power generation holds the most important position among various substitute energies. Hereafter also, it is expected that the construction of nuclear power stations will continue because other advantageous energy sources are not found. In this paper, the outline of the pumps used for BWR plants is described. Nuclear power stations tend to be large scale to reduce the construction cost per unit power output, therefore the pumps used are those of large capacity. The conditions to be taken in consideration are high temperature, high pressure, radioactive fluids, high reliability, hydrodynamic performances, aseismatic design, relevant laws and regulations, and quality assurance. Pumps are used for reactor recirculation system, control rod driving hydraulic system, boric acid solution injecting system, reactor coolant purifying system, fuel pool cooling and purifying system, residual heat removing system, low pressure and high pressure core spraying systems, and reactor isolation cooling system, for condensate, feed water, drain and circulating water systems of turbines, for fresh water, sea water, make-up water and fire fighting services, and for radioactive waste treating system. The problems of the pumps used for nuclear power stations are described, for example, the requirement of high reliability, the measures to radioactivity and the aseismatic design. (Kako, I.)

  3. Reviewing nuclear power station achievement

    International Nuclear Information System (INIS)

    Howles, L.R.

    1976-01-01

    For measurement of nuclear power station achievement against original purchase the usual gross output figures are of little value since the term loosely covers many different definitions. An authentically designed output figure has been established which relates to net design output plus house load at full load. Based on these figures both cumulative and moving annual load factors are measured, the latter measuring the achievement over the last year, thus showing trends with time. Calculations have been carried out for all nuclear stations in the Western World with 150 MW(e) gross design output and above. From these are shown: moving annual load factor indicating relative station achievements for all the plants; cumulative load factors from which return of investment can be calculated; average moving annual load factors for the four types of system Magnox, PWR, HWR, and BWR; and a relative comparison of achievement by country in a few cases. (U.K.)

  4. Decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1988-01-01

    In the United Kingdom the Electricity Boards, the United Kingdom Atomic Energy Authority (UKAEA) and BNFL cooperate on all matters relating to the decommissioning of nuclear plant. The Central Electricity Generating Board's (CEGB) policy endorses the continuing need for nuclear power, the principle of reusing existing sites where possible and the building up of sufficient funds during the operating life of a nuclear power station to meet the cost of its complete clearance in the future. The safety of the plant is the responsibility of the licensee even in the decommissioning phase. The CEGB has carried out decommissioning studies on Magnox stations in general and Bradwell and Berkeley in particular. It has also been involved in the UKAEA Windscale AGR decommissioning programme. The options as to which stage to decommission to are considered. Methods, costs and waste management are also considered. (U.K.)

  5. 20 years of power station master training

    International Nuclear Information System (INIS)

    Schwarz, O.

    1977-01-01

    In the early fifties, the VGB working group 'Power station master training' elaborated plans for systematic and uniform training of power station operating personnel. In 1957, the first power station master course was held. In the meantime, 1.720 power station masters are in possession of a master's certificate of a chamber of commerce and trade. Furthermore, 53 power station masters have recently obtained in courses of the 'Kraftwerksschule e.V.' the know-how which enables them to also carry out their duty as a master in nuclear power stations. (orig.) [de

  6. Fire protection concept for power stations

    International Nuclear Information System (INIS)

    Zitzmann, H.

    The author shows how a systematic approach permits the design of a fire-protected power station. The special conditions of an individual power station are here treated as marginal conditions. The article describes how the concept is realized in the completed power station, taking account of the information provided by fire statistics. (orig.) [de

  7. Plant diagnostics in power stations

    International Nuclear Information System (INIS)

    Sturm, A.; Doering, D.

    1985-01-01

    The method of noise diagnostics is dealt with as a part of plant diagnostics in nuclear power stations. The following special applications are presented: (1) The modular noise diagnostics system is used for monitoring primary coolant circuits and detecting abnormal processes due to mechanical vibrations, loose parts or leaks. (2) The diagnostics of machines and plants with antifriction bearings is based on bearing vibration measurements. (3) The measurement of the friction moment by means of acoustic emission analysis is used for evaluating the operational state of slide bearings

  8. Local society and nuclear power stations

    International Nuclear Information System (INIS)

    1984-02-01

    This report was made by the expert committee on region investigation, Japan Atomic Industrial Forum Inc., in fiscal years 1981 and 1982 in order to grasp the social economic influence exerted on regions by the location of nuclear power stations and the actual state of the change due to it, and to search for the way the promotion of local community should be. The influence and the effect were measured in the regions around the Fukushima No. 1 Nuclear Power Station of Tokyo Electric Power Co., Inc., the Mihama Power Station of Kansai Electric Power Co., Inc., and the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc. The fundamental recognition in this discussion, the policy of locating nuclear power stations and the management of regions, the viewpoint and way of thinking in the investigation of the regions where nuclear power stations are located, the actual state of social economic impact due to the location of nuclear power stations, the connected mechanism accompanying the location of nuclear power stations, and the location of nuclear power stations and the acceleration of planning for regional promotion are reported. In order to economically generate electric power, the rationalization in the location of nuclear power stations is necessary, and the concrete concept of building up local community must be decided. (Kako, I.)

  9. Insurance of nuclear power stations

    International Nuclear Information System (INIS)

    Debaets, M.

    1992-01-01

    Electrical utility companies have invested large sums in the establishment of nuclear facilities. For this reason it is normal for these companies to attempt to protect their investments as much as possible. One of the methods of protection is recourse to insurance. For a variety of reasons traditional insurance markets are unable to function normally for a number of reasons including, the insufficient number of risks, an absence of meaningful accident statistics, the enormous sums involved and a lack of familiarity with nuclear risks on the part of insurers, resulting in a reluctance or even refusal to accept such risks. Insurers have, in response to requests for coverage from nuclear power station operators, established an alternative system of coverage - insurance through a system of insurance pools. Insurers in every country unite in a pool, providing a net capacity for every risk which is a capacity covered by their own funds, and consequently without reinsurance. All pools exchange capacity. The inconvenience of this system, for the operators in particular, is that it involves a monopolistic system in which there are consequently few possibilities for the negotiation of premiums and conditions of coverage. The system does not permit the establishment of reserves which could, over time, reduce the need for insurance on the part of nuclear power station operators. Thus the cost of nuclear insurance remains high. Alternatives to the poor system of insurance are explored in this article. (author)

  10. Flame visualization in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, H J.M.; Thus, A W; Verhage, A J.L. [KEMA - Fossil Power Plants, Arnhem (Netherlands)

    1993-01-01

    The shapes and temperature of flames in power stations, fired with powder coal and gas, have been measured optically. Spectral information in the visible and near infrared is used. Coal flames are visualized in the blue part of the spectrum, natural gas flames are viewed in the light of CH-emission. Temperatures of flames are derived from the best fit of the Planck-curve to the thermal radiation spectrum of coal and char, or to that of soot in the case of gas flames. A measuring method for the velocity distribution inside a gas flame is presented, employing pulsed alkali salt injection. It has been tested on a 100 kW natural gas flame. 3 refs., 9 figs.

  11. Simulators of nuclear power stations

    International Nuclear Information System (INIS)

    Zanobetti, D.

    1984-01-01

    The report deals with the simulators of nuclear power stations used for the training of operators and for the analysis of operations. It reviews the development of analogical, hybrid and digital simulators up to the present, indicating the impact resulting from the TMI-2 accident. It indicates, the components of simulators and the present accepted terminology for a classification of the various types of simulators. It reviews the present state of the art of the technology: how a basic mathematical model of a nuclear power system is worked out and what are the technical problems associated with more accurate models. Examples of elaborate models are given: for a PWR pressurizer, for an AGR steam generator. It also discusses certain problems of hardware technology. Characteristics of present replica simulators are given with certain details: simulated transient evolutions and malfunctions, accuracy of simulation. The work concerning the assessment of the validity of certain simulators is reported. A list of simulator manufacturers and a survey of the principal simulators in operation in the countries of the European Community, in the United States, and in certain other countries are presented. Problem associated with the use of simulators as training facilities, and their use as operational devices are discussed. Studies and research in progress for the expected future development of simulators are reviewed

  12. Water pollution and thermal power stations

    International Nuclear Information System (INIS)

    Maini, A.; Harapanahalli, A.B.

    1993-01-01

    There are a number of thermal power stations dotting the countryside in India for the generation of electricity. The pollution of environment is continuously increasing in the country with the addition of new coal based power stations and causing both a menace and a hazard to the biota. The paper reviews the problems arising out of water pollution from the coal based thermal power stations. (author). 2 tabs

  13. Sources of the wind power stations

    International Nuclear Information System (INIS)

    Chudivani, J.; Huettner, L.

    2012-01-01

    The paper deals with problems of the wind power stations. Describes the basic properties of wind energy. Shows and describes the different types of electrical machines used as a source of electricity in the wind power stations. Shows magnetic fields synchronous generator with salient poles and permanent magnets in the program FEMM. Describes methods for assessing of reversing the effects of the wind power stations on the distribution network. (Authors)

  14. 1100 MW BWR power station

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Now, the start-up test of No. 2 plant in Fukushima No. 2 Nuclear Power Station is smoothly in progress, and the start of its commercial operation is scheduled at the beginning of 1984. Here, the main features of No. 2 plant including piping design are explained. For No. 2 plant, many improving measures were adopted as the base plant of the improvement and standardization project of the Ministry of International Trade and Industry, such as the adoption of Mark-2 improved PCV, the adoption of an intermediate loop in the auxiliary cooling system, one-body forging of the lower end cover of the reactor pressure vessel, the adoption of many curved pipes, the adoption of large one-body structural components in reactor recirculation system piping and so on, which are related to the reduction of radiation exposure and the improvement of plant reliability in operation and regular inspection. Also, in order to do general adjustment in the arrangement of equipment and piping and in route design, and to establish the rational construction work plan, model engineering was adopted. In No. 2 plant, a remote-controlled automatic and semiautomatic ultrasonic flaw detection system was adopted to reduce radiation exposure in in-service inspection. Automatic welding was adopted to improve the quality. (Kako, I.)

  15. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  16. Beaver Valley Power Station and Shippingport Atomic Power Station. 1977 annual environmental report: radiological. Volume 2

    International Nuclear Information System (INIS)

    1978-01-01

    The environmental monitoring conducted during 1977 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station is described. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, river sediments, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Beaver Valley Power Station and Shippingport Atomic Power Station during 1977

  17. Reliability study of nuclear power stations

    International Nuclear Information System (INIS)

    Nemec, J.; Sedlacek, J.

    1975-01-01

    The paper considers the physical and mathematical bases underlying nuclear power station reliability from the standpoints of material fatigue, thermal yield and ageing. The risk of failure of nuclear power station components is determined by means of the Markov stochastic process

  18. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  19. Tokai earthquakes and Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Komura, Hiroo

    1981-01-01

    Kanto district and Shizuoka Prefecture are designated as ''Observation strengthening districts'', where the possibility of earthquake occurrence is high. Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., is at the center of this district. Nuclear power stations are vulnerable to earthquakes, and if damages are caused by earthquakes in nuclear power plants, the most dreadful accidents may occur. The Chubu Electric Power Co. underestimates the possibility and scale of earthquakes and the estimate of damages, and has kept on talking that the rock bed of the power station site is strong, and there is not the fear of accidents. However the actual situation is totally different from this. The description about earthquakes and the rock bed in the application of the installation of No.3 plant was totally rewritten after two years safety examination, and the Ministry of International Trade and Industry approved the application in less than two weeks thereafter. The rock bed is geologically evaluated in this paper, and many doubtful points in the application are pointed out. In addition, there are eight active faults near the power station site. The aseismatic design of the Hamaoka Nuclear Power Station assumes the acceleration up to 400 gal, but it may not be enough. The Hamaoka Nuclear Power Station is intentionally neglected in the estimate of damages in Shizuoka Prefecture. (Kako, I.)

  20. MHD power station with coal gasification

    International Nuclear Information System (INIS)

    Brzozowski, W.S.; Dul, J.; Pudlik, W.

    1976-01-01

    A description is given of the proposed operating method of a MHD-power station including a complete coal gasification into lean gas with a simultaneous partial gas production for the use of outside consumers. A comparison with coal gasification methods actually being used and full capabilities of power stations heated with coal-derived gas shows distinct advantages resulting from applying the method of coal gasification with waste heat from MHD generators working within the boundaries of the thermal-electric power station. (author)

  1. Environmental surveillance of PWR power stations

    International Nuclear Information System (INIS)

    Conti, M.

    1980-01-01

    The action of Electricite de France with respect to the environment of PWR nuclear power stations is essentially centred on prevention. Controls are carried out at two levels: - before the power station goes on stream (radioecological study), - when the power station is operational. The purpose of the controls effected on the radioactive effluents and the environment is to check that the maximum discharge rate stipulated in the corresponding orders is complied with and to ensure that there are no anomalies in the environment [fr

  2. Space power station. Uchu hatsuden

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, I. (Electrotechnical Laboratory, Tsukuba (Japan))

    1993-02-20

    A calculation tells that the amount of electric power the world will use in the future will require 100 to 500 power plants each with an output of 5-GW class. If this conception is true, it is beyond dispute that utilizing nuclear power will constitute a core of the power generation even though the geographical conditions are severe for nuclear power plants. It is also certain that power generation using clean solar energy will play important roles if power supply stability can be achieved. This paper describes plans to develop space solar power generation and space nuclear power generation that can supply power solving problems concerning geographical conditions and power supply stability. The space solar power generation is a system to arrest solar energy on a static orbit. According to a result of discussions in the U.S.A., the plan calls for solar cell sheets spread over the surface of a structure with a size of 5 km [times] 10 km [times] 0.5 km thick, and electric power obtained therefrom is transmitted to a rectenna with a size of 10 km [times] 13 km, a receiving antenna on the ground. The space nuclear power generation will be constructed similarly on a static orbit. Researches on space nuclear reactors have already begun. 10 refs., 8 figs., 1 tab.

  3. Sizewell B Power Station control dosimetry system

    International Nuclear Information System (INIS)

    Renn, G.

    1995-01-01

    Sizewell B Power Station is the first Pressurized Water Reactor (PWR) built in the UK for commercial electricity production. An effective control dosimetry system is a crucial tool, in allowing the station to assess its radiological performance against targets. This paper gives an overview of the control dosimetry system at Sizewell B and describes early operating experience with the system. (UK)

  4. Extension of life of nuclear power stations

    International Nuclear Information System (INIS)

    Takahashi, Hideaki

    1991-01-01

    At the time of designing nuclear power stations, as their service life, generally 40 years are taken, and the basic design specifications of machinery and equipment are determined. In USA where atomic energy has been developed, the new construction of nuclear power stations is cased for a while, however, if this situation continues as it is, since old power stations reach the service life of 40 years and are retired in near future, it is feared that the circumstance of the total amount of power generation becoming short will occur. As one of the countermeasures to this, the research on the extension of life of nuclear power stations has been carried out in many fields in USA, and it is expected that the application for extending the life for the power stations constructed in the initial period of development is submitted in 1991. The researches that have been carried out for solving the technical problems in this extension of life and the situation in Japan are reported. The NEC of USA decided that the operation period of nuclear power stations in USA, which is considered to be 40 years so far, can be extended up to the limit of 20 years. The background and circumstances of this problem in USA, Nuclear Plant Aging Research Program, Plant Life Extension Program and so on are reported. (K.I.)

  5. Valves and fittings for nuclear power stations

    International Nuclear Information System (INIS)

    1976-01-01

    The standard specifies technical requirements for valves and pipe fittings in nuclear power stations with PWR type reactors. Details of appropriate materials, welding, surface treatment for corrosion protection, painting, and complementary supply are given

  6. Anticorrosional protection in nuclear power station objects

    International Nuclear Information System (INIS)

    Czarnocki, A.; Kwiatkowski, A.

    1976-01-01

    The distribution and qualities of chemical protection and demands concerning preparation of the bottom for protecting coats in nuclear power station objects are discussed. The solutions of protections applied abroad and in the objects of ''MARIA'' reactor are presented. (author)

  7. Heating of water by nuclear power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The aim of this note is to examine: the thermal conditions of the Rhone in its present state; heating caused by the building of nuclear power stations; the main hydrobiological and ecological characteristics of the Rhone [fr

  8. Training of power station staff

    International Nuclear Information System (INIS)

    Dusserre, J.

    1993-01-01

    ELECTRICITE DE FRANCE currently operates 51 generating stations with 900 and 1300 MW Pressurized Water Reactors while, only 15 years ago, France possessed only a very small number of such stations. It was therefore vital to set up a major training organization to produce staff capable of starting, controlling and maintaining these facilities with a constant eye to improving quality and safety. Operator and maintenance staff training is based on highly-structured training plans designed to match both the post to be filled and the qualifications possessed by the person who is to fill it. It was essential to set up suitable high-performance training resources to handle this fast growth in staff. These resources are constantly being developed and allow EDF to make steady progress in a large number of areas, varying from the effects of human factors to the procedures to be followed during an accident

  9. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  10. Energy analysis of nuclear power stations

    International Nuclear Information System (INIS)

    Lindhout, A.H.

    1975-01-01

    A study based on a 1000MWe light water reactor power station was carried out to determine the total energy input and output of the power station. The calculations took into account the mining and processing of the ore, enrichment of the uranium, treatment of used nuclear fuel, investment in land, buildings, machinery, and transport. 144 tons of natural uranium produce 6100 million kWh (electric) and 340 million kWh (thermal) per annum. (J.S.)

  11. Principles of nuclear power station control

    International Nuclear Information System (INIS)

    Knowles, J.B.

    1975-12-01

    This memorandum represents lecture notes first distributed as part of a UKAEA introductory course on Reactor Technology held during November 1975. A nuclear power station is only one element of a dispersed interconnected arrangement of other nuclear and fossil-fired units which together constitute the national 'grid'. Thus the control of any one station must relate to the objectives of the grid network as a whole. A precise control of the supply frequency of the grid is achieved by regulating the output power of individual stations, and it is necessary for each station to be stable when operating in isolation with a variable load. As regards individual stations, several special control problems concerned with individual plant items are discussed, such as: controlled reactivity insertions, temperature reactivity time constants and flow instability. A simplified analysis establishes a fundamental relationship between the stored thermal energy of a boiler unit (a function of mechanical construction) and the flexibility of the heat source (nuclear or fossil-fired) if the station is to cope satisfactorily with demands arising from unscheduled losses of other generating sets or transmission capacity. Two basic control schemes for power station operation are described known as 'coupled' and 'decoupled control'. Each of the control modes has its own merits, which depend on the proposed station operating strategy (base load or load following) and the nature of the heat source. (U.K.)

  12. Starting of nuclear power stations

    International Nuclear Information System (INIS)

    Kotyza, V.

    1988-01-01

    The procedure is briefly characterized of jobs in nuclear power plant start-up and the differences are pointed out from those used in conventional power generation. Pressure tests are described oriented to tightness, tests of the secondary circuit and of the individual nodes and facilities. The possibility is shown of increased efficiency of such jobs on an example of the hydraulic tests of the second unit of the Dukovany nuclear power plant where the second and the third stages were combined in the so-colled integrated hydraulic test. (Z.M.). 5 figs

  13. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  14. Distributed systems for protecting nuclear power stations

    International Nuclear Information System (INIS)

    Jover, P.

    1980-05-01

    The advantages of distributed control systems for the control of nuclear power stations are obviously of great interest. Some years ago, EPRI, (Electric Power Research Institute) showed that multiplexing the signals is technically feasible, that it enables the availability specifications to be met and costs to be reduced. Since then, many distributed control systems have been proposed by the manufacturers. This note offers some comments on the application of the distribution concept to protection systems -what should be distributed- and ends with a brief description of a protection system based on microprocessors for the pressurized power stations now being built in France [fr

  15. Power station stack gas emissions

    International Nuclear Information System (INIS)

    Hunwick, Richard J.

    2006-01-01

    There are increasing awareness and pressure to reduce emissions of acid rain and photochemical smog. There is a need to produce new control system and equipment to capture those emissions. The most visible form of pollutions are the chimney smoke, dust and particles of fly ash from mineral matter in the fuel. Acid gases are hard on structures and objects containing limestone. Coal fired power generation is likely to be able to sustain its competitive advantage as a clean source of electricity in comparison with nuclear power and natural gas

  16. Nuclear power station achievement 1968-1980

    International Nuclear Information System (INIS)

    Howles, L.R.

    This report reviews and gives an analysis of the achievement of operating nuclear power stations in the Western world on three relevant bases: (1) both annual and cumulative achievement of all nuclear power stations at a particular time; (2) cumulative achievement of all nuclear power stations at the end of the first and subsequent years of their lives to show trends with age; (3) achievement based on refuelling period considerations. Nowhere in the report are any operating details ignored, omitted or eliminated in the method of analysis. Summarising the results of the reviews shows: an improvement with time from initial electricity generation on all bases; that initially, larger sizes of reactor/turbine operate less well than smaller sizes (except for PHWR's); that after an initial number of years, the largest size units operate as well as the intermediate and smaller sizes, or better in the PHWR case; that a 75 per cent cumulative load factor achievement in the middle years of a reactor/turbines life can be expected on the refuelling period considerations base; that at June 1980, 35 nuclear power stations achieved an annual load factor over 75 per cent; that the above achievement was possible despite the repercussions following the Three Mile Island 'accident' and the shutdowns in the USA for piping system seismic adequacy checks required by the Nuclear Regulatory Commission for five nuclear power stations; and that even when reactors/turbines are reaching towards the end of their design life, there is no rapid deterioration in their achievements. (author)

  17. Error management process for power stations

    International Nuclear Information System (INIS)

    Hirotsu, Yuko; Takeda, Daisuke; Fujimoto, Junzo; Nagasaka, Akihiko

    2016-01-01

    The purpose of this study is to establish 'error management process for power stations' for systematizing activities for human error prevention and for festering continuous improvement of these activities. The following are proposed by deriving concepts concerning error management process from existing knowledge and realizing them through application and evaluation of their effectiveness at a power station: an entire picture of error management process that facilitate four functions requisite for maraging human error prevention effectively (1. systematizing human error prevention tools, 2. identifying problems based on incident reports and taking corrective actions, 3. identifying good practices and potential problems for taking proactive measures, 4. prioritizeng human error prevention tools based on identified problems); detail steps for each activity (i.e. developing an annual plan for human error prevention, reporting and analyzing incidents and near misses) based on a model of human error causation; procedures and example of items for identifying gaps between current and desired levels of executions and outputs of each activity; stages for introducing and establishing the above proposed error management process into a power station. By giving shape to above proposals at a power station, systematization and continuous improvement of activities for human error prevention in line with the actual situation of the power station can be expected. (author)

  18. Socioeconomic impacts: nuclear power station siting

    International Nuclear Information System (INIS)

    1977-06-01

    The rural industrial development literature is used to gain insights on the socioeconomic effects of nuclear power stations. Previous studies of large industrial facilities in small towns have important implications for attempts to understand and anticipate the impacts of nuclear stations. Even a cursory review of the nuclear development literature, however, reveals that industrialization research in rural sociology, economic geography and agricultural economics has been largely ignored

  19. New Zealand's Clyde power station

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, J W; Black, J C; Foster, P F

    1987-12-01

    A 100 m-high mass concrete gravity dam, for the generation of 432 MW of power, is under construction at Clyde on the Clutha River in the South Island of New Zealand. A feature of the dam is the provision of a slip joint to allow up to 2 m of movement on the plane of a fault passing through the dam foundation. Details of the dam foundations, seismic design, river channel fault and slip joint, mass concrete, spillway and sluice, powerhouse, and landslide hazard at the site are given. 3 refs.

  20. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  1. Safety aspects of nuclear power stations

    International Nuclear Information System (INIS)

    Binner, W.

    1980-01-01

    Psychological aspects of the fear of nuclear power are discussed, cancer deaths due to a nuclear accident are predicted and the need for nuclear accident prevention is stressed. A simplified analysis of the safety precautions in a generalised nuclear power station is offered, with reference to loss-of-coolant incidents, and developments in reactor design for fail-safe modes are explained. The importance of learning from the Three Mile Island incident is noted and failure statistics are presented. Tasks to be undertaken at the Austrian Zwentendorf nuclear power station are listed, including improved quality control and acoustic detectors. Precautions against earthquakes are also discussed and it is stated that safe operation of the Zwentendorf station will be achieved. (G.M.E.)

  2. Can we afford shutting down power stations?

    International Nuclear Information System (INIS)

    Hesse, David

    2015-01-01

    The author discusses and criticizes some popular beliefs on the profitability of nuclear power stations, on the fact that they are now too old to be exploited, and on the fact that nuclear energy is the most subsidised energy. As some European countries decided to phase out nuclear, he notices that the decrease of gas prices undermines the profitability of nuclear power stations in the USA and that new rules aimed at the reduction of CO 2 emissions result in high subsidies for renewable energies which are however handicapped by the grid ability to integrate all energies. He outlines that shutting down a nuclear power station costs a lot of money to the society, and denies the argument of non-profitability of these stations. He states that the issue of nuclear subsidies is in fact a matter of tax policy. He also states that these so-said old power stations take in fact advantage of numerous technical innovations for their equipment, components, technology and fuels which improve their efficiency, durability, performance and flexibility

  3. Nuclear power generation modern power station practice

    CERN Document Server

    1971-01-01

    Nuclear Power Generation focuses on the use of nuclear reactors as heat sources for electricity generation. This volume explains how nuclear energy can be harnessed to produce power by discussing the fundamental physical facts and the properties of matter underlying the operation of a reactor. This book is comprised of five chapters and opens with an overview of nuclear physics, first by considering the structure of matter and basic physical concepts such as atomic structure and nuclear reactions. The second chapter deals with the requirements of a reactor as a heat source, along with the diff

  4. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  5. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  6. Aseismic foundation system for nuclear power stations

    International Nuclear Information System (INIS)

    Jolivet, F.; Richli, M.

    1977-01-01

    The aseismic foundation system, as described in this paper, is a new development, which makes it possible to build standard nuclear power stations in areas exposed to strong earthquakes. By adopting proven engineering concepts in design and construction of components, great advantages are achieved in the following areas: safety and reliability; efficiency; design schedule; cost. The need for an aseismic foundation system will arise more and more, as a large part of nuclear power station sites are located in highly seismic zones or must meet high intensity earthquake criteria due to the lack of historic data. (Auth.)

  7. Flame visualization in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, H J.M.; Thus, A W; Verhage, A J.L. [KEMA Fossil Generation, Arnhem (Netherlands)

    1994-01-01

    The study on the title subject is aimed at the determination of the form of the flame and the radiation temperature of the flames of the burners in electric power plants. The adjustment of the burners in a boiler is assessed on the basis of the total performance, in which the NO[sub x]- and CO-concentrations in the flue gases are normative. By comparing the burners mutually, deviating adjustments can be observed, applying optical monitoring techniques. Measurements have been carried out of the coal flames in the unit Gelderland13 of the Dutch energy production company EPON and of the gas flames at the Claus plant A and B of the Dutch energy company EPZ. The final aim of the title study is to draft guidelines, based on the measured flame data, by means of which for every individual burner the adjustment of the fuel supply, the relation with the air supply and the swirl of the combustion air can be optimized

  8. Plant computer system in nuclear power station

    International Nuclear Information System (INIS)

    Kato, Shinji; Fukuchi, Hiroshi

    1991-01-01

    In nuclear power stations, centrally concentrated monitoring system has been adopted, and in central control rooms, large quantity of information and operational equipments concentrate, therefore, those become the important place of communication between plants and operators. Further recently, due to the increase of the unit capacity, the strengthening of safety, the problems of man-machine interface and so on, it has become important to concentrate information, to automate machinery and equipment and to simplify them for improving the operational environment, reliability and so on. On the relation of nuclear power stations and computer system, to which attention has been paid recently as the man-machine interface, the example in Tsuruga Power Station, Japan Atomic Power Co. is shown. No.2 plant in the Tsuruga Power Station is a PWR plant with 1160 MWe output, which is a home built standardized plant, accordingly the computer system adopted here is explained. The fundamental concept of the central control board, the process computer system, the design policy, basic system configuration, reliability and maintenance, CRT display, and the computer system for No.1 BWR 357 MW plant are reported. (K.I.)

  9. Nuclear safeguards control in nuclear power stations

    International Nuclear Information System (INIS)

    Boedege, R.; Braatz, U.; Heger, H.

    1976-01-01

    The execution of the Non-Proliferation Treaty (NPT) has initiated a third phase in the efforts taken to ensure peace by limiting the number of atomic powers. In this phase it is important, above all, to turn into workable systems the conditions imposed upon technology by the different provisions of the Verification Agreement of the NPT. This is achieved mainly by elaborating annexes to the Agreement specifically geared to certain model plants, typical representatives selected for LWR power stations being the plants at Garigliano, Italy (BWR), and Stade, Federal Republic of Germany (PWR). The surveillance measures taken to prevent any diversion of special nuclear material for purposes of nuclear weapons manufacture must be effective in achieving their specific objective and must not impede the circumspect management of operations of the plants concerned. A VDEW working party has studied the technical details of the planned surveillance measures in nuclear power stations in the Federal Republic of Germany and now presents a concept of material balancing by units which meets the conditions imposed by the inspection authority and could also be accepted by the operators of nuclear power stations. The concept provides for uninterrupted control of the material balance areas of the nuclear power stations concerned, allows continuous control of the whole nuclear fuel cycle, is based exclusively on existing methods and facilities, and can be implemented at low cost. (orig.) [de

  10. Evaluation of scenery in power stations

    International Nuclear Information System (INIS)

    Wakatani, Yoshifumi; Yamamoto, Kimio

    1982-01-01

    In the location of power sources hereafter, the location in natural landscape away from urban district tends to increase, accordingly, it is necessary to investigate beforehand the influence to surrounding scenery. However, the method of predicting and evaluating the effect on scenery has not yet been established, therefore, in this study, the basic concept on the investigation, forecast and evaluation of the scenery in power stations was clarified, and the establishment of the work procedure to evaluate the scenery and the effectiveness of the method of forecast and evaluation were examined. Also, the problems when power station facilities exert influence on scenery and the countermeasures to them were considered. Psychological experiment was carried out on the method of evaluation, and the structure and the regulating factors of scenery evaluation were clarified. Recently, good living environment is desired by public, and to the problems of fine environment regarding power stations, more attention is paid. The scenery problems of power stations are the protection of nature and the preservation of good living environment. Since this is an undeveloped field, many problems to be examined still remain. (Kako, I.)

  11. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  12. Lunar base thermoelectric power station study

    Science.gov (United States)

    Determan, William; Frye, Patrick; Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, G.; Brooks, Michael D.; Heshmatpour, Ben

    2006-01-01

    Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology

  13. Studying dynamics of indicators of nuclear power stations exploitation (the case of US nuclear power stations)

    OpenAIRE

    Varshavsky, Leonid

    2013-01-01

    Analysis of external and internal factors influencing significant improvement of economic indicators of US nuclear power stations in the 1990s is carried out. Approaches to modeling dynamics of capacity factors of nuclear power stations are proposed. Comparative analysis of dynamics of capacity factors and occupational radiation exposure for various generations of US nuclear power plants is carried out. Dynamical characteristics of «learning by doing» effects for analyzed indicators are measu...

  14. Dosimetry systems in nuclear power stations

    International Nuclear Information System (INIS)

    Weidmann, U.

    1992-01-01

    In the following paper the necessity of the use of electronic dosimetry systems in nuclear power stations is presented, also encompassing the tasks which this type of systems has to fulfill. Based on examples the construction principles and the application possibilities of a PC supported system are described. 5 figs

  15. Process instrumentation for nuclear power station

    International Nuclear Information System (INIS)

    Yanai, Katsuya; Shinohara, Katsuhiko

    1978-01-01

    Nuclear power stations are the large scale compound system composed of many process systems. Accordingly, for the safe and high reliability operation of the plants, it is necessary to grasp the conditions of respective processes exactly and control the operation correctly. For this purpose, the process instrumentation undertakes the important function to monitor the plant operation. Hitachi Ltd. has exerted ceaseless efforts since long before to establish the basic technology for the process instrumentation in nuclear power stations, to develop and improve hardwares of high reliability, and to establish the quality control system. As for the features of the process instrumentation in nuclear power stations, the enormous quantity of measurement, the diversity of measured variables, the remote measurement and monitoring method, and the ensuring of high reliability are enumerated. Also the hardwares must withstand earthquakes, loss of coolant accidents, radiations, leaks and fires. Hitachi Unitrol Sigma Series is the measurement system which is suitable to the general process instrumentation in nuclear power stations, and satisfies sufficiently the basic requirements described above. It has various features as the nuclear energy system, such as high reliability by the use of ICs, the methods of calculation and transmission considering signal linkage, loop controller system and small size. HIACS-1000 Series is the analog controller of high reliability for water control. (Kako, I.)

  16. Water turbine technology for small power stations

    Science.gov (United States)

    Salovaara, T.

    1980-02-01

    The paper examines hydro-power stations and the efficiency and costs of using water turbines to run them. Attention is given to different turbine types emphasizing the use of Kaplan-turbines and runners. Hydraulic characteristics and mechanical properties of low head turbines and small turbines, constructed of fully fabricated steel plate structures, are presented.

  17. Protection and safety of nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The extreme requirements for the safety of nuclear power stations set tasks to the civil engineer which, resulting from dynamic load assumptions, among other things also demand the development of novel special concrete steels with a high elastic limit (here: DYWIDAG thread tie rod) for singly reinforced members. (orig.) [de

  18. Impact studies and nuclear power stations

    International Nuclear Information System (INIS)

    Chambolle, Thierry

    1981-01-01

    Impact studies form an essential part of environmental protection. The impact study discipline has enabled the EDF to have a better understanding of the effects of nuclear power stations on the environment and to remedy them at the project design stage [fr

  19. Reliability models for Space Station power system

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kim, Y.; Wagner, H.

    1987-01-01

    This paper presents a methodology for the reliability evaluation of Space Station power system. The two options considered are the photovoltaic system and the solar dynamic system. Reliability models for both of these options are described along with the methodology for calculating the reliability indices.

  20. Reducing nitrogen oxides from power stations

    International Nuclear Information System (INIS)

    Scheller, W.

    1986-12-01

    The report contains 17 individual lectures of the seminar included in databanks. The lectures concern combustion and waste gas measures for reducing the sulfur dioxide and nitrogen oxide emission from coal-fired and gas-fired power stations. (PW) [de

  1. Toluene stability Space Station Rankine power system

    Science.gov (United States)

    Havens, V. N.; Ragaller, D. R.; Sibert, L.; Miller, D.

    1987-01-01

    A dynamic test loop is designed to evaluate the thermal stability of an organic Rankine cycle working fluid, toluene, for potential application to the Space Station power conversion unit. Samples of the noncondensible gases and the liquid toluene were taken periodically during the 3410 hour test at 750 F peak temperature. The results obtained from the toluene stability loop verify that toluene degradation will not lead to a loss of performance over the 30-year Space Station mission life requirement. The identity of the degradation products and the low rates of formation were as expected from toluene capsule test data.

  2. Practical design considerations for photovoltaic power station

    Science.gov (United States)

    Swanson, T. D.

    Aspects of photovoltaic (PV) technology are discussed along with generic PV design considerations, taking into account the resource sunlight, PV modules and their reliability, questions of PV system design, the support structure subsystem, and a power conditioning unit subsystem. A description is presented of two recent projects which demonstrate the translation of an idea into actual working PV systems. A privately financed project in Denton, Maryland, went on line in early December, 1982, and began providing power to the local utility grid. It represents the first intermediate size, grid-connected, privately financed power station in the U.S. Based on firm quotes, the actual cost of this system is about $13/W peak. The other project, called the PV Breeder, is an energy independent facility which utilizes solar power to make new solar cells. It is also the first large industrial structure completely powered by the sun.

  3. Operating experience at Scottish Nuclear's power stations

    International Nuclear Information System (INIS)

    Blackburn, P.

    1991-01-01

    A brief history is presented of the design and operation of the four Scottish nuclear power stations currently run by Scottish Nuclear, namely Hunterston 'A' and 'B' and the Torness reactors. A design flaw in the Magnox reactor at Hunterston 'A' led to it being operated at lower than optimal temperature and hence producing less power. For Hunterston 'B' reactor the Advanced Gas Cooled design prototype was used. Operating setbacks and successes are noted. The design chosen for Torness embraced all the good points of Hunterston 'B' but sought to eliminate its faults. After 26 years of successful operation Hunterston 'A' is now being decommissioned, while the other three stations continue to generate electricity successfully. (UK)

  4. Safety planning for nuclear power stations

    International Nuclear Information System (INIS)

    Tadmor, J.

    1979-01-01

    The article shows that compared to the many industries and other human activities, nuclear power stations are among the safest. A short description of the measures taken to prevent accidents and of the additional safety means entering into action if an accident does occur is presented. It is shown that in nuclear plants the death frequency following malfunctioning is 1 death in 100.000 years whereas deaths following other human activities is 1 in 2 to 100 years and following natural calamities like earthquakes and floods is 1 in 10 years. As an example it is shown that for a population of 15.000.000 living in a radius of 40 km around 100 power stations the average number of deaths will be of 2 per year as compared to 4200 from road accidents with the corresponding number of injuries of 20 and 375.000 respectively. (B.G.)

  5. Dynamics and control in nuclear power stations

    International Nuclear Information System (INIS)

    Butterfield, M.H.

    1992-01-01

    This volume presents a wide view of aspects of control of nuclear power stations by taking into consideration the plant as a whole and the protection systems employed therein. Authors with worldwide experience consider all aspects of dynamics and control in the context of both fast and thermal power stations. The topics discussed include the methods of development and applications within the analysis of plant behaviour, the validation of mathematical models, plant testing, and the design and implementation of controls. There are 27 papers all of which are indexed separately; steady states and model evolution (5 papers), control and protection systems (5 papers), transients (7 papers), testing and data (3 papers), model validation (6 papers) and commissioning and operation (1 paper). (author)

  6. The decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Barker, F.

    1992-01-01

    This report has been commissioned by the National Steering Committee of Nuclear Free Local Authorities to provide: a comprehensive introduction to the technical, social, political, environmental and economic dimensions to nuclear power station decommissioning; an independent analysis of Nuclear Electric's recent change of decommissioning strategy; the case for wider public involvement in decision making about decommissioning; and a preliminary assessment of the potential mechanisms for achieving that essential wider public involvement

  7. Technological development of Guangdong nuclear power station

    International Nuclear Information System (INIS)

    Huang Shiqiang

    2000-01-01

    After over 5 years of operations, the Guangdong Nuclear Power Station (GNPS) has achieved good results both economically and in operational safety performance. The main attributes to the success of the plant operational performances include the equipment reliability, the technical capability and management efficiency. To that the key strategy has been to adopt know-how and technological transfer and encourage self-innovation, aiming to strive for the long-term self-reliance in design, manufacturing and operating the plant. (author)

  8. Requirement profile for nuclear power station personnel

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1984-01-01

    The starting point in deriving the requirement profile for the shift personnel in the control rooms of nuclear power stations is information of a technical, organisational and ergonomic kind. The technique used, the distribution of work to different work areas and the configuration of the workplace is determined by the tasks and the environmental conditions in which they have to be done. (orig./DG) [de

  9. Front against the Temelin nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Though the main concern of the author is the Czechoslovakian Temelin power station, the main target of his attacks are the Austrian proponents of nuclear energy i.e. the Reactor Safty Commission and the Austrian Chancellor. The newly opened possibility of anti-nuclear propaganda in the CSFR, by Greenpeace and the author's organisation is welcomed. The number of signatures collected against Temelin is given as 350.000. 815 signatures come from Japan: a facsimile of some Japanese signatures is presented

  10. Thermodynamic power stations at low temperatures

    Science.gov (United States)

    Malherbe, J.; Ployart, R.; Alleau, T.; Bandelier, P.; Lauro, F.

    The development of low-temperature thermodynamic power stations using solar energy is considered, with special attention given to the choice of the thermodynamic cycle (Rankine), working fluids (frigorific halogen compounds), and heat exchangers. Thermomechanical conversion machines, such as ac motors and rotating volumetric motors are discussed. A system is recommended for the use of solar energy for irrigation and pumping in remote areas. Other applications include the production of cold of fresh water from brackish waters, and energy recovery from hot springs.

  11. Efficiency of a small wind power station

    International Nuclear Information System (INIS)

    Ivanov, K.; Christov, Ch.; Kozarev, N.

    2001-01-01

    The aim of the study is to obtain the optimal solution for wind station both by technical parameters and costs. The energetic characteristics of the wind as a renewable energy source are discussed and assessment of the economical efficiency is made. For the determination of the optimal wind parameters the method of integral wind curves is used. The low power wind generators (0.4 - 1.5 kW) are considered as optimal for the presented wind characteristics

  12. Community reaction to noise from power stations

    International Nuclear Information System (INIS)

    Job, R.F.S.; Hede, A.J.

    1989-01-01

    Community reaction is a major consideration in noise control. The relationship between noise exposure and community reaction has received considerable attention in relation to railway, traffic, aircraft and impulsive noise. The results have shown a number of features in common, including: similarly shaped noise/reaction functions; similar results across different measurement techniques and cultures, noise/reaction correlations based on individual respondent data are low (mean r = 0.42 ± 0.12: Job, 1988), although correlations of .58 and above have been reported correlations based on data grouped by noise exposure are generally high and relatively unaffected by the type of noise studied whereas correlations based on individual data tend to be lower for impulsive noise than for transportation noise attitude to the noise source and sensitivity to noise shows strong correlations with reaction. This paper reports that the present study was undertaken in order toe establish over a wider range of noise exposure whether community reaction to power station noise is similar to reaction to other types of non-impulsive noise. It is possible that reaction is different given important differences in the source of the noise which may affect attitude. Attitudes towards power stations may be more positive than attitudes to aircraft or rail noise for example, because almost all respondents use electricity regularly every day. Further, the power stations in the present study provided employment for the relatively small surrounding communities

  13. Circulating water pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Satoh, Hiroshi; Ohmori, Tsuneaki

    1979-01-01

    Shortly, the nuclear power station with unit power output of 1100 MW will begin the operation, and the circulating water pumps manufactured recently are those of 2.4 to 4 m bore, 840 to 2170 m 3 /min discharge and 2100 to 5100 kW driving power. The circulating water pumps are one of important auxiliary machines, because if they fail, power generation capacity lowers immediately. Enormous quantity of cooling water is required to cool condensers, therefore in Japan, sea water is usually used. As siphon is formed in circulating water pipes, the total head of the pumps is not very high. The discharge of the pumps is determined so as to keep the temperature rise of discharged water lower than 7 deg. C. The quantity of cooling water for nuclear power generation is about 50% more as compared with thermal power generation because of the difference in steam conditions. The total head of the pumps is normally from 8 to 15 m. The circulating water pumps rarely stop after they started the operation, therefore it is economical to determine the motor power so that it can withstand 10% overload for a short period, instead of large power. At present, vertical shaft, oblique flow circulating water pumps are usually employed. Recently, movable blade pumps are adopted. The installation, construction and materials of the pumps and the problems are described. (Kako, I.)

  14. SUBSTANTIATION AND EXPERIENCE OF THE VARICELLA VACCINE USAGE IN VOLGOGRAD

    Directory of Open Access Journals (Sweden)

    L. V. Kramar’

    2012-01-01

    Full Text Available The authors analyse the varicella morbidity in Volgograd. The main markers of the severity of the disease course in children are estimated retrospectively. Also the economical costs of the indoor patients treatment and annual economical losses are assessed. The article contains the results of the realization of the regional programme «Vaccination», during which 14 000 children were vaccinated with «Okavax». This programme showed both high efficiency and safety.

  15. Care management at Ikata Power Station

    International Nuclear Information System (INIS)

    Sakai, Koji

    1982-01-01

    For operating nuclear power stations safely and economically, it is necessary to control nuclear fuel itself and reactor cores. Nuclear fuel must be controlled consistently in view of quantitative balance and operational method over the whole nuclear fuel cycle of uranium ore, fabrication, burning in reactors and reprocessing, based on the plan of using fuel in electric power companies. The control of the burning in reactors is called core management, and it is important because the users of fuel execute it. For dealing with such core management works, Shikoku Electric Power Co., Inc., has developed the computer code system for grasping the state of fuel exchange and the burning condition in reactors and used it since 1972. The outline of the core management in Ikata Power Station is reported in this paper centering around computing works. The core management works are divided into those at the time of regular inspection and those in operation. In the regular inspection, fuel inspection, fuel exchange and reactor physics test are performed. In operation, the burning condition of fuel is grasped. The technical computations corresponding to these works are explained, and the examples of computations are shown. (Kako, I.)

  16. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  17. Vacuum switchgear for power station auxiliary switchboards

    International Nuclear Information System (INIS)

    Coombs, P.E.

    1992-01-01

    Sizewell B is the first UK power station in which vacuum switchgear is used for the auxiliary switchboards. Previously the 3.3kV, 6.6kV or 11kV switchgear has used air-break circuit breakers and fused air-break contactors, known as motor starting devices or fused switching devices (FSD). The use of vacuum interrupters is therefore a new technology in this application, although it has been established in the UK distribution network and in industrial installations from the mid 1970s. Vacuum switchgear was already in use in the USA for power station auxiliary switchgear at the time that it was proposed for Sizewell B. The Sizewell B high voltage auxiliary switchgear comprises eight Unit and Station Auxiliary Switchboards at 3.3kV and 11kV, and four 3.3kV Essential Switchboards for the essential safety related circuits, making a total of 65 circuit breakers plus FSD panels. (Author)

  18. Managing nuclear power stations for success

    International Nuclear Information System (INIS)

    Smith, G.

    2006-01-01

    Ontario Power Generation's (OPG) top operational priority is to manage its nuclear assets to ensure they operate as safely, efficiently and cost effectively as possible. In meeting these objectives, the company is focused on continuously improving its nuclear performance and benchmarking that performance against the best in North America. This presentation explores how OPG is improving its nuclear performance and the steps it is taking to sustain performance success going forward. Topics to be discussed include the measures OPG is taking to enhance human performance and station reliability as well as the company's preparations to determine if a business case exists for extending the lives of the Pickering B and eventually the Darlington nuclear stations. (author)

  19. Lifetime management of Magnox power stations

    International Nuclear Information System (INIS)

    Smitton, C.

    1998-01-01

    Magnox Electric, which is, a subsidiary of BNFL, operates six nuclear power plants that have an average age of about 33 years. The procedures developed to maintain the plants and ensure nuclear safety in longer-term operation are reviewed. The technical limit on station lifetimes is expected to be determined by the effect of ageing on major reactor structures where replacement is impractical. Examination of the effect of ageing confirms that the stations are capable of operating to a life of at least 40 years. The economic factors affecting operation are reviewed, recognising the need to sell electricity in a competitive market. Recently Magnox Electric and BNFL have merged and all plant supporting Magnox operations are now within a single integrated company that will provide further opportunities for improved efficiency. (author)

  20. Dealing with operational power station wastes

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, R B [Central Electricity Generating Board, London (UK). Nuclear Health and Safety Dept.

    1981-08-01

    The disposal of wastes from nuclear power stations is discussed. Liquid and gaseous wastes, from magnox stations, which are of low level activity, are dispersed to the sea or estuaries on coastal sites or for the case of Trawfynyeld, to the nearby lake. Low activity solid wastes are either disposed of on local authority tips or in shallow land burial sites. Intermediate level wastes, consisting mainly of wet materials such as filter sludges and resins from cooling ponds, are at present stored in shielded storage tanks either dry or under water. Only one disposal route for intermediate waste is used by Britain, namely, sea-dumping. Materials for sea dumping have to be encapsulated in a durable material for example, concrete.

  1. ALARA organization in nuclear power stations

    International Nuclear Information System (INIS)

    Dollo, R.

    1997-01-01

    EDF's nuclear power stations were built with provisions being made, as from the design stage, to limit radiation sources and the results observed over the first ten years (annual collective dose and dose per unit of less than 2 man.Sv) were considered to be very good. However, these results began to deteriorate from 1988 onwards. At the same time, considerable progress was being made by other generators of electricity, who were achieving results which were better than those achieved by our later units. Furthermore, radiological protection standards are being revised and personal dose limits will soon be lowered. (authors)

  2. Economical dismantling of nuclear power stations

    International Nuclear Information System (INIS)

    Mallok, J.; Andermann, H.

    1999-01-01

    The dismantling of nuclear power stations requires a high degree of security and economic efficiency due to the strong contamination of components and the close spatial conditions. In order to protect involved staff from radiation, modern remote-controlled technology is applied in sectors with heavy radioactive contamination such as reactor pressure vessels. The article shows, that the dismantling of reactor pressure vessels using a remote-controlled milling machine developed by the Siemens subsidiary Mechanik Center Erlangen GmbH, can be done in a secure and efficient way. (orig.) [de

  3. Multivariable control in nuclear power stations

    International Nuclear Information System (INIS)

    Parent, M.; McMorran, P.D.

    1982-11-01

    Multivariable methods have the potential to improve the control of large systems such as nuclear power stations. Linear-quadratic optimal control is a multivariable method based on the minimization of a cost function. A related technique leads to the Kalman filter for estimation of plant state from noisy measurements. A design program for optimal control and Kalman filtering has been developed as part of a computer-aided design package for multivariable control systems. The method is demonstrated on a model of a nuclear steam generator, and simulated results are presented

  4. Pilot plant experiments at Wairakei Power Station

    International Nuclear Information System (INIS)

    Brown, Kevin L.; Bacon, Lew G.

    2009-01-01

    In the mid-1990s, several pilot plants were constructed at Wairakei to either improve the operational and economic performance of the power station or to mitigate the environmental effects of discharges to the Waikato River. The results of the following investigations are discussed: (1) fluid flow dynamic effects on silica scaling; (2) production of silica sols of predetermined particle size to evaluate the potential for generating commercial grade silica products; (3) use of 'sulfur oxidising bacteria' for the abatement of dissolved hydrogen sulphide in cooling water; (4) removal of arsenic from separated geothermal water; (5) steam line condensate corrosion; and (6) measurement and modelling of steam scrubbing in Wairakei's long steamlines. (author)

  5. CEGB nuclear power stations basic emergency plan

    International Nuclear Information System (INIS)

    1978-03-01

    The introduction states that this is a typical emergency plan for a nuclear power station employing about 500 people, having two reactors and a total electrical output of 500 Megawatts in an intensively farmed rural area. The document has the following headings: definitions ('site incident', etc); functions of the site emergency organization; conditions for taking emergency action; persons empowered to declare or cancel a site incident or an emergency; emergency actions by staff; control centres; communication; collaboration with other bodies; warnings; transport; house rules; public information centre. (U.K.)

  6. thermal power stations' reliability evaluation in a hydrothermal system

    African Journals Online (AJOL)

    Dr Obe

    A quantitative tool for the evaluation of thermal power stations reliability in a hydrothermal system is presented. ... (solar power); wind (wind power) and the rest, thermal power and ... probability of a system performing its function adequately for ...

  7. Solar dynamic power systems for space station

    Science.gov (United States)

    Irvine, Thomas B.; Nall, Marsha M.; Seidel, Robert C.

    1986-01-01

    The Parabolic Offset Linearly Actuated Reflector (POLAR) solar dynamic module was selected as the baseline design for a solar dynamic power system aboard the space station. The POLAR concept was chosen over other candidate designs after extensive trade studies. The primary advantages of the POLAR concept are the low mass moment of inertia of the module about the transverse boom and the compactness of the stowed module which enables packaging of two complete modules in the Shuttle orbiter payload bay. The fine pointing control system required for the solar dynamic module has been studied and initial results indicate that if disturbances from the station are allowed to back drive the rotary alpha joint, pointing errors caused by transient loads on the space station can be minimized. This would allow pointing controls to operate in bandwidths near system structural frequencies. The incorporation of the fine pointing control system into the solar dynamic module is fairly straightforward for the three strut concentrator support structure. However, results of structural analyses indicate that this three strut support is not optimum. Incorporation of a vernier pointing system into the proposed six strut support structure is being studied.

  8. Slovak power stations (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Slovak power stations, s.a. (SE) in 1997 is presented. These activities are reported under the headings: (1) Foreword of the chairman of the Board of directors; (2) Highlights of 1997; (3) Board of directors; (4) Supervisory board; (5) Organisation structure of SE; (6) Branches of SE; (7) Auditor's report; (8) Balance sheet / Economic balance; (9) Economic results; (10) Analysis of economic result; (11) SE capital investment in other trade companies; (12) Basic data; (13) Management and operation of the Slovak Republic's power system; (14) Labour safety and health, fire protection; (15) Electricity trade; (16) Trade heat; (17) Customer services provided to electricity users (18) Investment programme; (19) Environmental protection; (20) Support of renewable; (21) Nuclear safety; (22) Quality system; (23) International co-operation; (24) Centrel; (25) Information technology; (26) Public relations; (27) Business strategy and development programme; (28) Strategic change programme

  9. Iodine filters in nuclear power stations

    International Nuclear Information System (INIS)

    Wilhelm, J.G.

    1977-04-01

    On the basis of calculated and recorded release rates of nuclear power plants, the significance of iodine releases in the invironmental impact relative to other nuclides is discussed. The release pathways for iodine in LWR-type reactors and the efficiency of various methods to lower the activity release are given. The airborne species of iodine are discussed with regard to their removal in iodine sorption filters and environmental impact. The technical status of iodine removal by means of iodine sorption filters is studied for normal operation and accident conditions in nuclear power stations on the basis of the data given in the relevant literature for the efficiency of a number of iodine sorption materials. The applicability of concepts for ventilation and containment and their influence on iodine filter systems are discussed. Design, structure, and testing of iodine sorption filters are treated in detail; recommendations for design are given, and failure sources are mentioned. (orig.) [de

  10. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  11. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  12. Regulatory experience in nuclear power station decommissioning

    International Nuclear Information System (INIS)

    Ross, W.M.; Waters, R.E.; Taylor, F.E.; Burrows, P.I.

    1995-01-01

    In the UK, decommissioning on a licensed nuclear site is regulated and controlled by HM Nuclear Installations Inspectorate on behalf of the Health and Safety Executive. The same legislative framework used for operating nuclear power stations is also applied to decommissioning activities and provides a continuous but flexible safety regime until there is no danger from ionising radiations. The regulatory strategy is discussed, taking into account Government policy and international guidance for decommissioning and the implications of the recent white paper reviewing radioactive waste management policy. Although each site is treated on a case by case basis as regulatory experience is gained from decommissioning commercial nuclear power stations in the UK, generic issues have been identified and current regulatory thinking on them is indicated. Overall it is concluded that decommissioning is an evolving process where dismantling and waste disposal should be carried out as soon as reasonably practicable. Waste stored on site should, where it is practical and cost effective, be in a state of passive safety. (Author)

  13. Siting technology of underground nuclear power station

    International Nuclear Information System (INIS)

    Motojima, M.; Hibino, S.

    1989-01-01

    For the site of a nuclear power station, it may be possible to select a seaside mountain area, if the condition is suitable to excavate large rock caverns in which a reactor and other equipments are installed. As the case study on the siting technology for an underground nuclear power station, the following example was investigated. The site is a seaside steep mountain area, and almost all the equipments are installed in plural tunnel type caverns. The depth from the ground surface to the top of the reactor cavern is about 150 m, and the thickness of the rock pillar between the reactor cavern of 33 m W x 82 mH x 79 mD and the neighboring turbine cavern is 60 m. In this paper, the stability of rock caverns in this example, evaluated by numerical analysis, is described. The numerical analysis was carried out on the central cross section of the reactor cavern, taking the turbine cavern, geostress, the mechanical properties of rock mass and the process of excavation works in consideration. By the analysis, the underground caverns in this example were evaluated as stable, if the rock quality is equivalent to C H class or better according to the CRIEPI rock classification. (K.I.)

  14. Fire safety in nuclear power stations

    International Nuclear Information System (INIS)

    Kench, R.L.

    1988-01-01

    This is the first of a three-part report on the fire hazards in nuclear power stations and some of the precautions necessary. This part lists the United Kingdom reactors, outlines how they work, the fuels used, the use of moderators and coolants and the control systems. Although the risk of fire is no higher than in fossil-fuel stations the consequences can be more serious. The radioactive materials used mean that there is biological shielding round the core, limitations on waste emissions allowed and limited access to some zones. Reliable shut-down systems are needed. Care in the use of water to fight fires must be exercised -it can act as a moderator and cause an otherwise safe core to go critical. The Wigner effect in graphite moderated reactors is explained. Fires in graphite can be extinguished by carbon dioxide. Argon, chlorine and sodium silicate can also be effective. In sodium cooled reactors fires can be allowed to burn themselves out, or TEC and argon could be used to extinguish the flame. (UK)

  15. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Arnold, P.J.

    1982-11-01

    The systems benefits of the selection of the Sizewell site for a PWR power station are dealt with. The transmission modifications which would be needed to provide effective connection of this station to the system are considered. (U.K.)

  16. Operating experience of Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Ohteru, Shigeru; Kaneko, Jun; Kawahara, Toshio; Matsumoto, Mitsuo

    1987-01-01

    The prototype ATR 'Fugen' developed as one of the national project has verified the performance and reliability of the advanced thermal reactor system through the operation for about eight years since 1979, and the elucidation of the characteristics in plutonium utilization and the development and verification of the tuilizing techniques have been advanced. Besides, the operational results and the achievement of the technical development are successively reflected to the design of a demonstration reactor. In this paper, the outline of Fugan and the operational results are reported. The ATR Fugen Power Station is that of the prototype reactor of heavy water moderated, boiling light water cooled, pressure tube type, having the electric output of 165 MW. It started the full scale operation on March 20, 1979, and as of January, 1987, the total generated electric power reached about 7 billion kWh, the time of power generation was about 43,000 h, and the average capacity factor was 60.6 %. Plutonium utilization techniques, the flow characteristics and the dynamic plant characteristics of a pressure tube type reactor, the operational characteristics of a heavy water system and the techniques of handling heavy water containing tritium, and the operational reliability and maintainability of the machinery and equipment installed have been studied. (Kako, I.)

  17. Nuclear power station main control room habitability

    International Nuclear Information System (INIS)

    Paschal, W.B.; Knous, W.S.

    1989-01-01

    The main control room at a nuclear power station must remain habitable during a variety of plant conditions and postulated events. The control room habitability requirement and the function of the heating, ventilating, air-conditioning, and air treatment system are to control environmental factors, such as temperature, pressure, humidity, radiation, and toxic gas. Habitability requirements provide for the safety of personnel and enable operation of equipment required to function in the main control room. Habitability as an issue has been gaining prominence with the Advisor Committee of Reactor Safeguards and the Nuclear Regulatory Commission since the incident at Three Mile Island. Their concern is the ability of the presently installed habitability systems to control the main control room environment after an accident. This paper discusses main control room HVAC systems; the concern, requirements, and results of NRC surveys and notices; and an approach to control room habitability reviews

  18. Basic conditions of innovative development of Volgograd suburban zone

    Directory of Open Access Journals (Sweden)

    Beljaev Mihail Konstantinovich

    2015-03-01

    The article identified and described the factors in the development of modern suburban zones at the macro level (international conditions, changing the types and sources of economic growth, changing the types of socio-economic systems; at the meso level (state socio-economic policy, regional socio-economic policy, the policy of local self-government; at the micro level (natural, production, research, educational, investment, infrastructure, administrative, labor, cultural-historical and information potentials. The main competitive advantages of Volgograd suburban zone are the natural and cultural-historical conditions, the main problems are organizational management, investment, research factors of development.

  19. Living near a nuclear power station

    International Nuclear Information System (INIS)

    Marcan, P.; Slovak, K.

    2007-01-01

    The need to expand nuclear power and its advantages are discussed publicly nearly each week. According to politicians and the nuclear lobby investing tens of billions Sk at Mochovce will bring Slovakia the often cited 'independence and energy self-sufficiency'. It will also mean profit for Slovenske elektrarne and the company's shareholders - the state and Italian company, Enel. In addition to the lively discussion on the pros and cons of nuclear energy, TREND was also interested in the living conditions around the concrete and strictly guarded, potentially dangerous plants and in the opinion of the people most affected by Mochovce and Jaslovske Bohunice on expansion of the existing and the building of new nuclear power plants. The construction of nuclear powers stations in these regions was not only about new jobs. The state 'prescribed' iodine pills and did not allow any construction in the region and, in the case of Mochovce, ordered the complete demolition of a village. The only thing that remained from Mochovce village was the church. 'And when it was found that the power plant would not reach it, it was even given a new roof. Former inhabitants, especially the older ones that had problems accepting the evacuation, used to visit it often,' explained Jan Foldy, the head of the local municipality in Kalna nad Hronom. After many years, life in the neighbouring villages is not bad. Their budgets are overflowing and so they can afford to spoil their inhabitants with free cable TV and high standard sport facilities, which should partly compensate for the fact that the people are living so close to a nuclear facility. (authors)

  20. Valves for condenser-cooling-water circulating piping in thermal power station and nuclear power station

    International Nuclear Information System (INIS)

    Kondo, Sumio

    1977-01-01

    Sea water is mostly used as condenser cooling water in thermal and nuclear power stations in Japan. The quantity of cooling water is 6 to 7 t/sec per 100,000 kW output in nuclear power stations, and 3 to 4 t/sec in thermal power stations. The pipe diameter is 900 to 2,700 mm for the power output of 75,000 to 1,100,000 kW. The valves used are mostly butterfly valves, and the reliability, economy and maintainability must be examined sufficiently because of their important role. The construction, number and arrangement of the valves around a condenser are different according to the types of a turbine and the condenser and reverse flow washing method. Three types are illustrated. The valves for sea water are subjected to the electrochemical corrosion due to sea water, the local corrosion due to stagnant water, the fouling by marine organisms, the cavitation due to valve operation, and the erosion by earth and sand. The fundamental construction, use and features of butterfly valves are described. The cases of the failure and repair of the valves after their delivery are shown, and they are the corrosion of valve bodies and valve seats, and the separation of coating and lining. The newly developed butterfly valve with overall water-tight rubber lining is introduced. (Kako, I.)

  1. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  2. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  3. User Context Aware Base Station Power Flow Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  4. Increasing the efficiency of thermal power stations

    International Nuclear Information System (INIS)

    Schwarz, N.F.

    1984-01-01

    High energy prices and an increased investment of costs in power plants as well as the necessity to minimize all kinds of environmental pollution have severe consequences on the construction and operation of thermal power stations. One of the most promising measures to cope with the mentioned problems is to raise the thermal efficiency of power plants. With the example of an Austrian electric utility it can be shown that by application of high efficiency combined cycles primary energy can be converted into electricity in a most efficient manner. Excellent operating experience has proved the high reliability of these relatively complex systems. Raising the temperature of the gas topping process still higher will not raise the efficiency considerably. In this respect a Rankine cycle is superior to a Brayton cycle. In a temperature range of 850 to 900 0 C were conventional materials with known properties can still be used, only the alkali metals cesium and potassium have the necessary physical and thermodynamic properties for application in Rankine topping cycles. Building on experience gained in the Fast Breeder development and from the US space program, a potassium topping cycle linked to a conventional water steam cycle with an intermediate diphenyl vapour cycle has been proposed which should give thermal efficiencies in excess of 50%. In a multi-national program this so called Treble Rankine Cycle is being investigated under the auspices of the International Energy Agency. Work is in progress to investigate the technical and economic feasibility of this energy conversion system. Experimental investigations are already under way in the Austrian Research Center Seibersdorf where high temperature liquid metal test facilities have been operated since 1968. (Author)

  5. On the development of small nuclear power stations

    International Nuclear Information System (INIS)

    Goetzmann, C.A.

    1989-01-01

    There are weighty reasons for and against the building of small nuclear power stations. Factors such as specific investment costs, opportunities for and areas of application, geographical conditions as well as those relating to infrastructure, security and availability play an important role in the planning, construction and running of a nuclear power station. For the usual large power stations, the comparatively low specific investment costs and a proven technology are favorable factors which minimize the investment risk. The article presents an overview of reasons for using small power stations and also considers the difficulties which would arise in practice. (orig.) [de

  6. Work place regulations - effects on power station construction

    International Nuclear Information System (INIS)

    Richter, E.

    1979-01-01

    The paper describes that the Workplace Order and Workplace Regulations cannot be applied in every area of a conventional power station or the conventional sections of nuclear power stations. In any case extensive regulations already exist for the hot regions of nuclear power stations. A proposal is made as to which areas of power stations should be developed in accordance with the Workplace Order and the Workplace Regulations and which areas are not deemed to be 'Workplaces'. This is illustrated with the aid of typical examples. (orig.) [de

  7. Simulation of a pressurized-water nuclear power station

    International Nuclear Information System (INIS)

    Larminaux, Robert; Ourmann, Michel

    1978-01-01

    Faced with the large programme of fitting out PWR nuclear power stations, Electricite de France have undertaken a series of studies with a view to ensuring the best possible adaptation of the secondary part -particularly the feed water heating section- to the nuclear boiler. In order to undertake such studies it has been necessary to finalize simulation models of the entire power station. So as to verify the validity of the models, experiment-calculation comparisons were made during transient operating states recorded at the Ardennes power station as well as during starting up trials at the Tihange I power station [fr

  8. Modern power station practice incorporating modern power system practice

    CERN Document Server

    Reynolds, PM

    1992-01-01

    This volume contains two additional features which enhance the value of Modern Power Station Practice as a whole: a cumulative subject index and a detailed list of tables of contents for the entire work. The cumulative index provides access to the vast body of information presented in the set, and also indicates at a glance the breadth and depth of the treatment through the use of inclusive page ranges for major topics. In order to allow the reader the greatest flexibility in using the index there are many cross-references. The entries themselves are qualified by up to two descriptive subheadi

  9. The treatment of H.pylori infected adults and children in Volgograd: pharmaco-epidemilological investigation

    Directory of Open Access Journals (Sweden)

    Magnitskaya O.V.

    2014-03-01

    Full Text Available This article represents results of pharmacoepidemiological research of H.pylori eradication treatment of adults and children in Volgograd. The aim was to determine H. pylori pharmacotherapy stereotypes and compare with international experts' recommendations. Material and Methods. There were analyzed CRFs of 94 adults and 132 children with H.pylori associated diseases in Volgograd region. Results. There were identified mistakes of treatment regimes and eradication control principles. Conclusion. The treatment of H.pylori infected adults and children in Volgograd does not match to international experts' recommendations.

  10. Locating techniques for nuclear power stations

    International Nuclear Information System (INIS)

    Hayashi, Masao

    1983-01-01

    The basic thought in locating nuclear power stations is to examine carefully the suitability of sites and the safety of plants, and in the end, to perfect the safety of public. In Japan, effort is exerted to obtain the trust of local people by carrying out investigation, research and examination from respective standpoints of the government, institutes and industries. The author has engaged in the standardization of the investigation, test and analysis regarding the aseismatic capability of ground, the verifying project in Tadotsu of the coupled vibration of ground and structures, the evaluation of the performance of large vibration tables, the future concept of new locating procedure and so on in the last more than ten years. The technological classification of ground, the technological meaning of active faults, the procedure of the aseismatic design of plants, the difference of earthquake input force according to various locating methods, 12 rules regarding the attenuation of vibration of ground, and the concept of new locating method in the 21st century are explained. As the new locating techniques applicable to central Japan, diluvial ground location, floating location in tunnels, underground location, offshore location and so on must be promoted. (Kako, I.)

  11. 47 CFR 74.793 - Digital low power TV and TV translator station protection of broadcast stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.793 Digital low power TV and TV translator station protection of broadcast stations. (a) An application to construct a new digital low power...

  12. Human reliability analysis of Lingao Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Li; Huang Shudong; Yang Hong; He Aiwu; Huang Xiangrui; Zheng Tao; Su Shengbing; Xi Haiying

    2001-01-01

    The necessity of human reliability analysis (HRA) of Lingao Nuclear Power Station are analyzed, and the method and operation procedures of HRA is briefed. One of the human factors events (HFE) is analyzed in detail and some questions of HRA are discussed. The authors present the analytical results of 61 HFEs, and make a brief introduction of HRA contribution to Lingao Nuclear Power Station

  13. Reload shutdown for Nuclear Power Stations in spain in 2003

    International Nuclear Information System (INIS)

    2004-01-01

    Regarding time reductions in fuel reloading at Spanish nuclear power stations, the Spanish Nuclear Security Council (CSN), at the request of the Spanish Finance and Treasury Department of the Chamber of Deputies, delivered an instruction, by which power station's owners were urged to establish a detailed planning of reload operations. This article includes the results of this instruction. (Author) 6 refs

  14. Emergency protection and nuclear power station remote monitoring

    International Nuclear Information System (INIS)

    Nowak, K.; Wolf, H.

    1986-01-01

    The States of the Federal Republic of Germany are planning emergency protection measures for the environment of nuclear power stations based on their statutory duty of care. In this connection the paper explains to what extent remote monitoring of nuclear power stations practised by the Federal Supervisory Authorities may support the design and implementation of emergency protection measures. (orig.) [de

  15. Ash Deposition Trials at Three Power Stations in Denmark

    DEFF Research Database (Denmark)

    Laursen, Karin; Frandsen, Flemming; Larsen, Ole Hede

    1998-01-01

    Six full-scale trials were conducted at three power stations in Denmark: Ensted, Funen, and Vendsyssel power stations. During these trials, pulverized coal, bottom ash, fly ash, and deposits from cooled probes were sampled and analyzed with various techniques. On the basis of SEM analyses...

  16. A Declining Region: Provincial Renaissance Revisited (Case of Volgograd Region

    Directory of Open Access Journals (Sweden)

    Drozdova Yuliya

    2014-12-01

    Full Text Available The paper analyzes findings yielded by the empirical study performed in the framework of an RGNF grant entitled “Image of a region as a communicative strategy for the authorities and mass media”. The methods of study included expert survey and formal survey (N=1000, July-September 2013, studying the opinion of respondents who were either internal experts residing in the Volgograd region (N=20; May-September 2013 or external experts who reside outside the region but maintain stable ties with the representatives of state and municipal authorities, regional mass media and business. The findings indicate that the Volgograd region has fallen behind other modernized Russian regions, that young people tend to leave it, that a negative image of the region as a declining territory persists. Answers to the open question “What is unacceptable for you in the existing image of the Volgograd region?” revealed major problems determining the local context of a declining region, and those were issues associated with inefficient regional/municipal administration: “the condition of the roads”, “constant replacement of people in the administration”, “politics as a whole”, “a destitute region without a good manager”, “unemployment”, “countryside is dying off”, “indifference of the authorities”, “roads, housing and public utilities and the administration”, “the authorities are not responsible for the people”, “the authorities do not solve the problems of the city or its people”, “thieving”, “dishonest authorities”, “the region goes to rack and ruin, no kindergartens or jobs”, “one cannot even walk in the streets”, “corruption”, “a stagnant region with low pay”, “no perspectives in the future”, “the region is stagnating due to corruption among officials”. According to the local Census Bureau, the Volgograd region can be classified as a declining territory where the population decline

  17. The economic consequences of the Sizewell 'B' nuclear power station

    International Nuclear Information System (INIS)

    Fothergill, S.; Gudgin, G.; Mason, N.

    1983-01-01

    The subject is covered in chapters, entitled: introduction (the background to Sizewell 'B'); policy options (Sizewell 'B'; a new coal-fired station; the no-new-station option; a PWR programme); economic framework (direct effects; financing; final macroeconomic effects); the construction phase (capital costs; direct effects; final effects; summary); the operating phase (a new power station as a replacement for older stations; the period of base-load operation; the later years of operation; summary); conclusions and policy recommendations. The first recommendation is that if a new power station is built it should be a coal-fired station rather than a PWR. The second recommendation is that if a new coal station is built there is a case for building it early, ahead of demand. (U.K.)

  18. Shippingport Atomic Power Station. Quarterly operating report, third quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    Jones, T. D.

    1978-01-01

    A loss of ac power to the station occurred on July 28, 1978 caused by an interaction between Beaver Valley Power Station and Shippingport Atomic Power Station when the main transformer of Unit No. 1 of the Beaver Valley Power Station developed an internal failure and tripped the BVPS. Two environmental studies were continued this quarter. The first involves reduction of main unit condenser chlorination and the second, river intake screen fish impingement sampling. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. During the third quarter of 1978, 874 cubic feet of radioactive solid waste was shipped out of state for burial. At the end of the quarter, the Fall shutdown continued with the plant heated up, the main turbine on turning gear and plant testing in progress prior to Station startup.

  19. Environmental radiation monitoring system in nuclear power station

    International Nuclear Information System (INIS)

    Matsuoka, Sadazumi; Tadachi, Katsuo; Endo, Mamoru; Yuya, Hiroshi

    1983-01-01

    At the time of the construction of nuclear power stations, prior to their start of operation, the state of environmental radiation must be grasped. After the start of the power stations, based on those data, the system of environmental radiation monitoring is established. Along with the construction of Kashiwazaki-Kariwa Nuclear Power Station, The Tokyo Electric Power Co., Inc. jointly with Fujitsu Ltd. has developed a high-reliability, environmental radiation monitoring system, and adopted ''optical data highways'' using optical fiber cables for communication. It consists of a central monitoring station and 11 telemeter observation points, for collecting both radiation and meteorological data. The data sent to the central station through the highways are then outputted on a monitoring panel. They are analyzed with a central processor, and the results are printed out. (Mori, K.)

  20. Review of radioactive discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report is a review of the arisings and concludes that suitable technologies exist, which if applied, could reduce discharges from nuclear power plants in England and Wales in line with the rest of Europe. (author)

  1. Principle simulator for a PWR nuclear power station

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1975-05-01

    A report is given on a simulator developed for the training of operational and planning staff for the Lovisa nuclear power station in Finland. All main components of the power station are illustrated and trainees can operate the simulator in the power range 3-100 %. The model was originally developed for planning the control system of Lovisa I, for which reason the simulator project could be carried out on a relatively limited budget. (author)

  2. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  3. Load control on nuclear power station

    International Nuclear Information System (INIS)

    Hattori, Takuya; Tsukuda, Yoshiaki.

    1988-01-01

    Power generation control is required for the nuclear power plants to meet electric power demand. In BWRs, power generation control can be achieved by arranging the coolant flow rate and control rod operation. In PWRs, power generation can be regulated by the control rods automatically controled with the steam valves. As a result of the experiments, it is confirmed that the operational function is normal, and safety of reactor components, pressure vessel and fuel elments are assured. (Katagiri, S)

  4. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  5. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  6. Power station impacts: socio-economic impact assessment

    International Nuclear Information System (INIS)

    Glasson, John; Elson, Martin; Barrett, Brendan; Wee, D. Van der

    1987-01-01

    The aim of this study is to assess the local social and economic impacts of a proposed nuclear power station development at Hinkley Point in Somerset. The proposed development, Hinkley Point C, would be an addition to the existing Hinkley Point A Magnox station, commissioned in 1965, and the Hinkley Point B Advanced Gas Cooled Reactor (AGR) station, commissioned in 1976. It is hoped that the study will be of assistance to the CEGB, the Somerset County and District Councils and other agencies in their studies of the proposed development. In addition, the study seeks to apply and further develop the methodology and results from previous studies by the Power Station Impacts (PSI) team for predicting the social and economic effects of proposed power station developments on their localities. (author)

  7. Prospect and problems of gas based power stations of NTPC

    International Nuclear Information System (INIS)

    Suryanarayana, A.

    1993-01-01

    The policy of the Government of India concerning utilisation of natural gas resources of the country has undergone changes over the last few years. The government decided in 1985 to allocate natural gas for power generation and in the year 1986 approved the setting up of the first series of three gas based combined cycle power projects of National Thermal Power Corporation (NTPC). The problems of gas power stations of NTPC are discussed. These are high cost of generation, completion of transmission line works to match with the commissioning of gas power stations, high price of natural gas, and fixation of tariff for sale of power from gas based power stations. (N.B.)

  8. Electrical power systems for Space Station

    Science.gov (United States)

    Simon, W. E.

    1984-01-01

    Major challenges in power system development are described. Evolutionary growth, operational lifetime, and other design requirements are discussed. A pictorial view of weight-optimized power system applications shows which systems are best for missions of various lengths and required power level. Following definition of the major elements of the electrical power system, an overview of element options and a brief technology assessment are presented. Selected trade-study results show end-to-end system efficiencies, required photovoltaic power capability as a function of energy storage system efficiency, and comparisons with other systems such as a solar dynamic power system.

  9. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Henderson, B.

    1982-11-01

    Architectural concepts and design proposals associated with the proposed Sizewell B power station are outlined. The figures are in a separate volume. They consist of the site layout plan, an axonometric drawing of the site, an elevations drawing and a colour perspective drawing of 'A', 'B' and 'C' stations. (U.K.)

  10. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McInerny, P.T.

    1982-11-01

    A description is given of the policy and practices that would be adopted in the commissioning, operation and maintenance of the proposed Sizewell B PWR power station. The system of personnel recruitment and training required to staff the station is discussed. (U.K.)

  11. 76 FR 50274 - Terrestrial Environmental Studies for Nuclear Power Stations

    Science.gov (United States)

    2011-08-12

    ... Draft Regulatory Guides in the ``Regulatory Guides'' collection of the NRC's Library at http://www.nrc... Stations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment... draft regulatory guide (DG), DG-4016, ``Terrestrial Environmental Studies for Nuclear Power Stations...

  12. Bidding Strategy of Virtual Power Plant with Energy Storage Power Station and Photovoltaic and Wind Power

    Directory of Open Access Journals (Sweden)

    Zhongfu Tan

    2018-01-01

    Full Text Available For the virtual power plants containing energy storage power stations and photovoltaic and wind power, the output of PV and wind power is uncertain and virtual power plants must consider this uncertainty when they participate in the auction in the electricity market. In this context, this paper studies the bidding strategy of the virtual power plant with photovoltaic and wind power. Assuming that the upper and lower limits of the combined output of photovoltaic and wind power are stochastically variable, the fluctuation range of the day-ahead energy market and capacity price is stochastically variable. If the capacity of the storage station is large enough to stabilize the fluctuation of the output of the wind and photovoltaic power, virtual power plants can participate in the electricity market bidding. This paper constructs a robust optimization model of virtual power plant bidding strategy in the electricity market, which considers the cost of charge and discharge of energy storage power station and transmission congestion. The model proposed in this paper is solved by CPLEX; the example results show that the model is reasonable and the method is valid.

  13. Why do we build nuclear power stations

    International Nuclear Information System (INIS)

    Keppler, E.

    1984-01-01

    The author discusses some aspects of interest in the context of opposition to nuclear power in Switzerland. The part played and to be played by nuclear power in Switzerland is discussed, criticisms and objections are countered, the implications of power generation without further nuclear contribution are examined, and requests in certain quarters for a tax on power generation except from alternative sources are rejected. (P.G.R.)

  14. Evolutionary growth for Space Station Freedom electrical power system

    Science.gov (United States)

    Marshall, Matthew Fisk; Mclallin, Kerry; Zernic, Mike

    1989-01-01

    Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

  15. Radiation protection organization in Guangdong Nuclear Power Station (GNPS)

    International Nuclear Information System (INIS)

    Yang Maochun

    1993-01-01

    The French way of radiation protection management has been adopted by Guangdong Nuclear Power Station (GNPS) but there are some differences. In this paper author describes radiation protection organization in GNPS, special measures having been taken and the present status

  16. Safety and exportation of nuclear power stations

    International Nuclear Information System (INIS)

    Coudray, M.; Perrais, J.P.

    1976-01-01

    Safety problems arising from exportation are especially handled through the French exportation of PWR stations. Regulations differ widely from one country to another. However, very large use of American regulations is made and frequently there is a tendency to harden such or such clause in the quotation. Industry must be ready to give satisfaction to such demands of customers. Sometimes also, it is a mere duplication of French stations which is above all looked for. In that case, it is the problem of using French regulations abroad which arises. Desirable changes in examination proceedings are analyzed together with a French regulation effort aiming to make easier the promotion of their use abroad. Finally, safety may be a factor of success for exportation attempts. It is shown how useless some outbiddings may be, but also how, on the contrary, speeding up of research and development effort towards specific safety problems in case of exportation, is to be promoted [fr

  17. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  18. Safety principles and design criteria for nuclear power stations

    International Nuclear Information System (INIS)

    Gazit, M.

    1982-01-01

    The criteria and safety principles for the design of nuclear power stations are presented from the viewpoint of a nuclear engineer. The design, construction and operation of nuclear power stations should be carried out according to these criteria and safety principles to ensure, to a reasonable degree, that the likelihood of release of radioactivity as a result of component failure or human error should be minimized. (author)

  19. Electric machinery and drives in thermal power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery. (TK) [de

  20. The plant efficiency of fusion power stations

    International Nuclear Information System (INIS)

    Darvas, J.; Foerster, S.

    1976-01-01

    Due to the circulating energy, lower efficiencies are to be expected with fusion power plants than with nuclear fission power plants. According to the systems analysis, the mirror machine is not very promising as a power plant. The plant efficiency of the laser fusion strongly depends on the laser efficiency about which one can only make speculative statements at present. The Tokamak requires a relatively low circulating energy and is certainly able to compete regarding efficiency as long as the consumption time can be kept large (> 100 sec) and the dead time between the power pulses small ( [de

  1. Design of photovoltaic central power station concentrator array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  2. Planning and preparedness for radiological emergencies at nuclear power stations

    International Nuclear Information System (INIS)

    Thomson, R.; Muzzarelli, J.

    1996-01-01

    The Radiological Emergency Preparedness (REP) Program was created after the March 1979 accident at the Three Mile Island nuclear power station. The Federal Emergency Management Agency (FEMA) assists state and local governments in reviewing and evaluating state and local REP plans and preparedness for accidents at nuclear power plants, in partnership with the US Nuclear Regulatory Commission (NRC), which evaluates safety and emergency preparedness at the power stations themselves. Argonne National Laboratory provides support and technical assistance to FEMA in evaluating nuclear power plant emergency response exercises, radiological emergency plans, and preparedness

  3. Simulation of the energy - environment economic system power generation costs in power-stations

    International Nuclear Information System (INIS)

    Weible, H.

    1978-09-01

    The costs of power generation are an important point in the electricity industry. The present report tries to supply a model representation for these problems. The costs of power generation for base load, average and peak load power stations are examined on the basis of fossil energy sources, nuclear power and water power. The methods of calculation where dynamic investment calculation processes are used, are given in the shape of formulae. From the point of view of long term prediction, power generation cost sensitivity studies are added to the technical, economic and energy-political uncertainties. The sensitivity of models for calculations is examined by deterministic and stochastic processes. In the base load and average region, power generation based on nuclear power and water power is economically more favourable than that from fossilfired power stations. Even including subsidies, this cost advantage is not in doubt. In the peak load region, pumped storage power stations are more economic than fossilfired power stations. (orig.) [de

  4. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  5. Nuclear power stations. Information paper no. 1. Controls on the building and running of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    Controls and constraints which govern the development and running of nuclear power stations are briefly examined. Government policy, permission to build, authority to start building, site acquisition building, running and public opinion are briefly discussed.

  6. Sizewell 'B' power station - engineering and construction

    International Nuclear Information System (INIS)

    Walker, A.

    1989-01-01

    The Sizewell 'B' design is based on the Callaway PWR station in Missouri, USA. There have been many papers describing the additional criteria covering safety, operational experience and design and manufacturing practices which were applied to the Callaway reference design and which led to the Sizewell 'B' design concept. This paper describes the implementation of some of these design criteria leading to the layout related design features. Comparisons are drawn with the reference design. This paper concludes by describing various aspects of the design and construction process and the progress which has been made on the Sizewell site. (author)

  7. Hinkley Point 'C' power station public inquiry: statement of case

    International Nuclear Information System (INIS)

    1988-08-01

    This Statement of Case contains full particulars of the case which the Central Electricity Generating Board (CEGB) proposes to put forward at the Hinkley Point ''C'' Inquiry. It relates to the planning application made by the CEGB for the construction of a 1200 MW Pressurized Water Reactor (PWR) power station at Hinkley Point in the United Kingdom, adjacent to an existing nuclear power station. The inquiry will consider economic, safety, environmental and planning matters relevant to the application and the implications for agriculture and local amenities of re-aligning two power transmission lines. The Statement contains submissions on the following matters: Topic 1 The Requirement for the Station; Topic 2 Safety and Design, including Radioactive Discharges; Topic 3 The On-Site Management of Radioactive Waste and Decommissioning of the Station; Topic 4 Emergency Arrangements; Topic 5 Local and Environmental Issues. (author)

  8. Station black out of Fukushima Daiichi Nuclear Power Station Unit 1 was not caused by tsunamis

    International Nuclear Information System (INIS)

    Ito, Yoshinori

    2013-01-01

    Station black out (SBO) of Fukushima Daiichi Nuclear Power Station Unit 1 would be concluded to be caused before 15:37 on March 11, 2011 because losses of emergency ac power A system was in 15:36 and ac losses of B system in 15:37 according to the data published by Tokyo Electric Power Co. (TEPCO) in May 10, 2013. Tsunami attacked the site of Fukushima Daiichi Nuclear Power Station passed through the position of wave amplitude meter installed at 1.5 km off the coast after 15:35 and it was also recognized tsunami arrived at the coast of Unit 4 sea side area around in 15:37 judging from a series of photographs taken from the south side of the site and general knowledge of wave propagation. From a series of photographs and witness testimony, tsunami didn't attack Fukushima Daiichi Nuclear Power Station uniformly and tsunami's arrival time at the site of Unit 1 would be far later than arrival time at the coast of Unit 4 sea side area, which suggested it would be around in 15:39. TEPCO insisted tsunami passed through 1.5 km off the coast around in 15:33 and clock of wave amplitude meter was incorrect, which might be wrong. Thus SBO of Fukushima Daiichi Nuclear Power Station Unit 1 occurred before tsunami's arrival at the site of Unit 1 and was not caused by tsunami. (T. Tanaka)

  9. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  10. case study of afam power station

    African Journals Online (AJOL)

    NIJOTECH

    documentation system, increased training programme for local manpower, privatization of the electric power ... transmission voltage level ad year of installation. b) .... This has led to a drop in the ... and distribution of electrical Energy Houdder.

  11. Trends of chemical monitoring in power stations

    International Nuclear Information System (INIS)

    Winkler, R.; Venz, H.

    1983-01-01

    Frequently, the state-of-the-art of chemical monitoring in power plants is still determined by conservative methods. A thorough rationalization requires not only modern analytical procedures, but also the consideration of chemically affected processes in complex process analyses and the combination of automatic analyzers with available process computers. Using some examples, ways of reducing monitoring efforts without impairing safety and economy of nuclear power plant operation are pointed out. (author)

  12. Core power distribution measurement and data processing in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Hong

    1997-01-01

    For the first time in China, Daya Bay Nuclear Power Station applied the advanced technology of worldwide commercial pressurized reactors to the in-core detectors, the leading excore six-chamber instrumentation for precise axial power distribution, and the related data processing. Described in this article are the neutron flux measurement in Daya Bay Nuclear Power Station, and the detailed data processing

  13. Feasibility study on floating nuclear power station

    International Nuclear Information System (INIS)

    Kajima, Ryoichi

    1987-01-01

    It is stipulated that nuclear power plants are to be built on solid rock bases on land in Japan. However, there are a limited number of appropriate siting grounds. The Central Research Institute of Electric Power Industry has engaged since 1981 in the studies on the construction technology of power plants, aiming at establishing new siting technology to expand the possible siting areas for nuclear power plants. Underground siting is regarded as a proven technology due to the experience in underground hydroelectric power plants. The technology of siting on quaternary ground is now at the stage of verification. In this report, the outline of floating type offshore/inshore siting technology is introduced, which is considered to be feasible in view of the technical and economical aspects. Three fixed structure types were selected, of which the foundations are fixed to seabed, plant superstructures are above sea surface, and which are floating type. Aiming at ensuring the aseismatic stability of the plant foundations, the construction technology is studied, and the structural concept omitting buoyancy is possible. The most practical water depth is not more than 20 m. The overall plant design, earthquake isolation effect and breakwater are described. (Kako, I.)

  14. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  15. Environmental impact of nuclear power stations

    International Nuclear Information System (INIS)

    Kellermann, O.; Balfanz, H.P.

    1975-01-01

    Following a comparative consideration of the present and future environmental impact by coal, oil, and nuclear power plants, the special risks connected with the use of the latter are dealt with. A distinction is made in considering the risk between public exposure, in the environment of a plant due to operational leakage and radiation exposure in the plant under normal operation and in the case of an accident. The accident risk consideration is the basis of the Rasmussen study where the different containment construction of german plants as well as the higher population density for sites in the FRG are considered. Evaluation parameters are given to quantify the risks and using this, the risks of various cases of impact of nuclear power plants are compared. The comparison shows that the risks of nuclear power plant operation according to the value in normal operation are comparable to those in the case of an accident. (ORU/LH) [de

  16. Tarapur Atomic Power Station - - an overview of experience

    International Nuclear Information System (INIS)

    Shah, J.C.

    1979-01-01

    A broad overview of the experience and performance of the Tarapur Atomic Power Station (TAPS) in its role as the developing world's first foray in commercial atomic power has been attempted. The prime objective was not just generation of power but assimilation of an advanced technology on an economically viable basis in the underdeveloped environment compounded with governmental organisational culture. Scientific and technical advances registered through the TAPS experience in the area of design, operation and maintenance are mentioned. Aspects of station performance, management and even economics are also covered. (auth.)

  17. Environmental implications of fossil-fuelled power stations

    International Nuclear Information System (INIS)

    Robson, A.

    1979-01-01

    The public health and environmental implications of electricity generation by fossil-fuelled power stations are discussed with respect to pollutant emission and the disposal of waste products. The following conclusions were deduced. The policy of using tall chimney stacks has ensured that acceptable concentrations of potential pollutants are observed in the vicinity of power stations. Large scale carbon dioxide emission may represent a problem in the future due to its effect on the climate. The effects of sulphur dioxide and the oxides of nitrogen need to be kept under review but it is likely that sources other than power stations will be of greater importance in this context. Pulverised fuel ash is a safe and useful by product of power production. Finally the radiation dose to man caused by the release of naturally occurring radioisotopes is negligible compared to the natural background levels. (UK)

  18. Nuclear power stations and their environmental hazards

    International Nuclear Information System (INIS)

    Jansen, P.

    1975-01-01

    Starting from a consideration of the energy demand up to the year 2000, the author points out the necessity of nuclear power plant operation for electricity generation and discusses the possible danger to human populations. An assessment of the emission rate of radionuclides in nuclear power plant operation and the possible health hazards to the total population is based on a survey of the U.S. EPA of February 1972. The discussion of the accident risk is based on the results of Rasmussen's study of reactor safety. (ORU/AK) [de

  19. Physics Experiments at the Agesta Power Station

    International Nuclear Information System (INIS)

    Apelqvist, G.; Bliselius, P. Aa.; Blomberg, P.E.; Jonsson, E.; Aakerhielm, F.

    1966-09-01

    Part A. Dynamic measurements have been performed at the Aagesta reactor at power levels from 0.3 to 65 MW(th). The purposes of the experiments have been both to develop experimental methods and equipment for the dynamic studies and to measure the dynamic characteristics of the reactor in order to check the dynamic model. The experiments have been performed with four different perturbation functions: trapezoidal and step functions and two types of periodic multifrequency signals. Perturbations were introduced in the reactivity and in the load. The recordings were made of the responses of nuclear power, coolant inlet and outlet temperature and control rod position. The results are presented as step responses and transfer functions (Bode diagrams). Inmost cases the relative accuracy is ± 0.5 dB in amplitude and ± 5 deg in phase. The results from the experiments in general show rather good agreement with the results obtained from a dynamic model, which successively has been improved. Experience on reactor noise analysis based on measurements in the Agesta power reactor is discussed. It is shown that the noise measurements have given complementary dynamic information of the reactor. Part B. Static measurements of the physics parameters in the Agesta reactor are carried out to confirm theoretical methods for reactor calculations and to form a good basis for safe operation of the reactor. The reactivity worth of groups of control rods are determined with different methods and compared with calculations with the three-dimensional code HETERO. The excess reactivity as a function of burn up is obtained from the control rod positions. The temperature coefficient of the moderator is measured by lowering the moderator temperature at constant power and observing the change in control rod insertion. As burn up increases the experiments are repeated in order to follow the changes in the coefficient. The xenon poisoning effects are measured by changing the power level and

  20. Physics Experiments at the Agesta Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Apelqvist, G [State Power Board, Stockholm (Sweden); Bliselius, P Aa; Blomberg, P E; Jonsson, E; Aakerhielm, F [AB Atomenergi, Nykoeping (Sweden)

    1966-09-15

    Part A. Dynamic measurements have been performed at the Aagesta reactor at power levels from 0.3 to 65 MW(th). The purposes of the experiments have been both to develop experimental methods and equipment for the dynamic studies and to measure the dynamic characteristics of the reactor in order to check the dynamic model. The experiments have been performed with four different perturbation functions: trapezoidal and step functions and two types of periodic multifrequency signals. Perturbations were introduced in the reactivity and in the load. The recordings were made of the responses of nuclear power, coolant inlet and outlet temperature and control rod position. The results are presented as step responses and transfer functions (Bode diagrams). Inmost cases the relative accuracy is {+-} 0.5 dB in amplitude and {+-} 5 deg in phase. The results from the experiments in general show rather good agreement with the results obtained from a dynamic model, which successively has been improved. Experience on reactor noise analysis based on measurements in the Agesta power reactor is discussed. It is shown that the noise measurements have given complementary dynamic information of the reactor. Part B. Static measurements of the physics parameters in the Agesta reactor are carried out to confirm theoretical methods for reactor calculations and to form a good basis for safe operation of the reactor. The reactivity worth of groups of control rods are determined with different methods and compared with calculations with the three-dimensional code HETERO. The excess reactivity as a function of burn up is obtained from the control rod positions. The temperature coefficient of the moderator is measured by lowering the moderator temperature at constant power and observing the change in control rod insertion. As burn up increases the experiments are repeated in order to follow the changes in the coefficient. The xenon poisoning effects are measured by changing the power level and

  1. Physical decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy (USDOE), and the turbine-generator and balance of plant which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by USDOE from the Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being managed for the USDOE by the General Electric Company and its integated subcontractor, Morrison Knudsen-Ferguson (MK-F) Company. The objectives of the Shippingport Station Decommissioning Project (SSDP) are to: Demonstrate the safe and cost effective dismantlement of a large scale nuclear power plant; Provide useful data for future decommissioning projects

  2. The Creys-Malville Power Station

    International Nuclear Information System (INIS)

    Saitcevsky, B.; Broggiato, A.; Eitz, A.

    1984-01-01

    The Super Phenix 1, a fast neutron reactor of large power, which is under construction as the result of a European Cooperation at the Creys-Malville (Isere) site, enters its last building phase for commissioning in 1984. The main characteristics of the power plant, as also its site are presented. The nuclear boiler is described, and the studies carried on this boiler are briefly given. Then, an outline of the construction and of the installation of the boiler is given. Finally, after a summary of the stages and the lessons learned from the installation, the arrangements made for ensuring the training and the allocation of the operational team which will take over the plant progressively with the help of the tests, are described [fr

  3. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1982-11-01

    The procedure for decommissioning a CEGB nuclear power station is described. Regulatory and licensing procedures in the UK are first listed. The principal sources of radioactivity in the station after final shutdown are classified. The three stages of the decommissioning procedure are then described. Finally the following topics are dealt with briefly: the management of decommissioning wastes, radiological protection during the operation, possible faults arising having radiological significance, design for decommissioning and costs. (U.K.)

  4. The closed-down nuclear power station

    International Nuclear Information System (INIS)

    Kutscheidt, E.

    1987-01-01

    The author deals with the decision of the Higher Administrative Court of Koblenz of October 6, 1986, in which the immediate execution of the operation licence for the nuclear power plant at Muelheim-Kaerlich is suspended. In his opinion the reasons for the judgement are controversial. But the decision is not subject to appeal, because in this case the Higher Administrative Court is the court of first and last instance. (WG) [de

  5. Nuclear power station - a living organism

    International Nuclear Information System (INIS)

    Stedry, B.

    1993-01-01

    The ABB-ZPA present here a very clear electronic scheme of the well know type I n =I cosφ (not the whole U.Icosφ product) in the typical modular design and respecting every demand. Very peculiar tests on running-down reactor and his power scheme proved that the simplified I.cosφ measuring was giving on the big asynchron motors practically the same decisions as the original mechanical induction relay. 2 figs

  6. Improvements in operational safety performance of the Magnox power stations

    Energy Technology Data Exchange (ETDEWEB)

    Marchese, C.J. [BNFL Magnox Generation, Berkeley (United Kingdom)

    2000-10-01

    In the 43 years since commencement of operation of Calder Hall, the first Magnox power station, there remain eight Magnox stations and 20 reactors still in operation, owned by BNFL Magnox Generation. This paper describes how the operational safety performance of these stations has significantly improved over the last ten years. This has been achieved against a background of commercial competition introduced by privatization and despite the fact that the Magnox base design belongs to the past. Finally, the company's future plans for continued improvements in operational safety performance are discussed. (author)

  7. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  8. ANALYSIS OF SOLAR POWER STATION SCHEMES ON PHOTOELECTRIC MODULES FOR ELECTRIC CARS CHARGING STATIONS

    Directory of Open Access Journals (Sweden)

    A. Hnatov

    2017-12-01

    Full Text Available The analysis of existing schemes for building solar power stations on photoelectric modules with the revealing of their operation principles and functionality has been conducted. The specified technical characteristics of each of the analyzed schemes are given. The structural scheme of the solar charging station for electric cars with determining its functional capabilities and operation features is proposed. The practical application of this scheme will help to reduce the dependence on the general electric power supply network and will create conditions for its total rejection.

  9. Multivariable control in nuclear power stations

    International Nuclear Information System (INIS)

    Parent, M.; McMorran, P.D.

    1982-12-01

    Linear, state-space models of power plant systems tend to be of high order, leading to difficulties in the design of control systems by state-space methods. However, the control system has access only to the plant inputs and outputs, and the fast-responding internal variables may be masked by slower, dominant variables. Model order reduction applies modal analysis to eliminate the fast modes while retaining the character of the input-output response. Two alternative techniques are presented and demonstrated on a model of a nuclear steam generator. The preferred method is implemented in MVPACK, the computer-aided design package

  10. Complex Mobile Independent Power Station for Urban Areas

    Science.gov (United States)

    Tunik, A. A.; Tolstoy, M. Y.

    2017-11-01

    A new type of a complex mobile independent power station developed in the Department of Engineering Communications and Life-Support Systems of Irkutsk National Research Technical University, is presented in this article. This station contains only solar panel, wind turbine, accumulator, diesel generator and microbial fuel cell for to produce electric energy, heat pump and solar collector to generate heat energy and also wastewater treatment plant and new complex control system. The complex mobile independent power station is intended for full power supply of a different kind of consumers located even in remote areas thus reducing their dependence from centralized energy supply systems, decrease the fossil fuel consumption, improve the environment of urban areas and solve the problems of the purification of industrial and municipal wastewater.

  11. On the troubles happened in nuclear power stations, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The troubles which happened at the nuclear power stations of Japan in the fiscal year of 1995 are described in this report. The number of troubles in those power stations reported from the corporations of electric industry to Nuclear Safety Commission according to The Law for Regulation of Nuclear Fertile Material, Nuclear Fuel Material and Reactors and Utility Industry Law were 14 in the year and so, the number per reactor was 0.3. The details of the trouble cases were as follows; one and nine cases for automatic and manual shutdowns in operation, respectively and 4 cases found during a down-time of the reactor. But, there was no influence on the environment surrounding those nuclear power stations by the radioactive materials in either of the cases. (M.N.)

  12. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  13. Remerschen nuclear power station with BBR pressurized water reactor

    International Nuclear Information System (INIS)

    Hoffmann, J.P.

    1975-01-01

    On the basis of many decades of successful cooperation in the electricity supply sector with the German RWE utility, the Grand Duchy of Luxemburg and RWE jointly founded Societe Luxembourgeoise d'Energie Nucleaire S.A. (SENU) in 1974 in which each of the partners holds a fifty percent interest. SENU is responsible for planning, building and operating this nuclear power station. Following an international invitation for bids on the delivery and turnkey construction of a nuclear power station, the consortium of the German companies of Brown, Boveri and Cie. AG (BBC), Babcock - Brown Boveri Reaktor GmbH (BBR) and Hochtief AG (HT) received a letter of intent for the purchase of a 1,300 MW nuclear power station equipped with a pressurized water reactor. The 1,300 MW station of Remerschen will be largely identical with the Muelheim-Kaerlich plant under construction by the same consortium near Coblence on the River Rhine since early 1975. According to present scheduling, the Remerschen nuclear power station could start operation in 1981. (orig.) [de

  14. Proceedings of scientific-technical seminar: materials investigation for power stations and power grid

    International Nuclear Information System (INIS)

    1994-05-01

    This report is an assembly of the papers concerning the material problems occurring during the exploitation of power stations as well as power grid. The diagnostic methods are also discussed. (author)

  15. Use of expansion joints in power stations

    International Nuclear Information System (INIS)

    Birker; Rommerswinkel.

    1976-01-01

    The paper discusses the mode of action of different systems of expansion joints. Special regard is given to the problems of expansion of pipelines of high rated diameter as employed in today's large power plant turbines. Due to the limited space available, the important role of the spring rate of the bellows for the reaction forces and moments acting on the connection points is pointed out. Apart from this details are given on the fabrication and materials selection of expansion joint bellows, and problems are discussed which arise in connection with the mechanical or hydraulic deformation of bellows with one or more walls. The non-destructive methods now in use for the testing of expansion pipe joints are mentioned along with experiments to test their behaviour under changing loads. The paper concludes on some remarks concerning proper transport, storage and installation of expansion pipe joints. (orig./AK) [de

  16. Thermal power stations and environmental protection

    International Nuclear Information System (INIS)

    Gerking, E.

    1975-01-01

    In this book, the advantages of an optimum cooling concept for waters are compared with the disadvantages of an uncontrolled thermal pollution of waters by waste waters from thermal power plants. The book focuses on the problem of the cost of measures for environmental protection which has not yet received a detailed and complete treatment. The author suggests that perfectionist solutions and superfluos measures be abandoned in favour of a far-reaching, efficient environmental protection concept with a low expenditure of fuel and capital. A detailed treatment is given to false conclusions in the present estimations of the effects of thermal pollution of the waters and to the advantages of freshwater cooling and cooling in general. Also discussed are immission problems and attempts at their solution. (ORU/AK) [de

  17. Environmental and Physiological Aspects of Adaptation of Foreign Students Studying in Russia (on the Example of the Volgograd Region

    Directory of Open Access Journals (Sweden)

    Sevryukova G.A.

    2015-12-01

    Full Text Available One of the most powerful factors of environment that has impact on human body, is low temperature. The degree of its influence depends on the area, containment of the cooling surface of the body, the duration and power of exposure, as well as a number of related factors (humidity of atmospheric air, speed of movement. The ability of thermoregulation in humans provides a constant temperature of the body within certain limits of temperature fluctuations of the environment. These fluctuations are not the same for different people. An important role is played by the individual endurance to cold at the same ambient temperature. The ability to maintain homeostatic temperature balance in the system “organism-environment” is one of the most important features of a living system. The article considers the specifics of adaptation of students from warm countries to the climatic conditions of the Volgograd region. The authors describe the climatic characteristics of the Volgograd region. The weather in winter is characterized by the cyclones, which cause heavy snowfalls, blizzards, strong winds up to 13-18 m/s, temperature decrease (to – 28°С.The article presents the results of the evaluation of the average temperature of the body, the parameters of physical development, data cold test. Increasing the average body temperature after the winter period shows the developing process of adapting the body of international students. At the same time the negative reaction to the cold test was revealed with greater manifestations of students from Turkmenistan. It indicates the presence of adverse reactions and the formation of the difficulties of adaptation processes.

  18. Daya Bay Nuclear Power Station equipment reliability management system innovation

    International Nuclear Information System (INIS)

    Gao Ligang; Wang Zongjun

    2006-01-01

    Daya Bay Nuclear Power Station has achieved good performance since its commercial operation in 1994. The equipment reliability management system that features Daya Bay characteristics has been established through constant technology introduction, digestion and innovation. It is also based on the success of operational system, equipment maintenance system and technical support system. The system lays a solid foundation for the long-term safe operation of power station. This article emphasizes on the innovation part of equipment reliability management system in Daya Bay. (authors)

  19. Natural radionuclides near a coal-fired power station

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Briggs, J L

    1984-06-15

    An experiment was carried out to measure the specific activity of Pb-210 and Po-210 in livers from cattle that had grazed in a field near Didcot coal-fired power station. Livers from cattle in the Cotswold region were measured for comparison. The specific activities of Pb-210 and Po-210 in soil and grass samples from both areas were also measured at 3-monthly intervals over a year. No statistically significant increases were observed in the Pb-210 and Po-210 levels in liver, soil or grass samples which could be attributed to the operation of the power station.

  20. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  1. Design Provisions for Withstanding Station Blackout at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2015-08-01

    International operating experience has shown that the loss of off-site power supply concurrent with a turbine trip and unavailability of the standby alternating current power system is a credible event. Lessons learned from the past and recent station blackout events, as well as the analysis of the safety margins performed as part of the ‘stress tests’ conducted on European nuclear power plants in response to the Fukushima Daiichi accident, have identified the station blackout event as a limiting case for most nuclear power plants. The magnitude 9.0 earthquake and consequential tsunami which occurred in Fukushima, Japan, in March 2011, led to a common cause failure of on-site alternating current electrical power supply systems at the Fukushima Daiichi nuclear power plant as well as the off-site power grid. In addition, the resultant flooding caused the loss of direct current power supply, which further exacerbated an already critical situation at the plant. The loss of electrical power resulted in the meltdown of the core in three reactors on the site and severely restricted heat removal from the spent fuel pools for an extended period of time. The plant was left without essential instrumentation and controls, and this made accident management very challenging for the plant operators. The operators attempted to bring and maintain the reactors in a safe state without information on the vital plant parameters until the power supply was eventually restored after several days. Although the Fukushima Daiichi accident progressed well beyond the expected consequences of a station blackout, which is the complete loss of all alternating current power supplies, many of the lessons learned from the accident are valid. A failure of the plant power supply system such as the one that occurred at Fukushima Daiichi represents a design extension condition that requires management with predesigned contingency planning and operator training. The extended loss of all power at a

  2. Safety of CANDU nuclear power stations

    International Nuclear Information System (INIS)

    Snell, V.G.

    1978-11-01

    A nuclear plant contains a large amount of radioactive material which could be a potential threat to public health. The plant is therefore designed, built and operated so that the risk to the public is low. Careful design of the normal reactor systems is the first line of defense. These systems are highly resistant to an accident happening in the first place, and can also be effective in stopping it if it does happen. Independent and redundant safety sytems minimize the effects of an accident, or stop it completely. They include shutdown systems, emergency core cooling systems, and containment systems. Massive impairment of any one safety system together with an accident can be tolerated. This 'defence in depth' approach recognizes that men and machines are imperfect and that the unexpected happens. The nuclear power plant need not be perfect to be safe. To allow meaningful judgements we must know how safe the plant is. The Atomic Energy Control Board guidelines give one such measure, but they may overestimate the true risk. We interpret these guidelines as an upper limit to the total risk, and trace their evolution. (author)

  3. Solar Power Station Output Inverter Control Design

    Directory of Open Access Journals (Sweden)

    J. Bauer

    2011-04-01

    Full Text Available The photovoltaic applications spreads in these days fast, therefore they also undergo great development. Because the amount of the energy obtained from the panel depends on the surrounding conditions, as intensity of the sun exposure or the temperature of the solar array, the converter must be connected to the panel output. The Solar system equipped with inverter can supply small loads like notebooks, mobile chargers etc. in the places where the supplying network is not present. Or the system can be used as a generator and it shall deliver energy to the supply network. Each type of the application has different requirements on the converter and its control algorithm. But for all of them the one thing is common – the maximal efficiency. The paper focuses on design and simulation of the low power inverter that acts as output part of the whole converter. In the paper the design of the control algorithm of the inverter for both types of inverter application – for islanding mode and for operation on the supply grid – is discussed. Attention is also paid to the design of the output filter that should reduce negative side effects of the converter on the supply network.

  4. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  5. Bioremediation for coal-fired power stations using macroalgae.

    Science.gov (United States)

    Roberts, David A; Paul, Nicholas A; Bird, Michael I; de Nys, Rocky

    2015-04-15

    Macroalgae are a productive resource that can be cultured in metal-contaminated waste water for bioremediation but there have been no demonstrations of this biotechnology integrated with industry. Coal-fired power production is a water-limited industry that requires novel approaches to waste water treatment and recycling. In this study, a freshwater macroalga (genus Oedogonium) was cultivated in contaminated ash water amended with flue gas (containing 20% CO₂) at an Australian coal-fired power station. The continuous process of macroalgal growth and intracellular metal sequestration reduced the concentrations of all metals in the treated ash water. Predictive modelling shows that the power station could feasibly achieve zero discharge of most regulated metals (Al, As, Cd, Cr, Cu, Ni, and Zn) in waste water by using the ash water dam for bioremediation with algal cultivation ponds rather than storage of ash water. Slow pyrolysis of the cultivated algae immobilised the accumulated metals in a recalcitrant C-rich biochar. While the algal biochar had higher total metal concentrations than the algae feedstock, the biochar had very low concentrations of leachable metals and therefore has potential for use as an ameliorant for low-fertility soils. This study demonstrates a bioremediation technology at a large scale for a water-limited industry that could be implemented at new or existing power stations, or during the decommissioning of older power stations. Copyright © 2015 Elsevier Ltd. All rights reserved.

  6. Research on application of knowledge engineering to nuclear power stations

    International Nuclear Information System (INIS)

    Umeda, Takeo; Kiyohashi, Satoshi

    1990-01-01

    Recently, the research on the software and hardware regarding knowledge engineering has been advanced eagerly. Especially the applicability of expert systems is high. When expert systems are introduced into nuclear power stations, it is necessary to make the plan for introduction based on the detailed knowledge on the works in nuclear power stations, and to improve the system repeatedly by adopting the opinion and request of those in charge upon the trial use. Tohoku Electric Power Co. was able to develop the expert system of practically usable scale 'Supporting system for deciding fuel movement procedure'. The survey and analysis of the works in nuclear power stations, the selection of the system to be developed and so on are reported. In No. 1 plant of Onagawa Nuclear Power Station of BWR type, up to 1/3 of the fuel is replaced at the time of the regular inspection. Some fuel must be taken to outside for ensuring the working space. The works of deciding fuel movement procedure, the development of the system and its evaluation are described. (K.I.)

  7. Regional Community and International Relations: the Volgograd Region Experience

    Directory of Open Access Journals (Sweden)

    Danakari Richard A.

    2016-06-01

    Full Text Available The article deals with the complex and controversial problems of the new regional communities’ formation and the impact of the interethnic relations sphere on them. The author notes that the processes of interaction between representatives of different cultures and civilizations, ethnic groups and religions have become increasingly controversial and tense in the context of continuous social dynamics. Similarly to the Russian society as a whole, regional communities are in a state of transitivity. They get transformed, they acquire new qualities such as multicasting and heterogeneity, multi-ethnicity and multi-confessionalism, fragmentarity and multiculturality. This fact increases the risks and uncertainties, problematizes future prospects. National non-governmental organizations are increasingly positioning themselves as civil society institutions at the present stage of social development at the regional level. They perform a difficult dual task: on the one hand, they ensure the preservation and development of history, native language, culture, ethnic traditions, and on the other hand, they work on the integration, on the common identity and the Russian nation formation. On the territory of the Volgograd region, largely due to the active cooperation of regional authorities and local authorities with national public associations, international and inter-confessional relations are stable. The basis of such activity is respect for history, native language, culture, tradition, religion, national dignity of all people in the region, regardless of their belonging to a certain ethnic group or religion. Over two decades of accumulated considerable experience of joint inter-ethnic dialogue and cooperation, provided tolerance and peace, harmony and mutual understanding between people of different ethnicities and religions in the country.

  8. Nuclear power stations: environmental surveillance of radioactivity

    International Nuclear Information System (INIS)

    Pellerin, P.

    1972-01-01

    circumstances at a level which is perfectly compatible with public health regulations. Far from constituting a hazard to the public, nuclear facilities can, by virtue of the strictness of the controls to which they are subjected, serve as a model for combating numerous unacceptable conventional pollutants of the environment, the most alarming of which, indeed, nuclear power will undoubtedly cause to disappear in the long run

  9. Nuclear power stations in August: information and commentary

    International Nuclear Information System (INIS)

    Rogozhin, Yu.

    1989-01-01

    A summary of events at nuclear power stations in the USSR in August 1989 is given. There were 44 nuclear power units in service which had 9 unplanned shutdowns and 13 unsanctioned power reductions. Gosatomenergonadzor SSSR is also responsible for all research and marine reactors. It is reported that there are currently (1989) six nuclear vessels in the USSR and no major accidents or damage to nuclear steam-generating units on these were reported. On-site inspectors maintain a constant presence at nuclear power stations to supervise operation and make sure safety requirements are enforced. Glasnost is opening up previously forbidden areas to the public to enable it to obtain information to allow objective assessment to be made. (author)

  10. Improved monolithic reinforced concrete construction for nuclear power stations

    International Nuclear Information System (INIS)

    Guenther, P.; Fischer, K.

    1983-01-01

    Experience has shown that in applying monolithic reinforced concrete in nuclear power plant construction the following auxiliary means are useful: measuring sheets in assembling, welding gauges for reaching high tolerance accuracies of prefabricated reinforced concrete members, suitable lining materials, formwork anchorage and formwork release agents, concrete workability agents, mechanized procedures for finishing and assembling. These means were successfully tested in constructing the Greifswald nuclear power station

  11. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Youngman, P.

    1982-11-01

    The scenic effect of the proposed Sizewell B power station is considered. Offsite planting of trees, landscaping of the areas around the new access road and of the site itself are discussed. The landscape designs are in a separate volume. (U.K.)

  12. The glass model of Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Kuttruf, H.; Lemke, W.

    1986-01-01

    The glass model represents the nuclear steam generator system of Muelheim-Kaerlich nuclear power station on a scale of 1:25 and in simplified form, so that the thermohydraulic behaviour in both normal operational and fault conditions can be represented. A set-up time of about one hour results in a helpful aid to instruction. (orig.) [de

  13. Application of the minicomputer at Genkai Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Kitamura, H [Kyushu Electric Power Co., Inc., Fukuoka (Japan)

    1977-03-01

    Genkai Nuclear Power Station introduced a minicomputer system for the data control purpose in addition to a process control computer introduced in the same manner as other PWR nuclear power stations. This system employs two computers; the one for on-line data aquisition, and another for data processing. The control system introduced includes four systems amoung various data control businesses in the nuclear power station. The language used is mainly an assembler language. The first is the meteorological control system which collects, edits and transmits the weather data sent from the observation instruments around the power station. The second is the personal radiation exposure control system which is designed to realize the labor-saving in book-keeping, the speed-up and the improvement of accuracy in the preparation of the reports to the authorities and the head office and the data for exposure control, and the unification of data processing. The third is the waste control system composed of three subsystems of gas, liquid and solid waste control. The fourth is the maintenance and repair control system which gives inputs to the computer according to the classification written in the slips for maintenance and repair, and prepares a number of statistical tables for maintenance control.

  14. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Smedley, G.P.

    1982-11-01

    A description is given of the role of Lloyd's Register of Shipping as Independent Inspection Agency for the primary circuit of the PWR for the proposed Sizewell B power station. Topics discussed include: Lloyd's Register of Shipping and its functions; the Independent Inspection Agency and its functions; fabrication of the reactor pressure vessel; inspection on site at Sizewell. (U.K.)

  15. Incinerators for radioactive wastes in Japanese nuclear power stations

    International Nuclear Information System (INIS)

    Karita, Yoichi

    1983-01-01

    As the measures of treatment and disposal of radioactive wastes in nuclear power stations, the development of the techniques to decrease wastes, to reduce the volume of wastes, to treat wastes by solidification and to dispose wastes has been advanced energetically. In particular, efforts have been exerted on the volume reduction treatment from the viewpoint of the improvement of storage efficiency and the reduction of transport and disposal costs. Incineration as one of the volume reduction techniques has been regarded as the most effective method with large reduction ratio, but it was not included in waste treatment system. NGK Insulators Ltd. developed NGK type miscellaneous solid incinerators, and seven incinerators were installed in nuclear power stations. These incinerators have been operated smoothly, and the construction is in progress in six more plants. The necessity of incinerators in nuclear power stations and the problems in their adoption, the circumstance of the development of NGK type miscellaneous solid incinerators, the outline of the incinerator of Karlsruhe nuclear power station and the problems, the contents of the technical development in NGK, the outline of NGK type incinerators and the features, the outline of the pretreatment system, incinerator system, exhaust gas treatment system, ash taking out system and accessory equipment, the operational results and the performance are described. (Kako, I.)

  16. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  17. Prospects for solving environmental problems pertinent to thermal power stations

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Tumanovskii; V.R. Kotler [OAO All-Russia Thermal Engineering Institute, Moscow (Russian Federation)

    2007-06-15

    Possible ways to protect the atmosphere and water basin against harmful emissions and effluent waters discharged from thermal power stations are considered. Data on the effectiveness of different methods for removing NOx, SO{sub 2}, and ash particles, as well as heavy metals and CO{sub 2}, from these emissions and discharges are presented.

  18. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Baker, J.W.

    1982-11-01

    The case for Sizewell B in terms of the CEGB's overall duties, policies and objectives is presented. The discussion concentrates on the rationale of the CEGB's wish to proceed with Sizewell B and the implications which an eventual decision to proceed with a Pressurised Water Reactor at Sizewell could have for future power station orders. (U.K.)

  19. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McFarlane, J.D.

    1982-11-01

    The NNC construction programme for the Sizewell B nuclear power station is outlined. The following topics are considered: constructability aspects of the Sizewell B design; overall project programme and organization; NNC target construction programme; construction planning; material quantities and installation rates; site construction manpowers; construction contracting policy; site industrial relations and productivity; site management. (U.K.)

  20. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Whittle, J.

    1982-11-01

    The non-destructive testing of components for the proposed Sizewell B nuclear power station is discussed. Issues considered include: non-destructive testing techniques available; inspection of ferritic steel components during fabrication; reliability of the ultrasonic inspection of ferritic structures; inspection of components of austenitic steel; in-service inspection of the reactor coolant system. (U.K.)

  1. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Pepper, R.B.

    1982-11-01

    The practice of radiological protection within the CEGB is described. Health physics at nuclear power stations is discussed. Radiation exposure of operational staff at a PWR and radiation exposure of members of the public are considered. Finally arrangements for dealing with radiological hazards arising during a site emergency are described. (U.K.)

  2. Fuel examination at SSEB Hunterston B power station

    International Nuclear Information System (INIS)

    Angell, I.; Oldfield, D.

    1988-01-01

    After a brief description of Hunterston 'B' Power Station and its fuel, the need for post irradiation examination is established. Means of providing this on site at various stages of the fuel route are described, i.e. refuelling machine, dismantling cell and storage pond. Techniques used include the human eye, video recording and endoscopy. (author)

  3. Hinkley Point 'C' power station public enquiry: proof of evidence on coal fired power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Fothergill, S.; Witt, S.

    1988-11-01

    The Coalfield Communities Campaign (CCC) has argued that if a new base-load power station is required it should be coal-fired rather than nuclear, and that it should use UK coal. Proposals for new power stations at both Hinkley Point and at Fawley have encountered very considerable local and regional opposition, and this is increasingly likely to be the case at many other sites especially in Southern England. In contrast the CCC has sought to demonstrate that its member authorities would generally welcome the development of new coal-fired capacity on appropriate sites within their areas. In particular, this proof establishes that there is a prima facie case for considering three sites - Thorpe Marsh, Hams Hall and Uskmouth - as potential locations for a new large coal-fired power station as an alternative to Hinkley Point C. The relevant local authorities have expressed their willingness to co-operate in more detailed planning or technical investigations to secure a coal-fired power station on these sites. The CCC considers this to be a major and unprecedented offer to the CEGB and its successor bodies, which could greatly speed the development of new power staion capacity and be of considerable economic and social benefit to coalfield communities.

  4. Increased wheeze but not bronchial hyperreactivity near power stations.

    Science.gov (United States)

    Halliday, J A; Henry, R L; Hankin, R G; Hensley, M J

    1993-08-01

    In a previous study a higher than expected prevalence of asthma was found in Lake Munmorah, a coastal town near two power stations, compared with another coastal control town. This study aimed to compare atopy, bronchial hyperreactivity, and reported symptoms of asthma in the power station town and a second control area with greater socioeconomic similarity. A cross sectional survey was undertaken. Lake Munmorah, a coastal town near two power stations, and Dungog, a country town in the Hunter Valley, NSW, Australia. All children attending kindergarten to year 6 at all schools in the two towns were invited to participate in 1990. The response rates for the questionnaire for reported symptoms and associated demographic data were 92% in Lake Munmorah and 93% in Dungog, with 84% and 90% of children respectively being measured for lung function, atopy, and bronchial reactivity. There were 419 boys and 432 girls aged 5 to 12 years. Main outcome measures were current wheeze and bronchial hyper-reactivity, defined as a fall in forced expiratory volume in 1 second (FEV1) or peak expiratory flow (PEF) of 20% or more. Current wheeze was reported in 24.8% of the Lake Munmorah children compared with 14.6% of the Dungog children. Bronchial hyper-reactivity was similar for both groups--25.2% in Lake Munmorah and 22.3% in Dungog. The mean baseline FEV1 was lower in Lake Munmorah than in Dungog (p power station town, but bronchial hyper-reactivity and skin test defined atopy were similar in the two communities. These results are consistent with the previous study and confirm the increased presence of reported symptomatic illness in the town near power stations.

  5. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  6. Risk of loss power for ATWT in Daya Bay and Ling'ao nuclear power stations

    International Nuclear Information System (INIS)

    Guo Cheng

    2010-01-01

    In order to analyze the differences between the Anticipated Transient Without Reactor Trip (ATWT) and other reactor protection methods, this paper analyzes in detail the realizing means of ATWT and the effect of lost of power supply on the units based on Daya Bay and Ling'ao Nuclear Power Stations by system wiring diagram. Based on the comprehensive analysis,this paper proposes the sequence for powering when recovering the power source after ATWT power supply (LCC/LNE) loss for Daya Bay and Ling'ao Nuclear Power Stations. (authors)

  7. Institute of Philology and Intercultural Communication (Volgograd State University: Scientific and Research Innovations

    Directory of Open Access Journals (Sweden)

    Violetta S. Molchanova

    2013-01-01

    Full Text Available The paper describes different scientific innovations, applied in the course of study at the Institute of Philology and Intercultural Communication of Volgograd State University. Special attention is attached to technological component and personnel developments, aimed at the education process improvement and optimization.

  8. Ten years of KRB Gundremmingen demonstration power station

    International Nuclear Information System (INIS)

    Facius, H. von; Ettemeyer, R.

    1976-01-01

    In August 1976 the first large nuclear power station in the Federal Republic, the KRB Gundremmingen plant with a net power of 237 MWe, has been in operation ten years. The construction of KRB as a demonstration plant was a major step forward on the way to the economic utilization of nuclear power for German utilities. Design and operation of the plant have decisively influenced the further development of the technology of light water reactors in the Federal Republic. Unlike the Kahl Experimental Nuclear Power Station (VAK), which was a test facility designed to generate experience and to train personnel, the decision to build KRB from the outset was conditional upon the fulfillment of economic criteria. Here are some of the aspects in which KRB has greatly influenced the development of nuclear power station technology: first application of internal steam-water separation instead of a steam drum with a water content of the steam of less than 1%; construction of a reactor buildung with all the necessary safety factors; solution of the corrosion and erosion problems linked with the use of a saturated steam turbine; special measures taken to prevent the turbine from speeding up due to post-evaporation effects after shutdown. Detailed comments are devoted to the subjects of availability, causes of failure and repair work. (orig.) [de

  9. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  10. Shippingport Atomic Power Station decommissioning program and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F P; Skavdahl, R E

    1985-01-01

    The Shippingport Station decommissioning project is the first decommissioning of a large scale nuclear power plant, and also the first nuclear power plant to be decommissioned which has continued the power operation as long as 25 years. The nuclear facilities which have been decommissioned so far have operated for shorter period and were small as compared with commercial power reactors, but the experience gained by those decommissionings as well as that gained by nuclear plant maintenance and modification has helped to establish the technology and cost basis for Shippingport and future decommissioning projects. In this paper, the current status of the preparation being made by the General Electric Co., its subcontractor and the US Department of Energy for starting the decommissioning phase of the Shippingport Atomic Power Station is described. Also remote metal cutting, decontamination, concrete removal, the volume reduction of liquids and solids and robotics which will be applied to the project are discussed. The Shippingport Station is a 72 MWe PWR plant having started operation in 1957, and permanently shut down in 1982, after having generated over 7.4 billion kWh of electricity.

  11. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  12. Computer based training simulator for Hunterston Nuclear Power Station

    International Nuclear Information System (INIS)

    Bowden, R.S.M.; Hacking, D.

    1978-01-01

    For reasons which are stated, the Hunterston-B nuclear power station automatic control system includes a manual over-ride facility. It is therefore essential for the station engineers to be trained to recognise and control all feasible modes of plant and logic malfunction. A training simulator has been built which consists of a replica of the shutdown monitoring panel in the Central Control Room and is controlled by a mini-computer. This paper highlights the computer aspects of the simulator and relevant derived experience, under the following headings: engineering background; shutdown sequence equipment; simulator equipment; features; software; testing; maintenance. (U.K.)

  13. The Heysham 2 and Torness nuclear power station projects

    International Nuclear Information System (INIS)

    Cameron, P.J.

    1989-01-01

    At the beginning of the design of the Heysham 2 and Torness Nuclear Power Stations in the UK, it was agreed that the Hinkley Point B/Hunterston B Advanced Gas Cooled reactor design would be repeated. However, the Hinkley Point B/Hunterston B designs dated from 1964, and inevitably safety requirements had escalated in the intervening years. Furthermore, operating experience gained from Hinkley Point B/Hunterston B showed that it was desirable to make changes to particular features. Design changes were therefore included where it was considered essential to improve performance, to improve safety and to improve engineering. The resulting station designs are described. (author)

  14. Transwaal - economic district heat from the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Schatzmann, G.

    1986-01-01

    Initial study phases of the Transwaal project for distribution of heat from the Beznau nuclear power station via pipe lines to Aare and Limmat valley regions in Switzerland are presented. 500 MW heat availability through heat exchangers providing forward flow water temperature of 120 0 C, pipe line network and pumping station aspects, and the system energy flow diagram, are described. Considerations based on specific energy requirements in the year 2000 including alternative schemes showed economic viability. Investment and consumer costs and savings compared with oil and gas heating are discussed. Heat supply is guaranteed well into the 21st century and avoids environmental disadvantages. (H.V.H.)

  15. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  16. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1997 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1997; (4) Capital construction; (5) Nuclear safety; (6) Radiation safety; (7) Work safety and health protection at work; (9) Fire protection; (10) Units upgrading - safety measures; (11) Maintenance; (12) Operation; (13) Environmental impacts of operations; (14) List of balances; (15) Human sources; (16) International co-operation; (17) Public relations

  17. (Shippingport Atomic Power Station). Quarterly operating report, third quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    Zagorski, J. F.

    1980-01-01

    At the beginning of the third quarter of 1980, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. During the quarter, the Station was operated for Duquesne Light Company System grid including base load and swing load operation. Twelve (12) planned swing load operations were performed on the LWBR Core this quarter to complete the LWBR operating plan of fifty (50) during this operating phase. The Station was shutdown on September 12 for the Fall 1980 Shutdown and remained in this mode through the end of the quarter. The LWBR Core has generated 18,297.98 EFPH from start-up through the end of the quarter. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. The radioactive liquid waste effluent line to the river remained blanked off to prevent inadvertent radioactive liquid waste discharges. During the quarter, approximately 0.001 curies of Xe 133 activity were released from the station. The radioactivity released from Shippingport Station is far too small to have any measurable effect on the general background environmental radioactivity outside the plant.

  18. Stade nuclear power station (KKS): four giants on tour

    International Nuclear Information System (INIS)

    Beverungen, M.; Viermann, J.

    2008-01-01

    The Stade nuclear power station was the first nuclear power plant in the Federal Republic of Germany to deliver heat in addition to electricity. Since 1984, district heat was distributed to a saltworks nearby. The power plant, which is situated on the banks of the river Elbe, was commissioned in 1972 after approximately 4 years of construction. Together with the Wuergassen plant, it was among the first commercial nuclear power plants in this country. E.ON Kernkraft holds a 2/3 interest, Vattenfall Europe a 1/3 interest in the nuclear power plant. The Stade nuclear power station was decommissioned on November 14, 2003 for economic reasons which, in part, were also politically motivated. In September 2005, the permit for demolition of the nuclear part was granted. The release from supervision under the Atomic Energy Act is expected for 2014. In the course of demolition, the 4 steam generators of the Stade nuclear power station were removed. These components, which have an aggregate weight of approx. 660 tons, are to be safely re-used in Sweden. In September 2007, the steam generators were loaded on board the Swedish special vessel, MS Sigyn, by means of a floating crane. After shipment to Sweden, heavy-duty trucks carried the components to the processing hall of Studsvik AB for further treatment. After 6 months of treatment, the contaminated inner surfaces of the tube bundles of the steam generators have been decontaminated successfully, among other items. This has increased the volume of material available for recycling and thus decreased the volume of residues. (orig.)

  19. Occupational radiation exposures at Canadian CANDU nuclear power stations

    International Nuclear Information System (INIS)

    LeSurf, J.E.; Taylor, G.F.

    1982-09-01

    In Canada, methods to reduce the radiation exposure to workers at nuclear power reactors have been studied and implemented since the early days of the CANDU reactor program. Close collaboration between the designers, the operators, and the manufacturers has reduced the total exposure at each station, the dose requirement to operate and maintain each successive station compared with earlier stations, and the average annual exposure per worker. Specific methods developed to achieve dose reduction include water chemistry; corrosion resistant materials; low cobalt materials; decontamination; hot filtration, improved equipment reliability, maintainability, and accessibility; improved shielding design and location; planning of work for low exposure; improved operating and maintenance procedures; removal of tritium from D 2 O systems and work environments; improved protective clothing; on-power refuelling; worker awareness and training; and many other small improvements. The 1981 occupational dose productivity factors for Pickering A and Bruce A nuclear generating stations were respectively 0.43 and 0.2 rem/MW(e).a

  20. Design Provisions for Station Blackout at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Duchac, Alexander

    2015-01-01

    A station blackout (SBO) is generally known as 'a plant condition with complete loss of all alternating current (AC) power from off-site sources, from the main generator and from standby AC power sources important to safety to the essential and nonessential switchgear buses. Direct current (DC) power supplies and un-interruptible AC power supplies may be available as long as batteries can supply the loads. Alternate AC power supplies are available'. A draft Safety Guide DS 430 'Design of Electrical Power Systems for Nuclear Power Plants' provides recommendations regarding the implementation of Specific Safety Requirements: Design: Requirement 68 for emergency power systems. The Safety Guide outlines several design measures which are possible as a means of increasing the capability of the electrical power systems to cope with a station blackout, without providing detailed implementation guidance. A committee of international experts and advisors from numerous countries is currently working on an IAEA Technical Document (TECDOC) whose objective is to provide a common international technical basis from which the various criteria for SBO events need to be established, to support operation under design basis and design extension conditions (DEC) at nuclear power plants, to document in a comprehensive manner, all relevant aspects of SBO events at NPPs, and to outline critical issues which reflect the lessons learned from the Fukushima Dai-ichi accident. This paper discusses the commonly encountered difficulties associated with establishing the SBO criteria, shares the best practices, and current strategies used in the design and implementation of SBO provisions and outline the structure of the IAEA's SBO TECDOC under development. (author)

  1. (Shippingport Atomic Power Station). Quarterly operating report, fourth quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    At the beginning of the fourth quarter of 1980, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and testing program, initiated September 12, 1980. Operational testing began on November 7. Maximum power was achieved November 28 and was maintained throughout the remainder of the quarter except as noted. The LWBR Core has generated 19,046.07 EFPH from start-up through the end of the quarter. During this quarter, approximately 0.000025 curies of Xe 133 activity were released from the station. During the fourth quarter of 1980, 1081 cubic feet of radioactive solid waste was shipped out of state for burial. These shipments contained 0.037 curies of radioactivity.

  2. Quality assurance in the structural installations of nuclear power stations

    International Nuclear Information System (INIS)

    Schnellenbach, G.; Wrage, S.

    1985-01-01

    The concept of quality assurance distinguishes between self-monitoring of the design, manufacturing and executing firms and external monitoring by state institutions or by experts commissioned by them. The long-term control of structures is within the area of responsibility of the owner. This quality assurance concept is controlled in detail by statutes, which clearly define responsibilities. This structural engineering quality assurance system also forms the basis for the design, construction and utilization of structural installations of nuclear power stations; requirements emanating from the Atomic Energy Acts for the structural installations demand, however, to some extent a sharpening of self- and external monitoring. Therefore, today a quality concept has been developed for the important engineering safety-related buildings of nuclear power stations. This concept takes account of the strict requirements imposed and fulfils the requirement of KTA 1401. (orig.) [de

  3. Organization of radiation protection in German nuclear power stations

    International Nuclear Information System (INIS)

    1989-01-01

    Using the operating handbooks of the nuclear power stations in West Germany, an examination was carried out of how far the existing organisational structure for radiation protection fulfils the requirements for protection and whether a standardisation of the organisation would provide improvements for the protection of the personnel and for the practicability of the radiation protection organisation. In particular, the parts 'Personnel operating organisation', 'Radiation protection order' and 'Maintenance order' of the operating handbook were evaluated and an audit was made of the radiation protection organisation. In general, the result of the assessment is that the organisation of radiation protection does not contradict the orders, guidelines and regulations in any of the nuclear power stations examined. Corresponding to the possibilities of regulating details of the radiation protection organisation within the undertaking, the target of 'protection of the personnel against radioactive irradiation' is achieved by the various organisation structures which are largely equal to the given example. (orig./HP) [de

  4. High system-safety level of nuclear power stations

    International Nuclear Information System (INIS)

    Lutz, H.R.

    1976-01-01

    A bluntly worded disquisition contrasting the incidence of death and harm to persons in the chemical industry with the low hazards in nuclear power stations. Quotes conclusions from a U.S. accident study that the risk from 100 large power stations is 100 times smaller than from chlorine manufacture and transport. The enclosure of a reactor in a safety container, the well understood effects of radioactivity on man, and the ease of measuring leakage well below safe limits, are safety features which he considers were not matched in the products and plant of the Seveso factory which suffered disaster. Questions the usefulness of warnings about nuclear dangers when chemical dangers are much greater and road dangers very much greater still. (R.W.S.)

  5. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  6. Evaluation of Shoreham Nuclear Power Station, Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Shoreham Nuclear Power Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Shoreham T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Shoreham Nuclear Power Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  7. Radiator selection for Space Station Solar Dynamic Power Systems

    Science.gov (United States)

    Fleming, Mike; Hoehn, Frank

    A study was conducted to define the best radiator for heat rejection of the Space Station Solar Dynamic Power System. Included in the study were radiators for both the Organic Rankine Cycle and Closed Brayton Cycle heat engines. A number of potential approaches were considered for the Organic Rankine Cycle and a constructable radiator was chosen. Detailed optimizations of this concept were conducted resulting in a baseline for inclusion into the ORC Preliminary Design. A number of approaches were also considered for the CBC radiator. For this application a deployed pumped liquid radiator was selected which was also refined resulting in a baseline for the CBC preliminary design. This paper reports the results and methodology of these studies and describes the preliminary designs of the Space Station Solar Dynamic Power System radiators for both of the candidate heat engine cycles.

  8. Safety aspects of station blackout at nuclear power plants

    International Nuclear Information System (INIS)

    1985-03-01

    The principal focus of this report is on existing light water reactor nuclear power plants. However, many of the considerations discussed herein can be equally applied to new plants, i.e. those not yet in construction. This report is organized to provide a description of design and procedural factors which safety assessments and reviews of operating experience have shown to be important. These are divided into the off-site power system, the on-site AC power systems and alternate (or nearby) sources of power. The latter may be used in the unlikely event that both normal off-site and on-site sources fail. It must be emphasized that first priority should be placed on designing and maintaining high reliability of both the off-site and on-site AC power systems. This basic concept also applies to the capabilities for restoring power sources which failed and making use of all available alternative and nearby power sources during an emergency, to restore AC power in a prompt manner. Discussions on these aspects are provided in chapters 2 and 3 of this report. Because the expected event frequency and associated confidence in such estimations of station blackout are uncertain, preparations should be made to deal with a station blackout. The nature of those preparations, whether they be optimizing emergency procedures to use existing equipment, modifying this equipment to enhance capabilities, or adding new components or systems to cope with station blackout, must be made in light of plant-specific assessments and regulatory safety philosophies/requirements. Discussions on these matters are provided in chapter 4. General and specific conclusions and recommendations are provided in chapter 5. Appendix A provides a description of several case studies on station blackout and loss of off-site power. Abstracts of papers and presentations are provided in Appendix B with authors and affiliations identified to facilitate personal contact. The References and Bibliography contain a

  9. Quality assurance at a German power station company

    International Nuclear Information System (INIS)

    Czychon, K.H.

    1992-01-01

    The Integrated Operational Management System of the Emsland nuclear power station is described, together with its aims and system architecture as well as the structure and modus operandi of the Integrated Operational Management System Manager. The completion of repair work and the processing of modification and maintenance reports are explained as examples. Experience gained in the introduction and use of the system is presented. figs., 6 refs

  10. The risks at nuclear power stations and their insurance

    International Nuclear Information System (INIS)

    Schludi, H.N.

    1994-01-01

    Insurance can offer an uninterrupted insurance cover from start-up-to shut-down of a nuclear power station. This is assured by the insurance for the erection, for the nuclear liability, for the nuclear/fire, for the engines, for operational interruptions and for the transport. For each of the above mentioned insurance branches, essential characteristic features, such as risk carrier, protection range and insurance costs, are given. (orig.) [de

  11. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  12. Legionella control in power station cooling towers using oxidising biocides

    Energy Technology Data Exchange (ETDEWEB)

    Sailer, Christian; Rawlinson, Julia; Killeen, Paul [Ecolab PTY LTD, Ascot, WA (Australia)

    2009-02-15

    Power stations have used oxidising biocides such as chlorine or bromine for many years to control microbial growth in their cooling towers. In this paper Ecolab trademark looks at the direct effect halogen concentration has on Legionella populations in order to determine the most effective halogenation rate required to ensure that the site key performance indicator (KPI) of < 100 colony-forming units (cfu) per mL can be maintained. (orig.)

  13. Quality assurance grading of conventional equipment at nuclear power station

    International Nuclear Information System (INIS)

    Li Ping; Li Shichang

    2006-01-01

    Equipment QA grading with the systematic and standardized approach will benefit the concerned organizations by effective allocating of limited resources to guarantee the quality of essential equipment. This paper presents a new quality assurance grading system for the convention systems/equipment of nuclear power station, which is operative and at the same time could help the owner to allot resource reasonably through the analysis of the purpose of grading and the experience and lessons of LINGAO Phase I project. (authors)

  14. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Hawes, F.B.

    1982-11-01

    The biological consequences of using a direct cooled system at the proposed Sizewell B power station are dealt with. Problems caused by the impingement of organisms on the fine-mesh screens through which the water is pumped, by the entrainment of smaller organisms in the flow through the cooling system and by the discharge of warmed chlorinated water into the sea are discussed. The chlorination of cooling water is described. (U.K.)

  15. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Newell, J.E.

    1982-11-01

    A brief description is given of the design of the steam generators for the proposed Sizewell B power station. A review of the operational behaviour of earlier models is presented. The problem of degradation of steam generator tubes is considered in some detail. Model F steam generator, which has been incorporated into the Sizewell B reference design, is discussed. Finally the impact of steam generator tube degradation upon radiological safety is discussed. (U.K.)

  16. Notes on organization of nuclear power station construction

    International Nuclear Information System (INIS)

    Marsicanin, B.

    1977-01-01

    After a visite to some european nuclear power stations under construction and in operation, in this report a short general view on this subject is given. The progress in this in large, industrialised countries is considered as well as the relevant experience in developing countries. The new role of nuclear research institutes during construction and operation is pointed out and prospects of this cooperation evaluated. (author)

  17. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Dutton, L.M.

    1982-11-01

    A description is given of the main sources of radioactivity and the barriers which would prevent their release at the proposed Sizewell B nuclear power station. The methods of calculating the radiological consequences associated with the most significant faults within the design are outlined. The following possibilities are considered: faults involving high fuel temperatures; loss of coolant accidents; secondary coolant circuit faults; waste processing system faults; irradiated fuel faults. (U.K.)

  18. Process for treating waste water containing hydrazine from power stations

    International Nuclear Information System (INIS)

    Hoffmann, W.

    1982-01-01

    A process for treating waste water containing hydrazine from nuclear power stations is proposed, characterized by the fact that the water is taken continuously through a water decomposition cell. If the water does not have sufficient conductivity itself, a substance raising the electrical conductivity is added to the water to be treated. The electrolysis is situated in the waste water tank. (orig./RB) [de

  19. An adaptive predictive controller and its applications in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Yang Zhiyuan; Lu Huiming; Zhang Xinggao [North China Electric Power University, Beijing (China); Song Chunping [Tsinghua University, Beijing (China). Dept. of Thermal Energy Engineering

    1999-07-01

    Based on the objective function in the form of integration of generalized model error, a globally convergent model reference adaptive predictive control algorithm (MRAPC) containing inertia-time compensators is presented in this paper. MRAPC has been successfully applied to control important thermal process of more than 20 units in many Chinese power stations. In this paper three representative examples are described. Continual operation results for years demonstrate that MRAPC is a successful attempt for the practical applications of adaptive control techniques. (author)

  20. 47 CFR 74.710 - Digital low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.710 Digital low power TV and TV translator station protection. (a) An application to construct a new low power TV, TV translator, or TV...

  1. 47 CFR 74.792 - Digital low power TV and TV translator station protected contour.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.792 Digital low power TV and TV translator station protected contour. (a) A digital low power TV or TV translator will be protected from...

  2. 47 CFR 74.707 - Low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.707 Low power TV and TV translator station protection. (a)(1) A low power TV or TV translator will be protected from interference from other...

  3. Axial power deviation control strategy and computer simulation for Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Liao Yehong; Zhou Xiaoling, Xiao Min

    2004-01-01

    Daya Bay Nuclear Power Station has very tight operation diagram especially at its right side. Therefore the successful control of axial power deviation for PWR is crucial to nuclear safety. After analyzing various core characters' effect on axial power distribution, several axial power deviation control strategies has been proposed to comply with different power varying operation scenario. Application and computer simulation of the strategies has shown that our prediction of axial power deviation evolution are comparable to the measurement values, and that our control strategies are effective. Engineering experience shows that the application of our methodology can predict accurately the transient of axial power deviation, and therefore has become a useful tool for reactor operation and safety control. This paper presents the axial power control characteristics, reactor operation strategy research, computer simulation, and comparison to measurement results in Daya Bay Nuclear Power Station. (author)

  4. Concrete works in Igata Nuclear Power Station Unit-2

    International Nuclear Information System (INIS)

    Yanase, Hidemasa

    1981-01-01

    The construction of Igata Nuclear Power Station Unit-2 was started in February, 1978, and is scheduled to start the commercial operation in March, 1982. Construction works are to be finished by August, 1981. The buildings of Igata Nuclear Power Station are composed of large cross section concrete for the purpose of shielding and the resistance to earth quakes. In response to this, moderate heat Portland cement has been employed, and in particular, the heat of hydration has been controlled. In this report, also fine and coarse aggregates, admixtures and chemical admixtures, and further, the techniques to improve the quality are described. Concrete preparation plant was installed in the power station site. Fresh concrete was carried with agitator body trucks from the preparation plant to the unloading point, and from there with pump trucks. Placing of concrete was carried out, striving to obtain homogeneous and dense concrete by using rod type vibrators. Further, concrete was placed in low slump (8 - 15 cm) to reduce water per unit volume, and its temperature was also carefully controlled, e.g., cold water (temperature of mixing water was about 10 deg C) was used in summer season (end of June to end of September). As a result, the control target was almost satisfied. As for testing and inspection, visual appearance test was done as well as material testing in compliance with JIS and other standards. (Wakatsuki, Y.)

  5. Natural radionuclides near a coal-fired power station

    International Nuclear Information System (INIS)

    Smith-Briggs, J.L.

    1984-01-01

    A previous assessment of the radiological consequences of the emission of natural radionuclides from coal-fired power stations had indicated that 210 Pb was the main contributor to the maximum individual dose. This dose arose from the consumption of foodstuffs particularly cattle liver contaminated by deposited fly ash. Uncertainty surrounded some of the factors used in the assessment, and a limited environmental monitoring programme was recommended to improve it. An experiment has been performed to measure the specific activities of 210 Pb and 210 Po in livers from cattle that had grazed in a field near Didcot power station. Livers from cattle in the Cotswold region have been measured for comparison. The specific activities of 210 Pb and 210 Po in soil and grass samples from both areas have also been measured at three-monthly intervals over a year. No statistically significant increases were observed in the 210 Pb and 210 Po levels in liver, soil or grass samples which could be attributed to the operation of the power station. Transfer coefficients for 210 Pb from forage to liver were about two orders of magnitude less than that used in the original assessment, and the transfer coefficients for 210 Po about a factor a two less. (orig.)

  6. A list of abnormal occurences at Swedish nuclear power stations

    International Nuclear Information System (INIS)

    McHugh, B.

    1974-08-01

    This report consists of a list of extracts from documents belonging to Statens Kaernkraftinspektion (SKI) in Sweden. It deals with non-routine occurrences at the Swedish nuclear power stations which are in operation or where test operations of components and systems have started. The investigation has included matter about the following nuclear power plants: Barsebaeck-1, Oskarshamn-1, Oskarshamn-2, Ringhals-1, Ringhals-2, Aagesta. In all cases from the start of the test operations up to latest the 1st of June 1974. (M.S.)

  7. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Wright, J.K.

    1982-11-01

    A description is given of the CEGB's current assessment of the potential contribution to electricity generation of those methods considered to be the most significant alternatives to conventional power stations or thermal nuclear reactors for generating electricity. The state of development of the technology, the timescale on which it could be developed, its ability to generate electricity reliably and the cost of generating electricity are some of the matters considered. The following topics are covered: potential developments in coal fired generating plant; combined heat and power generation; energy storage; electricity generation from renewable energy sources; fast reactors and fusion. (U.K.)

  8. Fundamentals of asset management in an ageing nuclear power station

    International Nuclear Information System (INIS)

    Crook, B.

    2014-01-01

    In an ageing nuclear power station there are many challenges associated with implementing and refining an asset management program. Ageing nuclear power stations are faced with the formidable task of replacing and refurbishing major Structures, Systems, and Components (SSCs) in a managed and cost-effective way. This paper provides a brief background on equipment reliability and asset management, covers Bruce Power's methodology for implementing this complex and all-encompassing program, and describes one of the key challenges faced by Bruce Power and the industry. The effective scoping and identification of critical components is an on-going challenge which can affect the integrity of many processes built upon it. This is a fundamental building block to nearly all processes at Bruce Power and one that is at the centre of many improvement initiatives and projects. The consequences from lacking this baseline data, or worse relying upon incorrect data, can permeate the asset management process and hinder the organization's ability to assess risk properly and take the necessary steps to mitigate this risk in the short and long term. (author)

  9. Application of ORC power station to increase electric power of gas compression ignition engine

    Directory of Open Access Journals (Sweden)

    Mocarski Szymon

    2017-01-01

    Full Text Available The paper presents the calculation results of efficiency of the subcritical low temperature ORC power station powered by waste heat resulting from the process of cooling a stationary compression ignition engine. The source of heat to supply the ORC power station is the heat in a form of water jet cooling the engine at a temperature of 92°C, and the exhaust gas stream at a temperature of 420°C. The study considers three variants of systems with the ORC power stations with different ways of using heat source. The first variant assumes using just engine cooling water to power the ORC station. In the second variant the ORC system is powered solely by a heat flux from the combustion gases by means of an intermediary medium - thermal oil, while the third variant provides the simultaneous management of both heat fluxes to heat the water stream as a source of power supply to the ORC station. The calculations were made for the eight working media belonging both to groups of so-called dry media (R218, R1234yf, R227ea and wet media (R32, R161, R152a, R134a, R22.

  10. Cooperating expert systems for space station power distribution management

    International Nuclear Information System (INIS)

    Nguyen, T.A.; Chiou, W.C.

    1986-01-01

    In a complex system such as the manned Space Station, it is deemed necessary that many expert systems must perform tasks in a concurrent and cooperative manner. An important question to arise is: what cooperative-task-performing models are appropriate for multiple expert systems to jointly perform tasks. The solution to this question will provide a crucial automation design criteria for the Space Station complex systems architecture. Based on a client/server model for performing tasks, the authors have developed a system that acts as a front-end to support loosely-coupled communications between expert systems running on multiple Symbolics machines. As an example, they use the two ART*-based expert systems to demonstrate the concept of parallel symbolic manipulation for power distribution management and dynamic load planner/scheduler in the simulated Space Station environment. This on-going work will also explore other cooperative-task-performing models as alternatives which can evaluate inter and intra expert system communication mechanisms. It will serve as a testbed and a bench-marking tool for other Space Station expert subsystem communication and information exchange

  11. Cooperating Expert Systems For Space Station Power Distribution Management

    Science.gov (United States)

    Nguyen, T. A.; Chiou, W. C.

    1987-02-01

    In a complex system such as the manned Space Station, it is deem necessary that many expert systems must perform tasks in a concurrent and cooperative manner. An important question arise is: what cooperative-task-performing models are appropriate for multiple expert systems to jointly perform tasks. The solution to this question will provide a crucial automation design criteria for the Space Station complex systems architecture. Based on a client/server model for performing tasks, we have developed a system that acts as a front-end to support loosely-coupled communications between expert systems running on multiple Symbolics machines. As an example, we use two ART*-based expert systems to demonstrate the concept of parallel symbolic manipulation for power distribution management and dynamic load planner/scheduler in the simulated Space Station environment. This on-going work will also explore other cooperative-task-performing models as alternatives which can evaluate inter and intra expert system communication mechanisms. It will be served as a testbed and a bench-marking tool for other Space Station expert subsystem communication and information exchange.

  12. Comparison of the economy of atomic power stations and fossil-fuel power stations under Danish conditions

    International Nuclear Information System (INIS)

    Daub, J.

    1977-06-01

    The report deals with the investment and financing aspects of extending the Danish electricity production system with central, base-load power stations. Technical and economic data for the plants are determined on the basis of an analysis of the information presently available. A description is given of the general problems connected with analysis of investment and finance relevant to power station expansion. Comparative calculations are given for alternative methods of expansion comprising a few stations to be put into operation in 1987 and for other alternative expansions that cover the period until 2000 as regards costs. For use in economic comparisons with a few plants, a new calculation method was developed that takes into account possible differences in the value of the plants in the electricity production system. This method is described in appendix 1. In a further two appendices are given the technical reasons for using, respectively, the present-value method in the investment analyses and the reserve power philosophy applied in the main report. (author)

  13. Papers of 6. Scientific-Technical Seminar Material Study for Electric Power Stations and Energetics

    International Nuclear Information System (INIS)

    1999-01-01

    The report is an assembly of the papers concerning the material problems occurring during the exploitation of power station. The normalization problems in power station and gas pipelines according to the prescription of UE are also discussed. (author)

  14. Water electrolysis plants for hydrogen and oxygen production. Shipped to Tsuruga Power Station Unit No.1, and Tokai No.2 power station, the Japan Atomic Power Co

    International Nuclear Information System (INIS)

    Ueno, Syuichi; Sato, Takao; Ishikawa, Nobuhide

    1997-01-01

    Ebara's water electrolysis plants have been shipped to Tsuruga Power Station Unit No.1, (H 2 generation rate: 11 Nm 3 /h), and Tokai No.2 Power Station (H 2 generation rate: 36 Nm 3 /h), Japan Atomic Power Co. An outcome of a business agreement between Nissho Iwai Corporation and Norsk Hydro Electrolysers (Norway), this was the first time that such water electrolysis plants were equipped in Japanese boiling water reactor power stations. Each plant included an electrolyser (for generating hydrogen and oxygen), an electric power supply, a gas compression system, a dehumidifier system, an instrumentation and control system, and an auxiliary system. The plant has been operating almost continuously, with excellent feedback, since March 1997. (author)

  15. Development of heavy load carrying vehicle for nuclear power station

    International Nuclear Information System (INIS)

    Terabayashi, Yasuharu; Oono, Hiroo; Aizu, Takao; Kawaguchi, Kaname; Yamanaka, Masayuki; Hirobe, Tamio; Inagaki, Yoshiaki.

    1985-01-01

    In nuclear power stations, in order to carry out sound and stable operation, the routine inspection and regular inspection of machinery and equipment are performed, therefore, the transportation of heavy things is frequently carried out. Especially, the transportation of heavy things over the steps of passages and stairs requires much labor. Therefore, Chubu Electric Power Co., Inc. and Chubu Plant Service Co., Ltd. carried out the research on the development of a vehicle for transporting heavy components of nuclear power plants. In this research, it was aimed at developing a vehicle which can carry heavy components and get over a step, climb and descend stairs, and run through a narrow passage having many curves as well as running on flat ground. For this purpose, the actual state of the transportation of heavy things was investigated during the regular inspection of a nuclear power station, and on the basis of this results, a prototype vehicle was made and tested. Thereafter, a transporting vehicle of actual scale was made and tested. The investigation of actual state and the examination of the fundamental concept, the design, trial manufacture and verifying test are reported. (Kako, I.)

  16. Station power supply by residual steam of Fugen

    Energy Technology Data Exchange (ETDEWEB)

    Kamiya, Y.; Kato, H.; Hattori, S. (Power Reactor and Nuclear Fuel Development Corp., Tokyo (Japan))

    1981-09-01

    In the advanced thermal reactor ''Fugen'', when the sudden decrease of load more than 40% occurs due to the failure of power system, the turbine regulating valve is rapidly shut, and the reactor is brought to scrum. However, the operation of turbo-generators is continued with the residual steam in the reactor, and the power for inside the station is supplied for 30 sec by the limiting timer, then the power-generating plant is automatically stopped. The reasons why such design was adopted are to reduce manual operation at the time of emergency, to continue water supply for cooling the reactor and to maintain the water level in the steam drum, and to reduce steam release from the safety valve and the turbine bypass valve. The output-load unbalance relay prevents the everspeed of the turbo-generator when load decreased suddenly, but when the failure of power system is such that recovers automatically in course of time, it does not work. The calculation for estimating the dynamic characteristics at the time of the sole operation within the station is carried out by the analysis code FATRAC. The input conditions for the calculation and the results are reported. Also the dynamic characteristics were actually tested to confirm the set value of the limiting timer and the safe working of turbine and generator trips. The estimated and tested results were almost in agreement.

  17. Retrofit of new digital control systems in existing power stations

    International Nuclear Information System (INIS)

    Smith, J.E.; Baird, C.F.

    1986-01-01

    With the notable exception of the Canadian CANDU nuclear power stations, little use has been made of digital control in North American nuclear stations. Recently, however, there has been renewed interest in such systems within the nuclear industry in response to demands for better ergonomics in control room design and the obsolescence of control equipment whose fundamental design has changed little in 20 yr. Early in 1985, Atomic Energy of Canada Limited was asked by New Brunswick Power to advise on the redesign of the control systems for two fossil-fired generating stations, Coleson Cove and Courtenay Bay Unit 4. Coleson Cove is to be converted from oil to coal firing with consequent extensive control system changes and Courtenay Bay Unit 4 required a low-cost solution to the problem of relocating its control room from the existing isolated location to the combined control center used by units 1, 2, and 3. In both cases, the recommended solution involves the retrofit of state-of-the-art digital control systems. Although the units involved are nonnuclear the experience is applicable

  18. The economic feasibility of renewable powered fast charging stations

    Energy Technology Data Exchange (ETDEWEB)

    Benger, Ralf; Heyne, Raoul; Wenzl, Heinz; Beck, Hans-Peter

    2011-07-01

    Electric vehicles will make an important contribution for a sustainable energy supply in the public transport sector. Although it is not sure at the moment which role the different vehicle concepts and charging options will play, it is possible to act on following assumptions: There will be purely electrically operated vehicles (EV), which will need a charging infrastructure in the public domain. Even if the number of these vehicles in comparison with hybrid electric vehicles (HEV) or range extended electric vehicles (REV) will be low, in the long run an amount of some million vehicles can be reached (1 0 % of the vehicles in Germany corresponds to round about 4 million vehicles). Charging stations in parking areas, shopping malls, at home or at work do not require high charging power because the time available for charging is relative long. In contrast charging stations beside these in normal parking areas should have the ability to charge the car batteries in a very short time, e.g. 80% of the energy content in 15 minutes or less. Therefore every charging process requires 100-200 kW electric power. Such charging stations are necessary both in rural and in urban regions.

  19. Solid radwaste characterization at surry and North Anna Power Stations

    International Nuclear Information System (INIS)

    Lippard, D.W.

    1987-01-01

    This paper describes a characterization of the solid radwaste generated at Virginia Power's North Anna and Surry power stations. The primary focus of this characterization was dry active waste (DAW). The characterization, covering the 21-month period from January 1985 through September 1986, was based on information in the station's health physics procurement records, radwaste shipping records, and from interviews with station personnel. The procurement records were the principal source of information for DAW. They were reviewed to determine the quantities of various materials, purchased during the study period, that were expected to become DAW. This provides an upper limit on the quantity in the waste for several major DAW components and a basis for the total amount of other components in the waste. The approach to characterizing DAW discussed in this paper could be implemented and regularly updated by utilizing a computerized procurement records system. If a use code (i.e., contaminated or noncontaminated) is associated with each stock requisition, a characterization could be performed by a computer run. This approach would help track minimization effort effectiveness and would refine the characterization of DAW considerably

  20. Contamination awareness at the Dresden Nuclear Power Station

    International Nuclear Information System (INIS)

    Pagel, D.J.; Rath, W.C.

    1986-01-01

    Dresden Nuclear Power Station, which is located ∼ 60 miles southwest of Chicago near Morris, Illinois, has been generating electricity since 1960. Owned by Commonwealth Edison, Dresden was the nation's first privately financed nuclear station. On its site are three boiling water reactors (BWRs). Due to the contamination potential inherent with a reactor, a contamination trending program was created at the station. Studies had indicated a rise in contamination events during refueling outages. Further increases were due to specific work projects such as hydrolyzing operations. The investigations suggested that contract personnel also increased the number of events. In 1983, a contamination awareness program was created. The 1984 contamination awareness program was comprised of the following: (1) a statistical review in which trended contamination events were discussed. (2) A demonstration of protective clothing removal by an individual making various mistakes. (3) Scenarios were developed for use in mock work areas. (4) Upper management involvement. Because of the 1984 program, favorable attention has been focused on Dresden from the US Nuclear Regulatory Commission and the Institute of Nuclear Power Operations

  1. The local economic and social effects of power station siting: anticipated, demonstrated and perceived

    International Nuclear Information System (INIS)

    Glasson, J.

    1980-01-01

    The paper discusses the economic and social effects of power station siting at a local level using material based on the interim research findings from a project commissioned by the Central Electricity Generating Board. The cases for and against power station development are outlined and a review of the actual economic and social effects is presented, drawn from a study of a conventional power station at Drax and a nuclear power station at Sizewell. (U.K.)

  2. Report on the accident at the Chernobyl Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents the compilation of information obtained by various organizations regarding the accident (and the consequences of the accident) that occurred at Unit 4 of the nuclear power station at Chernobyl in the USSR on April 26, 1986. The various authors are identified in a footnote to each chapter. An overview of the report is provided. Very briefly the other chapters cover: the design of the Chernobyl nuclear station Unit 4; safety analyses for Unit 4; the accident scenario; the role of the operator; an assessment of the radioactive release, dispersion, and transport; the activities associated with emergency actions; and information on the health and environmental consequences from the accident. These subjects cover the major aspects of the accident that have the potential to present new information and lessons for the nuclear industry in general

  3. Operational results in the Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Hasegawa, Kanichi; Kato, Katsuya; Terada, Hideo; Kamata, Takakage; Kaimura, Yoshiharu

    1986-01-01

    In the Onagawa Nuclear Power Station, Unit 1 (BWR type, with electric output 524 MW) started operation in June 1, 1984. The power plant has then continued non-stop operation up to April 2, 1985, thus exhibiting its base load plant. In fiscal 1984, the continuous operation is for 342 days; the capacity factor is about 96.1 %, which is the world's top. During the period, the radioactivity releases to the environment in both liquid and gaseous wastes are below the detection limits. The collective exposure dose for plant personnel is merely 6 man-rem. Subsequently, its 1st periodical inspection was started on April 3, 1985, and finished in July the same year. So, the power plant is now again in operation. (Mori, K.)

  4. Monitoring of the operation of a nuclear power station with design problems in an importing country: The Almaraz power station

    International Nuclear Information System (INIS)

    Reig, J.

    1984-01-01

    The purpose of this paper is to describe the regulatory activities carried out in Spain as a result of the design problem occurring in the steam generators during operation of Unit I of the Almaraz nuclear power station. First, a brief introduction is given to the operating history and characteristics of Unit I of Almaraz. Particular attention is paid to the specific licences issued subsequent to commercial operation which place limitations on the operation of the station and to the operational incidents of which the Nuclear Safety Council (CSN) has been notified. Next, a description is provided of the safety evaluation carried out by the CSN. Three aspects merit particular attention: methodology, evaluation and conclusions. The methodology applied by an importing country is normally based on that of the country of origin of the design, so that the overall evaluation by the NRC has been considered sufficiently representative of aspects specific to the Almaraz power station. In this regard the importance of international collaboration is clearly seen as a principal instrument for performing the evaluation. In the evaluation a distinction is made between general and specific aspects and between inspection programmes and quality assurance requirements. In addition, the conclusions leading to the requirement of the imposition of additional limitations on the operating licence are stated. Apart from the safety evaluation carried out by the CSN, other regulatory activities have been performed over this two-year period. These activities, which include site inspections, audits of the principal supplier company, other independent calculations and so on, are described. Lastly, the paper refers to the lessons learned from the operation of the above-mentioned unit, which are immediately applicable to other Spanish nuclear power stations. (author)

  5. STUDY OF INFLUENCE OF WIND-POWER STATIONS ON BIRDS: ANALYSIS OF INTERNATIONAL PRACTICES

    Directory of Open Access Journals (Sweden)

    Gorlov P. I.

    2012-06-01

    Full Text Available The world experience of bird collisions with wind-power stations was analyzed. The detailcharacteristics of principal threats to the birds during building and exploitation of wind-power stations was done. Comparative analysis of factors caused annual birds mortality was performed. Some proposals of negative influence minimization were suggested for wind-power stations utilization.

  6. Daya Bay Nuclear Power Station operation and management indicators system

    International Nuclear Information System (INIS)

    Fang Chunfa

    2000-01-01

    Ever since the commercial operation of Daya Bay Nuclear Power Station (GNPS), dynamic objective management concept that features modern enterprises has been adopted by the station to manage all operational activities with the guidance of business plan. And some quantitative indicators have been employed in order to measure effectively the progress status of these operational activities. After several years' evolvement, a hierarchical and standard performance indicators system has been developed and is playing an active part in the plant's efforts towards top quartile of world nuclear power industry. Structured hierarchically with higher levels resolving into lower levels and lower levels committing to higher levels, the indicator system represents the corporate vision, WANO (World Association of Nuclear Operators) performance indicators, plant integrated indicators and departmental key indicators, covering such areas as safety, production, environment, human resource and cost control. The indicator system not only reflects performance-centered management concept, but also shows the controllability of the whole operational process of the station. Indicators of a certain level serve as both early warnings to superior indicators (lagging indicators in this case) and effects to inferior indicators (leading indicators in this case). The dynamic status of these indicators, numbered more than 230, will eventually be fed back to the business plan and realized through daily work of every branch, and even every member of the workforce. With the indicator system as a quantitative management tool, and an effective tracking system, GNPS has achieved great success in self-assessment, objective definition, improvement follow up, resource re-allocation, and management-staff communication. Periodic plant performance assessment is performed through spider chart and other pictorial diagrams. Indicators are displayed at the plant entrance, offices, Main Control Room and SIS network

  7. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  8. Expansion potential for existing nuclear power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Cope, D. F.; Bauman, H. F.

    1977-09-26

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers.

  9. Expansion potential for existing nuclear power station sites

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers

  10. Operating Experience at the Aagesta Nuclear Power Station

    International Nuclear Information System (INIS)

    Sandstroem, S.

    1966-09-01

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW t ) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965

  11. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S [ed.

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  12. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S. (ed.)

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  13. Sustainable Power Supply Solutions for Off-Grid Base Stations

    Directory of Open Access Journals (Sweden)

    Asma Mohamad Aris

    2015-09-01

    Full Text Available The telecommunication sector plays a significant role in shaping the global economy and the way people share information and knowledge. At present, the telecommunication sector is liable for its energy consumption and the amount of emissions it emits in the environment. In the context of off-grid telecommunication applications, off-grid base stations (BSs are commonly used due to their ability to provide radio coverage over a wide geographic area. However, in the past, the off-grid BSs usually relied on emission-intensive power supply solutions such as diesel generators. In this review paper, various types of solutions (including, in particular, the sustainable solutions for powering BSs are discussed. The key aspects in designing an ideal power supply solution are reviewed, and these mainly include the pre-feasibility study and the thermal management of BSs, which comprise heating and cooling of the BS shelter/cabinets and BS electronic equipment and power supply components. The sizing and optimization approaches used to design the BSs’ power supply systems as well as the operational and control strategies adopted to manage the power supply systems are also reviewed in this paper.

  14. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-15

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century.

  15. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    International Nuclear Information System (INIS)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-01

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century

  16. Survey of the upper Frasnian reefs: a priority exploratory operation in the Volgograd Oblast

    Energy Technology Data Exchange (ETDEWEB)

    Shakhnovskii, I.M.; Nikishin, A.G.; Lezhnev, V.M.

    1978-01-01

    A description is given of the first oil fields - the Kotov and Miroshnikov, identified in the upper Frasnian structures of reef origin in the western rim of the Umetov--Linev depression. An identification is made of survey criteria that can be used in the exploration of upper Devonian structures of reef origin. Substantiation is offered for further exploratory and survey operations in the Volgograd Oblast. 2 figures.

  17. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Mawer, W.T.

    1982-11-01

    The cooling water system which would be needed for the proposed Sizewell B power station is described. The possible effects upon public safety, local fishing interests and the existing seabed are examined. Studies of the heat dispersion from outfalls, the location of offshore structures and the control of marine growth in the system are reported. Finally the essential service water system, the reserve ultimate heat sink, the discharge of liquid radioactive waste into the sea and the possible use of waste heat for agricultural and fish farming purposes are discussed. (U.K.)

  18. Weather-power station. Solar energy, wind energy, water energy

    Energy Technology Data Exchange (ETDEWEB)

    Schatta, M

    1975-10-02

    A combined power station is described, which enables one to convert solar energy and wind energy into other forms of energy. The plant consists of a water-filled boiler, in which solar energy heats the water by concentration, solar cells, and finally wind rotors, which transform wind energy into electrical energy. The transformed energy is partly available as steam heat, partly as mechanical or electrical energy. The plant can be used for supplying heating systems or electrolysis equipment. Finally, by incorporating suitable motors, a mobile version of the system can be produced.

  19. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Edmondson, B.

    1982-11-01

    A discussion is given on the safety issues for the pressure circuit components of the proposed Sizewell B nuclear power station. The detail of the evidence concentrates on the reactor pressure vessel itself, as the principal example of a component whose failure is considered incredible. The general background to construction and operation of pressurized plant is described. A description of the form of the vessel and its role is given. Each of the factors which lead to confidence in the integrity of the vessel is then considered. (U.K.)

  20. The structural integrity safety case for Sizewell B power station

    International Nuclear Information System (INIS)

    Gerachty, J.E.

    1993-01-01

    This paper presents the safety case approach adopted for the components of the Sizewell 'B' Power Station for which a high degree of structural integrity is required. Such components include the Reactor Pressure Vessel, Steam Generator and Pressuriser for which Incredibility of Failure is claimed. The two parts of the case involve achievement and demonstration of integrity. This is achieved by extensive measures involving design, manufacture, materials and inspection. The demonstration has required a fracture mechanics approach. The specific role of inspection validation and its relation to critical defect size is described. (author)

  1. Human-factor operating concept for Borssele Nuclear Power Station

    International Nuclear Information System (INIS)

    Wieman, J.L.

    1995-01-01

    The safety level in the operation of a reactor is determined basically by human beings. The Borssele Nuclear Power Station has carried out measures for improving the man-machine interface through training and operating instructions for the shift personnel. The retrofitting of control technology relevant to safety engineering should avoid operating instructions which can cause potential failures. A safety study has shown that the remaining risk following all retrofitting measures remains dependent to the extent of 80% on human factors and that human factors as a whole have a positive effect on reactor safety. (orig.) [de

  2. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Vignes, A.

    1983-02-01

    Evidence is presented to show how the integrity of the reactor pressure vessel to be constructed for the proposed Sizewell B nuclear power station could be achieved by the French company Framatome. Following a description of the organization and experience of Framatome, their ability to manufacture the pressure vessel to the preferred design and to meet all the requirements of the National Nuclear Corporation is demonstrated. Then it is shown, using examples, how the various procurement and fabrication operations are carried out and controlled and how the quality of the materials and products is assessed and guaranteed. (U.K.)

  3. Analytical modeling of nuclear power station operator reliability

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1979-01-01

    The operator-plant interface is a critical component of power stations which requires the formulation of mathematical models to be applied in plant reliability analysis. The human model introduced here is based on cybernetic interactions and allows for use of available data from psychological experiments, hot and cold training and normal operation. The operator model is identified and integrated in the control and protection systems. The availability and reliability are given for different segments of the operator task and for specific periods of the operator life: namely, training, operation and vigilance or near retirement periods. The results can be easily and directly incorporated in system reliability analysis. (author)

  4. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  5. Sizewell 'B' power station public inquiry. CEGB proof of evidence

    International Nuclear Information System (INIS)

    Flint, R.A.

    1982-11-01

    The NNC cost estimates for the construction of the Sizewell B nuclear power station are discussed and the methods employed in their preparation are described. The preparation of the estimates for each of the major divisions of cost are outlined. These divisions are: civil engineering and building works; nuclear steam supply system; NNC costs; turbine generators; other mechanical plant; other electrical plant. The uncertainties which exist in making these estimates are discussed and the cost allowances which must be made as a result are outlined. (U.K.)

  6. Possible radiation injury at Koeberg Nuclear Power Station

    International Nuclear Information System (INIS)

    Van Rensburg, L.C.J.; De Villiers, B.; Van Zyl, C.J.

    1986-01-01

    Any injured patient from Koeberg Nuclear Power Station will be treated in the conventional manner as an acute surgical emergency; this has priority over decontamination. The ideal situation is decontamination at Koeberg before ambulance transferral to the Tygerberg Radiation Casualty Facility, but if this is not possible or complete, decontamination can be accomplished by a trained team in the unit. Teamwork is the essence at the place of injury, during transfer, in the decontamination area, in the operating theatre and during the postoperative phase. No surgical management is appropriate or complete without the very necessary guidance and advice from a physicist and the Advisory Group for Radiation Casualties

  7. Poultry litter power station in the United Kingdom

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Poultry litter has presented a waste disposal problem to the poultry industry in many parts of the United Kingdom. The plant at Eye is a small to medium scale power station, fired using poultry litter. The 12.7 MW of electricity generated is supplied, through the local utility, to the National Grid. The spent litter that constitutes the fuel is made up of excrement and animal bedding (usually 90% excrement and 10% straw or wood shavings). It comes from large climate-controlled buildings (broiler houses) where birds, reared for meat production, are allowed to roam freely. (UK)

  8. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    George, B.V.

    1982-11-01

    The design of the proposed Sizewell B power station and the policies which have guided design choices are outlined. The specification for Sizewell B and the production of its reference design are discussed. The Nuclear Steam Supply System and the associated safeguards systems are dealt with in more detail. The protection against hazards causing damage to plant and the protection provided to reduce radiation exposure are described. Control, instrumentation and operation of the plant are discussed. A section on quality of design follows. Finally economic aspects of the design are dealt with. (U.K.)

  9. U.S. Central Station Nuclear Power Plants: operating history

    International Nuclear Information System (INIS)

    1976-01-01

    The information assembled in this booklet highlights the operating history of U. S. Central Station nuclear power plants through December 31, 1976. The information presented is based on data furnished by the operating electric utilities. The information is presented in the form of statistical tables and computer printouts of major shutdown periods for each nuclear unit. The capacity factor data for each unit is presented both on the basis of its net design electrical rating and its net maximum dependable capacity, as reported by the operating utility to the Nuclear Regulatory Commission

  10. Advances in commercial heavy water reactor power stations

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1987-01-01

    Generating stations employing heavy water reactors have now firmly established an enviable record for reliable, economic electricity generation. Their designers recognize, however, that further improvements are both possible and necessary to ensure that this reactor type remains attractively competitive with alternative nuclear power systems and with fossil-fuelled generation plants. This paper outlines planned development thrusts in a number of important areas, viz., capital cost reduction, advanced fuel cycles, safety, capacity factor, life extension, load following, operator aida, and personnel radiation exposure. (author)

  11. Kaiseraugst nuclear power station: meteorological effects of the cooling towers

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Considerations of water conservation persuaded the German Government in 1971 not to allow the use of the Aar and Rhine for direct cooling of nuclear power stations. The criticism is often made that the Kaiseraugst cooling towers were built without full consideration of the resulting meteorological effects. The criticism is considered unjustified because the Federal Cooling Tower Commission considered all the relevant aspects before making its recommendations in 1972. Test results and other considerations show that the effect of the kaiseraugst cooling towers on meteorological and climatic conditions is indeed minimal and details are given. (P.G.R.)

  12. Some problems concerning the radiation protection in nuclear power stations

    International Nuclear Information System (INIS)

    Bozoky, L.

    1977-01-01

    The appearance and fast spreading of the nuclear power stations raised new and difficult questions in connection with the theoretical bases of radiation protection. The new standpoint of the International Commission on Radiological Protection is that both the workers at a pile and the inhabitants take less risk because of ionizing radiation than they usually take in everyday life. The maximum dose which can be permitted remained 5 rem/year for those who professionally deal with ionizing radiation and 0.5 rem/year for the groups in special situation. (V.N.)

  13. Return to coal at the Champagne Soise power station

    Energy Technology Data Exchange (ETDEWEB)

    Feger, M

    1981-03-01

    This power station, which comprises two 250 MW units, which came on stream in 1961 and 1965, burned coal until 1970 and fuel oil until 1977 when it was decided to revert to coal. The author describes the work and modifications carried out for this purpose: internal changes to the boilers and burners, to the coal handling and crushing arrangements and overhauling of the de-dusters and auxiliary circuits. Gives details of the organization and planning of the work involved, plus costs and distribution of expenditure. Gives the operating results and concludes that the reconversion costs were paid off within the year. (In French)

  14. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Harrison, J.R.

    1982-11-01

    An overview is given of the Safety Case for the Sizewell B nuclear power station as presented in the Pre-Construction Safety Report. Information which has been made available since its publication is included. Safety is considered for normal operation of the reactor and under fault conditions. Faults considered are those due to external hazards such as earthquakes, extreme weather conditions and aircraft crashes, internal hazards such as fire and missiles and reactor faults. Reactor fault studies described include transient analyses of pressurised faults and of loss-of-coolant accidents and the evaluation of the radiological consequences of design basis faults. (U.K.)

  15. Electric motorcycle charging station powered by solar energy

    Science.gov (United States)

    Siriwattanapong, Akarawat; Chantharasenawong, Chawin

    2018-01-01

    This research proposes a design and verification of an off-grid photovoltaic system (PVS) for electric motorcycle charging station to be located in King’s Mongkut’s University of Technology Thonburi, Bangkok, Thailand. The system is designed to work independently (off-grid) and it must be able to fully charge the batteries of a typical passenger electric motorcycle every evening. A 1,000W Toyotron electric motorcycle is chosen for this study. It carries five units of 12.8V 20Ah batteries in series; hence its maximum energy requirement per day is 1,200Wh. An assessment of solar irradiation data and the Generation Factor in Bangkok, Thailand suggests that the charging system consists of one 500W PV panel, an MPPT charge controller, 48V 150Ah battery, a 1,000W DC to AC inverter and other safety devices such as fuses and breakers. An experiment is conducted to verify the viability of the off-grid PVS charging station by collecting the total daily energy generation data in the raining season and winter. The data suggests that the designed off-grid solar power charging station for electric motorcycle is able to supply sufficient energy for daily charging requirements.

  16. Isar-2 nuclear power station twenty-five years

    International Nuclear Information System (INIS)

    Fischer, Erwin; Luginger, Markus

    2013-01-01

    The Isar-2 nuclear power station (KKI 2) began commercial power operation on April 9, 1988. In these past 25 years the plant generated a total of approx. 285 billion kWh of electricity. The annual electricity production of KKI 2 of approx. 12 billion kWh corresponds to a share of approx. 15 % in the cumulated Bavarian electricity production. This amount of electricity, theoretically, could supply some 3 million three person households, or meet two thirds of the electricity requirement of the Bavarian industry, for one year. In its 25 years of power operation the Isar-2 nuclear power plant has recorded the highest annual gross electricity production of all nuclear power plants in the world nine times so far. A plant performance as impressive as this necessitates a plant availability far above the average. This, in turn, is based on short revision times and faultfree plant operation. However, high plant safety and availability must not be taken for granted, but are the result of responsible, safety-minded plant operation combined with continuous plant optimization and permanent execution of comprehensive checks, inspections, and maintenance measures. Besides plant technology also organization and administration were permanently advanced and adapted to changing requirements so as to safeguard reliable, safe, and non-polluting plant operation.

  17. Procedures for permission of installation of nuclear power stations

    International Nuclear Information System (INIS)

    Narita, Yoriaki

    1980-01-01

    The locations of atomic power stations are first selected by electric power enterprises in consultation with the Ministry of International Trade and Industry or under the guidance of authorities concerned. The surveys of the climate, topography, water and plants in the planned sites and the influences of nuclear power generation to the surrounding areas are made by the enterprisers under the administrative guidance of the MITI. Secondly, the basic project shall be submitted to and decided by the Power Resource Development Council headed by the Prime Minister (Article 10, the Power Resource Development Law). The Council shall, if necessary, call for the attendance of the governors of prefectures concerned and hear their opinions (Article 11, the Law). As the third and most complicated phase, various procedures include; (a) permission of the changes of electrical facilities under the Electricity Enterprises Act; (b) authorization of the installation of reactors under the Nuclear Reactor Regulation Law; (c) permission or authorization under other regulations including the Agricultural Land Act, etc.; (d) additional procedures related to the indemnification to fishery and so forth. Finally the reactors are to be operated after receiving the certificates of the Minister of ITI on the inspections of construction works, nuclear fuel materials used for the reactors and welding processes of reactor containment vessels, boilers, turbines, etc. (Okada, K.)

  18. Assuring benefits from advanced mathematical modeling of fossil power stations

    International Nuclear Information System (INIS)

    Divakaruni, S.M.; Hottenstine, R.D.

    1990-01-01

    Although the capability to model power plants and power plant control systems has progressed rapidly during the last two decades, the quality of control found in the best controlled stations of the 1960's and 1970's has not been improved to any great extent as a result of the improved hardware and the systems presently being installed. This paper presents a review of the probable reasons for the limited success in transferring good dynamic modeling technology into useful benefits for the power industry. The authors suggest that a major reason for this lack of success is a lack of understanding of the needs and the present capabilities of the power industry by the modeling community. They establish a state-of-the-art power plant control to assist investigators in directing their efforts toward true needs and to assist them in judging the potential for improvement through their efforts to utilize improved dynamic analysis methods. The United States has already initiated an effort to improve the transfer of technology into beneficial use in the utility industry and it is suggested that the methods they have developed can be used for improvement on an international scale

  19. THE STATE OF ARTERIAL HYPERTENSION DIAGNOSTICS AND TREATMENT, ACCORDING TO THE RESULTS OF THE POLL AMONG PHYSICIANS OF VOLGOGRAD AND VOLGOGRAD REGION

    Directory of Open Access Journals (Sweden)

    S. Y. Martsevich

    2005-01-01

    Full Text Available Aim. Assessment and quality of diagnostics of treatment of patients with arterial hypertension (AH and their conformity with international and national recommendations on AH.Material and methods. The poll among physicians of Volgograd and Volgograd region, who took part in the regional conference, devoted to the problems of AH, was carried out in April 2004. The questionnaire included 13 questions about peculiarities of AH patients’ management 128 physicians took part in the poll, from them 90 thetapeutists (general physicians, 24 cardiologists, and 14 physicians of different therapeutic specializations.Results. Variability of conceptions of physicians on some principals of diagnostics and treatment of AH patients is revealed. Insufficient knowledge of criteria for division patients according to the risk category of cardiovascular complications. The same is observed for definition of AH grade according to the blood pressure level, and of the main approaches AH patients treatment. From all the questioned physicians only 25.2% correctly evaluated the risk level of cardiovascular diseases, 21% of physicians wrongly assessed the AH grade according to the blood pressure Level.Conclusion. Results, show that real practice of diagnostics and treatment of AH significantly deviates from international and national recommendations on AH.

  20. THE STATE OF ARTERIAL HYPERTENSION DIAGNOSTICS AND TREATMENT, ACCORDING TO THE RESULTS OF THE POLL AMONG PHYSICIANS OF VOLGOGRAD AND VOLGOGRAD REGION

    Directory of Open Access Journals (Sweden)

    S. Y. Martsevich

    2015-12-01

    Full Text Available Aim. Assessment and quality of diagnostics of treatment of patients with arterial hypertension (AH and their conformity with international and national recommendations on AH.Material and methods. The poll among physicians of Volgograd and Volgograd region, who took part in the regional conference, devoted to the problems of AH, was carried out in April 2004. The questionnaire included 13 questions about peculiarities of AH patients’ management 128 physicians took part in the poll, from them 90 thetapeutists (general physicians, 24 cardiologists, and 14 physicians of different therapeutic specializations.Results. Variability of conceptions of physicians on some principals of diagnostics and treatment of AH patients is revealed. Insufficient knowledge of criteria for division patients according to the risk category of cardiovascular complications. The same is observed for definition of AH grade according to the blood pressure level, and of the main approaches AH patients treatment. From all the questioned physicians only 25.2% correctly evaluated the risk level of cardiovascular diseases, 21% of physicians wrongly assessed the AH grade according to the blood pressure Level.Conclusion. Results, show that real practice of diagnostics and treatment of AH significantly deviates from international and national recommendations on AH.

  1. Public relations activities of the Service Hall for Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kono, T.

    1998-01-01

    This article includes information of the Service Hall for Kashiwazaki-Kariwa Nuclear Power Station. About 30% of the total electricity production in Japan is due to 16 power stations and 52 reactors. The service hall is a kind of atomic power pavilion for public relations. In Japan, each nuclear power station has such a pavilion, which acts a a center of public relations activities for the atomic power. (S. Grainger)

  2. Preoperation of Hamaoka Nuclear Power Station Unit No. 4

    International Nuclear Information System (INIS)

    Fukuyo, Tadashi; Kurata, Satoshi

    1994-01-01

    Chubu Electric Power Co. finished preoperation of Hamaoka Nuclear Power Station Unit No. 4 in September, 1993. Although unit 4 has the same reactor design as unit 3, its rated electrical output (1,137MW) is 37MW more than that of unit 3. This increase was achieved mainly by adopting a Moisture Separater Heater in the turbine system. We started preoperation of unit 4 in November 1992 and performed various tests at electrical outputs of 20%, 50%, 75%, and 100%. We finished preoperation without any scram or other major problems and obtained satisfactory results for the functions and performance of the plant. This paper describes the major results of unit 4 preoperation. (author)

  3. Representations and types of organizational errors in nuclear power station

    International Nuclear Information System (INIS)

    Li Yongjuan; Wang Erping; Li Feng; Yu Guangtao

    2003-01-01

    The aim of this study is to explore the organizational errors that affect the safety of the nuclear power station,with the methods of interview and events re-analysis. Coding method has been used to change the qualitative data to quantitative data. After cluster analysis, five organizational factors in nuclear power field have been obtained, including technical management factors, non-technical management factors, information interface, organizational planning, and lack of holistic thinking. The study also finds that compared to the technical management factors, non-technical management factors have greater affects on the safety of the system. So the non-technical training is essential to insure the safety of the system

  4. High pressure axial flow fans for modern coal power stations

    Energy Technology Data Exchange (ETDEWEB)

    Cyrus, Vaclav [AHT Energetika s.r.o., Praha (Czech Republic); Koci, Petr [ZVVZ Milevsko a.s. (Czech Republic)

    2008-07-01

    Brown coal fired power stations, located in Northern Bohemia, have mostly older boiler blocks with an output of 110 and 200 MWe. Flue gases are cleaned by the desulphurization plants installed between 1993 and 1997. Usually, each boiler block has two air fans and one to three flue gas fans. Flue gas fans operate in severe conditions; fan blades should be resistant to the flue gases containing sulphur and acid drops with the operating temperature at 170 C to 190 C. Additionally, flue gas also often contains ash particles. Currently, some boiler blocks are gradually being refurbished. New blocks with an electrical power output of 600 to 700 MWe are at the design stage. Submitted paper shows our design study of one stage axial flow fan for the new blocks. Results from the new aerodynamic research of the axial flow stages were used in the fan design. (orig.)

  5. Overall strategy of Creys Malville power station dismantling

    International Nuclear Information System (INIS)

    Alphonse, P.

    2002-01-01

    The power station was stopped by a government decision following the elections in 1997. This shutdown was then made official by a letter dated April 1998 and the decree of December 1998. This was a non-technical shutdown and as such had not been envisaged; there has been no early warning. Current dismantling strategy: The studies leading to shutdown and then dismantling were engaged in 1998 based on a scenario with a status corresponding to IAEA level 2 until 2046. In 2001, EDF management made the decision to dismantle all the first generation power stations and Creys Malville between now and 2025. It should be noted that the presence of strongly irradiated stellite in the Creys Malville reactor would still require remote systems for working in the reactor block after 2046. The sequence of operations dictated by the dismantling strategy is as follows: eliminate the risks as soon as possible and in particular the risk related to the sodium, 3300 tonnes of which is kept in liquid form in the reactor vessel; dismantle the most active parts which are too radioactive to be sent to the existing or planned storage centres. This may lead to on-site storage to allow decay to occur before sending to a storage centre; planning of the work interventions in order to limit the costs

  6. Return on experience on control gates in nuclear power station

    International Nuclear Information System (INIS)

    Valendru, N.

    2009-01-01

    In application of an EDF internal directive, control gates are used at the exit of the Controlled Areas of each nuclear power station site for the radiological control of materials or wastes on pedestrians and vehicles. The author first presents the radiological control chain for people and its principles. This chain comprises the different controls performed within the controlled area, either at the exit of a works area or at the exit of the reactor building, the different controls performed at the exit of the controlled area (depending on the site classification), the control of pedestrians at the site exit, and the 'whole body' anthropo-gamma-metric control. For each of these controls, the authors indicate the detection objectives, the different contamination threshold values, and the type of gate used. In a second part, the authors more precisely present the new C2 gates which include gamma and beta sensors, indicate how control thresholds are adjusted on different power station sites, and discuss the lessons learned after the first years of use of these new gates (difficulties and problems faced as far as detection and detection thresholds are concerned, changes in organization)

  7. Radioecological investigations of the Bilibino Nuclear Power Station area

    Energy Technology Data Exchange (ETDEWEB)

    Emelyanova, L.; Neretin, L. [Moscow State Univ. (Russian Federation). Geographical Faculty]|[Russian Academy of Sciences, Moscow (Russian Federation). P.P. Shirshov Inst. of Oceanology

    1995-12-31

    The landscape structure of the territory and the current radioactive state of ecosystems in the vicinity of Bilibino Nuclear Power Station (Western Chukotka Peninsula) within the area of its potential influence on the environment were studied in 1989--1990. Accumulation of strontium-90 and cesium-137 radionuclides in several key biological members of the ecosystems has been analyzed. Maximal weighted content of cesium-137 was revealed in mountain pine cones (Pinus pumila) -- 9,200 Bq/kg.d.w., cowberry fruits have demonstrated considerable contamination by strontium and cesium isotopes. The purification of first two components of food chain ``lichen-reindeer-man`` was pointed out in the investigated area. Besides the chemical characteristics, visual biological anomalies of biocomponents nearby the Bilibino NPS ecosystems are observed. On the basis of field radioecological investigations and future work, programs were developed for the conditions of the Bilibino Nuclear Power Station area. This experience could be applied to the researches of radioactive contamination in ecosystems of other northern territories.

  8. French experience in operating pressurized water reactor power stations. Ten years' operation of the Ardennes power station

    International Nuclear Information System (INIS)

    Teste du Bailler, A.; Vedrinne, J.F.

    1978-01-01

    In the paper the experience gained over ten years' operation of the Ardennes (Chooz) nuclear power station is summarized from the point of view of monitoring and control equipment. The reactor was the first pressurized water reactor to be installed in France; it is operated jointly by France and Belgium. The equipment, which in many cases consists of prototypes, was developed for industrial use and with the experience that has now been gained it is possible to evaluate its qualities and defects, the constraints which it imposes and the action that has to be taken in the future. (author)

  9. The planning of areas near nuclear power stations

    International Nuclear Information System (INIS)

    1977-01-01

    During the past five years national physical planning has been initiated by the Swedish Parliament. Guidelines have been given to the communities how to consider national interests when drawing up local planning and how to produce maps and descriptions of the planning. For the planning of the areas near the nuclear power stations the municipalities have certain guidelines from The Nuclear Power Inspectorate and The National Institute of Radiation Protection. It is advised to keep a low population density near the power plants, to avoid the type of harbour or industry which could have disturbing effects on the power plant and also to avoid to concentrate people, who are difficult to move from the area in case of an accident (i.e., homes for old people, maternity homes and prisons). The plants on the East Coast, Forsmark and Oskarshamn, are located in wooded areas with a very low population density. On the West Coast, near Ringhals and Barsebaeck, the population density is higher, and there is one village with about 2,000 inhabitants, situated at a distance of two (2) km from the Ringhals power plant. The Control Boards are now reluctant to concentrate more people in this village, where schools and shops were earlier planned for 3,000 inhabitants. The building activity near power plants is regulated by law. New buildings are prohibited within a distance of two (2) km from the plants. Some exeptions can be granted by the County Administrative Board after guidance from the Central Board. In a zone reaching 10 kilometers from the power plants there are no regulations by law about new buildings, except the earlier mentioned guidelines from the Central Boards to maintain a low population. (L.E.)

  10. Station Blackout Analysis of HTGR-Type Experimental Power Reactor

    Science.gov (United States)

    Syarip; Zuhdi, Aliq; Falah, Sabilul

    2018-01-01

    The National Nuclear Energy Agency of Indonesia has decided to build an experimental power reactor of high-temperature gas-cooled reactor (HTGR) type located at Puspiptek Complex. The purpose of this project is to demonstrate a small modular nuclear power plant that can be operated safely. One of the reactor safety characteristics is the reliability of the reactor to the station blackout (SBO) event. The event was observed due to relatively high disturbance frequency of electricity network in Indonesia. The PCTRAN-HTR functional simulator code was used to observe fuel and coolant temperature, and coolant pressure during the SBO event. The reactor simulated at 10 MW for 7200 s then the SBO occurred for 1-3 minutes. The analysis result shows that the reactor power decreases automatically as the temperature increase during SBO accident without operator’s active action. The fuel temperature increased by 36.57 °C every minute during SBO and the power decreased by 0.069 MW every °C fuel temperature rise at the condition of anticipated transient without reactor scram. Whilst, the maximum coolant (helium) temperature and pressure are 1004 °C and 9.2 MPa respectively. The maximum fuel temperature is 1282 °C, this value still far below the fuel temperature limiting condition i.e. 1600 °C, its mean that the HTGR has a very good inherent safety system.

  11. Main unit electrical protection at Sizewell 'B' power station

    International Nuclear Information System (INIS)

    Fischer, A.; Keates, T.

    1992-01-01

    For any power station, reliable electrical protection of the main generating units (generators plus generator transformers) has important commercial implications. Spurious trips cause loss of generation and consequent loss of revenue, while failure to rapidly isolate a fault leads to unnecessary damage and again, loss of generation and revenue. While these conditions apply equally to Sizewell B there are additional factors to be taken into consideration. A spurious trip of a main generating unit may lead to a trip of the reactor with an associated challenge to the shutdown and core cooling plant. The generator transformers, besides exporting power from the generators to the 400 kV National Grid, also import power from the Grid to the 11 kV Main Electrical System, which in turn is the preferred source of supply to the Essential Electrical System. The Main Unit Protection is designed to clear generator faults leaving this off-site power route intact. Hence failure to operate correctly could affect the integrity of the Essential Electrical Supplies. (Author)

  12. 76 FR 72849 - Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend...

    Science.gov (United States)

    2011-11-28

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend Rules... for Digital Low Power Television, Television Translator, and Television Booster Stations and to Amend... television, TV translator, and Class A television station DTV licensees''). The Commission has also revised...

  13. 75 FR 63766 - Digital Low Power Television, Television Translator, and Television Booster Stations and Digital...

    Science.gov (United States)

    2010-10-18

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and Digital Class A... TV, TV Translator or TV Booster Station, FCC Form 346; 47 CFR 74.793(d); LPTV Out-of-Core Digital... collection requirements: 47 CFR 74.793(d) proposes that certain digital low power and TV translator stations...

  14. Optimized Envelope Tracking Power Supply for Tetra2 Base Station RF Power Amplifier

    DEFF Research Database (Denmark)

    Høyerby, Mikkel Christian Wendelboe; Andersen, Michael Andreas E.

    2008-01-01

    An ultra-fast tracking power supply (UFTPS) for envelope tracking in a 50kHz 64-QAM Tetra2 base station power amplification system is demonstrated. A simple method for optimizing the step response of the PID+PD sliding-mode control system is presented and demonstrated, along with a PLL-based scheme...... application. Also demonstrated is the effect of non-zero UFTPS output impedance on envelope tracking performance. At 13W average (156W peak) RF output, a reduction of DC input power consumption from 93W (14% efficiency) to 54W (24% efficiency) is obtained by moving from a fixed RF power amplifier supply...

  15. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  16. (Shippingport Atomic Power Station). Quarterly operating report, third quarter 1979

    Energy Technology Data Exchange (ETDEWEB)

    Jones, T. D.

    1979-01-01

    At the beginning of the third quarter of 1979, the Shippingport Atomic Power Station remained shutdown to complete repairs of the turbine generator hydrogen circulation fan following discovery of a rubbing noise on May 24, 1979. The Station was in a cooldown condition at approximately 180/sup 0/F and 300 psig with a steam bubble in the pressurizer and the reactor coolant pumps in slow speed. The reactor plant cooldown heat exchanger was in service to maintain coolant temperature. The 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops remained in service. All expended PWR Core 2 fuel elements have previously been shipped off-site. The remaining irradiated PWR Core 2 core barrel and miscellaneous refueling tools were in storage under shielding water in the deep pit of the Fuel Handling Building. The LWBR Core has generated 12,111.00 EFPH from startup through the end of the quarter.

  17. Report on the accident at the Chernobyl Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-12-01

    This report presents the compilation of information obtained by various organizations regarding the accident (and the consequences of the accident) that occurred at Unit 4 of the nuclear power station at Chernobyl in the USSR on April 26, 1986. Each organization has independently accepted responsibility for one or more chapters. The specific responsibility of each organization is indicated. The various authors are identified in a footnote to each chapter. Very briefly the other chapters cover: the design of the Chernobyl nuclear station Unit 4; safety analyses for Unit 4; the accident scenario; the role of the operator; an assessment of the radioactive release, dispersion, and transport; the activities associated with emergency actions; and information on the health and environmental consequences from the accident. These subjects cover the major aspects of the accident that have the potential to present new information and lessons for the nuclear industry in general. The task of evaluating the information obtained in these various areas and the assessment of the potential implications has been left to each organization to pursue according to the relevance of the subject to their organization. Those findings will be issued separately by the cognizant organizations. The basic purpose of this report is to provide the information upon which such assessments can be made

  18. Sizewell B: consent application for Britain's first PWR power station

    International Nuclear Information System (INIS)

    1981-02-01

    The Central Electricity Generating Board has applied to the Secretary of State for Energy for consent and for other necessary permissions to construct a nuclear power station of about 1200 MW output capacity based on the pressurised water reactor (PWR) system on the Board's existing site at Sizewell (near Leiston) in Suffolk to be known as Sizewell B. Application has also been made to the Health and Safety Executive to extend the existing nuclear site licence to permit the use of the site for a pressurised water reactor. The Secretary of State for Energy has already stated that a Public Inquiry will be held into the application and this is expected to take place in 1982. The Board is making these applications now to give ample time for public discussion and consultation. Construction of the station could not begin until the outcome of the Public Inquiry is known and the necessary consents, nuclear licence and clearances have been given. The text of the application is presented. Some background information is given. (author)

  19. Radioactive waste management at nuclear electric power stations

    International Nuclear Information System (INIS)

    Gordelier, S.C.

    1993-01-01

    After suitable treatment, gaseous and liquid wastes are routinely discharged from Nuclear Electric's stations and are diluted and dispersed in the environment. The discharges are controlled and authorized under UK legislation and the environmental impact is minimal. Most solid wastes were originally accumulated at the site of origin, but since 1978 low level wastes (LLW) have been send to the UK's main disposal site at Drigg. Recent changes at Drigg have resulted in changed arrangements for the transport and disposal of low-level wastes, including volume reduction by supercompaction. Small amounts of intermediate-level waste (ILW) have been conditioned and disposed of in the sea but this route is now effectively closed and there is currently no disposal route for ILW in the UK. Spent ion exchange resins at one power station have been conditioned and are stored pending the availability of a disposal route. Most ILW will continue to be stored in retrievable form on the site of origin until a mobile waste treatment plant can be brought into use. The timing of this will be subject to agreement with the regulators. In the case of Magnox fuel element debris, a demonstration dissolution plant has been constructed and this will significantly reduce the volume of waste being stored while retaining the bulk of the activity on site for later treatment. A further development has been the construction of a new facility which will hold Magnox fuel element debris in 500 liter drums

  20. Nuclear weapons and nuclear power stations: what is the connection

    International Nuclear Information System (INIS)

    Spencer, K.

    1985-01-01

    From the start of the nuclear age with the dropping of two atom bombs on Japan in 1945 it has been known that this new source of primary energy could be exploited for weapons or for replacing coal or oil in electricity-generating stations. Nuclear energy is made from two elements: naturally occurring uranium and man-made plutonium. Their processing differs according to the intended end-use. Great efforts have been and still are made to disguise the close connection between nuclear energy for war and for power stations. Two reasons are suggested for this: political conveniences in avoiding additional informed protests against nuclear weapon production and industrial convenience in carrying on without public protest what has become a very profitable industry. It is argued that medical doctors, because of their professional prestige, can speak and be listened to on the risks of continuing to exploit this newly discovered form of energy. Furthermore, this industry is uniquely hazardous to the health of its workers, to the public generally and possibly to the procreation and genetic health of future generations. (author)

  1. 76 FR 82201 - General Site Suitability Criteria for Nuclear Power Stations

    Science.gov (United States)

    2011-12-30

    ... guidelines in identifying suitable candidate sites for nuclear power stations. The decision that a station... combination and a cost-benefit analysis comparing it with alternative site-plant combinations, as discussed in...

  2. The regional income and employment impacts of nuclear power stations

    International Nuclear Information System (INIS)

    McGuire, A.

    1982-01-01

    This paper attempts quantitatively to assess the income and employment impacts associated with two nuclear establishments in Scotland: the United Kingdom Atomic Energy Authority (U.K.A.E.A.) nuclear power establishment at Dounreay in Caithness and the South of Scotland Electricity Board (S.S.E.B.) nuclear power station presently under construction at Torness in the Lothian region. The model used is a basic Keynesian income multiplier model refined to allow detailed analysis of income and employment impacts at a local level. As used in this study it allows the identification of the increase in income and the associated increase in employment relating to the siting of a nuclear power plant in a particular locality. Results are given. The employment multipliers are estimated to be in the range 1.236 to 1.535 for Dounreay and 1.294 to 1.675 for the operational phase of the Torness plant. It is concluded that although the absolute income increases in the respective subregions are significant, compared to the total annual expenditure of the establishments these figures indicate high leakage from the subregions. (UK)

  3. Waste heat of HTR power stations for district heating

    International Nuclear Information System (INIS)

    Bonnenberg, H.; Schlenker, H.V.

    1975-01-01

    The market situation, the applied techniques, and the transport, for district heating in combination with HTR plants are considered. Analysis of the heat market indicates a high demand for heat at temperatures between 100 and 150 0 C in household and industry. This market for district heating can be supplied by heat generated in HTR plants using two methods: (1) the combined heat and power generation in steam cycle plants by extracting steam from the turbine, and (2) the use of waste heat of a closed gas turbine cycle. The heat generation costs of (2) are negligible. The cost for transportation of heat over the average distance between existing plant sites and consumer regions (25 km) are between 10 and 20% of the total heat price, considering the high heat output of nuclear power stations. Comparing the price of heat gained by use of waste heat in HTR plants with that of conventional methods, considerable advantages are indicated for the combined heat and power generation in HTR plants. (author)

  4. Wind rotor power station BONI-ShHV

    International Nuclear Information System (INIS)

    Bolotov, A.V.

    1999-01-01

    Wind rotor power station (WRPS) BONI-ShHV has following advantages : the increase of installation stability by rise of wind velocity and rotation speed of rotor due to gyroscopic effect; the absence noise and vibration; the safety for birds and animals; ability of compact installation and creation of series of wind power dams with higher capacity; the simplicity and fast assembling and putting into operation. The price of 1 k W of installing capacity is lower about 2.5-3 times compare to usual WRPS due to simple kinematic scheme. WRPS has high specific output of electrical energy due to use of low and long existing wind velocity and due to short storms, giving greater power. It has ability to be replayed when average annual wind velocity is above 5.5 m/s in comparison with propeller WRPS, which are never repaying. WRPS BONI-ShHV are made on the plants of Republic of Kazakhstan, and tested in wind velocity range up 45 m/s, have experience of 3 years of operation, showing their reliability and effectiveness. The repayment period of individual WRPS BONI-0.5/6 ShHV is from 10 month to 1 year depending on average annual velocity

  5. Outline of additional installation works in Oi Nuclear Power Station

    International Nuclear Information System (INIS)

    Shibata, Atsuo; Matsuoka, Motokazu

    1987-01-01

    At present in Oi Nuclear Power Station, Kansai Electric Power Co., Inc., No.1 and No.2 plants of 1175 MWe each are in operation. In order to stabilize power supply for a long term, the additional installation of No.3 and No.4 plants of 1180 MWe each is in progress. The No.3 and No.4 plants are PWRs, for which prestressed concrete reactor containment vessels were adopted, and the start of operation is scheduled in October, 1991 in No.3 plant and in August, 1992 in No.4 plant. In the execution of main construction works, the preservation of the existing plants is the most important. For excavating the tunnels for seawater channels, tunnel boring machines were used, to avoid blasting. Pneumatic caisson method was adopted for a part of the circulating pump building. No vibration, no noise piling method was adopted for respective sheathing construction. The blasting vibration control in the excavation for foundations and the analysis of the behavior of retaining walls are to be carried out by information-oriented work execution. The outline of the main construction works and the preservation of the existing facilities are reported. (Kako, I.)

  6. The PADE dosimetry system at the Brokdorf nuclear power station

    International Nuclear Information System (INIS)

    Poetter, Karl-Friedrich; Eckelmann, Joerg; Kuegow, Mario; Spahn, Werner; Franz, Manfred

    2002-01-01

    The PADE program system is used in nuclear power plants for personnel and workplace dosimetry and for managing access to the controlled area. On-line interfaces with existing dose determination systems allow collection, surveillance and evaluation functions to be achieved for person-related and workplace-related dose data. This is managed by means of open, non-proprietary communication of PADE with the computer system coupled via interfaces. In systems communication, PADE is limited to main interventions into outside systems, thus ensuring flexible adaptation to existing systems. As a client-server solution, PADE has been developed on the basis of an ORACLE-8 database; the version presented here runs on a Windows NT server. The system described has been used at the Brokdorf Nuclear Power Station since early 2000 and has so far reliably managed more than one million individual access movements of more than 6 000 persons. It is currently being integrated into a comprehensive plant operations management system. Among other things, PADE offers a considerable development potential for a tentatively planned future standardization of parts of the dosimetry systems in German nuclear power plants and for the joint management of in-plant and official dose data. (orig.) [de

  7. Change of local social economy accompanying location of power stations

    International Nuclear Information System (INIS)

    Arai, Yasuo; Saito, Kannosuke

    1982-01-01

    The method of environment assessment is urgently developed to make various development plans appropriate. It is desirable to grasp synthetically direct and indirect influences to society, since various development activities are deeply related to whole local societies. The Central Research Institute of Electric Power Industry has performed research to develop the method of synthesizing environment assessment, and this is the interim report on the development of the method for forecasting and evaluating the social influence accompanying the location of power stations. As the first approach, the development of the model to forecast the influence of location was started, using the econometric method. In this paper, the works of composing the pilot model, which was made to examine the possibility of model development, are summarized. The fundamental framework of model composition and the theoretical model for each power source and each locality were examined, and the works of making the proving models related to three points based on the theoretical model were carried out. As the result of this work of pilot model composition, the prospect of developing the econometric model for forecasting social environmental influence was obtained, and the works of developing the more versatile master model are advanced at present. (Kako, I.)

  8. Nuclear instrument upgrade at Connecticut Yankee Atomic Power Station

    International Nuclear Information System (INIS)

    Brothers, M.H.; Flynn, B.J.; Shugars, H.G.

    1989-01-01

    After 20 years of commercial operation, the Connecticut Yankee Atomic Power Station decided to replace the original nuclear instrument system. The plant was motivated primarily by reliability and maintainability problems, the former attributed to equipment wearout and discrete component failure, and the latter to the unavailability of qualified spare parts, another effect of the equipment's age. In replacing the system, the plant also had to address current regulatory, design, and plant technical specification requirements, including physical separation, signal isolation, and changes in equipment qualification. This paper discusses the motivation for the system's replacement, the challenges to the plant engineers and equipment designers, the ways in which the new design met the challenges, the test results of the new system, and other potential benefits supported by the test results

  9. Esfas: An information system on worldwide nuclear power stations

    International Nuclear Information System (INIS)

    Melis, M.

    1990-01-01

    While performing the analysis and transcoding of about 30.000 abnormal events happened in nuclear power stations, in the frame of the AORS - Abnormal Occurrences Reporting System project (CEC-Joint Research Centre, Ispra), it was clear to the transcoders (12 nuclear engineers) that, for a good understanding of the true sequence and safety relevance of events, it was necessary to identify the plant layout and the characteristics of safety and auxiliary systems. This exigence, together with the systematic collection of publicly available information (safety reports, utilities descriptions of plants, etc.) was the starting point for the development of ESFAS - Engineered Safety Features and Auxiliary Systems data base, conceived as a tool for the various phases of nuclear plant/system design, up to operational data analysis

  10. The construction of a PWR power station reactor building liner

    International Nuclear Information System (INIS)

    Skirving, N.; Goulding, J.S.; Gibson, J.A.

    1991-01-01

    Cleveland Bridge and Engineering Co Ltd (CBE) are constructing the Reactor Building Liner Plate containment of the Sizewell 'B' Power Station for Nuclear Electric Ltd. This has entailed extensive offsite prefabrication of components and their subsequent erection at Sizewell. It has been necessary to engineer temporary supporting mechanisms to enable manufacture and erection to proceed, yet also to withstand wet concrete forces during the progressive construction. The Reactor Building Liner Plate is a safety related system and as such, in addition to strict compliance with the ASME code, the Quality Assurance (QA) requirements of BS 5882 are applicable. A dedicated Project Team was established by CBE to control and direct the work. Equally important as satisfying the rigorous Q.A. requirements has been the need to meet programme and budget. This paper details CBE execution of the Project. (author)

  11. Recommendations for the market introduction of solar thermal power stations

    International Nuclear Information System (INIS)

    Trieb, F.; Nitsch, J.

    1998-01-01

    Until 2010, solar thermal power stations based on parabolic trough concentrating collectors can become a competitive option on the world's electricity market, if the market extension of this mature technology is supported by a concerted, long-term programme capable of bundling the forces of industry, finance, insurance and politics. Technical improvements based on the experience of over ten years of successful operation, series production and economies of scale will lead to a further cost reduction of 50% and to electricity costs of 0.06 - 0.04 US$/kWh for hybrid steam cycles and hybrid combined cycles, respectively. Until 2010, a capacity of 7 GW will be installed, avoiding 16 million tons of carbon dioxide per year. The programme comprises an investment of 16 billion US$ and requires external funding of 6%. (author)

  12. Solid radioactive waste management in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Huang Laixi; He Wenxin; Chen Degan

    2004-01-01

    This paper introduces the solid radwaste management system, treatment methods and its continuous improvement during the past 9 years in Guangdong Daya Bay Nuclear Power Station (GNPS). GNPS has paid great attention and made a lot of efforts to implement the principle of waste minimization with source control, improvement of treatment process and strict management, so the output of solid radwastes has annually decreased since 1994. In 2002, the output of solid radwastes in GNPS was 63.5 m 3 , only 50% of 1995 (127 m 3 ), reached the advanced level as the same type NPPs in France. During the period 1994-2002, the accumulated production of solid radwaste Packages in GNPS is 1563.51 m 3 only 18% of the design value; all the packages meet the standard and requirement for safe disposal. Besides, this paper analyzes some new technical processes and presents some proposals for further decreasing the solid radwaste production

  13. Benthos of a coastal power station thermal discharge canal

    Energy Technology Data Exchange (ETDEWEB)

    Bamber, R.N.; Spencer, J.F.

    1984-08-01

    Kingsnorth Power Station, on the river Medway Estuary, Kent, discharges cooling water into a canal comprising a 4 km creek system. A comprehensive investigation of the sublittoral benthic fauna of the discharge system was undertaken from January 1979 to September 1981. The macrofauna is significantly suppressed at sites along the discharge canal, representing a community with half the number of species comprising dense populations of a few dominant opportunistic species tolerant of thermal stress (e.g. Tubificoides, Cauleriella) and not those characteristic of organic pollution stress communities. The latter are regular summer immigrants in the creek, but persist only in low numbers if at all in the winter (e.g. Polydora ciliata). This suppression is the result of an approximately 10/sup 0/C temperature front between the heated discharge water and ambient estuarine water, passing over the sea bed with the ebbing and flooding tide four times each day. 39 references, 11 figures, 3 tables.

  14. Safety technology comments on Cattenom nuclear power station

    International Nuclear Information System (INIS)

    1986-01-01

    The comments are based on the safety report for the identical Flamanville plant, on the contract documents for the DUP and on results of consultancy by the DFK Working Party and on replies from the French side in the context of a German list of questions. The comments refer to the state in spring 1982. According to the agreement made for the catalogue of questions Cattenom/KKP 2, the 1300 MW Philippsburg II nuclear power station is used as a German comparable plant in these comments. Reference is made to the German comparable plant in the description and assessment of important parts of the plant. The main points of the safety technology comments are in the assessment of site characteristics; the safety technology concept; the derivation of radio-active materials and the radiation exposure in the adjacent German area. (orig./HP) [de

  15. German risk study on nuclear power stations. Phase B

    International Nuclear Information System (INIS)

    1989-11-01

    The German Risk Study on Nuclear Power Stations is concerned with investigations of accidents in nuclear facilities and their associated risks. These investigations are undertaken on behalf of the federal Minister of Research and Technology. They have been broken down into two phases (Phase A and Phase B). The results of Phase A were published in 1979 (GRS 79). This report contains a summary of the investigations relating to Phase B. After an introduction setting out the basic principles and aim of the study, a general review will be given of the most important results. The course of the investigations and the results have already been published in a Technical Report (GRS 89). (author)

  16. Metal intoxication of atmospheric precipitations near coal power stations

    International Nuclear Information System (INIS)

    Kwapulinski, J.; Zielonka, U.; Kwapulinska, G.; Nowak, B.

    1989-01-01

    Intoxication of atmospheric precipitation near power stations is presented. The migration of some metals in air is described by intoxication coefficient, which in 1981 for Pb changed from 2.25 to 2.96, for Cd from 1.92 to 3.0, for Cu from 2.31 to 4.44, for Fe from 2.78 to 3.95, and for Mn from 1.77 to 3.76. The coefficient value defines potential ecotoxicity of a given metal in the region investigated. Rain or snow intoxication by Pb, Cu, Cd, Fe and Mn, depending o their amount, is described by equation y=ax b . (author). 4 refs, 3 figs, 3 tabs

  17. Energy Sharing Framework for Microgrid-Powered Cellular Base Stations

    KAUST Repository

    Farooq, Muhammad Junaid

    2017-02-07

    Cellular base stations (BSs) are increasingly becoming equipped with renewable energy generators to reduce operational expenditures and carbon footprint of wireless communications. Moreover, advancements in the traditional electricity grid allow two-way power flow and metering that enable the integration of distributed renewable energy generators at BS sites into a microgrid. In this paper, we develop an optimized energy management framework for microgrid-connected cellular BSs that are equipped with renewable energy generators and finite battery storage to minimize energy cost. The BSs share excess renewable energy with others to reduce the dependency on the conventional electricity grid. Three cases are investigated where the renewable energy generation is unknown, perfectly known, and partially known ahead of time. For the partially known case where only the statistics of renewable energy generation are available, stochastic programming is used to achieve a conservative solution. Results show the time varying energy management behaviour of the BSs and the effect of energy sharing between them.

  18. Plastic solidification system at Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Okajima, Hiroyuki; Iokibe, Hiroyuki; Tsukiyama, Shigeru; Suzuki, Michio; Yamaguchi, Masato

    1987-01-01

    In Unit 1 and 2 of the Hamaoka Nuclear Power Station, radioactive waste was previously solidified in cement. By this method, the quantity of waste thus treated is relatively small, resulting in large number of the solidified drums. In order to solve this problem, the solidification facility using a thermosetting resin was employed, which is in operation since January 1986 for Unit 1, 2 and 3. As compared with the cement solidification, the solidified volume of concentrated liquid is about 1/12 and of spent-resin slurry is about 1/4 in plastic solidification. The following are described: course leading to the employment, the plastic solidification facility, features of the facility, operation results so far with the facility, etc. (Mori, K.)

  19. Biological reduction of dust nuisance on power station waste dumps

    Energy Technology Data Exchange (ETDEWEB)

    Kozel, J

    1978-01-01

    The results of pot trials and succeeding field trials carried out in 1966-72 to find out the best method of reclamationand stabilishing the fly ash and cinder waste dump at the Melnik power station are summarised. The material consists mainly of fine particles with a size range of less than 1 micron to 0.16 mm in diam., and creates a source of blown dust in dry weather. Treatment of the waste material before sowing grass and legume species, the species tested, sowing rates, applied fertilizers, irrigation and treatment of the resulting swards are discussed. The most suitable species were Festuca rubra, F. ovina, perennial ryegrass and Italian ryegrass; the cost of stabilising the dump was lowest with Italian ryegrass. (In English)

  20. The Chooz power station: ten years of operation

    International Nuclear Information System (INIS)

    Teste du Bailler, Andre

    1977-01-01

    The switching into actual service of the Chooz plant, the first pressurized water reactor ever built in France, occurred on 3rd april 1967. Ten years later, one can establish a highly positive balance schedule of plant's operation whose availability is satisfactory, except the mechanical failure which occurred during the startup. The behavior of the equipment, in particular of the components of the primary loop, was satisfactory in its whole since it allowed the gradual increase in capacity by 15% with respect to the initial design. It allowed also the achievment of noticeable progress in the design of equipment intended for the new power stations. Interesting results have also been obtained in radioprotection, working conditions of the staff and environment protection fields. Finally, the training of the operating teams has been closely followed, whether it concerned the operators directly affected by plant operation or the trainees gathered in a school specially organized for this purpose and transferred since to a training Center [fr

  1. Technical evaluation of bids for nuclear power stations

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1976-01-01

    A bid evaluation method is described which, it is claimed, facilitates a distinct and objective judgement of bids, taking into account the importance of the components, systems, and technical aspects evaluated with regard to the operation and safety of a nuclear power station. The evaluation basically consists of a cost assessment of the scope of supply deviations and a numerical evaluation of the technical design, the latter being a particularly novel feature of the method. The logic applied in both processes is shown. Main evaluation criteria which are applied for most components and systems are given as reliability, function and performance, safety, operation and maintenance, and materials. The judgements given to these evaluation criteria form the basis of the numerical bid evaluation described, which is carried out with the aid of computer programs. (U.K.)

  2. CEZ considering building a power station in Slovakia

    International Nuclear Information System (INIS)

    Janoska, J.

    2004-01-01

    General Manager of Czech concern CEZ, Martin Roman expecting that his company would probably not succeed in tender for Slovenske elektrarne (SE) shares said for BBC that CEZ was considering the possibility of building a thermal power station in Slovakia that would use Polish coal. He made this statement in a time when an approval by the Slovak cabinet was the only missing step to complete the approval process of contractual documentation related to privatization of SE through Italian Enel. The cabinet only discusses the issue on Wednesday as Slovak Minister of Finance raised objections to its contents. Ivan Miklos asked for guarantees that the state would not be responsible for any future risks resulting from long term contracts concluded by SE

  3. Accounting and cost control of a nuclear power station

    International Nuclear Information System (INIS)

    Dangelmaier, P.

    1977-01-01

    1) chart or classification of accounts, 2) all plant expenses, 3) cost control, 4) storage of spare parts and supplies, 5) control of applicable dose rate, 6) charges for insurance. The accuracy of accounting and cost control is a primary thing for the efficiency in a nuclear power station. The much more important factor is the availability. It is necessary to save costs by a more effective storage or a more detailed and automatic process of single jobs in the workshop. But a very definite experience made in Obrigheim is the fact that not only commercial people know which financial loss will occur if the plant is out of operation one hour. This knowledge is also important for the technical people and for the workers in the workshops. The technical responsibility and the security in operation of the plant and the commercial understanding for the risk of non-availability do not exclude each other. (HP) [de

  4. Oily wastewater treatment at Khartoum North Power Station

    International Nuclear Information System (INIS)

    Eltahir, M. M.; Taha, T. S.

    2009-01-01

    To a chief these goals a series of experimental procedure have been executed for the wastewater in sump tank at river side where all wastewater collected. This paper attempts to investigate the chemical and physical characteristics of Khartoum North Power Station waste water and to suggest methods for removing oil before being discharged to River Bule Nile. To achieve this goal numerous numbers of samples have been collected and examined to detect oil content, turbidity, suspended solids, total dissolved solids, pH, BOD, COD and conductivity, and average values of these parameters were 924.3 ppm, 554.2 NTU, 80 ppm, 559.5 ppm, 7.3 pH unit, 130 Pm, 443.14 ppm, 736.7 μs/cm respectively. The average values of these results were compared with [1] guide lines which are 15 ppm, 5 ppm, 60 ppm, <1000 ppm, 7.5 pH unit, 60 ppm, 100 ppm 500 μs/cm respectively. The outcome of the paper confirmed that waste water at Khartoum North Power Station (KNPS) is heavily polluted with oil and other pollutants. For this reason a second phase of experiments is carried out mainly to remove or reduce oil content to 6.7 ppm and other pollutants to levels which may comply with International Regulations and Local Authority acts. The treatment phase of experiment comprising different processing units arranged in a logical sequence starting with units for oil removal through a coagulation process, NaoH ending with air floatation and skimping to reduce oil content. Results obtained from second phase of experiments after waste water being treated are encouraging and a total reduction in contamination of not less than 80% has been achieved. (Author)

  5. Radioactive waste management at Narora atomic power station in India

    International Nuclear Information System (INIS)

    Prasad, P.N.; Gupta, J.P.; Mittal, S.

    2001-01-01

    Modern society creates waste material, which have to be disposed of in nature without disturbing the ecological equilibrium. Hence effective waste management in all industries is a major concern today. Narora Atomic Power Station (NAPS) generates low and intermediate level liquid, solid and gaseous wastes during its operation and maintenance. The generation of wastes is controlled at the source itself. The wastes are managed by adequate and appropriate treatment before being released into the environment. Different types of liquid wastes are treated by chemical co-precipitation, ion exchange, evaporation, filtration, and dilution techniques. For handling and conditioning of solid wastes, volume reduction techniques such as incineration and baling are employed. The treated wastes are immobilised by incorporation into cement and polymer matrices. Gaseous waste is cleaned by passing through pre-filters and high efficiency particulate (HEPA) filters and diluted with inactive air prior to release to the atmosphere through a 145 m high stack to get further atmospheric dilution. Regular monitoring up to 30 km radius is carried out by fully equipped Environmental Survey and Micrometeorological Laboratory which functions independently under the Directorate of Health and Safety, Bhabha Atomic Research Centre (BARC), Mumbai. So far, the annual maximum dose to the public around NAPS is reported to be 0.2 to 0.3% of limit of 1 mSv/year recommended by the International Commission on Radiological Protection (ICRP). A decade of experience has proved that present practices of nuclear waste management at Narora Atomic Power Station are quite safe and effective with respect to ecological equilibrium. (author)

  6. Measurement uncertainty recapture (MUR) power uprates operation at Kuosheng Nuclear Power Station

    International Nuclear Information System (INIS)

    Chang Chinjang; Wang Tunglu; Lin Chihpao

    2009-01-01

    Measurement Uncertainty Recapture PowerUprates (MUR PU) are achieved through the use of state-of-the-art feedwater flow measurement devices, i.e., ultrasonic flow meters (UFMs), that reduce the degree of uncertainty associated with feedwater flow measurement and in turn provide for a more accurate calculation of thermal power. The Institute of Nuclear Energy Research (INER) teamed with Sargent and Lundy, LLC (S and L), Pacific Engineers and Constructors, Ltd (PECL), and AREVA to develop a program and plan for the Kuosheng Nuclear Power Station (KNPS) MUR PU Engineering Service Project and for the assistance to Kuosheng MUR PU operation. After regulator's approval of the licensing requests, KSNPS conducted the power ascension test and switchover to the new rated thermal power for Unit 2 and Unit 1 on 7/7/2007 and 11/30/2007, respectively. From then on, KNPS became the first nuclear power plant implementing MUR PU operation in Taiwan and in Asia. (author)

  7. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  8. Complementary safety evaluation of the Phenix power station (INB n 71) in the light of the Fukushima power station accident

    International Nuclear Information System (INIS)

    2011-01-01

    This report proposes a complementary safety evaluation of the Phenix power station, one of the French basic nuclear installations (BNI, in French INB) in the light of the Fukushima accident. This evaluation takes the following risks into account: risks of flooding, earthquake, loss of power supply and loss of cooling, in addition to operational management of accident situations. It presents some characteristics of the Phenix installation (location, operator, industrial environment, installation characteristics), identifies the risks of cliff effect and the main structures and equipment, evaluates the seismic risk (installation sizing, installation conformity, margin evaluation), evaluates the flooding risk (installation sizing, installation conformity, margin evaluation), briefly examines other extreme natural phenomena (extreme meteorological conditions related to flooding, earthquake or flooding with a higher level than that for which the installation is designed). It analyzes the risk of a loss of power supply and of cooling (loss of external and internal electric sources, loss of the ultimate cooling system). It analyzes the management of severe accidents: crisis management organization, available intervention means, robustness of available means. It discusses the conditions of the use of subcontractors

  9. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  10. Challenges to fire protection measures at Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Narama, Takeshi

    2015-01-01

    New regulatory standards for fire protection at nuclear power plants have been established by the Nuclear Regulation Authority. This paper introduces the measures taken by the Hamaoka Nuclear Power Station for the following four items, which were especially big changes. (1) To install a combination of sensors of different types or instruments with equivalent functions so as to be able to emit unique signals to inform a fire in the early stage. (2) To conduct 'UL vertical burn test' as the demonstration test for self-extinguishing performance as the condition for flame-retardant cable. (3) To install automatic fire-extinguishers or fixed fire-extinguishing devices of manual type at the spots where fire-fighting is difficult due to the filling of smoke in a fire or the effect of radiation. (4) To separate the system for purpose of ensuring safety function to attain the high-temperature shutdown and cold-temperature shutdown of a reactor whatever fire may happen at the nuclear facilities. The examples of the installation of fire-extinguishers as the measures for the above Item (3) are as follows; (A) as for the devices containing oil, a foam-extinguishing agent is released against each target device from the nozzle, and (B) for large vertical pump motors indoors and relatively small pump motors, IA type automatic foam extinguishing systems are installed. (A.O.)

  11. Microwave energy transmission system for solar power station

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi

    1988-05-05

    This paper deals with a microwave wireless energy transmission system which will be required for a solar power station under investigation, particularly, it describes its foundation and future investigation. It is supposed that for realization of microwave wireless transmission techniques, it is most important to investigate the effect of strong microwave beams on a plasma environment, establish control techniques for microwave beams in which a retro-directive system is combined with a computer control system, and develop a semiconductor transmission module. Institute of Space and Astronautical Science (Japan) made an experiment on the effect of microwaves on ionospheric plasma by using an observatory rocket. The institute has planned to make an experiment on a microwave energy transmission system which is to be mounted to a small-scale space flyer unit in order to examine the control of microwave beams and 10 KW power transmission, in addition to investigation on the interaction of microwave energy beams with a plasma environment. (4 figs, 3 tabs, 20 refs)

  12. Carbon burnout of pulverised coal in power station furnaces

    Energy Technology Data Exchange (ETDEWEB)

    R.I. Backreedy; L.M. Fletcher; J.M. Jones; L. Ma; M. Pourkashanian; A. Williams; K. Johnson; D.J. Waldron; P. Stephenson [University of Leeds, Leeds (United Kingdom)

    2003-07-01

    The degree of carbon burnout in pulverised fuel fired power stations is important because it is linked with power plant efficiency and coal ash suitability for construction purposes. The use of computational methods to calculate carbon burnout in such systems has been aided by the increasing availability of fast computers and improvements in computational methodologies. Despite recent advances in fluid flow, coal devolatilisation and coal combustion models, the use of CFD methods for detailed design purposes or for the selection of commercial coals is still limited. In parallel, industrial engineering codes, which combine simplified thermal models with advanced coal combustion models, are still undergoing development since they provide economic advantages over detailed CFD analysis. Although the major coal combustion processes are well established, an understanding regarding the role of coal macerals and the influence of ash on the combustion process is still lacking. A successful coal model must be able to handle all the complexities of combustion, from the details of the burner geometry through to the formation of unburnt carbon as well as NOx. The development of such a model is described here.

  13. 76 FR 11680 - Digital Low Power Television, Television Translator, and Television Booster Stations and Digital...

    Science.gov (United States)

    2011-03-03

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and Digital Class A... Commission's Rules to Establish Rules for Digital Low Power, Television Translator, and Television Booster... Digital Low Power Television Translator, Television Booster Stations, and to Amend Rules for Digital Class...

  14. Organization of the operating quality in EDF nuclear power stations

    International Nuclear Information System (INIS)

    Stolz, J.

    1976-01-01

    The organization of operating quality in EDF nuclear stations cover a number of planned and systematic actions of technical and management order carried on at station level and Nuclear Safety Department level. Priority is given to safety quality which has to remain the same during the whole life of the stations; the safety of a station depending from its designing, realization and starting up quality on one hand and from its operating methods on the other [fr

  15. Condensate demineralizer system for Fukushima Daiichi Nuclear Power Station, the Tokyo Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ariyoshi, Shigeki; Ikeda, Yukio; Kuramoto, Kenji; Omori, Yoshi; Yamamoto, Hiroyoshi

    1975-01-01

    This paper describes the condensate demineralizing equipment recently supplied to the second, third, and fifth power units of the Fukushima Daiichi Nuclear Power Station of the Tokyo Electric Power Company, Inc. The output of this equipment is rated as 4,900 m 3 /h each, which is currently the largest capacity for this type of equipment in Japan. The purpose of this equipment is to remove any ion components and suspended solids contained in condensate to improve its water purity. By doing so, decreasing the corrosion rate of materials used in the plant and, at the same time, decreasing the radioactivity of the condensate, thus easing the whole plant operation can be achieved. The same kind of equipment is also employed at the conventional thermal power stations, but the required functioning and operating mode are quite different. In the case of the nuclear power plant, extremely severe requirements specific with nuclear technology must be met which arise solely from dealing with radioactive substances. Not only the water treatment method, but also layout and arrangement, operation and liquid waste processing methods differ from those for the conventional power plants. The equipment for the sixth unit at Fukushima is now under designing and that for the Tokai No.2 unit of the Japan Atomic Power Company is already under shop fabrication. Both have the rated capacity of 7,300 m 3 /h each, which exceeds far up the capacity of the previously mentioned equipment. (auth.)

  16. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  17. A survey on the history of developing nuclear power station in Hunan Province

    International Nuclear Information System (INIS)

    Ren Dexi

    1993-01-01

    Sixteen years ago it was suggested that a nuclear power station should be built in Hunan Province, and a special document was reported to the State Council. Up to now, the idea has still been under consideration. The author discusses the development of nuclear power station in Hunan province. It mainly consists of four parts: the history, the necessity the barriers met in the course and the feasible way of developing nuclear power station in Hunan Province

  18. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Wilson, A.

    1982-11-01

    The methods of establishing construction time, capital cost, availability and lifetime of different types of generating plant are described. In volume one assessments are presented for a new coal fired station, for a new AGR station and for a new PWR station - Sizewell B. Volume two, contains all diagrams, tables and appendices presented as evidence. (U.K.)

  19. Functioning of police in Volgograd oblast in the estimations of the public

    Directory of Open Access Journals (Sweden)

    Anna P. Alekseyeva

    2015-12-01

    Full Text Available Objective to determine the reliability and objectivity of information to the population on the functioning of police in Volgograd oblast. Methods sociological absentee polling in the form of a questionnaire statistical logical documentary graphic method of systemic analysis. Results the opinions of the population on police are extremely controversial. It is connected mostly with the sources of information which mostly are not reliable and objective. The article shows that despite the growth of victimization the level of anxiety of the population about the criminal attacks is gradually reduced and the sense of security in citizens is strengthened though often due to their personal efforts to protect their life health and property. Only every fifth citizen relies on the participation of law enforcers in ensuring security and public order. The survey revealed that about half of the citizens who are potentially interested in the reaction of law enforcement officers to the crime actually agree to leave the offender unpunished due to the mistrust of the police. A third of claimants were unsatisfied with the police action on their application which does not correlate with the declared numbers. The opinion of Volgograd citizens on the frequency of bribery among police officers remains unchanged whereas other malfeasances received a significant increase. And despite this the attitude of the respondents towards the police in general has improved. Mostly it was the result of media activities that inform the public about successful police work using TV shows documentaries and feature films. The successful work of the police is also confirmed by statistic that shows the rapid decline in recorded crime. Scientific novelty for the first time on the basis of a combination of various methods the reliability and objectivity of information to the population is investigated on the police of Volgograd oblast. Practical significance the main provisions and

  20. Study of wet blasting of components in nuclear power stations

    International Nuclear Information System (INIS)

    Hall, J.

    1999-12-01

    This report looks at the method of wet blasting radioactive components in nuclear power stations. The wet blaster uses pearl shaped glass beads with the dimensions of 150-250 μm mixed with water as blasting media. The improved design, providing outer operator's positions with proper radiation protection and more efficient blasting equipment has resulted in a lesser dose taken by the operators. The main reason to decontaminate components in nuclear power plants is to enable service on these components. On components like valves, pump shafts, pipes etc. oxides form and bind radiation. These components are normally situated at some distance from the reactor core and will mainly suffer from radiation from so called activation products. When a component is to be decontaminated it can be decontaminated to a radioactive level where it will be declassified. This report has found levels ranging from 150-1000 Bq/kg allowing declassification of radioactive materials. This difference is found between different countries and different organisations. The report also looks at the levels of waste generated using wet blasting. This is done by tracking the contamination to determine where it collects. It is either collected in the water treatment plant or collected in the blasting media. At Barsebaeck the waste levels, from de-contaminating nearly 800 components in one year, results in a waste volume of about 0,250 m 3 . This waste consists of low and medium level waste and will cost about 3 600 EURO to store. The conclusions of the report are that wet blasting is an indispensable way to treat contaminated components in modern nuclear power plants. The wet blasting equipment can be improved by using a robot enabling the operators to remotely treat components from the outer operator's positions. There they will benefit from better radiation protection thus further reduce their taken dose. The wet blasting equipment could also be used to better control the levels of radioactivity on

  1. Quality control of Ling'ao nuclear power station civil construction

    International Nuclear Information System (INIS)

    Lu Buliang; Ye Changyuan

    2001-01-01

    Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the author briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non-conformance control of civil works. These quality control processes described come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience

  2. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  3. DC-DC power converter research for Orbiter/Station power exchange

    Science.gov (United States)

    Ehsani, M.

    1993-01-01

    This project was to produce innovative DC-DC power converter concepts which are appropriate for the power exchange between the Orbiter and the Space Station Freedom (SSF). The new converters must interface three regulated power buses on SSF, which are at different voltages, with three fuel cell power buses on the Orbiter which can be at different voltages and should be tracked independently. Power exchange is to be bi-directional between the SSF and the Orbiter. The new converters must satisfy the above operational requirements with better weight, volume, efficiency, and reliability than is available from the present conventional technology. Two families of zero current DC-DC converters were developed and successfully adapted to this application. Most of the converters developed are new and are presented.

  4. Situation and future developments in the power station engineering of the GDR

    International Nuclear Information System (INIS)

    Effenberger, H.; Weidlich, H.G.

    1990-01-01

    Starting with the present state of power stations in the GDR and their evaluation in respect of energy and ecology, the authors have developed a concept for the future objectives and possibilities of the power stations. With regard to the modification of the power station engineering, considered as urgently required due to reasons of energy and environment, there was suggestions for modern plant conceptions, such as fluidized bed combustors, combined and gas/steam power plants, besides the retrofitting and the new building of proven conventional plants. It includes also the extension of combined heat and power systems, of nuclear energy, and the use of regenerative energy sources as parts of this concept. The power station modifications intended are shown in tables for the various power station locations. (orig.) [de

  5. Analysis of time series exposure rates obtained at a monitoring station around nuclear power stations

    International Nuclear Information System (INIS)

    Urabe, I.; Ogawa, Y.; Kimura, Y.; Honda, Y.; Nakashima, Y.; Yoshimoto, T.; Tsujimoto, T.

    1991-01-01

    From the investigation on the variation of AAD rates monitored in the natural environment around nuclear power station, it may be concluded; (1) Differences between monthly averaged air absorbed dose rates (AAD rates) given by all data obtained and those obtained in fine weather become larger in winter (from Dec. to Feb.) (2) Cummulative frequency distributions of AAD rates are very different among four seasons. Remarkably high AAD rates are observed by heavy rains in summer and snow falls or rains in winter. (3) Though the hypothesis that the frequency distribution of AAD rates fit to the lognormal distribution can not be accepted by chi-square test, higher part of the frequency distribution of AAD rates agree approximately with the lognormal one. (4) Identification of AAD rates due to plume exposure may be possible by statistical analysis assuming lognormal distribution of AAD rates as well as the discrimination method based on the reference standard using mean values and standard deviations of the data obtained in fine weather. (author)

  6. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    power density of 41 MW(th)t U. The expected average fuel burnup and core life are 25 000 MWd/t U and 620 equivalent full-power days, respectively. These characteristics have been achieved without taking advantage of various improvements - such as the possibility of flattening the power distribution in the core by the use of two or more fuel enrichments - which are planned for more advanced Vulcain cores. The successful construction and operation of BR3/Vulcain will have demonstrated that components and techniques are available to build and operate simple, compact reactors in the small to medium power range, using long-life, high-power density cores and variable moderation. From the analyses carried out so far this concept competes well with other reactor concepts, while market surveys have indicated that there is a world market for small to medium power stations at prices within reach of those currently mentioned for the Vulcain design. (author)

  7. Measurements and modelling of base station power consumption under real traffic loads.

    Science.gov (United States)

    Lorincz, Josip; Garma, Tonko; Petrovic, Goran

    2012-01-01

    Base stations represent the main contributor to the energy consumption of a mobile cellular network. Since traffic load in mobile networks significantly varies during a working or weekend day, it is important to quantify the influence of these variations on the base station power consumption. Therefore, this paper investigates changes in the instantaneous power consumption of GSM (Global System for Mobile Communications) and UMTS (Universal Mobile Telecommunications System) base stations according to their respective traffic load. The real data in terms of the power consumption and traffic load have been obtained from continuous measurements performed on a fully operated base station site. Measurements show the existence of a direct relationship between base station traffic load and power consumption. According to this relationship, we develop a linear power consumption model for base stations of both technologies. This paper also gives an overview of the most important concepts which are being proposed to make cellular networks more energy-efficient.

  8. Measurements and Modelling of Base Station Power Consumption under Real Traffic Loads

    Directory of Open Access Journals (Sweden)

    Goran Petrovic

    2012-03-01

    Full Text Available Base stations represent the main contributor to the energy consumption of a mobile cellular network. Since traffic load in mobile networks significantly varies during a working or weekend day, it is important to quantify the influence of these variations on the base station power consumption. Therefore, this paper investigates changes in the instantaneous power consumption of GSM (Global System for Mobile Communications and UMTS (Universal Mobile Telecommunications System base stations according to their respective traffic load. The real data in terms of the power consumption and traffic load have been obtained from continuous measurements performed on a fully operated base station site. Measurements show the existence of a direct relationship between base station traffic load and power consumption. According to this relationship, we develop a linear power consumption model for base stations of both technologies. This paper also gives an overview of the most important concepts which are being proposed to make cellular networks more energy-efficient.

  9. Manufacture and quality control of concrete for Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Tada, Akiomi; Kitada, Takao

    1989-01-01

    Ikata Nuclear Power Station, only one nuclear power station in Shikoku, is located at the root of Sada Peninsula on Seto Inland sea side. At present, No.1 and No.2 plants of 566 MW each are in commercial operation, and on the east side, No.3 plant is under construction. No.3 plant is a PWR type plant of 890 MWe output, and the start of commercial operation is scheduled in March, 1995. In the construction of No.3 plant, the concrete used for civil engineering and building works is about 430,000 m 3 , and for the improvement of the quality control of concrete, the pursuit of economic efficiency, the fostering of concrete technology of employee and the coprosperity with local industries, the facilities for manufacturing concrete were constructed within the premise of the power station. The amount of use of concrete and respective materials classified by respective fiscal years, and the amount of manufacture of concrete that determines the scale of the concrete plant are shown. As to the construction of the concrete plant, the foundation work was started in March, 1987, and the machine foundation and building works were started in May, 1987. The acceptance was completed on August 17, 1987. The facilities of manufacturing concrete, the manufacture of concrete, and the quality control of materials and concrete are reported. (author)

  10. Radiocarbon mass balance for a Magnox nuclear power station

    International Nuclear Information System (INIS)

    Metcalfe, M.P.; Mills, R.W.

    2015-01-01

    Highlights: • First comprehensive assessment of C-14 arisings in a Magnox nuclear power station. • C-14 production in graphite and coolant gas quantified by activation modelling. • Principal C-14 production pathway is via C-13 with a small contribution from N-14. • C-14 mass balance model provides a basis for analyses on other reactors. - Abstract: Nuclear power generation in the United Kingdom is based principally on graphite-moderated gas-cooled reactors. The mass of irradiated graphite associated with these reactors, including material from associated experimental, prototype and plutonium production reactors, exceeds 96,000 tonnes. One of the principal long-lived radionuclides produced during graphite irradiation is radiocarbon (C-14). Its potential as a hazard must be taken into account in decommissioning and graphite waste management strategies. While C-14 production processes are well-understood, radionuclide distributions and concentrations need to be characterised. A common misconception is that generic statements can be made about C-14 precursors and their location. In fact, the composition of the original manufactured material, the chemical environment of the graphite during service and its irradiation history will all influence C-14 levels. The analysis presented here provides the first assessment of the principal C-14 activation pathways for a UK Magnox reactor. Activation modelling has been used to predict C-14 production rates in both the graphite core and the carbon dioxide coolant over a selected period of operation and the results compared with monitored site C-14 discharges. Principal activation routes have been identified, which should inform future graphite waste management strategies relating to radiocarbon

  11. Lessons learned from our accident at Fukushima nuclear power stations

    International Nuclear Information System (INIS)

    Kawano, A.

    2012-01-01

    This paper is given in order to share the detailed information on the Fukushima Accident which occurred on March 11, 2011, and the lessons learned from it which worldwide nuclear experts might currently have more interest in. The paper first reflects how the facilities were damaged by a very strong earthquake and a series of beyond design-basis tsunamis. The earthquake caused loss of all off-site electric power at Fukushima Daiichi Nuclear Power Station (1F), and the following series of tsunami made all emergency diesel generators except one for Unit 6 and most of DC batteries inoperable and severely damaged most of the facilities located on the ocean side. Thus all the units at 1F resulted in the loss of cooling function and ultimate heat sink for a long time period. TEPCO focused on restoration of the instruments and lights in the Main Control Room (MCR), preparation of alternative water injection and venting of Primary Containment Vessel (PCV) in the recovery process. However, the workers faced a lot of difficulties such as total darkness, repeated aftershocks, high radiation dose, a lot of debris on the ground, loss of communication means, etc. Massive damages by the tsunami and lack of necessary equipments and resources hampered a quick recovery. It eventually resulted in the severe core damage of Unit 1, 2, and 3 and also the hydrogen explosions in the reactor buildings of Unit 1, 3, and 4. This paper finally extracts the lessons learned from the accident and proposes the countermeasures, such as flood protection for essential facilities, preparation of practical and effective tools, securing communication means and so on. These would help the people involved in the nuclear industries all over the world properly understand the accident and develop their own countermeasures appropriately. (authors)

  12. Review on Water Distribution of Cooling Tower in Power Station

    Science.gov (United States)

    Huichao, Zhang; Lei, Fang; Hao, Guang; Ying, Niu

    2018-04-01

    As the energy sources situation is becoming more and more severe, the importance of energy conservation and emissions reduction gets clearer. Since the optimization of water distribution system of cooling tower in power station can save a great amount of energy, the research of water distribution system gets more attention nowadays. This paper summarizes the development process of counter-flow type natural draft wet cooling tower and the water distribution system, and introduces the related domestic and international research situation. Combining the current situation, we come to the conclusion about the advantages and disadvantages of the several major water distribution modes, and analyze the problems of the existing water distribution ways in engineering application, furthermore, we put forward the direction of water distribution mode development on the basis knowledge of water distribution of cooling tower. Due to the water system can hardly be optimized again when it’s built, choosing an appropriate water distribution mode according to actual condition seems to be more significant.

  13. New local diesel power stations: an economic assessment

    International Nuclear Information System (INIS)

    Wills, R.J.; Reuben, B.G.

    1992-01-01

    A recent investigation examined the economic potential for electricity generation in the U.K. using large slow-speed two-stroke diesel engines of around 40MW unit output. Large diesels are a high efficiency technology, resilient to fuel quality, and with high reliability. Economic analysis compared diesels with other generating options for a range of fuel scenarios and discount rates. Merit order potential and total costs were also assessed. The diesels show superior economic qualities, both in terms of investment criteria and high merit position. They are economically comparable with combined cycle gas turbines, but combined cycle plant is essentially large-scale, whereas diesels in 40 MW units sizes can provide small-scale, high-efficiency local generation. Slow-speed diesels represent a sound investment for electricity supply. Diesels in local power stations in southern England would increase supply security and diversity. They are compatible with a cautious investment approach and are appropriate for the new market conditions in electricity supply. (author)

  14. Crud separation from equipment drain of BWR atomic power station

    International Nuclear Information System (INIS)

    Hayashi, Masaru; Yamaguchi, Hisashi; Moriya, Yasuhiro; Koshiba, Yukihiko; Ota, Yoshiharu.

    1977-01-01

    In the primary cooling systems of BWR nuclear power stations, radioactive crud is generated and accumulates in reactors and circulating systems, which causes the radiation exposure of workers at the time of the inspection and maintenance of reactors. The chemical composition and grain size distribution of crud differ largely according to the construction of primary systems, the operational conditions of reactors, and the process of operation. The study on the application of nuclear pore membrane filter NPMF to the separation of crud in the waste water from equipment drain systems has been carried out. With the NPMF, clarified filtrate can be obtained without any filter aid, therefore the secondary waste of filter sludge is not generated. When the filter is clogged, the filtration capability can be regenerated by reverse flow washing, and continuous filtration is possible actually because the regeneration takes only short time. The NPMF is the polycarbonate membrane of about 10 μm thick, to which charged particles are irradiated vertically, and the flight tracks are etched with alkali solution, thus the required pore treatment is applied. The basic investigation of waste liquid, the endurance test of actual filters, the filtration test with the pilot apparatus, the demonstration test with an actual equipment, and the design of the actual equipment have been carried out for three years. (Kako, I.)

  15. Development of non-halogen cables for nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Yagyu, Hideki; Yamamoto, Yasuaki; Onishi, Takao (Hitachi Cable, Ltd., Tokyo (Japan))

    1983-12-01

    The non-halogen fire-resistant cables for nuclear power stations which never generate halogen gas, have been developed. The cables comprise the insulator of EP rubber and the sheath of polyolefine containing non-halogen inorganic fire-retardant. The results of the environmental test and fire-resistance test are described. In the environmental test, the cables were subjected to the heating, gamma-irradiation and steam exposure successively, according to IEEE specification 323,383, and subsequently the change in the appearance, tensile strength and electrical performance of the cables was measured. In the fire-resistance test, the vertical tray fire test according to the IEEE specification 383 was adopted, and other tests including the vertical fire test on insulator cores, oxygen index, the generation of corrosive gas, copper mirror corrosion test, gas toxicity test and optical smoke density test were carried out. It became clear that the cables did not generate halogen gas on burning, and brought about reduced toxicity, corrosion and smoke, and that the safety against fire is greatly improved by using the cables.

  16. Way to LWR nuclear power stations taking root

    International Nuclear Information System (INIS)

    Toyota, Masatoshi

    1994-01-01

    In this report, as for BWR nuclear power stations, the countermeasures to initial troubles, the circumstances of making bold start for the improvement and standardization after the remarkable lowering of the rate of operation, the development of A-BWR aiming at the most excellent BWR plant and the effort to reduce the construction cost are looked back, and the opinion on advancing nuclear energy development hereafter is mentioned. As the initial troubles, the thermal fatigue of reactor feedwater nozzles, the cracking of return water nozzles in control rod drive, the damage of fuel elements and others occurred. The circumstances till starting the project of improvement and standardization, and the investigation by the ad hoc committee and the results are reported. The feasibility study on A-BWR was carried out from July, 1978 to October, 1979. The basic design and the research and development for verification and the optimization design were carried out till December, 1985, as the result, the improvement of the plant performance was obtained. The effort for reducing the construction cost was successful. (K.I.)

  17. Multivariable control in nuclear power stations -survey of design methods

    International Nuclear Information System (INIS)

    Mcmorran, P.D.

    1979-12-01

    The development of larger nuclear generating stations increases the importance of dynamic interaction between controllers, because each control action may affect several plant outputs. Multivariable control provides the techniques to design controllers which perform well under these conditions. This report is a foundation for further work on the application of multivariable control in AECL. It covers the requirements of control and the fundamental mathematics used, then reviews the most important linear methods, based on both state-space and frequency-response concepts. State-space methods are derived from analysis of the system differential equations, while frequency-response methods use the input-output transfer function. State-space methods covered include linear-quadratic optimal control, pole shifting, and the theory of state observers and estimators. Frequency-response methods include the inverse Nyquist array method, and classical non-interactive techniques. Transfer-function methods are particularly emphasized since they can incorporate ill-defined design criteria. The underlying concepts, and the application strengths and weaknesses of each design method are presented. A review of significant applications is also given. It is concluded that the inverse Nyquist array method, a frequency-response technique based on inverse transfer-function matrices, is preferred for the design of multivariable controllers for nuclear power plants. This method may be supplemented by information obtained from a modal analysis of the plant model. (auth)

  18. Adaptive Modeling of the International Space Station Electrical Power System

    Science.gov (United States)

    Thomas, Justin Ray

    2007-01-01

    Software simulations provide NASA engineers the ability to experiment with spacecraft systems in a computer-imitated environment. Engineers currently develop software models that encapsulate spacecraft system behavior. These models can be inaccurate due to invalid assumptions, erroneous operation, or system evolution. Increasing accuracy requires manual calibration and domain-specific knowledge. This thesis presents a method for automatically learning system models without any assumptions regarding system behavior. Data stream mining techniques are applied to learn models for critical portions of the International Space Station (ISS) Electrical Power System (EPS). We also explore a knowledge fusion approach that uses traditional engineered EPS models to supplement the learned models. We observed that these engineered EPS models provide useful background knowledge to reduce predictive error spikes when confronted with making predictions in situations that are quite different from the training scenarios used when learning the model. Evaluations using ISS sensor data and existing EPS models demonstrate the success of the adaptive approach. Our experimental results show that adaptive modeling provides reductions in model error anywhere from 80% to 96% over these existing models. Final discussions include impending use of adaptive modeling technology for ISS mission operations and the need for adaptive modeling in future NASA lunar and Martian exploration.

  19. Monitoring of atmospheric 3H around Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Gautam, Y.P.; Sharma, A.K.; Sharma, S.; Rao, K.S.; Kumar, J.; Kumar, V.; Singh, B.; Kumar, A.; Hedge, A.G.

    2010-01-01

    Atmospheric tritium activity is measured regularly around Narora Atomic Power Station (NAPS) since gaseous waste, which contains tritium, is being released through a 145 m high stack at NAPS site. Atmospheric data collected during 2004-2008 shows a large variation of 3 H concentration in air, fluctuating in the range of ≤0.2-91.6 Bq m -3 . Significantly, higher tritium levels were measured in samples near the site boundary (1.6 km) of NAPS compared to off-site locations. The atmospheric dilution factor was found to be in the range of 1.1 x 10 -7 -7.3 x 10 -7 s m -3 . The scavenging ratio of NAPS site was found to be varying from 0.2 x 10 4 to 14.1 x 10 4 (Bq m -3 rain water per Bq m -3 air). The inhalation dose to a member of general public at different distances (1.6-30 km) from NAPS site was found to be ranged from 0.08-0.21 μSv year -1 . (author)

  20. Development of non-halogen cables for nuclear power stations

    International Nuclear Information System (INIS)

    Yagyu, Hideki; Yamamoto, Yasuaki; Onishi, Takao

    1983-01-01

    The non-halogen fire-resistant cables for nuclear power stations which never generate halogen gas, have been developed. The cables comprise the insulator of EP rubber and the sheath of polyolefine containing non-halogen inorganic fire-retardant. The results of the environmental test and fire-resistance test are described. In the environmental test, the cables were subjected to the heating, gamma-irradiation and steam exposure successively, according to IEEE specification 323,383, and subsequently the change in the appearance, tensile strength and electrical performance of the cables was measured. In the fire-resistance test, the vertical tray fire test according to the IEEE specification 383 was adopted, and other tests including the vertical fire test on insulator cores, oxygen index, the generation of corrosive gas, copper mirror corrosion test, gas toxicity test and optical smoke density test were carried out. It became clear that the cables did not generate halogen gas on burning, and brought about reduced toxicity, corrosion and smoke, and that the safety against fire is greatly improved by using the cables. (Yoshitake, I.)

  1. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  2. Lessons drawn from serious accidents in nuclear power stations

    International Nuclear Information System (INIS)

    Kosciusko-Morizet, F.; Tanguy, P.

    1981-01-01

    Taking a number of serious accidents considered to be particularly representative (Windscale, Enrico Fermi, Lucens, Browns Ferry, Three Mile Island and Saint-Laurent-des-Eaux), the paper analyses the conclusions reached in subsequent enquiries and the lessons drawn from them by the responsible authorities. While design problems sometimes come to light, it is much more generally operational safety - problems related to instructions, the training of operators, the man/machine relationship - which appears to be inadequate. The organization of relations between the different partners - builders, operators and safety bodies - likewise gives rise to some observations. Certain measures should be pursued on a broader scale in order to improve our ability to prevent serious accidents: (i) incidents important from the standpoint of safety must be identified; (ii) these incidents must be brought to the knowledge of all partners concerned, in all interested countries; (iii) the lessons drawn from them must be exchanged and compared; and (iv) the lessons must be made generally available in a directly usable form (i.e. as design modifications, changes in instructions and so on). Particular attention must be given to the problems of countries which are embarking on nuclear programmes and which, with a small number of installations, need direct and permanent access to all the lessons drawn from the operation of a large power station park, and must be able to call upon the assistance of teams from outside in the event of an accident. (author)

  3. Law concerning water and nuclear power station licensing

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The competent water authority, within the purview of the legal provisions concerning water is entitled to define a maximum of radioactive contamination of cooling water taken from and re-fed into the Rhine river, and is entitled to make such limit form part of the permit granted to a nuclear power station (here: Biblis B reactor). This right is not overruled by sections 45, 46 of the Rad. Protection Ordinance which determine dose limits (among others also for radioactivity released through waste water), and which state the competent licensing authority under atomic energy law to be entitled to set higher or lower limits by discretion. The provisions of sections 45 ff Rad. Prot. Ordinance are to be interpreted to mean that since the competent authority in accordance with section 46, sub-sections (2) and (5) Rad. Prot. Ordinance is given the right to define maximum acceptable radioactivity release through water discharge, it many also define the lowest limit of contamination and is hence entitled to declare discharged cooling water not to fall under atomic energy law, but rather under the law relating to water management. (orig.) [de

  4. Manufacture of power station heat exchangers using modern production technology

    International Nuclear Information System (INIS)

    Genzlinger, W.; Hoffmann, J.; Ohlhaeuser, K.

    1986-01-01

    Heat exchangers of high quality and operational safety can only be fabricated economically if fabrication is as 'simple' as possible and can be controlled and if, through value analysis, the work flows can be mechanized and automated and the following requirements are met: use of materials that are easy to work with for the application considered, choice of product designs and wall thicknesses that offer favourable conditions for processing and non-destructive testing, placing of seams in such a way that good accessibility for welding and minimum residual welding stresses are assured, minimizing the number of welding seams, use of automatic welding machines for submerged-arc welding and electronically controlled sources of welding current - semi-automatic equipment for spatter-free interfaces (pulse technique), electronically controlled equipment for welding in rollers and pipes and CNC-controlled machining centres for drilling pipe galleries (deep-hole drilling) and baffle plates and for machining the sealing elements after welding. Continuous inspections in each phase of fabrication assures that heat exchangers are made which fully meet the requirements of nuclear power station operators. (orig.)

  5. Fire-side corrosion in power-station boilers

    Energy Technology Data Exchange (ETDEWEB)

    Cutler, A J.B.; Flatley, T; Hay, K A

    1978-10-01

    The steel tubing of a modern power-station boiler operates at up to 650/sup 0/C (a dull red heat) in the very corrosive environment produced by the combustion gases and ash particles. Within the tubes, whose walls are around 5mm thick, 2000 tons of steam are generated per hour at temperatures up to 565/sup 0/C and pressures up to 170 bar. Several forms of metal corrosion may occur on the fireside surface of these tubes and on other boiler components. The designed 20-year operating life of the stainless-steel superheater and reheater tubes can be much reduced at temperatures above 600/sup 0/C by attack from molten salts formed beneath the deposited ash on the upstream tube surfaces. Mild steel evaporator tubes lining the furnace wall may suffer similarly if flame impingement allows the local release of volatile chlorine compounds from coal particles on the tube surface. Uncooled metal components supporting and aligning the boiler tubes may reach 1000/sup 0/C and are particularly susceptible to corrosion. CEGB research effort has been applied to quantify the rate of corrosion and to obtain an understanding of the complex corrosion mechanisms, so that ways of minimizing or preventing their occurrence may be found. These include the optimization of the combustion chemistry, design modifications such as shielding certain vulnerable tubes, and the selection of improved alloys and the use of ''co-extruded'' tubing.

  6. The Fukushima Nuclear Power Station incident and marine pollution

    International Nuclear Information System (INIS)

    Chang Yenchiang; Zhao Yue

    2012-01-01

    Based on the facts relating to the radioactive wastewater discharged by the Fukushima Nuclear Power Station in Japan, this paper intends to explore the international legal obligations for Japan from three perspectives, namely, the immediate notification, the prevention of transboundary harm and the prevention of dumping. Furthermore, this article defines and compares two types of international legal liabilities, the traditional state responsibility and the responsibility for transboundary harm. Through comparison, the international legal liability of Japan is discussed. After detailed analysis, the conclusion is that Japan should be responsible for the obligation of immediate notification and since Japan unilaterally discharge the wastes without prior specific permits of other contracting countries, it should also be responsible for the violation of prevention of dumping. Since so far, no material injury has emerged and there would appear to be no culpability as regards the prevention of transboundary harm. Finally, this paper stresses the necessity to develop a worldwide agreement concerning the liability for transboundary harm and to establish an institutional framework for the enforcement of a state’s obligations, and also the great significance of international cooperation between nations and organisations in relation to marine environmental protection.

  7. Two phase flow problems in power station boilers

    International Nuclear Information System (INIS)

    Firman, E.C.

    1974-01-01

    The paper outlines some of the waterside thermal and hydrodynamic phenomena relating to design and operation of large boilers in central power stations. The associated programme of work is described with an outline of some results already obtained. By way of introduction, the principal features of conventional and nuclear drum boilers and once-through nuclear heat exchangers are described in so far as they pertain to this area of work. This is followed by discussion of the relevant physical phenomena and problems which arise. For example, the problem of steam entrainment from the drum into the tubes connecting it to the furnace wall tubes is related to its effects on circulation and possible mechanisms of tube failure. Other problems concern the transient associated with start-up or low load operation of plant. The requirement for improved mathematical representation of steady and dynamic performance is mentioned together with the corresponding need for data on heat transfer, pressure loss, hydrodynamic stability, consequences of deposits, etc. The paper concludes with reference to the work being carried out within the C.E.G.B. in relation to the above problems. The facilities employed and the specific studies being made on them are described: these range from field trials on operational boilers to small scale laboratory investigations of underlying two phase flow mechanisms and include high pressure water rigs and a freon rig for simulation studies

  8. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  9. Optimization and Feasibility Analysis of Satellite Earth Station Power System Using Homer

    Directory of Open Access Journals (Sweden)

    Hassen T. Dorrah

    2012-06-01

    Full Text Available Satellite earth stations which located in remote areas are one of many applications powered by the renewable energy sources. Ground system consists of ground station and control centers working together to support the spacecraft and the data user. Earth station consists of major subsystems, transmitter, receiver, antenna, tracking equipment, terrestrial interface equipment and power supply. Power subsystem is an important part that required for supplying the earth station with electrical power to continue communicating with its remote sensing satellite. This paper deals with simulation and optimal sizing of earth station power system using HOMER software. A combination of two energy sources (solar, and wind to provide a continuous electric power production is used to determine the optimum system operation. Three system configurations are compared with respect to the total net present cost (NPC and levelized cost of energy (COE. Also, economical study will be analyzed for energy demand and sensitivity analysis will be performed.

  10. TEDS Base Station Power Amplifier using Low-Noise Envelope Tracking Power Supply

    DEFF Research Database (Denmark)

    Høyerby, Mikkel Christian Wendelboe; Andersen, Michael A. E.

    2009-01-01

    This paper demonstrates a highly linear and efficient TETRA enhanced data service (TEDS) base-station RF power amplifier (RFPA). Based on the well-known combination of an envelope tracking (ET) power supply and a linear class-A/B RFPA, adequate adjacent channel power ratio (ACPR) and wideband noise...... experimentally with a 9.6-dB peak-to-average 50-kHz 16 quadrature amplitude modulation TEDS carrier, the setup providing 44-dBm (25 W) average RF output power at 400 MHz with 44% dc-to-RF efficiency state-of-the-art ACPR of less than ${-}$67 dBc, switching noise artifacts around ${-}$ 85 dBc, and an overall rms...

  11. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  12. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  13. Study of wet blasting of components in nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hall, J

    1999-12-01

    This report looks at the method of wet blasting radioactive components in nuclear power stations. The wet blaster uses pearl shaped glass beads with the dimensions of 150-250 {mu}m mixed with water as blasting media. The improved design, providing outer operator's positions with proper radiation protection and more efficient blasting equipment has resulted in a lesser dose taken by the operators. The main reason to decontaminate components in nuclear power plants is to enable service on these components. On components like valves, pump shafts, pipes etc. oxides form and bind radiation. These components are normally situated at some distance from the reactor core and will mainly suffer from radiation from so called activation products. When a component is to be decontaminated it can be decontaminated to a radioactive level where it will be declassified. This report has found levels ranging from 150-1000 Bq/kg allowing declassification of radioactive materials.This difference is found between different countries and different organisations. The report also looks at the levels of waste generated using wet blasting. This is done by tracking the contamination to determine where it collects. It is either collected in the water treatment plant or collected in the blasting media. At Barsebaeck the waste levels, from de-contaminating nearly 800 components in one year, results in a waste volume of about 0,250 m{sup 3}. This waste consists of low and medium level waste and will cost about 3 600 EURO to store. The conclusions of the report are that wet blasting is an indispensable way to treat contaminated components in modern nuclear power plants. The wet blasting equipment can be improved by using a robot enabling the operators to remotely treat components from the outer operator's positions. There they will benefit from better radiation protection thus further reduce their taken dose. The wet blasting equipment could also be used to better control the levels of

  14. SOCIOECONOMIC MODEL OF THE DEVELOPMENT OF THE DEPRESSED REGION (EVIDENCE FROM VOLGOGRAD OBLAST

    Directory of Open Access Journals (Sweden)

    I. I. Kolpakov

    2014-06-01

    Full Text Available Goal It is important to determine the main socioeconomic problems of the industrial region of Russia and suggest the set of measures to overcome negative tendencies evidence from Volgograd oblast.Method and methodology of the research Systematic approach for the evaluation of the socioeconomic situation in the region was used as well as multifactorial approach was used to reveal the main problems of the research.Outcome Systematic evaluation of the causes of the negative socioeconomic state of the Volgograd oblast was made; the set of measures for the optimization, revealing of the socioeconomic reserves, activation of the regional development were formulated. The suggested set of measures is urgent for the regions with similar socioeconomic structure.Application of the outcomes              National economy, regional economics.Purchase on Elibrary.ru > Buy nowDOI: http://dx.doi.org/10.12731/2070-7568-2014-3-1

  15. SEMIOTICS OF SOCIAL MEMORY IN URBAN SPACE: THE CASE OF VOLGOGRAD (STALINGRAD

    Directory of Open Access Journals (Sweden)

    Irina Yanushkevich

    2014-06-01

    Full Text Available Social memory as a kind of collective memory is connected with the strategies and practices of perpetuating the memory about important events, and city as a commemorative space can be seen as a sign and as a text. The semiotic means encoding social phenomena and events represent the system of denotation, while the ways of place naming represent the culturally conditioned system of connotation operating behind the denotation code. The semiotics of social memory was examined by the example of the city of Volgograd (Stalingrad, the landscape of which appeals to a most significant historical event – the Great Patriotic War (World War II – and can be conveniently described by means of Ch. S. Peirce’s classification of signs in which icons include signs denoting war heroes and represented by their sculptural images; indices include signs denoting artifacts associated with the war events; symbols are represented by toponymic signs characterized by the connotations of heroic deeds; all these signs representing cultural and political values specific for the Volgograd society. The semiotic density of social memory representation may be considered a ground for shaping the city’s ‘imagined community’[1] of a particular kind.  [1] The term suggested by B. Anderson (Anderson 1983.

  16. Algological studies on the site of the Fessenheim nuclear power station

    International Nuclear Information System (INIS)

    Pierre, J.F.

    1980-01-01

    Systematic study of the algal flora at five stations situated on both sides of the nuclear power station at Fessenheim (department of Haut-Rhin, France). The analysis of the diatomaceae populations in 1977 and 1978, i.e. before and after the start of the reactors, does not indicate, in the composition and abundance of algae, any modifications susceptible to be directly connected to the implantation of the nuclear power station [fr

  17. Microprocessor control unit of thyristor regulator of microhydroelectric power station ballast load

    International Nuclear Information System (INIS)

    Nomokonova, Yu; Bogdanov, E

    2014-01-01

    The operational principle of microhydroelectric power station ballast load is presented. The comparative overview of the mathematical modeling methods is performed. The ranges of thyristors optimal work are shown as a result of the regulator regimes analysis. Shows the necessity of regulation the ballast load in microhydroelectric power station with help of developed algorithm of the program for microprocessor control

  18. Using plasma-fuel systems at Eurasian coal-fired thermal power stations

    Science.gov (United States)

    Karpenko, E. I.; Karpenko, Yu. E.; Messerle, V. E.; Ustimenko, A. B.

    2009-06-01

    The development of plasma technology for igniting solid fuels at coal-fired thermal power stations in Russia, Kazakhstan, China, and other Eurasian countries is briefly reviewed. Basic layouts and technical and economic characteristics of plasma-fuel systems installed in different coal-fired boiles are considered together with some results from using these systems at coal-fired thermal power stations.

  19. Exploration and practice on contract management of Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Yonggang

    2002-01-01

    In the market economy, Daya Bay Nuclear Power Station needs to out source or allow to suppliers among industries, while concentrating its core competitive capability, for safely and stable operation. By evaluating the features of contract management in Daya Bay Nuclear Power Station, set up the organization and process of the supply management

  20. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  1. Cause trending analysis for licensing operational events in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Dewei

    2005-01-01

    The human causal factors for all human error licensing operational events on Daya Bay nuclear power station since 1993 to 2003 are categorized, the trend of these causal factors is analyzed. The emphasis is placed on analyzing the deficiencies on complying with and executing regulations and procedures. The results provide directional reference for nuclear power station to improve human performance. (author)

  2. 77 FR 50533 - Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit 3

    Science.gov (United States)

    2012-08-21

    ....; Millstone Power Station, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... Optimized ZIRLO\\TM\\ fuel rod cladding in future core reload applications for Millstone Power Station, Unit 3...

  3. Papers of 7. Scientific-Technical Seminar Material Study for Electric Power Stations and Energetics

    International Nuclear Information System (INIS)

    2000-01-01

    The report is the assembly of the papers concerning the material problems occurring during the exploitation of power station and gas pipelines. The normalization problems in the power station and in the gas pipelines according to the prescription of UE are also discussed. (author)

  4. 76 FR 44821 - Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend...

    Science.gov (United States)

    2011-07-27

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend Rules... Digital Low Power Television, Television Translator, and Television Booster Stations and to Amend Rules... translator facilities in the 700 MHz band. These provisions provide procedures for a primary wireless...

  5. Construction of a nuclear power station in one's locality: attitudes and salience

    NARCIS (Netherlands)

    van der Pligt, J.; Eiser, J.R.; Spears, R.

    1986-01-01

    Examined the attitudes toward the building of a nuclear power station in one's locality by surveying 290 residents (mean age 47.5 yrs) of 3 small rural communities that were listed as possible locations for a new nuclear power station. Results show that a large majority of Ss opposed the building of

  6. 75 FR 76055 - Nebraska Public Power District Cooper Nuclear Station; Notice of Issuance of Renewed Facility...

    Science.gov (United States)

    2010-12-07

    ... NUCLEAR REGULATORY COMMISSION Docket No. 50-298; NRC-2008-0617] Nebraska Public Power District Cooper Nuclear Station; Notice of Issuance of Renewed Facility Operating License No. DPR-46 for an... Power District (NPPD), the operator of the Cooper Nuclear Station (CNS). Renewed facility operating...

  7. Comparison and evaluation of nuclear power plant options for geosynchronous power stations

    International Nuclear Information System (INIS)

    Williams, J.R.

    1975-01-01

    A solution to the safety, safeguards, and radwaste disposal problems of nuclear power is to locate the breeder reactor power plants far out in geosynchronous orbit and beam the power to earth with microwaves. The generation of nuclear power in space is technologically feasible and has already been demonstrated on a small scale. It has also been shown that high efficiency microwave transmission of power from synchronous orbit to earth is feasible and is not hazardous. The reactor safety problem would be virtually eliminated because of the remoteness of the satellite power station in geosynchronous orbit. The worst possible accident at such a plant would have negligible effect on the earth, certainly less than the high altitude nuclear explosions which have been conducted in the past. Accidental re-entry from geosynchronous orbit could not occur because of the very large velocity change required. The safeguards problem can be virtually eliminated by adopting the following procedures: 1) The plant is initially started up using U-235 fuel or bred plutonium or U-233 from another geosynchronous power plant, 2) Once the plant is operating, only nonhazardous fertile materials (thorium or depleted uranium) are shipped up from earth, 3) The fissile fuel is bred and used in space, and none of this highly toxic fissile material is ever returned to earth. The radioactive waste could be concentrated and ejected in canisters into deep space away from the earth. The geosynchronous nuclear power plant offers unlimited nuclear power without nuclear hazards or nuclear pollution, but at somewhat higher cost. Whether or not society will be willing to pay these higher costs of nuclear power from space, or whether new energy resources such as nuclear fusion or solar power become feasible, remains to be seen. A prudent course to follow would be to give careful consideration to all future options for large scale energy generation, including the option of nuclear power from space

  8. International lunar observatory / power station: from Hawaii to the Moon

    Science.gov (United States)

    Durst, S.

    Astronomy's great advantages from the Moon are well known - stable surface, diffuse atmosphere, long cool nights (14 days), low gravity, far side radio frequency silence. A large variety of astronomical instruments and observations are possible - radio, optical and infrared telescopes and interferometers; interferometry for ultra- violet to sub -millimeter wavelengths and for very long baselines, including Earth- Moon VLBI; X-ray, gamma-ray, cosmic ray and neutrino detection; very low frequency radio observation; and more. Unparalleled advantages of lunar observatories for SETI, as well as for local surveillance, Earth observation, and detection of Earth approaching objects add significant utility to lunar astronomy's superlatives. At least nine major conferences in the USA since 1984 and many elsewhere, as well as ILEWG, IAF, IAA, LEDA and other organizations' astronomy-from-the-Moon research indicate a lunar observatory / power station, robotic at first, will be one of the first mission elements for a permanent lunar base. An international lunar observatory will be a transcending enterprise, highly principled, indispensable, soundly and broadly based, and far- seeing. Via Astra - From Hawaii to the Moon: The astronomy and scie nce communities, national space agencies and aerospace consortia, commercial travel and tourist enterprises and those aspiring to advance humanity's best qualities, such as Aloha, will recognize Hawaii in the 21st century as a new major support area and pan- Pacific port of embarkation to space, the Moon and beyond. Astronomical conditions and facilities on Hawaii's Mauna Kea provide experience for construction and operation of observatories on the Moon. Remote and centrally isolated, with diffuse atmosphere, sub-zero temperature and limited working mobility, the Mauna Kea complex atop the 4,206 meter summit of the largest mountain on the planet hosts the greatest collection of large astronomical telescopes on Earth. Lunar, extraterrestrial

  9. Data logger system of Tokai (I) Nuclear Power Station, the Japan Atomic Power Company

    International Nuclear Information System (INIS)

    Machida, Akira; Chikahata, Kiyomitsu; Nakamura, Mamoru; Nanbu, Taketoshi; Kawakami, Hiroshi

    1977-01-01

    The Tokai(I) nuclear power station, the Japan Atomic Power Company, was commissioned in July, 1966. In this station, temperatures of about 700 points are monitored and recorded with a data logger. However, the logger was manufactured some 15 years ago, therefore it is now old-fashioned, and has caused frequent failures these 2 or 3 years. So it was decided to replace it with a new one, and the process control computer, U-300 system including CRT display, has been adopted considering the latest trend in U.K. The control and monitoring system in this station is not a centralized control system, but a distributed control system divided into three control rooms, namely main control room, turbine generator control room and fuel exchanger (cask machine) control room. Therefore for grasping the complete plant conditions at the main control room, the system has not been convenient, and the centralization of data processing has been desired from the viewpoint of operation. The new logger system is composed so as to facilitate the centralized monitoring in the main control room, considering the above requirement. It has been improved so as to have seven important functions in addition to the existing functions. Hardware and software of this system are briefly explained. The new system was started up in February 1977, and is now operating well, though some early failures were experienced. (Wakatsuki, Y.)

  10. 47 CFR 73.6019 - Digital Class A TV station protection of low power TV, TV translator, digital low power TV and...

    Science.gov (United States)

    2010-10-01

    ... power TV, TV translator, digital low power TV and digital TV translator stations. 73.6019 Section 73... low power TV, TV translator, digital low power TV and digital TV translator stations. An application... A TV station will not be accepted if it fails to protect authorized low power TV, TV translator...

  11. Experience gained in the operation of the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Kueffer, K. von.

    1976-01-01

    The 24th December 1969, when the Beznau 1 nuclear power station was placed in commercial operation, marked the beginning of electricity production from nuclear energy in Switzerland. Beznau 2 followed on the 15th March 1972. Together with the Muehleberg nuclear power station, nuclear energy accounts for approximately 20 percent of the total electricity production in Switzerland. Until the end of 1975, Switzerland's three nuclear power stations had a mean energy utilisation factor of 71.3 percent which, as compared with a mean energy utilization factor of 60.5 percent for all the nuclear power stations in the West, suggests fairly good operational results. Problems that arose during operation are discussed in detail. By way of summary it is stated that the operation of the Beznau nuclear power station has so far proved a success. The production of electrical energy has always remained within the limits imposed by the law and by the safety aspects. (Auth.)

  12. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    2011-12-01

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  13. Radioactive waste treatment system for Tsuruga Nuclear Power Station

    International Nuclear Information System (INIS)

    Taniguchi, Takashi; Takeshima, Masaki; Saito, Toru; Kikkawa, Ryozo

    1978-01-01

    The augmentation of the radioactive waste treatment system in the Tsuruga Nuclear Power Station was planned in 1973, and this enlarged facility was completed in June, 1977. The object of this augmentation is to increase the storage capacity for wastes and to enlarge the treating capacity utilizing the newly installed facility. The operating experience in the facility having been already constructed was fed back for the engineering of this new facility. This new facility contains the newly developed vacuum forced circulation type concentrator, the exclusive storage pool for solid wastes, etc. At the design stage of this new system, the pilot plant test of slurry transportation and the corrosion test of long hours were carried out as the research and developmental works for the confirmation of correct design condition. The measures for augmenting this radioactive waste treatment system are the installation of a long time storage tank with the capacity of 350 m 3 , the sit bunker facility and the drum storage as the storage facility, and the vacuum forced circulation type concentrator with the circulating flow rate more than 200 times as much as the treating flow rate and vacuum level of 0.255 ata. The augmented system is shown with the flow sheet of whole waste disposal system. The flow sheet of the concentrator is separately shown, and the relating research and developmental works, for example, the test of the cause of corrosion, the surface finishing test, the material test, the blockage test for heat transfer tubes and the inhibiter test, are explained with the test results. The ion exchange resin is transported by air and water as the slurry state, and the long distance transport of about 250 m is required in this new system. As clogging has to be avoided in this transportation, the experimental work was conducted to obtain the flow characteristics of slurry, and the test result is outlined. (Nakai, Y.)

  14. Release criteria for decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Eger, K.J.; Gardner, D.L.; Giordano, R.J.

    1986-01-01

    The United States Department of Energy (DOE) has established guidelines for allowable levels of residual radioactivity at remote sites in the Surplus Facilities Management Program (SFMP). These guidelines specify that doses to the public from this residual radioactivity must not exceed 500 mrem/year (for up to five years) or 100 mrem/year (for a lifetime), regardless of the use of the land. The guidelines also specify that exposures be further limited, depending on ALARA considerations. The decommissioning of the Shippingport Atomic Power Station, done under the auspices of SFMP, is being performed in accordance with these guidelines. It follows that, at the conclusion of the project, the concentrations of residual radioactivity, identified both by isotope and location (x,y,z), must be low enough so that the guidelines (500,100) are not exceeded. Furthermore, the concentrations must be low enough so that additional action which might be taken to reduce them cannot cost effectively decrease the dose to the public. A cost-benefit analysis, based on actual conditions at Shippingport, is being prepared to identify these ''low-enough'' concentrations. Once identified, these concentrations will comprise the release criteria for the site. The analysis will be developed by (1) performing an initial site characterization, (2) employing pathways analyses to compute the dose to a future occupant, (3) costing of proposed site modifications, and (4) repeating a pathways analysis based on each ''as-modified'' location on the site. The result will be a paired set of data relating the cost of modification to the reduction in the dose to the future occupant

  15. Recent advances in automated ultrasonic inspection of Magnox power stations

    International Nuclear Information System (INIS)

    Wooldridge, A.B.

    2006-01-01

    Magnox Electric operates a number of Magnox nuclear power stations, some of which have presented difficult inspection challenges. This paper will describe recent advances in automated ultrasonic techniques which have enabled additional, fully effective and qualified inspections to be introduced. The examples chosen involve phased array inspection of fillet welds and the introduction of 3D data display and analysis using NDT Workbench. Ultrasonic phased arrays have been optimised for inspection of fillet welded structures where physical access for the operator is very awkward and the surfaces available for probe scanning are very restricted. In addition to controlling the beam direction and focus depth, the systems have also optimised the depth of field by varying the number of phased array elements fired at a given time. These phased array inspections are substantially superior in quality, reliability and speed compared with that achievable by conventional manual inspection. Analysis of automated ultrasonic data can be very time-consuming if defects are complex. NDT Workbench significantly improves data analysis for complex geometries and defects primarily because of the 3D data displays of multiple beams and automated logging of measurements. This system has been used in 2005 for data analysis of complex defects where sizing accuracy was particularly important. Both these inspection procedures have been formally qualified using the ENIQ (European Network for Inspection Qualification) Methodology. Such qualification was achieved more easily because of the rigorous in house training programmes established in each case and because the Technical Justifications referred to evidence from previous related qualifications whenever appropriate. The timely achievement of inspection qualification demonstrates that the new systems have reached sufficient maturity to be used with confidence for high quality inspections. (orig.)

  16. Ethanolamine experience at Koeberg nuclear power station, South Africa

    International Nuclear Information System (INIS)

    Galt, K.J.; Caris, N.B.

    2002-01-01

    Following testing of ethanolamine as an alternative to ammonia on Unit 2 in 1997, Unit 1 of the Koeberg Nuclear Power Station was converted to ethanolamine in 1998. The Unit has now operated for just over one and a half cycle on ETA. The decision to change to ETA was made to achieve further reductions in feedwater iron transport. Koeberg has always operated ammonia/hydrazine AVT control and ran the feedwater pH at 9.6-9.7 before the changeover. The original pH levels were increased in response to concerns over flow-accelerated corrosion. A by product of reducing the FAC rates is a reduction in iron transport. Although nominally all-ferrous, there are a number of small copper-containing components and the Koeberg Engineering Department would not countenance a further increase in ammonia concentrations in case of copper transport to the SGs. This led to ethanolamine being selected as an alternative to ammonia. The Koeberg condensate polishing plant has been modified, largely to accommodate ETA operation, but is not currently operable in the modified configuration. It is therefore on standby while ETA is implemented. The SG blowdown demineralizers have begun to be operated past ammonia/ETA break, but optimisation is largely dependent on CPP availability in the modified configuration. This paper documents the Koeberg experience to date of operation under an ethanolamine-AVT regime. As one of the few plants outside of the USA to have changed to ethanolamine, it is hoped we can make a valuable contribution for other non-US plants considering such a move. (authors)

  17. Burning issue of energy problem after Fukushima disaster of TEPCO's atomic power stations

    International Nuclear Information System (INIS)

    Harada, Shoji

    2012-01-01

    Strikes of unanticipated enormous earthquake and subsequent tsunami brought unbelievable disaster in eastern Japan on March 11, 2012. In particular, collapse of cooling system of TEPCO's Fukushima atomic power stations resulted in IAEA-defined level7 accident including heavy radiation, hydrogen explosion -induced collapse of the building of power station No.2 and No.4 and melt through of nuclear pressure vessel No1.3.4 At an initial stage of the disaster, nobody knew precisely what happened at the power stations. According to the recent report of the national investigation committee, precise reason of the collapse of the cooling system whether it was induced by the strike of huge earthquake or tsunami is still unclear. Due to poor risk management of the government and TEPCO and closure of the precise disaster information, people became suspicious and nervous about the atomic power station. Fifty four atomic power stations have been constructed for these forty years in Japan. On last May 04, all the atomic power stations were shut down due to periodic inspection. However, restart of them became hot discussion. Although atomic power station was regarded as a powerful tool to reduce carbon dioxide several years ago, this situation after March 11 completely changed. In many countries which possess atomic power station, making a road map to develop recyclable energy is a burning issue. It should be noted that German spent about thirty years to declare atomic energy free society. Finally necessity of succession of technology of utilizing atomic power is emphasized. Politics on depending atomic power differs in each country. Therefore, study from Fukushima disaster should be widely used to prevent from unexpected accident of atomic power station.

  18. Annual report of operation management in nuclear power stations, fiscal year 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 26 % of electric power supply. As to the capacity factor, 76 % was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported. (Kako, I.)

  19. FLAME MONITORING IN POWER STATION BOILERS USING IMAGE PROCESSING

    Directory of Open Access Journals (Sweden)

    K. Sujatha

    2012-05-01

    Full Text Available Combustion quality in power station boilers plays an important role in minimizing the flue gas emissions. In the present work various intelligent schemes to infer the flue gas emissions by monitoring the flame colour at the furnace of the boiler are proposed here. Flame image monitoring involves capturing the flame video over a period of time with the measurement of various parameters like Carbon dioxide (CO2, excess oxygen (O2, Nitrogen dioxide (NOx, Sulphur dioxide (SOx and Carbon monoxide (CO emissions plus the flame temperature at the core of the fire ball, air/fuel ratio and the combustion quality. Higher the quality of combustion less will be the flue gases at the exhaust. The flame video was captured using an infrared camera. The flame video is then split up into the frames for further analysis. The video splitter is used for progressive extraction of the flame images from the video. The images of the flame are then pre-processed to reduce noise. The conventional classification and clustering techniques include the Euclidean distance classifier (L2 norm classifier. The intelligent classifier includes the Radial Basis Function Network (RBF, Back Propagation Algorithm (BPA and parallel architecture with RBF and BPA (PRBFBPA. The results of the validation are supported with the above mentioned performance measures whose values are in the optimal range. The values of the temperatures, combustion quality, SOx, NOx, CO, CO2 concentrations, air and fuel supplied corresponding to the images were obtained thereby indicating the necessary control action taken to increase or decrease the air supply so as to ensure complete combustion. In this work, by continuously monitoring the flame images, combustion quality was inferred (complete/partial/incomplete combustion and the air/fuel ratio can be automatically varied. Moreover in the existing set-up, measurements like NOx, CO and CO2 are inferred from the samples that are collected periodically or by

  20. Radiocarbon Mass Balance for a Magnox Nuclear Power Station

    International Nuclear Information System (INIS)

    Metcalfe, M.P.; Mills, R.W.

    2016-01-01

    Nuclear power generation in the United Kingdom is based principally on graphite-moderated gas-cooled reactors. The mass of irradiated graphite associated with these reactors, including material from associated experimental, prototype and production reactors, exceeds 96,000 tonnes. One of the principal long-lived radionuclides produced during graphite irradiation is radiocarbon (C-14), which has a half-life of 5730 ± 40 years. Decommissioning and graphite waste management strategies must take account of this radionuclide. In order to identify appropriate options for addressing the potential hazard of C-14, it is important that the production processes are understood and the distributions and concentrations of C-14 are characterised. In fact, C-14 precursors and their activation processes are well-known. However, there is ongoing debate over the relative importance of different C-14 precursors, which will determine the location of C-14 within graphite components and hence its mobility/response to treatment. A generally held misconception concerning C-14 in irradiated graphite is that generic statements can be made about its precursors and their location. C-14 location and activities will depend upon the composition of the original manufactured graphite (raw materials, impurities), the chemical environment of the graphite during service and the irradiation history of the graphite. So, while there may be some similarities across, for example, carbon dioxide cooled graphite moderated designs (Magnox, AGR, UNGG), any informed assessment of a core’s C-14 inventory would require more-precise characterisation. The analysis presented here focuses on a UK Magnox reactor core, Reactor 1 at Wylfa Nuclear Power Station. The objective of the analysis is to present a full C-14 mass balance over a selected period of operation for which there are accurate C-14 discharge records. The analysis presented here provides the first assessment of the principal C-14 activation pathways

  1. Autonomous power expert fault diagnostic system for Space Station Freedom electrical power system testbed

    Science.gov (United States)

    Truong, Long V.; Walters, Jerry L.; Roth, Mary Ellen; Quinn, Todd M.; Krawczonek, Walter M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control to the Space Station Freedom Electrical Power System (SSF/EPS) testbed being developed and demonstrated at NASA Lewis Research Center. The objectives of the program are to establish artificial intelligence technology paths, to craft knowledge-based tools with advanced human-operator interfaces for power systems, and to interface and integrate knowledge-based systems with conventional controllers. The Autonomous Power EXpert (APEX) portion of the APS program will integrate a knowledge-based fault diagnostic system and a power resource planner-scheduler. Then APEX will interface on-line with the SSF/EPS testbed and its Power Management Controller (PMC). The key tasks include establishing knowledge bases for system diagnostics, fault detection and isolation analysis, on-line information accessing through PMC, enhanced data management, and multiple-level, object-oriented operator displays. The first prototype of the diagnostic expert system for fault detection and isolation has been developed. The knowledge bases and the rule-based model that were developed for the Power Distribution Control Unit subsystem of the SSF/EPS testbed are described. A corresponding troubleshooting technique is also described.

  2. The Environment Friendly Power Source for Power Supply of Mobile Communication Base Stations

    Science.gov (United States)

    Rudenko, N. V.; Ershov, V. V.; Evstafiev, V. V.

    2017-05-01

    The article describes the technical proposals to improve environmental and resource characteristics of the autonomous power supply systems of mobile communication base stations based on renewable energy sources, while ensuring the required reliability and security of power supply. These include: the replacement of diesel-generator with clean energy source - an electrochemical generator based on hydrogen fuel cells; the use of wind turbines with a vertical axis; use of specialized batteries. Based on the analysis of the know technical solutions, the structural circuit diagram of the hybrid solar-wind-hydrogen power plant and the basic principles of the algorithm of its work were proposed. The implementation of these proposals will improve the environmental and resource characteristics.

  3. Performance of on-power fuelling equipment at Rajasthan Atomic Power Station

    International Nuclear Information System (INIS)

    Jayabarathan, S.; Gopalakrishnan, S.

    1977-01-01

    Natural uranium reactors on account of their intrinsically low reactivity need frequent refuelling. The Rajasthan Atomic Power Station based on natural uranium reactors has, therefore, been provided with on-power fuel handling system which was installed in 1972. Its performance has met the design intent and operational objectives which are enumerated. However, continuous fuelling 7 to 10 days has not been possible because frequent maintenance of refuelling system is needed on account of certain deficiencies major of which is the heavy water leakage. For better performance, installation of a programmable logic controller is suggested. Mention has also been made of inadequate number of skilled man-power required for maintenance which leads to quick depletion of man-rem of all the available personnel trained for maintenance work. (M.G.B.)

  4. Training of engineers for nuclear power station operation

    International Nuclear Information System (INIS)

    Myerscough, P.B.

    1980-01-01

    The requirements for staffing and training of a nuclear electric utility are described. Current training facilities at the Central Electricity Generating Board are applicable to gas-cooled technology with the possibility of the introduction of a thermal water system and fast reactors in the future. The CEGB training centres provide for the initial training of operational staff, revision training of experienced operational staff, and training of non-operational staff from the stations and supporting departments. Details are given of the content of the training courses which also provide simulation facilities of the basic dynamics of the CEGB stations. Further developments in simulation will include dynamics of the boiler and turbine plants in Magnox stations. The flexibility of the AGR simulations will enable the training exercises to be adjusted to meet changing operating patterns for each AGR station. (U.K.)

  5. Energy Sharing Framework for Microgrid-Powered Cellular Base Stations

    KAUST Repository

    Farooq, Muhammad Junaid; Ghazzai, Hakim; Kadri, Abdullah; Elsawy, Hesham; Alouini, Mohamed-Slim

    2017-01-01

    Cellular base stations (BSs) are increasingly becoming equipped with renewable energy generators to reduce operational expenditures and carbon footprint of wireless communications. Moreover, advancements in the traditional electricity grid allow two

  6. Creation of nuclear power stations for export. Adapting a reference power station from the technical level of a national programme

    International Nuclear Information System (INIS)

    Marcaillou, J.; Haond, H.; Py, J.P.

    1977-01-01

    The recent evolution of primary energy supplies places those countries with a nuclear industry in an exporting role. Exporting countries have generally developed a limited number of national reactor types and attempt to extend their manufacture with as few changes as possible. The EDF in France is implementing an important 900-MW(e) PWR programme based on Framatome nuclear reactors, initially conceived by Westinghouse. Standardization imposes constraints, has limits, but offers incontestable advantages in terms of reliability, availability and security. These advantages were highly appreciated during the introduction into service of conventional thermal loads. Importing countries are all concerned to purchase a proven model. However, various local restrictions are often present, which are usually different from those accounted for in the export model, thus resulting in a need for modification. The different ways of considering the inescapable constraints can be analysed and their influence on the 'disfigurement' of the reactor model can be examined. Some of these constraints are connected with characteristics of the site. The nature of the soil and the seismicity influence the foundation and the depth of the installation and the choice between a foundation on antiseismic supports or structural reinforcement. The hydrology (risk of flooding or of deviation of the cold source) influences the choice between elevation of the installation and a protective dike, and also the stand-by coolant circuit. The atmospheric conditions and the temperature of cooling water influence the materials and their conditioning as well as the power level of the station. The surrounding demography influences the waste treatment systems. The characteristics of the electricity network influence the plan of the electric power supply and the conditions of operation. Finally, the characteristics of the personnel of the undertaking provide training problems. Other parameters to be taken into

  7. Discharges to the environment and environmental protection at CEGB power stations

    International Nuclear Information System (INIS)

    Wright, J.K.

    1981-01-01

    The subject is discussed under the headings: introduction (scope of paper will cover the principles, methods and results obtained in environmental protection in relation to atmospheric discharges made routinely during power generation); air pollution control; nuclear power stations (type of discharge, annual discharges, environmental monitoring); fossil fuelled power stations; health effects; trace elements; long range transport and acid rain; future coal fired plant; carbon dioxide. (U.K.)

  8. Standard concerning the design of nuclear power stations in earthquake-prone districts

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Anbriashivili, Y.K.; Suvilova, A.V.

    1980-01-01

    The measures of security assurance against the effect of radioactive contamination has become more and more complex due to the construction of nuclear power stations of diverse types. The aseismatic measures for the nuclear power stations built in the districts where earthquakes of different intensity occur are important problems. All main machinery and equipments and emergency systems in power stations must be protected from earthquakes, and this makes the solution of problems difficult. At present in USSR, the provisional standard concerning the design of atomic energy facilities built in earthquake-prone districts is completed. The basic philosophy of the standard is to decide the general requirements as the conditions for the design of nuclear power stations built in earthquake-prone districts. The lowest earthquake activity in the construction districts is considered as magnitude 4, and in the districts where earthquake activity is magnitude 9 or more, the construction of nuclear power stations is prohibited. Two levels of earthquake action are specified for the design: design earthquake and the largest design earthquake. The construction sites of nuclear power stations must be 15 to 150 km distant from the potential sources of earthquakes. Nuclear power stations are regarded as the aseismatically guaranteed type when the safety of reactors is secured under the application of the standard. The buildings and installations are classified into three classes regarding the aseismatic properties. (Kako, I.)

  9. 47 CFR 73.6012 - Protection of Class A TV, low power TV and TV translator stations.

    Science.gov (United States)

    2010-10-01

    ... translator stations. 73.6012 Section 73.6012 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... of Class A TV, low power TV and TV translator stations. An application to change the facilities of an... power TV and TV translator stations and applications for changes in such stations filed prior to the...

  10. The duty health physicist program at Byron Nuclear Power Station

    International Nuclear Information System (INIS)

    Goldsmith, D.G.; Carey, T.R.

    1987-01-01

    The Duty Health Physicist Program at Byron Station was established to deal with routine health physics tasks and provide an interface between frontline and upper radiation-chemistry management. The program consists of a weekly rotation of selected members of the health physics staff into the duty health physicist position to handle the assigned duty tasks. The tasks include, but are not limited to, daily isotopic and air sample review, effluent release package review, maximum permissible concentration calculations, dose approvals, as-low-as-reasonably-achievable action review of pending jobs, and general availability to answer questions and address problems in health-physics-related areas of plant operation. The daily attendance of the duty health physicist at the radiation-chemistry and station plan-of-the-day meetings has increased the overall presence and visibility of the health physics program to upper station management and other station departments. Since its inception in July of 1985, the Duty Health Physics Program has been a major contributor to the observed 50% reduction in reportable personnel errors in the radiation-chemistry department (based on personnel-error-related deviation reports and license event reports generated on the radiation-chemistry department at Byron Station). Although difficulty to quantify, other important benefits of this program are also discussed in this paper

  11. Economic and financial benefits as a compensation for living near a nuclear power station. A case study of Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kato, Takaaki; Hatta, Masahisa; Matsumoto, Shiro; Nishikawa, Masashi

    2007-01-01

    Although dwellers living near a nuclear power station are entitled to economic/financial benefits such as increased job opportunities and local tax revenues pertaining to the power station, it is not clear whether such benefits are appreciated by the dwellers. Two findings of this study based upon a social survey of local dwellers living near the Kashiwazaki-Kariwa Nuclear Power Station are summarized as follows. First, an increase in the per capita sizes of the local tax revenue and national subsidies resulted in a larger share of respondents who thought that those revenues are beneficial. Therefore, local dwellers are aware of the sizes of economic/financial benefits. Second, given the same risk level of nuclear disaster, a larger per capita financial benefit resulted in a larger share of respondents who felt compensated for the nuclear risk. However, this increase in the number of compensated respondents is low relative to the increase in the amount of financial benefits. (author)

  12. CFD research on runaway transient of pumped storage power station caused by pumping power failure

    International Nuclear Information System (INIS)

    Zhang, L G; Zhou, D Q

    2013-01-01

    To study runaway transient of pumped storage power station caused by pumping power failure, three dimensional unsteady numerical simulations were executed on geometrical model of the whole flow system. Through numerical calculation, the changeable flow configuration and variation law of some parameters such as unit rotate speed,flow rate and static pressure of measurement points were obtained and compared with experimental data. Numerical results show that runaway speed agrees well with experimental date and its error was 3.7%. The unit undergoes pump condition, brake condition, turbine condition and runaway condition with flow characteristic changing violently. In runaway condition, static pressure in passage pulses very strongly which frequency is related to runaway speed

  13. Mission Analysis for LEO Microwave Power-Beaming Station in Orbital Launch of Microwave Lightcraft

    Science.gov (United States)

    Myrabo, L. N.; Dickenson, T.

    2005-01-01

    A detailed mission analysis study has been performed for a 1 km diameter, rechargeable satellite solar power station (SPS) designed to boost 20m diameter, 2400 kg Micr,oWave Lightcraft (MWLC) into low earth orbit (LEO) Positioned in a 476 km daily-repeating oi.bit, the 35 GHz microwave power station is configured like a spinning, thin-film bicycle wheel covered by 30% efficient sola cells on one side and billions of solid state microwave transmitter elements on the other, At the rim of this wheel are two superconducting magnets that can stor,e 2000 G.J of energy from the 320 MW, solar array over a period of several orbits. In preparation for launch, the entire station rotates to coarsely point at the Lightcraft, and then phases up using fine-pointing information sent from a beacon on-board the Lightcraft. Upon demand, the station transmits a 10 gigawatt microwave beam to lift the MWLC from the earth surface into LEO in a flight of several minutes duration. The mission analysis study was comprised of two parts: a) Power station assessment; and b) Analysis of MWLC dynamics during the ascent to orbit including the power-beaming relationships. The power station portion addressed eight critical issues: 1) Drag force vs. station orbital altitude; 2) Solar pressure force on the station; 3) Station orbital lifetime; 4) Feasibility of geo-magnetic re-boost; 5) Beta angle (i..e., sola1 alignment) and power station effective area relationship; 6) Power station percent time in sun vs, mission elapsed time; 7) Station beta angle vs.. charge time; 8) Stresses in station structures.. The launch dynamics portion examined four issues: 1) Ascent mission/trajecto1y profile; 2) MWLC/power-station mission geometry; 3) MWLC thrust angle vs. time; 4) Power station pitch rate during power beaming. Results indicate that approximately 0 58 N of drag force acts upon the station when rotated edge-on to project the minimum frontal area of 5000 sq m. An ion engine or perhaps an electrodynamic

  14. Exchange of pressurizer safeguarding system at Biblis nuclear power station

    International Nuclear Information System (INIS)

    Weber, D.; Hofbeck, W.

    1991-01-01

    Valves and piping of the pressurizer safeguarding system are exchanged and reset in such a way that they are suitable not only for discharging steam, but also for discharging a water-steam mixture and hot pressurized water; for the emergency measure of primary depressurization by hand (bleed) in the event of failure of the entire feedwater supply and station black-out, and in the event of operational transients with supposed failure of the reactor scram (ATWS). To achieve this, in addition to the requirements of the pressurizer discharging station, changes have to be made to the valve drive to dominate the water loads. During the 1990 inspection this exchange of the pressurizer discharging station was performed at the Biblis A unit as the first German plant. (orig.) [de

  15. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  16. TECHNICAL AND ECONOMICAL COMPARISON OF OVERFLOW DAM VARIANTS AT THE GRODNO WATER-POWER STATION

    Directory of Open Access Journals (Sweden)

    G. G. Krouglov

    2005-01-01

    Full Text Available The paper considers various aspects pertaining to determination of main technical characteristics of water-development projects of water-power stations. Technical and economical characteristics of overflow dams at the Grodno water-power station are compared in the paper.The paper contains results of model investigations of two-tier overflow dam which is included in composition of the Grodno water-power station and presents methodology for calculation of pool integration behind two-tier dam which has been developed at the water-development and power engineering department. This methodology makes it possible to determine rate coefficient and compressed depth. In addition to this the paper gives technical and economical comparison of various designs of overflow dams at the Grodno water-power station, analyzes their cost and on the basis of this comparative analysis it is recommended to construct a two-pier dam. 

  17. Minimal average consumption downlink base station power control strategy

    OpenAIRE

    Holtkamp H.; Auer G.; Haas H.

    2011-01-01

    We consider single cell multi-user OFDMA downlink resource allocation on a flat-fading channel such that average supply power is minimized while fulfilling a set of target rates. Available degrees of freedom are transmission power and duration. This paper extends our previous work on power optimal resource allocation in the mobile downlink by detailing the optimal power control strategy investigation and extracting fundamental characteristics of power optimal operation in cellular downlink. W...

  18. Fish cultures in the area of the nuclear power station Dukovany and their prospects

    International Nuclear Information System (INIS)

    Penaz, M.

    1980-01-01

    The results of investigating the fishery production and measurements of radiation background in the ecosystem of the Jihlava river, in the area of a nuclear power station being built near Dukovany are evaluated with regard to the prospects of fish cultures when the power station operates in full extent. Basic data were provided for calculating the burden of significant groups of the population, resulting from the ingestion of fish of local provenance. All available information shows that under normal operating conditions, the power station should not exert a negative influence on the quality of fish food and that in the area under study it would be possible to manage intensive fish cultures. (author)

  19. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  20. The accident prevention regulation 'Thermal Power Stations' and its effects in practice

    International Nuclear Information System (INIS)

    Albert, O.

    1983-01-01

    The origin of the accident prevention regulation - ''Thermal Power Stations'' is attributable mainly to two tragic accidents. It has made organizational changes and interventions in the operational process necessary in thermal power stations. Emphasis is laid upon the consistent issue of written permits-to-work on plant components carrying a heating medium and operating under pressure and on written operating licences for the operation of boilers. The paper describes additional ways in which regulation influences the daily practices of the power station operator. Brief references is made to the draft of the revised regulation. (orig./HP) [de

  1. Some novel on-power refuelling features of CANDU stations

    International Nuclear Information System (INIS)

    Erwin, D.; Pendlebury, B.; Watson, J.F.; Welch, A.C.

    1976-01-01

    Part A of the paper describes the reasons for, and advantages resulting from, the use of flow assisted refuelling in the CANDU type nuclear reactors at the Pickering Generating Station. A separate fuel handling system is used for each reactor unit, as distinct from the system employed at the Bruce Generating station, where the fuel handling system is shared among several units. Part B of the paper describes some of the advantages of the shared concept with particular emphasis on the availability of the fuel handling system. (author)

  2. Commerical electric power cost studies. Capital cost addendum multi-unit coal and nuclear stations

    International Nuclear Information System (INIS)

    1977-09-01

    This report is the culmination of a study performed to develop designs and associated capital cost estimates for multi-unit nuclear and coal commercial electric power stations, and to determine the distribution of these costs among the individual units. This report addresses six different types of 2400 MWe (nominal) multi-unit stations as follows: Two Unit PWR Station-1139 MWe Each, Two Unit BWR Station-1190 MWe Each, Two Unit High Sulfur Coal-Fired Station-1232 MWe Each, Two Unit Low Sulfur Coal-Fired Station-1243 MWe Each, Three Unit High Sulfur Coal-Fired Station-794 MWe Each, Three Unit Low Sulfur Coal-Fired Station-801 MWe Each. Recent capital cost studies performed for ERDA/NRC of single unit nuclear and coal stations are used as the basis for developing the designs and costs of the multi-unit stations. This report includes the major study groundrules, a summary of single and multi-unit stations total base cost estimates, details of cost estimates at the three digit account level and plot plan drawings for each multi-unit station identified

  3. Reduction technique of drop voltage and power losses to improve power quality using ETAP Power Station simulation model

    Science.gov (United States)

    Satrio, Reza Indra; Subiyanto

    2018-03-01

    The effect of electric loads growth emerged direct impact in power systems distribution. Drop voltage and power losses one of the important things in power systems distribution. This paper presents modelling approach used to restructrure electrical network configuration, reduce drop voltage, reduce power losses and add new distribution transformer to enhance reliability of power systems distribution. Restructrure electrical network was aimed to analyse and investigate electric loads of a distribution transformer. Measurement of real voltage and real current were finished two times for each consumer, that were morning period and night period or when peak load. Design and simulation were conduct by using ETAP Power Station Software. Based on result of simulation and real measurement precentage of drop voltage and total power losses were mismatch with SPLN (Standard PLN) 72:1987. After added a new distribution transformer and restructrured electricity network configuration, the result of simulation could reduce drop voltage from 1.3 % - 31.3 % to 8.1 % - 9.6 % and power losses from 646.7 watt to 233.29 watt. Result showed, restructrure electricity network configuration and added new distribution transformer can be applied as an effective method to reduce drop voltage and reduce power losses.

  4. Ecoreconstruction of city space of Volgograd basing on suburbanization principles of city territories

    Directory of Open Access Journals (Sweden)

    Potapov Aleksandr Dmitrievich

    2014-07-01

    Full Text Available The nature is subject to severe antropogenous impacts and dramatically changes its quality. Urban development is a process of environmental intervention, a process of its artificial change in such a speed, which doesn’t correspons to the speed of biospheric evolutions and natural selection. By improving our life quality, a human destroys the usual interrelation of living organisms with natural environment. The concepts of urban development and suburbanization of territories existing nowadays have their advantages and disadvantages from ecological point of view. The paper considers the reasons and major problems of ecological reconstruction of the urban space. Preconditions of the integrated ecological approach to the town evolution are shown in the work, as well as some generalizing conclusions concerning security assurance of the environment of the city of Volgograd. The priority trend for the urban areas suburbanization is presented.

  5. Advanced Hygrothermal Performance of Building Component at Reconstruction of S. Radonezhskiy Temple in Volgograd

    Directory of Open Access Journals (Sweden)

    Korniyenko Sergey

    2016-01-01

    Full Text Available The paper presents new thermal design of external wall S. Radonezhskiy temple in Volgograd is developed according to author’s concept. The three-layer brick wall, including a thermal insulation layer from concrete with polystyrene aggregates, is considered. Calculation of interstitial condensation in building component is carried out according to simplified calculation method developed by the author and harmonized to ISO 13788. Analysis of calculation results shows that condensation occurs at one interface during some months but there is no accumulation over the year as all the condensate is predicted to evaporate again. Thus, there is no systematic moisture accumulation at the building component within a year. The risk of run-off from non-absorbent materials will be very low. Analysis of the evaporation rates at the interface shows that duration of drying wetted layer in external wall during initial stage does not exceed admissible values.

  6. The training and assessment of operations engineers at Hinkley Point 'B' nuclear power station

    International Nuclear Information System (INIS)

    Walsey, B.A.; Howard, J.D.

    1986-01-01

    The Nuclear Power Training Centre at Oldbury-on-Severn was established to provide a common training of staff at all nuclear power stations operated by the Central Electricity Generating Board, following the ''Standard Specification for the Nuclear Training of Staff at CEGB Nuclear Power Stations''. The paper deals with the following aspects of AGR Stations: The Legislation applicable to these stations. The current training requirements for Operations Staff. The development of training for operations staff at Hinkley Point 'B' including training for career progression within the Operations Department. A detailed explanation of the training package developed for Reactor Desk Drivers at Hinkley 'B'. Revision training of Operations staff to ensure that they continue to run the plant in a safe and commercially viable manner. The training of Shift Operations Engineers for their duties under the Station Emergency Plan. (author)

  7. Scholar and teacher: V.A. Kitaev at the history department of Volgograd State University

    Directory of Open Access Journals (Sweden)

    Kuznetsov Oleg Viktorovich

    2013-11-01

    Full Text Available Vladimir A. Kitaev was born 1941. He was the first dean of the Faculty of History and the first head of the Department of History of the USSR (now the Department of History of Russia of Volgograd State University, reputable scientist, recognized expert in the history of the Russian social thought. The article shows the role of V.A. Kitaev in the formation and development of the faculty and the department. A characteristic of V.A. Kitaev’ sresearch and teaching activities is given. Kitaev’s featuresas a scholar and teacher such as great erudition, science scrupulosity, exactingness to himself andto his disciples, are marked. V.A. Kitaev worked at Volgograd State University for 16 years. All the while, he headed the Department andwas the dean for the first four years. The main thing is what he wanted in those positions – along with their colleagues was to lay and develop the traditions of the classical university, university atmosphere of the faculty and the university. The major scientific issues that are developed by V.A. Kitaev were: the history of liberalism and the fate of liberal reforms (modernization in Russia, the history of the Russian conservative thought, the problem of revolutionary violence as an inevitable result of the practical realization of socialist ideas. As an advocate of “establishing full-fledged liberal order”, V.A. Kitaev had, in essence, to ascertain: in Russia XIX – early XX century did not yet develop the historical conditions for the triumph of liberal ideas. The weakness and indecision of Russian liberals and their fear of the revolutionary movement, the constant fluctuation between the reform and reaction did not allow them to become independent of the political force that would determine the fate of the country in the end.

  8. Aseismic design of the Heysham II Nuclear Power Station

    International Nuclear Information System (INIS)

    Day, J.W.

    1983-01-01

    A brief description of the seismic criteria established for use with the Steam Generating Heavy Water Reactor (SCHWR) and taken for the Heysham II Project is given. The qualification strategy adopted for Heysham II is described, and a brief overview is given of some of the more important design changes required for seismic purposes on that station

  9. Costs of producing electricity from nuclear, coal-fired and oil-fired power stations

    International Nuclear Information System (INIS)

    1980-07-01

    The Board publishes generation costs per kW h incurred at recently commissioned power stations so that the costs and performance of nuclear and conventional stations of roughly the same date of construction can be compared. The term 'conventional power station' is used to describe coal-fired and oil-fired steam power stations. The Board has now decided: (A) to supplement the past method of calculating costs at main stations commissioned between 1965 and 1977 by giving the associated figures for interest during construction, for research, and for training; (B) to give similar figures for the contemporary stations Hinkley Point B and the first half of Drax, (C) to provide estimates of generating costs of stations under construction; (D) to set out explicitly the relationship of this method of calculation to that employed in taking investment decisions on future stations. In this way the figures for stations in commission and under construction are arrived at more in line with the general principles of evaluating investment proposals. The present document provides this information. (author)

  10. 75 FR 47856 - Nebraska Public Power District: Cooper Nuclear Station; Notice of Availability of the Final...

    Science.gov (United States)

    2010-08-09

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2008-0617] Nebraska Public Power District: Cooper Nuclear Station; Notice of Availability of the Final Supplement 41 to the Generic Environmental... of operating licenses DPR-46 for an additional 20 years of operation for the Cooper Nuclear Station...

  11. Method and device allowing a more rational exploitation of electrical power-stations. [energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Mascarello, J

    1974-04-12

    Description is given of a device permitting a more rational exploitation of electrical power stations characterized by the fact that, while electric power available during slack hours is used for pressurizing air (the pressurized air being stored in tanks), the electric power available during slack days is used for generating hydrogen from water, the hydrogen being stored in other tanks. Combustion of the stored hydrogen by the stored air is used for generating electric power during electric power consumption peak-periods.

  12. Techno-economic assessments of oxy-fuel technology for South African coal-fired power stations

    CSIR Research Space (South Africa)

    Oboirien, BO

    2014-03-01

    Full Text Available at the technical and economic viability of oxy-fuel technology for CO(sub2) capture for South African coal-fired power stations. This study presents a techno-economic analysis for six coal fired power stations in South Africa. Each of these power stations has a...

  13. Using cast-on electroslag technology for manufacturing nuclear power station equipment

    International Nuclear Information System (INIS)

    Rabinovich, V.I.; Borodin, M.A.; Chistyakov, G.A.; Karpov, O.S.; Kriger, Yu.N.

    1984-01-01

    An application of a new electroslag cast-on process for manufacturing nuclear power station equipment is described. This process is compared with a welding process for manufacturing a D /SUB s/ -400-mm gate valve bonnet

  14. The effect of fish impingement at Sizewell 'A' Power Station, Suffolk, on North Sea fish stocks

    International Nuclear Information System (INIS)

    Turnpenny, A.W.H.; Utting, N.J.; Millner, R.S.; Riley, J.D.

    1988-04-01

    Samples collected from the cooling water intake screens of Sizewell 'A' power station over a 12 month period contained 73 species of fish. Of these, only 20 species were present on more than 50% of sampling dates and only 7 commercially exploited species were caught in quantities of more than a few hundred over the year; namely sprat, herring, cod, whiting, sole, dab and plaice. These species formed the basis of analysis of the impact of the Power Station on commercial species. Commercial species found in the Sizewell area are part of major North Sea stocks. The impact of the losses due to the Power Station is spread over these stocks, hence the effect is minimal. The mortality rate caused by the Power Station is one thousandth to one hundred-thousandth, depending on species, of that caused by commercial fishing and the effect is less than that of a small, inefficient commercial trawler. (author)

  15. Saving of drinking water in cooling system at Aq aba Thermal Power Station

    International Nuclear Information System (INIS)

    Al-Nsour, A.F.

    2001-01-01

    This paper discussing a new modification, design and implementation to the existing cooling water system of boiler drum continuous blow down water at Aq aba Thermal Power Stations to eliminate drinking water consumption as a coolant medium

  16. Research on comprehensive decision-making of PV power station connecting system

    Science.gov (United States)

    Zhou, Erxiong; Xin, Chaoshan; Ma, Botao; Cheng, Kai

    2018-04-01

    In allusion to the incomplete indexes system and not making decision on the subjectivity and objectivity of PV power station connecting system, based on the combination of improved Analytic Hierarchy Process (AHP), Criteria Importance Through Intercriteria Correlation (CRITIC) as well as grey correlation degree analysis (GCDA) is comprehensively proposed to select the appropriate system connecting scheme of PV power station. Firstly, indexes of PV power station connecting system are divided the recursion order hierarchy and calculated subjective weight by the improved AHP. Then, CRITIC is adopted to determine the objective weight of each index through the comparison intensity and conflict between indexes. The last the improved GCDA is applied to screen the optimal scheme, so as to, from the subjective and objective angle, select the connecting system. Comprehensive decision of Xinjiang PV power station is conducted and reasonable analysis results are attained. The research results might provide scientific basis for investment decision.

  17. Monitoring of radioactivity in the environs of Finnish nuclear power stations in 1986

    International Nuclear Information System (INIS)

    Ilus, E.; Sjoeblom, K.L.; Aaltonen, H.; Klemola, S.; Arvela, H.

    1987-06-01

    Results of the environmental programmes monitoring radioactivity around the Finnish nuclear power stations in 1986 are reported. After the end of April the fallout nuclides from the Chernobyl accident predominated in all samples taken from the environs of the two power stations Loviisa and Olkiluoto. Radionuclides originating from the Finnish power stations were detected mainly in samples taken from the aquatic environment. The concentrations of the locally discharged nuclides were very low in comparison with the fallout nuclides and their impact on the radiation doses of the population was insignificant. Both nuclear power stations are situated in the main fallout area in Finland. The results of these large monitoring programmes give a good picture of the behaviour of the Chernobyl fallout in the specific areas in Finland

  18. Loss of cooling accident simulation of nuclear power station spent-fuel pool

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.; Liang, K-S., E-mail: mlee@ess.nthu.edu.tw, E-mail: ksliang_1@hotmail.com [National Tsing Hua Univ., Hsinchu, Taiwan (China); Lin, K-Y., E-mail: syrup760914@gmail.com [Taiwan Power Company, Taiwan (China)

    2014-07-01

    The core melt down accident of Fukushima Nuclear Power Station on March 11th, 2011 alerted nuclear industry that the long term loss of cooling of spent fuel pool may need some attention. The target plant analyzed is the Chinshan Nuclear Power Station of Taiwan Power Company. The 3-Dimensional RELAP5 input deck of the spent fuel pool of the station is built. The results indicate that spent fuel of Chinshan Nuclear Power Station is uncovered at 6.75 days after an accident of loss cooling takes place and cladding temperature rises above 2,200{sup o}F around 8 days. The time is about 13 hours earlier than the results predicted using simple energy balance method. The results also show that the impact of Counter Current Flow Limitation (CCFL) and radiation heat transfer model is marginal. (author)

  19. A majority in favour of the construction of further nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The results of an opinion poll of 5000 German-speaking persons in Bern Canton, Switzerland are summarised and commented on. 54% of those questioned expressed approval of further nuclear power station construction in Switzerland. (F.Q.)

  20. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    Science.gov (United States)

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  1. Development of the fuel-cycle costs in nuclear power stations with light-water reactors

    International Nuclear Information System (INIS)

    Brosch, R.; Moraw, G.; Musil, G.; Schneeberger, M.

    1976-01-01

    The authors investigate the fuel-cycle costs in nuclear power stations with light-water reactors in the Federal Republic of Germany in the years 1966 to 1976. They determine the effect of the price development for the individual components of the nuclear fuel cycle on the fuel-cycle costs averaged over the whole power station life. Here account is taken also of inflation rates and the change in the DM/US $ parity. In addition they give the percentage apportionment of the fuel-cycle costs. The authors show that real fuel-cycle costs for nuclear power stations with light-water reactors in the Federal Republic of Germany have risen by 11% between 1966 and 1976. This contradicts the often repeated reproach that fuel costs in nuclear power stations are rising very steeply and are no longer competitive. (orig.) [de

  2. Technical limits on performance reserves and life expectancy in nuclear power stations with light water reactors

    International Nuclear Information System (INIS)

    Wanner, R.; Brosi, S.; Duijvestijn, G.

    1990-01-01

    The safety margin (i.e. the difference between the loads equipment can take and those actually imposed on components) in a reactor pressure vessel is a major factor in the life expectancy of a nuclear power station. This safety margin is reduced considerably by reductions in the toughness of equipment caused by neutron irradiation and growth of cracks. Once the minimum safety margin is infringed, the nuclear power station is at the end of its working life. 13 figs., 11 refs

  3. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  4. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    Energy Technology Data Exchange (ETDEWEB)

    Besson, D.Z., E-mail: zedlam@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Moscow Engineering and Physics Institute, 31 Kashirskaya Highway, Moscow 115409 (Russian Federation); Kennedy, D.M., E-mail: dmkennedy@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Ratzlaff, K., E-mail: ratzlaff@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Young, R., E-mail: rwyoung@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States)

    2014-11-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein.

  5. Electric machinery and drives in thermal power stations. Elektrische Maschinen und Antriebe in thermischen Kraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery.

  6. Approach to reducing the effect of bone—coal power station on radiation environment

    Institute of Scientific and Technical Information of China (English)

    NIShi-Ying; GUPei-Long; 等

    2002-01-01

    The effect of two bone-coal power stations(6MWe) on environment was investigated within the scope of the dose contribution caused by various radionucildes in different ways.It is found that the best measures to reduce the effect of bone-coal power station on radiation environment include to select a fine boiler system and a comprehensive utilization of the bone-coal cinder(BCC),soot and ash in the catchers.

  7. Approach to reducing the effect of bone-coal power station on radiation environment

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    The effect of two bone-coal power stations (6 MWe) on environment wasinvestigated within the scope of the dose contribution caused by various radionucildes in different ways. It is found that the best measures to reduce the effect of bone-coal power station on radiation environment include to select a fine boiler system and a comprehensive utilization of the bone-coal cinder (BCC), soot and ash in the catchers.

  8. Civil engineering in nuclear power stations: design of the turbine building and nuclear auxiliary building

    International Nuclear Information System (INIS)

    Lacroix, R.

    1985-01-01

    After enumerating the specific features of civil engineering in nuclear power stations. One goes on to examine the principal deliberations undertaken with the aim of optimising projects for transition from the P4 to P'4 and then N4 generations of nuclear power stations. The courses of action decided with respect to the design of the machine room and auxiliary equipment building are described [fr

  9. Assesment of Carbon Credits for Power Generation Systems at GSM Base Station Site

    OpenAIRE

    Ani, Vincent Anayochukwu; Ani, Emmanuel Onyeka

    2016-01-01

    Electricity production is often a source of CO2 emissions, for instance when fossil fuel is combusted in power plants. Therefore the root cause of pollution coming from telecommunication industry is the source of energy (diesel genset) the network operators used in running their Base station sites. Energy consumption of using diesel to power base station by telecom networks is a contributor to global greenhouse gas (GHG) emissions. This paper presents the comparative carbon credits of hybrid ...

  10. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    International Nuclear Information System (INIS)

    Besson, D.Z.; Kennedy, D.M.; Ratzlaff, K.; Young, R.

    2014-01-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein

  11. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  12. Some issues on radiological consequences analysis in site selection for nuclear power stations

    International Nuclear Information System (INIS)

    Chen Xiaoqiu; Yue Huiguo

    2006-01-01

    The three considerations, Site safety and environmental protection and emergency preparedness, are the focus of attention in the evaluation of the suitability of a site for nuclear power station. This paper summarized the basic regulatory requirements for the siting of nuclear power station, described the existing problems on radiological consequences analyses during the siting stage and discussed the is- sues that need to concern in the reviewing of the radiological consequences analyses in the siting appraisal stage. (authors)

  13. Training of technical staff for nuclear power station operation

    International Nuclear Information System (INIS)

    Haire, T.P.; Myerscough, P.B.

    1981-01-01

    The statutory training requirements covering the technical staff in the CEGB (Central Electricity Generating Board) are discussed. Details of the training programmes emphasize the importance of the staff having a thorough understanding of the nuclear processes involved in the station operation and not relying solely upon a mechanistic approach to operating procedures. The impact of this philosophy on the design of training simulators is examined and a brief comparison is made with the training philosophies in other countries. (U.K.)

  14. Annual report on nuclear power station operational management, 1984

    International Nuclear Information System (INIS)

    1985-09-01

    As of the end of fiscal year 1984, 28 nuclear power plants were in operation in Japan, the total power output of which was 20.56 million kW, equivalent to 22.9 % of the total generated electric power in Japan. Now nuclear power generation bears a very important role in the stable supply and cost stabilization of electric power. The result of the capacity factor in fiscal year 1984 was 73.9 %, which showed that the nuclear power generation and safety management technologies in Japan are at the top level in the world. However, in order that nuclear power generation accomplishes the role as main power source sufficiently hereafter by increasing the number of plants, the reliability and economical efficiency must be further improved, and especially the safety management and operational management become important. For the purpose, the operational experience accumulated so far must be effectively utilized. In this book, the outline of the administration on the safety regulation of nuclear power generation, the state of operation of nuclear power plants, the state of accidents and failures, the state of regular inspections and so on are summarized. Also the state of radioactive waste management and the radiation control for workers are reported. (Kako, I.)

  15. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  16. Impact of nuclear power station on environment and population

    International Nuclear Information System (INIS)

    Bhide, M.G.

    1991-01-01

    Thermal pollution due to dumping of waste heat in the environment is the direct effect of the fossil-fuel power plants as well as of the nuclear power plants. The indirect effect is the industrial pollution caused by the growth of industries in the surrounding areas. Fossil-fuel power plants cause environmental pollution due to emission of smoke, oxides of sulfur and nitrogen, and carbon dioxide which cause greenhouse effect. Radioactivity generated in nuclear power plants is strictly contained, however in case of accidents it gets released to the environment. (R.G.). 3 refs., 1 appendix

  17. Different scenarios to reduce greenhouse gas emissions of thermal power stations in Canada

    International Nuclear Information System (INIS)

    Zabihian, F.; Fung, A.S.

    2009-01-01

    The purpose of this paper is to examine greenhouse gas (GHG) emission reduction potentials in the Canadian electricity generation sector through fuel switching and the adoption of advanced power generation systems. To achieve this purpose, six different scenarios were introduced. In the first scenario existing power stations' fuel was switched to natural gas. Existing power plants were replaced by natural gas combined cycle (NGCC), integrated gasification combined cycle (IGCC), solid oxide fuel cell (SOFC), hybrid SOFC, and SOFC-IGCC hybrid power stations in scenarios number 2 to 6, respectively. (author)

  18. Design of a photovoltaic central power station: flat-plate array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using fixed flat-panel arrays has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes high-efficiency photovoltaic modules using dendritic web cells. The modules are arranged in 5 MW subfields, each with its own power conditioning unit. The photovoltaic output is connected to the existing 115 kV utility switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  19. Experience in safeguarding nuclear material at the Rheinsberg nuclear power station

    International Nuclear Information System (INIS)

    Winkler, R.

    1976-01-01

    The three years' experience that has been gained in application of the Safeguards Agreement shows that the carrying out of inspections at the nuclear power plant has virtually no effect on operating conditions. In future it will be possible to reduce this effect even further and still maintain the operational reliability of the station. Verification of the transfer of nuclear material and detection of possible violations have proved relatively simple. The labour requirement of each unit at the station for the performance of inspections is not more that thirty man-days. Constructive collaboration between power station staff and inspectors is of great importance in improving the safeguards procedures. (author)

  20. Experimental research of variable rotation speed ICE-based electric power station

    Directory of Open Access Journals (Sweden)

    Dar’enkov Andrey

    2017-01-01

    Full Text Available Developing variable rotation speed ICE-based stand-alone electric power stations which can supply distant regions and autonomous objects with electricity are of scientific interest due to the insufficient study. The relevance of developing such electric power stations is determined by their usage is to provide a significant fuel saving as well as increase ICE motor service life. The article describes the electric station of autonomous objects with improved fuel economy. The article describes multivariate characteristic. Multivariate characteristic shows the optimal frequency of rotation of the internal combustion engine. At this rotational speed there is the greatest fuel economy.