WorldWideScience

Sample records for vla upgrade project

  1. CMS pixel upgrade project

    CERN Document Server

    Kaestli, Hans-Christian

    2010-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7~TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  2. CMS pixel upgrade project

    CERN Document Server

    INSPIRE-00575876

    2011-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7 TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  3. The Atlas upgrade project

    International Nuclear Information System (INIS)

    Bollinger, L.M.

    1988-01-01

    ATLAS is a heavy-ion accelerator system consisting of a 9-MV tandem electrostatic injector coupled to a superconducting linac. A project now well advanced will upgrade the capabilities of ATLAS immensely by replacing the tandem and its negative-ion source with a positive-ion injector that consists of an electron-cyclotron resonance (ECR) ion source and a 12-MV superconducting injector linac of novel design. This project will increase the beam intensity 100 fold and will extend the projectile-mass range up to uranium. Phase 1 of the work, which is nearing completion in late 1988, will provide an injector comprising the ECR source and its 350-kV voltage platform, beam analysis and bunching systems, beam lines, and a prototype 3-MV linac. The ECR source and its voltage platform are operational, development of the new class of low-frequency interdigital superconducting resonators required for the injector linac has been completed, and assembly of the whole system is in progress. Test runs and then routine use of the Phase 1 injector systems are planned for early 1989, and the final 12-MV injector linac will be commissioned in 1990. 12 refs., 6 figs

  4. Superhilac upgrade project

    International Nuclear Information System (INIS)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10 7 to 5 x 10 7 ions/pulse, allowing accurate Lamb shift measurements to be made in U 90+ and U 91+ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown

  5. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  6. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  7. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  8. The Kyoto University tandem upgrading project

    International Nuclear Information System (INIS)

    Nakamura, Masanobu; Shimoura, Susumu; Takimoto, Kiyohiko; Sakaguchi, Harutaka; Kobayashi, Shinsaku

    1988-01-01

    A brief description on the Kyoto University tandem upgrading project. The project consists of replacing the old 5 MV tandem Van de Graaff by an 8UDH pelletron. The old pressure vessel and beam lines are used again without significant modification. The project is planned to be completed at the end of 1989. (orig.)

  9. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  10. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  11. CDF End Plug calorimeter Upgrade Project

    International Nuclear Information System (INIS)

    Apollinari, G.; de Barbaro, P.; Mishina, M.

    1994-01-01

    We report on the status of the CDF End Plug Upgrade Project. In this project, the CDF calorimeters in the end plug and the forward regions will be replaced by a single scintillator based calorimeter. After an extensive R ampersand D effort on the tile/fiber calorimetry, we have now advanced to a construction phase. We review the results of the R ampersand D leading to the final design of the calorimeters and the development of tooling devised for this project. The quality control program of the production of the electromagnetic and hadronic calorimeters is described. A shower maximum detector for the measurement of the shower centroid and the shower profile of electrons, γ and π 0 has been designed. Its performance requirements, R ampersand D results and mechanical design are discussed

  12. LHC Injectors Upgrade (LIU) Project at CERN

    CERN Document Server

    Shaposhnikova, Elena; Damerau, Heiko; Funken, Anne; Gilardoni, Simone; Goddard, Brennan; Hanke, Klaus; Kobzeva, Lelyzaveta; Lombardi, Alessandra; Manglunki, Django; Mataguez, Simon; Meddahi, Malika; Mikulec, Bettina; Rumolo, Giovanni; Scrivens, Richard; Vretenar, Maurizio

    2016-01-01

    A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LI...

  13. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  14. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  15. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  16. Project W-030 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventilation system upgrade under Project W-030, and recommends acceptance of the system as constructed, based on a review of supporting documentation

  17. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  18. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  19. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  20. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  1. Visual Landing Aids (VLA) Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Visual Landing Aids (VLA) Laboratory serves to support fleet VLA systems by maintaining the latest service change configuration of currently deployed VLA...

  2. The VLA Sky Survey

    Science.gov (United States)

    Lacy, Mark; VLASS Survey Team, VLASS Survey Science Group

    2018-01-01

    The VLA Sky Survey (VLASS), which began in September 2017, is a seven year project to image the entire sky north of Declination -40 degrees in three epochs. The survey is being carried out in I,Q and U polarization at a frequency of 2-4GHz, and a resolution of 2.5 arcseconds, with each epoch being separated by 32 months. Raw data from the survey, along with basic "quicklook" images are made freely available shortly after observation. Within a few months, NRAO will begin making available further basic data products, including refined images and source lists. In this talk I shall describe the science goals and methodology of the survey, the current survey status, and some early results, along with plans for collaborations with external groups to produce enhanced, high level data products.

  3. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  4. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  5. Hazard categorization of K Basin water filtration upgrade project

    International Nuclear Information System (INIS)

    Conn, K.R.

    1995-01-01

    This supporting document provides the hazards categorization for the K Basin Water Filtration Upgrade Project at K East. All activities associated with the project are less than Hazard Category 3, except for the handling of the ECO-ROK liners containing spent filter cartridges. All activities involving the handling of liners, containing spent cartridges, by monorail, forklift or mobile crane are classified as Hazard Category 3

  6. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  7. SPEAR 3 Upgrade Project: The Final Year

    International Nuclear Information System (INIS)

    Hettel, R

    2004-01-01

    During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed

  8. Reference moderator calculated performance for the LANSCE upgrade project

    International Nuclear Information System (INIS)

    Ferguson, P.D.; Russell, G.J.; Pitcher, E.J.

    1995-01-01

    The authors have calculated the performance of five moderators of interest to the LANSCE upgrade project. Coupled and decoupled light water and liquid hydrogen moderators in flux-trap geometry surrounded by a neutronically infinite heavy-water cooled beryllium reflector have been studied. Time and energy spectra, as well as semi-empirical fits to the data, are presented. The data has been made available to aid the instrument design and moderator selection process

  9. Full scope upgrade project for the Fermi 2 simulator

    International Nuclear Information System (INIS)

    Bollacasa, D.; Gonsalves, J.B.; Newcomb, P.C.

    1994-01-01

    The Detroit Edison company (DECO) concentrated the Simulation Division of Asea Brown Boveri (ABB) to perform a full scope upgrade of the Fermi 2 simulator. The Fermi 2 plant is a BWR 6 generation Nuclear Steam Supply System (NSSS). The project included the complete replacement of the existing simulation model sofware with ABB's high fidelity BWR models, addition of an advanced instructor station facility and new simulation computers. Also provided on the project were ABB's advanced simulation environment (CETRAN), a comprehensive configuration management system based on a modern relational database system and a new computer interface to the input/output system. (8 refs., 2 figs.)

  10. ngVLA Cryogenic Subsystem Concept

    Science.gov (United States)

    Wootten, Al; Urbain, Denis; Grammer, Wes; Durand, S.

    2018-01-01

    The VLA’s success over 35 years of operations stems in part from dramatically upgraded components over the years. The time has come to build a new array to lead the radio astronomical science into its next 40 years. To accomplish that, a next generation VLA (ngVLA) is envisioned to have 214 antennas with diameters of 18m. The core of the array will be centered at the current VLA location, but the arms will extend out to 1000km.The VLA cryogenic subsystem equipment and technology have remained virtually unchanged since the early 1980s. While adequate for a 27-antenna array, scaling the current system for an array of 214 antennas would be prohibitively expensive in terms of operating cost and maintenance. The overall goal is to limit operating cost to within three times the current level, despite having 8 times the number of antennas. To help realize this goal, broadband receivers and compact feeds will be utilized to reduce both the size and number of cryostats required. The current baseline front end concept calls for just two moderately-sized cryostats for the entire 1.2-116 GHz frequency range, as opposed to 8 in the VLA.For the ngVLA cryogenics, our objective is a well-optimized and efficient system that uses state-of-the-art technology to minimize per-antenna power consumption and maximize reliability. Application of modern technologies, such as variable-speed operation for the scroll compressors and cryocooler motor drives, allow the cooling capacity of the system to be dynamically matched to thermal loading in each cryostat. Significantly, power savings may be realized while the maintenance interval of the cryocoolers is also extended.Finally, a receiver designed to minimize thermal loading can produce savings directly translating to lower operating cost when variable-speed drives are used. Multi-layer insulation (MLI) on radiation shields and improved IR filters on feed windows can significantly reduce heat loading.Measurements done on existing cryogenic

  11. New Upgrade Project for the Photon Factory Storage Ring

    International Nuclear Information System (INIS)

    Asaoka, S.; Haga, K.; Harada, K.; Honda, T.; Hori, Y.; Izawa, M.; Kasuga, T.; Kobayashi, M.; Kobayashi, Y.; Maezawa, H.; Minagawa, Y.; Mishina, A.; Mitsuhashi, T.; Miyajima, T.; Miyauchi, H.; Nagahashi, S.; Nogami, T.; Obina, T.; Pak, C. O.; Sakanaka, S.

    2004-01-01

    A new project for upgrading the 2.5-GeV Photon Factory (PF) storage ring is now being undertaken to create six new short-straight sections and to lengthen the existing eight straight sections. The short-straight sections will provide an opportunity to install short-period narrow-gap undulators, while the extensions of existing straight sections will be taken advantage of updating current insertion devices to the latest models in future. To this end, the lattice configuration around the straight sections is modified by replacing old quadrupole magnets with new shorter ones and placing them closer to the near-by bending magnets. Necessary replacement of the vacuum ducts and the beamline front ends will be carried out together. This project will be completed by the end of September, 2005, after six months of shutdown

  12. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  13. Science Ready Data Products and the ngVLA

    Science.gov (United States)

    Kern, Jeffrey

    2018-01-01

    With angular resolution comparable to ALMA and future ELTs, the ngVLA will be the centimeter wavelength instrument contributing to multi-wavelength astronomy throughout the next decades. To maximize the impact of the ngVLA it is important that it be a facility available to all astronomers, not only to those who consider themselves radio astronomers. Building on the successes of the ALMA and VLA pipelines NRAO has undertaken a multi-year project to provide science ready products to the users of our telescopes and archive. The SRDP initiative addresses one of the technical risk areas of the ngVLA, and demonstrates the Observatories ability to deliver this critical functionality. The SRDP project is currently refining and reviewing the technical and scientific requirements for the existing NRAO telescopes. Capabilities will be made available to the community as they are developed and mature. As the project progresses, a rich archive of science quality radio images from both ALMA and the VLA will be provided to the astronomical community. The current status, concepts, and plans for the SRDP project are presented, as are the implications for the ngVLA facility.

  14. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    Energy Technology Data Exchange (ETDEWEB)

    HAMMERS, J.S.

    1999-07-21

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.

  15. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades

  16. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  17. Upgrading of oil palm wastes by radiation processing - project review

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    1998-01-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisation dose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  18. Upgrading of oil palm wastes by radiation processing - project review

    Energy Technology Data Exchange (ETDEWEB)

    Alang Md Rashid, Nahrul Khair [Malaysian Institute for Nuclear Technology Research (MINT), Bangi (Malaysia)

    1998-07-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisationdose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  19. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  20. Seismic review of vault for MFTF upgrade project

    International Nuclear Information System (INIS)

    Franklin, H.A.

    1983-01-01

    This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (α + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (α + T) conditions, and recommendations for future work

  1. The VLA Low-band Ionosphere and Transient Experiment (VLITE)

    Science.gov (United States)

    Clarke, Tracy; Peters, Wendy; Brisken, Walter; Giacintucci, Simona; Kassim, Namir; Polisensky, Emil; Helmboldt, Joseph; Richards, Emily E.; Erickson, Alan; Ray, Paul S.; Kerr, Matthew T.; Deneva, Julia; Coburn, William; Huber, Robert; Long, Jeff

    2018-01-01

    The VLA Low-band Ionosphere and Transient Experiment (VLITE, http://vlite.nrao.edu/ ) is a commensal low-frequency observing system that has been operational on the National Radio Astronomy Observatory's Karl G. Jansky Very Large Array (VLA) since late 2014. The separate optical paths of the prime-focus sub-GHz dipole feeds and the Cassegrain-focus 1-50 GHz feeds allow both systems to operate simultaneously with independent correlators. The initial 2.5 years of VLITE operation provided real-time correlation of 10 antennas across the 320-384 MHz band with a total observing time approaching 12,000 hours. During the summer of 2017, VLITE was upgraded to a total of 16 antennas (more than doubling the number of baselines) with enhanced correlator capabilities to enable correlation of the on-the-fly observing mode being used for the new NRAO VLA Sky Survey (VLASS).We present an overview of the VLITE system, including highlights of the complexities of a commensal observing program, sparse-array challenges, and scientific capabilities from our science-ready data pipeline. In the longer term, we seek a path to broadband expansion across all VLA antennas to develop a powerful new LOw Band Observatory (LOBO).

  2. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  3. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  4. VLA Reveals a Close Pair of Potential Planetary Systems

    Science.gov (United States)

    1998-09-01

    blocks of planets. Until 1993, however, the VLA could not do so because it had no receivers that worked at the required wavelength, 7 mm. Rodriguez, an experienced VLA observer interested in how planetary systems form, obtained a $1 million grant in 1992 from Mexico's National Science and Technology Foundation (Spanish acronym CONACyT) to allow the National Radio Astronomy Observatory (NRAO) to build such receivers for 13 of the VLA's 27 230-ton dish antennas. Those receivers were built and installed in 1993 and 1994, and now are used by numerous observers, including Rodriguez. With these receivers, the VLA images show 10 times more detail than any previous observations at these wavelengths. "This research proves how valuable these receivers are in increasing the scientific capability of the VLA," said Miller Goss, NRAO's director of VLA operations. "In fact, this type of work is one reason the U.S. National Science Foundation is providing the money to equip the rest of the VLA's antennas with the same kind of receivers." The additional receivers will greatly improve the quality of images for complex objects, including planetary systems in formation, said NRAO astronomer Rick Perley. "We plan a major upgrade to all aspects of the VLA in the next few years," Perley said. "The VLA upgrade will mean that astronomers using this wavelength can find about 60 times more objects of any particular type and make better images of them. That improves the chances of finding rare objects, which often are the signposts pointing to new insights into physics." The VLA is an instrument of the National Radio Astronomy Observatory, a facility of the National Science Foundation, operated under cooperative agreement by Associated Universities, Inc.

  5. The VLA Sky Survey (VLASS): Overview and First Results

    Science.gov (United States)

    Myers, Steven T.; VLASS Survey Team, Survey Science Group (SSG)

    2018-01-01

    The VLA Sky Survey (VLASS) is a 5520 hour spectropolarimetric synoptic survey covering the 33885 square degrees of the sky above Declination -40 degrees from 2-4 GHz at 2.5" angular resolution using the upgraded Karl G. Jansky Very Large Array (VLA). Over the survey duration of 7 years, each area of the sky will be covered in 3 epochs spaced 32 months apart, to a projected depth of 0.12mJy/beam rms noise per epoch and 0.07mJy/beam for 3 epochs combined. The VLASS employs on-the-fly mosaicking (OTFM) to rapidly scan the sky with a net speed of approximately 20 sq. degrees per hour. The high-level science goals for the survey include the identification and precise location of radio transients, the measurement of magnetic fields in our galaxy and beyond, and the study of radio emission from galaxies and active galactic nuclei throughout the Universe. The ability of the VLASS to see through dust allows us to unveil phenomena such as hidden cosmic explosions, emission from deep within our galaxy, and supermassive black holes buried within host galaxies.The VLASS was proposed in 2014 by our community-led Survey Science Group (SSG). VLASS Pilot observations were taken in mid-2016, and the first epoch covering half the area (VLASS1.1) commenced in September 2017. The raw data from the VLASS are available in the NRAO archive immediately with no proprietary period. The Basic Data Products (BDP) that will be produced by the survey team are public and will additionally include: calibrated visibility data, quick-look continuum images (with a goal of posting to the archive within 1 week of observation), single-epoch and cumulative combined-epoch images, spectral image cubes, and basic object catalogs. Single-epoch and cumulative images are in intensity and linear polarization (Stokes IQU). In addition to the BDP provided by NRAO and served through the NRAO archive, there are plans for Enhanced Data Products and Services to be provided by the community in partnership with the

  6. Design and planning of the Henderson Mine ventilation upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Loring, D.M.; Shea, N.A. [Climax Molybdenum Co., Henderson Operations, Empire, CO (United States)

    2010-07-01

    The average molybdenum ore throughput at the Henderson Mine near Denver, Colorado increased significantly between 2003 and 2007. In response, the Climax Molybdenum Company updated the life-of-mine plan which resulted in significant changes to the ventilation requirements of the mine. This paper outlined the mine and ventilation planning efforts. The design options that were evaluated to upgrade the ventilation system were also described along with the final design that was chosen to support the updated mine plan. The mine uses an exhaust ventilation system in which ventilation is supplied through a service shaft, an intake shaft and a long ore haulage tunnel. Currently, air is exhausted through 2 exhaust shafts. The new reserve model that was completed in 2007 incorporated updated geologic information and mix/dilution models. An evaluation of the new life-of-mine plans and production sequences drove the development of a new ventilation plan that increased the airflow requirements of the mine. The primary design concerns were radon control; reduction of diesel particulate matter; silica dust; blasting and other gases; and climate control. Ventilation requirements were also updated based on the final exposure limits stipulated in the 2008 regulations of the Mine Safety and Health Administration. 4 refs., 11 tabs., 8 figs.

  7. ATLAS 10 GHz electron cyclotron resonance ion source upgrade project

    CERN Document Server

    Moehs, D P; Pardo, R C; Xie, D

    2000-01-01

    A major upgrade of the first ATLAS 10 GHz electron cyclotron resonance (ECR) ion source, which began operations in 1987, is in the planning and procurement phase. The new design will convert the old two-stage source into a single-stage source with an electron donor disk and high gradient magnetic field that preserves radial access for solid material feeds and pumping of the plasma chamber. The new magnetic-field profile allows for the possibility of a second ECR zone at a frequency of 14 GHz. An open hexapole configuration, using a high-energy-product Nd-Fe-B magnet material, having an inner diameter of 8.8 cm and pole gaps of 2.4 cm, has been adopted. Models indicate that the field strengths at the chamber wall, 4 cm in radius, will be 9.3 kG along the magnet poles and 5.6 kG along the pole gaps. The individual magnet bars will be housed in austenitic stainless steel, allowing the magnet housing within the aluminum plasma chamber to be used as a water channel for direct cooling of the magnets. Eight solenoid...

  8. Optics and lattice optimizations for the LHC upgrade project

    CERN Document Server

    Holzer, B; Chance, A; Dalena, B; Payet, J; Bogomyagkov, A; Appleby, R; Korostelev, M; Hock, K; Wolski, A; Milardi, C; Faus-Golfe, A; Resta, J

    2012-01-01

    The luminosity upgrade of the LHC collider at CERN is based on a strong focusing scheme to reach lowest values of the beta function at the collision points. Several issues have to be addressed in this context, that are considered as mid term goals for the optimisation of the lattice and beam optics: Firstly a number of beam optics have been developed to establish a baseline for the hardware R&D, and that will define the specifications for the new magnets that will be needed, in Nb$_{3}$Sn as well as in NbTi technology. Secondly, the need for sufficient flexibility of the beam optics especially for smallest β * values, the need for a smooth transition between the injection and the collision optics, the comparison of the optics performance between flat and round beams and finally different ways to optimise the chromatic correction, including the study of local correction schemes. This paper presents the status of this work, which is a result of an international collaboration, and summarises the main parame...

  9. Managing RTP Console Upgrading Project: Best Practice for Nuclear Malaysia as TSO in Supporting NPP Development

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Syahirah Abdul Rahman; Izhar Abu Hussin

    2011-01-01

    Human Resource Development (HRD) is required for Nuclear Power Programme (NPP). To be a Technical Support Organisation (TSO) for NPP, Nuclear Malaysia should be ready to take the responsibility in supporting Nuclear Regulatory Agency (NRA) and NPP Operators. In nurturing Nuclear Malaysia as TSO, the prime important and focus of HRD for the NPP is the reactor engineering technology. Nuclear Malaysia gives various phases of supports needed to build NPP such as during siting, design, planning, licensing, construction, commissioning, operation and maintenance in its own way and capability. The current Nuclear Malaysia unique approach is the TRIGA PUSPATI reactor (RTP) upgrading project. Research reactor plays an important role in Research and Developpement organization as a nuclear facility to assist the development of NPP. Therefore, upgrading the research reactor is needed to build the skills and gain knowledge of workers to work safely. After 29 years of operation, the RTP system is facing aging problems due to many components in the reactor are outdated. Therefore, immediate action should be carried out to mitigate the aging factor of the reactor to prevent the worsening of the aging problem, and to prevent untoward incident from happening. Action should also cover short and long term planning to prevent current situation from recurring. Currently, RTP is upgrading its console from analog to digital system. One of the achievements in this console upgrading project is the development and implementation of project management. This paper comprises the overview on the RTP console upgrading project, the project management and how this project can lead Nuclear Malaysia to be a good TSO for the development of NPP. (author)

  10. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  11. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  12. Upgrade Uranium Recovery Project No. 34110: final safety analysis report

    International Nuclear Information System (INIS)

    1981-09-01

    The accident analysis of the upgrade uranium recovery system indicated three potential hazards: (1) criticality, (2) toxic fumes from nitric acid solutions, and (3) release of toxic uranyl nitrate solutions. Any of these are capable of causing the death of one or more employees; therefore, they form the basis for the residual risks identified below. The analysis found no hazardous energies or substances capable of causing irreversible injury to, or the death of, any members of the public. The following residual risks will be controlled administratively by procedural constraints: An operator or maintenance error will cause 235 U to be transferred into an unsafe container and cause a criticality. An operator or maintenance error will cause containers of 235 U bearing material to be improperly spaced and cause a criticality. Extensive corrosion will cause a hole to form in a calciner tube, the corrosion will go undetected, and a criticality will result, and a loss of system and/or building solution containment will occur concurrent with a drain being open resulting in a criticality and/or release of toxic material. Additional residual risks that have a small probability are that an earthquake or tornado will affect the building, alter the system geometry, and initiate a criticality; that the compressed-gas (nitrogen) cylinder valve will be sheared off, become airborne, and alter the system geometry; and that loss of system and/or building solution containment may occur concurrently with fire sprinkler system actuation causing a criticality and/or release of toxic material. The following residual risks will be addressed in the Safety Study of the existing X-705 Building: that a spill of raffinate highly contaminated with 99 Tc will occur due to operator error or incorrect lab analysis and that a gaseous or liquid effluent release of small amounts of transuranic elements will occur

  13. Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control Systemm (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1994-08-01

    The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable

  14. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D project

    International Nuclear Information System (INIS)

    Casse, G

    2014-01-01

    The ATLAS upgrade Planar Pixel Sensors (PPS) project aims to prove the suitability of silicon detectors processed with planar technology to equip all layers of the pixel vertex detector proposed for the upgrade of the ATLAS experiment for the future High Luminosity LHC at CERN (HL-LHC). The detectors need to be radiation tolerant to the extreme fluences expected to be received during the experimental lifetime, with optimised geometry for full coverage and high granularity and affordable in term of cost, due to the relatively large area of the upgraded ATLAS detector system. Here several solutions for the detector geometry and results with radiation hard technologies (n-in-n, n-in-p) are discussed

  15. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  16. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  17. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  18. Software and man-machine interface considerations for a nuclear plant computer replacement and upgrade project

    International Nuclear Information System (INIS)

    Diamond, G.; Robinson, E.

    1984-01-01

    Some of the key software functions and Man-Machine Interface considerations in a computer replacement and upgrade project for a nuclear power plant are described. The project involves the installation of two separate computer systems: an Emergency Response Facilities Computer System (ERFCS) and a Plant Process Computer System (PPCS). These systems employ state-of-the-art computer hardware and software. The ERFCS is a new system intended to provide enhanced functions to meet NRC post-TMI guidelines. The PPCS is intended to replace and upgrade an existing obsolete plant computer system. A general overview of the hardware and software aspects of the replacement and upgrade is presented. The work done to develop the upgraded Man-Machine Interface is described. For the ERFCS, a detailed discussion is presented of the work done to develop logic to evaluate the readiness and performance of safety systems and their supporting functions. The Man-Machine Interface considerations of reporting readiness and performance to the operator are discussed. Finally, the considerations involved in the implementation of this logic in real-time software are discussed.. For the PPCS, a detailed discussion is presented of some new features

  19. Superconducting link bus design for the accelerator project for upgrade of LHC

    International Nuclear Information System (INIS)

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.

    2011-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  20. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  1. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  2. VLA observations of Cepheid variables

    International Nuclear Information System (INIS)

    Welch, D.L.; Duric, N.

    1988-01-01

    The 3-sigma, 5 GHz flux-density upper limits between 120 and 180 microJy have been obtained for the classical Cepheids FF Aql, Eta Aql, SU Cas, Delta Cep, and T Mon, and the Type II Cepheids CS Cas and SW Tau using the VLA. On the basis of assumptions outlined in the main text, upper limits for the ionized mass-loss rates of order 10 to the -9th to 10 to the -7th solar masses/yr are derived for these stars. 13 references

  3. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1993-94. OER Report.

    Science.gov (United States)

    Greene, Judy

    Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…

  4. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    International Nuclear Information System (INIS)

    Hookfin, J.D.

    1995-01-01

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades

  5. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  6. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1992-93. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…

  7. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  8. DIII-D UPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003

    International Nuclear Information System (INIS)

    STAMBAUGH, RD

    2003-01-01

    OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program

  9. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    Directory of Open Access Journals (Sweden)

    Leontsinis S.

    2016-01-01

    Full Text Available The ATLAS collaboration has chosen the Micromegas technology along with the small-strip Thin Gap Chambers for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel upgrade project. It will employ eight layers of Micromegas and eight layers of small-strip Thin Gap Chambers per wheel. The New Small Wheel project requires fully efficient Micromegas chambers, able to cope with the maximum expected rate of 15 kHz/cm2 featuring single plane spatial resolution better than 100 μm. The Micromegas detectors will cover a total active area of ~ 1200 m2 and will be operated in a moderate magnetic field (≤ 0.3 T. Moreover, together with their precise tracking capability the New Small Wheel Micromegas chambers will contribute to the ATLAS Level-1 trigger system. Several studies have been performed on small (10 × 10 cm2 and medium (1 × 0.5 m2 size prototypes using medium (1 − 5 GeV/c and high momentum (120 – 150 GeV/c hadron beams at CERN. A brief overview of the results obtained is presented.

  10. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00349891; The ATLAS collaboration; Leontsinis, Stefanos

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  11. European dimension of the implementation of the IAEA TC model project 'Upgrading radiation protection infrastructure'

    International Nuclear Information System (INIS)

    Sabol, J.

    2001-01-01

    A comprehensive evaluation carried out by the IAEA during the period 1984-1995 showed that eleven countries in Europe -- Albania, Armenia, Belarus, Bosnia and Herzegovina, Cyprus, Estonia, Georgia, Latvia, Lithuania, the Republic of Moldova, The Former Yugoslav Republic (TFYR) of Macedonia -- did not have a satisfactory system for radiation protection and the safety of radiation sources in accordance with the recommended international requirements. During the past four years, these countries have been participating in a Model Project aimed at upgrading radiation protection infrastructure in the Europe region with special emphasis on the establishment of an effective legal framework for adequate regulatory control of radiation sources and facilities. This paper analyses the results accomplished in the implementation of this project. It presents the main objectives, based on the present achievements for a follow-up programme to be carried out in participating and also in some other Member States with insufficient national infrastructures for assuring adequate safety in nuclear and radiation technologies. (author)

  12. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  13. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-01-01

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  14. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  15. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  16. A human reliability assessment screening method for the NRU upgrade project

    International Nuclear Information System (INIS)

    Bremner, F.M.; Alsop, C.J.

    1997-01-01

    The National Research Universal (NRU) reactor is a 130MW, low pressure, heavy water cooled and moderated research reactor. The reactor is used for research, both in support of Canada's CANDU development program, and for a wide variety of other research applications. In addition, NRU plays an important part in the production of medical isotopes, e.g., generating 80% of worldwide supplies of Molybdenum-99. NRU is owned and operated by Atomic Energy of Canada Ltd. (AECL), and is currently undergoing upgrading as part of AECL's continuing commitment to operate their facilities in a safe manner. As part of these upgrades both deterministic and probabilistic safety assessments are being carried out. It was recognized that the assignment of Human Error Probabilities (HEPs) is an important part of the Probabilistic Safety Assessment (PSA) studies, particularly for a facility whose design predates modern ergonomic practices, and which will undergo a series of backfitted modifications whilst continuing to operate. A simple Human Reliability Assessment (HRA) screening method, looking at both pre- and post-accident errors, was used in the initial safety studies. However, following review of this method within AECL and externally by the regulator, it was judged that benefits could be gained for future error reduction by including additional features, as later described in this document. The HRA development project consisted of several stages; needs analysis, literature review, development of method (including testing and evaluation), and implementation. This paper discusses each of these stages in further detail. (author)

  17. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    International Nuclear Information System (INIS)

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D ampersand D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project's open-quotes Waste Minimization/Pollution Prevention Strategic Plan.close quotes

  18. Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Doose, C.; Dejus, R.; Jaski, M.; Jansma, W.; Collins, J.; Donnelly, A.; Liu, J.; Cease, H.; Decker, G.; Jain, A.; DiMarco, J.

    2017-06-01

    Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

  19. Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Brajuskovic, B.; Carter, J.; Cease, H.; Lill, R.; Navrotski, G.; Noonan, J.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.; Sangroula, M.

    2016-01-01

    A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

  20. Implementation of knowledge management approach in project oriented activities. Experience from simulator upgrade project

    International Nuclear Information System (INIS)

    Pironkov, L.

    2010-01-01

    Project specifics: Replacement of analogue process control system with Ovation®based Distributed Control System; Hybrid solution with simulated I&C logic and stimulated Human Machine Interface; Initial design ‐“turn‐key” project based on standard relationship “single customer –single contractor

  1. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  2. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  3. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    Huber, T.E.

    1995-01-01

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  4. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D Project

    International Nuclear Information System (INIS)

    George, M

    2014-01-01

    After the foreseen upgrade of the LHC towards the HL-LHC, coming along with higher beam energies and increased peak luminosities, the experiments have to upgrade their detector systems to cope with the expected higher occupancies and radiation damages. In case of the ATLAS experiment a new Inner Tracker will be installed in this context. The ATLAS Planar Pixel Sensor R and D Project (PPS) is investigating the possibilities to cope with these new requirements, using planar pixel silicon sensors, working in a collaboration of 17 institutions and more than 80 scientists. Since the new Inner Tracker is supposed to have an active area on the order of 8 m 2 on the one side and has to withstand extreme irradiation on the other side, the PPS community is working on several approaches to reduce production costs, while increasing the radiation tolerance of the sensors. Another challenge is to produce sensors in such large quantities. During the production of the Insertable b-Layer (IBL) modules, the PPS community has proven to be able to produce a large scale production of planar silicon sensors with a high yield. For cost reduction reasons, it is desirable to produce larger sensors. There the PPS community is working on so called quad- and hex-modules, which have a size of four, respectively six FE-I4 readout chips. To cope with smaller radii and strict material budget requirements for the new pixel layers, developments towards sensors with small inactive areas are in the focus of research. Different production techniques, which even allow the production of sensors with active edges, have been investigated and the designs were qualified using lab and testbeam measurements. The short distance between the new innermost pixel layers and the interaction point, combined with the increase in luminosity, requires designs which are more radiation tolerant. Since charge collection on the one hand decreases with irradiation and on the other hand is not uniform within the pixel cells

  5. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  6. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  7. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  8. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  9. Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

    Energy Technology Data Exchange (ETDEWEB)

    Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis; Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis

    2016-09-01

    Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

  10. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Billett, B.; Brajuskovic, B.; Carter, J.; Kirkus, E.; Lale, M.; Lerch, J.; Noonan, J.; O' Neill, M.; Rocke, B.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  11. Upgrade of the radio frequency quadrupole cooler and buncher for the HIE-ISOLDE project

    CERN Document Server

    Babcock, Carla

    2013-01-01

    The upgrade to the ISOLDE facility, HIE-ISOLDE, will include an upgrade to the RFQCB (radio frequency quadrupole cooler and buncher), the focus of which will be fixing the problems of alignment with the current machine, improving the integrity of the vacuum system, stabilizing the internal gas pressure, and the changes associated with a new position. The beam passage inside the RFQCB has been simulated with an independent code to highlight the importance of the internal gas pressure, to motivate design changes in the new RFQCB and to explain ways to improve the performance of the current machine. The suspected misalignment of ISCOOL has been quantified, and, using a simulation of ions passing through the external injection electrodes, the effect of the misalignment on machine acceptance has been detailed. Plans for the future RFQCB test stand and HIE-ISOLDE installation have been outlined. (C) 2013 Elsevier B.V. All rights reserved.

  12. Radiation hardness of two CMOS prototypes for the ATLAS HL-LHC upgrade project

    CERN Document Server

    Huffman, B T; Arndt, K; Bates, R; Benoit, M; Di Bello, F; Blue, A; Bortoletto, D; Buckland, M; Buttar, C; Caragiulo, P; Das, D; Dopke, J; Dragone, A; Ehrler, F; Fadeyev, V; Galloway, Z; Grabas, H; Gregor, I M; Grenier, P; Grillo, A; Hoeferkamp, M; Hommels, L B A; John, J; Kanisauskas, K; Kenney, C; Kramberger, J; Liang, Z; Mandic, I; Maneuski, D; Martinez-McKinney, F; McMahon, S; Meng, L; Mikuž, M; Muenstermann, D; Nickerson, R; Peric, I; Phillips, P; Plackett, R; Rubbo, F; Segal, J; Seidel, S; Seiden, A; Shipsey, I; Song, W; Stanitzki, M; Su, D; Tamma, C; Turchetta, R; Vigani, L; olk, J; Wang, R; Warren, M; Wilson, F; Worm, S; Xiu, Q; Zhang, J; Zhu, H

    2016-01-01

    The LHC luminosity upgrade, known as the High Luminosity LHC (HL-LHC), will require the replacement of the existing silicon strip tracker and the transistion radiation tracker. Although a baseline design for this tracker exists the ATLAS collaboration and other non-ATLAS groups are exploring the feasibility of using CMOS Monolithic Active Pixel Sensors (MAPS) which would be arranged in a strip-like fashion and would take advantage of the service and support structure already being developed for the upgrade. Two test devices made with theAMSH35 process (a High voltage or HV CMOS process) have been subjected to various radiation environments and have performed well. The results of these tests are presented in this paper.

  13. Spin-orbit maps and electron spin dynamics for the luminosity upgrade project at HERA

    International Nuclear Information System (INIS)

    Berglund, G.Z.M.

    2001-09-01

    HERA is the high energy electron(positron)-proton collider at deutsches elektronen-synchrotron (DESY) in Hamburg. Following eight years of successful running, five of which were with a longitudinally spin polarized electron(positron) beam for the HERMES experiment, the rings have now been modified to increase the luminosity by a factor of about five and spin rotators have been installed for the H1 and ZEUS experiments. The modifications involve nonstandard configurations of overlapping magnetic fields and other aspects which have profound implications for the polarization. This thesis addresses the problem of calculating the polarization in the upgraded machine and the measures needed to maintain the polarization. A central topic is the construction of realistic spin-orbit transport maps for the regions of overlapping fields and their implementation in existing software. This is the first time that calculations with such fields have been possible. Using the upgraded software, calculations are presented for the polarization that can be expected in the upgraded machine and an analysis is made of the contributions to depolarization from the various parts of the machine. It is concluded that about 50% polarization should be possible. The key issues for tuning the machine are discussed. The last chapter deals with a separate topic, namely how to exploit a simple unitary model of spin motion to describe electron depolarization and thereby expose a misconception appearing in the literature. (orig.)

  14. submitter Development of the readout for the IBL upgrade project of the ATLAS Pixel Detector

    CERN Document Server

    Krieger, Nina

    The LHC luminosity is upgraded in several phases until 2022. The resulting higher occupancy degrades the detector performance of the current Pixel Detector. To provide a good performance during the LHC luminosity upgrade, a fourth pixel layer is inserted into the existing ATLAS Pixel Detector. A new FE-I4 readout chip and a new data acquisition chain are required to cope with the higher track rate and the resulting increased bandwidth. Among others, this includes a new readout board: the IBL ROD. One component of this board is the DSP which creates commands for the FE-I4 chip and has to be upgraded as well. In this thesis, the first tests of the IBL ROD prototype are presented. A correct communication of the DSP to its external memory is verified. Moreover, the implementations for an IBL DSP code are described and tested. This includes the first configuration of the FE-I4 with an IBL ROD. In addition, a working communication with the Histogrammer SDRAM and the Input FIFO on the IBL ROD are demonstrated.

  15. An Operations Concept for the Next Generation VLA

    Science.gov (United States)

    Kepley, Amanda; McKinnon, Mark; Selina, Rob; Murphy, Eric Joseph; ngVLA project

    2018-01-01

    This poster presents an operations plan for the next generation VLA (ngVLA), which is a proposed 214 element interferometer operating from ~1-115GHz, located in the southwestern United States. The operations requirements for this instrument are driven by the large number of antennas spread out over a multi-state area and a cap on the operations budget of 3 times that of the current VLA. These constraints require that the maintenance is a continuous process and that individual antennas are self-sufficient, making flexible subarrays crucial. The ngVLA will produce science ready data products for its users, building on the pioneering work being currently done at ALMA and the JVLA. Finally, the ngVLA will adopt a user support model similar to those at other large facilities (ALMA, HST, JWST, etc).

  16. Students Use VLA to Make Startling Brown-Dwarf Discovery

    Science.gov (United States)

    2001-03-01

    A group of summer students making a long-shot astronomical gamble with the National Science Foundation's (NSF) Very Large Array (VLA) have found the first radio emission ever detected from a brown dwarf, an enigmatic object that is neither a star nor a planet, but something in between. Their surprising discovery is forcing experts to re-think their theories about how brown dwarfs work. The Very Large Array "Many astronomers are surprised at this discovery, because they didn't expect such strong radio emission from this object," said Shri Kulkarni, a Caltech professor who was on the team that first discovered a brown dwarf in 1995, and advisor to one of the students. "What is so cool is that this is research that probably nobody else would have tried to do because of its low chance of success. That made it ideal for summer students -- we had almost nothing to lose," said Kate Becker, a student at Oberlin College in Ohio. "The radio emission these students discovered coming from this brown dwarf is 10,000 times stronger than anyone expected," said Dale Frail, an astronomer at the National Radio Astronomy Observatory (NRAO) in Socorro, NM. "This student project is going to open up a whole new area of research for the VLA," Frail added. The students, in addition to Becker, are: Edo Berger from Caltech; Steven Ball from New Mexico Tech in Socorro, NM; Melanie Clarke from Carleton College in Northfield, MN; Therese Fukuda from the University of Denver; Ian Hoffman from the University of New Mexico in Albuquerque; Richard Mellon from The Pennsylvania State University; Emmanuel Momjian from the University of Kentucky; Nathanial Murphy from Amherst College in Amherst, MA; Stacey Teng from the University of Maryland; Timothy Woodruff from Southwestern University in Georgetown, TX; Ashley Zauderer from Agnes Scott College in Decatur, GA; and Robert Zavala from New Mexico State University in Las Cruces, NM. Frail also is an author of the research paper, published in the March

  17. The upgrade of the forward Muon Spectrometer of the ATLAS Experiment: the New Small Wheel project

    CERN Document Server

    Iengo, Paolo; The ATLAS collaboration

    2017-01-01

    The current innermost stations of the ATLAS endcap muon tracking system (the Small Wheel) will be upgraded in 2019 and 2020 to retain the good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. The upgraded detector will consist of eight layers each of Resistive Micromegas (MM) and small-strip Thin Gap Chambers (sTGC) together forming the ATLAS New Small Wheels. Large area sTGC's up to 2 m2 in size and totaling an active area each of 1200 m2 will be employed for fast and precise triggering. The required spatial resolution of about 100 μm will allow the Level-1 trigger track segments to be reconstructed with an angular resolution of approximately 1mrad. The precision cathode plane has strips with a 3.2mm pitch for precision readout and the cathode plane on the other side has pads to produce a 3-out-of-4 coincidence to identify passage of a track in an sTGC quadruplet, selecting which strips to read-out. The eight layers of ...

  18. NRAO Makes Available VLA Sky Survey Maps

    Science.gov (United States)

    1994-06-01

    An original and comprehensive data set potentially full of scientific surprises now is available to astronomers, students and the public through the information superhighway. Radio images of the sky produced by the Very Large Array radio telescope -- one of the premier astronomical instruments in the world -- as part of a massive survey now are stored in an electronic repository avail- able over the Internet computer communications network. "Each of these sensitive new sky maps shows about a thou- sand radio-emitting objects, most of which have never been seen before," said Dr. J. J. Condon, leader of the National Radio As- tronomy Observatory (NRAO) survey team. "We are releasing them as soon as they are completed because they contain more data than we could possibly analyze by ourselves." "By using electronic distribution, we can open this tre- mendous resource of information for computer analysis by all as- tronomers immediately, without waiting for traditional publication," Condon added. The radio images are copyright NRAO/ AUI. Permission is granted for use of the material without charge for scholarly, educational and private non-commercial purposes. "It is entirely conceivable -- even probable -- that valuable discoveries will be made by students or amateur astrono- mers who devote the time to study these maps carefully," said team member Dr. W. D. Cotton. "Making this new information available electronically means that more people can participate in adding to its scientific value." The maps are a product of the NRAO VLA Sky Survey (NVSS), which began its observational phase in September of 1993 and will cover 82 percent of the sky when completed by the end of 1996. The NVSS is expected to produce a catalog of more than two million ra- dio-emitting objects in the sky, and it is the first sky survey sensitive to linearly polarized emission from radio sources beyond our own Milky Way galaxy. "The NVSS is being made as a service to the entire astronomical

  19. New VLA Images Unlocking Galactic Mysteries

    Science.gov (United States)

    2008-01-01

    Astronomers have produced a scientific gold mine of detailed, high-quality images of nearby galaxies that is yielding important new insights into many aspects of galaxies, including their complex structures, how they form stars, the motions of gas in the galaxies, the relationship of "normal" matter to unseen "dark matter," and many others. An international team of scientists used more than 500 hours of observations with the National Science Foundation's Very Large Array (VLA) radio telescope to produce detailed sets of images of 34 galaxies at distances from 6 to 50 million light-years from Earth. Their project, called The HI Nearby Galaxy Survey, or THINGS, required two years to produce nearly one TeraByte of data. HI ("H-one") is an astronomical term for atomic hydrogen gas. The astronomers presented their initial findings to the American Astronomical Society's (AAS) meeting in Austin, Texas. "Studying the radio waves emitted by atomic hydrogen gas in galaxies is an extremely powerful way to learn what's going on in nearby galaxies. The THINGS survey uses that tool to provide sets of images of the highest quality and sensitivity for a substantial sample of galaxies of different types," said Fabian Walter, of the Max-Planck Institute for Astronomy in Heidelberg, Germany. IC2574M74 Dwarf galaxy IC2574, left, and spiral galaxy M74, in THINGS images. Credit: Walter et al., NRAO/AUI/NSF Click images for high-resolution files (33 KB & 25 KB) Spiral Galaxies in THINGS Most of the galaxies studied in the THINGS survey also have been observed at other wavelengths, including Spitzer space telescope infrared images and GALEX ultraviolet images. This combination provides an unprecedented resource for unravelling the mystery of how a galaxy's gaseous material influences its overall evolution. Analysis of THINGS data already has yielded numerous scientific payoffs. For example, one study has shed new light on astronomers' understanding of the gas-density threshold required to

  20. Safety upgrading of Novi Han Repository under IAEA TC Project BUL/4/005 achievements and future plans

    International Nuclear Information System (INIS)

    Stefanova, I.

    2003-01-01

    The report presents the safety upgrading of the Novi Han Repository under the IAEA TC Project BUL/4/005. The Project covers: identification of radionuclide inventory; characterisation of the disposal vaults; site characterisation; safety assessment; upgrading of the monitoring and radiation control; selection of treatment and conditioning processes and a conceptual design for a new waste processing and storage facility and other direct measures for safety improvement. The current inventory is identified and presented in the report. Schemes of the vault for solid wastes and vault for biological wastes are given, demonstrating reinforced concrete, stainless steel lining, and hydro insulation are presented. Several studies for safety assessment are made between 1997 and 2003. The operational safety assessment for disposal in existing facilities gives the annual risk for: spilling of waste package during upload (7.58.10 -9 ); spilling of waste package in transport accident (2.90.10 -9 ); fire scenario (3.50.10 - 1 3 ); radionuclide release due to flooding or earthquake (5.05.10 -4 ). The monitoring radiation control is upgraded according to the regulatory guidance and covered the site, restricted zone (1 km) and supervised zone (5 km). The types of analyses made are: Direct measurement of the dose rate -TLD; Direct measurements of the dose rate - portable surveillance monitors; In situ gamma spectrometry; Gamma spectrometry; Gross beta, gross alpha; Liquid scintillation spectrometry. The analyses show no transfer od radionuclides to the environment. The individual radiation control shows no evidence for specific radiation pathology. The operational radiation control service premises and transport vehicles. The following is measured: gamma dose rate; beta exposure; alpha exposure; neutron radiation; contamination level. Under the development is a detailed technical design supply of equipment for characterization of waste, including hot cell for control over high level

  1. Nb3Sn High Field Magnets for the High Luminosity LHC Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, Giorgio

    2015-06-01

    The High Luminosity upgrade of the Large Hadron Collider at CERN requires a new generation of high field superconducting magnets. High field large aperture quadrupoles (MQXF) are needed for the low-beta triplets close to the ATLAS and CMS detectors, and high field two-in-one dipoles (11 T dipoles) are needed to make room for additional collimation. The MQXF quadrupoles, with a field gradient of 140 T/m in 150 mm aperture, have a peak coil field of 12.1 T at nominal current. The 11 T dipoles, with an aperture of 60 mm, have a peak coil field of 11.6 T at nominal current. Both magnets require Nb3Sn conductor and are the first applications of this superconductor to actual accelerator magnets.

  2. The Path from VLITE to ngLOBO: A Roadmap for Evolving a Low Frequency Commensal System from the JVLA to the ngVLA

    Science.gov (United States)

    Kassim, Namir E.; Clarke, Tracy; Giacintucci, Simona; Helmboldt, Joseph; Ray, Paul S.; Peters, Wendy; Polisensky, Emil; hicks, Brian C.; Brisken, Walter; hyman, Scott D.; Deneva, Julia; Kerr, Matthew T.; Taylor, Gregory; Dowell, Jayce; Schinzel, Frank K.

    2018-01-01

    The VLA Low-band Ionosphere and Transient Experiment (VLITE, ) is a commensal observing system on the NRAO Karl G. Jansky Very Large Array (VLA). The separate optical path of the prime-focus sub-GHz dipole feeds and the Cassegrain-focus GHz feeds provided an opportunity to expand the simultaneous frequency operation of the VLA through joint observations across both systems. 16 VLA antennas are outfitted with dedicated samplers and use spare fibers to transport the 320-384 MHz band to the VLITE CPU-based correlator. Initial goals included exploring the scientific potential of a commensal low frequency system for ionospheric remote sensing, astrophysics and transients. VLITE operates at nearly 70% wall time with roughly 6200 hours of VLA time recorded each year.Several papers at this meeting review VLITE science and early results. Here we consider how the project could evolve in the future. Over the next 10 years, a straightforward evolutionary path calls for an expansion of VLITE to all 27 VLA antennas and to the maximum available low band receiver bandwidth (224-480 MHz). The GPU-based correlator for this LOw Band Observatory (LOBO) would also incorporate lower frequency signals from the new VLA 74 MHz system, including from VLA dishes (60-80 MHz) and standalone Long Wavelength Array (LWA) aperture array stations (20-80 MHz).In the longer term, we look towards leveraging the vast infrastructure of the ngVLA to include a commensal low frequency capability, called ngLOBO. As described in our community white paper (Taylor et al. 2018; arXiv:1708.00090), ngLOBO has three primary scientific missions: (1) Radio Large Synoptic Survey Telescope (Radio-LSST): one naturally wide beam, commensal with ngVLA, will conduct a continuous synoptic survey of large swaths of the sky for both slow and fast transients; (2) This same commensal beam will provide complementary low frequency images of all ngVLA targets when such data enhances their value. (3) Independent beams from the ng

  3. The characterisation of the multianode photomultiplier tubes for the RICH-1 upgrade project at COMPASS

    Science.gov (United States)

    Abbon, P.; Alexeev, M.; Angerer, H.; Birsa, R.; Bordalo, P.; Bradamante, F.; Bressan, A.; Chiosso, M.; Ciliberti, P.; Colantoni, M. L.; Dafni, T.; Dalla Torre, S.; Delagnes, E.; Denisov, O.; Deschamps, H.; Diaz, V.; Dibiase, N.; Duic, V.; Eyrich, W.; Ferrero, A.; Finger, M.; Finger, M.; Fischer, H.; Gerassimov, S.; Giorgi, M.; Gobbo, B.; Hagemann, R.; von Harrach, D.; Heinsius, F. H.; Joosten, R.; Ketzer, B.; Kolosov, V. N.; Königsmann, K.; Konorov, I.; Kramer, D.; Kunne, F.; Lehmann, A.; Levorato, S.; Maggiora, A.; Magnon, A.; Mann, A.; Martin, A.; Menon, G.; Mutter, A.; Nähle, O.; Nerling, F.; Neyret, D.; Panzieri, D.; Paul, S.; Pesaro, G.; Pizzolotto, C.; Polak, J.; Rebourgeard, P.; Robinet, F.; Rocco, E.; Schiavon, P.; Schill, C.; Schoenmeier, P.; Schroeder, W.; Silva, L.; Slunecka, M.; Sozzi, F.; Steiger, L.; Sulc, M.; Svec, M.; Takekawa, S.; Tessarotto, F.; Teufel, A.; Wollny, H.

    2008-09-01

    A major upgrade of the Cherenkov photon detection system of COMPASS RICH-1 has been performed and it has been in operation since the 2006 physics run. The inner part of the photon detector has been replaced by a different technology in order to measure Cherenkov photons at high photoelectron rates, up to several times 10 6 per second and per channel. Cherenkov photons from 200 to 750 nm are detected by 576 multianode photomultiplier tubes (MAPMTs) with 16 channels each, coupled to individual fused silica lens telescopes and fast, high sensitivity and high time resolution electronics read-out. To guarantee an optimal performance of the complete system, parameters like dark current, gain, uniformity, relative quantum efficiency have been measured for a totality of more than 600 MAPMTs (about 10 000 channels) in a fully automated test-stand, developed for this purpose. The ideal working point for each individual pixel could be ascertained by these measurements. In 2006 the newly equipped detector exhibited an excellent performance: about 56 detected photons per ring at saturation and a time resolution of better than 1 ns. We report about the MAPMT characterisation and the quality control set-up, protocol and results.

  4. Performance of Large Area Micromegas Detectors for the ATLAS Muon Spectrometer Upgrade Project

    CERN Document Server

    AUTHOR|(SzGeCERN)743338; The ATLAS collaboration

    2016-01-01

    Four German institutes are building 32 high-rate capable SM2 Micromegas quadruplets, for the upgrade of the Small Wheels of the ATLAS muon spectrometer. The cathodes and strip-anodes of the 2 m$^2$ quadruplets consist of stable honeycomb sandwiches with a requested planarity better than 80 $\\mu$m. The qualification of full-size SM2 quadruplets will be performed in the Munich Cosmic Ray Measurement Facility (CRMF). Two fully working 4 m $\\times$ 2.2 m ATLAS drift-tube chambers provide muon tracking, a RD51 SRS based data acquisition system provides readout of all 12288 electronic channels using 96 APV25 front-end boards. The goal is to measure the homogeneity of pulse-height and efficiency and to determine the planarity of the sandwich planes and the positions of the readout-strips. This has been pioneered by studying a 102 $\\times$ 92 cm$^2$ Micromegas chamber with similar readout pitch in the CRMF using the TPC-like analysis method. At trigger rates above 100 Hz data taking takes only a few days for sufficie...

  5. Performance of Large Area Micromegas Detectors for the ATLAS Muon Spectrometer Upgrade Project

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration; Hertenberger, Ralf; Mueller, Ralph Soeren Peter; Bortfeldt, Jonathan; Flierl, Bernhard Matthias; Zibell, Andre

    2016-01-01

    Four German institutes are building the 32 high-rate capable SM2 Micromegas quadruplets, for the upgrade of the Small Wheels of the ATLAS muon spectrometer. The cathodes and strip-anodes of the m$^2$ in size quadruplets consist of stable honeycomb sandwiches with a requested planarity better than 80 $\\mu$m. The qualification of a full-size SM2 quadruplet, foreseen by ATLAS time schedule for August 2015, will be performed in the Munich Cosmic Ray Measurement Facility (CRMF). Two fully working 4 m$\\times$ 2.2 m ATLAS drift-tube chambers provide muon tracking, a RD51 SRS based data acquisition system provides readout of all 12288 electronic channels using 96 APV25 frontend boards. We report on homogeneity of pulse-height and efficiency and will present measurements of the planarity of the sandwich planes and the positions of the readout-strips. This has been pioneered by studying a $102 \\times 92$ cm$^2$ Micromegas chamber with similar readout pitch in the CRMF using the TPC-like analysis method. At trigger rate...

  6. Evaluating the Societal Impact of Using Drones to Support Urban Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Caroline M. Gevaert

    2018-03-01

    Full Text Available Unmanned Aerial Vehicles (UAVs, or drones, have been gaining enormous popularity for many applications including informal settlement upgrading. Although UAVs can be used to efficiently collect highly detailed geospatial information, there are concerns regarding the ethical implications of its usage and the potential misuse of data. The aim of this study is therefore to evaluate the societal impacts of using UAVs for informal settlement mapping through two case studies in Eastern Africa. We discuss how the geospatial information they provide is beneficial from a technical perspective and analyze how the use of UAVs can be aligned with the values of: participation, empowerment, accountability, transparency, and equity. The local concept of privacy is investigated by asking citizens of the informal settlements to identify objects appearing in UAV images which they consider to be sensitive or private. As such, our research is an explicit example of how to increase citizen participation in the discussion of geospatial data security and privacy issues over urban areas and provides a framework of strategies illustrating how such issues can be addressed.

  7. Ukraine-Japanese-Swedish project: Upgrading of perimeter protection system at Kharkov Institute of Physics and Technology (KIPT)

    International Nuclear Information System (INIS)

    Mikahaylov, V.; Lapshin, V.; Ek, P.; Flyghed, L.; Nilsson, A.; Ooka, N.; Shimizu, K.; Tanuma, K.

    2001-01-01

    Full text: Since the Ukraine voluntarily accepted the status of a non-nuclear-weapons state and concluded a Safeguards Agreement with the IAEA, the Kharkov Institute of Physics and Technology (KIPT) as a nuclear facility using the nuclear material of category 1, has become a Ukrainian priority object for the international community's efforts to ensure nuclear non-proliferation measures and to bring the existing protection systems to the generally accepted security standards. In March 1996, at the meeting held under the auspices of the IAEA in Kiev, the representatives from Japan, Sweden and the USA agreed to provide technical assistance concerning improvement of the nuclear material accountancy and control and physical protection system (MPC and A) available at KIPT. The Technical Secretariat of the Japan-Ukraine Committee for Co-operation on Reducing Nuclear Weapons and Swedish Nuclear Power Inspectorate undertook to solve the most expensive and labour-consuming task namely, the upgrading of the perimeter protection system at KIPT. This included that the current perimeter system, comprising several kilometers, should be completely replaced. Besides the above-mentioned problem, the upgrading should be carried out with the institute in operation. Thus, it was not allowed to replace the existing protection system by a new one unless KIPT was constantly protected. This required the creation of a new protected zone that to a large extent was occupied by the communication equipment, buildings, trees and other objects interfering with the work. All these difficulties required very comprehensive development of the project design as well as a great deal of flexibility during the implementation of the project. These problems were all successfully resolved thanks to a well working project organization, composed of experts from KIPT, JAERI and ANS, involving the highly qualified Swedish technical experts who played a leading role. In the framework of implementation of the

  8. A VLA Search for Radio Signals from M31 and M33

    Science.gov (United States)

    Gray, Robert H.; Mooley, Kunal

    2017-03-01

    Observing nearby galaxies would facilitate the search for artificial radio signals by sampling several billions of stars simultaneously, but few efforts have been made to exploit this opportunity. An added attraction is that the Milky Way is the second largest member of the Local Group, so our galaxy might be a probable target for hypothetical broadcasters in nearby galaxies. We present the first relatively high spectral resolution (intelligent radio signals of complete galaxies in the Local Group with the Jansky VLA, observing the galaxies M31 (Andromeda) and M33 (Triangulum)—the first and third largest members of the group, respectively—sampling more stars than any prior search of this kind. We used 122 Hz channels over a 1 MHz spectral window in the target galaxy velocity frame of reference, and 15 Hz channels over a 125 kHz window in our local standard of rest. No narrowband signals were detected above a signal-to-noise ratio of 7, suggesting the absence of continuous narrowband flux greater than approximately 0.24 and 1.33 Jy in the respective spectral windows illuminating our part of the Milky Way during our observations in 2014 December and 2015 January. This is also the first study in which the upgraded VLA has been used for SETI.

  9. VLA Observation of Seyfert Galaxy MRK 6

    Science.gov (United States)

    Xu, C.; Baum, S. A.; O'Dea, C.; Colbert, E. J. M.

    1997-12-01

    We have obtained deep radio observation of the Seyfert 1.5 galaxy Mrk6 with all VLA configurations at 6 and 20 cm. We confirm the existence of two pairs of diffuse low surface brightness radio lobes at different scales and orientations. The larger pair of lobes extend ( ~ 40" or 20 kpc) ~ 30(deg) NW-SE, and is evidence of starburst-driven superwind as suggested in Baum et. al (1993). The outer lobes are roughly perpendicular to a set of inner lobes which extend ( ~ 4" or 2 kpc) E-W and are in turn perpendicular to the inner jets imaged by Kukula et. al (1996). Both pairs of lobes appear to have shell-like structures, as implied by the observed anti-symmetric emission morphology which might be due to limb brightening as a result of increasing optical depth at the line of sight. The width of each structure is comparable to the length of the next smaller structure suggesting a "self-similar" (and possibly dynamical) relationship between these structures. These nested "bubble-like" structures with different orientations pose a challenge to the current paradigm of energy transport in Seyfert galaxies.

  10. Royal Military College of Canada SLOWPOKE-2 facility. Integrated regulating and instrumentation system (SIRCIS) upgrade project

    International Nuclear Information System (INIS)

    Corcoran, W.P.; Nielsen, K.S.; Kelly, D.G.; Weir, R.D.

    2013-01-01

    The SLOWPOKE-2 Facility at the Royal Military College of Canada has operated the only digitally controlled SLOWPOKE reactor since 2001 (Version 1.0). The present work describes ongoing project development to provide a robust digital reactor control system that is consistent with Aging Management as summarized in the Facility's Life Cycle Management and Maintenance Plan. The project has transitioned from a post-graduate research activity to a comprehensively managed project supported by a team of RMCC professional and technical staff who have delivered an update of the V1.1 system software and hardware implementation that is consistent with best Canadian nuclear industry practice. The challenges associated with the implementation of Version 2.0 in February 2012, the lessons learned from this implementation, and the applications of these lessons to a redesign and rewrite of the RMCC SLOWPOKE-2 digital instrumentation and regulating system (Version 3) are discussed. (author)

  11. Upgrading to Web 2.0: An Experiential Project to Build a Marketing Wiki

    Science.gov (United States)

    Cronin, John J.

    2009-01-01

    Wikis are one of the newest features of Web 2.0. This article describes the implementation of a project in a marketing course in which students created an interactive textbook using wiki software. Several surprises encountered along the way are described, and the unique problem of grading individual contributions to a wiki is discussed. The author…

  12. The Control Room Upgrade in Oskarshamn 2 Modernization Project Lesson Learned from Ongoing Human Factor design

    International Nuclear Information System (INIS)

    Thomas, Gunnarsson; Magnus, Eliasson

    2011-01-01

    Due to recent changes in Swedish commercial nuclear safety system requirements, OKG decided to make the changes required by the new safety requirements, apply for a 30-year license extension, and to concurrently make changes for a major power uprate; this project is called the Plant Life Extension project (PLEX). It was decided, in addition to several plant modifications, to re build the old control room to a new modern screen-based control room located in the same space as the old one, and with the same number of operators. This paper explains the approach taken when modernizing the control room as a part of the Oskarshamn 2 Modernization project PLEX, the results, and the lessons learned from this ongoing work. The combination of changes results in a modernization project that is expected to increase output power by approximately 50 MWe through increased efficiency and to result in an increase in thermal power from 1800 MWt to 2300 MWt (28%) and electrical power from 620 MWe to 840 MWe due to the power uprate. The license to operate OKG2 expires in 2012 The PLEX project is one of the most ambitious nuclear power plant modernization projects ever implemented, world-wide. The application of human factors engineering (HFE) and control room and HSI design is a complex challenge. The original main control room from 1975 in Oskarshamn 2, was quite compact and provided a fairly good overview of the process. New requirements for enhanced safety and other design changes in the process systems and instrumentation led to a step-wise installation of new information and control equipment in the control room. Since the control room was quite limited in space, the control room grew larger, and the new equipment was installed farther away from the operator workplaces into an adjacent control room. This was even the case for the new safety systems. These systems were functioning well separately as such, but in some cases their interfaces were inconsistent, leading to increased

  13. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  14. VLA Discovers Giant Rings Around Galaxy Cluster

    Science.gov (United States)

    2006-11-01

    Astronomers using the National Science Foundation's Very Large Array (VLA) radio telescope have discovered giant, ring-like structures around a cluster of galaxies. The discovery provides tantalizing new information about how such galaxy clusters are assembled, about magnetic fields in the vast spaces between galaxy clusters, and possibly about the origin of cosmic rays. Radio-Optical Image of Cluster Galaxy Cluster Abell 3376 (Radio/Optical) CREDIT: Joydeep Bagchi, IUCAA, NRAO/AUI/NSF Above, a combined radio/optical image shows the galaxy cluster Abell 3376 in visible light (blue) and radio (red) images. The giant radio arcs surrounding the cluster were discovered using the Very Large Array. The visible-light image is from the Digitized Sky survey. Below, an X-ray image of Abell 3376 made using the European Space Agency's XMM-Newton telescope shows a spectacular, bullet-shaped region of X-rays coming from gas heated to 60 million degrees Kelvin. The bullet shape results from the supersonic collision of a smaller smaller galaxy subcluster with the main body of the larger cluster. Click on images for larger version. X-Ray Image of Cluster Galaxy Cluster Abell 3376 (X-Ray) CREDIT: Joydeep Bagchi, IUCAA, ESA "These giant, radio-emitting rings probably are the result of shock waves caused by violent collisions of smaller groups of galaxies within the cluster," said Joydeep Bagchi, of the Inter-University Centre for Astronomy and Astrophysics in Pune, India, who led an international research team. The scientists reported their findings in the November 3 edition of the journal Science. The newly-discovered ring segments, some 6 million light-years across, surround a galaxy cluster called Abell 3376, more than 600 million light-years from Earth. They were revealed because fast-moving electrons emitted radio waves as they spiraled around magnetic field lines in intergalactic space. "Even from this large distance, the feeble radio waves were easily picked up by the VLA

  15. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  16. The provision of Technical Co-operation: The model project for upgrading radiation protection infrastructure

    International Nuclear Information System (INIS)

    Barretto, P.M.C.

    2001-01-01

    The paper describes the IAEA's systematic effort to address the inadequate situation in many of its Member States with regard to radiation protection and safety. For this effort a special project was created and implemented in the past five years to create or strengthen existing radiation protection infrastructure in 52 countries where such infrastructure was non-existent or not appropriate for the type of practice involved. The implementation of this project focused on the development of qualified human resources, assistance for introduction of appropriate legislation and equipment for inspection and analysis. Workplans were tailored to the individual needs of each participating country and the elements of these workplans were grouped into five milestones -- regulatory framework, occupational exposure control, medical exposure control, public exposure control, and emergency preparedness and response capabilities. By the end of 2000 more than 70% of the participating countries had radiation protection laws promulgated and a regulatory authority established; 46% had regulations adopted and 42% had a system of notification, authorization and control of radiation sources operational. During the five years of implementation, 555 fellows received individual training, another 2278 participated in training courses, over 1000 expert missions were fielded and equipment worth about US $6 million was provided. The total cost was over US $17 million. (author)

  17. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    International Nuclear Information System (INIS)

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  18. Prototype board development for the validation of the VMM ASICs for the New Small Wheel ATLAS upgrade project

    CERN Document Server

    Gkountoumis, Panagiotis; The ATLAS collaboration

    2018-01-01

    The VMM is a custom Application Specific Integrated Circuit (ASIC) which was designed to be used in the front-end readout electronics of both micromegas (MM) and small Thin Gap Chambers (sTGC) detectors of the New Small Wheel (NSW) Phase-I upgrade project of the ATLAS experiment. A new version of the VMM was recently fabricated and for that reason various prototype boards, the micromegas Front-End (MMFE1) and the General Purpose VMM (GPVMM), have been fabricated and extensively tested in order to validate the functionality of the ASIC. These boards use commercial Field Programmable Gate Arrays (FPGAs) for direct communication with computers which is achieved through 10/100/1000 Mbps Ethernet and UDP/IP protocols. The low noise performance of these boards gave the opportunity to be used in various test beams with micromegas detectors for validating the VMM and for performance studies of the sTGC detectors. A detailed description of the boards along with the results of the test beam and the detector studies wi...

  19. Prototype board development for the validation of the VMM ASICs for the New Small Wheel ATLAS upgrade project

    CERN Document Server

    Gkountoumis, Panagiotis; The ATLAS collaboration

    2018-01-01

    The VMM is a custom Application Specific Integrated Circuit (ASIC) which was designed to be used in the frontend readout electronics of both micromegas (MM) and small Thin Gap Chambers (sTGC) detectors of the New Small Wheel (NSW) Phase-I upgrade project of the ATLAS experiment. A new version of the VMM was recently fabricated and for that reason various prototype boards, the micromegas Front-End (MMFE1) and the General Purpose VMM (GPVMM), have been fabricated and extensively tested in order to validate the functionality of the ASIC. These boards use commercial Field Programmable Gate Arrays (FPGAs) for direct communication with computers which is achieved through 10=100=1000 Mbps Ethernet and UDP/IP protocols. The low noise performance of these boards gave the opportunity to be used in various test beams with micormegas detectors for validating the VMM and for performance studies of the sTGC detectors. A detailed description of the boards along with the results of the test beam and the detector studies will...

  20. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  1. Electron-cloud simulation studies for the CERN-PS in the framework of the LHC Injectors Upgrade project

    CERN Document Server

    Rioja Fuentelsaz, Sergio

    The present study aims to provide a consistent picture of the electron cloud effect in the CERN Proton Synchrotron (PS) and to investigate possible future limitations due to the requirements foreseen by the LHC Injectors Upgrade (LIU) project. It consists of a complete simulation survey of the electron cloud build-up in the different beam pipe sections of the ring depending on several controllable beam parameters and vacuum chamber surface properties, covering present and future operation parameters. As the combined function magnets of the accelerator constitute almost the $80\\%$ in length of the ring, the implementation of a new feature for the simulation of any external magnetic field on the PyECLOUD code, made it possible to perform this study. All the results of the simulations are given as a function of the vacuum chamber surface properties in order to deduce them, both locally and globally, when compared with experimental data. In a first step, we characterize locally the maximum possible number of ...

  2. GENII [Generation II]: The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs

  3. Measurements of ion mobility and GEM discharge studies for the upgrade of the ALICE time projection chamber

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00507268

    2018-02-20

    ALICE is one of the four experiments at the Large Hadron Collider (LHC). The quark-gluon plasma, which is predominantly produced in lead-lead collisions at LHC, is of particular interest for ALICE. After the long shut-down 2 (2019-2021) the LHC will provide lead-lead collisions at an increased interaction rate of 50 kHz. In order to examine every event at this interaction rate the ALICE Time Projection Chamber (TPC) needs to be upgraded. The TPC’s ReadOut Chambers (ROCs) are currently multi-wire proportional chambers. To prevent space charge build-up of slow ions, drifting from the ROCs into the TPC, a gating grid is used. The corresponding closure time imposes a dead time on the TPC read out, which prohibits data taking at a readout rate higher than 3 kHz. New ROCs have therefore been designed, relying on stacks of Gas Electron Multiplier (GEM) foils for the gas amplification, allowing for continuous readout. With the new ROCs, a certain fraction of ions will be drifting at all time into the TPC. Knowing t...

  4. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs

  5. Reguibat calcrete uranium project, Mauritania: Beneficiation upgrades and rapid leaching. A new paradigm for “calcrete” uranium projects?

    International Nuclear Information System (INIS)

    Beeson, Bob; Clifford, Neil; Goodall, Will

    2014-01-01

    Future of the project: • Scoping Study completed in the next two weeks; • Moving into Feasibility Studies: – Measured and Indicated resources; – Detailed beneficiation testing; – Leach testing of uranium concentrates; – Water drilling; – Commence process for Exploitation Permit. • Decision to mine in 12-18 months subject to funding; • Target production early 2017; • Convert known anomalies to achieve a 100Mlb uranium resource

  6. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  7. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  8. Interaction of VLA-5 Molecule With Rheumatoid Articular Cartilage Surface : An Electron Microscopic Evidence of Expression of VLA-5 on Pannus Invading Cells

    OpenAIRE

    Ishikawa, Hitoshi; Hirata, Souichirou; Saura, Ryuuichi; Andoh, Yoshihiro; Mizuno, Kosaku

    1998-01-01

    Pannus is made up mainly of fibroblasts, macrophages and lymphocytes. VLA-5 positive cells are present in the pannus in large numbers. It is likely that the tissue distribution of infiltrated cells derived from post-capillary venules is influenced by the ECM of the pannus and the ability of these cells to interact with the ECM through surface receptor expression. VLA-5 molecules are the predominant (31 integrins expressed by synovial pannus. Since the VLA integrins function as fibronectin rec...

  9. Debris Disk Studies with the ngVLA

    Science.gov (United States)

    Wilner, David; Matthews, Brenda; Matra, Luca; Kennedy, Grant; Wyatt, Mark; Greaves, Jane

    2018-01-01

    We discuss the potential for the ngVLA to advance understanding of debris disks around main-sequence stars. Since the dust-producing planetesimals that replenish these disks through collisions persist only in stable regions like belts and resonances, their locations and physical properties encode essential information about the formation of exoplanetary systems and their dynamical evolution. Observations at long millimeter wavelengths can play a special role because the large grains that dominate the emission are faithful tracers of the dust-producing planetesimals, unlike small grains seen at shorter wavelengths that are rapidly redistributed by stellar radiation and winds. Sensitive observations of debris disks with the ngVLA can (1) reveal structures resulting from otherwise inaccessible planets on wide orbits, (2) test collisional models using spectral slopes to constrain mm/cm grain size distributions, and (3) for select sources, probe the water content of exocomets using the 21 cm HI line.

  10. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  11. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  12. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  13. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  14. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  15. Get a winning Oracle upgrade session using the quarterback approach

    Science.gov (United States)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  16. Preliminary Antenna Concept for the ngVLA

    Science.gov (United States)

    Di Francesco, James; Selina, Robert; Grammer, Wes; McKinnon, Mark M.

    2017-01-01

    The preliminary concept for a Next Generation Very Large Array (ngVLA) calls for an interferometric array having an effective collecting area and spatial resolution that are both 10 times better than that of the current VLA and operating over a frequency range of 1.2-116 GHz. Given the large number of antennas needed to meet the collecting area goal, the ngVLA antenna concept must strike a balance between competing science requirements and the programmatic targets for the array’s life cycle cost.Antenna diameters currently under consideration for the ngVLA are in the range of 12-25 m, with a nominal 18-m diameter aperture used for the conceptual design. Currently, the optimization for operations and construction cost suggests that a smaller number of larger apertures is preferable.The surface accuracy goal for the antennas is 185 µm rms (λ/16 @ 100 GHz) for the primary and subreflector combined under optimal environmental conditions. The subreflector will be optimized for performance above 10 GHz, with some degradation in aperture efficiency accepted at lower frequencies.For high dynamic range imaging, particularly at the low end of the ngVLA’s frequency range, the optimum optical configuration is likely an offset geometry. An unblocked aperture will minimize scattering, spillover, and sidelobe pickup. Both performance and maintenance requirements favor a receiver feedarm on the low side of the reflector.High pointing accuracy will also be necessary to provide the imaging dynamic range required of the system. With an unblocked aperture, variations in the antenna gain pattern are expected to be dominated by pointing errors. Preliminary requirements are for an absolute pointing accuracy of 40” RMS, with referenced pointing of 3” RMS (FWHM/10 at 10 GHz and 120 GHz, respectively, for an 18-m diameter dish).The antenna mount is expected to be a typical altitude-azimuth design. Both pedestal bearing and rail-based azimuth drives are under consideration. If fast

  17. VLA observations of dwarf M flare stars and magnetic stars

    Science.gov (United States)

    Willson, R. F.; Lang, K. R.; Foster, P.

    1988-01-01

    The VLA has been used to search for 6 cm emission from 16 nearby dwarf M stars, leading to the detection of only one of them - Gliese 735. The dwarf M flare stars AD Leonis and YZ Canis Minoris were also monitored at 6 cm and 20 cm wavelength in order to study variability. Successive oppositely circularly polarized bursts were detected from AD Leo at 6 cm, suggesting the presence of magnetic fields of both magnetic polarities. An impulsive 20-cm burst from YZ CMi preceded slowly varying 6-cm emission. The VLA was also used, unsuccessfully, to search for 6-cm emission from 13 magnetic Ap stars, all of which exhibit kG magnetic fields. Although the Ap magnetic stars have strong dipolar magnetic fields, the failure to detect gyroresonant radiation suggests that these stars do not have hot, dense coronae. The quiescent microwave emission from GL 735 is probably due to nonthermal radiation, since unusually high (H = 50 kG or greater) surface magnetic fields are inferred under the assumption that the 6-cm radiation is the gyroresonant radiation of thermal electrons.

  18. Recent VLA Measurements of CME-Induced Faraday Rotation

    Science.gov (United States)

    Kooi, Jason; Thomas, Najma; Guy, Michael; Spangler, Steven R.

    2018-01-01

    Observations of Faraday rotation, the change in polarization position angle of linearly polarized radiation as it propagates through a magnetized plasma, have been used for decades to determine the strength and structure of the coronal magnetic field and plasma density. Similarly, observations of Faraday rotation through a coronal mass ejection (CME) have the potential to improve our understanding of the CME’s plasma structure. We report recent results from simultaneous white-light coronagraph and radio observations made of a CME in July 2015. We made radio observations using the Karl G. Jansky Very Large Array (VLA) at 1 - 2 GHz frequencies of a set of cosmic radio sources through the solar corona at heliocentric distances that ranged between 8 - 23 solar radii. A unique aspect of these observations is that the CME occulted several of these radio sources and, therefore, our Faraday rotation measurements provide information on the plasma structure in different regions of the CME. We successfully measured CME-induced Faraday rotation along multiple lines of sight because we made special arrangements with the staff at the National Radio Astronomy Observatory to trigger VLA observations when a candidate CME appeared low in the corona in near real-time images from the Large Angle and Spectrometric Coronagraph (LASCO) C2 instrument.

  19. Improved analysis of plasmasphere motion using the VLA radio interferometer

    Directory of Open Access Journals (Sweden)

    G. W. Hoogeveen

    1997-02-01

    Full Text Available Observations using the very large (VLA radio interferometer during the past five years have enabled the discovery of a new type of plasmasphere disturbance, the magnetic eastward-directed wave. Previous work indicated these disturbances were likely frozen to the geomagnetic field as determined from their azimuth distributions. This work provides a method to explain more accurately the azimuth distribution, thereby allowing the calculation of the disturbances' location in the plasmasphere independently of the measured velocity. The measurable velocity due to corotation is calculated and subtracted from the measured trace velocity. This difference, or deviation from corotation, is attributed to electrodynamic convection; the measurement of plasmaspheric convection may lead to the eventual monitoring of mid-latitude electric fields. Disturbances are seen convecting predominantly westward, with the fastest having angular velocities greater than the anticorotating VLA line of sight. The direction of convection and conditions of observations indicate that the disturbances are likely the same phenomenon seen by the Los Alamos satellite beacon array.

  20. Improved analysis of plasmasphere motion using the VLA radio interferometer

    Directory of Open Access Journals (Sweden)

    G. W. Hoogeveen

    Full Text Available Observations using the very large (VLA radio interferometer during the past five years have enabled the discovery of a new type of plasmasphere disturbance, the magnetic eastward-directed wave. Previous work indicated these disturbances were likely frozen to the geomagnetic field as determined from their azimuth distributions. This work provides a method to explain more accurately the azimuth distribution, thereby allowing the calculation of the disturbances' location in the plasmasphere independently of the measured velocity. The measurable velocity due to corotation is calculated and subtracted from the measured trace velocity. This difference, or deviation from corotation, is attributed to electrodynamic convection; the measurement of plasmaspheric convection may lead to the eventual monitoring of mid-latitude electric fields. Disturbances are seen convecting predominantly westward, with the fastest having angular velocities greater than the anticorotating VLA line of sight. The direction of convection and conditions of observations indicate that the disturbances are likely the same phenomenon seen by the Los Alamos satellite beacon array.

  1. VLA observations of NGC 1265 at 4886 MHz

    International Nuclear Information System (INIS)

    Owen, F.N.; Burns, J.O.; Rudnick, L.

    1978-01-01

    Observations are presented of the head-tail radio galaxy NGC 1265, made with the VLA at 4886 MHz. The total intensity brightness distribution has a resolution of 1' x 1'.5 and an rms noise of approx.150 μJy/beam area. These observations, combined with data at 2695 and 8085 MHz on a 35 km baseline in Green Bank, show that the nuclear component is less than 0'.1 and has a slightly inverted spectrum.The VLA map reveals a narrow continuous stream of emission leading away from the nucleus and out into the lower-surface brightness tail. Several small knots are superposed on the stream. This brightness distribution is compared with the independent-blob model of Jaffe and Perola. We find that the brightness distribution predicted by this model does not agree well with the observed brightness distribution. We suggest that a hot interstellar medium in the galaxy may be necessary to explain the complex structure

  2. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  3. Safety evaluation for instrumentation and control system upgrading project of Malaysian TRIGA MARK II PUSPATI Research reactor

    International Nuclear Information System (INIS)

    Ridha Roslan; Nik Mohd Faiz Khairuddin

    2013-01-01

    Full-text: Malaysian TRIGA MARK II research reactor has been in safe operation since its first criticality in 1982. The reactor is licensed to be operated by Malaysian Nuclear Agency to perform training and research development related activities. Due to its extensive operation since last three decades, the option of modifications for safety and safety-related item and component become a necessary to replace the outdated equipment to a stat-of-art, reliable technologies. This paper will present the current regulatory activities performed by Atomic Energy Licensing Board (AELB) to ensure the upgrading of analogue to digital instrumentation and control system is implemented in safe manner. The review activity includes documentation review, manufacturer quality audit and on-site inspection for commissioning. The review performed by AELB is based on The International Atomic Energy Agency (IAEA) Safety Requirements NS-R-4, entitled Safety of Research Reactors. During this endeavour, AELB seeks technical cooperation from Korea Institute of Nuclear Safety (KINS), the nuclear experts organization of the country of origin of the instrumentation and control technology. The regulatory activity is still on-going and is expected to be completed by issuance of Authorization for Restart on December 2013. (author)

  4. Design and Construction of Precision Tooling for Construction of Micromegas Detectors for the ATLAS Small Wheel Upgrade Project in Germany

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration; Schaile, Otto; Hertenberger, Ralf; Biebel, Otmar; Bortfeldt, Jonathan; Flierl, Bernhard Matthias

    2016-01-01

    Mechanical precision is a key-aspect of the high-rate capable Micromegas detectors for the upgrade of the Small Wheels of the ATLAS muon spectrometer. 32 SM2 quadruplets will be built by four German institutes with cathodes and strip-anodes made of stable honeycomb sandwiches. To achieve a single plane resolution below $100\\mu m$ the deviation from planarity of a single detector plane must not exceed $80\\mu m$ over the whole active area and the global position of the readout strips has to be within $30\\mu m$ for a single readout-plane of 3 PCB's, as well as between all four planes of a quadruplet. Precision tooling is used for the correct positioning of readout PCB's and readout sandwich planes. For quality control of the planarity of the sandwich planes a laser distance sensor combined with a coordinate measurement system has been developed. Deviation from planarity below 10 $\\mu$m can be easily resolved. We will present key features of the challenging construction procedure to achieve this high level of pre...

  5. Activated Protein C Attenuates Severe Inflammation by Targeting VLA-3high Neutrophil Subpopulation in Mice.

    Science.gov (United States)

    Sarangi, Pranita P; Lee, Hyun-Wook; Lerman, Yelena V; Trzeciak, Alissa; Harrower, Eric J; Rezaie, Alireza R; Kim, Minsoo

    2017-10-15

    The host injury involved in multiorgan system failure during severe inflammation is mediated, in part, by massive infiltration and sequestration of hyperactive neutrophils in the visceral organ. A recombinant form of human activated protein C (rhAPC) has shown cytoprotective and anti-inflammatory functions in some clinical and animal studies, but the direct mechanism is not fully understood. Recently, we reported that, during endotoxemia and severe polymicrobial peritonitis, integrin VLA-3 (CD49c/CD29) is specifically upregulated on hyperinflammatory neutrophils and that targeting the VLA-3 high neutrophil subpopulation improved survival in mice. In this article, we report that rhAPC binds to human neutrophils via integrin VLA-3 (CD49c/CD29) with a higher affinity compared with other Arg-Gly-Asp binding integrins. Similarly, there is preferential binding of activated protein C (PC) to Gr1 high CD11b high VLA-3 high cells isolated from the bone marrow of septic mice. Furthermore, specific binding of rhAPC to human neutrophils via VLA-3 was inhibited by an antagonistic peptide (LXY2). In addition, genetically modified mutant activated PC, with a high affinity for VLA-3, shows significantly improved binding to neutrophils compared with wild-type activated PC and significantly reduced neutrophil infiltration into the lungs of septic mice. These data indicate that variants of activated PC have a stronger affinity for integrin VLA-3, which reveals novel therapeutic possibilities. Copyright © 2017 by The American Association of Immunologists, Inc.

  6. Slum upgrading in developing countries: lessons from Ghana and ...

    African Journals Online (AJOL)

    The paper identifies common elements in the upgrading programmes in the literature. It assesses two slum upgrading projects from Ghana and Kenya to determine how the elements were factored into the projects' implementation. The article concludes that stakeholders involved in slum upgrading in Africa should consider ...

  7. IRAS colors of VLA identified objects in the galaxy

    International Nuclear Information System (INIS)

    Fich, M.; Terebey, S.

    1987-01-01

    Infrared Astronomy Satellite (IRAS) sources found within 4 degrees of l = 125 deg, b = 2 deg on the 3rd HCON 60 micron Sky Brightness Images were observed at the Very Large Array (VLA). Regions were to be identified where massive stars are forming by looking for small areas of radio continuum emissions. The IRAS sources could be divided into three groups by their IRAS 12 micron/25 micron and 60 micron/100 micron color. The group identified with star forming regions contained essentially all of the objects with extended radio emission. In all of these cases the extended radio emission showed a morphology consistent with the identification of these objects as HII regions. The conclusion drawn is that star formation regions can be distinguished from other objects by their infrared colors

  8. The TACIS Nuclear Programme: Assistance in Upgrading Russian Nuclear Power Stations - An Overview of the Individual Projects in the Internet

    International Nuclear Information System (INIS)

    Bieth, Michel; Schoels, Hubert

    2006-01-01

    The European Union' TACIS1 programme has been established for the New Independent States (NIS), among them in the Russian Federation since 1991. One priority of TACIS funding is Nuclear Safety. The European Commission has made available a total of 944 Million Euros for nuclear safety programmes covering the period 1991-2003. The TACIS nuclear safety programme is devoted to the improvement of the safety of Soviet designed nuclear installations in providing technology and safety culture transfer. JRC is carrying out works in the following areas: On-Site Assistance for TACIS operating Nuclear Power Plants; Design Safety and Dissemination of TACIS results; Reactor Pressure Vessel Embrittlement for VVER; Regulatory Assistance; Industrial Waste Management; Nuclear Safeguards; All TACIS projects, dealing with these areas of activity are now available in so called Project Description Sheets (PDS) or Project Results Sheets (PRS) in the Internet for everybody. JRC has created in the Internet an easy to open and to browse database which contains the result of works in relation to the above mentioned nuclear activities. This presentation gives an on-line overview of the app. 430 projects which have been implemented so far since the outset of the TACIS Nuclear Programme in the Russian Federation, which is representative to the other CIS countries, benefiting from the TACIS. The presentation will mainly consist of an on-line-demonstration of the TACIS Nuclear WEB Page, created by JRC. (authors)

  9. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  10. Getting the Big Picture: Design Considerations for a ngVLA Short Spacing Array

    Science.gov (United States)

    Mason, Brian Scott; Cotton, William; Condon, James; Kepley, Amanda; Selina, Rob; Murphy, Eric Joseph

    2018-01-01

    The Next Generation VLA (ngVLA) aims to provide a revolutionary increase in cm-wavelength collecting area and sensitivity while at the same time providing excellent image fidelity for a broad spectrum of science cases. Likely ngVLA configurations currently envisioned provide sensitivity over a very wide range of spatial scales. The antenna diameter (notionally 18 meters) fundamentally limits the largest angular scales that can be reached. One simple and powerful way to image larger angular scales is to build a complementary interferometer comprising a smaller number of smaller-diameter dishes.We have investigated the requirements that such an array would need to meet in order to usefully scientifically complement the ngVLA; this poster presents the results of our investigation.

  11. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  12. Specifications of the Field Quality at Injection Energy of the New Magnets for the HL-LHC Upgrade Project

    CERN Document Server

    De Maria, R; Giovannozzi, M

    2013-01-01

    The HL-LHC project relies on new magnet designs and technologies to achieve very small beta* values. In particular, Nb$_{3}$Sn magnets show large allowed multipole imperfections at low current. These field imperfections may have a non-negligible impact on the dynamic aperture and beam life time in the HL-LHC, also because of the smaller-than- nominal beta* values foreseen IR1 and IR5 at injection energy, which aims at decreasing the dynamic range of the squeeze and therefore contributing to optimize the turn around time. The paper describes an analysis of the machine performance based on analytical estimates and tracking simulations with the goal of providing field quality specifications for the new magnets.

  13. Activated integrin VLA-4 localizes to the lamellipodia and mediates T cell migration on VCAM-11

    Science.gov (United States)

    Hyun, Young-Min; Chung, Hung-Li; McGrath, James L.; Waugh, Richard E.; Kim, Minsoo

    2009-01-01

    Lymphocyte migration from blood into lymphoid tissues or to sites of inflammation occurs through interactions between cell surface integrins and their ligands expressed on the vascular endothelium and the extracellular matrix. Very Late Antigen-4 (VLA-4, α4β1) is a key integrin in the effective trafficking of lymphocytes. Although it has been well established that integrins undergo functionally significant conformational changes to mediate cell adhesion, there is no mechanistic information that explains how these are dynamically and spatially regulated during lymphocyte polarization and migration. Using dynamic fluorescence resonance energy transfer (FRET) analysis of a novel VLA-4 FRET sensor under total internal reflection fluorescence (TIRF) microscopy, we show that VLA-4 activation localizes to the lamellipodium in living cells. During T cell migration on VCAM-1, VLA-4 activation concurs with spatial redistribution of chemokine receptor and active Rap1 at the leading edge. Selective inhibition of the activated VLA-4 at leading edge with a small molecule inhibitor is sufficient to block T cell migration. These data suggest that a subpopulation of activated VLA-4 is mainly localized to the leading edge of polarized human T cells, and is critical for T cell migration on VCAM-1. PMID:19542447

  14. Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook Nuclear Plant units 1 and 2

    International Nuclear Information System (INIS)

    Carruth, R.C.; Sotos, W.G.

    1996-01-01

    As the nation's nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant's protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade

  15. A Rotation Measure Gradient on the M87 VLA Jet

    Directory of Open Access Journals (Sweden)

    Algaba Juan Carlos

    2013-12-01

    Full Text Available Rotation measures (RMs have proven to be an excellent tool to study magnetic field structures in AGNs. Here we study RM properties on kiloparsec scales of theM87 jet via stacked multi wavelength polarized VLA observations. Our results show for the first time an indication of the RM gradient transverse to the jet in knot A, and possibly knot C and HST-1. Motivated by the shape of the RM in knots A and B, we discuss that part of it may be a filamentary structure of higher RM due to an external Faraday screen, although we consider this unlikely The data presented here can be easily explained by a helical magnetic field. By combining this result together with polarization direction plus the shape and degree of the fractional polarization across the jet, we can fairly conclude the presence of systematically wrapped, possibly helical, magnetic fields tightly wounded in knots A and C, in agreement with an MHD quad shock model.

  16. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  17. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  18. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  19. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  20. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  1. DISENTANGLING THE ENTANGLED: OBSERVATIONS AND ANALYSIS OF THE TRIPLE NON-COEVAL PROTOSTELLAR SYSTEM VLA1623

    International Nuclear Information System (INIS)

    Murillo, Nadia M.; Lai, Shih-Ping

    2013-01-01

    Commonplace at every evolutionary stage, multiple protostellar systems (MPSs) are thought to be formed through fragmentation, but it is unclear when and how. The youngest MPSs, which have not yet undergone much evolution, provide important constraints to this question. It is then of interest to disentangle early stage MPSs. In this Letter we present the results of our work on VLA1623 using our observations and archival data from the Submillimeter Array. Our continuum and line observations trace VLA1623's components, outflow, and envelope, revealing unexpected characteristics. We construct the spectral energy distribution (SED) for each component using the results of our work and data from literature, as well as derive physical parameters from continuum and perform a simple kinematical analysis of the circumstellar material. Our results show VLA1623 to be a triple non-coeval system composed of VLA1623A, B, and W, with each source driving its own outflow and unevenly distributed circumstellar material. From the SED, physical parameters, and IR emission we conclude that VLA1623A and W are Class 0 and Class I protostars, respectively, and together drive the bulk of the observed outflow. Furthermore, we find two surprising results, first the presence of a rotating disk-like structure about VLA1623A with indications of pure Keplerian rotation, which, if real, would make it one of the first evidence of Keplerian disk structures around Class 0 protostars. Second, we find VLA1623B to be a bona fide extremely young protostellar object between the starless core and Class 0 stages.

  2. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  3. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  4. EVOLUTION OF THE WATER MASER EXPANDING SHELL IN W75N VLA 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jeong-Sook; Kim, Sang Joon [School of Space Science, Kyunghee University, Seocheon-dong, Giheung-si, Gyeonggi-do, 446-701 (Korea, Republic of); Kim, Soon-Wook [Korea Astronomy and Space Science Institute, 776 Daedeokdaero, Yuseong, Daejeon 305-348 (Korea, Republic of); Kurayama, Tomoharu [Graduate School of Science and Engineering, Kagoshima University, 1-21-35 Korimoto, Kagoshima, Kagoshima 890-0065 (Japan); Honma, Mareki [National Astronomical Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo 181-8588 (Japan); Sasao, Tesuo [Yaeyama Star Club, Ookawa, Ishigaki, Okinawa 904-0022 (Japan); Surcis, Gabriele [Joint Institute for VLBI in Europe, Postbus 2, 7990 AA Dwingeloo (Netherlands); Canto, Jorge [Instituto de Astronomia (UNAM), Apartado 70-264, 04510 Mexico D. F. (Mexico); Torrelles, Jose M., E-mail: evony@kasi.re.kr, E-mail: skim@kasi.re.kr [Instituto de Ciencias del Espacio (CSIC)-UB/IEEC, Universitat de Barcelona, Marti i Franques 1, E-08028 Barcelona (Spain)

    2013-04-10

    We present Very Long Baseline Interferometry (VLBI) observations of 22 GHz H{sub 2}O masers in the high-mass star-forming region of W75N, carried out with VLBI Exploration of Radio Astrometry (VERA) for three epochs in 2007 with an angular resolution of {approx}1 mas. We detected H{sub 2}O maser emission toward the radio jet in VLA 1 and the expanding shell-like structure in VLA 2. The spatial distribution of the H{sub 2}O masers detected with VERA and measured proper motions around VLA 1 and VLA 2 are similar to those found with previous VLBI observations in epochs 1999 and 2005, with the masers in VLA 1 mainly distributed along a linear structure parallel to the radio jet and, on the other hand, forming a shell-like structure around VLA 2. We have made elliptical fits to the VLA 2 H{sub 2}O maser shell-like structure observed in the different epochs (1999, 2005, and 2007), and found that the shell is still expanding eight years after its discovery. From the difference in the size of the semi-major axes of the fitted ellipses in epochs 1999 ({approx_equal}71 {+-} 1 mas), 2005 ({approx_equal}97 {+-} 3 mas), and 2007 ({approx_equal}111 {+-} 1 mas), we estimate an average expanding velocity of {approx}5 mas yr{sup -1}, similar to the proper motions measured in the individual H{sub 2}O maser features. A kinematic age of {approx}20 yr is derived for this structure. In addition, our VERA observations indicate an increase in the ellipticity of the expanding shell around VLA 2 from epochs 1999 to 2007. In fact, the elliptical fit of the VERA data shows a ratio of the minor and major axes of {approx}0.6, in contrast with an almost circular shape for the shell detected in 1999 and 2005 (b/a {approx} 0.9). This suggests that we are probably observing the formation of a jet-driven H{sub 2}O maser structure in VLA2, evolving from a non-collimated pulsed-outflow event during the first stages of evolution of a massive young stellar object (YSO). This may support predictions made

  5. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  6. ATLAS detector upgrade prospects

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184940; The ATLAS collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb$^{-1}$ expected for LHC running to 3000 fb $^{-1}$ by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ...

  7. ATLAS Detector Upgrade Prospects

    International Nuclear Information System (INIS)

    Dobre, M

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb −1 expected for LHC running by the end of 2018 to 3000 fb −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV. (paper)

  8. The VLA Sky Survey (VLASS): Description and Science Goals

    Science.gov (United States)

    Lacy, Mark; Baum, Stefi Alison; Chandler, Claire J.; Chatterjee, Shami; Murphy, Eric J.; Myers, Steven T.; VLASS Survey Science Group

    2016-01-01

    The VLA Sky Survey (VLASS) will cover 80% of the sky to a target depth of 70muJy in the 2-4GHz S-band of the Karl G. Jansky Very Large Array. With a resolution of 2.5 arcseconds, it will deliver the highest angular resolution of any wide area radio survey. Each area of the survey will be observed in three epochs spaced by 32 months in order to investigate the transient radio source population over an unprecedented combination of depth and area, resulting in a uniquely powerful search for hidden explosions in the Universe. The survey will be carried out in full polarization, allowing the characterization of the magneto-ionic medium in AGN and intervening galaxies over a wide range of redshifts, and the study of Faraday rotating foregrounds such as ionized bubbles in the Milky Way. The high angular resolution will allow us to make unambiguous identifications of nearly 10 million radio sources, comprised of both extragalactic objects and more nearby radio sources in the Milky Way, through matching to wide area optical/IR surveys such as SDSS, PanSTARRS, DES, LSST, EUCLID, WFIRST and WISE. Integral to the VLASS plan is an Education and Public Outreach component that will seek to inform and educate both the scientific community and the general public about radio astronomy through the use of social media, citizen science and educational activities. We will discuss opportunities for community involvement in VLASS, including the development of Enhanced Data Products and Services that will greatly increase the scientific utility of the survey.

  9. VLA-ANGST: A HIGH-RESOLUTION H I SURVEY OF NEARBY DWARF GALAXIES

    International Nuclear Information System (INIS)

    Ott, Jürgen; Stilp, Adrienne M.; Dalcanton, Julianne J.; Warren, Steven R.; Skillman, Evan D.; Walter, Fabian; De Blok, W. J. G.; Koribalski, Bärbel; West, Andrew A.

    2012-01-01

    We present the 'Very Large Array survey of Advanced Camera for Surveys Nearby Galaxy Survey Treasury galaxies (VLA-ANGST)'. VLA-ANGST is a National Radio Astronomy Observatory Large Program consisting of high spectral (0.6-2.6 km s –1 ) and spatial (∼6'') resolution observations of neutral, atomic hydrogen (H I) emission toward 35 nearby dwarf galaxies from the ANGST survey. ANGST is a systematic Hubble Space Telescope survey to establish a legacy of uniform multi-color photometry of resolved stars for a volume-limited sample of nearby galaxies (D ∼ –1 for the majority of the galaxies). The VLA-ANGST data products are made publicly available through a dedicated Web site (https://science.nrao.edu/science/surveys/vla-angst). With available star formation histories from resolved stellar populations and lower resolution ancillary observations from the far-infrared to the ultraviolet, VLA-ANGST will enable detailed studies of the relationship between the ISM and star formation in dwarf galaxies on a ∼100 pc scale.

  10. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  11. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  12. VLITE Surveys the Sky: A 340 MHz Companion to the VLA Sky Survey (VLASS)

    Science.gov (United States)

    Peters, Wendy; Clarke, Tracy; Brisken, Walter; Cotton, William; Richards, Emily E.; Giacintucci, Simona; Kassim, Namir

    2018-01-01

    The VLA Low Band Ionosphere and Transient Experiment (VLITE; ) is a commensal observing system on the Karl G. Janksy Very Large Array (VLA) which was developed by the Naval Research Laboratory and NRAO. A 64 MHz sub-band from the prime focus 240-470 MHz dipoles is correlated during nearly all regular VLA observations. VLITE uses dedicated samplers and fibers, as well as a custom designed, real-time DiFX software correlator, and requires no additional resources from the VLA system running the primary science program. The experiment has been operating since November 2014 with 10 antennas; a recent expansion in summer 2017 increased that number to 16 and more than doubled the number of baselines.The VLA Sky Survey (VLASS; ), is an ongoing survey of the entire sky visible to the VLA at a frequency of 2-4 GHz. The observations are made using an "on-the-fly" (OTF) continuous RA scanning technique which fills in the sky by observing along rows of constant declination. VLITE breaks the data into 2-second integrations and correlates these at a central position every 1.5 degrees. All data for each correlator position is imaged separately, corrected and weighted by an appropriately elongated primary beam model, and then combined in the image plane to create a mosaic of the sky. A catalog of the sources is extracted to provide a 340 MHz sky model.We present preliminary images and catalogs from the 2017 VLASS observations which began in early September, 2017, and continued on a nearly daily basis throughout the fall. In addition to providing a unique sky model at 340 MHz, these data complement VLASS by providing spectral indices for all cataloged sources.

  13. VizieR Online Data Catalog: GRB 160509A VLA monitoring campain results (Laskar+, 2016)

    Science.gov (United States)

    Laskar, T.; Alexander, K. D.; Berger, E.; Fong, W.-F.; Margutti, R.; Shivvers, I.; Williams, P. K. G.; Kopac, D.; Kobayashi, S.; Mundell, C.; Gomboc, A.; Zheng, W.; Menten, K. M.; Graham, M. L.; Filippenko, A. V.

    2017-04-01

    GRB 160509A was discovered by the Fermi LAT on 2016 May 09 at 08:59:04.36 UTC (Longo+ 2016GCN..19403...1L). We observed the afterglow with the VLA starting at 0.36 days. We tracked the flux density of the afterglow over multiple epochs spanning 1.2-33.5GHz, using 3C48, 3C286, and 3C147 as flux and bandpass calibrators, and J2005+7752 as the gain calibrator. Our VLA observations spanning 0.36-20 days after the burst clearly reveal the presence of multiple spectral components in the radio afterglow. (1 data file).

  14. AliPDU Package Upgrade

    CERN Document Server

    "Martin, Michael

    2015-01-01

    "AliPDU Package" is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  15. AliPDU Package Upgrade

    CERN Document Server

    Martin, Michael

    2015-01-01

    AliPDU Package is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  16. Update on the Commensal VLA Low-band Ionospheric and Transient Experiment (VLITE)

    Science.gov (United States)

    Kassim, Namir E.; Clarke, Tracy E.; Ray, Paul S.; Polisensky, Emil; Peters, Wendy M.; Giacintucci, Simona; Helmboldt, Joseph F.; Hyman, Scott D.; Brisken, Walter; Hicks, Brian; Deneva, Julia S.

    2017-01-01

    The JVLA Low-band Ionospheric and Transient Experiment (VLITE) is a commensal observing system on the NRAO JVLA. The separate optical path of the prime-focus sub-GHz dipole feeds and the Cassegrain-focus GHz feeds provided an opportunity to expand the simultaneous frequency operation of the JVLA through joint observations across both systems. The low-band receivers on 10 JVLA antennas are outfitted with dedicated samplers and use spare fibers to transport the 320-384 MHz band to the VLITE correlator. The initial phase of VLITE uses a custom-designed real-time DiFX software correlator to produce autocorrelations, as well as parallel and cross-hand cross-correlations from the linear dipole feeds. NRL and NRAO have worked together to explore the scientific potential of the commensal low frequency system for ionospheric remote sensing, astrophysics and transients. VLITE operates at nearly 70% wall time with roughly 6200 hours of JVLA time recorded each year.VLITE data are used in real-time for ionospheric research and are transferred daily to NRL for processing in the astrophysics and transient pipelines. These pipelines provide automated radio frequency interference excision, calibration, imaging and self-calibration of data.We will review early scientific results from VLITE across all three science focus areas, including the ionosphere, slow (> 1 sec) transients, and astrophysics. We also discuss the future of the project, that includes its planned expansion to eVLITE including the addition of more antennas, and a parallel capability to search for fast (complement NRAO’s 3 GHz VLA Sky Survey (VLASS). Revised pipelines are under development for operation during the on-the-fly operation mode of the sky survey.

  17. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  18. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  19. Ichtyofauna střední části Vlašimské Blanice

    Czech Academy of Sciences Publication Activity Database

    Hanel, L.; Lusk, Stanislav

    2009-01-01

    Roč. 49, č. 1 (2009), s. 43-61 ISSN 0487-5648 Institutional research plan: CEZ:AV0Z60930519 Keywords : ichtyofauna * abundance * electrofishing * River Blanice Vlašimská (Central Bohemia, Czech Republic) * Blaník Protected Landscape Area Subject RIV: EH - Ecology, Behaviour

  20. Increased prevalence of late stage T cell activation antigen (VLA-1) in active juvenile chronic arthritis

    DEFF Research Database (Denmark)

    Ødum, Niels; Morling, Niels; Platz, P

    1987-01-01

    The presence of activated T cells as judged from the reaction with monoclonal antibodies (MoAb) against (a) a late stage T cell activation antigen (VLA-1), (b) the interleukin 2 (IL2) receptor (CD25), and (c) four different HLA class II molecules (HLA-DR, DRw52, DQ, and DP) was studied in 15 pati...

  1. Gravitational lensing statistics with extragalactic surveys - II. Analysis of the Jodrell Bank-VLA Astrometric Survey

    NARCIS (Netherlands)

    Helbig, P; Marlow, D; Quast, R; Wilkinson, PN; Browne, IWA; Koopmans, LVE

    We present constraints on the cosmological constant lambda(0) from gravitational lensing statistics of the Jodrell Bank-VLA Astrometric Survey (JVAS). Although this is the largest gravitational lens survey which has been analysed, cosmological constraints are only comparable to those from optical

  2. Gravitational lensing statistics with extragalactic surveys; 2, Analysis of the Jodrell Bank-VLA Astrometric Survey

    NARCIS (Netherlands)

    Helbig, P.; Marlow, D. R.; Quast, R.; Wilkinson, P. N.; Browne, I. W. A.; Koopmans, L. V. E.

    1999-01-01

    Published in: Astron. Astrophys. Suppl. Ser. 136 (1999) no. 2, pp.297-305 citations recorded in [Science Citation Index] Abstract: We present constraints on the cosmological constant $lambda_{0}$ from gravitational lensing statistics of the Jodrell Bank-VLA Astrometric Survey (JVAS). Although this

  3. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  4. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  5. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  6. Simultaneous Solar Maximum Mission and Very Large Array (VLA) observations of solar active regions. Semiannual Progress Report, 1 February 1985-30 January 1986

    International Nuclear Information System (INIS)

    Lang, K.R.

    1985-08-01

    Simultaneous observations of solar active regions with the Solar Maximum Mission (SMM) Satellite and the Very Large Array (VLA) have been obtained and analyzed. Combined results enhance the scientific return for beyond that expeted from using either SMM or VLA alone. A total of two weeks of simultaneous SMM/VLA data were obtained. The multiple wavelength VLA observations were used to determine the temperature and magnetic structure at different heights within coronal loops. These data are compared with simultaneous SMM observations. Several papers on the subject are in progress. They include VLA observations of compact, transient sources in the transition region; simultaneous SMM/VLA observations of the coronal loops in one active region and the evolution of another one; and sampling of the coronal plasma using thermal cyclotron lines (magnetic field - VLA) and soft X ray spectral lines (electron density and electron temperaure-SMM)

  7. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  8. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  9. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  10. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  11. GBT, VLA Team Up to Produce New Image of Orion Nebula

    Science.gov (United States)

    2002-01-01

    Combining the best features of the National Science Foundation's (NSF) new Robert C. Byrd Green Bank Telescope (GBT) in West Virginia with those of the NSF's Very Large Array (VLA) in New Mexico, astronomers have produced a vastly improved radio image of the Orion Nebula and developed a valuable new technique for studying star formation and other astrophysical processes. GBT-VLA Image of Orion Nebula GBT-VLA Image of Orion Nebula "Our GBT image of the Orion Nebula is the best image ever produced with a single-dish radio telescope and it illustrates the superb performance of this new telescope," said Debra Shepherd, of the National Radio Astronomy Observatory (NRAO) in Socorro, NM. "By combining data from the GBT with that from the VLA, we get an image that reflects reality far better than images from the separate telescopes could do," she added. Shepherd worked with Ron Maddalena from NRAO in Green Bank and Joe McMullin, from NRAO in Socorro. The astronomers presented their work to the American Astronomical Society meeting in Washington, DC. Single-dish radio telescopes such as the GBT, dedicated in 2000, are able to capture the large-scale structure of objects such as the Orion Nebula. However, they are unable to discern the fine detail revealed by multi-antenna arrays such as the VLA. Conversely, a VLA-like array is "blind" to the larger-scale structures. Combining the data from both types of radio telescopes to produce an image showing both large- and small-scale structures in the same celestial object has been a difficult, laborious task. "We are developing new observing techniques and software to make this task much easier and quicker," said McMullin. "We now have achieved in hours what used to take months or even longer to do, but we are producing an observational tool that will allow astronomers to make much higher-fidelity images that will greatly improve our understanding of several important astronomical processes," McMullin added. For this observation

  12. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  13. Upgrading across Organisational and Geographical Configurations : Analysis of the Chinese Automotive Industry

    NARCIS (Netherlands)

    E. van Tuijl (Erwin)

    2015-01-01

    markdownabstract__Abstract__ This thesis deals with upgrading: a process of learning and knowledge sourcing in order to generate value added. We analyse how upgrading takes place across various organisational configurations: formal collaboration, clusters, projects, and events. Moreover, we

  14. Quality control of a 2 m{sup 2} Micromegas detector for the ATLAS muon spectrometer upgrade project using contact CCDs

    Energy Technology Data Exchange (ETDEWEB)

    Biebel, Otmar; Hertenberger, Ralf; Wagner-Kuhr, Jeannine [LMU, Munich (Germany); Wellenstein, Hermann [Brandeis University, Waltham (United States)

    2016-07-01

    The inner endcap region of the ATLAS muon spectrometer, the Small Wheel, will be upgraded in 2019 using Micromegas detectors to retain the tracking performance after the LHC luminosity upgrade. In the new Small Wheel Micromegas detectors will be arranged in trapezoidal quadruplets of four active layers each and 2-3 m{sup 2} in size. Guaranteeing the design spatial resolution of 100 μm poses a huge challenge for the mechanical precision of each readout plane and the alignment between the 4 planes. We report about a novel optical alignment tool based on Contact CCDs and coded masks which will be used for the quality control during the construction of the Micromegas detectors. Using pictures of an arbitrary cutout of a coded mask on a readout board taken by a Contact CCD the relative position of the mask with respect to the center of the Contact-CCD can be determined on sub μm accuracy. Together with a calibrated reference device the position of masks within a single plane but also within a quadruplet can be measured with high precision allowing to monitor the relative position of the 3 PowerCircuitBoards within a single plane and the relative alignment between the different planes in a quadruplet. In this presentation the ideas of this new optical alignment tool are shown as well as first quality control studies using a Contact-CCD.

  15. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  16. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  17. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  18. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  19. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  20. Simultaneous Solar Maximum Mission (SMM) and Very Large Array (VLA) observations of solar active regions

    Science.gov (United States)

    Willson, Robert F.

    1991-01-01

    Very Large Array observations at 20 cm wavelength can detect the hot coronal plasma previously observed at soft x ray wavelengths. Thermal cyclotron line emission was detected at the apex of coronal loops where the magnetic field strength is relatively constant. Detailed comparison of simultaneous Solar Maximum Mission (SMM) Satellite and VLA data indicate that physical parameters such as electron temperature, electron density, and magnetic field strength can be obtained, but that some coronal loops remain invisible in either spectral domain. The unprecedent spatial resolution of the VLA at 20 cm wavelength showed that the precursor, impulsive, and post-flare components of solar bursts originate in nearby, but separate loops or systems of loops.. In some cases preburst heating and magnetic changes are observed from loops tens of minutes prior to the impulsive phase. Comparisons with soft x ray images and spectra and with hard x ray data specify the magnetic field strength and emission mechanism of flaring coronal loops. At the longer 91 cm wavelength, the VLA detected extensive emission interpreted as a hot 10(exp 5) K interface between cool, dense H alpha filaments and the surrounding hotter, rarefield corona. Observations at 91 cm also provide evidence for time-correlated bursts in active regions on opposite sides of the solar equator; they are attributed to flare triggering by relativistic particles that move along large-scale, otherwise-invisible, magnetic conduits that link active regions in opposite hemispheres of the Sun.

  1. Searching for MHz Transients with the VLA Low-band Ionosphere and Transient Experiment (VLITE)

    Science.gov (United States)

    Polisensky, Emil; Peters, Wendy; Giacintucci, Simona; Clarke, Tracy; Kassim, Namir E.; hyman, Scott D.; van der Horst, Alexander; Linford, Justin; Waldron, Zach; Frail, Dale

    2018-01-01

    NRL and NRAO have expanded the low frequency capabilities of the VLA through the VLA Low-band Ionosphere and Transient Experiment (VLITE, http://vlite.nrao.edu/ ), effectively making the instrument two telescopes in one. VLITE is a commensal observing system that harvests data from the prime focus in parallel with normal Cassegrain focus observing on a subset of VLA antennas. VLITE provides over 6000 observing hours per year in a > 5 square degree field-of-view using 64 MHz bandwidth centered on 352 MHz. By operating in parallel, VLITE offers invaluable low frequency data to targeted observations of transient sources detected at higher frequencies. With arcsec resolution and mJy sensitivity, VLITE additionally offers great potential for blind searches of rarer radio-selected transients. We use catalog matching software on the imaging products from the daily astrophysics pipeline and the LOFAR Transients Pipeline (TraP) on repeated observations of the same fields to search for coherent and incoherent astronomical transients on timescales of a few seconds to years. We present the current status of the VLITE transient science program from its initial deployment on 10 antennas in November 2014 through its expansion to 16 antennas in the summer of 2017. Transient limits from VLITE’s first year of operation (Polisensky et al. 2016) are updated per the most recent analysis.

  2. Process of establishing design requirements and selecting alternative configurations for conceptual design of a VLA

    Directory of Open Access Journals (Sweden)

    Bo-Young Bae

    2017-04-01

    Full Text Available In this study, a process for establishing design requirements and selecting alternative configurations for the conceptual phase of aircraft design has been proposed. The proposed process uses system-engineering-based requirement-analysis techniques such as objective tree, analytic hierarchy process, and quality function deployment to establish logical and quantitative standards. Moreover, in order to perform a logical selection of alternative aircraft configurations, it uses advanced decision-making methods such as morphological matrix and technique for order preference by similarity to the ideal solution. In addition, a preliminary sizing tool has been developed to check the feasibility of the established performance requirements and to evaluate the flight performance of the selected configurations. The present process has been applied for a two-seater very light aircraft (VLA, resulting in a set of tentative design requirements and two families of VLA configurations: a high-wing configuration and a low-wing configuration. The resulting set of design requirements consists of three categories: customer requirements, certification requirements, and performance requirements. The performance requirements include two mission requirements for the flight range and the endurance by reflecting the customer requirements. The flight performances of the two configuration families were evaluated using the sizing tool developed and the low-wing configuration with conventional tails was selected as the best baseline configuration for the VLA.

  3. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  4. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  5. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  6. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  7. Upgrades to the ISIS moderator configuration

    International Nuclear Information System (INIS)

    Taylor, A.D.

    1989-01-01

    The current ISIS moderator configuration, was designed in 1980 to provide a flexible set of beams for a hypothetical instrument suite. The use of fluid moderators at three different temperatures offering six faces to the instruments, has proved to be effective. In this paper we discuss an upgrade of these moderators in the light of the current and projected instrument configuration. (author)

  8. The Phase-2 ATLAS ITk Pixel Upgrade

    CERN Document Server

    Rossi, Leonardo Paolo; The ATLAS collaboration

    2018-01-01

    The upgrade of the ATLAS experiment for the operation at the High Luminosity Large Hadron Collider requires a new and more performant inner tracker, the ITk. The innermost part of this tracker will be built using silicon pixel detectors. This paper describes the ITk pixel project, which, after few years of design and test e ort, is now defined in detail.

  9. Fermilab Linac Upgrade Conceptual Design: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1989-07-01

    The goal of the Tevatron Collider Upgrade program is to improve the Collider luminosity and the fixed-target intensity. The Linac portion of this project will increase the energy of the existing 200- MeV linac to 400 MeV in order to reduce beam emittance degradation in the Booster.

  10. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  11. Comparative Measurements of the Photon Detection Efficiency of KETEK SiPM Detectors for the LHCb SciFi Upgrade Project

    CERN Document Server

    Joram, Christian

    2014-01-01

    The LHCb SciFi detector is conceived to employ arrays of SiPM detectors to detect scintillation light from ribbons of 2.5 m long scintillating fibres of 250 $\\mu$m diameter. The fibres of type Kuraray SCSF-78 are blue emitting with an emission maximum at 440 nm. However, as a consequence of the radiation damage mainly from charged hadrons in the LHCb experiments, the effective emission spectrum at the end of the fibre will shift to longer wavelengths. A simulation of the light absorption in the fibre, assuming an ionizing dose distribution along the fibre as predicted by the FLUKA code, is able to predict the emission spectrum. Fig. 1 shows the emission spectra (in arbitrary units) for 10 cm intervals along the fibre. At 250 cm, where the ionization dose is expected to reach over the full lifetime of the upgrade LHCb detector about 30 kGy, the average wavelength of emission is approximately 500 nm. The sensitivity spectrum of the SiPM detector should be tuned to match this emission spectrum, i.e. the PDE shou...

  12. Instrumentation and control doctrine for VVER upgrading

    International Nuclear Information System (INIS)

    Pernette, R.; Cucciniello, J.; Trebot, R.

    1997-01-01

    The main results are reported of analyses carried out on the WWER-400 and WWER-1000 series, and the reasons are summed up underlying the decision to establish a policy of WWER instrumentation and control upgrading. It is shown that such a policy forms a key stage in any upgrading project and contributes to the improvement of reactor safety at several levels: it helps to optimize the integration of safety requirements; it makes it easier to achieve a high level of automation and a better man-machine interaction; it should raise the culture of reactor safety. Four annexes demonstrate the factual fundamentals and structure of such a policy. (A.K.)

  13. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  14. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  15. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  16. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  17. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  18. Upgrade of Instrumentation for Purdue Reactor PUR-1

    International Nuclear Information System (INIS)

    Revankar, S.T.; Merritt, E.; Bean, R.

    2000-01-01

    The major objective of this program was to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective two projects on instrument upgrade were implemented. The first one was to convert the vacuum tube control and safety amplifiers (CSA) to solid state electronics, and the other was to upgrade the electrical and electronic shielding. This report is the annual report and gives the efforts and progress achieved on these two projects from July 1999 to June 2000

  19. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  20. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  1. Treat upgrade fuel fabrication

    International Nuclear Information System (INIS)

    Davidson, K.V.; Schell, D.H.

    1979-01-01

    An extrusion and thermal treatment process was developed to produce graphite fuel rods containing a dispersion of enriched UO 2 . These rods will be used in an upgraded version of the Transient Reactor Test Facility (TREAT). The improved fuel provides a higher graphite matrix density, better fuel dispersion and higher thermal capabilities than the existing fuel

  2. ATLAS Pixel Detector Upgrade

    CERN Document Server

    Flick, T; The ATLAS collaboration

    2009-01-01

    The first upgrade for higher luminosity at LHC for the ATLAS pixel detector is the insertion of a forth layer, the IBL. The talk gives an overview about what the IBL is and how it will be set up, as well as to give a status of the research and develoment work.

  3. Upgrading Undergraduate Biology Education

    Science.gov (United States)

    Musante, Susan

    2011-01-01

    On many campuses throughout the country, undergraduate biology education is in serious need of an upgrade. During the past few decades, the body of biological knowledge has grown exponentially, and as a research endeavor, the practice of biology has evolved. Education research has also made great strides, revealing many new insights into how…

  4. Upgrade of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, work will be carried out on the CERN switching centre between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  5. VLITE-Fast: A Real-time, 350 MHz Commensal VLA Survey for Fast Transients

    Science.gov (United States)

    Kerr, Matthew; Ray, Paul S.; Kassim, Namir E.; Clarke, Tracy; Deneva, Julia; Polisensky, Emil

    2018-01-01

    The VLITE (VLA Low Band Ionosphere and Transient Experiment; http://vlite.nrao.edu) program operates commensally during all Very Large Array observations, collecting data from 320 to 384 MHz. Recently expanded to include 16 antennas, the large field of view and huge time on sky offer good coverage of the transient, low-frequency sky. We describe the VLITE-Fast system, a GPU-based signal processor capable of detecting short (system, techniques for mitigating interference, and initial results from searches for FRBs.

  6. Multifrequency VLA observations of PKS 0745-191: the archetypal 'cooling flow' radio source?

    International Nuclear Information System (INIS)

    Baum, S.A.; O'Dea, C.P.

    1991-01-01

    We present 90-, 20-, 6- and 2-cm VLA observations of the high radio luminosity, cooling flow radio source PKS 0745-191. We find that the radio source has a core with a very steep spectrum and diffuse emission with an even steeper spectrum without clear indications of the jets, hotspots or double lobes found in other radio sources of comparable luminosity. The appearance of the source is highly dependent on frequency and resolution. This dependence reflects both the diffuse nature of the extended emission and the steep, but position-dependent, spectrum of the radio emission. (author)

  7. BNFL Magnox - Upgrades and enhancements

    International Nuclear Information System (INIS)

    Udbinac, M.J.

    2006-01-01

    In the past, generic models, restrictive budgets,and general shortages of resources have limited the scope of the UK's older Magnox simulators. Nevertheless, the simulators evolved slowly over time, becoming more like their reference plants, as resources became available. Three years ago, the Training and Development Branch of Magnox Electric plc took a giant leap, investing significant resources into the modernization of their training simulators. New hardware was built, including a new simulator room. The simulator software was ported from Unix running on outdated servers to new servers running Microsoft Windows NT. Perhaps most significantly, major model enhancements were made to key plant systems to significantly increase the likeness of each simulator to its reference plant. The upgrade to NT, the addition of state-of-the-art instructor stations, and some of the model enhancements were achieved with SimPort, an all-inclusive simulation package provided by DS and S. This paper will provide a more detailed view of the Magnox modular simulators, including how they are used and how they have benefited from the enhancements and upgrades implemented during the project. (author)

  8. LS1: electrical engineering upgrades and consolidation

    International Nuclear Information System (INIS)

    Duval, F.

    2012-01-01

    3 different types of activities are planned by the Engineering Department Electrical Engineering (EN-EL) Group for the first long shut down (LS1). First, the consolidation of EN-EL's ageing infrastructure elements. It is part of a 15- year programme aiming at increasing the reliability and availability of the power distribution network. Secondly, the maintenance of the accelerators infrastructure. In addition to the usual periodic operations and those delayed until LS1, the group will address more demanding activities like the replacement campaigns for irradiated cables and non-radiation resistant fibres as well as the removal of unused cables in particularly overcrowded areas. Thirdly, a vast amount of user copper and optical fibre cabling requests: EN-EL estimates that only 50% of LS1 requests are currently known. The main activities will be EN-EL's contributions to the R2E project, BE-BI upgrade projects, and the RF upgrade project in SPS BA3

  9. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  10. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  11. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  12. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  13. VLA limits for comets Austin (1982 VI) and P/Crommelin (1983n) - evidence for a diffuse OH halo

    International Nuclear Information System (INIS)

    Schenewerk, M.S.; Palmer, P.; Snyder, L.E.; De Pater, I.; Chicago Univ., IL; Illinois Univ., Urbana; California Univ., Berkeley)

    1986-01-01

    Unsuccessful searches of Comet Austin (1982 VI = 1982g) and Comet P/Crommelin (1983n) for 18 cm wavelength OH emission or absorption and for continuum emission have been made with the VLA. The results of the OH searches of both comets and the 2 cm wavelength continuum search for Comet P/Crommelin are given here. The detection of OH emission and absorption in both comets with single-element telescopes and the nondetection of OH with the VLA are interpreted as evidence for a diffuse OH halo. The nondetection of continuum emission supports the growing body of observational evidence against the conventional icy-grain halo theory. 20 references

  14. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  15. The CDF upgrade

    International Nuclear Information System (INIS)

    Newman-Holmes, C.

    1995-01-01

    The Collider Detector at Fermilab (CDF) has been used to study proton-antiproton collisions at the Fermilab Tevatron since 1985. Over the years, the detector has evolved steadily to increase its physics capability and to keep pace with improvements to the Tevatron. Fermilab is currently building a new Main Injector accelerator which will lead to even larger luminosity values. This paper describes upgrades to CDF that will allow one to exploit the higher luminosity of the Main Injector

  16. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  17. Design assessment for Melton Valley liquid low-level waste collection and transfer system upgrade project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-10-01

    This project is designed for collecting liquid low level waste (LLLW) from generating points inside the Radioisotope Engineering and Development Center (Buildings 7920 and 7930) facility and transferring this waste to the Collection Tank (F-1800) in the new Monitoring and Control Station (MCS) facility. The LLLW is transferred to the MCS in a new, underground, jacketed, stainless steel piping system. The LLLW will then be transferred from Tank F-1800 through a new, underground, jacketed, stainless steel piping system that connects the existing Bethel Valley LLLW Collection System and the Evaporator Facility Service Tanks. The interface for the two systems will be at the existing Interconnecting Pipe Line (ICPL) Valve Box adjacent to the Nonradiological Wastewater Treatment Plant. The project scope consists of the following systems: (1) Building 7920 LLLW Collection System; (2) Building 7930 LLLW Collection System; (3) LLLW Underground Transfer System to MCS; (4) MCS Building (including all equipment contained therein); (5) LLLW Underground Transfer System to ICPL Valve Box; and (6) Leak detection system for jacketed piping systems (3) and (5)

  18. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  19. The D0 upgrade

    International Nuclear Information System (INIS)

    Tuts, P.M.

    1992-10-01

    The original D0 detector was proposed in 1983, with a focus on high P T physics using precision measurements of e's, μ's, jets, and missing E T . This detector, as of the summer of 1992, has started data taking at the Fermilab Collider. However, by 1995/6 the luminosity will reach 10 31 cm -2 sec -1 , and the minimum bunch spacing will drop to 396ns from the present 3.5μs (by the Main Injector era, luminosities will approach 10 32 cm -2 sec -1 and minimum bunch spacings may reach 132ns). These changes in the accelerator conditions force us to upgrade or replace a number of detector subsystems in order to meet these new demands. In addition, the upgrade offers us the opportunity to expand the physics horizons to include not only the all important high P T physics menu, but also the low P T physics that has become increasingly important. In this paper we describe the D0 detector upgrade

  20. The LHCb VELO upgrade

    International Nuclear Information System (INIS)

    Rodríguez Pérez, Pablo

    2013-01-01

    LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to 2×10 33 cm −2 s −1 and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to 5×10 15 1 MeV n eq /cm 2 in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55×55μm 2 pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results

  1. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  2. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  3. Computer codes used during upgrading activities at MINT TRIGA reactor

    International Nuclear Information System (INIS)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd Idris Taib

    1999-01-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  4. Small-scale upgrading and refinement of biogas; Smaaskalig uppgradering och foeraedling av biogas

    Energy Technology Data Exchange (ETDEWEB)

    Blom, Helena; Mccann, Michael; Westman, Johan (Poeyry SwedPower AB, Stockholm (Sweden))

    2012-02-15

    Small-scale upgrading and refinement of biogas is a report which aims to compile the state of knowledge in small-scale biogas upgrading. The project have been a collaboration with Agrovaest and Energy Farm and was funded by the Foundation for Agricultural Research, Western Goetaland and the Agriculture Department. The technology available for small scale upgrade has been examined from the technical and economic standpoint. An economic comparison has been made and the production of upgraded biogas has been estimated for different raw gas flows. The work also contains information related to biogas production, upgrading and a comparison of liquid biogas, DME and Ecopar-diesel

  5. Instrument hardware and software upgrades at IPNS

    International Nuclear Information System (INIS)

    Worlton, Thomas; Hammonds, John; Mikkelson, D.; Mikkelson, Ruth; Porter, Rodney; Tao, Julian; Chatterjee, Alok

    2006-01-01

    IPNS is in the process of upgrading their time-of-flight neutron scattering instruments with improved hardware and software. The hardware upgrades include replacing old VAX Qbus and Multibus-based data acquisition systems with new systems based on VXI and VME. Hardware upgrades also include expanded detector banks and new detector electronics. Old VAX Fortran-based data acquisition and analysis software is being replaced with new software as part of the ISAW project. ISAW is written in Java for ease of development and portability, and is now used routinely for data visualization, reduction, and analysis on all upgraded instruments. ISAW provides the ability to process and visualize the data from thousands of detector pixels, each having thousands of time channels. These operations can be done interactively through a familiar graphical user interface or automatically through simple scripts. Scripts and operators provided by end users are automatically included in the ISAW menu structure, along with those distributed with ISAW, when the application is started

  6. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  7. FAINT RADIO-SOURCES WITH PEAKED SPECTRA .1. VLA OBSERVATIONS OF A NEW SAMPLE WITH INTERMEDIATE FLUX-DENSITIES

    NARCIS (Netherlands)

    SNELLEN, IAG; ZHANG, M; SCHILIZZI, RT; ROTTGERING, HJA; DEBRUYN, AG; MILEY, GK

    We present 2 and 20 cm observations with the VLA of 25 candidate peaked spectrum radio sources. These data combined with those from earlier surveys have allowed us to construct radio spectra spanning a range of frequency from 0.3 to 15 GHz. Ten of the 25 sources are found to be variable with no

  8. Endothelium adhesion molecules ICAM-1, ICAM-2, VCAM-1 and VLA-4 expression in leprosy.

    Science.gov (United States)

    de Sousa, Juarez; Sousa Aarão, Tinara Leila; Rodrigues de Sousa, Jorge; Hirai, Kelly Emi; Silva, Luciana Mota; Dias, Leonidas Braga; Oliveira Carneiro, Francisca Regina; Fuzii, Hellen Thais; Quaresma, Juarez Antonio Simões

    2017-03-01

    Leprosy triggers a complex relationship between the pathogen and host immune response. Endothelium plays an important role in this immune response by directly influencing cell migration to infected tissues. The objective of this work is to investigate the possible role of endothelium in M. leprae infection, correlating the characteristics of endothelial markers with the expression pattern of cytokines. Thirty-six skin biopsy samples were cut into 5-μm thick sections and stained with hematoxylin-eosin and Ziehl-Neelsen for morphological analysis and then submitted to immunohistochemical analysis using monoclonal antibodies against ICAM-1, ICAM-2, VCAM-1, and VLA-4. Immunostaining for ICAM-1 showed a significantly larger number of stained endothelial cells in the tuberculoid leprosy (9.92 ± 1.11 cells/mm 2 ) when compared to lepromatous samples (5.87 ± 1.01 cells/mm 2 ) and ICAM-2 revealed no significant difference in the number of endothelial cells expressing this marker between the tuberculoid (13.21 ± 1.27 cells/mm 2 ) and lepromatous leprosy (14.3 ± 1.02 cells/mm 2 ). VCAM-1-immunostained showed 18.28 ± 1.46/mm 2 cells in tuberculoid leprosy and 10.67 ± 1.25 cells/mm 2 in the lepromatous leprosy. VLA-4 exhibited 22.46 ± 1.38 cells/mm 2 in the tuberculoid leprosy 16.04 ± 1.56 cells/mm 2 in the lepromatous leprosy. Samples with characteristics of the tuberculoid leprosy exhibited a larger number of cells stained with ICAM-1, VCAM-1 and VLA-4, demonstrating the importance of these molecules in the migration and selection of cells that reach the inflamed tissue. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators

  10. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  11. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    International Nuclear Information System (INIS)

    Neumeyer, C.; Avasarala, S.; Chrzanowski, J.; Dudek, L.; Fan, H.; Hatcher, H.; Heitzenroeder, P.; Menard, J.; Ono, M.; Ramakrishnan, S.; Titus, P.; Woolley, R.; Zhan, H.

    2009-01-01

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ∼ 3 and makes possible higher levels of performance and pulse duration.

  12. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  13. Upgrade Software and Computing

    CERN Document Server

    The LHCb Collaboration, CERN

    2018-01-01

    This document reports the Research and Development activities that are carried out in the software and computing domains in view of the upgrade of the LHCb experiment. The implementation of a full software trigger implies major changes in the core software framework, in the event data model, and in the reconstruction algorithms. The increase of the data volumes for both real and simulated datasets requires a corresponding scaling of the distributed computing infrastructure. An implementation plan in both domains is presented, together with a risk assessment analysis.

  14. Upgrading Enterprise Search

    Energy Technology Data Exchange (ETDEWEB)

    McDunn, R

    2005-04-28

    This presentation will describe the process we went through this past year to upgrade our enterprise search tool from a very old version of Inktomi to the latest version of Verity Ultraseek. We started with requirements gathering and then compared requirements against several available products to determine which product to choose. After purchasing the product, we worked through several defined phases of implementation and customization, with initial rollout late January 2004. Finally, we will show you where we are today and describe future search plans.

  15. Upgrade, rebuild or replace?

    International Nuclear Information System (INIS)

    Forbes, C.A.

    1990-01-01

    Ageing reactor simulators present some tough decisions for utility managers. Although most utilities have chosen the cheaper, upgrading solution as the best compromise between costs and outage length, some US utilities have found that for them, replacement represents the best option. Simulators may be less than ten years old, but they have limited instructor systems, older low fidelity models that cannot reproduce important training scenarios, and out of date, difficult to maintain computers that do not permit much expansion of the models anyway. Perhaps worse than this is the possibility that the simulator may no longer be a faithful reproduction of the referenced plant, or have poor (or non-existent) documentation. (author)

  16. Precise VLA positions and flux-density measurements of the Jupiter system

    International Nuclear Information System (INIS)

    Muhleman, D.O.; Berge, G.L.; Rudy, D.; Niell, A.E.

    1986-01-01

    VLA C array configuration observations at 2 and 6 cm are presented for Europa, Ganymede, and Callisto at eastern and western elongations with respect to Jupiter, which allowed measurements in right ascension and declination of the satellites with an rms precision of about + or - 0.03 arcsec. The transfer of the mean offsets of Ganymede to Jupiter yields offsets of -0.185 + or - 0.03 arcsec and -0.06 + or - 0.03 arcsec, with respect to JPL-DE-200, at the mean epoch of April 28, 1983; the large offset in right ascension is a combination of the Jupiter ephemeris error and the error in the frame tie of the Jovian planets with the VLBI system of precise positions which was used as the absolute reference frame for the observations. A significant error is noted in the orbital position of Callisto with respect to Ganymede. 12 references

  17. VLA Ammonia Observations of IRAS 16253-2429: A Very Young and Low Mass Protostellar System

    Science.gov (United States)

    Wiseman, Jennifer J.

    2011-01-01

    IRAS l6253-2429. the source of the Wasp-Waist Nebula seen in Spitzer IRAC images, is an isolated very low luminosity ("VeLLO") Class 0 protostar in the nearby rho Ophiuchi cloud. We present VLA ammonia mapping observations of the dense gas envelope feeding the central core accreting system. We find a flattened envelope perpendicular to the outflow axis, and gas cavities that appear to cradle the outflow lobes as though carved out by the flow and associated (apparently precessing) jet. Based on the NH3 (1,1) and (2,2) emission distribution, we derive the mass, velocity fields and temperature distribution for the envelope. We discuss the combined evidence for this source as possibly one of the youngest and lowest mass sources in formation yet known.

  18. SLHC, the High-Luminosity Upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  19. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  20. Plans for the upgrade of the LHC injectors

    CERN Document Server

    Garoby, R; Goddard, B; Hanke, K; Meddahi, M; Vretenar, M

    2011-01-01

    The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN accelerator complex for reliably providing beam with the challenging characteristics required by the high luminosity LHC until at least 2030. Based on the work already started on Linac4, PS Booster, PS and SPS, the LIU project coordinates studies and implementation, and interfaces with the high luminosity LHC (HL-LHC) project which looks after the upgrade of the LHC itself, expected by the end of the present decade. The anticipated beam characteristics are described, as well as the status of the studies and the solutions envisaged for improving the injector performances.

  1. LHCb VELO Upgrade

    CERN Document Server

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  2. T Plant secondary containment and leak detection upgrades

    International Nuclear Information System (INIS)

    Carlson, T.A.

    1995-01-01

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site

  3. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  4. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  5. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  6. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  7. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  8. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  9. Proposed Fermilab upgrade main injector project

    International Nuclear Information System (INIS)

    1992-04-01

    The US Department of Energy (DOE) proposes to construct and operate a ''Fermilab Main Injector'' (FMI), a 150 GeV proton injector accelerator, at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The purpose and need for this action are given of this Environmental Assessment (EA). A description of the proposed FMI and construction activities are also given. The proposed FMI would be housed in an underground tunnel with a circumference of approximately 2.1 miles (3.4 kilometers), and the construction would affect approximately 135 acres of the 6,800 acre Fermilab site. The purpose of the proposed FMI is to construct and bring into operation a new 150 GeV proton injector accelerator. This addition to Fermilab's Tevatron would enable scientists to penetrate ever more deeply into the subatomic world through the detection of the super massive particles that can be created when a proton and antiproton collide head-on. The conversion of energy into matter in these collisions makes it possible to create particles that existed only an instant after the beginning of time. The proposed FMI would significantly extend the scientific reach of the Tevatron, the world's first superconducting accelerator and highest energy proton-antiproton collider

  10. The Fermilab ACNET upgrade

    International Nuclear Information System (INIS)

    Briegel, C.; Johnson, G.; Winterowd, L.

    1990-01-01

    The Fermilab Accelerator Controls Network (ACNET) upgrade consists of a new physical medium (IEEE 802.5 token ring), additions to the calling sequence and added processor support. ACNET is the accelerator control backbone network for all data communication. A proprietary network was replaced by an IEEE standard enabling an open network with excellent characteristics for the control system. The calling sequence was enhanced for the added capabilities of the token-ring interface such as 'gather-read' and 'scatter-write'. In addition to prior support of DEC PDP11s under RS11M and VAXs under VMS, the ACNET calling sequence was implemented in the language C for the IBM PC with MS-DOS and Motorola 680x0 with MTOS using VME bus. Additional support is in progress for Intel 80x86 with MTOS using Multibus II. (orig.)

  11. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  12. ISTTOK control system upgrade

    International Nuclear Information System (INIS)

    Carvalho, Ivo S.; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-01-01

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel ® Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators

  13. How Do Multiple-Star Systems Form? VLA Study Reveals "Smoking Gun"

    Science.gov (United States)

    2006-12-01

    Astronomers have used the National Science Foundation's Very Large Array (VLA) radio telescope to image a young, multiple-star system with unprecedented detail, yielding important clues about how such systems are formed. Most Sun-sized or larger stars in the Universe are not single, like our Sun, but are members of multiple-star systems. Astronomers have been divided on how such systems can form, producing competing theoretical models for this process. Multiple Star Formation Graphic Proposed Formation Process for L1551 IRS5 CREDIT: Bill Saxton, NRAO/AUI/NSF Click on image for page of graphics and full information The new VLA study produced a "smoking gun" supporting one of the competing models, said Jeremy Lim, of the Institute of Astronomy & Astrophysics, Academia Sinica, in Taipei, Taiwan, whose study, done with Shigehisa Takakuwa of the National Astronomical Observatory of Japan, is published in the December 10 issue of the Astrophysical Journal. Ironically, their discovery of a third, previously-unknown, young star in the system may support a second theoretical model. "There may be more than one way to make a multiple-star system," Lim explained. The astronomers observed an object called L1551 IRS5, young, still-forming protostars enshrouded in a cloud of gas and dust, some 450 light-years from Earth in the direction of the constellation Taurus. Invisible to optical telescopes because of the gas and dust, this object was discovered in 1976 by astronomers using infrared telescopes. A VLA study in 1998 showed two young stars orbiting each other, each surrounded by a disk of dust that may, in time, congeal into a system of planets. Lim and Takakuwa re-examined the system, using improved technical capabilities that greatly boosted the quality of their images. "In the earlier VLA study, only half of the VLA's 27 antennas had receivers that could collect the radio waves, at a frequency of 43 GigaHertz (GHz), coming from the dusty disks. When we re-observed this

  14. Siemens tasks and activities during gradual upgrading

    International Nuclear Information System (INIS)

    Kuehne, B.

    2001-01-01

    The gradual upgrading of NPP V1 Bohunice constitutes the most extensive reconstruction project to be performed in an operational WWER plant to date. It constitutes a milestone in Siemens co-operation on projects for WWERs to date and is an encouraging example for the successful combination of western and eastern safety cultures. During the runtime of this project Siemens learnt very much about the 'complete function' as well as the details of this WWER plant type. In contrast the Slovakian partners really gained a much better understanding for the western approach to ensure safety, for the most modern safety technology, in particular for instrumentation and control, and last but not least or advanced project management. (author)

  15. Upgraded RECOVER system - CASDAC system

    International Nuclear Information System (INIS)

    Yamamoto, Yoichi; Koyama, Kinji

    1992-03-01

    The CASDAC (Containment And Surveillance Data Authenticated Communication) system has been developed by JAERI for nuclear safeguards and physical protection of nuclear material. This system was designed and constructed as an upgraded RECOVER system, design concept of which was based on the original RECOVER system and also the TRANSEAVER system. Both of them were developed several years ago as a remote monitoring system for continual verification of security and safeguards status of nuclear material. The system consists of two subsystems, one of them is a Grand Command Center (GCC) subsystem and the other is a facility subsystem. Communication between the two subsystems is controlled through the international telephone line network. Therefore all communication data are encrypted to prevent access by an unauthorized person who may intend to make a falsification, or tapping. The facility subsystem has an appropriate measure that ensure data security and reliable operation under unattended mode of operator. The software of this system is designed so as to be easily used in other different types of computers. This report describes the outline of the CASDAC system and the results of its performance test. This work has been carried out in the framework of Japan Support Programme for Agency Safeguards (JASPAS) as a project, JA-1. (author)

  16. CHANDRA, KECK, AND VLA OBSERVATIONS OF THE CRAB NEBULA DURING THE 2011-APRIL GAMMA-RAY FLARE

    Energy Technology Data Exchange (ETDEWEB)

    Weisskopf, Martin C.; Tennant, Allyn F.; O' Dell, Stephen L. [NASA Marshall Space Flight Center, Astrophysics Office (ZP12), Huntsville, AL 35812 (United States); Arons, Jonathan [Astronomy Department and Theoretical Astrophysics Center, University of California, Berkeley, 601 Campbell Hall, Berkeley, CA 94720 (United States); Blandford, Roger; Funk, Stefan; Romani, Roger W. [W. W. Hansen Experimental Physics Laboratory, Kavli Institute for Particle Astrophysics and Cosmology, Department of Physics and SLAC National Accelerator Laboratory, Stanford University, Stanford, CA 94305 (United States); Buehler, Rolf [DESY, Platanenallee 6, D-15738 Zeuthen (Germany); Caraveo, Patrizia; De Luca, Andrea [INAF-IASF Milano, via E. Bassini 15, I-20133 Milano (Italy); Cheung, Chi C. [National Research Council Research Associate, National Academy of Sciences, Washington, DC 20001 (United States); Costa, Enrico [INFN Roma Tor Vergata, via della Ricerca Scientifica 1, I-00133 Roma (Italy); Ferrigno, Carlo [ISDC, Data Center for Astrophysics of the University of Geneva, chemin d' cogia 16, CH-1290 Versoix (Switzerland); Fu, Hai [Department of Physics and Astronomy, University of California, Irvine, CA 92697 (United States); Habermehl, Moritz; Horns, Dieter [Institut fuer Experimentalphysik, Universitaet Hamburg, Luruper Chaussee 149, D-22761 Hamburg (Germany); Linford, Justin D. [Department of Physics and Astronomy, University of New Mexico, MSC07 4220, Albuquerque, NM 87131-0001 (United States); Lobanov, Andrei [Max-Planck-Institut fuer Radioastronomie, Auf dem Huegel 69, D-53121 Bonn (Germany); Max, Claire [Department of Astronomy and Astrophysics, University of California, Santa Cruz, CA 95064 (United States); Mignani, Roberto [Mullard Space Science Laboratory, University College London, Holmbury St. Mary Dorking, Surrey RH5 6NT (United Kingdom); and others

    2013-03-01

    We present results from our analysis of Chandra X-Ray Observatory, W. M. Keck Observatory, and Karl G. Jansky Very Large Array (VLA) images of the Crab Nebula that were contemporaneous with the {gamma}-ray flare of 2011 April. Despite hints in the X-ray data, we find no evidence for statistically significant variations that pinpoint the specific location of the flares within the Nebula. The Keck observations extend this conclusion to the 'inner knot', i.e., the feature within an arcsecond of the pulsar. The VLA observations support this conclusion. We also discuss theoretical implications of the {gamma}-ray flares and suggest that the most dramatic {gamma}-ray flares are due to radiation-reaction-limited synchrotron emission associated with sudden, dissipative changes in the current system sustained by the central pulsar.

  17. VizieR Online Data Catalog: The VLA Low-frequency Sky Survey at 74MHz (Perley+ 2006)

    Science.gov (United States)

    Perley, R. A.; Condon, J. J.; Cotton, W. D.; Cohen, A. S.; Lane, W. M.; Kassim, N. E.; Lazio, T. J. W.; Erickson, W. C.

    2006-08-01

    The VLA Low-Frequency Sky Survey (VLSS) is a 74MHz (4m) continuum survey covering the entire sky north of -30{deg} declination. Using the VLA in B- and BnA-configurations, we will map the entire survey region at a resolution of 80" and with an average rms noise of 0.1 Jy/beam. For a detailed description of the survey and its scientific motivations, please see the original proposal to the NRAO skeptical review committee. The VLSS is being made as a service to the astronomical community, and the principal data products are being released to the public as soon as they are produced and verified. Details and access to the images can be found at http://lwa.nrl.navy.mil/VLSS/ (1 data file).

  18. VizieR Online Data Catalog: The VLA Low-frequency Sky Survey at 74MHz (Cohen+ 2007)

    Science.gov (United States)

    Cohen, A. S.; Lane, W. M.; Cotton, W. D.; Kassim, N. E.; Lazio, T. J. W.; Perley, R. A.; Condon, J. J.; Erickson, W. C.

    2006-08-01

    The VLA Low-Frequency Sky Survey (VLSS) is a 74MHz (4m) continuum survey covering the entire sky north of -30{deg} declination. Using the VLA in B- and BnA-configurations, we will map the entire survey region at a resolution of 80" and with an average rms noise of 0.1 Jy/beam. For a detailed description of the survey and its scientific motivations, please see the original proposal to the NRAO skeptical review committee. The VLSS is being made as a service to the astronomical community, and the principal data products are being released to the public as soon as they are produced and verified. Details and access to the images can be found at http://lwa.nrl.navy.mil/VLSS/ (1 data file).

  19. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  20. VLA Observations Of T CrB Reveal Increase in Radio Flux Density Between 2014 and 2016

    Science.gov (United States)

    Linford, J.; Weston, J.; Chomiuk, L.; Sokoloski, J.; Nelson, T.; Mukai, K.; Finzell, T.; Rupen, M.; Mioduszewski, A.

    2016-06-01

    We report new observations of the symbiotic binary and known recurrent nova T Coronae Borealis (T CrB) with the Karl G. Janksy Very Large Array (VLA). We recently began monitoring T CrB in 2016 May after reports that it was in a super-active state at other wavelengths (Munari, Dallaporta, & Cherini 2016, NewA, 47, 7; ATEL #8675; AAVSO Special Notice 415).

  1. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  2. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  3. Upgrade of the Proton West secondary beamline

    International Nuclear Information System (INIS)

    Spiegel, L.

    1989-01-01

    As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p + /π + or p - /π - , were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs

  4. Functional and clinical relevance of VLA-4 (CD49d/CD29) in ibrutinib-treated chronic lymphocytic leukemia

    Science.gov (United States)

    Tissino, Erika; Benedetti, Dania; Herman, Sarah E.M.; ten Hacken, Elisa; Rossi, Francesca Maria; Dal Bo, Michele; Bulian, Pietro; Bomben, Riccardo; Bayer, Elisabeth; Härzschel, Andrea; Gutjahr, Julia Christine; Postorino, Massimiliano; Santinelli, Enrico; Zaja, Francesco; Pozzato, Gabriele; Chigaev, Alexandre; Sklar, Larry A.; Burger, Jan A.; Ferrajoli, Alessandra; Shanafelt, Tait D.; Wiestner, Adrian; Del Poeta, Giovanni; Hartmann, Tanja Nicole

    2018-01-01

    The Bruton’s tyrosine kinase (BTK) inhibitor ibrutinib, which antagonizes B cell receptor (BCR) signals, demonstrates remarkable clinical activity in chronic lymphocytic leukemia (CLL). The lymphocytosis experienced by most patients under ibrutinib has previously been attributed to inhibition of BTK-dependent integrin and chemokine cues operating to retain the tumor cells in nodal compartments. Here, we show that the VLA-4 integrin, as expressed by CD49d-positive CLL, can be inside-out activated upon BCR triggering, thus reinforcing the adhesive capacities of CLL cells. In vitro and in vivo ibrutinib treatment, although reducing the constitutive VLA-4 activation and cell adhesion, can be overcome by exogenous BCR triggering in a BTK-independent manner involving PI3K. Clinically, in three independent ibrutinib-treated CLL cohorts, CD49d expression identifies cases with reduced lymphocytosis and inferior nodal response and behaves as independent predictor of shorter progression-free survival, suggesting the retention of CD49d-expressing CLL cells in tissue sites via activated VLA-4. Evaluation of CD49d expression should be incorporated in the characterization of CLL undergoing therapy with BCR inhibitors. PMID:29301866

  5. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  6. Upgrading nuclear safeguards in Kazakhstan

    International Nuclear Information System (INIS)

    Hunt, Maribeth; Murakami, Kenji

    2005-01-01

    accurately account for the nuclear material received, and to generally upgrade the safety, security, and accountancy standards. While the material that is actually in hold-up may not be of particular concern with respect to nuclear proliferation and nuclear security, a plant's declaration of hold-up may be a way of concealing diversion of nuclear material. Overstating the amount of material in hold-up can allow an operator to divert material. In the past, neither the UMP nor the IAEA has had an accurate estimate of the material designated as hold-up. When the hold-up of a plant can be characterized and verified it assures that this proliferation pathway is protected. During the PIV in September 2004, the Agency used its ISOCS system to re-measure points that had been measured during the PIV in 2003 and to measure points that the operator had measured with the systems provided by the Japanese and the United States. The result was that at the Physical Inventory Taking in 2004, UMP staff were able to make an effective declaration of hold-up and the Agency was able to verify it. At the same time, the rest of the work of the donor States was progressing. The funding from the Japanese government has assured the preparation of three procedures to standardize the nuclear material accountancy and control at the UMP and has sponsored the training of two UMP safeguards officials in Japan. One of the original goals of this integrated project was to significantly reduce, by 2005, the uncertainty in the measurement of hold-up at the UMP. Through the concerted efforts of the IAEA, donor States, and the European Union, this goal was reached in September 2004. Over the next year, work will concentrate on further training of personnel, the Russian translation and distribution of the procedures funded by the Japanese government, coordinating the delivery and installation of equipment from the United States, and UMP staff training in safeguards and safety culture

  7. A summary of the regional upgrader business plan

    International Nuclear Information System (INIS)

    Carpenter, J.S.

    1991-01-01

    The stakeholders with potential interests in an Alberta regional upgrader for bitumen, heavy oil, or refinery residue were identified and a reasonably comprehensive business plan for such an upgrader was created and analyzed. Assuming a plant accepting 30,000 bbl/d of feedstock using known hydrocracking and hydroprocessing technologies, producing a synthetic crude oil of a quality good enough to substitute for Alberta light crude in existing refineries, the risks, financing arrangements, and base case economics were examined. According to reasonable price forecasts and a socio-economic benefit assessment, there are enough benefits in such an upgrader to make its construction attractive in the near term. However, conventional investment economics make it unlikely that such a project could be supported in Alberta's current business environment. Accordingly, the business plan was revised to reduce risks and increase profitability to equity holders. The plant capacity would be doubled, with a major oil company acquiring half the output for its own production at less than half the installed cost. The rest of the plant would be owned by government and by smaller producers who would gain access to the upgrader feedstock capacity. A collar mechanism is offered to reduce bitumen price risks without impairing upgrader economics. A number of niche opportunities are also identified within the regional upgrader concept that would further enhance the return through lower costs. 2 figs., 4 tabs

  8. Upgrading of radon's type near surface repository in Latvia

    International Nuclear Information System (INIS)

    Abramenkovs, A.

    2006-01-01

    In 1959, the Soviet government decided to construct the near surface radioactive wastes repository 'Radons' near the Baldone city. It was put in operation in 1962. The changes in the development of the repository were induced by the necessarily to upgrade it for disposal of radioactive wastes from the decommissioning of the Salaspils Research Reactor (SRR). The safety assessment of repository was performed during 2000-2001 under the PHARE project for necessary upgrades of repository. The outline design for new vaults and interim storage for long lived radioactive wastes was elaborated during 2003-2004 years. The Environmental Impact Assessment (EIA) for upgrade of Baldone repository was performed during 2004-2005 years. It was found, that additional efforts must be devoted for solution of social aspects o for successful operation and upgrade of repository. It was shown by EIA, that the local population has a negative opinion against the upgrade of repository in Latvia. The main recommendations for upgrades were connected with increasing the safety of repository, increasing of PR activities for education of society and developing of compensation mechanism for local municipality. (author)

  9. Altair performance and upgrades

    Science.gov (United States)

    Lai, Olivier; Véran, Jean-Pierre; Herriot, Glen; White, John; Ball, Jesse; Trujillo, Chad

    2014-07-01

    Altair is the facility single conjugate AO system for Gemini North. Although it has been in operation for more than 10 years (and upgraded to LGS in 2007), Altair's performance is degraded by three main issues: vibrations of the telescope and instrument support structure, spatial aliasing on centroid offsets from the M2 support structure print-through on the optical surface and static non-common path aberrations. Monte-Carlo simulations can reproduce the behavior of Altair when including these three effects and they are roughly of the same order of magnitude. Solutions or mitigations are being investigated to overcome these nefarious effects and restore Altair's performance to its nominal level. A simplex algorithm as well as a phase diversity approach are being investigated to measure and correct for static aberrations. A high accuracy phase map of the M2 print-through has been obtained and is being used to calibrate and/or filter centroids affected by aliasing. A new real time computer is under consideration, to be able to handle more advanced controllers, especially notch filters to combat vibrations. In this paper we will report on the various simulations and on-sky results of this rejuvenation of one of Gemini's workhorse instruments.

  10. Alberta propylene upgrading prospects

    International Nuclear Information System (INIS)

    2000-03-01

    A very significant byproduct recovery and purification scheme is at present being prepared by TransCanada Midstream (TCMS). Alberta Economic Development commissioned an independent study to identify propylene supply options while proceeding with the evaluation of various propylene derivatives with regard to their fit with the Alberta context. Identification of chemical companies with derivative interests was also accomplished. By 2005, it is estimated that 280 kilo-tonnes of propylene will be available on an annual basis from byproduct sources. Those sources are oil sands upgraders, ethylene plants and refineries. The ranges of impurities and supply costs vary between the different sources. An option being considered involves pipeline and rail receipt with a major central treating and distillation facility for the production of polymer grade (PG) propylene with propane and other smaller byproducts. Special consideration was given to three chemicals in this study, namely: polypropylene (PP), acrylonitrile (ACN), and acrylic acid (AA). Above average growth rates were identified for these chemicals: demand is growing at 6 to 7 per cent a year for both PP and ACN, while demand for AA grows at 8 per cent annually. Two other possibilities were identified, propylene oxide (PO) and phenol. The study led to the conclusion that low capital and operating costs and shipping costs to the Pacific Rim represent advantages to the development of propylene derivatives in the future in Alberta. 4 refs., 87 tabs., 7 figs

  11. Safety upgrading at PAKS Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bajsz, J.; Elter, J.

    2000-01-01

    The operation of Paks NPP has reached its half time. Until this time the plant fulfilled expectations raised before its construction: the four units have produced safely and reliably more than 200 TWh electricity. The production of the plant has been at the stable level since its construction and has provided 43-38 % of electricity consumed in Hungary. The annual production is around 14 TWh, which means a load factor higher than 85 %. Safety upgrading activities [1] at Paks had started in the late eighties, when the commissioning work of units 3 and 4 were carried out. That time the main emphases were put to lessons learned of the TMI and Chernobyl accidents. The international reviews hosted by our plant widened our review's scope. To systematize our approach a complete safety review, the AGNES (Advanced General Safety and New Evaluation of Safety) project was started in 1991. The goal of the project was to evaluate to what extent Paks NPP satisfied the current international safety expectations and to help in determining the priorities for safety enhancement and upgrading measures. The project completed in 1994 ranked our safety upgrading measures by safety significance, which became a basis for technical design work and financial scheduling. The other important outcome of the AGNES project was the introduction the Periodical Safety Review regime by our nuclear authority. These periodical reviews held after 10 years of operation offer the possibility - and obligation for the licensee - to perform a comprehensive assessment of the safety of the plant, to evaluate the integral effects of changes of circumstances happened during the review period. The goal of these reviews is to deal with cumulative effects of NPP ageing, modifications, operating experience and technical developments aimed at ensuring a high level of safety throughout plant service life. The execution of our safety-upgrading program is well advancing. For the whole program from 1996 to 2002 250

  12. THE VLA NASCENT DISK AND MULTIPLICITY (VANDAM) SURVEY OF PERSEUS PROTOSTARS. RESOLVING THE SUB-ARCSECOND BINARY SYSTEM IN NGC 1333 IRAS2A

    International Nuclear Information System (INIS)

    Tobin, John J.; Looney, Leslie W.; Dunham, Michael M.; Li, Zhi-Yun; Chandler, Claire J.; Perez, Laura M.; Segura-Cox, Dominique; Harris, Robert J.; Hull, Charles L. H.; Sadavoy, Sarah I.; Melis, Carl; Kratter, Kaitlin; Jørgensen, Jes K.; Plunkett, Adele L.

    2015-01-01

    We are conducting a Jansky Very Large Array (VLA) Ka-band (8 mm and 1 cm) and C-band (4 cm and 6.4 cm) survey of all known protostars in the Perseus Molecular Cloud, providing resolution down to ∼0.''06 and ∼0.''35 in the Ka band and C band, respectively. Here we present first results from this survey that enable us to examine the source NGC 1333 IRAS2A in unprecedented detail and resolve it into a protobinary system separated by 0.''621 ± 0.''006 (∼143 AU) at 8 mm, 1 cm, and 4 cm. These two sources (IRAS2A VLA1 and VLA2) are likely driving the two orthogonal outflows known to originate from IRAS2A. The brighter source IRAS2A VLA1 is extended perpendicular to its outflow in the VLA data, with a deconvolved size of 0.''055 (∼13 AU), possibly tracing a protostellar disk. The recently reported candidate companions (IRAS2A MM2 and MM3) are not detected in either our VLA data, Combined Array for Research in Millimeter-wave Astronomy (CARMA) 1.3 mm data, or Submillimeter Array (SMA) 850 μm data. SMA CO (J = 3 → 2), CARMA CO (J = 2 → 1), and lower-resolution CARMA CO (J = 1 → 0) observations are used to examine the outflow origins and the nature of the candidate companions to IRAS2A VLA1. The CO (J = 3 → 2) and (J = 2 → 1) data show that IRAS2A MM2 is coincident with a bright CO emission spot in the east-west outflow, and IRAS2A MM3 is within the north-south outflow. In contrast, IRAS2A VLA2 lies at the east-west outflow symmetry point. We propose that IRAS2A VLA2 is the driving source of the east-west outflow and a true companion to IRAS2A VLA1, whereas IRAS2A MM2 and MM3 may not be protostellar

  13. THE VLA NASCENT DISK AND MULTIPLICITY (VANDAM) SURVEY OF PERSEUS PROTOSTARS. RESOLVING THE SUB-ARCSECOND BINARY SYSTEM IN NGC 1333 IRAS2A

    Energy Technology Data Exchange (ETDEWEB)

    Tobin, John J.; Looney, Leslie W. [National Radio Astronomy Observatory, Charlottesville, VA 22903 (United States); Dunham, Michael M. [Harvard-Smithsonian Center for Astrophysics, Cambridge, MA 02138 (United States); Li, Zhi-Yun [Department of Astronomy, University of Virginia, Charlottesville, VA 22903 (United States); Chandler, Claire J.; Perez, Laura M. [National Radio Astronomy Observatory, Socorro, NM 87801 (United States); Segura-Cox, Dominique; Harris, Robert J.; Hull, Charles L. H. [Department of Astronomy, University of Illinois, Urbana, IL 61801 (United States); Sadavoy, Sarah I. [Max-Planck-Institut für Astronomie, D-69117 Heidelberg (Germany); Melis, Carl [Center for Astrophysics and Space Sciences, University of California, San Diego, CA 92093 (United States); Kratter, Kaitlin [Steward Observatory, University of Arizona, Tucson, AZ 85721 (United States); Jørgensen, Jes K. [Niels Bohr Institute, University of Copenhagen, Juliane Maries Vej 30, DK-2100 Copenhagen Ø. (Denmark); Plunkett, Adele L., E-mail: jtobin@nrao.edu, E-mail: jeskj@nbi.dk [Department of Astronomy, Yale University, New Haven, CT 06520 (United States)

    2015-01-01

    We are conducting a Jansky Very Large Array (VLA) Ka-band (8 mm and 1 cm) and C-band (4 cm and 6.4 cm) survey of all known protostars in the Perseus Molecular Cloud, providing resolution down to ∼0.''06 and ∼0.''35 in the Ka band and C band, respectively. Here we present first results from this survey that enable us to examine the source NGC 1333 IRAS2A in unprecedented detail and resolve it into a protobinary system separated by 0.''621 ± 0.''006 (∼143 AU) at 8 mm, 1 cm, and 4 cm. These two sources (IRAS2A VLA1 and VLA2) are likely driving the two orthogonal outflows known to originate from IRAS2A. The brighter source IRAS2A VLA1 is extended perpendicular to its outflow in the VLA data, with a deconvolved size of 0.''055 (∼13 AU), possibly tracing a protostellar disk. The recently reported candidate companions (IRAS2A MM2 and MM3) are not detected in either our VLA data, Combined Array for Research in Millimeter-wave Astronomy (CARMA) 1.3 mm data, or Submillimeter Array (SMA) 850 μm data. SMA CO (J = 3 → 2), CARMA CO (J = 2 → 1), and lower-resolution CARMA CO (J = 1 → 0) observations are used to examine the outflow origins and the nature of the candidate companions to IRAS2A VLA1. The CO (J = 3 → 2) and (J = 2 → 1) data show that IRAS2A MM2 is coincident with a bright CO emission spot in the east-west outflow, and IRAS2A MM3 is within the north-south outflow. In contrast, IRAS2A VLA2 lies at the east-west outflow symmetry point. We propose that IRAS2A VLA2 is the driving source of the east-west outflow and a true companion to IRAS2A VLA1, whereas IRAS2A MM2 and MM3 may not be protostellar.

  14. Tracing the Baryon Cycle within Nearby Galaxies with a next-generation VLA

    Science.gov (United States)

    Kepley, Amanda A.; Leroy, Adam; Murphy, Eric J.; ngVLA Baryon Cycle Science Working Group

    2017-01-01

    The evolution of galaxies over cosmic time is shaped by the cycling of baryons through these systems, namely the inflow of atomic gas, the formation of molecular structures, the birth of stars, and the expulsion of gas due to associated feedback processes. The best way to study this cycle in detail are observations of nearby galaxies. These systems provide a complete picture of baryon cycling over a wide range of astrophysical conditions. In the next decade, higher resolution/sensitivity observations of such galaxies will fundamentally improve our knowledge of galaxy formation and evolution, allowing us to better interpret higher redshift observations of sources that were rapidly evolving at epochs soon after the Big Bang. In particular, the centimeter-to-millimeter part of the spectrum provides critical diagnostics for each of the key baryon cycling processes and access to almost all phases of gas in galaxies: cool and cold gas (via emission and absorption lines), ionized gas (via free-free continuum and recombination lines), cosmic rays and hot gas (via synchrotron emission and the Sunyaev-Zeldovich effect). This poster highlights a number of key science problems in this area whose solutions require a next-generation radio-mm interferometer such as the next-generation VLA.

  15. VLA Observations of the Disk around the Young Brown Dwarf 2MASS J044427+2512

    Energy Technology Data Exchange (ETDEWEB)

    Ricci, L. [Department of Physics and Astronomy, Rice University, 6100 Main Street, Houston, TX 77005 (United States); Rome, H. [The Kinkaid School, 201 Kinkaid School Drive, Houston, TX 77024 (United States); Pinilla, P. [Department of Astronomy Steward Observatory, The University of Arizona, 933 North Cherry Avenue, Tucson, AZ 85721 (United States); Facchini, S. [Max-Planck-Institut fur Extraterrestrische Physik, Giessenbachstrasse 1, D-85748 Garching (Germany); Birnstiel, T. [University Observatory, Faculty of Physics, Ludwig-Maximilians-Universität München, Scheinerstr. 1, D-81679 Munich (Germany); Testi, L., E-mail: luca.ricci@rice.edu [European Southern Observatory (ESO) Headquarters, Karl-Schwarzschild-Str. 2, D-85748 Garching (Germany)

    2017-09-01

    We present multi-wavelength radio observations obtained with the VLA of the protoplanetary disk surrounding the young brown dwarf 2MASS J04442713+2512164 (2M0444) in the Taurus star-forming region. 2M0444 is the brightest known brown dwarf disk at millimeter wavelengths, making this an ideal target to probe radio emission from a young brown dwarf. Thermal emission from dust in the disk is detected at 6.8 and 9.1 mm, whereas the 1.36 cm measured flux is dominated by ionized gas emission. We combine these data with previous observations at shorter sub-mm and mm wavelengths to test the predictions of dust evolution models in gas-rich disks after adapting their parameters to the case of 2M0444. These models show that the radial drift mechanism affecting solids in a gaseous environment has to be either completely made inefficient, or significantly slowed down by very strong gas pressure bumps in order to explain the presence of mm/cm-sized grains in the outer regions of the 2M0444 disk. We also discuss the possible mechanisms for the origin of the ionized gas emission detected at 1.36 cm. The inferred radio luminosity for this emission is in line with the relation between radio and bolometric luminosity valid for for more massive and luminous young stellar objects, and extrapolated down to the very low luminosity of the 2M0444 brown dwarf.

  16. VLA radio-continuum survey of a sample of confirmed and marginal barium stars

    International Nuclear Information System (INIS)

    Drake, S.A.; Simon, T.; Linsky, J.L.

    1987-01-01

    Results are reported from a 6-cm VLA survey of five confirmed Ba II stars and eight mild Ba II stars, undertaken to search for evidence of gyrosynchrotron emission or thermal emission from the primary star's wind that is enhanced or photoionized by a white dwarf companion. Of these 13 stars, only Beta UMi was detected as a possible radio source at a flux level of 0.11 mJy (3sigma). The 6-cm radio luminosities (L6) of the other stars are as small as log L6 less than or equal to 14.0 and are an order of magnitude or more lower than the average levels found in RS CVn systems, but are consistent with the L6 upper limits previously found for stars of spectral type similar to the Ba II stars and normal elemental abundances. The upper limit to the radio luminosity for the possible mild Ba II star 56 Peg, when combined with its previously known X-ray luminosity, may provide useful constraints on the various models that have been proposed for this interesting object, once its orbital period is known. 28 references

  17. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  18. Mining Upgrades to Reduce Pollution

    Science.gov (United States)

    Settlement with Southern Coal Corporation and 26 affiliates requires the companies to comprehensively upgrade their coal mining and processing operations to prevent polluted wastewater from threatening rivers and streams and communities across Appalachia.

  19. Silicon Tracking Upgrade at CDF

    International Nuclear Information System (INIS)

    Kruse, M.C.

    1998-04-01

    The Collider Detector at Fermilab (CDF) is scheduled to begin recording data from Run II of the Fermilab Tevatron in early 2000. The silicon tracking upgrade constitutes both the upgrade to the CDF silicon vertex detector (SVX II) and the new Intermediate Silicon Layers (ISL) located at radii just beyond the SVX II. Here we review the design and prototyping of all aspects of these detectors including mechanical design, data acquisition, and a trigger based on silicon tracking

  20. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  1. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  2. Preliminary studies for the upgrading of the ININ TRIGA MARK III reactor

    International Nuclear Information System (INIS)

    Aguilar, J.V.

    1984-01-01

    An increase on the demand of services has led to the -consideration of reactor upgrading, for which a project has been proposed. This project includes the modification of the reactor core, using FLIP type (Erbium loaded, 70% U-235 enriched) fuel elements and the upgrading of the control - console which implies a careful analysis of the Safety -considerations involved in the system modification. In this paper, a brief description is given of: The modifications intended; Pre-operational tests for the system components to be modified; The safety report needed for the licensing of the upgraded reactor; The project management and evaluation

  3. Upgrading inflatable door seals

    International Nuclear Information System (INIS)

    Sykes, T.M.; Metcalfe, R.; Welch, L.A.; Josefowich, J.M.

    1997-01-01

    Inflatable door seals are used for airlocks in CANDU stations. They have been a significant source of unreliability and maintenance cost. A program is underway to improve their performance and reliability, backed by environmental qualification testing. Only commercial products and suppliers existed in 1993. For historical reasons, these 'existing products' did not use the most durable material then available. In hindsight, neither had they been adapted nor optimized to combat conditions often experienced in the plants-sagging doors, damaged sealing surfaces, and many thousands of openings and closings per year. Initial attempts to involve the two existing suppliers in efforts to upgrade these seals were unsuccessful. Another suitable supplier had therefore to be found, and a 'new,' COG-owned seal developed; this was completed in 1997. This paper summarizes its testing, along with that of the two existing products. Resistance to aging has been improved significantly. Testing has shown that an accident can be safely withstood after 10 years of service or 40,000 openings-closings, whichever comes first. AECL's Fluid Sealing Technology Unit (FSTU) has invested in the special moulds, test fixtures and other necessary tooling and documentation required to begin commercial manufacture of this new quality product. Accordingly, as with FSTU's other nuclear products such as pump seals, the long-term supply of door seals to CANDU plants is now protected from many external uncertainties-e.g., commercial products being discontinued, materials being changed, companies going out of business. Manufacturing to AECL's detailed specifications is being subcontracted to the new supplier. FSTU is performing the quality surveillance, inspection, testing, and customer service activities concomitant with direct responsibility for supply to the plants. (author)

  4. IPNS upgrade: A feasibility study

    International Nuclear Information System (INIS)

    1995-04-01

    Many of Argonne National Laboratory's (ANL's) scientific staff members were very active in R ampersand D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R ampersand D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL's Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately

  5. IPNS upgrade: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  6. A case study of intelligent compaction used in road upgrades

    CSIR Research Space (South Africa)

    Leyland, R

    2014-08-01

    Full Text Available to traditional testing methods. In a field study numerous different IC systems where used during construction of a number of experimental road sections in South Africa. These sections formed part of a road upgrade project typical of most road construction...

  7. Urban upgrading for violence prevention in South Africa: Does it ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Violence Prevention through Urban Upgrading (VPUU) project, funded jointly by the German Development Bank and the City of Cape Town in South Africa, is a prime example of an evidence-based intervention for violence prevention that was designed to address all urban violence determining factors. The VPUU ...

  8. Participatory slum upgrading as a disjunctive process in Recife, Brazil

    NARCIS (Netherlands)

    Vries, de Pieter

    2016-01-01

    This article engages with the coproduction of urban space by focusing on a slum upgrading project in Recife, Brazil. It argues that the urban situation is essentially inconsistent, unpredictable and unstable. It documents the history of urban planning in Recife, paying special attention to the

  9. Linac upgrade plan for the KEK B-Factory

    International Nuclear Information System (INIS)

    Enomoto, Atsushi; Anami, Shozo; Kamitani, Takuya; Hanaki, Hirofumi; Shidara, Tetsuo; Sato, Isamu

    1993-01-01

    In the KEK B-Factory plan, e+/e- collider rings with 3.5- GeV positions and 8-GeV electrons are being considered, and full-energy injection from the existing linac is required. The acceleration energy of the linac must be upgraded from 2.5 to 8 GeV. The most effective way has been searched from several points of view, such as the beam quality, ease of beam handling, and construction. This article describes the basic plan of the energy upgrade and recent progress regarding this project

  10. Upgrades for Offline Data Quality Monitoring at ATLAS

    CERN Document Server

    Joergensen, M D; The ATLAS collaboration; Frost, J

    2013-01-01

    The ATLAS offline data quality monitoring infrastructure functioned successfully during the 2010-2012 run of the LHC. During the 2013-14 long shutdown, a large number of upgrades will be made in response to user needs and to take advantage of new technologies - for example, deploying richer web applications, improving dynamic visualization of data, streamlining configuration, and moving applications to a common messaging bus. Additionally consolidation and integration activities will occur. We will discuss lessons learned so far and the progress of the upgrade project, as well as associated improvements to the data reconstruction and processing chain.

  11. SLHC, the high-luminosity upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2009-01-01

    In the morning of February 26th a public event is organised in CERN's main auditorium with the aim of informing the particle physics community about the current status of preparation work for the future LHC luminosity upgrade (Phase 1 and Phase 2). The presentations will provide an overview of the various accelerator sub-projects, the physics potential and the experiment upgrade plans. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the SLHC project. Informing the public about the overall status of SLHC is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  12. UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3

    International Nuclear Information System (INIS)

    Revankar, S. T.

    2004-01-01

    The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004

  13. Upgrade and extension of the climate station at DTU Byg

    DEFF Research Database (Denmark)

    Andersen, Elsa; Dragsted, Janne; Kristensen, Troels V.

    In the period 2013-2014 the projectUpgrade and Extension of the Climate Station at DTU Byg” is carried out at DTU Byg. The aim of the project is to renew the hardware and the software for data acquisition and monitoring, exchange cables and cable connections in order to avoid interference...... of electrical noise from the surroundings and exchange worn out equipment. Further, the aim is to make measured data from the climate station easily available for the users....

  14. FRIGG '95. ABB Atom's upgraded T/H loop

    International Nuclear Information System (INIS)

    Noren, T.

    1995-01-01

    The FRIGG '95 project is an upgrading and modernization of the FRIGG loop, ABB Atom's fuel test rig with BWR operating conditions. The current FRIGG loop with test section and heater rods is described, together with the modifications involved in the FRIGG '95 project, including the new unique tomographic void measuring system to be installed. Finally CFD (Computational Fluid Dynamics) is introduced. (orig) (8 refs., 10 figs.)

  15. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  16. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  17. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  18. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  19. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  20. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  1. The Upgraded DØ detector

    Czech Academy of Sciences Publication Activity Database

    Abazov, V. M.; Abbott, B.; Abolins, M.; Kupčo, Alexander; Lokajíček, Miloš; Šimák, Vladislav

    2006-01-01

    Roč. 565, - (2006), s. 463-537 ISSN 0168-9002 R&D Projects: GA MŠk 1P04LA210; GA MŠk 1P05LA257 Institutional research plan: CEZ:AV0Z10100502 Keywords : Fermilab * DZero * DØ * detector Subject RIV: BF - Elementary Particles and High Energy Physics Impact factor: 1.185, year: 2006

  2. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  3. Upgrading the BEPC control system

    International Nuclear Information System (INIS)

    Yang Liping; Wang Lizheng; Liu Shiyao

    1992-01-01

    The BEPC control system has been put into operation and operated normally since the end of 1987. Three years's experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages araised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc.. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DEC net and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance. (author)

  4. Reflections on a digital upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tadjalli, M.

    2013-07-01

    Upon receiving US NRC's approval in 2010, the first RPS/ESPS digital upgrade using TELEPERM® XS technology was successfully installed in Spring of 2011 at the first Unit of a three-unit station, followed by the 2nd Unit installation in spring of 2012. Both Units' systems have been operating flawlessly since installation. After about two years of operation, a reflection on digital upgrades and lessons learned, from a vendor perspective, provides valuable insight for the commercial nuclear power industry.

  5. Kansas State University accelerator laboratory upgrade

    International Nuclear Information System (INIS)

    Richard, P.

    1989-01-01

    The J.R. Macdonald Laboratory is undergoing a major upgrade of its facilities and capabilities. The laboratory is dedicated to the study of ion-atom collisions using highly charged ions from accelerators and/or ion sources. The mainstay of the laboratory over the last two decades has been a 6 MV tandem accelerator. It has been used to produce one- to a few-MeV/u highly charged ions for studying high energy atomic collisions, and to produce recoil ions from ocllisions with projectile ions for studying low energy atomic collisions. In order to enhance the capabilities of studying atomic collisions in these two energy regimes, we are constructing a superconducting LINAC booster to the tandem, and a stand-alone CRYEBIS source. The project, which is funded by the US Department of Energy, began in May 1985 with a May 1989 completion schedule. The upgrade includes a building addition, funded by the State of Kansas, to house the new facilities. The LINAC consists of a time-superbunching module, followed by three large cryostat modules each containing four superconducting resonators, and followed by an energy-rebunching module. The resonators are the split-ring superconducting Nb type designed and constructed at Argonne National Laboratory, and are presently being tested at KSU. The CRYEBIS source, which consists of a 1 m long 5 T superconducting solenoid with a high degree of straightness, is in the final stages of assembly. We have in operation a new computer network for data acquisition and analysis. A progress report on the status of the upgrade is presented. (orig.)

  6. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  7. Tumor necrosis factor-α enhanced fusions between oral squamous cell carcinoma cells and endothelial cells via VCAM-1/VLA-4 pathway

    International Nuclear Information System (INIS)

    Song, Kai; Zhu, Fei; Zhang, Han-zhong; Shang, Zheng-jun

    2012-01-01

    Fusion between cancer cells and host cells, including endothelial cells, may strongly modulate the biological behavior of tumors. However, no one is sure about the driving factors and underlying mechanism involved in such fusion. We hypothesized in this study that inflammation, one of the main characteristics in tumor microenvironment, serves as a prominent catalyst for fusion events. Our results showed that oral cancer cells can fuse spontaneously with endothelial cells in co-culture and inflammatory cytokine tumor necrosis factor-α (TNF-α) increased fusion of human umbilical vein endothelium cells and oral cancer cells by up to 3-fold in vitro. Additionally, human oral squamous cell carcinoma cell lines and 35 out of 50 (70%) oral squamous carcinoma specimens express VLA-4, an integrin, previously implicated in fusions between human peripheral blood CD34-positive cells and murine cardiomyocytes. Expression of VCAM-1, a ligand for VLA-4, was evident on vascular endothelium of oral squamous cell carcinoma. Moreover, immunocytochemistry and flow cytometry analysis revealed that expression of VCAM-1 increased obviously in TNF-α-stimulated endothelial cells. Anti-VLA-4 or anti-VCAM-1 treatment can decrease significantly cancer–endothelial adhesion and block such fusion. Collectively, our results suggested that TNF-α could enhance cancer–endothelial cell adhesion and fusion through VCAM-1/VLA-4 pathway. This study provides insights into regulatory mechanism of cancer–endothelial cell fusion, and has important implications for the development of novel therapeutic strategies for prevention of metastasis. -- Highlights: ► Spontaneous oral cancer–endothelial cell fusion. ► TNF-α enhanced cell fusions. ► VCAM-1/VLA-4 expressed in oral cancer. ► TNF-α increased expression of VCAM-1 on endothelial cells. ► VCAM-1/VLA-4 mediated TNF-α-enhanced cell fusions.

  8. Tumor necrosis factor-{alpha} enhanced fusions between oral squamous cell carcinoma cells and endothelial cells via VCAM-1/VLA-4 pathway

    Energy Technology Data Exchange (ETDEWEB)

    Song, Kai; Zhu, Fei; Zhang, Han-zhong [The State Key Laboratory Breeding Base of Basic Science of Stomatology (Hubei-MOST), Key Laboratory for Oral Biomedicine Ministry of Education, Wuhan University, Wuhan (China); Shang, Zheng-jun, E-mail: shangzhengjun@hotmail.com [The State Key Laboratory Breeding Base of Basic Science of Stomatology (Hubei-MOST), Key Laboratory for Oral Biomedicine Ministry of Education, Wuhan University, Wuhan (China); First Department of Oral and Maxillofacial Surgery, School and Hospital of Stomatology, Wuhan University, Wuhan (China)

    2012-08-15

    Fusion between cancer cells and host cells, including endothelial cells, may strongly modulate the biological behavior of tumors. However, no one is sure about the driving factors and underlying mechanism involved in such fusion. We hypothesized in this study that inflammation, one of the main characteristics in tumor microenvironment, serves as a prominent catalyst for fusion events. Our results showed that oral cancer cells can fuse spontaneously with endothelial cells in co-culture and inflammatory cytokine tumor necrosis factor-{alpha} (TNF-{alpha}) increased fusion of human umbilical vein endothelium cells and oral cancer cells by up to 3-fold in vitro. Additionally, human oral squamous cell carcinoma cell lines and 35 out of 50 (70%) oral squamous carcinoma specimens express VLA-4, an integrin, previously implicated in fusions between human peripheral blood CD34-positive cells and murine cardiomyocytes. Expression of VCAM-1, a ligand for VLA-4, was evident on vascular endothelium of oral squamous cell carcinoma. Moreover, immunocytochemistry and flow cytometry analysis revealed that expression of VCAM-1 increased obviously in TNF-{alpha}-stimulated endothelial cells. Anti-VLA-4 or anti-VCAM-1 treatment can decrease significantly cancer-endothelial adhesion and block such fusion. Collectively, our results suggested that TNF-{alpha} could enhance cancer-endothelial cell adhesion and fusion through VCAM-1/VLA-4 pathway. This study provides insights into regulatory mechanism of cancer-endothelial cell fusion, and has important implications for the development of novel therapeutic strategies for prevention of metastasis. -- Highlights: Black-Right-Pointing-Pointer Spontaneous oral cancer-endothelial cell fusion. Black-Right-Pointing-Pointer TNF-{alpha} enhanced cell fusions. Black-Right-Pointing-Pointer VCAM-1/VLA-4 expressed in oral cancer. Black-Right-Pointing-Pointer TNF-{alpha} increased expression of VCAM-1 on endothelial cells. Black

  9. Old PCs: Upgrade or Abandon?

    Science.gov (United States)

    Perez, Ernest

    1997-01-01

    Examines the practical realities of upgrading Intel personal computers in libraries, considering budgets and technical personnel availability. Highlights include adding RAM; putting in faster processor chips, including clock multipliers; new hard disks; CD-ROM speed; motherboards and interface cards; cost limits and economic factors; and…

  10. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron

  11. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availa...

  12. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron r...

  13. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Angioni, C.; Atanasiu, C. V.; Balden, M.; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Bobkov, V.; Boom, J.; Bottino, A.; Braun, F.; Brudgam, M.; Buhler, A.; Burckhart, A.; Chankin, A.; Classen, I.G.J.; Conway, G. D.; Coster, D. P.; de Marne, P.; D' Inca, R.; Drube, R.; Dux, R.; Eich, T.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fahrbach, H. U.; Fattorini, L.; Fischer, R.; Flaws, A.; Funfgelder, H.; Fuchs, J. C.; Gal, K.; Munoz, M. G.; Geiger, B.; Adamov, M. G.; Giannone, L.; Giroud, C.; Gorler, T.; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Gunter, S.; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; Hauff, T.; Heinemann, B.; Herrmann, A.; Hicks, N.; Hobirk, J.; Hohnle, H.; Holzl, M.; Hopf, C.; Horton, L.; Huart, M.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kasemann, C. P.; Kalvin, S.; Kardaun, O.; Kaufmann, M.; Kirk, A.; Klingshirn, H. J.; Kocan, M.; Kocsis, G.; Kollotzek, H.; Konz, C.; Koslowski, R.; Krieger, K.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Leipold, F.; Leuterer, F.; Lohs, A.; N C Luhmann Jr.,; Lunt, T.; Lyssoivan, A.; Maier, H.; Maggi, C.; Mank, K.; Manso, M. E.; Maraschek, M.; Martin, P.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Muller, H. W.; Munich, M.; Murmann, H.; Neu, G.; Neu, R.; Nold, B.; Noterdaeme, J. M.; Park, H. K.; Pautasso, G.; Pereverzev, G.; Podoba, Y.; Pompon, F.; Poli, E.; Polochiy, K.; Potzel, S.; Prechtl, M.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reiter, B.; Ribeiro, T.; Riedl, R.; Rohde, V.; Roth, J.; Rott, M.; Ryter, F.; Sandmann, W.; Santos, J.; Sassenberg, K.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schramm, G.; Schrittwieser, R.; Schweinzer, J.; Scott, B.; Sempf, M.; Serra, F.; Sertoli, M.; Siccinio, M.; Sigalov, A.; Silva, A.; Sips, A.C.C.; Sommer, F.; Stabler, A.; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Szepesi, T.; Tardini, G.; Tichmann, C.; Told, D.; Treutterer, W.; Urso, L.; Varela, P.; Vincente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Vorpahl, C.; Wagner, D.; Weller, A.; Wenninger, R.; Wieland, B.; Wigger, C.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; Wursching, E.; Yadikin, D.; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the

  14. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  15. Upgrading of the Budapest reactor

    International Nuclear Information System (INIS)

    Rosta, L.

    1986-10-01

    The increasing importance of neutron sources, high demand for irradiation and experimental facilities as well as improved safety requirements in the 'eighties, necessitate not only a technical modernization of the Reactor but an overall upgrade including instrumentation. Such a reconstruction was decided by the Hungarian governement in 1983

  16. Upgrading of the West Area

    CERN Multimedia

    1983-01-01

    The rejigged main hall (EHW1) in the West Area: on background, below the crane, is the brown yoke of the Omega magnet which had been resited. The upgrading was completed by the time in July when 400 GeV protons arrived. See Annual Report 1983 p. 107.

  17. LHC challenges and upgrade options

    Energy Technology Data Exchange (ETDEWEB)

    Bruning, O [CERN AB/ABP, Y03600, 1211 Geneva 23 (Switzerland)], E-mail: Oliver.Bruning@cern.ch

    2008-05-15

    The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

  18. LHC challenges and upgrade options

    International Nuclear Information System (INIS)

    Bruning, O

    2008-01-01

    The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex

  19. Five-Megajoule Homopolar Upgrade

    Science.gov (United States)

    1981-06-01

    near the bearing lands to monitor temperature rise during motoring. AISI 4140 steel sleeves were shrunk onto the beryllium copper shaft of the new...MJ HPG in this upgrade. Rotor and Shaft A 0.75-m diameter, 0.28-m thick AISI 4340 air- craft quality steel rotor is shrunk on to a 0. 14-m diameter

  20. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Aguiam, D.; Aho-Mantila, L.

    2017-01-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were design...

  1. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  2. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  3. VVER 1000-NPP Temelin safety upgrading

    International Nuclear Information System (INIS)

    Fleischhans, J.; Ubra, O.

    1995-01-01

    A modernisation program upgrading Temelin plant to meet internationally adopted standard has been implemented during plant design and construction phases. The initial Czech-Russian design (primary system was of Russian design, secondary system was of Czech design) has been extensively modified and adapted to present western safety criteria and operational requirements. The goals are to achieve a high level of safety, reliability, availability and load-following ability. The load-following ability and response to grid frequency changes are very important for the Czech Republic, since the nuclear capacity represents a high proportion of the overall electrical system there. On the basis of IAEA OSART missions and Halliburton NUS audit results and in compliance with recommendations of The State Office for Nuclear Safety, Czech Power Company and Czech scientists and researchers a modernisation program project for Temelin has been carried out. It includes three main groups of VVER1000 MW unit innovations: - Modernization and upgrading of the safety and control systems. - Fuel replacement and modification of the reactor core. - Innovation of some components of the primary and secondary systems. The tenders for instrumentation and control system, nuclear fuel, diagnostic system and radiation monitoring system were issued to the world-well known suppliers. The US company Westinghouse Electric >Corporation (WEC) was selected to submit contract for the delivery of instrumentation and control system primary side diagnostic system and for the delivery of nuclear fuel. The contract was signed in 1993

  4. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  5. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  6. Vermont Yankee simulator BOP model upgrade

    International Nuclear Information System (INIS)

    Alejandro, R.; Udbinac, M.J.

    2006-01-01

    The Vermont Yankee simulator has undergone significant changes in the 20 years since the original order was placed. After the move from the original Unix to MS Windows environment, and upgrade to the latest version of SimPort, now called MASTER, the platform was set for an overhaul and replacement of major plant system models. Over a period of a few months, the VY simulator team, in partnership with WSC engineers, replaced outdated legacy models of the main steam, condenser, condensate, circulating water, feedwater and feedwater heaters, and main turbine and auxiliaries. The timing was ideal, as the plant was undergoing a power up-rate, so the opportunity was taken to replace the legacy models with industry-leading, true on-line object oriented graphical models. Due to the efficiency of design and ease of use of the MASTER tools, VY staff performed the majority of the modeling work themselves with great success, with only occasional assistance from WSC, in a relatively short time-period, despite having to maintain all of their 'regular' simulator maintenance responsibilities. This paper will provide a more detailed view of the VY simulator, including how it is used and how it has benefited from the enhancements and upgrades implemented during the project. (author)

  7. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  8. LLL hydrodiagnostics upgrade program

    International Nuclear Information System (INIS)

    Carpluk, G.T.; Innes, T.G.; Trost, S.R.

    1978-01-01

    The continued success of the nuclear weapon design and test programs is a direct result of the effective hydrodynamic programs developed at Livermore. Hydrodynamic studies provide the weapon designer with experimental verification and analysis of weapon designs through the use of explosively driven, nonfissile materials. Hydrodiagnostic techniques include (1) flash radiography; (2) high-speed photography; (3) electrical-pin diagnostics; and (4) interferometry. The focus of all hydrodynamic testing at LLL is the Site 300 Explosive Test Area located 18 miles east of Livermore. This remote, 10-mi 2 facility consists of: (1) areas for machining and assembling explosives; (2) environmental test facilities; (3) administrative and support facilities; and (4) five underground, reinforced-concrete bunkers equipped with high-speed cameras, electrical data-acquisition systems, and electron accelerators for flash radiography. The report summarizes the improvements made in radiography, optics, electronics, and interferometry, and indicates the projects that remain to be completed

  9. ngVLA Key Science Goal 3: Charting the Assembly, Structure, and Evolution of Galaxies Over Cosmic Time

    Science.gov (United States)

    Riechers, Dominik A.; Bolatto, Alberto D.; Carilli, Chris; Casey, Caitlin M.; Decarli, Roberto; Murphy, Eric Joseph; Narayanan, Desika; Walter, Fabian; ngVLA Galaxy Assembly through Cosmic Time Science Working Group, ngVLA Galaxy Ecosystems Science Working Group

    2018-01-01

    The Next Generation Very Large Array (ngVLA) will fundamentally advance our understanding of the formation processes that lead to the assembly of galaxies throughout cosmic history. The combination of large bandwidth with unprecedented sensitivity to the critical low-level CO lines over virtually the entire redshift range will open up the opportunity to conduct large-scale, deep cold molecular gas surveys, mapping the fuel for star formation in galaxies over substantial cosmic volumes. Imaging of the sub-kiloparsec scale distribution and kinematic structure of molecular gas in both normal main-sequence galaxies and large starbursts back to early cosmic epochs will reveal the physical processes responsible for star formation and black hole growth in galaxies over a broad range in redshifts. In the nearby universe, the ngVLA has the capability to survey the structure of the cold, star-forming interstellar medium at parsec-resolution out to the Virgo cluster. A range of molecular tracers will be accessible to map the motion, distribution, and physical and chemical state of the gas as it flows in from the outer disk, assembles into clouds, and experiences feedback due to star formation or accretion into central super-massive black holes. These investigations will crucially complement studies of the star formation and stellar mass histories with the Large UV/Optical/Infrared Surveyor and the Origins Space Telescope, providing the means to obtain a comprehensive picture of galaxy evolution through cosmic times.

  10. ngVLA Key Science Goal 2: Probing the Initial Conditions for Planetary Systems and Life with Astrochemistry

    Science.gov (United States)

    McGuire, Brett; ngVLA Science Working Group 1

    2018-01-01

    One of the most challenging aspects in understanding the origin and evolution of planets and planetary systems is tracing the influence of chemistry on the physical evolution of a system from a molecular cloud to a solar system. Existing facilities have already shown the stunning degree of molecular complexity present in these systems. The unique combination of sensitivity and spatial resolution offered by the ngVLA will permit the observation of both highly complex and very low-abundance chemical species that are exquisitely sensitive to the physical conditions and evolutionary history of their sources, which are out of reach of current observatories. In turn, by understanding the chemical evolution of these complex molecules, unprecedentedly detailed astrophysical insight can be gleaned from these astrochemical observations.This poster will overview a number of key science goals in astrochemistry which will be enabled by the ngVLA, including:1) imaging of the deepest, densest regions in protoplanetary disks and unveiling the physical history through isotopic ratios2) probing the ammonia snow line in these disks, thought to be the only viable tracer of the water snowline3) observations of the molecular content of giant planet atmospheres4) detections of new, complex molecules, potentially including the simplest amino acids and sugars5) tracing the origin of chiral excess in star-forming regions

  11. ACAB software upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Sanz, J.; Balmisa, J.M.

    1997-10-01

    This report address two issues, namely the ``Selection of the most current nuclear data libraries available`` and the ``User`s manual of the updated ACAB code``. A general summary of the major features of ACAB is provides in Section 1 which highlights the new capabilities included in the present version of ACAB. We address the issue of the nuclear data libraries selected as starting point in preparing the libraries to be used directly by ACAB. Section II describes the main features of the selected libraries. In Section IV, the impact of using these libraries in Inertial Fusion Energy, IFE, applications is assessed by comparing activation results obtained using different activation cross-sections data libraries. The points considered are the processing of libraries and libraries adapted to be directly read by ACAB. The ``processing`` efforts made within the frame of this project have been focused on the COLLAPSE code. Important modifications have been made, and in Section IV we provide an overall description of the new version. The content of the data bases employed by the updated ACAB code are described in Section V. The input data file for running ACAB is dealt with in Section VI, and some example problems are discussed in Section VII. Finally, regarding analysis of activation results we described in Section VIII the updated version of the CHAINS code.

  12. Plans and status of the LHCb upgrade

    CERN Document Server

    Szumlak, Tomasz

    2017-01-01

    LHCb (Large Hadron Collider beauty) is a high precision experiment dedicated to searching for New Physics beyond the Standard Model in the heavy flavour sector. Since LHCb is optimised to perf orm indirect studies and is sensitive to mass scales potentially larger than the LHC energy it is playing a key role in broad searches for New Physics phenomena. This expectation is supported by many intriguing anomalies, especially related to rare decays and lepton flavour universality, observed and reported by LHCb. Thus, it is essential for LHCb to enter the high luminosity phase and continue data taking beyond LHC Long Shutdown 2 (LS2). The LHCb experimental setup will undergo a major upgrade that is be ing planned for the LHC Run 3. Here we will discuss selected aspects of this project.

  13. Renewable Energy in Rural Southeastern Arizona: Decision Factors: A Comparison of the Consumer Profiles of Homeowners Who Purchased Renewable Energy Systems With Those Who Performed Other Home Upgrades or Remodeling Projects

    Science.gov (United States)

    Porter, Wayne Eliot

    Arizona has an abundant solar resource and technologically mature systems are available to capture it, but solar energy systems are still considered to be an innovative technology. Adoption rates for solar and wind energy systems rise and fall with the political tides, and are relatively low in most rural areas in Arizona. This thesis tests the hypothesis that a consumer profile developed to characterize the adopters of renewable energy technology (RET) systems in rural Arizona is the same as the profile of other area residents who performed renovations, upgrades or additions to their homes. Residents of Santa Cruz and Cochise Counties who had obtained building permits to either install a solar or wind energy system or to perform a substantial renovation or upgrade to their home were surveyed to gather demographic, psychographic and behavioristic data. The data from 133 survey responses (76 from RET adopters and 57 from non-adopters) provided insights about their decisions regarding whether or not to adopt a RET system. The results, which are statistically significant at the 99% level of confidence, indicate that RET adopters had smaller households, were older and had higher education levels and greater income levels than the non-adopters. The research also provides answers to three related questions: First, are the energy conservation habits of RET adopters the same as those of non-adopters? Second, what were the sources of information consulted and the most important factors that motivated the decision to purchase a solar or wind energy system? And finally, are any of the factors which influenced the decision to live in a rural area in southeastern Arizona related to the decision to purchase a renewable energy system? The answers are provided, along with a series of recommendations that are designed to inform marketers and other promoters of RETs about how to utilize these results to help achieve their goals.

  14. Upgraded wood residue fuels 1995

    International Nuclear Information System (INIS)

    Vinterbaeck, J.

    1995-01-01

    The Swedish market for upgraded residue fuels, i.e. briquettes, pellets and wood powder, has developed considerably during the nineties. The additional costs for the upgrading processes are regained and create a surplus in other parts of the system, e.g. in the form of higher combustion efficiencies, lower investment costs for burning equipment, lower operation costs and a diminished environmental impact. All these factors put together have resulted in a rapid growth of this part of the energy sector. In 1994 the production was 1.9 TWh, an increase of 37 % compared to the previous year. In the forthcoming heating season 1995/96 the production may reach 4 TWh. 57 refs, 11 figs, 6 tabs

  15. A determination of H-0 with the class gravitational lens B1608+656. I. Time delay measurements with the VLA

    NARCIS (Netherlands)

    Fassnacht, CD; Pearson, TJ; Readhead, ACS; Browne, IWA; Koopmans, LVE; Myers, ST; Wilkinson, PN

    1999-01-01

    We present the results of a program to monitor the four-image gravitational lens B1608 + 656 with the VLA. The system was observed over a 7 month period from 1996 October to 1997 May. The 64 epochs of observation have an average spacing of 3.6 days. The light curves of the four images of the

  16. The TEXT upgrade vertical interferometer

    International Nuclear Information System (INIS)

    Hallock, G.A.; Gartman, M.L.; Li, W.; Chiang, K.; Shin, S.; Castles, R.L.; Chatterjee, R.; Rahman, A.S.

    1992-01-01

    A far-infrared interferometer has been installed on TEXT upgrade to obtain electron density profiles. The primary system views the plasma vertically through a set of large (60-cm radialx7.62-cm toroidal) diagnostic ports. A 1-cm channel spacing (59 channels total) and fast electronic time response is used, to provide high resolution for radial profiles and perturbation experiments. Initial operation of the vertical system was obtained late in 1991, with six operating channels

  17. Upgrading Temelin to international standards

    International Nuclear Information System (INIS)

    Anderson, J.J.; Gisoni, G.A.; Stormer, T.D.

    1994-01-01

    The digital technology being installed to upgrade the Instrumentation and Control system at the Temelin twin VVER-1000 station in the Czech Republic will allow the plant to operate more safely because it allows key information to be organised and presented to the operators, enabling them to make better informed decisions about the status of the plant. The new system is based on proven technology previously applied at Beznau in Switzerland and Sizewell B in the UK. (author)

  18. Injection Protection Upgrade for the HL-LHC

    CERN Document Server

    AUTHOR|(CDS)2067108; Biancacci, Nicolo; Bracco, Chiara; Frasciello, Oscar; Gentini, Luca; Goddard, Brennan; Lechner, Anton; Maciariello, Fausto; Perillo Marcone, Antonio; Salvant, Benoit; Shetty, Nikhil Vittal; Steele, Genevieve; Velotti, Francesco; Zobov, Mikhail

    2015-01-01

    The injector complex of the LHC is undergoing important changes in the light of the LIU project to provide brighter beams to the LHC. For this reason and as part of the High Luminosity LHC project the injection protection system of the LHC will be upgraded in the Long Shutdown 2 (2018 - 2019) to be able to protect downstream elements against injection failures with the high brightness, high intensity HL-LHC beams. The upgraded LHC injection protection system will consist of a segmented injection protection absorber TDIS, and auxiliary collimators and masks. The layout modifications are described, and the machine element protection and absorber jaw robustness studies are presented for the new systems.

  19. Upgraded fuel from reed canary grass

    Energy Technology Data Exchange (ETDEWEB)

    Heiskanen, V P

    1996-12-31

    The feasibility of RCG for commercial utilization depends primarily on its applicability for pulp production and its use in energy production will be based on the residue that will be available after extracting the pulp fraction of the RCG. Roughly 20 ..30% of the material will be available for energy production purposes. However, the percentage may be higher/lower depending on the quality standards of the pulp fiber material. The harvesting period has a significant effect on the fuel characteristics of RCG. For instance the contents of N, S, Cl, K are clearly lower if the RCG is harvested in the spring (delayed) instead of summer/autumn. These elements affect significantly overall emission formation and ash behaviour and its melting temperature. The combustion related research in this project has been focused on the spring-harvested RCG. The project aims to evaluate the feasibility of delayed harvested RCG for energy production. In order to reach this goal, the following combustion methods will be tested and studied: combustion of pelletized RCG; gasification; combustion of pulverized RCG. In addition, pelletizing, reactivity and NO conversion of pulverized RCG will be studied. The research described here is a part of `Reed Canary Grass` project (in AIR programme). The contractors of the project are Swedish University of Agricultural Sciences (coordinator), United Milling Systems from Denmark, Jaakko Poeyry Oy and VTT Energy. In addition, there are partners from several countries participating in the project. The project has been divided in five tasks, VTT Energy being responsible for combustion related task `Upgraded fuel` that includes the research topics discussed in this paper

  20. Upgraded fuel from reed canary grass

    Energy Technology Data Exchange (ETDEWEB)

    Heiskanen, V.P.

    1995-12-31

    The feasibility of RCG for commercial utilization depends primarily on its applicability for pulp production and its use in energy production will be based on the residue that will be available after extracting the pulp fraction of the RCG. Roughly 20 ..30% of the material will be available for energy production purposes. However, the percentage may be higher/lower depending on the quality standards of the pulp fiber material. The harvesting period has a significant effect on the fuel characteristics of RCG. For instance the contents of N, S, Cl, K are clearly lower if the RCG is harvested in the spring (delayed) instead of summer/autumn. These elements affect significantly overall emission formation and ash behaviour and its melting temperature. The combustion related research in this project has been focused on the spring-harvested RCG. The project aims to evaluate the feasibility of delayed harvested RCG for energy production. In order to reach this goal, the following combustion methods will be tested and studied: combustion of pelletized RCG; gasification; combustion of pulverized RCG. In addition, pelletizing, reactivity and NO conversion of pulverized RCG will be studied. The research described here is a part of `Reed Canary Grass` project (in AIR programme). The contractors of the project are Swedish University of Agricultural Sciences (coordinator), United Milling Systems from Denmark, Jaakko Poeyry Oy and VTT Energy. In addition, there are partners from several countries participating in the project. The project has been divided in five tasks, VTT Energy being responsible for combustion related task `Upgraded fuel` that includes the research topics discussed in this paper

  1. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    Biogas production has considerable development possibilities not only in Finland but all over the world since it it the easiest way of creating value out of various waste fractions and represents an alternative source of renewable energy. Development of efficient biogas upgrading technology has become an important issue since it improves the quality of biogas and for example facilitating its injection into the natural gas pipelines. Moreover, such upgrading contributes to resolving the issue of increasing CO{sub 2} emissions and addresses the increasing climate change concerns. Together with traditional CO{sub 2} capturing technologies a new class of recently emerged sorbents such as ionic liquids is claimed as promising media for gas separations. In this thesis, an extensive comparison of the performance of different solvents in terms of CO{sub 2} capture has been performed. The focus of the present study was on aqueous amine solutions and their mixtures, traditional ionic liquids, 'switchable' ionic liquids and poly(ionic liquid)s in order to reveal the best option for biogas upgrading. The CO{sub 2} capturing efficiency for the most promising solvents achieved values around 50-60 L CO{sub 2}/L absorbent. These values are superior to currently widely applied water wash biogas upgrading system. Regeneration of the solvent mixtures appeared to be challenging since the loss of initial efficiency upon CO{sub 2} release was in excess of 20-40 vol %, especially in the case of aqueous amine solutions. In contrast, some of the ionic liquids displayed reversible behavior. Thus, for selected 'switchable' ionic and poly(ionic liquid)s the CO{sub 2} absorption/regeneration cycles were performed 3-4 times without any notable efficiency decrease. The viscosity issue, typical for ionic liquids upon CO{sub 2} saturation, was addressed and the information obtained was evaluated and related to the ionic interactions. The occurrence of volatile organic compounds

  2. The STAR beam energy scan phase II physics and upgrades

    Czech Academy of Sciences Publication Activity Database

    Yang, C.; Adamczyk, L.; Adkins, J. K.; Agakishiev, G.; Bielčík, J.; Bielčíková, Jana; Chaloupka, P.; Federič, Pavol; Rusňák, Jan; Rusňáková, O.; Šimko, Miroslav; Šumbera, Michal; Vértési, Robert

    2017-01-01

    Roč. 967, č. 11 (2017), s. 800-803 ISSN 0375-9474 R&D Projects: GA MŠk LG15001; GA MŠk LM2015054 Institutional support: RVO:61389005 Keywords : STAR collaboration * BES-II * detector upgrade * QCD phase diagram * physics oppotrunity Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders OBOR OECD: Nuclear physics Impact factor: 1.916, year: 2016

  3. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Lee, Dong Young; Cha, Kyung Ho; Park, Won Man; Song, Soon Ja; Lee, Jung Woon; Oh, In Seok; Moon, Byung Sou; Ham, Chang Shik; Seh, Kyung Won; Joo, Young Chang; Lee, Eui Jin

    1999-12-01

    We developed techniques for upgrading nuclear power plant simulators that lost some function due to aging and obsolescence of parts. This project will provide a guidance for resolving the problems with aged simulators. We transplanted the simulation code operated in Macro-VAX II into the HP workstation with operating system version 10.20. If further research is proceeded, it will be possible to build simulator system on PCs. (author)

  4. Gas Permeation Processes in Biogas Upgrading: A Short Review

    Czech Academy of Sciences Publication Activity Database

    Kárászová, Magda; Sedláková, Zuzana; Izák, Pavel

    2015-01-01

    Roč. 69, č. 10 (2015), s. 1277-1283 ISSN 0366-6352 R&D Projects: GA MŠk(CZ) LD14094; GA MŠk LH14006; GA ČR GA14-12695S Institutional support: RVO:67985858 Keywords : biogas upgrading * memranes * gas permeation Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 1.326, year: 2015

  5. Upgrade of the Control System of the IFUNAM's Pelletron Accelerator

    OpenAIRE

    Macias, R.; Chavez, E.; Ortiz, M. E.; Lopez, K.; Huerta, A.; Verde, M. C.

    2001-01-01

    In 1995 a 9SDH-2 Pelletron from NEC was installed at IFUNAM (Instituto de Fisica, Universidad Nacional Autonoma de Mexico). Two beam lines have been operational since then and two new lines have been built. In order to perform the planned projects in this grown facility, an upgrading of the original manual control system is required. The proposed new control system takes advantage of the existing devices and incorporates the electronics needed for the newer beam lines. The control software fr...

  6. The North West Sturgeon Upgrader: Good Money after Bad?

    Directory of Open Access Journals (Sweden)

    F.L. Ted Morton

    2015-04-01

    Full Text Available The North West Upgrader (NWU project illustrates the risks of government-led efforts to diversify Alberta’s economy. What began as a low-risk, low-cost project to encourage domestic bitumen upgrading has morphed into a multi-billion dollar boondoggle with high risks for Alberta taxpayers. Originally, the Government of Alberta (GOA intended to collect bitumen from producers in lieu of royalties and sell it to provincial upgraders, adding value to the commodity and creating jobs and revenues in Alberta. The private sector was to build and finance the new upgraders, as well as assume the market risks of low margins. The 2008 financial collapse effectively killed that plan. With just one prospect (NWU remaining, the Stelmach government decided to be more than the middleman. The GOA committed to retain ownership of the bitumen up to the point of sale, pay NWU a toll for the processing, and then sell the upgraded product. Under a new “take or pay” arrangement, the GOA assumed liabilities estimated at $19 billion over the 30-year contract with NWU, as well as the market risk of having to sell the upgraded product at below costs. As four different premiers and six different energy ministers cycled through Edmonton, construction costs soared to over $8 billion. The original $6.5 billion cap on the GOA’s liability for construction costs disappeared, and the GOA—and by extension, Alberta taxpayers— are now on the hook for $26 billion in processing payments — the equivalent of $63 per barrel. Falling oil prices are further undermining the prospects for the investment to break even. Written from a rare insider’s perspective, this paper analyzes the lack of effective government oversight and due diligence surrounding the North West Upgrade. Rather than being an exception, NWU fits the larger and longer pattern of failed “forced-growth” diversification initiatives in Alberta and other provinces. Alberta politicians should think long and

  7. Recent Upgrade of the Klystron Modulator at SLAC

    International Nuclear Information System (INIS)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.

    2011-01-01

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 μS at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 μS at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  8. The ATLAS SCT: Commissioning experience and SLHC upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Mitrevski, J. [Santa Cruz Institute for Particle Physics, University of California, Santa Cruz, CA 95064 (United States)], E-mail: Jovan.Mitrevski@cern.ch

    2009-06-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  9. The ATLAS SCT: Commissioning experience and SLHC upgrade

    International Nuclear Information System (INIS)

    Mitrevski, J.

    2009-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  10. Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System

    Science.gov (United States)

    Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.

    2011-03-01

    The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.

  11. VLA and CARMA observations of protostars in the Cepheus clouds: Sub-arcsecond proto-binaries formed via disk fragmentation

    Energy Technology Data Exchange (ETDEWEB)

    Tobin, John J.; Looney, Leslie W. [National Radio Astronomy Observatory, Charlottesville, VA 22903 (United States); Chandler, Claire J. [National Radio Astronomy Observatory, Socorro, NM (United States); Wilner, David J.; Bourke, Tyler L. [Harvard-Smithsonian Center for Astrophysics, Cambridge, MA 02138 (United States); Loinard, Laurent; D' Alessio, Paola [Centro de Radioastronomía y Astrofísica, UNAM, Apartado Postal 3-72 (Xangari), 58089 Morelia, Michoacán (Mexico); Chiang, Hsin-Fang [Institute for Astronomy and NASA Astrobiology Institute, University of Hawaii at Manoa, Hilo, HI 96720 (United States); Hartmann, Lee; Calvet, Nuria [Department of Astronomy, University of Michigan, Ann Arbor, MI 48109 (United States); Kwon, Woojin, E-mail: jtobin@nrao.edu [SRON Netherlands Institute for Space Research, Landleven 12, 9747 AD Groningen (Netherlands)

    2013-12-20

    We present observations of three Class 0/I protostars (L1157-mm, CB230 IRS1, and L1165-SMM1) using the Karl G. Jansky Very Large Array (VLA) and observations of two (L1165-SMM1 and CB230 IRS1) with the Combined Array for Research in Millimeter-wave Astronomy (CARMA). The VLA observations were taken at wavelengths of λ = 7.3 mm, 1.4 cm, 3.3 cm, 4.0 cm, and 6.5 cm with a best resolution of ∼0.''06 (18 AU) at 7.3 mm. The L1165-SMM1 CARMA observations were taken at λ = 1.3 mm with a best resolution of ∼0.''3 (100 AU) and the CB230 IRS1 observations were taken at λ = 3.4 mm with a best resolution of ∼3'' (900 AU). We find that L1165-SMM1 and CB230 IRS1 have probable binary companions at separations of ∼0.''3 (100 AU) from detections of secondary peaks at multiple wavelengths. The position angles of these companions are nearly orthogonal to the direction of the observed bipolar outflows, consistent with the expected protostellar disk orientations. We suggest that these companions may have formed from disk fragmentation; turbulent fragmentation would not preferentially arrange the binary companions to be orthogonal to the outflow direction. For L1165-SMM1, both the 7.3 mm and 1.3 mm emission show evidence of a large (R > 100 AU) disk. For the L1165-SMM1 primary protostar and the CB230 IRS1 secondary protostar, the 7.3 mm emission is resolved into structures consistent with ∼20 AU radius disks. For the other protostars, including L1157-mm, the emission is unresolved, suggesting disks with radii <20 AU.

  12. Upgrade of the ALICE muon trigger electronics

    International Nuclear Information System (INIS)

    Dupieux, P; Joly, B; Jouve, F; Manen, S; Vandaële, R

    2014-01-01

    The ALICE muon trigger is a large scale detector based on single gap bakelite RPCs. An upgrade of the electronics is needed in order to withstand the increase of luminosity after the LHC Long Shutdown-2 in 2018-2019. The detector will be read out at the minimum bias rate of 100 kHz in Pb–Pb collisions (including a safety factor of 2), two orders of magnitude above the present design. For the most exposed RPCs and in the present conditions of operation, the total integrated charge could be as high as 100 mC/cm 2 with rates up to 100 Hz/cm 2 , which is above the present limit for safe operation. In order to overcome these limitations, upgrade projects of the Front-End (FE) and Readout Electronics are scheduled. The readout upgrade at high rate with low dead time requires changing most of the present electronics. It involves a new design for the 234 Local cards receiving the LVDS signals from the FE electronics and the 16 Regional concentrator cards. The readout chain is completed by a single Common Readout Unit developed for most ALICE sub-detectors. The new architecture of the muon trigger readout will be briefly presented. The present FE electronics, designed for the streamer mode, must be replaced to prevent ageing of the RPCs in the future operating conditions. The new FE called FEERIC (for Front-End Electronics Rapid Integrated Circuit) will have to perform amplification of the analog input signals. This will allow for RPC operation in a low-gain avalanche mode, with a much smaller charge deposit (factor 3-5) in the detector as compared to the present conditions. The purpose is to discriminate RPC signals with a charge threshold around 100 fC, in both polarities, and with a time jitter below 1 ns. We will describe the FE card and FEERIC ASIC features and first prototype performance, report on test results obtained on a cosmic test bench and discuss ongoing developments

  13. Upgrading of the model to determine the economic and financial feasibility of a hotel

    OpenAIRE

    Neves, Beatriz

    2017-01-01

    This work project encompasses the upgrading of an already existing model to determine a hotel´s economic and financial feasibility, by adding some figures that give more information to the hotel managers and, therefore, can guide them in their strategic decisions. This upgrading was conducted to adapt the model to the changes that are going on in the hospitality industry such as, the growing importance of digital technology, that is changing the balance of power towards the consumer side and ...

  14. Climate adaptation of buildings through MOM- and upgrading - State of the art and research needs

    OpenAIRE

    Grynning, Steinar; Wærnes, Elisabeth Gaal; Kvande, Tore; Time, Berit

    2017-01-01

    This study presents an overview of research initiatives and projects addressing climate adaption in management operation and maintenance (MOM) and upgrade of existing buildings. The aim was to identify knowledge needs and research demand necessary for decision makers to address climate adaptation in their MOM and upgrade plans. Climate adaptation of buildings in the Norwegian climate very much concerns increased moisture robustness and risk reduction of moisture damages. Thus, a strong focus ...

  15. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  16. The Upgraded D0 detector

    Energy Technology Data Exchange (ETDEWEB)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U.

    2005-07-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  17. Upgrades and their training impact

    International Nuclear Information System (INIS)

    Geise, W.B.

    1991-01-01

    In January, 1990, implementation of thermal hydraulic and core model upgrades to the Brunswick Simulator was completed. Static and dynamic NRC examination preparation, Licensed Operator Requalification training and training material development had to be completed to support an April, 1990's NRC exam date. Dramatic simulator improvements resulted in expanded performance. Unfortunately, insufficient time was available to fully retrain operators before their examinations. Because of this and other factors, the examinations resulted in 14 of 20 operators failing the dynamic simulator examination. The following paper describes the BSEP simulator impact on Licensed Training in 1990

  18. LHC Status and Upgrade Challenges

    Science.gov (United States)

    Smith, Jeffrey

    2009-11-01

    The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.

  19. ECRH experiments in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Guenter, S.; Hobirk, J.; Kirov, K.; Ryter, F.; Wolf, R.; Zohm, H.; Gantenbein, G.

    2001-01-01

    In ASDEX Upgrade ECRH and ECCD with a power of up to 2 MW has been used. With counter ECCD in discharges with an internal transport barrier we achieved an electron temperature of ≅13 keV. In low density ohmic plasmas we obtained an rf driven current of ≅80% both in co- and counter directions. Neoclassical tearing modes have been completly stabilised by driving a current on the resonant q-surface. Electron heat transport has been studied in standard L- and H-mode plasmas and can be described by a dependence on a critical electron temperature gradient

  20. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  1. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    International Nuclear Information System (INIS)

    Brenman, O.; Chernyshov, M. A.; Denning, R. S.; Kolesov, S. A.; Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I.; Trosman, G.

    2006-01-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  2. Numerical analysis and optimisation of heavy water upgrading column

    International Nuclear Information System (INIS)

    Sankar, Rama; Ghosh, Brindaban; Bhanja, K.

    2013-01-01

    In the 'Pressurised Heavy Water' type of reactors, heavy water is used both as moderator and coolant. During operation of reactor downgraded heavy water is generated that needs to be upgraded for reuse in the reactor. When the isotopic purity of heavy water becomes less than 99.75%, it is termed as downgraded heavy water. Downgraded heavy water also contains impurity such as corrosion products, dirt, oil etc. Upgradation of downgraded heavy water is normally done in two steps: (i) Purification: In this step downgraded heavy water is first purified to remove corrosion products, dirt, oil, etc. and (ii) Upgradation of heavy water to increase its isotopic purity, this step is carried out by vacuum distillation of downgraded heavy water after purification. This project is aimed at mathematical modelling and numerical simulation of heavy water upgrading column. Modelling and simulation studies of the upgradation column are based on equilibrium stage model to evaluate the effect of feed location, pressure, feed composition, reflux ratio in the packed column for given reboiler and condenser duty of distillation column. State to stage modelling of two-phase two-component flow has constitutes the overall modelling of the column. The governing equations consist of stage-wise species and overall mass continuity and stage-wise energy balance. This results in tridigonal matrix equation for stage liquid fractions for heavy and light water. The stage-wise liquid flow rates and temperatures are governed by stage-wise mass and energy balance. The combined form of the corresponding governing equations, with the incorporation of thermodynamic equation of states, form a system of nonlinear equations. This system have been resolved numerically using modified Newton-Raphson method. A code in the MATLAB platform has been developed by on above numerical procedure. The optimisation of the column operating conditions is to be carried out based on parametric studies and analysis of different

  3. Plant process computer system upgrades at the KSG simulator centre

    International Nuclear Information System (INIS)

    2006-01-01

    The human-machine interface (HMI) of a modern plant process computer system (PPC) differs significantly from that of older systems. Along with HMI changes, there are often improvements to system functionality such as alarm display and printing functions and transient data analysis capabilities. Therefore, the upgrade or replacement of a PPC in the reference plant will typically require an upgrade of the simulator (see Section 6.5.1 for additional information). Several options are available for this type of project including stimulation of a replica system,or emulation, or simulation of PPC functionality within the simulation environment. To simulate or emulate a PCC, detailed knowledge of hardware and software functionality is required. This is typically vendor proprietary information, which leads to licensing and other complications. One of the added benefits of stimulating the PPC system is that the simulator can be used as a test bed for functional testing (i.e. verification and validation) of the system prior to installation in the reference plant. Some of this testing may include validation of the process curve and system diagram displays. Over the past few years several German NPPs decided to modernize their plant process computer (PPC) systems. After the NPPs had selected the desired system to meet their requirements the question arose how to modernize the PPC systems on the corresponding simulators. Six German NPPs selected the same PPC system from the same vendor and it was desired to perform integral tests of the HMI on the simulators. In this case the vendor offered a stimulated variant of their system and it therefore made sense to choose that implementation method for upgrade of the corresponding simulators. The first simulator PPC modernization project can be considered as a prototype project for the follow-on projects. In general, from the simulator project execution perspective the implementation of several stimulated PPC systems of the same type

  4. ALICE Upgrades: Plans and Potentials

    CERN Document Server

    Tieulent, Raphael

    2015-01-01

    The ALICE collaboration consolidated and completed the installation of current detectors during LS1 with the aim to accumulate 1 nb$^{-1}$ of Pb-Pb collisions during Run 2 corresponding to about 10 times the Run 1 integrated luminosity. In parallel, the ALICE experiment has a rich detector upgrade programme scheduled during the second LHC long shutdown (LS2, 2018-2019) in order to fully exploit the LHC Runs 3 and 4. The main objectives of this programme are: improving the tracking precision and enabling the read-out of all Pb-Pb interactions at a rate of up to 50 kHz, with the goal to record an integrated luminosity of 10 nb$^{-1}$ after LS2 in minimum-bias trigger mode. This sample would represent an increase by a factor of one hundred with respect to the minimum-bias sample expected during Run 2. The implementation of this upgrade programme, foreseen in LS2, includes: a new low-material Inner Tracking System at central rapidity with a forward rapidity extension to add vertexing capabilities to the current M...

  5. Upgrade and modernization of NBSR

    International Nuclear Information System (INIS)

    Williams, Robert E.

    1995-01-01

    The NBSR, a 20-MW research reactor operated by the National Institute of Standards and Technology, has become the leading US laboratory in neutron research. About 1000 scientists from 200 industries, government and foreign laboratories, and universities conducted experiments at the NBSR in 19931. Since 1990, when the first instruments in the Cold Neutron Research Facility (CNRF) became available, the number of research participants has doubled. A major program of modernization and facility upgrade was initiated in order to meet this growing demand, and to assure safe and reliable reactor operations for 30 additional years. A scheduled shutdown, begun in late May 1994, is nearing completion at this writing (May 1995). To upgrade the CNRF, the D 2 0 cold neutron source has been replaced with a liquid hydrogen cold source, and the remaining four neutron guides are being installed. In addition, the primary and secondary cooling systems have been modernized with the installation of plate heat exchangers, and the refueling system has been completely refurbished. Periodic maintenance is also being done. The entire D20 primary coolant inventory is about to be replaced, and new shim arms have been installed

  6. Formaldehyde OMI operational retrieval upgrades

    Science.gov (United States)

    Gonzalez Abad, G.; Chance, K.; Liu, X.

    2013-05-01

    Total column of formaldehyde (HCHO), a proxy for biogenic emissions, can be observed from satellites using the ultraviolet region of the spectrum. The operational HCHO retrievals from the Ozone Monitoring Instrument (OMI) on board the AURA satellite, part of NASA's A-train constellation of Earth Observing satellites, are described. The operational retrieval, based on a basic optical absorption spectroscopy (BOAS) algorithm, has been affected by the degradation of the instrument especially from 2008 onwards. The most significant problems are the unrealistic increasing high background concentrations of HCHO retrieved from OMI and the row anomaly. An upgrade for the original operational algorithm is therefore needed to ensure its trend quality and to account for these difficulties. The strategies implemented to deal with the instrumental degradation are presented here. Air mass factors (AMFs) in the current fitting window show significant wavelength dependence. Fitting uncertainties can potentially be improved by including shorter wavelengths as long as the AMFs wavelength dependence is taken into account. As part of these improvements a look-up table of wavelength-dependent AMFs have been calculated. Using this new table it is possible to retrieve the HCHO total column directly, weighting the HCHO cross sections with the wavelength-dependent AMFs. Additionally, the pixels affected by the row anomaly are now flagged in the level 2 data generated with the upgraded algorithm.

  7. Analysis Efforts Supporting NSTX Upgrades

    International Nuclear Information System (INIS)

    Zhang, H.; Titus, P.; Rogoff, P.; Zolfaghari, A.; Mangra, D.; Smith, M.

    2010-01-01

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  8. Heavy water upgrader of 'Fugen'

    International Nuclear Information System (INIS)

    Matsushita, Tadashi; Sasaki, Shigeo

    1980-01-01

    The nuclear power station of the advanced thermal prototype reactor ''Fugen'' has continued the smooth operation since it started the fullscale operation in March, 1979. Fugen is the first heavy water-moderated, boiling light water-cooled reactor in Japan, and its outstanding feature is the use of heavy water as the moderator. The quantity of heavy water retained in Fugen is about 140 m 3 , and the concentration is 99.8 wt.%. This heavy water had been made is USA, and was imported from F.R. of Germany where it had been used. Heavy water is an internationally regulated material, and it is very expensive and hard to purchase. Therefore in order to prevent the deterioration of heavy water and to avoid its loss as far as possible, the management of the quantity and the control of the water quality have been carried out carefully and strictly. The generation of deteriorated heavy water occurs from the exchange of ion exchange resin for poison removal and purification. The heavy water upgrader reconcentrates the deteriorated heavy water of high concentration and returns to the heavy water system, and it was installed for the purpose of reducing the purchase of supplementary heavy water. The outline of the heavy water upgrader, its construction, the performance test and the operation are described. (Kako, I.)

  9. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  10. Environmental impact assessment of oilfield upgrades in Bohai Sea

    Science.gov (United States)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  11. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  12. Upgrade of the CERN SPS Extraction Protection Elements TPS

    CERN Document Server

    Borburgh, Jan; Barnes, Michael; Baud, Cedric; Fraser, Matthew; Kain, Verena; Maciariello, Fausto; Steele, Genevieve; Velotti, Francesco

    2017-01-01

    In 2006 the protection devices upstream of the septa in both extraction channels of the CERN SPS to the LHC were installed. Since then, new beam parameters have been proposed for the SPS beam towards the LHC in the framework of the LIU project. The mechanical parameters and assumptions on which these protection devices presently have been based, need validation before the new upgraded versions can be designed and constructed. The paper describes the design assumptions for the present protection device and the testing program for the TPSG4 at HiRadMat to validate them. Finally the requirements and the options to upgrade both extraction protection elements in the SPS are described.

  13. Silicon strip detectors for the ATLAS HL-LHC upgrade

    CERN Document Server

    Gonzalez Sevilla, S; The ATLAS collaboration

    2011-01-01

    The LHC upgrade is foreseen to increase the ATLAS design luminosity by a factor ten, implying the need to build a new tracker suited to the harsh HL-LHC conditions in terms of particle rates and radiation doses. In order to cope with the increase in pile-up backgrounds at the higher luminosity, an all silicon detector is being designed. To successfully face the increased radiation dose, a new generation of extremely radiation hard silicon detectors is being designed. We give an overview of the ATLAS tracker upgrade project, in particular focusing on the crucial innermost silicon strip layers. Results from a wide range of irradiated silicon detectors for the strip region of the future ATLAS tracker are presented. Layout concepts for lightweight yet mechanically very rigid detector modules with high service integration are shown.

  14. Modernization and power upgrading of the Loviisa NPP

    International Nuclear Information System (INIS)

    Keskinen, A.

    1997-01-01

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.)

  15. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  16. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A [IVO Power Engineering Ltd., Vantaa (Finland)

    1998-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  17. Muon Physics at Run-I and its upgrade plan

    Directory of Open Access Journals (Sweden)

    Benekos Nektarios Chr.

    2015-01-01

    Full Text Available The Large Hadron Collider (LHC and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  18. Expected performance of the upgrade ATLAS experiment for HL-LHC

    CERN Document Server

    Liu, Peilian; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) has been successfully delivering proton-proton collision data at the unprecedented center of mass energy of 13 TeV. An upgrade is planned to increase the instantaneous luminosity delivered by the LHC in what is called the HL-LHC, aiming to deliver a total of up 3000/fb to 4000/fb of data per experiment. To cope with the expected data-taking conditions ATLAS is planning major upgrades of the detector. It is now a critical time for these upgrade projects and during the last year and a half, six Technical Design Reports (TDR) were produced by the ATLAS Collaboration. In these TDRs the physics motivation and benefits of such upgrades are discussed together with details on the upgrade project itself. In this contribution we review the expected performance of the upgraded ATLAS detector and the expected reach for physics measurements as well as the discovery potential for new physics that is expected by the end of the HL-LHC data-taking. The performance of object reconstruction under...

  19. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  20. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  1. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  2. FTU bolometer electronic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pollastrone, Fabio, E-mail: fabio.pollastrone@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Neri, Carlo; Florean, Marco; Ciccone, Giovanni [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2013-10-15

    Highlights: ► Design and realization of a new bolometer electronic system. ► Many improvements over the actual commercial system. ► Architecture based on digital electronic hardware with minimal analog front end. ► Auto off-set correction, real time visualization features and small system size. ► Test results for the electronic system. -- Abstract: The FTU (Frascati Tokamak Upgrade) requires a bolometer diagnostic in order to measure the total plasma radiation. The current diagnostic architecture is based on a full analog multichannel AC bolometer system, which uses a carrier frequency amplifier with a synchronous demodulation. Taking into account the technological upgrades in the field of electronics, it was decided to realize an upgrade for the bolometric electronic system by using a hybrid analog/digital implementation. The new system developed at the ENEA Frascati laboratories has many improvements, and mainly a massive system volume reduction, a good measurement linearity and a simplified use. The new hardware system consists of two subsystems: the Bolometer Digital Control and the Bolometer Analog System. The Bolometer Digital Control can control 16 bolometer bridges through the Bolometer Analog System. The Bolometer Digital Control, based on the FPGA architecture, is connected via Ethernet with a PC; therefore, it can receive commands settings from the PC and send the stream of bolometric measurements in real time to the PC. In order to solve the cross-talk between the bridges and the cables, each of the four bridges in the bolometer head receives a different synthesized excitation frequency. Since the system is fully controlled by a PC GUI (Graphic User Interface), it is very user friendly. Moreover, some useful features have been developed, such as: auto off-set correction, bridge amplitude regulation, software gain setting, real time visualization, frequency excitation selection and noise spectrum analyzer embedded function. In this paper, the

  3. Safety upgrading of the PAKS Nuclear Plant

    International Nuclear Information System (INIS)

    Vamos, G.; Vigassy, J.

    1993-01-01

    In the last several years the net electricity from the Paks NPP represents almost half of the Hungarian total. The 4 units of Paks belong to the latest generation of the VVER-440 units, the small-sized Russian designed PWRs. Reviewing the main design features of them, the safety merits and safety concerns are summarized. Due to the conservative design and the extensive operating experience the safety merits appear to be more significant than generally believed. The VVER-440 type has two models, the 230 and 213, which have a large number of distinctive safety features. These are highlighted in the section comparisons. A quality assurance program was initiated in Paks very early. A long-term safety upgrading program was also initiated, originating from vendor recommendations, regulatory decisions, in-house operating experience and safety concerns, and independent reviews. The main areas and some examples of the measures are described. This program, like all other activities related to nuclear safety, has been under regulatory control. The specific features of the Hungarian regulatory system are described. For advanced, general and new evaluation of the safety of the units in Paks in accordance with the internationally recommended criteria of the 90's, the project AGNES has been launched with international participation. The scope of this project is summarized. International efforts as the IAEA Regional Project on safety assessment of VVER-440/213 and VVER-440/230 units are underway. Since safety is not only a question of design, but it can be significantly influenced by operations and maintenance practices, the Paks NPP has invited LAEA's OSART and ASSET missions, WANO's Pilot Peer Review

  4. Superconducting magnet development for the LHC upgrades

    International Nuclear Information System (INIS)

    Rossi, Lucio

    2012-01-01

    LHC is now delivering proton and heavy ion collisions at the highest energy. Upgrading the LHC beyond its design performance is a long term program that started during the LHC construction, with some fundamental R and D programs. The upgrade program is based on a vigorous superconductor and magnet R and D, aimed at increasing the field in accelerator magnets from 8 T to 12 T for the luminosity upgrade, with the scope of increasing the collider luminosity by a factor 5 to 10 from 2022. The upgrade program might continue with the LHC energy upgrade, which would require magnets producing field in the range of 16-20 T. The results obtained so far and the future challenges are discussed together with the possible plan to reach the goals. (author)

  5. Upgrade of the Annular Core Pulse Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Reuscher, J A [Sandia Laboratories, Albuquerque, NM (United States)

    1976-07-01

    The Annular Core Pulse Reactor (ACPR) is a TRIGA type reactor which has been in operation at Sandia Laboratories since 1967. The reactor is utilized in a wide variety of experimental programs which include radiation effects, neutron radiography, activation analysis, and fast reactor safety. During the past two years, the ACPR has become an important experimental facility for the United States Fast Reactor Safety Research Program and questions of interest to the safety of the LMFBR are being addressed. In order to enhance the capabilities of the ACPR for reactor safety experiments, a project to improve the performance of the reactor was initiated. It is anticipated that the pulse fluence can be increased by a factor of 2.0 to 2.5 by utilizing a two-region core concept with high heat capacity fuel elements around the central irradiation cavity. In addition, the steady-state power of the reactor will be increased by about a factor of two. Preliminary studies have identified several potential approaches to the ACPR performance improvement. The most promising approach appears to be the two-region core concept. The inner region, surrounding the irradiation cavity, would consist of a high-heat capacity fuel capable of absorbing the fission energy associated with a large nuclear pulse. The number of fissions occurring near the cavity would be greatly increased which, in turn, would significantly increase the fluence in the cavity. The outer region would consist of a U-ZrH fuel to provide an overall negative temperature coefficient for the two region core. Two candidate high heat capacity fuels [(BeO-UO{sub 2} and UC-ZrC) - graphite] are under consideration. Since this reactor upgrade represents a modification to an existing facility, it can be achieved in a relatively short time. It is anticipated that most of the existing reactor structure can be used for the upgrade. The present core occupies about one-half of the location in the grid plate. The high-heat capacity fuel

  6. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  7. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  8. Five-megajoule homopolar upgrade

    International Nuclear Information System (INIS)

    Bullion, T.M.; Zowarka, R.C.; Aanstoos, T.A.; Weldon, W.F.; Rylander, H.G.; Woodson, H.H.

    1981-01-01

    The five-megajoule homopolar generator (5-MJ HPG) designed and built in 1974 by the Center for Eelctromechanics at the University of Texas at Austin (CEM-UT) was the result of an engineering feasibility study that examined alternate means of pulsed energy storage for controlled thermonuclear fusion experiments. The machine proved very reliable and useful in a variety of applications, notably pulsed resistance welding, and was modified in 1978 to improve its flexibility and ease of maintenance. CEM-UT is now completing a major upgrading of this HPG to a hydraulically motored, 10-MJ, 47-V, 1.02-MA device capable of welding large-section, high-carbon railroad rail. This report considers the design and fabrication of the new rotor, shaft, brush mechanisms, field coil, making switch, busbar system, and control system, as well as the addition of the 31-MPa (4500 psi) hydraulic motoring system. Future applications of the 10-MJ HPG are also discussed

  9. LHCb Upgrade: Scintillating Fibre Tracker

    International Nuclear Information System (INIS)

    Tobin, Mark

    2016-01-01

    The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. All front-end electronics will be replaced and several sub-detectors must be redesigned to cope with higher occupancy. The current tracking detectors downstream of the LHCb dipole magnet will be replaced by the Scintillating Fibre (SciFi) Tracker. The SciFi Tracker will use scintillating fibres read out by Silicon Photomultipliers (SiPMs). State-of-the-art multi-channel SiPM arrays are being developed to read out the fibres and a custom ASIC will be used to digitise the signals from the SiPMs. The evolution of the design since the Technical Design Report in 2014 and the latest R & D results are presented.

  10. The alfalfa “almost darks” campaign: Pilot VLA HI observations of five high mass-to-light ratio systems

    International Nuclear Information System (INIS)

    Cannon, John M.; Martinkus, Charlotte P.; Leisman, Lukas; Haynes, Martha P.; Giovanelli, Riccardo; Hallenbeck, Gregory; Jones, Michael

    2015-01-01

    We present new Very Large Array (VLA) H i spectral line imaging of five sources discovered by the ALFALFA extragalactic survey. These targets are drawn from a larger sample of systems that were not uniquely identified with optical counterparts during ALFALFA processing, and as such have unusually high H i mass to light ratios. The candidate “Almost Dark” objects fall into four broad categories: (1) objects with nearby H i neighbors that are likely of tidal origin; (2) objects that appear to be part of a system of multiple H i sources, but which may not be tidal in origin; (3) objects isolated from nearby ALFALFA H i detections, but located near a gas-poor early type galaxy; (4) apparently isolated sources, with no object of coincident redshift within ∼400 kpc. Roughly 75% of the 200 objects without identified counterparts in the α.40 database (Haynes et al. 2011) fall into category 1 (likely tidal), and were not considered for synthesis follow-up observations. The pilot sample presented here (AGC193953, AGC208602, AGC208399, AGC226178, and AGC233638) contains the first five sources observed as part of a larger effort to characterize H i sources with no readily identifiable optical counterpart at single dish resolution (3.′5). These objects span a range of H i mass [7.41 < log(M Hi ) < 9.51] and H i mass to B-band luminosity ratios (3 < M Hi /L B < 9). We compare the H i total intensity and velocity fields to optical imaging drawn from the Sloan Digital Sky Survey and to ultraviolet imaging drawn from archival GALEX observations. Four of the sources with uncertain or no optical counterpart in the ALFALFA data are identified with low surface brightness optical counterparts in Sloan Digital Sky Survey imaging when compared with VLA H i intensity maps, and appear to be galaxies with clear signs of ordered rotation in the H i velocity fields. Three of these are detected in far-ultraviolet GALEX images, a likely indication of star formation within the last few

  11. The alfalfa “almost darks” campaign: Pilot VLA HI observations of five high mass-to-light ratio systems

    Energy Technology Data Exchange (ETDEWEB)

    Cannon, John M.; Martinkus, Charlotte P. [Department of Physics and Astronomy, Macalester College, 1600 Grand Avenue, Saint Paul, MN 55105 (United States); Leisman, Lukas; Haynes, Martha P.; Giovanelli, Riccardo; Hallenbeck, Gregory; Jones, Michael, E-mail: jcannon@macalester.edu, E-mail: cmartink@macalester.edu, E-mail: leisman@astro.cornell.edu, E-mail: haynes@astro.cornell.edu, E-mail: riccardo@astro.cornell.edu, E-mail: hallenbg@union.edu, E-mail: jonesmg@astro.cornell.edu [Center for Radiophysics and Space Research, Space Sciences Building, Cornell University, Ithaca, NY 14853 (United States); and others

    2015-02-01

    We present new Very Large Array (VLA) H i spectral line imaging of five sources discovered by the ALFALFA extragalactic survey. These targets are drawn from a larger sample of systems that were not uniquely identified with optical counterparts during ALFALFA processing, and as such have unusually high H i mass to light ratios. The candidate “Almost Dark” objects fall into four broad categories: (1) objects with nearby H i neighbors that are likely of tidal origin; (2) objects that appear to be part of a system of multiple H i sources, but which may not be tidal in origin; (3) objects isolated from nearby ALFALFA H i detections, but located near a gas-poor early type galaxy; (4) apparently isolated sources, with no object of coincident redshift within ∼400 kpc. Roughly 75% of the 200 objects without identified counterparts in the α.40 database (Haynes et al. 2011) fall into category 1 (likely tidal), and were not considered for synthesis follow-up observations. The pilot sample presented here (AGC193953, AGC208602, AGC208399, AGC226178, and AGC233638) contains the first five sources observed as part of a larger effort to characterize H i sources with no readily identifiable optical counterpart at single dish resolution (3.′5). These objects span a range of H i mass [7.41 < log(M{sub Hi}) < 9.51] and H i mass to B-band luminosity ratios (3 < M{sub Hi}/L{sub B} < 9). We compare the H i total intensity and velocity fields to optical imaging drawn from the Sloan Digital Sky Survey and to ultraviolet imaging drawn from archival GALEX observations. Four of the sources with uncertain or no optical counterpart in the ALFALFA data are identified with low surface brightness optical counterparts in Sloan Digital Sky Survey imaging when compared with VLA H i intensity maps, and appear to be galaxies with clear signs of ordered rotation in the H i velocity fields. Three of these are detected in far-ultraviolet GALEX images, a likely indication of star formation within

  12. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  13. Upgrade of CERN OP Webtools IRRAD Page

    CERN Document Server

    Vik, Magnus Bjerke

    2017-01-01

    CERN Beams Department maintains a website with various tools for the Operations Group, with one of them being specific for the Proton Irradiation Facility (IRRAD). The IRRAD team use the tool to follow up and optimize the operation of the facility. The original version of the tool was difficult to maintain and adding new features to the page was challenging. Thus this summer student project is aimed to upgrade the web page by rewriting the web page with maintainability and flexibility in mind. The new application uses a server--client architecture with a REST API on the back end which is used by the front end to request data for visualization. PHP is used on the back end to implement the API's and Swagger is used to document them. Vue, Semantic UI, Webpack, Node and ECMAScript 5 is used on the fronted to visualize and administrate the data. The result is a new IRRAD operations web application with extended functionality, improved structure and an improved user interface. It includes a new Status Panel page th...

  14. Upgrading of Sergiev Posad department of Moscow NPO Radon

    International Nuclear Information System (INIS)

    Debieve, Pierre; Delecaut, Gregory; Vanleeuw, Daniel

    2007-01-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  15. Multi-wave band SMM-VLA observations of an M2 flare and an associated coronal mass ejection

    Science.gov (United States)

    Willson, Robert F.; Lang, Kenneth R.; Schmelz, Joan T.; Gonzalez, Raymond D.; Smith, Kermit L.

    1991-01-01

    Results are presented of observations of an M2 flare and an associated coronal mass ejection CME by instruments on the SMM as well as by the VLA and other ground-based observatories on September 30, 1988. The multiwave band data show a gradual slowly changing event which lasted several hours. The microwave burst emission was found to originate in compact moderately circularly polarized sources located near the sites of bright H-alpha and soft X-ray emission. These data are combined with estimates of an electron temperature of 1.5 x 10 to the 7th K and an emission measure of about 2.0 x 10 to the 49th/cu cm obtained from Ca XIX and Fe XXV spectra to show that the microwave emission can be attributed to thermal gyrosynchrotron radiation in regions where the magnetic field strength is 425-650 G. The CME acceleration at low altitudes is measured on the basis of ground- and space-based coronagraphs.

  16. Quasar 3C351: VLA maps and a deep search for optical emission in the outer lobes

    International Nuclear Information System (INIS)

    Kronberg, P.P.; Clarke, J.N.; van den Bergh, S.

    1980-01-01

    VLA radio maps of the quasar 3C351 (z=0.371) at approx.2'' and 0.''4 resolution (a) show interaction with a relatively dense intergalactic medium, (b) show that there is electron acceleration within at least one of the radio lobes, and (c) imply that the intergalactic gas density is different on one side of the source than on the other. Striking similarities are found between the northern radio lobe of 3C351 and one of the outer hotspots of Cygnus A, and possibly other similar systems, in that the outer, on-axis hotspot is resolved and cusp-shaped, and the ''secondary'' off-axis hotspot is more compact. A search for optical emission in the outer lobes shows no emission stronger than 22/sup m/ in the J band and approx.21/sup m/ in the F band. There is also no evidence at these limits for a cluster of galaxies near the radio source, as is suggested by our conclusion that it is interacting with a medium of typical intracluster density

  17. The Wasp-Waist Nebula: VLA Ammonia Observations of the Molecular Core Envelope In a Unique Class 0 Protostellar System

    Science.gov (United States)

    Wiseman, Jennifer

    2010-01-01

    The Wasp-Waist Nebula was discovered in the IRAC c2d survey of the Ophiuchus starforming clouds. It is powered by a well-isolated, low-luminosity, low-mass Class 0 object. Its weak outflow has been mapped in the CO (3-2) transition with the JCMT, in 2.12 micron H2 emission with WIRC (the Wide-Field Infrared Camera) on the Hale 5-meter, and, most recently, in six H2 mid-infrared lines with the IRS (InfraRed Spectrograph) on-board the Spitzer Space Telescope; possible jet twisting structure may be evidence of unique core dynamics. Here, we report results of recent VLA ammonia mapping observations of the dense gas envelope feeding the central core protostellar system. We describe the morphology, kinematics, and angular momentum characteristics of this unique system. The results are compared with the envelope structure deduced from IRAC 8-micron absorption of the PAH (polycyclic aromatic hydrocarbon) background emission from the cloud.

  18. Upgrading the safety of VVER-440/V-230

    International Nuclear Information System (INIS)

    Kelm, P.; Wenk, W.

    1995-01-01

    Besides measures seeking to restore the status as laid down in the project design, especially backfitting measures must be mentioned which serve to ensure component and pipe integrity. Ensuring component integrity is a problem not only of RPV embrittlement, but also of failure prevention. This aspect was not always taken into account properly. Further activities in the field of component integrity will focus on backing the brittle fracture evaluation of the RPV; qualifying the leak-before-breack criterion for the main pipes and in areas with screwed connections; qualifying the program of in-service inspections. Several operators are currently in the process of drafting backfitting programs. The upgrading measures envisaged must be checked as to their balanced nature. In certain plants, the integrity of the RPV coud turn out to be the weak spot in upgrading measures. As a consquence, concepts seeking to achieve upgrading for long periods of time may differ from one location to the next and even between units. Extensive modifications in systems engineering and building structures generally must be evaluated against the expected improvement in safety of the whole plant. (orig.) [de

  19. The magnet system of the Tokamak T-15 upgrade

    International Nuclear Information System (INIS)

    Khvostenko, P.P.; Azizov, E.A.; Alfimov, D.E.; Belyakov, V.A.; Bondarchuk, E.N.; Chudnovsky, A.N.; Dokuka, V.N.; Kavin, A.A.; Khayrutdinov, R.R.; Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N.; Lukash, V.E.; Mineev, A.B.; Muratov, V.P.

    2015-01-01

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  20. The magnet system of the Tokamak T-15 upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Khvostenko, P.P., E-mail: ppkhvost@rambler.ru [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Azizov, E.A.; Alfimov, D.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Belyakov, V.A.; Bondarchuk, E.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Chudnovsky, A.N.; Dokuka, V.N. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Kavin, A.A. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Khayrutdinov, R.R. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Lukash, V.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Mineev, A.B.; Muratov, V.P. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); and others

    2015-10-15

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  1. The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    CERN Document Server

    Andre, Jean-Marc Olivier; Branson, James; Brummer, Philipp Maximilian; Chaze, Olivier; Cittolin, Sergio; Contescu, Cristian; Craigs, Benjamin Gordon; Darlea, Georgiana Lavinia; Deldicque, Christian; Demiragli, Zeynep; Dobson, Marc; Doualot, Nicolas; Erhan, Samim; Fulcher, Jonathan F; Gigi, Dominique; Michail Gladki; Glege, Frank; Gomez Ceballos, Guillelmo; Hegeman, Jeroen Guido; Holzner, Andre Georg; Janulis, Mindaugas; Jimenez Estupinan, Raul; Masetti, Lorenzo; Meijers, Franciscus; Meschi, Emilio; Mommsen, Remigius; Morovic, Srecko; O'Dell, Vivian; Orsini, Luciano; Paus, Christoph Maria Ernst; Petrova, Petia; Pieri, Marco; Racz, Attila; Reis, Thomas; Sakulin, Hannes; Schwick, Christoph; Simelevicius, Dainius; Zejdl, Petr

    2017-01-01

    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of $7.5\\times10^{34}$ cm$^{-2} s^{-1}$ (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. In this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ "data cen...

  2. Evaluation of (68)Ga- and (177)Lu-DOTA-PEG4-LLP2A for VLA-4-Targeted PET Imaging and Treatment of Metastatic Melanoma.

    Science.gov (United States)

    Beaino, Wissam; Nedrow, Jessie R; Anderson, Carolyn J

    2015-06-01

    Malignant melanoma is a highly aggressive cancer, and the incidence of this disease is increasing worldwide at an alarming rate. Despite advances in the treatment of melanoma, patients with metastatic disease still have a poor prognosis and low survival rate. New strategies, including targeted radiotherapy, would provide options for patients who become resistant to therapies such as BRAF inhibitors. Very late antigen-4 (VLA-4) is expressed on melanoma tumor cells in higher levels in more aggressive and metastatic disease and may provide an ideal target for drug delivery and targeted radiotherapy. In this study, we evaluated (177)Lu- and (68)Ga-labeled DOTA-PEG4-LLP2A as a VLA-4-targeted radiotherapeutic with a companion PET agent for diagnosis and monitoring metastatic melanoma treatment. DOTA-PEG4-LLP2A was synthesized by solid-phase synthesis. The affinity of (177)Lu- and (68)Ga-labeled DOTA-PEG4-LLP2A to VLA-4 was determined in B16F10 melanoma cells by saturation binding and competitive binding assays, respectively. Biodistribution of the LLP2A conjugates was determined in C57BL/6 mice bearing B16F10 subcutaneous tumors, while PET/CT imaging was performed in subcutaneous and metastatic models. (177)Lu-DOTA-PEG4-LLP2A showed high affinity to VLA-4 with a Kd of 4.1 ± 1.5 nM and demonstrated significant accumulation in the B16F10 melanoma tumor after 4 h (31.5 ± 7.8%ID/g). The tumor/blood ratio of (177)Lu-DOTA-PEG4-LLP2A was highest at 24 h (185 ± 26). PET imaging of metastatic melanoma with (68)Ga-DOTA-PEG4-LLP2A showed high uptake in sites of metastases and correlated with bioluminescence imaging of the tumors. These data demonstrate that (177)Lu-DOTA-PEG4-LLP2A has potential as a targeted therapeutic for treating melanoma as well as other VLA-4-expressing tumors. In addition, (68)Ga-DOTA-PEG4-LLP2A is a readily translatable companion PET tracer for imaging of metastatic melanoma.

  3. Upgrading nuclear regulatory infrastructure in Armenia

    International Nuclear Information System (INIS)

    Martirosyan, A.; Amirjanyan, A.; Kacenelenbogen, S.

    2010-01-01

    Armenia is contemplating an upgrade to its national power generation capacity to meet replacement and future energy needs. Unit 2 of ANPP is scheduled for shutdown after replacement power generation capacities are in place. A recent alternative energy study indicates viability of the nuclear option to replace this capacity. Some technology-specific proposals are being considered by the Ministry of Energy of Armenia. It is likely that the reactor technology decision will be made in the not too distant future. The existing reactor continues to be operated in the regulatory framework developed in the Soviet Union and adopted in Armenia. Given the interest in the new reactor, Armenia launched a project to review the existing system of regulation and to bring it into harmony with modern practice in preparation for the new reactor project development. The new regulatory framework will be needed as a basis for any potential tendering process. The US NRC and ANRA have agreed to perform a review and update nuclear legislation and the system of regulation in this area. The first step in this process was to develop an action plan for such program. The action plan describes the overall strategy of ANRA to modify existing or develop new processes and requirements, identifies the major Laws that need to be reviewed given practical legal considerations to construct and operate the reactor and Armenia's international obligations under various conventions. This work included review of existing models of regulation in different countries with 'small' nuclear program, including IAEA recommendations as well as existing legislation in Armenia in this area and development of a strategy for the regulatory model development. In addition, the plan to develop requirements for ANRA staffing and training needs to meet its regulatory obligations under the new reactor development process was developed

  4. The Upgrade to Hybrid Incubators in China

    DEFF Research Database (Denmark)

    Hu, Yimei; Gao, Yuchen

    countries and emerging economics. Based on a single in-depth case-study of Tuspark Incubator, this study explores key factors and specific ways for the upgrade to hybrid incubators in the context of China. By using categorical analysis, three factors, i.e. incubation subdivision, intermediary platform......, and proactive approach, are found to be essential for a formerly government-sponsored TBI’s upgrading. The result of this study also provides new insights and several implications for incubator managers and policy makers in emerging economies. In addition, whether the key factors can be used in upgrade of other...... TBIs in China requires further study....

  5. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  6. LHCb PID Upgrade Technical Design Report

    CERN Document Server

    LHCb Collaboration

    2013-01-01

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  7. The MAST data acquisition upgrade

    International Nuclear Information System (INIS)

    McArdle, G.J.; Shibaev, Sergei; Storrs, John; Thomas-Davies, Nigel; Stephen, Robert

    2010-01-01

    A programme has begun on MAST to replace its ageing CAMAC and VME based data acquisition systems with new modern hardware which, together with several improvements in the supporting infrastructure, will provide support for faster data acquisition rates, longer-pulse operation, faster data access and higher reliability. The main principle of the upgrade was to use commercial off-the-shelf (COTS) hardware and well-established standards wherever possible. CompactPCI or PXI was chosen as the digitiser form factor to replace CAMAC/VME, and Ethernet would be used as the means to access all devices. The modular architecture of the MAST data acquisition software framework has helped to minimise the integration effort required to phase in new subsystems and/or new technologies whilst continuing to use the old hardware in other systems. The software framework was updated to allow more versatile use of the network-attached data acquisition devices. The new data acquisition devices had multiple connector types, which created difficulties with the cable interfacing. To resolve this and provide support for easy substitution, a standard connector interface was chosen, based on the most common connector type and pin-out already in use, and several cable assemblies were produced to connect the proprietary interface of the digitiser to the standard interface block. The in-house IDA-3 data storage format is unable to accommodate the larger file sizes and is increasingly difficult to maintain, so it is to be gradually phased out. The NetCDF-4/HDF5 data standard is being adopted as its replacement, thus reducing in-house maintenance whilst providing a data format that is more accessible to the Fusion community. Several other infrastructure upgrades were necessitated by the anticipated increase in data traffic and volume including the Central Timing System, the MAST Ethernet infrastructure and servers for front-end data processing, data storage and data access management. These

  8. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  9. Securing budget for and implementing your significant simulator upgrade: The Fermi experience

    International Nuclear Information System (INIS)

    Crone, B.D.

    2006-01-01

    Detroit Edison has selected CAE to perform a total simulator upgrade (with the exception of the panel hardware and I/O system) of the Fermi 2 station simulator. The upgrade is intended to improve the performance of the simulator (and thus training effectiveness) while reducing associated operating costs by utilizing an industry standard operating platform, software applications, and off the shelf PC based computer hardware. Additionally, the upgrade is intended to provide the ability to conduct classroom presentations through the use of desktop simulators. Because the cost of a total upgrade is considerable, substantial work is necessary to convince site management that such an undertaking is necessary, can be performed efficiently, and that a return on investment is even possible. This effort was compounded by the lingering history of a previous simulator upgrade, which was completed considerably over-budget and beyond the intended Ready for Training date. As of this writing, the Fermi 2 Simulator Upgrade using CAE products is approximately 60% complete. This paper will describe the methods used to procure funding, as well as steps taken following funding approval to keep the project on track for successful completion. (author)

  10. ETA-II accelerator upgrades

    International Nuclear Information System (INIS)

    Nilson, D.G.; Deadrick, F.J.; Hibbs, S.M.; Sampayan, S.E.; Petersen, D.E.

    1991-09-01

    We discuss recent improvements to the ETA-II linear induction electron accelerator. The accelerator's cells have been carefully reconditioned to raise the maximum accelerating gap voltage from approximately 100 kV to 125 kV. Insulators of Rexolite plastic in a new ''zero-gap'' arrangement replaced the alumina originals after several alternative materials were investigated. A new multi-cable current feed system will be used to eliminate pulse reflection interactions encountered in earlier experiments. Improved alignment fixtures have been installed to help minimize beam perturbation due to poorly aligned intercell magnets between 10-cell groups. A stretched wire alignment technique (SWAT) has been utilized to enhance overall magnetic alignment, and to characterize irreducible alignment errors. These changes are in conjunction with an expansion of the accelerator from a 20-cell to a 60-cell configuration. When completed, the upgraded accelerator is expected to deliver 2.5 kA of electron beam current at 7.5 MeV in bursts of up to fifty 70-ns pulses at a 5-kHz repetition rate. A 5.5-meter-long wiggler will convert the energy into 3-GW microwave pulses at 140 GHz for plasma heating experiments in the Microwave Tokamak Experiment (MTX)

  11. Human-machine interface upgrade

    International Nuclear Information System (INIS)

    Kropik, M.; Matejka, K.; Sklenka, L.; Chab, V.

    2002-01-01

    The article describes a new human-machine interface that was installed at the VR-1 training reactor. The human-machine interface upgrade was completed in the summer 2001. The interface was designed with respect to functional, ergonomic and aesthetic requirements. The interface is based on a personal computer equipped with two displays. One display enables alphanumeric communication between the reactor operator and the nuclear reactor I and C. The second display is a graphical one. It presents the status of the reactor, principal parameters (as power, period), control rods positions, course of the reactor power. Furthermore, it is possible to set parameters, to show the active core configuration, to perform reactivity calculations, etc. The software for the new human-machine interface was produced with the InTouch developing tool of the Wonder-Ware Company. It is possible to switch the language of the interface between Czech and English because of many foreign students and visitors to the reactor. Microcomputer based communication units with proper software were developed to connect the new human-machine interface with the present reactor I and C. The new human-machine interface at the VR-1 training reactor improves the comfort and safety of the reactor utilisation, facilitates experiments and training, and provides better support for foreign visitors. (orig.)

  12. Disruption studies on ASDEX upgrade

    International Nuclear Information System (INIS)

    Pautasso, G.; Egorov, S.; Finken, K.H.

    2003-01-01

    Disruptions generate large thermal and mechanical stresses on the tokamak components and are occasionally responsible for damages to the machine. For a future reactor disruptions have a significant impact on the design since all loading conditions must be analyzed in accordance with stricter design criteria (due to safety or difficult maintenance). Therefore the uncertainties affecting the predicted stresses must be reduced as much as possible with a more comprehensive set of measurements and analyses in this generation of experimental machines, and avoidance/predictive methods must be developed further. Disruption studies on ASDEX Upgrade are focused on these subjects, namely on: (1) understanding the physical mechanisms leading to this phenomenon in order to learn to avoid it or to predict its occurrence and to mitigate its effects; (2) analyzing the effects of disruptions on the machine to determine the functional dependence of the thermal and mechanical loads upon the discharge parameters. This allows, firstly, to dimension or reinforce the machine components to withstand these loads and, secondly, to extrapolate them to tokamaks still in the design phase; (3) learning to mitigate the consequence of disruptions, i.e. thermal loads, mechanical forces and runaways with injection of impurity pellets or gas. This paper is focused on most recent results concerning points, i.e. on the analysis of the degree of asymmetry of the forces and on the use of impurity puff for mitigation

  13. Regime identification in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Giannone, L; Sips, A C C; Kardaun, O; Spreitler, F; Suttrop, W

    2004-01-01

    The ability to recognize the transition from the L-mode to the H-mode or from the H-mode to the improved H-mode reliably from a conveniently small number of measurements in real time is of increasing importance for machine control. Discriminant analysis has been applied to regime identification of plasma discharges in the ASDEX Upgrade tokamak. An observation consists of a set of plasma parameters averaged over a time slice in a discharge. The data set consists of all observations over different discharges and time slices. Discriminant analysis yields coefficients allowing the classification of a new observation. The results of a frequentist and a formal Bayesian approach to discriminant analysis are compared. With five plasma variables, a failure rate of 1.3% for predicting the L-mode and the H-mode confinement regime was achieved. With five plasma variables, a failure rate of 5.3% for predicting the H-mode and the improved H-mode confinement regime was achieved. The coefficients derived by discriminant analysis have been applied subsequently to discharges to illustrate the operation of regime identification in a real time control system

  14. Disruption studies in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Pautasso, G.

    2002-01-01

    Disruption generate large thermal and mechanical stresses on the tokamak components. For a future reactor disruptions have a significant impact on the design since all loading conditions must be analyzed in accordance with stricter design criteria (due to safety or difficult maintenance). Therefore the uncertainties affecting the predicted stresses must be reduced as much as possible with a more comprehensive set of measurements and analyses in this generation of experimental machines, and avoidance/ predictive methods must be developed further. The study of disruptions on ASDEX Upgrade is focused on these subjects, namely on: (1) understanding the physical mechanisms leading to this phenomenon and learning to avoid it or to predict its occurrence (with neural networks, for example) and to mitigate its effects; (2) analyzing the effects of disruptions on the machine to determine the functional dependence of the thermal and mechanical loads upon the discharge parameters. This allows to dimension or reinforce the machine components to withstand these loads and to extrapolate them to tokamaks still in the design phase; (3) learning to mitigate the consequence of disruptions. (author)

  15. Upgrading of PWR plant simulators

    International Nuclear Information System (INIS)

    Wada, Tomonori; Sasaki, Kazunori; Nakaishi, Hirokazu.

    1989-01-01

    For the education and training of operators in electric power plants, simulators have been employed, and it is well known that their effect is great. There are operation training simulators which simulate the dynamic characteristics of plants and all the machinery and equipment that operators handle, and train the procedure of restoration at the time of abnormality in plants, education simulators which can analyze the dynamic characteristics of plants efficiently in a short time, and offer information by visualizing phenomena with three-dimensional display and others so as to be easily understandable, and forecast simulators which do the analysis forecasting plant behavior at the time of abnormality in plants, and investigate the necessity of the guide for operation procedure and the countermeasures at the time of emergency. In this explanation, the upgrading of operation training simulators which have been put already in training is discussed. The constitution of simulator system and the instructor function, the outline of PWR plant simulation models comprising thermal flow model, pump model, leak model and so on, the techniques of increasing simulator speed, and the example of analysis using the NUPAC code are reported. (K.I.)

  16. The ATLAS SCT: Commissioning Experience and SLHC Upgrade

    OpenAIRE

    Mitrevski, J

    2008-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, ...

  17. Upgrade of the Los Alamos Plutonium Facility control system

    International Nuclear Information System (INIS)

    Pope, N.G.; Turner, W.J.; Brown, R.E.; Bibeau, R.A.; Davis, R.R.; Hogan, K.

    1996-01-01

    After 20 yrs service, the Los Alamos Plutonium Facility is undergoing an upgrade to its aging Facility Control System. The new system design includes a network of redundantly-paired programmable logic controllers that will interface with about 2200 field data points. The data communications network that has been designed includes a redundant, self-healing fiber optic data highway as well as a fiber optic ethernet. Commercially available human-machine interface software running on a UNIX-based system displays facility subsystem status operator X-terminals. Project design features, methods, costs, and schedule are discussed

  18. Upgrades to the Probabilistic NAS Platform Air Traffic Simulation Software

    Science.gov (United States)

    Hunter, George; Boisvert, Benjamin

    2013-01-01

    This document is the final report for the project entitled "Upgrades to the Probabilistic NAS Platform Air Traffic Simulation Software." This report consists of 17 sections which document the results of the several subtasks of this effort. The Probabilistic NAS Platform (PNP) is an air operations simulation platform developed and maintained by the Saab Sensis Corporation. The improvements made to the PNP simulation include the following: an airborne distributed separation assurance capability, a required time of arrival assignment and conformance capability, and a tactical and strategic weather avoidance capability.

  19. The CDF SVX II upgrade for the Tevatron Run II

    International Nuclear Information System (INIS)

    Bortoletto, Daniela

    1997-01-01

    A microstrip silicon detector SVX II has been proposed for the upgrade of CDF to be installed in 1999 for Run II of the Tevatron. Three barrels of five layers of double-sided silicon microstrip detectors will cover the interaction region. A description of the project status will be presented. Emphasis will be given to the R and D program for silicon sensors which includes capacitance minimization, the study of coupling capacitor integrity, the operation of the detectors in conjunction with the SVXH and SVX2 readout chips in two beam tests and the determination of the detectors performance deterioration due to radiation damage

  20. LHCb Upgraded RICH 2 Engineering Design Review Report

    CERN Document Server

    Garsed, Philip John; Cardinale, Roberta; Petrolini, Alessandro; Benettoni, Massimo; Simi, Gabriele; Zago, M; Easo, Sajan; D'Ambrosio, Carmelo; Frei, Christoph; He, Jibo; Piedigrossi, Didier

    2016-01-01

    During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.

  1. Scientific upgrades at the high flux isotope reactor at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Selby, D.L.; Garrett, D.L.; Lucas, A.T.; Reeves, M.E.

    2001-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the high flux isotope reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: 1) larger beam tubes, 2) a new monochromator drum for the HB-1 beam line, 3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, 4) new instruments for the HB-2 beamline, 5) a new monochromator drum for the HB-3 beam line, 6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, 7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, 8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, 9) a number of new instruments for the cold beams including two new SANS instruments, and 10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule. (orig.)

  2. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  3. Safety upgrades of NPPs in Slovakia

    International Nuclear Information System (INIS)

    Ziakova, M.

    2013-01-01

    In this presentation Mrs. Marta Ziakova (Chairperson od Nuclear Regulatory Authority of the Slovak Republic) deals with the safety upgrades of nuclear power plants and radioactive wastes technologies in the Slovak Republic. Safety improvement activities are reviewed.

  4. Upgrading Lebanese Economic Analytical Capacity | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Lebanon needs to upgrade its analytical capacity within key economic policy ... in contemporary approaches to current policy issues such as privatization, fiscal policy, ... IDRC “unpacks women's empowerment” at McGill University Conference.

  5. Backbone upgrades and DEC equipment replacement

    Science.gov (United States)

    Vancamp, Warren

    1991-01-01

    The NASA Science Internet (NSI) dual protocol backbone is outlined. It includes DECnet link upgrades to match TCP/IP link performance. It also includes the integration of backbone resources and central management. The phase 1 transition process is outlined.

  6. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  7. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  8. Upgrading of solid biofuels and feedstock quality

    Energy Technology Data Exchange (ETDEWEB)

    Burvall, Jan [Swedish Univ. of Agricultural Sciences, Umeaa (Sweden). Dept. of Agricultural Research for Northern Sweden

    1998-06-01

    This paper treats upgrading of biomass to pellets, briquettes and powder and the quality needed of the initial feedstock. The main raw materials are wood and reed canary grass (Phalaris arundinacea L.) 5 refs, 6 figs, 2 tabs

  9. Biogas Upgrading and Waste-to-Energy | Bioenergy | NREL

    Science.gov (United States)

    Biogas Upgrading and Waste-to-Energy Biogas Upgrading and Waste-to-Energy NREL's waste-to-energy research and development required for upgrading biogas to fuels and high-value co-products. Featured (2014) Biogas Potential in the United States, NREL Fact Sheet (2013) View all NREL biogas upgrading and

  10. Advantages of viscodampers for NPPs upgrading

    International Nuclear Information System (INIS)

    Reinsch, K.H.; Schwahn, K.J.; Podrouzek, J.

    1993-01-01

    Viscodampers GERB are the ideal components for seismic upgrading of flexible pipework systems of the existing operating NPPs, of WWER-440 type, namely in primary reactor part. There are cheap, maintenance-free, simple and their installation minimizes the support forces to the structures. The quoted attests are enclosed in this paper. The references for application on Bohunice NPP upgrading are positive, and they are used in Mochovce and Temelin NPP as well

  11. MAPS development for the ALICE ITS upgrade

    OpenAIRE

    Yang, P; Aglieri, G; Cavicchioli, C; Chalmet, P L; Chanlek, N; Collu, A; Gao, C; Hillemanns, H; Junique, A; Kofarago, M; Keil, M; Kugathasan, T; Kim, D; Kim, J; Lattuca, A

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging senso...

  12. High Flux Isotope Reactor power upgrade status

    International Nuclear Information System (INIS)

    Rothrock, R.B.; Hale, R.E.; Cheverton, R.D.

    1997-01-01

    A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions

  13. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  14. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  15. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  16. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  17. Injection septa position and angle optimisation in view of the 2 GeV liu upgrade of the CERN PS

    CERN Document Server

    Serluca, HM; Forte, V; Fraser, M; Sterbini, G

    2017-01-01

    In the framework of the LHC Injector Upgrade (LIU)project the CERN PS injection kinetic energy will be up-graded from 1.4 to 2 GeV. The injection equipment, whichis already operating close to its limit, is being redesigned tocope with 30% increase in the beam rigidity. In this paper wepresent the experimental results from Machine Development(MD) studies on the present septum to explore its operationalhardware limits with respect to aperture restrictions, beamlosses and kick strengths in view of the LIU upgrade

  18. The Advanced Light Source Upgrade

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2003-01-01

    The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented

  19. Design upgrading on Ignitor Machine

    International Nuclear Information System (INIS)

    Cucchiaro, A.; Coletti, A.; Bianchi, A.

    2006-01-01

    Ignitor is a high field compact machine conceived to achieve ignition in D-T plasma. The upgraded design of the Plasma Chamber (PC) and of the First Wall (FW) system consider the updated scenarios for IGNITOR vertical plasma disruption (VDE). The electromagnetic (EM) loads arising from halo currents and net horizontal force with the proper toroidal distribution have been envisaged. The dynamic elastic-plastic structural analysis of the PC has brought to a tayloring of the wall thickness such to reduce the displacements within the clearance with toroidal coil. A detailed 3D finite elements model has been developed in order to evaluate the electromagnetic loads on FW. The thermal loads arisen from plasma heat loads (peak value 1.8 MW/m 2 ) have been also considered. In any case the maximum calculated stresses are within the allowable limits. The relevant 3D virtual mockup software simulates the inside of the PC including the entire boom with end-effector. This allowed for the analysis of the boom kinematics to cover all positions with the various end-effectors to assess the Remote Handling task operations. The structural analysis of the IGNITOR machine Load Assembly has been performed taking into account the friction coefficients between the significant components. The non linear analysis takes into account for both the in-plane and the out-of-plane loads. The vertical plasma disruption conditions (VDE) result in bigger out-of-plane loads than the normal operating conditions. Keys of proper dimensions between the 30 o extension C-Clamps modules was adopted to assure structural stability. As far as the interlaminar shear stresses on toroidal field coils are concerned, the related safety factors are decreased respect to the normal operating conditions, but remaining around 2. (author)

  20. The ASDEX Upgrade Parameter Server

    Energy Technology Data Exchange (ETDEWEB)

    Neu, Gregor, E-mail: gregor.neu@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Gräter, Alex [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Lüddecke, Klaus [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Rapson, Christopher J.; Raupp, Gerhard; Treutterer, Wolfgang; Zasche, Dietrich; Zehetbauer, Thomas [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany)

    2015-10-15

    Highlights: • We describe our main tool in the plasma control configuration process. • Parameter access and computation are configurable with XML files. • Simple implementation of in situ tests by rerouting requests to test data. • Pulse specific overriding of parameters. - Abstract: Concepts for the configuration of plant systems and plasma control of modern devices such as ITER and W7-X are based on global data structures, or “pulse schedules” or “experiment programs”, which specify all physics characteristics (waveforms for controlled actuators and plasma quantities) and all technical characteristics of the plant systems (diagnostics and actuators operation settings) for a planned pulse. At ASDEX Upgrade we use different approach. We observed that the physics characteristics driving the discharge control system (DCS) are frequently modified on a pulse-to-pulse basis. Plant system operation, however, relies on technical standard settings, or “basic configurations” to provide guaranteed resources or services, which evolve according to longer term session or campaign operation schedules. This is why AUG manages technical configuration items separately from physics items. Consistent computation of the DCS configuration requires access to all this physics and technical data, which include the discharge programme (DP), settings of actuator systems and real-time diagnostics, the current system state and a database of static parameters. A Parameter Server provides a unified view on all these parameter sets and acts as the central point of access. We describe the functionality and architecture of the Parameter Server and its embedding into the control environment.

  1. a Look at Nitrile Chemistry in SGR B2(N) Using the Combined Power of the GBT and the VLA

    Science.gov (United States)

    Steber, Amanda; Zaleski, Daniel P.; Seifert, Nathan A.; Neill, Justin; Muckle, Matt; Pate, Brooks; Corby, Joanna F.; Remijan, Anthony

    2014-06-01

    Nitriles form the most prolific family of molecules known in the ISM, and laboratory work shows that radical-driven chemistry can account for the formation of a diverse set of nitrile and imine molecules. Broadband reaction screening of nitrile chemistry in a pulsed discharge nozzle coupled to a chirped-pulse Fourier transform rotational spectrometer has enabled detections of several new interstellar species including E- and Z-ethanimine and E-cyanomethanimine. The detections were made by direct comparisons of laboratory broadband rotational spectra with the Robert C. Byrd Green Bank Telescope (GBT) PRebiotic Interstellar MOlecule Survery (PRIMOS) survey towards Sgr B2(N), the most chemically complex interstellar region known. In order to probe nitrile chemistry in Sgr B2, we targeted low energy rotational transitions in the 18-21 GHz range of several nitriles with the Karl G. Jansky Very Large Array (VLA) at ˜1 arcsecond resolution. The data indicate that most nitriles and nitrile derivatives are co-spatial with shell shaped continuum features thought to be expanding ionization fronts. The CH2CN radical and imine species in particular are NOT associated with the hot core known as the "Large Molecule Heimat", where most large organic molecules are thought to reside. This result suggests radical driven nitrile chemistry may be promoted by near-UV radiation in moderate density regions of molecular clouds, and the data will be useful for evaluating possible formation mechanisms. R.A. Loomis et al. Ap. J. L., 765, (L9), 2013. D.P. Zaleski et al. Ap. J. L., 765, (L10), 2013.

  2. A combined multiwavelength VLA/ALMA/Chandra study unveils the complex magnetosphere of the B-type star HR5907

    Science.gov (United States)

    Leto, P.; Trigilio, C.; Oskinova, L. M.; Ignace, R.; Buemi, C. S.; Umana, G.; Ingallinera, A.; Leone, F.; Phillips, N. M.; Agliozzo, C.; Todt, H.; Cerrigone, L.

    2018-05-01

    We present new radio/millimeter measurements of the hot magnetic star HR 5907 obtained with the VLA and ALMA interferometers. We find that HR 5907 is the most radio luminous early type star in the cm-mm band among those presently known. Its multi-wavelength radio light curves are strongly variable with an amplitude that increases with radio frequency. The radio emission can be explained by the populations of the non-thermal electrons accelerated in the current sheets on the outer border of the magnetosphere of this fast-rotating magnetic star. We classify HR 5907 as another member of the growing class of strongly magnetic fast-rotating hot stars where the gyro-synchrotron emission mechanism efficiently operates in their magnetospheres. The new radio observations of HR 5907 are combined with archival X-ray data to study the physical condition of its magnetosphere. The X-ray spectra of HR 5907 show tentative evidence for the presence of non-thermal spectral component. We suggest that non-thermal X-rays originate a stellar X-ray aurora due to streams of non-thermal electrons impacting on the stellar surface. Taking advantage of the relation between the spectral indices of the X-ray power-law spectrum and the non-thermal electron energy distributions, we perform 3-D modelling of the radio emission for HR 5907. The wavelength-dependent radio light curves probe magnetospheric layers at different heights above the stellar surface. A detailed comparison between simulated and observed radio light curves leads us to conclude that the stellar magnetic field of HR 5907 is likely non-dipolar, providing further indirect evidence of the complex magnetic field topology of HR 5907.

  3. New Hubble Servicing Mission to upgrade instruments

    Science.gov (United States)

    2006-10-01

    The history of the NASA/ESA Hubble Space Telescope is dominated by the familiar sharp images and amazing discoveries that have had an unprecedented scientific impact on our view of the world and our understanding of the universe. Nevertheless, such important contributions to science and humankind have only been possible as result of regular upgrades and enhancements to Hubble’s instrumentation. Using the Space Shuttle for this fifth Servicing Mission underlines the important role that astronauts have played and continue to play in increasing the Space Telescope’s lifespan and scientific power. Since the loss of Columbia in 2003, the Shuttle has been successfully launched on three missions, confirming that improvements made to it have established the required high level of safety for the spacecraft and its crew. “There is never going to be an end to the science that we can do with a machine like Hubble”, says David Southwood, ESA’s Director of Science. “Hubble is our way of exploring our origins. Everyone should be proud that there is a European element to it and that we all are part of its success at some level.” This Servicing Mission will not just ensure that Hubble can function for perhaps as much as another ten years; it will also increase its capabilities significantly in key areas. This highly visible mission is expected to take place in 2008 and will feature several space walks. As part of the upgrade, two new scientific instruments will be installed: the Cosmic Origins Spectrograph and Wide Field Camera 3. Each has advanced technology sensors that will dramatically improve Hubble’s potential for discovery and enable it to observe faint light from the youngest stars and galaxies in the universe. With such an astounding increase in its science capabilities, this orbital observatory will continue to penetrate the most distant regions of outer space and reveal breathtaking phenomena. “Today, Hubble is producing more science than ever before in

  4. Heavy crude oils - From Geology to Upgrading - An Overview

    International Nuclear Information System (INIS)

    Huc, A.Y.

    2010-01-01

    and Production. 5. Reservoir Geology. 6. Oil Sands: Mining and Processing. 7. Cold Production. 8. Enhanced Recovery. 9. Heavy Oil Production: Pumping Systems. 10. Examples of Large Heavy Oil Projects. Part 3. Surface Transport. 11. Heavy Oil dilution. 12. Aqueous Emulsions. 13. Core Annular Flow. 14. Surface Pumps for Transport: Selection and Limitations. Part 4. Upgrading. 15. De-asphalting with Heavy Paraffinic Solvents. 16. Vis-breaking. 17. Coking. 18. Catalytic Hydrotreatment and Hydro-conversion: Fixed Bed, Moving Bed, Ebullated Bed and Entrained Bed. Part 5. Environmental Issues. 19. Reservoir and Production. 20. Upgrading. 21. Greenhouse Gas Emissions. 22. CO 2 Mass Balance: and Integrated Approach. Part 6. Ongoing Technological Challenges. 23. In Situ Upgrading of Heavy Oil and Bitumen. 24. Process Work-flows. Conclusion. Abbreviations. Glossary. Nomenclature

  5. Bohunice V-1. Review of safety upgrading and operating experiences

    International Nuclear Information System (INIS)

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  6. Control and data acquisition upgrades for NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.M., E-mail: bdavis@pppl.gov; Tchilinguirian, G.J., E-mail: gtchilin@pppl.gov; Carroll, T., E-mail: tcarroll@pppl.gov; Erickson, K.G., E-mail: kerickson@pppl.gov; Gerhardt, S.P., E-mail: sgerhardt@pppl.gov; Henderson, P., E-mail: phenderson@pppl.gov; Kampel, S.H., E-mail: skampel@pppl.gov; Sichta, P., E-mail: psichta@pppl.gov; Zimmer, G.N., E-mail: gzimmer@pppl.gov

    2016-11-15

    Highlights: • The NSTX-U upgrade is nearing completion, and various control and data acquisition upgrades are needed. • The Digital Coil Protection System is a major addition which provides hardware and software to protect the magnetic coils from the complex, increased, stresses added from the upgrade. • The increased computational requirements for the upgrade have largely followed Moore’s Law, and enhancements to the infrastructure and computer hardware should maintain or exceed the previous functionality. • Data requirements for Fast 2-D cameras have exceeded those of “conventional” time-varying signals. There has been a particular emphasis and increase in data from IR cameras. - Abstract: The extensive NSTX Upgrade (NSTX-U) Project includes major components which allow a doubling of the toroidal field strength to 1 T, of the Neutral Beam heating power to 12 MW, and the plasma current to 2 MA, and substantial structural enhancements to withstand the increased electromagnetic loads. The maximum pulse length will go from 1.5 to 5 s. The larger and more complex forces on the coils will be protected by a Digital Coil Protection System, which requires demanding real-time data input rates, calculations and responses. The amount of conventional digitized data for a given pulse is expected to increase from 2.5 to 5 GB per second of pulse. 2-D Fast Camera data is expected to go from 2.5 GB/pulse to 10, and another 2 GB/pulse is expected from new IR cameras. Our network capacity will be increased by a factor of 10, with 10 Gb/s fibers used for the major trunks. 32-core Linux systems will be used for several functions, including between-shot data processing, MDSplus data serving, between-shot EFIT analysis, real-time processing, and for a new capability, between-shot TRANSP. Improvements to the MDSplus events subsystem will be made through the use of both UDP and TCP/IP based methods and the addition of a dedicated “event server”.

  7. Upgrades, Current Capabilities and Near-Term Plans of the NASA ARC Mars Climate

    Science.gov (United States)

    Hollingsworth, J. L.; Kahre, Melinda April; Haberle, Robert M.; Schaeffer, James R.

    2012-01-01

    We describe and review recent upgrades to the ARC Mars climate modeling framework, in particular, with regards to physical parameterizations (i.e., testing, implementation, modularization and documentation); the current climate modeling capabilities; selected research topics regarding current/past climates; and then, our near-term plans related to the NASA ARC Mars general circulation modeling (GCM) project.

  8. Soft ware upgrade for Mobile Laboratories in Estonia, Latvia and Lithuania

    DEFF Research Database (Denmark)

    Bargholz, Kim; Andersen, Frank

    1998-01-01

    In July-August 1998 the soft ware for controlling the measurements in the mobile laboratories have been upgraded. The mobile laboratories are sponsored by Danish east aid projects in cooperation with Rotaray Denmark.The equipment used is 4 L NaI(Tl) detectors mounted on the roof of the cars toget...

  9. Electrocatalytic upgrading of biomass pyrolysis oils to chemical and fuel

    Science.gov (United States)

    Lam, Chun Ho

    The present project's aim is to liquefy biomass through fast pyrolysis and then upgrade the resulting "bio-oil" to renewable fuels and chemicals by intensifying its energy content using electricity. This choice reflects three points: (a) Liquid hydrocarbons are and will long be the most practical fuels and chemical feedstocks because of their energy density (both mass and volume basis), their stability and relative ease of handling, and the well-established infrastructure for their processing, distribution and use; (b) In the U.S., the total carbon content of annually harvestable, non-food biomass is significantly less than that in a year's petroleum usage, so retention of plant-captured carbon is a priority; and (c) Modern technologies for conversion of sunlight into usable energy forms---specifically, electrical power---are already an order of magnitude more efficient than plants are at storing solar energy in chemical form. Biomass fast pyrolysis (BFP) generates flammable gases, char, and "bio-oil", a viscous, corrosive, and highly oxygenated liquid consisting of large amounts of acetic acid and water together with hundreds of other organic compounds. With essentially the same energy density as biomass and a tendency to polymerize, this material cannot practically be stored or transported long distances. It must be upgraded by dehydration, deoxygenation, and hydrogenation to make it both chemically and energetically compatible with modern vehicles and fuels. Thus, this project seeks to develop low cost, general, scalable, robust electrocatalytic methods for reduction of bio-oil into fuels and chemicals.

  10. 400 MeV upgrade for the Fermilab linac

    International Nuclear Information System (INIS)

    MacLachlan, J.A.

    1989-01-01

    Fermilab has plans for a comprehensive accelerator upgrade to open new possibilities for both the fixed target and collider experimental programs. An early step in this program is to increase the energy of the linac from 200 to 400 MeV by replacing the last four of its nine 201 MHz Alvarez tanks with twenty-eight 805 MHz side-coupled cavity chains operating at about 8 MV/m average axial field. The principal purpose is to reduce the incoherent spacecharge tuneshift at injection into the Booster which currently limits both the brightness of the beam, an important determinant of collider luminosity, and total intensity to produce both the antiprotons for the collider and the beams to fixed target experimental areas. Other consequences of higher Booster injection energy expected to contribute to some degree of higher intensity limits and improved operational characteristics include improved quality of the guide field at injection, reduced frequency swing for the rf systems, and smaller emittance for the injected beam. The linac upgrade project has moved from a 1986 study through a development project including structure models and numerical studies to a full-feature module prototyping starting this year

  11. Overview of ASDEX Upgrade results

    Science.gov (United States)

    A. Kallenbachthe ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-10-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were designed for a reduction of tungsten release during ICRF operation. As predicted, a factor two reduction on the ICRF-induced W plasma content could be achieved by the reduction of the sheath voltage at the antenna limiters via the compensation of the image currents of the central and side straps in the antenna frame. There are two main operational scenario lines in AUG. Experiments with low collisionality, which comprise current drive, ELM mitigation/suppression and fast ion physics, are mainly done with freshly boronized walls to reduce the tungsten influx at these high edge temperature conditions. Full ELM suppression and non-inductive operation up to a plasma current of {{I}\\text{p}}=0.8 MA could be obtained at low plasma density. Plasma exhaust is studied under conditions of high neutral divertor pressure and separatrix electron density, where a fresh boronization is not required. Substantial progress could be achieved for the understanding of the confinement degradation by strong D puffing and the improvement with nitrogen or carbon seeding. Inward/outward shifts of the electron density profile relative to the temperature profile effect the edge stability via the pressure profile changes and lead to improved/decreased pedestal performance. Seeding and D gas puffing are found to effect the core fueling via changes in a region of high density on the high field side (HFSHD). The integration of all above mentioned operational scenarios will be feasible and naturally obtained in a large device where the edge is more opaque for neutrals and higher plasma temperatures provide a lower collisionality. The combination of exhaust control with pellet fueling has been successfully

  12. Upgrading of Gasification Gases by means of a Catalytic Membrane Reactor: WGS Catalysts and Inorganic Palladium Membranes HENRECA Project (ENE2004-07758-CO2-01). Final Report; Estudios de Enriquecimiento en H{sub 2} de Gases de Gasificacion mediante el Uso Reactor Catalitico de Membranas: Catalizadores WGS y Membranas Inorganicas de Paladio. Informe Final Proyecto HENRECA (ENE2004-07758-C02-01)

    Energy Technology Data Exchange (ETDEWEB)

    Maranon Bujan, M.; Sanchez Hervas, J. M.; Barreiro Carou, M. del

    2008-07-01

    The combination of a CO catalytic converter with a highly hydrogen selective membrane out stands as a very promising technology for the upgrading of biomass gasification gases. The advantages of this combined system over the traditional two stages WGS technology has been investigated within the HENRECA project, financed under the Spanish PN 2004-2007 of the Ministry of Science and Technology. This project started in September 2004 and had a duration of three years. The Division of Combustion and Gasification of CIEMAT participates in this project in three main activities: the study of the catalytic activity of WGS catalysts synthesised by the other partner of the project (University Rey Juan Carlos), the design of the reaction-separation system and the design and construction of a bench-scale pilot plant where the performance of the membranes prepared by URJC and the catalytic membrane system were investigated. This report describes the activities carried out within the project and the main results obtained. (Author) 14 ref.

  13. Upgrading Probability via Fractions of Events

    Directory of Open Access Journals (Sweden)

    Frič Roman

    2016-08-01

    Full Text Available The influence of “Grundbegriffe” by A. N. Kolmogorov (published in 1933 on education in the area of probability and its impact on research in stochastics cannot be overestimated. We would like to point out three aspects of the classical probability theory “calling for” an upgrade: (i classical random events are black-and-white (Boolean; (ii classical random variables do not model quantum phenomena; (iii basic maps (probability measures and observables { dual maps to random variables have very different “mathematical nature”. Accordingly, we propose an upgraded probability theory based on Łukasiewicz operations (multivalued logic on events, elementary category theory, and covering the classical probability theory as a special case. The upgrade can be compared to replacing calculations with integers by calculations with rational (and real numbers. Namely, to avoid the three objections, we embed the classical (Boolean random events (represented by the f0; 1g-valued indicator functions of sets into upgraded random events (represented by measurable {0; 1}-valued functions, the minimal domain of probability containing “fractions” of classical random events, and we upgrade the notions of probability measure and random variable.

  14. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  15. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  16. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  17. Experience in the upgrading of radioactive waste disposal facility 'Ekores'

    International Nuclear Information System (INIS)

    Rozdyalovskaya, L.

    2000-01-01

    The national Belarus radioactive disposal facility 'Ekores' is designed for waste from nuclear applications in industry, medicine and research. Currently 12-20 tons of waste and over 6000 various types spent sources annually come to the 'Ekores'. Total activity in the vaults is evaluated as 352.8 TBq. Approximately 150 000 spent sources disposed of in the vaults and wells have total activity about 1327 TBq. In 1997 the Government initiated a project for the facility reconstruction in order to upgrade radiological safety of the site by creating adequate safety conditions for managing and storage of the waste. The reconstruction project developed by Belarus specialists has been reviewed by IAEA experts. This covers modernising technologies for new coming waste and also that the waste currently disposed in the pits is retrieved, sorted and treated in the same way as the new coming waste

  18. Timing and control monitor system upgrade design document. Version 4

    International Nuclear Information System (INIS)

    Brandt, J.J.

    1984-01-01

    This is a design document for the Timing and Control Monitor System Upgrade Project. This project is intended to provide a replacement system for the existing user Encoder Monitor Systems and Varian 72 Control Room computer systems. All of these systems reside at the Nevada Test Site. The function of the T and C Monitor System is to gather real-time statistics and data on user defined key variables from control, communication, data acquistion systems, and from the monitoring system itself. The control, communication, and data acquisition systems each operate separately from the monitor system. The T and C Monitor System gathers this data in order to verify the readiness of an event to begin countdown. This includes setup, verification, calibration, and peripheral services, report any failures that may occur during the countdown, verify detonation and containment, and assist reentry activities after the event

  19. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  20. Microbial biocatalyst developments to upgrade fossil fuels.

    Science.gov (United States)

    Kilbane, John J

    2006-06-01

    Steady increases in the average sulfur content of petroleum and stricter environmental regulations concerning the sulfur content have promoted studies of bioprocessing to upgrade fossil fuels. Bioprocesses can potentially provide a solution to the need for improved and expanded fuel upgrading worldwide, because bioprocesses for fuel upgrading do not require hydrogen and produce far less carbon dioxide than thermochemical processes. Recent advances have demonstrated that biodesulfurization is capable of removing sulfur from hydrotreated diesel to yield a product with an ultra-low sulfur concentration that meets current environmental regulations. However, the technology has not yet progressed beyond laboratory-scale testing, as more efficient biocatalysts are needed. Genetic studies to obtain improved biocatalysts for the selective removal of sulfur and nitrogen from petroleum provide the focus of current research efforts.

  1. Status of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.; Rutherford, B.

    1992-01-01

    Certain components of the ATLAS control system are two generations behind today's technology. It has been decided to upgrade the control system. in part, by replacing Digital Equipment Corporation (DEC) PDP-11 computers with present-day VAX technology. Two primary goals have been defined for the upgraded control system. The first of these goals is to keep additional ''in-house'' written software to a minimum, while providing the portability necessary to ensure the continued use of existing software. In an attempt to achieve this goal, commercially-available software has been utilized to provide a foundation for the final control-system configuration. The second goal is to develop the new control system, while not interfering with accelerator operations. This paper describes some of the motivation for upgrading the ATLAS control system, the basic features of the new control system, and the present status of the system's development

  2. LHC Interaction Region Upgrade Phase I

    CERN Document Server

    Ostojic, R

    2009-01-01

    The LHC is starting operation with beam in 2008. The primary goal of CERN and the LHC community is to ensure that the collider is operated efficiently, maximizing its physics reach, and to achieve the nominal performance in the shortest term. Since several years the community has been discussing the directions for upgrading the experiments, in particular ATLAS and CMS, the LHC machine and the CERN proton injector complex. A well substantiated and coherent scenario for the first phase of the upgrade, which is foreseen in 2013, is now approved by CERN Council. In this paper, we present the goals and the proposed conceptual solution for the Phase-I upgrade of the LHC interaction regions. This phase relies on the mature Nb-Ti superconducting magnet technology, with the target of increasing the luminosity by a factor of 2-3 with respect to the nominal luminosity of 1034 cm-2s-1, while maximising the use of the existing infrastructure.

  3. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    A new survey shows that the economy is what motivates Danish owners of single-family houses the most to start energy upgrading, and that improved indoor climate is also an important factor. After the upgrading, homeowners experience both improved economy and indoor climate. In a strategy...... to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...... them to choose relevant energy-saving solutions as well as clarifying the financial consequences and opportunities....

  4. Tackling Chinese Upgrading through Experimentalism and Pragmatism

    DEFF Research Database (Denmark)

    Kirkegaard, Julia Kirch

    2017-01-01

    This paper examines the development of China’s wind turbine industry, shedding light on the Chinese mode of disruptive industrial upgrading through policy pragmatism and fragmented, experimental governance. Based on a historical analysis of China’s wind turbine industry, the paper highlights three...... distinct phases, which are all marked by their own inbuilt and potentially self-disruptive impasses and associated crises. In turn, these impasses have forced the Chinese government into radical and flexible interventions, which have spurred on Chinese companies to creatively find new ways to develop...... and upgrade. The paper illustrates the transformation of Sino–foreign relations by China’s non-linear upgrading approach, particularly during the Chinese wind power industry’s quality crisis, and its development model. It also discusses the implications this examination of China’s approach has...

  5. Upgrades and expansion of the Cornell High Energy Synchrotron Source (CHESS)

    International Nuclear Information System (INIS)

    White, Jeffrey A.

    2000-01-01

    The Cornell High Energy Synchrotron Source (CHESS) is a user-oriented National Facility that provides state-of-the-art synchrotron radiation facilities to scientists worldwide. With major new funding in 1999, we now have 5 ongoing upgrade and expansion projects: 1) a new building addition that will house a new wiggler beamline (CHESS G-line) with three new experimental stations; 2) a new more powerful wiggler source for both A and G beamlines; 3) an upgrade to the A-line optics for better heat load handling and focussing; 4) a rebuild of the F-cave optics room with new optics to handle higher machine current; and 5) a renovation to the user laboratory space surrounding the F1 and F2 crystallography stations. We expect these upgrades and a new G line Cornell faculty collaborating group to raise the level of excitement and productivity at CHESS for many years to come

  6. Paloma co-op rehabilitation case study examining the challenges to energy upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Legge, C.; Schwartz, J. [JRS Enginerring LTd., Burnaby, (Canada)

    2010-07-01

    Paloma Cooperative consists of two wood-frame multi-unit residential buildings located in the Commercial Drive area of Vancouver, British Columbia. In 2006, investigations showed that the balconies were severely deteriorated due to water ingress. The complex was deemed to have suffered from a premature building failure. A complete building envelope remediation was necessary. This paper presented the challenges of incorporating energy efficient and sustainable design upgrades during a rehabilitation project, using the Paloma Cooperative as a case study. The various design options, the technical limitations, the financial analysis, the modelling assumptions and the involvement of third party lenders were presented. Initial air-leakage rates were measured and an energy modeling was completed using RETScreen software. Three scenarios were modeled to determine what effect different energy upgrades would have on the energy savings. This paper showed that cost was the biggest challenge faced by the Paloma Cooperative energy upgrade.

  7. Laser performance upgrade for precise ICF experiment in SG-Ⅲ laser facility

    Directory of Open Access Journals (Sweden)

    Wanguo Zheng

    2017-09-01

    Full Text Available The SG-Ⅲ laser facility (SG-Ⅲ is the largest laser driver for inertial confinement fusion (ICF researches in China, which has 48 beamlines and can deliver 180 kJ ultraviolet laser energy in 3 ns. In order to meet the requirements of precise physics experiments, some new functionalities need to be added to SG-Ⅲ and some intrinsic laser performances need upgrade. So at the end of SG-Ⅲ's engineering construction, the 2-year laser performance upgrade project started. This paper will introduce the newly added functionalities and the latest laser performance of SG-Ⅲ. With these function extensions and performance upgrade, SG-Ⅲ is now fully prepared for precise ICF experiments and solidly paves the way towards fusion ignition.

  8. Use of ultrasound in petroleum residue upgradation

    Energy Technology Data Exchange (ETDEWEB)

    Sawarkar, A.N.; Pandit, A.B.; Samant, S.D.; Joshi, J.B. [Mumbai Univ., Mumbai (India). Inst. of Chemical Technology

    2009-06-15

    The importance of bottom-of-the barrel upgrading has increased in the current petroleum refining scenario because of the progressively heavier nature of crude oil. Heavy residues contain large concentrations of metals such as vanadium and nickel which foul catalysts and reduce the potential effect of residue fluidized catalytic cracking. This study showed that the cavitational energy induced by ultrasound be be successfully used to upgrade hydrocarbon mixtures. Conventional processes for the upgrading of residual feedstocks, such as thermal cracking and catalytic cracking, were carried out in the temperature range of 400-520 degrees C. Experiments were performed on 2 vacuum residues, Arabian mix vacuum residue (AMVR) and Bombay high vacuum residue (BHVR) and 1 Haldia asphalt (HA). These were subjected to acoustic cavitation for different reaction times from 15 to 120 minutes at ambient temperature and pressure. Two acoustic cavitation devices were compared, namely the ultrasonic bath and ultrasonic horn. In particular, this study compared the ability of these 2 devices to upgrade the petroleum residues to lighter, more value-added products. Different surfactants were used to examine the effect of ultrasound on upgrading the residue when emulsified in water. In order to better understand the reaction mechanism, a kinetic model was developed based on the constituents of the residue. The ultrasonic horn was found to be more effective in bringing about the upgrading than ultrasonic bath. The study also showed that the acoustic cavitation of the aqueous emulsified hydrocarbon mixture could reduce the asphaltenes content to a greater extent than the acoustic cavitation of non-emulsified hydrocarbon mixture. 20 refs., 11 tabs., 17 figs.

  9. ngVLA Key Science Goal 4: Using Pulsars in the Galactic Center as Fundamental Tests of Gravity

    Science.gov (United States)

    Bower, Geoffrey C.; Chatterjee, Shami; Cordes, James; Demorest, Paul; Dexter, Jason; Kramer, Michael; Lazio, Joseph; Ransom, Scott; Wharton, Robert; ngVLA Science Working Group 4

    2018-01-01

    monitor pulsars. The ngVLA with its enhanced sensitivity at radio frequencies between 10 and 30 GHz will be unique in its capability to open a new door for the study of pulsars in the GC.

  10. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  11. Take control of upgrading to Snow Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Installing a major new version of Mac OS X should be exciting and fun, but without proper guidance you may find it nerve-wracking or even risk losing valuable files. Fortunately, many thousands of people have upgraded Mac OS X calmly and successfully with Joe Kissell's previous best-selling Take Control of Upgrading... titles. Joe's friendly, expert steps-developed over innumerable test installations-help you to avoid trouble, understand what's going on when you install Snow Leopard, and easily recover from problem

  12. Do we really need a collimator upgrade?

    International Nuclear Information System (INIS)

    Redaelli, S.

    2012-01-01

    Several improvements are foreseen for the LHC collimation system during the LS1 and beyond. The changes are matched to the required performance reach during the HL-LHC era. The scenarios for system upgrades are determined based on the present operational experience with the operation at 3.5 TeV, well about the beam stored energy regime of 100 MJ. The present upgrade strategy, and the uncertainties on the performance extrapolation to 7 TeV are presented. The collimation activities in LS1 are outlined and the possible works for LS2 and LS3 are presented. (author)

  13. The LANSCE RICE control system upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Oothoudt, Michael; Schaller, S. (Stuart); Bjorklund, E. A. (Eric A.); Burns, M. J. (Mary J.); Carr, G. (Gary); Carr, G. (Gary); Faucett, John Allen,; Hayden, D. J. (David J.); Lusk, M. D. (Matthew D.); Merl, R. B. (Robert B.); Potter, J. M. (Jerry M.); Reynolds, J. A. (Jerome A.); Romero, D. B. (Dolores B.); Shelley, F. E. (Fred E.)

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  14. The LANSCE RICE control system upgrade

    International Nuclear Information System (INIS)

    Oothoudt, Michael; Schaller, S.; Bjorklund, E.A.; Burns, M.J.; Carr, G.; Faucett, John Allen; Hayden, D.J.; Lusk, M.D.; Merl, R.B.; Potter, J.M.; Reynolds, J.A.; Romero, D.B.; Shelley, F.E.

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  15. CMS Calorimeter Trigger Phase I upgrade

    International Nuclear Information System (INIS)

    Klabbers, P; Gorski, T; Bachtis, M; Dasu, S; Fobes, R; Grothe, M; Ross, I; Smith, W H; Compton, K; Farmahini-Farahani, A; Gregerson, A; Seemuth, D; Schulte, M

    2012-01-01

    We present a design for the Phase-1 upgrade of the Compact Muon Solenoid (CMS) calorimeter trigger system composed of FPGAs and Multi-GBit/sec links that adhere to the μTCA crate Telecom standard. The upgrade calorimeter trigger will implement algorithms that create collections of isolated and non-isolated electromagnetic objects, isolated and non-isolated tau objects and jet objects. The algorithms are organized in several steps with progressive data reduction. These include a particle cluster finder that reconstructs overlapping clusters of 2x2 calorimeter towers and applies electron identification, a cluster overlap filter, particle isolation determination, jet reconstruction, particle separation and sorting.

  16. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  17. The Fermilab 400-MeV Linac Upgrade

    International Nuclear Information System (INIS)

    Schmidt, C.W.

    1993-05-01

    The Fermilab Linac Upgrade will increase the linac energy from 201 MeV to 401.5 MeV. Seven accelerating modules, composed of 805-MHz side-coupled cells, will accelerate H - beams from 116.5 to 401.5 MeV. The side-coupled structure (SCS) has been built, tuned, tested to full power, and placed in the linac enclosure along side the operating Linac. All seven accelerating modules, each containing four sections of sixteen cells, have been connected to 12-MW power klystrons and tested to full power for a significant period. The transition section to match the beam from the 201.25-MHz drift-tube linac to the SCS, consisting of a sixteen-cell cavity and a vernier four-cell cavity, has also been tested at full power. A new import line from the Linac to the Booster synchrotron with a new Booster injection girder is to be installed. Removal of the last four Alvarez linac tanks (116.5 to 201 MeV) and beam-line installation of the Upgrade components is to begin in early June 1993 and should take about 12 weeks. Beam commissioning of the project will follow and normal operation is expected in a short period. In preparation for beam commissioning, studies are being done with done operating linac to characterize the beam at transition and prepare for phase, amplitude and energy measurements to commission the new linac. The past, present and future activities of the 400-MeV Upgrade will be reviewed

  18. Targeted blockade in lethal West Nile virus encephalitis indicates a crucial role for very late antigen (VLA-4-dependent recruitment of nitric oxide-producing macrophages

    Directory of Open Access Journals (Sweden)

    Getts Daniel R

    2012-10-01

    Full Text Available Abstract Infiltration of Ly6Chi monocytes from the blood is a hallmark of viral encephalitis. In mice with lethal encephalitis caused by West Nile virus (WNV, an emerging neurotropic flavivirus, inhibition of Ly6Chi monocyte trafficking into the brain by anti-very late antigen (VLA-4 integrin antibody blockade at the time of first weight loss and leukocyte influx resulted in long-term survival of up to 60% of infected mice, with subsequent sterilizing immunity. This treatment had no effect on viral titers but appeared to be due to inhibition of Ly6Chi macrophage immigration. Although macrophages isolated from the infected brain induced WNV-specific CD4+ T-cell proliferation, T cells did not directly contribute to pathology, but are likely to be important in viral control, as antibody-mediated T-cell depletion could not reproduce the therapeutic benefit of anti-VLA-4. Instead, 70% of infiltrating inflammatory monocyte-derived macrophages were found to be making nitric oxide (NO. Furthermore, aminoguanidine-mediated inhibition of induced NO synthase activity in infiltrating macrophages significantly prolonged survival, indicating involvement of NO in the immunopathology. These data show for the first time the therapeutic effects of temporally targeting pathogenic NO-producing macrophages during neurotropic viral encephalitis.

  19. ASDEX-UG. ASDEX upgrade project proposal. Phase 2

    International Nuclear Information System (INIS)

    1983-05-01

    The objective of ASDEX UG is to investigate the problems relating to tokamak divertor physics and the boundary layer of hot plasmas which cannot be covered otherwise by either ASDEX or other EUROPEAN tokamaks, including JET, but whose investigation is indispensable for NET and INTOR. The configuration of ASDEX UG is changed as compared with ASDEX due to the requirement that all poloidal field coils are located outside the toroidal field magnet. This leads to a highly elongated D-shaped plasma with an ''open'' divertor, which does not allow to close the divertor chamber by such simple means as in ASDEX. In section 2, the aims of ASDEX UG are repeated briefly and the essential features and parameters of the tokamak system are summarized. The summary includes an overview of the tokamak design, the time schedule of design and construction concluding with the estimated investment cost and manpower required. In section 3 the tokamak system components are treated. The circuits and energy supply for the different electrical components are described in section 4. Auxiliary heating requirements and methods are discussed in section 5. Section 6 presents a survey over the periphery of the tokamak system including preparation of the building and radiation shielding. Section 7 outlines the physical programme. Section 8 is devoted to diagnostics. Finally, the principal concepts for control, data acquisition and handling are outlined in section 9. (orig./AH)

  20. EDF Contribution to the Mochovce completion and safety upgrading project

    International Nuclear Information System (INIS)

    Norvez, G.

    1997-01-01

    The challenge that SE a.s. took up in April 1996 to start Mochovce units 1 and 2 within a very demanding time frame and in satisfactory conditions is on the way to being wined. EMO managed to put in place an organisation able to ensure the continuity of the design and construction works and to integrate the requirements of modern safety. EDF is proud and happy to contribute to this effort by making available its expertise and experience in building and operating nuclear power plants. The success of Mochovce will not only contribute to the Slovak electricity needs coverage, but will be the first demonstration of a soviet design nuclear power plant brought to international safety standards. (author)