WorldWideScience

Sample records for view system retrofit

  1. Retrofitting Systems

    DEFF Research Database (Denmark)

    Rose, Jørgen

    1997-01-01

    This report gives an overview of the different retrofitting possibilities that are available today. The report looks at both external and internal systems for external wall constructions, roof constructions, floor constructions and foundations. All systems are described in detail in respect to use...... and methods, and the efficiency of the different systems are discussed....

  2. Retrofitting Systems for External Walls

    DEFF Research Database (Denmark)

    Rose, Jørgen

    1997-01-01

    In this report, 9 different external and internal retrofitting systems are analyzed using numerical calculations. The analysis focuses on the thermal bridge effects in the different systems, and on this basis it is discussed whether internal or external retrofitting has the most advantages...

  3. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  4. Review of retrofit strategies decision system in historic perspective

    Directory of Open Access Journals (Sweden)

    M. D. Bostenaru Dan

    2004-01-01

    Full Text Available Urban development is a process. In structuring and developing its phases different actors are implied, who act under different, sometimes opposite, dynamic conditions and within different reference systems. This paper aims to explore the contribution of participatism to disaster mitigation, when this concerns earthquake impact on urban settlements, through the support provided to multi-criteria decision in matters of retrofit. The research broadness in field of decision making on one side and the lack of a specific model for the retrofit of existing buildings on another side led to an extensive review of the state of the art in related models to address the issue. Core idea in the selection of existing models has been the preoccupation for collaborative issues, in other words, the consideration for the different actors implied in the planning process. The historic perspective on participative planning models is made from the view of two generations of citizen implication. The first approaches focus on the participation of the building owner/inhabitant in the planning process of building construction. As current strategies building rehabilitation and selection from alternative retrofit strategies are presented. New developments include innovative models using the internet or spatial databases. The investigated participation approaches show, that participation and communication as a more comprehensive term are an old topic in the field politics-democratisation-urbanism. In all cases it can be talked of 'successful learning processes', of the improvement of the level of the professional debate. More than 30 years history of participation marked a transition in understanding the concept: from participation, based on a central decision process leading to a solution controlled and steered by the political-administrative system, to communication, characterised by simultaneous decision processes taking place outside politics and administration in co

  5. CRNL research reactor retrofit Emergency Filtration System

    International Nuclear Information System (INIS)

    Philippi, H.M.

    1990-01-01

    This paper presents a brief history of NRX and NRU research reactor effluent air treatment systems before describing the selection and design of an appropriate retrofit Emergency Filtration System (EFS) to serve these reactors and the future MX-10 isotope production reactor. The conceptual design of the EFS began in 1984. A standby concrete shielding filter-adsorber system, sized to serve the reactor with the largest exhaust flow, was selected. The standby system, bypassed under normal operating conditions, is equipped with normal exhaust stream shutoff and diversion valves to be activated manually when an emergency is anticipated, or automatically when emergency levels of gamma radiation are detected in the exhaust stream. The first phase of the EFS installation, that is the construction of the EFS and the connection of NRU to the system, was completed in 1987. The second phase of construction, which includes the connection of NRX and provisions for the future connection of MX-10, is to be completed in 1990

  6. Retrofit of safety and control systems in nuclear power plants

    International Nuclear Information System (INIS)

    Keiper, J.T.; Fassett, G.B.

    1986-01-01

    The modularity, compactness, compatibility, and licensability of the microcontrol system make it a cost-effective approach to obtain the benefits of digital control technology in the retrofit of nuclear power plants. Retrofit of individual loops or complete systems can be scheduled to meet the operational needs of the plant. The existing racks, panels, and cable systems can be utilized to the maximum extent to minimize the installed cost. Future expansion to total plant control or plant management is supported by the network communication module or gateway. The microcontrol module provides benefits now in improved operation, and future benefits in planned, controlled upgrading

  7. Increasing draft capability for retrofit flue gas desulfurization systems

    International Nuclear Information System (INIS)

    Petersen, R.D.; Basel, B.E.; Mosier, R.J.

    1992-01-01

    The retrofit installation of flue gas desulfurization (FGD) systems results in significantly higher draft losses for existing generating stations. Consequently, the means for increasing draft capability must be included in many FGD retrofit projects. Consideration is given to several alternatives for increasing draft capability. Alternatives are developed for new induced draft (ID) fans to replace the existing ID fans and for new booster fans to supplement the existing ID fans. Both centrifugal and axial fans are evaluated, as are different means of fan volume control. Each alternative is evaluated on the basis of technical merit and economics. Presented are the development of fan alternatives and results of the technical and economic evaluations

  8. Thermo economical evaluation of retrofitting strategies in air conditioning systems

    Energy Technology Data Exchange (ETDEWEB)

    Tribess, Arlindo; Fiorelli, Flavio Augusto Sanzogo; Hernandez Neto, Alberto [Sao Paulo Univ., SP (Brazil). Escola Politecnica. Dept. de Engenharia Mecanica]. E-mail: atribess@usp.br; fiorelli@usp.br; ahneto@usp.br

    2000-07-01

    In a building project, several subsystems are designed, among them the air conditioning system. Electrical energy consumption profiles show that this subsystem is responsible for 40 to 50% of total consumption in a commercial building. Besides the study of technical aspects that should be considered in order to assure the thermal comfort of the occupants as well the temperature and humidity conditions for an efficient equipment operation, an economical evaluation of this subsystem should be also made. In retrofit projects, the economical aspect is also critical for such projects in order to assure bigger efficiency in an economically attractive way. This paper analyses some strategies that might be adopted in retrofitting an air conditioning system installed in a commercial building with mixed occupation. By mixed we mean that some floors have a typical office occupation profile and other floors are mainly occupied by electronic equipment. This analysis includes both technical and economical evaluation. The proposed solutions performance are compared to the old system, which allows to verify the retrofitting impact in energy consumption reduction and its economical feasibility. (author)

  9. Retrofitting a fine-pointing system to satellite optics

    Energy Technology Data Exchange (ETDEWEB)

    Woods, R.O.

    1994-12-31

    This paper describe a system that was added to an existing satellite-borne telescope design for the purpose of compensating the boresight errors that had been observed in earlier flights of similar instruments. Those errors had been found to be caused by thermal distortion of the spaceframe. This retrofit design was subject to severe volume restrictions because it was fitted into an already tightly-packaged instrument envelope. It was found practical to improve the basic design by converting a redundant structure into a statically-determinate one. It was also possible to use portions of the mechanical actuation system to facilitate the position encoding needed for computer interfacing.

  10. Retrofit of radwaste solidification systems in Spain

    International Nuclear Information System (INIS)

    Rorcillo, R.; Virzi, E.

    1983-01-01

    In order to meet current Spanish engineering criteria as well as to provide for likely future Spanish Regulatory requirements, utilities committed to a major policy change in the preferred radwaste solidification media. In the early 1970's Spanish utilities, following the United States experience, purchased inexpensive solidification systems which used urea formaldehyde (UF) as the binding matrix. By the late 1970's the Spanish utilities, seeing the deterioration of the UF position and slow progress toward its improvement, unilaterally changed their binding matrix to cement. This paper illustrates the implementation of this change at the ASCO Nuclear Plant. The problems of layout modifications, shortened delivery schedule and criteria unique for Spain are addressed. Also presented is the operating experience acquired during the pre-operational start-up of the ASCO I Radwaste System

  11. Case study field evaluation of a systems approach to retrofitting a residential HVAC system

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Iain S.; McWiliams, Jennifer A.; Konopacki, Steven J.

    2003-09-01

    This case study focusing on a residence in northern California was undertaken as a demonstration of the potential of a systems approach to HVAC retrofits. The systems approach means that other retrofits that can affect the HVAC system are also considered. For example, added building envelope insulation reduces building loads so that smaller capacity HVAC system can be used. Secondly, we wanted to examine the practical issues and interactions with contractors and code officials required to accomplish the systems approach because it represents a departure from current practice. We identified problems in the processes of communication and installation of the retrofit that led to compromises in the final energy efficiency of the HVAC system. These issues must be overcome in order for HVAC retrofits to deliver the increased performance that they promise. The experience gained in this case study was used to optimize best practices guidelines for contractors (Walker 2003) that include building diagnostics and checklists as tools to assist in ensuring the energy efficiency of ''house as a system'' HVAC retrofits. The best practices guidelines proved to be an excellent tool for evaluating the eight existing homes in this study, and we received positive feedback from many potential users who reviewed and used them. In addition, we were able to substantially improve the energy efficiency of the retrofitted case study house by adding envelope insulation, a more efficient furnace and air conditioner, an economizer and by reducing duct leakage.

  12. School Retrofit Design Analysis System. A Microcomputer Model for School Energy Use.

    Science.gov (United States)

    Canipe, Stephen Lee

    The School Retrofit Design Analysis System (SRDAS) developed in this study provides a non-technical method for the school administrator to use in evaluating alternative energy saving retrofit and new construction design possibilities. By providing a high degree of flexibility, SRDAS is applicable to a wide range of school building and retrofit…

  13. Performance of school bus retrofit systems: ultrafine particles and other vehicular pollutants.

    Science.gov (United States)

    Zhang, Qunfang; Zhu, Yifang

    2011-08-01

    This study evaluated the performance of retrofit systems for diesel-powered school buses, a diesel oxidation catalyst (DOC) muffler and a spiracle crankcase filtration system (CFS), regarding ultrafine particles (UFPs) and other air pollutants from tailpipe emissions and inside bus cabins. Tailpipe emissions and in-cabin air pollutant levels were measured before and after retrofitting when the buses were idling and during actual pick-up/drop off routes. Retrofit systems significantly reduced tailpipe emissions with a reduction of 20-94% of total particles with both DOC and CFS installed. However, no unequivocal decrease was observed for in-cabin air pollutants after retrofitting. The AC/fan unit and the surrounding air pollutant concentrations played more important roles for determining the in-cabin air quality of school buses than did retrofit technologies. Although current retrofit systems reduce children's exposure while waiting to board at a bus station, retrofitting by itself does not protect children satisfactorily from in-cabin particle exposures. Turning on the bus engine increased in-cabin UFP levels significantly only when the wind blew from the bus' tailpipe toward its hood with its windows open. This indicated that wind direction and window position are significant factors determining how much self-released tailpipe emissions may penetrate into the bus cabin. The use of an air purifier was found to remove in-cabin particles by up to 50% which might be an alternative short-to-medium term strategy to protect children's health.

  14. Evaluation of retrofitting gas-fired cooling and heating systems into BCHP using design optimization

    International Nuclear Information System (INIS)

    Cao Jiacong

    2009-01-01

    The influence of energy prices on the feasibility of a retrofit is investigated. The retrofit describes the conversion of a system from HVAC to BCHP for energy-saving. This includes two optimal retrofit design models, of which the exergetic efficiency and annual costs (AC) are the separate objective functions. The retrofit scheme is planned to insert gas engines as prime movers into the original system, which have adopted gas-fired absorption chillers. The solutions of the optimizations show that such a retrofit can result in a remarkable rise in exergetic efficiency but is not viable with current energy prices. The contradictory solutions reveal a gap between the current energy prices system of the country and the present energy situation. Further investigation gives the critical lines of which each divides the coordinate plane of natural gas-electric prices into two parts of benefit and deficit. If the electric price rises to a certain extent, the retrofit will be advantageous both in benefit and energy-saving. So it is really an urgent task to reform the energy prices system in China. Conclusions may be helpful for other similar retrofit projects, and for legislators and the government which are responsible for improving the energy market in China.

  15. Effects of Retrofitting on the Operation and Deployment of Technologies within a Decentralized System

    OpenAIRE

    Saad Hussein, N.; Senkpiel, C.; Hollander, M. den

    2016-01-01

    The effects of retrofitting of buildings on the energy system configuration have up to date not been examined thoroughly. Currently, most studies analyze the direct effect on the energy saving potential or the economic benefits for home owners, rather than the system effects. In this analysis, an evaluation of the effects of the different KFW standards of building retrofitting on a decentralized system is carried out. The main focus of the analysis is to evaluate the effect on the technology ...

  16. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: NEW CONDENSATOR, INC.--THE CONDENSATOR DIESEL ENGINE RETROFIT CRANKCASE VENTILATION SYSTEM

    Science.gov (United States)

    EPA's Environmental Technology Verification Program has tested New Condensator Inc.'s Condensator Diesel Engine Retrofit Crankcase Ventilation System. Brake specific fuel consumption (BSFC), the ratio of engine fuel consumption to the engine power output, was evaluated for engine...

  17. Retrofit of new digital control systems in existing power stations

    International Nuclear Information System (INIS)

    Smith, J.E.; Baird, C.F.

    1986-01-01

    With the notable exception of the Canadian CANDU nuclear power stations, little use has been made of digital control in North American nuclear stations. Recently, however, there has been renewed interest in such systems within the nuclear industry in response to demands for better ergonomics in control room design and the obsolescence of control equipment whose fundamental design has changed little in 20 yr. Early in 1985, Atomic Energy of Canada Limited was asked by New Brunswick Power to advise on the redesign of the control systems for two fossil-fired generating stations, Coleson Cove and Courtenay Bay Unit 4. Coleson Cove is to be converted from oil to coal firing with consequent extensive control system changes and Courtenay Bay Unit 4 required a low-cost solution to the problem of relocating its control room from the existing isolated location to the combined control center used by units 1, 2, and 3. In both cases, the recommended solution involves the retrofit of state-of-the-art digital control systems. Although the units involved are nonnuclear the experience is applicable

  18. Decision process for the retrofit of municipal buildings with solar energy systems: a technical guide

    Energy Technology Data Exchange (ETDEWEB)

    Licciardello, Michael R.; Wood, Brian; Dozier, Warner; Braly, Mark; Yates, Alan

    1980-11-01

    As a background for solar applications, the following topics are covered: solar systems and components for retrofit installations; cost, performance, and quality considerations; and financing alternatives for local government. The retrofit decision process is discussed as follows: pre-screening of buildings, building data requirements, the energy conservation audit, solar system sizing and economics, comparison of alternatives, and implementation. Sample studies are presented for the West Valley Animal Shelter and the Hollywood Police Station. (MHR)

  19. Testing of modular industrial solar retrofit industrial process steam systems

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.

    1984-06-13

    Under the Department of Energy's Modular Industrial Solar Retrofit project, five industrial process heat systems incorporating line-focus solar collectors were designed and hardware was installed and tested at Sandia National Laboratories and the Solar Energy Research Institute. System designers and collector manufacturers participating in the project included Acurex Solar Corporation, BDM, Inc., Custom Engineering, Inc., Foster Wheeler Solar Development Corporation, Solar Kinetics, Inc., and Suntec Systems, Inc. This paper describes the testing of the qualification test systems which has been under way since mid-1982. Each qualification test system includes an equipment skid sufficient to support a collector field of 2300 m/sup 2/ aperture and one delta-tempeature string of from 175 to 460 m/sup 2/ aperture. Each system is capable of producing saturated steam at 1.7 MPa and operates at maximum outlet temperatures of from 250 to 290/sup 0/C. The test series includes function and safety tests to determine that the systems operate as specified, an unattended operation test of at least two weeks duration, performance tests to allow prediction of annual system performance, and life cycle tests to evaluate component lifetime and maintenance requirements. Since the start of testing, some twenty five modifications have been made to the various systems for the purpose of improving system performance and/or reliability, and appropriate tests of these modifictions have been made or are underway. This paper presents a description of the approach to testing of the MISR systems and selected test results.

  20. Retrofit SCR system for NOx control from heavy-duty mining equipment

    International Nuclear Information System (INIS)

    Mannan, M.A.

    2009-01-01

    Diesel engines are used extensively in the mining industry and offer many advantages. However, particulate matter (PM) emissions and nitrogen oxide emissions (NOx) are among its disadvantages. A significant concern related to PM and NOx in an underground mine involves the use of diesel exhaust after treatment systems such as diesel particulate filters and selective catalytic reduction (SCR). This presentation discussed NOx and PM control and provided a description of an SCR system and examples of SCR retrofits. Options for NOx control were discussed and a case study involving the installation of an SCR retrofit system in an underground mine operated by Sifto Salt was also presented. The purpose of the case study was to identify cost effective retrofit solutions to lower nitrogen dioxide emissions from heavy-duty trucks operating in underground mines. The case study illustrated and presented the candidate vehicle, baseline emissions, a BlueMax SCR retrofit solution, and BlueMax installation. 1 tab., 6 figs.

  1. Multiobjective optimisation of energy systems and building envelope retrofit in a residential community

    International Nuclear Information System (INIS)

    Wu, Raphael; Mavromatidis, Georgios; Orehounig, Kristina; Carmeliet, Jan

    2017-01-01

    Highlights: • Simultaneous optimisation of building envelope retrofit and energy systems. • Retrofit and energy systems change interact and should be considered simultaneously. • Case study quantifies cost-GHG emission tradeoffs for different retrofit options. - Abstract: In this paper, a method for a multi-objective and simultaneous optimisation of building energy systems and retrofit is presented. Tailored to be suitable for the diverse range of existing buildings in terms of age, size, and use, it combines dynamic energy demand simulation to explore individual retrofit scenarios with an energy hub optimisation. Implemented as an epsilon-constrained mixed integer linear program (MILP), the optimisation matches envelope retrofit with renewable and high efficiency energy supply technologies such as biomass boilers, heat pumps, photovoltaic and solar thermal panels to minimise life cycle cost and greenhouse gas (GHG) emissions. Due to its multi-objective, integrated assessment of building transformation options and its ability to capture both individual building characteristics and trends within a neighbourhood, this method is aimed to provide developers, neighbourhood and town policy makers with the necessary information to make adequate decisions. Our method is deployed in a case study of typical residential buildings in the Swiss village of Zernez, simulating energy demands in EnergyPlus and solving the optimisation problem with CPLEX. Although common trade-offs in energy system and retrofit choice can be observed, optimisation results suggest that the diversity in building age and size leads to optimal strategies for retrofitting and building system solutions, which are specific to different categories. With this method, GHG emissions of the entire community can be reduced by up to 76% at a cost increase of 3% compared to the current emission levels, if an optimised solution is selected for each building category.

  2. Solar repowering/industrial retrofit systems study: Gulf Mt. Taylor Uranium Mill solar retrofit. Final technical report

    International Nuclear Information System (INIS)

    1980-06-01

    This report covers the efforts in a nine month study to develop a site-specific conceptual design for solar industrial process heat retrofit of the Gulf Mt. Taylor Uranium Mill. This has resulted in preparation of a System Requirements Specification, conduct of trade studies leading to selection of a system concept, and conceptual design, performance, cost estimating and economic analysis of the selected concept. A baseline system with no storage and an alternative system with extended storage were evaluated. The baseline system with no storage was selected because it provides the best overall opportunity for fuel displacement, operating experience in industrial application and successful demonstration in the near term for both DOE and the user

  3. Marginal costs of water savings from cooling system retrofits: a case study for Texas power plants

    Science.gov (United States)

    Loew, Aviva; Jaramillo, Paulina; Zhai, Haibo

    2016-10-01

    The water demands of power plant cooling systems may strain water supply and make power generation vulnerable to water scarcity. Cooling systems range in their rates of water use, capital investment, and annual costs. Using Texas as a case study, we examined the cost of retrofitting existing coal and natural gas combined-cycle (NGCC) power plants with alternative cooling systems, either wet recirculating towers or air-cooled condensers for dry cooling. We applied a power plant assessment tool to model existing power plants in terms of their key plant attributes and site-specific meteorological conditions and then estimated operation characteristics of retrofitted plants and retrofit costs. We determined the anticipated annual reductions in water withdrawals and the cost-per-gallon of water saved by retrofits in both deterministic and probabilistic forms. The results demonstrate that replacing once-through cooling at coal-fired power plants with wet recirculating towers has the lowest cost per reduced water withdrawals, on average. The average marginal cost of water withdrawal savings for dry-cooling retrofits at coal-fired plants is approximately 0.68 cents per gallon, while the marginal recirculating retrofit cost is 0.008 cents per gallon. For NGCC plants, the average marginal costs of water withdrawal savings for dry-cooling and recirculating towers are 1.78 and 0.037 cents per gallon, respectively.

  4. Whole Foods Market Retrofits Multiple Building Systems for Big Savings

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    Whole Foods Market partnered with U.S. the Department of Energy (DOE) to develop and implement solutions to reduce annual energy consumption in existing stores by at least 30% versus pre-retrofit energy use at its store in Edgewater, New Jersey, as part of DOE’s Commercial Building Partnership (CBP) program.

  5. Seismic retrofit system for single leaf masonry buildings in Groningen

    NARCIS (Netherlands)

    Türkmen, Ö.S.; Vermeltfoort, A.T.; Martens, D.R.W.

    2016-01-01

    Due to recent seismic activity in the Netherlands, the demand of adequate strengthening and retrofitting techniques increased, especially for single leaf masonry. Two Dutch companies founded in the re-gion have initiated an experimental program to study the applicability of existing stand-alone

  6. Retrofitting the instrumentation and control system of primary cooling circuit from TRIGA INR 14 MW reactor

    International Nuclear Information System (INIS)

    Preda, M.; Ciocanescu, M.; Ana, E. M.; Cristea, D.

    2008-01-01

    Activities of retrofitting the instrumentation and control system from TRIGA INR primary cooling circuit consists in replacement of actual system for: - parameter measurement; - safety; - reactor external scramming; - protection, command and supply for electrical elements of the system. This retrofitting project is designed to ensure the necessary features of reactor external safety and for technological parameter measurement. The new safety system of main cooling circuit is completely separated from its operating system and is arranged in a panel assembly in reactor control room. The operating system has the following features: - data acquisition; - parameter value and state of command elements displaying; - command elements on hierarchical levels; - operator information through visual and acoustic alarm. (authors)

  7. Evaluating an Exterior Insulation and Finish System for Deep Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, Jordan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Podorson, David [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-01-01

    Exterior insulation and finish systems (EIFS) are proprietary synthetic formulations that are applied to the exterior walls of buildings to serve as insulation and exterior cladding. The insulation thickness can vary from less than one inch to a foot or more. In this project the applicability of EIFS for residential deep energy retrofits was investigated through modeling and a case study home. The home was retrofitted using a site-applied four-inch-thick EIFS. Site-specific details were developed as required for the residential retrofit application. Site work and the costs of the EIFS system were documented. The demonstration home was modeled using Building Energy Optimization energy and cost analysis software to explore cost effectiveness of various EIFS insulation thicknesses in two climate locations.

  8. Comparative feasibility study on retrofitting ballast water treatment system for a bulk carrier.

    Science.gov (United States)

    Jee, Jaehoon; Lee, Sangick

    2017-06-30

    Use of ballast water in ships causes harmful effects on marine environment accompanied by economic loss and negative impact on ecosystem and human health. To solve these problems, the international convention on ballast water management will take into force in September 2017. In this study, a comprehensive feasibility of retrofitting the ballast water treatment system for an ocean-going bulk carrier was conducted. The technologies involved, installation and operational aspects of direct flow and side stream electrolysis, UV, and ozone type BWTS are described in detail. The principal concept of each BWTS is explained and probable arrangements of retrofitting in engine room are suggested. The cost analysis is carried out for retrofitting 4 types of BWTS onboard the target ship by examining each processes of installation and operation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Retrofit MHB Hamm. Process-related optimization of the combustion air system MHB Hamm; Retrofit MHB Hamm. Prozess- und verfahrenstechnische Optimierung des Verbrennungsluftsystems MHB Hamm

    Energy Technology Data Exchange (ETDEWEB)

    Schumacher, Frank [SC Schumacher Consulting handelnd fuer Xervon Energy GmbH, Ritterhude (Germany); Lindke, Carsten [MHB Hamm Betriebsfuehrungsgesellschaft mbH, Hamm (Germany); Auel, Werner [Xervon Energy GmbH, Duisburg (Germany)

    2012-11-01

    The authors of the contribution under consideration report on a process-related optimization of the combustion air system of the waste incinerator Hamm. Subsequently to the historical aspects of this waste incinerator and the development of its calorific values, the authors describe the tender Retrofit, its implementation as well as the first practical experiences.

  10. Solar Energy: System Sizing, Design, and Retrofit: Student Material. First Edition.

    Science.gov (United States)

    Younger, Charles; Orsak, Charles G., Jr.

    Designed for student use in "System Sizing, Design, and Retrofit," one of 11 courses in a 2-year associate degree program in solar technology, this manual provides readings, exercises, worksheets, bibliographies, and illustrations for 13 course modules. The manual, which corresponds to an instructor guide for the same course, covers the…

  11. A graphics subsystem retrofit design for the bladed-disk data acquisition system. M.S. Thesis

    Science.gov (United States)

    Carney, R. R.

    1983-01-01

    A graphics subsystem retrofit design for the turbojet blade vibration data acquisition system is presented. The graphics subsystem will operate in two modes permitting the system operator to view blade vibrations on an oscilloscope type of display. The first mode is a real-time mode that displays only gross blade characteristics, such as maximum deflections and standing waves. This mode is used to aid the operator in determining when to collect detailed blade vibration data. The second mode of operation is a post-processing mode that will animate the actual blade vibrations using the detailed data collected on an earlier data collection run. The operator can vary the rate of payback to view differring characteristics of blade vibrations. The heart of the graphics subsystem is a modified version of AMD's ""super sixteen'' computer, called the graphics preprocessor computer (GPC). This computer is based on AMD's 2900 series of bit-slice components.

  12. Retrofit of existing Dow solidification system at quad cities nuclear station

    International Nuclear Information System (INIS)

    Dekitis, L.; Jarvis, N.; Petri, R.; Testa, J.

    1983-01-01

    Over the past year ATCOR has been involved in the design, testing and supply of an In-container Mixing System Retrofit for Commonwealth Edison's Quad Cities Nuclear Station Solidification System. The system supplied by DOW, itself a retrofit of a urea formaldehyde system, was based upon use of 50 cubic foot containers (liners). ATCOR's retrofit increased liner capacity to 170 cubic feet and allowed in-cask solidification of highly radioactive material. This paper discusses the reasons for the decision to replace equipment within the originally furnished system and the development of the ATCOR plan to proof-test this equipment prior to delivery at the site. Results of this pre-testing, and a comparison between pre-tested conditions and the actual in-plan start-up tests are presented. Development of improved instrumentation and mechanical modifications which enhance the reliability of the ATCOR/DOW process In-container Mixing System was provided as a part of this project. Test results are presented on instruments, controls and the unique method of mechanical attachment of the Mixing Head to the solidification container

  13. Characterization of systems for external insulation and retrofitting with emphasis on the thermal performance

    DEFF Research Database (Denmark)

    Rudbeck, Claus; Rose, Jørgen

    1999-01-01

    During the last decade retrofitting of buildings has received increased attention not only in northern Europe but throughout the world. Retrofitting of buildings is usually performed to solve one or more of the following problems: poor indoor climate, excessive heat losses, insufficient durability...... a building designer with such a choice, key parameters for insulation systems are described in a uniform manner stating their performance with regards to aesthetics, heat transfer, moisture, durability, fire and economy. Parameters given for the total insulation capability enable the building designer...... to include the effect of thermal bridges by performing simple calculations, a task which normally requires the use of numerical models. The results show that thermal bridges in external insulation systems may decrease their thermal resistance by more than 25%.Key parameters was calculated by the use...

  14. Description and characterization of systems for external insulation and retrofitting for Denmark with emphasis on the thermal performance

    DEFF Research Database (Denmark)

    Rudbeck, Claus Christian; Svendsen, Sv Aa Højgaard

    1998-01-01

    Lately there has been quite a large focus on retrofitting of the Danish buildings. The retrofitting of the building is done in order to solve one or more of the following problems: bad indoor climate, large use of energy for heating, insufficient durability or architectural unsatisfactory.In order...... to solve these problems insulation is often part of the retrofitting. As internal insulation has many disadvantages with regards to heat and moisture only systems for external insulation will be mentioned here.As there are several different systems for external insulation, each with different properties......, there is a need for a systematic approach when the building designer chooses which system should be used on the building which is to be retrofitted....

  15. Retrofitting Combined Space and Water Heating Systems: Laboratory Tests

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, B.; Bohac, D.; Huelman, P.; Olson, R.; Hewitt, M.

    2012-10-01

    Better insulated and tighter homes can often use a single heating plant for both space and domestic water heating. These systems, called dual integrated appliances (DIA) or combination systems, can operate at high efficiency and eliminate combustion safety issues associated by using a condensing, sealed combustion heating plant. Funds were received to install 400 DIAs in Minnesota low-income homes. The NorthernSTAR DIA laboratory was created to identify proper system components, designs, operating parameters, and installation procedures to assure high efficiency of field installed systems. Tests verified that heating loads up to 57,000 Btu/hr can be achieved with acceptable return water temperatures and supply air temperatures.

  16. Retrofitting Combined Space and Water Heating Systems. Laboratory Tests

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, B. [NorthernStar Building America Partnership, St. Paul, MN (United States); Bohac, D. [NorthernStar Building America Partnership, St. Paul, MN (United States); Huelman, P. [NorthernStar Building America Partnership, St. Paul, MN (United States); Olsen, R. [NorthernStar Building America Partnership, St. Paul, MN (United States); Hewett, M. [NorthernStar Building America Partnership, St. Paul, MN (United States)

    2012-10-01

    Better insulated and tighter homes can often use a single heating plant for both space and domestic water heating. These systems, called dual integrated appliances (DIA) or combination systems, can operate at high efficiency and eliminate combustion safety issues associated by using a condensing, sealed combustion heating plant. Funds were received to install 400 DIAs in Minnesota low-income homes. The NorthernSTAR DIA laboratory was created to identify proper system components, designs, operating parameters, and installation procedures to assure high efficiency of field installed systems. Tests verified that heating loads up to 57,000 Btu/hr can be achieved with acceptable return water temperatures and supply air temperatures.

  17. Retrofitting Trojan Nuclear Plant's spent resin transfer system

    International Nuclear Information System (INIS)

    Pierce, R.E.

    1979-01-01

    The spent resin slurry transport system at the Trojan Nuclear Plant operated by Portland General Electric Company is one of the most advanced systems of its type in the nuclear industry today. The new system affords the plant's operators safe remote sonic indication for spent resin and cover water levels, manual remote dewatering and watering capability to establish desirable resin-to-water volumetric ratios, reliable non-mechanical resin agitation utilizing fixed spargers, and controllable process flow utilizing a variable speed recessed impeller pump

  18. Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, Ben [NorthernSTAR, St. Paul, MN (United States); Bohac, Dave [NorthernSTAR, St. Paul, MN (United States); McAlpine, Jack [NorthernSTAR, St. Paul, MN (United States); Hewett, Martha [NorthernSTAR, St. Paul, MN (United States)

    2017-06-01

    This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called "combi" systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loads for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.

  19. Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, Ben [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Bohac, Dave [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; McAlpine, Jake [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Hewett, Martha [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership

    2017-06-23

    This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called 'combi' systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loads for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.

  20. Modified traditional Japanese timber joint system with retrofitting abilities

    NARCIS (Netherlands)

    Shiratori, T.; Komatsu, K.; Leijten, A.J.M.

    2008-01-01

    Embedment is a key feature of timber joints envisioned as the ultimate solution in avoiding the devastating full collapse of timber structures in seismic countries. The Japanese traditional timber post-and-beam structural system utilizes moment-resisting joints based on embedment. Despite the

  1. Performance evaluation of a retrofit digital detector-based mammography system.

    Science.gov (United States)

    Marshall, Nicholas W; van Ongeval, Chantal; Bosmans, Hilde

    2016-02-01

    A retrofit flat panel detector was integrated with a GE DMR+ analog mammography system and characterized using detective quantum efficiency (DQE). Technical system performance was evaluated using the European Guidelines protocol, followed by a limited evaluation of clinical image quality for 20 cases using image quality criteria in the European Guidelines. Optimal anode/filter selections were established using signal difference-to-noise ratio measurements. Only small differences in peak DQE were seen between the three anode/filter settings, with an average value of 0.53. For poly(methyl methacrylate) (PMMA) thicknesses above 60 mm, the Rh/Rh setting was the optimal anode/filter setting. The system required a mean glandular dose of 0.54 mGy at 30 kV Rh/Rh to reach the Acceptable gold thickness limit for 0.1 mm details. Imaging performance of the retrofit unit with the GE DMR+ is notably better than of powder based computed radiography systems and is comparable to current flat panel FFDM systems. Copyright © 2016 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  2. Simulation Models to Size and Retrofit District Heating Systems

    Directory of Open Access Journals (Sweden)

    Kevin Sartor

    2017-12-01

    Full Text Available District heating networks are considered as convenient systems to supply heat to consumers while reducing CO 2 emissions and increasing renewable energies use. However, to make them as profitable as possible, they have to be developed, operated and sized carefully. In order to cope with these objectives, simulation tools are required to analyze several configuration schemes and control methods. Indeed, the most common problems are heat losses, the electric pump consumption and the peak heat demand while ensuring the comfort of the users. In this contribution, a dynamic simulation model of all the components of the network is described. It is dedicated to assess some energetic, environmental and economic indicators. Finally, the methodology is used on an existing application test case namely the district heating network of the University of Liège to study the pump control and minimize the district heating network heat losses.

  3. Retrofitting a spent fuel pool spray system for alternative cooling as a strategy for beyond design basis events

    Energy Technology Data Exchange (ETDEWEB)

    Hartmann, Christoph; Vujic, Zoran [Westinghouse Electric Germany GmbH, Mannheim (Germany)

    2017-06-15

    Due to requirements for nuclear power plants to withstand beyond design basis accidents, including events such as happened in 2011 in the Fukushima Daiichi Nuclear Power Plant in Japan, alternative cooling of spent fuel is needed. Alternative spent fuel cooling can be provided by a retrofitted spent fuel pool spray system based on the AP1000 plant design. As part of Krsko Nuclear Power Plant's Safety Upgrade Program, Krsko Nuclear Power Plant decided on, and Westinghouse successfully designed a retrofit of the AP1000 {sup registered} plant spent fuel pool spray system to provide alternative spent fuel cooling.

  4. Retrofitting of activated charcoal filters in the iodine removal system of Cirus reactor

    International Nuclear Information System (INIS)

    Arora, M.K.; Thomas, Shibu; Ullas, O.P.; Sharma, V.K.; Singh, Kapil Deo S.

    2002-01-01

    Full text: The emergency exhaust system for removal of iodine in the 40 MWt Cirus reactor consisted of a caustic scrubber followed by a bank of silver-coated copper mesh filters. The latter filter elements are no longer commercially available, and moreover, there is need to upgrade the system to meet the current safety norms. An iodine removal system based on activated charcoal adsorbers has been selected for this purpose. The design of the system ensures high iodine removal efficiency and thermal safety of the filters for a postulated accident condition beyond design basis accident. The new iodine removal system has been retrofitted during the current refurbishing programme of Cirus and it has been commissioned and tested satisfactorily

  5. Optimisation of petroleum refinery water network systems retrofit incorporating reuse, regeneration and recycle strategies

    Energy Technology Data Exchange (ETDEWEB)

    Khor, Cheng Seong; Shah, Nilay [Imperial College London (United Kingdom); Mahadzir, Shuhaimi [Universiti Teknologi Petronas (Malaysia); Elkamel, Ali [University of Waterloo (Canada)

    2012-02-15

    Increasingly strict environmental regulations have given rise to higher requirements for operating efficiency and optimization and water has become a vital resource in the refining process and allied industries. Due to this high demand for water, plants may be exposed to supply interruptions and shortages in the future. Major concerns in the petroleum refining industry are the scarcity of fresh water supply and increasingly rigid rules on wastewater discharge, which have resulted from concerns over the environmental impact. This paper presents the efforts made to develop an optimization framework for design of petroleum refinery water network systems and retrofitting that incorporates reuse, regeneration, and recycling strategies. This framework includes the complementary advantage of water pinch analysis (WPA). Water minimization strategies were incorporated as first postulates in a superstructural representation that includes all feasible flow-sheet options for taking advantage of water reuse, regeneration and recycling opportunities. Additionally, a post-optimization analysis was carried out to evaluate the repeated treatment processes required to identify the most efficient retrofit option.

  6. Requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work

    International Nuclear Information System (INIS)

    2013-01-01

    The project on the requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work includes contributions on the following topics: the development of the European transmission grid, the grid extension law, restrictions for the power grid and their infrastructure, requirements for the regulations concerning the realization of the transnational grid extension, inclusion of the public - public acceptance - communication, requirements concerning the environmental compensation law, overhead line - underground cable - health hazards, ecological effects of overhead lines and underground cables, infrastructural projects, power supply in the future, structural relief by photovoltaics.

  7. Stereoscopic optical viewing system

    Science.gov (United States)

    Tallman, C.S.

    1986-05-02

    An improved optical system which provides the operator with a stereoscopic viewing field and depth of vision, particularly suitable for use in various machines such as electron or laser beam welding and drilling machines. The system features two separate but independently controlled optical viewing assemblies from the eyepiece to a spot directly above the working surface. Each optical assembly comprises a combination of eye pieces, turning prisms, telephoto lenses for providing magnification, achromatic imaging relay lenses and final stage pentagonal turning prisms. Adjustment for variations in distance from the turning prisms to the workpiece, necessitated by varying part sizes and configurations and by the operator's visual accuity, is provided separately for each optical assembly by means of separate manual controls at the operator console or within easy reach of the operator.

  8. Research and development of utilization technology of solar thermal system for industrial and other use. Research and development of solar system (research for solar/energy-conservation technology retrofitted to existing buildings); Sangyoyo nado solar system jitsuyoka gijutsu kaihatsu. Solar system no chosa kenkyu (solar toshi muke gijutsu ni kansuru chosa)

    Energy Technology Data Exchange (ETDEWEB)

    Takita, M [New Energy and Industrial Technology Development Organization, Tokyo (Japan)

    1994-12-01

    Described herein are the results of the FY1994 research program for solar/energy-conversion technologies retrofitted to existing buildings. The estimated effects and economic viability of retrofitting technologies show that they bring very high energy-saving effects when applied to heating and hot water supply, which consume a large portion of energy, but relatively low energy-saving effects when applied to cooling, solar walls, glazed balconies and transparent insulators. The study on applicability of these technologies in Japan indicates that the technologies which can recover cost within an average life time are those applied to windows, solar collector systems for hot water supply and heating, and transparent insulators. Although these technologies are low in applicability to cooling viewed from the angle of cost recovery, retrofitted radiation type cooling systems improve not only cooling and energy-saving effects but also comfortableness.

  9. Retrofitting of an improved stack monitoring system in Rajasthan atomic power station

    International Nuclear Information System (INIS)

    Natarajan, K.

    1985-01-01

    The problems encountered in the measurement of inert gas activities, iodine activity and tritium activity released through the stack in RAPS are described and the considerations for the development of improved instruments outlined. The new approach provides for better accuracy of measurement of all the relevant radioactive parameters in the stack at one centralised place. The construction work in the station for the newly conceived stack activity monitoring system is completed and the earlier equipment used is installed in the room temporarily. Development prototypes of stack inert gas monitoring system and iodine monitoring system as described in Section 5 are made and evaluated. Fabrication of new equipment for retrofitting in RAPS is in progress and these will replace the equipment temporarily installed in the station

  10. Use of KPIs in an integrated decision support system for energy efficient district retrofitting

    NARCIS (Netherlands)

    Bektas, K.E.; Luiten, G.T.

    2014-01-01

    Retrofitting urban districts is a complex process. It deals with multiple stakeholders who have wide range of stakes, priorities, different time horizons and scale of investments. This complexity is boosted by the energy policies, as the retrofitting requires to incorporate both selection and use of

  11. Deep Residential Retrofits in East Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Boudreaux, Philip R [ORNL; Hendrick, Timothy P [ORNL; Christian, Jeffrey E [ORNL; Jackson, Roderick K [ORNL

    2012-04-01

    also monitored, with temperature and humidity measured in all conditioned zones, attics, crawlspaces, and unconditioned basements. In some homes, heat flux transducers are installed on the basement walls to help determine the insulating qualities of the technologies and practices. EnergyGauge is used to estimate the pre-retrofit and post-retrofit home energy rating system (HERS) index and reduction in energy consumption and energy bill. In a follow-up report, data from the installed sensors will be presented and analyzed as well as a comparison of the post-retrofit energy consumption of the home to the EnergyGauge model of the post-retrofit home. Table ES1 shows the retrofits that were completed at the eight households where some or all of the recommended retrofits were completed. Home aliases are used to keep the homeowners anonymous. Some key findings of this study thus far are listed as follows. Some homeowners (50%) are not willing to spend the money to reach 30 50% energy savings. Quality of retrofit work is significantly variable among contractors which impact the potential energy savings of the retrofit. Challenges exist in defining house volume and floor area. Of the five homes that completed all the recommended retrofits, energy bill savings was not the main driver for energy retrofits. In no case were the retrofits cost neutral given a 15 year loan at 7% interest for the retrofit costs.

  12. Unstable Resonator Retrofitted Handheld Laser Designator

    Science.gov (United States)

    1978-06-01

    retrofitted with a negative-branch unstable resona- tor laser and hybrid pump cavity in place of the conventional plane-mirror/ porro prism resonator and...directed by prism B to an expanding telescope, shared with the viewing system of the designator. The actual, unfolded resonator length is approxi...was performed based on using a plane- parallel cavity consisting of a 47% reflectivity output coupler, porro - prism reflector, and the same LiNb03

  13. HVAC retrofit for healthy schools

    International Nuclear Information System (INIS)

    Thompson, R.C.; Fisher, G.; Brennan, T.; Turner, W.A.; McKnight, F.

    1991-01-01

    The Environmental Protection Agency has evaluated the impacts of HVAC systems and building dynamics on radon concentrations in 26 schools across the United States. Diagnostic data indicated that radon was not the only indoor air pollutant in these schools. As a result, an essential step in the School Evaluation Program is determination of the feasibility of using HVAC technology for radon remediation in addition to general indoor air improvement. In 1990, the EPA sponsored the HVAC retrofit of two schools in Maine. This paper presents the information gained by these case studies. First, the extensive pre-retrofit diagnostics and characterizations of the two schools are reviewed. Then follows a discussion of why and how the HVAC systems, including unit ventilators, central air-handling units, and heat recovery ventilation, were retrofitted. Finally, an appraisal of the post-retrofit radon and CO 2 levels is made, along with presentation of related data such as retrofit costs and energy and comfort impacts

  14. District heating and cooling systems for communities through power plant retrofit and distribution network. Final report. Volume I. Text

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-15

    An analysis was performed investigating the potential of retrofitting Detroit Edison's Conners Creek power plant to supply district heating and cooling to an area surrounding the plant and within the City of Detroit. A detailed analysis was made of the types and ages of the buildings in the service area as a basis for establishing loads. The analysis of the power plant established possible modifications to the turbines to serve the load in the area. Based upon the service area data and plant retrofit schemes, a distribution system was developed incrementally over a 20-y period. An economic analysis of the system was performed to provide cash flows and payback periods for a variety of energy costs, system costs, and escalation rates to determine the economic viability of the system analyzed. The legal and regulatory requirements required of the district heating and cooling system owner in Michigan were also analyzed to determine what conditions must be met to own and operate the system.

  15. HVAC retrofitting and remodeling

    Energy Technology Data Exchange (ETDEWEB)

    Linford, R.G. [Linford Co., Oakland, CA (United States)

    1996-03-01

    This article describes the pitfalls and problems as well as the benefits of updating a HVAC system. Failures and successes, and the lessons learned working in this dominant portion of the construction market are included as the author describes retrofit projects. The projects have ranged from total replacements in unoccupied buildings to updating systems in occupied buildings.

  16. Multifamily Ventilation Retrofit Strategies

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K. [Building Science Corporation (BSC), Somerville, MA (United States); Lstiburek, J. [Building Science Corporation (BSC), Somerville, MA (United States); Bergey, D. [Building Science Corporation (BSC), Somerville, MA (United States)

    2012-12-01

    In multifamily buildings, central ventilation systems often have poor performance, overventilating some portions of the building (causing excess energy use), while simultaneously underventilating other portions (causing diminished indoor air quality). BSC and Innova Services Corporation performed a series of field tests at a mid-rise test building undergoing a major energy audit and retrofit, which included ventilation system upgrades.

  17. District heating and cooling systems for communities through power plant retrofit and distribution networks. Phase I. Identification and assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The study assesses the preliminary technical, economic, and institutional feasibility of district heating systems achieved by retrofitting existing utility power plants in three Wisconsin cities: Green Bay, Janesville/Beloit, and Madison. The overall approach consists of surveying the State of Wisconsin to identify all existing intermediate and base-loaded electric-generating facilities. Once identified, screening criteria are developed to narrow the list to the three most promising sites. For each of the three sites, an extensive market analysis is performed to identify and characterize thermal loads and survey potential users on their views and concerns regarding the concept. Parallel to this effort, each of the three sites is evaluated on its technical and institutional merits. The technical evaluation centers on identifying and evaluating utility plant retrofit schemes and distribution system alternatives to service the identified thermal market. The institutional analysis evaluates potential barriers such as environmental, distribution system right-of-way, and legal issues within the infrastructure of the state, city, and community. Finally, all previous aspects of the analysis are combined to determine the economic viability of each site. It is concluded that Green Bay is the most promising site.

  18. Feasibility study for retrofitting biogas cogeneration systems to district heating in South Korea.

    Science.gov (United States)

    Chung, Mo; Park, Hwa-Choon

    2015-08-01

    A feasibility study was performed to assess the technical and economic merits of retrofitting biogas-based cogeneration systems to district heating networks. Three district heating plants were selected as candidates for accommodating heat recovery from nearby waste treatment stations, where a massive amount of biogas can be produced on a regular basis. The scenario involves constructing cogeneration systems in each waste treatment station and producing electricity and heat. The amounts of biogas production for each station are estimated based on the monthly treatment capacities surveyed over the most recent years. Heat produced by the cogeneration system is first consumed on site by the waste treatment system to keep the operating temperature at a proper level. If surplus heat is available, it will be transported to the nearest district heating plant. The year-round operation of the cogeneration system was simulated to estimate the electricity and heat production. We considered cost associated with the installation of the cogeneration system and piping as initial investments. Profits from selling electricity and recovering heat are counted as income, while costs associated with buying biogas are expenses. Simple payback periods of 2-10 years were projected under the current economic conditions of South Korea. We found that most of the proposed scenarios can contribute to both energy savings and environmental protection. © The Author(s) 2015.

  19. A multi-objective optimization model for energy-efficiency building envelope retrofitting plan with rooftop PV system installation and maintenance

    International Nuclear Information System (INIS)

    Fan, Yuling; Xia, Xiaohua

    2017-01-01

    Highlights: • A multi-objective optimization model for building envelope retrofit is presented. • Facility performance degradation and maintenance is built into the model. • A rooftop PV system is introduced to produce electricity. • Economic factors including net present value and payback period are considered. - Abstract: Retrofitting existing buildings with energy-efficient facilities is an effective method to improve their energy efficiency, especially for old buildings. A multi-objective optimization model for building envelope retrofitting is presented. Envelope components including windows, external walls and roofs are considered to be retrofitted. Installation of a rooftop solar panel system is also taken into consideration in this study. Rooftop solar panels are modeled with their degradation and a maintenance scheme is studied for sustainability of energy and its long-term effect on the retrofitting plan. The purpose is to make the best use of financial investment to maximize energy savings and economic benefits. In particular, net present value, the payback period and energy savings are taken as the main performance indicators of the retrofitting plan. The multi-objective optimization problem is formulated as a non-linear integer programming problem and solved by a weighted sum method. Results of applying the designed retrofitting plan to a 50-year-old building consisting of 66 apartments demonstrated the effectiveness of the proposed model.

  20. Retrofitted Solar Domestic Hot Water Systems for Swedish Single-Family Houses—Evaluation of a Prototype and Life-Cycle Cost Analysis

    Directory of Open Access Journals (Sweden)

    Luis Ricardo Bernardo

    2016-11-01

    Full Text Available According to recent technology road maps, system cost reductions and development of standardised plug-and-function systems are some of the most important goals for solar heating technology development. Retrofitting hot water boilers in single-family houses when installing solar collectors has the potential to significantly reduce both material and installation costs. Previous studies have investigated such retrofitting, using theoretical simulations and laboratory tests, but no actual installations were made and tested in practice. This article describes the installation, measured performance and cost effectiveness of a retrofitting solution that converts existing domestic hot water heaters to a solar domestic hot water system. The measured performance is characterised by the monthly and annual solar fractions. The cost effectiveness is evaluated by a life-cycle cost analysis, comparing the retrofitted system to a conventional solar domestic hot water system and the case without any solar heating system. Measurements showed that approximately 50% of the 5000 kWh/year of domestic hot water consumption was saved by the retrofitted system in south Sweden. Such savings are in agreement with previous estimations and are comparable to the energy savings when using a conventional solar domestic hot water system. The life-cycle cost analysis showed that, according to the assumptions and given climate, the return on investment of the retrofitted system is approximately 17 years, while a conventional system does not reach profitability during its lifetime of 25 years.

  1. Simulation-based method to determine climatic energy strategies of an adaptable building retrofit façade system

    International Nuclear Information System (INIS)

    Capeluto, I. Guedi; Ochoa, Carlos E.

    2014-01-01

    Vast amounts of the European residential stock were built with limited consideration for energy efficiency, yet its refurbishment can help reach national energy reduction goals, decreasing environmental impact. Short-term retrofits with reduced interference to inhabitants can be achieved by upgrading facades with elements that enhance energy efficiency and user comfort. The European Union-funded Meefs Retrofitting (Multifunctional Energy Efficient Façade System) project aims to develop an adaptable mass-produced facade system for energy improvement in existing residential buildings throughout the continent. This article presents a simplified methodology to identify preferred strategies and combinations for the early design stages of such system. This was derived from studying weather characteristics of European regions and outlining climatic energy-saving strategies based on human thermal comfort. Strategies were matched with conceptual technologies like glazing, shading and insulation. The typical building stock was characterized from statistics of previous European projects. Six improvements and combinations were modelled using a simulation model, identifying and ranking preferred configurations. The methodology is summarized in a synoptic scheme identifying the energy rankings of each improvement and combination for the studied climates and façade orientations. - Highlights: • First results of EU project for new energy efficient façade retrofit system. • System consists of prefabricated elements with multiple options for flexibility. • Modular strategies were determined that adapt to different climates. • Technologies matching the strategies were identified. • Presents a method for use and application in different climates across Europe

  2. Energy-Based Design Criterion of Dissipative Bracing Systems for the Seismic Retrofit of Frame Structures

    Directory of Open Access Journals (Sweden)

    Gloria Terenzi

    2018-02-01

    Full Text Available Direct sizing criteria represent useful tools in the design of dissipative bracing systems for the advanced seismic protection of existing frame structures, especially when incorporated dampers feature a markedly non-linear behaviour. An energy-based procedure is proposed herein to this aim, focusing attention on systems including fluid viscous devices. The procedure starts by assuming prefixed reduction factors of the most critical response parameters in current conditions, which are evaluated by means of a conventional elastic finite element analysis. Simple formulas relating the reduction factors to the equivalent viscous damping ratio of the dampers, ξeq, are proposed. These formulas allow calculating the ξeq values that guarantee the achievement of the target factors. Finally, the energy dissipation capacity of the devices is deduced from ξeq, finalizing their sizing process. A detailed description of the procedure is presented in the article, by distinguishing the cases where the prevailing structural deficiencies are represented by poor strength of the constituting members, from the cases having excessive horizontal displacements. A demonstrative application to the retrofit design of a reinforced concrete gym building is then offered to explicate the steps of the sizing criterion in practice, as well as to evaluate the enhancement of the seismic response capacities generated by the installation of the dissipative system.

  3. Seismic Retrofit of Reinforced Concrete Frame Buildings with Hysteretic Bracing Systems: Design Procedure and Behaviour Factor

    Directory of Open Access Journals (Sweden)

    Antonio Di Cesare

    2017-01-01

    Full Text Available This paper presents a design procedure to evaluate the mechanical characteristics of hysteretic Energy Dissipation Bracing (EDB systems for seismic retrofitting of existing reinforced concrete framed buildings. The proposed procedure, aiming at controlling the maximum interstorey drifts, imposes a maximum top displacement as function of the seismic demand and, if needed, regularizes the stiffness and strength of the building along its elevation. In order to explain the application of the proposed procedure and its capacity to involve most of the devices in the energy dissipation with similar level of ductility demand, a simple benchmark structure has been studied and nonlinear dynamic analyses have been performed. A further goal of this work is to propose a simplified approach for designing dissipating systems based on linear analysis with the application of a suitable behaviour factor, in order to achieve a widespread adoption of the passive control techniques. At this goal, the increasing of the structural performances due to the addition of an EDB system designed with the above-mentioned procedure has been estimated considering one thousand case studies designed with different combinations of the main design parameters. An analytical formulation of the behaviour factor for braced buildings has been proposed.

  4. Retrofitting the AutoBayes Program Synthesis System with Concrete Syntax

    Science.gov (United States)

    Fischer, Bernd; Visser, Eelco

    2004-01-01

    AutoBayes is a fully automatic, schema-based program synthesis system for statistical data analysis applications. Its core component is a schema library. i.e., a collection of generic code templates with associated applicability constraints which are instantiated in a problem-specific way during synthesis. Currently, AutoBayes is implemented in Prolog; the schemas thus use abstract syntax (i.e., Prolog terms) to formulate the templates. However, the conceptual distance between this abstract representation and the concrete syntax of the generated programs makes the schemas hard to create and maintain. In this paper we describe how AutoBayes is retrofitted with concrete syntax. We show how it is integrated into Prolog and describe how the seamless interaction of concrete syntax fragments with AutoBayes's remaining legacy meta-programming kernel based on abstract syntax is achieved. We apply the approach to gradually mitigate individual schemas without forcing a disruptive migration of the entire system to a different First experiences show that a smooth migration can be achieved. Moreover, it can result in a considerable reduction of the code size and improved readability of the code. In particular, abstracting out fresh-variable generation and second-order term construction allows the formulation of larger continuous fragments.

  5. Multicriteria Spatial Decision Support Systems for Future Urban Energy Retrofitting Scenarios

    Directory of Open Access Journals (Sweden)

    Patrizia Lombardi

    2017-07-01

    Full Text Available Nowadays, there is an increasing concern about sustainable urban energy development taking into account national priorities of each city. Many cities have started to define future strategies and plans to reduce energy consumption and greenhouse gas emissions. Urban energy scenarios involve the consideration of a wide range of conflicting criteria, both socio-economic and environmental ones. Moreover, decision-makers (DMs require proper tools that can support their choices in a context of multiple stakeholders and a long-term perspective. In this context, Multicriteria Spatial Decision Support Systems (MC-SDSS are often used in order to define and analyze urban scenarios since they support the comparison of different solutions, based on a combination of multiple factors. The main problem, in relation to urban energy retrofitting scenarios, is the lack of appropriate knowledge and evaluation criteria. The latter are crucial for delivering and assessing urban energy scenarios through a MC-SDSS tool. The main goal of this paper is to analyze and test two different methods for the definition and ranking of the evaluation criteria. More specifically, the paper presents an on-going research study related to the development of a MC-SDSS tool able to identify and evaluate alternative energy urban scenarios in a long-term period perspective. This study refers to two Smart City and Communities research projects, namely: DIMMER (District Information Modeling and Management for Energy Reduction and EEB (Zero Energy Buildings in Smart Urban Districts.

  6. Retrofit breakers resolve trip failures

    International Nuclear Information System (INIS)

    Hanna, G.L.

    1995-01-01

    This articles examines how power plants can use advance planning and retrofit equipment to upgrade existing systems while avoiding unnecessary downtime. A break that fails to open challenges the safety features of a nuclear power plant. To ensure reliable operations, the utility selected a comprehensive retrofit program to replace a third of the 200 breakers originally installed at the Shearon Harris Nuclear Power Plant. Under contract, the retrofits--Siemens RLN breakers--were built and qualified for nuclear service by Wyle Laboratories through a special teaming agreement with Siemens Energy and Automation. The project offers an excellent example of how a utility can use advance planning and retrofit equipment to upgrade its existing systems while avoiding unnecessary downtime

  7. The System View

    Science.gov (United States)

    Noreen, G. K.; Stelzried, C. T.

    1983-01-01

    Analysis of spacecraft to ground communications link performance and a description of the Deep Space Network system is provided. Due to the tremendous distances involved in communicating between the spacecraft at the edge of our solar system and Earth, communications link performance is stretched to the limit of theoretical predictions. This is required in order to return the maximum amount of data possible during critical events such as planetary flybys. The link analysis provides a basis for the initial link design before spacecraft launch and performance prediction and monitoring during spacecraft flight. Additionally, it indicates what performance upgrades are required for mission extensions and new missions. Performance is improved through the use of a larger antenna collecting area, greater transmitter power, lower receiving system noise temperature and more sophisticated data coding schemes. The performance of the Deep Space Station configuration which serves as the ground portion of the communications link is assessed.

  8. Harnessing the hybrid power supply systems of utility grid and photovoltaic panels at retrofit residential single family building in Medan

    Science.gov (United States)

    Pangaribuan, A. B.; Rahmat, R. F.; Lidya, M. S.; Zálešák, M.

    2017-01-01

    The paper describes improvisation mode of energy supply source by collaboration between national utility grid as represented by fossil fuels and PV as independent renewable power resource in order to aim the energy consumptions efficiently in retrofit single family house. In this case, one existing single family house model in Medan, Indonesia was observed for the possibility of future refurbishment. The eco-design version of the house model and prediction analyses regarding nearby potential renewable energy resource (solar system) had been made using Autodesk Revit MEP 2015, Climate Consultant 6.0 and Green Building Studio Analysis. Economical evaluation of using hybrid power supply is discussed as well.

  9. Micro view system (Toshiba)

    International Nuclear Information System (INIS)

    Tanaka, Takeshi; Kimata, Shinichi; Hirosawa, Koshichiro

    1981-01-01

    Digital processing of nuclear medical images consists of inputting the image, the process of adding adjustments, processing the image to meet diagnostic purposes, and storing this information. Discussion is made on the input of analog information transferred from a gamma camera, inputting the image in numeral matrix, number and size of image elements, modification processes, processing and display of the original data thus obtained, image processing of these data for medicine and storage of the information. The digital processing of nuclear medical images could be done satisfactorily with information of 10 kCPS in 64 x 64 (or 128 x 128) image elements in 16 bit frame mode. The personal computer M223 Mark II (SORD) was selected because it satisfied these requirements, and a system allowing image display was developed. (Kaihara, S.)

  10. Analysis of energy efficiency retrofit schemes for heating, ventilating and air-conditioning systems in existing office buildings based on the modified bin method

    International Nuclear Information System (INIS)

    Wang, Zhaoxia; Ding, Yan; Geng, Geng; Zhu, Neng

    2014-01-01

    Highlights: • A modified bin method is adopted to propose and optimize the EER schemes. • A case study is presented to demonstrate the analysis procedures of EER schemes. • Pertinent EER schemes for HVAC systems are proposed for the object building. - Abstract: Poor thermal performance of building envelop and low efficiencies of heating, ventilating and air-conditioning (HVAC) systems can always be found in the existing office buildings with large energy consumption. This paper adopted a modified bin method to propose and optimize the energy efficiency retrofit (EER) schemes. An existing office building in Tianjin was selected as an example to demonstrate the procedures of formulating the design scheme. Pertinent retrofit schemes for HVAC system were proposed after the retrofit of building envelop. With comprehensive consideration of energy efficiency and economic benefits, the recommended scheme that could improve the overall energy efficiency by 71.20% was determined

  11. Retrofitting Domestic Hot Water Heaters for Solar Water Heating Systems in Single-Family Houses in a Cold Climate: A Theoretical Analysis

    Directory of Open Access Journals (Sweden)

    Björn Karlsson

    2012-10-01

    Full Text Available One of the biggest obstacles to economic profitability of solar water heating systems is the investment cost. Retrofitting existing domestic hot water heaters when a new solar hot water system is installed can reduce both the installation and material costs. In this study, retrofitting existing water heaters for solar water heating systems in Swedish single-family houses was theoretically investigated using the TRNSYS software. Four simulation models using forced circulation flow with different system configurations and control strategies were simulated and analysed in the study. A comparison with a standard solar thermal system was also presented based on the annual solar fraction. The simulation results indicate that the retrofitting configuration achieving the highest annual performance consists of a system where the existing tank is used as storage for the solar heat and a smaller tank with a heater is added in series to make sure that the required outlet temperature can be met. An external heat exchanger is used between the collector circuit and the existing tank. For this retrofitted system an annual solar fraction of 50.5% was achieved. A conventional solar thermal system using a standard solar tank achieves a comparable performance for the same total storage volume, collector area and reference conditions.

  12. Retrofitting Conventional Electric Domestic Hot Water Heaters to Solar Water Heating Systems in Single-Family Houses—Model Validation and Optimization

    Directory of Open Access Journals (Sweden)

    Luis R. Bernardo

    2013-02-01

    Full Text Available System cost reductions and development of standardised plug-and-function systems are some of the most important goals for solar heating technology development. Retrofitting hot water boilers in single-family houses when installing solar collectors has the potential to significantly reduce both material and installation costs. In this study, the TRNSYS simulation models of the retrofitting solar thermal system were validated against measurements. Results show that the validated models are in good agreement with measurements. On an annual basis a deviation of 2.5% out of 1099 kWh was obtained between the auxiliary energy from results and from the simulation model for a complete system. Using the validated model a system optimization was carried out with respect to control strategies for auxiliary heating, heat losses and volume of auxiliary storage. A sensitivity analysis was carried out regarding different volumes of retrofitted hot water boiler, DHW profiles and climates. It was estimated that, with adequate improvements, extended annual solar fractions of 60%, 78% and 81% can be achieved for Lund (Sweden, Lisbon (Portugal and Lusaka (Zambia, respectively. The correspondent collector area was 6, 4 and 3 m2, respectively. The studied retrofitted system achieves a comparable performance with conventional solar thermal systems with the potential to reduce the investment cost.

  13. EMCS Retrofit Analysis - Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  14. Views of the solar system

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, C.

    1995-02-01

    Views of the Solar System has been created as an educational tour of the solar system. It contains images and information about the Sun, planets, moons, asteroids and comets found within the solar system. The image processing for many of the images was done by the author. This tour uses hypertext to allow space travel by simply clicking on a desired planet. This causes information and images about the planet to appear on screen. While on a planet page, hyperlinks travel to pages about the moons and other relevant available resources. Unusual terms are linked to and defined in the Glossary page. Statistical information of the planets and satellites can be browsed through lists sorted by name, radius and distance. History of Space Exploration contains information about rocket history, early astronauts, space missions, spacecraft and detailed chronology tables of space exploration. The Table of Contents page has links to all of the various pages within Views Of the Solar System.

  15. District heating and cooling systems for communities through power plant retrofit distribution network. Final report, September 1, 1978-May 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This volume presents information on the institutional factors, i.e., legal and regulatory aspects, a preliminary economic analysis, and a proposal for future studies on retrofitting existing thermal power plants so that they can supply heat for district heating and cooling systems for communities. (LCL)

  16. Comparative Assessment of Thermal Performance of Existing Roof System and Retrofitted Green Roof System in Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nil TÜRKERİ

    2011-01-01

    Full Text Available Urban heat islands, temperature increase due to climate change and energy consumption due to high summer cooling load are significant issues in Turkey. International studies indicate that the green roof system serves as an energy efficient building technology. However, the thermal performance of green roofs when exposed to local climate conditions is still unknown in Turkey. A research project is being conducted at Istanbul Technical University, in which part of a low-slope existing roof system was retrofitted as an extensive green roof system and the thermal performances of both the existing roof and green roof were monitored in order to make a comparative assessment. Both the green roof and the existing roof were instrumented to measure the temperature profile within the roof systems and the solar reflectance of the roof surfaces. Local meteorological variables were also measured. Results obtained from the field monitoring revealed the following data. Reflected solar radiation from the green roof surface was slightly higher than from the existing roof surface. This was likely to be due to the fact that the plants had not yet covered the entire soil surface area of the green roof. Plants reduced the amount of heat absorbed by the growing medium during daytime through shading and reduced the surface temperature of the green roof. Ceiling temperatures of rooms under the existing roof and green roof indicated that heat transfer to the room beneath the green roof was reduced as well. The green roof reduced the heat gain due to the thermal mass of the soil. This created a buffer against daily fluctuations in temperature and minimized temperature extremes.

  17. Proposal of new seismic assessment and retrofit technology for existing buildings; Hyogoken nanbu jishin higai wo kyokun to shita kison kozobutsu no taishin shindan system

    Energy Technology Data Exchange (ETDEWEB)

    Yoshioka, K.; Takahashi, Y.; Seki, M.; Tanida, M.; Akiyama, T.; Hashimoto, Y. [Obayashi Corp., Tokyo (Japan)

    1995-08-10

    A devastating earthquake measuring 7.2 on the JMA (Japan Meteorological Agency) magnitude hit the southern Hyogo Prefecture on January 17, 1995. This earthquake, the worst in Japan since the Great Kanto Earthquake in 1923, brought great disaster and destruction to the Hanshin area and Awajishima Island. Most of the damage to concrete and steel structures occurred in buildings designed according to former building codes. Fewer collapses occurred in buildings designed under current building code that have more severe seismic requirements. Existing buildings should be assessed by their seismic potentiality, and retrofitted to escape damage in severe earthquakes such as the Great Hanshin Earthquake. New technology for assessing and retrofitting existing buildings was developed to improve resisting performance in response to severe earthquakes. Earthquake Load or motion exceeding current requirements can be supplied to assess and retrofit existing buildings if a client wants their buildings to exhibit much stronger seismic resistance. The retrofit technologies, such as a base isolation system for whole building, vibration control bracing system with steel damper, and base isolation floor system for computer equipments, can be applied to existing buildings. 11 refs., 9 figs., 8 tabs.

  18. Research on the evaluation system for heat metering and existing residential building retrofits in northern regions of China for the 12th five-year period

    International Nuclear Information System (INIS)

    Xin, Liu; Yan, Ding; Yujia, Tong; Neng, Zhu; Zhe, Tian

    2014-01-01

    On the basis of ERBR (existing residential building retrofit) work in the 11th five-year period, energy efficiency retrofits for old residential buildings have been further promoted in northern regions of China during the 12th five-year period. ERBR projects are capable of not only achieving energy conservation and emissions reductions but also providing warmer rooms for residents during cold winters. Therefore, this project should be continued in northern regions of China following a long-term management mode. With the aim of exploring methods and mechanisms for the evaluation of the retrofit effect, an evaluation method was established with the application of the multi-level expert evaluation method. The evaluation indexes cover the aspects of policy mechanisms, financing modes and technical measures. A rewards and punishment mechanism according to the evaluation system was also suggested. Such an evaluation system can be used as a valuable reference for future implementation of energy efficiency retrofit work. - Highlights: • With the AHPD method, the evaluation system of the ERBR was set up to complete. • There are 29 indicators, including policies, financings and technologies. • Rewards and punishment mechanisms are offered to the ERBR. • For weight value more than 0.06, long-term practice and accumulation are needed

  19. Sunnyvale Marine Climate Deep Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    German, A.; Siddiqui, A.; Dakin, B.

    2014-11-01

    The Alliance for Residential Building Innovation (ARBI) and Allen Gilliland of One Sky Homes collaborated on a marine climate retrofit project designed to meet both Passive House (PH) and Building America (BA) program standards. The scope included sealing, installing wall, roof and floor insulation (previously lacking), replacing windows, upgrading the heating and cooling system, and installing.

  20. Energy Retrofit--Step One.

    Science.gov (United States)

    Canipe, Stephen L.; And Others

    1983-01-01

    A School Retrofit Design Analysis System (SRDAS) provides energy modeling analyses of school buildings. SRDAS has three subprograms that consider first, roof, windows, walls, floors, and infiltration sites; second, costs per student, compliance with national energy consumption norms, and electricity costs projections; and third, financial savings…

  1. Sunnyvale Marine Climate Deep Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    German, A. [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States); Siddiqui, A. [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States); Dakin, B. [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States)

    2014-11-01

    The Alliance for Residential Building Innovation (ARBI) and Allen Gilliland of One Sky Homes collaborated on a marine climate retrofit project designed to meet both Passive House (PH) and Building America program standards. The scope included sealing, installing wall, roof and floor insulation (previously lacking), replacing windows, upgrading the heating and cooling system, and installing mechanical ventilation.

  2. Requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work; Anforderungen an den Um- und Ausbau des Hoechstspannungsstromnetzes. Aus der Sicht von Naturschutz und Kulturlandschaftspflege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-15

    The project on the requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work includes contributions on the following topics: the development of the European transmission grid, the grid extension law, restrictions for the power grid and their infrastructure, requirements for the regulations concerning the realization of the transnational grid extension, inclusion of the public - public acceptance - communication, requirements concerning the environmental compensation law, overhead line - underground cable - health hazards, ecological effects of overhead lines and underground cables, infrastructural projects, power supply in the future, structural relief by photovoltaics.

  3. Strengthening Building Retrofit Markets

    Energy Technology Data Exchange (ETDEWEB)

    Templeton, Mary [Michigan Saves; Jackson, Robert [Michigan Energy Office

    2014-04-15

    The Business Energy Financing (BEF) program offered commercial businesses in Michigan affordable financing options and other incentives designed to support energy efficiency improvements. We worked through partnerships with Michigan utilities, lenders, building contractors, trade associations, and other community organizations to offer competitive interest rates and flexible financing terms to support energy efficiency projects that otherwise would not have happened. The BEF program targeted the retail food market, including restaurants, grocery stores, convenience stores, and wholesale food vendors, with the goal of achieving energy efficiency retrofits for 2 percent of the target market. We offered low interest rates, flexible payments, easy applications and approval processes, and access to other incentives and rebates. Through these efforts, we sought to help customers strive for energy savings retrofits that would save 20 percent or more on their energy use. This program helped Michigan businesses reduce costs by financing energy efficient lighting, heating and cooling systems, insulation, refrigeration, equipment upgrades, and more. Businesses completed the upgrades with the help of our authorized contractors, and, through our lending partners, we provided affordable financing options.

  4. Senior citizens retrofits

    Energy Technology Data Exchange (ETDEWEB)

    1985-02-01

    The Seniors' Residential Retrofitting Project was Yukon's most ambitious CREDA, funded demonstration with a total cost of $460,000. The project undertook to demonstrate energy-efficient retrofitting techniques in 38 homes and two apartment complexes for senior citizens. At the same time, the project strove to train Yukon tradesmen in retrofitting techniques, thus creating a local industry and employment within this industry. To this end, two training courses were given for local tradesmen and contractors, the first of their kind in Canada. The training part of the project was given equal importance as the actual demonstration part. Three levels of retrofit work were done on the homes of senior citizens. Level one included caulking, weatherstripping, furnace servicing, and installation of water flow restrictors, water heater blankets and timers. The level two retrofit included the treatment in level one, plus upgrading windows and the insulation levels in walls and ceilings. A level three retrofit involved a total rewrap of the building shell with some of the features in levels one and two incorporated. The demonstration program included the following steps: initial contact with senior citizens; energy audit on each house; determination of level of retrofit work based on individual audit results; contract packages drawn up and put to tender; monitoring of fuel records and air-tightness tests both before and after retrofit; and tabulation of data and information transfer. 10 figs., 4 tabs.

  5. Phased Retrofits in Existing Homes in Florida Phase II: Shallow Plus Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Martin, E. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-02-03

    The BAPIRC team and Florida Power and Light (FPL) electric utility pursued a pilot phased energy-efficiency retrofit program in Florida by creating detailed data on the energy and economic performance of two levels of retrofit - simple and deep. For this Phased Deep Retrofit (PDR) project, a total of 56 homes spread across the utility partner's territory in east central Florida, southeast Florida, and southwest Florida were instrumented between August 2012 and January 2013, and received simple pass-through retrofit measures during the period of March 2013 - June 2013. Ten of these homes received a deeper package of retrofits during August 2013 - December 2013. A full account of Phase I of this project, including detailed home details and characterization, is found in Parker et al, 2015 (currently in draft). Phase II of this project, which is the focus of this report, applied the following additional retrofit measures to select homes that received a shallow retrofit in Phase I: a) Supplemental mini-split heat pump (MSHP) (6 homes); b) Ducted and space coupled Heat Pump Water Heater (8 homes); c) Exterior insulation finish system (EIFS) (1 homes); d) Window retrofit (3 homes); e) Smart thermostat (21 homes: 19 NESTs; 2 Lyrics); f) Heat pump clothes dryer (8 homes); g) Variable speed pool pump (5 homes).

  6. Retrofit flue gas desulfurization system at Indianapolis Power and Light Co. Petersburg Station Units 1 and 2

    International Nuclear Information System (INIS)

    Watson, W.K.; Wolsiffer, S.R.; Youmans, J.; Martin, J.E.; Wedig, C.P.

    1992-01-01

    This paper briefly describes the status of the retrofit wet limestone flue gas desulfurization system (FGDS) project at Indianapolis Power and Light Company (IPL), Petersburg Units 1 and 2. This project was initiated by IPL in response to the Clean Air Act of 1990 and is intended to treat the flue gas from two base load units with a combined capacity of approximately 700 MW gross electrical output. IPL is the owner and operator of the Petersburg Station located in southwestern Indiana. Stone and Webster Engineering Corporation (Stone and Webster) is the Engineer and Constructor for the project. Radian Corporation is a subcontractor to Stone and Webster in the area of flue gas desulfurization (FGD) process. General Electric Environmental Systems, Inc. (GEESI) is the supplier of the FGDS. The project is organized as a team with each company providing services. The supplier of the new stack is scheduled to be selected and join the team in early 1992. Other material suppliers and field contractors will be selected in 1992

  7. A tri-generation retrofit towards green hospitals

    Energy Technology Data Exchange (ETDEWEB)

    Kilkis, Birol I.; Erol, Ozgur; Can Bayram, Doga [Baskent University (Turkey)], email: bkilkis@baskent.edu.tr

    2011-07-01

    According to US Department of Energy statistics, hospitals consume large amounts of energy. Most of this energy involves electricity from steam and goes to providing high quality, reliable services. Energy from steam is an aging technology with low exergy efficiency. It needs to be replaced if the hospitals are to become 'green'. Retrofitting has to be done with various issues of hygiene in mind, both during and after the retrofit. This makes it a difficult task. This paper discusses a provisional technique that maintains the steam heating system while the human and infrastructure environments are adjusted to the retrofit without interfering with the hospital interior. This technique was evolved on the basis of a case study of energy and exergy-efficient thermo-mechanical systems. Results show that steam heating is an outdated system, which is harmful to the environment in terms of CO2 emissions and the energy and exergy points of view. Savings of more than 50% of the fuel presently used in hospitals could be saved with more rational utilization of energy.

  8. Rapid decision support tool based on novel ecosystem service variables for retrofitting of permeable pavement systems in the presence of trees.

    Science.gov (United States)

    Scholz, Miklas; Uzomah, Vincent C

    2013-08-01

    The retrofitting of sustainable drainage systems (SuDS) such as permeable pavements is currently undertaken ad hoc using expert experience supported by minimal guidance based predominantly on hard engineering variables. There is a lack of practical decision support tools useful for a rapid assessment of the potential of ecosystem services when retrofitting permeable pavements in urban areas that either feature existing trees or should be planted with trees in the near future. Thus the aim of this paper is to develop an innovative rapid decision support tool based on novel ecosystem service variables for retrofitting of permeable pavement systems close to trees. This unique tool proposes the retrofitting of permeable pavements that obtained the highest ecosystem service score for a specific urban site enhanced by the presence of trees. This approach is based on a novel ecosystem service philosophy adapted to permeable pavements rather than on traditional engineering judgement associated with variables based on quick community and environment assessments. For an example case study area such as Greater Manchester, which was dominated by Sycamore and Common Lime, a comparison with the traditional approach of determining community and environment variables indicates that permeable pavements are generally a preferred SuDS option. Permeable pavements combined with urban trees received relatively high scores, because of their great potential impact in terms of water and air quality improvement, and flood control, respectively. The outcomes of this paper are likely to lead to more combined permeable pavement and tree systems in the urban landscape, which are beneficial for humans and the environment. Copyright © 2013 Elsevier B.V. All rights reserved.

  9. Practical experience with digital I and C retrofit projects gathered by independent experts

    International Nuclear Information System (INIS)

    Zeck, Kurt; Schildheuer, Reinhard; Weich, Alfred

    2005-01-01

    As independent experts, we have accompanied a series of major projects where plant control systems have been retrofitted with digital I and C technology. As General Expert Inspectors of our authority, we have investigated, inspected and certified such projects - from defining the tasks at hand trough planning, approving, implementing and commissioning down to the regular operation of the equipment. Our special focus has been on the proper adherence to the relevant safety issues in nuclear plants in accordance with the current state-of-the-art in science and technology, and to the applicable codes of practice. In September 2004, at the international 'Nuclear Plant Instrumentation, Control and Human Machine Interface Technology' meeting in Columbus/Ohio, we presented some major retrofit projects and reported about how we, as independent official experts, accompany and monitor the activities of retrofitting plants with advanced digital safety I and C equipment, from the safety point of view. With current report, we would like to provide more detailed information about the practical experience gained with digital safety I and C retrofits and the conclusions drawn for currently ongoing retrofit projects. We will look at both the technical and licensing aspects of implementing such projects

  10. Predicting the performances of a CAMPRO engine retrofitted with liquefied petroleum gas (LPG system using 1-dimensional software

    Directory of Open Access Journals (Sweden)

    Kamaruddin M. Hazeem

    2017-01-01

    Full Text Available Recently, the depletion of petroleum resources and the impact of exhaust emission caused by combustion towards environmental has been forced to all researchers to come out with an alternative ways to prevent this situation become worse. Liquefied petroleum gas (LPG is the most compatible and have a potential to become a source of energy for internal combustion engine. Unfortunately, the investigation of LPG in internal combustion engine among researcher still have a gap in research. Thus, in this study a 1-Dimensional simulation CAMPRO 1.6L engine model using GT-Power is developed to predict the performances of engines that using LPG as a fuel for internal combustion engine. The constructed model simulation will throughout the validation process with the experimental data to make sure the precision of this model. The validation process shows that the results have a good agreement between the simulation model and the experimental data. As a result, the performance of LPG simulation model shows that a Brake Torque (BT, Brake Power (BP and Brake Mean Effective Pressure (BMEP were significantly improved in average of 7% in comparison with gasoline model. In addition, Brake Specific Fuel Consumption (BSFC also shows an improvement by 5%, which is become more economic. Therefore, the developed GT-Power model offer a successful fuel conversion to LPG systems via retrofit technology to provide comprehensive support for implementation of energy efficient and environmental friendly vehicles.

  11. Retrofit options to enable biomass firing at Irish peat plants: Background report 4.2 for the EU Joule 2+ project: Energy from biomass: An assessment of two promising systems for energy production

    International Nuclear Information System (INIS)

    Van den Broek, R.; Faaij, A.; Blaney, G.

    1995-05-01

    An overview is given of the most promising options for retrofitting existing Irish peat plants to accept biomass fuel. It is expected that with low investment costs the existing peat stations can be adapted to enable them to fire biomass. It will also be possible to co-fire peat and biomass, this option will become a way of using biomass in power generation with relatively low risk, both on the field of initial investments and supply security. The objectives of this report are: assessing the different technical options for retrofitting the plants to enable biomass firing; provide investment costs, efficiencies, emissions and expected lifetimes for the different retrofit options. The results from this study are used in the final integration phase of the EU-Joule project 'Energy from biomass'. Chapter 2 deals with methodological considerations which have been made in estimation of the investment costs. In chapter 3 the present situation is described. Both peat harvesting and power plant operation of both sod and milled peat plants are explained. Also some past experiences with wood chips firing in Irish peat stations are discussed. Chapter 4 gives a general view on retrofitting peat plants to enable biomass firing. Some starting points like biomass fuel feeding and emission standards that have to be met are highlighted. The rationale behind four main choices are given. Finally, a technical description is presented of the two boiler adaptations that will be considered among the different retrofit options, namely conversion of milled peat units into bubbling fluidized bed and into a whole tree energy unit. Six retrofit options are described in more detail in chapter 5. Information is given on the present status of the plants, the technical considerations of the retrofit, expected performance and an estimation of a range in which the investment costs can be expected. 4 figs., 10 tabs., 5 appendices

  12. Lighting for remote viewing systems

    International Nuclear Information System (INIS)

    Draper, J.V.

    1984-01-01

    Scenes viewed by television do not provide the same channels of information for judgment of distances as scenes viewed directly, since television eliminates or degrades several depth perception cues. However, it may be possible to improve depth perception of televised scenes by enhancing the information available through depth cues that are available from lighting. A literature survey and expert opinions were integrated to design a remote lighting arrangement which could enhance depth perception of operators performing remote handling operations. This paper describes the lighting arrangement and discusses some of its advantages and disadvantages. 10 references, 2 figures

  13. Lighting for remote viewing systems

    International Nuclear Information System (INIS)

    Draper, J.V.

    1984-01-01

    Scenes viewed by television do not provide the same channels of information for judgement of distances as scenes viewed directly, since television eliminates or degrades several depth perception cues. However, it may be possible to improve depth perception of televised scenes by enhancing the information available through depth cues that are available from lighting. A literature survey and expert opinions were integrated to design a remote lighting arrangement which could enhance depth perception of operators performing remote handling operations. This paper describes the lighting arrangement and discusses some of its advantages and disadvantages. 10 references, 2 figures

  14. Lighting for remote viewing systems

    International Nuclear Information System (INIS)

    Draper, J.V.

    1984-01-01

    Scenes viewed by television do not provide the same channels of information for judgment of distances as scenes viewed directly, since television eliminates or degrades several depth perception cues. However, it may be possible to improve depth perception of televised scenes by enhancing the information available through depth cues that are available from lighting. A literature survey and expert opinions were integrated to design a remote lighting arrangement which could enhance depth perception of operators performing remote handling operations. This paper describes the lighting arrangement and discusses some of its advantages and disadvantages

  15. Lighting for remote viewing systems

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.

    1984-01-01

    Scenes viewed by television do not provide the same channels of information for judgment of distances as scenes viewed directly, since television eliminates or degrades several depth perception cues. However, it may be possible to improve depth perception of televised scenes by enhancing the information available through depth cues that are available from lighting. A literature survey and expert opinions were integrated to design a remote lighting arrangement which could enhance depth perception of operators performing remote handling operations. This paper describes the lighting arrangement and discusses some of its advantages and disadvantages. 10 references, 2 figures.

  16. Lighting for remote viewing systems

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.

    1984-01-01

    Scenes viewed by television do not provide the same channels of information for judgement of distances as scenes viewed directly, since television eliminates or degrades several depth perception cues. However, it may be possible to improve depth perception of televised scenes by enhancing the information available through depth cues that are available from lighting. A literature survey and expert opinions were integrated to design a remote lighting arrangement which could enhance depth perception of operators performing remote handling operations. This paper describes the lighting arrangement and discusses some of its advantages and disadvantages. 10 references, 2 figures.

  17. District heating and cooling system for communities through power plant retrofit and distribution network. Final report, Phase I

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of retrofitting thermal power plants in Minnesota to accommodate both heat and power generation for district heating was examined and is discussed. Three communities were identified as viable sites for co-generation district heating. (LCL)

  18. The role of the design and operation of individual heating systems for the energy retrofits of residential buildings

    International Nuclear Information System (INIS)

    Terés-Zubiaga, J.; Campos-Celador, A.; González-Pino, I.; Diarce, G.

    2016-01-01

    Highlights: • Thermal renovation of buildings is analysed by dynamic simulation. • Different envelope and individual heating options are considered. • Temperature set point plays the most important role in the energy consumption. • Condensing boilers increase 10% the energy savings compared to regular ones. • The rebound effect can cause significant differences on energy consumption. - Abstract: The feasibility of individual natural gas fired boiler-based heating systems in the retrofitting of buildings constructed in the 50–60 s in Bilbao (northern Spain) is evaluated in this paper. A holistic approach through dynamic simulations using TRNSYS is employed for the purpose. An existing dwelling previously monitored and used to validate the model applied is selected as a case study. 54 different scenarios are evaluated, which arise from the combination of 3 different envelope options, 2 types of heat production units, 3 heat production temperatures and 3 comfort temperature set-points. The cases are evaluated in terms of energy results, economic aspects, and the influence of user behaviour. Regarding the latter, the influence of the potential rebound effect is also evaluated. The results show energy savings nearby 10% when condensing boilers are compared with high efficiency boilers. In relation to hot water production temperature, energy savings between 5 and 10% are found when the temperature is lowered from 60 to 50 °C. The greatest impact on energy consumption is related to the occupants’ behaviour: reductions up to 89% are achieved if the indoor temperature set-point is lowered 2 °C. This is reinforced with the results related to the rebound effect, which show significant differences on energy consumption values. These evidences demonstrate that the user behaviour is an essential feature to be considered in studies regarding buildings energy performance. As a consequence, the holistic approach herein employed emerges as a key tool to be applied in

  19. Retrofitting solutions for two different occupancy levels of educational buildings in tropics

    Science.gov (United States)

    Yang, Junjing; Pantazaras, Alexandros; Lee, Siew Eang; Santamouris, Mattheos

    2018-01-01

    Within the multi-functionality of educational buildings, the energy conservation potential can be very different. In addition, among different retrofitting solutions investigated involving interventions on the building envelope, ventilation strategies, artificial lighting systems as well as equipment upgrading, different saving potential would come from different aspects. The opportunities for energy saving potential from the overall point of view and from the detailed aspect view of different retrofitting solutions would be very useful and important for building renovation decision making. This study presents a detailed retrofitting study of two different educational buildings. One represents a building with average occupancy variation and containing mainly offices and labs. The other one represents a building with high occupancy variation and containing mainly lecture rooms and studios. This comparison of the results gives an idea of the different energy saving potential for different types of educational buildings. Principal component analysis is also adopted to investigate the detailed performance of one of the buildings which is influenced stronger by these retrofitting solutions.

  20. Design and testing of an independently controlled urea SCR retrofit system for the reduction of NOx emissions from marine diesels.

    Science.gov (United States)

    Johnson, Derek R; Bedick, Clinton R; Clark, Nigel N; McKain, David L

    2009-05-15

    Diesel engine emissions for on-road, stationary and marine applications are regulated in the United States via standards set by the Environmental Protection Agency (EPA). A major component of diesel exhaust that is difficult to reduce is nitrogen oxides (NOx). Selective catalytic reduction (SCR) has been in use for many years for stationary applications, including external combustion boilers, and is promising for NOx abatement as a retrofit for mobile applications where diesel compression ignition engines are used. The research presented in this paper is the first phase of a program focused on the reduction of NOx by use of a stand-alone urea injection system, applicable to marine diesel engines typical of work boats (e.g., tugs). Most current urea SCR systems communicate with engine controls to predict NOx emissions based on signals such as torque and engine speed, however many marine engines in use still employ mechanical injection technology and lack electronic communication abilities. The system developed and discussed in this paper controls NOx emissions independentof engine operating parameters and measures NOx and exhaust flow using the following exhaust sensor inputs: absolute pressure, differential pressure, temperature, and NOx concentration. These sensor inputs were integrated into an independent controller and open loop architecture to estimate the necessary amount of urea needed, and the controller uses pulse width modulation (PWM) to power an automotive fuel injector for airless urea delivery. The system was tested in a transient test cell on a 350 hp engine certified at 4 g/bhp-hr of NOx, with a goal of reducing the engine out NOx levels by 50%. NOx reduction capabilities of 41-67% were shown on the non road transient cycle (NRTC) and ICOMIA E5 steady state cycles with system optimization during testing to minimize the dilute ammonia slip to cycle averages of 5-7 ppm. The goal of 50% reduction of NOx can be achieved dependent upon cycle. Further

  1. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L. R.; Judd, R. A.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection. AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Five key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve cooperational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; plant display system; and digital protection system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance. (author). 8 refs., 3 figs

  2. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L.R.; Judd, R.A.; MacBeth, M.J.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection; AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve operational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; and plant display system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance

  3. Stereo Viewing System. Innovative Technology Summary Report

    International Nuclear Information System (INIS)

    None

    2000-01-01

    The Stereo Viewing System provides stereoscopic viewing of Light Duty Utility Arm activities. Stereoscopic viewing allows operators to see the depth of objects. This capability improves the control of the Light Duty Utility Arm performed in DOE's underground radioactive waste storage tanks and allows operators to evaluate the depth of pits, seams, and other anomalies. Potential applications include Light Duty Utility Arm deployment operations at the Oak Ridge Reservation, Hanford Site, and the Idaho National Engineering and Environmental Laboratory

  4. Retrofitting and operation solid radwaste system Dresden Station, Units 2 and 3

    International Nuclear Information System (INIS)

    Testa, J.; Homer, J.C.

    1982-01-01

    Units 2 and 3 at Dresden Station are twin 794 MW (net) BWR units that became operational in 1970 and 1971. The waste streams are typical of BWR stations, namely, bead resin and filter sludge (powdered resins and diatomaceous earth), evaporator concentrate containing approximately 25% dissolved solids and dry active waste. The original solid radwaste system utilized cement for solidification in open top 55 gallon drums. Remote handling was provided by means of a monorail with moving platforms supporting the drums. A relatively light-weight compactor was used to compact DAW into 55 gallon drums. Difficulties were experienced with this system

  5. Retrofit device and method to improve humidity control of vapor compression cooling systems

    Science.gov (United States)

    Roth, Robert Paul; Hahn, David C.; Scaringe, Robert P.

    2016-08-16

    A method and device for improving moisture removal capacity of a vapor compression system is disclosed. The vapor compression system is started up with the evaporator blower initially set to a high speed. A relative humidity in a return air stream is measured with the evaporator blower operating at the high speed. If the measured humidity is above the predetermined high relative humidity value, the evaporator blower speed is reduced from the initially set high speed to the lowest possible speed. The device is a control board connected with the blower and uses a predetermined change in measured relative humidity to control the blower motor speed.

  6. RekonFit - fit by reconstruction. Retrofitting of stall-controlled wind power systems; RekonFit - Fit durch Rekonstruktion. Verbesserungen fuer ihre stallgeregelte Windenergieanlage

    Energy Technology Data Exchange (ETDEWEB)

    Rosebrock, B. [RWE Piller GmbH, Osterode (Germany); Pfeiffer, K. [Erwin Peters GmbH, Hamburg (Germany)

    2004-07-01

    The improvements gained by retrofitting are summarized as follows: Reduction of servicing cost by abandoning terminal switching; reduction of loads on the powertrain and rotor blades; reduction of loads on electric components (main contactors and compensation); higher productivity as RekonFit MAF improves the overall productivity of stall-controlled wind power systems with terminal-switched asynchronous generators in low-wind operation; excellent function in low wind conditions with optimisation only in the lower stage (P

  7. Model-based assessment of retrofit strategies for the extension of a small district heating system

    NARCIS (Netherlands)

    Trân Quâc, C.K.V; Xu, L.; Torrens Galdiz, J.I.; Hensen, J.L.M.

    This contribution aims to investigate the viability of a district heating system (DHS) on the long-term, by studying a method to extend an existing DHS with new buildings while keeping the same generation and distribution facilities. The study is conducted by simulating the DHS. The models are

  8. Potential of ORC Systems to Retrofit CHP Plants in Wastewater Treatment Stations

    Directory of Open Access Journals (Sweden)

    Ricardo Chacartegui

    2013-12-01

    Full Text Available Wastewater treatment stations take advantage of the biogas produced from sludge in anaerobic digesters to generate electricity (reciprocating gas engines and heat (cooling water and engine exhaust gases. A fraction of this electricity is used to operate the plant while the remaining is sold to the grid. Heat is almost entirely used to support the endothermic anaerobic digestion and a minimum fraction of it is rejected to the environment at a set of fan coolers. This generic description is applicable to on-design conditions. Nevertheless, the operating conditions of the plant present a large seasonal variation so it is commonly found that the fraction of heat rejected to the atmosphere increases significantly at certain times of the year. Moreover, the heat available in the exhaust gases of the reciprocating engine is at a very high temperature (around 650 oC, which is far from the temperature at which heat is needed for the digestion of sludge (around 40 oC in the digesters. This temperature difference offers an opportunity to introduce an intermediate system between the engines and the digesters that makes use of a fraction of the available heat to convert it into electricity. An Organic Rankine Cycle (ORC with an appropriate working fluid is an adequate candidate for these hot/cold temperature sources. In this paper, the techno-economic effect of adding an Organic Rankine Cycle as the intermediate system of an existing wastewater treatment station is analysed. On this purpose, different working fluids and system layouts have been studied for a reference wastewater treatment station giving rise to optimal systems configurations. The proposed systems yield very promising results with regard to global efficiency and electricity production (thermodynamically and economically.

  9. Public building retrofit

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This report demonstrates the economic viability of cost effective, energy efficient retrofitting of a public building. The Whitehorse Chamber of Commerce in conjunction with the Canada/Yukon Conservation and Renewable Energy Demonstration Project undertook the demonstration project. The energy conservation features included increasing the insulation in the walls and ceiling, providing a 6 mm polyethylene air-vapour barrier and installing triple glazed windows on the north side. Also, an air-to-air heat exchanger and a combination wood/oil furnace were installed. However, neither of these latter features have been used since the completion of the renovations. In total, the features cost approximately $26,300. The energy conservation measures yielded less energy savings than expected. Although the T.C. Richard building is now consuming less heating oil (33% less); the amount of electricity used has increased by 146.6%. Overall the building achieved a 23% reduction in heating consumption (this figure takes into account the heat energy generated from the lighting system). Reasons for the low yield in energy savings can be attributed to the improper installation of the air-vapour barrier and not using the existing wood boiler. 1 fig. 5 tabs.

  10. Retrofit device to improve vapor compression cooling system performance by dynamic blower speed modulation

    Science.gov (United States)

    Roth, Robert Paul; Hahn, David C.; Scaringe, Robert P.

    2015-12-08

    A device and method are provided to improve performance of a vapor compression system using a retrofittable control board to start up the vapor compression system with the evaporator blower initially set to a high speed. A baseline evaporator operating temperature with the evaporator blower operating at the high speed is recorded, and then the device detects if a predetermined acceptable change in evaporator temperature has occurred. The evaporator blower speed is reduced from the initially set high speed as long as there is only a negligible change in the measured evaporator temperature and therefore a negligible difference in the compressor's power consumption so as to obtain a net increase in the Coefficient of Performance.

  11. Automated pipe handling systems for new and retrofit applications in shallow drilling markets

    Energy Technology Data Exchange (ETDEWEB)

    McDougall, P.; Fikowski, L.M. [Blackbird Well Servicing Inc., Calgary, AB (Canada)

    2003-07-01

    This presentation discussed the importance of the human interface as the main element in the development of automated mechanical systems on drilling rigs. Improvements in drilling rig designs are meant to improve manpower efficiencies and performance. The goal for Blackbird Well Servicing is to design automated and integrated processes that can be controlled manually at any point during an operation. Although some drilling operations can be fully automated and fully integrated, certain steps in the process are intentionally left open ended for human intervention. It was concluded that the consistency of performance is the most significant feature of integrated systems and that all drilling contractors should strive for smooth, steady performance rather than brute labour. Speed and efficiency increases with consistent performance. Reliability results in better performance, thereby lowering operating costs and more work for drilling contractors.

  12. Yuma Border Patrol Lighting Retrofit: Final LED System Performance Assessment of Trial and Full Installation

    Energy Technology Data Exchange (ETDEWEB)

    Andrea Wilkerson, Gregory P Sullivan, Robert G Davis, Sarah Safranek

    2018-04-30

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding the long-term performance of LED lighting systems in high-temperature environments.

  13. Smart CFRP systems for the controlled retrofitting of reinforced concrete members

    Science.gov (United States)

    Schaller, M.-B.; Käseberg, S.; Kuhne, M.

    2010-09-01

    During the last ten years an increasing amount of Carbon Fiber Reinforced Polymer (CFRP) applications to rehabilitate damaged concrete elements was observed. Thereby some important disadvantages of the brittle materials must be considered, for example the low ductility of the bond between CFRP and concrete and brittle failure of FRP. With embedded sensor systems it is possible to measure crack propagation and strains. In this paper a sensor based CFRP system will be presented, that can be used for strengthening and measuring. The used optical fibers with Fiber Bragg Gratings (FBG) have a large number of advantages in opposite to electrical measuring methods. Examples are small dimensions, low weight as well as high static and dynamic resolution of measured values. The main problem during the investigations was the fixing of the glass fiber and the small FBG at the designated position. In this paper the possibility of setting the glass fiber with embroidery at the reinforcing fiber material will be presented. On the basis of four point bending tests on beams (dimensions of 700 x 150 x 150 mm) and tests on wrapped columns the potential of the Smart CFRP system is introduced.

  14. Fatigue Assessment of Full-Scale Retrofitted Orthotropic Bridge Decks

    NARCIS (Netherlands)

    Teixeira De Freitas, S.; Kolstein, M.H.; Bijlaard, F.S.K.

    2017-01-01

    Full-scale fatigue tests were performed on two retrofitted orthotropic bridge decks (OBDs). The retrofitting systems consist of adding a second steel plate on the top of the existing deck. The aim is to reduce the stresses at the fatigue-sensitive details and therefore extend the fatigue life of

  15. How Justice System Officials View Wrongful Convictions

    Science.gov (United States)

    Smith, Brad; Zalman, Marvin; Kiger, Angie

    2011-01-01

    The wrongful conviction of factually innocent people is a growing concern within the United States. Reforms generated by this concern are predicated in part on the views of justice system participants. The authors surveyed judges, police officials, prosecutors, and defense lawyers in Michigan regarding their views of why wrongful convictions…

  16. Management of nuclear retrofit

    International Nuclear Information System (INIS)

    Nanda, D.

    1981-01-01

    Inherently, the retrofit work is more complex than the construction of a new project. The major factors that contribute to the complexity are: operational plant, NRC Requirements, documentation requirements, problems with the existing documentation, changing scope of work and short implementation schedules. A good understanding of the nature of the work is essential for its management. A few of the factors to be considered in the management of the work are: understanding of the retrofit work by the management, an overall management philosophy for the execution of the projects, direct access to the top management, detailed planning, close monitoring, segregation of the outage work and close coordination between the various project groups

  17. Retrofit of a high power Nd:glass laser system with liquid crystal polarizers

    International Nuclear Information System (INIS)

    Jacobs, S.D.; Cerqua, K.A.; Kessler, T.J.; Seka, W.; Bahr, R.

    1985-03-01

    The glass development laser (GDL), has been operating at the Laboratory for Laser Energetics since 1978. This Nd:phosphate glass system produces high peak power optical radiation at lambda = 1054 nm or lambda = 351 nm for use in studying the interaction physics of intense laser beams with matter. The amplifier staging incorporates the propagation of linearly and circularly polarized light in rod amplifiers which vary in diameter from 16 mm to 90 mm. Numerous quartz or mica quarter waveplates and Brewster angle dielectric thin film polarizers are required to limit accumulated phase retardation between amplification stages and to accommodate interstage Pockels' cell isolation switches. We have recently replaced most of the waveplate-dielectric polarizer combinations in GDL with liquid crystal polarizers. Comprised of 11 μm thick cholesteric fluids sandwiched between optical quality glass plates, liquid crystal polarizers provide excellent polarization properties, low insertion loss, angular insensitivity, and laser damage resistance at lambda = 1054 nm. The design, fabrication, and performance of left-handed and right-handed circular polarizers will be discussed

  18. Retrofitting bus fleet for natural gas operation

    International Nuclear Information System (INIS)

    Stella, E.; Foresti, P.

    1992-01-01

    Buses, operating within a Florence (Italy) municipal transportation system, and equipped with Otto cycle engines, were selected for retrofitting taking into account the suitability of each vehicle's specific routing and service requirements. Cost benefit analyses indicated that it wouldn't be economically feasible to retrofit buses equipped with diesel engines. A computerized refuelling system was set up at the fleet's central service station which was hooked up to the natural gas utility's supply line. This paper tables the cost benefit analysis data comparing gasoline and methane operation and reflecting the cost savings which are expected to be accrued through this methanization program over a span of 14 years

  19. New views of the solar system

    CERN Document Server

    2009-01-01

    Is your library up to date on the Solar System? When the International Astronomical Union redefined the term "planet," Pluto was stripped of its designation as the solar system''s ninth planet. New Views of the Solar System looks at scientists'' changing perspectives on the solar system, with articles on Pluto, the eight chief planets, and dwarf planets. Brilliant photos and drawings showcase the planets, asteroids, comets, and more, providing a stunning collection of vivid and detailed images of the solar system.

  20. Motel DHW Retrofit--Dallas, Texas

    Science.gov (United States)

    1982-01-01

    Solar-energy system designed to provide 65% of total domestic-hot-water (DHW) demands for 100-room motel in Dallas, Texas is subject of a report now available. System is retrofit, and storage-tank size was limited to 1,000 gallons (3,785 1) by size of room where it is located.

  1. Underwater Adhesives Retrofit Pipelines with Advanced Sensors

    Science.gov (United States)

    2015-01-01

    Houston-based Astro Technology Inc. used a partnership with Johnson Space Center to pioneer an advanced fiber-optic monitoring system for offshore oil pipelines. The company's underwater adhesives allow it to retrofit older deepwater systems in order to measure pressure, temperature, strain, and flow properties, giving energy companies crucial data in real time and significantly decreasing the risk of a catastrophe.

  2. Guild Hall retrofit

    Energy Technology Data Exchange (ETDEWEB)

    1984-08-01

    This report demonstrates the economic viability of an exterior rewrap retrofit performed on a public community facility for the performing arts. This facility originally consisted of two mess halls built by the American army. The exterior retrofit consisted of constructing a super-insulated passageway to link the two halls as well as completely wrapping the facility with six millimetre polyethylene to provide an airtight barrier. The roofs and walls were reinsulated and insulation levels were increased to RSI 10.5 in the ceilings and RSI 7.7 in the walls. The installation of a propane fuelled furnace was also included in the retrofit package. Prior to the renovations and retrofitting, the Guild Hall facility was almost unusable. The demonstration project transformed the cold, drafty buildings into an attractive, comfortable and functional centre for the performing arts. Heating requirements have been reduced to 500 MJ/m {sup 2} of floor space annually compared to a predicted 1,760 MJ/m{sup 2} of floor space based on HOTCAN analysis of the heating requirements without the energy conservation measures. 9 figs., 10 tabs.

  3. District heating and cooling systems for communities through power-plant retrofit and distribution network. Volume 2. Tasks 1-3. Final report. [Downtown Toledo steam system

    Energy Technology Data Exchange (ETDEWEB)

    Watt, J.R.; Sommerfield, G.A.

    1979-08-01

    Each of the tasks is described separately: Task 1 - Demonstration Team; Task 2 - Identify Thermal Energy Source(s) and Potential Service Area(s); and Task 3 - Energy Market Analysis. The purpose of the project is to establish and implement measures in the downtown Toledo steam system for conserving scarce fuel supplies through cogeneration, by retrofit of existing base- or intermediate-loaded electric-generating plants to provide for central heating and cooling systems, with the ultimate purpose of applying the results to other communities. For Task 1, Toledo Edison Company has organized a Demonstration Team (Battelle Columbus Laboratories; Stone and Webster; Ohio Dept. of Energy; Public Utilities Commission of Ohio; Toledo Metropolitan Area Council of Governments; and Toledo Edison) that it hopes has the expertise to evaluate the technical, legal, economic, and marketing issues related to the utilization of by-product heat from power generation to supply district heating and cooling services. Task 2 gives a complete technical description of the candidate plant(s), its thermodynamic cycle, role in load dispatch, ownership, and location. It is concluded that the Toledo steam distribution system can be the starting point for developing a new district-heating system to serve an expanding market. Battelle is a member of the team employed as a subcontractor to complete the energy market analysis. The work is summarized in Task 3. (MCW)

  4. Variable acuity remote viewing system flight demonstration

    Science.gov (United States)

    Fisher, R. W.

    1983-01-01

    The Variable Acuity Remote Viewing System (VARVS), originally developed under contract to the Navy (ONR) as a laboratory brassboard, was modified for flight demonstration. The VARVS system was originally conceived as a technique which could circumvent the acuity/field of view/bandwidth tradeoffs that exists in remote viewing to provide a nearly eye limited display in both field of view (160 deg) and resolution (2 min arc) while utilizing conventional TV sensing, transmission, and display equipment. The modifications for flight demonstration consisted of modifying the sensor so it could be installed and flow in a Piper PA20 aircraft, equipped for remote control and modifying the display equipment so it could be integrated with the NASA Research RPB (RPRV) remote control cockpit.

  5. Distributed Access View Integrated Database (DAVID) system

    Science.gov (United States)

    Jacobs, Barry E.

    1991-01-01

    The Distributed Access View Integrated Database (DAVID) System, which was adopted by the Astrophysics Division for their Astrophysics Data System, is a solution to the system heterogeneity problem. The heterogeneous components of the Astrophysics problem is outlined. The Library and Library Consortium levels of the DAVID approach are described. The 'books' and 'kits' level is discussed. The Universal Object Typer Management System level is described. The relation of the DAVID project with the Small Business Innovative Research (SBIR) program is explained.

  6. Modified ITER In-Vessel Viewing System

    International Nuclear Information System (INIS)

    Ahola, H.; Heikkinen, V.; Keraenen, K.; Suomela, J.

    2001-01-01

    The original ITER In-Vessel Viewing System (IVVS) prototype (Proc. of the 20th SOFT, vol. 2 (1998) 1051), which demonstrates the feasibility of linear fibre arrays for ITER in-vessel viewing, has been modified. In order to reduce the viewing time and to improve the image quality the beam dispersing mirrors was replaced by a diffractive optics element (DOE), which enhanced the laser illumination considerably. The performance of the system was tested using various target surfaces: the results obtained clearly indicate its adequacy for in-vessel viewing. Mechanical damage on smooth metal surfaces (scratches etc.) can be easily distinguished and the viewing resolution at a distance of 2 m is better than 1 mm. The IVVS has been re-designed to be compatible with the new ITER-FEAT. A conceptual study which covers all the functions and subsystems required for viewing has been completed. These results will be used to further modify the prototype: items to be tested include horizontal probe operation and laser illumination with an optical fibre

  7. Deep Energy Retrofit

    DEFF Research Database (Denmark)

    Zhivov, Alexander; Lohse, Rüdiger; Rose, Jørgen

    Deep Energy Retrofit – A Guide to Achieving Significant Energy User Reduction with Major Renovation Projects contains recommendations for characteristics of some of core technologies and measures that are based on studies conducted by national teams associated with the International Energy Agency...... Energy Conservation in Buildings and Communities Program (IEA-EBC) Annex 61 (Lohse et al. 2016, Case, et al. 2016, Rose et al. 2016, Yao, et al. 2016, Dake 2014, Stankevica et al. 2016, Kiatreungwattana 2014). Results of these studies provided a base for setting minimum requirements to the building...... envelope-related technologies to make Deep Energy Retrofit feasible and, in many situations, cost effective. Use of energy efficiency measures (EEMs) in addition to core technologies bundle and high-efficiency appliances will foster further energy use reduction. This Guide also provides best practice...

  8. Retrofitting models of inflation

    International Nuclear Information System (INIS)

    Kain, Ben

    2009-01-01

    I use the method of retrofitting, developed by Dine, Feng and Silverstein, to generate the scale of inflation dynamically, allowing it to be naturally small. This is a general procedure that may be performed on existing models of supersymmetric inflation. I illustrate this idea on two such models, one an example of F-term inflation and the other an example of D-term inflation.

  9. Retrofit Best Practices Guide

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, T.K.

    2004-01-13

    Few people add siding or change their windows just to reduce their energy bills. But whatever your reasons for retrofitting your home, this will be an important opportunity to improve your home's energy efficiency. Not only will this reduce your utility bills, it will also improve your comfort level and improve our environment. Retrofitting your house is a big deal, and you shouldn't underestimate the effort that will be required to plan the job properly. The energy conservation rewards can be great, but there are also pitfalls that you'll want to avoid. That's what this Best Practices Guide is all about. We can't cover all the issues in these few pages, but we'll tell you some things you need to know if you're changing your siding or windows, and tell you where to learn more about other changes you may want to make to your house. What exactly is a ''best practice''? To put this guide together, we've tested products, talked to contractors and manufacturers, and reviewed the results from a large number of house retrofits. Of course, ''best'' will vary according to the situation. That's why you must start with a careful examination of your house and its existing condition.

  10. Best practices guide for residential HVAC Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Iain S.

    2003-08-11

    This best practices guide for residential HVAC system retrofits is aimed at contractors who want guidance on delivering energy efficient, cost effective and innovative products. It has been developed around the idea of having packages of changes to the building HVAC system and building envelope that are climate and house construction dependent. These packages include materials, procedures and equipment and are designed to remove some of the guesswork from a builder, contractor, installer or homeowner decisions about how best to carry out HVAC changes. The packages are not meant to be taken as rigid requirements--instead they are systems engineered guidelines that form the basis for energy efficient retrofits. Similar approaches have been taken previously for new construction to develop extremely energy efficient homes that are comfortable safe and durable, and often cost less than standard construction. This is best epitomized by the Building America program whose partners have built thousands of residences throughout the U.S. using these principles. The differences between retrofitting and new construction tend to limit the changes one can make to a building, so these packages rely on relatively simple and non-intrusive technologies and techniques. The retrofits also focus on changes to a building that will give many years of service to the occupants. Another key aspect of these best practices is that we need to know how a house is working so that we know what parts have the potential for improvement. To do this we have put together a set of diagnostic tools that combine physical measurements and checklists/questionnaires. The measured test results, observations and homeowner answers to questions are used to direct us towards the best retrofits applicable to each individual house. The retrofits will depend on the current condition of the building envelope and HVAC system, the local climate, the construction methods used for the house, and the presence of various

  11. Evaluation of Retrofit Delivery Packages

    Energy Technology Data Exchange (ETDEWEB)

    Berman, M.; Smith, P.; Porse, E.

    2013-07-01

    Residential energy retrofit activities are a critical component of efforts to increase energy efficiency in the U.S. building stock; however, retrofits account for a small percentage of aggregate energy savings at relatively high per unit costs. This report by Building America research team, Alliance for Residential Building Innovation (ARBI), describes barriers to widespread retrofits and evaluates opportunities to improve delivery of home retrofit measures by identifying economies of scale in marketing, energy assessments, and bulk purchasing through pilot programs in portions of Sonoma, Los Angeles, and San Joaquin Counties, CA. These targeted communities show potential and have revealed key strategies for program design, as outlined in the report.

  12. District heating and cooling systems for communities through power plant retrofit distribution network. Final report, September 1, 1978-May 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This Final Report (Volume 2) of Phase 1 of District Heating for Communities Through Power Plant Retrofit Distribution Network contains 3 tasks: (1) Demonstration Team; (2) Identify Thermal Energy Sources and Potential Service Areas; and (3) Energy Market Analysis. Task 2 consists of estimating the thermal load within 5 and 10 miles of Public Service Electric and Gas Company steam power plants, Newark, New Jersey; estimating the costs of supplying thermal services to thermal loads of varying densities; a best case economic analysis of district heating for single-family homes; and some general comments on district-heating system design and development. Task 3 established the potential market for district heating that exists within a 5-mile radius of the selected generating stations; a sample of the questionnaire sent to the customers are shown. (MCW)

  13. Depth Perception In Remote Stereoscopic Viewing Systems

    Science.gov (United States)

    Diner, Daniel B.; Von Sydow, Marika

    1989-01-01

    Report describes theoretical and experimental studies of perception of depth by human operators through stereoscopic video systems. Purpose of such studies to optimize dual-camera configurations used to view workspaces of remote manipulators at distances of 1 to 3 m from cameras. According to analysis, static stereoscopic depth distortion decreased, without decreasing stereoscopitc depth resolution, by increasing camera-to-object and intercamera distances and camera focal length. Further predicts dynamic stereoscopic depth distortion reduced by rotating cameras around center of circle passing through point of convergence of viewing axes and first nodal points of two camera lenses.

  14. Check and evaluation system on heat metering and energy efficiency retrofit of existing residential buildings in northern heating areas of china based on multi-index comprehensive evaluation method

    International Nuclear Information System (INIS)

    Zhao Jing; Wu Yong; Zhu Neng

    2009-01-01

    Heat metering and energy efficiency retrofit of existing residential buildings in northern heating areas of China is organized and implemented in a large scale by local government in 15 provinces of North China with the unified guidance and control of central government. Firstly, this paper introduced the target of energy-saving reformation of existing residential buildings in North China and the importance of check and evaluation on this target, then pointed out the necessity of building up an evaluation system for energy-saving retrofit. According to the analytical hierarchy process (AHP), three-grade evaluation system was built up for heat metering and energy efficiency retrofit of existing residential buildings in northern heating areas of China. Also, based on multi-index comprehensive evaluation method combined with life cycle assessment (LCA) theory, post-evaluation thought and successful degree evaluation method, a mathematical model was established. Finally, a set of scientific method for evaluating heat metering and energy efficiency retrofit of existing residential buildings in northern heating areas of China systematically, scientifically, comprehensively and objectively was created.

  15. New views of the solar system

    CERN Document Server

    2010-01-01

    Are you up to date on the solar system? When the International Astronomical Union redefined the term ""planet,"" Pluto was downgraded to a lower status. New Views of the Solar System looks at scientists' changing perspectives, with articles on Pluto, the eight chief planets, and dwarf planets. Brilliant photos and drawings showcase the planets, asteroids, comets, and more, providing a stunning collection of vivid images.

  16. New views of the solar system

    CERN Document Server

    2013-01-01

    Are you up to date on the solar system?  When the International Astronomical Union redefined the term ""planet,"" Pluto was downgraded to a lower status. New Views of the Solar System 2013 looks at scientists' changing perspectives, with articles on Pluto, the eight chief planets, and dwarf planets, new missions, updates for ongoing missions, newly-discovered moons, and updated tables. Brilliant photos and drawings showcase the planets, asteroids, comets, and more, providing a stunning collection of vivid images.

  17. Retrofit designs for small bench-type blood cell counters.

    Science.gov (United States)

    Ferris, C D

    1991-01-01

    This paper describes several retrofit designs to correct operational problems associated with small bench-type blood cell counters. Replacement electronic circuits as well as modifications to the vacuum systems are discussed.

  18. View Estimation Based on Value System

    Science.gov (United States)

    Takahashi, Yasutake; Shimada, Kouki; Asada, Minoru

    Estimation of a caregiver's view is one of the most important capabilities for a child to understand the behavior demonstrated by the caregiver, that is, to infer the intention of behavior and/or to learn the observed behavior efficiently. We hypothesize that the child develops this ability in the same way as behavior learning motivated by an intrinsic reward, that is, he/she updates the model of the estimated view of his/her own during the behavior imitated from the observation of the behavior demonstrated by the caregiver based on minimizing the estimation error of the reward during the behavior. From this view, this paper shows a method for acquiring such a capability based on a value system from which values can be obtained by reinforcement learning. The parameters of the view estimation are updated based on the temporal difference error (hereafter TD error: estimation error of the state value), analogous to the way such that the parameters of the state value of the behavior are updated based on the TD error. Experiments with simple humanoid robots show the validity of the method, and the developmental process parallel to young children's estimation of its own view during the imitation of the observed behavior of the caregiver is discussed.

  19. Digital controls for plant control systems at the Ulchin 5 and 6 NPP: Lessons for the U.S. NPP retrofits?

    International Nuclear Information System (INIS)

    McCreary, T.; Stevens, J.

    2006-01-01

    South Korea, through its nuclear operating arm, Korea Hydro and Nuclear Power, Ltd. (KHNP), has been one of the leading countries in the routine construction and operation of nuclear power plants. While standardizing on certain design approaches in the plant, KHNP continues to stress the need for the most reliable and cutting edge I and C technologies available for safety and non safety related NSSS and BOP functions. Its specifications are among the most challenging in the world with regard to the system performance and reliability requirements that must be met for the systems to be supplied. The Ulchin Units 5 and 6 (1000 MW each) nuclear power plants have been recently commissioned (2004 and 2005 respectively) with advanced programmable digital control systems in the NSSS and BOP (which includes both safety and non-safety applications). The systems supplied met what the authors believe are the most rigorous performance and functional specification criteria in use today. The authors will highlight a number of the specification requirements, the rationale for same and the plant experiences in the resultant supplied systems. As the existing U.S. nuclear fleet is faced with the prospect of upgrading legacy controls with digital controls, there are valuable lessons to be learned in the Ulchin 5 and 6 experiences that can be applied to retrofits and even new U.S. plant designs. Ulchin 5 and 6 is one of the success stories in the application of advanced digital technology to nuclear power plants. The specification focus that guided the selection and project execution for the digital controls supplied for Ulchin was on several key areas: a) a high reliable fault tolerant system, b)functional segmentation to minimize the failure effects on operation, c) validation and verification of the owner's engineer's application design (for regulatory compliance) as well as validation and verification of the system architecture and operation (to assure system performance met

  20. BAMUD Features Demonstration by System View

    Directory of Open Access Journals (Sweden)

    D. Kocur

    2004-09-01

    Full Text Available Direct-sequence code-division multiple access (DS-CDMA is afrequently used wireless technology in DS-CDMA communications. Theconventional DS-CDMA detector follows a single-user detection strategyin which each user is detected separately without regard for the otherusers. The better strategy is multi-user detection (MUD, whereinformation about multiple users is used to improve detection of eachindividual user. This paper presents an adaptive multi-user detectorconverging (for any initialization to the minimum mean square error(MMSE detector without requiring training sequences. This blindmulti-user detector (BAMUD requires no more knowledge than does theconventional single-user detector. The structure of adaptive blinddetector is simulated by the system design tool SystemView. The aimfocus is to verify theoretical knowledge of BAMUD structure usinghardware-oriented PC-based model in SystemView.

  1. Retrofit design of rice husk feeding system in the production of amorphous silica ash in a pilot scale fluidized bed combustor

    International Nuclear Information System (INIS)

    Abdul, A.; Rozainee, M.; Anwar, J.; Wan Alwi, R.S.

    2010-01-01

    Full text: Rice husk is among the most important recovery resources for silica that is produced annually in huge quantities in many countries such as Malaysia which produces 2.38 (MT) of rice paddy. Rice husks accounts for 14-35 % of the weight of the paddy harvested, depending on the paddy variety and because of its abundance it poses serious environmental problems in the rice producing countries. Therefore, the thermo-chemical conversion of rice husks to useful silica ash by fluidized bed combustion is the proven and cost-effective technology for converting the renewable waste husks by making commercial use of this rice husk ash because of its self sustaining ability. However, feeding of rice husk into the reactor bed has become a difficult problem hindering the production of amorphous silica. This is due to the poor penetration and low bulk density as well as the flaky, abrasive and joined nature of rice husk. Most of the researches into fluidized bed combustion are on laboratory or bench scale and none had discussed pilot scale combustion of rice husk into amorphous silica. A recent attempt to solve this feeding problem from an experimental investigation in a bench-scale culminates into a pilot-scale fluidized bed combustor designed with a combined screw conveyor and an inclined pneumatic feeding by direct injection, yet the problem persists. This paper presents a retrofit design of the existing 0.5 m internal diameter pilot scale fluidized bed combustor by the use of combined screw feeding system. It is envisaged that at the end of the experimental investigation the retrofit design will address the problem associated with rice husk feeding in bubbling fluidized bed combustors. (author)

  2. Cochlear implant magnet retrofit.

    Science.gov (United States)

    Cohen, N L; Breda, S D; Hoffman, R A

    1988-06-01

    An implantable magnet is now available for patients who have received the standard Nucleus 22-channel cochlear implant and who are not able to wear the headband satisfactorily. This magnet is attached in piggy-back fashion to the previously implanted receiver/stimulator by means of a brief operation under local anesthesia. Two patients have received this magnet retrofit, and are now wearing the headset with greater comfort and satisfaction. It is felt that the availability of this magnet will increase patient compliance in regard to hours of implant usage.

  3. Recent digital control and protection retrofits in power plants

    International Nuclear Information System (INIS)

    Fournier, R.D.; Hammer, M.; Smith, J.E.

    1987-01-01

    Digital computers are now being retrofitted to all types of power plants, replacing analog equipment and solving problems such as equipment obsolescence and low reliability. Three diverse examples of retrofits are presented in this paper, representing trends in man/machine interface design at an oil-fired plant, protection system in pressurized heavy-water reactors, and control systems in light water reactors (LWRs). The examples have been chosen to illustrate diverse reasons for the retrofits and the benefits derived. The cases presented report retrofits at Northern States Power's Monticello boiling water reactor, New Brunswick Electric Power Commission's (NBEPC's) Point Lepreau Nuclear Generating Station, and finally NBEPC's oil-fired plant at Courtney Bay

  4. Remote viewing system development in BNFL

    International Nuclear Information System (INIS)

    Case, D.R.; Garlick, D.R.; Crawford, G.; Montgomerie, J.

    1996-01-01

    The application of imaging systems to BNFL's plants is primarily provided by the Company's Engineering Group. Many systems have been developed for active service and several new developments are currently in an advanced stage of implementation. BNFL has acquired extensive experience of remote viewing from a series of projects undertaken for the Sellafield site in West Cumbria. Applications vary in size and complexity, from simple identification of bar-codes to more complex schemes for remotely storing UO 3 drums. Some are high speed and highly repetitive, whereas others are low speed but require high precision. In this paper the authors outline a selection of current applications. (UK)

  5. Remote viewing system development in BNFL

    International Nuclear Information System (INIS)

    Case, D.R.; Garlick, D.R.; Crawford, G.; Montgomerie, J.

    1996-01-01

    The application of imaging systems to BNFL's plants is primarily provided by the Company's Engineering Group. Many systems have been developed for active service and several new developments are currently in an advanced stage of implementation. BNFL has acquired extensive experience of remote viewing from a series of projects undertaken for the Sellafield site in West Cumbria. Applications vary in size and complexity, from simple identification of bar-codes to more complex schemes for remotely storing UO 3 drums. Some are high speed and highly repetitive, whereas others are low speed but require high precision. In this paper the authors shall outline a selection of current applications. (Author)

  6. A view to the new safeguards system

    International Nuclear Information System (INIS)

    Tsuboi, Hiroshi

    2000-01-01

    The Additional Protocol to the Safeguards Agreement between Japan and the IAEA entered into force on 16 December 1999. An initial declaration of the expanded information will be provided to the IAEA by next June in accordance with the Additional Protocol. In Japan the new integrated safeguards system, which strengthens the effectiveness and improves efficiency of IAEA Safeguards, is considered to be very important issue. The establishment of a permanent and universal safeguards system including application of safeguards in Nuclear Weapon States also is an important issue from the view-point of not only non-proliferation but also nuclear disarmament. Safeguards are expected to have an increasingly important role. (author)

  7. Retrofit of a Multifamily Mass Masonry Building in New England

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K.; Kerrigan, P.; Wytrykowska, H.; Van Straaten, R.

    2013-08-01

    Merrimack Valley Habitat for Humanity (MVHfH) has partnered with Building Science Corporation to provide high performance affordable housing for 10 families in the retrofit of an existing brick building (a former convent) into condominiums. The research performed for this project provides information regarding advanced retrofit packages for multi-family masonry buildings in Cold climates. In particular, this project demonstrates safe, durable, and cost-effective solutions that will potentially benefit millions of multi-family brick buildings throughout the East Coast and Midwest (Cold climates). The retrofit packages provide insight on the opportunities for and constraints on retrofitting multifamily buildings with ambitious energy performance goals but a limited budget. The condominium conversion project will contribute to several areas of research on enclosures, space conditioning, and water heating. Enclosure items include insulation of mass masonry building on the interior, airtightness of these types of retrofits, multi-unit building compartmentalization, window selection, and roof insulation strategies. Mechanical system items include combined hydronic and space heating systems with hydronic distribution in small (low load) units, and ventilation system retrofits for multifamily buildings.

  8. Wyandotte Neighborhood Stabilization Program: Retrofit of Two Homes

    Energy Technology Data Exchange (ETDEWEB)

    Lukachko, A.; Grin, A.; Bergey, D.

    2013-04-01

    The Wyandotte NSP2 project aims to build 20 new houses and retrofit 20 existing houses in Wyandotte, MI. This report will detail the retrofit of 2 existing houses in the program. Wyandotte is part of a Michigan State Housing Development Authority-led consortium that is funded by HUD under the NSP2 program. The City of Wyandotte has also been awarded DOE EE&CBG funds that are being used to develop a district GSHP system to service the project. This draft report examines the energy efficiency recommendations for retrofit construction at these homes. The report will be of interest to anyone planning an affordable, high performance retrofit of an existing home in a Cold Climate zone. Information from this report will also be useful to retrofit or weatherization program staff as some of the proposed retrofit solutions will apply to a wide range of projects. Preliminary results from the first complete house suggest that the technology package employed (which includes spray foam insulation and insulating sheathing) does meet the specific whole house water, air, and thermal control requirements, as well as, the project's affordability goals. Monitoring of the GSHP system has been recommended and analysis of this information is not yet available.

  9. High-Efficiency Retrofit Lessons for Retail from a SuperTarget: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Langner, R.; Deru, M.; Hirsch, A.; Williams, S.

    2013-02-01

    The National Renewable Energy Laboratory partnered with Target under the Commercial Building Program to design and implement a retrofit of a SuperTarget in Thornton, CO. The result was a retrofit design that predicted 37% energy savings over ASHRAE Standard 90.1-2004, and 29% compared to existing (pre-retrofit) store consumption. The largest savings came from energy efficient lighting, energy efficient cooling systems, improved refrigeration, and better control of plug loads.

  10. Byggmeister Test Home. Analysis and Initial Results of Cold Climate Wood-Framed Home Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    Gates, C. [Building Science Corporation (BSC), Somerville, MA (United States)

    2013-01-01

    BSC seeks to further the energy efficiency market for New England area retrofit projects by supporting projects that are based on solid building science fundamentals that will benefit the homeowner through a combination of energy savings, improved durability, and occupant comfort. This report describes a deep retrofit project of a two-family wood-framed home in Belmont, Massachusetts, and examines the retrofit measures for the enclosure amd mechanical systems and reviews the decision-making process that took place during planning.

  11. Jelly Views : Extending Relational Database Systems Toward Deductive Database Systems

    Directory of Open Access Journals (Sweden)

    Igor Wojnicki

    2004-01-01

    Full Text Available This paper regards the Jelly View technology, which provides a new, practical methodology for knowledge decomposition, storage, and retrieval within Relational Database Management Systems (RDBMS. Intensional Knowledge clauses (rules are decomposed and stored in the RDBMS founding reusable components. The results of the rule-based processing are visible as regular views, accessible through SQL. From the end-user point of view the processing capability becomes unlimited (arbitrarily complex queries can be constructed using Intensional Knowledge, while the most external queries are expressed with standard SQL. The RDBMS functionality becomes extended toward that of the Deductive Databases

  12. Interactive computer-enhanced remote viewing system

    International Nuclear Information System (INIS)

    Tourtellott, J.A.; Wagner, J.F.

    1995-01-01

    Remediation activities such as decontamination and decommissioning (D ampersand D) typically involve materials and activities hazardous to humans. Robots are an attractive way to conduct such remediation, but for efficiency they need a good three-dimensional (3-D) computer model of the task space where they are to function. This model can be created from engineering plans and architectural drawings and from empirical data gathered by various sensors at the site. The model is used to plan robotic tasks and verify that selected paths are clear of obstacles. This report describes the development of an Interactive Computer-Enhanced Remote Viewing System (ICERVS), a software system to provide a reliable geometric description of a robotic task space, and enable robotic remediation to be conducted more effectively and more economically

  13. Interactive computer-enhanced remote viewing system

    Energy Technology Data Exchange (ETDEWEB)

    Tourtellott, J.A.; Wagner, J.F. [Mechanical Technology Incorporated, Latham, NY (United States)

    1995-10-01

    Remediation activities such as decontamination and decommissioning (D&D) typically involve materials and activities hazardous to humans. Robots are an attractive way to conduct such remediation, but for efficiency they need a good three-dimensional (3-D) computer model of the task space where they are to function. This model can be created from engineering plans and architectural drawings and from empirical data gathered by various sensors at the site. The model is used to plan robotic tasks and verify that selected paths are clear of obstacles. This report describes the development of an Interactive Computer-Enhanced Remote Viewing System (ICERVS), a software system to provide a reliable geometric description of a robotic task space, and enable robotic remediation to be conducted more effectively and more economically.

  14. Advancing Residential Retrofits in Atlanta

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Roderick K [ORNL; Kim, Eyu-Jin [Southface Energy Institute; Roberts, Sydney [Southface Energy Institute; Stephenson, Robert [Southface Energy Institute

    2012-07-01

    This report will summarize the home energy improvements performed in the Atlanta, GA area. In total, nine homes were retrofitted with eight of the homes having predicted source energy savings of approximately 30% or greater based on simulated energy consumption.

  15. Retrofitting for fossil fuel flexibility

    International Nuclear Information System (INIS)

    Newell, J.; Trueblood, R.C.; Lukas, R.W.; Worster, C.M.; Marx, P.D.

    1991-01-01

    Described in this paper are two fossil plant retrofits recently completed by the Public Service Company of New Hampshire that demonstrate the type of planning and execution required for a successful project under the current regulatory and budget constraints. Merrimack Units 1 and 2 are 120 MW and 338 MW nominal cyclone-fired coal units in Bow, New Hampshire. The retrofits recently completed at these plants have resulted in improved particulate emissions compliance, and the fuel flexibility to allow switching to lower sulphur coals to meet current and future SO 2 emission limits. Included in this discussion are the features of each project including the unique precipitator procurement approach for the Unit 1 Retrofit, and methods used to accomplish both retrofits within existing scheduled maintenance outages through careful planning and scheduling, effective use of pre-outage construction, 3-D CADD modeling, modular construction and early procurement. Operating experience while firing various coals in the cyclone fired boilers is also discussed

  16. Short-Term Test Results. Transitional Housing Energy Efficiency Retrofit in the Hot Humid Climate

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [BA-PIRC/Florida Solar Energy Center, Cocoa, FL (United States); Martin, Eric [BA-PIRC/Florida Solar Energy Center, Cocoa, FL (United States)

    2013-02-01

    This project evaluates the renovation of a 5,800 ft2, multi-use facility located in St. Petersburg, on the west coast of central Florida, in the hot humid climate. An optimal package of retrofit measures was designed to deliver 30%-40% annual energy cost savings for this building with annual utility bills exceeding $16,000 and high base load consumption. Researchers projected energy cost savings for potential retrofit measures based on pre-retrofit findings and disaggregated, weather normalized utility bills as a basis for simulation true-up. A cost-benefit analysis was conducted for the seven retrofit measures implemented; adding attic insulation and sealing soffits, tinting windows, improving whole building air-tightness, upgrading heating and cooling systems and retrofitting the air distribution system, replacing water heating systems, retrofitting lighting, and replacing laundry equipment. The projected energy cost savings for the full retrofit package based on a post-retrofit audit is 35%. The building's architectural characteristics, vintage, and residential and commercial uses presented challenges for both economic projections and retrofit measure construction.

  17. Short-Term Test Results: Transitional Housing Energy Efficiency Retrofit in the Hot-Humid Climate

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K.; Martin, E.

    2013-02-01

    This project evaluates the renovation of a 5,800 ft2, multi-use facility located in St. Petersburg, on the west coast of central Florida, in the hot humid climate. An optimal package of retrofit measures was designed to deliver 30-40% annual energy cost savings for this building with annual utility bills exceeding $16,000 and high base load consumption. Researchers projected energy cost savings for potential retrofit measures based on pre-retrofit findings and disaggregated, weather normalized utility bills as a basis for simulation true-up. A cost-benefit analysis was conducted for the seven retrofit measures implemented; adding attic insulation and sealing soffits, tinting windows, improving whole building air-tightness, upgrading heating and cooling systems and retrofitting the air distribution system, replacing water heating systems, retrofitting lighting, and replacing laundry equipment. The projected energy cost savings for the full retrofit package based on a post-retrofit audit is 35%. The building's architectural characteristics, vintage, and residential and commercial uses presented challenges for both economic projections and retrofit measure construction.

  18. Interactive computer-enhanced remote viewing system

    International Nuclear Information System (INIS)

    Tourtellott, J.A.; Wagner, J.F.

    1995-01-01

    Remediation activities such as decontamination and decommissioning (D ampersand D) typically involve materials and activities hazardous to humans. Robots are an attractive way to conduct such remediation, but for efficiency they need a good three-dimensional (3-D) computer model of the task space where they are to function. This model can be created from engineering plans and architectural drawings and from empirical data gathered by various sensors at the site. The model is used to plan robotic tasks and verify that selected paths am clear of obstacles. This need for a task space model is most pronounced in the remediation of obsolete production facilities and underground storage tanks. Production facilities at many sites contain compact process machinery and systems that were used to produce weapons grade material. For many such systems, a complex maze of pipes (with potentially dangerous contents) must be removed, and this represents a significant D ampersand D challenge. In an analogous way, the underground storage tanks at sites such as Hanford represent a challenge because of their limited entry and the tumbled profusion of in-tank hardware. In response to this need, the Interactive Computer-Enhanced Remote Viewing System (ICERVS) is being designed as a software system to: (1) Provide a reliable geometric description of a robotic task space, and (2) Enable robotic remediation to be conducted more effectively and more economically than with available techniques. A system such as ICERVS is needed because of the problems discussed below

  19. District heating and cooling systems for communities through power plant retrofit and distribution network. Volume 3. Tasks 4-6. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Watt, J.R.; Sommerfield, G.A.

    1979-08-01

    Stone and Webster Engineering Corporation is a member of the Demonstration Team to review and assess the technical aspects of cogeneration for district heating. Task 4 details the most practical retrofit schemes. Of the cogeneration schemes studied, a back-pressure turbine is considered the best source of steam for district heating. Battelle Columbus Laboratories is a member of the Demonstration Team employed to investigate several institutional issues affecting the success of district heating. The Toledo Edison legal staff reviewed the legal aspects of mandate to serve, easement and franchise requirements, and corporate charter requirements. The principal findings of both the Battelle investigations and the legal research are summarized in Task 5. A complete discussion of each issue is included in the two sections labeled Legal Issues and Institutional Issues. In Task 6, Battelle Columbus Laboratories completed a preliminary economic analysis, incorporating accurate input parameters applicable to utility ownership of the proposed district-heating system. The methodology used is summarized, the assumptions are listed, and the results are briefly reviewed.

  20. Performance of a Hot-Dry Climate Whole-House Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    Weitzel, E. [Alliance for Residential Building Innovation, Davis, CA (United States); German, A. [Alliance for Residential Building Innovation, Davis, CA (United States); Porse, E. [Alliance for Residential Building Innovation, Davis, CA (United States)

    2014-06-01

    The Stockton house retrofit is a two-story Tudor style single family deep retrofit in the hot-dry climate of Stockton, CA. The home is representative of a deep retrofit option of the scaled home energy upgrade packages offered to targeted neighborhoods under the pilot Large-Scale Retrofit Program (LSRP) administered by the Alliance for Residential Building Innovation (ARBI). Deep retrofit packages expand on the standard package by adding HVAC, water heater and window upgrades to the ducting, attic and floor insulation, domestic hot water insulation, envelope sealing, lighting and ventilation upgrades. Site energy savings with the deep retrofit were 23% compared to the pre-retrofit case, and 15% higher than the savings estimated for the standard retrofit package. Energy savings were largely a result of the water heater upgrade, and a combination of the envelope sealing, insulation and HVAC upgrade. The HVAC system was of higher efficiency than the building code standard. Overall the financed retrofit would have been more cost effective had a less expensive HVAC system been selected and barriers to wall insulation remedied. The homeowner experienced improved comfort throughout the monitored period and was satisfied with the resulting utility bill savings.

  1. Performance of a Hot-Dry Climate Whole-House Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    Weitzel, E.; German, A.; Porse, E.

    2014-06-01

    The Stockton house retrofit is a two-story tudor style single family deep retrofit in the hot-dry climate of Stockton, CA. The home is representative of a deep retrofit option of the scaled home energy upgrade packages offered to targeted neighborhoods under the pilot Large-Scale Retrofit Program (LSRP) administered by the Alliance for Residential Building Innovation (ARBI). Deep retrofit packages expand on the standard package by adding HVAC, water heater and window upgrades to the ducting, attic and floor insulation, domestic hot water insulation, envelope sealing, lighting and ventilation upgrades. Site energy savings with the deep retrofit were 23% compared to the pre-retrofit case, and 15% higher than the savings estimated for the standard retrofit package. Energy savings were largely a result of the water heater upgrade, and a combination of the envelope sealing, insulation and HVAC upgrade. The HVAC system was of higher efficiency than the building code standard. Overall the financed retrofit would have been more cost effective had a less expensive HVAC system been selected and barriers to wall insulation remedied. The homeowner experienced improved comfort throughout the monitored period and was satisfied with the resulting utility bill savings.

  2. RETROFITTING DENIZ PALACE HISTORIC BUILDING FOR REUSING

    Directory of Open Access Journals (Sweden)

    Ezgi KORKMAZ

    2013-01-01

    Full Text Available There is a big stock of historic structures in Turkey. Many of those structures continue to serve by changing their functions which brings new loads to the building. During their long life, historic structures have experienced many actions occurred over long periods of time and endured long term deteriorating effects and earthquake loads, besides these effects changing of the function affects the load bearing capacity of the building. This study is focused on restoration and retrofitting of historic multi storey masonry building named Deniz Palace Building which is located in Istanbul where the whole city is seismic prone area itself. Earthquake resistance is the main purpose of decision for retrofitting and strengthening of the building. In this sense walls are sheathed by concrete, floors are strengthened by steel I profiles and concrete, and foundations are reconstructed. During the restoration, interventions are made based on prevention of historic values. Static calculations are done particularly. For this purpose, foundation retrofitting is made primarily and some critical walls are sheathed by concrete. Fire protection system is designed and according to the evacuation plan some additions such as elevator shaft are constructed.

  3. Interactive computer enhanced remote viewing system

    International Nuclear Information System (INIS)

    Smith, D.A.; Tourtellott, J.A.

    1994-01-01

    The Interactive, Computer Enhanced, Remote Viewing System (ICERVSA) is a volumetric data system designed to help the Department of Energy (DOE) improve remote operations in hazardous sites by providing reliable and accurate maps of task spaces where robots will clean up nuclear wastes. The ICERVS mission is to acquire, store, integrate and manage all the sensor data for a site and to provide the necessary tools to facilitate its visualization and interpretation. Empirical sensor data enters through the Common Interface for Sensors and after initial processing, is stored in the Volumetric Database. The data can be analyzed and displayed via a Graphic User Interface with a variety of visualization tools. Other tools permit the construction of geometric objects, such as wire frame models, to represent objects which the operator may recognize in the live TV image. A computer image can be generated that matches the viewpoint of the live TV camera at the remote site, facilitating access to site data. Lastly, the data can be gathered, processed, and transmitted in acceptable form to a robotic controller. Descriptions are given of all these components. The final phase of the ICERVS project, which has just begun, will produce a full scale system and demonstrate it at a DOE site to be selected. A task added to this Phase will adapt the ICERVS to meet the needs of the Dismantlement and Decommissioning (D and D) work at the Oak Ridge National Laboratory (ORNL)

  4. A behavioral and systems view of professionalism.

    Science.gov (United States)

    Lesser, Cara S; Lucey, Catherine R; Egener, Barry; Braddock, Clarence H; Linas, Stuart L; Levinson, Wendy

    2010-12-22

    Professionalism may not be sufficient to drive the profound and far-reaching changes needed in the US health care system, but without it, the health care enterprise is lost. Formal statements defining professionalism have been abstract and principle based, without a clear description of what professional behaviors look like in practice. This article proposes a behavioral and systems view of professionalism that provides a practical approach for physicians and the organizations in which they work. A more behaviorally oriented definition makes the pursuit of professionalism in daily practice more accessible and attainable. Professionalism needs to evolve from being conceptualized as an innate character trait or virtue to sophisticated competencies that can and must be taught and refined over a lifetime of practice. Furthermore, professional behaviors are profoundly influenced by the organizational and environmental context of contemporary medical practice, and these external forces need to be harnessed to support--not inhibit--professionalism in practice. This perspective on professionalism provides an opportunity to improve the delivery of health care through education and system-level reform.

  5. Scaling view by the Virtual Nature Systems

    Science.gov (United States)

    Klenov, Valeriy

    2010-05-01

    , and of river basins, in multi-layer, multi-scale, and multi-driven structures of surface processes. It results in the Information Loss Law for observed memory of the VNS (and of external drivers) which gradually cut off own Past and distort own history. This view on the GeoDynamics appeared after long time field measurements thousand of terrace levels, hundreds of terrace ranks, and many terrace complexes in river basins of all scales - for the purpose to recognize their deforming by climatic and tectonic spatial-temporal influences. The method for following up of terrace levels along valleys was used in the Geomorphology and Geology for a long time, by linking fragments of level to ‘cycles'. It gradually linked them by heights above riverbed. The understanding of this logical mistake was happened (as insight) during observing from upstream a valley. All fragmental levels downstream were good visible, without chances for their correlation ‘by height' or ‘by number'. Instead of link of fragments, this explains process of river valleys' stochastic GeoDynamics by properties of the ONES (I. Prigogine et al., 1984) to generate oscillations. Is only first view, but later it turned to simple mechanic of Information Loss Law action in the GeoInformatics for Nature Systems (Klenov, 1980, et al.). The Information Loss distorts and destroys natural records (sources for data on the Past exogenous and endogenous rivers). This simple equation was received by multiple measures of terrace rank, and other natural records. It explains origin of false trend in natural records, destroys most own history by stochastic dynamics of the ONES. It prevents to restore of nature records as a memory of the Past. Non-disturbed is only small time between the Past and the Future, which looks like a peak between two non-linear losses. The history of Past (of the ANS, and of external drivers) are destroyed by the ANS. The Future becomes none determined due unknown 2D data of future external

  6. Phased Retrofits in Existing Homes in Florida Phase II: Shallow Plus Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Martin, E. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-12-01

    Originally published in February 2016, this revision contains an added section called 'Evaluation of Complete Central System Replacement with Inverter-Driven Heat Pump,' which presents the designs and energy savings evaluations of two different schemes wherein inverter-driven systems replaced a home's existing central system. Analyses for three additional retrofit measures were bolstered by longer-term data; these are described in the sections on supplemental mini-split heat pumps (MSHPs), smart thermostats, and heat pump clothes dryers. The sections on supplemental MSHPs and smart thermostats were also enhanced with larger sample sizes and projections of weather-normalized annual energy savings. Finally, peak system hour energy demand-reduction predictions are provided for all retrofit measures where meaningful impacts could be drawn.

  7. Phased Retrofits in Existing Homes in Florida Phase II: Shallow Plus Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Parker, D. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Martin, E. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States)

    2016-12-01

    Originally published in February 2016, this revision contains an added section called 'Evaluation of Complete Central System Replacement with Inverter-Driven Heat Pump,' which presents the designs and energy savings evaluations of two different schemes wherein inverter-driven systems replaced a home’s existing central system. Analyses for three additional retrofit measures were bolstered by longer-term data; these are described in the sections on supplemental mini-split heat pumps (MSHPs), smart thermostats, and heat pump clothes dryers. The sections on supplemental MSHPs and smart thermostats were also enhanced with larger sample sizes and projections of weather-normalized annual energy savings. Finally, peak system hour energy demand-reduction predictions are provided for all retrofit measures where meaningful impacts could be drawn.

  8. Expert assessments of retrofitting coal-fired power plants with carbon dioxide capture technologies

    International Nuclear Information System (INIS)

    Chung, Timothy S.; Patino-Echeverri, Dalia; Johnson, Timothy L.

    2011-01-01

    A set of 13 US based experts in post-combustion and oxy-fuel combustion CO 2 capture systems responded to an extensive questionnaire asking their views on the present status and future expected performance and costs for amine-based, chilled ammonia, and oxy-combustion retrofits of coal-fired power plants. This paper presents the experts' responses for technology maturity, ideal plant characteristics for early adopters, and the extent to which R and D and deployment incentives will impact costs. It also presents the best estimates and 95% confidence limits of the energy penalties associated with amine-based systems. The results show a general consensus that amine-based systems are closer to commercial application, but potential for improving performance and lowering costs is limited; chilled ammonia and oxy-combustion offer greater potential for cost reductions, but not without greater uncertainty regarding scale and technical feasibility. - Highlights: → Study presents experts' views on CCS retrofit costs and performance. → Experts commented on amine-based systems, chilled ammonia, and oxy-fuel combustion. → Estimates of future energy penalty show uncertainty for the three technologies. → These estimates under an aggressive RD and D policy scenario narrow significantly. → The experts' judgments support the need for enhanced RD and D for post-combustion CCS.

  9. Expert assessments of retrofitting coal-fired power plants with carbon dioxide capture technologies

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Timothy S. [Eastern Research Group, Inc., 110 Hartwell Avenue 1, Lexington, MA 02421-3134l (United States); Patino-Echeverri, Dalia, E-mail: dalia.patino@duke.edu [Nicholas School of the Environment, Box 90328, Duke University, Durham NC 27708 (United States); Johnson, Timothy L. [Nicholas School of the Environment, Box 90328, Duke University, Durham NC 27708 (United States)

    2011-09-15

    A set of 13 US based experts in post-combustion and oxy-fuel combustion CO{sub 2} capture systems responded to an extensive questionnaire asking their views on the present status and future expected performance and costs for amine-based, chilled ammonia, and oxy-combustion retrofits of coal-fired power plants. This paper presents the experts' responses for technology maturity, ideal plant characteristics for early adopters, and the extent to which R and D and deployment incentives will impact costs. It also presents the best estimates and 95% confidence limits of the energy penalties associated with amine-based systems. The results show a general consensus that amine-based systems are closer to commercial application, but potential for improving performance and lowering costs is limited; chilled ammonia and oxy-combustion offer greater potential for cost reductions, but not without greater uncertainty regarding scale and technical feasibility. - Highlights: > Study presents experts' views on CCS retrofit costs and performance. > Experts commented on amine-based systems, chilled ammonia, and oxy-fuel combustion. > Estimates of future energy penalty show uncertainty for the three technologies. > These estimates under an aggressive RD and D policy scenario narrow significantly. > The experts' judgments support the need for enhanced RD and D for post-combustion CCS.

  10. Strategy Guideline. Mitigation of Retrofit Risk Factors

    Energy Technology Data Exchange (ETDEWEB)

    Berman, M. [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States); Smith, P. [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States); Porse, E. [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States)

    2012-12-01

    The Alliance for Residential Building Innovation (ARBI) Building America team is currently developing strategies designed to promote and achieve increased energy savings and promote upgrades in the residential retrofit sector. These strategies are targeted to retrofit program managers, retrofit contractors, policy makers, academic researchers, and non-governmental organizations. This report focuses on four key areas to promote home energy upgrades: fostering accurate energy savings projections; understanding consumer perceptions for energy savings; measuring energy savings, and ensuring quality control for retrofit installations.

  11. Strategy Guideline: Mitigation of Retrofit Risk Factors

    Energy Technology Data Exchange (ETDEWEB)

    Berman, M.; Smith, P.; Porse, E.

    2012-12-01

    The Alliance for Residential Building Innovation (ARBI) is currently developing strategies designed to promote and achieve increased energy savings and promote upgrades in the residential retrofit sector. These strategies are targeted to retrofit program managers, retrofit contractors, policy makers, academic researchers, and non-governmental organizations. This report focuses on four key areas to promote home energy upgrades: fostering accurate energy savings projections; understanding consumer perceptions for energy savings; measuring energy savings, and ensuring quality control for retrofit installations.

  12. Pilot retrofit test of refrigerant R-134a for GDSCC

    Science.gov (United States)

    Albus, J.; Brown, B.; Dungao, M.; Spencer, G.

    1994-01-01

    NASA has issued an interim policy requiring all of its Centers to eliminate consumption (purchase) of stratospheric ozone-depleting substances, including chlorofluorocarbons (CFC's), by 1995. Also, plans must be outlined for the eventual phase out of their usage. The greatest source of CFC consumption and usage at the Goldstone Deep Space Communications Complex is refrigerant R-12, which is used in many of the facility's air-conditioning systems. A pilot retrofit test shows that retrofitting R-12 air-conditioning systems with hydrofluorocarbon R-13a would be a workable means to comply with the R-12 portion of NASA's policy. Results indicate acceptable cost levels and nearly equivalent system performance.

  13. Wyandotte Neighborhood Stabilization Program: Retrofit of Two Homes

    Energy Technology Data Exchange (ETDEWEB)

    Lukachko, A. [Building Science Corporation (BSC), Somerville, MA (United States); Grin, A. [Building Science Corporation (BSC), Somerville, MA (United States); Bergey, D. [Building Science Corporation (BSC), Somerville, MA (United States)

    2013-04-01

    The Wyandotte NSP2 project aims to build 20 new houses and retrofit 20 existing houses in Wyandotte, MI. Wyandotte is part of a Michigan State Housing Development Authority-led consortium that is funded by HUD under the NSP2 program. The City of Wyandotte has also been awarded DOE EE&CBG funds that are being used to develop a district ground source heat pump (GSHP) system to service the project. This report details the retrofit of two existing houses in the program, and examines the energy efficiency recommendations for the homes. The report will be of interest to anyone planning an affordable, high performance retrofit of an existing home in a cold climate zone. Information from this report will also be useful to retrofit or weatherization program staff as some of the proposed retrofit solutions will apply to a wide range of projects. Preliminary results from the first complete house suggest that the technology package employed (which includes spray foam insulation and insulating sheathing) does meet the specific whole house water, air, and thermal control requirements, as well as, the project’s affordability goals. Monitoring of the GSHP system has been recommended and analysis of this information is not yet available.

  14. Energy Retrofit for Aging K-12 Schools.

    Science.gov (United States)

    3D/International, Houston, TX.

    Successfully retrofitting aging K-12 schools using energy conservation measures (ECM) that can improve the physical plant and reduce energy consumption are explored. Topics explore how certain ECM measures can benefit educational facilities, why retrofitting begun sooner rather than later is important, how to finance the retrofit program, and the…

  15. Combined cycle plant controls retrofit case history

    International Nuclear Information System (INIS)

    Tenney, D.; Pieszchala, T.

    1991-01-01

    The Comanche Power Station, Public Service of Oklahoma's combined cycle generating facility, underwent a controls and operator panel retrofit at the end of 1988. The plant consists of two gas turbines, two heat recovery boilers and a steam turbine along with three generators. This paper examines the extent to which the original goals and specifications were met. Costs, operating principles and modifications since the original installation are discussed. Operating procedures are compared with the original system. The future of the plant is discussed and the impact on the power system grid is analyzed

  16. Retrofitting of existing housing stock

    DEFF Research Database (Denmark)

    Unterrainer, Walter

    2015-01-01

    The paper is a case study in retrofitting an urban quarter with social housing of the 1950´s and 1960´s - a model project in Amberg/Germany. It documents and discusses applied ´acupuncture´ and innovative strategies on very different scales as well as on different layers, in order to meet the goal...... of a sustainable retrofitting project in a holistic sense: This included cultural, social, environmental and economic sustainability. The first phase of the project is built and the process included a high level of user participation. The project is an example of integral design from competition level...

  17. Field Assessment of Energy Audit Tools for Retrofit Programs

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, J. [Univ. of Minnesota, St. Paul, MN (United States); Bohac, D. [Univ. of Minnesota, St. Paul, MN (United States); Nelson, C. [Univ. of Minnesota, St. Paul, MN (United States); Smith, I. [Univ. of Minnesota, St. Paul, MN (United States)

    2013-07-01

    This project focused on the use of home energy ratings as a tool to promote energy retrofits in existing homes. A home energy rating provides a quantitative appraisal of a home’s energy performance, usually compared to a benchmark such as the average energy use of similar homes in the same region. Rating systems based on energy performance models, the focus of this report, can establish a home’s achievable energy efficiency potential and provide a quantitative assessment of energy savings after retrofits are completed, although their accuracy needs to be verified by actual measurement or billing data. Ratings can also show homeowners where they stand compared to their neighbors, thus creating social pressure to conform to or surpass others. This project field-tested three different building performance models of varying complexity, in order to assess their value as rating systems in the context of a residential retrofit program: Home Energy Score, SIMPLE, and REM/Rate.

  18. Development of ITER in-vessel viewing and metrology systems

    Energy Technology Data Exchange (ETDEWEB)

    Obara, Kenjiro; Kakudate, Satoshi; Nakahira, Masataka; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER in-vessel viewing system is vital for detecting and locating damage to in-vessel components such as the blankets and divertors and in monitoring and assisting in-vessel maintenance. This system must be able to operate at high temperature (200degC) under intense gamma radiation ({approx}30 kGy/h) in a high vacuum or 1 bar inert gas. A periscope viewing system was chosen as a reference due to its clear, wide view and a fiberscope viewing system chosen as a backup for viewing in narrow confines. According to the ITER R and D program, both systems and a metrology system are being developed through the joint efforts of Japan, the U.S., and RF Home Teams. This paper outlines design and technology development mainly on periscope in-vessel viewing and laser metrology contributed by the Japan Home Team. (author)

  19. Development of ITER in-vessel viewing and metrology systems

    International Nuclear Information System (INIS)

    Obara, Kenjiro; Kakudate, Satoshi; Nakahira, Masataka; Ito, Akira

    1998-01-01

    The ITER in-vessel viewing system is vital for detecting and locating damage to in-vessel components such as the blankets and divertors and in monitoring and assisting in-vessel maintenance. This system must be able to operate at high temperature (200degC) under intense gamma radiation (∼30 kGy/h) in a high vacuum or 1 bar inert gas. A periscope viewing system was chosen as a reference due to its clear, wide view and a fiberscope viewing system chosen as a backup for viewing in narrow confines. According to the ITER R and D program, both systems and a metrology system are being developed through the joint efforts of Japan, the U.S., and RF Home Teams. This paper outlines design and technology development mainly on periscope in-vessel viewing and laser metrology contributed by the Japan Home Team. (author)

  20. Seismic retrofitting of Apsara reactor building

    International Nuclear Information System (INIS)

    Reddy, G.R.; Parulekar, Y.M.; Sharma, A.; Rao, K.N.; Narasimhan, Rajiv; Srinivas, K.; Basha, S.M.; Thomas, V.S.; Soma Kumar, K.

    2006-01-01

    Seismic analysis of Apsara Reactor building was carried out and was found not meeting the current seismic requirements. Due to the building not qualifying for seismic loads, a retrofit scheme using elasto-plastic dampers is proposed. Following activities have been performed in this direction: Carried out detailed seismic analysis of Apsara reactor building structure incorporating proposed seismic retrofit. Demonstrating the capability of the retrofitted structure to with stand the earth quake level for Trombay site as per the current standards by analysis and by model studies. Implementation of seismic retrofit program. This paper presents the details of above aspects related to Seismic analysis and retrofitting of Apsara reactor building. (author)

  1. Nordic campus retrofitting concepts - Scalable practices

    DEFF Research Database (Denmark)

    Eriksson, Robert; Nenonen, Suvi; Junghans, Antje

    2015-01-01

    Multidisciplinary collaboration and transformations in learning processes can be supported by activity-based campus retrofitting. The aim of this paper is to analyse the ongoing campus retrofitting processes at the three university campuses and to identify the elements of activity......-based retrofitting. We answer the questions “What kind of examples of retrofitting are there at Nordic Campuses?” and “What kind of elements are typical for activity-based retrofitting concepts?” The 3-level framework of campus retrofitting processes was employed when conducting the three case studies. The cases...... were about the new ways of researching, collaborating and learning with the concepts of Living lab, Creative community for innovation and entrepreneurship and Network of learning hubs. The cases provided the first insights on retrofitting based on users’ changing needs and the requirements of more...

  2. Retrofitting of existing housing stock

    DEFF Research Database (Denmark)

    Unterrainer, Walter

    2015-01-01

    The paper is a case study in retrofitting an urban quarter with social housing of the 1950´s and 1960´s - a model project in Amberg/Germany. It documents and discusses applied ´acupuncture´ and innovative strategies on very different scales as well as on different layers, in order to meet the goa...

  3. Mini-Split Heat Pumps Multifamily Retrofit Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, Jordan [ARIES Collaborative, New York, NY (United States); Podorson, David [ARIES Collaborative, New York, NY (United States); Varshney, Kapil [ARIES Collaborative, New York, NY (United States)

    2014-05-01

    Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

  4. Measured Cooling Performance and Potential for Buried Duct Condensation in a 1991 Central Florida Retrofit Home

    Energy Technology Data Exchange (ETDEWEB)

    Chasar, Dave [Building America Partership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Withers, Charles R. [Building America Partership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States)

    2013-02-01

    FSEC conducted energy performance monitoring of two existing residences in Central Florida that were undergoing various retrofits. These homes were occupied by FSEC researchers and were fully instrumented to provide detailed energy, temperature, and humidity measurements. The data provided feedback about the performance of two levels of retrofit in two types of homes in a hot-humid climate. This report covers a moderate-level retrofit and includes two years of pre-retrofit data to characterize the impact of improvements. The other home is a 'deep energy retrofit' (detailed in a separate report) that has performed at near zero energy with a photovoltaic (PV) system and extensive envelope improvements.

  5. An Ultra-High Speed Whole Slide Image Viewing System

    Directory of Open Access Journals (Sweden)

    Yukako Yagi

    2012-01-01

    Full Text Available Background: One of the goals for a Whole Slide Imaging (WSI system is implementation in the clinical practice of pathology. One of the unresolved problems in accomplishing this goal is the speed of the entire process, i.e., from viewing the slides through making the final diagnosis. Most users are not satisfied with the correct viewing speeds of available systems. We have evaluated a new WSI viewing station and tool that focuses on speed.

  6. Air Distribution Retrofit Strategies for Affordable Housing

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, Jordan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Conlin, Francis [National Renewable Energy Lab. (NREL), Golden, CO (United States); Holloway, Parker [National Renewable Energy Lab. (NREL), Golden, CO (United States); Podorson, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Varshney, Kapil [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-03-01

    In multifamily and attached buildings, traditional duct sealing methods are often impractical or costly and disruptive because of the difficulty in accessing leakage sites. In this project, two retrofit duct sealing techniques -- manually-applied sealants and injecting a spray sealant, were implemented in several low-rise multi-unit buildings. An analysis on the cost and performance of the two methods are presented. Each method was used in twenty housing units: approximately half of each group of units are single story and the remainder two-story. Results show that duct leakage to the outside was reduced by an average of 59% through the use of manual methods, and by 90% in the units where the injected spray sealant was used. It was found that 73% of the leakage reduction in homes that were treated with injected spray sealant was attributable to the manual sealing done at boots, returns and the air handler. The cost of manually-applying sealant ranged from $275 to $511 per unit and for the injected spray sealant the cost was $700 per unit. Modeling suggests a simple payback of 2.2 years for manual sealing and 4.7 years for the injected spray sealant system. Utility bills were collected for one year before and after the retrofits. Utility bill analysis shows 14% and 16% energy savings using injected spray sealant system and hand sealing procedure respectively in heating season whereas in cooling season, energy savings using injected spray sealant system and hand sealing were both 16%.

  7. Air Distribution Retrofit Strategies for Affordable Housing

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J. [Advanced Residential Integrated Energy Solutions (ARIES), New York, NY (United States); Conlin, F. [Advanced Residential Integrated Energy Solutions (ARIES), New York, NY (United States); Holloway, Parker [Advanced Residential Integrated Energy Solutions (ARIES), New York, NY (United States); Podorson, David [Advanced Residential Integrated Energy Solutions (ARIES), New York, NY (United States); Varshney, Kapil [Advanced Residential Integrated Energy Solutions (ARIES), New York, NY (United States)

    2014-03-01

    In multifamily and attached buildings, traditional duct sealing methods are often impractical or costly and disruptive because of the difficulty in accessing leakage sites. In this project, two retrofit duct sealing techniques, manually-applied sealants and injecting a spray sealant, were implemented in several low-rise multiunit buildings. An analysis on the cost and performance of the two methods are presented. Each method was used in twenty housing units: approximately half of each group of units are single story and the remainder are two story. Results show that duct leakage to the outside was reduced by an average of 59% through the use of manual methods, and by 90% in the units where the injected spray sealant was used. It was found that 73% of the leakage reduction in homes that were treated with injected spray sealant was attributable to the manual sealing done at boots, returns and the air handler. The cost of manually-applying sealant ranged from $275 to $511 per unit and for the injected spray sealant the cost was $700 per unit. Modeling suggests a simple payback of 2.2 years for manual sealing and 4.7 years for the injected spray sealant system. Utility bills were collected for one year before and after the retrofits. Utility bill analysis shows 14% and 16% energy savings using injected spray sealant system and hand sealing procedure respectively in heating season whereas in cooling season, energy savings using injected spray sealant system and hand sealing were both 16%.

  8. Indoor Environmental Quality Benefits of Apartment Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Noris, Federico [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Adamkiewicz, Gary [Harvard School of Public Health, Boston MA (United States); Delp, William W. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hotchi, Toshifumi [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Russell, Marion [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Singer, Brett C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spears, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Vermeer, Kimberly [Urban Habitate Initiatives Inc., Boston, MA (United States); Fisk, William J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-06-01

    Sixteen apartments serving low-income populations in three buildings were retrofit with the goal of simultaneously reducing energy consumption and improving indoor environmental quality (IEQ). Retrofit measures varied among apartments and included, among others, envelope sealing, installation of continuous mechanical ventilation systems, upgrading bathroom fans and range hoods, attic insulation, replacement of heating and cooling systems, and adding wall-mounted particle air cleaners. IEQ parameters were measured, generally for two one-week periods before and after the retrofits. The measurements indicate an overall improvement in IEQ conditions after the retrofits. Comfort conditions, bathroom humidity, and concentrations of carbon dioxide, acetaldehyde, volatile organic compounds, and particles generally improved. Formaldehyde and nitrogen dioxide levels decreased in the building with the highest concentrations, were unchanged in a second building, and increased in a third building. IEQ parameters other than particles improved more in apartments with continuous mechanical ventilation systems installed. In general, but not consistently, larger percent increases in air exchange rates were associated with larger percent decreases in indoor levels of the pollutants that primarily come from indoor sources.

  9. System View of Business Continuity Management

    Directory of Open Access Journals (Sweden)

    Vlasta Svata

    2013-04-01

    Full Text Available We are living in time where the impact on continuity still grows both on the side our personal lives and business activities. In the same time different international, regional, national, state and private organizations initiated to provide different actions and regulations in order to find the best solutions of this situation. The result is that there exist the whole set of different views over this problem. The main aim of this article is to map this situation, to provide the general framework of business continuity management (BCM and to discuss its main parts and their mutual relationships. Special impact is given to the integration of the business and IT oriented solutions and ways of assurance initiatives helping managers to assess the implemented solutions and their compliance to the business strategy and other existing regulations.

  10. Deep Energy Retrofits - Eleven California Case Studies

    Energy Technology Data Exchange (ETDEWEB)

    Less, Brennan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Fisher, Jeremy [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Walker, Iain [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This research documents and demonstrates viable approaches using existing materials, tools and technologies in owner-conducted deep energy retrofits (DERs). These retrofits are meant to reduce energy use by 70% or more, and include extensive upgrades to the building enclosure, heating, cooling and hot water equipment, and often incorporate appliance and lighting upgrades as well as the addition of renewable energy. In this report, 11 Northern California (IECC climate zone 3) DER case studies are described and analyzed in detail, including building diagnostic tests and end-use energy monitoring results. All projects recognized the need to improve the home and its systems approximately to current building code-levels, and then pursued deeper energy reductions through either enhanced technology/ building enclosure measures, or through occupant conservation efforts, both of which achieved impressive energy performance and reductions. The beyond-code incremental DER costs averaged $25,910 for the six homes where cost data were available. DERs were affordable when these incremental costs were financed as part of a remodel, averaging a $30 per month increase in the net-cost of home ownership.

  11. Remote operations and viewing using the monitor system

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.; Baldwin, T.S.; Ekberg, E.L.; Hernandez, T.R.; Raybun, J.L.

    1984-01-01

    Over the past two years, major rebuilding operations were conducted at the Clinton P. Anderson Meson Physics Facility (LAMPF). These operations involved replacement of complex experimental apparatus in high-radiation areas using servomanipulators and video viewing. All remote tasks were completed on or ahead of allotted schedules. This success is attributed to continuing improvement of manipulators, viewing systems, and operating techniques

  12. Elk viewing in Pennsylvania: an evolving eco-tourism system

    Science.gov (United States)

    Bruce E. Lord; Charles H. Strauss; Michael J. Powell

    2002-01-01

    In 1997, the Pennsylvania Game Commission established an Elk Viewing Area within Pennsylvania's elk range. The viewing area has become the focus for a developing eco-tourism system. During the four years of operation, a research team from Penn State has measured the number of visitors, their expenditure patterns, and other parameters of their visit. The trends...

  13. Views on Evolvability of Embedded Systems

    NARCIS (Netherlands)

    Laar, P. van de; Punter, T.

    2011-01-01

    Evolvability, the ability to respond effectively to change, represents a major challenge to today's high-end embedded systems, such as those developed in the medical domain by Philips Healthcare. These systems are typically developed by multi-disciplinary teams, located around the world, and are in

  14. Views on evolvability of embedded systems

    NARCIS (Netherlands)

    Laar, van de P.J.L.J.; Punter, H.T.

    2011-01-01

    Evolvability, the ability to respond effectively to change, represents a major challenge to today's high-end embedded systems, such as those developed in the medical domain by Philips Healthcare. These systems are typically developed by multi-disciplinary teams, located around the world, and are in

  15. New views of the solar system

    CERN Document Server

    2007-01-01

    Suitable for ages 10-17, this work takes a look at the developments in research about the solar system, including articles on Pluto, the eight chief planets, and dwarf planets. It includes photos and drawings that showcase the planets, asteroids, comets, and also a collection of images of the solar system.

  16. Managing Space System Faults: Coalescing NASA's Views

    Science.gov (United States)

    Muirhead, Brian; Fesq, Lorraine

    2012-01-01

    Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.

  17. The sensitivity of schlieren systems for viewing ultrasound

    International Nuclear Information System (INIS)

    Hanstead, P.D.

    1976-01-01

    A novel set of simplifying assumptions makes computer prediction of schlieren sensitivity possible economically. Predictions correlate with experimental and published figures. Other means of improving sensitivity are given. A compact schlieren system giving binocular stereoscopic viewing is described

  18. Optimizing Whole House Deep Energy Retrofit Packages: A Case Study of Existing Chicago-Area Homes

    Directory of Open Access Journals (Sweden)

    Honnie Aguilar Leinartas

    2015-05-01

    Full Text Available Improving the energy efficiency of the residential building stock plays a key role in mitigating global climate change. New guidelines are targeting widespread application of deep energy retrofits to existing homes that reduce their annual energy use by 50%, but questions remain as to how to identify and prioritize the most cost-effective retrofit measures. This work demonstrates the utility of whole building energy simulation and optimization software to construct a “tool-box” of prescriptive deep energy retrofits that can be applied to large portions of the existing housing stock. We consider 10 generally representative typology groups of existing single-family detached homes built prior to 1978 in the Chicago area for identifying cost-optimal deep energy retrofit packages. Simulations were conducted in BEopt and EnergyPlus operating on a cloud-computing platform to first identify cost-optimal enclosure retrofits and then identify cost-optimal upgrades to heating, ventilation, and air-conditioning (HVAC systems. Results reveal that prescriptive retrofit packages achieving at least 50% site energy savings can be defined for most homes through a combination of envelope retrofits, lighting upgrades, and upgrades to existing HVAC system efficiency or conversion to mini-split heat pumps. The average upfront cost of retrofits is estimated to be ~$14,400, resulting in average annual site energy savings of ~54% and an average simple payback period of ~25 years. Widespread application of these prescriptive retrofit packages across the existing Chicago-area residential building stock is predicted to reduce annual site energy use by 3.7 × 1016 J and yield approximately $280 million USD in annual energy savings.

  19. Phased Retrofits in Existing Homes in Florida Phase II. Shallow Plus Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Martin, E. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-02-01

    The BAPIRC team and Florida Power and Light (FPL) electric utility pursued a pilot phased energy-efficiency retrofit program in Florida by creating detailed data on the energy and economic performance of two levels of retrofit - simple and deep. For this Phased Deep Retrofit (PDR) project, a total of 56 homes spread across the utility partner's territory in east central Florida, southeast Florida, and southwest Florida were instrumented between August 2012 and January 2013, and received simple pass-through retrofit measures during the period of March 2013 - June 2013. Ten of these homes received a deeper package of retrofits during August 2013 - December 2013.

  20. Retrofitting a 1960s Split-Level, Cold-Climate Home

    Energy Technology Data Exchange (ETDEWEB)

    Puttagunta, Srikanth [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-07-13

    National programs such as Home Performance with ENERGY STAR® and numerous other utility air-sealing programs have made homeowners aware of the benefits of energy-efficiency retrofits. Yet these programs tend to focus only on the low-hanging fruit: they recommend air sealing the thermal envelope and ductwork where accessible, switching to efficient lighting and low-flow fixtures, and improving the efficiency of mechanical systems (though insufficient funds or lack of knowledge to implement these improvements commonly prevent the implementation of these higher cost upgrades). At the other end of the spectrum, various utilities across the country are encouraging deep energy retrofit programs. Although deep energy retrofits typically seek 50% energy savings, they are often quite costly and are most applicable to gut-rehab projects. A significant potential for lowering energy use in existing homes lies between the lowhanging fruit and deep energy retrofit approaches—retrofits that save approximately 30% in energy compared to the pre-retrofit conditions. The energy-efficiency measures need to be nonintrusive so the retrofit projects can be accomplished in occupied homes.

  1. INDIAN CASTE SYSTEM: HISTORICAL AND PSYCHOANALYTIC VIEWS.

    Science.gov (United States)

    Vallabhaneni, Madhusudana Rao

    2015-12-01

    This paper elucidates the historical origins and transformations of India's caste system. Surveying the complex developments over many centuries, it points out that three positions have been taken in this regard. One suggests that the caste one is born into can be transcended within one's lifetime by performing good deeds. The other declares caste to be immutable forever. And, the third says that one can be reborn into a higher caste if one lives a virtuous life. Moving on to the sociopolitical realm, the paper notes how these positions have been used and exploited. The paper then attempts to anchor the existence and purpose of the Hindu caste system in Freud's ideas about group psychology and Klein's proposals of splitting and projective identification. The paper also deploys the large group psychology concepts of Volkan and the culturally nuanced psychoanalytic anthropology of Roland and Kakar. It concludes with delineating some ameliorative strategies for this tragic problem in the otherwise robust democratic society of India.

  2. Thermal performance of lived-in passive solar buildings: Pt. 2; School retrofit at Yeruham, Israel

    Energy Technology Data Exchange (ETDEWEB)

    Faiman, D. (Ben-Gurion Univ. of the Negev, Sede Boqer (Israel). J. Blaustein Inst. for Desert Research)

    1992-07-01

    This paper describes various, partially improvised, experiments that were devised in order to assess the thermal performance of a solar retrofit that was added to a school building. Typical measurements results are shown and analyzed. Two definitions are given for the system efficiency of solar retrofits to large-mass structures: one for the case when there is no backup system to complicate the analysis, and one for suggested use when auxiliary heating is present. (author).

  3. Fleet retrofit report

    Science.gov (United States)

    1973-01-01

    Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.

  4. Trial Demonstration of Area Lighting Retrofit: Yuma Border Patrol, Yuma Arizona

    Energy Technology Data Exchange (ETDEWEB)

    Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McCullough, Jeffrey J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    The Yuma Sector Border Patrol Area is a high flux lighting application in a high temperature environment, presenting a formidable challenge for light-emitting diodes (LEDs). This retrofit is an Energy Savings Performance Contract ENABLE project under the U.S. Department of Energy (DOE) Federal Energy Management Program. If high flux LED technology performs well in a region with high ambient temperature and solar radiation, it can perform well in most outdoor environments. The design process for the Yuma retrofit has already provided valuable knowledge to CBP and DOE. The LED lighting system selected for the retrofit is expected to reduce energy consumption 69% compared to the incumbent quartz metal halide (QMH) lighting system. If the LED lighting system is installed, GATEWAY will continue to document and disseminate information regarding the installation and long-term performance so that others may also gain valuable knowledge from the Yuma Sector Border Patrol Area lighting retrofit.

  5. Viewing Systems for Large Underground Storage Tanks

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Robinson, C.W.; Anderson, E.K.; Pardini, A.F.

    1996-01-01

    Specialized remote video systems have been successfully developed and deployed in a number of large radiological Underground Storage Tanks (USTs)that tolerate the hostile tank interior, while providing high resolution video to a remotely located operator. The deployment is through 100 mm (4 in) tank openings, while incorporating full video functions of the camera, lights, and zoom lens. The usage of remote video minimizes the potential for personnel exposure to radiological and hazardous conditions, and maximizes the quality of the visual data used to assess the interior conditions of both tank and contents. The robustness of this type of remote system has a direct effect on the potential for radiological exposure that personnel may encounter. The USTs typical of the Savannah River and Hanford Department Of Energy - (DOE) sites are typically 4.5 million liter (1.2 million gal) units under earth. or concrete overburden with limited openings to the surface. The interior is both highly contaminated and radioactive with a wide variety of nuclear processing waste material. Some of the tanks are -flammable rated -to Class 1, Division 1,and personnel presence at or near the openings should be minimized. The interior of these USTs must be assessed periodically as part of the ongoing management of the tanks and as a step towards tank remediation. The systems are unique in their deployment technology, which virtually eliminates the potential for entrapment in a tank, and their ability to withstand flammable environments. A multiplicity of components used within a common packaging allow for cost effective and appropriate levels of technology, with radiation hardened components on some units and lesser requirements on other units. All units are completely self contained for video, zoom lens, lighting, deployment,as well as being self purging, and modular in construction

  6. A psychologist's view of validating aviation systems

    Science.gov (United States)

    Stein, Earl S.; Wagner, Dan

    1994-01-01

    All systems, no matter what they are designed to do, have shortcomings that may make them less productive than was hoped during the initial development. Such shortcomings can arise at any stage of development: from conception to the end of the implementation life cycle. While systems failure and errors of a lesser magnitude can occur as a function of mechanical or software breakdown, the majority of such problems, in aviation are usually laid on the shoulders of the human operator and, to a lesser extent, on human factors. The operator bears the responsibility and blame even though, from a human factors perspective, error may have been designed into the system. Human factors is not a new concept in aviation. The name may be new, but the issues related to operators in the loop date back to the industrial revolution of the nineteenth century and certainly to the aviation build-up for World War I. During this first global confrontation, military services from all sides discovered rather quickly that poor selection and training led to drastically increased personnel losses. While hardware design became an issue later, the early efforts were primarily focused on increased care in pilot selection and on their training. This actually involved early labor-intensive simulation, using such devices as sticks and chairs mounted on rope networks which could be manually moved in response to control input. The use of selection criteria and improved training led to more viable person-machine systems. More pilots survived training and their first ten missions in the air, a rule of thumb arrived at by experience which predicted ultimate survival better than any other. This rule was to hold through World War II. At that time, personnel selection and training became very sophisticated based on previous standards. Also, many psychologists were drafted into Army Air Corps programs which were geared towards refining the human factor. However, despite the talent involved in these programs

  7. Evaluation of NOx emissions of a retrofitted Euro 5 passenger car for the Horizon prize "Engine retrofit".

    Science.gov (United States)

    Giechaskiel, Barouch; Suarez-Bertoa, Ricardo; Lähde, Tero; Clairotte, Michael; Carriero, Massimo; Bonnel, Pierre; Maggiore, Maurizio

    2018-06-13

    The Horizon 2020 prize for the "Engine Retrofit for Clean Air" aims at reducing the pollution in cities by spurring the development of retrofit technology for diesel engines. A Euro 5 passenger car was retrofitted with an under-floor SCR (Selective Catalytic Reduction) for NO x catalyst in combination with a solid ammonia based dosing system as the NO x reductant. The vehicle was tested both on the road and on the chassis dynamometer under various test cycles and ambient temperatures. The NO x emissions were reduced by 350-1100 mg/km (60-85%) in the laboratory depending on the test cycle and engine conditions (cold or hot start), except at type approval conditions. The reduction for cold start urban cycles was < 75 mg/km (< 15%). The on road and laboratory tests were inline. In some high speed conditions significant increase of ammonia (NH 3 ) and nitrous oxide (N 2 O) were measured. No effect was seen on other pollutants (hydrocarbons, carbon monoxide and particles). The results of the present study show that retrofitting high emitting vehicles can significantly reduce vehicle NO x emissions and ultimately pollution in cities. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  8. Structuring lighting retrofit projects for success

    International Nuclear Information System (INIS)

    Fetters, J.L.

    1993-01-01

    Several trends are converging to create a substantial market for lighting retrofits in these uncertain economic times. Low interest rates are making investments in buildings more attractive than alternative financial investments such as CD's. With activity in the new construction market at an all time low, savvy contractors are turning to the retrofit market - restoring, renovating and upgrading existing buildings. Heightened environmental concerns are fueling lighting incentive programs from the electric utilities and the EPA. Improvements in lighting technology are arriving in the marketplace at an accelerated rate. Building occupants are demanding higher quality workplaces and managers are seeking higher levels of productivity. Replacing older lighting equipment can substantially improve lighting efficiency, decrease energy and maintenance costs and, at the same time, improve the workplace by increasing lighting quality Lighting retrofit projects have a demonstrated track record, reducing lighting costs on the order of 50%. This experience can be applied to help structure retrofit projects. But, in order to reap all the benefits available from a retrofit project, it must be structured for success. The retrofit option introduces a unique series of issues for building owners, managers and engineers. The best way to prevent these issues from undermining the success of retrofit projects is to anticipate and completely plan for them. Successful retrofit projects run smoothER and stay within budgetary constraints. Three important considerations will guide the successful project: (1) Start comprehensive planning early, (2) Investigate existing conditions, and (3) Be sensitive to owner/occupants needs keep building operational

  9. Quantifying the Financial Benefits of Multifamily Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Philbrick, D. [Elevate Energy, Chicago, IL (United States); Scheu, R. [Elevate Energy, Chicago, IL (United States); Brand, L. [Elevate Energy, Chicago, IL (United States)

    2016-01-01

    The U.S. Department of Energy’s Building America research team Partnership for Advanced Residential Retrofit analyzed building, energy, and financial program data as well as other public and private data to examine the relationship between energy-efficiency retrofits and financial performance on three levels: building, city, and community.

  10. Prologis Rolls Out Warehouse Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    Prologis partnered with the U.S. Department of Energy (DOE) to develop and implement solutions to retrofit existing buildings to reduce annual energy consumption by at least 30% versus pre-retrofit energy use as part of DOE’s Commercial Building Partnership (CBP) program.

  11. Metrology/viewing system for next generation fusion reactors

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Barry, R.E.; Chesser, J.B.; Menon, M.M.; Dagher, M.A.

    1997-01-01

    Next generation fusion reactors require accurate measuring systems to verify sub-millimeter alignment of plasma-facing components in the reactor vessel. A metrology system capable of achieving such accuracy must be compatible with the vessel environment of high gamma radiation, high vacuum, elevated temperature, and magnetic field. This environment requires that the system must be remotely deployed. A coherent, frequency modulated laser radar system is being integrated with a remotely operated deployment system to meet these requirements. The metrology/viewing system consists of a compact laser transceiver optics module which is linked through fiber optics to the laser source and imaging units that are located outside of the harsh environment. The deployment mechanism is a telescopic-mast positioning system. This paper identifies the requirements for the International Thermonuclear Experimental Reactor metrology and viewing system, and describes a remotely operated precision ranging and surface mapping system

  12. Study on the application of ambient vibration tests to evaluate the effectiveness of seismic retrofitting

    Science.gov (United States)

    Liang, Li; Takaaki, Ohkubo; Guang-hui, Li

    2018-03-01

    In recent years, earthquakes have occurred frequently, and the seismic performance of existing school buildings has become particularly important. The main method for improving the seismic resistance of existing buildings is reinforcement. However, there are few effective methods to evaluate the effect of reinforcement. Ambient vibration measurement experiments were conducted before and after seismic retrofitting using wireless measurement system and the changes of vibration characteristics were compared. The changes of acceleration response spectrum, natural periods and vibration modes indicate that the wireless vibration measurement system can be effectively applied to evaluate the effect of seismic retrofitting. The method can evaluate the effect of seismic retrofitting qualitatively, it is difficult to evaluate the effect of seismic retrofitting quantitatively at this stage.

  13. Regional views on the new system of radiological protection

    International Nuclear Information System (INIS)

    Yoda, N.; Fujimoto, K.; Miyamaru, K.; Lee, J.; Loy, J.; Pan, Z.Q.

    2005-01-01

    This document takes stock on the second session of the second Asian regional conference. In this session, japanese regulators, researchers and operators presented their regional views on the new ICRP recommendations. It was commonly expressed that an understanding of the background to the introduced concepts in the new recommendations is required. Other regional views from Korea, Australia and China were also expressed, based on their own regulatory system and referring to radiological protection topics in their countries. (A.L.B.)

  14. Controlling nuclear retrofit costs

    International Nuclear Information System (INIS)

    Gruber, C.O.

    1985-01-01

    Increased safety regulations that required modifications to nuclear power plants have had an impact on the capital and expense budgets of utilities. The author addresses the budgeting and control of project-related expenditures, and notes the importance of total cost management throughout the project's life cycle. That total includes the systems, procedures, personnel, expertise, and organization involved in the process. A rational and structured evaluation process at the beginning, realistic targets, and an organizational framework are key components. 2 references, 3 figures, 1 table

  15. Energy retrofit of an office building by substitution of the generation system: performance evaluation via dynamic simulation versus current technical standards

    International Nuclear Information System (INIS)

    Testi, D; Schito, E; Grassi, W; Menchetti, E

    2014-01-01

    Constructions built in Italy before 1945 (about 30% of the total built stock) feature low energy efficiency. Retrofit actions in this field can lead to valuable energetic and economic savings. In this work, we ran a dynamic simulation of a historical building of the University of Pisa during the heating season. We firstly evaluated the energy requirements of the building and the performance of the existing natural gas boiler, validated with past billings of natural gas. We also verified the energetic savings obtainable by the substitution of the boiler with an air-to-water electrically-driven modulating heat pump, simulated through a cycle-based model, evaluating the main economic metrics. The cycle-based model of the heat pump, validated with manufacturers' data available only at specified temperature and load conditions, can provide more accurate results than the simplified models adopted by current technical standards, thus increasing the effectiveness of energy audits

  16. State Analysis: A Control Architecture View of Systems Engineering

    Science.gov (United States)

    Rasmussen, Robert D.

    2005-01-01

    A viewgraph presentation on the state analysis process is shown. The topics include: 1) Issues with growing complexity; 2) Limits of common practice; 3) Exploiting a control point of view; 4) A glimpse at the State Analysis process; 5) Synergy with model-based systems engineering; and 6) Bridging the systems to software gap.

  17. Proven Performance of Seven Cold Climate Deep Retrofit Homes

    Energy Technology Data Exchange (ETDEWEB)

    Osser, R.; Neuhauser, K.; Ueno, K.

    2012-06-01

    Seven test homes located in Massachusetts are examined within this report. The retrofit strategies of each home are presented along with a comparison of the pre- and post-retrofit airtightness achieved by the group. Pre- and post-retrofit utility bills were collected; energy models were used to estimate pre-retrofit energy use when bills were unavailable.

  18. Retrofit of a MultiFamily Mass Masonry Building in New England

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K. [Building Science Corporation, Somerville, MA (United States); Kerrigan, P. [Building Science Corporation, Somerville, MA (United States); Wytrykowska, H. [Building Science Corporation, Somerville, MA (United States); Van Straaten, R. [Building Science Corporation, Somerville, MA (United States)

    2013-08-01

    Merrimack Valley Habitat for Humanity (MVHfH) has partnered with Building Science Corporation to provide high performance affordable housing for 10 families in the retrofit of an existing brick building (a former convent) into condominiums. The research performed for this project provides information regarding advanced retrofit packages for multi-family masonry buildings in Cold climates. In particular, this project demonstrates safe, durable, and cost-effective solutions that will potentially benefit millions of multi-family brick buildings throughout the East Coast and Midwest (Cold climates). The retrofit packages provide insight on the opportunities for and constraints on retrofitting multifamily buildings with ambitious energy performance goals but a limited budget. The condominium conversion project will contribute to several areas of research on enclosures, space conditioning, and water heating. Enclosure items include insulation of mass masonry building on the interior, airtightness of these types of retrofits, multi-unit building compartmentalization, window selection, and roof insulation strategies. Mechanical system items include combined hydronic and space heating systems with hydronic distribution in small (low load) units, and ventilation system retrofits for multifamily buildings.

  19. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  20. A Nuclear Scale System Based on LabVIEW

    International Nuclear Information System (INIS)

    Liu Shixing; Gu Qindong

    2009-01-01

    Nuclear mass scales measure the weight of materials which absorb and attenuate the nuclear radiation when the low energy γ-ray through it and is a non-contact continuous measurement device with simple structure and reliable operation. LabVIEW as a graphical programming language is a standard data acquisition and instrument control software. Based on the principle of nuclear mass scale measuring system, monitoring software for nuclear scale system is designed using LabVIEW programming environment. Software architecture mainly composed of three basic modules which include the monitoring software, databases and Web services. It achieves measurement data acquisition, status monitoring, and data management and has networking functions. (authors)

  1. View Synthesis for Advanced 3D Video Systems

    Directory of Open Access Journals (Sweden)

    2009-02-01

    Full Text Available Interest in 3D video applications and systems is growing rapidly and technology is maturating. It is expected that multiview autostereoscopic displays will play an important role in home user environments, since they support multiuser 3D sensation and motion parallax impression. The tremendous data rate cannot be handled efficiently by representation and coding formats such as MVC or MPEG-C Part 3. Multiview video plus depth (MVD is a new format that efficiently supports such advanced 3DV systems, but this requires high-quality intermediate view synthesis. For this, a new approach is presented that separates unreliable image regions along depth discontinuities from reliable image regions, which are treated separately and fused to the final interpolated view. In contrast to previous layered approaches, our algorithm uses two boundary layers and one reliable layer, performs image-based 3D warping only, and was generically implemented, that is, does not necessarily rely on 3D graphics support. Furthermore, different hole-filling and filtering methods are added to provide high-quality intermediate views. As a result, high-quality intermediate views for an existing 9-view auto-stereoscopic display as well as other stereo- and multiscopic displays are presented, which prove the suitability of our approach for advanced 3DV systems.

  2. View Synthesis for Advanced 3D Video Systems

    Directory of Open Access Journals (Sweden)

    Müller Karsten

    2008-01-01

    Full Text Available Abstract Interest in 3D video applications and systems is growing rapidly and technology is maturating. It is expected that multiview autostereoscopic displays will play an important role in home user environments, since they support multiuser 3D sensation and motion parallax impression. The tremendous data rate cannot be handled efficiently by representation and coding formats such as MVC or MPEG-C Part 3. Multiview video plus depth (MVD is a new format that efficiently supports such advanced 3DV systems, but this requires high-quality intermediate view synthesis. For this, a new approach is presented that separates unreliable image regions along depth discontinuities from reliable image regions, which are treated separately and fused to the final interpolated view. In contrast to previous layered approaches, our algorithm uses two boundary layers and one reliable layer, performs image-based 3D warping only, and was generically implemented, that is, does not necessarily rely on 3D graphics support. Furthermore, different hole-filling and filtering methods are added to provide high-quality intermediate views. As a result, high-quality intermediate views for an existing 9-view auto-stereoscopic display as well as other stereo- and multiscopic displays are presented, which prove the suitability of our approach for advanced 3DV systems.

  3. Bay Ridge Gardens - Mixed Humid Affordable Multifamily Housing Deep Energy Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    Lyons, James [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Moore, Mike [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Thompson, Margo [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States)

    2013-08-01

    Under this project, Newport Partners (as part of the BA-PIRC research team) evaluated the installation, measured performance, and cost effectiveness of efficiency upgrade measures for a tenant-in-place deep energy retrofit (DER) at the Bay Ridge multifamily development in Annapolis, Maryland. This report summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete. The Bay Ridge project is comprised of a "base scope" retrofit which was estimated to achieve a 30%+ savings (relative to pre-retrofit) on 186 apartments, and a "DER scope" which was estimated to achieve 50% savings (relative to pre-retrofit) on a 12-unit building. A wide range of efficiency measures was applied to pursue this savings target for the DER building, including improvements/replacements of mechanical equipment and distribution systems, appliances, lighting and lighting controls, the building envelope, hot water conservation measures, and resident education. The results of this research build upon the current body of knowledge of multifamily retrofits. Towards this end, the research team has collected and generated data on the selection of measures, their estimated performance, their measured performance, and risk factors and their impact on potential measures.

  4. Infrastructure Retrofit Design via Composite Mechanics

    Science.gov (United States)

    Chamis, Christos, C.; Gotsis,Pascal K.

    1998-01-01

    Select applications are described to illustrate the concept for retrofitting reinforced concrete infrastructure with fiber reinforced plastic laminates. The concept is first illustrated by using an axially loaded reinforced concrete column. A reinforced concrete arch and a dome are then used to illustrate the versatility of the concept. Advanced methods such as finite element structural analysis and progressive structural fracture are then used to evaluate the retrofitting laminate adequacy. Results obtains show that retrofits can be designed to double and even triple the as-designed load of the select reinforced concrete infrastructures.

  5. An ultra-high speed whole slide image viewing system.

    Science.gov (United States)

    Yagi, Yukako; Yoshioka, Shigeatsu; Kyusojin, Hiroshi; Onozato, Maristela; Mizutani, Yoichi; Osato, Kiyoshi; Yada, Hiroaki; Mark, Eugene J; Frosch, Matthew P; Louis, David N

    2012-01-01

    One of the goals for a Whole Slide Imaging (WSI) system is implementation in the clinical practice of pathology. One of the unresolved problems in accomplishing this goal is the speed of the entire process, i.e., from viewing the slides through making the final diagnosis. Most users are not satisfied with the correct viewing speeds of available systems. We have evaluated a new WSI viewing station and tool that focuses on speed. A prototype WSI viewer based on PlayStation®3 with wireless controllers was evaluated at the Department of Pathology at MGH for the following reasons: 1. For the simulation of signing-out cases; 2. Enabling discussion at a consensus conference; and 3. Use at slide seminars during a Continuing Medical Education course. Pathologists were being able to use the system comfortably after 0-15 min training. There were no complaints regarding speed. Most pathologists were satisfied with the functionality, usability and speed of the system. The most difficult situation was simulating diagnostic sign-out. The preliminary results of adapting the Sony PlayStation®3 (PS3®) as an ultra-high speed WSI viewing system were promising. The achieved speed is consistent with what would be needed to use WSI in daily practice.

  6. Meters and systems for future. Meters fit for retrofitting with a communication module; Zaehler und Systeme fuer die Zukunft. Mit Kommunikationsmodul nachruestbare Zaehler

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, Martin [Itron GmbH, Karlsruhe (Germany). Marketing Gas Germany; Sievers, Marco [Allmess GmbH, Oldenburg (Germany). Marketing und Vertrieb Systeme, Wasser- und Waermewirtschaft

    2011-04-18

    The contribution looks at the situation of smart meters in view of the German government's decision of 2007, which required that smart meters should be installed within a period of six years. However, there is no market-compatible strategy for their introduction, and legal regulations are still lacking. For example, the EnWG demands the obligatory installation of smart meters from 1 January 2010 only in newly constructed or extensively modernized buildings and also on the user's demand.

  7. Digital instrumentation for retrofit applications

    International Nuclear Information System (INIS)

    Dennis, U.E.

    1986-01-01

    There can be many reasons for applying retrofit designs to existing power plants. Whatever the reasons, care in planning and instrument design will be required in order to derive the full benefits afforded by today's technology. Specifically, the availability of microprocessors and their related integrated circuits make possible capabilities, accuracies, reliabilities, maintainability and user interfaces not achievable when original equipment was designed. Some of the motives for the replacement of current instrumentation are examined and the various benefits and pitfalls of applying present day microprocessor technology to new designs are discussed. From this, a set of design objectives can be formulated that can best take advantage of modern technology. General Electric's design solution, a family of instruments called NUMAC (Nuclear Measurement, Analysis and Control) is described, followed by descriptions of instruments currently in production and those contemplated for design in the near future

  8. Intelligent viewing control for robotic and automation systems

    Science.gov (United States)

    Schenker, Paul S.; Peters, Stephen F.; Paljug, Eric D.; Kim, Won S.

    1994-10-01

    We present a new system for supervisory automated control of multiple remote cameras. Our primary purpose in developing this system has been to provide capability for knowledge- based, `hands-off' viewing during execution of teleoperation/telerobotic tasks. The reported technology has broader applicability to remote surveillance, telescience observation, automated manufacturing workcells, etc. We refer to this new capability as `Intelligent Viewing Control (IVC),' distinguishing it from a simple programmed camera motion control. In the IVC system, camera viewing assignment, sequencing, positioning, panning, and parameter adjustment (zoom, focus, aperture, etc.) are invoked and interactively executed by real-time by a knowledge-based controller, drawing on a priori known task models and constraints, including operator preferences. This multi-camera control is integrated with a real-time, high-fidelity 3D graphics simulation, which is correctly calibrated in perspective to the actual cameras and their platform kinematics (translation/pan-tilt). Such merged graphics- with-video design allows the system user to preview and modify the planned (`choreographed') viewing sequences. Further, during actual task execution, the system operator has available both the resulting optimized video sequence, as well as supplementary graphics views from arbitrary perspectives. IVC, including operator-interactive designation of robot task actions, is presented to the user as a well-integrated video-graphic single screen user interface allowing easy access to all relevant telerobot communication/command/control resources. We describe and show pictorial results of a preliminary IVC system implementation for telerobotic servicing of a satellite.

  9. An Intelligent Lighting Control System (ILCS) using LabVIEW ...

    African Journals Online (AJOL)

    An Intelligent Lighting Control System (ILCS) was proposed and designed by considering ergonomic setting and energy efficiency. The integration of CompactRIO as a main hardware and National Instrument Laboratory Virtual Instrument Engineering Workbench (NI LabVIEW) 2012 as a platform to design an interactive ...

  10. An inductive database system based on virtual mining views

    NARCIS (Netherlands)

    Blockeel, H.; Calders, T.G.K.; Fromont, É.; Goethals, B.; Prado, A.; Robardet, C.

    2012-01-01

    Inductive databases integrate database querying with database mining. In this article, we present an inductive database system that does not rely on a new data mining query language, but on plain SQL. We propose an intuitive and elegant framework based on virtual mining views, which are relational

  11. Fundamentals of process intensification: A process systems engineering view

    DEFF Research Database (Denmark)

    Babi, Deenesh Kavi; Sales Cruz, Alfonso Mauricio; Gani, Rafiqul

    2016-01-01

    This chapter gives an overview of the fundamentals of process intensification from a process systems engineering point of view. The concept of process intensification, including process integration, is explained together with the drivers for applying process intensification, which can be achieved...

  12. Large-scale building energy efficiency retrofit: Concept, model and control

    International Nuclear Information System (INIS)

    Wu, Zhou; Wang, Bo; Xia, Xiaohua

    2016-01-01

    BEER (Building energy efficiency retrofit) projects are initiated in many nations and regions over the world. Existing studies of BEER focus on modeling and planning based on one building and one year period of retrofitting, which cannot be applied to certain large BEER projects with multiple buildings and multi-year retrofit. In this paper, the large-scale BEER problem is defined in a general TBT (time-building-technology) framework, which fits essential requirements of real-world projects. The large-scale BEER is newly studied in the control approach rather than the optimization approach commonly used before. Optimal control is proposed to design optimal retrofitting strategy in terms of maximal energy savings and maximal NPV (net present value). The designed strategy is dynamically changing on dimensions of time, building and technology. The TBT framework and the optimal control approach are verified in a large BEER project, and results indicate that promising performance of energy and cost savings can be achieved in the general TBT framework. - Highlights: • Energy efficiency retrofit of many buildings is studied. • A TBT (time-building-technology) framework is proposed. • The control system of the large-scale BEER is modeled. • The optimal retrofitting strategy is obtained.

  13. Galileo spacecraft solid-state imaging system view of Antarctica

    Science.gov (United States)

    1990-01-01

    Galileo spacecraft solid-state imaging system view of Antarctica was taken during its first encounter with the Earth. This color picture of Antarctica is part of a mosaic of pictures covering the entire polar continent showing the Ross Ice Shelf and its border with the sea and mountains poking through the ice near the McMurdo Station. From top to bottom, the frame looks across about half of Antarctica. View provided by the Jet Propulsion Laboratory (JPL) with alternate number P-37297.

  14. A survey of some solar energy retrofits.

    Science.gov (United States)

    1981-01-01

    The report briefly describes a survey of some solar energy retrofits, such as solar heaters and Trombe walls, that can be easily adapted into existing buildings belonging to the Department. With their relatively high cost, commercial solar heaters ha...

  15. Nine Steps to a Successful Lighting Retrofit.

    Science.gov (United States)

    Ries, Jack

    1998-01-01

    Presents the steps needed to successfully design a lighting retrofit of school classrooms. Tips cover budgeting, technology, financing, contractor selection, assessing area function, and choosing a light source. (GR)

  16. Quantifying the Financial Benefits of Multifamily Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Philbrick, D. [The Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Scheu, R. [The Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Brand, L. [The Partnership for Advanced Residential Retrofit, Chicago, IL (United States)

    2016-01-29

    Increasing the adoption of energy efficient building practices will require the energy sector to increase their understanding of the way that retrofits affect multifamily financial performance as well as how those indicators are interpreted by the lending and appraisal industries. This project analyzed building, energy, and financial program data as well as other public and private data to examine the relationship between energy efficiency retrofits and financial performance on three levels: building, city, and community. The project goals were to increase the data and analysis in the growing body of multifamily financial benefits work as well provide a framework for other geographies to produce similar characterization. The goals are accomplished through three tasks. Task one: A pre- and post-retrofit analysis of thirteen Chicago multifamily buildings. Task two: A comparison of Chicago income and expenses to two national datasets. Task three: An in-depth look at multifamily market sales data and the subsequent impact of buildings that undergo retrofits.

  17. Nuclear spectrometry data acquisition system based on LabVIEW

    International Nuclear Information System (INIS)

    Zhao Dan; Shen Li; Deng Lili; Zhou Sichun

    2006-01-01

    The whole process of designing nuclear spectrometry data acquisition system was particularized with LabVIEW and data acquisition board, based on virtual instrument technology. It can analyze the output of the radiation detector and give the height spectrum by the method of the continuous real-time data acquisition and the abstraction of pulse signal amplitude. The simple test shows that this system can meet the demand, and it can be easily expanded according to the situation. (authors)

  18. Comprehensive Planning for Passive Solar Architectural Retrofit

    Science.gov (United States)

    1980-05-01

    technical information, and the natural environ- ment. Since the Air Force Energy plan stresses Passive Solar (Architecture) before using Active Solar...retrofitted by-1990, and the Air Force Energy Plan stresses Passive Solar Applications. Bdcause of this requirement, you must consider the following retrofit...OF THI SUN AT NOON ON O CUMIN 21 EXAWMKU[ AT 3M. AN I S - W Figure 12-4 12-3 Skylight- use a reflector ,with horizontal skylights to ,iincrease solar

  19. A users view of the SPS and LEP control systems

    International Nuclear Information System (INIS)

    Bailey, R.

    1992-01-01

    Every accelerator has a control system; at present the SPS has two, both of which are needed to run the machine. Consequently a user of the SPS/LEP complex has to be concurrently familiar with three control systems. While this situation brings problems it allows, even forces, comparison between the different systems, which in turn enriches the user viewpoint. This paper assesses the SPS and LEP control systems from the point of view of the user, who may be an equipment specialist, operator, accelerator physicist or combinations thereof. (author)

  20. Iter in vessel viewing system design and assessment activities

    Energy Technology Data Exchange (ETDEWEB)

    Neri, C., E-mail: carlo.neri@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Costa, P.; Ferri De Collibus, M.; Florean, M.; Mugnaini, G.; Pillon, M.; Pollastrone, F.; Rossi, P. [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2011-10-15

    The In Vessel Viewing System (IVVS) is fundamental remote handling equipment, which will be used to make a survey of the status of the blanket first wall and divertor plasma facing components. A prototype of a laser In Vessel Viewing and ranging System was developed and tested at ENEA laboratories in Frascati under EFDA task agreements, it is able to perform sub-millimetric bi-dimensional and three-dimensional images inside ITER during maintenance procedure allowing the evaluation of the state and damages of the in-vessel surface. The present prototype has been designed to operate under room conditions and starting from springtime 2009 a Grant with F4E is in progress for the design and the assessment of the IVVS system for ITER, keeping in account all the environmental conditions and constraints.

  1. Cost-benefit analysis of retrofit of high-intensity discharge factory lighting with energy-saving alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Preston, D.J. [Alabama Industrial Assessment Center, The University of Alabama, 1530 W. Tremont St, Allentown, PA 18102 (United States); Woodbury, K.A. [Alabama Industrial Assessment Center, The University of Alabama, 290 Hardaway Hall, Box 870276, Tuscaloosa, AL 35487-0276 (United States)

    2013-05-15

    Due to increased concern about overall energy costs and the appearance of efficient and inexpensive lighting system alternatives, factories and plants with high-intensity discharge (HID) lighting are forced to consider retrofit with more modern, energy-efficient lighting. The decision is complicated from an economic perspective, and there is a lack of information readily available on the topic. This study provides an analysis of the replacement by retrofit of common probe-start metal halide and high-pressure sodium industrial lighting systems. Retrofit options considered include the more recent pulse-start metal halide lamps and a range of T5 high output and T8 fluorescent lamp configurations. Recent data on lighting system pricing, labor and energy costs, and time required for tasks are reported. The results generated include savings, payback period, and net present value for many retrofit options, as well as the change in energy consumption, carbon footprint, and lumen output for each retrofit. Effects of varying rate of return and daily duration of operation are considered. Based on change in lumen output, payback period, net present value, and comparison of lighting quality, one or two options are recommended from the overall retrofit options considered. A fluorescent retrofit is recommended for each of the HID initial scenarios considered. The payback period is no more than 3 years in any recommended case. The focus of this study is on the potential energy and cost savings, and some proposed solutions may, or may not, be acceptable due to lack of illuminance uniformity.

  2. Evaluation of Various Retrofitting Concepts of Building Envelope for Offices Equipped with Large Radiant Ceiling Panels by Dynamic Simulations

    Directory of Open Access Journals (Sweden)

    Sabina Jordan

    2015-09-01

    Full Text Available In order to achieve significant savings in energy and an improved level of thermal comfort in retrofitted existing buildings, specific retrofitting concepts that combine new technologies and design need to be developed and implemented. Large radiant surfaces systems are now among the most promising future technologies to be used both in retrofitted and in new low-energy buildings. These kinds of systems have been the topic of several studies dealing with thermal comfort and energy utilization, but some specific issues concerning their possible use in various concepts for retrofitting are still poorly understood. In the present paper, some results of dynamic simulations, with the transient system simulation tool (TRNSYS model, of the retrofitted offices equipped with radiant ceiling panels are presented and thoroughly analysed. Based on a precise comparison of the results of these simulations with actual measurements in the offices, certain input data for the model were added, so that the model was consequently validated. The model was then applied to the evaluation of various concepts of building envelopes for office retrofitting. By means of dynamic simulations of indoor environment it was possible to determine the benefits and limitations of individual retrofitting concepts. Some specific parameters, which are relevant to these concepts, were also identified.

  3. Post-Retrofit Residential Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Lancaster, Ross; lutzenhiser, Loren; Moezzi, Mithra; Widder, Sarah H.; Chandra, Subrato; Baechler, Michael C.

    2012-04-30

    This study examined a range of factors influencing energy consumption in households that had participated in residential energy-efficiency upgrades. The study was funded by a grant from the U.S. Department of Energy’s Pacific Northwest National Laboratory and was conducted by faculty and staff of Portland State University Center for Urban Studies and Department of Economics. This work was made possible through the assistance and support of the Energy Trust of Oregon (ETO), whose residential energy-efficiency programs provided the population from which the sample cases were drawn. All households in the study had participated in the ETO Home Performance with Energy Star (HPwES) program. A number of these had concurrently pursued measures through other ETO programs. Post-retrofit energy outcomes are rarely investigated on a house-by-house basis. Rather, aggregate changes are ordinarily the focus of program impact evaluations, with deviation from aggregate expectations chalked up to measurement error, the vagaries of weather and idiosyncrasies of occupants. However, understanding how homes perform post-retrofit on an individual basis can give important insights to increase energy savings at the participant and the programmatic level. Taking a more disaggregated approach, this study analyzed energy consumption data from before and after the retrofit activity and made comparisons with engineering estimates for the upgrades, to identify households that performed differently from what may have been expected based on the estimates. A statistical analysis using hierarchal linear models, which accounted for weather variations, was performed looking separately at gas and electrical use during the periods before and after upgrades took place. A more straightforward comparison of billing data for 12-month periods before and after the intervention was also performed, yielding the majority of the cases examined. The later approach allowed total energy use and costs to be

  4. The evaluation of retrofit measures in a tall residential building

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, M.M.; McLain, H.A.

    1995-07-01

    As part of a joint demonstration effort involving the US Department of Energy (DOE), the US Department of Housing and Urban Development (HUD), Boston Edison Company (BECo), and the Chelsea Housing Authority, Oak Ridge National Laboratory (ORNL) participated in the evaluation of energy and demand saving retrofits for a tall residential building located in Boston. The thirteen story all-electric building underwent window, lighting, and control renovations in December, 1992. annual energy consumption was reduced by 15% and peak demand fell by 17%. Hourly should building consumption data were available for the comparison of pre- and post- conditions and for calibration of a DOE-2.1D simulation model. The analysis found the window retrofit accounted for 90% of total energy savings and 95% of average demand savings, due to reductions in both conduction and infiltration. Benefits from lighting retrofits were low in cooling months and negligible in winter months due to the increase in the demand for electric resistance heating which was proportional to the reduction in lighting capacity. Finally, the simulation model verified that heating system controls had not been used as intended, and that the utility rate structure would not allow cost savings from the original control strategy. These results and other interesting lessons learned are presented.

  5. Field Assessment of Energy Audit Tools for Retrofit Programs

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, J.; Bohac, D.; Nelson, C.; Smith, I.

    2013-07-01

    This project focused on the use of home energy ratings as a tool to promote energy retrofits in existing homes. A home energy rating provides a quantitative appraisal of a home's asset performance, usually compared to a benchmark such as the average energy use of similar homes in the same region. Home rating systems can help motivate homeowners in several ways. Ratings can clearly communicate a home's achievable energy efficiency potential, provide a quantitative assessment of energy savings after retrofits are completed, and show homeowners how they rate compared to their neighbors, thus creating an incentive to conform to a social standard. An important consideration is how rating tools for the retrofit market will integrate with existing home energy service programs. For residential programs that target energy savings only, home visits should be focused on key efficiency measures for that home. In order to gain wide adoption, a rating tool must be easily integrated into the field process, demonstrate consistency and reasonable accuracy to earn the trust of home energy technicians, and have a low monetary cost and time hurdle for homeowners. Along with the Home Energy Score, this project also evaluated the energy modeling performance of SIMPLE and REM/Rate.

  6. Development of advanced retrofit FGD designs

    International Nuclear Information System (INIS)

    Dene, C.E.; Boward, W.L.; Noblett, J.G.; Keeth, R.J.

    1992-01-01

    The 1990 Clean Air Act Amendment is a dramatic departure from previous legislation in that it affords the electric utility industry the flexibility to achieve their portion of the sulfur dioxide reduction in a myriad of ways. Each utility must look at its system overall. One strategy which may prove beneficial is to remove as much SO 2 as possible at facilities where there is an existing flue gas desulfurization (FGD) system or where one is planned. In response to this need EPRI is developing a family of advanced retrofit FGD designs that incorporate recent advances in FGD technology. A range of design options are being investigated to determine both the SO 2 collection capability and the relative cost impacts of each option. Some of the design options considered include the use of trays, packing, additional liquid flow rate, and additives to boost the removal efficiency. These options are being investigated for limestone, and magnesium-enhanced lime systems. The sensitivity of these designs to changes in coal sulfur content, chloride content, unit size, gas velocity, and other factors are being investigated to determine how the performance of a designs is changed and the ability to meet compliance. This paper illustrates the type of analysis used to develop the advanced designs and presents the sensitivity of a Countercurrent spray tower design using limestone and forced oxidation to changes in specific design input parameters such as boiler load, tower height, and gas velocity

  7. A Primer on Financial System Meltdown. The Economists' View

    OpenAIRE

    Hahn, Franz R.

    2008-01-01

    Ideologues are quick to explain the current financial meltdown: it's the markets, stupid. Economists agree but add: it's politics too, stupid. Ideologues agree but counter: first and foremost it's capitalism, stupid. Economists agree but reply: §$%&?!, stupid. This is where this short paper takes us: it makes an attempt to give a brief overview of the economists' views on the ongoing financial system crisis explaining "§$%&?!, stupid".

  8. Digital remote viewing system for coronary care unit

    International Nuclear Information System (INIS)

    Cho, P.S.; Tillisch, J.; Huang, H.K.

    1987-01-01

    A digital remote viewing system developed for the coronary care unit at the UCLA Medical Center has been in clinical operation since March 1, 1987. The present system consists of three 512-line monitors, VAX 11/750, Gould IP8500 image processor and a broad-band communication system. The patients' images are acquired with a computed radiography system and are transmitted to the coronary care unit, which is five floors above the radiology department. This exhibit presents the architecture and the performance characteristics of the system. Also, the second-generation system, which consists of an intelligent local work station with three 1,024-line monitors and a fast digital communication network, will be introduced

  9. The system capacity view of aging and longevity

    Institute of Scientific and Technical Information of China (English)

    Jing-Dong J.Han; Lei Hou; Na Sun; Chi Xu; Joseph McDermott; Dan Wang

    2017-01-01

    Background:Aging is a complex systems level problem that needs a systems level solution.However,system models of aging and longevity,although urgently needed,are still lacking,largely due to the paucity of conceptual frameworks for modeling such a complex process.Results:We propose that aging can be viewed as a decline in system capacity,defined as the maximum level of output that a system produces to fulfill demands.Classical aging hallmarks and anti-aging strategies can be well-aligned to system capacity.Genetic variants responsible for lifespan variation across individuals or species can also be explained by their roles in system capacity.We further propose promising directions to develop systems approaches to modulate system capacity and thus extend both healthspan and lifespan.Conclusions:The system capacity model of aging provides an opportunity to examine aging at the systems level.This model predicts that the extent to which aging can be modulated is normally limited by the upper bound of the system capacity of a species.Within such a boundary,aging can be delayed by moderately increasing an individual's system capacity.Beyond such a boundary,increasing the upper bound is required,which is not unrealistic given the unlimited potential of regenerative medicine in the future,but it requires increasing the capacity of the whole system instead of only part of it.

  10. Coli see des Bois-Francs Victoriaville, Quebec : major retrofit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This profile presented details of a major retrofit of the Colisee des Bois-Francs Ice Rink in Victoriaville, Quebec. The retrofit included the recovery of heat rejected from the refrigeration system; extensive integration of the refrigeration system with heating, ventilation, and dehumidification systems; short-term heat storage; and the installation of a variable condensing temperature and pressure system. Characteristics of the arena were presented, including details of annual energy consumption, energy costs, and the surface area of the building, which was built in 1978. Annual energy costs for the building were estimated at $90,000. The overall cost of the retrofit was $693,300, with technical support provided by the CANMET Energy Technology Centre. Two factory-built commercial refrigeration systems were installed using floating head pressure. Heat transfer fluid in the cold secondary loop was a mixture of water and methanol, while the warm secondary loop contained a mixture of water and ethylene glycol. Energy efficiency measures included using condensation heat rejected in the warm secondary loop and transferred through a coil in the ventilation duct. A simplified system schematic was presented. Building energy consumption savings were estimated at 14 per cent savings for 50 per cent greater cooling capacity compared with the previous system. The use of modular package refrigeration units confined the refrigerant in the mechanical room and reduced the amount of refrigerant required by 70 per cent. Potential refrigerant leaks were also reduced. With the older system, leaks accounted for 120 t equivalent of carbon dioxide (CO{sub 2}) released per year. Additional benefits of the new system include better quality ice, a more reliable system and greater comfort for spectators. 2 figs.

  11. Integrating multi-view transmission system into MPEG-21 stereoscopic and multi-view DIA (digital item adaptation)

    Science.gov (United States)

    Lee, Seungwon; Park, Ilkwon; Kim, Manbae; Byun, Hyeran

    2006-10-01

    As digital broadcasting technologies have been rapidly progressed, users' expectations for realistic and interactive broadcasting services also have been increased. As one of such services, 3D multi-view broadcasting has received much attention recently. In general, all the view sequences acquired at the server are transmitted to the client. Then, the user can select a part of views or all the views according to display capabilities. However, this kind of system requires high processing power of the server as well as the client, thus posing a difficulty in practical applications. To overcome this problem, a relatively simple method is to transmit only two view-sequences requested by the client in order to deliver a stereoscopic video. In this system, effective communication between the server and the client is one of important aspects. In this paper, we propose an efficient multi-view system that transmits two view-sequences and their depth maps according to user's request. The view selection process is integrated into MPEG-21 DIA (Digital Item Adaptation) so that our system is compatible to MPEG-21 multimedia framework. DIA is generally composed of resource adaptation and descriptor adaptation. It is one of merits that SVA (stereoscopic video adaptation) descriptors defined in DIA standard are used to deliver users' preferences and device capabilities. Furthermore, multi-view descriptions related to multi-view camera and system are newly introduced. The syntax of the descriptions and their elements is represented in XML (eXtensible Markup Language) schema. If the client requests an adapted descriptor (e.g., view numbers) to the server, then the server sends its associated view sequences. Finally, we present a method which can reduce user's visual discomfort that might occur while viewing stereoscopic video. This phenomenon happens when view changes as well as when a stereoscopic image produces excessive disparity caused by a large baseline between two cameras. To

  12. A statistical view of uncertainty in expert systems

    International Nuclear Information System (INIS)

    Spiegelhalter, D.J.

    1986-01-01

    The constructors of expert systems interpret ''uncertainty'' in a wide sense and have suggested a variety of qualitative and quantitative techniques for handling the concept, such as the theory of ''endorsements,'' fuzzy reasoning, and belief functions. After a brief selective review of procedures that do not adhere to the laws of probability, it is argued that a subjectivist Bayesian view of uncertainty, if flexibly applied, can provide many of the features demanded by expert systems. This claim is illustrated with a number of examples of probabilistic reasoning, and a connection drawn with statistical work on the graphical representation of multivariate distributions. Possible areas of future research are outlined

  13. A user friendly Lidar system based on LabVIEW

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Mats; Weibring, P.

    1996-09-01

    Mobile differential absorption lidar (DIAL) systems have been used for the last two decades. The lidar group in Lund has performed many DIAL measurements with a mobile lidar system which was first described in 1987. This report describes how that system was updated with the graphical programming language LabVIEW in order to get a user friendly system. The software controls the lidar system and analyses measurement data. The measurement results are shown as maps of species concentration. New electronics to support the new lidar program have also been installed. The report describes how all supporting electronics and the program work. A user manual for the new program is also given. 19 refs, 79 figs, 23 charts

  14. Automatic Parking Based on a Bird's Eye View Vision System

    Directory of Open Access Journals (Sweden)

    Chunxiang Wang

    2014-03-01

    Full Text Available This paper aims at realizing an automatic parking method through a bird's eye view vision system. With this method, vehicles can make robust and real-time detection and recognition of parking spaces. During parking process, the omnidirectional information of the environment can be obtained by using four on-board fisheye cameras around the vehicle, which are the main part of the bird's eye view vision system. In order to achieve this purpose, a polynomial fisheye distortion model is firstly used for camera calibration. An image mosaicking method based on the Levenberg-Marquardt algorithm is used to combine four individual images from fisheye cameras into one omnidirectional bird's eye view image. Secondly, features of the parking spaces are extracted with a Radon transform based method. Finally, double circular trajectory planning and a preview control strategy are utilized to realize autonomous parking. Through experimental analysis, we can see that the proposed method can get effective and robust real-time results in both parking space recognition and automatic parking.

  15. Image-based fingerprint verification system using LabVIEW

    Directory of Open Access Journals (Sweden)

    Sunil K. Singla

    2008-09-01

    Full Text Available Biometric-based identification/verification systems provide a solution to the security concerns in the modern world where machine is replacing human in every aspect of life. Fingerprints, because of their uniqueness, are the most widely used and highly accepted biometrics. Fingerprint biometric systems are either minutiae-based or pattern learning (image based. The minutiae-based algorithm depends upon the local discontinuities in the ridge flow pattern and are used when template size is important while image-based matching algorithm uses both the micro and macro feature of a fingerprint and is used if fast response is required. In the present paper an image-based fingerprint verification system is discussed. The proposed method uses a learning phase, which is not present in conventional image-based systems. The learning phase uses pseudo random sub-sampling, which reduces the number of comparisons needed in the matching stage. This system has been developed using LabVIEW (Laboratory Virtual Instrument Engineering Workbench toolbox version 6i. The availability of datalog files in LabVIEW makes it one of the most promising candidates for its usage as a database. Datalog files can access and manipulate data and complex data structures quickly and easily. It makes writing and reading much faster. After extensive experimentation involving a large number of samples and different learning sizes, high accuracy with learning image size of 100 100 and a threshold value of 700 (1000 being the perfect match has been achieved.

  16. A distributed database view of network tracking systems

    Science.gov (United States)

    Yosinski, Jason; Paffenroth, Randy

    2008-04-01

    In distributed tracking systems, multiple non-collocated trackers cooperate to fuse local sensor data into a global track picture. Generating this global track picture at a central location is fairly straightforward, but the single point of failure and excessive bandwidth requirements introduced by centralized processing motivate the development of decentralized methods. In many decentralized tracking systems, trackers communicate with their peers via a lossy, bandwidth-limited network in which dropped, delayed, and out of order packets are typical. Oftentimes the decentralized tracking problem is viewed as a local tracking problem with a networking twist; we believe this view can underestimate the network complexities to be overcome. Indeed, a subsequent 'oversight' layer is often introduced to detect and handle track inconsistencies arising from a lack of robustness to network conditions. We instead pose the decentralized tracking problem as a distributed database problem, enabling us to draw inspiration from the vast extant literature on distributed databases. Using the two-phase commit algorithm, a well known technique for resolving transactions across a lossy network, we describe several ways in which one may build a distributed multiple hypothesis tracking system from the ground up to be robust to typical network intricacies. We pay particular attention to the dissimilar challenges presented by network track initiation vs. maintenance and suggest a hybrid system that balances speed and robustness by utilizing two-phase commit for only track initiation transactions. Finally, we present simulation results contrasting the performance of such a system with that of more traditional decentralized tracking implementations.

  17. Scattered housing energy retrofit program : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-11-15

    Between 1999 and 2006, home energy audits were conducted in 770 scattered houses belonging to the Toronto Community Housing Corporation (TCHC). Over the course of the project, 126 houses were retrofitted with energy saving measures based on calculations of the most cost-effective measures. This report outlined the work that was conducted by the contractor, GreenSaver over the course of the project. The report discussed the project players and project execution. It included a profile of audited houses; auditing procedure; house reports; retrofit work; contractor arranging service; and post-retrofit inspections. Comments on retrofit work not carried out were also provided. The report also discussed the results of the project, including energy savings and emission reductions and participant feedback. A summary of the energy efficiency retrofit survey was also presented along with lessons learned. These included the availability of a contingency fund; the importance of tenant involvement; and making arrangements for other repair work. It was concluded that the amount of expected energy savings on space heating bills varied from house to house, and fell between 15 and 74 per cent. The report recommended that tenants and staff in the social housing sector could benefit from a greater awareness of energy issues and its more efficient use, allowing even greater and longer lasting benefits from a project like this. 8 tabs.

  18. Choosing the Right Fireplace or Fireplace Retrofit Device

    Science.gov (United States)

    This page is about choosing a fireplace or fireplace retrofit device, including information on hang tags and a list of fireplaces and retrofits that have qualified under the voluntary fireplace program

  19. Assessment and retrofit program at work

    Energy Technology Data Exchange (ETDEWEB)

    Schuyler, G [Rowan Williams Davies and Irwin Inc., Guelph, ON (Canada); Lethbridge, S [Owens-Corning, Guelph, ON (Canada)

    1993-10-01

    A glass plant in Ontario volunteered for an assessment as part of the Green Industry Assessment Retrofit Program. The project was intended to assess pollution prevention and reduction, water conservation, and energy utilization at the plant. The plant produces glass fibers and is a major user of natural gas and electricity, with a minimum electrical demand of 4 MW. Total waste heat in the flue gas from the gas-fired melting furnaces, relative to 25[degree]C, is over 5 MW. Nitrogen oxides are the predominant air emission at the plant. Glass fiber scrap constitutes the bulk of the solid wastes produced. Conservation opportunities were identified and their payback periods calculated. Options considered to be feasible included heat recovery and power generation from the furnace exhaust gases, and moving the air conditioning system intakes so they draw in cool air instead of hot air from the melter area. Bioremediation was considered to have good potential for treating the glass fiber wastes. Under this concept, the waste would be cycled through reactor cells containing microorganisms that could remove the binders and coatings on the fibers. At the end of this process, the glass fiber would be of sufficient quality that it could be recycled directly to the melter. 1 tab.

  20. A system view of the No Fault Found (NFF) phenomenon

    International Nuclear Information System (INIS)

    Soederholm, Peter

    2007-01-01

    When a unit is tested outside a technical system, it has normally been removed due to a fault. However, in some cases the external test may not discover any fault and a No Fault Found (NFF) event may occur. The NFF phenomenon is a major problem when dealing with complex technical systems, and its consequences may be manifested in decreased safety and dependability and increased life cycle costs. There are multiple interacting causes of NFF, demanding tough requirements for successful solutions. The purpose of this paper is to describe the phenomenon of NFF and to highlight possible improvements for the prevention of causes of NFF and the reduction of its consequences. The study was performed as an explorative literature study, and the analysis was based on a holistic system view. The identified causes and solutions are related to life cycle stages, availability performance factors, and system stakeholders

  1. Evaluation of Crawlspace Retrofits in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Rudd, Armin [Building Science Corporation, Somerville, MA (United States)

    2014-09-01

    In 2011 and early 2012, Building Science Corporation (BSC) collaborated with Innova Services Corporation on a multifamily community unvented crawlspace retrofit project at Oakwood Gardens in Lansdale, Pennsylvania. BSC provided design consulting services and pre- and post-retrofit evaluation, testing, and data monitoring. The existing condition was a vented crawlspace with an uninsulated floor between the crawlspace and the dwelling units above. The crawlspace was therefore a critically weak link in the building enclosure and was ripe for improvement. Saving energy was the primary interest and goal, but the greatest challenge in this unvented crawlspace retrofit project was working through a crawlspace bulk water intrusion problem caused by inadequate site drainage, window well drainage, foundation wall drainage, and a rising water table during rainy periods.

  2. Low-E Retrofit Demonstration and Educational Program

    Energy Technology Data Exchange (ETDEWEB)

    Culp, Thomas D [Birch Point Consulting LLC; Wiehagen, Joseph [Home Innovation Research Labs, Inc.; Drumheller, S Craig [Home Innovation Research Labs, Inc.; Siegel, John [Quanta Technologies Inc.; Stratmoen, Todd [Larson Manufacturing

    2013-11-16

    The objective of this project was to demonstrate the capability of low-emissivity (low-E) storm windows / panels and low-E retrofit glazing systems to significantly and cost effectively improve the energy efficiency of both existing residential and commercial buildings. The key outcomes are listed below: RESIDENTIAL CASE STUDIES: (a) A residential case study in two large multifamily apartment buildings in Philadelphia showed a substantial 18-22% reduction in heating energy use and a 9% reduction in cooling energy use by replacing old clear glass storm windows with modern low-E storm windows. Furthermore, the new low-E storm windows reduced the overall apartment air leakage by an average of 10%. (b) Air leakage testing on interior low-E panels installed in a New York City multifamily building over windows with and without AC units showed that the effective leakage area of the windows was reduced by 77-95%. (c) To study the use of low-E storm windows in a warmer mixed climate with a balance of both heating and cooling, 10 older homes near Atlanta with single pane windows were tested with three types of exterior storm windows: clear glass, low-E glass with high solar heat gain, and low-E glass with lower solar heat gain. The storm windows significantly reduced the overall home air leakage by an average of 17%, or 3.7 ACH50. Considerably high variability in the data made it difficult to draw strong conclusions about the overall energy usage, but for heating periods, the low-E storm windows showed approximately 15% heating energy savings, whereas clear storm windows were neutral in performance. For cooling periods, the low-E storm windows showed a wide range of performance from 2% to over 30% cooling energy savings. Overall, the study showed the potential for significantly more energy savings from using low-E glass versus no storm window or clear glass storm windows in warmer mixed climates, but it is difficult to conclusively say whether one type of low-E performed

  3. Advanced Energy Retrofit Guide Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guopeng; Liu, Bing; Wang, Weimin; Zhang, Jian; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

    2011-09-27

    The Advanced Energy Retrofit Guide for Office Buildings is a component of the Department of Energy’s Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

  4. National Grid Deep Energy Retrofit Pilot

    Energy Technology Data Exchange (ETDEWEB)

    Neuhauser, K. [Building Science Corporation (BSC), Somervgille, MA (United States)

    2012-03-01

    Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance.

  5. Advanced Energy Retrofit Guide Retail Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guopeng; Liu, Bing; Zhang, Jian; Wang, Weimin; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

    2011-09-19

    The Advanced Energy Retrofit Guide for Retail Buildings is a component of the Department of Energy’s Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

  6. Pseudo-dynamic tests on masonry residential buildings seismically retrofitted by precast steel reinforced concrete walls

    Science.gov (United States)

    Li, Wenfeng; Wang, Tao; Chen, Xi; Zhong, Xiang; Pan, Peng

    2017-07-01

    A retrofitting technology using precast steel reinforced concrete (PSRC) panels is developed to improve the seismic performance of old masonry buildings. The PSRC panels are built up as an external PSRC wall system surrounding the existing masonry building. The PSRC walls are well connected to the existing masonry building, which provides enough confinement to effectively improve the ductility, strength, and stiffenss of old masonry structures. The PSRC panels are prefabricated in a factory, significantly reducing the situ work and associated construction time. To demonstrate the feasibility and mechanical effectivenss of the proposed retrofitting system, a full-scale five-story specimen was constructed. The retrofitting process was completed within five weeks with very limited indoor operation. The specimen was then tested in the lateral direction, which could potentially suffer sigifnicant damage in a large earthquake. The technical feasibility, construction workability, and seismic performance were thoroughly demonstrated by a full-scale specimen construction and pseudo-dynamic tests.

  7. Milliken Station Demonstration Project FDG retrofit update

    Energy Technology Data Exchange (ETDEWEB)

    Alder, R.C.; Jackson, C.E.; O`Dea, D.T. [and others

    1994-12-31

    The Milliken Clean Coal Demonstration Project is one of the nine Clean Coal Projects selected for funding in Round 4 of the U.S. DOE`s Clean Coal Demonstration Program. The project`s sponsor is New York State Electric and Gas Corporation (NYSEG). Project team members include CONSOL Inc., Saarberg-Holter-Umwelttechnik (SHU), NALCO/FuelTech, Stebbins Engineering and Manufacturing Co., DHR Technologies, and CE Air Preheater. Gilbert/Commonwealth is the Architect/Engineer and Construction Manager for the flue gas desulfurization (FGD) retrofit. The project will provide full-scale demonstration of a combination of innovative emission-reducing technologies and plant upgraded for the control of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from a coal-fired steam generator without a significant loss of station efficiency. The overall project goals are the following: 98% SO{sub 2} removal efficiency using limestone while burning high sulfur coal; up to 70% NO{sub x} reduction using the NOXOUT selective non-catalytic reduction (SNCR) technology in conjunction with combustion modifications; minimization of solid waste by producing marketable by-products including commercial grade gypsum, calcium chloride, and fly ash; zero wastewater discharge; maintenance of station efficiency by using a high efficiency heat-pipe air heater system and a low-power-consuming scrubber system. The demonstration project is being conducted at NYSEG`s Milliken Station, located in Lansing, New York. Milliken Station has two 150-MWe pulverized coal-fired units built in the 1950s by Combustion Engineering. The SHU FGD process and the combustion modifications are being installed on both units, but the NOXOUT process, Plant Economic Optimization Advisor (PEOA), and the high-efficiency air heater system will be installed on only one unit.

  8. Phased Retrofits in Existing Homes in Florida Phase I: Shallow and Deep Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Montemurno, J. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Kono, J. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-02-01

    The U.S. Department of Energy (DOE) Building America program, in collaboration with Florida Power and Light (FPL), conducted a phased residential energy-efficiency retrofit program. This research sought to establish impacts on annual energy and peak energy reductions from the technologies applied at two levels of retrofit - shallow and deep, with savings levels approaching the Building America program goals of reducing whole-house energy use by 40%. Under the Phased Deep Retrofit (PDR) project, we have installed phased, energy-efficiency retrofits in a sample of 56 existing, all-electric homes. End-use savings and economic evaluation results from the phased measure packages and single measures are summarized in this report.

  9. Diesel retrofit assessment for NYS DOT to retrofit its existing engine fleet.

    Science.gov (United States)

    2010-08-01

    The NYS DEC has required the use of retrofit technologies for various state agency, state public authority, and regional public authority heavy duty vehicles, as well as heavy duty vehicles used on behalf of such agencies and authorities. This report...

  10. [A focused sound field measurement system by LabVIEW].

    Science.gov (United States)

    Jiang, Zhan; Bai, Jingfeng; Yu, Ying

    2014-05-01

    In this paper, according to the requirement of the focused sound field measurement, a focused sound field measurement system was established based on the LabVIEW virtual instrument platform. The system can automatically search the focus position of the sound field, and adjust the scanning path according to the size of the focal region. Three-dimensional sound field scanning time reduced from 888 hours in uniform step to 9.25 hours in variable step. The efficiency of the focused sound field measurement was improved. There is a certain deviation between measurement results and theoretical calculation results. Focal plane--6 dB width difference rate was 3.691%, the beam axis--6 dB length differences rate was 12.937%.

  11. Glove port retrofit assembly and method of replacing components

    Science.gov (United States)

    Giesen, Isaac M; Cournoyer, Michael E; Rael, David G

    2014-11-18

    What is disclosed is a system for retrofitting a sealed enclosure for performing work therein having an outer enclosure assembly configured to be clamped to the outer annular face of a port ring and form a sealed engagement with the outer annular surface of the port ring, a change assembly having an inner ring and an access element wherein the inner ring has a first annular cylinder body that is sized to be slidably received by the port ring and the access element is configured to be sealably and slidably positioned within the first annular cylinder body of the inner ring.

  12. Heat exchanger network retrofit optimization involving heat transfer enhancement

    International Nuclear Information System (INIS)

    Wang Yufei; Smith, Robin; Kim, Jin-Kuk

    2012-01-01

    Heat exchanger network retrofit plays an important role in energy saving in process industry. Many design methods for the retrofit of heat exchanger networks have been proposed during the last three decades. Conventional retrofit methods rely heavily on topology modifications which often result in a long retrofit duration and high initial costs. Moreover, the addition of extra surface area to the heat exchanger can prove difficult due to topology, safety and downtime constraints. Both of these problems can be avoided through the use of heat transfer enhancement in heat exchanger network retrofit. This paper presents a novel design approach to solve heat exchanger network retrofit problems based on heat transfer enhancement. An optimisation method based on simulated annealing has been developed to find the appropriate heat exchangers to be enhanced and to calculate the level of enhancement required. The physical insight of enhanced exchangers is also analysed. The new methodology allows several possible retrofit strategies using different retrofit methods be determined. Comparison of these retrofit strategies demonstrates that retrofit modification duration and payback time are reduced when heat transfer enhancement is utilised. Heat transfer enhancement can be also used as a substitute for increased heat exchanger network surface area to reduce retrofit investment costs.

  13. The reHABITAT Guide: For Energy- and Resource-Efficient Retrofit Strategies; February 2003--February 2004

    Energy Technology Data Exchange (ETDEWEB)

    2004-07-01

    The reHABITAT Guide for Energy- and Resource-Efficient Retrofit Strategies seeks to advance the goal of the U.S. Department of Energy's Existing Residential Buildings Program (ERBP): to develop approaches that will enable the housing retrofit industry to deliver energy-efficient housing improvements and to ensure that energy-efficient retrofit technologies incorporated into projects are viable over conventional approaches. This guide was developed for Habitat for Humanity International and is the result of lessons learned from demonstration retrofit projects undertaken by Habitat for Humanity affiliates in Newburgh, New York; Baltimore, Maryland; and Philadelphia, Pennsylvania; with building systems consulting and technical assistance provided by Steven Winter Associates, Inc. (SWA).

  14. ECG based biometrics verification system using LabVIEW

    Directory of Open Access Journals (Sweden)

    Sunil Kumar Singla

    2010-07-01

    Full Text Available Biometric based authentication systems provide solutions to the problems in high security which remain with conventionalsecurity systems. In a biometric verification system, human’s biological parameters (such as voice, finger print,palm print or hand geometry, face, iris etc. are used to verify the authenticity of a person. These parameters are good to beused as biometric parameters but do not provide the guarantee that the person is present and alive. As voice can be copied,finger print can be picked from glass on synthetic skin and in face recognition system due to genetic factors identical twinsor father-son may have the same facial appearance. ECG does not have these problems. It can not be recorded without theknowledge of the person and ECG of every person is unique even identical twins have different ECG. In this paper an ECGbasedbiometrics verification system which was developed using Laboratory Virtual Instruments Engineering Workbench(LabVIEW version 7.1 is discussed. Experiments were conducted on the database stored in the laboratory of 20 individualshaving 10 samples each and the results revealed a false rejection rate (FRR of 3% and false acceptance rate (FAR of 3.21%.

  15. Phased Retrofits in Existing Homes In Florida Phase I: Shallow and Deep Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Montemurno, J. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Kono, J. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-02-04

    The U.S. Department of Energy (DOE) Building America program, in collaboration with Florida Power and Light (FPL), conducted a phased residential energy-efficiency retrofit program. This research sought to establish impacts on annual energy and peak energy reductions from the technologies applied at two levels of retrofit - shallow and deep, with savings levels approaching the Building America program goals of reducing whole-house energy use by 40%. Under the Phased Deep Retrofit (PDR) project, we have installed phased, energy-efficiency retrofits in a sample of 56 existing, all-electric homes. End-use savings and economic evaluation results from the phased measure packages and single measures are summarized in this report. Project results will be of interest to utility program designers, weatherization evaluators, and the housing remodel industry. Shallow retrofits were conducted in all homes from March to June 2013. The measures for this phase were chosen based on ease of installation, targeting lighting (CFLs and LED lamps), domestic hot water (wraps and showerheads), refrigeration (cleaning of coils), pool pump (reduction of operating hours), and the home entertainment center (smart plugs). Deep retrofits were conducted on a subset of ten PDR homes from May 2013 through March 2014. Measures included new air source heat pumps, duct repair, ceiling insulation, heat pump water heaters, variable speed pool pumps and learning thermostats. Major appliances such as refrigerators and dishwashers were replaced where they were old and inefficient.

  16. Fiscal and tax policy support for energy efficiency retrofit for existing residential buildings in China's northern heating region

    International Nuclear Information System (INIS)

    Li Dongyan

    2009-01-01

    Energy efficiency retrofit for existing residential buildings (EERERB) in China's northern heating region is an important component of the national energy strategy. The main content and related subject in EERERB performance is the basis of understanding and developing targeted policies. So, this paper designed the content system of EERERB. And then, provided a cost-benefit analysis on related subjects, assessed the government's function in EERERB, and come to the conclusion that the Chinese government should increase fiscal fund investment and implement more fiscal and tax incentive policies. Moreover, in view of China's current policy, which lacks long-term mechanism and flexibility, this paper proposed specific policy recommendations, including clarifying the government's corresponding responsibilities at all levels and increasing the intensity of the central government's transfer payments. It further proposed targeted financial and tax policies for supporting and encouraging heating enterprises and owners, as well as policies to cultivate energy-saving service markets and to support the ESCO.

  17. INDUSTRIAL BOILER RETROFIT FOR NOX CONTROL: COMBINED SELECTIVE NONCATALYTIC REDUCTION AND SELECTIVE CATALYTIC REDUCTION

    Science.gov (United States)

    The paper describes retrofitting and testing a 590 kW (2 MBtu/hr), oil-fired, three-pass, fire-tube package boiler with a combined selective noncatalytic reduction (SNCR) and selective catalytic reduction (SCR) system. The system demonstrated 85% nitrogen oxides (NOx) reduction w...

  18. National Grid Deep Energy Retrofit Pilot

    Energy Technology Data Exchange (ETDEWEB)

    Neuhauser, K.

    2012-03-01

    Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wider adoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gauge long-term energy performance, durability, and occupant comfort.

  19. Retrofitting the 5045 Klystron for Higher Efficiency

    International Nuclear Information System (INIS)

    Jensen, Aaron; Fazio, Michael; Haase, Andy; Jongewaard, Erik; Kemp, Mark; Neilson, Jeff

    2015-01-01

    The 5045 klystron has been in production and accelerating particles at SLAC National Accelerator Laboratory for over 25 years. Although the design has undergone some changes there are still significant opportunities for improvement in performance. Retrofitting the 5045 for higher efficiencies and a more mono-energetic spent beam profile is presented.

  20. Existing School Buildings: Incremental Seismic Retrofit Opportunities.

    Science.gov (United States)

    Federal Emergency Management Agency, Washington, DC.

    The intent of this document is to provide technical guidance to school district facility managers for linking specific incremental seismic retrofit opportunities to specific maintenance and capital improvement projects. The linkages are based on logical affinities, such as technical fit, location of the work within the building, cost saving…

  1. Energy Retrofit Creates an Efficient Building.

    Science.gov (United States)

    Freeman, Laurie

    1997-01-01

    After 20 years of inadequate heating and cooling, an Indiana school district took advantage of a 1994 state law that allows school districts to bypass the "low-bidder wins" restriction. The district established a guaranteed energy-saving contract for a climate-control-improvements package to retrofit the junior-senior high school. (MLF)

  2. Evaluation of Crawlspace Retrofits in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Rudd, A.

    2014-09-01

    In 2011 and early 2012, Building Science Corporation (BSC) collaborated with Innova Services Corporation on a multifamily community unvented crawlspace retrofit project at Oakwood Gardens in Lansdale, Pennsylvania. BSC provided design consulting services and pre- and post-retrofit evaluation, testing, and data monitoring. The existing condition was a vented crawlspace with an uninsulated floor between the crawlspace and the dwelling units above. The crawlspace was therefore a critically weak link in the building enclosure and was ripe for improvement. Saving energy was the primary interest and goal, but the greatest challenge in this unvented crawlspace retrofit project was working through a crawlspace bulk water intrusion problem caused by inadequate site drainage, window well drainage, foundation wall drainage, and a rising water table during rainy periods. While the unvented crawlspace retrofit was effective in reducing heat loss, and the majority of the bulk water drainage problems had been resolved, the important finding was that some of the wood joists embedded in masonry pockets behind the brick veneer were showing signs of moisture damage.

  3. DIESEL ENGINE RETROFIT TECHNOLOGY VERIFICATION (POSTER)

    Science.gov (United States)

    ETV is presenting a poster at the EPA's 2005 Science Forum from May 16-18, 2005 in Washington, DC. This poster will contain a summary of the performance results realized by the six verified diesel retrofit technologies, as well as potential impacts that could be realized if sigi...

  4. Performance of a Retrofitted Multicyclone for PM2.5 Emission Control

    Science.gov (United States)

    Dewika, M.; Rashid, M.; Ammar, M. R.

    2018-03-01

    This paper presents on the performance of a retrofitted multicyclone system, which aims to increase the collection efficiency of PM2.5 (i.e. particulate size fraction ≤ 2.5 μm) emission. The multicyclone was retrofitted by extracting 15% and 20% of the total volumetric air flow rate at the dust hopper of the unit using an additional Induced Draft Fan. The total collection efficiency with and without the extraction was measured at various air volumetric flow rates and particulate mass inlet concentration. The results showed that there was a reduction of 12% to 54% depending on the inlet concentration of PM2.5 emission in the stack with compared to without extraction increasing the collection efficiency of the retrofitted multicyclone. The finding suggests that a simple technique of applying gas extraction at the dust hopper of a multicyclone as reported in this study able to increase the overall performance in fine particulate collection.

  5. Strategy Guideline: Energy Retrofits for Low-Rise Multifamily Buildings in Cold Climates

    Energy Technology Data Exchange (ETDEWEB)

    Brozyna, K. [IBACOS, Inc., Pittsburgh, PA (United States); Badger, L. [Vermont Energy Investment Corporation, Burlington, VT (United States)

    2013-04-01

    This Strategy Guideline explains the benefits of evaluating and identifying energy efficiency retrofit measures that could be made during renovation and maintenance of multifamily buildings. It focuses on low-rise multifamily structures (three or fewer stories) in a cold climate. These benefits lie primarily in reduced energy use, lower operating and maintenance costs, improved durability of the structure, and increased occupant comfort. This guideline focuses on retrofit measures for roof repair or replacement, exterior wall repair or gut rehab, and eating system maintenance. All buildings are assumed to have a flat ceiling and a trussed roof, wood- or steel-framed exterior walls, and one or more single or staged boilers. Estimated energy savings realized from the retrofits will vary, depending on the size and condition of the building, the extent of efficiency improvements, the efficiency of the heating equipment, the cost and type of fuel, and the climate location.

  6. Usage of prestressed vertical bolts for retrofitting flat slabs damaged due to punching shear

    Directory of Open Access Journals (Sweden)

    Hamed S. Askar

    2015-09-01

    An experimental investigation with the objective of retrofitting flat slabs damaged due to punching shear using prestressed vertical bolts is presented in this paper. The parameters examined in this study are vertical prestressed bolts with different ratios within the slab thickness, slab thickness and central column size. Through the experimental tests the load carrying capacity, deformation characteristics and the cracking behavior have been investigated. A comparison between the behavior of retrofitted slabs and their references showed that the proposed system of repair is effective and could be used in practice. A comparison between the experimental results and calculated punching failure load based on the formulas adopted by different codes, showed a reasonable agreement.

  7. Old shovels with digital control technology retrofits give new units a run for their money

    Energy Technology Data Exchange (ETDEWEB)

    Duskey, M.R. [Avtron Manufacturing Inc., Cleveland, OH (United States)

    2006-04-15

    New digital drive control systems can be retrofitted to shovels and draglines to maximize their performance and keep them running smoothly and reliably. Case histories of successful retrofits are reported. The static drives on a Marion 310 DC drive shovel operating in British Columbia were replaced with Avtron Firing Modules to improve machine availability. Three old Bucyrus 295 M-G set-controlled shovels operated by mines in North Dakota and Labrador which were experiencing excessive downtime were replaced with an Avtron ADD-32DMG field regulator. 2 figs.

  8. Water sensitive urban design retrofits in Copenhagen - 40% to the sewer, 60% to the city

    DEFF Research Database (Denmark)

    Fryd, O.; Backhaus, Antje; Birch, Heidi

    2013-01-01

    Water Sensitive Urban Design (WSUD) is emerging in Denmark. This interdisciplinary desk study investigated the options for WSUD retrofitting in a 15 km(2) combined sewer catchment area in Copenhagen. The study was developed in collaboration with the City of Copenhagen and its water utility......, neighbourhoods located near low-lying streams and public parks are disconnected from the sewer system and the sloping terrain is utilised to convey runoff. Fourth, the promotion of coherent blue and green wedges in the city is linked with WSUD retrofits and urban climate-proofing. Fifth, WSUD is implemented...

  9. Seismic isolation retrofitting of the Salt Lake City and County Building

    International Nuclear Information System (INIS)

    Bailey, J.; Allen, E.

    1989-01-01

    The City and County Building, a massive unreinforced masonry structure completed in 1894, has been seismically retrofitted using base isolation. The isolation system consists of 443 lead-rubber isolators installed underneath the building on top of existing spread footings. The building is isolated from the surrounding ground by a perimeter moat wall, permitting lateral movement to take place during an earthquake. It is believed that this is the first historic structure in the world to be retrofitted against possible seismic damage using base isolation. Lessons learned in this design effort are potentially applicable to seismic base isolation for nuclear power plants

  10. Industrial wastewater treatment network based on recycling and rerouting strategies for retrofit design schemes

    DEFF Research Database (Denmark)

    Sueviriyapan, Natthapong; Suriyapraphadilok, Uthaiporn; Siemanond, Kitipat

    2015-01-01

    a generic model-based synthesis and design framework for retrofit wastewater treatment networks (WWTN) of an existing industrial process. The developed approach is suitable for grassroots and retrofit systems and adaptable to a wide range of wastewater treatment problems. A sequential solution procedure...... is employed to solve a network superstructure-based optimization problem formulated as Mixed Integer Linear and/or Non-Linear Programming (MILP/MINLP). Data from a petroleum refinery effluent treatment plant together with special design constraints are employed to formulate different design schemes based...... for the future development of the existing wastewater treatment process....

  11. An interior vessel viewing system for DIII-D

    International Nuclear Information System (INIS)

    Senior, R.

    1989-11-01

    It was anticipated that there could be damage to the interior walls of the vacuum vessel during operations of the DIII-D tokamak. A method of viewing the inside of the vessel from the outside was required, that would allow the interior walls to be inspected visually for damage and to locate any debris resulting from operations. A miniature closed circuit television color camera system was developed which could be inserted into one of several ports of the vessel during a 'clean' vent, i.e., vented to inert gas. The system has pan, tilt and zoom capability and carries its own lighting. The use of this system allows a quick assessment of the condition of the vessel to be made under 'clean' vent conditions. This precludes the need for the permit process and manned entry into the vessel which would allow air inside the vessel. A permanent record of the inspection can then be made on video tape. The design and configuration of this camera system is presented and its use as a diagnostic tool discussed. 2 refs., 5 figs

  12. Design of Kartini reactor radiation monitor system using lab view

    International Nuclear Information System (INIS)

    Adi Abimanyu; Jumari; Achmad Fahrul Aji; Muhammad Khoiri

    2014-01-01

    Kartini Reactor operation will result in radiation exposure. Gamma radiation exposure rate at the Kartini Reactor monitored by several radiation monitors (Ludlum) that integrate with the computer, so that the rate of radiation exposure is always monitored. Current monitoring system combines six radiation monitor in one computer monitor radiation, and monitoring performed by operators and supervisors to see how the radiation exposure rate measured in the area around the reactor core in a periodic time manually. This research will develop a system to monitor radiation exposure in Kartini reactor based ATMega8 micro controller for interface between radiation monitor and computer and also Graphical User Interface (GUI) develop using Lab view software that makes monitoring is easier and documented regularly. This system is testing by simulation, it is done by replacing the function of the radiation monitoring devices (Ludlum) in Kartini Reactor with computers that send serial data with the same format with a format that is sent by Ludlum. The results show that the interface system has the ability to operate in a range of baud rate 1,200 bps, 2,400 bps, 4,800 bps, 9,600 bps, 14,400 bps, 19,200 bps and 38,400 bps, with the ability to provide realtime information every 6 seconds and able to document the rate of exposure to radiation in the form of logbook. (author)

  13. Present states and views on vault storage systems

    International Nuclear Information System (INIS)

    Yoshimura, Eiji

    2003-01-01

    Storage capacity of spent nuclear fuel storage pools in nuclear power station is reaching to a condition near its limit, and under a condition inevitable on delay of the Pu-thermal utilization plan importance on interim storage of the spent nuclear fuels is further rising. In U.S.A., Germany, and so on, a condition incapable of presenting nuclear energy business itself without its intermediate storage is approaching, so in Japan it will also be a key to smoothly promote the nuclear energy business how the interim storage is used and operated. Under such condition, in Japan storage facilities using a system called by 'metal cask' are established at areas of nuclear power stations to begin their operations. As on the system expensive metal containers are used for storage in themselves, it has a demerit of its high cost. On the other hand, on foreign countries, a storing system called by concrete cask, horizontal silo, or vault is occupying its main stream. Here was introduced present states and future views on vault storage system. (G. K)

  14. The evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.; Shonder, J.A.

    1998-03-01

    This report documents an independent evaluation of an energy retrofit of 4,003 family housing units at Fort Polk, Louisiana, under an energy savings performance contract (ESPC). Replacement of the heating, cooling, and water heating systems in these housing units with geothermal heat pumps (GHPs) anchored the retrofit; low-flow shower heads and compact fluorescent lighting were also installed, as well as attic insulation where needed. Statistically valid findings indicate that the project will save 25.8 million kWh, or 32.5% of the pre-retrofit whole-community electrical consumption, and 100% of the whole-community natural gas previously used for space conditioning and water heating (260,000 therms) in a typical meteorological year. At the end-use level, the GHPs were found to save about 42% of the pre-retrofit electrical consumption for heating, cooling, and water heating in housing units that were all-electric in the pre-retrofit period. This report also demonstrates an improved method of predicting energy savings. Using an engineering model calibrated to pre-retrofit energy use data collected in the field, the method predicted actual energy savings on one of the electric feeders at Fort Polk with a very high degree of accuracy. The accuracy of this model was in turn dependent on data-calibrated models of the geothermal heat pump and ground heat exchanger that are described in this report. In addition this report documents the status of vertical borehole ground heat exchanger (BHEx) design methods at the time this project was designed, and demonstrates methods of using data collected from operating GHP systems to benchmark BHEx design methods against a detailed engineering model calibrated to date. The authors also discuss the ESPC`s structure and implementation and how the experience gained here can contribute to the success of future ESPCs.

  15. 60 kW{sub p} PV-system school centre Spalterhals Barsinghausen. Synergies in energetical retrofit of school building; 60-kW{sub p}-PV-Anlage Schulzentrum Spalterhals Barsinghausen. Synergien bei der energetischen Sanierung eines Schulgebaeudes

    Energy Technology Data Exchange (ETDEWEB)

    Blumenscheit, R.; Hettwer, C. [Stadt Barsinghausen (Germany); Diestelmeier, C.; Wiegmann, A. [Raumplan, Hannover (Germany); Decker, B.; Hennig, C.; Mack, M. [Solar Engineering Decker and Mack GmbH, Hannover (Germany)

    2004-07-01

    The completely building-integrated PV plant with a nominal power of 60.54 kW{sub p} uses synergies with constructional and energetical retrofit of a school building. The PV plant is operated by the town of Barsinghausen (30 km southwest of Hannover). The federal state of Lower Saxony gave a grant of 36,61%, the Hannover region of 12,39% to the total investment of 824.190 Euro (incl. building construction). The PV plant is divided into five units. PV modules serve as the curtain wall of heat-insulated building core (blue PV cold facade: 12.67 kW{sub p}, grey PV breastwork: 8,38 kW{sub p}). Semitransparent PV modules substitute the insulating glass shed lights of a music room (4,28 kW{sub p}) and the glass roofing of an inner court (12,17 kW{sub p} - all modules: Solarnova) giving an optimum of sun-shading and daylighting. Thin-film PV modules on plastic foils (23,04 kW{sub p} - Alwitra EVALON Solar, Unisolar amorphous Si cells) are tested as flat roof standard retrofit. The PV system has 29 string inverters mostly of SMA Sunny Boy family mounted near to the PV modules in operational rooms or in crawling cellars. The PV operator gets a reimbursement of 0,481 Euro per kWh PV energy according to EEG. The PV system is monitored in detail within 'Solaroffensive' of Lower Saxony. Visualization tableaus inform the public about actual irradiance, actual power and annual energy. (orig.) [German] Schulgebaeude und insbesondere grosse Schulzentren aus den 70er Jahren haben geeignete Dachflaechen zur Errichtung von grossen PV-Anlagen (typisch >1.000 m{sup 2}). Zugleich sind Schulen ein idealer Ort, um vor breitem Publikum (Schueler, Lehrer, Eltern) Planung, Installation und Betrieb einer PV-Anlage zu demonstrieren. In Barsinghausen, am Fusse des Deisters etwa 30 km suedwestlich von Hannover, entstand zwischen August 2001 und Maerz 2003 eine innovative PV-Modellanlage am Schulzentrum 'Am Spalterhals', die verschiedene Arten der PV-Gebaeudeintegration erprobt

  16. Multi-views storage model and access methods of conversation history in converged IP messaging system

    Science.gov (United States)

    Lu, Meilian; Yang, Dong; Zhou, Xing

    2013-03-01

    Based on the analysis of the requirements of conversation history storage in CPM (Converged IP Messaging) system, a Multi-views storage model and access methods of conversation history are proposed. The storage model separates logical views from physical storage and divides the storage into system managed region and user managed region. It simultaneously supports conversation view, system pre-defined view and user-defined view of storage. The rationality and feasibility of multi-view presentation, the physical storage model and access methods are validated through the implemented prototype. It proves that, this proposal has good scalability, which will help to optimize the physical data storage structure and improve storage performance.

  17. Melter viewing system for liquid-fed ceramic melters

    International Nuclear Information System (INIS)

    Westsik, J.H. Jr.; Brenden, B.B.

    1988-01-01

    Melter viewing systems are an integral component of the monitoring and control systems for liquid-fed ceramic melters. The Pacific Northwest Laboratory (PNL) has designed cameras for use with glass melters at PNL, the Hanford Waste Vitrification Plant (HWVP), and West Valley Demonstration Project (WVDP). This report is a compilation of these designs. Operating experiences with one camera designed for the PNL melter are discussed. A camera has been fabricated and tested on the High-Bay Ceramic Melter (HBCM) and the Pilot-Scale Ceramic Melter (PSCM) at PNL. The camera proved to be an effective tool for monitoring the cold cap formed as the feed pool developed on the molten glass surface and for observing the physical condition of the melter. Originally, the camera was built to operate using the visible light spectrum in the melter. It was later modified to operate using the infrared (ir) spectrum. In either configuration, the picture quality decreases as the size of the cold cap increases. Large cold caps cover the molten glass, reducing the amount of visible light and reducing the plenum temperatures below 600 0 C. This temperature corresponds to the lowest level of blackbody radiation to which the video tube is sensitive. The camera has been tested in melter environments for about 1900 h. The camera has withstood mechanical shocks and vibrations. The cooling system in the camera has proved effective in maintaining the optical and electronic components within acceptable temperature ranges. 10 refs., 15 figs

  18. Video System for Viewing From a Remote or Windowless Cockpit

    Science.gov (United States)

    Banerjee, Amamath

    2009-01-01

    A system of electronic hardware and software synthesizes, in nearly real time, an image of a portion of a scene surveyed by as many as eight video cameras aimed, in different directions, at portions of the scene. This is a prototype of systems that would enable a pilot to view the scene outside a remote or windowless cockpit. The outputs of the cameras are digitized. Direct memory addressing is used to store the data of a few captured images in sequence, and the sequence is repeated in cycles. Cylindrical warping is used in merging adjacent images at their borders to construct a mosaic image of the scene. The mosaic-image data are written to a memory block from which they can be rendered on a head-mounted display (HMD) device. A subsystem in the HMD device tracks the direction of gaze of the wearer, providing data that are used to select, for display, the portion of the mosaic image corresponding to the direction of gaze. The basic functionality of the system has been demonstrated by mounting the cameras on the roof of a van and steering the van by use of the images presented on the HMD device.

  19. Interactive Computer-Enhanced Remote Viewing System (ICERVS)

    International Nuclear Information System (INIS)

    1993-08-01

    The Integrated Computer-Enhanced Remote Viewing System (ICERVS) supports the robotic remediation of hazardous environments such as underground storage tanks, buried waste sites, and contaminated production facilities. The success of these remediation missions will depend on reliable geometric descriptions of the work environment in order to achieve effective task planning, path planning, and collision avoidance. ICERVS provides a means for deriving a reliable geometric description more effectively and efficiently than current systems by combining a number of technologies: Sensing of the environment to acquire dimensional and material property data; integration of acquired data into a common data structure (based on octree technology); presentation of data to robotic task planners for analysis and visualization; interactive synthesis of geometric/surface models to denote features of interest in the environment and transfer of this information to robot control and collision avoidance systems. A key feature of ICERVS is that it will enable an operator to match xyz data from a sensor with surface models of the same region in space. This capability will help operators to better manage the complexities of task and path planning in three-dimensional (3D) space, thereby leading to safer and more effective remediation. The Phase 1 work performed by MTI has brought the ICERVS design to Maturity Level 3, Subscale Major Subsystem, and met the established success criteria

  20. Distribution and Room Air Mixing Risks to Retrofitted Homes

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A. [IBACOS, Inc., Pittsburgh, PA (United States)

    2014-12-01

    An energy efficiency upgrade reduces a home’s heating and cooling load. If the load reduction is great enough and the heating, ventilation, and air conditioning system warrants replacement, that system is often upgraded with a more efficient, lower capacity system that meets the load of the upgraded house. For a single-story house with floor supply air diffusers, the ducts often are removed and upgraded. For houses with ducts that are embedded in walls, the cost of demolition precludes the replacement of ducts. The challenge with the use of existing ducts is that the reduced airflow creates a decreased throw at the supply registers, and the supply air and room air do not mix well, leading to potential thermal comfort complaints. This project investigates this retrofit scenario. The issues and solutions discussed here are relevant to all climate zones, with emphasis on climates that require cooling. In this project, IBACOS performed load calculations for a two-story 1960s house and characterized duct sizes and layouts based on industry “rules of thumb” (Herk et al. 2014). The team performed duct-sizing calculations for unaltered ducts and post-retrofit airflows and examined airflow velocities and pressure changes with respect to various factors. The team then used a mocked-up duct and register setup to measure the characteristics of isothermal air—to reduce the effects of buoyancy from the observations—passing through the duct and leaving the register.

  1. Analysis of institutional mechanisms affecting residential and commercial buildings retrofit

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Barriers to energy conservation in the residential and commercial sectors influence (1) the willingness of building occupants to modify their energy usage habits, and (2) the willingness of building owners/occupants to upgrade the thermal characteristics of the structures within which they live or work and the appliances which they use. The barriers that influence the willingness of building owners/occupants to modify the thermal efficiency characteristics of building structures and heating/cooling systems are discussed. This focus is further narrowed to include only those barriers that impede modifications to existing buildings, i.e., energy conservation retrofit activity. Eight barriers selected for their suitability for Federal action in the residential and commercial sectors and examined are: fuel pricing policies that in the short term do not provide enough incentive to invest in energy conservation; high finance cost; inability to evaluate contractor performance; inability to evaluate retrofit products; lack of well-integrated or one-stop marketing systems (referred to as lack of delivery systems); lack of precise or customized information; lack of sociological/psychological incentives; and use of the first-cost decision criterion (expanded to include short-term payback criterion for the commercial sector). The impacts of these barriers on energy conservation are separately assessed for the residential and commercial sectors.

  2. Retrofit of heat exchanger networks with pressure recovery of process streams at sub-ambient conditions

    International Nuclear Information System (INIS)

    Onishi, Viviani C.; Ravagnani, Mauro A.S.S.; Caballero, José A.

    2015-01-01

    Highlights: • New mathematical model for heat exchanger networks retrofit with pressure recovery. • Optimal heat and work integration applied to the retrofit of sub-ambient processes. • Streams pressure manipulation is used to enhance heat integration of the system. • Compressors and turbines can act on a coupling shaft and/or as stand-alone equipment. • Use of smaller amount of cold utilities, reducing significantly the operational costs. - Abstract: This paper presents a new mathematical programming model for the retrofit of heat exchanger networks (HENs), wherein the pressure recovery of process streams is conducted to enhance heat integration. Particularly applied to cryogenic processes, HENs retrofit with combined heat and work integration is mainly aimed at reducing the use of expensive cold services. The proposed multi-stage superstructure allows the increment of the existing heat transfer area, as well as the use of new equipment for both heat exchange and pressure manipulation. The pressure recovery of streams is carried out simultaneously with the HEN design, such that the process conditions (streams pressure and temperature) are variables of optimization. The mathematical model is formulated using generalized disjunctive programming (GDP) and is optimized via mixed-integer nonlinear programming (MINLP), through the minimization of the retrofit total annualized cost, considering the turbine and compressor coupling with a helper motor. Three case studies are performed to assess the accuracy of the developed approach, including a real industrial example related to liquefied natural gas (LNG) production. The results show that the pressure recovery of streams is efficient for energy savings and, consequently, for decreasing the HEN retrofit total cost especially in sub-ambient processes

  3. The Improved Dual-view Field Goniometer System FIGOS

    Directory of Open Access Journals (Sweden)

    Klaus I. Itten

    2008-08-01

    Full Text Available In spectrodirectional Remote Sensing (RS the Earth’s surface reflectance characteristics are studied by means of their angular dimensions. Almost all natural surfaces exhibit an individual anisotropic reflectance behaviour due to the contrast between the optical properties of surface elements and background and the geometric surface properties of the observed scene. The underlying concept, which describes the reflectance characteristic of a specific surface area, is called the bidirectional reflectance distribution function (BRDF. BRDF knowledge is essential for both correction of directional effects in RS data and quantitative retrieval of surface parameters. Ground-based spectrodirectional measurements are usually performed with goniometer systems. An accurate retrieval of the bidirectional reflectance factors (BRF from field goniometer measurements requires hyperspectral knowledge of the angular distribution of the reflected and the incident radiation. However, prior to the study at hand, no operational goniometer system was able to fulfill this requirement. This study presents the first dual-view field goniometer system, which is able to simultaneously collect both the reflected and the incident radiation at high angular and spectral resolution and, thus, providing the necessary spectrodirectional datasets to accurately retrieve the surface specific BRF. Furthermore, the angular distribution of the incoming diffuse radiation is characterized for various atmospheric conditions and the BRF retrieval is performed for an artificial target and compared to laboratory spectrodirectional measurement results obtained with the same goniometer system. Suggestions for further improving goniometer systems are given and the need for intercalibration of various goniometers as well as for standardizing spectrodirectional measurements is expressed.

  4. Achievements and suggestions of heat metering and energy efficiency retrofit for existing residential buildings in northern heating regions of China

    International Nuclear Information System (INIS)

    Yan Ding; Zhe Tian; Yong Wu; Neng Zhu

    2011-01-01

    In order to promote energy efficiency and emission reduction, the importance of improving building energy efficiency received sufficient attention from Chinese Government. The heat metering and energy efficiency retrofit for existing residential buildings of 0.15 billion m 2 in northern heating regions of China was initiated in 2007 and completed successfully at the end of 2010. This article introduced the background and outline of the retrofit project during the period of 11th five-year plan. Numerous achievements that received by retrofit such as environmental protection effect, improvement of indoor environment, improvement of heating system, investment guidance effect, promotion of relevant industries and increasing chances of employment were concluded. Valuable experience that acquired from the retrofit project during the period of 11th five-year plan was also summarized in this article. By analyzing the main problems emerged in the past, pertinent suggestions were put forward to promote a larger scale and more efficient retrofit project in the period of 12th five-year plan. - Highlights: →Successful implementation of a retrofit project in China is introduced. → Significance of the project contributing to emission reduction is analyzed. →Achievements are summarized and future suggestions are put forward.

  5. Life as physics and chemistry: A system view of biology.

    Science.gov (United States)

    Baverstock, Keith

    2013-04-01

    Cellular life can be viewed as one of many physical natural systems that extract free energy from their environments in the most efficient way, according to fundamental physical laws, and grow until limited by inherent physical constraints. Thus, it can be inferred that it is the efficiency of this process that natural selection acts upon. The consequent emphasis on metabolism, rather than replication, points to a metabolism-first origin of life with the adoption of DNA template replication as a second stage development. This order of events implies a cellular regulatory system that pre-dates the involvement of DNA and might, therefore, be based on the information acquired as peptides fold into proteins, rather than on genetic regulatory networks. Such an epigenetic cell regulatory model, the independent attractor model, has already been proposed to explain the phenomenon of radiation induced genomic instability. Here it is extended to provide an epigenetic basis for the morphological and functional diversity that evolution has yielded, based on natural selection of the most efficient free energy transduction. Empirical evidence which challenges the current genetic basis of cell and molecular biology and which supports the above proposal is discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. A system view and analysis of essential hypertension.

    Science.gov (United States)

    Botzer, Alon; Grossman, Ehud; Moult, John; Unger, Ron

    2018-05-01

    The goal of this study was to investigate genes associated with essential hypertension from a system perspective, making use of bioinformatic tools to gain insights that are not evident when focusing at a detail-based resolution. Using various databases (pathways, Genome Wide Association Studies, knockouts etc.), we compiled a set of about 200 genes that play a major role in hypertension and identified the interactions between them. This enabled us to create a protein-protein interaction network graph, from which we identified key elements, based on graph centrality analysis. Enriched gene regulatory elements (transcription factors and microRNAs) were extracted by motif finding techniques and knowledge-based tools. We found that the network is composed of modules associated with functions such as water retention, endothelial vasoconstriction, sympathetic activity and others. We identified the transcription factor SP1 and the two microRNAs miR27 (a and b) and miR548c-3p that seem to play a major role in regulating the network as they exert their control over several modules and are not restricted to specific functions. We also noticed that genes involved in metabolic diseases (e.g. insulin) are central to the network. We view the blood-pressure regulation mechanism as a system-of-systems, composed of several contributing subsystems and pathways rather than a single module. The system is regulated by distributed elements. Understanding this mode of action can lead to a more precise treatment and drug target discovery. Our analysis suggests that insulin plays a primary role in hypertension, highlighting the tight link between essential hypertension and diseases associated with the metabolic syndrome.

  7. CASE HISTORY OF FINE PORE DIFFUSER RETROFIT AT RIDGEWOOD, NEW JERSEY

    Science.gov (United States)

    In April 1983, the Ridgewood, New Jersey Wastewater Treatment Plant underwent a retrofit from a coarse bubble to a fine pore aeration system. Also, process modification from contact stabilization to tapered aeration occurred. This report presents a case history of plant and aer...

  8. OFF-GAS ANALYSIS RESULTS AND FINE PORE RETROFIT INFORMATION FOR GLASTONBURY, CONNECTICUT

    Science.gov (United States)

    In the summer of 1984, the Glastonbury, Connecticut Water Pollution Control Plant underwent a retrofit from a spiral roll coarse bubble to a spiral roll fine pore aeration system. Only diffuser replacement was performed in the aeration tanks. From November 1985 through Septembe...

  9. OFF-GAS ANALYSIS RESULTS AND FINE PORE RETROFIT CASE HISTORY FOR HARTFORD, CONNECTICUT

    Science.gov (United States)

    In the summer of 1982, the Hartford Metropolitan District Commission, Hartford County, Connecticut, Water Pollution Control Facility underwent a retrofit form a spiral roll coarse bubble to a full floor coverage fine pore aeration system. Work performed included all new in-tank ...

  10. HVAC retrofit evaluations: Persuading owners to do it right

    Energy Technology Data Exchange (ETDEWEB)

    Linford, R.G. [Linford (Robert G.), Oakland, CA (United States)

    1997-11-01

    HVAC system retrofit evaluations for commercial buildings are complex and, at best, imperfect. The number of variables even for a simple system is large. For a complex system, they can be nearly overwhelming. One of the most difficult questions owners of older buildings face is to decide when is it cost effective to replace or upgrade the HVAC system rather than to repair (or ignore) specific components. Similarly, two of the major questions a prospective buyer faces in evaluating a building during the due diligence process are: how well does the HVAC system work today, and how well will it work in the future and at what cost? These are addressed in this article.

  11. Retrofit California Overview and Final Reports

    Energy Technology Data Exchange (ETDEWEB)

    Choy, Howard; Rosales, Ana

    2014-03-01

    Energy efficiency retrofits (also called upgrades) are widely recognized as a critical component to achieving energy savings in the building sector to help lower greenhouse gas (GHG) emissions. To date, however, upgrades have accounted for only a small percentage of aggregate energy savings in building stock, both in California and nationally. Although the measures and technologies to retrofit a building to become energy efficient are readily deployed, establishing this model as a standard practice remains elusive. Retrofit California sought to develop and test new program models to increase participation in the energy upgrade market in California. The Program encompassed 24 pilot projects, conducted between 2010 and mid-2013 and funded through a $30 million American Recovery and Reinvestment Act (ARRA) grant from the U.S. Department of Energy’s (DOE) Better Buildings Neighborhood Program (BBNP). The broad scope of the Program can be seen in the involvement of the following regionally based Grant Partners: Los Angeles County (as prime grantee); Association of Bay Area Governments (ABAG), consisting of: o StopWaste.org for Alameda County o Regional Climate Protection Authority (RCPA) for Sonoma County o SF Environment for the City and County of San Francisco o City of San Jose; California Center for Sustainable Energy (CCSE) for the San Diego region; Sacramento Municipal Utilities District (SMUD). Within these jurisdictions, nine different types of pilots were tested with the common goal of identifying, informing, and educating the people most likely to undertake energy upgrades (both homeowners and contractors), and to provide them with incentives and resources to facilitate the process. Despite its limited duration, Retrofit California undoubtedly succeeded in increasing awareness and education among home and property owners, as well as contractors, realtors, and community leaders. However, program results indicate that a longer timeframe will be needed to

  12. Cascade Apartments: Deep Energy Multifamily Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mattheis, L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kunkle, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Howard, L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lubliner, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-02-01

    In December of 2009-10, King County Housing Authority (KCHA) implemented energy retrofit improvements in the Cascade multifamily community, located in Kent, Washington (marine climate.)This research effort involved significant coordination from stakeholders KCHA, WA State Department of Commerce, utility Puget Sound Energy, and Cascade tenants. This report focuses on the following three primary BA research questions : 1. What are the modeled energy savings using DOE low income weatherization approved TREAT software? 2. How did the modeled energy savings compare with measured energy savings from aggregate utility billing analysis? 3. What is the Savings to Investment Ratio (SIR) of the retrofit package after considering utility window incentives and KCHA capitol improvement funding.

  13. Cold Climate Foundation Retrofit Energy Savings: The Simulated Energy and Experimental Hygrothermal Performance of Cold Climate Foundation Wall Insulation Retrofit Measures -- Phase I, Energy Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, L. F.; Steigauf, B.

    2013-04-01

    A split simulation whole building energy/3-dimensional earth contact model (termed the BUFETS/EnergyPlus Model or BEM) capable of modeling the full range of foundation systems found in the target retrofit housing stock has been extensively tested. These foundation systems that include abovegrade foundation walls, diabatic floors or slabs as well as lookout or walkout walls, currently cannot be modeled within BEopt.

  14. Cold Climate Foundation Retrofit Energy Savings. The Simulated Energy and Experimental Hygrothermal Performance of Cold Climate Foundation Wall Insulation Retrofit Measures -- Phase I, Energy Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, Louise F. [NorthernSTAR Building America Partnership, Minneapolis, MN (United States); Steigauf, Brianna [NorthernSTAR Building America Partnership, Minneapolis, MN (United States)

    2013-04-01

    A split simulation whole building energy / 3-dimensional earth contact model (termed the BUFETS/EnergyPlus Model or BEM) capable of modeling the full range of foundation systems found in the target retrofit housing stock has been extensively tested. These foundation systems that include abovegrade foundation walls, diabatic floors or slabs as well as lookout or walkout walls, currently cannot be modeled within BEopt.

  15. Retrofitted green roofs and walls and improvements in thermal comfort

    Science.gov (United States)

    Feitosa, Renato Castiglia; Wilkinson, Sara

    2017-06-01

    Increased urbanization has led to a worsening in the quality of life for many people living in large cities in respect of the urban heat island effect and increases of indoor temperatures in housing and other buildings. A solution may be to retrofit existing environments to their former conditions, with a combination of green infrastructures applied to existing walls and rooftops. Retrofitted green roofs may attenuate housing temperature. However, with tall buildings, facade areas are much larger compared to rooftop areas, the role of green walls in mitigating extreme temperatures is more pronounced. Thus, the combination of green roofs and green walls is expected to promote a better thermal performance in the building envelope. For this purpose, a modular vegetated system is adopted for covering both walls and rooftops. Rather than temperature itself, the heat index, which comprises the combined effect of temperature and relative humidity is used in the evaluation of thermal comfort in small scale experiments performed in Sydney - Australia, where identical timber framed structures prototypes (vegetated and non-vegetated) are compared. The results have shown a different understanding of thermal comfort improvement regarding heat index rather than temperature itself. The combination of green roof and walls has a valid role to play in heat index attenuation.

  16. Retrofit of ammonia plant for improving energy efficiency

    International Nuclear Information System (INIS)

    Panjeshahi, M.H.; Ghasemian Langeroudi, E.; Tahouni, N.

    2008-01-01

    The aim of this work is to perform a retrofit study of an ammonia plant, in purpose of improving energy efficiency. As a common practice, one can divide an ammonia plant into two parts: the hot-end and the cold-end. In the hot section, two different options are investigated that both lead to a threshold condition and achieve maximum energy saving. The first option covers only process-to-process energy integration, while the second option considers some modification in the convection section of the primary reformer through a new arrangement of the heating coils. Thus, a considerable reduction in cooling water, HP steam and fuel gas consumption is achieved. In the cold section, retrofit study is dominated by reducing the amount of shaft work or power consumption in the refrigeration system. Application of the Combined Pinch and Exergy Analysis revealed that part of the shaft work, which was originally being used, was inefficient and could have been avoided in a well-integrated design. Therefore, by proposing optimum refrigeration levels, reasonable saving (15%) in power consumption was observed without the need for new investment

  17. Evaluating the Dynamic Characteristics of Retrofitted RC Beams

    International Nuclear Information System (INIS)

    Ghods, Amir S.; Esfahani, Mohamad R.; Moghaddasie, Behrang

    2008-01-01

    The aim of this experimental study was to investigate the relationship between the damage and changes in dynamic characteristics of reinforced concrete members strengthened with Carbon Fiber Reinforced Polymer (CFRP). Modal analysis is a popular non-destructive method for evaluating health of structural systems. A total of 8 reinforced concrete beams with similar dimensions were made using concrete with two different compressive strengths and reinforcement ratios. Monotonic loading was applied with four-point-bending setup in order to generate different damage levels in the specimens while dynamic testing was conducted to monitor the changes in dynamic characteristics of the specimens. In order to investigate the effect of CFRP on static and dynamic properties of specimens, some of the beams were loaded to half of their ultimate load carrying capacity and then were retrofitted using composite laminates with different configuration. Retrofitted specimens demonstrated elevated load carrying capacity, higher flexural stiffness and lower displacement ductility. By increasing the damage level in specimens, frequencies of the beams were decreased and after strengthening these values were improved significantly. The intensity of the damage level in each specimen affects the shape of its mode as well. Fixed points and curvatures of mode shapes of beams tend to move toward the location of the damage in each case

  18. Experimental and numerical results from hybrid retrofitted photovoltaic panels

    International Nuclear Information System (INIS)

    Rossi, Cecilia; Tagliafico, Luca A.; Scarpa, Federico; Bianco, Vincenzo

    2013-01-01

    Highlights: • The experimental study focuses on the feasibility of hybrid PV/T panels retrofitting. • The critical role of a thin layer of air between PV panel and back plate is evidenced. • The benefit of the addition of a conductive paste layer is analyzed via FEM simulations. • The use of wood ribs to stick the back plate represents a cheap effective solution. - Abstract: The aim of present study is to investigate different methodologies to achieve a better contact between a photovoltaic panel and a thermal plate, in order to cool the PV panel by means of water in the perspective of coupling it with a heat pump. It is believed that this kind of system allows to obtain a higher energy efficiency. The analysis is developed both experimentally and numerically, testing different kinds of configurations in different operating conditions. Simulations are employed to analyze the effect of the variations of the contact resistance between the panel and the thermal plates, demonstrating that the use of a conductive paste increases the overall performance of the panel. Results show interesting possibilities in terms of retrofitting of existing photovoltaic panels by employing very simple solutions, such as to fix the thermal plate on the rear of the panel by means of wood ribs

  19. Comparison of Home Retrofit Programs in Wisconsin

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham, Kerrie [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Hannigan, Eileen [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership

    2013-03-01

    To explore ways to reduce customer barriers and increase home retrofit completions, several different existing home retrofit models have been implemented in the state of Wisconsin. This study compared these programs' performance in terms of savings per home and program cost per home to assess the relative cost-effectiveness of each program design. However, given the many variations in these different programs, it is difficult to establish a fair comparison based on only a small number of metrics. Therefore, the overall purpose of the study is to document these programs' performance in a case study approach to look at general patterns of these metrics and other variables within the context of each program. This information can be used by energy efficiency program administrators and implementers to inform home retrofit program design. Six different program designs offered in Wisconsin for single-family energy efficiency improvements were included in the study. For each program, the research team provided information about the programs' approach and goals, characteristics, achievements and performance. The program models were then compared with performance results-program cost and energy savings-to help understand the overall strengths and weaknesses or challenges of each model.

  20. Comparison of Home Retrofit Programs in Wisconsin

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham, K.; Hannigan, E.

    2013-03-01

    To explore ways to reduce customer barriers and increase home retrofit completions, several different existing home retrofit models have been implemented in the state of Wisconsin. This study compared these programs' performance in terms of savings per home and program cost per home to assess the relative cost-effectiveness of each program design. However, given the many variations in these different programs, it is difficult to establish a fair comparison based on only a small number of metrics. Therefore, the overall purpose of the study is to document these programs' performance in a case study approach to look at general patterns of these metrics and other variables within the context of each program. This information can be used by energy efficiency program administrators and implementers to inform home retrofit program design. Six different program designs offered in Wisconsin for single-family energy efficiency improvements were included in the study. For each program, the research team provided information about the programs' approach and goals, characteristics, achievements and performance. The program models were then compared with performance results -- program cost and energy savings -- to help understand the overall strengths and weaknesses or challenges of each model.

  1. The Retrofit Puzzle Extended: Optimal Fleet Owner Behavior over Multiple Time Periods

    Science.gov (United States)

    2009-08-04

    In "The Retrofit Puzzle: Optimal Fleet Owner Behavior in the Context of Diesel Retrofit Incentive Programs" (1) an integer program was developed to model profit-maximizing diesel fleet owner behavior when selecting pollution reduction retrofits. Flee...

  2. Heading towards the nZEB through CHP+HP systems. A comparison between retrofit solutions able to increase the energy performance for the heating and domestic hot water production in residential buildings

    International Nuclear Information System (INIS)

    Salata, Ferdinando; Golasi, Iacopo; Domestico, Umberto; Banditelli, Matteo; Lo Basso, Gianluigi; Nastasi, Benedetto; Lieto Vollaro, Andrea de

    2017-01-01

    Highlights: • Energy optimization measures to increase the energy class of buildings. • Analysis of the demands related to the space-heating season and the production of annual DHW. • Case study related to a residential building of medium size located in Rome (Italy). • Improvements on building envelope and on systems (traditional technologies or CHP+HP). • Energy and economic analysis to achieve the performance of a nZEB. - Abstract: Optimizing consumptions in the field of civil construction led to define energy labels for residential buildings. To calculate the building energy demand the EPgl was determined, i.e. the annual consumption per m"2 of primary energy. This paper examines the technical solutions useful to optimize the energy demands for heating during space-heating season and domestic hot water production (thanks to energy analysis softwares as MC11300 and TRNSYS) and, at the same time, to take into account the financial issues those interventions implied. The total inside heated surface of the building case study is 1204.00 m"2, hence the inside heated volume is about 3250.80 m"3. Besides the more traditional interventions concerning the building envelope and its systems, the paper examined the performance of a system obtained through the combination of a cogenerator (CHP) and a heat pump (HP), thus, substituting the conventional boilers of the buildings. CHP+HP solution increases the most the energy label of the building (from a D class with EPgl = 59.62 kW h m"−"2 year"−"1, to an A class, with EPgl = 25.64 kW h m"−"2 year"−"1), determining an annual energy cost saving of 3,114 € year"−"1, allowing to amortize installation costs (54,560 €) in a reasonable payback period, i.e. 15.4 years. This innovative solution in the residential sector can be realized through retrofit interventions on existing buildings, hence it leads the current dwelling towards nZEB with a remarkable benefits for the environment.

  3. Comparative study of commercial building energy-efficiency retrofit policies in four pilot cities in China

    International Nuclear Information System (INIS)

    Hou, Jing; Liu, Yisheng; Wu, Yong; Zhou, Nan; Feng, Wei

    2016-01-01

    The energy efficiency of existing commercial buildings is more challenging to regulate and improve than the energy efficiency of new constructions. In 2011 and 2012, the Chinese Government selected four cities- Shanghai, Tianjin, Shenzhen, and Chongqing- to implement pilot commercial building energy efficiency retrofit program. Based on site surveys and expert interviews in these pilot cities, this research conducted a comparative analysis on incentive policies of local city level. The analysis results show that policy designs of existing commercial buildings should be further improved. The aspects that influence the implementation effect in the future, such as subsidy level, installments, and business model promotion, should be specified in the policy clauses. Referring to the technical solution and cost-benefit in Chongqing, we found that lighting system is the most common retrofit objects while envelope system is the least common one. And the subsidy incentive is greatest for educational buildings, followed by office buildings. In the end, we further discussed the problems and obstacles in commercial building retrofit market, and provided a series of recommendations. - Highlights: • Data and information were collected through site surveys to the four pilot cities. • Policy design and effectiveness in four cities were comparatively analyzed. • Well-designed policy increases market response, energy savings and EMC adoption. • Lighting is the most common retrofit while envelope is the least common one. • Subsidy incentive is greatest for educational buildings due to the utility tariff.

  4. Experimental Air-Tightness Analysis in Mediterranean Buildings after Windows Retrofit

    Directory of Open Access Journals (Sweden)

    Francesca Romana d’Ambrosio Alfano

    2016-09-01

    Full Text Available Energy saving and Indoor Air Quality (IAQ in buildings are strongly affected by air leakages. Several studies reveal that the energy loss owing to leaky windows can account for up to 40% of the total building energy demand. Furthermore, at the design stage, the possible infiltration of outdoor air through windows is not taken into account when determining the nominal outdoor airflow rate of the ventilation system. This practice may result in an oversizing of the ventilation system and consequent energy waste. Thus, the air-tightness class of a wall assembly should be assessed for each window component considering the type of material, the presence of the seal, the type of closure, the sealing and the maintenance condition. In this paper, the authors present the experimental results of air-tightness measurements carried out using the fan pressurization method in three residential buildings located in the Mediterranean region before and after a window retrofit. Two different window retrofits were investigated: the application of rubber seals on window frames and the substitution of existing windows with new certified high performance windows. The effectiveness of such retrofits was estimated also in terms of energy saving. Test results demonstrated a high variability of the building air tightness after window retrofits, despite the fact that air tight–certified windows were used.

  5. Special requirements for the fluid mechanical design of hard coal-fired SCR retrofit units

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The system design of high-dust SCR units for retrofits is a challenge that is to be mastered in order to meet the fluid mechanical requirements. Retrofitting power plants with NOx control technologies is a cost-intensive adventure that many utilities are undertaking. Except for a few recent new boiler installations, SCR installations must be considered as retrofit projects. In most cases the limitation of space on site entails unfavorable conditions that do not allow appropriate upstream conditions for SCR catalysts. To comply with the requirements of high performance DeNOx systems and to lower the investment costs for retrofit units, several technical solutions and concepts for the reactor layout, for NOx and dust distribution, for flow stabilization in diffusers, and advanced ammonia injection systems are explained in this paper. Balcke-Duerr offers customer-tailored solutions for flow optimization, which are evaluated by model studies. Physical flow and dust model tests in an appropriate scale provide flexibility to test various engineering concepts. The experience of Balcke-Duerr is based on continuous research and development activities over the last 25 years and more than 350 executed projects for gas flow optimization applications. The success of these installations is a direct result of the key decisions based on the improved fluid mechanical design and proper system integration. This paper also identifies the sensible design particularities and solutions that have two be considered in the fluid mechanical design of high-dust SCR retrofit units. This article demonstrates that the layout of SCR units must be carefully reviewed in order to meet the performance requirements and to avoid problems, i.e. wear, catalyst plugging and ammonia slip. 9 refs., 18 figs.

  6. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  7. Distribution and Room Air Mixing Risks to Retrofitted Homes

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A. [IBACOS, Inc., Pittsburgh, PA (United States)

    2014-12-01

    Energy efficiency upgrades reduce heating and cooling loads on a house. With enough load reduction and if the HVAC system warrants replacement, the HVAC system is often upgraded with a more efficient, lower capacity system that meets the loads of the upgraded house. For a single-story house with ceiling supply air diffusers, ducts are often removed and upgraded. For houses with ducts that are embedded in walls, the cost of demolition precludes the replacement of ducts. The challenge with the use of existing ducts is that the reduced airflow creates a decreased throw at the supply registers, and the supply air and room air do not mix well, leading to potential thermal comfort complaints. This project investigates this retrofit scenario. The issues and solutions discussed here are relevant to all climate zones, with emphasis on climates that require cooling.

  8. Innovation in product and services in the shipping retrofit industry

    DEFF Research Database (Denmark)

    Hermann, Roberto Rivas; Köhler, Jonathan

    regulation could create innovation in green products and services in the maritime retrofitting industry?” Our case study focus on business models for the development, installation and operation of ballast water management systems in Denmark. We engaged the perspectives of ship-owners, equipment manufacturers....... Similarly, given the deindustrialisation dynamics to regions with lower manufacturing costs, it is argued that a combination of knowledge intensive and service-based economy will eventually fill the gap left by manufacturing industries. To create added value to their products, some leading firms...... are increasingly developing product-service systems. It is however, argued that product-service systems are not always sustainable, and thus little evidence connect them with green growth. To fill in this gap, we are carrying a case study guided by the following research question: “How the ballast water treatment...

  9. District heating and cooling systems for communities through power plant retrofit distribution network, Phase 2. Final report, 1 March 1980-31 January 1984. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-31

    This volume begins with an Introduction summarizing the history, methodology and scope of the study, the project team members and the private and public groups consulted in the course of the study. The Load and Service Area Assessment follows, including: a compilation and analysis of existing statistical thermal load data from census data, industrial directories, PSE and G records and other sources; an analysis of responses to a detailed, 4-page thermal load questionnaire; data on public buildings and fuel and energy use provided by the New Jersey Dept. of Energy; and results of other customer surveys conducted by PSE and G. A discussion of institutional questions follows. The general topic of rates is then discussed, including a draft hypothetical Tariff for Thermal Services. Financial considerations are discussed including a report identifying alternative ownership/financing options for district heating systems and the tax implications of these options. Four of these options were then selected by PSE and G and a financial (cash-flow) analysis done (by the PSE and G System Planning Dept.) in comparison with a conventional heating alternative. Year-by-year cost of heat ($/10/sup 6/ Btu) was calculated and tabulated, and the various options compared.

  10. Field Test Evaluation of Conservation Retrofits of Low-Income Single Family Buildings in Wisconsin: Summary Report; TOPICAL

    International Nuclear Information System (INIS)

    Ternes, M.P.

    2001-01-01

    During the winter of 1985-86, a retrofit field test was performed in 66 occupied, low-income, single-family homes in Madison, Wisconsin. The primary objectives of the field test were to (1) determine the measured energy savings and the relative benefits of a combination of envelope and mechanical equipment retrofits that were selected following a new audit-directed retrofit procedure, (2) determine the energy savings and benefits due to performing infiltration reduction work following a recently developed infiltration reduction procedure, and (3) study general occupant behavior and house thermal characteristics and their possible change following retrofit installation. This report provides an overview of the project and summarizes the findings which will be presented in detail in separate reports. Major findings from the field test include: (1) The audit-directed retrofit procedure produced an average savings of 207 therms/year/house. The procedure also more than doubled the overall cost-effectiveness of the low-income weatherization assistance program as compared with the priority system formerly used in Wisconsin. Wall insulation and condensing furnaces were the major retrofits (predicted annual energy savings greater than 100 therms/year) most often selected under the procedure. The respective average energy savings of the houses receiving wall insulation and condensing furnace. s was 14.6 and 14.3 therms/year for each$100 spent on them under the program. (2) The blower-door-guided infiltration reduction procedure reduced expenditures for infiltration reduction to about one-fourth of previous program costs (from$570/house to$106/house). The procedure also reduced the average air leakage rate in the treated houses by 16%, whereas, in a previous study, no significant reduction was found following the installation of typical infiltration reduction measures. (3) Twenty to 60% of the deviation between predicted and measured savings can be attributed to incorrect

  11. Solving the maintenance dilemma of ageing controls in nuclear standby generators. The decision to retro-fit the control system with 'off the shelf technology'

    International Nuclear Information System (INIS)

    Jackson, Neil; Rees, Christpher; Yeremain, Joseph

    2010-01-01

    Blackouts - Are we 2 Steps away from Nuclear meltdown owing to Aging Controls? The intent of this white paper is to high-light the need to:- 1. Replace the aging control systems associated with critical safety equipment of Standby Generators in the nuclear environment. 2. Explain how 'off the shelf' standard control equipment may be suitably selected, integrated and tested for a nuclear environment. 3. High-light the lessons learned in respect of: - a. Qualification of COTS (commercial off the shelf) equipment for use in a nuclear application. b. Software quality assurance program. c. Reducing plant outage time. 4. Guide you on the selection criteria of credible partners that can implement such mission critical control systems. Causes for Concern - The control systems of some of the Standby Generators are 30+ years old and aging equipment is no longer available from the OEM's. Maintenance crews are evolving with young engineers who have no experience, or chance to be trained, on the old installed control base. The writer has no doubt that the extent of the black outs of North America, Aug 2003, and the standby generators ever reducing availability, has compromised their ability to provide essential service and communications to maintain the safety of the nuclear plant. These concerns prompted Ontario Power Generator and Bruce Power to review the reliability of their standby generators and this review prompted them to locate a suitable supplier for the task of replacing the control system. OPG's previous attempts to have the controls replaced by I and C dedicated companies weighed heavy on their minds. Worsening the dilemma was the fact that it used dedicated controls and what might be considered 'Propriety Software'. Black Outs - Not only is it possible, the probability of it happening is getting stronger The Northeast Blackout of 2003 was a massive widespread power outage that occurred throughout parts of the North-eastern and Midwestern United States and Ontario

  12. Application and development of non contact angle-wide viewing system in vitreous retinal surgery

    Directory of Open Access Journals (Sweden)

    Rong-Hua He

    2016-07-01

    Full Text Available Wide-angle viewing system as an important auxiliary device can clearly observe the whole fundus field of vision in vitreous surgery, which enable vitreoretinal surgery more efficient, safer and more effective. So it has very high application value in ophthalmologic operation. In this paper, we studied the development and application of wide-angle viewing system in vitreoretinal surgery in recent years, from which we summed up the advantage of non-contact wide-angle viewing system in clinical field, and pointed out the shortcomings. The ultimate goal is to make the non-contact wide-angle viewing system better applied in vitreous surgery.

  13. Bay Ridge Gardens - Mixed-Humid Affordable Multifamily Housing Deep Energy Retrofit

    Energy Technology Data Exchange (ETDEWEB)

    Lyons, J.; Moore, M.; Thompson, M.

    2013-08-01

    Under this project, Newport Partners (as part of the BA-PIRC research team) evaluated the installation, measured performance, and cost-effectiveness of efficiency upgrade measures for a tenant-in-place DER at the Bay Ridge multifamily (MF) development in Annapolis, Maryland. The design and construction phase of the Bay Ridge project was completed in August 2012. This report summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete. The Bay Ridge project is comprised of a 'base scope' retrofit which was estimated to achieve a 30%+ savings (relative to pre-retrofit) on 186 apartments, and a 'DER scope' which was estimated to achieve 50% savings (relative to pre-retrofit) on a 12-unit building. The base scope was applied to the entire apartment complex, except for one 12-unit building which underwent the DER scope. A wide range of efficiency measures was applied to pursue this savings target for the DER building, including improvements/replacements of mechanical equipment and distribution systems, appliances, lighting and lighting controls, the building envelope, hot water conservation measures, and resident education. The results of this research build upon the current body of knowledge of multifamily retrofits. Towards this end, the research team has collected and generated data on the selection of measures, their estimated performance, their measured performance, and risk factors and their impact on potential measures.

  14. Data and analytics to inform energy retrofit of high performance buildings

    International Nuclear Information System (INIS)

    Hong, Tianzhen; Yang, Le; Hill, David; Feng, Wei

    2014-01-01

    Highlights: • High performance buildings can be retrofitted using measured data and analytics. • Data of energy use, systems operating and environmental conditions are needed. • An energy data model based on the ISO Standard 12655 is key for energy benchmarking. • Three types of analytics are used: energy profiling, benchmarking, and diagnostics. • The case study shows 20% of electricity can be saved by retrofit. - Abstract: Buildings consume more than one-third of the world’s primary energy. Reducing energy use in buildings with energy efficient technologies is feasible and also driven by energy policies such as energy benchmarking, disclosure, rating, and labeling in both the developed and developing countries. Current energy retrofits focus on the existing building stocks, especially older buildings, but the growing number of new high performance buildings built around the world raises a question that how these buildings perform and whether there are retrofit opportunities to further reduce their energy use. This is a new and unique problem for the building industry. Traditional energy audit or analysis methods are inadequate to look deep into the energy use of the high performance buildings. This study aims to tackle this problem with a new holistic approach powered by building performance data and analytics. First, three types of measured data are introduced, including the time series energy use, building systems operating conditions, and indoor and outdoor environmental parameters. An energy data model based on the ISO Standard 12655 is used to represent the energy use in buildings in a three-level hierarchy. Secondly, a suite of analytics were proposed to analyze energy use and to identify retrofit measures for high performance buildings. The data-driven analytics are based on monitored data at short time intervals, and cover three levels of analysis – energy profiling, benchmarking and diagnostics. Thirdly, the analytics were applied to a high

  15. A Steam Utility Network Model for the Evaluation of Heat Integration Retrofits – A Case Study of an Oil Refinery

    Directory of Open Access Journals (Sweden)

    Sofie Marton

    2017-12-01

    Full Text Available This paper presents a real industrial example in which the steam utility network of a refinery is modelled in order to evaluate potential Heat Integration retrofits proposed for the site. A refinery, typically, has flexibility to optimize the operating strategy for the steam system depending on the operation of the main processes. This paper presents a few examples of Heat Integration retrofit measures from a case study of a large oil refinery. In order to evaluate expected changes in fuel and electricity imports to the refinery after implementation of the proposed retrofits, a steam system model has been developed. The steam system model has been tested and validated with steady state data from three different operating scenarios and can be used to evaluate how changes to steam balances at different pressure levels would affect overall steam balances, generation of shaft power in turbines, and the consumption of fuel gas.

  16. Arkansas Solar Retrofit Guide. Greenhouses, Air Heaters and Water Heaters.

    Science.gov (United States)

    Skiles, Albert; Rose, Mary Jo

    Solar retrofits are devices of structures designed to be attached to existing buildings to augment their existing heating sources with solar energy. An investigation of how solar retrofits should be designed to suit the climate and resources of Arkansas is the subject of this report. Following an introduction (section 1), section 2 focuses on…

  17. Signal detectability of mammography depends on film-screen system and luminance of view box

    International Nuclear Information System (INIS)

    Maeda, Fumie; Ogura, Akio; Miyai, Akira

    2003-01-01

    High-density film and the high-luminance view-box system are being recommended for mammograms owing to the improved detection of masses. However, this system causes an increase in radiation. Therefore, the purpose of this study was to assess whether the detection of masses would improve using the normal-luminance view box and normal-density film with different types of contrast systems. Low-contrast detection using receiver operating characteristic (ROC) analysis and high-contrast detection using an American College of Radiology (ACR) phantom were evaluated for the following systems: high-density film and high-luminance view box, normal-density film and normal-luminance view box, and normal-density film with wide latitude and normal-luminance view box. The results showed no significant variation in the detectability of the system with high-density film and high-luminance view box and the normal-density film with wide latitude and normal-luminance view box. However, in terms of low-contrast visibility, the system using normal-density film and normal-luminance view box was significantly reduced in comparison with the others. Therefore, the system with normal-density film with wide latitude and the normal-luminance view box is recommended because of reduced radiation dose. (author)

  18. Concept development for the ITER equatorial port visible/infrared wide angle viewing system

    International Nuclear Information System (INIS)

    Reichle, R.; Beaumont, B.; Boilson, D.; Bouhamou, R.; Direz, M.-F.; Encheva, A.; Henderson, M.; Kazarian, F.; Lamalle, Ph.; Lisgo, S.; Mitteau, R.; Patel, K. M.; Pitcher, C. S.; Pitts, R. A.; Prakash, A.; Raffray, R.; Schunke, B.; Snipes, J.; Diaz, A. Suarez; Udintsev, V. S.

    2012-01-01

    The ITER equatorial port visible/infrared wide angle viewing system concept is developed from the measurement requirements. The proposed solution situates 4 viewing systems in the equatorial ports 3, 9, 12, and 17 with 4 views each (looking at the upper target, the inner divertor, and tangentially left and right). This gives sufficient coverage. The spatial resolution of the divertor system is 2 times higher than the other views. For compensation of vacuum-vessel movements, an optical hinge concept is proposed. Compactness and low neutron streaming is achieved by orienting port plug doglegs horizontally. Calibration methods, risks, and R and D topics are outlined.

  19. Crowne Plaza Renovation Retrofit Case Study

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-03-01

    InterContinental Hotels Group (IHG) and its franchise partner B.F. Saul Company Hospitality Group (B.F. Saul Co.) partnered with the Department of Energy (DOE) to develop and implement solutions to retrofit existing buildings to reduce energy consumption by at least 30% versus requirements set by Standard 90.1-2004 of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of North America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) Program.

  20. Measure Guideline. Hybrid Foundation Insulation Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K. [Building Science Corporation, Somerville, MA (United States); Lstiburek, J. [Building Science Corporation, Somerville, MA (United States)

    2012-05-01

    This measure guideline provides recommendations for designs and variations for retrofit hybrid assemblies in improving interior foundation insulation and water management of basements. Variations include closed cell spray foam (ccSPF) with membrane waterproofing or air gap membrane drainage layers, rigid board foam insulation at flat walls (cast concrete or CMU block), a “partial drainage” detail making use of the bulk water drainage that occurs through the field of a rubble stone wall, and non-drained spray foam assemblies (including slab insulation).

  1. Measure Guideline: Hybrid Foundation Insulation Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K.; Lstiburek, J.

    2012-05-01

    This measure guideline provides recommendations for designs and variations for retrofit hybrid assemblies in improving interior foundation insulation and water management of basements. Variations include closed cell spray foam (ccSPF) with membrane waterproofing or air gap membrane drainage layers, rigid board foam insulation at flat walls (cast concrete or CMU block), a 'partial drainage' detail making use of the bulk water drainage that occurs through the field of a rubble stone wall, and non-drained spray foam assemblies (including slab insulation).

  2. Retrofitting compressor engines to reduce emissions

    International Nuclear Information System (INIS)

    Collison, Melanie

    2011-01-01

    Cenovus Energy Inc. is upgrading its natural gas compression facilities at 37 sites it operates in Alberta. The project itself consists of a retrofit of the natural-fas fired engines that power the compressors that fill its natural gas sales pipe-line. Piping to capture fugitive natural gas will also be installed. These emissions will be used as fuel. The efficiency rating of such engine will be the same as a new fuel-injected engine. One of the challenge in the design of the parts of these engines ss to to ensure the least possible downtime to minimize production losses.

  3. Simple Retrofit High-Efficiency Natural Gas Water Heater Field Test

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, Ben [NorthernSTAR, St. Paul, MN (United States)

    2017-03-01

    High-performance water heaters are typically more time consuming and costly to install in retrofit applications, making high performance water heaters difficult to justify economically. However, recent advancements in high performance water heaters have targeted the retrofit market, simplifying installations and reducing costs. Four high efficiency natural gas water heaters designed specifically for retrofit applications were installed in single-family homes along with detailed monitoring systems to characterize their savings potential, their installed efficiencies, and their ability to meet household demands. The water heaters tested for this project were designed to improve the cost-effectiveness and increase market penetration of high efficiency water heaters in the residential retrofit market. The retrofit high efficiency water heaters achieved their goal of reducing costs, maintaining savings potential and installed efficiency of other high efficiency water heaters, and meeting the necessary capacity in order to improve cost-effectiveness. However, the improvements were not sufficient to achieve simple paybacks of less than ten years for the incremental cost compared to a minimum efficiency heater. Significant changes would be necessary to reduce the simple payback to six years or less. Annual energy savings in the range of $200 would also reduce paybacks to less than six years. These energy savings would require either significantly higher fuel costs (greater than $1.50 per therm) or very high usage (around 120 gallons per day). For current incremental costs, the water heater efficiency would need to be similar to that of a heat pump water heater to deliver a six year payback.

  4. Simple Retrofit High-Efficiency Natural Gas Water Heater Field Test

    Energy Technology Data Exchange (ETDEWEB)

    Schoenbauer, Ben [NorthernSTAR, St. Paul, MN (United States)

    2017-03-28

    High performance water heaters are typically more time consuming and costly to install in retrofit applications, making high performance water heaters difficult to justify economically. However, recent advancements in high performance water heaters have targeted the retrofit market, simplifying installations and reducing costs. Four high efficiency natural gas water heaters designed specifically for retrofit applications were installed in single-family homes along with detailed monitoring systems to characterize their savings potential, their installed efficiencies, and their ability to meet household demands. The water heaters tested for this project were designed to improve the cost-effectiveness and increase market penetration of high efficiency water heaters in the residential retrofit market. The retrofit high efficiency water heaters achieved their goal of reducing costs, maintaining savings potential and installed efficiency of other high efficiency water heaters, and meeting the necessary capacity in order to improve cost-effectiveness. However, the improvements were not sufficient to achieve simple paybacks of less than ten years for the incremental cost compared to a minimum efficiency heater. Significant changes would be necessary to reduce the simple payback to six years or less. Annual energy savings in the range of $200 would also reduce paybacks to less than six years. These energy savings would require either significantly higher fuel costs (greater than $1.50 per therm) or very high usage (around 120 gallons per day). For current incremental costs, the water heater efficiency would need to be similar to that of a heat pump water heater to deliver a six year payback.

  5. Seismic Behavior of Fatigue-Retrofitted Steel Frame Piers

    Directory of Open Access Journals (Sweden)

    Kinoshita K.

    2013-01-01

    Full Text Available Fatigue retrofit works have been conducted on severely fatigue damaged beam-to-column connections of existing steel frame bridge piers in Japan. It is clear that retrofit works provides additional stiffness but the significance on the seismic behavior of steel frame piers is not clear. Since fatigue retrofit works have become prevalent, the effect of fatigue retrofit works on the seismic behavior of steel frame piers need to be understood. The objective of this study is therefore to investigate these effects of the retrofit work, especially installation of bolted splices, which is the most common technique. Elasto-plastic finite element earthquake response analyses were carried out. It is shown that the existence of bolted splices may increase seismic demand on the piers when plastic hinge zone is located on the beam. In addition, longer bolted splices using low yield strength steel are proposed to overcome this problem and are shown to give beneficial effects.

  6. Indoor climate in renovated and energy retrofitted social housing

    DEFF Research Database (Denmark)

    Knudsen, Henrik Nellemose; Jensen, Ole Michael

    2016-01-01

    The need for energy retrofitting of the Danish single-family houses is massive, especially for the high proportion of single-family houses built in the 1960s and 1970s. But even though the potential benefits are many, only few families embark on a major energy retrofit. There may be many reasons...... for this. An obvious one may be limited knowledge of non-energy benefits, e.g. in relation to the indoor climate. The objective of this study was to explain this limited effort to save energy by identifying barriers and incentives among house owners in relation to energy retrofitting of one’s own house....... Moreover, it was investigated among house owners, who had carried out energy retrofitting, whether a number of factors, including the perceived indoor climate, became better or worse after retrofitting. A questionnaire survey was carried out among 1,990 house owners in a municipality north of Copenhagen...

  7. Energy retrofit analysis toolkits for commercial buildings: A review

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Hong, Tianzhen; Piette, Mary Ann; Taylor-Lange, Sarah C.

    2015-01-01

    Retrofit analysis toolkits can be used to optimize energy or cost savings from retrofit strategies, accelerating the adoption of ECMs (energy conservation measures) in buildings. This paper provides an up-to-date review of the features and capabilities of 18 energy retrofit toolkits, including ECMs and the calculation engines. The fidelity of the calculation techniques, a driving component of retrofit toolkits, were evaluated. An evaluation of the issues that hinder effective retrofit analysis in terms of accessibility, usability, data requirement, and the application of efficiency measures, provides valuable insights into advancing the field forward. Following this review the general concepts were determined: (1) toolkits developed primarily in the private sector use empirically data-driven methods or benchmarking to provide ease of use, (2) almost all of the toolkits which used EnergyPlus or DOE-2 were freely accessible, but suffered from complexity, longer data input and simulation run time, (3) in general, there appeared to be a fine line between having too much detail resulting in a long analysis time or too little detail which sacrificed modeling fidelity. These insights provide an opportunity to enhance the design and development of existing and new retrofit toolkits in the future. - Highlights: • Retrofit analysis toolkits can accelerate the adoption of energy efficiency measures. • A comprehensive review of 19 retrofit analysis toolkits was conducted. • Retrofit toolkits have diverse features, data requirement and computing methods. • Empirical data-driven, normative and detailed energy modeling methods are used. • Identified immediate areas for improvement for retrofit analysis toolkits

  8. Gas turbines for the rubber industry: Retrofit feasibility

    International Nuclear Information System (INIS)

    Demaria, F.; Pautasso, F.

    1992-01-01

    Cogeneration is becoming industry's choice to satisfy process requirements characterized by high energy demand and fairly steady thermal and electrical loads. This paper illustrated the suitability of cogeneration for the production of rubber and PVC floor tiles. The example studied here consists of a gas fuelled turboalternator set capable of producing 1,050 kW of electric power. The energy plant is equipped with a heat recovery system and a post-combustor for the production of a diathermic fluid used by the process equipment. The paper points out how engineers overcame the installation problems due to the presence of existing process equipment and the necessity for continuous plant operation during retrofitting. Attention is given to the energy and cost feasibility aspects of this intervention

  9. Converter Monitoring Unit for Retrofit of Wind Power Converters

    DEFF Research Database (Denmark)

    Rannestad, Bjorn; Maarbjerg, Anders Eggert; Frederiksen, Kristian

    2018-01-01

    A Converter Monitoring Unit (CMU), which will enable condition monitoring of wind turbine converters is presented in this paper. Reducing the cost of corrective maintenance by means of condition monitoring is a way of lowering Operation & Maintenance (O&M) costs for wind turbine systems....... The CMU must be able to detect a broad range of failure modes related to Insulated Gate Bipolar Transistor (IGBT) power modules and associated gate drives. IGBT collector-emitter on-state voltage (vceon) and current (ic) is sampled in the CMU and used for detection of emerging failures. A new method...... for compensation of unwanted inductive voltage drop in the vceon measurement path is presented, enabling retrofitting of CMUs in existing wind turbines. Finally, experimental results obtained on a prototype CMU are presented. Experimentally the vceon dependency to IGBT junction temperature and deterioration...

  10. Carrying the (paper) burden: A portfolio view of systemic risk and optimal bank size

    NARCIS (Netherlands)

    Bos, J.W.B.; Lamers, M.; Purice, V.

    2014-01-01

    We examine the relationship between bank size and financial stability by viewing the supervisor of a banking system as an ‘investor’ holding a portfolio of banks. Based on this view, we investigate the role of large banks in determining the systemic risk in this portfolio. Our results, based on book

  11. Implementation of an RHR/LPSI pump coupling retrofit program

    International Nuclear Information System (INIS)

    Dudiak, J.G.; Koch, R.P.; Orewyler, R.; Tipton, J.W.

    1994-01-01

    Nuclear plant operating experience has shown the RHR and LPSI services to be very demanding on pumps. The systems handle borated water at high temperatures and pressures with frequent step changes in both temperature and pressure. Additionally, the industry trend towards reduced flow rates during plant mid-loop (reduced inventory) conditions has resulted in extended pump operation at flow rates significantly below the pump best efficiency point flow. Operation at these low flow fates is known to cause high thrust loads and large shaft deflections. The combination of these and other factors have resulted in short mechanical seal life and short motor bearing life, thus requiring frequent pump and motor maintenance. For many nuclear plants, including Southern California Edison's (SCE) San Onofre Units 2 and 3, these pumps have represented a major operations and maintenance (O ampersand M) expenditure and a significant source of radiation exposure to plant personnel. SCE management determined that a pump upgrade was justified to reduce the O ampersand M costs and to improve plant availability. SCE decided to proceed with a pump retrofit program to improve the pump maintainability, reliability and availability. Installation was completed for four LPSI pumps at San Onofre Units 2 and 3 during the Cycle 7 refueling outages in 1993. A key to the program's success was the removal of many traditional supplier and customer barriers and revision of supplier and customer roles to create a unified team. This paper traces the RHR/LPSI retrofit program for San Onofre from problem identification to project implementation. The team approach used for this program and the lessons learned may be useful to other utilities and vendors when evaluating or implementing system and equipment upgrades

  12. Retrofitting Inefficient Rooftop Air-Conditioning Units Reduces U.S. Navy Energy Use (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-04-01

    As part of the U.S. Navy's overall energy strategy, the National Renewable Energy Laboratory (NREL) partnered with the Naval Facilities Engineering Command (NAVFAC) to demonstrate market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - retrofitting rooftop air-conditioning units with an advanced rooftop control system - was identified as a promising source for reducing energy use and costs, and can contribute to increasing energy security.

  13. A data library management system for midwest FreightView and its data repository.

    Science.gov (United States)

    2011-03-01

    Midwest FreightView (MWFV) and its associated data repository is part of a large multifaceted : effort to promote regional economic development throughout the Great Lakes : system. The main objective for the system is to promote sustainable maritime ...

  14. Skookum Jim Friendship Centre retrofit training

    Energy Technology Data Exchange (ETDEWEB)

    1984-08-01

    The retrofit/renovation of the Skookum Jim Friendship Centre in Whitehorse, Yukon, provided an ideal opportunity to train ten carpenters as specialists in energy conserving construction at the community level throughout the Yukon. Through this project, the trainees have gained special skills through hands-on experience with many energy conserving materials and techniques. As well, the training sessions provided extensive information on applicable thermodynamic principles and building science technology. The crew of two instructors, ten trainees, and the foreman covered all aspects of residential/light commercial construction which apply to retrofit work. Training sessions included information on site-safety, and interpreting the National Building Code, as well as special attention to the air tightness and insulation levels in the building. In observing the operation of the new building during the first heating season, it was noted that the heat provided by the lighting in the building supplied the majority of space heating requirements. Back-up electrical heating was required only at temperatures approaching design temperature for the building. 6 Figs.

  15. Simulating Performance Risk for Lighting Retrofit Decisions

    Directory of Open Access Journals (Sweden)

    Jia Hu

    2015-05-01

    Full Text Available In building retrofit projects, dynamic simulations are performed to simulate building performance. Uncertainty may negatively affect model calibration and predicted lighting energy savings, which increases the chance of default on performance-based contracts. Therefore, the aim of this paper is to develop a simulation-based method that can analyze lighting performance risk in lighting retrofit decisions. The model uses a surrogate model, which is constructed by adaptively selecting sample points and generating approximation surfaces with fast computing time. The surrogate model is a replacement of the computation intensive process. A statistical method is developed to generate extreme weather profile based on the 20-year historical weather data. A stochastic occupancy model was created using actual occupancy data to generate realistic occupancy patterns. Energy usage of lighting, and heating, ventilation, and air conditioning (HVAC is simulated using EnergyPlus. The method can evaluate the influence of different risk factors (e.g., variation of luminaire input wattage, varying weather conditions on lighting and HVAC energy consumption and lighting electricity demand. Probability distributions are generated to quantify the risk values. A case study was conducted to demonstrate and validate the methods. The surrogate model is a good solution for quantifying the risk factors and probability distribution of the building performance.

  16. Retrofitting refinery and petrochemical plants

    Energy Technology Data Exchange (ETDEWEB)

    Kesler, M.G.

    1988-06-01

    This article focuses on process improvements as the best way to reduce plant energy use. The emphasis on process revamp is well justified, as an energy profile for a typical refinery shows. The diagram shows that 60% of the total heat losses are in water and air cooling. Most of this heat loss results from condensing and cooling in fractionators and recycle systems, intermediate product cooling, and condensing of turbine steam. These losses, of mostly low-level heat, are tied to the basic approach previously used for the process design of existing refineries. Despite the progress to date, there is growing evidence that these heat losses can be further reduced economically by about 20-30% in most refineries and petrochemical plants. One way to reduce the losses is to increase recovery of low-level heat by improved heat exchange, which has been the subject of most publications on plant energy conservation. A better way, presented here, is to develop new process schemes that require less air/water cooling. One useful concept in developing new schemes is to concentrate on heat losses, rather than heat input, as an easier measure of proposed improvements. By an overall heat balance, eliminating a unit of energy loss is equivalent to saving a unit of heat input somewhere in the plant.

  17. Energy retrofit of commercial buildings. Case study and applied methodology

    Energy Technology Data Exchange (ETDEWEB)

    Aste, N.; Del Pero, C. [Department of Building Environment Science and Technology (BEST), Politecnico di Milano, Via Bonardi 3, 20133 Milan (Italy)

    2013-05-15

    Commercial buildings are responsible for a significant share of the energy requirements of European Union countries. Related consumptions due to heating, cooling, and lighting appear, in most cases, very high and expensive. Since the real estate is renewed with a very small percentage each year and current trends suggest reusing the old structures, strategies for improving energy efficiency and sustainability should focus not only on new buildings, but also and especially on existing ones. Architectural renovation of existing buildings could provide an opportunity to enhance their energy efficiency, by working on the improvement of envelopes and energy supply systems. It has also to be noted that the measures aimed to improve the energy performance of buildings should pay particular attention to the cost-effectiveness of the interventions. In general, there is a lack of well-established methods for retrofitting, but if a case study achieves effective results, the adopted strategies and methodologies can be successfully replicated for similar kinds of buildings. In this paper, an iterative methodology for energy retrofit of commercial buildings is presented, together with a specific application on an existing office building. The case study is particularly significant as it is placed in an urban climatic context characterized by cold winters and hot summers; consequently, HVAC energy consumption is considerable throughout the year. The analysis and simulations of energy performance before and after the intervention, along with measured data on real energy performance, demonstrate the validity of the applied approach. The specifically developed design and refurbishment methodology, presented in this work, could be also assumed as a reference in similar operations.

  18. Efficiency and cost effectiveness of retrofitting ventilation in low-rise housing

    International Nuclear Information System (INIS)

    Bowser, D.; Fugler, D.

    2000-01-01

    Effective and inexpensive ventilation systems that can be retrofitted to existing low-rise housing to improve indoor air quality in existing housing stock is discussed. In a project by CMHC ten retrofit ventilation systems in single family residential buildings were tested in an effort to identify homes with specific indoor air quality concerns and to evaluate the performance of these retrofit systems by monitoring air quality before and after installation. Measurements were taken over a two-to-three day period with normal occupancy. In one case radon contamination was also measured directly before and after the retrofit. Cost estimates were based on capital, operating and maintenance expenses. This paper describes the results of three sample case studies. One of these involved a home with high concentration of radon gas. The recommended solution was fan-assisted removal of soil gases as the only way to ensure substantial reductions in concentration. Cost of the system was $2,450, plus $79 annual operating expenses. The second case involved a basement apartment with odour and moisture build-up. To solve the problem, an exhaust-only ventilation system with multiple pick-up points was installed at a cost of $750. Annual operating costs are estimated at $171. The third case study described a dwelling with windows and exhaust ducts showing condensation and mold on the bathroom ceiling. Balanced mechanical ventilation via an HRV was installed to exhaust the moist air from the house and to supply fresh dry air. In this case cost of the system was $1,345 installed, plus annual operating costs of $117. It was stressed that different houses have different requirements. Therefore it is important to be fully aware of the amount of natural ventilation a house has, prior to determining whether the solution demands additional ventilation requirements or simply redistribution. 1 ref., 3 figs

  19. Diagnostics for a coal-fired MHD retrofit of an existing power station

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R L; Shepard, W S [Mississippi State Univ. (USA). Diagnostic Instrumentation and Analysis Lab.

    1990-01-01

    MHD flows represent one of the most severe environments encountered by gasdynamic diagnostics. Special state-of-the-art techniques and instrumentation systems are required to monitor and collect data for the MHD components, and these diagnostic systems must operate under very severe environmental and magnetic field conditions. The Diagnostic Instrumentation and Analysis Laboratory (DIAL) at Mississippi State University has developed, and is continuing to develop, advanced optical diagnostic techniques and instrumentation systems to provide nonintrusive, remote real-time measurements and to operate successfully in the industrial-like environment of a large-scale MHD retrofit power station. Such diagnostic instrumentation can provide the information to completely evaluate the performance of individual components, as well as, the entire power plant. It is essential to determine as much detail as possible about the various component operations in an MHD retrofit system so that a commercial plant design can be optimized quickly. This paper discusses the instrumentation systems which DIAL proposed for an MHD retrofit of an existing power station. Instruments which have been making measurements on the U.S. MHD test facilities for several years are presented, along with instruments which will be available within two years. Parameters to be measured along with location and frequency are discussed in detail. These parameters include electron density, electrical conductivity, K-atom density, gas temperature, gas velocity, temperature and velocity profiles, gas composition, and particle size, number, density and distrib00000

  20. Commercial Building Energy Saver: An energy retrofit analysis toolkit

    International Nuclear Information System (INIS)

    Hong, Tianzhen; Piette, Mary Ann; Chen, Yixing; Lee, Sang Hoon; Taylor-Lange, Sarah C.; Zhang, Rongpeng; Sun, Kaiyu; Price, Phillip

    2015-01-01

    Highlights: • Commercial Building Energy Saver is a powerful toolkit for energy retrofit analysis. • CBES provides benchmarking, load shape analysis, and model-based retrofit assessment. • CBES covers 7 building types, 6 vintages, 16 climates, and 100 energy measures. • CBES includes a web app, API, and a database of energy efficiency performance. • CBES API can be extended and integrated with third party energy software tools. - Abstract: Small commercial buildings in the United States consume 47% of the total primary energy of the buildings sector. Retrofitting small and medium commercial buildings poses a huge challenge for owners because they usually lack the expertise and resources to identify and evaluate cost-effective energy retrofit strategies. This paper presents the Commercial Building Energy Saver (CBES), an energy retrofit analysis toolkit, which calculates the energy use of a building, identifies and evaluates retrofit measures in terms of energy savings, energy cost savings and payback. The CBES Toolkit includes a web app (APP) for end users and the CBES Application Programming Interface (API) for integrating CBES with other energy software tools. The toolkit provides a rich set of features including: (1) Energy Benchmarking providing an Energy Star score, (2) Load Shape Analysis to identify potential building operation improvements, (3) Preliminary Retrofit Analysis which uses a custom developed pre-simulated database and, (4) Detailed Retrofit Analysis which utilizes real-time EnergyPlus simulations. CBES includes 100 configurable energy conservation measures (ECMs) that encompass IAQ, technical performance and cost data, for assessing 7 different prototype buildings in 16 climate zones in California and 6 vintages. A case study of a small office building demonstrates the use of the toolkit for retrofit analysis. The development of CBES provides a new contribution to the field by providing a straightforward and uncomplicated decision

  1. Measure Guideline: Deep Energy Enclosure Retrofit for Interior Insulation of Masonry Walls

    Energy Technology Data Exchange (ETDEWEB)

    Musunuru, S. [Building Science Corporation, Westford, MA (United States); Pettit, B. [Building Science Corporation, Westford, MA (United States)

    2015-04-01

    This Measure Guideline describes a deep energy enclosure retrofit (DEER) solution for insulating mass masonry buildings from the interior. It describes the retrofit assembly, technical details, and installation sequence for retrofitting masonry walls. Interior insulation of masonry retrofits has the potential to adversely affect the durability of the wall; this document includes a review of decision criteria pertinent to retrofitting masonry walls from the interior and the possible risk of freeze-thaw damage.

  2. Measure Guideline. Deep Energy Enclosure Retrofit for Interior Insulation of Masonry Walls

    Energy Technology Data Exchange (ETDEWEB)

    Musunuru, S. [Building Science Corporation, Westford, MA (United States); Pettit, B. [Building Science Corporation, Westford, MA (United States)

    2015-04-30

    This Measure Guideline describes a deep energy enclosure retrofit solution for insulating mass masonry buildings from the interior. It describes the retrofit assembly, technical details, and installation sequence for retrofitting masonry walls. Interior insulation of masonry retrofits might adversely affect the durability of the wall. This guideline includes a review of decision criteria pertinent to retrofitting masonry walls from the interior and the possible risk of freeze-thaw damage.

  3. Walmart - Saving Energy, Saving Money Through Comprehensive Retrofits, Commercial Building Energy Efficiency (Fact Sheet); Energy Efficiency & Renewable Energy (EERE)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    Walmart partnered with the U.S. Department of Energy (DOE) in 2009 to develop and demonstrate energy retrofits for existing buildings. The goal was to reduce energy consumption by at least 30% versus ASHRAE Standard 90.1-2007, as part of DOE's Commercial Building Partnerships (CBP) Program. The project presented here, the retrofit of a 213,000 square foot store in Centennial, Colorado, withefficiency measures across multiple building systems, is part of Walmart's ongoing environmental sustainability program, which originated in 2005.

  4. Retrofit design of remotely removable decontamination spray nozzles for the new waste calcining facility at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Gay, J.A.

    1988-01-01

    High level radioactive liquid waste is converted to a solid form at the Idaho Chemical Processing Plant (ICPP). The conversion is done by a fluidized bed combustion process in the calciner vessel. The interior decontamination system for the calciner vessel uses a common header bolted to four decontamination nozzles around the upper head. The retrofit was required to eliminate hands-on maintenance and difficulty in nozzle removal because of nozzle plugging. The retrofit design for this project demonstrates the solution of problems associated with thermal phenomena, structural supports, seismic requirements, remote handling and installations into extremely restricted spaces

  5. Nuclear power plants electrical retrofitting for cost effectiveness, reliability and operating efficiency

    International Nuclear Information System (INIS)

    Ciufu, L.; Popescu, M. O.

    2016-01-01

    In the context of continuous fast growing of the energy demand the current power plants retrofitting concept may represent an important step in the emission reduction, being able to offer in the same time a maximum operating efficiency. This desideratum can be obtained by implementing a rigorous energy management plan, based on an increased energy production capacity of non-pollutant electrical power plants and future-oriented frame on extending their lifetime operation. This management is focused on using state-of-art electronic, electrical and industrial control equipments, which can represent a real key factor. Thus, in this paper an analysis of the electrical system retrofitting is presented. As a part of this research the authors propose and simulate ambitious ways to upgrade actual control and command of the electrical operating systems, by promoting variable speed for large pumps and also computer software, as SCADA, for an intelligent control and monitoring of these studied processes. (authors)

  6. Cold Climate Foundation Retrofit Experimental Hygrothermal Performance. Cloquet Residential Research Facility Laboratory Results

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, Louise F. [NorthernSTAR, St. Paul, MN (United States); Harmon, Anna C. [NorthernSTAR, St. Paul, MN (United States)

    2015-04-09

    This project was funded jointly by the National Renewable Energy Laboratory (NREL) and Oak Ridge National Laboratory (ORNL). ORNL focused on developing a full basement wall system experimental database to enable others to validate hygrothermal simulation codes. NREL focused on testing the moisture durability of practical basement wall interior insulation retrofit solutions for cold climates. The project has produced a physically credible and reliable long-term hygrothermal performance database for retrofit foundation wall insulation systems in zone 6 and 7 climates that are fully compliant with the performance criteria in the 2009 Minnesota Energy Code. These data currently span the period from November 10, 2012 through May 31, 2014 and are anticipated to be extended through November 2014. The experimental data were configured into a standard format that can be published online and that is compatible with standard commercially available spreadsheet and database software.

  7. Cancer Theory from Systems Biology Point of View

    Science.gov (United States)

    Wang, Gaowei; Tang, Ying; Yuan, Ruoshi; Ao, Ping

    In our previous work, we have proposed a novel cancer theory, endogenous network theory, to understand mechanism underlying cancer genesis and development. Recently, we apply this theory to hepatocellular carcinoma (HCC). A core endogenous network of hepatocyte was established by integrating the current understanding of hepatocyte at molecular level. Quantitative description of the endogenous network consisted of a set of stochastic differential equations which could generate many local attractors with obvious or non-obvious biological functions. By comparing with clinical observation and experimental data, the results showed that two robust attractors from the model reproduced the main known features of normal hepatocyte and cancerous hepatocyte respectively at both modular and molecular level. In light of our theory, the genesis and progression of cancer is viewed as transition from normal attractor to HCC attractor. A set of new insights on understanding cancer genesis and progression, and on strategies for cancer prevention, cure, and care were provided.

  8. Efficiency of blue-green stormwater retrofits for flood mitigation - Conclusions drawn from a case study in Malmö, Sweden.

    Science.gov (United States)

    Haghighatafshar, Salar; Nordlöf, Beatrice; Roldin, Maria; Gustafsson, Lars-Göran; la Cour Jansen, Jes; Jönsson, Karin

    2018-02-01

    Coupled one-dimensional (1D) sewer and two-dimensional (2D) overland flow hydrodynamic models were constructed to evaluate the flood mitigation efficiency of a renowned blue-green stormwater retrofit, i.e. Augustenborg, in Malmö, Sweden. Simulation results showed that the blue-green stormwater systems were effective in controlling local surface flooding in inner-city catchments, having reduced the total flooded surfaces by about 70%. However, basement flooding could still be a potential problem depending on the magnitude of the inflows through combined sewer from upstream areas. Moreover, interactions between blue-green retrofits and the surrounding pipe-system were studied. It was observed that the blue-green retrofits reduced the peak flows by approximately 80% and levelled out the runoff. This is a substantial advantage for downstream pipe-bound catchments, as they do not receive a cloudburst-equivalent runoff from the retrofitted catchment, but a reduced flow corresponding to a much milder rainfall. Blue-green retrofits are more effective if primarily implemented in the upstream areas of a pipe-bound catchment since the resulting reduced runoff and levelled out discharge would benefit the entire network lying downstream. Implementing blue-green retrofits from upstream towards downstream can be considered as a sustainable approach. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. A View on Future Building System Modeling and Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Wetter, Michael

    2011-04-01

    This chapter presents what a future environment for building system modeling and simulation may look like. As buildings continue to require increased performance and better comfort, their energy and control systems are becoming more integrated and complex. We therefore focus in this chapter on the modeling, simulation and analysis of building energy and control systems. Such systems can be classified as heterogeneous systems because they involve multiple domains, such as thermodynamics, fluid dynamics, heat and mass transfer, electrical systems, control systems and communication systems. Also, they typically involve multiple temporal and spatial scales, and their evolution can be described by coupled differential equations, discrete equations and events. Modeling and simulating such systems requires a higher level of abstraction and modularisation to manage the increased complexity compared to what is used in today's building simulation programs. Therefore, the trend towards more integrated building systems is likely to be a driving force for changing the status quo of today's building simulation programs. Thischapter discusses evolving modeling requirements and outlines a path toward a future environment for modeling and simulation of heterogeneous building systems.A range of topics that would require many additional pages of discussion has been omitted. Examples include computational fluid dynamics for air and particle flow in and around buildings, people movement, daylight simulation, uncertainty propagation and optimisation methods for building design and controls. For different discussions and perspectives on the future of building modeling and simulation, we refer to Sahlin (2000), Augenbroe (2001) and Malkawi and Augenbroe (2004).

  10. Applicability and economic efficiency of earthquake retrofit measures on existing buildings in Bucharest, Romania

    Science.gov (United States)

    Bostenaru, M.

    2009-04-01

    The research discussed in this contribution contains two aspects: on one side the economic efficiency of seismic retrofit measures, and on the other their applicability. The research was limited to housing buildings. Bucharest, the capital of Romania, was the object of the research. Strong earthquakes affect Bucharest about three times in a century, the damaging earthquakes of the 20th century being in 1940 and 1977. Other strong earthquakes occurred in 1986 and 1990. Since it is a broad topic, first the building type was determined, which should serve further research. For this scope the building types of the 20th century, which are common in Bucharest, Romania, were investigated. For each building type reports have been written, which comprised the earthquake resilient features, the seismic defficiencies, the damage patterns and the retrofit measures. Each of these features was listed for elements of the building. A first result of the research was an integrated system in order to include latter aspects in the planning in the first steps. So already at the building survey attention has to be paid on how a building is subdivided in order to be able to determine the economic efficiency of the planned action. So were defined the `retrofit elements`. In a first step the characteristics were defined, through which these retrofit elements (for example column, wall part between two windows) can be recognised in the building survey. In a further one, which retrofit measures can be connected to these. Diagrams were built, in order to visualise these findings. For each retrofit element and the corresponding measure the costs were calculated. Also, these retrofit elements and the measures connected to them were modelled for the simulation with the structural software, so that the benefit of the measures could be determined. In the part which regarded the economic efficiency, benefits and costs of retrofit measures had to be compared, so the improvement in the rigidity

  11. Design of LabVIEW based test system software for MDC electronics

    International Nuclear Information System (INIS)

    Xue Lin; Huazhong Normal Univ., Wuhan; Huang Guangming; Zhang Hongyu; Jiang Xiaoshan; Sheng Huayi; Zhuang Baoan

    2006-01-01

    This paper presents the design of Test System Software for MDC Electronics. The highly modular software, developed in LabVIEW and VC ++ 6.0, has been applied in hardware debugging and performance test. LabVIEW and its DLL calling mechanism are introduced briefly. Testing functions of the software, as well as its user interfaces, are described in detail. (authors)

  12. A top-down approach to construct execution views of a large software-intensive system

    NARCIS (Netherlands)

    Callo Arias, Trosky B.; America, Pierre; Avgeriou, Paris

    This paper presents an approach to construct execution views, which are views that describe what the software of a software-intensive system does at runtime and how it does it. The approach represents an architecture reconstruction solution based on a metamodel, a set of viewpoints, and a dynamic

  13. Safety margins and retrofit. The technical calculation perspective; Sicherheitsmargen durch Nachruestung aus Sicht der technischen Berechnung

    Energy Technology Data Exchange (ETDEWEB)

    Daichendt, Matthias [Kraftanlagen Heidelberg GmbH, Heidelberg (Germany). Systemtechnik - Technische Berechnungen

    2016-01-15

    Safety margins are an essential factor of the safety philosophy for nuclear power plants. They support to cover future requirements even today. The basic safety concept is one key topic as also aspects of process engineering, the dimensioning and mechanical analysis of systems and ageing management. Calculations with today's capabilities are an integral part of the determination of safety margins. They can be used to analyse and to assess retrofit measures.

  14. SEISMICALLY RETROFITTING AND UPGRADING RC-MRF BY USING EXPANDED METAL PANELS

    OpenAIRE

    Phung Ngoc, Dung

    2011-01-01

    Reinforced concrete moment resisting frames (RC-MRFs) have been widely used as the main structural resisting systems for over 30 years based on their capacity in resisting both gravity loads and lateral forces like winds or earthquakes and on low cost of construction. However, there have been still many existing RC-MRFs not designed according to any modern seismic code. This may lead to some undesired failures under a rather low intensity earthquake. There are several existing retrofitting sy...

  15. A contemporary view of systems engineering. [definition of system and discussion of systems approach

    Science.gov (United States)

    Miles, R. F., Jr.

    1974-01-01

    The concept of a 'system' is defined, and the 'systems approach' is discussed. Four contemporary examples of the systems approach are presented: an operations research project, the planning-programming-budgeting system, an information processing system, and aerospace programs.

  16. Solving the maintenance dilemma of ageing controls in nuclear standby generators. The decision to retro-fit the control system with 'off the shelf technology'

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Neil [Turbine Controls Ltd Canada, 5288 General Rd, L4W 1Z8 Mississauga (Canada); Rees, Christpher [Turbine Controls Ltd UK, 52 Kenilworth Drive, LE2 5LG Leicester (United Kingdom); Yeremain, Joseph [Thermodyne, 421 Nugget Avenue Unit 3, Toronto Ontario M1S 4L8 (Canada)

    2010-07-01

    solar storm has happened before in 1859, and again in 1959. Over time, the electrical grid has become more efficient, making it more vulnerable to sol ar storms. According to the NASA report, a severe space weather event in the U.S. could induce ground currents that would knock out 300 key transformers within about 90 seconds, cutting off power to more than 130 million people. It would also probably take out global communications systems. Rebuilding the grid after such an event would take about 4 to 10 years, according to FEMA and NOAA. Ask yourself, What if any of the above happened to your nuclear plant? What is the possibility of future blackouts and herein lays the first dilemma.. Standby Generators are the safety devices for Nuclear Power Plants. they have to run and not just for a few hours. Nuclear Plant life support Standby Generators are put through rigorous daily maintenance. The very nature of the I and C checks cause wear and tear on the control components, termination and sensors, thereby inducing the likelihood of failure to start.. Six of the Ontario Power Generating (Pickering) and Eight of the Bruce Power (Tiverton) systems have been retrofitted with TCL Posiflow, PLC control and new instrumentation systems. How was this done - The white paper explains. (authors)

  17. Amelioration and retrofitting of educational buildings

    Science.gov (United States)

    Casciati, Fabio; Casciati, Sara

    2018-01-01

    Following a seismic event that occurred years ago in Central Italy, the public opinion was growing and growing a concern on the adequacy of educational buildings all across Italy. This activated several political decisions and a consequent technical effort is in progress. Technically speaking one has to manage the classical problem of retrofitting existing buildings. However, the legal environment goes across national codes, targeted guidelines and the professional need of achieving pragmatic solutions based on ethical and social acceptation schemes.This paper introduces the topic in its worldwide exception and focuses then on some operative aspects in the Italian situation. It outlines the consolidated steps along this technical process and emphasizes the weak aspects one meets when going across the designers' reports.

  18. Retrofit of containers in civil construction

    Directory of Open Access Journals (Sweden)

    Leonora Romano

    2014-02-01

    Full Text Available The solid waste reuse affects all society sectors that have committed to generate the smallest possible impact in the environment. Professionals in the construction industry, from which comes an important part of solid waste, rethink their project decisions about the use of conventional materials, evaluating on a case-by-case costs and benefits of their choices. The recycling or reuse of solid waste in building became a reality and their prudent use a necessity, a fact that enhances the role of academic research involving the subject (Carneiro; CASSA ; BRUM , 2001. Among the materials investigated thoroughly is the container, discard material that can become a problem for the public space and nature, but that is slowly gaining market share due to advantages associated with cost , speed of assembly , durability and reuse residue, or retrofit , which substantially decreases (dis advantages that this type of architecture might suggest, many of them conditioned to merely esthetic analysis (ZOMER , 2009.

  19. Retrofitting reciprocating compressors for noise control

    International Nuclear Information System (INIS)

    Frank, L.; Qualfe, R.

    1992-01-01

    The Alberta Energy Resources Conservation Board recently enacted their noise control directive ID 88-1. The effects of this regulation on the operation of an oil and gas facility are discussed, and a specific case history is presented to provide a disciplined strategy for noise attenuation retrofits. An investigation was carried out into sound sources at a reciprocating compressor gas plant, revealing several sound sources: engine exhaust stacks, engine exhaust silencer shells, direct-drive fan cooler inlets, direct drive fan cooler outlets, aerial cooler inlets and aerial cooler outlets. Details are presented of the investigative techniques and order-ranking of sources by decibel level. When controlling engine exhaust noise, silencers or mufflers are the preferred treatment. Choice of type (reactive or absorptive) and specification of acoustical performance of a silencer are discussed. The gas plant achieved noise reductions of 6-13 dB, measured at affected residences, through the use of engine exhaust silencers. 4 figs., 2 tabs

  20. Retrofitting the Southeast. The Cool Energy House

    Energy Technology Data Exchange (ETDEWEB)

    Zoeller, W. [Steven Winter Associates, Inc., Norwalk, CT (United States); Shapiro, C. [Steven Winter Associates, Inc., Norwalk, CT (United States); Vijayakumar, G. [Steven Winter Associates, Inc., Norwalk, CT (United States); Puttagunta, S. [Steven Winter Associates, Inc., Norwalk, CT (United States)

    2013-02-01

    The Consortium for Advanced Residential Buildings research team has provided the technical engineering and building science support for a highly visible demonstration home that was unveiled at the National Association of Home Builders' International Builders Show on Feb. 9, 2012, in Orlando, FL. The two previous projects, the Las Vegas net-zero ReVISION House and the 2011 VISION and ReVISION Houses in Orlando, met goals for energy efficiency, cost effectiveness, and information dissemination through multiple web-based venues. This report describes the deep energy retrofit of the Cool Energy House (CEH), which began as a mid-1990s two-story traditional specification house of about 4,000 ft2 in the upscale Orlando suburb of Windermere.

  1. Retrofitting the Southeast: The Cool Energy House

    Energy Technology Data Exchange (ETDEWEB)

    Zoeller, W.; Shapiro, C.; Vijayakumar, G.; Puttagunta, S.

    2013-02-01

    The Consortium for Advanced Residential Buildings has provided the technical engineering and building science support for a highly visible demonstration home in connection with the National Association of Home Builders' International Builders Show. The two previous projects, the Las Vegas net-zero ReVISION House and the 2011 VISION and ReVISION Houses in Orlando, met goals for energy efficiency, cost effectiveness, and information dissemination through multiple web-based venues. This project, which was unveiled at the 2012 International Builders Show in Orlando on February 9, is the deep energy retrofit Cool Energy House (CEH). The CEH began as a mid-1990s two-story traditional specification house of about 4,000 ft2 in the upscale Orlando suburb of Windermere.

  2. System Views on Entrepreneurship – Going in the Right Direction?

    DEFF Research Database (Denmark)

    Christensen, Jesper Lindgaard

    2016-01-01

    The literature on National Systems of Entrepreneurship (NSE) (Acs et al., 2014, 2016) has been claimed to be an important strand of entrepreneurship literature. This paper takes stock of system perspectives on entrepreneurship including recent re-vitalizations of the concept. Based on literature ...

  3. A global "imaging'' view on systems approaches in immunology.

    Science.gov (United States)

    Ludewig, Burkhard; Stein, Jens V; Sharpe, James; Cervantes-Barragan, Luisa; Thiel, Volker; Bocharov, Gennady

    2012-12-01

    The immune system exhibits an enormous complexity. High throughput methods such as the "-omic'' technologies generate vast amounts of data that facilitate dissection of immunological processes at ever finer resolution. Using high-resolution data-driven systems analysis, causal relationships between complex molecular processes and particular immunological phenotypes can be constructed. However, processes in tissues, organs, and the organism itself (so-called higher level processes) also control and regulate the molecular (lower level) processes. Reverse systems engineering approaches, which focus on the examination of the structure, dynamics and control of the immune system, can help to understand the construction principles of the immune system. Such integrative mechanistic models can properly describe, explain, and predict the behavior of the immune system in health and disease by combining both higher and lower level processes. Moving from molecular and cellular levels to a multiscale systems understanding requires the development of methodologies that integrate data from different biological levels into multiscale mechanistic models. In particular, 3D imaging techniques and 4D modeling of the spatiotemporal dynamics of immune processes within lymphoid tissues are central for such integrative approaches. Both dynamic and global organ imaging technologies will be instrumental in facilitating comprehensive multiscale systems immunology analyses as discussed in this review. © 2012 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  4. A Teacher's Retrospective View of the Syrian Educational System

    Science.gov (United States)

    Zarad, Rami Abu

    2014-01-01

    This is a descriptive, as much as an interpretive, article about the Syrian educational system and the first-hand experience of an EFL (English as a Foreign Language) practitioner describing the system from within, as much as from without. "From within" because it is based on observations derived from his own teaching experience at a…

  5. New technologies for an effective energy retrofit of hospitals

    International Nuclear Information System (INIS)

    Bizzarri, Giacomo; Morini, Gian Luca

    2006-01-01

    Following the approval by the European Parliament of the directive on energy efficiency of public buildings, a great effort has been directed towards enhancing low-emission systems such as fuel cells (FC), photovoltaic systems (PVS) or solar thermal systems (STS), especially in all public facilities, such as hospitals, characterized by relevant energy requirements. This paper develops a theoretical analysis which focuses on the environmental benefits achievable through a shift from the conventional systems, normally operating in hospitals, to various hybrid plants. The model site is a hospital located near Ferrara (Italy). Several hybrid schemes were investigated and compared: PAFCs (phosporic acid fuel cells), STS and PVS. An energy analysis was developed for each option assuming, as a benchmark, the conventional systems operating today in the medical center. The results, presented with reference to the primary energy requirements and the pollutant emissions, demonstrate that in the case of existing systems being upgraded with these hybrid plants, overall emissions could be abated with a significant reduction in fossil energy consumption. Finally, an economic study, even taking external factors into account, is developed for all the retrofit scenarios in terms of annual return, simple payback period and IRR

  6. The control and data acquisition system of a laser in-vessel viewing system

    International Nuclear Information System (INIS)

    Pereira, Rita C.; Cruz, Nuno; Neri, C.; Riva, M.; Correia, C.; Varandas, C.A.F.

    2000-01-01

    This paper presents the dedicated control and data acquisition system (CADAS) of a new laser in-vessel viewing system that has been developed for inspection purposes in fusion experiments. CADAS is based on a MC68060 microprocessor and on-site developed VME instrumentation. Its main aims are to simultaneously control the laser alignment system as well as the laser beam deflection for in-vessel scanning, acquire a high-resolution image and support real-time data flow rates up to 2 Mbyte/s from the acquisition modules to the hard disk and network. The hardware (modules for control and alignment acquisition, scanning acquisition and monitoring) as well as the three levels of software are described

  7. Technology line and case analysis of heat metering and energy efficiency retrofit of existing residential buildings in Northern heating areas of China

    International Nuclear Information System (INIS)

    Zhao Jing; Zhu Neng; Wu Yong

    2009-01-01

    The building area in northern heating areas accounting for 70% of the total land area in China is 6,500,000,000 m 2 . The average heating energy consumption in northern China is 100-200% times more than developed countries in the same latitude. This paper introduced firstly the heat metering and energy efficiency retrofit background of existing residential buildings in northern heating areas of China organized by mohurd and MOF, and then put forward the total principle and contents of retrofit. Through analyzing some retrofit cases in Germany, Poland and China, some technological experiences were summarized and finally a technology line suitable for heat metering and energy efficiency retrofit of existing residential buildings in northern heating areas of China which involved retrofit for heat metering and temperature regulation of heating systems, heat balance of heat source and network, and building envelope was described to provide a systematic, scientific, technological guide for the retrofit projects of 0.15 billion m 2 in 'the Eleventh Five-Year Plan' period.

  8. A spreadsheet-based microcomputer application for determining cost-effectiveness of commercial lighting retrofit opportunities

    International Nuclear Information System (INIS)

    Spain, T.K.

    1992-01-01

    Lighting accounts for 20-25% of electricity use in the United States. With estimates of 50-70% potential reductions being made by energy engineers, lighting is a promising area for cost-effective energy conservation projects in commercial buildings. With an extensive array of alternatives available to replace or modify existing lighting systems, simple but effective calculation tools are needed to help energy auditors evaluate lighting retrofits. This paper describes a spreadsheet-based microcomputer application for determining the cost-effectiveness of commercial lighting retrofits. Developed to support walk-through energy audits conducted by the Industrial Energy Advisory Service (IdEAS), the spreadsheet provides essential comparative data for evaluating the payback of alternatives. The impact of alternatives on environmental emissions is calculated to help communicate external costs and sell the project, if appropriate. The methodology and calculations are fully documented to allow the user to duplicate the spreadsheet and modify it as needed

  9. Application of Prefabricated Panels for the Energy Retrofit of Portuguese Residential Buildings Facades: A Case Study

    Directory of Open Access Journals (Sweden)

    Sousa J.

    2013-09-01

    Full Text Available This article aims to evaluate the potential application of prefabricated panels in energy retrofit of facades in the Portuguese building stock. The fundamentals of this study were part of Annex 50, which was an international ECBCS IEA project, with the purpose of developing an innovative concept of building renovation for the most representative buildings based on prefabricated systems. To analyze the potential application of energy retrofit using prefabricated panels, was important to know the reality of the existing building stock and its morphology. To know the reality of the building stock, an analysis was done based on the existing statistical data and to find the most representative residential buildings, target of the study, three criteria were defined: buildings built before 1990, with 2 to 6 floors and with renovation needs in the exterior envelope.

  10. Retrofit of heat exchanger networks considering pressure drop and existing structure: a new targeting procedure

    International Nuclear Information System (INIS)

    PanjehShahi, M.H.; Nouzari, M.M.

    2002-01-01

    A new retrofit targeting procedure, based on pinch technology has been developed. The procedure considers existing structure and hydrodynamic system of a given network as two main constraint during targeting. The procedure uses a linear programming model to consider existing structure. The model finds a network structure that has maximum compatibility with existing structure. Furthermore, the procedure using the pressure drop equations, can consider decreasing the film coefficients of streams due to increasing network area. Good compatibility between old and new networks and non replacement of hydrodynamic equipment cause to the best use of capital in retrofit projects. The procedure has been checked by doing two case studies, in which the results compared to the established methods, and realized significant improvement

  11. Drivers for retrofit: a sociocultural approach to houses and inhabitants

    DEFF Research Database (Denmark)

    Tjørring, Lise; Gausset, Quentin

    2018-01-01

    , retrofits were investigated from the perspective of the everyday life of homeowners. Three social dimensions that played an important role when the people in the study discussed house renovation were identified and discussed: houses as part of homeowners’ life cycles and personal events; houses......Private households constitute approximately 30% of the total energy consumption in Denmark. The greatest potential for reducing energy consumption in private households is through retrofits of existing houses. One of the most common ways to promote retrofits is the act of sending an energy advisor...... as frameworks for social relations; and houses as markers of social values and status. These results indicate a need to develop new strategies to promote retrofits more effectively, which focus less on the techno-economic aspects and more on the social dimensions....

  12. Building Performance Simulation tools for planning of energy efficiency retrofits

    DEFF Research Database (Denmark)

    Mondrup, Thomas Fænø; Karlshøj, Jan; Vestergaard, Flemming

    2014-01-01

    Designing energy efficiency retrofits for existing buildings will bring environmental, economic, social, and health benefits. However, selecting specific retrofit strategies is complex and requires careful planning. In this study, we describe a methodology for adopting Building Performance...... to energy efficiency retrofits in social housing. To generate energy savings, we focus on optimizing the building envelope. We evaluate alternative building envelope actions using procedural solar radiation and daylight simulations. In addition, we identify the digital information flow and the information...... Simulation (BPS) tools as energy and environmentally conscious decision-making aids. The methodology has been developed to screen buildings for potential improvements and to support the development of retrofit strategies. We present a case study of a Danish renovation project, implementing BPS approaches...

  13. Method for Determining Optimal Residential Energy Efficiency Retrofit Packages

    Energy Technology Data Exchange (ETDEWEB)

    Polly, B.; Gestwick, M.; Bianchi, M.; Anderson, R.; Horowitz, S.; Christensen, C.; Judkoff, R.

    2011-04-01

    Businesses, government agencies, consumers, policy makers, and utilities currently have limited access to occupant-, building-, and location-specific recommendations for optimal energy retrofit packages, as defined by estimated costs and energy savings. This report describes an analysis method for determining optimal residential energy efficiency retrofit packages and, as an illustrative example, applies the analysis method to a 1960s-era home in eight U.S. cities covering a range of International Energy Conservation Code (IECC) climate regions. The method uses an optimization scheme that considers average energy use (determined from building energy simulations) and equivalent annual cost to recommend optimal retrofit packages specific to the building, occupants, and location. Energy savings and incremental costs are calculated relative to a minimum upgrade reference scenario, which accounts for efficiency upgrades that would occur in the absence of a retrofit because of equipment wear-out and replacement with current minimum standards.

  14. Economy Controls Energy Retrofits of Danish Single-family Houses

    DEFF Research Database (Denmark)

    Mortensen, Andrea; Heiselberg, Per; Knudstrup, Mary-Ann

    2014-01-01

    A great energy saving potential is found in the 440,000 Danish single-family houses erected between 1960 and 1979, but the potential is not exploited. To utilize this potential homeowners must be motivated to conduct energy saving retrofits. This paper presents results from a survey from 2012 where...... 883 Danish single-family house owners completed a questionnaire about energy retrofit. The objective of this paper is, based on the survey results, to determine how Danish homeowners can be motivated to conduct energy retrofits. The conclusion is that the financial aspect of an energy retrofit...... about the potential improvements within these parameters is found among the homeowners and therefore there is a vital need for more information about this. A combination of this knowledge of the non-economic improvements, a sensible investment size and information and education about the current...

  15. RETROFITTING CONTROL FACILITIES FOR WET-WEATHER FLOW TREATMENT

    Science.gov (United States)

    Available technologies were evaluated to demonstrate the technical feasibility and cost effectiveness of retrofitting existing facilities to handle wet-weather flow. Cost/benefit relationships were also compared to construction of new conventional control and treatment facilities...

  16. LED Retrofit Kits, TLEDs, and Lighting Controls: An Application Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-03-01

    This document provides guidance for retrofitting existing fluorescent troffers including the LED and associated control options available, the pro/cons and costs/benefits of each option, and agency specific requirements (where applicable).

  17. Korean views on needs for international cooperation in development and development of advanced nuclear power systems

    International Nuclear Information System (INIS)

    Yoon, Young Ku; Lee, Byong Whi; Shim, Chang Saeng.

    1993-01-01

    Korea methodology and experience in international cooperation in the field of construction and operation of nuclear power plants as well as Korean views on development and deployment of advanced nuclear nuclear power systems are presented

  18. The design of virtual double-parameter nuclear spectrum acquisition system based on LabVIEW

    International Nuclear Information System (INIS)

    Liu Songqiu; Chen Chuan; Lei Wuhu

    2001-01-01

    This paper introduces the design of virtual double-parameter nuclear spectrum acquisition system based on LabVIEW and NI multifunction DAQ board, and the use of it to measure the double-parameter nuclear spectrum

  19. Indoor Air Quality and Ventilation in Residential Deep Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Less, Brennan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Walker, Iain [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-06-01

    Because airtightening is a significant part of Deep Energy Retrofits (DERs), concerns about ventilation and Indoor Air Quality (IAQ) have emerged. To investigate this, ventilation and IAQ were assessed in 17 non-smoking California Deep Energy Retrofit homes. Inspections and surveys were used to assess household activities and ventilation systems. Pollutant sampling performed in 12 homes included six-day passive samples of nitrogen dioxide (NO2), formaldehyde and air exchange rate (AER); time-resolved data loggers were used to measure particle counts. Half of the homes provided continuous mechanical ventilation. Despite these homes being twice as airtight (3.0 and 7.6 ACH50, respectively), their median AER was indistinguishable from naturally vented homes (0.36 versus 0.37 hr-1). Numerous problems were found with ventilation systems; however, pollutant levels did not reach levels of concern in most homes. Ambient NO2 standards were exceeded in some gas cooking homes that used legacy ranges with standing pilots, and in Passive House-style homes without range hoods exhausted to outside. Cooking exhaust systems were installed and used inconsistently. The majority of homes reported using low-emitting materials, and formaldehyde levels were approximately half those in conventional new CA homes (19.7 versus 36 μg/m3), with emissions rates nearly 40percent less (12.3 versus 20.6 μg/m2/hr.). Presence of air filtration systems led to lower indoor particle number concentrations (PN>0.5: 8.80E+06 PN/m3 versus 2.99E+06; PN>2.5: 5.46E+0.5 PN/m3 versus 2.59E+05). The results indicate that DERs can provide adequate ventilation and IAQ, and that DERs should prioritize source control, particle filtration and well-designed local exhaust systems, while still providing adequate continuous ventilation.

  20. Towards retrofitting integrated gasification combined cycle (IGCC) power plants with solid oxide fuel cells (SOFC) and CO

    NARCIS (Netherlands)

    Thallam Thattai, A.; Oldenbroek, V.D.W.M.; Schoenmakers, L; Woudstra, T.; Purushothaman Vellayani, A.

    2017-01-01

    This article presents a detailed thermodynamic case study based on the Willem-Alexander Centrale (WAC) power plant in the Netherlands towards retrofitting SOFCs in existing IGCC power plants with a focus on near future implementation. Two systems with high percentage (up to 70%) biomass

  1. LP turbine retrofit modernization: Improvements in performance and operation

    International Nuclear Information System (INIS)

    Groenedaal, J.C.; Fowls, L.G.; Subbiah, R.; Maxwell, B.P.; Persson, B.

    1996-01-01

    Westinghouse Electric Corporation retrofitted six low pressure (LP) nuclear turbine rotors and associated blade path components at Ringhals 1, a 1960's vintage English Electric (GEC) unit located near Varobacka, Sweden, and operated by Vattenfall AB. This achieved significant performance improvements and provided improved mechanical features over the original equipment. This paper, discusses design, manufacture, installation, operation and project coordination. The retrofit processes employed for these units can be applied to any potential customers units

  2. Attic Retrofits Using Nail-Base Insulated Panels

    Energy Technology Data Exchange (ETDEWEB)

    Mallay, David [Home Innovation Research Labs; Kochkin, Vladimir [Home Innovation Research Labs

    2018-03-26

    This project developed and demonstrated a roof/attic energy retrofit solution using nail-base insulated panels for existing homes where traditional attic insulation approaches are not effective or feasible. Nail-base insulated panels (retrofit panels) consist of rigid foam insulation laminated to one face of a wood structural panel. The prefabricated panels are installed above the existing roof deck during a reroofing effort.

  3. Ergodic theory and dynamical systems from a physical point of view

    International Nuclear Information System (INIS)

    Sabbagan, M.; Nasertayoob, P.

    2008-01-01

    Ergodic theory and a large part of dynamical systems are in essence some mathematical modeling, which belongs to statistical physics. This paper is an attempt to present some of the results and principles in ergodic theory and dynamical systems from certain view points of physics such as thermodynamics and classical mechanics. The significance of the varational principle in the statistical physics, the relation between classical approach and statistical approach, also comparison between reversibility from statistical of view are discussed. (author)

  4. Why language really is not a communication system: a cognitive view of language evolution

    OpenAIRE

    Reboul, Anne C.

    2015-01-01

    While most evolutionary scenarios for language see it as a communication system with consequences on the language-ready brain, there are major difficulties for such a view. First, language has a core combination of features—semanticity, discrete infinity, and decoupling—that makes it unique among communication systems and that raise deep problems for the view that it evolved for communication. Second, extant models of communication systems—the code model of communication (Millikan, 2005) and ...

  5. Towards Integration of CAx Systems and a Multiple-View Product Modeller in Mechanical Design

    Directory of Open Access Journals (Sweden)

    H. Song

    2005-01-01

    Full Text Available This paper deals with the development of an integration framework and its implementation for the connexion of CAx systems and multiple-view product modelling. The integration framework is presented regarding its conceptual level and the implementation level is described currently with the connexion of a functional modeller, a multiple-view product modeller, an optimisation module and a CAD system. The integration between the multiple-view product modeller and CATIA V5 based on the STEP standard is described in detail. Finally, the presented works are discussed and future research developments are suggested. 

  6. A multi-view face recognition system based on cascade face detector and improved Dlib

    Science.gov (United States)

    Zhou, Hongjun; Chen, Pei; Shen, Wei

    2018-03-01

    In this research, we present a framework for multi-view face detect and recognition system based on cascade face detector and improved Dlib. This method is aimed to solve the problems of low efficiency and low accuracy in multi-view face recognition, to build a multi-view face recognition system, and to discover a suitable monitoring scheme. For face detection, the cascade face detector is used to extracted the Haar-like feature from the training samples, and Haar-like feature is used to train a cascade classifier by combining Adaboost algorithm. Next, for face recognition, we proposed an improved distance model based on Dlib to improve the accuracy of multiview face recognition. Furthermore, we applied this proposed method into recognizing face images taken from different viewing directions, including horizontal view, overlooks view, and looking-up view, and researched a suitable monitoring scheme. This method works well for multi-view face recognition, and it is also simulated and tested, showing satisfactory experimental results.

  7. Trust in the justice system: A comparative view across Europe

    NARCIS (Netherlands)

    S.G.J. Van de Walle (Steven)

    2009-01-01

    textabstractThe justice system is not one of the most trusted institutions in the UK. While most citizens consider it fair, they also think it is out of touch in specific cases, and many consider it relatively inefficient. The UK is not alone. Many governments throughout Europe and the wider world

  8. Adaptation of the control system in view of SPIRAL integration

    International Nuclear Information System (INIS)

    Lecorche, E.

    1998-01-01

    As soon as the collaboration between the SPIRAL project and the Control Group has been defined, the first implementation of the SPIRAL control system started following various directions. Both the global hardware and software architectures has been specified and some practical works have been undertaken such as the Ethernet network installation or the first SPIRAL oriented software design and coding. (authors)

  9. Retrofit of distillation columns in biodiesel production plants

    International Nuclear Information System (INIS)

    Nguyen, Nghi; Demirel, Yasar

    2010-01-01

    Column grand composite curves and the exergy loss profiles produced by the Column-Targeting Tool of the Aspen Plus simulator are used to assess the performance of the existing distillation columns, and reduce the costs of operation by appropriate retrofits in a biodiesel production plant. Effectiveness of the retrofits is assessed by means of thermodynamics and economic improvements. We have considered a biodiesel plant utilizing three distillation columns to purify biodiesel (fatty acid methyl ester) and byproduct glycerol as well as reduce the waste. The assessments of the base case simulation have indicated the need for modifications for the distillation columns. For column T202, the retrofits consisting of a feed preheating and reflux ratio modification have reduced the total exergy loss by 47%, while T301 and T302 columns exergy losses decreased by 61% and 52%, respectively. After the retrofits, the overall exergy loss for the three columns has decreased from 7491.86 kW to 3627.97 kW. The retrofits required a fixed capital cost of approximately $239,900 and saved approximately $1,900,000/year worth of electricity. The retrofits have reduced the consumption of energy considerably, and leaded to a more environmentally friendly operation for the biodiesel plant considered.

  10. Innovative Retrofit Insulation Strategies for Concrete Masonry Foundations

    Energy Technology Data Exchange (ETDEWEB)

    Huelman, P. [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Goldberg, L. [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership; Jacobson, R. [Univ. of Minnesota, St. Paul, MN (United States). NorthernSTAR Building America Partnership

    2015-05-06

    This study was designed to test a new approach for foundation insulation retrofits, with the goal of demonstrating improved moisture control, improved occupant comfort, and reduced heat loss. Because conducting experimental research on existing below-grade assemblies is very difficult, most of the results are based on simulations. The retrofit approach consists of filling open concrete block cores with an insulating material and adding R-10 exterior insulation that extends 1 ft below grade. The core fill is designed to improve the R-value of the foundation wall and increase the interior wall surface temperature, but more importantly to block convection currents that could otherwise increase moisture loads on the foundation wall and interior space. The exterior insulation significantly reduces heat loss through the most exposed part of the foundation and further increases the interior wall surface temperature. This improves occupant comfort and decreases the risk of condensation. Such an insulation package avoids the full-depth excavation necessary for exterior insulation retrofits, reduces costs, and eliminates the moisture and indoor air quality risks associated with interior insulation retrofits. Retrofit costs for the proposed approach were estimated at roughly half those of a full-depth exterior insulation retrofit.

  11. A Retrospective View to the Magnet Interlock Systems at CERN

    CERN Document Server

    Romera, I; Mompo, R; Puccio, B; Zerlauth, M

    2014-01-01

    Several thousands of both, superconducting and normal conducting magnets are in charge of guiding the particle beams in CERN’s accelerator complex. In order to protect the magnet and powering equipment from damage, dedicated magnet interlock and protection systems are deployed throughout the various accelerators and transfer lines. These systems have worked extremely well during the first years of LHC operation, providing highly dependable interlocking of magnet powering based on industrial COTS components. This paper reviews the performance and experience with more than 70 individual installations during the first LHC running period and compares the operational experience with the initial expectations of dependability. Additional improvements required to address specific operational needs and observed shortcomings are presented. Finally, we review the existing magnet interlock infrastructure in the LHC injector complex and the ongoing renovation works during the first long shutdown.

  12. Differential geometry and topology with a view to dynamical systems

    CERN Document Server

    Burns, Keith

    2005-01-01

    MANIFOLDSIntroductionReview of topological conceptsSmooth manifoldsSmooth mapsTangent vectors and the tangent bundleTangent vectors as derivationsThe derivative of a smooth mapOrientationImmersions, embeddings and submersionsRegular and critical points and valuesManifolds with boundarySard's theoremTransversalityStabilityExercisesVECTOR FIELDS AND DYNAMICAL SYSTEMSIntroductionVector fieldsSmooth dynamical systemsLie derivative, Lie bracketDiscrete dynamical systemsHyperbolic fixed points and periodic orbitsExercisesRIEMANNIAN METRICSIntroductionRiemannian metricsStandard geometries on surfacesExercisesRIEMANNIAN CONNECTIONS AND GEODESICSIntroductionAffine connectionsRiemannian connectionsGeodesicsThe exponential mapMinimizing properties of geodesicsThe Riemannian distanceExercisesCURVATUREIntroductionThe curvature tensorThe second fundamental formSectional and Ricci curvaturesJacobi fieldsManifolds of constant curvatureConjugate pointsHorizontal and vertical sub-bundlesThe geodesic flowExercisesTENSORS AND DI...

  13. Action Information Management System (AIMS): a User's View

    Science.gov (United States)

    Wiskerchen, M.

    1984-01-01

    The initial approach used in establishing a user-defined information system to fulfill the needs of users at NASA Headquarters was unsuccessful in bringing this pilot endeaveor to full project status. The persistence of several users and the full involvement of the Ames Research Center were the ingredients needed to make the AIMS project a success. The lesson learned from this effort is that NASA should always work from its organizational strengths as a Headquarters-Center partnership.

  14. 2D electron systems viewed through an RF spectrometer

    International Nuclear Information System (INIS)

    Andrei, E.Y.

    1994-01-01

    Electrons trapped at the liquid helium-vacuum interface are an almost ideal realization of a 2D electron system. I will describe experiments probing the in-plane as well as the out-of-plane motion of the electrons. The former have emphasized the dynamics and thermodynamics of the electronic motion within the plane to understand the nature of the liquid-solid transition and to outline its phase boundary. The latter have studied the escape out of the electron layer and provided an opportunity to observe tunneling in a clean and well-characterized system as well as to measure the effects of correlations on the tunneling process. More recently experiments in the presence of a magnetic field transverse to the direction of tunneling have revealed several novel phenomena associated with the magnetic coupling between the in-plane and the out-of-plane electronic motions. Together, these experiments helped uncover the multi-faceted physics that can be found in this system. (orig.)

  15. Foster Wheeler Solar Development Corporation modular industrial solar retrofit qualification test results

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.; Lewandoski, A.A.

    1986-10-01

    Under the Department of Energy's Modular Industrial Solar Retrofit project, industrial process steam systems incorporating line-focus solar thermal collectors were designed and hardware was installed and tested. This report describes the test results for the system designed by Foster Wheeler Solar Development Corporation. The test series included function and safety tests to determine that the system operated as specified, an unattended operations test to demonstrate automatic operation, performance tests to provide a database for predicting system performance, and life cycle tests to evaluate component and maintenance requirements. Component-level modifications to improve system performance and reliability were also evaluated.

  16. Foster Wheeler Solar Development Corporation Modular Industrial Solar Retrofit qualification test results

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.; Lewandowski, A.A.

    1987-04-01

    Under the Department of Energy's Modular Industrial Solar Retrofit project, industrial process steam systems incorporating line-focus solar thermal collectors were designed and hardware was installed and tested. This report describes the test results for the system designed by Foster Wheeler Solar Development Corporation. The test series included function and safety tests to determine that the system operated as specified, an unattended operations test to demonstrate automatic operation, performance tests to provide a database for predicting system performance, and life cycle tests to evaluate component and maintenance requirements. Component-level modifications to improve system performance and reliability were also evaluated.

  17. Workshop on development and view on digital safety system of KNICS

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-05-15

    The contents of this workshop are vision of KNICS, introduction of development of safety system of KNICS, development situation of safety class of PLC, view of software for safety-critical system in PLC, RTOS development by shaping, quality assurance and attestation of PLC, development situation of nuclear reactor system and development situation of ESF-CCS.

  18. Workshop on development and view on digital safety system of KNICS

    International Nuclear Information System (INIS)

    2006-05-01

    The contents of this workshop are vision of KNICS, introduction of development of safety system of KNICS, development situation of safety class of PLC, view of software for safety-critical system in PLC, RTOS development by shaping, quality assurance and attestation of PLC, development situation of nuclear reactor system and development situation of ESF-CCS

  19. Information Systems Management: an Australasian view of key issues - 1996

    Directory of Open Access Journals (Sweden)

    Graham Pervan

    1997-11-01

    Full Text Available As part of a longitudinal study of key information systems management issues, a survey of Australasia's largest 500 organisations was conducted to identify which issues were perceived by the IS executives as being important, problematic and critical over the next three to five years. The most critical issues were revealed to be a mix of technology management issues (IT infrastructure, communications, disaster recovery, strategic management issues (competitive advantage, IS planning, aligning the IS organisation, people management issues (organisational learning, educating senior management in IT, systems development and data management issues (effective use of the data resource, and end-user computing. This reflects the need for a balance of business, technical, and people skills in an IS executive. Non-critical issues were mostly related to systems development and the individual technologies which must be integrated and managed to ensure a responsive IT infrastructure. The study also reveals that some issues are much more important than problematic (disaster recovery, competitive advantage, information architecture, and IS alignment while others are much more problematic than important (end-user computing, IS role and contribution, and BPR. The former reflects a growing level of knowledge in handling these issues, while the latter reflects a continuing problem with them. The differences between this study and similar studies conducted in 1988 and 1992 show that there is a growing confidence in the IS executive's ability to manage the strategic issues, a continuing concern about providing a responsive IT infrastructure (especially communications, and a continuing concern with educating all 'customers' in the organisation in the effective use of IT, including senior management.

  20. Nano/micro-electro mechanical systems: a patent view

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Guangyuan, E-mail: hu.guangyuan@mail.shufe.edu.cn, E-mail: hu.guangyuan@shufe.edu.cn [Shanghai University of Finance and Economics, School of Public Economics and Administration (China); Liu, Weishu [Shanghai Jiao Tong University, Antai College of Economics and Management (China)

    2015-12-15

    Combining both bibliometrics and citation network analysis, this research evaluates the global development of micro-electro mechanical systems (MEMS) research based on the Derwent Innovations Index database. We found that worldwide, the growth trajectory of MEMS patents demonstrates an approximate S shape, with United States, Japan, China, and Korea leading the global MEMS race. Evidenced by Derwent class codes, the technology structure of global MEMS patents remains steady over time. Yet there does exist a national competitiveness component among the top country players. The latecomer China has become the second most prolific country filing MEMS patents, but its patent quality still lags behind the global average.

  1. Nano/micro-electro mechanical systems: a patent view

    International Nuclear Information System (INIS)

    Hu, Guangyuan; Liu, Weishu

    2015-01-01

    Combining both bibliometrics and citation network analysis, this research evaluates the global development of micro-electro mechanical systems (MEMS) research based on the Derwent Innovations Index database. We found that worldwide, the growth trajectory of MEMS patents demonstrates an approximate S shape, with United States, Japan, China, and Korea leading the global MEMS race. Evidenced by Derwent class codes, the technology structure of global MEMS patents remains steady over time. Yet there does exist a national competitiveness component among the top country players. The latecomer China has become the second most prolific country filing MEMS patents, but its patent quality still lags behind the global average

  2. Regional view of a Trans-African Drainage System

    Directory of Open Access Journals (Sweden)

    Mohamed Abdelkareem

    2015-05-01

    Full Text Available Despite the arid to hyperarid climate of the Great Sahara of North Africa, pluvial climates dominated the region. Radar data shed some light on the postulated Trans-African Drainage System and its relationship to active and inactive tributaries of the Nile basin. Interpretations of recent elevation data confirm a source of the river water from the Red Sea highlands did not connect the Atlantic Ocean across Tushka basin, highlands of Uwinate and Darfur, and Chad basin, but northward to the ancestral Nile Delta. Elements of topography and climate were considered. They show that the former segments of the Nile closely mirror present-day tributaries of the Nile basin in drainage geometry, landscape, and climate. A rainfall data interpolation scenario revealed that this basin received concurrent runoff from both flanks such as Gabgaba-Allaqi to the east and Tushka basin to the west, similar to present-day Sobat and White Nile tributaries, respectively. Overall the western tributaries such as those of Tushka basin and Howar lead to the Nile, which was (and still is the biggest river system in Africa.

  3. Regional view of a Trans-African Drainage System

    Science.gov (United States)

    Abdelkareem, Mohamed; El-Baz, Farouk

    2014-01-01

    Despite the arid to hyperarid climate of the Great Sahara of North Africa, pluvial climates dominated the region. Radar data shed some light on the postulated Trans-African Drainage System and its relationship to active and inactive tributaries of the Nile basin. Interpretations of recent elevation data confirm a source of the river water from the Red Sea highlands did not connect the Atlantic Ocean across Tushka basin, highlands of Uwinate and Darfur, and Chad basin, but northward to the ancestral Nile Delta. Elements of topography and climate were considered. They show that the former segments of the Nile closely mirror present-day tributaries of the Nile basin in drainage geometry, landscape, and climate. A rainfall data interpolation scenario revealed that this basin received concurrent runoff from both flanks such as Gabgaba-Allaqi to the east and Tushka basin to the west, similar to present-day Sobat and White Nile tributaries, respectively. Overall the western tributaries such as those of Tushka basin and Howar lead to the Nile, which was (and still is) the biggest river system in Africa. PMID:26257941

  4. Factor Analysis on Criteria Affecting Lean Retrofit for Energy Efficient Initiatives in Higher Learning Institution Buildings

    Directory of Open Access Journals (Sweden)

    Abidin Nur IzieAdiana

    2017-01-01

    Full Text Available The expansion of Higher Learning Institution (HLI is a global concerns on energy demand due to campus act like a small city. Intensive mode of operation of a building is correlated to the energy utilization. Improvement in the current energy efficiency is crucial effort to minimize the environmental effect through minimisation of energy in operation by retrofitting and upgrade the existing building system or components to be more efficient. Basically, there are three recommended steps for the improvement known as lean initiatives, green technology and clean energy in response to becoming zero energy solutions for building. The deliberation of this paper is aimed to highlight the criteria affecting in retrofitting of existing building in HLI with lean initiatives in order to achieve energy efficiency and reduction of energy comsumption. Attention is devoted to reviewing the lean energy retrofitting initiatives criteria for daylighting (side lighting, daylighting (skylight and glazing. The questionnaire survey was employed and distributed to the architects who has an expertise in green building design. Factor analysis was adopted as a method of analysis by using Principal Component with Varimax Rotation. The result is presented through summarizing the sub-criteria according to its importance with a factor loading 0.50 and above. The result found that majority of the criteria developed achieved the significant factor loading value and in accordance with the protocal of analysis. In conclusion the results from analysis of this paper assists the stakeholders in assessing the significant criteria based on the desired lean energy retrofitting initiatives and also provides a huge contribution for future planning improvement in existing buildings to become an energy efficient building.

  5. DEMONSTRATION OF A FULL-SCALE RETROFIT OF THE ADVANCED HYBRID PARTICULATE COLLECTOR TECHNOLOGY

    Energy Technology Data Exchange (ETDEWEB)

    Tom Hrdlicka; William Swanson

    2005-12-01

    The Advanced Hybrid Particulate Collector (AHPC), developed in cooperation between W.L. Gore & Associates and the Energy & Environmental Research Center (EERC), is an innovative approach to removing particulates from power plant flue gas. The AHPC combines the elements of a traditional baghouse and electrostatic precipitator (ESP) into one device to achieve increased particulate collection efficiency. As part of the Power Plant Improvement Initiative (PPII), this project was demonstrated under joint sponsorship from the U.S. Department of Energy and Otter Tail Power Company. The EERC is the patent holder for the technology, and W.L. Gore & Associates was the exclusive licensee for this project. The project objective was to demonstrate the improved particulate collection efficiency obtained by a full-scale retrofit of the AHPC to an existing electrostatic precipitator. The full-scale retrofit was installed on an electric power plant burning Powder River Basin (PRB) coal, Otter Tail Power Company's Big Stone Plant, in Big Stone City, South Dakota. The $13.4 million project was installed in October 2002. Project related testing concluded in December 2005. The following Final Technical Report has been prepared for the project entitled ''Demonstration of a Full-Scale Retrofit of the Advanced Hybrid Particulate Collector Technology'' as described in DOE Award No. DE-FC26-02NT41420. The report presents the operation and performance results of the system.

  6. Process industry energy retrofits: the importance of emission baselines for greenhouse gas reductions

    International Nuclear Information System (INIS)

    Aadahl, Anders; Harvey, Simon; Berntsson, Thore

    2004-01-01

    Fuel combustion for heat and/or electric power production is often the largest contributor of greenhouse gas (GHG) emissions from an industrial process plant. Economically feasible options to reduce these emissions include fuel switching and retrofitting the plant's energy system. Process integration methods and tools can be used to evaluate potential retrofit measures. For assessing the GHG emissions reduction potential for the measures considered, it is also necessary to define appropriate GHG emission baselines. This paper presents a systematic GHG emission calculation method for retrofit situations including improved heat exchange, integration of combined heat and power (CHP) units, and combinations of both. The proposed method is applied to five different industrial processes in order to compare the impact of process specific parameters and energy market specific parameters. For potential GHG emission reductions the results from the applied study reveal that electricity grid emissions are significantly more important than differences between individual processes. Based on the results of the study, it is suggested that for sustainable investment decision considerations a conservative emission baseline is most appropriate. Even so, new industrial CHP in the Northern European energy market could play a significant role in the common effort to decrease GHG emissions

  7. Seismic Retrofit of a Multispan Prestressed Concrete Girder Bridge with Friction Pendulum Devices

    Directory of Open Access Journals (Sweden)

    Alberto Maria Avossa

    2018-01-01

    Full Text Available The paper deals with the proposal and application of a procedure for the seismic retrofit of an existing multispan prestressed concrete girder bridge defined explicitly for the use of friction pendulum devices as an isolation system placed between piers top and deck. First, the outcomes of the seismic risk assessment of the existing bridge, performed using an incremental noniterative Nonlinear Static Procedure, based on the Capacity Spectrum Method as well as the Inelastic Demand Response Spectra, are described and discussed. Then, a specific multilevel design process, based on a proper application of the hierarchy of strength considerations and the Direct Displacement-Based Design approach, is adopted to dimension the FPD devices. Furthermore, to assess the impact of the FPD nonlinear behaviour on the bridge seismic response, a device model that reproduces the variation of the normal force and friction coefficient, the bidirectional coupling, and the large deformation effects during nonlinear dynamic analyses was used. Finally, the paper examines the effects of the FPD modelling parameters on the behaviour of the retrofitted bridge and assesses its seismic response with the results pointing out the efficiency of the adopted seismic retrofit solution.

  8. SAFL Baffle retrofit for suspended sediment removal in storm sewer sumps.

    Science.gov (United States)

    Howard, Adam; Mohseni, Omid; Gulliver, John; Stefan, Heinz

    2011-11-15

    Standard sumps (manholes) provide a location for pipe junctions and maintenance access in stormwater drainage systems. Standard sumps can also remove sand and silt particles from stormwater, but have a high propensity for washout of the collected sediment. With appropriate maintenance these sumps may qualify as a stormwater best management practice (BMP) device for the removal of suspended sediment from stormwater runoff. To decrease the maintenance frequency and prevent standard sumps from becoming a source of suspended sediment under high flow conditions, a porous baffle, named the SAFL Baffle, has been designed and tested as a retrofit to the sump. Multiple configurations with varying percent open area and different angles of attack were evaluated in scale models. An optimum configuration was then constructed at the prototype scale and evaluated for both removal efficiency and washout. Results obtained with the retrofit indicate that with the right baffle dimensions and porosity, sediment washout from the sump at high flow rates can be almost eliminated, and removal efficiency can be significantly increased at low flow rates. Removal efficiency and washout functions have been developed for standard sumps retrofitted with the SAFL Baffle. The results of this research provide a new, versatile stormwater treatment device and implemented new washout and removal efficiency testing procedures that will improve research and development of stormwater treatment devices. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. PORST: a computer code to analyze the performance of retrofitted steam turbines

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C.; Hwang, I.T.

    1980-09-01

    The computer code PORST was developed to analyze the performance of a retrofitted steam turbine that is converted from a single generating to a cogenerating unit for purposes of district heating. Two retrofit schemes are considered: one converts a condensing turbine to a backpressure unit; the other allows the crossover extraction of steam between turbine cylinders. The code can analyze the performance of a turbine operating at: (1) valve-wide-open condition before retrofit, (2) partial load before retrofit, (3) valve-wide-open after retrofit, and (4) partial load after retrofit.

  10. Phase space view of quantum mechanical systems and Fisher information

    International Nuclear Information System (INIS)

    Nagy, Á.

    2016-01-01

    Highlights: • Phase-space Fisher information coming from the canonical distribution is derived for the ground state of quantum mechanical systems. • Quantum mechanical phase-space Fisher information contains an extra term due to the position dependence of the temperature. • A complete analogy to the classical case is demonstrated for the linear harmonic oscillator. - Abstract: Pennini and Plastino showed that the form of the Fisher information generated by the canonical distribution function reflects the intrinsic structure of classical mechanics. Now, a quantum mechanical generalization of the Pennini–Plastino theory is presented based on the thermodynamical transcription of the density functional theory. Comparing to the classical case, the phase-space Fisher information contains an extra term due to the position dependence of the temperature. However, for the special case of constant temperature, the expression derived bears resemblance to the classical one. A complete analogy to the classical case is demonstrated for the linear harmonic oscillator.

  11. Phase space view of quantum mechanical systems and Fisher information

    Energy Technology Data Exchange (ETDEWEB)

    Nagy, Á., E-mail: anagy@madget.atomki.hu

    2016-06-17

    Highlights: • Phase-space Fisher information coming from the canonical distribution is derived for the ground state of quantum mechanical systems. • Quantum mechanical phase-space Fisher information contains an extra term due to the position dependence of the temperature. • A complete analogy to the classical case is demonstrated for the linear harmonic oscillator. - Abstract: Pennini and Plastino showed that the form of the Fisher information generated by the canonical distribution function reflects the intrinsic structure of classical mechanics. Now, a quantum mechanical generalization of the Pennini–Plastino theory is presented based on the thermodynamical transcription of the density functional theory. Comparing to the classical case, the phase-space Fisher information contains an extra term due to the position dependence of the temperature. However, for the special case of constant temperature, the expression derived bears resemblance to the classical one. A complete analogy to the classical case is demonstrated for the linear harmonic oscillator.

  12. Evaluating sustainability of truck weight regulations: A system dynamics view

    Directory of Open Access Journals (Sweden)

    Pei Liu

    2015-11-01

    Full Text Available Purpose: Targeting the problem of overload trucking in Highway Transportation of iron ore from Caofeidian to Tangshan (HTCT, this paper aims to assess long-term effects of alternative Truck Weight Regulation (TWR policies on sustainability of HTCT. Design/methodology/approach: A system dynamics model was established for policy evaluation. The model, composed of six interrelating modules, is able to simulate policies effects on trucking issues such as freight flow, truck traffic flow, pavement performance, highway transport capacity and trucking time, and further on the Cumulative Economic Cost (CEC including transport cost and time cost of freight owners and the Cumulative Social Cost (CSC including pavement maintenance cost, green house gas emission cost, air pollutants emission cost and traffic accidents cost, so the effects of TWR policies on sustainability of HTCT could be evaluated. Findings: According to different values of overload ratio which a TWR policy allows, alternative TWR policies are classified into three types, which are The Rigid Policy (TRP, The Moderate Policy (TMP and The Tolerant Policy (TTP. Results show that the best policy for sustainability of HTCT depends on the importance of CSC which is expected by the local government. To be specific, (1 if CSC is considered much less important than CEC, the local government should continue implementing the current TTP with the maximum overload ratio; (2 if CSC is considered much more important than CEC, then TRP is recommended; and (3 if CSC is considered slightly more important than CES, TMP with overload ratio of 80% is the best. Practical implications: Conclusions of this paper may help the local government design appropriate TWR policies to achieve sustainability of HTCT. Originality/value: To the best of our knowledge, this is the first effort to evaluate TWR policies on sustainability of regional freight transportation based on system dynamics modeling.

  13. Pilot Residential Deep Energy Retrofits and the PNNL Lab Homes

    Energy Technology Data Exchange (ETDEWEB)

    Widder, Sarah H.; Chandra, Subrato; Parker, Graham B.; Sande, Susan; Blanchard, Jeremy; Stroer, Dennis; McIlvaine, Janet; Chasar, David; Beal, David; Sutherland, Karen

    2012-01-01

    This report summarizes research investigating the technical and economic feasibility of several pilot deep energy retrofits, or retrofits that save 30% to 50% or more on a whole-house basis while increasing comfort, durability, combustion safety, and indoor air quality. The work is being conducted for the U.S. Department of Energy Building Technologies Program as part of the Building America Program. As part of the overall program, Pacific Northwest National Laboratory (PNNL) researchers are collecting and analyzing a comprehensive dataset that describes pre- and post-retrofit energy consumption, retrofit measure cost, health and comfort impacts, and other pertinent information for each home participating in the study. The research and data collection protocol includes recruitment of candidate residences, a thorough test-in audit, home energy modeling, and generation of retrofit measure recommendations, implementation of the measures, test-out, and continued evaluation. On some homes, more detailed data will be collected to disaggregate energy-consumption information. This multi-year effort began in October 2010. To date, the PNNL team has performed test-in audits on 51 homes in the marine, cold, and hot-humid climate zones, and completed 3 retrofits in Texas, 10 in Florida, and 2 in the Pacific Northwest. Two of the retrofits are anticipated to save 50% or more in energy bills and the others - savings are in the 30% to 40% range. Fourteen other retrofits are under way in the three climate zones. Metering equipment has been installed in seven of these retrofits - three in Texas, three in Florida, and one in the Pacific Northwest. This report is an interim update, providing information on the research protocol and status of the PNNL deep energy retrofit project as of December, 2011. The report also presents key findings and lessons learned, based on the body of work to date. In addition, the report summarizes the status of the PNNL Lab Homes that are new

  14. Energy Performance of Verandas in the Building Retrofit Process

    Directory of Open Access Journals (Sweden)

    Rossano Albatici

    2016-05-01

    Full Text Available Passive solar elements for both direct and indirect gains, are systems used to maintain a comfortable living environment while saving energy, especially in the building energy retrofit and adaptation process. Sunspaces, thermal mass and glazing area and orientation have been often used in the past to guarantee adequate indoor conditions when mechanical devices were not available. After a period of neglect, nowadays they are again considered as appropriate systems to help face environmental issues in the building sector, and both international and national legislation takes into consideration the possibility of including them in the building planning tools, also providing economic incentives. Their proper design needs dynamic simulation, often difficult to perform and time consuming. Moreover, results generally suffer from several uncertainties, so quasi steady-state procedures are often used in everyday practice with good results, but some corrections are still needed. In this paper, a comparative analysis of different solutions for the construction of verandas in an existing building is presented, following the procedure provided by the slightly modified and improved Standard EN ISO 13790:2008. Advantages and disadvantages of different configurations considering thermal insulation, windows typology and mechanical ventilation systems are discussed and a general intervention strategy is proposed. The aim is to highlight the possibility of using sunspaces in order to increase the efficiency of the existing building stock, considering ease of construction and economic viability.

  15. A reticle retrofit and dosimetric consideration for a linear accelerator.

    Science.gov (United States)

    Krithivas, V

    1996-01-01

    An imperfect reticle system in an accelerator causes uncertainties in source-skin distance (SSD), off-axis distance (OAD), isocenter, and so forth. A reticle was designed and fabricated, and its implications on x-ray and electron beam dosimetry were investigated. A new reticle frame was dimensioned to fit snugly in the accelerator. The frame was fabricated to carry a pair of adjustable cross wires and to allow the machine operation in the photon and electron modes. The impact of the cross wires on 6 MV photon and 5-10 MeV electron beam parameters such as dose rate (Gy/monitor unit), beam uniformity, surface dose, and so forth, were studied using suitable ion chambers and phantoms. The retrofitted system offered long-term mechanical stability leading to precise SSD, OAD, and isocenter measurements. Changes introduced by the cross wires on the 6 MV photon and 5-10 MeV electron beams are presented. Long-term stability of a reticle in an accelerator is important for an accurate patient setup and for making reliable dosimetric measurements. Beam characteristrics have to be studied whenever modifications on a reticle system are made.

  16. Economic Valuation of Hypothetical Paratransit Retrofitting

    Directory of Open Access Journals (Sweden)

    Naili Huda

    2015-06-01

    Full Text Available This paper describes a feasibility analysis of conventional and retrofitted paratransits, comparing economic performance of conventional paratransit with those using lead acid and lithium batteries. Research object is Dago-Kalapa paratransit in Bandung, West Java, travelling the distance of 11 km in town, under 8 peak hour operation. After calculating the estimated annual cost and benefit; net present value (NPV, payback period (PBP and internal rate of return (IRR then were quantified to provide feasibility description of those three paratransits. In addition, a sensitivity analysis regarding discount rate, gasoline price and battery price is given to offer broader sense of factors embraced. It is found that both gasoline and lead acid paratransit have big NPVs with only slight differences, while lithium paratransit has negative NPV. This phenomenon applies to their PBPs and IRRs as well. Only when gasoline costs reaches IDR 15,000 will electric paratransit prevails over conventional one. Thus, it can be inferred that at the moment, paratransit runs with gasoline is still the most cost effective compared to its counterparts. However, starting retrofitting from now is endorsed due to its environmental benefit. Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin;}

  17. A multi-criteria model for the comparison of building envelope energy retrofits

    Science.gov (United States)

    Donnarumma, Giuseppe; Fiore, Pierfrancesco

    2017-02-01

    In light of the current EU guidelines in the energy field, improving building envelope performance cannot be separated from the context of satisfying the environmental sustainability requirements, reducing the costs associated with the life cycle of the building as well as economic and financial feasibility. Therefore, identifying the "optimal" energy retrofit solutions requires the simultaneous assessment of several factors and thus becomes a problem of choice between several possible alternatives. To facilitate the work of the decision-makers, public or private, adequate decision support tools are of great importance. Starting from this need, a model based on the multi-criteria analysis "AHP" technique is proposed, along with the definition of three synthetic indices associated with the three requirements of "Energy Performance", "Sustainability Performance" and "Cost". From the weighted aggregation of the three indices, a global index of preference is obtained that allows to "quantify" the satisfaction level of the i-th alternative from the point of view of a particular group of decision-makers. The model is then applied, by way of example, to the case-study of the energetic redevelopment of a former factory, assuming its functional conversion. Twenty possible alternative interventions on the opaque vertical closures, resulting from the combination of three thermal insulators families (synthetic, natural and mineral) with four energy retrofitting techniques are compared and the results obtained critically discussed by considering the point of view of the three different groups of decision-makers.

  18. Pluripotency gene network dynamics: System views from parametric analysis.

    Science.gov (United States)

    Akberdin, Ilya R; Omelyanchuk, Nadezda A; Fadeev, Stanislav I; Leskova, Natalya E; Oschepkova, Evgeniya A; Kazantsev, Fedor V; Matushkin, Yury G; Afonnikov, Dmitry A; Kolchanov, Nikolay A

    2018-01-01

    Multiple experimental data demonstrated that the core gene network orchestrating self-renewal and differentiation of mouse embryonic stem cells involves activity of Oct4, Sox2 and Nanog genes by means of a number of positive feedback loops among them. However, recent studies indicated that the architecture of the core gene network should also incorporate negative Nanog autoregulation and might not include positive feedbacks from Nanog to Oct4 and Sox2. Thorough parametric analysis of the mathematical model based on this revisited core regulatory circuit identified that there are substantial changes in model dynamics occurred depending on the strength of Oct4 and Sox2 activation and molecular complexity of Nanog autorepression. The analysis showed the existence of four dynamical domains with different numbers of stable and unstable steady states. We hypothesize that these domains can constitute the checkpoints in a developmental progression from naïve to primed pluripotency and vice versa. During this transition, parametric conditions exist, which generate an oscillatory behavior of the system explaining heterogeneity in expression of pluripotent and differentiation factors in serum ESC cultures. Eventually, simulations showed that addition of positive feedbacks from Nanog to Oct4 and Sox2 leads mainly to increase of the parametric space for the naïve ESC state, in which pluripotency factors are strongly expressed while differentiation ones are repressed.

  19. Arduino-Based embedded systems interfacing, simulation, and LabVIEW GUI

    CERN Document Server

    Singh, Rajesh; Singh, Bhupendra; Choudhury, Sushabhan

    2018-01-01

    Arduino is an open-source electronics platform based on easy-to-use hardware and software while LabVIEW is a graphical programming telling how to connect functions and work with a variety of datatypes when constructing applications.This book will help beginners to get started with Arduino-based embedded systems including essential know-how of the programming and interfacing of the devices. Book includes programming and simulation of Arduino-based projects and interfacing with LabVIEW, based on practical case studies. The book comprises of total twenty five chapters with description, working model of LabVIEW and programming with Arduino IDE.

  20. SoundView: an auditory guidance system based on environment understanding for the visually impaired people.

    Science.gov (United States)

    Nie, Min; Ren, Jie; Li, Zhengjun; Niu, Jinhai; Qiu, Yihong; Zhu, Yisheng; Tong, Shanbao

    2009-01-01

    Without visual information, the blind people live in various hardships with shopping, reading, finding objects and etc. Therefore, we developed a portable auditory guide system, called SoundView, for visually impaired people. This prototype system consists of a mini-CCD camera, a digital signal processing unit and an earphone, working with built-in customizable auditory coding algorithms. Employing environment understanding techniques, SoundView processes the images from a camera and detects objects tagged with barcodes. The recognized objects in the environment are then encoded into stereo speech signals for the blind though an earphone. The user would be able to recognize the type, motion state and location of the interested objects with the help of SoundView. Compared with other visual assistant techniques, SoundView is object-oriented and has the advantages of cheap cost, smaller size, light weight, low power consumption and easy customization.

  1. A system's view of metro and regional optical networks

    Science.gov (United States)

    Lam, Cedric F.; Way, Winston I.

    2009-01-01

    Developments in fiber optic communications have been rejuvenated after the glut of the overcapacity at the turn of the century. The boom of video-centric network applications finally resulted in another wave of vast build-outs of broadband access networks such as FTTH, DOCSIS 3.0 and WI-FI systems, which in turn also drove up the bandwidth demands in metro and regional WDM networks. These new developments have rekindled research interests on technologies not only to meet the surging demand, but also to upgrade legacy network infrastructures in an evolutionary manner without disrupting existing services and incurring significant capital penalties. Standard bodies such as IEEE, ITU and OIF have formed task forces to ratify 100Gb/s interface standards. Thanks to the seemingly unlimited bandwidth in single-mode fibers, advances in optical networks has traditionally been fueled by more capable physical components such as more powerful laser, cleaner and wider bandwidth optical amplifier, faster modulator and photo-detectors, etc. In the meanwhile, the mainstream modulation technique for fiber optic communication systems has remained the most rudimentary form of on-off keying (OOK) and direct power detection for a very long period of time because spectral efficiency had never been a concern. This scenario, however, is no longer valid as demand for bandwidth is pushing the limit of current of current WDM technologies. In terms of spectral use, all the 100-GHz ITU grids in the C-band have been populated with 10Gb/s wavelengths in most of the WDM transport networks, and we are exhausting the power and bandwidth offered on existing fiber plant EDFAs. Beyond 10Gb/s, increasing the transmission to 40Gb/s by brute force OOK approach incurs significant penalties due to chromatic and polarization mode dispersion. With conventional modulation schemes, transmission impairments at 40Gb/s speed and above already become such difficult challenges that the efforts to manage these

  2. International demands for retrofitting, trends in the nuclear industry, safety margins, concepts and options for retrofit; Nachfrage nach Nachruestungen international; industrielle Trends; Rolle von Sicherheitsmargen, Nachruestkonzepte und -moeglichkeiten

    Energy Technology Data Exchange (ETDEWEB)

    Janke, Rolf; Stoll, Uwe; Grasnick, Claudius [AREVA GmbH, Erlangen (Germany). E and P, P-G

    2016-02-15

    The serious accidents at Fukushima in 2011 pointed out the missing implementation of existing international safety standards for nuclear power plants as also new aspects for nuclear safety. The main safety aspects in the aftermath of Fukushima are: robustness against internal and external impacts; sufficient safety margins; prolonged periods for safety measures; inherent and passive systems and mechanisms; enhanced independent operation of the plant in case of external failures; independent long-term supply with AC; accident management procedures; enhanced retention of radionuclides. Technologies for retrofit are available and are under implementation with respect to the demands and options in the countries using nuclear power.

  3. [The research in a foot pressure measuring system based on LabVIEW].

    Science.gov (United States)

    Li, Wei; Qiu, Hong; Xu, Jiang; He, Jiping

    2011-01-01

    This paper presents a system of foot pressure measuring system based on LabVIEW. The designs of hardware and software system are figured out. LabVIEW is used to design the application interface for displaying plantar pressure. The system can realize the plantar pressure data acquisition, data storage, waveform display, and waveform playback. It was also shown that the testing results of the system were in line with the changing trend of normal gait, which conformed to human system engineering theory. It leads to the demonstration of system reliability. The system gives vivid and visual results, and provides a new method of how to measure foot-pressure and some references for the design of Insole System.

  4. Design of Remote Power Plant Monitoring System Based on LabVIEW and VC++ Software

    Directory of Open Access Journals (Sweden)

    Dawei Tan

    2013-05-01

    Full Text Available This study designs a real-time remote monitoring system based on LabVIEW and Microsoft Visual C++ for Plant Units. The server written in LabVIEW uses for data acquisition and storage. The server adopts the TCP and DataSocket to communicate with the VC client. The remote VC client can accept real-time data and process data, enabling remote monitoring.

  5. Implementation of Model View Controller (Mvc) Architecture on Building Web-based Information System

    OpenAIRE

    'Uyun, Shofwatul; Ma'arif, Muhammad Rifqi

    2010-01-01

    The purpose of this paper is to introduce the use of MVC architecture in web-based information systemsdevelopment. MVC (Model-View-Controller) architecture is a way to decompose the application into threeparts: model, view and controller. Originally applied to the graphical user interaction model of input,processing and output. Expected to use the MVC architecture, applications can be built maintenance of moremodular, rusable, and easy and migrate. We have developed a management system of sch...

  6. IMPLEMENTATION OF MODEL VIEW CONTROLLER (MVC) ARCHITECTURE ON BUILDING WEB-BASED INFORMATION SYSTEM

    OpenAIRE

    'Uyun, Shofwatul; Ma'arif, Muhammad Rifqi

    2010-01-01

    The purpose of this paper is to introduce the use of MVC architecture in web-based information systemsdevelopment. MVC (Model-View-Controller) architecture is a way to decompose the application into threeparts: model, view and controller. Originally applied to the graphical user interaction model of input,processing and output. Expected to use the MVC architecture, applications can be built maintenance of moremodular, rusable, and easy and migrate. We have developed a management system of sch...

  7. Retrofitting adjustable speed drives for large induction motors

    International Nuclear Information System (INIS)

    Wuestefeld, M.R.; Merriam, C.H.; Porter, N.S.

    2004-01-01

    Adjustable speed drives (ASDs) are used in many power plants to control process flow by varying the speed of synchronous and induction motors. In applications where the flow requirements vary significantly, ASDs reduce energy and maintenance requirements when compared with drag valves, dampers or other methods to control flow. Until recently, high horsepower ASDs were not available for induction motors. However, advances in power electronics technology have demonstrated the reliability and cost effectiveness of ASDs for large horsepower induction motors. Emphasis on reducing operation and maintenance costs and increasing the capacity factor of nuclear power plants has led some utilities to consider replacing flow control devices in systems powered by large induction motors with ASDs. ASDs provide a high degree of reliability and significant energy savings in situations where full flow operation is not needed for a substantial part of the time. This paper describes the basic adjustable speed drive technologies available for large induction motor applications, ASD operating experience and retrofitting ASDs to replace the existing GE Boiling Water Reactor recirculation flow control system

  8. Retrofit electrochromic glazing in a UK office

    Directory of Open Access Journals (Sweden)

    Ruth Kelly Waskett

    2014-12-01

    Full Text Available Electrochromic (EC glazing is now considered a viable alternative to fixed transmittance glazing. It has the potential to enable occupants to control daylight glare and solar heat gain without the use of blinds or external shading devices, giving users more access to daylight with all its inherent benefits. Furthermore, EC glazing can reduce energy consumption by decreasing cooling loads and electric lighting usage. Most research to date has studied the effects of EC glazing in scale models, computer simulations and full scale test rooms, and some of these studies have included human participants. However, there is a general lack of understanding regarding the performance and suitability of EC glazing in real-world working environments. A case study of the first UK retrofit application of EC glazing is being conducted in two adjacent offices in a university campus building. The offices are occupied by administration staff and have large southeastfacing windows. The existing double glazed units were replaced with commercially-available EC glazed units in 2012. Over a period of more than 18 months, the rooms were monitored intensively to record the effect of the EC glazing on both the physical room environment and the occupants themselves. A large amount of data from the monitoring programme is currently undergoing detailed analysis. Initial findings emerging from the installation and post-installation period are described in this paper.

  9. Bellanca building, Yellowknife : building envelope retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Rajewski, G. [A.D. Williams Engineering Inc., Edmonton, AB (Canada)

    2008-07-01

    The Bellanca building is a ten-story, commercial office building, located in Yellowknife, Northwest Territories. The owner was concerned about annual fuel consumption, relative to other buildings of similar size. Tenants reported cold drafts and some ice build-up had been reported in the past, on the exterior of the cladding. In addition, some water penetration had occurred during rainfall. This presentation provided background information on the Bellanca building and discussed a building envelope retrofit project. A.D. Williams was hired in late 2006 in order to provide an opinion on the present condition of the building envelope. This presentation described the site investigation and presented an interior and exterior review of the building. It also presented a thermographic survey in order to map thermal anomalies and establish trends. Following acceptance of the report on findings, one of five options was selected for further development. This included removal of existing cladding, exterior gypsum wallboard, fiberglass insulation and application of BASF Walltite CT foam, sheathing, rigid insulation, drainage plane and new cladding. The preliminary design was then presented. This paper also described the tender and award of the contract; construction phase; and substantial completion of the project. tabs, figs.

  10. Information system for sandstone uranium exploration based on Arc View 3.2

    International Nuclear Information System (INIS)

    Han Shaoyang; Hou Huiqun; Huang Shutao

    2001-01-01

    The compositive platform of the system is geographic information system software-Arc View 3.2. The secondary development has been finished through the language-AVENUE provided by Arc View 3.2. The system integrates all kinds of data, graphic information, analysis results, spatial analysis methods in data processing and integrated evaluation models during the sandstone uranium exploration. According to the need of multi-source-information management and integrated evaluation, a series of new functions was appended to the basic platform through AVENUE language on a basis of sufficiently inheriting Arc View software functions, and the friendly graphic user interface is created so that the system realizes the functions better, which include information query, data base management, graphics editing, geology cartography, model analysis and result outputs

  11. South African Teachers' Views of Collaboration within an Inclusive Education System

    Science.gov (United States)

    Nel, Mirna; Engelbrecht, Petra; Nel, Norma; Tlale, Dan

    2014-01-01

    The development of sustainable collaborative partnerships between different role players within an inclusive education system seems to be a continuous challenge in South Africa. The focus of this research study was to understand how teachers view collaboration within an inclusive education system. Open-ended questionnaires were completed by 85…

  12. Environmental protection standards - from the point of view of systems analysis

    Energy Technology Data Exchange (ETDEWEB)

    Becker, K

    1978-11-01

    A project of the International Institute of Applied Systems Analysis (IIASA) in Laxenburg castle near Vienna is reviewed where standards for environmental protection are interpreted from the point of view of systems analysis. Some examples are given to show how results are influenced not only by technical and economic factors but also by psychological and political factors.

  13. An automatic monitoring system of leak current for testing TGC detectors based on LabVIEW

    International Nuclear Information System (INIS)

    Feng Cunfeng; Lu Taiguo; Yan Zhen; Wang Suojie; Zhu Chengguang; Sun Yansheng; He Mao

    2005-01-01

    An automatic monitoring system of leak current for testing TGC detectors with high voltage was set up by using the graphic LabVIEW platform and NI 4351 data acquisition card. The leak current was automatically monitored and recorded with this system, the time and the value of the leak current were showed instantly. Good efficiency and precision of monitoring were obtained. (authors)

  14. The research of binocular vision ranging system based on LabVIEW

    Science.gov (United States)

    Li, Shikuan; Yang, Xu

    2017-10-01

    Based on the study of the principle of binocular parallax ranging, a binocular vision ranging system is designed and built. The stereo matching algorithm is realized by LabVIEW software. The camera calibration and distance measurement are completed. The error analysis shows that the system fast, effective, can be used in the corresponding industrial occasions.

  15. Environmental protection standards - from the point of view of systems analysis

    International Nuclear Information System (INIS)

    Becker, K.

    1978-01-01

    A project of the International Institute of Applied Systems Analysis (IIASA) in Laxenburg castle near Vienna is reviewed where standards for environmental protection are interpreted from the point of view of systems analysis. Some examples are given to show how results are influenced not only by technical and economic factors but also by psychological and political factors. (orig.) [de

  16. Analytical approach to landside system dynamics at airport passenger terminals: departmentalization and holistic view

    OpenAIRE

    Montesinos Ferrer, Marti

    2016-01-01

    Airport landside system is complex, with multiple interrelations. Currently, each facility is managed locally without a systemic view. This study analyzes the impact of different resource management policies on the overall system performance (embarking direction). The results are derived from an analytical approach, based on queueing theory, which allows investigating different time-varying resource allocation policies at each processing facility and its impact on system dynamics.

  17. Performance Analysis of Retrofitted Tribo-Corrosion Test Rig for Monitoring In Situ Oil Conditions

    Directory of Open Access Journals (Sweden)

    Arpith Siddaiah

    2017-09-01

    Full Text Available Oils and lubricants, once extracted after use from a mechanical system, can hardly be reused, and should be refurbished or replaced in most applications. New methods of in situ oil and lubricant efficiency monitoring systems have been introduced for a wide variety of mechanical systems, such as automobiles, aerospace aircrafts, ships, offshore wind turbines, and deep sea oil drilling rigs. These methods utilize electronic sensors to monitor the “byproduct effects” in a mechanical system that are not indicative of the actual remaining lifecycle and reliability of the oils. A reliable oil monitoring system should be able to monitor the wear rate and the corrosion rate of the tribo-pairs due to the inclusion of contaminants. The current study addresses this technological gap, and presents a novel design of a tribo-corrosion test rig for oils used in a dynamic system. A pin-on-disk tribometer test rig retrofitted with a three electrode-potentiostat corrosion monitoring system was used to analyze the corrosion and wear rate of a steel tribo-pair in industrial grade transmission oil. The effectiveness of the retrofitted test rig was analyzed by introducing various concentrations of contaminants in an oil medium that usually leads to a corrosive working environment. The results indicate that the retrofitted test rig can effectively monitor the in situ tribological performance of the oil in a controlled dynamic corrosive environment. It is a useful method to understand the wear–corrosion synergies for further experimental work, and to develop accurate predictive lifecycle assessment and prognostic models. The application of this system is expected to have economic benefits and help reduce the ecological oil waste footprint.

  18. Performance Analysis of Retrofitted Tribo-Corrosion Test Rig for Monitoring In Situ Oil Conditions.

    Science.gov (United States)

    Siddaiah, Arpith; Khan, Zulfiqar Ahmad; Ramachandran, Rahul; Menezes, Pradeep L

    2017-09-28

    Oils and lubricants, once extracted after use from a mechanical system, can hardly be reused, and should be refurbished or replaced in most applications. New methods of in situ oil and lubricant efficiency monitoring systems have been introduced for a wide variety of mechanical systems, such as automobiles, aerospace aircrafts, ships, offshore wind turbines, and deep sea oil drilling rigs. These methods utilize electronic sensors to monitor the "byproduct effects" in a mechanical system that are not indicative of the actual remaining lifecycle and reliability of the oils. A reliable oil monitoring system should be able to monitor the wear rate and the corrosion rate of the tribo-pairs due to the inclusion of contaminants. The current study addresses this technological gap, and presents a novel design of a tribo-corrosion test rig for oils used in a dynamic system. A pin-on-disk tribometer test rig retrofitted with a three electrode-potentiostat corrosion monitoring system was used to analyze the corrosion and wear rate of a steel tribo-pair in industrial grade transmission oil. The effectiveness of the retrofitted test rig was analyzed by introducing various concentrations of contaminants in an oil medium that usually leads to a corrosive working environment. The results indicate that the retrofitted test rig can effectively monitor the in situ tribological performance of the oil in a controlled dynamic corrosive environment. It is a useful method to understand the wear-corrosion synergies for further experimental work, and to develop accurate predictive lifecycle assessment and prognostic models. The application of this system is expected to have economic benefits and help reduce the ecological oil waste footprint.

  19. Retrofitting of Reinforced Concrete Beams using Reactive Powder Concrete (RPC)

    Science.gov (United States)

    Karthik, S.; Sundaravadivelu, Karthik

    2017-07-01

    Strengthening of existing damaged structures is one of the leading studies in civil engineering. The purpose of retrofitting is to structurally treat the member with an aim to restore the structure to its original strength. The focus of this project is to study the behaviour of damaged Reinforced Concrete beam retrofitted with Reactive Powder Concrete (RPC) Overlay. Reinforced concrete beams of length 1200 mm, width 100 mm and depth 200 mm were casted with M30 grade of concrete in the laboratory and cured for 28 days. One beam is taken as control and are tested under two point loading to find out ultimate load. Remaining beams are subjected to 90 % ultimate load of control beams. The partially damaged beams are retrofitted with Reactive Powder Concrete Overlay at the full tension face of the beam and side overlay depends upon the respectable retrofitting techniques with 10 mm and 20 mm thick layer to find optimum. Materials like steel fibres are added to enhance the ductility by eliminating coarse particle for homogeneity of the structure. Finally, the modes of failure for retrofitted beams are analysed experimentally under two point loading & compared the results with Control beam.

  20. The impact of domestic energy efficiency retrofit schemes on householder attitudes and behaviours

    NARCIS (Netherlands)

    Long, T.B.; Young, W.; Webber, P.; Gouldson, A.; Harwatt, H.

    2015-01-01

    Retrofitting existing housing stock to improve energy efficiency is often required to meet climate mitigation, public health and fuel poverty targets. Increasing uptake and effectiveness of retrofit schemes requires understanding of their impacts on householder attitudes and behaviours. This paper

  1. Selecting Energy Efficient Building Envelope Retrofits to Existing Department of Defense Building Using Value Focused Thinking

    National Research Council Canada - National Science Library

    Pratt, David M

    2006-01-01

    ... these facilities that have the greatest potential for energy efficient building envelope retrofits. There are hundreds of various new building envelope technologies available to retrofit an existing building envelope, including window, roof, and wall technologies...

  2. Liquid balance monitoring inside conventional, Retrofit, and bio-reactor landfill cells.

    Science.gov (United States)

    Abichou, Tarek; Barlaz, Morton A; Green, Roger; Hater, Gary

    2013-10-01

    The Outer Loop landfill bioreactor (OLLB) in Louisville, KY, USA has been the site of a study to evaluate long-term bioreactor performance at a full-scale operational landfill. Three types of landfill units were studied including a conventional landfill (Control cell), a new landfill area that had an air addition and recirculation piping network installed as waste was being placed (As-Built cell), and a conventional landfill that was modified to allow for liquids recirculation (Retrofit cell). During the monitoring period, the Retrofit, Control, and As-Built cells received 48, 14, and 213LMg(-1) (liters of liquids per metric ton of waste), respectively. The leachate collection system yielded 60, 57 and 198LMg(-1) from the Retrofit, Control, and As-Built cells, respectively. The head on liner in all cells was below regulatory limits. In the Control and As-Built cells, leachate head on liner decreased once waste placement stopped. The measured moisture content of the waste samples was consistent with that calculated from the estimate of accumulated liquid by the liquid balance. Additionally, measurements on excavated solid waste samples revealed large spatial variability in waste moisture content. The degree of saturation in the Control cells decreased from 85% to 75%. The degree of saturation increased from 82% to 83% due to liquids addition in the Retrofit cells and decreased back to 80% once liquid addition stopped. In the As-Built cells, the degree of saturation increased from 87% to 97% during filling activities and then started to decrease soon after filling activities stopped to reach 92% at the end of the monitoring period. The measured leachate generation rates were used to estimate an in-place saturated hydraulic conductivity of the MSW in the range of 10(-8) to 10(-7)ms(-1) which is lower than previous reports. In the Control and Retrofit cells, the net loss in liquids, 43 and 12LMg(-1), respectively, was similar to the measured settlement of 15% and 5

  3. Retrofit and preoccupancy radon mitigation program for homes

    International Nuclear Information System (INIS)

    Ibach, M.T.; Gallagher, J.H. Jr.

    1987-01-01

    A requirement was levied on a Maryland builder by the FHA to demonstrate acceptable radon levels in his homes before they would be approved for loans. This paper describes the use of products shown by appropriate tests to be effective radon barriers to meet this requirement. The sheet goods can be used in exterior and interior applications on foundation walls. The other is applied to the interior floors and/or walls of the basement area. Product installation procedures are straightforward and relatively simple. Problems encountered were routine and concerned primarily the complete sealing of floor and wall penetrations, window openings, sealing the top of the wall under the sill plate, and the location and mounting of permanent fixtures on walls and floors. Also discussed are methods of repairing ruptures of the seal, warranties to protect the homeowner, support systems and costs. Conclusions are that effective reductions in radon levels can be achieved by the application of sealants during the construction of new homes or as a retrofit to existing structures

  4. Liquid balance monitoring inside conventional, Retrofit, and bio-reactor landfill cells

    Energy Technology Data Exchange (ETDEWEB)

    Abichou, Tarek, E-mail: abichou@eng.fsu.edu [Department of Civil and Environmental Engineering, Florida State University, 2525 Pottsdamer Street, Tallahassee, FL 32311 (United States); Barlaz, Morton A. [Department of Civil, Construction, and Environmental Engineering, North Carolina State University, Raleigh, NC 27695 (United States); Green, Roger; Hater, Gary [Waste Management Inc., Cincinnati, OH 45211 (United States)

    2013-10-15

    Highlights: • The Retrofit, Control, and As-Built cells received 48, 14, and 213 L Mg{sup −1} (liters of liquids per metric ton of waste). • The leachate collection system yielded 60, 57 and 198 L Mg{sup −1} from the Retrofit, Control, and As-Built cells. • The head on liner in all cells was below regulatory limits. • Measured moisture content of the waste samples was consistent with that calculated from accumulated liquid by balance. • The in-place saturated hydraulic conductivity of the MSW was calculated to be in the range of 10{sup −8} to 10{sup −7} m s{sup −1}. - Abstract: The Outer Loop landfill bioreactor (OLLB) in Louisville, KY, USA has been the site of a study to evaluate long-term bioreactor performance at a full-scale operational landfill. Three types of landfill units were studied including a conventional landfill (Control cell), a new landfill area that had an air addition and recirculation piping network installed as waste was being placed (As-Built cell), and a conventional landfill that was modified to allow for liquids recirculation (Retrofit cell). During the monitoring period, the Retrofit, Control, and As-Built cells received 48, 14, and 213 L Mg{sup −1} (liters of liquids per metric ton of waste), respectively. The leachate collection system yielded 60, 57 and 198 L Mg{sup −1} from the Retrofit, Control, and As-Built cells, respectively. The head on liner in all cells was below regulatory limits. In the Control and As-Built cells, leachate head on liner decreased once waste placement stopped. The measured moisture content of the waste samples was consistent with that calculated from the estimate of accumulated liquid by the liquid balance. Additionally, measurements on excavated solid waste samples revealed large spatial variability in waste moisture content. The degree of saturation in the Control cells decreased from 85% to 75%. The degree of saturation increased from 82% to 83% due to liquids addition in the Retrofit

  5. Liquid balance monitoring inside conventional, Retrofit, and bio-reactor landfill cells

    International Nuclear Information System (INIS)

    Abichou, Tarek; Barlaz, Morton A.; Green, Roger; Hater, Gary

    2013-01-01

    Highlights: • The Retrofit, Control, and As-Built cells received 48, 14, and 213 L Mg −1 (liters of liquids per metric ton of waste). • The leachate collection system yielded 60, 57 and 198 L Mg −1 from the Retrofit, Control, and As-Built cells. • The head on liner in all cells was below regulatory limits. • Measured moisture content of the waste samples was consistent with that calculated from accumulated liquid by balance. • The in-place saturated hydraulic conductivity of the MSW was calculated to be in the range of 10 −8 to 10 −7 m s −1 . - Abstract: The Outer Loop landfill bioreactor (OLLB) in Louisville, KY, USA has been the site of a study to evaluate long-term bioreactor performance at a full-scale operational landfill. Three types of landfill units were studied including a conventional landfill (Control cell), a new landfill area that had an air addition and recirculation piping network installed as waste was being placed (As-Built cell), and a conventional landfill that was modified to allow for liquids recirculation (Retrofit cell). During the monitoring period, the Retrofit, Control, and As-Built cells received 48, 14, and 213 L Mg −1 (liters of liquids per metric ton of waste), respectively. The leachate collection system yielded 60, 57 and 198 L Mg −1 from the Retrofit, Control, and As-Built cells, respectively. The head on liner in all cells was below regulatory limits. In the Control and As-Built cells, leachate head on liner decreased once waste placement stopped. The measured moisture content of the waste samples was consistent with that calculated from the estimate of accumulated liquid by the liquid balance. Additionally, measurements on excavated solid waste samples revealed large spatial variability in waste moisture content. The degree of saturation in the Control cells decreased from 85% to 75%. The degree of saturation increased from 82% to 83% due to liquids addition in the Retrofit cells and decreased back to 80

  6. Optical design of an athermalised dual field of view step zoom optical system in MWIR

    Science.gov (United States)

    Kucukcelebi, Doruk

    2017-08-01

    In this paper, the optical design of an athermalised dual field of view step zoom optical system in MWIR (3.7μm - 4.8μm) is described. The dual field of view infrared optical system is designed based on the principle of passive athermalization method not only to achieve athermal optical system but also to keep the high image quality within the working temperature between -40°C and +60°C. The infrared optical system used in this study had a 320 pixel x 256 pixel resolution, 20μm pixel pitch size cooled MWIR focal plane array detector. In this study, the step zoom mechanism, which has the axial motion due to consisting of a lens group, is considered to simplify mechanical structure. The optical design was based on moving a single lens along the optical axis for changing the optical system's field of view not only to reduce the number of moving parts but also to athermalize for the optical system. The optical design began with an optimization process using paraxial optics when first-order optics parameters are determined. During the optimization process, in order to reduce aberrations, such as coma, astigmatism, spherical and chromatic aberrations, aspherical surfaces were used. As a result, athermalised dual field of view step zoom optical design is proposed and the performance of the design using proposed method was verified by providing the focus shifts, spot diagrams and MTF analyzes' plots.

  7. System for electrochemical investigations based on a PC and the Lab VIEW package

    Directory of Open Access Journals (Sweden)

    Stević Zoran

    2007-01-01

    Full Text Available This paper describes an electrochemical research system based on the Lab VIEW computer software package. An overview of well known electrochemical methods, such as potential measurements, chronopotentiometry, chronoamperometry, cyclic voltammetry and EIS is given. Electrochemical impedance spectroscopy has been adapted for systems containing large capacitances. For signal generation and recording of the response of the investigated electrochemical cell, a measurement and control system was developed, based on a PC P4 computer. The rest of the hardware consists of a commercially available AD-DA converter and an external interface for analog signal processing. The interface is a result of the authors own research. The software platform for the desired measurement methods is Lab VIEW package, which is regarded as a high standard in the area of modern virtual instruments. The developed system was adjusted, tested and compared with other commercially available systems. One such system is in constant use at the Technical Faculty in Bor.

  8. Assessing the Needs and Gaps of Building Information Technologies for Energy Retrofit of Historic Buildings in the Korean Context

    Directory of Open Access Journals (Sweden)

    Sean Hay Kim

    2018-04-01

    Full Text Available Most domestic modern buildings from the early 1900s have been constructed as heavy mass, and for many years have relied on passive measures for climate control. Since effective passive measures eventually reduce the heating and cooling loads, thus also reducing the system size, passive and hybrid measures are the most preferred Energy Conservation Measures (ECMs. In addition, the domestic situation and climate are additional constraints in energy retrofit decision making, such as a shorter budget and time, poor maintenance history, and uncertainties in vernacular lifestyle. For this reason, the performance improvement and side-effects prior to installing ECMs should be predictable, particularly in case the originality can be damaged. This complexity confirms that simulation-based Measurement and Verification (M&V would better suit the energy retrofit of domestic historic buildings. However, many domestic investors still believe re-construction has a larger economic value than restoration. Therefore, they are even unwilling to invest in more time than a preset audit period—typically less than a week. Although simulation-based M&V is theoretically favored for retrofit decision making, its process including collecting data, modeling and analysis, and evaluating and designing ECMs could still be too demanding to domestic practitioners. While some manual, repetitive, error-prone works exist in the conventional retrofit process and simulation-based M&V, it is proposed here that enhanced Building Information Technology (BIT is able to simplify, automate, and objectify, at least the critical steps of the retrofit project. The aim of this study is to find an efficient and effective energy retrofit strategy for domestic historic buildings that appeals to both domestic investors and practitioners by testing selective BIT tools on an actual historic building. This study concludes with the suggestion that software vendors are asked to develop enhanced

  9. Error Analysis and Calibration Method of a Multiple Field-of-View Navigation System

    OpenAIRE

    Shi, Shuai; Zhao, Kaichun; You, Zheng; Ouyang, Chenguang; Cao, Yongkui; Wang, Zhenzhou

    2017-01-01

    The Multiple Field-of-view Navigation System (MFNS) is a spacecraft subsystem built to realize the autonomous navigation of the Spacecraft Inside Tiangong Space Station. This paper introduces the basics of the MFNS, including its architecture, mathematical model and analysis, and numerical simulation of system errors. According to the performance requirement of the MFNS, the calibration of both intrinsic and extrinsic parameters of the system is assumed to be essential and pivotal. Hence, a n...

  10. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Science.gov (United States)

    2013-02-12

    ... Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Pilot Program AGENCY...: On March 31, 2011, HUD published a notice that announced HUD's FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program) known as FHA PowerSaver, which is a pilot program conducted for loans...

  11. 75 FR 21016 - Notice of Proposed Information Collection: Comment Request; The Green Retrofit Program of the...

    Science.gov (United States)

    2010-04-22

    ... Information Collection: Comment Request; The Green Retrofit Program of the American Recovery and... Retrofit Program authorized by the American Recovery and Revitalization Act of 2009. The legislation.... The Green Retrofit Program is detailed in HUD Notice H 09-02 issued on May 13, 2009. This Notice is...

  12. 40 CFR 1043.50 - Approval of methods to meet Tier 1 retrofit NOX standards.

    Science.gov (United States)

    2010-07-01

    ... retrofit NOX standards. 1043.50 Section 1043.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... SUBJECT TO THE MARPOL PROTOCOL § 1043.50 Approval of methods to meet Tier 1 retrofit NOX standards. Regulation 13 of Annex VI provides for certification of Approved Methods, which are retrofit procedures that...

  13. Measure Guideline: Three High Performance Mineral Fiber Insulation Board Retrofit Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Neuhauser, Ken [Building Science Corporation, Westford, MA (United States)

    2015-01-01

    This Measure Guideline describes a high performance enclosure retrofit package that uses mineral fiber insulation board. The Measure Guideline describes retrofit assembly and details for wood frame roof and walls and for cast concrete foundations. This Measure Guideline is intended to serve contractors and designers seeking guidance for non-foam exterior insulation retrofit.

  14. Measure Guideline: Three High Performance Mineral Fiber Insulation Board Retrofit Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Neuhauser, K. [Building Science Corporation, Westford, MA (United States)

    2015-01-01

    This Measure Guideline describes a high performance enclosure retrofit package that uses mineral fiber insulation board, and is intended to serve contractors and designers seeking guidance for non-foam exterior insulation retrofit processes. The guideline describes retrofit assembly and details for wood frame roof and walls and for cast concrete foundations.

  15. A comparison between digital images viewed on a picture archiving and communication system diagnostic workstation and on a PC-based remote viewing system by emergency physicians.

    Science.gov (United States)

    Parasyn, A; Hanson, R M; Peat, J K; De Silva, M

    1998-02-01

    Picture Archiving and Communication Systems (PACS) make possible the viewing of radiographic images on computer workstations located where clinical care is delivered. By the nature of their work this feature is particularly useful for emergency physicians who view radiographic studies for information and use them to explain results to patients and their families. However, the high cost of PACS diagnostic workstations with fuller functionality places limits on the number of and therefore the accessibility to workstations in the emergency department. This study was undertaken to establish how well less expensive personal computer-based workstations would work to support these needs of emergency physicians. The study compared the outcome of observations by 5 emergency physicians on a series of radiographic studies containing subtle abnormalities displayed on both a PACS diagnostic workstation and on a PC-based workstation. The 73 digitized radiographic studies were randomly arranged on both types of workstation over four separate viewing sessions for each emergency physician. There was no statistical difference between a PACS diagnostic workstation and a PC-based workstation in this trial. The mean correct ratings were 59% on the PACS diagnostic workstations and 61% on the PC-based workstations. These findings also emphasize the need for prompt reporting by a radiologist.

  16. PCI bus data transmission system based on LabVIEW language

    International Nuclear Information System (INIS)

    Li Jingwei; Wu Jie

    2013-01-01

    Background: The traditional FPGA program is developed with HDL code, which will cost a lot of time and energy in writing and debugging the underlying code. Purpose: We want to use a new approach to develop FPGA program, which will greatly accelerate the FPGA development. And our system can also be compatible with NI (American National Instrument Company) CRIO case. Methods: We also choose FPGA as the core of hardware and use LabVIEW language (a graphical language) to develop FPGA program. Results: We realized a universal data interface platform by LabVIEW, which is different from the traditional FPGA development process using HDL. This system can provide many functions such as data processing, data IO and implementation of the PCI interface communication. Conclusions: FPGA program can also be developed by LabVIEW language, and it can achieve the corresponding data interface functions, and greatly reduce development time. (authors)

  17. Development of an Embedded Solar Tracking System with LabVIEW Motion Control

    International Nuclear Information System (INIS)

    Oh, Seung Jin; Hyun, Jun Ho; Oh, Won Jong; Kim, Yeong Min; Lee, Yoon Joon; Chun, Won Gee

    2010-01-01

    Motion control is a sub-field of automation, in which the position and/or velocity of machines are controlled using some type of device such as a hydraulic pump, linear actuator, or an electric motor. The motion control is widely used in the packaging, printing, textile, semiconductor production, and power plants. National Instruments LabVIEW is a graphical programming language that has its roots in automation control and data acquisition. Its graphical representation, similar to a process flow diagram, was created to provide an intuitive programming environment for scientist and engineers. Crystal River Nuclear Plant engineers developed automated testing system of nuclear plant control modules in an aging nuclear power plant using LabVIEW to improve performance and reliability and reduce cost. In this study, an embedded two-axis solar tracking system was developed using LabVIEW motion control module

  18. Linear Motor Motion Control Experiment System Design Based on LabVIEW

    Directory of Open Access Journals (Sweden)

    Cuixian He

    2018-01-01

    Full Text Available In order to meet the needs of experimental training of electrical information industry, a linear motor motion experiment system based on LabVIEW was developed. This system is based on the STM32F103ZET6 system processor controller, a state signal when the motor moves through the grating encoder feedback controller to form a closed loop, through the RS232 serial port communication with the host computer, the host computer is designed in the LabVIEW interactive environment monitoring software. Combined with the modular design concept proposed overall program, given the detailed hardware circuit, targeted for the software function design, to achieve man-machine interface. The system control of high accuracy, good stability, meet the training requirements for laboratory equipment, but also as a reference embodiment of the linear motor monitoring system.

  19. Holographic elements and curved slit used to enlarge field of view in rocket detection system

    Science.gov (United States)

    Breton, Mélanie; Fortin, Jean; Lessard, Roger A.; Châteauneuf, Marc

    2006-09-01

    Rocket detection over a wide field of view is an important issue in the protection of light armored vehicle. Traditionally, the detection occurs in UV band, but recent studies have shown the existence of significant emission peaks in the visible and near infrared at rocket launch time. The use of the visible region is interesting in order to reduce the weight and cost of systems. Current methods to detect those specific peaks involve use of interferometric filters. However, they fail to combine wide angle with wavelength selectivity. A linear array of volume holographic elements combined with a curved exit slit is proposed for the development of a wide field of view sensor for the detection of solid propellant motor launch flash. The sensor is envisaged to trigger an active protection system. On the basis of geometric theory, a system has been designed. It consists of a collector, a linear array of holographic elements, a curved slit and a detector. The collector is an off-axis parabolic mirror. Holographic elements are recorded subdividing a hologram film in regions, each individually exposed with a different incidence angle. All regions have a common diffraction angle. The incident angle determines the instantaneous field of view of the elements. The volume hologram performs the function of separating and focusing the diffracted beam on an image plane to achieve wavelength filtering. Conical diffraction property is used to enlarge the field of view in elevation. A curved slit was designed to correspond to oblique incidence of the holographic linear array. It is situated at the image plane and filters the diffracted spectrum toward the sensor. The field of view of the design was calculated to be 34 degrees. This was validated by a prototype tested during a field trial. Results are presented and analyzed. The system succeeded in detecting the rocket launch flash at desired fields of view.

  20. Major plant retrofits at Monticello nuclear generating plant

    International Nuclear Information System (INIS)

    Larsen, D.E.; Hogg, C.B.

    1986-01-01

    For the past several years, Northern States Power (NSP) has been making major plant retrofits to Monticello Nuclear generating Station in order to improve plant availability and upgrade the plant components for the potential extension of the operating license (life extension). This paper discusses in detail three major retrofits that have been completed or in the process of completion; recirculation loop piping replacement, reactor pressure vessel (RPV) water level-instrumentation modification, core spray piping replacement, the authors will address the scope of work, design and installation concerns, and life extension considerations during the design and procurement process for these three projects

  1. Retrofit and verification test of a 30-cm ion thruster

    Science.gov (United States)

    Dulgeroff, C. R.; Poeschel, R. L.

    1980-01-01

    Twenty modifications were found to be necessary and were approved by design review. These design modifications were incorporated in the thruster documents (drawings and procedures) to define the J series thruster. Sixteen of the design revisions were implemented in a 900 series thruster by retrofit modification. A standardized set of test procedures was formulated, and the retrofit J series thruster design was verified by test. Some difficulty was observed with the modification to the ion optics assembly, but the overall effect of the design modification satisfies the design objectives. The thruster was tested over a wide range of operating parameters to demonstrate its capabilities.

  2. Assessment of cockpit interface concepts for data link retrofit

    Science.gov (United States)

    Mccauley, Hugh W.; Miles, William L.; Dwyer, John P.; Erickson, Jeffery B.

    1992-01-01

    The problem is examined of retrofitting older generation aircraft with data link capability. The approach taken analyzes requirements for the cockpit interface, based on review of prior research and opinions obtained from subject matter experts. With this background, essential functions and constraints for a retrofit installation are defined. After an assessment of the technology available to meet the functions and constraints, candidate design concepts are developed. The most promising design concept is described in detail. Finally, needs for further research and development are identified.

  3. A digital frequency stabilization system of external cavity diode laser based on LabVIEW FPGA

    Science.gov (United States)

    Liu, Zhuohuan; Hu, Zhaohui; Qi, Lu; Wang, Tao

    2015-10-01

    Frequency stabilization for external cavity diode laser has played an important role in physics research. Many laser frequency locking solutions have been proposed by researchers. Traditionally, the locking process was accomplished by analog system, which has fast feedback control response speed. However, analog system is susceptible to the effects of environment. In order to improve the automation level and reliability of the frequency stabilization system, we take a grating-feedback external cavity diode laser as the laser source and set up a digital frequency stabilization system based on National Instrument's FPGA (NI FPGA). The system consists of a saturated absorption frequency stabilization of beam path, a differential photoelectric detector, a NI FPGA board and a host computer. Many functions, such as piezoelectric transducer (PZT) sweeping, atomic saturation absorption signal acquisition, signal peak identification, error signal obtaining and laser PZT voltage feedback controlling, are totally completed by LabVIEW FPGA program. Compared with the analog system, the system built by the logic gate circuits, performs stable and reliable. User interface programmed by LabVIEW is friendly. Besides, benefited from the characteristics of reconfiguration, the LabVIEW program is good at transplanting in other NI FPGA boards. Most of all, the system periodically checks the error signal. Once the abnormal error signal is detected, FPGA will restart frequency stabilization process without manual control. Through detecting the fluctuation of error signal of the atomic saturation absorption spectrum line in the frequency locking state, we can infer that the laser frequency stability can reach 1MHz.

  4. Viscous-Fluid-Spring Damper Retrofit of a Steel Moment Frame Structure

    International Nuclear Information System (INIS)

    Hussain, Saif; Van Benschoten, Paul; Al Satari, Mohamed; Lin, Silian

    2008-01-01

    The subject building is a peculiar pre-Northridge steel moment resisting frame building. Upon investigating the existing lateral resisting system, numerous significant deficiencies were identified; inherent lack of redundancy, poor geometry and inadequate stiffness of the lateral resisting system. All of which resulted in an extremely soft 5-story structure with a primary torsional mode of vibration at T 1 = 5.46 s. Significant structural modifications were deemed necessary to meet the ''life-safety'' performance objective as outlined in rehabilitation standards such as ASCE 41. Both increased stiffness and damping were required to adequately retrofit the building. Furthermore, adjacent building separation as well as deformation compatibility issues needed to be addressed and resolved. A three-dimensional computer model of the building was created using ETABS mathematically simulating the building's dynamic characteristics in its current condition. Multiple seismic retrofit systems were investigated such as Buckling Restrained Braced Frames (BRBF's). However, based on the performance effectiveness and constructability of the retrofit schemes studied, the Viscous-Fluid-Spring Damper (VFSD) system was proposed as the ''optimum'' solution for the building. The VFSD, was chosen because it combines the relatively compact size and minimally invasive constructability with the required properties (an elastomeric spring in parallel with a nonlinear velocity dependent viscous damper). A site-specific response spectrum was developed for the Design Basis Earthquake (DBE, 475 year return period) event, and three pairs of representative earthquake horizontal ground motion time-histories were scaled to match this DBE. The proposed scheme reduced the building maximum inter-story drift ratio from 5.4% to about 1%. Similarly, the maximum roof displacement was reduced by about 70% (23'' to 7'')

  5. Life cycle analysis of retrofitting with high energy efficiency air-conditioner and fluorescent lamp in existing buildings

    International Nuclear Information System (INIS)

    Techato, Kua-anan; Watts, Daniel J.; Chaiprapat, Sumate

    2009-01-01

    Life cycle analysis of mercury in discarded low energy efficiency fluorescent lamps (36 W) and of HCFC in air-conditioners (12,000 Btu) removed from service has been conducted in this study. The objective was to find out the environmental impact (EDIP 1997 category, waste evaluation) of the products that appear in the waste stream as a result of facility upgrades. The scope of the study starts from retrofitting of the lamps and air-conditioners through recycling and disposal. For a 36 W fluorescent lamp, the bulk waste 1.64E-5 kg, hazardous waste 1.11E-4 kg, radioactive waste 1.09E-9 kg, and slag-ash 6.02E-7 kg occurred at the end of life of the retrofitting cycle. For a 12,000 Btu air-conditioner, the bulk waste 0.58 kg, hazardous waste 0.11 kg, radioactive waste 0.0002 kg, and slag-ash 0.01 kg also occurred at the end of life of the retrofitting cycle. These small amounts become important when viewed at the country level. These quantities imply that the policy makers who deal with hazardous waste should be aware of this waste-generating characteristic before issuing any pertinent policy. Consideration of this characteristic and planning for appropriate waste management methods at the beginning stage will reduce any future problem of contamination by the hazardous waste

  6. Life cycle analysis of retrofitting with high energy efficiency air-conditioner and fluorescent lamp in existing buildings

    Energy Technology Data Exchange (ETDEWEB)

    Techato, Kua-anan [International Postgraduate Programs in Environmental Management (Hazardous Waste Management) and ERI (Energy Research Institute), Chulalongkorn University, Bangkok 10330 (Thailand); Watts, Daniel J. [Otto H. York Center for Environmental Engineering and Science, New Jersey Institute of Technology, Newark, NJ 07102 (United States); Chaiprapat, Sumate [Department of Civil Engineering, Faculty of Engineering, Prince of Songkla University, Hat Yai Campus, Hat Yai, Songkhla 90112 (Thailand); National Center of Excellence for Environmental and Hazardous Waste Management-Satellite Center at Prince of Songkla University (Thailand)

    2009-01-15

    Life cycle analysis of mercury in discarded low energy efficiency fluorescent lamps (36 W) and of HCFC in air-conditioners (12,000 Btu) removed from service has been conducted in this study. The objective was to find out the environmental impact (EDIP 1997 category, waste evaluation) of the products that appear in the waste stream as a result of facility upgrades. The scope of the study starts from retrofitting of the lamps and air-conditioners through recycling and disposal. For a 36 W fluorescent lamp, the bulk waste 1.64E-5 kg, hazardous waste 1.11E-4 kg, radioactive waste 1.09E-9 kg, and slag-ash 6.02E-7 kg occurred at the end of life of the retrofitting cycle. For a 12,000 Btu air-conditioner, the bulk waste 0.58 kg, hazardous waste 0.11 kg, radioactive waste 0.0002 kg, and slag-ash 0.01 kg also occurred at the end of life of the retrofitting cycle. These small amounts become important when viewed at the country level. These quantities imply that the policy makers who deal with hazardous waste should be aware of this waste-generating characteristic before issuing any pertinent policy. Consideration of this characteristic and planning for appropriate waste management methods at the beginning stage will reduce any future problem of contamination by the hazardous waste. (author)

  7. A Systems View of Mother-Infant Face-to-Face Communication

    Science.gov (United States)

    Beebe, Beatrice; Messinger, Daniel; Bahrick, Lorraine E.; Margolis, Amy; Buck, Karen A.; Chen, Henian

    2016-01-01

    Principles of a dynamic, dyadic systems view of mother-infant face-to-face communication, which considers self- and interactive processes in relation to one another, were tested. The process of interaction across time in a large low-risk community sample at infant age 4 months was examined. Split-screen videotape was coded on a 1-s time base for…

  8. Investigating Pre-Service Mathematics Teachers' Innovation Awareness and Views Regarding Intelligent Tutoring Systems

    Science.gov (United States)

    Erdemir, Mustafa; Ingeç, Sebnem Kandil

    2016-01-01

    The purpose of this study is to identify pre-service primary mathematics teachers' views regarding on Web-based Intelligent Tutoring Systems (WBITS) in relation to its usability and influence on teaching. A survey method was used. The study was conducted with 43 students attending the mathematics teaching program under the department of elementary…

  9. GUIDON-WATCH: A Graphic Interface for Viewing a Knowledge-Based System. Technical Report #14.

    Science.gov (United States)

    Richer, Mark H.; Clancey, William J.

    This paper describes GUIDON-WATCH, a graphic interface that uses multiple windows and a mouse to allow a student to browse a knowledge base and view reasoning processes during diagnostic problem solving. The GUIDON project at Stanford University is investigating how knowledge-based systems can provide the basis for teaching programs, and this…

  10. Student Entitlement Models in Australia's National Training System: Expert Views. Occasional Paper

    Science.gov (United States)

    Bowman, Kaye; McKenna, Suzy

    2016-01-01

    This occasional paper provides the views of 17 "thought leaders" in the Australian vocational education and training (VET) sector. Their insight and opinions were sought to inform a larger research project focused on the student entitlement reforms that were introduced into the national VET system from 2012. These individuals offered a…

  11. Placing Gender in the Heart of MFT Masters Programs: Teaching a Gender Sensitive Systemic View.

    Science.gov (United States)

    Storm, Cheryl L.

    1991-01-01

    Describes masters level course for marriage and family therapists that teaches systemic underpinnings of field while also addressing feminist critique of ideas. Notes goal of course is for students to understand and adopt gender sensitive view; students then have a yardstick as they study and evaluate marriage and family therapy theories, observe…

  12. A Top-Down Approach to Construct Execution Views of a Large Software-Intensive System

    NARCIS (Netherlands)

    Callo Arias, T.B.; America, P.H.M.; Avgeriou, P.

    2011-01-01

    This paper presents a top-down approach to construct execution views of a large and complex software intensive system. Execution viewsdescribe what the software does at runtime and how it does it. The presented approach represents a reverse architecting solution that follows a set of pre-defined

  13. Performance Modelling of Automatic Identification System with Extended Field of View

    DEFF Research Database (Denmark)

    Lauersen, Troels; Mortensen, Hans Peter; Pedersen, Nikolaj Bisgaard

    2010-01-01

    This paper deals with AIS (Automatic Identification System) behavior, to investigate the severity of packet collisions in an extended field of view (FOV). This is an important issue for satellite-based AIS, and the main goal is a feasibility study to find out to what extent an increased FOV...

  14. Potential of HVAC and solar technologies for hospital retrofit to reduce heating energy consumption

    Science.gov (United States)

    Pop, Octavian G.; Abrudan, Ancuta C.; Adace, Dan S.; Pocola, Adrian G.; Balan, Mugur C.

    2018-02-01

    The study presents a combination of several energy efficient technologies together with their potential to reduce the energy consumption and to increase the comfort through the retrofit of a hospital building. The existing situation is characterized by an old and inefficient heating system, by the complete missing of any ventilation and by no cooling. The retrofit proposal includes thermal insulation and a distributed HVAC system consisting of several units that includes air to air heat exchangers and air to air heat pumps. A condensing boiler was also considered for heating. A solar thermal system for preparing domestic hot water and a solar photovoltaic system to assist the HVAC units are also proposed. Heat transfer principles are used for modelling the thermal response of the building to the environmental parameters and thermodynamic principles are used for modelling the behaviour of HVAC, solar thermal system and photovoltaic system. All the components of the heating loads were determined for one year period. The study reveals the capacity of the proposed systems to provide ventilation and thermal comfort with a global reduction of energy consumption of 71.6 %.

  15. A laser metrology/viewing system for ITER in-vessel inspection

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Barry, R.E.; Chesser, J.B.; Herndon, J.N.; Menon, M.M.; Slotwinski, A.; Dagher, M.A.; Yuen, J.L.

    1998-01-01

    This paper identifies the requirements for the International Thermonuclear Experimental Reactor metrology and viewing system, and describes a remotely operated precision surface mapping system. A metrology system capable of achieving sub-millimeter accuracy must operate in a reactor vessel that has high gamma radiation, high vacuum, elevated temperature, and magnetic field. A coherent, frequency modulated laser radar system is under development to meet these requirements. The metrology/viewing sensor consists of a compact laser optics module linked through fiber optics to the laser source and imaging units, located outside the harsh environment. The deployment mechanism is a remotely operated telescopic-mast. Gamma irradiation to 10 7 Gy was conducted on critical sensor components at Oak Ridge National Laboratory, with no significant impact to data transmission, and analysis indicates that critical sensor components can operate in a magnetic field with certain design modifications. Plans for testing key components in a magnetic field are underway. (orig.)

  16. LabVIEW-based X-ray detection system for laser compton scattering experiment

    International Nuclear Information System (INIS)

    Luo Wen; Xu Wang; Pan Qiangyan

    2010-01-01

    A LabVIEW-based X-ray detection system has been developed for laser-Compton scattering (LCS) experiment at the 100 MeV Linac of the Shanghai Institute of Applied Physics (SINAP). It mainly consists of a Si (Li) detector, readout electronics and a LabVIEW-based Data Acquisition (DAQ), and possesses the functions of signal spectrum displaying, acquisition control and simple online data analysis and so on. The performance test shows that energy and time resolutions of the system are 184 eV at 5.9 keV and ≤ 1% respectively and system instability is found to be 0.3‰ within a week. As a result, this X-ray detection system has low-cost and high-performance features and can meet the requirements of LCS experiment. (authors)

  17. Neutron flux density data acquisition system based on LabVIEW

    International Nuclear Information System (INIS)

    Zhao Yanhui; Zhao Xiuliang; Li Zonglun; Liang Fengyan; Liu Liyan

    2011-01-01

    In the LabVIEW software, combined with PCI-6251 data acquisition card, VI of neutron flux density data acquisition is realized by DAQmx data acquisition functions. VI is composed of front panel and block diagram. The data collected can be displayed in the forms of the data curve and the data control, and saved in the form of files. Test results show that the frequency of output signal in NI ELVIS can be accurately measured by the system, realizing neutron flux density data acquisition based on LabVIEW. (authors)

  18. Macintosh/LabVIEW based control and data acquisition system for a single photon counting fluorometer

    Science.gov (United States)

    Stryjewski, Wieslaw J.

    1991-08-01

    A flexible software system has been developed for controlling fluorescence decay measurements using the virtual instrument approach offered by LabVIEW. The time-correlated single photon counting instrument operates under computer control in both manual and automatic mode. Implementation time was short and the equipment is now easier to use, reducing the training time required for new investigators. It is not difficult to customize the front panel or adapt the program to a different instrument. We found LabVIEW much more convenient to use for this application than traditional, textual computer languages.

  19. Evaluation of CNT Energy Savers Retrofit Packages Implemented in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Farley, Jenne [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States); Ruch, Russell [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States)

    2013-09-01

    This evaluation explored the feasibility of designing prescriptive retrofit measure packages for typical Chicago region multifamily buildings in order to achieve 25%-30% source energy savings through the study of three case studies. There is an urgent need to scale up energy efficiency retrofitting of Chicago's multifamily buildings in order to address rising energy costs and a rapidly depletingrental stock. Aimed at retrofit program administrators and building science professionals, this research project investigates the possibility of using prescriptive retrofit packages as a time- and resource-effective approach to the process of retrofitting multifamily buildings.

  20. Evaluation of CNT Energy Savers Retrofit Packages Implemented in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Farley, Jenne [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States); Ruch, Russell [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States)

    2013-09-01

    This evaluation explored the feasibility of designing prescriptive retrofit measure packages for typical Chicago region multifamily buildings in order to achieve 25%-30% source energy savings through the study of three case studies. There is an urgent need to scale up energy efficiency retrofitting of Chicago's multifamily buildings in order to address rising energy costs and a rapidly depleting rental stock. Aimed at retrofit program administrators and building science professionals, this research project investigates the possibility of using prescriptive retrofit packages as a time- and resource-effective approach to the process of retrofitting multifamily buildings.